San Diego Region (in $000s)
DRAFT 2025-2029 Regional Transportation Improvement Program MPO ID:
Project Title:
COR04
Coronado, City of
ADOPTION: 25-00
Project Description:
TransNet - LSI: Maint
Citywide - In Coronado, preventive maintenance program to repair or maintain City infrastructure within the traveled way (streets, alleys, sidewalks, bike paths) on a seven-year rotating basis. Projects may consist of asphalt digouts, sidewalk grinding/replacement, repair/replacement of concrete improvements, sign replacement, crack seal, slurry seal, scrub seal and pavement markings.
Street and Road Preventive Maintenance; Minor Drainage Repair Change Notes:
Capacity Status: NCI Exempt Category: Safety - Pavement resurfacing and/or rehabilitation Est Total Cost: $9,242
PE RW CON TOTAL PRIOR 24/25 25/26 26/27 27/28 28/29 FUTURE TransNet - L $1,581 $1,581 $138 $1,443
TransNet - LSI $1,306 $306 $200 $200 $200 $200 $200 $36 $1,270 TransNet - LSI (Cash) $58 $58 $58
TransNet - LSI Carry Over $859 $259 $300 $300 $20 $839
Local Funds $5,438 $3,938 $300 $300 $300 $300 $300 $242 $5,196 TOTAL $9,242 $6,142 $800 $800 $500 $500 $500 $436 $8,806 MPO ID:
Project Title:
COR07 ADOPTION: 25-00
Project Description:
TransNet - LSI: CR
Citywide - In Coronado, citywide rehabilitation or replacement of City infrastructure within the traveled way (streets, alleys, sidewalks, bike paths). Projects may include rehabilitation of severely damaged areas and construction of a new structural pavement surface greater than 1-inch in depth, replacement of concrete alleys, construction of new or replacement of non-conforming sidewalks.
Locations are prioritized based on the most recent Pavement Management Program and evaluation/recommendation by staff.
Street and Road Major Rehabilitation; Major Drainage; Traffic Operations Change Notes:
Capacity Status: NCI Exempt Category: Safety - Pavement resurfacing and/or rehabilitation Est Total Cost: $19,192
PE RW CON TOTAL PRIOR 24/25 25/26 26/27 27/28 28/29 FUTURE TransNet - L $1,665 $1,665 $165 $1,500
TransNet - LSI $6,771 $4,005 $529 $538 $546 $567 $585 $1,838 $4,933 TransNet - LSI Carry Over $5,887 $3,288 $2,599 $666 $5,221 Local Funds $4,869 $4,868 $63 $4,806
TOTAL $19,192 $13,826 $3,128 $538 $546 $567 $585 $2,732 $16,460 * Pending final SANDAG approval
Attachment 2
San Diego Region (in $000s)
2025 Regional Transportation Improvement Program
DRAFT FY 2025-2029 PROGRAM OF PROJECTS
MPO ID:
Project Title:
COR27
Coronado, City of
ADOPTION: 25-00
Project Description:
TransNet - LSI: CR
Citywide - In Coronado, citywide improvements to address inadequate street drainage by performing engineering analysis and constructing new or improving existing storm drain or surface improvements, reducing significant roadway flooding.
Roadway Drainage Improvements
Change Notes:
Capacity Status: NCI Exempt Category: Safety - Pavement resurfacing and/or rehabilitation Est Total Cost: $582
PE RW CON TOTAL PRIOR 24/25 25/26 26/27 27/28 28/29 FUTURE TransNet - LSI $32 $32 $32
TransNet - LSI Carry Over $550 $550 $250 $300
TOTAL $582 $32 $550 $282 $300
* Pending final SANDAG approval
Attachment 2
San Diego Region (in $000s)
2025 Regional Transportation Improvement Program
DRAFT FY 2025-2029 PROGRAM OF PROJECTS
RTIP Fund Types
Local Funding
Local Funds AC Local Funds - Advanced Construction; mechanism to advance local funds to be reimbursed at a later fiscal year with federal/state funds
TransNet-L Prop. A Local Transportation Sales Tax - Local Streets & Roads TransNet-LSI Prop. A Extension Local Transportation Sales Tax - Local System Improvements TransNet-LSI Carry Over TransNet - LSI funds previously programmed but not requested/paid in year of allocation TransNet-LSI (Cash) TransNet - LSI funds which agencies have received payment, but have not spent * Pending final SANDAG approval