CONTRACT
THIS CONTRACT is made this 4th day of December, 2024, in the County of Riverside, State of California, by and between the City of Corona, hereinafter called City, and Onyx Paving Company, Inc. hereinafter called Contractor. The City and the Contractor for the considerations stated herein agree as follows:

ARTICLE 1. SCOPE OF WORK. The Contractor shall perform all Work within the time stipulated the Contract and shall provide all labor, materials, equipment, tools, utility services, and transportation to complete all of the Work required in strict compliance with the Contract Documents as specified in Article 5 below for the following Project:

CITYWIDE PAVEMENT REHABILITATION, PROJECT NO. ST-2025-26, NIB NO.25-024AS The Contractor and its surety shall be liable to the City for any damages arising as a result of the ARTICLE 2. TIME FOR COMPLETION. A Move-in period of 7 calendar days shall start on the date of issuance of the Notice to Proceed. This period shall be used by the Contractor to confirm utility locations, turn in project submittals or other supporting documentation for approval and procure the necessary material and equipment to complete the Work. The Work shall commence on the last day of the Move-in period or the first Working Day the Contractor actually starts the Work, whichever occurs first. The Contractor shall complete all Work required by the Contract Documents within 150 Working Days. By its signature hereunder, Contractor agrees the time for completion set forth above is adequate and reasonable to complete the Work.

ARTICLE 3. CONTRACT PRICE. The City shall pay to the Contractor as full compensation for the performance of the Contract, subject to any additions or deductions as provided in the Contract Documents, and including all applicable taxes and costs, the sum of Ten Million Nine Hundred Sixty-Three Thousand Dollars and Zero Cents ($10,963,000.00) Payment shall be made as set forth in the General Conditions.

ARTICLE 4. LIQUIDATED DAMAGES. In accordance with Government Code section 53069.85, it is agreed that the Contractor will pay the City the sum of $1,500 for each and every calendar day of delay beyond the time prescribed in the Contract Documents for finishing the Work, as Liquidated Damages and not as a penalty or forfeiture. In the event this is not paid, the Contractor agrees the City may deduct that amount from any money due or that may become due the Contractor under the Contract. This Article does not exclude recovery of other damages specified in the Contract Documents.

ARTICLE 5. COMPONENT PARTS OF THE CONTRACT
the following:

Notice Inviting Bids
Instructions to Bidders
Contractor's Bid Forms
Bid Bond
Designation of Subcontractors
Information Required of Bidders
Docusign Envelope ID: EB6AD4E2-6EAA-47E9-870F-CBEC24EB950C Docusign Envelope ID: 4C5CA85F-4A9A-4E17-8C52-32EBECA0B326 Non-Collusion Declaration form
Contract
Performance Bond
Payment (Labor and Materials) Bond
General Conditions
Special Provisions (or Special Conditions)
Technical Specifications
Addenda
Plans and Contract Drawings
Approved and fully executed change orders
Any other documents contained in or incorporated into the Contract The Contactor shall complete the Work in strict accordance with all of the Contract Documents.

All of the Contract Documents are intended to be complementary. Work required by one of the Contract Documents and not by others shall be done as if required by all. This Contract shall supersede any prior agreement of the parties.

ARTICLE 6. PROVISIONS REQUIRED BY LAW. Each and every provision of law required to be included in these Contract Documents shall be deemed to be included in these Contract Documents. The Contractor shall comply with all requirements of applicable federal, state and local laws, rules and regulations, including, but not limited to, the provisions of the California Labor Code and California Public Contract Code which are applicable to this Project.

ARTICLE 7. INDEMNIFICATION. Contractor shall provide indemnification as set forth in the General Conditions.

ARTICLE 8. PREVAILING WAGES. Contractor is aware of the prevailing wage requirements of Chapter 1 (beginning at Section 1720 et seq.) of Part 7 of Division 2 of the California Labor Code, as well as Title 8, Section 16000 et seq. of the California Code of Regulations Contractor and its subcontractors
shall fully comply with the Prevailing Wage Laws for their employees and any others to whom such laws are applicable. Contractor and its subcontractors shall also be responsible for any and all violations and fines imposed on them pursuant to the Prevailing Wage Laws. Pursuant to SB 854, which amended the Prevailing Wage Laws, this Contract is subject to compliance monitoring and enforcement by the DIR. Beginning April 1, 2015, no contractor or subcontractor may be awarded this Contract unless registered with the DIR pursuant to Labor Code section 1725.5. The City will report all necessary contracts to the DIR as required by the Prevailing Wage Laws.

Contractor shall make copies of the prevailing rates of per diem wages for each craft, classification or type of worker needed to execute the Work available to interested parties upon request, and siness and at the Project site. It is most
efficient for the Contractor to obtain a copy of the prevailing wages in effect at the commencement of this Contract from the website of the Division of Labor Statistics and Research of the DIR located at www.dir.ca.gov/dlsr/. In the alternative, the Contractor may obtain a copy of the prevailing wages from the City. Contractor shall defend, indemnify and hold the City, its elected officials, officers, employees and agents free and harmless from any claim or liability arising out of any failure or alleged failure to comply with the Prevailing Wage Laws. If the Work involves federal funds or otherwise requires compliance with the Davis-Bacon Fair Labor Standards Act, the Contractor and all its subcontractors shall comply with the higher of the state or federal prevailing wage rates.

Docusign Envelope ID: EB6AD4E2-6EAA-47E9-870F-CBEC24EB950C Docusign Envelope ID: 4C5CA85F-4A9A-4E17-8C52-32EBECA0B326 IN WITNESS WHEREOF, this Contract has been duly executed by the above-named parties, on the day and year above written.

CITY OF CORONA
By: ______________________________ Savat Khamphou
Public Works Director/City Engineer
Reviewed By: ______________________________ Keegan Olds, P.E.

Acting CIP Manager
Reviewed By: ______________________________ Fredy Castillo Senior Engineer
Reviewed By: ______________________________ Yasmin Lopez Purchasing Manager
Attest: ______________________________ Sylvia Edwards, City Clerk City of Corona, California
ONYX PAVING COMPANY, INC.

By: ______________________________ Signature ______________________________ Name ______________________________ Title ______________________________ License Number By: ______________________________ Signature ______________________________ Name ______________________________ Title Docusign Envelope ID: EB6AD4E2-6EAA-47E9-870F-CBEC24EB950C Docusign Envelope ID: 4C5CA85F-4A9A-4E17-8C52-32EBECA0B326