Page 1 of 8 ends

TTM 37895
MND Addendum | Mitigation Monitoring Plan
TENTATIVE TRACT MAP 37895

MITIGATION MONITORING AND REPORTING PROGRAM
No. Mitigation Measures Implementation
Action
Method of
Verification
Timing of
Verification
Responsible
Person
Verification
Date

GEOLOGIC
GEO-1 Prior to construction, loose and perched boulders shall be removed from the face of the slope.

Condition of
Approval
Field Verification During Grading &
Construction
Activities
Planning &
Development
Dept,
Development
Services Division
GEO-2 During earthwork construction, the applicant shall adhere to the grading recommendations presented in
the Preliminary Geotechnical Investigation prepared
by Geocon Inland Empire Inc. (2006).

Condition of
Approval
Field Verification During Grading &
Construction
Activities
Planning &
Development
Dept,
Development
Services Division
GEO-19 The paleontologist shall salvage all fossils in the area and provide additional field staff in accordance with
modern paleontological techniques.

Condition of
Approval
Field Verification During Grading &
Construction
Activities
Planning &
Development
Dept, Planning
Division
GEO-20 All fossils collected during the project will be prepared to a reasonable point of identification. Excess
sediment or matrix will be removed from the
specimens to reduce the bulk and cost of storage.

Itemized catalogs of all material collected and
identified will be provided to the museum repository
along with the specimens.

Condition of
Approval
Submittal of
documentation
During Grading &
Construction
Activities
Planning &
Development
Dept, Planning
Division

Page 2 of 8 ends

TTM 37895
MND Addendum | Mitigation Monitoring Plan
No. Mitigation Measures Implementation
Action
Method of
Verification
Timing of
Verification
Responsible
Person
Verification
Date
GEO-21 A report prepared by the archeologist documenting the results of the monitoring and salvage activities and the significance of the fossils shall be prepared.

Condition of
Approval
Submittal of
report
Upon completion
of grading
activities.

Planning &
Development
Dept, Planning
Division

AIR QUALITY
AIR-3 During site preparation and grading activities, the applicant or its contractor shall control airborne dust and PM10/PM2.5 by watering all active areas at least
three times per day, as dictated by local soil and wind conditions. If visible emissions of fugitive dust persist beyond a distance of 200 feet from the boundary of
the construction site, all feasible measures shall be
implemented to eliminate potential nuisance
conditions at offsite receptors.

Condition of
Approval
Field Verification During Grading &
Construction
Activities
Planning &
Development
Dept,
Development
Services Division

TRANSPORTATION
TRANS-1
*NEW*
Prior to map recordation, the project shall constrict or if the signal is constructed, provide a fair share
payment for the installation of the traffic signal at the intersection of State Street/Ontario Avenue.

Condition of
Approval
Field Verification Prior to map
recordation
Public Works
Dept, Traffic
Division
TRANS-2
*NEW*
The following circulation improvements are
recommended to enhance safe vehicle within the
project area:
• Prior to issuance of first Certificate of
Occupancy, Laurel Canyon Way, adjacent to
the project boundary, shall be constructed at its
ultimate half-section width, including
landscaping and parkway improvements in
conjunction with development per City
standards.
• Prior to map recordation, the applicant shall
obtain approval of a secondary access road
Condition of
Approval
Field Verification
• Prior to
issuance of first
Certificate of
Occupancy
• Prior to map
recordation
Public Works
Dept, Traffic
Division

Page 3 of 8 ends

TTM 37895
MND Addendum | Mitigation Monitoring Plan
No. Mitigation Measures Implementation
Action
Method of
Verification
Timing of
Verification
Responsible
Person
Verification
Date
(Shadow Valley Drive) from the County of
Riverside.
• Prior to issuance of a building permit, the
project shall provide a secondary access road
(Shadow Valley Drive) through the southern
portion of the site which would create a stopcontrolled secondary access driveway at State Street for project residents only.
• All roadway design, traffic signing and striping,
and traffic control improvements relating to the
proposed project should be constructed in
accordance with applicable engineering
standards and to the satisfaction of the City of
Corona and applicable portions to the County of
Riverside.
• Prior to issuance of first Certificate of
Occupancy, site-adjacent roadways shall be
constructed or repaired at their ultimate halfsection width, including landscaping and parkway improvements in conjunction with
development, or as otherwise required by the
City of Corona.
• Onsite traffic signing and stripping plans shall
be submitted to City of Corona for approval in
conjunction with detailed construction plans for
the project.
• The final grading, landscaping, and street
improvement plans should demonstrate that
sight distance standards are met in accordance
with applicable City of Corona, County of
Riverside and California Department of
Transportation sight distance standards.
• Prior to
issuance of a
building permit
• Prior to
issuance of first
Certificate of
Occupancy
• Prior to
issuance of first
Certificate of
Occupancy
• Prior to the
construction of
the streets
•Prior to
issuance of a
building permit

Page 4 of 8 ends

TTM 37895
MND Addendum | Mitigation Monitoring Plan
No. Mitigation Measures Implementation
Action
Method of
Verification
Timing of
Verification
Responsible
Person
Verification
Date
• The northeast and southeast corners of the
project site access driveway at State Street
shall be limited to low growing ground cover
and/or hardscape to ensure that overgrown
landscape would not obstruct driver views
along State Street. The final Improvement
Plans for the State Street project driveway
access shall be approved by the City of Corona
and County of Riverside.
•Prior to
issuance of a
building permit
T-4 Prior to the issuance of the first Certificate of
Occupancy, the northbound shared left/through/right
turn lane of Compton Avenue at Old Temescal Road
shall be widened and/or restriped to provide an
exclusive left-turn lane and a shared through-right turn lane.

Condition of
Approval
Field Verification
T-5 Prior to the recordation of TTM 36533, the applicant shall pay the fair share cost of 9.55 percent towards
the construction of a two-phased signal traffic signal at the intersection of Rimpau Avenue at Old Temescal
Road. In addition, the northbound shared left-through
lane shall be restriped to provide an exclusive left-turn lane and the southbound shared left-through lane
shall be restriped to provide an exclusive left turn lane.

Condition of
Approval
Field Verification

BIOLOGICAL RESOURCES
BIO-6 A pre-construction survey for avian nests within seven (7) days of vegetation clearance or grading of the
project site, if grading permits are to be issued during the nesting season, March 1st through September 1st.

Condition of
Approval
At time of plan
check
BIO-7 If passerine birds are found to be nesting, a 250-foot buffer is required around the nesting site, in which the vegetation cannot be disturbed. In the event that the
nest is for a raptor, the buffer shall be expanded to
Condition of
Approval
At time of plan
check

Page 5 of 8 ends

TTM 37895
MND Addendum | Mitigation Monitoring Plan
No. Mitigation Measures Implementation
Action
Method of
Verification
Timing of
Verification
Responsible
Person
Verification
Date
500-feet. If multiple nests are found, grading and
grubbing of the project site shall be postponed.

BIO-8 A qualified biologist shall closely monitor the project site and nests until it is determined that the nests are no longer active.

Condition of
Approval
At time of plan
check
BIO-9 Prior to the issuance of a grading permit, applicable Section 404 permit from the U.S. Army Corps of
Engineers and a Streambed Alteration Permit
pursuant to Fish and Wildlife Code 1602, and Section
401 Water Quality Certification from the Regional
Water Quality shall be obtained.

Condition of
Approval
At time of plan
check
BIO-10 A Water Quality Management Plan and SWPPP shall
be prepared and implement BMPs (Best Management
Practices) that will prevent habitat degradation caused by runoff within the adjacent conservation area and
pollutants from vehicles and paved surfaces are
organic compounds, metals, and oil/grease; from pet
waste are bacteria/virus pathogens; and from
landscaping are sediment, nutrients, oxygendemanding substances, and herbicides/pesticides.

Condition of
Approval
At time of plan
check
BIO-11 Any lighting used within proximity of the conservation area will be shielded and directed away from the
conservation area.

Condition of
Approval
At time of plan
check
BIO-12 Landscape plans prepared for the project shall not include invasive species identified in MSHCP Table 6-

2. Condition of
Approval
At time of plan
check
BIO-13 The proposed project shall incorporate barriers, as necessary, to minimize unauthorized public access,
domestic animal predation, illegal trespass, and
dumping in the MSHCP Conservation Area. Such
barriers may include native landscaping,
Condition of
Approval
At time of plan
check

Page 6 of 8 ends

TTM 37895
MND Addendum | Mitigation Monitoring Plan
No. Mitigation Measures Implementation
Action
Method of
Verification
Timing of
Verification
Responsible
Person
Verification
Date
rocks/boulders, fencing, walls, signage, and/or other
appropriate mechanisms.

BIO-14 Manufactured slopes associated with proposed site development shall not extend into the MSHCP
Conservation Area.

Condition of
Approval
At time of plan
check

CULTURAL RESOURCES
CR-15 If human remains are encountered, California Health and Safety Code Section 7050.5 states that no further
disturbance shall occur until the Riverside County
Coroner has made the necessary findings as to origin.

Further, pursuant to California Public Resources Code
Section 5097.98(b) remains shall be left in place and
free from disturbance until a final decision as to the
treatment and disposition has been made. If the
Riverside County Coroner determines the remains to
be Native American, the Native American Heritage
Commission must be contacted within 24 hours. The
Native American Heritage Commission must then
immediately identify the “most likely descendant(s)”
of receiving notification of discovery. The most likely descendant(s) shall then make recommendations
within 48 hours and engage in consultations
concerning the treatment of the remains as provided
in Public Resources Code 5097.98.

Condition of
Approval
Field Verification
CR-16 The landowner shall relinquish ownership of all
cultural resources, including sacred items, burial
goods and all archaeological artifacts that are found
on the project area to the appropriate Tribe for proper treatment and disposition.

Condition of
Approval
Field Verification
CR-17 All sacred sites, should they be encountered within the project area, shall be avoided and preserved as the
preferred mitigation, if feasible.

Condition of
Approval
Field Verification

Page 7 of 8 ends

TTM 37895
MND Addendum | Mitigation Monitoring Plan
No. Mitigation Measures Implementation
Action
Method of
Verification
Timing of
Verification
Responsible
Person
Verification
Date
CR-18 If inadvertent discoveries of subsurface
archaeological/cultural resources are discovered
during grading, the Developer shall retain a qualified
archaeologist to assess the significance of such
resources. Pursuant to California Public Resources
Code Section 21083.2(b) avoidance is the preferred
method of preservation for archaeological resources.

The archaeologist shall be responsible for determining
the significance of the cultural resource and mitigation for such resources. The archaeologist shall make the
determination based on the provisions of the
California Environmental Quality Act with respect to
archaeological resources and shall take into account
the religious beliefs, customs, and practices of the
Tribe(s). If large fossil specimens are encountered
during additional grading, the applicant shall
immediately cease operation and retain a qualified
and trained paleontologist.

Condition of