Cities Index.
Attachment 6- Traffic Calming Plan

Coronado City Council
March 19, 2024

Document
Attachment 6- Traffic Calming Plan
Meeting
March 19, 2024
Body
Coronado City Council
Original file
52 KB
Text extracted from the city's file for reading and search. Open the original on coronado.primegov.com. That file is the official record.

Attachment 6
Traffic Calming Plan January 2024
Guiding Principles:

1. Traffic Calming – The City of Coronado will Install traffic calming measures to increase safety and enhance the livability of communities.
● Use traffic calming techniques in appropriate locations to reduce vehicle speeds or discourage shortcutting traffic.
● Choose traffic calming devices to best fit the situation for which it is intended. ● Place traffic calming devices so that the full benefit of calming will be realized with little or no negative effect upon the overall safety or quality of the roadway. ● Design traffic calming devices appropriately, including consideration for accessibility, drainage, underground utilities, adequate visibility, the needs of emergency, sanitation, and transit vehicles, and landscaping. ● Weigh the undesired effects of traffic calming devices (increased travel times, emergency response times, noise, and traffic diversion) against their prescribed benefits.”

2. Neighborhood Streets – The City of Coronado will Design or retrofit streets to improve walkability, strengthen connectivity, and enhance community identity. Emphasize the provision of high-quality pedestrian and bikeway connections to village centers, and local schools.”
Suggested locations for traffic calming:
● Streets adjacent to recreational and educational land uses ● Areas with previously noted existing safety concerns
● Locations with a history of collisions
● 1st St at B Ave, C Ave, Orange Ave and D Ave
● 2nd St at A Ave, B Ave, D Ave and F Ave
● Alameda Blvd at 7th St, 8th St, 10th St, Olive Ave, Marina Ave, G Ave and Ocean Blvd ● 10th St between D Ave and Alameda Blvd
● Olive Ave between 7th St and 10th St
● Suggested pilot project corridors are 1st Street and 2nd Street due to the combination of recreational land use, traffic collision clustering, and neighborhood traffic to Gate 2 Carrier Gate and Ferry Landing
Suggested Traffic Calming Treatments:
● Curb Extensions
● Raised Crosswalks
● Speed Lumps
● Mini Neighborhood Traffic Circles
Other preferred methods: Speed tables, Raised Median/Pedestrian Refuges, Realigned T Intersections

← All documents from this meeting