FOR PAYMENT ON THE WARRANT LIST OF: 8/26/2022 CITY OF COSTA MESA DATE: 8/15/2022 20th (FINAL) Payment to:

NATIONWIDE CONTRACTING SERVICES, INC DBA NATIONWIDE
GENERAL CONSTRUCTION SERVICES PAGE: 1 OF 1
10725 ELLIS AVE, UNIT I, FOUNTAIN VALLEY, CA 92708
PERIOD: 3/1/2021-5/28/2022
PROJECT: CITYWIDE PARKWAY MAINTENANCE PROJECT (ZONES 6 AND 7) CITY PROJECT 20-07
P.O. No. 13661
PROJECT "A"

ITEM BID UNIT PREVIOUS QUANTITY TOTAL QUANTITY PREVIOUS AMOUNT TOTAL ORIGINAL CONTRACT

NO QUANTITY DESCRIPTION PRICE QUANTITY THIS ESTIMATE TO DATE AMOUNT THIS EST TO DATE PRICE 1 13,820 LF Remove and Reconstruct Curb & Gutter (C-6) (6" CMB with 2' AC Slot Pave) $62.00 11,991.0 LF 0.0 LF 11,991.0 LF $743,442.00 $0.00 $743,442.00 $856,840.00 2 1,560 LF Remove and Reconstruct Curb & Gutter (C-8) (6" CMB with 2' AC Slot Pave) $69.00 984 LF 0 LF 984 LF $67,896.00 $0.00 $67,896.00 $107,640.00 3 100 LF Remove and Reconstruct Type "A" Curb $28.00 0 LF 0 LF 0 LF $0.00 $0.00 $0.00 $2,800.00 4 47,070 SF Concrete Sidewalk (4" Concrete over 4" CMB) $14.00 42,357.5 SF 0.0 SF 42,357.5 SF $593,005.00 $0.00 $593,005.00 $658,980.00 5 1,330 L.F. Install Concrete V-gutter
(6” Concrete over 6” CMB with 2’ AC Slot Pave) $46.00 101 L.F. 0 L.F. 101 L.F. $4,646.00 $0.00 $4,646.00 $61,180.00 6 27,010 SF Concrete Driveway/Driveway Approach (6" Concrete over 6" CMB) $16.00 22,174.5 SF 0.0 SF 22,174.5 SF $354,792.00 $0.00 $354,792.00 $432,160.00 7 250 TON Misc AC Pavement (not being paid in other bid items) $170.00 34.2 TON 0.0 TON 34.2 TON $5,814.00 $0.00 $5,814.00 $42,500.00 8 9,470 SF Remove and Reconstruct Concrete Cross Gutter, Spandrel, and Concrete Pad (with 8" CMB and 3' AC Slot Pave) $62.00 8,392.5 SF 0.0 SF 8,392.5 SF $520,335.00 $0.00 $520,335.00 $587,140.00 9 3 EA Remove and Reconstruct Parkway drain No. 2 $2,875.00 2 EA 0 EA 2 EA $5,750.00 $0.00 $5,750.00 $8,625.00 10 380 L.F. Construct Retaining Wall Variable Height (4 ft max) $175.00 216 L.F. 0 L.F. 216 L.F. $37,800.00 $0.00 $37,800.00 $66,500.00 11 66 EA Install Truncated Domes (Yellow) $260.00 36 EA 0 EA 36 EA $9,360.00 $0.00 $9,360.00 $17,160.00 12 3,870 LF Prune Tree Roots and Install Root Barrier $13.00 304 LF 0 LF 304 LF $3,952.00 $0.00 $3,952.00 $50,310.00 13 1,570 LF Paint Curb $5.00 658 LF 0.0 LF 658.0 LF $3,290.00 $0.00 $3,290.00 $7,850.00 14 1 FA Removal and/or Restoration of existing improvements per specifications (fences, parkway concrete, landscaping) $5,000.00 100 % 0 % 100 % $5,000.00 $0.00 $5,000.00 $5,000.00 15 1 FA Additional Work Items $150,000.00 0 % 0 % 0 % $0.00 $0.00 $0.00 $150,000.00

15.01 1 FA Wakeforest Rd install new ADA ramps $38,322.00 100 % 0 % 100 % $38,322.00 $0.00 $38,322.00

15.02 1 FA 18th St and Lions Park install new ADA ramps $17,692.00 100 % 0 % 100 % $17,692.00 $0.00 $17,692.00

15.03 1 FA 18th St Install new Refuge Pedestrian Island $9,626.00 100 % 0 % 100 % $9,626.00 $0.00 $9,626.00

15.04 1 FA ADA sidewalks at 1865 Plumer St $22,512.00 100 % 0 % 100 % $22,512.00 $0.00 $22,512.00

15.05 1 FA Bernard St cg, dw approach reconstruction, abandon sump pump, and reconnection of (4) wm $90,395.00 100 % 0 % 100 % $90,395.00 $0.00 $90,395.00

15.06 1 FA ADA ramp at 1865 Plumer St $5,000.00 100 % 0 % 100 % $5,000.00 $0.00 $5,000.00

15.07 1 FA 565 W. 18th St Police SubStation Traffic Signal Pullbox Sw Reconstruction $4,000.00 100 % 0 % 100 % $4,000.00 $0.00 $4,000.00

15.08 1 FA Charle St new sw, and reconstruction of cg, dw approach and reconnection of (3) wm $115,000.00 100 % 0 % 100 % $115,000.00 $0.00 $115,000.00

15.09 1 FA Charle St new sw, and reconstruction of cg, dw approach and reconnection of (3) wm $96,829.00 100 % 0 % 100 % $96,829.00 $0.00 $96,829.00

15.10 1 FA Redwood Ave, Sandalwood St reconstruction of cg, sw, and dw approach $269,648.45 100 % 0 % 100 % $269,648.45 $0.00 $269,648.45

15.11 1 FA Mesa Dr Water meter and gas adjustments behind meters, and drainage construction behind retaining wall. $68,902.04 100 % 0 % 100 % $68,902.04 $0.00 $68,902.04

15.12 1 FA Additional Locations of Truncated Domes $17,030.00 100 % 0 % 100 % $17,030.00 $0.00 $17,030.00

15.13 1 FA 2984 Royal Palm Dr sidewalk reconstruction w/ 2 sack slurry $12,612.40 29 % 71 % 100 % $3,657.60 $8,954.80 $12,612.40 23a 1,000 L.F. Grind Existing PCC Gutter Plate $17.25 0 L.F. 0 L.F. 0 L.F. $0.00 $0.00 $0.00 $17,250.00 23b 1 LS Procure and furnish walk behind Crate-Plane model # CPM8-9H $7,475.00 100 % 0 % 100 % $7,475.00 $0.00 $7,475.00 $7,475.00 24 1,600 S.F. Concrete Sidewalk at City Parks (6"PCC over native) $17.25 4,979 S.F. 0.0 S.F. 4,978.5 S.F. $85,879.13 $0.00 $85,879.13 $27,600.00 PROJECT "A" TOTAL: $3,207,050.22 $8,954.80 $3,216,005.02 $3,107,010.00 PROJECT "B"
16 5 EA Remove Existing and Reconstruct Curb Ramp per Caltrans Std.

Plan A88A $5,750.00 6 EA 0 EA 6 EA $34,500.00 $0.00 $34,500.00 $28,750.00 17 1,050 S.F. Remove Existing and Construct 4” Thick PCC Sidewalk Over 4” CMB per City of Costa Mesa Std Plan No 411 $20.00 4,467 S.F. 0 S.F. 4,467 S.F. $89,340.00 $0.00 $89,340.00 $21,000.00 18 1,650 S.F.

Remove Existing PCC Sidewalk and unclassified materials to a depth of 4’ below the proposed finish grade and Construct 4” Thick PCC Sidewalk per details shown on plan
$25.00 576 S.F. 0 S.F. 576 S.F. $14,400.00 $0.00 $14,400.00 $41,250.00 19 1,760 S.F. Remove Existing and Construct Cross Gutter per City of Costa Mesa Std Plan No 415 $60.00 1,454 S.F. 0 S.F. 1,454 S.F. $87,240.00 $0.00 $87,240.00 $105,600.00 20 3 EA Concrete Driveway/Driveway Approach
(6” Concrete over 6” CMB) $5,525.00 3 EA 0 EA 3 EA $16,575.00 $0.00 $16,575.00 $16,575.00 21 4 EA Install Truncated Domes (Yellow) $260.00 0 EA 0 EA 0 EA $0.00 $0.00 $0.00 $1,040.00 22 1 LS Install Striping, Legends, and Pavement Markers $21,100.00 100 % 0 % 100 % $21,100.00 $0.00 $21,100.00 $21,100.00 PROJECT "B" TOTAL: $263,155.00 $0.00 $263,155.00 $235,315.00 CO1 1 LS Fire Station #4 AC Parking Lot Reconstruction (12" PCC w/ rebar over 12"CMB) 53,387.08$ 100.00 % 0.00 % 100.00 % $53,387.08 $0.00 $53,387.08 $53,387.08 CHANGE ORDER TOTAL: $53,387.08 $0.00 $53,387.08 $53,387.08 PROJECT "A" AND "B" TOTAL: $3,523,592.30 $8,954.80 $3,532,547.10 $3,395,712.08

CHANGE ORDERS
ATTACHMENT 1