PART 2 - PRODUCTS - NOT USED
PART 3 – EXECUTION
3.1 Preparation
A. California Government Code §4216 states Contractors “planning to conduct any excavation shall contact the appropriate regional notification center at least two Working Days but not more than 14 Calendar Days, prior to commencing excavation.” B. In Southern California, appropriate regional notification center is Underground Service Alert of Southern California (DigAlert) (1-800-422-4133) or 811.
C. Underground Service Alert ticket numbers shall be available at construction site.
D. Contractor shall be responsible for damage done to public or private property shown on Plans or marked or staked in field.
E. Construction Plans will be provided to Utilities by City.
F. Provide construction schedule to Utilities before beginning trenching or excavation.
1. Coordinate construction schedule with Utility Owner's requirements.
G. Notify Utility Owner ≥10 Calendar Days in advance of shutdown of existing mains or services.
H. Notify Utility Owner ≥ 72 hours in advance of utility crossing construction.
1. Coordinate construction schedule with utility service requirements.
I. Before starting Work, make exploratory excavations to determine vertical and horizontal location, alignment, depth, material type, and size of utilities, service connections, and buried structures within 24” of Work.
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 1-22-dp 31 05 50 – Protecting Existing Utilities - 6 of 8
1. Conduct exploratory excavations at tie-in locations and at least 1,300’ ahead of pipe trench heading at least 5 Working Days in advance of planned construction to provide lead-time to:
a. Resolve utility conflicts,
b. Allow for adjustment in alignment or grade line,
c. Verify pipe and utility location and depths, types materials, conditions and sizes for ordering proper transition and/or tie-in fittings,
d. Allow City's Representative to verify no buried utilities interfere with proposed construction.
2. Where potholing or exposure is not done, repair or replacement of damaged utilities and necessary horizontal and vertical realignments shall be paid for entirely by Contractor.
J. Electrical utilities may maintain energized underground electrical power lines in immediate vicinity of Work.
1. These power lines represent an extreme hazard from electrical shock to construction personnel or equipment coming in contact with them.
2. State law requires parties planning excavations in public right of way to contact Utilities for locations of their underground facilities.
3. Contractors, their employees, and other personnel working near underground power lines must be warned to take adequate protective measures. a. (See: OSHA Std 1926-651(A)).
4. Notify electrical Utility to arrange, if possible, to have these lines de-energized when Work reaches their immediate vicinity.
5. Cost of such temporary arrangements shall be borne by Contractor.
K. Electrical utility companies may maintain energized aerial electrical power lines in immediate vicinity of Work.
1. Do not consider these lines to be insulated.
2. Construction personnel working near these lines are exposed to an extreme hazard from electrical shock.
3. Contractors, their employees and construction personnel working on this project must be warned of danger and instructed to take adequate protective measures, including maintaining at least 10’ clearance between lines and construction equipment and personnel.
a. (See OSHA Std 1926.550(A)15).
4. Notify electrical utility company to arrange, if possible, to have these lines de-energized or relocated when Work reaches their immediate vicinity.
5. Cost of such temporary arrangements shall be borne by Contractor.
L. Neither City nor their Representative shall be responsible for verifying need for electrical Utility shutdowns, nor for verifying shutdowns have taken place.
3.2 Protection
A. Protect existing active services and utilities in place against damage from construction.
B. Protect existing utilities running parallel to proposed pipelines, sewers, conduits, structures and other improvements in place.
1. This includes protection in place of backfill above utility and pipe bedding.
C. The following installation standards shall be followed:
1. City of Corona Standard Drawings
a. Standard Drawing 407 for water main crossing beneath existing utility. b. Standard Drawing 407R for recycled water main crossing beneath existing utility.
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 1-22-dp 31 05 50 – Protecting Existing Utilities - 7 of 8 c. Standard Drawing 419 for utility separation requirements.
D. Maintain existing services and utilities in service.
1. Do not interrupt or shut down active services or utilities except where previous written authorization has been obtained from City's Representative and Utility.
2. Do not disturb support of utilities without authorization from Utility Owner.
3. Where protection is required to ensure support of utilities, furnish and place necessary protection, pipe and duct supports as needed.
4. Maintain valves, switches, vaults, and meters readily accessible for emergency shutoff.
5. Notify Utilities in writing ≥3 Working Days before authorized shutdown.
6. Unauthorized shutdowns shall only be made where necessary, as emergency measure, to protect property or human life until proper authorization can be obtained.
E. Governmental agencies and Utility Owners of utilities reserve right to enter at any time upon any street, alley, right-of-way, or easement for purpose of making changes in their facilities and for purpose of maintaining and making repairs.
1. If Contractor hits utility, take prompt action to make sure employees and public are not endangered.
a. If water line is hit, evacuate trench immediately.
2. If oil or gas line is hit, evacuate employees and public from immediate vicinity.
3. Treat conduits as though they are high-voltage or high-current electrical conduits.
4. Do not tamper with conduits until conduit owner is called and power shut off.
5. In all cases, call Fire Department and notify Utility Owner immediately.
F. When placing concrete around or contiguous to non-metallic utility installations:
1. Construct 2” cushion of foam, expansion joint or other resilient material or
2. Provide sleeve or other opening resulting in 2” minimum-clear annular space between concrete and utility or
3. Other City-accepted means to prevent embedment in or bonding to concrete.
G. Where concrete is used for backfill or structures which would result in embedment, or partial embedment of metallic utility installations, or where Contractor damages coating, bedding, or cathodic protection system, notify City and arrange to secure advice of affected Utility regarding procedures to maintain or restore system integrity.
3.3 Removal and Reconstruction
A. Remove interfering portions of utilities shown as “abandoned” or to be “abandoned in place.”
1. Before starting removal, ascertain from City or Utility whether abandonment is complete.
B. Notify City’s Representative in writing of construction schedule changes which may affect time available for protection, removal, or relocation of utilities.
C. Replace damaged or removed utilities in kind, except as otherwise shown or authorized by City's Representative.
1. Reconstruct utilities with new material of same size, type and quality as that removed.
3.4 Backfill and Compaction
A. Backfill and compact under and around utilities so no voids are left.
B. Before replacing utility, backfill trench and compact to elevation 1’ above top of ends of utility.
1. Excavate cross trench of proper width for utility.
C. Sand-cement slurry may be used as backfill to ease compaction.
1. Sand-cement slurry shall consist of 1 sack (94 pounds).
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 1-22-dp 31 05 50 – Protecting Existing Utilities - 8 of 8
2. Portland cement per cubic yard of slurry.
3. Add sufficient moisture for workability without exceeding 6” slump.
4. Submit specific methods and procedures to City's Representative prior to construction.
3.5 Abandoned Utility Lines
A. Remove and dispose of abandoned utilities within trench per Section 02 41 15.
3.6 Servicing Electrical Utilities
A. Protect and interface with servicing Electrical Utility per Section 26 05 10.
3.7 Field Quality Control
A. Field testing shall include:
ITEM TEST FOR
TEST STANDARD
(ASTM OR OTHER TEST STANDARD) FREQUENCY
FIRST
TEST PAID
FOR BY
RETESTS
PAID FOR
BY
Cement-Sand
Slurry Backfill
Slump (6”
Maximum)
ASTM C143 1 each batch City Contractor
B. Replace and adjust valve boxes and covers as required in presence of City’s Representative.
END OF SECTION
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 3-22-dp 31 23 00 - Excavation and Fill - 1 of 21
SECTION 31 23 00
EXCAVATION AND FILL
PART 1 - GENERAL
1.1 Work Included
A. Structural, unclassified, and trenching excavation activities as required to complete Work under wet and dry conditions in whatever material or class of material is encountered, including:
1. Contacting and notifying underground utilities, ≥48-hours before excavating in accordance with Section 31 05 50.
2. Compliance with State and Federal safety regulations, including provisions of California Labor Code §6500, California Labor Code §6705, and California Code of Regulations Title 8, §1504.
a. Refer to Section 01 35 26 for additional description of these requirements.
3. Designing, furnishing, placing, and removing sheeting, shoring and bracing needed to safely support sides of excavations.
4. Compliance with applicable agencies’ permit conditions for Work in public or railroad right-of-way, and for Work on private property.
5. Loosening, excavating, removing, loading, and transporting excess soil from excavations.
6. Stockpiling, exporting and importing material.
7. Pumping, ditching, draining, and other required measures to remove or exclude water.
8. Supporting and protecting structures above and below ground.
9. Maintaining trees which are not permitted to be removed.
10. Preparing and stabilizing subgrade for pipe, paving and structures.
11. Backfilling around structures and backfilling of trenches and pits.
12. Transporting, depositing, and compacting fill where required.
13. Rough and fine grading, and preparation of right-of-way.
14. Legal disposal of cleared, grubbed and excess excavated materials.
15. Cleaning up debris, papers and loose rocks.
16. Restoring fences and other disturbed property.
17. Other incidental earthwork and supplementary operations needed to complete Work.
B. Excavations for appurtenant structures including vaults and valve boxes shall be considered as trench excavation.
C. Excavation shall include removal of water and materials which interfere with construction Work.
1. Removal of water to levels below structure subgrade will be necessary only where required by Contract Documents.
D. Excavation for pipe and conduit Work shall be by open trench unless otherwise shown.
1. Should Contractor elect to tunnel or jack portions not so specified, they shall first obtain acceptance from City’s Representative, and payment will be limited to prices bid for open trench Work.
E. Refer to General Conditions §17 “Trenches” for additional Corona requirements for trench safety.
F. Refer to the following sections for Work not covered herein.
1. Section 01 35 26 for trench safety requirements.
1-22-dp
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 3-22-dp 31 23 00 - Excavation and Fill - 2 of 21
2. Section 01 55 26 for trench plating requirements.
3. Section 02 41 13 for site demolition and removal of surface improvements.
4. Section 31 05 50 for requirements for protecting existing utilities.
5. Section 31 23 13 for requirements for subgrade preparation.
6. Section 33 05 26 for buried pipe identification tape.
G. Conform to Standard Specifications for Public Works Construction (Greenbook) §200, 211, 300, 301, applicable permits, and requirements herein.
H. Refer to the following City of Corona Standard Drawings:
1. Standard Drawing 406 for water pipe trenching and bedding.
I. Obtain Cal OSHA annual Excavation and Dirt Moving Permit (required for excavations greater than 5’ in depth)
J. Except as modified herein, earthwork shall conform to Standard Specifications for Public Works Construction (Greenbook) §300.
1.2 Related Work
A. Section 01 10 01: Summary of Work and Sequence of Construction B. Section 01 33 00: Submittal Procedures
C. Section 01 35 26: Governmental Safety Requirements
D. Section 01 40 00: Quality Requirements
E. Section 01 61 00: Common Product Requirements
F. Section 01 65 00: Product Delivery Requirements
G. Section 01 66 00: Product Storage and Handling Requirements H. Section 01 73 00: Execution
I. Section 01 73 33: Mechanical Identification
J. Section 03 30 00: Cast-in-Place Concrete
K. Section 31 05 50: Protecting Existing Utilities
L. Section 31 23 13: Subgrade Preparation
M. Section 33 05 26: Utility Identification
1.3 Definitions
A. The following definitions apply:
1. Lower Trench Zone: Portion of trench above pipe zone and ≥60” below finish grade in trenches ≥36” wide.
2. Pavement Zone: Portion of excavation containing aggregate base, asphalt or concrete paving.
3. Pipe Zone: Portion of trench from 6” below pipe to plane 12” above top of pipe. (For trenches with parallel pipes, Material from 6” below lowest pipe to plane 12” above top of highest pipe.)
4. Relative Compaction: Ratio of field dry or wet density to laboratory maximum dry or adjusted wet density, respectively expressed as percentage. a. For testing purposes, percentages shall be determined by weight.
5. Street Zone: Portion of trench below pavement subgrade to 30” below finished road surface.
6. Surface Zone: Upper 12” of trench to finish surface in unimproved or landscaped areas.
7. Suitable Soil Material: Imported or excavated material free from shale, sod, stones, concrete and clods ≥4” diameter, roots, trash, lumber, organic material, ashes and other debris considered unsuitable by City.
a. Material shall have no unusual color or sulfide odor.
8. Trench Zone: Portion of trench above pipe zone and above deep trench zone and below street zone or surface zone.
1-22-dp
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 3-22-dp 31 23 00 - Excavation and Fill - 3 of 21
B. Refer to additional definitions under Section 2.2 Materials:
1.4 Quality Assurance
A. Use adequate numbers of skilled workmen trained and experienced in necessary trades and crafts and completely familiar with specified requirements and methods for proper performance of Work of this section.
B. Provide adequate equipment and methods to accomplish earthwork in accordance with applicable grading codes and ordinances, Contract Documents, and recommendations in accepted geotechnical report(s) and grading plan(s).
C. City has hired a Geotechnical Engineer to oversee earthwork, perform laboratory and field tests, and verify compliance with recommendations from Geotechnical Report and Contract Documents.
1. During grading and earthwork, Geotechnical Engineer will observe, map, and document subsurface exposures to verify geotechnical design assumptions.
2. If observed conditions materially differ from interpreted assumptions during design, Geotechnical Engineer will inform City, recommend appropriate design changes to accommodate observed conditions, and notify review agency where required.
3. Subsurface areas to be geotechnically observed, mapped, elevations recorded, and/or tested include natural ground after being cleared for receiving fill, but before fill is placed, bottoms of "remedial removal" areas, key bottoms, and benches made on sloping ground to receive fill.
4. Geotechnical Engineer will observe moisture-conditioning and processing of subgrade and fill materials and routinely test relative compaction of fill.
5. Geotechnical Engineer will provide test results to City and Contractor.
6. If, in opinion of Geotechnical Engineer, unsatisfactory conditions, such as unsuitable soil, improper moisture condition, inadequate compaction, insufficient buttress key size, adverse weather, etc., are resulting in a quality of Work less than required in these specifications, Geotechnical Engineer will reject Work and may recommend to City that construction be stopped until conditions are rectified.
1.5 References
A. Reference publications below form part of this specification to extent referenced and are referred to within text by basic designation only.
1. ASTM C12 Installing Vitrified Clay Pipe Lines
2. ASTM D75 Sampling Aggregates
3. ASTM C143 Slump of Hydraulic Cement Concrete
4. ASTM C136 Sieve Analysis of Fine and Coarse Aggregates
5. ASTM C1479 Installation of Precast Concrete Sewer, Storm Drain, and Culvert Pipe
6. ASTM D1556 Density and Unit Weight of Soil in Place by Sand Cone Method
7. ASTM D1557 Laboratory Compaction Characteristics of Soil Using Modified Effort
8. ASTM D2321 Underground Installation of Thermoplastic Pipe for Sewers and Other Gravity-Flow Application
9. ASTM D2937 Density of Soil in Place by the Drive-Cylinder Method
10. ASTM D4253 Maximum Index Density and Unit Weight of Soils Using Vibratory Table
11. ASTM D4254 Maximum Index Density and Unit Weight of Soils and Calculation of Relative Density
12. ASTM D4829 Expansion Index of Soils
13. ASTM D6938 In-Place Density and Water Content of Soil and Soil-Aggregate by Nuclear Methods (Shallow Depth)
14. AWWA C600 Installation of Ductile Iron Water Mains and Their Appurtenances
15. AWWA C604 Installation of Steel Water Pipe – 4” and Larger
16. AWWA C605 Underground Installation of Polyvinyl Chloride (PVC) and Molecularly Oriented Polyvinyl Chloride (PVCO) Pressure Pipe and Fittings
17. AWWA M11 Steel Pipe – A Guide for Design and Installation
18. AWWA M23 PVC Pipe – Design and Installation
19. AWWA M41 Ductile Iron Pipe and Fittings
20. AWWA M55 PE Pipe – Design and Installation
21. California Test Method 202 Sieve Analysis of Fine and Coarse Aggregates 1-22-dp
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 3-22-dp 31 23 00 - Excavation and Fill - 4 of 21
22. California Test Method 216 Relative Compaction of Untreated and Treated Soils and Aggregates
23. California Test Method 217 Sand Equivalent
24. California Test Method 231 Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gage
25. California Test Method 301 Resistance “R” Value of Treated and Untreated Bases, Subbases, and Basement Soils by Stabilometer
26. SSPWC Standard Specifications for Public Works Construction (Greenbook) §300-2 “Unclassified Excavation”
27. SSPWC Standard Specifications for Public Works Construction (Greenbook) §300-3 “Structure Excavation and Backfill”
28. SSPWC Standard Specifications for Public Works Construction (Greenbook) §300-4 “Unclassified Fill”
29. SSPWC Standard Specifications for Public Works Construction (Greenbook) §300-5 “Borrow Excavation”
30. SSPWC Standard Specifications for Public Works Construction (Greenbook) §306-1 “Open-Trench Excavations”
1.6 Submittals
A. Furnish the following submittals.
SUBMITTAL DESCRIPTION
MOBILIZATION SUBMITTALS
Work Plan Submit Work plan to include:
1.Schedule
2.Sequence of grading
3.Estimated quantities of daily earthwork planned for site.
Permits Submit copies of permits obtained for excavation and grading required by state and local governing authorities
On City’s request, submit written permission from property owner(s) permitting legal disposal of surplus material.
Certificate of Compliance Submit affidavit of compliance with California Construction Safety Order requirements prior to beginning excavation on any trench or excavation.
Affidavit shall certify compliance with all shoring, bracing, sloping or other protective system provisions required by California Construction Safety Orders for worker protection from hazard of caving ground during excavation
SAMPLES
Materials Sample (Imported
Backfill)
Submit 100-lbm dry weight sample of for imported backfill 10 Calendar Days before intended use.
Clearly identify source, including street address and community of origin. (Do not use imported material at Work site if different from sample)
QUALITY ASSURANCE AND CONTROL SUBMITTALS
Laboratory Report on
Proposed Imported Backfill
Submit for acceptance 10 Calendar Days before intended use.
Identify source, including street address and community of origin. (Do not use imported material at Work site if different from tested material) Certificate of Compliance Submit certification from soils testing laboratory showing test results and certifying backfill and bedding materials conform to specified requirements.
B. Refer to Section 01 33 00 for definition of requirements for Product Data.
1.7 Delivery, Storage, and Handling
A. Refer to Sections 01 65 00 and 01 66 00 for delivery, storage, and handling requirements.
1.8 Project Site Conditions
A. Refer to Section 01 10 01 for full list of project site conditions.
1.9 Unit Prices
A. Refer to Section 01 22 00 for payment for excavation safety measures.
B. Refer to Section 01 22 00 for measurement and payment clauses for excavation and fill.
PART 2 - PRODUCTS
2.1 Acceptable Manufacturers
A. Acceptable Manufacturers include:
ITEM MANUFACTURER MANUFACTURER LOCATION
1-22-dp
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 3-22-dp 31 23 00 - Excavation and Fill - 5 of 21
ITEM MANUFACTURER MANUFACTURER LOCATION
Buried Pipe WarningLocating and
Identification Tape
Refer to Section 33 05 26
2.2 Materials
A. Refer to Section 01 61 00 for basic requirements for products and materials.
B. Refer to Section 31 05 16 for basic requirements for aggregate and rock products.
C. The following definitions shall apply to soil and backfill:
ITEM MATERIAL SPECIFICATION
Granular Material (per
Greenbook 217-1.1)
Sand, Gravel, or
Crushed Aggregate
Sand equivalence ≥30 per California Test Method 217
or permeability coefficient ≥1.5”/hr
≤ 20% of material shall pass through 200-mesh sieve.
Crushed Rock Crushed Rock per
SSPWC (Greenbook) §
200-1.2
Refer to Section 31 05 16
Pea Gravel Gravel 100% passing ¾” sieve
75-100% passing No 4 sieve
12-50% passing No 30 sieve
5-20% passing No 100 sieve
0-10% passing No 200 sieve
Imported Sand Sand Sand equivalence ≥30 per California Test Method 217 100% passing ⅜” sieve
75-100% passing No 4 sieve
12-50% passing No 30 sieve
5-20% passing No 100 sieve
0-15% passing No 200 sieve
Pervious Backfill (per
Greenbook 217-4)
Gravel, Crushed Gravel,
Crushed Rock, Natural
Sands, and/or
Manufactured Sands
Sand equivalence ≥60 per California Test Method 217
100% passing ¾” sieve
80-100% passing ⅜” sieve
0-8% passing No 100 sieve
0-3% passing No 200 sieve
Suitable Structural Backfill
Material (per Greenbook 217-
2.1)
Imported or Excavated
Material Meeting
Specification
Sand equivalence ≥20 per California Test Method 217
35-100% passing No 4 sieve
20-100% passing No 30 sieve
Material free from shale, stones, brick rubble, broken
asphalt pavement, broken concrete and clods >4””
diameter within 12” of paving subgrade or pipe materials.
Material free from shale, stones, brick rubble, broken
asphalt pavement, broken concrete and clods >4””
diameter within 12” of structure.
Material free from shale, stones, brick rubble, broken
asphalt pavement, broken concrete and clods >6”
diameter at locations >12” from subgrades or structures.
Material shall be free from leaves, grass, sod, roots,
stumps, sludge, trash, lumber, organic material, ashes and other debris considered unsuitable by City.
Material shall have no unusual color or sulfide odor.
Compact to specified densities.
Suitable Soil Material Imported or Excavated
Material Meeting
Specification
Material defined in Part 1.3 “Definitions” above.
Compact to specified densities.
Unclassified Fill Imported or Excavated
Material Meeting
Specification
Material free from shale, stones, brick rubble, broken
asphalt pavement, broken concrete and clods >6”
diameter.
Material free from leaves, grass, sod, roots, stumps,
sludge, trash, lumber, organic material, ashes and other debris considered unsuitable by City.
1-22-dp
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 3-22-dp 31 23 00 - Excavation and Fill - 6 of 21
ITEM MATERIAL SPECIFICATION
Material shall have no unusual color or sulfide odor.
Compact to specified densities.
Oversized rock material may, at City’s discretion, be
permitted to be disposed of in areas outside footprints of structures or utilities and ≥ 3’ below finish grade
elevations.
Cement-Sand Slurry Cement (94-lb sacks per
cubic yard of mix)
1 sack per cubic yard minimum, and not less than that
required by applicable agency encroachment permits
Maximum Slump ≤6” per ASTM C143
Native Material Material obtained from required site excavations When native material is unsuitable for use in backfill, it shall be disposed of off-site and suitable material capable of being compacted to required relative density shall be furnished by Contractor at their expense.
Import Material City-accepted material obtained from off-site borrow areas.
Water for Compaction Chloride Concentration ≤500 ppm
Sulfate Concentration ≤500 ppm
pH 7.0-9.0
Purity Free from acid, alkali, or organic materials injurious to pipe coatings
Buried Pipe Warning-Locating
and Identification Tape
Refer to Section 33 05 26.
Refer to section on appropriate utility pipe or conduit material for required message D. Materials for soil and backfill for pipelines and utilities shall be:
ITEM MATERIAL SPECIFICATION
OVEREXCAVATION BACKFILL
Backfill of Tunnels beneath
Concrete Flatwork
Sand 90% compaction per ASTM D1557 or California Test
Method 216
Sand equivalence ≥30 per California Test Method 217
or permeability coefficient ≥1.5”/hr
Pipe Base Material (Backfill
material for Over-Excavation to
be placed above trench bottom
and below pipe zone)
Cement-Sand Slurry Cement-sand slurry mix specified above Native or Imported
Granular Material
90% compaction per ASTM D1557 or California Test
Method 216
Sand equivalence ≥30 per California Test Method 217
or permeability coefficient ≥1.5”/hr
Material shall be suitable soil material as defined above.
Maximum lifts vary with equipment. Refer to 3.2 below.
BEDDING MATERIAL
Pipe Zone Material for Pressure
Pipe
(Material from 6” below pipe to
plane 12” above top of pipe)
Native or Imported
Granular Material
90% compaction per ASTM D1557 or California Test
Method 216
Sand equivalence ≥30 per California Test Method 217
or permeability coefficient ≥1.5”/hr
No material >2” in any dimension shall be placed within 1’ of pipes, valves, or structures.
Material shall be suitable soil material as defined above.
Maximum lifts vary with equipment. Refer to 3.2 below
Place buried identification tape where specified
BACKFILL MATERIAL
Lower Trench Zone Material
(Material in Pipe Trench above
Pipe Zone and ≥60” below finish
grade in trenches 36” and wider)
Cement-Sand Slurry Cement-sand slurry mix specified above Suitable Soil Material
(where cement-sand
slurry not required)
90% compaction per ASTM D1557 or California Test
Method 216
Expansion Index of 0-50 per ASTM A4829
Maximum lifts vary with location and method.
See below.
May contain stones, asphalt pavement or concrete of up to 12” in largest dimension so long as fines surround such solids so no voids are present in placed backfill.
1-22-dp
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 3-22-dp 31 23 00 - Excavation and Fill - 7 of 21
ITEM MATERIAL SPECIFICATION
No material >2” in any dimension shall be placed within 1’ of pipes, valves, or structures.
Backfill within 24” of ductile-iron fittings or valves shall be clean, washed sand.
Provide buried pipe warning and locator tape in pipe
trench 18” above pipe.
Upper Trench Zone Material
(Material in Pipe Trench above
Pipe Zone and below Street
Zone or Surface Zone)
Cement-Sand Slurry Cement-sand slurry mix specified above Suitable Soil Material
(where cement-sand
slurry not required)
90% compaction per ASTM D1557 or California Test
Method 216
Sand equivalence ≥20 per California Test Method 217
Expansion Index of 0-50 per ASTM A4829
Maximum lifts vary with location and method.
See below.
May contain stones, asphalt pavement or concrete ≤6” in largest dimension so long as fines surround such solids so no voids are present in placed backfill.
No material >2” in any dimension shall be placed within 1’ of pipes, valves, or structures.
Backfill within 24” of ductile-iron fittings or valves shall be clean, washed sand.
Provide buried pipe warning and locator tape in pipe
trench 18” above pipe.
Street Zone Material (Base
material in pipe trench below
pavement subgrade to 30” below
finished road surface.
Crushed Aggregate
Base Material
95% compaction per ASTM D1557 or California Test
Method 216
No material >2.5” in any dimension shall be placed within street zone.
Conform to SSPWC (Greenbook) §200-2.2, crushed
aggregate base
Contractor may substitute on-site materials conforming to SSPWC (Greenbook) §200-2.5, Processed Miscellaneous
Base
Expansion Index of 0-50 per ASTM A4829
Maximum lifts vary with equipment. Refer to 3.2 below
Material shall be suitable soil material as defined above.
Stones concrete and clods smaller than specified limit may not exceed 20% of backfill volume over pipe segment.
Maximum lifts vary with equipment. Refer to 3.2 below
SURFACE AND PAVING MATERIAL
Pavement Zone Material
(Aggregate base and asphalt or
concrete paving)
Refer to Paving Plans or
Details
Refer to Section / 32 12 16 / 33 13 13
Surface Zone Material (upper
12” of trench to finish surface in
unimproved or landscaped
areas)
Topsoil per Section 32
90 00
80% compaction per ASTM D1557 or California Test
Method 216
No material >2.5” in any dimension shall be placed within surface zone.
Maximum lifts vary with equipment. Refer to 3.2 below
E. Materials for soil and backfill for site grading and unclassified fill shall be:
ITEM MATERIAL SPECIFICATION
Backfill for Over-Excavation
Beneath General Excavation
Suitable Soil Material 90% compaction per ASTM D1557 or California Test Method 216
Loose Ground Remaining After
Stripping
Suitable Soil Material 90% compaction per ASTM D1557 or California Test Method 216
Unclassified Fill Below Ground Suitable Soil Material 90% compaction per ASTM D1557 or California Test Method 216
Maximum lifts vary with equipment. Refer to 3.2 below
Unclassified Fill Embankments Suitable Soil Material 90% compaction per ASTM D1557 or California Test Method 216
Maximum lifts vary with equipment. Refer to 3.2 below
1-22-dp
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 3-22-dp 31 23 00 - Excavation and Fill - 8 of 21
ITEM MATERIAL SPECIFICATION
2:1 maximum embankment slope
Surface Zone Material (upper
12” below finish surface in
unimproved or landscaped
areas)
Topsoil per Section 32
90 00
80% compaction per ASTM D1557 or California Test
Method 216
Maximum lifts vary with equipment. Refer to 3.2 below
F. Materials for soil and backfill for paving shall be:
ITEM MATERIAL SPECIFICATION
Backfill for Over-Excavation
Beneath Paving
Cement-Sand Slurry Cement-sand slurry mix specified above Suitable Soil Material
(where concrete slurry
not required)
90% compaction per ASTM D1557 or California Test
Method 216
Roadway/Paving Fills >3’ Below
Base
Suitable Soil Material 90% compaction per ASTM D1557 or California Test Method 216
Maximum lifts vary with equipment. Refer to 3.2 below
Top 3’ of Roadway/Paving Fills
Below Base
Suitable Soil Material 90% compaction per ASTM D1557 or California Test Method 216
Maximum lifts vary with equipment. Refer to 3.2 below
Top 6” where Roadway Paving
is Placed Directly on Subgrade
Material
Suitable Soil Material 95% compaction per ASTM D1557 or California Test Method 216
Top 6” where Alley, Curb,
Gutter, Driveway, or Sidewalk
Paving is Placed Directly on
Subgrade Material
Suitable Soil Material 90% compaction per ASTM D1557 or California Test Method 216
Roadway/Paving Base Crushed Aggregate
Base Material
95% compaction per ASTM D1557 or California Test
Method 216
Conform to SSPWC (Greenbook) §200-2.2, Crushed
Aggregate Base
Contractor may substitute on-site materials conforming to SSPWC (Greenbook) §200-2.2, Processed Miscellaneous
Base
Maximum lifts vary with equipment. Refer to 3.2 below
Refer to Section 32 12 16 for asphalt-concrete paving or 32 13 13 for concrete paving
G. Materials for soil and backfill for structures shall be:
ITEM MATERIAL SPECIFICATION
Backfill for Over-Excavation
Beneath Structures
Concrete Refer to Section 03 30 00 Class A
Backfill of Tunnels Beneath
Concrete Flatwork
Sand 90% compaction per ASTM D1557 or California Test
Method 216
Structural Fills > 5’ Below
Foundation
Suitable Structural
Backfill Material (per
Greenbook 300-3.5)
90% compaction per ASTM D1557 or California Test
Method 216
Maximum lifts vary with equipment. Refer to 3.2 below
Top 5’ of Structural Fill Suitable Structural
Backfill Material (per
Greenbook 300-3.5)
95% compaction per ASTM D1557 or California Test
Method 216
Maximum lifts vary with equipment. Refer to 3.2 below
Structural Bedding Beneath
Footings, Slabs and Sand
Blanket
Crushed Aggregate
Base Material
95% compaction per ASTM D1557 or California Test
Method 216
Conform to SSPWC (Greenbook) §200-2.Crushed
Aggregate Base
Contractor may substitute on-site materials conforming to SSPWC (Greenbook) §200-2.5, Processed Miscellaneous
Base
Unless otherwise shown, provide 8” layer of aggregate
beneath 4” sand layer
Sand Blanket Beneath Slabs Sand 90% compaction per ASTM D1557 or California Test 1-22-dp
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 3-22-dp 31 23 00 - Excavation and Fill - 9 of 21
ITEM MATERIAL SPECIFICATION
Method 216
Unless otherwise shown, provide 4” sand layer with10-mil PVC vapor barrier with sealed laps in center of sand layer.
PART 3 - EXECUTION
3.1 Preparation
A. Pipe and other underground improvements may or may not be shown on Plans.
1. Preserve and protect such improvements whether shown or not.
2. Refer to Section 31 05 50 for requirements for protecting existing utilities
3. Where necessary to remove and replace or to relocate such improvements to prosecute Work, improvements shall be removed, maintained, and permanently replaced by Contractor at their expense, except as otherwise provided in Contract Documents.
4. California Government Code §4216 states Contractors “planning to conduct any excavation shall contact the appropriate regional notification center at least two working days but not more than 14 calendar days, prior to commencing excavation.” B. Control surface drainage and prevent surface water from entering excavations as follows:
1. Control grading to prevent water running into excavations.
2. Maintain feathered edges of asphalt around trench plates.
3. Do not obstruct surface drainage away from receiving watershed. a. Intercept and divert runoff around Work using temporary slopes, sand bags, dikes, swales, levees, curb walls, drainage ditches, gutters, sumps, drains or other means of channeling flow without interruption around excavations.
4. Preserve existing drainage patterns except as otherwise shown. a. Where construction methods cause temporary obstruction of drainage patterns, provide temporary facilities adequate for expected flows and a means of emergency removal of obstruction.
5. Design surface drainage system to minimize erosion on or off site.
6. Dispose of water in suitable manner without damage to adjacent property. a. Do not drain water into Work built or under construction without prior consent of City’s Representative.
b. Dispose of water according to permits and in such manner as not to be a menace to public health and public or private property.
C. Refer to Section 31 23 19 for requirements for dewatering.
1. Commence dewatering for structures and pipelines when groundwater is first encountered.
2. Continue dewatering until water can be allowed to rise in accordance with provisions of Section 31 23 19.
D. Remove and reconstruct asphalt paving improvements per Section 02 41 14 and 32 12 16.
E. Remove and reconstruct concrete paving improvements per Section 02 41 14 and 32 13 13.
F. Preparation for fill shall proceed as follows:
1. Clear and grub areas to receive fill or embankment per Section 31 10 00.
2. Scarify areas to receive fill to ≥6” to provide a bond between existing ground and fill material to be deposited thereon.
3. Moisture condition scarified areas and compact to ≥85%. 1-22-dp
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 3-22-dp 31 23 00 - Excavation and Fill - 10 of 21
4. When fills are to be placed over existing surface improvements to remain in place cut 4” drainage holes through structure or paving at 5’ centers each way, or break or saw-cut pavement in grid pattern of 5’ each way with minimum ¼” gap between broken sections.
G. Blasting shall be prohibited
H. Excavate slopes to designated lines or slopes either by benching or as directed by City’s Representative.
1. Provide benching when unclassified fill is to be placed on existing natural slope ≥ 1 vertical to 4 horizontal (25%).
a. When unclassified fill is constructed against existing slope, horizontally bench slope face to key unclassified fill into slope face.
2. Bench into firm soils, free of loose or disturbed soils such that ≥2’ vertical face height is exposed into firm soils unless otherwise shown on Plans.
3. Scarify horizontal surface of each bench ≥6” before placing first lift of unclassified fill.
4. Incorporate material cut for benched slope into fill.
I. Minimize impacts of slides and slip-outs as follows:
1. Slide and slip-out materials shall include
a. Material outside planned excavation limits which is unstable and constitutes a potential slide, as determined by City’s Representative b. Material which has come into planned excavation limits c. Material which has slipped out of new or old fills.
2. Excavate slide and slip-out materials to designated lines or slopes either by benching or as directed by City’s Representative.
a. Provide benching when unclassified fill is to be placed on existing natural slope ≥ 1 vertical to 4 horizontal (25%).
b. When unclassified fill is constructed against existing slope, horizontally bench slope face to key unclassified fill into slope face.
c. Bench into firm soils, free of loose or disturbed soils such that ≥3’ vertical face height is exposed into firm soils unless otherwise shown on Plans. d. Scarify horizontal surface of each bench ≥6” before placing first lift of unclassified fill. e. Incorporate material cut for benched slope into fill.
3. Slide and slip-out material may be reused in construction of unclassified fill or disposed of as directed by City’s Representative.
J. Finish excavation slopes to conform to lines and grades shown.
1. Remove debris and loose material.
2. When completed, average plane of slopes shall conform to slopes shown.
3. Refer to paragraph 3.3 below for allowable deviations from Plan elevations.
4. No portion of slope shall encroach to interfere with planned use of facility.
5. Excavation and grading shall be performed to provide finished surfaces in uniform planes with no abrupt breaks in surface.
6. Round ends and tops of excavation slopes where shown on Plans.
K. No material or stockpiles shall cause undue interference with public travel.
1. Provide clear access to fire hydrants, water valves, meters, and private drives, or other property or facilities that may have routine or emergency use.
L. Prepare rock foundation material to receive structural foundation materials as follows:
1. When footing concrete or masonry is to rest upon rock, fully uncover and expose rock.
2. Remove loose or fractured rock to depth sufficient to expose sound rock. 1-22-dp
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 3-22-dp 31 23 00 - Excavation and Fill - 11 of 21
3. Roughly level off rock, or cut to approximate horizontal and vertical steps, and roughen rock to facilitate bond with foundation material.
4. Grout seams in rock under pressure or treat as directed by City’s Representative.
5. Cost of grouting or treatment will be negotiated as Extra Work.
M. Prepare excavated surfaces other than rock to receive structural foundation materials as follows:
1. Take care not to disturb bottom of excavation.
2. Do not complete final removal of foundation material to grade until just before concrete or masonry is placed.
3. Except where overexcavation is directed by City’s Representative, excavation below grade shall be replaced at Contractor’s expense with concrete of same class specified for foundation at time foundation is placed.
4. Where City’s Representative determines backfill will not be detrimental to structure, Contractor may backfill above grade with ≥90% compacted material and then trim to grade shown.
5. Where original ground surface is below footing elevations shown, backfill to 6” above grade with ≥90% compacted material and then excavate to grade shown prior to placing concrete.
6. Complete excavations for piers
N. Do not deposit backfill against new concrete structures until concrete has developed specified 28-day compressive strength.
3.2 Installation
A. Refer to Sections 01 73 00 for basic execution and installation requirements.
B. Furnish and install excavation and fill at locations shown on Plans and Submittals.
C. The following installation standards shall be followed:
1. Requirements of contract-referenced soils reports and investigations.
2. Applicable OSHA and Cal OSHA regulations
3. California Building Code Chapter 18 “Soils and Foundations.”
4. City of Corona Standard Drawings
a. Standard Drawing 406 for water pipe bedding.
5. Manufacturer’s installation and warranty requirements
6. Standard Specifications for Public Works Construction (Greenbook) §300-2 “Unclassified Excavation”
7. Standard Specifications for Public Works Construction (Greenbook) §300-3 “Structure Excavation and Backfill”
8. Standard Specifications for Public Works Construction (Greenbook) §300-4 “Unclassified Fill”
9. Standard Specifications for Public Works Construction (Greenbook) §300-5 “Borrow Excavation”
10. Standard Specifications for Public Works Construction (Greenbook) §306-1 “Open Trench Excavations”
11. Other applicable building code requirements
D. Refer variances between above documents and Contract Documents to City’s Representative.
E. Earthwork within public rights-of-way controlled by a state, county or city, or earthwork within railroad rights-of-way shall be in accordance with requirements and provisions of permits issued by those agencies for construction within their respective rights-of-way. 1-22-dp
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 3-22-dp 31 23 00 - Excavation and Fill - 12 of 21
1. Such permit requirements and provisions which are more restrictive than those specified herein, shall take precedence and supersede provisions of Contract Documents.
F. Should excavated material not be suitable for fill material, import suitable fill material as specified.
G. Wet soil should be anticipated near bodies of water, where ground is damp, or where geotechnical report shows evidence of groundwater.
1. Allow wet soil to dry to near-optimum moisture content before placing as backfill.
2. Material having excessive moisture content may be dried by blading, discing, or harrowing to expedite drying.
3. During compacting, maintain optimum practicable moisture content required for construction in each lift of backfill material.
4. Maintain uniform moisture content throughout lift.
5. If placement is discontinued and proper moisture content is not maintained, bring upper layer back to proper moisture content by sprinkling, cultivating, and rolling backfill material before placing new material.
6. At time of compaction, water content of material shall be at optimum water content ±2%.
7. Do not work material containing excessive moisture to obtain compaction.
H. Should contaminated soil be encountered, perform the following activities:
1. Promptly notify City’s Representative contaminated or potentially contaminated soil has been encountered so City may identify party legally responsible for disposal of contaminated soil and properly direct Contractor how to proceed.
2. Conduct Work in contaminated areas in accordance with applicable OSHA and Cal OSHA regulations.
3. Segregate and cover contaminated soils prior to removal from site.
4. Dispose of contaminated soils as directed by City and as required by law.
I. Should excavation be carried below lines and grades shown, refill excavated space to proper elevation with material as specified in Part 2 above for correction of faulty grades after over-excavation.
1. Transfer construction stake grades into trench as needed to ensure trench bottom is accurately graded.
2. Remove hard spots that prevent uniform thickness of pipe base.
3. Remove boulders or other interfering objects at subgrade.
4. Remove large gravel and cobbles encountered at trench bottom or pipe subgrade.
5. Remove excessively wet, soft, spongy, unstable, or other unsuitable material encountered below proposed location of bedding material to depth directed by City’s Representative.
6. Replace over-excavated material with crushed rock, gravel or granular material of sufficient thickness to form unyielding bedding compacted to provide uniform support and firm foundation.
7. Payment for removal of material and additional backfill required shall be in accordance with Contract Documents.
a. However, if necessity for such additional bedding material has been occasioned by act or failure to act on part of Contractor, Contractor shall bear expense of additional excavation and backfill to required depth.
b. Contractor's attention is called to their responsibilities in maintaining adequate dewatering procedures to ensure an otherwise stable foundation will not be rendered unfit due to water accumulation in trench.
1-22-dp
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 3-22-dp 31 23 00 - Excavation and Fill - 13 of 21
8. Where rock is found, remove rock below grade, and backfill trench with clean imported sand to provide compacted foundation cushion with minimum allowable thickness of 6” under outside diameter of pipe barrel and clear space of 4” under pipe bells. a. Payment for removal of rock and additional backfill shall be in accordance with Contract Documents.
9. Place refill material over full width of trench.
10. Prepare pipe subgrade at trench bottom for specific type of pipe material being installed in accordance with Specifications for said pipe.
11. Place bedding required by Contract Documents.
12. Before laying pipe, check grade with straightedge and correct irregularities.
J. Unclassified fill shall be placed as follows:
1. Construction of unclassified fill shall include preparing surface to receive unclassified fill, and depositing, conditioning, and compacting fill material.
2. Unless special material is required, material for fill or embankments may consist of excavated material from unclassified and structural excavation or a mixture of excavated materials and suitable materials borrowed off-site.
3. Off-site sources of fill shall be designated and are subject to evaluation and acceptance by City’s Representative.
4. City’s Representative may determine locations at which each fill load shall be placed to obtain optimal material blending.
5. City’s Representative may, at their discretion, elect to accept incorporation of oversize rocks, boulders, hardpan, or cemented gravel in excess of specified maximum dimensions outside roadway, pipeline, structure, or foundation footprints and at depths ≥3’ below finish grade.
a. Location and depth of oversized materials into unclassified fill shall be subject to acceptance by City’s Representative.
b. Unclassified fill containing ≥25% by volume of oversize rocks, boulders, hardpan, or cemented gravel placed in a plane ≥3’ below finished grade may be constructed in layers of loose thickness before compaction up to maximum size of rock in material but ≤3’ in thickness.
c. Fill interstices around rock in each layer with earth or other fine material and compact as specified
6. Do not construct unclassified fill when material is frozen or snow blankets prevent proper compaction.
7. Do not place material beyond sloping lines of embankment unless so ordered by City’s Representative.
8. Material allowed to be placed beyond embankment lines shown shall be compacted as required above unless otherwise authorized by City’s Representative.
9. Place unclassified fill material in horizontal layers of depths compatible with location, material being placed and type of equipment used, but not >8” unless otherwise specified or where Contractor demonstrates to City’s satisfaction they can obtain specified relative compaction densities using equipment on site.
10. Unless otherwise accepted, each horizontal layer shall cover length and width of area to be filled before next higher layer is placed.
11. Evenly spread each layer as necessary.
12. Top surface of each layer shall be approximately level, but with crown or crossfall of ≤1 vertical in 20 horizontal (5%) but ≥1 vertical in 50 horizontal (2%) to drain water during construction.
13. Scarify each layer after compaction to provide bond with next layer. 1-22-dp
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 3-22-dp 31 23 00 - Excavation and Fill - 14 of 21
14. As each layer is deposited, apply water to loose material in amount sufficient to ensure optimum moisture content, secure specified compaction, and provide firm, hard, and unyielding fill.
15. Chemical additives may be used in water applied to fill material when accepted by City’s Representative.
16. If excess moisture is encountered in fill, allow fill to dry out, or manipulate each layer to aerate and dry out excess moisture.
17. Compact material for embankments or fills by rolling with power rollers weighing ≥10 tons, with sheepsfoot rollers, vibratory rollers, pneumatic tire rollers, or other Cityaccepted mechanical means appropriate for soil type being compacted, and as required to accomplish Work.
a. Use of trucks, carryalls, scrapers, tractors, or other heavy hauling equipment shall not be considered as rolling in lieu of rollers, but traffic of such equipment shall be distributed over fill in such manner as to use compaction afforded thereby as an addition to compaction by rollers.
18. Compact unclassified fill layers to specified relative compaction using hand-directed compaction equipment where it is impractical due to inaccessibility to use larger compacting equipment.
19. Fill to lines and grades shown with maximum slope not exceeding that shown.
20. Plan haul routes to avoid passing heavy off-highway equipment over pipelines with <4’ cover.
a. Where crossings must be made, provide concrete encasement or accepted bridging.
21. When soil types or a combination of soil types are encountered which tend to develop densely-packed surfaces as a result of spreading or compacting operations, sufficiently roughen each layer after compaction to ensure bond to succeeding layer.
K. Finish grading shall proceed as follows:
1. Uniformly finish grade areas covered by Work, including excavated and filled sections and transition areas to elevations shown.
2. Finished surface shall be smooth, compacted, and free from irregular surface changes.
3. Round edges of spoil and borrow areas to blend into natural contours.
4. Degree of finish ordinarily obtainable from blade grader will be satisfactory for open areas, but hand grading and raking will be required around structures and walkways.
5. Finished surface outside slopes and embankments shall be ≤0.1’ above or below established grade and sloped to prevent ponding.
L. Structural excavation shall proceed as follows:
1. Excavation of material of whatever nature necessary for construction of structures and foundations shall be carried out to lines and grades shown, and as required to provide working clearance and safe construction slopes and to emplace shoring, sheeting, bracing, and other Work required.
2. Except when concrete is authorized to be placed directly against excavated surfaces, establish clear space at sides of excavation to facilitate form construction and removal and provide for excavation protective support system.
3. Notify City’s Representative and request inspection of foundation subgrade upon completion of structure excavations.
4. Do not place concrete or masonry foundation material until foundation subgrade preparation has been accepted by City’s Representative.
5. Where concrete is to be placed on original ground without subgrade preparation, do not use machinery using teeth nearer than 3” from finished subgrade. a. Remove last 3” without disturbing subgrade.
1-22-dp
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 3-22-dp 31 23 00 - Excavation and Fill - 15 of 21
M. Place structural backfill as follows:
1. Do not place backfill until structure footings, retaining walls, or other portions of structure or facility have been inspected by City’s Representative and accepted for backfilling.
2. Do not place backfill until concrete has developed specified 28-day compressive strength.
3. Place backfill in horizontal layers, moistened and tamped, rolled or otherwise compacted.
4. Take care when backfilling to obtain adequate compaction beneath pipes and to avoid injury or displacement of such pipes.
5. Place backfill so no additional unbalanced loading occurs during placing.
N. Water settling or jetting will not be permitted.
O. Trench excavation and backfill for pipelines, pipeline structures, and conduits shall proceed as follows:
1. Alignment and grade for pipe shall be as shown.
a. When flow line is shown, it shall be invert or interior bottom of pipe. b. When top of pipe is shown, it shall be exterior of pipe barrel. c. In absence of such profile grade, pipe shall be laid on straight grade to permit complete drainage and to provide ≥36” of cover to finish ground or street subgrade unless otherwise shown.
2. Store excavated material only in Work area.
a. Weight of material stored at trench side shall not exceed surcharge loads used to prepare shoring and bracing calculations.
3. Where natural ground above pipeline trench has been overexcavated and/or pipeline is to be placed in new embankment, place and compact embankment material to elevation ≥12” above top of pipe prior to trench excavation.
4. Except where specified otherwise in Contract Documents or permits or where documented acceptance is obtained from City’s Representative; length of open trench shall be ≤500’ or distance necessary to accommodate amount of pipe installed in 1 day, whichever is greater.
a. Distance is collective length, including open excavation, pipe laying, and appurtenance construction and backfill which has not been temporarily resurfaced. b. Complete backfilling and temporary paving so no more than 500’ of trench is open in rear of pipe being laid.
c. Backfill or use trench plates to bridge excavations at sidewalk, driveway, alley, and other travelled crossings to provide safe access and egress at completion of each day’s Work.
5. Failure of Contractor to comply with specified limitations may result in order to halt Work until such time as compliance is achieved.
P. Unless otherwise shown, minimum and maximum pipe trench width measured at top of pipe zone (12” above pipe crown) shall be as shown below, where D=nominal pipe diameter.
PRESSURE
PIPE
MATERIAL
APPLICABLE
SPECIFICATION
NOMINAL PIPE SIZE
(INCHES)
SIDE CLEARANCE (INCHES)
MINIMUM MAXIMUM
Ductile Iron
Pipe
AWWA C600
§4.3.2.3 and
AWWA M41
All sizes 12” as shown on plans
Steel Pipe AWWA C604
§4.4.2.3
and AWWA M11
All sizes 6” or as shown on plans as shown on plans
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 3-22-dp 31 23 00 - Excavation and Fill - 16 of 21
PVC Pressure
Pipe
AWWA C605
AWWA M23
≤ 16” 8” 12”
18”-30” 6”+D/8 18”
> 30” As shown on plans
Q. If maximum trench width is exceeded on either side of pipe at top of pipe zone, provide 1 of the following remedial measures at no additional cost to City.
1. Backfill trench with material specified for “Backfill for Over-Excavation” in Part 2 above to cradle pipe to spring line, or
2. Modify bedding based on calculations accepted by City’s Representative to accommodate wider trench width, or
3. Substitute higher-strength pipe based on calculations accepted by City’s Representative to accommodate wider trench width.
R. Trench widths above top of pipe zone may exceed tabulated values but shall not undercut adjacent structures.
1. Edge of top of trench shall be set back ≥ 18” from footings or structures.
S. Prepare trench bottom as follows:
1. Grade trench bottom to provide smooth, firm, and stable foundation at every point throughout length of pipe.
2. Shape pipe subgrade to fit pipe bottom using drag template or other suitable method. a. Excavate holes at joints to permit proper assembly and joint inspection. b. At pipe joints, recess and shape trench bottom to relieve pipe bells, sockets, collars, couplings, or flanges of load.
T. When placing concrete cradles, arches, or encasements within sheeted trenches, face sheeting against which concrete is placed with 1 or more thicknesses of building paper.
1. Withdraw sheeting without damaging or displacing concrete Work.
U. Backfill over pipe as follows:
1. After pipe has been properly laid, and exterior joints grouted and inspected, begin backfilling operations using material as specified above.
2. Place material in pipe zone as follows:
a. Hand-place material on pipe underside taking care to prevent lateral movement during subsequent backfilling.
b. For plastic pipe and fittings, place crushed rock bedding materials as shown by slicing, shovel-spading, or shover rodding to fill haunch areas below pipe. c. Place material around and underneath pipe so pipe barrel is fully supported along full pipe length with no voids or uncompacted areas beneath pipe. d. Unless sheeting or shoring is to be cut off and left in place, remove sheeting or shoring from pipe zone before compacting pipe zone material and placing backfill. e. Immediately backfill voids left by removal of sheeting, piles and sheeting supports with clean sand vibrated into place to ensure dense and complete filling of voids. f. Place and compact pipe zone material simultaneously on both sides of pipe for full trench width, moistened as required to achieve specified compaction. g. Keep level of backfill same on each side.
h. Compact material within pipe zone using hand-directed mechanical tampers. i. Contractor will be held responsible for displacements of pipes or other structures, damage to them or instability caused by improper depositing of backfill material or improper use or handling of tools or equipment.
1-22-dp
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 3-22-dp 31 23 00 - Excavation and Fill - 17 of 21
j. Place warning and locator tape at distance above top of pipe specified above. k. Take care in backfilling to avoid damage to pipe coating, locating tape and conduits installed in pipe zone.
l. Complete pipe zone compaction before covering it with trench zone material.
3. Place material in trench zone as follows:
a. Deposit trench zone material onto backfill previously placed in pipe zone. b. Do not permit free fall of material until ≥2’ of cover is provided over top of pipe. c. Do not drop sharp, heavy pieces of material directly onto pipe or tamped material around pipe.
d. Compact trench backfill to specified compaction using hand-directed mechanical tampers.
e. Do not use jetting or flooding without written acceptance from City’s Representative. f. Do not use impact, free-fall, hammer, or “stomping” equipment except where pipe Manufacturer warrants in writing such methods will not damage their pipe. g. Do not use axle-driven or tractor compaction equipment within 5’ of pipelines, walls, or structures.
4. Place material in street zone in accordance with requirements of and to satisfaction of agency having jurisdiction.
a. Backfill in traveled ways and public streets shall conform to right-of-way agreement, encroachment permit, excavation permit or applicable regulations of agency having jurisdiction over traveled way.
b. In absence of such provisions, compact soil by accepted hand-, pneumatic or mechanical-type tampers.
5. Backfill pipe located in public traveled right-of-way at end of each day’s operations in accordance with applicable permit requirements.
6. Construct pavement section in accordance with Contract Documents.
7. Remove spoil piles from traffic lanes by end of Working Day.
8. Mechanical densification or compaction of backfill shall use means listed in table below or combination thereof.
a. Method or methods used shall result in obtaining compaction of backfill in various specified zones and within maximum lifts specified.
b. Densification or compaction method or methods used shall not damage pipe, adjacent ground, existing improvements, or improvements installed as part of Work. c. Some encroachment permits, work permits, or excavation permits limit methods of densification or compaction.
d. Place material for mechanically compacted backfill in lifts which, prior to compaction, shall not exceed depths specified for various methods or equipment types.
TYPE OF COMPACTION EQUIPMENT MAXIMUM LIFT DEPTH
WORK IN TRENCHES
Hand-directed mechanical tampers ≤6” in pipe zone, ≤8” elsewhere.
Vibratory equipment with smooth contact surface ≤8” in street zone ≤12” in pipe zone, ≤12” elsewhere Rolling equipment, including, sheepsfoot (vibratory and nonvibratory), grid, segmented wheel, pneumatic, or
vibratory-interrupted surface equipment
≤8” in street zone ≤12” in pipe zone, ≤12” elsewhere
WORK OUTSIDE TRENCHES
Hand-directed mechanical tampers ≤8”
Work ≤30” below surface to be paved ≤8” all methods
Impact, free-fall, or "stomping" equipment ≤36”
(Do not use over concrete pipe, cement-mortar lined
pipe, VCP, or PVC.
Vibratory equipment with smooth contact surface ≤ 24”
1-22-dp
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 3-22-dp 31 23 00 - Excavation and Fill - 18 of 21
Rolling equipment, including, sheepsfoot (vibratory and nonvibratory), grid, segmented wheel, pneumatic, or
vibratory-interrupted surface equipment
≤12”
V. Backfill over and around trench structures as follows:
1. Allow concrete to cure for the following durations before backfilling:
OPERATION LOCATION
Against Sides of Structures Over Top of Structures
Placing Loose Backfill 5 days 21 days
Compacting or Densifying Backfill 7 days 28 days or 100% of specified f’c
2. Where City’s Representative determines it is not practical to obtain required compaction around structures by mechanical methods or jetting, provide trench backfill slurry or controlled low-strength material as directed.
3.3 Field Quality Control
A. City’s Representative will provide continuous inspection of fill and will field test fill and earth backfill as placed and compacted, and inspect excavations and subgrade before concrete is placed and provide periodic inspection of open excavations, embankments, and other cuts or vertical surfaces of earth.
B. City’s Representative will observe and test fills and based on laboratory results will determine whether fills have been placed in accordance with Contract Documents.
C. City’s Representative may require deepening of footings and order such deepening based on uncovered soil conditions.
D. Where excavated material is not suitable for backfill, arrange for and furnish suitable imported backfill material capable of attaining specified relative density.
1. Take reasonable measures, to protect excavated material from excessive moisture. a. Measures shall include minimizing excavation during wet weather, directing runoff away from excavations, dewatering where specified, and covering excavated material with tarps or plastic during rain.
2. If excavated material is found unsuitable due to high moisture content, process or dry material to reduce moisture content to optimum condition or remove wet material and replace with suitable material.
3. If high moisture content is not due to Contractor’s actions or inactions in protecting Work during construction, and if resulting quantity of unsuitable material exceeds that stipulated in Section 01 22 00, an adjustment in payment will be negotiated
4. Arrange for removal and legal off-site disposal of unsuitable excavated material.
E. Additional field testing of earthwork shall include:
ITEM TEST FOR
TEST STANDARD
(ASTM OR OTHER
TEST STANDARD) FREQUENCY
FIRST
TEST PAID
FOR BY
RETESTS
PAID FOR BY
MATERIALS TESTING
Trench
Subgrade
Suitability of
Subgrade
No unacceptable
materials beneath pipe
base
As directed City City
Backfill or Soil
Prepared in
Place
Sampling ASTM D75 As directed City Contractor
Sieve Analysis ASTM C136 or
California Test Method
202
1 sample for every 1000
tons of material from an
individual material
supplier
City Contractor
Sand
Equivalence
California Test Method
217
1 sample for every 1000
tons of material from an
individual material
supplier
City Contractor
1-22-dp
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 3-22-dp 31 23 00 - Excavation and Fill - 19 of 21
ITEM TEST FOR
TEST STANDARD
(ASTM OR OTHER
TEST STANDARD) FREQUENCY
FIRST
TEST PAID
FOR BY
RETESTS
PAID FOR BY
R-Value California TestMethod
301
1 sample for every 1000
tons of material from an
individual material
supplier
City Contractor
Concrete
Slurry
Slump (≤6”) ASTM C143 1 each batch City Contractor
FIELD DIMENSIONS
Trenching and
Excavation
Trench Width Width specified in Part
2 above
As directed City Contractor
Bedding
Thickness
Depth specified in Part
2 above
As directed City Contractor
Rock Size in
Backfill
Size specified in Part 2
above
As directed City Contractor
COMPACTION TESTING
Backfill or Soil
Prepared in
Place
Compaction
(Laboratory
Maximum
Density/
Optimum
Moisture
Graph)
ASTM D1557 or
California Test Method
216
1 sample for each soil
type encountered
City Contractor
Field Density of
Soil in Place
ASTM D1556 or
ASTM D6938
As directed, at intervals
≤ each 2’ layer of vertical
rise, ≤ each 1000 cy
compacted fill, and ≤
each 100’ length of
trench
City Contractor
Field Density of
Soil in Place
Compaction
and Water
Content
(Nuclear
Gauge)
California Test Method
231
As directed, at intervals
≤ each 2’ layer of vertical
rise, ≤ each 1000 cy
compacted fill, and ≤
each 100’ length of
trench
City Contractor
Field Density of
Soil in Place in
Narrow
Trenches
ASTM D2937 As directed, at intervals
≤ each 2’ layer of vertical
rise, and ≤ each 100’
trench
City City
Field Density of
Cohesionless
Soils
ASTM D4253 and
D4254
As directed, at intervals
≤ each 2’ layer of vertical
rise, ≤ each 1000 cy
compacted fill, and ≤
each 100’ length of
trench
City Contractor
ROUGH AND FINISH GRADE ELEVATIONS
Rough Grade Deviation from
Plan Elevation
≤0.10’ vertical
deviation from Plan
elevation
All rough graded areas Contractor Contractor
Finish Grade Deviation from
Plan Elevation
≤½” vertical deviation
from Plan elevation
All finish graded areas Contractor Contractor
Finish Grade
on Slopes and
Embankments
Deviation from
Plan Elevation
(Earth)
≤6” vertical deviation
from plan elevation on
graded slopes for
earth
All earthen slopes Contractor Contractor
1-22-dp
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 3-22-dp 31 23 00 - Excavation and Fill - 20 of 21
ITEM TEST FOR
TEST STANDARD
(ASTM OR OTHER
TEST STANDARD) FREQUENCY
FIRST
TEST PAID
FOR BY
RETESTS
PAID FOR BY
Paved Areas 11-Month
Warranty
Inspection
Demonstrate no visible
pavement sags above
pavement cut
1 inspection City Contractor
F. City’s Representative may modify ASTM D1557 at their option to calculate relative compaction based on adjusted laboratory maximum wet density calculated as follows:
Da=100Dm/(100 ±Wa) where:
Da = Adjusted laboratory maximum wet density
Dm = Maximum wet density per ASTM D1557
±Wa = % change in moisture content from field moisture to laboratory optimum moisture.
Use - when field moisture content is > laboratory optimum moisture content.
Use + when field moisture content is < laboratory optimum moisture content.
G. Compaction shall be deemed to conform to Contract Documents when ≤1 test of 3 consecutive tests falls below specified relative compaction.
1. Failing test shall be ≤3 percentage points below specified compaction.
2. Contractor shall pay costs of retesting of Work not conforming to Contract Documents.
3. Allow sufficient time for testing and evaluation of results before material is needed. a. City’s Representative will be sole and final judge of suitability of materials.
4. Do not use materials in question pending test results.
H. Remove unsatisfactory material, recompact, adjust moisture or compaction methods, place new material, and perform other operations necessary to meet Contract requirements as directed by City’s Representative whose decisions and directions will be considered final on these matters.
I. City’s Representative will not provide and is not being paid to provide directions or submittal review regarding Contractor’s excavation safety procedures.
1. Questions or concerns of City’s Representative will be referred to CAL/OSHA whose decisions or directions shall be considered final.
3.4 Protection
A. Refer to Section 01 35 26 for requirements for excavation safety.
3.5 Adjusting and Cleaning
A. Remove and dispose of surplus excavated material off-site and outside right-of-way or easements, unless otherwise provided for in Contract Documents.
B. Disposal shall conform to ordinances and regulations of governmental agencies having jurisdiction and shall be done at no cost or liability to City.
C. Do not deposit excavated material on private property unless written permission from property owner is secured by Contractor.
1. Before City will accept Work as being completed, Contractor shall file written release signed by property owners with whom they have entered into agreements for disposal of surplus excavated material absolving City from liability connected therewith.
D. Do not deposit excess material in water courses or other locations where disposed material will interfere with natural drainage.
E. After backfill is completed, dress site smooth and leave site in neat and presentable condition, free of cleared vegetation, rubbish and other construction wastes. 1-22-dp
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 3-22-dp 31 23 00 - Excavation and Fill - 21 of 21
F. Haul away and legally dispose of surplus rock or other excavated material which cannot be used for backfill.
G. Hand rake areas next to structures where blade-type equipment cannot.
END OF SECTION
1-22-dp
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 1-22-dp 31 23 13 – Subgrade Preparation - 1 of 5
SECTION 31 23 13
SUBGRADE PREPARATION
PART 1 - GENERAL
1.1 Work Included
A. Preparation of natural, filled, or excavated roadbed material before placing subbase or base material, pavement, curbs, gutters, driveways, sidewalks, flatwork and other roadway structures.
B. Work shall include:
1. Compliance with State and Federal safety regulations.
2. Compliance with applicable agencies’ permit conditions for Work in public or railroad rightof-way, and for Work on private property.
3. Maintaining trees which are not permitted to be removed.
4. Rough and fine grading, and preparation of right-of-way.
5. Weed abatement and soil sterilant application.
6. Legal disposal of excess excavated materials.
7. Cleaning up debris, papers and loose rocks.
8. Restoring fences and other disturbed property.
9. All other incidental earthwork and supplementary operations needed to complete Work.
C. Refer to Section 31 23 00 for excavation and fill.
D. Refer to Section 31 05 50 for requirements for protecting existing utilities.
E. Refer to Section 33 01 35 for adjusting utility maintenance hole and vault frames and covers.
F. Refer to the following City of Corona standard details:
1. City of Corona Standard Detail 827 for soil preparation notes.
2. City of Corona Standard Detail 828 for weed abatement notes.
G. Conform to Standard Specifications for Public Works Construction (Greenbook) §403, applicable permits, and requirements herein.
1.2 Related Work
A. Section 01 10 01: Summary of Work and Sequence of Construction B. Section 01 33 00: Submittal Procedures
C. Section 01 40 00: Quality Requirements
D. Section 01 61 00: Common Product Requirements
E. Section 01 65 00: Product Delivery Requirements
F. Section 01 66 00: Product Storage and Handling Requirements G. Section 01 73 00: Execution
H. Section 31 05 50: Protecting Existing Utilities
I. Section 31 23 00: Excavation and Fill
1.3 Quality Assurance
A. Use adequate numbers of skilled workmen trained and experienced in necessary trades and crafts and completely familiar with specified requirements and methods for proper performance of Work of this section.
B. Applicator of weed control materials shall be licensed by State of California as Pest Control Operator and Pest Control Advisor in addition to possessing applicable subcontractor licenses.
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 1-22-dp 31 23 13 – Subgrade Preparation - 2 of 5
C. Materials and methods used for weed abatement shall conform to Federal, State, and local regulations.
1.4 References
A. Reference publications below form part of this specification to extent referenced and are referred to within text by basic designation only.
1. ASTM C143 Slump of Hydraulic Cement Concrete
2. ASTM C136 Sieve Analysis of Fine and Coarse Aggregates
3. ASTM D1556 Density and Unit Weight of Soil in Place by Sand Cone Method
4. ASTM D1557 Laboratory Compaction Characteristics of Soil Using Modified Effort
5. ASTM D4253 Maximum Index Density and Unit Weight of Soils Using Vibratory Table
6. ASTM D4254 Maximum Index Density and Unit Weight of Soils and Calculation of Relative Density
7. ASTM D6938 In-Place Density and Water Content of Soil and Soil-Aggregate by Nuclear Methods (Shallow Depth)
8. California Test Method 216 Relative Compaction of Untreated and Treated Soils and Aggregates
9. California Test Method 217 Sand Equivalent
10. California Test Method 231 Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gage
11. California Test Method 301 Resistance “R” Value of Treated and Untreated Bases, Subbases, and Basement Soils by Stabilometer
12. SSPWC Standard Specifications for Public Works Construction (Greenbook) §301-1 “Subgrade Preparation”
1.5 Submittals
A. Furnish the following submittals.
SUBMITTAL DESCRIPTION
MANUFACTURER’S LITERATURE
Permits Submit copies of permits obtained for excavation and grading required by state and local governing authorities
On City’s request, submit written permission from property owner(s) permitting legal disposal of surplus material.
Scale Broom Weed Eradication
Letter
Submit for areas at risk of Scale Broom Weed presence.
MANUFACTURER’S LITERATURE
Product Data Submit for herbicides and soil sterilants per Product Data requirements.
Submit MSDS sheets for herbicides and soil sterilants.
QUALITY ASSURANCE AND CONTROL SUBMITTALS
Certificates of Compliance For herbicides, submit certificate of registration with California Department of Pesticide Regulation
B. Refer to Section 01 33 00 for definition of requirements for Product Data.
1.6 Delivery, Storage, and Handling
A. Refer to Sections 01 65 00 and 01 66 00 for delivery, storage, and handling requirements.
1.7 Project Site Conditions
A. Refer to Section 01 10 01 for full list of project site conditions.
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 1-22-dp 31 23 13 – Subgrade Preparation - 3 of 5
PART 2 - PRODUCTS
2.1 Acceptable Manufacturers
A. Acceptable Manufacturers include:
ITEM MANUFACTURER MANUFACTURER LOCATION
Current Growth Herbicide Roundup® (Monsanto) Columbus, OH (800) 246-7219 DuPont Oust XP Wilmington, DE (800) 441-7515
Accepted equal
Pre-Emergence Herbicide Bayer Aventis Crop Science (formerly Rhône-Poulenc) “Ronstar G 50WP”
Leverkusen, DEU
DuPont Oust XP Wilmington, DE (800) 441-7515
Elanco “Surflan” Greenfield, IN (877) 352-6261
Helena Chemical Co. Pro-Mate® Pendulum® Collierville, TN (901) 761-0050 Rainbow Technology “Weedkiller” Pelham, AL (800) 637-6047 Spike® 80DF Hervicide (Dow AgroSciences) Indianapolis, IN ( Accepted equal
2.2 Materials
A. Refer to Section 01 61 00 for basic requirements for products and materials.
B. Refer to Section 31 23 00 for basic requirements for soil and backfill.
C. Materials for subgrade preparation shall be:
ITEM MATERIAL SPECIFICATION
Subgrade Suitable Soil Material Refer to Section 31 23 00.
Current Growth Herbicide Systemic non-selective herbicide Pre-Emergent Herbicide Selective herbicide to halt root growth D. Herbicides or weedkillers shall be dry, free-flowing, dust-free water-soluble chemicals.
1. Herbicides shall inhibit growth of vegetation including dawny brome grass, puncture vine, plantain, and scale broom weed.
2. Herbicides shall be approved for use on Work by governmental agencies having jurisdiction, including US EPA and California Department of Pesticide Regulation.
PART 3 - EXECUTION
3.1 Preparation
A. Remove and reconstruct asphalt paving improvements per Greenbook Requirements.
3.2 Installation
A. Refer to Sections 01 73 00 and 01 73 33 for basic execution and installation requirements.
B. The following installation standards shall be followed:
1. Requirements of contract-referenced soils reports and investigations.
2. Applicable OSHA and Cal OSHA regulations
3. California Building Code Chapter 18 “Soils and Foundations.”
4. Manufacturer’s installation and warranty requirements
5. Standard Specifications for Public Works Construction (Greenbook) §301-1 “Subgrade Preparation”
6. Other applicable building code requirements
C. Refer variances between above documents and Contract Documents to City’s Representative.
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 1-22-dp 31 23 13 – Subgrade Preparation - 4 of 5
D. Earthwork within public rights-of-way controlled by a state, county or city, or earthwork within railroad rights-of-way shall be in accordance with requirements and provisions of permits issued by those agencies for construction within their respective rights-of-way.
1. Such permit requirements and provisions which are more restrictive than those specified herein, shall take precedence and supersede provisions of Contract Documents.
E. Refer to Section 31 23 00 for requirements for grading and unclassified excavation, placement of unclassified fill, and compaction of subgrade.
F. Excavate and shape subgrade to line, grade, and cross section shown.
1. Subgrade shall be considered to extend over full width of excavated areas or areas receiving base course.
2. Subgrade depth (street zone) shall be considered to extend to 30” below finished road surface.
G. Scarifying and cultivating will be required in the following cases
1. For dry soils impervious to water penetration.
2. For soils containing excessive moisture which may result in unstable foundations.
3. For soils which are nonuniform in character which may result in nonuniform relative compactions and subsequent differential settlements of finished surfaces.
4. When pavement is to be placed directly over roadbed material.
H. Scarify and cultivate as follows
1. After completing rough grading, loosen roadbed to depth of ≥ 6”.
2. Work loosened material to finely divided condition.
3. Remove rocks >3” diameter.
4. Bring moisture content to -1% of optimum or wetter by adding water, adding and blending dry suitable material, or by drying existing material.
5. Compact material to specified relative compaction using City-accepted equipment.
6. Compacted and trimmed material shall be firm, hard, and unyielding.
I. When scarifying and cultivating are not required, prepare subgrade as follows:
1. Bring moisture content of top 6” of subgrade material to optimum by adding water at surface.
2. Compact material to specified relative compaction using City-accepted equipment.
3. Compacted and trimmed material shall be firm, hard, and unyielding.
J. Apply herbicides as follows:
1. Treat vegetation to be exterminated and removed with current growth herbicide in accordance with Manufacturer’s Instructions.
2. Treat finished subgrade of specified areas with accepted pre-emergent herbicide. a. Apply pre-emergent herbicide in liquid or dry form at uniform rate ≥8 ounces per square yard in accordance with Manufacturer's directions.
b. At option of City’s Representative, area shall then be lightly sprinkled with water to prevent loss of herbicide or scuffing.
3. Areas to receive soil sterilant include areas to receive asphalt concrete or Portland cement concrete structures and pavement, including embankments, walkways, slabs, drainage structures, parking, and road areas.
a. Other areas requiring soil sterilant are storage reservoir or pond surfaces to receive lining material of less than 3” in thickness and lining perimeter areas to distance of 5’ from edge of lining material.
b. When treating paved areas, apply herbicides to full width of excavaded or graded areas.
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 1-22-dp 31 23 13 – Subgrade Preparation - 5 of 5
4. Apply herbicidal products according to Manufacturer’s installation and warranty requirements.
5. Refer variances between Manufacturer’s application instructions and Contract Documents to City’s Representative.
K. Scale Broom Weed Eradication
1. Prior to construction of public improvements a letter will be required from qualified botanist, plant taxonomist, or field biologist specializing in native plants stating an investigation and/or eradication of Lepidospartum Aquamatum (Scale Broom Weed) has been completed.
3.3 Field Quality Control
A. Field testing of subgrade preparation shall include:
ITEM TEST FOR
TEST STANDARD
(ASTM OR OTHER
TEST STANDARD) FREQUENCY
FIRST
TEST PAID
FOR BY
RETESTS
PAID FOR BY
Subgrade Compaction Refer to Section 31 23 00
Subgrade
Tolerances
Beneath
Pavement,
Sidewalk, Curb,
Gutter,
Driveways, or
Structures
Deviation from
Plan Grade
and Cross
Section.
±¼” maximum
deviation from Plan
Elevation
All locations Contractor Contractor
Subgrade
Tolerances
Beneath
Subbase or
Base Material or
for Unpaved
Areas
Deviation from
Plan Grade
and Cross
Section.
±½” maximum
deviation from Plan
Elevation
All locations Contractor Contractor
Finish Grade Deviation from
Plan Grade
and Cross
Section
Refer to Section 31 23 00
B. Remove unsatisfactory material, recompact, adjust moisture or compaction methods, place new material, and perform other operations necessary to meet Contract requirements as directed by City’s Representative whose decisions and directions will be considered final on these matters.
3.4 Adjusting and Cleaning
A. Remove and dispose of surplus excavated material off-site and outside right-of-way or easements, unless otherwise provided for in Contract Documents.
B. Disposal shall conform to ordinances and regulations of governmental agencies having jurisdiction and shall be done at no cost or liability to City.
C. Dress site smooth and leave site in neat and presentable condition, free of cleared vegetation, rubbish and other construction wastes.
D. Hand rake areas next to structures where blade-type equipment cannot reach.
END OF SECTION
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 1-22-dp 33 05 26 Utility Identification- 1 of 3
SECTION 33 05 26
UTILITY IDENTIFICATION
PART 1 - GENERAL
1.1 Work Included
A. Materials, testing, and installation of buried utility identification systems, including markers and warning tape.
B. Refer to Section 01 73 33 for identification procedures for above-ground piping, ducts, and conduit utilities.
C. Refer to Section 26 05 10 for requirements for tagging and identifying electrical circuitry.
D. Refer to City of Corona Standard Drawings 308 and 406 for requirements for warning identification tape installation.
1.2 Related Work
A. Section 01 10 01: Summary of Work and Sequence of Construction B. Section 01 33 00: Submittal Procedures
C. Section 01 40 00: Quality Requirements
D. Section 01 61 00: Common Product Requirements
E. Section 01 65 00: Product Delivery Requirements
F. Section 01 66 00: Product Storage and Handling Requirements G. Section 01 73 00: Execution
H. Section 01 73 33: Mechanical Identification
I. Section 09 90 00: Painting and Coating
J. Section 26 05 10: Common Work Results for Electrical
1.3 System Description
A. Furnish and install complete utility identification products including appurtenant mountings or connections required for compliance with Manufacturer’s installation requirements and compliance with applicable building, fire, electrical, plumbing, and mechanical codes and standards.
1.4 Quality Assurance
A. Use adequate numbers of skilled workmen trained and experienced in necessary trades and crafts and completely familiar with specified requirements and methods for proper performance of Work of this section.
1.5 References
A. Reference publications below form part of this specification to extent referenced and are referred to within text by basic designation only.
1. California Fire Code (CFC)
2. California Mechanical Code (CMC)
3. California Plumbing Code (CPC)
4. NFPA 70 National Electric Code (NEC)
1.6 Submittals
A. Furnish the following submittals.
SUBMITTAL DESCRIPTION
MANUFACTURER’S LITERATURE
Product Data Submit per Product Data requirements.
Installation Instructions Submit per Installation Instruction requirements.
SAMPLES
Material Samples Submit samples of materials proposed for use.
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 1-22-dp 33 05 26 Utility Identification- 2 of 3
SUBMITTAL DESCRIPTION
CLOSEOUT SUBMITTALS
Warranty Furnish 1-year warranty from date of final acceptance B. Refer to Section 01 33 00 for definition of requirements for Product Data, Installation Instructions, and Material Samples.
1.7 Delivery, Storage, and Handling
A. Refer to Sections 01 65 00 and 01 66 00 for delivery, storage, and handling requirements.
B. Strictly follow Manufacturer’s instructions and warranty requirements for delivery, storage, and handling of utility identification products.
1.8 Project Site Conditions
A. Refer to Section 01 10 01 for full list of project site conditions.
PART 2 - PRODUCTS
2.1 Acceptable Manufacturers
A. Acceptable Manufacturers include:
ITEM MANUFACTURER MANUFACTURER LOCATION
Detectable Warning
Tape for Installation
within 12” of Surface
Calpico, Inc “Type II” South San Francisco, CA (650) 588-2241 Blackburn Manufacturing Company Paso Robles, CA (805) 226-9100 Northtown “Hytech” Detectable Tape Huntington Beach, CA (800) 972-7274 Seton Name Plate Corporation Branford, CT (855) 772-4204 T Christy Enterprises Anaheim, CA (800) 258-4583
Terra Tape Division Griffolyn Reef Industries
Sentryline Detectable 620
Houston, TX (800) 231-2417
Accepted equal
Nondetectable Warning
Tape
Calpico, Inc “Type I” South San Francisco, CA (650) 588-2241 Blackburn Manufacturing Company Type YT Paso Robles, CA (805) 226-9100 Northtown Company Huntington Beach, CA (800) 972-7274
Seton Name Plate Corporation Branford, CT (855) 772-4204 T Christy Enterprises Anaheim, CA (800) 258-4583
Terra Tape Division Griffolyn Reef Industries Houston, TX (800) 231-2417 Accepted equal
2.2 Materials
A. Refer to Section 01 61 00 for basic requirements for products and materials.
B. Utility identification products shall identify:
FLUID WARNING TAPE MESSAGE
(BURIED UTILITIES)
IDENTIFICATION TAPE
MESSAGE (BURIED
UTILITIES)
COLOR
Recycled Water CAUTION: RECLAIMED
WATERLINE BURIED
BELOW – DO NOT DRINK
CAUTION: RECLAIMED
WATER – DO NOT
DRINK
Purple with black letters
Wastewater CAUTION: SEWER BURIED
BELOW
CAUTION: SEWER Green with black letters
OTHER
Electrical Conduit CAUTION: ELECTRIC LINE
BURIED BELOW
CAUTION: ELECTRIC Red with black letters
Other Utilities
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 1-22-dp 33 05 26 Utility Identification- 3 of 3
C. Materials for utility identification products shall be:
ITEM MATERIAL SPECIFICATION
Identification Tape Polyethylene Tensile strength ≥60lbf Locator Tape Polyethylene Tensile strength ≥60lbf
Warning Tape Polyethylene Tensile strength ≥60lbf
D. The following product design criteria, options and accessories are required:
ITEM DESCRIPTION
Identification Tape Type Nondetectable
Width 6”
Thickness 4 mils minimum
Imprint Refer to Pipe or Utility Specifications
Location Attach to pipe,
Warning and Locator Tape Type Detectable metallic-strip locator tape that can be registered by magnetic field locating device (for plastic pipe and conduit)
Nondetectable for metallic pipe and conduit
Width 6”
Thickness 4 mils minimum
Imprint Refer to Pipe or Utility Specifications
Location 12” above pipe or conduit
PART 3 - EXECUTION
3.1 Preparation
A. Examine areas and conditions under which Work of this section will be performed.
3.2 Installation
A. Refer to Sections 01 73 00 and 01 73 33 for basic execution and installation requirements.
B. Furnish and install utility identification products above new utilities and exposed existing utilities.
C. The following installation standards shall be followed:
1. Applicable OSHA and Cal OSHA regulations
2. Other applicable fire, plumbing, mechanical and electrical code requirements
3. City of Corona Standard Drawing 308 and 406 for warning identification tape installation.
4. Manufacturer’s installation and warranty requirements D. Refer variances between above documents and Contract Documents to City’s Representative.
E. Install utility identification products to tolerances recommended by Manufacturer.
3.3 Field Quality Control
A. Field testing shall include:
ITEM TEST FOR
TEST STANDARD
(ASTM OR OTHER TEST
STANDARD) FREQUENCY
FIRST
TEST PAID
FOR BY
RETESTS
PAID FOR
BY
Utility Identification
Products
Installation Visual inspection of finished
installation
1 inspection City City
END OF SECTION
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 1-22-dp 33 05 31 – Piping Joint Materials - 1 of 10
PART 1 - GENERAL
1.1 Work Included
SECTION 33 05 31
PIPING JOINT MATERIALS
A. Materials, testing, and installation of piping joint materials including bolts, nuts, washers, flange gaskets, and preparation for pipe welding.
B. Bolts and nuts for flanges, grooved or shouldered couplings, sleeve type couplings and flange coupling adaptors and harnesses shall use materials specified herein.
C. Joint materials for bell and spigot joints and adhesive or solvent-weld joints are covered in applicable sections for pipe material being joined.
D. For purposes of chemical compatibility, use the following materials for elastomers and bolts unless otherwise recommended by Manufacturer:
SOLUTION OR CHEMICAL STRENGTH TEMP. GASKET MATERIAL BOLT MATERIAL Recycled Water n/a 33°F-100°F FPM SAE Type 316 Stainless Steel Wastewater n/a 33°F-100°F FPM SAE Type 316 Stainless Steel Ammonium Sulfate (NH4)2SO4 33°F-100°F FPM SAE Type 316 Stainless Steel Sodium Hypochlorite NaOCl
Solution
9-15% 33°F-100°F FPM Viton Titanium
(Do not use C276 or SS due to
nickel content reaction)
1.2 Related Work
A. Section 01 10 01: Summary of Work and Sequence of Construction B. Section 01 33 00: Submittal Procedures
C. Section 01 40 00: Quality Requirements
D. Section 01 61 00: Common Product Requirements
E. Section 01 65 00: Product Delivery Requirements
F. Section 01 66 00: Product Storage and Handling Requirements G. Section 01 73 00: Execution
H. Section 09 90 00: Painting and Coating
I. Section 09 92 00: Galvanizing
J. Section 33 05 33 Couplings, Tie Rods, and Unions
1.3 System Description
A. Furnish and install bolts, nuts, washers and flange gaskets where required, including appurtenant structural, mechanical and/or electrical mountings or connections required for compliance with Manufacturer’s installation requirements and compliance with applicable codes and standards.
B. Coordinate drilling pattern and orientation of bolt holes between valves, appurtenances, and adjacent flanges
1.4 Quality Assurance
A. Manufacturer of pipe and fittings shall employ manufacturing methods and material formulations in use for at least 5 years.
B. City or City’s Representative shall be entitled to inspect pipes and witness manufacturing process.
C. Design flange geometry and fabricate flanged parts and fittings such that specified bolts can be field-inserted, field-assembled, field-disassembled, and removed in the field without using special tools or procedures other than standard commercial wrenches.
1. Replace defective parts whose geometry precludes simple field assembly and disassembly.
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 1-22-dp 33 05 31 – Piping Joint Materials - 2 of 10
2. Where scheduling precludes timely replacement of defective parts or fittings prior to commissioning, defective parts or fittings shall be replaced prior to release of bonds.
D. Factory testing shall include:
ITEM TEST FOR
TEST STANDARD
(ASTM OR OTHER TEST STANDARD) FREQUENCY
FIRST
TEST PAID
FOR BY
RETESTS
PAID FOR
BY
Flanges Bolt Circle
Drilling
±1/16’ diameter All flanges Contractor Contractor
Bolthole
Spacing
±1/32” circumferentially All flanges Contractor Contractor Eccentricity
of Bolt
Circle and
Facing with
Respect to
Bore
±1/32” radially All flanges Contractor Contractor
1.5 References
A. Reference publications below form part of this specification to extent referenced and are referred to within text by basic designation only.
1. ASME/ANSI B1.1 Unified Screw Threads
2. ASME/ANSI B1.20.1 (ANSI B2.1) Pipe Threads – NPT National Pipe Thread Taper
3. ASME/ANSI B16.1 Cast Iron Pipe Flanges and Flanged Fittings – Class 25, 125, 150 and 800
4. ASME/ANSI B16.4 Cast Iron Threaded Fittings
5. ASME/ANSI B16.5 Steel Pipe Flanges and Flanged Fittings (Including ratings for Class 150, 300, 400, 600, 900, 1500, and 2500)
6. ASME/ANSI B16.21 Non Metallic Flat Gaskets for Pipe Flanges
7. ASME/ANSI B16.24 Cast Copper Alloy Pipe Flanges and Flanged Fittings
8. ASME/ANSI B16.42 Ductile Iron Pipe Flanges and Flanged Fittings, Classes 150 and 300
9. ASME/ANSI B16.47 Large Diameter Steel Flanges 26”-60”
10. ASME/ANSI B18.2.1 Square and Hex Bolts and Screws (Inch Series)
11. ASME/ANSI B18.2.2 Square and Hex Nuts (Inch Series)
12. ASME/ANSI B1.20.1 (ANSI B2.1) Pipe Threads – NPT National Pipe Thread Taper
13. ASME/ANSI B31.3 Process Piping
14. ASSE 1061 Performance Requirements for Push‐Fit Fittings
15. ASTM A193 Alloy-Steel and Stainless Steel Bolting Materials for High-Temperature Service
16. ASTM A194 Carbon and Alloy Steel Nuts for High Pressure and High Temperature Service
17. ASTM A242 High-Strength Low-Alloy Structural Steel
18. ASTM A307 Carbon Steel Bolts and Studs, 60,000-psi Tensile Strength
19. ASTM A563 Carbon and Alloy Steel Nuts
20. ASTM A588 High-Strength Low-Alloy Structural Steel, up to 50ksi
21. ASTM A606 Steel, Sheet and Strip, High-Strength, Low-Alloy, Hot-Rolled and Cold-Rolled, with Improved Atmospheric Corrosion Resistance
22. ASTM A709 Structural Steel for Bridges
23. ASTM A847 Cold-Formed Welded and Seamless High-Strength, Low-Alloy Structural Tubing with Improved Atmospheric Corrosion Resistance
24. ASTM B98 Copper-Silicon Alloy Rod, Bar and Shapes
25. ASTM D2000 Classification System for Rubber Products in Automotive Applications
26. ASTM F467 Nonferrous Nuts for General Use
27. ASTM F468 Nonferrous Bolts, Hex Cap Screws, and Studs for General Use
28. ASTM F593 Stainless Steel Bolts, Hex Cap Screws, and Studs
29. ASTM F594 Stainless Steel Nuts
30. ASTM F2854 Push-Fit Crosslinked Polyethylene (PEX) Mechanical Fittings for Crosslinked Polyethylene (PEX) Pipe
31. AWWA C111 Rubber Gasket Joints for Ductile Iron Pressure Pipe
32. AWWA C115/ANSI A21.15 Flanged Ductile-Iron Pipe with Ductile-Iron or Gray-Iron Threaded Flanges
33. AWWA C151/ANSI A21.51 Ductile-Iron Pipe, Centrifugally Cast, for Water or Other Liquids
34. AWWA C200 Steel Water Pipe 6” and larger
35. AWWA C207 Steel Pipe Flanges
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 1-22-dp 33 05 31 – Piping Joint Materials - 3 of 10
36. AWWA C209 Cold-Applied Tape Coatings for Exterior of Special Sections, Connections and Fittings for Steel Water Pipelines.
37. AWWA C217 Petrolatum and Petroleum Wax Tape Coatings for Exterior of Connections and Fittings for Steel Pipelines
38. AWWA C303 Concrete Pressure Pipe, Bar-Wrapped, Steel Cylinder Type
39. AWWA C900 Polyvinyl Chloride PVC Pressure Pipe and Fabricated Fittings 4”-60”
40. MIL A907E Antiseize Thread Compund, High-Temperature
1.6 Submittals
A. Furnish the following submittals.
SUBMITTAL DESCRIPTION
MANUFACTURER’S LITERATURE
Product Data Submit per Product Data requirements.
B. Refer to Section 01 33 00 for definition of requirements for Product Data.
1.7 Delivery, Storage, and Handling
A. Refer to Sections 01 65 00 and 01 66 00 for delivery, storage, and handling requirements.
B. Store gaskets at temperature ≤70°F.
1. Do not expose to direct sunlight.
2. Store gaskets in manner permitting free air circulation around elastomer.
C. Strictly follow Manufacturer’s instructions and warranty requirements for delivery, storage, and handling of bolts, nuts, washers and flange gaskets.
1.8 Project Site Conditions
A. Refer to Section 01 10 01 for full list of project site and operational conditions.
PART 2 – PRODUCTS
2.1 Acceptable Manufacturers
A. Acceptable Manufacturers include:
ITEM MANUFACTURER MANUFACTURER LOCATION
BOLTS AND NUTS
Bolts and Nuts A&G Engineering Company Anaheim, CA (714) 630-7400 Birmingham Fastener Supply (BF) Birmingham, AL (800) 695-3511 Copper State Bolt & Nut Phoenix, AZ (800) 603-6887
Industrial Threaded Products, Inc. (wholesaler) Brea, CA (800) 976-2658 Le Jeune Bolt Co. (L) Burnsville, MN (952) 890-4482
Nucor Fasteners (n) Saint Joe, IN (260) 337-1600
Ocean State Stainless, Inc. (wholesaler) Huntington Beach, CA (714) 898-0404 Pacific Coast Bolt (wholesaler) Santa Fe Springs, CA (562) 944-9549 Portland Bolt Co. (PB) Portland, OR (800) 547-6758
Robbins Mfg. Co., Inc.(R) Fall River, MA (508) 675-2555 ShurSeal Industries (wholesaler) Edmonton, AB (780) 435-3771 Silo Fastener, Inc. (S) Kansas City, MO (816) 231-6750
St Louis Screw & Bolt Co. (SL) Saint Louis, MO (314) 389-7500 Texas Bolt Company (TB) Houston, TX (713) 869-7111
Tripac Fasteners (wholesaler) Corona, CA (951) 280-4488 Unytite, Inc. (UNY) Peru, IL (815) 224-2221
Vegas Fastener Manufacturing (VFM) Las Vegas, NV (702) 651-9222 Vulcan Rivet & Bolt Corp (V) Birmingham, AL (205) 841-2711 Western Pacific Products (wholesaler) Chino, CA (909) 591-2410 Accepted Equal
Studs Nelson Stud Welding Div. (N) Walnut, CA (909) 468-2105 Stud Welding Associates (+) Elyria, OH (440) 324-3042
Accepted Equal
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 1-22-dp 33 05 31 – Piping Joint Materials - 4 of 10
Anti-Seize Compound
for Stainless Steel Bolts
and Nuts
Anti-Seize Technology “Pure White” Franklin Park, IL (800) 991-1106 Bostik Never Seez Wauwatosa, WI (800) 726-7845
Dixon Ticonderoga Company “AS470” Lakehurst, NJ (732) 657-2255 Husk-Itt Husky Lube O-Seal Norco, CA (951) 340-4000
Loctite Dusseldorf, DEU (800) 624-7767
Permatex Hartford, CT (877) 376-2839
Ramco Specialty Products Anti-seize Huntington Beach, CA (800) 334-7071 Ramco Specialty Products TRX-Synlube Huntington Beach, CA (800) 334-7071 T Christy Enterprises, Inc Anti-seize Anaheim, CA (714) 507-3300 Accepted Equal
Rust Preventative
Coating and Lubricant
for Buried Bolts
No-Ox-Id “A Special” Sanchem / Northtown Huntington Beach, CA (714) 972-7274 Accepted equal
Buried Bolt Bituminous
Coatings for Existing
Bolts
3M Company (EC 244) St Paul, MN (888) 364-3577
Carboline Bitumastic No 50 St Louis, MO (888) 227-2654
Engard Coatings 858 Huntington Beach, CA (714) 891-4402 Protecto-Wrap Company Denver, CO (303) 777-3001
Tnemec Co (46-465 HB Tnemecol) Kansas City, KS (800) 863-6321 Accepted Equal
Fluoropolymer Coatings
for Bolts or Nuts
Metal Coatings Corp FluoroKote #1 Houston, TX (888) 371-9849 Tripac Fasteners 2000 Blue Coating System Corona, CA (951) 280-4488 Accepted Equal
FLANGE GASKETS
Flange Gaskets –
Neoprene for
Nonpotable Service with
Pressures Exceeding
150 psi
Allstate Gasket Deer Park, NY (631) 254-4050
American Biltrite Sherbrooke, PQ (888) 479-0190
Garlock / Bluegard / Coltec / United Seal & Rubber
Style 7797
Atlanta, GA (770) 729-8880
Buffalo Matting and Rubber Co. Buffalo, NY (866) 475-6494 John Crane / Smiths (3160) Cerritos, CA (562) 802-2555
JohnsManville 104 Denver, CO (800) 654-3103
ShurSeal Industries Edmonton, AB (780) 435-3771
Thermoseal / Klinger C4400 Sidney, OH (800) 990-7325
Tripac Style 2000 Corona, CA (951) 280-4488
US Pipe and Foundry “Flange-Tyte” Birmingham, AL (866) 347-7473 Western Pacific Products Chino, CA (909) 591-2410
Accepted equal
Flange Gaskets – FPM
(Viton®) for
Contaminated Soils and
Chemical Feed
Applications
incompatible with EPDM
or other elastomers
Allstate Gasket Deer Park, NY (631) 254-4050
American Biltrite Sherbrooke, PQ (888) 479-0190
ShurSeal Industries Edmonton, AB (780) 435-3771
Tripac Corona, CA (951) 280-4488
US Pipe and Foundry “Flange-Tyte” Birmingham, AL (866) 347-7473 West American Rubber Company (WARCO) Biltrite Orange, CA (714) 532-3355 Western Pacific Products Chino, CA (909) 591-2410
Accepted equal
Accepted equal
THREADED JOINT SEALANTS
Teflon Threaded Pipe
Joint Compound
Lake Chemical Company “La-Co Slic-Tite” Elk Grove Village, IL (800) 621-4025 Radiator Specialty Company RSC “Bakerseal” Indian Trail, NC (704) 821-7643 Accepted equal
Extruded Butyl Rubber
Pipe Joint Sealant
General Sealants Corporation GS-79 City of Industry, CA (626) 961-0211 Accepted equal
2.2 Materials
A. Refer to Section 01 61 00 for basic requirements for products and materials.
B. Provide new bolts, nuts, washers, and flanges when installing new valves onto existing flanges.
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 1-22-dp 33 05 31 – Piping Joint Materials - 5 of 10
C. Unless otherwise specified, materials for bolts, nuts and washers for pipe and valve assembly below ground shall be.
ITEM MATERIAL SPECIFICATION
Bolts for Underground Ferrous
Installations (Buried, or
Submersible Locations, or in
Underground Structures or
Chemical Handling Areas)
SAE Type 316
Stainless Steel “CRES”
Threads
Nuts for Underground Ferrous
Installations (Buried or in
Underground Structures)
PTFE-Coated
SAE Type 316
Stainless Steel
Mechanical Joint T-Head Bolts Corrosion-Resistant
“Cor-Ten” Type
Weathering Steel
Conform to one of the following
ASTM A242,
ASTM A588,
ASTM A606-4,
ASTM A709-50W
ASTM A847
Fy≥45-ksi Fu=75ksi, E=29000ksi)
T-head dimensions shall conform to AWWA C111
Threads Conform to ANSI/ASME B18.2.1 for Bolts
Conform to ANSI B1.1 Class 2A fit
Coarse Thread Series
Threads may be either cut or cold-formed
Mechanical Joint T-Head Mating
Nuts
Corrosion-Resistant
“Cor-Ten” Type
Weathering Steel
Conform to one of the following
ASTM A242,
ASTM A588,
ASTM A606-4,
ASTM A709-50W
ASTM A847
Heavy hexagon series
Threads Conform to ANSI/ASME B18.2.2 for Nuts
Conform to ANSI B1.1 Class 2B fit
Coarse Thread Series
Threads may be either cut or cold-formed
Coating System for New
Stainless Steel Bolts and
Washers on Flanges
Not required
Coating for New Stainless Steel
Nuts on Flanges and Mechanical
Joints
Nickel-phosphate
Undercoating plus
Blue Teflon or Xylan
Fluoropolymer Coating
PTFE, Fluorokote #1, Xylan 1424 or Equal Fluoropolymer
Coating
Dry film thickness of 1.0-1.2 mils
Coating for Existing Bolts and
Nuts
Anti-Seize Lubricant Conform to MIL A907E
Washers Washer material shall
be same as each bolt.
Provide washer for each nut.
Coating for Buried Nuts and
Bolts
Accepted
Manufacturer’s coating
listed above
1.0-1.2-mil MDFT
D. Unless otherwise specified, materials for bolts, nuts and washers for pipe and valve assembly above ground shall be.
ITEM MATERIAL SPECIFICATION
Bolts for Above-Ground Ferrous
Installations
SAE Type 316
Stainless Steel
Conform to one of the following:
ASTM A193 Grade B8M Class 1 SAE Type 316
(Fy=30ksi, Fu=75ksi, E=29000ksi)
Bolt-Head Identification Mark – “B8M”
ASTM A193 Grade B8M Class 2 SAE Type 316
(Fy≥50ksi, Fu≥90ksi, E=29000ksi)
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 1-22-dp 33 05 31 – Piping Joint Materials - 6 of 10
ITEM MATERIAL SPECIFICATION
Bolt-Head Identification Mark – “B8M”
¼”-½” shall project through tightened nut.
Heavy hexagon series
Threads Conform to ANSI/ASME B18.2.1 for Bolts
Conform to ANSI B1.1 Class 2A fit
Class 3A fit may be used for holes tapped for studs.
UNC/UNRC Coarse Thread Series
Threads may be either cut or cold-formed
Nuts for Above-Ground Ferrous
Installations
PTFE-Coated
SAE Type 316
Stainless Steel
Conform to ASTM A194, Grade 1, 2 or 2H
Heavy hexagon series
Threads Conform to ANSI/ASME B18.2.2 for Nuts
Conform to ANSI B1.1 Class 2B fit
UNC/UNRC Coarse Thread Series
Threads may be either cut or cold-formed
Coating for New Stainless Steel
Bolts and Washers
Not required
Coating for New Stainless Steel
Nuts
Nickel-phosphate
Undercoating plus
Blue Teflon or Xylan
Fluoropolymer Coating
PTFE, Fluorokote #1, Xylan 1424 or equal Fluoropolymer
Coating
Apply coating system to nut only.
Dry film thickness of 1.0-1.2 mils
Coating for New Non-Stainless
Steel Bolts, Nuts, and Washers
Nickel-phosphate
Undercoating plus
Blue Teflon or Xylan
Fluoropolymer Coating
PTFE, Fluorokote #1, Xylan 1424 or Equal Fluoropolymer
Coating
Dry film thickness of 1.0-1.2 mils
Coating for Existing Bolts and
Nuts
Antiseize Lubricant
Washers Washer material shall
be same as each bolt.
Provide washer for each nut.
E. Unless otherwise specified, materials for flange gaskets shall be.
ITEM MATERIAL SPECIFICATION
Flange Gaskets on Metallic
Flanges
Standards Conform to ANSI B16.21
Gasket ID shall match flange bore ID
Material
FPM (Viton)
ASTM D2000 HK10A10B38EF31F15Z1
Temperature Standard Class III to 300°F
Non-asbestos
Thickness ≥⅛” (SBR) or other materials
≥1/16” (PTFE - Teflon)
Working Pressure
Rating
350 psi at 150ºF
Style Full-face type with pre-punched boltholes where both flanges are flat-face.
Ring flange gaskets extending to inner edge of bolts may be used where raised-face flange is present.
Gasket surface finish shall have 16 serrations per inch 1/32” deep in concentric or spiral pattern.
Tensile Strength ≥1500 psi (neoprene)
Durometer Hardness Shore “A” of 45-55
F. Unless otherwise specified, materials for bell-and-spigot ring gaskets shall be.
ITEM MATERIAL SPECIFICATION
Bell-and-Spigot Ring Gaskets Standards Conform to ANSI B16.21 Gasket ID shall match flange bore ID
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 1-22-dp 33 05 31 – Piping Joint Materials - 7 of 10
ITEM MATERIAL SPECIFICATION
Gaskets for DIP Pipe Conform to AWWA C151
Gaskets for Steel Pipe Conform to AWWA C200
Gaskets for PVC Pipe Conform to AWWA C900
Material FPM (Viton)
ASTM D2000 HK10A10B38EF31F15Z1
Temperature Standard Class III to 300°F
Non-asbestos
Working Pressure
Rating
350 psi at 180ºF
Tensile Strength ≥15000 psi (neoprene)
Elongation at Rupture ≥350%
Durometer Hardness Shore “A” of 20-65
Compression Set ≤20% of original deflection
Method B (constant
deflection 22hrs
@158°F (lock-joint only
20 Tensile Strength
Change
≥85% of original strength
Hardness Change ≤15%
Water Absorption ≤10% volume change
Ozone Resistance No cracking in 2ppm-6ppm ozone at 25% elongation for 2 hours @100ºF
Specific Gravity 1.35-1.45
G. Unless otherwise specified, materials for threaded pipe joints shall be.
ITEM MATERIAL SPECIFICATION
Pipe Threads Threading Threaded per ANSI B1.20.
Use taper pipe threads (NPT) except internal straight
threads may be used in couplings (NPSC)
Lubricant or Joint
Compound
Teflon or Teflon Tape
Apply to male threads only
PART 3 - EXECUTION
3.1 Preparation
A. Clean and wire brush flange faces and threads of pipe, valves, bolts, studs, nuts, gaskets and pipeline equipment before assembling joints.
3.2 Installation
A. Refer to Section 01 73 00 for basic execution and installation requirements.
B. Furnish and install bolts, nuts, washers and flange gaskets at locations shown on Plans and Submittals.
C. The following installation standards shall be followed:
1. Applicable OSHA and Cal OSHA regulations
2. Applicable building, fire, plumbing, and mechanical code requirements
3. Manufacturer’s installation and warranty requirements D. Refer variances between above documents and Contract Documents to City’s Representative.
E. Do not force fit or spring pipe, conduit or equipment into place.
1. Corrective measures for cases of poor alignment shall be accepted in advance by City's Representative.
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 1-22-dp 33 05 31 – Piping Joint Materials - 8 of 10
F. Deflections at joints shall be ≤80% of Manufacturers' published tolerance limits.
G. Mitered piping joints are not permitted.
H. Nonfabricated pipe bends shall conform to ASME/ANSI B31.3 and be free from wrinkles, creases or corrugations.
I. Water pipe bends shall use approved AWWA fittings, except steel water pipe fittings in vaults or above grade may match API dimensions subject to City’s approval.
J. Cut pipe threads with sharp dies and made up with approved thread sealing compound.
1. Threads to be seal welded shall be made up dry.
2. Do not use Teflon sealers.
K. Epoxy coated pipe, valves and fittings shall be fabricated and installed without cutting, notching or welding.
L. Assemble threaded joints as follows:
1. Clean threaded pipe joints by wire brushing or swabbing.
2. Apply Teflon joint compound or Teflon tape to pipe threads before installing threaded valves.
3. Joints shall be watertight.
M. Assemble new flanges as follows:
1. Clean flange surfaces to mate with gasket, removing loose dirt, scale and detritus by wire brushing.
2. Repair pits, corrosion, dents or scratches which may make sealing impossible.
3. Inspect gasket to verify gasket is of proper material and style, free of defects or damage.
4. Inspect flange bolts and studs for proper material, size, threading and length.
5. Inspect gasket seating surfaces, each nut, each washer, and facing on which nuts will rotate.
6. Clean and lubricate bolt threads and nut contact surfaces using lubricant chemically compatible with materials involved.
7. Where flanged pipe penetrates wall or slab, provide at least 8” from wall or slab to face of flange.
8. Set pipe with flange bolt holes straddling pipe horizontal and vertical centerline.
9. Install pipe without springing, forcing, or stressing pipe or adjacent connecting valves or equipment.
10. Center gasket on flange.
11. With gasket in place, align mating flange bolt holes. a. Make sure mating flange faces are flush against gasket prior to bolt-up.
12. Insert bolts, nuts and washers.
a. Hand-tighten by hand until snug.
13. Before tightening bolts beyond hand-tight, operate adjacent valves through full range of motion to ensure clear unobstructed operation of discs and other internal parts.
14. Do not tighten bolts with impact wrenches.
a. Bolts so tightened will be inspected for galling and shall be replaced if galling is discovered.
15. Tighten bolts in sequence by 5-lbf increments following a 180° opposing sequence. a. Begin with bolt nearest 12-o’clock position, proceed to opposing bolt nearest 6-oclock position, then to 3-o’clock and 9’oclock and continue tightening in similar alternating sequence until all bolts are tight.
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 1-22-dp 33 05 31 – Piping Joint Materials - 9 of 10
16. Flange bolt torques shall be as recommended by valve, gasket, appurtenance, or pipe Manufacturer:
17. Since gaskets relax after seating, retighten non-buried bolts 24 hours after installation and pressure testing to compensate for relaxation.
18. If flanges leak under pressure testing, remove and dispose of nuts and bolts, reset or replace gasket, install new bolts and nuts, and retest joints. a. Joints shall be watertight.
19. Do not reuse bolts, nuts or gaskets from failed or disassembled flange joints.
N. Connect new flanges to existing flanges as follows:
1. Clean flange surfaces to mate with gasket, removing loose dirt, scale and detritus by wire brushing.
2. Repair pits, corrosion, dents or scratches which may make sealing impossible.
3. Inspect gasket to verify gasket is of proper material and style, free of defects or damage.
4. Inspect flange bolts and studs for proper material, size, threading and length.
5. Inspect gasket seating surfaces, each nut, each washer, and facing on which nuts will rotate.
6. Replace damaged items.
a. Replace existing bolts and nuts.
7. Clean and lubricate bolt threads and nut contact surfaces by wire brushing and using lubricant chemically compatible with materials involved.
8. Patch or repair scratches and damaged areas incurred while installing pipe.
9. Call for inspection of existing flanges by City’s Representative prior to attaching new pipe to existing pipe.
10. Install pipe without springing, forcing, or stressing pipe or adjacent connecting valves or equipment.
11. Where raised-face flange connects to flat-faced flange, provide ring-gasket filler between 2 flanges.
a. Ring-gasket filler shall be of same material as specified for gasket between flanges.
12. Center gasket(s) on flange.
13. With gasket in place, align mating flange bolt holes. a. Make sure mating flange faces are flush against gasket prior to bolt-up.
14. Insert bolts, nuts and washers.
a. Hand-tighten by hand until snug.
15. Before tightening bolts beyond hand-tight, operate adjacent valves through full range of motion to ensure clear unobstructed operation of discs and other internal parts.
16. Do not tighten bolts with impact wrenches.
a. Bolts so tightened will be inspected for galling and shall be replaced if any galling is discovered.
17. Tighten bolts in sequence by 5-lbf increments following a 180° opposing sequence. a. Begin with bolt nearest 12-o’clock position, proceed to opposing bolt nearest 6-oclock position, then to 3-o’clock and 9’oclock and continue tightening in similar alternating sequence until all bolts are tight.
18. Flange bolt torques shall be as recommended by valve, gasket, appurtenance, or pipe Manufacturer:
a. Do not exceed torques shown in ASME B16.5.
19. Since gaskets relax after seating, retighten non-buried bolts 24 hours after installation and pressure testing to compensate for relaxation.
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 1-22-dp 33 05 31 – Piping Joint Materials - 10 of 10
20. If flanges leak under pressure testing, remove nuts and bolts, reset or replace gasket, install new bolts and nuts, and retest joints.
a. Joints shall be watertight.
21. Do not reuse bolts, nuts or gaskets from failed or disassembled flange joints.
3.3 Field Quality Control
A. Field testing shall include:
ITEM TEST FOR
TEST STANDARD
(ASTM OR OTHER TEST STANDARD) FREQUENCY
FIRST
TEST PAID
FOR BY
RETESTS
PAID FOR
BY
Pipeline
Joint
Materials
Installation &
Leakage
Visual inspection of finished installation 1 inspection City City 11-month
Warranty
Inspection
Demonstrate compliance to Contract
Documents and Manufacturer’s printed
literature
1 test City Contractor
B. If flanges leak under pressure testing, loosen or remove nuts and bolts, replace flange gasket, reinstall or retighten bolts and nuts and retest joints.
1. Joints shall be watertight.
END OF SECTION
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 1-22-dp 33 05 33 – Couplings, Tie Rods, and Unions - 1 of 11 SECTION 33 05 33
COUPLINGS, TIE RODS, AND UNIONS
PART 1 - GENERAL
1.1 Work Included
A. Materials, testing, and installation of bolted sleeve-type couplings, tie rods, unions, and appurtenant joint and coating systems.
B. Refer to Section 33 05 34 for grooved and shouldered (Victaulic) style couplings.
1.2 Related Work
A. Section 01 10 01: Summary of Work and Sequence of Construction B. Section 01 33 00: Submittal Procedures
C. Section 01 40 00: Quality Requirements
D. Section 01 61 00: Common Product Requirements
E. Section 01 65 00: Product Delivery Requirements
F. Section 01 66 00: Product Storage and Handling Requirements G. Section 01 73 00: Execution
H. Section 09 90 00: Painting and Coating
I. Section 09 96 56: Epoxy Linings and Coatings
J. Section 33 05 31: Pipeline Joint Materials
K. Section 33 05 34: Grooved and Shouldered (Victaulic-Style) Couplings L. Section 33 11 20: Polyethylene Encasement for Iron Pipe, Fittings, Couplings, and Valves M. Section 33 11 33: PVC and CPVC Schedule 40, 80, and 120 Plastic Pipe
1.3 System Description
A. Furnish and install complete functional coupling, joint or joint-restraint system including appurtenant structural, and mechanical mountings, thrust restraints, or connections and coatings required for compliance with Manufacturer’s installation requirements, and compliance with AWWA and other applicable standards.
1.4 Quality Assurance
A. Use adequate numbers of skilled workmen trained and experienced in necessary trades and crafts and completely familiar with specified requirements and methods for proper performance of Work of this section.
B. Products coming into contact with potable water shall contain no more than 0.25% lead by average weight in compliance with Section 116875 of California Health and Safety Code.
C. Before ordering materials to fit outside diameters of existing pipe of uncertain dimensions, including but not limited to cast iron pipe, pipe over 16” diameter, and pipe over 50 years old, the following procedures shall be followed:
1. Excavate pipe to be joined at location coupling or restraint will be installed.
2. Field measure pipe circumference at that location.
3. Without removing pipe from service, measure outside diameters along x-axis and y-axis.
4. Verify roundness of existing pipe is within Manufacturer’s tolerances.
5. If existing pipe roundness is outside coupling or restraint Manufacturer’s tolerances, it may be necessary to cut pipe being joined and trace outside diameter template on sheet of butcher paper mounted to plywood board to allow custom fittings to be fabricated to match field pipe geometry.
D. Factory testing shall include:
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 1-22-dp 33 05 33 – Couplings, Tie Rods, and Unions - 2 of 11
ITEM TEST FOR
TEST STANDARD
(ASTM OR OTHER
TEST STANDARD) FREQUENCY
FIRST
TEST PAID
FOR BY
RETESTS
PAID FOR
BY
Bolted Sleeve-Type
Couplings and Flanged
Coupling Adaptors
Proof-of-Design
Test
Refer to AWWA C219
§5.2.2
1 prototype of
each item
Contractor Contractor
Bolted Split-Sleeve
Couplings
Proof-of-Design
Test
Refer to AWWA C227
§5.2.2
1 prototype of
each item
Contractor Contractor
Fusion-Bonded Epoxy
Linings
Holidays and Lining
Thickness
Refer to Section 09 96
56 1 each item Contractor Contractor
1.5 References
A. Reference publications below form part of this specification to extent referenced and are referred to within text by basic designation only.
1. ASME/ANSI B16.5 Steel Pipe Flanges and Flanged Fittings (Including ratings for Class 150, 300, 400, 600, 900, 1500, and 2500)
2. ASME/ANSI B16.39 Malleable Iron Threaded Pipe Unions
3. ASSE 1079 Dielectric Pipe Unions
4. ASTM A193 Alloy Steel and Stainless Steel Bolting Materials for High-Temperature Service
5. ASTM A283 Low and Intermediate Tensile Strength Carbon Steel Plates
6. ASTM A536 Ductile Iron Castings
7. ASTM C1173 Flexible Transition Couplings for Underground Piping Systems
8. ASTM D2464 Threaded Poly(Vinyl Chloride) (PVC) Plastic Pipe Fittings
9. AWWA C105 Polyethylene Encasement for Ductile-Iron Pipe Systems
10. AWWA C207 Steel Pipe Flanges for Waterworks Service – Sizes 4” through 144”
11. AWWA C111 Rubber-Gasket Joints for Ductile-Iron Pressure Pipe and Fittings
12. AWWA C219 Bolted Sleeve-Type Couplings for Plain End Pipe
13. AWWA C227 Bolted Split-Sleeve Couplings
14. AWWA C230 Stainless Steel Full-Encirclement Repair and Service Connection Clamps for 2”-12” Pipe
15. AWWA C550 Protective Epoxy Interior Coatings for Valves and Hydrants
16. AWWA M11 Steel Pipe, A Guide for Design and Installation
17. Fed Spec WW-F406
18. MSS SP123 Non-Ferrous Threaded and Solder-Joint Unions for Use with Copper Water Tube
19. NFPA 24 Installation of Private Fire Service Mains and Their Appurtenances
20. NSF/ANSI 61 Drinking Water System Components – Health Effects
21. NSF/ANSI 372 Drinking Water System Components – Lead Content (Formerly NSF/ANSI 61 Annex G)
1.6 Submittals
A. Furnish the following submittals.
SUBMITTAL DESCRIPTION
MANUFACTURER’S LITERATURE
Product Data Submit per Product Data requirements.
Show lining and coating data and thicknesses on items 4” and larger Installation Instructions Submit per Installation Instruction requirements.
CLOSEOUT SUBMITTALS
Warranty Furnish 1-year warranty from date of final acceptance B. Refer to Section 01 33 00 for definition of requirements for Product Data, and Installation Instructions,
1.7 Delivery, Storage, and Handling
A. Refer to Sections 01 65 00 and 01 66 00 for delivery, storage, and handling requirements.
B. Strictly follow Manufacturer’s instructions and warranty requirements for delivery, storage, and handling of couplings, and tie rods.
C. Refer to AWWA C219 §6 for additional requirements for delivery, storage, and handling of bolted sleeve-type couplings.
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 1-22-dp 33 05 33 – Couplings, Tie Rods, and Unions - 3 of 11
1.8 Project Site Conditions
A. Refer to Section 01 10 01 for full list of project site conditions.
PART 2 - PRODUCTS
2.1 Acceptable Manufacturers
A. Refer to City of Corona Approved List of Materials for Water Facilities for acceptable Manufacturers for sleeve-type couplings.
B. Acceptable Manufacturers for steel bolted sleeve-type couplings include:
ITEM MANUFACTURER MANUFACTURER LOCATION
Unrestrained Couplings –
Steel Bolted Sleeve Type,
for Identical Pipe Materials
on each side
Dresser Piping Specialties (Style 38) Bradford, PA (814) 362-9200 JCM Industries, Inc (Style 201) or (Style 202) Nash, TX (800) 527-8482 Romac Industries (400) or (501) Bothell, WA (800) 426-9341 Smith Blair, Inc / Xylem (Style 411) Texarkana, AR (800) 643-9705 Orange, CA (714) 505-7079
Accepted Equal
Unrestrained Couplings –
Steel Bolted Transition
Sleeve Type, for Different
Pipe Materials on each side
Dresser Piping Specialties (Style 162) or (Style
62)
Bradford, PA (814) 362-9200
JCM Industries, Inc (Style 203) Nash, TX (800) 527-8482 Romac Industries (TC400) Bothell, WA (800) 426-9341
Smith Blair, Inc / Xylem (Style 413) Texarkana, AR (800) 643-9705 Orange, CA (714) 505-7079
Accepted Equal
Unrestrained Couplings –
Insulating Sleeve Type, for
Different Metallic Pipe
Materials on each side
(Also use on Buried Metallic
Pipelines Penetrating
Concrete Structures or
Encased in Concrete)
Romac Industries (IC400 or IC501) Bothell, WA (800) 426-9341 Smith Blair, Inc / Xylem (Style 416) Texarkana, AR (800) 643-9705 Orange, CA (714) 505-7079
Accepted Equal
Unrestrained Couplings –
Steel Bolted Reducing
Sleeve Type, for Identical
Pipe Materials of Different
Diameters on Each Side
Dresser Piping Specialties (Style 62) Bradford, PA (814) 362-9200 JCM Industries, Inc (Style 204) Nash, TX (800) 527-8482 Romac Industries (RC400) Bothell, WA (800) 426-9341
Smith Blair, Inc / Xylem (Style 415) 4”-48” Texarkana, AR (800) 643-9705 Orange, CA (714) 505-7079
Accepted Equal
Restrained Couplings –
Steel Bolted Sleeve Type,
for Identical Pipe Materials
on each side
EBAA Iron (Mega-Coupling Series 3800) Eastland, TX (800) 433-1716 Romac Industries (400RG) Bothell, WA (800) 426-9341
Smith Blair, Inc / Xylem (Style 471) Texarkana, AR (800) 643-9705 Orange, CA (714) 505-7079
Accepted Equal
Restrained Couplings –
Steel Bolted Sleeve Type,
for Identical Pipe Materials of
Different Diameters on Each
Side
Smith Blair, Inc / Xylem (Style 476) Texarkana, AR (800) 643-9705 Orange, CA (714) 505-7079
Accepted Equal
C. Acceptable Manufacturers for cast or ductile iron bolted sleeve-type couplings include:
ITEM MANUFACTURER MANUFACTURER LOCATION
Unrestrained Couplings –
Cast Bolted Sleeve Type
System, for Identical or
Different Pipe Materials on
Each Side 2”-12”
Romac Industries (501) or (XR501) 4”-12” Bothell, WA (800) 426-9341 Smith Blair, Inc / Xylem (Style 461) (Quantum)
4”12”
Texarkana, AR (800) 643-9705
Orange, CA (714) 505-7079
Accepted Equal
Unrestrained Couplings – Romac Industries (Macro) 2”-12” Bothell, WA (800) 426-9341 DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 1-22-dp 33 05 33 – Couplings, Tie Rods, and Unions - 4 of 11
ITEM MANUFACTURER MANUFACTURER LOCATION
Cast Bolted Sleeve
Extended Range Type for
Identical or Different Pipe
Materials on Each Side
Smith Blair, Inc / Xylem (Style 461) (Quantum)
4”12”
Texarkana, AR (800) 643-9705
Orange, CA (714) 505-7079
Accepted Equal
Restrained Couplings – Cast
Bolted Sleeve Extended
Range Type for Identical or
Different Pipe Materials on
Each Side
Romac Industries (Alpha) Bothell, WA (800) 426-9341
Smith Blair, Inc / Xylem Texarkana, AR (800) 643-9705
Orange, CA (714) 505-7079
Accepted Equal
D. Acceptable Manufacturers for external harness-style systems include:
ITEM MANUFACTURER MANUFACTURER LOCATION
External Joint Restraint
Systems – Restraint Lug and
Eyebolt
Romac Industries Duc Lug & 90° Eye-Bolt Bothell, WA (800) 426-9341 Accepted Equal
External Joint Restraint
Systems – Restraint Plate
and Tie Rod
Smith Blair, Inc / Xylem (Style 907) Texarkana, AR (800) 643-9705 Orange, CA (714) 505-7079
Accepted Equal
E. Refer to sections for applicable pipe materials for requirements for follower-gland-type and harness-type mechanical joint restraints.
F. Acceptable Manufacturers for other coupling products, include:
ITEM MANUFACTURER MANUFACTURER LOCATION
Cam Lock Fittings Banjo Corporation Crawfordsville, IN (765) 362-7367 Central States Hose, Inc. Denver, CO (303) 321-2661
MMC International Co. Inwood, NY (516) 239-7339
Accepted Equal
Restrained End Caps –
Extended Range Type
Romac Industries (Alpha) Bothell, WA (800) 426-9341
Accepted Equal
Polyethylene Encasement
for Buried Couplings and
Appurtenances
Refer to Section 33 11 20
Tape for Polyethylene
Encasement
Refer to Section 33 11 20
PVC Compression
Couplings, Repair
Couplings, and Saddles
Refer to Section 33 11 33
Unions (Dielectric Insulating) Harrington Industrial Plastics, Inc. Chino, CA (909) 597-8641 Lochinvar
Pipe Seal and Insulator Company
Pipeline Coating and Engineering Company
Smith Blair, Inc / Xylem Texarkana, AR (800) 643-9705
Orange, CA (714) 505-7079
SpearsManufacturing Company Sylmar, CA (818) 364-1611
Zurn-Wilkins (DU) Series Paso Robles, CA (805) 226-6297 Accepted Equal
Unions (Noninsulating Brass) James Jones Company J-1528 Ontario, CA (800) 523-8618 Mueller H-15403 Chattanooga, TN (423) 209-4800
Accepted Equal
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 1-22-dp 33 05 33 – Couplings, Tie Rods, and Unions - 5 of 11
2.2 Materials
A. Refer to Section 01 61 00 for basic requirements for products and materials.
B. Materials for bolted-sleeve-type couplings shall conform to AWWA C219 and shall be:
ITEM MATERIAL SPECIFICATION
Sleeve Steel (Use in vaults,
meter boxes, structures,
and above-ground)
Conform to ASTM A283 Grade C
or carbon steel with minimum 30-ksi yield
Stainless Steel SAE Type 316
Ductile Iron (Use for
underground
applications)
Conform to ASTM A536 65-45-12
Coupling and Harness Bolts Stainless Steel Refer to Section 33 05 31.
Gasket EPDM Conform to AWWA C111
Suitable for exposure to petroleum products, solvents, and temperatures up to 180°F
Sleeve Lining (couplings 3” and
larger)
Fusion-Bonded Epoxy Refer to Section 09 96 56.
AWWA C550 12-mil minimum DFT
Not required for stainless steel sleeves
Exterior Finish Coat Fusion-Bonded Epoxy Refer to Section 09 96 56.
Not required for stainless steel sleeves
Polyethylene Encasement for
Buried Couplings and
Appurtenances
Polyethylene Sheet Refer to Section 33 11 20
C. Materials for coupling restraint systems for bolted-sleeve-type couplings or flanged coupling adaptors installed on ductile iron or PVC pipe shall be:
ITEM MATERIAL SPECIFICATION
Follower Gland Ductile Iron Conform to ASTM A536 65-45-12 Wedges Ductile Iron Single tooth, heat-treated for ductile iron applications Actuating Bolts Ductile Iron Conform to ASTM A536 65-45-18 Breakaway Nuts Carbon Steel
Cast Iron
Tie Rods - Steel Carbon Steel Conform to NFPA 24
Conform to ASTM A193 Grade B7 threaded rods.
Do not use all-thread
Galvanized Coating Conform to ASTM A123 - 3.4 mil thickness - 2.00 ounce/ft2 Tie Rods – Stainless
Steel
Stainless Steel Conform to NFPA 24
SAE Type 304 / 316
Coating for New Bolts
and Nuts
Nickel-phosphate
Undercoating
Blue Teflon or Xylan
Fluoropolymer Coating
Refer to Section 33 05 31.
Coating for Existing
Bolts and Nuts
Antiseize Lubricant Refer to Section 33 05 31.
Lubrication for AboveGround or VaultEnclosed Steel Tie-Rod or Bolt Threads
Oil and Graphite, Blue
Fluoropolymer Coating
or Accepted Valve
Manufacturer’s Antiseize Coating
Refer to Section 33 05 31.
Gland Exterior Finish
Coat
Fusion-Bonded Epoxy Refer to Section 09 96 56.
Coating on Buried Bolts
and Nuts
Mastic Refer to Section 33 11 19.
Polyethylene
Encasement for Buried
Couplings and
Appurtenances
Polyethylene Sheet Conform to AWWA C105
2 layers, 8 mils each
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 1-22-dp 33 05 33 – Couplings, Tie Rods, and Unions - 6 of 11 D. Materials for coupling restraint systems for bolted-sleeve-type couplings or flanged coupling adaptors installed on steel pipe shall be:
ITEM MATERIAL SPECIFICATION
Follower Gland Ductile Iron Conform to ASTM A536 65-45-12 Wedges Ductile Iron Single tooth, heat-treated for ductile iron applications Harness Lug Carbon Steel
Tie Rods - Steel Carbon Steel Conform to ASTM A193 Grade B7 threaded rods.
Do not use all-thread
Galvanized Coating Conform to ASTM A123 - 3.4 mil thickness - 2.00 ounce/ft2 Tie Rods – Stainless
Steel
Stainless Steel SAE Type 304 / 316
Lubrication for AboveGround Tie Rods and
Bolt Threads
Oil and Graphite, Blue
Fluoropolymer Coating
or Accepted Valve
Manufacturer’s Antiseize Coating
Refer to Section 33 05 31.
Coating on Buried Bolts
and Nuts
Mastic Refer to Section 33 11 19.
Polyethylene
Encasement for Buried
Couplings and
Appurtenances
Polyethylene Sheet Conform to AWWA C105
2 layers, 8 mils each
E. Materials for dismantling joints shall be:
ITEM MATERIAL SPECIFICATION
Dismantling Joints Construction Conform to AWWA C219 where applicable Spigot Conform to ASTM A283 Steel Grade C or
ASTM A536 Grade 65-45-12 Ductile Iron
Flange Adaptor Conform to ASTM A283 Steel Grade C or
ASTM A536 Grade 65-45-12 Ductile Iron
Gasket EPDM Grade E or Buna-N
NSF Listing Parts Exposed to
Potable Water
Provide NSF 61 listed products and conform to NSF/ANSI 372 lead threshold for potable water applications.
Flanges
Working Pressures 0-
150 psi
Ductile Iron Conform to ASME/ANSI B16.42 Class 150 Raised or plain faced Cast Iron Conform to ASME/ANSI B16.1 Class 125 Raised or plain faced Carbon Steel Conform to AWWA C207 Class D, or ANSI /ASME 16.5 Class 150 Conform to ASME/ANSI B16.47 Class 150 for valves 26” and larger Raised or plain faced
Stainless Steel Conform to AWWA C207 Class D, or ANSI /ASME 16.5 Class 150 Conform to ASME/ANSI B16.47 Class 150 for valves 26” and larger Raised or plain faced
Flanges
Working Pressures 150-
250 psi
Ductile Iron Conform to ASME/ANSI B16.42 Class 150 Raised or plain faced Carbon Steel Conform to AWWA C207 Class E, or ANSI /ASME 16.5 Class 150 Conform to ASME/ANSI B16.47 Class 150 for flanges 26” and larger Raised or plain faced
Stainless Steel Conform to AWWA C207 Class E, or ANSI /ASME 16.5 Class 150 Conform to ASME/ANSI B16.47 Class 150 for flanges 26” and larger Raised or plain faced
Flanges
Sizes 6-60”
Working Pressures 250-
300 psi
Ductile Iron Conform to ASME/ANSI B16.42 Class 300 Raised or plain faced Carbon Steel Conform to AWWA C207 Class F, or ANSI /ASME 16.5 Class 300 Conform to ASME/ANSI B16.47 Class 250 for flanges 26” and larger Raised or plain faced
Stainless Steel Conform to AWWA C207 Class F, or ANSI /ASME 16.5 Class 300 Conform to ASME/ANSI B16.47 Class 250 for flanges 26” and larger Raised or plain faced
Flanges
Working Pressures 300-
Carbon Steel Conform to ASME/ANSI B16.5 Class 300
Conform to ASME/ANSI B16.47 Class 250 for flanges 26” and larger DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 1-22-dp 33 05 33 – Couplings, Tie Rods, and Unions - 7 of 11
ITEM MATERIAL SPECIFICATION
500 psi Use ring gaskets
Stainless Steel Conform to ASME/ANSI B16.5 Class 300
Conform to ASME/ANSI B16.47 Class 250 for flanges 26” and larger Use ring gaskets
Flanges
Working Pressures
>500 psi
Carbon Steel Provide drilling pattern and gasket appropriate for temperature and class of service.
Use ring gaskets
Stainless Steel Provide drilling pattern and gasket appropriate for temperature and class of service.
Use ring gaskets
Flange Alignment Horizontal Pipelines Boltholes shall straddle horizontal and vertical centerlines of pipe run to which valves are attached.
Vertical Pipelines Boltholes shall straddle plant North-South and plant East-West centerlines of pipe run to which valves are attached.
Tie Rods – Stainless
Steel
Stainless Steel SAE Type 304 / 316
Design to withstand imposed thrust at rated working pressure.
Lining Epoxy Refer to Section 09 96 56.
Conform to AWWA C550 12 / 16-mil minimum DFT
Do not coat sealing areas and bronze or stainless steel parts.
Exterior Finish Coat Epoxy Urethane Refer to Section 09 90 00.
Polyethylene
Encasement for Buried
Couplings and
Appurtenances
Polyethylene Sheet Conform to AWWA C105
2 layers, 8 mils each
F. Materials for repair clamps shall only be used for applications with working pressures ≤150 psi and shall be:
ITEM MATERIAL SPECIFICATION
Repair Clamp Stainless Steel SAE Type 316
NSF Listing Parts Exposed to
Potable Water
Provide NSF 61 listed products and conform to NSF/ANSI 372 lead threshold for potable water applications.
G. Materials for unions shall be:
ITEM MATERIAL SPECIFICATION
Insulating Unions (Use
restricted to pipe ≤2½”
with dissimilar metals
on each side of union)
Standard Conform to ASSE 1079 and ASTM D2464
Location Provide where dissimilar pipe materials mate
Provide within 12” of regulating equipment, water heating, conditioning tanks and similar equipment requiring service by removal in manner facilitating ready removal.
Material PVC
Class Match Adjacent Pipe
Noninsulating Unions
for Potable Water
Service (Match adjacent
pipe material)
Lead-Free Brass Conform to ASTM B584, AWWA C800, NSF 61, and NSF 372 3-part with flared copper end connections where required Malleable Iron Conform to ASME/ANSI B16.39
Stainless Steel SAE Type 316 Grade B7
Noninsulating Unions
not for Potable Water
Service (Match adjacent
pipe material)
Bronze Conform to ASTM B61 or B62
3-part with flared copper end connections where required Malleable Iron Conform to ASME/ANSI B16.39
Stainless Steel SAE Type 316 Grade B7
NSF Listing Parts Exposed to
Potable Water
Provide NSF 61 listed products and conform to NSF/ANSI 372 lead threshold for potable water applications.
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 1-22-dp 33 05 33 – Couplings, Tie Rods, and Unions - 8 of 11 H. Materials for sewer transition couplings shall be:
ITEM MATERIAL SPECIFICATION
Transition Coupling -
Sewer
Elastomeric with
Stainless Steel tension
bands
Conform to ASTM C1173
I. Where pipeline pressures >150 psi, and where pipe tap for appurtenance into main >1” diameter, provide 2½” extra-heavy carbon steel coupling as outlet, and isolate fitting or appurtenance from main using 2” SAE Type 316 stainless steel bushing, 2” SAE Type 316 stainless steel nipple, and 2” type 316 stainless steel ball valve.
J. The following product design criteria, options and accessories are required:
ITEM DESCRIPTION
Rated Working Pressure 150 / 200 / 250 / 300 psi
Coating on Buried Bolts,
Nuts and Tie-Rods
Refer to Section 09 90 00.
≥2 coats
12 / 16 mils MDFT per coat
Dismantling Joints Self-Contained Restraint
Rating
Larger of 250 psi or rating of mating flanges
Dimensions No part of restraint system shall extend outside flange diameter
Bore shall match nominal pipe diameter
Tie Rod Diameter Compatible with mating flange bolt diameter Longitudinal Adjustment ≥ 1” / 4” inward adjustment, ≥1” expansion Harness for Bolted
Sleeve Type Couplings
and Flange Coupling
Adaptors
Design Stress Design harness and tie rods per AWWA M11
Tie rods shall withstand pressure without exceeding 50% of yield stress
K. Harnesses and tie-bolts or studs shall conform to AWWA M11 Table 13-6, 13-7, and 13-7A.
1. Tie rods shall withstand pressure without exceeding 50% of yield stress.
2. Minimum bolt requirements are:
TEST PRESSURE
NOMINAL
PIPE SIZE
≤150 PSI 200 PSI 250 PSI
# OF BOLTS
OR STUDS
SIZE # OF BOLTS
OR STUDS
SIZE # OF BOLTS
OR STUDS
SIZE
2” 2 ⅝ 2 ⅝ 2 ⅝
3” 2 ⅝ 2 ⅝ 2 ⅝
4” 2 ⅝ 2 ⅝ 2 ⅝
6” 2 ⅝ 2 ⅝ 2 ⅝
8” 2 ⅝ 2 ⅝ 2 ⅝
10” 2 ⅝ 2 2 2 ¾”
12” 2 ¾” 2 2 2 ⅞
14” 2 ¾” 2 2 2 1”
16” 2 ⅞ 2 2 2 1⅛”
18” 2 1” 2 2 2 1¼”
20” 2 1” 2 2 2 1¼”
24” 4 ⅞ 4 4 4 1⅛”
30” 4 1⅛” 4 4 4 1⅜”
36” 4 1¼” 4 4 4 1⅜”
L. Flanges shall conform to AWWA C207 requirements and shall mate with adjacent valves or fittings.
M. Internal bore of couplings and joints shall be as close to that of pipe system as is commercially available.
N. Coupling products referenced in this section shall be painted and coated, interior and exterior in accordance with Section 09 90 00 or 09 96 56 as applicable.
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 1-22-dp 33 05 33 – Couplings, Tie Rods, and Unions - 9 of 11 PART 3 - EXECUTION
3.1 Preparation
A. Make field measurements needed to install products before submitting shop drawings or ordering.
1. Make minor changes in dimensions and alignments as needed to avoid utilities or structural conflicts.
B. On buried couplings and assemblies, lubricate threaded parts including bolts and compression collars before assembling couplings and joints.
3.2 Installation
A. Refer to Section 01 73 00 for basic execution and installation requirements.
B. Furnish and install couplings, tie rods, flange connectors and unions at locations shown on Plans and Submittals.
C. The following installation standards shall be followed:
1. Applicable OSHA and Cal OSHA regulations
2. Applicable building, fire, plumbing and mechanical code requirements
3. Manufacturer’s installation and warranty requirements
4. AWWA M11 Steel Pipe, A Guide for Design and Installation D. Refer variances between above documents and Contract Documents to City’s Representative.
E. Couplings, tie rods, flange connectors, and unions shall be furnished and installed by Contractor at location shown on Plans and Submittals.
F. Bolting shall be completed as follows:
1. Wire brush and clean flange before joining flange.
2. Lubricate bolt threads with graphite and oil.
3. Bolt heads and nuts shall rest squarely against metal. a. Draw bolt heads and nuts tight against Work using suitable wrench ≥15” long or torque wrench set to provide similar torque.
4. Tap bolt heads with hammer while nut is being tightened. a. After being tightened, nuts shall be locked.
5. Bolts shall extend entirely through nut projecting at least ¼” but not more than ⅜” beyond outside nut face.
G. Joint deflections for unrestrained bolted sleeve-type couplings shall not exceed:
PIPE NOMINAL
DIAMETER
CENTER SLEEVE LENGTH
3.5” 4” 5” 6” 7” 10”
<2” 4.0° 4.0° 4.0° 4.0° 4.0° 4.0°
2” 4.0° 4.0° 4.0° 4.0° 4.0° 4.0°
3” n/a 4.0° 4.0° 4.0° 4.0° 4.0°
4” n/a 4.0° 4.0° 4.0° 4.0° 4.0°
6” n/a 4.0° 4.0° 4.0° 4.0° 4.0°
8” n/a 4.0° 4.0° 4.0° 4.0° 4.0°
10” n/a 4.0° 4.0° 4.0° 4.0° 4.0°
12” n/a 4.0° 4.0° 4.0° 4.0° 4.0°
14” n/a n/a 2.5° 3.0° 4.0° 4.0°
16” n/a n/a 2.5° 3.0° 4.0° 4.0°
18” n/a n/a 2.5° 3.0° 4.0° 4.0°
20” n/a n/a n/a 3.0° 4.0° 4.0°
24” n/a n/a n/a 3.0° 4.0° 4.0°
30” n/a n/a n/a 2.0° 3.0° 3.0°
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 1-22-dp 33 05 33 – Couplings, Tie Rods, and Unions - 10 of 11 36” n/a n/a n/a 2.0° 3.0° 3.0°
42” n/a n/a n/a n/a 2.0° 2.5°
48” n/a n/a n/a n/a 2.0° 2.5°
54” n/a n/a n/a n/a 1.5° 2.0°
60” n/a n/a n/a n/a 1.5° 2.0°
64” n/a n/a n/a n/a 1.5° 2.0°
66” n/a n/a n/a n/a 1.5° 2.0°
72” n/a n/a n/a n/a 1.5° 2.0°
84” n/a n/a n/a n/a n/a 1.0°
96” n/a n/a n/a n/a n/a 1.0°
108” n/a n/a n/a n/a n/a 1.0°
120” n/a n/a n/a n/a n/a 1.0°
1. Values shown above are based on that recommended by AWWA C219 Table 3.
H. Joint deflections for unrestrained split-sleeve couplings shall not exceed:
PIPE NOMINAL
DIAMETER
BODY LENGTH
3” 4” 5” 6” 8” 10” 12”
2” 5.0° 5.0° 5.0° n/a n/a n/a n/a
3” 5.0° 5.0° 5.0° n/a n/a n/a n/a
4” n/a 5.0° 5.0° n/a n/a n/a n/a
6” n/a 4.0° 4.5° 4.5° 4.0° 3.0° n/a
8” n/a 4.0° 4.5° 4.5° 4.0° 3.0° n/a
10” n/a 4.0° 4.5° 4.5° 4.0° 3.0° n/a
12” n/a 4.0° 4.5° 4.5° 4.0° 3.0° n/a
14” n/a 4.0° 4.5° 4.5° 4.0° 3.0° n/a
16” n/a n/a n/a 3.5° 3.5° 2.75° 2.5°
18” n/a n/a n/a 3.5° 3.5° 2.75° 2.5°
20” n/a n/a n/a 3.5° 3.5° 2.75° 2.5°
24” n/a n/a n/a 3.0° 3.0° 2.75° 2.5°
30” n/a n/a n/a 3.0° 3.0° 2.75° 2.5°
36” n/a n/a n/a 3.0° 3.0° 2.75° 2.5°
42” n/a n/a n/a 2.0° 2.0° 1.75° 2.0°
48” n/a n/a n/a 2.0° 2.0° 1.75° 2.0°
54” n/a n/a n/a n/a 1.5° 1.25° 1.5°
60” n/a n/a n/a n/a 1.5° 1.25° 1.5°
64” n/a n/a n/a n/a 1.5° 1.25° 1.5°
66” n/a n/a n/a n/a 1.5° 1.25° 1.5°
72” n/a n/a n/a n/a 1.5° 1.25° 1.5°
84” n/a n/a n/a n/a n/a n/a 1.0°
96” n/a n/a n/a n/a n/a n/a 1.0°
108” n/a n/a n/a n/a n/a n/a 1.0°
120” n/a n/a n/a n/a n/a n/a 1.0°
1. Values shown above are based on that recommended by AWWA C227 Table 3.
I. Provide appropriate equipment connection couplings and fittings between field piping systems and equipment inlet and outlet connections.
J. Unless otherwise shown, encase buried couplings and appurtenances with 2 layers of polyethylene wrap.
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 1-22-dp 33 05 33 – Couplings, Tie Rods, and Unions - 11 of 11
3.3 Field Quality Control
A. Field testing shall include:
ITEM TEST FOR
TEST STANDARD
(ASTM OR OTHER TEST STANDARD) FREQUENCY
FIRST
TEST PAID
FOR BY
RETESTS
PAID FOR
BY
Couplings,
Tie Rods,
Flange
Coupling
Adaptors, and
Unions
Installation &
Leakage
Visual inspection of finished installation 1 inspection City City Field
Performance
Demonstrate compliance to Contract
Documents and Manufacturer’s printed
literature
1 test Contractor Contractor
11-month
Warranty
Inspection
Demonstrate compliance to Contract
Documents and Manufacturer’s printed
literature
1 test City Contractor
END OF SECTION
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 1-22-dp 33 05 34 – Grooved and Shouldered (Victaulic Style) Couplings - 1 of 5 SECTION 33 05 34
GROOVED AND SHOULDERED (VICTAULIC-STYLE) COUPLINGS
PART 1 - GENERAL
1.1 Work Included
A. Materials, testing, and installation of grooved and shouldered couplings and appurtenant coating systems.
1.2 Related Work
A. Section 01 10 01: Summary of Work and Sequence of Construction B. Section 01 33 00: Submittal Procedures
C. Section 01 40 00: Quality Requirements
D. Section 01 61 00: Common Product Requirements
E. Section 01 65 00: Product Delivery Requirements
F. Section 01 66 00: Product Storage and Handling Requirements G. Section 01 73 00: Execution
H. Section 09 90 00: Painting and Coating
I. Section 09 96 56: Epoxy Linings and Coatings
J. Section 33 05 31: Pipeline Joint Materials
K. Section 33 05 33: Couplings, Tie Rods, Flange Connectors, and Unions
1.3 System Description
A. Furnish and install complete functional thrust-restraining grooved and shouldered coupling system including appurtenant coatings required for compliance with Manufacturer’s installation requirements, and compliance with AWWA and other applicable standards.
1.4 Quality Assurance
A. Use adequate numbers of skilled workmen trained and experienced in necessary trades and crafts and completely familiar with specified requirements and methods for proper performance of Work of this section.
B. Factory testing shall include:
ITEM TEST FOR
TEST STANDARD
(ASTM OR OTHER TEST
STANDARD) FREQUENCY
FIRST
TEST PAID
FOR BY
RETESTS
PAID FOR
BY
Fusion Bonded
Epoxy Linings
Holidays and
Lining Thickness
Refer to Section 09 96 56 1 each item Contractor Contractor
1.5 References
A. Reference publications below form part of this specification to extent referenced and are referred to within text by basic designation only.
1. ASTM A47 Ferritic Malleable Iron Castings
2. ASTM A183 Carbon Steel Track Bolts and Nuts
3. ASTM A193 Alloy Steel and Stainless Steel Bolting Materials for High-Temperature Service
4. ASTM A283 Low and Intermediate Tensile Strength Carbon Steel Plates
5. ASTM A449 Hex Cap Bolts, Screws, and Studs
6. ASTM A536 Ductile Iron Castings
7. ASTM F593 Stainless Steel Bolts, Hex Cap Screws, and Studs
8. ASTM F594 Stainless Steel Nuts
9. ASTM D2000 Classification System for Rubber Products in Automotive Applications
10. AWWA C105 Polyethylene Encasement for Ductile-Iron Pipe Systems
11. AWWA C550 Protective Epoxy Interior Coatings for Valves and Hydrants
12. AWWA C606 Grooved and Shouldered Joints
13. AWWA M11 Steel Pipe, A Guide for Design and Installation
14. NSF/ANSI 61 Drinking Water System Components – Health Effects DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 1-22-dp 33 05 34 – Grooved and Shouldered (Victaulic Style) Couplings - 2 of 5
1.6 Submittals
A. Furnish the following submittals.
SUBMITTAL DESCRIPTION
MANUFACTURER’S LITERATURE
Product Data Submit per Product Data requirements.
Also submit Product Data for grooved connector gasket compatible with pipe’s service condition.
Show lining and coating data and thicknesses on items 4” and larger Installation Instructions Submit per Installation Instruction requirements.
CLOSEOUT SUBMITTALS
Warranty Furnish 1-year warranty from date of final acceptance B. Refer to Section 01 33 00 for definition of requirements for Product Data, and Installation Instructions,
1.7 Delivery, Storage, and Handling
A. Refer to Sections 01 65 00 and 01 66 00 for delivery, storage, and handling requirements.
B. Strictly follow Manufacturer’s instructions and warranty requirements for delivery, storage, and handling of grooved and shouldered couplings.
C. Refer to AWWA C606 §6 for additional requirements for delivery, storage, and handling of grooved and shouldered couplings.
1.8 Project Site Conditions
A. Refer to Section 01 10 01 for full list of project site conditions.
PART 2 - PRODUCTS
2.1 Acceptable Manufacturers
A. Acceptable Manufacturers for grooved couplings for steel pipe include:
ITEM MANUFACTURER MANUFACTURER LOCATION
Couplings – Flexible
Grooved Type for Steel
Pipe 4”-24”
Gruv-Lok / Anvil International / Mueller Exeter, NH (603) 418-2800 Piedmont Pacific Corporation. Vista, CA (510) 434-0990
Shurjoint Piping Products Las Vegas, NV (702) 644-4492
Simplex-Grinnell / Tyco Lansdale, PA (561) 912-6387
Star Pipe Products, Inc. Corona, CA (951) 898-0770
Victaulic Company of America, Inc (Style 77) Easton, PA (610) 559-3300 Accepted Equal
Couplings – RollGrooved Type for Steel
Pipe 28”-42”
Gruv-Lok / Anvil International / Mueller Exeter, NH (603) 418-2800 Piedmont Pacific Corporation. Vista, CA (510) 434-0990
Shurjoint Piping Products Las Vegas, NV (702) 644-4492
Simplex-Grinnell / Tyco Lansdale, PA (561) 912-6387
Star Pipe Products, Inc. Corona, CA (951) 898-0770
Victaulic Company of America, Inc (Style 770) Easton, PA (610) 559-3300 Accepted Equal
B. Acceptable Manufacturers for shouldered couplings for steel pipe include:
ITEM MANUFACTURER MANUFACTURER LOCATION
Couplings –Shouldered
Type for Steel Pipe 4”-
60”
Gruv-Lok / Anvil International / Mueller Exeter, NH (603) 418-2800 Piedmont Pacific Corporation. Vista, CA (510) 434-0990
Shurjoint Piping Products Las Vegas, NV (702) 644-4492
Simplex-Grinnell / Tyco Lansdale, PA (561) 912-6387
Star Pipe Products, Inc. Corona, CA (951) 898-0770
Victaulic Company of America, Inc (Style 44 with VicRing) Easton, PA (610) 559-3300
Accepted Equal
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 1-22-dp 33 05 34 – Grooved and Shouldered (Victaulic Style) Couplings - 3 of 5 C. Acceptable Manufacturers for couplings for ductile iron pipe include:
ITEM MANUFACTURER MANUFACTURER LOCATION
Couplings – Grooved
Type for Ductile Iron
Pipe 3”-36”
Gruv-Lok / Anvil International / Mueller Exeter, NH (603) 418-2800 Piedmont Pacific Corporation. Vista, CA (510) 434-0990
Shurjoint Piping Products Las Vegas, NV (702) 644-4492
Simplex-Grinnell / Tyco Lansdale, PA (561) 912-6387
Star Pipe Products, Inc. Corona, CA (951) 898-0770
Victaulic Company of America, Inc (Style 31) Easton, PA (610) 559-3300 Accepted Equal
2.2 Materials
A. Refer to Section 01 61 00 for basic requirements for products and materials.
B. Materials for grooved and shouldered couplings shall be:
ITEM MATERIAL SPECIFICATION
Coupling Housings (Match
adjacent pipe material)
Ductile Iron Conform to ASTM A536 grade 65-45-12
Steel
Lining (couplings” 3” and larger) Fusion-Bonded Epoxy Refer to Section 09 96 56 AWWA C550 4-mil minimum DFT
Liquid Epoxy Refer to Section 09 96 56
AWWA C550 6-mil minimum DFT
Gaskets Halogenated Butyl
Rubber (Brown)
As recommended by Manufacturer for fluid conveyed
AWWA C606 and ASTM D2000
Grade M FlushSeal (do not use with petroleum products)
Nitrile Rubber (Red) As recommended by Manufacturer for fluid conveyed AWWA C606 and ASTM D2000
Grade S FlushSeal (do not use for hot water service)
Bolts and Nuts (Use same
material as flange bolts)
Carbon Steel ASTM A183 or ASTM A449
Stainless Steel ASTM F593 and F594
SAE Type 316
Exterior Finish Coat Epoxy Urethane Refer to Section 09 90 00 Polyethylene Encasement for
Buried Couplings and
Appurtenances
Polyethylene Sheet Conform to AWWA C105
2 layers, 8 mils each
C. The following product design criteria, options and accessories are required:
ITEM DESCRIPTION
Rated Working Pressure 150 psi
Do not use grooved and shouldered couplings for working pressures >100 psi.
Couplings – Grooved and
Shouldered Type on Steel Pipe
4”-24” diameter
Minimum wall thickness and other dimensions of roll-grooved steel pipe shall be as shown in AWWA C606 Table 5
Shouldered ends shall conform to AWWA C606 Type C or D with dimensions per AWWA C606 Table 6.
Couplings – Grooved and
Shouldered Type on Steel Pipe
30”-64” diameter
Pipe ends shall be shouldered per AWWA C606 Type C or D Couplings – Grooved and
Shouldered Type on DIP Pipe
4”-24” diameter
Minimum wall thickness of radius-grooved grooved DIP shall be Class 53.
Pipe walls for flexible-joint couplings shall be radius-grooved to dimensions shown in AWWA C606 Table 2.
Pipe walls for rigid-joint couplings shall be radius-grooved to dimensions shown in AWWA C606 Table 3.
Cut grooving will not be accepted.
D. Internal bore of couplings and joints shall be as close to that of pipe system as is commercially available.
E. Coupling products referenced in this section shall be painted and coated, interior and exterior in accordance with Sections 09 90 00 and 09 96 56.
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 1-22-dp 33 05 34 – Grooved and Shouldered (Victaulic Style) Couplings - 4 of 5 PART 3 - EXECUTION
3.1 Preparation
A. Make field measurements needed to install products before submitting shop drawings or ordering.
1. Make minor changes in dimensions and alignments as needed to avoid utilities or structural conflicts.
B. On buried couplings and assemblies, lubricate threaded parts including bolts and compression collars before assembling couplings and joints.
3.2 Installation
A. Refer to Section 01 73 00 for basic execution and installation requirements.
B. Furnish and install couplings at locations shown on Plans and Submittals.
C. The following installation standards shall be followed:
1. Applicable OSHA and Cal OSHA regulations
2. Applicable building, fire, plumbing and mechanical code requirements
3. Manufacturer’s installation and warranty requirements D. Refer variances between above documents and Contract Documents to City’s Representative.
E. Furnish and install couplings at locations shown on Plans and Submittals.
F. Install grooved-end couplings as follows:
1. Clean loose scale, rust, oil, grease, and dirt from pipe or fitting groove.
2. Apply coupling Manufacturer’s gasket lubricant to gasket exterior, lips, pipe ends, and housing interiors.
3. Tighten couplings alternately and evenly until coupling halves are seated.
4. Complete bolting as follows:
a. Lubricate bolt threads with graphite and oil.
b. Use torques recommended by coupling Manufacturer.
c. Boltheads and nuts shall rest squarely against metal. d. Draw boltheads and nuts tight against Work using suitable wrench ≥15” long or torque wrench set to provide similar torque.
e. Tap bolt heads with hammer while nut is being tightened. f. After being tightened, nuts shall be locked.
g. Bolts shall extend entirely through nut projecting ¼”-⅜” beyond outside nut face.
G. Unless otherwise shown, encase buried couplings and appurtenances with 2 layers of polyethylene wrap.
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 1-22-dp 33 05 34 – Grooved and Shouldered (Victaulic Style) Couplings - 5 of 5
3.3 Field Quality Control
A. Field testing shall include:
ITEM TEST FOR
TEST STANDARD
(ASTM OR OTHER TEST STANDARD) FREQUENCY
FIRST
TEST PAID
FOR BY
RETESTS
PAID FOR
BY
Couplings Installation &
Leakage
Visual inspection of finished installation 1 inspection City City Field
Performance
Demonstrate compliance to Contract
Documents and Manufacturer’s printed
literature
1 test Contractor Contractor
11-month
Warranty
Inspection
Demonstrate compliance to Contract
Documents and Manufacturer’s printed
literature
1 test City Contractor
END OF SECTION
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 1-22-dp 33 05 38 – Hangers and Supports - 1 of 9
SECTION 33 05 38
HANGERS AND SUPPORTS
PART 1 - GENERAL
1.1 Work Included
A. Materials, testing, and installation of hangers, supports, and modular strut systems for pipe and conduit.
B. Refer to the following sections for Work not covered herein.
1. Section 05 05 19 for post-installed concrete anchors
2. Section 05 05 23 for metal fastenings and welds
C. Refer to City of Corona Standard Drawing 418 for requirements for adjustable pipe supports for the flash mixer.
1.2 Related Work
A. Section 01 10 01: Summary of Work and Sequence of Construction B. Section 01 33 00: Submittal Procedures
C. Section 01 40 00: Quality Requirements
D. Section 01 61 00: Common Product Requirements
E. Section 01 65 00: Product Delivery Requirements
F. Section 01 66 00: Product Storage and Handling Requirements G. Section 01 73 00: Execution
H. Section 01 73 24: Seismic Restraint
I. Section 03 30 00: Cast-in-Place Concrete
J. Section 05 05 19: Post-Installed Concrete Anchors
K. Section 05 05 23: Metal Fastenings and Welds
L. Section 09 90 00: Painting and Coating
1.3 System Description
A. Furnish and install complete functional pipeand conduit hanger and support systems where shown including appurtenant mountings or connections required for compliance with Manufacturer’s installation requirements and compliance with applicable mechanical and electrical codes and standards.
1.4 Quality Assurance
A. Use adequate numbers of skilled workmen trained and experienced in necessary trades and crafts and completely familiar with specified requirements and methods for proper performance of Work of this section.
1.5 References
A. Reference publications listed below and in various sections form part of specification to extent referenced. These are referred to within text by basic designation only.
1. ASME/ANSI B31.1.0 Code for Pressure Piping
2. ASTM A36 Carbon Structural Steel
3. ASTM A123 (Hot-Dip Galvanized) Coatings on Iron and Steel Products
4. ASTM A153 Zinc Coating (Hot-Dip) on Iron and Steel Hardware
5. ASTM A193 Alloy-Steel and Stainless-Steel Bolting Materials for High-Temperature Service
6. ASTM A194 Carbon and Alloy Steel Nuts for High-Pressure and High Temperature Service
7. ASTM A240 Chromium and Chromium-Nickel Stainless Steel plate, Sheet, and Strip for Pressure Vessels and for General Applications
8. ASTM A276 Stainless Steel Bars and Shapes
9. ASTM A325 Structural Bolts, Steel, Heat Treated 120/105 ksi Minimum Tensile Strength
10. ASTM A575 Steel Bars, Carbon, Merchant Quality, M-Grades
11. ASTM A576 Steel Bars, Carbon, Hot-Wrought, Special Quality DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 1-22-dp 33 05 38 – Hangers and Supports - 2 of 9
12. ASTM A635 Steel, Sheet and Strip, Heavy Thickness Coils, Hot-Rolled, Alloy, Carbon, Structural, High-Strength, LowAlloy, and High-Strength Low-Alloy with Improved Formability
13. ASTM A653 Steel Sheet, Zinc-Coated (Galvanized) or Zinc-Iron Alloy-Coated (Galvannealed) by the Hot Dip Process
14. ASTM A1011 Steel, Sheet and Strip, Hot-Rolled, Carbon, Structural, High-Strength Low-Alloy, High-Strength Low-Alloy with Improved Formability, and Ultra-High Strength
15. ASTM A1046 Steel Sheet, Zinc-Aluminum-Magnesium Alloy-Coated by Hot Dip Process
16. ASTM A1059 Zinc-Alloy Thermo-Diffusion Coatings (TDC) on Steel Fasteners, Hardware, and Other Products
17. ASTM B6 Zinc
18. ASTM B209 Aluminum Alloy Duct Sheet
19. ASTM B221 Aluminum and Aluminum-Alloy Extruded Bars, Rods, Wire, Profiles, and Tubes
20. ASTM B633 Electrodeposited Coatings of Zinc on Iron and Steel
21. ASTM D3917 Dimensional Tolerance of Thermosetting Glass-Reinforced Plastic Pultruded Shapes
22. ASTM D4385 Visual Defects in Thermosetting Reinforced Plastic Pultruded Products
23. ASTM E84 Surface Burning Characteristics of Building Materials
24. ASTM F593 Stainless Steel Bolts, Hex Cap Screws and Studs
25. ASTM F594 Stainless Steel Nuts
26. AWS D1.1 Structural Welding Code – Steel
27. MFMA 4 Metal Framing Standards
28. MSS SP58 Pipe Hangers and Supports – Materials, Design, Manufacture, Selection, Application, and Installation
29. MSS SP69 Pipe Hangers and Supports – Selection and Application
30. MSS SP89 Pipe Hangars and Supports – Fabrication and Installation Procedures
31. California Building Code (CBC)
32. California Electrical Code (CEC)
33. California Mechanical Code (CMC)
34. California Plumbing Code (CPC)
35. NFPA 24 Installation of Private Fire Service Mains and Their Appurtenances
36. NFPA 70 National Electric Code (NEC) Article 344.30
1.6 Submittals
A. Furnish the following submittals.
SUBMITTAL DESCRIPTION
DRAWINGS AND PART SCHEDULES
Shop Drawings Submit for pipe hangers and supports per structural Shop Drawing requirements.
.
MANUFACTURER’S LITERATURE
Product Data Submit for pipe hangers and supports per Product Data requirements.
CLOSEOUT SUBMITTALS
Warranty Furnish 1-year warranty from date of final acceptance B. Refer to Section 01 33 00 for definition of requirements for Shop Drawings and Product Data.
1.7 Delivery, Storage, and Handling
A. Refer to Sections 01 65 00 and 01 66 00 for delivery, storage, and handling requirements.
B. Strictly follow Manufacturer’s instructions and warranty requirements for delivery, storage, and handling of hangers and supports.
1.8 Project Site Conditions
A. Refer to Section 01 10 01 for full list of project site conditions.
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 1-22-dp 33 05 38 – Hangers and Supports - 3 of 9
PART 2 - PRODUCTS
2.1 Acceptable Manufacturers
A. Acceptable Manufacturers include:
ITEM MANUFACTURER MANUFACTURER LOCATION
FASTENERS AND CONNECTIONS
Concrete Anchors
– Epoxy Adhesive
Anchor Systems
Refer to Section 05 05 19.
Epoxy Grout for
Anchor Bolts
Refer to Section 05 05 19.
Metal-to-Metal
Epoxy
Refer to Section 05 05 19.
HANGERS AND SUPPORTS
Plastic Pipe
Hangers
Spears Manufacturing Co “Clic Top” Sylmar, CA (818) 364-1611 Accepted Equal
Steel and
Stainless Steel
Pipe and Conduit
Hangers
Anvil International (Grinnell) Ontario, CA (603) 418-2800 Bergen-Power Pipe Supports, Inc Donora, PA (724) 379-5212 Carpenter & Paterson Company “C&P” Woburn, MA (781) 935-2950 Elcen Metal Products Company Franklin Park, IL (301) 984-6130 Empire Industries, Inc Manchester, CT (860) 647-1431
Globe Pipe Hanger Products, Inc Cleveland, OH (216) 362-6300 Michigan Hanger Company, Inc Niles, OH (330) 544-5403
Modern Pipe Supports Corporation Cleveland, OH (216) 361-1666 Cooper Industries/Eaton Nibco / Tolco / Tripac / B-Line Corona, CA (951) 280-4488 PHD Manufacturing, Inc Oceanside, CA (800) 321-2736
Powerstrut / Atkore International Harvey, IL (708) 339-1610 Superstrut / American Electric, Thomas & Betts, Inc Memphis, TN (800) 816-7809 Unistrut Corporation Atkore International Harvey, IL (800) 882-5543 Viking Corporation Hastings, MI (800) 968-9501
Wesanco Steel Products Corp La Mirada, CA (714) 739-7562 Accepted Equal
Adjustable Clevis
Hangers
Anvil International (Grinnell) Figure 260 Ontario, CA (603) 418-2800 Bergen-Power Pipe Supports, Inc Figure 100 Donora, PA (724) 379-5212 Cooper Industries/Eaton Nibco / Tolco / Tripac / B-Line B3100 Series
Corona, CA (951) 280-4488
Accepted Equal
Adjustable Pipe
Support
Bergen-Power Pipe Supports, Inc Figure 137 Donora, PA (724) 379-5212 Cooper Industries/Eaton Nibco / Tolco Figure 312 Corona, CA (951) 280-4488 Accepted Equal
Ceiling Flanges Unistrut Corporation Atkore International Type M30 or M31 Harvey, IL (800) 882-5543 Accepted Equal
Hanger Rod Anvil International (Grinnell) Figure 140 Ontario, CA (603) 418-2800 Bergen-Power Pipe Supports, Inc Figure 133 Donora, PA (724) 379-5212 Cooper Industries/Eaton Nibco / Tolco Figure 103 Corona, CA (951) 280-4488 Accepted Equal
Hanger Rod – AllThread
Anvil International (Grinnell) Figure 146 Ontario, CA (603) 418-2800 Bergen-Power Pipe Supports, Inc Figure 94 Donora, PA (724) 379-5212 Accepted Equal
U-Bolt Bergen-Power Pipe Supports, Inc Figure 283 Donora, PA (724) 379-5212 Cooper Industries/Eaton Nibco / Tolco Figure 110 Corona, CA (951) 280-4488 Accepted Equal
Welded Eyebolt
Rod
Bergen-Power Pipe Supports, Inc Figure 93 Donora, PA (724) 379-5212 Cooper Industries/Eaton Nibco / Tolco Figure 101 Corona, CA (951) 280-4488 Accepted Equal
FRAMING STRUT SYSTEMS
Galvanized Steel
Bolted Framing
Allied Tube & Conduit Harvey, IL (800) 882-5543
Cooper Industries/Eaton Nibco / Tolco / Tripac / B-Line Corona, CA (951) 280-4488 DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 1-22-dp 33 05 38 – Hangers and Supports - 4 of 9
ITEM MANUFACTURER MANUFACTURER LOCATION
Strut Systems ERICO International Corporation CADDY® Eristrut Solon, OH (440) 248-0100 Globe Pipe Hanger Products, Inc Cleveland, OH (216) 362-6300 G S Metals Corp Pinckneyville, IL (618) 357-5353
Powerstrut / Atkore International Harvey, IL (708) 339-1610 Superstrut / American Electric, Thomas & Betts, Inc Memphis, TN (800) 816-7809 Unistrut Corporation Atkore International P-1000 series Harvey, IL (800) 882-5543 Wesanco Steel Products, Inc La Mirada, CA (714) 739-7562 Accepted Equal
Continuous
Concrete Inserts
Cooper Industries/Eaton Nibco / Tolco / Tripac / B-Line Corona, CA (951) 280-4488 Powerstrut / Atkore International Harvey, IL (708) 339-1610 Superstrut / American Electric, Thomas & Betts, Inc. Memphis, TN (800) 816-7809 Unistrut Corporation Atkore International P-3200 series Harvey, IL (800) 882-5543 Wesanco Steel Products, Inc La Mirada, CA (714) 739-7562 Accepted Equal
Individual
Concrete Inserts
Cooper Industries/Eaton Nibco / Tolco / Tripac / B-Line Corona, CA (951) 280-4488 Powerstrut / Atkore International Harvey, IL (708) 339-1610 Superstrut / American Electric, Thomas & Betts, Inc Memphis, TN (800) 816-7809 Unistrut Corporation Atkore International M26 Harvey, IL (800) 882-5543 Wesanco Steel Products, Inc La Mirada, CA (714) 739-7562 Accepted Equal
Conduit Clamps Cooper Industries/Eaton Nibco / Tolco / Tripac / B-Line Corona, CA (951) 280-4488 Powerstrut / Atkore International Harvey, IL (708) 339-1610 Superstrut / American Electric, Thomas & Betts, Inc. Memphis, TN (800) 816-7809 Unistrut Corporation Atkore International Harvey, IL (800) 882-5543 Wesanco Steel Products, Inc La Mirada, CA (714) 739-7562 Accepted Equal
CorrosionResistant Alloy
Steel Bolted
Framing Strut
Systems
Unistrut Corporation Atkore International Defender® Harvey, IL (800) 882-5543 Accepted Equal
Stainless Steel
Bolted Framing
Strut Systems
Cooper Industries/Eaton Nibco / Tolco / Tripac / B-Line Corona, CA (951) 280-4488 Superstrut / American Electric, Thomas & Betts, Inc. Memphis, TN (800) 816-7809 Unistrut Corporation Atkore International Defender® Harvey, IL (800) 882-5543 Accepted Equal
Fiberglass
Channel Framing
Strut Systems
Aikenstrut Division Atkore International Harvey, IL (708) 339-1610 Champion Fiberglass “Champion Strut” Spring, TX (281) 655-8900 Strut Tech Engineered Support Systems Redmond, WA (425) 885-4403 Unistrut Corporation Atkore International Harvey, IL (800) 882-5543 Accepted Equal
2.2 Materials
A. Refer to Section 01 61 00 for basic requirements for products and materials.
B. Pipe hangers and supports shall conform to MSS SP58 and be selected and applied per MSS SP69.
C. Support system materials shall be as follows:
LOCATION CONDUIT OR PIPE
MATERIAL
SUPPORT SYSTEM NOTES
Damp Locations Stainless Steel Pipe Stainless Steel Field touch up cut ends and scratches before rust appears
PVC Pipe or Conduit PVC-Coated Steel
Wet Locations Galvanized Steel Pipe or
Conduit (ERSC)
Stainless Steel Field touch up cut ends and
scratches before rust appears
PVC-Coated Galvanized Steel
Conduit (PVC_ERSC)
Stainless Steel / PVCCoated SteelField touch up cut ends and scratches before rust appears
Stainless Steel Pipe Stainless Steel
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 1-22-dp 33 05 38 – Hangers and Supports - 5 of 9
PVC Pipe or Conduit PVC-Coated Steel Field touch up cut ends and scratches before rust appears
Corrosive Locations PVC Stainless Steel Field touch up cut ends and scratches before rust appears
D. Materials for pipe and conduit hangers and supports shall be:
ITEM MATERIAL SPECIFICATION
Stainless Steel
Continuous-Slot
Channel Framing
System
Stainless Steel Channel Conform to ASTM A240
SAE Type 304 / 316
Cold-Formed Fabrication Conform to MFMA 4
Stainless Steel Rods, Bars,
and Fittings
Conform to ASTM A240 or A276
SAE Type 304 / 316
Pipe and Conduit
Hangers (Above
Ground)
Stainless Steel SAE Type 304 / 316
Pipe and Conduit
Hangers (Below
Ground or
Exposed to Water)
Stainless Steel SAE Type 304 / 316
Ring Hangers (Use
for Single Electrical
Conduit Hangers)
Stainless Steel SAE Type 304 / 316
Dimensions Hanger rods ≥ ⅜” diameter for conduits ≤2” trade size Hanger rods ≥ ½” diameter for conduits 2½”-3” trade size Hanger rods ≥ ⅝” diameter for conduits 3½”-4” trade size Trapeze Hangers
(Use for Multiple
Pipes or Conduits
Above Ground)
Stainless Steel SAE Type 304 / 316
Dimensions 12-gauge minimum
Lipped channels ≥ 1½” x 1½”
Hanger rods ≥ ⅜” / ½” diameter
Concrete Inserts Stainless Steel SAE Type 304 / 316
Design Swivel-type for individual inserts
Dimensions 12-gauge minimum
Lipped channels ≥ 1½” x 1½”
Conduit Clamps Stainless Steel SAE Type 316
Pipe and Conduit
Hangers (Below
Ground or
Exposed to Water)
Stainless Steel SAE Type 316
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 1-22-dp 33 05 38 – Hangers and Supports - 6 of 9
E. Materials for fasteners and connections for pipe hangers and supports shall be:
ITEM MATERIAL SPECIFICATION
Bolts (Connection
Bolts and Anchor
Bolts) – Stainless
Steel
Stainless Steel Refer to Section 05 05 23
Bolts – Embedded
Eyebolts
Stainless Steel Refer to Section 05 05 23
Washers Various materials Refer to Section 05 05 23
F. The following product design criteria, options and accessories are required:
ITEM DESCRIPTION
Pipe Hangers Maximum horizontal spacing per California Plumbing Code Table 3-1 and 3-2 or Engineered Calculations except where stricter requirements are shown in Contract Documents.
Conform to latest requirements of:
ANSI Code for Pressure Piping B31.1
MSS Standard Practice SP-58, SP-69 and SP-89
Conduit Hangers Maximum horizontal spacing per California Electrical Code or Engineered Calculations except where stricter requirements are shown in Contract Documents.
Conform to latest requirements of California Electrical Code:
For conduit on concrete or masonry, use PVC-coated 1-hole malleable iron clamps with pipe spacers (clamp backs) or PVC-coated preformed galvanized steel channels.
Fasten hanger rods, conduit clamps and outlet and junction boxes to building structure using beam clamps.
Support wall-mount junction boxes, pull-box enclosures, and panels with Type 316 stainless steel preformed channels.
Supports, Anchor
Bolts, and Bolt
Embedment Design
Suitable for design loads with safety factor ≥3.
Anchor with preset inserts, epoxy-adhesive anchors, self-drilling expansion-shield anchors or machine-bolt expansion anchors on concrete surfaces.
Use preset inserts in prestressed concrete.
Anchor with SAE Type 316 stainless steel anchors.
Do not fasten supports to piping, ductwork, mechanical equipment or conduit.
Do not drill or cut structural steel members.
Unacceptable
Materials
Do not use perforated strap, iron bailing wire, or plumber’s tape for supports.
G. Unless otherwise shown, pipe support hanger rod sizes on horizontal pipe shall be:
PIPE DIAMETER ≤ ½” ¾” 1” 1¼” 1½” 2” 3” 4” 5”-8” ≥10”
Hanger Rod Diameter ⅜ ½” ⅝
H. Unless otherwise shown, pipe support spacing on horizontal pipe shall be:
PIPE DIAMETER
PIPE MATERIAL ≤ ½” ¾” 1” 1¼” 1½” 2” 3” 4” 5”-8” ≥10”
Ductile Iron Pipe ≤6’ spacing ≤8’ spacing
Schedule 40 and
Schedule 80 PVC and
ABS DWV Solvent
Cemented Joints
Under Pressure
≤3’ spacing
Provide for expansion
every 30’
≤4’ spacing
Provide for expansion every 30’
Metallic Conduit and
Wireways
≤10’ maximum spacing
I. Unless otherwise shown, pipe support spacing on vertical pipe shall be:
PIPE DIAMETER
PIPE MATERIAL ≤ ½” ¾” 1” 1¼” 1½” 2” 3” 4” 5”-8” 10”-
12”
Steel and Brass Water
or DWV Pipe
Threaded or Welded
Joints
Every other floor or grating level not to exceed 25’
Metallic Conduit and
Wireways
Each floor or grating level ≤10’
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 1-22-dp 33 05 38 – Hangers and Supports - 7 of 9
J. For temperatures other than ambient or listed temperatures and for other piping materials or wall thicknesses, calculate or modify pipe support spacing in accordance with pipe Manufacturer’s recommendations and requirements below
1. Maximum deflection of pipe shall be ≤(span/360)
2. Stress on steel pipe shall be ≤5,000 psi
3. Compute maximum span of steel pipe using formula L=√(7200tD/(32t+D))
4. Where: t=wall thickness (inches), D=diameter (inches), and L=maximum span (feet) K. Minimum spacing between conduit supports shall not exceed that shown in NEC §344.30 L. Provide supports at:
1. Changes of direction
2. Both sides of flexible pipe connections
3. Base of risers
4. Floor penetrations
5. Connections to pumps and equipment
6. Valves and appurtenances
M. Zinc coatings shall be applied by hot-dipped or electro-depositing process.
1. Zinc shall comply with ASTM B6.
N. Before leaving shop, steel not shown or specified to be galvanized or stainless shall receive 1 coat of pigmented primer recommended by Manufacturer of final paint system.
1. Parts inaccessible after assembly shall receive second coat of same primer.
2. Final painting shall be as specified in Section 09 90 00.
PART 3 - EXECUTION
3.1 Preparation
A. Make field measurements needed to fabricate and install pipe hangers and supports before submitting Shop Drawings or ordering.
1. Inspect Work area before installing.
2. If Work area conditions are unsatisfactory, do not install until completing satisfactory corrections.
3. Make minor changes in dimensions and alignments as needed to avoid utilities or structural conflicts.
B. Clean surfaces of metalwork to contact concrete, removing rust, dirt, grease and other foreign substances before concrete is placed.
C. Secure embedded metalwork accurately in position in concrete forms to minimize displacement or vibration during concrete placement.
D. Contractor, in conjunction with valve and equipment manufacturers, shall review structural design of valve anchorages shown on Plans.
1. Provide revised design as necessary based on actual loads, design, and layout of equipment supplied.
2. Design shall meet seismic requirements stated herein.
3. Revised design shall be stamped by California-licensed professional engineer.
3.2 Installation
A. Refer to Sections 01 73 00, 01 73 24, and 01 73 33 for execution and installation requirements.
B. Installers shall be fully trained and Manufacturer authorized for installation.
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 1-22-dp 33 05 38 – Hangers and Supports - 8 of 9
C. Furnish and install hangers and supports at true to line, level, and plumb at locations shown on Plans and Submittals.
D. The following installation standards shall be followed:
1. Applicable OSHA and Cal OSHA regulations
2. Applicable building, fire, plumbing, mechanical and electrical code requirements.
3. City of Corona Standard Drawing 418 for adjustable pipe supports.
4. Manufacturer’s installation and warranty requirements
5. ASME/ANSI B31.1.0 Code for Pressure Piping
6. MSS SP58 Pipe Hangers and Supports – Materials, Design, Manufacture, Selection, Application, and Installation
7. MSS SP69 Pipe Hangers and Supports – Selection and Application
8. MSS SP89 Pipe Hangars and Supports – Fabrication and Installation Procedures E. Install hangers and supports as follows:
1. Provide 2 nuts for each anchor bolt to level and hold down baseplate.
2. Following installation of vertical support pipe, adjust nuts so plate is secure and water main is true to line and grade.
3. Grade and alignment will be verified by City’s surveyor, and leveling adjusted by Contractor until supported item is held true.
4. After alignment has been verified, fill void beneath the baseplate with non-shrink grout, F. Refer variances between Manufacturer’s installation instructions and Contract Documents to City’s Representative.
G. Refer to Section 05 05 19 for anchoring and bolting requirements.
H. Refer to Section 05 05 23 for welding requirements.
I. Install conduit supports as follows:
1. Use trapeze hangers, strap hangers, wall brackets, u-bolts, clamps, pipe straps, or strut channel systems as appropriate.
a. Provide u-bolt or pipe strap at each floor or grating level of riser conduits. b. Trapeze hangers shall be sway-braced.
c. Do not use perforated strap or plumbers tape for conduit supports.
2. Clamp conduits to each trapeze hanger, at end of each run, and at each elbow.
3. Support conduit at intervals and at locations required by NEC Article 344.30.
4. Provide hangers and brackets to limit maximum uniform load on 1 support to ≤25 lbf. a. Do not exceed maximum concentrated load recommended by Manufacturer on any support.
5. Support materials shall be electrolytically compatible conduit being used.
6. Support conduit from building structure.
a. Do not support conduit from process, gas, air, or water piping, or from other conduits. b. Do not use suspended ceiling support systems to support raceways.
7. For supports at structural steel members: Use SAE Type 316 stainless steel beam clamps.
a. Drilling or welding may be used only where shown on Plans.
8. For hangers in metal roof decks:
a. Use fender washers.
b. Do not extend hardware above top of ribs.
c. Do not compromise vapor barrier, insulation, or roofing membrane.
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 1-22-dp 33 05 38 – Hangers and Supports - 9 of 9
9. Wherever conduit may be affected by dissimilar movements of supporting structures, provide flexible or expansion devices.
10. Tighten connections to their recommended torques.
11. Upon completion of fabrication, remove protective wraps and debris.
12. Repair any damage due to installation.
J. Attach pipe supports to chemical tanks using adhesive or magnetic methods.
1. No full or partial penetration of tank wall by mechanical fasteners will be permitted.
3.3 Field Quality Control
A. Field testing shall include:
ITEM TEST FOR
TEST STANDARD
(ASTM OR OTHER TEST
STANDARD) FREQUENCY
FIRST
TEST PAID
FOR BY
RETESTS
PAID FOR
BY
Pipe
Hangers
and
Supports
Support Spacing California Plumbing Code Table 3-1
and 3-2 and tables herein
All hangers
and supports
City City
Grade and
Alignment of Pipe
within Pipe
Supports
Survey - ±1/16” All hangers
and supports
City City
Snug Fit and NearEqual Distribution
of Load among
Supports
Visual inspection All hangers
and supports
City City
11-month Warranty
Inspection
Demonstrate compliance to Contract
Documents andManufacturer’s printed
literature
1 test City Contractor
END OF SECTION
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 1-22-dp 33 05 39 – Manual Valve Operators - 1 of 7
SECTION 33 05 19
MANUAL VALVE OPERATORS
PART 1 - GENERAL
1.1 Work Included
A. Materials, testing, and installation of manual valve operators.
B. Refer to the following City of Corona Standard Drawings
1. Standard Drawing 422 for requirements for valve box assemblies and stem extensions
1.2 Related Work
A. Section 01 10 01: Summary of Work and Sequence of Construction B. Section 01 33 00: Submittal Procedures
C. Section 01 40 00: Quality Requirements
D. Section 01 61 00: Common Product Requirements
E. Section 01 65 00: Product Delivery Requirements
F. Section 01 66 00: Product Storage and Handling Requirements G. Section 01 73 00: Execution
H. Section 01 73 24: Seismic Restraint
I. Section 05 05 19: Post-Installed Concrete Anchors
J. Section 09 90 00: Painting and Coating
K. Section 33 12 16: Plug Valves
L. Section 33 12 17: Ball Valves
M. Section 33 12 44: Air-Operated Actuators
N. Section 33 12 46: Electric Motor Actuators
O. Section 33 12 47: Hydraulic Cylinder Actuators
1.3 System Description
A. Furnish and install complete operating manual valve operator including appurtenant structural, mechanical and/or electrical mountings or connections required for compliance with Manufacturer’s installation requirements and compliance with applicable building, plumbing, and electrical codes and standards.
1.4 References
A. Reference publications below form part of this specification to extent referenced and are referred to within text by basic designation only.
1. ASTM A126 Gray Iron Castings for Valves, Flanges, and Pipe Fittings
2. ASTM A148 Steel Castings, High Strength, for Structural Purposes
3. ASTM A322 Steel Bars, Alloy, Standard Grades
4. ASTM B427 Gear Bronze Alloy Castings
5. ASTM D1785 Poly(Vinyl-Chloride) (PVC) Plastic Pipe, Schedules 40, 80 and 120
6. ASTM D3034 Type PSM Poly (Vinyl Chloride) (PVC) Sewer Pipe and Fittings
7. AWWA C504 Rubber-Seated Butterfly Valves 3”-72”
8. AWWA C507 Ball Valves 6”-60”
9. AWWA C515 Reduced Wall, Resilient Seated Gate Valves for Water Supply Service
10. AWWA C517 Resilient-Seated Cast-Iron Eccentric Plug Valves
11. AWWA C520 Knife Gate Valves, Sizes 2”-96”
12. AWWA C540 Power Actuating Devices for Valves and Sluice Gates
1.5 Submittals
A. Include submittals for manual valve operators in submittals for valves to which they are attached.
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 1-22-dp 33 05 39 – Manual Valve Operators - 2 of 7
-
B. Furnish the following submittals.
SUBMITTAL DESCRIPTION
DRAWINGS
Shop Drawings Submit per equipment Shop Drawing requirements .
MANUFACTURER’S LITERATURE
Product Data Submit per Product Data requirements.
Include dimensions and orientations of valve operators to operate with valve stem extensions..
Show locations of internal stops for gear actuators.
Include factory torque sheets showing torque required through opening and closure.
Installation Instructions Submit per Installation Instruction requirements
QUALITY ASSURANCE AND CONTROL SUBMITTALS
Test Record Transcripts Submit for factory tests per test record transcript requirements
CLOSEOUT SUBMITTALS
Warranty Furnish 1-year warranty from date of final acceptance C. Refer to Section 01 33 00 for definition of requirements for Shop Drawings, Product Data, Installation Instructions, and Test Record Transcripts.
1.6 Delivery, Storage, and Handling
A. Refer to Sections 01 65 00 and 01 66 00 for delivery, storage, and handling requirements.
B. Strictly follow Manufacturer’s instructions and warranty requirements for delivery, storage, and handling of manual valve operators.
C. Actuators and valves shall be assembled and factory-tested at valve factory and shipped and delivered to jobsite as a unit.
1.7 Project Site Conditions
A. Refer to Section 01 10 01 for full list of project site conditions.
1.8 Unit Prices
A. Payment for Work in this section shall be included as part of lump-sum or unit-price bid amount for which such Work is appurtenant.
PART 2 - PRODUCTS
2.1 Acceptable Manufacturers
A. Acceptable Manufacturers include:
ITEM MANUFACTURER MANUFACTURER LOCATION
Gear Actuators –
Worm-Gear Type
AUMA USA GS Series Tustin, CA (714) 247-1250
EIM / Emerson Model WB Series Houston, TX (281) 477-2801 Limitorque Div Flowserve Model HBC or PT Series Lynchburg VA (434) 528-8595 Accepted Equal
Valve Boxes and
Covers – Circular Cover
– Iron
Alhambra Foundry Company Ltd. Alhambra, CA (626) 289-4294 Bingham & Taylor Mark V Culpepper, VA (540) 825-8334
Corona, CA 951 280 4588
Long Beach Iron Works, Inc. Long Beach, CA (562) 432-5451 Neenah Foundry Ontario, CA (626) 602-6796
Rich Manufacturing Division Clow Valve Company Div
McWane, Inc “Figure 930”
Corona, CA (951) 735-5555
Reliable Iron Foundry, Inc. Los Angeles, CA (323) 589-3322 South Bay Foundry, Inc. Santee, CA (619) 956-2780
Star Pipe Products Corona, CA (951) 898-0770
Tyler Pipe Div McWane, Inc 6855 Series Tyler, TX (903) 862-5511 U S Foundry and Manufacturing Corp Medley, FL (305) 885-0301 Western Water Works Supply Company Chino Hills, CA (909) 597-7000 Accepted Equal
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 1-22-dp 33 05 39 – Manual Valve Operators - 3 of 7
-
ITEM MANUFACTURER MANUFACTURER LOCATION
Valve Extension Stems
– Solid Steel
Pipeline Products SX San Marcos, CA (760) 744-8907
Troy Valve Division Penn-Troy Manufacturing, Inc. Troy, PA (570) 297-4442 Trumbull Industries, Inc. Youngstown, OH (800) 677-1799 Orange, CA (714) 505-7079
Accepted Equal
Valve Extension Stems
– Stainless Steel
Troy Valve Division Penn-Troy Manufacturing, Inc. Troy, PA (570) 297-4442 Accepted Equal
2.2 Materials
A. Refer to Section 01 61 00 for basic requirements for products and materials.
1. Also refer to sections covering valves to which manual operators are attached.
B. Provide valves complete with operating handwheels, handwheel locking devices, shafting, extension stems, gear actuators, operating nuts, position indicators, and wrenches required for operation.
C.
D. Actuators for valves in exposed service shall contain dial indicating position of valve disc or plug.
E. Valves shall open by turning counterclockwise.
F. Provide lever or wrench actuators for exposed valves ≤3”.
G. Provide traveling nut or worm-gear actuators on butterfly, ball, and plug valves ≥4” as specified below.
H. Provide stop-limiting devices in actuators in open and closed positions.
I. Where operating torque requirements for valve actuators are not stipulated by AWWA standards, valves shall open:
1. with ≤80-pound pull on handwheel when differential pressure across valve equals valve rated pressure class.
2. with ≤150-ft-pound torque input on operating nut when differential pressure across valve equals valve rated pressure class.
J. Provide reduction gearing to meet maximum torque and pull design requirement.
1. Gears shall be oil-lubricated.
2. Provide shaft seal to prevent entry of dirt and water into actuator.
K. Unless otherwise specified, materials for worm-and-gear actuators shall be.
ITEM MATERIAL SPECIFICATION
Gear Housing Same material as valve
body
Totally enclosed, watertight
Exposed Threaded Parts,
Including Cap Screws, Case
Bolts, Carriage Bolts, cover
Screws, Machine Screws, Set
Screws, and Bonnet Bolts
Stainless Steel SAE Type 316
Worm Hardened Alloy Steel Conform to ASTM A148 Grade 105-85 or ASTM A322 Grade 41500
Grind and polish threads
Worm Gears Gear Bronze Conform to ASTM B427
Self-locking 1-piece machine-cut design to prevent
creeping
Thrust Nut Bronze
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 1-22-dp 33 05 39 – Manual Valve Operators - 4 of 7
-
ITEM MATERIAL SPECIFICATION
Exposed Threaded Parts,
Including Cap Screws, Case
Bolts, Carriage Bolts, cover
Screws, Machine Screws, Set
Screws, and Bonnet Bolts
Stainless Steel SAE Type 316
L. Unless otherwise specified, materials for valve boxes shall be H-25 traffic rated and shall be.
ITEM MATERIAL SPECIFICATION
Valve Boxes Cast Iron Conform to ASTM A126 Class B
2-piece sliding type
Valve Box Covers (Circular) Cast Iron Conform to ASTM A126 Class B 8”” diameter tapered solid-skirt
20-lb minimum weight
Coating None / Polyester fusecoat
Color Purple for recycled water
Inscription “WATER”
Valve Stem Extension Pipes Stainless Steel SAE Type 316 Refer to dimensions below
Extension Pipe Stabilizing Plate Steel Two 6½” OD x 3/16” steel plates Weld to valve stem extension with ⅛” weld all-around on both sides.
Weld on 1 plate near top of extension and 1 near bottom.
M. The following product design criteria, options and accessories are required:
ITEM DESCRIPTION
Minimum Rated Working
Pressure
Class 150 (300 WOG psi at 150°F)
Design Differential Pressure Assume differential pressure across plug or disc equals specified rated working pressure of valve.
Fluid Temperature 33°F-120°F
Surface Loading Criteria H-25 (40k axle 20k wheel load) Soil Cover 1’-20’
N. The following product design criteria, options and accessories are required for worm gear operators:
ITEM DESCRIPTION
Worm Gear Helix Angle Design and cut to prevent valve creeping under flow conditions.
Worm Gear Shaft Supports Support worm gear shaft at each end by ball or tapered roller bearings
2.3 Equipment
A. Valves shall close drip tight at rated pressures.
B. Valve operator shall hold valve in any intermediate position between fully open and fully closed without creeping or fluttering
C. Valve operators shall be satisfactory for applications involving valve operation after long periods of inactivity.
D. Unless otherwise shown, install valves in horizontal runs of pipe having centerline elevations ≤4’ 6” above floor with operating stems vertical.
E. Install buried operators with nut ≤48” below grade.
F. Gear actuators shall conform to applicable requirements of AWWA C540.
G. Where possible, actuators shall be self-locking to prevent disc or plug from creeping.
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 1-22-dp 33 05 39 – Manual Valve Operators - 5 of 7
-
H. Unless otherwise specified valves shall be furnished with actuators conforming to the following:
ITEM DESCRIPTION
Buried Valves and Valves
within Manholes or Pipe
Trenches
Valve Can and Cover Provide as shown above except in manholes, vaults, tunnels, or pipe trenches
Actuator 2” AWWA nut / Handwheel /
Handwheels shall include arrow and wording to show
rotation direction to OPEN or CLOSE valve.
Extension Stem
Connector to Actuator
Square socket to fit actuator nut
Extension Stem Required on valves where centerline of valve is >36” / 48” below grade.
Extension stem shall bring nut to within 6” of surface.
Use solid, round or square stock of diameter shown below.
Center extension in valve well with extension pipe stabilizing plate.
Valve size Minimum extension stem diameter
3”- 4”“
6”
8”
10”-12”
14”
16”-18”
20”-36”
42”-54”
⅞”
1”
1⅛”
1¼”
1 ⅜”
1½”
1¾”
2”
Stop-Limiting Devices Provide for open and closed positions.
Devices shall be adjustable without disassembling gear box Enclosure Design for short-term immersion in water and for buried service
Provide watertight shaft seals and watertight valve and actuator cover gaskets
Lubrication Oil-lubricated
Position Indicator Design to fit inside standard 5¼” valve box.
Indicator shall show valve position and direction and number of turns required to fully open or close valve.
Position Transmitter Not required
Actuators on Manual Butterfly,
Ball and Plug Valves 4”-20”
Enclosed traveling-nut type gear actuators / Enclosed worm-and-gear or traveling-nut type gear actuators.
Size actuator per AWWA C504 for bi-directional pressures.
Actuators on Ball and Plug
Valves ≥ 6”
Enclosed worm-and-gear type gear actuators
I. Traveling nut gear actuators shall conform to the following:
ITEM DESCRIPTION
Traveling Nut Gear Actuators Design “Self-locking” conform to AWWA C540 Allowable Input Torque Withstand 450 ft-lbf against stop limiting devices with no damage
J. Worm-gear actuators shall conform to the following:
ITEM DESCRIPTION
Worm Gear Actuators Design “Self-locking” 1-piece design Conform to AWWA C540
Allowable Input Torque –
Handwheel, Chainwheel, Lever,
or Crank Actuators
200 lbf against stop limiting devices with no
damage
Allowable Input Torque –
Operating Nuts
300 ft-lbf against stop limiting devices with no
damage
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 1-22-dp 33 05 39 – Manual Valve Operators - 6 of 7
-
K. Worm-gear actuators for valves <24” shall rotate valve element (disc, plug, or ball) from fully closed to fully open position with number of turns of actuator nut or wheel between 1.5 and 3 x nominal valve diameter.
1. Actuators shall conform to the following requirements for turns to open or close:
WORM GEAR VALVE ACTUATOR SELECTION
Nominal
Valve
Diameter
Specified Range of Turns
4” 6-12
6” 9-18
8” 12-24
10” 15-30
12” 18-36
14” 21-42
16” 24-48
18” 27-54
20” 30-60
L. Worm-gear actuators for valves ≥ 24” shall rotate valve element (disc, plug, or ball) from fully closed to fully open position with number of turns of actuator nut or wheel ≥1.5 x nominal valve diameter and ≤3 x nominal valve diameter.
M. Actuators shall conform to the following requirements for turns to open or close:
150-PSI WORM GEAR VALVE ACTUATOR SELECTION
Nominal
Valve
Diameter
Specified
Range of
Turns
AUMA
Make &
Model
Turns to
Open or
Close
EIM Make
Model
Turns to
Open or
Close
Limitorque
Make &
Model
Turns to
Open or
Close
24” 36-72 GS125.3 13* WB52 64 PTA30/3.5 60
30” 45-90 GS160.3 /
GS160.3 4:1
54.5* WB52 64 PTA65/3.1 47
36” 54-108 GS160.3 /
GS160.3 4:1
54.5* WB54 70 PTA120/6.3 95
42” 63-126 GS200.3 /
GZ200.3 8:1
108.5* WB54 70 PTA120/6.3 95
48” 72-144 GS250.3 /
GZ250.3 8:1
103* WB65 148* PTA250/6 96
54” 81-162 GS250.3 /
GZ250.3 8:
103* WB65 148 PTA250/18 288*
250-PSI WORM GEAR VALVE ACTUATOR SELECTION
Nominal
Valve
Diameter
Specified
Range of
Turns
AUMA
Make &
Model
Turns to
Open or
Close
EIM Make
Model
Turns to
Open or
Close
Limitorque
Make &
Model
Turns to
Open or
Close
24” 36-72 GS125.3 13* WB52 64 PTA30/3.5 60
30” 45-90 GS160.3 /
GS160.3 4:1
54.5* WB52 64 PTA65/3.1 47
36” 54-108 GS160.3 /
GS160.3 4:1
54.5* WB54 70 PTA120/6.3 95
42” 63-126 GS200.3 /
GZ200.3 8:1
108.5* WB65 148* PTA120/6.3 95
48” 72-144 GS250.3 /
GZ250.3 8:1
103* WB65 148* PTA250/6 96
54” 81-162 GS250.3 /
GZ250.3 8:
103* WB74 270* PTA250/18 288*
• Indicates number of turns does not meet requirement and spur-gear reduction is required to correct. • Spur-gear submittal is required.
N. Furnish special tools, wrenches and appliances needed to adjust, operate, maintain or repair valve operators supplied.
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 1-22-dp 33 05 39 – Manual Valve Operators - 7 of 7
-
PART 3 - EXECUTION
3.1 Preparation
A. Install valves and equipment so as to be easy to operate and service.
1. Where geometry of manufactured valves and equipment and field conditions make it difficult or impossible for average workers to operate or service installed valve or piece of equipment, notify City’s Representative of conflict before installing valve or item of equipment.
3.2 Installation
A. Refer to Sections 01 73 00 and 01 73 24 for basic execution and installation requirements.
B. Furnish and install valve operators on valves at locations shown on Plans and Submittals.
C. The following installation standards shall be followed:
1. Applicable OSHA and Cal OSHA regulations.
2. Other applicable building, fire, plumbing, mechanical and electrical code requirements.
3. City of Corona Standard Drawings
a. Standard Drawing 422 for valve box assemblies and stem extensions
4. Manufacturer’s installation and warranty requirements.
D. Refer variances between above documents and Contract Documents to City’s Representative.
E. Install operators and extensions to tolerances recommended by Manufacturer.
1. Unless otherwise shown, install manual valve operators true, plumb, and level using precision gauges and levels
F. Support valve boxes and keep centered during backfill
1. Center of valve box shall be within ½” of valve operating nuts.
2. Valve box shall be plumb to within 5°.
3. Do not use beveled pipe sections at top of valve box extension pipe.
4. Top cut shall be square and machine-made.
5. Where pavement has not been placed, extend valve box extension risers for key valves well above ground to facilitate location for emergency shutoffs.
6. Final valve box elevation shall be flush with pavement.
3.3 Field Quality Control
A. Field testing shall include:
ITEM TEST FOR
TEST STANDARD
(ASTM OR OTHER TEST STANDARD) FREQUENCY
FIRST
TEST PAID
FOR BY
RETESTS
PAID
FOR BY
Valve Boxes Plumb Center of valve box shall be within ½” of valve operating nuts and valve box shall
be plumb to within 5°.
1 inspection City City
Elevation Valve box shall be flush with finished
pavement
1 inspection City City
11-month
Warranty
Inspection
Confirm Work conforms to Contract
Documents and Manufacturer’s printed
literature
1 test City Contractor
3.4 Adjusting and Lubricating
A. Plans do not show valve box cover elevations.
1. Determine and set cover elevations in field so finished rim elevations are flush with finished pavement where directed by City's Representative.
END OF SECTION
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 1-22-dp 33 11 18 – Cement-Mortar Lining and Coating of Steel Pipe - 1 of 9 SECTION 33 11 18
CEMENT-MORTAR LINING AND COATING OF STEEL PIPE
PART 1 - GENERAL
1.1 Work Included
A. Materials, testing, and installation of cement-mortar lined and coated fabricated steel pipe conforming to AWWA C205.
B. Steel pipe sizes shown are nominal inside diameters.
1. Nominal diameter shown shall be inside diameter after lining.
1.2 Related Work
A. Section 01 10 01: Summary of Work and Sequence of Construction B. Section 01 33 00: Submittal Procedures
C. Section 01 40 00: Quality Requirements
D. Section 01 61 00: Common Product Requirements
E. Section 01 65 00: Product Delivery Requirements
F. Section 01 66 00: Product Storage and Handling Requirements G. Section 01 73 00: Execution
H. Section 01 73 33: Mechanical Identification
I. Section 03 30 00: Cast-in-Place Concrete
J. Section 09 90 00: Painting and Coating
1.3 Definitions
A. The following definitions apply:
1. Type A Mortar Coating is defined as wire-fabric-reinforced mortar, mechanically or pneumatically applied to exterior surface of steel pipe and fittings.
2. Mortar Lining is defined as centrifugally spun and pneumatically or mechanically applied mortar on interior of steel pipe and fittings.
3. Pneumatically Applied Mortar is defined as proportioned combinations of Portland cement and aggregate pneumatically transported in dry state through pipe or hoses to nozzles where water is added just prior to discharge, and mixture is propelled to Work. a. Also known as dry-mix process or gunite.
1.4 System Description
A. Furnish and install complete pipe lining and coating system including appurtenant Work required for compliance with Manufacturer’s installation requirements and compliance with applicable building codes and standards.
1.5 Quality Assurance
A. Use adequate numbers of skilled workmen trained and experienced in necessary trades and crafts and completely familiar with specified requirements and methods for proper performance of Work of this section.
B. Mortar application method and type of machinery and equipment shall have been used successfully for similar Work for ≥5 years.
1. Machines used for centrifugal lining shall have been used successfully for similar work and shall have been shown to be capable of handling pipe of size and type specified.
C. Employ supervisor who has ≥2 years’ experience operating same type of equipment on similar work.
D. Complete factory testing of steel pipe prior to lining and coating.
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 1-22-dp 33 11 18 – Cement-Mortar Lining and Coating of Steel Pipe - 2 of 9 E. Factory testing of cement mortar linings and coatings shall include:
ITEM TEST FOR
TEST STANDARD
(ASTM OR OTHER TEST STANDARD) FREQUENCY
FIRST
TEST PAID
FOR BY
RETESTS
PAID FOR
BY
CementMortar
Lining and
Coating
Surface
Preparation
SSPC SP2 or SSPC SP3 Each pipe
section
Contractor Contractor
If City opts for plant inspection, do not apply
coating or lining before City’s
Representative accepts surface
preparation.
Coatings or lining applied without City’s
acceptance will be rejected and shall be
removed and reapplied after City Inspection
Each pipe
section
City City
Finish
Tolerance
24” straightedge laid parallel to pipe axis
along any part of surface shall at no point
have space between lined surface and
straightedge > ⅛”.
After troweling, 9 out of 10 places checked
shall conform to specified tolerance.
Each pipe
section
Contractor Contractor
Curing
Temperature
Install temperature recorders of accepted
type and maintain at curing chambers.
Location of sensing bulbs and recorders
shall be subject to acceptance from City’s
Representative.
Submit 2 copies of charts of recorded
curing chamber temperatures to City’s
Representative following completion of
each curing cycle
Each curing
cycle
Contractor Contractor
CementMortar
Lining
28-day
Strength
AWWA C205 §5.1 Sampling and Testing
Cement Mortar for Linings
Refer to
AWWA C205
§5.1
Contractor Contractor
CementMortar
Coating
Absorption AWWA C205 §5.1 Testing Cement Mortar
for Coatings
Refer to
AWWA C205
§5.2
Contractor Contractor
F. City or City’s Representative shall be entitled to inspect pipes and witness manufacturing process.
1.6 References
A. Reference publications below form part of this specification to extent referenced and are referred to within text by basic designation only.
1. ASTM A82 Steel Wire, Plain, for Concrete Reinforcement
2. ASTM A185 Welded Wire Fabric, Plain, for Concrete Reinforcement
3. ASTM A497 Steel Welded Wire Fabric, Deformed, for Concrete Reinforcement
4. ASTM A615 Deformed and Plain Billet-Steel Bars for Concrete Reinforcement
5. ASTM C33 Concrete Aggregates
6. ASTM C40 Organic Impurities in Fine Aggregates for Concrete
7. ASTM C94 Ready-Mixed Concrete
8. ASTM C109 Compressive Strength of Hydraulic Cement Mortars
9. ASTM C150 Portland Cement
10. ASTM C171 Sheet Materials for Curing Concrete
11. ASTM C289 Potential Alkali-Silica Reactivity of Aggregates (Chemical Method)
12. ASTM C309 Liquid Membrane-Forming Compounds for Curing Concrete
13. ASTM C494 Chemical Admixtures for Concrete
14. ASTM C685 Concrete Made by Volumetric Batching and Continuous Mixing
15. ASTM C1240 Silica Fume for Use as a Mineral Admixture in Hydraulic-Cement Concrete, Mortar, and Grout
16. AWWA C205 Cement-Mortar Protective Lining and Coating for Steel Water Pipe 4” and Larger – Shop Applied
17. AWWA C218 Liquid Coatings for Aboveground Steel Water Pipe and Fittings
18. AWWA C602 Cement-Mortar Lining of Water Pipelines 4” and Larger in Place
19. AWWA C604 Installation of Steel Water Pipe 4” and Larger DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 1-22-dp 33 11 18 – Cement-Mortar Lining and Coating of Steel Pipe - 3 of 9
20. California Test Method 515D Relative Mortar Strength of Portland Cement Concrete Sand
21. Fed Spec SS-P-385 a.
22. NSF/ANSI 61 Drinking Water System Components – Health Effects
23. SSPC SP2 Hand Tool Cleaning
24. SSPC SP3 Power Tool Cleaning
1.7 Submittals
A. Furnish the following submittals.
SUBMITTAL DESCRIPTION
MOBILIZATION SUBMITTALS
Mortar Lining and Coating
Lining Operations QA/QC
Plan
On City’s request, submit QA/QC procedures and methods to line, coat, cure, and protect pipe and fittings ≥15 working days prior to shop coating and lining of pipe and fittings.
These procedures shall include:
1. Mortar coating equipment and procedures
2. Mortar lining equipment and procedures
3. Curing methods and equipment, including type of temperature recorders used and locations of instruments and recorders
4. Equipment for application of curing compound
5. Materials and methods proposed for repair to damaged coating or lining
6. Method and procedure used to ensure thickness and density of mortar lining and coating conforms to specified requirements
7. Description of curing methods used.
8. Bracing plan.
9. Procedures for transporting pipe from plant to job site MANUFACTURER’S LITERATURE
Product Data Submit per Product Data requirements for protective coating Submit source of fine aggregate from each source for acceptance prior to use.
Submit source and Product data on proposed mortar admixtures or additives.
QUALITY ASSURANCE AND CONTROL SUBMITTALS
Certificate of Compliance Submit the following.
1. Mill test reports for reinforcing wire and welded wire fabric used for reinforcing or mortar linings and coatings.
2. Mill test reports for cement and mortar materials.
3. Lining and coating materials certification for each load of cement.
4. Lining and coating application certification for compliance with AWWA C205.
Engineering Calculations
(Mix Design)
Submit for each type of mortar.
Include results of required tests and statement identifying mix ingredients and where each mix will be used in Work
Mix design shall include:
1. Type, brand, source, and amounts of cements, pozzolans, and admixtures
2. Sources and amounts of water and aggregates
3. Representative samples of sand
4. Specific gravity of materials
5. Certificate of compliance for cement and pozzolans.
6. Submit supporting test data upon request.
7. Test results for water
8. Material specifications, instructions for use, and MSDS sheets for solvent used to clean pipe interior before lining.
9. Material specifications, instructions for use, and MSDS sheets for curing compound.
Test Record Transcripts Submit mill reports and plant test reports per Test Record Transcript requirements.
Submit test reports for factory tests of mortar lining and coatings.
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 1-22-dp 33 11 18 – Cement-Mortar Lining and Coating of Steel Pipe - 4 of 9
SUBMITTAL DESCRIPTION
Submit curing records.
CLOSEOUT SUBMITTALS
Warranty Furnish 1-year warranty from date of final acceptance B. Submit data used by Contractor in manufacture and quality control.
C. Refer to Section 01 33 00 for definition of requirements for Shop Drawings, Product Data, Installation Instructions, Certificates of Compliance, and Test Record Transcripts.
1.8 Delivery, Storage, and Handling
A. Refer to Sections 01 65 00 and 01 66 00 for delivery, storage, and handling requirements.
B. Pack, ship, handle, and store pipe in accordance with Manufacturer’s instructions and AWWA C604 and AWWA M11 Chapter 12.
C. Provide pipe bracing on specials, fittings, and straight pipe to prevent damage to pipe and fittings during handling, storage, hauling, and encasement in concrete.
1. At plant, place internal pipe bracing at uncoated pipe ends immediately after completing mortar lining.
2. Bracing shall restrict maximum and minimum diameter deviation to >0.5% from nominal diameter at any point.
3. Where, additional interior braces are required before coating, add braces prior to mortar coating but after lining has received ≥72-hour water cure or 12-hour steam cure.
4. Braces may be temporarily removed when pipe is placed in coating machine
5. To protect mortar coating and maintain diametric tolerances, replace pipe braces and place additional braces in pipe interior immediately after pipe is removed from coating machine.
6. Where braces are placed on lined areas, provide sufficient bearing surface at ends of braces inside pipe so mortar lining is not damaged.
7. Pipe bracing may be reused, provided damaged ends are redressed to provide square and uniform bearing and previously used fasteners are removed.
8. Manufacturer’s recommended vertical and horizontal bracing shall remain in place while pipe is loaded, transported, unloaded at job-site, and encased in concrete.
9. Repair or replace pipe damaged during handling, hauling, storage, or encasement in concrete.
10. Repair locations where bracing has attached to pipe and other coating and lining damage.
D. If Contractor elects to water cure, in no event shall pipe be transported from coating yard before exterior mortar coating has aged 7 days.
E. Transportation shall be by competent haulers and accomplished in manner preventing damage to pipe, lining, or coating.
1. Use blocking and hold-downs during shipment to prevent movement or shifting.
2. Bulkhead or cover both ends of pipe and fittings on trucks or rail cars to prevent excessive drying of interior lining.
3. During transportation, pipe shall rest on saddles ≥36” wide and shaped to outside diameter of coated pipe.
4. Saddles shall contact pipe bottom along arc of ≥60°.
5. Saddles shall be lined with ≥⅝”-thick rubber belting.
6. Belting shall overlap edges of saddles ≥3”.
7. Do not use nails or other fasteners that may damage coated pipe in installing rubber belting on saddles.
8. Do not use chains or wire rope to secure pipe to transporting vehicle.
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 1-22-dp 33 11 18 – Cement-Mortar Lining and Coating of Steel Pipe - 5 of 9 F. Throughout transportation, delivery, handling and installation:
1. Protect pipe linings and coatings from damage.
2. Keep pipe sections closed at ends.
3. If, in opinion of City’s Representative, conditions require lined pipe be protected from sunrays due to extreme solar heat, cool pipe by covering it with wet burlap.
4. When handling pipe, lift pipe sections using belt slings spaced to prevent deformation of pipe section.
5. Should lining be damaged or found not to conform to Contract Documents, remove and replace damaged or unsatisfactory portions of lining.
6. Restore damaged portions of linings and coatings to condition equal to that specified in this section for original Work.
7. Schedule operations so pipe will be installed within 48 hours after discontinuing water curing or application to lining.
8. After pipe and fittings have been installed, keep mortar lining moist until pipeline is filled with water for testing.
1.9 Project Site Conditions
A. Refer to Section 01 10 01 for full list of project site conditions.
PART 2 - PRODUCTS
2.1 Acceptable Manufacturers
A. Acceptable Manufacturers include:
ITEM MANUFACTURER MANUFACTURER LOCATION
CEMENT-MORTAR LINING AND COATING OF STEEL PIPE
Fabricated Steel Pipe and
Fittings
Use same Manufacturer as pipe fabricator or mill
2.2 Materials
A. Refer to Section 01 61 00 for basic requirements for products and materials.
B. 3Materials for pipe lining and coating shall be:
MATERIAL/
COMPONENT
STANDARDS/
CHARACTERISTICS SPECIFICATION/REQUIREMENT
MORTAR MATERIALS
Cement Type Cement – Conform to ASTM C150 Type II/V low-alkali Source Cement shall be procured from 1 mill,
Sand Fine Aggregate – Refer to Section 03 30 00
Refer to gradation table below
Properties Relative mortar strength of fine aggregate shall exceed 90% Evaluate potential reactivity using methods in ASTM C33 Appendix Aggregate shall be innocuous when tested per ASTM C289
Color of supernatant liquid shall not be darker than standard when tested per ASTM C40.
Impurities Sand shall be free from deleterious amounts of dust, clay lumps, shale, soft or flaky particles, mica, loam, oil, and alkali
Quality Quality of sand shall ensure 2” by 4” mortar cylinders, made with cementsand mixture, develop compressive strengths at 7 and 28 days ≥ 90% of those developed by mortar prepared in same manner with same cement and graded Ottawa testing sand, in accordance with Caltrans Test Method 515D
Water Water shall be clean and free from detrimental quantities of organic matter, alkali, salts, and impurities that, in opinion of City’s Representative, might reduce strength, durability, or other quality of mortar.
Impurities Water shall contain ≤650 ppm chlorides
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 1-22-dp 33 11 18 – Cement-Mortar Lining and Coating of Steel Pipe - 6 of 9 Water shall contain ≤1000 ppm sulfates as SO4
Water shall not contain amount of impurities causing change in setting time of Portland cement >25%, nor reduction in compressive strength of mortar at 14 days of >5% when compared to results obtained with distilled water when tested in accordance with ASTM C109 Water for curing shall not contain impurities in sufficient amount to cause discoloration of concrete or mortar or produce etching of surface Source Change in water supply shall be tested by Contractor and accepted by City’s Representative prior to use
Admixtures High-Range WaterReducing Admixtures Conform to ASTM C494 Type E or F Water Reducing
Admixtures
Conform to ASTM C494 Type A or D
Non-Chloride
Accelerators
Conform to ASTM C494 Type C or E
Calcium Chloride or
Added Chloride
Do not use.
Air Entraining Agents Do not use.
Mix Design Exact proportions of each mix shall be determined by Contractor, subject to acceptance by City’s Representative.
City’s Representative may order change in proportions if required to achieve satisfactory results.
Mortar shall be well-mixed and of proper proportions and consistency Measurement of dry material shall be by volume, using accepted method.
Mix design proportions may be converted to weights for use in weigh-batch plant.
Pneumatically-placed
Flash Coating for Hand
Trowelling
1 part cement : 2 parts sand
Mortar for Spun-mortar
Lining
1 part cement : ≤2½ parts
Mortar for Coating
Machines,
Pneumaticallly-Applied
Lining and
Pneumatically-Applied
Coating
1 part cement : ≤3½ parts sand
Water-Cement Ratio Control and minimize water-cement ratio.
Make allowances for moisture collecting on pipe surfaces and for most effective application operation and adhesion of mortar to pipe
CURING MATERIALS
Curing
Materials
Curing Compound White-pigmented
Conform to ASTM C309, Type 2, Class B, wax-resin or all-resin-base compound as modified below.
Loss of water, when tested in accordance with ASTM C309, shall not exceed 0.45 kilogram per square meter in 72 hours.
Curing compound shall conform to current local, state, and federal airquality regulatory requirements.
Curing compound may only be used with mortar coating.
Do not use curing compound on mortar lining.
Polyethylene Film for
Pipe Ends
Conform to ASTM C171
Thickness ≥4 mils
Whitewash Conform to AWWA C203
LININGS AND COATINGS
Lining and
Coating AboveGround Pipe or
Pipe in
Vaults
Cement-Mortar Lining Conform to AWWA C205 and AWWA C602 Hold back lining as necessary to allow full operation of butterfly or check valves at connections to steel pipe
Line exposed portions of pipe interior with hand-applied epoxy per Section 09 96 56.
Cement-Mortar
Coating
Conform to AWWA C205 and AWWA C602
Coating thickness: ≥¾” unless otherwise shown.
Trim coating 6” to 12” above grade on spools penetrating to daylight or DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 1-22-dp 33 11 18 – Cement-Mortar Lining and Coating of Steel Pipe - 7 of 9 vault interiors
Liquid Epoxy Lining Line exposed portions of pipe interior not cement-mortar-lined with liquid epoxy per AWWA C210 and Section 09 96 56.
Liquid Epoxy Coating Conform to AWWA C210.
Refer to Section 09 96 56.
Fusion-Bonded Epoxy
Lining and Coating
Conform to AWWA C213.
Refer to Section 09 96 56.
Extruded Polyolefin
Coatings
Conform to AWWA C215 for Extruded Coatings
Conform to AWWA C216 for Heat-Shrinkable Cross-Linked Coatings Refer to Section 33 11 19.
Lining and
Coating Buried
and Partially
Buried Pipe
Cement-Mortar Lining Conform to AWWA C205 and AWWA C602 Hold back lining as necessary to allow full operation of butterfly or check valves at connections to steel pipe
Line exposed portions of pipe interior with hand-applied epoxy per Section 09 96 56.
Cement-Mortar
Coating
Conform to AWWA C205 and AWWA C602
Coating thickness: ≥¾” unless otherwise shown / ≥1” (corrosive soil areas)
Trim coating 6” to 12” above grade on spools penetrating to daylight or vault interiors.
STEEL REINFORCEMENT
Spiral Wire
Reinforcement
for CementMortar Coatings
Steel Wire Conform to ASTM A82
14 gauge wire minimum
Circumferential
Steel Bar
Reinforcement
Steel Bar Conform to ASTM A615 Grade 40
Circumferential
Steel Wire
Reinforcement
Steel Wire Fabric Conform to ASTM A185 or ASTM A497
W-1.4/W1.4 (10-gauge) wire minimum
Space at 2” on-center longitudinally and 4” on-center parallel to pipe axis Steel Spiral Wire Conform to ASTM A82
12 gauge wire minimum spaced ≤1¼” center-to-center
C. Materials for cement-mortar lined and coated steel pipe fittings shall be:
MATERIAL/
COMPONENT
STANDARDS/
CHARACTERISTICS SPECIFICATION/REQUIREMENT
Fittings and
Specials
Coatings Same coating as adjacent pipe, as described above Linings Same lining as adjacent pipe, as described above D. The following product design criteria, options and accessories are required:
ITEM DESCRIPTION
Cement-Mortar
Lining
Centrifugally cast lining shall be product of 1 company in business of designing and manufacturing cement-mortar lined steel pipe.
Do not use subcontractors or subcontracts to apply lining E. Protect exposed portion of joint rings from corrosion by Manufacturer's standard coating.
F. Fine aggregate gradations shall conform to the following:
PERCENTAGE PASSING SIEVES BY WEIGHT
SIEVE
SIZE
PNEUMATICALLY-APPLIED
MORTAR
SPUN MORTAR LINING FLASH COAT FOR HANDTROWELING
⅜” 100% 100%
#4 90-100% 90-100% 100%
#8 65-100% 75-90% 95-100%
#16 45-75% 55-75% 50-100%
#30 30-50% 30-50%
#50 12-22% 10-25% 20-40%
#100 2-8% 0-10% 7-15%
#200 0-4% 0-5% 0-4%
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 1-22-dp 33 11 18 – Cement-Mortar Lining and Coating of Steel Pipe - 8 of 9 ASTM
C131 Test
Grading
A B C
G. In addition, difference between percentages passing #30 and #50 sieves shall be ≤32%.
H. Deleterious substances in mortar aggregate sand shall not exceed:
SUBSTANCE MAXIMUM % BY WEIGHT
Shale ≤1%
Clay Lumps ≤1%
Mica and other Deleterious Substances ≤2%
Sum of Deleterious Substances ≤3%
I. Cement-mortar lining and coating shall be as follows:
1. For the following nominal inside diameters, standard AWWA C205 lining thickness and minimum cement-mortar coating thickness shall be:
LINING COATING
Nominal Pipe Size
(inches)
Thickness
(inches)
Tolerance
(inches)
Thickness
(inches)
Tolerance
(inches)
6” ¼” -1/16”, +⅛” 1” +⅛
8” ¼” -1/16”, +⅛” 1” +⅛
36” ⅜” -1/16”, +⅛” 1” +⅛
2. Larger diameters shall receive standard-thickness linings per AWWA C205 Table 1 and coatings per AWWA C205 Section 4.5.3.
3. Factory surface preparation, reinforcement, lining, coating, and curing shall conform to AWWA C205.
4. Allow linings and coatings to cure ≥7 days at ≥40°F before shipping pipe to Work site.
5. Apply curing or sealing compounds with care to prevent application of such compound to joint ends where compound will interfere with bond of joint mortar.
6. Hold back lining and coating from socket and spigot ends per Manufacturer’s standard practices.
a. Hold back coating from ends of butt-strap, mechanical coupling, and flanged joint pipe sufficient distance to permit field assembly of joints. b. Terminate lining at pipe ends, except where otherwise specified or where necessary to accommodate free motion of butterfly or check valve discs.
7. To protect surfaces from pitting or rusting, clean non-coated surfaces and apply brush coat of suitable NSF-61-ertified rust preventative material compatible with finish lining and coating materials to be field-applied
8. Cement-mortar lining and coating of pipe joints in field shall conform to AWWA C205 §4.7 and AWWA C602 §4-8.
J. Fabricate special fittings of welded steel sheet or plate, lined and coated with cement-mortar of same type as adjoining pipe and applied as specified for lining and coating of specials in AWWA C205 and as modified herein.
K. Protect exposed portion of joint rings from corrosion by Manufacturer's standard coating.
PART 3 - EXECUTION
3.1 Installation
A. Refer to Sections 01 73 00 and 01 73 33 for basic execution and installation requirements.
B. Line and coat welded joints as follows:
1. Install extruded butyl rubber pipe joint sealant to welded joints. a. Apply sealant per Manufacturer's instructions.
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 1-22-dp 33 11 18 – Cement-Mortar Lining and Coating of Steel Pipe - 9 of 9
2. Coat interior surface of welded pipe with cement mortar. a. Swab out excess mortar.
3.2 Field Quality Control
A. Perform field tests before field-lining pipe, encasing pipe in concrete, burying, or covering pipe.
B. Field testing shall include:
ITEM TEST FOR
TEST STANDARD
(ASTM OR OTHER TEST
STANDARD) FREQUENCY
FIRST
TEST PAID
FOR BY
RETESTS
PAID FOR
BY
Cement
Mortar
Lining and
Coating
Visual
Inspection
Refer to Part 1.4 “Quality
Assurance” of this specification.
All pipe at City’s
discretion
City City
Cement-Mortar
Lining QA/QC
Progress
Inspections
AWWA C602 §5.3 1 inspection of first
500’ installed of all
steel pipe joints and
spools from each
pipe production run
Contractor Contractor
Cement-Mortar
Lining QA/QC
Final Inspection
AWWA C602 §5.3 1 inspection of all
steel pipe joints and
spools
Contractor Contractor
11-month
Warranty
Inspection
Demonstrate compliance to
Contract Documents and
Manufacturer’s printed literature
1 test City Contractor
3.3 Field Repair Methods
A. Repair mortar coating and lining defects as follows:
1. Remove and replace material lacking uniformity, exhibiting segregation, honeycombing, or lamination, or containing dry patches, slugs, voids, or sand pockets.
2. After cutting or abrasive blasting, wet surfaces sufficiently in advance of shooting so while repair material is being applied, surfaces under repair remain moist but not so wet as to prevent adhesion and good bond.
3. Remove mortar to pipe wall in areas where quality is defective, such as sand pockets, voids, oversanded areas, blisters, drummy areas, cracked areas, and thin spots.
4. When removing defective mortar, cut back material to square shoulder. a. Do not feather-edge joints.
5. Do not hand-patch.
6. If defective lining is removed and pneumatically reapplied, mortar lining shall be reinforced.
7. Replace with pneumatically applied mortar to full required thickness.
8. Do not begin scraping or cutting to remove high spots until mortar is stiff enough to withstand pull of cutting device.
3.4 Protection
A. When pipe laying is not in progress, and during noon hour and overnight, close open end of pipe with tight-fitting cap or plug to prevent entrance of foreign matter into pipe.
B. Do not use pipeline to drain water which has infiltrated into trench.
C. Maintain inside of pipe free from foreign materials and in clean and sanitary condition until acceptance by City.
END OF SECTION
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 1-22-dp 33 11 20 – Polyethylene Encasement of Iron Pipe, Fittings, Couplings, and Valves - 1 of 4 SECTION 33 11 20
POLYETHYLENE ENCASEMENT OF IRON PIPE, FITTINGS, COUPLINGS, AND VALVES PART 1 - GENERAL
1.1 Work Included
A. Materials and installation of polyethylene encasement of iron pipe, fittings, couplings, and valves.
B. Conform to Standard Specifications for Public Works Construction (Greenbook) §209-1, §306-
8.2, applicable permits, and requirements herein.
1.2 Related Work
A. Section 01 10 01: Summary of Work and Sequence of Construction B. Section 01 33 00: Submittal Procedures
C. Section 01 40 00: Quality Requirements
D. Section 01 61 00: Common Product Requirements
E. Section 01 65 00: Product Delivery Requirements
F. Section 01 66 00: Product Storage and Handling Requirements G. Section 01 73 00: Execution
H. Section 01 73 33: Mechanical Identification
I. Section 03 30 00: Cast-in-Place Concrete
J. Section 31 23 00: Excavation and Fill
K. Section 33 05 26: Utility Identification
1.3 System Description
A. Furnish and install polyethylene film wrap around iron pipe.
1. Fittings, couplings, and valves in conformance with Manufacturer’s installation requirements and in compliance with applicable construction safety codes and standards.
1.4 References
A. Reference publications below form part of this specification to extent referenced and are referred to within text by basic designation only.
1. ASTM A624 Polyethylene Encasement for Ductile Iron Pipe for Water or Other Liquids
2. AWWA C105/ANSI A21.5 Polyethylene Encasement for Ductile-Iron Pipe Systems
3. AWWA C600 Installation of Ductile-Iron Water Mains and Their Appurtenances
4. AWWA M41 Ductile-Iron Pipe and Fittings
5. NSF/ANSI 61 Drinking Water System Components – Health Effects
6. SSPWC Standard Specifications for Public Works Construction (Greenbook) §209-1 “Ductile Iron Pipe (DIP)”
7. SSPWC Standard Specifications for Public Works Construction (Greenbook) §306-8 “Prefabricated Pressure Pipe”
1.5 Submittals
A. Furnish the following submittals:
SUBMITTAL DESCRIPTION
MANUFACTURER’S LITERATURE
Product Data Submit per Product Data requirements.
Installation
Instructions
Use AWWA C105 and C600 for pipe installation
QUALITY ASSURANCE AND CONTROL SUBMITTALS
Certificate of
Compliance
Deliver with polyethylene encasement affidavit from Manufacturer certifying compliance with requirements of AWWA C105 and Contract Documents
CLOSEOUT SUBMITTALS
Warranty Furnish 1-year warranty from date of final acceptance B. Refer to Section 01 33 00 for definition of requirements for Product Data, Installation Instructions, and Certificates of Compliance.
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 1-22-dp 33 11 20 – Polyethylene Encasement of Iron Pipe, Fittings, Couplings, and Valves - 2 of 4
1.6 Delivery, Storage, and Handling
A. Refer to Sections 01 65 00 and 01 66 00 for delivery, storage, and handling requirements.
1.7 Project Site Conditions
A. Refer to Section 01 10 01 for full list of project site conditions.
PART 2 - MATERIALS
2.1 Acceptable Manufacturers
A. Acceptable Manufacturers include:
ITEM MANUFACTURER MANUFACTURER LOCATION
V-BIO Enhanced
Polyethylene
Encasement
American Cast Iron Pipe Company (ACIPCO) Birmingham, AL (800) 442-2347 Ductile Iron Pipe Research Association (4”-64”) Birmingham, AL (205) 402-8700 Trumbull Industries, Inc. Youngstown, OH (800) 677-1799 McWane Ductile / Pacific States Cast Iron Pipe Co. Provo, UT (801) 373-6910 U.S. Pipe and Foundry Birmingham, AL (866) 347-7473
Accepted equal
Tape for Polyethylene
Encasement
Berry Plastics CPG / Sealforlife “Polyken No 900” Franklin, MA (877) 910-1725 Canusa CPS / Shawcor Wrapid Tape Toronto, ON (416) 743-7111 JM Eagle, Inc., No V-10 Los Angeles, CA (310) 693-8200
Plicoflex Inc No 340 Houston, TX
Polyken / Seal for Life 934 Franklin, KY (508) 918-1714 Protecto Wrap No 200 Denver, CO (303) 778-8537
Scotchwrap (3M), No 50 St Paul, MN (888) 364-3577
Tapecoat Co., 35 CT Evanston, IL (847) 866-8500
Accepted equal
2.2 Materials
A. Refer to Section 01 61 00 for basic requirements for products and materials.
B. Materials for ductile-iron polyethylene PE film wrap for corrosion protection shall be:
MATERIAL/
COMPONENT STANDARDS/ CHARACTERISTICS SPECIFICATION/REQUIREMENT Polyethylene PE Film Wrap for
Corrosion Protection
Standards Conform to AWWA C105/ANSI A21.50
Material Polyethylene plastic tube
Thickness ≥8-mil, double layer on pipe
≥8-mil triple layer on fittings and
appurtenances
Adhesive Tape to connect plastic
film tubes and plastic film wrap at
fittings and appurtenances
Dimensions 2”-wide adhesive tape ≥10-mil thick
Backing Polyethylene or other polyolefin
Adhesive Capable of bonding to polyethylene
and pipeline coatings
Alternate to Plastic Film Wrap for
Corrosion Protection
Finish Coat 15 mils MDFT Koppers Bituplastic No
33 C. Refer to Section 33 05 26 for requirements for identification, identification tape and warning tape for buried ductile iron pipe.
PART 3 - EXECUTION
3.1 Preparation
A. Make field measurements needed to install DIP pressure pipe and fittings before submitting Shop Drawings or ordering.
1. Make minor changes in dimensions and alignments as needed to avoid utilities or structural conflicts.
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 1-22-dp 33 11 20 – Polyethylene Encasement of Iron Pipe, Fittings, Couplings, and Valves - 3 of 4
3.2 Installation
A. Refer to Sections 01 73 00 and 01 73 33 for basic execution and installation requirements.
B. Refer to Section 31 23 00 for open trench requirements.
C. Provide polyethylene film wrap on ductile iron and cast iron pipe, fittings, restraints, couplings and expansion joints, as follows:
1. Conform to requirements of AWWA C105.
2. Wrap bell-spigot interfaces, flanges, restrained joint components, and irregular surfaces with wax tape or moldable sealant before placing polyethylene encasement.
3. Wrap polyethylene film snugly around exterior ferrous surfaces and 8” beyond bells, overlapping at least 2” at each seam.
a. Provide watertight corrosion barrier.
b. Completely encase pipe, and prevent contact between pipe and surrounding soil. c. Prevent soil or bedding material from becoming trapped between pipe and polyethylene wrap.
d. Minimize voids beneath polyethylene.
4. Do not install polyethylene wrap on pipe sections or fittings to be concrete encased, installed within casing or installed through concrete slope anchors.
5. Leave stainless steel nuts and bolts exposed.
6. Secure PE wrap in place using 2” wide plastic tape.
a. At least 3 circumferential turns of polyolefin or polyethylene tape shall seal polyethylene wrap ends over pipe and above valve bonnets with no exposed edges. b. Tape longitudinal seams and longitudinal overlaps, extending tape beyond and beneath circumferential seams.
c. Place circumferential or spiral wraps of tape at 2’ intervals along pipe barrel to minimize space between polyethylene wrap and pipe.
d. Repair cuts, tears, punctures or damage to polyethylene wrap with adhesive tape or with short length of PE tube cut open, wrapped around pipe and secured in place.
7. Overlap adjoining polyethylene tube coatings ≥ 12”, and wrap ends prior to placing concrete anchors, collars, supports, or thrust blocks.
a. Hand-wrap polyethylene sheet, apply 2 wraps with no exposed edges to provide watertight corrosion barrier.
b. Secure in place with polyethylene or polyolefin adhesive tape.
8. 15-mil coat of Koppers Bituplastic No 33 may be applied as alternate to polyethylene wrapping.
D. Provide PE film wrap on ductile iron and cast iron valves as follows:
1. Comply with AWWA C105.
2. Wrap flanges, valves, and irregular surfaces with wax tape or moldable sealant before placing polyethylene encasement.
3. Wrap polyethylene film snugly around valves.
a. Provide watertight corrosion barrier.
b. Completely encase valve, and prevent contact between pipe and surrounding soil. c. Prevent soil or bedding material from becoming trapped between pipe and polyethylene wrap.
d. Press polyethylene wrap tightly into place, leaving no voids underneath and a smooth surface under coating for polyethylene sheet.
e. Minimize voids beneath polyethylene.
4. Wrap valves with flat sheets of polyethylene.
a. Place sheet under valve and flanges or joints with connecting pipe and fold in half.
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 1-22-dp 33 11 20 – Polyethylene Encasement of Iron Pipe, Fittings, Couplings, and Valves - 4 of 4 b. Extend sheet to valve stem and secure sheet in place with polyethylene or polyolefin tape.
c. Apply 2nd layer and secure with tape.
d. Make 2 complete wraps, with no exposed edges.
e. Secure sheets with tape around valve stem below operating nut and around barrel of connecting pipe.
5. Place concrete anchor and thrust blocks after wrap is installed.
E. Repair damaged polyethylene wrap by placing polyethylene sheet over damaged or torn area and securing in place with polyethylene or polyolfin adhesive tape.
F. When connecting polyethylene-encased pipe or fittings to existing pipe, expose existing pipe, clean surface, and securely tape end of polyethylene to existing polyethylene as specified above.
1. When existing pipe is polyethylene encased, wrap new polyethylene encasement over existing with overlap ≥ 24”, and tape as specified above.
G. Backfill by placing sand backfill within 1’ of pipe, valves, and fittings per Section 31 23 00.
H. In addition to polyethylene wrapping ductile iron pipe, wrap service lines of dissimilar metals and attendant corporation stop with polyethylene wrap or suitable dielectric tape for clear distance of ≥3’ from main.
3.3 Field Quality Control
A. Do not backfill joints until City's Representative has observed them.
1. Leave open sufficient trench space in vicinity of each joint to permit visual observation around entire joint periphery.
B. Field testing shall include:
ITEM TEST FOR
TEST STANDARD
(ASTM OR OTHER TEST
STANDARD) FREQUENCY
FIRST
TEST PAID
FOR BY
RETESTS
PAID FOR
BY
Ductile
Iron Pipe
Visual Inspection AWWA C150 All pipe at
City’s
discretion
City City
11-month Warranty
Inspection
Demonstrate compliance to Contract
Documents and Manufacturer’s printed
literature
1 test City Contractor
END OF SECTION
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 1-22-dp 33 12 26 – Air and Vacuum Valves for Water Service – Rolling Seal Design - 1 of 6 SECTION 33 12 26
AIR AND VACUUM VALVES FOR WATER SERVICE – ROLLING SEAL DESIGN PART 1 - GENERAL
1.1 Work Included
A. Materials, testing, and installation of air and vacuum valves for water service, including air release valves, air/vacuum valves, combination air and vacuum valves using rolling seal design as alternate to traditional design described in AWWA C512.
B. Valves specified in this section include:
ITEM SIZE DESCRIPTION
CAV1 1” Combination Air and Vacuum Valve 1
CAV2 2” Combination Air and Vacuum Valve 2
C. Valves shall be equivalent in function to valves described in AWWA C512.
D. Refer to the following sections for Work not covered herein.
E. Refer to the following City of Corona Standard Drawings:
1. City of Corona Standard Drawing 410 for 1” air valve assemblies.
2. City of Corona Standard Drawing 413R for 2” air valve assemblies for recycled water mains.
1.2 Related Work
A. Section 01 10 01: Summary of Work and Sequence of Construction B. Section 01 33 00: Submittal Procedures
C. Section 01 40 00: Quality Requirements
D. Section 01 61 00: Common Product Requirements
E. Section 01 65 00: Product Delivery Requirements
F. Section 01 66 00: Product Storage and Handling Requirements G. Section 01 73 00: Execution
H. Section 01 73 24: Seismic Restraint
I. Section 01 73 33: Mechanical Identification
J. Section 09 90 00: Painting and Coating
K. Section 09 96 56: Epoxy Linings and Coatings
L. Section 33 05 31: Pipeline Joint Materials
1.3 System Description
A. Furnish and install complete operating air and vacuum valve including appurtenant structural and/or mechanical mountings or connections required for compliance with Manufacturer’s installation requirements and compliance with applicable building codes and standards.
B. Air release valves shall automatically release small pockets of air that accumulate at high points in system.
C. Combination air and vacuum valves shall automatically release small pockets of air that accumulate at high points in system and shall allow air to enter or exit pipe to alleviate excess air or vacuum conditions in pipe.
1.4 Quality Assurance
A. Use adequate numbers of skilled workmen trained and experienced in necessary trades and crafts and completely familiar with specified requirements and methods or proper performance of Work of this section.
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 1-22-dp 33 12 26 – Air and Vacuum Valves for Water Service – Rolling Seal Design - 2 of 6 B. Factory testing shall include:
ITEM TEST FOR
TEST STANDARD
(ASTM OR OTHER TEST
STANDARD) FREQUENCY
FIRST
TEST PAID
FOR BY
RETESTS
PAID FOR
BY
Air and
Vacuum
Valves
Hydrostatic Test AWWA C512 §5 “Verification” 1 each valve Contractor Contractor Seat Leakage Test AWWA C512 §5 “Verification” 1 each valve Contractor Contractor Interior
Lining
Holidays and Lining
Thickness
Refer to Section 09 96 56. 1 each ferrous
valve
Contractor Contractor
1.5 References
A. Reference publications below form part of this specification to extent referenced and are referred to within text by basic designation only.
1. ASME/ANSI B1.20.1 (ANSI B2.1) Pipe Threads – NPT National Pipe Thread Taper
2. ASME/ANSI B16.1 Cast Iron Pipe Flanges and Flanged Fittings – Class 25, 125, 150 and 800
3. ASME/ANSI B16.4 Cast Iron Threaded Fittings
4. ASME/ANSI B16.42 Ductile Iron Flanged Fittings – Classes 150 and 300
5. ASTM A47 Ferritic Malleable Iron Castings
6. ASTM A126 Gray Iron Castings for Valves, Flanges and Pipe Fittings
7. ASTM A240 Heat Resisting Chromium and Chromium-Nickel Stainless Steel Plate, Sheet and Strip for Pressure Vessels
8. ASTM A536 Ductile Iron Castings
9. AWWA C213 Fusion-Bonded Epoxy Coating for Interior and Exterior of Steel Water Pipelines
10. AWWA C512 Air Release, Air/Vacuum and Combination Air Valves for Water Service
11. AWWA C514 Air Valve and Vent Inflow Preventer Assemblies for Potable Water Distribution System and Storage Facilities
12. AWWA C550 Protective Epoxy Interior Coatings for Valves and Hydrants
13. NSF/ANSI 61 Drinking Water System Components – Health Effects
1.6 Submittals
A. Furnish the following submittals.
SUBMITTAL DESCRIPTION
DRAWINGS
Shop Drawings Submit for valves ≥6” per valve Shop Drawing requirements.
Submit for lateral supports for valves weighing >30 lbs. .
MANUFACTURER’S LITERATURE
Product Data Submit per Product Data requirements.
Show lining and coating data and thicknesses.
Installation Instructions Submit per Installation Instruction requirements.
QUALITY ASSURANCE AND CONTROL SUBMITTALS
Certificate of Compliance Submit certified test results for leakage and hydrostatic tests Submit certified report of testing of factory-applied linings
CLOSEOUT SUBMITTALS
O & M Instructions Submit per Operation and Maintenance Instruction requirements Warranty In lieu of affidavit of compliance with AWWA C512, furnish 3-year warranty from date of final acceptance
B. Refer to Section 01 33 00 for definition of requirements for Shop Drawings, Product Data, Installation Instructions, O&M Instructions, and Certificates of Compliance.
1.7 Delivery, Storage, and Handling
A. Refer to Sections 01 65 00 and 01 66 00 for delivery, storage, and handling requirements.
B. Strictly follow Manufacturer’s instructions and warranty requirements for delivery, storage, and handling of air and vacuum valves.
1.8 Project Site Conditions
A. Refer to Section 01 10 01 for full list of project site conditions.
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 1-22-dp 33 12 26 – Air and Vacuum Valves for Water Service – Rolling Seal Design - 3 of 6 PART 2 - PRODUCTS
2.1 Acceptable Manufacturers
A. Refer to City of Corona Approved List of Materials for Water Facilities for acceptable Manufacturers for air and vacuum rolling-seal valves.
B. Acceptable Manufacturers for water applications include:
ITEM MANUFACTURER MANUFACTURER LOCATION
Combination Air and
Vacuum Valves
ARI USA, Inc D-060 Series San Diego, CA (714) 505-9319
Orange, CA (714) 505-9319
ARI USA, Inc
D-040-C Series 1”-2”
D-015 Series 3”-8”
San Diego, CA (714) 505-9319
Orange, CA (714) 505-9319
City Standard – No Exceptions
Combination Air and
Vacuum Valves (for
valves 1”-2” and
working pressures <10
psi)
ARI Flow Control Accessories
DT-040 LP Series 1” and 2”
D-050 LP Series 2”
D-060 LP Series 1” and 2” (for high flow)
San Diego, CA (714) 505-9319
Orange, CA (714) 505-7079
City Standard – No exceptions
C. Air release and air and vacuum valves shall be same model as combination air and vacuum valves of same size to allow valves to be interchangeable in field.
2.2 Materials
A. Refer to Section 01 61 00 for basic requirements for products and materials.
B. Materials for combination air and vacuum valves shall be:
ITEM MATERIAL SPECIFICATION
Body and Cover Stainless Steel Conform to ASTM A240 SAE Type 316 Float Polycarbonate
Stainless Steel Conform to ASTM A240 SAE Type 316
EPDM for Recycled
Water
Body Bolts Stainless Steel SAE Type 316
Threaded Ends
Sizes ⅜”-4”
Working Pressures 0-400 psi
Stainless Steel Female-threaded
Conform to ASME/ANSI B1.20.1 (ANSI B2.1)
Flanges
Sizes 1-8”
Working Pressures 0-150 psi
Stainless Steel Conform to AWWA C207 Class D, or ANSI /ASME 16.5 Class 150
Raised- or flat-faced
Flanges
Sizes 1-8”
Working Pressures 150-250 psi
Stainless Steel Conform to AWWA C207 Class E, or ANSI /ASME 16.5 Class 150
Raised- or flat-faced
Valves Boltholes shall straddle horizontal and vertical centerlines of valve.
Flange Alignment Various Stainless Steels Refer to Section 33 05 31.
Flange Bolts, Nuts, and
Washers
Refer to Section 33 05 31.
Flange Gaskets Epoxy Refer to Section 09 96 56.
Conform to AWWA C213 and AWWA C550
8-mil minimum DFT
Do not coat sealing areas and bronze or stainless steel parts.
Epoxy Lining (Iron Surfaces of
Valves < 4”)
Fusion-Bonded Epoxy Refer to Section 09 96 56.
Conform to AWWA C213 and AWWA C550
12-mil minimum DFT
Do not coat sealing areas and bronze or stainless steel parts.
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 1-22-dp 33 12 26 – Air and Vacuum Valves for Water Service – Rolling Seal Design - 4 of 6
ITEM MATERIAL SPECIFICATION
Epoxy Finish Coat Recycled Water Service Purple
C. The following product design criteria, options and accessories are required for combination air and vacuum valves:
ITEM DESCRIPTION
Design Use Manufacturer’s standard design
Design Pressure 150 psi
Valve Outlet Screening Provide mushroom cap covers and bug screens on valve outlets
Tap Location Field tap for valve in level pipe section no closer than 18” to bell, coupling, joint, or fitting.
Only factory outlets will be permitted within 18” of
joint or flange.
PART 3 - EXECUTION
3.1 Preparation
A. Make field measurements needed to install air and vacuum valves before submitting shop drawings or ordering.
1. Make minor changes in dimensions and alignments as needed to avoid utilities or structural conflicts.
B. Field tap for valve shall be made in level pipe section no closer than 18” to bell, coupling, joint, or fitting.
1. Only factory outlets will be permitted within 18” of joint or flange.
2. Do not field-tap or reuse existing taps in asbestos cement pipe.
3.2 Installation
A. Refer to Sections 01 73 00, 01 73 24, and 01 73 33 for basic execution and installation requirements.
B. Furnish and install air and vacuum valves at locations shown on Plans and Submittals.
C. The following installation standards shall be followed:
1. Applicable OSHA and Cal OSHA regulations
2. Applicable fire, plumbing, and mechanical code requirements
3. City of Corona Standard Plans:
a. City of Corona Standard Plan 410 for 1” air valve assemblies. b. City of Corona Standard Plan 413R for 2” air valve assemblies for recycled water mains.
4. Manufacturer’s installation and warranty requirements D. Refer variances between above documents and Contract Documents to City’s Representative.
E. Install air and vacuum valves to tolerances recommended by Manufacturer.
1. Unless otherwise shown, install air and vacuum valves true and level using precision gauges and levels.
F. Install threaded air-vacuum wastewater valves as follows:
1. Clean threaded joints by wire brushing or swabbing.
2. Apply Teflon joint compound or Teflon tape to pipe threads before installing threaded valves.
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 1-22-dp 33 12 26 – Air and Vacuum Valves for Water Service – Rolling Seal Design - 5 of 6
3. If joints leak under pressure testing, remove valve, reapply compound or tape, reinstall, and retest joints.
4. Joints shall be watertight.
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 1-22-dp 33 12 26 – Air and Vacuum Valves for Water Service – Rolling Seal Design - 6 of 6
3.3 Field Quality Control
A. Field testing shall include:
ITEM TEST FOR
TEST STANDARD
(ASTM OR OTHER TEST STANDARD) FREQUENCY
FIRST
TEST PAID
FOR BY
RETESTS
PAID FOR
BY
Air and
Vacuum
Valves
Installation &
Leakage
Visual inspection of finished installation 1 inspection City City Field
Performance
Demonstrate compliance to Contract
Documents and Manufacturer’s printed
literature
1 test Contractor Contractor
Pressure Test Do not test valves at pressures > pressure rating of valve.
If necessary, test and observe valves at 5
psi below rated pressure.
Then close isolation valve beneath air and
vacuum valves during hydrostatic testing
1 test Contractor Contractor
11-month
Warranty
Inspection
Demonstrate compliance to Contract
Documents and Manufacturer’s printed
literature
1 test City Contractor
END OF SECTION
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 2-22-dp 40 23 38 – Chemical Feed Solution Piping, Valves and Appurtenances - 1 of 5 SECTION 40 23 38
CHEMICAL FEED SOLUTION PIPING, VALVES AND APPURTENANCES PART 1 - GENERAL
1.1 Work Included
A. Materials, testing, and installation of sodium hypochlorite and ammonium sulfate piping, valves and appurtenances.
1.2 Related Work
A. Section 01 10 01: Summary of Work and Sequence of Construction B. Section 01 33 00: Submittal Procedures
C. Section 01 40 00: Quality Requirements
D. Section 01 61 00: Common Product Requirements
E. Section 01 65 00: Product Delivery Requirements
F. Section 01 66 00: Product Storage and Handling Requirements G. Section 01 73 00: Execution
H. Section 01 73 24: Seismic Restraint
I. Section 01 73 33: Mechanical Identification
J. Section 09 90 00: Painting and Coating
K. Section 09 96 56: Epoxy Linings and Coatings
L. Section 31 23 00: Excavation and Fill
M. Section 33 05 31: Pipeline Joint Materials
N. Section 33 05 38: Hangers and Supports
O. Section 46 41 17: Inline Static Mixers and Injection Equipment
1.3 System Description
A. Furnish and install complete operating sodium hypochlorite and ammonium sulfate piping, valves and appurtenances including appurtenant structural, mechanical and/or electrical mountings or connections required for compliance with Manufacturer’s installation requirements and compliance with applicable building codes and standards.
B. Piping shall be Hastelloy C-276 with perfluoroalkoxy (PFA) tubing, and chemically compatible with the material being conveyed.
1. Pipe not installed in conduits shall be secured to wall in accordance with California Plumbing Code and Contract Documents.
C. Do not use the following for parts in direct contact with sodium hypochlorite or ammonium sulfate:
1. Bronze, brass aluminum, iron, carbon steel, stainless steel
2. Type 304 or Type 316 stainless steel
3. Nylon, polycarbonate, polyurethane, or Delrin
4. Gum rubber, neoprene, Buna N nitrile, SBR rubber or silanastic.
5. Tungsten carbide seals
1.4 Quality Assurance
A. Use adequate numbers of skilled workmen trained and experienced in necessary trades and crafts and completely familiar with specified requirements and methods for proper performance of Work of this section.
1.5 References
A. Reference publications below form part of this specification to extent referenced and are referred to within text by basic designation only.
1. ANSI B16.1 Cast Iron Pipe Flanges and Flanged Fittings
2. ASTM B619 Welded Nickel and Nickel-Cobalt Alloy Pipe DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 2-22-dp 40 23 38 – Chemical Feed Solution Piping, Valves and Appurtenances - 2 of 5
3. ASTM B622 Seamless Nickel and Nickel-Cobalt Alloy Pipe and Tube
4. ASTM D1785 Poly(Vinyl-Chloride) (PVC) Plastic Pipe, Schedules 40, 80 and 120
5. ASTM D2467 Socket-Type Poly(Vinyl-Chloride) (PVC) Plastic Pipe Fittings Schedule 80
6. ASTM D2683 Socket-Type Polyethylene Fittings for Outside Diameter-Controlled Polyethylene Pipe and Tubing
7. ASTM D2737 Polyethylene (PE) Plastic Tubing
8. ASTM D6867 Perfluoroalkoxy (PFA)- Fluoropolymer Tubing
9. ASTM F437 Threaded Chlorinated Poly(Vinyl-Chloride) (CPVC) Plastic Pipe Fittings, Schedule 80
10. ASTM F438 Socket-Type Chlorinated Poly(Vinyl-Chloride) (CPVC) Plastic Pipe Fittings Schedule 40
11. ASTM F439 Socket-Type Chlorinated Poly(Vinyl-Chloride) (CPVC) Plastic Pipe Fittings Schedule 80
12. ASTM F441 Chlorinated Poly(Vinyl-Chloride) (CPVC) Plastic Pipe Schedules 40 and 80
13. ASTM F442 Chlorinated Poly(Vinyl-Chloride) (CPVC) Plastic Pipe (SDR-PR)
14. ASTM F493 Solvent Cements for Chlorinated Poly(Vinyl-Chloride) (CPVC) Plastic Pipe Fittings
15. ASTM F645 Selection, Design and Installation of Thermoplastic Water Pressure Piping Systems
16. California Electrical Code (CEC)
17. California Fire Code (CFC)
18. California Mechanical Code (CMC)
19. California Plumbing Code (CPC)
1.6 Submittals
A. Furnish the following submittals.
SUBMITTAL DESCRIPTION
DRAWINGS
Shop Drawings Submit per piping Shop Drawing requirements. .
MANUFACTURER’S LITERATURE
Product Data Submit per Product Data requirements.
Clearly show Manufacturer’s designation and model number and materials of construction and ratings of Work furnished.
CLOSEOUT SUBMITTALS
Warranty Furnish 3-year warranty from date of final acceptance except where otherwise noted.
B. Refer to Section 01 33 00 for definition of requirements for Shop Drawings and Product Data.
1.7 Delivery, Storage, and Handling
A. Refer to Sections 01 65 00 and 01 66 00 for delivery, storage, and handling requirements.
B. Strictly follow Manufacturer’s instructions and warranty requirements for delivery, storage, and handling of sodium hypochlorite piping, valves and appurtenances.
1.8 Project Site Conditions
A. Refer to Section 01 10 01 for full list of project site conditions.
PART 2 - PRODUCTS
2.1 Acceptable Manufacturers
A. Acceptable Manufacturers include:
ITEM MANUFACTURER MANUFACTURER LOCATION
Hastelloy C Pipe and
Fittings
Corrosion Materials Bolingbrook, IL (800) 706-7471
High Performance Alloys Tipton, IN (800) 472-5569
Accepted equal
PFA Teflon® Tubing McMaster-Carr Santa Fe Springs, CA (562) 692- 5911
Accepted equal
PVC Plastic Pipe and
Fittings 4””
SpearsManufacturing Company Sylmar, CA (818) 364-1611
City Standard – No Exceptions
Compression-Type
Fitting for PFA Tubing
Swagelok Company San Diego, CA (800) 252-7087
Accepted equal
Hastelloy C Ball Valve Dwyer Instruments Michigan City, IN (219) 879-8000 DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 2-22-dp 40 23 38 – Chemical Feed Solution Piping, Valves and Appurtenances - 3 of 5
2.2 Materials
A. Refer to Section 01 61 00 for basic requirements for products and materials.
B. Wetted parts of sodium hypochlorite piping shall be constructed of materials compatible with sodium hypochlorite.
C. Pipe and fittings outside spill containment area whether buried, exposed or embedded in concrete shall have double wall containments.
D. Piping and appurtenances for sodium hypochlorite and ammonium sulfate services shall be chemically compatible with the following chemicals:
SOLUTION
OR
CHEMICAL
STRENGTH TEMP. FITTING & PIPE
MATERIAL
GASKET,
SEAL,
AND
ELASTO
MER
MATERIA
L
BOLT
MATERIAL
Sodium
Hypochlorite
NaOCl
Solution
9-15% 33°F-100°F Hastelloy C-276 FPM
(Viton)
Stainless Steel
Ammonium
Sulfate
(NH4)2SO4
38% 33°F-100°F Hastelloy C-276 FPM
(Viton)
SAE Type 316
Stainless Steel
E. Materials for sodium hypochlorite and ammonium sulfate piping shall be:
ITEM MATERIAL SPECIFICATION
Sodium
Hypochlorite
Piping
Hastelloy C Pipe Pipe All piping will be Hastelloy C-276 schedule 40. Conform to ASTM B619/ASTM B622.
Joints threaded joints except at valve connections
Provide threaded or flanged adaptors as required for valve connections
Backfill Imported sand to 12” over top of pipe
Native earth above pipe zone
PFA Teflon® Tubing Tube Conform to ASTM D6867-19
Joints Compression union fittings
Wall Thickness 0.063” wall thickness rated for 70 psi at 72°F Conduit Install tubing in Schedule 40 PVC containment pipe with long radius sweeps
Pipe Color and Labeling Refer to Section 01 73 33.
F. Materials for sodium hypochlorite and ammonium sulfate valves shall be:
ITEM MATERIAL SPECIFICATION
Valves Body, end caps, ball and stem Hastelloy C
Trim Hastelloy C
Seat, Body Seals, and stem packing TFM (modified PTFE)
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 2-22-dp 40 23 38 – Chemical Feed Solution Piping, Valves and Appurtenances - 4 of 5 G. Materials for ammonium sulfate piping shall be:
ITEM MATERIAL SPECIFICATION
Ammonium
Sulfate Piping
Hastelloy C Pipe Pipe All piping will be Hastelloy C-276 schedule 40. Conform to ASTM B619/ASTM B622.
Joints Threaded joints except at valve connections
Provide threaded or flanged adaptors as required for valve connections
Backfill Imported sand to 12” over top of pipe
Native earth above pipe zone
PFA Teflon® Tubing Tube Conform to ASTM D6867-19
Joints Compression union fittings
Wall Thickness 0.063” wall thickness rated for 70 psi at 72°F Conduit Install tubing in Schedule 40 PVC containment pipe Pipe Color and
Labeling
Refer to Section 01 73 33.
H. Materials for ammonium sulfate piping appurtenances shall be:
ITEM MATERIAL SPECIFICATION
Valves Body Hastelloy C-276
Gaskets FPM (Viton)
Elastomeric Seats and Seals FPM (Viton)
I. Materials for containment piping shall be:
ITEM MATERIAL SPECIFICATION
Containment
Pipe:
Material PVC
Size 4”
Wall Thickness Schedule 40 (accepted for pressures up to 50 psi in belowground applications) For higher pressures or above-ground pipe, use Schedule 80 Use Schedule 80 for threaded joints
Test Pressure Hydrostatic Test to 75 psi / Air Test to 5 psi J. Materials for containment pipe bends shall be:
ITEM MATERIAL DESCRIPTION
Elbows Material Match containment pipe material and color.
Size 4”
Description 90° long radius and threaded
PART 3 - EXECUTION
3.1 Preparation
A. Make field measurements needed to install sodium hypochlorite and ammonium sulfate piping, valves and appurtenances before submitting Shop Drawings or ordering.
1. Make minor changes in dimensions and alignments as needed to avoid utilities or structural conflicts.
3.2 Installation
A. Refer to Sections 01 73 00, 01 73 24, and 01 73 33 for basic execution and installation requirements.
B. Refer to Section 31 23 00 for open trench requirements.
C. Furnish and install sodium hypochlorite and ammonium sulfate piping, valves and appurtenances at locations shown on Plans and Submittals.
D. The following installation standards shall be followed:
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 2-22-dp 40 23 38 – Chemical Feed Solution Piping, Valves and Appurtenances - 5 of 5
1. Applicable OSHA and Cal OSHA regulations
2. California Mechanical Code Chapter 14 “Process Piping”
3. Other applicable building, fire, plumbing, and electrical code requirements
4. Manufacturer’s installation and warranty requirements E. Refer variances between above documents and Contract Documents to City’s Representative.
F. Install sodium hypochlorite and ammonium sulfate piping, valves and appurtenances as shown on Plans and Submittals.
G. Install sodium hypochlorite and ammonium sulfate piping, valves and appurtenances to tolerances recommended by Manufacturer.
1. Unless otherwise shown, install piping, valves and appurtenances true, plumb, and level using precision gauges and levels.
H. Do not solvent weld joints when ambient temperatures are < 40°F or > 90°F unless solvents specifically formulated for these conditions are used.
I. Construct piping, conduits and tubing as shown except for adjustments to avoid interference with structural features.
1. Coordinate piping and conduits with electrical installation.
J. Provide screw union-type takedown couplings as shown.
1. Provide unions within 3’ of wall penetrations.
K. Provide anchor brackets, guides, saddles or hangers as shown on Plans, required by plumbing codes and as needed to support piping.
1. Provide ≥1 support on each run at each change of direction.
2. Pipe supports shall be either fiber-reinforced plastic or same material as piping or bolting material.
L. Clean piping systems of foreign materials following completion of testing and prior to connection to operating equipment, or control and regulating instrumentation.
1. After cleaning, flush piping systems with clean water for ≥15 minutes.
2. Contractor may, to facilitate cleaning of sections of buried or exposed piping between isolation valves, pressure test and clean system prior to connection to valving. a. Use of this procedure shall not waive requirement for full pressure test of completed system.
3.3 Field Quality Control
A. Field testing shall include:
ITEM TEST FOR
TEST STANDARD
(ASTM OR OTHER TEST STANDARD) FREQUENCY
FIRST
TEST PAID
FOR BY
RETESTS
PAID
FOR BY
Piping
System
Installation &
Leakage
Visual inspection of finished installation 1 inspection City City Field
Performance
Demonstrate compliance to Contract
Documents and Manufacturer’s printed
literature
1 test Contractor Contractor
11-month
Warranty
Inspection
Demonstrate compliance to Contract
Documents and Manufacturer’s printed
literature
1 test City Contractor
END OF SECTION
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 1-22-dp 40 71 13 – Magnetic Flow Meters - 1 of 6
SECTION 40 71 13
MAGNETIC FLOW METERS
PART 1 - GENERAL
1.1 Work Included
A. Materials, testing, and installation of magnetic flow meters 3”-36”.
B. Furnish and install the following magnetic flow meters:
TAG METER
SIZE
(IN)
TRANSMITTER
LOCATION
MODEL
NUMBER
NEMA RATING
(BODY /
TRANSMITTER)
FIT00136” Local Endress +
Hauser
5W43B9H
DN900
7/4X
1.2 Related Work
A. Section 01 10 01: Summary of Work and Sequence of Construction B. Section 01 33 00: Submittal Procedures
C. Section 01 40 00: Quality Requirements
D. Section 01 61 00: Common Product Requirements
E. Section 01 65 00: Product Delivery Requirements
F. Section 01 66 00: Product Storage and Handling Requirements G. Section 01 73 00: Execution
H. Section 09 90 00: Painting and Coating
I. Section 09 96 56: Epoxy Linings and Coatings
J. Section 26 05 10: Common Work Results for Electrical K. Section 33 05 16: Precast Concrete Utility Structures L. Section 33 05 31: Pipeline Joint Materials
1.3 System Description
A. Electromagnetic-type factory-calibrated flow instruments using Faraday’s law of induction to measure flow volume computed based on pipe’s diameter (i.e., Flowrate proportional to induced voltage).
1. Factory-calibrated transmitter.
B. Flow meters shall measure and transmit flow data for process record keeping, variable monitoring, and control.
C. Furnish and install complete operating flow meter including appurtenant structural, mechanical and/or electrical mountings or connections required for compliance with Manufacturer’s installation requirements and compliance with applicable building, plumbing, and electrical codes and standards.
D. Flow meter instrument output variables shall include:
ITEM VARIABLE DESCRIPTION
Output Signals (Analog) Rate of flow 4-20mA signal
1.4 Quality Assurance
A. Factory testing shall include:
ITEM TEST FOR
TEST STANDARD
(ASTM OR OTHER TEST
STANDARD) FREQUENCY
FIRST
TEST PAID
FOR BY
RETESTS
PAID FOR
BY
Flow Meter Wet Calibration Hydraulic Institute Standards 1 each meter Contractor Contractor DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 1-22-dp 40 71 13 – Magnetic Flow Meters - 2 of 6
ITEM TEST FOR
TEST STANDARD
(ASTM OR OTHER TEST
STANDARD) FREQUENCY
FIRST
TEST PAID
FOR BY
RETESTS
PAID FOR
BY
Interior Lining Holidays and
Lining Thickness
Refer to Section 09 96 56. 1 each meter Contractor Contractor Meter Accuracy of Flow
Measurement
AWWA M6 as directed Contractor Contractor
1.5 References
A. Reference publications below form part of this specification to extent referenced and are referred to within text by basic designation only.
1. ASME/ANSI B16.5 Steel Pipe Flanges and Flanged Fittings (Including ratings for Class 150, 300, 400, 600, 900, 1500, and 2500)
2. AWWA C207 Steel Pipe Flanges for Waterworks Service
3. AWWA C222 Polyurethane Coatings and Linings for Steel Water Pipe and Fittings
4. AWWA C550 Protective Interior Coatings for Valves and Hydrants
5. AWWA C751 Magnetic Inductive Flowmeters
6. AWWA M6 Water Meters – Selection, Installation, Testing and Maintenance
7. NEMA/ANSI 250 Enclosures for Electrical Equipment
8. NFPA 70 National Electric Code
1.6 Submittals
A. Furnish the following submittals.
SUBMITTAL DESCRIPTION
DRAWINGS
Shop Drawings Submit per pipeline equipment Shop Drawing requirements .
Submit for transducers under electrically controlled equipment Shop Drawing requirements
MANUFACTURER’S LITERATURE
Product Data Submit the following for items of standard manufacture:
Product name or identification in sufficient detail to facilitate reordering.
List of parts and construction materials referenced by ANSI, NEMA, ASTM, SAE or CDA specification and grade.
Dimensions, laying lengths, and weights.
Standard test reports for mass-produced equipment.
Lining and coating data and thicknesses.
Installation Instructions Submit per Installation Instruction requirements
QUALITY ASSURANCE AND CONTROL SUBMITTALS
Certificate of Compliance Submit certificate of factory testing and calibration for accuracy and capacity.
Test Record Transcripts Submit for factory tests per Test Record Transcript requirements.
CLOSEOUT SUBMITTALS
O & M Instructions Submit per Operation and Maintenance Instruction requirements Warranty Furnish 1-year warranty from date of final acceptance B. Refer to Section 01 33 00 for requirements for Shop Drawings, Product Data, Installation Instructions, O&M Instructions, Certificates of Compliance, and Test Record Transcripts.
1.7 Delivery, Storage, and Handling
A. Refer to Sections 01 65 00 and 01 66 00 for delivery, storage, and handling requirements.
B. Strictly follow Manufacturer’s instructions and warranty requirements for delivery, storage and handling of magnetic flow meters.
1.8 Project Site Conditions
A. Refer to Section 01 10 01 for full list of project site conditions.
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 1-22-dp 40 71 13 – Magnetic Flow Meters - 3 of 6
PART 2 - PRODUCTS
2.1 Acceptable Manufacturers
A. Refer to City of Corona List of Sole-Source Equipment for Water Facilities for acceptable Manufacturers for magnetic flow meters.
B. Acceptable Manufacturers for in-plant magnetic flow meters include:
ITEM MANUFACTURER MANUFACTURER LOCATION
Magnetic Flow
Meters
Endress + Hauser, Inc. Promag W300 Greenwood, IN (714) 674-9520 City Standard - No Exceptions
Features Option Manufacturer’s Code
Basic Model Promag W300 W300
Diameter 36” 5W3B9H DN900
NEC Article 505 Classification Non-Hazardous Areas AA
Design Fixed Flange zero x diameter
inlet/outlet runs
J and K
Power Supply 100-240VAC / 24VAC/DC L
4-20mA
Housing Compact Polycarbonate
Housing
M
Cable, Remote Version 0
Electrical Connection Plug M12x1 + threaded NPT½”
adapter for Ethernet IP
Connection
L
Liner Epoxy
Class 150 Carbon Stainless
Steel Flange ASME B16.5
A1S
Electrodes Flush-Mounted 1.4435/316L
(Use for sewage and gritty
water applications)
0 Calibration Flow 0.2% B
Operation Language Display English AA
Application Package Heartbeat Verification +
Monitoring
EB
Additional Approval NSF 61 Drinking Water
Approval
L4
Firmware Version 01.00zz EtherNet/IP 77
Marking 1xTAG-stainless steel label Z1
C. Flow indicators, totalizers, and transmitters, where shown shall be manufactured by same Manufacturer as flow sensing equipment and shall be fully compatible with equipment furnished.
2.2 Materials
A. Refer to Section 01 61 00 for basic requirements for products and materials.
PART 3 - EXECUTION
3.1 Preparation
A. Make field measurements needed to install magnetic flow meters before submitting shop drawings or ordering.
1. Make minor changes in dimensions and alignments as needed to avoid utilities or structural conflicts.
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 1-22-dp 40 71 13 – Magnetic Flow Meters - 4 of 6
3.2 Installation
A. Refer to Section 01 73 00 for basic execution and installation requirements.
B. Furnish and install flowmeters at locations shown on Plans and Submittals.
C. The following installation standards shall be followed:
1. Applicable OSHA and Cal OSHA regulations
2. Applicable building, fire, plumbing and electrical code requirements
3. AWWA C715 Cold-Water Meters – Electromagnetic and Ultrasonic Type for Revenue Applications
4. AWWA C751 Magnetic Inductive Flowmeters
5. Manufacturer’s installation and warranty requirements D. Refer variances between above documents and Contract Documents to City’s Representative.
E. Install magnetic meter with electrodes located at ends of a horizontal diameter (9 o’clock and 3 o’clock positions) to ensure continued electrode immersion when air bubbles are present in metered fluid.
F. Provide sun shield over transmitters exposed to direct sunlight.
G. Electrically isolate meter from adjacent piping and fittings to prevent stray-current interference.
H. On meters ≥ 3”, provide 1” outlet or service saddle and corporation stop on spool at least 2 pipe diameters downstream from meter.
1. Coordinate location of tap with City’s Representative.
I. Construct grounding rod, and ground magnetic meter in conformance with Manufacturer’s installation instructions.
J. Finished installation shall be compatible with City’s existing flow measurement and telemetry facilities.
3.3 Field Quality Control
A. Field testing will include:
ITEM TEST FOR
TEST STANDARD
(ASTM OR OTHER TEST STANDARD) FREQUENCY
FIRST
TEST PAID
FOR BY
RETESTS
PAID FOR
BY
Magnetic
Meter
Installation &
Leakage
Visual inspection of finished installation 1 inspection City City Accuracy City reserves right to either test meter in
shop before placing meter in service or test
in field using test tap to be furnished by
Contractor.
As directed City Contractor
Field
Performance
Demonstrate Work conforms to Contract
Documents and Manufacturer’s printed
literature
1 test Contractor Contractor
Integration
with City’s
Telemetry
Confirm successful operation with telemetry. As directed Contractor Contractor 11-month
Warranty
Inspection
Confirm accuracy of registration and
compatibility with telemetry.
Confirm Work conforms to Contract
Documents and Manufacturer’s printed
literature
As directed City Contractor
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 1-22-dp 40 71 13 – Magnetic Flow Meters - 5 of 6
3.4 Adjusting and Cleaning
A. Provide services of Manufacturer’s representative as needed for startup, inspection and necessary adjustments as needed to integrate new flowmeter into existing telemetry network.
END OF SECTION
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 3-22-dp 43 23 13 – Horizontal Centrifugal Frame Mounted End Suction- 1 of 14 SECTION 43 23 13
HORIZONTAL CENTRIFUGAL FRAME MOUNTED END-SUCTION PUMPS
PART 1 - GENERAL
1.1 Work Included
A. Materials, testing, and installation of horizontal centrifugal frame-mounted, end-suction water pumps.
B. Pumps shall rotate counterclockwise when viewed from driver end.
C. Pumps specified in this section include:
ITEM HORSEPOWER DESCRIPTION
P1 3 hp Flash Mixer Pump 1
D. Refer to the following sections for Work not covered herein.
1. Section 05 50 00 for requirements for anchor bolts.
2. Section 09 90 00 for requirements for painting requirements.
3. Section 09 96 56 for requirements for epoxy lining and coating.
4. Section 26 05 10 and subsequent sections for electrical requirements.
5. Section 33 05 31 for requirements for flange bolting materials.
6. Section 40 90 10 and subsequent sections for instrumentation and control requirements.
1.2 Related Work
A. Section 01 10 01: Summary of Work and Sequence of Construction B. Section 01 10 02: Sequence of Operation
C. Section 01 33 00: Submittal Procedures
D. Section 01 40 00: Quality Requirements
E. Section 01 61 00: Common Product Requirements
F. Section 01 63 00: Product Substitution Procedures
G. Section 01 65 00: Product Delivery Requirements
H. Section 01 66 00: Product Storage and Handling Requirements I. Section 01 73 00: Execution
J. Section 01 73 24: Seismic Restraint
K. Section 01 75 00: Starting and Adjusting
L. Section 01 79 00: Demonstration and Training
M. Section 05 05 19: Post-Installed Concrete Anchors
N. Section 05 50 00: Metal Fabrications
O. Section 09 90 00: Painting and Coating
P. Section 09 96 56: Epoxy Linings and Coatings
Q. Section 33 05 31: Pipeline Joint Materials
R. Section 40 90 10: Common Work Results for Instrumentation and Control
1.3 Definitions
A. The following definitions apply:
1. Total Dynamic Head: Sum of velocity head plus vertical static head measured from minimum suction water level or minimum suction pressure hydraulic elevation to centerline of pump discharge.
1.4 System Description
A. Furnish and install complete operating pumping system including pumps, motors and necessary appurtenances required by Contract Documents.
1. Pumping units shall be supplied by 1 Manufacturer and shall be complete, including pumps, motors, baseplates, couplings, guards and accessories specified herein.
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 3-22-dp 43 23 13 – Horizontal Centrifugal Frame Mounted End Suction- 2 of 14
2. Furnish and install anchor bolts and appurtenant structural, mechanical and/or electrical mountings or connections required for compliance with Manufacturer’s installation requirements and compliance with applicable building codes and standards.
B. Pumps, motors, drives, couplings and base plates shall be designed and built for 24-hour continuous service at points within specified range of operation, without overheating, damaging cavitation, or excessive vibration or noise.
C. Refer to Section 01 10 02 for Sequence of Operation.
1.5 Quality Assurance
A. Pumps furnished shall originate from ISO 9001-certified facility.
B. Castings shall be free of blow holes, sand holes, and other detrimental effects, and shall be accurately machined.
C. Rotating parts including impellers shall be statically and dynamically balanced.
D. Pumps shall be engineered and manufactured under written Quality Assurance program, which has been in effect for ≥10 years.
1. Quality assurance program shall include documentation of periodic internal and external audits to confirm compliance with such program.
E. Entire pump, including volute or casing, base plate, coupling, shaft, impellers, and specified appurtenances shall be furnished by 1 pump Manufacturer.
F. Factory testing shall include:
ITEM TEST FOR
TEST STANDARD
(ASTM OR OTHER TEST
STANDARD) FREQUENCY
FIRST
TEST PAID
FOR BY
RETESTS
PAID FOR
BY
Test
Instrument
Accuracy
Calibration Calibrate Venturimeters per
ANSI/HI Standards
Calibrate test instruments and
gauges
within 30 days of
scheduled tests.
Contractor Contractor
Pump and
Motor
Assembly
Compliance with
Purchase Order
Verify impeller, motor rating and
electrical connections conform to
Contract Documents
1 each pump
assembly
Contractor Contractor
Holidays and
Lining Thickness
Refer to Section 09 96 56. 1 each pump Contractor Contractor Dynamic Balance NEMA Method MGI 12.06 (8W/N
for pumps)
1 each pump
assembly
Contractor Contractor
Factory Test and
Factory-Certified
Pump Curve
Witnessed running test conforming
to AWWA E103 and ANSI/HI 14.6
6-point curves shall include shutoff
and 3 points as near as possible to
specified performance points.
Performance test to follow HI 14.6
Test Tolerance as standard by the
acceptable pump manufacturer.
Follow 2.1.G if an alternative pump
manufacturer is proposed.
1 each pump
assembly ≥50hp
30-minute test to
prepare 6-point
curves for each
pump assembly.
On variable
speed pumps,
test each pump
and prepare 6-
point curves at
four 100 rpm
increments.
Contractor
(Includes
lodging and
travel
expenses
for up to 3
personnel
from City’s
and/or
Design
Engineer’s
offices.)
Contractor
(Includes
lodging
and travel
expenses
for up to 3
personnel
from City’s
and/or
Design
Engineer’s
offices.)
Vibration As needed to satisfy pump
Manufacturer pumps will pass field
tests described in Part 3 below.
Pump Hydrostatic Casing
Test
Test heads per HI standards to 1.5
x design head or 1.25 x shutoff
head, whichever is greater
1 ten-minute test
each pump
casing
Contractor Contractor
3-Phase
Motors
Prototype Test NEMA MG1 §12.53a and IEEE 112
Test Method B
1 each type of
motor furnished
≥5hp
Contractor Contractor
Short Commercial
Test Data
NEMA MG1 §12.51 and NEMA
MG1 §23.46
1 each motor
≥5hp
Contractor Contractor
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 3-22-dp 43 23 13 – Horizontal Centrifugal Frame Mounted End Suction- 3 of 14
ITEM TEST FOR
TEST STANDARD
(ASTM OR OTHER TEST
STANDARD) FREQUENCY
FIRST
TEST PAID
FOR BY
RETESTS
PAID FOR
BY
including no load running current,
current balance, full load current,
locked rotor current, winding
resistance, high potential test,
bearing inspection, and vibration
test
Insulation 168-hour test in humidity chamber
at 40°C and 100% relative
humidity
1 each motor
≥10hp
Contractor Contractor
Motor Noise IEEE 85 with motor operating
during test on rubber at no load
with rated voltage and frequency
1 each motor
≥10hp
Contractor Contractor
Motor Vibration Conform to NEMA MG1§20.52
maximum amplitudes.
Test per NEMA MG1§12.06 and
NEMA MG1 §20.53
1 each motor
≥10hp
Contractor Contractor
Dynamic Balance Balance and measure per NEMA
MG1 §12,06 or MG1 §20.52 with
maximum amplitudes shown in
NEMA MG1 §12.05
1 each motor
≥10hp
Contractor Contractor
G. paid for by Contractor.
1. Witnessing engineer may be employee of Manufacturer and shall sign and seal copies of curves and test reports and certify tests were performed.
2. Refer to Section 01 40 00 for provisions allowing City to witness factory tests at their expense.
H. Perform testing after final connection of pump and motor and after completion of static and dynamic balancing.
1. If vibration levels fall outside of acceptable limits established by Hydraulic Institute or above, shut down pump and correct for vibration before further testing.
1.6 References
A. Reference publications below form part of this specification to extent referenced and are referred to within text by basic designation only.
1. ANSI/AFBMA 9 Load Ratings and Fatigue Life for Ball Bearings
2. ANSI/AFBMA 11 Load Rating and Fatigue Life for Roller Bearings
3. ANSI B16.1 Cast Iron Pipe Flanges and Flanged Fittings-Class 25, 125, 250 and 800
4. ANSI C50.41 Polyphase Induction Motors for Power Generating Stations
5. ANSI HI14.6 Rotodynamic Pumps for Hydraulic Performance Acceptance Tests
6. ASTM A36 Carbon Structural Steel
7. ASTM A48 Gray Iron Castings
8. ASTM A276 Stainless and Heat Resisting Steel Bars and Shapes
9. ASTM B505 Copper Base Alloy Continuous Castings
10. ASTM B584 Copper Alloy Sand Castings for General Applications
11. AWWA C213 Fusion-Bonded Epoxy Coating for Interior and Exterior of Steel Water Pipelines
12. AWWA C550 Protective Epoxy Interior Coatings for Valves and Hydrants
13. AWWA E103 Horizontal and Vertical Lineshaft Pumps
14. California Building Code (CBC)
15. California Code of Regulations Title 8 Industrial Relations, Subchapter 5, Electrical Safety Orders
16. California Electrical Code (CEC)
17. Hydraulic Institute Standard for Centrifugal, Rotary and Reciprocating Pumps.
18. IEEE 43 Testing Insulation Resistance of Rotating Machinery
19. IEEE 85 Airborne Sound Measurements on Rotating Electric Machinery
20. IEEE 112 Test Procedure for Polyphase Induction Motors and Generators
21. IEEE 115 Test Procedure for Synchronous Machines
22. IEEE 841 Chemical Industry Severe-Duty Squirrel Cage Induction Motors 600V and Below DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 3-22-dp 43 23 13 – Horizontal Centrifugal Frame Mounted End Suction- 4 of 14
23. ISO 9001 Quality Management Standard
24. NEMA/ANSI 250 Enclosures for Electrical Equipment
25. NEMA MG1 Motors and Generators.
26. NEMA MG2 Safety Standard for Construction and Guide for Selection, Installation, and Use of Electric Motors and Generators
27. NEMA MG10 Energy Management Guide for Selection and Use of Polyphase Motors
28. NEMA MG13 Frame Assignments for Alternating Current Integral Horsepower Induction Motors
29. NEMA Standards
30. NFPA 70 National Electric Code (NEC)
31. NSF/ANSI 60 Drinking Water Treatment Chemicals – Health Effects
32. NSF/ANSI 61 Drinking Water System Components – Health Effects
33. UL547 Thermal Protectors for Electric Motors
1.7 Submittals
A. Furnish the following submittals.
SUBMITTAL DESCRIPTION
DRAWINGS
Shop Drawings Pump and Motor Assembly: Show certified dimensions, weights, and materials for volute, impellers, drive assemblies, shafts, bearings, seals, and shaft guards per equipment Shop Drawing requirements.
Show outline dimensions and assembly, foundation and installation requirements.
Show ASTM reference and grade for materials.
.
Motor Wiring and Control: Show wiring and motor controls per electrically controlled equipment Shop Drawing requirements.
Anchor Bolts: Show placement, embedment, and edge distances as required by CBC Chapter 19.
Show embedment distances and projections from concrete face.
Lining and Coating: Show lining and coating data and thicknesses.
MANUFACTURER’S LITERATURE
Product Data Pretest Pump Curves: Show flowrate, TDH, efficiencies, horsepowers, and NPSHR for full range of operating points.
Mark specified operating points.
Show shutoff head.
Other Data: Show moment of inertia of complete pump assembly, coupling data, seal data, bearing life calculations, pressure limitations, and specific speed.
Submit data or accessory items.
Motor Data Refer to motor data requirements of Section 26 05 10.
Installation
Instructions
Submit per Installation Instruction requirements
QUALITY ASSURANCE AND CONTROL SUBMITTALS
Certificate of
Compliance
Submit pump system certification per Certificate of Compliance requirements of AWWA E103 and specifications.
Submit evidence of ISO 9001 factory certification
Submit coating system certification per Certificate of Compliance requirements Submit Installation Certificate signed by equipment Manufacturer's factory-authorized representative stating equipment has been properly installed, shaft aligned and is ready for start-up and performance testing
Submit acknowledgement letter from pump Manufacturer that pump and motor being furnished are compatible for use with variable frequency drive.
Engineering
Calculations
Pump Seismic Restraint: Refer to Section 01 73 24 for requirements Horsepower Requirements: Submit for full range of operation.
Include shaft friction and thrust bearing losses.
Testing Procedures Submit written test procedures in advance of field pump tests.
CLOSEOUT SUBMITTALS
O & M Instructions Submit per Operation and Maintenance Instruction requirements Include parts list and list or recommended spare parts.
Include preventative maintenance schedules
Include troubleshooting data
Include certified performance data and curves from factory tests in O&M manual.
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 3-22-dp 43 23 13 – Horizontal Centrifugal Frame Mounted End Suction- 5 of 14
SUBMITTAL DESCRIPTION
Warranty Furnish 3-year warranty from date of final acceptance for pumps and motors.
Warranty shall bear appropriate serial numbers.
B. Refer to Section 01 33 00 for definition of requirements for Shop Drawings, Product Data, Installation Instructions, O&M Instructions, Certificates of Compliance, Engineering Calculations, and Test Record Transcripts.
1.8 Delivery, Storage, and Handling
A. Refer to Sections 01 65 00 and 01 66 00 for delivery, storage, and handling requirements.
B. Do not ship pumps until City has accepted test reports.
C. Strictly follow Manufacturer’s instructions and warranty requirements for delivery, storage, and handling of horizontal centrifugal split-case pumps.
D. Deliver anchor bolts and anchorage devices to be embedded into cast-in-place concrete in ample time to ensure Work is not delayed.
E. Cover pump equipment as required to guard against entry of deleterious matter, and to protect Work from abrasion.
1.9 Project Site Conditions
A. Refer to Section 01 10 01 for full list of project site conditions.
PART 2 - PRODUCTS
2.1 Acceptable Manufacturers
A. Acceptable Manufacturers include:
ITEM MANUFACTURER MANUFACTURER LOCATION
PUMPS
Peerless 2005 MLK St. Indianapolis, In
(317)925-9661
Flowserve Corporation Hastings, NB (800) 728-7867
Tustin, CA (714) 505-9700
Goulds / Xylem Lubbock, TX (806) 763-7867
Irvine, CA (949) 680-4800
Accepted equal
ACCESSORIES
Pump Shaft Couplings Dodge Para-Flex / Baldor / ABB Fort Smith, AR (479) 646-4711 Accepted equal
Mechanical Seals A W Chesterton Co Seal 155 Groveland, MA (844) 484-7080 Borg Warner Type U
Garlock Sealing Technologies Palmyra, NY (315) 597-4811 John Crane Inc Type 21 Cerritos, CA (562) 802-2555
Accepted equal
Motors General Electric Fairfield, CT (800) 626-2000
US Electrical Motors / Nidec St Louis, MO (888) 637-7333 Accepted equal
Lubricants (Motor) Chevron-Texaco GST ISO VG32 San Ramon, CA (925) 842-1000 Exxon-Mobil DTE Light ISO VG32 Irving, TX (800) 243-9966 Accepted equal
ANALYIS AND TESTING
Vibration Testing Electrical Specialty Products (909) 737-8827 Allis USA (949) 661-3324
Accepted equal Class II vibration analyst certified by
Vibration Institute of America
B. Pump Manufacturer shall have ≥5years’ recent continuous product history in USA waterworks industry.
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 3-22-dp 43 23 13 – Horizontal Centrifugal Frame Mounted End Suction- 6 of 14 C. Pumps furnished shall be capable of operating throughout their full submitted pump curve driven by motors of horsepowers specified below or shown on Plans. The pump’s nonoverloading horsepower may not be greater than the rated horsepower of the motor(s) to be supplied.
D. Pumps requiring larger motor than specified or shown are unacceptable in absence of written statement from City electrical infrastructure, drives and switchgear can support larger motor.
E. Pump curve shall continuously rise from minimum head to shutoff with no intermediate dips.
F. Specified pump and pump curve have been selected based on the reference pump noted in Paragraph 2.2 to provide City with optimum performance at multiple operating points, and not solely at best efficiency point.
G. Contractor may substitute other pumps including pumps from accepted equal manufacturers, provided the following conditions are met:
1. Provisions of HI14.6 limiting pump performance testing to 1 “guarantee point” shall not apply to pumps furnished on this project.
2. Testing shall demonstrate performance at “Point B Best Efficiency Point (BEP) conforms to Acceptance Level 1E as defined in HI14.6.
a. Efficiencies at BEP shall meet or exceed specified efficiencies.
3. Testing shall demonstrate performance at Points A and C to conforms Acceptance Level 1B as defined in HI14.6.
a. Efficiencies at Points A and C shall be within 3% of efficiencies specified for these points.
4. Testing shall demonstrate shutoff head falls within ±10% of specified shutoff head unless City elects to waive this requirement.
5. Pump Manufacturer, if not listed above, shall in City’s opinion meet criteria for product substitution procedures specified in Section 01 63 00.
6. At City’s option, penalties described under Section 01 22 00 may be assessed for failing pumps in lieu of rejecting installed pumps.
2.2 Materials
A. Refer to Section 01 61 00 for basic requirements for products and materials.
B. Pumps and attached motors shall be constructed in accordance with AWWA E103.
C. Pumps and attached motors shall be rated for continuous duty and shall operate smoothly throughout their specified pumping range without surging, cavitation or vibration.
D. Castings shall be free from blow holes, sand holes and other flaws and shall be accurately machined and fitted to close dimensions.
E. Materials for horizontal centrifugal split-case pumps shall be:
ITEM MATERIAL SPECIFICATION
Horizontal Centrifugal
Pumps
Varies by part Conform to AWWA E103 Table 1
PUMP ASSEMBLY
Pump Casing Cast Iron Conform to ASTM A48 Class 30
Suction and Discharge
Flanges
Working Pressures 0-150
psi
Ductile Iron Conform to ASME/ANSI B16.42 Class 150
Raised- or flat-faced
Cast Iron Conform to ASME/ANSI B16.1 Class 125
Raised- or flat-faced
Suction and Discharge
Flanges
Working Pressures 150-250
psi
Ductile Iron Conform to ASME/ANSI B16.42 Class 150
Raised- or flat-faced
Flange Alignment Pumps Boltholes shall straddle horizontal and vertical centerlines of pump and discharge head
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 3-22-dp 43 23 13 – Horizontal Centrifugal Frame Mounted End Suction- 7 of 14
ITEM MATERIAL SPECIFICATION
Flange Bolts, Nuts, and
Washers
Various Steels Refer to Section 33 05 31.
Flange Gaskets Refer to Section 33 05 31.
Volute Lining Fusion-Bonded
Epoxy
Refer to Section 09 96 56.
Conform to AWWA C213 and C550
12-mil minimum DFT
Do not coat bronze or stainless steel parts
Impellers or Stainless Steel Conform to ASTM A276
Impeller Bearings Bronze
Casing Wear Ring or Stainless Steel Conform to ASTM A276 Impeller Wear Ring Nickel-Aluminum
Bronze or
Stainless Steel
Conform to ASTM B148 alloy 952, 953, 954, 955, 956, or 958 OR ASTM A276
Shaft Stainless Steel Conform to ASTM B582 SAE Type 416 Conform to ASTM A276 SAE Type 316 if TDS>1000 ppm
Shaft Sleeve Stainless Steel Conform to ASTM A743 SAE Type 316
SEALS AND LUBRICATION
Mechanical Seals Body SAE Type 316 Stainless Steel
O-ring Viton / FKM Rubber
Lubricating Oil Food Grade Oil NSF/ANSI 60 listed for potable water applications
HARDWARE
Fasteners, Bolts, Cap
Screws, Anchor Bolts, Nuts,
Washers and External
Hardware
Stainless Steel SAE Type 316
Pump Nameplates Stainless Steel SAE Type 316
Permanently attach to discharge head frame with information impressed, engraved or embossed into plate
Pump nameplates shall show Manufacturer’s name, model and serial number, year of manufacture, rpm, horsepower, impeller diameter, rated flow capacity, head rating and NPSHR.
See below for motor nameplate data
PROTECTIVE COATINGS
Pump Exterior Finish Coat Fusion-Bonded
Epoxy or Epoxy
Urethane
Refer to Section 09 90 00 or 09 96 56.
12 mil minimum thickness
F. Materials for motors shall be:
ITEM MATERIAL SPECIFICATION
HORIZONTAL MOTORS
Motor Frames Cast Iron Conform to NEMA MG1
Provide frame assignments per NEMA MG13
Motor Terminal Boxes Cast Iron Conform to ASTM A48
Screens over Openings Stainless Steel Required on WP1 motors 7.5-horsepower and larger Stator Windings Copper
Fasteners, Bolts, Cap
Screws, Anchor Bolts,
Nuts, Washers and
External Hardware
Stainless Steel SAE Type 316
Flexible Connectors Neoprene Do not use flexible metal hose, either braided or unbraided.
Motor Nameplates Stainless Steel SAE Type 316
Permanently attach to motor frame with information impressed, engraved, or embossed into plate.
Show information required by NEMA MG1-10.39 et seq Show Manufacturer’s name, model and serial number
Show year of manufacture
Show rpm, horsepower, input voltage, phase, and frequency, Show full load current and locked-rotor kVA code
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 3-22-dp 43 23 13 – Horizontal Centrifugal Frame Mounted End Suction- 8 of 14
ITEM MATERIAL SPECIFICATION
Show motor type, frame, insulation class, centigrade degree rise and motor connection diagram.
Show bearing numbers for both bearings
Show efficiency and power factor at full load, and maximum recommended kVAR of power capacitors to result in 90% power factor.
G. The following product design criteria, options and accessories are required for pumps:
ITEM DESCRIPTION
Pump Design Criteria
Q (gpm) TDH (ft)
Pump
Efficiency
η
HP drawn at
operating
point (hp)
Shutoff 0 19.54 0% 1.10
A 348 17.8 75% 2.08
B (BEP) 450 15 77% 2.28
C 556 12.1 71% 2.39
Notes: See Peerless Model 4X6-10 MTP 8196 – 1 stage –
9.26” Impeller Trim
Net Positive Suction Head
Available NPSHA
32 ft
Specific Speed NS Ns = 1980
Pump Speed Operating points shown are for 900 rpm
Maximum Solid Size 3”
PUMP ASSEMBLY
Casing Type Upper and Lower half-castings containing volute and suction passages.
Upper half casing shall be fully removable without
disturbing suction or discharge piping.
Air Release Tap Drill and tap highest point in upper casing for air release or pump priming tap.
Drain Tap Drill and tap lowest point in lower casing for drain tap.
Drilling and Tapping Provide tapped connection for air release valve Bearings Bearing Life ANSI/ABMA 9 L10 ≥ 50,000 hours
Lubrication Grease Lubricated via Zerk fittings
SEALS, LUBRICATION, AND FLUSHING
Pump Seals Type Mechanical Seals
Drip Ring Required
Mechanical Seals Tungsten Carbide
Silicon Carbide Carbon No 5 stationary face
Direct-sintered Silicon Carbide rotating face
Carbon
Ceramic
Lubricating Oil Food Grade Oil NSF/ANSI 60 listed for potable water applications H. The following electrical design criteria are required for equipment specified in this section:
ITEM DESCRIPTION
Electrical Work NEC Article 505 Classification Nonhazardous
Enclosures – Outdoor or
Wet Locations
NEMA 250 Enclosure Rating NEMA 4X – Watertight, Corrosion-Resistant, Stainless steel
Enclosures Construction Lockable
With powdercoat epoxy finish on steel surfaces
IEC 60529 Enclosure Rating for
Underground Equipment
IP 65 water jet
Control Panel Mounting Remote Mount MCC
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 3-22-dp 43 23 13 – Horizontal Centrifugal Frame Mounted End Suction- 9 of 14
ITEM DESCRIPTION
Power Supply Motor Circuit 460VAC – 3ɸ – 60Hz
Heating Circuit 120VAC – 1ɸ – 60Hz
I. The following product design criteria, options and accessories are required for pump motors:
ITEM DESCRIPTION
HORIZONTAL MOTORS
Motors Motor Type Squirrel cage induction conforming to NEMA MG1 Operating Frequency 60 Hz
Synchronous Speed 900 rpm (8 pole)
Motor Nominal Horsepower 3 hp
Efficiency Premium Efficiency (RUS)
Stamp guaranteed efficiency on nameplate
Starting Code Code K
Locked-Rotor (Starting Inrush
Current) Design Code
Code K
Locked Rotor Current Conform to NEMA standards
Shall be ≤650% of motor full load current
Duty S1 Continuous Duty
Drive Shaft Solid Shaft
Extend through both bearings with proper length to
close couple directly to pump impeller
Temperature Rise NEMA Design B Rated for Operation at 40°C (104°F) Maximum temperature rise of windings measured by
resistance method shall be ≤ 90°C under continuous
operation at service factor horsepower, rated voltage,
and frequency
Safe Stall (Locked Rotor) Time Locked rotor time = 57 s (cold); 32 s (hot) Service Factor 1.15
Insulation Class F (155°C)
Motor insulation on VFD-driven motors shall meet
inverter-duty rating requirements of NEMA MG1, Part
31. Dip and bake totally enclosed motors in epoxy resin.
Completed insulation shall have resistance ≥1.5Mj
Vacuum-impregnate windings on open motors with
100% solid-epoxy resins when frames ≥ NEMA Frame
364.
Completed insulation shall have resistance ≥10Mj.
External Ground Connection / ⅜” for motors ≤100-hp
Bronze bolt and lock washer or bronze post
connector
Provide threaded motor frame hole to depth ≥1½ x
hole diameter to ensure firm connection.
If necessary, bond metal pad to motor frame to
provide required threaded hole depth.
Locate grounding means in connection box or on
same side of motor as main lead terminal box.
Overtemperature Protection
Motor Windings (motors
<200hp)
Provide automatic-reset normally closed bi-metallic
thermal overload thermostats in each phase of motor
windings per NEMA MG1
Control Leads on
Overtemperature Protection
Devices
Provide color coded control leads and terminate in
separate conduit box.
Lifting Lug Provide on motor, sized to permit lifting of motor.
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 3-22-dp 43 23 13 – Horizontal Centrifugal Frame Mounted End Suction- 10 of 14
ITEM DESCRIPTION
Other Requirements Insulate and brace windings for full voltage operation.
Motor nameplate horsepower shall not be exceeded
anywhere on pump curve.
Space Heaters (Outdoor
Applications)
120V - 1ɸ cartridge or flexible wrap-around type
condensation heaters
/ not required
Junction Box Motor shall have oversized power junction box and auxiliary junction box for overtemperature switch and
space heater circuit.
Motor Bearings Bearing Type Use angular contact ball thrust bearings, spherical roller thrust bearings or plate thrust bearings as
needed to meet required thrust loads and bearing life.
Bearing Life (at highest rated
motor speed and total load)
ANSI/ABMA 9 L10 of 50,000 hours
Lubrication Grease lubricated,
Prelubricate at factory
Bracing Brace and lock bearings to prevent shaft movement and to withstand high thrust loads in all directions.
Motor Enclosure Enclosure Total Enclosed Fan Cooled (TEFC) Motor Connection Boxes Design Bolted with adequate space for connections Gaskets Provide gaskets between box and housing and
between box and cover
Markings Permanently mark motor leads in agreement with connection diagram
Vibration Limit ≤ 0.002” peak-to-peak unfiltered when measured per MG1 20.54
Vibration Control Attach conduits and electrical connections to motor with slack flexible connectors located as near to
mechanical equipment as possible.
Where possible, install connector in pipe parallel to
motor shaft.
Coatings Epoxy Refer to Section 09 90 00.
Coat fabricated ferrous surfaces on inside and
outside surfaces except machined surfaces, shafts,
bearings, register fits, stainless steel surfaces,
moving parts, and nameplates.
Coat machined, polished, and non-ferrous surfaces
with corrosion-prevention compound.
Touch-up coated surfaces damaged during shipping.
Do not field-paint motors unless motor warranty
permits.
J. Motor torque and slip characteristics shall be as recommended by pump Manufacturer and as specified.
K. Motors shall start and accelerate driven equipment to design conditions without exceeding any specified design requirements.
1. Where motor horsepower specified above or shown on Plans appears undersized for pump specified, refer conflict to City’s Representative during submittal process for resolution.
PART 3 - EXECUTION
3.1 Preparation
A. Make field measurements needed to install pumps before submitting shop drawings or ordering.
1. Make minor changes in dimensions and alignments as needed to avoid utilities or structural conflicts.
B. Verify structures, piping, and equipment are compatible.
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 3-22-dp 43 23 13 – Horizontal Centrifugal Frame Mounted End Suction- 11 of 14 C. Prior to installation, provide 1 site visit and up to 4 hours of time on-site by pump Manufacturer's factory-authorized representative to provide the following services:
1. Ensure equipment shipped to job-site has been handled according to Manufacturer's recommendations and is in good working order.
2. Ensure equipment has been stored and protected according to Manufacturer's recommendations.
3. Inspect and verify structures or surfaces on which equipment will be mounted have no defects which might adversely affect installation.
D. Contractor shall promptly report to City, in writing, defects which may affect Work.
1. Provide 1 copy of Manufacturer's field report to City.
3.2 Installation
A. Refer to Section 01 73 00 for execution and installation requirements.
B. Furnish and install pumps at locations shown on Plans and Submittals.
C. The following installation standards shall be followed:
1. Applicable OSHA and Cal OSHA regulations
2. Applicable building, fire, plumbing, and electrical code requirements
3. Manufacturer’s installation and warranty requirements D. Refer variances between above documents and Contract Documents to City’s Representative.
E. Install pumps to tolerances recommended by Manufacturer.
1. Unless otherwise shown, install pumps true and level using precision gauges and levels.
F. Construct equipment sub-base plates and pump bases as follows:
1. Welding shall conform to ASME Boiler and Pressure Vessel Code, §VIII
2. Level baseplate in both directions.
3. Align shafts between driver and driven unit.
4. After completing leveling and base alignment and before grouting, tighten anchor bolts to proper torque value.
5. Grout baseplate in place.
G. Install pumps as follows:
1. Support piping independent of pump.
2. Plug taps and orifices not required for pump operation and controls.
3. Check and align unit components.
4. Make electrical connections in conformance with electrical plans and specifications.
5. Connect unit heaters per Manufacturer’s recommendations. a. Make final wiring connections with short lengths of moisture proof flexible conduit. b. Provide installation free from objectionable noise when heater is in operation.
6. For each pump, neatly place copper pipe to convey leakage to nearest drainage inlet. a. Provide compression fittings on copper pipe shall to allow disassembly.
7. Furnish and apply initial supply of grease and oil, recommended by Manufacturer.
3.3 Field Quality Control
A. Field testing shall include:
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 3-22-dp 43 23 13 – Horizontal Centrifugal Frame Mounted End Suction- 12 of 14
ITEM TEST FOR
TEST STANDARD
(ASTM OR OTHER TEST
STANDARD) FREQUENCY
FIRST
TEST PAID
FOR BY
RETESTS
PAID FOR
BY
Pumps
and
Motors
6-hour Field
Performance Test
to Demonstrate
Conformance to
Contract
Documents and
Manufacturer’s
Printed Literature
Conform to HI 14.6 and
requirements below to extent
possible in field.
Tests shall be witnessed by pump
Manufacturer’s factory-authorized
representative who shall certify
installed pumping system complies
with Contract Documents and
Manufacturer’s warranty
requirements, that interlock and
control features work properly, and
that no drive equipment or shafting
is overloaded at any point on
published pump curve.
One 6-hour test
each pump
Contractor Contractor
72-hour System
Demonstration
Refer to Section 01 79 00.
6-hour field performance tests may
be part of 72-hour system
demonstration.
1 for pumping
system
Contractor Contractor
Motor Current Record current in each phase of
each motor and include in O&M
manual.
Repair or replace motor or motordriven equipment if current > motor nameplate FLC value.
Each phase of
each motor
Contractor Contractor
Vibration Running test with vibration analyzer
per ANSI/HI 14.6
Do not exceed published HI
standards or 0.20 in/sec RMS in
absence of HI standards.
1 test each pump
during 6-hour field
performance test
Contractor Contractor
Installation, Noise,
Odors, Heat and
Leakage
Visual inspection of finished
installation
1 inspection City Contractor
11-month Warranty
Inspection
Demonstrate compliance to Contract
Documents and Manufacturer’s
printed literature
1 test City Contractor
B. Field performance testing shall conform to the following:
1. Verify Work conforms to Contract Documents
2. Field test using job-supplied flow meters and pressure gauges
3. Bump motor to ensure motor is connected for proper rotation.
4. Conduct infrared survey/testing of vertical turbine pump/motor assemblies.
5. Verify controls, alarms and safety shutdowns are operational.
6. Verify proper pump sequencing occurs.
7. Verify valves, including check valves, open and close properly.
8. Make adjustments required to place equipment in proper operating condition and to optimize operation.
C. Vibration testing shall conform to the following:
1. Provide services of specialist in this field to conduct tests.
2. Factory test and certify each motor operating without pump.
3. Field test and certify each pump.
4. Statically and dynamically balance rotating parts on pumps and motors before testing.
5. Test each installed pump and motor at each operating speed for compliance with specified vibration and critical frequency limits.
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 3-22-dp 43 23 13 – Horizontal Centrifugal Frame Mounted End Suction- 13 of 14
6. To determine critical frequency, perform bump tests on each pump in each of 2 orthogonal planes 1 of which shall include discharge elbow.
7. Determine natural frequency of pump support structure at each pump using bump test and analyzer with frequency finder.
8. Perform vibration measurements at upper motor bearing of each pump at each operating speed.
a. Provide measurements in each of 2 orthogonal horizontal directions 1 of which shall be in plane of greatest vibration and in addition provide measurement in vertical (pump axial) direction.
9. Conduct vibration level tests on each pump with pump operating at its rated capacity and motor/bearing temperatures stabilized.
10. Vibration when measured in direction of maximum amplitude shall not exceed limits given in latest ANSI/HI nomograph for pump.
11. Natural frequency of pump drive train shall not be within ±25% of drive train’s calculated critical speed at any point in operating range.
12. Adjust or replace units and/or modify dynamic balance, if required to meet specified vibration limits or to correct excessive vibration.
13. Provide gussets, stiffeners, additional mass, or other measures to conform to vibration limitations.
14. If installed pump vibrations exceed HI 2.4 thresholds, modify discharge head and other pumping components to correct deficiencies at no additional cost to City.
D. Provide services of pump and motor Manufacturers’ factory-authorized representatives onsite to witness and inspect startup of pump operation and perform the following services:
1. Provide technical assistance to Contractor during installation of pumping units.
2. Check alignment and inspect installation prior to final grouting and start-up.
3. Before startup, check equipment for proper lubrication, alignment, rotation, and freedom from excessive vibration.
4. Notify Contractor and City of irregularities of installation which might render pump Manufacturer’s warrantee null and void
5. Present City with punch list detailing problems noted and suggested remedial actions.
6. Prior to initial start-up, provide written statement equipment has been installed in accordance with Contract Documents and Manufacturer's installation and warranty instructions and is ready to be placed into operation.
7. Assist in initial start-up, adjustments and field testing, including vibration testing.
8. Test-operate system in City’s presence and verify equipment conforms to specified requirements.
9. If measured flows at above tabulated pump heads are >5% below flows obtained on factory test, adjust impellers or provide new impellers or otherwise repair or replace pumps or calibrate meters or pressure gages.
10. Assist in correction of defective or faulty Work before and after acceptance by City.
11. Re-visit job-site as often as necessary until all deficiencies are corrected and installation and operation is accepted by City.
12. Prepare report on pump performance for submittal to City.
E. Conduct field performance test in presence of City’s Representative and City’s personnel after ≥ 24 hours of field operation have occurred to burn in system.
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 3-22-dp 43 23 13 – Horizontal Centrifugal Frame Mounted End Suction- 14 of 14 F. If field performance tests show excessive vibration or fail to demonstrate compliance with requirements of Contract Documents or certified curves furnished, City shall have right to either:
1. Decline acceptance of failing pumps and require Contractor to replace them, or
2. Deduct agreed upon allowance for City’s incremental cost of additional power from payment due Contractor.
3.4 Field Training of City’s Personnel
A. In addition to the above, provide services of pump Manufacturer’s factory-authorized representative on-site for ≥8 man-hours (travel time excluded) to provide classroom instruction of City’s personnel in proper recommended lubrication, operation and maintenance procedures as well as procedures for proper lockout out of each energy source.
B. The following handouts shall be provided by Manufacturer’s factory-authorized representative to attendees during classroom instruction:
1. Listing of actions (or inactions) by City which would render Manufacturer’s warranty null and void.
2. Written description of proper lubrication procedures.
3. Written list of required scheduled maintenance including recommended service intervals to ensure warrantee remains valid and to ensure equipment remains functional.
4. Written description of procedures for lockout of each energy source.
END OF SECTION
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 9-19-dp 46 41 17 – Inline Static Mixers and Injection Equipment - 1 of 4 SECTION 46 41 17
INLINE STATIC MIXERS AND INJECTION EQUIPMENT
PART 1 - GENERAL
1.1 Work Included
A. Materials, testing, and installation of inline static mixers and injection equipment.
1.2 Related Work
A. Section 01 10 01: Summary of Work and Sequence of Construction B. Section 01 10 02: Sequence of Operation
C. Section 01 33 00: Submittal Procedures
D. Section 01 40 00: Quality Requirements
E. Section 01 61 00: Common Product Requirements
F. Section 01 65 00: Product Delivery Requirements
G. Section 01 66 00: Product Storage and Handling Requirements H. Section 01 73 00: Execution
I. Section 05 05 19: Post-Installed Concrete Anchors
J. Section 09 90 00: Painting and Coating
K. Section 09 96 56: Epoxy Linings and Coatings
1.3 System Description
A. Furnish and install complete injection / static mixing equipment including appurtenant structural and/or, mechanical or connections required for compliance with Manufacturer’s installation requirements and compliance with applicable building codes and standards.
1.4 Quality Assurance
A. Use adequate numbers of skilled workmen trained and experienced in necessary trades and crafts and completely familiar with specified requirements and methods for proper performance of Work of this section.
1.5 References
A. Reference publications below form part of this specification to extent referenced and are referred to within text by basic designation only.
1. ASME/ANSI B16.5 Steel Pipe Flanges and Flanged Fittings (Including ratings for Class 150, 300, 400, 600, 900, 1500, and 2500)
2. AWWA C207 Steel Pipe Flanges
3. AWWA C653 Disinfection of Water Treatment Plants
4. California Building Code (CBC)
5. California Electrical Code (CEC)
6. California Fire Code (CFC)
7. California Mechanical Code (CMC)
8. California Plumbing Code (CPC)
9. NEMA/ANSI 250 Enclosures for Electrical Equipment
10. NFPA 70 National Electric Code (NEC)
11. NSF/ANSI 61 Drinking Water System Components – Health Effects DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 9-19-dp 46 41 17 – Inline Static Mixers and Injection Equipment - 2 of 4
1.6 Submittals
A. Furnish the following submittals.
SUBMITTAL DESCRIPTION
DRAWINGS
Shop Drawings Submit per pipeline equipment Shop Drawing requirements. .
MANUFACTURER’S LITERATURE
Product Data Submit per Product Data requirements.
Installation Instructions Submit per Installation Instruction requirements.
CLOSEOUT SUBMITTALS
O & M Instructions Submit per Operation and Maintenance Instruction requirements.
Warranty Furnish 1-year warranty from date of final acceptance.
B. Refer to Section 01 33 00 for definition of requirements for Shop Drawings, Product Data, Installation Instructions, and O&M instructions.
1.7 Delivery, Storage, and Handling
A. Refer to Sections 01 65 00 and 01 66 00 for delivery, storage, and handling requirements.
B. Strictly follow Manufacturer’s instructions and warranty requirements for delivery, storage, and handling of static mixers and injection equipment.
1.8 Project Site Conditions
A. Refer to Section 01 10 01 for full list of project site conditions.
PART 2 - PRODUCTS
2.1 Acceptable Manufacturers
A. Refer to City of Corona List of Sole-Source Equipment for Water Facilities for acceptable Manufacturers for injection quills.
B. Refer to City of Corona List of Sole-Source Equipment for Water Facilities for acceptable Manufacturers for static mixers.
C. Acceptable Manufacturers include:
ITEM MANUFACTURER MANUFACTURER LOCATION
SAF-T-FLO Water Services, Inc. Anaheim, CA (800) 957-2383 Irwindale, CA (626) 856-5656
Sodium
Hypochlorite
Injection Quill
Features Option Manufacturer’s Code
Basic Model Retractable 250 psi rated ½”
and ¾” Main Connection X ½”
and ⅜” Solution Tube
EB168
Valve/Compression
Material
Stainless Steel S
Solution Tube Material Hastelloy® C276 H
12” and 4” 12/4
Tip Configuration Saf-T-Seal Tip – Viton CV
Check Valve Option
(Same material as solution
tube)
Check Valve – Viton O-Rings V
Flexible Hose Assembly FTA
Accepted equal
Static Mixer Komax Systems, Inc. Huntington Beach, CA (714) 933-7400 No exception
2.2 Materials
A. Refer to Section 01 61 00 for basic requirements for products and materials.
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 9-19-dp 46 41 17 – Inline Static Mixers and Injection Equipment - 3 of 4 B. Materials for injection quills shall be:
ITEM MATERIAL SPECIFICATION
Ball Valve PVC SCH 80
Hastelloy® C276
Stainless Steel SAE Type 316
Ball Valve Sodium
Hypochlorite
Hastelloy® C276 1” and ½”
Solution Tube PFA
PVDF (Kynar)
PVC
Stainless Steel SAE Type 316
Hastelloy® C276
Length 6” / 12” / 18”
Solution Tube Sodium
Hypochlorite
PFA
Length 6” / 12” / 18”
Tip Configuration (<1”
inlet)
Saf-T Seal FPM
(Viton)
Check Valve PVC
Inlet Connection PVC ½” NPT
Safety Chains Stainless Steel SAE Type 316 – two required Assembly Rated for pressures 0-250psi
C. The following product design criteria, options and accessories are required:
ITEM DESCRIPTION
Chemical Criteria Fluid Injected 15% Sodium Hypochlorite Solution Receiving Fluid Recycled Water
Hydraulic Criteria Injection Flow Rate 300 gal/hr
Receiving Fluid Flow Rate 10,000 gpm
Density 62.4 pcf
Viscosity
Pressure 3-15 psi
Temperature 60-80°F
Number of Injection
Fittings on Static Injection
Mixer
2 PART 3 - EXECUTION
3.1 Preparation
A. Refurbish and install static mixer as stated on the Plans. Provide pressure wash of exterior coatings and advice City of any interior deflects. Recoat exterior per Section 09 90 00,
1. Make minor changes in dimensions and alignments as needed to avoid utilities or structural conflicts.
3.2 Installation
A. Refer to Section 01 73 00 for basic execution and installation requirements.
B. Furnish and install injection equipment at locations shown on Plans and Submittals.
C. The following installation standards shall be followed:
1. Applicable OSHA and Cal OSHA regulations
2. Applicable building and plumbing code requirements
3. Manufacturer’s installation and warranty requirements D. Refer variances between above documents and Contract Documents to City’s Representative.
E. Install injection equipment to tolerances recommended by Manufacturer.
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C 9-19-dp 46 41 17 – Inline Static Mixers and Injection Equipment - 4 of 4
1. Unless otherwise shown, install equipment true, plumb, and level using precision gauges and levels.
3.3 Field Quality Control
A. Field testing shall include:
ITEM TEST FOR
TEST STANDARD
(ASTM OR OTHER TEST STANDARD) FREQUENCY
FIRST
TEST PAID
FOR BY
RETESTS
PAID FOR
BY
Static Mixers
and Injection
Equipment
Installation &
Leakage
Visual inspection of finished installation 1 inspection City City Field
Performance
Demonstrate compliance to Contract
Documents and Manufacturer’s printed
literature
1 test Contractor Contractor
11-month
Warranty
Inspection
Demonstrate compliance to Contract
Documents and Manufacturer’s printed
literature
1 inspection City Contractor
END OF SECTION