Exhibit 12 - Planning and Development staff report

Corona City Council
March 1, 2023

Document
Exhibit 12 - Planning and Development staff report
Meeting
March 1, 2023
Body
Corona City Council
Pages
13
Original file
63.7 MB
Text extracted from the city's file for reading and search. Open the original on corona.legistar1.com. That file is the official record.

3.2.1 Environmental Setting
The City’s history and development is closely linked to agriculture although agricultural resources in the City have largely been replaced by residential subdivisions. Much of present-day Corona was used by the citrus industry, but over the past 50 years, the land required for agricultural production has gradually transitioned to master-planned developments. According to the City’s General Plan, there are no longer agricultural preserves under a Williamson Act contract within the City, and only smaller niche agricultural land uses remain (City of Corona 2020). The vast majority of productive farmland is located in southwest Corona, and the majority of grazing land is located east of the Interstate 15 in the City’s sphere of influence (SOI) (City of Corona 2019).

The City’s western border is shared by the Cleveland National Forest. The City’s hillside and canyons contain a mix of riparian forest, southern sycamore alter riparian woodland, and southern coast live oak riparian forest. Montane coniferous forest resources are also located in several locations in the City, including the westernmost SOI and Sierra del Oro area, Eagle Valley, the western interface with the Cleveland National Forest, and portions of El Cerrito. The Prado Basin also contains areas with forestland, riparian scrub, and woodland forest. Isolated woodlands that could fall under the definition of forest land per PRC Section 12220(g) are located in Temescal Canyon, the western boundary of the City, and west of □ □ □ ~
□ □ □ ~
□ □ □ ~
□ □ □ ~
□ □ □ ~
IJ
City of Corona General Plan Housing Element Rezoning Program Update Project Initial Study
Environmental Setting, Analysis, and Mitigation Measures 3-9
Coronita. Additionally, riparian scrub, woodland, and forest lands are predominately found in El Cerrito, Temescal Canyon, and the northern portion of the City, east of the Prado Basin (City of Corona 2019).

3.2.2 Environmental Impact Analysis
a) Would the project Convert Prime Farmland, Unique Farmland, or Farmland of Statewide Importance (Farmland), as shown on the maps prepared pursuant to the Farmland Mapping and Monitoring Program of the California Resources Agency, to non-agricultural use? Finding: No Impact
The Project is proposing a rezoning program to accommodate the planning of low- and moderate-income housing required under the Housing Element Update pursuant to the state’s RHNA allocation and incorporation of 594 additional housing units that were not analyzed in the Housing Element Update. The Project is proposing to rezone parcels within the City identified in the Housing Element Update to highdensity residential or an AHO zone in order to plan for sites suitable for low- and moderate-income units.

According to the California Department of Conservation (DOC)’s Farmland Mapping and Monitoring Program (FMMP), a majority of the City is designated as Urban and Built-Up Land. Parcels identified for rezoning or the AHO zone in the Housing Element Update are identified as Urban and Built-Up Land by the DOC and are not designated as Prime Farmland, Unique Farmland, or Farmland of Statewide Importance (DOC 2016). Therefore, development of the Project would not convert Prime Farmland, Unique Farmland, or Farmland of Statewide Importance to non-agricultural uses, and there would be no impact. As such, this topic does not require further evaluation in an EIR.
b) Would the project conflict with existing zoning for agricultural use, or a Williamson Act contract?
Finding: No Impact
According to the City’s General Plan Update EIR, there are no parcels of land within the City that are currently under a Williamson Act contract (City of Corona 2019). Therefore, the Project would not conflict with a Williamson Act contract, and there would be no impact.

Of the parcels of land identified in the Housing Element Update for rezoning or the AHO zone, one parcel is currently zoned for agricultural uses. A parcel located at 2550 S Main Street with APN 113-310-005 is zoned Agriculture (A) by the City’s zoning code. Though the site is zoned Agriculture, the site is designated as Medium Density Residential by the General Plan and is currently developed with a church complex, parking lot, and industrial land. The site does not include any current agricultural uses, and the surrounding lands are developed with residential and urban uses. The Project proposes to rezone the site to Low Density Multiple Family Residential (R2). With the rezone, the Project would not conflict with existing zoning for agricultural use. No other parcels of land identified for rezoning as part of Project implementation are zoned for agricultural purposes; therefore, the Project would not conflict with existing zoning for agricultural use, and there would be no impact. As such, this topic does not require further evaluation in an EIR.

IJ
City of Corona General Plan Housing Element Rezoning Program Update Project Initial Study
Environmental Setting, Analysis, and Mitigation Measures 3-10
c) Would the project conflict with existing zoning for, or cause rezoning of, forest land (as defined in Public Resources Code section 12220(g)), timberland (as defined by Public Resources Code section 4526), or timberland zoned Timberland Production (as defined by Government Code section 51104(g))?
Finding: No Impact
According to the City’s General Plan Update EIR and California Department of Forestry and Fire Protection (CAL FIRE), there are no current or planned commercial timber operations subject to a Timber Harvesting Plan in southwest Riverside County, and there are no timber production zones in the City or its SOI (City of Corona 2019). There are no lands within the City that are zoned as forest land, timberland, or zoned for timberland production. Therefore, the Project would not conflict with existing zoning for, or cause rezoning of, forest land, timberland, or timberland zoned Timberland Production, and there would be no impact. As such, this topic does not require further evaluation in an EIR. d) Would the project result in the loss of forest land or conversion of forest land to non-forest use? Finding: No Impact
As discussed above, portions of the City and SOI contain woodland and forest vegetation, predominately along the eastern and western borders of the City. The parcels proposed for rezoning or the AHO zone are located near the central portion of the City, and there are no forest lands located near the parcels proposed for rezoning. The parcels are located within an urban area, and there are no existing forestlands on these parcels. Therefore, development of the Project would not result in the loss of forest land or conversion of forest land to non-forest uses, and there would be no impact. As such, this topic does not require further evaluation in an EIR.
e) Would the project involve other changes in the existing environment which, due to their location or nature, could result in conversion of Farmland, to non-agricultural use or conversion of forest land to non-forest use?
Finding: No Impact
The parcels of land proposed for rezoning is located in an urbanized area surrounded by residential and commercial developments. The parcels are not currently used for agricultural or forest land uses. Due to the location of these parcels within the City, and being located in an existing urbanized area, the Project would not involve changes in the existing environment that could result in the conversion of farmland to non-agricultural uses or conversion of forest-land to non-forest uses. Therefore, there would be no impact.

As such, this topic does not require further evaluation in an EIR.

IJ
City of Corona General Plan Housing Element Rezoning Program Update Project Initial Study
Environmental Setting, Analysis, and Mitigation Measures 3-11

3.3 AIR QUALITY

AIR QUALITY
Would the Project:

Potentially
Significant
Impact
Less Than
Significant
with Mitigation
Incorporation
Less than
Significant
Impact
No
Impact
a) Conflict with or obstruct implementation of the
applicable air quality plan?
b) Result in a cumulatively considerable net increase of any criteria pollutant for which the Project region is
non-attainment under an applicable federal or state
ambient air quality standard?
c) Expose sensitive receptors to substantial pollutant
concentrations?
d) Result in other emissions (such as those leading to
odors) adversely affecting a substantial number of
people?

3.3.1 Environmental Setting
The City is within the South Coast Air Basin (SoCAB), which includes all of Orange County and the nondesert portions of Los Angeles, Riverside, and San Bernadino Counties. SoCAB is designated nonattainment for ozone (O3) and fine inhalable particulate matter (PM2.5) under the California and National Ambient Air Quality Standards (AAQS), nonattainment for lead (Los Angeles County only) under the National AAQS, and nonattainment for coarse inhalable particulate matter (PM10) under the California AAQS (City of Corona 2019).

The South Coast Air Quality Management District (SCAQMD) is responsible for preparing the air quality management plan (AQMP) for the SoCAB in coordination with SCAG to attain the National AAQS. In March 2017, SCAQMD adopted the 2016 AQMP which is composed of stationary and mobile-source emission reductions from regulatory control measures, incentive-based programs, co-benefits from climate programs, mobile-source strategies, and reductions from federal sources such as aircrafts, locomotives, and ocean-going vessels. Strategies outlined in the 2016 AQMP would be implemented in collaboration between California Air Resources Board (CARB) and the Environmental Protection Agency (EPA).

SCAQMD’s 2016 AQMP forecasts that the SoCAB will need to increase oxides of nitrogen (NOx) reductions by 45 percent additional reductions above existing regulations for the 2023 ozone standard and 55 percent additional reductions above existing regulations to meet the 2031 ozone standard.

3.3.2 Environmental Impact Analysis
a) Would the project conflict with or obstruct implementation of the applicable air quality plan? Finding: Potentially Significant Impact
As result of increased development and densification associated with Project implementation, emissions would be generated during both construction and operation of individual developments. Project IZI □ □ □
IZI □ □ □
IZI □ □ □
IZI □ □ □
IJ
City of Corona General Plan Housing Element Rezoning Program Update Project Initial Study
Environmental Setting, Analysis, and Mitigation Measures 3-12
implementation has the potential to cause significant environmental effects through conflict or obstruction of the applicable air quality plans. Therefore, these impacts will be analyzed further in the EIR. b) Would the project result in a cumulatively considerable net increase of any criteria pollutant for which the Project region is non-attainment under an applicable Federal or State ambient air quality standard?
Finding: Potentially Significant Impact
The proposed Project site is located in a non-attainment area for National Ambient Air Quality Standards (NAAQS) and California Ambient Air Quality Standards (CAAQS). As such, Project implementation has the potential to cause significant environmental effects through a potential cumulatively considerable net increase of particulate matter during construction. Therefore, this potentially significant impact will be further analyzed in the EIR.
c) Would the project expose sensitive receptors to substantial pollutant concentrations? Finding: Potentially Significant Impact
While it is unlikely that sensitive receptors could be exposed to substantial pollutant concentrations, due to construction or operation of the proposed Project, there is the potential to cause significant environmental effects if such exposure were to occur. Implementation of the proposed Project would include the development and operation of new and more intense land uses that could generate new sources of toxic air contaminants (TACs) in the City, from both stationary and mobile sources. As such, this potentially significant impact will be further analyzed in the EIR. d) Would the project result in other emissions (such as those leading to odors) adversely affecting a substantial number of people?
Finding: Potentially Significant Impact
Project implementation could cause the generation of new sources of odors or other emissions. Generally, residential land uses do not generate odors that could affect a substantial number of people, because they are not considered a typical odor-producing source, such as a waste treatment facility or an industrial operation. While it is unlikely that substantial numbers of people could be adversely affected by odors due to construction or operation of the proposed Project, there is the potential for the Project to result in other emissions. Therefore, these potentially significant impacts will be further analyzed in the EIR.

IJ
City of Corona General Plan Housing Element Rezoning Program Update Project Initial Study
Environmental Setting, Analysis, and Mitigation Measures 3-13

3.4 BIOLOGICAL RESOURCES

BIOLOGICAL RESOURCES
Would the project:

Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporation
Less than
Significant
Impact
No
Impact
a) Have a substantial adverse effect, either directly or through habitat modifications, on any species
identified as a candidate, sensitive, or special status species in local or regional plans, policies, or
regulations, or regulated by the California Department
of Fish and Wildlife or U.S. Fish and Wildlife Service? b) Have a substantial adverse effect on any riparian
habitat or other sensitive natural community identified in local or regional plans, policies, regulations or by the California Department of Fish and Wildlife or U.S.

Fish and Wildlife Service?
c) Have a substantial adverse effect on state or federally protected wetlands (including, but not limited to,
marsh, vernal pool, coastal, etc.) through direct
removal, filling, hydrological interruption, or other
means?
d) Interfere substantially with the movement of any
native resident or migratory fish or wildlife species or with established native resident or migratory wildlife
corridors, or impede the use of native wildlife nursery sites?
e) Conflict with any local policies or ordinances
protecting biological resources, such as a tree
preservation policy or ordinance?
f) Conflict with the provisions of an adopted Habitat
Conservation Plan, Natural Community Conservation
Plan, or other approved local, regional, or state
habitat conservation plan?

3.4.1 Environmental Setting
While highly urbanized, the City contains significant expanses of vegetation along its periphery and within its SOI areas. Open space areas surrounding the City supports a variety of plants and animals native to California and the combination of terrain, drainages and creeks, and other natural features provide opportunities for habitat and wildlife species.

The City is surrounded by expansive natural areas, such as the Cleveland National Forest, Chino Hills State Park, Prado Basin, Lake Matthews-Gavilan Plateau, and other areas, which may be crossed by a wide variety of wildlife species. These species move between patches of suitable habitat in undisturbed landscapes and environments fragmented by development. In the City, the few areas with natural characteristics that could be used by wildlife as movement or migratory corridors occur in orchards and along drainages. The most prominent features that may provide valuable habitat linkage are the Bedford □ ~ □ □
□ ~ □ □
□ ~ □ □
□ □ ~ □
□ □ □ ~
□ □ □ ~
IJ
City of Corona General Plan Housing Element Rezoning Program Update Project Initial Study
Environmental Setting, Analysis, and Mitigation Measures 3-14
Canyon Wash and Temescal Canyon Wash, which connect the Cleveland National Forest and the Lake Mathews Estelle Mountain Reserve. There are no other notable wildlife movement and migratory corridors in the City (City of Corona 2020).

The City and its SOI have many biological resources, although most have been found or could be present in undeveloped areas of the SOI and not necessarily within the City itself. These resources include: 12 sensitive natural communities, 5 designated critical habitats for threatened or endangered species, 64 special status plant species, 59 special status wildlife species, and several wildlife movement corridors.

In the City and its SOI, several animals and plants have been designated federal endangered, federal threatened, and/or state endangered species. These species also have designated critical habitat areas in the vicinity of the City and its SOI. These areas include the Prado Dam, the Santa Ana River emanating from the dam, and the southwest portion of the SOI abutting the Cleveland National Forest. According to the California Natural Diversity Database and the California Native Plant Society Rare Plant Inventory, 64 special status plant species may be present in the City or SOI. Of those species, 11 have been sighted in the City or its SOI (City of Corona 2020).

3.4.2 Environmental Impact Analysis
a) Would the project have a substantial adverse effect, either directly or through habitat modifications, on any species identified as a candidate, sensitive or special status species in local or regional plans, policies, or regulations, or regulated by the California Department of Fish and Wildlife or U.S. Fish and Wildlife Service?
Finding: Less than Significant with Mitigation Incorporation This Project sets the framework for future growth and development in the City by providing additional opportunities for development of low- and moderate-income housing, and therefore, it does not directly result in development. Certification of the Project itself would not lead to alteration or modification biological resources or habitats, and before any development or redevelopment activities could occur on identified parcels, they would be required to be analyzed for conformance with the requirements of CEQA. The Project’s identified parcels are located within a highly urbanized area and are not located in areas identified as designated critical habitat for wildlife species in the City. Biological resources in the City exist within several large areas of open space surrounding the City and the SOI and are not located directly within the City. According to the General Plan Update EIR, sensitive natural communities recorded within the City and SOI are located along the edges of the City and SOI (City of Corona 2019). Future residential development resulting from Project implementation is unlikely to result in adverse effects to special status species, as the identified parcels are either currently developed with existing uses or located in areas surrounded by development. Therefore, it is unlikely that these parcels would provide suitable habitats for wildlife species.

However, vacant parcels could contain wildlife species and habitats, and Project implementation could have an adverse effect on special status species.

Future residential development resulting from Project implementation would also be required to implement General Plan policies identified to reduce impacts to the City’s biological resources. In addition to General IJ
City of Corona General Plan Housing Element Rezoning Program Update Project Initial Study
Environmental Setting, Analysis, and Mitigation Measures 3-15
Plan policies, future residential development resulting from Project implementation would be required to comply with the Western Riverside Multi-Species Habitat Conservation Plan (MSHCP). Adherence to General Plan policies and the MSHCP would assist in reducing impacts to special status species.

Additionally, future residential development resulting from Project implementation would be required to implement General Plan Update EIR Mitigation Measures BIO-1 through BIO-4 which require future development projects to include a biological resources survey in compliance with the California Endangered Species Act (CESA) and Federal Endangered Species Act (FESA) and outline procedures for when sensitive biological resources are identified within or adjacent to the proposed development project area.

Future residential development resulting from Project implementation would also be required to implement General Plan Update EIR Mitigation Measure BIO-7, which requires pre-construction nesting bird surveys for new developments. The Migratory Bird Treaty Act is administered by the United States Fish and Wildlife Service and protects migratory birds, their eggs, parts and nests. Implementation of Mitigation Measure BIO-7 would minimize impacts to migratory birds that are protected under the Migratory Bird Treaty Act.

Implementation of Mitigation Measures BIO-1 through BIO-4 and BIO-7 would ensure that impacts to special status and protected species are avoided or minimized, and impacts would be less than significant.

As such, this topic does not require further evaluation in an EIR.

Mitigation Measure BIO-1: Applicants for future development projects shall include a biological resources survey. The biological resources survey shall be conducted by a qualified biologist. The biological resources survey shall include, but not be limited to:
• An analysis of available literature and biological databases, such as the California Natural Diversity Database, to determine sensitive biological resources that have been reported historically from the proposed development project vicinity.
• A review of current land use and land ownership within the proposed development project vicinity. • An assessment and mapping of vegetation communities present within the proposed development project vicinity.
• An evaluation of potential local and regional wildlife movement corridors. • A general assessment of potential jurisdictional areas, including wetlands and riparian habitats.

Habitat Assessment. If the proposed development project site supports vegetation communities that may provide habitat for plant or wildlife species, a focused habitat assessment shall be conducted by a qualified biologist to determine the potential for special status plant and/or animal species to occur within or adjacent to the proposed development project area. Adjoining properties should also be surveyed where direct or indirect project effects, such as those from fuel modification or herbicide application, could potentially extend off-site. If feasible, the habitat assessment should be conducted during non-drought years.

Vegetation communities should be classified and mapped to the alliance or association level using classification methods and membership rules according to A Manual of California Vegetation, 2nd edition (2009).

IJ
City of Corona General Plan Housing Element Rezoning Program Update Project Initial Study
Environmental Setting, Analysis, and Mitigation Measures 3-16
Focused Surveys. If one or more special status species has the potential to occur within the proposed development project area, focused species surveys shall be conducted to determine the presence/absence of these species to adequately evaluate potential direct and/or indirect impacts to these species. The focused survey shall record the location and boundary of special status species by use of global positioning system (GPS). The number of individuals in each special status plant population shall be provided as counted (if population is small) or estimated (if population is large). If applicable, information about the percentage of individuals in each life stage, such as seedlings vs. reproductive individuals, should be provided. If feasible, images of the target species and representative habitats should be included to support information and descriptions.

Preconstruction Surveys. If construction activities are not initiated immediately after focused surveys have been completed, additional preconstruction special status species surveys may be required to ensure impacts are avoided or minimized to the extent feasible. If preconstruction activities are required, a qualified biologist would perform these surveys as required for each special status species that is known to occur or has a potential to occur within or adjacent to the proposed development project area.

Biological Resources Report. The results of the biological survey for proposed development projects with no significant impacts may be presented in a biological survey letter report. For proposed development projects with significant impacts that require mitigation to reduce the impacts to below a level of significance, the results of the biological survey shall be presented in a biological technical report.

Mitigation Measure BIO-2: If sensitive biological resources are identified within or adjacent to the proposed development project area, the construction limits shall be clearly flagged to ensure impacts to sensitive biological resources are avoided or minimized to the extent feasible. Prior to implementing construction activities, a qualified biologist shall verify that the flagging clearly delineates the construction limits and sensitive resources to be avoided.

Mitigation Measure BIO-3: If sensitive biological resources are known to occur within or adjacent to the proposed development project area, a project-specific contractor training program shall be developed and implemented to educate project contractors on the sensitive biological resources within and adjacent to the proposed development project area and measures being implemented to avoid and/or minimize impacts to these species. A qualified biologist shall develop and implement the contractor training program.

Mitigation Measure BIO-4: If sensitive biological resources are present within or adjacent to the proposed development project area and impacts may occur from implementation of construction activities, a qualified biological monitor may be required during a portion or all of the construction activities to ensure impacts to the sensitive biological resources are avoided or minimized to the extent feasible. The specific biological monitoring requirements shall be evaluated on a project-by-project basis. The qualified biological monitor shall be approved by the City on a project-by-project basis based on applicable experience with the sensitive biological resources that may be impacted.

Mitigation Measure BIO-7: The City of Corona shall require applicants for future development projects to contract with a qualified biologist to conduct a preconstruction general nesting bird survey within all suitable nesting habitats that may be impacted by active construction during general avian breeding season IJ
City of Corona General Plan Housing Element Rezoning Program Update Project Initial Study
Environmental Setting, Analysis, and Mitigation Measures 3-17
(February 1 through August 31). The preconstruction surveys shall be conducted no more than 7 days prior to initiation of construction. If no active avian nests are identified within the proposed development project area or within a 300-foot buffer of the proposed development project area, no further mitigation is necessary. If active nests of avian species covered by the Fish and Game Code are detected within the proposed development project area or within a 300-foot buffer of the proposed development project area, construction shall be halted until the young have fledged, until a qualified biologist has determined the nest is inactive, or until appropriate mitigation measures that respond to the specific situation have been developed and implemented in consultation with the regulatory agencies. Based on the discretion of the qualified biologist, the 300-foot buffer may be expanded as appropriate to the species. b) Would the project have a substantial adverse effect on any riparian habitat or other sensitive natural community identified in local or regional plans, policies, and regulations or by the California Department of Fish and Wildlife or U.S. Fish and Wildlife Service? Finding: Less than Significant with Mitigation Incorporation Figure 5.4-5 of the General Plan Update EIR identifies areas within the City with riparian vegetation communities, including wetlands, rivers, streams, and other riverine habitats. These water resources may support biological resources, including riparian vegetation and associated wildlife species. As described above, implementation of General Plan policies would help protect and manage the City’s biological resources. According to Figure 5.4-5 of the General Plan Update EIR, future residential development resulting from Project implementation are not located in areas identified as being within riparian vegetation communities. However, the Project implementation could impact riparian habitats or other sensitive natural communities if it is located in the vicinity of these communities or if the identified parcels themselves include unidentified riparian habitat or sensitive natural community. Therefore, the Project would be required to implement General Plan Update EIR Mitigation Measures BIO-1 through BIO-4, identified above.

Implementation of Mitigation Measures BIO-1 through BIO-4 would ensure that the identified parcels go through a biological resources survey prior to development to assess the parcels for potential riparian habitat or other sensitive natural communities and would mitigate any potential impacts if sensitive biological resources are discovered. Therefore, with implementation of General Plan policies and Mitigation Measures BIO-1 through BIO-4 identified in the General Plan Update EIR, future residential development resulting from Project implementation would not have substantial adverse effects on riparian habitats or other sensitive natural communities, and impacts would be less than significant. As such, this topic does not require further evaluation in an EIR.
c) Would the project have a substantial adverse effect on state or federally protected wetlands (including, but not limited to, marsh, vernal pool, coastal, etc.) through direct removal, filling, hydrological interruption, or other means?
Finding: Less than Significant with Mitigation Incorporation According to the General Plan Update EIR, the City has a number of potential wetlands that may be regulated by the United States Army Corps of Engineers (USACE), California Department of Fish and Wildlife (CDFW), and/or Santa Ana Regional Water Quality Control Board (RWQCB) pursuant to several IJ
City of Corona General Plan Housing Element Rezoning Program Update Project Initial Study
Environmental Setting, Analysis, and Mitigation Measures 3-18
federal and state regulations, which include freshwater lakes/ponds, creeks, washed, aquifers, and other blue line streams. Figure 5.4-5 in the General Plan Update EIR identified areas of known wetlands within the City. The parcels proposed for rezoning under the Project are not located in areas identified as having wetlands; however, there is still a potential for wetlands to occur onsite or for the Project to be located within the vicinity of wetlands. Therefore, the Project may result in impacts to state or federally protected wetlands.

Future residential development resulting from Project implementation would be required to implement General Plan policies to minimize potential impacts to wetlands. Additionally, future residential development resulting from Project implementation would be required to implement General Plan Update EIR Mitigation Measure BIO-5 which would require preparation of jurisdictional delineations mapping waters, wetlands, and riparian habitats jurisdictional to the USACE, CDFW, and RWQCB and specifying impacts to such resources. Mitigation Measure BIO-5 would also require project applicants to obtain permits and authorizations from the USACE, CDFW, and RWQCB specifying measures to avoid, minimize, and mitigate impacts. With implementation of General Plan policies and Mitigation Measure BIO-5 identified in the General Plan Update EIR, future residential development resulting from Project implementation would not have substantial adverse effects on state or federally protected wetlands, and impacts would be less than significant. As such, this topic does not require further evaluation in an EIR.

Mitigation Measure BIO-5: The City of Corona shall require applicants of development project that have the potential to affect jurisdictional resources to contract with a qualified biologist to conduct a jurisdictional delineation following the methods outlined in the 1987 USACE Wetland Delineation Manual and the Regional Supplement to the USACE Wetland Delineation Manual: Arid West Region (USACE 2008) to map the extent of wetlands and non-wetland waters, determine jurisdiction, and assess potential impacts. The results of the delineation shall be presented in a wetland delineation report and shall be incorporated into the CEQA document(s) required for approval and permitting of the proposed development project.

Applicants of development projects that have the potential to impact jurisdictional features, as identified in the wetland delineation letter report, shall obtain permits and authorizations from the Army Corps of Engineers, California Department of Fish and Wildlife, and/or Santa Ana Regional Water Quality Control Board. The regulatory agency authorization(s) would include impact avoidance and minimization measures as well as mitigation measures for unavoidable impacts. Specific avoidance, minimization, and mitigation measures for impacts to jurisdictional resources shall be determined through discussions with the regulatory agencies during the proposed development project permitting process and may include monetary contributions to a mitigation bank or habitat creation, restoration, or enhancement. d) Would the project interfere substantially with the movement of any native resident or migratory fish or wildlife species or with established native resident or migratory wildlife corridors, or impede the use of native wildlife nursery sites?
Finding: Less than Significant Impact
Parcels identified for rezoning as part of the Project are located within the central portion of the City and are located within a highly urbanized area. Figure 5.4-7 in the City’s General Plan Update EIR identified areas of potential wildlife movement corridors. Areas where the identified parcels for the Project are located are not located within areas identified as potential wildlife movement corridors. Parcels identified for future IJ
City of Corona General Plan Housing Element Rezoning Program Update Project Initial Study
Environmental Setting, Analysis, and Mitigation Measures 3-19
residential development resulting from Project implementation are either currently developed with existing uses or are located within highly urbanized areas with existing development surrounding the sites.

Therefore, the potential for identified parcels to be used by wildlife species as movement corridors or nursery sites are highly unlikely. Additionally, future residential development resulting from Project implementation would be required to implement General Plan policies identified to reduce impacts to wildlife movement. Therefore, future residential development resulting from Project implementation would not interfere substantially with the movement of wildlife species or impede the use of native wildlife nursery sites, and impacts would be less than significant. As such, this topic does not require further evaluation in an EIR.
e) Would the project conflict with any local policies or ordinances protecting biological resources, such as a tree preservation policy or ordinance?
Finding: No Impact
Chapter 12.22. Community Forestry Program, of the City’s Municipal Code recognizes, designates, and protects landmark trees. Pursuant to the municipal code, the City Council can designate a tree as a “landmark tree” on City property if it meets certain criteria adopted by resolution of the council. The Municipal Code restricts permanent removal of landmark trees except in emergency situations. Future residential development resulting from Project implementation would be required to abide by this regulation and ensure the Project does not lead to removal of designated landmark trees. Therefore, future residential development resulting from Project implementation would not conflict with local policies and ordinances protecting biological resources, and there would be no impact. As such, this topic does not require further evaluation in an EIR.
f) Would the project conflict with the provisions of an adopted Habitat Conservation Plan, Natural Community Conservation Plan, or other approved local, regional, or state habitat conservation plan?
Finding: No Impact
The City is a participant in the Western Riverside County MSHCP which is a comprehensive, multijurisdictional plan that addresses biological and ecological diversity by conserving species and associated habitats while allowing approval of development in western Riverside County (City of Corona 2019). If one of the Project’s identified parcels is located in “criteria area” of the MSHCP, the Project would be required to obtain approval from the Regional Conservation Authority and a permit from the local responsible agency and, if approved, would be required to pay fees for review and construction in accordance with Municipal Code Chapter 16.33, Multiple Species Habitat Conservation Plan Mitigation Fee (City of Corona 2019). The Project’s identified parcels are not located within the MSHCP’s “criteria area,” and therefore, the Project would not conflict with the MSHCP.

The City has prepared a long-term habitat conservation plan (HCP) for Stephen’s kangaroo rat that is administered by the Riverside County Habitat Conservation Agency. Projects located in the eastern and southern portions of the City and its SOI would be required to comply with the HCP for the Stephen’s IJ
City of Corona General Plan Housing Element Rezoning Program Update Project Initial Study
Environmental Setting, Analysis, and Mitigation Measures 3-20
kangaroo rat. The Project is not located in areas designated as a Stephen’s Kangaroo Rat Fee Area, as demonstrated by Figure 5.4-1 in the General Plan Update EIR. Therefore, the Project would not conflict with the Stephen’s Kangaroo Rat HCP.

Although the City is under the jurisdiction of the Western Riverside County MSHCP and the Stephen’s Kangaroo Rat HCP, the identified Project parcels are not located within areas identified as “criteria area” by the MSHCP or Stephen’s Kangaroo Rat boundaries in the HCP. Therefore, future residential development resulting from Project implementation would not conflict with provisions of an adopted HCP, Natural Community Conservation Plan, or other approved local, regional, or state habitat conservation plan, and there would be no impact. As such, this topic does not require further evaluation in an EIR.

IJ
City of Corona General Plan Housing Element Rezoning Program Update Project Initial Study
Environmental Setting, Analysis, and Mitigation Measures 3-21

3.5 CULTURAL RESOURCES
CULTURAL and TRIBAL RESOURCES
Would the project:

Potentially
Significant
Impact
Less Than
Significant
with Mitigation
Incorporation
Less than
Significant
Impact
No
Impact
a) Cause a substantial adverse change in the significance of a historical resource pursuant to Section 15064.5?
b) Cause a substantial adverse change in the significance of an archaeological resource pursuant to Section 15064.5? c) Disturb any human remains, including those interred
outside of formal cemeteries?

3.5.1 Environmental Setting
The City is located within an ethnographic transition zone between three Native American groups: the Juaneño, the Gabrielino, and the Cahuilla. It is said that these Native American groups occupied the Corona area in the early 1700s, prior to the arrival of the Spanish. During the early 1800s, lands within the City were part of several Mexican land grants, and with the Treaty of Guadalupe Hidalgo, in 1848, Mexico ceded the area to the United States with the rest of California (City of Corona 2020).

Archaeological resources refer to any material remains of human life or activities that are at least 50 years of age and that can provide scientific or humanistic understanding of past human behavior, cultural adaptation, and related topics. The City and its SOI are sensitive for existing archaeological resources, and cultural records search show 70 recorded resources within the City, of which 30 are prehistoric archaeological sites, 38 are historic archaeological sites, and two are multicomponent resources (City of Corona 2020).

Architectural and historic resources typically refer to resources that date back a century or more. The City has a documented variety of historic resources. The Corona Register of Historic Resources and the Corona Heritage Inventory comprise 482 buildings, structures, and sites of local significance, civic identity, and character. Additionally, there are several sites within the City that are listed or are eligible for listing for the California Register of Historic Resources (CRHR) or National Register of Historic Places (NRHP) (City of Corona 2020). The City has established ten historic districts within the City.

3.5.2 Environmental Impact Analysis
a) Would the project cause a substantial adverse change in the significance of a historical resource as identified in Section 15064.5?
Finding: Less than Significant with Mitigation Incorporation According to the General Plan Update EIR, there are 31 previously recorded built environment resources identified within the City, as well as seven historic properties defined as listed or eligible for listing on the NRHP. Within the City, there are no State Historic Landmarks, but there are two State Historical Points of □ ~ □ □
□ ~ □ □
□ □ ~ □
IJ
City of Corona General Plan Housing Element Rezoning Program Update Project Initial Study
Environmental Setting, Analysis, and Mitigation Measures 3-22
Interest. The five properties listed on the NRHP are automatically eligible for listing to the CRHR; additionally, there are eight other properties that are eligible for CRHR. The Corona Register of Historic Resources contains 367 individual built-environment resources. Additionally, there are 57 identified properties that are listed on the Corona Historic Landmarks, and 10 identified Historic Markers (City of Corona 2019).

Development of the Project could adversely impact some of these historic resources if they are located on or near an identified resource. Known or future historic sites or resources listed in the national, California, or local registers maintained by the City would be protected through local ordinances, General Plan policies, and state and federal regulations restricting alteration, relocation, and demolition of historical resources.

Compliance with the proposed General Plan policies and state and federal regulations would ensure that development would not result in adverse impacts to identified historic resources (City of Corona 2019).

This Project sets the framework for future growth and development in the City by providing additional opportunities for development of low- and moderate-income housing, and therefore, it does not directly result in development. Certification of the Project itself would not lead to demolition or alteration of any historic resources. Furthermore, the Project would be required to implement Mitigation Measures CUL-1 through CUL-4 identified in the City’s General Plan Update EIR. Mitigation Measures CUL-1 through CUL4 would reduce potential impacts to historic and cultural resources and include requirements for historic resources assessments to be conducted on an individual project level, setting standards and regulations for future developments that may impact historical and cultural resources. Therefore, compliance with existing laws and regulations and implementation of General Plan policies and mitigation measures identified in the General Plan Update EIR, future residential development resulting from Project implementation would not result in a substantial adverse change in the significance of a historical resource, and impacts would be less than significant. As such, this topic does not require further evaluation in an EIR.

Mitigation Measure CUL-1: Prior to any construction activities that may affect historical resources (i.e., structures 45 years or older), a historical resources assessment shall be performed by an architectural historian or historian who meets the Secretary of the Interior’s Professionally Qualified Standards (PQS) in architectural history or history. This shall include a records search to determine if any resources that may be potentially affected by the project have been previously recorded, evaluated, and/or designated in the National Register of Historic Places (NRHP), California Register of Historic Resources (CRHR), or Corona Register of Historic Resources. Following the records search, the qualified architectural historian or historian shall conduct a reconnaissance-level and/or intensive-level survey in accordance with the California Office of Historic Preservation (OHP) guidelines to identify any previously unrecorded potential historical resources that may be potentially affected by the proposed project. Pursuant to the definition of a historical resource under CEQA, potential historical resources shall be evaluated under a developed historic context.

Mitigation Measure CUL-2: To ensure that projects requiring the relocation, rehabilitation, or alteration of a historical resource not impair its significance, the Secretary of the Interior’s Standards for the Treatments of Historic Properties shall be used to the maximum extent possible. The application of the standards shall be overseen by a qualified architectural historian or historic architect meeting the PQS. Prior to any IJ
City of Corona General Plan Housing Element Rezoning Program Update Project Initial Study
Environmental Setting, Analysis, and Mitigation Measures 3-23
construction activities that may affect the historical resource, a report identifying and specifying the treatment of character-defining features and construction activities shall be provided to the City of Corona.

Mitigation Measure CUL-3: If a proposed project would result in the demolition or significant alteration of a historical resource, it cannot be mitigated to a less than significant level. However, recordation of the resource prior to construction activities will assist in reducing adverse impacts to the resource to the greatest extent possible. Recordation shall take the form of Historic American Buildings Survey (HABS), Historic American Engineering Record (HAER), or Historic American Landscape Survey (HALS) documentation, and shall be performed by an architectural historian or historian who meets the PQS. Documentation shall include an architectural and historical narrative; medium- or large-format black and white photographs, negatives, and prints; and supplementary information such as building plans and elevations, and/or historic photographs. Documentation shall be reproduced on archival paper and placed in appropriate local, state, or federal institutions. The specific scope and details of documentation would be developed at the project level.

Mitigation Measure CUL-4: If cultural resources that are eligible for listing to the NRHP, CRHR, or Corona Register of Historic Resources are identified within or adjacent to the proposed development, the construction limits shall be clearly flagged to assure impacts to eligible cultural resources are avoided or minimized to the extent feasible. Prior to implementing construction activities, a qualified archaeologist shall verify that the flagging clearly delineates the construction limits and eligible resources to be avoided. Since the location of some eligible cultural resources is confidential, these resources will be flagged as environmentally sensitive areas.
b) Would the project cause a substantial adverse change in the significance of an archaeological resource pursuant to Section 15064.5?
Finding: Less than Significant with Mitigation Incorporation As discussed above, approval of the proposed Project by itself would not directly affect archaeological resources as the Project sets the framework for future growth and development in the City by providing additional opportunities for development of low- and moderate-income housing and, therefore, does not directly result in development. However, Project implementation could indirectly affect archaeological resources, as it would allow for future development of the sites. Grading and construction activities of parcels identified for the Project could require earth moving activities that could potentially unearth previously unrecorded resources.

According to the General Plan Update EIR, there are 70 cultural resources within the City, which include 30 prehistoric archaeological sites, 38 historic archaeological sites, 2 multicomponent resources, and 6 resources located on the border between the City and its SOI. There are multiple known fossil localities within the City, as well as within the vicinity (City of Corona 2019).

Archaeological sites are protected by a wide variety of state policies and regulations under the California Public Resources Code, and cultural resources receive protection under both the California Public Resources Code and CEQA. Long term implementation of the Project could allow development including IJ
City of Corona General Plan Housing Element Rezoning Program Update Project Initial Study
Environmental Setting, Analysis, and Mitigation Measures 3-24
construction activities and grading in areas with undiscovered archaeological resources. Therefore, the Project could result in potential unearthing of previously unknown and unrecorded archaeological resources and result in significant impacts. The Project would be required to implement General Plan policies related to reducing impacts of potential development on cultural resources and would be required to comply with existing laws and regulations pertaining to archaeological and cultural resources. Additionally, the Project would implement Mitigation Measure CUL-5, identified in the General Plan Update EIR. Mitigation Measure CUL-5 requires that an archaeological resources assessment be conducted for future development projects and outlines procedures to be followed depending on the results of the archaeological resources assessment. With the implementation of Mitigation Measure CUL-5 and relevant General Plan policies and compliance with existing laws and regulations, impacts to archaeological resources would be less than significant. As such, this topic does not require further evaluation in an EIR.

Mitigation Measure CUL-5: To determine the archaeological sensitivity for discretionary projects within the City, an archaeological resources assessment shall be performed under the supervision of an archaeologist that meets the Secretary of the Interior’s Professionally Qualified Standards (PQS) in either prehistoric or historic archaeology. The assessments shall include a California Historical Resources Information System (CHRIS) records search and a search of the Sacred Lands File (SLF) maintained by the Native American Heritage Commission (NAHC). The records searches shall determine if the proposed project has been previously surveyed for archaeological resources, identify and characterize the results of previous cultural resource surveys, and disclose any cultural resources that have been recorded and/or evaluated. A Phase I pedestrian survey shall be undertaken in areas that are undeveloped to locate any surface cultural materials.
a. If potentially significant archaeological resources are identified through an archaeological resources assessment, and impacts to these resources cannot be avoided, a Phase II Testing and Evaluation investigation shall be performed by an archaeologist who meets the PQS prior to any construction-related ground-disturbing activities to determine significance. If resources determined significant or unique through Phase II testing, and site avoidance is not possible, appropriate sitespecific mitigation measures shall be established and undertaken. These might include a Phase III data recovery program that would be implemented by a qualified archaeologist and shall be performed in accordance with the Office of Historic Preservation’s Archaeological Resource Management Reports (ARMR): Recommended Contents and Format (1990) and Guidelines for Archaeological Research Designs (1991).
b. If the archaeological assessment did not identify potentially significant archaeological resources within the proposed General Plan area but indicated the area to be highly sensitive for archaeological resources, a qualified archaeologist shall monitor all ground disturbing construction and pre-construction activities in areas with previously undisturbed soil. The archaeologist shall inform all construction personnel prior to construction activities of the proper procedures in the event of an archaeological discovery. The training shall be held in conjunction with the project’s initial on-site safety meeting, and shall explain the importance and legal basis for the protection of significant archaeological resources. In the event that archaeological resources (artifacts or features) are exposed during ground-disturbing activities, construction activities in the immediate IJ
City of Corona General Plan Housing Element Rezoning Program Update Project Initial Study
Environmental Setting, Analysis, and Mitigation Measures 3-25
vicinity of the discovery shall be halted while the resources are evaluated for significance by an archaeologist who meets the PQS. If the discovery proves to be significant, it shall be curated with a recognized scientific or educational repository.
c. If the archaeological assessment did not identify potentially significant archaeological resources, but indicates the area to be of medium sensitivity for archaeological resources, an archaeologist who meets the PQS shall be retained on an on-call basis. The archaeologist shall inform all construction personnel prior to construction activities about the proper procedures in the event of an archaeological discovery. The training shall be held in conjunction with the project’s initial onsite safety meeting, and shall explain the importance and legal basis for the protection of significant archaeological resources. In the event that archaeological resources (artifacts or features) are exposed during ground disturbing activities, construction activities in the immediate vicinity of the discovery shall be halted while the on-call archaeologist is contacted. If the discovery proves to be significant, it shall be curated with a recognized scientific or educational repository. c) Would the project disturb any human remains, including those interred outside of formal cemeteries?
Finding: Less than Significant Impact
Project construction activities could result in unknown human remains being unearthed during earth moving activities. The General Plan Update EIR identified that General Plan policy HR-3.8 would minimize potential impacts. General Plan policy HR-3.8 identifies the required procedures in the event of the discovery or a burial, human bone, or suspected human bones during construction activities. California Health and Safety Code, Section 7050.5; CEQA Section 15064.5; and PRC Section 5097.98, mandate the process to be followed in the event of an accidental discovery of any human remains in a location other than a dedicated cemetery. California Health and Safety Code, Section 7050.5, requires that if human remains are discovered on a project site, disturbance of the site shall remain halted until the coroner has conducted an investigation into the circumstances, manner, and cause of any death, and the recommendations concerning the treatment and disposition of the human remains have been made to the person responsible for the excavation, or to his or her authorized representative, in the manner provided in Section 5097.98 of the PRC. If the coroner determines that the remains are not subject to his or her authority and if the coroner recognizes or has reason to believe the human remains to be those of a Native American, he or she shall contact, by telephone within 24 hours, the Native American Heritage Commission (City of Corona 2019).

Although construction activities associated with development of the Project could result in the discovery of human remains, compliance with existing law would ensure that significant impacts to human remains would not occur. Therefore, implementation of relevant General Plan policy and compliance with existing laws and regulations would ensure that future residential development resulting from Project implementation does not disturb any human remains, and impacts would be less than significant. As such, this topic does not require further evaluation in an EIR.

IJ
City of Corona General Plan Housing Element Rezoning Program Update Project Initial Study
Environmental Setting, Analysis, and Mitigation Measures 3-26

3.6 ENERGY RESOURCES

ENERGY RESOURCES
Would the project:

Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporation
Less than
Significant
Impact
No
Impact
a) Result in potentially significant environmental impact due to wasteful, inefficient, or unnecessary
consumption of energy resources, during project
construction or operation?
b) Conflict with or obstruct a state or local plan for
renewable energy or energy efficiency?

3.6.1 Environmental Setting
Southern California Edison (SCE) is the provider of electrical services to most of the City and its SOI. Total electricity consumption in SCE’s service area, which spans much of southern California from Orange and Riverside Counties on the south to Santa Barbara County on the west to Mono County to the north, in gigawatt-hours (GWh) was 102,521 GWh in 2018 (City of Corona 2019). Sources of electricity sold by Southern California Edison (SCE) in 2017 were:
• 32 percent renewable, consisting mostly of solar and wind • 8 percent large hydroelectric
• 20 percent natural gas
• 6 percent nuclear
• 34 percent unspecified sources
On April 4, 2001, the City Council passed Resolution No. 2001-25, which established a municipally owned electric utility. In August 2001, this electric utility, which is part of the Corona Department of Water and Power (DWP) [Corona DWP has since been renamed Corona Utilities Department], entered into an agreement with SCE to provide retail services as an electric services provider. Corona Utilities buys and sells power on behalf of the City’s municipal electric accounts and properties within specific service areas.

In 2018, the estimated existing electricity demand for residential developments in the City was 371,670,609 kWh (kilowatt-hours) per year, with the City and SOI having a total demand of 1,412,642,823 kWh per year (City of Corona 2019).

Southern California Gas Company (SoCalGas) provides natural gas services to the City and maintains transmission and distribution lines through the City and SOI. The service area of SoCalGas spans much of the southern half of California, from Imperial County in the southeast, to San Luis Obispo County in the northwest, to part of Fresno County in the north, and to Riverside County and most of San Bernardino County in the east. According to the General Plan Update EIR, existing natural gas demands in the City for residential developments is 19.4 million therms per year, and total natural gas demand for the City and its SOI was estimated at 43.9 million therms per year (City of Corona 2019). ~ □ □ □
□ □ ~ □
IJ
City of Corona General Plan Housing Element Rezoning Program Update Project Initial Study
Environmental Setting, Analysis, and Mitigation Measures 3-27

3.6.2 Environmental Impact Analysis
a) Would the project result in potentially significant environmental impact due to wasteful, inefficient, or unnecessary consumption of energy resources, during Project construction or operation?
Finding: Potentially Significant Impact
Construction and operation of the proposed Project would result in an increased intensity of uses and more residential units than were originally envisioned under the General Plan and Housing Element. These additional uses would consume more energy which could result in a potentially significant environmental impact. Therefore, this potentially significant impact will be further analyzed in the EIR. b) Would the project conflict with or obstruct a state or local plan for renewable energy or energy efficiency?
Finding: Less than Significant Impact
According to the General Plan Update EIR, the state’s electricity grid is transitioning to renewable energy under the California Renewables Portfolio Standards (RPS) Program. In general, the state has RPDS requirements of 33 percent renewable energy by 2020, 40 percent by 2024, 50 percent by 2026, 60 percent by 2030, and 100 percent by 2045 (City of Corona 2019). The statewide RPS requirements do not directly apply to individual development projects, but to utilities and energy providers such as SCE and Corona Utilities. The Project is intended to be consistent with the implementing General Plan, and individual development projects constructed as a result of Project implementation would be required to comply with the current and future iterations the Building Energy Efficiency Standards and the California Green Building Standards Code (CALGreen). Additionally, future residential development resulting from Project implementation would be required to implement General Plan policies which support the statewide goal of transitioning the electricity grid to renewable sources. Therefore, with the implementation of General Plan policies and compliance with existing standards and regulations related to renewable energy, future residential development resulting from Project implementation would not conflict with or obstruct a state or local plan for renewable energy or energy efficiency, and impacts would be less than significant. As such, this topic does not require further evaluation in an EIR.

IJ
City of Corona General Plan Housing Element Rezoning Program Update Project Initial Study
Environmental Setting, Analysis, and Mitigation Measures 3-28

3.7 GEOLOGY AND SOILS

GEOLOGY AND SOILS
Would the project:

Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporation
Less than
Significant
Impact
No
Impact
a) Directly or indirectly cause substantial adverse effects, including the risk of loss, injury, or death involving:
i. Rupture of a known earthquake fault, as
delineated on the most recent Alquist-Priolo
Earthquake Fault Zoning Map issued by the
State Geologist for the area or based on other
substantial evidence of a known fault? Refer
to Division of Mines and Geology Special
Publication 42.
ii. Strong seismic ground shaking?
iii. Seismic-related ground failure, including
liquefaction?
iv. Landslides?
b) Result in substantial soil erosion or the loss of topsoil? c) Be located on strata or soil that is unstable, or that would become unstable as a result of the project, and
potentially result in on- or off-site landslide, lateral spreading, subsidence, liquefaction, or collapse?
d) Be located on expansive soil, as defined in
Table 18-1-B of the Uniform Building Code (1994),
creating substantial direct or indirect risks to life or property?
e) Have soils incapable of adequately supporting the use of septic tanks or alternative wastewater disposal
systems where sewers are not available for the disposal of wastewater?
f) Directly or indirectly destroy a unique paleontological resource or site or unique geological feature?

3.7.1 Environmental Setting
The City is situated in the Peninsular Ranges Geomorphic Province which encompasses an area that extends approximately 900 miles from the Transverse Ranges and the Los Angeles Basin, south to the southern tip of Baja California (City of Corona 2019). The province consists of a northwest-southeast oriented complex of blocks separated by similarly trending faults. Project parcels are located in areas with a basement bedrock complex consisting of Holocene to Late Pleistocene age younger sediments and Pleistocene older sediments, as identified in Figure 5.7-1 of the General Plan Update EIR.

Major active faults zones are located within the City and its surrounding areas. Mapped Alquist-Priolo Fault Zones within the City are associated with the Chino Fault and Glen Ivy segment of the Elsinore Fault and □ □ ~ □
□ □ ~ □
□ □ ~ □
□ □ ~ □
□ □ ~ □
□ □ ~ □
□ □ ~ □
□ □ □ ~
□ ~ □ □
IJ
City of Corona General Plan Housing Element Rezoning Program Update Project Initial Study
Environmental Setting, Analysis, and Mitigation Measures 3-29
active and potentially active faults are located close to the City. The Peninsular Ranges Province is traversed by a group of subparallel fault zones trending northwest. Major fault systems include the active San Andreas, San Jacinto, Whittier-Elsinore, and Newport-Inglewood Fault Zones which form a regional tectonic framework consisting of primarily of right-lateral, strike-slip movement. The City is located between two major, active fault zones; the Whittier-Elsinore Fault Zone located to the southwest and the San Jacinto Fault located to the northeast.

3.7.2 Environmental Impact Analysis
a) Would the project directly or indirectly cause potential substantial adverse effects, including the risk of loss, injury, or death involving:
i. Rupture of a known earthquake fault, as delineated on the most recent Alquist-Priolo Earthquake Fault Zoning Map issued by the State Geologist for the area or based on other substantial evidence of a known fault? Refer to Division of Mines and Geology Special Publication 42
ii. Strong seismic ground shaking?
iii. Seismic-related ground failure, including liquefaction? iv. Landslides?
Finding: Less than Significant Impact
Fault Rupture
According to the California Geologic Survey (CGS) California Earthquake Hazards Zone Map, much of the western portion of the City extending southeast through the Project area and the General Plan SOI is located within a fault zone (CGS 2021). Though none of the parcels identified for rezoning and AHO zoning are located within an identified fault zone, due to the proximity to the fault zone, there are significant risks for the Project to be impacted by rupture of a known earthquake fault. The General Plan Update EIR identified that mandatory compliance with existing regulations, including preparation and submittal of seismicity reports prior to approval of grading plans, would ensure that surface fault rupture impacts to any new development within the City would be reduced to a less than significant level (City of Corona 2019).

Therefore, with compliance with existing regulations and preparation of seismicity reports, Project implementation would have a less than significant impact related to rupture of a known earthquake fault.

Seismic Ground Shaking
Due to the City’s proximity to several major faults, there is a significant potential for seismic ground shaking to occur. The General Plan Update EIR identified that although there is no way to avoid ground shaking and earthquake hazards, compliance with the California Building Code (CBC), including specific provisions for seismic design would mitigate and minimize the effects of earthquakes. The CBC is accepted as the basic design standard for the City and Riverside County (City of Corona 2019). The Project would be IJ
City of Corona General Plan Housing Element Rezoning Program Update Project Initial Study
Environmental Setting, Analysis, and Mitigation Measures 3-30
required to design structures in accordance with the CBC requirements to minimize the effects of ground shaking to the greatest degree feasible, and therefore, Project implementation would have a less than significant impact related to seismic ground shaking.

Seismic related ground failure (liquefaction)
According to the General Plan Update EIR, Figure 5.7-5 Liquefaction Hazards, areas within the City with high to very high liquefaction susceptibility are located within the northern portion of the City (City of Corona 2019). The majority of the Project site is located in areas with very low to low susceptibility to liquefaction, with a small portion being located in areas with moderate susceptibility. The General Plan Update EIR identifies that although liquefaction is expected within the City, mandatory compliance with existing regulations, including the preparation and submittal of soil engineering reports, reduces liquefaction impacts to new developments within the area to a less than significant level. Therefore, with compliance with existing regulations and preparation of soil engineering reports, Project implementation would have a less than significant impact related to seismic related ground failure.

Landslides
According to Figure 5.7-3 of the General Plan Update EIR, the Project is not located within areas with high landslide hazard potential (City of Corona 2019). The General Plan Update EIR identified that any grading permit for a hillside development must have an engineering geology report prepared and submitted to the City. Compliance with this requirement would reduce impacts and landslide impacts are not expected for any new developments in the City. Therefore, Project implementation would have a less than significant impact related to landslides.

City Municipal Code Chapter 15.36, Grading Regulations, requires submittal of grading plans and a geotechnical evaluation to minimize differential settlement and the slipping or sliding of earth, minimizing impacts from unstable geologic or soil conditions. The City also requires a soils engineering report that includes an evaluation to determine the presence of expansive or corrosive soil conditions. The recommendations in the geotechnical reports (soils engineering, engineering geology, and seismicity reports) are required to be incorporated into the grading plans and implemented during construction of projects. Mandatory compliance with existing regulations, including the preparation and submission of soil engineering studies, geotechnical evaluations, and seismicity reports for new developments would reduce potential impacts to a less than signification level. Additionally, the Project would be required to comply with General Plan policies related to seismic and geologic hazards. Therefore, by complying with applicable regulations, preparation of required reports and studies, and compliance with relevant General Plan policies, future residential development resulting from Project implementation would not cause substantial adverse effects involving rupture of a fault, seismic ground shaking, ground failure, or landslides, and impacts would be less than significant. As such, this topic does not require further evaluation in an EIR.

IJ
City of Corona General Plan Housing Element Rezoning Program Update Project Initial Study
Environmental Setting, Analysis, and Mitigation Measures 3-31
b) Would the project result in substantial soil erosion or the loss of topsoil? Finding: Less than Significant Impact
The General Plan Update EIR identified that soils in the City are prone to erosion during the grading phase of development projects. To reduce the potential for erosion during construction activities, a Storm Water Pollution Prevention Plan (SWPPP), which specifies best management practices (BMPs) for temporary erosion control measures, is required. Standard erosion control measures would be implemented as part of the SWPPP to minimize the risk of erosion or sedimentation during construction. Additionally, the SWPPP is required to include an erosion control plan that describes measures such as phased grading, limiting areas of disturbance, and diverting runoff from disturbed areas. The erosion control plan, which is required under Section 15.36.060 of the City’s Municipal Code, would also be required to include treatment measures to trap sediment. The Project would be required to prepare and implement a SWPPP and erosion control plan to minimize soil erosion impacts that could result from Project implementation. Therefore, future residential development resulting from Project implementation would not result in substantial soil erosion or the loss of topsoil, and impacts would be less than significant. As such, this topic does not require further evaluation in an EIR.
c) Would the project be located on geologic unit or soil that is unstable, or that would become unstable as a result of the project, and potentially result in on- or off-site landslide, lateral spreading, subsidence, liquefaction, or collapse?
Finding: Less than Significant Impact
The General Plan Update EIR identified that the City’s Municipal Code Chapter 15.36 requires development projects to submit grading plans and a geotechnical evaluation to minimize differential settlement and the slipping or sliding of earth. Compliance with this requirement would minimize impacts resulting from unstable geologic or soil conditions. Additionally, the City requires a soils engineering report that describes and evaluates the nature, distribution, and physical and chemical properties of existing soils to identify the presence of expansive or corrosive soil conditions. As described above, the recommendations included in the geotechnical reports are required to be included in the grading plans and implemented during project development. Furthermore, the General Plan Update EIR describes that site specific mass grading and compaction that would occur as part of future development in the City would mitigate any potential impacts from seismically induced lateral spreading, settlement, and collapse. Compliance with existing regulations, including the preparation and implementation of soil engineering and geotechnical evaluations for new developments, would reduce impacts to a less than significant level. Therefore, future residential development resulting from Project implementation would not be located on a geologic unit or soil that is unstable or that would become unstable as a result of Project implementation, and impacts would be less than significant. As such, this topic does not require further evaluation in an EIR.

IJ
City of Corona General Plan Housing Element Rezoning Program Update Project Initial Study
Environmental Setting, Analysis, and Mitigation Measures 3-32
d) Would the project be located on expansive soil, as defined in Table 18-1-B of the Uniform Building Code (1994), creating substantial direct or indirect risks to life or property? Finding: Less than Significant Impact
The General Plan Update EIR identified that the City and SOI are known to have a low to moderate potential for expansive soils, and the presence of expansive soils in areas proposed for construction would be considered a potentially significant impact. However, the General Plan Update EIR identifies that implementation of existing codes, regulations and policies that serve to mitigate impacts of development within areas containing expansive soils would reduce impacts to a less than significant level. The Project would be required to prepare and submit a soil engineering report, and geotechnical evaluations as required under Chapter 15.36 of the Municipal Code. Recommendations in the geotechnical reports are required to be implemented into grading plans and during construction activities related to future residential development resulting from Project implementations. Additionally, the Project would be required to comply with CBC and grading regulations that would minimize the risks associated with development proposed in areas containing expansive soils. With implementation of recommendations included in geotechnical reports and adherence to existing regulations related to development in areas with expansive soils, impacts would be less than significant. As such, this topic does not require further evaluation in an EIR. e) Would the project have soils incapable of adequately supporting the use of septic tanks or alternative wastewater disposal systems where sewers are not available for the disposal of wastewater?
Finding: No Impact
General Plan policy IU-3.8 requires that new developments be connected to the City’s sewer system.

Therefore, future residential development resulting from Project implementation would not require the use of septic tanks or alternative waste disposal systems, and there would be no impact. As such, this topic does not require further evaluation in an EIR.
f) Would the project directly or indirectly destroy a unique paleontological resource or site or unique geological feature?
Finding: Less than Significant with Mitigation Incorporation There are multiple known fossil localities within the City and its vicinity. As shown in General Plan Update EIR Figure 5.7-6, areas of the City that include potential Project rezoning parcels are identified as high sensitivity to paleontological resources and low-to-high sensitivity that increases with depth. The Project is proposing rezoning and AHO zones for parcels within the City, in order to provide for more areas where higher-density residential development could be constructed. This would result in an increased intensity of construction activities, including grading that could occur on land within the City with sensitivity to paleontological resources, and unknown paleontological resources could be unearthed. Implementation of the proposed Project would require compliance with policies included in the General Plan pertaining to paleontological resources. However, the General Plan Update EIR identifies that although compliance with IJ
City of Corona General Plan Housing Element Rezoning Program Update Project Initial Study
Environmental Setting, Analysis, and Mitigation Measures 3-33
General Plan policies would minimize impacts to paleontological resources from new development and redevelopment, soil excavations would continue to have the potential for significant impacts on paleontological resources. Therefore, the General Plan Update EIR identified Mitigation Measures GEO-1 through GEO-6 to mitigate impacts to a less than significant level.

Mitigation Measure GEO-1 through GEO-6 prescribe requirements for monitoring based on the sensitivity of sites in the City for paleontological resources. Mitigation Measures GEO-1, GEO-2, GEO-3, and GEO-6 are applicable to the Project. Mitigation Measures GEO-4 and GEO-5 pertain to Projects located in areas mapped as having low or unknown sensitivity, and as the Project area is located in areas mapped as high and low-to-high sensitivity, these mitigation measures are not applicable to the Project. Therefore, with implementation of General Plan policies and General Plan Update EIR Mitigation Measures GEO-1, GEO2, GEO-3 and GEO-6, impacts to paleontological resources from future residential development resulting from Project implementation would be mitigated to a less than significant level. As such, this topic does not require further evaluation in an EIR.

Mitigation Measure GEO-1: High and Low-to-High Sensitivity. In areas designated as having “high” or “low-to-high” sensitivity for paleontological resources, the project applicant shall be required to submit a Paleontological Resources Monitoring and Mitigation Plan (PRMMP). The PRMMP shall be prepared by a Qualified Paleontologist meeting the standards of Society of Vertebrate Paleontology (2010). The plan shall address specifics of monitoring and mitigation based on the project area and project’s construction plan, and shall take into account updated geologic mapping, geotechnical data, updated paleontological records searches, and changes to the regulatory framework at the time of analysis. The PRMMP shall be submitted to the City of Corona’s Community Development Department prior to approval of a grading permit.

Mitigation Measure GEO-2: High Sensitivity. Projects involving ground disturbances in previously undisturbed areas mapped as having “high” paleontological sensitivity shall be monitored by a qualified paleontological monitor on a full-time basis, under the supervision of the Qualified Paleontologist.

Monitoring shall include inspection of exposed sedimentary units during active excavations within sensitive geologic sediments. The monitor shall have authority to temporarily divert activity away from exposed fossils to evaluate the significance of the find and, if the fossils are determined to be significant, professionally and efficiently recover the fossil specimens and collect associated data. The paleontological monitor shall use field data forms to record pertinent location and geologic data, measure stratigraphic sections (if applicable), and collect appropriate sediment samples from any fossil localities.

Mitigation Measure GEO-3: Low-to-High Sensitivity. Projects involving ground disturbance in previously undisturbed areas mapped with “low-to-high” paleontological sensitivity shall require monitoring if construction activity exceeds the depth of the low-sensitivity surficial sediments. The underlying sediments may have high sensitivity; therefore, work in those units shall require paleontological monitoring, as designated by the Qualified Paleontologist in the Paleontological Resources Monitoring and Mitigation Plan (PRMMP).

Mitigation Measure GEO-6: All Projects. In the event of any fossil discovery, regardless of depth or geologic formation, construction work shall halt within a 50-foot radius of the find until its significance can be determined by a Qualified Paleontologist. Significant fossils shall be recovered, prepared to the point of IJ
City of Corona General Plan Housing Element Rezoning Program Update Project Initial Study
Environmental Setting, Analysis, and Mitigation Measures 3-34
curation, identified by qualified experts, listed in a database to facilitate analysis, and deposited in a designated paleontological curation facility in accordance with the standards of the Society of Vertebrate Paleontology (2010). The most likely repository is the Natural History Museum of Los Angeles County (NHMLA). The repository shall be identified, and a curatorial arrangement shall be signed, prior to collection of the fossils.

IJ
City of Corona General Plan Housing Element Rezoning Program Update Project Initial Study
Environmental Setting, Analysis, and Mitigation Measures 3-35

3.8 GREENHOUSE GASES

GREENHOUSE GAS EMISSIONS
Would the project:

Potentially
Significant
Impact
Less Than
Significant
with Mitigation
Incorporation
Less than
Significant
Impact
No
Impact
a) Generate greenhouse gas emissions, either directly
or indirectly, that may have a significant impact on
the environment?
b) Conflict with an applicable plan, policy or regulation adopted for the purpose of reducing the emissions
of greenhouse gases?

3.8.1 Environmental Setting
An emissions inventory of the City of Corona and SOI was conducted for the General Plan Update EIR for the existing residential, institutional, commercial, office, and industrial uses identified on Figure 3-4, Existing Land Use in the General Plan Update EIR. GHG emissions generated in the City and SOI were estimated using EMFAC2017, OFFROAD2017, and data provided by SCE (electricity), SoCalGas (natural gas), and the City of Corona (electricity and water use). Emissions in the City and SOI come from the following sources:
• Transportation: Emissions from vehicle trips beginning and ending in the City and SOI boundaries and from external/internal vehicle trips (i.e., trips that either begin or end in the City and SOI). • Energy: Emissions generated from purchased electricity and natural gas consumption used for cooking and heating in the City and SOI.
• Solid Waste Disposal: Indirect emissions from waste generated in the City and SOI. • Water/Wastewater: Emissions from electricity used to supply, treat, and distribute water based on the overall water demand and wastewater generation in the City and SOI. • Area Sources: Emissions generated from light commercial equipment, agricultural, and construction equipment use in the City and SOI.

3.8.2 Environmental Impact Analysis
a) Would the project generate greenhouse gas emissions, either directly or indirectly, that may have a significant impact on the environment?
Finding: Potentially Significant Impact
This Project sets the framework for future growth and development in the City by providing additional opportunities for development of low- and moderate-income housing and therefore, does not directly result in development. Certification of the Project itself would not lead to direct greenhouse gas emissions; however, development of the identified parcels would result in greenhouse gas emissions, and therefore, ~ □ □ □
~ □ □ □
IJ
City of Corona General Plan Housing Element Rezoning Program Update Project Initial Study
Environmental Setting, Analysis, and Mitigation Measures 3-36
the Project could generate greenhouse gas emissions that may have a significant impact on the environment. Therefore, this potentially significant impact will be further analyzed in the EIR. b) Would the project conflict with an applicable plan, policy or regulation adopted for the purpose of reducing the emissions of greenhouse gases?
Finding: Potentially Significant Impact
The Project identified parcels in the City to be rezoned and proposes to establish an AHO zone to allow for more residential development in the City. Development of the parcels would require activities that would result in more greenhouse gas emissions. Therefore, Project implementation may conflict with an applicable plan, policy, or regulation adopted for the purpose of reducing emissions and greenhouse gases, and this potentially significant impact will be further analyzed in the EIR.

IJ
City of Corona General Plan Housing Element Rezoning Program Update Project Initial Study
Environmental Setting, Analysis, and Mitigation Measures 3-37

3.9 HAZARDS AND HAZARDOUS MATERIALS

HAZARDS AND HAZARDOUS MATERIALS
Would the project:

Potentially
Significant
Impact
Less Than
Significant
with Mitigation
Incorporation
Less than
Significant
Impact
No
Impact
a) Create a significant hazard to the public or the
environment through the routine transport, use, or
disposal of hazardous materials?
b) Create a significant hazard to the public or the
environment through reasonably foreseeable upset and
accident conditions involving the release of hazardous
materials into the environment?
c) Emit hazardous emissions or handle hazardous or
acutely hazardous materials, substances, or waste
within one-quarter mile of an existing or proposed
school?
d) Be located on a site which is included on a list of
hazardous materials sites compiled pursuant to
Government Code Section 65962.5 and, as a result,
would it create a significant hazard to the public or the environment?
e) For a project located within an airport land use plan or, where such a plan has not been adopted, within two
miles of a public airport or public use airport, would the project result in a safety hazard or excessive noise for people residing or working in the project area?
f) Impair implementation of or physically interfere with an adopted emergency response plan or emergency
evacuation plan?
g) Expose people or structures, either directly or indirectly, to a significant risk of loss, injury or death involving wildland fires?

3.9.1 Environmental Setting
Hazardous materials include, but are not limited to, hazardous substances, hazardous wastes, and any material that a business or implementing agency has a reasonable basis for believing would be injurious to public health and safety or harmful to the environment if released into the workplace or the environment.

The City’s hazardous waste generators include more than 300 licensed commercial and industrial businesses and uses that generate some form of hazardous materials or waste. The EPA regulates generators of hazardous waste based on the amount of waste generated. Major concentrations of industrial land uses in the City and the General Plan SOI are located near the BNSF Railway tracks and SR 91 in the northern half of the City and SOI, and two sand and gravel quarries are located in the northeast quadrant of the City and SOI. Other additional industrial land uses are scattered throughout the City (City of Corona 2019). Additionally, there are several hazardous materials cleanup sites within the City and SOI that are listed on several databases, including the State Water Resources Control Board Geotracker website. □ □ ~ □
□ □ ~ □
□ □ ~ □
□ □ ~ □
□ □ ~ □
□ □ ~ □
□ □ ~ □
IJ
City of Corona General Plan Housing Element Rezoning Program Update Project Initial Study
Environmental Setting, Analysis, and Mitigation Measures 3-38

3.9.2 Environmental Impact Analysis
a) Would the project create a significant hazard to the public or the environment through the routine transport, use, or disposal of hazardous materials? Finding: Less than Significant Impact
Construction
Construction activities associated with future residential development resulting from Project implementation is anticipated to involve demolition, grading, and construction of new structures. Hazardous materials, such as paints, sealants, solvents, diesel fuels, and other typical construction materials, would be used during construction, resulting in the potential for these materials to spill or create hazardous conditions. Future residential development resulting from Project implementation would be required to comply with all applicable regulations and General Plan policies that would minimize risks associated with the use of hazardous materials during construction activities, and they would be required to adhere to all emergency response plan requirements set forth by the Corona Fire Department (CFD) throughout Project implementation.

Operation
The Project is proposing the rezoning and establishment of AHO zones for identified parcels in the City to allow for more residential development. Though the parcels would be zoned and designated for residential uses, some residential zoning in the City allows for a variety of land uses, including mixed-use, commercial, office, civic, and open space uses. Operation of future residential uses would involve the use of small amounts of hazardous materials used for routine cleaning and maintenance purposes, such as paints, household cleaners, fertilizers, and pesticides. If the parcels are not developed with residential uses but with a retail/commercial use, the use of commercial-grade chemicals, cleaners, and solvents would be anticipated. With the implementation of applicable General Plan policies and compliance with all applicable regulations related to the transport, use, and disposal of hazardous materials, future residential development resulting from Project implementation would not create a significant hazard to the public or environment, and impacts would be less than significant. As such, this topic does not require further evaluation in an EIR.
b) Would the project create a significant hazard to the public or the environment through reasonably foreseeable upset and accident conditions involving the release of hazardous materials into the environment?
Finding: Less than Significant Impact
The transport, use, storage, and disposal of hazardous materials and waste could result in accidental releases into the environment. However, compliance with applicable laws and regulations would minimize the potential for releases of hazardous materials that could pose harm to the public or environment. The Project proposes residential uses for identified parcels within the City. As residential uses utilize small IJ
City of Corona General Plan Housing Element Rezoning Program Update Project Initial Study
Environmental Setting, Analysis, and Mitigation Measures 3-39
amounts of hazardous materials, such as cleansers and pesticides, mostly or entirely used for routine cleaning and maintenance purposes, future residential development resulting from Project implementation would not pose substantial hazards to the public or environment through accidental releases. Additionally, future residential development resulting from Project implementation would be required to follow General Plan policies that would minimize risks associated with the accidental release of hazardous materials.

Therefore, by complying with existing laws, regulations, and General Plan policies, future residential development resulting from Project implementation would not create a significant hazard through reasonably foreseeable upset and accident conditions, and impacts would be less than significant. As such, this topic does not require further evaluation in an EIR. c) Would the project emit hazardous emissions or handle hazardous or acutely hazardous materials, substances, or waste within one-quarter mile of an existing or proposed school? Finding: Less than Significant Impact
The potential Project site parcels identified for rezoning and the AHO zone are spread throughout the City, and some parcels would be located within one-quarter mile of an existing or proposed school. Future residential development resulting from Project implementation would be required to comply with existing laws and regulations regarding hazardous materials, waste, and emissions to minimize the potential for hazardous emissions to occur. Construction activities would require the use of routine hazardous materials; however, the use of such materials used during construction would be in accordance with all applicable local, state, and federal laws regarding hazardous materials and would be enforced at the construction site.

Compliance with existing regulations would ensure that the public is not exposed to risks related to hazardous emissions from construction activities.

Residential uses planned for the sites would utilize small amounts of common hazardous materials, such as cleansers and pesticides used for routine cleaning and maintenance purposes. The small amounts of common hazardous materials typically utilized for residential uses would not emit hazardous emissions that would pose risks to the public, and Project implementation would not result in the handling of substantial amounts of hazardous materials, substances, or waste within one-quarter mile of an existing or proposed school.

Although potential Project sites would be designated for residential uses, these sites could be developed with other non-residential uses, such as commercial and retail uses. If the Project sites are developed with businesses handling large quantities of hazardous materials, it would be required to maintain business plans including procedures in the event of a hazardous materials release, procedures for immediate notification of all appropriate agencies and personnel, identification of local emergency medical assistance, contact information for company emergency coordinators, a list and location of emergency equipment at the business, an evacuation plan, and a training program for business personnel (City of Corona 2019).

The business would be required to have procedures in place to ensure that operation does not result in emission of hazardous substances. Therefore, future residential development resulting from Project implementation would not emit hazardous emissions or handle hazardous or acutely hazardous materials, substances, or waste within one-quarter mile of an existing or proposed school, and impacts would be less than significant. As such, this topic does not require further evaluation in an EIR.

IJ
City of Corona General Plan Housing Element Rezoning Program Update Project Initial Study
Environmental Setting, Analysis, and Mitigation Measures 3-40
d) Would the project be located on a site which is included on a list of hazardous materials sites compiled pursuant to Government Code Section 65962.5 and, as a result, would it create a significant hazard to the public or the environment?
Finding: Less than Significant Impact
According to the General Plan Update EIR, there are numerous hazardous materials sites located within the City and its SOI. Development associated with Project implementation may disturb soil in which soil, soil vapor, and/or groundwater may be contaminated with hazardous materials exceeding the environmental screening levels for the proposed land uses.

Any development that occurs on Project-identified parcels that would be located on or next to a hazardous materials site would be required to complete an environmental site assessment (ESA) by a qualified professional to ensure that the future development projects would not disturb hazardous materials sites and that any proposed development would not create a substantial hazard to the public or the environment. The Project would be required to prepare and submit a Phase I ESA, and if the Phase I identified recognized environmental conditions at the site, it would recommend preparation of a Phase II ESA, which would consist of sampling and testing of soil, soil vapor, and groundwater for hazardous materials and human health risks assessments based on concentrations of the hazardous materials identified. Future residential development resulting from Project implementation would be required to implement the recommendations included in the ESAs to remediate hazardous materials before the City would issue building permits. If a future parcel that is developed under the Project is located on a property contaminated by hazardous substances, compliance with laws and regulations for investigations and remediation regulated at the local, state, and federal level would be required. Additionally, future residential development resulting from Project implementation would be required to implement General Plan policies that would minimize risks from hazardous materials sites. As Project implementation would require adherence to General Plan policies, compliance with applicable laws and regulations regarding hazardous materials sites, and preparation of environmental site assessments, impacts would be less than significant. e) For a project located within an airport land use plan or, where such a plan has not been adopted, within two miles of a public or private airport or public use airport, would the project result in a safety hazard or excessive noise for people residing or working in the project area? Finding: Less than Significant Impact
The closest airport to the City is the Corona Municipal Airport, located approximately three miles northwest of Downtown Corona. Portions of the City are within an airport influence area (which is part of the airport land use plan), which is generally the area in which current or future airport related noise-overflight, safety, or airspace protection factors may affect land uses or necessitate restrictions on those uses (City of Corona 2019). As shown in General Plan Update EIR Figure 5.9-3, the majority of the parcels identified for rezoning as part of the Project are not located within the Corona Municipal Airport influence area. There is one parcel located within Zone D, which is identified as the Primary Traffic Patterns and Runway Buffer Zone. This refers generally to an area that includes most of the regular air traffic patterns and pattern entry routes.

Prohibited uses within Zone D are highly noise sensitive outdoor nonresidential uses and hazards to flight.

IJ
City of Corona General Plan Housing Element Rezoning Program Update Project Initial Study
Environmental Setting, Analysis, and Mitigation Measures 3-41
The sole identified parcel located within Zone D is proposed for the AHO zone, which would allow for the property to be redeveloped with residential land uses and would be consistent with the airport land use plan with the safety zones. Therefore, future residential development resulting from Project implementation would not result in a safety hazard or excessive noise for people residing or working in the project area, and impacts would be less than significant. As such, this topic does not require further evaluation in an EIR. f) Would the project impair implementation of or physically interfere with an adopted emergency response plan or emergency evacuation plan?
Finding: Less than Significant Impact
The Project would be required to comply with all emergency response plans and emergency evacuation plans that have been adopted by the City. The City has prepared an Emergency Operations Plan (EOP) and a Local Hazard Mitigation Plan (LHMP) to identify the City’s hazards and address the City’s planned response to disasters. Additionally, the City has developed Structure Protections Plans (SPPs) to address evacuation routes. The Riverside County Strategic Contingency Plan coincides with the Corona SPP and incorporates these evacuation routes. CFD amended the Fire Code as part of the 2019 Building Code adoption, which now includes a requirement for two points of access for all new development and for areas proposing increased residential densities, such as the proposed Project. All developments that are constructed on parcels identified for the Project would be required to comply with these standards and regulations pertaining to emergency access, response, and preparedness. Future residential development resulting from Project implementation would not include changes to existing roadways that would interfere with identified emergency evacuation routes. Project construction and operation would be completed in accordance with all adopted emergency response plans and emergency evacuation plans. Additionally, the Project would be required to implement General Plan policies which ensure adequate, efficient and safe access for emergency vehicles and ensure that efficient, orderly notification and evacuation is provided, as well as to maintain roadway evacuation routes, to facilitate evacuations and ensure proper functionality after an emergency. Future residential development resulting from Project implementation would be required to implement the City’s EOP, LHMP, SPPs and any other applicable adopted emergency plan and relevant General Plan policies. Project implementation would require future development to be constructed and operated in accordance with City requirements for emergency access; therefore, future residential development resulting from Project implementation would not impair implementation of or physically interfere with an adopted emergency response plan or emergency evacuation plan, and impacts would be less than significant. As such, this topic does not require further evaluation in an EIR. g) Would the project expose people or structures, either directly or indirectly, to a significant risk of loss, injury or death involving wildland fires?
Finding: Less than Significant Impact
The City is surrounded by extensive open space areas that are susceptible to wildfire and encroachment into the community. A majority of the undeveloped area surrounding the City is designated as a Very High Fire Hazard Severity Zone (VHFHSZ) by CAL FIRE. While a majority of the areas surrounding the City to the north, west, and south are within designated VHFHSZs, the central portion of the City is not designated IJ
City of Corona General Plan Housing Element Rezoning Program Update Project Initial Study
Environmental Setting, Analysis, and Mitigation Measures 3-42
as a VHFHSZ and is designated as a local responsibility non-VHFHSZ (CAL FIRE 2009). Additionally, the United States Forest Service (USFS) classifies a majority of the City as non-burnable, with some areas ranging from low to moderate wildfire hazard potential, with high and very high wildfire hazard potential areas located along the undeveloped portions surrounding the City (USFS 2020).

Parcels identified for rezoning and the AHO zone as part of the Project are located in the central portion of the City and are not located in hillside areas or areas with urban-wildland interfaces. Project implementation would not place assets in a VHFHSZ, as future developments would be located within urbanized areas of the City. Future residential development resulting from Project implementation would be required to adhere to a wide range of state and local codes pertaining to fire protection and would be required to abide by CFD’s SPP. Adherence to the measures in the SPPs would minimize impacts to the extent possible and would ensure that new developments would not expose people or structures to significant risks associated with wildland fires. Additionally, future residential development resulting from Project implementation would be required to implement General Plan policies identified to minimize risk from wildfire hazards. Therefore, with implementation of applicable state and local codes and adherence to the SPP, future residential development resulting from Project implementation would not expose people or structures to significant wildland fire risks, and impacts would be less than significant. As such, this topic does not require further evaluation in an EIR.

IJ
City of Corona General Plan Housing Element Rezoning Program Update Project Initial Study
Environmental Setting, Analysis, and Mitigation Measures 3-43

3.10 HYDROLOGY AND WATER QUALITY

HYDROLOGY AND WATER QUALITY
Would the project:

Potentially
Significant
Impact
Less Than
Significant with
Mitigation
Incorporation
Less than
Significant
Impact
No
Impact
a) Violate water quality standards or waste discharge
requirements or otherwise substantially degrade
surface or groundwater quality?
b) Substantially decrease groundwater supplies or
interfere substantially with groundwater recharge such
that the project may impede sustainable groundwater
management of the basin?
c) Substantially alter the existing drainage pattern of the site or area, including through the alteration of the
course of a stream or river or through the addition of
impervious surfaces, in a manner which would:
i. Result in substantial erosion or siltation on- or
off-site;
ii. Substantially increase the rate or amount of
surface runoff in a manner which would result
in flooding on- or off-site;
iii. Create or contribute runoff water which would
exceed the capacity of existing or planned
stormwater drainage systems or provide
substantial additional sources of polluted
runoff; or
iv. Impede or redirect flood flows.
d) In flood hazard, tsunami, or seiche zones, risk release of pollutants due to project inundation?
e) Conflict with or obstruct implementation of a water
quality control plan or sustainable groundwater
management plan?

3.10.1 Environmental Setting
The City is situated within the regional Santa Ana River Watershed, a flood control zone that is monitored by the Santa Ana RWQCB. Within Riverside County, the regional watershed is subdivided into the Santa Ana Sub-watershed consists of the Santa Ana River and its tributaries and the San Jacinto River Subwatershed includes the San Jacinto River and its tributaries that overflow into the Santa Ana River during high volume storm events. All channels converge with the Santa Ana River where downstream ends of the channel travel through Orange County prior to emptying into the Pacific Ocean (City of Corona 2019).

The Santa Ana Sub-watershed is further divided into smaller sub-watersheds based on major tributary channels that feed into the Santa Ana River. The City lies within two of the smaller sub-watersheds: the Middle Santa Ana River Sub-watershed and the Temescal Wash Sub-watershed. The Middle Santa Ana River Sub-watershed is located in the northwest corner of Riverside County and covers a total tributary area of approximately 170 square miles that generally drains westwards towards the Santa Ana River. The □ □ ~ □
□ □ ~ □
□ □ ~ □
□ □ ~ □
□ □ ~ □
IJ
City of Corona General Plan Housing Element Rezoning Program Update Project Initial Study
Environmental Setting, Analysis, and Mitigation Measures 3-44
Temescal Sub-watershed covers approximately 250 square miles and is defined as the tributary area draining into the Temescal Wash, also known as Temescal Creek, that connects Lake Elsinore with the Santa Ana River. A majority of the City lies within this sub-watershed, and the drainage channels that run through the City that tie into the Temescal Wash include Arlington Channel, Main Street Channel, Oak Street Drain, Joseph Canyon Wash, and Bedford Wash (City of Corona 2019).

The Middle Santa Ana River Groundwater basin contains twelve management zones: Arlington, bedford, Coldwater, Elsinore, Lee Lake, Riverside A through F, and Temescal. The City of Corona resides within the Bedford, Coldwater, and Temescal management zones. The Temescal subbasin underlies the southwest part of the upper Santa Ana Valley. Main recharge to the groundwater reservoir is from percolation of precipitation on the valley floor and infiltration of stream flow within tributaries exiting the surrounding mountains and hills. The Bedford subbasin is located south of the Temescal subbasin in Temescal Canyon between the Santa Ana Mountains and the El Sobrante Hills. The Coldwater subbasin is located southwest of the Bedford subbasin and Temescal Wash (City of Corona 2019).

3.10.2 Environmental Impact Analysis
a) Would the project violate any water quality standards or waste discharge requirements or otherwise substantially degrade surface or groundwater quality? Finding: Less than Significant Impact
Construction
Construction activities related to Project implementation could impact water quality due to erosion and other pollutants entering construction site runoff, resulting in polluted runoff entering the City’s stormwater system. Construction activities such as grading could accelerate the rate of erosion and cause substantial impacts to water quality. However, the General Plan Update EIR identifies that implementation of state and local regulations would mitigate construction stormwater runoff impacts. The City’s grading ordinance includes expanded requirements for grading, site erosion control, and National Pollutant Discharge Elimination System (NPDES) requirements. Additionally, any projects that include one acre or greater of soil disturbance is required to comply with the Construction General Permit and associated NPDES regulations to ensure that potential for soil erosion is minimized. Future development associated with Project implementation would be required to comply with all relevant NPDES requirements and would be required to prepare a SWPPP. The SWPPP would be required to include construction BMPs that address pollutant source reduction and provide measures of controls necessary to mitigate potential pollutant sources. The Project would also be required to implement General Plan policies that would ensure that new development minimizes potential water quality impacts. Therefore, with the implementation of General Plan policies, adherence to NPDES and Construction General Permit requirements, such as the preparation of a SWPPP, and adherence to all relevant state and local regulations, construction activities associated future residential development resulting from Project implementation would not violate water quality standards or waste discharge requirements, and impacts would be less than significant.

IJ
City of Corona General Plan Housing Element Rezoning Program Update Project Initial Study
Environmental Setting, Analysis, and Mitigation Measures 3-45
Operation
Operation of projects associated with the proposed rezoning Project could potentially create new sources of polluted runoff and increase post-construction pollutants. To prevent long-term impacts related to Project operation, the Project would be required to comply with requirements of the City’s Municipal Code Chapter

13.27 and the Riverside County MS4 permit. Municipal Code Chapter 13.27 and Riverside County MS4 permit requires new development and significant redevelopment projects to incorporate Low Impact Development (LID)/site design and incorporate source control BMPs to address post-construction stormwater runoff management. Future residential development projects resulting from Project implementation would also be required to prepare a project-specific Water Quality Management Plan (WQMP) that described the BMPs chosen for the Project, as well as include operation and maintenance requirements for all structural and treatment control BMPs. Additionally, future residential development resulting from Project implementation would incorporate General Plan policies which ensure that new development minimizes potential water quality impacts. With the adherence to federal, state, and local regulations and requirements and relevant General Plan policies, runoff associated with both construction and operation of future residential development resulting from implementation of the Project would not violate any water quality standards or discharge requirements, and impacts would be less than significant.

As such, this topic does not require further evaluation in an EIR. b) Would the project substantially decrease groundwater supplies or interfere substantially with groundwater recharge such that the project may impede sustainable groundwater management of the basin?
Finding: Less than Significant Impact
The Project is proposing rezoning parcels in the City and the establishment of AHO zones to allow for more residential developments within the City than what was planned in the General Plan Update. This would result in an increase in population which could generate a higher demand for groundwater resources.

According to the General Plan Update EIR, the City relies on local groundwater resources for approximately 40 percent of its water supply (City of Corona 2019). The City updates its urban water management plan (UWMP) every five years to evaluate existing and projected water supplies and demands to ensure that there will not be any water supply shortages or significant groundwater depletion. The City’s 2020 UWMP identified that there are sufficient surface and groundwater supplies through 2045 (City of Corona 2021a).

According to the City’s 2020 UWMP, the Department of Water Resources (DWR) released their final list of critically overdrafted basins in February 2019. This list did not include the Temescal Basin or the BedfordColdwater Basin which are the two groundwater basins supplying water to the City. The Project would be required to comply with the City’s groundwater management plan and Recharge Master Plan to ensure there are no impacts to groundwater supplies and the Project would not impede sustainable groundwater management. Future residential development resulting from Project implementation is not expected to result in a substantial increase in population as compared to what was forecasted in the General Plan Update. Furthermore, Project implementation would not result in a substantial increase in groundwater usage that would result in substantially decreased groundwater supplies.

IJ
City of Corona General Plan Housing Element Rezoning Program Update Project Initial Study
Environmental Setting, Analysis, and Mitigation Measures 3-46
Additionally, the City requires adherence to the Water Efficient Landscape Ordinance and Local Implementation Plan which includes policies and regulations pertaining to hydromodification caused by new developments and water efficiency requirements. Adherence to the Water Efficient Landscape Ordinance and Local Implementation Plan would ensure that new developments allow for groundwater recharge at a development site through site design, by allowing infiltration of groundwater, and Project implementation would include water efficiency measures to ensure groundwater supplies are not affected by future development. The General Plan also includes several policies that would decrease the demand for potable water in the City, thereby further ensuring that groundwater supplies are not depleted. With the implementation of relevant regulations and adherence to General Plan policies and the City’s groundwater management plans, Project implementation would not result in substantially decreased groundwater supplies or interfere with groundwater recharge, such that future residential development resulting from Project implementation would impede sustainable groundwater management. Therefore, impacts would be less than significant, and this topic does not require further evaluation in an EIR. c) Would the project substantially alter the existing drainage pattern of the site or area, including through the alteration of the course of a stream or river or through the addition of impervious surfaces, in a manner which would;
i. Result in substantial erosion or siltation on- or off-site; ii. Substantially increase the rate or amount of surface runoff in a manner which would result in flooding on- or off-site;
iii. Create or contribute runoff water which would exceed the capacity of existing or planned stormwater drainage systems or provide substantial additional sources of polluted runoff; or
iv. Impede or redirect flood flows.

Finding: Less than Significant Impact
Development of the Project would result in changes in land uses which may result in an increase of impervious surfaces. However, parcels identified for the Project are located in areas surrounded by existing developments and would utilize the existing City and County drainage facilities in the existing surrounding areas. The Project would implement the City’s hydromodification requirement and standard flood control requirements for new developments which would minimize impacts of increased flows and volumes of downstream receiving waters. Additionally, Project implementation would require future developments to comply with the City and County’s standard conditions of approval, requiring all new development and significant redevelopment projects to complete drainage and hydrology analyses to ensure that on- and offsite drainage facilities can accommodate increased runoff. Implementation of standard conditions of approval which include incorporation of LID designs, BMPs, and onsite retention basins, would minimize runoff volumes and rates. Future residential development resulting from Project implementation would also be required to prepare a WQMP describing the BMPs and site design measures which would be implemented to minimize runoff from the site.

IJ
City of Corona General Plan Housing Element Rezoning Program Update Project Initial Study
Environmental Setting, Analysis, and Mitigation Measures 3-47
Project implementation would result in construction activities that could increase the potential for erosion and siltation to occur on- and off-site. The General Plan includes policies that ensure new developments minimize erosion and siltation to reduce impacts to stormwater systems. As discussed above, future development projects would be required to prepare and implement a SWPPP, including standard erosion control measures and BMPs to minimize the risk of polluted runoff resulting from increased erosion and sedimentation. The SWPPP would include an erosion control plan that identifies measures, such as diverting runoff from disturbed areas and treatment measures to trap sediment, to ensure there is no polluted runoff.

Much of the central portion of the City is located within the 500-year flood zone but there are areas within the City that are located within the 100-year flood zone. Northwestern Corona, extending from the Prado Dam to the airport, and westward through Santa Ana Canyon are designated as areas within the 100-year flood zone (City of Corona 2019). All new developments in the City are required to meet federal floodplain regulations which would ensure that future developments do not impede or redirect flood flows. The City’s Municipal Code Title 18, Floodplain Management, minimizes public and private losses due to flood conditions in areas by restricting or prohibiting uses that result in damaging increases in flood heights or velocity. The code controls the alteration of natural floodplains, stream channels, and natural protective barriers that help accommodate or channel flood waters and prevents or regulates the construction of flood barriers that will unnaturally divert floodwaters or may increase flood hazards in other areas (City of Corona 2019). Additionally, future residential development resulting from Project implementation would be required to implement General Plan policies that would reduce impacts from flooding.

Future residential development resulting from Project implementation would be required to implement General Plan policies and adhere to City and County requirements, such as the preparation of a SWPPP and WQMP and include site design measures to reduce volumes and rate of runoff and polluted runoff.

Therefore, Project implementation would not result in impacts related to erosion, flooding, increased polluted runoff, or substantially increased rate of runoff, and impacts would be less than significant. As such, this topic does not require further evaluation in an EIR. d) Would the project in flood hazard, tsunami, or seiche zones, risk release of pollutants due to project inundation?
Finding: Less than Significant Impact
Much of the central portion of the City is located within the 500-year flood zone but there are areas within the City that are located within the 100-year flood zone. Northwestern Corona, extending from the Prado Dam to the airport and westward through Santa Ana Canyon, are designated as areas within the 100-year flood zone (City of Corona 2019). Future residential development resulting from Project implementation would be required to prepare and implement a SWPPP and WQMP to minimize impacts to water quality.

As discussed above, the General Plan includes several policies that ensure that new developments minimize potential water quality impacts during construction and operation. Therefore, Project implementation would not cause the release of pollutants due to flood inundation, and impacts would be less than significant.

IJ
City of Corona General Plan Housing Element Rezoning Program Update Project Initial Study
Environmental Setting, Analysis, and Mitigation Measures 3-48
General Plan Update EIR Figure 5.10-3 identifies areas of the City that are located in dam inundation zones.

The City is located within the inundation zone for several dams in the area. As identified in the General Plan Update EIR, the probability of fam failure is extremely low and the City has never been impacted by a major dam failure. Dams in California are continually monitored and inspected, and dam owners are required to maintain Emergency Action Plans (EAPs) that include procedures for damage assessment and emergency warnings. The General Plan Update EIR identified that released water from a seiche would result in much smaller footprints than the dam inundation zones, and the probability a seiche occurring is extremely low.

In the rare chance that a seiche does occur, the seiche would flood into the identified dam inundation zones.

Since the probability of seiche inundation to occur is extremely low and only occurs on rare instances, the probability that Project implementation would risk the release of pollutants due to inundation resulting from seiches are extremely low. Therefore, impacts would be less than significant.

The City is located more than 30 miles from the Pacific Ocean and is located outside of the tsunami inundation zone. Therefore, there would be no impacts from tsunamis. As such, this topic does not require further evaluation in an EIR.
e) Would the project conflict with or obstruct implementation of a water quality control plan or sustainable groundwater management plan?
Finding: Less than Significant Impact
Measures identified above to ensure that developments have a less than significant impact on surface and groundwater quality would also ensure that future development does not obstruct or conflict with the implementation of a water quality control plan, such as the Santa Ana Basin Plan or the Santa Ana Watershed Action Plan.

Regulations and policies identified above to protect groundwater supplies and ensure sustainable groundwater management would also ensure that future development does not obstruct or conflict with the City’s groundwater management plan. Future residential development resulting from Project implementation would be required to implement General Plan policies that would ensure that development of new projects would not obstruct with implementation of the watershed action plan for the Santa Ana Watershed Region of Riverside County, the Recharge Master Plan, or the City’s groundwater management plan (City of Corona 2019). Therefore, future residential development resulting from Project implementation would not conflict with or obstruct implementation of a water quality control plan or sustainable groundwater management plan and impacts would be less than significant. As such, this topic does not require further evaluation in an EIR.

IJ
City of Corona General Plan Housing Element Rezoning Program Update Project Initial Study
Environmental Setting, Analysis, and Mitigation Measures 3-49

3.11 LAND USE AND PLANNING

LAND USE AND PLANNING
Would the project:

Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporation
Less than
Significant
Impact
No
Impact
a) Physically divide an established community?
b) Cause a significant environmental impact due to a
conflict with any land use plan, policy, or regulation
adopted for the purpose of avoiding or mitigating an
environmental effect?

3.11.1 Environmental Setting
The City is located in the northwestern portion of Riverside County, near the convergence of Los Angeles, Orange, and Riverside Counties and is located 45 miles southeast of the City of Los Angeles (City of Corona 2019). The City is bordered by the City of Norco to the north, City of Riverside to the east, and Riverside County to the west and the south. The City encompasses 25,551 acres with its SOI consisting of an additional 16,515 acres. The City currently has 31 specific plans where growth buildout would occur.

3.11.2 Environmental Impact Analysis
a) Would the project physically divide an established community? Finding: Potentially Significant Impact
The Project would rezone and establish AHO zones for identified parcels within the City to allow for more low- and moderate-income residential units to be provided than what was proposed in the General Plan Update. Rezoning and establishment of AHO zones could potentially result in development of parcels that would physically divide an established community. Therefore, this impact will be analyzed further in the EIR.
b) Would the project cause a significant environmental impact due to a conflict with any applicable land use plan, policy, or regulation adopted for the purpose of avoiding or mitigating an environmental effect?
Finding: Potentially Significant Impact
The Project is proposing to rezone parcels and establish AHO zones. The AHO zones would cover existing properties that are currently developed with non-residential land uses. The AHO zone is a new zone being proposed by the City to establish by-right development standards for affordable housing projects. The City is proposing to create development standards (i.e., criteria for building setbacks, parking, building height, landscaping, open space amenities, lot coverage, etc.) and architectural design guidelines for the AHO zone. The rezoning of parcels and establishment of a new overlay zone may cause a significant environmental impact due to a conflict with applicable land use plan, policy, or regulation adopted for the ~ □ □ □
~ □ □ □
IJ
City of Corona General Plan Housing Element Rezoning Program Update Project Initial Study
Environmental Setting, Analysis, and Mitigation Measures 3-50
purpose of avoiding or mitigation an environmental effect. Therefore, this impact will be further analyzed in the EIR.

IJ
City of Corona General Plan Housing Element Rezoning Program Update Project Initial Study
Environmental Setting, Analysis, and Mitigation Measures 3-51

3.12 MINERAL RESOURCES

MINERAL RESOURCES
Would the project:

Potentially
Significant
Impact
Less Than
Significant
with Mitigation
Incorporation
Less than
Significant
Impact
No
Impact
a) Result in the loss of availability of a known mineral resource that would be of value to the region and
the residents of the state?
b) Result in the loss of availability of a locallyimportant mineral resource recovery site delineated on a local general plan, specific plan, or
other land use plan?

3.12.1 Environmental Setting
Mining has been part of the City’s history since 1888, when the Temescal Rock Quarry was opened to furnish rocks for streets of Los Angeles and in nearby towns, and later decades saw oil and gas drilling in the Prado-Corona fields and Temescal Canyon. The City and the SOI are in the Temescal Valley Production Area (TVPA), an 820-square-mile area designated by the CGS and bounded by the Santa Ana Mountains on the west and the Perris Plateau to the east.

According to the City’s General Plan Update EIR, Temescal Valley is known for its mineral resource deposits, and portions of the City and its SOI are designated by the state as a “Construction Aggregate Resource Area”. These mineral resources generally consist of clay and construction aggregates, such as crushed rock, sand, and gravel.

As of 2017, the City has two active mining operations and the SOI has ten active mining operations. The City has been extensively mapped by the CGS and the City is primarily underlain by lands identified as Mineral Resource Zone (MRZ) -2 (City of Corona 2019). MRZ-2 lands are known to contain valuable mineral resources, specifically construction aggregate and industrial minerals. While much of that area has been developed, extensive resources still exist in the Gavilan Hills and in southwest Corona. A large portion of the aggregate resources have also been designated by the state as regionally significant.

3.12.2 Environmental Impact Analysis
a) Would the project result in the loss of availability of a known mineral resource that would be of value to the region and the residents of the state?
Finding: Less than Significant with Mitigation Incorporation General Plan Figure ER-8 identifies areas of the City by MRZs for industrial minerals, and Figure ER-9 identifies areas by MRZs for aggregate resources. All parcels identified for rezoning or the AHO zone are located in MRZ-4 for industrial minerals. A majority of the parcels are located in MRZ-3 areas for construction aggregate resources, and a small portion are located in areas identified as MRZ-2 for aggregate resources. MRZ-2 are areas where adequate information indicates that significant mineral □ ~ □ □
□ □ ~ □
IJ
City of Corona General Plan Housing Element Rezoning Program Update Project Initial Study
Environmental Setting, Analysis, and Mitigation Measures 3-52
deposits are present or where it is judged that a high likelihood for their presence exists. MRZ-3 are areas containing mineral deposits whose significance cannot be evaluated from available data. MRZ-4 are areas where available information is inadequate for assignment to any other zone; minerals may be present, but information is not available to make a determination. Additionally, a small portion of the of the proposed rezoning and AHO zone parcels are located in an area with classified aggregate resources as identified in General Plan Figure ER-10, which identifies areas of regional significance.

Parcels identified for rezoning and the AHO zone are located in areas that are highly urbanized and surrounded by existing developments. Parcels located within the area that are identified with classified aggregate resources are developed with existing uses. In the City, mineral resource use must have a Mineral Resource (MR) Overlay which requires discretionary permit approved by the City Council (City of Corona 2019). Parcels identified for the Project implementation do not have a MR overlay, and therefore, are not used for mineral resource purposes. Although future residential development resulting from Project implementation could lead to loss of known mineral resources, identified candidate parcels are developed with existing uses or are surrounded by urban development, and the likelihood that it would be converted for mineral resource uses is highly unlikely.

Though mineral resource uses at identified parcels are unlikely, it is located in areas identified as having known mineral resources that would be of value to the region and therefore, future residential development resulting from Project implementation could result in a significant impact. Future residential development resulting from Project implementation would be required to implement Mitigation Measures MIN-1 and MIN2, identified in the City’s General Plan Update EIR. Mitigation Measures MIN-1 and MIN-2 would require an evaluation of mineral resources prior to development activity. Implementation of mitigation measures identified in the General Plan Update EIR would lessen impacts to mineral resources of significance.

Therefore, since the identified parcels are not designated for mineral resource uses and the Project would require mineral resource evaluations prior to project approval, as required by General Plan Update EIR Mitigation Measure MIN-1 and MIN-2, the Project would have a less than significant impact on mineral resources with mitigation incorporation. As such, this topic does not require further evaluation in an EIR.

Mitigation Measure MIN-1: Prior to project approval for proposed development of properties classified as either regionally significant construction aggregate MRZ-2 or industrial minerals MRZ-2a, a mineral resource evaluation shall be conducted to determine the significant and economic viability of mining the resource. If development of a property would preclude future extraction of a significant mineral resource, in accordance with CEQA, the City shall make the appropriate findings and adopt a Statement of Overriding Considerations prior to permitting development of the property.

Mitigation Measure MIN-2: Prior to approval of any project on lands classified as either regionally significant construction aggregate MRZ-2 or industrial mineral MRZ-2a, a report shall be prepared that analyzes the project’s value in relation to the mineral values found onsite. The analysis shall consider the importance of construction aggregate mineral resource onsite to the market region as a whole, and not just the importance of the resources found within the City and SOI. The report shall be submitted to the City, such that the City has adequate information to develop a statement of reasons for permitting the proposed land use to the California Department of Conservation, State Mining and Geology Board, for subsequent IJ
City of Corona General Plan Housing Element Rezoning Program Update Project Initial Study
Environmental Setting, Analysis, and Mitigation Measures 3-53
review, in accordance with SMARA, Article 2, Section 2762 and 2763 for areas designated of regional significance.
b) Would the project result in the loss of availability of a locally important mineral resource recovery site delineated on a local general plan, specific plan, or other land use plan? Finding: Less than Significant
There are two active mineral resource recovery sites within the City and ten additional ones located within the SOI. The two active mining operations in the City are All American Asphalt and Corona Quarry (CalMat/Vulcan), which are both located in eastern Corona, east of Interstate 15. Parcels identified for rezoning and AHO are not located at these mineral resource recovery sites and are not designated for mineral resource recovery uses. Therefore, Project implementation would not result in the loss of availability of a locally important mineral resource recovery site, and impacts would be less than significant. As such, this topic does not require further evaluation in an EIR.

IJ
City of Corona General Plan Housing Element Rezoning Program Update Project Initial Study
Environmental Setting, Analysis, and Mitigation Measures 3-54

3.13 NOISE
NOISE
Would the project result in:

Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporation
Less than
Significant
Impact
No
Impact
a) Generation of a substantial temporary or
permanent increase in ambient noise levels in the
vicinity of the project in excess of standards
established in the local general plan or noise
ordinance, or applicable standards of other
agencies?
b) Generation of excessive groundborne vibration or
groundborne noise levels.
c) For a project located within the vicinity of a private airstrip or an airport land use plan, or where such
a plan has not been adopted within two miles of a
public airport or public use airport, would the
project expose people residing or working in the
project area to excessive noise levels?

3.13.1 Environmental Setting
The City has set noise and vibration performance standards for noise sources in the City. Municipal Code Chapter 9.24, Loud and Unnecessary Noise, defines the qualitative standards used in determining a potential violation. Municipal Code Section 17.84.040, Noise, provides performance standards for two separate types of noise sources: transportation and stationary. Table 6 below shows the acceptable interior and exterior noise limits for various land uses. The exterior noise limits in the table are based on the land use compatibility guidelines in General Plan Update EIR Table 5.13-3.

Table 6: City Interior and Exterior Noise Standards
Land Use Categories Energy Average CNEL
Categories Uses Interior1 Exterior2
Residential
Single Family, Duplex, Multiple
Family 453 65
Mobile Home NA 654
Commercial
Industrial
Institutional
Hotel, Motel, Transient Lodging 45 655
Commercial Retail, Bank,
Restaurant 55 NA
Office Building, Research and
Development, Professional Offices,
City Office Building
50 NA
Amphitheatre, Concert Hall
Auditorium, Meeting Hall 45 NA
Gymnasium (Multipurpose) 50 NA
IZI □ □ □
IZI □ □ □
□ □ □ IZI
IJ
City of Corona General Plan Housing Element Rezoning Program Update Project Initial Study
Environmental Setting, Analysis, and Mitigation Measures 3-55
Land Use Categories Energy Average CNEL
Categories Uses Interior1 Exterior2
Sports Club 55 NA
Manufacturing, Warehousing,
Wholesale, Utilities 65 NA
Movie Theatres 45 NA
Institutional Hospitals, Schools’ classroom 45 65
Church, Library 45 NA
Open Space Parks NA 65
Notes:
1 Indoor environment excluding bathrooms, toilets, closets, corridors. 2 Outdoor environment limited to:
• Private yard of single family
• Multi-family private patio or balcony that is served by a means of exit from inside • Mobile home park
• Hospital patio
• Park’s picnic area
• School’s playground
• Hotel and motel recreation area
3 Noise level requirements with closed windows. Mechanical ventilating system or other means of natural ventilation shall be provided as of Chapter 12, Section 1205 of UBC.
4 Exterior noise level should be such that interior noise level will not exceed 45 community noise equivalent level (CNEL). 5 Except those areas affected by aircraft noise.

Source: City of Corona 2019
For the preparation of the General Plan Update EIR, the City conducted noise monitoring throughout the different locations in the City and measurements were made during weekday periods when it was expected to be most active. Long-term (24 hour) measurements were conducted at four locations within the City and short-term (15 minute) measurements were conducted at twelve locations around the City. According to the General Plan Update EIR, the noise environment within the City and SOI is highly variable, depending on the location. Freeway noise from Interstate 15 and SR 91 tend to control the noise environment at most locations and in general, noise monitoring locations that experiences less than 50 A-weighted decibel (dBA) equivalent continuous noise level (Leq) were located relatively far from these major freeway sources. The time-averaged sound level in the City was in the range of 45 to 65 dBA Leq.

IJ
City of Corona General Plan Housing Element Rezoning Program Update Project Initial Study
Environmental Setting, Analysis, and Mitigation Measures 3-56

3.13.2 Environmental Impact Analysis
a) Would the project result in generation of a substantial temporary or permanent increase in ambient noise levels in the vicinity of the project in excess of standards established in the local general plan or noise ordinance, or applicable standards of other agencies? Finding: Potentially Significant Impact
Construction and operation resulting from Project implementation could result in the generation of temporary and permanent increase in ambient noise levels in the vicinity of future development projects.

Future residential development resulting from Project implementation may result in a substantial increase in ambient noise in excess of City standards. Therefore, this potentially significant impact will be further analyzed in the EIR.
b) Would the project exposure of persons to or generation of excessive groundborne vibration or groundborne noise levels?
Finding: Potentially Significant Impact
Construction activities associated with development of the identified candidate Project sites would generate varying degrees of groundborne vibration and noise levels, depending on construction procedures and equipment. Construction and operation of the Project may result in exposure of persons to or generation of excessive groundborne vibration or groundborne noise levels. Therefore, this potentially significant impact will be further analyzed in the EIR.
c) For a project located within the vicinity of a private airstrip or an airport land use plan, or where such a plan has not been adopted within two miles of a public airport or public use airport, would the project expose people residing or working in the project area to excessive noise levels?
Finding: No Impact
The City is located within the airport land use plan for the Corona Municipal Airport. General Plan Update EIR Figure 5.13-3 shows the existing noise contours of the airport. As identified in the General Plan Update EIR, Corona Municipal Airport is not a substantial source of noise because the 65 dBA noise contour does not extend past the airport boundary (City of Corona 2019). Noise exposure areas of 55 dBA CNEL and above are largely within open space and industrial use areas immediately surrounding Corona Municipal Airport. The identified Project sites are not located within the designated noise contours for the airport, and therefore, they would not expose people residing or working in the Project area to excessive noise levels from airport uses. Therefore, the Project would have no impact. As such, this topic does not require further evaluation in an EIR.

IJ
City of Corona General Plan Housing Element Rezoning Program Update Project Initial Study
Environmental Setting, Analysis, and Mitigation Measures 3-57

3.14 POPULATION AND HOUSING

POPULATION AND HOUSING
Would the project:

Potentially
Significant
Impact
Less Than
Significant with
Mitigation
Incorporation
Less than
Significant
Impact
No
Impact
a) Induce substantial unplanned population growth
in an area, either directly (for example, by
proposing new homes and businesses) or
indirectly (for example, through extension of
roads or other infrastructure)?
b) Displace substantial numbers of existing people
or housing, necessitating the construction of
replacement housing elsewhere?

3.14.1 Environmental Setting
The City was incorporated in 1896, and by 1940, the population had grown to approximately 8,764 people.

By 1970, the population more than doubled to 27,519 people, and by 1980, it had increased to approximately 40,000 people. During the beginning of the 1980s, the City’s population grew significantly, as more land was converted to residential uses. Between 2010 and 2017, population trends slowed as the availability of vacant land in the City gradually decreased (City of Corona 2019). Table 7 below shows the population trends and percent change in the City’s population from 2005 to 2017.

The rate of housing growth in the City has varied over the years. Total number of housing units in the City in 2005 was approximately 48,369 housing units and grew by approximately four percent to 50,301 housing units by 2017 (City of Corona 2019). The General Plan Update EIR estimates that approximately 68 percent of the City’s housing stock in 2018 was single-family homes.

Table 7: City Population Trends
Year Population Percent Change
2005 162,410 N/A
2006 161,998 -0.25%
2007 156,394 -3.46 %
2008 173,119 10.69%
2009 151,015 -12.77%
2010 153,335 1.54%
2011 155,884 1.66%
2012 158,388 1.61%
2013 159,507 0.71%
2014 161,498 1.25%
2015 164,242 1.70%
□ □ ~ □
□ □ ~ □
IJ
City of Corona General Plan Housing Element Rezoning Program Update Project Initial Study
Environmental Setting, Analysis, and Mitigation Measures 3-58
2016 166,774 1.54%
2017 167,843 0.64%
Source: City of Corona General Plan Technical Update Draft EIR

3.14.2 Environmental Impact Analysis
a) Would the project induce substantial unplanned population growth in an area, either directly (for example, by proposing new homes and businesses) or indirectly (for example, through extension of roads or other infrastructure)?
Finding: Less than Significant Impact
The City is proposing a rezoning program to accommodate the planning of low- and moderate-income households. The City’s 2021-2029 Housing Element Update was adopted by the City Council on November 3, 2021. The Housing Element Update requires the City to plan for 2,792 low-income housing units and 1,096 moderate-income housing units, pursuant to the state’s RHNA allocation. The City’s total RHNA allocation is 6,088 units with 3,888 allocated to low- and moderate-income housing units. The City’s Housing Element Update includes an inventory of properties that are intended to be rezoned to high density residential or an AHO zone in order to plan for sites suitable for low- and moderate-income units.

The City’s RHNA allocation for the Housing Element Update exceeded the City’s housing unit projection for Year 2040 in the General Plan Update. The General Plan Update EIR anticipated an additional 5,494 housing units. Currently, the City’s RHNA allocation of 6,088 exceeds its projected housing growth by 594 units, in addition to accommodating a minimum buffer of four percent. These additional housing units from the RHNA were not known at the time the General Plan Update EIR was prepared. Therefore, supplemental environmental evaluation pursuant to CEQA is required to address the potential impacts from growth that could occur as a result of Project implementation.

Certification of the proposed Project itself would not result in direct unplanned population growth as the Project is proposing the rezoning and AHO zones for identified candidate parcels within the City and not the actual development of these sites. However, certification of the Project would lead to more parcels in the City being available for residential developments and could result in indirect impacts to population growth.

According to the City’s Housing Element Update, the City has an average household size of 3.32 (City of Corona 2021b). If all parcels identified for rezoning and AHO zones are developed with residential uses to provide an additional 594 residential units, it would result in a population growth of approximately 1,972 residents. The forecasted additional population (1,972 residents) and housing units (594 units) at buildout of the Project would result in a 1.07 percent increase in population and 1.1 percent increase in housing units over what was estimated at General Plan buildout.

The Project proposes to meet and exceed the RHNA for low- and moderate-income households, and when considering the additional buffer in the AHO zone, Project implementation could result in the development of up to 6,221 units. This would represent a very conservative surplus of approximately 2,415 units, IJ
City of Corona General Plan Housing Element Rezoning Program Update Project Initial Study
Environmental Setting, Analysis, and Mitigation Measures 3-59
assuming that every candidate parcel was developed at a density of 60 units per acre, which is unlikely.

The 594 units required to meet RHNA and the surplus provided by the buffer would represent in total, an increased population growth of approximately 9,990 residents, thereby resulting in a 5.4 percent population increase and a 5.6 percent increase in housing units over what was estimated at General Plan buildout.

Even with the buffer and accounting for the surplus units, Project implementation would be in compliance with General Plan and Housing Element policies to provide for balanced housing types and affordability levels and provide access to affordable housing to lower and moderate-income households. Additionally, the Project would ensure that the City is in compliance with the state’s RHNA allocation for the City.

Therefore, since Project implementation would result in a less than significant increase to the projected population and housing units within the City and would be in compliance with General Plan and Housing Element policies and the City’s RHNA allocation, Project implementation would result in less than significant impacts related to population growth. The rate of housing growth in the City has varied over the years. Total number of housing units in the City in 2005 was approximately 48,369 housing units and grew by approximately four percent to 50,301 housing units by 2017 (City of Corona 2019). The General Plan Update EIR estimates that approximately 68 percent of the City’s housing stock in 2018 was single-family homes. Therefore, impacts would be less than significant, and this topic does not require further evaluation in an EIR.
b) Would the project displace substantial numbers of existing people or housing, necessitating the construction of replacement housing elsewhere?
Finding: Less than Significant Impact
Candidate sites that are proposed for the AHO zone include a variety of uses on 100 parcels, including commercial, retail, industrial, surface parking, storage and vacant parcels. The proposed AHO zone will cover existing properties that are currently developed with non-residential land uses, sporadic residential land uses or are currently vacant. The establishment of the AHO zone is intended to encourage housing.

Existing residential inventory that could be affected by the AHO zone due to redevelopment would occur at a higher density and provide housing replacement opportunity. Therefore, the AHO zone would not displace existing people or housing.

There are 57 parcels considered as potential sites for proposed rezoning to a higher residential density, and these are primarily parcels that are currently used for residential uses, in addition to parking lots, mobile home parks and some commercial, institutional, and vacant parcels. Project implementation would result in changes to the zoning designations but would not require relocation of existing residential developments, as it would not lead to direct development of the identified sites. However, if the candidate Project sites are identified for new development or redevelopment on an individual basis, displacement of existing people or housing could occur. Development and redevelopment of the sites may result in displacement of existing people or housing if the identified site is currently developed with residential uses. However, the site would likely be developed or redeveloped with a higher density residential development and provide for more residential units compared to existing conditions. Therefore, any existing housing that would be demolished as a result of future residential development resulting from Project implementation would be replaced at a higher ratio of residential units. Therefore, Project implementation would not displace substantial numbers IJ
City of Corona General Plan Housing Element Rezoning Program Update Project Initial Study
Environmental Setting, Analysis, and Mitigation Measures 3-60
of existing people or housing, necessitating the construction of replacement housing elsewhere, and impacts would be less than significant. As such, this topic does not require further evaluation in an EIR.

IJ
City of Corona General Plan Housing Element Rezoning Program Update Project Initial Study
Environmental Setting, Analysis, and Mitigation Measures 3-61

3.15 PUBLIC SERVICES

PUBLIC SERVICES
Would the project:

Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporation
Less than
Significant
Impact
No
Impact
a) Result in substantial adverse physical impacts associated with the provision of new or physically altered governmental facilities, need for new or physically altered governmental facilities, the construction of which could cause significant environmental impacts, in order to maintain acceptable service ratios, response times, or other performance objectives for any of the public services:
i) Fire protection?
ii) Police protection?
iii) Schools?
iv) Parks?
v) Other Public Facilities?

3.15.1 Environmental Setting
Fire Protection
The CFD provides fire protection and emergency medical services in the City. The CFD also serves the communities of El Cerrito, Coronita, and Home Gardens through a service agreement with the County (City of Corona 2019). CFD headquarters are located at 735 Public Safety Way, with seven CFD fire stations located around the City. The CFD 2021 Annual Report identified that the department employed 93 firefighters, 10 fire prevention staff, one emergency management staff, three professional staff and 15 volunteers (CFD 2021). In 2021, the CFD responded to 14,927 total incidents with 90 percent of response times 7 minutes and 29 seconds or less and approximately 73 percent of response times hitting their target of 6 minutes or less. The parcels identified for rezoning and AHO zone as part of Project implementation are located within the fire response zones for CFD Fire Stations 1, 2 and 3 (City of Corona 2019).

Police Protection
The Corona Police Department (CPD) provides continuous police protection services to the City. CPD operates out of its headquarters at 730 Public Safety Way with several branches of offices situated throughout its service area, which is divided into four police patrol zones. The CPD 2021 Annual Report identified that in 2021, the department employed 162 sworn officers, 119 professional staff, and 60 volunteers. CPD has identified a target response time of five minutes and in 2021, of the 85,642 calls of service the department responded to, 90 percent of calls had a response time of 4 minutes and 41 seconds or less (CPD 2021).

Schools
The City’s school-aged population is served primarily by the Corona-Norco Unified School District (CNUSD) which includes K-12 education, alternative education, an adult education. Within the CNUSD, there are 34 □ □ ~ □
□ □ ~ □
□ □ ~ □ ~ □ □ □
□ □ ~ □
IJ
City of Corona General Plan Housing Element Rezoning Program Update Project Initial Study
Environmental Setting, Analysis, and Mitigation Measures 3-62
schools that serve more than 33,000 students in its jurisdiction. Additionally, the City has 14 private schools which include Montessori schools, alternative education, and religious schools. The City is also served by the Alvord Unified School District which serves portions of the eastern part of the City and its SOI (City of Corona 2019).

Parks
The City offers built and natural trails, developed parks, and golf courses as some of the recreational opportunities in the City. Corona has 35 public parks covering approximately 352 acres, which does not include natural open space areas such as Fresno Canyon and Sage Open Space. The public park system in the City includes mini, neighborhood, community, and major/regional arks that are differentiated by scale, population served, and amenities. The City’s Park standard is based on guidance provided by California Government Code Section 666477, referred to as the Quimby Act, and the City has a park standard of 3 acres per 1,000 residents.

Other Public Facilities – Libraries
The Corona Public Library is located at 605 South Main Street and is a 62,000-square-foot facility that has a total of 112,500 registered members. The Corona Public Library’s collection consists of 152,500 items which includes books, videos, CDs, CDROM software, audio cassettes, books on tape, and pamphlets (City of Corona 2019).

3.15.2 Environmental Impact Analysis
a) Would the project result in substantial adverse physical impacts associated with the provision of new or physically altered governmental facilities, need for new or physically altered governmental facilities, the construction of which could cause significant environmental impacts, in order to maintain acceptable service ratios, response times, or other performance objectives for any of the public services:
i. Fire Protection?
Finding: Less than Significant Impact
Project implementation would rezone and create an AHO zone for parcels within the City to provide residential units in excess of the amount planned for in the General Plan Update. These additional units would result in an increase in demand for fire services and facilities.

As identified in the General Plan Update EIR, fire vehicles, equipment, and expansion of existing facilities is funded partially through the payment of a Development Impact Fee (DIF) from new development, which is required under City Municipal Code Section 16.23.040. The City has also created a Community Facilities District to finance the costs of providing police, fire, and paramedic services to the City. Future development projects in the City are required to be reviewed by the City, CFD, and the Riverside County Fire Department to ensure compliance with requirements and standards set forth by the departments, prior to approval.

Future residential development resulting from Project implementation would be required to pay all required IJ
City of Corona General Plan Housing Element Rezoning Program Update Project Initial Study
Environmental Setting, Analysis, and Mitigation Measures 3-63
fees to offset impacts to fire protection services and facilities. The General Plan Update EIR identified that impacts to fire protection resulting from increase in demand would be less than significant with payment of the Development Impact Fee and the Community Facilities District fees.

Additionally, future residential development resulting from Project implementation would be required to comply with all applicable local, state and federal fire codes, buildings codes, and nationally recognized fire and safety standards. The Project would also be required to comply with applicable General Plan policies relating to fire and emergency services. Compliance with all applicable codes and standards, as well as compliance with applicable General Plan policies, would reduce the potential occurrence for fire emergencies at future project sites and reduce the demand for fire protection services. Therefore, with the payment of all required fees and compliance with regulations and standards set forth by the City and CFD, Project implementation would not result in the need for new or physically altered fire protection facilities, and impacts would be less than significant. As such, this topic does not require further evaluation in an EIR. ii. Police Services?
Finding: Less than Significant Impact
Project implementation would rezone and create an AHO zone for parcels within the City to provide residential units in excess of the amount planned for in the General Plan Update. These additional units would result in an increase in demand for police services and facilities.

Similar to fire services, funds for additional police facilities, equipment, and officers are provided through DIFs and collected from new residential, commercial, and industrial/manufacturing developments, as well as Community Facilities District fees. Therefore, future residential development resulting from Project implementation would be required to pay these fees to offset the increase in demand. Although the General Plan Update EIR identified that 50 percent of the population and job growth associated with General Plan buildout would occur within the SOI which is served by Riverside County Sheriff’s Department, the parcels identified for rezoning and AHO district are located within the City and would be served by CPD. The General Plan Update EIR identified that payment of DIFs would satisfy the additional demand for police services generated within the City from new developments. Additionally, future residential development resulting from Project implementation would be required to comply with General Plan policies related to ensuring the provision of adequate protection of police services. With the payment of applicable fees and compliance with applicable General Plan policies, Project implementation would not result in the need for new or physically altered police facilities, and impacts would be less than significant. As such, this topic does not require further evaluation in an EIR.
iii. Schools?
Finding: Less than Significant Impact
Project implementation would rezone and create an AHO zone for parcels within the City to provide residential units in excess of the amount planned for in the General Plan Update. These additional units would result in an increase in resident and student population and would increase demand on existing schools.

IJ
City of Corona General Plan Housing Element Rezoning Program Update Project Initial Study
Environmental Setting, Analysis, and Mitigation Measures 3-64
The General Plan Update EIR identified that CNUSD would have adequate capacity to serve the new students generated from General Plan buildout. The General Plan Update EIR identified that remaining capacity at CNUSD would be able to accommodate 8,596 elementary students, 1,911 middle school students, and 222 high school students (City of Corona 2019). Additionally, if and when CNUSD requires expansion and construction of new facilities to accommodate growth generated by new development, funding for new schools would be through the fee program pursuant to SB 50, as well as state and federal funding programs. Pursuant to Government Code Section 65996, payment of school fees is deemed to provide full and complete school facilities mitigation. Future residential development resulting from Project implementation would be required to comply with policies in the General Plan pertaining to ensuring adequate school services. Therefore, since there is capacity at CNUSD to serve new student populations, with the payment of required fees and incorporation of General Plan policies, the Project would not result in the need for new or physically altered police facilities, and impacts would be less than significant. As such, this topic does not require further evaluation in an EIR. iv. Parks?
Finding: Potentially Significant Impact
Project implementation could result of in the conversion of some designated open space areas to residential uses. The City’s park standard is based on the guidance provided by the Quimby Act, and the City has a park standard of 3 acres per 1,000 residents. As impacts on parks are population-driven and the Project proposes rezoning and establishment of AHO zones to accommodate more residential developments, Project implementation could result in substantial adverse physical impacts associated with the need for new or physically altered park facilities, the construction of which could cause significant environmental impacts, in order to maintain acceptable service ratios. As such, this potentially significant impact will be further analyzed in the EIR.
v. Other Public Facilities – Libraries?
Finding: Less than Significant Impact
Project implementation would rezone and create an AHO zone for parcels within the City to provide residential units in excess of the amount planned for in the General Plan Update. These additional units would result in an increase in demand on public facilities.

The General Plan Update EIR identified that although buildout of the General Plan would cause an increase in residents, it does not necessarily mean that there would be a significant demand for more library collection items or facility space. Project implementation would result in a greater increase in population than what was planned for in the General Plan, but it would not be expected to result in a more significant demand for library facilities than what was analyzed in the General Plan Update EIR. The General Plan Update EIR identified that payment of library facilities fees would ensure that adequate facilities and resources are continually available for the City’s growing population. The City uses DIFs from residential uses to fund library facilities within the City (City of Corona 2019). Additionally, future residential development resulting from Project implementation would be required to comply with General Plan policies IJ
City of Corona General Plan Housing Element Rezoning Program Update Project Initial Study
Environmental Setting, Analysis, and Mitigation Measures 3-65
that would ensure adequate library services are provided. Therefore, with the payment of development impact fees and compliance with General Plan policies, Project implementation would not result in the need for new or physically altered public facilities, and impacts would be less than significant. As such, this topic does not require further evaluation in an EIR.

IJ
City of Corona General Plan Housing Element Rezoning Program Update Project Initial Study
Environmental Setting, Analysis, and Mitigation Measures 3-66

3.16 RECREATION

RECREATION
Would the project:

Potentially
Significant
Impact
Less Than
Significant with
Mitigation
Incorporation
Less than
Significant
Impact
No
Impact
a) Increase the use of existing neighborhood and
regional parks or other recreational facilities such
that substantial physical deterioration of the facility would occur or be accelerated?
b) Include recreational facilities or require the
construction or expansion of recreational facilities
which might have an adverse physical effect on the
environment?

3.16.1 Environmental Setting
The location of the City near the convergence of three counties allows for residents to access natural open space areas including mountains, hillsides, canyons, and preserves (City of Corona 2019). The Prado Dam Basin, Chino Hills State Park, and Cleveland National Forest are recreational areas located within or near the City and provide recreational opportunities such as hiking, biking, equestrian uses, and camping. Sage Open Space and Fresno Canyon are local natural areas in the community that offer 67 acres of open space for walking, hiking, and bicycling. In addition to established open space areas, the City is part of the Riverside County MSHCP.

The City also offers built and natural trails, developed parks, and golf courses as additional recreational opportunities in the City. Corona has 35 public parks covering approximately 352 acres, not including natural open space areas such as Fresno Canyon and Sage Open Space. The public park system in the City includes mini, neighborhood, community, and major/regional parks that are differentiated by scale, population served, and amenities. The City’s park standard is based on the guidance provided by the Quimby Act, and the City has a park standard of 3 acres per 1,000 residents.

3.16.2 Environmental Impact Analysis
a) Would the project increase the use of existing neighborhood and regional parks or other recreational facilities such that substantial physical deterioration of the facility would occur or be accelerated?
Finding: Potentially Significant Impact
Project implementation could result of in the conversion of some designated open space areas to residential uses. As impacts on parks are population-driven and the Project proposes rezoning and establishment of AHO zones to accommodate more residential developments, future residential development resulting from Project implementation could result in the use of existing neighborhood and regional parks or other recreational facilities, such that substantial physical deterioration of the facility could occur or be accelerated. As such, this potentially significant impact will be further analyzed in the EIR.

IZI □ □ □
IZI □ □ □
IJ
City of Corona General Plan Housing Element Rezoning Program Update Project Initial Study
Environmental Setting, Analysis, and Mitigation Measures 3-67
b) Would the project include recreational facilities or require the construction or expansion of recreational facilities which might have an adverse physical effect on the environment? Finding: Potentially Significant Impact
Project implementation does not propose the development of recreational facilities; however, the increase in residential development which would result from the proposed rezoning and establishment of AHO zones to accommodate more residential developments could result in requiring the construction or expansion of recreational facilities which might have an adverse physical effect on the environment. Future residential development resulting from Project implementation could require the construction or expansion of recreational facilities to meet the service standards due to this increase in residential population. As such, this potentially significant impact will be further analyzed in the EIR.

IJ
City of Corona General Plan Housing Element Rezoning Program Update Project Initial Study
Environmental Setting, Analysis, and Mitigation Measures 3-68

3.17 TRANSPORTATION

TRANSPORTATION
Would the project:

Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporation
Less than
Significant
Impact
No
Impact
a) Conflict with a program plan, ordinance, or policy
addressing the circulation systems, including transit,
roadway, bicycle and pedestrian facilities?
b) Conflict with or be inconsistent with CEQA Guidelines Section 15064.3, subdivision (b)?
c) Substantially increase hazards due to a geometric
design feature (e.g., sharp curves or dangerous
intersection(s) or incompatible uses (e.g. farm
equipment))?
d) Result in inadequate emergency access?

3.17.1 Environmental Setting
SB 743 caused revisions to the CEQA Guidelines which established new criteria for determining the significance of transportation impacts, so that level of service or other similar measures of vehicular capacity or traffic congestion would not be the sole basis for determining significant impacts under CEQA. The revised CEQA Guidelines utilize the vehicle miles traveled (VMT) metric to evaluate the significance of transportation related impacts for development projects, land use plans, and transportation infrastructure projects. In accordance with SB 743, the City adopted its own thresholds for VMT in May 2019, which accounts for the complete length of the trip from the origin to the destination and assigns 100 percent of that trip distance to the City. The General Plan Update EIR modeled VMT per service population estimates for the City and SOI for home-based trips and employment trips for existing conditions (City of Corona 2019).

Regional and local access roads in Corona include Interstate 15, SR 91, SR 71, 6th Street, Main Street Magnolia Avenue, Ontario Avenue, Cajalco Road, River Road, McKinley Street, Grand Boulevard, Green River Road, Foothill Parkway, El Cerrito Road, Lincoln Avenue, and Hidden Valley Parkway. Riverside Transit Agency provides most of the available bus public transportation on the City and to its surrounding cities. MetroLink Provides commuter rail services via the 91 Line and the Inland Empire/Orange County Line, served by stations in West Corona and North Main Corona. Corona is also closely tied to the Orange County Transportation Authority for bus transit services, and paratransit services also provide alternative modes of flexible passenger transportation on undefined routes for those who need it. The City also adopted a Bicycle Master Plan which calls for bicycle lanes on various streets in order to increase the emphasis on active transportation, which classified bicycle facilities identified throughout the City. Pedestrian facilities exist throughout the City as well (City of Corona 2019). ~ □ □ □
~ □ □ □
□ □ ~ □
□ □ ~ □
IJ
City of Corona General Plan Housing Element Rezoning Program Update Project Initial Study
Environmental Setting, Analysis, and Mitigation Measures 3-69

3.17.2 Environmental Impact Analysis
a) Would the project conflict with a program plan, ordinance, or policy addressing the circulation systems, including transit, roadway, bicycle and pedestrian facilities? Finding: Potentially Significant Impact
Implementation of the Project would result in an increase in demand for public transit, bicycle, and pedestrian systems, which would require the improvement and expansion of the circulation system, in addition to what was evaluated in the General Plan Update EIR. As such, an evaluation of the policies addressing potential impacts to these facilities is required, and this potentially significant impact will be further analyzed in the EIR.
b) Would the project conflict with or be inconsistent with CEQA Guidelines Section 15064.3, subdivision (b)?
Finding: Potentially Significant Impact
Traffic generated by Project implementation in addition to General Plan buildout, plus the traffic generated by regional growth, would contribute to the existing congested conditions of Interstate 15 and SR 91, resulting on a conflict with the Riverside County Congestion Management Plan. As such, an evaluation of Project consistency with the City’s VMT thresholds is required, and this potentially significant impact will be further analyzed in the EIR.
c) Would the project substantially increase hazards to a geometric design feature (e.g., sharp curves or dangerous intersections) or incompatible uses (e.g., farm equipment)? Finding: Less than Significant Impact
As with the General Plan, Project implementation would result in the alteration and intensification of existing land uses in the City. Therefore, future residential development resulting from Project implementation would require individual evaluations of the roadway alignments, intersection geometrics, and traffic control features. Roadway improvements would be made in accordance with the City’s Circulation Plan and roadway design guidelines, as well as the Caltrans Roadway Design Manual, in addition to the General Plan Circulation Element policies pertaining to roadway design and improving the safety of all users of the transportation system. Therefore, with adherence to all applicable guidelines, policies and requirements related to roadway design, Project implementation would not substantially increase hazards due to a geometric design feature or incompatible use, and impacts would be less than significant. As such, this topic does not require further evaluation in an EIR.

IJ
City of Corona General Plan Housing Element Rezoning Program Update Project Initial Study
Environmental Setting, Analysis, and Mitigation Measures 3-70
d) Would the project result in inadequate emergency access? Finding: Less than Significant Impact
As stated above, Project implementation would result in the alteration and intensification of existing land uses in the City and potentially result in inadequate emergency access. As such, future residential development resulting from Project implementation would be subject to review and approval by the City’s Public Works Department to evaluate roadway alignments, intersection geometrics, and traffic control features, which would be made in accordance with the City’s Circulation Plan and all applicable local and state requirements related to emergency access and the safety of all users of the transportation system.

Therefore, with adherence to all applicable guidelines, policies and requirements related to roadway design and emergency access requirements, Project implementation would not result in inadequate emergency access, and impacts would be less than significant. As such, this topic does not require further evaluation in an EIR.

IJ
City of Corona General Plan Housing Element Rezoning Program Update Project Initial Study
Environmental Setting, Analysis, and Mitigation Measures 3-71

3.18 TRIBAL CULTURAL RESOURCES

TRIBAL CULTURAL RESOURCES
Would the project:

Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporation
Less than
Significant
Impact
No
Impact
a) Would the Project cause a substantial adverse change in the significance of a tribal cultural resource, defined in Public Resources Code section 21074 as either a site, feature, place, cultural landscape that is geographically defined in terms of the size and scope of the landscape, sacred place, or object with cultural value to a California Native American tribe, and that is:
i. Listed or eligible for listing in the California
Register of Historical Resources, or in a local
register of historical resources as defined in
Public Resources Code section 5020.1(k), or
ii. A resource determined by the lead agency, in
its discretion and supported by substantial
evidence, to be significant pursuant to criteria
set forth in subdivision of Public Resources
Code Section 5024.1. In applying the criteria
set forth in subdivision of Public Resource
Code Section 5024.1, the lead agency shall
consider the significance of the resource to a
California Native American tribe?

3.18.1 Environmental Setting
Traditional models of California’s prehistory hypothesize that the coastline was populated by Native Americans from the interior of North America during the end of the last Ice Age. The Takic or Numic Tradition is present mainly in the Los Angeles, Orange, and western Riverside Counties region. In Los Angeles, Orange, and western Riverside Counties, changes in material culture, burial practices, and subsistence focus at the beginning of the Late Prehistoric period are considered the result of a Takic migration to the coast from inland desert regions. Modern Gabrielino, Juaneño, and Luiseño in this region are considered the descendants of the prehistoric Uto-Aztecan, Takic-speaking populations that settled along the California coast during this period, or perhaps somewhat earlier (City of Corona 2019).

The City is located within the territory of the Gabrielino Native American group. Surrounding native groups include the Chumash and Tatataviam/Alliklik to the north, the Serrano to the east, and the Luiseño/Juaneño to the south. The Gabrielino group established large, permeant villages in the fertile lowlands along rivers and streams and in sheltered areas along the coast, stretching from the foothills of the San Gabriel Mountains to the Pacific Ocean (City of Corona 2019). The City is located northwest of the border of the traditional Juaneño territory which was surrounded by the Luiseño to the south, the Gabrielino to the north, and the Cahuilla to the west. The Juaneño resided in permanent, well-defined villages and associated seasonal camps (City of Corona 2019). The City is also situated southwest of the traditional Cahuilla territory, which encompasses a large area and was bordered by 11 other Native American groups. Evidence suggests that the Cahuilla migrated to southern California approximately 2,000 to 3,000 years ago, most likely from the southern Sierra Nevada ranges of east-central California with other related Takic-speaking groups. The Cahuilla settled in a territory that extended west to east from the present-day City of Riverside ~ □ □ □
~ □ □ □
IJ
City of Corona General Plan Housing Element Rezoning Program Update Project Initial Study
Environmental Setting, Analysis, and Mitigation Measures 3-72
to the center portion of the Salton Sea in the Colorado Desert, and south to north from the San Jacinto Valley to the San Bernardino Mountains (City of Corona 2019).

The closest ethnographically documented village to the General Plan area is known as Paxangna. Some researchers state the village was located along the Temescal Creek, while others state the village was farther south (City of Corona 2019).

3.18.2 Environmental Impact Analysis
a) Would the Project cause a substantial adverse change in the significance of a tribal cultural resource, defined in Public Resources Code section 21074 as either a site, feature, place, cultural landscape that is geographically defined in terms of the size and scope of the landscape, sacred place, or object with cultural value to a California Native American tribe, and that is:
i. Listed or eligible for listing in the CRHR, or in a local register of historical resources as defined in Public Resources Code section 5020.1(k), or
ii. A resource determined by the lead agency, in its discretion and supported by substantial evidence, to be significant pursuant to criteria set forth in subdivision of Public Resources Code Section 5024.1. In applying the criteria set forth in subdivision of Public Resource Code Section 5024.1, the lead agency shall consider the significance of the resource to a California Native American tribe?
Finding: Potentially Significant Impact
The City, as the CEQA Lead Agency, will consult with appropriate tribes with the potential for interest in the region. Based on this consultation, it will be identified if the proposed Project site is located in an area having the potential for tribal cultural resources. SB 18 states: “Prior to the adoption or any amendment of a general plan or specific plan, a local government must notify the appropriate tribes (on the contact list maintained by the NAHC) of the opportunity to conduct consultations for the purpose of preserving, or mitigating impacts to, cultural places located on land within the local government’s jurisdiction that is affected by the proposed plan adoption or amendment. Tribes have 90 days from the date on which they receive notification to request consultation, unless a shorter timeframe has been agreed to by the tribe.” In accordance with Assembly Bill (AB) 52 and SB 18, the City provided notice to the appropriate Native American Tribes on June 7, 2022, inviting them to participate and consult with the City through its AB 52 and SB 18 Native American outreach efforts. The results of the outreach and consultation effort will be described in the EIR.

IJ
City of Corona General Plan Housing Element Rezoning Program Update Project Initial Study
Environmental Setting, Analysis, and Mitigation Measures 3-73

3.19 UTILITIES AND SERVICE SYSTEMS

UTILITIES AND SERVICE SYSTEMS
Would the project:

Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporation
Less than
Significant
Impact
No
Impact
a) Require or result in the relocation or construction of new or expanded water, wastewater treatment, or
stormwater drainage, electric power, natural gas, or
telecommunications facilities, the construction or
relocation of which could cause significant
environmental effects?
b) Have sufficient water supply available to serve the
project and reasonably foreseeable future development
during normal, dry and multiple dry years?
c) Result in a determination by the wastewater treatment provider which serves or may serve the project that is
has adequate capacity to serve the project’s projected
demand in addition to the provider’s existing
commitments?
d) Generate solid waste in excess of State or local
standards, or in excess of the capacity of local
infrastructure, or otherwise impair the attainment of
solid waste reduction goals?
e) Comply with federal, state, and local management and reduction statutes and regulations related to solid
waste?

3.19.1 Environmental Setting
The City’s current population is served by existing utility and service systems, as described below.

Wastewater
The Corona Utilities Department is the primary provider of sewer and sanitation services to the City. Corona Utilities services approximately 168,000 people over its 38.5-square-mile service area. The City sewer system is comprised of 13 sewer lift stations and associated force mains, three water reclamation facilities (WRF), and a network of gravity sewer pipes (City of Corona 2019). The Home Gardens Sanitary District (HGSD) services the unincorporated areas of Home Gardens, located in the City’s SOI and the Temescal Valley Water District (TVWD) provides sewer services to the Temescal Canyon area. The El Cerrito area is currently on septic systems.

The City’s three WRFs treat up to 15.5 million gallons per day (mgd). Additionally, the City has a capacity of 2.62 mgd at the Western Riverside County Regional Wastewater Authority (WRCRWA) Plant. The current treatment capacity of the City’s existing WRF is 15.5 mgd and 2.62 mgd at WRCRWA for a total of

18.12 mgd with plans to expand the wastewater treatment capacity at the City’s WRF to 18 mgd in the future. The WRCRWA operates a WRF for Home Gardens and the Temescal Valley Water District □ □ IZI □
□ □ IZI □
□ □ IZI □
□ □ IZI □
□ □ IZI □
IJ
City of Corona General Plan Housing Element Rezoning Program Update Project Initial Study
Environmental Setting, Analysis, and Mitigation Measures 3-74
maintains a WRF for its service area (City of Corona 2020). According to the General Plan Update EIR, the City has an average daily sewer flow of 15.3 mgd and the SOI has an average daily sewer flow of 3.3 mgd.

Electric Power
The SCE provides electrical services to most of the City and its SOI, using numerous power plants throughout California and in other western states. As of 2017, ten substations serve Corona and the SOI, of which eight are owned and operated by SCE. Additional substations are proposed in Corona and, if approved by the California Public Utility Commission, would provide additional service capacity in the future.

Most major electricity transmission lines are also maintained by SCE (City of Corona 2019).

On April 4, 2001, the Corona’s City Council passed Resolution No. 2001-25, which established a municipally owned electric utility. In August 2001, this electric utility, which is part of the Corona Utilities, entered into an agreement with SCE to provide retail services as an electric services provider. Corona Utilities buys and sells power on behalf of the City’s municipal electric accounts and properties within specific service areas. Total estimated existing electricity demand in the City and SOI in 2018, based on data provided by SCE and Corona Utilities, is estimated at 1,412,642,823 kWh per year (City of Corona 2019).

Solid Waste
The City contracts with Waste Management Inc. (WMI) for trash and recycling services. The General Plan Update EIR identified that in 2018, approximately 98 percent of solid waste from the City was transported to the El Sobrante landfill, located east of the City in an unincorporated area of the County, and the Olinda Alpha landfill, located in the City of Brea (City of Corona 2019). In 2020, the City had a total landfill disposal quantity of 275,556 tons (CalRecycle 2020).

Water
There are four water districts providers that serve the City and SOI. Corona Utilities provides water services to the majority of the City except for a small portion in eastern Corona that is provided by Eagle Valley Mutual Water Company (EVMWC). The EVMWC, along with the Home Gardens County Water District (HGCWD) and the TVWD, provide water services to the City’s SOI. Corona Utilities is responsible for supplying potable water to the City and surrounding areas. This area includes approximately 39 square miles within the City’s municipal area and 35 square miles in the SOI.

The City receives water from two main sources: groundwater sources from basins managed by Corona Utilities and imported water from Western Municipal Water District (WMWD). According to the 2020 UWMP, the City’s primary sources of imported water are supplied through WMWD which consist of treated surface water, untreated surface water, and desalinated brackish groundwater. Groundwater used by the City are from two basins: the Temescal Basin and the Bedford-Coldwater Basin (City of Corona 2021a). According to the City’s General Plan Update EIR, the groundwater basins provide approximately 40 percent of the City’s water supply from 22 wells with a total capacity of 39,200 acre-feet (af) per year (35 mgd). The remaining 60 percent of the City’s water supply is imported from WMWD through the Lower Feeder Pipeline IJ
City of Corona General Plan Housing Element Rezoning Program Update Project Initial Study
Environmental Setting, Analysis, and Mitigation Measures 3-75
(raw Colorado River water) and Mills Pipeline Connection (treated State Project water). The total capacity of the imported water supply is 39,840 af per year (35.6 mgd).

Additionally, the City uses reclaimed water that services the irrigation needs of 26 City parks, 17 schools, and many City, commercial, industrial, and multi-family residential common area landscaping. The City’s reclaimed water system ties into the three wastewater treatment facilities and treats an average of 13.5 mgd (City of Corona 2019).

Stormwater Drainage
The City’s storm drain system is comprised of six main storm drain facilities: the Temescal Canyon Wash, Oak Street Channel, Main Street Channel, Arlington Channel, South Norco Storm Drain, and North Norco Storm Drain. The City’s storm drain system releases water into flood control channels, washes, Santa Ana River, and Prado Basin (City of Corona 2020).

Natural Gas Facilities
SoCalGas provides natural gas services to the City and the SOI. SoCalGas maintains transmission and distribution lines throughout the City and the SOI. The General Plan Update EIR identified existing natural gas demands in the City and SOI, based on data provided by SoCalGas, which are estimated at 43.9 million therms per year (City of Corona 2019).

Telecommunications Facilities
Telecommunications in the City are offered by multiple service providers and through different types of infrastructure systems. The City is responsible for oversight and approval authority for the siting and operation of transmission antennas and other facilities within the City but does not exercise control over the provision of telecommunications services (City of Corona 2020).

3.19.2 Environmental Impact Analysis
a) Would the project require or result in the relocation or construction of new or expanded water, wastewater treatment, or stormwater drainage, electrical power, natural gas, or telecommunications facilities, the construction or relocation of which could cause significant environmental effects?
Finding: Less than Significant Impact
As with buildout of the General Plan, Project implementation may result in the relocation and construction of new and expanded water, wastewater, stormwater drainage, natural gas, telecommunications, and electrical power facilities. The General Plan Update EIR indicated that potential impacts related to utilities and service systems from buildout of the General Plan, in the City and SOI, would be less than significant without the incorporation of mitigation measures. As discussed further below, impacts to water and wastewater treatment facilities would be less than significant with Project implementation.

IJ
City of Corona General Plan Housing Element Rezoning Program Update Project Initial Study
Environmental Setting, Analysis, and Mitigation Measures 3-76
With respect to stormwater drainage, the General Plan Infrastructure Element includes multiple policies related to stormwater runoff and conveyance systems. City Municipal Code Chapter 13.16, Storm Drains, provides guidance regarding prohibited wastewater discharges, and Chapter 13.27, Storm Water Management and Discharge Controls, prohibits illicit connections and discharges to the storm drain system.

In addition, the City’s 2003 Storm Drain Master Plan analyzes storm drain facilities within the City and identifies deficiencies or capital improvements needed, with the objective of meeting a minimum 10-year frequency storm event. The Storm Drain Master Plan identified a total of 137 areas with insufficient street capacity and 152 deficient storm drain segments. Since the 2003 Storm Drain Master Plan, improvements have been made to the storm drain system and ongoing monitoring occurs through the City Public Works Department (City 2019). As with buildout of the General Plan, Project implementation would require individual developments to be constructed in accordance with City requirements and an assessment of how a project could affect the existing storm drain systems and to determine appropriate storm drain improvements, as applicable. Required improvements to storm drain facilities would be funded by DIFs.

Therefore, with adherence to General Plan policies and adherence to all applicable regulations, future residential development resulting from Project implementation would not result in a significant impact with respect to stormwater drainage facilities.

With respect to electrical power, buildout of the General Plan would result in an increase in electrical power of approximately 32 percent over existing conditions (City of Corona 2019). However, coordination with Corona Utilities, compliance with General Plan policies related to the maintenance of utility facilities, continued improvement of electrical poles and undergrounding of wires, adherence to all applicable permitting requirements and regulations, and payment of DIFs by future residential development projects would ensure that impacts related to the additional residential uses resulting from Project implementation would continue to be less than significant.

Similarly for natural gas, buildout of the General Plan would result in an increase in electrical power of approximately three percent over existing conditions (City of Corona 2019). The addition of 594 more residential units, as proposed under Project implementation, would represent a small fraction of additional demand for natural gas as compared to the General Plan buildout. In addition, with Project implementation, future residential development projects would be required to comply with General Plan policies relates to utility infrastructure and improvements and pay DIFs, as appropriate, to ensure that the additional residential uses would not cause significant environmental effects. As such, Project implementation would not result in a significant impact with respect to natural gas facilities or infrastructure.

Telecommunications facilities in the City are not owned by the City but are owned and operated by multiple service providers. As with buildout of the General Plan, Project implementation would not result in a significant impact to telecommunications facilities, as each individual future developer would be required to contract with the respective telecommunications company and coordinate with the City to connect to such facilities, as required by applicable regulations and requirements. Therefore, Project implementation would not result in a significant impact to telecommunications facilities.

In conclusion, future residential development resulting from Project implementation would not require or result in the relocation or construction of new or expanded water, wastewater treatment, or stormwater drainage, electrical power, natural gas, or telecommunications facilities, the construction or relocation of IJ
City of Corona General Plan Housing Element Rezoning Program Update Project Initial Study
Environmental Setting, Analysis, and Mitigation Measures 3-77
which could cause significant environmental effects, and impacts would be less than significant. As such, this topic does not require further evaluation in an EIR. b) Would the project have sufficient water supply available to serve the project and reasonably foreseeable future development during normal, dry and multiple dry years? Finding: Less than Significant Impact
The General Plan Update EIR provided water demand estimates as a baseline for land uses in the City and SOI. Under existing conditions, the average daily water demand was estimated at 27.7 mgd for both the City and SOI, with the majority of the service area consisting of residential uses. These estimates were considered conservative over-estimates for land planning purposes only. The 2015 UWMP estimated that the City’s per capita water demand was 163 gallons per capita per day (gpcd), which is below the minimum water use reduction target of 213 gpcd.

Buildout of the General Plan was assumed to increase the City’s population by approximately 11,511 residential units and an additional 26,476,352 square feet of non-residential uses in the City and its SOI; however, no water supply deficiencies were anticipated, as the City confirmed that it would have adequate capacity to accommodate the forthcoming increase in water demand associated with General Plan implementation. The City’s 2005 Water Master Plan identified 19 water system improvement projects which would increase the City’s water system capacity and functionality to accommodate the anticipated growth (City of Corona 2019).

The General Plan Update EIR anticipated an additional 5,494 units in the City resulting from buildout of the General Plan, which would result in an increase in water demand of approximately 2,471,856 gallons per day (gpd) (or an 11 percent increase), as compared to existing conditions. This proposed increase in water demand could be served by existing water resources without the need for new or expanded entitlements.

Furthermore, the City is planning on increasing its use or recycled water and continue to receive its supply from TVWD, HGWCD and imported water from WMWD, which were considered to have adequate supply to meet the proposed increase in water demand at buildout of the General Plan (City of Corona 2019).

As the City’s RHNA allocation exceeds the projected housing growth by 594 units, and the additional 594 units resulting from the rezoning program would further increase demand for water. As discussed above, the additional 594 units would cause an increase in population of approximately 1,972 people. Using the water demand per capita rate of 163 gpcd, this would result in an increase in water demand of 321,436 gpd or approximately 11.5 percent. Based on the existing availability of 35 mgd of groundwater in the City, in addition to continued imported water supplies of 35.6 mgd, the increase of 321,436 gpd resulting from Project implementation would be served by existing water supplies.

The Project proposes to meet and exceed the RHNA for low- and moderate-income households, and when considering the maximum density allowed at 60 units per acre in the AHO zone, Project implementation could result in the development of up to 6,221 units. As discussed above, this would represent a very conservative surplus of approximately 2,415 units, assuming that every candidate parcel was developed at a density of 60 units per acre, which is unlikely. The 594 units required to meet RHNA and the surplus IJ
City of Corona General Plan Housing Element Rezoning Program Update Project Initial Study
Environmental Setting, Analysis, and Mitigation Measures 3-78
provided by the buffer based on the maximum density would represent in total, an increase population of 9,990 residents, resulting in an increased water demand of up to approximately 1.6 mgd. Even under this conservative estimate, water supplies would still be sufficient to serve future residential resulting from Project implementation.

Furthermore, future residential development resulting from implementation of the Project would be subject to City permits, fees, and applications to ensure that adequate water supply and infrastructure are available to serve each development. In addition, there are numerous General Plan policies that would be applicable to reduce potential water supply and distribution impacts which may result from Project implementation. As existing water suppliers would be able to serve increased water demands in the City and SOI, continued compliance with applicable regulations, planning requirements and the payment of DIFs to accommodate future expansions to infrastructure would be required, as necessary. As with buildout of the General Plan, there would be sufficient water supply available to serve future residential development resulting from Project implementation, in addition to reasonably foreseeable development. Therefore, impacts would be less than significant. As such, this topic does not require further evaluation in an EIR. c) Would the project result in a determination by the wastewater treatment provider which serves or may serve the project that is has adequate capacity to serve the project’s projected demand in addition to the provider’s existing commitments?
Finding: Less than Significant Impact
As stated in the General Plan Update EIR, buildout of the entire General Plan would involve the installation of new or expanded sewer laterals and mains in the City and its SOI. Total estimated sewer flows in the City would increase by 4,058,546 gpd, or approximately 12 percent, with full buildout of the General Plan assumed. Even with this increase in sewer flows compared to existing conditions, General Plan buildout would not exceed the projected future capacity of the City’s WRFs, which have a total future treatment capacity of 18 mgd and would still have the capacity to receive portions of the proposed increase in sewer flows from across the SOI (City of Corona 2019). Portions of the City and its SOI sewer flows to TVWD and WRCWTP would be able to receive some of the 2.2 mgd increase in flows, as they have capacities of 2.3 mgd and 14 mgd, respectively (City of Corona 2019). Implementation of the entire General Plan would not create any major deficiencies in sewer lines Citywide, as improvement of deficient lines would be funded through DIFs and individually required permits. No significant impacts to sewer facilities or their ability to provide service capacity were anticipated as a result of General Plan buildout.

The addition of 549 residential units including the buffer, as proposed under Project implementation, would increase the demand for wastewater treatment; however, based on the currently available wastewater treatment capacity remaining after buildout of the General Plan, future residential development projects resulting from Project implementation would still have sufficient wastewater service capacity available. In addition, future projects would require individual permits and applications, the payment of DIFs and adherence to all applicable regulations, thereby further reducing potential impacts to wastewater treatment capacity. The relatively small number of additional residences proposed under the Project would not significantly impact the existing and projected wastewater treatment provider capacity, as compared to the impact of General Plan buildout across the City and SOI. Therefore, Project implementation would not result IJ
City of Corona General Plan Housing Element Rezoning Program Update Project Initial Study
Environmental Setting, Analysis, and Mitigation Measures 3-79
in a determination by the wastewater treatment provider which serves or may serve the Project that it has adequate capacity to serve the Project’s projected demand in addition to the provider’s existing commitments, and impacts would be less than significant. As such, this topic does not require further evaluation in an EIR.
d) Would the project generate solid waste in excess of State or local standards, or in excess of the capacity of local infrastructure, or otherwise impair the attainment of solid waste reduction goals?
Finding: Less than Significant Impact
According to the General Plan Update EIR, solid waste from the City is disposed at two different landfills:
the Sobrante Landfill and the Olinda Alpha Landfill (City of Corona 2019). The Sobrante Landfill currently has a remaining capacity of 143,977,170 cubic yards and the Olinda Alpha Landfill has a remaining capacity of 17,500,000 cubic yards (CalRecycle 2022a, 2022b). Therefore, the two landfills have a total remaining capacity of 161,477,170 cubic yards. The estimated closing dates of the landfills are 2051 and 2036. There would be adequate landfill capacity in the region for solid waste that would be generated by the future residential uses associated with Project implementation. The Project would be required to implement General Plan policies identified to reduce the amount of solid waste that is disposed in landfills. Additionally, new development projects approved by the City are required to contain storage areas for recyclable materials in conformance with PRC Section 42900 et seq., and the City’s Municipal Code Chapter 8.20, Collection of Refuse and Recyclable Materials. The City’s solid waste diversion programs would continue to operate and would have adequate capacity to accept all future wastes and recyclables to reduce landfill waste. Therefore, with implementation of the City’s waste reduction programs and General Plan policies, future residential development resulting from Project implementation would not generate solid waste in excess of standards or capacity of infrastructures and impacts would be less than significant. As such, this topic does not require further evaluation in an EIR.
e) Would the project comply with federal, state, and local management and reduction statutes and regulations related to solid waste?
Finding: Less than Significant Impact
Exiting regulations related to solid waste include AB 939 California Integrated Waste Management Act, AB 341, AB 1327 California Solid Waste Reuse and Recycling Act of 1991, California Green Buildings Standards Code, and the City’s Municipal Code Chapter 8.20, Collection of Refuse and Recyclable Materials. The Project would be required to adhere to all relevant existing statues and regulations related to solid waste, including waste diversion and reduction measures adopted by the City. Implementation of General Plan policies would ensure that new developments are constructed and operated in accordance with solid waste statues and regulations, and therefore, impacts associated with future residential development resulting from Project implementation would be less than significant. As such, this topic does not require further evaluation in an EIR.

IJ
City of Corona General Plan Housing Element Rezoning Program Update Project Initial Study
Environmental Setting, Analysis, and Mitigation Measures 3-80

3.20 WILDFIRE

WILDFIRE
Would the project:

Potentially
Significant
Impact
Less Than
Significant
with Mitigation
Incorporation
Less than
Significant
Impact
No
Impact
If located in or near state responsibility areas or lands classified as very high fire hazard severity zones; a) Substantially impair an adopted emergency response
plan or emergency evacuation plan?
b) Due to slope, prevailing winds, and other factors,
exacerbate wildfire risks, and thereby expose project
occupants to pollutant concentrations from a wildfire or the uncontrolled spread of a wildfire?
c) Require the installation or maintenance of associated infrastructure (such as roads, fuel breaks, emergency
water sources, power lines, or other utilities) that may exacerbate fire risk or that may result in temporary or ongoing impacts to the environment?
d) Expose people or structures to significant risks,
including downslope or downstream flooding or
landslides, as a result of runoff, post-fire slope
instability, or drainage changes?

3.20.1 Environmental Setting
The City of Corona is surrounded by extensive open space areas that are susceptible to wildfire and encroachment into the community. Vegetation to the north, in the Chino and Corona Hills, and to the east, in Gavilan Hills, is susceptible to wildfire. A majority of the undeveloped area surrounding the City is designated as a Very High Fire Hazard Severity Zone by CAL FIRE.

Though the majority of the area surrounding the City is designated as a VHFHSZ, the City is not designated as a VHFHSZ and is designated as a local responsible non-VHFHSZ (CAL FIRE 2009). Additionally, USFS classifies a majority of the City as non-burnable, with some areas ranging from low to moderate wildfire hazard potential with high and very high wildfire hazard potential areas located along the undeveloped area surrounding the City (USFS 2020).

3.20.2 Environmental Impact Analysis
a) Would the project substantially impair an adopted emergency response plan or emergency evacuation plan?
Finding: No Impact
The City has prepared an EOP and a LHMP to ensure protection of City residents in times of emergency and to identify local hazards and provide measures to address these hazards. The General Plan Update EIR identified that buildout of the General Plan would not result in substantial changes to the circulation patterns or emergency access routes identified in the LHMP and EOP. The Project would rezone parcels □ □ □ IZI
□ □ □ IZI
□ □ □ IZI
□ □ □ IZI
IJ
City of Corona General Plan Housing Element Rezoning Program Update Project Initial Study
Environmental Setting, Analysis, and Mitigation Measures 3-81
within the City that already exist and are located in developed areas of the City, and therefore, would not result in changes to the circulation patterns and emergency routes. Future residential development projects resulting from Project implementation would be required to comply with applicable fire and building codes and would be required to be reviewed by CFD prior to approval. Additionally, future projects would be required to comply with policies identified in the General Plan to ensure effective emergency response.

Compliance with General Plan policies, applicable fire and building codes, and the City’s EOP and LHMP would ensure that Project implementation would not substantially impair an adopted emergency response plan or evacuation plan, and there would be no impact. As such, this topic does not require further evaluation in an EIR.
b) Would the project due to slope, prevailing winds, and other factors, exacerbate wildfire risks, and thereby expose project occupants to pollutant concentrations from a wildfire or the uncontrolled spread of a wildfire?
c) Would the project require the installation or maintenance of associated infrastructure (such as roads, fuel breaks, emergency water sources, power lines, or other utilities) that may exacerbate fire risk or that may result in temporary or ongoing impacts to the environment? d) Would the project expose people or structures to significant risks, including downslope or downstream flooding or landslides, as a result of runoff, post-fire slope instability, or drainage changes?
b-d) Finding: No Impact
The Project is proposing rezoning and establishment of AHO zone of identified parcels within the City to provide residential housing units in excess of the amount planned in the General Plan Update. Parcels identified for rezoning and AHO zone are located in the central portion of the City and are not located in hillside areas or areas with an urban-wildland interface. Project implementation would not place assets in the VHFHSZ, and future residential development would be located within urbanized areas of the City.

Future residential development resulting from Project implementation would be required to adhere to a wide range of state and local codes pertaining to fire protection and would be required to comply with CFD’s SPP. There are several SPPs, with each individual SPP tailored to the fire behavior associated with terrain, fuel, and fire infrastructure needed to address wildfire risk unique to these areas. Adherence to the measures in the individual SPPs for areas relevant to future residential development projects would minimize impacts resulting from Project implementation to the extent possible and would ensure that new developments would not exacerbate fire hazards and would not expose people or structures to significant risks associated with post-fire landslides, mudflows, and flooding. Therefore, with implementation of applicable state and local codes and adherence to the SPP, future residential development resulting from Project implementation would not exacerbate fire risks or expose people or structures to significant risks, and there would be no impact.

Project implementation would result in the parcels being converted for additional housing and would result in construction and installation of associated infrastructure to accommodate new development. Associated infrastructure would be constructed in accordance with City requirements and regulations and would be IJ
City of Corona General Plan Housing Element Rezoning Program Update Project Initial Study
Environmental Setting, Analysis, and Mitigation Measures 3-82
required to adhere to the measures in the individual SPPs for new infrastructure to minimize potential impacts. Additionally, future residential development resulting from Project implementation would be required to implement General Plan policies identified to minimize risk from wildfire hazards. With adherence to applicable building practices and requirements, infrastructure associated with Project implementation would not exacerbate fire risk, and there would be no impact. As such, this topic does not require further evaluation in an EIR.

IJ
City of Corona General Plan Housing Element Rezoning Program Update Project Initial Study
Environmental Setting, Analysis, and Mitigation Measures 3-83

3.21 MANDATORY FINDINGS OF SIGNIFICANCE

MANDATORY FINDINGS OF SIGNIFICANCE
Would the project:

Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporation
Less than
Significant
Impact
No
Impact
a) Have the potential to degrade the quality of the
environment, substantially reduce the habitat of a fish or wildlife species, cause a fish or wildlife population to drop below self-sustaining levels, threaten to eliminate a plant or animal community, reduce the number or restrict the
range of a rare or endangered plant or animal or eliminate important examples of the major periods of California
history or prehistory?
b) Have impacts that are individually limited, but cumulative considerable? (“Cumulative considerable” means that
the incremental effects of a Project are considerable
when viewed in connection with the effects of past
Projects, the effects of other current Projects, and the effects of probable future Projects)?
c) Have environmental effects which will cause substantial adverse effects on human beings, either directly or
indirectly?

3.21.1 Environmental Impact Analysis
a) Would the project have the potential to degrade the quality of the environment, substantially reduce the habitat of a fish or wildlife species, cause a fish or wildlife population to drop below self-sustaining levels, threaten to eliminate a plant or animal community, reduce the number or restrict the range of a rare or endangered plant or animal or eliminate important examples of the major periods of California history or prehistory?
Finding: Potentially Significant Impact
Project implementation would result in less than significant impacts with the incorporation of mitigation with respect to biological resources and cultural resources. However, as consultation pursuant to AB 52 has not yet been completed, impacts related to tribal cultural resources are potentially significant and will be analyzed further in the EIR.
b) Would the project have impacts that are individually limited, but cumulative considerable? (“Cumulative considerable” means that the incremental effects of a Project are considerable ~ □ □ □
~ □ □ □
~ □ □ □
IJ
City of Corona General Plan Housing Element Rezoning Program Update Project Initial Study
Environmental Setting, Analysis, and Mitigation Measures 3-84
when viewed in connection with the effects of past Projects, the effects of other current Projects, and the effects of probable future Projects)? Finding: Potentially Significant Impact
The proposed Project, in conjunction with other past, present, and reasonably foreseeable future related projects, has the potential to result in significant cumulative impacts when the independent impacts of the proposed Project and the impacts of related projects combine to create impacts greater than those of the proposed Project alone.

A list of the related projects or growth projections will be developed for the EIR. The potential for the proposed Project in conjunction with the related projects and their cumulative contributions to environmental impacts will be evaluated in the EIR.

The cumulative impacts addressed in the EIR will be the same as the individual resource areas which will be evaluated in the EIR, which will include the following:
• Air Quality
• Energy
• Greenhouse Gas Emissions
• Land Use
• Noise
• Public Services (Parks)
• Recreation
• Transportation
• Tribal Cultural Resources
The extent and significance of potential cumulative impacts resulting from the combined effects of the proposed Project plus other past, present and reasonably foreseeable future projects will be evaluated in the EIR.

The proposed Project would not result in a cumulatively considerable contribution or result in a less than cumulatively considerable contribution to the environmental resource areas to the following topics, which will not be further evaluated in the EIR:
• Aesthetics
• Agriculture and Forestry Resources
• Biological Resources
• Cultural Resources
• Geology and Soils
• Hazards and Hazardous Materials
• Hydrology and Drainage
• Mineral Resources
• Population and Housing
• Public Services (Fire, Police, Schools
and Libraries)
• Utilities and Service Systems
• Wildfire
IJ
City of Corona General Plan Housing Element Rezoning Program Update Project Initial Study
Environmental Setting, Analysis, and Mitigation Measures 3-85
c) Would the project have environmental effects which will cause substantial adverse effects on human beings, either directly or indirectly?
Finding: Potentially Significant Impact
Potentially significant impacts to the following resources may have the potential to cause substantial adverse effects on human beings:
• Air Quality
• Energy
• Greenhouse Gas Emissions
• Land Use
• Noise
• Public Services (Parks)
• Recreation
• Transportation
• Tribal Cultural Resources
Potential impacts to each of these resources will be analyzed further in the EIR.

IJ
City of Corona General Plan Housing Element Rezoning Program Update Project Initial Study
Report Preparation
4-1

4.0 REPORT PREPARATION

4.1 LIST OF PREPARERS
Preparers
Trevor Macenski Senior Principal
Anna Radonich Principal Planner
Christine Abraham Principal Environmental Planner
Jennifer Webster Environmental Planner
Kaela Johnson Environmental Planner
IJ
City of Corona General Plan Housing Element Rezoning Program Update Project Initial Study
References
5-1

5.0 REFERENCES
California Department of Conservation (DOC). 2016. Farmland Mapping and Monitoring System, California Important Farmland Finder. https://maps.conservation.ca.gov/dlrp/ciff/. Accessed May 2022.

California Department of Forestry and Fire Protection (CAL FIRE). 2009. Corona – Very High Fire Hazard Severity Zones in LRA. https://osfm.fire.ca.gov/media/5911/corona.pdf. Accessed May 2022.

California Department of Resources Recycling and Recovery. 2020. Disposal Rate Calculator – Corona 2020. https://www2.calrecycle.ca.gov/LGCentral/AnnualReporting/DisposalRateCalculator.

Accessed May 2022.

California Department of Resources Recycling and Recovery. 2022a. SWIS Facility/Site Activity Details.

El Sobrante Landfill.
https://www2.calrecycle.ca.gov/SolidWaste/SiteActivity/Details/2280?siteID=2402. Accessed June 2022.

California Department of Resources Recycling and Recovery (CalRecycle). 2022b. SWIS Facility/Site Activity Details. Olinda Alpha Landfill.
https://www2.calrecycle.ca.gov/SolidWaste/SiteActivity/Details/2757?siteID=2093. Accessed June 2022.

California Department of Transportation (Caltrans). Scenic Highway, State Scenic Highway Map. https://dot.ca.gov/programs/design/lap-landscape-architecture-and-community-livability/lap-liv-iscenic-highways. Accessed June 2022.

California Geologic Survey (CGS). 2021. California Earthquake Hazards Zone Application, Earthquake Zones of Required Investigation. https://maps.conservation.ca.gov/cgs/EQZApp/app/. Accessed May 2022.

California State Water Resources Control Board. Geotracker. https://geotracker.waterboards.ca.gov/.

Accessed June 2022.

City of Corona. 2019. Corona General Plan Technical Update for the City of Corona, Draft Environmental Impact Report.
https://www.coronaca.gov/home/showpublisheddocument/17290/637122799157100000.

Accessed May 2022.

City of Corona. 2020. City of Corona 2020 – 2040 General Plan. https://www.coronaca.gov/home/showpublisheddocument/17292/637396648435970000.

Accessed May 2022.

IJ
City of Corona General Plan Housing Element Rezoning Program Update Project Initial Study
References
5-2
City of Corona. 2021a. 2020 Urban Water Management Plan. https://www.coronaca.gov/home/showpublisheddocument/20292/637612402713400000.

Accessed May 2022.

City of Corona. 2021b. City of Corona General Plan, Housing Element 2021-2029. https://www.coronaca.gov/home/showpublisheddocument/21174/637707501610300000.

Accessed May 2022.

Corona Fire Department (CFD). 2021. 2021 Annual Report. https://www.coronaca.gov/home/showpublisheddocument/21776/637841661637200000.

Accessed May 2022.

Corona Police Department (CPD). 2021. 2021 Annual Report. https://www.coronaca.gov/home/showpublisheddocument/21772/637846757873130000.

Accessed May 2022.

United States Forest Service (USFS). 2020. Wildlife Hazard Potential, Version 2020 Classified. https://usfs.maps.arcgis.com/home/webmap/viewer.html?useExisting=1&layers=55226e8547f84a ae8965210a9801c357. Accessed May 2022.

IJ
NOP – Corona General Plan Housing Element Rezoning Program Update SEIR

Page 1 of 5 ends

June 29, 2022

CITY OF CORONA

NOTICE OF PREPARATION
Notice of Preparation (NOP) of a Draft Supplemental Environmental Impact Report for the City of Corona General Plan Housing Element Update Rezoning Program TO: Reviewing Agencies and Other Interested Parties
FROM: City of Corona, Lead Agency
PROJECT TITLE: City of Corona General Plan Housing Element Rezoning Program Update APPLICANT: City of Corona
PUBLIC COMMENT PERIOD: July 1, 2022 through August 1, 2022 The purpose of the NOP is to notify reviewing agencies, including Responsible and Trustee Agencies that the City of Corona, as the Lead Agency will be preparing a Draft Supplemental Environmental Impact Report (SEIR) for the City of Corona General Plan Housing Element Rezoning Program Update for the City’s adopted 2021-2029 Housing Element Update.

The City is requesting comments on the scope and content of the Supplemental EIR from Responsible and Trustee agencies, interested public agencies, organizations and the general public pursuant to State of California Environmental Quality Act (CEQA) Guidelines §15082. The City will need to know the views of your agency as to the scope and content of the environmental information, which is germane to your agency’s statutory responsibilities in connection with the proposed Project. The project description, location, and the probable environmental effects are contained in the Initial Study, which can be accessed at www.CoronaCA.gov/GPUpdate.

Scoping Meeting: As part of the notice of preparation process, the City will hold a public scoping meeting on the future preparation of the Supplemental EIR to the General Plan EIR to receive public comments and suggestions on information that should be included in the environmental analysis for the Project as it relates to the California Environmental Quality Act. The public scoping meeting will be held on July 20, 2022, from 5:00 p.m. to 6:00 p.m. at Corona City Hall, Multi-Purpose Room at 400 S. Vicentia Avenue, Corona, CA 92882.

Public comments can also be submitted in writing and emailed to [email protected] or mailed to CITY OF CORONA, CITY HALL, Planning and Development Department, 400 South Vicentia Avenue Corona, California 92882.

Project Location: The Project is located in the City of Corona (Corona), which is in northwestern Riverside County (County). The City is generally bordered by the City of Norco and the City of Riverside to the north and northeast, the City of Chino Hills and the City of Yorba Linda to the northwest, the City of Anaheim to the west, the Cleveland National Forest and the Santa Ana Mountains to the southwest, and NOP – Corona General Plan Housing Element Rezoning Program Update SEIR

Page 2 of 5 ends

June 29, 2022
unincorporated Riverside County along the remaining City borders, as shown in Figure 1. The Project is interspersed throughout the City, which has a land area of approximately 40 square miles, as shown in Figure 2. The Project would affect specific parcels within the City, by proposing to rezone parcels to accommodate high density residential uses or an Affordable Housing Overlay (AHO) zone in order to plan for additional affordable housing units.

Project Description: The City’s 2021-2029 Draft Housing Element Update was adopted by the City Council on November 3, 2021 and has been reviewed by the California Department of Housing and Community Development (HCD). The City is continuing to work with HCD on obtaining Housing Element compliance.

The General Plan Update EIR certified on June 30, 2020, anticipated an additional 5,494 residential units; however, the State’s Regional Housing Needs Assessment (RHNA) allocation for the Housing Element Update now exceeds the City’s housing unit projection for Year 2040 in the General Plan Update. The City’s total RHNA allocation is 6,088 units with 3,888 allocated to low- and moderate-income housing units, consisting of 2,792 units and 1,096 units, respectively. Currently, the City’s RHNA allocation of 6,088 exceeds its projected housing growth by 594 units, in addition to accommodating an additional buffer.

As such, the City is now proposing a rezoning program to accommodate the planning of low- and moderateincome households as required by the state’s RHNA allocation for the City. These additional 594 housing units from the RHNA were not known at the time the General Plan Update EIR was prepared, potentially resulting in additional impacts that were not evaluated in the General Plan Update EIR. Therefore, supplemental environmental evaluation pursuant to CEQA is required to address the potential impacts from growth that could occur as a result of Project implementation.

The proposed Project is ultimately implementing the General Plan. As such, the General Plan Update EIR is incorporated by reference herein, as the evaluations of potential environmental impacts associated with adoption of the General Plan include mitigation measures and consistency evaluations which are directly applicable to the proposed Project.

The City’s Housing Element Update includes an inventory of properties that are intended to be rezoned to high density residential or an Affordable Housing Overlay (AHO) zone in order to plan for potential sites to accommodate the RHNA allocation of units that would also be suitable for low- and moderate-income units. The AHO zone is a new zone being proposed by the City to establish by-right development standards for affordable housing projects. The AHO zone will cover existing properties that are currently developed with non-residential land uses. The overlay zone will allow current uses to remain but would allow property owners the option to develop per the underlying General Plan and zoning or the AHO zone. The City is proposing to create development standards (i.e., criteria for building setbacks, parking, building height, landscaping, open space amenities, lot coverage, etc.) and architectural design guidelines for the AHO zone.

In addition to the RHNA allocation, a buffer is necessary to ensure that if one or more of the identified candidate sites are developed at lower densities or with non-housing uses, there would be remaining capacity to ensure an ongoing supply of sites for housing during the eight-year-cycle of the Housing Element. If there were no buffer provided, then the City could be obliged to identify new sites and amend the Housing Element if an identified site were developed with a non-housing project or developed at a density less than that anticipated in the Housing Element. The need for a substantial buffer is even more important during this cycle because of new rules in the Housing Accountability Act’s “no net loss” NOP – Corona General Plan Housing Element Rezoning Program Update SEIR

Page 3 of 5 ends

June 29, 2022
provisions. Senate Bill (SB) 166 (2017) requires that the land inventory and site identification programs in the Housing Element always include sufficient sites to accommodate the unmet RHNA.

Table 1 City of Corona RHNA Allocation & Sites Inventory Lower Income Moderate
Income
Above Moderate
Income
Total
RHNA Allocation 2,792 1,096 2,200 6,088
Planned and Approved Units 0 92 2,110 2,202
ADUs Anticipated for
Development
46 28 6 80
Remaining RHNA Units
Required After Credits
2,746 976 84 3,806
Vacant Units 164 24 562 750
Nonvacant Units 82 115 255 452
Potential Rezone 149 219 0 368
Affordable Housing Overlay
(60 du/ac maximum)
3,442 930 279 4,651
Total Units 3,837 1,288 1,096 6,221
Percent Buffer of Remaining
Needs after Credits

39.5% 32%
Total Unit Surplus 1,091 312 1,012 2,415
Anticipated approvals include, but are not limited to:
1) General Plan Amendment
2) Change of Zone
3) Amendment to Title 17, Zoning Code of the Corona Municipal Code 4) Amendment to various specific plans
5) Adoption of Design Guidelines
Public comments on the Initial Study are invited to be submitted in writing before August 1, 2022.

The document is available for review on the city’s website at www.CoronaCA.gov/GPUpdate. The document is also available at Corona City Hall in the Planning and Development Department. Comments should be sent to:

CITY OF CORONA, CITY HALL
Planning and Development Department
400 South Vicentia Avenue
Corona, California 92882-2187
Contact: Joanne Coletta, Director
Email: [email protected]
(951) 736-2434
NOP – Corona General Plan Housing Element Rezoning Program Update SEIR

Page 4 of 5 ends

June 29, 2022
Figure 1 Vicinity Map
()stanwc ............... ,,.,.

NOP – Corona General Plan Housing Element Rezoning Program Update SEIR

Page 5 of 5 ends

June 29, 2022
Figure 2 City of Corona Boundary and Sphere of Influence ::.-:.-:---··'"-•--·--·
()stanwc
Notice of Preparation 1 FORM “G”

NOTICE OF PREPARATION
TO:
☒ Reviewing Agencies, Interested Parties, and
Organizations
California Department of Planning and Research
Via Electronic Submittal
FROM: Name: City of Corona, Lead Agency
Address: 400 S. Vicentia Avenue
Suite 120
Corona, CA 92882
Telephone: (951) 736-2434
SUBJECT: Notice of Preparation of a Draft Environmental Impact Report.

The City of Corona will be the Lead Agency and will prepare an environmental impact report for the project identified below. We need to know the views of your agency as to the scope and content of the environmental information which is germane to your agency's statutory responsibilities in connection with the proposed project. Your agency will need to use the EIR prepared by our agency when considering your permit or other approval for the project.

The Project description, location, and the potential environmental effects are contained in the attached materials. ☒ A copy of the Initial Study IS attached.
☐ A copy of the Initial Study IS NOT attached.
☒ The proposed project IS considered a project of statewide, regional or areawide significance. ☐ The proposed project IS NOT considered a project of statewide, regional or areawide significance. ☐ The proposed project WILL affect highways or other facilities under the jurisdiction of the State Department of Transportation.
☒ The proposed project WILL NOT affect highways or other facilities under the jurisdiction of the State Department of Transportation.
☒ A scoping meeting WILL be held by the Lead Agency.
☐ A scoping meeting WILL NOT be held by the Lead Agency.

If the project meets the criteria requiring the scoping meeting, or if the agency voluntarily elects to hold such a meeting, the date, time and location of the scoping meeting are as follows:

Date: July 20, 2022 Time: 5:00 p.m. Location: Corona City Hall, Multi-Purpose Room, 400 S. Vicentia Avenue, Corona, CA 92882
Due to the time limits mandated by State law, your response must be sent at the earliest possible date, but not later than 30 days after receipt of this notice.

Please send your response to Joanne Coletta, Planning & Development Director at the address shown above or email at [email protected]. We will need the name of a contact person in your agency.

Project Title: City of Corona General Plan Housing Element Rezoning Program Update Project
Project Location – Specific: Identify street
address and cross street or attach a map
showing project site (preferably a U.S.G.S.
15’ or 7 ½’ topographical map identified by
quadrangle name):

City of Corona, California
Notice of Preparation 2 FORM “G”
Project Description: The City is proposing a rezoning program to accommodate the planning of low and moderate income households as required by the state’s Regional Housing Needs Assessment (RHNA) allocation for the City. The City’s Housing Element Update includes an inventory of properties that are intended to be rezoned to high density residential or an Affordable Housing Overlay (AHO) zone in order to plan for potential sites to accommodate the RHNA allocation of units that would also be suitable for low- and moderate-income units. The AHO zone is a new zone being proposed by the City to establish by-right development standards for affordable housing projects. The AHO zone will cover existing properties in the City that are currently developed with non-residential land uses. The overlay zone will allow current uses to remain but would allow property owners the option to develop per the underlying General Plan and zoning or the AHO zone. The City is proposing to create development standards (i.e., criteria for building setbacks, parking, building height, landscaping, open space amenities, lot coverage, etc.) and architectural design guidelines for the AHO zone.

Project Applicant (if any): City of Corona
California Environmental Protection Agency
Hazardous Waste List (if applicable):

Click to enter text
Date: June 29, 2022
Signature: Joanne Coletta
Name: Joanne Coletta
Title: Planning and Development Director
Telephone: (951) 736-2434
Consulting firm retained to prepare draft EIR (if applicable):

Name: Stantec Consulting Services Inc.

Address: 290 Conejo Ridge Avenue
City/State/Zip: Thousand Oaks, CA 91361
Contact Person: Christine Abraham
Reference: California Code of Regulations, Title 14, (CEQA Guidelines) Sections 15082(a), 15103, 15375.

General Plan Housing Element Update Rezoning Program
Summary
SCH Number
Lead Agency
Document Title
Document Type
Received
Present Land Use
Document Description
Contact Information
Name
Agency Name
Job Title
Contact Types
Address
Phone
Email
2022060732
City of Corona
General Plan Housing Element Update Rezoning Program
NOP - Notice of Preparation of a Draft EIR
6/30/2022
Varied land uses across the City of Corona
The City is proposing a rezoning program to accommodate the planning of low and moderate income households as required by the state's Regiona l Housing Needs Assessment (RHNA) allocation for the City. The City's Housing Element Update includes an inventory of properties that are intended to be rezoned to high density residential or an Affordable Housing Overlay (AHO) zone in order to plan for potential sites to accommodate the RHNA allocation of units that would also be suitable for low- and moderateincome units. The AHO zone is a new zone being proposed by the City to establish byright development standards for affordable housing projects. The AHO zone will cover existing properties in the City that are currently developed with non-residential land uses. The overlay zone will allow current uses to remain but would allow property owners the option to develop per the underlying General Plan and zoning or the AHO zone.

The City is proposing to create development standards (i.e., criteria for building setbacks, parking, building height, landscaping, open space amenities, lot coverage, etc.) and architectural design guidelines for the AHO zone.

Joanne Coletta
City of Corona Planning and Development Department
Planning and Development Director
Lead/Public Agency
400 S. Vicentia Avenue Suite 120
Corona, CA 92882
(951) 736-2434 1
[email protected]
1/3
Location
Cities
Counties
Regions
Cross Streets
Parcel#
State Highways
Railways
Schools
Notice of Completion
State Review Period
Start
State Review Period End
State Reviewing
Agencies
State Reviewing Agency
Comments
Development Types
Local Actions
Project Issues
Attachments
Corona
Riverside
Citywide
Multiple sites across the City of Corona
Multiple APNs listed
1-15, SR-91
Metrolin k
Corona USD campuses and private schools
7/1/2022
8/1/2022
California Air Resources Board (ARB), California Department of Forestry and Fire Protection (CAL FIRE), California Department of Housing and Community Development (HCD), California Department of Parks and Recreation, California Department of Transportation, District 8 (DOT), California Department of Transportation, Division of Aeronautics (DOT), California Department of Transportation, Division of Transportation Planning (DOT), California Department of Water Resources (DWR), California Governor's Office of Emergency Services (OES), California Highway Patrol (CHP), California Natural Resources Agency, California Public Utilities Commission (CPU(), California Regional Water Quality Control Board, Santa Ana Region 8 (RWQCB), California State Lands Commission (SLC), Department of Toxic Substances Control, Office of Historic Preservation, State Water Resources Control Board, Division of Drinking Water, State Water Resources Control Board, Division of Drinking Water, District 20, State Water Resources Control Board, Division of Water Quality, State Water Resources Control Board, Division of Water Rights, California Native American Heritage Commission (NAHC), California Department of Fish and Wildlife, Inland Deserts Region 6 (CDFW) California Native American Heritage Commission (NAHC), California Department of Fish and Wildlife, Inland Deserts Region 6 (CDFW)
Residential (Maximum residential units with buffer for planning purposes){Units 2415, Acres 111.45)
General Plan Amendment, General Plan Element, Specific Plan, Rezone, Redevelopment
Air Quality, Biological Resources, Cultural Resources, Energy, Geology/ Soils, Greenhouse Gas Emissions, Land Use/ Planning, Mineral Resources, Noise, Public Services, Transportation, Tribal Cultural Resources
2/3
Draft Environmental
Document [Draft IS,
NOI_NOA_Public
notices, OPR Summary
Form, Appx,]
Notice of Completion
[NOC] Transmittal form
State Comment Letters
[Comments from state
reviewing agencies]
Corona_Rezone_AHO_lnit1al_Study £ml ml3
Corona_Rezoning_AHO_NOP ID ml3
NOC_Corona_Rezone_AHO £ml EIJ3
2022060732_CDFW Comment Letter ID ml3
2022060732_NAHC Comment £ml ml3
Disclaimer: The Governor's Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact t he lead agency at the contact information listed above. You may also contact the OPR via email at [email protected] or via phone at (9JJiH15:9J;il.J. For more information, please visit QE'B'_s_M~_g_i~Lblli_ty_S.[tf;. 3/3
SENT VIA E-MAIL: July 26, 2022
[email protected]
Joanne Coletta, Director
City of Corona
Planning and Development Department
400 South Vecentia Avenue
Corona, California 92882
Notice of Preparation of a Draft Supplemental Environmental Impact Report for the City of Corona General Plan Housing Element Rezoning Program Update (Proposed Project)
South Coast Air Quality Management District (South Coast AQMD) staff appreciates the opportunity to comment on the above-mentioned document. Our comments are recommendations on the analysis of potential air quality impacts from the Proposed Project that should be included in the Draft Supplemental Environmental Impact Report (SEIR). Please send a copy of the Draft SEIR upon its completion and public release directly to South Coast AQMD as copies of the Draft SEIR submitted to the State Clearinghouse are not forwarded. In addition, please send all appendices and technical documents related to the air quality, health risk, and greenhouse gas analyses and electronic versions of all emission calculation spreadsheets, and air quality modeling and health risk assessment input and output files (not PDF files). Any delays in providing all supporting documentation for our review will require additional review time beyond the end of the comment period.

CEQA Air Quality Analysis
Staff recommends that the Lead Agency use South Coast AQMD’s CEQA Air Quality Handbook and website1as guidance when preparing the air quality and greenhouse gas analyses. It is also recommended that the Lead Agency use the CalEEMod2land use emissions software, which can estimate pollutant emissions from typical land use development and is the only software model maintained by the California Air Pollution Control Officers Association.

South Coast AQMD has developed both regional and localized significance thresholds. South Coast AQMD staff recommends that the Lead Agency quantify criteria pollutant emissions and compare the emissions to South Coast AQMD’s CEQA regional pollutant emissions significance thresholds3and localized significance thresholds (LSTs)4to determine the Proposed Project’s air quality impacts. The localized analysis can be conducted by either using the LST screening tables or performing dispersion modeling.

The Lead Agency should identify any potential adverse air quality impacts that could occur from all phases of the Proposed Project and all air pollutant sources related to the Proposed Project. Air quality impacts from both construction (including demolition, if any) and operations should be calculated. 1 South Coast AQMD’s CEQA Handbook and other resources for preparing air quality analyses can be found at:
http://www.aqmd.gov/home/rules-compliance/ceqa/air-quality-analysis-handbook. 2 CalEEMod is available free of charge at: www.caleemod.com. 3 South Coast AQMD’s CEQA regional pollutant emissions significance thresholds can be found at:
http://www.aqmd.gov/docs/default-source/ceqa/handbook/scaqmd-air-quality-significance-thresholds.pdf. 4 South Coast AQMD’s guidance for performing a localized air quality analysis can be found at:
http://www.aqmd.gov/home/regulations/ceqa/air-quality-analysis-handbook/localized-significance-thresholds.

J1it1 South Coast ~ Air Quality Management District
mJm 21865 Copley Drive, Diamond Bar, CA 9 1 765-4 I 78
r.l.!ltLl!J (909) 396-2000 , www.aqmd.gov
Joanne Coletta 2 July 26, 2022
Construction-related air quality impacts typically include, but are not limited to, emissions from the use of heavy-duty equipment from grading, earth-loading/unloading, paving, architectural coatings, off-road mobile sources (e.g., heavy-duty construction equipment) and on-road mobile sources (e.g., construction worker vehicle trips, material transport trips, and hauling trips). Operation-related air quality impacts may include, but are not limited to, emissions from stationary sources (e.g., boilers and air pollution control devices), area sources (e.g., solvents and coatings), and vehicular trips (e.g., on- and off-road tailpipe emissions and entrained dust). Air quality impacts from indirect sources, such as sources that generate or attract vehicular trips, should be included in the analysis. Furthermore, emissions from the overlapping construction and operational activities should be combined and compared to South Coast AQMD’s regional air quality CEQA operational thresholds to determine the level of significance.

If the Proposed Project generates diesel emissions from long-term construction or attracts diesel-fueled vehicular trips, especially heavy-duty diesel-fueled vehicles, it is recommended that the Lead Agency perform a mobile source health risk assessment5.

Sensitive receptors are people that have an increased sensitivity to air pollution or environmental contaminants and include schools, daycare centers, nursing homes, elderly care facilities, hospitals, and residential dwelling units. The Proposed Project may include residential units located in close proximity to freeways or other sources of air pollution like railroad tracks, and to facilitate the purpose of an EIR as an informational document, it is recommended that the Lead Agency perform a mobile source health risk assessment5to disclose the potential health risks6.

The California Air Resources Board’s (CARB) Air Quality and Land Use Handbook: A Community Health Perspective7is a general reference guide for evaluating and reducing air pollution impacts associated with new projects that go through the land use decision-making process with additional guidance on strategies to reduce air pollution exposure near high-volume roadways available in CARB’s technical advisory8.

The South Coast AQMD’s Guidance Document for Addressing Air Quality Issues in General Plans and Local Planning9includes suggested policies that local governments can use in their General Plans or through local planning to prevent or reduce potential air pollution impacts and protect public health. It is recommended that the Lead Agency review this Guidance Document as a tool when making local planning and land use decisions.

Mitigation Measures
In the event that the Proposed Project results in significant adverse air quality impacts, CEQA requires that all feasible mitigation measures that go beyond what is required by law be utilized to minimize these impacts. Any impacts resulting from mitigation measures must also be analyzed. Several resources to assist the Lead Agency with identifying potential mitigation measures for the Proposed Project include South Coast AQMD’s CEQA Air Quality Handbook1, South Coast AQMD’s Mitigation Monitoring and Reporting Plan for the 2016 Air Quality Management Plan10, and Southern California Association of 5 South Coast AQMD’s guidance for performing a mobile source health risk assessment can be found at:
http://www.aqmd.gov/home/regulations/ceqa/air-quality-analysis-handbook/mobile-source-toxics-analysis. 6 Ibid.
7 CARB’s Air Quality and Land Use Handbook: A Community Health Perspective can be found at:
http://www.arb.ca.gov/ch/handbook.pdf.
8 CARB’s technical advisory can be found at: https://www.arb.ca.gov/ch/landuse.htm. 9 South Coast AQMD. 2005. Guidance Document for Addressing Air Quality Issues in General Plans and Local Planning.

Available at: http://www.aqmd.gov/docs/default-source/planning/air-quality-guidance/complete-guidance-document.pdf. 10 South Coast AQMD’s 2016 Air Quality Management Plan can be found at: http://www.aqmd.gov/docs/defaultsource/Agendas/Governing-Board/2017/2017-mar3-035.pdf (starting on page 86).

Joanne Coletta 3 July 26, 2022
Government’s Mitigation Monitoring and Reporting Plan for the 2020-2045 Regional Transportation Plan/Sustainable Communities Strategy11.

Health Risk Reduction Strategies
Many strategies are available to reduce exposures, including, but are not limited to, building filtration systems with MERV 13 or better, or in some cases, MERV 15 or better is recommended; building design, orientation, location; vegetation barriers or landscaping screening, etc. Enhanced filtration units are capable of reducing exposures. However, enhanced filtration systems have limitations. For example, in a study that South Coast AQMD conducted to investigate filters12, a cost burden is expected to be within the range of $120 to $240 per year to replace each filter panel. The initial start-up cost could substantially increase if an HVAC system needs to be installed and if standalone filter units are required. Installation costs may vary and include costs for conducting site assessments and obtaining permits and approvals before filters can be installed. Other costs may include filter life monitoring, annual maintenance, and training for conducting maintenance and reporting. In addition, because the filters would not have any effectiveness unless the HVAC system is running, there may be increased energy consumption that the Lead Agency should evaluate in the Draft SEIR. It is typically assumed that the filters operate 100 percent of the time while residents are indoors, and the environmental analysis does not generally account for the times when the residents have their windows or doors open or are in common space areas of the project.

These filters have no ability to filter out any toxic gases. Furthermore, when used filters are replaced, replacement has the potential to result in emissions from the transportation of used filters at disposal sites and generate solid waste that the Lead Agency should evaluate in the Draft SEIR. Therefore, the presumed effectiveness and feasibility of any filtration units should be carefully evaluated in more detail prior to assuming that they will sufficiently alleviate exposures to diesel particulate matter emissions.

South Coast AQMD staff is available to work with the Lead Agency to ensure that air quality, greenhouse gas, and health risk impacts from the Proposed Project are accurately evaluated and mitigated where feasible. If you have any questions regarding this letter, please contact me at [email protected].

Sincerely,
Michael Morris
Michael Morris
Planning and Rules Manager, CEQA IGR
Planning, Rule Development & Area Sources
MM
RVC220712-02
Control Number
11 Southern California Association of Governments’ 2020-2045 RTP/SCS can be found at:
https://www.connectsocal.org/Documents/PEIR/certified/Exhibit-A_ConnectSoCal_PEIR.pdf. 12 This study evaluated filters rated MERV 13 or better. Accessed at: http://www.aqmd.gov/docs/defaultsource/ceqa/handbook/aqmdpilotstudyfinalreport.pdf. Also see 2012 Peer Review Journal article by South Coast AQMD:
https://onlinelibrary.wiley.com/doi/10.1111/ina.12013.

August 1, 2022
Joanne Coletta, Director
City of Corona, Planning and Development Department
400 South Vicentia Avenue
Corona, California 92882
Phone: (951) 736-2434
E-mail: [email protected]
RE: SCAG Comments on the Notice of Preparation of a Draft Supplemental Environmental Impact Report for the City of Corona General Plan Housing Element Update Rezoning Program [SCAG NO. IGR10678]
Dear Joanne Coletta,
Thank you for submitting the Notice of Preparation of a Draft Supplemental Environmental Impact Report for the City of Corona General Plan Housing Element Update Rezoning Program (“proposed project”) to the Southern California Association of Governments (SCAG) for review and comment. SCAG is responsible for providing informational resources to regionally significant plans, projects, and programs per the California Environmental Quality Act (CEQA) to facilitate the consistency of these projects with SCAG’s adopted regional plans, to be determined by the lead agencies.1
Pursuant to Senate Bill (SB) 375, SCAG is the designated Regional Transportation Planning Agency under state law and is responsible for preparation of the Regional Transportation Plan (RTP) including the Sustainable Communities Strategy (SCS). SCAG’s feedback is intended to assist local jurisdictions and project proponents to implement projects that have the potential to contribute to attainment of Regional Transportation Plan/Sustainable Communities Strategy (RTP/SCS) goals and align with RTP/SCS policies. Finally, SCAG is the authorized regional agency for Intergovernmental Review (IGR) of programs proposed for Federal financial assistance and direct Federal development activities, pursuant to Presidential Executive Order 12372.

SCAG staff has reviewed the Notice of Preparation of a Draft Supplemental Environmental Impact Report for the City of Corona General Plan Housing Element Update Rezoning Program in Riverside County. The proposed project includes an update to the City's Housing Element to add a rezoning program to accommodate the planning of low- and moderate-income households.

When available, please email environmental documentation to [email protected] providing, at a minimum, the full public comment period for review.

If you have any questions regarding the attached comments, please contact the Intergovernmental Review (IGR) Program, attn.: Annaleigh Ekman, Associate Regional Planner, at (213) 630-1427 or [email protected]. Thank you.

Sincerely,
Frank Wen, Ph.D.

Manager, Planning Strategy Department
1 Lead agencies such as local jurisdictions have the sole discretion in determining a local project’s consistency with the 2020 RTP/SCS (Connect SoCal) for the purpose of determining consistency for CEQA. ••• •I•• ---

INNOVATING FOR A BETTER
--~
TOMORROW ™

SOUTHERN CALIFORNIA

ASSOCIATION OF GOVERNMENTS
900 Wilshire Blvd., Ste. 1700
Los Angeles, CA 90017
T· (213) 236-1800
www.scag.ca.gov

REGIONAL COUNCIL OFFICERS
President
Jan C. Harnik, Riverside County
Transportation Commission
First Vice President
Carmen Ramirez, County of Ventura
Second Vice President
Art Brown, Buena Park
Immediate Past President
Clint Lorimore, Eastvale

COMMITTEE CHAIRS
Executive/Administration
Jan C. Harnik, Riverside County
Transportation Commission
Community, Economic &
Human Development
Frank Yokoyama, Cerritos
Energy & Environment
Deborah Robertson, Rialto
Transportation
Ray Marquez, Chino Hills
August 1, 2022 SCAG No. IGR10678
Joanne Coletta Page 2

COMMENTS ON THE NOTICE OF PREPARATION OF A

DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT REPORT FOR THE
CITY OF CORONA GENERAL PLAN HOUSING ELEMENT UPDATE REZONING PROGRAM [SCAG NO. IGR10678]

CONSISTENCY WITH CONNECT SOCAL
SCAG provides informational resources to facilitate the consistency of the proposed project with the adopted 2020-2045 Regional Transportation Plan/Sustainable Communities Strategy (RTP/SCS or Connect SoCal). For the purpose of determining consistency with CEQA, lead agencies such as local jurisdictions have the sole discretion in determining a local project’s consistency with Connect SoCal.

CONNECT SOCAL GOALS
The SCAG Regional Council fully adopted Connect SoCal in September 2020. Connect SoCal, also known as the 2020 – 2045 RTP/SCS, builds upon and expands land use and transportation strategies established over several planning cycles to increase mobility options and achieve a more sustainable growth pattern. The long-range visioning plan balances future mobility and housing needs with goals for the environment, the regional economy, social equity and environmental justice, and public health. The goals included in Connect SoCal may be pertinent to the proposed project.

These goals are meant to provide guidance for considering the proposed project. Among the relevant goals of Connect SoCal are the following:

SCAG CONNECT SOCAL GOALS
Goal #1: Encourage regional economic prosperity and global competitiveness Goal #2: Improve mobility, accessibility, reliability and travel safety for people and goods Goal #3: Enhance the preservation, security, and resilience of the regional transportation system Goal #4: Increase person and goods movement and travel choices within the transportation system Goal #5: Reduce greenhouse gas emissions and improve air quality Goal #6: Support healthy and equitable communities
Goal #7: Adapt to a changing climate and support an integrated regional development pattern and transportation network
Goal #8: Leverage new transportation technologies and data-driven solutions that result in more efficient travel Goal #9: Encourage development of diverse housing types in areas that are supported by multiple transportation options
Goal #10: Promote conservation of natural and agricultural lands and restoration of habitats For ease of review, we encourage the use of a side-by-side comparison of SCAG goals with discussions of the consistency, non-consistency or non-applicability of the goals and supportive analysis in a table format. Suggested format is as follows:

August 1, 2022 SCAG No. IGR10678
Joanne Coletta Page 3

SCAG CONNECT SOCAL GOALS
Goal Analysis
Goal #1: Encourage regional economic prosperity and global competitiveness
Consistent: Statement as to why;
Not-Consistent: Statement as to why;
Or
Not Applicable: Statement as to why;
DEIR page number reference
Goal #2: Improve mobility, accessibility, reliability and travel safety for people and goods
Consistent: Statement as to why;
Not-Consistent: Statement as to why;
Or
Not Applicable: Statement as to why;
DEIR page number reference
etc. etc.

Connect SoCal Strategies
To achieve the goals of Connect SoCal, a wide range of land use and transportation strategies are included in the accompanying twenty (20) technical reports. Of particular note are multiple strategies included in Chapter 3 of Connect SoCal intended to support implementation of the regional Sustainable Communities Strategy (SCS) framed within the context of focusing growth near destinations and mobility options; promoting diverse housing choices; leveraging technology innovations; supporting implementation of sustainability policies; and promoting a Green Region. To view Connect SoCal and the accompanying technical reports, please visit the Connect SoCal webpage.

Connect SoCal builds upon the progress from previous RTP/SCS cycles and continues to focus on integrated, coordinated, and balanced planning for land use and transportation that helps the SCAG region strive towards a more sustainable region, while meeting statutory requirements pertinent to RTP/SCSs. These strategies within the regional context are provided as guidance for lead agencies such as local jurisdictions when the proposed project is under consideration.

DEMOGRAPHICS AND GROWTH FORECASTS
A key, formative step in projecting future population, households, and employment through 2045 for Connect SoCal was the generation of a forecast of regional and county level growth in collaboration with expert demographers and economists on Southern California. From there, jurisdictional level forecasts were ground-truthed by subregions and local agencies, which helped SCAG identify opportunities and barriers to future development. This forecast helps the region understand, in a very general sense, where we are expected to grow, and allows SCAG to focus attention on areas that are experiencing change and may have increased transportation needs. After a year-long engagement effort with all 197 jurisdictions one-on-one, 82 percent of SCAG’s 197 jurisdictions provided feedback on the forecast of future growth for Connect SoCal. SCAG also sought feedback on potential sustainable growth strategies from a broad range of stakeholder groups – including local jurisdictions, county transportation commissions, other partner agencies, industry groups, community-based organizations, and the general public. Connect SoCal utilizes a bottomup approach in that total projected growth for each jurisdiction reflects feedback received from jurisdiction staff, including city managers, community development/planning directors, and local staff. Growth at the neighborhood level (i.e., transportation analysis zone (TAZ) reflects entitled projects and adheres to current general and specific plan maximum densities as conveyed by jurisdictions (except in cases where entitled projects and development agreements exceed these capacities as calculated by SCAG). Neighborhood level growth projections also feature strategies that help to reduce greenhouse gas emissions (GHG) from automobiles and light trucks to achieve Southern California’s GHG reduction target, approved by the California Air Resources Board (CARB) in accordance with state planning law. Connect SoCal’s Forecasted Development Pattern is utilized for long range modeling purposes and does not supersede actions taken by elected bodies on future development, including entitlements and development agreements. SCAG does not have the authority to implement the plan -- neither through decisions about what type of development is built where, nor what transportation projects are ultimately built, as Connect August 1, 2022 SCAG No. IGR10678
Joanne Coletta Page 4
SoCal is adopted at the jurisdictional level. Achieving a sustained regional outcome depends upon informed and intentional local action. To access jurisdictional level growth estimates and forecasts for years 2016 and 2045, please refer to the Connect SoCal Demographics and Growth Forecast Technical Report. The growth forecasts for the region and applicable jurisdictions are below.

Adopted SCAG Region Wide Forecasts Adopted City of Corona Forecasts Year 2020 Year 2030 Year 2035 Year 2045 Year 2020 Year 2030 Year 2035 Year 2045 Population 19,517,731 20,821,171 21,443,006 22,503,899 166,904 174,061 177,702 185,073 Households 6,333,458 6,902,821 7,170,110 7,633,451 47,358 49,407 50,437 52,444 Employment 8,695,427 9,303,627 9,566,384 10,048,822 81,271 84,480 85,547 92,776

MITIGATION MEASURES
SCAG staff recommends that you review the Final Program Environmental Impact Report (Final PEIR) for Connect SoCal for guidance, as appropriate. SCAG’s Regional Council certified the PEIR and adopted the associated Findings of Fact and a Statement of Overriding Considerations (FOF/SOC) and Mitigation Monitoring and Reporting Program (MMRP) on May 7, 2020 and also adopted a PEIR Addendum and amended the MMRP on September 3, 2020 (please see the PEIR webpage and scroll to the bottom of the page for the PEIR Addendum). The PEIR includes a list of project-level performance standards-based mitigation measures that may be considered for adoption and implementation by lead, responsible, or trustee agencies in the region, as applicable and feasible. Project-level mitigation measures are within responsibility, authority, and/or jurisdiction of project-implementing agency or other public agency serving as lead agency under CEQA in subsequent project- and site- specific design, CEQA review, and decision-making processes, to meet the performance standards for each of the CEQA resource categories.

REGIONAL HOUSING NEEDS ALLOCATION
On March 4, 2021 SCAG’s Regional Council adopted the 6
th cycle Final Regional Housing Needs Assessment (RHNA) Allocation Plan which covers the planning period October 2021 through October 2029. The 6th cycle Final RHNA allocation for the applicable jurisdiction is below.

SCAG 6th Cycle Final RHNA Allocation for City of Corona Income Category RHNA Allocation (Units)
Very low income 1752
Low income 1040
Moderate income 1096
Above moderate income 2200
Total RHNA Allocation 6088
Sixth cycle housing elements were due to the California Department of Housing and Community Development (HCD) by October 15, 2021. SCAG encourages jurisdictions to adopt a housing element in compliance with State housing law as determined by review from HCD. Jurisdictions that do not have an adopted compliant housing element may be ineligible for certain State funding and grant opportunities and may be at risk for legal action from stakeholders or HCD.

SCAG staff would like to call your attention to SCAG’s HELPR 2.0, a web-mapping tool developed by SCAG to help local jurisdictions and stakeholders understand local land use, site opportunities, and environmental sensitivities for aligning housing planning with the state Department of Housing and Community Development’s (HCD) 6th cycle housing element requirements.

From: Abraham, Christine
To: Abraham, Christine
Subject: FW: City of Corona General Plan Housing element rezoning program Date: Tuesday, August 23, 2022 8:38:17 AM
Attachments: image004.png
image005.png
From: Joanne Coletta <[email protected]>
Sent: Monday, July 18, 2022 2:09 PM
To: Vega, Jaqueline <[email protected]>; GPUpdate <[email protected]> Cc: Rull, Paul <[email protected]>
Subject: RE: City of Corona General Plan Housing element rezoning program Jaqueline,
Thank you for your response to the city’s Housing Element Rezoning Program. I would like to provide clarification as it relates to Corona Municipal Airport Influence Area.

The city updated its General Plan in 2020 and the ALUC on March 12, 2020 determined the city’s General Plan to be consistent with the 2004 Corona Municipal Airport Land Use Compatibility Plan. Attached is the letter the city received from the ALUC.

The city is proposing a housing overlay zone to existing properties to meet its Regional Housing Needs Assessment identified in the General Plan Housing Element. The overlay zone will not change the underlying zoning of the property. For example, if a property is zoned C-3/AHO, it means the C-3 uses can continue, but the site can be redeveloped to accommodate affordable housing. Additionally, the letter from the ALUC indicates that the city is only subject to ALUC review if changes are proposed within the Airport Influence Area.

The below exhibits show the Corona Airport Influence Area and the properties within the city that are being rezoned to have an affordable housing overlay zone. The subject properties are outside the AIA, except for one property located at the corner of Lincoln Avenue and Railroad Avenue (APN 118-210-041). The zoning of this property will remain C-3 (General Commercial), but will have an affordable housing overlay zone should the owner in the future be interested in redeveloping the site with affordable housing.

The city is on a compressed timeline to meet the state’s rezoning deadline by October 15, 2022. Therefore, the review of this one parcel by the ALUC will likely overlap with the city’s process or occur afterwards. Therefore, the city can hold off adopting the rezoning on this one parcel until its reviewed by the ALUC.

Please let me know if you have additional questions.

Thank you.

Joanne
From: Vega, Jaqueline <[email protected]>
I
I
I
I
I
I
\
\
\
\
-------- . '•
Proposed Affordable Housing overlay Zones
Leg end
□ AirportCompatibilityZones
Cl Corona Municipal Airport
• Runway
• Agriculture
• Estate Residential
• Rural Residential
Low Density Residential
Low Medium Density Residential
Medium Density Residential
High Density Residential
• Urban Density Residential
• General Commercial
• Office Professional
• Mixed Use Downtown
• Mixed Use: Commercial/Residential
• Mixed Use: Industrial/Commercial
• Lightlndustrial
• General Industrial
• Open Space General
• Parks & Open Space Recreational
School
• FireStation
Utility
L:] City Boundary
:: .~ Sphere of Influence Areas
Sourct:

Cityo(Corono, Z019; R1wt1idtCO<JntyLond U~
Compotibdity Pion Policy Document October 2004
,-----------------,-----,,---...--.-,------------------------, CJ N"Chbofhoods "
= - ~:b~::1;"11
u 16
Conb>I
Caona
Sixth Street
Northe.st co,.,.,.
co...,. ""'
0 1J)O(I ?,o(ICI H
._.. A
QtydCalitna,.Ccull)'Of
~Caiifomit9:ite~
(511,t1ER!.~~
(M~11'1:,IET1,/
NASA,UstiS,IIUA!ilualU"<I
"°'N!l~EPi\~US
From: Joanne Coletta
To: Rull, Paul
Cc: Vega, Jaqueline
Subject: RE: City of Corona General Plan Housing element rezoning program Attachments: image001.png
image003.png
image004.png
ALUC Application Letter.pdf
Hello, Paul.

The City of Corona put together an application package for a non-impact legislative review. The application package will be sent FedEx to your office along with a check for the application fee.

Attached is a copy of the cover letter (without attachments) that is included as part of the application package.

Please do not hesitate to contact me if you have any questions during your review of the material.

Thank you.

Joanne
From: Rull, Paul <[email protected]>
Sent: Tuesday, July 19, 2022 1:16 PM
To: Joanne Coletta <[email protected]>
Cc: Vega, Jaqueline <[email protected]>
Subject: RE: City of Corona General Plan Housing element rezoning program [CAUTION] DO NOT CLICK links or attachments unless you recognize the sender and know the content is safe.

Thank you for the conversation Joanne.

As a recap, ALUC staff will wait for your application (see attached) submittal sometime near the end of August when your consultant has finished the working document.

The project will be reviewed administratively by ALUC as a “non-impact legislative” case with a fee amount of $420, and review can be completed in a couple of days.

Thank you.

If you have any questions, please feel free to contact me.

Paul Rull
ALUC Director
From: Rull, Paul
Sent: Monday, July 18, 2022 2:49 PM
To: Joanne Coletta <[email protected]>
Subject: RE: City of Corona General Plan Housing element rezoning program Thank you Joanne for your comments.

As you are aware, ALUC review is required under PUC Section 21676 for any GPA or zoning amendment within an AIA. Based on your summary, it appears that one parcel of the overall project (APN 118-210-041) is located within Zone D of the Corona AIA, and therefore the City’s Housing Element update would be subject to ALUC review. In addition, any future rezoning of the property would also require ALUC review.

If timing is of a particular concern, there is the potential that this project “could” be reviewed by ALUC as a non-impact legislative case which does not require a public hearing and can be expediated quickly, but in order to determine this, additional information would be needed regarding the “affordable housing overlay” for this parcel (as it relates with the underlying compatibility Zone D).

I will be in the office tomorrow if you would like to discuss the matter further.

Paul Rull
ALUC Director
l g l
From: Joanne Coletta <[email protected]>
Sent: Monday, July 18, 2022 2:09 PM
To: Vega, Jaqueline <[email protected]>; GPUpdate <[email protected]> Cc: Rull, Paul <[email protected]>
Subject: RE: City of Corona General Plan Housing element rezoning program CAUTION: This email originated externally from the Riverside County email system. DO NOT click links or open attachments unless you recognize the sender and know the content is safe.

Jaqueline,
Thank you for your response to the city’s Housing Element Rezoning Program. I would like to provide clarification as it relates to Corona Municipal Airport Influence Area.

The city updated its General Plan in 2020 and the ALUC on March 12, 2020 determined the city’s General Plan to be consistent with the 2004 Corona Municipal Airport Land Use Compatibility Plan. Attached is the letter the city received from the ALUC.

The city is proposing a housing overlay zone to existing properties to meet its Regional Housing Needs Assessment identified in the General Plan Housing Element. The overlay zone will not change the underlying zoning of the property. For example, if a property is zoned C-3/AHO, it means the C-3 uses can continue, but the site can be redeveloped to accommodate affordable housing. Additionally, the letter from the ALUC indicates that the city is only subject to ALUC review if changes are proposed within the Airport Influence Area.

The below exhibits show the Corona Airport Influence Area and the properties within the city that are being rezoned to have an affordable housing overlay zone. The subject properties are outside the AIA, except for one property located at the corner of Lincoln Avenue and Railroad Avenue (APN 118-210-041). The zoning of this property will remain C-3 (General Commercial), but will have an affordable housing overlay zone should the owner in the future be interested in redeveloping the site with affordable housing.

The city is on a compressed timeline to meet the state’s rezoning deadline by October 15, 2022. Therefore, the review of this one parcel by the ALUC will likely overlap with the city’s process or occur afterwards. Therefore, the city can hold off adopting the rezoning on this one parcel until its reviewed by the ALUC.

Please let me know if you have additional questions.

Thank you.

Joanne
• I
You don't often get email from [email protected]. Learn why this is important Sent: Tuesday, July 12, 2022 10:54 AM
To: GPUpdate <[email protected]>
Cc: Rull, Paul <[email protected]>
Subject: City of Corona General Plan Housing element rezoning program [CAUTION] DO NOT CLICK links or attachments unless you recognize the sender and know the content is safe.

To whom this may concern,
Thank you for transmitting the above referenced project to ALUC for review. Please note that the proposed project is located Citywide within Corona Municipal AIA, and review by ALUC is required because of the legislative action.

Please see attached our application.

Please contact me for any questions.

Jackie Vega
Urban Regional Planner I
Confidentiality Disclaimer
This email is confidential and intended solely for the use of the individual(s) to whom it is addressed. The information contained in this message may be privileged and confidential and protected from disclosure.

If you are not the author's intended recipient, be advised that you have received this email in error and that any use, dissemination, forwarding, printing, or copying of this email is strictly prohibited. If you have received this email in error please delete all copies, both electronic and printed, and contact the author immediately.

County of Riverside California
Riverside County .,Airport Land Use Commission
4080 lemon Street. 14 floor
Riverside, Ci, 9250 1
(95 1) 955-0982
Javegn@BJVCO OBG
www-rc:aruc om
L-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------:
1 August 30, 2022
Paul Rull, ALUC Director
Riverside County Airport Land Use Commission
County Administrative Center
4080 Lemon Street, 14th Floor
Riverside, CA 92501
CC: Via Email [email protected]
RE: Non-Impact Legislative Review by ALUC Director
City of Corona General Plan Housing Element Rezoning Program Zone Change and General Plan Amendment on APN 118-210-041 Dear Mr. Rull:

The City of Corona is proposing an Affordable Housing Overlay Zone on several properties within the City to meet its Regional Housing Needs Assessment identified in the General Plan Housing Element. One property is located within the boundary of Corona Municipal Airport Compatibility Zone D, which requires review by the ALUC.

The subject property is located at 1065 Railroad Street (APN 118-210-041). The zoning of the property is C3 (General Commercial) and the General Plan is GC (General Commercial). The zone change will apply an Affordable Housing Overlay (AHO) to the property. The existing C-3 zone will remain on the property, but the overlay zone will allow residential uses, which is not currently allowed in the C-3 zone. The General Plan will also be amended to change the land use from GC to Mixed Use 1, which will allow for commercial and residential.

The AHO zone is for high density residential development with a density range between 36 to 60 dwelling units to the acre. The density range meets the minimum residential density of 5 dwelling units to the acre required by Airport Compatibility Zone D.

The proposed change to the City’s General Plan Land Use Element Table is provided as part of the application. The exhibit describes the density allowed in the MU1 designation if the property includes an AHO zone. The property location is also included for reference. 400 S. Vicentia Avenue, Corona, California 92882
P (951) 736-2262
www.CoronaCA.gov

PLANNING & DEVELOPMENT DEPARTMENT
“Promoting and Sustaining Quality Development”
2 The proposed change in land use is consist with Corona General Plan Land Policy 23.4, which is to Review proposed projects within the airport influence area of the Corona Municipal Airport for consistency with applicable airport land use compatibility plan policies adopted by the Riverside County Airport Land Use Commission and City of Corona.

The AHO zone and MU1 General Plan land use designation allows a residential density range of 36 to 60 du/ac which exceeds the minimum density of 5 du/ac for Airport Land Use Compatibility Zone D.

The proposed change in land use is consist with Corona General Plan Land Policy 23.8, which is to Prior to the adoption or amendment of the general plan or any specific plan, or the adoption or amendment of a zoning ordinance or building regulation within the airport influence area of any airport land use compatibility plan, refer such proposed actions to the ALUC for review and determination as provided by the airport land use law.

The AHO zone and MU1 General Plan land use designation is compatible with Airport Land Use Compatibility Zone D and falls within the scope of a non-impact legislative review by the ALUC.

Sincerely,
Joanne Coletta
Joanne Coletta
Planning & Development Director
Attachments
CHAIR
Steve Manos
Lake Elsinore

VICE CHAIR
Russell Betts
Desert Hot Springs

COMMISSIONERS
Arthur Butler
Riverside
John Lyon
Riverside
Steven Stewart
Palm Springs
Richard Stewart
Moreno Valley
Gary Youmans
Temecula
STAFF
Director
Simon A. Housman
John Guerin
Paul Rull
Barbara Santos
County Administrative Center
4080 Lemon Sl,14th Floor.

AIRPORT LAND USE COMMISSION

RIVERSIDE COUNTY
March 26, 2020
Ms. Joanne Coletta, Community Development Director
City of Corona
400 S. Vicentia Avenue
Corona, CA 92882
RE: AIRPORT LANO USE COMMISSION (ALUC) DEVELOPMENT REVIEW File No.:

Related File Nos.:

APNs:

Dear Ms. Coletta:

ZAP1012CO20
City of Corona General Plan 2040/General Plan Technical Update
Citywide
On March 12, 2020, the Riverside County Airport Land Use Commission (ALUC) found the proposed City of Corona General Plan 2040/General Plan Technical Update, as amended to include the Notes specified below, CONSISTENT with the 2004 Corona Municipal Airport Land Use Compatibility Plan.

This determination of consistency is contingent upon action by the City Council of the City of Corona adopting this General Plan Update with the Notes specified below, with only such additional changes (if any) as may be reviewed by the ALUC Director and determined to be de minimis relative to airport compatibility. Any other changes to the proposed text and/or mapped designations of land within the Airport Influence Area will require subsequent review and additional hearing(s) by the Riverside County Airport Land Use Commission.

Riverside, CA 92501
(951 i955_5132 Add a Note 3 to Table LU-1 applicable to the Low Density Residential designation stating www.rcaluc.org
as follows: "Within Airport Compatibility Zone D, new development must have a density of at least 5 dwelling units per acre."
Add a Note 4 to Table LU-1 applicable to the General Commercial, Office Professional, General Industrial, and Light Industrial designations stating as follows: "Permissible intensity levels [maximum FARs] are lower within Airport Compatibility Zones C and D of the Corona Municipal Airport Influence Area, where limitations on the number of persons per acre apply."
Supporting documentation, including but not limited to the entire text of the proposed General Plan as submitted on January 14, 2020, was provided to the Airport Land Use Commission and is available on line at www.rcaluc.org , click Agendas, click 03-12-20 Agenda, Bookmark Agenda Item 3.1.

If you have any questions, please contact John Guerin, ALUC Principal Planner, at (951) 955- 0982.

Sincerely,
RIVERSIDE cou7;PORT : D us~ COMMISSION
Simo~ o,---
cc: Curtis Showalter, Manager, Corona Municipal Airport Y:\AIRPORT CASE FILES\Corona\ZAP1012CO20\ZAP1012CO20.L TR.doc 2 COUNTY OF RIVERSIDE

AIRPORT LAND USE COMMISSION

STAFF REPORT
AGENDA ITEM: 3.1
HEARING DA TE: March 12, 2020
CASE NUMBER: ZAP1012CO20 - City of Corona (Representative: Joanne Coletta, Community Development Director}
APPROVING JURISDICTION: City of Corona
JURISDICTION CASE NO: General Plan 2040 - General Plan Technical Update LAND USE PLAN: 2004 Corona Municipal Airport Land Use Compatibility Plan a. Airport Influence Area: Corona Municipal Airport
b. Land Use Policy: all Airport Compatibility Zones (A, Bl, B2, C, D, and E) c. Noise Levels: From below 55 CNEL to above 65 CNEL (within airport grounds)
MAJOR ISSUES: Although most of the land area in Compatibility Zone Dis designated for nonresidential uses, portions of the northeasterly area of Zone D are designated Low Density Residential (3 to 6 dwelling units per acre). For most of this area, the designation reflects the density of existing built-out neighborhoods. However, to the extent that this designation would permit subdivision of larger parcels in a manner that would result in net densities less than five dwelling units per acre, this would conflict with the Zone D prohibition of intermediate densities. To resolve this potential conflict, ALUC staff is recommending adding a Note stating that new Low Density Residential development within Zone D must have a density of at least 5 dwelling units per acre.

In 2004, Mead & Hunt noted that nonresidential intensities in Compatibility Zones C and D were potentially inconsistent with Compatibility Plan criteria. To resolve this potential conflict, ALUC staff is recommending adding a Note stating that permissible intensity levels (maximum FARs) are lower within Compatibility Zones C and D of the Corona Municipal Airport Influence Area, where limitations on the number of persons per acre apply.

RECOMMENDATIONS:

Provided that the Notes referenced above and specified on page 5 of this report are added to the General Plan document, staff recommends that the proposed City of Corona General Plan 2040/General Plan Technical Update be found CONSISTENT with the Corona Municipal Airport Land Use Compatibility Plan.

Staff Report

Page 2 of 5 ends

PROJECT DESCRIPTION: The City of Corona proposes to adopt an updated General Plan ("General Plan 2040"), including the following elements: Land Use, Housing, Circulation, Noise, Public Safety, Environmental Resources (including Conservation and Open Space), Healthy Community (including Environmental Justice), Infrastructure and Utilities, Community Design, Parks, Recreation, Cultural Arts, and Education, Economic Development, and Historic Resources.

An Introduction chapter is also included.

PROJECT LOCATION: Citywide (Note: Except for objects 200 feet or greater in height, the jurisdiction of the Airport Land Use Commission is limited to the portions of the City within the Airport Influence Area of Corona Municipal Airport.)
BACKGROUND:
2004 CONSISTENCY REVIEW OF 2003 DRAFT GENERAL PL.Ai~: At the time of preparation of the 2004 Corona Municipal Airport Land Use Compatibility Plan ( .. CMALUCP"), Plan consultant Mead & Hunt conducted a preliminary consistency review of the City's 2003 Draft General Plan and cited concerns relating to nonresidential intensities in Compatibility Zones C and D, allowance for residential development in areas subject to noise levels exceeding 60 dB CNEL, Citywide height limit of 55 feet, and failure to acknowledge ALUC coordination.

AIRPORT LAND USE COMPATIBILITY REFERENCES IN GENERAL PLAN TEXT:

Land Use Element: The proposed Land Use Element includes a discussion of Corona Municipal Airport on page LU-57, and the following page specifies the City's goal and policies.

Goal LU-23 is to "Maintain and improve the Corona Municipal Airport as a general aviation facility consistent with its approved master plan and all applicable county, state, and federal regulations and local ordinances."
Policy LU-23 .2 states as follows: "Work cooperatively with the Riverside County Airport Land Use Commission in periodically refining, implementing, and protecting airport influence zones around the Corona Municipal Airport."
Policy LU-23 .3 states that the City will "Work to limit the encroachment of uses that potentially pose a threat to continued airport operations, including intensification of residential, commercial, and industrial facilities within the airport safety zone and areas impacted by airport noise." Policy LU-23.4 states that the City will "Review proposed projects within the airport influence area of the Corona Municipal Airport for consistency with applicable airport land use compatibility plan policies adopted by the Riverside County Airport Land Use Commission and City of Corona." Policy LU-23.5 states that the City will "limit building heights and land use intensities beneath airport approaches and departure paths to protect public safety, comply with the Corona Municipal Airport Land Use Compatibility Plan, and applicable state and federal regulations." Staff Report

Page 3 of 5 ends

Policy LU-23.8 states that "Prior to the adoption or amendment of the general plan or any specific plan, or the adoption or amendment of a zoning ordinance or building regulation within the airport influence area of any airport land use compatibility plan, [ the City will J refer such proposed actions to the ALUC for review and determination as provided by the airport land use law." Safety Element: The proposed Safety Element includes a discussion of airport hazards on page PS27, a description of our airport zones and a small map of the zones on page PS-28, and the following page specifies the City's goal and policies.

Goal PS-4 is to "hnplement land use restrictions and review procedures that encourage adequate protection of the community, its residents, and business from airport land use and flight-related hazards."
Policy PS-4.3 states that the City will "Ensme that review by the Riverside County Airport Land Use Commission for projects within the airport influence area occurs within the early stages of the development review process by the City and prior to project approval by the City." Policy PS-4.6 states that the City will "Periodically monitor the potential for wildlife hazards to the flights and operations of the Corona Municipal Airport emanating from the Prado Basin, retention basins, golf courses, Santa Ana River, or other areas. Comply with federal wildlife strike hazards regulations if hazard exists."
Policy PS-4.7 states that the City will "Periodically consult with the Riverside County Airport Land Use Commission in matters affecting the operation of the Corona Municipal Airport and in regard to proposed development within the Influence Area that affect the safety and operations of the airport." LAND USE DESIGNATIONS AND COMPATIBILITY ZONES:

Compatibility Zones Bl and B2: All of the land in Compatibility Zones A and B2, and almost all of the land in Compatibility Zone B 1 is designated Open Space- General. Table LU-1 on page LU-8 states that this designation "accommodates lands permanently committed or protected for open space due to value as habitat, topography, scenic quality, public safety (e.g., flood control channels), or comparable purpose." The entire airport is located within this designation. Table LU-1 indicates that density/intensity is not applicable in this designation. These areas are entirely under public ownership- the federal government, the City of Corona, and Orange County Flood Control District.

Compatibility Zone C - Residential: There are no residentially designated parcels within Compatibility Zone C.

Compatibility Zone C - Nonresidential: Properties in Compatibility Zone Care designated General Industrial, Open Space-General, Parks and Open Space Recreational, and Public and InstitutionalUtility. Intensity is listed as "Not applicable" within the Open Space-General and Parks and Open Space Recreational designations and "Based on implementing zone" within the Public and Institutional designation.

Staff Report
Page4 of 5
The General Industrial designation allows industrial development with an anticipated floor-area ratio (FAR) of 0.5. This translates as a building of 21,780 square feet on each acre. If we assume manufacturing use at one person per 200 square feet, this would result in potential occupancy by 109 persons, which would be inconsistent with the Compatibility Zone C allowance of75 persons per acre. Using the same assumption, the Compatibility Zone C allowance of 75 persons per acre would only allow for one 15,000 square foot industrial building, which translates as a FAR of0.34.

Compatibility Zone D-Residential: The CMALUCP does not include any Additional Compatibility Policies specific to the Corona Municipal Airport Influence Area. Therefore, the compatibility criteria for Compatibility Zone D are those of the Countywide Plan, which allows residential development at either rural densities not exceeding one dwelling unit per five acres or at urban densities of five or more dwelling units per acre, but which prohibits intermediate densities greater than one dwelling unit per five acres and less than five dwelling unit per net acre.

Residential land use designations in Compatibility Zone D range from Low Density Residential through Low Medium Density Residential, Medium Density Residential, and High Density Residential. The minimum listed density within the Low Medium Density Residential and the Medium Density Residential designations is six dwelling units per adjusted gross acre, and the minimum listed density within the High Density Residential designation is fifteen dwelling units per adjusted gross acre, so these designations are clearly consistent within Compatibility Zone D.

The Low Density Residential designation provides for densities of 3 to 6 dwelling units per acre.

Much of this area (primarily developed in the 1980s) is built out, but there remain a few parcels at least 0.40 acre in area that could potentially be divided into smaller lots. The designation is not totally in conflict with Compatibility Zone D criteria, since there is some overlap between the range of 3 to 6 dwelling units per acre and the Zone D criteria of 5 or more dwelling units per acre.

However, ALUC staff is recommending the addition of a footnote applying to the Low Density Residential designation stating as follows: "Within Airport Compatibility Zone D, new development must have a density of at least 5 dwelling units per acre." Compatibility Zone D - Nonresidential: Properties in Compatibility Zone Dare designated Light Industrial, General Industrial, General Commercial, and Office Professional.

The Light Industrial and General Industrial designations allow industrial development with an anticipated FAR of 0.5. This translates as a building of 21,780 square feet on each acre. If we assume manufacturing use at one person per 200 square feet, this would result in potential occupancy by 109 persons, which would be inconsistent with the Compatibility Zone D allowance of 100 persons per acre. Using the same asswnption, the Compatibility Zone D allowance of 100 persons per acre would only allow for one 20,000 square foot industrial building, which translates as a FAR of 0.45.

The General Commercial designation allows commercial development with an anticipated FAR of

0.5. This translates as a building of21,780 square feet on each acre. Ifwe assume general retail use (not restaurants or theaters, which would have much higher occupancy levels) at one person per 60 Staff Report

Page 5 of 5 ends