CA\DD\02000.50105\10005846.1 (CITY ATTY: 01-14)
FIRST AMENDMENT TO
PROFESSIONAL SERVICES AGREEMENT
BETWEEN THE CITY OF CORONA
AND
ALBERT A. WEBB ASSOCIATES
(CONSULTING DESIGN SERVICES – DIGESTER EQUIPMENT REHABILITATION AND ELECTRICAL UPGRADE PROJECT FOR WRF 1, RFP 25-034AT)
1. PARTIES AND DATE.
This First Amendment to the Professional Services Agreement (“First Amendment”) is made and entered into this 7th day of October, 2026 by and between the City of Corona (“City”) and Albert A. Webb Associates, a California corporation (“Consultant”). City and Consultant are sometimes individually referred to as “Party” and collectively as “Parties” in this First Amendment.
2. RECITALS.
2.1 Agreement. City and Consultant entered into that certain Professional Services Agreement dated June 18, 2025 (“Agreement”), whereby Consultant agreed to provide Consulting Design Services for Digester Equipment Rehabilitation and Electrical Upgrade project.
2.2 Amendment. City and Consultant desire to amend the Agreement for the first time to (1) increase total compensation, (2) replace Exhibit “A” with Exhibit “A-1” (Scope of Services), and (3) replace Exhibit “C” with Exhibit “C-1” (Compensation).
3. TERMS.
3.1 Rates & Total Compensation. Section. 3.3.1 (Rates & Total Compensation) and Exhibit “C” (Compensation) of the Agreement is hereby deleted in its entirety and replaced with the following:
“3.3.1 Rates & Total Compensation. Consultant shall
receive compensation, including authorized reimbursements, for all Services rendered under this Agreement at the rates set forth in Exhibit “C” attached hereto and incorporated herein by reference. The total compensation, including authorized reimbursements, shall not exceed Six Hundred Forty Eight Thousand Two Hundred Seventy Eight Dollars and Zero Cents ($648,278.00) (“Total Compensation”) without written approval of City’s Representative. Extra Work may be authorized, as described below, and if authorized, will be compensated at the rates and manner set forth in this Agreement.”
Docusign Envelope ID: 5762ED2A-46A7-879A-8094-119694495CA0 CA\DD\02000.50105\10005846.1 2 (CITY ATTY: 01-14)
3.2 Exhibit “A-1”. Exhibit “A” (Scope of Services) of the Agreement is hereby deleted in its entirety and replaced with Exhibit “A-1” (Scope of Services) attached hereto and incorporated herein by reference.
3.3 Exhibit “C-1”. Exhibit “C” (Compensation) of the Agreement is hereby deleted in its entirety and replaced with Exhibit “C-1” (Compensation) attached hereto and incorporated herein by reference.
3.4 Continuing Effect of Agreement. Except as amended by this First Amendment, all provisions of the Agreement shall remain unchanged and in full force and effect.
From and after the date of this First Amendment, whenever the term “Agreement” appears in the Agreement, it shall mean the Agreement as amended by this First Amendment.
3.5 Adequate Consideration. The Parties hereto irrevocably stipulate and agree that they have each received adequate and independent consideration for the performance of the obligations they have undertaken pursuant to this First Amendment.
3.6 Counterparts. This First Amendment may be executed in duplicate originals, each of which is deemed to be an original, but when taken together shall constitute but one and the same instrument.
[SIGNATURES ON FOLLOWING PAGE]
Docusign Envelope ID: 5762ED2A-46A7-879A-8094-119694495CA0 CA\DD\02000.50105\10005846.1 3 (CITY ATTY: 01-14)
CITY’S SIGNATURE PAGE
FOR
FIRST AMENDMENT TO
PROFESSIONAL SERVICES AGREEMENT
BETWEEN THE CITY OF CORONA
AND ALBERT A. WEBB ASSOCIATES
(CONSULTING DESIGN SERVICES – DIGESTER EQUIPMENT REHABILITATION AND ELECTRICAL UPGRADE PROJECT FOR WRF 1, RFP 25-034AT) IN WITNESS WHEREOF, the Parties have entered into this First Amendment to Professional Services Agreement as of the date noted on the first page of the Amendment.
CITY OF CORONA
By: _________________________
Tom Moody
Utilities Director
Reviewed By: _________________
Katie Hockett
Assistant Utilities Director
Reviewed By: _________________
Nicole McDaniel
Deputy Finance Director
Attest:
_________________________
Sylvia Edwards, City Clerk
City of Corona
Docusign Envelope ID: 5762ED2A-46A7-879A-8094-119694495CA0 CA\DD\02000.50105\10005846.1 4 (CITY ATTY: 01-14)
CONSULTANT’S SIGNATURE PAGE
FOR
FIRST AMENDMENT TO
PROFESSIONAL SERVICES AGREEMENT
BETWEEN THE CITY OF CORONA
AND ALBERT A. WEBB ASSOCIATES
(CONSULTING DESIGN SERVICES – DIGESTER EQUIPMENT REHABILITATION AND ELECTRICAL UPGRADE PROJECT FOR WRF 1, RFP 25-034AT) IN WITNESS WHEREOF, the Parties have entered into this First Amendment to Professional Services Agreement as of the date noted on the first page of the Amendment.
ALBERT A. WEBB ASSOCIATES
a California corporation
By: _________________________
Brian Knoll
Chief Operations Officer
By: _________________________
Todd Smith
Chief Financial Officer
Docusign Envelope ID: 5762ED2A-46A7-879A-8094-119694495CA0 CA\DD\02000.50105\10005846.1
5 (BB&K: 9-10)
27157.11000\2955190.2
EXHIBIT "A-1"
Consultant shall prepare design and bid documents for the removal and replacement of existing sludge circulation pumps, heat exchangers, and related equipment. Additionally, the Consultant shall handle the Motor Control Center (MCC) design at Water Reclamation Facility (WRF) 1 for equipment related to three mesophilic anaerobic digesters, each with a capacity of 514,000 gallons (50 ft diameter, 30 ft height).
Design Requirements:
The design documents for the equipment replacement at WRF 1 must include:
• Pumps: All pumps shall be Vaughan (Sludge Pumps – Quantity 3). • Motor Operated Valves (MOVs): All MOVs shall be Auma. • Motor Control Center (MCC): The Motor Control Center shall be Allen Bradley housed in an Integrated Power Center (IPC). The section should be a Duluth non-bussed Remote Terminal Unit (RTU).
• Heat Exchangers: The heat exchangers shall:
o Maintain digester temperatures between 95°F and 100°F year-round. o Be designed for a maximum working pressure of 50 PSI at 300°F. o Have minimum design metal temperatures of 20°F at 50 PSI. o Be sourced from any reputable brand (Quantity 3). Current heat exchangers are Alfa Laval Thermal Inc.
• Concrete Pad: Concrete pad footings shall be constructed to City of Corona Standards.
The design documents must also detail the demolition process, including all electrical and conduit, as well as anticipated utility shutdowns and switchovers.
Scope of Work:
Sludge Pumps and Discharge Line from Gravity Belt Thickener to Digester Feed • Install three (3) new thickened sludge pumps.
• Replace two (2) existing Gravity Belt Thickener (GBT) horizontal sludge conveyors with one common conveyance or collection mechanism below platform grating. • Replace the existing thickened sludge discharge line with a new glass lined pipe connecting all three pumps to digester feed valves.
• Remove the staircase in the designated area.
The new discharge line shall have a 120 GPM max capacity for thickened sludge.
Digester 1,2, and 3
Docusign Envelope ID: 5762ED2A-46A7-879A-8094-119694495CA0 CA\DD\02000.50105\10005846.1
6 (BB&K: 9-10)
27157.11000\2955190.2
• Remove and replace existing feed valves, transfer valves, discharge valves, associated piping, and concrete pad as needed.
Provide ability to transfer digester sludge between all digesters.
Digester 2 and 3 – Mixing Pump Suction Line
• Relocate the suction line to a new location.
• The new suction line shall be installed 90 degrees downward, connecting to the existing pipe through the ground.
Digester 3
• Install internal mixing nozzles.
• Remove external mixing piping.
• Remove the existing concrete pad.
Electrical Upgrades
• Provide demolition plan and new design for Motor Control Centers (MCC) for all three (3) digesters mixing and pumping system
• Design must include single line electrical drawings P&ID with city standard signals. • Must include an electrical demolition plan of all electrical components demoed to the source.
Heat Exchangers and Sludge Pumps
• Relocate digester feed valves, digester transfer valves, digester discharge valves, heat exchangers, heated sludge pumps, and associated piping for Digesters 1,2, and 3 to the designated area.
• Optimize the new layout to:
• Align equipment for easy access.
• Position digester feed MOVs adjacent to heat exchangers and pumps for operational efficiency.
• Move digester transfer valves, discharge valves, associated piping, and pumps to the designated area.
• Maintain mixing pumps in their current location.
• Optional pricing to house equipment in block building with an internal bridge crane and a roller door for equipment access.
Additional Tasks
• Incorporate previously prepared design for replacement of boilers including electrical connections
• Design to replace existing building which no longer meets seismic code Docusign Envelope ID: 5762ED2A-46A7-879A-8094-119694495CA0 CA\DD\02000.50105\10005846.1
7 (BB&K: 9-10)
27157.11000\2955190.2
Water Reclamation Facility (WRF) 1A
Primary 1A and Blower Room MCC Replacement
Blower Replacement and Turblex Controls Upgrade
1. Replace and relocate Primary 1A MCC with a new Allen Bradley system to meet the current City of Corona Standards. Relocate the new Primary 1A MCC to the Blower MCC building. Relocate conduits and replace all wiring with new, per current Standards, to maintain operations of controlled equipment at Primary Clarifiers 1 and 2. Upgrade Turblex Controls to meet the new City of Corona Standards.
2. Replace and upgrade Hoffman blowers and replace Blower MCC with a new Allen Bradley system to meet current City of Corona Standards.
3. MCCs shall be housed in an existing building that will need to be modified.
4. Provide new HVAC climate control to protect all new equipment in the Blower MCC room/building.
5. Provide cutover sequence.
Project Services and Timelines:
Design Completion to 30%, 90%, and 100%
• Surveying underground utility and facility location (potholing or ground-penetrating radar – GPR).
• Design of site, civil, mechanical, electrical and instrumentation plans and equipment locations, including transmissions lines to digesters, electrical service lines, and equipment service lines.
• Evaluation, sizing, and design for the removal and replacement of heat exchangers, sludge pumps, valves with motor-operated actuators, piping, and circulating pumps to maintain optimal digester temperature (98°F).
• Attendance at a project overview and requirements meetings with City staff prior to commencing the design.
Final Plans and Specifications - All final plans and specifications, including detailed documents required for bidding purposes, shall be completed within 90 days following the City’s review of the draft documents. This task includes obtaining all necessary signatures and wet stamps.
As Built Documentation - Consultant shall review the contractor’s as-built drawing and convert them to AutoCAD format. The drawings shall be submitted for review to the City’s representative and revised as necessary. Updated project specifications incorporating as-built information shall also be provided.
Docusign Envelope ID: 5762ED2A-46A7-879A-8094-119694495CA0 CA\DD\02000.50105\10005846.1
8 (BB&K: 9-10)
27157.11000\2955190.2
EXHIBIT "C-1"