Cities Index.
1. Final Cost Summary

Costa Mesa City Council
April 1, 2025

Document
1. Final Cost Summary
Meeting
April 1, 2025
Body
Costa Mesa City Council
Original file
593 KB
Text extracted from the city's file for reading and search. Open the original on costamesa.legistar1.com. That file is the official record.

CITY OF COSTA MESA

PROJECT COST SUMMARY
Contractor: KAZONI CONSTRUCTION
20371 Irvine Ave Ste 120, Newport Beach, CA 92660
Project: COSTA MESA PD INDOOR RANGE UPGRADES
CITY PROJECT 22-03
ITEM

NO DESCRIPTION COST

ORIGINAL CONTRACT VALUE
PD INDOOR RANGE UPGRADES ORIGINAL CONTRACT VALUE: 1,931,077.00$

PROJECT COSTS
1 MOBILIZATION, OVERHEAD, BONDING, AND STATED PROFIT 228,470.07$ 2 HAZMAT 24,959.83$
3 CLEAN-UP 11,600.00$
4 CONCRETE 16,600.00$
5 STEEL 94,251.89$
6 ELECTRICAL 123,251.17$
7 PLUMBING 57,933.40$
8 FIRE LIFE SAFTEY 76,860.29$
9 ADA SITE WORK 10,100.00$
10 LULA ELEVATOR 246,026.19$
11 ADA RESTROOM UPGRADES 8,024.37$
12 RANGE UPGRADES 464,666.95$
13 OFFICES/CLEANING ROOM 5,811.47$
14 FRAMING/DRYWALL/INSULATION 107,822.00$
15 FLOORING 43,350.00$
16 DOOR/FRAMES/HARDWARE 34,400.00$
17 ACCUSTICAL CEILING 64,249.50$
18 MILLWORK 30,984.00$
19 RESTROOM ADA 23,242.00$
20 HVAC 218,129.02$
21 ROOFING 24,090.00$
22 PAINTING 18,400.00$
23 SIGNAGE 7,875.00$
24 CCTV 34,530.51$
TOTAL PROJECT COST: 1,975,627.66$

CONTRACT CHANGE ORDER
CCO#1 Modification of shooting range exhaust system CCO#1: 44,550.66$

FINAL COST SUMMARY
ATTACHMENT 1

← All documents from this meeting