Expenditure Category Corona HGSD JCSD Norco Western Total Operations:

Treatment System $ 1,667,901 $ 646,867 $ 5,310,410 $ 2,067,623 $ 1,209,982 $ 10,902,783 Conveyance System 108,788 41,997 129,466 - 83,933 364,184 General & Administration 356,606 102,082 816,655 367,494 262,690 1,905,527 Total Operating Contributions $ 2,133,295 $ 790,946 $ 6,127,065 $ 2,564,583 $ 1,556,605 $ 13,172,494 Debt Service:

SRF Loan $ 1,903,189 $ 70,887 $ 2,064,704 $ 408,275 $ 39,481 $ 4,486,536 Capital:

Pay-go Capital Improvement Projects (1) $ 1,723,758 $ 493,437 $ 3,637,081 $ 1,766,091 $ 1,280,183 $ 8,900,550 Asset Replacement Reserve Funding 330,307 94,553 497,397 331,765 251,958 1,505,980 Total Capital Contributions $ 2,054,065 $ 587,990 $ 4,134,478 $ 2,097,856 $ 1,532,141 $ 10,406,530 Total Member Contributions $ 6,090,549 $ 1,449,823 $ 12,326,247 $ 5,070,714 $ 3,128,227 $ 28,065,560 Expenditure Category Corona HGSD JCSD Norco Western Total Operations:

Treatment System $ 1,844,323 $ 621,984 $ 5,181,896 $ 2,059,340 $ 1,124,510 $ 10,832,053 Conveyance System 140,520 45,549 147,116 - 96,939 430,124 General & Administration 305,392 87,421 699,372 314,717 224,965 1,631,867 Total Operating Contributions $ 2,290,235 $ 754,954 $ 5,881,268 $ 2,521,173 $ 1,446,414 $ 12,894,044 Debt Service:

SRF Loan $ 1,903,189 $ 70,887 $ 2,064,704 $ 408,275 $ 39,481 $ 4,486,536 Capital:

Pay-go Capital Improvement Projects $ 1,020,851 $ 292,224 $ 2,177,352 $ 1,046,699 $ 757,374 $ 5,294,500 Asset Replacement Reserve Funding 306,878 87,847 463,992 308,296 234,025 1,401,038 Total Capital Contributions $ 1,327,729 $ 380,071 $ 2,641,344 $ 1,354,995 $ 991,399 $ 6,695,538 Total Member Contributions $ 5,521,153 $ 1,205,912 $ 10,587,316 $ 4,284,443 $ 2,477,294 $ 24,076,118 Total Member Contribution YTY Change $ 569,396 $ 243,911 $ 1,738,931 $ 786,271 $ 650,933 $ 3,989,442 (1) $3.5M is carried over from FY24-25 Budget
Adopted Fiscal Year 2024-2025 Budget
WRCRWA Budget Schedule
Fiscal Year 2025-2026
Member Contribution Summary Year-to-Year Comparison
Proposed Fiscal Year 2025-2026 Budget
Capacity Contribution Capacity Contribution Capacity Contribution Total by Agency Corona 2.62 $ 990,525 2.62 $ 65,387 2.62 $ 356,606 $ 1,412,518 HGSD 0.75 $ 283,547 0.75 $ 18,718 0.75 $ 102,082 $ 404,347 JCSD 6.00 $ 2,268,377 - $ - 6.00 $ 816,655 $ 3,085,032
Norco 2.70 $ 1,020,770 2.50 $ 62,392 2.70 $ 367,494 $ 1,450,656 WMWD 1.93 $ 729,661 2.13 $ 53,158 1.93 $ 262,690 $ 1,045,509 Total 14.00 $ 5,292,880 8.00 $ 199,655 14.00 $ 1,905,527 $ 7,398,062 Est. Flows Rate Est. Flows Rate Est. Flows Rate Total by Agency Corona 1.10 $ 677,376 1.10 $ 43,401 - $ - $ 720,777
HGSD 0.59 $ 363,320 0.59 $ 23,279 - $ - $ 386,599
JCSD 4.94 $ 3,042,033 - $ - - $ - $ 3,042,033
Norco 1.70 $ 1,046,853 1.70 $ 67,074 - $ - $ 1,113,927
WMWD 0.78 $ 480,321 0.78 $ 30,775 - $ - $ 511,096
Total 9.11 $ 5,609,903 4.17 $ 164,529 - $ - $ 5,774,432 Grand Totals $ 10,902,783 $ 364,184 $ 1,905,527 $ 13,172,494 Fixed Rate per
MGD:
$31,505 $2,080 $11,342
Variable Rate
per MGD:
$1,687 $108 $0
Treatment System Conveyance System General & Administrative WRCRWA Budget Schedule
Fiscal Year 2025-2026
Capacity, Rates, and Contributions
Fixed and Variable
2024-2025 2025-2026
Budget Budget Amount % Change
Treatment System
Treatment Plant
Labor Costs 3,422,603 3,678,080 255,477 7.46%
Outside Services (Laboratory) 189,857 197,451 7,594 4.00% Facility Maintenance 1,557,268 1,828,065 270,797 17.39% Vehicles/Equipment Rental 171,130 183,904 12,774 7.46%
Utilities 2,462,936 2,000,000 (462,936) -18.80%
Chemicals 2,110,145 2,094,551 (15,594) -0.74%
Solids Disposal/Sludge 456,799 425,071 (31,728) -6.95%
Permits and Fees 154,302 160,474 6,172 4.00%
Facility Maintenance - Bldg & Yard 71,702 92,306 20,604 28.74% General Supplies 172,448 176,249 3,801 2.20%
Total Treatment Plant 10,769,190 10,836,151 66,961 0.62% Pre-treatment
Labor Costs 54,282 57,686 3,404 6.27%
Vehicle/Equipment Rental 2,714 2,884 170 6.26%
Laboratory - Quality Testing 4,867 5,062 195 4.01%
Supplies 1,000 1,000 - 0.00%
Total Pre-treatment 62,863 66,632 3,769 6.00%
Total Treatment System 10,832,053 10,902,783 70,730 0.65% Conveyance System
Labor Costs 211,702 145,870 (65,832) -31.10%
Facility Maintenance 79,564 82,747 3,183 4.00%
Vehicle/Equipment Rental 10,585 7,294 (3,291) -31.09%
Utilities 113,156 113,156 - 0.00%
Facility Maintenance - Bldg & Yard 5,117 5,117 - 0.00%
Supplies 10,000 10,000 - 0.00%
Total Conveyance System 430,124 364,184 (65,940) -15.33% General and Administration
Labor 531,578 640,423 108,845 20.48%
Outside Services (Consulting) 531,123 568,736 37,613 7.08% Insurance Expense 389,000 512,935 123,935 31.86%
Audit Expense 21,500 21,500 - 0.00%
Mercury Monitoring - SARDA 8,653 9,000 347 4.01%
Basin Monitoring Program 30,234 30,234 - 0.00%
Vehicle/Equipment Rental 26,579 32,021 5,442 20.47%
Bank Charges 5,540 5,540 - 0.00%
Permits and Fees 18,500 18,500 - 0.00%
General Supplies 11,960 12,438 478 4.00%
Legal Costs - General 57,200 54,200 (3,000) -5.24%
Total General and Administration 1,631,867 1,905,527 273,660 16.77% Total Operating Expenses 12,894,044 13,172,494 278,450 2.16% WRCRWA Budget Schedule
Fiscal Year 2025-2026
Year-to-Year Comparison
Change
Beginning Outstanding
SRF Loan Due Date
Member
Agency
Allocation
Percentage
Balance
7-01-2025 Interest Principal Payment
Balance
6-30-2026
Plant Expansion 12/31/2025 Corona 42.420% $ 21,741,141 $ 413,082 $ 1,490,107 $ 1,903,189 $ 20,251,034 HGSD 1.580% 809,784 15,386 55,501 70,887 754,283
JCSD 46.020% 23,586,216 448,138 1,616,566 2,064,704 21,969,650 Norco 9.100% 4,663,941 88,615 319,660 408,275 4,344,281 Western 0.880% 451,018 8,569 30,912 39,481 420,106
100.000% $ 51,252,100 $ 973,790 $ 3,512,746 $ 4,486,536 $ 47,739,354 SRF Loan maturity date: 12/31/2036
WRCRWA Budget Schedule
Fiscal Year 2025-2026
Debt Service Expenditures
Debt Service
Description
Pay-go Capital Improvement Projects Total Corona HGSD JCSD Norco Western Treatment System
Solar Dryer Discharge Conveyor 1,292,000 241,785 69,212 553,713 249,175 178,115 Blower Building Air Intake/Ventilation Modifications 371,000 69,429 19,874 159,000 71,551 51,146 Blower Replacement 1,200,000 224,568 64,284 514,284 231,432 165,432 Medium Voltage Switchgear 180,000 33,685 9,643 77,142 34,715 24,815 Dewatering Replacement 3,328,000 622,802 178,281 1,426,281 641,838 458,798 Generator Replacement 1,370,000 256,382 73,391 587,141 264,218 188,868 Primary Clarifier No. 2 Rehabilitation 500,000 93,570 26,785 214,285 96,430 68,930 InforFSM Implementation - WRCRWA's cost participation 245,550 45,952 13,154 105,235 47,357 33,852 Total Treatment System 8,486,550 1,588,173 454,624 3,637,081 1,636,716 1,169,956 Conveyance System
South Regional Pump Station (SRPS) Emergency Pump 214,000 70,085 20,063 - 66,875 56,977 WRCRWA Conveyance System Condition Assessment 200,000 65,500 18,750 - 62,500 53,250 Total Conveyance System 414,000 135,585 38,813 - 129,375 110,227 Total Pay-go Capital Improvement Project Contribution 8,900,550 1,723,758 493,437 3,637,081 1,766,091 1,280,183 Asset Replacement Reserve Funding Total Corona HGSD JCSD Norco WMWD Treatment System 1,160,597 217,194 62,173 497,397 223,833 160,000 Conveyance System 345,383 113,113 32,380 - 107,932 91,958 Total Asset Replacement Reserve Contribution 1,505,980 330,307 94,553 497,397 331,765 251,958 Total Capital Contributions $ 10,406,530 $ 2,054,065 $ 587,990 $ 4,134,478 $ 2,097,856 $ 1,532,141 WRCRWA Budget Schedule
Fiscal Year 2025-2026
Capital Budget
Agency Amounts to be Contributed
WRCRWA Pay-go Capital Improvement Projects Fiscal Year 2025-2026 Introduction
The WRCRWA Administrator is recommending approval and implementation of the following pay-go capital improvement projects for Fiscal Year 2025-2026.

1. Solar Dryer Discharge Conveyor

2. Blower Building Air Intake/Ventilation Modifications

3. Blower Replacement

4. Medium Voltage Switchgear

5. Dewatering Replacement

6. Generator Replacement

7. Primary Clarifier No. 2 Rehabilitation

8. InforFSM Implementation – WRCRWA’s Cost Participation

9. SRPS Emergency Pump

10. WRCRWA Conveyance System Condition Assessment
The capital projects are critical to the successful operation of the WRCRWA Wastewater Treatment Plant. The projects are described on the following pages.

WRCRWA Pay-go Capital Improvement Projects
Fiscal Year 2025-2026 Budget
Capital Project No. 1: Solar Dryer Discharge Conveyor
Allocation Treatment
Estimated Total Cost: $1,792,000
Budget Carryover from Fiscal Year 2024-2025 $1,292,000
Additional Budget Need in Fiscal Year 2025-2026 $0
Summary
The Solar Dryer Conveyor project consists of the replacement of four conveyors at the “dry end” of the Solar Dryer and modifying the discharge chute. These conveyors transfer the processed sludge from the solar drier into the sludge loadout building where they are discharged into semitrailers for offsite disposal.

Justification
This system is a single point of potential failure and needs to be fortified. During times of wetter solids, the current system conveys the wet solids to the end without much drying.

Background
The project consists of replacement of four conveyors at the “dry end” of the Solar Dryer. The conveyors on the “dry end” of the dryer that feed the truck loadout facility were sized for dryer solids. The solar dryer feed conveyors have sufficient capacity (provided the sludge is fairly dry, >50%). However, if dewatering equipment produces wetter solids, if a solar dryer bay is offline, or in periods of colder weather, wet solids could be conveyed from the wet end to the dry end without much drying occurring. Due to this potential, these conveyors should be replaced to allow for similar capacities as the “wet” feed conveyors. Also, the discharge chute at the end of the solar dryer needs to be modified to prevent solids bridging at times of the year.

It is recommended that with the replacement of the conveyance system, the chute should be modified to be wider and reduce the potential for “bridging” of solids above the conveyor.

Additionally, it is recommended to have spare motors and parts to keep this system running.

Schedule
Projected completion date for this project is by the end of Fiscal Year 2025-2026. Design contract has been awarded, and design is currently at the 90% phase. Completion of design is anticipated soon and will then be posted on Planet Bids for solicitation of bids for construction.

Once bids are received, we will be back before the Board for contract award.

WRCRWA Pay-go Capital Improvement Projects
Fiscal Year 2025-2026 Budget
Capital Project No. 2: Blower Building Air Intake/Ventilation Modifications Allocation: Treatment
Estimated Total Cost: $371,000
Budget Carryover from Fiscal Year 2024-2025 $371,000
Additional Budget Need in Fiscal Year 2025-2026 $0
Summary
Improve air exchanges in the blower building for blower operations.

Justification
The current blower building has limited ventilation filtration and no temperature controls.

During summer months blowers fail due to increase heat. To mitigate the heat, doors and windows are opened (to reduce heat), but dust is then introduced resulting in bearing failures.

Both heat and dust are to be addressed through this project.

Background
The blower building currently has no forced ventilation. As such, air is pulled into the room via the suction of the blowers that are in operation. The blower room has louvers with filters, but during warmer temperature periods, the room gets too hot for blower operation. To resolve this issue, the garage door is opened to cool the room. Opening this door, however, causes dust to enter the room which is causing operation issues with the blowers. It is recommended that a climate control system be installed to keep temperatures and dust in an acceptable range for blower operation.

This can be accomplished with a twofold approach as follows:

1. A combined intake plenum system should be incorporated to provide direct air feed to each of the blowers. This will be done by adding a plenum intake structure to the north of the building, including inlet filters. All blower intake air will pass through this structure and then ducting will be provided into the room to direct pre-filtered air to each of the blowers.

2. With the intake blower air separated from the room ventilation, either a cooling system using air conditioning or evaporative cooling can be used for the air in the room.

Thus, the blowers will have sufficient filtered air flow to each unit and the room will be cooled sufficiently to keep the electronics and motors cool enough to allow for normal and consistent operations.

Schedule
This project is planned to kick off in May 2025. It will run in concert with the Blower Replacement project as they are interconnected.

WRCRWA Pay-go Capital Improvement Projects
Fiscal Year 2025-2026 Budget
Capital Project No. 3: Blower Replacement
Allocation: Treatment
Estimated Total Cost: $1,500,000
Budget Carryover from Fiscal Year 2024-2025 $1,200,000
Additional Budget Need in Fiscal Year 2025-2026 $0
Summary
Replace three turbo blowers associated with the activated sludge process.

Justification
Over the past few years, WRCRWA has experienced failures of the existing HIS Turbo Blowers.

During the most recent failure we were made aware that HSI equipment is no longer supported, and replacement parts are non-existent.

Background
WRCRWA is currently equipped with five turbo blowers that support the aerobic biological process. These five blowers vary in age and manufacturer. In 2012 (or so), WRCRWA supplemented its aeration capacity within the oxidation ditch by adding diffuser grids and three turbo blowers. Those original three turbo blowers were manufactured by Houston Service Industries (HSI). HSI was subsequently purchased by Atlas Copco. During the 2017 plant expansion and addition of another biological reactor, two more turbo blowers were installed.

These two “newer” turbo blowers were manufactured by APG-Neuros.

Over the past few years, WRCRWA has experienced failures of the HSI blowers (typically related to the air bearings and dust). In 2023, HSI blower #2 experienced an electrical component failure and subsequent mechanical failure. Through this failure and attempted repair, Atlas Copco has notified WRCRWA that the HSI product line is no longer supported and that replacement parts are non-existent. Atlas Copco manufactures a similar product and as they replace existing HSI blowers, those used units and being scavenged for parts to make repairs on other HSI blowers.

WRCRWA is now faced with needing to replace the three HSI blowers (before failure) to ensure availability of adequate air in support of the biological processes. It is in WRCRWA’s best interest to investigate all blower technologies to ensure integration with the remaining two APG-Neuros blowers along with efficiency and ultimate biological air demands.

Schedule
This project has kicked off and design proposals have been received from two firms. Staff are currently evaluating the proposals and will be seeking contract award shortly. This project may span two fiscal years depending on equipment considerations and the availability of replacement equipment.

WRCRWA Pay-go Capital Improvement Projects
Fiscal Year 2025-2026 Budget
Capital Project No. 4: Medium Voltage Switchgear
Allocation: Treatment
Estimated Total Cost: $3,138,000
Budget Carryover from Fiscal Year 2024-2025 $180,000
Additional Budget Need in Fiscal Year 2025-2026 $0
Summary
Replace the medium voltage switchgear and place it in the existing electrical building.

Justification
The existing outdoor medium voltage switchgear is 26 years old and is becoming obsolete. It is due for replacement and should be relocated inside the newly built Electrical Building to provide a better environment conducive to such equipment.

Background
Due to the age of the gear and it being installed outdoors, it is recommended that this equipment be replaced to ensure it can be maintained and operated properly in the foreseeable future. A new electrical building has been constructed and the low voltage switchgear was moved into this building. There is room for a new medium voltage switchgear to be installed in this building also.

Depending on the outcome of the blower investigation, dewatering replacement study and low voltage load study, the medium voltage system might be impacted. The request would be for $190,000 during Fiscal Year 2024-2025 with replacement being in Fiscal Year 2026-2027. Design is anticipated to be complete during Fiscal Year 2025-2026.

Schedule
This project is planned to kick off in July 2025.

WRCRWA Pay-go Capital Improvement Projects
Fiscal Year 2025-2026 Budget
Capital Project No. 5: Dewatering Equipment Replacement Allocation: Treatment
Estimated Total Cost: $4,378,000
Budget Carryover from Fiscal Year 2024-2025 $265,500
Additional Budget Need in Fiscal Year 2025-2026 $3,062,500 Summary
Replace the three existing Andritz centrifuges.

Justification
Dewatering sludge is a critical component of biosolids management. Over the past few years, the Centrifuges at WRCRWA have experienced numerous failures resulting in decreased operating cycles. Limited dewatering capacity jeopardizes the treatment plant’s ability to maintain regulatory compliance.

Background
During the later stages of the plant expansion design, it was surfaced that the original centrifuges were outdated and no longer serviceable. The design team sought replacement equipment that would meet the needs of the facility while also fitting within the existing footprint of the original equipment. Andritz centrifuges were selected and installed during the plant expansion.

While the existing Andritz centrifuges have met the needs of the facility, they are being pushed to their limits. The centrifuges are being ran at the far end of their speed rating to achieve decent % solids concentration while maintaining desirable centrate quality. The units are being stressed resulting in reduced component life and increasingly sever failures.

With the units suffering a higher rate of mechanical breakdown, very rarely do we have three units available. This has resulted in increased run times for the other two units available. An investigation of best available technologies and based on current WRCRWA sludge conditions, staff recommend replacing the existing centrifuges to gain greater operational redundancy and productivity.

During Fiscal Year 2025-2026, the ask is for $3,062,500.

Schedule
This project has kicked off and design proposals have been received from two firms. Staff are currently evaluating the proposals and will be seeking contract award shortly. This project may span two fiscal years depending on equipment considerations and the availability of replacement equipment.

WRCRWA Pay-go Capital Improvement Projects
Fiscal Year 2025-2026 Budget
Capital Project No. 6: Emergency Generator Replacement
Allocation: Treatment
Estimated Total Cost: $2,740,000
Budget Carryover from Fiscal Year 2024-2025 $0
New Budget Need in Fiscal Year 2025-2026 $1,370,000
Summary
Replace the existing treatment plant emergency generator.

Justification
Generator age as well as various component failures over the 26-year period help drive the need for asset replacement consideration.

Background
WRCRWA is equipped with an emergency stand-by generator to provide power to the plant processes should the need arise. The existing Caterpillar brand stand-by plant generator houses a TIER 2 engine that is 26 years old. PSP, weather, accidental and routine power outages have been a recurring theme at the WRCRWA plant. This uncertainty coupled with asset depreciation accompanies a level of risk for our stand-by power reliance. Generator age as well as various component failures over the 26-year period help drive the need for asset replacement consideration. From a risk and resilience perspective, this unit presents a higher potential for failure. Additionally, the emissions rating is very low when compared to the SCAQMD best available technology today (TIER 4F engines).

During Fiscal Year 2025-2026, the ask is for $1,370,000.

Schedule
This project is planned to kick off in July 2025. In recent discussions with Caterpillar, replacement generators have a lead-time greater than 52 weeks. Our intention is to perform a load study to understand potential future energy demands (associated with dewatering equipment and upsizing of blowers) then solicit proposals for the generator replacement. This project will span two fiscal years based on equipment availability.

WRCRWA Pay-go Capital Improvement Projects
Fiscal Year 2025-2026 Budget
Capital Project No. 7: Primary Clarifier No. 2 Rehabilitation Allocation: Treatment
Estimated Total Cost: $500,000
Budget Carryover from Fiscal Year 2024-2025 $0
New Budget Need in Fiscal Year 2025-2026 $500,000
Summary
Rehabilitate Primary Clarifier No. 2
Justification
Primary clarifier removes the lighter materials that float to the top such as fats, oil and grease (FOG) as well as heavier materials that sink to the bottom (sludge). FOG and the sludge collected from the primary clarifier are conveyed to the anaerobic digesters for additional stabilization. A primary clarifier is considered the most energy efficient way to remove the biochemical oxygen demand of the wastewater, lessening the energy load on downstream processes such as bioreactors and blower systems. Maintaining the primary clarifiers in well-functioning order would reduce the overall energy footprint of the plant as well as increase the likelihood of maintaining NPDES and AQMD permit compliance.

Background
Primary Clarifier No. 2 is one of two 95-feet diameter primary clarifiers that were constructed in 2017 and has been in service for 8 years. During a routine preventative maintenance inspection after cleaning, the staff discovered a substantial level of corrosion on the sludge collection arms, scum baffle and center supporting ring. A consultant was hired to document the existing condition and to validate staff observations. Staff, along with the consultant, recommend rehabilitating Primary Clarifier No. 2 which consists of repairing/replacing corroded structural members of the sludge collection system, center ring, and scum baffle along with sandblasting and recoating all steel elements.

During the Fiscal Year 2025-2026, the ask is for $500,000.

Schedule
The project is planned to kick off in July 2025.

WRCRWA Pay-go Capital Improvement Projects
Fiscal Year 2025-2026 Budget
Capital Project No. 8: InforFSM Implementation – WRCRWA’s Cost Participation Allocation: Treatment
Estimated Total Cost: $245,550
Budget Carryover from Fiscal Year 2024-2025 $0
New Budget Need in Fiscal Year 2025-2026 $245,550
Summary
WRCRWA’s allocated share of costs related to the implementation of the financial software Infor Cloud Suite Financials (InforFSM).

Justification
In Fiscal Year 2024, Western Municipal Water District (WMWD), WRCRWA’s administrator, successfully implemented the new financial software, InforFSM, in anticipation of the discontinuation of support for the existing Lawson Version 10 system by its developer in early 2026. Since WRCRWA also uses the same financial software, it is necessary for WRCRWA to share in the implementation cost alongside WMWD.

Background
In June 2019, Western Municipal Water District (WMWD) began the search for a replacement for its financial software due to the upcoming discontinuation of support for Lawson Version 10 after April 2026, along with the cessation of support from Microsoft Server in October 2023. In August 2022, WMWD selected Infor CloudSuite Financials, a subscription-based, multi-tenant software platform, as the new system. The implementation of InforFSM commenced in late 2022 and successfully went live on April 29, 2024.

Since WRCRWA also uses the same financial software platform, it is necessary for WRCRWA to participate in the implementation costs alongside WMWD. The total cost of the InforFSM project implementation is $3,277,045, with WRCRWA’s share amounting to $245,550, or 7.49%, based on the ratio of WRCRWA’s Fiscal Year 2023–2024 operating expense budget compared to that of WMWD.

Schedule
The project has been completed. WMWD is seeking reimbursement from WRCRWA in Fiscal Year 2025-2026.

WRCRWA Pay-go Capital Improvement Projects
Fiscal Year 2025-2026 Budget
Capital Project No. 9: South Regional Pump Station (SRPS) Emergency Pump Allocation: Conveyance
Estimated Total Cost: $1,000,000
Budget Carryover from Fiscal Year 2024-2025 $214,000
Additional Budget Need in Fiscal Year 2025-2026 $0
Summary
Design, purchase, and installation of a standalone diesel bypass pump at the SRPS.

Justification
Currently there is no back up power at the SRPS. By design, in the event of a power outage, the wet well fills and if power is not restored quickly, raw sewage overflows into the Inland Empire Brine Line (Brine Line). Numerous improvements and upgrades have been implemented at the SRPS and WRCRWA Treatment Plant since 2016 to increase the overall system redundancy and reliability. The goal of the improvements/upgrades are to prevent future sewage overflow into the Brine Line located adjacent to the SRPS.

Initially, installation of a standalone diesel bypass pump was considered as it would provide additional redundancy and reliability to the sewage collection system. The pump would allow WRCRWA to maintain independent hydraulic control in the event of mechanical and/or electrical equipment failures at SRPS allowing the SRPS to continue to pump flows to the WRCRWA Treatment Plant rather than discharging them to the Brine Line. However, due to design parameters and FEMA special requirements, the available bypass pump was found to be inadequate, leading to the selection of a permanent generator as the most cost-effective alternative solution.

Background
The SRPS serves the City of Riverside, Home Gardens, City of Norco, and City of Corona by pumping wastewater from these cities just over three miles to the WRCRWA Treatment Plant.

Average daily pumping flow is 3 MGD.

Orange County Sanitation recently objected to un-planned and unnoticed sewage flows in the Brine Line and added a requirement to the Santa Ana Watershed Project Authority’s (SAWPA) discharge permit that required development of a plan to incorporate robust redundancies to prevent discharges to the Brine Line.

The WRCRWA Treatment Plant was designed to rely on the Brine Line and ultimately Orange County Sanitation District as a back-up if there were problems that WRCRWA’s system could not handle. This option provides for redundancy against failure due to electrical issues.

However, after exhaustive analyses, the preliminary design revealed that the previously selected emergency bypass diesel engine pump did not meet the project’s design parameters. As a WRCRWA Pay-go Capital Improvement Projects
Fiscal Year 2025-2026 Budget
result, a permanent generator has been chosen as the most feasible and cost-effective alternative.

Schedule
A grant was awarded on February 3, 2023, from the Hazard Mitigation Grant Program in the amount of up to $938,349 which was initially estimated to cover up to 75 percent of the design, purchase, and installation costs for an emergency bypass diesel engine pump.

A grant application for additional funds to support the emergency generator is in progress.

Additionally, staff are in the process of securing an extension and seeking additional grant funding to address the increasing cost of construction, equipment and material.

The expected completion date for the project was originally in Fall of 2025. However, due to the change of the scope of work, the expected completion date is currently unknown.

WRCRWA Pay-go Capital Improvement Projects
Fiscal Year 2025-2026 Budget
Capital Project No. 10: WRCRWA Conveyance System Condition Assessment Allocation: Conveyance
Estimated Total Cost: $200,000
Budget Carryover from Fiscal Year 2024-2025 $0
New Budget Need in Fiscal Year 2025-2026 $200,000
Summary
Western Riverside County Regional Wastewater Authority (WRCRWA), under the administrative authority of Western Municipal Water District (WMWD), is requesting a field condition assessment of the WRCRWA wastewater treatment sewer conveyance system pipeline segments and manholes from the Arizona flume to the South Regional Pump Station notwithstanding any related siphons or force mains.

Justification
To protect system operations, maintain regulatory compliance related to the Sewer System Management Plan, and to ensure that WRCRWA is capable of forecasting asset failures as well as establishing appropriate asset replacement reserves, WRCRWA will evaluate, and as well as grade, based on field evaluation, the existing asset condition for 6.8 miles of shared sewage trunk line segments and manholes.

Background
As part of the linear asset management program, condition assessments are required to meet compliance requirements, understand current needs and prepare for future costs. This conveyance system has never had formal condition assessment. This bassline information will provide member agencies with a clear understanding of the maintenance system.

Schedule
This project is scheduled for public bidding in June with work to commence in July of 2025.

Anticipated completion is 6 months contingent on associated bids.

WRCRWA
Asset Replacement Funding Need Analysis for FY 2025-2026 Budget Conveyance System
2024-2025 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 2030-2031 2031-2032 2032-2033 2033-2034 2034-2035 10 Yr Total Reserve Bal as of 7/1/24 1,203,501 524,077 413,681 573,419 356,356 515,965 666,523 989,868 1,258,223 1,117,198 1,442,764 Funding Need 318,384 345,383 345,383 345,383 345,383 345,383 345,383 345,383 345,383 345,383 345,383 3,453,830 Spending (997,808) (455,779) (185,645) (562,446) (185,774) (194,825) (22,038) (77,028) (486,408) (19,817) (788,067) (2,977,827) Projected Reserve $ 524,077 $ 413,681 $ 573,419 $ 356,356 $ 515,965 $ 666,523 $ 989,868 $ 1,258,223 $ 1,117,198 $ 1,442,764 $ 1,000,080 Treatment System
2024-2025 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 2030-2031 2031-2032 2032-2033 2033-2034 2034-2035 10 Yr Total Reserve Bal as of 7/1/24 2,990,511 3,604,683 4,071,128 4,042,142 4,156,195 4,867,095 4,716,959 4,657,146 225,538 1,205,766 2,287,284 Funding Need 1,082,654 1,160,597 1,160,597 1,160,597 1,160,597 1,160,597 1,160,597 1,160,597 1,160,597 1,160,597 1,160,597 11,605,970 Spending (468,482) (694,152) (1,189,583) (1,046,544) (449,697) (1,310,733) (1,220,410) (5,592,205) (180,369) (79,079) (1,947,199) (13,709,971) Projected Reserve $ 3,604,683 $ 4,071,128 $ 4,042,142 $ 4,156,195 $ 4,867,095 $ 4,716,959 $ 4,657,146 $ 225,538 $ 1,205,766 $ 2,287,284 $ 1,500,682 Projected Cash Availability $ 4,128,760 $ 4,484,809 $ 4,615,561 $ 4,512,551 $ 5,383,060 $ 5,383,482 $ 5,647,014 $ 1,483,761 $ 2,322,964 $ 3,730,048 $ 2,500,762 \\Wmwd-fsmain\WRCRWA\Capital\Budget\FY26 Capital Project Budget Projection with Asset Replacement

WRCRWA ASSET REPLACEMENT SCHEDULE
Conveyance System

ASSET ID DESCRIPTION ASSET CLASS INSTALLED DATE

ESTIMATED

REPLACEMENT YEAR

ESTIMATED ASSET

REPLACEMENT COST
SLS9000000006 Rolling Entry Gates MISC. ASSETS 1995 2026 $ 103,970.92 SLS9000000010 Piping Pit / Electrical Conduit MISC. ASSETS 1996 2026 77,243.79 xxx9000000021 Wet Well Exhaust Fan FAN 1995 2026 6,044.71 xxx9000000028 Interior Lighting MISC. ASSETS 1996 2026 38,416.53 xxx9000000030 Exterior Lighting MISC. ASSETS 1996 2026 68,037.01 xxx9000000034 Corrosion Control Chemical Tank FLUID STORAGE UNIT 1996 2026 162,066.49 SLS9000000007 Fencing MISC. ASSETS 1995 2027 101,292.06 SLS9000000013 Wet Well Equalization Slide Gate MISC. ASSETS 1995 2027 79,827.09 xxx9000000031 Eye Wash and Shower Station MISC. ASSETS 2019 2027 4,525.55 SLS9000000003 North Wet Well Slide Gate MISC. ASSETS 1995 2028 92,767.05 SLS9000000005 South Wet Well Slide Gate MISC. ASSETS 1995 2028 92,767.05 SLS9000000014 Pavement MISC. ASSETS 1995 2028 174,465.21 SVALVE0000000196 12" Isolation Valve - P1 SEWER VALVE 1995 2028 33,866.29 SVALVE0000000197 12" Isolation Valve - P2 SEWER VALVE 1995 2028 33,866.29 SVALVE0000000198 12" Isolation Valve - P3 SEWER VALVE 1995 2028 33,866.29 SVALVE0000000199 12" Isolation Valve - P4 SEWER VALVE 1995 2028 33,866.29 xxx9000000035 Bridge Crane Electrical & Mechanical CRANE 2018 2028 66,981.93 SHMOTOR0000000220 Submersible P3 (Motor) MOTOR 2019 2029 46,443.46 SHMOTOR0000000221 Submersible P4 (Motor) MOTOR 2019 2029 46,443.46 SPUMP0000000223 Submersible P3 (Pump) SEWER PUMP 2019 2029 46,443.46 SPUMP0000000224 Submersible P4 (Pump) SEWER PUMP 2019 2029 46,443.46 SHMOTOR0000000218 Submersible P1 (Motor) MOTOR 2020 2030 46,661.82 SHMOTOR0000000219 Submersible P2 (Motor) MOTOR 2020 2030 46,661.82 SPUMP0000000221 Submersible P1 (Pump) SEWER PUMP 2020 2030 46,661.82 SPUMP0000000222 Submersible P2 (Pump) SEWER PUMP 2020 2030 46,661.82 xxx9000000037 North Wet Well Monitoring System INSTRUMENT 2020 2030 8,177.25 FACHVAC0000000072 HVAC System HVAC 2016 2031 22,038.46
xxx9000000032 Distribution Panel SGMCC 1995 2032 49,655.14 xxx9000000033 Distribution Panel LP1 SGMCC 1995 2032 18,965.89 xxx9000000038 South Wet Well Monitoring System INSTRUMENT 2022 2032 8,406.63 \\Wmwd-fsmain\WRCRWA\Budget\BUDGET 2025-2026\Budget Binder\Asset Replacement Page 1

WRCRWA ASSET REPLACEMENT SCHEDULE
Conveyance System

ASSET ID DESCRIPTION ASSET CLASS INSTALLED DATE

ESTIMATED

REPLACEMENT YEAR

ESTIMATED ASSET

REPLACEMENT COST
SLS50000 Wet Well Recoating STRUCTURE 1998 2033 486,408.37 SHCRANE0000000006 Bridge Crane CRANE 2023 2034 19,817.38 xxx9000000036 Motor Control Center (MCC) SGMCC 1995 2035 652,373.59 xxx9000000039 Transformer CONTROL PANEL 1995 2035 135,693.27 $ 2,977,827.62
\\Wmwd-fsmain\WRCRWA\Budget\BUDGET 2025-2026\Budget Binder\Asset Replacement Page 2

WRCRWA ASSET REPLACEMENT SCHEDULE
Treatment System

ASSET ID DESCRIPTION ASSET CLASS

ESTIMATED

REPLACEMENT YEAR REPLACEMENT COST
SHFAN0000000071 Odor Control System Scrubber 4 Exhaust Fan ODOR REDUCTION UNIT 2026 14,256.37 $ SHFAN0000000072 Odor Control System Scrubber 5 Exhaust Fan ODOR REDUCTION UNIT 2026 14,256.37 SHFAN0000000073 Odor Control System Scrubber 6 Exhaust Fan ODOR REDUCTION UNIT 2026 14,256.37 SHGEARDRV0000000017 Sludge Screw Conveyor Gear Box 5 GEAR DRIVE UNIT 2026 65,454.81 SHGEARDRV0000000018 Sludge Screw Conveyor Gear Box 6 GEAR DRIVE UNIT 2026 65,454.81 SPUMP0000000013 Submersible Storm Drain P2 SEWER PUMP 2026 33,408.96 SPUMP0000000025 Progressive Cavity Drum Thickener Sludge MISC. ASSETS 2026 31,383.53 SPUMP0000000143 Submersible Scum P2 SEWER PUMP 2026 20,920.09 SPUMP0000000144 Submersible Chopper Centrate P1 SEWER PUMP 2026 31,907.51 SPUMP0000000145 Submersible Chopper Centrate P2 SEWER PUMP 2026 31,907.51 SPUMP0000000183 Progressive Cavity Flash Mix Polymer Chem Feed P2 CHEMICAL FEED 2026 34,472.57 SPUMP0000000188 Submersible Drain Pump Station P1 SEWER PUMP 2026 46,373.28 SPUMP0000000189 Submersible Drain Pump Station P2 SEWER PUMP 2026 46,373.28 SPUMP0000000190 Submersible Drain Pump Station P3 SEWER PUMP 2026 46,373.28 SPUMP0000000191 Thickener Poly Chem Feed CHEMICAL FEED 2026 31,383.53 SPUMP0000000192 Progressive Cavity Poly Recirc P1 CHEMICAL FEED 2026 31,383.53 SPUMP0000000193 Progressive Cavity Chem Feed Poly Recirc P2 CHEMICAL FEED 2026 31,383.53 WPUMP0000000118 Peristaltic P1 SEWER PUMP 2026 33,408.96 WPUMP0000000119 Peristaltic P2 SEWER PUMP 2026 34,896.94 WPUMP0000000120 Peristaltic P3 SEWER PUMP 2026 34,896.94 SGRINDER0000000010 Grinder - No. 2 West Muffin Monster GRINDER 2027 19,035.61 SHBLWR0000000001 Blower Turbine No. 1 BLOWER 2027 257,553.18 SHBLWR0000000002 Blower Turbine No. 2 BLOWER 2027 257,553.18 SHGEARDRV0000000019 Sludge Screw Conveyor Gear Box 7 GEAR DRIVE UNIT 2027 67,635.77 SHGEARDRV0000000020 Sludge Screw Conveyor Gear Box 8 GEAR DRIVE UNIT 2027 67,635.77 SHGEARDRV0000000021 Sludge Screw Conveyor Gear Box 9 GEAR DRIVE UNIT 2027 67,635.77 SHINSTRUM0000000003 Conductivity Analyzer INSTRUMENT 2027 15,843.51 SHINSTRUM0000000013 ProSonic Meter Digester No. 1 (solids) DIGESTER GAS SYSTEM 2027 27,015.85 SHINSTRUM0000000014 ProSonic Meter Digester No. 2 (solids) DIGESTER GAS SYSTEM 2027 27,015.85 SHINSTRUM0000000021 Conductivity Analyzer INSTRUMENT 2027 33,458.54 SHINSTRUM0000000024 pH Analyzer INSTRUMENT 2027 33,458.54 SHINSTRUM0000000114 Influent pH & Conductivity Meter METER 2027 33,458.54 \\Wmwd-fsmain\WRCRWA\Budget\BUDGET 2025-2026\Budget Binder\Asset Replacement Page 1

WRCRWA ASSET REPLACEMENT SCHEDULE
Treatment System

ASSET ID DESCRIPTION ASSET CLASS

ESTIMATED

REPLACEMENT YEAR REPLACEMENT COST
SHINSTRUM0000000115 Bench Service in Lab Meter Testing Equip INSTRUMENT 2027 31,920.98 SHINSTRUM0000000116 Bench Service in Lab Meter Testing Equip INSTRUMENT 2027 31,920.98 SMIXER0000000001 Anoxic East Mixer No. 1 (Wall Mount) MIXER 2027 16,003.33 SMIXER0000000002 Anoxic West Mixer No. 2 (Wall Mount) MIXER 2027 16,003.33 SPUMP0000000004 Submersible Scum P2 SEWER PUMP 2027 17,498.05 SPUMP0000000142 Submersible Scum P1 SEWER PUMP 2027 20,969.67 SPUMP0000000202 Centri Chlorine Contact Basin Ch. 4 Influent Sample INSTRUMENT 2027 22,642.53 SPUMP0000000204 Centri Chlorine Contact Basin Effluent Sample INSTRUMENT 2027 20,336.19 WPUMP0000000121 Peristaltic P4 SEWER PUMP 2027 34,996.10 WPUMP0000000122 Peristaltic P5 SEWER PUMP 2027 34,996.10 WPUMP0000000123 Peristaltic P6 SEWER PUMP 2027 34,996.10 PLGRITCHMB0000000001 Grit Chamber GRIT CHAMBER 2028 337,084.09 SHGEARDRV0000000014 Sludge Screw Conveyor Gear Box 2 GEAR DRIVE UNIT 2028 67,840.69 SHMOTOR0000000002 Surface Aerator Motor MOTOR 2028 249,119.69 SPUMP0000000018 Progressive Cavity Centrifuge 1 Feed CENTRIFUGE 2028 19,138.07 SPUMP0000000096 Peristaltic Alum Chem Feed P1 CHEMICAL FEED 2028 32,715.37 SPUMP0000000097 Peristaltic Alum Chem Feed P2 CHEMICAL FEED 2028 32,715.37 SPUMP0000000168 Peristaltic Sodium Hypochlorite Chem Feed P1 CHEMICAL FEED 2028 33,509.77 SPUMP0000000169 Peristaltic Sodium Hypochlorite Chem Feed P2 CHEMICAL FEED 2028 33,509.77 SPUMP0000000170 Peristaltic Bisulfite Chem Feed P1 CHEMICAL FEED 2028 33,509.77 SPUMP0000000171 Peristaltic Bisulfite Chem Feed P2 CHEMICAL FEED 2028 33,509.77 SPUMP0000000172 Peristaltic Bisulfite Chem Feed P3 CHEMICAL FEED 2028 33,509.77 SPUMP0000000197 Centri Chlorine Contact Basin Ch. 1 Influent Sample INSTRUMENT 2028 23,396.98 SPUMP0000000198 Centri Chlorine Contact Basin Ch. 2 Effluent Sample INSTRUMENT 2028 23,396.98 SPUMP0000000199 Centri Chlorine Contact Basin Ch. 2 Influent Sample INSTRUMENT 2028 23,396.98 SPUMP0000000200 Centri Chlorine Contact Basin Ch. 3 Influent Sample INSTRUMENT 2028 23,396.98 SPUMP0000000201 Centri Chlorine Contact Basin Ch. 3 Effluent Sample INSTRUMENT 2028 23,396.98 SPUMP0000000203 Centri Chlorine Contact Basin Ch. 4 Effluent Sample INSTRUMENT 2028 23,396.98 PLCONVEYOR50000 Screw Conveyor No. 1 Cake - Liner CONVEYOR 2029 10,057.41 PLCONVEYOR50001 Screw Conveyor No. #2 Elevating - Liner CONVEYOR 2029 19,907.79 PLCONVEYOR50002 Screw Conveyor No. #3 Elevating - Liner CONVEYOR 2029 19,907.79 PLCONVEYOR50003 Screw Conveyor No. #4 North - Liner CONVEYOR 2029 19,907.79 \\Wmwd-fsmain\WRCRWA\Budget\BUDGET 2025-2026\Budget Binder\Asset Replacement Page 2

WRCRWA ASSET REPLACEMENT SCHEDULE
Treatment System

ASSET ID DESCRIPTION ASSET CLASS

ESTIMATED

REPLACEMENT YEAR REPLACEMENT COST
PLCONVEYOR50004 Screw Conveyor No. #5 South - Liner CONVEYOR 2029 19,907.79 SHGEARDRV0000000013 Sludge Screw Conveyor Gear Box 1 GEAR DRIVE UNIT 2029 68,052.45 SHINSTRUM0000000004 pH & T Analyzer INSTRUMENT 2029 14,410.12 SHINSTRUM0000000028 Nonpotable Water Analyzer INSTRUMENT 2029 33,562.71 SHINSTRUM0000000029 Nonpotable Water Analyzer INSTRUMENT 2029 33,562.71 SHINSTRUM0000000030 Effluent Analyzer INSTRUMENT 2029 33,562.71 SHINSTRUM0000000106 Effluent Turbidity Meter METER 2029 33,562.71 SHINSTRUM0000000107 Conductivity Meter METER 2029 33,562.71 SHINSTRUM0000000108 Effluent Turbidity Meter METER 2029 33,562.71 SHINSTRUM0000000112 Filter Turbidity Meter METER 2029 33,562.71 SPUMP0000000195 Centri Chlorine Contact Basin Influent Sample INSTRUMENT 2029 18,430.51 SPUMP0000000196 Centri Chlorine Contact Basin Ch. 1 Effluent Sample INSTRUMENT 2029 24,176.57 PLCLARIF0000000012 Primary Clarifier No. 1 - (Coating ?) CLARIFIER 2030 371,271.91 PLCLARIF0000000013 Primary Clarifier No. 2 - (Coating ?) CLARIFIER 2030 371,271.91 SHBLWR0000000003 Blower Turbine No. 3 BLOWER 2030 245,252.69 SHGEARDRV0000000015 Sludge Screw Conveyor Gear Box 3 GEAR DRIVE UNIT 2030 68,271.26 SHINSTRUM0000000109 pH & Conductivity Meter METER 2030 35,313.84 SHINSTRUM0000000110 pH & Conductivity Meter METER 2030 35,313.84 SHINSTRUM0000000111 Effluent Meter METER 2030 35,313.84 SHINSTRUM0000000113 Oxi Ditch Turbidity Meter METER 2030 33,617.41 SPUMP0000000006 RAS P2 Pump SEWER PUMP 2030 76,723.42
SPUMP0000000179 Polymer Centrifuge Feed P1 CHEMICAL FEED 2030 12,794.22 SPUMP0000000180 Polymer Centrifuge Feed P2 CHEMICAL FEED 2030 12,794.22 SPUMP0000000181 Polymer Centrifuge Feed P3 CHEMICAL FEED 2030 12,794.22 Not in Infor/ To Be Added Major HMI (Cent_Blower_Waste) CONTROL PANEL 2031 22,308.62 SHFAN0000000074 Odor Control System Foul Air Fan ODOR REDUCTION UNIT 2031 18,548.08 SHMOTOR0000000127 Centri Chlorine Contact Basin Non Potable P3 Motor MOTOR 2031 44,617.25 SHMOTOR0000000179 Standard Flash Mix Pump Motor MOTOR 2031 41,111.33 SMIXER0000000003 Submersible Anoxic Basin Bioreactor No. 1 Mixer No. 1 MIXER 2031 39,358.37 SMIXER0000000004 Submersible Anoxic Basin Bioreactor No. 1 Mixer No. 2 MIXER 2031 39,358.37 SMIXER0000000005 Submersible Anoxic Basin Bioreactor No. 1 Mixer No. 3 MIXER 2031 39,358.37 SMIXER0000000006 Submersible Aerobic Basin Bioreactor No. 1 Mixer No. 1 MIXER 2031 39,358.37 \\Wmwd-fsmain\WRCRWA\Budget\BUDGET 2025-2026\Budget Binder\Asset Replacement Page 3

WRCRWA ASSET REPLACEMENT SCHEDULE
Treatment System

ASSET ID DESCRIPTION ASSET CLASS

ESTIMATED

REPLACEMENT YEAR REPLACEMENT COST
SMIXER0000000007 Submersible Aerobic Basin Bioreactor No. 1 Mixer No. 2 MIXER 2031 39,358.37 SMIXER0000000008 Submersible Aerobic Basin Bioreactor No. 1 Mixer No. 3 MIXER 2031 39,358.37 SMIXER0000000009 Submersible Aerobic Basin Bioreactor No. 1 Mixer No. 4 MIXER 2031 39,358.37 SPUMP0000000140 Centri Hot Water Recirc P1 DIGESTER GAS SYSTEM 2031 22,308.62 SPUMP0000000141 Centri Hot Water Recirc P2 DIGESTER GAS SYSTEM 2031 22,308.62 SPUMP0000000146 Centri Sludge Recirc P1 SEWER PUMP 2031 12,907.27 SPUMP0000000147 Centri Sludge Recirc P2 SEWER PUMP 2031 12,907.27 SPUMP0000000155 Odor Control Scrubber Control Box Chem Feed Stage 2 Caustic Soda Pump ODOR REDUCTION UNIT 2031 22,308.62 SPUMP0000000156 Odor Control Scrubber Control Box Chem Feed Stage 3 Caustic Soda Pump ODOR REDUCTION UNIT 2031 22,308.62 SPUMP0000000159 Bio-Reactor 2 Axial Flow P1 SEWER PUMP 2031 39,358.37 SPUMP0000000160 Bio-Reactor 2 Axial Flow P2 SEWER PUMP 2031 39,358.37 SPUMP0000000161 Odor Control Scrubber Control Box Stage 1 Recirc ODOR REDUCTION UNIT 2031 22,308.62 SPUMP0000000162 Odor Control Scrubber Control Box Stage 2 Recirc P1 ODOR REDUCTION UNIT 2031 22,308.62 SPUMP0000000163 Odor Control Scrubber Control Box Stage 2 Recirc P2 ODOR REDUCTION UNIT 2031 22,308.62 SPUMP0000000164 Odor Control Scrubber Control Box Stage 2 Recirc P3 ODOR REDUCTION UNIT 2031 22,308.62 SPUMP0000000165 Odor Control Scrubber Control Box Stage 3 Recirc P1 ODOR REDUCTION UNIT 2031 22,308.62 SPUMP0000000166 Odor Control Scrubber Control Box Stage 3 Recirc P2 ODOR REDUCTION UNIT 2031 22,308.62 SPUMP0000000205 Centri Dichlorination Contact Basin Sample MOTOR 2031 41,111.33 SPUMP0000000206 Centri Chlorine Contact Basin Post Aeration Effluent Sample INSTRUMENT 2031 44,617.25 SPUMP0000000208 Centri Chlorine Contact Basin Non Potable P2 WATER PUMP 2031 94,927.65 SPUMP0000000209 Centri Chlorine Contact Basin Non Potable P3 WATER PUMP 2031 94,927.65 SPUMP0000000210 Centri Chlorine Contact Basin Non Potable P4 WATER PUMP 2031 44,617.25 SPUMP0000000211 Chlorine Contact Basin Recycled Lift Pump P1 SEWER PUMP 2031 100,230.02 SPUMP0000000212 Chlorine Contact Basin Recycled Lift Pump P2 SEWER PUMP 2031 70,267.06 COMPLX50003 Gate and Fence STRUCTURE 2032 238,656.57
Not in Infor/ To Be Added Major HMI (Cent_Blower_Waste) CONTROL PANEL 2032 630,470.71 PLAERATOR0000000004 Digester 1-1 Aerator DIGESTER 2032 66,587.28 PLAERATOR0000000005 Digester 1-2 Aerator DIGESTER 2032 66,587.28 PLAERATOR0000000006 Digester 2-3 Aerator DIGESTER 2032 66,587.28 PLAERATOR0000000007 Digester 2-4 Aerator DIGESTER 2032 66,587.28 SHFAN0000000028 Biofilter Foul Air Exhaust Fan MOTOR 2032 13,024.09 SHINSTRUM0000000005 Grit Bin Analyzer INSTRUMENT 2032 16,853.53 \\Wmwd-fsmain\WRCRWA\Budget\BUDGET 2025-2026\Budget Binder\Asset Replacement Page 4

WRCRWA ASSET REPLACEMENT SCHEDULE
Treatment System

ASSET ID DESCRIPTION ASSET CLASS

ESTIMATED

REPLACEMENT YEAR REPLACEMENT COST
SHINSTRUM0000000006 Screenings Bin Analyzer INSTRUMENT 2032 16,853.53 SHINSTRUM0000000007 Bar Screen Analyzer INSTRUMENT 2032 16,853.53 SHINSTRUM0000000008 Endress ProSonic Meter INSTRUMENT 2032 16,853.53 SHINSTRUM0000000009 Endress ProSonic Meter INSTRUMENT 2032 18,664.90 SHINSTRUM0000000015 TWAS Pit Level Meter INSTRUMENT 2032 18,664.90 SHINSTRUM0000000016 Endress Caustic Level Meter INSTRUMENT 2032 18,664.90 SHMOTOR0000000011 Inverter Duty Secondary WAS P1 Spare Motor MOTOR 2032 19,532.22 SHMOTOR0000000100 Biofilter Recirculation Pump Motor SEWER PUMP 2032 31,826.79 SHMOTOR0000000124 Centri Hot Water Booster Pump Motor DIGESTER GAS SYSTEM 2032 13,024.09 SHSGMCC0000000046 MCC 1M (Headworks) SGMCC 2032 630,470.71 SHSGMCC0000000049 MCC 4M (Chemical Building) SGMCC 2032 253,187.57 SHSGMCC0000000050 MCC 5M (Solids Building) SGMCC 2032 253,187.57 SHSGMCC0000000047 MCC 2M (Oxidation Ditch) SGMCC 2032 830,966.99 SHSGMCC0000000048 MCC 3M (Secondary Clarifier) SGMCC 2032 830,966.99 SHSGMCC0000000080 MCC 3MA (RAS) SGMCC 2032 830,966.99
SODORRED0000000008 Biofilter FILTER 2032 29,109.74
SPUMP0000000007 RAS P3 Pump SEWER PUMP 2032 76,953.29
SPUMP0000000120 Submersible Wet Well P1 SEWER PUMP 2032 48,818.13 SPUMP0000000150 Centrifugal Biofilter Irrigation Recirc Pump SEWER PUMP 2032 30,015.43 SPUMP0000000153 Odor Control Scrubber 3 Chem Feed Stage 2 Hydrogen PeroxideODOR REDUCTION UNIT 2032 22,425.44 SPUMP0000000154 Odor Control Scrubber 3 Chem Feed Stage 3 Hydrogen PeroxideODOR REDUCTION UNIT 2032 22,425.44 SPUMP0000000157 RAS P4 Pump SEWER PUMP 2032 18,664.90
SPUMP0000000158 RAS P5 Pump SEWER PUMP 2032 18,664.90
SPUMP0000000167 Odor Control Scrubber 4 Chem Feed Stage 1 Sulfuric Acid ODOR REDUCTION UNIT 2032 22,425.44 SPUMP0000000175 Submersible Solar Dryer Storm Drain P2 SEWER PUMP 2032 41,228.15 SPUMP0000000184 Super Disc Filter Backwash Pump 1 SEWER PUMP 2032 41,581.26 SPUMP0000000185 Super Disc Filter Backwash Pump 2 SEWER PUMP 2032 41,581.26 SPUMP0000000186 Super Disc Filter Backwash Pump 3 SEWER PUMP 2032 41,581.26 SPUMP0000000194 Centri Hot Water Booster Pump DIGESTER GAS SYSTEM 2032 13,024.09 WPUMP0000000114 Vertical Turbine Non Potable Water P1 SEWER PUMP 2032 39,416.78 WPUMP0000000115 Vertical Turbine Non Potable Water P2 SEWER PUMP 2032 39,416.78 WPUMP0000000116 Vertical Turbine Non Potable Water P3 SEWER PUMP 2032 39,416.78 \\Wmwd-fsmain\WRCRWA\Budget\BUDGET 2025-2026\Budget Binder\Asset Replacement Page 5

WRCRWA ASSET REPLACEMENT SCHEDULE
Treatment System

ASSET ID DESCRIPTION ASSET CLASS

ESTIMATED

REPLACEMENT YEAR REPLACEMENT COST
WPUMP0000000117 Vertical Turbine Non Potable Water P4 SEWER PUMP 2032 39,416.78 SHSTARTSEC0000000077 VFD Centrifuge 1 Feed Pump Starter Section STARTER SECTION 2033 45,092.30 SHSTARTSEC0000000078 VFD Centrifuge 2 Feed Pump Starter Section STARTER SECTION 2033 45,092.30 SHSTARTSEC0000000079 VFD Centrifuge 3 Feed Pump Starter Section STARTER SECTION 2033 45,092.30 SPUMP0000000148 Screw Equalization Basin Archimedes P1 SEWER PUMP 2033 22,546.15 SPUMP0000000149 Screw Equalization Basin Archimedes P2 SEWER PUMP 2033 22,546.15 SPUMP0000000151 Chopper Digester Mixing P1 MIXER 2034 39,539.50 SPUMP0000000152 Chopper Digester Mixing P2 MIXER 2034 39,539.50 SHMOTOR0000000014 Centrifuge 2 Motor MOTOR 2035 48,299.18 PLCENTRIF0000000004 Centrifuge 1 CENTRIFUGE 2035 474,997.73 PLCENTRIF0000000005 Centrifuge 2 CENTRIFUGE 2035 474,997.73 PLCENTRIF0000000006 Centrifuge 3 CENTRIFUGE 2035 474,997.73 SHGEARDRV0000000023 Cage Primary Clarifier No. 1 Gear Drive GEAR DRIVE UNIT 2035 114,752.37 SHGEARDRV0000000024 Cage Primary Clarifier No. 2 Gear Drive GEAR DRIVE UNIT 2035 114,752.37 SHMOTOR0000000008 RAS P1 Motor MOTOR 2035 19,719.38
SHMOTOR0000000010 RAS P3 Motor MOTOR 2035 21,717.91
SHMOTOR0000000013 Centrifuge 1 Motor MOTOR 2035 48,299.18 SHMOTOR0000000015 Centrifuge 3 Motor MOTOR 2035 48,299.18 SPUMP0000000019 Progressive Cavity Centrifuge 2 Feed CENTRIFUGE 2035 24,742.61 SPUMP0000000020 Progressive Cavity Centrifuge 3 Feed CENTRIFUGE 2035 24,742.61 SPUMP0000000217 Grit P1 Pump GRIT CHAMBER 2035 56,881.16 $ 13,709,971.63
\\Wmwd-fsmain\WRCRWA\Budget\BUDGET 2025-2026\Budget Binder\Asset Replacement Page 6