Bid Results for Project PLACENTIA AVENUE, WEST 19TH STREET, AND EAST 17TH STREET PAVEMENT REHABILITATION, BICYCLE FACILITY, AND STRIPING IMPROVEMENTS PROJECT (22-08) Bid Due on November 29, 2022 2:00 PM (PST)
Item
Num Section Item
Code Description Unit of
Measure Quantity All American
Asphalt - Unit Price
All American
Asphalt - Line Total
R.J. NOBLE
COMPANY - Unit
Price
R.J. NOBLE COMPANY
- Line Total
Hardy and Harper,
Inc. - Unit Price
Hardy and Harper,
Inc. - Line Total
PALP dba Excel
Paving - Unit Price
PALP dba Excel
Paving - Line Total
Onyx Paving Company,
Inc. - Unit Price
Onyx Paving Company,
Inc. - Line Total
1 Bid Schedule Proposal 1 Mobilization and Project Scheduling for Projects “A1,” “A2,” “B,” and “C” below L.S. 1 $158,262.20 $158,262.20 $155,000.00 $155,000.00 $150,000.00 $150,000.00 $298,000.00 $298,000.00 $227,000.00 $227,000.00 2 Bid Schedule Proposal 2 Additional Work Items for Projects “A1,” “A2,” “B,” and “C” belowF.A 1 $75,000.00 $75,000.00 $75,000.00 $75,000.00 $75,000.00 $75,000.00 $75,000.00 $75,000.00 $75,000.00 $75,000.00 3 Bid Schedule Proposal 3 Temporary Traffic Control for Projects “A1,” “A2,” “B,” and “C” belowL.S. 1 $50,100.00 $50,100.00 $155,000.00 $155,000.00 $289,550.00 $289,550.00 $139,987.00 $139,987.00 $372,000.00 $372,000.00 4 Bid Schedule Proposal 4 Adjust and Reset Existing Survey Monuments and Ties per California Licensed Land Surveyor for Projects “A1,” “A2,” “B,” and “C” belowEA 35 $733.00 $25,655.00 $645.00 $22,575.00 $650.00 $22,750.00 $600.00 $21,000.00 $1,000.00 $35,000.00 Subtotal $309,017.20 $407,575.00 $537,300.00 $533,987.00 $709,000.00 5 Project “A1”: Placentia Avenue (from Adams Ave. to Wilson St.): 5 Cold Mill (2-inch Minimum Depth) S.F. 424500 $0.37 $157,065.00 $0.43 $182,535.00 $0.40 $169,800.00 $0.36 $152,820.00 $0.45 $191,025.00 6 Project “A1”: Placentia Avenue (from Adams Ave. to Wilson St.): 6 2-inch Asphalt Rubber Hot Mix (ARHM) Asphalt Concrete (AC) Pavement Overlay TON 5350 $120.50 $644,675.00 $134.00 $716,900.00 $125.00 $668,750.00 $132.00 $706,200.00 $142.00 $759,700.00 7 Project “A1”: Placentia Avenue (from Adams Ave. to Wilson St.): 7 Adjust Manhole Covers to Grade EA 8 $1,260.00 $10,080.00 $1,250.00 $10,000.00 $1,500.00 $12,000.00 $995.00 $7,960.00 $2,000.00 $16,000.00 8 Project “A1”: Placentia Avenue (from Adams Ave. to Wilson St.): 8 Adjust Water Valves to Grade EA 15 $787.50 $11,812.50 $1,400.00 $21,000.00 $1,400.00 $21,000.00 $1,200.00 $18,000.00 $2,000.00 $30,000.00 9 Project “A1”: Placentia Avenue (from Adams Ave. to Wilson St.): 9 Install Type “F” or modified Type “F” Traffic Signal Loops EA 14 $399.00 $5,586.00 $340.00 $4,760.00 $400.00 $5,600.00 $450.00 $6,300.00 $500.00 $7,000.00 10 Project “A1”: Placentia Avenue (from Adams Ave. to Wilson St.): 10 Install Type “E” Traffic Signal Loops EA 25 $355.00 $8,875.00 $315.00 $7,875.00 $400.00 $10,000.00 $380.00 $9,500.00 $500.00 $12,500.00 11 Project “A1”: Placentia Avenue (from Adams Ave. to Wilson St.): 11A Procure and Install Green K71 Self Re-erecting Flexible Marker Posts (includes All Appurtenant Parts and Equipment to Properly Install these K71 Marker Posts) [from Adams Ave. to Wilson St.] EA 221 $278.25 $61,493.25 $290.00 $64,090.00 $280.00 $61,880.00 $293.00 $64,753.00 $300.00 $66,300.00 12 Project “A1”: Placentia Avenue (from Adams Ave. to Wilson St.): 11B Procure Green K-71 Self Re-erecting Flexible Marker Posts (includes All Appurtenant Parts and Equipment) that will be Used as Spares and Stored in the City’s Corporation Yard
EA 45 $210.00 $9,450.00 $220.00 $9,900.00 $210.00 $9,450.00 $235.00 $10,575.00 $300.00 $13,500.00 13 Project “A1”: Placentia Avenue (from Adams Ave. to Wilson St.): 12 Signing and Striping: Install Lane Markings, Striping, Pavement Legends, Blue Raised Pavement Markers (BRPMs), Raised Pavement Markers (RPMs), and All Thermoplastic Markings, including Green Thermoplastic Markings as Shown on Signing & Striping Plan (from Adams Ave. to Wilson St.)
L.S. 1 $122,797.50 $122,797.50 $116,000.00 $116,000.00 $130,000.00 $130,000.00 $113,000.00 $113,000.00 $222,975.00 $222,975.00 Subtotal $1,031,834.25 $1,133,060.00 $1,088,480.00 $1,089,108.00 $1,319,000.00 14 Project “A2”: Placentia Avenue (from Wilson St. to W. 16th St.): 13 Slurry Seal Type II with 2.5% Latex, including Organic Weed Kill E.L.T. 450 $388.15 $174,667.50 $350.00 $157,500.00 $330.00 $148,500.00 $462.00 $207,900.00 $500.00 $225,000.00 15 Project “A2”: Placentia Avenue (from Wilson St. to W. 16th St.): 14 Crack Seal L.S. 1 $26,880.00 $26,880.00 $28,000.00 $28,000.00 $35,000.00 $35,000.00 $26,000.00 $26,000.00 $27,400.00 $27,400.00 16 Project “A2”: Placentia Avenue (from Wilson St. to W. 16th St.): -- ITEM DELETED -- 0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $1.00 $0.00 $0.00 $0.00 17 Project “A2”: Placentia Avenue (from Wilson St. to W. 16th St.): 16A Remove Existing Decorative Crosswalk at Placentia Ave. & W. 20th St.

Replace with 6-inch Asphalt Concrete (AC) Surface Course Pavement Mill & Overlay
TONS 26 $419.00 $10,894.00 $770.00 $20,020.00 $600.00 $15,600.00 $1,800.00 $46,800.00 $400.00 $10,400.00 18 Project “A2”: Placentia Avenue (from Wilson St. to W. 16th St.): 16B Cold Mill (2-inch Minimum Depth) S.F. 780 $10.80 $8,424.00 $2.75 $2,145.00 $2.00 $1,560.00 $6.00 $4,680.00 $0.45 $351.00 19 Project “A2”: Placentia Avenue (from Wilson St. to W. 16th St.): 17A Remove Existing Brick Paver Crosswalks at Placentia Ave. & W. 19th St. (all Four Legs of the Intersection). Replace with 4-inch Asphalt Concrete (AC) Surface Course Pavement Mill & Overlay
TONS 95 $419.00 $39,805.00 $601.00 $57,095.00 $600.00 $57,000.00 $600.00 $57,000.00 $400.00 $38,000.00 20 Project “A2”: Placentia Avenue (from Wilson St. to W. 16th St.): 17B Cold Mill (4-inch Minimum Depth) S.F. 3750 $20.70 $77,625.00 $5.25 $19,687.50 $1.00 $3,750.00 $5.00 $18,750.00 $3.00 $11,250.00 ATTACHMENT 2

Page 1 of 2 ends

City of Costa Mesa
Bid Results for Project PLACENTIA AVENUE, WEST 19TH STREET, AND EAST 17TH STREET PAVEMENT REHABILITATION, BICYCLE FACILITY, AND STRIPING IMPROVEMENTS PROJECT (22-08) Bid Due on November 29, 2022 2:00 PM (PST)
Item
Num Section Item
Code Description Unit of
Measure Quantity All American
Asphalt - Unit Price
All American
Asphalt - Line Total
R.J. NOBLE
COMPANY - Unit
Price
R.J. NOBLE COMPANY
- Line Total
Hardy and Harper,
Inc. - Unit Price
Hardy and Harper,
Inc. - Line Total
PALP dba Excel
Paving - Unit Price
PALP dba Excel
Paving - Line Total
Onyx Paving Company,
Inc. - Unit Price
Onyx Paving Company,
Inc. - Line Total
21 Project “A2”: Placentia Avenue (from Wilson St. to W. 16th St.): 18 Signing and Striping: Install Lane Markings, Striping, Pavement Legends, Blue Raised Pavement Markers (BRPMs), Raised Pavement Markers (RPMs), and All Thermoplastic Markings, including Green Thermoplastic Markings as Shown on Signing & Striping Plan (from Wilson St. to W. 16th St.)
L.S. 1 $142,537.50 $142,537.50 $137,000.00 $137,000.00 $130,000.00 $130,000.00 $156,000.00 $156,000.00 $222,044.00 $222,044.00 22 Project “A2”: Placentia Avenue (from Wilson St. to W. 16th St.): 19 Install modified Type “F” Traffic Signal Loops EA 3 $399.00 $1,197.00 $340.00 $1,020.00 $400.00 $1,200.00 $450.00 $1,350.00 $500.00 $1,500.00 23 Project “A2”: Placentia Avenue (from Wilson St. to W. 16th St.): 20 Remove Existing and Install Flashing In-Roadway Lights across Placentia Ave. at W. 20th St., includes Street Pavement Work around the In- Roadway Lights
L.S. 1 $64,501.50 $64,501.50 $43,000.00 $43,000.00 $50,000.00 $50,000.00 $39,000.00 $39,000.00 $55.00 $55.00 Subtotal $546,531.50 $465,467.50 $442,610.00 $557,480.00 $536,000.00 24 Project “B”: West 19th Street (from Sundance Dr. to Park Ave.): 21A Digouts – Remove & Reconstruct Asphalt Concrete (AC) 6-inch Minimum Depth (from Sundance Dr. to Placentia Ave.) TONS 1000 $225.00 $225,000.00 $214.00 $214,000.00 $465.00 $465,000.00 $279.00 $279,000.00 $272.00 $272,000.00 25 Project “B”: West 19th Street (from Sundance Dr. to Park Ave.): 21B Digouts – Crushed Miscellaneous Base (CMB), including Excavation (from Sundance Dr. to Placentia Ave.) CY 1900 $110.70 $210,330.00 $228.00 $433,200.00 $90.00 $171,000.00 $256.00 $486,400.00 $222.00 $421,800.00 26 Project “B”: West 19th Street (from Sundance Dr. to Park Ave.): 22 Slurry Seal Type II with 2.5% Latex, including Organic Weed Kill (from Sundance Dr. to Pomona Ave.) E.L.T. 200 $475.15 $95,030.00 $350.00 $70,000.00 $330.00 $66,000.00 $563.00 $112,600.00 $600.00 $120,000.00 27 Project “B”: West 19th Street (from Sundance Dr. to Park Ave.): 23 Crack Seal (from Sundance Dr. to Pomona Ave.) L.S. 1 $13,440.00 $13,440.00 $14,000.00 $14,000.00 $15,000.00 $15,000.00 $13,000.00 $13,000.00 $13,600.00 $13,600.00 28 Project “B”: West 19th Street (from Sundance Dr. to Park Ave.): 24A Intersection of Sundance Dr. & W. 19th St.: 2-inch Asphalt Concrete (AC) Surface Course Pavement Mill & Overlay TONS 110 $173.00 $19,030.00 $275.00 $30,250.00 $200.00 $22,000.00 $160.00 $17,600.00 $400.00 $44,000.00 29 Project “B”: West 19th Street (from Sundance Dr. to Park Ave.): 24B Cold Mill (2-inch Minimum Depth) S.F. 8000 $2.20 $17,600.00 $2.70 $21,600.00 $3.00 $24,000.00 $3.00 $24,000.00 $0.45 $3,600.00 30 Project “B”: West 19th Street (from Sundance Dr. to Park Ave.): 25 Signing and Striping: Install Lane Markings, Striping, Pavement Legends, Blue Raised Pavement Markers (BRPMs), Raised Pavement Markers (RPMs), and All Thermoplastic Markings, including Green Thermoplastic Markings as Shown on Signing & Striping Plan (from Sundance Dr. to Park Ave.)
L.S. 1 $149,310.00 $149,310.00 $132,000.00 $132,000.00 $120,000.00 $120,000.00 $110,000.00 $110,000.00 $137,000.00 $137,000.00 31 Project “B”: West 19th Street (from Sundance Dr. to Park Ave.): 26 Adjust Manhole Covers to Grade EA 1 $1,260.00 $1,260.00 $1,250.00 $1,250.00 $1,500.00 $1,500.00 $995.00 $995.00 $2,000.00 $2,000.00 32 Project “B”: West 19th Street (from Sundance Dr. to Park Ave.): 27 Adjust Water Valves to Grade EA 9 $787.50 $7,087.50 $1,400.00 $12,600.00 $1,400.00 $12,600.00 $1,200.00 $10,800.00 $2,000.00 $18,000.00 Subtotal $738,087.50 $928,900.00 $897,100.00 $1,054,395.00 $1,032,000.00 33 Project “C”: East 17th Street (from Newport Blvd. to Fullerton Ave.): 28 Cold Mill (2-inch Minimum Depth) S.F. 37400 $0.71 $26,554.00 $0.95 $35,530.00 $0.90 $33,660.00 $1.00 $37,400.00 $0.45 $16,830.00 34 Project “C”: East 17th Street (from Newport Blvd. to Fullerton Ave.): 29 2-inch Asphalt Rubber Hot Mix (ARHM) Asphalt Concrete (AC) Pavement Overlay TON 455 $171.25 $77,918.75 $165.00 $75,075.00 $150.00 $68,250.00 $153.00 $69,615.00 $142.00 $64,610.00 35 Project “C”: East 17th Street (from Newport Blvd. to Fullerton Ave.): 30 Adjust Water Valves to Grade EA 3 $787.50 $2,362.50 $1,400.00 $4,200.00 $1,400.00 $4,200.00 $1,200.00 $3,600.00 $2,000.00 $6,000.00 36 Project “C”: East 17th Street (from Newport Blvd. to Fullerton Ave.): 31 Install Type “F” Traffic Signal Loops EA 6 $399.00 $2,394.00 $340.00 $2,040.00 $400.00 $2,400.00 $450.00 $2,700.00 $500.00 $3,000.00 37 Project “C”: East 17th Street (from Newport Blvd. to Fullerton Ave.): 32 Install Type “E” Traffic Signal Loops EA 10 $355.00 $3,550.00 $315.00 $3,150.00 $400.00 $4,000.00 $380.00 $3,800.00 $500.00 $5,000.00 38 Project “C”: East 17th Street (from Newport Blvd. to Fullerton Ave.): 33 Signing and Striping: Install Lane Markings, Striping, Pavement Legends, Blue Raised Pavement Markers (BRPMs), and Raised Pavement Markers (RPMs) per Existing Layout
L.S. 1 $7,297.50 $7,297.50 $7,700.00 $7,700.00 $7,000.00 $7,000.00 $6,300.00 $6,300.00 $45,560.00 $45,560.00 Subtotal $120,076.75 $127,695.00 $119,510.00 $123,415.00 $141,000.00 Total $2,745,547.20 $3,062,697.50 $3,085,000.00 $3,358,385.00 $3,737,000.00 ATTACHMENT 2