Cities Index.
1. Final Costs

Costa Mesa City Council
October 18, 2022

Document
1. Final Costs
Meeting
October 18, 2022
Body
Costa Mesa City Council
Original file
12 KB
Text extracted from the city's file for reading and search. Open the original on costamesa.legistar1.com. That file is the official record.

ATTACHMENT 1
FINAL COSTS FOR FIRE STATION NO. 3 IMPROVEMENTS AND REPAIRS PROJECT, CITY PROJECT NO. 21-06

ITEM UNIT PREVIOUS QUANTITY TOTAL QUANTITY PREVIOUS AMOUNT TOTAL CONTRACT

NO DESCRIPTION PRICE QUANTITY THIS ESTIMATE TO DATE AMOUNT THIS EST TO DATE PRICE 1 Bonds $13,000.00 100.00 % 0.00 % 100.00 % $13,000.00 $0.00 $13,000.00 $13,000.00 Mobilization $11,000.00 100.00 % 0.00 % 100.00 % $11,000.00 $0.00 $11,000.00 $11,000.00 2 Clear & Grub $5,000.00 100.00 % 0.00 % 100.00 % $5,000.00 $0.00 $5,000.00 $5,000.00 Tree & Root Ball Removal $8,000.00 100.00 % 0.00 % 100.00 % $8,000.00 $0.00 $8,000.00 $8,000.00 Soil Removal/Disposal $17,000.00 100.00 % 0.00 % 100.00 % $17,000.00 $0.00 $17,000.00 $17,000.00 Existing Drain Removal $0.00 0.00 % 0.00 % 0.00 % $0.00 $0.00 $0.00 $0.00 Irrigation Demolition $1,000.00 100.00 % 0.00 % 100.00 % $1,000.00 $0.00 $1,000.00 $1,000.00 PCC Demoilition $7,000.00 100.00 % 0.00 % 100.00 % $7,000.00 $0.00 $7,000.00 $7,000.00 New Trench Drain $23,000.00 100.00 % 0.00 % 100.00 % $23,000.00 $0.00 $23,000.00 $23,000.00 New Parkway Drain $8,000.00 100.00 % 0.00 % 100.00 % $8,000.00 $0.00 $8,000.00 $8,000.00 New PCC Sidewalk & C&G $12,000.00 100.00 % 0.00 % 100.00 % $12,000.00 $0.00 $12,000.00 $12,000.00 New PCC Swale $20,000.00 100.00 % 0.00 % 100.00 % $20,000.00 $0.00 $20,000.00 $20,000.00 New Irrigation $4,000.00 100.00 % 0.00 % 100.00 % $4,000.00 $0.00 $4,000.00 $4,000.00 New grass (Hydroseed), 90 days Maintenance Period, As-Built and Warranty Items $10,000.00 80.00 % 20.00 % 100.00 % $8,000.00 $2,000.00 $10,000.00 $10,000.00 3 Roof & Sheating Demolition $7,000.00 100.00 % 0.00 % 100.00 % $7,000.00 $0.00 $7,000.00 $7,000.00 Roof Drain & Piping Demoilition $2,000.00 100.00 % 0.00 % 100.00 % $2,000.00 $0.00 $2,000.00 $2,000.00 Repair Existing Roof Substraight $7,000.00 100.00 % 0.00 % 100.00 % $7,000.00 $0.00 $7,000.00 $7,000.00 New Equipment Platform $0.00 0.00 % 0.00 % 0.00 % $0.00 $0.00 $0.00 $0.00 Cut Parapet for New Scuppers $3,000.00 100.00 % 0.00 % 100.00 % $3,000.00 $0.00 $3,000.00 $3,000.00 New Scuppers & Down Piping $5,000.00 100.00 % 0.00 % 100.00 % $5,000.00 $0.00 $5,000.00 $5,000.00 Repair Roof, match existing $16,000.00 100.00 % 0.00 % 100.00 % $16,000.00 $0.00 $16,000.00 $16,000.00 Repair Damaged Soffit Areas $4,000.00 100.00 % 0.00 % 100.00 % $4,000.00 $0.00 $4,000.00 $4,000.00 Brick Roof & Sheating Demoilition $11,000.00 100.00 % 0.00 % 100.00 % $11,000.00 $0.00 $11,000.00 $11,000.00 New Roof framing, Facia $29,000.00 100.00 % 0.00 % 100.00 % $29,000.00 $0.00 $29,000.00 $29,000.00 New Shingle Roof $4,000.00 100.00 % 0.00 % 100.00 % $4,000.00 $0.00 $4,000.00 $4,000.00 Sandblast Waterproofing $7,000.00 100.00 % 0.00 % 100.00 % $7,000.00 $0.00 $7,000.00 $7,000.00 4 Gypsum Board Demolition $4,000.00 100.00 % 0.00 % 100.00 % $4,000.00 $0.00 $4,000.00 $4,000.00 Remove & Reinstall Light Fixtures $2,000.00 100.00 % 0.00 % 100.00 % $2,000.00 $0.00 $2,000.00 $2,000.00 New 5/8" Gyp. & Insulation $11,000.00 100.00 % 0.00 % 100.00 % $11,000.00 $0.00 $11,000.00 $11,000.00 Patch & Paint $3,000.00 100.00 % 0.00 % 100.00 % $3,000.00 $0.00 $3,000.00 $3,000.00 TOTAL ALLOWANCES $20,000.00 $20,000.00

1.1 Allowance No.1.1:
-Install Four (4) New Scuppers, Two (2) New Roof Drains, and Reroute Existing Sewer Line Below New Swale:$14,488.76 ; -Relocate Existing Irrigation Box and Reroute Irrigation Main, Gas, Telephone Lines: $3,626.61 ; - Credit for Trees and Stump Removal:<4,150.00>
$13,965.37 100.00 % 0.00 % 100.00 % $13,965.37 $0.00 $13,965.37

1.2 Allowance No.1.2:

General and Release of Claims Agreement $6,034.63 100.00 % 0.00 % 100.00 % $6,034.63 $0.00 $6,034.63 $272,000.00 $2,000.00 $274,000.00 $274,000.00

FACILITY INTERIOR WORK
TOTAL (PAGE 1):

BID QUANTITY

SITE WORK

FACILITY EXTERIOR WORK

ALLOWANCES

MOBILIZATION/DEMOBILIZATION

← All documents from this meeting