July 19, 2023
CITY PARK
MASTER PLAN
City Council
Presentation
The City Council review
key components of the
draft City Park Masterplan
and provide feedback.
THE ASK
PROJECT PURPOSE
“Redevelop City Park, including a
new full-service, purpose-built
community center.” - Strategic Plan Goal 3
Revisioning City Park as a vibrant,
active gathering place for all
members of the community.
BACKGROUND DATA
COLLECTION
SITE INVENTORY AND ANALYSIS
OPPORTUNITIES AND
CONSTRAINTS
PROFESSIONAL
ANALYSIS
PROJECT WEBSITE
VIRTUAL ONLINE SURVEYS
COMMUNITY POP-UP EVENTS
PROGRAM WORKSHOP
DOOR KNOCKING
OFFERING MARKETING
MATERIAL IN ENGLISH AND
SPANISH
COMMUNITY
OUTREACH
CONSENSUS BUBBLE DIAGRAM
PRELIMINARY PLAN
PRELIMINARY DESIGN OPTIONS
FINAL RECOMMENDATIONS TO
CITY COUNCIL
MASTER PLAN
PROJECT TIMELINE
Top Community Desires
1. Walking Trails
2. Playgrounds
3. Picnic Shelters / Pavilions
4. Botanical Garden or Arboretum
5. Performance or Event Space
6. Community or Recreation Building
7. Splashpad
8. Aquatic Center
9. Multi-Use Sports Field
COMMUNITY VOICE
Corona
Founder’s
Monument
Existing
Stone to be
Salvaged &
Repurposed
CHPS
Historic Site
Marker #23
Historic
Farm
Equipment
HISTORY
Total Existing Trees: 384
- Existing Trees in Poor/Fair Condition to be Removed: 20 - Existing Trees to be Removed for Site Improvements: 169 + Existing Trees to be Relocated: 38
+ Existing/Historic Trees Preserved: 157
+ Proposed New Trees: 189
Total Trees: 384
HISTORY
SITE ANALYSIS
PROGRAM WORKSHOP – Bubble Diagram
REFINED BUBBLE DIAGRAM
MASSING PLAN
TRAILS OPPORTUNITIES PLAN
PROGRAM ELEMENTS
Aquatics Building (single-story)
with Pool Equipment room, restrooms,
and outdoor showers
Recreational pool (25yd x 25m)
with beach entry and dedicated
diving area – 12,000 S.F.
Activity Pool with waterslide and
recirculating ‘lazy river’ – 3,685 S.F.
Spa – 250 S.F.
Spectator bleacher seating with
shade structures
AQUATICS
PROGRAM ELEMENTS
Iconic Splash Pad – 10,000 S.F.
Splash Pad restroom building with
outdoor showers
Universal Playground (accessible and
inclusive to all abilities) – 12,500 S.F.
SPLASH PAD & PLAGROUND
PROGRAM ELEMENTS
Community Canvas – 150,000 S.F.
Large gathering lawn located at the
heart of the park for community
events, concerts in the park, sporting
events, etc.
¼ Mile perimeter walking loop/trail
Event stage -1,200 S.F.
MULTI-USE FIELD
PROGRAM ELEMENTS
Two (2) Community Buildings
totaling 40,000 S.F.
- Two-story buildings with roof decks
overlooking the Community Canvas
- Large outdoor courtyard spaces for
events/rental space
COMMUNITY BUILDINGS
PROGRAM ELEMENTS
All-wheel Plaza – 20,000 S.F.
Plaza for Community Events/
Food Truck vendors
Central Fountain with
prominent location for the
Corona Founder’s
Monument
Pedestrian Promenade
ALL WHEEL PLAZA
Aquatics Building (10,000 S.F.) – 50
Recreation Pool (12,000 S.F.) – 48
Activity Pool (3,685 S.F.) – 15
Spa (250 S.F.) – 1
Splash Pad (10,000 S.F.) – 40
Upgraded Playground (12,500 S.F.) – 2
Upgraded Restroom Buildings - 1
Plaza – 2
Botanical Garden (25,000 S.F.) - 3
Total Recommended
Spaces: 162
Community Buildings (40,000 S.F.) – 200
Upgraded Skate Park – 2
Existing Basketball / Volleyball Courts – 3
Plazas/Courtyards – 24
Walking Paths – 4
Botanical Garden (25,000 S.F.) - 3
Total Recommended
Spaces: 236
Proposed on-site parking: 340
+ Proposed on-street parking: 58
Total Proposed Parking: 398 spaces
*based on Riverside County Code of Ordinances
86 Spaces
86 Spaces
28 Spaces 140 Spaces
Transit
Stop
Transit
Stop
PARKING
Existing on-site parking: 175
+ Existing on-street parking: 56
Total Existing Parking: 231 spaces
CASE STUDY – FULLERTON
CASE STUDY – MISSION VIEJO
CONCEPTUAL RENDERINGS
July 19, 2023
CITY PARK
MASTER PLAN
City Council
Presentation