Exhibit A
EMS/AMBULANCE SERVICES FEE SCHEDULE
City of Coronado
Resolution 8472 adopted May 3, 2011 CURRENT ADJUSTED
FY 2023-24 FY 2024-25
FEE # USER FEE Effective 7/1/23 Effective 7/1/24
1 ALS Transport - Resident (plus supplies) $ 1,282 $ 1,347 2 ALS Transport - Non-Resident (plus supplies) $ 1,282 $ 1,347 3 BLS Transport - Resident (plus supplies) $ 1,141 $ 1,199 4 BLS Transport - Non-Resident (plus supplies) $ 1,141 $ 1,199 5 Treat and Release (plus supplies) - eliminated 3/20/18 6 Mileage (per mile) $ 28 $ 29
7 Oxygen (per incident) $ 105 $ 110
8 CPR Classes $ 33 $ 35
9 Incident Report *$8.00 *$8.00
NOTE: Fees with * are not subject to CPI adjustment
Resolution No. 2024-16
Exhibit A
Exhibit B
POLICE SERVICES FEE SCHEDULE
City of Coronado
Resolution 8721 (2015), 2020-51 CURRENT ADJUSTED
FY 2023-24 FY 2024-25
FEE # USER FEE Effective 7/1/23 Effective 7/1/24
Business and Service Permits
1 Business Operations Permit (investigation fee) $ 56 $ 59 2 Gun Dealer - Permit Application $ 264 $ 278
3 Gun Dealer - Permit Renewal $ 81 $ 86
4 Massage Permits- Annual - Individual Masseuse $ 94 $ 99 5 Massage Permit Replacement $ 72 $ 76
6 Taxi Inspection - Annual Inspection (including medallion) $ 184 $ 194 7 Taxi Reinspection $ 32 $ 35
8 Taxi Medallion Replacement $ 12 $ 13
9 Taxi Driver Permit - Annual $ 72 $ 76
10 Taxi Driver Permit Replacement $ 63 $ 67
Misc Police Service Fees
11 Initial or Annual Alarm Permit $0 $0
False Alarms: billing based on number of infractions within calendar year 12 First false alarm For 1st, 2nd and/or 3rd false alarm, 13 Second false alarm If permit not on file, assess 14 Third false alarm $35.00 permit fee ONLY. 15 Fourth false alarm $ 124 $ 131
16 Each additional alarm thereafter $ 124 $ 131
17 Late Fee $ 62 $ 65
18 Good Guy Letter (Visa clearance, etc.) $ 31 $ 33
19 House or Vacation check (services by volunteers) $0 $0 20 Second or Subsequent Response to a Party or Gathering which is a Disturbance of the peace
(prior notification concerning service fee required)
Actual Cost Actual Cost
21 Civil Subpoena (limited by the state) - per Officer In accordance with State law
In accordance with
State law
22 Subpoena Duces Tecum - per 15 minutes
(Per Evidence Code §1563)
$ 6 $ 6
23 Subpoena Duces Tecum - per page
(Per Evidence Code §1563)
$0 $0
Parking Decal Program:
24 Parking Decal Processing /Issuance $0 $0
25 Permit Parking Decal - Replacement $0 $0
Parking Rates and Citations:
Standard Parking Metersfor gen. parking
26 1 hour $0 $0
27 30 minutes N/A N/A
28 24 minutes $0 $0
29 12 minutes $0 $0
30 06 minutes N/A N/A
31 Credit Card Convenience Fee $0 $0
32 Meter Rentals - per meter, per day $40 per applicant plus $4 per meter
per day
$40 per applicant plus
$4 per meter per day
Resolution No. 2024-16
Exhibit B
Exhibit B
POLICE SERVICES FEE SCHEDULE
City of Coronado
Resolution 8721 (2015), 2020-51 CURRENT ADJUSTED
FY 2023-24 FY 2024-25
FEE # USER FEE Effective 7/1/23 Effective 7/1/24
32a Parking Penalty (Any violation of Title 56, except CMC 56.30.200 or 56.30.210) *$45 *$45 32b Parking Penalty (CMC 56.30.200 or 56.30.210) *$81.50 *$81.50 Traffic and Vehicle Fees:
33 Oversize Vehicle Guest Parking Permit $0 $0
34 Vehicle Tow/Impound Release $ 130 $ 137
35 Repossession Fee $ 18 $ 19
Animal Services
Dog License:
36 Neutered/Spayed - 1 Year 1$ 20 $ 21
37 Neutered/Spayed - 2 Year $ 35 $ 36
38 Neutered/Spayed - 3 Year $ 47 $ 50
39 Unaltered - 1 Year 1$ 40 $ 42
40 Unaltered - 2 Year $ 69 $ 73
41 Unaltered - 3 Year $ 95 $ 99
Cat License:
42 Neutered/Spayed - 1 Year $ 7 $ 8
43 Neutered/Spayed - 2 Year $ 14 $ 14
44 Neutered/Spayed - 3 Year $ 18 $ 19
45 Unaltered - 1 Year $ 15 $ 15
46 Unaltered - 2 Year $ 25 $ 26
47 Unaltered - 3 Year $ 33 $ 34
48 License Late Fee 1$ 20 $ 21
49 License Replacement/Transfer Fee 1$ 10 $ 11
50 Dangerous Animal Hearing Process $0 $0
51 Relinquishment Fee 1$ 40 $ 42
Unaltered Cat Relinquishment Fee (plus care fee):
53 Neuter 2$ 50 $ 53
54 Spay 2$ 85 $ 89
Unaltered Dog Relinquishment Fee (plus care fee):
56 Neuter under 40lbs 2$ 110 $ 116
57 Neuter 41 to 80lbs 2$ 138 $ 145
58 Neuter over 80lbs 2$ 160 $ 168
59 Spay under 40lbs 2$ 120 $ 126
60 Spay 41 to 80lbs 2$ 150 $ 158
61 Spay over 80lbs 2$ 183 $ 192
62 Owned Animal Disposal $ 60 $ 64
Impound Release Fees(plus daily housing fees and cost of required medical care):
63 First Occurrence 1 $45.00 plus
licensing fee if
unlicensed
$45.00 pluslicensing
fee if unlicensed
64 Second Occurrence 1 $55.00 plus
licensing fee if
unlicensed
$55.00 pluslicensing
fee if unlicensed
Resolution No. 2024-16
Exhibit B
Exhibit B
POLICE SERVICES FEE SCHEDULE
City of Coronado
Resolution 8721 (2015), 2020-51 CURRENT ADJUSTED
FY 2023-24 FY 2024-25
FEE # USER FEE Effective 7/1/23 Effective 7/1/24
65 Third Occurrence $75.00 plus
licensing fee if
unlicensed
$75.00 plus licensing
fee if unlicensed
66 Fourth Occurrence (Fee + Municipal Code Violation / Fine) 3 $85.00 plus licensing fee if
unlicensed
$85.00 pluslicensing
fee if unlicensed
67 Fifth Occurrence (Fee + Municipal Code Violation/Fine) 3 $95.00 plus licensing fee if
unlicensed
$95.00 pluslicensing
fee if unlicensed
68 Animal Care and Support Fee (per day in shelter) 4$ 35 $ 35 69 Microchip Fee $25 (R) $25 (R)
$30 (NR) $30 (NR)
70 RESERVED
Records
71 Crime Reports - Victim or Parties Involved
(Per Government Code §6253(b))
$0 $0
72 Crime Reports- All Others $ 8 $ 8
73 Incident Reports (CAD) - Victim or Parties Involved
(Per Government Code §6253(b))
$0 $0
74 Incident Reports (CAD) - All Others $ 8 $ 8
75 Traffic Collision Report - Victim or Parties Involved (Per Government Code §6253(b))
$0 $0
76 RESERVED
77 Traffic Collision Report - All Others $ 8 $ 9
78 DVD (video) disk (cost to reproduce) $ 25 $ 27
79 Dispatch (audio) CD disk (cost to reproduce) $ 25 $ 27 Notes: 1 Bring to parity with other County Shelters 2
This fee includes additional dollars to defray costs to spay/neuter an unaltered animal being relinquished. With a proposed $40 relinquishement fee, this number needs to increase commensurately 3
Fee should continue to increase with each violation 4 Reflects increased cost of care while in a shelter Resolution No. 2024-16
Exhibit B
Exhibit C
WASTEWATER CAPACITY FEE SCHEDULE
City of Coronado
NOTE: Fees to be adjusted annually by the Engineering News Record Construction Cost Index for Los Angeles.
CURRENT ADJUSTED
FY 2023-24 FY 2024-25
USER FEE EDUs Effective 7/1/23 Effective 7/1/24
A. DWELLING UNITS AND HABITABLE/LIVING UNITS
1. Each single-family dwelling unit 1 $ 7,360 $ 7,735
2. Each dwelling unit of a multiple-family dwelling, apartment, condominium, or townhouse regardless of the number of
bedrooms
0.8 $ 5,887 $ 6,187
3. Each living/habitable unit
(motel, motor hotel, hotel, apartment hotel, lodging house, carriage house, or boarding house without cooking facilities)
0.35 $ 2,556 $ 2,686
4. Each hotel space with a kitchenette; Accessory Dwelling Unit 0.6 $ 4,417 $ 4,642
5. Each space, within a facility, that is available for inhabited mobile homes, trailers, campers, or camp cars
0.65 $ 4,784 $ 5,027
B. COMMERCIAL BUSINESSES
1. Food Service Establishments:
a. Low impact food establishment
(take-out restaurants with disposable utensils, no
dishwasher and garbage disposal, and no public restrooms)
1.5 $ 11,042 $ 11,605
b. Takeout/eat-in restaurants:
(i) with disposable utensils, but with seating and public restrooms. (Minimum 3 EDUs with 18 seat credit)
3 $ 22,082 $ 23,208
(ii) with re-usable utensils, seating and public restrooms. (Minimum 3 EDUs with 18 seat credit)
3 $ 22,082 $ 23,208
(iii) Add for each additional 6-seat unit or fraction thereof 1 $ 7,360 $ 7,735
2. Each Commercial Establishment 1.1 $ 8,085 $ 8,497
C. OTHER
1. Boat slips/berths that are directly connected to sanitary sewer system
0.15 $ 1,135 $ 1,192
2. Each marina pump out facility 1.1 $ 8,085 $ 8,497
3. Any use not listed above will be dealt with on a case by case basis.
N/A
Resolution No. 2024-16
Exhibit C
Exhibit D
BUILDING PERMIT FEE SCHEDULE
City of Coronado CURRENT
FY 2023-24
Effective: 7/1/2023
ADJUSTED
FY 2024-25
Effective: 7/1/2024
Fee #
ICC (UBC)
Use Type Occupancy
Size Basis
(sq. ft.) Plan Check Inspection Plan Check Inspection
1 A-1,2,3 Assembly Group (A-1, A-2, A-3) 500 $ 1,878 $ 2,915 $ 1,973 $ 3,064 Complete 2,000 $ 2,643 $ 3,503 $ 2,778 $ 3,681
5,000 $ 4,010 $ 4,582 $ 4,214 $ 4,816
10,000 $ 5,819 $ 5,376 $ 6,116 $ 5,650
25,000 $ 9,421 $ 6,613 $ 9,902 $ 6,950
2 A-1,2,3 Assembly Group (A-1, A-2, A-3) 500 $ 1,693 $ 2,618 $ 1,780 $ 2,751 Shell 2,000 $ 2,410 $ 3,150 $ 2,533 $ 3,311
5,000 $ 3,619 $ 4,126 $ 3,803 $ 4,336
10,000 $ 5,298 $ 4,789 $ 5,568 $ 5,033
25,000 $ 8,745 $ 5,871 $ 9,191 $ 6,170
3 A-1,2,3 Assembly Group (A-1, A-2, A-3) 250 $ 627 $ 1,394 $ 659 $ 1,465 TI 1,000 $ 1,030 $ 1,681 $ 1,083 $ 1,767
2,500 $ 1,980 $ 2,227 $ 2,081 $ 2,340
5,000 $ 3,528 $ 2,552 $ 3,708 $ 2,682
12,500 $ 7,040 $ 3,124 $ 7,399 $ 3,284
4 A-4,5 Assembly: Spectator Seating (indoor) 750 $ 1,785 $ 2,915 $ 1,876 $ 3,064 Complete 3,000 $ 2,655 $ 3,515 $ 2,791 $ 3,694
7,500 $ 4,166 $ 4,596 $ 4,378 $ 4,830
15,000 $ 6,117 $ 5,402 $ 6,429 $ 5,677
37,500 $ 10,436 $ 6,637 $ 10,968 $ 6,976
5 A-4,5 Assembly: Spectator Seating (indoor) 750 $ 1,018 $ 2,252 $ 1,070 $ 2,367 TI 3,000 $ 1,576 $ 2,735 $ 1,656 $ 2,874
7,500 $ 2,356 $ 3,631 $ 2,476 $ 3,816
15,000 $ 3,528 $ 4,271 $ 3,708 $ 4,489
37,500 $ 6,117 $ 5,271 $ 6,429 $ 5,540
6 B Small Restaurant (<50 occ.) 250 $ 1,238 $ 2,682 $ 1,301 $ 2,819 Complete 1,000 $ 1,953 $ 3,228 $ 2,053 $ 3,393
2,500 $ 2,825 $ 4,205 $ 2,969 $ 4,419
5,000 $ 4,126 $ 4,946 $ 4,336 $ 5,198
12,500 $ 5,480 $ 6,066 $ 5,759 $ 6,375
7 B Small Restaurant (<50 occ.) 250 $ 1,537 $ 2,215 $ 1,615 $ 2,328 Shell 1,000 $ 2,252 $ 2,655 $ 2,367 $ 2,791
2,500 $ 3,450 $ 3,476 $ 3,626 $ 3,653
5,000 $ 5,220 $ 4,035 $ 5,486 $ 4,241
12,500 $ 8,576 $ 4,946 $ 9,014 $ 5,198
8 B Small Restaurant (<50 occ.) 250 $ 614 $ 1,329 $ 645 $ 1,397 TI 1,000 $ 1,018 $ 1,603 $ 1,070 $ 1,685
2,500 $ 1,967 $ 2,110 $ 2,067 $ 2,217
5,000 $ 3,515 $ 2,434 $ 3,694 $ 2,559
12,500 $ 7,028 $ 2,994 $ 7,387 $ 3,146
9 B Offices, Medical, Professional, etc. 500 $ 2,031 $ 2,708 $ 2,135 $ 2,846 Complete 2,000 $ 2,215 $ 3,294 $ 2,328 $ 3,462
5,000 $ 4,283 $ 4,308 $ 4,502 $ 4,527
10,000 $ 6,911 $ 5,113 $ 7,263 $ 5,374
25,000 $ 14,301 $ 6,313 $ 15,030 $ 6,635
Resolution No. 2024-16
Exhibit D
Exhibit D
BUILDING PERMIT FEE SCHEDULE
City of Coronado CURRENT
FY 2023-24
Effective: 7/1/2023
ADJUSTED
FY 2024-25
Effective: 7/1/2024
Fee #
ICC (UBC)
Use Type Occupancy
Size Basis
(sq. ft.) Plan Check Inspection Plan Check Inspection
10 B Offices, Medical, Professional, etc. 500 $ 1,733 $ 1,799 $ 1,822 $ 1,891 Shell 2,000 $ 1,992 $ 2,175 $ 2,094 $ 2,286
5,000 $ 3,983 $ 2,801 $ 4,186 $ 2,944
10,000 $ 6,571 $ 3,384 $ 6,907 $ 3,557
25,000 $ 11,452 $ 4,192 $ 12,036 $ 4,405
11 B Offices, Medical, Professional, etc. 150 $ 809 $ 1,290 $ 850 $ 1,356 TI 600 $ 1,108 $ 1,550 $ 1,165 $ 1,629
1,500 $ 1,433 $ 2,057 $ 1,506 $ 2,162
3,000 $ 1,824 $ 2,371 $ 1,917 $ 2,492
7,500 $ 4,022 $ 2,915 $ 4,227 $ 3,064
12 E Educational Building K-12 500 $ 2,110 $ 2,865 $ 2,217 $ 3,012 Complete 2,000 $ 3,163 $ 3,450 $ 3,325 $ 3,626
5,000 $ 5,037 $ 4,504 $ 5,293 $ 4,734
10,000 $ 7,561 $ 5,298 $ 7,946 $ 5,568
25,000 $ 13,026 $ 6,523 $ 13,691 $ 6,855
13 E Educational Building K-12 500 $ 1,785 $ 2,552 $ 1,876 $ 2,682 Shell 2,000 $ 2,552 $ 3,060 $ 2,682 $ 3,216
5,000 $ 3,880 $ 4,010 $ 4,078 $ 4,214
10,000 $ 5,468 $ 4,662 $ 5,746 $ 4,899
25,000 $ 8,928 $ 5,701 $ 9,384 $ 5,992
14 E Educational Building K-12 150 $ 1,134 $ 1,225 $ 1,192 $ 1,288 TI 600 $ 1,654 $ 1,487 $ 1,738 $ 1,563
1,500 $ 2,279 $ 1,953 $ 2,396 $ 2,053
3,000 $ 2,879 $ 2,279 $ 3,026 $ 2,396
7,500 $ 6,625 $ 2,801 $ 6,963 $ 2,944
15 I-1 Medical/24 Hour Care 500 $ 2,031 $ 2,813 $ 2,135 $ 2,956 Complete 2,000 $ 3,270 $ 3,398 $ 3,436 $ 3,571
5,000 $ 6,860 $ 4,426 $ 7,209 $ 4,652
10,000 $ 8,316 $ 5,220 $ 8,741 $ 5,486
25,000 $ 12,297 $ 6,416 $ 12,924 $ 6,744
16 I-1 Medical/24 Hour Care 500 $ 1,812 $ 2,578 $ 1,904 $ 2,710 Shell 2,000 $ 2,813 $ 3,085 $ 2,956 $ 3,243
5,000 $ 5,546 $ 4,049 $ 5,829 $ 4,255
10,000 $ 6,926 $ 4,710 $ 7,279 $ 4,951
25,000 $ 10,814 $ 5,766 $ 11,365 $ 6,060
17 I-1 Medical/24 Hour Care 100 $ 964 $ 1,302 $ 1,013 $ 1,369 TI 400 $ 1,316 $ 1,564 $ 1,383 $ 1,644
1,000 $ 1,681 $ 2,072 $ 1,767 $ 2,177
2,000 $ 2,410 $ 2,383 $ 2,533 $ 2,505
5,000 $ 3,503 $ 2,929 $ 3,681 $ 3,078
18 I-4 Day Care Facility 250 $ 1,433 $ 2,006 $ 1,506 $ 2,108 Complete 1,000 $ 1,878 $ 2,422 $ 1,973 $ 2,546
2,500 $ 2,344 $ 3,138 $ 2,464 $ 3,298
5,000 $ 3,410 $ 3,736 $ 3,584 $ 3,927
12,500 $ 5,701 $ 4,608 $ 5,992 $ 4,843
Resolution No. 2024-16
Exhibit D
Exhibit D
BUILDING PERMIT FEE SCHEDULE
City of Coronado CURRENT
FY 2023-24
Effective: 7/1/2023
ADJUSTED
FY 2024-25
Effective: 7/1/2024
Fee #
ICC (UBC)
Use Type Occupancy
Size Basis
(sq. ft.) Plan Check Inspection Plan Check Inspection
19 I-4 Day Care Facility 100 $ 627 $ 1,277 $ 659 $ 1,342 TI 400 $ 823 $ 1,537 $ 864 $ 1,615
1,000 $ 1,134 $ 2,031 $ 1,192 $ 2,135
2,000 $ 1,381 $ 2,356 $ 1,451 $ 2,476
5,000 $ 2,031 $ 2,891 $ 2,135 $ 3,039
20 M Retail Sales 500 $ 1,746 $ 2,500 $ 1,835 $ 2,628
Complete 2,000 $ 2,448 $ 2,994 $ 2,573 $ 3,146
5,000 $ 4,413 $ 3,931 $ 4,638 $ 4,132
10,000 $ 5,077 $ 4,569 $ 5,336 $ 4,802
25,000 $ 6,000 $ 5,609 $ 6,306 $ 5,895
21 M Retail Sales 500 $ 1,225 $ 2,344 $ 1,288 $ 2,464
Shell 2,000 $ 1,770 $ 2,837 $ 1,860 $ 2,982
5,000 $ 3,528 $ 3,685 $ 3,708 $ 3,873
10,000 $ 3,814 $ 4,426 $ 4,009 $ 4,652
25,000 $ 4,569 $ 5,480 $ 4,802 $ 5,759
22 M Retail Sales 100 $ 860 $ 1,290 $ 904 $ 1,356
TI 400 $ 1,134 $ 1,550 $ 1,192 $ 1,629
1,000 $ 1,381 $ 2,057 $ 1,451 $ 2,162
2,000 $ 1,770 $ 2,371 $ 1,860 $ 2,492
5,000 $ 2,344 $ 2,915 $ 2,464 $ 3,064
23 S-1 Repair Garage & Service St 200 $ 1,409 $ 2,604 $ 1,481 $ 2,737 Complete 800 $ 1,770 $ 3,138 $ 1,860 $ 3,298
2,000 $ 2,097 $ 4,100 $ 2,204 $ 4,309
4,000 $ 2,488 $ 4,830 $ 2,615 $ 5,077
10,000 $ 3,631 $ 5,935 $ 3,816 $ 6,238
24 S-1 Repair Garage & Service St 200 $ 1,055 $ 2,136 $ 1,108 $ 2,245 Shell 800 $ 1,343 $ 2,552 $ 1,411 $ 2,682
2,000 $ 1,576 $ 3,332 $ 1,656 $ 3,502
4,000 $ 1,941 $ 3,892 $ 2,040 $ 4,091
10,000 $ 2,915 $ 4,764 $ 3,064 $ 5,007
25 S-1 Repair Garage & Service St 100 $ 809 $ 1,302 $ 850 $ 1,369 TI / Remodel 400 $ 1,096 $ 1,564 $ 1,152 $ 1,644
1,000 $ 1,394 $ 2,072 $ 1,465 $ 2,177
2,000 $ 2,097 $ 2,383 $ 2,204 $ 2,505
5,000 $ 2,383 $ 2,929 $ 2,505 $ 3,078
26 S-1 Storage (Moderate Hazard) 500 $ 1,487 $ 2,760 $ 1,563 $ 2,901 Complete 2,000 $ 1,941 $ 3,332 $ 2,040 $ 3,502
5,000 $ 2,475 $ 4,349 $ 2,601 $ 4,571
10,000 $ 3,060 $ 5,131 $ 3,216 $ 5,392
25,000 $ 5,414 $ 6,313 $ 5,690 $ 6,635
27 S-1 Storage (Moderate Hazard) 500 $ 1,367 $ 2,475 $ 1,437 $ 2,601 TI 2,000 $ 1,733 $ 2,981 $ 1,822 $ 3,133
5,000 $ 2,175 $ 3,892 $ 2,286 $ 4,091
10,000 $ 2,670 $ 4,543 $ 2,806 $ 4,775
25,000 $ 4,386 $ 5,570 $ 4,609 $ 5,854
Resolution No. 2024-16
Exhibit D
Exhibit D
BUILDING PERMIT FEE SCHEDULE
City of Coronado CURRENT
FY 2023-24
Effective: 7/1/2023
ADJUSTED
FY 2024-25
Effective: 7/1/2024
Fee #
ICC (UBC)
Use Type Occupancy
Size Basis
(sq. ft.) Plan Check Inspection Plan Check Inspection
28 S-1 Storage (Moderate Hazard) 100 $ 510 $ 1,302 $ 536 $ 1,369 Shell 400 $ 757 $ 1,564 $ 795 $ 1,644
1,000 $ 1,238 $ 2,072 $ 1,301 $ 2,177
2,000 $ 1,615 $ 2,383 $ 1,697 $ 2,505
5,000 $ 1,878 $ 2,929 $ 1,973 $ 3,078
29 S-2 Parking Garage or Low Hazard Storage 1,000 $ 1,720 $ 4,140 $ 1,808 $ 4,351 Complete 4,000 $ 2,410 $ 5,051 $ 2,533 $ 5,309
10,000 $ 3,566 $ 6,584 $ 3,748 $ 6,919
20,000 $ 5,077 $ 7,913 $ 5,336 $ 8,317
50,000 $ 8,354 $ 9,812 $ 8,780 $ 10,313
30 R-1 Hotel, Motel 1,500 $ 2,317 $ 4,192 $ 2,435 $ 4,405 Complete 6,000 $ 3,476 $ 5,101 $ 3,653 $ 5,361
15,000 $ 5,402 $ 6,663 $ 5,677 $ 7,003
30,000 $ 7,847 $ 8,005 $ 8,248 $ 8,413
75,000 $ 13,480 $ 9,916 $ 14,168 $ 10,422
31 R-1 Hotel, Motel 250 $ 705 $ 1,329 $ 741 $ 1,397
TI 1,000 $ 1,004 $ 1,603 $ 1,056 $ 1,685
2,500 $ 1,251 $ 2,136 $ 1,315 $ 2,245
5,000 $ 1,615 $ 2,448 $ 1,697 $ 2,573
12,500 $ 2,774 $ 3,007 $ 2,915 $ 3,160
32 R-2 Multi-Family / Townhouse > 2 DU 750 $ 1,992 $ 3,697 $ 2,094 $ 3,886 Complete 3,000 $ 3,150 $ 4,504 $ 3,311 $ 4,734
7,500 $ 5,065 $ 5,896 $ 5,323 $ 6,197
15,000 $ 7,509 $ 7,040 $ 7,892 $ 7,399
37,500 $ 13,143 $ 8,707 $ 13,814 $ 9,151
33 R-2 Multi-Family / Townhouse > 2 DU 200 $ 952 $ 1,329 $ 1,001 $ 1,397 TI / Remodel 800 $ 1,343 $ 1,603 $ 1,411 $ 1,685
2,000 $ 1,758 $ 2,136 $ 1,848 $ 2,245
4,000 $ 2,227 $ 2,448 $ 2,340 $ 2,573
10,000 $ 3,515 $ 3,007 $ 3,694 $ 3,160
34 R-2 Multi-Family / Townhouse > 2 DU 200 $ 1,018 $ 1,733 $ 1,070 $ 1,822 Addition 800 $ 1,421 $ 2,123 $ 1,493 $ 2,231
2,000 $ 2,305 $ 2,801 $ 2,423 $ 2,944
4,000 $ 3,332 $ 3,360 $ 3,502 $ 3,531
10,000 $ 4,555 $ 4,178 $ 4,788 $ 4,391
35 R-3 New Single-Family Residence 1,000 $ 1,720 $ 2,696 $ 1,808 $ 2,833 2,000 $ 2,239 $ 3,020 $ 2,353 $ 3,175
4,000 $ 3,138 $ 3,372 $ 3,298 $ 3,544
7,000 $ 4,752 $ 4,634 $ 4,994 $ 4,870
10,000 $ 5,284 $ 5,582 $ 5,554 $ 5,867
36 R-3 Single-Family Residential 125 *$760.00 *$950.00 *$760.00 *$950.00 Addition 250 *$760.00 *$950.00 *$760.00 *$950.00
*Not subject to CPI adjustment 500 *$820.00 *$1,200.00 *$820.00 *$1,200.00 875 $ 1,758 $ 2,851 $ 1,848 $ 2,996
1,250 $ 2,006 $ 3,450 $ 2,108 $ 3,626
Resolution No. 2024-16
Exhibit D
Exhibit D
BUILDING PERMIT FEE SCHEDULE
City of Coronado CURRENT
FY 2023-24
Effective: 7/1/2023
ADJUSTED
FY 2024-25
Effective: 7/1/2024
Fee #
ICC (UBC)
Use Type Occupancy
Size Basis
(sq. ft.) Plan Check Inspection Plan Check Inspection
37 R-3 Single-Family Residential 125 $ 652 $ 1,081 $ 685 $ 1,137 Remodel 250 $ 730 $ 1,173 $ 767 $ 1,233
500 $ 976 $ 1,355 $ 1,026 $ 1,424
875 $ 1,120 $ 1,848 $ 1,178 $ 1,943
1,250 $ 1,238 $ 2,175 $ 1,301 $ 2,286
38 R-3.1 Licensed Residential Care < 7 occupants 1,000 $ 1,746 $ 2,618 $ 1,835 $ 2,751 Complete 2,000 $ 3,515 $ 2,915 $ 3,694 $ 3,064
4,000 $ 6,794 $ 3,270 $ 7,140 $ 3,436
7,000 $ 7,977 $ 4,478 $ 8,384 $ 4,707
10,000 $ 14,093 $ 5,414 $ 14,812 $ 5,690
39 R-3.1 Licensed Residential Care < 7 occupants 250 $ 1,081 $ 1,603 $ 1,137 $ 1,685 Alteration 500 $ 1,329 $ 1,770 $ 1,397 $ 1,860
1,000 $ 2,500 $ 2,006 $ 2,628 $ 2,108
1,750 $ 3,099 $ 2,774 $ 3,257 $ 2,915
2,500 $ 6,260 $ 3,306 $ 6,579 $ 3,475
40 R-4 Congregate Care 1,250 $ 2,618 $ 3,673 $ 2,751 $ 3,860 Complete 2,500 $ 3,228 $ 4,126 $ 3,393 $ 4,336
5,000 $ 4,349 $ 4,608 $ 4,571 $ 4,843
8,750 $ 5,805 $ 6,365 $ 6,101 $ 6,690
12,500 $ 7,040 $ 7,705 $ 7,399 $ 8,098
41 R-4 Congregate Care 500 $ 1,120 $ 1,681 $ 1,178 $ 1,767 Alteration 1,000 $ 1,302 $ 1,848 $ 1,369 $ 1,943
2,000 $ 2,057 $ 2,097 $ 2,162 $ 2,204
3,500 $ 2,879 $ 2,891 $ 3,026 $ 3,039
5,000 $ 4,491 $ 3,450 $ 4,720 $ 3,626
42 U Accessory Building (new) 60 $ 874 $ 847 $ 918 $ 890 Residential 240 $ 1,120 $ 1,030 $ 1,178 $ 1,083
600 $ 1,394 $ 1,251 $ 1,465 $ 1,315
1,200 $ 1,705 $ 1,627 $ 1,792 $ 1,710
3,000 $ 2,552 $ 2,031 $ 2,682 $ 2,135
43 U Accessory Building (new) 120 $ 1,120 $ 1,329 $ 1,178 $ 1,397 Commercial 480 $ 1,409 $ 1,615 $ 1,481 $ 1,697
1,200 $ 1,733 $ 2,045 $ 1,822 $ 2,149
2,400 $ 2,097 $ 2,500 $ 2,204 $ 2,628
6,000 $ 3,034 $ 3,099 $ 3,189 $ 3,257
44 U Accessory Building (alteration) 120 $ 602 $ 964 $ 632 $ 1,013 Commercial 480 $ 809 $ 1,160 $ 850 $ 1,219
1,200 $ 1,042 $ 1,523 $ 1,096 $ 1,601
2,400 $ 1,329 $ 1,812 $ 1,397 $ 1,904
6,000 $ 1,878 $ 2,239 $ 1,973 $ 2,353
45 U Residential Garage 40 $ 639 $ 757 $ 672 $ 795
160 $ 744 $ 886 $ 782 $ 931
400 $ 847 $ 1,096 $ 890 $ 1,152
800 $ 991 $ 1,263 $ 1,042 $ 1,328
2,000 $ 1,069 $ 1,523 $ 1,124 $ 1,601
Resolution No. 2024-16
Exhibit D
Exhibit D
BUILDING PERMIT FEE SCHEDULE
City of Coronado CURRENT
FY 2023-24
Effective: 7/1/2023
ADJUSTED
FY 2024-25
Effective: 7/1/2024
Fee #
ICC (UBC)
Use Type Occupancy
Size Basis
(sq. ft.) Plan Check Inspection Plan Check Inspection
46 U-1 Carport 40 $ 587 $ 705 $ 617 $ 741
160 $ 678 $ 809 $ 713 $ 850
400 $ 757 $ 991 $ 795 $ 1,042
800 $ 847 $ 1,173 $ 890 $ 1,233
2,000 $ 1,042 $ 1,409 $ 1,096 $ 1,481
47 U-1 Residential Garage Conversion 40 $ 757 $ 744 $ 795 $ 782 160 $ 886 $ 901 $ 931 $ 947
400 $ 1,030 $ 1,160 $ 1,083 $ 1,219
800 $ 1,200 $ 1,355 $ 1,261 $ 1,424
2,000 $ 1,511 $ 1,668 $ 1,588 $ 1,753
48 FO Foundation Only (all occupancies) 350 $ 420 $ 744 $ 441 $ 782 1,400 $ 471 $ 901 $ 495 $ 947
3,500 $ 510 $ 1,160 $ 536 $ 1,219
7,000 $ 536 $ 1,355 $ 563 $ 1,424
17,500 $ 561 $ 1,668 $ 590 $ 1,753
49 BO Basement Only (all occupancies) 200 $ 665 $ 744 $ 699 $ 782 800 $ 860 $ 901 $ 904 $ 947
2,000 $ 1,120 $ 1,160 $ 1,178 $ 1,219
4,000 $ 1,409 $ 1,355 $ 1,481 $ 1,424
10,000 $ 2,072 $ 1,668 $ 2,177 $ 1,753
Resolution No. 2024-16
Exhibit D
NOTE: Fees with * are not subject to CPI adjustment. Not all projects will be required to pay a plan Exhibit D
COMMUNITY DEVELOPMENT - BUILDING - MISCELLANEOUS ITEM FEE SCHEDULE City of Coronado
CURRENT ADJUSTED
FY 2023-24 FY 2024-25
Effective: 7/1/2023 Effective: 7/1/2024
FEE # FEE TITLE Plan Check Inspection Plan Check Inspection
UNIT FEES
1 Boat / Car Lift (plus actual plan check costs from outside contractor)
$ 406 $ 678 $ 427 $ 713
2 Vehicle Turntable (plus actual plan check costs from
outside contractor)
$ 250 $ 678 $ 263 $ 713
3 Antennas - (each) $ 406 $ 678 $ 427 $ 713
4 Reserved
5 Balcony - First 100 sq. ft. $ 354 $ 614 $ 372 $ 645
6 Each additional 50 sq. ft. $ 53 $ 65 $ 56 $ 69
7 Cellular/Mobile Phone Tower - New - Each (plus actual plan check costs from outside contractor)
$ 940 $ 639 $ 988 $ 672
8 Cellular/Mobile Phone Tower - Addition/ Alteration -
Each (plus actual plan check costs from outside
contractor)
$ 587 $ 602 $ 617 $ 632
9 Certificate of Occupancy $ 94 $0 $ 98 $0
10 Change of Occupancy (No T.I. w/ plan check & Inspection) $0 $ 288 $0 $ 302 11 Temporary Occupancy Permit $ 94 $ 327 $ 98 $ 343
12 Change of Contractor Fee $ 65 $ 80 $ 69 $ 84
13 Deck - First 150 sq. ft. $ 354 $ 483 $ 372 $ 508
14 Each additional 50 sq. ft. $ 53 $ 65 $ 56 $ 69
15 Demolition (entire building) $ 236 $ 301 $ 248 $ 316 16 Partial / Exploratory Demolition $ 236 $ 262 $ 248 $ 275 17 Fence (wood, chain link, wrought iron, vinyl)-First 100 lf *$45 *$100 *$45 *$100 18 Each additional 50 lf *$0 *$0 *$0 *$0
19 Flag pole >6 feet - Each $ 359 $ 257 $ 377 $ 270
FREESTANDING WALL (MASONRY)
20 Up to 6' - First 100 lf *$45 *$100 *$45 *$100
21 Each additional 50 lf $ 53 $ 78 $ 56 $ 82
22 Greater than 6' (engineered) - First 100 lf $ 369 $ 421 $ 388 $ 443 23 Each additional 50 lf $ 53 $ 78 $ 56 $ 82
24 Fireplace/ BBQ - Masonry - Each *$45 *$100 *$45 *$100 25 Fire Plan Check Processing (for outside contractor) $ 155 $0 $ 162 $0 Resolution No. 2024-16
Exhibit D
NOTE: Fees with * are not subject to CPI adjustment. Not all projects will be required to pay a plan Exhibit D
COMMUNITY DEVELOPMENT - BUILDING - MISCELLANEOUS ITEM FEE SCHEDULE City of Coronado
CURRENT ADJUSTED
FY 2023-24 FY 2024-25
Effective: 7/1/2023 Effective: 7/1/2024
FEE # FEE TITLE Plan Check Inspection Plan Check Inspection 26 Foundation and/or slab Repair - First 100 sq. ft. $ 206 $ 307 $ 216 $ 323 27 Each additional 100 sq. ft. $ 29 $ 80 $ 30 $ 84
28 Shoring Permit - First 100 lf (plus actual plan check costs from outside contractor)
$ 206 $ 422 $ 216 $ 443
29 Each additional 50 lf $ 29 $ 80 $ 30 $ 84
30 deleted
31 deleted
32 Light Standards - Each $ 319 $ 275 $ 335 $ 289
33 deleted
34 deleted
35 Misc. Structure - Storage Shed - First 150 sq. ft. $ 422 $ 294 $ 443 $ 309 36 Each additional 100 sq. ft. $ 29 $ 80 $ 30 $ 84
37 Partition-commercial - First 100 lf $ 345 $ 294 $ 363 $ 309 38 Each additional 50 lf $ 29 $ 80 $ 30 $ 84
49 Patio Cover - First 100 sq. ft. $ 345 $ 294 $ 363 $ 309 50 Each additional 50 sq. ft. $ 29 $ 65 $ 30 $ 69
51 Patio Room - First 100 sq. ft. $ 319 $ 410 $ 335 $ 431 52 Each additional 50 sq. ft. $ 29 $ 94 $ 30 $ 98
53 Awnings & Canopies - First 100 sq. ft. $ 319 $ 319 $ 335 $ 335 54 Each additional 50 sq. ft. $ 29 $ 80 $ 30 $ 84
55 Pile Foundation - Each (plus actual plan check costs from outside contractor)
$ 168 $ 319 $ 176 $ 335
56 Re-roofing - Residential - First 10 Squares $ 155 $ 256 $ 162 $ 269 57 Each additional 10 squares $ 17 $ 80 $ 17 $ 84
58 Re-roofing - Commercial - First 10 Squares $ 155 $ 244 $ 162 $ 256 59 Each additional 10 squares $ 17 $ 80 $ 17 $ 84
60 Roof structure replacement - Per 100 sq. ft. (plus actual plan check costs from outside contractor)
$ 345 $ 345 $ 363 $ 363
Resolution No. 2024-16
Exhibit D
NOTE: Fees with * are not subject to CPI adjustment. Not all projects will be required to pay a plan Exhibit D
COMMUNITY DEVELOPMENT - BUILDING - MISCELLANEOUS ITEM FEE SCHEDULE City of Coronado
CURRENT ADJUSTED
FY 2023-24 FY 2024-25
Effective: 7/1/2023 Effective: 7/1/2024
FEE # FEE TITLE Plan Check Inspection Plan Check Inspection 61 Retaining Wall - City Standard - First 100 lf $ 294 $ 294 $ 309 $ 309 62 Each additional 50 lf $ 29 $ 94 $ 30 $ 98
63 Retaining Wall w/Calcs - First 100 lf (plus actual plan check costs from outside contractor)
$ 294 $ 294 $ 309 $ 309
64 Each additional 50 lf $ 29 $ 94 $ 30 $ 98
65 Sauna - Each $ 281 $ 256 $ 295 $ 269
66 Siding / stucco / veneer - First 100 sq. ft. $ 104 $ 244 $ 110 $ 256 67 Each additional 100 sq. ft. $ 17 $ 80 $ 17 $ 84
68 1-2 Unit Residential Siding/Stucco/Venner (Flat Fee) $ 96 $ 294 $ 96 $ 294 SIGNS
69 Pole - Each (plus actual plan check costs from outside contractor)
$ 281 $ 256 $ 295 $ 269
70 Monument - Each (plus actual plan check costs from
outside contractor)
$ 281 $ 256 $ 295 $ 269
71 Wall / Roof - Each (plus actual plan check costs from outside contractor)
$ 281 $ 256 $ 295 $ 269
SITE INSPECTION
72 Skylight w/o structural modification - Each $ 128 $ 307 $ 135 $ 323 73 Skylight w/structural modifications - Each (plus actual plan check costs from outside contractor)
$ 168 $ 307 $ 176 $ 323
Resolution No. 2024-16
Exhibit D
NOTE: Fees with * are not subject to CPI adjustment. Not all projects will be required to pay a plan Exhibit D
COMMUNITY DEVELOPMENT - BUILDING - MISCELLANEOUS ITEM FEE SCHEDULE City of Coronado
CURRENT ADJUSTED
FY 2023-24 FY 2024-25
Effective: 7/1/2023 Effective: 7/1/2024
FEE # FEE TITLE Plan Check Inspection Plan Check Inspection SOLAR
74 Solar Water Heating System - roof mounted - Each
System (plus actual plan check costs from outside
contractor)
$ 345 $ 180 $ 363 $ 189
75 Solar Water Heating System - ground mounted - Each
System (plus actual plan check costs from outside
contractor)
$ 345 $ 180 $ 363 $ 189
76 Solar Photovoltaic System - roof mounted - Per
Residential System (plus actual plan check costs from
outside contractor) up to $500
$ 357 $ 180 $ 375 $ 189
77 Solar PV - Commercial System - First 300 sq. ft. (plus actual plan check costs from outside contractor) up to
$1000
$ 357 $ 200 $ 375 $ 210
78 Each additional 150 sq. ft. $ 53 $ 53 $ 56 $ 56
79 Suspended Ceiling - First 100 sq. ft. $ 141 $ 319 $ 149 $ 335 80 Each additional 100 sq. ft. $ 17 $ 94 $ 17 $ 98
SWIMMING POOL / SPA - PRIVATE
81 Vinyl-lined / fiberglass - up to 800 sq. ft. $ 345 $ 382 $ 363 $ 402 82 Gunite/Shotcrete - up to 800 sq. ft. $ 369 $ 498 $ 388 $ 523 83 Each additional 100 sq. ft. $ 28 $ 141 $ 30 $ 149
84 Swimming Pool/Spa remodel - up to 800 sq. ft. $ 319 $ 333 $ 335 $ 350 85 Each additional 100 sq. ft. $ 28 $ 91 $ 30 $ 96
86 Trash Enclosure including roof - First 100 sq. ft. $ 281 $ 345 $ 295 $ 363 87 Each additional 100 sq. ft. $ 29 $ 94 $ 30 $ 98
88 Window/Door replacement w/ structural modification - First 5
$ 141 $ 357 $ 149 $ 375
89 Each additional 100 sq. ft. $ 17 $ 107 $ 17 $ 112
90 Manufactured / Pre-fab Buildings (foundation and utility connections)
$ 307 $ 624 $ 323 $ 656
91 Construction Trailer (anchored) $ 307 $ 333 $ 323 $ 350 Resolution No. 2024-16
Exhibit D
Exhibit D
COMMUNITY DEVELOPMENT - MECHANICAL, PLUMBING & ELECTRICAL FEE SCHEDULE City of Coronado
NOTE: Fees with * are not subject to CPI adjustment.
Not all projects will be required to pay a plan check fee. Noted fees typically do not require a plan check fee.
If plan check is required, applicants will be charged hourly rate of $115 for actual time spent checking plan.
CURRENT ADJUSTED
FY 2023-24 FY 2024-25
Effective: 7/1/2023 Effective: 7/1/2024
FEE # FEE TITLE Plan Check Inspection Plan Check Inspection Mechanical Permit Fees
1 Air Compressor, Pipe and Tank $ 145 $ 237 $ 153 $ 249 2 AHU (cooling & heating) $ 145 $ 237 $ 153 $ 249
3 Boilers $ 145 $ 237 $ 153 $ 249
4 Chillers $ 145 $ 237 $ 153 $ 249
5 Cooling Tower $ 145 $ 237 $ 153 $ 249
6 Duct only - up to 500 sf of area served $ 145 $ 237 $ 153 $ 249 7 - each additional 100 sf $ 145 $ 237 $ 153 $ 249
8 Exhaust System (hood and vent) non-residential $ 145 $ 237 $ 153 $ 249 9 Exhaust system (kitchen, bath, dryer) $ 145 $ 237 $ 153 $ 249 10 Fireplace & flue (manufactured) $ 145 $ 237 $ 153 $ 249 11 Heating appliance (floor, wall, suspended, pool) See Note *$80 See Note *$80 12 Miscellaneous equipment (not classified) See Note *$20 See Note *$20 13 Process piping - each outlet $ 142 $ 232 $ 150 $ 244 14 Refrigeration System (cooler/freezer) See Note *$20 See Note *$20 15 Mechanical Inspection (per hour) - 1/2 hour minimum $0 $ 151 $0 $ 158 16 Mechanical Plan Review (per hour) - 1/2 hour minimum $ 158 $0 $ 166 $0 Plumbing Permit Fees
17 Backflow device (water) each $ 145 $ 237 $ 153 $ 249 18 Backwater valve (sewer) each $ 288 $ 237 $ 303 $ 249 19 Bar sink See Note *$60 See Note *$60
20 Bidet See Note *$60 See Note *$60
21 Bathtub See Note *$60 See Note *$60
22 Clothes washer See Note *$60 See Note *$60
23 Dishwasher See Note *$60 See Note *$60
24 Drinking fountain See Note *$60 See Note *$60
25 Floor drain See Note *$60 See Note *$60
26 Floor sink See Note *$60 See Note *$60
27 Garbage disposal See Note *$50 See Note *$50
28 Gas piping - each outlet $ 145 $ 237 $ 153 $ 249
29 Gray water system (residential) $ 145 $ 237 $ 153 $ 249 30 Interceptor (FOG & sand) $ 145 $ 237 $ 153 $ 249
31 Lavatory See Note *$60 See Note *$60
32 Laundry sink See Note *$60 See Note *$60
33 Lawn sprinkler & Backflow device $ 145 $ 237 $ 153 $ 249 34 Medical gas system - each outlet $ 145 $ 237 $ 153 $ 249 35 Medical vacuum system $ 145 $ 237 $ 153 $ 249
36 Miscellaneous plumbing $ 145 $ 237 $ 153 $ 249
37 Sewer lateral - each 100 lineal ft. $ 145 $ 237 $ 153 $ 249 38 Sink (other than bar, floor or laundry) See Note *$60 See Note *$60 39 Solar potable water heater $ 132 $ 132 $ 139 $ 139
Resolution No. 2024-16
Exhibit D
Exhibit D
COMMUNITY DEVELOPMENT - MECHANICAL, PLUMBING & ELECTRICAL FEE SCHEDULE City of Coronado
NOTE: Fees with * are not subject to CPI adjustment.
Not all projects will be required to pay a plan check fee. Noted fees typically do not require a plan check fee.
If plan check is required, applicants will be charged hourly rate of $115 for actual time spent checking plan.
CURRENT ADJUSTED
FY 2023-24 FY 2024-25
Effective: 7/1/2023 Effective: 7/1/2024
FEE # FEE TITLE Plan Check Inspection Plan Check Inspection 40 Solar pool/spa water heater $ 132 $ 132 $ 139 $ 139
41 Shower pan or Mop pan See Note *$60 See Note *$60
42 Swimming pool piping, gas & heater $ 145 $ 237 $ 153 $ 249 43 Rainwater piping system (per drain) $ 145 $ 237 $ 153 $ 249 44 Urinal See Note *$60 See Note *$60
45 Water heater and vent $0 $ 132 $0 $ 139
46 Water piping system $ 145 $ 237 $ 153 $ 249
47 Water closet (toilet) See Note *$60 See Note *$60
48 Water softener See Note *$60 See Note *$60
49 Plumbing Inspection (per hour) - 1/2 hour minimum $0 $ 159 $0 $ 167 50 Plumbing Plan Review (per hour) - 1/2 hour minimum $ 159 $0 $ 167 $0 Electrical Permit Fees
51 Air Conditioner - Commercial (per unit) $ 145 $ 237 $ 153 $ 249 52 Air Conditioner - Residential (per unit) $ 145 $ 237 $ 153 $ 249 53 Miscellaneous equipment or appliance connection - Commercial (includes outlets and wiring) $ 145 $ 237 $ 153 $ 249 54 Miscellaneous equipment or appliance connection -
Residential (includes outlets and wiring)
See Note *$60 See Note *$60
55 Sub-Panel (up to 200 amps) $ 145 $ 237 $ 153 $ 249
56 Sub-Panel (201 1000 amps) $ 145 $ 237 $ 153 $ 249
57 Sub-Panel (over 1000 amps) $ 145 $ 237 $ 153 $ 249
58 Idle Meter Reactivation $ 145 $ 237 $ 153 $ 249
59 Temporary Power Pole / TSPB $ 145 $ 237 $ 153 $ 249
60 Miscellaneous Electrical Work - Commercial $ 145 $ 237 $ 153 $ 249 61 Miscellaneous Electrical Work - Residential $ 145 $ 237 $ 153 $ 249 62 A, E, H, I Occupancy Wiring (per 500 sf) $ 145 $ 237 $ 153 $ 249 63 B, M, F-1, F-2, S Occupancy Wiring (per 500 sf) $ 145 $ 237 $ 153 $ 249 64 U Occupancy Wiring (per 100 sf) $ 145 $ 237 $ 153 $ 249 65 R1, R3 Occupancy Wiring (per 100 sf) $ 145 $ 237 $ 153 $ 249 66 Service (up to 200 amps) $ 145 $ 237 $ 153 $ 249
67 Service (201 to 1000 amps) $ 145 $ 237 $ 153 $ 249
68 Service (over 1000 amps) $ 145 $ 237 $ 153 $ 249
69 Electrical Inspection (per hour) - 1/2 hour minimum $0 $ 159 $0 $ 167 70 Electrical Plan Review (per hour) - 1/2 hour minimum $ 154 $0 $ 162 $0 Resolution No. 2024-16
Exhibit D
Exhibit D
PLANNING FEE SCHEDULE - PART I (DEPOSITS)
City of Coronado
NOTE: Fees with * are not subject to CPI adjustment
Current
Deposit
Requirement
Current
Deposit
Requirement
FEE # FEE TITLE FY 2023-24 FY 2024-25
California Environmental Quality Act
1 Negative Declaration with Mitigation Measures
(Contracted service or Hourly w/ Deposit)
*$3,000 *$3,000
2 Environmental Impact Report
(Contracted Service or Actual Staff Hours; with Deposit) *$10,000 *$10,000
3 EIR Addendum / Supplements / Recertification
(Contracted Service or Actual Staff Hours; with Deposit) *$10,000 *$10,000
4 Environmental Mitigation Monitoring
(Contracted Service or Actual Staff Hours; with Deposit) *$3,000 *$3,000
5 Technical Review of Consultant Reports (Deposit) *$5,000 *$5,000 Consultant-Provided Landscape Review Reports and Services 6 City Administration and Processing *$620 *$620
7 Consultant Cost Pass-through (Actual cost paid by applicant) $0 $0 General Plan / Zoning
8 General Plan Amendment (Actual Staff Hours; with Deposit) *$5,000 *$5,000 9 Zoning Map Amendment (Actual Staff Hours; with Deposit) *$5,000 *$5,000 10 Zoning Ordinance Amendment (Actual Staff Hours; with Deposit) *$5,000 *$5,000 11 Development Agreement *$5,000 *$5,000
Resolution No. 2024-16
Exhibit D
Exhibit D
PLANNING FEE SCHEDULE - PART II (FEES)
City of Coronado
NOTE: Fees with * are not subject to CPI adjustment
CURRENT ADJUSTED
FY 2023-24 FY 2024-25
FEE # FEE TITLE Effective 7/1/23 Effective 7/1/24
California Environmental Quality Act
1 Categorical Exemption $ 195 $ 204
2 Initial Study $ 3,539 $ 3,719
3 Negative Declaration $ 1,914 $ 2,011
California Coastal Act Related
4 Local Coastal Program Amendment
(Actual Staff Hours; with Deposit)
*$14,657 *$14,657
5 Coastal Permit $ 3,970 $ 4,172
6 Coastal Permit w/ other Permits $ 1,365 $ 1,434
7 Coastal Permit Amendment $ 3,305 $ 3,473
8 Emergency Coastal Permit Waiver $ 962 $ 1,011
9 Coastal Permit Exemption $ 808 $ 849
10 Coastal Permit Appeal $ 651 $ 684
10a Low Cost Visitor Accomodation In-Lieu Fee (per room) $30,000* $30,000* General Plan / Zoning
11 Reserved
12 Planning Commission Variance $ 3,916 $ 4,115
13 Zoning Administrative Variance $ 2,913 $ 3,061
14 Determination of Use $ 1,562 $ 1,641
15 Determination of Development $ 1,431 $ 1,503
16 Planning Commission Interpretation $ 1,562 $ 1,641
17 Major Special Use Permit $ 6,064 $ 6,373
18 Major Special Use Permit Amendment $ 4,957 $ 5,209
19 Minor Special Use Permit $ 3,773 $ 3,965
20 Minor Special Use Permit Amendment $ 3,773 $ 3,965
21 Parking Plan $ 5,177 $ 5,441
22 Parking Plan with Other Permit $ 2,589 $ 2,721
23 Tentative Parcel Map Planning Fees $ 5,596 $ 5,881
23a Tentative Parcel Map Engineering Fees $3,000* $3,000* 24 Final Parcel Map $ 1,914 $ 2,011
25 Parcel Map Amendments $ 4,841 $ 5,087
26 Parcel Map Extension $ 754 $ 792
27 Major Subdivision Tentative Map Planning Fees $ 5,712 $ 6,003 27a Major Subdivision Tentative Map Engineering Fees $3,000* $3,000* 28 Major Subdivision Final Map $ 2,238 $ 2,352
29 Subdivision Map Amendment $ 5,177 $ 5,441
30 Subdivision Map Extension $ 754 $ 792
Resolution No. 2024-16
Exhibit D
Exhibit D
PLANNING FEE SCHEDULE - PART II (FEES)
City of Coronado
NOTE: Fees with * are not subject to CPI adjustment
CURRENT ADJUSTED
FY 2023-24 FY 2024-25
FEE # FEE TITLE Effective 7/1/23 Effective 7/1/24
31 Lot Line/Boundary Line Adjustment $ 833 $ 875
32 Lot Consolidation $ 833 $ 875
Administrative Permits
33 Large Family Daycare $ 613 $ 644
34 Home Occupation Permit $ 39 $ 40
35 Application for Business Occupancy $ 261 $ 274
36 Noise Permit $ 92 $ 96
37 Temporary/Movable Sign Permit $ 92 $ 96
38 Wireless Administrative Special Use Permit $ 2,716 $ 2,854 39 SB9 Residential Development $ 525 $ 551
40 SB9 Urban Lot Split $ 840 $ 882
Design Review
41 New Commercial & Multi-Family Construction $ 1,040 $ 1,093 42 Major Design Review Application / Amendment $ 781 $ 820 43 Minor Design Review Application / Amendment $ 261 $ 274 Historic Preservation
44 Determination of Historic Significance $ 1,010 $ 1,061 45 Historic Resource Alteration (HAP) Permit $ 130 $ 136 46 Historic Resource Alteration Permit with Demolition $ 3,720 $ 3,909 47 Historic Resource Alteration Permit with Code Exceptions to City Council
$ 130 $ 136
48 Historic Resource Preservation (Mills Act) Agreement $ 111 $ 116 Other Fees
49 Preliminary Proposal Review $ 690 $ 725
50 Newspaper Public Notice / Re-notice (for notices not already included in another fee)
$ 92 $ 96
51 Large Public Notice Distribution >50 $ 390 $ 409
52 Applicant Appeal of Decision $ 651 $ 684
53 Appeal by Other Than Applicant $ 651 $ 684
54 Business Proposal Review $ 376 $ 395
55 Zoning Letter $ 248 $ 260
55a Major Zoning Plan Check (for checks not already included in another fee)
$ 548 $ 575
56 Minor Zoning Plan Check (for checks not already included in another fee)
$ 92 $ 96
57 Service Request / Research Fee (Actual Staff Hours; with Deposit)
$ 429 $ 450
Resolution No. 2024-16
Exhibit D
Exhibit D
PLANNING FEE SCHEDULE - PART II (FEES)
City of Coronado
NOTE: Fees with * are not subject to CPI adjustment
CURRENT ADJUSTED
FY 2023-24 FY 2024-25
FEE # FEE TITLE Effective 7/1/23 Effective 7/1/24
58 Discretionary Compliance Review (Added to Building fees that already include this cost)
$ 767 $ 806
59 Reasonable Accommodation Request $ 429 $ 450
60 Administrative Special Use Permit Application $ 2,716 $ 2,854 61 Sidewalk Vending Application Permit Fee $ 228 $ 239
62 Sidewalk Vending Application Renewal Fee $ 113 $ 118 Resolution No. 2024-16
Exhibit D
Exhibit D
ENGINEERING & PROJECT DEVELOPMENT FEE SCHEDULE
City of Coronado
CURRENT ADJUSTED
FY 2023-24 FY 2024-25
FEE # FEE TITLE Effective 7/1/23 Effective 7/1/24
Improvements in the Right-of-Way
Plan Check (based on Engineer's estimate of construction cost):
1 Up to $2,000 $ 184 $ 193
2 $2,001 - $10,000 $ 223 $ 234
3 $10,001 to $50,000 $ 262 $ 275
4 $50,001 to $100,000 Valuation $ 288 $ 302
5 $100,001 to $250,000 Valuation $ 288 $ 302
6 Over $250,000 - each additional $100,000 $ 158 $ 166
7 Recheck (each) $ 80 $ 84
Inspection (based on Engineer's estimate of construction cost):
8 Up to $2,000 $ 94 $ 98
9 $2,001 - $10,000 $ 131 $ 138
10 $10,001 to $50,000 $ 172 $ 180
11 $50,001 to $100,000 Valuation $ 223 $ 234
12 $100,001 to $250,000 Valuation $ 301 $ 316
13 Over $250,000 - each additional $100,000 $ 196 $ 206 14 Re-inspection (each) $ 65 $ 69
Encroachment Permits
15 Residential Hardscape *$400 *$400
15 a Residential Water Conservation Projects $0 $0
16 Residential Structure *$400 *$400
17 Outdoor Dining *$350 *$350
18 Commercial Hardscape *$400 *$400
19 Commercial Structures - Minor *$400 *$400
Dock Permits(in addition to consultant costs)
20 Structural Repair Permit (each) $ 315 $ 331
New Construction or Replacement Permits
Plan Check:
21 Contract Processing and Administration $ 315 $ 331
22 Re-Check - Contract Processing and Administration (each) Inspection:
23 Standard Dock (up to 50 lf) $ 120 $ 127
24 Non-standard or Custom Dock (up to 50 lf) $ 2,057 $ 2,162 25 Each additional 50 lf, or portion thereof $ 65 $ 69
26 Re-inspection (each) $ 107 $ 112
NOTE: Fees with * are not subject to CPI adjustment
Resolution No. 2024-16
Exhibit D
Exhibit D
ENGINEERING & PROJECT DEVELOPMENT FEE SCHEDULE
City of Coronado
NOTE: Fees with * are not subject to CPI adjustment
CURRENT ADJUSTED
FY 2023-24 FY 2024-25
FEE # FEE TITLE Effective 7/1/23 Effective 7/1/24
Review of Required Studies (in addition to consultant costs) 27 Traffic Study - Review of Private Project Study *$1,000 Deposit *$1,000 Deposit 28 Seismic Review - Review of Geologist Study or Peer Review Analysis *$5,000 Deposit *$5,000 Deposit De-Watering Permit
29 Project Permit (City Administration and Monitoring) $ 354 $ 372 Other Permits
30 Abandonments $ 757 $ 795
31 Grading Plan Check $ 420 $ 441
Parcel/Tract Maps(in addition to consultant costs)
32 Contract Processing and Administration $ 236 $ 248
33 Re-Check - Contract Processing and Administration (each) $ 131 $ 138 Other Inspection Fees
34 Inspections outside of normal business hours - Per Hour (two hour minimum)
$ 119 $ 125
35 Re-inspection fees assessed under provisions of Building Code Section 108.8 - Per Hour
$ 119 $ 125
36 Inspections for which no fee is specifically indicated - Per Hour (minimum charge one-half hour)
$ 119 $ 125
37 Additional plan review required by changes, additions or revisions to plans - Per Hour
$ 119 $ 125
Resolution No. 2024-16
Exhibit D
Exhibit D
PUBLIC SERVICES USER FEE SCHEDULE
City of Coronado
CURRENT ADJUSTED
FY 2023-24 FY 2024-25
FEE # FEE TITLE Effective 7/1/23 Effective 7/1/24
(Building-related beyond normal review)
Plan Check plus Inspection:
1 Storm Water Plan Check: new construction Fees 1 and 2 for all standard projects
handled by $562 flat
rate.
Fees 1 and 2 for all
standard projects
handled by $ 591 flat
rate.
2 Storm Water Inspection: new construction Exempt projects handled by a $40 flat
rate.
Exempt projects
handled by a $40 flat
rate.
3 Storm Water Plan Check, triggered by projects that
require a Stormwater Pollution Prevention Plan -
SWPPP (1 acre or more) or
Standard Urban Stormwater Mitigation Plan - SUSMP
(10 units or more, High Threat Activity)
Fees for 3, 4, and 5
handled by $5,000
deposit.
Fees for 3, 4, and 5
handled by $5,000
deposit.
4 Outside Consultant Technical Plan Review pass
through cost - direct charge to applicant
5 Inspection: Required forSWPPP and SUSMP during
Project development
Inspection Only:
6 SUSMP Annual Inspection (post-construction) - Annual
Fee
$ 359 $ 377
7 Compliance/Follow-Up $ 75 $ 79
Resolution No. 2024-16
Exhibit D
Exhibit D
FIRE SERVICES FEE SCHEDULE
City of Coronado
CURRENT ADJUSTED
FY 2023-24 FY 2024-25
FEE # FEE TITLE Effective 7/1/23 Effective 7/1/24
New Construction Fees (all inspections excluding sprinkler) 1 Commercial Inspection:
2 0 - 5,000 sq. ft. $ 796 $ 836
3 5,001 - 25,000 sq. ft. $ 847 $ 890
4 25,001 - 100,000 sq. ft. $ 913 $ 959
5 each additional 25,000 sq. ft. (or portion thereof) $ 250 $ 263 6 Re-inspection $ 420 $ 441
7 Residential Inspection:
8 0 - 5,000 sq. ft. $ 796 $ 836
9 5,001 - 25,000 sq. ft. $ 913 $ 959
10 25,001 - 100,000 sq. ft. $ 1,018 $ 1,070
11 each additional 25,000 sq. ft. (or portion thereof) $ 211 $ 222 12 Re-inspection $ 471 $ 495
Sprinkler Inspection
13 Commercial:
14 0 - 5,000 sq. ft. $ 769 $ 808
15 5,001 - 25,000 sq. ft. $ 796 $ 836
16 25,001 - 100,000 sq. ft. $ 913 $ 959
17 each additional 25,000 sq. ft. (or portion thereof) $ 211 $ 222 18 Re-inspection $ 406 $ 427
19 Single Family:
20 0 - 5,000 sq. ft. $ 627 $ 659
21 Greater than 5,000 sq. ft. $ 652 $ 685
22 Re-inspection $ 444 $ 467
23 Multi-Family:
24 0 - 5,000 sq. ft. $ 796 $ 836
25 5,001 - 25,000 sq. ft. $ 835 $ 877
26 25,001 - 100,000 sq. ft. $ 940 $ 988
27 each additional 25,000 sq. ft. (or portion thereof) $ 211 $ 222 28 Re-inspection $ 406 $ 427
29 5-year Certification Non-Compliance Correction Fee $ 692 $ 727 Resolution No. 2024-16
Exhibit D
Exhibit D
FIRE SERVICES FEE SCHEDULE
City of Coronado
CURRENT ADJUSTED
FY 2023-24 FY 2024-25
FEE # FEE TITLE Effective 7/1/23 Effective 7/1/24
Other Fire Service and Inspection Fees
30 Chemical Fire Extinguishing Systems $ 874 $ 918
31 Fire Alarm Company Permits: Monitoring Companies - Annual Fee (new and renewal) $ 1,108 $ 1,165 32 Fire Alarm Plan Check Modifications $ 1,042 $ 1,096
33 Wet Chemical / Kitchen Hood System Installation/Upgrade - Each $ 1,120 $ 1,178 34 Underground Tank Removal or Installation - Per Tank $ 835 $ 877 35 California Fire Code Systems and Features - All Other (each) $ 1,120 $ 1,178 Resolution No. 2024-16
Exhibit D
Exhibit D
FIRE SERVICES FEE SCHEDULE
City of Coronado
CURRENT ADJUSTED
Size Basis FY 2023-24 FY 2024-25
FEE # OCCUPANCY (sq. ft.) Effective 7/1/23 Effective 7/1/24 1 Commercial Building with Interior 5,000 $ 1,433 $ 1,506 10,000 $ 1,524 $ 1,601
25,000 $ 1,720 $ 1,808
50,000 $ 1,878 $ 1,974
100,000 $ 2,032 $ 2,135
2 Commercial without Interior (Shell) 5,000 $ 964 $ 1,013 10,000 $ 1,030 $ 1,083
25,000 $ 1,147 $ 1,206
50,000 $ 1,251 $ 1,314
100,000 $ 1,343 $ 1,411
3 Restaurant 2,000 $ 1,276 $ 1,342
4,000 $ 1,355 $ 1,424
10,000 $ 1,524 $ 1,601
20,000 $ 1,668 $ 1,753
40,000 $ 1,799 $ 1,891
4 Medical/Dental/Surgical Office 5,000 $ 1,589 $ 1,670
10,000 $ 1,693 $ 1,780
25,000 $ 1,914 $ 2,011
50,000 $ 2,084 $ 2,190
100,000 $ 2,252 $ 2,367
5 Mid Rise 10,000 $ 2,383 $ 2,504
20,000 $ 2,540 $ 2,669
50,000 $ 2,879 $ 3,026
100,000 $ 3,150 $ 3,311
200,000 $ 3,410 $ 3,584
6 High Rise 14,000 $ 3,164 $ 3,325
28,000 $ 3,384 $ 3,557
70,000 $ 3,839 $ 4,035
140,000 $ 4,205 $ 4,419
280,000 $ 4,569 $ 4,802
7 Hotel/Motel/Multiform 5,000 $ 1,433 $ 1,506
10,000 $ 1,524 $ 1,601
25,000 $ 1,720 $ 1,808
50,000 $ 1,878 $ 1,974
100,000 $ 2,032 $ 2,135
Resolution No. 2024-16
Exhibit D
Exhibit D
FIRE SERVICES FEE SCHEDULE
City of Coronado
CURRENT ADJUSTED
Size Basis FY 2023-24 FY 2024-25
FEE # OCCUPANCY (sq. ft.) Effective 7/1/23 Effective 7/1/24 8 Parking Structure 5,000 $ 964 $ 1,013
10,000 $ 1,030 $ 1,083
25,000 $ 1,147 $ 1,206
50,000 $ 1,251 $ 1,314
100,000 $ 1,343 $ 1,411
9 Hazardous Occupancy 5,000 $ 1,589 $ 1,670
10,000 $ 1,693 $ 1,780
25,000 $ 1,914 $ 2,011
50,000 $ 2,084 $ 2,190
100,000 $ 2,252 $ 2,367
10 TI - Restaurant 400 $ 730 $ 767
800 $ 768 $ 808
2,000 $ 861 $ 904
4,000 $ 925 $ 972
8,000 $ 1,004 $ 1,056
11 TI - General (All Other) 400 $ 575 $ 604
800 $ 602 $ 633
2,000 $ 665 $ 699
4,000 $ 718 $ 754
8,000 $ 768 $ 808
12 Hazardous 400 $ 730 $ 767
800 $ 768 $ 808
2,000 $ 861 $ 904
4,000 $ 925 $ 972
8,000 $ 1,004 $ 1,056
13 Medical 400 $ 730 $ 767
800 $ 768 $ 808
2,000 $ 861 $ 904
4,000 $ 925 $ 972
8,000 $ 1,004 $ 1,056
14 Single Family 1 or 2 Family 1,000 $ 575 $ 604
(custom or model) 2,000 $ 575 $ 604
3,000 $ 627 $ 659
5,000 $ 665 $ 699
7,500 $ 913 $ 960
Resolution No. 2024-16
Exhibit D
Exhibit D
FIRE SERVICES FEE SCHEDULE
City of Coronado
CURRENT ADJUSTED
Size Basis FY 2023-24 FY 2024-25
FEE # OCCUPANCY (sq. ft.) Effective 7/1/23 Effective 7/1/24 15 Single Family 1 or 2 Family 1,000 $ 301 $ 316
(production/repeat) 2,000 $ 301 $ 316
3,000 $ 314 $ 330
5,000 $ 327 $ 343
7,500 $ 406 $ 427
16 Sprinklers: NFPA 13, 13R, 13D 1,000 $ 327 $ 343
5,000 $ 420 $ 441
12,500 $ 483 $ 507
25,000 $ 651 $ 685
125,000 $ 976 $ 1,026
each additional 125,000 $ 651 $ 685
17 CFC 9.3.4. Supervision and Alarm Only Each standpipe $ 354 $ 372 18 NFPA 72 Fire Alarm
< 1,000 $ 497 $ 523
< 5,000 $ 678 $ 713
each additional 5,000 $ 483 $ 507
19 NFPA 17A Hood Systems
Single $ 327 $ 343
Two $ 420 $ 441
each additional $ 287 $ 302
20 NFPA 17 Suppression Systems Each 500 sf $ 549 $ 577
NFPA 12 Industrial Suppression Systems Each appliance $ 483 $ 507 Resolution No. 2024-16
Exhibit D
Exhibit E
CITY MANAGER'S OFFICE FEE SCHEDULE
City of Coronado
CURRENT ADJUSTED
FY 2023-24 FY 2024-25
FEE # USER FEE Effective 7/1/23 Effective 7/1/24
Commercial Filming Permits (CMC 20.30)
Commercial Filming Application Fee * $50 * $50
Commercial Filming Permit Fee - Itemized to offset cost of providing public services Special Event Permits (CMC 20.30)
Major Event Application Fee $ 329 $ 346
Moderate Event Application Fee $ 164 $ 173
Minor Event Application Fee $ 27 $ 28
NOTE: Fees with * are not subject to CPI adjustment
Resolution No. 2024-16
Exhibit E
Exhibit E
CORONADO PUBLIC LIBRARY
CORONADO PUBLIC LIBRARY SERVICES AND FINES SCHEDULE
City of Coronado
****not subject to CPI****
No. Fines
CURRENT ADJUSTED
FY 2022- 23 FY 2023 -24
Effective 7/1/22 Effective 7/1/23
Overdue Material Fines
1 Children and Teen materials (except DVDs) Eliminated 7/1/22 Eliminated 7/1/22 2 Adult materials (except DVDs) Eliminated 7/1/22 Eliminated 7/1/22 3 DVDs Eliminated 7/1/22 Eliminated 7/1/22
Miscellaneous Fines
Collection agency service charge N/A N/A
4 Returned check fine $25.00 $25.00
5 Replacement of lost/damaged patron library card $1.00 $1.00 Lost Materials Fines
6 Processing fee
(in addition to item replacement charge) $12.00 $12.00
7 Processing fee for magazines
(in addition to current replacement charge) $5.00 $5.00 8 CD or DVD case and liner notes $5.00 $5.00
9 CD or DVD case only $5.00 $5.00
10 Liner notes only $5.00 $5.00
Damaged Materials Fines
11 Material processing fee for damage to Library materials $5.00 $5.00 12 Magazines $3.00 $3.00
13 Barcode label $5.00 $5.00
No. Service Fees
CURRENT ADJUSTED
FY 20201- 22 FY 2022 -23
Effective 7/1/21 Effective 7/1/22
1 Issuance of Non-California Library Card $10.00 $10.00 2 Winn Room Annual Non-Refundable Cleaning Fee $25.00 $25.00 Duplicating Fees
3 Photocopies 15¢ per page 15¢ per page
4 Microfilm printed copy 15¢ per page 15¢ per page
5 Photocopies of Library records by Staff 50¢ per page 50¢ per page 6 Printing from Library Catalog and Databases 15¢ per page 15¢ per page 7 Printing from Internet Computers 15¢ per page 15¢ per page Inter-Library Laon Fees(plus all costsimposed by the lending library) 8 Books $5.00 $5.00
9 Periodical photocopy $1.00 $1.00
Digital Media Lab Color Printing Fees
10 x 50¢ per page 50¢ per page
11 x 60¢ per page 60¢ per page
12 x $1.00 per page $1.00 per page
Digital Media Lab Poster Printing Fees
13 x $5.00 per page $5.00 per page
14 x $10.00 per page $10.00 per page
15 x $13.00 per page $13.00 per page
16 x $17.00 per page $17.00 per page
17 x $18.00 per page $18.00 per page
18 Digital Media Lab 3D Printing 20¢ per gram 20¢ per gram Digital Media Lab Cricut Fees
19 Smart Vinyl N/A 40¢ per inch
20 Transfer Tape N/A 20¢ per inch
Resolution No. 2024-16
Exhibit E
Exhibit F
SPORTS FIELD ALLOCATION FEE SCHEDULE
City of Coronado
****not subject to CPI****
Fee # User Fee Classification
CURRENT ADJUSTED
FY 2023-24 FY 2024-25
Effective Jan. 1, 2023 ($) Effective Jan. 1, 2024 ($)
City-Owned Athletic Fields
1 A (City of Coronado) $0.00 $0.00
2 B (Recreation) $0.00 $0.00
3 C1 (Coronado Youth Org.) $7.25 $7.25
4 C2 (Coronado Schools) $0.00 $0.00
5 C3 (Youth Select, Travel, etc.) $14.50 $14.50
6 D (Adult League) $7.25 $7.25
7 E (Nonresident) $20.50 $20.50
San Diego Port District (Tidelands Park ) Athletic Fields 8 Priority 1A (Coronado Youth Org.) $7.25 $7.25
9 Priority 1B (Select, Travel, etc.) $14.50 $14.50
10 Priority 2 (Adult Resident League) $7.25 $7.25
11 Priority 3 (Public Schools) $0.00 $0.00
12 Priority 4 (Nonresident Youth Sports) $20.50 $20.50
13 Priority 5 (Nonresident Adult Sports) $20.50 $20.50
14 Priority 6 (Individuals/General Public) $0.00 $0.00
All Athletic Fields Miscellaneous Fees
15 Tournament Fee (per field/per day) $154.50 $154.50
16 City Security (when required)* Current Direct Cost Current Direct Cost 17 Clean-Up/Maintenance Fee (when required)* Cost Recovery/ No Less than $50
Cost Recovery/ No Less
than $50
18 Concessions Fee (per season/per org.) $103.00 $103.00 Resolution No. 2024-16