City of Corona
Staff Report
400 S. Vicentia Ave.
Corona, CA 92882
File #: 23-0556
PLANNING AND HOUSING COMMISSION STAFF REPORT
DATE: 07/10/2023
TO: Honorable Chair and Commissioners
FROM: Planning & Development Department
APPLICATION REQUEST:
CUP2023-0002: Conditional Use Permit application to develop 50 apartment units on 2.96 acres, located on the west side of Temescal Canyon Road and on the north and south sides of Fashion Drive, in the Commercial designation of the Dos Lagos Specific Plan. (Applicant: Pat Tritz of Rexco Development, 2518 N. Santiago Blvd., Orange, CA 92862)
RECOMMENDED ACTION:
That the Planning and Housing Commission adopt the Addendum to the adopted Mitigated Negative Declaration and Mitigation Monitoring Plan and Resolution No. 2612 GRANTING CUP2023- 0002, based on the findings contained in the staff report and conditions of approval.
PROJECT SITE SUMMARY
Area of Property: 2.96 Acres
Existing Zoning: C (Commercial) designation within the Dos Lagos Specific Plan Existing General Plan: MU I (Mixed Use, Commercial/Residential) Existing Land Use: Vacant
Proposed Land Use: Multi-Family Residential
Surrounding Zoning / Land Uses:
N: C (Commercial) / Retail Center
E: RR (Resort Residential) / Apartments
S: C (Commercial) / Service Station and convenience store W: C (Commercial) / Apartments
BACKGROUND
The Dos Lagos Specific Plan (”Specific Plan”) established a master plan for over 543 acres located near the southern boundary of the City of Corona. The Specific Plan provides eight (8) land use designations within its 14 planning areas.
The proposed multiple family residential project is located within Planning Area 1 of the Dos Lagos City of Corona Page 1 of 8 Printed on 7/6/2023
powered by Legistar™
File #: 23-0556
The proposed multiple family residential project is located within Planning Area 1 of the Dos Lagos Specific Plan. Planning Area 1 is zoned Commercial (“C”), which allows condominiums and apartments with approval of a conditional use permit (CUP), provided the total yield of multi-family residential units within all of Planning Area 1 does not exceed 450.
The project site, which is currently vacant, was part of a larger commercial project approved in 2018 (Precise Plan PP2018-0003), but not completed. PP2018-0003 approved a four-story hotel; a 2,500- square-foot restaurant with drive-through; 15,100 square feet of restaurant and retail space; and a gas station with a convenience store and drive-through car wash. The commercial site plan approved under PP2018-0003 is provided as Exhibit 3. The hotel, gas station, convenience store and drive-through car wash are constructed and operating. The proposed 50-unit residential project is intended to replace the restaurant with drive-through, and the restaurant/retail space, on the west side of Temescal Canyon Road, and on the north and south sides of Fashion Drive.
PROJECT DESCRIPTION
CUP2023-0002 is a site development plan to establish 50 multiple-family residential units within Planning Area 1 of the Dos Lagos Specific Plan. The proposed residential units are being referred to as Terrano Phase II, as they are intended to be a continuation of the existing 276-unit Terrano Apartment project located to the immediate west of the proposed project, which were approved under CUP16-002. Combined, Terrano Phase I and II comprise a total of 326 units, which is less than the maximum number of 450 units the Dos Lagos Specific Plan allows for Planning Area 1.
Site Plan
The project comprises of seven (7) residential buildings designed as either two-story townhomes or three-story stacked flats. The buildings reflect a modern architectural style. Exhibit 4 illustrates the proposed site plan with building placement, parking locations, and recreation amenities. Access to the project is from Fashion Drive, via Temescal Canyon Road and Dos Lagos Drive. Fashion Drive is an existing private street within the development, and it provides access to the other residential and commercial developments within Planning Area 1.
The proposed project is comprised of two areas, which are bisected by Fashion Drive. The north side of Fashion Drive is comprised of 20 attached two-story townhomes, and approximately 4,288 square feet of recreation area. The recreation area consists of a lawn and a pickleball court. The portion south of Fashion Drive is comprised of 10 attached two-story townhomes, 20 stacked flat units within three-story buildings, and approximately 1,270 square feet of recreation area. The recreation consists of two separate lawn areas. The site plan, as designed, meets the minimum building setback requirements from the streets, and the minimum building separation requirements, as prescribed by the Dos Lagos Specific Plan.
All of the two-story townhomes have either a single-car or two-car garage, with direct access from the garage to each unit’s living area. The buildings with the flat units have single-car garages, but there is no direct access from the garages to the units. Covered (carport) parking and uncovered guest spaces are provided within the north and south portions of the project. Table A summarizes the development proposal.
City of Corona Page 2 of 8 Printed on 7/6/2023
powered by Legistar™
File #: 23-0556
Table A - Summary of Development
Features: North Portion: South Portion:
Number of Buildings 4 (Buildings A & B) 3 (Building C & Buildings D) Story/Building height 2-story / 26’-6” 2-story Building C / 26’-6” 3- story Buildings D / 36’-6”
Unit 20 30
Garage parking space 30 27
Carport parking space 15 18
Uncovered parking space 8 14
Total parking space 53 59
Amenities* Lawn area, Pickleball Court
(4,288 s.f)
Lawn area (1,270 s.f.)
* Residents have access to recreation amenities within Terrano Phases I (existing) and II (proposed).
Floor Plans
The residential units range from one-bedroom stacked units to three-bedroom, two-story townhomes (Exhibit 5). The units have a minimum floor area of 600 square feet or greater, which complies with the Dos Lagos Specific Plan’s minimum living area requirement of 600 square feet for multiple family residential units. Table B provides a summary of the unit types and sizes.
Table B - Summary of Unit Types
Type: Plan/Building: Unit Count: Unit Size (sq. ft.): Bed/Bath:
Flat Plan 1 / Building D* 4 600 1 / 1
Flat Plan 2 / Building D* 6 640 1 / 1
Flat Plan 5 / Building D* 4 830 2 / 2
Flat Plan 6 / Building D* 6 830 2 / 2
Townhome Plan 3 / Buildings A, B, C 10 820 1 / 1
Townhome Plan 4 / Buildings B, C 5 830 1 / 1
Townhome Plan 7 / Buildings A, B, C 10 1085 2 / 2.5
Townhome Plan 8 / Buildings B, C 5 1265 3 / 2.5
* Parking spaces within Buildings D are assigned at time of lease, which may be in the form of enclosed garage spaces or covered carport spaces.
Parking
The project is required to have 90 covered parking spaces and 10 guest parking spaces, for a total of 100 parking spaces. The project meets this requirement by providing 90 covered parking spaces (57 garages and 33 carport covered spaces), and 22 uncovered guest spaces.
The project’s parking is based on the City standards in effect at the time the applicant initially submitted the project’s preliminary application (Development Plan Review application) to the City, which was August 17, 2022. New parking standards didn’t go into effect until October 2, 2022. The old standards used for this project are:
City of Corona Page 3 of 8 Printed on 7/6/2023
powered by Legistar™
File #: 23-0556
· 1.5 covered parking space per unit, plus 1 uncovered guest space per 5 units · 2 covered parking spaces per unit, plus 1 uncovered guest space per 5 units · 2.5 covered parking spaces per unit, plus 1 uncovered guest space per 5 units The project is allowed to use the older parking standards through a provision under California Senate Bill (SB) 330 (Housing Crisis Act of 2019). Under this bill, a residential project is only subject to the development standards in effect at the time the developer submitted his/her preliminary application (DPR application) to the City. The applicant (Rexco) submitted their formal CUP application on February 13, 2023, 180 days from the DPR submittal, which complies with SB 330 deadlines.
For informational purposes only, if the project had been required to provide parking based on the recently adopted parking standards, the project would have been required to provide 96 covered parking spaces plus 10 guest parking spaces. The difference is that the new standard would require an additional six covered parking spaces more than the old standard.
Architecture
The Dos Lagos Specific Plan’s Architectural Design Guidelines (Guidelines) prescribes an Eclectic Mediterranean theme for development within the Specific Plan area. The Guidelines allow variations to accommodate residential design considerations. The residential buildings proposed for the project have smooth stucco walls, accented with stone veneer, metal railings and built-up flat roof. The architecture includes the use of strong color profiles and textured material to create contrast and visual interest; façade articulations to reduce building massing and volume; and deep recessed entryways to create a pedestrian friendly environment. The contemporary, streamlined exteriors present architectural features and a color scheme similar to the Home2 Suites hotel project to the north, and the Terrano Apartments Phase I project to the west. This results in a unified design style within Planning Area 1. Renderings for the proposed project are attached as Exhibit 6.
Access And Circulation
Access to the project site is provided from Fashion Drive, which connects to Temescal Canyon Road and Dos Lagos Drive. The entrance to the north and south portions of the project are located at the west perimeter of the project site. All internal drive aisles within the project are 24 to 28 feet in width. The main drive aisles are 28 feet in width, as required by the Fire Department. The applicant’s Circulation Plan is attached as Exhibit 7.
The section of Temescal Canyon Road adjacent to the project site is fully improved; therefore, no additional improvement within the right-of-way or widening of the street is required with the project.
Landscaping, Fencing, and Walls
Exhibit 8 illustrates the landscape concept and perimeter fencing for the project. The planting schedule includes California-friendly, low and medium water-use materials. The conceptual landscape plan provides larger tree species adjacent to Temescal Canyon Road, which enhances the residential project. Both sides of Fashion Drive leading into the project’s interior road are lined with shade trees, including evergreen African Sumac, deciduous Red Crape Myrtle, and evergreen Brisbane Box. The interior parking areas are enhanced with deciduous Glendora White Crape Myrtle trees, which have bright colors when in bloom; and deciduous London Plane trees, which are fast-growing. The project City of Corona Page 4 of 8 Printed on 7/6/2023
powered by Legistar™
File #: 23-0556
bright colors when in bloom; and deciduous London Plane trees, which are fast-growing. The project also provides a row of planting hedge in front of carport spaces fronting Temescal Canyon Road, to reduce headlight glare impact.
Perimeter fencing, columns and driveway gates have consistent colors and designs as those existing at the Terrano Phase I project. This includes six-foot high tubular steel fencing, and steel framed driveway gates with seven-foot-high stone veneer pilasters. Pedestrian entries next to the driveway gates have perforated steel mesh for enhanced security.
Both areas on the north and south sides of Fashion Drive will have gated entrances. Per the applicant, the gates will be open during the daytime, and will be closed at night.
Site Amenities and Open Space
The project is required to provide a minimum of 100 square feet of common recreation area per unit, per the Dos Lagos Specific Plan. As proposed, the north portion of the project provides a lawn area and a pickleball court, totaling approximately 4,288-square-foot area. The south portion has approximately 1,270 square feet of open lawn area. In total, the project provides 5,558 square feet of recreation area, which complies with the Specific Plan’s requirement. Furthermore, the applicant has stated that residents of the existing Terrano Phase I and the proposed Terrano Phase II will have reciprocal access to each project’s amenities. The Terrano Phase I project has an on-site fitness center, a half basketball court, a barbeque island adjacent to a swimming pool, and a hot tub.
Each of the proposed residential units are required to have a minimum of 50 square feet of private open space. The proposed project provides open space in the form of uncovered decks accessible from each unit’s great room or living room. Units with a Plan 7 and 8 layout have open space in the form of a patio adjacent to each unit’s entrance.
Sign Program
The submitted site plan shows two entry monument signs at the intersection of Temescal Canyon Road and Fashion Drive. Each monument sign will be flanked by a palm trees. This is similar to the landscaping installed at the Encanto Apartment Homes’ entry signs located across Temescal Canyon Road, to the east of the project. Details of the signs have been provided yet. The sign will be reviewed for compliance with the Dos Lagos Specific Plan sign criteria at the time of permit issuance.
ENVIRONMENTAL ANALYSIS
The City approved the original commercial project (PP2018-0003) and adopted a mitigated negative declaration (MND) for the commercial project on August 20, 2018. Staff has prepared an Addendum to the previously adopted MND for the proposed project, pursuant to Section 15164 of the State CEQA (California Environmental Quality Act) Guidelines. The City, as the lead agency, determined that the proposed project and the Addendum demonstrate that the environmental analysis, impacts, and mitigation requirements identified in the previously adopted MND remain substantively unchanged despite project modifications. The proposed project does not raise any new issues or result in impacts not previously analyzed in the prior MND, and none of the conditions described in Section 15162 of the State CEQA Guidelines requiring the preparation of a subsequent MND exist.
The Addendum is attached as Exhibit 11.
City of Corona Page 5 of 8 Printed on 7/6/2023
powered by Legistar™
File #: 23-0556
FISCAL IMPACT
The applicant has paid the applicable application processing fees for the project.
PUBLIC NOTICE AND COMMENTS
A 10-day public notice was mailed to all property owners within a 500-foot radius of the project site, as well as advertised in the Sentinel Weekly News, and posted at the project site. As of the preparation of this report, staff has not received any correspondence regarding the proposed project.
STAFF ANALYSIS
CUP2023-0002 is the last undeveloped site within Planning Area 1. Due to change in market conditions, the applicant is proposing to develop 50 multi-family units in place of the approved restaurant and retail uses previous approved for the site under PP2018-0003. Located along both sides of Fashion Drive, the proposed multi-family residential use allows residents to be less car dependent and encourages pedestrian connectivity with recreational amenities and neighborhood serving commercial uses, which are within walking distance. The interior roads within Planning Area 1 provide safe sidewalks and landscaping buffer, creating a friendly village environment that facilitates people movements within Planning Area 1. The design of the proposed project complies with the minimum standards of the Dos Lagos Specific Plan, and is consistent and compatible with existing projects nearby.
The Planning and Development Department recommends approval of CUP2023-0003 based on the following findings of approval and the recommended Conditions of Approval, which are attached as Exhibit 9.
FINDINGS OF APPROVAL FOR CUP2023-0002
1. The project was previously evaluated under a Mitigated Negative Declaration (MND) which was adopted by the City Council on August 20, 2018. Pursuant to Section 15164 if the State CEQA (California Environmental Quality Act) Guidelines, the City as the lead agency determined that the proposed project, and the Addendum to the previously adopted MND, demonstrate that the environmental analysis, impacts and mitigation requirements identified in the previously adopted MND remain substantively unchanged despite project modifications.
The proposed project does not raise any new environmental issues or result in impacts not previously analyzed in the prior MND, and none of the conditions requiring the preparation of a subsequent MND, described in Section 15162 of the State CEQA Guidelines, exist.
2. All the conditions necessary for granting a Conditional Use Permit as set forth in Section
17.92.110 of the Corona Municipal Code do exist in reference to CUP2023-0002 for the following reasons:
a. The proposed residential use at the proposed location within Planning Area 1 of the Dos Lagos Specific Plan will not be detrimental to the public health, safety, convenience and general welfare, and will be in harmony with the various elements and objectives in the City’s General Plan, because the proposed project adheres to the permitted land use and applicable development standards prescribed by the Dos Lagos Specific Plan, and all necessary improvements will be, or conditioned to be, constructed to support City of Corona Page 6 of 8 Printed on 7/6/2023 powered by Legistar™
File #: 23-0556
and all necessary improvements will be, or conditioned to be, constructed to support the residential development.
b. The proposed residential use at the proposed location is not detrimental to other existing and permitted uses within Planning Area 1 of the Dos Lagos Specific Plan, and relates properly to existing and proposed streets and highways, because the Dos Lagos Specific Plan identifies the subject site (Planning Area 1) as appropriate for mixed use development, which may include up to 450 multiple family residential units. The existing Terrano Phase I project consists of 276 dwelling units, such that the 50 proposed units will yield a total of 326 dwelling units within Planning Area 1.
Furthermore, the project site is bounded on three sides by roadways and interior roads that have been previously improved, providing access to both sides of the project.
3. The proposal is consistent with the General Plan for the following reasons:
a. The proposed project is consistent with the General Plan Mixed Use I (Commercial/Residential) designation, which promotes a mix of commercial and residential development up to a Floor Area Ratio limit of 2.0 for either retail commercial and office uses or an integrated mix of commercial and residential, vertical or horizontal, on the same site. The proposed residential project combined with the hotel, convenience store and carwash that were approved and built under the original entitlement (PP2018-0003) have a combined Floor Area Ratio of 0.17, which does not exceed the General Plan’s Floor Area Ratio limit of 2.0. b. The proposed project is consistent with General Plan Goal LU-11 because it contributes to having a vital and active mixed-use district that provides housing in proximity to commercial uses, services, entertainment and public transit portals. c. The proposed project implements General Plan Policy LU-14.1, which is to accommodate the development of properties for mixed use projects that integrate housing with retail, office, and other uses either in the same structure or on the same site.
d. The proposed project implements General Plan Policy 1.13.8 by promoting a high level of architectural quality and livability with multi-family residential development.
4. The proposal is consistent with the C (Commercial) designation of the Dos Lagos Specific Plan (SP99-03) for the following reasons:
a. The proposed multi-family residential use is permitted in Planning Area 1 of the Dos Lagos Specific Plan and has a density of 16.89 dwelling units per acre, which does not exceed the density limit of 36 dwelling units per acre established by the General Plan and Dos Lagos Specific Plan for residential condominium/apartments. b. The proposed project is designed to adhere to the development standards and City of Corona Page 7 of 8 Printed on 7/6/2023
powered by Legistar™
File #: 23-0556
b. The proposed project is designed to adhere to the development standards and applicable design guidelines imposed by the Dos Lagos Specific Plan.
PREPARED BY: EVA CHOI, ASSOCIATE PLANNER
REVIEWED BY: SANDRA YANG, SENIOR PLANNER
REVIEWED BY: JAY EASTMAN, PLANNING MANAGER
SUBMITTED BY: JOANNE COLETTA, PLANNING & DEVELOPMENT DIRECTOR EXHIBITS:
1. Resolution No. 2612
2. Locational and zoning map
3. Site Plan, approved under PP2018-0003
4. Site plan, proposed for CUP2023-0002
5. Floor Plans
6. Elevation renderings and material palette
7. Circulation plan
8. Conceptual landscape and fence plan
9. Conditions of Approval
10.Applicant’s letter dated May 11, 2023
11.Environmental documentation
City of Corona Page 8 of 8 Printed on 7/6/2023
powered by Legistar™
RESOLUTION NO. 2612
APPLICATION NUMBER: CUP2023-0002
A RESOLUTION OF THE PLANNING AND HOUSING
COMMISSION OF THE CITY OF CORONA,
CALIFORNIA, GRANTING A CONDITIONAL USE
PERMIT TO DEVELOP 50 APARTMENT UNITS ON 2.96
ACRES, LOCATED ON THE WEST SIDE OF TEMESCAL
CANYON ROAD AND ON THE NORTH AND SOUTH
SIDES OF FASHION DRIVE, IN THE COMMERCIAL
DESIGNATION OF THE DOS LAGOS SPECIFIC PLAN.
(PAT TRITZ OF REXCO DEVELOPMENT)
WHEREAS, the application to the City of Corona, California, for a Conditional Use Permit under the provisions of Chapter 17.92 in the Corona Municipal Code, has been duly submitted to said City's Planning and Housing Commission for a 50 unit apartment development on 2.96 acres, located on the west side of Temescal Canyon Road and on the north and south sides of Fashion Drive, in the Commercial Designation of the Dos Lagos Specific Plan; and WHEREAS, the City of Corona, California, City Council previously approved a Precise Plan application (PP2018-0003) on August 20, 2018 for the project site and surrounding properties, which included the adoption of a Mitigated Negative Declaration (MND); and WHEREAS, the Applicant’s 50 unit development as proposed by CUP2023- 0002 is to be located on a vacant, undeveloped property previously entitled by PP2018-0003 for restaurant and retail uses; and
WHEREAS, an Addendum to the PP2018-0003 MND was prepared in order to evaluate the land uses proposed by CUP2023-0002, pursuant to California Environmental Quality Act (CEQA) Guidelines section 15164; and
WHEREAS, the Planning and Housing Commission held a noticed public hearing for CUP2023-0002 on July 10, 2023, as required by law; and
WHEREAS, at the conclusion of the hearing the Planning and Housing Commission, pursuant to CEQA Guidelines Section 15164, considered the Addendum to the RESOLUTION NO. 2612
APPLICATION NO. CUP2023-0002
PAGE | 2
previously approved Mitigated Negative Declaration (MND) that was prepared for PP2018- 0003, and based on the information contained in the Addendum, the initial study and the administrative records for this project, including all written and oral evidence provided during the comment period and presented to the Planning and Housing Commission, the Commission finds that none of the conditions described in CEQA Guidelines Section 15162 have occurred, and a subsequent MND does not need to be prepared; and
WHEREAS, after close of said hearing, the Commission by formal action, found that all the conditions necessary to granting a Conditional Use Permit as set forth in Corona Municipal Code Section 17.92.110 do exist in reference to CUP2023-0002, based on the evidence presented to the Commission during said hearing; and WHEREAS, the Planning and Housing Commission based its approval of the CUP2023-0002 on certain conditions of approval and the findings set forth below, and adoption of the MND Addendum.
NOW, THEREFORE, THE PLANNING AND HOUSING COMMISSION
OF THE CITY OF CORONA, CALIFORNIA, DOES ORDAIN AS FOLLOWS:
SECTION 1. CEQA Findings. The project was previously evaluated under a Mitigated Negative Declaration (MND) which was adopted by the City Council on August 20, 2018. Pursuant to Section 15164 of the State CEQA (California Environmental Quality Act) Guidelines, the City as the lead agency has reviewed and considered the Addendum to the previously adopted MND, and determined that the environmental analysis, impacts and mitigation requirements identified in the previously adopted MND remain substantively unchanged despite project modifications, the proposed project does not raise any new environmental issues or result in impacts not previously analyzed in the prior MND, and none of the conditions requiring the preparation of a Subsequent MND, as described in Section 15162 of the State CEQA Guidelines, exist.
SECTION 2. Conditional Use Permit Findings. Pursuant to Corona Municipal Code (“CMC”) section 17.92.110 and based on the entire record before the Planning and Housing Commission, including all written and oral evidence presented to the Commission, the Commission hereby makes and adopts the following findings:
1. The City of Corona has The City of Corona has determined the prepared Amendment to the previously adopted PP2018-0003 Mitigated Negative Declaration (MND) is appropriate and adequate, pursuant to Section 15164 of the State CEQA Guidelines, as the proposed project does not raise any new environmental issues or result in impacts not previously analyzed in the prior MND, and none of the conditions requiring the preparation of a Subsequent MND, as described in Section 15162 of the State CEQA Guidelines, exist.
2. All the conditions necessary for granting a Conditional Use Permit as set forth in Section
17.92.110 of the Corona Municipal Code do exist in reference to CUP2023-0002 for the RESOLUTION NO. 2612
APPLICATION NO. CUP2023-0002
PAGE | 3
following reasons:
a. The proposed residential use at the proposed location within Planning Area 1 of the Dos Lagos Specific Plan will not be detrimental to the public health, safety, convenience and general welfare, and will be in harmony with the various elements and objectives in the City’s General Plan, because the proposed project adheres to the permitted land use and applicable development standards prescribed by the Dos Lagos Specific Plan, and all necessary improvements will be, or conditioned to be, constructed to support the residential development.
b. The proposed residential use at the proposed location is not detrimental to other existing and permitted uses within Planning Area 1 of the Dos Lagos Specific Plan, and relates properly to existing and proposed streets and highways, because the Dos Lagos Specific Plan identifies the subject site (Planning Area 1) as appropriate for mixed use development, which may include up to 450 multiple family residential units. The existing Terrano Phase I project consists of 276 dwelling units, such that the 50 proposed units will yield a total of 326 dwelling units within Planning Area 1.
Furthermore, the project site is bounded on three sides by roadways and interior roads that have been previously improved, providing access to both sides of the project.
c. The project is subject to the Conditions of Approval attached as Exhibit 9, which are necessary and desirable for the purpose of protecting public health, safety, convenience, and general welfare of the public, in accordance with the intent and purpose of the City’s zoning regulations.
3. The proposal is consistent with the General Plan for the following reasons:
a. CUP2023-0002 is consistent with the project site’s General Plan landuse designation of Mixed Use I (Commercial/Residential) designation, which promotes a mix of commercial and residential development up to a Floor Area Ratio limit of 2.0 for either retail commercial and office uses or an integrated mix of commercial and residential, vertical or horizontal, on the same site. The proposed residential project combined with the hotel, convenience store and carwash that were approved and built under the original entitlement (PP2018-0003) have a combined Floor Area Ratio of 0.17, which does not exceed the General Plan’s Floor Area Ratio limit of
2.0. b. The proposed project is consistent with General Plan Goal LU-11 because it contributes to having a vital and active mixed-use district that provides housing in proximity to commercial uses, services, entertainment and public transit portals. c. The proposed project implements General Plan Policy LU-14.1, which is to accommodate the development of properties for mixed use projects that integrate housing with retail, office, and other uses either in the same structure or on the same site.
RESOLUTION NO. 2612
APPLICATION NO. CUP2023-0002
PAGE | 4
d. The proposed project implements General Plan Policy 1.13.8 by promoting a high level of architectural quality and livability with multi-family residential development.
4. The proposal is consistent with the C (Commercial) designation of the Dos Lagos Specific Plan (SP99-03) for the following reasons:
a. The proposed multi-family residential use is permitted in Planning Area 1 of the Dos Lagos Specific Plan and has a density of 16.89 dwelling units per acre, which does not exceed the density limit of 36 dwelling units per acre established by the General Plan and Dos Lagos Specific Plan for residential condominium/apartments.
b. The proposed project is designed to adhere to the development standards and applicable design guidelines imposed by the Dos Lagos Specific Plan.
BE IT FURTHER RESOLVED that a copy of this Resolution be delivered to the City Clerk of said City and a copy thereof be sent to the applicant therefore at the address of said applicant as set forth in the application for said Conditional Use Permit.
Date: 07/06/2023 ®
LOCATIONAL & ZONING MAP
CUP2023-0002
Zoning Legend
C - Commercial
G - Golf
RR - Resort Residential
Text
Dos Lagos Dr
Interstate
15 Temescal
Canyon
Rd
Fashion Dr
Fashion
Dr
Project Site: North Portion
Project Site: South Portion
C
RR
RR
G
Unincorporated Riverside
County Jurisdiction
C
C
Site Plan approved on
October 2, 2018 under
Precise Plan 2018-0003.
EXISTING
LANDSCAPE
BY
COMMERCIAL
HOA, TYP.
. =--::,,::
LANDSCAPE CONCEPT:
This landscape will consist of California-Friendly, low and medium water use plant material. All plants have been chosen from the low or medium water use category according to WUCOLS. Plants have been chosen to create a uniform theme across the site consisting of formal massings of attractive and textural sub-tropical, lush plantings backed by evergreen dipped and manicured hedges against the building and screening the parking lots.
CAJk..CQ: ROAO
Shade trees will be used to provide shade coverage for much of the site.
Large accent trees are located at major project entries and where enhanced planting areas are located to better welcome visitors.
Maintenance and longevity of plant material has been taken into consideration. Root panels and barriers will be utilized on aU trees necessary, consistent with all standards and specifications. A 3" layer of bark mulch will be used in all landscape areas. All landscape areas will confonn to the current City of Corona Landscape Guidelines.
PROJECT SITE
VICINITY MA
NOT TO SCALE
Q
N.T.S.
IRRIGATION CONCEPT:
The irrigation design will incorporate the latest in smart irrigation technologies. All new planter areas will include drip line. All planters will use drip line with an irrigation efficiency of .8. A smart irrigation controller wlth a rain shut off device will also be incorporated. Bark mulch wifl be used to retain moisture and reduce evaporation and an irrigation schedule will be provided ta program the controller. Two irrigation schedules shall be prepared, one for plant establishment and one for after plant establishment.
AU new irrigation systems will comply with all current City of Corona Landscape Guidelines.
TERRANO II APARTMENTS
bmla
L A N D S C A P E
ARCHITECTURE
310 NORTH JOY STREET I CORONA, CA 92879
T: 951.737.1124 I F: 951.737.6551
CITY OF CORONA TREE DESIGN GUIDEUNES
1. Shade trees must be provided for parking lot and open space areas. the palette shall include a balance of evergreen and deciduous treas.
2. A minimum of twenty four (24) inch box specimen trees shall be provided on the site based on the following formula: one 24-inch box specimen tree for every 10,000 sq. fl. of gross building area on Iha property.
3. A mix of tree sizes shall include at least: 25% 15-gallon trees, 70% 24-inch box Irees, and 5% 36-inch box trees.
4. A minimum of one (24)-inch box lree shall be provided for every twenly finear feet of all planter areas of four feet to ten feet wide, or one tree for every three parking stalls, whichever tree count is greater.
5. A minimum of thirty-six inch box accent trees (single or multi-trunk specimens) or 12 foot (brown trunk) palms are required on all oorner planters including all vehicular entries and major corner intersections of project area. They shall also be required at building entries and other public spaces, such as plazas, courtyards, or patio areas.
6. A minimum of one 24-inch box tree shall be planted for every five hundred square feet of landscaping area in all other areas.
7. Root panels and linear barriers are required for all trees planted within a pari<way or within 8-feet of any walking or driveable surface in accordance with the landscape and irrigation standard plans and specifications.
8. Trees shall not be placed where !hey inlerfere wilh site drainage or overhead and underground utilities. all utilities shall be identified on the base plan.
ISTING
NDSCAPE
OMMERCIAL
---
PLANTING SCHEDULE
BOTANICAL I COMMON NAME
LAGERSTROEMIA INDICA "GLENDORA WHITE"
GLENDORA WHITE CRAPE MYRTLE MUL Tl-TRUNK
LAGERSTROEMIA X "TUSCARORA"
RED CRAPE MYRTLE
PHOENIX DACTYLIFERA
DATE PALM
PLATANUS RACEMOSA
CALIFORNIA SYCAMORE
PLATANUS X ACERIFOLIA "BLOODGOOD"
LONDON PLANE TREE
RHUS LANCEA
AFRICAN SUMAC
TRISTANIA CONFERTA
BRISBANE BOX
BOTANICAL I COMMON NAME AGAVE DESMETlANA "VARIEGA TA"
\IARIEGAlEO AGAIJ
AGAVE X ·eLUE. fl.AME
BLUE FLAME AGAVE
C/'ill!31EMON X "LITTLE JO
DWARF C AUJSTEMON
Cl YTOSTOMA CALLISTEGIOIDES
I/IOI.ET TRUMPET VINE
DIANELLA lASMAN•CA -VAR•EGA1 A
VARIEGATED FLAX LIL
LIGUSTRUM JAf'ONICUM TEXANUM
WAX l.EAf PRIVE I
ROSA FLORIBUNDA ICEBERG
ICEBERG ROSE
STRELIT?IA N<COLAI
GIANT Bl OF PAR�OISE $TREUTZIA REGINAE
BIRD OF PARADISE
BOTANICAL/ COMMON NAME
CARISSA 111,'\CROCARPA GREEN CARPET'
LOW GROWING r-,ATA.L PLUM
LANTANA X
. 'EW GOLD.
Nl:W GOLD LANTANA
RHl<P!-ilO�EPIS INDICA 'BALLERINA" BAI.LE.RINA INDIAN HAWTHORN ROSA. X NOARE'
FLOWER CARPET RED GROUNDCOVER ROSE
SO I ANJCAL/ COMMON NAME
FESTIJCA A.RUNDINACEA
DWARF TALL FESCUE 'MARATHON II"
AMENITIES NOTE:
SIZE WUCOLS QTY
36"BOX M 7
36"BOX M 24
18" BTH 10
36"BOX M 11
36"BOX M
15 GAL L
24"BOX M
SIZE WUCOLS
SGAL L
SGAL L
SGAL L
SGAL M
5GAL M
SGAL M
5GAL M
15GAL M
5GAL M
SIZE WUCOLS
1GAL@
L
24"O.C.
5GAL@
L
30"O.C.
5GAL@ M
24"O.C.
2GAL@ M 24"O.C.
SIZE WUCOLS
SOD H
12 20
j I WAWlllffaciENT'LAND&CANWORKSH&T -'····-··-·-I'
PROJECT: "TTetl'W'IO ..-f!Wlta rr-------·-��·-···1· ·•·•-•«J ... _.~---· i ... DAl!:: I 211120z i
Thls.w..W...15flllleutQti•�.....-llldlll•raquhllHNatrif1Ml.sldsup,i,Dc:lt___,......_ ���t�-�:i:�ff!�:�:
··- ·················1
···s:::;·-•···········1
········•··•·····•··•···1
•·····•····· r·
the occupants of the existing Terrano I and the proposed Terrano II will have equal access to recreation areas within both project sites. --· -··
-·-- ----• .... Landarap.Ano,t .,.,, ........ o
.., ....... &'ftd•Mlffllt• (PAlq {sq.ft,) .... --· U.acrlptl11111i• YH(STWUl1
1.-0U:llrl.aftdscl.MANH ,_.,,. ... 0.2 .... D.81 - 0 0 ' u.. .......... - OA .... 0.81 .... - .. , .. •m011 UM-law-
,u,.,_. ..... ..._.,,
.!Md.al LlndSlcaM NIH
,, __ ' 2.650 ,.... m.tm
,-·--"" I 0
-- '---
-·--
Ll5Q z- ..... ou;• Muh.umAIIDwedWatarAllowiarc. M\,11
��--·
1n• .. • .. ••�••••-••.a1,,.a�1o, ..... , .. ,...,..,
.... ··-··· ........ i. .••..
... (
.. 1-·- - ---;•--+---
--+--. . .. ; --·
·
_
-·r
·
·
,_ . .,, .......... _,, __ ................................. -, ...... -...... , .. :�.--..:.... --·-- .... :.. - rn,,,, NORTH 0' 30' 60' 90'
CONCEPTUAL LANDSCAPE PLAN
PREPARED FOR REXCO DEVELOPMENT
Details:
LIST OF CONDITIONS
DEPARTMENT CONTACT
BUILDING
1. Construction activity shall not occur between the hours of 8:00 pm to 7:00 am, Monday thru Saturday and 6:00 pm to 10:00 am on Sundays and Federal Holidays.
2. Roofing material shall be Class A.
3. Pool area shall be enclosed with fencing in compliance with Corona Municipal Code (CMC) Sec 15.24.
4. Submit pool plans to Riverside County Health Department for approval.
5. Submit five (5) complete sets of plans including the following - * Plot Plan * Foundation Plan * Floor Plan * Ceiling and roof framing plan * Electrical Plans (electrical service shall be underground per Corona Municipal Code Section 15.06), including size of main switch, number and size of service entrance conductors, circuit schedule and demand load. * Plumbing and sewer plan, isometric, including underground diagram, water piping diagram, sewer or septic tank location, fixture units, gas piping and vents, heating and air conditioning diagram. * Landscape and Irrigation plans; Submit four (4) complete sets detached from building plans. Landscape Maintenance District plans shall be submitted directly to the Planning and Development Department, Development Services Division. Landscape plans shall be approved prior to the issuance of any Building Permits.
6. Submit two (2) sets of structural calculations, energy conservation calculations and soils reports. Architects/Engineers stamp and wet signature is required prior to submittal of plan check.
7. Separate permits are required for all fences, walls and paving.
8. Comply with the Corona Burglary Ordinance # 15.52. Copies are available at the Building Department counter.
9. All contractors must show proof of State and City licenses, and workmen's compensation insurance to the City prior to the issuance of permits.
10. Business' shall not open for operation prior to posting of Certificate of Occupancy issued by the Building Department.
11. In addition, refer to original DPR comments already received and acknowledged.
FIRE Cindi Schmitz
1. Site plan shall show a minimum drive width of 28 feet.
2. Utility plan shall show fire hydrants spacing on Temescal Canyon Road at a minimum of 250 feet.
PLANNING Eva Choi
1. The project shall comply with all applicable requirements of the Corona Municipal Code (CMC) and ordinances, and the Dos Lagos Specific Plan, including the payment of all required fees.
Project Number: CUP2023-0002
Applied: 2/13/2023 Approved:
Closed: Expired:
Status: RECEIVED
Parent Project:
Develop 50 apartment units on 2.96 acres in Dos Lagos.
Site Address: Fashion Dr & Temescal Canyon Rd ,
REXCO, LLC
2518 N. SANTIAGO AVE ORANGE CA, 92867
Description:
Applicant:
CUP2023-0002 1 of 6 (Continued on next page)
Project Conditions
City of Corona
PLANNING Eva Choi
2. To the fullest extent permitted by law, the applicant shall defend, indemnify and hold the City of Corona and its directors, officials, officers, employees, volunteers and agents free and harmless from any and all claims, demands, causes of action, proceedings, costs, expenses, liabilities, losses, damages or injuries of any kind, in law or equity, in any manner arising out of, pertaining to, or incident to any attack against or attempt to challenge, set aside, void or annul any approval, decision or other action of the City of Corona, whether such approval, decision or other action was by its City Council, Planning and Housing Commission or other board, director, official, officer, employee, volunteer or agent. To the extent that Government Code Section 66474.9 applies, the City will promptly notify the applicant of any claim, action or proceeding made known to the City to which Government Code Section 66474.9 applies and the City will fully cooperate in the defense. The Applicant's obligations hereunder shall include, without limitation, the payment of any and all damages, consultant and expert fees, and attorney's fees and other related costs and expenses. The City shall have the right to retain such legal counsel as the City deems necessary and appropriate.
3. Nothing herein shall be construed to require City to defend any attack against or attempt to challenge, set aside, void or annul any such City approval, decision or other action. If at any time Applicant chooses not to defend (or continue to defend) any attack against or attempt to challenge, set aside, void or annul any such City approval, decision or other action, the City may choose, in its sole discretion, to defend or not defend any such action. In the event that the City decides not to defend or continue the defense, Applicant shall be obligated to reimburse City for any and all costs, fees, penalties or damages associated with dismissing the action or proceeding. If at any time both the Applicant and the City choose not to defend (or continue to defend) any action noted herein, all subject City approvals, decisions or other actions shall be null and void. The Applicant shall be required to enter into any reimbursement agreement deemed necessary by the City to effectuate the terms of this condition.
4. This permit hereby allowed is conditional upon the privileges being utilized by the securing of the first permit thereof, or compliance with all conditions on the granting of this conditional use permit within two (2) years after the effective date thereof, and if they are not utilized, or construction work is not begun within said time and carried on diligently to completion, this authorization shall become void, and any privilege or permit granted shall be deemed to have lapsed.
5. The applicant or his successor in interest shall comply with the Mitigation Monitoring and Reporting Program adopted for PP2018-0003 and CUP2018-0007.
6. All landscape plans shall be prepared by a licensed professional. Plans shall be prepared in accordance with the Landscape Architectural Plans checklist and the Corona Municipal Code (available at the Community Development Department).
7. Separate landscape plans shall be submitted to the Building Division at the time of building plan check and shall be approved prior to the issuance of a building permit. At the time of submittal, the developer shall pay the Building Division's plan check submittal fee for landscape plans. Additionally, the developer shall submit a separate landscape deposit in the amount of $5,000 directly to the Planning Division for third-party plan check services related to the landscape plans. Any funds remaining from the deposit will be returned to the developer upon completion of the project.
8. The project shall provide trash enclosures in compliance with Section 17.79.050.
9. The developer shall submit separate plans for the perimeter fencing and gates for plan check and permits.
10. All landscaping and fencing shall be installed per the approved plans prior to the issuance of a Certificate of Occupancy.
11. The project is subject to the Riverside County's Multiple Species Habitat Conservation Plan fee for residential development (Density Between 8.0 and 14.0 Dwelling Units Per Acre). The developer shall pay the fee rate that is in effect at the time of payment. Payment shall be made prior to the issuance of a building.
PUBLIC WORKS Noe Herrera
1. The Public Works, Planning and Development, and Utilities Department comments for the subject application shall be completed at no cost to any government agency. All questions regarding the intent of the comments shall be referred to the Planning and Development Department, Development Services Division. Should a conflict arise between City of Corona standards and design criteria and any other standards and design criteria, City of Corona standards and design criteria shall prevail.
2. The developer shall comply with the State of California Subdivision Map Act and all applicable City ordinances and resolutions.
3. Prior to issuance of grading permit, the applicant shall demonstrate to the satisfaction of the Public Works Director that the proposed project will not unreasonably interfere with the use of any easement holder of the property.
CUP2023-0002 2 of 6 (Continued on next page)
Project Conditions
City of Corona
PUBLIC WORKS Noe Herrera
4. All improvement and grading plans shall be drawn on twenty-four (24) inch by thirty-six (36) inch Mylar and signed by a registered civil engineer or other registered/licensed professional as required.
5. The submitted site plan shall correctly show all existing easements, traveled ways, and drainage courses. Any omission or misrepresentation of these documents may require said site plan to be resubmitted for further consideration.
6. In the event that off-site right-of-way or easements are required for the City of Corona master plan facilities to comply with these conditions of approval, the developer is required to secure such right-of-way or easements at no cost to the City.
7. All existing and new utilities adjacent to and on-site shall be placed underground in accordance with City of Corona ordinances.
8. Prior to issuance of a Certificate of Occupancy, the developer shall cause the engineer of record to submit project base line work for all layers in AutoCAD DXF format on Compact Disc (CD) to the Public Works Department. If the required files are unavailable, the developer shall pay a scanning fee to cover the cost of scanning the as-built plans.
9. The developer shall monitor, supervise and control all construction and construction related activities to prevent them from causing a public nuisance including, but not limited to, insuring strict adherence to the following: a) Removal of dirt, debris or other construction material deposited on any public street no later than the end of each working day. (b) Construction operations, including building related activities and deliveries, shall be restricted to Monday through Saturday from 7:00 a.m. to 8:00 p.m., excluding holidays, and from 10:00 a.m. to 6:00 p.m. on Sundays and holidays, in accordance with City Municipal Code 15.04.060, unless otherwise extended or shortened by the Public Works Director or Building Official. (c) The construction site shall accommodate the parking of all motor vehicles used by persons working at or providing deliveries to the site. Violation of any condition or restriction or prohibition set forth in these conditions shall subject the owner, applicant, developer or contractor(s) to remedies as noted in the City Municipal Code. In addition, the Public Works Director or Building Official may suspend all construction related activities for violation of any condition, restriction or prohibition set forth in these conditions until such time as it has been determined that all operations and activities are in conformance with these conditions.
10. Prior to building permit issuance, the developer shall address the maintenance of the shared facilities and common areas by recording a reciprocal easement agreement, establishing a property owners association and recording the associated covenants, conditions, and restrictions (CC&Rs), or by providing sufficient easements and/ or agreements to the satisfaction of the Planning and Development Director. The recorded or final documents shall address all private utilities, drainage, landscaping, retaining walls, driveways, and pavement shared between this development, the hotel parcel to the north, and the fuel service station parcel to the south.
11. Prior to issuance of a building permit, the developer shall finish the construction or post security guaranteeing the construction of all public improvements. Said improvements shall include, but are not limited to, the following:
a) All drainage facilities, including the relocation of the existing 24-inch and 36-inch storm drain lines through the site. b) All required grading, including erosion control.
c) All required sewer, water, electrical, and reclaimed water facilities. d) All under grounding of overhead utilities, except for cables greater than 32k volts.
12. Prior to issuance of a grading permit, all utilities in conflict with the proposed structures shall be relocated within dedicated public easements, including: the existing 36-inch public storm drain located onsite to the north of Fashion Drive and the existing 24-inch public storm drain located onsite to the south of Fashion Drive.
13. Prior to issuance of a building permit, all easements that are excess due to the relocation or abandonment of public facilities shall be vacated, unless otherwise approved by the Planning and Development Director. Easements include but are not limited to:
a) The 20-foot reclaimed water easement located on the north side of the project site b) The 20-foot sewer easement as shown as easement 10 on Parcel Map 37070 c) The 20-foot storm drain easement located to the north of Fashion Drive and to the south of Fashion Drive.
14. All the grading design criteria shall be per City of Corona standards, Corona Municipal Code Title 15 Chapter 15.36 and City Council Ordinance Number 2568, unless otherwise approved by the Public Works Director.
CUP2023-0002 3 of 6 (Continued on next page)
Project Conditions
City of Corona
PUBLIC WORKS Noe Herrera
15. Prior to approval of grading plans, the applicant shall submit two (2) copies of a soils and geologic report prepared by a Registered Engineer to the Planning and Development Department, Development Services Division. The report shall address the soil's stability and geological conditions of the site. If applicable, the report shall also address: deep seated and surficial stability of existing natural slopes; modified natural slopes which are subject to fuel zones; manufactured slopes and stability along proposed daylight lines; minimum required setbacks from structures; locations and length of proposed bench drains, sub-drains or french drains; and any other applicable data necessary to adequately analyze the proposed development.
16. Prior to approval of grading plans, erosion control plans and notes shall be submitted and approved by the Planning and Development Department, Development Services Division.
17. Prior to approval of grading plans, the applicant shall obtain a General Construction Activity Storm Water Permit from the State Water Resources Control Board in compliance with National Pollutant Discharge Elimination System (NPDES) requirements.
Proof of filing a Notice of Intent (NOI) will be required by the City. The WDID # shall be displayed on the title sheet of the grading plans.
18. Prior to approval of grading plans, the applicant shall comply with the Federal Clean Water Act and shall prepare a Storm Water Pollution Prevention Plan (SWPPP). The SWPPP shall be available at the project site for review.
19. Prior to issuance of building permits, the developer shall cause the civil engineer of record and soils engineer of record for the approved grading plans to submit pad certifications and compaction test reports for the subject lots where building permits are requested.
20. Prior to release of grading security, the developer shall cause the civil engineer of record for the approved grading plans to submit a set of as-built grading plans with respect to Water Quality Control facilities.
21. All City of Corona NPDES permit requirements for NPDES and Water Quality Management Plans (WQMP) shall be met per Corona Municipal Code Title 13 Chapter 13.27 and City Council Ordinance Numbers 2291 and 2828 unless otherwise approved by the Public Works Director.
22. Prior to the issuance of a grading permit, a Final WQMP, prepared in substantial conformance with the approved Preliminary WQMP, shall be submitted to the Planning and Development Department, Development Services Division for approval. Upon its final approval, the applicant shall submit one copy on a CD-ROM in PDF format.
23. Prior to issuance of the first Certificate of Occupancy, the applicant shall provide proof of notification to the future homeowners and/or occupants of all non-structural BMPs and educational and training requirements for said BMPs as directed in the approved WQMP.
24. Prior to issuance of Certificate of Occupancy, the applicant shall ensure all structural post construction BMPs identified in the approved project specific Final WQMP are constructed and operational.
25. All the drainage design criteria shall be per City of Corona standards and the Riverside County Flood Control and Water Conservation District standards unless otherwise approved by the Public Works Director.
26. Prior to approval of any improvement plans, the applicant shall submit an updated hydrology study. Said study shall include the existing, interim and the ultimate proposed hydrologic conditions including key elevations, drainage patterns and proposed locations and sizes of all existing and proposed drainage devices. The hydrology study shall present a full breakdown of all the runoff generated on- and off-site.
27. Prior to approval of improvement plans, the improvement plans submitted by the applicant shall address the following: The project drainage design shall be designed to accept and properly convey all on- and off-site drainage flowing on or through the site. The project drainage system design shall protect downstream properties from any damage caused by alteration of drainage patterns such as concentration or diversion of flow. All residential lots shall drain toward an approved water quality or drainage facility. Once onsite drainage has been treated it may continue into an approved public drainage facility.
28. Prior to approval of improvement plans, the improvement plans submitted by the applicant shall include the following:
a) All driveways shall conform to the applicable City of Corona standards and shall be shown on the street improvement plans. b) Under grounding of existing and proposed utility lines. c) All other public improvements shall conform to City of Corona standards.
29. Prior to release of public improvement security, the developer shall cause the civil engineer of record for the approved improvement plans to submit a set of as-built plans for review and approval by the Planning and Development Department, Development Services Division.
CUP2023-0002 4 of 6 (Continued on next page)
Project Conditions
City of Corona
PUBLIC WORKS Noe Herrera
30. Prior to building permit issuance, the applicant shall provide all of the necessary documents and fees needed to annex this project into a City of Corona Community Facilities District (CFD) 2016-1 (Public Services). All assessable parcels therein shall be subject to annual CFD charges (special taxes or assessments). The developer shall be responsible for all costs incurred during annexation into the CFDs.
31. Prior to the issuance of a Certificate of Occupancy, any damage to existing landscape easement areas due to project construction shall be repaired or replaced by the developer, or developer's successors in interest, at no cost to the City of Corona.
32. Prior to issuance of a building permit and/or issuance of a Certificate of Occupancy, the applicant shall pay all development fees, including but not limited to Development Impact Fees (DIF) per City Municipal Code 16.23 and Transportation Uniform Mitigation Fees (TUMF) per City Municipal Code 16.21. Said fees shall be collected at the rate in effect at the time of fee collection as specified by the current City Council fee resolutions and ordinances.
33. All the potable water, reclaimed water, and sewer design criteria shall be per City of Corona Utilities Department standards and Riverside County Department of Health Services Standards unless otherwise approved by the Public Works and Utilities Department Directors.
34. Prior to issuance of any building permits, including model home permits, a domestic water and fire flow system shall be approved by the Public Works Department and constructed by the developer, to the satisfaction of the Public Works Director and Fire Chief.
35. Prior to issuance of the first Certificate of Occupancy, all weather access road(s) shall be provided to all sewer manholes not located within public right-of-way.
36. Prior to improvement plans approval, the applicant shall ensure that all water meters, fire hydrants or other water appurtenances shall not be located within a drive aisle or path of travel.
37. Prior to issuance of any building permits, the developer shall pay all water and sewer fees, including but not limited to connection fees, wastewater treatment fees, sewer capacity fees and all other appropriate water and sewer fees.
38. Prior to building permit issuance, the applicant shall construct or guarantee the construction of all required public improvements including but not limited to, the potable water line, sewer line, reclaimed water line, potable water services, sewer laterals, reclaimed water services, electrical services, double detector check assemblies and reduced pressure principle assemblies within the public right of way and-or easements.
39. Prior to approval of the public improvement plans, the engineer shall provide the design to relocate the reclaimed lines that conflict with City Engineering Standards and Design Policy. All private utilities shall be located outside of the public street rightof-way unless otherwise approved by the Planning and Development Director and City Attorney.
40. The applicant shall dedicate easements for all public water, reclaimed water, sewer and electric facilities needed to serve the project in accordance the Department of Water and Power standards. The minimum easement width shall be 20 feet for one utility and 30 feet for more than one public utility facility unless otherwise approved by the Utilities Department. All public water and sewer facilities shall be provided a minimum 20 foot wide paved access road unless otherwise approved by the Utilities Department Director. Structures and trees shall not be constructed or installed within a public utility easement. The applicant shall dedicate an easement for the existing reclaimed water hydrant and meters located west of Temescal Canyon Road and north of Fashion Drive.
41. Prior to building permit issuance, the applicant shall construct or guarantee the construction of a private fire system with double detector check assemblies at all public fire services to the satisfaction of the Utilities Department and Fire Chief.
42. Fire Hydrants shall be a maximum 250-300 feet apart or as directed by the Fire Department.
43. Manhole rim elevations shall be lower than all pad elevations immediately downstream. Otherwise a back flow prevention valve will be required.
44. Static pressures exceeding 80 psi require an individual pressure regulator.
45. Reclaimed water shall be used for any construction activity, unless otherwise approved by the Utilities Director or their designee. Prior to obtaining a reclaimed construction meter from the City, a Reclaimed Water Application shall be submitted for the contractor to receive certification to handle reclaimed water.
CUP2023-0002 5 of 6 (Continued on next page)
Project Conditions
City of Corona
PUBLIC WORKS Noe Herrera
46. The City of Corona Utilities Department shall provide electric service to the development, subject to availability as determined by the Utilities Department.
47. The electric distribution system shall be applicant designed, procured and installed in accordance with City of Corona Utilities Department Electric Distribution Standards and Service Requirements. The developer shall prepare and submit electrical improvement plans to the Development Services Division for review and approval.
48. The applicant shall provide a separate irrigation water service for all HOA landscaped lots or easements. 6 of 6
Project Conditions
City of Corona
Attn: Eva Choi
City of Corona
400 S. Vicientia Avenue
Corona, CA 92882
Terrano Plaza, LLC
2518 N. Santiago BLVD
Orange, CA 92867
951-898-1502
Re: CUP2023-0002 Applicant Letter to construct 50 apartment units May 11 2023
Terrano Plaza, LLC proposes a SO-unit addition to the existing Terrano Apartment project to be located on the North and South sides of Fashion Drive in the commercial designation of the Dos Lagos Specific plan. The Terrano phase 2 development would include (7) residential buildings with unit plans ranging from 600 SF to 1,265 SF. The proposed architectural and landscape design includes 2-story and 3-story buildings with color and design features similar to the first phase of the Terrano project. This project would include site amenities such as a new pickle-ball court and BBQ area. Residents of this phase will have equal access to the amenities at the completed Terrano phase 1 project. The location of Terrano Phase 2 puts it at the heart of the Dos Lagos residential and commercial community, providing its residents with additional amenities at the shops at Dos Lagos, including a gas station to the south, a hotel to the north, and a golf course to the east. This complex provides adequate site access and additional parking above the city's requirements, as well as perimeter fencing to give its residents a more private community experience with a complete range of public amenities nearby.
Patrick Tritz
Principal
CUP2023-0002
ADDENDUM TO THE INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
FOR A DEVELOPMENT PROJECT
ENTITLED UNDER PRECISE PLAN PP2018-0003
WITHIN PLANNING AREA 1 OF THE DOS LAGOS SPECIFIC PLAN
CORONA, CALIFORNIA
Prepared by:
City of Corona
Planning and Development Services Department
400 S. Vicentia Avenue
Corona, CA 92882
951-736-2437
Contact: Eva Choi, Associate Planner
July 10, 2023
PP2018-0003/CUP2023-0002
IS/MND Addendum July 10, 2023
CITY OF CORONA
ADDENDUM TO INITIAL STUDY/MITIGATED NEGATIVE DECLARATION FOR PRECISE PLAN PP2018-0003, A DEVELOPMENT WITHIN
PLANNING AREA 1 OF THE DOS LAGOS SPECIFIC PLAN
A. PROJECT INFORMATION
1. Project Title: Conditional Use Permit (CUP2023-0002) for the development of 50 multiple-family residential
units on 2.96 acres within Planning Area 1 of the
Dos Lagos Specific Plan
2. Lead Agency Name and Address: City of Corona,
400 S. Vicentia Avenue, Corona, CA 92882
3. Contact Persons(s) and Phone Eva Choi, Associate Planner Numbers: City of Corona Planning & Development
Department
Numbers: 951-736-2437
4. Project Location: The Project is located on the west side of Temescal Canyon Road and on the north and
south sides of Fashion Drive, in the City of
Corona.
BACKGROUND & PROJECT DESCRIPTION:
The proposed 50-unit Multiple-Family project, known as Terrano II, is located on the west of Temescal Canyon Road and north of Dos Lagos Drive within Planning Area 1 of the Dos Lagos Specific Plan, in the City of Corona.
Within the Dos Lagos Specific Plan, Planning Area 1 allows a mix of land uses that include commercial, entertainment, office and residential with internal pedestrian connectivity. In June 2016, a 276-unit multiple-family project in 38 apartment buildings, Terrano I, was approved through a Conditional Use Permit review (CUP16-002) and an Initial Study/Mitigated Negative Declaration (IS/MND) was adopted for the project. Terrano I is located along the western edge of Planning Area 1, adjacent to Interstate-15. The eastern edge of the Planning Area 1 fronting Temescal Canyon Road was identified for commercial development. At a public hearing held on August 20, 2018, the commercial component envisioned for the remainder of Planning Area 1 was approved through Precise Plan review (PP2018-0003) and a separate IS/MND was adopted for the commercial project. The entitled commercial development included a 101-room, 4-story hotel; 11,000 square feet of restaurant space including a drive-through; 15,800 square feet of retail floor area including a convenience store with a 10-pump service station and a 2,000-square-foot ancillary drive-through carwash. The Terrano I apartment complex, hotel, and gas station with convenience store and car wash are completed and in operation.
PP2018-0003/CUP2023-0002
IS/MND Addendum July 10, 2023
The proposed Terrano II Multiple Family project consists of replacing the entitled 2,500-square foot drive-through restaurant and 15,100 square feet of restaurant and retail space with 50 multifamily apartment dwelling units in Planning Area 1, located specifically to the north and south sides of Fashion Drive. Figure 1 shows the proposed Terrano II Multiple-Family project location. It is the last development piece to Planning Area 1 of the Dos Lagos Specific Plan, therefore, access for the proposed apartments will be provided via the existing internal circulation system and no new public access driveway are proposed. For the purposes of this Addendum document, the Terrano II Multiple Family project (CUP2023-0002) is the “Modified Project”.
Figure 1:
The purpose of the Addendum is to evaluate the changes that are proposed to the original commercial development entitled under PP2018-0003. In connection with the Addendum, many of the previously approved technical studies have been updated to ensure the Addendum will not result in any environmental impacts not already analyzed in the MND that was previously adopted PP2018-0003/CUP2023-0002
IS/MND Addendum July 10, 2023
for PP2018-0003 or that was not known or could have been known in 2018. These updated studies include a noise assessment, a greenhouse gas assessment, an air quality report, a health risk assessment, and a traffic circulation update. The Addendum results in no additional or increased significant environmental impacts than those discussed in the 2018 MND or could have been discussed in 2018. However, the Addendum will reduce all of the impacts identified in the MND.
Thus, the Addendum is addressed in the Mitigated Negative Declaration, as all impacts of the Addendum are less than those analyzed in the adopted Mitigated Negative Declaration. The proposed modified Project does not result in new or increased significant impacts.
CEQA REQUIREMENTS FOR AN ADDENDUM: (CEQA Guidelines, § 15164(a).) (CEQA Guidelines, § 15162(a).)
As discussed above, the applicant has proposed to develop a 50-unit multi-family residential project to replace the previously entitled retail and restaurant uses within Planning Area 1 of the Dos Lagos Specific Plan. As the proposed residential project (Terrano II) modifies the previously adopted IS/MND, an addendum to the IS/MND is necessary to meet the requirements of the California Environmental Quality Act (CEQA).
The CEQA Guidelines (Sections 15162 and 15164) allow a lead agency t o prepare an addendum to a previously adopted IS/MND if minor technical changes or additions to the environmental evaluation are necessary, but none of the following occurs:
Substantial changes are proposed in the project which will require major revisions to the Environmental Impact Report or negative declaration due to the involvement of new significant effects;
1. Substantial changes occur with respect to the circumstances under which the project is undertaken which will require major revisions of the previous Environmental Impact Report or negative declaration due to involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects; or
2. New information of substantial importance, which was not known and could not have been known with the exercise of reasonable diligence at the time the previous Environmental Impact Report or negative declaration was adopted, shows any of the following:
a. The project will have one or more significant effect not discussed in the Environmental Impact Report;
b. Significant effects previously examined will be substantially more severe than shown;
c. Mitigation measures or alternatives previously found not to be feasible would in fact be feasible, and would substantially reduce one or more significant effects of the project, but the project proponents decline to adopt the mitigation measure or alternative; or
PP2018-0003/CUP2023-0002
IS/MND Addendum July 10, 2023
d. Mitigation measures or alternatives which are considerably different from those analyzed in the previous Environmental Impact Report or negative declaration would substantially reduce one or more significant effects on the environments, but the project proponents decline to adopt the mitigation measure or alternative.
This Addendum documents that included modifications to the approved Project do not trigger any of the conditions described above. Specifically, given the Project description and knowledge of s u p p l e m e n t a l a n a l y s e s c o m p a r i n g t h e proposed project with the previously entitled commercial component of Planning Area 1 that the proposed project intends to replace, the city has concluded that the Modified Project would not result in any new significant impacts not previously disclosed in the circulated IS/MND, nor would it result in a substantial increase in the magnitude of any significant environmental impact previously identified. For these reasons, an addendum to the adopted IS/MND is sufficient to meet the requirements of CEQA.
The Addendum need not be circulated for public review (CEQA Guidelines Section 15164[c]); however, an Addendum must be considered by the decision-making body prior to a decision on the project (CEQA Guidelines Section 15164[d]). This Addendum to the previously adopted IS/MND demonstrates that the environmental analysis, impacts, and mitigation requirements identified in the previously approved Final IS/MND remains substantively unchanged despite minor project refinements described herein and supports the finding that the proposed project does not raise any new issues and does not exceed the level of impacts identified and analyzed in the previously approved Final IS/MND.
The approved mitigation measures provided in the adopted IS/MND Mitigation Monitoring and Reporting Program (MMRP) have been incorporated by reference, with modifications (additions, deletions, renumbering/renaming, or other minor revisions) made as necessary to apply to the modified Project as shown in Appendix A. The adjusted mitigation measures do not change the original impact conclusions from the IS/MND, nor are they considerably different from that analyzed in the IS/MND.
ENVIRONMENTAL CHECKLIST:
CEQA Guidelines 15168(c)(4) recommends using a written checklist or similar device to confirm whether the environmental effects of a subsequent activity were adequately covered in an original project’s IS/MND. The focus of this analysis is on the identified changes associated with the proposed Modified Project (CUP2023-0002) and whether there would be any difference in identified impacts or required mitigation measures from those identified in the previously approved IS/MND.
The following analysis is used to: (1) compare the environmental impacts of the proposed Modified Project with impacts evaluated in the previously adopted IS/MND; (2) to identify whether the proposed Modified Project would result in new or more severe significant environmental impacts; and (3) to identify if there have been substantial changes with respect to the circumstances under which the Modified Project would be undertaken since adoption of the previously approved IS/MND that would result in new or more severe significant environmental effects.
PP2018-0003/CUP2023-0002
IS/MND Addendum July 10, 2023
This analysis confirms that the Modified Project is within the scope of the previously approved IS/MND, and the Modified Project would cause no new or more severe significant effects and no new mitigation measures are required.
The following discussion has been undertaken pursuant to the provisions of CEQA Guidelines Sections 15162 and 15164 to provide the factual basis for determining whether any changes associated with the Proposed Project Modifications, any changes in circumstance, or any new information since adoption of the previously approved IS/MND requires additional environmental review.
1 fjhh
Environmental: CUP 2023-0002 Addendum to IS/MND for PP2018-0003 July 10, 2023 Note: This form represents an abbreviation of the complete Environmental Checklist found in the City of Corona CEQA Guidelines. Sources of reference information used to produce this checklist may be found in the City of Corona Community Development Department, 400 S.
Vicentia Avenue, Corona, CA.
1. LAND USE AND PLANNING: Potentially
Significant
Impact
Potentially
Significant
Unless
Mitigation
Incorporated
Less than
Significant
Impact No Impact
a. Conflict with any land use plan/policy or agency regulation (general plan, specific plan, zoning)
b. Conflict with surrounding land uses
c. Physically divide established community
Discussion:
The previously adopted IS/MND concluded that the mixed-use commercial project will have no impact related to land use and planning and no mitigation is warranted for this topic.
Proposed Modified Project:
The modified Project will be constructed within Planning Area 1 of the Dos Lagos Specific Plan, which is intended to provide flexibility to market driven development that fosters opportunities for people to live in the same area where neighborhood supportive commercial, entertainment, shopping, and potentially employment are within walking distance reducing the need for vehicle trips. The residential project does not create land use incompatibility as it is consistent with the C (Commercial) zoning and Mixed-Use I General Plan designations. The residential project site is an infill location. It will not divide an established community and is consistent with local land use plans and development standards prescribed in the Dos Lagos Specific Plan. The modified Project will have no impact to land use and planning within Planning Area 1.
2. POPULATION AND HOUSING: Potentially
Significant
Impact
Potentially
Significant
Unless
Mitigation
Incorporated
Less than
Significant
Impact No Impact
a.
b.
Induce substantial growth
Displace substantial numbers of existing housing or people Discussion:
The modified Project will not induce substantial population growth or displace housing or people. The proposed 50 dwelling units will provide rental housing opportunities in addition to the existing Terrano I project which included 276 rental units built in 2017. Overall, at completion of the proposed modified Project, there will be a total of 326 residential rental units available within Planning Area 1 which is below the maximum of 450 units previously evaluated with the master planning of the Dos Lagos area.Therefore, the modified Project will not induce substantial growth.
The modified Project provides additional residential rental units that do not exist presently; therefore,the project will not displace existing residents or remove existing housing units from the market. Therefore, no mitigation is warranted.
3. GEOLOGIC PROBLEMS: Potentially
Significant
Impact
Potentially
Significant
Unless
Mitigation
Incorporated
Less than
Significant
Impact No Impact
a.
b.
c.
d.
e.
f.
Fault /seismic failures (Alquist-Priolo zone) /Landslide/Liquefaction Grading of more than 100 cubic yards
Grading in areas over 10% slope
Substantial erosion or loss of topsoil
Unstable soil conditions from grading
Expansive soils
Discussion:
The previous IS/MND disclosed that the project site is not located within an Alquist-Priolo Seismic Special Study Zone, and no known active or potentially active fault crosses the project site. It was also found that the site is not subject to liquefaction because of the soil conditions and combined with the relatively dense nature of the soils. Furthermore, the project site was previously rough graded for commercial development associated with the original project (PP2018-0003). The previous evaluation for the commercial project recognizes the site will need to be further graded in accordance with city’s grading regulation and finished in a manner that achieve positive drainage. Any potential impacts are mitigated by compliance with city’s grading ordinance through the grading permit and inspection process. The proposed modified Project is subject to implementation of an erosion control plan, grading permit 2 Environmental: CUP 2023-0002 Addendum to IS/MND for PP2018-0003 July 10, 2023 requirements and inspection; therefore, it does not cause new or increased significant impacts on geology and soils and no further mitigation is warranted with respect to geologic problems.
4. HYDROLOGY AND WATER QUALITY: Potentially
Significant
Impact
Potentially
Significant
Unless
Mitigation
Incorporated
Less than
significant
Impact No Impact
a.
b.
c.
d.
e.
f.
g.
h.
Violate water quality standards/waste discharge requirements Deplete groundwater supplies
Alter existing drainage pattern
Increase flooding hazard
Degrade surface or ground water quality
Within 100-year flood hazard area
Increase exposure to flooding
Exceed capacity of storm water drainage system
Discussion:
The previous IS/MND identified less than significant impact to the water quality standards and waste discharge requirements because the applicant is required to submit a final Water Quality Management Plan (WQMP) for review and approval by the Development Service Division. Additionally, the commercial project was required to implement on-site Best Management Practices (BMPs) identified in the WQMP, install underground stormwater detention and infiltration systems in order to minimize pollutant run-off into the city’s storm water drainage system. The full development entitled for Planning Area 1, both the residential units (Terrano I) and the commercial development were evaluated in a hydrology study and found that the project design at that time would result in less than significant impact provided that the storm water collection and conveyance systems identified in the hydrology study are implemented.
The proposed modified Project is subject to provision of an updated WQMP and hydrology study for review and approval by the Development Service Division. The previously evaluated WQMP accounted for the entirety of construction within Planning Area 1 and was found to be adequate in reducing water quality impacts to less than significant. The proposed modified Project is subject to on-site Best Management Practices and WQMP requirements based on the previous IS/MND which is has a similar or negligible increase of water flow, therefore with the implementation of previously required BMPs, stormwater collection and conveyance systems, the proposed modified Project does not cause new or increased significant impacts on water quality and drainage pattern, and no further mitigation is warranted.
5. AIR QUALITY: Potentially
Significant
Impact
Potentially
Significant
Unless
Mitigation
Incorporated
Less than
Significant
Impact No Impact
a.
b.
c.
d.
e.
Conflict with air quality plan
Violate air quality standard
Net increase of any criteria pollutant
Expose sensitive receptors to pollutants
Create objectionable odors
Discussion:
The previous IS/MND provided evaluations of air quality based on based on the worst-case scenario related to trip generation of the mixed-use commercial project. As the proposed modified Project reduces daily trip generation by approximately 50%, as stated in the updated traffic circulation assessment (Linscott, Law & Greenspan, May 10, 2023), the project, at completion would generate far less operational air quality emissions. Measured in pounds per day, the criteria pollutants that are analyzed for operations of the Project include Respirable Particulate Matter (PM10/PM2s), Nitrogen Oxide (NOx), Sulfur Oxide (SOx), Carbon Monoxide (CO), and Reactive Organic Gases (ROG) When compared to the significance thresholds established by the SCAQMO, no pollutant was identified as expected to exceed such thresholds for the daily operational emissions (LDN Consulting, Inc., January 31, 2023, Table 5, Page 6). Likewise, when compared to the significance thresholds established for daily construction air quality emissions, no pollutant will exceed such thresholds (Ibid. Table 4, Page 5). Therefore, no impacts related to air quality emission are anticipated from the proposed modified Project.
Environmental: CUP 2023-0002 Addendum to IS/MND for PP2018-0003 July 10, 2023 3 (1)
(2)
Each unit shall be installed with mechanical air quality filtration system with fresh air intake having a minimum efficiency reporting value (MERV) of 13. Such system must be clearly displayed on all plans for plan check and construction.
The developer shall provide written disclosure in the leasing documents for each unit that is located within 300 feet of the existing gasoline station located to the south of the project site regarding the potential health risks to the residents associated with potential exposure to benzene that may be emitted from gasoline refueling operations.
An updated air quality health risk screening letter (LDN Consulting, Inc., January 31, 2023) identify the proposed modified Project’s health risk impacts resulting from exposure to toxic air contaminants (TACs). The project site is located north of Dos Lagos Drive and south of Cabot Drive with the I-15 Freeway located to the west, which is consider a source of pollutant. Generally, risks are stated to be greater for sensitive receptors within 500 feet of a freeway or busy traffic corridor calculated based on a 70-year lifetime exposure and meteorological data. The north portion of the project site is 700 feet from the eastern edge of the I-15 and the south portion is 600 feet from the eastern edge of the I-15. Given the close proximately to the I-15, the applicant stated that all residential units will have mechanical ventilation filtration systems as required by the latest building codes such as California’s Title 24 which required a Minimum Efficiency Reporting Value (MERV) rating of 13. The MERV 13 filtration systems was a mitigation measure for the existing residential component (Terrano I) within Planning Area I, entitled under CUP16-002. Along with written disclosure in the leasing agreement to inform residential of its close proximity to a gasoline station. Given the residential nature of the proposed modified Project and its location within Planning Area 1, the same mitigation measures remain applicable in order to reduce air quality impacts.
Mitigation Measures -
6. TRANSPORTATION/TRAFFIC: Potentially
Significant
Impact
Potentially
Significant
Unless
Mitigation
Incorporated
Less than
Significant
Impact No Impact
a.
b.
c.
d.
e.
f.
Conflict with an applicable plan, ordinance or policy establishing measures of effectiveness for the performance of the circulation system Conflict with an applicable congestion management program Change in air traffic patterns
Traffic hazards from design features
Emergency access
Conflict with alternative transportation policies (adopted policies, plans or programs for public transit, bicycle or pedestrian facilities) Discussion:
The previous IS/MND provided mitigation measures that remain applicable to the proposed modified Project as it pertains to the overall access of Planning Area 1. Additionally, updated traffic circulation assessment (Linscott, Law & Greenspan, May 10, 2023) provided a net trip generation comparison between the entitled, unbuilt commercial uses within Planning Area 1 and the proposed 50-unit residential use. The result is a reduction in 2-way daily net trip generation by 68% for the proposed modified Project. The proposed Project will utilize the existing internal circulation system and will not require new public access driveway. With implementation of the previously identified mitigation measures, the proposed modified Project will have no impacts to traffic, and circulation and no additional mitigation measures are warranted.
The table below compares the traffic generation rates and forecast between the proposed 50-unit residential project and the previously entitled commercial component that the proposed project intends to replace.
Environmental: CUP 2023-0002 Addendum to IS/MND for PP2018-0003 July 10, 2023 4 7. BIOLOGICAL RESOURCES: Potentially
Significant
Impact
Potentially
Significant
Unless
Mitigation
Incorporated
Less than
Significant
Impact No Impact
a.
b.
c.
d.
e.
f.
Endangered or threatened species/habitat
Riparian habitat or sensitive natural community
Adversely affects federally protected wetlands
Interferes with wildlife corridors or migratory species Conflicts with local biological resource policies or ordinances Conflicts with any habitat conservation plan
Discussion:
The previous IS/MND did not identify any biological impacts. The required development fees due to Riverside County's Multiple Species Habitat Conservation Plan remains applicable to the residential project. Given that there are no water courses or vegetation existing on the site, the proposed modified Project will have no impact on biological resources.
8. MINERAL RESOURCES: Potentially
Significant
Impact
Potentially
Significant
Unless
Mitigation
Incorporated
Less than
Significant
Impact No Impact
a. Loss of mineral resource or recovery site
Discussion:
As disclosed in the previous IS/MND, the project site does not contain mineral resources. Therefore, the project does not impact mineral resources, and no mitigation is warranted.
5 Environmental: CUP 2023-0002 Addendum to IS/MND for PP2018-0003 July 10, 2023
9. HAZARDS AND HAZARDOUS MATERIALS: Potentially
Significant
Impact
Potentially
Significant
Unless
Mitigation
Incorporated
Less than
Significant
Impact No Impact
a.
b.
c.
d.
e.
f.
g.
Transport, use or disposal of hazardous materials
Risk of accidental release of hazardous materials
Hazardous materials/emissions within ¼ mile of
existing or proposed school
Located on hazardous materials site
Conflict with Airport land use plan
Impair emergency response plans
Increase risk of wildland fires
Discussion:
As discussed in the previous IS/MND, the project site was historically a silica mine from the 1980's to1990's and a Phase I Environmental Site Assessment (ESA) found no evidence of hazardous materials from the prior use at the site. Therefore, hazards or hazardous materials are not considered an impact with the proposed 50-unit residential project and no mitigation is warranted.
10. NOISE: Potentially
Significant
Impact
Potentially
Significant
Unless
Mitigation
Incorporated
Less than
Significant
Impact No Impact
a.
b.
c.
d.
e.
Exceed noise level standards
Exposure to excessive noise levels/vibrations
Permanent increase in ambient noise levels
Temporary increase in ambient noise levels
Conflict with Airport Land Use Plan noise contours
Discussion:
The previous IS/MND stated that temporary increase in ambient noise level is to be expected during the construction phase. This concern is addressed by strict adherence to city ordinance that regulate construction activities and noise. The prior analysis did not warrant special mitigation beyond city ordinance to prevent noise impacts.
A noise assessment for the proposed modified Project (LDN Consulting, Inc., January 31, 2023) found that city ordinance in regulating construction hours remain effective in preventing potential noise impact. The assessment also recommended that all equipment should be properly fitted with mufflers and all staging and maintenance should be conducted as far away from the existing residence as possible.
Construction vibrations impacting existing residential uses to the west (Terrano I) are found to be less than the Federal Transit Administration criteria for nuisance for nearby residential uses, therefore the assessment found the potential vibration impact o be less than significant. The assessment also recommended that the architectural plans to be designed to reduce interior noise to 45 dBA CNEL (Community Noise Exposure Level). These specific measures will be confirmed with the construction documents and during the plan check review process, prior to issuance of building permit. Therefore, the proposed modified Project will not result in any new or increased significant noise impacts.
11. PUBLIC SERVICES: Potentially
Significant
Impact
Potentially
Significant
Unless
Mitigation
Incorporated
Less than
Significant
Impact No Impact
a.
b.
c.
d.
e.
Fire protection
Police protection
Schools
Parks & recreation facilities
Other public facilities or services
Discussion:
The previous IS/MND for the commercial development did not consider the additional student enrollment in the Corona Norco Unified School District. As such the proposed modified Project has the potential to increase school enrollment not previously evaluated. The added 6 Environmental: CUP 2023-0002 Addendum to IS/MND for PP2018-0003 July 10, 2023 residential units is subject to payment of statutory school fees at the time of building permit issuance.
As the proposed modified Project and the implemented Terrano I project yield a total of 326 dwelling units, Planning Area 1 remains below the 450 residential units ascribed in the Specific Plan. The addition of 50 dwelling units does not change the demand for services that warrant the construction of additional fire facilities, police facilities, schools, or other similar facilities. To offset the cost of public services, the developer is required to applicable development impact fees at the time of issuance of building permits for the project. Therefore, no further mitigation is warranted.
12. UTILITIES: Potentially
Significant
Impact
Potentially
Significant
Unless
Mitigation
Incorporated
Less than
Significant
Impact No Impact
a.
b.
c.
d.
e.
f.
g.
Exceed wastewater treatment requirements
Involve construction/expansion of water or wastewater
treatment facilities
Involve construction/expansion of storm drains
Sufficient water supplies/compliance with Urban Water
Management Plan.
Adequate wastewater treatment capacity
Adequate landfill capacity
Comply with solid waste regulations
Discussion:
The previous IS/MND discussion on utilities concluded that the commercial project would have no impact on utilities demands. The proposed modified Project increases the residential units within Planning Area 1 but Planning Area 1 will remain below the 450 units prescribed by the Specific Plan which is within the growth parameters of the city’s 2020-2024 General Plan. The developer is responsible for coordinating with utilities providers to provide service to the new residential units. Therefore, the proposed modified Project poses no new impact or increased impacts on public services or utilities and no mitigation measures are warranted. 13 AESTHETICS: Potentially
Significant
Impact
Potentially
Significant
Unless
Mitigation
Incorporated
Less than
Significant
Impact No Impact
a.
b.
c.
d.
Scenic vista or highway
Degrade visual character of site & surroundings
Light or glare
Scenic resources (forest land, historic buildings within state scenic highway
Discussion:
The project site is not considered a scenic vista per the City’s Environmental Resources Element of the General Plan, therefore development of the project site will not impact scenic vista.
The previous IS/MND evaluated a commercial design with retail and restaurant uses at the project site. The proposed modified Project is residential and adhere to design guidelines established for High Density Residential development, along with landscaping requirements for the site. The proposed site layout and exterior building design, including finishes treatments are similar to the existing residential project to the west (Terrano I) and the hotel to the immediate north. The proposed modified Project provides a sense of cohesiveness with existing development within Planning Area 1 and enhances the aesthetic along Temescal Canyon Road. The proposed modified Project will not result in impacts related to aesthetics and light pollution. Therefore, no mitigation is warranted. 7 Environmental: CUP 2023-0002 Addendum to IS/MND for PP2018-0003 July 10, 2023
14. CULTURAL RESOURCES: Potentially
Significant
Impact
Potentially
Significant
Unless
Mitigation
Incorporated
Less than
Significant
Impact No Impact
a. Historical resource
b. Archaeological resource
c. Paleontological resource or unique geologic feature
d. Disturb human remains
Discussion:
The previous IS/MND reference a prior study related to Cultural Resources for the entire Dos Lagos Specific Plan area and concluded that the subject site has low potential for prehistoric or historic archaeological resources. The site was historically excavated and filled up to 14 feet and re-compacted in anticipation of future development However, the study still prescribes that if unanticipated cultural materials are unearthed during construction, work should be halted in the area until a qualified archaeologist can assess the significance of the find.
In accordance with standard mitigation required for the protection of cultural resources and in keeping with applicable laws, if human remains are encountered, State Health and Safety Code Section 7050.5 states that no further disturbance shall occur until the County Coroner has made a determination of origin and disposition pursuant to PRC Section 5097.98. Therefore, to ensure the preservation of any potential cultural or Paleontological resources, mitigation is warranted to ensure the project will have a less than significant effect on the environment with respect to cultural resources. The existing mitigation measures in the previously adopted MND for the original project remain applicable to the proposed modified Project.
15. AGRICULTURE RESOURCES: Potentially
Significant
Impact
Potentially
Significant
Unless
Mitigation
Incorporated
Less than
Significant
Impact No Impact
a. Williamson Act contract
b. Conversion of farmland to nonagricultural use
Discussion:
The previous IS/MND disclosed that the project site was previously used for mining purposes, it is not under any agricultural preserve contract pursuant to the Williamson Act. Therefore, the proposed modified Project to construct residential uses in place of previously analyzed commercial use would not alter the conclusion that any development on the subject property would result in no impact to agricultural operations and no mitigation is warranted.
16. GREENHOUSE GAS: Potentially
Significant
Impact
Potentially
Significant
Unless
Mitigation
Incorporated
Less than
Significant
Impact No Impact
a. Generate greenhouse gases
b. Conflict with a plan, policy or regulation
Discussion:
An updated greenhouse gas (GHG) letter (LDN Consulting, Inc., January 31, 2023) compared the previously entitled retail and restaurant uses and the proposed 50-unit resident use found that the project yields a reduction in GHG by 53.7%. Greenhouse gas emission generated from the previous commercial land use and the proposed residential use are presented in Ibid. Tables 1 and 2, page 3. The updated letter further stated the proposed residential project would not be required to implement GHG design features beyond state and local requirements. Due to the reduction GHG emissions, the proposed project would have no impact.
17. TRIBAL CULTURAL RESOURCES: Potentially
Significant
Impact
Potentially
Significant
Unless
Mitigation
Incorporated
Less than
Significant
Impact No Impact
a. Cause a substantial adverse change in the significance of a tribal cultural resource as defined in Public Resources Code Section 21074 that is listed or eligible for listing in the California Register of Historical Resources, or in a local register of historical resources as defined in Public Resources Code Section 5020.1(k), or
b. A resource determined by the lead agency, in its discretion and supported by substantial evidence, to the significant pursuant to criteria set forth in subsection © of Public Resources Code Section 5024.1
8 Environmental: CUP 2023-0002 Addendum to IS/MND for PP2018-0003 July 10, 2023 Discussion:
Please see Item 14 above for discussions and mitigation measures related to preservation of tribal rescores.
18. MANDATORY FINDING OF SIGNIFICANCE: Potentially
Significant
Impact
Potentially
Significant
Unless
Mitigation
Incorporated
Less than
Significant
Impact No Impact
a. Fish/ wildlife population or habitat or important historical sites b. Cumulatively considerable impacts
c. Substantial adverse effects on humans
d. Short-term vs. long-term goals
Discussion:
The previous IS/MND did not identify negative impacts to fish or wildlife as the as the site contains no bodies of water or known wildlife habitat. The site is the remaining vacant areas (comprising of 2.96 acres) within Planning Area 1 and was previously rough graded with existing commercial development on the adjacent property to the north and major street frontage on three frontages including Interstate 15 along the west site boundary. There is no evidence before the city that the project will have an adverse effect on fish or wildlife resources or cumulatively considerable impacts.
The proposed modified Project will not cause any additional mandatory findings of significance. The significance conclusions under the proposed modified Project are the same as the previous IS/MND because the additional 50 dwelling units will not cause any new or increased significant impacts and in fact, will result in decreased impacts in many categories such as traffic, noise, and greenhouse gas emissions.
19. PREVIOUS ENVIRONMENTAL ANALYSIS:
Earlier analysis may be used when one or more of the environmental effects have been adequately analyzed in an earlier EIR or Negative Declaration (Section 15063).
One or more portions of this Initial Study may have relied upon previous analysis in the IS/MND prepared for PP2018-0003 and CUP2018-0007 adopted on August 20, 2018, containing pertinent evaluation related to the subject project site.
DOCUMENTS INCORPORATED BY REFERENCE:
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
City of Corona General Plan, March 17, 2004
Dos Lagos Specific Plan, June 21, 2000
IS/MND prepared for PP2018-0003 and CUP2018-0007, adopted on August 20, 2018 Traffic Impact Analysis, prepared by Linscott, Law & Greenspan, May 21, 2018, Revised May 10, 2023 Air Quality Screening Letter, prepared LDN Consulting, Inc., January 31, 2023 Green House Gas Screening Letter, prepared by LDN Consulting, Inc., January 31, 2023 Noise Assessment, prepared by LDN Consulting, Inc., January 31, 2023 Health Risk Letter, prepared by LDN Consulting, Inc., January 31, 2023 N:\4600\2234630 - Terrano II at Dos Lagos, Corona\Report\4630 - Terrano II Apartments at Dos Lagos Traffic Impact Assessment Letter Report - Corona, 01-17-23.docx January 17, 2023
Mr. Patrick Tritz
1285 Corona Pointe Court
Suite 102
Corona, CA. 92879
LLG Reference: 2.22.4630.1
Subject: Traffic Circulation Assessment for the Proposed Terrano II Apartments at Dos Lagos Project
Corona, California
Dear Mr. Tritz:
Linscott, Law & Greenspan, Engineers (LLG) is pleased to submit the following Traffic Impact Assessment for the proposed Terrano II Apartments at Dos Lagos Project to replace the current entitlement on this portion of Planning Area 1 of Dos Lagos in the City of Corona, California. This analysis evaluates the potential traffic circulation impacts associated with the proposed multifamily residential replacement Project consistent with City of Corona requirements based on the City of Corona Traffic Impact Study Guidelines, (June 2006). It should be noted that this trip generation comparison analysis is based on the approved Traffic Impact Analysis (TIA) report for Planning Area 1 Terrano at Dos Lagos, prepared by LLG (May 21, 2018) and attached for reference.
PROJECT LOCATION AND DESCRIPTION
Planning Area 1 of the Dos Lagos Specific Plan was entitled in 2018 and included a 276-unit apartment complex, a 107 room hotel, 6,100 square-feet (SF) of commercial uses, 10,300 SF of restaurant uses (4,000 SF quality restaurant use and 6,300 SF high-turnover sit-down restaurant use), and a 20-fueling position gas station with convenience store and car wash, of which the apartment complex, hotel, and gas station are completed and opened. Figure 1 presents the proposed site plan for the Project, prepared by Summa Architecture, which shows the proposed apartment development and existing Planning Area 1 development. As shown in Figure 1, the proposed Project consists of replacing the entitled retail and restaurant uses with 50 multifamily (low-rise) apartment dwelling units within eight (8) buildings. Access for the proposed apartments will be provided via the existing internal circulation system and no new public access driveway are proposed.
Mr. Patrick Tritz
January 17, 2023
N:\4600\2234630 - Terrano II at Dos Lagos, Corona\Report\4630 - Terrano II Apartments at Dos Lagos Traffic Impact Assessment Letter Report - Corona, 01-17-23.docx
PROJECT TRAFFIC CHARACTERISTICS
Trip Generation Forecast Comparison
Traffic generation is expressed in vehicle trip ends, defined as one-way vehicular movements, either entering or exiting the generating land use. Generation equations and/or rates used in the traffic forecasting procedure are found in the Eleventh Edition of Trip Generation, published by the Institute of Transportation Engineers (ITE) [Washington D.C., 2021].
Table 1, attached, summarizes the trip generation rates used in forecasting the vehicular trips generated for the proposed Project and entitled land use and also presents the proposed Project’s net forecast peak hour and daily traffic volumes. As shown in the upper portion of Table 1, the trip generation potential of the proposed Project was estimated using the using ITE Land Use 220: Multifamily Housing (LowRise) Not Close to Rail Transit trip rates whereas the entitled retail and restaurant uses trip generation is based on the trip generation forecast (Tables 5-1 and 5-2) contained in the approved LLG TIA (May 21, 2018) on Pages 13 and 14.. Review of the middle of Table 1 indicates that the proposed apartment Project is forecast to generate 337 daily trips, with 20 trips (5 inbound, 15 outbound) produced in the AM peak hour and 26 trips (16 inbound, 10 outbound) produced in the PM peak hour on a “typical” weekday.
Next, review of the following section of Table 1 indicates that the entitled 6,100 square-feet (SF) of commercial uses and 10,300 SF of restaurant uses (4,000 SF quality restaurant use and 6,300 SF high-turnover sit-down restaurant use) is forecast to generate 1,075 daily trips, with 63 trips 31 inbound, 32 outbound) produced in the AM peak hour and 63 trips (39 inbound, 24 outbound) produced in the PM peak hour on a “typical” weekday.
As shown on the last row of Table 1, the net trip generation potential of the proposed Project compared to the trip generation of the entitled retail and restaurant uses is 738 net fewer daily trips, with 43 net fewer trips (-26 inbound, -17 outbound) produced in the AM peak hour and 37 net fewer trips (-23 inbound, -14 outbound) produced in the PM peak hour on a “typical” weekday.
As a result, based on the negative net trip generation forecast for the proposed Project compared to the entitled uses for Planning Area 1 of the Dos Lagos development, the proposed Project will not significantly impact the surrounding transportation system and does not require the preparation of a traffic impact study including level of service.
Mr. Patrick Tritz
January 17, 2023
N:\4600\2234630 - Terrano II at Dos Lagos, Corona\Report\4630 - Terrano II Apartments at Dos Lagos Traffic Impact Assessment Letter Report - Corona, 01-17-23.docx
CONCLUSION
Based on the results of the aforementioned net project trip generation forecast for the proposed Terrano II Apartments at Dos Lagos Project, which is 738 net fewer daily trips, with 43 net fewer trips (-26 inbound, -17 outbound) produced in the AM peak hour and 37 net fewer trips (-23 inbound, -14 outbound) produced in the PM peak hour on a “typical” weekday, we conclude that the proposed Project’s traffic circulation impact is considered “insignificant” based on the City of Corona TIS Guidelines.
Therefore, the Project would not require any specific traffic analysis including level of service.
We appreciate the opportunity to provide this Traffic Impact Assessment. Should you need further assistance, or have any questions regarding this analysis, please call us at (949) 825-6175.
Very truly yours,
Linscott, Law & Greenspan, Engineers
Keil D. Maberry, P.E.
Principal
Attachments
TABLE 1
PROJECT TRAFFIC GENERATION RATES AND FORECAST1
TERRANO II APARTMENTS AT DOS LAGOS, CORONA
ITE Land Use Code /
Project Description
Daily
2-Way
AM Peak Hour PM Peak Hour
Enter Exit Total Enter Exit Total
Trip Generation Rates:
220: Multifamily Housing (Low-Rise) Not Close to Rail Transit (TE/DU) 6.74 24% 76% 0.40 63% 37% 0.51
Proposed Project Trip Generation Forecast:
Terrano II Apartments at Dos Lagos (50 DU) 337 5 15 20 16 10 26 Total Proposed Project Trip Generation 337 5 15 20 16 10 26 Entitled Trip Generation Forecast:
Terrano Retail & Restaurants (16,400 SF) 2 1,075 31 32 63 39 24 63 Total Entitled Trip Generation 1,075 31 32 63 39 24 63
Net Project Trip Generation Forecast
(Proposed Project vs. Entitled) (738) (26) (17) (43) (23) (14) (37) Notes:
TE/DU = trip end per dwelling unit
1 Source: Trip Generation, 11th Edition, Institute of Transportation Engineers (ITE), Washington, D.C. (2021). 2 Source: Table 5-2, Planning Area 1 - Terrano at Dos Lagos Traffic Impact Analysis (LLG) dated May 21, 2018, which consists of 6,100 SF retail, 4,000 SF quality restaurant, and 6,300 SF high-turnover restaurant uses. The residential, hotel and gas station are currently constructed.
LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2-12-3291-1 Planning Area 1 – Terrano at Dos Lagos, Corona
N:\3200\2123291 - Rexco Dos Lagos, Corona\Planning Area 1 - Terrano\Report\3291 - Planning Area 1 - Terrano at Dos Lagos, Corona TIA 05-21-18.doc i
TABLE OF CONTENTS
SECTION PAGE
Executive Summary ................................................................................................................................. vi
1.0 Introduction................................................................................................................................ 1
1.1 Study Area......................................................................................................................... 2
1.1.1 Intersections......................................................................................................... 2
1.2 Traffic Impact Analysis Components................................................................................ 2
1.3 Traffic Impact Analysis Scenarios .................................................................................... 3
2.0 Project Description and Location............................................................................................. 4
2.1 Site Access ........................................................................................................................ 4
3.0 Analysis Conditions and Methodology .................................................................................... 5
3.1 Existing Street Network .................................................................................................... 5
3.2 Existing Transit Services................................................................................................... 6
3.3 Existing Area Traffic Volumes ......................................................................................... 6
3.4 Level Of Service (LOS) Analysis Methodologies ............................................................ 6
3.4.1 Highway Capacity Manual (HCM) Method of Analysis (Signalized Intersections)........................................................................................................ 6
3.4.2 Highway Capacity Manual (HCM) Method of Analysis (Unsignalized Intersections)........................................................................................................ 7
3.5 Impact Criteria and Thresholds......................................................................................... 7
3.5.1 Intersections......................................................................................................... 7
4.0 Traffic Forecasting Methodology ........................................................................................... 10
5.0 Project Traffic Characteristics............................................................................................... 11
5.1 Project Trip Generation Forecast .................................................................................... 11
5.2 Project Trip Distribution and Assignment....................................................................... 11
6.0 Future Traffic Conditions....................................................................................................... 15
6.1 Existing With Project Traffic Volumes........................................................................... 15
6.2 Year 2020 Without Project Traffic Volumes .................................................................. 15
6.2.1 Ambient Growth Traffic .................................................................................... 15
6.2.2 Cumulative Projects Traffic............................................................................... 15
6.3 Year 2020 With Project Traffic Volumes ....................................................................... 16
7.0 Existing Conditions Traffic Impact Analysis........................................................................ 19
7.1 Existing Conditions Intersection Capacity Analysis....................................................... 19
7.1.1 Existing Traffic Conditions................................................................................ 19
7.1.2 Existing With Project Traffic Conditions.......................................................... 19 LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2-12-3291-1 Planning Area 1 – Terrano at Dos Lagos, Corona
N:\3200\2123291 - Rexco Dos Lagos, Corona\Planning Area 1 - Terrano\Report\3291 - Planning Area 1 - Terrano at Dos Lagos, Corona TIA 05-21-18.doc ii
TABLE OF CONTENTS
SECTION PAGE
8.0 Year 2020 Conditions Traffic Impact Analysis..................................................................... 22
8.1 Year 2020 Conditions Intersection Capacity Analysis.................................................... 22
8.1.1 Year 2020 Without Project Traffic Conditions.................................................. 22
8.1.2 Year 2020 With Project Traffic Conditions....................................................... 22
9.0 Recommended Improvements ................................................................................................ 26
9.1 Existing With Project Traffic Conditions........................................................................ 26
9.2 Year 2020 With Project Traffic Conditions.................................................................... 26
10.0 Project Fair Share Analysis .................................................................................................... 27
10.1 Existing With Project Traffic Conditions........................................................................ 27
10.2 Year 2020 With Project Traffic Conditions.................................................................... 27
11.0 Site Access and Internal Circulation Analysis ...................................................................... 29
11.1 Site Access ...................................................................................................................... 29
11.1.1 Year 2020 With Project Traffic Conditions....................................................... 29
11.2 Internal Circulation.......................................................................................................... 29
12.0 Intersection Queue Length Analysis...................................................................................... 31
12.1 Existing With Project Intersection Queuing Evaluation ................................................. 31
12.2 Year 2020 With Project Intersection Queuing Evaluation.............................................. 31 LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2-12-3291-1 Planning Area 1 – Terrano at Dos Lagos, Corona
N:\3200\2123291 - Rexco Dos Lagos, Corona\Planning Area 1 - Terrano\Report\3291 - Planning Area 1 - Terrano at Dos Lagos, Corona TIA 05-21-18.doc iii
APPENDICES
APPENDIX
A. Approved Traffic Impact Study Scope of Work
B. Existing Intersection Lane Geometrics and Controls
C. Existing Traffic Count Data
C-I Intersection Counts
D. Existing Traffic Conditions Intersection Level of Service Calculation Worksheets D-I Existing Traffic Conditions
D-II Existing With Project Traffic Conditions
D-III Existing With Project With Mitigation Traffic Conditions E. Year 2020 Traffic Conditions Intersection Level of Service Calculation Worksheets E-I Year 2020 Without Project Traffic Conditions
E-II Year 2020 With Project Traffic Conditions
E-III Year 2020 With Project With Mitigation Traffic Conditions F. Project Driveway Level of Service Calculation Worksheets F-I Year 2020 With Project Traffic Conditions
LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2-12-3291-1 Planning Area 1 – Terrano at Dos Lagos, Corona
N:\3200\2123291 - Rexco Dos Lagos, Corona\Planning Area 1 - Terrano\Report\3291 - Planning Area 1 - Terrano at Dos Lagos, Corona TIA 05-21-18.doc iv
LIST OF FIGURES
SECTION – FIGURE # FOLLOWING PAGE
1–1 Vicinity Map ............................................................................................................................... 3 2–1 Existing Site................................................................................................................................. 4 2–2 Proposed Site Plan....................................................................................................................... 4 3–1 Existing Roadway Conditions and Intersection Controls.......................................................7 3–2 City of Corona General Plan Circulation Element....................................................................7 3–3 Existing AM Peak Hour Traffic Volumes................................................................................. 7 3–4 Existing PM Peak Hour Traffic Volumes ................................................................................. 7 5–1 Project Trip Distribution Pattern (Residential Component) .................................................12 5–2 Project Trip Distribution Pattern (Commercial Component) ...............................................12 5–3 AM Peak Hour Project Traffic Volumes................................................................................. 12 5–4 PM Peak Hour Project Traffic Volumes ................................................................................. 12 6–1 Existing With Project AM Peak Hour Traffic Volumes......................................................... 16 6–2 Existing With Project PM Peak Hour Traffic Volumes.......................................................... 16 6–3 Location of Cumulative Projects.............................................................................................. 16 6–4 Cumulative Projects AM Peak Hour Traffic Volumes........................................................... 16 6–5 Cumulative Projects PM Peak Hour Traffic Volumes ........................................................... 16 6–6 Year 2020 Without Project AM Peak Hour Traffic Volumes................................................ 16 6–7 Year 2020 Without Project PM Peak Hour Traffic Volumes................................................ 16 6–8 Year 2020 With Project AM Peak Hour Traffic Volumes..................................................... 16 6–9 Year 2020 With Project PM Peak Hour Traffic Volumes...................................................... 16 9–1 Year 2020 With Project Recommended Improvements......................................................... 26 LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2-12-3291-1 Planning Area 1 – Terrano at Dos Lagos, Corona
N:\3200\2123291 - Rexco Dos Lagos, Corona\Planning Area 1 - Terrano\Report\3291 - Planning Area 1 - Terrano at Dos Lagos, Corona TIA 05-21-18.doc v
LIST OF TABLES
SECTION-TABLE# PAGE
3-1 Level of Service Criteria For Signalized Intersections (HCM Methodology)................. 8 3-2 Level of Service Criteria For Unsignalized Intersections (HCM Methodology) ............ 9 5-1 Project Traffic Generation Rates.......................................................................................... 13 5-2 Project Traffic Generation Forecast..................................................................................... 14 6-1 Description of Cumulative Projects..................................................................................... 17 6-2 Cumulative Projects Trip Generation Forecast ................................................................... 18 7-1 Existing Conditions Peak Hour Intersection Capacity Analysis Summary..........................20-21 8-1 Year 2020 Conditions Peak Hour Intersection Capacity Analysis Summary ......................24-25 10-1 Year 2020 Intersection Fair Share Contribution.................................................................... 28 11-1 Project Access Peak Hour Capacity Analysis Summary....................................................... 30 12-1 Project Driveway Queue Length Analysis ............................................................................ 32 LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2-12-3291-1 Planning Area 1 – Terrano at Dos Lagos, Corona
N:\3200\2123291 - Rexco Dos Lagos, Corona\Planning Area 1 - Terrano\Report\3291 - Planning Area 1 - Terrano at Dos Lagos, Corona TIA 05-21-18.doc vi
EXECUTIVE SUMMARY
The proposed Project consists of developing a 276-unit apartment complex, a 107 room hotel, 6,100 square-feet (SF) of commercial uses, 10,300 SF of restaurant uses, and a 20- fueling position gas station with convenience store and car wash. The Project site is located on the northwest quadrant of Temescal Canyon Road and Dos Lagos Drive, in the southeast area of the City of Corona, California. Project access will be provided via three (3) driveways along Temescal Canyon Road and one (1) driveway along Dos Lagos Drive. The Project is anticipated to be completed and fully occupied by Year 2020. The proposed Project is expected to generate 4,775 daily trips (one half arriving, one half departing), with 329 trips (134 inbound, 195 outbound) produced in the AM peak hour and 326 trips (192 inbound, 134 outbound) produced in the PM peak hour. Ten (10) existing key study intersections and four (4) proposed Project driveways were designated for evaluation based on City of Corona Traffic Impact Analysis (TIA) criteria and discussions with City staff. The key intersections selected for evaluation in this report provide access to the study area and are listed as follows:
1. Grand Oaks at Cajalco Road
2. Temescal Canyon Road at Cajalco Road
3. Temescal Canyon Road at Blue Springs Drive
4. Temescal Canyon Road at Pronio Circle
5. Temescal Canyon Road at Lakeshore Drive
6. Temescal Canyon Road at Cabot Drive
7. Temescal Canyon Road at Dos Lagos Drive
8. I-15 Northbound Ramps at Weirick Road/Dos Lagos Drive
9. I-15 Southbound Ramps at Weirick Road
10. Weirick Road/Retreat Parkway at Weirick Road/Knabe Road
11. Temescal Canyon Road at Project Driveway 1
12. Temescal Canyon Road at Project Driveway 2/Fashion Drive
13. Temescal Canyon Road at Project Driveway 3 (proposed)
14. Project Driveway 4 at Dos Lagos Drive (proposed)
Existing Traffic Conditions
For the Existing traffic conditions, all ten (10) existing key study intersections currently operate at acceptable levels of service (LOS D or better) during the AM and PM peak hours when compared to the LOS standards defined in this report.
LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2-12-3291-1 Planning Area 1 – Terrano at Dos Lagos, Corona
N:\3200\2123291 - Rexco Dos Lagos, Corona\Planning Area 1 - Terrano\Report\3291 - Planning Area 1 - Terrano at Dos Lagos, Corona TIA 05-21-18.doc vii
Existing With Project Traffic Conditions
For the Existing With Project traffic conditions, all ten (10) key study intersections are forecast to operate at acceptable levels of service (LOS D or better) during the AM and PM peak hours when compared to the LOS standards defined in this report.
Year 2020 With Project Traffic Conditions
For the Year 2020 With Project traffic conditions, one (1) of the ten key study intersections (Temescal Canyon Road at Cajalco Road) is forecast to operate at an unacceptable level of service during the PM peak hour when compared to the LOS standards defined in this report, and will be significantly impacted for the Year 2020 With Project traffic conditions.
However, the implementation of the recommended improvements will offset the Project impacts and return the operating condition of the intersection to an acceptable level of service. The remaining key study intersections are projected to operate at acceptable service. The following improvements listed below have been identified to mitigate the traffic impacts at the intersection impacted by Project traffic:
o Temescal Canyon Road at Cajalco Road: Restripe the northbound approach to provide a third exclusive northbound left-turn lane and restripe the shared northbound through/right-turn lane to an exclusive northbound right-turn lane. Install eastbound right-turn overlap traffic signal phasing that will yield to northbound U-turn movements.
The Project’s fair share responsibility toward the restriping the northbound approach and the installation of an eastbound right-turn overlap is 30.36%. As the total cost of the improvements is estimated to be $20,000, the Project’s fair share contribution is approximately $6,072.00.
The Project driveways are forecast to operate at acceptable levels of service during the AM and PM peak hours under the Year 2020 With Project traffic conditions. The on-site circulation was evaluated in terms of vehicle-pedestrian conflicts. Based on our review of the preliminary site plan, the overall layout does not create significant vehiclepedestrian conflict points such that access for the residential and commercial components are not impacted by internal vehicle queuing/stacking. Project traffic is not anticipated to cause significant internal queuing/ stacking at the Project driveway. The on-site circulation is acceptable based on our review of the proposed site plan. The alignment and spacing of the Project driveway is also deemed adequate. Turning movements into and out of the Project site at the Project driveway are anticipated to operate at an acceptable service levels. As such, motorists entering and exiting the Project site from this driveway will be able to do so comfortably, safely, and without undue congestion.
LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2-12-3291-1 Planning Area 1 – Terrano at Dos Lagos, Corona
N:\3200\2123291 - Rexco Dos Lagos, Corona\Planning Area 1 - Terrano\Report\3291 - Planning Area 1 - Terrano at Dos Lagos, Corona TIA 05-21-18.doc viii
All existing or proposed left-turn or right-turn storage is sufficient at the Project driveways along Temescal Canyon Road and Cajalco Road under Existing With Project and Year 2020 With Project traffic conditions.
LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2-12-3291-1 Planning Area 1 – Terrano at Dos Lagos, Corona
N:\3200\2123291 - Rexco Dos Lagos, Corona\Planning Area 1 - Terrano\Report\3291 - Planning Area 1 - Terrano at Dos Lagos, Corona TIA 05-21-18.doc 1 TRAFFIC IMPACT ANALYSIS REPORT
PLANNING AREA 1
TERRANO AT DOS LAGOS
Corona, California
May 21, 2018
(Update of Report dated December 29, 2017)
1.0 INTRODUCTION
This traffic impact analysis evaluates the potential traffic impacts of the proposed Planning Area 1 Terrano at Dos Lagos project (hereinafter referred to as Project), on the area traffic circulation. The proposed Project consists of developing a 276-unit apartment complex, a 107 room hotel, 6,100 square-feet (SF) of commercial uses, 10,300 SF of restaurant uses, and a 20-fueling position gas station with convenience store and car wash. The Project site is located on the northwest quadrant of Temescal Canyon Road and Dos Lagos Drive, in the southeast area of the City of Corona, California. Project access will be provided via three (3) driveways along Temescal Canyon Road and one (1) driveway along Dos Lagos Drive. The Project is anticipated to be completed and fully occupied by Year 2020.
This report documents the findings and recommendations of a traffic impact analysis conducted by Linscott, Law & Greenspan, Engineers (LLG) to determine the potential impacts the Project may have on the local network in the vicinity of the Project site. The traffic impact analysis evaluates the operating conditions at ten (10) existing key study intersections and four (4) proposed Project driveways within the Project vicinity, estimates the trip generation potential of the Project and forecasts future (near-term) operating conditions without and with the Project.
The Project site has been visited and an inventory of adjacent area roadways and intersections was performed. Existing (i.e. baseline) peak hour traffic information has been collected at the ten (10) key study intersections on a “typical” weekday for use in the preparation of intersection level of service calculations. This traffic report analyzes existing (i.e. baseline) and future (near-term) weekday AM and PM peak hour traffic conditions for Existing (i.e. baseline) and Year 2020 traffic conditions without and with the proposed Project. Peak hour traffic forecasts for the Year 2020 traffic conditions have been projected by increasing existing traffic volumes by an annual growth rate of two percent (2%) per year and adding the traffic from nine (9) cumulative projects.
The work program for this traffic study was developed in conjunction with the City of Corona Public Works Department staff. Appendix A contains a copy of the approved City of Corona Traffic Impact Study Scoping Agreement.
LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2-12-3291-1 Planning Area 1 – Terrano at Dos Lagos, Corona
N:\3200\2123291 - Rexco Dos Lagos, Corona\Planning Area 1 - Terrano\Report\3291 - Planning Area 1 - Terrano at Dos Lagos, Corona TIA 05-21-18.doc 2 1.1 Study Area
1.1.1 Intersections
The ten (10) existing key study intersections and four (4) proposed Project driveways were designated for evaluation based on City of Corona Traffic Impact Analysis (TIA) criteria and discussions with City staff. The key intersections selected for evaluation in this report provide access to the study area and are listed as follows:
1. Grand Oaks at Cajalco Road
2. Temescal Canyon Road at Cajalco Road
3. Temescal Canyon Road at Blue Springs Drive
4. Temescal Canyon Road at Pronio Circle
5. Temescal Canyon Road at Lakeshore Drive
6. Temescal Canyon Road at Cabot Drive
7. Temescal Canyon Road at Dos Lagos Drive
8. I-15 Northbound Ramps at Weirick Road/Dos Lagos Drive
9. I-15 Southbound Ramps at Weirick Road
10. Weirick Road/Retreat Parkway at Weirick Road/Knabe Road
11. Temescal Canyon Road at Project Driveway 1
12. Temescal Canyon Road at Project Driveway 2/Fashion Drive
13. Temescal Canyon Road at Project Driveway 3 (proposed)
14. Project Driveway 4 at Dos Lagos Drive (proposed)
1.2 Traffic Impact Analysis Components
The Highway Capacity Manual (HCM) and corresponding Level of Service (LOS) calculations at the key study locations were used to evaluate the potential traffic-related impacts associated with area growth, cumulative projects, and the Project. When necessary, this report recommends intersection improvements that may be required to accommodate future traffic volumes and restore/maintain an acceptable Level of Service and/or addresses the impact of the Project.
Included in this Traffic Impact Analysis are:
Existing Traffic Counts,
Estimated Project traffic generation/distribution/assignment, AM and PM peak hour LOS analyses for Existing (i.e. Baseline) Conditions, AM and PM peak hour LOS analyses for Existing (i.e. Baseline) Conditions with Project traffic,
AM and PM peak hour LOS analyses for Near-Term (Year 2020) Conditions without and with Project traffic,
LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2-12-3291-1 Planning Area 1 – Terrano at Dos Lagos, Corona
N:\3200\2123291 - Rexco Dos Lagos, Corona\Planning Area 1 - Terrano\Report\3291 - Planning Area 1 - Terrano at Dos Lagos, Corona TIA 05-21-18.doc 3 Project-Specific Traffic Improvements, if any,
Site Access and Internal Circulation Evaluation, and
Queuing Analysis.
Figure 1-1 presents a Vicinity Map, which illustrates the general location of the Project and depicts the study locations and surrounding street system.
1.3 Traffic Impact Analysis Scenarios
The following scenarios are those for which Delay and corresponding LOS calculations have been performed at the key intersections for existing and near-term (Year 2020) traffic conditions:
A. Existing (i.e. Baseline) Traffic Conditions,
B. Existing (i.e. Baseline) With Project Traffic Conditions, C. Scenario (B) with Recommended Improvements, if any,
D. Year 2020 Without Project Traffic Conditions,
E. Year 2020 With Project Traffic Conditions, and
F. Scenario (E) With Recommended Improvements, if any.
LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2-12-3291-1 Planning Area 1 – Terrano at Dos Lagos, Corona
N:\3200\2123291 - Rexco Dos Lagos, Corona\Planning Area 1 - Terrano\Report\3291 - Planning Area 1 - Terrano at Dos Lagos, Corona TIA 05-21-18.doc 4 2.0 PROJECT DESCRIPTION AND LOCATION
The Project is comprised of the development of a 276-unit apartment complex, a 107 room hotel, 6,100 SF of commercial uses, 10,300 SF of restaurant uses (4,000 SF of quality restaurant and 6,300 SF of high-turnover restaurant), and a 20-fueling position gas station with convenience store and car wash. The Project site is located on the northwest corner of Temescal Canyon Road and Dos Lagos Drive in the southeast area of the City of Corona, California. Project access will be provided via three (3) driveways along Temescal Canyon Road and one (1) driveway along Dos Lagos Drive. The Project is anticipated to be completed and fully occupied by Year 2020.
Figure 2-1 presents an aerial depiction of the existing site for the proposed Project. Figure 2-2 presents the proposed site plan, prepared by Summa Architecture.
2.1 Site Access
As shown in Figure 2-2, primary access to the Project site will be provided via four (4) driveways.
Driveways 1 and 3 (located along Temescal Canyon Road) and Driveway 4 (located along Dos Lagos Road) will be stop-controlled right-in/right-out only driveways. Driveway 2 (located along Temescal Canyon Road) will be a signalized (six-phase) full movement driveway aligned with the main access for the existing Encanto Apartment development on the east side of Temescal Canyon Road. It should be noted that this access is currently signalized and denoted as Fashion Drive.
LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2-12-3291-1 Planning Area 1 – Terrano at Dos Lagos, Corona
N:\3200\2123291 - Rexco Dos Lagos, Corona\Planning Area 1 - Terrano\Report\3291 - Planning Area 1 - Terrano at Dos Lagos, Corona TIA 05-21-18.doc 5 3.0 ANALYSIS CONDITIONS AND METHODOLOGY
The principal local network of streets serving the site consists of Temescal Canyon Road, Cajalco Road, Blue Springs Drive, Lakeshore Drive, Cabot Drive, and Dos Lagos Drive/Weirick Road. The following discussion provides a brief synopsis of the key area streets.
3.1 Existing Street Network
The Corona Freeway (I-15) provides regional access to the Project site. The I-15 Freeway is located in close proximity west of the Project site.
Temescal Canyon Road is a north-south, four-lane divided roadway located east of the Project site.
Parking is not permitted along Temescal Canyon Road within the vicinity of the Project. The posted speed limit on Temescal Canyon Road is 45 miles per hour (mph). The intersections of Temescal Canyon Road at Cajalco Road, Blue Springs Drive and Lakeshore Drive are controlled by 8-phase, 6-phase and 3-phase traffic signals, respectively.
Cajalco Road is generally an east-west, six-lane divided roadway located north of the Project site.
East of Temescal Canyon Road, Cajalco Road is a two-lane undivided roadway. Parking is not permitted along Cajalco Road within the vicinity of the Project. The posted speed limit on Cajalco Road is 45 mph.
Blue Springs Drive is an east-west, two-lane divided roadway that borders the Project site on the north and west. Parking is not permitted along Blue Springs Drive within the vicinity of the Project.
The posted speed limit on Blue Springs Drive is 15 mph. Project access will be located along Blue Springs Drive via a full-access, unsignalized driveway.
Lakeshore Drive is an east-west as well as a north-south, two-lane undivided roadway located south and west and south of the Project site. Parking is not permitted along Lakeshore Drive within the vicinity of the Project. The posted speed limit on Lakeshore Drive is 15 mph.
Dos Lagos Drive is an east-west, two-lane divided Secondary classification roadway that borders the Project site on the south. Parking is not permitted along Dos Lagos Drive within the vicinity of the Project. The posted speed limit on Dos Lagos Drive is 35 mph.
Cabot Road is an east-west, two-lane undivided roadway that borders the Project site on the north.
Parking is permitted along Cabot Road within the vicinity of the Project. The posted speed limit on Cabot Road is 25 mph.
Figure 3-1 presents an inventory of the existing roadway conditions within the study area evaluated in this report. The number of travel lanes and intersection controls for the key area study intersections are identified.
Appendix B contains the most current aerials available online for all the key study intersections.
Figure 3-2 shows the current City of Corona General Plan Circulation Element.
LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2-12-3291-1 Planning Area 1 – Terrano at Dos Lagos, Corona
N:\3200\2123291 - Rexco Dos Lagos, Corona\Planning Area 1 - Terrano\Report\3291 - Planning Area 1 - Terrano at Dos Lagos, Corona TIA 05-21-18.doc 6 3.2 Existing Transit Services
The study area is served by the Riverside Transit Agency (RTA) and "Corona Cruiser," a Fixed Route Service by the City of Corona. Corona Cruiser runs along pre-designated Blue Line and Red Line fixed routes. A description of the transit services is as follows:
Riverside Transit Agency (RTA)
Route 206 runs from Corona Transit Center to Promenade Mall, and traverses the Project area along Temescal Canyon Road, Cajalco Road, and Dos Lagos Drive. During the AM peak hour, there is one (1) southbound bus. During the PM peak hour, there are two (2) northbound buses and one (1) southbound bus.
Corona Cruiser
This route does not traverse any of study intersections analyzed in this report during weekdays, but the Red Line provides service to The Promenade Shops at Dos Lagos on Saturdays via Temescal Canyon Road from the north.
3.3 Existing Area Traffic Volumes
Existing AM and PM peak hour traffic volumes for the ten (10) key study intersections evaluated in this report, were collected by Counts Unlimited, Inc. in October 2017. Appendix C contains the existing intersection turning movement traffic count data.
Figures 3-3 and 3-4 present the existing AM and PM peak hour traffic volumes, respectively, for the ten (10) existing key study intersections.
3.4 Level Of Service (LOS) Analysis Methodologies
AM and PM peak hour operating conditions for the key study intersections were evaluated using the methodology outlined in Chapter 19 of the Highway Capacity Manual 6 (HCM 6) for signalized intersections and the methodology outlined in Chapter 20 of the HCM 6 for two-way stop-controlled intersections.
3.4.1 Highway Capacity Manual (HCM) Method of Analysis (Signalized Intersections) In conformance with City of Corona requirements, AM and PM peak hour operating conditions for the key study intersections were evaluated using the HCM operations method of analysis. Based on the HCM operations method of analysis, level of service for signalized intersections and approaches is defined in terms of control delay, which is a measure of the increase in travel time due to traffic signal control, driver discomfort, and fuel consumption. Control delay includes the delay associated with vehicles slowing in advance of an intersection, the time spent stopped on an intersection approach, the time spent as vehicles move up in the queue, and the time needed for vehicles to accelerate to their desired speed. LOS criteria for traffic signals are stated in terms of the control delay in seconds per vehicle. The LOS thresholds established for the automobile mode at a signalized intersection are shown in Table 3-1.
LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2-12-3291-1 Planning Area 1 – Terrano at Dos Lagos, Corona
N:\3200\2123291 - Rexco Dos Lagos, Corona\Planning Area 1 - Terrano\Report\3291 - Planning Area 1 - Terrano at Dos Lagos, Corona TIA 05-21-18.doc 7 3.4.2 Highway Capacity Manual (HCM) Method of Analysis (Unsignalized Intersections) The HCM unsignalized methodology for stop-controlled intersections was utilized for the analysis of the unsignalized intersections. LOS criteria for unsignalized intersections differ from LOS criteria for signalized intersections as signalized intersections are designed for heavier traffic and therefore a greater delay. Unsignalized intersections are also associated with more uncertainty for users, as delays are less predictable, which can reduce users’ delay tolerance.
Two-way stop-controlled intersections are comprised of a major street, which is uncontrolled, and a minor street, which is controlled by stop signs. Level of service for a two-way stop-controlled intersection is determined by the computed or measured control delay. The control delay by movement, by approach, and for the intersection as a whole is estimated by the computed capacity for each movement. LOS is determined for each minor-street movement (or shared movement) as well as major-street left turns. The worst side street approach delay is reported. LOS is not defined for the intersection as a whole or for major-street approaches, as it is assumed that major-street through vehicles experience zero delay. The HCM control delay value range for two-way stopcontrolled intersections is shown in Table 3-2.
3.5 Impact Criteria and Thresholds
3.5.1 Intersections
The City of Corona considers LOS D to be the minimum acceptable LOS for all intersections that consist of collector and arterial roadways and LOS E for the Weirick Road at I-15 Ramp intersections based on the City of Corona General Plan Circulation Element Policy 6.1.6. In addition, the City of Corona considers LOS C to be the minimum acceptable LOS for local and collector streets in residential and industrial areas.
The City of Corona General Plan Circulation Element Policy 6.1.6 (adopted March 17, 2004) states:
Maintain Level of Service D or better on arterial streets wherever possible. At some key locations, such as at heavily traveled freeway interchanges, LOS E may be adopted as the acceptable standard, on a case-by-case basis. Locations that may warrant the LOS E standard include Lincoln Avenue at SR-91, Main Street at SR-91, McKinley Avenue at SR-91, Hidden Valley Parkway at I-15, Cajalco Road at I-15 and Weirick Road at I-15. A higher standard such as Level of Service C or better may be adopted for local and collector streets in residential areas.
LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2-12-3291-1 Planning Area 1 – Terrano at Dos Lagos, Corona
N:\3200\2123291 - Rexco Dos Lagos, Corona\Planning Area 1 - Terrano\Report\3291 - Planning Area 1 - Terrano at Dos Lagos, Corona TIA 05-21-18.doc 8 TABLE 3-1
LEVEL OF SERVICE CRITERIA FOR SIGNALIZED INTERSECTIONS (HCM METHODOLOGY) 1 Level of Service
(LOS)
Control Delay Per Vehicle
(seconds/vehicle) Level of Service Description
A < 10.0
This level of service occurs when progression is
extremely favorable and most vehicles arrive during the green phase. Most vehicles do not stop at all. Short cycle lengths may also contribute to low delay.
B > 10.0 and < 20.0
This level generally occurs with good progression, short cycle lengths, or both. More vehicles stop than with LOS A, causing higher levels of average delay.
C > 20.0 and < 35.0
Average traffic delays. These higher delays may result
from fair progression, longer cycle lengths, or both.
Individual cycle failures may begin to appear at this level.
The number of vehicles stopping is significant at this
level, though many still pass through the intersection
without stopping.
D > 35.0 and < 55.0
Long traffic delays At level D, the influence of
congestion becomes more noticeable. Longer delays may
result from some combination of unfavorable progression, long cycle lengths, or high v/c ratios. Many vehicles stop and the proportion of vehicles not stopping declines.
Individual cycle failures are noticeable.
E > 55.0 and < 80.0
Very long traffic delays This level is considered by many agencies to be the limit of acceptable delay. These high delay values generally indicate poor progression, long
cycle lengths and high v/c ratios. Individual cycle failures are frequent occurrences.
F 80.0
Severe congestion This level, considered to be
unacceptable to most drivers, often occurs with over
saturation, that is, when arrival flow rates exceed the capacity of the intersection. It may also occur at high v/c ratios below 1.0 with many individual cycle failures. Poor progression and long cycle lengths may also be major
contributing factors to such delay levels.
1 Source: Highway Capacity Manual 6, Chapter 19: Signalized Intersections.
LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2-12-3291-1 Planning Area 1 – Terrano at Dos Lagos, Corona
N:\3200\2123291 - Rexco Dos Lagos, Corona\Planning Area 1 - Terrano\Report\3291 - Planning Area 1 - Terrano at Dos Lagos, Corona TIA 05-21-18.doc 9 TABLE 3-2
LEVEL OF SERVICE CRITERIA FOR UNSIGNALIZED INTERSECTIONS (HCM METHODOLOGY) 2 Level of Service
(LOS)
Highway Capacity Manual (HCM)
Delay Per Vehicle (seconds/vehicle) Level of Service Description A 10.0 Little or no delay
B > 10.0 and 15.0 Short traffic delays
C > 15.0 and 25.0 Average traffic delays
D > 25.0 and 35.0 Long traffic delays
E > 35.0 and 50.0 Very long traffic delays
F > 50.0 Severe congestion
2 Source: Highway Capacity Manual 6, Chapter 20: Two-Way Stop-Controlled Intersections. The LOS criteria apply to each lane on a given approach and to each approach on the minor street. LOS is not calculated for major-street approaches or for the intersection as a whole.
LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2-12-3291-1 Planning Area 1 – Terrano at Dos Lagos, Corona
N:\3200\2123291 - Rexco Dos Lagos, Corona\Planning Area 1 - Terrano\Report\3291 - Planning Area 1 - Terrano at Dos Lagos, Corona TIA 05-21-18.doc 10 4.0 TRAFFIC FORECASTING METHODOLOGY
In order to estimate the traffic impact characteristics of the Project, a multi-step process has been utilized. The first step is traffic generation, which estimates the total arriving and departing traffic on a peak hour and daily basis. The traffic generation potential is forecast by applying the appropriate vehicle trip generation equations and/or rates to the Project development tabulation.
The second step of the forecasting process is traffic distribution, which identifies the origins and destinations of inbound and outbound Project traffic. These origins and destinations are typically based on demographics and existing/expected future travel patterns in the study area.
The third step is traffic assignment, which involves the allocation of Project traffic to study area streets and intersections. Traffic assignment is typically based on minimization of travel time, which may or may not involve the shortest route, depending on prevailing operating conditions and travel speeds.
Traffic distribution patterns are indicated by general percentage orientation, while traffic assignment allocates specific volume forecasts to individual roadway segments and intersection turning movements throughout the study area.
With the forecasting process complete and Project traffic assignments developed, the impact of the Project is isolated by comparing operational (LOS) conditions at selected key intersections using expected future traffic volumes with and without forecast Project traffic. If necessary, the need for site-specific and/or cumulative local area traffic improvements can then be evaluated.
LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2-12-3291-1 Planning Area 1 – Terrano at Dos Lagos, Corona
N:\3200\2123291 - Rexco Dos Lagos, Corona\Planning Area 1 - Terrano\Report\3291 - Planning Area 1 - Terrano at Dos Lagos, Corona TIA 05-21-18.doc 11 5.0 PROJECT TRAFFIC CHARACTERISTICS
5.1 Project Trip Generation Forecast
Traffic generation is expressed in vehicle trip ends, defined as one-way vehicular movements, either entering or exiting the generating land use. Generation equations and/or rates used in the traffic forecasting procedure are found in the Ninth Edition of Trip Generation, published by the Institute of Transportation Engineers (ITE) [Washington D.C., 2012].
Table 5-1 summarizes the trip generation rates used in forecasting the vehicular trips generated by the proposed Project. The trip generation potential for the proposed Project was forecast using the ITE Land Use rates shown in Table 5-1.
Table 5-2 presents the forecast daily and peak hour Project traffic volumes for a "typical" weekday.
Applicable pass-by reduction and internal capture factors were incorporated into the daily, AM peak hour and PM peak hour traffic forecasts. The factors used in this report, which are summarized in the footnotes of Table 5-2, are based on information published in the Trip Generation Handbook, published by ITE, August 2014.
Hence, the net traffic generation potential of the proposed project totals 4,775 daily trips (one half arriving, one half departing), with 329 trips (134 inbound, 195 outbound) produced in the AM peak hour and 326 trips (192 inbound, 134 outbound) produced in the PM peak hour. The potential traffic impacts of the aforementioned net project trips are evaluated in the traffic analysis section of this report. The trip generation methodology and forecasts were approved by the City of Corona staff prior to proceeding with further analysis.
5.2 Project Trip Distribution and Assignment
The directional trip distribution patterns for the Residential and Commercial components of the Project are presented in Figures 5-1 and 5-2. Project traffic volumes, both entering and exiting the site, have been distributed and assigned to the adjacent street system based on the following considerations:
the site's proximity to major traffic carriers (i.e. I-15 Freeway, Cajalco Road, etc…), expected localized traffic flow patterns based on adjacent street channelization and presence of traffic signals;
ingress/egress availability at the Project site; and
the traffic-carrying capacity and travel speed available on roadways serving the Project site.
The Project trip distribution pattern was submitted to the City staff for their review and approval prior to proceeding with further analyses.
The anticipated AM and PM peak hour Project traffic volumes at the ten (10) key study intersections and four (4) Project driveways are presented in Figures 5-3 and 5-4, respectively. The traffic volume LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2-12-3291-1 Planning Area 1 – Terrano at Dos Lagos, Corona
N:\3200\2123291 - Rexco Dos Lagos, Corona\Planning Area 1 - Terrano\Report\3291 - Planning Area 1 - Terrano at Dos Lagos, Corona TIA 05-21-18.doc 12 assignment presented in the above mentioned figures reflect the traffic distribution characteristics shown in Figure 5-1 and the traffic generation forecast presented in the lower portion of Table 5-2.
LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2-12-3291-1 Planning Area 1 – Terrano at Dos Lagos, Corona
N:\3200\2123291 - Rexco Dos Lagos, Corona\Planning Area 1 - Terrano\Report\3291 - Planning Area 1 - Terrano at Dos Lagos, Corona TIA 05-21-18.doc 13 TABLE 5-1
PROJECT TRAFFIC GENERATION RATES3
ITE Land Use Code /
Project Description
Daily
2-Way
AM Peak Hour PM Peak Hour
Enter Exit Total Enter Exit Total
Generation Factors:
220: Apartment (TE/DU) 6.65 20% 80% 0.51 65% 35% 0.62 310: Hotel (TE/Room) 8.17 59% 41% 0.53 51% 49% 0.60
820: Shopping Center (TE/1,000 SF)4 95.73 62% 38% 2.29 48% 52% 8.28 931: Quality Restaurant (TE/1,000 SF) 89.95 -- -- 0.81 67% 33% 7.49 932: High-Turnover (Sit-Down) Restaurant (TE/1,000 SF) 127.15 55% 45% 10.81 60% 40% 9.85 946: Gasoline/Service Station with Convenience Store with Car Wash (TE/Vehicle Fueling Positions) 152.84 51% 49% 11.84 51% 49% 13.86 Notes:
TE = Trip ends
DU = Dwelling unit
3 Source: Trip Generation, 9th Edition, Institute of Transportation Engineers (ITE), Washington, D.C. (2012). Average rates used. 4 Shopping Center rates based on equation for 6.200 TSF shopping center.
LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2-12-3291-1 Planning Area 1 – Terrano at Dos Lagos, Corona
N:\3200\2123291 - Rexco Dos Lagos, Corona\Planning Area 1 - Terrano\Report\3291 - Planning Area 1 - Terrano at Dos Lagos, Corona TIA 05-21-18.doc 14 TABLE 5-2
PROJECT TRAFFIC GENERATION FORECAST5
ITE Land Use Code /
Project Description
Daily
2-Way
AM Peak Hour PM Peak Hour
Enter Exit Total Enter Exit Total
Proposed Project Generation Forecast:
Apartments (276 DU) 1,835 28 113 141 111 60 171
Internal Capture6
-688 -2 -9 -11 -36 -22 -58
Subtotal - Apartments 1,147 26 104 130 75 38 113
Hotel (107 Rooms) 874 34 23 57 33 31 64
Internal Capture6-190 -1 -5 -6 -10 -5 -15
Subtotal – Hotel 684 33 18 51 23 26 49
Shopping Center (6,100 SF) 1,103 17 11 28 44 48 92
Internal Capture6
-407 -2 -2 -3 -11 -22 -32
Subtotal 696 15 9 25 33 26 60
Pass-by (Daily: 10%, AM: 10% PM: 34%) -70 -2 -1 -3 -11 -9 -20 Subtotal – Shopping Center 626 13 8 22 22 17 40
Quality Restaurant (4,000 SF) 360 2 1 3 20 10 30
Internal Capture6
-205 -1 0 -1 -10 -6 -16
Subtotal 155 1 1 2 10 4 14
Pass-by (Daily: 10%, AM: 0% PM: 44%) -16 0 0 0 -4 -2 -6 Subtotal – Quality Restaurant 139 1 1 2 6 2 8
High-Turnover Restaurant (6,300 SF) 801 37 31 68 37 25 62 Internal Capture6-457 -18 -6 -24 -18 -16 -34
Subtotal 344 19 25 44 19 9 28
Pass-by (Daily: 10%, AM: 0% PM: 43%) -34 -2 -2 -4 -8 -4 -12 Subtotal – High-Turnover Restaurant 310 17 23 40 11 5 16 Gas Station (20 fueling stations) 3,057 121 116 237 141 136 277 Internal Capture6-565 -6 -8 -15 -17 -31 -49
Subtotal 2,492 115 108 222 124 105 228
Pass-by (Daily: 25%, AM: 62% PM: 56%) -623 -71 -67 -138 -69 -59 -128 Subtotal – Gas Station 1,869 44 41 84 55 46 100
Total Traffic Generation Forecast 4,775 134 195 329 192 134 326
5 Source: Trip Generation, 9
th Edition, Institute of Transportation Engineers (ITE), Washington, D.C. (2012). Average rates used. 6 Internal capture trips were calculated using the Internal Capture spreadsheet tool developed by NCHRP.
LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2-12-3291-1 Planning Area 1 – Terrano at Dos Lagos, Corona
N:\3200\2123291 - Rexco Dos Lagos, Corona\Planning Area 1 - Terrano\Report\3291 - Planning Area 1 - Terrano at Dos Lagos, Corona TIA 05-21-18.doc 15 6.0 FUTURE TRAFFIC CONDITIONS
6.1 Existing With Project Traffic Volumes
The estimates of Project-generated traffic volumes were added to the Existing traffic conditions to develop traffic projections for the Existing With Project traffic conditions. Figures 6-1 and 6-2 present the anticipated AM and PM peak hour Existing With Project traffic volumes, respectively, at the ten (10) key study intersections and four (4) Project driveways.
6.2 Year 2020 Without Project Traffic Volumes
6.2.1 Ambient Growth Traffic
For future traffic conditions, background traffic growth estimates have been calculated using an ambient growth factor. The ambient growth factor is intended to include unknown and future cumulative projects in the study area, as well as account for regular growth in traffic volumes due to the development of projects outside the study area. The application of the two percent (2%) annual growth rate to baseline Year 2017 traffic volumes results in a six percent (6%) growth in existing baseline volumes at the ten (10) key study intersections to horizon Year 2020.
6.2.2 Cumulative Projects Traffic
The City of Corona and Riverside County have identified nine (9) cumulative projects within the Project study area. Cumulative projects, as defined by Section 15355 of the CEQA Guidelines, are “closely related past, present and reasonably foreseeable probable future projects.” The Traffic Impact Analysis assumes that these cumulative projects will be developed and operational when the proposed Project is operational, which is the most conservative approach, since the exact timing of each cumulative project is uncertain. In addition, impacts for these cumulative projects would likely be, or have been, subject to mitigation measures, which could reduce potential impacts. Under this analysis, however, those mitigation measures are not considered. The locations of these cumulative projects are presented in Figure 6-3.
Table 6-1 presents the location, description, and development totals of the cumulative projects.
Table 6-2 presents the resultant trip generation for cumulative projects. As shown in Table 6-2, the nine (9) cumulative projects are expected to generate 9,222 daily trips (one half arriving, one half departing) on a “typical” weekday, with 768 trips forecast during the AM peak hour and 913 trips forecast during the PM peak hour.
The anticipated AM and PM peak hour cumulative projects traffic volumes at the ten (10) key study intersections are presented in Figures 6-4 and 6-5, respectively. Figures 6-6 and 6-7 present Year 2020 Without Project AM and PM peak hour traffic volumes at the ten (10) key study intersections, respectively. It should be noted that Year 2020 Without Project traffic volumes include ambient traffic growth as well as the traffic from the nine (9) cumulative projects.
It should be emphasized that because this traffic impact analysis utilizes both an ambient growth factor along with a list of cumulative projects approach to analyze cumulative impacts, this traffic impact analysis is conservative and would tend to overstate cumulative traffic impacts.
LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2-12-3291-1 Planning Area 1 – Terrano at Dos Lagos, Corona
N:\3200\2123291 - Rexco Dos Lagos, Corona\Planning Area 1 - Terrano\Report\3291 - Planning Area 1 - Terrano at Dos Lagos, Corona TIA 05-21-18.doc 16 6.3 Year 2020 With Project Traffic Volumes
The estimates of Project-generated traffic volumes were added to the Year 2020 Without Project traffic conditions to develop traffic projections for the Year 2020 With Project traffic conditions.
Figures 6-8 and 6-9 present the anticipated AM and PM peak hour Year 2020 With Project traffic volumes, respectively, at the ten (10) key study intersections and four (4) Project driveways.
LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2-12-3291-1 Planning Area 1 – Terrano at Dos Lagos, Corona
N:\3200\2123291 - Rexco Dos Lagos, Corona\Planning Area 1 - Terrano\Report\3291 - Planning Area 1 - Terrano at Dos Lagos, Corona TIA 05-21-18.doc 17 TABLE 6-1
DESCRIPTION OF CUMULATIVE PROJECTS
No. Cumulative Project Location/Address Description
1. Live Work (Lot 8) Dos Lagos 75 DU Apartment
2. PA 3A: Dos Lagos Commercial7 South of Pronio Circle, West of Temescal Canyon Road
17,164 SF Office, 4,735 SF
Commercial
3. PA 6: Manufacturing at Dos Lagos8
East of Temescal Canyon Road,
Between Cajalco Road and
Breezy Meadow Lane
67,737 SF Manufacturing
4. Temescal Canyon Collision East of Temescal Canyon Road, South of Cajalco Road
25,038 SF High End Auto Collision
Repair Facility
5. CUP03739 Northeast corner of Temescal
Canyon Road at Cajalco Road
10 Fueling Positions Gas Station With
Convenience Market and Car Wash
6. PP24234 Northwest of Knabe Road at
Forest Boundary Road 77,231 SF Industrial
7. PP26080 Northwest corner of Knabe
Road at Bedford Motor Way 140,000 SF Industrial
8. PP26097 South corner of Retreat
Parkway at Knabe Road 94,000 SF Medical Outpatient Clinic
9. TR35249 22395 Forest Boundary Road 51 DU Single Family Detached Notes:
DU = Dwelling Units
SF = Square-Feet
7 Source: PA 3A Dos Lagos Commercial Office Focused Site Traffic Impact Analysis Report, prepared by LLG Engineers, dated September 16, 2014.
8 Source: PA6 – Manufacturing Focused Site Traffic Impact Analysis Report, prepared by LLG Engineers, dated June 13, 2016.
LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2-12-3291-1 Planning Area 1 – Terrano at Dos Lagos, Corona
N:\3200\2123291 - Rexco Dos Lagos, Corona\Planning Area 1 - Terrano\Report\3291 - Planning Area 1 - Terrano at Dos Lagos, Corona TIA 05-21-18.doc 18 TABLE 6-2
CUMULATIVE PROJECTS TRIP GENERATION FORECAST9
Cumulative Project Description
Daily
2-Way
AM Peak Hour PM Peak Hour
Enter Exit Total Enter Exit Total
1. Live Work (Lot 8) 499 8 30 38 31 16 47
2. PA 3A: Dos Lagos Commercial10 890 37 12 49 28 49 77
3. PA 6: Manufacturing at Dos Lagos11 283 40 16 56 20 32 52
4. Temescal Canyon Collision 779 37 19 56 37 41 78
5. CUP03739 1,375 54 52 106 31 30 61
6. PP24234 538 62 9 71 9 66 75
7. PP26080 976 114 15 129 16 120 136
8. PP26097 3,396 178 47 225 94 242 336
9. TR35249 486 10 28 38 32 19 51
Cumulative Projects
Total Trip Generation Potential
9,222 540 228 768 298 615 913
9 Source: Trip Generation, 9th Edition, Institute of Transportation Engineers, (ITE) [Washington, D.C. (2012)]. Average rates used. 10 Source: PA 3A Dos Lagos Commercial Office Focused Site Traffic Impact Analysis Report, prepared by LLG Engineers, dated September 16, 2014.
11 Source: PA6 – Manufacturing Focused Site Traffic Impact Analysis Report, prepared by LLG Engineers, dated June 13, 2016.
LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2-12-3291-1 Planning Area 1 – Terrano at Dos Lagos, Corona
N:\3200\2123291 - Rexco Dos Lagos, Corona\Planning Area 1 - Terrano\Report\3291 - Planning Area 1 - Terrano at Dos Lagos, Corona TIA 05-21-18.doc 19 7.0 EXISTING CONDITIONS TRAFFIC IMPACT ANALYSIS
The existing conditions analysis establishes the basis for the future forecasts for the Project. This analysis is based on existing intersection counts collected in October 2017. The existing conditions analysis reflects these counts as well as existing lane configurations for all analyzed intersections.
7.1 Existing Conditions Intersection Capacity Analysis
Table 7-1 summarizes the peak hour Level of Service results at the key study intersections for existing traffic conditions, with and without the Project. The first column (1) of Delay/LOS values in Table 7-1 presents a summary of Existing AM and PM peak hour traffic conditions. The second column (2) in Table 7-1 presents forecast Existing With Project traffic conditions. The third column (3) of Table 7-1 shows whether the traffic associated with the Project will have a significant impact based on the LOS standards and the significance impact criteria defined in this report. The fourth column (4) of Table 7-1 presents the Level of Service with the implementation of traffic mitigation improvements, if necessary.
7.1.1 Existing Traffic Conditions
Review of column (1) of Table 7-1 indicates that for the Existing traffic conditions, all ten (10) existing key study intersections currently operate at acceptable levels of service (LOS D or better) during the AM and PM peak hours when compared to the LOS standards defined in this report.
7.1.2 Existing With Project Traffic Conditions
Review of column (2) of Table 7-1 indicates that for the Existing With Project traffic conditions, all ten (10) key study intersections are forecast to operate at acceptable levels of service (LOS D or better) during the AM and PM peak hours when compared to the LOS standards defined in this report.
Review of column (3) of Table 7-1 indicates that none of the ten (10) key study intersections will be significantly impacted based on the LOS criteria defined in this report for the Existing With Project traffic conditions.
Appendix D contains the Delay/LOS calculation worksheets for the Existing Traffic Conditions.
LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2-12-3291-1 Planning Area 1 – Terrano at Dos Lagos, Corona
N:\3200\2123291 - Rexco Dos Lagos, Corona\Planning Area 1 - Terrano\Report\3291 - Planning Area 1 - Terrano at Dos Lagos, Corona TIA 05-21-18.doc 20 TABLE 7-1
EXISTING CONDITIONS PEAK HOUR INTERSECTION CAPACITY ANALYSIS SUMMARY12 Key Intersection
Control
Type
Minimum
Acceptable LOS
Time
Period
(1)
Existing
Traffic Conditions
(2)
Existing
With Project
Traffic Conditions
(3)
Significant
Impact
(4)
Existing
With Project
With Mitigation
Delay
(s/v) LOS
Delay
(s/v) LOS Yes/No
Delay
(s/v) LOS
1. Grand Oaks at 6 Traffic
D
AM 10.9 B 10.9 B No -- --
Cajalco Road Signal PM 28.1 C 28.0 C No -- --
2. Temescal Canyon Road at 8 Traffic
D
AM 43.7 D 45.6 D No -- --
Cajalco Road Signal PM 50.1 D 51.3 D No -- --
3. Temescal Canyon Road at 6 Traffic
D
AM 13.1 B 13.8 B No -- --
Blue Springs Drive Signal PM 12.4 B 12.5 B No -- --
4. Temescal Canyon Road at 5 Traffic
D
AM 7.3 A 7.6 A No -- --
Pronio Circle Signal PM 5.1 A 5.1 A No -- --
5. Temescal Canyon Road at 3 Traffic
D
AM 3.2 A 3.4 A No -- --
Lakeshore Drive Signal PM 7.7 A 7.7 A No -- --
6. Temescal Canyon Road at 6 Traffic
D
AM 12.7 B 13.1 B No -- --
Cabot Drive Signal PM 14.6 B 14.4 B No -- --
7. Temescal Canyon Road at 3 Traffic
D
AM 17.7 B 18.8 B No -- --
Dos Lagos Drive Signal PM 26.9 C 27.9 C No -- --
Notes:
s/v = seconds per vehicle (delay)
LOS = Level of Service, please refer to Tables 3-1 and 3-2 for the LOS definitions Bold Delay/LOS values indicate adverse service levels based on the LOS standards mentioned in this report
12 Appendix D contains the Delay/LOS calculation worksheets for all study intersections.
LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2-12-3291-1 Planning Area 1 – Terrano at Dos Lagos, Corona
N:\3200\2123291 - Rexco Dos Lagos, Corona\Planning Area 1 - Terrano\Report\3291 - Planning Area 1 - Terrano at Dos Lagos, Corona TIA 05-21-18.doc 21 TABLE 7-1 (CONTINUED)
EXISTING CONDITIONS PEAK HOUR INTERSECTION CAPACITY ANALYSIS SUMMARY13 Key Intersection
Control
Type
Minimum
Acceptable LOS
Time
Period
(1)
Existing
Traffic Conditions
(2)
Existing
With Project
Traffic Conditions
(3)
Significant
Impact
(4)
Existing
With Project
With Mitigation
Delay
(s/v) LOS
Delay
(s/v) LOS Yes/No
Delay
(s/v) LOS
8. I-15 Northbound Ramps at 3 Traffic
D
AM 19.6 B 19.2 B No -- --
Weirick Road/Dos Lagos Drive Signal PM 17.7 B 17.5 B No -- --
9. I-15 Southbound Ramps at 3 Traffic
D
AM 17.3 B 19.4 B No -- --
Weirick Road Signal PM 25.0 C 25.4 C No -- --
10. Weirick Road/Retreat Parkway at 8 Traffic
D
AM 33.4 C 34.7 C No -- --
Weirick Road/Knabe Road Signal PM 36.1 D 35.7 D No -- -- Notes:
s/v = seconds per vehicle (delay)
LOS = Level of Service, please refer to Tables 3-1 and 3-2 for the LOS definitions Bold Delay/LOS values indicate adverse service levels based on the LOS standards mentioned in this report
13 Appendix D contains the Delay/LOS calculation worksheets for all study intersections.
LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2-12-3291-1 Planning Area 1 – Terrano at Dos Lagos, Corona
N:\3200\2123291 - Rexco Dos Lagos, Corona\Planning Area 1 - Terrano\Report\3291 - Planning Area 1 - Terrano at Dos Lagos, Corona TIA 05-21-18.doc 22 8.0 YEAR 2020 CONDITIONS TRAFFIC IMPACT ANALYSIS
The relative impacts of the added Project traffic volumes generated by proposed Project during the AM and PM peak hour conditions was evaluated based on analysis of future Year 2020 operating conditions at the ten (10) key study intersections, with and without the proposed Project. The previously discussed capacity analysis procedures were utilized to investigate the future Delay and service level characteristics at each study intersection. The significance of the potential impacts of the Project at each key intersection was then evaluated using the traffic impact criteria mentioned in this report.
8.1 Year 2020 Conditions Intersection Capacity Analysis Table 8-1 summarizes the AM and PM peak hour Level of Service results at the key study intersections for the Year 2020 traffic conditions. The first column (1) of Delay/LOS values in Table 8-1 presents a summary of existing AM and PM peak hour traffic conditions (which were also presented in Table 7-1). The second column (2) presents forecast Year 2020 Without Project traffic conditions and the third column (3) identifies forecast Year 2020 With Project traffic conditions. The fourth column (4) indicates whether the traffic associated with the Project will have a significant impact based on the significant impact criteria mentioned in this report. The fifth column (5) presents the resultant level of service with the inclusion of recommended traffic improvements, where needed, to achieve an acceptable level of service.
8.1.1 Year 2020 Without Project Traffic Conditions
Review of column (2) of Table 8-1 indicates that for the Year 2020 Without Project traffic conditions, one (1) of the ten (10) key study intersections is forecast to operate at an unacceptable level of service during the AM and PM peak hours when compared to the LOS standards defined in this report. This intersection, reported below, is forecast to continue to operate at an adverse level of service during the peak hours indicated:
AM Peak Hour PM Peak Hour
Key Intersection Delay (s/v) LOS Delay (s/v) LOS
2. Temescal Canyon Road at Cajalco Road 63.4 E 62.8 E
The remaining nine (9) key study intersections are forecast to operate at acceptable levels of service during the AM and PM peak hours.
8.1.2 Year 2020 With Project Traffic Conditions
Review of column (3) of Table 8-1 indicates that for the Year 2020 With Project traffic conditions, one (1) of the ten (10) key study intersections is forecast to operate at an unacceptable level of service during the AM and PM peak hours when compared to the LOS standards defined in this report. This intersection, reported below, is forecast to continue to operate at an adverse level of service during the peak hours indicated:
LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2-12-3291-1 Planning Area 1 – Terrano at Dos Lagos, Corona
N:\3200\2123291 - Rexco Dos Lagos, Corona\Planning Area 1 - Terrano\Report\3291 - Planning Area 1 - Terrano at Dos Lagos, Corona TIA 05-21-18.doc 23 AM Peak Hour PM Peak Hour
Key Intersection Delay (s/v) LOS Delay (s/v) LOS
2. Temescal Canyon Road at Cajalco Road 66.0 E 66.2 E
The remaining nine (9) key study intersections are forecast to continue to operate at acceptable levels of service during the AM and PM peak hours.
Review of column (4) of Table 8-1 indicates that one (1) of the ten (10) key study intersections will be significantly impacted based on the LOS criteria defined in this report for the Year 2020 With Project traffic conditions. However, as shown in column (5) of Table 8-1, the implementation of the recommended improvements will offset the Project impacts and return the operating condition of the intersection to an acceptable level of service. The remaining key study intersections are projected to operate at acceptable service.
Appendix E contains the Delay/LOS calculation worksheets for the Year 2020 Traffic Conditions.
LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2-12-3291-1 Planning Area 1 – Terrano at Dos Lagos, Corona
N:\3200\2123291 - Rexco Dos Lagos, Corona\Planning Area 1 - Terrano\Report\3291 - Planning Area 1 - Terrano at Dos Lagos, Corona TIA 05-21-18.doc 24 TABLE 8-1
YEAR 2020 CONDITIONS PEAK HOUR INTERSECTION CAPACITY ANALYSIS SUMMARY14 Key Intersection
Minimum
Acceptable LOS
Time
Period
(1)
Existing
Traffic Conditions
(2)
Year 2020
Without Project
Traffic Conditions
(3)
Year 2020
With Project
Traffic Conditions
(4)
Significant
Impact
(5)
Year 2020
With Project
With Mitigation
Delay
(s/v) LOS
Delay
(s/v) LOS
Delay
(s/v) LOS Yes/No
Delay
(s/v) LOS
1. Grand Oaks at
D
AM 10.9 B 11.0 B 11.0 B No -- --
Cajalco Road PM 28.1 C 28.1 C 28.1 C No -- --
2. Temescal Canyon Road at
D
AM 43.7 D 63.4 E 66.0 E Yes 39.6 D
Cajalco Road PM 50.1 D 62.8 E 66.2 E Yes 54.8 D
3. Temescal Canyon Road at
D
AM 13.1 B 19.9 B 21.2 C No -- --
Blue Springs Drive PM 12.4 B 14.0 B 14.1 B No -- --
4. Temescal Canyon Road at
D
AM 7.3 A 9.4 A 9.8 A No -- --
Pronio Circle PM 5.1 A 7.9 A 7.9 A No -- --
5. Temescal Canyon Road at
D
AM 3.2 A 3.8 A 4.0 A No -- --
Lakeshore Drive PM 7.7 A 7.7 A 7.8 A No -- --
6. Temescal Canyon Road at
D
AM 12.7 B 14.5 B 15.1 B No -- --
Cabot Drive PM 14.6 B 14.6 B 14.4 B No -- --
7. Temescal Canyon Road at
D
AM 17.7 B 18.7 B 19.5 B No -- --
Dos Lagos Drive PM 26.9 C 28.7 C 29.7 C No -- --
Notes:
s/v = seconds per vehicle (delay)
LOS = Level of Service, please refer to Tables 3-1 and 3-2 for the LOS definitions Bold Delay/LOS values indicate adverse service levels based on the LOS standards mentioned in this report
14 Appendix E contains the Delay/LOS calculation worksheets for all study intersections.
LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2-12-3291-1 Planning Area 1 – Terrano at Dos Lagos, Corona
N:\3200\2123291 - Rexco Dos Lagos, Corona\Planning Area 1 - Terrano\Report\3291 - Planning Area 1 - Terrano at Dos Lagos, Corona TIA 05-21-18.doc 25 TABLE 8-1 (CONTINUED)
YEAR 2020 CONDITIONS PEAK HOUR INTERSECTION CAPACITY ANALYSIS SUMMARY15 Key Intersection
Minimum
Acceptable LOS
Time
Period
(1)
Existing
Traffic Conditions
(2)
Year 2020
Without Project
Traffic Conditions
(3)
Year 2020
With Project
Traffic Conditions
(4)
Significant
Impact
(5)
Year 2020
With Project
With Mitigation
Delay
(s/v) LOS
Delay
(s/v) LOS
Delay
(s/v) LOS Yes/No
Delay
(s/v) LOS
8. I-15 Northbound Ramps at
D
AM 19.6 B 22.0 C 21.7 C No -- --
Weirick Road/Dos Lagos Drive PM 17.7 B 22.2 C 21.8 C No -- --
9. I-15 Southbound Ramps at
D
AM 17.3 B 19.5 B 21.2 C No -- --
Weirick Road PM 25.0 C 25.4 C 27.0 C No -- --
10. Weirick Road/Knabe Road at
D
AM 33.4 C 36.0 D 35.8 D No -- --
Weirick Road/Retreat Parkway PM 36.1 D 37.3 D 39.3 D No -- -- Notes:
s/v = seconds per vehicle (delay)
LOS = Level of Service, please refer to Tables 3-1 and 3-2 for the LOS definitions Bold Delay/LOS values indicate adverse service levels based on the LOS standards mentioned in this report
15 Appendix E contains the Delay/LOS calculation worksheets for all study intersections.
LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2-12-3291-1 Planning Area 1 – Terrano at Dos Lagos, Corona
N:\3200\2123291 - Rexco Dos Lagos, Corona\Planning Area 1 - Terrano\Report\3291 - Planning Area 1 - Terrano at Dos Lagos, Corona TIA 05-21-18.doc 26 9.0 RECOMMENDED IMPROVEMENTS
For those intersections where projected traffic volumes are expected to result in unacceptable operating conditions, this report recommends improvement measures that change the intersection geometry to increase capacity. These capacity improvements may involve roadway widening and/or re-striping to reconfigure specific approaches of a key intersection. The identified improvements are expected to:
mitigate the impact of existing traffic, Project traffic and future non-Project (ambient traffic growth and cumulative projects) traffic and
improve Levels of Service to an acceptable range and/or to pre-Project conditions.
9.1 Existing With Project Traffic Conditions
The results of the Existing With Project intersection capacity analysis presented previously in Table 7-1 indicate that the proposed Project will not impact any of the key study intersections. As such, no improvements are recommended for the Existing With Project traffic conditions.
9.2 Year 2020 With Project Traffic Conditions
The results of the Year 2020 With Project intersection capacity analysis presented previously in Table 8-1 indicate that the proposed Project will impact one (1) of the key study intersections. The following improvements listed below have been identified to mitigate the traffic impacts at the intersection impacted by Project traffic:
Temescal Canyon Road at Cajalco Road: Restripe the northbound approach to provide a third exclusive northbound left-turn lane and restripe the shared northbound through/right-turn lane to an exclusive northbound right-turn lane. Install eastbound right-turn overlap traffic signal phasing that will yield to northbound U-turn movements.
Figure 9-1 presents the recommended improvements at the key study intersections for the Year 2020 With Project traffic conditions.
LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2-12-3291-1 Planning Area 1 – Terrano at Dos Lagos, Corona
N:\3200\2123291 - Rexco Dos Lagos, Corona\Planning Area 1 - Terrano\Report\3291 - Planning Area 1 - Terrano at Dos Lagos, Corona TIA 05-21-18.doc 27 10.0 PROJECT FAIR SHARE ANALYSIS
The transportation impacts associated with the development of the proposed Project were determined based on the future conditions analysis with and without the proposed Project. The key study locations forecast to operate at adverse levels of service are discussed below. As such, the proposed Project’s “fair-share” of the recommended traffic improvements has been calculated for the key study locations that are forecast to operate at adverse levels of service in the Year 2020 traffic conditions.
10.1 Existing With Project Traffic Conditions
None of the ten (10) key study intersections are forecast to have a significant impact under Existing With Project traffic conditions when compared to the LOS criteria defined in this report. Thus, no mitigation measures are necessary.
10.2 Year 2020 With Project Traffic Conditions
Table 10-1 presents the AM and PM peak hour Project fair share percentage at the key study intersections that are forecast to operate at adverse levels of service in the Year 2020 With Project traffic conditions. As presented in Table 10-1, the first column (1) presents the increase in intersection delay due to Project traffic only. The second column (2) presents the total intersection delay of the intersection. The third column (3) presents the acceptable LOS delay as defined in Chapter 19 of the Highway Capacity Manual 6. The fourth column (4) represents the Project’s fair share based on the following formula:
Project Fair Share (4) = Column (1)/[Column (2) – Column (3)]*100 The fifth column (5) presents the total estimated improvement cost for the recommended improvements. The sixth column (6) presents the Project’s fair share contribution, based on the fair share percentage and the total estimated improvement cost.
The Project fair share percentage (worse time period impacted) for the impacted intersection for the Year 2020 With Project traffic conditions is shown below:
Temescal Canyon Road at Cajalco Road 30.36%
As shown in Table 10-1, the Project’s fair share responsibility toward the restriping the northbound approach and the installation of an eastbound right-turn overlap is 30.36%. As the total cost of the improvements is estimated to be $20,000, the Project’s fair share contribution is approximately $6,072.00.
LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2-12-3291-1 Planning Area 1 – Terrano at Dos Lagos, Corona
N:\3200\2123291 - Rexco Dos Lagos, Corona\Planning Area 1 - Terrano\Report\3291 - Planning Area 1 - Terrano at Dos Lagos, Corona TIA 05-21-18.doc 28 TABLE 10-1
YEAR 2020 INTERSECTION FAIR SHARE CONTRIBUTION
Key Intersection
Impacted
Time
Period
(1) (2) (3) (4) (5) (6)
Project Only
Delay
Increase
(s/v)
Total
Delay of
Intersection
(s/v)
Maximum
Acceptable
Delay at
LOS D (s/v)
Project
Fair Share
Responsibility
Total
Improvement
Cost
Project
Fair Share
Contribution
2. Temescal Canyon Road at AM 2.6 66.0 55.0 23.64%
$20,000.00 $6,072.00
Cajalco Road PM 3.4 66.2 55.0 30.36%
Notes:
Net Project Percent Increase (4) = Column (1) / [Column (2) – Column (3)] Bold Project Fair Share Responsibility is based on worse case LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2-12-3291-1 Planning Area 1 – Terrano at Dos Lagos, Corona
N:\3200\2123291 - Rexco Dos Lagos, Corona\Planning Area 1 - Terrano\Report\3291 - Planning Area 1 - Terrano at Dos Lagos, Corona TIA 05-21-18.doc 29 11.0 SITE ACCESS AND INTERNAL CIRCULATION ANALYSIS
11.1 Site Access
As previously detailed, Project access will be provided via three (3) driveways along Temescal Canyon Road and one (1) driveway along Dos Lagos Drive. Driveways 1 and 3 (located along Temescal Canyon Road) and Driveway 4 (located along Dos Lagos Road) will be stop-controlled right-in/right-out only driveways, while Driveway 2 (located along Temescal Canyon Road) will be a signalized (six-phase) full movement driveway.
11.1.1 Year 2020 With Project Traffic Conditions
Table 11-1 summarizes the levels of service at the Project driveways for Year 2020 With Project traffic conditions. The operations analysis for the Project access is based on the Highway Capacity Manual 6 (HCM 6) Method of Analysis for unsignalized intersections. As shown in column (1) of Table 11-1 the Project access is forecast to operate at acceptable levels of service during the AM and PM peak hours under the Year 2020 With Project traffic conditions. Appendix F contains the Delay/LOS calculation worksheets for the Year 2020 With Project Traffic Conditions.
11.2 Internal Circulation
The on-site circulation was evaluated in terms of vehicle-pedestrian conflicts. Based on our review of the preliminary site plan, the overall layout does not create significant vehicle-pedestrian conflict points such that access for the residential and commercial components are not impacted by internal vehicle queuing/stacking. Project traffic is not anticipated to cause significant internal queuing/ stacking at the Project driveway. The on-site circulation is acceptable based on our review of the proposed site plan. The alignment and spacing of the Project driveway is also deemed adequate.
Turning movements into and out of the Project site at the Project driveway are anticipated to operate at an acceptable service levels. As such, motorists entering and exiting the Project site from this driveway will be able to do so comfortably, safely, and without undue congestion.
LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2-12-3291-1 Planning Area 1 – Terrano at Dos Lagos, Corona
N:\3200\2123291 - Rexco Dos Lagos, Corona\Planning Area 1 - Terrano\Report\3291 - Planning Area 1 - Terrano at Dos Lagos, Corona TIA 05-21-18.doc 30 TABLE 11-1
PROJECT ACCESS PEAK HOUR CAPACITY ANALYSIS SUMMARY16
Project Driveway
Time
Period
(1)
Year 2020
With Project
Traffic Conditions
Delay
(s/v) LOS
A. Temescal Canyon Road at Project Driveway 1
AM 9.2 A
PM 14.5 B
B. Temescal Canyon Road at Project Driveway 2
AM 17.1 B
PM 16.9 B
C. Temescal Canyon Road at Project Driveway 3
AM 9.3 A
PM 13.3 B
D. Project Driveway 4 at Dos Lagos Drive
AM 9.4 A
PM 11.9 B
Notes:
s/v = seconds per vehicle (delay).
LOS = Level of Service, please refer to Table 3-2 for the LOS definitions. Bold Delay/LOS values indicate unacceptable service levels.
16 Appendix F contains the Delay/LOS calculation worksheets for the Project driveway.
LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2-12-3291-1 Planning Area 1 – Terrano at Dos Lagos, Corona
N:\3200\2123291 - Rexco Dos Lagos, Corona\Planning Area 1 - Terrano\Report\3291 - Planning Area 1 - Terrano at Dos Lagos, Corona TIA 05-21-18.doc 31 12.0 INTERSECTION QUEUE LENGTH ANALYSIS
To address City staff concerns regarding left-turn and right-turn stacking/storage lengths at several locations, a queuing evaluation was prepared for the following movements:
Temescal Canyon Road at Project Driveway 1
o Eastbound Right-turn
Temescal Canyon Road at Project Driveway 2
o Northbound Left-turn
o Southbound Right-turn
o Eastbound Left-turn
Project Driveway 4 at Dos Lagos Drive
o Southbound Right-turn
Table 12-1 identifies the minimum required stacking/storage lengths for affected left-turn and rightturn lanes for the Project driveways for the Existing With Project and Year 2020 With Project traffic conditions. Column (1) shows the existing or proposed storage length, in feet. Column (2) shows the left-turn or right-turn queue (in vehicles per lane), the corresponding required storage necessary to accommodate the vehicles (in feet, assuming 25 feet per vehicle), and indicates whether or not the existing storage is sufficient based on the calculated 95th percentile queue for Existing With Project traffic conditions. Column (3) shows the left-turn or right-turn queue (in vehicles per lane), the corresponding required storage necessary to accommodate the vehicles (in feet, assuming 25 feet per vehicle), and indicates whether or not the existing storage is sufficient based on the calculated 95th percentile queue, for Year 2020 With Project traffic conditions.
12.1 Existing With Project Intersection Queuing Evaluation As presented in Column (2) of Table 12-1 under Existing With Project traffic conditions, all existing or proposed left-turn or right-turn storage is sufficient at the Project driveways along Temescal Canyon Road and Dos Lagos Drive.
12.2 Year 2020 With Project Intersection Queuing Evaluation As presented in Column (3) of Table 12-1 under Year 2020 With Project traffic conditions, all existing or proposed left-turn or right-turn storage is sufficient at the Project driveways along Temescal Canyon Road and Dos Lagos Drive.
LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2-12-3291-1 Planning Area 1 – Terrano at Dos Lagos, Corona
N:\3200\2123291 - Rexco Dos Lagos, Corona\Planning Area 1 - Terrano\Report\3291 - Planning Area 1 - Terrano at Dos Lagos, Corona TIA 05-21-18.doc 32 TABLE 12-1
PROJECT DRIVEWAY QUEUE LENGTH ANALYSIS17
Key Intersection Approach
Time
Period
(1) (2)
Existing
With Project
Traffic Conditions
(3)
Year 2020
With Project
Traffic Conditions
Existing/
Proposed
Storage
Length
(ft)
95th
Percentile
Queue
(vpl)
Minimum
Required
Storage
Length (ft)
Existing
Storage
Sufficient?
(yes/no)
95th
Percentile
Queue
(vpl)
Minimum
Required
Storage
Length (ft)
Existing
Storage
Sufficient?
(yes/no)
A.
Temescal Canyon Road at
EBR
AM 85 1 25 Yes 1 25 Yes
Project Driveway 1 PM 85 1 25 Yes 1 25 Yes
B.
NBL
AM 220 6 150 Yes 7 175 Yes
PM 220 7 175 Yes 7 175 Yes
Temescal Canyon Road at
SBR
AM 150 1 25 Yes 1 25 Yes
Project Driveway 2 PM 150 1 25 Yes 1 25 Yes
EBL
AM 110 2 50 Yes 3 75 Yes
PM 110 2 50 Yes 2 50 Yes
D.
Project Driveway 4 at
SBR
AM 60 1 25 Yes 1 25 Yes
Dos Lagos Drive PM 60 1 25 Yes 1 25 Yes
17 Appendices D and E contain the Delay/LOS calculation worksheets which show the 95th percentile queuing. 42428 Chisolm Trail, Murrieta CA 92562 phone 760-473-1253 www.ldnconsulting.net fax 760-689-4943
1/31/2023 22-161 Terrano II AQ 1
January 31, 2023
Matt McKinlay
Rexco Development
1285 Corona Pointe Court Suite 102
Corona, CA 92879
RE: Terrano II Multi-Family Development at Dos Lagos Air Quality – City of Corona The purpose of this air quality screening letter is to identify air quality impacts, if any, which may be created from the construction and operation of the proposed 50-unit Apartment complex on a 2.96 acre project site within Planning Area 1 of the Dos Lagos Specific Plan. The site is located on the west of Temescal Canyon Road and north of Dos Lagos Drive in the City of Corona.
Planning Area 1 of the Dos Lagos Specific Plan was entitled in 2018 and included a 276-unit apartment complex, a 107 room hotel, 6,100 square-feet (SF) of commercial uses, 10,300 SF of restaurant uses (4,000 SF quality restaurant use and 6,300 SF high-turnover sit-down restaurant use), and a 20-fueling position gas station with convenience store and car wash, of which the apartment complex, hotel, and gas station are completed and opened.
The proposed Project consists of replacing the entitled retail and restaurant uses with 50 multifamily (low-rise) apartment dwelling units within eight (8) buildings. In addition, the Project would not install fireplaces or hearths of any type. Access for the proposed apartments will be provided via the existing internal circulation system and no new public access driveway are proposed. This project is the last development piece to Planning Area 1 of the Dos Lagos Specific Plan.
Construction within Dos Lagos Planning Area 1 is generally completed with the exception of this remaining lot. Construction would start early 2024 and be completed less than one year later.
Once construction is completed the proposed project would generate operational air quality emissions. These operational emissions would originate from daily vehicle operations, use of consumer products, and from landscaping equipment.
Matt McKinlay
Rexco Development
1285 Corona Pointe Court Suite 102
Corona, CA 92879
42428 Chisolm Trail, Murrieta CA 92562
phone 760-473-1253
Fax 760-689-4943
1/31/2023 22-161 Terrano II AQ 2
Air quality impacts related to construction and daily operations were calculated using the latest CalEEMod 2020.4.0 air quality and GHG model, which was developed by Breeze Software for South Coast Air Quality Management District (SCAQMD). The City of Corona recognizes the CalEEMod Version 2020.4.0 as an acceptable model for projects of this nature. The Air Quality modeling is proved as Attachment A to this report.
Regional Air Quality Significance Thresholds
Regional Air quality screening criteria for the City of Corona utilize South Coast Air Quality Management District’s (SQAQMD) Air Quality Thresholds. The screening thresholds for construction and daily operations are shown in Table 1.
Table 1: City of Corona Regional Air Quality Significance Thresholds Pollutant Total Emissions (Pounds per Day)
Construction Emissions
Respirable Particulate Matter (PM10 / PM2.5) 150 / 55
Nitrogen Oxide (NOx) 100
Sulfur Oxide (SOx) 150
Carbon Monoxide (CO) 550
Reactive Organic Gases (ROG) SCAQMD 75
Operational Emissions
Pollutant Total Emissions (Pounds per Day)
Respirable Particulate Matter (PM10 / PM2.5) 150 / 55
Nitrogen Oxide (NOx) 55
Sulfur Oxide (SOx) 150
Carbon Monoxide (CO) 550
Reactive Organic Gases (ROG) SCAQMD 55
Localized Significance Thresholds
In June 2003 the SCAQMD proposed a methodology for calculating Localized Significance Thresholds (LSTs) for NO2, CO, PM2.5 and PM10. The LST methodology was developed to be used as a tool to assist lead agencies to analyze localized impacts associated with project-specific level proposed projects and would not be applicable to regional projects such as general plans.
The LST methodology was last updated to incorporate the most recent ambient air quality Matt McKinlay
Rexco Development
1285 Corona Pointe Court Suite 102
Corona, CA 92879
42428 Chisolm Trail, Murrieta CA 92562
phone 760-473-1253
Fax 760-689-4943
1/31/2023 22-161 Terrano II AQ 3
standards (July 2008). (South Coast Air Quality Management District, 2008). The LST methodology is often utilized by most agencies governed under SCAQMD CEQA review. SCAQMD developed mass rate look-up tables for projects to assist agencies with development of LSTs (South Coast Air Quality Management District, 2014).
Per the requirements of SCAQMDs LSTs methodology, emissions for gases in attainment such as NO2 and CO are calculated by adding emission impacts from the project development to the peak background ambient NO2 and CO concentrations and comparing the total concentration to the most stringent ambient air quality standards. Also, according to SCAQMD Rule 403, emissions for non-attainment particulate matter such as PM 10 and PM 2.5 can produce no more than 10.4 µg/m3
. The LSTs derived by SCAQMD differentiated by Source Receptor area for which the proposed Project is would be represented by SRA #22 within the City of Corona. The Project was analyzed using a worst-case construction schedule using the appropriate equipment and quantities for this scenario. The Project site would not actively disturb more than 2 acres at any given time. Table 2 shows the worst-case Project LST at 25 meters (SCAQMD, 2009).
Table 2: LST Emission Thresholds
Pollutant LST @ 25 meters
(lb/day)
CO (Corrected utilizing NO2/NOx Ratio) Construction and Operation 1,007 PM10 (Construction) 6
PM10 (Operation) 2
PM2.5 (Construction) 5
PM2.5 (Operation) 2
NO2 (Corrected utilizing NO2/NOx Ratio) Construction and Operation 170 Project Related Construction Emissions
Construction of the project would begin shortly after the approval of the Proposed Project subdivision. Mass grading of the lot has been previously completed as part of the master plan so all grading necessary will be minimal and would mainly consist of footing preparations and finish grading, paving and architectural coating. This analysis assumes construction begins in 2024 and would be completed in less than one year. CalEEMod default settings were used which are based on the project site size and number of units proposed. These inputs would be conservative since limited grading is required. The proposed construction schedule and construction equipment list is identified in Table 3.
Matt McKinlay
Rexco Development
1285 Corona Pointe Court Suite 102
Corona, CA 92879
42428 Chisolm Trail, Murrieta CA 92562
phone 760-473-1253
Fax 760-689-4943
1/31/2023 22-161 Terrano II AQ 4
Table 3: Proposed Construction Phase and Duration
Equipment Identification Proposed Start Proposed
Completion Quantity
Site Preparation 1/1/2024 1/3/2024
Graders 1
Tractors/Loaders/Backhoes 1
Grading 1/4/2024 1/11/2024
Graders 1
Rollers 1
Tractors/Loaders/Backhoes 2
Building Construction 1/12/2024 11/14/2024
Cranes 1
Forklifts 2
Generator Sets 1
Tractors/Loaders/Backhoes 1
Welders 3
Paving 11/15/2024 11/28/2024
Pavers 1
Paving Equipment 1
Rollers 2
Architectural Coating 11/15/2024 11/28/2024
Air Compressors 1
This equipment list is based upon equipment inventory and estimates within CalEEMod using default settings.
Based on the modeling within CalEEMod, the construction emissions, which are reported in lbs/day, are shown in Table 4. Based on these findings, the project construction activities would have a less than significant regional air quality impacts and a less than significant localized impacts.
Matt McKinlay
Rexco Development
1285 Corona Pointe Court Suite 102
Corona, CA 92879
42428 Chisolm Trail, Murrieta CA 92562
phone 760-473-1253
Fax 760-689-4943
1/31/2023 22-161 Terrano II AQ 5
Table 4: Expected Daily Construction Emissions Summary Lb/Day Year ROG NOx CO SO2
PM10
(Dust)
PM10
(Exhaust)
PM10
(Total)
PM2.5
(Dust)
PM2.5
(Exhaust)
PM2.5
(Total)
2024 (lb/day) 32.91 13.21 15.77 0.03 0.64 0.54 1.10 0.15 0.52 0.67 Significance
Threshold
(lb/day)
75 100 550 150 - - 150 - - 55
Localized
Significance
Threshold
170 1,007 6 5
SCAQMD/LST
Impact? No No No No - - No - - No
Expected Construction emissions are based upon CalEEMod modeling assumptions for equipment and durations listed in Table 2 above.
CalEEMod Daily Summer and Winter output is attached to this letter.
Project Related Operational Emissions
As previously discussed, operational emissions from Area, Energy, Mobile sources are also calculated within CalEEMod. The program is largely based on default settings which are automatically populated throughout the model based on the imputed land use. Southern California Edison averages for utility emissions were utilized for the calculations throughout the model. The model assumes that residential units includes a mix of various hearth options. Since the Project would not install hearth options, all hearths were removed from the model.
Traffic Generation was estimated to be 337 average daily trips (LL&G, 2023) and was utilized within CalEEMod. The calculated operational emissions are identified in Table 5 below. In addition, Table 4 include regional SCAQMD significance thresholds and LSTs.
CalEEMod utilized the proposed land use and then estimates worst-case air quality emissions from trip generations built into the model and include vehicle emission rates from EMFAC. The EMFAC model is built into the CalEEMod software. Estimates are provided for both the Summer and Winter operational months.
Based on the findings of the Air Quality modeling in CalEEMod daily operational activities would generate less than significant LST impact and would also generate less than significant regional air quality impacts.
Matt McKinlay
Rexco Development
1285 Corona Pointe Court Suite 102
Corona, CA 92879
42428 Chisolm Trail, Murrieta CA 92562
phone 760-473-1253
Fax 760-689-4943
1/31/2023 22-161 Terrano II AQ 6
Table 5: Expected Daily Operational Air Quality Emissions ROG NOx CO SOx PM10 PM2.5
Summer Scenario
Onsite Operational Emissions
(Lb/Day) 1.21 0.05 4.13 0 0.02 0.02
Onsite Energy Source Emissions
(Lb/Day) 0.02 0.19 0.08 0 0.02 0.02
Total Onsite Emissions Only
(Lb/Day) 1.23 0.24 4.21 0 0.04 0.04
Localized Significance Threshold 170 1,007 2 2
LST Impact? No No No No No No
Offsite Operational Vehicle
Emissions (Lb/Day) 1.01 1.29 9.85 0.02 2.45 0.67
Total Emissions (Lb/Day) 2.24 1.53 14.06 0.02 2.49 0.71 SCAQMD Thresholds 55 55 550 150 150 55
SCAQMD Impact? No No No No No No
Winter Scenario
Onsite Operational Emissions
(Lb/Day) 1.21 0.05 4.13 0 0.02 0.02
Onsite Energy Source Emissions
(Lb/Day) 0.02 0.19 0.08 0 0.02 0.02
Total Onsite Emissions Only
(Lb/Day) 1.23 0.24 4.21 0 0.04 0.04
Localized Significance Threshold 170 1,007 2 2
LST Impact? No No No No No No
Offsite Operational Vehicle
Emissions (Lb/Day) 0.86 1.37 8.72 0.02 2.45 0.67
Total Emissions (Lb/Day) 2.09 1.61 12.93 0.02 2.49 0.71 SCAQMD Thresholds 55 55 550 150 150 55
SCAQMD Impact? No No No No No No
Daily pollutant generation assumes trip distances and defaults within CalEEMod Based on these findings, no impacts are anticipated and no further analysis is required. If you have any questions, please do not hesitate to contact me directly at (760) 473-1253.
Sincerely,
Ldn Consulting, Inc.
Jeremy Louden
Matt McKinlay
Rexco Development
1285 Corona Pointe Court Suite 102
Corona, CA 92879
42428 Chisolm Trail, Murrieta CA 92562
phone 760-473-1253
Fax 760-689-4943
1/31/2023 22-161 Terrano II AQ 7
Attachment A: CalEEMod Model Results
References:
LL&G. (2023). Traffic Circuation Assessment for the Proposed Terrano II Apartments at Dos Lagos.
SCAQMD. (2009, Oct 21). Localized Significance Thresholds Lookup Tables. Retrieved 2015, from http://www.aqmd.gov/docs/default-source/ceqa/handbook/localized-significancethresholds/appendix-c-mass-rate-lst-look-up-tables.pdf?sfvrsn=2 South Coast Air Quality Management District. (2008, July). Finalized Localized Significance Threshold Methodology. Retrieved from http://www.aqmd.gov/docs/defaultsource/ceqa/handbook/localized-significance-thresholds/final-lst-methodologydocument.pdf South Coast Air Quality Management District. (2014). Localized Significance Thresholds.
Retrieved 2014, from http://www.aqmd.gov/home/rules-compliance/ceqa/air-qualityanalysis-handbook/localized-significance-thresholds Terrrano II Apartments
Riverside-South Coast County, Summer
Project Characteristics -
Land Use - 2.96 acres
Construction Phase -
Off-road Equipment -
Off-road Equipment -
Off-road Equipment -
Off-road Equipment -
Off-road Equipment -
Grading -
Vehicle Trips - per TS
Construction Off-road Equipment Mitigation -
1.1 Land Usage
Land Uses Size Metric Lot Acreage Floor Surface Area Population Apartments Low Rise 50.00 Dwelling Unit 2.47 50,000.00 143 Parking Lot 55.00 Space 0.49 22,000.00 0
1.2 Other Project Characteristics
Urbanization
Climate Zone
Urban
10 Wind Speed (m/s) 2.4 Precipitation Freq (Days) 28
1.3 User Entered Comments & Non-Default Data
1.0 Project Characteristics
Utility Company Southern California Edison
Operational Year 2025
CO2 Intensity
(lb/MWhr)
390.98 CH4 Intensity 0.033
(lb/MWhr)
N2O Intensity 0.004
(lb/MWhr)
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 23 Date: 1/28/2023 1:57 PM Terrrano II Apartments - Riverside-South Coast County, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied Woodstoves - No hearth options will be provided
2.0 Emissions Summary
Table Name Column Name Default Value New Value
tblConstructionPhase PhaseEndDate 12/12/2024 11/28/2024 tblConstructionPhase PhaseStartDate 11/29/2024 11/15/2024 tblFireplaces NumberGas 42.50 0.00
tblFireplaces NumberNoFireplace 5.00 50.00
tblFireplaces NumberWood 2.50 0.00
tblLandUse LotAcreage 3.13 2.47
tblOffRoadEquipment LoadFactor 0.38 0.38
tblOffRoadEquipment OffRoadEquipmentType Rollers
tblVehicleTrips ST_TR 8.14 6.74
tblVehicleTrips SU_TR 6.28 6.74
tblVehicleTrips WD_TR 7.32 6.74
tblWoodstoves NumberCatalytic 2.50 0.00
tblWoodstoves NumberNoncatalytic 2.50 0.00
CalEEMod Version: CalEEMod.2020.4.0 Page 2 of 23 Date: 1/28/2023 1:57 PM Terrrano II Apartments - Riverside-South Coast County, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
2.1 Overall Construction (Maximum Daily Emission)
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Year lb/day lb/day
2024 32.9117 13.2081 15.7656 0.0309 0.6420 0.5429 1.1035 0.1500 0.5198 0.6698 0.0000 2,895.694 6 2,895.694
6 0.4590 0.0340 2,916.775
3 Maximum 32.9117 13.2081 15.7656 0.0309 0.6420 0.5429 1.1035 0.1500 0.5198 0.6698 0.0000 2,895.694 6 2,895.694
6 0.4590 0.0340 2,916.775
3 Unmitigated Construction
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Year lb/day lb/day
2024 32.9117 13.2081 15.7656 0.0309 0.5606 0.5429 1.1035 0.1500 0.5198 0.6698 0.0000 2,895.694 6 2,895.694
6 0.4590 0.0340 2,916.775
3 Maximum 32.9117 13.2081 15.7656 0.0309 0.5606 0.5429 1.1035 0.1500 0.5198 0.6698 0.0000 2,895.694 6 2,895.694
6 0.4590 0.0340 2,916.775
3 Mitigated Construction
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e
Percent
Reduction
0.00 0.00 0.00 0.00 12.68 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 CalEEMod Version: CalEEMod.2020.4.0 Page 3 of 23 Date: 1/28/2023 1:57 PM Terrrano II Apartments - Riverside-South Coast County, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
2.2 Overall Operational
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Area 1.2094 0.0475 4.1268 2.2000e0040.0229 0.0229 0.0229 0.0229 0.0000 7.4397 7.4397 7.1400e0030.0000 7.6183 Energy 0.0224 0.1910 0.0813 1.2200e0030.0154 0.0154 0.0154 0.0154 243.7697 243.7697 4.6700e0034.4700e003245.2183 Mobile 1.0055 1.2879 9.8477 0.0231 2.4328 0.0176 2.4503 0.6490 0.0165 0.6654 2,408.423 6 2,408.423
6 0.1110 0.1069 2,443.040
8 Total 2.2373 1.5264 14.0557 0.0245 2.4328 0.0559 2.4887 0.6490 0.0548 0.7038 0.0000 2,659.633 0 2,659.633
0 0.1228 0.1113 2,695.877
3 Unmitigated Operational
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Area 1.2094 0.0475 4.1268 2.2000e0040.0229 0.0229 0.0229 0.0229 0.0000 7.4397 7.4397 7.1400e0030.0000 7.6183 Energy 0.0224 0.1910 0.0813 1.2200e0030.0154 0.0154 0.0154 0.0154 243.7697 243.7697 4.6700e0034.4700e003245.2183 Mobile 1.0055 1.2879 9.8477 0.0231 2.4328 0.0176 2.4503 0.6490 0.0165 0.6654 2,408.423 6 2,408.423
6 0.1110 0.1069 2,443.040
8 Total 2.2373 1.5264 14.0557 0.0245 2.4328 0.0559 2.4887 0.6490 0.0548 0.7038 0.0000 2,659.633 0 2,659.633
0 0.1228 0.1113 2,695.877
3 Mitigated Operational
CalEEMod Version: CalEEMod.2020.4.0 Page 4 of 23 Date: 1/28/2023 1:57 PM Terrrano II Apartments - Riverside-South Coast County, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.0 Construction Detail
Construction Phase
Phase
Number
Phase Name Phase Type Start Date End Date Num Days
Week
Num Days Phase Description
1 Site Preparation Site Preparation 1/1/2024 1/3/2024 5 3 2 Grading Grading 1/4/2024 1/11/2024 5 6
3 Building Construction Building Construction 1/12/2024 11/14/2024 5 220 4 Paving Paving 11/15/2024 11/28/2024 5 10
5 Architectural Coating Architectural Coating 11/15/2024 11/28/2024 5 10 OffRoad Equipment
Phase Name Offroad Equipment Type Amount Usage Hours Horse Power Load Factor Architectural Coating Air Compressors 1 6.00 78 0.48
Grading Rollers 1 7.00 80 0.38
Building Construction Cranes 1 8.00 231 0.29
Building Construction Forklifts 2 7.00 89 0.20
Building Construction Generator Sets 1 8.00 84 0.74
Grading Graders 1 8.00 187 0.41
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e
Percent
Reduction
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Residential Indoor: 101,250; Residential Outdoor: 33,750; Non-Residential Indoor: 0; Non-Residential Outdoor: 0; Striped Parking Area: 1,320 (Architectural Coating – sqft)
Acres of Grading (Site Preparation Phase): 1.5
Acres of Grading (Grading Phase): 3
Acres of Paving: 0.49
CalEEMod Version: CalEEMod.2020.4.0 Page 5 of 23 Date: 1/28/2023 1:57 PM Terrrano II Apartments - Riverside-South Coast County, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.1 Mitigation Measures Construction
Water Exposed Area
Site Preparation Graders 1 8.00 187 0.41
Paving Pavers 1 8.00 130 0.42
Paving Paving Equipment 1 8.00 132 0.36
Paving Rollers 2 8.00 80 0.38
Building Construction Tractors/Loaders/Backhoes 1 6.00 97 0.37 Grading Tractors/Loaders/Backhoes 2 7.00 97 0.37
Site Preparation Tractors/Loaders/Backhoes 1 7.00 97 0.37 Building Construction Welders 3 8.00 46 0.45
Trips and VMT
Phase Name Offroad Equipment
Count
Worker Trip
Number
Vendor Trip
Number
Hauling Trip
Number
Worker Trip
Length
Vendor Trip
Length
Hauling Trip
Length
Worker Vehicle
Class
Vendor
Vehicle Class
Hauling
Vehicle Class
Architectural Coating 1 9.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT Building Construction 8 45.00 9.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT Grading 4 10.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT Paving 4 10.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT Site Preparation 2 5.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT CalEEMod Version: CalEEMod.2020.4.0 Page 6 of 23 Date: 1/28/2023 1:57 PM Terrrano II Apartments - Riverside-South Coast County, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.2 Site Preparation - 2024
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Fugitive Dust 0.5303 0.0000 0.5303 0.0573 0.0000 0.0573 0.0000 0.0000 Off-Road 0.4805 5.4229 3.6126 9.3400e0030.1929 0.1929 0.1775 0.1775 904.5534 904.5534 0.2926 911.8671 Total 0.4805 5.4229 3.6126 9.3400e0030.5303 0.1929 0.7232 0.0573 0.1775 0.2347 904.5534 904.5534 0.2926 911.8671 Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0170 0.0101 0.1718 4.8000e0040.0559 2.5000e0040.0561 0.0148 2.3000e0040.0151 49.0963 49.0963 1.0400e0031.0900e00349.4470 Total 0.0170 0.0101 0.1718 4.8000e0040.0559 2.5000e0040.0561 0.0148 2.3000e0040.0151 49.0963 49.0963 1.0400e0031.0900e00349.4470 Unmitigated Construction Off-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 7 of 23 Date: 1/28/2023 1:57 PM Terrrano II Apartments - Riverside-South Coast County, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.2 Site Preparation - 2024
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Fugitive Dust 0.2386 0.0000 0.2386 0.0258 0.0000 0.0258 0.0000 0.0000 Off-Road 0.4805 5.4229 3.6126 9.3400e0030.1929 0.1929 0.1775 0.1775 0.0000 904.5534 904.5534 0.2926 911.8671 Total 0.4805 5.4229 3.6126 9.3400e0030.2386 0.1929 0.4315 0.0258 0.1775 0.2033 0.0000 904.5534 904.5534 0.2926 911.8671 Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0170 0.0101 0.1718 4.8000e0040.0559 2.5000e0040.0561 0.0148 2.3000e0040.0151 49.0963 49.0963 1.0400e0031.0900e00349.4470 Total 0.0170 0.0101 0.1718 4.8000e0040.0559 2.5000e0040.0561 0.0148 2.3000e0040.0151 49.0963 49.0963 1.0400e0031.0900e00349.4470 Mitigated Construction Off-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 8 of 23 Date: 1/28/2023 1:57 PM Terrrano II Apartments - Riverside-South Coast County, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.3 Grading - 2024
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Fugitive Dust 0.5303 0.0000 0.5303 0.0573 0.0000 0.0573 0.0000 0.0000 Off-Road 0.7324 8.0071 7.1671 0.0143 0.3208 0.3208 0.2951 0.2951 1,388.167 8 1,388.167
8 0.4490 1,399.391
8 Total 0.7324 8.0071 7.1671 0.0143 0.5303 0.3208 0.8510 0.0573 0.2951 0.3524 1,388.167 8 1,388.167
8 0.4490 1,399.391
8 Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0341 0.0201 0.3435 9.5000e0040.1118 5.0000e0040.1123 0.0296 4.6000e0040.0301 98.1926 98.1926 2.0800e0032.1800e00398.8941 Total 0.0341 0.0201 0.3435 9.5000e0040.1118 5.0000e0040.1123 0.0296 4.6000e0040.0301 98.1926 98.1926 2.0800e0032.1800e00398.8941 Unmitigated Construction Off-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 9 of 23 Date: 1/28/2023 1:57 PM Terrrano II Apartments - Riverside-South Coast County, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.3 Grading - 2024
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Fugitive Dust 0.2386 0.0000 0.2386 0.0258 0.0000 0.0258 0.0000 0.0000 Off-Road 0.7324 8.0071 7.1671 0.0143 0.3208 0.3208 0.2951 0.2951 0.0000 1,388.167 8 1,388.167
8 0.4490 1,399.391
8 Total 0.7324 8.0071 7.1671 0.0143 0.2386 0.3208 0.5594 0.0258 0.2951 0.3209 0.0000 1,388.167 8 1,388.167
8 0.4490 1,399.391
8 Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0341 0.0201 0.3435 9.5000e0040.1118 5.0000e0040.1123 0.0296 4.6000e0040.0301 98.1926 98.1926 2.0800e0032.1800e00398.8941 Total 0.0341 0.0201 0.3435 9.5000e0040.1118 5.0000e0040.1123 0.0296 4.6000e0040.0301 98.1926 98.1926 2.0800e0032.1800e00398.8941 Mitigated Construction Off-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 10 of 23 Date: 1/28/2023 1:57 PM Terrrano II Apartments - Riverside-South Coast County, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.4 Building Construction - 2024
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 1.5971 12.8235 14.1002 0.0250 0.5381 0.5381 0.5153 0.5153 2,289.654 1 2,289.654
1 0.4265 2,300.315
4 Total 1.5971 12.8235 14.1002 0.0250 0.5381 0.5381 0.5153 0.5153 2,289.654 1 2,289.654
1 0.4265 2,300.315
4 Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 9.9900e0030.2941 0.1197 1.5500e0030.0576 2.5400e0030.0602 0.0166 2.4300e0030.0190 164.1740 164.1740 1.7600e0030.0242 171.4366 Worker 0.1533 0.0905 1.5458 4.2800e0030.5030 2.2600e0030.5053 0.1334 2.0800e0030.1355 441.8665 441.8665 9.3600e0039.8100e003445.0234 Total 0.1633 0.3846 1.6655 5.8300e0030.5606 4.8000e0030.5654 0.1500 4.5100e0030.1545 606.0405 606.0405 0.0111 0.0340 616.4600 Unmitigated Construction Off-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 11 of 23 Date: 1/28/2023 1:57 PM Terrrano II Apartments - Riverside-South Coast County, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.4 Building Construction - 2024
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 1.5971 12.8235 14.1002 0.0250 0.5381 0.5381 0.5153 0.5153 0.0000 2,289.654 1 2,289.654
1 0.4265 2,300.315
4 Total 1.5971 12.8235 14.1002 0.0250 0.5381 0.5381 0.5153 0.5153 0.0000 2,289.654 1 2,289.654
1 0.4265 2,300.315
4 Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 9.9900e0030.2941 0.1197 1.5500e0030.0576 2.5400e0030.0602 0.0166 2.4300e0030.0190 164.1740 164.1740 1.7600e0030.0242 171.4366 Worker 0.1533 0.0905 1.5458 4.2800e0030.5030 2.2600e0030.5053 0.1334 2.0800e0030.1355 441.8665 441.8665 9.3600e0039.8100e003445.0234 Total 0.1633 0.3846 1.6655 5.8300e0030.5606 4.8000e0030.5654 0.1500 4.5100e0030.1545 606.0405 606.0405 0.0111 0.0340 616.4600 Mitigated Construction Off-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 12 of 23 Date: 1/28/2023 1:57 PM Terrrano II Apartments - Riverside-South Coast County, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.5 Paving - 2024
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 0.6398 6.2866 9.1629 0.0140 0.3149 0.3149 0.2897 0.2897 1,357.919 3 1,357.919
3 0.4392 1,368.898
8 Paving 0.1284 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.7682 6.2866 9.1629 0.0140 0.3149 0.3149 0.2897 0.2897 1,357.919 3 1,357.919
3 0.4392 1,368.898
8 Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0341 0.0201 0.3435 9.5000e0040.1118 5.0000e0040.1123 0.0296 4.6000e0040.0301 98.1926 98.1926 2.0800e0032.1800e00398.8941 Total 0.0341 0.0201 0.3435 9.5000e0040.1118 5.0000e0040.1123 0.0296 4.6000e0040.0301 98.1926 98.1926 2.0800e0032.1800e00398.8941 Unmitigated Construction Off-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 13 of 23 Date: 1/28/2023 1:57 PM Terrrano II Apartments - Riverside-South Coast County, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.5 Paving - 2024
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 0.6398 6.2866 9.1629 0.0140 0.3149 0.3149 0.2897 0.2897 0.0000 1,357.919 3 1,357.919
3 0.4392 1,368.898
8 Paving 0.1284 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.7682 6.2866 9.1629 0.0140 0.3149 0.3149 0.2897 0.2897 0.0000 1,357.919 3 1,357.919
3 0.4392 1,368.898
8 Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0341 0.0201 0.3435 9.5000e0040.1118 5.0000e0040.1123 0.0296 4.6000e0040.0301 98.1926 98.1926 2.0800e0032.1800e00398.8941 Total 0.0341 0.0201 0.3435 9.5000e0040.1118 5.0000e0040.1123 0.0296 4.6000e0040.0301 98.1926 98.1926 2.0800e0032.1800e00398.8941 Mitigated Construction Off-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 14 of 23 Date: 1/28/2023 1:57 PM Terrrano II Apartments - Riverside-South Coast County, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.6 Architectural Coating - 2024
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Archit. Coating 31.8981 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1808 1.2188 1.8101 2.9700e0030.0609 0.0609 0.0609 0.0609 281.4481 281.4481 0.0159 281.8443 Total 32.0788 1.2188 1.8101 2.9700e0030.0609 0.0609 0.0609 0.0609 281.4481 281.4481 0.0159 281.8443 Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0307 0.0181 0.3092 8.6000e0040.1006 4.5000e0040.1011 0.0267 4.2000e0040.0271 88.3733 88.3733 1.8700e0031.9600e00389.0047 Total 0.0307 0.0181 0.3092 8.6000e0040.1006 4.5000e0040.1011 0.0267 4.2000e0040.0271 88.3733 88.3733 1.8700e0031.9600e00389.0047 Unmitigated Construction Off-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 15 of 23 Date: 1/28/2023 1:57 PM Terrrano II Apartments - Riverside-South Coast County, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.6 Architectural Coating - 2024
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Archit. Coating 31.8981 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1808 1.2188 1.8101 2.9700e0030.0609 0.0609 0.0609 0.0609 0.0000 281.4481 281.4481 0.0159 281.8443 Total 32.0788 1.2188 1.8101 2.9700e0030.0609 0.0609 0.0609 0.0609 0.0000 281.4481 281.4481 0.0159 281.8443 Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0307 0.0181 0.3092 8.6000e0040.1006 4.5000e0040.1011 0.0267 4.2000e0040.0271 88.3733 88.3733 1.8700e0031.9600e00389.0047 Total 0.0307 0.0181 0.3092 8.6000e0040.1006 4.5000e0040.1011 0.0267 4.2000e0040.0271 88.3733 88.3733 1.8700e0031.9600e00389.0047 Mitigated Construction Off-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 16 of 23 Date: 1/28/2023 1:57 PM Terrrano II Apartments - Riverside-South Coast County, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
4.0 Operational Detail - Mobile
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Mitigated 1.0055 1.2879 9.8477 0.0231 2.4328 0.0176 2.4503 0.6490 0.0165 0.6654 2,408.423 6 2,408.423
6 0.1110 0.1069 2,443.040
8 Unmitigated 1.0055 1.2879 9.8477 0.0231 2.4328 0.0176 2.4503 0.6490 0.0165 0.6654 2,408.423 6 2,408.423
6 0.1110 0.1069 2,443.040
8 4.1 Mitigation Measures Mobile
4.2 Trip Summary Information
4.3 Trip Type Information
Average Daily Trip Rate Unmitigated Mitigated
Land Use Weekday Saturday Sunday Annual VMT Annual VMT
Apartments Low Rise 337.00 337.00 337.00 1,151,580 1,151,580 Parking Lot 0.00 0.00 0.00
Total 337.00 337.00 337.00 1,151,580 1,151,580
Miles Trip % Trip Purpose %
Land Use H-W or C-W H-S or C-C H-O or C-NW H-W or C-W H-S or C-C H-O or C-NW Primary Diverted Pass-by Apartments Low Rise 14.70 5.90 8.70 40.20 19.20 40.60 86 11 3 Parking Lot 16.60 8.40 6.90 0.00 0.00 0.00 0 0 0
4.4 Fleet Mix
CalEEMod Version: CalEEMod.2020.4.0 Page 17 of 23 Date: 1/28/2023 1:57 PM Terrrano II Apartments - Riverside-South Coast County, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied Land Use LDA LDT1 LDT2 MDV LHD1 LHD2 MHD HHD OBUS UBUS MCY SBUS MH Apartments Low Rise 0.540541 0.056458 0.173793 0.136090 0.025268 0.007074 0.011525 0.018705 0.000610 0.000304 0.023606 0.001094 0.004932 Parking Lot 0.540541 0.056458 0.173793 0.136090 0.025268 0.007074 0.011525 0.018705 0.000610 0.000304 0.023606 0.001094 0.004932
5.0 Energy Detail
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
NaturalGas
Mitigated
0.0224 0.1910 0.0813 1.2200e0030.0154 0.0154 0.0154 0.0154 243.7697 243.7697 4.6700e0034.4700e003245.2183 NaturalGas
Unmitigated
0.0224 0.1910 0.0813 1.2200e0030.0154 0.0154 0.0154 0.0154 243.7697 243.7697 4.6700e0034.4700e003245.2183
5.1 Mitigation Measures Energy
Historical Energy Use: N
CalEEMod Version: CalEEMod.2020.4.0 Page 18 of 23 Date: 1/28/2023 1:57 PM Terrrano II Apartments - Riverside-South Coast County, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
6.0 Area Detail
5.2 Energy by Land Use - NaturalGas
NaturalGa
s Use
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Land Use kBTU/yr lb/day lb/day
Apartments Low
Rise
2072.04 0.0224 0.1910 0.0813 1.2200e0030.0154 0.0154 0.0154 0.0154 243.7697 243.7697 4.6700e0034.4700e003245.2183 Parking Lot 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0224 0.1910 0.0813 1.2200e0030.0154 0.0154 0.0154 0.0154 243.7697 243.7697 4.6700e0034.4700e003245.2183 Unmitigated
NaturalGa
s Use
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Land Use kBTU/yr lb/day lb/day
Apartments Low
Rise
2.07204 0.0224 0.1910 0.0813 1.2200e0030.0154 0.0154 0.0154 0.0154 243.7697 243.7697 4.6700e0034.4700e003245.2183 Parking Lot 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0224 0.1910 0.0813 1.2200e0030.0154 0.0154 0.0154 0.0154 243.7697 243.7697 4.6700e0034.4700e003245.2183 Mitigated
CalEEMod Version: CalEEMod.2020.4.0 Page 19 of 23 Date: 1/28/2023 1:57 PM Terrrano II Apartments - Riverside-South Coast County, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
6.1 Mitigation Measures Area
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Mitigated 1.2094 0.0475 4.1268 2.2000e0040.0229 0.0229 0.0229 0.0229 0.0000 7.4397 7.4397 7.1400e0030.0000 7.6183 Unmitigated 1.2094 0.0475 4.1268 2.2000e0040.0229 0.0229 0.0229 0.0229 0.0000 7.4397 7.4397 7.1400e0030.0000 7.6183 CalEEMod Version: CalEEMod.2020.4.0 Page 20 of 23 Date: 1/28/2023 1:57 PM Terrrano II Apartments - Riverside-South Coast County, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
6.2 Area by SubCategory
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
SubCategory lb/day lb/day
Architectural
Coating
0.0874 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Consumer
Products
0.9978 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Hearth 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Landscaping 0.1243 0.0475 4.1268 2.2000e0040.0229 0.0229 0.0229 0.0229 7.4397 7.4397 7.1400e0037.6183 Total 1.2094 0.0475 4.1268 2.2000e0040.0229 0.0229 0.0229 0.0229 0.0000 7.4397 7.4397 7.1400e0030.0000 7.6183 Unmitigated
CalEEMod Version: CalEEMod.2020.4.0 Page 21 of 23 Date: 1/28/2023 1:57 PM Terrrano II Apartments - Riverside-South Coast County, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
7.1 Mitigation Measures Water
7.0 Water Detail
6.2 Area by SubCategory
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
SubCategory lb/day lb/day
Architectural
Coating
0.0874 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Consumer
Products
0.9978 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Hearth 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Landscaping 0.1243 0.0475 4.1268 2.2000e0040.0229 0.0229 0.0229 0.0229 7.4397 7.4397 7.1400e0037.6183 Total 1.2094 0.0475 4.1268 2.2000e0040.0229 0.0229 0.0229 0.0229 0.0000 7.4397 7.4397 7.1400e0030.0000 7.6183 Mitigated
CalEEMod Version: CalEEMod.2020.4.0 Page 22 of 23 Date: 1/28/2023 1:57 PM Terrrano II Apartments - Riverside-South Coast County, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
11.0 Vegetation
8.1 Mitigation Measures Waste
8.0 Waste Detail
9.0 Operational Offroad
Equipment Type Number Hours/Day Days/Year Horse Power Load Factor Fuel Type
10.0 Stationary Equipment
Fire Pumps and Emergency Generators
Equipment Type Number Hours/Day Hours/Year Horse Power Load Factor Fuel Type Boilers
Equipment Type Number Heat Input/Day Heat Input/Year Boiler Rating Fuel Type User Defined Equipment
Equipment Type Number
CalEEMod Version: CalEEMod.2020.4.0 Page 23 of 23 Date: 1/28/2023 1:57 PM Terrrano II Apartments - Riverside-South Coast County, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied Terrrano II Apartments
Riverside-South Coast County, Winter
Project Characteristics -
Land Use - 2.96 acres
Construction Phase -
Off-road Equipment -
Off-road Equipment -
Off-road Equipment -
Off-road Equipment -
Off-road Equipment -
Grading -
Vehicle Trips - per TS
Construction Off-road Equipment Mitigation -
1.1 Land Usage
Land Uses Size Metric Lot Acreage Floor Surface Area Population Apartments Low Rise 50.00 Dwelling Unit 2.47 50,000.00 143 Parking Lot 55.00 Space 0.49 22,000.00 0
1.2 Other Project Characteristics
Urbanization
Climate Zone
Urban
10 Wind Speed (m/s) 2.4 Precipitation Freq (Days) 28
1.3 User Entered Comments & Non-Default Data
1.0 Project Characteristics
Utility Company Southern California Edison
Operational Year 2025
CO2 Intensity
(lb/MWhr)
390.98 CH4 Intensity 0.033
(lb/MWhr)
N2O Intensity 0.004
(lb/MWhr)
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 23 Date: 1/28/2023 1:57 PM Terrrano II Apartments - Riverside-South Coast County, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied Woodstoves - No hearth options will be provided
2.0 Emissions Summary
Table Name Column Name Default Value New Value
tblConstructionPhase PhaseEndDate 12/12/2024 11/28/2024 tblConstructionPhase PhaseStartDate 11/29/2024 11/15/2024 tblFireplaces NumberGas 42.50 0.00
tblFireplaces NumberNoFireplace 5.00 50.00
tblFireplaces NumberWood 2.50 0.00
tblLandUse LotAcreage 3.13 2.47
tblOffRoadEquipment LoadFactor 0.38 0.38
tblOffRoadEquipment OffRoadEquipmentType Rollers
tblVehicleTrips ST_TR 8.14 6.74
tblVehicleTrips SU_TR 6.28 6.74
tblVehicleTrips WD_TR 7.32 6.74
tblWoodstoves NumberCatalytic 2.50 0.00
tblWoodstoves NumberNoncatalytic 2.50 0.00
CalEEMod Version: CalEEMod.2020.4.0 Page 2 of 23 Date: 1/28/2023 1:57 PM Terrrano II Apartments - Riverside-South Coast County, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
2.1 Overall Construction (Maximum Daily Emission)
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Year lb/day lb/day
2024 32.9078 13.2292 15.4797 0.0305 0.6420 0.5429 1.1035 0.1500 0.5198 0.6698 0.0000 2,854.683 8 2,854.683
8 0.4590 0.0343 2,875.855
0 Maximum 32.9078 13.2292 15.4797 0.0305 0.6420 0.5429 1.1035 0.1500 0.5198 0.6698 0.0000 2,854.683 8 2,854.683
8 0.4590 0.0343 2,875.855
0 Unmitigated Construction
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Year lb/day lb/day
2024 32.9078 13.2292 15.4797 0.0305 0.5606 0.5429 1.1035 0.1500 0.5198 0.6698 0.0000 2,854.683 8 2,854.683
8 0.4590 0.0343 2,875.855
0 Maximum 32.9078 13.2292 15.4797 0.0305 0.5606 0.5429 1.1035 0.1500 0.5198 0.6698 0.0000 2,854.683 8 2,854.683
8 0.4590 0.0343 2,875.855
0 Mitigated Construction
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e
Percent
Reduction
0.00 0.00 0.00 0.00 12.68 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 CalEEMod Version: CalEEMod.2020.4.0 Page 3 of 23 Date: 1/28/2023 1:57 PM Terrrano II Apartments - Riverside-South Coast County, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
2.2 Overall Operational
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Area 1.2094 0.0475 4.1268 2.2000e0040.0229 0.0229 0.0229 0.0229 0.0000 7.4397 7.4397 7.1400e0030.0000 7.6183 Energy 0.0224 0.1910 0.0813 1.2200e0030.0154 0.0154 0.0154 0.0154 243.7697 243.7697 4.6700e0034.4700e003245.2183 Mobile 0.8562 1.3671 8.7151 0.0214 2.4328 0.0176 2.4504 0.6490 0.0165 0.6654 2,236.421 4 2,236.421
4 0.1134 0.1091 2,271.763
2 Total 2.0880 1.6056 12.9231 0.0229 2.4328 0.0559 2.4887 0.6490 0.0548 0.7038 0.0000 2,487.630 8 2,487.630
8 0.1252 0.1136 2,524.599
7 Unmitigated Operational
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Area 1.2094 0.0475 4.1268 2.2000e0040.0229 0.0229 0.0229 0.0229 0.0000 7.4397 7.4397 7.1400e0030.0000 7.6183 Energy 0.0224 0.1910 0.0813 1.2200e0030.0154 0.0154 0.0154 0.0154 243.7697 243.7697 4.6700e0034.4700e003245.2183 Mobile 0.8562 1.3671 8.7151 0.0214 2.4328 0.0176 2.4504 0.6490 0.0165 0.6654 2,236.421 4 2,236.421
4 0.1134 0.1091 2,271.763
2 Total 2.0880 1.6056 12.9231 0.0229 2.4328 0.0559 2.4887 0.6490 0.0548 0.7038 0.0000 2,487.630 8 2,487.630
8 0.1252 0.1136 2,524.599
7 Mitigated Operational
CalEEMod Version: CalEEMod.2020.4.0 Page 4 of 23 Date: 1/28/2023 1:57 PM Terrrano II Apartments - Riverside-South Coast County, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.0 Construction Detail
Construction Phase
Phase
Number
Phase Name Phase Type Start Date End Date Num Days
Week
Num Days Phase Description
1 Site Preparation Site Preparation 1/1/2024 1/3/2024 5 3 2 Grading Grading 1/4/2024 1/11/2024 5 6
3 Building Construction Building Construction 1/12/2024 11/14/2024 5 220 4 Paving Paving 11/15/2024 11/28/2024 5 10
5 Architectural Coating Architectural Coating 11/15/2024 11/28/2024 5 10 OffRoad Equipment
Phase Name Offroad Equipment Type Amount Usage Hours Horse Power Load Factor Architectural Coating Air Compressors 1 6.00 78 0.48
Grading Rollers 1 7.00 80 0.38
Building Construction Cranes 1 8.00 231 0.29
Building Construction Forklifts 2 7.00 89 0.20
Building Construction Generator Sets 1 8.00 84 0.74
Grading Graders 1 8.00 187 0.41
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e
Percent
Reduction
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Residential Indoor: 101,250; Residential Outdoor: 33,750; Non-Residential Indoor: 0; Non-Residential Outdoor: 0; Striped Parking Area: 1,320 (Architectural Coating – sqft)
Acres of Grading (Site Preparation Phase): 1.5
Acres of Grading (Grading Phase): 3
Acres of Paving: 0.49
CalEEMod Version: CalEEMod.2020.4.0 Page 5 of 23 Date: 1/28/2023 1:57 PM Terrrano II Apartments - Riverside-South Coast County, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.1 Mitigation Measures Construction
Water Exposed Area
Site Preparation Graders 1 8.00 187 0.41
Paving Pavers 1 8.00 130 0.42
Paving Paving Equipment 1 8.00 132 0.36
Paving Rollers 2 8.00 80 0.38
Building Construction Tractors/Loaders/Backhoes 1 6.00 97 0.37 Grading Tractors/Loaders/Backhoes 2 7.00 97 0.37
Site Preparation Tractors/Loaders/Backhoes 1 7.00 97 0.37 Building Construction Welders 3 8.00 46 0.45
Trips and VMT
Phase Name Offroad Equipment
Count
Worker Trip
Number
Vendor Trip
Number
Hauling Trip
Number
Worker Trip
Length
Vendor Trip
Length
Hauling Trip
Length
Worker Vehicle
Class
Vendor
Vehicle Class
Hauling
Vehicle Class
Architectural Coating 1 9.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT Building Construction 8 45.00 9.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT Grading 4 10.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT Paving 4 10.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT Site Preparation 2 5.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT CalEEMod Version: CalEEMod.2020.4.0 Page 6 of 23 Date: 1/28/2023 1:57 PM Terrrano II Apartments - Riverside-South Coast County, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.2 Site Preparation - 2024
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Fugitive Dust 0.5303 0.0000 0.5303 0.0573 0.0000 0.0573 0.0000 0.0000 Off-Road 0.4805 5.4229 3.6126 9.3400e0030.1929 0.1929 0.1775 0.1775 904.5534 904.5534 0.2926 911.8671 Total 0.4805 5.4229 3.6126 9.3400e0030.5303 0.1929 0.7232 0.0573 0.1775 0.2347 904.5534 904.5534 0.2926 911.8671 Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0160 0.0104 0.1395 4.3000e0040.0559 2.5000e0040.0561 0.0148 2.3000e0040.0151 44.4939 44.4939 1.0400e0031.1200e00344.8522 Total 0.0160 0.0104 0.1395 4.3000e0040.0559 2.5000e0040.0561 0.0148 2.3000e0040.0151 44.4939 44.4939 1.0400e0031.1200e00344.8522 Unmitigated Construction Off-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 7 of 23 Date: 1/28/2023 1:57 PM Terrrano II Apartments - Riverside-South Coast County, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.2 Site Preparation - 2024
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Fugitive Dust 0.2386 0.0000 0.2386 0.0258 0.0000 0.0258 0.0000 0.0000 Off-Road 0.4805 5.4229 3.6126 9.3400e0030.1929 0.1929 0.1775 0.1775 0.0000 904.5534 904.5534 0.2926 911.8671 Total 0.4805 5.4229 3.6126 9.3400e0030.2386 0.1929 0.4315 0.0258 0.1775 0.2033 0.0000 904.5534 904.5534 0.2926 911.8671 Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0160 0.0104 0.1395 4.3000e0040.0559 2.5000e0040.0561 0.0148 2.3000e0040.0151 44.4939 44.4939 1.0400e0031.1200e00344.8522 Total 0.0160 0.0104 0.1395 4.3000e0040.0559 2.5000e0040.0561 0.0148 2.3000e0040.0151 44.4939 44.4939 1.0400e0031.1200e00344.8522 Mitigated Construction Off-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 8 of 23 Date: 1/28/2023 1:57 PM Terrrano II Apartments - Riverside-South Coast County, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.3 Grading - 2024
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Fugitive Dust 0.5303 0.0000 0.5303 0.0573 0.0000 0.0573 0.0000 0.0000 Off-Road 0.7324 8.0071 7.1671 0.0143 0.3208 0.3208 0.2951 0.2951 1,388.167 8 1,388.167
8 0.4490 1,399.391
8 Total 0.7324 8.0071 7.1671 0.0143 0.5303 0.3208 0.8510 0.0573 0.2951 0.3524 1,388.167 8 1,388.167
8 0.4490 1,399.391
8 Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0320 0.0209 0.2791 8.6000e0040.1118 5.0000e0040.1123 0.0296 4.6000e0040.0301 88.9879 88.9879 2.0800e0032.2300e00389.7044 Total 0.0320 0.0209 0.2791 8.6000e0040.1118 5.0000e0040.1123 0.0296 4.6000e0040.0301 88.9879 88.9879 2.0800e0032.2300e00389.7044 Unmitigated Construction Off-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 9 of 23 Date: 1/28/2023 1:57 PM Terrrano II Apartments - Riverside-South Coast County, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.3 Grading - 2024
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Fugitive Dust 0.2386 0.0000 0.2386 0.0258 0.0000 0.0258 0.0000 0.0000 Off-Road 0.7324 8.0071 7.1671 0.0143 0.3208 0.3208 0.2951 0.2951 0.0000 1,388.167 8 1,388.167
8 0.4490 1,399.391
8 Total 0.7324 8.0071 7.1671 0.0143 0.2386 0.3208 0.5594 0.0258 0.2951 0.3209 0.0000 1,388.167 8 1,388.167
8 0.4490 1,399.391
8 Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0320 0.0209 0.2791 8.6000e0040.1118 5.0000e0040.1123 0.0296 4.6000e0040.0301 88.9879 88.9879 2.0800e0032.2300e00389.7044 Total 0.0320 0.0209 0.2791 8.6000e0040.1118 5.0000e0040.1123 0.0296 4.6000e0040.0301 88.9879 88.9879 2.0800e0032.2300e00389.7044 Mitigated Construction Off-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 10 of 23 Date: 1/28/2023 1:57 PM Terrrano II Apartments - Riverside-South Coast County, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.4 Building Construction - 2024
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 1.5971 12.8235 14.1002 0.0250 0.5381 0.5381 0.5153 0.5153 2,289.654 1 2,289.654
1 0.4265 2,300.315
4 Total 1.5971 12.8235 14.1002 0.0250 0.5381 0.5381 0.5153 0.5153 2,289.654 1 2,289.654
1 0.4265 2,300.315
4 Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 9.2400e0030.3119 0.1238 1.5500e0030.0576 2.5500e0030.0602 0.0166 2.4400e0030.0190 164.5843 164.5843 1.7300e0030.0243 171.8700 Worker 0.1441 0.0939 1.2558 3.8800e0030.5030 2.2600e0030.5053 0.1334 2.0800e0030.1355 400.4453 400.4453 9.3500e0030.0100 403.6696 Total 0.1533 0.4058 1.3796 5.4300e0030.5606 4.8100e0030.5655 0.1500 4.5200e0030.1545 565.0297 565.0297 0.0111 0.0343 575.5396 Unmitigated Construction Off-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 11 of 23 Date: 1/28/2023 1:57 PM Terrrano II Apartments - Riverside-South Coast County, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.4 Building Construction - 2024
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 1.5971 12.8235 14.1002 0.0250 0.5381 0.5381 0.5153 0.5153 0.0000 2,289.654 1 2,289.654
1 0.4265 2,300.315
4 Total 1.5971 12.8235 14.1002 0.0250 0.5381 0.5381 0.5153 0.5153 0.0000 2,289.654 1 2,289.654
1 0.4265 2,300.315
4 Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 9.2400e0030.3119 0.1238 1.5500e0030.0576 2.5500e0030.0602 0.0166 2.4400e0030.0190 164.5843 164.5843 1.7300e0030.0243 171.8700 Worker 0.1441 0.0939 1.2558 3.8800e0030.5030 2.2600e0030.5053 0.1334 2.0800e0030.1355 400.4453 400.4453 9.3500e0030.0100 403.6696 Total 0.1533 0.4058 1.3796 5.4300e0030.5606 4.8100e0030.5655 0.1500 4.5200e0030.1545 565.0297 565.0297 0.0111 0.0343 575.5396 Mitigated Construction Off-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 12 of 23 Date: 1/28/2023 1:57 PM Terrrano II Apartments - Riverside-South Coast County, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.5 Paving - 2024
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 0.6398 6.2866 9.1629 0.0140 0.3149 0.3149 0.2897 0.2897 1,357.919 3 1,357.919
3 0.4392 1,368.898
8 Paving 0.1284 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.7682 6.2866 9.1629 0.0140 0.3149 0.3149 0.2897 0.2897 1,357.919 3 1,357.919
3 0.4392 1,368.898
8 Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0320 0.0209 0.2791 8.6000e0040.1118 5.0000e0040.1123 0.0296 4.6000e0040.0301 88.9879 88.9879 2.0800e0032.2300e00389.7044 Total 0.0320 0.0209 0.2791 8.6000e0040.1118 5.0000e0040.1123 0.0296 4.6000e0040.0301 88.9879 88.9879 2.0800e0032.2300e00389.7044 Unmitigated Construction Off-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 13 of 23 Date: 1/28/2023 1:57 PM Terrrano II Apartments - Riverside-South Coast County, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.5 Paving - 2024
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 0.6398 6.2866 9.1629 0.0140 0.3149 0.3149 0.2897 0.2897 0.0000 1,357.919 3 1,357.919
3 0.4392 1,368.898
8 Paving 0.1284 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.7682 6.2866 9.1629 0.0140 0.3149 0.3149 0.2897 0.2897 0.0000 1,357.919 3 1,357.919
3 0.4392 1,368.898
8 Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0320 0.0209 0.2791 8.6000e0040.1118 5.0000e0040.1123 0.0296 4.6000e0040.0301 88.9879 88.9879 2.0800e0032.2300e00389.7044 Total 0.0320 0.0209 0.2791 8.6000e0040.1118 5.0000e0040.1123 0.0296 4.6000e0040.0301 88.9879 88.9879 2.0800e0032.2300e00389.7044 Mitigated Construction Off-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 14 of 23 Date: 1/28/2023 1:57 PM Terrrano II Apartments - Riverside-South Coast County, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.6 Architectural Coating - 2024
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Archit. Coating 31.8981 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1808 1.2188 1.8101 2.9700e0030.0609 0.0609 0.0609 0.0609 281.4481 281.4481 0.0159 281.8443 Total 32.0788 1.2188 1.8101 2.9700e0030.0609 0.0609 0.0609 0.0609 281.4481 281.4481 0.0159 281.8443 Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0288 0.0188 0.2512 7.8000e0040.1006 4.5000e0040.1011 0.0267 4.2000e0040.0271 80.0891 80.0891 1.8700e0032.0100e00380.7339 Total 0.0288 0.0188 0.2512 7.8000e0040.1006 4.5000e0040.1011 0.0267 4.2000e0040.0271 80.0891 80.0891 1.8700e0032.0100e00380.7339 Unmitigated Construction Off-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 15 of 23 Date: 1/28/2023 1:57 PM Terrrano II Apartments - Riverside-South Coast County, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.6 Architectural Coating - 2024
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Archit. Coating 31.8981 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1808 1.2188 1.8101 2.9700e0030.0609 0.0609 0.0609 0.0609 0.0000 281.4481 281.4481 0.0159 281.8443 Total 32.0788 1.2188 1.8101 2.9700e0030.0609 0.0609 0.0609 0.0609 0.0000 281.4481 281.4481 0.0159 281.8443 Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0288 0.0188 0.2512 7.8000e0040.1006 4.5000e0040.1011 0.0267 4.2000e0040.0271 80.0891 80.0891 1.8700e0032.0100e00380.7339 Total 0.0288 0.0188 0.2512 7.8000e0040.1006 4.5000e0040.1011 0.0267 4.2000e0040.0271 80.0891 80.0891 1.8700e0032.0100e00380.7339 Mitigated Construction Off-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 16 of 23 Date: 1/28/2023 1:57 PM Terrrano II Apartments - Riverside-South Coast County, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
4.0 Operational Detail - Mobile
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Mitigated 0.8562 1.3671 8.7151 0.0214 2.4328 0.0176 2.4504 0.6490 0.0165 0.6654 2,236.421 4 2,236.421
4 0.1134 0.1091 2,271.763
2 Unmitigated 0.8562 1.3671 8.7151 0.0214 2.4328 0.0176 2.4504 0.6490 0.0165 0.6654 2,236.421 4 2,236.421
4 0.1134 0.1091 2,271.763
2 4.1 Mitigation Measures Mobile
4.2 Trip Summary Information
4.3 Trip Type Information
Average Daily Trip Rate Unmitigated Mitigated
Land Use Weekday Saturday Sunday Annual VMT Annual VMT
Apartments Low Rise 337.00 337.00 337.00 1,151,580 1,151,580 Parking Lot 0.00 0.00 0.00
Total 337.00 337.00 337.00 1,151,580 1,151,580
Miles Trip % Trip Purpose %
Land Use H-W or C-W H-S or C-C H-O or C-NW H-W or C-W H-S or C-C H-O or C-NW Primary Diverted Pass-by Apartments Low Rise 14.70 5.90 8.70 40.20 19.20 40.60 86 11 3 Parking Lot 16.60 8.40 6.90 0.00 0.00 0.00 0 0 0
4.4 Fleet Mix
CalEEMod Version: CalEEMod.2020.4.0 Page 17 of 23 Date: 1/28/2023 1:57 PM Terrrano II Apartments - Riverside-South Coast County, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied Land Use LDA LDT1 LDT2 MDV LHD1 LHD2 MHD HHD OBUS UBUS MCY SBUS MH Apartments Low Rise 0.540541 0.056458 0.173793 0.136090 0.025268 0.007074 0.011525 0.018705 0.000610 0.000304 0.023606 0.001094 0.004932 Parking Lot 0.540541 0.056458 0.173793 0.136090 0.025268 0.007074 0.011525 0.018705 0.000610 0.000304 0.023606 0.001094 0.004932
5.0 Energy Detail
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
NaturalGas
Mitigated
0.0224 0.1910 0.0813 1.2200e0030.0154 0.0154 0.0154 0.0154 243.7697 243.7697 4.6700e0034.4700e003245.2183 NaturalGas
Unmitigated
0.0224 0.1910 0.0813 1.2200e0030.0154 0.0154 0.0154 0.0154 243.7697 243.7697 4.6700e0034.4700e003245.2183
5.1 Mitigation Measures Energy
Historical Energy Use: N
CalEEMod Version: CalEEMod.2020.4.0 Page 18 of 23 Date: 1/28/2023 1:57 PM Terrrano II Apartments - Riverside-South Coast County, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
6.0 Area Detail
5.2 Energy by Land Use - NaturalGas
NaturalGa
s Use
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Land Use kBTU/yr lb/day lb/day
Apartments Low
Rise
2072.04 0.0224 0.1910 0.0813 1.2200e0030.0154 0.0154 0.0154 0.0154 243.7697 243.7697 4.6700e0034.4700e003245.2183 Parking Lot 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0224 0.1910 0.0813 1.2200e0030.0154 0.0154 0.0154 0.0154 243.7697 243.7697 4.6700e0034.4700e003245.2183 Unmitigated
NaturalGa
s Use
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Land Use kBTU/yr lb/day lb/day
Apartments Low
Rise
2.07204 0.0224 0.1910 0.0813 1.2200e0030.0154 0.0154 0.0154 0.0154 243.7697 243.7697 4.6700e0034.4700e003245.2183 Parking Lot 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0224 0.1910 0.0813 1.2200e0030.0154 0.0154 0.0154 0.0154 243.7697 243.7697 4.6700e0034.4700e003245.2183 Mitigated
CalEEMod Version: CalEEMod.2020.4.0 Page 19 of 23 Date: 1/28/2023 1:57 PM Terrrano II Apartments - Riverside-South Coast County, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
6.1 Mitigation Measures Area
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Mitigated 1.2094 0.0475 4.1268 2.2000e0040.0229 0.0229 0.0229 0.0229 0.0000 7.4397 7.4397 7.1400e0030.0000 7.6183 Unmitigated 1.2094 0.0475 4.1268 2.2000e0040.0229 0.0229 0.0229 0.0229 0.0000 7.4397 7.4397 7.1400e0030.0000 7.6183 CalEEMod Version: CalEEMod.2020.4.0 Page 20 of 23 Date: 1/28/2023 1:57 PM Terrrano II Apartments - Riverside-South Coast County, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
6.2 Area by SubCategory
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
SubCategory lb/day lb/day
Architectural
Coating
0.0874 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Consumer
Products
0.9978 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Hearth 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Landscaping 0.1243 0.0475 4.1268 2.2000e0040.0229 0.0229 0.0229 0.0229 7.4397 7.4397 7.1400e0037.6183 Total 1.2094 0.0475 4.1268 2.2000e0040.0229 0.0229 0.0229 0.0229 0.0000 7.4397 7.4397 7.1400e0030.0000 7.6183 Unmitigated
CalEEMod Version: CalEEMod.2020.4.0 Page 21 of 23 Date: 1/28/2023 1:57 PM Terrrano II Apartments - Riverside-South Coast County, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
7.1 Mitigation Measures Water
7.0 Water Detail
6.2 Area by SubCategory
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
SubCategory lb/day lb/day
Architectural
Coating
0.0874 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Consumer
Products
0.9978 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Hearth 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Landscaping 0.1243 0.0475 4.1268 2.2000e0040.0229 0.0229 0.0229 0.0229 7.4397 7.4397 7.1400e0037.6183 Total 1.2094 0.0475 4.1268 2.2000e0040.0229 0.0229 0.0229 0.0229 0.0000 7.4397 7.4397 7.1400e0030.0000 7.6183 Mitigated
CalEEMod Version: CalEEMod.2020.4.0 Page 22 of 23 Date: 1/28/2023 1:57 PM Terrrano II Apartments - Riverside-South Coast County, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
11.0 Vegetation
8.1 Mitigation Measures Waste
8.0 Waste Detail
9.0 Operational Offroad
Equipment Type Number Hours/Day Days/Year Horse Power Load Factor Fuel Type
10.0 Stationary Equipment
Fire Pumps and Emergency Generators
Equipment Type Number Hours/Day Hours/Year Horse Power Load Factor Fuel Type Boilers
Equipment Type Number Heat Input/Day Heat Input/Year Boiler Rating Fuel Type User Defined Equipment
Equipment Type Number
CalEEMod Version: CalEEMod.2020.4.0 Page 23 of 23 Date: 1/28/2023 1:57 PM Terrrano II Apartments - Riverside-South Coast County, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied 42428 Chisolm Trail, Murrieta CA 92562 phone 760-473-1253 www.ldnconsulting.net fax 760-689-4943
1/31/2023 22-161 Terrano II GHG 1
January 31, 2023
Matt McKinlay
Rexco Development
1285 Corona Pointe Court Suite 102
Corona, CA 92879
RE: Terrano II Multi-Family Development at Dos Lagos GHG Letter – City of Corona Planning Area 1 of the Dos Lagos Specific Plan was entitled in 2018 and included a 276-unit apartment complex, a 107 room hotel, 6,100 square-feet (SF) of commercial uses, 10,300 SF of restaurant uses (4,000 SF quality restaurant use and 6,300 SF high-turnover sit-down restaurant use), and a 20-fueling position gas station with convenience store and car wash, of which the apartment complex, hotel, and gas station are completed and opened.
The entitled 6,100 SF of commercial uses and the 10,300 SF of restaurant uses have not been constructed and a 2.96 acre undeveloped parcel remains within Planning Area 1. The proposed Project seeks to modify Planning Area 1 of the Dos Lagos Specific Plan and construct a 50-unit multi-family apartment development.
The purpose of this Greenhouse Gas (GHG) letter is to analyze the Project’s GHG emissions and evaluate its conformance with the City of Corona’s Climate Action Plan (CAP). As described in the City’s CAP, there is an existing framework of federal, State, regional, and local policies and regulations that identify GHG reduction requirements within the State. The CAP provides a plan for the City to meet these requirements and achieve local reduction requirements outlined in the CAP (City of Corona, 2019). In addition, showing consistency with the CAP would also demonstrate that the proposed Project would have a less than significant impact under the California Environmental Quality Act (CEQA).
The City of Corona guidelines for determining significance for GHGs under CEQA are identified in the CEQA Thresholds and Screening Tables prepared for the City of Corona by LSA in 2019.
Under this methodology, projects could demonstrate compliance with the City’s Climate Action Plan (CAP) by indicating how the project would achieve 100 points based on the City’s screening checklist guidance. Upon achieving 100 points, the project would equally be screened out with respect to GHG and have a less than significant impact under CEQA. The City’s screening tables give initial guidance for mitigating significance though does not specifically include a numerical screening threshold (City of Corona, 2019). The intent of achieving points essentially is to Matt McKinlay
Rexco Development
1285 Corona Pointe Court Suite 102
Corona, CA 92879
42428 Chisolm Trail, Murrieta CA 92562
phone 760-473-1253
Fax 760-689-4943
1/31/2023 22-161 Terrano II GHG 2
implement project features to reduce energy consumption or improve the building’s envelope to reduce energy losses.
Since the overall goal of the City’s CAP is to reduce GHG emissions within the City of Corona, reducing GHG intensity from an approved land use would also ensure the City’s GHG inventories are reduced. This letter compares GHG emissions which could be expected should buildout of the remaining SP land uses are constructed and operated with the proposed multi-family residential project. If the proposed Project reduces GHG emission intensity for the remaining
2.96 acre buildout area, the project would have a less than significant GHG impact under CEQA.
GHG emissions from daily operations which would include sources such as Area, Energy, Mobile, Waste and Water uses. Area Sources include usage of consumer products, landscaping and architectural coatings as part of regular maintenance. Energy sources would be from uses such as electricity and natural gas. Solid waste generated in the form of trash is also considered as decomposition of organic material breaks down to form GHGs. GHGs from water are also indirectly generated through the conveyance of the resource via pumping throughout the state and as necessary for wastewater treatment. Finally, the project would also generate air quality emissions and GHG through the use of carbon fuel burning vehicles for transportation. Traffic Generation for the 50 unit apartment project was estimated to be 337 average daily trips (ADT) (LL&G, 2023) while the entitled SP project would generate 1,075 ADT (LL&G, 2023).
GHG impacts related to construction and daily operations for both the entitled development remaining and proposed multi-family developments were calculated using the latest CalEEMod 2020.4.0 air quality and GHG model, which was developed by Breeze Software for South Coast Air Quality Management District (SCAQMD) in 2021. The City of Corona recognizes the CalEEMod Version 2020.4.0 as an acceptable model for projects of this nature. Construction emissions for the site would essential be the same though minimal insignificant variation of GHG Emissions is expected. Given this, only yearly operational emissions are quantified in this analysis and presented for comparison. These models are provided as Attachments A and -B to this letter.
Entitled Commercial and Restaurant Operational Emissions As previously discussed, the remainder development at Dos Lagos Planning Area 1 allows for the construction of 6,100 square-feet (SF) of commercial uses and 10,300 SF of restaurant uses (4,000 SF quality restaurant use and 6,300 SF high-turnover sit-down restaurant use). GHG emissions generated from this land use scenario are shown in Table 1 below and include emissions from default Area, Energy, Solid Waste and Water sources. Mobile emissions were manually updated utilizing scenario based ADT provided by the Project Traffic Engineer (LL&G, 2023). The CalEEMod output for this scenario is provided as Attachment A to this letter.
Matt McKinlay
Rexco Development
1285 Corona Pointe Court Suite 102
Corona, CA 92879
42428 Chisolm Trail, Murrieta CA 92562
phone 760-473-1253
Fax 760-689-4943
1/31/2023 22-161 Terrano II GHG 3
Table 1: Expected Operational Emissions Summary -Entitled Project - MT/Year Year Bio-CO2 NBio-CO2 Total CO2 CH4 N2O CO2e
Area 0.00 0.00 0.00 0.00 0.00 0.00
Energy 0.00 245.24 245.24 0.01 0.00 246.63
Mobile 0.00 736.78 736.78 0.04 0.04 749.54
Waste 17.11 0.00 17.11 1.01 0.00 42.39
Water 1.34 11.43 12.76 0.14 0.00 17.22
Total Operations 18.45 993.45 1,011.89 1.20 0.04 1,055.78 Expected Construction emissions are based upon CalEEMod 2020.4.0 modeling assumptions for equipment and durations listed in Table 1 above.
CalEEMod annual output is attached to this letter.
Data is presented in decimal format and may have rounding errors.
Proposed 50-Unit Multi-Family Apartments Operational Emissions The Proposed project seeks to modify Dos Lagos Planning Area 1 and instead construct a 50- unit multi-family apartment complex. GHG emissions generated from this land use scenario are shown in Table 2 below and include emissions from default Area, Energy, Solid Waste and Water sources. Mobile emissions were manually updated utilizing scenario-based ADT provided by the Project Traffic Engineer (LL&G, 2023). The CalEEMod output for this scenario is Provided as Attachment B to this letter.
Table 2: Expected Operational Emissions Summary – Proposed Project - MT/Year Year Bio-CO2 NBio-CO2 Total CO2 CH4 N2O CO2e
Area 0.00 0.84 0.84 0.00 0.00 0.86
Energy 0.00 78.70 78.70 0.00 0.00 79.14
Mobile 0.00 375.11 375.11 0.02 0.02 380.97
Waste 4.67 0.00 4.67 0.28 0.00 11.57
Water 1.03 11.57 12.60 0.11 0.00 16.06
Total Operations 5.70 466.22 471.92 0.41 0.02 488.60
Expected Construction emissions are based upon CalEEMod 2020.4.0 modeling assumptions for equipment and durations listed in Table 1 above.
CalEEMod annual output is attached to this letter.
Data is presented in decimal format and may have rounding errors.
Matt McKinlay
Rexco Development
1285 Corona Pointe Court Suite 102
Corona, CA 92879
42428 Chisolm Trail, Murrieta CA 92562
phone 760-473-1253
Fax 760-689-4943
1/31/2023 22-161 Terrano II GHG 4
Based upon the operations emissions modeling as calculated by CalEEMod, the proposed project would generally reduce GHG emissions by 53.7% compared to what would have been otherwise assumed for the 2.96 acre development site. This is largely due to the fact that the commercial and restaurant uses entitled would have a higher energy demand and would generate more traffic as identified by the Project Traffic Engineer. Since the Project would reduce GHG emissions by over half, the proposed Project action would have a less than significant impact on Climate Change and would be consistent with the goals and intent to reduce the City’s GHG emissions spelled out in the City’s CAP. Based on this, the project would not be required to implement GHG design features beyond those required by local state and City regulations.
Therefore, the project would be considered less than significant for GHG emissions.
If you have any questions, please do not hesitate to contact me directly at (760) 473-1253.
Sincerely,
Ldn Consulting, Inc.
Jeremy Louden
Attachment A: CalEEMod Model Results (Entitled Commercial and Restaurant Uses) Attachment B: CalEEMod Model Results (Proposed Project) References:
City of Corona. (2019). City of Corona - Climate Action Plan Update. Corona. Retrieved from https://www.coronaca.gov/home/showpublisheddocument?id=18422 LL&G. (2023). Traffic Circuation Assessment for the Proposed Terrano II Apartments at Dos Lagos.
Planning Area 1 Commercial and Restaurant SP Scenario
Riverside-South Coast County, Annual
Project Characteristics -
Land Use - 2.96 Acres
Construction Phase -
Off-road Equipment -
Off-road Equipment -
Off-road Equipment -
Off-road Equipment -
Off-road Equipment -
Grading -
Vehicle Trips - Trip Generation is 65.54 per 1000 sf per Traffic Study... 16.4 KSF yields 1,075 trips
1.1 Land Usage
Land Uses Size Metric Lot Acreage Floor Surface Area Population General Office Building 6.10 1000sqft 1.00 6,100.00 0
Quality Restaurant 4.00 1000sqft 0.96 4,000.00 0
High Turnover (Sit Down Restaurant) 6.30 1000sqft 1.00 6,300.00 0
1.2 Other Project Characteristics
Urbanization
Climate Zone
Urban
10 Wind Speed (m/s) 2.4 Precipitation Freq (Days) 28
1.3 User Entered Comments & Non-Default Data
1.0 Project Characteristics
Utility Company Southern California Edison
Operational Year 2025
CO2 Intensity
(lb/MWhr)
390.98 CH4 Intensity 0.033
(lb/MWhr)
N2O Intensity 0.004
(lb/MWhr)
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 30 Date: 1/28/2023 8:23 PM Planning Area 1 Commercial and Restaurant SP Scenario - Riverside-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
2.0 Emissions Summary
Table Name Column Name Default Value New Value
tblConstructionPhase PhaseEndDate 12/12/2024 11/28/2024 tblConstructionPhase PhaseStartDate 11/29/2024 11/15/2024 tblLandUse LotAcreage 0.14 1.00
tblLandUse LotAcreage 0.09 0.96
tblLandUse LotAcreage 0.14 1.00
tblVehicleTrips ST_TR 2.21 65.54
tblVehicleTrips ST_TR 122.40 65.54
tblVehicleTrips ST_TR 90.04 65.54
tblVehicleTrips SU_TR 0.70 65.54
tblVehicleTrips SU_TR 142.64 65.54
tblVehicleTrips SU_TR 71.97 65.54
tblVehicleTrips WD_TR 9.74 65.54
tblVehicleTrips WD_TR 112.18 65.54
tblVehicleTrips WD_TR 83.84 65.54
CalEEMod Version: CalEEMod.2020.4.0 Page 2 of 30 Date: 1/28/2023 8:23 PM Planning Area 1 Commercial and Restaurant SP Scenario - Riverside-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
2.1 Overall Construction
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Year tons/yr MT/yr
2024 0.2631 1.5106 1.6640 3.0400e0030.0324 0.0632 0.0956 0.0132 0.0604 0.0736 0.0000 254.2661 254.2661 0.0470 9.6000e004255.7272 Maximum 0.2631 1.5106 1.6640 3.0400e0030.0324 0.0632 0.0956 0.0132 0.0604 0.0736 0.0000 254.2661 254.2661 0.0470 9.6000e004255.7272 Unmitigated Construction
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Year tons/yr MT/yr
2024 0.2631 1.5106 1.6640 3.0400e0030.0324 0.0632 0.0956 0.0132 0.0604 0.0736 0.0000 254.2658 254.2658 0.0470 9.6000e004255.7269 Maximum 0.2631 1.5106 1.6640 3.0400e0030.0324 0.0632 0.0956 0.0132 0.0604 0.0736 0.0000 254.2658 254.2658 0.0470 9.6000e004255.7269 Mitigated Construction
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e
Percent
Reduction
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 CalEEMod Version: CalEEMod.2020.4.0 Page 3 of 30 Date: 1/28/2023 8:23 PM Planning Area 1 Commercial and Restaurant SP Scenario - Riverside-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied Quarter Start Date End Date Maximum Unmitigated ROG + NOX (tons/quarter) Maximum Mitigated ROG + NOX (tons/quarter) 1 1-1-2024 3-31-2024 0.4657 0.4657
2 4-1-2024 6-30-2024 0.4730 0.4730
3 7-1-2024 9-30-2024 0.4782 0.4782
Highest 0.4782 0.4782
2.2 Overall Operational
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Area 0.0669 0.0000 2.1000e0040.0000 0.0000 0.0000 0.0000 0.0000 0.0000 4.1000e0044.1000e0040.0000 0.0000 4.3000e004 Energy 0.0153 0.1387 0.1165 8.3000e0040.0105 0.0105 0.0105 0.0105 0.0000 245.2437 245.2437 0.0109 3.7300e003246.6272 Mobile 0.4071 0.5484 3.5590 7.7800e0030.8409 6.4500e0030.8474 0.2246 6.0400e0030.2307 0.0000 736.7786 736.7786 0.0436 0.0392 749.5443 Waste 0.0000 0.0000 0.0000 0.0000 17.1101 0.0000 17.1101 1.0112 0.0000 42.3896 Water 0.0000 0.0000 0.0000 0.0000 1.3358 11.4256 12.7614 0.1382 3.3600e00317.2158 Total 0.4892 0.6870 3.6757 8.6100e0030.8409 0.0170 0.8579 0.2246 0.0166 0.2412 18.4459 993.4483 1,011.894 2 1.2038 0.0463 1,055.777
3 Unmitigated Operational
CalEEMod Version: CalEEMod.2020.4.0 Page 4 of 30 Date: 1/28/2023 8:23 PM Planning Area 1 Commercial and Restaurant SP Scenario - Riverside-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
2.2 Overall Operational
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Area 0.0669 0.0000 2.1000e0040.0000 0.0000 0.0000 0.0000 0.0000 0.0000 4.1000e0044.1000e0040.0000 0.0000 4.3000e004 Energy 0.0153 0.1387 0.1165 8.3000e0040.0105 0.0105 0.0105 0.0105 0.0000 245.2437 245.2437 0.0109 3.7300e003246.6272 Mobile 0.4071 0.5484 3.5590 7.7800e0030.8409 6.4500e0030.8474 0.2246 6.0400e0030.2307 0.0000 736.7786 736.7786 0.0436 0.0392 749.5443 Waste 0.0000 0.0000 0.0000 0.0000 17.1101 0.0000 17.1101 1.0112 0.0000 42.3896 Water 0.0000 0.0000 0.0000 0.0000 1.3358 11.4256 12.7614 0.1382 3.3600e00317.2158 Total 0.4892 0.6870 3.6757 8.6100e0030.8409 0.0170 0.8579 0.2246 0.0166 0.2412 18.4459 993.4483 1,011.894 2 1.2038 0.0463 1,055.777
3 Mitigated Operational
3.0 Construction Detail
Construction Phase
Phase
Number
Phase Name Phase Type Start Date End Date Num Days
Week
Num Days Phase Description
1 Site Preparation Site Preparation 1/1/2024 1/3/2024 5 3 2 Grading Grading 1/4/2024 1/11/2024 5 6
3 Building Construction Building Construction 1/12/2024 11/14/2024 5 220 ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e
Percent
Reduction
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 CalEEMod Version: CalEEMod.2020.4.0 Page 5 of 30 Date: 1/28/2023 8:23 PM Planning Area 1 Commercial and Restaurant SP Scenario - Riverside-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied 4 Paving Paving 11/15/2024 11/28/2024 5 10
5 Architectural Coating Architectural Coating 11/15/2024 11/28/2024 5 10 OffRoad Equipment
Phase Name Offroad Equipment Type Amount Usage Hours Horse Power Load Factor Architectural Coating Air Compressors 1 6.00 78 0.48
Building Construction Cranes 1 8.00 231 0.29
Building Construction Forklifts 2 7.00 89 0.20
Building Construction Generator Sets 1 8.00 84 0.74
Grading Graders 1 8.00 187 0.41
Site Preparation Graders 1 8.00 187 0.41
Paving Pavers 1 8.00 130 0.42
Paving Paving Equipment 1 8.00 132 0.36
Paving Rollers 2 8.00 80 0.38
Grading Rubber Tired Dozers 1 8.00 247 0.40
Building Construction Tractors/Loaders/Backhoes 1 6.00 97 0.37 Grading Tractors/Loaders/Backhoes 2 7.00 97 0.37
Site Preparation Tractors/Loaders/Backhoes 1 7.00 97 0.37 Building Construction Welders 3 8.00 46 0.45
Trips and VMT
Residential Indoor: 0; Residential Outdoor: 0; Non-Residential Indoor: 24,600; Non-Residential Outdoor: 8,200; Striped Parking Area: 0 (Architectural Coating – sqft)
Acres of Grading (Site Preparation Phase): 1.5
Acres of Grading (Grading Phase): 6
Acres of Paving: 0
CalEEMod Version: CalEEMod.2020.4.0 Page 6 of 30 Date: 1/28/2023 8:23 PM Planning Area 1 Commercial and Restaurant SP Scenario - Riverside-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.2 Site Preparation - 2024
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Fugitive Dust 8.0000e0040.0000 8.0000e0049.0000e0050.0000 9.0000e0050.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 7.2000e0048.1300e0035.4200e0031.0000e0052.9000e0042.9000e0042.7000e0042.7000e0040.0000 1.2309 1.2309 4.0000e0040.0000 1.2409 Total 7.2000e0048.1300e0035.4200e0031.0000e0058.0000e0042.9000e0041.0900e0039.0000e0052.7000e0043.6000e0040.0000 1.2309 1.2309 4.0000e0040.0000 1.2409 Unmitigated Construction On-Site
3.1 Mitigation Measures Construction
Phase Name Offroad Equipment
Count
Worker Trip
Number
Vendor Trip
Number
Hauling Trip
Number
Worker Trip
Length
Vendor Trip
Length
Hauling Trip
Length
Worker Vehicle
Class
Vendor
Vehicle Class
Hauling
Vehicle Class
Architectural Coating 1 1.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT Building Construction 8 6.00 3.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT Grading 4 10.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT Paving 4 10.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT Site Preparation 2 5.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT CalEEMod Version: CalEEMod.2020.4.0 Page 7 of 30 Date: 1/28/2023 8:23 PM Planning Area 1 Commercial and Restaurant SP Scenario - Riverside-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.2 Site Preparation - 2024
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 2.0000e0052.0000e0052.2000e0040.0000 8.0000e0050.0000 8.0000e0052.0000e0050.0000 2.0000e0050.0000 0.0620 0.0620 0.0000 0.0000 0.0625 Total 2.0000e0052.0000e0052.2000e0040.0000 8.0000e0050.0000 8.0000e0052.0000e0050.0000 2.0000e0050.0000 0.0620 0.0620 0.0000 0.0000 0.0625 Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Fugitive Dust 8.0000e0040.0000 8.0000e0049.0000e0050.0000 9.0000e0050.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 7.2000e0048.1300e0035.4200e0031.0000e0052.9000e0042.9000e0042.7000e0042.7000e0040.0000 1.2309 1.2309 4.0000e0040.0000 1.2409 Total 7.2000e0048.1300e0035.4200e0031.0000e0058.0000e0042.9000e0041.0900e0039.0000e0052.7000e0043.6000e0040.0000 1.2309 1.2309 4.0000e0040.0000 1.2409 Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 8 of 30 Date: 1/28/2023 8:23 PM Planning Area 1 Commercial and Restaurant SP Scenario - Riverside-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.2 Site Preparation - 2024
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 2.0000e0052.0000e0052.2000e0040.0000 8.0000e0050.0000 8.0000e0052.0000e0050.0000 2.0000e0050.0000 0.0620 0.0620 0.0000 0.0000 0.0625 Total 2.0000e0052.0000e0052.2000e0040.0000 8.0000e0050.0000 8.0000e0052.0000e0050.0000 2.0000e0050.0000 0.0620 0.0620 0.0000 0.0000 0.0625 Mitigated Construction Off-Site
3.3 Grading - 2024
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Fugitive Dust 0.0213 0.0000 0.0213 0.0103 0.0000 0.0103 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 3.9000e0030.0415 0.0261 6.0000e0051.7200e0031.7200e0031.5800e0031.5800e0030.0000 5.4311 5.4311 1.7600e0030.0000 5.4750 Total 3.9000e0030.0415 0.0261 6.0000e0050.0213 1.7200e0030.0230 0.0103 1.5800e0030.0119 0.0000 5.4311 5.4311 1.7600e0030.0000 5.4750 Unmitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 9 of 30 Date: 1/28/2023 8:23 PM Planning Area 1 Commercial and Restaurant SP Scenario - Riverside-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.3 Grading - 2024
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 9.0000e0056.0000e0058.8000e0040.0000 3.3000e0040.0000 3.3000e0049.0000e0050.0000 9.0000e0050.0000 0.2478 0.2478 1.0000e0051.0000e0050.2498 Total 9.0000e0056.0000e0058.8000e0040.0000 3.3000e0040.0000 3.3000e0049.0000e0050.0000 9.0000e0050.0000 0.2478 0.2478 1.0000e0051.0000e0050.2498 Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Fugitive Dust 0.0213 0.0000 0.0213 0.0103 0.0000 0.0103 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 3.9000e0030.0415 0.0261 6.0000e0051.7200e0031.7200e0031.5800e0031.5800e0030.0000 5.4311 5.4311 1.7600e0030.0000 5.4750 Total 3.9000e0030.0415 0.0261 6.0000e0050.0213 1.7200e0030.0230 0.0103 1.5800e0030.0119 0.0000 5.4311 5.4311 1.7600e0030.0000 5.4750 Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 10 of 30 Date: 1/28/2023 8:23 PM Planning Area 1 Commercial and Restaurant SP Scenario - Riverside-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.3 Grading - 2024
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 9.0000e0056.0000e0058.8000e0040.0000 3.3000e0040.0000 3.3000e0049.0000e0050.0000 9.0000e0050.0000 0.2478 0.2478 1.0000e0051.0000e0050.2498 Total 9.0000e0056.0000e0058.8000e0040.0000 3.3000e0040.0000 3.3000e0049.0000e0050.0000 9.0000e0050.0000 0.2478 0.2478 1.0000e0051.0000e0050.2498 Mitigated Construction Off-Site
3.4 Building Construction - 2024
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Off-Road 0.1757 1.4106 1.5510 2.7500e0030.0592 0.0592 0.0567 0.0567 0.0000 228.4853 228.4853 0.0426 0.0000 229.5492 Total 0.1757 1.4106 1.5510 2.7500e0030.0592 0.0592 0.0567 0.0567 0.0000 228.4853 228.4853 0.0426 0.0000 229.5492 Unmitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 11 of 30 Date: 1/28/2023 8:23 PM Planning Area 1 Commercial and Restaurant SP Scenario - Riverside-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.4 Building Construction - 2024
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 3.5000e0040.0113 4.4600e0036.0000e0052.0800e0039.0000e0052.1800e0036.0000e0049.0000e0056.9000e0040.0000 5.4667 5.4667 6.0000e0058.1000e0045.7087 Worker 2.0000e0031.4100e0030.0194 6.0000e0057.2500e0033.0000e0057.2900e0031.9300e0033.0000e0051.9600e0030.0000 5.4520 5.4520 1.2000e0041.4000e0045.4956 Total 2.3500e0030.0127 0.0239 1.2000e0049.3300e0031.2000e0049.4700e0032.5300e0031.2000e0042.6500e0030.0000 10.9187 10.9187 1.8000e0049.5000e00411.2043 Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Off-Road 0.1757 1.4106 1.5510 2.7500e0030.0592 0.0592 0.0567 0.0567 0.0000 228.4851 228.4851 0.0426 0.0000 229.5489 Total 0.1757 1.4106 1.5510 2.7500e0030.0592 0.0592 0.0567 0.0567 0.0000 228.4851 228.4851 0.0426 0.0000 229.5489 Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 12 of 30 Date: 1/28/2023 8:23 PM Planning Area 1 Commercial and Restaurant SP Scenario - Riverside-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.4 Building Construction - 2024
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 3.5000e0040.0113 4.4600e0036.0000e0052.0800e0039.0000e0052.1800e0036.0000e0049.0000e0056.9000e0040.0000 5.4667 5.4667 6.0000e0058.1000e0045.7087 Worker 2.0000e0031.4100e0030.0194 6.0000e0057.2500e0033.0000e0057.2900e0031.9300e0033.0000e0051.9600e0030.0000 5.4520 5.4520 1.2000e0041.4000e0045.4956 Total 2.3500e0030.0127 0.0239 1.2000e0049.3300e0031.2000e0049.4700e0032.5300e0031.2000e0042.6500e0030.0000 10.9187 10.9187 1.8000e0049.5000e00411.2043 Mitigated Construction Off-Site
3.5 Paving - 2024
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Off-Road 3.2000e0030.0314 0.0458 7.0000e0051.5700e0031.5700e0031.4500e0031.4500e0030.0000 6.1594 6.1594 1.9900e0030.0000 6.2092 Paving 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 3.2000e0030.0314 0.0458 7.0000e0051.5700e0031.5700e0031.4500e0031.4500e0030.0000 6.1594 6.1594 1.9900e0030.0000 6.2092 Unmitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 13 of 30 Date: 1/28/2023 8:23 PM Planning Area 1 Commercial and Restaurant SP Scenario - Riverside-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.5 Paving - 2024
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 1.5000e0041.1000e0041.4700e0030.0000 5.5000e0040.0000 5.5000e0041.5000e0040.0000 1.5000e0040.0000 0.4130 0.4130 1.0000e0051.0000e0050.4163 Total 1.5000e0041.1000e0041.4700e0030.0000 5.5000e0040.0000 5.5000e0041.5000e0040.0000 1.5000e0040.0000 0.4130 0.4130 1.0000e0051.0000e0050.4163 Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Off-Road 3.2000e0030.0314 0.0458 7.0000e0051.5700e0031.5700e0031.4500e0031.4500e0030.0000 6.1594 6.1594 1.9900e0030.0000 6.2092 Paving 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 3.2000e0030.0314 0.0458 7.0000e0051.5700e0031.5700e0031.4500e0031.4500e0030.0000 6.1594 6.1594 1.9900e0030.0000 6.2092 Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 14 of 30 Date: 1/28/2023 8:23 PM Planning Area 1 Commercial and Restaurant SP Scenario - Riverside-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.5 Paving - 2024
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 1.5000e0041.1000e0041.4700e0030.0000 5.5000e0040.0000 5.5000e0041.5000e0040.0000 1.5000e0040.0000 0.4130 0.4130 1.0000e0051.0000e0050.4163 Total 1.5000e0041.1000e0041.4700e0030.0000 5.5000e0040.0000 5.5000e0041.5000e0040.0000 1.5000e0040.0000 0.4130 0.4130 1.0000e0051.0000e0050.4163 Mitigated Construction Off-Site
3.6 Architectural Coating - 2024
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Archit. Coating 0.0760 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 9.0000e0046.0900e0039.0500e0031.0000e0053.0000e0043.0000e0043.0000e0043.0000e0040.0000 1.2766 1.2766 7.0000e0050.0000 1.2784 Total 0.0769 6.0900e0039.0500e0031.0000e0053.0000e0043.0000e0043.0000e0043.0000e0040.0000 1.2766 1.2766 7.0000e0050.0000 1.2784 Unmitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 15 of 30 Date: 1/28/2023 8:23 PM Planning Area 1 Commercial and Restaurant SP Scenario - Riverside-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.6 Architectural Coating - 2024
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 2.0000e0051.0000e0051.5000e0040.0000 5.0000e0050.0000 6.0000e0051.0000e0050.0000 1.0000e0050.0000 0.0413 0.0413 0.0000 0.0000 0.0416 Total 2.0000e0051.0000e0051.5000e0040.0000 5.0000e0050.0000 6.0000e0051.0000e0050.0000 1.0000e0050.0000 0.0413 0.0413 0.0000 0.0000 0.0416 Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Archit. Coating 0.0760 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 9.0000e0046.0900e0039.0500e0031.0000e0053.0000e0043.0000e0043.0000e0043.0000e0040.0000 1.2766 1.2766 7.0000e0050.0000 1.2784 Total 0.0769 6.0900e0039.0500e0031.0000e0053.0000e0043.0000e0043.0000e0043.0000e0040.0000 1.2766 1.2766 7.0000e0050.0000 1.2784 Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 16 of 30 Date: 1/28/2023 8:23 PM Planning Area 1 Commercial and Restaurant SP Scenario - Riverside-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.6 Architectural Coating - 2024
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 2.0000e0051.0000e0051.5000e0040.0000 5.0000e0050.0000 6.0000e0051.0000e0050.0000 1.0000e0050.0000 0.0413 0.0413 0.0000 0.0000 0.0416 Total 2.0000e0051.0000e0051.5000e0040.0000 5.0000e0050.0000 6.0000e0051.0000e0050.0000 1.0000e0050.0000 0.0413 0.0413 0.0000 0.0000 0.0416 Mitigated Construction Off-Site
4.0 Operational Detail - Mobile
4.1 Mitigation Measures Mobile
CalEEMod Version: CalEEMod.2020.4.0 Page 17 of 30 Date: 1/28/2023 8:23 PM Planning Area 1 Commercial and Restaurant SP Scenario - Riverside-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Mitigated 0.4071 0.5484 3.5590 7.7800e0030.8409 6.4500e0030.8474 0.2246 6.0400e0030.2307 0.0000 736.7786 736.7786 0.0436 0.0392 749.5443 Unmitigated 0.4071 0.5484 3.5590 7.7800e0030.8409 6.4500e0030.8474 0.2246 6.0400e0030.2307 0.0000 736.7786 736.7786 0.0436 0.0392 749.5443
4.2 Trip Summary Information
4.3 Trip Type Information
Average Daily Trip Rate Unmitigated Mitigated
Land Use Weekday Saturday Sunday Annual VMT Annual VMT
General Office Building 399.79 399.79 399.79 1,287,921 1,287,921 High Turnover (Sit Down Restaurant) 412.90 412.90 412.90 562,715 562,715 Quality Restaurant 262.16 262.16 262.16 373,219 373,219 Total 1,074.86 1,074.86 1,074.86 2,223,855 2,223,855
Miles Trip % Trip Purpose %
Land Use H-W or C-W H-S or C-C H-O or C-NW H-W or C-W H-S or C-C H-O or C-NW Primary Diverted Pass-by General Office Building 16.60 8.40 6.90 33.00 48.00 19.00 77 19 4 High Turnover (Sit Down
Restaurant)
16.60 8.40 6.90 8.50 72.50 19.00 37 20 43
Quality Restaurant 16.60 8.40 6.90 12.00 69.00 19.00 38 18 44
4.4 Fleet Mix
Land Use LDA LDT1 LDT2 MDV LHD1 LHD2 MHD HHD OBUS UBUS MCY SBUS MH General Office Building 0.540541 0.056458 0.173793 0.136090 0.025268 0.007074 0.011525 0.018705 0.000610 0.000304 0.023606 0.001094 0.004932 High Turnover (Sit Down
Restaurant)
0.540541 0.056458 0.173793 0.136090 0.025268 0.007074 0.011525 0.018705 0.000610 0.000304 0.023606 0.001094 0.004932 CalEEMod Version: CalEEMod.2020.4.0 Page 18 of 30 Date: 1/28/2023 8:23 PM Planning Area 1 Commercial and Restaurant SP Scenario - Riverside-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied Quality Restaurant 0.540541 0.056458 0.173793 0.136090 0.025268 0.007074 0.011525 0.018705 0.000610 0.000304 0.023606 0.001094 0.004932
5.0 Energy Detail
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Electricity
Mitigated
0.0000 0.0000 0.0000 0.0000 0.0000 94.2604 94.2604 7.9600e0039.6000e00494.7467 Electricity
Unmitigated
0.0000 0.0000 0.0000 0.0000 0.0000 94.2604 94.2604 7.9600e0039.6000e00494.7467 NaturalGas
Mitigated
0.0153 0.1387 0.1165 8.3000e0040.0105 0.0105 0.0105 0.0105 0.0000 150.9833 150.9833 2.8900e0032.7700e003151.8806 NaturalGas
Unmitigated
0.0153 0.1387 0.1165 8.3000e0040.0105 0.0105 0.0105 0.0105 0.0000 150.9833 150.9833 2.8900e0032.7700e003151.8806
5.1 Mitigation Measures Energy
Historical Energy Use: N
CalEEMod Version: CalEEMod.2020.4.0 Page 19 of 30 Date: 1/28/2023 8:23 PM Planning Area 1 Commercial and Restaurant SP Scenario - Riverside-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
5.2 Energy by Land Use - NaturalGas
NaturalGa
s Use
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Land Use kBTU/yr tons/yr MT/yr
General Office
Building
20923 1.1000e0041.0300e0038.6000e0041.0000e0058.0000e0058.0000e0058.0000e0058.0000e0050.0000 1.1165 1.1165 2.0000e0052.0000e0051.1232 High Turnover (Sit
Down Restaurant)
1.71776e
+006
9.2600e0030.0842 0.0707 5.1000e0046.4000e0036.4000e0036.4000e0036.4000e0030.0000 91.6661 91.6661 1.7600e0031.6800e00392.2108 Quality
Restaurant
1.09064e
+006
5.8800e0030.0535 0.0449 3.2000e0044.0600e0034.0600e0034.0600e0034.0600e0030.0000 58.2007 58.2007 1.1200e0031.0700e00358.5466 Total 0.0153 0.1387 0.1165 8.4000e0040.0105 0.0105 0.0105 0.0105 0.0000 150.9833 150.9833 2.9000e0032.7700e003151.8806 Unmitigated
CalEEMod Version: CalEEMod.2020.4.0 Page 20 of 30 Date: 1/28/2023 8:23 PM Planning Area 1 Commercial and Restaurant SP Scenario - Riverside-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
5.2 Energy by Land Use - NaturalGas
NaturalGa
s Use
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Land Use kBTU/yr tons/yr MT/yr
General Office
Building
20923 1.1000e0041.0300e0038.6000e0041.0000e0058.0000e0058.0000e0058.0000e0058.0000e0050.0000 1.1165 1.1165 2.0000e0052.0000e0051.1232 High Turnover (Sit
Down Restaurant)
1.71776e
+006
9.2600e0030.0842 0.0707 5.1000e0046.4000e0036.4000e0036.4000e0036.4000e0030.0000 91.6661 91.6661 1.7600e0031.6800e00392.2108 Quality
Restaurant
1.09064e
+006
5.8800e0030.0535 0.0449 3.2000e0044.0600e0034.0600e0034.0600e0034.0600e0030.0000 58.2007 58.2007 1.1200e0031.0700e00358.5466 Total 0.0153 0.1387 0.1165 8.4000e0040.0105 0.0105 0.0105 0.0105 0.0000 150.9833 150.9833 2.9000e0032.7700e003151.8806 Mitigated
CalEEMod Version: CalEEMod.2020.4.0 Page 21 of 30 Date: 1/28/2023 8:23 PM Planning Area 1 Commercial and Restaurant SP Scenario - Riverside-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
5.3 Energy by Land Use - Electricity
Electricity
Use
Total CO2 CH4 N2O CO2e
Land Use kWh/yr MT/yr
General Office
Building
56059 9.9418 8.4000e0041.0000e0049.9931
High Turnover (Sit
Down Restaurant)
290808 51.5735 4.3500e0035.3000e00451.8396
Quality
Restaurant
184640 32.7451 2.7600e0033.4000e00432.9140
Total 94.2604 7.9500e0039.7000e00494.7467
Unmitigated
CalEEMod Version: CalEEMod.2020.4.0 Page 22 of 30 Date: 1/28/2023 8:23 PM Planning Area 1 Commercial and Restaurant SP Scenario - Riverside-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
6.1 Mitigation Measures Area
6.0 Area Detail
5.3 Energy by Land Use - Electricity
Electricity
Use
Total CO2 CH4 N2O CO2e
Land Use kWh/yr MT/yr
General Office
Building
56059 9.9418 8.4000e0041.0000e0049.9931
High Turnover (Sit
Down Restaurant)
290808 51.5735 4.3500e0035.3000e00451.8396
Quality
Restaurant
184640 32.7451 2.7600e0033.4000e00432.9140
Total 94.2604 7.9500e0039.7000e00494.7467
Mitigated
CalEEMod Version: CalEEMod.2020.4.0 Page 23 of 30 Date: 1/28/2023 8:23 PM Planning Area 1 Commercial and Restaurant SP Scenario - Riverside-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Mitigated 0.0669 0.0000 2.1000e0040.0000 0.0000 0.0000 0.0000 0.0000 0.0000 4.1000e0044.1000e0040.0000 0.0000 4.3000e004 Unmitigated 0.0669 0.0000 2.1000e0040.0000 0.0000 0.0000 0.0000 0.0000 0.0000 4.1000e0044.1000e0040.0000 0.0000 4.3000e004
6.2 Area by SubCategory
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
SubCategory tons/yr MT/yr
Architectural
Coating
7.6000e0030.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Consumer
Products
0.0593 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Landscaping 2.0000e0050.0000 2.1000e0040.0000 0.0000 0.0000 0.0000 0.0000 0.0000 4.1000e0044.1000e0040.0000 0.0000 4.3000e004 Total 0.0669 0.0000 2.1000e0040.0000 0.0000 0.0000 0.0000 0.0000 0.0000 4.1000e0044.1000e0040.0000 0.0000 4.3000e004 Unmitigated
CalEEMod Version: CalEEMod.2020.4.0 Page 24 of 30 Date: 1/28/2023 8:23 PM Planning Area 1 Commercial and Restaurant SP Scenario - Riverside-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
7.1 Mitigation Measures Water
7.0 Water Detail
6.2 Area by SubCategory
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
SubCategory tons/yr MT/yr
Architectural
Coating
7.6000e0030.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Consumer
Products
0.0593 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Landscaping 2.0000e0050.0000 2.1000e0040.0000 0.0000 0.0000 0.0000 0.0000 0.0000 4.1000e0044.1000e0040.0000 0.0000 4.3000e004 Total 0.0669 0.0000 2.1000e0040.0000 0.0000 0.0000 0.0000 0.0000 0.0000 4.1000e0044.1000e0040.0000 0.0000 4.3000e004 Mitigated
CalEEMod Version: CalEEMod.2020.4.0 Page 25 of 30 Date: 1/28/2023 8:23 PM Planning Area 1 Commercial and Restaurant SP Scenario - Riverside-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied Total CO2 CH4 N2O CO2e
Category MT/yr
Mitigated 12.7614 0.1382 3.3600e00317.2158
Unmitigated 12.7614 0.1382 3.3600e00317.2158
7.2 Water by Land Use
Indoor/Out
door Use
Total CO2 CH4 N2O CO2e
Land Use Mgal MT/yr
General Office
Building
1.08418 /
0.664495
4.1568 0.0357 8.7000e0045.3083
High Turnover (Sit
Down Restaurant)
1.91226 /
0.122059
5.2630 0.0627 1.5200e0037.2832
Quality
Restaurant
1.21413 /
0.077498
3.3416 0.0398 9.6000e0044.6243
Total 12.7614 0.1382 3.3500e00317.2158
Unmitigated
CalEEMod Version: CalEEMod.2020.4.0 Page 26 of 30 Date: 1/28/2023 8:23 PM Planning Area 1 Commercial and Restaurant SP Scenario - Riverside-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
7.2 Water by Land Use
Indoor/Out
door Use
Total CO2 CH4 N2O CO2e
Land Use Mgal MT/yr
General Office
Building
1.08418 /
0.664495
4.1568 0.0357 8.7000e0045.3083
High Turnover (Sit
Down Restaurant)
1.91226 /
0.122059
5.2630 0.0627 1.5200e0037.2832
Quality
Restaurant
1.21413 /
0.077498
3.3416 0.0398 9.6000e0044.6243
Total 12.7614 0.1382 3.3500e00317.2158
Mitigated
8.1 Mitigation Measures Waste
8.0 Waste Detail
CalEEMod Version: CalEEMod.2020.4.0 Page 27 of 30 Date: 1/28/2023 8:23 PM Planning Area 1 Commercial and Restaurant SP Scenario - Riverside-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied Total CO2 CH4 N2O CO2e
MT/yr
Mitigated 17.1101 1.0112 0.0000 42.3896
Unmitigated 17.1101 1.0112 0.0000 42.3896
Category/Year
8.2 Waste by Land Use
Waste
Disposed
Total CO2 CH4 N2O CO2e
Land Use tons MT/yr
General Office
Building
5.67 1.1510 0.0680 0.0000 2.8515
High Turnover (Sit
Down Restaurant)
74.97 15.2182 0.8994 0.0000 37.7025
Quality
Restaurant
3.65 0.7409 0.0438 0.0000 1.8356
Total 17.1101 1.0112 0.0000 42.3896
Unmitigated
CalEEMod Version: CalEEMod.2020.4.0 Page 28 of 30 Date: 1/28/2023 8:23 PM Planning Area 1 Commercial and Restaurant SP Scenario - Riverside-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
8.2 Waste by Land Use
Waste
Disposed
Total CO2 CH4 N2O CO2e
Land Use tons MT/yr
General Office
Building
5.67 1.1510 0.0680 0.0000 2.8515
High Turnover (Sit
Down Restaurant)
74.97 15.2182 0.8994 0.0000 37.7025
Quality
Restaurant
3.65 0.7409 0.0438 0.0000 1.8356
Total 17.1101 1.0112 0.0000 42.3896
Mitigated
9.0 Operational Offroad
Equipment Type Number Hours/Day Days/Year Horse Power Load Factor Fuel Type
10.0 Stationary Equipment
Fire Pumps and Emergency Generators
Equipment Type Number Hours/Day Hours/Year Horse Power Load Factor Fuel Type Boilers
Equipment Type Number Heat Input/Day Heat Input/Year Boiler Rating Fuel Type User Defined Equipment
Equipment Type Number
CalEEMod Version: CalEEMod.2020.4.0 Page 29 of 30 Date: 1/28/2023 8:23 PM Planning Area 1 Commercial and Restaurant SP Scenario - Riverside-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
11.0 Vegetation
CalEEMod Version: CalEEMod.2020.4.0 Page 30 of 30 Date: 1/28/2023 8:23 PM Planning Area 1 Commercial and Restaurant SP Scenario - Riverside-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied Terrrano II Apartments
Riverside-South Coast County, Annual
Project Characteristics -
Land Use - 2.96 acres
Construction Phase -
Off-road Equipment -
Off-road Equipment -
Off-road Equipment -
Off-road Equipment -
Off-road Equipment -
Grading -
Vehicle Trips - per TS
Construction Off-road Equipment Mitigation -
1.1 Land Usage
Land Uses Size Metric Lot Acreage Floor Surface Area Population Apartments Low Rise 50.00 Dwelling Unit 2.47 50,000.00 143 Parking Lot 55.00 Space 0.49 22,000.00 0
1.2 Other Project Characteristics
Urbanization
Climate Zone
Urban
10 Wind Speed (m/s) 2.4 Precipitation Freq (Days) 28
1.3 User Entered Comments & Non-Default Data
1.0 Project Characteristics
Utility Company Southern California Edison
Operational Year 2025
CO2 Intensity
(lb/MWhr)
390.98 CH4 Intensity 0.033
(lb/MWhr)
N2O Intensity 0.004
(lb/MWhr)
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 28 Date: 1/28/2023 1:56 PM Terrrano II Apartments - Riverside-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied Woodstoves - No hearth options will be provided
2.0 Emissions Summary
Table Name Column Name Default Value New Value
tblConstructionPhase PhaseEndDate 12/12/2024 11/28/2024 tblConstructionPhase PhaseStartDate 11/29/2024 11/15/2024 tblFireplaces NumberGas 42.50 0.00
tblFireplaces NumberNoFireplace 5.00 50.00
tblFireplaces NumberWood 2.50 0.00
tblLandUse LotAcreage 3.13 2.47
tblOffRoadEquipment LoadFactor 0.38 0.38
tblOffRoadEquipment OffRoadEquipmentType Rollers
tblVehicleTrips ST_TR 8.14 6.74
tblVehicleTrips SU_TR 6.28 6.74
tblVehicleTrips WD_TR 7.32 6.74
tblWoodstoves NumberCatalytic 2.50 0.00
tblWoodstoves NumberNoncatalytic 2.50 0.00
CalEEMod Version: CalEEMod.2020.4.0 Page 2 of 28 Date: 1/28/2023 1:56 PM Terrrano II Apartments - Riverside-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
2.1 Overall Construction
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Year tons/yr MT/yr
2024 0.3593 1.5251 1.7957 3.5100e0030.0645 0.0629 0.1274 0.0169 0.0601 0.0770 0.0000 299.3146 299.3146 0.0474 3.4700e003301.5327 Maximum 0.3593 1.5251 1.7957 3.5100e0030.0645 0.0629 0.1274 0.0169 0.0601 0.0770 0.0000 299.3146 299.3146 0.0474 3.4700e003301.5327 Unmitigated Construction
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Year tons/yr MT/yr
2024 0.3593 1.5251 1.7956 3.5100e0030.0632 0.0629 0.1260 0.0168 0.0601 0.0768 0.0000 299.3143 299.3143 0.0474 3.4700e003301.5324 Maximum 0.3593 1.5251 1.7956 3.5100e0030.0632 0.0629 0.1260 0.0168 0.0601 0.0768 0.0000 299.3143 299.3143 0.0474 3.4700e003301.5324 Mitigated Construction
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e
Percent
Reduction
0.00 0.00 0.00 0.00 2.03 0.00 1.04 0.89 0.00 0.18 0.00 0.00 0.00 0.00 0.00 0.00 CalEEMod Version: CalEEMod.2020.4.0 Page 3 of 28 Date: 1/28/2023 1:56 PM Terrrano II Apartments - Riverside-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied Quarter Start Date End Date Maximum Unmitigated ROG + NOX (tons/quarter) Maximum Mitigated ROG + NOX (tons/quarter) 1 1-1-2024 3-31-2024 0.4595 0.4595
2 4-1-2024 6-30-2024 0.4865 0.4865
3 7-1-2024 9-30-2024 0.4918 0.4918
Highest 0.4918 0.4918
2.2 Overall Operational
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Area 0.2136 5.9400e0030.5158 3.0000e0052.8600e0032.8600e0032.8600e0032.8600e0030.0000 0.8436 0.8436 8.1000e0040.0000 0.8639 Energy 4.0800e0030.0349 0.0148 2.2000e0042.8200e0032.8200e0032.8200e0032.8200e0030.0000 78.7005 78.7005 4.0100e0031.1300e00379.1381 Mobile 0.1577 0.2501 1.6384 3.9600e0030.4355 3.1900e0030.4387 0.1163 2.9900e0030.1193 0.0000 375.1057 375.1057 0.0187 0.0181 380.9670 Waste 0.0000 0.0000 0.0000 0.0000 4.6688 0.0000 4.6688 0.2759 0.0000 11.5667 Water 0.0000 0.0000 0.0000 0.0000 1.0335 11.5693 12.6028 0.1071 2.6200e00316.0632 Total 0.3753 0.2909 2.1691 4.2100e0030.4355 8.8700e0030.4443 0.1163 8.6700e0030.1250 5.7023 466.2191 471.9214 0.4066 0.0219 488.5989 Unmitigated Operational
CalEEMod Version: CalEEMod.2020.4.0 Page 4 of 28 Date: 1/28/2023 1:56 PM Terrrano II Apartments - Riverside-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
2.2 Overall Operational
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Area 0.2136 5.9400e0030.5158 3.0000e0052.8600e0032.8600e0032.8600e0032.8600e0030.0000 0.8436 0.8436 8.1000e0040.0000 0.8639 Energy 4.0800e0030.0349 0.0148 2.2000e0042.8200e0032.8200e0032.8200e0032.8200e0030.0000 78.7005 78.7005 4.0100e0031.1300e00379.1381 Mobile 0.1577 0.2501 1.6384 3.9600e0030.4355 3.1900e0030.4387 0.1163 2.9900e0030.1193 0.0000 375.1057 375.1057 0.0187 0.0181 380.9670 Waste 0.0000 0.0000 0.0000 0.0000 4.6688 0.0000 4.6688 0.2759 0.0000 11.5667 Water 0.0000 0.0000 0.0000 0.0000 1.0335 11.5693 12.6028 0.1071 2.6200e00316.0632 Total 0.3753 0.2909 2.1691 4.2100e0030.4355 8.8700e0030.4443 0.1163 8.6700e0030.1250 5.7023 466.2191 471.9214 0.4066 0.0219 488.5989 Mitigated Operational
3.0 Construction Detail
Construction Phase
Phase
Number
Phase Name Phase Type Start Date End Date Num Days
Week
Num Days Phase Description
1 Site Preparation Site Preparation 1/1/2024 1/3/2024 5 3 2 Grading Grading 1/4/2024 1/11/2024 5 6
3 Building Construction Building Construction 1/12/2024 11/14/2024 5 220 ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e
Percent
Reduction
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 CalEEMod Version: CalEEMod.2020.4.0 Page 5 of 28 Date: 1/28/2023 1:56 PM Terrrano II Apartments - Riverside-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied 4 Paving Paving 11/15/2024 11/28/2024 5 10
5 Architectural Coating Architectural Coating 11/15/2024 11/28/2024 5 10 OffRoad Equipment
Phase Name Offroad Equipment Type Amount Usage Hours Horse Power Load Factor Architectural Coating Air Compressors 1 6.00 78 0.48
Grading Rollers 1 7.00 80 0.38
Building Construction Cranes 1 8.00 231 0.29
Building Construction Forklifts 2 7.00 89 0.20
Building Construction Generator Sets 1 8.00 84 0.74
Grading Graders 1 8.00 187 0.41
Site Preparation Graders 1 8.00 187 0.41
Paving Pavers 1 8.00 130 0.42
Paving Paving Equipment 1 8.00 132 0.36
Paving Rollers 2 8.00 80 0.38
Building Construction Tractors/Loaders/Backhoes 1 6.00 97 0.37 Grading Tractors/Loaders/Backhoes 2 7.00 97 0.37
Site Preparation Tractors/Loaders/Backhoes 1 7.00 97 0.37 Building Construction Welders 3 8.00 46 0.45
Trips and VMT
Residential Indoor: 101,250; Residential Outdoor: 33,750; Non-Residential Indoor: 0; Non-Residential Outdoor: 0; Striped Parking Area: 1,320 (Architectural Coating – sqft)
Acres of Grading (Site Preparation Phase): 1.5
Acres of Grading (Grading Phase): 3
Acres of Paving: 0.49
CalEEMod Version: CalEEMod.2020.4.0 Page 6 of 28 Date: 1/28/2023 1:56 PM Terrrano II Apartments - Riverside-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.2 Site Preparation - 2024
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Fugitive Dust 8.0000e0040.0000 8.0000e0049.0000e0050.0000 9.0000e0050.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 7.2000e0048.1300e0035.4200e0031.0000e0052.9000e0042.9000e0042.7000e0042.7000e0040.0000 1.2309 1.2309 4.0000e0040.0000 1.2409 Total 7.2000e0048.1300e0035.4200e0031.0000e0058.0000e0042.9000e0041.0900e0039.0000e0052.7000e0043.6000e0040.0000 1.2309 1.2309 4.0000e0040.0000 1.2409 Unmitigated Construction On-Site
3.1 Mitigation Measures Construction
Water Exposed Area
Phase Name Offroad Equipment
Count
Worker Trip
Number
Vendor Trip
Number
Hauling Trip
Number
Worker Trip
Length
Vendor Trip
Length
Hauling Trip
Length
Worker Vehicle
Class
Vendor
Vehicle Class
Hauling
Vehicle Class
Architectural Coating 1 9.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT Building Construction 8 45.00 9.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT Grading 4 10.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT Paving 4 10.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT Site Preparation 2 5.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT CalEEMod Version: CalEEMod.2020.4.0 Page 7 of 28 Date: 1/28/2023 1:56 PM Terrrano II Apartments - Riverside-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.2 Site Preparation - 2024
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 2.0000e0052.0000e0052.2000e0040.0000 8.0000e0050.0000 8.0000e0052.0000e0050.0000 2.0000e0050.0000 0.0620 0.0620 0.0000 0.0000 0.0625 Total 2.0000e0052.0000e0052.2000e0040.0000 8.0000e0050.0000 8.0000e0052.0000e0050.0000 2.0000e0050.0000 0.0620 0.0620 0.0000 0.0000 0.0625 Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Fugitive Dust 3.6000e0040.0000 3.6000e0044.0000e0050.0000 4.0000e0050.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 7.2000e0048.1300e0035.4200e0031.0000e0052.9000e0042.9000e0042.7000e0042.7000e0040.0000 1.2309 1.2309 4.0000e0040.0000 1.2409 Total 7.2000e0048.1300e0035.4200e0031.0000e0053.6000e0042.9000e0046.5000e0044.0000e0052.7000e0043.1000e0040.0000 1.2309 1.2309 4.0000e0040.0000 1.2409 Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 8 of 28 Date: 1/28/2023 1:56 PM Terrrano II Apartments - Riverside-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.2 Site Preparation - 2024
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 2.0000e0052.0000e0052.2000e0040.0000 8.0000e0050.0000 8.0000e0052.0000e0050.0000 2.0000e0050.0000 0.0620 0.0620 0.0000 0.0000 0.0625 Total 2.0000e0052.0000e0052.2000e0040.0000 8.0000e0050.0000 8.0000e0052.0000e0050.0000 2.0000e0050.0000 0.0620 0.0620 0.0000 0.0000 0.0625 Mitigated Construction Off-Site
3.3 Grading - 2024
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Fugitive Dust 1.5900e0030.0000 1.5900e0031.7000e0040.0000 1.7000e0040.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 2.2000e0030.0240 0.0215 4.0000e0059.6000e0049.6000e0048.9000e0048.9000e0040.0000 3.7780 3.7780 1.2200e0030.0000 3.8085 Total 2.2000e0030.0240 0.0215 4.0000e0051.5900e0039.6000e0042.5500e0031.7000e0048.9000e0041.0600e0030.0000 3.7780 3.7780 1.2200e0030.0000 3.8085 Unmitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 9 of 28 Date: 1/28/2023 1:56 PM Terrrano II Apartments - Riverside-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.3 Grading - 2024
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 9.0000e0056.0000e0058.8000e0040.0000 3.3000e0040.0000 3.3000e0049.0000e0050.0000 9.0000e0050.0000 0.2478 0.2478 1.0000e0051.0000e0050.2498 Total 9.0000e0056.0000e0058.8000e0040.0000 3.3000e0040.0000 3.3000e0049.0000e0050.0000 9.0000e0050.0000 0.2478 0.2478 1.0000e0051.0000e0050.2498 Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Fugitive Dust 7.2000e0040.0000 7.2000e0048.0000e0050.0000 8.0000e0050.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 2.2000e0030.0240 0.0215 4.0000e0059.6000e0049.6000e0048.9000e0048.9000e0040.0000 3.7780 3.7780 1.2200e0030.0000 3.8085 Total 2.2000e0030.0240 0.0215 4.0000e0057.2000e0049.6000e0041.6800e0038.0000e0058.9000e0049.7000e0040.0000 3.7780 3.7780 1.2200e0030.0000 3.8085 Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 10 of 28 Date: 1/28/2023 1:56 PM Terrrano II Apartments - Riverside-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.3 Grading - 2024
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 9.0000e0056.0000e0058.8000e0040.0000 3.3000e0040.0000 3.3000e0049.0000e0050.0000 9.0000e0050.0000 0.2478 0.2478 1.0000e0051.0000e0050.2498 Total 9.0000e0056.0000e0058.8000e0040.0000 3.3000e0040.0000 3.3000e0049.0000e0050.0000 9.0000e0050.0000 0.2478 0.2478 1.0000e0051.0000e0050.2498 Mitigated Construction Off-Site
3.4 Building Construction - 2024
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Off-Road 0.1757 1.4106 1.5510 2.7500e0030.0592 0.0592 0.0567 0.0567 0.0000 228.4853 228.4853 0.0426 0.0000 229.5492 Total 0.1757 1.4106 1.5510 2.7500e0030.0592 0.0592 0.0567 0.0567 0.0000 228.4853 228.4853 0.0426 0.0000 229.5492 Unmitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 11 of 28 Date: 1/28/2023 1:56 PM Terrrano II Apartments - Riverside-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.4 Building Construction - 2024
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 1.0600e0030.0340 0.0134 1.7000e0046.2500e0032.8000e0046.5300e0031.8000e0032.7000e0042.0700e0030.0000 16.4002 16.4002 1.7000e0042.4200e00317.1261 Worker 0.0150 0.0106 0.1456 4.4000e0040.0544 2.5000e0040.0547 0.0145 2.3000e0040.0147 0.0000 40.8897 40.8897 9.4000e0041.0200e00341.2171 Total 0.0161 0.0446 0.1590 6.1000e0040.0607 5.3000e0040.0612 0.0163 5.0000e0040.0168 0.0000 57.2899 57.2899 1.1100e0033.4400e00358.3432 Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Off-Road 0.1757 1.4106 1.5510 2.7500e0030.0592 0.0592 0.0567 0.0567 0.0000 228.4851 228.4851 0.0426 0.0000 229.5489 Total 0.1757 1.4106 1.5510 2.7500e0030.0592 0.0592 0.0567 0.0567 0.0000 228.4851 228.4851 0.0426 0.0000 229.5489 Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 12 of 28 Date: 1/28/2023 1:56 PM Terrrano II Apartments - Riverside-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.4 Building Construction - 2024
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 1.0600e0030.0340 0.0134 1.7000e0046.2500e0032.8000e0046.5300e0031.8000e0032.7000e0042.0700e0030.0000 16.4002 16.4002 1.7000e0042.4200e00317.1261 Worker 0.0150 0.0106 0.1456 4.4000e0040.0544 2.5000e0040.0547 0.0145 2.3000e0040.0147 0.0000 40.8897 40.8897 9.4000e0041.0200e00341.2171 Total 0.0161 0.0446 0.1590 6.1000e0040.0607 5.3000e0040.0612 0.0163 5.0000e0040.0168 0.0000 57.2899 57.2899 1.1100e0033.4400e00358.3432 Mitigated Construction Off-Site
3.5 Paving - 2024
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Off-Road 3.2000e0030.0314 0.0458 7.0000e0051.5700e0031.5700e0031.4500e0031.4500e0030.0000 6.1594 6.1594 1.9900e0030.0000 6.2092 Paving 6.4000e0040.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 3.8400e0030.0314 0.0458 7.0000e0051.5700e0031.5700e0031.4500e0031.4500e0030.0000 6.1594 6.1594 1.9900e0030.0000 6.2092 Unmitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 13 of 28 Date: 1/28/2023 1:56 PM Terrrano II Apartments - Riverside-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.5 Paving - 2024
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 1.5000e0041.1000e0041.4700e0030.0000 5.5000e0040.0000 5.5000e0041.5000e0040.0000 1.5000e0040.0000 0.4130 0.4130 1.0000e0051.0000e0050.4163 Total 1.5000e0041.1000e0041.4700e0030.0000 5.5000e0040.0000 5.5000e0041.5000e0040.0000 1.5000e0040.0000 0.4130 0.4130 1.0000e0051.0000e0050.4163 Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Off-Road 3.2000e0030.0314 0.0458 7.0000e0051.5700e0031.5700e0031.4500e0031.4500e0030.0000 6.1594 6.1594 1.9900e0030.0000 6.2092 Paving 6.4000e0040.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 3.8400e0030.0314 0.0458 7.0000e0051.5700e0031.5700e0031.4500e0031.4500e0030.0000 6.1594 6.1594 1.9900e0030.0000 6.2092 Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 14 of 28 Date: 1/28/2023 1:56 PM Terrrano II Apartments - Riverside-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.5 Paving - 2024
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 1.5000e0041.1000e0041.4700e0030.0000 5.5000e0040.0000 5.5000e0041.5000e0040.0000 1.5000e0040.0000 0.4130 0.4130 1.0000e0051.0000e0050.4163 Total 1.5000e0041.1000e0041.4700e0030.0000 5.5000e0040.0000 5.5000e0041.5000e0040.0000 1.5000e0040.0000 0.4130 0.4130 1.0000e0051.0000e0050.4163 Mitigated Construction Off-Site
3.6 Architectural Coating - 2024
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Archit. Coating 0.1595 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 9.0000e0046.0900e0039.0500e0031.0000e0053.0000e0043.0000e0043.0000e0043.0000e0040.0000 1.2766 1.2766 7.0000e0050.0000 1.2784 Total 0.1604 6.0900e0039.0500e0031.0000e0053.0000e0043.0000e0043.0000e0043.0000e0040.0000 1.2766 1.2766 7.0000e0050.0000 1.2784 Unmitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 15 of 28 Date: 1/28/2023 1:56 PM Terrrano II Apartments - Riverside-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.6 Architectural Coating - 2024
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 1.4000e0041.0000e0041.3200e0030.0000 4.9000e0040.0000 5.0000e0041.3000e0040.0000 1.3000e0040.0000 0.3717 0.3717 1.0000e0051.0000e0050.3747 Total 1.4000e0041.0000e0041.3200e0030.0000 4.9000e0040.0000 5.0000e0041.3000e0040.0000 1.3000e0040.0000 0.3717 0.3717 1.0000e0051.0000e0050.3747 Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Archit. Coating 0.1595 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 9.0000e0046.0900e0039.0500e0031.0000e0053.0000e0043.0000e0043.0000e0043.0000e0040.0000 1.2766 1.2766 7.0000e0050.0000 1.2784 Total 0.1604 6.0900e0039.0500e0031.0000e0053.0000e0043.0000e0043.0000e0043.0000e0040.0000 1.2766 1.2766 7.0000e0050.0000 1.2784 Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 16 of 28 Date: 1/28/2023 1:56 PM Terrrano II Apartments - Riverside-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.6 Architectural Coating - 2024
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 1.4000e0041.0000e0041.3200e0030.0000 4.9000e0040.0000 5.0000e0041.3000e0040.0000 1.3000e0040.0000 0.3717 0.3717 1.0000e0051.0000e0050.3747 Total 1.4000e0041.0000e0041.3200e0030.0000 4.9000e0040.0000 5.0000e0041.3000e0040.0000 1.3000e0040.0000 0.3717 0.3717 1.0000e0051.0000e0050.3747 Mitigated Construction Off-Site
4.0 Operational Detail - Mobile
4.1 Mitigation Measures Mobile
CalEEMod Version: CalEEMod.2020.4.0 Page 17 of 28 Date: 1/28/2023 1:56 PM Terrrano II Apartments - Riverside-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Mitigated 0.1577 0.2501 1.6384 3.9600e0030.4355 3.1900e0030.4387 0.1163 2.9900e0030.1193 0.0000 375.1057 375.1057 0.0187 0.0181 380.9670 Unmitigated 0.1577 0.2501 1.6384 3.9600e0030.4355 3.1900e0030.4387 0.1163 2.9900e0030.1193 0.0000 375.1057 375.1057 0.0187 0.0181 380.9670
4.2 Trip Summary Information
4.3 Trip Type Information
Average Daily Trip Rate Unmitigated Mitigated
Land Use Weekday Saturday Sunday Annual VMT Annual VMT
Apartments Low Rise 337.00 337.00 337.00 1,151,580 1,151,580 Parking Lot 0.00 0.00 0.00
Total 337.00 337.00 337.00 1,151,580 1,151,580
Miles Trip % Trip Purpose %
Land Use H-W or C-W H-S or C-C H-O or C-NW H-W or C-W H-S or C-C H-O or C-NW Primary Diverted Pass-by Apartments Low Rise 14.70 5.90 8.70 40.20 19.20 40.60 86 11 3 Parking Lot 16.60 8.40 6.90 0.00 0.00 0.00 0 0 0
4.4 Fleet Mix
Land Use LDA LDT1 LDT2 MDV LHD1 LHD2 MHD HHD OBUS UBUS MCY SBUS MH Apartments Low Rise 0.540541 0.056458 0.173793 0.136090 0.025268 0.007074 0.011525 0.018705 0.000610 0.000304 0.023606 0.001094 0.004932 Parking Lot 0.540541 0.056458 0.173793 0.136090 0.025268 0.007074 0.011525 0.018705 0.000610 0.000304 0.023606 0.001094 0.004932
5.0 Energy Detail
CalEEMod Version: CalEEMod.2020.4.0 Page 18 of 28 Date: 1/28/2023 1:56 PM Terrrano II Apartments - Riverside-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Electricity
Mitigated
0.0000 0.0000 0.0000 0.0000 0.0000 38.3417 38.3417 3.2400e0033.9000e00438.5395 Electricity
Unmitigated
0.0000 0.0000 0.0000 0.0000 0.0000 38.3417 38.3417 3.2400e0033.9000e00438.5395 NaturalGas
Mitigated
4.0800e0030.0349 0.0148 2.2000e0042.8200e0032.8200e0032.8200e0032.8200e0030.0000 40.3588 40.3588 7.7000e0047.4000e00440.5986 NaturalGas
Unmitigated
4.0800e0030.0349 0.0148 2.2000e0042.8200e0032.8200e0032.8200e0032.8200e0030.0000 40.3588 40.3588 7.7000e0047.4000e00440.5986
5.1 Mitigation Measures Energy
Historical Energy Use: N
CalEEMod Version: CalEEMod.2020.4.0 Page 19 of 28 Date: 1/28/2023 1:56 PM Terrrano II Apartments - Riverside-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
5.2 Energy by Land Use - NaturalGas
NaturalGa
s Use
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Land Use kBTU/yr tons/yr MT/yr
Apartments Low
Rise
756296 4.0800e0030.0349 0.0148 2.2000e0042.8200e0032.8200e0032.8200e0032.8200e0030.0000 40.3588 40.3588 7.7000e0047.4000e00440.5986 Parking Lot 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 4.0800e0030.0349 0.0148 2.2000e0042.8200e0032.8200e0032.8200e0032.8200e0030.0000 40.3588 40.3588 7.7000e0047.4000e00440.5986 Unmitigated
NaturalGa
s Use
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Land Use kBTU/yr tons/yr MT/yr
Apartments Low
Rise
756296 4.0800e0030.0349 0.0148 2.2000e0042.8200e0032.8200e0032.8200e0032.8200e0030.0000 40.3588 40.3588 7.7000e0047.4000e00440.5986 Parking Lot 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 4.0800e0030.0349 0.0148 2.2000e0042.8200e0032.8200e0032.8200e0032.8200e0030.0000 40.3588 40.3588 7.7000e0047.4000e00440.5986 Mitigated
CalEEMod Version: CalEEMod.2020.4.0 Page 20 of 28 Date: 1/28/2023 1:56 PM Terrrano II Apartments - Riverside-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
6.0 Area Detail
5.3 Energy by Land Use - Electricity
Electricity
Use
Total CO2 CH4 N2O CO2e
Land Use kWh/yr MT/yr
Apartments Low
Rise
208498 36.9761 3.1200e0033.8000e00437.1669
Parking Lot 7700 1.3656 1.2000e0041.0000e0051.3726
Total 38.3417 3.2400e0033.9000e00438.5395
Unmitigated
Electricity
Use
Total CO2 CH4 N2O CO2e
Land Use kWh/yr MT/yr
Apartments Low
Rise
208498 36.9761 3.1200e0033.8000e00437.1669
Parking Lot 7700 1.3656 1.2000e0041.0000e0051.3726
Total 38.3417 3.2400e0033.9000e00438.5395
Mitigated
CalEEMod Version: CalEEMod.2020.4.0 Page 21 of 28 Date: 1/28/2023 1:56 PM Terrrano II Apartments - Riverside-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
6.1 Mitigation Measures Area
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Mitigated 0.2136 5.9400e0030.5158 3.0000e0052.8600e0032.8600e0032.8600e0032.8600e0030.0000 0.8436 0.8436 8.1000e0040.0000 0.8639 Unmitigated 0.2136 5.9400e0030.5158 3.0000e0052.8600e0032.8600e0032.8600e0032.8600e0030.0000 0.8436 0.8436 8.1000e0040.0000 0.8639 CalEEMod Version: CalEEMod.2020.4.0 Page 22 of 28 Date: 1/28/2023 1:56 PM Terrrano II Apartments - Riverside-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
6.2 Area by SubCategory
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
SubCategory tons/yr MT/yr
Architectural
Coating
0.0160 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Consumer
Products
0.1821 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hearth 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Landscaping 0.0155 5.9400e0030.5158 3.0000e0052.8600e0032.8600e0032.8600e0032.8600e0030.0000 0.8436 0.8436 8.1000e0040.0000 0.8639 Total 0.2136 5.9400e0030.5158 3.0000e0052.8600e0032.8600e0032.8600e0032.8600e0030.0000 0.8436 0.8436 8.1000e0040.0000 0.8639 Unmitigated
CalEEMod Version: CalEEMod.2020.4.0 Page 23 of 28 Date: 1/28/2023 1:56 PM Terrrano II Apartments - Riverside-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
7.1 Mitigation Measures Water
7.0 Water Detail
6.2 Area by SubCategory
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
SubCategory tons/yr MT/yr
Architectural
Coating
0.0160 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Consumer
Products
0.1821 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hearth 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Landscaping 0.0155 5.9400e0030.5158 3.0000e0052.8600e0032.8600e0032.8600e0032.8600e0030.0000 0.8436 0.8436 8.1000e0040.0000 0.8639 Total 0.2136 5.9400e0030.5158 3.0000e0052.8600e0032.8600e0032.8600e0032.8600e0030.0000 0.8436 0.8436 8.1000e0040.0000 0.8639 Mitigated
CalEEMod Version: CalEEMod.2020.4.0 Page 24 of 28 Date: 1/28/2023 1:56 PM Terrrano II Apartments - Riverside-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied Total CO2 CH4 N2O CO2e
Category MT/yr
Mitigated 12.6028 0.1071 2.6200e00316.0632
Unmitigated 12.6028 0.1071 2.6200e00316.0632
7.2 Water by Land Use
Indoor/Out
door Use
Total CO2 CH4 N2O CO2e
Land Use Mgal MT/yr
Apartments Low
Rise
3.2577 /
2.05377
12.6028 0.1071 2.6200e00316.0632
Parking Lot 0 / 0 0.0000 0.0000 0.0000 0.0000
Total 12.6028 0.1071 2.6200e00316.0632
Unmitigated
CalEEMod Version: CalEEMod.2020.4.0 Page 25 of 28 Date: 1/28/2023 1:56 PM Terrrano II Apartments - Riverside-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
7.2 Water by Land Use
Indoor/Out
door Use
Total CO2 CH4 N2O CO2e
Land Use Mgal MT/yr
Apartments Low
Rise
3.2577 /
2.05377
12.6028 0.1071 2.6200e00316.0632
Parking Lot 0 / 0 0.0000 0.0000 0.0000 0.0000
Total 12.6028 0.1071 2.6200e00316.0632
Mitigated
8.1 Mitigation Measures Waste
8.0 Waste Detail
Total CO2 CH4 N2O CO2e
MT/yr
Mitigated 4.6688 0.2759 0.0000 11.5667
Unmitigated 4.6688 0.2759 0.0000 11.5667
Category/Year
CalEEMod Version: CalEEMod.2020.4.0 Page 26 of 28 Date: 1/28/2023 1:56 PM Terrrano II Apartments - Riverside-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
8.2 Waste by Land Use
Waste
Disposed
Total CO2 CH4 N2O CO2e
Land Use tons MT/yr
Apartments Low
Rise
23 4.6688 0.2759 0.0000 11.5667
Parking Lot 0 0.0000 0.0000 0.0000 0.0000
Total 4.6688 0.2759 0.0000 11.5667
Unmitigated
Waste
Disposed
Total CO2 CH4 N2O CO2e
Land Use tons MT/yr
Apartments Low
Rise
23 4.6688 0.2759 0.0000 11.5667
Parking Lot 0 0.0000 0.0000 0.0000 0.0000
Total 4.6688 0.2759 0.0000 11.5667
Mitigated
9.0 Operational Offroad
CalEEMod Version: CalEEMod.2020.4.0 Page 27 of 28 Date: 1/28/2023 1:56 PM Terrrano II Apartments - Riverside-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
11.0 Vegetation
Equipment Type Number Hours/Day Days/Year Horse Power Load Factor Fuel Type
10.0 Stationary Equipment
Fire Pumps and Emergency Generators
Equipment Type Number Hours/Day Hours/Year Horse Power Load Factor Fuel Type Boilers
Equipment Type Number Heat Input/Day Heat Input/Year Boiler Rating Fuel Type User Defined Equipment
Equipment Type Number
CalEEMod Version: CalEEMod.2020.4.0 Page 28 of 28 Date: 1/28/2023 1:56 PM Terrrano II Apartments - Riverside-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied Project: 22-161 Terrano II Noise
NOISE ASSESSMENT
Terrano II
Multi-Family Development
City of Corona
Prepared for:
Rexco Development
1285 Corona Pointe Court Suite 102
Corona, CA 92879
Prepared By:
42428 Chisolm Trail
Murrieta, CA 92562
January 31, 2023
ii
Ldn Consulting, Inc. 1/31/23 22-161 Terrano II Noise
TABLE OF CONTENTS
TABLE OF CONTENTS .......................................................................................................................................... II LIST OF FIGURES ................................................................................................................................................ III LIST OF TABLES .................................................................................................................................................. III ATTACHMENTS ................................................................................................................................................. III GLOSSARY OF COMMON TERMS ....................................................................................................................... IV EXECUTIVE SUMMARY ....................................................................................................................................... V
1.0 PROJECT INTRODUCTION ........................................................................................................................... 1
1.1 PURPOSE OF THIS STUDY ........................................................................................................................................ 1
1.2 PROJECT LOCATION .............................................................................................................................................. 1
1.3 PROJECT DESCRIPTION AND PURPOSE ....................................................................................................................... 1
2.0 FUNDAMENTALS........................................................................................................................................ 4
2.1 ACOUSTICAL FUNDAMENTALS ................................................................................................................................. 4
2.2 VIBRATION FUNDAMENTALS ................................................................................................................................... 5
3.0 SIGNIFICANCE THRESHOLDS AND STANDARDS ........................................................................................... 7
3.1 CONSTRUCTION NOISE .......................................................................................................................................... 7
3.2 TRANSPORTATION NOISE STANDARDS ...................................................................................................................... 7
4.0 CONSTRUCTION NOISE AND VIBRATION ................................................................................................... 10
4.1 CONSTRUCTION NOISE METHODOLOGY .................................................................................................................. 10
4.2 FINDINGS AND MITIGATION FOR GRADING ACTIVITIES ............................................................................................... 10
4.3 FINDINGS AND MITIGATION FOR CONSTRUCTION VIBRATION ...................................................................................... 12
5.0 TRANSPORTATION NOISE ......................................................................................................................... 13
5.1 EXISTING NOISE ENVIRONMENT ONSITE ................................................................................................................. 13
5.2 FUTURE ONSITE NOISE PREDICTION ....................................................................................................................... 15
5.3 EXTERIOR NOISE FINDINGS AND MITIGATION ........................................................................................................... 17
5.4 INTERIOR NOISE LEVELS ....................................................................................................................................... 17
5.5 PROJECT RELATED OFFSITE TRANSPORTATION NOISE ................................................................................................ 18
6.0 REFERENCES ............................................................................................................................................. 19 iii
Ldn Consulting, Inc. 1/31/23 22-161 Terrano II Noise
LIST OF FIGURES
FIGURE 1-A: PROJECT VICINITY MAP ................................................................................................................... 2 FIGURE 1-B: PROJECT CONFIGURATION .............................................................................................................. 3 FIGURE 3-A: LAND USE NOISE COMPATIBILITY MATRIX ....................................................................................... 8 FIGURE 5-A: AMBIENT MONITORING LOCATIONS .............................................................................................. 14 FIGURE 5-B: MODELED RECEPTOR LOCATIONS ................................................................................................... 16
LIST OF TABLES
TABLE 2-1: HUMAN REACTION TO TYPICAL VIBRATION LEVELS ........................................................................... 6 TABLE 4-1: GRADING CONSTRUCTION NOISE LEVELS.......................................................................................... 11 TABLE 4-2: VIBRATION LEVELS FROM CONSTRUCTION ACTIVITIES (RESIDENTIAL RECEPTORS) ............................ 12 TABLE 5-1: MEASURED AMBIENT NOISE LEVELS ................................................................................................. 13 TABLE 5-2: FUTURE TRAFFIC PARAMETERS ........................................................................................................ 17 TABLE 5-3: FUTURE EXTERIOR NOISE LEVELS ...................................................................................................... 18 Attachments
DETAILED FUTURE NOISE MODEL INPUT AND OUTPUT FILES ............................................................................. 20 iv
Ldn Consulting, Inc. 1/31/23 22-161 Terrano II Noise
GLOSSARY OF COMMON TERMS
Sound Pressure Level (SPL): a ratio of one sound pressure to a reference pressure (Lref) of 20 μPa. Because of the dynamic range of the human ear, the ratio is calculated logarithmically by 20 log (L/Lref).
A-weighted Sound Pressure Level (dBA): Some frequencies of noise are more noticeable than others. To compensate for this fact, different sound frequencies are weighted more.
Minimum Sound Level (Lmin): Minimum SPL or the lowest SPL measured over the time interval using the A-weighted network and slow time weighting.
Maximum Sound Level (Lmax): Maximum SPL or the highest SPL measured over the time interval the A-weighted network and slow time weighting.
Equivalent sound level (Leq): the true equivalent sound level measured over the run time. Leq is the A-weighted steady sound level that contains the same total acoustical energy as the actual fluctuating sound level.
Day Night Sound Level (Ldn): Representing the Day/Night sound level, this measurement is a 24 –hour average sound level where 10 dB is added to all the readings that occur between 10 pm and 7 am. This is primarily used in community noise regulations where there is a 10 dB “Penalty” for nighttime noise. Typically, Ldn’s are measured using A weighting.
Community Noise Exposure Level (CNEL): The accumulated exposure to sound measured in a 24-hour sampling interval and artificially boosted during certain hours. For CNEL, samples taken between 7 pm and 10 pm are boosted by 5 dB; samples taken between 10 pm and 7 am are boosted by 10 dB.
Octave Band: An octave band is defined as a frequency band whose upper band-edge frequency is twice the lower band frequency.
Third-Octave Band: A third-octave band is defined as a frequency band whose upper bandedge frequency is 1.26 times the lower band frequency.
Response Time (F,S,I): The response time is a standardized exponential time weighting of the input signal according to fast (F), slow (S) or impulse (I) time response relationships. Time response can be described with a time constant. The time constants for fast, slow and impulse responses are 1.0 seconds, 0.125 seconds and 0.35 milliseconds, respectively. v
Ldn Consulting, Inc. 1/31/23 22-161 Terrano II Noise
EXECUTIVE SUMMARY
This noise study has been completed to determine the noise impacts associated with the development of the proposed Terrano II Multi-Family Residential project within the approved Dos Lagos Specific Plan EIR. The project consists of developing a 50-unit apartment complex on 2.96 acres. The project site is located east of Interstate 15, north of Dos Lagos Drive and West of Temescal Canyon Road in Planning Area 1 of the Dos Lagos Specific Plan in the City of Corona, CA.
Construction Noise
Construction noise levels at an average distance of 100 feet would attenuate or be reduced 6.0 dBA. Given this and the spatial separation of the equipment, the noise levels are projected to comply with the 75 dBA Leq exterior noise standard over 8 hours at the property lines.
Additionally, Project construction noise levels are considered exempt if activities occur within the hours specified in the City of Corona Municipal Code, Section 17.84.040 of 7:00 a.m. and 8:00 p.m. Monday through Saturday and 10:00 a.m. 6:00 p.m. on Sundays and federal holidays. At the time of this analysis, no Project construction activity is planned outside of the specified hours.
Therefore, no impacts are anticipated and no mitigation is required during construction of the proposed Project. Additionally, all equipment should be properly fitted with mufflers and all staging and maintenance should be conducted as far away for the existing residence as possible.
Construction Vibration
The Federal Transit Administration (FTA) has determined vibration levels that would cause annoyance to a substantial number of people and potential damage to building structures. The FTA criterion for vibration induced structural damage is 0.20 in/sec for the peak particle velocity (PPV). The FTA criterion for infrequent vibration induced annoyance is 80 Vibration Velocity (VdB) for residential uses.
The nearest vibration-sensitive uses are the residences located to the west, 50 feet or more from the proposed construction. The average vibration levels that would be experienced at the nearest vibration sensitive land uses to the east from temporary construction activities were found to be below 0.2 in/sec. Project construction activities would result in PPV levels below the FTA’s criteria for vibration induced structural damage. Therefore, Project construction activities would not result in vibration induced structural damage to residential buildings near the demolition and construction areas. Construction activities were found to generate levels of vibration below 80 VdB and would not exceed the FTA criteria for nuisance for nearby residential uses. Therefore, vibration impacts would be less than significant.
vi
Ldn Consulting, Inc. 1/31/23 22-161 Terrano II Noise
Onsite Transportation Noise
It was determined that the outdoor use areas provided by the common recreation area and the private patios and balconies were found to comply with the City of Corona Noise standards of 65 dBA CNEL without mitigation measures.
An interior noise level reduction of 24 dBA CNEL is needed for the proposed residential units. Based on the preliminary architectural plans provided by Summa Architecture, to meet the 45 dBA CNEL interior noise standard, a minimum STC 28 rated dual pane windows and mechanical ventilation is needed to achieve the necessary interior noise reductions to meet the City’s standard for the residential units.
Once the final architectural plans are prepared, the proposed project site will require an interior noise study be prepared prior to the issuance of building permits to determine the detailed components to reduce interior noise to 45 dBA CNEL.
Offsite Transportation Noise
The Project does not create a direct and cumulative noise increase of more than 3 dBA CNEL on the nearby roadways. Therefore, the Project’s direct contributions to off-site roadway noise increases will not cause any significant impacts to any existing or future noise sensitive land uses. 1 Ldn Consulting, Inc. 1/31/23 22-161 Terrano II Noise
1.0 PROJECT INTRODUCTION
1.1 Purpose of this Study
The purpose of this Noise study is to determine any potential noise impacts due to the proposed construction of the proposed project and also to determine potential noise impacts (if any) to the proposed project generated from offsite sources. Should impacts be determined, the intent of this study would be to recommend suitable mitigation measures to bring those impacts to a level that would be considered less then significant.
1.2 Project Location
The Project site is located in the City of Corona, in the western portion of Riverside County. A general project vicinity map is shown in Figure 1-A. The project site is located east of Interstate 15 and north of Dos Lagos Drive, at the northwest and southwest intersection of Temescal Canyon Road and Fashion Drive in Planning Area 1 of the Dos Lagos Specific Plan within the City of Corona. The project site is bounded to the north by the Home2 Suites by Hilton Hotel, to the west by existing apartments, to the south by a 76 gas station, and to the east by Temescal Canyon Road. Existing retail uses are located further north along Temescal Canyon Road. Existing residential uses are located to the east across Temescal Canyon Road.
1.3 Project Description and Purpose
The proposed project will consist of 50 multi-family units consisting of two-story townhomes and three-story flats across 7 buildings as shown in the Project site configuration provided in Figure 1-B. The homes will range from approximately 700 square feet (s.f.) to 1,300 s.f. and feature one to three bedrooms, depending on the home plan and layout. 2 Ldn Consulting, Inc. 1/31/23 22-161 Terrano II Noise
Figure 1-A: Project Vicinity Map
Project
Location
Source: Google Maps
3 Ldn Consulting, Inc. 1/31/23 22-161 Terrano II Noise
Figure 1-B: Project Configuration
Source: Summa Architecture, 2023
4 Ldn Consulting, Inc. 1/31/23 22-161 Terrano II Noise
2.0 FUNDAMENTALS
2.1 Acoustical Fundamentals
Noise is defined as unwanted or annoying sound which interferes with or disrupts normal activities. Exposure to high noise levels has been demonstrated to cause hearing loss. The individual human response to environmental noise is based on the sensitivity of that individual, the type of noise that occurs and when the noise occurs. Sound is measured on a logarithmic scale consisting of sound pressure levels known as a decibel (dB). The sounds heard by humans typically do not consist of a single frequency but of a broadband of frequencies having different sound pressure levels. The method for evaluating all the frequencies of the sound is to apply an A-weighting to reflect how the human ear responds to the different sound levels at different frequencies. The A-weighted sound level adequately describes the instantaneous noise whereas the equivalent sound level depicted as Leq represents a steady sound level containing the same total acoustical energy as the actual fluctuating sound level over a given time interval.
The Community Noise Equivalent Level (CNEL) is the 24-hour A-weighted average for sound, with corrections or penalties for evening and nighttime hours. The corrections require an addition of 5 decibels to sound levels in the evening hours between 7 p.m. and 10 p.m. and an addition of 10 decibels to sound levels at nighttime hours between 10 p.m. and 7 a.m. These additions are made to account for the increased sensitivity during the evening and nighttime hours when sounds appear louder.
A vehicles noise level is generated from a combination of noise produced by the engine, exhaust and tires. The cumulative traffic noise levels along a roadway segment are based on three primary factors: the amount of traffic, the travel speed of the traffic, and the vehicle mix ratio or number of medium and heavy trucks. The intensity of traffic noise is increased by higher traffic volumes, greater speeds and increased number of trucks.
Because mobile/traffic noise levels are calculated on a logarithmic scale, a doubling of the traffic noise or acoustical energy results in a noise level increase of 3 dBA. Therefore, the doubling of the traffic volume, without changing the vehicle speeds or mix ratio, results in a noise increase of 3 dBA. Mobile noise levels radiant in an almost oblique fashion from the source and drop off at a rate of 3 dBA for each doubling of distance under hard site conditions and at a rate of 4.5 dBA for soft site conditions.
Hard site conditions consist of concrete, asphalt and hard pack dirt while soft site conditions exist in areas having slight grade changes, landscaped areas and vegetation. On the other hand, fixed/point sources radiate outward uniformly as it travels away from the source. Their sound levels attenuate or drop off at a rate of 6 dBA for each doubling of distance. 5 Ldn Consulting, Inc. 1/31/23 22-161 Terrano II Noise
The most effective noise reduction methods consist of controlling the noise at the source, blocking the noise transmission with barriers or relocating the receiver. Any or all of these methods may be required to reduce noise levels to an acceptable level.
2.2 Vibration Fundamentals
Vibration is a trembling or oscillating motion of the ground. Like noise, vibration is transmitted in waves, but in this case through the ground or solid objects. Unlike noise, vibration is typically felt rather than heard. Vibration can be either natural as in the form of earthquakes, volcanic eruptions, or manmade as from explosions, heavy machinery, or trains. Both natural and manmade vibration may be continuous, such as from operating machinery; or infrequent, as from an explosion.
As with noise, vibration can be described by both its amplitude and frequency. Amplitude may be characterized in three ways: displacement, velocity, and acceleration. Particle displacement is a measure of the distance that a vibrated particle travels from its original position and for the purposes of soil displacement is typically measured in inches or millimeters. Particle velocity is the rate of speed at which soil particles move in inches per second or millimeters per second.
Particle acceleration is the rate of change in velocity with respect to time and is measured in inches per second or millimeters per second. Typically, particle velocity (measured in inches or millimeters per second) and/or acceleration (measured in gravities) are used to describe vibration.
Table 2-1 shows the human reaction to various levels of peak particle velocity.
Vibrations also vary in frequency and this affects perception. Typical construction vibrations fall in the 10 to 30 Hz range and usually occur around 15 Hz. Traffic vibrations exhibit a similar range of frequencies; however, due to their suspension systems, it is less common, to measure traffic frequencies above 30 Hz.
Propagation of ground-borne vibrations is complicated and difficult to predict because of the endless variations in the soil through which the waves travel. There are three main types of vibration propagation: surface, compression, and shear waves. Surface waves, or Rayleigh waves, travel along the ground’s surface. These waves carry most of their energy along an expanding circular wave front, similar to ripples produced by dropping an object into water. P-waves, or compression waves, are waves that carry their energy along an expanding spherical wave front.
The particle motion in these waves is longitudinal. S-waves, or shear waves, are also body waves that carry energy along an expanding spherical wave front. However, unlike P-waves, the particle motion is transverse, or side-to-side and perpendicular to the direction of propagation.
As vibration waves propagate from a source, the energy is spread over an ever-increasing area such that the energy level is reduced with the distance from the energy source. This geometric spreading loss is inversely proportional to the square of the distance. Wave energy is also reduced 6 Ldn Consulting, Inc. 1/31/23 22-161 Terrano II Noise
with distance as a result of material damping in the form of internal friction, soil layering, and special voids. The amount of attenuation provided by material damping varies with soil type and condition as well as the frequency of the wave.
Table 2-1: Human Reaction to Typical Vibration Levels
Vibration Level
Peak Particle Velocity
(in/sec)
Human Reaction Effect on Buildings
0.006–0.019 Threshold of perception, possibility of
intrusion
Vibrations unlikely to cause damage of any
type
0.08 Vibrations readily perceptible
Recommended upper level of vibration to
which ruins and ancient monuments should
be subjected
0.10 Level at which continuous vibration
begins to annoy people
Virtually no risk of “architectural” (i.e., not
structural) damage to normal buildings
0.20 Vibrations annoying to people in
buildings
Threshold at which there is a risk to
“architectural” damage to normal dwelling –
houses with plastered walls and ceilings
0.4–0.6
Vibrations considered unpleasant by
people subjected to continuous
vibrations and unacceptable to some
people walking on bridges
Vibrations at a greater level than normally
expected from traffic, but would cause
“architectural” damage and possibly minor
structural damage
Source: Caltrans, Division of Environmental Analysis, Transportation Related Earthborne Vibration, Caltrans Experiences, Technical Advisory, Vibration, TAV-02-01-R9601, 2020 (Caltrans, 2020). 7 Ldn Consulting, Inc. 1/31/23 22-161 Terrano II Noise
3.0 SIGNIFICANCE THRESHOLDS AND STANDARDS
3.1 Construction Noise
To control noise impacts associated with the construction of the proposed Project, the City has established limits to the hours of operation. Section 17.84.040 of the City’s Municipal Code indicates that construction noise is prohibited between the hours of 8:00 p.m. to 7:00 a.m., Monday through Saturday and 6:00 p.m. to 10:00 a.m. on Sundays and federal holidays.
Construction noise is defined as noise which is disturbing, excessive or offensive and constitutes a nuisance involving discomfort or annoyance to persons of normal sensitivity residing in the area, which is generated by the use of any tools, machinery or equipment used in connection with construction operations. The City of Corona Municipal Code effectively considers construction noise as exempt if construction noise is limited to the permitted hours of activity.
Neither the General Plan nor Municipal Code establish numeric maximum acceptable construction source noise levels at potentially affected receivers, which would allow for a quantified determination of what CEQA constitutes a substantial temporary or periodic noise increase. To allow for a quantified determination of what the City of Corona Municipal Code constitutes as noise that may be detrimental to the public health, safety or general welfare due to Project construction activity, relevant stationary source noise standards established in Table 1 of Section 17.84.040 are used in this analysis to assess the Project construction noise levels at nearby sensitive receivers. Table 1 of Section 17.84.040 establishes a maximum allowable exterior noise level standard for residential land use of 55 dBA L50 for a cumulative period of more 30 minutes in any hour. This same noise standard limits the exterior noise levels to the noise standard (55 dBA) plus 20 dBA for any period of time. This effectively limits the maximum noise level to 75 dBA Lmax. Therefore, consistent with the City of Corona Municipal Code, an exterior noise level of 75 dBA Lmax is used to describe the maximum acceptable threshold for determining the impacts due to Project construction for sensitive receivers.
3.2 Transportation Noise Standards
To control transportation related noise sources such as arterial roads, freeways, airports and railroads; the City of Corona has established guidelines for acceptable community noise levels in the City of Corona General Plan and Municipal Code. For noise sensitive residential uses, the City has established acceptable exterior noise levels of less than 65 dBA CNEL for outdoor living areas of multi-family dwellings. The applicable thresholds of the City of Corona are provided in Figure 3-A.
California Noise Insulation Standards (California Code of Regulations, Title 24) and the City of Corona Noise Code establish an interior noise standard of 45 dBA for multiple unit and hotel/motel structures. Acoustical studies must be prepared for multiple unit residential and hotel/motel 8 Ldn Consulting, Inc. 1/31/23 22-161 Terrano II Noise
structures that are proposed to be located within the Community Noise Equivalent Level (CNEL) noise contours of 60 dBA or greater. In addition, the City requires all proposed residential structures located within the CNEL noise contours of 60 or greater to prepare an acoustical study.
The studies must demonstrate that the building is designed to reduce interior noise to 45 dBA (CNEL) or lower.
Figure 3-A: Land Use Noise Compatibility Matrix
9 Ldn Consulting, Inc. 1/31/23 22-161 Terrano II Noise
3.3 Construction Vibration Standards
The City of Corona has not identified or adopted vibration standards. However, the United States Department of Transportation Federal Transit Administration (FTA) provides guidelines for maximum-acceptable vibration criteria for different types of land uses. These guidelines allow 80 VdB for human annoyance and 90 VdB for building damage at noise-sensitive uses and buildings where people normally sleep. Construction activity can result in varying degrees of ground-borne vibration, depending on the equipment and methods used, distance to the affected structures and soil type. Construction vibration is generally associated with pile driving and rock blasting.
Occasionally large bulldozers and loaded trucks can cause perceptible vibration levels at close proximity. While not enforceable regulations within the City of Corona, the FTA guidelines of 80 VdB for annoyance and 90 VdB for building damage at sensitive land uses provide the basis for determining the relative significance of potential Project-related vibration impacts. 10 Ldn Consulting, Inc. 1/31/23 22-161 Terrano II Noise
4.0 CONSTRUCTION NOISE AND VIBRATION
4.1 Construction Noise Methodology
Construction noise represents a short-term impact on the ambient noise levels. Noise generated by construction equipment includes haul trucks, water trucks, graders, dozers, loaders and scrapers can reach relatively high levels. Grading activities typically represent one of the highest potential sources for noise impacts. The most effective method of controlling construction noise is through local control of construction hours and by limiting the hours of construction to normal weekday working hours.
The U.S. Environmental Protection Agency (U.S. EPA) has compiled data regarding the noise generating characteristics of specific types of construction equipment. Noise levels generated by heavy construction equipment can range from 60 dBA to in excess of 100 dBA when measured at 50 feet. However, these noise levels diminish rapidly with distance from the construction site at a rate of approximately 6 dBA per doubling of distance. For example, a noise level of 75 dBA measured at 50 feet from the noise source to the receptor would be reduced to 69 dBA at 100 feet from the source to the receptor and reduced to 63 dBA at 200 feet from the source. Additionally, sound levels are logarithmic not linear, so adding two sources of 68 dBA plus 68 dBA is equal to 71 dBA not 136 dBA.
Using a point-source noise prediction methodology, calculations of the expected construction noise impacts were completed using the equation below. The essential model input data for these performance equations include the source levels of each type of equipment, relative source to receiver horizontal and vertical separations, the amount of time the equipment is operating in a given day, also referred to as the duty-cycle and any transmission loss from topography or barriers.
𝐿 = 10 ∗ 𝐿𝑜𝑔 ൭10ቀLi
10ቁ
n
𝑖=1
൱
For the grading phase, the equipment needed for the development will consist of a medium sized crawler type excavator, a small to medium sized road grader, a large rubber tired bulldozer, and two tractors/loaders/backhoes. Based on the EPA noise emissions, empirical data and the amount of equipment needed, worst case noise levels from the construction equipment for site preparation would occur during the grading operations.
4.2 Findings and Mitigation for Grading Activities
The grading activities will consist of the preparation of internal roadways, parking and the finished pads. The site has been previously mass graded and the existing grades are already at or near the proposed final grades, therefore, grading would be limited to precise grading activities. The 11 Ldn Consulting, Inc. 1/31/23 22-161 Terrano II Noise equipment will be spread out over the project site from distances near the occupied property lines to distances of 100 feet or more away. The nearest sensitive receptors are the existing residential land uses to the east. The list of equipment and the associated noise levels utilized in this analysis are shown in Table 4-1. The grading equipment will be spread out over the project site from distances near the occupied property lines to distances of 200 feet or more away. Based upon the site plan, on average, the grading operations will occur 100 feet from the property lines. This means that the average distance from all the equipment to the nearest property line is 100 feet.
As can be seen in Table 4-1, at an average distance of 100 feet from the construction activities to the nearest property line would result in a noise attenuation of -6.0 dBA without shielding.
Additionally, the amount of time equipment is operating during a normal work day, referred to as duty-cycle, was assumed to be 8 hours.
Table 4-1: Grading Construction Noise Levels
Construction Equipment Quantity
Source Level
@ 50-Feet
(dBA Leq)1
Duty Cycle
(Hours/Day)
Cumulative Noise
Level @ 50-Feet
(dBA Leq-8)
Rubber Tire Dozer 1 74 8 74.0
Excavator 1 72 8 72.0
Grader 1 73 8 73.0
Tractors/Loaders/Backhoes 2 72 8 75.0
Cumulative Levels @ 50 Feet 79.7
Average Distance to Property Line (Feet) 100
Noise Reduction Due to Distance -6.0
NEAREST PROPERTY LINE NOISE LEVEL 73.7
1 Source: Empirical Data
Given this, the noise levels will comply with the 75 dBA Leq exterior noise standard over 8 hours at the property lines. Additionally, Project construction noise levels are considered exempt if activities occur within the hours specified in the City of Corona Municipal Code, Section 17.84.040 of 7:00 a.m. and 8:00 p.m. Monday through Saturday and 10:00 a.m. 6:00 p.m. on Sundays and federal holidays. At the time of this analysis, no Project construction activity is planned outside of the specified hours. Therefore, no impacts are anticipated and no mitigation is required during construction of the proposed Project. Additionally, all equipment should be properly fitted with mufflers and all staging and maintenance should be conducted as far away from the existing residences as possible.
12 Ldn Consulting, Inc. 1/31/23 22-161 Terrano II Noise
4.3 Findings and Mitigation for Construction Vibration
The nearest vibration-sensitive uses are the residences located to the west of the project site, 50 feet or more from the proposed construction. Table 4-2 lists the average vibration levels that would be experienced at the nearest vibration sensitive land uses to the east from temporary construction activities. Loaded trucks will be traveling along the western portion of the site and were assessed at a minimum distance of 50 feet from to be conservative.
The FTA has determined vibration levels that would cause annoyance to a substantial number of people and potential damage to building structures. The FTA criterion for vibration induced structural damage is 0.20 in/sec for the peak particle velocity (PPV). Project construction activities would result in PPV levels below the FTA’s criteria for vibration induced structural damage.
Therefore, Project construction activities would not result in vibration induced structural damage to residential buildings near the construction areas. The FTA criterion for infrequent vibration induced annoyance is 80 Vibration Velocity (VdB) for residential uses. Construction activities would generate levels of vibration that would not exceed the FTA criteria for nuisance for nearby residential uses. Therefore, vibration impacts would be less than significant.
Table 4-2: Vibration Levels from Construction Activities (Residential Receptors) Equipment
Approximate
Velocity Level
at 25 Feet
(VdB)
Approximate
RMS Velocity
at 25 Feet
(in/sec)
Approximate
Velocity Level
at 50 Feet
(VdB)1
Approximate
RMS Velocity
at 50 Feet
(in/sec)2
Small bulldozer 58 0.003 46.0 0.0011
Jackhammer 79 0.035 67.0 0.0124
Loaded trucks 86 0.076 74.0 0.0269
Large bulldozer 87 0.089 75.0 0.0315
FTA Criteria 80 0.2
Significant Impact? No No
1 VdB = VdB(25 feet) – 30log(d/25) provided by the FTA
2 PPV at Distance D = PPVref x (25/D)1.5 provided by the FTA 13 Ldn Consulting, Inc. 1/31/23 22-161 Terrano II Noise
5.0 TRANSPORTATION NOISE
5.1 Existing Noise Environment Onsite
Noise measurements were taken using a Larson-Davis Model LxT Type 1 precision sound level meter, programmed, in "slow" mode, to record noise levels in "A" weighted form. The sound level meter and microphone were mounted on a tripod, five feet above the ground and equipped with a windscreen during all measurements. The sound level meter was calibrated before and after the monitoring using a Larson-Davis calibrator, Model CAL 200.
Monitoring location 1 (ML1) was located at the eastern portion of the project site. The results of the noise level measurement are presented in Table 5-1.
The noise measurement was monitored for a time period of 15 minutes during typical traffic conditions. The existing noise levels in the project area consisted primarily of traffic from Temescal Canyon Road. The ambient Leq noise levels measured in the area of the Project during the afternoon hours was found to be 59.8 dBA. The statistical indicators Lmax, Lmin, L10, L50 and L90, are given for the monitoring location. As can be seen from the L90 data, 90% of the time the noise level is approximately 54 dBA from Temescal Canyon Road. The noise monitoring locations are provided graphically in Figure 5-A.
Table 5-1: Measured Ambient Noise Levels
Measurement
Identification Description Time
Noise Levels (dBA)
Leq15 Lmax Lmin L10 L50 L90
M1 Temescal
Canyon Road 11:00 – 11:15 a.m. 59.8 66.7 51.2 63.1 58.2 54.0 Source: Ldn Consulting November 29, 2022
14 Ldn Consulting, Inc. 1/31/23 22-161 Terrano II Noise Figure 5-A: Ambient Monitoring Locations
M1
15 Ldn Consulting, Inc. 1/31/23 22-161 Terrano II Noise
5.2 Future Onsite Noise Prediction
To determine the future noise environment and impact potentials the Caltrans Sound32 noise model was utilized. The critical model input parameters, which determine the projected vehicular traffic noise levels, include vehicle travel speeds, the percentages of automobiles, medium trucks and heavy trucks in the roadway volume, the site conditions (hard or soft) and the peak hour traffic volume. The peak hour traffic volumes along most roadways range between 6-10% of the average daily traffic (ADT). The capacity in a single freeway lane is 1,950 vehicles per hour due to shortened headways between vehicles (Source: Caltrans). Thus, peak hour traffic values along Interstate 15 were calculated using a worst-case scenario capacity of 1,950 vehicles per hour per lane operating at a Level of Service C.
Table 5-2 presents the roadway parameters used in the analysis. The vehicle mix provides the hourly distribution percentages of automobile, medium trucks and heavy trucks. A traffic mix of
94.39/1.95/3.66 was utilized for Interstate 15 based on Caltrans Annual Average Truck Trip volumes. The Buildout peak hour traffic volume forecasts along Dos Lagos Drive and Temescal Canyon Road were provided in the Terrano at Dos Lagos Traffic Impact Analysis Report by LLG, 2015. The peak hour traffic volumes range between 6-12% of the average daily traffic (ADT).
Per the Caltrans Technical Noise Supplement (November, 2009), 10 percent of the average daily traffic volumes were entered into the noise model to provide a CNEL-equivalent noise output.
The required coordinate information necessary for the Sound32 traffic noise prediction model input was taken from the conceptual site plans provided by Summa Architecture, January 2023.
To determine the future noise levels, the site plans were used to identify the pad elevations, the roadway elevations and the relationship between the noise source(s) and the receptors. To evaluate the future potential noise impacts on the proposed development, outdoor observers were located in the outdoor areas and modeled observers were placed five feet above the finished pad elevation.
The modeled observer locations for the most affected units are presented in Figure 5-B.
Table 5-2 on the following page describes the roadway parameters used in the analysis including the peak traffic volumes, vehicle speeds and the hourly traffic flow distribution (vehicle mix) for the future Buildout conditions. The vehicle mix provides the hourly percentages of automobile, medium trucks and heavy trucks for input into the model.
16 Ldn Consulting, Inc. 1/31/23 22-161 Terrano II Noise Figure 5-B: Modeled Receptor Locations
6 7
5 4
3 2
1 9
8 9 Receptor Locations
17 Ldn Consulting, Inc. 1/31/23 22-161 Terrano II Noise Table 5-2: Future Traffic Parameters
Roadway
Future Peak
Hour Traffic
(ADT)
Modeled Speeds
(MPH)
Vehicle Mix % 2
Auto Medium
Trucks
Heavy
Trucks
Interstate 15 15,600 65 94.39 1.95 3.66
Temescal Canyon Road 2,3151 45 97.42 1.84 0.74
Dos Lagos Drive 1,2381 35 97.42 1.84 0.74 1
Source: Terrano at Dos Lagos Traffic Study, LLG 2015
2 Typical Vehicle Mixed observed in Southern California was used for local roadways.
Outdoor usable space is provided by the common recreational area located in the northeast portion of the project site and by the private patios and balconies at the units. The proposed patios and balconies will be partially shielded from the roadways by the proposed building facades. Typically, three decibels of attenuation is allowed for the first row of buildings when they block 40 to 65% of the line of sight to the noise source, and three to five decibels of attenuation is allowed when the buildings obstruct more than 65% of the line of sight (Source: CALTRANS Technical Noise Supplement Section N-5515). Based on the architectural plans, the proposed patios and balconies will be tucked into the building and will be shielded on one or both sides by the proposed building facades, therefore a factor of 5 dBA was taken into account.
5.3 Exterior Noise Findings and Mitigation
The modeling results for the Buildout analysis are quantitatively shown in Table 5-3. The line of sight at the patios and balconies will be blocked by the proposed building facades, therefore a factor of 5 dBA was taken into account. Therefore, the outdoor use areas were found to comply with the City of Corona’s Noise Standard of 65 dBA CNEL without mitigation. The modeling inputs and outputs are provided as Attachment A.
5.4 Interior Noise Levels
The City requires for residential developments an interior noise limit of 45 dBA CNEL for all residential uses. Based on numerous studies and efficiency standards in current residential Title 24 standards, residential structures provide 15 decibels of reduction with the windows open to the indoor uses and 25 decibels of reduction with the windows closed. This assumes a minimum sound transmission rating (STC) of 28 on the glass assemblies, which is a standard assembly. To maintain a 45 dBA noise level within the residential structures, the building façade noise should be 70 dBA or less. It should be noted: if better/higher STC rated glass assemblies are installed the noise levels would be reduced more than 25 decibels. Therefore, this is a conservative approach.
18 Ldn Consulting, Inc. 1/31/23 22-161 Terrano II Noise Table 5-3: Future Exterior Noise Levels
Receptor
Number
First Floor
Noise Levels
(dBA CNEL)
Second Floor
Noise Level
(dBA CNEL)
Third Floor
Noise Level
(dBA CNEL)
1 62 65 65
2 61 64 65
3 61 63 64
4 61 63 64
5 66 69 69
6 66 69 69
7 67 69 69
8 64 67 67
Recreation Area 64 -- --
*Noise levels at the proposed patios/balconies will be reduced 5 dBA due to shielding from the building
5.5 Project Related Offsite Transportation Noise
To determine if direct or cumulative off-site noise level increases associated with the development of the proposed project would create noise impacts. The traffic volumes for the existing conditions were compared with the traffic volume increase of existing plus the proposed project. According to the Project traffic study (Linscott Law & Greenspan, 2023), the project is estimated to only generate 337 daily trips with a peak hour volume of 26 trips. The existing average daily traffic (ADT) volumes on the area roadways are more than several thousand ADT.
Typically it requires a project to double (or add 100%) the traffic volumes to have a direct impact of 3 dBA CNEL or be a major contributor to the cumulative traffic volumes. The project will add less than a 5% increase to the exiting roadway volumes and no direct or cumulative impacts are anticipated.
19 Ldn Consulting, Inc. 1/31/23 22-161 Terrano II Noise
6.0 REFERENCES
Caltrans. (2006). Technical Noise Supplement Section N-5515. Retrieved from https://dot.ca.gov/-/media/dot-media/programs/environmentalanalysis/documents/env/tcvgm-apr2020-a11y.pdf Federal Transit Administration. (2018). Transit Noise and Vibration Impact Assessment Manual.
FHWA. (1978). Highway Traffic Noise Prediction Model. FHWA-RD-77-108.
Linscott Law & Greenspan. (2023). Traffic Circulation Assessment for the Proposed Terrano II Apartments at Dos Lagos Project. Retrieved from
https://www.jurupavalley.org/DocumentCenter/View/1979/Appendix-N_Noise-ImpactAnalysis?bidId=
ATTACHMENT A
DETAILED FUTURE NOISE MODEL INPUT AND OUTPUT FILES
TERRANO II GROUND LEVEL UNMITIGATED
T-PEAK HOUR TRAFFIC CONDITIONS, 1
5522 , 65 , 114 , 65 , 214 , 65
T-PEAK HOUR TRAFFIC CONDITIONS, 2
5522 , 65 , 114 , 65 , 214 , 65
T-PEAK HOUR TRAFFIC CONDITIONS, 3
2255 , 45 , 43 , 45 , 17 , 45
T-PEAK HOUR TRAFFIC CONDITIONS, 4
1206 , 35 , 23 , 35 , 9 , 35
T-PEAK HOUR TRAFFIC CONDITIONS, 5
1020 , 45 , 19 , 45 , 8 , 45
L-I-15 NB, 1
N,441,1342,930,
N,751,1476,931,
N,1907,1977,928,
N,2227,2116,927,
L-I-15 SB, 2
N,395,1448,930,
N,714,1586,931,
N,1862,2081,928,
N,2183,2220,927,
L-TEMESCAL CANYON, 3
N,654,675,870,
N,1003,677,869,
N,1627,682,866,
N,1849,695,867,
N,2104,742,868,
N,2343,817,869,
L-DOS LAGOS, 4
N,682,1680,913,
N,801,1328,900,
N,852,1179,895,
N,894,1071,889,
N,947,960,882,
N,978,857,874,
N,1003,677,868,
L-ON-RAMP, 5
N,801,1328,900,
N,1395.,1659,919,
N,1578.,1761,923,
N,1918.,1951,928,
B-FREEWAY TS-1, 1 , 2 , 0 ,0
449.,1323,930,930,
757.,1457,931,931,
B-FREEWAY TS-2, 2 , 2 , 0 ,0
759.,1458,931,931,
1915.,1958,928,928,
B-SITE TS WEST, 3 , 2 , 0 ,0
1102.,1432,910,910,
1251.,1522,913,913,
1257.,1568,913,913,
1410.,1653,919,919,
1588.,1751,923,923,
1639.,1709,923,923,
1752.,1777,927,927,
1954.,1881,928,928,
2270.,2025,927,927,
B-SITE TS EAST, 4 , 2 , 0 ,0
1063.,955,879,879,
1027.,935,879,879,
1032.,908,877,877,
1051.,832,873,873,
1049.,779,871,871,
1080.,735,869,869,
1622.,736,866,866,
1841.,750,867,867,
2086.,797,868,868,
2326.,876,869,869,
B-DL TS WEST, 5 , 1 , 0 ,0
1102.,1432,910,910,
958.,1354,901,901,
895.,1287,899,899,
931.,1170,893,893,
1009.,983,882,882,
1069.,995,881,881,
R, 1 , 65 ,10
1370,918,878.,
R, 2 , 65 ,10
1547,953,878.,
R, 3 , 65 ,10
1685,982,878.,
R, 4 , 65 ,10
1793,975,878.,
R, 5 , 65 ,10
1370,787,878.,
R, 6 , 65 ,10
1575,788,878.,
R, 7 , 65 ,10
1727,781,878.,
R, 8 , 65 ,10
1826,841,878.,
R, 9 , 65 ,10
1878,846,878.,REC
D, 4.5
1 ,ALL
D, 4.5
2 ,ALL
D, 4.5
3 ,ALL
D, 4.5
4 ,ALL
D, 4.5
5 ,ALL
K,-5
1 ,ALL
K,-5
2 ,ALL
K,-5
4 ,ALL
K,-5
5 ,ALL
C,C
SOUND32 - RELEASE 07/30/91
TITLE:
TERRANO II GROUND LEVEL UNMITIGATED
REC REC ID DNL PEOPLE LEQ(CAL)
--------------------------------
1 R-1 65. 10. 61.8
2 R-2 65. 10. 61.3
3 R-3 65. 10. 60.9
4 R-4 65. 10. 60.8
5 R-5 65. 10. 66.3
6 R-6 65. 10. 66.3
7 R-7 65. 10. 67.1
8 R-8 65. 10. 64.4
9 REC 65. 10. 64.4
--------------------------------
TERRANO II SECOND LEVEL UNMITIGATED
T-PEAK HOUR TRAFFIC CONDITIONS, 1
5522 , 65 , 114 , 65 , 214 , 65
T-PEAK HOUR TRAFFIC CONDITIONS, 2
5522 , 65 , 114 , 65 , 214 , 65
T-PEAK HOUR TRAFFIC CONDITIONS, 3
2255 , 45 , 43 , 45 , 17 , 45
T-PEAK HOUR TRAFFIC CONDITIONS, 4
1206 , 35 , 23 , 35 , 9 , 35
T-PEAK HOUR TRAFFIC CONDITIONS, 5
1020 , 45 , 19 , 45 , 8 , 45
L-I-15 NB, 1
N,441,1342,930,
N,751,1476,931,
N,1907,1977,928,
N,2227,2116,927,
L-I-15 SB, 2
N,395,1448,930,
N,714,1586,931,
N,1862,2081,928,
N,2183,2220,927,
L-TEMESCAL CANYON, 3
N,654,675,870,
N,1003,677,869,
N,1627,682,866,
N,1849,695,867,
N,2104,742,868,
N,2343,817,869,
L-DOS LAGOS, 4
N,682,1680,913,
N,801,1328,900,
N,852,1179,895,
N,894,1071,889,
N,947,960,882,
N,978,857,874,
N,1003,677,868,
L-ON-RAMP, 5
N,801,1328,900,
N,1395.,1659,919,
N,1578.,1761,923,
N,1918.,1951,928,
B-FREEWAY TS-1, 1 , 2 , 0 ,0
449.,1323,930,930,
757.,1457,931,931,
B-FREEWAY TS-2, 2 , 2 , 0 ,0
759.,1458,931,931,
1915.,1958,928,928,
B-SITE TS WEST, 3 , 2 , 0 ,0
1102.,1432,910,910,
1251.,1522,913,913,
1257.,1568,913,913,
1410.,1653,919,919,
1588.,1751,923,923,
1639.,1709,923,923,
1752.,1777,927,927,
1954.,1881,928,928,
2270.,2025,927,927,
B-SITE TS EAST, 4 , 2 , 0 ,0
1063.,955,879,879,
1027.,935,879,879,
1032.,908,877,877,
1051.,832,873,873,
1049.,779,871,871,
1080.,735,869,869,
1622.,736,866,866,
1841.,750,867,867,
2086.,797,868,868,
2326.,876,869,869,
B-DL TS WEST, 5 , 1 , 0 ,0
1102.,1432,910,910,
958.,1354,901,901,
895.,1287,899,899,
931.,1170,893,893,
1009.,983,882,882,
1069.,995,881,881,
R, 1 , 65 ,10
1370,918,888.,
R, 2 , 65 ,10
1547,953,888.,
R, 3 , 65 ,10
1685,982,888.,
R, 4 , 65 ,10
1793,975,888.,
R, 5 , 65 ,10
1370,787,888.,
R, 6 , 65 ,10
1575,788,888.,
R, 7 , 65 ,10
1727,781,888.,
R, 8 , 65 ,10
1826,841,888.,
D, 4.5
1 ,ALL
D, 4.5
2 ,ALL
D, 4.5
4 ,ALL
D, 4.5
5 ,ALL
K,-5
1 ,ALL
K,-5
2 ,ALL
K,-5
4 ,ALL
K,-5
5 ,ALL
C,C
SOUND32 - RELEASE 07/30/91
TITLE:
TERRANO II SECOND LEVEL UNMITIGATED
REC REC ID DNL PEOPLE LEQ(CAL)
--------------------------------
1 R-1 65. 10. 64.9
2 R-2 65. 10. 63.5
3 R-3 65. 10. 62.8
4 R-4 65. 10. 63.1
5 R-5 65. 10. 68.6
6 R-6 65. 10. 68.6
7 R-7 65. 10. 69.2
8 R-8 65. 10. 67.2
--------------------------------
TERRANO II THIRD LEVEL UNMITIGATED
T-PEAK HOUR TRAFFIC CONDITIONS, 1
5522 , 65 , 114 , 65 , 214 , 65
T-PEAK HOUR TRAFFIC CONDITIONS, 2
5522 , 65 , 114 , 65 , 214 , 65
T-PEAK HOUR TRAFFIC CONDITIONS, 3
2255 , 45 , 43 , 45 , 17 , 45
T-PEAK HOUR TRAFFIC CONDITIONS, 4
1206 , 35 , 23 , 35 , 9 , 35
T-PEAK HOUR TRAFFIC CONDITIONS, 5
1020 , 45 , 19 , 45 , 8 , 45
L-I-15 NB, 1
N,441,1342,930,
N,751,1476,931,
N,1907,1977,928,
N,2227,2116,927,
L-I-15 SB, 2
N,395,1448,930,
N,714,1586,931,
N,1862,2081,928,
N,2183,2220,927,
L-TEMESCAL CANYON, 3
N,654,675,870,
N,1003,677,869,
N,1627,682,866,
N,1849,695,867,
N,2104,742,868,
N,2343,817,869,
L-DOS LAGOS, 4
N,682,1680,913,
N,801,1328,900,
N,852,1179,895,
N,894,1071,889,
N,947,960,882,
N,978,857,874,
N,1003,677,868,
L-ON-RAMP, 5
N,801,1328,900,
N,1395.,1659,919,
N,1578.,1761,923,
N,1918.,1951,928,
B-FREEWAY TS-1, 1 , 2 , 0 ,0
449.,1323,930,930,
757.,1457,931,931,
B-FREEWAY TS-2, 2 , 2 , 0 ,0
759.,1458,931,931,
1915.,1958,928,928,
B-SITE TS WEST, 3 , 2 , 0 ,0
1102.,1432,910,910,
1251.,1522,913,913,
1257.,1568,913,913,
1410.,1653,919,919,
1588.,1751,923,923,
1639.,1709,923,923,
1752.,1777,927,927,
1954.,1881,928,928,
2270.,2025,927,927,
B-SITE TS EAST, 4 , 2 , 0 ,0
1063.,955,879,879,
1027.,935,879,879,
1032.,908,877,877,
1051.,832,873,873,
1049.,779,871,871,
1080.,735,869,869,
1622.,736,866,866,
1841.,750,867,867,
2086.,797,868,868,
2326.,876,869,869,
B-DL TS WEST, 5 , 1 , 0 ,0
1102.,1432,910,910,
958.,1354,901,901,
895.,1287,899,899,
931.,1170,893,893,
1009.,983,882,882,
1069.,995,881,881,
R, 1 , 65 ,10
1370,918,898.,
R, 2 , 65 ,10
1547,953,898.,
R, 3 , 65 ,10
1685,982,898.,
R, 4 , 65 ,10
1793,975,898.,
R, 5 , 65 ,10
1370,787,898.,
R, 6 , 65 ,10
1575,788,898.,
R, 7 , 65 ,10
1727,781,898.,
R, 8 , 65 ,10
1826,841,898.,
D, 4.5
1 ,ALL
D, 4.5
2 ,ALL
D, 4.5
4 ,ALL
D, 4.5
5 ,ALL
K,-5
1 ,ALL
K,-5
2 ,ALL
K,-5
4 ,ALL
K,-5
5 ,ALL
C,C
SOUND32 - RELEASE 07/30/91
TITLE:
TERRANO II THIRD LEVEL UNMITIGATED
REC REC ID DNL PEOPLE LEQ(CAL)
--------------------------------
1 R-1 65. 10. 65.2
2 R-2 65. 10. 64.6
3 R-3 65. 10. 64.1
4 R-4 65. 10. 64.3
5 R-5 65. 10. 68.5
6 R-6 65. 10. 68.5
7 R-7 65. 10. 69.0
8 R-8 65. 10. 67.2
--------------------------------
42428 Chisolm Trail, Murrieta CA 92562 phone 760-473-1253 www.ldnconsulting.net fax 760-689-4943
1/31/2023 22-161 Terrano II HRA 1
January 31, 2023
Matt McKinlay
Rexco Development
1285 Corona Pointe Court Suite 102
Corona, CA 92879
RE: Terrano II Multi-Family Development at Dos Lagos Health Risk - City of Corona The purpose of this Air Quality Heath Risk screening letter is to identify potential health risks at the proposed project site from toxic air contaminants (TACs) originating from Interstate-15 (I15). The proposed Project consists of developing a 50-unit apartment complex within the Dos Lagos Specific Plan. The project site is located within the City of Corona, CA.
This health risk analysis uses the California Office of Environmental Health Hazard Assessment (OEHHA) methodologies (Office of Environmental Health Hazard Assessment, 2015) as outlined by the California Air Pollution Control Officers Association (CAPCOA, July 2009).
Health risk impacts can exist when a project is exposed to toxic emissions and have the potential to impact nearby receptor. Sensitive receptors (and the facilities that house them) in proximity to sources of air pollutants that emit TACs are of particular concern. Exposure to TACs can increase the risk of contracting cancer or result in adverse non-cancer health effects. Non-cancer health risks associated with TAC exposure include birth defects and other reproductive damage, neurological disorders, and damage to the respiratory system (California Air Resources Board, 2005).
Generally, cancer risk can exist within 500-feet of a freeway or busy traffic corridor, but the risk will drop off with distance from a ground level pollution source. Freeways and busy traffic corridors are defined as traffic volume of over 100,000 vehicles per day in urban areas and 50,000 vehicles per day in rural areas (Education Code Section 17312). CARB studies show that air pollution levels can be significantly higher within 500 feet (150 meters) of freeways or busy traffic corridors (SCAQMD, 2005). Generally, in Riverside County, this is applied to education facilities however, it’s reasonable to assess impacts for residential uses as well.
The City of Corona is generally regulated by South Coast Air Quality Management District (SCAQMD). Under SCAQMD guidance, excess cancer risk significance threshold is set at 10 in a million (SCAQMD, 2015).
Matt McKinlay
Rexco Development
1285 Corona Pointe Court Suite 102
Corona, CA 92879
42428 Chisolm Trail, Murrieta CA 92562
phone 760-473-1253
Fax 760-689-4943
1/31/2023 2 22-161 Terrano II HRA
Cancer risk calculations are often presented on a 9, 30 or 70 year lifetime exposure duration.
The 9 year exposure scenario is based on exposure to children during the first 9 years of life.
Some districts use the 9 year exposure scenario to model short term projects. (CAPCOA, July 2009). For purposes of this analysis, it is reasonable to assume a 30 year duration. For purposes of modeling, AERMOD was used for air quality dispersion modeling and is the preferred/recommended U.S. Environmental Protection Agency (EPA) model for roadway modeling. The software has the ability to incorporate meteorological inputs as well as multiple source and receptor locations and is now used throughout the world. The model input/output is shown in Attachment A to this letter.
The project is adjacent to I-15 north of Dos Lagos Drive and south of Cajalco Road. According to Caltrans, the peak hour traffic is 11,400 trips and the average daily trips are 164,000 ADT (CALTRANS, 2013 Traffic Volumes on California State Highways, 2013). The EMFAC 2021 model was used to develop specific emissions rates for the ADT on the section modeled with AERMOD which was run for the 2025 scenario and is shown in Attachment B to this report. The County wide daily VMT from EMFAC was used to develop normalization factors to calculate ADTs by vehicle type (diesel specific) for the I-15 section analyzed which was ultimately used to derive the total diesel particulates in grams/day generated within the I-15 section analyzed. The emissions were then converted to grams/second which was utilized within AERMOD using a series of adjacent volume sources.
Modeling at the site included coordinates for I-15 and five receptor points which were selected from points on the project site (Receptors 1-5) and represent facility facades. The modeled locations are shown in Figure 1.
Based on discussions with the project applicant, all residential homes constructed as part of this project will have mechanical ventilation filtration systems consistent with the latest building codes such as California’s Title 24. Typical indoor air filtration systems used within todays heating and ventilation systems within California and consistent with Title 24 have a Minimum Efficiency Reporting Value (MERV) rating of 13 (California Energy Commission, 2019).
The US Environmental Protection Agency indicates that MERV 13 filtration systems reduce particulates between 1 and 3 microns by 85% and particles less than 10 microns (PM10) by 90% relative to outdoor ambient air (EPA, 2021).
The annual diesel particulate concentrations at the modeled receptors are summarized below in Table 1 and include the expected reductions within the interior of all residential structures which would have a minimum air filtration system of MERV 13. The modeled output emissions output curves from AERMOD are also shown in Figure 1 below.
Matt McKinlay
Rexco Development
1285 Corona Pointe Court Suite 102
Corona, CA 92879
42428 Chisolm Trail, Murrieta CA 92562
phone 760-473-1253
Fax 760-689-4943
1/31/2023 3 22-161 Terrano II HRA
Figure 1: AERMOD Emissions and Graphical Representation
1 2
3 4
5 AERMOD Volume Sources for Roadway
Each point on each color contour within
this figure represents locations having
emission concentrations equal to the
corresponding scale.
Matt McKinlay
Rexco Development
1285 Corona Pointe Court Suite 102
Corona, CA 92879
42428 Chisolm Trail, Murrieta CA 92562
phone 760-473-1253
Fax 760-689-4943
1/31/2023 4 22-161 Terrano II HRA
The annual diesel particulate concentrations at the modeled receptors are summarized below in Table 1 and include the expected reductions within the interior of all residential structures which would have a minimum air filtration system of MERV 13.
Table 1: Annual DPM Concentrations at each Receptor
Discreet Receptor AERMOD Name Concentration (μg/m3)
REC 1 0.01735
REC 2 0.01881
REC 3 0.02014
REC 4 0.02142
REC 5 0.02179
Once the dispersed concentrations of diesel particulates are estimated in the surrounding air, they are used to evaluate estimated exposure to people. Cancer Risk Exposure is evaluated by calculating the dose in milligrams per kilogram body weight per day (mg/kg/d). For residential exposure, the breathing rates are determined for specific age groups, so inhalation dose (Doseair) is calculated for each of these age groups, 3rd trimester, 0<2, 2<9, 2<16, 16<30 and 16- 70 years. The following algorithms calculate this dose for exposure through the inhalation pathways. The worst case cancer risk dose calculation is defined in Equation 1 below (OEHHA, 2015):
Equation 1 Doseair=Cair*(BR/BW)*A*EF*(1x10-6 )
Doseair = Dose through inhalation (mg/kg/d)
Cair =
Concentration in air (μg/m3) Annual average DPM concentration in µg/m3 – AERMOD
BR/BW = Daily average breathing rates normalized to body weight (L/kg BW-day).
A = Inhalation absorption factor (assumed to be 1)
EF = Exposure frequency (unitless, days/365 days)
1x10-6 = Milligrams to micrograms conversion (10-3 mg/ μg), cubic meters to liters conversion (10-3 m3/l)
Once the dose is determined then you must calculate the cancer risk. The average daily inhalation dose (mg/kg-day) multiplied by the cancer potency factor (mg/kg-day)-1 will give the inhalation cancer risk (unitless), which is an expression of the chemical’s cancer risk during exposure. For example, an inhalation cancer risk of 5 x 10-6 is the same as stating that an Matt McKinlay
Rexco Development
1285 Corona Pointe Court Suite 102
Corona, CA 92879
42428 Chisolm Trail, Murrieta CA 92562
phone 760-473-1253
Fax 760-689-4943
1/31/2023 5 22-161 Terrano II HRA
individual has an estimated probability of developing cancer from their exposure of 5 chances per million people exposed.
Cancer risk is calculated by multiplying the daily inhalation or oral dose, by a cancer potency factor, the age sensitivity factor, the frequency of time spent at home and the exposure duration divided by averaging time, to yield the excess cancer risk. As described below, the excess cancer risk is calculated separately for each age grouping and then summed to yield cancer risk for any given location. The worst-case cancer risk calculation is defined in Equation 2 below (OEHHA, 2015).
Equation 2 RISKinh-res=DOSEair × CPF × ASF × ED/AT × FAH RISKinh-res = Residential inhalation cancer risk
DOSEair = Daily inhalation dose (mg/kg-day)
CPF = Inhalation cancer potency factor (mg/kg-day
-1
)
ASF = Age sensitivity factor for a specified age group (unitless) ED = Exposure duration (in years) for a specified age group AT = Averaging time for lifetime cancer risk (years)
FAH = Fraction of time spent at home (unitless)
The results of the cancer risk calculations are shown in Table 2 below. The detailed model input/output is also provided as Attachment C to this report. Based on these calculations, cancer risks from DPM generated from SR-125 would not exceed the 10 per one million exposed thresholds within any units constructed within the Otay Village 8 area.
Table 2: Cancer Risk at Worst-Case Indoor Receptors (MERV 8 Design Feature) Receptor Ci
Unmitigated Cancer Risk
(30 Years) Potential Impact
REC 1 0.01735 7.19 No
REC 2 0.01881 7.80 No
REC 3 0.02014 8.35 No
REC 4 0.02142 8.88 No
REC 5 0.02179 9.03 No
Ci annual inputs from AERMOD within prospective building.
Cancer Risk = DOSEair × CPF × ASF × ED/AT × FAH
Matt McKinlay
Rexco Development
1285 Corona Pointe Court Suite 102
Corona, CA 92879
42428 Chisolm Trail, Murrieta CA 92562
phone 760-473-1253
Fax 760-689-4943
1/31/2023 6 22-161 Terrano II HRA
It is important to note that this assessment serves simply as a disclosure document to providing a characterization of the background emissions that occupants of the proposed project may be exposed to. If you should have any questions regarding this assessment, please do not hesitate to contact me at (760) 473-1253.
Sincerely,
Ldn Consulting, Inc.
Jeremy Louden
Attachments:
A: AERMOD
B: EMFAC 2021 Emission Factors – 2025
C: Cancer Risk Calculations – Indoor
References:
California Air Resources Board. (2005). AIR QUALITY AND LAND USE HANDBOOK. Retrieved 2016, from http://www.arb.ca.gov/ch/handbook.pdf
California Energy Commission. (2019). 2019 Building Energy Efficiency Standards - What’s New for Residential. Retrieved from
https://www.energy.ca.gov/sites/default/files/2020-
03/Title_24_2019_Residential_WhatsNew_ada.pdf
CALTRANS. (2013). 2013 Traffic Volumes on California State Highways. Retrieved 2015, from http://www.dot.ca.gov/hq/traffops/saferesr/trafdata/docs/2013_aadt_volumes.pdf CAPCOA. (July 2009). Health Risk Assessment for Proposed Land Use Projects. California Air Pollution Control Officers Association .
EPA. (2021). What is a MERV rating? United States. Retrieved from https://www.epa.gov/indoor-air-quality-iaq/what-merv-rating Matt McKinlay
Rexco Development
1285 Corona Pointe Court Suite 102
Corona, CA 92879
42428 Chisolm Trail, Murrieta CA 92562
phone 760-473-1253
Fax 760-689-4943
1/31/2023 7 22-161 Terrano II HRA
OEHHA. (2015). Risk Assessment Guidelines - Guidance Manual for Preparation of Health Risk Assessments. OEHHHA. Retrieved from
http://oehha.ca.gov/air/hot_spots/2015/2015GuidanceManual.pdf Office of Environmental Health Hazard Assessment. (2015). Hot Spot Guidlines. Retrieved April 16, 2015, from http://www.oehha.ca.gov/air/hot_spots/index.html SCAQMD. (2005, May 6). Guidance Document for Addressing Air Quality Issues in General Plans and Local Planning. Riverside, CA. Retrieved from http://www.aqmd.gov/docs/default-source/planning/air-quality-guidance/chapter-2--- air-quality-issues-regarding-land-use.pdf?sfvrsn=2
SCAQMD. (2015, March). SCAQMD Air Quality Significance Thresholds. Retrieved from http://www.aqmd.gov/docs/default-source/ceqa/handbook/scaqmd-air-qualitysignificance-thresholds.pdf?sfvrsn=2 AERMOD PRIME ‐ (DATED 19191)
AERMODPrMSPx VERSION
(C) COPYRIGHT 1998‐2017, Trinity Consultants
Run Began on 1/28/2023 at 12:12:49
** BREEZE AERMOD
** Trinity Consultants
** VERSION 10.0
CO STARTING
CO TITLEONE I15 Roadway Emissions
CO MODELOPT DFAULT CONC NODRYDPLT NOWETDPLT
CO RUNORNOT RUN
CO AVERTIME ANNUAL
CO POLLUTID PM10
CO FINISHED
SO STARTING
SO ELEVUNIT METERS
SO LOCATION ASNLR058 VOLUME 452857.3 3741276.7 0 ** SRCDESCR Interstate 15
SO LOCATION ASNLR059 VOLUME 452866.1 3741256.5 0 ** SRCDESCR Interstate 15
SO LOCATION ASNLR05A VOLUME 452874.9 3741236.4 0 ** SRCDESCR Interstate 15
SO LOCATION ASNLR05B VOLUME 452883.6 3741216.2 0 ** SRCDESCR Interstate 15
SO LOCATION ASNLR05C VOLUME 452892.4 3741196.0 0 ** SRCDESCR Interstate 15
SO LOCATION ASNLR05D VOLUME 452901.2 3741175.9 0 ** SRCDESCR Interstate 15
SO LOCATION ASNLR05E VOLUME 452910.0 3741155.7 0 ** SRCDESCR Interstate 15
SO LOCATION ASNLR05F VOLUME 452918.8 3741135.5 0 ** SRCDESCR Interstate 15
SO LOCATION ASNLR05G VOLUME 452927.5 3741115.3 0 ** SRCDESCR Interstate 15
SO LOCATION ASNLR05H VOLUME 452936.3 3741095.2 0 ** SRCDESCR Interstate 15
SO LOCATION ASNLR05I VOLUME 452945.1 3741075.0 0 ** SRCDESCR Interstate 15
SO LOCATION ASNLR05J VOLUME 452953.9 3741054.8 0 ** SRCDESCR Interstate 15
SO LOCATION ASNLR05K VOLUME 452962.7 3741034.7 0 ** SRCDESCR Interstate 15
SO LOCATION ASNLR05L VOLUME 452971.4 3741014.5 0 ** SRCDESCR Interstate 15
SO LOCATION ASNLR05M VOLUME 452980.2 3740994.3 0 ** SRCDESCR Interstate 15
SO LOCATION ASNLR05N VOLUME 452989.0 3740974.1 0 ** SRCDESCR Interstate 15
SO LOCATION ASNLR05O VOLUME 452997.8 3740954.0 0 ** SRCDESCR Interstate 15
SO LOCATION ASNLR05P VOLUME 453006.6 3740933.8 0 ** SRCDESCR Interstate 15
SO LOCATION ASNLR05Q VOLUME 453015.4 3740913.6 0 ** SRCDESCR Interstate 15
SO LOCATION ASNLR05R VOLUME 453024.1 3740893.5 0 ** SRCDESCR Interstate 15
SO LOCATION ASNLR05S VOLUME 453032.9 3740873.3 0 ** SRCDESCR Interstate 15
SO LOCATION ASNLR05T VOLUME 453041.7 3740853.1 0 ** SRCDESCR Interstate 15
SO LOCATION ASNLR05U VOLUME 453050.5 3740832.9 0 ** SRCDESCR Interstate 15
SO LOCATION ASNLR05V VOLUME 453059.3 3740812.8 0 ** SRCDESCR Interstate 15
SO LOCATION ASNLR05W VOLUME 453068.0 3740792.6 0 ** SRCDESCR Interstate 15
SO LOCATION ASNLR05X VOLUME 453076.8 3740772.4 0 ** SRCDESCR Interstate 15
SO LOCATION ASNLR05Y VOLUME 453085.6 3740752.3 0 ** SRCDESCR Interstate 15
SO LOCATION ASNLR05Z VOLUME 453094.4 3740732.1 0 ** SRCDESCR Interstate 15
SO LOCATION ASNLR060 VOLUME 453103.2 3740711.9 0 ** SRCDESCR Interstate 15
SO LOCATION ASNLR061 VOLUME 453112.0 3740691.7 0 ** SRCDESCR Interstate 15
SO LOCATION ASNLR062 VOLUME 453120.7 3740671.6 0 ** SRCDESCR Interstate 15
SO LOCATION ASNLR063 VOLUME 453129.5 3740651.4 0 ** SRCDESCR Interstate 15
SO LOCATION ASNLR064 VOLUME 453138.3 3740631.2 0 ** SRCDESCR Interstate 15
SO LOCATION ASNLR065 VOLUME 453147.1 3740611.1 0 ** SRCDESCR Interstate 15
SO LOCATION ASNLR066 VOLUME 453155.9 3740590.9 0 ** SRCDESCR Interstate 15
SO SRCPARAM ASNLR058 1.12154E‐05 3 10.23256 2.790698 SO SRCPARAM ASNLR059 1.12154E‐05 3 10.23256 2.790698 SO SRCPARAM ASNLR05A 1.12154E‐05 3 10.23256 2.790698 SO SRCPARAM ASNLR05B 1.12154E‐05 3 10.23256 2.790698 SO SRCPARAM ASNLR05C 1.12154E‐05 3 10.23256 2.790698 SO SRCPARAM ASNLR05D 1.12154E‐05 3 10.23256 2.790698 SO SRCPARAM ASNLR05E 1.12154E‐05 3 10.23256 2.790698 SO SRCPARAM ASNLR05F 1.12154E‐05 3 10.23256 2.790698 SO SRCPARAM ASNLR05G 1.12154E‐05 3 10.23256 2.790698 SO SRCPARAM ASNLR05H 1.12154E‐05 3 10.23256 2.790698 SO SRCPARAM ASNLR05I 1.12154E‐05 3 10.23256 2.790698 SO SRCPARAM ASNLR05J 1.12154E‐05 3 10.23256 2.790698 SO SRCPARAM ASNLR05K 1.12154E‐05 3 10.23256 2.790698 SO SRCPARAM ASNLR05L 1.12154E‐05 3 10.23256 2.790698 SO SRCPARAM ASNLR05M 1.12154E‐05 3 10.23256 2.790698 SO SRCPARAM ASNLR05N 1.12154E‐05 3 10.23256 2.790698 SO SRCPARAM ASNLR05O 1.12154E‐05 3 10.23256 2.790698 SO SRCPARAM ASNLR05P 1.12154E‐05 3 10.23256 2.790698 SO SRCPARAM ASNLR05Q 1.12154E‐05 3 10.23256 2.790698 SO SRCPARAM ASNLR05R 1.12154E‐05 3 10.23256 2.790698 SO SRCPARAM ASNLR05S 1.12154E‐05 3 10.23256 2.790698 SO SRCPARAM ASNLR05T 1.12154E‐05 3 10.23256 2.790698 SO SRCPARAM ASNLR05U 1.12154E‐05 3 10.23256 2.790698 SO SRCPARAM ASNLR05V 1.12154E‐05 3 10.23256 2.790698 SO SRCPARAM ASNLR05W 1.12154E‐05 3 10.23256 2.790698 SO SRCPARAM ASNLR05X 1.12154E‐05 3 10.23256 2.790698 SO SRCPARAM ASNLR05Y 1.12154E‐05 3 10.23256 2.790698 SO SRCPARAM ASNLR05Z 1.12154E‐05 3 10.23256 2.790698 SO SRCPARAM ASNLR060 1.12154E‐05 3 10.23256 2.790698 SO SRCPARAM ASNLR061 1.12154E‐05 3 10.23256 2.790698 SO SRCPARAM ASNLR062 1.12154E‐05 3 10.23256 2.790698 SO SRCPARAM ASNLR063 1.12154E‐05 3 10.23256 2.790698 SO SRCPARAM ASNLR064 1.12154E‐05 3 10.23256 2.790698 SO SRCPARAM ASNLR065 1.12154E‐05 3 10.23256 2.790698 SO SRCPARAM ASNLR066 1.12154E‐05 3 10.23256 2.790698 SO SRCGROUP ALL
SO FINISHED
RE STARTING
RE ELEVUNIT METERS
RE GRIDCART ASNLR069 STA
RE GRIDCART ASNLR069 XYINC 452879.3 21 31.835 3741338.6 21 ‐34.09 RE GRIDCART ASNLR069 ELEV 1 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 RE GRIDCART ASNLR069 ELEV 1 1.5 1.5 1.5 1.5 1.5 1.5 RE GRIDCART ASNLR069 ELEV 2 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 RE GRIDCART ASNLR069 ELEV 2 1.5 1.5 1.5 1.5 1.5 1.5 RE GRIDCART ASNLR069 ELEV 3 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 RE GRIDCART ASNLR069 ELEV 3 1.5 1.5 1.5 1.5 1.5 1.5 RE GRIDCART ASNLR069 ELEV 4 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 RE GRIDCART ASNLR069 ELEV 4 1.5 1.5 1.5 1.5 1.5 1.5 RE GRIDCART ASNLR069 ELEV 5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 RE GRIDCART ASNLR069 ELEV 5 1.5 1.5 1.5 1.5 1.5 1.5 RE GRIDCART ASNLR069 ELEV 6 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 RE GRIDCART ASNLR069 ELEV 6 1.5 1.5 1.5 1.5 1.5 1.5 RE GRIDCART ASNLR069 ELEV 7 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 RE GRIDCART ASNLR069 ELEV 7 1.5 1.5 1.5 1.5 1.5 1.5 RE GRIDCART ASNLR069 ELEV 8 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 RE GRIDCART ASNLR069 ELEV 8 1.5 1.5 1.5 1.5 1.5 1.5 RE GRIDCART ASNLR069 ELEV 9 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 RE GRIDCART ASNLR069 ELEV 9 1.5 1.5 1.5 1.5 1.5 1.5 RE GRIDCART ASNLR069 ELEV 10 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 RE GRIDCART ASNLR069 ELEV 10 1.5 1.5 1.5 1.5 1.5 1.5 RE GRIDCART ASNLR069 ELEV 11 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 RE GRIDCART ASNLR069 ELEV 11 1.5 1.5 1.5 1.5 1.5 1.5 RE GRIDCART ASNLR069 ELEV 12 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 RE GRIDCART ASNLR069 ELEV 12 1.5 1.5 1.5 1.5 1.5 1.5 RE GRIDCART ASNLR069 ELEV 13 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 RE GRIDCART ASNLR069 ELEV 13 1.5 1.5 1.5 1.5 1.5 1.5 RE GRIDCART ASNLR069 ELEV 14 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 RE GRIDCART ASNLR069 ELEV 14 1.5 1.5 1.5 1.5 1.5 1.5 RE GRIDCART ASNLR069 ELEV 15 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 RE GRIDCART ASNLR069 ELEV 15 1.5 1.5 1.5 1.5 1.5 1.5 RE GRIDCART ASNLR069 ELEV 16 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 RE GRIDCART ASNLR069 ELEV 16 1.5 1.5 1.5 1.5 1.5 1.5 RE GRIDCART ASNLR069 ELEV 17 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 RE GRIDCART ASNLR069 ELEV 17 1.5 1.5 1.5 1.5 1.5 1.5 RE GRIDCART ASNLR069 ELEV 18 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 RE GRIDCART ASNLR069 ELEV 18 1.5 1.5 1.5 1.5 1.5 1.5 RE GRIDCART ASNLR069 ELEV 19 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 RE GRIDCART ASNLR069 ELEV 19 1.5 1.5 1.5 1.5 1.5 1.5 RE GRIDCART ASNLR069 ELEV 20 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 RE GRIDCART ASNLR069 ELEV 20 1.5 1.5 1.5 1.5 1.5 1.5 RE GRIDCART ASNLR069 ELEV 21 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 RE GRIDCART ASNLR069 ELEV 21 1.5 1.5 1.5 1.5 1.5 1.5 RE GRIDCART ASNLR069 HILL 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 RE GRIDCART ASNLR069 HILL 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 RE GRIDCART ASNLR069 HILL 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 RE GRIDCART ASNLR069 HILL 4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 RE GRIDCART ASNLR069 HILL 5 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 RE GRIDCART ASNLR069 HILL 6 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 RE GRIDCART ASNLR069 HILL 7 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 RE GRIDCART ASNLR069 HILL 8 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 RE GRIDCART ASNLR069 HILL 9 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 RE GRIDCART ASNLR069 HILL 10 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 RE GRIDCART ASNLR069 HILL 11 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 RE GRIDCART ASNLR069 HILL 12 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 RE GRIDCART ASNLR069 HILL 13 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 RE GRIDCART ASNLR069 HILL 14 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 RE GRIDCART ASNLR069 HILL 15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 RE GRIDCART ASNLR069 HILL 16 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 RE GRIDCART ASNLR069 HILL 17 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 RE GRIDCART ASNLR069 HILL 18 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 RE GRIDCART ASNLR069 HILL 19 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 RE GRIDCART ASNLR069 HILL 20 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 RE GRIDCART ASNLR069 HILL 21 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 RE GRIDCART ASNLR069 END
RE DISCCART 453204.6 3741198.2 0 0
** SENSITIV
** RCPDESCR REC1
RE DISCCART 453204.6 3741161.8 0 0
** SENSITIV
** RCPDESCR REC2
RE DISCCART 453215.1 3741112.8 0 0
** SENSITIV
** RCPDESCR REC3
RE DISCCART 453221.2 3741072.1 0 0
** SENSITIV
** RCPDESCR REC4
RE DISCCART 453223.4 3741059.4 0 0
** SENSITIV
** RCPDESCR REC5
RE FINISHED
ME STARTING
ME SURFFILE "C:\USERS\RYAN\ONEDRIVE\LDNONE~1\CI9EA3~1\22‐161~1\HRA\SUBMIT~1\BREEZE~1\ELSI8.SFC" ** SURFFILE "C:\USERS\RYAN\ONEDRIVE\LDNONE~1\CI9EA3~1\22‐161~1\HRA\SUBMIT~1\BREEZE~1\ELSI8.SFC" ME PROFFILE "C:\USERS\RYAN\ONEDRIVE\LDNONE~1\CI9EA3~1\22‐161~1\HRA\SUBMIT~1\BREEZE~1\ELSI8.PFL" ** PROFFILE "C:\USERS\RYAN\ONEDRIVE\LDNONE~1\CI9EA3~1\22‐161~1\HRA\SUBMIT~1\BREEZE~1\ELSI8.PFL" ME SURFDATA 0 2008
ME UAIRDATA 3190 2008
ME PROFBASE 3 METERS
ME STARTEND 2011 1 1 1 2012 12 31 24
ME FINISHED
OU STARTING
OU FILEFORM FIX
OU PLOTFILE ANNUAL ALL ALL`ANNUAL.plt 10000
OU FINISHED
** ***************************************************************************** ** It is recommended that the user not edit any data below this line ** ***************************************************************************** ** TAG NAM ASNLR057
** TAG PRM 0 2 F F 1 255,0,0,0
** TAG CRD 452852.9,3741286.8,0,453163.6,3740573.1,0 ** AMPTYPE
** AMPDATUM ‐1
** AMPZONE ‐1
** AMPHEMISPHERE
** PROJECTIONWKT
PROJCS["UTM_4326_Zone11",GEOGCS["WGS_84",DATUM["World_Geodetic_System_1984",SPHEROID["WGS_1984",6378137,298.2572235 63],TOWGS84[0,0,0,0,0,0,0]],PRIMEM["Greenwich",0],UNIT["Degree",0.0174532925199433]],PROJECTION["Universal_Transver se_Mercator"],PARAMETER["Zone",11],UNIT["Meter",1,AUTHORITY["EPSG","9001"]]] ** PROJECTION UTM
** DATUM WGE
** UNITS METER
** ZONE 11
** HEMISPHERE N
** ORIGINLON 0
** ORIGINLAT 0
** PARALLEL1 0
** PARALLEL2 0
** AZIMUTH 0
** SCALEFACT 0
** FALSEEAST 0
** FALSENORTH 0
** POSTFMT UNFORM
** TEMPLATE UserDefined
** AERMODEXE AERMOD_BREEZE_19191_64.EXE
** AERMAPEXE AERMAP_EPA_11103.EXE
***********************************
*** SETUP Finishes Successfully ***
***********************************
*** AERMOD ‐ VERSION 19191 *** *** I15 Roadway Emissions *** 01/28/23
*** AERMET ‐ VERSION 14134 *** *** *** 12:12:49
PAGE 1
*** MODELOPTs: RegDFAULT CONC ELEV NODRYDPLT NOWETDPLT RURAL *** MODEL SETUP OPTIONS SUMMARY ***
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
**Model Is Setup For Calculation of Average CONCentration Values.
‐‐ DEPOSITION LOGIC ‐‐
**NO GAS DEPOSITION Data Provided.
**NO PARTICLE DEPOSITION Data Provided.
**Model Uses NO DRY DEPLETION. DRYDPLT = F
**Model Uses NO WET DEPLETION. WETDPLT = F
**Model Uses RURAL Dispersion Only.
**Model Uses Regulatory DEFAULT Options:
1. Stack‐tip Downwash.
2. Model Accounts for ELEVated Terrain Effects.
3. Use Calms Processing Routine.
4. Use Missing Data Processing Routine.
5. No Exponential Decay.
**Other Options Specified:
TEMP_Sub ‐ Meteorological data includes TEMP substitutions
**Model Assumes No FLAGPOLE Receptor Heights.
**The User Specified a Pollutant Type of: PM10
**Model Calculates ANNUAL Averages Only
**This Run Includes: 35 Source(s); 1 Source Group(s); and 446 Receptor(s) with: 0 POINT(s), including
0 POINTCAP(s) and 0 POINTHOR(s)
and: 35 VOLUME source(s)
and: 0 AREA type source(s)
and: 0 LINE source(s)
and: 0 RLINE/RLINEXT source(s)
and: 0 OPENPIT source(s)
and: 0 BUOYANT LINE source(s) with 0 line(s)
**Model Set To Continue RUNning After the Setup Testing. **The AERMET Input Meteorological Data Version Date: 14134
**Output Options Selected:
Model Outputs Tables of ANNUAL Averages by Receptor
Model Outputs External File(s) of High Values for Plotting (PLOTFILE Keyword)
**NOTE: The Following Flags May Appear Following CONC Values: c for Calm Hours m for Missing Hours
b for Both Calm and Missing Hours
**Misc. Inputs: Base Elev. for Pot. Temp. Profile (m MSL) = 3.00 ; Decay Coef. = 0.000 ; Rot. Angle = 0.0
Emission Units = GRAMS/SEC ; Emission Rate Unit Factor =
0.10000E+07
Output Units = MICROGRAMS/M**3
**Approximate Storage Requirements of Model = 3.6 MB of RAM.
**Input Runstream File: aermod.inp
**Output Print File: aermod.out
*** AERMOD ‐ VERSION 19191 *** *** I15 Roadway Emissions *** 01/28/23
*** AERMET ‐ VERSION 14134 *** *** *** 12:12:49
PAGE 2
*** MODELOPTs: RegDFAULT CONC ELEV NODRYDPLT NOWETDPLT RURAL *** VOLUME SOURCE DATA ***
NUMBER EMISSION RATE BASE RELEASE INIT. INIT. URBAN EMISSION RATE SOURCE PART. (GRAMS/SEC) X Y ELEV. HEIGHT SY SZ SOURCE SCALAR VARY ID CATS. (METERS) (METERS) (METERS) (METERS) (METERS) (METERS) BY ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
ASNLR058 0 0.11215E‐04 452857.3 3741276.7 0.0 3.00 10.23 2.79 NO ASNLR059 0 0.11215E‐04 452866.1 3741256.5 0.0 3.00 10.23 2.79 NO ASNLR05A 0 0.11215E‐04 452874.9 3741236.4 0.0 3.00 10.23 2.79 NO ASNLR05B 0 0.11215E‐04 452883.6 3741216.2 0.0 3.00 10.23 2.79 NO ASNLR05C 0 0.11215E‐04 452892.4 3741196.0 0.0 3.00 10.23 2.79 NO ASNLR05D 0 0.11215E‐04 452901.2 3741175.9 0.0 3.00 10.23 2.79 NO ASNLR05E 0 0.11215E‐04 452910.0 3741155.7 0.0 3.00 10.23 2.79 NO ASNLR05F 0 0.11215E‐04 452918.8 3741135.5 0.0 3.00 10.23 2.79 NO ASNLR05G 0 0.11215E‐04 452927.5 3741115.3 0.0 3.00 10.23 2.79 NO ASNLR05H 0 0.11215E‐04 452936.3 3741095.2 0.0 3.00 10.23 2.79 NO ASNLR05I 0 0.11215E‐04 452945.1 3741075.0 0.0 3.00 10.23 2.79 NO ASNLR05J 0 0.11215E‐04 452953.9 3741054.8 0.0 3.00 10.23 2.79 NO ASNLR05K 0 0.11215E‐04 452962.7 3741034.7 0.0 3.00 10.23 2.79 NO ASNLR05L 0 0.11215E‐04 452971.4 3741014.5 0.0 3.00 10.23 2.79 NO ASNLR05M 0 0.11215E‐04 452980.2 3740994.3 0.0 3.00 10.23 2.79 NO ASNLR05N 0 0.11215E‐04 452989.0 3740974.1 0.0 3.00 10.23 2.79 NO ASNLR05O 0 0.11215E‐04 452997.8 3740954.0 0.0 3.00 10.23 2.79 NO ASNLR05P 0 0.11215E‐04 453006.6 3740933.8 0.0 3.00 10.23 2.79 NO ASNLR05Q 0 0.11215E‐04 453015.4 3740913.6 0.0 3.00 10.23 2.79 NO ASNLR05R 0 0.11215E‐04 453024.1 3740893.5 0.0 3.00 10.23 2.79 NO ASNLR05S 0 0.11215E‐04 453032.9 3740873.3 0.0 3.00 10.23 2.79 NO ASNLR05T 0 0.11215E‐04 453041.7 3740853.1 0.0 3.00 10.23 2.79 NO ASNLR05U 0 0.11215E‐04 453050.5 3740832.9 0.0 3.00 10.23 2.79 NO ASNLR05V 0 0.11215E‐04 453059.3 3740812.8 0.0 3.00 10.23 2.79 NO ASNLR05W 0 0.11215E‐04 453068.0 3740792.6 0.0 3.00 10.23 2.79 NO ASNLR05X 0 0.11215E‐04 453076.8 3740772.4 0.0 3.00 10.23 2.79 NO ASNLR05Y 0 0.11215E‐04 453085.6 3740752.3 0.0 3.00 10.23 2.79 NO ASNLR05Z 0 0.11215E‐04 453094.4 3740732.1 0.0 3.00 10.23 2.79 NO ASNLR060 0 0.11215E‐04 453103.2 3740711.9 0.0 3.00 10.23 2.79 NO ASNLR061 0 0.11215E‐04 453112.0 3740691.7 0.0 3.00 10.23 2.79 NO ASNLR062 0 0.11215E‐04 453120.7 3740671.6 0.0 3.00 10.23 2.79 NO ASNLR063 0 0.11215E‐04 453129.5 3740651.4 0.0 3.00 10.23 2.79 NO ASNLR064 0 0.11215E‐04 453138.3 3740631.2 0.0 3.00 10.23 2.79 NO ASNLR065 0 0.11215E‐04 453147.1 3740611.1 0.0 3.00 10.23 2.79 NO ASNLR066 0 0.11215E‐04 453155.9 3740590.9 0.0 3.00 10.23 2.79 NO
*** AERMOD ‐ VERSION 19191 *** *** I15 Roadway Emissions *** 01/28/23
*** AERMET ‐ VERSION 14134 *** *** *** 12:12:49
PAGE 3
*** MODELOPTs: RegDFAULT CONC ELEV NODRYDPLT NOWETDPLT RURAL *** SOURCE IDs DEFINING SOURCE GROUPS ***
SRCGROUP ID SOURCE IDs ‐‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐ ALL ASNLR058 , ASNLR059 , ASNLR05A , ASNLR05B , ASNLR05C , ASNLR05D , ASNLR05E , ASNLR05F ,
ASNLR05G , ASNLR05H , ASNLR05I , ASNLR05J , ASNLR05K , ASNLR05L , ASNLR05M , ASNLR05N ,
ASNLR05O , ASNLR05P , ASNLR05Q , ASNLR05R , ASNLR05S , ASNLR05T , ASNLR05U , ASNLR05V ,
ASNLR05W , ASNLR05X , ASNLR05Y , ASNLR05Z , ASNLR060 , ASNLR061 , ASNLR062 , ASNLR063 ,
ASNLR064 , ASNLR065 , ASNLR066 ,
*** AERMOD ‐ VERSION 19191 *** *** I15 Roadway Emissions *** 01/28/23
*** AERMET ‐ VERSION 14134 *** *** *** 12:12:49
PAGE 4
*** MODELOPTs: RegDFAULT CONC ELEV NODRYDPLT NOWETDPLT RURAL *** GRIDDED RECEPTOR NETWORK SUMMARY ***
*** NETWORK ID: ASNLR069 ; NETWORK TYPE: GRIDCART ***
*** X‐COORDINATES OF GRID ***
(METERS)
452879.3, 452911.1, 452943.0, 452974.8, 453006.6, 453038.5, 453070.3, 453102.1, 453134.0, 453165.8, 453197.6, 453229.5, 453261.3, 453293.2, 453325.0, 453356.8, 453388.7, 453420.5, 453452.3, 453484.2, 453516.0,
*** Y‐COORDINATES OF GRID ***
(METERS)
3741338.6, 3741304.5, 3741270.4, 3741236.3, 3741202.2, 3741168.1, 3741134.1, 3741100.0, 3741065.9, 3741031.8, 3740997.7, 3740963.6, 3740929.5, 3740895.4, 3740861.3, 3740827.2, 3740793.2, 3740759.1, 3740725.0, 3740690.9, 3740656.8,
*** AERMOD ‐ VERSION 19191 *** *** I15 Roadway Emissions *** 01/28/23
*** AERMET ‐ VERSION 14134 *** *** *** 12:12:49
PAGE 5
*** MODELOPTs: RegDFAULT CONC ELEV NODRYDPLT NOWETDPLT RURAL *** NETWORK ID: ASNLR069 ; NETWORK TYPE: GRIDCART ***
* ELEVATION HEIGHTS IN METERS *
Y‐COORD | X‐COORD (METERS) (METERS) | 452879.30 452911.14 452942.97 452974.80 453006.64 453038.47 453070.31 453102.14 453133.98
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
3740656.80 | 1.50 1.50 1.50 1.50 1.50 1.50 1.50
1.50 1.50
3740690.89 | 1.50 1.50 1.50 1.50 1.50 1.50 1.50
1.50 1.50
3740724.98 | 1.50 1.50 1.50 1.50 1.50 1.50 1.50
1.50 1.50
3740759.07 | 1.50 1.50 1.50 1.50 1.50 1.50 1.50
1.50 1.50
3740793.16 | 1.50 1.50 1.50 1.50 1.50 1.50 1.50
1.50 1.50
3740827.25 | 1.50 1.50 1.50 1.50 1.50 1.50 1.50
1.50 1.50
3740861.34 | 1.50 1.50 1.50 1.50 1.50 1.50 1.50
1.50 1.50
3740895.43 | 1.50 1.50 1.50 1.50 1.50 1.50 1.50
1.50 1.50
3740929.52 | 1.50 1.50 1.50 1.50 1.50 1.50 1.50
1.50 1.50
3740963.61 | 1.50 1.50 1.50 1.50 1.50 1.50 1.50
1.50 1.50
3740997.70 | 1.50 1.50 1.50 1.50 1.50 1.50 1.50
1.50 1.50
3741031.79 | 1.50 1.50 1.50 1.50 1.50 1.50 1.50
1.50 1.50
3741065.88 | 1.50 1.50 1.50 1.50 1.50 1.50 1.50
1.50 1.50
3741099.97 | 1.50 1.50 1.50 1.50 1.50 1.50 1.50
1.50 1.50
3741134.06 | 1.50 1.50 1.50 1.50 1.50 1.50 1.50
1.50 1.50
3741168.15 | 1.50 1.50 1.50 1.50 1.50 1.50 1.50
1.50 1.50
3741202.24 | 1.50 1.50 1.50 1.50 1.50 1.50 1.50
1.50 1.50
3741236.33 | 1.50 1.50 1.50 1.50 1.50 1.50 1.50
1.50 1.50
3741270.42 | 1.50 1.50 1.50 1.50 1.50 1.50 1.50
1.50 1.50
3741304.51 | 1.50 1.50 1.50 1.50 1.50 1.50 1.50
1.50 1.50
3741338.60 | 1.50 1.50 1.50 1.50 1.50 1.50 1.50
1.50 1.50
*** AERMOD ‐ VERSION 19191 *** *** I15 Roadway Emissions *** 01/28/23
*** AERMET ‐ VERSION 14134 *** *** *** 12:12:49
PAGE 6
*** MODELOPTs: RegDFAULT CONC ELEV NODRYDPLT NOWETDPLT RURAL *** NETWORK ID: ASNLR069 ; NETWORK TYPE: GRIDCART ***
* ELEVATION HEIGHTS IN METERS *
Y‐COORD | X‐COORD (METERS) (METERS) | 453165.82 453197.65 453229.48 453261.32 453293.15 453324.99 453356.83 453388.66 453420.49
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
3740656.80 | 1.50 1.50 1.50 1.50 1.50 1.50 1.50
1.50 1.50
3740690.89 | 1.50 1.50 1.50 1.50 1.50 1.50 1.50
1.50 1.50
3740724.98 | 1.50 1.50 1.50 1.50 1.50 1.50 1.50
1.50 1.50
3740759.07 | 1.50 1.50 1.50 1.50 1.50 1.50 1.50
1.50 1.50
3740793.16 | 1.50 1.50 1.50 1.50 1.50 1.50 1.50
1.50 1.50
3740827.25 | 1.50 1.50 1.50 1.50 1.50 1.50 1.50
1.50 1.50
3740861.34 | 1.50 1.50 1.50 1.50 1.50 1.50 1.50
1.50 1.50
3740895.43 | 1.50 1.50 1.50 1.50 1.50 1.50 1.50
1.50 1.50
3740929.52 | 1.50 1.50 1.50 1.50 1.50 1.50 1.50
1.50 1.50
3740963.61 | 1.50 1.50 1.50 1.50 1.50 1.50 1.50
1.50 1.50
3740997.70 | 1.50 1.50 1.50 1.50 1.50 1.50 1.50
1.50 1.50
3741031.79 | 1.50 1.50 1.50 1.50 1.50 1.50 1.50
1.50 1.50
3741065.88 | 1.50 1.50 1.50 1.50 1.50 1.50 1.50
1.50 1.50
3741099.97 | 1.50 1.50 1.50 1.50 1.50 1.50 1.50
1.50 1.50
3741134.06 | 1.50 1.50 1.50 1.50 1.50 1.50 1.50
1.50 1.50
3741168.15 | 1.50 1.50 1.50 1.50 1.50 1.50 1.50
1.50 1.50
3741202.24 | 1.50 1.50 1.50 1.50 1.50 1.50 1.50
1.50 1.50
3741236.33 | 1.50 1.50 1.50 1.50 1.50 1.50 1.50
1.50 1.50
3741270.42 | 1.50 1.50 1.50 1.50 1.50 1.50 1.50
1.50 1.50
3741304.51 | 1.50 1.50 1.50 1.50 1.50 1.50 1.50
1.50 1.50
3741338.60 | 1.50 1.50 1.50 1.50 1.50 1.50 1.50
1.50 1.50
*** AERMOD ‐ VERSION 19191 *** *** I15 Roadway Emissions *** 01/28/23
*** AERMET ‐ VERSION 14134 *** *** *** 12:12:49
PAGE 7
*** MODELOPTs: RegDFAULT CONC ELEV NODRYDPLT NOWETDPLT RURAL *** NETWORK ID: ASNLR069 ; NETWORK TYPE: GRIDCART ***
* ELEVATION HEIGHTS IN METERS *
Y‐COORD | X‐COORD (METERS) (METERS) | 453452.33 453484.16 453516.00
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
3740656.80 | 1.50 1.50 1.50
3740690.89 | 1.50 1.50 1.50
3740724.98 | 1.50 1.50 1.50
3740759.07 | 1.50 1.50 1.50
3740793.16 | 1.50 1.50 1.50
3740827.25 | 1.50 1.50 1.50
3740861.34 | 1.50 1.50 1.50
3740895.43 | 1.50 1.50 1.50
3740929.52 | 1.50 1.50 1.50
3740963.61 | 1.50 1.50 1.50
3740997.70 | 1.50 1.50 1.50
3741031.79 | 1.50 1.50 1.50
3741065.88 | 1.50 1.50 1.50
3741099.97 | 1.50 1.50 1.50
3741134.06 | 1.50 1.50 1.50
3741168.15 | 1.50 1.50 1.50
3741202.24 | 1.50 1.50 1.50
3741236.33 | 1.50 1.50 1.50
3741270.42 | 1.50 1.50 1.50
3741304.51 | 1.50 1.50 1.50
3741338.60 | 1.50 1.50 1.50
*** AERMOD ‐ VERSION 19191 *** *** I15 Roadway Emissions *** 01/28/23
*** AERMET ‐ VERSION 14134 *** *** *** 12:12:49
PAGE 8
*** MODELOPTs: RegDFAULT CONC ELEV NODRYDPLT NOWETDPLT RURAL *** NETWORK ID: ASNLR069 ; NETWORK TYPE: GRIDCART ***
* HILL HEIGHT SCALES IN METERS *
Y‐COORD | X‐COORD (METERS) (METERS) | 452879.30 452911.14 452942.97 452974.80 453006.64 453038.47 453070.31 453102.14 453133.98
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
3740656.80 | 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00
3740690.89 | 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00
3740724.98 | 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00
3740759.07 | 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00
3740793.16 | 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00
3740827.25 | 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00
3740861.34 | 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00
3740895.43 | 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00
3740929.52 | 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00
3740963.61 | 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00
3740997.70 | 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00
3741031.79 | 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00
3741065.88 | 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00
3741099.97 | 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00
3741134.06 | 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00
3741168.15 | 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00
3741202.24 | 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00
3741236.33 | 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00
3741270.42 | 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00
3741304.51 | 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00
3741338.60 | 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00
*** AERMOD ‐ VERSION 19191 *** *** I15 Roadway Emissions *** 01/28/23
*** AERMET ‐ VERSION 14134 *** *** *** 12:12:49
PAGE 9
*** MODELOPTs: RegDFAULT CONC ELEV NODRYDPLT NOWETDPLT RURAL *** NETWORK ID: ASNLR069 ; NETWORK TYPE: GRIDCART ***
* HILL HEIGHT SCALES IN METERS *
Y‐COORD | X‐COORD (METERS) (METERS) | 453165.82 453197.65 453229.48 453261.32 453293.15 453324.99 453356.83 453388.66 453420.49
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
3740656.80 | 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00
3740690.89 | 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00
3740724.98 | 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00
3740759.07 | 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00
3740793.16 | 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00
3740827.25 | 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00
3740861.34 | 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00
3740895.43 | 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00
3740929.52 | 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00
3740963.61 | 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00
3740997.70 | 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00
3741031.79 | 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00
3741065.88 | 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00
3741099.97 | 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00
3741134.06 | 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00
3741168.15 | 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00
3741202.24 | 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00
3741236.33 | 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00
3741270.42 | 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00
3741304.51 | 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00
3741338.60 | 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00
*** AERMOD ‐ VERSION 19191 *** *** I15 Roadway Emissions *** 01/28/23
*** AERMET ‐ VERSION 14134 *** *** *** 12:12:49
PAGE 10
*** MODELOPTs: RegDFAULT CONC ELEV NODRYDPLT NOWETDPLT RURAL *** NETWORK ID: ASNLR069 ; NETWORK TYPE: GRIDCART ***
* HILL HEIGHT SCALES IN METERS *
Y‐COORD | X‐COORD (METERS) (METERS) | 453452.33 453484.16 453516.00
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
3740656.80 | 0.00 0.00 0.00
3740690.89 | 0.00 0.00 0.00
3740724.98 | 0.00 0.00 0.00
3740759.07 | 0.00 0.00 0.00
3740793.16 | 0.00 0.00 0.00
3740827.25 | 0.00 0.00 0.00
3740861.34 | 0.00 0.00 0.00
3740895.43 | 0.00 0.00 0.00
3740929.52 | 0.00 0.00 0.00
3740963.61 | 0.00 0.00 0.00
3740997.70 | 0.00 0.00 0.00
3741031.79 | 0.00 0.00 0.00
3741065.88 | 0.00 0.00 0.00
3741099.97 | 0.00 0.00 0.00
3741134.06 | 0.00 0.00 0.00
3741168.15 | 0.00 0.00 0.00
3741202.24 | 0.00 0.00 0.00
3741236.33 | 0.00 0.00 0.00
3741270.42 | 0.00 0.00 0.00
3741304.51 | 0.00 0.00 0.00
3741338.60 | 0.00 0.00 0.00
*** AERMOD ‐ VERSION 19191 *** *** I15 Roadway Emissions *** 01/28/23
*** AERMET ‐ VERSION 14134 *** *** *** 12:12:49
PAGE 11
*** MODELOPTs: RegDFAULT CONC ELEV NODRYDPLT NOWETDPLT RURAL * SOURCE‐RECEPTOR COMBINATIONS FOR WHICH CALCULATIONS MAY NOT BE PERFORMED * LESS THAN 1.0 METER; WITHIN OPENPIT; OR BEYOND 80KM FOR FASTAREA/FASTALL SOURCE ‐ ‐ RECEPTOR LOCATION ‐ ‐ DISTANCE ID XR (METERS) YR (METERS) (METERS) ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ASNLR058 452879.3 3741270.4 0.88 ASNLR059 452879.3 3741270.4 ‐2.82 ASNLR05A 452879.3 3741236.3 ‐17.60 ASNLR05B 452879.3 3741236.3 ‐1.42 ASNLR05B 452879.3 3741202.2 ‐7.39 ASNLR05C 452879.3 3741202.2 ‐7.49 ASNLR05C 452911.1 3741202.2 ‐2.25 ASNLR05D 452911.1 3741168.1 ‐9.40 ASNLR05E 452911.1 3741168.1 ‐9.50 ASNLR05E 452911.1 3741134.1 ‐0.33 ASNLR05F 452911.1 3741134.1 ‐14.20 ASNLR05G 452911.1 3741100.0 0.42 ASNLR05G 452943.0 3741100.0 ‐0.22 ASNLR05H 452943.0 3741100.0 ‐13.80 ASNLR05I 452943.0 3741065.9 ‐12.63 ASNLR05J 452943.0 3741065.9 ‐6.44 ASNLR05K 452943.0 3741031.8 ‐2.06 ASNLR05K 452974.8 3741031.8 ‐9.55 ASNLR05L 452974.8 3741031.8 ‐4.38 ASNLR05L 452974.8 3740997.7 ‐4.86 ASNLR05M 452974.8 3740997.7 ‐15.62 ASNLR05N 452974.8 3740963.6 ‐4.35 ASNLR05N 453006.6 3740963.6 ‐1.48 ASNLR05O 453006.6 3740963.6 ‐8.94 ASNLR05P 453006.6 3740929.5 ‐17.72 ASNLR05Q 453006.6 3740929.5 ‐3.83 ASNLR05Q 453006.6 3740895.4 ‐1.83 ASNLR05R 453006.6 3740895.4 ‐4.43 ASNLR05R 453038.5 3740895.4 ‐7.50 ASNLR05S 453038.5 3740895.4 0.82 ASNLR05S 453038.5 3740861.3 ‐8.80 ASNLR05T 453038.5 3740861.3 ‐13.15 ASNLR05U 453038.5 3740827.2 ‐8.71 ASNLR05U 453070.3 3740827.2 ‐1.40 ASNLR05V 453070.3 3740827.2 ‐3.83 ASNLR05V 453070.3 3740793.2 0.52 ASNLR05W 453070.3 3740793.2 ‐19.62 ASNLR05X 453070.3 3740793.2 ‐0.25 ASNLR05X 453070.3 3740759.1 ‐7.17 ASNLR05Y 453070.3 3740759.1 ‐5.28
*** AERMOD ‐ VERSION 19191 *** *** I15 Roadway Emissions *** 01/28/23
*** AERMET ‐ VERSION 14134 *** *** *** 12:12:49
PAGE 12
*** MODELOPTs: RegDFAULT CONC ELEV NODRYDPLT NOWETDPLT RURAL * SOURCE‐RECEPTOR COMBINATIONS FOR WHICH CALCULATIONS MAY NOT BE PERFORMED * LESS THAN 1.0 METER; WITHIN OPENPIT; OR BEYOND 80KM FOR FASTAREA/FASTALL SOURCE ‐ ‐ RECEPTOR LOCATION ‐ ‐ DISTANCE ID XR (METERS) YR (METERS) (METERS) ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ASNLR05Y 453102.1 3740759.1 ‐4.12 ASNLR05Z 453102.1 3740725.0 ‐11.48 ASNLR060 453102.1 3740725.0 ‐8.88 ASNLR060 453102.1 3740690.9 ‐0.96 ASNLR061 453102.1 3740690.9 ‐12.11 ASNLR061 453134.0 3740690.9 ‐0.01 ASNLR062 453134.0 3740656.8 ‐2.12 ASNLR063 453134.0 3740656.8 ‐14.98
*** AERMOD ‐ VERSION 19191 *** *** I15 Roadway Emissions *** 01/28/23
*** AERMET ‐ VERSION 14134 *** *** *** 12:12:49
PAGE 13
*** MODELOPTs: RegDFAULT CONC ELEV NODRYDPLT NOWETDPLT RURAL *** METEOROLOGICAL DAYS SELECTED FOR PROCESSING ***
(1=YES; 0=NO)
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
METEOROLOGICAL DATA PROCESSED BETWEEN START DATE: 2011 1 1 1 AND END DATE: 2012 12 31 24
NOTE: METEOROLOGICAL DATA ACTUALLY PROCESSED WILL ALSO DEPEND ON WHAT IS INCLUDED IN THE DATA FILE.
*** UPPER BOUND OF FIRST THROUGH FIFTH WIND SPEED CATEGORIES *** (METERS/SEC)
1.54, 3.09, 5.14, 8.23, 10.80,
*** AERMOD ‐ VERSION 19191 *** *** I15 Roadway Emissions *** 01/28/23
*** AERMET ‐ VERSION 14134 *** *** *** 12:12:49
PAGE 14
*** MODELOPTs: RegDFAULT CONC ELEV NODRYDPLT NOWETDPLT RURAL *** UP TO THE FIRST 24 HOURS OF METEOROLOGICAL DATA *** Surface file: C:\USERS\RYAN\ONEDRIVE\LDNONE~1\CI9EA3~1\22‐161~1\HRA\SUBMIT~1\BREEZE~1\ELSI8.SF Met Version:
14134
Profile file: C:\USERS\RYAN\ONEDRIVE\LDNONE~1\CI9EA3~1\22‐161~1\HRA\SUBMIT~1\BREEZE~1\ELSI8.PF Surface format: FREE
Profile format: FREE
Surface station no.: 0 Upper air station no.: 3190 Name: UNKNOWN Name: UNKNOWN Year: 2008 Year: 2008 First 24 hours of scalar data
YR MO DY JDY HR H0 U* W* DT/DZ ZICNV ZIMCH M‐O LEN Z0 BOWEN ALBEDO REF WS WD HT REF TA HT
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
08 01 01 1 01 ‐999.0 ‐9.000 ‐9.000 ‐9.000 ‐999. ‐999. ‐99999.0 0.23 1.00 1.00 999.00 999. ‐9.0 284.2
5.5 08 01 01 1 02 ‐999.0 ‐9.000 ‐9.000 ‐9.000 ‐999. ‐999. ‐99999.0 0.23 1.00 1.00 999.00 999. ‐9.0 283.1
5.5 08 01 01 1 03 ‐999.0 ‐9.000 ‐9.000 ‐9.000 ‐999. ‐999. ‐99999.0 0.23 1.00 1.00 999.00 999. ‐9.0 283.1
5.5 08 01 01 1 04 ‐999.0 ‐9.000 ‐9.000 ‐9.000 ‐999. ‐999. ‐99999.0 0.23 1.00 1.00 999.00 999. ‐9.0 283.8
5.5 08 01 01 1 05 ‐999.0 ‐9.000 ‐9.000 ‐9.000 ‐999. ‐999. ‐99999.0 0.23 1.00 1.00 999.00 999. ‐9.0 283.8
5.5 08 01 01 1 06 ‐999.0 ‐9.000 ‐9.000 ‐9.000 ‐999. ‐999. ‐99999.0 0.23 1.00 1.00 999.00 999. ‐9.0 283.8
5.5 08 01 01 1 07 ‐999.0 ‐9.000 ‐9.000 ‐9.000 ‐999. ‐999. ‐99999.0 0.23 1.00 1.00 999.00 999. ‐9.0 283.1
5.5 08 01 01 1 08 ‐999.0 ‐9.000 ‐9.000 ‐9.000 ‐999. ‐999. ‐99999.0 0.23 1.00 0.54 999.00 999. ‐9.0 283.8
5.5 08 01 01 1 09 27.2 ‐9.000 ‐9.000 ‐9.000 60. ‐999. ‐99999.0 0.23 1.00 0.33 999.00 999. ‐9.0 285.9
5.5 08 01 01 1 10 74.6 ‐9.000 ‐9.000 ‐9.000 157. ‐999. ‐99999.0 0.23 1.00 0.25 999.00 999. ‐9.0 288.1
5.5 08 01 01 1 11 107.4 ‐9.000 ‐9.000 ‐9.000 375. ‐999. ‐99999.0 0.23 1.00 0.23 999.00 999. ‐9.0 289.9
5.5 08 01 01 1 12 122.7 ‐9.000 ‐9.000 ‐9.000 578. ‐999. ‐99999.0 0.23 1.00 0.22 999.00 999. ‐9.0 289.9
5.5 08 01 01 1 13 121.3 ‐9.000 ‐9.000 ‐9.000 714. ‐999. ‐99999.0 0.23 1.00 0.22 999.00 999. ‐9.0 291.4
5.5 08 01 01 1 14 102.1 ‐9.000 ‐9.000 ‐9.000 763. ‐999. ‐99999.0 0.23 1.00 0.23 999.00 999. ‐9.0 292.0
5.5 08 01 01 1 15 65.8 ‐9.000 ‐9.000 ‐9.000 792. ‐999. ‐99999.0 0.23 1.00 0.27 999.00 999. ‐9.0 291.4
5.5 08 01 01 1 16 16.0 ‐9.000 ‐9.000 ‐9.000 798. ‐999. ‐99999.0 0.23 1.00 0.36 999.00 999. ‐9.0 290.4
5.5 08 01 01 1 17 ‐999.0 ‐9.000 ‐9.000 ‐9.000 ‐999. ‐999. ‐99999.0 0.23 1.00 0.63 999.00 999. ‐9.0 288.8
5.5 08 01 01 1 18 ‐999.0 ‐9.000 ‐9.000 ‐9.000 ‐999. ‐999. ‐99999.0 0.23 1.00 1.00 999.00 999. ‐9.0 287.5
5.5 08 01 01 1 19 ‐999.0 ‐9.000 ‐9.000 ‐9.000 ‐999. ‐999. ‐99999.0 0.23 1.00 1.00 999.00 999. ‐9.0 286.4
5.5 08 01 01 1 20 ‐999.0 ‐9.000 ‐9.000 ‐9.000 ‐999. ‐999. ‐99999.0 0.23 1.00 1.00 999.00 999. ‐9.0 285.4
5.5 08 01 01 1 21 ‐999.0 ‐9.000 ‐9.000 ‐9.000 ‐999. ‐999. ‐99999.0 0.23 1.00 1.00 999.00 999. ‐9.0 284.2
5.5 08 01 01 1 22 ‐999.0 ‐9.000 ‐9.000 ‐9.000 ‐999. ‐999. ‐99999.0 0.23 1.00 1.00 999.00 999. ‐9.0 283.1
5.5 08 01 01 1 23 ‐999.0 ‐9.000 ‐9.000 ‐9.000 ‐999. ‐999. ‐99999.0 0.23 1.00 1.00 999.00 999. ‐9.0 283.1
5.5 08 01 01 1 24 ‐999.0 ‐9.000 ‐9.000 ‐9.000 ‐999. ‐999. ‐99999.0 0.23 1.00 1.00 999.00 999. ‐9.0 282.5
5.5 First hour of profile data
YR MO DY HR HEIGHT F WDIR WSPD AMB_TMP sigmaA sigmaW sigmaV 08 01 01 01 5.5 0 ‐999. ‐99.00 284.3 99.0 ‐99.00 ‐99.00 08 01 01 01 9.1 1 ‐999. ‐99.00 ‐999.0 99.0 ‐99.00 ‐99.00 F indicates top of profile (=1) or below (=0)
*** AERMOD ‐ VERSION 19191 *** *** I15 Roadway Emissions *** 01/28/23
*** AERMET ‐ VERSION 14134 *** *** *** 12:12:49
PAGE 15
*** MODELOPTs: RegDFAULT CONC ELEV NODRYDPLT NOWETDPLT RURAL *** THE ANNUAL AVERAGE CONCENTRATION VALUES AVERAGED OVER 2 YEARS FOR SOURCE GROUP: ALL ***
INCLUDING SOURCE(S): ASNLR058 , ASNLR059 , ASNLR05A , ASNLR05B , ASNLR05C ,
ASNLR05D , ASNLR05E , ASNLR05F , ASNLR05G , ASNLR05H , ASNLR05I , ASNLR05J , ASNLR05K ,
ASNLR05L , ASNLR05M , ASNLR05N , ASNLR05O , ASNLR05P , ASNLR05Q , ASNLR05R , ASNLR05S ,
ASNLR05T , ASNLR05U , ASNLR05V , ASNLR05W , ASNLR05X , ASNLR05Y , ASNLR05Z , . . . ,
*** NETWORK ID: ASNLR069 ; NETWORK TYPE: GRIDCART ***
** CONC OF PM10 IN MICROGRAMS/M**3 ** Y‐COORD | X‐COORD (METERS) (METERS) | 452879.30 452911.14 452942.97 452974.80 453006.64 453038.47 453070.31 453102.14 453133.98
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
3740656.80 | 0.02097 0.02374 0.02721 0.03169 0.03778 0.04677 0.06230
0.10147 0.08638
3740690.89 | 0.02286 0.02612 0.03029 0.03582 0.04365 0.05599 0.07994
0.09186 0.09874
3740724.98 | 0.02489 0.02873 0.03373 0.04058 0.05071 0.06784 0.10701
0.09708 0.09367
3740759.07 | 0.02710 0.03161 0.03764 0.04616 0.05937 0.08376 0.09576
0.10800 0.07913
3740793.16 | 0.02952 0.03485 0.04213 0.05279 0.07028 0.10764 0.08530
0.10196 0.06917
3740827.25 | 0.03220 0.03851 0.04736 0.06083 0.08473 0.11874 0.09555
0.08465 0.06155
3740861.34 | 0.03519 0.04268 0.05351 0.07086 0.10620 0.10610 0.10821
0.07297 0.05535
3740895.43 | 0.03854 0.04750 0.06092 0.08409 0.09798 0.10128 0.08856
0.06416 0.05010
3740929.52 | 0.04233 0.05313 0.07013 0.10350 0.10897 0.11330 0.07550
0.05708 0.04553
3740963.61 | 0.04667 0.05988 0.08224 0.11433 0.10204 0.09132 0.06567
0.05111 0.04147
3740997.70 | 0.05170 0.06824 0.09982 0.10759 0.11732 0.07689 0.05777
0.04595 0.03782
3741031.79 | 0.05767 0.07918 0.11012 0.10284 0.09295 0.06606 0.05113
0.04139 0.03451
3741065.88 | 0.06500 0.09489 0.10405 0.12051 0.07704 0.05733 0.04540
0.03733 0.03150
3741099.97 | 0.07449 0.10416 0.10349 0.09308 0.06505 0.04999 0.04038
0.03369 0.02875
3741134.06 | 0.08791 0.10188 0.12179 0.07530 0.05536 0.04369 0.03595
0.03041 0.02623
3741168.15 | 0.11053 0.09607 0.09055 0.06186 0.04728 0.03824 0.03202
0.02744 0.02392
3741202.24 | 0.08805 0.09643 0.07012 0.05110 0.04045 0.03349 0.02852
0.02476 0.02181
3741236.33 | 0.08559 0.08155 0.05492 0.04236 0.03467 0.02935 0.02541
0.02234 0.01987
3741270.42 | 0.05564 0.05774 0.04340 0.03524 0.02975 0.02573 0.02262
0.02013 0.01809
3741304.51 | 0.05348 0.04173 0.03443 0.02932 0.02551 0.02252 0.02011
0.01812 0.01644
3741338.60 | 0.03551 0.03091 0.02732 0.02431 0.02178 0.01964 0.01783
0.01627 0.01491
*** AERMOD ‐ VERSION 19191 *** *** I15 Roadway Emissions *** 01/28/23
*** AERMET ‐ VERSION 14134 *** *** *** 12:12:49
PAGE 16
*** MODELOPTs: RegDFAULT CONC ELEV NODRYDPLT NOWETDPLT RURAL *** THE ANNUAL AVERAGE CONCENTRATION VALUES AVERAGED OVER 2 YEARS FOR SOURCE GROUP: ALL ***
INCLUDING SOURCE(S): ASNLR058 , ASNLR059 , ASNLR05A , ASNLR05B , ASNLR05C ,
ASNLR05D , ASNLR05E , ASNLR05F , ASNLR05G , ASNLR05H , ASNLR05I , ASNLR05J , ASNLR05K ,
ASNLR05L , ASNLR05M , ASNLR05N , ASNLR05O , ASNLR05P , ASNLR05Q , ASNLR05R , ASNLR05S ,
ASNLR05T , ASNLR05U , ASNLR05V , ASNLR05W , ASNLR05X , ASNLR05Y , ASNLR05Z , . . . ,
*** NETWORK ID: ASNLR069 ; NETWORK TYPE: GRIDCART ***
** CONC OF PM10 IN MICROGRAMS/M**3 ** Y‐COORD | X‐COORD (METERS) (METERS) | 453165.82 453197.65 453229.48 453261.32 453293.15 453324.99 453356.83 453388.66 453420.49
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
3740656.80 | 0.08089 0.05457 0.04095 0.03235 0.02646 0.02220 0.01899
0.01649 0.01450
3740690.89 | 0.07097 0.05140 0.03988 0.03211 0.02652 0.02234 0.01914
0.01663 0.01461
3740724.98 | 0.06354 0.04810 0.03824 0.03130 0.02615 0.02220 0.01910
0.01664 0.01464
3740759.07 | 0.05754 0.04491 0.03638 0.03019 0.02549 0.02182 0.01889
0.01652 0.01458
3740793.16 | 0.05249 0.04190 0.03446 0.02892 0.02464 0.02126 0.01852
0.01628 0.01443
3740827.25 | 0.04810 0.03907 0.03254 0.02757 0.02369 0.02058 0.01805
0.01595 0.01420
3740861.34 | 0.04421 0.03642 0.03065 0.02620 0.02268 0.01983 0.01749
0.01554 0.01390
3740895.43 | 0.04070 0.03393 0.02883 0.02484 0.02165 0.01904 0.01689
0.01508 0.01354
3740929.52 | 0.03751 0.03160 0.02707 0.02350 0.02061 0.01823 0.01625
0.01458 0.01315
3740963.61 | 0.03458 0.02941 0.02539 0.02220 0.01959 0.01742 0.01560
0.01405 0.01272
3740997.70 | 0.03188 0.02735 0.02380 0.02093 0.01858 0.01661 0.01494
0.01351 0.01228
3741031.79 | 0.02938 0.02542 0.02228 0.01972 0.01759 0.01580 0.01428
0.01297 0.01183
3741065.88 | 0.02708 0.02361 0.02083 0.01855 0.01664 0.01501 0.01362
0.01242 0.01137
3741099.97 | 0.02494 0.02191 0.01946 0.01742 0.01571 0.01425 0.01298
0.01188 0.01092
3741134.06 | 0.02295 0.02032 0.01816 0.01635 0.01482 0.01350 0.01236
0.01135 0.01047
3741168.15 | 0.02112 0.01883 0.01694 0.01534 0.01397 0.01278 0.01175
0.01083 0.01002
3741202.24 | 0.01942 0.01744 0.01578 0.01437 0.01315 0.01209 0.01115
0.01032 0.00958
3741236.33 | 0.01784 0.01614 0.01469 0.01345 0.01237 0.01142 0.01057
0.00982 0.00914
3741270.42 | 0.01637 0.01491 0.01366 0.01257 0.01162 0.01077 0.01001
0.00933 0.00872
3741304.51 | 0.01501 0.01377 0.01269 0.01174 0.01090 0.01015 0.00947
0.00886 0.00831
3741338.60 | 0.01373 0.01269 0.01177 0.01095 0.01021 0.00955 0.00895
0.00841 0.00791
*** AERMOD ‐ VERSION 19191 *** *** I15 Roadway Emissions *** 01/28/23
*** AERMET ‐ VERSION 14134 *** *** *** 12:12:49
PAGE 17
*** MODELOPTs: RegDFAULT CONC ELEV NODRYDPLT NOWETDPLT RURAL *** THE ANNUAL AVERAGE CONCENTRATION VALUES AVERAGED OVER 2 YEARS FOR SOURCE GROUP: ALL ***
INCLUDING SOURCE(S): ASNLR058 , ASNLR059 , ASNLR05A , ASNLR05B , ASNLR05C ,
ASNLR05D , ASNLR05E , ASNLR05F , ASNLR05G , ASNLR05H , ASNLR05I , ASNLR05J , ASNLR05K ,
ASNLR05L , ASNLR05M , ASNLR05N , ASNLR05O , ASNLR05P , ASNLR05Q , ASNLR05R , ASNLR05S ,
ASNLR05T , ASNLR05U , ASNLR05V , ASNLR05W , ASNLR05X , ASNLR05Y , ASNLR05Z , . . . ,
*** NETWORK ID: ASNLR069 ; NETWORK TYPE: GRIDCART ***
** CONC OF PM10 IN MICROGRAMS/M**3 ** Y‐COORD | X‐COORD (METERS) (METERS) | 453452.33 453484.16 453516.00
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
3740656.80 | 0.01287 0.01152 0.01040
3740690.89 | 0.01297 0.01160 0.01046
3740724.98 | 0.01301 0.01164 0.01050
3740759.07 | 0.01298 0.01164 0.01050
3740793.16 | 0.01288 0.01157 0.01046
3740827.25 | 0.01272 0.01146 0.01038
3740861.34 | 0.01250 0.01130 0.01026
3740895.43 | 0.01223 0.01109 0.01010
3740929.52 | 0.01192 0.01085 0.00991
3740963.61 | 0.01158 0.01057 0.00969
3740997.70 | 0.01121 0.01027 0.00945
3741031.79 | 0.01084 0.00996 0.00919
3741065.88 | 0.01045 0.00964 0.00892
3741099.97 | 0.01007 0.00931 0.00864
3741134.06 | 0.00968 0.00898 0.00836
3741168.15 | 0.00930 0.00865 0.00807
3741202.24 | 0.00891 0.00831 0.00777
3741236.33 | 0.00853 0.00798 0.00748
3741270.42 | 0.00816 0.00766 0.00720
3741304.51 | 0.00780 0.00734 0.00692
3741338.60 | 0.00745 0.00702 0.00664
*** AERMOD ‐ VERSION 19191 *** *** I15 Roadway Emissions *** 01/28/23
*** AERMET ‐ VERSION 14134 *** *** *** 12:12:49
PAGE 18
*** MODELOPTs: RegDFAULT CONC ELEV NODRYDPLT NOWETDPLT RURAL *** THE ANNUAL AVERAGE CONCENTRATION VALUES AVERAGED OVER 2 YEARS FOR SOURCE GROUP: ALL ***
INCLUDING SOURCE(S): ASNLR058 , ASNLR059 , ASNLR05A , ASNLR05B , ASNLR05C ,
ASNLR05D , ASNLR05E , ASNLR05F , ASNLR05G , ASNLR05H , ASNLR05I , ASNLR05J , ASNLR05K ,
ASNLR05L , ASNLR05M , ASNLR05N , ASNLR05O , ASNLR05P , ASNLR05Q , ASNLR05R , ASNLR05S ,
ASNLR05T , ASNLR05U , ASNLR05V , ASNLR05W , ASNLR05X , ASNLR05Y , ASNLR05Z , . . . ,
*** SENSITIVE DISCRETE RECEPTOR POINTS ***
** CONC OF PM10 IN MICROGRAMS/M**3 ** X‐COORD (M) Y‐COORD (M) CONC X‐COORD (M) Y‐COORD (M) CONC ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
453204.60 3741198.20 0.01735 453204.60 3741161.80 0.01881
453215.10 3741112.80 0.02014 453221.20 3741072.10 0.02142
453223.40 3741059.40 0.02179
*** AERMOD ‐ VERSION 19191 *** *** I15 Roadway Emissions *** 01/28/23
*** AERMET ‐ VERSION 14134 *** *** *** 12:12:49
PAGE 19
*** MODELOPTs: RegDFAULT CONC ELEV NODRYDPLT NOWETDPLT RURAL *** THE SUMMARY OF MAXIMUM ANNUAL RESULTS AVERAGED OVER 2 YEARS *** ** CONC OF PM10 IN MICROGRAMS/M**3 **
NETWORK
GROUP ID AVERAGE CONC RECEPTOR (XR, YR, ZELEV, ZHILL, ZFLAG) OF TYPE GRID‐ID
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
ALL 1ST HIGHEST VALUE IS 0.12179 AT ( 452942.97, 3741134.06, 1.50, 0.00, 0.00) GC ASNLR069
2ND HIGHEST VALUE IS 0.12051 AT ( 452974.80, 3741065.88, 1.50, 0.00, 0.00) GC ASNLR069
3RD HIGHEST VALUE IS 0.11874 AT ( 453038.47, 3740827.25, 1.50, 0.00, 0.00) GC ASNLR069
4TH HIGHEST VALUE IS 0.11732 AT ( 453006.64, 3740997.70, 1.50, 0.00, 0.00) GC ASNLR069
5TH HIGHEST VALUE IS 0.11433 AT ( 452974.80, 3740963.61, 1.50, 0.00, 0.00) GC ASNLR069
6TH HIGHEST VALUE IS 0.11330 AT ( 453038.47, 3740929.52, 1.50, 0.00, 0.00) GC ASNLR069
7TH HIGHEST VALUE IS 0.11053 AT ( 452879.30, 3741168.15, 1.50, 0.00, 0.00) GC ASNLR069
8TH HIGHEST VALUE IS 0.11012 AT ( 452942.97, 3741031.79, 1.50, 0.00, 0.00) GC ASNLR069
9TH HIGHEST VALUE IS 0.10897 AT ( 453006.64, 3740929.52, 1.50, 0.00, 0.00) GC ASNLR069
10TH HIGHEST VALUE IS 0.10821 AT ( 453070.31, 3740861.34, 1.50, 0.00, 0.00) GC ASNLR069
*** RECEPTOR TYPES: GC = GRIDCART
GP = GRIDPOLR
DC = DISCCART
DP = DISCPOLR
*** AERMOD ‐ VERSION 19191 *** *** I15 Roadway Emissions *** 01/28/23
*** AERMET ‐ VERSION 14134 *** *** *** 12:12:49
PAGE 20
*** MODELOPTs: RegDFAULT CONC ELEV NODRYDPLT NOWETDPLT RURAL *** Message Summary : AERMOD Model Execution ***
‐‐‐‐‐‐‐‐‐ Summary of Total Messages ‐‐‐‐‐‐‐‐
A Total of 0 Fatal Error Message(s)
A Total of 0 Warning Message(s)
A Total of 1916 Informational Message(s)
A Total of 17544 Hours Were Processed
A Total of 4 Calm Hours Identified
A Total of 973 Missing Hours Identified ( 5.55 Percent)
******** FATAL ERROR MESSAGES ********
*** NONE ***
******** WARNING MESSAGES ********
*** NONE ***
************************************
*** AERMOD Finishes Successfully ***
************************************
Source: EMFAC2021 (v1.0.2) Emission Rates
Region Type: Sub‐Area RoadwayADT 164000 Trips/Day
Region: San Diego (SD)
RoadwaySegmentAERMOD_V
olumeSourceDistance 0.484 Miles/Trip
Calendar Year: 2025 SegmentVMT 79376 Miles/Day
Season: Annual
Vehicle Classification: EMFAC2007 Categories
Units: miles/day for CVMT and EVMT, g/mile for RUNEX, PMBW and PMTW, mph for Speed, kWh/mile for Energy Consumption, gallon/mile for Fuel Consumption. PHEV calculated based on total VMT.
Region CalYr VehClass MdlYr Speed Fuel VMT %ofTotalVMT
VMT on Roadway
Segment PM10_RUNEX Total Grams
Grams from DSL
Only
Riverside (SC) 2025 HHDT Aggregate 65 Gasoline 48.10469363 0.00161% 1.274783246 0.001381017 0.001760498 0 Riverside (SC) 2025 HHDT Aggregate 65 Diesel 271821.8956 9.07495% 7203.330327 0.033882057 244.0636519 244.0636519 Riverside (SC) 2025 HHDT Aggregate 65 Electricity 1663.021031 0.05552% 44.0703638 0 0 0 Riverside (SC) 2025 HHDT Aggregate 65 Natural Gas 8057.303988 0.26900% 213.5200405 0.001932202 0.41256383 0 Riverside (SC) 2025 LDA Aggregate 65 Gasoline 1307182.608 43.64113% 34640.58001 0.001181474 40.92695263 0 Riverside (SC) 2025 LDA Aggregate 65 Diesel 3207.749079 0.10709% 85.00594174 0.013895104 1.181166437 1.181166437 Riverside (SC) 2025 LDA Aggregate 65 Electricity 857.485268 0.02863% 22.72351763 0 0 0 Riverside (SC) 2025 LDA Aggregate 65 Plug‐in Hybrid 21936.81835 0.73237% 581.329729 0.001199528 0.69732103 0 Riverside (SC) 2025 LDT1 Aggregate 65 Gasoline 96215.08225 3.21220% 2549.717411 0.001950666 4.97364784 0 Riverside (SC) 2025 LDT1 Aggregate 65 Diesel 19.13079861 0.00064% 0.506969689 0.253011526 0.128269174 0.128269174 Riverside (SC) 2025 LDT1 Aggregate 65 Electricity 3.040293291 0.00010% 0.080568333 0 0 0 Riverside (SC) 2025 LDT1 Aggregate 65 Plug‐in Hybrid 119.4754557 0.00399% 3.166121595 0.000836327 0.002647914 0 Riverside (SC) 2025 LDT2 Aggregate 65 Gasoline 575770.9582 19.22248% 15258.0365 0.001192922 18.20164932 0 Riverside (SC) 2025 LDT2 Aggregate 65 Diesel 1958.12918 0.06537% 51.89078412 0.004519975 0.234545024 0.234545024 Riverside (SC) 2025 LDT2 Aggregate 65 Electricity 43.59383124 0.00146% 1.155244562 0 0 0 Riverside (SC) 2025 LDT2 Aggregate 65 Plug‐in Hybrid 3076.868961 0.10272% 81.5375945 0.00096444 0.078638082 0 Riverside (SC) 2025 LHDT1 Aggregate 65 Gasoline 76659.60917 2.55933% 2031.49377 0.001167503 2.371775674 0 Riverside (SC) 2025 LHDT1 Aggregate 65 Diesel 57077.70129 1.90558% 1512.569603 0.024119761 36.48281658 36.48281658 Riverside (SC) 2025 LHDT1 Aggregate 65 Electricity 1150.552957 0.03841% 30.48986539 0 0 0 Riverside (SC) 2025 LHDT2 Aggregate 65 Gasoline 10387.47273 0.34679% 275.2699415 0.001024092 0.281901681 0 Riverside (SC) 2025 LHDT2 Aggregate 65 Diesel 25982.74359 0.86745% 688.5474935 0.022015717 15.15886705 15.15886705 Riverside (SC) 2025 LHDT2 Aggregate 65 Electricity 268.2960938 0.00896% 7.109895931 0 0 0 Riverside (SC) 2025 MCY Aggregate 65 Gasoline 8889.366937 0.29678% 235.569862 0.001793683 0.422537601 0 Riverside (SC) 2025 MDV Aggregate 65 Gasoline 413723.0254 13.81241% 10963.73642 0.001244364 13.64288275 0 Riverside (SC) 2025 MDV Aggregate 65 Diesel 6385.604972 0.21319% 169.2197086 0.008226206 1.392036238 1.392036238 Riverside (SC) 2025 MDV Aggregate 65 Electricity 48.00086466 0.00160% 1.272031759 0 0 0 Riverside (SC) 2025 MDV Aggregate 65 Plug‐in Hybrid 1985.214465 0.06628% 52.60854916 0.001182611 0.062215469 0 Riverside (SC) 2025 MH Aggregate 65 Gasoline 5104.047236 0.17040% 135.2581924 0.001050376 0.142072 0 Riverside (SC) 2025 MH Aggregate 65 Diesel 2313.106635 0.07722% 61.29775211 0.158644979 9.724580615 9.724580615 Riverside (SC) 2025 MHDT Aggregate 65 Gasoline 6541.207032 0.21838% 173.3431918 0.000921507 0.159736954 0 Riverside (SC) 2025 MHDT Aggregate 65 Diesel 74887.05709 2.50015% 1984.520814 0.013346723 26.48685026 26.48685026 Riverside (SC) 2025 MHDT Aggregate 65 Electricity 806.8497605 0.02694% 21.38166735 0 0 0 Riverside (SC) 2025 MHDT Aggregate 65 Natural Gas 1051.119193 0.03509% 27.85485234 0.000657128 0.018304207 0 Riverside (SC) 2025 OBUS Aggregate 65 Gasoline 2179.696262 0.07277% 57.76235264 0.000709344 0.040973379 0 Riverside (SC) 2025 OBUS Aggregate 65 Diesel 3207.719971 0.10709% 85.00517037 0.047343653 4.024455273 4.024455273 Riverside (SC) 2025 OBUS Aggregate 65 Electricity 24.08385788 0.00080% 0.638226672 0 0 0 Riverside (SC) 2025 OBUS Aggregate 65 Natural Gas 398.0120176 0.01329% 10.54739181 0.000573793 0.006052022 0 Riverside (SC) 2025 SBUS Aggregate 65 Gasoline 408.131231 0.01363% 10.81555283 0.000562456 0.006083277 0 Riverside (SC) 2025 SBUS Aggregate 65 Diesel 240.4095703 0.00803% 6.370897919 0.043121147 0.274720426 0.274720426 Riverside (SC) 2025 SBUS Aggregate 65 Electricity 3.465538021 0.00012% 0.091837396 0 0 0 Riverside (SC) 2025 SBUS Aggregate 65 Natural Gas 268.770236 0.00897% 7.122460786 0.002120519 0.015103313 0 Riverside (SC) 2025 UBUS Aggregate 65 Gasoline 1561.676556 0.05214% 41.38471654 0.000960395 0.039745663 0 Riverside (SC) 2025 UBUS Aggregate 65 Diesel 1.704773148 0.00006% 0.045176803 0.005302537 0.000239552 0.000239552 Riverside (SC) 2025 UBUS Aggregate 65 Electricity 1.911323813 0.00006% 0.050650433 0 0 0 Riverside (SC) 2025 UBUS Aggregate 65 Natural Gas 1762.103058 0.05883% 46.69605578 7.68439E‐05 0.003588308 0 Total VMT 2995299.925 100.00000% 79376
Total Grams from DSL Only
PM10 per Day 339.1521986
Total Grams from DSL PM10
per Second (g/s) 0.003925373
MERV 13 %Passing from
Roadway (g/s) 0.000392537
REC: R1 (Indoor Area)
Age (Years) 3rd Trimester (0.25) 0‐2 2‐9 2‐16 16‐30 16‐70 Cair (annual) ‐ From AERMOD 0.01735 0.01735 0.01735 0.01735 0.01735 0.01735 Average Breathing Rate per agegroup BR/BW 225 658 535 452 210 185 A (Default is 1) 1 1 1 1 11
Exposure Frequency = EF (days/365days) 0.96 0.96 0.96 0.96 0.96 0.96 10^‐6 Microgram to Milligram / liters to m3 0.000001 0.000001 0.000001 0.000001 0.000001 0.000001 Dose‐inh 0.00000375 0.00001096 0.00000891 0.00000753 0.00000350 0.00000308 Potency factor for Diesel 1.1 1.1 1.1 1.1 1.1 1.1
Age Sensitivity Factor 10 10 3 3 1 1
ED (Residents live onsite for 30 years) 0.25 2 7 14 14 54 AT 70 70 70 70 70 70
FAH 0.85 0.85 0.72 0.72 0.73 1
Risk for Each Age Group 1.25143E‐07 2.92779E‐06 2.11724E‐06 3.57755E‐06 5.6174E‐07 2.61475E‐06
0.125143071 2.92779168 2.117244096 3.577548902 0.561740256 2.614754057 Cancer Risk Per Million 30‐years 7.19
REC: R2 (Indoor Area)
Age (Years) 3rd Trimester (0.25) 0‐2 2‐9 2‐16 16‐30 16‐70 Cair (annual) ‐ From AERMOD 0.01881 0.01881 0.01881 0.01881 0.01881 0.01881 Average Breathing Rate per agegroup BR/BW 225 658 535 452 210 185 A (Default is 1) 1 1 1 1 1 1
Exposure Frequency = EF (days/365days) 0.96 0.96 0.96 0.96 0.96 1 10^‐6 Microgram to Milligram / liters to m3 0.000001 0.000001 0.000001 0.000001 0.000001 0.000001 Dose‐inh 0.00000406 0.00001188 0.00000966 0.00000816 0.00000379 0.00000348 Potency factor for Diesel 1.1 1.1 1.1 1.1 1.1 1.1
Age Sensitivity Factor 10 10 3 3 1 1
ED (Residents live onsite for 30 years) 0.25 2 7 14 14 54 AT 70 70 70 70 70 70
FAH 0.85 0.85 0.72 0.72 0.73 1
Risk for Each Age Group 1.35674E‐07 3.17416E‐06 2.29541E‐06 3.8786E‐06 6.09011E‐07 2.9529E‐06
0.135673843 3.174164928 2.295409882 3.878599127 0.609010618 2.952901286 Cancer Risk Per Million 30‐years 7.80
REC: R3 (Indoor Area)
Age (Years) 3rd Trimester (0.25) 0‐2 2‐9 2‐16 16‐30 16‐70 Cair (annual) ‐ From AERMOD 0.02014 0.02014 0.02014 0.02014 0.02014 0.02014 Average Breathing Rate per agegroup BR/BW 225 658 535 452 210 185 A (Default is 1) 1 1 1 1 1 1
Exposure Frequency = EF (days/365days) 0.96 0.96 0.96 0.96 0.96 1 10^‐6 Microgram to Milligram / liters to m3 0.000001 0.000001 0.000001 0.000001 0.000001 0.000001 Dose‐inh 0.00000435 0.00001272 0.00001034 0.00000874 0.00000406 0.00000373 Potency factor for Diesel 1.1 1.1 1.1 1.1 1.1 1.1
Age Sensitivity Factor 10 10 3 3 1 1
ED (Residents live onsite for 30 years) 0.25 2 7 14 14 54 AT 70 70 70 70 70 70
FAH 0.85 0.85 0.72 0.72 0.73 1
Risk for Each Age Group 1.45267E‐07 3.3986E‐06 2.45771E‐06 4.15284E‐06 6.52072E‐07 3.16169E‐06
0.145266943 3.398600832 2.45771159 4.15284351 0.652071974 3.161692286 Cancer Risk Per Million 30‐years 8.35
REC: R4 (Indoor Area)
Age (Years) 3rd Trimester (0.25) 0‐2 2‐9 2‐16 16‐30 16‐70 Cair (annual) ‐ From AERMOD 0.02142 0.02142 0.02142 0.02142 0.02142 0.02142 Average Breathing Rate per agegroup BR/BW 225 658 535 452 210 185 A (Default is 1) 1 1 1 1 1 1
Exposure Frequency = EF (days/365days) 0.96 0.96 0.96 0.96 0.96 1 10^‐6 Microgram to Milligram / liters to m3 0.000001 0.000001 0.000001 0.000001 0.000001 0.000001 Dose‐inh 0.00000463 0.00001353 0.00001100 0.00000929 0.00000432 0.00000396 Potency factor for Diesel 1.1 1.1 1.1 1.1 1.1 1.1
Age Sensitivity Factor 10 10 3 3 1 1
ED (Residents live onsite for 30 years) 0.25 2 7 14 14 54 AT 70 70 70 70 70 70
FAH 0.85 0.85 0.72 0.72 0.73 1
Risk for Each Age Group 1.54499E‐07 3.6146E‐06 2.61391E‐06 4.41678E‐06 6.93514E‐07 3.36263E‐06
0.1544994 3.614599296 2.613911731 4.416777953 0.693514483 3.362634 Cancer Risk Per Million 30‐years 8.88
Cancer Risk Calculations
REC: R5 (Indoor Area)
Age (Years) 3rd Trimester (0.25) 0‐2 2‐9 2‐16 16‐30 16‐70 Cair (annual) ‐ From AERMOD 0.02179 0.02179 0.02179 0.02179 0.02179 0.02179 Average Breathing Rate per agegroup BR/BW 225 658 535 452 210 185 A (Default is 1) 1 1 1 1 1 1
Exposure Frequency = EF (days/365days) 0.96 0.96 0.96 0.96 0.96 1 10^‐6 Microgram to Milligram / liters to m3 0.000001 0.000001 0.000001 0.000001 0.000001 0.000001 Dose‐inh 0.00000471 0.00001376 0.00001119 0.00000946 0.00000439 0.00000403 Potency factor for Diesel 1.1 1.1 1.1 1.1 1.1 1.1
Age Sensitivity Factor 10 10 3 3 1 1
ED (Residents live onsite for 30 years) 0.25 2 7 14 14 54 AT 70 70 70 70 70 70
FAH 0.85 0.85 0.72 0.72 0.73 1
Risk for Each Age Group 1.57168E‐07 3.67704E‐06 2.65906E‐06 4.49307E‐06 7.05494E‐07 3.42072E‐06
0.157168157 3.677036352 2.659063334 4.493071503 0.705493958 3.420718714 Cancer Risk Per Million 30‐years 9.03
Cancer Risk Calculations