Exhibit 4 - Historic Preservation Board Staff Report dated July 27, 2026.pdf

Corona City Council
August 5, 2026

Document
Exhibit 4 - Historic Preservation Board Staff Report dated July 27, 2026.pdf
Meeting
August 5, 2026
Body
Corona City Council
Pages
178
Original file
72.1 MB
Text extracted from the city's file for reading and search. Open the original on pub-corona.escribemeetings.com. That file is the official record.

impacts in Corona. Compliance with State, County, and local requirements, including the adherence to the CBC and review by the CFD to reduce fire hazards, impacts of fire hazards would be less than significant.

5.9.2 Impacts Associated with the Proposed Project
Would the project:

Environmental Issues
Condition 1:

Substantial
Change in
Project
Requiring
Major
Revisions
Condition 2:

Substantial
Change in
Circumstances
Requiring
Major
Revisions
Condition 3:

New
Information
Showing New
or Increased
Significant
Effects
Less Than
Significant
Impact/No
Changes or
New
Information
Requiring
Preparation of
an EIR/MND No Impact
a) Create a significant hazard to the public or
the environment through the routine
transport, use, or disposal of hazardous
materials?
X
b) Create a significant hazard to the public or
the environment through reasonably
foreseeable upset and accident conditions
involving the release of hazardous materials
into the environment?
X
c) Emit hazardous emissions or handle
hazardous or acutely hazardous materials,
substances, or waste within one-quarter
mile of an existing or proposed school?
X
d) Be located on a site which is included on a
list of hazardous materials sites compiled
pursuant to Government Code § 65962.5
and, as a result, would it create a significant
hazard to the public or the environment?
X
e) For a project located within an airport land
use plan or, where such a plan has not been
adopted, within two miles of a public airport
or public use airport, would the project result
in a safety hazard or excessive noise for
people residing or working in the project
area?
X
f) Impair implementation of or physically
interfere with an adopted emergency
response plan or emergency evacuation
plan?
X
g) Expose people or structures, either directly
or indirectly, to a significant risk of loss,
injury or death involving wildland fires?
X

CITY PARK REVIT A LIZATION PROJECT EIR ADDENDUM

CITY OF CORONA

5. Environmental Analysis
June 2026 Page 99
a) Create a significant hazard to the public or the environment through the routine transport, use, or disposal of hazardous materials?
Less Than Significant Impact/No Changes or New Information Requiring Preparation of an EIR/MND. Construction of the proposed project would require small amounts of hazardous materials during construction, such as vehicle fuels, lubricants, grease and transmission fluids, and paints and coatings. The handling, use, transport, and disposal of hazardous materials during the construction phase of the proposed project would comply with existing regulations of several agencies—the Environmental Protection Agency (EPA), California Division of Occupational Safety and Health, US Occupational Safety and Health Administration (OSHA), and US Department of Transportation (USDOT).

Operation of the proposed project would transport, use, store, and dispose of small amounts of hazardous materials typical of park facilities such as cleaning and maintenance supplies (cleaners, gasoline, paint, and pesticides). The proposed project includes the construction of a community center and park facilities that would use cleaners and other chemicals in relatively small quantities, which are not typically considered hazardous materials that could result in a significant hazard to the public or the environment. No manufacturing, industrial, or other uses utilizing large amounts of hazardous materials would occur within Corona City Park. Compliance with applicable federal and state laws and regulations governing the use, storage, transport, and disposal of hazardous materials would ensure that all potentially hazardous materials are used and handled in an appropriate manner and would minimize the potential for safety impacts to occur; and in accordance with General Plan policy PS-3.1. Therefore, the proposed project would not create substantial hazards to the public or the environment. Therefore, as with the Approved Project, a less than significant impact would occur under the proposed project. Accordingly, no new significant impacts or impacts of greater severity than those identified in the 2020 Certified EIR would occur. No changes or new information would require preparation of a supplemental or subsequent EIR. b) Create a significant hazard to the public or the environment through reasonably foreseeable upset and accident conditions involving the release of hazardous materials into the environment? Less Than Significant Impact/No Changes or New Information Requiring Preparation of an EIR/MND. As discussed in Section 5.9(a), construction activities would require small amounts of hazardous materials, which may include vehicle fuels, lubricants, grease and transmission fluids, as well as paints and coatings. The use, transportation, and disposal of hazardous materials would be in accordance with regulatory standards and manufacturers’ specifications. Hazardous materials would be used in small quantities and properly stored so they do not pose health and safety hazards. Operation of the proposed project would transport, use, store, and dispose of small amounts of hazardous materials typical of park facilities which includes cleaning and maintenance supplies (such as cleaners, gasoline, paint, and pesticides). Compliance with applicable federal and state laws and regulations governing the use, storage, transport, and disposal of hazardous materials would reduce impacts. Therefore, the proposed project would not create a significant hazard to the public or environment, and impacts would be less than significant. Accordingly, no new significant impacts or impacts of greater severity than those identified in the 2020 Certified EIR would occur. No changes or new information would require preparation of a supplemental or subsequent EIR.

CITY PARK REVITALIZATION PROJECT EIR ADDENDUM

CITY OF CORONA

5. Environmental Analysis

Page 100 ends

c) Emit hazardous emissions or handle hazardous or acutely hazardous materials, substances, or waste within one-quarter mile of an existing or proposed school? Less Than Significant Impact/No Changes or New Information Requiring Preparation of an EIR/MND. The project site is located at 930 East 6th Street, and the closest school campus to the site is Lincoln Fundamental Elementary School approximately 0.30 miles south. As discussed in Section 5.9.2(a), the construction and operation of the proposed project would include the handling of small amounts of hazardous materials typical of construction activities and park athletic activities (during operation). The use, transportation, and storage of hazardous materials would be required to comply with all applicable state and federal regulations that would ensure the proper handling of such materials. As discussed in Section 5.9.2(b), there is no evidence that a hazardous materials release or threatened release has occurred on the project site or within a 1,500-foot radius of the project site. The proposed project would not emit hazardous emissions or handle hazardous or acutely hazardous materials, substances, or waste. Thus, impacts would be less than significant. Accordingly, no new significant impacts or impacts of greater severity than those identified in the 2020 Certified EIR would occur. No changes or new information would require preparation of a supplemental or subsequent EIR.
d) Be located on a site which is included on a list of hazardous materials sites compiled pursuant to Government code Section 65962.5 and, as a result, would it create a significant hazard to the public or the environment?
Less Than Significant Impact/No Changes or New Information Requiring Preparation of an EIR/MND. The project site is currently developed with the Corona City Park and associated facilities. Five environmental lists were searched for hazardous materials that may exist on the project site:
 EnviroStor. Hazardous Waste and Substances Site List. Department of Toxic Substances Control. (DTSC 2025a)
 GeoTracker. Leaking Underground Storage Task Sites. State Water Resources Control Board. (SWRCB 2025)
 CalEPA. Solid Waste Disposal Sites Identified by the Water Board with Waste Constituents above Hazardous Waste Levels Outside the Waste Management Unit.(CalEPA 2025a)  CalEPA. List of Active Cease and Desist Orders and Cleanup and Abatement Orders from the Water Board. (CalEPA 2025b)
 Hazardous Waste Facilities Subject to Corrective Action. Department of Toxic Substance Control. (DTSC 2025b)
Based on the records search, the project site is not listed on any of the five databases listed above, and no offsite improvements are proposed. Therefore, the proposed project would not create a hazard to the public because of a hazardous materials site compiled pursuant to Government Code Section 65962.5. Additionally, the project site would continue to operate as a park, and the proposed project would not include any components that would introduce new hazardous materials to the project site. Impact would be less than

CITY PARK REVIT A LIZATION PROJECT EIR ADDENDUM

CITY OF CORONA

5. Environmental Analysis
June 2026 Page 101
significant. Accordingly, no new significant impacts or impacts of greater severity than those identified in the 2020 Certified EIR would occur. No changes or new information would require preparation of a supplemental or subsequent EIR.
e) For a project located within an airport land use plan or, where such a plan has not been adopted, within two miles or a public airport or public use airport, would the project result in a safety hazard or excessive noise for people residing or working in the project area? No Impact. The closest airports to the project site are the Corona Municipal Airport (2.85 miles northwest of the project site) and the Riverside Municipal Airport (8.10 miles northeast of the project site). According to the City of Corona GIS mapper, the project site is not within the Corona Municipal Airport influence area (Corona 2024a). The project site is not within two miles of a public airport or public use airport. Therefore, as with the Approved Project, a less than significant impact would occur under the proposed project. Accordingly, no new significant impacts or impacts of greater severity than those identified in the 2020 Certified EIR would occur. No changes or new information would require preparation of a supplemental or subsequent EIR. f) Impair implementation of or physically interfere with an adopted emergency response plan or emergency evacuation plan?
Less Than Significant Impact/No Changes or New Information Requiring Preparation of an EIR/MND. Construction of the proposed project could temporarily affect local traffic circulation and roadway capacity due to lane closures, narrowing, or detours required for roadway and/or utility improvements.

These temporary disruptions could potentially affect emergency access or response times in the immediate vicinity. However, impacts would be minimized through implementation of standard construction traffic control measures, such as coordination with CFD and the Corona Police Department, posting of detour signage, and limiting lane closures to off-peak hours. The construction staging area would be adjacent to the project site would avoid obstructing emergency access routes. With these measures in place, construction activities would not substantially impair emergency response or evacuation routes With implementation of the proposed project, the project site would continue to operate as a public park. The park does not contain or border any designated emergency evacuation routes, and ongoing park operations would not increase traffic or change conditions in a way that could interfere with emergency response.

Therefore, operation of the proposed project would not conflict with adopted emergency response plans or emergency evacuation plans. The proposed project would also be required to comply with CFD requirements pertaining to access/egress to ensure adequate emergency access. Therefore, the proposed project would not impair an adopted emergency response plan or evacuation plan, and a less than significant impact would occur.

Accordingly, no new significant impacts or impacts of greater severity than those identified in the 2020 Certified EIR would occur. No changes or new information would require preparation of a supplemental or subsequent EIR.

CITY PARK REVITALIZATION PROJECT EIR ADDENDUM

CITY OF CORONA

5. Environmental Analysis

Page 102 ends

g) Expose people or structures, either directly or indirectly, to a significant risk of loss, injury or death involving wildland fires?
Less Than Significant Impact/No Changes or New Information Requiring Preparation of an EIR/MND. As discussed in Section 5.20, Wildfire, the project site is located in a local responsibility area. The project site is not located in a state responsibility area (SRA) or lands classified as a designated Very High Fire Hazard Severity Zone (CAL FIRE 2023). The proposed project would provide park improvements to the project site to support the existing residences and communities’ recreational needs. The proposed project would not construct new housing or induce population growth in the City. Structures on-site and emergency access would be designed and constructed in accordance with the CBC and Fire Code. As further discussed in Section

5.15, Public Services, the proposed project would be adequately served by the CFD. Therefore, the proposed project would not expose people or structures to significant risk of loss, injury, or death involving wildland fires, and less than significant impact would occur. Accordingly, no new significant impacts or impacts of greater severity than those identified in the 2020 Certified EIR would occur. No changes or new information would require preparation of a supplemental or subsequent EIR.

5.9.3 Adopted Mitigation Measures Applicable to the Proposed Project No mitigation measures related to hazards and hazardous materials were outlined in the 2020 Certified EIR.

CITY PARK REVIT A LIZATION PROJECT EIR ADDENDUM

CITY OF CORONA

5. Environmental Analysis
June 2026 Page 103

5.10 HYDROLOGY AND WATER QUALITY

5.10.1 Summary of Impacts Identified in the Program EIR The 2020 Certified EIR concluded that the Approved Project resulted in less than significant impacts to hydrology and water quality.

Water Quality Standards and Waste Discharge Requirements Urban runoff resulting from storms or nuisance flows (runoff during dry periods) from development projects can carry pollutants to receiving waters. Runoff can contain pollutants such as oil, fertilizers, pesticides, trash, soil, and animal waste. Untreated stormwater runoff degrades water quality in surface waters and groundwater and can affect drinking water, human health, and plant and animal habitats.

Clearing, grading, excavation, and construction activities associated with buildout of the General Plan may impact water quality due to sheet erosion of exposed soils and subsequent deposition of particulates in local drainages. Grading activities lead to exposed areas of loose soil and sediment stockpiles that are susceptible to uncontrolled sheet flow. Both State and local regulations effectively mitigate construction stormwater runoff impacts from the buildout associated with the General Plan. The City of Corona's grading ordinance contains expanded requirements for grading, site erosion control, and NPDES requirements. In addition to existing regulations that control and minimize pollutants from construction activities, the General Plan includes several policies that ensure that new development minimizes potential water quality impacts.

Developments pursuant to the General Plan could potentially create new sources for runoff contamination through changing land uses. Consequently, implementation of the General Plan may have the potential to increase the post-construction pollutant loadings of certain constituent pollutants associated with the proposed land uses and their associated features. To help prevent long-term impacts associated with land use changes and in accordance with the requirements of the City of Corona’s Municipal Code Chapter 13.72, Local Implementation Plan (LIP), and the Riverside County MS4 permit, new development, and significant redevelopment projects must incorporate low impact development (LID)/site design and source control best management practices (BMPs) to address post-construction storm water runoff management. Furthermore, projects must develop a project-specific Water Quality Management Plan (WQMP) with BMPs, and adhere to the requirements of the amended trash total maximum daily load (TMDL).

With the implementation of federal, State, and local regulations runoff from both the operational and construction phases of development pursuant to the General Plan would not violate any water quality standards or waste discharge requirements, and impacts would be less than significant.

Ground Water Supplies
The Corona General Plan area relies on local groundwater resources for approximately 40 percent of its water supply. Therefore, increases in population could generate a higher demand for groundwater resources. The 2 Chapter 13.7 of the City’s Zoning Code, as referenced in the 2020 Certified EIR, have since been updated to Chapter 13.27 in the current Zoning Code as noted in the analysis provided below.

CITY PARK REVITALIZATION PROJECT EIR ADDENDUM

CITY OF CORONA

5. Environmental Analysis

Page 104 ends

2015 UWMP highlighted sufficient surface and underground water supplied through 2040 concluding no risk of a net deficit in aquifer volume or lowering of the groundwater table. The City prepared a groundwater management plan in 2008 to assist with sustainably operating the Temescal Basin, Bedford Basin, and Coldwater Basin and increasing the reliability of the water supply. Furthermore, the DWR released its final list of critically overdrafted basins in January 2016. The list did not include the Temescal Basin, the Coldwater Basin, or the Bedford Basin. The Temescal Basin and Coldwater Basin are managed to prevent critical overdraft. The City has implemented the Recharge Master Plan for the Temescal Basin, and projects are underway to increase the volume of tertiary-treated reclaimed water available for recharge and to increase the number and capacity of recharge basins. According to the Recharge Master Plan, the Temescal Basin is currently in overdraft; however, the rate of overdraft is decreasing as a result of plan implementation. With the implementation of federal, State, and local regulations (policies of the General Plan), buildout of the General Plan would not decrease groundwater supplies or interfere substantially with groundwater recharge, and impacts would be less than significant.

Erosion and Runoff
Development within the General Plan area and the change in land uses would result in an increase in impervious surfaces. This could result in an increase in stormwater runoff, higher peak discharges to drainage channels, and the potential to cause erosion or sedimentation in drainage swales and streams. Drainage patterns will largely be maintained and will utilize the existing drainage facilities within the public right-of-way in the City and SOI and is eventually discharged into the Santa Ana River. The 2003 update of the City of Corona Drainage Master Plan identified a number of deficient segments throughout the City’s service area that were marked for improvement. However, the City is monitoring the drain system for future improvements and will be updating its Drainage Master Plan to adequately plan for future drainage needs, especially within the remaining undeveloped areas. The overall drainage patterns, flow rates, and flow volumes will be maintained based on the high level of impervious surfaces under existing conditions and will not increase the opportunity for erosion or scour downstream. Hydromodification requirements and standard flood control requirements for new development will minimize impacts of increased flows and volumes on downstream receiving waters.

Implementation of the proposed land use changes within undeveloped areas will likely result in increased runoff, but discharges will be required be consistent with the parameters defined by the most current Master Plan of Drainage or site-specific watershed study. Standard erosion control measures would be implemented as part of the SWPPP for any proposed project to minimize the risk of erosion or sedimentation during construction. The SWPPP must include an erosion control plan that prescribes measures such as phasing grading, limiting areas of disturbance, designating restricted-entry zones, diverting runoff from disturbed areas, protective measures for sensitive areas, outlet protection, and provisions for revegetation or mulching. With the implementation of federal, State, and local regulations, and the policies of the General Plan, would ensure erosion, siltation, or polluted runoff impacts would be less than significant.

Flood Flows
The City is within the dam inundation zones of the Prado, Mabey Canyon, Harrison Street, Lee Lake, Lake Mathews, and Mockingbird Canyon dams. The probability of dam failure is extremely low, and the City of Corona has never been impacted by a major dam failure. Dams in California are continually monitored and inspected by various governmental agencies, including the California Division of Safety of Dams. Dam owners

CITY PARK REVIT A LIZATION PROJECT EIR ADDENDUM

CITY OF CORONA

5. Environmental Analysis
June 2026 Page 105
are required to maintain Emergency Action Plans (EAPs) that include procedures for damage assessment and emergency warnings, and the County addresses the possibility of dam failure in the Safety Element of its General Plan.

Additionally, areas of the City are within a 100-year flood zone. All new developments would be required to meet federal floodplain regulations, including that the lowest floor of the structure is raised above the 100-year base flood elevation. Furthermore, the City’s Municipal Code Title 18, Floodplain Management, minimizes public and private losses due to flood conditions in specific areas by restricting or prohibiting uses that result in damaging increases in flood heights or velocities. With the implementation of these policies, in addition to federal, state, and local regulations, future development pursuant to the General Plan would not impede or redirect flood flows, and impacts would be less than significant.

Flood Hazards
With the implementation of General Plan policies and federal, State, and local regulations, future development pursuant to the General Plan would not release pollutants due to inundation, and impacts would be less than significant.

Released water from a seiche would result in much smaller footprints than the dam inundation zones, and the probability of this occurring is extremely low. In the rare chance that a seiche does occur, the seiche would flow into the dam inundation zones. However, with implementation of General Plan policies and federal, State, and local regulations, impacts would be less than significant.

The General Plan area is more than 30 miles from the Pacific Ocean, well outside of the tsunami inundation zone. No impacts would arise from tsunamis.

Water Quality Control Plan or Sustainable Groundwater Management Plan Specific measures for surface and groundwater quality were previously outlined and are in place to ensure future development has a less than significant. General Plan regulations and policies ensure that future development does not obstruct or conflict with the Corona Groundwater Management Plan. In addition, the goals and policies in the General Plan would ensure that the City would not obstruct with implementation of the watershed action plan for the Santa Ana Watershed Region of Riverside County, the Recharge Master Plan for the Temescal Basin, or the Corona Groundwater Management Plan. Therefore, buildout of the General Plan would not obstruct or conflict with the implementation of a water quality control plan or a sustainable groundwater management plan and impacts would be less than significant.

CITY PARK REVITALIZATION PROJECT EIR ADDENDUM

CITY OF CORONA

5. Environmental Analysis

Page 106 ends

5.10.2 Impacts Associated with the Proposed Project
Would the project:

Environmental Issues
Condition 1:

Substantial
Change in
Project
Requiring
Major
Revisions
Condition 2:

Substantial
Change in
Circumstances
Requiring
Major
Revisions
Condition 3:

New
Information
Showing New
or Increased
Significant
Effects
Less Than
Significant
Impact/No
Changes or
New
Information
Requiring
Preparation of
an EIR/MND No Impact
a) Violate any water quality standards or waste
discharge requirements or otherwise
substantially degrade surface or
groundwater quality?
X
b) Substantially decrease groundwater
supplies or interfere substantially with
groundwater recharge such that the project
may impede sustainable groundwater
management of the basin?
X
c) Substantially alter the existing drainage
pattern of the site or area, including through
the alteration of the course of a stream or
river or through the addition of impervious
surfaces, in a manner which would:
i) result in substantial erosion or siltation
on- or off-site; X
ii) substantially increase the rate or
amount of surface runoff in a manner
which would result in flooding on- or
off-site;
X
iii) create or contribute runoff water which
would exceed the capacity of existing
or planned stormwater drainage
systems or provide substantial
additional sources of polluted runoff;
or
X
iv) impede or redirect flood flows? X
d) In flood hazard, tsunami, or seiche zones,
risk release of pollutants due to project
inundation?
X
e) Conflict with or obstruct implementation of a
water quality control plan or sustainable
groundwater management plan?
X
a) Violate any water quality standards or waste discharge requirements or otherwise substantially degrade surface or groundwater quality?
Less Than Significant Impact/No Changes or New Information Requiring Preparation of an EIR/MND. Urban runoff from storms or nuisance flows (runoff during dry periods) from development

CITY PARK REVIT A LIZATION PROJECT EIR ADDENDUM

CITY OF CORONA

5. Environmental Analysis
June 2026 Page 107
projects can carry pollutants to receiving waters. Runoff can contain pollutants such as oil, fertilizers, pesticides, trash, and sediment. This runoff can flow directly into local streams or storm drains and continue through pipes until it is released untreated into a local waterway and eventually the ocean. Untreated stormwater runoff degrades water quality in surface waters and groundwater and can affect drinking water, human health, and plant and animal habitats. The construction and operational phases of the proposed project could have the potential to impact water quality. The following is a discussion of the potential impacts that the construction and operational phases of the proposed project could have on water resources and quality.

Construction
Clearing, grading, excavation, and construction activities associated with the proposed project may impact water quality through soil erosion and increasing the amount of silt and debris carried in runoff. Additionally, the use of construction materials such as fuels, solvents, and paints may present a risk to surface water quality. Finally, the refueling and parking of construction vehicles and other equipment on-site during construction may result in oil, grease, or related pollutant leaks and spills that may discharge into the storm drain system.

The proposed project would be required to comply with all applicable regulatory requirements governing water quality. The proposed project would be required to comply with the National Pollutant Discharge Elimination System Construction General Permit (CGP) (2022-0057-DWQ). The CGP requires the preparation of a Stormwater Pollution Prevention Plan (SWPPP) that incorporates BMPs to control sedimentation, erosion, and hazardous materials contamination of runoff during construction. The State Water Resource Control Board (SWRCB) mandates that projects that disturb one or more acres of land must obtain coverage under the Statewide CGP. Prior to the start of construction activities, the project applicant must file Permit Registration Documents (PRDs) with the SWRCB, which includes a Notice of Intent, risk assessment, site map, annual fee, signed certification statement, SWPPP, and post-construction water balance calculations. The construction contractor is required to maintain a copy of the SWPPP on-site at all times and implement all construction BMPs identified in the SWPPP during construction activities. Prior to the issuance of a grading permit, the project applicant is required to provide proof of filing of the PRDs with the SWRCB, which includes preparation of SWPPP.

The SWPPP must describe construction BMPs that address pollutant source reduction and provide measures/controls to mitigate potential pollutant sources. Which includes, but is not limited to erosion controls, sediment controls, tracking controls, non-storm water management, materials and waste management, and good housekeeping practices. Submittal of the PRDs and implementation of the SWPPP and its associated BMPs throughout the construction phase would result in an impact of less than significant. Accordingly, no new significant impacts or impacts of greater severity than those identified in the 2020 Certified EIR would occur. No changes or new information would require preparation of a supplemental or subsequent EIR.

Operation
Once the proposed project has been constructed, urban runoff could include a variety of contaminants that are typical of the operation of park facilities and could impact water quality. As discussed in Section 5.9.2(b), above, the proposed project would be required to comply with applicable federal and state laws and regulations

CITY PARK REVITALIZATION PROJECT EIR ADDENDUM

CITY OF CORONA

5. Environmental Analysis

Page 108 ends

governing the use, storage, transport, and disposal of hazardous materials would ensure impacts would be less than significant.

Further, the proposed project would implement BMPs to control and amount and quality of the stormwater leaving the project site, and the proposed project would not violate any water quality standards or waste discharge requirements or otherwise substantially degrade surface or ground water quality. Thus, impacts would be less than significant. Accordingly, no new significant impacts or impacts of greater severity than those identified in the 2020 Certified EIR would occur. No changes or new information would require preparation of a supplemental or subsequent EIR.
b) Substantially decrease groundwater supplies or interfere substantially with groundwater recharge such that the project may impede sustainable groundwater management of the basin? Less Than Significant Impact/No Changes or New Information Requiring Preparation of an EIR/MND. The project site is located within the Upper Santa Ana Valley–Temescal Groundwater Subbasin, with a total of 23,500 acres (CDWR 2024b; Corona 2021). According to the City of Corona Urban Water Management Plan, the city relies on groundwater for approximately 50 percent of its potable water supplies by natural and artificial means (Corona 2021). The main source of recharge for the groundwater reservoir is the tributaries existing in the surrounding mountains and hillsides, thus urban areas which include the project site are not high priority recharge areas.

The project site is already developed, and contains impervious and pervious surfaces, and runoff from the proposed project would go directly into the ground or to the storm drains along the streets that bound the project site: Quarry Street, East 6th Street, East Gran Boulevard, and Rimpau Avenue. The project site is not used for groundwater recharge activities or extraction. The proposed project would result in approximately 215,640 square feet of new impervious surfaces on the project site with the construction of a new community center, aquatics center, parking lot, driveways, and walkways. The proposed project site would increase the total amount of impervious surfaces in the Temescal Groundwater Subbasin by less than 1 percent, which would be a minor increase in impervious services to the basin.3 As discussed in 5.10.2(a), the proposed project would be required to comply with all applicable regulations governing water quality and use, including General Plan Policy U-5.1. Therefore, the slight increase of impervious surfaces on the project site would not substantially decrease groundwater supplies nor interfere with groundwater recharge. Thus, impacts would be less than significant. Accordingly, no new significant impacts or impacts of greater severity than those identified in the 2020 Certified EIR would occur. No changes or new information would require preparation of a supplemental or subsequent EIR.
3 1 sq ft. = .0000229 ac
215,640 sq ft. = 4.95
(4.95 ac project site ÷ 23,500 ac ) 10 0= 0.02 percent

CITY PARK REVIT A LIZATION PROJECT EIR ADDENDUM

CITY OF CORONA

5. Environmental Analysis
June 2026 Page 109
c) Substantially alter the existing drainage pattern of the site or area, including through the alteration of the course of a stream or river or through the addition of impervious surfaces, in a manner which would:
i) Result in a substantial erosion or siltation on- or off-site? Less Than Significant Impact/No Changes or New Information Requiring Preparation of an EIR/MND. Erosion and siltation impacts that could result from alteration of drainage patterns would, for the most part, occur during the proposed project’s construction phase, which would include site preparation and grading activities. Environmental factors that affect erosion include topography, soil type, wind, and rainfall. Siltation is associated with sediment transport and deposition in waterways. Because the project would disturb more than one acre of land, the City would be required to prepare and implement a SWPPP under the requirements of the GCP issued by the SWRCB. The SWPPP would specify BMPs for reducing or eliminating soil erosion from the site during project construction and operation. Erosion control measures implemented as part of BMPs may include the placement of sandbags around basins; use of proper grading techniques; appropriate sloping, shoring, and bracing of the construction site; using mulch, geotextiles, hydroseeding, swales, and earth dikes; and covering topsoil stockpiles.

The proposed project would not involve the alteration of any natural drainage channels or any watercourse.

The project’s Preliminary WQMP includes BMPs that would minimize erosion or siltation on- or off-site during the operational phase of the proposed project. These BMPs would preserve the existing drainage patterns by directing flow to the same pre-development off-site discharge locations; disconnecting impervious areas and diverting runoff into self-treating landscaping or proprietary biotreatment BMPs; implementing water-efficient landscaping; protecting slopes to reduce the risk of scouring; and revegetating disturbed areas.

The SWPPP would describe the BMPs to reduce the impact of erosion and siltation to less than significant.

Accordingly, no new significant impacts or impacts of greater severity than those identified in the 2020 Certified EIR would occur. No changes or new information would require preparation of a supplemental or subsequent EIR.
ii) Substantially increase the rate or amount of surface runoff in a manner which would result in flooding on- or offsite?
Less Than Significant Impact/No Changes or New Information Requiring Preparation of an EIR/MND. The project site is built out with hardscape, park play fields, and associated structures.

Furthermore, the proposed project would not involve the alteration of any natural drainage or watercourse.

As discussed above, the proposed project would only result in a minor increase of impervious surfaces on the project site. Thus, the amount of stormwater runoff reaching the City’s storm drain system would be similar to existing conditions. The proposed project would not substantially increase the rate or amount of surface runoff in a manner that would cause flooding on or off site. The proposed project would comply with city policies, including Policy IU-2.9, which requires that grading plans be designed and implemented to reduce stormwater runoff by capturing rainwater on-site and storing it on a temporary, short-term basis to facilitate groundwater recharge rather than relying solely on community drainage facilities. Therefore,

CITY PARK REVITALIZATION PROJECT EIR ADDENDUM

CITY OF CORONA

5. Environmental Analysis

Page 110 ends

impacts related to stormwater drainage and flooding would be less than significant. Accordingly, no new significant impacts or impacts of greater severity than those identified in the 2020 Certified EIR would occur. No changes or new information would require preparation of a supplemental or subsequent EIR. iii) Create or contribute runoff water which would exceed the capacity of existing or planned stormwater drainage systems or provide substantial additional sources of polluted runoff? Less Than Significant Impact/No Changes or New Information Requiring Preparation of an EIR/MND. The project site is built out with hardscape, park play fields, and associated structures. The stormwater from the proposed project would be conveyed to existing stormwater drains or to the storm drain system along roadways and to the storm drain channel/Temescal Wash approximately 0.10 miles northeast. Thus, the amount of stormwater runoff reaching the City’s storm drain system would be similar to existing conditions. The proposed project would not substantially increase the rate or amount of surface runoff in a manner that would cause flooding on- or off-site. The proposed project would not involve the alteration of any natural drainage or watercourse. As discussed above, the proposed project would only result in a minor increase of impervious surfaces on the project site. Additionally, BMPs specified in the WQMP would further decrease peak flows. Post-development runoff from the project site would not exceed the capacity of existing or planned stormwater drainage systems or substantially alter the existing drainage pattern of the project site or area in a manner that would result in flooding on- or offsite.

Therefore, impacts would be less than significant. Accordingly, no new significant impacts or impacts of greater severity than those identified in the 2020 Certified EIR would occur. No changes or new information would require preparation of a supplemental or subsequent EIR. iv) Impede or redirect flood flows?
Less Than Significant Impact/No Changes or New Information Requiring Preparation of an EIR/MND. The project site is not in a Federal Emergency Management Agency 100-year flood hazard zone (FEMA 2008). The project site is within Zone X, defined as an area within a 500-year flood hazard zone, an area with a 0.2 percent annual chance of flood hazard or areas with a 1 percent annual chance of flood with an average depth of less than one foot (FEMA 2009).

Additionally, portions of the project site, specifically to the north and east are within the inundation zone of the Mathews Dam (CDWR 2024). The dam is owned and maintained by the Metropolitan Water District of Southern California. Dams in California are monitored and inspected annually by the California Division of Safety of Dams. In addition, dam owners are required to maintain emergency action plans (EAP) that include procedures for damage assessment and emergency warnings. An EAP identifies potential emergency conditions at a dam and specifies preplanned actions to help minimize property damage and loss of life should those conditions occur. EAPs contain procedures and information that instruct dam owners to issue early warning and notification messages to downstream emergency management authorities. Additionally, the State of California Dam Safety Act requires dam owners to submit inundation maps for dams whose total failure would cause loss of life or personal injury.

Therefore, the proposed project would not impede or redirect flood flows and impacts would be less than significant. Accordingly, no new significant impacts or impacts of greater severity than those identified in

CITY PARK REVIT A LIZATION PROJECT EIR ADDENDUM

CITY OF CORONA

5. Environmental Analysis
June 2026 Page 111
the 2020 Certified EIR would occur. No changes or new information would require preparation of a supplemental or subsequent EIR.
d) In flood hazard, tsunami, or seiche zones, risk release of pollutants due to project inundation? Less Than Significant Impact/No Changes or New Information Requiring Preparation of an EIR/MND. As discussed in Section 5.10.2(c)(iv), the project site is not in a 100-year flood zone but is located in the dam inundation zone of Mathew Canyon Dam. However, impacts from dam failure would be less than significant, as discussed in Section 5.10(c)(iv).

A seiche is an oscillating surface wave in a restricted or enclosed body of water, generated by ground motion, usually during an earthquake. Seiches are of concern for water storage facilities such as reservoirs, water storage tanks, dams, or other artificial bodies of water because a seiche can cause sloshing and an overflow of water from the water body. There are no adjacent bodies of water that would pose a flood hazard to the site due to a seiche and, therefore, the project site is not at risk of inundation by seiche.

Tsunamis are a type of earthquake-induced flooding produced by large-scale sudden disturbances of the sea floor. Tsunami waves interact with the shallow sea floor when approaching a landmass, resulting in an increase in wave height and a destructive wave surge into low-lying coastal areas. The project site is approximately 32 miles inland from the Pacific Ocean. Therefore, the site is outside the tsunami hazard zone and would not be affected by a tsunami.

Based on the preceding, the proposed project would not result in the release of pollutants as a result of floods, tsunamis, or seiche. Therefore, impacts would be less than significant. Accordingly, no new significant impacts or impacts of greater severity than those identified in the 2020 Certified EIR would occur. No changes or new information would require preparation of a supplemental or subsequent EIR. e) Conflict with or obstruct implementation of a water quality control plan or sustainable groundwater management plan?
Less Than Significant Impact/No Changes or New Information Requiring Preparation of an EIR/MND. Water quality in Corona is regulated by the Santa Ana RWQCB and its Basin Plan for the Santa Ana River. The basin plan contains water quality standards and identifies beneficial uses (wildlife habitat, agricultural supply, fishing, etc.) for receiving waters along with water quality criteria and standards necessary to support these uses consistent with federal and state water quality laws. The Basin Plan also contains water quality criteria for groundwater. The proposed project would not conflict or obstruct the implementation of a water quality control plan or a sustainable groundwater management plan. Project construction would be subject to the Statewide CGP and implementation of BMPs specified in the SWPPP. This would minimize the potential for erosion or siltation impacts to occur that could impact receiving waters. Therefore, the proposed project would comply with the Basin Plan.

Additionally, the project site is in the Upper Santa Ana Valley–Temescal Groundwater Subbasin. The groundwater basin is categorized as a medium priority basin by the Sustainable Groundwater Management Act Basin Prioritization Dashboard (CDWR 2024a). The latest Groundwater Sustainability Plan for the Temescal

CITY PARK REVITALIZATION PROJECT EIR ADDENDUM

CITY OF CORONA

5. Environmental Analysis

Page 112 ends

Basin was published in January 2022. As discussed in Sections 5.10.2(a) and (b) above, the project would not decrease groundwater supplies or interfere substantially with groundwater recharge. Therefore, the proposed project would not conflict with or obstruct implementation of the Groundwater Sustainability Plan for the Temescal Basin. Therefore, as with the Approved Project, a less than significant impact would occur the proposed project. Accordingly, no new significant impacts or impacts of greater severity than those identified in the 2020 Certified EIR would occur. No changes or new information would require preparation of a supplemental or subsequent EIR.

5.10.3 Adopted Mitigation Measures Applicable to the Proposed Project No mitigation measures related to hydrology and water quality were outlined in the 2020 Certified EIR.

CITY PARK REVIT A LIZATION PROJECT EIR ADDENDUM

CITY OF CORONA

5. Environmental Analysis
June 2026 Page 113

5.11 LAND USE AND PLANNING

5.11.1 Summary of Impacts Identified in the Program EIR The 2020 Certified EIR concluded that no mitigation measures were feasible, and the Approved Project would result in significant impacts related to land use and planning.

Divide an Established Community
The proposed General Plan would improve connectivity and compatibility of potential future projects with existing uses, planned uses, the natural environment, and the City’s SOI. The Circulation Element of the General Plan provides policies designed to ensure the prevention of communities, as a result of the construction of new or modified roadways. The General Plan would not physically divide any of these communities; rather, the Approved Project seeks to maintain and preserve the quality of Corona’s existing communities.

Conflict with a Land Use Plan
The General Plan is intended to shape development within the City for subsequent years. The Approved Project is consistent with California Code Section 65302 and the required elements outlined in the OPR general plan guidelines. Each of the specific applicable requirements in state planning law (California Government Code Section 65300) were examined to determine if there were environmental issues within the community that the Approved Project should address, including hazards and flooding. Such environmental issues (air quality, hazards, flooding, traffic, etc.) are addressed in their respective elements of the General Plan. Additionally, the General Plan was determined to be consistent with SCAG’s 2016–2040 Regional Transportation Plan/Sustainable Communities Strategy goals.

Airport operations and their accompanying noise and safety hazards require careful land-use planning on adjacent and nearby lands to protect the residential and business communities in Corona from the potential hazards that could be created by airport operations. Pursuant to California Public Utilities Code Section 21676, local governments are required to submit all general plan and zoning amendments that occur in the ALUC planning areas for consistency review by ALUC. The Approved Project would not result in changes to land use designations, density, or intensity levels compared to the 2004 General Plan. Although there are no inconsistencies in the Approved Project, the 2004 General Plan was previously identified by the ALUC as conflicting with the Airport Land Use Compatibility Plan (ALUCP). As a result, the ALUC might identify inconsistencies between the Approved Project and the ALUCP. Although the City determined the Approved Project was consistent with ALUCP and Caltrans health and safety standards, at the time of drafting the 2020 Certified EIR the project had not yet been before the ALUC for a determination of consistency. Thus, this impact was conservatively considered significant and unavoidable.

CITY PARK REVITALIZATION PROJECT EIR ADDENDUM

CITY OF CORONA

5. Environmental Analysis

Page 114 ends

5.11.2 Impacts Associated with the Proposed Project
Would the project:

Environmental Issues
Condition 1:

Substantial
Change in
Project
Requiring
Major
Revisions
Condition 2:

Substantial
Change in
Circumstances
Requiring
Major
Revisions
Condition 3:

New
Information
Showing New
or Increased
Significant
Effects
Less Than
Significant
Impact/No
Changes or
New
Information
Requiring
Preparation of
an EIR/MND No Impact
a) Physically divide an established
community? X
b) Cause a significant environmental impact
due to a conflict with any land use plan,
policy, or regulation adopted for the purpose
of avoiding or mitigating an environmental
effect?
X
a) Physically divide an established community?
No Impact. The project site and surrounding area are fully developed with urban land uses, such as residential and commercial land uses. The proposed project would occur within the same boundaries analyzed in the 2020 Certified EIR for the Approved Project. The proposed project would redevelop the existing park with a new community center, sports facilities, aquatics center and pool, play fields, a skate area, a splash pad, a stage and screen area for community events and market/vender spaces, and ornamental landscaping. The proposed improvements would be consistent with General Plan Policies LU 1.1, 5.5, 5.8, and 15.1; improvements would be limited to the park boundaries. The proposed project would not create any new land use barriers and would not divide or disrupt the physical arrangement of surrounding communities. Therefore, as with the Approved Project, a less than significant impact would occur under the proposed project. Accordingly, no new significant impacts or impacts of greater severity than those identified in the 2020 Certified EIR would occur. No changes or new information would require preparation of a supplemental or subsequent EIR. b) Cause a significant environmental impact due to a conflict with any land use plan, policy, or regulation adopted for the purpose of avoiding or mitigating an environmental effect? No Impact. The proposed project would be consistent with the existing park uses of the project site. The project site has a zoning designation of Parks (P) and a land use designation of Parks and Open Space Recreational (OS-R) (Corona 2024a). The proposed project would not alter or modify the project site’s current land use and zoning designations. Development of the proposed project would not conflict with any applicable land use plans, policies or regulations. Therefore, as with the Approved Project, a less than significant impact would occur under the proposed project. Accordingly, no new significant impacts or impacts of greater severity than those identified in the 2020 Certified EIR would occur. No changes or new information would require preparation of a supplemental or subsequent EIR.

CITY PARK REVIT A LIZATION PROJECT EIR ADDENDUM

CITY OF CORONA

5. Environmental Analysis
June 2026 Page 115

5.11.3 Adopted Mitigation Measures Applicable to the Proposed Project No mitigation measures related to land use and planning were outlined in the 2020 Certified EIR.

CITY PARK REVITALIZATION PROJECT EIR ADDENDUM

CITY OF CORONA

5. Environmental Analysis

Page 116 ends

5.12 MINERAL RESOURCES

5.12.1 Summary of Impacts Identified in the Program EIR The 2020 Certified EIR concluded that, even after the implementation of mitigation measures, the Approved Project resulted in significant impacts to mineral resources.

The City is primarily underlain by MRZ-2 lands, that is, areas where adequate information indicates that significant mineral deposits are present or there is a high likelihood of their presence. MRZ-2 lands with significant mineral deposits are designated by the California State Mining and Geology Board as of regional (multi-community) or statewide economic significance. The City of Corona does not contain mineral resources of local significance. In the City of Corona, mineral resource use must have a Mineral Resource (MR) Overlay, which requires a discretionary permit approved by the City Council. Implementation of the General Plan would result in residential and non-residential development that would preclude the extraction of approximately 100 acres of industrial minerals and 325 acres of construction aggregate in the City and SOI. The 2020 Certified EIR identified mitigation measures MIN-1 and MIN-2, however, buildout of the General Plan would result in a loss of available mineral resources in the City and SOI, a significant and unavoidable impact.

5.12.2 Impacts Associated with the Proposed Project
Would the project:

Environmental Issues
Condition 1:

Substantial
Change in
Project
Requiring
Major
Revisions
Condition 2:

Substantial
Change in
Circumstances
Requiring
Major
Revisions
Condition 3:

New
Information
Showing New
or Increased
Significant
Effects
Less Than
Significant
Impact/No
Changes or
New
Information
Requiring
Preparation of
an EIR/MND No Impact
a) Result in the loss of availability of a known
mineral resource that would be a value to
the region and the residents of the state?
X
b) Result in the loss of availability of a locally
important mineral resource recovery site
delineated on a local general plan, specific
plan or other land use plan?
X
a) Result in the loss of availability of a known mineral resource that would be a value to the region and the residents of the state?
No Impact. According to the California Department of Conservation’s Mineral Land Classification maps, the proposed project site is in MRZ-3, that is, an area containing mineral deposits whose significance cannot be evaluated from available data (CDC 1981). The closest mine in MRZ-2 is approximately 2 miles southeast of the project site (DOC 2024d). MRZ-2 are areas with adequate information indicating significant mineral deposits are present or where it is judged that a high likelihood for their presence exists (CDC 1981). The

CITY PARK REVIT A LIZATION PROJECT EIR ADDENDUM

CITY OF CORONA

5. Environmental Analysis
June 2026 Page 117
project site is developed and used as a park. No mining activities currently exist on the project site or in immediate vicinity, and the project site is surrounded by urban development. Construction and operation of the proposed project would not interfere with the availability of known mineral resources, since the project site is not in an MRZ-1 or MRZ-2 and no mining activities exist on-site or in the vicinity of the project site.

Therefore, the proposed project would not result in the loss of availability of a known mineral resource valuable to the region and the state. Therefore, as with the Approved Project, a less than significant impact would occur under the proposed project. Accordingly, no new significant impacts or impacts of greater severity than those identified in the 2020 Certified EIR would occur. No changes or new information would require preparation of a supplemental or subsequent EIR.
b) Result in the loss of availability of a locally important mineral resource recovery site delineated on a local general plan, specific plan or other land use plan? No Impact. Based on the Mineral Land Classification map, the project site is within MRZ-3, which are areas containing mineral deposits the significance of which cannot be evaluated from available data (CDC 1981). The project site is developed and used as a park. No mining activities currently exist on the project site or in the immediate vicinity, as the project site is surrounded by urban development. Construction and operation of the proposed project would not interfere with the availability of known mineral resources, since the project site is not in an MRZ-1 or MRZ-2, and no mining activities exist on-site. Therefore, the proposed project would not result in the loss of availability of a locally important mineral resource delineated on a local plan. Accordingly, no new significant impacts or impacts of greater severity than those identified in the 2020 Certified EIR would occur. No changes or new information would require preparation of a supplemental or subsequent EIR.

5.12.3 Adopted Mitigation Measures Applicable to the Proposed Project The following mitigation measures were taken directly from the 2020 Certified EIR; however, none of the measures are applicable to the proposed project.

MIN-1 Prior to project approval for proposed development of properties classified as either regionally significant construction aggregate MRZ-2 or industrial minerals MRZ-2a, a mineral resource evaluation shall be conducted to determine the significance and economic viability of mining the resource. If development of a property would preclude future extraction of a significant mineral resource, in accordance with CEQA, the City shall make the appropriate findings and adopt a Statement of Overriding Considerations prior to permitting development of the property.

MIN-2 Prior to approval of any project on lands classified as either regionally significant construction aggregate MRZ-2 or industrial mineral MRZ-2a, a report shall be prepared that analyzes the project’s value in relation to the mineral values found onsite. The analysis shall consider the importance of construction aggregate mineral resource onsite to the market region as a whole, and not just the importance of the resources found within the City and SOI. The report shall be submitted to the City, such that the City has adequate information to develop a statement of reasons for permitting the proposed land use to the California Department of

CITY PARK REVITALIZATION PROJECT EIR ADDENDUM

CITY OF CORONA

5. Environmental Analysis

Page 118 ends

Conservation, State Mining and Geology Board, for subsequent review, in accordance with SMARA, Article 2, Section 2762 and 2763 for areas designated of regional significance.

CITY PARK REVIT A LIZATION PROJECT EIR ADDENDUM

CITY OF CORONA

5. Environmental Analysis
June 2026 Page 119

5.13 NOISE

5.13.1 Summary of Impacts Identified in the Program EIR The 2020 Certified EIR concluded that, even after the implementation of mitigation measures, the Approved Project resulted in significant impacts to noise.

Construction Noise. The 2020 Certified EIR determined that noise levels from grading and other construction activities for the approved project could range from 71 A-weighted decibels (dBA) to 89 dBA at the closest receptor locations within the planning area when construction occurs within 50 feet of receptors.

The approved project would be required to comply with the City’s noise ordinance construction hours of restriction. The 2020 Certified EIR concluded that construction noise impacts would be reduced with implementation of Mitigation Measure N-1, however, construction of the approved project would expose sensitive receptors to adverse noise impacts because of the potential for cumulative construction activities near sensitive uses, the number of construction projects occurring simultaneously, and the potential longevity of construction activities. Impacts would remain significant and unavoidable with the implementation of Mitigation Measure N-1.

Operational Noise (Mobile-Source). The 2020 Certified EIR determined that the roadway segments under the approved project would not contribute to a noise level increase above 3 dBA CNEL along the roadway segments studied for the General Plan Update. In addition,, the roadway segments under the conditions of the approved project would not contribute to a significant cumulative noise level increase as well. Therefore, the approved project would not have a significant adverse impact related to mobile sources.

Operational Noise (Stationary Source). The 2020 Certified EIR determined the approved project would be required to comply with City noise regulations, and that the approved project would not result in significant stationary noise impacts.

Vibration (Construction and Operation). The 2020 Certified EIR determined that the approved project would generate vibration levels of up to 0.05 inches per second root mean square (RMS) vertical velocity, or 94 VdB, when construction activities include pile driving within 25 feet of sensitive receptors. The approved project would be required to adhere to mitigation measures (N-2) and project design features in order to minimize potential construction equipment vibration impacts through compliance with regulatory code related to vibration and ensuring construction equipment operates at the maximum distance feasible from sensitive receptors. The Certified EIR concluded that vibration impacts would be less than significant with implementation of Mitigation Measures N-2.

5.13.2 Impacts Associated with the Proposed Project
Background noise fundamentals information, ambient noise measurement data, and the noise modeling results can be found in Appendix E.

CITY PARK REVITALIZATION PROJECT EIR ADDENDUM

CITY OF CORONA

5. Environmental Analysis

Page 120 ends

Ambient Noise Measurements
To determine baseline noise levels in the project vicinity, ambient noise monitoring was conducted by PlaceWorks on Thursday, May 16, 2024. Three short-term (15-minute) measurement locations were selected and conducted around the proposed project site. The short-term sound level meter used (Larson Davis LxT) for noise monitoring satisfies the American National Standards Institute (ANSI) standard for Type 1 instrumentation. The short-term sound level meter was set to “slow” response and “A” weighting (dBA). The meter was calibrated prior to and after each monitoring period. All measurements were at least 5 feet above the ground and away from reflective surfaces. Short-term measurement locations are described below and shown in Figure 9, Approximate Noise Monitoring Locations, and results are summarized in Table 9, Short-Term Noise Measurements Summary in A-weighted Sound Levels.

Table 9 Short-Term Noise Measurements Summary in A-weighted Sound Levels Monitoring
Location Description
15-minute Noise Level, dBA
Leq Lmax Lmin L50 L25 L8 L2
ST-1 At the westernmost basketball court near Quarry Street, across the residence at 1039 Quarry Street.

61.1 70.3 56.4 60.5 61.6 62.8 66.3
ST-2 At the center most driveway along East 6th street, across from 1020 East 6th Street.

69.8 78.9 57.1 68.6 71.2 73.5 75.3
ST-3 West of Rimpau Avenue, across the residence at 1108 East 5th Street.

63.1 75.1 55.3 59.2 62.6 68.0 71.0
ST-4 South of Quarry Street, adjacent to the residence at 902 Quarry Street.

61.1 72.1 53.1 58.0 61.1 65.5 68.6
Source: PlaceWorks 2024
See Appendix E.
 Short-Term Location 1 (ST-1) was conducted on the project sites westernmost basketball court, on the north side of the project site along Quarry Street across residence at 1039 Quarry Street. The 15-minute noise measurement began at 1:11 PM on Thursday, May 16, 2024. The noise environment is characterized by residential noise from Quarry Street. Noise levels measured 61.1 dBA Leq and 70.3 dBA Lmax during the measurement period at ST-1.
 Short-Term Location 2 (ST-2) was conducted at the centermost driveway, along East 6th Street across from 1020 East 6th Street. A 15-minute noise measurement began at 12:25 PM on Thursday, May 16, 2024.

The noise environment is characterized primarily by roadway noise on East 6th Street. Noise levels measured 69.8 dBA Leq and 78.9 dBA Lmax during the measurement period at ST-2.  Short-Term Location 3 (ST-3) was conducted at the western portion of the project site along Rimpau Avenue, across the residence at 1108 East 5th Street. A 15-minute noise measurement began at 12:50 PM on Thursday, May 16, 2024. The noise environment is characterized primarily by residential noise (i.e. cars, dogs barking, and birds) and industrial noises (i.e. angle grinder). Noise levels measured 63.1 dBA Leq and

75.1 dBA Lmax during the measurement period at ST-3.

PlaceWorks
Figure 9 - Approximate Noise Monitoring Locations
Source: Nearmap 2024.

CITY PARK REVITALIZATION PROJECT ADDENDUM
0 Scale (Feet)
360 Project Boundary
Residential
Commercial
Residential
Commercial
E 6th St
Quarry St
La Costa Dr
E 3rd St
Rimpau Ave
Arroya Ave
E Grand Ave
E 5th St
E 4th St
Margarita Dr
Circle City Dr
E 7th St
Filbert St
Spruce St
Pine St
Cedar St
Fullerton Ave
Park Ln
Portolla St
Gianni Dr
San Juan St
91 CALIFORNIA
Temescal Wash
Commercial
Commercial
Residential
ST-X Short-Term Noise Measurement Locations (4)
ST-4
ST-1
ST-2
ST-3

CITY OF CORONA

CITY PARK REVITALIZATION PROJECT EIR ADDENDUM

CITY OF CORONA

5. Environmental Analysis

Page 122 ends

This page intentionally left blank.

CITY PARK REVIT A LIZATION PROJECT EIR ADDENDUM

CITY OF CORONA

5. Environmental Analysis
June 2026 Page 123
 Short-Term Location 4 (ST-4) was conducted at the corner of 902 Quarry Street and the project site along the south side of Quarry Street. A 15-minute noise measurement began at 1:32 PM on Thursday, May 16, 2024. The noise environment is characterized primarily by residential noise (i.e. cars, dogs barking, and birds) and the distant train and freeway noise. Noise levels measured 61.1 dBA Leq and 72.1 dBA Lmax during the measurement period at ST-4.

Noise-Sensitive Receptors
Residential receptors are located to the north, across Quarry Street, to the east, across Rimpau Avenue, to the south, across East 6th Street, and to the west, at the corner of Quarry Street and Grand Boulevard and across Grand Boulevard.

Would the project result in:

Environmental Issues
Condition 1:

Substantial
Change in
Project
Requiring
Major
Revisions
Condition 2:

Substantial
Change in
Circumstances
Requiring
Major
Revisions
Condition 3:

New
Information
Showing New
or Increased
Significant
Effects
Less Than
Significant
Impact/No
Changes or
New
Information
Requiring
Preparation of
an EIR/MND No Impact
a) Generation of a substantial temporary or
permanent increase in ambient noise levels
in the vicinity of the project in excess of
standards established in the local general
plan or noise ordinance, or applicable
standards of other agencies?
X
b) Generation of excessive groundborne
vibration or groundborne noise levels? X
c) For a project located within the vicinity of a
private airstrip or an airport land use plan or,
where such a plan has not been adopted,
within two miles of a public airport or public
use airport, would the project expose people
residing or working in the project area to
excessive noise levels?
X
a) Generation of a substantial temporary or permanent increase in ambient noise levels in the vicinity of the project in excess of standards established in the local general plan or noise ordinance, or applicable standards of other agencies?
Less Than Significant Impact/No Changes or New Information Requiring Preparation of an EIR/MND. The 2020 Certified EIR stated that construction would occur near noise-sensitive receptors and found noise impacts potentially significant and unavoidable. The nearest receptors identified under the approved project were residences at approximately 50 feet or greater as measured from the center of the project site. Construction noise levels at the nearest receptors were estimated to range up to 89 dBA Lmax under the approved project.

CITY PARK REVITALIZATION PROJECT EIR ADDENDUM

CITY OF CORONA

5. Environmental Analysis

Page 124 ends

Noise generated by on-site construction equipment is based on the type of equipment used, its location relative to sensitive receptors, and the timing and duration of noise-generating activities. Each phase of construction involves different types of equipment and has distinct noise characteristics. Noise levels from construction activities are typically dominated by the loudest three pieces of equipment. The dominant equipment noise source is typically the engine, although work-piece noise (such as dropping of materials) can also be noticeable.

The expected construction equipment mix was estimated and categorized by construction activity using the Federal Highway Administration Roadway Construction Noise Model (RCNM). Average noise levels from project-related construction activities are calculated by modeling the three loudest pieces of equipment per activity phase. Equipment for grading and site preparation is modeled at spatially averaged distances (i.e., from the acoustical center of the general construction site to the property line of the nearest receptors) because the area around the center of construction activities best represents the potential average construction-related noise levels at the various sensitive receptors for mobile equipment. Building construction and architectural coating are measured from the edge of the proposed buildings to the nearest sensitive receptors. Additionally, paving is measured from the edge of the nearest paving areas to the nearest sensitive receptors. Results are summarized in Table 10, Project Related Construction Noise Levels (dBA), at the nearest receptors. Construction noise levels at a reference distance of 50 feet would range between 74 dBA and 84 dBA Leq throughout the construction period.

The nearest sensitive receptors under the proposed project include single-family homes, approximately 50 feet north, east, and west of the nearest project site paving areas. Construction equipment mix is anticipated to be similar to that of the Approved Project and include concrete saws, dozers, excavators, tractors, loaders, backhoes, excavators, graders, forklifts, generators, welders, air compressors, pavers and paving equipment, and rollers. These items were modeled using RCNM. The proposed project construction noise levels would range between 45 dBA to 77 dBA Leq at the nearest sensitive receptors throughout the construction phases.

Proposed project construction would not exceed the FTA 80 dBA Leq threshold at adjacent residential uses.

Additionally, proposed project construction would comply with the Corona Municipal Code 17.84.040(D)(2) Table 10 Project-Related Construction Noise Levels
Construction Activity Phase
Noise Levels in dBA Leq
RCNM Reference
Noise Level
Residential
Receptors to North
Residential
Receptors to East
Residential
Receptors to South
Residential
Receptors to West
Distance in feet 50 3601 2751 3401 2501
Site Preparation 82 65 67 65 68
Grading 84 67 69 67 70
Distance in feet 50 120 280 170 1340
Building Construction 81 73 66 70 52
Architectural Coating 74 66 59 63 45
Distance in feet 50 50 50 80 70
Paving 77 77 77 73 74
Exceeds FTA’s 80 dBA Leq Threshold? No No No No
Source: FHWA’s RCNM software.
dBA Leq = Energy-Average (Leq) Sound Levels. 1 Distanced were measured using Google Earth (2025) from the acoustical center of the project site.

CITY PARK REVIT A LIZATION PROJECT EIR ADDENDUM

CITY OF CORONA

5. Environmental Analysis
June 2026 Page 125
and no construction activities shall be undertaken between the hours of 8:00 p.m. and 7:00 a.m. Monday through Saturday and between the hours of 6:00 p.m. and 10:00 a.m. on Sundays and holidays. Therefore, the buildout of the proposed project would not result in a substantial increase in construction noise compared to what was analyzed in the 2020 Certified EIR.

The proposed project does not identify or require adoption of any further mitigation measures beyond those provided in the 2020 Certified EIR. The proposed project compared to the Approved Project would not result in any new impacts or increase the severity of impacts with respect to construction noise. Therefore, preparation of a supplemental or subsequent EIR is not required by CEQA.

Mobile-Source Noise Impacts
The proposed project would generate an increase in total daily trips compared to existing daily trips, specifically along (East 6th Street, Grand Boulevard, Quarry Street, Rimpau Avenue). A project will normally have a significant effect on the environment related to traffic noise if it substantially increases the ambient noise levels for adjoining areas. Most people can detect changes in sound levels of approximately 3 dBA under normal, quiet conditions, and changes of 1 to 3 dBA under quiet, controlled conditions. Changes of less than 1 dBA are usually indiscernible. A change of 5 dBA is readily discernible to most people in an outdoor environment.

Based on this, a significant impact would occur if project traffic noise increases of 1.5 dBA along East Grand Boulevard, Quarry Street, East Sixth Street, Rimpau Avenue, and Fullerton Avenue and increases of 3 dBA along East 3rd Street, relative to the existing noise environment.

Traffic noise increases are calculated using a version of the FHWA RD-77-108 Traffic Noise Prediction Model.

The traffic noise prediction model takes into account the following inputs: weekday and Saturday average daily traffic (ADT) volumes; vehicle mix; speeds; number of lanes; and day, evening, and night traffic splits. Model inputs associated with transportation noise were provided by Gibson (2026) (see Appendix E). Traffic noise modeling does not account for existing masonry walls at adjacent residential property lines. Table 11, Weekday Project-Related Increases in Traffic Noise, dBA CNEL at 50 Feet, shows that the addition of proposed project trips would result in an increase of up to 0.7 dBA over existing conditions and up to 0.6 over future weekday conditions.

CITY PARK REVITALIZATION PROJECT EIR ADDENDUM

CITY OF CORONA

5. Environmental Analysis

Page 126 ends

Table 11 Weekday Project-Related Increases in Traffic Noise, dBA CNEL at 50 Feet Roadway
Segment Traffic Noise Increase in dBA CNEL
From
To
Existing No
Project
Existing Plus
Project Increase
Future No
Project
Future Plus
Project Increase
East Grand
Boulevard
North of East Third Street 68.0 68.1 0.1 68.2 68.3 0.1
East 3rd Street West of East Grand Boulevard 58.7 58.9 0.2 59.6 59.8 0.2 Quarry Street East of East Grand Boulevard 62.1 62.7 0.7 62.3 63.0 0.6 East Grand
Boulevard
North of East Sixth Street 67.6 67.7 0.1 67.9 68.0 0.1
East Grand
Boulevard
South of East Sixth Street 66.4 66.5 0.2 66.8 66.9 0.1
East Sixth Street West of East Grand Boulevard 66.6 66.7 0.1 67.1 67.1 0.1 East Sixth Street East of East Grand Boulevard 70.0 70.1 0.1 70.3 70.3 0.1 East Sixth Street Between Kress Court & Rimpau
Avenue

71.1 71.1 0.0 71.3 71.3 0.0
East Sixth Street East of Rimpau Avenue 71.5 71.5 0.0 71.7 71.8 0.0 Rimpau Avenue North of East Sixth Street 62.2 62.7 0.5 62.5 63.0 0.5 Rimpau Avenue South of East Sixth Street 61.9 62.0 0.2 62.1 62.3 0.2 Fullerton Avenue South of East Grand Boulevard 65.4 65.6 0.1 65.9 66.0 0.1 Source: Project traffic based on Exhibit 7 of the Transportation Assessment for the Corona City Park Revitalization Project by Gibson (2026).

See Appendix E for modeling inputs and results.

Table 12, Saturday Project-Related Increases in Traffic Noise, dBA CNEL at 50 Feet, shows that the addition of proposed project trips would result in an increase of up to 0.8 dBA over existing conditions and up to 0.7 over future Saturday conditions.

Table 12 Saturday Project-Related Increases in Traffic Noise, dBA CNEL at 50 Feet Roadway
Segment Traffic Noise Increase in dBA CNEL
From To
Existing No
Project
Existing Plus
Project Increase
Future No
Project
Future Plus
Project Increase
East Grand
Boulevard
North of East Third Street 66.4 66.5 0.1 66.6 66.7 0.1
East 3rd Street West of East Grand Boulevard 56.9 57.1 0.2 58.2 58.4 0.1 Quarry Street East of East Grand Boulevard 59.7 60.5 0.8 60.0 60.7 0.7 East Grand
Boulevard
North of East Sixth Street 66.3 66.3 0.1 66.5 66.6 0.1
East Grand
Boulevard
South of East Sixth Street 65.0 65.2 0.1 65.5 65.6 0.1
East Sixth Street West of East Grand Boulevard 65.9 65.9 0.1 66.3 66.4 0.1 East Sixth Street East of East Grand Boulevard 68.9 69.0 0.1 69.2 69.3 0.1 East Sixth Street Between Kress Court & Rimpau
Avenue

70.1 70.0 0.0 70.3 70.3 0.0
East Sixth Street East of Rimpau Avenue 70.1 70.1 0.0 70.4 70.4 0.0 Rimpau Avenue North of East Sixth Street 64.6 64.9 0.2 64.9 65.1 0.2 Rimpau Avenue South of East Sixth Street 55.8 56.2 0.4 56.1 56.5 0.4

CITY PARK REVIT A LIZATION PROJECT EIR ADDENDUM

CITY OF CORONA

5. Environmental Analysis
June 2026 Page 127
Table 12 Saturday Project-Related Increases in Traffic Noise, dBA CNEL at 50 Feet Roadway
Segment Traffic Noise Increase in dBA CNEL
From To
Existing No
Project
Existing Plus
Project Increase
Future No
Project
Future Plus
Project Increase
Fullerton Avenue South of East Grand Boulevard 64.0 64.1 0.1 64.6 64.7 0.1 Source: Project traffic based on Exhibit 7 of the Transportation Assessment for the Corona City Park Revitalization Project by Gibson (2026).

See Appendix E for modeling inputs and results.

Existing land uses adjacent to the project site are developed with mixed uses and noise sensitive receptors that would be exposed to project traffic noise level increases. With the addition of proposed weekday and Saturday project traffic, traffic noise levels along 6th Street, Grand Boulevard, Quarry Street, Rimpau Avenue, 3rd Street and Fullerton Avenue project related traffic noise increases would be less than 1 dBA CNEL for weekdays and Saturday conditions at noise sensitive residential uses. Project traffic noise impacts would be less than significant. There would be no new significant impacts and no substantial increase in the severity of any previously identified significant impact in the General Plan EIR. No changes or new information would require preparation of a supplemental or subsequent EIR is not required by CEQA.

Amphitheater Noise
As discussed above, a change of 5 dBA is readily discernible in an exterior environment and a change in 10 dBA is perceived as a doubling in sound level. Based on this and noted that proposed project events (live music concerts and general outdoor festivals) would result in temporary periodic (not daily) increases in ambient noise levels from the proposed park events, a threshold of 10 dBA above the ambient is used. A noise increase above 10 dBA for periodic events (live music concerts and general outdoor festivals) would be considered a noise impact.

The proposed project would host a variety of events throughout the year in addition to weekly farmers market events. Outdoor amphitheater events would include a portable stage area for live music concerts and general outdoor festivals to host concerts and movies in the park events in the summer months. These live music events would be family-friendly in nature, taking into consideration that children under 13 years old are more noise sensitive because they have better hearing than adults, and would most likely preclude noise intensive rock band concerts. Rock band concerts can reach 100 dBA, where family friendly and classical music events typically range between 75 dBA and 95 dBA. Proposed music events would fall in the 75 dBA to 95 dBA range. Condition of Approval (COA) N-1, will be incorporated with the proposed project and stipulates that amphitheater sound system output would be restricted to an average of 90 dBA Leq, averaged over a 15-minute period, and instantaneous maximum noise levels of 95 dBA Lmax at a position located 100 feet from the portable stage area and portable movie screen of the park in addition to noise monitoring throughout live music events for appropriate sound system mixing board adjustments to ensure compliance with regulations.

A conservative approach for analyzing proposed live music events has been assumed for this analysis.

Amphitheater noise has been assessed with the 3D noise prediction model Cadna/A, an implementation of the ISO 9613 noise propagation calculation algorithms, with respect to events planned for the outdoor amphitheater that will be developed in the centrally located Community Canvas (RDWI 2025). The outdoor amphitheater is part of the renovation project that includes a portable stage area to be set up for live music

CITY PARK REVITALIZATION PROJECT EIR ADDENDUM

CITY OF CORONA

5. Environmental Analysis

Page 128 ends

concerts and general outdoor festivals. The Amphitheater noise modeling detailed below, includes the predicted noise impacts for two categories of events due to crowd and PA noise, showing noise contour results and numerical noise levels at the adjacent single-family and multi-family uses at the nearest building façades taking into account the proposed site design and off-site buildings. Spectral sound data for the concert was approximated based on data for a rock concert and applied to capture the potential effects of low frequency noise (i.e. bass). The spectrum adopted in the analysis is shown in Appendix G.

For live music concerts, a music noise level of 100 dBA (Leq, 15 min) evenly distributed over the audience area up to 100 ft from the stage (i.e. typical front of house mixing location) was assumed and derived from the World Health Organization Guidelines for Community Noise related to ceremonies, festivals and entertainment events. The source noise level was assumed to be evenly distributed over a semi-circular in the vicinity of the stage, resulting in noise levels ranging from 75 dBA to 80 dBA Leq, 15 min at the extents of the amphitheater clearing, where tree plantings surround the amphitheater grounds. For general outdoor festivals (including movies in the park, theatrical performances, announcements and background music), an audience area noise level of 80 dBA Leq, 15 min has been assumed for the full amphitheater area.

Exterior noise levels at adjacent land uses to the proposed project due to amphitheater activities are shown in Table 13, Project-Related Amphitheater Noise, dBA. Modeled noise contours are also shown in Appendix G. Noise levels at the nearest sensitive receptors during live rock music concerts are predicted to be in the range of 69 dBA to 77 dBA Leq, 15 min. Noise levels at the nearest sensitive receptors with implementation of COA N-1 are predicted to be in the range of 59 dBA to 71 dBA Leq, 15 min. Noise levels at the nearest sensitive receptors during general outdoor activities are predicted to range from 52 dBA to 59 dBA Leq, 15 min.

Table 13 Project-Related Amphitheater Noise, dBA
Receptor
Measure Ambient
Noise Level (dBA
Predicted Sound Levels at Sensitive
Receptors
COA N-1
Noise Limit 90
dBA Leq at
100 feet
Increase Over Ambient
Live Music Concerts
(dBA Leq, 15 min)
General Outdoor
Festivals
(dBA Leq, 15 min)
Live Music
Concerts
Increase Over
Ambient
General Outdoor
Festivals
Increase Over
Ambient
North 61 73 55 63-68 2-7 None
South-East 63 72 56 62-67 1-4 None
South 70 77 59 67-71 >1- 1 None
West 61 69 52 59-64 >1- 2 None
Source: RWDI (2025). See Appendix E.

As shown in Table 13, amphitheater noise during live music concerts, when implementing COA N-1 (maximum permissible noise levels and noise monitoring) would result in ambient noise level increases between >1 dBA to 7 dBA at adjacent noise sensitive uses to the project site. Amphitheater noise during general outdoor festivals (including movies in the park, theatrical performances, announcements and background music) would not result in ambient noise level increases at adjacent noise sensitive uses to the project site.

The proposed project noise levels attributable to live music concerts would result in a +7 dBA increase in ambient noise levels at noise sensitive residential receptors to the north of the project site. As discussed above,

CITY PARK REVIT A LIZATION PROJECT EIR ADDENDUM

CITY OF CORONA

5. Environmental Analysis
June 2026 Page 129
a noise increase of 10 dBA above existing ambient noise levels for periodic events (such as live music concerts) would be considered a significant impact, however compliance with COA N-1 would ensure impacts are less than significant.

Parking Lot Noise
The project includes 304 parking stalls or a net increase of 135 parking stalls from the existing 169 parking stalls;141 new parking stalls at the Main Parking Lot, located at corner of 6th Street and Rimpau Avenue; 63 parking stalls at the Quarry Street & West Parking Lot, 40 parking stalls in the West Quarry Parking Lot, and 60 parking stalls in the Kress Court Parking Lot. The residential receptors are located north of the project site, along Quarry Street; to east of the site along Rimpau Avenue; and to the west adjacent to the project site.

Parking Lot activities such as parking, loading and unloading of vehicles, entering and exiting the parking lot would occur for short periods of approximately 1 to 5 minutes consisting of vehicles idling, doors opening and closing, and voices. Based on measurements conducted from a previous project by PlaceWorks, the SEL associated with a parking event is typically 71 dB SEL at 50 feet. To quantify parking lot noise levels, a conservative approach of four (4) parking events per stall would occur within a peak hour. Assuming that each parking stall were to fill and empty (596 parking events total) during the peak hour, the noise level would be 63 dBA Leq at 50 feet from the center of the parking lot. The nearest residential property line is approximately 200 feet east from the center of the proposed parking lot, resulting in a parking lot noise level of 51 dBA Leq at the property line. The modeled new parking lot noise level would be 10 dBA less than the measured ambient noise level of 63 dBA Leq at noise monitoring site ST-3. The proposed project’s parking lot noise would comply with the City of Corona Code 17.84.040(C)(2) daytime standard of 55 dBA and would not substantial temporary or permanent increase in ambient noise levels in the vicinity of the project Therefore, parking lot noise impacts would be less than significant. Accordingly, no new significant impacts or impacts of greater severity than those identified in the 2020 Certified EIR would occur. No changes or new information would require preparation of a supplemental or subsequent EIR. b) Generation of excessive groundborne vibration or groundborne noise levels? Less Than Significant Impact/No Changes or New Information Requiring Preparation of an EIR/MND. Under the approved project, vibration impacts were found to be less than significant as the surrounding communities were not built out at the time of the approved project’s construction schedule.

However, under the proposed project, sensitive receptors within the surrounding communities are built out and occupied. Therefore, analysis of the proposed project is analyzed below evaluating vibration damage and annoyance at the nearby off-site sensitive receptors.

Potential vibration impacts associated with construction of projects are usually related to the use of heavy construction equipment during the demolition or grading phases of construction. Construction can generate varying degrees of ground vibration depending on the construction procedures and equipment. Construction equipment generates vibration that spreads through the ground and diminishes with distance from the source.

The effect on buildings in the vicinity of the construction site varies depending on soil type, ground strata, and receptor-building construction. The effects from vibration can range from no perceptible effects at the lowest vibration levels, to low rumbling sounds and perceptible vibrations at moderate levels, to slight structural

CITY PARK REVITALIZATION PROJECT EIR ADDENDUM

CITY OF CORONA

5. Environmental Analysis

Page 130 ends

damage at the highest levels. Vibration from construction activities rarely reaches the levels that can damage structures.

For reference, a peak particle velocity of 0.20 in/sec PPV is used as the limit for nonengineered timber and masonry buildings (which would apply to the off-site surrounding residential structures) (FTA 20184). The Certified EIR applied a 0.20 in/sec PPV residential threshold, in addition to Section 17.84.050 of the Corona Municipal Code threshold of vibration perception at no more than 0.05 inches per second root mean squared (RMS) vertical velocity (equivalent to 94 VdB5). Table 14, Vibration Impact Levels for Typical Construction Equipment, shows typical construction equipment reference vibration levels at a distance of 25 feet and vibration levels at adjacent receptors. The nearest construction activity would occur closest to the residences to the north of the project site. The closest buildings to the project site are 50 feet north and south of the nearest project construction activity area.

Table 14 Vibration Impact Levels for Typical Construction Equipment Equipment
Reference Levels at
25 Feet
Residential
Receptors to North at
50 feet
Residential
Receptors to South
at 50 feet
Residential
Receptors to East at
80 feet
Residential
Receptors to West at
70 feet
PPV
(in/sec) VdB
PPV
(in/sec) VdB
PPV
(in/sec) VdB
PPV
(in/sec) VdB
PPV
(in/sec) VdB
Vibratory Roller 0.21 94 0.074 85 0.074 85 0.037 79 0.045 81 Large Bulldozer 0.089 87 0.031 78 0.031 78 0.016 72 0.019 74 Hoe Ram 0.089 87 0.031 78 0.031 78 0.016 72 0.019 74
Loaded Trucks 0.076 86 0.027 77 0.027 77 0.013 71 0.016 73 Jackhammer 0.035 79 0.012 70 0.012 70 0.006 64 0.007 66 Small Bulldozer 0.003 58 0.001 49 0.001 49 0.001 43 0.001 45 Source: FTA 2018.

See Appendix E for modeling inputs and results.

Potential architectural impacts due to vibration are assessed from the edge of construction to the nearest offsite structure. No intensive vibration activity such as pile driving, or rock crushing is proposed in the proposed project. The equipment anticipated to induce the highest vibration is a vibratory roller for new pavement by the proposed building. Vibratory rollers generate vibration levels of 0.21 in/sec PPV at 25 feet.

The nearest sensitive receptors to project construction activities would be the residences to the north, south, and west at approximately 50 feet. The resulting vibration levels at these buildings due to construction vibration would be up to 0.074 in/sec PPV and 85 VdB. Project construction vibration levels would not exceed City criteria for human annoyance of 94 VdB and FTA threshold of 0.2 in/sec PPV at adjacent residential uses to the proposed project. Therefore, buildout of the proposed project would not result in a substantial increase in construction vibration compared to what was analyzed in the 2020 Certified EIR. 4 Federal Transit Administration (FTA). 2018, September. Transit Noise and Vibration Impact Assessment. 5 Lv = 20Log10(V/Vref) Lv = velocity level, VdB
V = rms velocity amplitude
Vref = .000001 in/sec

CITY PARK REVIT A LIZATION PROJECT EIR ADDENDUM

CITY OF CORONA

5. Environmental Analysis
June 2026 Page 131
The proposed project does not identify or require adoption of any further mitigation measures beyond those provided in the 2020 Certified EIR. Therefore, as with the Approved Project, a less than significant impact would occur under the proposed project. Accordingly, no new significant impacts or impacts of greater severity than those identified in the 2020 Certified EIR would occur. No changes or new information would require preparation of a supplemental or subsequent EIR.
c) For a project located within the vicinity of a private airstrip or an airport land use plan or, where such a plan has not been adopted, within two miles of a public airport or public use airport, would the project expose people residing or working in the project area to excessive noise levels? No Impact. The nearest airport to the approved project was the Corona Municipal Airport approximately 2.5 miles northwest of the project site. As stated in the approved project, the airport is not a substantial source of noise because the 65 dBA noise contour does not extend past the airport boundary. The proposed project would not expose people residing or working in the area to excessive noise levels. Therefore, as with the Approved Project, a less than significant impact would occur under the proposed project. Accordingly, no new significant impacts or impacts of greater severity than those identified in the 2020 Certified EIR would occur.

No changes or new information would require preparation of a supplemental or subsequent EIR.

5.13.1 Adopted Mitigation Measures Applicable to the Proposed Project The following mitigation measures were taken directly from the 2020 Certified EIR and would be incorporated as part of the proposed project; however, none of the measures are applicable to the proposed project.

N-1 Construction contractors shall implement the following measures for construction activities conducted in the City. Construction plans submitted to the City shall identify these measures on demolition, grading, and construction plans submitted to the City. The City Corona Public Works Department shall verify that grading, demolition, and/or construction plans submitted to the City include these notations prior to issuance of demolition, grading and/or building permits.
 During the active construction period, equipment and trucks used for project construction shall utilize the best available noise control techniques (e.g., improved mufflers, intake silencers, ducts, engine enclosures, and acoustically attenuating shields or shrouds), wherever feasible.
 Impact tools (e.g., jack hammers and hoe rams) shall be hydraulic- or electric-powered wherever feasible. Where the use of pneumatic tools is unavoidable, an exhaust muffler on the compressed air exhaust shall be used along with external noise jackets on the tools.  Stationary equipment such as generators and air compressors shall be located as far as feasible from noise-sensitive uses.
 Stockpiling shall be located as far as feasible from noise-sensitive receptors.  Construction traffic shall be limited—to the extent feasible—to approved haul routes established by the City.
 Prior to the start of construction activities, a sign shall be posted at the entrance(s) to the job site, clearly visible to the public, that includes permitted construction days and hours, as

CITY PARK REVITALIZATION PROJECT EIR ADDENDUM

CITY OF CORONA

5. Environmental Analysis

Page 132 ends

well as the contact information of the City’s and contractor’s authorized representatives that are assigned to respond in the event of a noise or vibration complaint. If the authorized contractor’s representative receives a complaint, they shall investigate, take appropriate corrective action, and report the action to the City.
 Signs shall be posted at the job site entrance(s), within the on-site construction zones, and along queueing lanes (if any) to reinforce the prohibition of unnecessary engine idling. All other equipment shall be turned off if not in use for more than 5 minutes.  During the entire active construction period and to the extent feasible, the use of noise producing signals, including horns, whistles, alarms, and bells, shall be for safety warning purposes only. The construction manager shall be responsible for adjusting alarms based on the background noise level, or to utilize human spotters when feasible and in compliance with all safety requirements and laws.
 When construction noise is predicted to exceed established noise standards and when the anticipated construction duration is two years or more, contractors shall erect temporary noise barriers, where feasible.

N-2 Prior to issuance of a building permit for a project requiring pile driving during construction within 135 feet of fragile structures such as historical resources, 100 feet of nonengineered timber and masonry buildings (e.g., most residential buildings), or within 75 feet of engineered concrete and masonry (no plaster), or a vibratory roller within 25 feet of any structure, the project applicant shall prepare a noise and vibration analysis to assess and mitigate potential noise and vibration impacts related to these activities. This noise and vibration analysis shall be conducted by a qualified and experienced acoustical consultant or engineer. The vibration levels shall not exceed Federal Transit Administration (FTA) architectural damage thresholds (e.g., 0.12 in/sec PPV for fragile or historical resources, 0.2 in/sec PPV for non-engineered timber and masonry buildings, and 0.3 in/sec PPV for engineered concrete and masonry), or the City threshold of 0.05 in/sec RMS (94 VdB). If vibration levels would exceed this threshold, alternative uses such static rollers and drilling piles as opposed to pile driving shall be used.

5.13.2 Conditions of Approval Applicable to the Proposed Project The following conditions of approval (COA) would be incorporated as part of the proposed project.

Conditions of Approval
COA-N-1 The City shall implement measures to reduce ed music or sound associated with live music concert and movie night events. The following measures shall be incorporated as conditions of approval for the proposed project:
 Restrict amphitheater sound system output to an average of 90 dBA Leq, averaged over a 15-minute period, at a position located 100 feet from the central lawn or portable stage area and portable movie screen of the park.

CITY PARK REVIT A LIZATION PROJECT EIR ADDENDUM

CITY OF CORONA

5. Environmental Analysis
June 2026 Page 133
 Restrict instantaneous maximum sound levels allowed for live music concerts to 95 dBA Lmax at a position located 100 feet from the central lawn or portable stage area and portable movie screen of the park.
 Noise monitoring will be conducted and monitored and reviewed throughout the event to provide sound technicians with noise data for appropriate sound system mixing board adjustments to ensure compliance with regulations.
 Noise monitoring will be conducted with a handheld sound level meter. The meter shall satisfy the American National Standards Institute (ANSI) standard for Type I or II instrumentation.

CITY PARK REVITALIZATION PROJECT EIR ADDENDUM

CITY OF CORONA

5. Environmental Analysis

Page 134 ends

5.14 POPULATION AND HOUSING

5.14.1 Summary of Impacts Identified in the Program EIR The 2020 Certified EIR concluded that the Approved Project resulted in less than significant impacts to population and housing.

Population Growth
Implementation of the Approved Project would result in an increase of 11,511 housing units, 39,298 residents, 26,478,352 square feet of building space, and 31,156 jobs over approximately 20 years in the City of Corona and its SOI. The forecast population and housing units at General Plan buildout would exceed the SCAG growth projections (172,300 persons and 49,400 housing units) by 6.8 percent and 9.4 percent, respectively, for the City of Corona. The difference between project buildout and SCAG projections is that SCAGs projections are utilized in this analysis for general comparison purposes, and buildout is based on a reasonable worst-case buildout of the parcels in the City. A comparison of the General Plan buildout to SCAG’s population, housing, and employment projections assist in providing context for comparison. More importantly, the state of California has a shortage of housing. Thus, although the increases to population and housing units are greater than SCAG’s regional forecasts for 2040, impacts would be less than significant with the incorporation of the Housing Element policies, which include aiming to provide housing to meet the community’s demand.

The Approved Project would also allow for 82,191,657 square feet of additional nonresidential development in the City and SOI, and approximately 31,156 more jobs compared to existing conditions. Although this is considered a substantial increase in employment, the forecast employment after buildout of the City would not exceed the SCAG growth projections. The City’s job-housing ratio would increase from existing conditions but would continue to be within the target ratio of 1.3 to 1.7 jobs for every housing unit. Therefore, while the buildout of the Approved Project would directly and indirectly induce population growth, the jobs-housing ratio in the City and SOI would continue to be balanced. Therefore, implementation of the Approved Project and adherence to General Plan policies would result in a less than significant impact relating to population growth.

Displacing People or Housing
The City of Corona and its SOI are developed with a variety of land uses, including residential, commercial, industrial, and open space. The proposed General Plan would allow existing uses to continue and would not change land use designations, density, and intensity levels beyond that which is in the 2004 General Plan.

Because land use designations, density, or intensity levels would be the same as in the 2004 General Plan, which was current at the time the 2020 Certified EIR was prepared, no existing uses or populations would be forced to move or be relocated as a result of project implementation. In addition, the General Plan would accommodate 11,511 new units compared to existing conditions. Therefore, impacts to the displacement of people and/or housing would be less than significant, as a result of the Approved Project implementation

CITY PARK REVIT A LIZATION PROJECT EIR ADDENDUM

CITY OF CORONA

5. Environmental Analysis
June 2026 Page 135

5.14.2 Impacts Associated with the Proposed Project
Would the project:

Environmental Issues
Condition 1:

Substantial
Change in
Project
Requiring
Major
Revisions
Condition 2:

Substantial
Change in
Circumstances
Requiring
Major
Revisions
Condition 3:

New
Information
Showing New
or Increased
Significant
Effects
Less Than
Significant
Impact/No
Changes or
New
Information
Requiring
Preparation of
an EIR/MND No Impact
a) Induce substantial unplanned population
growth in an area, either directly (for
example, by proposing new homes and
businesses) or indirectly (for example,
through extension of roads or other
infrastructure)?
X
b) Displace substantial numbers of existing
people or housing, necessitating the
construction of replacement housing
elsewhere?
X
a) Induce substantial unplanned population growth in an area, either directly (for example, by proposing new homes and businesses) or indirectly (for example, through extension of roads or other infrastructure)?
No Impact. The proposed project would continue to operate as a park serving the existing recreational needs of the City and would not induce population growth. The proposed project would not create a significant number of new employment opportunities that could result in a greater demand for local housing, since construction employment would be short-term and sourced from the surrounding areas. Any increase in onsite employment during operation would be negligible and accommodated by the existing pool of City parks staff. Additionally, the proposed project would continue to utilize the existing roads and infrastructure; with no new roads, expanded utility lines, or housing are proposed. Therefore, project development would not induce substantial population growth in the area, either directly or indirectly. Overall, there would be no new significant impacts and no substantial increase in the severity of any previously identified significant impact in the 2020 Certified EIR. No impact would occur and preparation of a supplemental or subsequent EIR is not required by CEQA.
b) Displace substantial numbers of existing people or housing, necessitating the construction of replacement housing elsewhere?
No Impact. No housing exists on the project site, nor does the proposed project include construction of housing. No relocation or construction of replacement housing would occur or be necessary as a result of the proposed project. Overall, there would be no new significant impacts, and no substantial increase in the severity of any previously identified significant impact in the 2020 Certified EIR. No impact would occur, and preparation of a supplemental or subsequent EIR is not required by CEQA.

CITY PARK REVITALIZATION PROJECT EIR ADDENDUM

CITY OF CORONA

5. Environmental Analysis

Page 136 ends

5.14.3 Adopted Mitigation Measures Applicable to the Proposed Project No mitigation measures related to population and housing were outlined in the 2020 Certified EIR.

CITY PARK REVIT A LIZATION PROJECT EIR ADDENDUM

CITY OF CORONA

5. Environmental Analysis
June 2026 Page 137

5.15 PUBLIC SERVICES

5.15.1 Summary of Impacts Identified in the Program EIR The 2020 Certified EIR concluded that the Approved Project resulted in less than significant impacts to public services.

Fire Protection
Buildout of the General Plan would result in 18,720 new residents and 13,423 new workers in the City of Corona and 20,578 new residents and 17,733 new workers in the SOI, which would result in an increase in demand for fire services and facilities. The CFD has not historically met its response time goals in the City’s periphery areas due to the location of the fire stations. The CFD does not have the command-and-control structure and equipment (e.g., bulldozers and tankers) to provide services for an extended attack. Therefore, anything that requires substantial resources (e.g., wildfires over 5 acres) requires effective support from the CFD’s partners (i.e., CAL FIRE and the US Forest Service). Fire vehicles, equipment, and expansion of existing facilities is funded partially through Development Impact Fees (DIF), a Community Facilities District (i.e., tax assessment district) and funding from property taxes. The additional demand for fire services and protection generated within the City would be satisfied through these sources. However, over 50 percent of the population and job growth associated with the General Plan would occur in the City’s SOI, which is currently designated an SRA, which means that fires in the SOI are the financial responsibility of the state (i.e., CAL FIRE). Future development projects would be reviewed by the City of Corona and CFD on an individual basis to ensure compliance with requirements in effect at the time building permits are issued, including compliance with adopted fire codes, building code, and nationally recognized fire and life safety standards of the State of California. Therefore, adherence with local and State requirements and available sources of funding to staff and purchase necessary equipment and facilities, impacts to fire protection and emergency services and facilities would be less than significant.

Police Protection
Implementation of the proposed General Plan would introduce additional residents and workers in the City of Corona, and the City’s SOI, which would result in an increase in demand for police services. According to the 2017-2018 Corona Police Strategic Plan, a goal is to maintain adequate staffing ratios, which states that a minimum of one officer per thousand residents is recommended. To meet this goal, the Corona Police Department (CPD) would need to hire an additional 19 officers to accommodate the population growth in the City of Corona and 21 officers to accommodate the growth in the SOI. However, staff needs could vary greatly based on crime trends, special events, and City and SOI needs, so staffing needs could be higher or lower.

However, over 50 percent of the population and job growth associated with the General Plan would occur within the SOI, which is currently served by the Riverside County Sheriff ’s Department. Police services staffing levels in the City of Corona would continue to be established by the CPD, and the Riverside County Sheriff ’s Department would continue to establish staffing levels for police services in the unincorporated communities until the unincorporated communities in the SOI are incorporated into the City of Corona. A plan for Services must identify in detail how and when services will be provided and funded and the recommendations for additional staff, equipment, and facilities to ensure the same level of service to the residents and businesses of

CITY PARK REVITALIZATION PROJECT EIR ADDENDUM

CITY OF CORONA

5. Environmental Analysis

Page 138 ends

the SOI for police services. As development increases in the City and SOI, the available funds from taxes, Community Facility District Fees, and DIF received from such development, and additional requirements outlined in the Plan for Services for annexations would provide the additional facilities, equipment, and officers needed to serve the growing population. Therefore, impacts to police services would be less than significant.

School Services
The increase in residents would also lead to an increase in the City and SOI’s student population, which is primarily served by the Corona-Norco Unified School District (CNUSD). There is one school in the City of Corona that is served by Alvord USD—Promenade Elementary School. The CNUSD would have adequate capacity for students generated by the Approved Project. If and when CNUSD needs to expand and construct new facilities funding for new schools would be obtained from the fee program pursuant to SB 50 and state and federal funding programs. Impacts on school services would be less than significant, as a result of the General Plan implementation.

Library Services
Implementation of the proposed General Plan would introduce additional residents and workers in the City of Corona and the City’s SOI, which would result in an increase in demand for library services. The American Library Association does not have standards for facility size and circulation, but rather, supports local benchmarks. Using benchmarks against city and county libraries across California, Corona would need to acquire 12,500 sf to meet the median benchmark. Therefore, with adequate funding sources and adherence to local policies, impacts would be less than significant.

5.15.2 Impacts Associated with the Proposed Project
Would the project:

Environmental Issues
Condition 1:

Substantial
Change in
Project
Requiring
Major
Revisions
Condition 2:

Substantial
Change in
Circumstances
Requiring
Major
Revisions
Condition 3:

New
Information
Showing New
or Increased
Significant
Effects
Less Than
Significant
Impact/No
Changes or
New
Information
Requiring
Preparation of
an EIR/MND No Impact
a) Result in substantial adverse physical
impacts associated with the provision of
new or physically altered governmental
facilities, need for new or physically altered
governmental facilities, the construction of
which could cause significant environmental
impacts, in order to maintain acceptable
service ratios, response times, or other
performance objectives for any of the public
services:

Fire protection? X
Police protection? X

CITY PARK REVIT A LIZATION PROJECT EIR ADDENDUM

CITY OF CORONA

5. Environmental Analysis
June 2026 Page 139
Environmental Issues
Condition 1:

Substantial
Change in
Project
Requiring
Major
Revisions
Condition 2:

Substantial
Change in
Circumstances
Requiring
Major
Revisions
Condition 3:

New
Information
Showing New
or Increased
Significant
Effects
Less Than
Significant
Impact/No
Changes or
New
Information
Requiring
Preparation of
an EIR/MND No Impact
Schools? X
Parks? X
Other public facilities? X
a) Result in substantial adverse physical impacts associated with the provision of new or physically altered governmental facilities, need for new or physically altered governmental facilities, the construction of which could cause significant environmental impacts, in order to maintain acceptable service ratios, response times, or other performance objectives for any of the public services:
i) Fire protection?
Less Than Significant Impact/No Changes or New Information Requiring Preparation of an EIR/MND. CFD would continue to provide fire protection and emergency services to the project site.

CFD provides fire protection, emergency services, hazardous materials response, technical rescue, and disaster preparedness and response (Corona 2019a). The nearest CFD fire station to the project site is Station #2, at 225 East Harrison Street, approximately 0.75 miles northwest. Other stations may also respond to calls from the project site and/or support fire protection needs at the project site.

Construction
During the construction of the proposed project, construction workers would temporarily be onsite.

Construction of the proposed project would be required to comply with state building and fire codes to ensure onsite safety during construction. The code includes standards for building and construction, requirements for emergency access, hazardous material handling, and fire protection systems. Construction plans for the proposed project would be reviewed and inspected by CFD to ensure all requirements are met, such as adequate emergency access to the project site during construction. Therefore, project construction would not affect fire/emergency response protection services to the extent that new or physically altered fire facilities would be needed to maintain acceptable service ratios, response times, or other performance objectives for fire protection services, construction-related impacts on fire protection would be less than significant. Accordingly, no new significant impacts or impacts of greater severity than those identified in the 2020 Certified EIR would occur. No changes or new information would require preparation of a supplemental or subsequent EIR.

Operation
The proposed project is intended to revitalize Corona City Park and expand community uses. The proposed project would redevelop the existing park with a new community center, sports facilities, aquatics center

CITY PARK REVITALIZATION PROJECT EIR ADDENDUM

CITY OF CORONA

5. Environmental Analysis

Page 140 ends

and pool, play fields, a skate area, a splash pad, a stage and screen area for community events including market/vender spaces, and ornamental landscaping. The proposed project would not induce population growth within the City; it would serve the existing and future residents of the city. However, the proposed project would increase the number of events occurring onsite. The increase in events would generate more people and activities on the project site, which may create an increase in demand for fire protection services compared to existing conditions onsite. The existing access and circulation features at the project site would be altered to better accommodate emergency access to the proposed community center, aquatics center, and other park facilities. The proposed fire lane would be approximately 28 feet wide and accessible via the newly constructed promenade and market plaza. This paved access route would extend through the central portion of the project site, connecting East 6th Street to Quarry Street. The proposed project would be designed to accommodate emergency access to the project site in accordance with the fire code. Emergency vehicles would have access to the project site and all other areas of the site via four parking lots: two along Quarry Street, one at the intersection of Rimpau Avenue and East 6th Street, and one at the intersection of East Grand Boulevard and East 6th Street. The proposed project site access would be reviewed by CFD, and proposed events on-site would be supervised by the City. Although the proposed project may create a slight increase in the demand for fire protection services compared to existing conditions, the proposed project would not generate an increase in fire protection facilities or personnel in a manner that would require new or physically altered fire protection facilities. The proposed project would not require new or physically alter fire protection facilities or routes. The proposed project would have a less than significant impact on fire protection services. Accordingly, no new significant impacts or impacts of greater severity than those identified in the 2020 Certified EIR would occur. No changes or new information would require preparation of a supplemental or subsequent EIR.
ii) Police protection?
Less Than Significant Impact/No Changes or New Information Requiring Preparation of an EIR/MND. The City of Corona receives police services from CPD. CPD provides police protections services out of the Corona Police Department at 730 Public Safety Way approximately 1.3 miles northwest of the project site.

Construction
During the construction of the proposed project, construction workers would temporarily be on-site.

Construction of the proposed project would maintain emergency access and emergency egress routes during project construction. Active construction areas would be fenced during the construction phase, and construction site access would be limited to authorized personnel. Further, the storage and staging of construction equipment would occur onsite, which is fenced, and equipment and vehicles would be locked and only accessible by authorized personnel. Therefore, the temporary construction activities of the proposed project would not materially increase the demand for police protection services. It would not result in the need for physically altered or new sheriff facilities, which could result in environmental impacts, and impacts would be less than significant. Accordingly, no new significant impacts or impacts of greater severity than those identified in the 2020 Certified EIR would occur. No changes or new information would require preparation of a supplemental or subsequent EIR.

CITY PARK REVIT A LIZATION PROJECT EIR ADDENDUM

CITY OF CORONA

5. Environmental Analysis
June 2026 Page 141
Operation
The proposed project is intended to revitalize Corona City Park and expand community uses. The proposed project would redevelop the existing park with a new community center, sports facilities, aquatics center and pool, play fields, a skate area, a splash pad, a stage and screen area for community events including market/vender spaces, and ornamental landscaping. The proposed project would not induce population growth within the City; it would serve the existing and future residents of the city. However, the proposed project would increase the number of events occurring onsite. The increase in events would generate more people and activities on the project site, which may create an increase in demand for police protection services compared to existing conditions onsite. Further, as discussed above, the proposed project would alter emergency access, but emergency access would be designed in accordance with the fire code and would be reviewed by the CPD. Although the proposed project may create a slight increase in the demand for police protection services compared to existing conditions, the proposed project would not generate an increase in police protection facilities or personnel that would require new or physically altered police protection facilities. The proposed project would have a less than significant impact on police protection services. Accordingly, no new significant impacts or impacts of greater severity than those identified in the 2020 Certified EIR would occur. No changes or new information would require preparation of a supplemental or subsequent EIR.
iii) Schools?
Less Than Significant Impact/No Changes or New Information Requiring Preparation of an EIR/MND. The proposed project would revitalize the existing Corona City Park, and all construction would be limited to the project site boundaries. The closest school campus is Lincoln Fundamental Elementary School approximately 0.30 miles south of the project site. Additionally, demand for schools is largely generated by new housing developments. The proposed project would continue to operate as a park and serve the existing resident populations’ recreational needs and would not induce population growth.

Therefore, no impact to schools would occur. Accordingly, no new significant impacts or impacts of greater severity than those identified in the 2020 Certified EIR would occur. No changes or new information would require preparation of a supplemental or subsequent EIR. iv) Parks?
Less Than Significant Impact/No Changes or New Information Requiring Preparation of an EIR/MND. The proposed project would revitalize the existing Corona City Park and all construction would be limited to the project site boundaries. The proposed project would redevelop the existing park with a new community center, sports facilities, aquatics center and pool, play fields, a skate area, a splash pad, a stage and screen area for community events including market/vender spaces, and ornamental landscaping. The proposed project would not induce population growth within the City. However, the proposed project would increase the number of events occurring on-site. Yet it would not increase the use of existing surrounding parks or recreational facilities in the city, or the need for new parks or recreational facilities. The proposed project would continue to operate as a park available to the public and serve the City’s recreational needs. Thus, the proposed project would provide improved recreational opportunities to the City and surrounding communities and moderately increase the demand on the Corona City Park. A

CITY PARK REVITALIZATION PROJECT EIR ADDENDUM

CITY OF CORONA

5. Environmental Analysis

Page 142 ends

less than significant impact to parks would occur. Accordingly, no new significant impacts or impacts of greater severity than those identified in the 2020m Certified EIR would occur. No changes or new information would require preparation of a supplemental or subsequent EIR. v) Other public facilities?
Less Than Significant Impact/No Changes or New Information Requiring Preparation of an EIR/MND. The City of Corona contains and operates one public library, the Corona Public Library at 605 South Main Street approximately 0.50 miles west of the project site. The proposed project would revitalize the Corona City Park and would not induce population growth. Therefore, the proposed project would not generate any additional demand for library facilities. The proposed project would not require new or physically alter library facilities. A less than significant impact to libraries would occur. Accordingly, no new significant impacts or impacts of greater severity than those identified in the 2020 Certified EIR would occur. No changes or new information would require preparation of a supplemental or subsequent EIR.

5.15.3 Adopted Mitigation Measures Applicable to the Proposed Project No mitigation measures related to public services were outlined in the 2020 Certified EIR.

CITY PARK REVIT A LIZATION PROJECT EIR ADDENDUM

CITY OF CORONA

5. Environmental Analysis
June 2026 Page 143

5.16 RECREATION

5.16.1 Summary of Impacts Identified in the Program EIR The 2020 Certified EIR concluded that the Approved Project resulted in less than significant impacts to recreation.

Use of Existing Parks and Recreational Facilities
Buildout of the proposed project would allow for the development of up to 11,511 dwelling units, and an estimated increase in population of 39,298 residents. This increase in population would increase the use of existing parks and recreational facilities. There is no state or federal statute detailing how to calculate the City’s level of park service; however, the City’s park standard is 3 acres of parkland per 1,000 residents. Buildout of the General Plan would result in an increase in parkland demand of 56 acres in the City and 62 acres in the SOI, for a total of 118 acres. Additional growth would be accommodated by the existing parkland in the City and SOI. Further, new developments would be required to pay development impact fees and/or dedicate parkland or pay an in-lieu fee. The adherence to local policies and construction of new parks to keep up with demand would reduce impacts to less than significant.

Environmental Impacts
Buildout under the General Plan would increase the City’s population growth and availability of funds, and portions of undeveloped land would be improved as parks and recreational facilities to provide residents with new recreational opportunities while meeting the City’s parkland standard of 3 acres per 1,000 residents.

Development and operation of future new or expanded parks and recreational facilities may have an adverse physical effect on the environment, including impacts relating to air quality, biological resources, lighting, noise, and traffic. Site-specific impacts analysis of these future parks would be required under CEQA. The expansion of parks and recreational facilities pursuant to the buildout of the land use plan would be less than significant upon the implementation of the General Plan goals, policies, and implementation actions and existing federal, state, and local regulations.

5.16.2 Impacts Associated with the Proposed Project
Environmental Issues
Condition 1:

Substantial
Change in
Project
Requiring
Major
Revisions
Condition 2:

Substantial
Change in
Circumstances
Requiring
Major
Revisions
Condition 3:

New
Information
Showing New
or Increased
Significant
Effects
Less Than
Significant
Impact/No
Changes or
New
Information
Requiring
Preparation of
an EIR/MND No Impact
a) Would the project increase the use of
existing neighborhood and regional parks or
other recreational facilities such that
substantial physical deterioration of the
facility would occur or be accelerated?
X

CITY PARK REVITALIZATION PROJECT EIR ADDENDUM

CITY OF CORONA

5. Environmental Analysis

Page 144 ends

Environmental Issues
Condition 1:

Substantial
Change in
Project
Requiring
Major
Revisions
Condition 2:

Substantial
Change in
Circumstances
Requiring
Major
Revisions
Condition 3:

New
Information
Showing New
or Increased
Significant
Effects
Less Than
Significant
Impact/No
Changes or
New
Information
Requiring
Preparation of
an EIR/MND No Impact
b) Does the project include recreational
facilities or require the construction or
expansion of recreational facilities which
might have an adverse physical effect on
the environment?
X
a) Would the project increase the use of existing neighborhood and regional parks or other recreational facilities, such that substantial physical deterioration of the facility would occur or be accelerated?
Less Than Significant Impact/No Changes or New Information Requiring Preparation of an EIR/MND. The City of Coronas’ Community Services Department’s Park Division operates 35 parks, various walking trails, bike paths, and other open space areas (i.e., Fresno Canyon and Sage Open Space) (Corona 2020).

The City has access to “Cleveland National Forest, which forms the southwest boundary of the City; Prado Basin, to the northwest of the City; and Chino Hills State Park to the northwest of the City,” which provides additional recreational uses including hiking, bicycling, equestrian use, and camping (Corona 2020).

Additionally, residents have access to various local public schools within the City for additional active recreational facilities after school hours.

The proposed project would revitalize Corona City Park, one of the existing 35 parks within the City.

Improvements to the park would enhance sports and playground facilities, and include construction of a new community center, an aquatics center, pedestrian walkways, and other park amenities. The revitalized park would be open to the public and residents of the City of Corona. The proposed project does not include the construction of new housing, nor would it induce population growth. With the expansion of recreational services, there may be a marginal increase in use; however, uses would be similar to existing conditions and would not generate an increased demand for other existing neighborhood or regional parks or recreational facilities and would not result in substantial physical deterioration of such facilities nor cause deterioration to accelerate. Additionally, the proposed project would be consistent with General Plan Policies LU 1.1, 5.5, 5.8, and 15.1. Therefore, as with the Approved Project, a less than significant impact would occur. Accordingly, no new significant impacts or impacts of greater severity than those identified in the 2020 Certified EIR would occur. No changes or new information would require preparation of a supplemental or subsequent EIR. b) Does the project include recreational facilities or require the construction or expansion of recreational facilities, which might have an adverse physical effect on the environment? Less Than Significant Impact/No Changes or New Information Requiring Preparation of an EIR/MND. The proposed project is a park revitalization project of the existing Corona City Park.

Construction of the proposed project would involve site preparation activities, including demolition, grading

CITY PARK REVIT A LIZATION PROJECT EIR ADDENDUM

CITY OF CORONA

5. Environmental Analysis
June 2026 Page 145
and excavation, and construction of permanent facilities. Staging for construction equipment and activities would occur on an adjacent vacant parcel, and not within any off-site parkland or recreational facility. These construction activities would be limited to the project site and would not restrict access to nearby off-site recreational facilities. The physical environmental effects of the proposed project’s construction activities are evaluated under the relevant topical sections of this Addendum, where impacts were determined to be less than significant with mitigation incorporated. The proposed project would not require the construction or expansion of recreational facilities beyond what is evaluated in this Addendum. Therefore, a less than significant impact would occur. Accordingly, no new significant impacts or impacts of greater severity than those identified in the 2020 Certified EIR would occur. No changes or new information would require preparation of a supplemental or subsequent EIR.

5.16.3 Adopted Mitigation Measures Applicable to the Proposed Project No mitigation measures related to recreation were outlined in the 2020 Certified EIR. .

CITY PARK REVITALIZATION PROJECT EIR ADDENDUM

CITY OF CORONA

5. Environmental Analysis

Page 146 ends

5.17 TRANSPORTATION/TRAFFIC

5.17.1 Summary of Impacts Identified in the Program EIR The 2020 Certified EIR concluded that, even after the implementation of mitigation measures, the Approved Project resulted in significant transportation/traffic impacts.

Plan Consistency
Implementation of the Approved Project would increase demand for public transit, bicycle, and pedestrian facilities, which would require the improvement and expansion of the circulation system. The Circulation Element includes policies that support public transit, bicycle improvements, and improvements to the pedestrian facilities. Additionally, the General Plan is consistent with the 2016 SCAG Regional Transportation Plan/Sustainability Communities Strategy (RTP/SCS). Future development would be constructed in consistency with regional and local planning efforts supporting these modes of travel.

Traffic generated by General Plan Buildout conditions plus the traffic generated by regional growth would contribute to the existing congestion of I-15 and SR-91 and, therefore, would conflict with the Riverside County Congestion Management Plan (CMP). A potentially significant impact was identified.

Trip Generation
The City of Corona has adopted a threshold of no net increase in VMT compared to existing conditions.

Buildout of the Approved Project is anticipated to increase VMT compared to existing conditions due to the planned growth in the outlying areas of the City rather than in the City center, which is already built out.

Cumulatively, the buildout of the General Plan would result in a slight (0.03 percent) increase in VMT. The increase in VMT forecasted is within the model standard error and is likely negligible. However, cumulative impacts are conservatively considered significant because the model results show an increase compared to the 2004 General Plan.

Circulation Improvements and Emergency Access
Buildout of the Approved Project would involve the alteration, intensification, and redistribution of land uses in the City, and thus, improvements to the circulation network. These improvements would be subject to review and future consideration by the City’s Public Works engineering staff. Roadway improvements would have to be made in accordance with the City’s circulation plan and roadway design guidelines and meet design guidelines in the California Manual of Uniform Traffic Control Devices and the Caltrans Roadway Design Manual.

Adherence to the local and State policies reduces impacts, and implementation of the General Plan would not result in hazardous conditions, create conflicting uses, or cause a detriment to emergency vehicle access.

CITY PARK REVIT A LIZATION PROJECT EIR ADDENDUM

CITY OF CORONA

5. Environmental Analysis
June 2026 Page 147

5.17.2 Impacts Associated with the Proposed Project
Would the project:

Environmental Issues
Condition 1:

Substantial
Change in
Project
Requiring
Major
Revisions
Condition 2:

Substantial
Change in
Circumstances
Requiring
Major
Revisions
Condition 3:

New
Information
Showing New
or Increased
Significant
Effects
Less Than
Significant
Impact/No
Changes or
New
Information
Requiring
Preparation of
an EIR/MND No Impact
a) Conflict with a program, plan, ordinance or
policy addressing the circulation system,
including transit, roadway, bicycle and
pedestrian facilities?
X
b) Conflict or be inconsistent with CEQA
Guidelines § 15064.3, subdivision (b)? X
c) Substantially increase hazards due to a
geometric design feature (e.g., sharp curves
or dangerous intersections) or incompatible
uses (e.g., farm equipment)?
X
d) Result in inadequate emergency access? X
a) Conflict with a program, plan, ordinance or policy addressing the circulation system, including transit, roadway, bicycle and pedestrian facilities?
Less Than Significant Impact/No Changes or New Information Requiring Preparation of an EIR/MND. A significant impact may occur if the proposed project conflicts with an applicable plan, ordinance, or policy establishing measures of effectiveness for the performance of the circulation system. The City’s General Plan Circulation Element sets forth goals and policies pertaining to complete streets, transit and public transportation, bicycle routes and pedestrian facilities, and safety, among others. The proposed project would support the Circulation Element.

Proposed project features would include pedestrian walkways connecting facilities within the site, as well as connections with the adjacent public sidewalks. The proposed project also includes street trees and streetscaping plants along public frontages in accordance with the City’s standards to increase tree canopy and provide a safe and inviting new pedestrian network. Bicycle access is available via bike lanes along the north and south sides of East 6th Street in both directions. The proposed project would not impact the existing bicycle access and circulation. Additionally, RTA Bus Route 1 services the Sixth Street bus stop adjacent to the site. The proposed project would not impact bus, and RTA Bus Route 1 would continue to serve users of the project site.

The proposed project would help implement and be consistent with the General Plan’s goals and policies, including but not limited to:
 Policy CE-5.1. Provide for safety of bicyclists, equestrians, and pedestrians by adhering to national standards and uniform practices; adhere to accessibility requirements for people with disabilities.

CITY PARK REVITALIZATION PROJECT EIR ADDENDUM

CITY OF CORONA

5. Environmental Analysis

Page 148 ends

 Policy CE-5.2. Maintain existing pedestrian facilities and encourage new development to provide walkways between and through developments.
 Policy CE-5.6. Encourage new and existing development to provide accessible and secure areas for bicycle storage. Provide bicycle racks or storage facilities at public facilities and require bicycle parking, storage, and other support facilities as part of new office and retail developments.

The proposed project would not result in conflicts with adopted policies, plans, or programs, nor is it expected to negatively affect the performance or safety of existing or planned pedestrian, bicycle, or transit facilities. It would have a less than significant impact on transit, roadway, bicycle, and pedestrian facilities in the vicinity of the project site. Accordingly, no new significant impacts or impacts of greater severity than those identified in the 2020 Certified EIR would occur. No changes or new information would require preparation of a supplemental or subsequent EIR.
b) Conflict or be inconsistent with CEQA Guidelines § 15064.3, subdivision (b)? Less Than Significant Impact/No Changes or New Information Requiring Preparation of an EIR/MND. On September 27, 2013, SB 743 was signed into law, which started a process that fundamentally changed transportation impact analysis as part of CEQA compliance. These changes include the elimination of auto delay, level of service, and other similar measures of vehicular capacity or traffic congestion as a basis for determining significant impacts in CEQA review. As part of the updated CEQA Guidelines, the new criteria “shall promote the reduction of greenhouse gas emissions, the development of multimodal transportation networks, and a diversity of land uses” (Public Resources Code sec. 21099(b)(1)). On January 20, 2016, the Governor’s Office of Planning and Research released revisions to its proposed CEQA guidelines for the implementation of SB 743. Final review and rulemaking for the new guidelines were completed on December 28, 2018, when the California Natural Resource Agency certified and adopted the CEQA Guidelines update package, including guidelines implementing SB 743.

Vehicle miles traveled (VMT) is an indicator of the travel levels on the roadway system by motor vehicles. It corresponds to the number of vehicles multiplied by the distance traveled in a given period over a geographical area. In other words, VMT is a function of (1) number of daily trips and (2) the average trip length (VMT = daily trips x average trip length).

A VMT Screening Analysis was conducted for the proposed project and is included in Appendix F.

Transportation impacts under CEQA are based on VMT. Per the City of Corona Guidelines, several screening criteria may be applied to determine the need for VMT modeling and analysis. Projects that meet any of the following screening criteria are generally presumed to generate below-average VMT and therefore have a lessthan-significant transportation impact under CEQA:
 Projects located within Transit Priority Areas (TPAs) or High Quality Transit Areas (HQTAs) as determined by the most recent Southern California Association of Governments (SCAG) RTP/SCS. TPAs are defined as a ½ mile radius around an existing or planned major transit stop or an existing stop along a high quality transit corridor. HQTAs are defined as a corridor with fixed route bus service with service intervals no longer than 15 minutes during peak commute hours.

CITY PARK REVIT A LIZATION PROJECT EIR ADDENDUM

CITY OF CORONA

5. Environmental Analysis
June 2026 Page 149
 Projects located in a low VMT-generating Traffic Analysis Zone (TAZ).

As confirmed with the SCAG HQTA Map, the project site is determined to be within an HQTA as required by the City of Ontario Guidelines and RTA Bus Route 1 services the Sixth Street bus stop adjacent to the site.

Therefore, the proposed project satisfies the HQTA criteria. The Western Riverside Council of Governments VMT Tool confirmed that the project site is in a low-VMT generating zone (Albert J. Webb Associates 2025).

Additionally, the proposed project consists of revitalizing the existing Corona City Park and does not result in a change from the existing public park space. The proposed project is consistent with the SCAG SCS/RTP and is screened out from further analysis based on the City of Corona Guidelines. Thus, the project is considered to have a less-than-significant impact on VMT and therefore screened from further analysis Therefore, impacts would be less than significant. Accordingly, no new significant impacts or impacts of greater severity than those identified in the 2020 Certified EIR would occur. No changes or new information would require preparation of a supplemental or subsequent EIR.
c) Substantially increase hazards due to a geometric design feature (e.g., sharp curves or dangerous intersections) or incompatible uses (e.g., farm equipment)? Less Than Significant Impact/No Changes or New Information Requiring Preparation of an EIR/MND. Vehicular access to the project site is planned to be accommodated by a total of six vehicle access points: an ingress and egress access point via Rimpau Avenue, two ingress/egress access point via Quarry Street, one ingress/egress access point via East Grand Boulevard, and two ingress/egress access point via East 6th Street. The new vehicle access points would be designed and constructed to ensure adequate vehicle and emergency access and provide a continuous path of travel. All access and circulation improvements would be reviewed by the CFD and would be constructed to City and CFD standards. The proposed project does not include any major changes to roadways, or pedestrian circulation. The proposed project includes improvements to the on-site vehicular circulation discussed in Section 3.2.5 and Figure 6. Based on the Transportation Assessment there would be no deficiencies at the studied roadway segments at and surrounding the project site as a result of the proposed project (Appendix G). The proposed project would not cause or contribute to excessive queuing and would not result in a safety impact at the Caltrans off-ramps (Main Street & SR 91 westbound and eastbound ramps). The Transportation Assessment identifies additional circulation improvement measures that may be incorporated during final design to further enhance on-site circulation efficiency. These measures are not required to avoid or reduce a significant transportation impact associated with the proposed project. The proposed project’s driveways and vehicular access points would not introduce hazardous design features. Additionally, the proposed project is an urban area and does not include incompatible uses such as farm equipment. As such, the proposed project does not represent an incompatible use. Therefore, impacts would be less than significant. Accordingly, no new significant impacts or impacts of greater severity than those identified in the 2020 Certified EIR would occur. No changes or new information would require preparation of a supplemental or subsequent EIR. d) Result in inadequate emergency access?
Less Than Significant Impact/No Changes or New Information Requiring Preparation of an EIR/MND. The proposed project would provide adequate emergency access to the project site and does not

CITY PARK REVITALIZATION PROJECT EIR ADDENDUM

CITY OF CORONA

5. Environmental Analysis

Page 150 ends

alter any existing public roadways. All proposed parking lot and circulation improvements are subject to CFD review and approval. Additionally, the proposed project includes a new fire lane that would extend through the central portion of the project site, connecting East 6th Street to Quarry Street, providing additional emergency access to the project site Therefore, the proposed project would result in less than significant impacts to emergency access. Accordingly, no new significant impacts or impacts of greater severity than those identified in the 2020 Certified EIR would occur. No changes or new information would require preparation of a supplemental or subsequent EIR.

5.17.3 Adopted Mitigation Measures Applicable to the Proposed Project The following mitigation measures were taken directly from the 2020 Certified EIR and would be incorporated as part of the proposed project.

The proposed project is scoped out of VMT and therefore the following mitigation does not apply.

T-1 The City shall consider the following implementation programs to reduce citywide VMT:
 VMT exchange program. VMT generators can select from a pre-approved list of mitigation projects that may be located within the same jurisdiction or possibly from a larger area. The intent is to match the project’s needed VMT reduction with a specific mitigation project of matching size and to provide evidence that the VMT reduction will reasonably occur.
 VMT Mitigation Bank. A mitigation bank is intended to serve as an entity or organization that pools fees from development projects across multiple jurisdictions to spend on larger scale mitigation projects. This concept differs from the more conventional impact fee program approach described above in that the fees are directed to a few larger projects that have the potential for a more significant reduction in VMT and the program is regional in nature.

CITY PARK REVIT A LIZATION PROJECT EIR ADDENDUM

CITY OF CORONA

5. Environmental Analysis
June 2026 Page 151

5.18 TRIBAL CULTURAL RESOURCES

5.18.1 Summary of Impacts Identified in the Program EIR The 2020 Certified EIR concluded that impacts to tribal cultural resources would be less than significant with the implementation of mitigation measures.

Tribal Cultural Resources
A total of 70 previously recorded resources within the City of Corona (including 30 prehistoric resources) and 86 resources in the City’s SOI (including 74 prehistoric resources). NAHC stated that buildout of the Approved Project would impact potential sites and provided a list of 31 Native American groups and individuals who may have knowledge of tribal cultural resources (TCR) in the City. Future development could include grading and construction activities of undeveloped areas and disturb tribal cultural resources. Adherence to Approved Project policies and state guidelines would reduce impacts; however, ground disturbing activities could be potentially significant to TCR. Mitigation Measures TCR-1 through TCR-3 and Mitigation Measure CUL-5 identified in the 2020 Certified EIR would reduce potential impacts associated with tribal cultural resources to a level that is less than significant.

5.18.2 Impacts Associated with the Proposed Project
Environmental Issues
Condition 1:

Substantial
Change in
Project
Requiring
Major
Revisions
Condition 2:

Substantial
Change in
Circumstances
Requiring
Major
Revisions
Condition 3:

New
Information
Showing New
or Increased
Significant
Effects
Less Than
Significant
Impact/No
Changes or
New
Information
Requiring
Preparation of
an EIR/MND No Impact
a) Would the project cause a substantial
adverse change in the significance of a
tribal cultural resource, defined in Public
Resources Code § 21074 as either a site,
feature, place, cultural landscape that is
geographically defined in terms of the size
and scope of the landscape, sacred place,
or object with cultural value to a California
Native American tribe, and that is:
i) Listed or eligible for listing in the
California Register of Historical
Resources, or in a local register of
historical resources as defined in
Public Resources Code section
5020.1(k), or
X

CITY PARK REVITALIZATION PROJECT EIR ADDENDUM

CITY OF CORONA

5. Environmental Analysis

Page 152 ends

Environmental Issues
Condition 1:

Substantial
Change in
Project
Requiring
Major
Revisions
Condition 2:

Substantial
Change in
Circumstances
Requiring
Major
Revisions
Condition 3:

New
Information
Showing New
or Increased
Significant
Effects
Less Than
Significant
Impact/No
Changes or
New
Information
Requiring
Preparation of
an EIR/MND No Impact
ii) A resource determined by the lead
agency, in its discretion and supported
by substantial evidence, to be
significant pursuant to criteria set forth
in subdivision (c) of Public Resources
Code § 5024.1. In applying the criteria
set forth in subdivision (c) of Public
Resource Code § 5024.1, the lead
agency shall consider the significance
of the resource to a California Native
American tribe.

X
a) Would the project cause a substantial adverse change in the significance of a tribal cultural resource, defined in Public Resources Code section 21074 as either a site, feature, place, cultural landscape that is geographically defined in terms of the size and scope of the landscape, sacred place, or object with cultural value to a California Native American tribe, and that is:
i) Listed or eligible for listing in the California Register of Historical Resources, or in a local register of historical resources as defined in Public Resources Code section 5020.1(k), or No Impact. As shown in Figure 3, Aerial Photograph with Photo Locations, the project site is developed with the Corona City Park and related buildings, play structures, and site improvements. The existing park began development in 1912 and became Corona’s first public park opening in 1913. The AARIE Report prepared for the proposed project (Appendix D) conducted a records search and identified four previously recorded resources on the project site. However, these resources are not identified TCRs. No TCRs listed or eligible for listing in the California Register of Historical resources or in a local register of historical resources as defined in Public Resources Code Section 5020.1(k) were identified in the project site or immediate vicinity.

Therefore, no impacts to TCRs listed or eligible for listing in the California Register of Historical Resources, or in a local register of historical resources would occur. Accordingly, no new significant impacts or impacts of greater severity than those identified in the 2020 Certified EIR would occur. No changes or new information would require preparation of a supplemental or subsequent EIR. ii) A resource determined by the lead agency, in its discretion and supported by substantial evidence, to be significant pursuant to criteria set forth in subdivision (c) of Public Resources Code section 5024.1. In applying the criteria set forth in subdivision (c) of Public Resource

CITY PARK REVIT A LIZATION PROJECT EIR ADDENDUM

CITY OF CORONA

5. Environmental Analysis
June 2026 Page 153
Code Section 5024.1, the lead agency shall consider the significance of the resource to a California Native American tribe.

Less Than Significant Impact/No Changes or New Information Requiring Preparation of an EIR/MND. The formal notification pursuant to AB 52 is not required for an addendum. However, the City notified a total of 31 tribes and conducted informal consultation with the Gabrielino Band of Mission Indians–Kizh Nation for the Approved Project. The Gabrielino Band of Mission Indians–Kizh Nation, identified the project area within their geographic and ancestral area. Although the 2020 Certified EIR provided TCR mitigation measures, the Gabrielino Band of Mission Indians–Kizh Nation provided their own mitigation measures to protect the potential TCRs that could inadvertently be discovered during the proposed project’s ground-disturbing activities. Mitigation measures provided by the Gabrielino Band of Mission Indians–Kizh Nation have been incorporated into the mitigation measures identified by the 2020 Certified EIR, as applicable. Implementation of TCR-1 and TCR-2, described below, in accordance with General Plan Policies HR-3.3 and HR-4.4, would ensure that impacts to tribal cultural resources are less than significant. Accordingly, no new significant impacts or impacts of greater severity than those identified in the 2020 Certified EIR would occur. No changes or new information would require preparation of a supplemental or subsequent EIR.

5.18.3 Adopted Mitigation Measures Applicable to the Proposed Project The following mitigation measures were taken directly from the 2020 Certified EIR and would be incorporated as part of the proposed project. Any modifications to these mitigation measures are shown in strikethrough for deleted text and underline for new, inserted text.

TCR-1 Tribal Cultural Resources Monitoring Prior to Commencement of Ground Disturbing Activities. The project archaeologist, in consultation with interested tribes, the developer and the City of Corona, shall develop an Archaeological Monitoring Plan (AMP) to address the details, timing and responsibility of archaeological and cultural activities that will occur on the project site. Details in the AMP shall include:

A. The project applicant/lead agency shall retain a Native American Monitor from or approved by the Gabrieleño Band of Mission Indians – Kizh Nation (“Tribe”). The monitor shall be retained prior to the commencement of any “ground-disturbing activity” for the subject project at all project locations (i.e., both on-site and any off-site locations that are included in the project description/definition and/or required in connection with the project, such as public improvement work). “Ground-disturbing activity” shall include, but is not limited to, potholing, auguring, tree removal, boring, grading, excavation, drilling, and trenching.

B. A copy of the monitoring agreement shall be submitted to the lead agency prior to the earlier of the commencement of any ground-disturbing activity, or the issuance of any permit necessary to commence a ground-disturbing activity.

C. The monitor will complete daily monitoring logs that will provide descriptions of the relevant ground-disturbing activities, the type of construction activities performed,

CITY PARK REVITALIZATION PROJECT EIR ADDENDUM

CITY OF CORONA

5. Environmental Analysis

Page 154 ends

locations of ground-disturbing activities, soil types, cultural-related materials, and any other facts, conditions, materials, or discoveries of significance to the Tribe. Monitor logs will identify and describe any discovered TCRs, including but not limited to, Native American cultural and historical artifacts, places of significance, etc. as defined in Public Resources Code Section 21074, (collectively, tribal cultural resources, or “TCR”), as well as any discovered Native American human remains and associated grave goods. Copies of monitor logs will be provided to the project applicant/lead agency upon written request to the Tribe.

D. On-site tribal monitoring shall conclude upon written confirmation to the Tribe from a designated point of contact for the project applicant/lead agency that all grounddisturbing activities and phases that may involve ground-disturbing activities on the project site or in connection with the project are complete.

1. Project-related ground disturbance (including, but not limited to, brush clearing, grading, trenching, etc.) and development scheduling;

2. The development of a rotating or simultaneous schedule in coordination with the developer and the project archeologist for designated Native American Tribal Monitors from the consulting tribes during grading, excavation and ground disturbing activities on the site: including the scheduling, safety requirements, duties, scope of work, and Native American Tribal Monitors’ authority to stop and redirect grading activities in coordination with all project archaeologists (if the tribes cannot come to an agreement on the rotating or simultaneous schedule of tribal monitoring, the Native American Heritage Commission shall designate the schedule for the onsite Native American Tribal Monitor for the proposed project);

3. The protocols and stipulations that the developer, City, Tribes and project archaeologist will follow in the event of inadvertent cultural resources discoveries, including any newly discovered cultural resource deposits that shall be subject to a cultural resources evaluation.

At least 30-days prior to application for a grading permit and before any brush clearance, grading, excavation and/or ground disturbing activities on the site take place, the future developer shall retain a tribal cultural monitor to monitor all ground-disturbing activities in an effort to identify any unknown archaeological resources.

Pursuant to the AMP, a tribal monitor the Gabrieleño Band of Mission Indians – Kizh Nation shall be present during the initial grading activities. If tribal resources are found during grubbing activities, the tribal monitoring shall be present during site grading activities.

TCR-2 Treatment and Disposition of Unanticipated Discovery of Tribal Cultural Resources or Human Remains.

CITY PARK REVIT A LIZATION PROJECT EIR ADDENDUM

CITY OF CORONA

5. Environmental Analysis
June 2026 Page 155
A. Native American human remains are defined in PRC 5097.98 (d)(1) as an inhumation or cremation, and in any state of decomposition or skeletal completeness. Funerary objects, called associated grave goods in Public Resources Code Section 5097.98, are also to be treated according to this statute.

B. Human remains and associated grave goods shall be treated alike per California Public Resources Code section 5097.98(d)(2).

C. Any discovery of human remains/associated grave goods shall be kept confidential as required by state law.

D. Upon discovery of any TCRs, all construction activities in the immediate vicinity of the discovery shall cease (i.e., not less than the surrounding 50 feet) and shall not resume until the discovered TCRs are removed in the form and/or manner the Tribe deems appropriate, in the Tribe’s sole discretion, and for any purpose the Tribe deems appropriate, including for educational, cultural and/or historic purposes.

E. In the event of a discovery of Native American human remains, the project applicant shall comply with PRC 5097.98.

In the event that Native American cultural resources are inadvertently discovered during the course of any ground disturbing activities, including but not limited to brush clearance, grading, trenching, etc. grading for the proposed project, the following procedures will be carried out for treatment and disposition of the discoveries:

1. Notification of Tribes: If tribal resources are found, Gabrieleño Band of Mission Indians – Kizh Nation and Augustine Band of Cahuilla Indians shall also be contacted for further evaluation of the resources.

2. Temporary Curation and Storage: During the course of construction, all discovered resources shall be temporarily curated in a secure location onsite or at the offices of the project archaeologist. The removal of any artifacts from the project site will need to be thoroughly inventoried with tribal monitor oversite of the process; and

3. Treatment and Final Disposition: The landowner(s) shall relinquish ownership of all cultural resources, including sacred items, burial goods, and all archaeological artifacts and non-human remains as part of the required mitigation for impacts to cultural resources.

The applicant shall relinquish the artifacts through one or more of the following methods and provide the City of Corona with evidence of same:
a. Accommodate the process for onsite reburial of the discovered items with the consulting Native American tribes or bands. This shall include measures and provisions to protect the future reburial area from any future impacts. Reburial shall not occur until all cataloguing, basic analysis, and other analyses as recommended by the project archaeologist and approved by consulting tribes and basic recordation have been completed; all documentation should be at a level of

CITY PARK REVITALIZATION PROJECT EIR ADDENDUM

CITY OF CORONA

5. Environmental Analysis

Page 156 ends

standard professional practice to allow the writing of a report of professional quality;
b. A curation agreement with an appropriate qualified repository within San Bernardino County that meets federal standards per 36 CFR Part 79 and therefore would be professionally curated and made available to other archaeologists/researchers for further study. The collections and associated records shall be transferred, including title, to an appropriate curation facility within San Bernardino County, to be accompanied by payment of the fees necessary for permanent curation;
c. For purposes of conflict resolution, if more than one Native American tribe or band is involved with the project and cannot come to an agreement as to the disposition of cultural materials, they shall be curated at the San Bernardino County Museum by default;
d. At the completion of grading, excavation and ground disturbing activities on the site, a Phase IV Monitoring Report shall be submitted to the City documenting monitoring activities conducted by the project archaeologist and Native Tribal Monitors within 60 days of completion of grading. This report shall document the impacts to the known resources on the property; describe how each mitigation measure was fulfilled; document the type of cultural resources recovered and the disposition of such resources; provide evidence of the required cultural sensitivity training for the construction staff held during the required pregrade meeting; and, in a confidential appendix, include the daily/weekly monitoring notes from the archaeologist. All reports produced will be submitted to the City, County Museum, and consulting tribes.

TCR-3 During construction activities, the project applicant shall allow additional archaeological monitors of Native American tribes to access the project site on a volunteer basis to monitor grading and excavation activities.

CITY PARK REVIT A LIZATION PROJECT EIR ADDENDUM

CITY OF CORONA

5. Environmental Analysis
June 2026 Page 157

5.19 UTILITIES AND SYSTEM SERVICES

5.19.1 Summary of Impacts Identified in the Program EIR The 2020 Certified EIR concluded that the Approved Project resulted in less than significant impacts to utilities and service systems.

Sewer System
Buildout of the Approved Project would involve the installation of new or expanded sewer laterals and mains in the City and SOI. Full buildout under the proposed General Plan is estimated to generate an increase of total sewer flows in the City and SOI by 4,058,546 gallons per day (GPD) or 12 percent. Existing sewer flows in the City and SOI are 15.2 million gallons per day (MGD), and proposed conditions would be 17.1 MGD.

The 1.8 million gallons per day (MGD) (1,830,240 GPD) change in sewer flows between existing conditions and proposed conditions would not exceed the projected future capacity of the City’s Water Reclamation Facilities (WRFs) which have a total future treatment capacity of 18 MGD. Additionally, developer fees and individual required permits and applications would vary be required and reduce impacts. No impact is anticipated.

Water Supply Systems
Buildout of the Approved Project would increase the population in the City and SOI by approximately 11,511 residents. Major deficiencies are not anticipated as the City has confirmed that it would have adequate capacity to accommodate the proposed increases in water demands under the buildout of the Approved Project.

Additionally, individual projects would be subject to City permits, fees, and applications in order to ensure that these projects would not pose burdens on the existing infrastructure. No significant impacts from the construction or expansion of water facilities or water supplies are anticipated.

Storm Drainage Systems
Portions of the City and SOI are vulnerable to flooding. To prevent and control flooding, the City prepared a Strom Drain Master Plan which provided three deficiency remedies – installing new systems, replacing systems, and installing parallel systems – to prevent and control flooding. The City DWP provides references on the NPDES residential, industrial/commercial, and construction/ Water Quality Management Plan (WQMP) guidelines in order to regulate the types of discharge that enter the storm drain system. Future individual developments built according to the proposed General Plan would also require an assessment of how the project would affect the existing and proposed storm drain system. Funding for drainage facilities would come from development impact fees collected under Chapter 16.23, Development Impact Fees, of the City’s Municipal Code. Therefore, the State and local policies, including the General Plan, as well as the improvements recommended in the Storm Drain Master Plan Update, would reduce the potential impacts of development on the drainage system within the City of Corona.

Solid Waste
Buildout of the General Plan would result in an increase of 63,900 tons per year (approximately 175 tons per day). The two landfills accepting the majority of landfilled solid waste from Corona have a total remaining

CITY PARK REVITALIZATION PROJECT EIR ADDENDUM

CITY OF CORONA

5. Environmental Analysis

Page 158 ends

capacity of 178,177,170 cubic yards and a combined residual daily disposal capacity of 14,817 tons per day.

Additionally, the County of Riverside is required to maintain 15 years’ identified disposal capacity, or have a plan to transform or divert its waste, pursuant to AB 939. There is adequate landfill capacity in the region for solid waste that would be generated by the buildout of the General Plan, and impacts were less than significant.

5.19.2 Impacts Associated with the Proposed Project
Would the project:

Environmental Issues
Condition 1:

Substantial
Change in
Project
Requiring
Major
Revisions
Condition 2:

Substantial
Change in
Circumstances
Requiring
Major
Revisions
Condition 3:

New
Information
Showing New
or Increased
Significant
Effects
Less Than
Significant
Impact/No
Changes or
New
Information
Requiring
Preparation of
an EIR/MND No Impact
a) Require or result in the relocation or
construction of new or expanded water,
wastewater treatment or storm water
drainage, electric power, natural gas, or
telecommunications facilities, the
construction or relocation of which could
cause significant environmental effects?
X
b) Have sufficient water supplies available to
serve the project and reasonably
foreseeable future development during
normal, dry and multiple dry years?
X
c) Result in a determination by the wastewater
treatment provider which serves or may
serve the project that it has adequate
capacity to serve the project’s projected
demand in addition to the provider’s existing
commitments?
X
d) Generate solid waste in excess of state or
local standards, or in excess of the capacity
of local infrastructure, or otherwise impair
the attainment of solid waste reduction
goals?
X
e) Comply with federal, state, and local
management and reduction statutes and
regulations related to solid waste?
X

CITY PARK REVIT A LIZATION PROJECT EIR ADDENDUM

CITY OF CORONA

5. Environmental Analysis
June 2026 Page 159
a) Require or result in the relocation or construction of new or expanded water, wastewater treatment or storm water drainage, electric power, natural gas, or telecommunications facilities, the construction or relocation of which could cause significant environmental effects? Less Than Significant Impact/No Changes or New Information Requiring Preparation of an EIR/MND.

Water
The proposed project would redevelop the existing park with a new community center, sports facilities, aquatics center and pool, play fields, a skate area, a splash pad, a stage and screen area for community events including market/vender spaces, and ornamental landscaping. Water is currently provided to the project site via the City of Corona Department of Water and Power’s water mains, which includes a 48-inch water line along Quarry Street and East Grant Boulevard and a 12-inch water line along Rimpau Avenue, with 8-inch water lines on-site (Corona 2022, 2019b).

Water supply to the City of Corona Department of Water and Power (CDWP) is provided via imported water from the Western Municipal Water District (WMWD), groundwater from two local basins the Temescal Basin and Bedford-Coldwater Basin, and reclaimed water from landscape irrigation and other nonpotable uses (Corona 2021). Potable water would be provided to the new building through connections to the existing water mains. The proposed water system improvements would be designed and constructed in accordance with the California Building Code and CALGreen requirements, such as CALGreen Division 5.3, Water Efficiency and Conservation. Additionally, as discussed in Section 5.19.2(b), the City contains sufficient supplies to provide water services to the City and the proposed project during normal years, single dry years, and five consecutive dry years projected through 2045. Therefore, the proposed project would not require the construction of new or expanded water facilities that could cause significant effects. Impacts would be less than significant.

Accordingly, no new significant impacts or impacts of greater severity than those identified in the 2020 Certified EIR would occur. No changes or new information would require preparation of a supplemental or subsequent EIR.

Wastewater
The proposed project includes the construction of an aquatics center, pool, and splash pad. Wastewater services are provided by the water reclamation providers. CDWP provides wastewater services to the project site. The CDWP wastewater system includes 368 miles of gravity sewer pipes, 14 lift stations and force mains, and 3 wastewater treatment plants (Corona 2021). The three water reclaimant facilities treat up to 15.5 million gallons per day (MGD), and the Western Riverside County Wastewater Authority contains 2.37 MGD of capacity for the City (Corona 2019b).

The proposed project would utilize the existing 8- to 12-inch pipes surrounding the project site (Corona 2022).

As further discussed in Section 5.19.2(c), the proposed project would not substantially increase wastewater.

Wastewater generated at the proposed project would be conveyed to the existing sewer lines within the project site. Therefore, the proposed project would not require the construction of new or expanded wastewater facilities that could cause significant environmental effects. Impacts would be less than significant. Accordingly,

CITY PARK REVITALIZATION PROJECT EIR ADDENDUM

CITY OF CORONA

5. Environmental Analysis

Page 160 ends

no new significant impacts or impacts of greater severity than those identified in the 2020 Certified EIR would occur. No changes or new information would require preparation of a supplemental or subsequent EIR.

Stormwater Drainage
As discussed in Section 5.10, the proposed project would result in a slight increase in impervious surfaces compared to existing conditions with the construction of the proposed project. The stormwater from the proposed project would be conveyed to existing stormwater drains or to the neighboring storm drain system along roadways, to the storm drain channel/Temescal Wash approximately 0.10 miles northeast. The proposed project would not significantly increase or change the stormwater volume, rate, or pattern. Beyond connecting to the existing stormwater system. Impacts would be less than significant. Accordingly, no new significant impacts or impacts of greater severity than those identified in the 2020 Certified EIR would occur. No changes or new information would require preparation of a supplemental or subsequent EIR.

Electric Power
Electricity is provided by Southern California Edison. The proposed project would connect to existing electric power infrastructure for operation. Although the proposed project would result in a higher electricity demand than existing conditions, the increase would be negligible in Southern California Edison’s capacity. Furthermore, the development of the new concessions buildings and other structures would be required to comply with energy efficiency standards set forth by the California Building Energy Efficiency Standards for Residential Buildings (Title 24, Part 6). Implementation of the proposed project would not result in major construction related to electrical power facilities that could cause significant environmental impacts. Impacts would be less than significant. Accordingly, no new significant impacts or impacts of greater severity than those identified in the 2020 Certified EIR would occur. No changes or new information would require preparation of a supplemental or subsequent EIR.

Natural Gas
Natural gas service is provided by the Southern California Gas Company to the City of Corona. As discussed in Section 5.6, Energy, the natural gas demand by the proposed new facilities would total 2,508,299 kilo-British thermal units per year following buildout of the proposed project. While the proposed project would result in an increase in natural gas demand, the new park facility buildings would be consistent with the requirements of the Building Energy Efficiency Standards and would generally result in a decrease in per capita natural gas consumption. Compliance with these codes would decrease overall reliance on fossil fuels and increase reliance on renewable energy sources for electricity generation. Therefore, operation of the proposed project would be similar to development contemplated in the 2020 Certified EIR. The proposed project would not result in any impacts with respect to natural gas usage and the project would not require the construction of new or expanded natural gas facilities. Therefore, no impact would occur. Accordingly, no new significant impacts or impacts of greater severity than those identified in the 2020 Certified EIR would occur. No changes or new information would require preparation of a supplemental or subsequent EIR.

Telecommunications
The proposed project would not require additional telecommunications facilities as the project site would continue to be served by existing providers in the region. The proposed project would not require off-site

CITY PARK REVIT A LIZATION PROJECT EIR ADDENDUM

CITY OF CORONA

5. Environmental Analysis
June 2026 Page 161
construction or relocation of utilities, and therefore no impact would occur. Accordingly, no new significant impacts or impacts of greater severity than those identified in the 2020 Certified EIR would occur. No changes or new information would require preparation of a supplemental or subsequent EIR. b) Have sufficient water supplies available to serve the project and reasonably foreseeable future development during normal, dry and multiple dry years?
Less Than Significant Impact/No Changes or New Information Requiring Preparation of an EIR/MND. CDWP provides potable water and non-potable water to the project site. Sources of potable water for CDWP includes imported water from the Western Municipal Water District (WMWD), treated groundwater from two local basins the Temescal Basin and Bedford-Coldwater Bason, reclaimed water from landscape irrigation, and other non-portable uses (Corona 2021). According to the City of Corona’s 2020 Urban Water Management Plan, the City has reliable and adequate supplies to meet water demands during normal years, single dry years, and five consecutive dry years projected through 2045. The UWMP discussed having a surplus of water supply in 2045 during a normal year of 7,871 acre-foot per year (AFY) and an excess of 6,643 AFY after five consecutive dry years, thus would have sufficient supplies to prove water for the projected growth of the City and projects.

The proposed community center and aquatics center would increase the demand for water services. The average pool water evaporation rate is about a quarter of an inch of water per day (American Leak Detection 2022).

Assuming two pools, the outdoor water use needed to account for pool water evaporation is approximately 3,111 gpd. Additionally, as seen in Table 15, Proposed Increase in Portable Water Demand, the community center would increase daily water demand by 32,433gpd, for a total increase of approximately 35,544 gpd. The proposed project is expected to increase water daily water demand by 0.10 AFY,6 which would be considered a negligible increase compared to projected excess supplies in water supply.

The proposed project’s water demand would be captured by the projected demand of the UWMP. Furthermore, development of the proposed project would be required to comply with the provisions of CALGreen 6 1 AFY = 325,851 gallons
32,433 ÷ 325,851 = 0.10 AFY
Table 15 Proposed Increase in Potable Water Demand
Category
Demolished
(SF)
New Facility
(SF)
Net Increase
(SF)
Water Demand Rate
gpd/SF1
Daily Water
Demand (gpd)
Community Center 3,100 60,000 56,090 0.572 32,433
Aquatics Center and
Swimming Pool 19,840 — — 3,1113
Total 3,100 79,840 56,090 — 35,544
Source: CAPCOA 2022
Notes: gpd = gallons per day; SF = square feet
1 350 days per year is used to convert gallons per year to gallons per day. 2 The rate for “Government (Civic Center)” is used. 3 Evaporation off the surface of the pool is calculated by multiplying 0.021 ft/day (half an inch a day) by the surface area of the pool (19,840 square feet) for a total of 416 cubic feet per day of water lost to evaporation. 416 cubic feet per day is 3,111 gpd.

CITY PARK REVITALIZATION PROJECT EIR ADDENDUM

CITY OF CORONA

5. Environmental Analysis

Page 162 ends

Division 5.3, Water Efficiency and Conservation, including those of Sections 5.303, Indoor Water Use, and

5.304, Outdoor Water Use. Additionally, the proposed aquatics center and fountain would be consistent with the 2020 UWMP policies, which prohibit the overfilling of pools and require the installation of recirculating pumps to limit the waste of water. Based on the City of Coronas UWMP, the City contains adequate water supplies to meet the water demands of the proposed project and the City during normal, dry, and multiple dry years. Impacts would be less than significant. Accordingly, no new significant impacts or impacts of greater severity than those identified in the 2020 Certified EIR would occur. No changes or new information would require preparation of a supplemental or subsequent EIR. c) Result in a determination by the waste water treatment provider, which serves or may serve the project that it has adequate capacity to serve the project’s projected demand in addition to the provider’s existing commitments?
Less Than Significant Impact/No Changes or New Information Requiring Preparation of an EIR/MND. The proposed project would redevelop the existing park with a new community center, sports facilities, aquatics center and pool, play fields, a skate area, a splash pad, a stage and screen area for community events including market/vender spaces, and ornamental landscaping. Wastewater services are provided by CDWP to the project site. The CDWP wastewater system includes 368 miles of gravity sewer pipes, 14 lift stations and force mains, and three wastewater treatment plants (Corona 2021). The three water reclaimant facilities treat up to 15.5 million gallons per day (MGD), and the Western Riverside County Wastewater Authority provides 2.37 MGD of capacity for the City (Corona 2019b). The proposed project would utilize the existing 8- to 12-inch pipes surrounding the project site (Corona 2022). The stormwater and wastewater flows from the project site are expected to marginally increase but would not be enough to require the construction of new or expanded wastewater treatment facilities. Though the proposed project will increase employee capacity at the project site, which would increase wastewater generation, the increase would not overburden the wastewater treatment provider that serves the site. Therefore, impacts would be less than significant.

Accordingly, no new significant impacts or impacts of greater severity than those identified in the 2020 Certified EIR would occur. No changes or new information would require preparation of a supplemental or subsequent EIR.
d) Generate solid waste in excess of state or local standards, or in excess of the capacity of local infrastructure, or otherwise impair the attainment of solid waste reduction goals? Less Than Significant Impact/No Changes or New Information Requiring Preparation of an EIR/MND. During construction, the proposed project would generate some demolition debris from clearance and waste debris. Construction solid waste generation would be minimal due to the demolition of small structures and, CALGreen Section 5.408, Construction Waste Reduction, Disposal, and Recycling, requires that at least 65 percent of the nonhazardous construction and demolition waste from nonresidential construction operations be recycled and/or salvaged for reuse.

The City of Corna contrasts with Waste Management Inc. (WMI) for trash and recycling services. The proposed project site would continue to operate as a park facility. However, the proposed project would construct a larger community center with an anticipated increase in events and an aquatics center, which would increase the amount of solid waste generated by Corona City Park. Solid waste generated in the City of Corona is

CITY PARK REVIT A LIZATION PROJECT EIR ADDENDUM

CITY OF CORONA

5. Environmental Analysis
June 2026 Page 163
transported to two landfills, the El Sobrante and Olinda Alpha Landfill (Cal Recycle 2024). The El Sobrante Landfill in the City of Corona will receive the solid waste from the project site. The Sobrante Landfill contains a remaining capacity of 143,977,170 cubic years as of April 2018.

Table 16 Landfill Capacity
Landfill Name
Current Remaining
Capacity
(tons) 1
Maximum Daily
Disposal Capacity
(tons)
Average Daily
Disposal
(tons)2
Residual Daily
Disposal Capacity
(tons)
Annual
Disposal
Capacity
(tons)
Estimated
Close Date
El Sobrante
Landfill 143,977,170 16,054 5,599 10,455 3,136,500 2051 Sources: CalRecycle 2019b, 2019c.
1 A Volume-to-Weight conversion rate of 2,000 lbs/cubic yard (1 tons/cubic yard) for “Compacted - MSW Large Landfill with Best Management Practices” is used as per CalRecyle’s 2016 Volume-to-Weight Conversion Factors, https://www.epa.gov/sites/production/files/201604/documents/volume_to_weight_conversion_factors_memorandum_04192016_508fnl.pdf. 2 Average daily disposal is calculated based on 300 operating days per year. The facility is open six days per week, Monday through Saturday, except certain holidays.

Table 17 Proposed Increase in Solid Waste Generation
Category
Demolished
(SF)
Expanded
(SF)
New Facility
(SF)
Generation Rate
(tons/1,000 SF/year)
Total
(tons/year)
Community Center 3,100 60,000 56,090 5.71 320
Aquatics Center
and
Swimming
Pool
19,840 5.72 113
Total 3,100 79,840 56,090 — 433
Source: CAPCOA 2022q and 2022b.

Notes: SF = square feet
1 The rate for “Government (Civic Center)” is used. 2 The rate for “Recreational Swimming Pool” is used.

As demonstrated in Table 16 and Table 17, there is adequate landfill capacity for the proposed project’s forecast solid waste, and project development would not require additional landfill capacity at the landfill serving the City. The total amount of solid waste expected to be generated under the proposed project would be minimal compared to the annual disposal capacity of the landfill serving the City. Therefore, impacts would be less than significant. Accordingly, no new significant impacts or impacts of greater severity than those identified in the 2020 Certified EIR would occur. No changes or new information would require preparation of a supplemental or subsequent EIR.
e) Comply with federal, state, and local management and reduction statutes and regulations related to solid waste?
Less Than Significant Impact/No Changes or New Information Requiring Preparation of an EIR/MND. Solid waste would be generated during the construction and operation of the proposed project.

The proposed project would comply with all regulations pertaining to solid waste, such as the California Integrated Waste Management Act and local recycling and waste programs. The proposed project would comply

CITY PARK REVITALIZATION PROJECT EIR ADDENDUM

CITY OF CORONA

5. Environmental Analysis

Page 164 ends

with all applicable laws and regulations and make every effort to reuse and/or recycle the construction debris that would otherwise be taken to a landfill. Section 5.408 of CALGreen requires that at least 65 percent of the nonhazardous construction and demolition waste from nonresidential construction operations be recycled and/or salvaged for reuse. Hazardous waste, such as paint used during construction, would be disposed of only at facilities permitted to receive them in accordance with local, state, and federal regulations. The proposed project would comply with all applicable federal, state, and local statutes and regulations related to solid waste disposal. Therefore, impacts would be less than significant. Accordingly, no new significant impacts or impacts of greater severity than those identified in the 2020 Certified EIR would occur. No changes or new information would require preparation of a supplemental or subsequent EIR.

5.19.3 Adopted Mitigation Measures Applicable to the Proposed Project No mitigation measures related to utilities and service systems were outlined in the 2020 Certified EIR.

CITY PARK REVIT A LIZATION PROJECT EIR ADDENDUM

CITY OF CORONA

5. Environmental Analysis
June 2026 Page 165

5.20 WILDFIRE

5.20.1 Summary of Impacts Identified in the Program EIR The 2020 Certified EIR concluded that the Approved Project resulted in less than significant impacts to wildfire.

Emergency Evacuation Plan
The City of Corona has prepared an Emergency Operations Plan (EOP) and Local Hazard Mitigation Plan (LHMP) to ensure the effective allocation of resources for the maximum benefit during a time of emergency, and to identify local hazards and provide mitigation measures to address these hazards, respectively. Buildout of the Approved Project would not result in substantial changes to the circulation patterns or emergency access routes in the City or SOI identified in the City’s LHMP and EOP. The City also has established evacuation plans and protocols to ensure the safe and orderly notification and evacuation of people in Corona should the need arise. Future development would be required to comply with applicable local and State standards, fire and building codes, and to ensure adequate access project would be reviewed by the CFD prior to approval.

Adherence to local and State policies would reduce impacts to less than significant.

Exacerbate Wildfire Risk
The City of Corona and its SOI are vulnerable to and at significant risk of wildfires. The City has approximately 9,300 housing units and 3 million square feet of office, commercial, and industrial buildings in the very high FHSZ. Development associated with the buildout of the General Plan would result in new development within the wildland-urban interface (WUI) and would place more assets in the very high FHSZ. Future development would be required to adhere to state and local codes (California Fire Code, CAL FIRE fire safe design requirements, City Fire and Public Works Standards, and other standards). Because development in the WUI presents challenges for fire protection and suppression, development in these areas are required to abide by the CFD’s Structure Protection Plan (SPP), which addresses fuel modification requirements. With adherence to these building practices and fuel modification requirements in the SPP, development associated with the General Plan would not exacerbate risk.

Associated Infrastructure
Buildout of the General Plan would result in additional infrastructure, including roadways and transmission lines, in undeveloped areas of the City and SOI in order to serve new development. Some of this infrastructure would be placed with the very high FHSZ. To protect development in the very high FHSZ, the City requires adherence to a wide range of state and local codes (California Fire Code, CAL FIRE fire safe design requirements, City Fire and Public Works Standards, and other standards), including SPP requirements for new infrastructure. With adherence to these building practices and fuel modification requirements in the SPP, infrastructure associated with the General Plan buildout would not exacerbate risk.

Expose People or Structures to Significant Risk
Wildfires on hillsides can create hazards in the form of debris or mudflows, which occurs most frequently on hillsides that have little to no vegetation and are most common following wildfires. As identified above, to

CITY PARK REVITALIZATION PROJECT EIR ADDENDUM

CITY OF CORONA

5. Environmental Analysis

Page 166 ends

protect development in the very high FHSZ, with adherence to these building practices and fuel modification requirements in the SPP, impacts associated with the General Plan buildout would not exacerbate risk.

Areas of the city adjacent to the Santa Ana River, Temescal Creek, and Mabey Canyon Wash are designated as Flood Zone A, a 100-year flood zone, and other areas of the city are within a 500-year flood zone. Future development would be required to meet federal floodplain regulations, including that the lowest floor of the structure is raised above a 100-year based flood elevation. Therefore, impacts to the exposure of structures or people to flooding as a result of post-fire slope instability would be less than significant.

Marginally stable slopes may be subject to landslides caused by earthquakes. The terrain of the City is varied, ranging from relatively flat to hilly. Grading permits for hillside developments must have an engineering geology report prepared and submitted to the City. Therefore, impacts as a result of post-fire slope instability would be less than significant.

5.20.2 Impacts Associated with the Proposed Project
If located in or near state responsibility areas or lands classified as very high fire hazard severity zones, would the project:

Environmental Issues
Condition 1:

Substantial
Change in
Project
Requiring
Major
Revisions
Condition 2:

Substantial
Change in
Circumstances
Requiring
Major
Revisions
Condition 3:

New
Information
Showing New
or Increased
Significant
Effects
Less Than
Significant
Impact/No
Changes or
New
Information
Requiring
Preparation of
an EIR/MND No Impact
a) Substantially impair an adopted emergency
response plan or emergency evacuation
plan?
X
b) Due to slope, prevailing winds, and other
factors, exacerbate wildfire risks, and
thereby expose project occupants to
pollutant concentrations from a wildfire or
the uncontrolled spread of a wildfire?
X
c) Require the installation or maintenance of
associated infrastructure (such as roads,
fuel breaks, emergency water sources,
power lines or other utilities) that may
exacerbate fire risk or that may result in
temporary or ongoing impacts to the
environment?
X
d) Expose people or structures to significant
risks, including downslope or downstream
flooding or landslides, as a result of runoff,
post-fire slope instability, or drainage
changes?
X

CITY PARK REVIT A LIZATION PROJECT EIR ADDENDUM

CITY OF CORONA

5. Environmental Analysis
June 2026 Page 167
a) Substantially impair an adopted emergency response plan or emergency evacuation plan? Less Than Significant Impact/No Changes or New Information Requiring Preparation of an EIR/MND. The project site is located within a LRA as a non-Very High Fire Hazard Severity Zone (VHFHSZ) (Cal Fire 2024). The project site is not located in a SRA or lands classified as VHFHSZ. The nearest FHSZ is approximately 2.2 miles southeast of the project site and designated as a VHFHSZ in a SRA. The project site does not abut a VHFHSZ and is not located within the Wildlife Urban Interface (SILVIS 2019).

Additionally, the project site is located within an urbanized, built-out area of the City. Operation of the proposed project would continue to operate as a park and serve nearby residents. The proposed project would follow the appropriate local and regional procedures and policies regarding emergency response and would not interfere with any adopted emergency response or evacuation plan. The project site would accommodate emergency and ingress and egress by emergency vehicles as required by the CFD. All access features are to and must satisfy the City of Corona’s fire code. Compliance with the required fire code would ensure that adequate emergency access is provided. Additionally, as discussed in Section 5.17, Transportation, the proposed project would not physically impede the circulation network and roadways surrounding the park. Therefore, no impact would occur. Accordingly, no new significant impacts or impacts of greater severity than those identified in the 2020 Certified EIR would occur. No changes or new information would require preparation of a supplemental or subsequent EIR.
b) Due to slope, prevailing winds, and other factors, exacerbate wildfire risks, and thereby expose project occupants to pollutant concentrations from a wildfire or the uncontrolled spread of a wildfire?
No Impact. As previously discussed, the project site and surrounding area are flat and in an urbanized area, and there is no wildland susceptible to wildfire on or near the site. The project site is not located within a VHFHSZ. The surrounding area is currently developed, and therefore lacks the vegetation necessary for the uncontrolled spread of a wildfire. Construction activities would be subject to review by CFD to ensure adequate fire protection according to the standards of the Uniform Fire Code and the California Code. Therefore, no impact would occur. Accordingly, no new significant impacts or impacts of greater severity than those identified in the 2020 Certified EIR would occur. No changes or new information would require preparation of a supplemental or subsequent EIR.
c) Require the installation or maintenance of associated infrastructure (such as roads, fuel breaks, emergency water sources, power lines or other utilities) that may exacerbate fire risk or that may result in temporary or ongoing impacts to the environment? No Impact. The project site is in an urbanized area and is served by existing utility infrastructure, including water, wastewater, and power. The proposed project is located within an urbanized area and would not require the installation or maintenance of associated infrastructure that may exacerbate fire risk. Therefore, no impact would occur. Accordingly, no new significant impacts or impacts of greater severity than those identified in the 2020 Certified EIR would occur. No changes or new information would require preparation of a supplemental or subsequent EIR.

CITY PARK REVITALIZATION PROJECT EIR ADDENDUM

CITY OF CORONA

5. Environmental Analysis

Page 168 ends

d) Expose people or structures to significant risks, including downslope or downstream flooding or landslides, as a result of runoff, post-fire slope instability, or drainage changes? No Impact. The project site is in an urbanized area and there is no wildland susceptible to wildfire on or near the site. CAL FIRE does not classify any adjacent areas as a VHFHSZ. Additionally, according to the FEMA flood zone map, the project site is located within Zone X, an area of minimal flood hazard (FEMA 2009). The project site and surrounding area are generally flat and would have low potential of post-fire slope instability.

Therefore, no impact would occur. Accordingly, no new significant impacts or impacts of greater severity than those identified in the 2020 Certified EIR would occur. No changes or new information would require preparation of a supplemental or subsequent EIR.

5.20.3 Adopted Mitigation Measures Applicable to the Proposed Project No mitigation measures related to wildfire were outlined in the 2020 Certified EIR.

CITY PARK REVIT A LIZATION PROJECT EIR ADDENDUM

CITY OF CORONA

5. Environmental Analysis
June 2026 Page 169

5.21 MANDATORY FINDINGS OF SIGNIFICANCE
Environmental Issues
Condition 1:

Substantial
Change in
Project
Requiring
Major
Revisions
Condition 2:

Substantial
Change in
Circumstances
Requiring
Major
Revisions
Condition 3:

New
Information
Showing New
or Increased
Significant
Effects
Less Than
Significant
Impact/No
Changes or
New
Information
Requiring
Preparation of
an EIR/MND No Impact
a) Does the project have the potential to
substantially degrade the quality of the
environment, substantially reduce the
habitat of a fish or wildlife species, cause a
fish or wildlife population to drop below selfsustaining levels, threaten to eliminate a plant or animal community, substantially
reduce the number or restrict the range of a
rare or endangered plant or animal or
eliminate important examples of the major
periods of California history or prehistory?
X
b) Does the project have impacts that are
individually limited, but cumulatively
considerable? (“Cumulatively considerable”
means that the incremental effects of a
project are considerable when viewed in
connection with the effects of past projects,
the effects of other current projects, and the
effects of probable future projects.)
X
c) Does the project have environmental effects
which will cause substantial adverse effects
on human beings, either directly or
indirectly?
X
a) Does the project have the potential to substantially degrade the quality of the environment, substantially reduce the habitat of a fish or wildlife species, cause a fish or wildlife population to drop below self-sustaining levels, threaten to eliminate a plant or animal community, substantially reduce the number or restrict the range of a rare or endangered plant or animal or eliminate important examples of the major periods of California history or prehistory? Less Than Significant Impact/ No Changes or New Information Requiring Preparation of an EIR/MND. The proposed project would not result in impacts beyond what was previously analyzed in the 2020 Certified EIR. The geographic range and severity of impacts to biological resources resulting from the proposed project would be similar to those that would result from implementation of the Approved Project.

The proposed project would not result in a significant impact to biological resources, consistent with the Approved Project, and mitigation measures BIO-1, BIO-2, BIO-3, and BIO-4 would ensure impacts to biological resources are reduced. The proposed project would incorporate all applicable mitigation measures identified in 2020 Certified EIR as discussed in Sections 5.3, Air Quality, 5.4, Biological Resources, 5.5, Cultural Resources, 5.7, Geology and Soils, , and 5.18, Tribal Cultural Resources, above. The proposed project would not result

CITY PARK REVITALIZATION PROJECT EIR ADDENDUM

CITY OF CORONA

5. Environmental Analysis

Page 170 ends

in any new impacts or substantially increase the severity of previously disclosed impacts related to biological, cultural, paleontological, or tribal cultural resources. Therefore, preparation of supplemental or subsequent EIR is not required by CEQA.
b) Does the project have impacts that are individually limited, but cumulatively considerable? (“Cumulatively considerable” means that the incremental effects of a project are considerable when viewed in connection with the effects of past projects, the effects of other current projects, and the effects of probable future projects.)?
Less Than Significant Impact/ No Changes or New Information Requiring Preparation of an EIR/MND. Changes proposed by the proposed project compared to the Approved Project would not result in any new cumulatively considerable impacts or substantially increase the severity of previously disclosed cumulatively considerable impacts. The 2020 Certified EIR addresses cumulative impacts in accordance with CEQA Guidelines Section 15130. Pursuant to CEQA Guidelines Section 15130 (b)(1), the information used in an analysis of cumulative impacts should come from one of two sources:
1) A list of past, present, and probable future projects producing related cumulative impacts, including, if necessary, those projects outside the control of the agency; or 2) A summary of projections contained in an adopted general plan or related planning document designed to evaluate regional or area-wide conditions.

The cumulative impacts identified in the 2020 Certified EIR used method No. 2. As discussed previously in this addendum, the proposed project would have no impact, or a less than significant impact/no changes as compared to the Approved Project. Therefore, all impacts are individually limited and would not result in any new cumulatively significant impacts compared to the Approved Project. Impacts would be less than significant, and the proposed project would not generate a new cumulatively considerable impact. The preparation of supplemental or subsequent EIR is not required by CEQA. c) Does the project have environmental effects which will cause substantial adverse effects on human beings, either directly or indirectly?
Less Than Significant Impact/ No Changes or New Information Requiring Preparation of an EIR/MND. The proposed project would not result in an increase of residents compared to the Approved Project. The proposed project would remain a locally serving park for the residents of the City of Corona.

The proposed project would comply with applicable local, state, and federal laws governing general welfare and environmental protection. The implementation of the required mitigation measures specified in the Approved Project, and incorporated into this addendum would reduce impacts to less than significant.

Changes proposed by the proposed project to the Approved Project would not result in any new substantial adverse impacts or substantially increase the severity of previously disclosed adverse impacts on human beings, either directly or indirectly. Therefore, a less than significant impact would occur and preparation of supplemental or subsequent EIR is not required by CEQA.

June 2026 Page 171

6. Findings
 As summarized below, and for the reasons described in Chapter 4, Environmental Analysis, of this Addendum, the City has concluded that the proposed project meets the conditions of CEQA Guidelines Section 15164 and that therefore an Addendum to the 2020 Certified EIR is the appropriate CEQA document to address the proposed project.
 As previously discussed, under CEQA Guidelines Section 15164, an addendum to an EIR may be prepared if only minor technical changes or additions are necessary or none of the conditions described in CEQA Guidelines Section 15162 calling for the preparation of a subsequent EIR have occurred. The following restates the standards set forth in CEQA Guidelines Section 15162 as they relate to the proposed project.

1. No substantial changes are proposed in the project which would require major revisions of the Certified EIR to the involvement of new significant environmental effect or a substantial increase in the severity of previously identified significant effect.

The proposed project would occur within the same boundaries of the project site. The proposed project would redevelop the existing park with a new community center, sports facilities, aquatics center and pool, play fields, a skate area, a splash pad, a stage and screen area for community events including market/vender spaces, and ornamental landscaping. The proposed project does not include a change in land use or additional development that was not previously analyzed in the 2020 Certified EIR. The proposed project includes construction-type activities previously analyzed in the 2020 Certified EIR. The proposed project does not include substantial changes compared to the Approved Project; implementation of the proposed project would not require revisions to the 2020 Certified EIR. The analysis provided in Chapter 4, Environmental Analysis, illustrates that the proposed project would not result in any new or more severe significant impacts than those identified in the 2020 Certified EIR.

2. No substantial changes occur with respect to the circumstances under which the project is undertaken which will require major revisions of the Certified EIR due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects.

Substantial changes have not occurred with respect to the circumstances under which the approved project was undertaken that would require major revisions to the 2020 Certified EIR. Under the Approved Project, the project site is zoned Parks with a land use designation as Open Space Recreational, which allows up park and recreational uses, and therefore, the Approved Project assumed that the project site would serve as a park and recreational use. Implementation of the proposed project would occur within the impact boundaries identified in the 2020 Certified EIR. The proposed project does not include a change in land use or propose

CITY PARK REVITALIZATION PROJECT EIR ADDENDUM

CITY OF CORONA

6. Findings

Page 172 ends

any off-site improvements. Therefore, no proposed changes or revisions to the 2020 Certified EIR are required.

3. No new information of substantial importance, which was not known and could not have been known with the exercise of reasonable diligence at the time the previous EIR was certified as complete or the negative declaration was adopted, shows any of the following:

A. The project will have one or more significant effects not discussed in the previous EIR or negative declaration
The proposed project would be implemented within the impact boundary identified for the Approved Project analyzed in the 2020 Certified EIR. Additionally, the proposed project does not include any land use changes; therefore, the proposed project would not affect the operational conditions analyzed in the 2020 Certified EIR. The construction activities associated with the proposed project would not include new construction equipment, intensity or methods that would substantially increase significant impacts identified in the 2020 Certified EIR.

B. Significant effects previously examined will be substantially more severe than shown in the previous EIR;
Based on the analysis above, the new components in the proposed project would not result in more severe impacts than those identified in the 2020 Certified EIR. All other operational characteristics of the approved project would remain unchanged from those evaluated in the 2020 Certified EIR and subsequent addenda.

C. Mitigation measures or alternatives previously found not to be feasible would in fact be feasible and would substantially reduce one or more significant effects of the project, but the project proponents decline to adopt the mitigation measure or alternative; or Mitigation measures or alternatives previously found not to be feasible at the time the 2020 Certified EIR was prepared have not been identified as feasible. The proposed project would incorporate all applicable mitigation measures from the 2020 Certified EIR. The mitigation measures not applicable to the proposed project would continue to be valid, feasible, and applicable to the Approved Project as refined by in the subsequent addendum.

D. Mitigation measures or alternatives which are considerably different from those analyzed in the previous EIR would substantially reduce one or more significant effects on the environment, but the project proponents decline to adopt the mitigation measure or alternative.

No new mitigation measures or alternatives were identified. The existing applicable mitigation measures from the 2020 Certified EIR would reduce impacts to the feasible extent possible.

June 2026 Page 173

7. List of Preparers

CITY OF CORONA (LEAD AGENCY)
Rachel McLure, CIP Supervisor

PLACEWORKS (CEQA CONSULTANT)
Malia Durand, Principal
Emma Haines, Associate I
Natalie Phan, Planner
Angel Castro, Planner
Nicole Vermilion, Principal – Air Quality and Greenhouse Gas Emissions Emily Parks, Associate I – Air Quality and Greenhouse Gas Emissions Chris Shields, Senior Associate II, Noise & Vibration
Cary Nakama, Graphics Specialist

CITY PARK REVITLIZATION PROJECT ADDENDUM

CITY OF CORONA

7. List of Preparers

Page 174 ends

This page intentionally left blank.

June 2026 Page 175

8. References
Bay Area Air Quality Management District (BAAQMD). 2023, May. California Environmental Quality Act Air Quality Guidelines. https://www.baaqmd.gov/plans-and-climate/california-environmentalquality-act-ceqa/updated-ceqa-guidelines.

CalEPA. 2025a, November 10 (accessed). Solid Waste Disposal Sites Identified by the Water Board with Waste Constituents above Hazardous Waste Levels Outside the Waste Management Unit. ———. 2025b, November 10 (accessed). List of Active Cease and Desist Orders and Cleanup and Abatement Orders from the Water Board.

California Air Pollution Control Officers Association (CAPCOA). 2022. Generation Rates. https://view.officeapps.live.com/op/view.aspx?src=https%3A%2F%2Fwww.caleemod.com%2Fdoc uments%2Fuser-guide%2F08_Appendix%2520G_v2022.1.1.3.xlsx&wdOrigin=BROWSELINK California Air Resources Board (CARB). 2005, April. Air Quality and Land Use Handbook: A Community Health Perspective. https://www.aqmd.gov/docs/default-source/ceqa/handbook/california-airresources-board-air-quality-and-land-use-handbook-a-community-health-perspective.pdf. ———. 2022, December. 2022 Scoping Plan for Achieving Carbon Neutrality. https://ww2.arb.ca.gov/sites/default/files/2023-04/2022-sp.pdf. ———. 2024, June 19 (accessed). Area Designations Maps/State and National. https://ww2.arb.ca.gov/resources/documents/maps-state-and-federal-area-designations.

California Department of Forestry and Fire Protection (CalFire). 2024, April 1. https://experience.arcgis.com/experience/03beab8511814e79a0e4eabf0d3e7247/ California Department of Conservation (DOC). 2024a, March 22 (accessed). The Farmland Mapping and Monitoring Program. https://maps.conservation.ca.gov/agriculture/#webmaps ———. 2024b, April 21 (accessed). Alquist-Priolo Earthquake Fault Zones. https://www.conservation.ca.gov/cgs/alquist-priolo.
———. 2024c, April 15 (accessed). Fault Activity Map. https://maps.conservation.ca.gov/cgs/fam/ ———. 2024d, April 27 (accessed). Mineral Lands Classification. https://maps.conservation.ca.gov/cgs/informationwarehouse/index.html?map=mlc.

California Department of Forestry and Fire Protection (CAL FIRE). 2024, April 1 . Fire Hazard Severity Zones Maps. https://experience.arcgis.com/experience/03beab8511814e79a0e4eabf0d3e7247/

CITY PARK REVITLIZATION PROJECT EIR ADDENDUM

CITY OF CORONA

8. References

Page 176 ends

California Department of Transportation (Caltrans). 2024, April 8 (accessed). California State Scenic Highway System Map. https://caltrans.maps.arcgis.com/apps/ webappviewer/index.html?id=465dfd3d807c46cc8e8057116f1aacaa.

California Department of Water Resources (CDWR). 2024a, May 3. SGMA Data Viewer. https://sgma.water.ca.gov/webgis/?appid=SGMADataViewer#boundaries. ———. 2024b, May 13 (accessed). Dam Breach Inundation Map. https://fmds.water.ca.gov/webgis/?appid=dam_prototype_v2 Corona, City of. 2024a, March 22 (accessed). Property Information – Geography Information Services. https://corgis.coronaca.gov/apps/propertyinformation/.
———. 2024b. May 3. City Park Master Plan. https://www.citypark.coronaca.gov/. ———. 2024c. April 15 (accessed). Chapter 15.36 – Grading Regulations. https://ca.water.usgs.gov/land_subsidence/california-subsidence-areas.html ———. 2024d. August 6 (accessed). Chapter 12.22 – Community Urban Forest and Landscape Guidelines. https://codelibrary.amlegal.com/codes/corona/latest/corona_ca/0-0-0-42777 ———. 2024e. August 6 (accessed). Urban Forest Management Plan. chromeextension://efaidnbmnnnibpcajpcglclefindmkaj/https://www.coronaca.gov/home/showpublishedd ocument/22458/637890970605900000.
———. 2023. 2020-204- General Plan.
https://www.coronaca.gov/home/showpublisheddocument/25479/638494039032370000 ———. 2022. City of Corona GIS Maps and Data - Sewer Gravity Main. https://giscityofcorona.opendata.arcgis.com/datasets/cityofcorona::sewer2/explore?layer=11&location=33.874801%2C-117.555952%2C16.00. ———. 2021, June 16. 2020 Urban Water Management Plan. chromeextension://efaidnbmnnnibpcajpcglclefindmkaj/https://www.coronaca.gov/home/showpublishedd ocument/20292/637612402713400000.
———. 2019a, November 22. Standards of Coverage and Headquarters Services Assessment Volume 1 of 2 – Technical Report.
https://www.coronaca.gov/home/showpublisheddocument/17206/637102948578300000 ———. 2019b, December. Corona General Plan Technical Update. https://www.coronaca.gov/home/showpublisheddocument/17290/637122799157100000 ———. 2015. Historic Markers. https://www.coronaca.gov/government/departments/communitydevelopment/planning-division/historical-markers.

CITY PARK REVITALIZATION PROJECT EIR ADDENDUM

CITY OF CORONA

8. References
June 2026 Page 177
———. 2014, December 15. City of Corona – Maintenance Services Department – Approved Street Tree List. chromeextension://efaidnbmnnnibpcajpcglclefindmkaj/https://www.coronaca.gov/home/showpublishedd ocument/4561/636342430829570000
Department of Toxic Substances Control (DTSC). 2025a. EnviroStor. http://www.envirostor.dtsc.ca.gov/public/.
———. 2025b. Hazardous Waste Facilities Subject to Corrective Action.

Federal Emergency Agency (FEMA). 2008, August 28.
https://msc.fema.gov/portal/search?AddressQuery=930%20E%206th%20St%2C%20Corona%2C %20Ca%2092879%20.

International Dark-Sky Association (IDA). 2020. Outdoor Lighting Basics. https://www.darksky.org/ourwork/lighting/lighting-for-citizens/lighting-basics/.

National Park Service (NPS). 2024, March (accessed). National Register of Historic Places. https://www.nps.gov/maps/full.html?mapId=7ad17cc9-b808-4ff8-a2f9-a99909164466.

Office of Environmental Health Hazard Assessment (OEHHA). 2015, February. Air Toxics Hot Spots Program Risk Assessment Guidelines. Guidance Manual for Preparation of Health Risk Assessments. http://oehha.ca.gov/air/hot_spots/2015/2015GuidanceManual.pdf.

Peirce, R. (2004). Low frequency noise criteria for concerts. 29. 32-34.

RWDI. (2025). Amphitheater Events – Noise Impact Predictions Corona City Park. April 14th.

Southern California Association of Governments (SCAG). 2024, April 14. Connect SoCal Plan: The 2024– 2050 Regional Transportation Plan / Sustainable Communities Strategy of the Southern California Association of Governments. https://www.connectsocal.org/Pages/Connect-SoCal-Final-Plan.aspx.

South Coast Air Quality Management District (South Coast AQMD). 1993. California Environmental Quality Act Air Quality Handbook.
———. 2008, July. Final Localized Significance Threshold Methodology. https://www.aqmd.gov/docs/default-source/ceqa/handbook/localized-significancethresholds/final-lst-methodology-document.pdf. ———. 2010, September 28. Minutes for the GHG CEQA Significance Threshold Stakeholder Working Group #15. http://www.aqmd.gov/docs/default-source/ceqa/handbook/greenhouse-gases-(ghg)- ceqa-significance-thresholds/year-2008-2009/ghg-meeting-15/ghg-meeting-15-minutes.pdf. ———. 2011. Fact Sheet for Applying CalEEMod to Localized Significance Thresholds. http://www.aqmd.gov/docs/default-source/ceqa/handbook/localized-significancethresholds/caleemod-guidance.pdf.

CITY PARK REVITLIZATION PROJECT EIR ADDENDUM

CITY OF CORONA

8. References

Page 178 ends

———. 2022, December. Final 2022 Air Quality Management Plan. https://www.aqmd.gov/docs/default -source/clean-air-plans/air-quality-management-plans/2022-air-quality-management-plan/final -2022-aqmp/final-2022-aqmp.pdf?sfvrsn=16.
———. 2023, March (revised). South Coast AQMD Air Quality Significance Thresholds. https://www.aqmd.gov/docs/default-source/ceqa/handbook/south-coast-aqmd-air-quality -significance-thresholds.pdf?sfvrsn=25.

Spatial Analysis For Conservation and Sustainability (SILVIS) Lab. 2019, May 17. Wildland Urban Interface. https://www.arcgis.com/home/webmap/viewer.html?layers=a4985d64969743db8feddf01c96c9435 State Water Resources Control Board (SWRCB). 2025. GeoTracker. http://geotracker.waterboards.ca.gov/.

United States Geological Survey (USGS). 2024, April 15 (accessed). Areas of Land Subsidence in California. https://ca.water.usgs.gov/land_subsidence/california-subsidence-areas.html.

United States Census. 2023, April 8 (accessed). QuickFacts. https://www.census.gov/quickfacts/fact/table/coronacitycalifornia/PST045222.

World Health Organization (WHO). 2022. WHO Global standard for safe listening venues & events.

RESOLUTION NO. 2689
MARD2026-0002 (City Park)
PAGE | 9
EXHIBIT “B”

MITIGATION MONITORING AND REPORTING PROGRAM
FOR

CITY PARK REVITALIZATION PROJECT
June 2026 | Mitigation Monitoring and Reporting Program State Clearinghouse No. 2018081039

CITY PARK REVITALIZATION PROJECT EIR

ADDENDUM
City of Corona
Prepared for:

City of Corona
Contact: Rachel McLure, Senior Project Manager
400 South Vicentia Avenue
Corona, California 92882
951.736.2400
Prepared by:

PlaceWorks
Contact: Malia Durand, Principal
Emma Haines, Associate I
3 MacArthur Place, Suite 1100
Santa Ana, California 92707
714.966.9220
[email protected]
www.placeworks.com

~ PLACEWORKS

CITY PARK REVITALIZTION PROJEC T EIR ADDENDUM MITIGATION MONI TORING AND REPO RTING PROGRAM

CITY OF CORONA
Table of Contents
June 2026 Page i
Section Page

1. INTRODUCTION .............................................................................................................................. 1

1.1 PURPOSE OF MITIGATION MONITORING AND REPORTING PROGRAM ............................ 1

1.2 PROJECT LOCATION .................................................................................................................................... 2

1.3 PROJECT DESCRIPTION .............................................................................................................................. 2

2. MITIGATION MONITORING AND CONDITIONS OF APPROVAL REQUIREMENTS .................. 5

2.1 MITIGATION MEASURES MATRIX .......................................................................................................... 5

2.2 CONDITIONS OF APPROVAL MATRIX ................................................................................................ 16

3. REPORT PREPARATION ............................................................................................................. 19

3.1 LIST OF PREPARERS .................................................................................................................................... 19 List of Tables
Table Page
Table 1 Mitigation Monitoring Requirements ................................................................................................ 6 Table 2 Conditions of Approval Requirements ........................................................................................... 17

CITY PARK REVITALIZTION PROJEC T EIR ADDENDUM MITIGATION MONI TORING AND REPORTING PROGRAM

CITY OF CORONA
Table of Contents
Page ii PlaceWorks
This page intentionally left blank.

June 2026 Page 1

1. Introduction

1.1 PURPOSE OF MITIGATION MONITORING AND REPORTING

PROGRAM
This Mitigation Monitoring and Reporting Program (MMRP) has been developed to provide a vehicle by which to monitor mitigation measures and conditions of approval outlined in the Addendum to the Draft Environmental Impact Report (DEIR), State Clearinghouse No. 2018081039. The Mitigation Monitoring and Reporting Program has been prepared in conformance with Section 21081.6 of the Public Resources Code and Corona Monitoring Requirements. Section 21081.6 states:
(a) When making findings required by paragraph (1) of subdivision (a) of Section 21081 or when adopting a mitigated negative declaration pursuant to paragraph (2) of subdivision (c) of Section 21080, the following requirements shall apply:
(1) The public agency shall adopt a reporting or monitoring program for the changes made to the project or conditions of project approval, adopted in order to mitigate or avoid significant effects on the environment. The reporting or monitoring program shall be designed to ensure compliance during project implementation. For those changes which have been required or incorporated into the project at the request of a responsible agency or a public agency having jurisdiction by law over natural resources affected by the project, that agency shall, if so requested by the lead or responsible agency, prepare and submit a proposed reporting or monitoring program.
(2) The lead agency shall specify the location and custodian of the documents or other material which constitute the record of proceedings upon which its decision is based. (b) A public agency shall provide that measures to mitigate or avoid significant effects on the environment are fully enforceable through permit conditions, agreements, or other measures.

Conditions of project approval may be set forth in referenced documents which address required mitigation measures or, in the case of the adoption of a plan, policy, regulation, or other public project, by incorporating the mitigation measures into the plan, policy, regulation, or project design.
(c) Prior to the close of the public review period for a draft environmental impact report or mitigated negative declaration, a responsible agency, or a public agency having jurisdiction over natural resources affected by the project, shall either submit to the lead agency complete and detailed performance objectives for mitigation measures which would address the significant effects on the environment identified by the responsible agency or agency having jurisdiction over natural resources affected by the project, or refer the lead agency to appropriate, readily available guidelines or reference documents. Any mitigation measures submitted to a lead

CITY PARK REVITALIZTION PROJECT EIR ADDENDUM MITIGATION MONITORING AND REPORTING PROGRAM

CITY OF CORONA

1. Introduction

Page 2 ends

agency by a responsible agency or an agency having jurisdiction over natural resources affected by the project shall be limited to measures which mitigate impacts to resources which are subject to the statutory authority of, and definitions applicable to, that agency. Compliance or noncompliance by a responsible agency or agency having jurisdiction over natural resources affected by a project with that requirement shall not limit the authority of the responsible agency or agency having jurisdiction over natural resources affected by a project, or the authority of the lead agency, to approve, condition, or deny projects as provided by this division or any other provision of law.

CEQA requires that a reporting or monitoring program be adopted for the conditions of project approval that are necessary to mitigate or avoid significant effects on the environment (Public Resources Code 21081.6). The mitigation monitoring and reporting program is designed to ensure compliance with adopted mitigation measures during implementation of the Approved Project.

The mitigation measures presented below are applicable to the Corona City Park Revitalization Project (proposed project).

1.2 PROJECT LOCATION
Corona City Park (project site) is located at 930 East 6th Street in the City of Corona, which is in the northwestern corner of Riverside County. The project site is 19.6 acres and consists of two Assessor’s Parcel Numbers (APNs): 117-310-001-2 and 117-301-010-2.

Regional access to the project site is provided by State Route (SR) 91 located 0.20 miles to the north and Interstate 15 (I-15) located approximately 0.40 miles to the east. The project site is bounded by Quarry Street, residential homes, and the Corona Community Veterinary Hospital to the north; Rimpau Avenue and the Municipal Plunge to the east; East 6th Street to the south; and Grand Boulevard, residential uses, vehiclemechanic shops, and commercial uses to the west.

1.3 PROJECT DESCRIPTION
The Approved Project is described in the City of Corona’s General Plan Technical Update EIR, which was certified on June 3, 2020. The General Plan is the City’s policy and implementation framework that guides the long-term growth and improvement of Corona for the next 20 or more years. Under the Approved Project in the General Plan, the project site is zoned Parks with a land use designation as Open Space Recreational, which allows for park and recreational uses. Therefore, the Approved Project assumed that the project site would serve as a park and recreational use.

The project site encompasses approximately 19.6 acres and is located at the northwest corner of East 6th Street and Rimpau Avenue in the City of Corona. The project site currently operates as Corona City Park and includes open fields, basketball courts, paved play areas, playground structures, parking lots, internal circulation routes, a skate park, pool buildings, and a YMCA facility. The proposed project would redevelop Corona City Park with a new aquatics center in the northeastern portion of the site; a new parking lot in the southeastern portion

CITY PARK REVITALIZTION PROJECT EIR ADDENDUM MITIGATION MONI TORING AND REPO RTING PROGRAM

CITY OF CORONA

1. Introduction
June 2026 Page 3
of the site; a centrally located community lawn (“Community Canvas”) with a community center building to the east; a new playground structure replacing the existing playground and a new splash pad to the west of the community lawn; replacement restrooms and parking areas on the western portion of the site; and relocated basketball courts with a new pump track surrounding them. An additional parking lot would be located in the northwestern portion of the site. The proposed project would also include new walkways and ornamental landscaping throughout the project site.

CITY PARK REVITALIZTION PROJECT EIR ADDENDUM MITIGATION MONITORING AND REPORTING PROGRAM

CITY OF CORONA

1. Introduction

Page 4 ends

This page intentionally left blank.

June 2026 Page 5

2. Mitigation Monitoring and Conditions of Approval
Requirements

2.1 MITIGATION MEASURES MATRIX
Project-specific mitigation measures have been categorized in matrix format, as shown in Table 1, Mitigation Monitoring Requirements. The matrix identifies the environmental factor, specific mitigation measures, schedule, and responsible monitor. The mitigation matrix will serve as the basis for scheduling the implementation of, and compliance with, all mitigation measures.

CITY PARK REVITALIZTION PROJEC T EIR ADDENDUM MITIGATION MONI TORING AND REPO RTING PROGRAM

CITY OF CORONA

2. Mitigation Monitoring and Conditions of Approval Requirements Page 6 PlaceWorks Table 1 Mitigation Monitoring Requirements
Mitigation Measure
Responsibility for
Implementation Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
(Date of Compliance)
AIR QUALITY AQ-1 The City of Corona shall require the following identified measures to be incorporated into all appropriate construction documents (e.g., construction management plans) submitted to the City and shall be verified by the City’s Planning Division. Mitigation measures to reduce construction-related emissions shall include: x Require fugitive-dust control measures that exceed SCAQMD’s Rule 403:
- Use of nontoxic soil stabilizers to reduce wind erosion. - Apply water every two and a half hours to active soildisturbing activities, or a minimum of three times per day. - Tarp and/or maintain a minimum of 24 inches of freeboard on trucks hauling dirt, sand, soil, or other loose materials. x Use construction equipment rated by the United States Environmental Protection Agency as having Tier 4 (model year 2008 or newer). Interim or stricter emission limits for all off-road construction equipment, applicable for engines between 50 and 750 horsepower.
x Ensure that construction equipment is properly serviced and maintained to the manufacturer’s standards.
x Limit nonessential idling of construction equipment to no more than five consecutive minutes.
x Limit onsite vehicle travel speeds on unpaved roads to 25 miles per hour.
x Install wheel washers for all exiting trucks or wash off all trucks and equipment leaving the project area.

City of Corona and Construction Contractor
Technical Assessment: Prior to and During Construction Activities City of Corona Planning Division
BIOLOGICAL RESOURCES BIO-1 Bat Habitat Assessment and Management Plan. If tree removal and/or building demolition will occur as part of the Project, a focused bat habitat assessment will be conducted by City of Corona Planning Division in consultation with a Qualified Biologist Prior to and During Construction Activities
City of Corona Planning Division

CITY PARK REVITALIZTION PROJEC T EIR ADDENDUM MITIGATION MONI TORING AND REPO RTING PROGRAM

CITY OF CORONA

2. Mitigation Monitoring Requirements
June 2026 Page 7
Table 1 Mitigation Monitoring Requirements
Mitigation Measure
Responsibility for
Implementation Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
(Date of Compliance)
a bat biologist prior to commencement of tree removal and/or building demolition activities. If the bat biologist determines that only tree roosting habitat is present, then a Bat Management Plan will not be required. If the bat biologist determines that structure habitat is present, then a Bat Management Plan shall be prepared by a qualified bat biologist prior to the commencement of Project-related activities (including, but not limited to, structure removal or demolition, tree removal, grading, and vegetation removal) that will include specific avoidance and minimization measures to reduce impacts to roosting bats. The project-specific Bat Management Plan may include any of the following as necessary and appropriate: additional habitat assessments of inaccessible areas that would be directly or indirectly impacted during Project activities, emergence and/or acoustic surveys for bats during the maternity season (April 1 through August 31) to assess the potential for bat maternity roosts in the project site, and pre-construction surveys for roosting bats including acoustic monitoring. The Bat Management Plan shall also include recommendations to minimize impacts to roosting bats including the implementation of no-disturbance buffers, tree- and cliff-swallow nest removal protocols, passive exclusion of bats outside of the maternity and hibernation seasons (if impacts are unavoidable), and/or species-specific replacement alternative roosting habitat. Tree Avoidance and Removal Process. If trees are scheduled to be removed (e.g., relocating) or modified (e.g., trimming) that were determined to be suitable for bat roosting as part of the Bat Habitat Assessment (BIO-1), these activities shall be scheduled during one of the seasonal periods of bat activity, listed below, DQGZKHQHYHQLQJWHPSHUDWXUHVDUHQRWEHORZÛ)DQGUDLQLVnot over 0.5 inch in 24 hours: x September 1 to October 31 (preferred): This is after the maternity season but prior to winter torpor.

CITY PARK REVITALIZTION PROJEC T EIR ADDENDUM MITIGATION MONI TORING AND REPO RTING PROGRAM

CITY OF CORONA

2. Mitigation Monitoring and Conditions of Approval Requirements Page 8 PlaceWorks Table 1 Mitigation Monitoring Requirements
Mitigation Measure
Responsibility for
Implementation Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
(Date of Compliance)
x February 15 to March 31: After winter torpor but prior to the start of the maternity season.

If trees with suitable bat roosting habitat are scheduled for removal or relocation outside of the maternity season, tree removal during the time periods and weather parameters described above using the two-step method shall be conducted: x Prior to the two-step method, as much as feasible, vegetation and trees within the area that are not suitable for roosting bats will be removed first to provide a disturbance that might reduce the likelihood of bats using the habitat. x Two-step tree removal will occur over two consecutive days under the supervision of a qualified bat biologist. On Day 1, small branches and small limbs containing no cavity, crevice or exfoliating bark habitat on habitat trees (or outer fronds in the case of palm trees), as identified by a qualified bat biologist are removed first, using chainsaws only (i.e., no dozers, backhoes). The following day (Day 2), the remainder of the tree is to be felled/removed. (The intention of this method is to disturb the tree with noise and vibration and branch removal on Day 1. This should cause any potentially present day-roosting bats to abandon the roost tree after they emerge for nighttime foraging. Removing the tree quickly the next consecutive day should avoid reoccupation of the tree by bats).

If tree removal/modification must occur during the maternity season (April 1 to August 31), a qualified bat biologist shall conduct a focused emergence survey(s) of the tree(s) within 48 hours of scheduled work. If a maternity roost is located, whether solitary or colonial, that roost will remain undisturbed until after the maternity season or until a qualified biological monitor has determined the roost is no longer active.

CITY PARK REVITALIZTION PROJEC T EIR ADDENDUM MITIGATION MONI TORING AND REPO RTING PROGRAM

CITY OF CORONA

2. Mitigation Monitoring Requirements
June 2026 Page 9
Table 1 Mitigation Monitoring Requirements
Mitigation Measure
Responsibility for
Implementation Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
(Date of Compliance)
BIO-2 If sensitive biological resources are identified within or adjacent to the proposed development project area, the construction limits shall be clearly flagged to ensure impacts to sensitive biological resources are avoided or minimized to the extent feasible. Prior to implementing construction activities, a qualified biologist shall verify that the flagging clearly delineates the construction limits and sensitive resources to be avoided.

Qualified Biologist in coordination with the Construction Contractor and the City of Corona Planning Division Prior to Construction Activities
City of Corona Planning Division
BIO-3 If sensitive biological resources are known to occur within or adjacent to the proposed development project area, a projectspecific contractor training program shall be developed and implemented to educate project contractors on the sensitive biological resources within and adjacent to the proposed development project area and measures being implemented to avoid and/or minimize impacts to these species. A qualified biologist shall develop and implement the contractor training program.

Qualified Biologist in coordination with the Construction Contractor and the City of Corona Planning Division Prior to Construction Activities
City of Corona Planning Division
BIO-4 If sensitive biological resources are present within or adjacent to the proposed development project area and impacts may occur from implementation of construction activities, a qualified biological monitor may be required during a portion or all of the construction activities to ensure impacts to the sensitive biological resources are avoided or minimized to the extent feasible. The specific biological monitoring requirements shall be evaluated on a project-by-project basis. The qualified biological monitor shall be approved by the City on a project-byproject basis based on applicable experience with the sensitive biological resources that may be impacted.

Qualified Biologist in coordination with the Construction Contractor and the City of Corona Planning Division During Construction Activities City of Corona Planning
Division
BIO-7 The City of Corona shall require applicants for future development projects to contract with a qualified biologist to conduct a preconstruction general nesting bird survey within all suitable nesting habitats that may be impacted by active construction during general avian breeding season (February 1 through August 31). The preconstruction surveys shall be conducted no more than 7 days prior to initiation of construction.

Qualified Biologist in coordination with the Construction Contactor and the City of Corona Planning Division Prior to and During Construction Activities
City of Corona Planning Division

CITY PARK REVITALIZTION PROJEC T EIR ADDENDUM MITIGATION MONI TORING AND REPO RTING PROGRAM

CITY OF CORONA

2. Mitigation Monitoring and Conditions of Approval Requirements Page 10 PlaceWorks Table 1 Mitigation Monitoring Requirements
Mitigation Measure
Responsibility for
Implementation Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
(Date of Compliance)
If no active avian nests are identified within the proposed development project area or within a 300-foot buffer of the proposed development project area, no further mitigation is necessary. If active nests of avian species covered by the Fish and Game Code are detected within the proposed development project area or within a 300-foot buffer of the proposed development project area, construction shall be halted until the young have fledged, until a qualified biologist has determined the nest is inactive, or until appropriate mitigation measures that respond to the specific situation have been developed and implemented in consultation with the regulatory agencies. Based on the discretion of the qualified biologist, the 300-foot buffer may be expanded as appropriate to the species.

CULTURAL RESOURCESCUL-5 If subsurface deposits believed to be cultural or human in origin are discovered during construction, all work must halt within a 100-foot radius of the discovery. A qualified professional archaeologist, meeting the Secretary of the Interior’s Professional Qualification Standards for prehistoric and historic archaeology, shall be retained to evaluate the significance of the find, and shall have the authority to modify the no-work radius as appropriate, using professional judgment. The following notifications shall apply, depending on the nature of the find: a. If the professional archaeologist determines that the find does not represent a cultural resource, work may resume immediately, and no City and NEPA lead agency (if applicable) notifications are required. b. If the professional archaeologist determines that the find does represent a cultural resource from any time period or cultural affiliation, the archaeologist shall immediately notify the City and NEPA lead agency (if applicable). The City, in consultation with the qualified archaeologist and other consulting parties as the City deems appropriate, shall consult on a finding of eligibility and implement appropriate treatment Qualified Archaeologist, in coordination with the City of Corona Planning Division Prior to and During GroundDisturbing Activities City of Corona Planning Division I I

CITY PARK REVITALIZTION PROJEC T EIR ADDENDUM MITIGATION MONI TORING AND REPO RTING PROGRAM

CITY OF CORONA

2. Mitigation Monitoring Requirements
June 2026 Page 11
Table 1 Mitigation Monitoring Requirements
Mitigation Measure
Responsibility for
Implementation Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
(Date of Compliance)
measures, if the find is determined to be a Historical Resource under CEQA, as defined by CEQA or a historic property under Section 106 NHPA, if applicable. Work may not resume within the no-work radius until the lead agencies, through consultation as appropriate, determine that the site either: 1) is not a Historical Resource under CEQA or a Historic Property under Section 106; or 2) that the treatment measures have been completed to their satisfaction. c. If the find includes human remains, or remains that are potentially human, the archaeologist shall notify the Riverside County Coroner (per § 7050.5 of the Health and Safety Code). The provisions of § 7050.5 of the California Health and Safety Code, § 5097.98 of the California PRC will be implemented. If the coroner determines the remains are Native American, the City shall follow the process outlined under Mitigation Measure TCR-2.

GEOLOGY AND SOILS GEO-1 High and Low-to-High Sensitivity. In areas designated as having “high” or “low-to-high” sensitivity for paleontological resources, the project applicant shall be required to submit a Paleontological Resources Monitoring and Mitigation Plan (PRMMP). The PRMMP shall be prepared by a Qualified Paleontologist meeting the standards of Society of Vertebrate Paleontology (2010). The plan shall address specifics of monitoring and mitigation based on the project area and project’s construction plan, and shall take into account updated geologic mapping, geotechnical data, updated paleontological records searches, and changes to the regulatory framework at the time of analysis. The PRMMP shall be submitted to the City of Corona’s Community Development Department prior to approval of a grading permit.

Qualified Paleontologist in coordination with the City of Corona Planning Division Prior to Approval of a Grading Permit
City of Corona Planning Division
GEO-3 Low-to-High Sensitivity. Projects involving ground disturbance in previously undisturbed areas mapped with “low-to-high” paleontological sensitivity shall require monitoring if construction Qualified Paleontologist in coordination with the Construction Contractor Prior to and During GroundDisturbing Activities City of Corona Planning Division

CITY PARK REVITALIZTION PROJEC T EIR ADDENDUM MITIGATION MONI TORING AND REPO RTING PROGRAM

CITY OF CORONA

2. Mitigation Monitoring and Conditions of Approval Requirements Page 12 PlaceWorks Table 1 Mitigation Monitoring Requirements
Mitigation Measure
Responsibility for
Implementation Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
(Date of Compliance)
activity exceeds the depth of the low-sensitivity surficial sediments. The underlying sediments may have high sensitivity; therefore, work in those units shall require paleontological monitoring, as designated by the Qualified Paleontologist in the Paleontological Resources Monitoring and Mitigation Plan (PRMMP). and the City of Corona Planning Division
GEO-6 All Projects. In the event of any fossil discovery, regardless of depth or geologic formation, construction work shall halt within a 50-foot radius of the find until its significance can be determined by a Qualified Paleontologist. Significant fossils shall be recovered, prepared to the point of curation, identified by qualified experts, listed in a database to facilitate analysis, and deposited in a designated paleontological curation facility in accordance with the standards of the Society of Vertebrate Paleontology (2010). The most likely repository is the Natural History Museum of Los Angeles County (NHMLA). The repository shall be identified, and a curatorial arrangement shall be signed, prior to collection of the fossils.

Qualified Paleontologist in coordination with the Construction Contractor and the City of Corona Planning Division During Ground Disturbing Activities
City of Corona Planning Division
NOISE N-1 Construction contractors shall implement the following measures for construction activities conducted in the City. Construction plans submitted to the City shall identify these measures on demolition, grading, and construction plans submitted to the City. The City Corona Public Works Department shall verify that grading, demolition, and/or construction plans submitted to the City include these notations prior to issuance of demolition, grading and/or building permits. x During the active construction period, equipment and trucks used for project construction shall utilize the best available noise control techniques (e.g., improved mufflers, intake silencers, ducts, engine enclosures, and acoustically attenuating shields or shrouds), wherever feasible.

Construction Contractor and the City of Corona Public Works Department Prior to Approval of Demolition/Grading/Building Permits and During Construction Activities City of Corona Public Works Department

CITY PARK REVITALIZTION PROJEC T EIR ADDENDUM MITIGATION MONI TORING AND REPO RTING PROGRAM

CITY OF CORONA

2. Mitigation Monitoring Requirements
June 2026 Page 13
Table 1 Mitigation Monitoring Requirements
Mitigation Measure
Responsibility for
Implementation Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
(Date of Compliance)
x Impact tools (e.g., jack hammers and hoe rams) shall be hydraulic- or electric-powered wherever feasible. Where the use of pneumatic tools is unavoidable, an exhaust muffler on the compressed air exhaust shall be used along with external noise jackets on the tools. x Stationary equipment such as generators and air
compressors shall be located as far as feasible from noisesensitive uses. x Stockpiling shall be located as far as feasible from noisesensitive receptors. x Construction traffic shall be limited—to the extent feasible— to approved haul routes established by the City.
x Prior to the start of construction activities, a sign shall be posted at the entrance(s) to the job site, clearly visible to the public, that includes permitted construction days and hours, as well as the contact information of the City’s and contractor’s authorized representatives that are assigned to respond in the event of a noise or vibration complaint. If the authorized contractor’s representative receives a complaint, they shall investigate, take appropriate corrective action, and report the action to the City. x Signs shall be posted at the job site entrance(s), within the on-site construction zones, and along queueing lanes (if any) to reinforce the prohibition of unnecessary engine idling. All other equipment shall be turned off if not in use for more than 5 minutes. x During the entire active construction period and to the extent feasible, the use of noise-producing signals, including horns, whistles, alarms, and bells, shall be for safety warning purposes only. The construction manager shall be responsible for adjusting alarms based on the background

CITY PARK REVITALIZTION PROJEC T EIR ADDENDUM MITIGATION MONI TORING AND REPO RTING PROGRAM

CITY OF CORONA

2. Mitigation Monitoring and Conditions of Approval Requirements Page 14 PlaceWorks Table 1 Mitigation Monitoring Requirements
Mitigation Measure
Responsibility for
Implementation Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
(Date of Compliance)
noise level, or to utilize human spotters when feasible and in compliance with all safety requirements and laws. x When construction noise is predicted to exceed established noise standards and when the anticipated construction duration is two years or more, contractors shall erect temporary noise barriers, where feasible.

TRIBAL CULTURAL RESOURCES TCR-1 Tribal Cultural Resources Monitoring Prior to Commencement of Ground Disturbing Activities. A. The project applicant/lead agency shall retain a Native American Monitor from or approved by the Gabrieleño Band of Mission Indians – Kizh Nation (”Tribe”). The monitor shall be retained prior to the commencement of any “ground-disturbing activity” for the subject project at all project locations (i.e., both on-site and any off-site locations that are included in the project description/definition and/or required in connection with the project, such as public improvement work). “Ground-disturbing activity” shall include, but is not limited to, potholing, auguring, tree removal, boring, grading, excavation, drilling, and trenching. B. A copy of the monitoring agreement shall be submitted to the lead agency prior to the earlier of the commencement of any ground-disturbing activity, or the issuance of any permit necessary to commence a ground-disturbing activity.

C. The monitor will complete daily monitoring logs that will provide descriptions of the relevant ground-disturbing activities, the type of construction activities performed, locations of grounddisturbing activities, soil types, cultural-related materials, and any other facts, conditions, materials, or discoveries of significance to the Tribe. Monitor logs will identify and describe any discovered TCRs, including but not limited to, Native American cultural and historical artifacts, places of significance, etc. as defined in Public Resources Code Section 21074, (collectively, tribal cultural City of Corona Planning Division, Construction Contractor in coordination with Native American Tribal Monitor 30-days Prior to Issuance of a Grading Permit and During Ground Disturbing Activities City of Corona Planning Division

CITY PARK REVITALIZTION PROJEC T EIR ADDENDUM MITIGATION MONI TORING AND REPO RTING PROGRAM

CITY OF CORONA

2. Mitigation Monitoring Requirements
June 2026 Page 15
Table 1 Mitigation Monitoring Requirements
Mitigation Measure
Responsibility for
Implementation Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
(Date of Compliance)
resources, or “TCR”), as well as any discovered Native American human remains and associated grave goods. Copies of monitor logs will be provided to the project applicant/lead agency upon written request to the Tribe. D. On-site tribal monitoring shall conclude upon written confirmation to the Tribe from a designated point of contact for the project applicant/lead agency that all ground-disturbing activities and phases that may involve ground-disturbing activities on the project site or in connection with the project are complete.

TCR-2 Unanticipated Discovery of Tribal Cultural Resources or Human Remains.A. Native American human remains are defined in PRC 5097.98 (d)(1) as an inhumation or cremation, and in any state of decomposition or skeletal completeness. Funerary objects, called associated grave goods in Public Resources Code Section 5097.98, are also to be treated according to this statute. B. Human remains and associated grave goods shall be treated alike per California Public Resources Code section 5097.98(d)(2). C. Any discovery of human remains/associated grave goods shall be kept confidential as required by state law. D. Upon discovery of any TCRs, all construction activities in the immediate vicinity of the discovery shall cease (i.e., not less than the surrounding 50 feet) and shall not resume until the discovered TCRs are removed in the form and/or manner the Tribe deems appropriate, in the Tribe’s sole discretion, and for any purpose the Tribe deems appropriate, including for educational, cultural and/or historic purposes. E. In the event of a discovery of Native American human remains, the project applicant shall comply with PRC 5097.98.

City of Corona Planning Division and the applicable Native American Tribe During Ground Disturbing Activities
City of Corona Planning Division

CITY PARK REVITALIZTION PROJEC T EIR ADDENDUM MITIGATION MONI TORING AND REPO RTING PROGRAM

CITY OF CORONA

2. Mitigation Monitoring and Conditions of Approval Requirements

Page 16 ends

2.2 CONDITIONS OF APPROVAL MATRIX
Project-specific conditions of approval have been categorized in matrix format, as shown in Table 2, Conditions of Approval Requirements. The matrix identifies the environmental factor, specific conditions of approval, schedule, and responsible monitor. The conditions of approval matrix will serve as the basis for scheduling the implementation of, and compliance with, all conditions of approval.

CITY PARK REVITALIZTION PROJEC T EIR ADDENDUM MITIGATION MONI TORING AND REPO RTING PROGRAM

CITY OF CORONA

2. Mitigation Monitoring Requirements
June 2026 Page 17
Table 2 Conditions of Approval Requirements
Condition of Approval
Responsibility for
Implementation Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
(Date of Compliance)
NOISE COA-N-1 The City shall implement measures to reduce amplified music or sound associated with live music concert and movie night events. The following measures shall be incorporated as conditions of approval for the proposed project: x Restrict amphitheater sound system output to an average of 90 dBA Leq, averaged over a 15-minute period, at a position located 100 feet from the central lawn or portable stage area and portable movie screen of the park. x Restrict instantaneous maximum sound levels allowed for live music concerts to 95 dBA Lmax at a position located 100 feet from the central lawn or portable stage area and portable movie screen of the park. x Noise monitoring will be conducted and monitored and
reviewed throughout the event to provide sound technicians with noise data for appropriate sound system mixing board adjustments to ensure compliance with regulations. x Noise monitoring will be conducted with a handheld sound level meter. The meter shall satisfy the American National Standards Institute (ANSI) standard for Type I or II instrumentation.

City of Corona Community Services Department
During Live Music Concerts and Movie Night Events at the Park City of Corona Community Services Department

CITY PARK REVITALIZTION PROJEC T EIR ADDENDUM MITIGATION MONI TORING AND REPO RTING PROGRAM

CITY OF CORONA

2. Mitigation Monitoring and Conditions of Approval Requirements Page 18 PlaceWorks This page intentionally left blank.

June 2026 Page 19

3. Report Preparation

3.1 LIST OF PREPARERS
City of Corona (Lead Agency)
Rachel McLure, Senior Project Manager
PlaceWorks (CEQA Consultant)
Malia Durand, Principal
Emma Haines, Associate I

CORONA GENERAL PLAN TECHNICAL UPDATE MITI GATION MONITORING AND REPORTING PROGRAM

CITY OF CORONA

3. Report Preparation

Page 20 ends

This page intentionally left blank.

DATE: 06/29/2026
TO: Honorable Chair and Board Members
FROM: Planning and Development Department
2026-238
APPLICATION REQUEST:

MARD2026-0002: Review of proposed alterations to City Park (Historic District HD-005), a designated historic district listed on the Corona Register of Historic Resources, as part of the Corona City Park Revitalization Project, located at 930 East Sixth Street. (Applicant:

City of Corona, Public Works Department, 400 South Vicentia Avenue, Corona, CA 92882)
RECOMMENDED ACTION:

That the Historic Preservation Board adopt an Addendum to the certified Environmental Impact Report for the 2020-2040 General Plan and adopt Resolution No. 2689 granting alterations to City Park (MARD2026-0002), based on the findings contained in the staff report and recommended conditions of approval.

EXECUTIVE SUMMARY:

This is a request for the Historic Preservation Board (“Board”) to consider and approve the proposed alterations to the contributing historic resources at City Park, a historic district (HD-005) listed on the Corona Register of Historic Resources. The City’s Public Works Department, in coordination with the Community Services Department, is the applicant for this request.

Pursuant to Corona Municipal Code (CMC) Section 17.63.120(D)(1), major alterations to historic resources, including historic districts, are subject to the Board’s review and approval, subject to the guidelines outlined under Section 17.63.120(C).

The City Park Revitalization Project is a comprehensive redevelopment of the park site that introduces new public buildings, amenities, landscaping, parking, and modernized infrastructure, and preserves the remaining contributing historic resources and other key artifact features, significant trees, and the twenty acres of land which geographically defines this unified open space as the City of Corona’s first and oldest public park.

Associated with the proposed park alterations and improvements is an Addendum to the General Plan Environmental Impact Report (EIR) ("Addendum"), prepared by the City in accordance with the California Environmental Quality Act (CEQA) to evaluate the environmental effects of the alterations. As part of this request, the Board is also being asked to consider and adopt the Addendum in conjunction with its review of the proposed alterations.

BACKGROUND
City Park History and its Defining Features
City Park was constructed in 1913 and is Corona’s first and oldest public park. In 2001, the City Council designated City Park as a Historic District (HD-005) pursuant to Resolution No. 2001-51 (Exhibit 2). According to Resolution No. 2001-51, the historic value of City Park is “defined by its open space, picnic tables, shelters, landscaping, trees and shade, recreational opportunities, and its relaxing beauty. These qualities are timeless, offering a bond between the families of yesteryear and today.” The approximately 20-acre park included the planting of 1,676 plants and trees, with irrigation added in 1925, and later features such as a “Municipal Plunge” (1925 and demolished in 1967), Founders Monument (1936), comfort station (1938), and numerous picnic tables, pathways and shelters.

While the park has undergone numerous alterations over decades, including removal or replacement of landscaping and nearly all of the site’s original structures and amenities, four significant features remain and serve as its remaining contributing historic resources.

1. Founder’s Rock: This monument commemorates the individuals (founders) that established the citrus colony that eventually became the town of Corona.

Founder’s Rock is proposed to be relocated to a prominent location at City Park forward of a new community center building, as identified on Exhibit 4.

2. Sunkist Air Compressor (Steam Engine): Originally a component of a Sunkist agriculture plant located elsewhere in the City, the compressor was broadly integral in developing and maintaining the local citrus industry and is proposed to be relocated to a space at City Park between a new skate park and playground, as identified on Exhibit 4.

3. Drinking Fountain: Originally placed in 1913, the drinking fountain (no longer connected to the City’s water system) reflects the design evolution of the park and is proposed to be moved to a passive green area at City Park, as identified on Exhibit 4.

4. Landscaping (including a singular Fig Tree): As stated, the property was originally developed with over 1,600 plants and trees. As part of the proposed alterations, 274 trees will be removed, 46 protected-in-place, 59 relocated, and 205 new trees planted (for a new total of 310 total trees). The tree relocation and preservation plan is attached as Exhibit 6. Of the many trees located within City Park, a singular large fig tree dates to the park’s initial construction and will be preserved in its current location at the southwestern corner of the site (Exhibit 4).

Existing Conditions of City Park
City Park has experienced substantial deterioration over time. Existing infrastructure, including access drives, pedestrian pathways, and parking areas exhibit significant wear and tear from decades of use. Many of the park amenities, such as the picnic shelters, playground equipment, and the skate park, need replacement or modernization. The west and east ends of the park contain large unimproved dirt areas that were once improved with a community pool (west end) and an armory building and parking lot (east end).

There is currently no community center. The park regularly experiences recurring transient activity which has subsequently discouraged families from visiting the park because of safety concerns. These conditions, collectively, have contributed to the park’s declining functionality, aesthetic quality, and recreational use, as well as minimizing the historic quality and value of the resource.

City Park is identified in both the Downtown Revitalization Specific Plan (zoning document) and the Downtown Revitalization Plan (economic revitalization plan) as an opportunity area for restoration. The park is also identified as one of the objectives on the City’s Strategic Plan and listed on the City’s Capital Improvement Program (CIP) as a CIP project.

Project History
The City Council adopted the City Park Master Plan in July 2023 following an extensive community engagement process and City staff-held workshops. The Master Plan provides a long-term vision for the redevelopment and enhancement of City Park and serves as the guiding framework for the proposed City Park Revitalization Project.

Over the past five years, conceptual plans for the project have been reviewed by both the Parks and Recreation Commission and the City Council at various meetings, with each providing feedback or direction in accordance with their specific areas of purview. The project is being implemented through a collaborative effort between Public Works overseeing project delivery and Community Services overseeing project design and programming to ensure the improvements meet the community’s recreational needs.

Table 1 below provides a listing of the review and hearing history for the proposed project.

Table 1: Review and Hearing History for City Park Revitalization Project Date Body Summary
November 8, 2022 Parks and Recreation
Commission Initial update on the City Park Master Plan
July 19, 2023 City Council Adoption of the City Park Master Plan February 13, 2024 Parks and Recreation
Commission
Presentation of three design concepts for
City Park Revitalization Project.

February 21, 2024 City Council
Study session featuring presentation of
three design concepts. Council reviewed
and provided feedback.

April 9, 2024 Parks and Recreation
Commission Final design presentation
April 17, 2024 City Council
Study session for final design for City Park
Revitalization Project (site plan, circulation,
event spaces, and building design);
discussion only
May 15, 2024 City Council Parks & Recreation Commission report on the City Park Revitalization Project
January 21, 2026 City Council
Final design update, including site plans,
renderings, tree preservation, and next
steps.

The City Council has conceptually approved the overall project design and improvements, including the site layout and architecture of the new buildings.

The Board’s review is limited to those aspects of the project subject to its authority under Section 17.63.120(C), which are outlined in the Findings section of this report.

PROJECT DESCRIPTION
MARD2026-0002 is a request for the Board’s review of the proposed alterations to Historic District HD-005 (City Park) to determine compliance with criteria listed in CMC Section 17.63.120(C). While most original elements of City Park (including buildings, amenities and infrastructure) have been removed or replaced over decades, the City Park Revitalization Project preserves the aforementioned four contributing historic resources, coupled with new improvements described below. All facilities (and the Revitalization Project at large) are intended to enhance and restore the Historic District to its original intent as a landscaped public facility that serves as a place of gathering and multifaceted recreation for residents and visitors. Implementation of the proposed alterations will allow City Park to continue to be identified by its open space, picnic tables, shelters, landscaping, trees and shade, recreational opportunities, and its relaxing beauty, as originally intended when City Park was designated as a historic district. The proposed improvements for City Park, which are separate and apart from the four contributing historic resources discussed above, are summarized below.  Community Center: New building to comprise 64,323 square feet of floor area and include a banquet facility, gymnasium, fitness center, game room, conference center, offices, and “learning spaces.” The building’s design incorporates surface materials including warm stucco finished walls and a reddish-brown standing seam roof reminiscent of historic terra cotta roofing materials. The large gable roof is a nod to the old packing houses in the City.
 Aquatics Center: Various recreational water facilities including a competition pool, recreation pool (with a “lazy river” and water slide), spa, and shade structures. The aquatics center restores the recreational function of the original “Municipal Plunge”, which was constructed at City Park in 1925.  “Community Canvas:” A new, centrally located open air event space intended to accommodate group gatherings and public events in coordination with other proposed facilities.
 Playground, fitness and sports courts: Various active amenities to include two new playgrounds (each intended for specific age groups) that incorporate design elements from old citrus crates, covered picnic structures, a natural splash pad with historic-themed water towers and buckets, two basketball courts, and a skate park/pump track.
 Landscaping: A total of 205 new trees (as well as a wide variety of new groundcover and recreational turf) will be added throughout the park, chosen and placed to provide effective shading, screening and/or enhanced aesthetics.  Parking, pedestrian and vehicular pathways: Five new or remodeled surface parking lots containing a total of 325 spaces are proposed and intended to facilitate convenient access to new buildings and amenities. New, meandering pedestrian pathways within the park, providing opportunities for jogging and facilitated by new signage and landscaping, sightseeing, bird watching and the like.

While Chapter 17.63 (Historic Resources) of the CMC does not mandate a period-specific architectural style or materials pallet, the Community Center has been designed to incorporate exterior materials and natural color schemes that reflect Corona’s historical architectural character. Also, the playground structures feature images of Corona’s citrus history and the structures resemble traditional wooden citrus crates, a subtle nod to the City’s agricultural past.

ENVIRONMENTAL ANALYSIS
In accordance with the California Environmental Quality Act (CEQA), the City prepared an Addendum to the EIR previously certified on June 3, 2020 for the City’s 2020-2040 General Plan (SCH No. 2018081039). The Addendum, titled City Park Revitalization Project EIR Addendum, is attached as Exhibit 10. The purpose of the Addendum is to evaluate whether the proposed alterations to City Park would create significant impacts, as defined by CEQA, that were not previously analyzed in the General Plan EIR. The environmental topics reviewed included air quality, traffic and transportation, geology, cultural and tribal cultural resources, land use, hazards, noise, and biological resources, among others.

Based on the analysis in the Addendum, the City determined that the proposed City Park revitalization alterations and improvements would not result in any new significant environmental impacts or substantially increase the severity of impacts previously identified in the General Plan EIR. As a result, no additional environmental review is required under CEQA.

To prepare the Cultural Resources section in the Addendum, outreach to the Corona Historic Preservation Society (CHPS) was conducted on March 28, 2024. The CHPS, responded on March 29 and April 13, emphasizing the preservation of historic elements such as Founders Rock, Sunkist air compressor, drinking fountain, and landscaping.

The Cultural Resources section also references an Archaeological and Architectural Resources Inventory and Evaluation Report prepared for the project. The report evaluated the park’s historical significance and existing conditions and concluded that the proposed alterations and improvements would not result in significant impacts to historic resources.

The Addendum identifies mitigation measures that will be incorporated into the project to reduce potential environmental effects. These measures include noise mitigation requirements (included herein as a condition of approval) designed to reduce noise generated by outdoor concerts and other programmed events to less-than-significant levels at nearby residences north of the park. The Community Services Department will implement the noise condition as part of the park’s ongoing operations.

FISCAL IMPACT
The project is a City-initiated application and therefore, there are no processing fees associated with this request.

PUBLIC NOTICE AND COMMENTS
A 10-day public notice was mailed to all property owners within a 500-foot radius of the project site, as well as advertised in the Sentinel Weekly News and posted at the project site. As of the preparation of this report, no correspondence has been received from the public concerning the subject project.

STAFF ANALYSIS
City Park is located on Sixth Street, just east of the historic Grand Boulevard Circle and serves as a defining open space feature within Downtown Corona. The proposed alterations would not change or diminish the park’s historic geographic location. Instead, it would enhance the park’s function and appearance and reinforce its place as a community gathering place for various events, including civic events, and contribute to the vitality of Downtown Corona. The improvements would also strengthen public awareness and appreciation of the Historic District by creating an attractive community destination that encourages residents and visitors to City Park.

The project implements the vision of the City Park Master Plan and the goals and policies of the General Plan’s Parks, Recreation, Cultural Arts, and Education Element through the development of a family-oriented community park featuring a variety of recreational amenities. The project is also consistent with Historic Resources Element Goal HR-2 and Land Use Element Goal LU-17 of the General Plan, as discussed in the Findings section below.

New buildings and recreation facilities have been designed to incorporate colors, materials, and architectural elements that reflect Corona’s development history and agricultural past. The proposed alterations to City Park, in particular the preservation of the remaining four contributing historic resources, have been evaluated by staff in accordance with the standards set forth by Section 17.63.120(C) of the CMC and determined to be consistent with those requirements, as set forth in the findings below.

Therefore, staff recommends approval of the proposed alterations. The findings necessary to approve the proposed alterations to the Historic District are presented below.

FINDINGS OF APPROVAL FOR MARD2026-0002

1. MARD2026-0002 is consistent with the elements of the City of Corona General Plan, including the goals and policies stated therein, for the following reasons:
a. MARD2026-0002 is consistent with the overall goals and policies of the Parks, Recreation, Cultural Arts, and Education Element through the development of a family-oriented community park featuring a variety of recreational amenities to serve the diverse needs of Corona. b. Goal HR-2 of the Historic Resources Element encourages the retention, restoration, adaptive reuse, and maintenance of historic properties while protecting their historic integrity in the best possible condition. MARD2026- 0002 is consistent with this goal by preserving City Park’s historic function as a community gathering place while rehabilitating the site with modern public amenities, upgraded infrastructure, enhanced landscaping, and new recreational facilities that ensure its continued long-term use. Although many of the park’s original historic features no longer remain, the project incorporates design elements, materials, colors, and imageries that acknowledge the park’s historic character and cultural significance. The project also retains four historic resources including the Founder’s rock, Sunkist air compressor, drinking fountain, and a significant number of existing trees. By investing in the rehabilitation and continued public use of this designated historic district, MARD2026-0002 promotes the long-term preservation, maintenance, and appreciation of City Park consistent with Goal HR-2.
c. Goal LU-17 of the Land Use Element seeks to establish a revitalize Downtown Corona as the centerpiece of community identify, history and culture, and governance – known for its diverse and eclectic physical development and form, vibrant economy, historic character, and pedestrian activity. MARD2026-0002 revitalizes the park through new public amenities, enhanced landscaping, modernized infrastructure, and improved pedestrian circulation while incorporating design elements that acknowledge the park's historic character and cultural significance. These improvements reinforce the park's role as a focal point of Downtown Corona, promote public activity and community engagement, and contribute to the continued revitalization of the downtown area consistent with Goal LU-17.

2. Pursuant to Section 17.63.120(C) of the CMC, any plan involving the alteration of a historic resource shall be reviewed and approved, to the extent practical in accordance with the city’s design guidelines for historic structures, or in the absence of such guidelines, the Secretary of the Interior’s Standards for Rehabilitation. The following principles shall be adhered to in the review and approval of such plans:
a. The distinguishing original qualities or character of the historic resource shall not be compromised. The removal or alteration of any historic material or distinctive architectural features should be avoided when possible. i. The alterations as proposed by MARD2026-0002 will not compromise the distinguishing historic qualities or character of City Park or the four remaining contributing historic resources located at City Park. Although the park has undergone substantial alterations over time, the project preserves the four remaining historic resources that contribute to the district's significance on site: Founder's Rock, the Sunkist Air Compressor, the historic drinking fountain, and historic landscaping, including the original fig tree. Where relocation of historic features is proposed, the relocation will improve visibility, accessibility, and integration into the revitalized park while ensuring their continued preservation. The project does not involve the unnecessary removal of significant historic resources and has been designed to maintain the historic character of City Park while allowing for modernization of the park's facilities and amenities. b. The colors, textures, materials, fenestration, decorative features and details, height, scale, massing and methods of construction proposed shall be consistent with the historic period and character-defining elements of the historic resource and compatible with adjacent structures. i. The proposed buildings, recreational facilities, and site improvements have been designed to incorporate colors, materials, and architectural elements including citrus imageries that reflect Corona's historical development and agricultural past. The Community Center and recreational amenities utilize painted stucco, earth-tone color palettes, and other design features representative of Corona's architectural history. The preservation, relocation, and replacement of several existing trees and the preservation of the four remaining historic resources within the park preserve and arguably enhance the visual character of the Historic District. Overall, the proposed alterations and improvements will preserve and reinforce City Park’s historic setting as a community gathering place for Downtown Corona, will not diminish the historic value of the resource as identified when City Park was designated an historic district, and are consistent with the character-defining elements of the historic resource while remaining compatible with the surrounding area.

3. MARD2026-0002 is consistent with the applicable Secretary of the Interior's Standards for Rehabilitation (36 C.F.R. § 67.7) because the project preserves City Park's historic function as the City's public gathering place while enhancing the site with modern recreational amenities, buildings, enhanced landscaping, and infrastructure that ensure its continued long-term public use. Character-defining features, including the park's mature trees and notable historic elements, are retained, relocated where appropriate, or replaced in a manner that maintains the park's historic character. The project incorporates compatible design elements including warm earth-toned color palettes, stucco finishes, reddish-brown roofing reminiscent of historic terra cotta materials, and citrus imageries that subtly reference Corona’s historic architectural character and agricultural heritage. The new aquatics center, open air event area, and other features reestablish City Park's role as a destination for community recreation and gathering. The new improvements are appropriately scaled within the approximately 20-acre park, are compatible with the historic setting, and preserve the overall integrity of the historic district. Collectively, the project rehabilitates and revitalizes City Park in a manner that respects and preserves its historic significance while allowing it to continue serving the community.

PREPARED BY: BRENDAN DALDE, ASSOCIATE PLANNER
REVIEWED BY: EVAN LANGAN, AICP, SENIOR PLANNER
REVIEWED BY: SANDRA VANIAN, PLANNING MANAGER
SUBMITTED BY: DANNY CASTRO, PLANNING AND DEVELOPMENT DIRECTOR Exhibits:

1. Resolution No. 2689

2. City Council Adopted Resolution No. 2001-51

3. Historic District (City Park) Elements

4. Historic District (City Park) Relocation Plan

5. City Park Renderings and Site Plan

6. Tree Preservation Plan

7. Conditions of Approval

8. Correspondence with the Corona Historic Preservation Society, dated March 29 and April 13, 2024

9. Applicant Letter, dated March 3, 2026

10. General Plan EIR Addendum for the City Park Revitalization Project

11. Mitigation Monitoring Reporting Program for the City Park Revitalization Project City Park - Fig Tree
City Park - Founders' Rock
City Park - Historic Fountain City Park - Historic Fountain City Park - Whistle Compresso
r
EVCS EVCS EVCS EVCS EVCS EVCS EVCS EVCS EVCS EVCS READY READY EVCS EVCS EVCS READY > EVCS VAN VAN EVCS EVCS READY EV

EV EV READY

EV READY

EV READY

EV READY

EV READY

EV READY

EV READY

EV READY

EV READY

EV READY EV READY EV READY EV READY EV READY EV READY EV READY EV READY EV READY EV READY EV READY EV READY EV READY EV READY EV READY EV READY EV READY EV READY EV READY EV READY EV READY EV READY EV READY EV READY EV READY EV EVCS VAN EV READY EV READY

EV READY

EV READY

EV READY

EV READY

EV READY

EV READY

EV READY

EV READY

EV READY
EV EVCS VAN >

FEC FEC
FEC FEC FEC FEC FEC FEC FEC FEC FEC FEC REF.

FEC FEC FEC FEC
FEC FEC FEC 0 10 2472 144 6'-0" 665 666 667 668 668 668 667 668 667 665 666 666 667 665 666 667 668 669 666 667 668 666 665 666 665 666665 666 665 666 665 666 665 666 665 666 666 665 666 665 665 666 665 666 665 666 666 665 666 665 665 666 666 665 666 665 666 665 667666 668 665 666 666 666 666666 666 666 665665665 666 665 665 666 666 667 666 665 666 665 666 665 666 665 665 666 665 666 666 665666 665666 665 669 667 666 668 666 666 665 664 664 664 665 665665 668 665 668 GB GB GB 668 HB-1 HB-1 1"=40' 0 40' 80' 120' HISTORIC OBJECTS 23202 | CORONA CITY PARK | March 3, 2026 
  




  


























 













            
  







!"#$ %&'()
*!&'%+,#-'. ./

0%1 2,&
"3'$) 1%"!'$4 ,
% )# +#&5 %+#& #) 5
%+#& #) 5 )#%+#&5
6"+

 %.5, +4%,2$+%'53 , "1"! . ##.0(,2')
2"" )5&
78%59,4#5'&5 ,
:'5%+!25 "#)", 5 %,2$+%4 ,$



;  (,24%42,


; ( #+! : .#94! %+2) !
! -25 .


 ( #+! : .#94! %+2) ! (,#9).%! -
#- ,3 2.%5, << ,
= ; )#%"#)) "5'#)%. "<&

>3 '(35 +#.%"!$4 ,

;

>3 '(35 +#.%"!$4 ,

;

>3 '(35 +#.%"!$4 ,

;
!2.. , 42,&?3#,'@#)52! #- ,3 2.%+2,2!
 ;=

 A
32).!##+
2& $4!1

=  A 3#,'@#)52!%! .. ,
2"" & %!2).')(%& 25
>%3 '(35
;

"9,4%B#,
;

2"" & '4! %+2) ! "9,4%B#,
2"" & '4! %+2) !
;

"9,4%B#,
2"" & '4! %+2) !


A ,')(%+9!!

=
;7 4#)(#%, 2"3 +2) !

=
;A ,')(0204 ! , 2"3%+2)
, 2"3%+2) !

=

'$2(

=
A
!#(# "!'$4 ,
6"+



%.5, +4%= >% !
59)) !%& '. '53#95%9++ ,
)"!#&9,

= "##!5#++ ,
&')(! %+#&5 +1,2$'.%,##B .4%#)!1 )#5 C%53 %"##!5#++ ,%&')(! +#&5%'&%)#5%'+ $2%" ,5'B .D 7=;
0&2


= "2& 52%4 !&

 A=
-'4,2%"3'$ & + )52 #)'"
&"2!



7   

E')(! $ 52!#+3#)
)#%+#&5
)#%+#&5
)#%+#&5
)#%+#&5
)#%+#&5
)#%+#&5
)#%+ &5
;
A
&'((! <)#5& )#%. "<&
7 
;
0+#.?& 25
7 
;
0+#.?& 25
)#%+#&5 )#%+#&5
7 
;
0+#.?& 25
7 
;
0+#.?& 25
;
A
&'((! <)#5& )#%. "<&
)#%+#&5 )#%+#&5


A; .#94!
&',!%&!'.

=
;
A7%4!#"<
'$2( %+2) !
",2!%59)) !
=>%#BB& 5
;
= . "<%5 %. "< +2) ! + ,'&"#+

=
;


=
:5 )&'#)
:5 )&'#) "#,) ,
6"+

 %.5, +4%,2$+%'53 , "1"! . ##.0(,2')
2"" )5&


7>%,#!! ,& '.
6"+

7= .5,%+4
!3%,#!! ,& '.
5,2)&5#) 4 )"3 .4%#)!1
;

( #+! : "!'$4 ,

=
 #+5'( 2,%+2) !
:5 )&'#)


5,2)&B ,
&5 +
:5 )&'#)
:5 )&'#) "#,) ,


; .#94!
&##&3%&!'.

=
A
+2) !& + ,$%32).3#!.

=
A
@##%+2) !
)#%+#&5 )#%+#&5 )#%+#&5
)#%+#&5 )#%+#&5 )#%+#&5
)#%+#&5
)#%+#&5 )#%+#&5
)#%+#&5 )#%+#&5
)#%+#&5 )#%+#&5 )#%+#&5
)#%+#&5 )#%+#&5
)#%+#&5 )#%+#&5 )#%+#&5
A 7
2!+') %&!'.
53, %&5 +&

;
 . "<%!')< ?32).,2!&


5,2)&B ,
&5 +

;  (,24%42,
&2..! %&+')) ,

 A;
>%& 25%3 '(35
&2..! %&+')) ,

 A;
7>%& 25%3 '(35

=
A7
&5#, %B,#)5 +2) !
*25%(,2. /
=
7
- ,5D%2&" )5
= 7
B', +#!
6"+

;=
+4%=>%:%=> 9). ,0. "<
&F92, %) 5% 4 !')(
6"+

;=
+4%=>%:%=> 9). ,0. "<
&F92, %) 5% 4 !')( )#%+#&5
)#%+#&5 )#%+#&5 )#%+#&5 )#%+#&5 )#%+#&5 )#%+#&5


!"#$ %&'()
*!&'%+,#-'. ./
0
%1 2,&

=

A
=>%. "<%.'B D
- ,5'"2!%!2.. ,
7;
 ##.%+!2)< '((! %!2.. ,
!##+%+#! %?, "1"! .
A7
##.0(,2') 32).3#!.&
A

=
 $2,4! %+2) !
6"+
=A7
%.5, +4%=>%#" ,#"< ,%& 25

=

A
=>%. "<%.'B D
- ,5'"2!%!2.. ,


A=
*4 !#%. "</ %/
6')5 ,)2!%) 5 G%4 !5%"!'$4 ,&
,9)(%"!'$4 ,
=




=
A
7

 A
=7

=
=
.'('B9& %B2"2. +2) !&
6')5 ,)2!%) 5 G%4 !5%"!'$4 ,& .'('B9& %B2"2. +2) !&
6')5 ,)2!%) 5 G%4 !5%"!'$4 ,& .'('B9& %B2"2. +2) !&
7>? %,'& %<'"<+!25
*<D+D/%F51D%*%%/

7>? %,'& %<'"<+!25
*<D+D/%F51D%*%%/ 
>%,'& %<'"<+!25
*5D<D+D/%F51D%*%%/ 

;

;

;



A=
=
H %I
%JKL%MN
%OIP  I
QRSKT%K
UTK V%I I
WRRTLQIV
LI 
KUT IQ
LI 
XYMTQNLJ%IW
RKQL
WRRTLQIV
KL 
SWI
WTI
SNKVJWTL
SKHQLJ
SKHQLJ
SKHQLJ
NW
NW
NW
NW
NW
SN SN SN
SN
SN
NW
SN
SN
SN
NW
SN
SN
NW
NW
NW
NW
SN
SNKP
SK
SQL
SKHQLJ
LWI%KS I
LWI%KS I
HKISKH
SQL
IWWR
MNJ
Z%WQ
SQL

[
\]^_`a^ bcdee]^ fe`c^agc bae^%e`c \a`c bae^%^]h iPL%SQLI%WL
jklmno%P Ip
^]%f]b
\]^b_\e]^
e_c
Sqrstuvwxy
\ bz{|}%e^\
b]~c\%e
[%%c]e]^%`a\c
`]%a^c`c}%\a€[


%
h‚
ƒ [
fa%
h‚
ƒ [
„z{|h
†
\]b]^a\e‡
abˆ
i%IVS%QN LKR%p
‰jk%OIP  I
WWLKŠ% ‰o‹Œ
kOo n%ZjkŽ%%XkŽ%Y
ok n%ZjkŽ%%XkŽ%Y
kj o%ZOkŽ%%XkŽ% Y
kj o%Z‰kŽ%%XSRQIY
‘’“”•%–—˜’™•”š
›œ%žŸ ¡¢%£¤¥œ¦§¨¤©
®¯°±²³
ª«¬­ ² ±²³ ®µ²³ ®´²³
¶·¸¹º»%¼½¾¸¿»ºÀ ¼ÂÃÄÅÆ%ÁÇÈÉÊË Á
ÌÍÎÏ Ð

01. Playground
RIOS Corona City Park Design Update 11/21/20245

01. Playground
RIOS Corona City Park Design Update 11/21/20246

02. Pump Track & Basketball
RIOS Corona City Park Design Update 11/21/20247

03. Splash Pad
RIOS Corona City Park Design Update 11/21/202412

04. Aquatics Deck
RIOS Corona City Park Design Update 11/21/202413

05. Aerial
RIOS Corona City Park Design Update 11/21/202416

05. Community Canvas - Loop View
RIOS Corona City Park Design Update 11/21/202418

06. Entry
RIOS Corona City Park Design Update 11/21/202419

06. Entry - Drop-Off
RIOS Corona City Park Design Update 11/21/202420
36 Details: Review of proposed alterations to Historic District HD-005 (City Park), a designated historic district listed on the Corona Register of Historic Resources, as part of the Corona City Park Revitalization Project, located at 930 East Sixth Street.

LIST OF CONDITIONS

DEPARTMENT CONTACT
PLANNING Brendan Dalde

1. The project shall comply with all applicable requirements of the Corona Municipal Code (CMC) and ordinances and the relevant Specific Plan, if any, including the payment of all required fees.

2. The project shall comply with the mitigation measures identified in the City Park Revitalization Project EIR Addendum (prepared as an addendum to the 2020-2040 General Plan EIR).

3. The Community Services Department shall comply with the following operational requirements during all outdoor events, including festivals and live concerts, as identified in the City Park Revitalization Project EIR Addendum:
a) Restrict amphitheater sound system output to an average of 90 dBA Leq, averaged over a 15-minute period, at a position located 100 feet from the central lawn or portable stage area and portable movie screen of the park. b) Restrict instantaneous maximum sound levels allowed for live music concerts to 95 dBA Lmax at a position located 100 feet from the central lawn or portable stage area and portable movie screen of the park. c) Noise monitoring will be conducted and monitored and reviewed throughout the event to provide sound technicians with noise data for appropriate sound system mixing board adjustments to ensure compliance with regulations. d) Noise monitoring will be conducted with a handheld sound level meter. The meter shall satisfy the American National Standards Institute (ANSI) standard for Type I or II instrumentation.

4. Informational placards shall be placed in the park to convey the history of the following items; and if the items are physical objects, the placards are to be located in the vicinity of the item they describe. • Founders Monument (aka Founder’s Rock)
• Circa-1913 drinking fountain
• Fig and Bunya Trees (as identified in the project’s Tree Preservation Plan) • Sunkist Air Compressor (steam engine)
• The contribution of women to the City’s agricultural history • Display of at least one “Acorn” style lighting fixture • Development and evolution of City Park
• Community events, recreation, sports, and contributions of Corona’s Mexican American community at City Park. • Civil rights history associated with City Park

5. The existing CHPS marker associated with the former Municipal Plunge shall be retained and located to near the original site.

6. The condition of existing “acorn style” light fixtures within City Park shall be evaluated and, where feasible, preserved or donated to be used elsewhere in the City.

Project Number: MARD2026-0002
Applied: 3/17/2026 Approved:

Closed: Expired:

Status: COMPLETE
Parent Project:

Site Address: 930 E SIXTH ST CORONA, CA 0
City of Corona
400 S Vicentia Ave ,
Description:

Applicant:
1 of 1
Project Conditions
City of Corona
[1] Delja, “CHL # 738 Corona Founders Monument Riverside.” [2] “General 2 — the Circle Corona: City Park.”
City Park Relocation of Historic Resources
To the Historic Preservation Board: March 3, 2026
The City Park Revitalization project envisions a comprehensive redevelopment of City Park, spanning approximately 20.5 acres. It is guided by the City Park Master Plan, which reflects extensive community outreach on desired amenities and improvements. The project includes the construction of a new community center with recreational, administrative, and multipurpose spaces; a state-of-theart aquatic center with lap and activity pools, water features, and support facilities; and a variety of outdoor recreational amenities, including a playground, splash pad, skate park, pump track, basketball courts, and a large turf area for special events. The project also encompasses improved circulation with walking paths and accessible connections, upgraded parking and site utilities, lighting and security enhancements, irrigation and landscaping improvements, and overall site modernization, all designed to provide safe, engaging, and inclusive spaces that meet the community's recreational and social needs of the community.

As a part of the City Park Revitalization project, four (4) historic landmarks are to be reviewed by the Historic Preservation Board.

This letter is submitted in support of our application to relocate the historic landmarks located at City Park, 930 E 6th St, Corona, CA 92879.

This application is made in compliance with section 17.63.120 of the Corona Municipal Code, which states under prohibition, “No person shall alter, relocate or demolish any historic resource, and no permit, entitlement or approval therefore shall be issued, without first submitting a plan for review and obtaining approval.”
We are seeking the Historic Preservation Board’s review and approval of the following items:

1. FOUNDER’S ROCK - The Founders’ Rock is a monument that commemorates the founders who purchased La Sierra Rancho of Bernardo Yorba and the El Temescal Grant of Leandro Serrano on May 4, 1886, leading to the foundation of the citrus colony and town of Corona [1]. It is proposed that the Founders’ Rock be relocated to a prominent location at the front of the new community center.

2. SUNKIST AIR COMPRESSOR - The Sunkist air compressor was part of the Sunkist plant that opened in 1913, helping develop the citrus industry in Corona and California overall, while powering a whistle heard by the community for decades [2]. It is Docusign Envelope ID: 443808C2-767F-4355-B21F-3E80F536860D City of Corona • 400 S. Vicentia Ave. Corona, CA 92882 • (951) 736-2400 proposed that the compressor be relocated to a visible, active area between the skate park and playground, where visitors can easily see and appreciate this historic artifact.

3. DRINKING FOUNTAIN - Also built in 1913, the drinking fountain is a testament to the city’s early development and the desire for central green space, with its design now signifying the evolution of the park. It is proposed that the fountain be relocated to a serene, passive green area, creating a peaceful and respectful setting that honors the park’s legacy.

4. FIG TREE – Ficus macrophylla - The historic fig tree is a living landmark, representing both the city’s heritage and the natural beauty that has long defined the area. Its size, age, and prominence make it a distinctive feature of the landscape, serving as a tangible connection to Corona’s past. It is proposed that the tree be preserved and protected in its current location to ensure its continued presence as a symbol of the city’s history, community identity, and commitment to conserving significant natural and cultural resources.

The attached Relocation Plan identifies the proposed locations of the historic landmarks within the City Park Revitalization Project. All items will be relocated using the utmost care and secured in their new location to ensure compliance with preservation standards.

The project ensures the continued preservation and public appreciation of these historic landmarks for generations to come.

Sincerely,
Donna Finch
Director of Community Services
Attachments: Relocation Plans
Docusign Envelope ID: 443808C2-767F-4355-B21F-3E80F536860D EVCS EVCS EVCS EVCS EVCS EVCS EVCS EVCS EVCS EVCS READY READY EVCS EVCS EVCS READY > EVCS VAN VAN EVCS EVCS READY EV

EV EV READY

EV READY

EV READY

EV READY

EV READY

EV READY

EV READY

EV READY

EV READY

EV READY EV READY EV READY EV READY EV READY EV READY EV READY EV READY EV READY EV READY EV READY EV READY EV READY EV READY EV READY EV READY EV READY EV READY EV READY EV READY EV READY EV READY EV READY EV READY EV READY EV EVCS VAN EV READY EV READY

EV READY

EV READY

EV READY

EV READY

EV READY

EV READY

EV READY

EV READY

EV READY
EV EVCS VAN >

FEC FEC
FEC FEC FEC FEC FEC FEC FEC FEC FEC FEC REF.

FEC FEC FEC FEC
FEC FEC FEC 0 10 2472 144 6'-0" 665 666 667 668 668 668 667 668 667 665 666 666 667 665 666 667 668 669 666 667 668 666 665 666 665 666665 666 665 666 665 666 665 666 665 666 666 665 666 665 665 666 665 666 665 666 666 665 666 665 665 666 666 665 666 665 666 665 667666 668 665 666 666 666 666666 666 666 665665665 666 665 665 666 666 667 666 665 666 665 666 665 666 665 665 666 665 666 666 665666 665666 665 669 667 666 668 666 666 665 664 664 664 665 665665 668 665 668 GB GB GB 668 HB-1 HB-1 1"=40' 0 40' 80' 120' HISTORIC OBJECTS 23202 | CORONA CITY PARK | March 3, 2026 RELOCATED FOUNTAIN - 40'
RELOCATED STEAMENGINE - 374'
RELOCATEDFOUNDER'S ROCK -636'
Docusign Envelope ID: 443808C2-767F-4355-B21F-3E80F536860D REF.

FEC
FEC

FEC FEC
FEC

FEC FEC FEC FEC FEC FEC FEC FEC FEC FEC EVCS
EVCS EVCS EVCS EVCS EVCS EVCS EVCS EVCS EVCS EVCS EVCS EVCS EVCS EVCS EVCS EVCS 48 40 24 16 24 168 TRI-K.P.1 TRI-K.P.1 K.P.1 0 20 20 20 144 10 K.P.1 K.P.1 K.P.1 1"=40' 0 40' 80' 120' OVERALL SITE PLAN 23202 | CORONA CITY PARK | July 10, 2025 FOUNDERS ROCK SUNKIST ENGINE FIG TREE 4 - HISTORIC FIG TREE TO REMAIN IN PLACE 2- SUNKIST ENGINE 3 - DRINKING FOUNTAIN 1 - FOUNDERS ROCK Historic Site Elements DRINKING FOUNTAIN Docusign Envelope ID: 443808C2-767F-4355-B21F-3E80F536860D Certificate Of Completion
Envelope Id: 443808C2-767F-4355-B21F-3E80F536860D Status: Completed Subject: Complete with Docusign: 4. Letter - Scope of Work.docx, 7. Historic Objects Relocation.pdf, 7. ...

Source Envelope:

Document Pages: 4 Signatures: 1 Envelope Originator:

Certificate Pages: 2 Initials: 1 Rachel McLure
AutoNav: Enabled
EnvelopeId Stamping: Enabled
Time Zone: (UTC-08:00) Pacific Time (US & Canada)
400 S Vicentia Ave
Corona, CA 92882
[email protected]
IP Address: 64.29.226.10
Record Tracking
Status: Original
3/4/2026 5:50:27 PM
Holder: Rachel McLure
[email protected]
Location: DocuSign
Security Appliance Status: Connected Pool: StateLocal
Storage Appliance Status: Connected Pool: City of Corona, CA Location: Docusign Signer Events Signature Timestamp
Donna Finch
[email protected]
Community Services Director
Security Level: Email, Account Authentication
(None) Signature Adoption: Pre-selected Style
Using IP Address: 104.34.41.63
Sent: 3/4/2026 5:52:04 PM
Viewed: 3/9/2026 8:10:51 AM
Signed: 3/9/2026 8:12:40 AM
Electronic Record and Signature Disclosure:

Not Offered via Docusign
Rachel McLure
[email protected]

CIP SUPERVISOR
City of Corona - CIP Division
Security Level: Email, Account Authentication
(None)
Signature Adoption: Pre-selected Style
Using IP Address: 64.29.226.10
Sent: 3/4/2026 5:52:03 PM
Viewed: 3/4/2026 5:52:10 PM
Signed: 3/4/2026 5:52:19 PM
Electronic Record and Signature Disclosure:

Not Offered via Docusign
In Person Signer Events Signature Timestamp
Editor Delivery Events Status Timestamp
Agent Delivery Events Status Timestamp
Intermediary Delivery Events Status Timestamp
Certified Delivery Events Status Timestamp
Carbon Copy Events Status Timestamp
Witness Events Signature Timestamp
Notary Events Signature Timestamp
Envelope Summary Events Status Timestamps
Envelope Sent Hashed/Encrypted 3/4/2026 5:52:04 PM
Envelope Summary Events Status Timestamps
Certified Delivered Security Checked 3/4/2026 5:52:10 PM Signing Complete Security Checked 3/4/2026 5:52:19 PM
Completed Security Checked 3/9/2026 8:12:40 AM
Payment Events Status Timestamps
June 2026 | EIR Addendum
State Clearinghouse No. 2018081039

CITY PARK REVITALIZATION PROJECT EIR

ADDENDUM
City of Corona
Prepared for:

City of Corona
Contact: Rachel McLure, CIP Supervisor
400 South Vicentia Avenue
Corona, California 92882
951.736.2400
Prepared by:

PlaceWorks
Contact: Malia Durand, Principal
Emma Haines, Associate
3 MacArthur Place, Suite 1100
Santa Ana, California 92707
714.966.9220
[email protected]
www.placeworks.com

CITY PARK REVITALIZATION PROJECT EIR ADDENDUM

CITY OF CORONA
Table of Contents
June 2026 Page i
Section Page

1. INTRODUCTION.............................................................................................................................. 1

1.1 PURPOSE OF AN ADDENDUM.................................................................................................................1

1.2 PREVIOUS ENVIRONMENTAL DOCUMENTATION........................................................................4

2. ENVIRONMENTAL SETTING ......................................................................................................... 7

2.1 PROJECT LOCATION ....................................................................................................................................7

2.2 ENVIRONMENTAL SETTING....................................................................................................................7

3. PROJECT DESCRIPTION ............................................................................................................ 19

3.1 APPROVED PROJECT..................................................................................................................................19

3.2 PROJECT DESCRIPTION............................................................................................................................19

3.3 DISCRETIONARY APPROVALS ................................................................................................................27

4. ENVIRONMENTAL CHECKLIST .................................................................................................. 29

4.1 BACKGROUND ..............................................................................................................................................29

4.2 ENVIRONMENTAL FACTORS POTENTIALLY AFFECTED..........................................................31

4.3 DETERMINATION (TO BE COMPLETED BY THE LEAD AGENCY)........................................31

4.4 EVALUATION OF ENVIRONMENTAL IMPACTS ..............................................................................32

5. ENVIRONMENTAL ANALYSIS ..................................................................................................... 35

5.1 AESTHETICS...................................................................................................................................................35

5.2 AGRICULTURE AND FORESTRY RESOURCES..................................................................................43

5.3 AIR QUALITY..................................................................................................................................................47

5.4 BIOLOGICAL RESOURCES........................................................................................................................59

5.5 CULTURAL RESOURCES ............................................................................................................................70

5.6 ENERGY...........................................................................................................................................................77

5.7 GEOLOGY AND SOILS...............................................................................................................................83

5.8 GREENHOUSE GAS EMISSIONS ............................................................................................................91

5.9 HAZARDS AND HAZARDOUS MATERIALS .......................................................................................96

5.10 HYDROLOGY AND WATER QUALITY .............................................................................................. 103

5.11 LAND USE AND PLANNING................................................................................................................. 113

5.12 MINERAL RESOURCES............................................................................................................................ 116

5.13 NOISE............................................................................................................................................................. 119

5.14 POPULATION AND HOUSING............................................................................................................. 134

5.15 PUBLIC SERVICES...................................................................................................................................... 137

5.16 RECREATION.............................................................................................................................................. 143

5.17 TRANSPORTATION/TRAFFIC.............................................................................................................. 146

5.18 TRIBAL CULTURAL RESOURCES......................................................................................................... 151

5.19 UTILITIES AND SYSTEM SERVICES................................................................................................... 157

5.20 WILDFIRE..................................................................................................................................................... 165

5.21 MANDATORY FINDINGS OF SIGNIFICANCE................................................................................ 169

6. FINDINGS.................................................................................................................................... 171

7. LIST OF PREPARERS ................................................................................................................ 173 CITY OF CORONA (LEAD AGENCY).................................................................................................................. 173 PLACEWORKS (CEQA CONSULTANT)............................................................................................................... 173

8. REFERENCES............................................................................................................................. 175

CITY PARK REVIT A LIZATION PROJECT EIR ADDENDUM

CITY OF CORONA
Table of Contents
Page ii PlaceWorks

APPENDICES
Appendix A Air Quality, and Greenhouse Gas Analysis
Appendix B Biological Technical Report and MSHCP Consistency Analysis Appendix C Arborist Report
Appendix D Archaeological and Architectural History Resources Inventory and Evaluation Report Appendix E Noise Analysis
Appendix F Vehicle Miles Traveled Screening Assessment
Appendix G Transportation Assessment

CITY PARK REVITALIZATION PROJECT EIR ADDENDUM

CITY OF CORONA
Table of Contents
June 2026 Page iii
List of Figures
Figure Page
Figure 1 Regional Location................................................................................................................................. 9 Figure 2 Local Vicinity.......................................................................................................................................11 Figure 3 Aerial Photograph with Photo Locations.......................................................................................13 Figure 4 Project Site Photographs...................................................................................................................15 Figure 5 Surrounding Uses Photographs........................................................................................................17 Figure 6 Overall Site Plan..................................................................................................................................21 Figure 7 Community Center and Aquatics Center Site Plan .......................................................................23 Figure 8 Horizontal Light Levels at Property Line .......................................................................................41 Figure 9 Approximate Noise Monitoring Locations ..................................................................................121 List of Tables
Table Page
Table 1 Corona City Park Regular Occurring Events Calendar................................................................25 Table 2 Corona City Park Annual Event Calendar......................................................................................25 Table 3 Maximum Daily Regional Construction Emissions......................................................................49 Table 4 Maximum Daily Regional Operation Emissions...........................................................................51 Table 5 Localized Construction Emissions...................................................................................................52 Table 6 Operation-Related Electricity Consumption..................................................................................79 Table 7 Operation-Related Natural Gas Consumption ..............................................................................80 Table 8 Project-Related Operation GHG Emissions..................................................................................92 Table 9 Short-Term Noise Measurements Summary in A-weighted Sound Levels.............................120 Table 10 Project-Related Construction Noise Levels..................................................................................124 Table 11 Weekday Project-Related Increases in Traffic Noise, dBA CNEL at 50 Feet........................126 Table 12 Saturday Project-Related Increases in Traffic Noise, dBA CNEL at 50 Feet.........................126 Table 13 Project-Related Amphitheater Noise, dBA ..................................................................................128 Table 14 Vibration Impact Levels for Typical Construction Equipment................................................130 Table 15 Proposed Increase in Potable Water Demand.............................................................................161 Table 16 Landfill Capacity ...............................................................................................................................163 Table 17 Proposed Increase in Solid Waste Generation.............................................................................163

CITY PARK REVITALIZATION PROJECT EIR ADDENDUM

CITY OF CORONA
Abbreviations and Acronym
Page iv PlaceWorks
AAQS ambient air quality standards
AARIE Archaeological and Architectural Resources Inventory and Evaluation AB Assembly Bill
ADA Americans with Disabilities Act
ADT average daily traffic
amsl above mean sea level
AQMP air quality management plan
BMPs best management practices
CAFE Corporate Average Fuel Economy
CAL FIRE California Department of Forestry and Fire Protection CALGreen California Green Building Standards Code
CalRecycle California Department of Resources, Recycling, and Recovery Caltrans California Department of Transportation
CARB California Air Resources Board
CBC California Building Code
CDE California Department of Education
CDFW California Department of Fish and Wildlife
CEQA California Environmental Quality Act
CFD Corona Fire Department
CNDDB California Natural Diversity Database
CGP Construction General Permit
CMC City Municipal Code
CMP Congestion Management Plan
CNEL community noise equivalent level
CNUSD Corona-Norco Unified School District
CRHR California Register of Historical Resources
CO carbon monoxide
CO2e carbon dioxide equivalent
Corps US Army Corps of Engineers
CPD Corona Police Department
dB decibel
dBA A-weighted decibel
DPM diesel particulate matter

CITY PARK REVITALIZATION PROJECT EIR ADDENDUM

CITY OF CORONA
Abbreviations and Acronyms
June 2026 Page v
DSA Division of the State Architect
DTSC Department of Toxic Substances Control
EAP emergency action plan
Fc foot candles
EIR environmental impact report
EPA United States Environmental Protection Agency
EPO emergency operations plan
FEMA Federal Emergency Management Agency
FHWA Federal Highway Administration
FHSZ Fire Hazard Severity Zone
FTA Federal Transit Administration
GHG greenhouse gases
HVAC heating, ventilating, and air conditioning system
IPCC Intergovernmental Panel on Climate Change
Ldn day-night noise level
Leq equivalent continuous noise level
LCFS low-carbon fuel standard
LRA local responsibility area
LST localized significance thresholds
MBTA Migratory Bird Treaty Act
mgd million gallons per day
MMT million metric tons
MRZ Mineral Resource Zones
MSHCP Multiple Species Habitat Conservation Plan
MT metric ton
MTCO2w metric tons of carbon dioxide equivalent
NAHC Native American Heritage Commission
NRHP National Register of Historic Places
NPDES National Pollutant Discharge Elimination System
NOX nitrogen oxides
O3 ozone
PM particulate matter
ppm parts per million

CITY PARK REVITALIZATION PROJECT EIR ADDENDUM

CITY OF CORONA
Abbreviations and Acronym
Page vi PlaceWorks
PPV peak particle velocity
PRD permit registration documents
PRMMP Paleontological Resources Monitoring and Mitigation Plan RCNM roadway construction noise model
RTA Riverside Transit Agency
RTP/SCS Regional Transportation Plan/ Sustainable Communities Strategy RWQCB Regional Water Quality Control Board
SB Senate Bill
SCAG Southern California Association of Governments
SCAQMD South Coast Air Quality Management District
SLM sound level meter
SoCAB South Coast Air Basin
SOX sulfur oxides
SR State Route
SRA source receptor area [or state responsibility area] SWPPP Storm Water Pollution Prevention Plan
SWRCB State Water Resources Control Board
TCR Tribal Cultural Resources
USFWS United States Fish and Wildlife Service
UWMP urban water management plan
VdB velocity decibels
VHFHSZ very high fire hazard severity zone
VMT vehicle miles traveled
VOC volatile organic compound
WQCP Water Quality Control Plan
June 2026 Page 1

1. Introduction

1.1 PURPOSE OF AN ADDENDUM
This document is an Addendum to the previously certified Environmental Impact Report (EIR) (State Clearinghouse [SCH] No. 2018081039) for the City of Corona General Plan Technical Update (GP), which was certified on June 3, 2020 (referred to as the Approved Project). The purpose of this Addendum is to evaluate whether the proposed Corona City Park Revitalization Project (proposed project) would modify the Approved Project in such a way as to result in new environmental impacts or a substantial increase in the severity of previously identified significant effects or would otherwise trigger a need for subsequent environmental review.

The Draft EIR for the GP was circulated for public review from December 19, 2019, through February 3, 2020. A Final EIR was prepared and was approved on June 3, 2020, by the City of Corona. The 2020 Draft EIR and Final EIR are collectively referred to as the 2020 Certified EIR.

The 2020 Certified EIR, in conjunction with this Addendum, serve as the environmental review for the proposed modifications to the Approved Project, as required by the California Environmental Quality Act (CEQA), Public Resources Code Sections 21000 et seq., and the State CEQA Guidelines (14 California Code of Regulations Sections 15000–15387). This Addendum evaluates the potential environmental impacts associated with the proposed Corona City Park Revitalization Project.

1.1.1 Environmental Procedures
Pursuant to the State CEQA Guidelines, this Addendum focuses on whether implementation of the proposed project would require major revisions to the 2020 Certified EIR due to the potential for new significant environmental effects or a substantial increase in the severity of previously identified significant effects, pursuant to State CEQA Guidelines Section 15162.

Pursuant to Section 21166 of CEQA and Section 15162 of the State CEQA Guidelines, when an EIR has been certified or a negative declaration adopted for a project, no subsequent or supplemental EIR or negative declaration shall be prepared for the project unless the lead agency determines that one or more of the following conditions are met:
(1) Substantial changes are proposed in the project which will require major revisions of the previous EIR or negative declaration due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects;
(2) Substantial changes occur with respect to the circumstances under which the project is undertaken which will require major revisions of the previous EIR or negative declaration

CITY PARK REVITALIZATION PROJECT EIR ADDENDUM

CITY OF CORONA

1. Introduction

Page 2 ends