CITY OF COSTA MESA PUBLIC SERVICES DEPARTMENT
Wilson Street Improvement Project
CITY PROJECT NO. 22-01
BID OPENING DATE: April 4, 2022

UNIT UNIT UNIT UNIT
NO. DESCRIPTION PRICE TOTAL PRICE TOTAL PRICE TOTAL PRICE TOTAL PRICE TOTAL 1 1 L.S. Mobilization and Demobilization $80,000.00 $80,000.00 $89,263.00 $89,263.00 $140,000.00 $140,000.00 $42,228.00 $42,228.00 $60,000.00 $60,000.00 2 1 F.A. Additional Work Items $100,000.00 $100,000.00 $100,000.00 $100,000.00 $100,000.00 $100,000.00 $100,000.00 $100,000.00 $100,000.00 $100,000.00 3A 30 E.L.T. Procure and Apply Slurry Seal Type II with 2.5% latex Street Surfacing $750.00 $22,500.00 $838.00 $25,140.00 $725.00 $21,750.00 $726.00 $21,780.00 $800.00 $24,000.00 4A 1 L.S. Procure and Apply Crack Seal Prior to Slurry Seal $7,500.00 $7,500.00 $5,197.00 $5,197.00 $7,000.00 $7,000.00 $15,400.00 $15,400.00 $12,000.00 $12,000.00 5A 140 TONS
Remove & Reconstruct Asphalt Concrete (AC) [6"
Minimum Depth, Including Excavation] and Replace
with 6" AC Over 6" Crushed Miscellaneous Base
(CMB)
$200.00 $28,000.00 $197.00 $27,580.00 $185.00 $25,900.00 $178.00 $24,920.00 $260.00 $36,400.00 6A 660 TONS Type "C3" Asphalt Concrete Leveling (Paving Machine) $120.00 $79,200.00 $97.00 $64,020.00 $110.00 $72,600.00 $118.00 $77,880.00 $132.00 $87,120.00 7A 2,000 TONS Type "GG-C" Asphalt Rubber Hot Mix (AHRM-G) Surface Course $115.00 $230,000.00 $97.00 $194,000.00 $110.00 $220,000.00 $107.00 $214,000.00 $125.00 $250,000.00 8A 6 E.A.

Remove Existing and Reconstruct ADA Curb Ramps
with Truncated Domes per CALTRANS STD. Plan
A88A
$7,500.00 $45,000.00 $6,595.00 $39,570.00 $7,500.00 $45,000.00 $14,600.00 $87,600.00 $9,500.00 $57,000.00 9A 820 S.F.

Remove Existing and Reconstruct Portland Cement
Concrete (PCC) Cross-Gutter, Spandrel, Local
Depression, and PCC Pad (8" PCC over 8" CMB)
$40.00 $32,800.00 $43.60 $35,752.00 $32.00 $26,240.00 $35.00 $28,700.00 $29.00 $23,780.00 10A 1,240 L.F.

Remove and Reconstruct Portland Cement Concrete
(PCC) C-6 Curb & Gutter [Include 2' Asphalt Concrete
(AC) Slot Pave]
$80.00 $99,200.00 $61.00 $75,640.00 $67.00 $83,080.00 $104.00 $128,960.00 $75.00 $93,000.00 11A 330 L.F.

Remove and Reconstruct Portland Cement Concrete
(PCC) C-8 Curb & Gutter [Include 2' Asphalt Concrete
(AC) Slot Pave]
$85.00 $28,050.00 $67.50 $22,275.00 $72.00 $23,760.00 $110.00 $36,300.00 $75.00 $24,750.00 12A 1,660 S.F. Install Portland Cement Concrete (PCC) Sidewalk [4" PCC over 4" Crushed Miscellaneous Base (CMB)] $15.00 $24,900.00 $11.70 $19,422.00 $14.00 $23,240.00 $18.00 $29,880.00 $17.00 $28,220.00 13A 2,850 S.F.

Remove and Reconstruct Portland Cement Concrete
(PCC) Driveway Approach [6" PCC over 6" Crushed
Miscellaneous Base (CMB)]
$20.00 $57,000.00 $26.80 $76,380.00 $20.00 $57,000.00 $27.00 $76,950.00 $19.50 $55,575.00 14A 1 L.S.

Remove Existing and Install New Lane Markings,
Striping, Pavement Legends, and Raised Pavement
Markers (RPMs) per Approved Plan
$16,000.00 $16,000.00 $12,566.00 $12,566.00 $16,000.00 $16,000.00 $16,100.00 $16,100.00 $15,000.00 $15,000.00 15A 10 EA Install New Blue Raised Pavement Markers (BRPMs) $20.00 $200.00 $20.90 $209.00 $25.00 $250.00 $21.00 $210.00 $25.00 $250.00 16A 1 L.S.

Remove Existing and Install New Thermoplastic
Pavement Markings, Including Continental Crosswalk
and Green Lanes or Conflict Zones
$40,500.00 $40,500.00 $37,795.00 $37,795.00 $38,500.00 $38,500.00 $40,000.00 $40,000.00 $41,000.00 $41,000.00 17A 14 EA Adjust and Reset Existing Survey Monuments and Ties $600.00 $8,400.00 $516.00 $7,224.00 $1,600.00 $22,400.00 $520.00 $7,280.00 $600.00 $8,400.00 18A1 55 EA Adjust Manhole Covers to Grade $900.00 $49,500.00 $991.00 $54,505.00 $1,100.00 $60,500.00 $924.00 $50,820.00 $1,200.00 $66,000.00 18A2 5 EA Adjust Orange County Sanitation District (OCSD) Manhole Covers to Grade $1,500.00 $7,500.00 $1,460.00 $7,300.00 $4,000.00 $20,000.00 $2,310.00 $11,550.00 $1,600.00 $8,000.00 19A 75 EA Adjust Water Valves to Grade $800.00 $60,000.00 $782.00 $58,650.00 $1,100.00 $82,500.00 $924.00 $69,300.00 $950.00 $71,250.00 20A 163,000 S.F. Cold Mill (2" Minimum Depth) $0.30 $48,900.00 $0.29 $47,270.00 $0.27 $44,010.00 $0.35 $57,050.00 $0.30 $48,900.00 21A 1 L.S. Implement Temporary Traffic Control $70,000.00 $70,000.00 $40,469.00 $40,469.00 $25,000.00 $25,000.00 $90,505.50 $90,505.50 $186,900.00 $186,900.00 22A 35 EA Remove Existing and Install New Type "D" Traffic Signal Loop Detectors $400.00 $14,000.00 $318.00 $11,130.00 $315.00 $11,025.00 $320.00 $11,200.00 $400.00 $14,000.00 23A 30 EA Remove Existing and Install New Type "E" Traffic Signal Loop Detectors $300.00 $9,000.00 $292.00 $8,760.00 $300.00 $9,000.00 $294.00 $8,820.00 $400.00 $12,000.00 24A 745 L.F. Paint Red Curb $2.00 $1,490.00 $1.40 $1,043.00 $1.50 $1,117.50 $1.50 $1,117.50 $2.00 $1,490.00 $1,159,640.00 $1,061,160.00 $1,175,872.50 $1,248,551.00 $1,325,035.00

CITY ESTIMATE
BASE BID TOTAL:

4. SEQUEL CONTRACTORS,
INC.

SANTA FE SPRINGS

QUANTITY
BID

BASE BID CORONA

1. ALL AMERICAN ASPHALT 3. HARDY & HARPER INC.2. R.J. NOBLE COMPANY

LAKE FORESTORANGE
PAGE 1 OF 4
ATTACHMENT 3

CITY OF COSTA MESA PUBLIC SERVICES DEPARTMENT
Wilson Street Improvement Project
CITY PROJECT NO. 22-01
BID OPENING DATE: April 4, 2022
3B 70 E.L.T. Procure and Apply Slurry Seal Type II with 2.5% latex Street Surfacing $750.00 $52,500.00 $617.00 $43,190.00 $725.00 $50,750.00 $726.00 $50,820.00 $800.00 $56,000.00 4B 1 L.S. Procure and Apply Crack Seal Prior to Slurry Seal $7,500.00 $7,500.00 $1,929.00 $1,929.00 $6,500.00 $6,500.00 $16,500.00 $16,500.00 $15,000.00 $15,000.00 5B 580 TONS
Remove & Reconstruct Asphalt Concrete (AC) [6"
Minimum Depth, Including Excavation] and Replace
with 6" AC Over 6" Crushed Miscellaneous Base
(CMB)
$200.00 $116,000.00 $210.00 $121,800.00 $185.00 $107,300.00 $178.00 $103,240.00 $260.00 $150,800.00 6B 380 TONS Type "C3" Asphalt Concrete Leveling (Paving Machine) $120.00 $45,600.00 $97.00 $36,860.00 $110.00 $41,800.00 $118.00 $44,840.00 $132.00 $50,160.00 7B 1,300 TONS Type "GG-C" Asphalt Rubber Hot Mix (AHRM-G) Surface Course $115.00 $149,500.00 $97.00 $126,100.00 $110.00 $143,000.00 $107.00 $139,100.00 $125.00 $162,500.00 8B 2 EA
Remove Existing and reconstruct ADA Curb Ramps
with Truncated Domes per CALTRANS STD. Plan
A88A
$7,500.00 $15,000.00 $7,081.00 $14,162.00 $7,500.00 $15,000.00 $14,600.00 $29,200.00 $9,500.00 $19,000.00 9B 1,100 S.F.

Remove Existing and Reconstruct Portland Cement
Concrete (PCC) Cross-Gutter, Spandrel, Local
Depression, and PCC Pad (8" PCC over 8" CMB)
$40.00 $44,000.00 $27.20 $29,920.00 $32.00 $35,200.00 $35.00 $38,500.00 $29.00 $31,900.00 10B 120 L.F.

Remove and Reconstruct Portland Cement Concrete
(PCC) C-6 Curb & Gutter [Include 2' Asphalt Concrete
(AC) Slot Pave]
$80.00 $9,600.00 $88.80 $10,656.00 $67.00 $8,040.00 $104.00 $12,480.00 $75.00 $9,000.00 11B 800 L.F.

Remove and Reconstruct Portland Cement Concrete
(PCC) C-8 Curb & Gutter [Include 2' Asphalt Concrete
(AC) Slot Pave]
$85.00 $68,000.00 $69.80 $55,840.00 $72.00 $57,600.00 $110.00 $88,000.00 $75.00 $60,000.00 12B 3,140 S.F. Install Portland Cement Concrete (PCC) Sidewalk [4" PCC over 4" Crushed Miscellaneous Base (CMB)] $15.00 $47,100.00 $11.10 $34,854.00 $14.00 $43,960.00 $18.00 $56,520.00 $17.00 $53,380.00 13B 1,730 S.F.

Remove and Reconstruct Portland Cement Concrete
(PCC) Driveway Approach [6" PCC over 6" Crushed
Miscellaneous Base (CMB)]
$20.00 $34,600.00 $19.30 $33,389.00 $20.00 $34,600.00 $27.00 $46,710.00 $19.50 $33,735.00 14B 1 L.S.

Remove Existing and Install New Lane Markings,
Striping, Pavement Legends, and Raised Pavement
Markers (RPMs) per Approved Plan
$16,000.00 $16,000.00 $18,021.00 $18,021.00 $12,500.00 $12,500.00 $12,650.00 $12,650.00 $17,000.00 $17,000.00 15B 7 EA Install New Blue Raised Pavement Markers (BRPMs) $20.00 $140.00 $20.50 $143.50 $25.00 $175.00 $21.00 $147.00 $25.00 $175.00 16B 1 L.S.

Remove Existing and Install New Thermoplastic
Pavement Markings, Including Continental Crosswalk
and Green Lanes or Conflict Zones
$40,500.00 $40,500.00 $38,975.00 $38,975.00 $38,000.00 $38,000.00 $38,000.00 $38,000.00 $43,000.00 $43,000.00 17B 12 EA Adjust and Reset Existing Survey Monuments and Ties $600.00 $7,200.00 $507.00 $6,084.00 $1,600.00 $19,200.00 $520.00 $6,240.00 $600.00 $7,200.00 18B 28 EA Adjust Manhole Covers to Grade $900.00 $25,200.00 $972.00 $27,216.00 $1,100.00 $30,800.00 $924.00 $25,872.00 $1,200.00 $33,600.00 19B 40 EA Adjust Water Valves to Grade $800.00 $32,000.00 $767.00 $30,680.00 $1,100.00 $44,000.00 $924.00 $36,960.00 $950.00 $38,000.00 20B 105,000 S.F. Cold Mill (2" Minimum Depth) $0.30 $31,500.00 $0.29 $30,450.00 $0.27 $28,350.00 $0.35 $36,750.00 $0.35 $36,750.00 21B 1 L.S. Implement Temporary Traffic Control $70,000.00 $70,000.00 $9,692.00 $9,692.00 $20,000.00 $20,000.00 $51,130.00 $51,130.00 $159,800.00 $159,800.00 22B 5 EA Remove Existing and Install New Type "D" Traffic Signal Loop Detectors $400.00 $2,000.00 $312.00 $1,560.00 $315.00 $1,575.00 $320.00 $1,600.00 $400.00 $2,000.00 23B 45 EA Remove Existing and Install New Type "E" Traffic Signal Loop Detectors $300.00 $13,500.00 $287.00 $12,915.00 $300.00 $13,500.00 $294.00 $13,230.00 $400.00 $18,000.00 24B 460 L.F. Paint Red Curb $2.00 $920.00 $1.40 $644.00 $1.50 $690.00 $1.50 $690.00 $2.00 $920.00 $828,360.00 $685,080.50 $752,540.00 $849,179.00 $997,920.00 C-1 120 L.F. Construct 8" High PCC, Type "B' Curb per City Standard Drawing No. 311 $90.00 $10,800.00 $55.00 $6,600.00 $75.00 $9,000.00 $126.00 $15,120.00 $90.00 $10,800.00 C-2 10 C.Y. Install 8" Depth Decomposed Granite (DG) at Pedestriand Refuge Island $650.00 $6,500.00 $650.00 $6,500.00 $500.00 $5,000.00 $1,200.00 $12,000.00 $1,200.00 $12,000.00 C-3 90 S.F. Remove Existing and Reconstruct Concrete Sidewalk (4" Concrete Over 4" CMB) $20.00 $1,800.00 $35.00 $3,150.00 $14.00 $1,260.00 $32.00 $2,880.00 $35.00 $3,150.00 C-4 2 EA Install Truncated Domes (3' X 10') $1,500.00 $3,000.00 $450.00 $900.00 $1,600.00 $3,200.00 $685.00 $1,370.00 $1,000.00 $2,000.00 C-5 2 EA Remove Existing and Install ADA Curb Ramps with Truncated Domes per Caltrans Standard Pland A88A $7,500.00 $15,000.00 $16,000.00 $32,000.00 $8,000.00 $16,000.00 $14,600.00 $29,200.00 $15,000.00 $30,000.00 $37,100.00 $49,150.00 $34,460.00 $60,570.00 $57,950.00
GRAND TOTAL (BASE BID + ADDITIVE BID (B) + ADDITIVE BID (C): $2,025,100.00 $1,795,390.50 $1,962,872.50 $2,158,300.00 $2,380,905.00 ADDITIVE BID (B) TOTAL:

ADDITIVE BID (C) TOTAL:

2. R.J. NOBLE COMPANY 3. HARDY & HARPER INC.ADDITIVE BID ITEM - B

ADDITIVE BID ITEM - C

1. ALL AMERICAN ASPHALT 4. SEQUEL CONTRACTORS, INC.

PAGE 2 OF 4
ATTACHMENT 3

CITY OF COSTA MESA PUBLIC SERVICES DEPARTMENT
Wilson Street Improvement Project
CITY PROJECT NO. 22-01
BID OPENING DATE: April 4, 2022

UNIT UNIT UNIT UNIT
NO. DESCRIPTION PRICE TOTAL PRICE TOTAL PRICE TOTAL PRICE TOTAL 1 1 L.S. Mobilization and Demobilization $80,000.00 $80,000.00 $79,209.02 $79,209.02 $125,000.00 $125,000.00 $89,283.34 $89,283.34 2 1 F.A. Additional Work Items $100,000.00 $100,000.00 $100,000.00 $100,000.00 $100,000.00 $100,000.00 $100,000.00 $100,000.00 3A 30 E.L.T. Procure and Apply Slurry Seal Type II with 2.5% latex Street Surfacing $750.00 $22,500.00 $977.50 $29,325.00 $1,130.00 $33,900.00 $866.08 $25,982.50 4A 1 L.S. Procure and Apply Crack Seal Prior to Slurry Seal $7,500.00 $7,500.00 $8,500.00 $8,500.00 $6,800.00 $6,800.00 $9,149.50 $9,149.50 5A 140 TONS
Remove & Reconstruct Asphalt Concrete (AC) [6"
Minimum Depth, Including Excavation] and Replace
with 6" AC Over 6" Crushed Miscellaneous Base
(CMB)
$200.00 $28,000.00 $405.59 $56,782.60 $385.00 $53,900.00 $268.43 $37,580.43 6A 660 TONS Type "C3" Asphalt Concrete Leveling (Paving Machine) $120.00 $79,200.00 $136.00 $89,760.00 $130.00 $85,800.00 $120.50 $79,530.00 7A 2,000 TONS Type "GG-C" Asphalt Rubber Hot Mix (AHRM-G) Surface Course $115.00 $230,000.00 $152.50 $305,000.00 $120.00 $240,000.00 $118.58 $237,166.67 8A 6 E.A.

Remove Existing and Reconstruct ADA Curb Ramps
with Truncated Domes per CALTRANS STD. Plan
A88A
$7,500.00 $45,000.00 $7,890.00 $47,340.00 $9,000.00 $54,000.00 $9,180.83 $55,085.00 9A 820 S.F.

Remove Existing and Reconstruct Portland Cement
Concrete (PCC) Cross-Gutter, Spandrel, Local
Depression, and PCC Pad (8" PCC over 8" CMB)
$40.00 $32,800.00 $37.00 $30,340.00 $36.00 $29,520.00 $35.43 $29,055.33 10A 1,240 L.F.

Remove and Reconstruct Portland Cement Concrete
(PCC) C-6 Curb & Gutter [Include 2' Asphalt Concrete
(AC) Slot Pave]
$80.00 $99,200.00 $54.50 $67,580.00 $110.00 $136,400.00 $78.58 $97,443.33 11A 330 L.F.

Remove and Reconstruct Portland Cement Concrete
(PCC) C-8 Curb & Gutter [Include 2' Asphalt Concrete
(AC) Slot Pave]
$85.00 $28,050.00 $54.50 $17,985.00 $110.00 $36,300.00 $81.50 $26,895.00 12A 1,660 S.F. Install Portland Cement Concrete (PCC) Sidewalk [4" PCC over 4" Crushed Miscellaneous Base (CMB)] $15.00 $24,900.00 $13.35 $22,161.00 $20.00 $33,200.00 $15.68 $26,020.50 13A 2,850 S.F.

Remove and Reconstruct Portland Cement Concrete
(PCC) Driveway Approach [6" PCC over 6" Crushed
Miscellaneous Base (CMB)]
$20.00 $57,000.00 $25.75 $73,387.50 $25.00 $71,250.00 $24.01 $68,423.75 14A 1 L.S.

Remove Existing and Install New Lane Markings,
Striping, Pavement Legends, and Raised Pavement
Markers (RPMs) per Approved Plan
$16,000.00 $16,000.00 $17,700.00 $17,700.00 $17,000.00 $17,000.00 $15,727.67 $15,727.67 15A 10 EA Install New Blue Raised Pavement Markers (BRPMs) $20.00 $200.00 $23.00 $230.00 $22.00 $220.00 $22.82 $228.17 16A 1 L.S.

Remove Existing and Install New Thermoplastic
Pavement Markings, Including Continental Crosswalk
and Green Lanes or Conflict Zones
$40,500.00 $40,500.00 $43,950.00 $43,950.00 $42,000.00 $42,000.00 $40,540.83 $40,540.83 17A 14 EA Adjust and Reset Existing Survey Monuments and Ties $600.00 $8,400.00 $2,150.50 $30,107.00 $500.00 $7,000.00 $981.08 $13,735.17 18A1 55 EA Adjust Manhole Covers to Grade $900.00 $49,500.00 $1,000.00 $55,000.00 $800.00 $44,000.00 $1,002.50 $55,137.50 18A2 5 EA Adjust Orange County Sanitation District (OCSD) Manhole Covers to Grade $1,500.00 $7,500.00 $3,100.00 $15,500.00 $1,500.00 $7,500.00 $2,328.33 $11,641.67 19A 75 EA Adjust Water Valves to Grade $800.00 $60,000.00 $1,100.00 $82,500.00 $500.00 $37,500.00 $892.67 $66,950.00 20A 163,000 S.F. Cold Mill (2" Minimum Depth) $0.30 $48,900.00 $0.61 $99,430.00 $0.50 $81,500.00 $0.39 $63,026.67 21A 1 L.S. Implement Temporary Traffic Control $70,000.00 $70,000.00 $39,350.00 $39,350.00 $50,000.00 $50,000.00 $72,037.42 $72,037.42 22A 35 EA Remove Existing and Install New Type "D" Traffic Signal Loop Detectors $400.00 $14,000.00 $350.00 $12,250.00 $310.00 $10,850.00 $335.50 $11,742.50 23A 30 EA Remove Existing and Install New Type "E" Traffic Signal Loop Detectors $300.00 $9,000.00 $325.00 $9,750.00 $280.00 $8,400.00 $315.17 $9,455.00 24A 745 L.F. Paint Red Curb $2.00 $1,490.00 $1.55 $1,154.75 $2.00 $1,490.00 $1.66 $1,235.46 $1,159,640.00 $1,334,291.87 $1,313,530.00 $1,243,073.40

CITY ESTIMATE
BID

QUANTITY

LONG BEACHCORONA

6. PALP DBA EXCEL PAVING AVERAGE5. EBS GENERAL
ENGINEERING INC.

BASE BID
BASE BID TOTAL:

PAGE 3 OF 4
ATTACHMENT 3

CITY OF COSTA MESA PUBLIC SERVICES DEPARTMENT
Wilson Street Improvement Project
CITY PROJECT NO. 22-01
BID OPENING DATE: April 4, 2022
3B 70 E.L.T. Procure and Apply Slurry Seal Type II with 2.5% latex Street Surfacing $750.00 $52,500.00 $954.50 $66,815.00 $1,000.00 $70,000.00 $803.75 $56,262.50 4B 1 L.S. Procure and Apply Crack Seal Prior to Slurry Seal $7,500.00 $7,500.00 $7,658.00 $7,658.00 $9,000.00 $9,000.00 $9,431.17 $9,431.17 5B 580 TONS
Remove & Reconstruct Asphalt Concrete (AC) [6"
Minimum Depth, Including Excavation] and Replace
with 6" AC Over 6" Crushed Miscellaneous Base
(CMB)
$200.00 $116,000.00 $390.00 $226,200.00 $400.00 $232,000.00 $270.50 $156,890.00 6B 380 TONS Type "C3" Asphalt Concrete Leveling (Paving Machine) $120.00 $45,600.00 $153.40 $58,292.00 $143.00 $54,340.00 $125.57 $47,715.33 7B 1,300 TONS Type "GG-C" Asphalt Rubber Hot Mix (AHRM-G) Surface Course $115.00 $149,500.00 $153.00 $198,900.00 $138.00 $179,400.00 $121.67 $158,166.67 8B 2 EA
Remove Existing and reconstruct ADA Curb Ramps
with Truncated Domes per CALTRANS STD. Plan
A88A
$7,500.00 $15,000.00 $7,890.00 $15,780.00 $9,800.00 $19,600.00 $9,395.17 $18,790.33 9B 1,100 S.F.

Remove Existing and Reconstruct Portland Cement
Concrete (PCC) Cross-Gutter, Spandrel, Local
Depression, and PCC Pad (8" PCC over 8" CMB)
$40.00 $44,000.00 $36.00 $39,600.00 $54.00 $59,400.00 $35.53 $39,086.67 10B 120 L.F.

Remove and Reconstruct Portland Cement Concrete
(PCC) C-6 Curb & Gutter [Include 2' Asphalt Concrete
(AC) Slot Pave]
$80.00 $9,600.00 $100.00 $12,000.00 $156.00 $18,720.00 $98.47 $11,816.00 11B 800 L.F.

Remove and Reconstruct Portland Cement Concrete
(PCC) C-8 Curb & Gutter [Include 2' Asphalt Concrete
(AC) Slot Pave]
$85.00 $68,000.00 $51.50 $41,200.00 $140.00 $112,000.00 $86.38 $69,106.67 12B 3,140 S.F. Install Portland Cement Concrete (PCC) Sidewalk [4" PCC over 4" Crushed Miscellaneous Base (CMB)] $15.00 $47,100.00 $13.25 $41,605.00 $27.00 $84,780.00 $16.73 $52,516.50 13B 1,730 S.F.

Remove and Reconstruct Portland Cement Concrete
(PCC) Driveway Approach [6" PCC over 6" Crushed
Miscellaneous Base (CMB)]
$20.00 $34,600.00 $25.00 $43,250.00 $36.00 $62,280.00 $24.47 $42,327.33 14B 1 L.S.

Remove Existing and Install New Lane Markings,
Striping, Pavement Legends, and Raised Pavement
Markers (RPMs) per Approved Plan
$16,000.00 $16,000.00 $13,857.50 $13,857.50 $15,000.00 $15,000.00 $14,838.08 $14,838.08 15B 7 EA Install New Blue Raised Pavement Markers (BRPMs) $20.00 $140.00 $23.00 $161.00 $21.00 $147.00 $22.58 $158.08 16B 1 L.S.

Remove Existing and Install New Thermoplastic
Pavement Markings, Including Continental Crosswalk
and Green Lanes or Conflict Zones
$40,500.00 $40,500.00 $41,680.60 $41,680.60 $40,000.00 $40,000.00 $39,942.60 $39,942.60 17B 12 EA Adjust and Reset Existing Survey Monuments and Ties $600.00 $7,200.00 $2,150.50 $25,806.00 $500.00 $6,000.00 $979.58 $11,755.00 18B 28 EA Adjust Manhole Covers to Grade $900.00 $25,200.00 $1,000.00 $28,000.00 $800.00 $22,400.00 $999.33 $27,981.33 19B 40 EA Adjust Water Valves to Grade $800.00 $32,000.00 $1,100.00 $44,000.00 $500.00 $20,000.00 $890.17 $35,606.67 20B 105,000 S.F. Cold Mill (2" Minimum Depth) $0.30 $31,500.00 $0.63 $66,150.00 $0.50 $52,500.00 $0.40 $41,825.00 21B 1 L.S. Implement Temporary Traffic Control $70,000.00 $70,000.00 $39,350.00 $39,350.00 $85,500.00 $85,500.00 $60,912.00 $60,912.00 22B 5 EA Remove Existing and Install New Type "D" Traffic Signal Loop Detectors $400.00 $2,000.00 $350.00 $1,750.00 $310.00 $1,550.00 $334.50 $1,672.50 23B 45 EA Remove Existing and Install New Type "E" Traffic Signal Loop Detectors $300.00 $13,500.00 $325.00 $14,625.00 $280.00 $12,600.00 $314.33 $14,145.00 24B 460 L.F. Paint Red Curb $2.00 $920.00 $1.55 $713.00 $2.00 $920.00 $1.66 $762.83 $828,360.00 $1,027,393.10 $1,158,137.00 $911,708.27
C-1 120 L.F. Construct 8" High PCC, Type "B' Curb per City Standard Drawing No. 311 $90.00 $10,800.00 $84.00 $10,080.00 $110.00 $13,200.00 $90.00 $10,800.00 C-2 10 C.Y. Install 8" Depth Decomposed Granite (DG) at Pedestriand Refuge Island $650.00 $6,500.00 $520.00 $5,200.00 $650.00 $6,500.00 $786.67 $7,866.67 C-3 90 S.F. Remove Existing and Reconstruct Concrete Sidewalk (4" Concrete Over 4" CMB) $20.00 $1,800.00 $55.25 $4,972.50 $32.00 $2,880.00 $33.88 $3,048.75 C-4 2 EA Install Truncated Domes (3' X 10') $1,500.00 $3,000.00 $1,965.00 $3,930.00 $1,900.00 $3,800.00 $1,266.67 $2,533.33 C-5 2 EA Remove Existing and Install ADA Curb Ramps with Truncated Domes per Caltrans Standard Pland A88A $7,500.00 $15,000.00 $7,890.00 $15,780.00 $9,800.00 $19,600.00 $11,881.67 $23,763.33 $37,100.00 $39,962.50 $45,980.00 $48,012.08
GRAND TOTAL (BASE BID + ADDITIVE BID (B) + ADDITIVE BID (C )): $2,025,100.00 $2,401,647.47 $2,517,647.00 $2,202,793.75 ADDITIVE BID (C) TOTAL:

ADDITIVE BID ITEM - B 5. EBS GENERAL ENGINEERING INC. 6. PALP DBA EXCEL PAVING AVERAGE

ADDITIVE BID ITEM - C
ADDITIVE BID (B) TOTAL:

PAGE 4 OF 4
ATTACHMENT 3