629
File #: 25-388 Meeting Date: 9/2/2025
testing, removal and demolition of pre-existing structured cables and patch panels. A written warranty commitment for a 10-year minimum is required, and the contractor is to be on-site for contiguous days until work is completed.
ANALYSIS:
On November 11, 2024, Purchasing issued Request for Proposal #25-05 (Attachment 1) on the City’s bid portal. A mandatory pre-proposal conference was held, and the bid was closed on December 13, 2024. The proposals were evaluated based on the qualifications of experience of key personnel (45%), the qualifications of firm (30%), and cost (25%). The submittals were reviewed by the City of Costa Mesa IT Manager, City of Costa Mesa Deputy Public Works Director, and the City of Santa Ana IT Manager. The top three (3) proposals moved onto the interview phase of the evaluation. The evaluation team recommends BCS Consultants based on the scoring below.
RFP NO. 25-05 CAT6A Structured Cable, Fiber, and Verkada Camera Installation Proposers Proposal Scores Interview Scores Total Rank
BCS 1340.25 1410 2750.25 1st
X-Act 1198.5 1270 2468.5 2nd
NetXperts 1242 Declined 1242 3rd
BCS Consultants had the highest score overall, by a margin of 8.9%. All three evaluators individually rated them as the best overall solution. Their photographic examples demonstrated an enterprise understanding that was of the highest level of detail. They also included strong documentation and engineering examples. BCS Consultants submitted a bid proposal in the amount of $740,684. The licenses and references of BCS Consultants have been checked, and staff have found them to be in good standing.
Therefore, staff recommend awarding BCS a Professional Services Agreement (Attachment 2) in the amount of $740,684 for a two-year term, with the option of a one (1) one-year renewal.
Staff is also seeking City Council authorization for a five percent (5%) contingency in the amount of $37,034 for unforeseen costs. The vendor’soriginal proposal (Attachment 3) and revised proposal with updated pricing (Attachment 4) are provided. Upon City Council award of the Professional Services Agreement (Attachment 2), BCS Consultants will furnish the necessary bonds and insurance, which will be approved as to form by Risk Management. Upon the award and subsequent execution of the agreement, a “Notice to Proceed” will be issued.
The following locations will receive new CAT6A cabling:
Location Address # of Cabling
1. City Hall 77 Fair Drive 700
2. Communications 79 Fair Drive 128
3. Corporate Yard 2310 Placentia Avenue 48
4. Downtown Recreation Center 1860 Anaheim Avenue 96
5. Fire Station 2 800 West Baker Street 24
6. Fire Station 3 1865 Park Avenue 24
630
File #: 25-388 Meeting Date: 9/2/2025
7. Fire Station 4 2300 Placentia Avenue 24
8. Fire Station 5 2450 Vanguard 24
9. Fire Station 6 3350 Sakioka Drive 24
10.Police Sub-Station 3333 Bristol Street 100
11.Senior Center 695 West 19th Street 96
12.Spare for all Sites Various Addresses 164
13.Westside Sub-Station 565 West 18th Street 48
Cabling Drops Total: 1,500
ALTERNATIVES:
The City Council may decide not to authorize the project; however, staff does not recommend this action. Not proceeding with this project will prohibit the upgrade to a VoIP telephone system, as well as adversely affecting the Police Department’s safety functions.
FISCAL REVIEW:
Funding for the Information Technology Department’s CAT6A cabling project inclusive of the contingency is budgeted in the Information Technology Replacement Fund (Fund 603). Additional funding for this project, if needed, is available in savings from completed projects in the Information Technology Strategic Plan (ITSP).
LEGAL REVIEW:
The City Attorney’s Office has reviewed this staff report and approved it as to form.
CITY COUNCIL GOALS AND PRIORITIES:
This item supports the following City Council Goals:
· Strengthen the public’s safety and improve the quality of life. · Maintain and Enhance the City’s Facilities, Equipment and Technology.
CONCLUSION:
Staff recommends the City Council:
1. Authorize the City Manager and City Clerk to execute a Professional Services Agreement (PSA) for structured cable and camera installation to BCS Consultants, 9910 Irvine Center Drive, Irvine, CA 92618 in the amount of $740,684 for a two-year term, with the option for a one (1) one-year renewal.
2. Authorize a five percent (5%) contingency in the amount of $37,034 for unforeseen costs.
3. Authorize the City Manager or designee to execute future authorized amendments to the agreement.
631
REQUEST FOR PROPOSAL 25-05
FOR
CAT6A Structured Cable, Fiber & Verkada Camera Installation Services Information Technology Department
CITY OF COSTA MESA
Released on November 14, 2024
RFP Facilitator: Mike Fuentes 714-754-5310
[email protected]
ATTACHMENT 1
632
REQUEST FOR PROPOSAL
FOR
CAT6A Structured Cable, Fiber and Verkada Camera Installation Services
The City of Costa Mesa (hereinafter referred to as the “City”) is requesting Proposals from qualified consultants for CAT6A Structured Cable , Fiber and Verkada Camera Installation Services for the Information Technology Department. The awarded Contract, (hereinafter referred to as “Contract”) shall be in accordance with the Sample Professional Service Agreement, Appendix B terms, conditions, and scope of work. Prior to submitting a Proposal, Proposers are advised to carefully read the instructions below, including the Sample Professional Service Agreement and any solicitati on appendix/exhibits. The term is expected to be for 3 year(s) with two one-year renewal options. The City reserves the right to award one or more contracts for this service.
I. GENERAL INFORMATION
The City of Costa Mesa is a general law city, which operates under the council/manager form of government with an annual General Fund budget of over $ 189.9 million and a total budget of over $240.10 million for fiscal year 2024-2025.
The City of Costa Mesa, incorporated in 1953, has an estimated population of 115,000 and has a land area of 16.8 square miles. It is located in the northern coastal area of Orange County, California, and is bordered by the cities of Santa Ana, Newport Beach, Huntington Beach, Fountain Valley and Irvine.
The City is a “full service city” providing a wide range of services. These services include: police and fire protection; animal control; emergency medical aid; building safety regulation and inspection; street lighting; land use planning and zoning; housi ng and community development; maintenance and improvement of streets and related structures; traffic safety maintenance and improvement; and full range of recreational and cultural programs.
The City of Costa Mesa is home to the Segerstrom Center for the Arts, Orange County Fairgrounds, South Coast Repertory Theater and the South Coast Plaza Shopping Center, which is the single largest commercial activity center in the City. The volume of sales generated by South Coast Plaza secures its place as the highest volume regional shopping center in the nation.
The successful Proposer, shall have experience in similar types of services. All Proposers responding to this Request for Proposal (RFP) will be evaluated on the basis of their expertise, prior experience on similar projects, demonstrated competence, abil ity to meet the requested services, adequate staffing, reference checks, understanding of services, cost and responsiveness to the needs and concerns of the City of Costa Mesa.
1. Important Notice: The City has attempted to provide all information available. It is the responsibility of each Proposer to review, evaluate, and, where necessary, request any clarification prior to submission of a Proposal. Proposers are not to contact other City personnel with any questions or clarifications concerning this Request for Proposal (RFP). The City’s Purchasing Department contact set out in RFP, Section II, Subsection 2, 633
Inquires, will provide all official communication concerning this RFP. Any City response relevant to this RFP other than through or approved by City’s Purchasing Department is unauthorized and will be considered invalid.
If clarification or interpretation of this solicitation is considered necessary by City, a written addendum shall be issued and the information will be posted on PlanetBids. Any interpretation of, or correction to, this solicitation will be made only by addendum issued by the City’s Purchasing Department. It is the responsibility of each Proposer to periodically check PlanetBids website to ensure that it has received and reviewed any and all addenda to this solicitation. The City will not be responsible for any other explanations, corrections to, or interpretations of the documents, including any oral information.
2. Schedule of Events: This Request For Proposal shall be governed by the following schedule:
3. Release of RFP November 14 2024 at 5:00pm
4. Mandatory Pre-Proposal Conference November 21, 2024 at 8:00am
5. Deadline for Written Questions November 25, 2024 at 10:00am.
6. Responses to Questions Posted December 5 2024 at 5:00pm
7. Proposals are Due December 13, 2024 at 10:00am
8. Interviews (if held) January 21-22, 2025
9. Approval of Contract January/February 2025
**All dates are subject to change at the discretion of the City.
Pre-Proposal Conference: A MANDATORY Pre -Proposal conference will be held on November 21 at 8:00 a.m. at various locations within City of Costa Mesa. A Pre -Proposal conference is held to allow for questions and clarification concerning the City’s RFP process, scope of services and subsequent contract award. Potential bidders must have a representative present at each walk through site to be eligible to bid.
3. Proposer’s Minimum Requirements: Interested and qualified Proposers that can demonstrate their ability to successfully provide the required services outlined in Appendix A– Scope of Work, of this RFP are invited to submit a proposal, provided they me et the following requirements. All requirements must be met at the time of the proposal due date. If these requirements are not met, the proposal may not receive further consideration, as determined in the sole discretion of the City.
1. Must pay/require payment of prevailing wages.
2. Must be an established business with a minimum of ten (10) years of industry experience.
3. Must be an accredited business with the Better Business Bureau.
4. Must be registered with a Cooperative Agreement that can be utilized by the City of Costa Mesa.
5. Must provide a brief summary of the company’s qualifications, experience, capability, and professional certifications and licenses.
634
6. Must describe the size of the company, and indicate the principal, company official(s), and other personnel who will be assigned to work on the project.
7. Must provide three Municipal/County client references; please include contact information.
8. Must state whether the company is a party to a lawsuit with any public entity. If so, please provide the case number and a brief summary of the cause of action.
9. Must state whether the contractor has ever been a party to any contract that was terminated by any public entity; please include the name of the public entity, nature of the contract, and reasons for termination.
10. Must demonstrate satisfactory financial conditions to carry out the work.
11. Must possess licenses/permits required to perform structured cable installations in the specified jurisdiction.
12. Must be fully conversant and capable in the cabling of low-voltage applications such as, but not limited to, data, voice, and imaging network systems.
13. All structured cable connecting hardware must be made by an ISO 9001:2000 Certified Manufacturer. All products must meet the technical requirements listed in the RFP. Any products not meeting these requirements will not be considered.
II. GENERAL INSTRUCTIONS AND PROVISIONS
1. Proposal Format Guidelines: Interested entities or contractors are to provide the City of Costa Mesa with a thorough Proposal using the following guidelines: Proposal should be typed and should contain no more than 20 typed pages using a 12 -point font size, including transmittal letter and resumes of key people, but excluding Index/Table of Contents, tables, charts, graphic exhibits and pricing forms. Each Proposal will adhere to the following order and content of sections. Proposal should be straightforward, concise and provide “laym an” explanations of technical terms that are used. Emphasis should be concentrated on conforming to the RFP instructions, responding to the RFP requirements, and on providing a complete and clear description of the offer. Proposals which appear unrealisti c in terms of technical commitments, lack of technical competence or are indicative of failure to comprehend the complexity and risk of this contract may be rejected. The following Proposal sections are to be included in the Proposer’s response:
• Cover Letter: A cover letter, not to exceed three pages in length, should summarize key elements of the Proposal. An individual authorized to bind the Contractor must sign the letter. Indicate the address and telephone number of the contractor’s office located nearest to Costa Mesa, California, and the office from which the project will be managed. Include proposed working relationship among the offering agency and subcontractors, if applicable.
• Background and Project Summary Section: The Background and Project Summary Section should describe your understanding of the City, the work to be done, and the objectives to be accomplished. Refer to Scope of Work, Appendix A of this RFP.
635
• Method of Approach: Provide a detailed description of the approach and methodology that will be used to fulfill each requirement listed in the Scope of Work of this RFP. The section should include:
1. An implementation plan that describes in detail (i) the methods, including controls by which your firm manages projects of the type sought by this RFP; (ii) methodology for soliciting and documenting views of internal and external stakeholders; (iii) and any other project management or implementation strategies or techniques that the respondent intends to employ in carrying out the work.
2. Detailed description of efforts your firm will undertake to achieve client satisfaction and to satisfy the requirements of the "Scope of Work" section.
3. Detailed project schedule, identifying all tasks and deliverables to be performed, durations for each task, and overall time of completion.
4. Detailed description of specific tasks you will require from City staff. Explain what the respective roles of City staff and your staff would be to complete the tasks specified in the Scope of Work.
5. Proposers are encouraged to provide additional innovative and/or creative approaches for providing the service that will maximize efficient, safe, and cost - effective operations or increased performance capabilities. • Qualifications & Experience of the Firm: Describe the qualifications and experience of the organization or entity performing services/projects within the past eight years that are similar in size and scope to demonstrate competence to perform these services. Information shall include:
1. If the owner is a corporation please provide: Name of corporation, corporate office street address, city, state, and zip code, state where incorporated, date of incorporation, first and last name of officers, local office address, city, state & zip, and the date local office opened its doors for business.
2. If the owner is a partnership or joint venture, please provide: Name of partnership or joint venture, principal office street address, city, state, and zip code, state of organization, date of organization, first and last name of general partner(s), local office address, city, state, and zip code, and date local office opened its doors for.
3. List all businesses owned or controlled by yourself (applicant) or business manager doing similar business in California under another business name. List business name and address and specify who owns or controls the business (e.g., self, business manager, etc.).
4. List all businesses for which you or your business manager is or was an officer, director, or partner doing similar business in California under another business name.
List business name and address, title, date(s) in position; specify who was in position (e.g., self, business manager, etc.).
5. How many years have you been in business under your present business name? 636
6. Provide a list of current and previous contracts similar to the requirements for Costa Mesa, including all public agencies served (if any). For each, provide a brief description of the scope of work performed, the length of time you have been providing services, and the name, title, and telephone number of the person who may be contacted regarding your organization’s service record. Provide a sample of each background investigation for each contract.
7. Submit a description of the organization’s qualifications, experience and abilities that make it uniquely capable to provide the services specified in the Scope of Work.
8. The City of Costa Mesa is interested in knowing how Proposers support the communities that they serve. Please provide information on your organization’s participation in local community, charitable and civic organizations and events, including membership i n the Costa Mesa Chamber of Commerce, charitable contributions made by your organization, etc.
Any public entity which submits a Proposal should describe in detail how it currently performs services like those identified in the Scope of Work within its or other jurisdictions, including photographs, written policies and/or video of services provided. If you have performed these services under contract for another public entity, please provide references for those entities as set forth above for private Proposers.
• Financial Capacity: The City is concerned about bidders’ financial capability to perform, therefore, may ask you to provide sufficient data to allow an evaluation of firm’s financial capabilities.
• Key Personnel: It is essential that the Proposer provide adequate experienced personnel, capable of and devoted to the successful accomplishment of work to be performed under this contract. The Proposer must agree to assign specific individuals to the key positions. o Identify the members of the staff who would be assigned to act for Proposer’s firm in key management and field positions providing the services described in the Proposal, and the functions to be performed by each.
o Include resumes or curriculum vitae of each such staff member, including name, position, telephone number, email address, education, and years and type of experience. Describe for each such person, the relevant transactions on which they have worked.
• Cost Proposal: Provide a fee schedule/pricing information for the project as referenced in the attached in Appendix C. Proposals shall be valid for a minimum of 180 days following submission.
• Disclosure: Please disclose any and all past or current business and personal relationships with any current Costa Mesa elected official, appointed official, City employee, or family member of any current Costa Mesa elected official, appointed official, or City employee. Any past or current business relationship may or may not disqualify the firm from consideration.
• Sample Professional Service Agreement: The firm selected by the City will be required to execute a Professional Services Agreement with the City. A sample of the Agreement is 637
enclosed as Appendix B, but may be modified to suit the specific services and needs of the City. If a Proposer has any exceptions or conditions to the Agreement, these must be submitted for consideration with the Proposal. Otherwise, the Proposer will be deemed to have accepted the form of Agreement. See No. 12 of this RFP below.
• Checklist of Forms to Accompany Proposal: The following is a list of the forms, Appendix C included in this RFP, which must be completed in full and included with Proposals:
1. Vendor Application Form
2. Company Profile & References
3. Ex Parte Communications Certificate
4. Disclosure of Government Positions
5. Disqualifications Questionnaire
6. Bidder/Applicant/Contractor Campaign Contribution
7. Cost Proposal
2. Process for Submitting Proposals:
• Content of Proposal: The Proposal must be submitted using the format as indicated in the Proposal format guidelines.
• Preparation of Proposal: Each Proposal shall be prepared simply and economically, avoiding the use of elaborate promotional material beyond those sufficient to provide a complete, accurate and reliable presentation.
• Cost for Preparing Proposal : The cost for developing the Proposal is the sole responsibility of the Proposer. All Proposals submitted become the property of the City. Fee proposal shall be submitted in a separate file containing the following:
✓ Cover letter stating the total lump sum fee.
✓ A spreadsheet with a detailed fee schedule of the proposed costs. Each fee schedule shall depict individual project tasks, number of hours assigned for specific personnel and their basic hourly rates, mark up on supplies, if any, etc..
• Forms to Accompany Proposal: Appendix C forms shall be attached at the end of the Proposal with the exception of the Cost Proposal which shall be submitted in a separate file.
• Number of Proposals: Submit one (1) PDF file format copy of your proposal in sufficient detail for thorough evaluation and comparative analysis
• Submission of Proposals: Complete written Proposals must be submitted electronically in PDF file format via the planetbids.com website not later than 10:00 a.m. (P.S.T) on December 13, 2024. Proposals will not be accepted after this deadline.
Bids received after the scheduled closing time will not be accepted. It shall be the sole responsibility of the Bidder to see that the bid is received by the deadline. Faxed or e-mailed Proposals will not be accepted. NO EXCEPTIONS.
638
• Inquiries: Questions about this RFP must be posted in the Q & A tab on Planetbids no later than November 25, 202 4 at 10:00 A.M. The City reserves the right not to answer all questions.
The City reserves the right to amend or supplement this RFP prior to the Proposal due date.
All addenda, responses to questions received, and additional information will be posted to the Costa Mesa Procurement Registry, Costa Mesa-Official City Web Site, Business-Bids & RFP's. Proposers should check this web page daily for new information.
From the date that this RFP is issued until a firm or entity is selected and the selection is announced, firms or public entities are not allowed to communicate outside the process set forth in this RFP with any City employee other than the contracting off icer listed herein regarding this RFP. The City reserves the right to reject any Proposal for violation of this provision. No questions other than posted on Planetbids will be accepted, and no response other than written will be binding upon the City.
• Conditions for Proposal Acceptance: This RFP does not commit the City to award a contract or to pay any costs incurred for any services. The City, at its sole discretion, reserves the right to accept or reject any or all Proposals received as a result of this RFP, to negotiate with any qualified source(s), or to cancel this RFP in part or in its entirety. The City may waive any irregularity in any Proposal. All Proposals will become the property of the City of Costa Mesa, California. If any proprietary information is contained in the Proposal, it should be clearly identified.
• Insurance & W-9 Requirements: Upon recommendation of contract award, Contractor will be required to submit the following documents with ten (10) days of City notification, unless otherwise specified in the solicitation:
▪ Insurance - City requires that licensees, lessees, and Contractors have an approved Certificate of Insurance (not a declaration or policy) or proof of legal self-insurance on file with the City for the issuance of a permit or contract. Within ten (10) consecutive calendar days of award of contract, successful Bidder must furnish the City with the Certificates of Insurance proving coverage as specified in the sample contract.
▪ W-9 – Current signed form W -9 (Taxpayer Identification Number & Certification) which includes Contractor’s legal business name(s).
3. Evaluation Criteria: The City’s evaluation and selection process will be conducted in accordance with Title II, Chapter V, Article 2 of the City's Municipal Code (Code). In accordance with the Code, the most qualified responsive and responsible proposer shall be determined based on evaluation of qualitative factors in addition to cost. At all times during the evaluation process, the following criteria will be used. Sub -criteria are not necessarily listed in order of importance. Additional sub-criteria that logically fit within a particular evaluation criteria may also be considered even if not specified below.
1. Qualifications of Experience of Key Personnel ------- 45%
2. Qualifications of the Firm ----30%
639
3. Cost Proposal ---- 25%
4. Evaluation of Proposals and Selection Process: In accordance with its Municipal Code, the City will adhere to the following procedures in evaluating Proposals. An Evaluation Committee, which may include members of the City's staff and possibly one or more outside experts, will screen and review all Proposals according to the weighted criteria set forth above.
While price is one basic factor for award, it is not the sole consideration.
A. Responsiveness Screening : Proposals will first be screened to ensure responsiveness to the RFP. The City may reject as non-responsive any Proposal that does not include the documents required to be submitted by this RFP. At any time during the evaluation process, the City rese rves the right to request clarifications or additional information from any or all Proposers regarding their Proposals.
B. Initial Proposal Review: The Committee will initially review and score all responsive written Proposals based upon the Evaluation Criteria set forth above. The Committee may also contact Proposer's references. Proposals that receive the highest evaluation scores may be invited to the next stage of the evaluation process. The City may reject any Proposal in which a Proposer’s approach, qualifications, or price is not considered acceptable by the City. An unacceptable Proposal is one that would have to be substantially rewritten to make it acceptable. The City may conclude the evaluation process at this point and recommend award to the most qualified or lowest responsible bidder. Alternatively, the City may elect to negotiate directly with one or more Proposers to obtain the best result for the City prior to making a recommendation or selection.
C. Interviews, Reference Checks, Revised Proposals, Discussions: Following the initial screening and review of Proposals, the Proposers included in this stage of the evaluation process may be invited to participate in an oral interview. Interviews, if held, are tentatively scheduled for the week of January 21-22 2025 and will be conducted at City of Costa Mesa City Hall, 77 Fair Drive, Costa Mesa, CA 92626. This date is subject to change. The individual(s) from Proposer's organization that will be directly responsible for carrying out the contract, if awarded, should be present at the oral interview. The oral interview may, but is not required to, use a written question/answer format for the purpose of clarifying the intent of any portions of the Proposal.
In addition to conducting an oral interview, the City may during this stage of the evaluation process also contact and evaluate the Proposer’s references, contact any Proposer to clarify any response or request revised or additional information, contact any current users of a Proposer’s services, solicit information from any available source concerning any aspect of a Proposal, and seek and review any other information deemed pertinent to the evaluation process.
Following conclusion of this stage of the evaluation process, the Committee will again rank all Proposers according to the evaluation criteria set forth above. The Committee may conclude the evaluation process at this point, and make a recommendation for award, or it may request Best and Final Offers from Proposers. The City may accept the Proposal or negotiate the terms and conditions of the agreement with the highest 640
ranked organization. The City may recommend award without Best and Final Offers, so Proposers should include their best Proposal with their initial submission.
Recommendation for award is contingent upon the successful negotiation of final contract terms. Negotiations shall be confidential and not subject to disclosure to competing Proposers unless an agreement is reached. If contract negotiations cannot be concluded successfully within a time period determined by the City, the City may terminate negotiations and commence negotiations with the next highest scoring Proposer or withdraw the RFP.
5. Protests: Failure to comply with the rules set forth herein may result in rejection of the protest.
Protests based upon restrictive specifications or alleged improprieties in the Proposal procedure, which are apparent or reasonably should have been discovered prio r to receipt of Proposals shall be filed in writing with the City’s Purchasing Department at least 10 calendar days prior to the deadline for receipt of Proposals. The protest must clearly specify in writing the grounds and evidence on which the protest is based.
Protests based upon alleged improprieties that are not apparent or that could not reasonably have been discovered prior to submission date of the Proposals, such as disputes over the staff recommendation for contract award, shall be submitted in writing to the City’s Purchasing Department, within 48 hours from receipt of the notice from the City advising of City’s recommendation for award of contrac t. The protest must clearly specify in writing the grounds and evidence on which the protest is based. The City’s Purchasing Department will respond to the protest in writing at least 3 days prior to the meeting at which City’s recommendation to the City Council will be considered. Should Proposer decide to appeal the response of the City’s Purchasing Department, and pursue its protest at the Council meeting, it will notify the City’s Purchasing Department of its intention at least 2 days prior to the scheduled meeting.
A. Procedure – All protests shall be typed under the protester’s letterhead and submitted in accordance with the provisions stated herein. All protests shall include at a minimum the following information:
• The name, address and telephone number of the protester; • The signature of the protester or the protester’s representative; • The solicitation or contract number;
• A detailed statement of the legal and/or factual grounds for the protest; and • The form of relief requested.
6. Accuracy of Proposals: Proposers shall take all responsibility for any errors or omissions in their Proposals.
If prior to contract award, a Proposer discovers a mistake in their Proposal which renders the Proposer unwilling to perform under any resulting contract, the Proposer must immediately notify the facilitator and request to withdraw the Proposal. It shall be solely within the City's discretion as to whether withdrawal will be permitted. If the solicitation contemplated evaluation and award of "all or none" of the items, then any withdrawal must be for the entire Proposal. If the solicitation provided for evaluation and award on a line item or combination of items basis, the City may consider permitting withdrawal of specific line item(s) or combination of items. Any Proposer who withdraws a Proposal will be ineligible to bid further on the work included in the RFP scope.
641
7. Responsibility of Proposers: The City shall not be liable for any expenses incurred by potential Contractors in the preparation or submission of their Proposals. Pre -contractual expenses are not to be included in the Contractor’s Pricing Sheet. Pre -contractual expenses are defined as , including but not limited to, expenses incurred by Proposer in:
• Preparing Proposal in response to this RFP;
• Submitting that Proposal to the City;
• Negotiating with the City any matter related to the Proposal; and, • Any other expenses incurred by the Proposer prior to the date of the award and execution, if any, of the contract.
8. Confidentiality: The California Public Records Act (Cal. Govt. Code Sections 7920.000, et seq.) mandates public access to government records. Therefore, unless information is exempt from disclosure by law, the content of any request for explanation, exception, or substitution, response to this RFP, protest, or any other written communicatio n between the City and Proposer, shall be available to the public. The City intends to release all public portions of the Proposals following the evaluation proce ss at such time as a recommendation is made to the City Council.
If Proposer believes any communication contains trade secrets or other proprietary information that the Proposer believes would cause substantial injury to the Proposer’s competitive position if disclosed, the Proposer shall request that the City withhold from disclosure the proprietary information by marking each page containing such proprietary information as confidential.
Proposer may not designate its entire Proposal as confidential nor designate its Price Proposal as confidential.
Submission of a Proposal shall indicate that, if Proposer requests that the City withhold from disclosure information identified as confidential, and the City complies with the Proposer’s request, Proposer shall assume all responsibility for any challenges resulting from the non - disclosure, indemnify and hold harmless the City from and against all damages (including but not limited to attorney’s fees and costs that may be awarded to the party requesting the Proposer information), and pay any and all costs a nd expenses related to the withholding of Proposer information. Proposer shall not make a claim, sue, or maintain any legal action against the City or its directors, officers, employees, or agents concerning the disclosure, or withholding from disclosure, of any Proposer information. If Proposer does not request that the City withhold from disclosure information identified as confidential, the City shall have no obligation to withhold the information from disclosure and may release the information sought w ithout any liability to the City.
9. Ex Parte Communications: Proposers and Proposers’ representatives should not communicate with the City Council members about this RFP. In addition, Proposers and Proposers’ representatives should not communicate outside the procedures set forth in this RFP with an officer, employee or agent of the City, including any member of the evaluation p anel, with the exception of the RFP Facilitator , regarding this RFP until after Contract Award.
Proposers and their representatives are not prohibited, however, from making oral statements or presentations in public to one or more representatives of the City during a public meeting.
A "Proposer" or "Proposer's representative" includes all of the Proposer's employees, officers, directors, consultants and agents, any subcontractors or suppliers listed in the Proposer's Proposal, and any individual or entity who has been requested by the Proposer to contact the 642
City on the Proposer's behalf. Proposers shall include the Ex Parte Communications Form in Appendix C with their Proposals certifying that they have not had or directed prohibited communications as described in this section.
10. Conflict of Interest: The Proposer warrants and represents th at it presently has no interest and agrees that it will not acquire any interest which would present a conflict of interest under California Government Code Sections 1090 , et seq., or Sections 87100 , et seq., during the performance of services under any Agreement awarded. The Proposer further covenants that it will not knowingly employ any person having such an interest in the performance of any Agreement awarded. Violation of this provision may resul t in any Agreement awarded being deemed void and unenforceable.
11. Disclosure of Governmental Position : In order to analyze possible conflicts that might prevent a Proposer from acting on behalf of the City, the City requires that all Proposers disclose in their Proposals any positions that they hold as directors, officers, or employees of any governmental entity. Additional disclosure may be required prior to contract award or during the term of the contract. Each Proposer shall disclose whether any owner or employee of the firm currently hold positions as elected or ap pointed officials, directors, officers, or employees of a governmental entity or held such positions in the past twelve months using the attached Disclosure of Government Positions Form in Appendix C.
12. Conditions to Agreement: The selected Proposer will execute a Professional Service s Agreement for Services with the City describing the Scope of Services to be performed, the schedule for completion of the services, compensation, and other pertinent provisions. The contract shall follow the sample form of Agreement provided as Appendix B to this RFP, which may be modified by the City.
All Proposers are directed to particularly review the indemnification and insurance requirements set forth in the sample A greement. The terms of the agreement, including insurance requirements have been mandated by the City and can be modified only if extraordinary circumstances exist.
Submittal of a Proposal shall be deemed acceptance of all the terms set fort h in this RFP and the sample agreement for services unless the Proposer includes with its Proposal, in writing, any conditions or exceptions requested by the Proposer to the proposed Agreement.
13. Disqualification Questionnaire: Proposers shall complete and submit, under penalty of perjury, a standard form of questionnaire inquiring whether a Proposer, any officer of a Proposer, or any employee of a Proposer who has a proprietary interest in the Proposer, has ever been disqualified, removed, or otherwise prevented from proposing on, or completing a federal, state, or local government project because of a violation of law or safety regulation and if so, to explain the circumstances. A Proposal may be rejected on the basis of a Prop oser, any officer or employee of such Proposer, having been disqualified, removed, or otherwise prevented from proposing on, or completing a federal, state, or local project because of a violation of law or a safety regulation, included in Appendix C.
643
14. Standard Terms and Conditions: The City reserves the right to amend or supplement this RFP prior to the Proposal due date. All addend a and additional information will be posted to www.Planetbids.com
644
14 [Contractor’s name]
Form Rev. 10-30-24
APPENDIX A
SCOPE OF WORK
645
15 [Contractor’s name]
Form Rev. 10-30-24
Stage 1 Enterprise Cabling CAT6a
Install a complete end-to-end certified system for transmission of voice, data, and video signals. The system shall be designed, installed, and tested to the proposed Category 6A specifications, certified to a 10 GB speed to the desktop.
Replace the obsolete CAT5 infrastructure with CAT6A Infrastructure at all sites.
Establishing new and enhancing existing cable pathways to facilitate both initial installation and future growth.
Installation and termination of Category-6A network cabling at identified drop locations
Provide a Labeling map, CAD & PDF documentation of installed cable plant.
Category-6A certification testing and test results.
Removal and demolition of pre-existing network cable and patch panels post-migration.
Expanding existing penetrations may be required to expand pathways in some locations.
A written warranty of work for a 10-year minimum is required.
Contractor is to be on site for consecutive days until work is completed.
PLANS AND SPECIFICATIONS
The City of Costa Mesa does not possess CAD drawings of the subject. Floor plans are available for review via PDF.
Approximately 1,500 jacks across 13 site locations have been identified for this project.
Bidders will be given the opportunity for a walk-through of the facilities prior to submitting their bids.
Responses must use components outlined for the solution that are equal to or exceed the specification to meet the objectives outlined.
The Contractor shall not place any distribution cabling alongside power lines, or share the same conduit, channel, or sleeve with electrical apparatus.
646
16 [Contractor’s name]
Form Rev. 10-30-24
The Contractor shall ensure that the maximum pulling tensions of the specified distribution cables are not exceeded, and cable bends maintain the proper radius during the placement of the facilities.
All modular furniture outlets must be integrated to ensure properly sized “in -feeds” and pathway capacity. All cables exiting a wall cavity or floor sleeve must be protected until the cables enter the furniture system. Any costs for scheduling offsets or come-backs for dressing the furniture must be included in base bid price.
The maximum run of cable from any workstation to an IDF closet, or to the MDF shall not exceed 290 linear feet with an allowance for patch cords. The overall length of the circuit (including patch cords) from desktop device to LAN equipment shall not exceed 328 feet (100 meters).
All data station cables shall terminate sequentially on termination panels where they will be patched with RJ-45 patch cables of appropriate length to the network switch.
All data station cables shall be terminated onto rack-mounted patch panels. Patch panels shall be flat modular patch panels.
The contractor shall provide all CAT6A patch cables required for completing Ethernet connections between the equipment patch panels and station patch panels. Provide one (1) patch cord of the appropriate size for each data cable installed. These patch cabl es shall be double ended RJ-45 TIA Category 6A cable.
No cabling will be permitted to be installed on ceiling or black iron. All cabling is to have an independent support system.
CABLING REQUIREMENTS
All network drops shall consist of Category-6A, white, plenum-rated cables, patch panels, and white jacks.
All network riser cables shall be AWG copper and white in color.
Cable distance shall not exceed 290 feet (88 meters).
A 6 foot service loop will be provided within 10 feet of each termination.
A minimum bend radius of 1-inch shall be respected for all cabling.
The maximum bundle size is 24 cables.
Cable bundles shall use Velcro fastening.
647
17 [Contractor’s name]
Form Rev. 10-30-24
Each drop will make use of a white keystone termination and appropriate faceplate.
Patch panels and keystones shall be Cat-6A rated.
Pathways will be serviceable and consist of conduit and appropriate grommet and firestop (if applicable) for any wall or floor penetration; cable tray or EMT conduit for any exposed cabling pathway; and appropriate J-hooks above drop ceiling.
Cabling shall not be laid on ceiling grid structure, ceiling tiles or supported on any structure not specifically designed for supporting cables. If a cable tray is not present, provide cable supports at intervals of every 4 – 6 feet.
Cable supports shall be “J” hooks or other supporting devices with a minimum 1 -inch cable-resting surface.
Cable support devices shall be independently suspended from or attached to building structure or walls. Cable sag between supports shall not exceed 12 inches.
LABELING AND DOCUMENTATION
A 4-character labeling scheme, referred to as “Jack ID” hereafter, shall be used for all network drops as follows:
A numerical digit 0-5 indicating the floor (example: 0 for basement, 1 for first floor, 2 for 2nd floor, etc.).
A two -digit numerical identifier representing the wall or biscuit box for the drop to correspond with the patch panel port.
A single letter, A – Z indicating the patch panel.
When a box provides multiple jacks, jacks are to be ordered left to right, top to bottom; like reading a book.
No punctuation shall be used.
Example identifiers: 101A, 101B, 201A, 201B.
For each cable the Jack ID shall appear using printed permanent labeling in 4 locations:
Each end of the cable within 1 feet of termination.
Above each patch panel port.
On the box or faceplate of the drop, once (e.g., 101A and 101B). 648
18 [Contractor’s name]
Form Rev. 10-30-24
Each office that requires two network drops will be paired with the same patch panels and ports identifier (example: 101A & 101B).
An as-built floor plan with drop locations will be provided in electronic form (CAD and PDF) must be given to the City before the job is completed.
COMPONENTS
24 or 48-port Category-6A TrendNet patch (Model TC-KP24S/ TC-KP48S) panels based on need; each patch panel will be spaced 1RU or equivalent.
TrendNet Keystone (Model TC-K06C6A) Jack systems or equivalent.
Cat6a cabling will be CommScope or equivalent.
RJ45 Jacks for Cat6a will be CommScope or equivalent.
Drops that are in the ceiling will be terminated in a surface mount box unless directly plugged into a POE Camera. POE Camera will require a direct RJ45 connection.
CommScope or equivalent, depending on need.
COPPER 6A TESTING
All category 6A field -testing shall be performed with a Fluke Networks DTX -1800 tester or better.
Category 6A balanced twisted -pair horizontal and backbone cables, whose length does not exceed 90 m eters (295 feet) for the basic link, and 100 m eters (328 feet) for the channel shall be 100 percent tested according to ANSI/TIA/EIA-568-B.1. Test parameters include wire map plus ScTP shield continuity (when present), length, NEXT loss (pair-to- pair), NEXT loss (power sum), ELFEXT loss (pair -to-pair), ELFEXT loss (power sum), return loss, insertion loss, propagation delay, and delay skew.
TEST EQUIPMENT CRITERIA
All balanced twisted -pair field testers shall be factory calibrated each calendar year by the field test equipment manufacturer as stipulated by the manuals provided with the field test unit. The calibration certificate shall be provided for review prior to the start of testing.
Automatic test settings provided in the field tester for testing the installed cabling shall be set to the default parameters.
649
19 [Contractor’s name]
Form Rev. 10-30-24
Test settings selected from options provided in the field testers shall be compatible with the installed cable under test.
Test results will be labeled using the Jack ID and provided as a single report.
Test results will include a pass -fail summary followed by detailed test results for each Jack ID.
SYSTEM WARRANTY
A ten (10) year or greater warranty available for the category 6A structured cabling system shall be provided for an end -to-end channel model installation which covers cable, connecting hardware and the labor cost for the repair or replacement thereof.
LOCATIONS
# NAME TYPE ADDRESS # of Drops(approx.)
1. City Hall City Facility 77 Fair Dr 700
2. Corporation Yard City Facility 2310 Placentia Ave 96
3. Neighborhood Community Community Ctr 1845 Park Ave 48
4. Downtown Recreation Ctr Community Ctr 1860 Anaheim Ave 96
5. Senior Center Community Ctr 695 W 19th St 96
6. Fire Station 2 Fire Department 800 W Baker St 24
7. Fire Station 3 Fire Department 1865 Park Ave 24
8. Fire Station 4 Fire Department 2300 Placentia Ave 24
9. Fire Station 5 Fire Department 2450 Vanguard Way 24
10. Fire Station 6 Fire Department 3350 Sakioka Dr 24
11. Communications PD 79 Fair Dr 128
12. Westside Substation PD 565 W 18th St 48
13. South Coast Plaza Sub PD 3333 Bristol St 24
Note: Approximately 1,3 56 network drops but quote for 1500 Network connections in totality.
Stage 2 Verkada Camera Install CAT6 enhanced
Install a complete end-to-end certified system for transmission of voice, data, and video signals for the Police Department. The system shall be designed, installed, and tested to the proposed Category 6 (Cat6) Enhanced specifications, and certified to a 1 GB speed to the Power over Ethernet (PoE) Verkada IP Cameras.
Contractor will provide thirty-five (35) Cat6 Enhanced cable for 32 Verkada Cloud Cameras and 3 Viewing Stations. Terminate, certification test, and label each cable.
650
20 [Contractor’s name]
Form Rev. 10-30-24
Normal business hours are 8:00 a.m. to 5:00 p.m., Monday – Thursday, and every other Friday. After hours work will be required for at least 50% of the total hours.
Contractor will provide new conduit where required. Conduit is to be painted to match existing interior/exterior colors. It is assumed that all the existing conduit raceways for each of the exterior and interior cabling pathways will be reusable to pull the existing cabling out of the conduit and pull the new cable in without additional conduit required.
Contractor will furnish PoE and Network Extenders for Verkada Cameras if required.
Replace the obsolete Cat5/coax infrastructure with Cat6 Enhanced Infrastructure for the Verkada Camera Installation.
Establishing new and enhancing existing cable pathways to facilitate initial installation and future growth.
Installation and termination of Cat6 Enhanced network cabling at identified drop locations.
Labeling map, CAD, and PDF documentation of installed cable plant.
Cat6 Enhanced certification testing and test results.
Removal and demolition of pre-existing network cable and patch panels post-migration.
Expanding existing penetrations may be required to expand pathways in some areas.
A written warranty of work for a 10-year minimum is required.
Contractor is to be on-site for consecutive days until work is completed.
Contractor to point and tilt Verkada camera with final views being approved by City team.
Access to Verkada Command application will be provided to Contractor for initial views of cameras.
CAMERA LOCATIONS
NAME ADDRESS # of Drops
Police Department 79 Fair Drive, Costa Mesa CA 92626 35 A. Map will be provided by the City.
B. Interior camera locations for the Police Station and the Communications Building with Verkada 60-day retention cameras:
1. Main visitor lobby
2. Lobby behind counter
3. Lobby door (eye level)
4. Lobby hallway/restrooms
5. Property entry
651
21 [Contractor’s name]
Form Rev. 10-30-24
6. Safe room C1
7. Safe room C2
8. Gun storage
9. Front desk/package hallway
10. Northeast hallway around jail by break room patio door
11. Room next to the patio door
C. Exterior camera locations for the Police Station and Communications Building.
Exterior areas with Verkada 60-day retention cameras:
12. Front lobby entrance
13. North visitor parking lot
14. North visitor entrance (LPR Mode)
15. Front walkway outside of the main entrance
16. Front walkway outside of Property
17. Front northeast corner walkway
18. Northeast pedestrian gate
19. East vehicle gate
20. Communications parking lot
21. Back of Communications building
22. Southwest corner of Communications building
23. Northwest corner of Communications building
24. Communications north entry door (by phone)
25. Southwest vehicle gate
26. East parking pedestrian gate
27. East parking northeast helicopter pad
28. Crime scene evidence door
29. Northwest parking area helicopter pad
30. Northwest parking area southwest entry
31. Northwest vehicle gate
32. West entrance
D. View Station Locations:
33. Watch Commander# 1 – 1 New View Station with 1 new 43" Displays and Ceiling Hung Mounts
34. Watch Commander# 2 – 1 New View Station with 1 new 43" Displays and Ceiling Hung Mounts
35. Communications – 1 New View Station with 1 New 75" Display and Wall or Ceiling Mount
PLANS AND SPECIFICATIONS
The City of Costa Mesa does not possess CAD drawings of the existing infrastructure.
Floor plans are available for review via PDF.
Approximately 35 jacks in the Police Department have been identified for this project. 652
22 [Contractor’s name]
Form Rev. 10-30-24
Proposers will be given the opportunity for a walk-through of the facility prior to submitting their proposals.
Responses must use the listed components (or equivalent) for the solution to meet the objectives outlined.
Contractor shall ensure that the maximum pulling tensions of the specified distribution cables are not exceeded and cable bends maintain the proper radius during the placement of the facilities.
All cables exiting a wall cavity or floor sleeve must be protected until the cables enter the furniture system. Any exterior conduit run must be outdoor -rated metal and painted to match the building. Any costs for scheduling, painting, offsets, or come-backs for dressing the installation must be included in the base proposed price.
The maximum run of cable from any workstation to an IDF closet, or to the MDF shall not exceed 290 linear feet with an allowance for patch cords. The overall length of the circuit (including patch cords) from desktop device to LAN equipment shall not exceed 100 meters (328 feet).
All data station cables shall terminate sequentially on termination panels where they will be patched with RJ-45 patch cables of appropriate length to the network switch.
All data station cables shall be terminated onto rack-mounted patch panels. Patch panels shall be flat modular patch panels.
Contractor shall provide all Cat6 Enhanced patch cables required for completing Ethernet connections between the equipment patch panels and station patch panels.
No cabling will be permitted to be installed on ceiling or black iron. All cabling is to have an independent support system.
CABLING REQUIREMENTS
All network drops shall consist of Cat6 Enhanced, orange plenum rated cables, patch panels, and yellow jacks.
All network riser cable shall be AWG copper and yellow in color.
Cable distance shall not exceed 288 feet (88 meters).
A 6-foot service loop will be provided within 10 feet of each termination.
A minimum bend radius of 1-inch shall be respected for all cabling.
653
23 [Contractor’s name]
Form Rev. 10-30-24
The maximum bundle size is 24 cables
Cable bundles shall use Velcro fasteners.
Patch panels and keystones shall be Cat6 Enhanced rated.
Pathways will be serviceable and consist of conduit and appropriate grommet and firestop (if applicable) for any wall or floor penetration; cable tray or EMT conduit for any exposed cabling pathway; and appropriate J-hooks above drop ceiling.
Cabling shall not be laid on ceiling grid structure, ceiling tiles, or supported on any structure not specifically designed for supporting cables. If a cable tray is not present, provide cable supports at intervals of every 4 – 6 feet.
Contractor shall not place any distribution cabling alongside power lines, or share the same conduit, channel, or sleeve with electrical apparatus.
Cable supports shall be J-hook or other supporting devices with a minimum 1-inch cable- resting surface.
Cable support devices shall be independently suspended from or attached to building structure or walls. Cable sag between supports shall not exceed 12 inches.
Stage 3: Single Mode Campus Fiber
Contractor will provide Fifteen (15) Single mode Campus Fiber Optic Backbone Cables based on the preexisting locations, utilizing the building ceiling spaces and existing conduits/sleeves between each floor and building.
Contractor will provide demo of the existing Multimode Fiber Cables after City of Costa Mesa has cut over all existing network connection to the new fiber Optic cables.
The fiber pathways will include a 1" Innerduct for all ceiling and ladder rack pathways where Armored Fiber cabling is not used.
All fiber will be terminated into Rack or Wall Mounted Fiber Cabinets as applicable, with LC Duplex Coupler Panels and LC Fusion Splice Pigtails.
Contractor will provide all Fiber Optic Patch Cables to enable all fiber point to point connections.
Contractor will provide and install fusion splice cassettes at all termination points.
The following 15 campus fiber backbones have been requested located at 77, 79 & 99 Fair Drive & 2450 Vanguard Way, Costa Mesa, CA 92626:
654
24 [Contractor’s name]
Form Rev. 10-30-24
City Hall Server Room
1. 24Fiber CH Server Rm/CH Net Rack – to – CH Server Rm/PD Server Cabinet
2. 24Fiber CH Server Rm/PD Net Rack – to – CH Server Rm/PD Server Cabinet
City Hall IDFs
3.12Fiber CH Server Rm/CH Net Rack – to – CH Basement IDF
4. 12Fiber CH Server Rm/CH Net Rack – to – CH 1st Floor Video Rm IDF
5.12Fiber CH Server Rm/CH Net Rack – to – CH 2nd Floor IDF
6.12Fiber CH Server Rm/CH Net Rack – to – CH 3rd Floor IDF
7.12Fiber CH Server Rm/CH Net Rack – to – CH 4th Floor IDF
8.12Fiber CH Server Rm/CH Net Rack – to – CH 5th Floor IDF
Campus Interconnect Outdoor Fiber Cables
9. 24Fiber CH Server Rm/PD Net Rack – to – Communications Building
10. 12Fiber Communications Building – to – Fire Station #5
11. 12Fiber CH Server Rm/CH Net Rack – to – PD Fuel Pump Shack Wall Mount a. Fuel Pump 1” conduit will need to be surveyed, to assure new fiber will be able to be pull into the existing conduit.
12.12Fiber CH Server Rm/CH Net Rack – to – PD Helicopter Pad Wall Mount
Police Department
13.12 Fiber PD Basement – to – PD 1st Floor IDF
14.12 Fiber PD Basement – to – PD 2nd Floor IDF
15. 12 Fiber PD Basement – to – PD 1st Floor EOC IDF
Stage 4 EOC IDF Rack relocation and re-termination of new connections
Contractor will remove fiber enclosures and pull fiber back to new IDF location.
Contractor will remove copper cables from patch panels and pull cables back to new IDF location.
Contractor will remove IDF rack and relocate to new IDF location.
Contractor will remove ladder racking and reuse as necessary for new location.
Contractor will install ladder rack, fiber enclosures, copper patch panels onto IDF rack.
Contractor will dress and load fiber into fiber enclosures.
Contractor will re-terminate and retest all copper & fiber cables on to existing panels.
Contractor will provide and Install 80 new Cat6a cables that won’t reach from previous IDF location to new IDF location.
Contractor will provide Cat6a patch panels and keystones as needed Contractor will provide 80 Cat6a network patch cables
Contractor will terminate test and label newly install Cat6a cables.
655
25 [Contractor’s name]
Form Rev. 10-30-24
LABELING AND DOCUMENTATION
A 4-character labeling scheme (Jack ID) shall be used for all network drops as follows:
A numerical digit 0 – 5 indicating the floor (i.e., 0 for basement, 1 for first floor, 2 for second floor, etc.).
A two -digit numerical identifier representing the wall or biscuit box for the drop to correspond with the patch panel port.
A single letter A – Z indicating the patch panel.
When a box provides multiple jacks, they are to be ordered left to right, top to bottom.
No punctuation shall be used.
Example identifiers: 101A, 101B, 201A, 201B.
For each cable, the Jack ID shall appear using printed permanent labeling in 4 locations:
Each end of the cable within 1 foot of termination;
Above each patch panel port;
On the box or faceplate of the drop, once (i.e., 101A and 101B).
An as-built floor plan with drop locations will be provided in electronic form (CAD and PDF) to the City before the job is completed.
COMPONENTS
24-port or 48-port Cat6 TrendNet patch (Model TC-KP24S/ TC-KP48S) panels based on need; each patch panel will be spaced 1RU.
TrendNet Keystone Yellow Jack systems or equivalent.
Cat6 Enhanced cabling will be CommScope or equivalent.
RJ45 Jacks for Cat6 will be CommScope or equivalent.
PoE camera will require a direct RJ45 connection, CommScope, or equivalent.
Corning fiber connections, fiber, splice cassette, housing panels, etc., or equivalent.
2 new Samsung 43” Commercial 24X7 TV Monitors & Mount
1 new Samsung 75” Commercial 24X7 TV Monitor & mounts
656
26 [Contractor’s name]
Form Rev. 10-30-24
COPPER 6 TESTING
All Cat6 Enhanced field-testing shall be performed with a Fluke Networks DTX -1800 tester or better.
Cat6 balanced twisted -pair horizontal and backbone cables, whose length does not exceed 90 meters (295 feet) for the basic link, and 100 meters (328 feet) for the channel shall be 100 percent tested according to ANSI/TIA/EIA-568-B.1. Test parameters include wire map plus ScTP shield continuity (when present), length, NEXT loss (pair -to-pair), NEXT loss (power sum), ELFEXT loss (pair -to-pair), ELFEXT loss (power sum), return loss, insertion loss, propagation delay, and delay skew.
TEST EQUIPMENT CRITERIA
All balanced twisted -pair field testers shall be factory calibrated each calendar year by the field test equipment manufacturer as stipulated by the manuals provided with the field test unit. The calibration certificate shall be provided for review prior to the start of testing.
Automatic test settings provided in the field tester for testing the installed cabling shall be set to the default parameters.
Test settings selected from options provided in the field testers shall be compatible with the installed cable under test.
Test results will be labeled using the Jack ID and provided as a single report.
Test results will include a Pass/Fail summary followed b y detailed test results for each Jack ID.
SYSTEM WARRANTY
A ten (10) year or greater warranty available for the Cat6 structured cabling system shall be provided for an end-to-end channel model installation which covers cable, connecting hardware, and the labor cost for the repair or replacement thereof.
657
40 [Contractor’s name]
Form Rev. 10-30-24
APPENDIX C
FORMS
Vendor Application Form
Ex Parte Communications Certification
Disclosure of Government Positions
Disqualification Questionnaire
Company Profile & References
Bidder/Applicant/Contractor Campaign Contribution
Cost Proposal
658
1 BCS Consultants, Inc.
Form Rev. 07-07-2025
CITY OF COSTA MESA
INSTALLATION & MAINTENANCE SERVICES AGREEMENT
WITH
BCS CONSULTANTS, INC.
TH
IS MAINTENANCE SERVICES AGREEMENT (“Agreement”) is made and entered into this 4th day of August, 2025 (“Effective Date”), by and between the CITY OF COSTA MESA, a municipal corporation (“City”), and BCS CONSULTANTS, INC. , a California corporation (“Contractor”).
W
I T N E S S E T H :
A. C
ity proposes to utilize the services of Contractor as an independent contractor to pr
ovide maintenance of City property, as more fully described herein; and B. C
ontractor represents that it has the experience and expertise to properly perform such services and holds all necessary licenses to practice and perform the services; and C. C
ity and Contractor desire to contract for the services and desire to set forth their rights, duties and liabilities in connection with the performance of such services; and D. No offi
cial or employee of City has a financial interest, within the provisions of S
ections 1090-1092 of the California Government Code, in the subject matter of this Agreement.
N
OW, THEREFORE, for and in consideration of the mutual covenants and conditions contained herein, the parties hereby agree as follows:
1.0. SERVICES PROVIDED BY CONTRACTOR
1.1. Scope of Services. Contractor shall provide the services described in the City ’s Request for Proposal , RFP 25-05 (“RFP”), attached hereto as Exhibit “A ,” and Contractor’s response to City’s RFP (the “Proposal”) attached hereto as Exhibit “B,” both incorporated herein (the “Services”).
1.2. Prevailing Wage Requirements.
(a
) Prevailing Wage Laws. Contractor is aware of the requirements of Chapter 1 (beginning at Section 1720 et seq.) of Part 7 of Division 2 of the California Labor Code, as well as Title 8, Section 16000 et seq. of the California Code of R
egulations (“Prevailing Wage Laws”), which require the paym ent of pr
evailing wage rates and the performance of other requirements on “public works” and “maintenance” projects. This project is a “maintenance” project and requires compliance with the Prevailing Wage Laws. Contractor shall defend, indemnify and hold the City, its elected officials, officers, employees and agents free and harmless from any claim or liability arising out of any failure or alleged failure to comply with the Prevailing Wa ge Law
s.
(b
) Payment of Prevailing Wages. Contractor shall pay the prevailing w age rates for all work performed under this Agreement. When any craft or ATTACHMENT 2
659
2 BCS Consultants, Inc.
Form Rev. 07-07-2025
classification is omitted from the general prevailing wage determinations, Contractor shall pay the wage rate of the craft or classification most closely related to the omitted classification. A copy of the general prevailing wage rate determination is on file in the Office of the City Clerk and is incorporated into this Agreement as if fully set forth herein. Contractor shall post a copy of such wage rates at all times at the project site(s).
(c) Legal Working Day . In accordance with the provisions of Labor Code Section 1810 et seq., eight (8) hours is the legal working day. Contractor and any subcontractor(s) of Contractor shall comply with the provisions of the Labor Code regarding eight (8)-hour work day and 40-hour work week requirements, and overtime, Saturday, Sunday, and holiday work. Work performed by Contractor’s or any subcontractor’s employees in excess of eight (8) hours per day, and 40 hours during any one week, must include compensation for all hours worked in excess of eight (8) hours per day, or 40 hours during any one week, at not less than one and one-half times the basic rate of pay. Contractor shall forfeit as a penalty to City Twenty -Five Dollars ($25.00), or any greater penalty set forth in the Labor Code, for each worker employed in the execution of the work by Contractor or by any subcontractor(s) of Contractor, for each calendar day during which such worker is required or permitted to the work more than eight (8) hours in one calendar day or more than 40 hours in any one calendar week in violation of the Labor Code.
(d) Apprentices. Contractor shall comply with the provisions of Labor Code Section 1777.5 concerning the employment of apprentices on public works projects. Contractor shall be responsible for ensuring compliance by its subcontractors with Labor Code Section 1777.5.
(e) Payroll Records . Pursuant to Labor Code Section 1776, Contractor and any subcontractor(s) shall keep accurate payroll records, showing the name, address, social security number, work classification, straight time and overtime hours worked each day and week, and the actual per diem wages paid to each journeyman, apprentice, worker, or other employee employed by Contractor or any subcontractor in connection with this Agreement. Each payroll record shall contain or be verified by a written declaration that it is made under penalty of perjury, stating both of the following: (1) The information contained in the payroll record is true and correct; and (2) The employer has complied with the requirements of Sections 1771, 1881, and 1815 of the Labor Code for any work performed by his or her employees on this project. The payroll records shall be certified and shall be available for inspection at all reasonable hours in accordance with the requirements of Labor Code Section 1776.
(f) Registration with DIR . Contractor and any subcontractor(s) of Contractor shall comply with the provisions of Labor Code Section 1771 and Labor Code Section 1725.5 requiring registration with the DIR.
1.3. Performance to Satisfaction of City . Contractor agrees to perform all the work to the complete satisfaction of City. Evaluations of the wor k will be done by City’s Maintenance Services Manager or his or her designee. If the quality of work is not satisfactory, City in its 660
3 BCS Consultants, Inc.
Form Rev. 07-07-2025
discretion has the right to:
(a) Meet with Contractor to review the quality of the work and resolve the matters of concern;
(b) Require Contractor to repeat the work at no additional fee until it is satisfactory; and/or
(c) Terminate the Agreement as hereinafter set forth.
1.4. Compliance with Applicable Law . Contractor warrants that it shall perform the services required by this Agreement in compliance with all applicable Federal and California employment laws, including, but not limited to, those laws related to harassment, workplace violence, discrimination, minimum hours and wages; occupational health and safety; fair employment and employment practices; workers’ compensation insurance and safety in employment; and all other Federal, State and local laws and ordinances applicable to the services required under this Agreement. Contractor shall indemnify and hold harmless City from and against all claims, demands, payments, suits, actions, proceedings, and judgments of every nature and description including attorneys’ fees and costs, presented, brought, or recovered against City for, or on account of any liability under any of the above-mentioned laws, which may be incurred by reason of Contractor’s performance under this Agreement.
1.5. Non-Discrimination. In performing this Agreement, Contractor shall not engage in, nor permit its agents to engage in, discrimination in employment of persons because of their race, religious creed, color, national origin, ancestry, physical disability, mental disability, medical condition, genetic information, mari tal status, sex, gender, gender identity, gender expression, age, sexual orientation, or military or veteran status, except as permitted pursuant to section 12940 of the Government Code.
1.6. Non-Exclusive Agreement. Contractor acknowledges that City may enter into agreements with other contractors for services similar to the S ervices in this Agreement or may have its own employees per form services similar to those S ervices contemplated by this Agreement.
1.7. Delegation and Assignment. Contractor may not delegate or assign this Agreement, in whole or in part, to any person or entity without the prior written consent of City.
Contractor may engage a subcontractor(s) as permitted by law and may employ other personnel to perform services contemplated by this Agreement at Contractor’s sole cost and expense.
1.8. Confidentiality. Employees of Consultant in the course of their duties may have access to financial, accounting, statistical, and personnel data of private individuals and employees of City, or confidential information relating to the City’s computer and security systems and programs. Consultant covenants that all data, documents, discussion, or other information developed or received by Consultant or provided for performance of this Agreement are deemed confidential and shall not be disclosed by Consultant without written authorization by City. City shall grant such authorization if disclosure is required by law. All City data shall be returned to City upon the termination of this Agreement. Consultant’s covenant under this Section shall survive the termination of this Agreement.
2.0. COMPENSATION AND BILLING
661
4 BCS Consultants, Inc.
Form Rev. 07-07-2025
2.1. Compensation. Contractor shall be paid in accordance with the fee sc hedule set forth in Exhibit C . Contractor’s total compensation shall not exceed Seven Hundred Forty Thousand Six Hundred Eighty Three Dollars and Fifty One Cents ($740,683.51).
2.2. Additional Services. Contractor shall not receive compensation for any services provided outside the Scope of Services set forth in this Agreement without amending this Agreement as provided herein. It is specifically understood that oral requests and/or approvals of such additional services or additional compensation shall be barred and are unenforceable.
2.3. Method of Billing. Contractor may submit invoices to the City for approval on a progress basis, but no more often than two times a month. Said invoice shall be based on the total of all Contractor’s services which have been completed to City’s sole satisfaction. City shall pay Contractor’s invoice within forty-five (45) days from the date City receives said invoice. Each invoice shall describe in detail, the S ervices performed, the date of performance, and the associated time for completion.
2.4. Records and Audits . Records of Contractor ’s S ervices shall be maintained in accordance with generally recognized accounting principles and shall be made available to City for inspection and/or audit at mutual ly convenient times throughout the term of this Agreement through three (3) years after its termination.
3.0. TIME OF PERFORMANCE
3.1. Commencement and Completion of Work . The S ervices shall be performed in strict compliance with Exhibits A and B. Failure to commence work in a timely manner and/or diligently pursue work to completion may be grounds for termination of this Agreement.
3.2. Excusable Delays . Neither party shall be responsible for delays or lack of performance resulting from acts beyond the reasonable control of the party or parties. Such acts shall include, but not be limited to, acts of God, fire, strikes, material shortages, compliance w ith laws or regulations, riots, acts of war, pandemics (excluding COVID -19) or any other conditions beyond the reasonable control of a party.
4.0. TERM AND TERMINATION
4.1. Term. This Agreement shall commence on the Effective Date and continue for a period of 2 years, ending on August 3, 2027, unless previously terminated as provided herein or as otherwise agreed to in writing by the parties. This agreement may be extended by one (1) additional one (1) year period upon mutual agreement of both parties.
4.2. Notice of Termination. City reserves and has the right and privilege of canceling, suspending or abandoning the execution of all or any part of the work contemplated by this Agreement, with or without cause, at any time, by providing written notice to Contractor . The termination of this Agreement shall be deemed effective upon receipt of the notice of termination.
In the event of such termination, Contractor shall immediately stop rendering services under this Agreement unless directed otherwise by the City.
4.3. Compensation. In the event of termination, City shall pay Contractor for reasonable costs incurred and S ervices satisfactorily performed up to and including the date of City’s written notice of termination. Compensation for work in progress shall be prorated based 662
5 BCS Consultants, Inc.
Form Rev. 07-07-2025
on the percentage of work completed as of the effective date of termination in accordance with the fees set forth herein.
5.0. INSURANCE
5.1. Minimum Scope and Limits of Insurance. Contractor shall obtain, maintain, and keep in full force and effect during the life of this Agreement all of the following minimum scope of insurance coverages with an insurance company admitted to do business in California, rated “A,” Class X, or better in the most recent Best’ s Key Insurance Rating Guide, and approved by City:
(a) Commercial general liability, including premises -operations, products/completed operations, broad form property damage, blanket contractual liability, independent contractors, personal injury or bodily injury with a policy limit of not less than One Million Dollars ($1,000,000.00) per occurrence. If such insurance contains a general aggregate limit, it shall apply separately to this Agreement or shall be twice the required occurrence limit.
(b) Business a utomobile liability for owned vehicles, hired, and non-owned vehicles, with a policy limit of not less than One Million Dollars ($1,000,000.00) combined single limit per accident for bodily injury and property damage.
(c) Workers’ compensation insurance as required by the State of California.
Contractor agrees to waive, and to obtain endorsements from its workers ’ compensation insurer waiving subrogation rights under its workers ’ compensation insurance policy against the City , its officers, agents, employees, and volunteers arising from work performed by Contractor for the City and to require each of its subcontractors, if any, to do likewise under their workers’ compensation insurance policies.
5.2. Endorsements. The commercial general liability insurance policy and business automobile liability policy shall contain or be endorsed to contain the following provisions:
(a) Additional insureds: “The City of Costa Mesa and its elected and appointed boards, officers, officials, agents, employees, and volunteers are additional insureds with respect to: liability arising out of activities performed by or on behalf of Contractor pursuant to its contract with City; products and completed operations of Contractor; premises owned, occupied or used by Contractor; automobiles owned, leased, hired, or borrowed by Contractor.”
(b) Notice: “Said policy shall not terminate, be suspended, or voided, nor shall it be cancelled, nor the coverage or limits reduced, until thirty (30) days after written notice is given to City.”
(c) Other insurance: “ Contractor’s insurance coverage shall be primary insurance as respects the City of Costa Mesa, its officers, officials, agents, employees, and volunteers. Any other insurance maintained by the City of Costa Mesa shall be excess and not contributing with the ins urance provided by this policy.”
663
6 BCS Consultants, Inc.
Form Rev. 07-07-2025
(d) Any failure to comply with the reporting provisions of the policies shall not affect coverage provided to the City of Costa Mesa, its officers, officials, agents, employees, and volunteers.
(e) Contractor’s insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the limits of the insurer’s liability.
5.3. Deductible or Self Insured Retention. If any of such policies provide for a deductible or self-insured retention to provide such coverage, the amount of such deductible or self-insured retention shall be approved in advance by City. No policy of insurance issued as to which the City is an addi tional insured shall contain a provision which requires that no insured except the named insured can satisfy any such deductible or self-insured retention.
5.4. Certificates of Insurance. Contractor shall provide to City certificates of insurance showing the insurance coverages and required endorsements described above, in a form and content approved by City, prior to performing any services under this Agreement.
5.5. Non-limiting. The insurance provisions contained in this Agreement shall not be construed as limiting in any way, the indemnification provisions contained in this Agreement, or the extent to which Contractor may be held responsible for payments of damages to persons or property.
5.6. Excess Coverage . To the extent that Contractor maintains any insurance coverage(s) in amounts or types which are not expressly called out in this Agreement, such additional coverage(s) shall be deemed to be required by this Agreement.
6.0. GENERAL PROVISIONS
6.1. Entire Agreement. This Agreement constitutes the entire agreement between the parties with respect to any matter referenced herein and supersedes any and all other prior writings and oral negotiations. This Agreement may be modified only in writing, and signed by the parties in interest at the time of such modification. The terms of this Agreement shall prevail over any inconsistent provision in any other contract document appurtenant hereto, including exhibits to this Agreement.
6.2. Representatives. The C ity Manager or his or her designee shall be the representative of City for purposes of this Agreement and may issue all consents, approvals, directives and agreements on behalf of the City, called for by this Agreement, except as otherwise expressly provided in this Agreement.
Contractor shall designate a representative for purposes of this Agreement who shall be authorized to issue all consents, approvals, directives and agreements on behalf of Contractor called for by this Agreement, except as otherwise expressly provided in this Agreement.
6.3. Project Managers. City shall designate a Project Manager to work directly with Contractor in the performance of this Agreement.
664
7 BCS Consultants, Inc.
Form Rev. 07-07-2025
Contractor shall designate a Project Manager who shall represent it and be its agent in all consultations with City during the term of this Agreement. Contractor or its Project Manager shall attend and assist in all coordination meetings called by City.
6.4. Notices. Any notices, documents, correspondence or other communications concerning this Agreement or the work hereunder may be provided by personal delivery, facsimile or mail and shall be addressed as set forth below. Such communication shall be deemed served or delivered: a) at the time of delivery if such communication is sent by personal delivery; b) at the time of transmission if such communication is sent by facsimile; and c) 48 hours after deposit in the U.S. Mail as reflected by the official U.S. postmark if such communication is sent through regular United States mail.
IF TO CONTRACTOR: IF TO CITY:
BCS Consultants, Inc.
9910 Irvine Center Drive
Irvine, CA 92618
City of Costa Mesa
77 Fair Drive
Costa Mesa, CA 92626
Tel: (949) 333-1000 Tel: (714) 754-4837
Attn: Sunny Rajab, CEO Attn: Rupsi Burman
Courtesy copy to:
City of Costa Mesa
77 Fair Drive
Costa Mesa, CA 92626
Attn: Finance Dept. | Purchasing
6.5. Drug-Free Workplace Policy . Contractor shall provide a drug-free workplace by complying with all provisions set forth in City ’s Council Policy 100-5, attached hereto as Exhibit “C” and incorporated herein by reference. Contractor’s failure to conform to the requirements set forth in Council Policy 100-5 shall constitute a material breach of this Agreement and shall be cause for immediate termination of this Agreement by City.
6.6. Attorneys’ Fees. In the event that litigation is brought by any party in connection with this Agreement, the prevailing party shall be entitled to recover from the opposing party all costs and expenses, including reasonable attorneys ’ fees, incurred by the prevailing party in the exercise of any of its rights or remedies hereunder or the enforcement of any of the terms, conditions, or provisions hereof.
6.7. Governing Law. This Agreement shall be governed by and construed under the laws of the State of California without giving effect to that body of laws pertaining to conflict of laws. In the event of any legal action to enforce or interpret this Agreement, the parties hereto agree that the sole and exclusive venue shall be a court of competent jurisdiction located in Orange County, California.
6.8. Assignment. Contractor shall not voluntarily or by operation of law assign, transfer, sublet or encumber all or any part of Contractor’s interest in this Agreement without City ’s prior written consent. Any attempted assignment, transfer, subletting or encumbrance shall be void and shall constitute a breach of this Agreement and cause for termination of this Agreement.
Regardless of City’s consent, no subletting or assignment shall release Contractor of Contractor’s obligation to perform all other obligations to be performed by C ontractor hereunder for the term 665
8 BCS Consultants, Inc.
Form Rev. 07-07-2025
of this Agreement.
6.9. Indemnification and Hold Harmless. Contractor agrees to defend, indemnify, hold free and harmless the City, its elected officials, officers, agents and employees, at Contractor’s sole expense, from and against any and all claims, actions, suits or other legal proceedings brought against the City, its elected officials, officers, agents and employees arising out of the performance of the Contractor , its employees, and/or authorized subcontractors, of the work undertaken pursuant to this Agreement. The defense obligation provided for hereunder shall apply without any advance showing of negligence or wrongdoing by the Contractor , its employees, and/or authorized subcontractors, but shall be required whenever any claim, action, complaint, or suit asserts as its basis the negligence, errors, omissions or misconduct of the Contractor , its employees, and/or authorized subcontractors, and/or whenever any claim, action, complaint or suit asserts liability against the City, its elected officials, officers, agents and employees based upon the work performed by the Contractor , its employees, and/or authorized subcontractors under this Agreement, whether or not the Contractor, its employees, and/or authorized subcontractors are specifically named or otherwise asserted to be liable. Notwithstanding the foregoing, the Contractor shall not be liable for the defense or indemnification of the City for claims, actions, complaints or suits arising out of the sole active negligence or willful misconduct of the City. This provision shall supersede and replace all other indemnity provisi ons contained either in the City’s specifications or Contractor’s Proposal, which shall be of no force and effect.
6.10. Independent Contractor . Contractor is and shall be acting at all times as an independent contractor and not as an employee of City. Contractor shall have no power to incur any debt, obligation, or liability on behalf of City or otherwise act on behalf of City as an agent.
Neither City nor any of its agents shall have control over the conduct of Contractor or any of Contractor’s employees, except as set forth in this Agreement. Contractor shall not, at any time, or in any manner, represent that it or any of its or employees are in any manner agents or employees of City. Contractor shall secure, at its sole expense, and be responsible for any and all payment of Income Tax, Social Security, State Disability Insurance Compensation, Unemployment Compensation, and other payroll deductions for Contractor and its officers, agents, and employees, and all business licenses, if any are required, in connection with the services to be performed hereunder. Contractor shall indemnify and hold City harmless from any and all taxes, assessments, penalties, and interest asserted against City by reason of the independent contractor relationship created by this Agreement. Contractor further agrees to indemnify and hold City harmless from any failure of Contractor to comply with the applicable worker’s compensation laws. City shall have the right to offset against the amount of any fees due to Contractor under this Agreement any amount due to City from Contractor as a result of Contractor’s failure to promptly pay to City any reimbursement or indemnification arising under this paragraph.
6.11. PERS Eligibility Indemnification. In the event that Contractor or any employee, agent, or subcontractor of Contractor providing services under this Agreement claims or is determined by a court of competent jurisdiction or the California Public Employees Retirement System (PERS) to be eligible for enrollment in PERS as an employee of the City, Contractor shall indemnify, defend, and hold harmless City for the payment of any employee and/or employer contributions for PERS benefits on behalf of Contractor or its employees, agents, or subcontractors, as well as for the payment of any penalties and interest on such contributions, which would otherwise be the responsibility of City.
Notwithstanding any other agency, state or federal policy, rule, regulation, law or ordinance to the contrary, Contractor and any of its employees, agents, and subcontractors 666
9 BCS Consultants, Inc.
Form Rev. 07-07-2025
providing service under this Agreement shall not qualify for or become entitled to, and hereby agree to waive any claims to, any compensation, benefit, or any incident of employment by City, including but not limited to eligibility to enroll in PERS as an employee of City and entitlement to any contribution to be paid by City for employer contribution and/or employee contributions for PERS benefits.
6.12. Cooperation. In the event any claim or action is brought against City relating to Contractor’s performance or services rendered under this Agreement, Contractor shall render any reasonable assistance and cooperation which City might require.
6.13. Conflict of Interest. Contractor and its officers, employees, associates and subcontractors, if any, will comply with all conflict of interest statutes of the State of California applicable to Contractor’s services under this Agreement, including, but not limited to, the Political Reform Act (Government Code Sections 81000, et seq.) and Government Code Section 1090.
During the term of this Agreement, Contractor and its officers, employees, associates and subcontractors shall not, without the prior written approval of the City Representative, perform work for another person or entity for whom Contractor is not currently performing work that would require Contractor or one of its officers, employees, associates or subcontractors to abstain from a decision under this Agreement pursuant to a conflict of interest statute.
6.14. Prohibited Employment. Contractor will not employ any regular employee of City while this Agreement is in effect.
6.15. Order of Precedence. In the event of an inconsistency in this Agreement and any of the attached Exhibits, the terms set forth in this Agreement shall prevail . If, and to the extent this Agreement incorporates by reference any provision of any document, such provision shall be deemed a part of this Agreement. Nevertheless, if there is any conflict among the terms and conditions of this Agreement and those of any such provision or provisions so incorporated by reference, this Agreement shall govern over the document referenced.
6.16. Costs. Each party shall bear its own costs and fees incurred in the preparation and negotiation of this Agreement and in the performance of its obligations hereunder except as expressly provided herein.
6.17. Binding Effect. This Agreement binds and benefits the parties and their respective permitted successors and assigns.
6.18. No Third Party Beneficiary Rights . This Agreement is entered into for the sole benefit of City and Contractor and no other parties are intended to be direct or incidental beneficiaries of this Agreement and no third party shall have any right in, under or to this Agreement.
6.19. Headings. Headings contained in this Agreement are included solely for convenience and are not intended to modify, explain or to be a full or accurate description of the content thereof and shall not in any way affect the meaning or interpretation of this Agreement.
6.20. Construction. The parties have participated jointly in the negotiation and drafting of this Agreement and have had an adequate opportunity to review each and every provision of the Agreement and submit the same to counsel or other consultants for review and comment. In the event an ambiguity or question of intent or interpretation arises with respect to this Agreement, this Agreement shall be construed as if drafted jointly by the parties and in accordance with its 667
10 BCS Consultants, Inc.
Form Rev. 07-07-2025
fair meaning. There shall be no presumption or burden of proof favoring or disfavoring any party by virtue of the authorship of any of the provisions of this Agreement.
6.21. Amendments. Only a writing executed by the parties hereto or their respective successors and assigns may amend this Agreement.
6.22. Waiver. The delay or failure of either party at any time to require performance or compliance by the other of any of its obligations or agreements shall in no way be deemed a waiver of those rights to require such performance or compliance. No waiver of any prov ision of this Agreement shall be effective unless in writing and signed by a duly authorized representative of the party against whom enforcement of a waiver is sought. The waiver of any right or remedy in respect to any occurrence or event s hall not be deemed a waiver of any right or remedy in respect to any other occurrence or event, nor shall any waiver constitute a continuing waiver.
6.23. Severability. If any provision of this Agreement is determined by a court of competent jurisdiction to be unenforceable in any circumstance, such determination shall not affect the validity or enforceability of the remaining terms and provisions hereof or of the offending provision in any other circumstance. Notwithstanding the foregoing, if the value of this Agreement, based upon the substantial benefit of the bargain for any party , is materially impaired, which determination made by the presiding court or arbitrator of competent jurisdiction shall be binding, then both parties agree to substitute such provision(s) through good faith negotiations.
6.24. Counterparts. This Agreement may be executed in one or more counterparts, each of which shall be deemed an original. All counterparts shall be construed together and shall constitute one agreement.
6.25. Corporate Authority . The persons executing this Agreement on behalf of the parties hereto warrant that they are duly authorized to execute this Agreement on behalf of said parties and that by doing so the parties hereto are formally bound to the provisions of this Agreement.
[Signature page follows.]
668
11 BCS Consultants, Inc.
Form Rev. 07-07-2025
IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed by and through their respective authorized officers, as of the date first above written.
CONTRACTOR
__________________________________ Date: __________________________ Signature
__________________________________
Sunny Rajab, CEO
__________________________________ Date: __________________________ Signature
__________________________________
[Name and Title]
CITY OF COSTA MESA
__________________________________ Date: __________________________ Cecilia Gallardo-Daly
Interim City Manager
ATTEST:
__________________________________
Brenda Green
City Clerk
APPROVED AS TO FORM:
__________________________________ Date: __________________________ Kimberly Hall Barlow
City Attorney
APPROVED AS TO INSURANCE:
__________________________________ Date: __________________________ Ruth Wang
Risk Management
669
12 BCS Consultants, Inc.
Form Rev. 07-07-2025
APPROVED AS TO CONTENT:
__________________________________ Date: __________________________ Rupsi Burman
Project Manager
DEPARTMENTAL APPROVAL:
__________________________________ Date: __________________________ Steve Ely
IT Director
APPROVED AS TO PURCHASING:
__________________________________ Date: __________________________ Carol Molina
Finance Director
670
671
9910 Irvine Center Drive | Irvine | CA | 92618
www.bcsconsultants.com | (949) 333-1000
Friday, December 13, 2024
City of Costa Mesa
Mike Fuentes
77 Fair Drive
Costa Mesa, CA 92626
[email protected]
Dear Mike,
Please accept the following BCS Consultants Proposal for the Request for Proposal 25-05. We sincerely appreciate the opportunity to present this proposal for your consideration.
Founded in 2001 BCS Consultants is a technology-driving women owned, single-source solution provider of audiovisual, security, network, cabling, and wireless solutions, offering various products and services under one roof. We will provide all the services for your project based from our Headquarters at 9910 Irvine Center Dr, Irvine CA 92618.
We specializes in Design/Consultation, Project Management, and Implementations such as this and for every communication and data facet of running a business, so we understand how it’s all connected.
BCS has provide Network Cabling and Verkada Camera installation services for the City of Costa Mesa since 2022, and is one of the first Verkada Partners working as an integrator for them since 2019.
We have greatly appreciated working with the City for the past couple of years in provide design and estimating services for this project. Throughout this process we have become extremely familiar with the requirements for this project and our confident we can deliver this as a successful project for you this next year.
Thank you again for providing BCS Consultants with the opportunity to provide you with a proposal.
Your BCS Team
Sunny Rajab
CEO
BCS Consultants
Page: 2 of 25Quote #040837 v1
672
9910 Irvine Center Drive | Irvine | CA | 92618
www.bcsconsultants.com | (949) 333-1000
Stage 1 Background & Project Summary
Stage 1 - Enterprise Cabling Cat6A
BCS will provide a New Enterprise Structured Cabling System end-to-end certified for transmission of voice, data, and video signals as specified with the RFP with Category 6A specifications. o The purpose of the new infrastructure is to replace the existing obsolete Cat 5 infrastructure across 13 Site locations listed below.
o This stage of the project will include a complete Survey/Design of the new Infrastructure Cabling required for each building with the City IT personnel, Installation Floor Plans created for each building, Installation & Termination of end-to-end infrastructure and pathways, Certification Testing/Administrative Labeling/As-Builts of every location, Demo/Removal of the existing infrastructure, and a 15 Year Certified Warranty. o The Base Scope includes One Thousand, Five Hundred (1,500) Cat6A cables for the City of Costa Mesa at the following locations:
1. City Hall, 77 Fair Dr - 700 Cables
2. Corporate Yard, 2310 Placentia Ave - 96 Cables
3. Neighborhood Community, 1845 Park Ave - 48 Cables
4. Downtown Recreation Center, 1860 Anaheim - 96 Cables
5. Senior Center, 695 W 19th St - 96 Cables
6. Fire Station 2, 800 Baker St - 24 Cables
7. Fire Station 3, 1865 Park Ave - 24 Cables
8. Fire Station 4, 2300 Placentia Ave - 24 Cables
9. Fire Station 5, 2450 Vanguard Way - 24 Cables
10. Fire Station 6, 3350 Sakioka Dr - 24 Cables
11. Communications, 79 Fair Dr - 128 Cables
12. Westside Substation, 565 W 18th St - 48 Cables
13. South Coast Plaza Sub, 3333 Bristol St - 24 Cables
*144 Cables locations to be determined during site surveys and walk throughs of each building All Stage 1 Bid Cabling will be provided per RFP specifications and summarized below o Material Product Data Submittals for City review of all cabling plant for new Cat6A White cabling, Patch Panels, Jacks, Wall Plates, Supports, all to be provided. o Coordinate with City IT on labeling scheme with identification of Outlets/Panels o Ensure designed infrastructure meets EIA/TIA distance limitations o Coordinate with City on each existing building MDF or IDF location and propose as needed additional improvements to be reassessed in project budget o Design infrastructure pathways for utilization of new and existing pathways o Support cables with existing/new support infrastructure with 6' Service Loops o Maintaining cables bend radius/bundle sizes, dress with Velcro cable straps o Fire stop any cabling penetrations utilized where applicable o Certification Test Results for all cables with Fluke Tester DTX1800 or better o Process and submit Certification Plus System 15 Year Warranty for the network cabling o Provide removal/demo of existing network cables and patch cables no longer in use Page: 3 of 25Quote #040837 v1
673
9910 Irvine Center Drive | Irvine | CA | 92618
www.bcsconsultants.com | (949) 333-1000
Stage 2 Background & Project Summary
Stage 2 Verkada Camera Install Cat6 enhanced
BCS will provide New Thirty-five (35) Cat 6 Enhanced cables with end-to-end connectivity to provide service for the installation of 32 Verkada Cloud Cameras and 3 Viewing Stations at the City of Costa Mesa Police Dept/Comm Buildings and Parking
This stage of the project will include a complete new Infrastructure Cabling required for each security device/location listed, Installation Floor Plans created for each building, Installation & Termination of end-to-end infrastructure and pathways, Certification Testing/Administrative Labeling/As-Builts of every location, Installation of the New Cameras, Mounts, Displays, and Viewing Stations, Demo/Removal of the existing infrastructure and cameras, and a 15 Year Certified Warranty on the infrastructure.
We have included the POE network extenders for each of the camera locations previously surveyed that will need to be included.
BCS will provide new cable raceway for 6 locations reviewed with City during original walk through assessment. It is assumed that all the existing conduit raceways for each of the exterior and interior cabling pathways will be reusable to pull the existing cabling out of the conduit and pull the new cable in without additional conduit required.
BCS will furnish POE Extenders for locations identified during the walk through. Any locations to be MultiSensor locations, City to furnish POE Verkada Injector/switch within distance. City of Costa Mesa responsible for providing all POE switch ports with internet connectivity and shared access to Verkada Command with installers while onsite to allow for camera adjustments. City of Costa Mesa is responsible for pre-activation, naming, settings setup and firmware updates of all cameras prior to camera installation.
All Stage 2 Bid Cabling will be provided by BCS based on the RFP specification as summarized below
o Site Surveys of each Building, Preliminary cabling floor plan drawings for approval and finalized AsBuilts
o Material Product Data Submittals for City review of all cabling plant for new Cat6 cabling o Coordinate with City IT and provide an approved labeling scheme with identification on each end at Outlet and Patch Panel
o Ensure designed infrastructure meets requirements to provide all cabling within 295 feet from Outlet to Patch Panel
o Coordinate with City on each existing building MDF or IDF locations for camera cabling o Design infrastructure pathways for utilization of new and existing pathways o Support all cables with JHooks and independent supports or utilization of existing conduits where applicable
o Maintaining cables bend radius and service loops
o Support and dress all cables with Velcro cable straps o Fire stop any cabling penetrations utilized where applicable o Certification Test Results for all cables with Fluke Tester DTX1800 or better o Process and submit Certification Plus System 15 Year Warranty for the network cabling o Coordinate for removal and demo of existing network cables and cameras Page: 4 of 25Quote #040837 v1
674
9910 Irvine Center Drive | Irvine | CA | 92618
www.bcsconsultants.com | (949) 333-1000
Stage 2 Background & Project Summary
The following locations will be included per the RFP
Interior Camera Locations for Police/Comm. Station Buildings with Verkada 60 Day Cameras:
*Main Visitor Lobby
*Lobby Behind Counter
*Lobby Door (Eye Level)
*Lobby Hallway/RR
*Property Entry
*Safe Room C1
*Safe Room C2
*Gun Storage
*Front Desk/Package Hallway
*NE Hallway around Jail by Break Patio Door
*Room next to Patio Door
Exterior Camera Locations for Police/Comm. Exterior Areas with Verkada 60 Day Cameras:
*Front Lobby Entrance
*North Visitor Parking
*North Visitor Entrance (LPR Mode)
*Front Walkway outside Main Ent
*Front Walkway outside Property
*Front NE Corner Walkway
*NE Pedestrian Gate
*E Vehicle Gate
*Comm Prk. Lot
*Back of Comm. Bldg.
*SW Corner of Comm. Bldg.
*NW Corner of Comm. Bldg.
*Comm N. Entry Door (by Phone)
[Note: BCS has included a new Verkada Video Intercom in our bid to replace phone/camera]
*SW Vehicle Gate
*E Pkg Ped Gate
*E Pkg NE Hel. Pad
*CSE Door
*NW Prk Hel. Pad
*NW Prk. SW Entry
*NW Veh. Gate
*W. Entry
Viewing Station Locations:
*Watch Commander#1 & 2 - 2 New View Stations and 2 New 43" Displays and Ceiling Hung Mounts
*Communications - 1 New Station with 1 New 65" Display and Wall or Ceiling Mount Page: 5 of 25Quote #040837 v1
675
9910 Irvine Center Drive | Irvine | CA | 92618
www.bcsconsultants.com | (949) 333-1000
Stage 3 Background & Project Summary
BCS will provide Eighteen (18) Singlemode Fiber Optic Backbones Cabling utilizing the building ceiling spaces and existing conduits/sleeves between each floor and building. The fiber pathways with 1" Innerduct for ceiling/ladder rack pathways where no Armor is present All fiber will be terminated into Rack or Wall Mounted Fiber Cabinets as applicable, with LC Duplex Coupler Panels and LC Fusion Splice Pigtails.
All Fiber will be Certification Tested and BCS will coordinate with the City to provide a common easy to use Fiber Administrative Labeling Scheme for all connectivity. The following fiber backbones have been requested;
o City Hall Server Room
24Fiber CH Server Rm/PD Net Rack – to – CH Server Rm/PD Server Cabinet 24Fiber CH Server Rm/CH Net Rack – to – CH Server Rm/PD Server Cabinet o City Hall IDFs
12Fiber CH Server Rm/CH Net Rack – to – CH Basement IDF(1U) 12Fiber CH Server Rm/CH Net Rack – to – CH 1st Floor Video Rm IDF(1U) 12Fiber CH Server Rm/CH Net Rack – to – CH 2nd Floor IDF(1U) 12Fiber CH Server Rm/CH Net Rack – to – CH 3rd Floor IDF(1U) 12Fiber CH Server Rm/CH Net Rack – to – CH 4th Floor IDF(1U) 12Fiber CH Server Rm/CH Net Rack – to – CH 5th Floor IDF(1U) o OSP Fiber Cables
24Fiber CH Server Rm/PD Net Rack – to – Comm. Bldg(#4-2U) 12Fiber Comm. Bldg – to – Fire Station(1U)
12Fiber CH Server Rm/CH Net Rack – to – PD Fuel Pump Shack Wall Mt(2PWM) 12Fiber CH Server Rm/CH Net Rack – to – PD Helicopter Pad Wall Mt(2PWM) o Police Dept.
12Fiber PD Basement – to – PD 1st Floor IDF(1U)
12Fiber PD Basement – to – PD 2nd Floor IDF(1U)
12Fiber PD Basement – to – PD 1st Floor EOC IDF(1U)
o Downtown Rec Center Campus
12Fiber DRC - to - Norma Hertzog Community Center
12Fiber DRC - to - Donald Dugan Library
12Fiber DRC - to - Aquatics Center
After Costa Mesa IT cut over existing connections to new fiber, BCS will demo existing fiber.
Page: 6 of 25Quote #040837 v1
676
9910 Irvine Center Drive | Irvine | CA | 92618
www.bcsconsultants.com | (949) 333-1000
Stage 4 Background & Summary
EOC Rack Relocation
>BCS will provide the relocation of the existing EOC IDF to include Remove fiber enclosures and pull fiber back to new IDF location. Remove copper cables from patch panels and pull cables back to new IDF location. Remove IDF rack and relocate to new IDF location.
Remove ladder racking and reuse as necessary for new location. Install ladder rack, fiber enclosures, copper patch panels back onto IDF rack. Dress and load fiber into fiber enclosures.
Re-terminate and retest all copper & fiber cables on to existing panels. Provide and Install 80 new Cat6a cables that won’t reach from previous IDF location to new IDF location.
Provide Cat6a patch panels and keystones as needed
Provide 80 Cat6a network patch cables
Terminate test and label newly install Cat6a cables.
All Stage 4 Bid Cabling will be provided per RFP specifications and summarized below o Material Product Data Submittals for City review of all cabling plant for new Cat6A White cabling, Patch Panels, Jacks, Wall Plates, Supports, all to be provided. o Coordinate with City IT on labeling scheme with identification of Outlets/Panels o Ensure designed infrastructure meets EIA/TIA distance limitations o Coordinate with City on each existing building MDF or IDF location and propose as needed additional improvements to be reassessed in project budget o Design infrastructure pathways for utilization of new and existing pathways o Support cables with existing/new support infrastructure with 6' Service Loops o Maintaining cables bend radius/bundle sizes, dress with Velcro cable straps o Fire stop any cabling penetrations utilized where applicable o Certification Test Results for all cables with Fluke Tester DTX1800 or better o Process and submit Certification Plus System 15 Year Warranty for the network cabling o Provide removal/demo of existing network cables and patch cables no longer in use Page: 7 of 25Quote #040837 v1
677
9910 Irvine Center Drive | Irvine | CA | 92618
www.bcsconsultants.com | (949) 333-1000
Method of Approach
After review of the project, the site bid walk through and from our previous experience working in the City buildings we'd like to propose the following implementation plan. This approach can be coordinated to be adjusted as needed. Each step within this approach will include each Stage for consideration and based upon what the City agrees to.
Project Kickoff: Meeting with the City to discuss the project including but not limited to Building Priorities, Network Cabling, Schedule, Funding Approval, Review of City existing plans o Product Data Submittals will be provided to include cut sheets on all products proposed for City review
o BCS will provide a digital shared drive to document storage for plans, test reports, meeting notes, progress photos and additional documentation for the project o Identify Project Contacts for City to coordinate access to all buildings Predesign Coordination:
o BCS to use existing City provided plans to develop preliminary schematic base floor plans o Preliminary Schedule to be created based of kick off meeting Detailed Design/Review:
o BCS will schedule initial building surveys to verify floor plans for detailed design plans, adjustments to plans, gather visible network cabling requirements for each site and to obtain preliminary infrastructure assessment information.
o The completed detailed design plan and assessment for each building will be provided to the City for review.
o BCS will coordinate a meeting, conference call, or approval walk through to BCS PM, City IT Dept. and any additional City Personnel that may be required to determine final requirements.
Installation:
o Site installation schedule to be coordinated with priorities to be determined with City IT Personnel. The following we understand is a list of priority, but will provide separate project teams as needed to execute with diligence.
Verkada Camera Installation
Fiber Backbone Installation
CAT6A Upgrade
EOC
o Technician site kick off
o QA walk throughs of each site in progress weekly
o Progress/Coordination meetings and progress reports weekly for City o Additional coordination daily/weekly as Cameras are brought online for the Police Dept/Comm installation to verify FoV approval
o Asbuilts and test results will be provided for each building as they are completed o Final walk through for sign off of each site with City o Project Closeout Manuals provided on all building plans both electronic and hard copies Page: 8 of 25Quote #040837 v1
678
9910 Irvine Center Drive | Irvine | CA | 92618
www.bcsconsultants.com | (949) 333-1000
Qualifications & Experience
General Company information
Company name: Afsaneh Enterprises, Inc. dba BCS Consultants (BCS) Address since 2008: 9910 Irvine Center Drive, Irvine, CA 92618 Phone number: (949) 333-1000, Fax number: (949) 333-1001 Website: www.bcsconsultants.com
Firm Background & Licensing:
Established: 2001 S. Corporation, Federal Tax ID#: 33-0985618 Afsaneh Rajab, Chairman, Secretary, Treasurer
Special company classifications: SWBE (100% woman-owned) California contractor’s license number: C7, C28 # 852163, Expires 1/31/25 California Alarm License - ACO7989
Costa Mesa Business License #RCON-23-0921, Expires 10/31/25 CMAS Approved File #20216606065
Community & Charitable Contributions
o https://www.bcsconsultants.com/about/community/
Personnel & bid contacts.
Account Contact:
o Sunny Rajab (email: [email protected], direct: 949-333-1007) Project Contact:
o William Lowden ([email protected], , direct: 949-333-1041) Accounting Contact:
o Sarah Sheldon (email: [email protected], direct: 949-333-1005) Page: 9 of 25Quote #040837 v1
679
9910 Irvine Center Drive | Irvine | CA | 92618
www.bcsconsultants.com | (949) 333-1000
Qualifications & Experience
Page: 10 of 25Quote #040837 v1
680
9910 Irvine Center Drive | Irvine | CA | 92618
www.bcsconsultants.com | (949) 333-1000
Qualifications & Experience
Page: 11 of 25Quote #040837 v1
681
9910 Irvine Center Drive | Irvine | CA | 92618
www.bcsconsultants.com | (949) 333-1000
Key Personnel
Page: 12 of 25Quote #040837 v1
682
9910 Irvine Center Drive | Irvine | CA | 92618
www.bcsconsultants.com | (949) 333-1000
Key Personnel
Page: 13 of 25Quote #040837 v1
683
9910 Irvine Center Drive | Irvine | CA | 92618
www.bcsconsultants.com | (949) 333-1000
Key Personnel
Page: 14 of 25Quote #040837 v1
684
9910 Irvine Center Drive | Irvine | CA | 92618
www.bcsconsultants.com | (949) 333-1000
Additional Forms
Page: 15 of 25Quote #040837 v1
685
9910 Irvine Center Drive | Irvine | CA | 92618
www.bcsconsultants.com | (949) 333-1000
Additional Forms
Page: 16 of 25Quote #040837 v1
686
687
688
9910 Irvine Center Drive | Irvine | CA | 92618
www.bcsconsultants.com | (949) 333-1000
Additional Forms
Page: 19 of 25Quote #040837 v1
689
9910 Irvine Center Drive | Irvine | CA | 92618
www.bcsconsultants.com | (949) 333-1000
Stage 1 Labor Cost Proposal
Product Details Qty
Installation Labor/Equip 1
PM/Engineering/Design Services 1
Admin 1
Subtotal: $262,500.00
Stage 1 Materials Cost Proposal
Product Details Qty
Stage 1 Materials
Category 6A, White 10 MTP 260
Cat 6A Jack Module, White 1500
2 Port White Wall Plates 600
4 Port White Wall Plates 50
2 Port Surface Mount Box 200
Blank insert - white 100
24-Port Black Flat Flush Mount Modular Patch Panel 65
Cat 6A Jack Module, White 1500
5' Cat 6A White 28AWG UTP Patch Cable 1500
24" Straight Rod, EC, 90Deg Foot, 1-1/4" PA Pin 1000
3/4" JHook Supports 500
2" JHook Supports 500
3/4 in velcro black fire rated 25 yds. plenum 20
Misc Materials 1
Subtotal: $271,422.24
Page: 20 of 25Quote #040837 v1
690
9910 Irvine Center Drive | Irvine | CA | 92618
www.bcsconsultants.com | (949) 333-1000
Stage 2 Labor Cost Proposal
Product Details Qty
Stage 2 Labor
Labor/Equip 1
PM/Engineering/Design Services 1
Admin 1
Subtotal: $25,680.00
Stage 2 Materials Cost Proposal
Product Details Qty
Stage 2 Materials
Orange Plenum Cat 6 UTP Cable 7
Black OSP Cat 6 UTP Cable 4
24-Port Black Flat Flush Mount Modular Patch Panel 2
Cat6 Jack Panel Modules - Yellow 35
Cat6 Jack Consol. Pt Modules - Yellow 20
8 Cond Mod 22/24 AWG Solid Connectors 2
Longspan Base 10/100 PoE Extender 6
75" 4K 3840X2160 UHD Commercial Display 1
43" 4K 3840X2160 UHD, Commercial Display 2
Ceiling/Wall Mounts and HDMI Cables 3
5' Cat6 Orange 28AWG Patch Cable 35
Verkada Viewing Station 3
Verkada Viewing Station License 3
Verkada All-In-One Video Intercom 1
Verkada Intercom License 1
Subtotal: $23,643.47
Page: 21 of 25Quote #040837 v1
691
9910 Irvine Center Drive | Irvine | CA | 92618
www.bcsconsultants.com | (949) 333-1000
Stage 3 Labor Cost Proposal
Product Details Qty
Stage 3 Labor
Labor 1
PM/Engineering/Design Services 1
Admin 1
Subtotal: $64,375.00
Stage 3 Materials Cost Proposal
Product Details Qty
Stage 3 Materials
12-Fiber Singlemode OS2 Tight-Buffer Plenum Fiber Optic Cable 3000 12-Fiber Singlemode FrdmO TB Indoor/Outdoor Plenum 4000 24-Fiber Singlemode FrdmO TB Indoor/Outdoor Plenum 1000 1U Connector Housing F/2 Panels 15
2U Connector Housing F/4 Panels 7
4U Connector Housing F/12 Panels 2
12-Fiber LC OS2 Duplex Pigtailed Splice Cassette Housing 30 24-Fiber LC OS2 Duplex Pigtailed Splice Cassette Housing 6 1-1/4" Corrugated Flexible Duct 100
1" Corrugated Flexible Duct 1200
Misc. Materials 1
2M Fiber Patch Cables, LC to LC, Duplex, Yellow, Singlemode 100 Subtotal: $50,743.14
Page: 22 of 25Quote #040837 v1
692
9910 Irvine Center Drive | Irvine | CA | 92618
www.bcsconsultants.com | (949) 333-1000
Stage 4 Labor Cost Proposal
Product Details Qty
Stage 4 Labor
Labor 1
PM/Engineering/Design Services 1
Admin 1
Subtotal: $22,250.00
Stage 4 Materials Cost Proposal
Product Details Qty
Stage 4 Materials
Category 6A, White 10 MTP 14
Cat 6A Jack Module, White 160
2 Port White Wall Plates 40
4 Port White Wall Plates 5
2 Port Surface Mount Box 5
Blank insert - white 50
24-Port Black Flat Flush Mount Modular Patch Panel 4
5' Cat 6A White 28AWG UTP Patch Cable 80
Subtotal: $15,764.73
Page: 23 of 25Quote #040837 v1
693
694
9910 Irvine Center Drive | Irvine | CA | 92618
www.bcsconsultants.com | (949) 333-1000
Standard Labor Rates
1. Single Mode Fiber install for indoor use.
o Labor Cost per foot installed: $10 per foot
2. Single Mode Fiber install for Outdoor use in existing conduit o Labor Cost per foot installed: $15 per foot
3. CAT6A network drop install for indoor use.
o Labor Cost per foot installed: $5 per foot
4. Verkada camera install and Cat6 Enhanced network drop install for indoor use. o Labor Cost per foot installed: $10 per foot
5. Verkada camera install and Cat6 Enhanced network drop install for outdoor use. o Labor Cost per foot installed: $15 per foot
Page: 25 of 25Quote #040837 v1
695
We have prepared a quote for you
RFP 25-05 Enterprise Cabling, Cameras,
Fiber, EOC
Quote # 040837 Version 1
Prepared for: Prepared by:
City of Costa Mesa BCS Consultants
Mike Fuentes
[email protected]
Sunny Rajab
[email protected]
Innovative and customized solutions your business needs to
COMMUNICATE CONNECT COLLABORATE
ATTACHMENT 4
696
9910 Irvine Center Drive | Irvine | CA | 92618
www.bcsconsultants.com | (949) 333-1000
Monday, March 10, 2025
City of Costa Mesa
Mike Fuentes
77 Fair Drive
Costa Mesa, CA 92626
[email protected]
Dear Mike,
Please accept the following BCS Consultants Proposal for the Request for Proposal 25-05. We sincerely appreciate the opportunity to present this proposal for your consideration.
Founded in 2001 BCS Consultants is a technology-driving women owned, single-source solution provider of audiovisual, security, network, cabling, and wireless solutions, offering various products and services under one roof. We will provide all the services for your project based from our Headquarters at 9910 Irvine Center Dr, Irvine CA 92618.
We specializes in Design/Consultation, Project Management, and Implementations such as this and for every communication and data facet of running a business, so we understand how it’s all connected.
BCS has provide Network Cabling and Verkada Camera installation services for the City of Costa Mesa since 2022, and is one of the first Verkada Partners working as an integrator for them since 2019.
We have greatly appreciated working with the City for the past couple of years in provide design and estimating services for this project. Throughout this process we have become extremely familiar with the requirements for this project and our confident we can deliver this as a successful project for you this next year.
Thank you again for providing BCS Consultants with the opportunity to provide you with a proposal.
Your BCS Team
Sunny Rajab
CEO
BCS Consultants
Page: 2 of 25Quote #040837 v1
697
9910 Irvine Center Drive | Irvine | CA | 92618
www.bcsconsultants.com | (949) 333-1000
Stage 1 Background & Project Summary
Stage 1 - Enterprise Cabling Cat6A
BCS will provide a New Enterprise Structured Cabling System end-to-end certified for transmission of voice, data, and video signals as specified with the RFP with Category 6A specifications. o The purpose of the new infrastructure is to replace the existing obsolete Cat 5 infrastructure across 13 Site locations listed below.
o This stage of the project will include a complete Survey/Design of the new Infrastructure Cabling required for each building with the City IT personnel, Installation Floor Plans created for each building, Installation & Termination of end-to-end infrastructure and pathways, Certification Testing/Administrative Labeling/As-Builts of every location, Demo/Removal of the existing infrastructure, and a 15 Year Certified Warranty. o The Base Scope includes One Thousand, Five Hundred (1,500) Cat6A cables for the City of Costa Mesa at the following locations:
1. City Hall, 77 Fair Dr - 700 Cables
2. Corporate Yard, 2310 Placentia Ave - 96 Cables
3. Neighborhood Community, 1845 Park Ave - 48 Cables
4. Downtown Recreation Center, 1860 Anaheim - 96 Cables
5. Senior Center, 695 W 19th St - 96 Cables
6. Fire Station 2, 800 Baker St - 24 Cables
7. Fire Station 3, 1865 Park Ave - 24 Cables
8. Fire Station 4, 2300 Placentia Ave - 24 Cables
9. Fire Station 5, 2450 Vanguard Way - 24 Cables
10. Fire Station 6, 3350 Sakioka Dr - 24 Cables
11. Communications, 79 Fair Dr - 128 Cables
12. Westside Substation, 565 W 18th St - 48 Cables
13. South Coast Plaza Sub, 3333 Bristol St - 24 Cables
*144 Cables locations to be determined during site surveys and walk throughs of each building All Stage 1 Bid Cabling will be provided per RFP specifications and summarized below o Material Product Data Submittals for City review of all cabling plant for new Cat6A White cabling, Patch Panels, Jacks, Wall Plates, Supports, all to be provided. o Coordinate with City IT on labeling scheme with identification of Outlets/Panels o Ensure designed infrastructure meets EIA/TIA distance limitations o Coordinate with City on each existing building MDF or IDF location and propose as needed additional improvements to be reassessed in project budget o Design infrastructure pathways for utilization of new and existing pathways o Support cables with existing/new support infrastructure with 6' Service Loops o Maintaining cables bend radius/bundle sizes, dress with Velcro cable straps o Fire stop any cabling penetrations utilized where applicable o Certification Test Results for all cables with Fluke Tester DTX1800 or better o Process and submit Certification Plus System 15 Year Warranty for the network cabling o Provide removal/demo of existing network cables and patch cables no longer in use Page: 3 of 25Quote #040837 v1
698
9910 Irvine Center Drive | Irvine | CA | 92618
www.bcsconsultants.com | (949) 333-1000
Stage 2 Background & Project Summary
Stage 2 Verkada Camera Install Cat6 enhanced
BCS will provide New Thirty-five (35) Cat 6 Enhanced cables with end-to-end connectivity to provide service for the installation of 32 Verkada Cloud Cameras and 3 Viewing Stations at the City of Costa Mesa Police Dept/Comm Buildings and Parking
This stage of the project will include a complete new Infrastructure Cabling required for each security device/location listed, Installation Floor Plans created for each building, Installation & Termination of end-to-end infrastructure and pathways, Certification Testing/Administrative Labeling/As-Builts of every location, Installation of the New Cameras, Mounts, Displays, and Viewing Stations, Demo/Removal of the existing infrastructure and cameras, and a 15 Year Certified Warranty on the infrastructure.
We have included the POE network extenders for each of the camera locations previously surveyed that will need to be included.
BCS will provide new cable raceway for 6 locations reviewed with City during original walk through assessment. It is assumed that all the existing conduit raceways for each of the exterior and interior cabling pathways will be reusable to pull the existing cabling out of the conduit and pull the new cable in without additional conduit required.
BCS will furnish POE Extenders for locations identified during the walk through. Any locations to be MultiSensor locations, City to furnish POE Verkada Injector/switch within distance. City of Costa Mesa responsible for providing all POE switch ports with internet connectivity and shared access to Verkada Command with installers while onsite to allow for camera adjustments. City of Costa Mesa is responsible for pre-activation, naming, settings setup and firmware updates of all cameras prior to camera installation.
All Stage 2 Bid Cabling will be provided by BCS based on the RFP specification as summarized below
o Site Surveys of each Building, Preliminary cabling floor plan drawings for approval and finalized AsBuilts
o Material Product Data Submittals for City review of all cabling plant for new Cat6 cabling o Coordinate with City IT and provide an approved labeling scheme with identification on each end at Outlet and Patch Panel
o Ensure designed infrastructure meets requirements to provide all cabling within 295 feet from Outlet to Patch Panel
o Coordinate with City on each existing building MDF or IDF locations for camera cabling o Design infrastructure pathways for utilization of new and existing pathways o Support all cables with JHooks and independent supports or utilization of existing conduits where applicable
o Maintaining cables bend radius and service loops
o Support and dress all cables with Velcro cable straps o Fire stop any cabling penetrations utilized where applicable o Certification Test Results for all cables with Fluke Tester DTX1800 or better o Process and submit Certification Plus System 15 Year Warranty for the network cabling o Coordinate for removal and demo of existing network cables and cameras Page: 4 of 25Quote #040837 v1
699
9910 Irvine Center Drive | Irvine | CA | 92618
www.bcsconsultants.com | (949) 333-1000
Stage 2 Background & Project Summary
The following locations will be included per the RFP
Interior Camera Locations for Police/Comm. Station Buildings with Verkada 60 Day Cameras:
*Main Visitor Lobby
*Lobby Behind Counter
*Lobby Door (Eye Level)
*Lobby Hallway/RR
*Property Entry
*Safe Room C1
*Safe Room C2
*Gun Storage
*Front Desk/Package Hallway
*NE Hallway around Jail by Break Patio Door
*Room next to Patio Door
Exterior Camera Locations for Police/Comm. Exterior Areas with Verkada 60 Day Cameras:
*Front Lobby Entrance
*North Visitor Parking
*North Visitor Entrance (LPR Mode)
*Front Walkway outside Main Ent
*Front Walkway outside Property
*Front NE Corner Walkway
*NE Pedestrian Gate
*E Vehicle Gate
*Comm Prk. Lot
*Back of Comm. Bldg.
*SW Corner of Comm. Bldg.
*NW Corner of Comm. Bldg.
*Comm N. Entry Door (by Phone)
*SW Vehicle Gate
*E Pkg Ped Gate
*E Pkg NE Hel. Pad
*CSE Door
*NW Prk Hel. Pad
*NW Prk. SW Entry
*NW Veh. Gate
*W. Entry
Viewing Station Locations:
*Watch Commander#1 & 2 - 2 New View Stations and 2 New 43" Displays and Ceiling Hung Mounts
*Communications - 1 New Station with 1 New 65" Display and Wall or Ceiling Mount Page: 5 of 25Quote #040837 v1
[Note: BCS has included a new Verkada Video Intercom in our bid to replace phone/camera] (ALTERNATE #1)
700
9910 Irvine Center Drive | Irvine | CA | 92618
www.bcsconsultants.com | (949) 333-1000
Stage 3 Background & Project Summary
BCS will provide Eighteen (18) Singlemode Fiber Optic Backbones Cabling utilizing the building ceiling spaces and existing conduits/sleeves between each floor and building. The fiber pathways with 1" Innerduct for ceiling/ladder rack pathways where no Armor is present All fiber will be terminated into Rack or Wall Mounted Fiber Cabinets as applicable, with LC Duplex Coupler Panels and LC Fusion Splice Pigtails.
All Fiber will be Certification Tested and BCS will coordinate with the City to provide a common easy to use Fiber Administrative Labeling Scheme for all connectivity. The following fiber backbones have been requested;
o City Hall Server Room
24Fiber CH Server Rm/PD Net Rack – to – CH Server Rm/PD Server Cabinet 24Fiber CH Server Rm/CH Net Rack – to – CH Server Rm/PD Server Cabinet o City Hall IDFs
12Fiber CH Server Rm/CH Net Rack – to – CH Basement IDF(1U) 12Fiber CH Server Rm/CH Net Rack – to – CH 1st Floor Video Rm IDF(1U) 12Fiber CH Server Rm/CH Net Rack – to – CH 2nd Floor IDF(1U) 12Fiber CH Server Rm/CH Net Rack – to – CH 3rd Floor IDF(1U) 12Fiber CH Server Rm/CH Net Rack – to – CH 4th Floor IDF(1U) 12Fiber CH Server Rm/CH Net Rack – to – CH 5th Floor IDF(1U) o OSP Fiber Cables
24Fiber CH Server Rm/PD Net Rack – to – Comm. Bldg(#4-2U) 12Fiber Comm. Bldg – to – Fire Station(1U)
12Fiber CH Server Rm/CH Net Rack – to – PD Fuel Pump Shack Wall Mt(2PWM) 12Fiber CH Server Rm/CH Net Rack – to – PD Helicopter Pad Wall Mt(2PWM) o Police Dept.
12Fiber PD Basement – to – PD 1st Floor IDF(1U)
12Fiber PD Basement – to – PD 2nd Floor IDF(1U)
12Fiber PD Basement – to – PD 1st
12Fiber DRC - to - Norma Hertzog Community Center
12Fiber DRC - to - Donald Dugan Library
12Fiber DRC - to - Aquatics Center
After Costa Mesa IT cut over existing connections to new fiber, BCS will demo existing fiber.
Page: 6 of 25Quote #040837 v1
Floor EOC IDF(1U)
o Downtown Rec Center Campus(ALTERNATE #2)
701
9910 Irvine Center Drive | Irvine | CA | 92618
www.bcsconsultants.com | (949) 333-1000
Stage 4 Background & Summary
EOC Rack Relocation
>BCS will provide the relocation of the existing EOC IDF to include Remove fiber enclosures and pull fiber back to new IDF location. Remove copper cables from patch panels and pull cables back to new IDF location. Remove IDF rack and relocate to new IDF location.
Remove ladder racking and reuse as necessary for new location. Install ladder rack, fiber enclosures, copper patch panels back onto IDF rack. Dress and load fiber into fiber enclosures.
Re-terminate and retest all copper & fiber cables on to existing panels. Provide and Install 80 new Cat6a cables that won’t reach from previous IDF location to new IDF location.
Provide Cat6a patch panels and keystones as needed
Provide 80 Cat6a network patch cables
Terminate test and label newly install Cat6a cables.
All Stage 4 Bid Cabling will be provided per RFP specifications and summarized below o Material Product Data Submittals for City review of all cabling plant for new Cat6A White cabling, Patch Panels, Jacks, Wall Plates, Supports, all to be provided. o Coordinate with City IT on labeling scheme with identification of Outlets/Panels o Ensure designed infrastructure meets EIA/TIA distance limitations o Coordinate with City on each existing building MDF or IDF location and propose as needed additional improvements to be reassessed in project budget o Design infrastructure pathways for utilization of new and existing pathways o Support cables with existing/new support infrastructure with 6' Service Loops o Maintaining cables bend radius/bundle sizes, dress with Velcro cable straps o Fire stop any cabling penetrations utilized where applicable o Certification Test Results for all cables with Fluke Tester DTX1800 or better o Process and submit Certification Plus System 15 Year Warranty for the network cabling o Provide removal/demo of existing network cables and patch cables no longer in use Page: 7 of 25Quote #040837 v1
702
9910 Irvine Center Drive | Irvine | CA | 92618
www.bcsconsultants.com | (949) 333-1000
Method of Approach
After review of the project, the site bid walk through and from our previous experience working in the City buildings we'd like to propose the following implementation plan. This approach can be coordinated to be adjusted as needed. Each step within this approach will include each Stage for consideration and based upon what the City agrees to.
Project Kickoff: Meeting with the City to discuss the project including but not limited to Building Priorities, Network Cabling, Schedule, Funding Approval, Review of City existing plans o Product Data Submittals will be provided to include cut sheets on all products proposed for City review
o BCS will provide a digital shared drive to document storage for plans, test reports, meeting notes, progress photos and additional documentation for the project o Identify Project Contacts for City to coordinate access to all buildings Predesign Coordination:
o BCS to use existing City provided plans to develop preliminary schematic base floor plans o Preliminary Schedule to be created based of kick off meeting Detailed Design/Review:
o BCS will schedule initial building surveys to verify floor plans for detailed design plans, adjustments to plans, gather visible network cabling requirements for each site and to obtain preliminary infrastructure assessment information.
o The completed detailed design plan and assessment for each building will be provided to the City for review.
o BCS will coordinate a meeting, conference call, or approval walk through to BCS PM, City IT Dept. and any additional City Personnel that may be required to determine final requirements.
Installation:
o Site installation schedule to be coordinated with priorities to be determined with City IT Personnel. The following we understand is a list of priority, but will provide separate project teams as needed to execute with diligence.
Verkada Camera Installation
Fiber Backbone Installation
CAT6A Upgrade
EOC
o Technician site kick off
o QA walk throughs of each site in progress weekly
o Progress/Coordination meetings and progress reports weekly for City o Additional coordination daily/weekly as Cameras are brought online for the Police Dept/Comm installation to verify FoV approval
o Asbuilts and test results will be provided for each building as they are completed o Final walk through for sign off of each site with City o Project Closeout Manuals provided on all building plans both electronic and hard copies Page: 8 of 25Quote #040837 v1
703
9910 Irvine Center Drive | Irvine | CA | 92618
www.bcsconsultants.com | (949) 333-1000
Qualifications & Experience
General Company information
Company name: Afsaneh Enterprises, Inc. dba BCS Consultants (BCS) Address since 2008: 9910 Irvine Center Drive, Irvine, CA 92618 Phone number: (949) 333-1000, Fax number: (949) 333-1001 Website: www.bcsconsultants.com
Firm Background & Licensing:
Established: 2001 S. Corporation, Federal Tax ID#: 33-0985618 Afsaneh Rajab, Chairman, Secretary, Treasurer
Special company classifications: SWBE (100% woman-owned) California contractor’s license number: C7, C28 # 852163, Expires 1/31/25 California Alarm License - ACO7989
Costa Mesa Business License #RCON-23-0921, Expires 10/31/25 CMAS Approved File #20216606065
Community & Charitable Contributions
o https://www.bcsconsultants.com/about/community/
Personnel & bid contacts.
Account Contact:
o Sunny Rajab (email: [email protected], direct: 949-333-1007) Project Contact:
o William Lowden ([email protected], , direct: 949-333-1041) Accounting Contact:
o Sarah Sheldon (email: [email protected], direct: 949-333-1005) Page: 9 of 25Quote #040837 v1
704
9910 Irvine Center Drive | Irvine | CA | 92618
www.bcsconsultants.com | (949) 333-1000
Qualifications & Experience
Page: 10 of 25Quote #040837 v1
705
9910 Irvine Center Drive | Irvine | CA | 92618
www.bcsconsultants.com | (949) 333-1000
Qualifications & Experience
Page: 11 of 25Quote #040837 v1
706
9910 Irvine Center Drive | Irvine | CA | 92618
www.bcsconsultants.com | (949) 333-1000
Key Personnel
Page: 12 of 25Quote #040837 v1
707
9910 Irvine Center Drive | Irvine | CA | 92618
www.bcsconsultants.com | (949) 333-1000
Key Personnel
Page: 13 of 25Quote #040837 v1
708
9910 Irvine Center Drive | Irvine | CA | 92618
www.bcsconsultants.com | (949) 333-1000
Key Personnel
Page: 14 of 25Quote #040837 v1
709
9910 Irvine Center Drive | Irvine | CA | 92618
www.bcsconsultants.com | (949) 333-1000
Additional Forms
Page: 15 of 25Quote #040837 v1
710
9910 Irvine Center Drive | Irvine | CA | 92618
www.bcsconsultants.com | (949) 333-1000
Additional Forms
Page: 16 of 25Quote #040837 v1
711
9910 Irvine Center Drive | Irvine | CA | 92618
www.bcsconsultants.com | (949) 333-1000
Additional Forms
Page: 17 of 25Quote #040837 v1
712
9910 Irvine Center Drive | Irvine | CA | 92618
www.bcsconsultants.com | (949) 333-1000
Additional Forms
Page: 18 of 25Quote #040837 v1
713
9910 Irvine Center Drive | Irvine | CA | 92618
www.bcsconsultants.com | (949) 333-1000
Additional Forms
Page: 19 of 25Quote #040837 v1
714
9910 Irvine Center Drive | Irvine | CA | 92618
www.bcsconsultants.com | (949) 333-1000
Stage 1 Labor Cost Proposal
Product Details Qty
Installation Labor/Equip 1
PM/Engineering/Design Services 1
Admin 1
Subtotal: $262,500.00
Stage 1 Materials Cost Proposal
Product Details Qty
Category 6A, White 10 MTP 260
Cat 6A Jack Module, White 1500
2 Port White Wall Plates 600
4 Port White Wall Plates 50
2 Port Surface Mount Box 200
Blank insert - white 100
24-Port Black Flat Flush Mount Modular Patch Panel 65
Cat 6A Jack Module, White 1500
5' Cat 6A White 28AWG UTP Patch Cable 1500
24" Straight Rod, EC, 90Deg Foot, 1-1/4" PA Pin 1000
3/4" JHook Supports 500
2" JHook Supports 500
3/4 in velcro black fire rated 25 yds. plenum 20
Misc Materials 1
Subtotal: $271,422.24
Page: 20 of 25Quote #040837 v1
715
9910 Irvine Center Drive | Irvine | CA | 92618
www.bcsconsultants.com | (949) 333-1000
Stage 2 Labor Cost Proposal
Product Details Qty
Labor/Equip 1
PM/Engineering/Design Services 1
Admin 1
Subtotal: $25,680.00
Stage 2 Materials Cost Proposal
Product Details Qty
Orange Plenum Cat 6 UTP Cable 7
Black OSP Cat 6 UTP Cable 4
24-Port Black Flat Flush Mount Modular Patch Panel 2
Cat6 Jack Panel Modules - Yellow 35
Cat6 Jack Consol. Pt Modules - Yellow 20
8 Cond Mod 22/24 AWG Solid Connectors 1
Longspan Base 10/100 PoE Extender 6
75" 4K 3840X2160 UHD Commercial Display 1
43" 4K 3840X2160 UHD, Commercial Display 2
Ceiling/Wall Mounts and HDMI Cables 3
5' Cat6 Orange 28AWG Patch Cable 35
Verkada Viewing Station 3
Verkada Viewing Station License 3
Verkada All-In-One Video Intercom 1
Verkada Intercom License 1
Subtotal: $23,643.47
Page: 21 of 25Quote #040837 v1
716
9910 Irvine Center Drive | Irvine | CA | 92618
www.bcsconsultants.com | (949) 333-1000
Stage 3 Labor Cost Proposal
Product Details Qty
Labor 1
PM/Engineering/Design Services 1
Admin 1
Subtotal: $64,375.00
Stage 3 Materials Cost Proposal
Product Details Qty
12-Fiber Singlemode OS2 Tight-Buffer Plenum Fiber Optic Cable 3000 12-Fiber Singlemode FrdmO TB Indoor/Outdoor Plenum 4000 24-Fiber Singlemode FrdmO TB Indoor/Outdoor Plenum 1000 1U Connector Housing F/2 Panels 15
2U Connector Housing F/4 Panels 7
4U Connector Housing F/12 Panels 2
12-Fiber LC OS2 Duplex Pigtailed Splice Cassette Housing 30 24-Fiber LC OS2 Duplex Pigtailed Splice Cassette Housing 6 1-1/4" Corrugated Flexible Duct 100
1" Corrugated Flexible Duct 1200
Misc. Materials 1
2M Fiber Patch Cables, LC to LC, Duplex, Yellow, Singlemode 100 Subtotal: $50,743.14
Page: 22 of 25Quote #040837 v1
717
9910 Irvine Center Drive | Irvine | CA | 92618
www.bcsconsultants.com | (949) 333-1000
Stage 4 Labor Cost Proposal
Product Details Qty
Labor 1
PM/Engineering/Design Services 1
Admin 1
Subtotal: $22,250.00
Stage 4 Materials Cost Proposal
Product Details Qty
Stage 4 Materials
Category 6A, White 10 MTP 14
Cat 6A Jack Module, White 160
2 Port White Wall Plates 40
4 Port White Wall Plates 5
2 Port Surface Mount Box 5
Blank insert - white 50
24-Port Black Flat Flush Mount Modular Patch Panel 4
5' Cat 6A White 28AWG UTP Patch Cable 80
Subtotal: $15,764.73
Page: 23 of 25Quote #040837 v1
718
9910 Irvine Center Drive | Irvine | CA | 92618
www.bcsconsultants.com | (949) 333-1000
RFP 25-05 Enterprise Cabling, Cameras, Fiber, EOC
Prepared by: Prepared for: Quote Information:
BCS Consultants City of Costa Mesa Quote #: 040837
Sunny Rajab
(949) 333-1007
Fax (949) 333-1001
[email protected]
77 Fair Drive
Costa Mesa, CA 92626
Mike Fuentes
(714) 754-5310
[email protected]
Version: 1
Delivery Date: 03/10/2025
Expiration Date: 02/28/2025
Quote Summary
Description Amount
Stage 1 Labor Cost Proposal $262,500.00
Stage 1 Materials Cost Proposal $271,422.24
Stage 2 Labor Cost Proposal $25,680.00
Stage 2 Materials Cost Proposal $23,643.47
Stage 3 Labor Cost Proposal $64,375.00
Stage 3 Materials Cost Proposal $50,743.14
Stage 4 Labor Cost Proposal $22,250.00
Stage 4 Materials Cost Proposal $15,764.73
Subtotal: $736,378.58
Estimated Tax: $6,924.22
Total: $743,302.80
Taxes, shipping, handling and other fees may apply. We reserve the right to cancel orders arising from pricing or other errors.
BCS Consultants City of Costa Mesa
Signature:
Name: Sunny Rajab
Title: CEO
Date: 03/10/2025
Signature:
Name: Mike Fuentes
Date:
Page: 24 of 25Quote #040837 v1
719
9910 Irvine Center Drive | Irvine | CA | 92618
www.bcsconsultants.com | (949) 333-1000
Standard Labor Rates
1. Single Mode Fiber install for indoor use.
o Labor Cost per foot installed: $10 per foot
2. Single Mode Fiber install for Outdoor use in existing conduit o Labor Cost per foot installed: $15 per foot
3. CAT6A network drop install for indoor use.
o Labor Cost per foot installed: $5 per foot
4. Verkada camera install and Cat6 Enhanced network drop install for indoor use. o Labor Cost per foot installed: $10 per foot
5. Verkada camera install and Cat6 Enhanced network drop install for outdoor use. o Labor Cost per foot installed: $15 per foot
Page: 25 of 25Quote #040837 v1
720
CITY OF COSTA MESA
Agenda Report
77 Fair Drive
Costa Mesa, CA 92626
File #: 25-417 Meeting Date: 9/2/2025
TITLE:
REQUEST FOR CITY COUNCIL DIRECTION REGARDING THE RESULTS OF THE ORANGE
COUNTY POWER AUTHORITY (OCPA) FEASIBILITY STUDY
DEPARTMENT: CITY MANAGER’S OFFICE
PRESENTED BY: CECILIA GALLARDO-DALY, INTERIM CITY MANAGER CONTACT INFORMATION: HADASSA JAKHER, 714-754-4885,
[email protected]
RECOMMENDATION:
Staff is requesting that the City Council:
1. Receive and file the feasibility study conducted by the Orange County Power Authority (OCPA) and the corresponding presentation led by OCPA;
2. Provide direction on the substantial staff research required to evaluate joining OCPA; and
3. Direct staff to identify available funding for any costs associated with Costa Mesa’spotential membership in OCPA.
BACKGROUND:
The City of Costa Mesa previously considered joining the Orange County Power Authority (OCPA) in early 2020. After much deliberation, at the regular City Council meeting on November 17, 2020, the City Council voted to have the City Manager and City Attorney negotiate the final terms of the agreement with OCPA. However, due to the precedence of the COVID-19 pandemic and the leadership structure of the OCPA at the time, the City did not execute an agreement with OCPA.
In early 2024, representatives from OCPA and several Council Members requested the reconsideration of an agreement between the City of Costa Mesa and OCPA, given the experience gained by OCPA over the years since its inception. At the regular City Council meeting on July 16, 2024, the City Council approved OCPA to access Costa Mesa’s electrical load data in order to conduct a feasibility study for the City’spotential membership in OCPA. Additionally, the City Council directed OCPA to present the results of the study to the Finance and Pension Advisory Committee (FIPAC).
The feasibility study conducted by OCPA analyzed the historical load consumption data of Southern California Edison (SCE) customers within Costa Mesa, including a prospective outlook for users in Costa Mesa. Current OCPA rates for residential and commercial customers are included for reference, as well as OCPA’sFiscal Year 2025-26 Operating Budget. In mid-2025, OCPA staff met
721
File #: 25-417 Meeting Date: 9/2/2025
reference, as well as OCPA’sFiscal Year 2025-26 Operating Budget. In mid-2025, OCPA staff met with City staff and Council Members Marr and Reynolds to discuss the feasibility study and an estimated timeline of Costa Mesa’s potential membership in OCPA.
OCPA will present the results of the feasibility study at the September 2, 2025, regular City Council meeting.
ANALYSIS:
With the completion of OCPA’s feasibility study, staff must conduct thorough due diligence and substantial research to determine the effects of Costa Mesa’s potential membership in OCPA.
Therefore, staff is requesting that the City Council provide further direction, in accordance with City Council Policy 300-6.
According to City Council Policy 300-6, proposals with substantial research must be brought forward to the full City Council for formal consideration. To assess the impacts of OCPA membership to the City of Costa Mesa and its residents and businesses, staff would need to conduct substantial research in the following areas:
· An independent, third-party review of OCPA’sfeasibility study, including, but not limited to, an analysis of OCPA’soperating budget, proposed rate structure, and the risks and benefits to the City and to prospective users.
· An analysis of the staff resources required in order to support the City’s membership in OCPA, including, but not limited to, a dedicated City staff member to act as a project manager with OCPA to liaise with the preparation and launch of the program in Costa Mesa, a comprehensive public education plan suitable for all demographics, and any ongoing administrative needs.
· An analysis of the funding required, including, but not limited to, the costs of the independent third-party review, the costs associated with a public education plan and campaign throughout the city, and any ongoing administrative costs.
· A review of the rate of success of the program implemented in surrounding member cities of OCPA, including an assessment of surrounding cities that have considered/are considering joining OCPA.
Upon completion of the research, staff would provide recommendations to the City Council regarding potential membership in OCPA, which would include:
· The final feasibility study conducted by OCPA, including documents not yet received from OCPA, such as a three-to-five-year rate trajectory for user rates; · The results of an independent, third-party review of OCPA’s feasibility study; · Identification of the staff member(s) that will assist in liaising with OCPA and the roll out of the program;
· A request to appropriate the necessary funds to cover any associated costs of substantial
722
File #: 25-417 Meeting Date: 9/2/2025
· A request to appropriate the necessary funds to cover any associated costs of substantial research and program implementation;
· The results of the review of rate of success in surrounding cities; and · Any recommendations provided by FIPAC, as directed by the City Council at the July 16, 2024, meeting.
The substantial staff research conducted would provide the City Council with all the requisite materials necessary to be informed and prepared to consider Costa Mesa’s membership with OCPA.
ALTERNATIVES:
The City Council may provide alternative direction to staff on the substantial staff research required to consider joining OCPA.
FISCAL REVIEW:
There is no fiscal impact with this action, however, should City Council provide direction to proceed with the third-party review, staff would identify an available funding source and request authority to appropriate funds.
A full fiscal impact analysis to the City of Costa Mesa’sbudget will be provided upon further direction by the City Council should they wish to explore the utilization of a third-party reviewer. Funding for the review of OCPA’sfeasibility study was initially budgeted in the Citywide Community Choice Energy project in the Capital Improvement Fund (Fund 401); however, these funds were deferred in Fiscal Year 2024-25.
LEGAL REVIEW:
The City Attorney’s Office has reviewed this report and approved it as to form.
CITY COUNCIL GOALS AND PRIORITIES:
This item supports the following City Council Goal:
· Advance environmental sustainability and climate resiliency.
CONCLUSION:
The City Council has previously considered joining the Orange County Power Authority. Currently, OCPA has conducted a feasibility analysis based on SCE load data. The City Council may direct staff to evaluate the feasibility study with a third-party reviewer prior to determining whether to join OCPA.
723
Orange County Power Authority - Costa Mesa Feasibility Study
EXECUTIVE SUMMARY
In July 2024, the Orange County Power Authority (OCPA) presented to the Costa Mesa City Council. At that meeting, the Council authorized the City Manager to release the City’s electric load data to OCPA for the purpose of conducting a feasibility study.
OCPA engaged Pacific Energy Advisors (PEA) to conduct an independent analysis evaluating the financial implications of the City joining OCPA. The results of the study were presented to Costa Mesa staff on May 21, 2025.
Based on the study’s assumptions, the outlook for the City’s potential membership is favorable.
A prospective launch in March 2027 is projected to yield a net positive outcome for OCPA. The study anticipates that approximately 46,000 new customer accounts in Costa Mesa would be served by OCPA, with an estimated 90% enrolling in the Smart Choice rate plan—which offers approximately 76% renewable energy content at an added cost of 1.0 cent per kWh above the Basic Choice rate in 2025. The remaining 10% are expected to choose the 100% Renewable Choice plan, which provides full renewable content at an additional cost of 1.5 cents per kWh over the Basic Choice rate.
ANALYSIS
The Community Choice Aggregation (CCA) program has been available in California since 2002, following the passage of Assembly Bill 117. This program provides an alternative to the traditional Investor-Owned Utility (IOU) model by enabling local governments to manage their own energy procurement. Through CCA, participating agencies can purchase electricity, set generation rates, and reinvest revenue locally. As of today, there are 25 operational CCAs in California, including the Orange County Power Authority (OCPA), collectively serving over 14 million customers across more than 200 cities and counties.
To assess the financial viability of membership, OCPA engaged Pacific Energy Advisors (PEA) to conduct an independent feasibility study. The results of the study will be presented to the OCPA Board in September 2025. At that time, the Board will consider whether to formally invite the City to join OCPA and initiate collaboration on the necessary steps for membership integration.
PEA acquired and analyzed the City's 2024 historical annual load consumption data from SCE, which is the most up-to-date information available, to conduct the Study. As of August 2024, there are approximately 50,600 eligible customer accounts within the City, with energy consumption of 33% for residential and 67% for commercial customers.
The Study was based on several key assumptions:
Attachment 1
724
• Customer Enrollment Timeline: Customer enrollment is projected to begin in March 2027, in alignment with California Public Utilities Commission (CPUC) regulations for CCA expansion. March was selected to allow adequate time for community outreach following the holiday season and to avoid the higher costs and volatility typically seen during the summer months (June through September).
• Customer Participation: The study assumes a 10% opt-out rate for eligible residential customers and a 5% opt-out rate for eligible commercial customers. Streetlight and traffic control accounts, which are primarily municipal, are expected to be fully enrolled. • Eligible Customer Accounts and Load: After applying opt-out assumptions, approximately 46,000 customer accounts are projected to enroll in OCPA, contributing an estimated annual electric load of 600 GWh. This would represent a 27% increase in OCPA’s existing customer load.
• OCPA Rate Plan Enrollment: It is assumed that 90% of enrolled customers will choose the OCPA Smart Choice rate plan, which provides approximately 76% renewable energy content and includes an additional charge of 1.0 cent per kWh over the Basic Choice rate (as of 2025). The remaining 10% are expected to opt for the 100% Renewable Choice plan, which adds 1.5 cents per kWh over the Basic Choice rate. • OCPA Incremental Revenues: Revenue projections are based on cost-of-service rates, with the expectation that OCPA will annually adjust its rates to meet revenue requirements.
• OCPA Incremental Costs: The anticipated 27% increase in load will result in additional costs, including power procurement at prevailing market rates, SCE service fees, data management charges, and marketing and outreach expenses.
Estimated Incremental Revenues and Operating Margin
For the initial partial fiscal year (FY2026/27, covering October 2026 through June 2027), incremental revenue is projected to be approximately $19 million, with an estimated operating margin of $6.8 million. For the full fiscal years FY2027/28 through FY2029/30, average annual incremental revenue is projected at $77.1 million, with an average operating margin of $12.3 million.
It is important to note that these projections represent the estimated incremental impact of adding Costa Mesa customers to the OCPA service base. However, OCPA’s financial model is based on a pooled, agency-wide approach, in which revenues and expenses from all participating jurisdictions are aggregated and managed collectively. As such, these incremental revenues and margins are not separately allocated or reserved for the City of Costa Mesa, nor are they treated as discrete financial gains for any individual member agency.
This shared structure supports rate stability, operational efficiency, and collective investment in programs that benefit all members. While the addition of Costa Mesa is expected to generate a net positive impact on OCPA’s overall financial performance, the resulting margin will contribute to the agency’s general fund and support the long-term sustainability of services across all member agencies.
725
A detailed overview of the fiscal impact—including projected incremental revenues, operating expenses, and operating margins for FY2026/27 through FY2029/30—is provided in Attachment
1. These projections, calculated on a load-weighted basis, account for energy procurement, staffing, marketing, outreach, SCE service fees, data management, reserves, and other operational costs.
Prospective Outlook
Based on the assumptions in the feasibility study, the outlook for the City of Costa Mesa joining OCPA is currently positive. A prospective launch in March 2027 is projected to result in a net financial benefit for OCPA.
However, OCPA staff emphasizes that California’s energy markets are inherently volatile, with prices subject to rapid fluctuations. As a result, the study’s projections may change depending on market conditions at the time of implementation.
Beyond the financial outlook, there are several strategic and environmental benefits to the City’s potential participation. Joining OCPA would:
• Expand the agency’s membership base,
• Support regional progress toward increased renewable energy adoption and reduced greenhouse gas emissions, and
• Enhance customer choice and local control over energy procurement and rate setting.
These benefits align with broader sustainability goals while offering Costa Mesa the opportunity to play an active role in shaping a cleaner, more resilient energy future.
OCPA Renewable Energy Content for OCPA Smart Choice Customers In 2025, OCPA's Smart Choice plan offers 55% renewable energy plus 40% carbon free content, exceeding SCE's 2024 default basic product renewable energy content by 17%. OCPA's Basic Choice plan and 100% Renewable Choice plan offer 47% and 100% renewable energy content, respectively. SCE customers who wish to receive service with higher renewable content must opt into SCE's Green Tariff Shared Renewables program (Green Rate Program), which is currently closed to new customers. Out of approximately 5,000,000 accounts in the entire SCE service area, only about 3,000 accounts are currently enrolled in the SCE Green Rate Program.
Joining OCPA provides the City of Costa Mesa with a unique opportunity to take control of its energy choices while delivering substantial benefits to the community. As a public, community- driven agency, OCPA empowers customers to select their energy sources, including options that are more affordable or sustainable. For its existing member agencies, OCPA currently offers a 3% discount compared to SCE's equivalent generation rate on the Basic Choice plan, which customers have enjoyed approximately $2.6 million in on-bill savings since its inception. The exact savings for the City customers who choose to opt-down to Basic Choice will vary based on its rate classification and energy usage. Unlike traditional utilities, OCPA reinvests profits 726
locally, supporting economic growth and funding programs that help reduce energy costs, lower consumption, and enhance reliability. By joining OCPA, the City can play a pivotal role in shaping a cleaner, more affordable energy future while advocating for local control at the state level.
OCPA Renewable Energy Content for Smart Choice Customers In 2025, OCPA’s Smart Choice plan offers a power mix consisting of 55% renewable energy and 40% carbon-free content, exceeding SCE’s 2024 default product by 17% in clean energy content.
OCPA also offers two additional rate plans:
• Basic Choice: 47% renewable content
• 100% Renewable Choice: 100% renewable content
By contrast, SCE customers seeking higher renewable content must enroll in the Green Tariff Shared Renewables program (Green Rate Program)—a limited opt-in offering that is currently closed to new participants. As of now, only approximately 3,000 out of 5 million SCE accounts are enrolled in this program.
Joining OCPA would provide the City of Costa Mesa with a unique opportunity to gain local control over energy choices while delivering meaningful benefits to its residents and businesses.
As a public, community-focused agency, OCPA empowers customers to choose energy options that are more affordable, sustainable, or both.
For example, OCPA’s Basic Choice plan currently offers an estimated 3% discount compared to SCE’s equivalent generation rate. Since launch, customers across existing member agencies have realized approximately $2.6 million in on-bill savings. Actual savings for Costa Mesa customers who select Basic Choice will depend on rate classification and individual usage.
Unlike traditional investor-owned utilities, OCPA reinvests revenues locally, supporting economic development and funding programs that help reduce energy costs, promote energy efficiency, and improve system reliability.
By joining OCPA, the City of Costa Mesa can play a leading role in advancing a cleaner, more cost-effective, and locally governed energy future, while ensuring that its community has a voice in statewide energy policy decisions.
Next Steps
In accordance with the OCPA Joint Powers Agreement (JPA) and the California Public Utilities Code, the City of Costa Mesa must complete the following actions to formally join OCPA:
1. Adopt an ordinance authorizing implementation of OCPA’s Community Choice Aggregation (CCA) program within City boundaries.
2. Adopt a resolution expressing the City’s intent to join OCPA and approving the OCPA JPA Agreement.
727
Following these actions, OCPA staff will prepare an Amended Implementation Plan for consideration by the OCPA Board at a public hearing, anticipated to occur in November or December 2025 (see attached proposed onboarding timeline, Version 1 or 2). To remain on track for a 2027 launch, the amended plan must be submitted to the California Public Utilities Commission (CPUC) for certification no later than December 31, 2025.
As part of the membership process, OCPA is required to provide a minimum of 30 days’ written notice to its current Member agencies, notifying them that the Board will be considering the City’s membership. This notice must include all substantive materials necessary to support informed deliberation.
Finally, approval of the City’s membership is subject to a two-thirds supermajority vote of the OCPA Board, as specified in the JPA Agreement.
APPENDIX
Figure 1 – Feasibility Projections
728
FYE 27 FYE 28 FYE 29 FYE 30 FY 2027 2028 2029 2030
FY 2027 2028 2029 2030 Rate Adjustment (to current 2025) 17% 12% 16% 16% Pro Forma Margin (Omits Financing) ‐17% ‐12% ‐16% ‐16%
Base Rate Revenue 16,097,307$ 68,760,582$ 71,342,862$ 71,963,959$ Product 2 Premium 2,516,662$ 5,405,726$ 5,446,810$ 5,488,206$ Basic Choice Enrollment 0% Product 3 Premium 419,444$ 900,954$ 907,802$ 914,701$ Smart Choice Enrollment 90% 100% Renewable Enrollment 10%
Total Revenues 19,033,413$ 75,067,263$ 77,697,474$ 78,366,866$ Product 2 Rev Premium 10.00 $
Cost of Load 2,777,851$ 29,525,691$ 30,069,421$ 30,522,993$ Product 3 Rev Premium 15.00 $ RA 2,146,041$ 15,439,268$ 15,556,606$ 15,674,836$ PCC1 2,523,586$ 10,811,566$ 10,572,514$ 10,809,899$ Data Management ($/MWh) 0.94 $ PCC2 ‐$
‐$ ‐$ ‐$
PCC3 30,668$ 136,705$ 140,129$ 143,591$ IOU Service Fees ($/Account/mo.) 1.25 $ CAISO Non‐Energy 271,733$ 1,201,273$ 1,210,402$ 1,219,601$ Uncollectibles/Other (% of Rev) 1.3%
Total Power Supply Costs 7,749,878$ 57,114,503$ 57,549,071$ 58,370,920$ Staff 1,415,729 $ 1,415,729$ 1,415,729$ 1,415,729$ Marketing and Customer Enrollment 536,116$ 536,116$ 536,116$ 536,116$ Other Operating Expenses 1,262,974$ 1,262,974$ 1,262,974$ 1,262,974$ Data Management 262,851$ 564,598$ 568,889$ 573,213$ IOU Service Fees 349,801$ 704,918$ 710,276$ 715,674$ Uncollectibles/Other 247,434$ 975,874$ 1,010,067$ 1,018,769$ Reserve Requirement 380,668$ 1,501,345$ 1,553,949$ 1,567,337$ Total Other Operating Costs 4,455,575$ 6,961,556$ 7,058,002$ 7,089,813$ Total Cost 12,205,453$ 64,076,059$ 64,607,073$ 65,460,733$ Net Operating Margin 6,827,960$ 10,991,204$ 13,090,401$ 12,906,132$ Total Accounts 46,640 46,995 47,352 47,712 Total
Sales (MWh) 279,629 600,636 605,201 609,801 2,095,267 Avg. Rev ($/MWh 68.07$ 124.98$ 128.38$ 128.51$ 119.40$ Avg. Total Cost ($/MWh)
43.65$ 106.68$ 106.75$ 107.35$ 98.48$ Avg. Margin ($/MWh) 24.42$ 18.30$ 21.63$ 21.16$ 20.91$ 36% 15% 17% 16% 18%
Avg. Cost of Load ($/MWh) 9.93$ 49.16$ 49.69$ 50.05$ Avg. RA ($/MWh) 7.67$ 25.70$ 25.70$ 25.70$
Avg. RE ($/MWh) 9.13$ 18.23$ 17.70$ 17.96$
30% Power cost high 2$ 17$ 17$ 17$
30% Power cost low 2$ 17$ 17$ 17$
Op Margin 6.83$ 10.99$ 13.09$ 12.91$
Low margin 4.58$ (5.78)$ (3.81)$ (4.24)$
High Margin 9.07$ 27.77$ 29.99$ 30.05$
$(10)
$(5)
$‐
$5
$10
$15
$20
$25
$30
$35
FYE 27 FYE 28 FYE 29 FYE 30
Change in Operating Margin ($MM)
Figure 1 - Feasibility Projections
729
Effective: Mar 24, 2025
OCPA Rate Schedule Period Basic Choice Smart Choice
100% Renewable
Choice Time Period Definitions
TOU-GS-1-D Summer - June through September; Winter - October through May GENERATION CHARGE ($/KWH) SUMMER ON-PEAK 0.11273$ 0.12273$ 0.12773$ 4pm - 9pm, Monday - Friday SUMMER MID-PEAK 0.10269$ 0.11269$ 0.11769$ 4pm - 9pm, Saturday, Sunday, & holidays* SUMMER OFF-PEAK 0.07046$ 0.08046$ 0.08546$ 9pm - 4pm, every day WINTER MID-PEAK 0.10664$ 0.11664$ 0.12164$ 4pm - 9pm, every day WINTER OFF-PEAK 0.07799$ 0.08799$ 0.09299$ 9pm - 8am, every day WINTER SUPER OFF-PEAK 0.06067$ 0.07067$ 0.07567$ 8am - 4pm, every day
YEAR ROUND VOLTAGE DISCOUNT -
ENERGY 2-50kV ($/kWh) (0.00042)$ (0.00042)$ (0.00042)$ All electric usage
YEAR ROUND VOLTAGE DISCOUNT -
ENERGY 51-219kV ($/kWh) (0.00080)$ (0.00080)$ (0.00080)$ All electric usage
YEAR ROUND VOLTAGE DISCOUNT -
ENERGY 220kV ($/kWh) (0.00083)$ (0.00083)$ (0.00083)$ All electric usage DEMAND CHARGE ($/KW) SUMMER ON-PEAK 14.59$ 14.59$ 14.59 $
4pm - 9pm, Monday - Friday
WINTER MID-PEAK 4.48$ 4.48$ 4.48$ 4pm - 9pm, Monday - Friday
SUMMER ON-PEAK AND WINTER MID-
PEAK (WEEKDAYS) VOLTAGE DISCOUNT -
DEMAND 2-50kV ($/kW)
(0.19)$ (0.19)$ (0.19)
$
4pm - 9pm, Monday - Friday
SUMMER ON-PEAK AND WINTER MID-
PEAK (WEEKDAYS) VOLTAGE DISCOUNT -
DEMAND 51-219kV ($/kW)
(0.45)$ (0.45)$ (0.45)
$
4pm - 9pm, Monday - Friday
SUMMER ON-PEAK AND WINTER MID-
PEAK (WEEKDAYS) VOLTAGE DISCOUNT -
DEMAND 220kV ($/kW)
(0.45)$ (0.45)$ (0.45)
$
4pm - 9pm, Monday - Friday
TOU-GS-1-E Summer - June through September; Winter - October through May GENERATION CHARGE ($/KWH) SUMMER ON-PEAK 0.39535$ 0.40535$ 0.41035$ 4pm - 9pm, Monday - Friday SUMMER MID-PEAK 0.11200$ 0.12200$ 0.12700$ 4pm - 9pm, Saturday, Sunday, & holidays* SUMMER OFF-PEAK 0.08268$ 0.09268$ 0.09768$ 9pm - 4pm, every day WINTER MID-PEAK 0.16522$ 0.17522$ 0.18022$ 4pm - 9pm, every day WINTER OFF-PEAK 0.09586$ 0.10586$ 0.11086$ 9pm - 8am, every day WINTER SUPER OFF-PEAK 0.05468$ 0.06468$ 0.06968$ 8am - 4pm, every day
YEAR ROUND VOLTAGE DISCOUNT -
ENERGY 2-50kV ($/kWh) (0.00117)$ (0.00117)$
(0.00117)$ All electric usage
YEAR ROUND VOLTAGE DISCOUNT -
ENERGY 51-219kV ($/kWh) (0.00254)$ (0.00254)$ (0.00254)$ All electric usage
YEAR ROUND VOLTAGE DISCOUNT -
ENERGY 220kV ($/kWh) (0.00258)$ (0.00258)$ (0.00258)$ All electric usage TOU-GS-1-ES Summer - June through September; Winter - October through May GENERATION CHARGE ($/KWH) SUMMER ON-PEAK 0.42065$ 0.43065$ 0.43565$ 4pm - 9pm, Monday - Friday SUMMER MID-PEAK 0.12177$ 0.13177$ 0.13677$ 4pm - 9pm, Saturday, Sunday, & holidays* SUMMER OFF-PEAK 0.08712$ 0.09712$ 0.10212$ 9pm - 4pm, every day WINTER MID-PEAK 0.15865$ 0.16865$ 0.17365$ 4pm - 9pm, every day WINTER OFF-PEAK 0.09011$ 0.10011$ 0.10511$ 9pm - 8am, every day WINTER SUPER OFF-PEAK 0.05199$ 0.06199$ 0.06699$ 8am - 4pm, every day
YEAR ROUND VOLTAGE DISCOUNT -
ENERGY 2-50kV ($/kWh) (0.00116)$ (0.00116)$ (0.00116)$ All electric usage
YEAR ROUND VOLTAGE DISCOUNT -
ENERGY 51-219kV ($/kWh) (0.00254)$ (0.00254)$ (0.00254)$ All electric usage
YEAR ROUND VOLTAGE DISCOUNT -
ENERGY 220kV ($/kWh) (0.00258)$ (0.00258)$ (0.00258)$ All electric usage TOU-GS-1-A Summer - June through September; Winter - October through May GENERATION CHARGE ($/KWH) SUMMER ON-PEAK 0.14775$ 0.15775$ 0.16275$ 12pm - 6pm, Monday - Friday SUMMER MID-PEAK 0.13879$ 0.14879$ 0.15379$ 8am - 12pm & 6pm - 11pm, Monday - Friday SUMMER OFF-PEAK 0.13390$ 0.14390$ 0.14890$ All other hours WINTER MID-PEAK 0.10115$ 0.11115$ 0.11615$ 8am - 9pm, Monday - Friday WINTER OFF-PEAK 0.09195$ 0.10195$ 0.10695$ All other hours TOU-GS-1-B Summer - June through September; Winter - October through May GENERATION CHARGE ($/KWH) SUMMER ON-PEAK 0.08475$ 0.09475$ 0.09975$ 12pm - 6pm, Monday - Friday SUMMER MID-PEAK 0.07987$ 0.08987$ 0.09487$ 8am - 12pm & 6pm - 11pm, Monday - Friday SUMMER OFF-PEAK 0.07720$ 0.08720$ 0.09220$ All other hours WINTER MID-PEAK 0.10115$ 0.11115$ 0.11615$ 8am - 9pm, Monday - Friday WINTER OFF-PEAK 0.09195$ 0.10195$ 0.10695$ All other hours DEMAND CHARGE ($/KW)
SUMMER ON-PEAK 10.71$ 10.71$ 10.71$ 12pm - 6pm, Monday - Friday
COMMERCIAL CUSTOMERS
Attachment 2
730
Effective: Mar 24, 2025
OCPA Rate Schedule Period Basic Choice Smart Choice
100% Renewable
Choice Time Period Definitions
COMMERCIAL CUSTOMERS
SUMMER MID-PEAK 3.48 $ 3.48 $ 3.48 $ 8am - 12pm & 6pm - 11pm, Monday - Friday 731
Effective: Mar 24, 2025
OCPA Rate Schedule Period Basic Choice Smart Choice
100% Renewable
Choice Time Period Definitions
COMMERCIAL CUSTOMERS
TOU-GS-2-D Summer - June through September; Winter - October through May GENERATION CHARGE ($/KWH) SUMMER ON-PEAK 0.10934 $ 0.11934 $ 0.12434 $ 4pm - 9pm, Monday - Friday SUMMER MID-PEAK 0.10054 $ 0.11054 $ 0.11554 $ 4pm - 9pm, Saturday, Sunday, & holidays* SUMMER OFF-PEAK 0.06796 $ 0.07796 $ 0.08296 $ 9pm - 4pm, every day WINTER MID-PEAK 0.07693 $ 0.08693 $ 0.09193 $ 4pm - 9pm, every day WINTER OFF-PEAK 0.07735 $ 0.08735 $ 0.09235 $ 9pm - 8am, every day WINTER SUPER OFF-PEAK 0.04518 $ 0.05518 $ 0.06018 $ 8am - 4pm, every day
YEAR ROUND VOLTAGE DISCOUNT -
ENERGY 2-50kV ($/kWh) (0.00081)$ (0.00081) $ (0.00081) $ All electric usage
YEAR ROUND VOLTAGE DISCOUNT -
ENERGY 51-219kV ($/kWh) (0.00180)$ (0.00180) $ (0.00180) $ All electric usage
YEAR ROUND VOLTAGE DISCOUNT -
ENERGY 220kV ($/kWh) (0.00182)$ (0.00182) $ (0.00182) $ All electric usage DEMAND CHARGE ($/KW) SUMMER ON-PEAK 18.51 $ 18.51 $ 18.51 $ 4pm - 9pm, Monday - Friday WINTER MID-PEAK 4.86 $ 4.86 $ 4.86 $ 4pm - 9pm, Monday - Friday
SUMMER ON-PEAK VOLTAGE DISCOUNT
-
DEMAND 2-50kV ($/kW) (0.42)$ (0.42) $ (0.42) $ 4pm - 9pm, Monday - Friday
SUMMER ON-PEAK VOLTAGE DISCOUNT -
DEMAND 51-219kV ($/kW) (0.97)$ (0.97) $ (0.97) $ 4pm - 9pm, Monday - Friday
SUMMER ON-PEAK VOLTAGE DISCOUNT -
DEMAND 220kV ($/kW) (0.98)$ (0.98) $ (0.98) $ 4pm - 9pm, Monday - Friday
WINTER MID-PEAK (WEEKDAYS)
VOLTAGE DISCOUNT - DEMAND 2-50kV
($/kW)
(0.10)$ (0.10) $ (0.10) $ 4pm - 9pm, Monday - Friday
WINTER MID-PEAK (WEEKDAYS)
VOLTAGE DISCOUNT - DEMAND 51-
219kV ($/kW)
(0.25)$ (0.25) $ (0.25) $ 4pm - 9pm, Monday - Friday
WINTER MID-PEAK (WEEKDAYS)
VOLTAGE DISCOUNT - DEMAND 220kV
($/kW)
(0.25)$ (0.25) $ (0.25) $ 4pm - 9pm, Monday - Friday TOU-GS-2-E Summer - June through September; Winter - October through May GENERATION CHARGE ($/KWH) SUMMER ON-PEAK 0.34584 $ 0.35584 $ 0.36084 $ 4pm - 9pm, Monday - Friday SUMMER MID-PEAK 0.10054 $ 0.11054 $ 0.11554 $ 4pm - 9pm, Saturday, Sunday, & holidays* SUMMER OFF-PEAK 0.06796 $ 0.07796 $ 0.08296 $ 9pm - 4pm, every day WINTER MID-PEAK 0.11460 $ 0.12460 $ 0.12960 $ 4pm - 9pm, every day WINTER OFF-PEAK 0.07735 $ 0.08735 $ 0.09235 $ 9pm - 8am, every day WINTER SUPER OFF-PEAK 0.04518 $ 0.05518 $ 0.06018 $ 8am - 4pm, every day
YEAR ROUND VOLTAGE DISCOUNT -
ENERGY 2-50kV ($/kWh) (0.00122)$ (0.00122) $ (0.00122) $ All electric usage
YEAR ROUND VOLTAGE DISCOUNT -
ENERGY 51-219kV ($/kWh) (0.00273)$ (0.00273) $ (0.00273) $ All electric usage
YEAR ROUND VOLTAGE DISCOUNT -
ENERGY 220kV ($/kWh) (0.00275)$ (0.00275) $ (0.00275) $ All electric usage DEMAND CHARGE ($/KW) SUMMER ON-PEAK 5.13 $ 5.13 $ 5.13 $ 4pm - 9pm, Monday - Friday WINTER MID-PEAK 1.99 $ 1.99 $ 1.99 $ 4pm - 9pm, Monday - Friday
SUMMER ON-PEAK VOLTAGE DISCOUNT
-
DEMAND 2-50kV ($/kW) (0.17)$ (0.17) $ (0.17) $ 4pm - 9pm, Monday - Friday
SUMMER ON-PEAK VOLTAGE DISCOUNT -
DEMAND 51-219kV ($/kW) (0.39)$ (0.39) $ (0.39) $ 4pm - 9pm, Monday - Friday
SUMMER ON-PEAK VOLTAGE DISCOUNT -
DEMAND 220kV ($/kW) (0.40)$ (0.40) $ (0.40) $ 4pm - 9pm, Monday - Friday
WINTER MID-PEAK (WEEKDAYS)
VOLTAGE DISCOUNT - DEMAND 2-50kV
($/kW)
(0.04)$ (0.04) $ (0.04) $ 4pm - 9pm, Monday - Friday
WINTER MID-PEAK (WEEKDAYS)
VOLTAGE DISCOUNT - DEMAND 51-
219kV ($/kW)
(0.11)$ (0.11) $ (0.11) $ 4pm - 9pm, Monday - Friday
WINTER MID-PEAK (WEEKDAYS)
VOLTAGE DISCOUNT - DEMAND 220kV
($/kW)
(0.11)$ (0.11) $ (0.11) $ 4pm - 9pm, Monday - Friday TOU-GS-2-B Summer - June through September; Winter - October through May GENERATION CHARGE ($/KWH) SUMMER ON-PEAK 0.08179 $ 0.09179 $ 0.09679 $ 12pm - 6pm, Monday - Friday 732
Effective: Mar 24, 2025
OCPA Rate Schedule Period Basic Choice Smart Choice
100% Renewable
Choice Time Period Definitions
COMMERCIAL CUSTOMERS
SUMMER MID-PEAK 0.07713 $ 0.08713 $ 0.09213 $ 8am - 12pm & 6pm - 11pm, Monday - Friday SUMMER OFF-PEAK 0.07458 $ 0.08458 $ 0.08958 $ All other hours WINTER MID-PEAK 0.09733 $ 0.10733 $ 0.11233 $ 8am - 9pm, Monday - Friday WINTER OFF-PEAK 0.06143 $ 0.07143 $ 0.07643 $ All other hours DEMAND CHARGE ($/KW) SUMMER ON-PEAK 12.83 $ 12.83 $ 12.83 $ 12pm - 6pm, Monday - Friday SUMMER MID-PEAK 4.31 $ 4.31 $ 4.31 $ 8am - 12pm & 6pm - 11pm, Monday - Friday TOU-GS-2-R Summer - June through September; Winter - October through May GENERATION CHARGE ($/KWH) SUMMER ON-PEAK 0.25127 $ 0.26127 $ 0.26627 $ 12pm - 6pm, Monday - Friday SUMMER MID-PEAK 0.12445 $ 0.13445 $ 0.13945 $ 8am - 12pm & 6pm - 11pm, Monday - Friday SUMMER OFF-PEAK 0.07458 $ 0.08458 $ 0.08958 $ All other hours WINTER MID-PEAK 0.09733 $ 0.10733 $ 0.11233 $ 8am - 9pm, Monday - Friday WINTER OFF-PEAK 0.06143 $ 0.07143 $ 0.07643 $ All other hours
YEAR ROUND VOLTAGE DISCOUNT -
ENERGY 2-50kV ($/kWh) (0.00208)$ (0.00208) $ (0.00208) $ All electric usage
YEAR ROUND VOLTAGE DISCOUNT -
ENERGY 51-219kV ($/kWh) (0.00470)$ (0.00470) $ (0.00470) $ All electric usage
YEAR ROUND VOLTAGE DISCOUNT -
ENERGY 220kV ($/kWh) (0.00475)$ (0.00475) $ (0.00475) $ All electric usage 733
Effective: Mar 24, 2025
OCPA Rate Schedule Period Basic Choice Smart Choice
100% Renewable
Choice Time Period Definitions
COMMERCIAL CUSTOMERS
TOU-GS-3-D Summer - June through September; Winter - October through May GENERATION CHARGE ($/KWH) SUMMER ON-PEAK 0.10181 $ 0.11181 $ 0.11681 $ 4pm - 9pm, Monday - Friday SUMMER MID-PEAK 0.09366 $ 0.10366 $ 0.10866 $ 4pm - 9pm, Saturday, Sunday, & holidays* SUMMER OFF-PEAK 0.06629 $ 0.07629 $ 0.08129 $ 9pm - 4pm, every day WINTER MID-PEAK 0.07507 $ 0.08507 $ 0.09007 $ 4pm - 9pm, every day WINTER OFF-PEAK 0.07546 $ 0.08546 $ 0.09046 $ 9pm - 8am, every day WINTER SUPER OFF-PEAK 0.04406 $ 0.05406 $ 0.05906 $ 8am - 4pm, every day
YEAR ROUND VOLTAGE DISCOUNT -
ENERGY 2-50kV ($/kWh) (0.00082)$ (0.00082) $ (0.00082) $ All electric usage
YEAR ROUND VOLTAGE DISCOUNT -
ENERGY 51-219kV ($/kWh) (0.00180)$ (0.00180) $ (0.00180) $ All electric usage
YEAR ROUND VOLTAGE DISCOUNT -
ENERGY 220kV ($/kWh) (0.00183)$ (0.00183) $ (0.00183) $ All electric usage DEMAND CHARGE ($/KW) SUMMER ON-PEAK 15.88 $ 15.88 $ 15.88 $ 4pm - 9pm, Monday - Friday WINTER MID-PEAK 5.75 $ 5.75 $ 5.75 $ 4pm - 9pm, Monday - Friday
SUMMER ON-PEAK VOLTAGE DISCOUNT
-
DEMAND 2-50kV ($/kW) (0.37)$ (0.37) $ (0.37) $ 4pm - 9pm, Monday - Friday
SUMMER ON-PEAK VOLTAGE DISCOUNT -
DEMAND 51-219kV ($/kW) (0.85)$ (0.85) $ (0.85) $ 4pm - 9pm, Monday - Friday
SUMMER ON-PEAK VOLTAGE DISCOUNT -
DEMAND 220kV ($/kW) (0.86)$ (0.86) $ (0.86) $ 4pm - 9pm, Monday - Friday
WINTER MID-PEAK (WEEKDAYS)
VOLTAGE DISCOUNT - DEMAND 2-50kV
($/kW)
(0.15)$ (0.15) $ (0.15) $ 4pm - 9pm, Monday - Friday
WINTER MID-PEAK (WEEKDAYS)
VOLTAGE DISCOUNT - DEMAND 51-
219kV ($/kW)
(0.31)$ (0.31) $ (0.31) $ 4pm - 9pm, Monday - Friday
WINTER MID-PEAK (WEEKDAYS)
VOLTAGE DISCOUNT - DEMAND 220kV
($/kW)
(0.31)$ (0.31) $ (0.31) $ 4pm - 9pm, Monday - Friday TOU-GS-3-E Summer - June through September; Winter - October through May GENERATION CHARGE ($/KWH) SUMMER ON-PEAK 0.28336 $ 0.29336 $ 0.29836 $ 4pm - 9pm, Monday - Friday SUMMER MID-PEAK 0.09366 $ 0.10366 $ 0.10866 $ 4pm - 9pm, Saturday, Sunday, & holidays* SUMMER OFF-PEAK 0.06629 $ 0.07629 $ 0.08129 $ 9pm - 4pm, every day WINTER MID-PEAK 0.11550 $ 0.12550 $ 0.13050 $ 4pm - 9pm, every day WINTER OFF-PEAK 0.07546 $ 0.08546 $ 0.09046 $ 9pm - 8am, every day WINTER SUPER OFF-PEAK 0.04406 $ 0.05406 $ 0.05906 $ 8am - 4pm, every day
YEAR ROUND VOLTAGE DISCOUNT -
ENERGY 2-50kV ($/kWh) (0.00151)$ (0.00151) $ (0.00151) $ All electric usage
YEAR ROUND VOLTAGE DISCOUNT -
ENERGY 51-219kV ($/kWh) (0.00337)$ (0.00337) $ (0.00337) $ All electric usage
YEAR ROUND VOLTAGE DISCOUNT -
ENERGY 220kV ($/kWh) (0.00342)$ (0.00342) $ (0.00342) $ All electric usage DEMAND CHARGE ($/KW) SUMMER ON-PEAK 4.40 $ 4.40 $ 4.40 $ 4pm - 9pm, Monday - Friday WINTER MID-PEAK 2.34 $ 2.34 $ 2.34 $ 4pm - 9pm, Monday - Friday
SUMMER ON-PEAK VOLTAGE DISCOUNT
-
DEMAND 2-50kV ($/kW) (0.15)$ (0.15) $ (0.15) $ 4pm - 9pm, Monday - Friday
SUMMER ON-PEAK VOLTAGE DISCOUNT -
DEMAND 51-219kV ($/kW) (0.34)$ (0.34) $ (0.34) $ 4pm - 9pm, Monday - Friday
SUMMER ON-PEAK VOLTAGE DISCOUNT -
DEMAND 220kV ($/kW) (0.35)$ (0.35) $ (0.35) $ 4pm - 9pm, Monday - Friday
WINTER MID-PEAK (WEEKDAYS)
VOLTAGE DISCOUNT - DEMAND 2-50kV
($/kW)
(0.05)$ (0.05) $ (0.05) $ 4pm - 9pm, Monday - Friday
WINTER MID-PEAK (WEEKDAYS)
VOLTAGE DISCOUNT - DEMAND 51-
219kV ($/kW)
(0.12)$ (0.12) $ (0.12) $ 4pm - 9pm, Monday - Friday
WINTER MID-PEAK (WEEKDAYS)
VOLTAGE DISCOUNT - DEMAND 220kV
($/kW)
(0.12)$ (0.12) $ (0.12) $ 4pm - 9pm, Monday - Friday TOU-GS-3-B Summer - June through September; Winter - October through May GENERATION CHARGE ($/KWH) SUMMER ON-PEAK 0.07814 $ 0.08814 $ 0.09314 $ 12pm - 6pm, Monday - Friday 734
Effective: Mar 24, 2025
OCPA Rate Schedule Period Basic Choice Smart Choice
100% Renewable
Choice Time Period Definitions
COMMERCIAL CUSTOMERS
SUMMER MID-PEAK 0.07359 $ 0.08359 $ 0.08859 $ 8am - 12pm & 6pm - 11pm, Monday - Friday SUMMER OFF-PEAK 0.07126 $ 0.08126 $ 0.08626 $ All other hours WINTER MID-PEAK 0.09667 $ 0.10667 $ 0.11167 $ 8am - 9pm, Monday - Friday WINTER OFF-PEAK 0.06022 $ 0.07022 $ 0.07522 $ All other hours DEMAND CHARGE ($/KW) SUMMER ON-PEAK 10.64 $ 10.64 $ 10.64 $ 12pm - 6pm, Monday - Friday SUMMER MID-PEAK 3.56 $ 3.56 $ 3.56 $ 8am - 12pm & 6pm - 11pm, Monday - Friday TOU-GS-3-R Summer - June through September; Winter - October through May GENERATION CHARGE ($/KWH) SUMMER ON-PEAK 0.20911 $ 0.21911 $ 0.22411 $ 12pm - 6pm, Monday - Friday SUMMER MID-PEAK 0.10786 $ 0.11786 $ 0.12286 $ 8am - 12pm & 6pm - 11pm, Monday - Friday SUMMER OFF-PEAK 0.07126 $ 0.08126 $ 0.08626 $ All other hours WINTER MID-PEAK 0.09667 $ 0.10667 $ 0.11167 $ 8am - 9pm, Monday - Friday WINTER OFF-PEAK 0.06022 $ 0.07022 $ 0.07522 $ All other hours
YEAR ROUND VOLTAGE DISCOUNT -
ENERGY 2-50kV ($/kWh) (0.00176)$ (0.00176) $ (0.00176) $ All electric usage
YEAR ROUND VOLTAGE DISCOUNT -
ENERGY 51-219kV ($/kWh) (0.00397)$ (0.00397) $ (0.00397) $ All electric usage
YEAR ROUND VOLTAGE DISCOUNT -
ENERGY 220kV ($/kWh) (0.00402)$ (0.00402) $ (0.00402) $ All electric usage 735
Effective: Mar 24, 2025
OCPA Rate Schedule Period Basic Choice Smart Choice
100% Renewable
Choice Time Period Definitions
COMMERCIAL CUSTOMERS
TOU-8-SEC-D Summer - June through September; Winter - October through May GENERATION CHARGE ($/KWH) SUMMER ON-PEAK 0.10145 $ 0.11145 $ 0.11645 $ 4pm - 9pm, Monday - Friday SUMMER MID-PEAK 0.09331 $ 0.10331 $ 0.10831 $ 4pm - 9pm, Saturday, Sunday, & holidays* SUMMER OFF-PEAK 0.06615 $ 0.07615 $ 0.08115 $ 9pm - 4pm, every day WINTER MID-PEAK 0.07495 $ 0.08495 $ 0.08995 $ 4pm - 9pm, every day WINTER OFF-PEAK 0.07536 $ 0.08536 $ 0.09036 $ 9pm - 8am, every day WINTER SUPER OFF-PEAK 0.04388 $ 0.05388 $ 0.05888 $ 8am - 4pm, every day DEMAND CHARGE ($/KW) SUMMER ON-PEAK 16.74 $ 16.74 $ 16.74 $ 4pm - 9pm, Monday - Friday WINTER MID-PEAK 5.13 $ 5.13 $ 5.13 $ 4pm - 9pm, Monday - Friday TOU-8-PRI-D Summer - June through September; Winter - October through May GENERATION CHARGE ($/KWH) SUMMER ON-PEAK 0.09617 $ 0.10617 $ 0.11117 $ 4pm - 9pm, Monday - Friday SUMMER MID-PEAK 0.08865 $ 0.09865 $ 0.10365 $ 4pm - 9pm, Saturday, Sunday, & holidays* SUMMER OFF-PEAK 0.06283 $ 0.07283 $ 0.07783 $ 9pm - 4pm, every day WINTER MID-PEAK 0.07127 $ 0.08127 $ 0.08627 $ 4pm - 9pm, every day WINTER OFF-PEAK 0.07178 $ 0.08178 $ 0.08678 $ 9pm - 8am, every day WINTER SUPER OFF-PEAK 0.04190 $ 0.05190 $ 0.05690 $ 8am - 4pm, every day DEMAND CHARGE ($/KW) SUMMER ON-PEAK 15.90 $ 15.90 $ 15.90 $ 4pm - 9pm, Monday - Friday WINTER MID-PEAK 5.95 $ 5.95 $ 5.95 $ 4pm - 9pm, Monday - Friday TOU-8-SUB-D Summer - June through September; Winter - October through May GENERATION CHARGE ($/KWH) SUMMER ON-PEAK 0.09028 $ 0.10028 $ 0.10528 $ 4pm - 9pm, Monday - Friday SUMMER MID-PEAK 0.08344 $ 0.09344 $ 0.09844 $ 4pm - 9pm, Saturday, Sunday, & holidays* SUMMER OFF-PEAK 0.05886 $ 0.06886 $ 0.07386 $ 9pm - 4pm, every day WINTER MID-PEAK 0.06680 $ 0.07680 $ 0.08180 $ 4pm - 9pm, every day WINTER OFF-PEAK 0.06750 $ 0.07750 $ 0.08250 $ 9pm - 8am, every day WINTER SUPER OFF-PEAK 0.03940 $ 0.04940 $ 0.05440 $ 8am - 4pm, every day
YEAR ROUND VOLTAGE DISCOUNT -
ENERGY 220kV ($/kWh) (0.00053)$ (0.00053) $ (0.00053) $ All electric usage DEMAND CHARGE ($/KW) SUMMER ON-PEAK 17.56 $ 17.56 $ 17.56 $ 4pm - 9pm, Monday - Friday WINTER MID-PEAK 5.67 $ 5.67 $ 5.67 $ 4pm - 9pm, Monday - Friday
SUMMER ON-PEAK VOLTAGE DISCOUNT -
DEMAND 220kV ($/kW) (0.17)$ (0.17) $ (0.17) $ 4pm - 9pm, Monday - Friday
WINTER MID-PEAK (WEEKDAYS)
VOLTAGE DISCOUNT - DEMAND 220kV
($/kW)
(0.05)$ (0.05) $ (0.05) $ 4pm - 9pm, Monday - Friday TOU-8-SEC-E Summer - June through September; Winter - October through May GENERATION CHARGE ($/KWH) SUMMER ON-PEAK 0.27412 $ 0.28412 $ 0.28912 $ 4pm - 9pm, Monday - Friday SUMMER MID-PEAK 0.09331 $ 0.10331 $ 0.10831 $ 4pm - 9pm, Saturday, Sunday, & holidays* SUMMER OFF-PEAK 0.06615 $ 0.07615 $ 0.08115 $ 9pm - 4pm, every day WINTER MID-PEAK 0.10849 $ 0.11849 $ 0.12349 $ 4pm - 9pm, every day WINTER OFF-PEAK 0.07536 $ 0.08536 $ 0.09036 $ 9pm - 8am, every day WINTER SUPER OFF-PEAK 0.04388 $ 0.05388 $ 0.05888 $ 8am - 4pm, every day DEMAND CHARGE ($/KW) SUMMER ON-PEAK 4.64 $ 4.64 $ 4.64 $ 4pm - 9pm, Monday - Friday WINTER MID-PEAK 2.10 $ 2.10 $ 2.10 $ 4pm - 9pm, Monday - Friday TOU-8-PRI-E Summer - June through September; Winter - October through May GENERATION CHARGE ($/KWH) SUMMER ON-PEAK 0.25669 $ 0.26669 $ 0.27169 $ 4pm - 9pm, Monday - Friday SUMMER MID-PEAK 0.08865 $ 0.09865 $ 0.10365 $ 4pm - 9pm, Saturday, Sunday, & holidays* SUMMER OFF-PEAK 0.06283 $ 0.07283 $ 0.07783 $ 9pm - 4pm, every day WINTER MID-PEAK 0.12285 $ 0.13285 $ 0.13785 $ 4pm - 9pm, every day WINTER OFF-PEAK 0.07178 $ 0.08178 $ 0.08678 $ 9pm - 8am, every day WINTER SUPER OFF-PEAK 0.04190 $ 0.05190 $ 0.05690 $ 8am - 4pm, every day DEMAND CHARGE ($/KW) SUMMER ON-PEAK 3.90 $ 3.90 $ 3.90 $ 4pm - 9pm, Monday - Friday WINTER MID-PEAK 0.68 $ 0.68 $ 0.68 $ 4pm - 9pm, Monday - Friday TOU-8-SUB-E Summer - June through September; Winter - October through May GENERATION CHARGE ($/KWH) SUMMER ON-PEAK 0.28096 $ 0.29096 $ 0.29596 $ 4pm - 9pm, Monday - Friday SUMMER MID-PEAK 0.08344 $ 0.09344 $ 0.09844 $ 4pm - 9pm, Saturday, Sunday, & holidays* SUMMER OFF-PEAK 0.05886 $ 0.06886 $ 0.07386 $ 9pm - 4pm, every day WINTER MID-PEAK 0.10838 $ 0.11838 $ 0.12338 $ 4pm - 9pm, every day WINTER OFF-PEAK 0.06750 $ 0.07750 $ 0.08250 $ 9pm - 8am, every day WINTER SUPER OFF-PEAK 0.03940 $ 0.04940 $ 0.05440 $ 8am - 4pm, every day
YEAR ROUND VOLTAGE DISCOUNT -
ENERGY 220kV ($/kWh) (0.00066)$ (0.00066) $ (0.00066) $ All electric usage DEMAND CHARGE ($/KW) SUMMER ON-PEAK 1.66 $ 1.66 $ 1.66 $ 4pm - 9pm, Monday - Friday WINTER MID-PEAK 0.81 $ 0.81 $ 0.81 $ 4pm - 9pm, Monday - Friday 736
Effective: Mar 24, 2025
OCPA Rate Schedule Period Basic Choice Smart Choice
100% Renewable
Choice Time Period Definitions
COMMERCIAL CUSTOMERS
SUMMER ON-PEAK VOLTAGE DISCOUNT -
DEMAND 220kV ($/kW) (0.02)$ (0.02) $ (0.02) $ 4pm - 9pm, Monday - Friday
WINTER MID-PEAK (WEEKDAYS)
VOLTAGE DISCOUNT - DEMAND 220kV
($/kW)
(0.01)$ (0.01) $ (0.01) $ 4pm - 9pm, Monday - Friday 737
Effective: Mar 24, 2025
OCPA Rate Schedule Period Basic Choice Smart Choice
100% Renewable
Choice Time Period Definitions
COMMERCIAL CUSTOMERS
TOU-8-SEC-B Summer - June through September; Winter - October through May GENERATION CHARGE ($/KWH) SUMMER ON-PEAK 0.07793 $ 0.08793 $ 0.09293 $ 12pm - 6pm, Monday - Friday SUMMER MID-PEAK 0.07315 $ 0.08315 $ 0.08815 $ 8am - 12pm & 6pm - 11pm, Monday - Friday SUMMER OFF-PEAK 0.07105 $ 0.08105 $ 0.08605 $ All other hours WINTER MID-PEAK 0.09314 $ 0.10314 $ 0.10814 $ 8am - 9pm, Monday - Friday WINTER OFF-PEAK 0.06093 $ 0.07093 $ 0.07593 $ All other hours DEMAND CHARGE ($/KW) SUMMER ON-PEAK 11.52 $ 11.52 $ 11.52 $ 12pm - 6pm, Monday - Friday SUMMER MID-PEAK 3.79 $ 3.79 $ 3.79 $ 8am - 12pm & 6pm - 11pm, Monday - Friday TOU-8-PRI-B Summer - June through September; Winter - October through May GENERATION CHARGE ($/KWH) SUMMER ON-PEAK 0.07416 $ 0.08416 $ 0.08916 $ 12pm - 6pm, Monday - Friday SUMMER MID-PEAK 0.06935 $ 0.07935 $ 0.08435 $ 8am - 12pm & 6pm - 11pm, Monday - Friday SUMMER OFF-PEAK 0.06763 $ 0.07763 $ 0.08263 $ All other hours WINTER MID-PEAK 0.09508 $ 0.10508 $ 0.11008 $ 8am - 9pm, Monday - Friday WINTER OFF-PEAK 0.05919 $ 0.06919 $ 0.07419 $ All other hours DEMAND CHARGE ($/KW) SUMMER ON-PEAK 11.19 $ 11.19 $ 11.19 $ 12pm - 6pm, Monday - Friday SUMMER MID-PEAK 3.59 $ 3.59 $ 3.59 $ 8am - 12pm & 6pm - 11pm, Monday - Friday TOU-8-SUB-B Summer - June through September; Winter - October through May GENERATION CHARGE ($/KWH) SUMMER ON-PEAK 0.06951 $ 0.07951 $ 0.08451 $ 12pm - 6pm, Monday - Friday SUMMER MID-PEAK 0.06482 $ 0.07482 $ 0.07982 $ 8am - 12pm & 6pm - 11pm, Monday - Friday SUMMER OFF-PEAK 0.06341 $ 0.07341 $ 0.07841 $ All other hours WINTER MID-PEAK 0.08796 $ 0.09796 $ 0.10296 $ 8am - 9pm, Monday - Friday WINTER OFF-PEAK 0.05609 $ 0.06609 $ 0.07109 $ All other hours
YEAR ROUND VOLTAGE DISCOUNT -
ENERGY 220kV ($/kWh) (0.00053)$ (0.00053) $ (0.00053) $ All electric usage DEMAND CHARGE ($/KW) SUMMER ON-PEAK 12.79 $ 12.79 $ 12.79 $ 12pm - 6pm, Monday - Friday SUMMER MID-PEAK 4.14 $ 4.14 $ 4.14 $ 8am - 12pm & 6pm - 11pm, Monday - Friday
SUMMER ON-PEAK AND MID-PEAK
VOLTAGE DISCOUNT - DEMAND 220kV
($/kW)
(0.25)$ (0.25) $ (0.25) $ 8am - 11pm, Monday - Friday TOU-8-SEC-R
Summer - June through September; Winter - October through May GENERATION CHARGE ($/KWH) SUMMER ON-PEAK 0.21030 $ 0.22030 $ 0.22530 $ 12pm - 6pm, Monday - Friday SUMMER MID-PEAK 0.10537 $ 0.11537 $ 0.12037 $ 8am - 12pm & 6pm - 11pm, Monday - Friday SUMMER OFF-PEAK 0.07105 $ 0.08105 $ 0.08605 $ All other hours WINTER MID-PEAK 0.09314 $ 0.10314 $ 0.10814 $ 8am - 9pm, Monday - Friday WINTER OFF-PEAK 0.06093 $ 0.07093 $ 0.07593 $ All other hours TOU-8-PRI-R Summer - June through September; Winter - October through May GENERATION CHARGE ($/KWH) SUMMER ON-PEAK 0.20075 $ 0.21075 $ 0.21575 $ 12pm - 6pm, Monday - Friday SUMMER MID-PEAK 0.09802 $ 0.10802 $ 0.11302 $ 8am - 12pm & 6pm - 11pm, Monday - Friday SUMMER OFF-PEAK 0.06763 $ 0.07763 $ 0.08263 $ All other hours WINTER MID-PEAK 0.09508 $ 0.10508 $ 0.11008 $ 8am - 9pm, Monday - Friday WINTER OFF-PEAK 0.05919 $ 0.06919 $ 0.07419 $ All other hours TOU-8-SUB-R Summer - June through September; Winter - October through May GENERATION CHARGE ($/KWH) SUMMER ON-PEAK 0.19883 $ 0.20883 $ 0.21383 $ 12pm - 6pm, Monday - Friday SUMMER MID-PEAK 0.09324 $ 0.10324 $ 0.10824 $ 8am - 12pm & 6pm - 11pm, Monday - Friday SUMMER OFF-PEAK 0.06341 $ 0.07341 $ 0.07841 $ All other hours WINTER MID-PEAK 0.08796 $ 0.09796 $ 0.10296 $ 8am - 9pm, Monday - Friday WINTER OFF-PEAK 0.05609 $ 0.06609 $ 0.07109 $ All other hours
YEAR ROUND VOLTAGE DISCOUNT -
ENERGY 220kV ($/kWh) (0.00083)$ (0.00083) $ (0.00083) $ All electric usage TOU-8-SEC-RBU Summer - June through September; Winter - October through May GENERATION CHARGE ($/KWH) SUMMER ON-PEAK 0.10145 $ 0.11145 $ 0.11645 $ 4pm - 9pm, Monday - Friday SUMMER MID-PEAK 0.09331 $ 0.10331 $ 0.10831 $ 4pm - 9pm, Saturday, Sunday, & holidays* SUMMER OFF-PEAK 0.06615 $ 0.07615 $ 0.08115 $ 9pm - 4pm, every day WINTER MID-PEAK 0.07495 $ 0.08495 $ 0.08995 $ 4pm - 9pm, every day WINTER OFF-PEAK 0.07536 $ 0.08536 $ 0.09036 $ 9pm - 8am, every day WINTER SUPER OFF-PEAK 0.04388 $ 0.05388 $ 0.05888 $ 8am - 4pm, every day DEMAND CHARGE ($/KW) SUMMER ON-PEAK 16.74 $ 16.74 $ 16.74 $ 4pm - 9pm, Monday - Friday WINTER MID-PEAK 5.13
$ 5.13 $ 5.13 $ 4pm - 9pm, Monday - Friday 738
Effective: Mar 24, 2025
OCPA Rate Schedule Period Basic Choice Smart Choice
100% Renewable
Choice Time Period Definitions
COMMERCIAL CUSTOMERS
TOU-8-PRI-RBU Summer - June through September; Winter - October through May GENERATION CHARGE ($/KWH) SUMMER ON-PEAK 0.09617 $ 0.10617 $ 0.11117 $ 4pm - 9pm, Monday - Friday SUMMER MID-PEAK 0.08865 $ 0.09865 $ 0.10365 $ 4pm - 9pm, Saturday, Sunday, & holidays* SUMMER OFF-PEAK 0.06283 $ 0.07283 $ 0.07783 $ 9pm - 4pm, every day WINTER MID-PEAK 0.07127 $ 0.08127 $ 0.08627 $ 4pm - 9pm, every day WINTER OFF-PEAK 0.07178 $ 0.08178 $ 0.08678 $ 9pm - 8am, every day WINTER SUPER OFF-PEAK 0.04190 $ 0.05190 $ 0.05690 $ 8am - 4pm, every day DEMAND CHARGE ($/KW) SUMMER ON-PEAK 15.90 $ 15.90 $ 15.90 $ 4pm - 9pm, Monday - Friday WINTER MID-PEAK 5.95 $ 5.95 $ 5.95 $ 4pm - 9pm, Monday - Friday TOU-8-SUB-RBU Summer - June through September; Winter - October through May GENERATION CHARGE ($/KWH) SUMMER ON-PEAK 0.09028 $ 0.10028 $ 0.10528 $ 4pm - 9pm, Monday - Friday SUMMER MID-PEAK 0.08344 $ 0.09344 $ 0.09844 $ 4pm - 9pm, Saturday, Sunday, & holidays* SUMMER OFF-PEAK 0.05886 $ 0.06886 $ 0.07386 $ 9pm - 4pm, every day WINTER MID-PEAK 0.06680 $ 0.07680 $ 0.08180 $ 4pm - 9pm, every day WINTER OFF-PEAK 0.06750 $ 0.07750 $ 0.08250 $ 9pm - 8am, every day WINTER SUPER OFF-PEAK 0.03940 $ 0.04940 $ 0.05440 $ 8am - 4pm, every day
YEAR ROUND VOLTAGE DISCOUNT -
ENERGY 220kV ($/kWh) (0.00053)$ (0.00053) $ (0.00053) $ All electric usage DEMAND CHARGE ($/KW) SUMMER ON-PEAK 17.56 $ 17.56 $ 17.56 $ 4pm - 9pm, Monday - Friday WINTER MID-PEAK 5.67 $ 5.67 $ 5.67 $ 4pm - 9pm, Monday - Friday
SUMMER ON-PEAK VOLTAGE DISCOUNT
-
DEMAND 220kV ($/kW) (0.17)$ (0.17) $ (0.17) $ 4pm - 9pm, Monday - Friday
WINTER WEEKDAYS VOLTAGE
DISCOUNT - DEMAND 220kV ($/kW) (0.05)$ (0.05) $ (0.05) $ 4pm - 9pm, Monday - Friday 739
Effective: Mar 24, 2025
OCPA Rate Schedule Period Basic Choice Smart Choice
100% Renewable
Choice Time Period Definitions
TOU-EV-7 Summer - June through September; Winter - October through May GENERATION CHARGE ($/KWH) SUMMER ON-PEAK 0.29881 $ 0.30881 $ 0.31381 $ 4pm - 9pm, Monday - Friday SUMMER MID-PEAK 0.11200 $ 0.12200 $ 0.12700 $ 4pm - 9pm, Saturday, Sunday, & holidays* SUMMER OFF-PEAK 0.09367 $ 0.10367 $ 0.10867 $ 9pm - 4pm, every day WINTER MID-PEAK 0.16522 $ 0.17522 $ 0.18022 $ 4pm - 9pm, every day WINTER OFF-PEAK 0.10857 $ 0.11857 $ 0.12357 $ 9pm - 8am, every day WINTER SUPER OFF-PEAK 0.05468 $ 0.06468 $ 0.06968 $ 8am - 4pm, every day
YEAR ROUND VOLTAGE DISCOUNT -
ENERGY 2-50kV ($/kWh) (0.00117)$ (0.00117) $ (0.00117) $ All electric usage
YEAR ROUND VOLTAGE DISCOUNT -
ENERGY 51-219kV ($/kWh) (0.00254)$ (0.00254) $ (0.00254) $ All electric usage
YEAR ROUND VOLTAGE DISCOUNT -
ENERGY 220kV ($/kWh) (0.00258)$ (0.00258) $ (0.00258) $ All electric usage TOU-EV-8 Summer - June through September; Winter - October through May GENERATION CHARGE ($/KWH) SUMMER ON-PEAK 0.32984 $ 0.33984 $ 0.34484 $ 4pm - 9pm, Monday - Friday SUMMER MID-PEAK 0.10054 $ 0.11054 $ 0.11554 $ 4pm - 9pm, Saturday, Sunday, & holidays* SUMMER OFF-PEAK 0.07996 $ 0.08996 $ 0.09496 $ 9pm - 4pm, every day WINTER MID-PEAK 0.14065 $ 0.15065 $ 0.15565 $ 4pm - 9pm, every day WINTER OFF-PEAK 0.09229 $ 0.10229 $ 0.10729 $ 9pm - 8am, every day WINTER SUPER OFF-PEAK 0.04518 $ 0.05518 $ 0.06018 $ 8am - 4pm, every day
YEAR ROUND VOLTAGE DISCOUNT -
ENERGY 2-50kV ($/kWh) (0.00208)$ (0.00208) $ (0.00208) $ All electric usage
YEAR ROUND VOLTAGE DISCOUNT -
ENERGY 51-219kV ($/kWh) (0.00470)$ (0.00470) $ (0.00470) $ All electric usage
YEAR ROUND VOLTAGE DISCOUNT -
ENERGY 220kV ($/kWh) (0.00475)$ (0.00475) $ (0.00475) $ All electric usage TOU-EV-9-SEC Summer - June through September; Winter - October through May GENERATION CHARGE ($/KWH) SUMMER ON-PEAK 0.25755 $ 0.26755 $ 0.27255 $ 4pm - 9pm, Monday - Friday SUMMER MID-PEAK 0.09331 $ 0.10331 $ 0.10831 $ 4pm - 9pm, Saturday, Sunday, & holidays* SUMMER OFF-PEAK 0.07450 $ 0.08450 $ 0.08950 $ 9pm - 4pm, every day WINTER MID-PEAK 0.13167 $ 0.14167 $ 0.14667 $ 4pm - 9pm, every day WINTER OFF-PEAK 0.08417 $ 0.09417 $ 0.09917 $ 9pm - 8am, every day WINTER SUPER OFF-PEAK 0.04388 $ 0.05388 $ 0.05888 $ 8am - 4pm, every day TOU-EV-9-PRI Summer - June through September; Winter - October through May GENERATION CHARGE ($/KWH) SUMMER ON-PEAK 0.23389 $ 0.24389 $ 0.24889 $ 4pm - 9pm, Monday - Friday SUMMER MID-PEAK 0.08865 $ 0.09865 $ 0.10365 $ 4pm - 9pm, Saturday, Sunday, & holidays* SUMMER OFF-PEAK 0.06995 $ 0.07995 $ 0.08495 $ 9pm - 4pm, every day WINTER MID-PEAK 0.12948 $ 0.13948 $ 0.14448 $ 4pm - 9pm, every day WINTER OFF-PEAK 0.07875 $ 0.08875 $ 0.09375 $ 9pm - 8am, every day WINTER SUPER OFF-PEAK 0.04190 $ 0.05190 $ 0.05690 $ 8am - 4pm, every day TOU-EV-9-SUB Summer - June through September; Winter - October through May GENERATION CHARGE ($/KWH) SUMMER ON-PEAK 0.22778 $ 0.23778 $ 0.24278 $ 4pm - 9pm, Monday - Friday SUMMER MID-PEAK 0.08344 $ 0.09344 $ 0.09844 $ 4pm - 9pm, Saturday, Sunday, & holidays* SUMMER OFF-PEAK 0.06531 $ 0.07531 $ 0.08031 $ 9pm - 4pm, every day WINTER MID-PEAK 0.11529 $ 0.12529 $ 0.13029 $ 4pm - 9pm, every day WINTER OFF-PEAK 0.07318 $ 0.08318 $ 0.08818 $ 9pm - 8am, every day WINTER SUPER OFF-PEAK 0.03940 $ 0.04940 $ 0.05440 $ 8am - 4pm, every day
YEAR ROUND VOLTAGE DISCOUNT -
ENERGY 220kV ($/kWh) (0.00083)$ (0.00083) $ (0.00083) $ All electric usage
BUSINESS ELECTRIC VEHICLE CUSTOMERS
740
Effective: Mar 24, 2025
OCPA Rate Schedule Period Basic Choice Smart Choice
100% Renewable
Choice Time Period Definitions
TOU-PA-2-D Summer - June through September; Winter - October through May GENERATION CHARGE ($/KWH) SUMMER ON-PEAK 0.10982 $ 0.11982 $ 0.12482 $ 4pm - 9pm, Monday - Friday SUMMER MID-PEAK 0.10096 $ 0.11096 $ 0.11596 $ 4pm - 9pm, Saturday, Sunday, & holidays* SUMMER OFF-PEAK 0.07000 $ 0.08000 $ 0.08500 $ 9pm - 4pm, every day WINTER MID-PEAK 0.08804 $ 0.09804 $ 0.10304 $ 4pm - 9pm, every day WINTER OFF-PEAK 0.07198 $ 0.08198 $ 0.08698 $ 9pm - 8am, every day WINTER SUPER OFF-PEAK 0.06286 $ 0.07286 $ 0.07786 $ 8am - 4pm, every day
YEAR ROUND VOLTAGE DISCOUNT -
ENERGY 2-50kV ($/kWh) (0.00084)$ (0.00084) $ (0.00084) $ All electric usage
YEAR ROUND VOLTAGE DISCOUNT -
ENERGY 51-219kV ($/kWh) (0.00186)$ (0.00186) $ (0.00186) $ All electric usage
YEAR ROUND VOLTAGE DISCOUNT -
ENERGY 220kV ($/kWh) (0.00186)$ (0.00186) $ (0.00186) $ All electric usage DEMAND CHARGE ($/KW) SUMMER ON-PEAK 10.17 $ 10.17 $ 10.17 $ 4pm - 9pm, Monday - Friday WINTER MID-PEAK 2.30 $ 2.30 $ 2.30 $ 4pm - 9pm, Monday - Friday
SUMMER ON-PEAK AND WINTER MID-
PEAK (WEEKDAYS) VOLTAGE DISCOUNT
-
DEMAND 2-50kV ($/kW)
(0.15)$ (0.15) $ (0.15) $ 4pm - 9pm, Monday - Friday
SUMMER ON-PEAK AND WINTER MID-
PEAK (WEEKDAYS) VOLTAGE DISCOUNT -
DEMAND 51-219kV ($/kW)
(0.31)$ (0.31) $ (0.31) $ 4pm - 9pm, Monday - Friday
SUMMER ON-PEAK AND WINTER MID-
PEAK (WEEKDAYS) VOLTAGE DISCOUNT -
DEMAND 220kV ($/kW)
(0.31)$ (0.31) $ (0.31) $ 4pm - 9pm, Monday - Friday WINTER WIND MACHINE CREDIT ($/kW) (9.76)$ (9.76) $ (9.76) $ All electric usage TOU-PA-2-D5 Summer - June through September; Winter - October through May GENERATION CHARGE ($/KWH) SUMMER ON-PEAK 0.20939 $ 0.21939 $ 0.22439 $ 5pm - 8pm, Monday - Friday SUMMER MID-PEAK 0.19804 $ 0.20804 $ 0.21304 $ 5pm - 8pm, Saturday, Sunday, & holidays* SUMMER OFF-PEAK 0.06620 $ 0.07620 $ 0.08120 $ 8pm - 5pm, every day WINTER MID-PEAK 0.08988 $ 0.09988 $ 0.10488 $ 5pm - 8pm, every day WINTER OFF-PEAK 0.07346 $ 0.08346 $ 0.08846 $ 8pm - 8am, every day WINTER SUPER OFF-PEAK 0.06410 $ 0.07410 $ 0.07910 $ 8am - 5pm, every day
YEAR ROUND VOLTAGE DISCOUNT -
ENERGY 2-50kV ($/kWh) (0.00087)$ (0.00087) $ (0.00087) $ All electric usage
YEAR ROUND VOLTAGE DISCOUNT -
ENERGY 51-219kV ($/kWh) (0.00191)$ (0.00191) $ (0.00191) $ All electric usage
YEAR ROUND VOLTAGE DISCOUNT -
ENERGY 220kV ($/kWh) (0.00192)$ (0.00192) $ (0.00192) $ All electric usage DEMAND CHARGE ($/KW) SUMMER ON-PEAK 9.74 $ 9.74 $ 9.74 $ 5pm - 8pm, Monday - Friday WINTER MID-PEAK 2.14 $ 2.14 $ 2.14 $ 4pm - 9pm, Monday - Friday
SUMMER ON-PEAK AND WINTER MID-
PEAK (WEEKDAYS) VOLTAGE DISCOUNT
-
DEMAND 2-50kV ($/kW)
(0.13)$ (0.13) $ (0.13) $ 5pm - 8pm, Monday - Friday
SUMMER ON-PEAK AND WINTER MID-
PEAK (WEEKDAYS) VOLTAGE DISCOUNT -
DEMAND 51-219kV ($/kW)
(0.29)$ (0.29) $ (0.29) $ 5pm - 8pm, Monday - Friday
SUMMER ON-PEAK AND WINTER MID-
PEAK (WEEKDAYS) VOLTAGE DISCOUNT -
DEMAND 220kV ($/kW)
(0.29)$ (0.29) $ (0.29) $ 5pm - 8pm, Monday - Friday WINTER WIND MACHINE CREDIT ($/kW) (9.76)$ (9.76) $ (9.76) $ All electric usage
AGRICULTURE CUSTOMERS
741
Effective: Mar 24, 2025
OCPA Rate Schedule Period Basic Choice Smart Choice
100% Renewable
Choice Time Period Definitions
AGRICULTURE CUSTOMERS
TOU-PA-2-E Summer - June through September; Winter - October through May GENERATION CHARGE ($/KWH) SUMMER ON-PEAK 0.34732 $ 0.35732 $ 0.36232 $ 4pm - 9pm, Monday - Friday SUMMER MID-PEAK 0.10096 $ 0.11096 $ 0.11596 $ 4pm - 9pm, Saturday, Sunday, & holidays* SUMMER OFF-PEAK 0.07000 $ 0.08000 $ 0.08500 $ 9pm - 4pm, every day WINTER MID-PEAK 0.10044 $ 0.11044 $ 0.11544 $ 4pm - 9pm, every day WINTER OFF-PEAK 0.08185 $ 0.09185 $ 0.09685 $ 9pm - 8am, every day WINTER SUPER OFF-PEAK 0.07127 $ 0.08127 $ 0.08627 $ 8am - 4pm, every day
YEAR ROUND VOLTAGE DISCOUNT -
ENERGY 2-50kV ($/kWh) (0.00139)$ (0.00139) $ (0.00139) $ All electric usage
YEAR ROUND VOLTAGE DISCOUNT -
ENERGY 51-219kV ($/kWh) (0.00302)$ (0.00302) $ (0.00302) $ All electric usage
YEAR ROUND VOLTAGE DISCOUNT -
ENERGY 220kV ($/kWh) (0.00303)$ (0.00303) $ (0.00303) $ All electric usage DEMAND CHARGE ($/KW) YEAR ROUND WIND MACHINE CREDIT
($/kW) (9.76)$ (9.76) $ (9.76) $ All electric usage TOU-PA-2-E5 Summer - June through September; Winter - October through May GENERATION CHARGE ($/KWH) SUMMER ON-PEAK 0.57163 $ 0.58163 $ 0.58663 $ 5pm - 8pm, Monday - Friday SUMMER MID-PEAK 0.19804 $ 0.20804 $ 0.21304 $ 5pm - 8pm, Saturday, Sunday, & holidays* SUMMER OFF-PEAK 0.06620 $ 0.07620 $ 0.08120 $ 8pm - 5pm, every day WINTER MID-PEAK 0.10085 $ 0.11085 $ 0.11585 $ 5pm - 8pm, every day WINTER OFF-PEAK 0.08218 $ 0.09218 $ 0.09718 $ 8pm - 8am, every day WINTER SUPER OFF-PEAK 0.07155 $ 0.08155 $ 0.08655 $ 8am - 5pm, every day
YEAR ROUND VOLTAGE DISCOUNT -
ENERGY 2-50kV ($/kWh) (0.00139)$ (0.00139) $ (0.00139) $ All electric usage
YEAR ROUND VOLTAGE DISCOUNT -
ENERGY 51-219kV ($/kWh) (0.00302)$ (0.00302) $ (0.00302) $ All electric usage
YEAR ROUND VOLTAGE DISCOUNT -
ENERGY 220kV ($/kWh) (0.00303)$ (0.00303) $ (0.00303) $ All electric usage DEMAND CHARGE ($/KW) YEAR ROUND WIND MACHINE CREDIT
($/kW) (9.76)$ (9.76) $ (9.76) $ All electric usage TOU-PA-2-A
Summer - June through September; Winter - October through May GENERATION CHARGE ($/KWH) SUMMER ON-PEAK 0.22244 $ 0.23244 $ 0.23744 $ 12pm - 6pm, Monday - Friday SUMMER MID-PEAK 0.10676 $ 0.11676 $ 0.12176 $ 8am - 12pm & 6pm - 11pm, Monday - Friday SUMMER OFF-PEAK 0.07538 $ 0.08538 $ 0.09038 $ All other hours WINTER MID-PEAK 0.09961 $ 0.10961 $ 0.11461 $ 8am - 9pm, Monday - Friday WINTER OFF-PEAK 0.06904 $ 0.07904 $ 0.08404 $ All other hours DEMAND CHARGE ($/KW) YEAR ROUND WIND MACHINE CREDIT
($/kW) (9.76)$ (9.76) $ (9.76) $ All electric usage TOU-PA-2-B Summer - June through September; Winter - October through May GENERATION CHARGE ($/KWH) SUMMER ON-PEAK 0.08271 $ 0.09271 $ 0.09771 $ 12pm - 6pm, Monday - Friday SUMMER MID-PEAK 0.07715 $ 0.08715 $ 0.09215 $ 8am - 12pm & 6pm - 11pm, Monday - Friday SUMMER OFF-PEAK 0.07538 $ 0.08538 $ 0.09038 $ All other hours WINTER MID-PEAK 0.09961 $ 0.10961 $ 0.11461 $ 8am - 9pm, Monday - Friday WINTER OFF-PEAK 0.06904 $ 0.07904 $ 0.08404 $ All other hours DEMAND CHARGE ($/KW) SUMMER ON-PEAK 7.21 $ 7.21 $ 7.21 $ 12pm - 6pm, Monday - Friday SUMMER MID-PEAK 2.21 $ 2.21 $ 2.21 $ 8am - 12pm & 6pm - 11pm, Monday - Friday WINTER WIND MACHINE CREDIT ($/kW) (9.76)$ (9.76) $ (9.76) $ All electric usage 742
Effective: Mar 24, 2025
OCPA Rate Schedule Period Basic Choice Smart Choice
100% Renewable
Choice Time Period Definitions
AGRICULTURE CUSTOMERS
TOU-PA-3-D Summer - June through September; Winter - October through May GENERATION CHARGE ($/KWH) SUMMER ON-PEAK 0.09653 $ 0.10653 $ 0.11153 $ 4pm - 9pm, Monday - Friday SUMMER MID-PEAK 0.08888 $ 0.09888 $ 0.10388 $ 4pm - 9pm, Saturday, Sunday, & holidays* SUMMER OFF-PEAK 0.06203 $ 0.07203 $ 0.07703 $ 9pm - 4pm, every day WINTER MID-PEAK 0.07678 $ 0.08678 $ 0.09178 $ 4pm - 9pm, every day WINTER OFF-PEAK 0.07721 $ 0.08721 $ 0.09221 $ 9pm - 8am, every day WINTER SUPER OFF-PEAK 0.04502 $ 0.05502 $ 0.06002 $ 8am - 4pm, every day
YEAR ROUND VOLTAGE DISCOUNT -
ENERGY 2-50kV ($/kWh) (0.00082)$ (0.00082) $ (0.00082) $ All electric usage
YEAR ROUND VOLTAGE DISCOUNT -
ENERGY 51-219kV ($/kWh) (0.00182)$ (0.00182) $ (0.00182) $ All electric usage
YEAR ROUND VOLTAGE DISCOUNT -
ENERGY 220kV ($/kWh) (0.00185)$ (0.00185) $ (0.00185) $ All electric usage DEMAND CHARGE ($/KW) SUMMER ON-PEAK 10.85 $ 10.85 $ 10.85 $ 4pm - 9pm, Monday - Friday WINTER MID-PEAK 2.34 $ 2.34 $ 2.34 $ 4pm - 9pm, Monday - Friday
SUMMER ON-PEAK AND WINTER MID-
PEAK (WEEKDAYS) VOLTAGE DISCOUNT
-
DEMAND 2-50kV ($/kW)
(0.16)$ (0.16) $ (0.16) $ 4pm - 9pm, Monday - Friday
SUMMER ON-PEAK AND WINTER MID-
PEAK (WEEKDAYS) VOLTAGE DISCOUNT -
DEMAND 51-219kV ($/kW)
(0.38)$ (0.38) $ (0.38) $ 4pm - 9pm, Monday - Friday
SUMMER ON-PEAK AND WINTER MID-
PEAK (WEEKDAYS) VOLTAGE DISCOUNT -
DEMAND 220kV ($/kW)
(0.38)$ (0.38) $ (0.38) $ 4pm - 9pm, Monday - Friday TOU-PA-3-D5 Summer - June through September; Winter - October through May GENERATION CHARGE ($/KWH) SUMMER ON-PEAK 0.17932 $ 0.18932 $ 0.19432 $ 5pm - 8pm, Monday - Friday SUMMER MID-PEAK 0.16968 $ 0.17968 $ 0.18468 $ 5pm - 8pm, Saturday, Sunday, & holidays* SUMMER OFF-PEAK 0.05891 $ 0.06891 $ 0.07391 $ 8pm - 5pm, every day WINTER MID-PEAK 0.07617 $ 0.08617 $ 0.09117 $ 5pm - 8pm, every day WINTER OFF-PEAK 0.07660 $ 0.08660 $ 0.09160 $ 8pm - 8am, every day WINTER SUPER OFF-PEAK 0.04463 $ 0.05463 $ 0.05963 $ 8am - 5pm, every day
YEAR ROUND VOLTAGE DISCOUNT -
ENERGY 2-50kV ($/kWh) (0.00083)$ (0.00083) $ (0.00083) $ All electric usage
YEAR ROUND VOLTAGE DISCOUNT -
ENERGY 51-219kV ($/kWh) (0.00182)$ (0.00182) $ (0.00182) $ All electric usage
YEAR ROUND VOLTAGE DISCOUNT -
ENERGY 220kV ($/kWh) (0.00185)$ (0.00185) $ (0.00185) $ All electric usage DEMAND CHARGE ($/KW) SUMMER ON-PEAK 10.40 $ 10.40 $ 10.40 $ 5pm - 8pm, Monday - Friday WINTER MID-PEAK 2.86 $ 2.86 $ 2.86 $ 4pm - 9pm, Monday - Friday
SUMMER ON-PEAK AND WINTER MID-
PEAK (WEEKDAYS) VOLTAGE DISCOUNT
-
DEMAND 2-50kV ($/kW)
(0.17)$ (0.17) $ (0.17) $ 5pm - 8pm, Monday - Friday
SUMMER ON-PEAK AND WINTER MID-
PEAK (WEEKDAYS) VOLTAGE DISCOUNT -
DEMAND 51-219kV ($/kW)
(0.39)$ (0.39) $ (0.39) $ 5pm - 8pm, Monday - Friday
SUMMER ON-PEAK AND WINTER MID-
PEAK (WEEKDAYS) VOLTAGE DISCOUNT -
DEMAND 220kV ($/kW)
(0.38)$ (0.38) $ (0.38) $ 5pm - 8pm, Monday - Friday TOU-PA-3-E Summer - June through September; Winter - October through May GENERATION CHARGE ($/KWH) SUMMER ON-PEAK 0.29845 $ 0.30845 $ 0.31345 $ 4pm - 9pm, Monday - Friday SUMMER MID-PEAK 0.08888 $ 0.09888 $ 0.10388 $ 4pm - 9pm, Saturday, Sunday, & holidays* SUMMER OFF-PEAK 0.06203 $ 0.07203 $ 0.07703 $ 9pm - 4pm, every day WINTER MID-PEAK 0.10563 $ 0.11563 $ 0.12063 $ 4pm - 9pm, every day WINTER OFF-PEAK 0.08605 $ 0.09605 $ 0.10105 $ 9pm - 8am, every day WINTER SUPER OFF-PEAK 0.03725 $ 0.04725 $ 0.05225 $ 8am - 4pm, every day
YEAR ROUND VOLTAGE DISCOUNT -
ENERGY 2-50kV ($/kWh) (0.00127)$ (0.00127) $ (0.00127) $ All electric usage
YEAR ROUND VOLTAGE DISCOUNT -
ENERGY 51-219kV ($/kWh) (0.00289)$ (0.00289) $ (0.00289) $ All electric usage
YEAR ROUND VOLTAGE DISCOUNT -
ENERGY 220kV ($/kWh) (0.00292)$ (0.00292) $ (0.00292) $ All electric usage 743 Effective: Mar 24, 2025
OCPA Rate Schedule Period Basic Choice Smart Choice
100% Renewable
Choice Time Period Definitions
AGRICULTURE CUSTOMERS
TOU-PA-3-E5 Summer - June through September; Winter - October through May GENERATION CHARGE ($/KWH) SUMMER ON-PEAK 0.48359 $ 0.49359 $ 0.49859 $ 5pm - 8pm, Monday - Friday SUMMER MID-PEAK 0.16968 $ 0.17968 $ 0.18468 $ 5pm - 8pm, Saturday, Sunday, & holidays* SUMMER OFF-PEAK 0.05891 $ 0.06891 $ 0.07391 $ 8pm - 5pm, every day WINTER MID-PEAK 0.11007 $ 0.12007 $ 0.12507 $ 5pm - 8pm, every day WINTER OFF-PEAK 0.08959 $ 0.09959 $ 0.10459 $ 8pm - 8am, every day WINTER SUPER OFF-PEAK 0.03854 $ 0.04854 $ 0.05354 $ 8am - 5pm, every day
YEAR ROUND VOLTAGE DISCOUNT -
ENERGY 2-50kV ($/kWh) (0.00128)$ (0.00128) $ (0.00128) $ All electric usage
YEAR ROUND VOLTAGE DISCOUNT -
ENERGY 51-219kV ($/kWh) (0.00290)$ (0.00290) $ (0.00290) $ All electric usage
YEAR ROUND VOLTAGE DISCOUNT -
ENERGY 220kV ($/kWh) (0.00292)$ (0.00292) $ (0.00292) $ All electric usage TOU-PA-3-A Summer - June through September; Winter - October through May GENERATION CHARGE ($/KWH) SUMMER ON-PEAK 0.19450 $ 0.20450 $ 0.20950 $ 12pm - 6pm, Monday - Friday SUMMER MID-PEAK 0.09285 $ 0.10285 $ 0.10785 $ 8am - 12pm & 6pm - 11pm, Monday - Friday SUMMER OFF-PEAK 0.06663 $ 0.07663 $ 0.08163 $ All other hours WINTER MID-PEAK 0.08698 $ 0.09698 $ 0.10198 $ 8am - 9pm, Monday - Friday WINTER OFF-PEAK 0.06344 $ 0.07344 $ 0.07844 $ All other hours TOU-PA-3-B Summer - June through September; Winter - October through May GENERATION CHARGE ($/KWH) SUMMER ON-PEAK 0.07300 $ 0.08300 $ 0.08800 $ 12pm - 6pm, Monday - Friday SUMMER MID-PEAK 0.06809 $ 0.07809 $ 0.08309 $ 8am - 12pm & 6pm - 11pm, Monday - Friday SUMMER OFF-PEAK 0.06663 $ 0.07663 $ 0.08163 $ All other hours WINTER MID-PEAK 0.08698 $ 0.09698 $ 0.10198 $ 8am - 9pm, Monday - Friday WINTER OFF-PEAK 0.06344 $ 0.07344 $ 0.07844 $ All other hours DEMAND CHARGE ($/KW) SUMMER ON-PEAK 7.64 $ 7.64 $ 7.64 $ 12pm - 6pm, Monday - Friday SUMMER MID-PEAK 2.24 $ 2.24 $ 2.24 $ 8am - 12pm & 6pm - 11pm, Monday - Friday 744
Effective: Mar 24, 2025
OCPA Rate Schedule Period Basic Choice Smart Choice
100% Renewable
Choice Time Period Definitions
Streetlighting
(LS-1, LS-2, DWL, and OL-1)
GENERATION CHARGE ($/KWH) YEAR-ROUND 0.06846 $ 0.07846 $ 0.08346 $ All electric usage LS-3
GENERATION CHARGE ($/KWH) YEAR-ROUND 0.06854 $ 0.07854 $ 0.08354 $ All electric usage AL-2-F
GENERATION CHARGE ($/KWH) YEAR-ROUND 0.06854 $ 0.07854 $ 0.08354 $ All electric usage AL-2-GF Summer - June through September; Winter - October through May GENERATION CHARGE ($/KWH) SUMMER ON-PEAK 0.14775$ 0.15775 $ 0.16275 $ 8am - 4pm, every day SUMMER OFF-PEAK 0.06854$ 0.07854 $ 0.08354 $ All other hours WINTER ON-PEAK 0.10115$ 0.11115 $ 0.11615 $ 8am - 4pm, every day WINTER OFF-PEAK 0.06854$ 0.07854 $ 0.08354 $ All other hours TC-1
GENERATION CHARGE ($/KWH) YEAR-ROUND 0.09268 $ 0.10268 $ 0.10768 $ All electric usage WTR
GENERATION CHARGE ($/KWH) YEAR-ROUND 0.10647 $ 0.11647 $ 0.12147 $ All electric usage *Applicable holidays for rate time periods are as follows: New Year's Day, Presidents’ Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day, and Christmas Day. When any holiday listed above falls on Sunday, the following Monday will be recognized as a holiday. No change will be made for holidays falling on Saturday.
STREETLIGHT CUSTOMERS
745
Effective: Mar 24, 2025
Wildfire Fund Non-Bypassable Charge
Competition Transition Charge
Rate Group WFC (All Vintages) CTC (All Vintages) GMS Factor (All Vintages) Domestic1 0.00595$ (0.00058) $ 0.009261 GS-12 0.00595$ (0.00041) $ 0.009261 TC-13 0.00595$ (0.00044) $ 0.009261 GS-24 0.00595$ (0.00043) $ 0.009261 TOU-GS-35 0.00595$ (0.00042) $ 0.009261 TOU-8-Sec6 0.00595$ (0.00041) $ 0.009261 TOU-8-Pri6 0.00595$ (0.00040) $ 0.009261 TOU-8-Sub6 0.00595$ (0.00038) $ 0.009261 Small AG7 0.00595$ (0.00042) $ 0.009261 Large AG8 0.00595$ (0.00042) $ 0.009261 St. Lighting9 0.00595$ (0.00053) $ 0.009261 2 Includes Schedules GS-1, TOU-GS-1, TOU-GS-1-RTP, AL-2 (On-Peak), LS-3 Option B (On- Peak), and TOU-EV-7. 3 Includes Schedules TC-1, Wi-Fi-1, and WTR.
4 Includes Schedules GS-2, TOU-EV-8, TOU-GS-2, and TOU-GS-2-RTP. 5 Includes Schedules TOU-GS-3 and TOU-GS-3-RTP.
6 Includes Schedules TOU-EV-9, TOU-8, TOU-8-RBU, and TOU-8-RTP. 7 Includes Schedules PA-1, PA-2, TOU-PA-2, and TOU-PA-2-RTP. 8 Includes Schedules TOU-PA-3 and TOU-PA-3-RTP.
9 Includes Schedules AL-2-(Off-Peak), DWL, LS-1, LS-2, LS-3, LS-3 Option B (Off-Peak), and OL-1.
The ongoing Competition Transition Charge (CTC) recovers the CPUC-approved market price limit for legacy electricity contracts (signed prior to 1998), as well as statutorily authorized costs that are related to restructuring of California’s electric industry prior to the energy crisis. These charges are assessed to all customers, including SCE-only customers, but are collected separately for CCA customers and go directly to SCE.
The Wildfire Fund Non-Bypassable Charge (WFC) supports the California Wildfire Fund. This charge is assessed to all customers, including SCE-only customers, but is collected separately for CCA customers. The funds go to the State of California for potential disbursement to IOUs, such as SCE, if a catastrophic event occurs. Customers on CARE and Medical Baseline Programs are currently exempt from these charges.
OCPA Rates in SCE Territory
Surcharge
The Generation Municipal Surcharge (GMS) Factor recovers franchise fees paid by SCE to operate within certain municipal jurisdictions within California. This charge is assessed to all customers, including SCE -only customers, but is collected separately for CCA customers. The charge equals the product of the GMS factor and the SCE rates or charges that have been removed from the bill of a customer receiving CCA service. An exemption applies to CA political subdivision and certain cogeneration or nonutility generation facilities. It is the responsibility of the customer to self-identify for exemption. 746
Effective: Mar 24, 2025
Power Charge Indifference Adjustment
Rate Group PCIA Vintage
Domestic1 (0.01613)$ 2022
GS-12 (0.00906)$ 2021
TC-13 (0.00962)$ 2021
GS-24 (0.00949)$ 2021
TOU-GS-35 (0.00922)$ 2021
TOU-8-Sec6 (0.00899)$ 2021
TOU-8-Pri6 (0.00879)$ 2021
TOU-8-Sub6 (0.00831)$ 2021
Small AG7 (0.00930)$ 2021
Large AG8 (0.00919)$ 2021
St. Lighting9 (0.01160)$ 2021 The Power Charge Indifference Adjustment (PCIA) is a fee collected by SCE and assessed to customers who receive their electric generation services from another provider. The PCIA is considered an "exit fee" assessed by SCE to cover costs for departing customers; resources acquired prior to a customer's change in service providers, and to ensure their current customers are “indifferent” to costs associated with the departed customers. SCE assigns customers a "PCIA Vintage" based on the date a customer’s respective community enrolled in alternative service; this date is reset upon reenrollment if a customer opts -out and later re-enrolls in OCPA service. The PCIA is charged on a per kWh basis based on net monthly usage, and is unaffected by time of use.
OCPA Rates in SCE Territory
747
OCPA Rate RIN - Basic Choice RIN - Smart Choice RIN - 100% Renewable TOU-GS-1-SEC-D USCA-XXOC-0038-0000 USCA-XXOC-0167-0000 USCA-XXOC-0166-0000 TOU-GS-1-PRI-D USCA-XXOC-0035-0000 USCA-XXOC-0161-0000 USCA-XXOC-0160-0000 TOU-GS-1-SUB-D USCA-XXOC-0041-0000 USCA-XXOC-0173-0000 USCA-XXOC-0172-0000 TOU-GS-1-SEC-E USCA-XXOC-0039-0000 USCA-XXOC-0169-0000 USCA-XXOC-0168-0000 TOU-GS-1-PRI-E USCA-XXOC-0036-0000 USCA-XXOC-0163-0000 USCA-XXOC-0162-0000 TOU-GS-1-SUB-E USCA-XXOC-0042-0000 USCA-XXOC-0175-0000 USCA-XXOC-0174-0000 TOU-GS-1-SEC-ES USCA-XXOC-0040-0000 USCA-XXOC-0171-0000 USCA-XXOC-0170-0000 TOU-GS-1-PRI-ES USCA-XXOC-0037-0000 USCA-XXOC-0165-0000 USCA-XXOC-0164-0000 TOU-GS-1-SUB-ES USCA-XXOC-0043-0000 USCA-XXOC-0177-0000 USCA-XXOC-0176-0000 TOU-GS-1-A USCA-XXOC-0033-0000 USCA-XXOC-0157-0000 USCA-XXOC-0156-0000 TOU-GS-1-B USCA-XXOC-0034-0000 USCA-XXOC-0159-0000 USCA-XXOC-0158-0000 TOU-GS-2-SEC-D USCA-XXOC-0048-0000 USCA-XXOC-0187-0000 USCA-XXOC-0186-0000 TOU-GS-2-PRI-D USCA-XXOC-0045-0000 USCA-XXOC-0181-0000 USCA-XXOC-0180-0000 TOU-GS-2-SUB-D USCA-XXOC-0051-0000 USCA-XXOC-0193-0000 USCA-XXOC-0192-0000 TOU-GS-2-SEC-E USCA-XXOC-0049-0000 USCA-XXOC-0189-0000 USCA-XXOC-0188-0000 TOU-GS-2-PRI-E USCA-XXOC-0046-0000 USCA-XXOC-0183-0000 USCA-XXOC-0182-0000 TOU-GS-2-SUB-E USCA-XXOC-0052-0000 USCA-XXOC-0195-0000 USCA-XXOC-0194-0000 TOU-GS-2-B USCA-XXOC-0044-0000 USCA-XXOC-0179-0000 USCA-XXOC-0178-0000 TOU-GS-2-SEC-R USCA-XXOC-0050-0000 USCA-XXOC-0191-0000 USCA-XXOC-0190-0000 TOU-GS-2-PRI-R USCA-XXOC-0047-0000 USCA-XXOC-0185-0000 USCA-XXOC-0184-0000 TOU-GS-2-SUB-R USCA-XXOC-0053-0000 USCA-XXOC-0197-0000 USCA-XXOC-0196-0000 TOU-GS-3-SEC-D USCA-XXOC-0058-0000 USCA-XXOC-0207-0000 USCA-XXOC-0206-0000 TOU-GS-3-PRI-D USCA-XXOC-0055-0000 USCA-XXOC-0201-0000 USCA-XXOC-0200-0000 TOU-GS-3-SUB-D USCA-XXOC-0061-0000 USCA-XXOC-0213-0000 USCA-XXOC-0212-0000 TOU-GS-3-SEC-E USCA-XXOC-0059-0000 USCA-XXOC-0209-0000 USCA-XXOC-0208-0000 TOU-GS-3-PRI-E USCA-XXOC-0056-0000 USCA-XXOC-0203-0000 USCA-XXOC-0202-0000 TOU-GS-3-SUB-E USCA-XXOC-0062-0000 USCA-XXOC-0215-0000 USCA-XXOC-0214-0000 TOU-GS-3-B USCA-XXOC-0054-0000 USCA-XXOC-0199-0000 USCA-XXOC-0198-0000 TOU-GS-3-SEC-R USCA-XXOC-0060-0000 USCA-XXOC-0211-0000 USCA-XXOC-0210-0000 TOU-GS-3-PRI-R USCA-XXOC-0057-0000 USCA-XXOC-0205-0000 USCA-XXOC-0204-0000 TOU-GS-3-SUB-R USCA-XXOC-0063-0000 USCA-XXOC-0217-0000 USCA-XXOC-0216-0000 TOU-8-SEC-D USCA-XXOC-0008-0000 USCA-XXOC-0107-0000 USCA-XXOC-0106-0000 TOU-8-PRI-D USCA-XXOC-0003-0000 USCA-XXOC-0097-0000 USCA-XXOC-0096-0000 TOU-8-SUB-D USCA-XXOC-0013-0000 USCA-XXOC-0117-0000 USCA-XXOC-0116-0000 TOU-8-SEC-E USCA-XXOC-0009-0000 USCA-XXOC-0109-0000 USCA-XXOC-0108-0000 TOU-8-PRI-E USCA-XXOC-0004-0000 USCA-XXOC-0099-0000 USCA-XXOC-0098-0000 TOU-8-SUB-E USCA-XXOC-0014-0000 USCA-XXOC-0119-0000 USCA-XXOC-0118-0000 TOU-8-SEC-B USCA-XXOC-0007-0000 USCA-XXOC-0105-0000 USCA-XXOC-0104-0000 Orange County Power Authority Rate Identification Number (RIN) Key The tables below show the corresponding Rate Identification Number (RIN) to Orange County Power Authority (OCPA) rate.
OCPA rates that are not time-dependent or Time-of-Use (TOU) do not have a corresponding RIN and are therefore excluded from this key. Your RIN can also be found below the "Details of your new charges" section on the generation portion of your utility bill.
Commercial Customers
748
TOU-8-PRI-B USCA-XXOC-0002-0000 USCA-XXOC-0095-0000 USCA-XXOC-0094-0000 TOU-8-SUB-B USCA-XXOC-0012-0000 USCA-XXOC-0115-0000 USCA-XXOC-0114-0000 TOU-8-SEC-R USCA-XXOC-0010-0000 USCA-XXOC-0111-0000 USCA-XXOC-0110-0000 TOU-8-PRI-R USCA-XXOC-0005-0000 USCA-XXOC-0101-0000 USCA-XXOC-0100-0000 TOU-8-SUB-R USCA-XXOC-0015-0000 USCA-XXOC-0121-0000 USCA-XXOC-0120-0000 TOU-8-SEC-RBU USCA-XXOC-0011-0000 USCA-XXOC-0113-0000 USCA-XXOC-0112-0000 TOU-8-PRI-RBU USCA-XXOC-0006-0000 USCA-XXOC-0103-0000 USCA-XXOC-0102-0000 TOU-8-SUB-RBU USCA-XXOC-0016-0000 USCA-XXOC-0123-0000 USCA-XXOC-0122-0000 TOU-EV-7-SEC USCA-XXOC-0025-0000 USCA-XXOC-0141-0000 USCA-XXOC-0140-0000 TOU-EV-7-PRI USCA-XXOC-0024-0000 USCA-XXOC-0139-0000 USCA-XXOC-0138-0000 TOU-EV-7-SUB USCA-XXOC-0026-0000 USCA-XXOC-0143-0000 USCA-XXOC-0142-0000 TOU-EV-8-SEC USCA-XXOC-0028-0000 USCA-XXOC-0147-0000 USCA-XXOC-0146-0000 TOU-EV-8-PRI USCA-XXOC-0027-0000 USCA-XXOC-0145-0000 USCA-XXOC-0144-0000 TOU-EV-8-SUB USCA-XXOC-0029-0000 USCA-XXOC-0149-0000 USCA-XXOC-0148-0000 TOU-EV-9-SEC USCA-XXOC-0031-0000 USCA-XXOC-0153-0000 USCA-XXOC-0152-0000 TOU-EV-9-PRI USCA-XXOC-0030-0000 USCA-XXOC-0151-0000 USCA-XXOC-0150-0000 TOU-EV-9-SUB USCA-XXOC-0032-0000 USCA-XXOC-0155-0000 USCA-XXOC-0154-0000 TOU-PA-2-SEC-D USCA-XXOC-0070-0000 USCA-XXOC-0231-0000 USCA-XXOC-0230-0000 TOU-PA-2-PRI-D USCA-XXOC-0066-0000 USCA-XXOC-0223-0000 USCA-XXOC-0222-0000 TOU-PA-2-SUB-D USCA-XXOC-0074-0000 USCA-XXOC-0239-0000 USCA-XXOC-0238-0000 TOU-PA-2-SEC-D5 USCA-XXOC-0071-0000 USCA-XXOC-0233-0000 USCA-XXOC-0232-0000 TOU-PA-2-PRI-D5 USCA-XXOC-0067-0000 USCA-XXOC-0225-0000 USCA-XXOC-0224-0000 TOU-PA-2-SUB-D5 USCA-XXOC-0075-0000 USCA-XXOC-0241-0000 USCA-XXOC-0240-0000 TOU-PA-2-SEC-E USCA-XXOC-0072-0000 USCA-XXOC-0235-0000 USCA-XXOC-0234-0000 TOU-PA-2-PRI-E USCA-XXOC-0068-0000 USCA-XXOC-0227-0000 USCA-XXOC-0226-0000 TOU-PA-2-SUB-E USCA-XXOC-0076-0000 USCA-XXOC-0243-0000 USCA-XXOC-0242-0000 TOU-PA-2-SEC-E5 USCA-XXOC-0073-0000 USCA-XXOC-0237-0000 USCA-XXOC-0236-0000 TOU-PA-2-PRI-E5 USCA-XXOC-0069-0000 USCA-XXOC-0229-0000 USCA-XXOC-0228-0000 TOU-PA-2-SUB-E5 USCA-XXOC-0077-0000 USCA-XXOC-0245-0000 USCA-XXOC-0244-0000 TOU-PA-2-A USCA-XXOC-0064-0000 USCA-XXOC-0219-0000 USCA-XXOC-0218-0000 TOU-PA-2-B USCA-XXOC-0065-0000 USCA-XXOC-0221-0000 USCA-XXOC-0220-0000 TOU-PA-3-SEC-D USCA-XXOC-0084-0000 USCA-XXOC-0259-0000 USCA-XXOC-0258-0000 TOU-PA-3-PRI-D USCA-XXOC-0080-0000 USCA-XXOC-0251-0000 USCA-XXOC-0250-0000 TOU-PA-3-SUB-D USCA-XXOC-0088-0000 USCA-XXOC-0267-0000 USCA-XXOC-0266-0000 TOU-PA-3-SEC-D5 USCA-XXOC-0085-0000 USCA-XXOC-0261-0000 USCA-XXOC-0260-0000 TOU-PA-3-PRI-D5 USCA-XXOC-0081-0000 USCA-XXOC-0253-0000 USCA-XXOC-0252-0000 TOU-PA-3-SUB-D5 USCA-XXOC-0089-0000 USCA-XXOC-0269-0000 USCA-XXOC-0268-0000 TOU-PA-3-SEC-E USCA-XXOC-0086-0000 USCA-XXOC-0263-0000 USCA-XXOC-0262-0000 TOU-PA-3-PRI-E USCA-XXOC-0082-0000 USCA-XXOC-0255-0000 USCA-XXOC-0254-0000 TOU-PA-3-SUB-E USCA-XXOC-0090-0000 USCA-XXOC-0271-0000 USCA-XXOC-0270-0000 TOU-PA-3-SEC-E5 USCA-XXOC-0087-0000 USCA-XXOC-0265-0000 USCA-XXOC-0264-0000 TOU-PA-3-PRI-E5 USCA-XXOC-0083-0000 USCA-XXOC-0257-0000 USCA-XXOC-0256-0000 TOU-PA-3-SUB-E5 USCA-XXOC-0091-0000 USCA-XXOC-0273-0000 USCA-XXOC-0272-0000 TOU-PA-3-A USCA-XXOC-0078-0000 USCA-XXOC-0247-0000 USCA-XXOC-0246-0000 TOU-PA-3-B USCA-XXOC-0079-0000 USCA-XXOC-0249-0000 USCA-XXOC-0248-0000 AL-2-GF USCA-XXOC-0001-0000 USCA-XXOC-0093-0000 USCA-XXOC-0092-0000 749
Effective: Mar 24, 2025
OCPA Rate Schedule Period Basic Choice Smart Choice
100% Renewable
Choice Time Period Definitions
DOMESTIC
GENERATION CHARGE ($/KWH) YEAR-ROUND 0.12323$ 0.13323$ 0.13823$ All electric usage TOU-D-4 Summer - June through September; Winter - October through May GENERATION CHARGE ($/KWH) SUMMER ON-PEAK 0.24871$ 0.25871$ 0.26371$ 4pm - 9pm, Monday - Friday SUMMER MID-PEAK 0.14074$ 0.15074$ 0.15574$ 4pm - 9pm, Saturday, Sunday, & holidays SUMMER OFF-PEAK 0.08352$ 0.09352$ 0.09852$ All other hours WINTER MID-PEAK 0.18158$ 0.19158$ 0.19658$ 4pm - 9pm, every day WINTER OFF-PEAK 0.10852$ 0.11852$ 0.12352$ 9pm - 8am, every day WINTER SUPER OFF-PEAK 0.09104$ 0.10104$ 0.10604$ 8am - 4pm, every day TOU-D-5 Summer - June through September; Winter - October through May GENERATION CHARGE ($/KWH) SUMMER ON-PEAK 0.38633$ 0.39633$ 0.40133$ 5pm - 8pm, Monday - Friday SUMMER MID-PEAK 0.20625$ 0.21625$ 0.22125$ 5pm - 8pm, Saturday, Sunday, & holidays SUMMER OFF-PEAK 0.07455$ 0.08455$ 0.08955$ All other hours WINTER MID-PEAK 0.26331$ 0.27331$ 0.27831$ 5pm - 8pm, every day WINTER OFF-PEAK 0.10694$ 0.11694$ 0.12194$ 8pm - 8am, every day WINTER SUPER OFF-PEAK 0.08148$ 0.09148$ 0.09648$ 8am - 5pm, every day TOU-D-A Summer - June through September; Winter - October through May GENERATION CHARGE ($/KWH) SUMMER ON-PEAK 0.26354$ 0.27354$ 0.27854$ 2pm - 8pm, Monday - Friday SUMMER OFF-PEAK 0.11952$ 0.12952$ 0.13452$ 8am - 2pm & 8pm - 10pm, Monday - Friday 8am - 10pm, Saturday, Sunday & holidays
SUMMER SUPER OFF-PEAK 0.08898$ 0.09898$ 0.10398$ 10pm - 8am, every day WINTER ON-PEAK 0.16313$ 0.17313$ 0.17813$ 2pm - 8pm, Monday - Friday WINTER OFF-PEAK 0.09488$ 0.10488$ 0.10988$ 8am - 2pm & 8pm - 10pm, Monday - Friday 8am - 10pm, Saturday, Sunday & holidays
WINTER SUPER OFF-PEAK 0.09066$ 0.10066$ 0.10566$ 10pm - 8am, every day TOU-D-B Summer - June through September; Winter - October through May GENERATION CHARGE ($/KWH) SUMMER ON-PEAK 0.38707$ 0.39707$ 0.40207$ 2pm - 8pm, Monday - Friday SUMMER OFF-PEAK 0.11948$ 0.12948$ 0.13448$ 8am - 2pm & 8pm - 10pm, Monday - Friday 8am - 10pm, Saturday, Sunday & holidays
SUMMER SUPER OFF-PEAK
0.05374$ 0.06374 $ 0.06874 $ 10pm - 8am, every day WINTER ON-PEAK 0.15787 $ 0.16787 $ 0.17287 $ 2pm - 8pm, Monday - Friday WINTER OFF-PEAK 0.09489 $ 0.10489 $ 0.10989 $ 8am - 2pm & 8pm - 10pm, Monday - Friday 8am - 10pm, Saturday, Sunday & holidays
WINTER SUPER OFF-PEAK 0.05460$ 0.06460 $ 0.06960 $ 10pm - 8am, every day TOU-D-PRIME Summer - June through September; Winter - October through May GENERATION CHARGE ($/KWH) SUMMER ON-PEAK 0.28834 $ 0.29834 $ 0.30334 $ 4pm - 9pm, Monday - Friday SUMMER MID-PEAK 0.11305 $ 0.12305 $ 0.12805 $ 4pm - 9pm, Saturday, Sunday, & holidays SUMMER OFF-PEAK 0.08087 $ 0.09087 $ 0.09587 $ All other hours WINTER MID-PEAK 0.25415 $ 0.26415 $ 0.26915 $ 4pm - 9pm, every day WINTER OFF-PEAK 0.07085 $ 0.08085 $ 0.08585 $ 9pm - 8am, every day WINTER SUPER OFF-PEAK 0.07085$ 0.08085 $ 0.08585 $ 8am - 4pm, every day TOU-D-T Summer - June through September; Winter - October through May GENERATION CHARGE ($/KWH) SUMMER ON-PEAK 0.15191 $ 0.16191 $ 0.16691 $ 12pm - 6pm, Monday - Friday except holidays*
SUMMER OFF-PEAK 0.13957 $ 0.14957 $ 0.15457 $ All other hours WINTER ON-PEAK 0.11696 $ 0.12696 $ 0.13196 $ 12pm - 6pm, Monday - Friday except holidays*
WINTER OFF-PEAK 0.10779 $ 0.11779 $ 0.12279 $ All other hours
RESIDENTIAL CUSTOMERS
*Holidays are New Year's Day, Presidents’ Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day, and Christmas.
Attachment 3
750
OCPA Rate RIN - Basic Choice RIN - Smart Choice RIN - 100% Renewable TOU-D-4 USCA-XXOC-0017-0000 USCA-XXOC-0125-0000 USCA-XXOC-0124-0000 TOU-D-5 USCA-XXOC-0018-0000 USCA-XXOC-0127-0000 USCA-XXOC-0126-0000 TOU-D-A USCA-XXOC-0019-0000 USCA-XXOC-0129-0000 USCA-XXOC-0128-0000 TOU-D-B USCA-XXOC-0020-0000 USCA-XXOC-0131-0000 USCA-XXOC-0130-0000 TOU-D-PRIME USCA-XXOC-0021-0000 USCA-XXOC-0133-0000 USCA-XXOC-0132-0000 TOU-D-T USCA-XXOC-0022-0000 USCA-XXOC-0135-0000 USCA-XXOC-0134-0000 Orange County Power Authority Rate Identification Number (RIN) Key The tables below show the corresponding Rate Identification Number (RIN) to Orange County Power Authority (OCPA) rate.
OCPA rates that are not time-dependent or Time-of-Use (TOU) do not have a corresponding RIN and are therefore excluded from this key. Your RIN can also be found below the "Details of your new charges" section on the generation portion of your utility bill.
Residential Customers
751
SEPTEMBER 9, 2024 0
FY25- 26 MARKETING & PUBLIC OUTREACH (July 2025 -2026)
Attachment 4
752
Table of Contents
Fiscal Year Operating Budget 2025-2026
02 CEO Message
04 Operating Budget Roadmap
05 Operating Budget Background and Highlights
07 FY2025/26 Recommended OCPA Operating Budget
09 Revenue and Cost of Energy Assumptions
16 Operating Expense Highlights
29 5-Year OCPA Financial Proforma FY2026/27 – FY2030/31 32 About OCPA
33 2025 OCPA Board
753
CEO Message
2 As we prepare for the FY25/26 fiscal year, the Orange County Power Authority (OCPA) reaffirms its unwavering commitment to delivering affordable, reliable, and sustainable energy to our customers. The proposed budget reflects a strategic, forward-thinking approach, adeptly balancing immediate fiscal challenges with a vision for long-term resilience and growth. Anchored by our core principles of transparency, customer empowerment, and community-driven innovation, OCPA is poised to navigate a dynamic regulatory and market landscape while delivering exceptional value to the communities we serve.
A critical challenge in 2026 is the volatility of the Power Charge Indifference Adjustment (PCIA), driven by fluctuating market dynamics and legacy utility contract vintages. In collaboration with the California Community Choice Association (CalCCA), OCPA is spearheading advocacy efforts at the California Public Utilities Commission (CPUC) to enact meaningful PCIA reforms. These reforms prioritize capping the PCIA, enhancing transparency in its methodology, and ensuring equitable cost allocation. By stabilizing PCIA expenses, we safeguard our ability to offer competitive rates relative to Southern California Edison (SCE), reinforcing affordability for our customers.
Affordability remains the cornerstone of OCPA’s mission. Our Basic Choice plan, delivering 47% renewable energy, is projected to maintain a 3% cost advantage over SCE’s equivalent generation rates, ensuring tangible savings for our customers. The FY25/26 budget is meticulously crafted to fully fund operating expenses, debt obligations, and a prudent reserve contribution, supported by a robust energy cost mitigation strategy that preserves our competitive edge.
OCPA’s financial position continues to strengthen, supported by consistent operating surpluses. For FY25/26, we aim to build reserves to 30–50% of annual operating expenses, enhancing liquidity and operational flexibility. Concurrently, we are advancing a strategic roadmap to secure an investment- grade credit rating by 2027, which will strengthen our capacity to negotiate favorable energy procurement terms and fortify our fiscal foundation.
To optimize long-term power procurement costs, OCPA is exploring innovative financing solutions, such as green prepayment bonds. A rigorous feasibility study will assess market conditions and OCPA’s financial preparedness, with findings to be presented in a transparent workshop for our Board of Directors. This session will feature detailed case studies and comprehensive cost-benefit analyses, ensuring decisions are informed, accountable, and aligned with our mission.
754
3 OCPA is steadfast in its commitment to reinvesting in the communities we serve. In FY25/26, we will expand transformative customer programs to advance equitable access to clean energy. These initiatives include solar incentives, enhanced electric vehicle (EV) charging infrastructure, and the Disadvantaged Communities Green Tariff (DAC-GT) program. The DAC-GT will deliver 100% renewable energy and a 20% bill discount to eligible residential customers in disadvantaged communities, furthering the objectives of our Community Power Plan and promoting energy equity.
OCPA is thrilled to announce the planned expansion of service to Fountain Valley in October 2026. This milestone will broaden our customer base and enhance economies of scale, driving operational efficiencies. To ensure a seamless transition, we are implementing meticulous financial planning and strategic forecasting to align revenue and expenditure projections, maintaining our commitment to fiscal stability.
With the steadfast support of our Board and community, OCPA is uniquely positioned to lead the transition to a cleaner, more affordable, and equitable energy future. Through prudent resource management, robust policy advocacy, and impactful community programs, we will continue to combat climate change while empowering our communities with sustainable, accessible energy solutions.
Joe Mosca
Chief Executive Officer
CEO Message (Continued)
755
01 April 15
Discuss Budget Framework with Ad-Hoc
Budget & Finance Committee
Incorporate changes
based on Board feedback
Present Recommended
Budget to OCPA Board
Present Budget Framework
to OCPA Board*
Brief Draft Budget to
OCPA Board
02 03
04 05
May 12
Mid-May
June 9
Early June
*The presentation was delivered to the committee through a video submission on May 18, 2025.
FY2025/26 Budget
Roadmap
756
The Orange County Power Authority (OCPA) is pleased to present a balanced budget for Fiscal Year 2025-26, marking the third year of full operations. This budget aligns with the Board-approved strategic goal of prioritizing fiscal sustainability and affordability.
OCPA’s budget is updated annually and reviewed mid-year to balance immediate operational needs with long-term financial stability and rate affordability. It outlines estimated revenues and expenses for the fiscal year, spanning July 1, 2025, to June 30, 2026, and is developed using a zero-based budgeting approach, requiring all expenses to be justified from the ground up to ensure efficient and purpose-driven resource allocation.
The proposed budget is organized into two primary categories: revenues and expenses. These categories are intentionally broad to provide flexibility, minimizing the need for frequent adjustments while ensuring adaptability to changing conditions.
OCPA FY2025/26
Operating Budget - Background
5 757
1. Financial Strength: Despite reduced rates, OCPA maintains robust financial health, projecting a net surplus of $0.45 million. The operating reserve is expected to reach $45 million, covering 16% of total operating expenses by June 30, 2026, and subsequently elevate it to $76 million (30% of total operating expenses) by December 31, 2026, thus meeting the Board’s minimum reserve target.
2. Affordable Rates: OCPA’s 2025 rate structure remains unchanged, offering competitive pricing. Basic Choice rates, with 47% renewable energy, provide a 3% discount compared to SCE’s equivalent generation rates. Smart Choice rates deliver 55% renewable and 40% carbon-free energy in 2025, increasing to 60% renewable and 40% carbon-free energy in 2026, and add 1¢/kWh to Basic Choice rates. 100% Renewable Choice rates add 1.5¢/kWh to Basic Choice rates. The 3% discount applied to Basic Choice rates is proportionally extended across all three rate plans.
3. Competitive Net Energy Metering Program: OCPA preserves NEM 2.0 benefits for all customers, providing full retail compensation, accelerated solar payback, and a net surplus compensation rate 10% higher than SCE’s, reinforcing local solar adoption.
4. Clean and Renewable Procurement Strategy: Secures long-term contracts for clean and renewable energy resources to meet a significant portion of its electric demand, ensuring sustainability and cost stability.
5. Innovative Financing Options: To optimize long-term power procurement costs, OCPA will explore green prepayment bonds, enhancing financial flexibility for clean energy investments.
6. Community Power Plan: Advances equitable clean energy access through solar-focused initiatives, including a low-interest loan program for solar incentives, expanded EV charging infrastructure, and the Disadvantaged Community Green Tariff program, which provides 100% renewable energy and bill discounts to income-qualified residents.
7. Talented Workforce: OCPA plans to reclassify two existing positions and maintain adequate staffing to support core operations and strategic priorities.6 OCPA FY2025/26 Operating Budget - Highlights
758
7 Recommended OCPA Operating
Budget FY2025/26
($ in thousands)
Period Ending Jun 30
Approved
Mid-Year
Budget
FY 2024/25
% of
Rev
Reforecast
FY2024/25 % of Rev
Proposed
Budget
FY2025/26 % of Rev Change $ Change %
REVENUE AND OTHER SOURCES
Revenue - Electricity Base 252,312 248,064 246,322
Revenue - Smart Choice Premium 5,931 5,257 7,430
Revenue - 100% Renewable Premium 13,411 16,008 3,252
Less: Uncollectible Accounts (4,754) (4,713) (3,855) (11,467) (4.3%) Revenue deferral 45,000 15,112 29,888 14,776 97.8%
Net Revenue - Electricity 311,900 98.6% 279,728 98.4% 283,037 99.0% 3,309 1.2% Investment and Miscellaneous Income 4,499 1.4% 4,510 1.6% 3,000 1.0% (1,510) (33.5%) Total Net Revenue and Other Sources 316,399 100.0% 284,238 100.0% 286,037 100.0% 1,799 0.6%
EXPENDITURES AND OTHER USES
CURRENT EXPENDITURES
Cost of Energy 285,539 90.2% 271,038 95.4% 269,368 94.2% (1,669) (0.6%) Data Manager 1,850 0.6% 1,831 0.6% 2,237 0.8% 406 22.2% Utilities Service Fees 572 0.2% 456 0.2% 480 0.2% 24 5.2% Staffing Costs 4,738 1.5% 4,560 1.6% 6,212 2.2% 1,652 36.2% Contract Services 1,610 0.5% 1,521 0.5% 1,562 0.5% 40 2.6% Legal Services 596 0.2% 506 0.2% 756 0.3% 250 49.3%
Marketing and Outreach 1,794 0.6% 1,726 0.6% 1,650 0.6% (76) (4.4%) Other G&A 1,429 0.5% 1,328 0.5% 1,787 0.6% 459 34.6%
Energy Programs 592 0.2% 586 0.2% 1,221 0.4% 635 108.4% 298,721 94.4% 283,552 99.8% 285,272 99.7% 1,720 0.6%
OTHER USES
Capital Outlay 377 0.1% 377 0.1% 0 0.0% (377) (100.0%) Total Other Uses 377 0.1% 377 0.1% 0 0.0% (377) (100.0%)
DEBT SERVICE
Interest costs - nonoperating 315 0.1% 309 0.1% 314 0.1% 5 1.6% Finance costs - Principal 0 0.0% 0 0.0% 0 0.0% 0 0.0%
Total Expenditures and Other Uses 299,413 94.6% 284,238 100.0% 285,587 99.8% 1,349 0.5% Net Income (Surplus/Deficit) 16,986 5.4% 0 0.0% 450 0.2% 450 105823.4% Key Statistics:
Total Load (MWh) - Retail 2,181,527 2,181,527 2,150,129 $/MWh - Net Electricity Sales 142.97$ 121.30$ 117.74$ 759
$ in thousands
Period Ending June 30
Approved
FY2024/25
Mid-Year
Budget
%
rev
%
of Total
Operating
Expenses
FY2024/25
Reforecast
%
rev
%
of Total
Operating
Expenses
Difference
($)
FY2025/26
Recommended
Budget
%
rev
%
of Total
Operating
Expenses
YOY
Difference
($)
Net Electricity Revenue $266,900 $264,616 $253,149
Revenue Deferral from FY2023/24 45,000 45,000
Revenue Deferral from FY2024/25 (29,888) 29,888
Net Electricity Revenue 311,900 98.6% 279,728 98.4% (32,172) 283,037 99.0% 3,309 Investment Income 4,499 1.4% 4,510 1.6% 11 3,000 1.0% (1,510) Less: Cost of Energy 285,539 90.2% 95.6% 271,038 95.4% 95.6% (14,501) 269,368 94.2% 94.4% (1,669) Less: Non-Energy Operating 13,182 4.2% 4.4% 12,514 4.4% 4.4% (667) 15,904 5.6% 5.6% 3,390 Less: Capital Outlay & Debt Service 692 0.2% 686 0.2% (6) 314 0.1% (372) Net Position (bottom line) $16,986 5.4% $0 0.0% (16,986) $450 0.2% 450 Operating Reserve $61,852 $44,866 (16,986) $45,316 450
Reserve as a % of operating expenses 21% 16% 16%
Operating Reserve as of December 31, 2026 $75,977
Reserve % as of December 31, 2026
(Board’s minimum reserve target) 30%
FY2024/25 Reforecast:
Despite a $36.4 million drop in net electricity revenue—driven by the retention of the 2024 rate design and Irvine’s shift from 100% Renewable Choice to Basic Choice—OCPA mitigated the impact by deferring $45 million in revenue from FY 2023/24. This strategy enabled a projected $17 million contribution to the operating reserve, increasing the reserve to $62 million, or 21% of total operating expenses. Additional relief came from lower projected CPUC Market Price Benchmarks (MPBs), effective cost controls, and slower-than-expected hiring, reducing the need for deferred funds to just $15 million and preserving $30 million in the Rate Stabilization Fund. As energy costs are expected to outpace revenues in FY 2025/26, OCPA will deploy the remaining $30 million to maintain rate stability, resulting in a breakeven FY2024/25 budget and a stable operating reserve of $45 million, or 16% of total operating expenses.
FY2025/26 Budget:
To offset an anticipated revenue shortfall—driven by the continued use of 2024 rate design and Irvine’s shift to Basic Choice—OCPA will utilize the remaining $30 million in the Rate Stabilization Fund. Despite increases in system energy and RA costs, total energy costs are projected to decline by $1.7 million, primarily due to an $84 million reduction in PCC1 costs following the suspension of new PCC1 procurement in response to a sharp market price spike in late 2024. Non-energy operating expenses are expected to rise by $3.4 million to support staffing, customer program expansion, and the implementation of a risk management system. The budget forecasts a modest $450k increase in net position, with the operating reserve projected to remain at $45 million by June 30, 2026, and grow to $76 million—or 30% of total operating expenses—by December 31, 2026, meeting the Board’s reserve target.
8 OCPA FY2024/25 and FY2025/26 Operating Budget - Overview 760
Primary Revenue Source: OCPA’s revenue primarily derives from retail electricity sales, driven by generation rates designed to cover power procurement, operating and non-operating expenses, capital expenditures, and contributions to the operating reserve.
Demand Forecast: Total retail load consumption is projected at 2,150 GWh for FY2025/26, including residential and commercial customers from Buena Park, Fullerton, and Irvine.
Data Utilization: Customer counts and load consumption estimates combine actual customer data from SCE and Calpine reports.
2025 OCPA Rates (July through December 2025): Based on the board-approved 2025 Rate Design:
Basic Choice: 3% discount below SCE’s equivalent generation rates.
Smart Choice: Basic Choice + 1c/kWh.
100% Renewable Choice: Basic Choice + 1.5c/kWh.
2026 OCPA Rates (January through June 2026): Guided by the Board-approved OCPA Rate Development Policy. Revenue will ensure coverage of power purchases, operational expenses, debt service, and targeted reserves.
FY2026/27 through FY2030/31 OCPA Rates: Aligned with the Board-approved OCPA Rate Development Policy for long-term financial stability.
Uncollectible Accounts: Reduced from 1.75% to 1.50% of operating, reflecting a low incidence of long-term aging accounts. 9 OCPA Revenue Assumptions – Key Highlights
761
OCPA’s 2025 rate design offers a 3% discount on the Basic Choice renewable energy plan generation rate compared to SCE's equivalent generation rate, providing significant relief to all customers. 10 OCPA Revenue Assumptions – 2025 Rate Design
762
o $45 million in revenue was deferred to the Rate Stabilization Fund from FY2023/24 to FY 2024/25 to offset a projected revenue shortfall.
o This action aligns with the Board-approved Rate Stabilization Policy, which promotes financial stability and customer affordability.
o The 2024 rate design was maintained in 2025, despite SCE’s generation rate decline, to shield customers from rate shock in 2025.
o Irvine’s shift from 100% Renewable Choice to Basic Choice in February 2025 also contributed to revenue impacts. o Financial relief came from a projected decline in the CPUC’s RPS & RA Market Price Benchmarks, combined with disciplined cost controls and slower-than-expected hiring. o Only $15 million of the $45 million deferral is now expected to be used in FY2024/25, leaving $30 million in the Rate Stabilization Fund to protect against future volatility in SCE rates or energy price spikes. o Energy costs in FY2025/26 are projected to exceed revenues; OCPA will proactively deploy the remaining $30 million to maintain rate and operational stability.
o FY2024/25 revenues and expenses are projected to balance at $284 million, resulting in a breakeven ($0) outcome. o Following the $30 million deferral, FY2025/26 net revenue is projected at $286 million – sufficient to fully cover energy and non-energy operating expenses.
OCPA Revenue – Revenue Deferral
11 763
OCPA procures electricity from renewable sources, such as solar and wind, to meet customer demand, with SCE managing delivery, billing, and infrastructure maintenance. OCPA’s energy costs are shaped by market fluctuations, seasonal demand surges (e.g., summer heat waves), and increasing customer load, which may necessitate purchasing additional power at elevated market rates. Regulatory requirements, including California’s Resource Adequacy mandates, require OCPA to secure sufficient energy capacity, potentially raising costs during peak periods. To address these challenges, OCPA employs long-term power purchase agreements and maintains a diverse renewable energy portfolio, ensuring competitive rates while supporting California’s sustainability goals. Below are the key assumptions for FY2025/26 power supply costs:
Cost of Energy Components:
● Energy: Includes system energy, renewable energy (including carbon-free attributes), and CAISO fees, estimated at $225 million or 83% of total power supply cost.
● Resource Adequacy (RA): A reliability obligation requiring committed generating capacity for system reliability, estimated at $45 million or 17% of total power supply cost.
Forecast Contracts: OCPA employs forward contracts to secure energy supply in advance, ensuring resource sufficiency and cost predictability for the budget.
Competitive Net Energy Metering (NEM) program: OCPA maintains NEM 2.0 benefits, offering full retail rate compensation for excess solar generation and Net Surplus Compensation (NSC) at 10% above SCE’s NSC rate. The estimated payout for NEM customers in FY2025/26 is $525,000.
12 OCPA Cost of Energy Assumptions – Key Highlights
764
CAISO forward energy prices for the next 12-month period have continued to decline and are now 28% lower compared to one year ago.
The downward trend is driven by stable natural gas prices and an improving outlook on the supply stack’s ability to meet demand. 13 $-
$20
$40
$60
$80
$100
$120
Dec-24 Jan-25 Feb-25 Mar-25 Apr-25 May-25 Jun-25 Jul-25 Aug-25 Sep-25 Oct-25 Nov-25 Dec-25 $/MWh
Southern California Energy Prices (SP 15)
Dec-23 Feb-24 Jun-24 Aug-24 Dec-24
OCPA Cost of Energy Assumptions – System Energy
765
• PCC1 prices surged 400% from trough to peak over three years, driven by late 2024 market imbalances and rising demand.
• Over the past six months, PCC1 prices have declined by 83%.
• Rising renewable energy costs are reflected in SCE’s
higher VAMO (PCC1) prices, which are based on the
CPUC’s Market Price Benchmarks (MPBs).
• For OCPA, PCC1 from SCE’s VAMO contracts is priced
according to the CPUC’s MPB mechanism. Despite recent
market declines, the MPB continues to reflect elevated or rising renewable energy costs, impacting OCPA’s RPS-
related expenses.
14 $-
$10
$20
$30
$40
$50
$60
$70
$80
$90
$100
Jan 2023 May 2023 Sep 2024 April 2025
PCC1 Renewable Energy Prices ($/MWh)
OCPA Cost of Energy Assumptions – Eligible Renewable Energy 766
Chart shows price changes for 2025 RA volumes from Jan
2023 to present.
Significant price drop observed since the YA deadline in Oct 2024.
2026-2027 RA prices have started to decline but remain
above 2025 levels – primarily due to higher MCAM prices, based on CPUC Market Price Benchmarks.
The new slice-of-day framework may require some portfolio- balancing transactions. The 2025 requirements will be known in July.
15 $-
$20
$40
$60
$80
$100
$120
$140
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
$/kW-mo
Resource Adequacy Prices ($/kW-mo)
Jan 2023 Oct 2023 June 2024 April 2025
OCPA Cost of Energy Assumptions – Resource Adequacy
767
OCPA's operating expenses are categorized into seven categories: Data Management & SCE Service Fees, Staffing Costs, Professional Contracts, Legal & Lobbying Support, Marketing and Outreach, General and Administrative Expenses, and Energy Programs. In addition to these operating costs, the budget includes non-operating debt service expenses, which account for interest and related financing costs. Key assumptions for each expense category are outlined below.
Data Management & SCE Service Fees
• Data Management Services: Provided by Calpine, these services encompass billing data validation, bill coordination with Southern California Edison (SCE), call center operations, customer enrollment database management, move-in/move-out services, and data reporting. Under the contract’s service fee waiver clause, Calpine will waive $217,000 in data management fees. • SCE Services: SCE provides meter reading, data processing, and customer billing services, as mandated by the California Public Utilities Commission (CPUC), with associated fees reflecting these regulatory requirements. $ in thousands
Period Ending June 30 FY2025/26 Budget % of rev
Data Management Fee $2,454
Less: Fee Waiver ($217)
Net Data Management Fee $2,237
1.0%
SCE Service Fee $480
Customer Accounts 179,000
16 CCA Comparison (3CE, MCE, CPA, SDCP,
and SVCE): Total data management & utilities
service fees range from 0.9% to 1.5% of revenue.
3CE: Central Coast Community Energy
MCE: Marin Clean Energy
CPA: San Diego Community Power
SDCP: San Diego Community Power
SVCE: Silicon Valley Clean Energy
Operating Expenses Highlights: Data Management & SCE Service Fees 768
Staffing costs include salaries, payroll taxes, benefits for staff, and board member stipends. The projections account for anticipated cost-of-living adjustments (COLA), recruitment of new positions, full-year financial impacts of existing staff, merit- based salary increases, and changes in employee benefits. Approximately $33,000 in staffing expenses are eligible for reimbursement through funding from the Equitable Building Decarbonization Direct Install (EBD-DI) Program. These salary projections will be further refined during the FY2025/26 Mid-Year Budget Update to reflect actual expenditures.
Approved Staffing – FY2024/25: The current fiscal year includes 29 full-time equivalents (FTEs) and 2 interns.
Proposed Staffing Strategy - FY2025/26: To support the agency’s continued operational needs, OCPA will reclassify two existing positions. The total number of FTE positions will remain at 29 for FY2025/26. 17 Operating Expenses Highlights: Staffing Costs
769
Reclassifications
To align staff responsibilities with organizational needs and support agency growth, OCPA proposes reclassifying two existing positions within the Administrative Services Department. These updates reflect the evolving scope of duties and ensure compensation is equitable and competitive.
Administrative Services Manager
Current Title: Management Analyst
Department: Administrative Services
Recommended Salary Grade: HR/Administration – Manager (HA4) Recommended Salary Range: $119,800 to $172,600 annually Salary Adjustment Recommendation: To promote internal equity and maintain staff morale, OCPA recommends adjusting the salary range of Grade HA4 from $114,700–$165,200 to $119,800–$172,600. This aligns HA4 with the current salary range of the Management Analyst position, classified under Marketing/Program Management – Senior Professional (MP3).
Role & Responsibilities: This position will oversee key administrative functions including human resources, information technology, and office operations. The reclassification reflects the expanded scope and complexity of the role, which is critical to maintaining efficiency and supporting OCPA’s evolving organizational needs. 18 Operating Expenses Highlights: Staffing Costs
770
Reclassifications
Office Manager/Receptionist
• Current Title: Administrative Assistant
• Department: Administrative Services
• Recommended Salary Grade: HR/Administration – Intermediate Professional (HA2) • Board-Approved Salary Range: $69,500 – $100,100 annually • Role & Responsibilities: This position will serve as the primary point of contact for visitors and staff, managing front-desk reception, office logistics, internal communication support, and general clerical duties. The reclassification reflects the role’s increased responsibility in maintaining a professional and organized office environment and supporting overall administrative operations. 19 Operating Expenses Highlights: Staffing Costs
771
20 FY2025/26 Budget Assumption – Proposed Organizational Chart 772
OCPA proposes to continue offering a Cost-of-Living Adjustment (COLA) for full-time employees, effective January 1, 2026, to help offset the effects of inflation. The adjustment will be based on the April 2025 Consumer Price Index (CPI) for the Los Angeles-Long Beach-Anaheim area and will result in updated budgetary salary pay ranges to reflect the approved COLA.
For FY2025/26, the COLA is budgeted at 3%. Full-time employees hired before December 1, 2025, will receive the adjustment on a pro-rata basis. For example, an employee hired in July 2025 will receive a 1.5% COLA (50% of the full 3% adjustment), while those hired on or after January 1, 2026, will not receive a COLA in that cycle.
$ in thousands
Period Ending June 30 FY2025/26 Budget % of total % of rev Salaries $4,883 78.6%
Benefits $998 16.1%
Board Stipends & Misc. $116 1.9%
Payroll Taxes $110 1.8%
COLA $106 1.7%
Total Staffing Costs $6,212 100% 2.2%
Total FTEs 29
Estimated Customer Accounts
per FTE
6,200
21 CCA Comparison (3CE, MCE, CPA, SDCP, and SVCE): Total staffing costs range from 1.5% to 3.5% of revenue.
Operating Expenses Highlights: Cost-of-Living Adjustments (COLA) 773
OCPA follows industry best practices by leveraging external consultants while progressively building internal staffing capacity to handle non-technical tasks.
This strategic approach ensures operational efficiency and cost-effectiveness as OCPA transitions to greater self-reliance. Contract services include the following professional support services:
• Energy Procurement and Portfolio Management: Encompasses power supply portfolio and risk management, short and long-term energy procurement and contracting, load forecasting, integrated resource planning, scheduling coordination, Congestion Revenue Rights (CRR) purchases and sales, and California Independent System Operator (CAISO) settlements and reporting. • Financial and Other Services: Includes accounting, annual financial audit, rate strategy development, SCE General Rate Case (GRC) assessments, SCE Energy Resource Recovery Account (ERRA) forecast reviews, information technology support, cybersecurity services, human resources, credit rating development, and banking services.
$ in thousands
Period Ending June 30 FY2025/26 Budget % of rev
Energy Procurement and Portfolio Management $714
Accounting, Auditing & Banking $332
IT, HR, Credit Rating Strategies & Related $269
Rate Strategies & Assessments $247
Total Professional Contracts $1,562 0.5%
22 CCA Comparison (3CE, MCE, CPA, SDCP, and SVCE): Total professional contract costs range from 0.3% to 1.4% of revenue.
Operating Expenses Highlights: Professional Contracts
774
OCPA engages legal services to support its operations, governance, and advocacy efforts. These services include general and special counsel representation, support for power supply procurement transactions and negotiations, participation in regulatory proceedings (e.g., SCE’s ERRA Applications, SCE GRC assessment, and other compliance obligations), non-energy contracting support, employment matters, governance and general liability management, clerk support, and regulatory and legislative advocacy.
In January 2026, OCPA plans to hire a Sacramento-based lobbyist to enhance its advocacy efforts. The lobbyist will provide insights into legislative sessions and specific bills, strengthen engagement with the California State Legislature and state departments, and amplify OCPA’s voice in shaping policies that support clean energy and community power initiatives.
$ in thousands
Period Ending June 30 FY2025/26 Budget % of rev
General Counsel $294
Regulatory & Legislative $110
Clerk Support $104
Power Procurement Transactional &
Negotiation
$100
Labor Related $98
Sacramento Lobbying Support $50
Total Legal & Lobbying Support
Services
$756 0.3%
Additional In-House Legal FTEs None
23 CCA Comparison (3CE, MCE, CPA, and SDCP): Total legal & lobbying support services costs range from 0.1% to 0.3% of revenue.
Operating Expenses Highlights: Legal & Lobbying Support Services 775
As a community-focused public agency, OCPA prioritizes meaningful engagement with its customers to build trust, strengthen relationships, and advance its mission of delivering clean, affordable energy. Through a variety of communication channels, OCPA actively connects with local communities to raise awareness of OCPA, educate the public on the benefits of community choice energy, and promote sustainability initiatives. These efforts ensure that residents and businesses across Orange County are well-informed about OCPA’s role in supporting environmental stewardship.
The FY2025/26 Marketing and Outreach budget supports these goals by funding mandatory notifications, such as Joint Rate Comparisons, to ensure compliance, as well as marketing and public education campaigns designed to enhance brand recognition and public confidence. Additionally, the budget provides for sponsorships of community events and partnerships with local organizations, along with targeted outreach to promote OCPA’s clean energy programs. These efforts reinforce OCPA’s commitment to transparent communication and to cultivating an engaged, environmentally conscious community. $ in thousands
Period Ending June 30 FY2025/26 Budget % of rev
Marketing & Communications Consulting $734
Direct Mailers & Postage $412
Advertising & Paid Media $266
Sponsorships & Memberships $149
Translation, Website Enhancement & Related $67
Promotions & Branding $22
Total Marketing & Outreach $1,650 0.6%
24 CCA Comparison (3CE, MCE, CPA, SDCP, and SVCE): Total marketing & outreach costs range from 0.1% to 0.4% of revenue.
Operating Expenses Highlights: Marketing & Outreach
776
General & Administrative (G&A) expenses support OCPA’s daily operations and include office rent and lease amortization (in accordance with Governmental Accounting Standards Board (GASB) Statement No. 87), maintenance, insurance, bank fees, and office supplies. This category also covers IT equipment and software, including OCPA’s energy portfolio risk management and data analytics systems, which enhance market intelligence, optimize the power portfolio, mitigate risks, and ensure regulatory compliance.
Discretionary spending for conferences, professional development, travel, and business meals is managed prudently. G&A expenses also include dues for California Community Choice Association (CalCCA) and the California Community Choice Financing Authority (CCCFA) to support industry engagement and potential green bond prepayment opportunities. $ in thousands
Period Ending June 30 FY2025/26 Budget % of rev
CalCCA Membership Due $420
OCPA Energy Portfolio Risk Management & Data Analytics Systems $397 Office Rental and Lease Amortization $224
Bank and Commitment Fees $180
Business Insurance $120
IT Equipment and Software $93
CCCFA Membership Due $70
Discretionary Spending:
Conferences, Professional Development & Travel $146
Business Meals $37
Other Ordinary Business Expenses $100
Total General & Administrative Expenses $1,787 0.6%
• CalCCA advocates on behalf of California’s community choice aggregators (CCAs) before the state legislature and regulatory agencies. • CCCFA supports its member CCAs by offering prepayment financing structures designed to lower the cost of power procurement. • CCA Comparison (3CE, MCE, CPA, SDCP, and SVCE): Total general & administrative expenses range from 0.4% to 1.1% of revenue.25 Operating Expenses Highlights: General & Administrative Expenses 777
OCPA is committed to reinvesting in the community through energy programs that directly support its customers. These programs are designed to address the specific energy needs of households and businesses while advancing the transition from fossil fuels to clean energy solutions.
As part of this commitment, OCPA has launched the Community Power Plan (CPP) to better understand the unique priorities of its member communities, ensuring that future programs are responsive and impactful. Continued support is also planned for community grant initiatives that promote clean energy education, as well as ongoing efforts such as the OCPA Marketplace, which offers discounts on energy-efficient products for the home.
26 $ in thousands
Period Ending June 30 FY2025/26 Budget % of rev
OCPA CPP Programs Development $100
OCPA Programs:
OCPA CPP Programs $745
EV Charger and Solar Battery Rebate Programs $218
OC Bright Futures Grant $100
OCPA Marketplace and Incentive Finder $58
Total Energy Programs $1,221 0.4%
CCA Comparison (3CE, MCE, CPA, and SVCE): Total energy programs costs range from 1.1% to 10.4% of revenue.
Operating Expenses Highlights: Energy Programs
778
The Equitable Building Decarbonization Direct Install (EBD-DI) Program, administered by the California Energy Commission (CEC), is a statewide initiative funded by state and federal sources to support the installation of all-electric appliances, energy efficiency measures, and weatherization upgrades in low-income households across under-resources communities.
As a partner, OCPA conducts culturally relevant outreach and education, facilitates participant handoffs, gathers feedback through follow-up surveys, and submits monthly reports to the Program Implementer.
OCPA has been awarded $771k to support the EBD-DI Program, with $474k allocated for OCPA-led activities and $297k for subcontractor outreach. For FY2025/26, reimbursable labor and travel expenses are projected at $34k, with no impact on OCPA’s budget. 27 $ in thousands
Period Ending June 30 FY2025/26 Budget % of rev
EBD-DI Program Grant Income $34
Reimbursable Expenses:
Direct Labor and Fridge Benefits ($33)
Travel ($1)
Total EBD-DI Program Fund Impact $0 0%
Operating Expenses Highlights: Equitable Building
Decarbonization Direct Install Grant
779
Debt service includes interest costs on the $7.5 million loan from the City of Irvine, as well as imputed interest on OCPA’s office lease. The lease-related interest is calculated in accordance with Governmental Accounting Standards Board (GASB) Statement No. 87, which requires the net present value of lease obligations to be capitalized and amortized over the lease term.
$ in thousands
Period Ending June 30 FY2025/26 Budget % of rev
Interest Costs – City of Irvine $265
Interest Costs – OCPA’s Office Lease $49
Total Debt Services $314 0.1%
28 CCA Comparison (MCE and SDCP): Total debt services costs range from 0.1% to 0.7% of revenue.
Operating Expenses Highlights: Debt Services
780
29 5-Year OCPA Financial Proforma
FY2026/27 to 2030/31
($ in thousands)
Period Ending Jun 30
Reforecast
FY2024/25 % of Rev
Budget
FY2025/26 % of Rev
Projection
FY2026/27 % of Rev
Projection
FY2027/28 % of Rev
Projection
FY2028/29 % of Rev
Projection
FY2029/30 % of Rev
Projection
FY2030/31 % of Rev
REVENUE AND OTHER SOURCES
Revenue - Electricity Base 248,064 87.3% 246,322 86.1% 289,120 97.0% 306,105 96.9% 307,355 96.9% 309,504 96.9% 312,014 96.9% Revenue - Smart Choice Premium 5,257 1.8% 7,430 2.6% 6,543 2.2% 5,001 1.6% 5,022 1.6% 5,064 1.6% 5,104 1.6% Revenue - 100% Renewable Premium 16,008 5.6% 3,252 1.1% 4,048 1.4% 6,644 2.1% 6,672 2.1% 6,728 2.1% 6,781 2.1% Less: Uncollectible Accounts (4,713) (1.8%) (3,855) (1.5%) (4,496) (1.5%) (4,766) (1.5%) (4,786) (1.5%) (4,819) (1.5%) (4,858) (1.5%) Revenue deferral 15,112 29,888 0 0 0 0 0
Net Revenue - Electricity 279,728 98.4% 283,037 99.0% 295,215 99.0% 312,983 99.1% 314,263 99.1% 316,476 99.1% 319,041 99.1% Investment and Miscellaneous Income 4,510 1.6% 3,000 1.0% 3,000 1.0% 3,000 0.9% 3,000 0.9% 3,000 0.9% 3,000 0.9% Total Net Revenue and Other Sources 284,238 100.0% 286,037 100.0% 298,215 100.0% 315,983 100.0% 317,263 100.0% 319,476 100.0% 322,041 100.0%
EXPENDITURES AND OTHER USES
CURRENT EXPENDITURES
Cost of Energy 271,038 95.4% 269,368 94.2% 260,317 87.3% 259,399 82.1% 265,720 83.8% 267,633 83.8% 270,720 84.1% Data Manager 1,831 0.6% 2,237 0.8% 2,668 0.9% 2,790 0.9% 2,865 0.9% 2,942 0.9% 3,021 0.9% Utilities Service Fees 456 0.2% 480 0.2% 525 0.2% 540 0.2% 540 0.2% 540 0.2% 540 0.2% Staffing Costs 4,560 1.6% 6,212 2.2% 7,415 2.5% 8,194 2.6% 9,010 2.8% 9,868 3.1% 10,768 3.3% Contract Services 1,521 0.5% 1,562 0.5% 1,525 0.5% 1,458 0.5% 1,477 0.5% 1,502 0.5% 1,529 0.5% Legal Services 506 0.2% 756 0.3% 843 0.3% 881 0.3% 922 0.3% 922 0.3% 922 0.3% Marketing and Outreach 1,726 0.6% 1,650 0.6% 1,731 0.6% 1,817 0.6% 1,906 0.6% 2,001 0.6% 2,099 0.7% Other G&A 1,328 0.5% 1,787 0.6% 2,102 0.7% 2,101 0.7% 2,132 0.7% 2,190 0.7% 2,250 0.7% Energy Programs 586 0.2% 1,221 0.4% 1,183 0.4% 1,438 0.5% 1,693 0.5% 1,949 0.6% 2,205 0.7% 283,552 99.8% 285,272 99.7% 278,309 93.3% 278,618 88.2% 286,266 90.2% 289,547 90.6% 294,055 91.3%
OTHER USES
Capital Outlay 377 0.1% 0 0.0% 0 0.0% 0 0.0% 0 0.0% 0 0.0% 0 0.0% Total Other Uses 377 0.1% 0 0.0% 0 0.0% 0 0.0% 0 0.0% 0 0.0% 0 0.0%
DEBT SERVICE
Interest costs - nonoperating 309 0.1% 314 0.1% 196 0.1% 35 0.0% 26 0.0% 16 0.0% 5 0.0% Finance costs - Principal 0 0.0% 0 0.0% 2,528 0.8% 0 0.0% 0 0.0% 0 0.0% 0 0.0% Total Expenditures and Other Uses 284,238 100.0% 285,587 99.8% 281,033 94.2% 278,653 88.2% 286,292 90.2% 289,562 90.6% 294,060 91.3% Net Income Surplus/(Deficit) 0 0.0% 450 0.2% 17,181 5.8% 37,331 11.8% 30,971 9.8% 29,914 9.4% 27,981 8.7% Reserve Balance:
Carryover balance 44,866 15.8% 44,866 15.7% 45,316 15.2% 62,498 19.8% 99,828 31.5% 130,799 40.9% 160,713 49.9% Net Income Surplus/(Deficit) 0 0.0% 450 0.2% 17,181 5.8% 37,331 11.8% 30,971 9.8% 29,914 9.4% 27,981 8.7% Ending balance 44,866 45,316 62,498 99,828 130,799 160,713 188,694 % of operating expenses 16% 16% 22% 36% 46% 56% 64%
Below Target Below Target Below Target Below Target Below Target 781
30 SCE PCIA/Gen
rates uncertainty
Power prices are near
record high levels, volatile
market, scare RA supply
during summer months
Customer defaults,
collateral postings
Regulatory & legislative
uncertainty, central buyer,
direct access, PSPS
Rate increases will
ultimately impact
IOU
RATES
POWER
SUPPLY
SHOCKS
CUSTOMER
PAYMENTS
REG &LEG
ISSUES
RATE
AFFORDABILITY
OCPA Operating Reserves
Maintaining a healthy operating reserve to absorb numerous risks PCIA/Gen rates
uncertainty
Record high power prices, volatile
market, scarce RA supply during
summer months, collateral
postings
Customer defaults
in the event of an
economic downturn
Regulatory & Legislative
uncertainty, IRP , RPS, RA
reform, PCIA, direct
access, POLR
Energy price
increases will
impact usage and
electrification
Possibility of incurring
significant financial risks
CHANGE IN
MEMBER
PARTICIPATION
FY24/25 Projected Reserve
$45mil or 16% of total
operating budget expenses
Starting 12/2026 Projected Reserve
30%-50% of total operating budget
expenses
782
31 OCPA maintains an Operating Reserve as part of its long-term financial strategy to achieve an investment-grade credit rating and secure cost-effective energy procurement, promoting fiscal responsibility and operational resilience. The reserve targets 30%-50% of total operating expenses to buffer against external risks such as changes in member participation, fluctuations in SCE generation rates and the Power Charge Indifference Adjustment (PCIA), rising renewable and Resource Adequacy (RA) prices, customer payment defaults, regulatory uncertainties, and market volatility that could impact energy use and electrification goals.
As of December 2026, OCPA’s 4th year of full operations, the Operating Reserve is projected to reach $76 million, equal to 30% of total operating budget expenditures, strengthening financial stability and advancing OCPA’s clean energy mission. 5-Year OCPA Financial Proforma
783
Established in November 2020 as a Joint Powers Authority, OCPA provides electric generation services to residents and businesses in Buena Park, Fullerton, and Irvine through California’s Community Choice Aggregation (CCA) model. Beginning in October 2026, Fountain Valley will also offer its community a choice in electricity generation.
OCPA allows customers to procure electricity from competitive suppliers, with SCE continues to manage transmission and distribution and billing. Focused on reducing greenhouse gas emissions, OCPA promotes local control of renewable energy, offers affordable rates, and delivers innovative energy programs. By supporting economic development, advancing clean energy, and ensuring long-term rate stability, OCPA helps build a sustainable and resilient energy future for Orange County.
About OCPA
784
Councilmember
City of Buena Park
2025 OCPA Board
Susan Sonne
Chair
James Mai
Vice Chair
Vice Mayor
City of Irvine
Fred Jung
Director
Mayor
City of Fullerton
Glenn Grandis
Director
Councilmember
City of Fountain Valley
William Go
Director
Councilmember
City of Irvine
785
CITY OF COSTA MESA
Agenda Report
77 Fair Drive
Costa Mesa, CA 92626
File #: 25-389 Meeting Date: 9/2/2025
TITLE:
AWARD OF THE FAIRVIEW ROAD ACTIVE TRANSPORTATION AND REHABILITATION PROJECT, CITY PROJECT NO. 25-10, STATE PROJECT NO. CRASL-5312(106), AND FINDING
OF CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA) CATEGORICAL EXEMPTION DEPARTMENT: PUBLIC WORKS DEPARTMENT/ENGINEERING DIVISION PRESENTED BY: RAJA SETHURAMAN, PUBLIC WORKS DIRECTOR
CONTACT INFORMATION: SEUNG YANG, P.E., CITY ENGINEER (714) 754-5335 RECOMMENDATION:
Staff recommends the City Council:
1. Make a finding of California Environmental Quality Act (CEQA) categorical exemption pursuant to CEQA Guidelines section 15301.
2. Adopt plans, specifications, and working details for the Fairview Road Active Transportation and Rehabilitation Project, City Project No. 25-10, State Project No. CRASL-5312(106).
3. Award a Public Works Agreement (PWA) for construction to Hardy & Harper, Inc., 32 Rancho Circle, Lake Forest, California 92630, in the amount of $2,860,000, and authorize a ten percent (10%) contingency in the amount of $286,000 for unforeseen costs related to this project.
4. Authorize the Interim City Manager and the City Clerk to execute the PWA for Hardy & Harper, Inc., and future amendments to the agreement within Council authorized limits.
ENVIRONMENTAL DETERMINATION:
The proposed action is exempt from the California Environmental Quality Act (CEQA). The action involves an organizational or administrative activity of government that will not result in the direct or indirect physical change in the environment. In addition, the proposed action is exempt under section 15301 relating to the operation, repair, maintenance, permitting, and/or minor alteration of existing public facilities.
BACKGROUND:
The Fairview Road Active Transportation and Rehabilitation Project (from Fair Drive to Newport Boulevard) is an Active Transportation improvement project with street pavement rehabilitation.
786
File #: 25-389 Meeting Date: 9/2/2025
This stretch of Fairview Road will be newly constructed with improved Class IV cycle tracks and green conflict zones that will include high-visibility crosswalks at major intersections. These proposed striping improvements are consistent with the City’sActive Transportation Plan (ATP) in achieving bicycle connectivity and expanding the City’s continuing bicycle networks.
Included in this project will be new median landscaping, tree plantings, and conversion of two existing bus stops to concrete bus boarding islands. In addition, a new High-Intensity Activated Crosswalk (HAWK) signal will be installed near the midpoint of Fairview Road between Fair Drive and Wilson Street. The HAWK signal will allow for a new designated crossing for pedestrians and bicyclists at the bus boarding islands, as well as improved access to College Park Elementary School.
Parkway and street rehabilitation will include removal and reconstruction of damaged concrete parkways (e.g., curb and gutter, sidewalk, and curb ramps), pavement sections, milling and overlaying with new asphalt, adjustment of utility and manhole covers to grade, and implementation of traffic control.
The contractor is required to complete all the tasks necessary to perform the scope of work as outlined in the contract documents, plans, and specifications. A copy of the specifications and working details is available for review in the Office of the City Clerk.
787
File #: 25-389 Meeting Date: 9/2/2025
ANALYSIS:
The City received and opened ten (10) bids for this project on May 7, 2025. Hardy & Harper, Inc., the apparent lowest bidder, submitted a bid proposal in the amount of $2,860,000. The average of the ten (10) bids received amounted to $3,188,525. The bid results are included as Attachment 1.
The license and references of Hardy & Harper have been checked, and staff has found them to be in good standing.
Hardy & Harper has successfully completed other projects in the City of Costa Mesa, such as the Fairview Road Highway Safety Improvement Project (HSIP) from Baker Street to Adams Avenue.
Upon City Council award of the PWA (Attachment 2), Hardy & Harper will furnish the necessary bonds and insurance, which will be approved as to form by Risk Management. After the award and subsequent execution of the agreement, a “Notice to Proceed” will be issued.
ALTERNATIVES:
The alternative to this Council action would be to reject all bids, re-advertise, and re-bid the construction project. Staff has determined that re-advertising and re-bidding the project will not result in lower bids and will delay the project.
FISCAL REVIEW:
Funding for the Fairview Road Active Transportation and Rehabilitation Project inclusive of the contingency in the amount of $3,146,000 is available in Fiscal Year 2025-26 budget in multiple funds, including Gas Tax Fund (201), Traffic Impact Fees Fund (214), Federal Grant Fund (230), and Measure M2 Fairshare Fund (416).
LEGAL REVIEW:
The City Attorney’sOffice has reviewed this agenda report, prepared the PWA, and approves them both as to form.
CITY COUNCIL GOALS AND PRIORITIES:
This project works toward achieving the following City Council goals:
· Maintain and Enhance the City’s Facilities, Equipment and Technology · Strengthen the Public’s Safety and Improve the Quality of Life CONCLUSION:
Staff recommends the City Council:
1. Make a finding of California Environmental Quality Act (CEQA) categorical exemption pursuant to CEQA Guidelines section 15301.
2. Adopt plans, specifications, and working details for the Fairview Road Active Transportation and Rehabilitation Project, City Project No. 25-10, State Project No. CRASL-5312(106).
788
File #: 25-389 Meeting Date: 9/2/2025
3. Award a Public Works Agreement (PWA) for construction to Hardy & Harper, Inc., 32 Rancho Circle, Lake Forest, California 92630 in the amount of $2,860,000, and authorize a ten percent (10%) contingency in the amount of $286,000 for unforeseen costs related to this project.
4. Authorize the Interim City Manager and the City Clerk to execute the PWA for Hardy & Harper, Inc., and future amendments to the agreements within Council authorized limits.
789
City
Lake Forest, CA
Corona, CA
Orange, CA
Woodland Hills, CA
San Clemente, CA
Long Beach, CA
Santa Fe Springs, CA
Woodland Hills, CA
Irvine, CA
Chino, CA
AVERAGE BID:
LOWEST
RESPONSIVE BID:
KASA Construction, Inc.
All American Asphalt
DASH Construction Company, Inc.
R.J. Noble Company, Inc.
Hardy & Harper, Inc.
PALP dba Excel Paving Company
Sequel Contractors, Inc.
Environmental Construction, Inc.
FEC Future Contractors and Engineers, Inc.
Diamond Construction
Bidder
CITY OF COSTA MESA
PUBLIC WORKS DEPARTMENT
FAIRVIEW ROAD ACTIVE TRANSPORTATION AND REHABILITATION PROJECT STATE PROJECT NO. CRASL-5312(106), CITY PROJECT NO. 25-10 BID OPENING DATE: MAY 7, 2025
Total Bid
$2,860,000.00
$3,133,313.00
$2,949,650.00
$2,948,112.00
$2,996,337.00
$2,860,000.00
$3,187,800.00
$3,541,267.90
$3,193,450.00
$3,188,525.29
$3,755,450.00
$3,319,873.00
PAGE 1 OF 1
ATTACHMENT 1
790
1 CITY OF COSTA M
ESA
PUBLIC WORKS AGREEME
NT FOR
CITY PROJECT NO. 25-10
STATE FUNDED, PROJECT NO. CRASL-5312(106)
THIS PUBLIC WORKS
AGREEMENT (“Agreement”), dated September 2nd, 2025
(“Effective Date”), is made by the CITY OF COSTA MESA, a political subdivision of the State of California (“CITY”), and Hardy & Harper, Inc. , a California corporation (“CONTRACTOR”).
WHEREAS,
CITY desires to construct the public improvements described below under Paragraph 1, Scope of Work (the “Project”); and
WHEREAS,
CITY has determined that CONTRACTOR is the lowest responsible bidder; and
WHEREAS, CITY now
desires to contract with CONTRACTOR to furnish
construction and related services for the Project; and
WHEREAS,
CITY and CONTRACTOR desire to set forth their rights, duties and liabilities in connection with the services to be performed.
NOW, THERE
FORE, for and in consideration of the covenants and conditions contained herein, the parties hereby agree as follows:
1. SCOPE OF WORK.
The scope of work gener
ally consists of street improvements along Fairview Road between Fair Drive and Newport Boulevard (the “Work”).
The Work is furt
her described in the “Contract Documents” referred to below.
The Project is
known as the Fairview Road Improvement Project (Fair Drive to Newport Boulevard), City Project No. 25-10 (the “Project”) and State Funded, Project No.
CRASL-5312(106).
2. CONTRACT DOCUMENT
S.
The complete Agreement
consists of the following documents relating to the
Project:
(a) This Agreement;
(b) CONTRACTO
R’s bid, attached hereto as Exhibit A and incorporated herein; ATTACHMENT 2
791
Project and Specification No. 25-10
2 (c) Bid package , including, but not limited to, notice inviting bids, Program Supplement No. 00000A510 to Administering Agency-State Agreement for State Funded Projects No. 12- 5312S21, Master Agreement Administering Agency -State Agreement State-Funded Projects, all addenda to notice inviting bids, complete plans, profiles, detailed drawings and specifications, general provisions and special provisions. The bid package is attached hereto as Exhibit B and incorporated herein;
(a) Faithful Performance Bond and Labor and Material Bond, including agent’s Power of Attorney for each bond, attached hereto as Exhibit C;
(b) Drug-Free Workplace Policy, attached hereto as Exhibit D and incorporated herein; and
(c) Provisions of the most current edition of The Greenbook: Standard Specifications for Public Works Construction (“The Greenbook”). Provisions of The Greenbook are incorporated by this reference as if fully set forth herein.
The documents comprising the complete Agreement will be referred to as the “Contract Documents.”
All of the Contract Documents are intended to complement one another, so that any Work called for in one and not mentioned in another is to be performed as if mentioned in all documents.
In the event of an inconsistency in the Contract Documents, the terms of this Agreement shall prevail over all other Contract Documents. The order of precedence between the remaining Contract Documents shall be as set forth in The Greenbook.
The Contract Documents constitute the entire agreement between the parties and supersede any and all other writings and oral negotiations.
3. CITY’S REPRESENTATIVE.
The CITY’s Representative is Ramin Nikoui, referred to herein as the Project Manager (“Project Manager”).
4. CONTRACTOR’S PROJECT MANAGER; PERSONNEL.
(a) Project Manager. CONTRACTOR’s Project Manager must be approved by City. Such approval shall be at CITY’s sole discretion.
(b) Personnel. CITY has the right to review and approve any personnel who are assigned to perform work under this Agreement. CONTRACTOR shall remove personnel from performing work under this Agreement if requested to do so by CITY.
This Paragraph 4 is a material provision of the Agreement. 792
Project and Specification No. 25-10
3 5. SCHEDULE.
All Work shall be performed in accordance with the schedule approved on behalf of CITY by the Project Manager, and in accordance with the time of performance set forth in Paragraph 11 (Time of Performance).
6. EQUIPMENT - PERFORMANCE OF WORK.
CONTRACTOR shall furnish all tools, equipment, apparatus, facilities, labor and materials necessary to perform and complete the Work in a good and workmanlike manner in strict conformity with the Contract Documents.
The equipment, apparatus, facilities, labor and material shall be furnished and such Work performed and completed as required in the plans and specifications to the satisfaction of the Project Manager or his or her designee, and subject to his or her approval.
7. COMPENSATION.
CITY shall pay CONTRACTOR in accordance with the fee schedule set forth in CONTRACTOR’s bid. CONTRACTOR’s total compensation shall not exceed Two Million Eight Hundred Sixty Thousand Dollars ($2,860,000.00).
8. ADDITIONAL SERVICES.
CONTRACTOR shall not receive compensation for any services provided outside the scope of the Contract Documents unless such additional services, including change orders, are approved in writing by CITY prior to CONTRACTOR performing the additional services.
It is specifically understood that oral requests or approvals of such additional services, change orders or additional compensation and any approvals from CITY shall be barred and are unenforceable.
9. PAYMENTS TO CONTRACTOR.
On or before the last Monday of each and every month during the performance of the Work, CONTRACTOR shall meet with the Project Manager or his or her designee to determine the quantity of pay items incorporated into the improvement during that month.
A “Progress Payment Order” will then be jointly prepared, approved, and signed by the Project Manager and the CONTRACTOR setting forth the amount to be paid and providing for a five percent (5%) retention. Upon approval of the progress payment order by the Project Manager, or his or her designee, it shall be submitted to CITY’s Finance Department and processed for payment by obtaining approval from the City Council to issue a warrant.
793
Project and Specification No. 25-10
4 Within three (3) days following City Council’s approval to issue a warrant, CITY shall mail to CONTRACTOR a warrant for the amount specified in the progress payment order as the amount to be paid. The retained five percent (5%) shall be paid to CONTRACTOR thirty-five (35) days after the recording of the Notice of Completion of the Work by the CITY with the Orange County Clerk-Recorder and after CONTRACTOR has furnished releases of all claims against CITY by persons who furnished labor or materials for the Work, if required by CITY.
Upon the request of CONTRACTOR and at its expense, securities equivalent to the amount withheld pursuant to the foregoing provisions may be presented to CITY for substitution for the retained funds. If CITY approves the form and amount of the offered securities it will release the retained funds and will hold the securities in lieu thereof.
CONTRACTOR shall be entitled to any interest earned on the securities.
In the event that claims for property damage or bodily injury are presented to CITY arising out of CONTRACTOR’s or any subcontractor’s work under this Agreement, CITY shall give notice thereof to CONTRACTOR, and CONTRACTOR shall have thirty-five (35) days from the mailing of any such notice to evaluate the claim and to settle it by whole or partial payment, or to reject it, and to give notice of settlement or rejection to CITY. If CITY does not receive notice within the above-mentioned 35-day period that the claim has been settled, and if the Project Manager, after consultation with the City Attorney, determines that the claim is meritorious, CITY may pay the claim or a portion of it in exchange for an appropriate release from the claimant, and may deduct the amount of the payment from the retained funds that would otherwise be paid to CONTRACTOR upon completion of the Work; provided, however, that the maximum amount paid for any one claim pursuant to this provision shall be One Thousand Dollars ($1,000.00), and the maximum amount for all such claims in the aggregate paid pursuant to this provision shall be Five Thousand Dollars ($5,000.00).
10. PROMPT PAYMENT OF SUBCONTRACTORS.
CONTRACTOR agrees to pay each subcontractor under this Agreement for satisfactory performance of its contract no later than seven (7) days from the receipt of each payment the CONTRACTOR receives from CITY.
CONTRACTOR agrees further to release retainage payments to each subcontractor within thirty (30) days after the subcontractor’s work is satisfactorily completed.
Any delay or postponement of payment from the above referenced time frame may occur only for good cause following written approval of the CITY.
11. TIME OF PERFORMANCE.
CONTRACTOR shall commence Work by the date specified in CITY’s Notice to 794
Project and Specification No. 25-10
5 Proceed, unless a later date is agreed upon in writing by the parties. The Work shall be completed within Ninety-Five (95) working days from the first day of commencement of the Work.
12. TERMINATION.
(a) Termination for Convenience. CITY may terminate this Agreement at any time, with or without cause, by providing thirty (30) days’ written notice to CONTRACTOR.
(b) Termination for Breach of Contract.
(i) If CONTRACTOR refuses or fails to prosecute the Work or any severable part of it with such diligence as will ensure its timely completion, or if CONTRACTOR fails to complete the Work on time, or if CONTRACTOR, or any subcontractor, violates any of the prov isions of the Contract Documents, the Project Manager may give written notice to CONTRACTOR and CONTRACTOR’s sureties of the CITY’s
intention to terminate this Agreement; and, unless within five (5) days after the serving of that notice, such conduct shall cease and arrangements for the correction thereof be made to the satisfaction of the CITY, this Agreement may be terminated at the option of CITY effective upon CONTRACTOR’s receipt of a second notice sent by the CITY indicating that the CITY has exercised its option to terminate.
(ii) If CONTRACTOR is adjudged bankrupt or files for any relief under the Federal Bankruptcy Code or State insolvency laws, this Agreement shall automatically terminate without any further action or notice by CITY.
(iii) If CONTRACTOR is in breach of any material provision of this Agreement, CITY may immediately terminate this Agreement by providing written notice to CONTRACTOR of same.
13. LIQUIDATED DAMAGES.
In the event the Work is not completed, for any reason, within the time required including any approved extensions of time, and to the satisfaction of the Project Manager, CITY may, in addition to any other remedies, equitable and legal, including remedies authorized by Paragraph 12 (Termination) of this Agreement, charge to CONTRACTOR or its sureties, or deduct from payments or credits due CONTRACTOR, a sum equal to Five Thousand Two Hundred Dollars ($5,200.00) as liquidated damages for each calendar day beyond the date provided for the completion of such work.
The parties hereto agree that the amount set forth above, as liquidated damages constitutes a fair and reasonable estimate of the costs the CITY would suffer for each day that the CONTRACTOR fails to meet the performance schedule. The parties hereby agree and acknowledge that the delays in the performance schedule will cause CITY to 795
Project and Specification No. 25-10
6 incur costs and expenses not contemplated by this Agreement.
14. PERFORMANCE BY SURETIES.
In the event CONTRACTOR fails or refuses to perform the Work, CITY may provide CONTRACTOR with a notice of intent to terminate as provided in Paragraph 12 (Termination), of this Agreement. CITY shall immediately give written notice of such intent to terminate to CONTRACTOR and CONTRACTOR’s surety or sureties, and the sureties shall have the right to take over and perform this Agreement; provided, however, that the sureties must, within five (5) days after CITY’s giving notice of termination, (a) give the CITY written notice of their intention to take over the performance of this Agreement; (b) provide adequate assurances, to the satisfaction of the CITY, that the Work shall be performed diligently and in a timely manner; and (c) must commence performance thereof within five (5) days after providing notice to the CITY of their intention to take over the Work. Upon the failure of the sureties to comply with the provisions set forth above, CITY may take over the Work and complete it, at the expense of CONTRACTOR , and the CONTRACTOR and the sureties shall be liable to CITY for any excess costs or damages including those referred to in Paragraph 13 (Liquidated Damages), incurred by CITY. In such event, CITY may, without liability for so doing, take possession of such materials, equipment, tools, appliances, Contract Documents and other property belonging to CONTRACTOR as may be on the site of the Work and reasonably necessary therefor and may use them to complete the Work.
15. DISPUTES PERTAINING TO PAYMENT FOR WORK.
Should any dispute arise respecting whether any delay is excusable, or its duration, or the value of the Work done, or of any Work omitted, or of any extra Work which CONTRACTOR may be required to do, or respecting any payment to CONTRACTOR during the performance of this Agreement, such dispute shall be decided by the Project Manager, and his or her decisions shall be final and binding upon CONTRACTOR and its sureties.
16. SUPERINTENDENCE BY CONTRACTOR.
At all times during performance of the Work, CONTRACTOR shall give personal superintendence or have a competent foreman or superintendent on the worksite, with authority to act for CONTRACTOR.
17. INSPECTION BY CITY.
CONTRACTOR shall at all times maintain proper facilities and provide safe access for inspection by CITY to all parts of the Work and to all shops on or off -site where the Work or portions of the Work, are in preparation. CITY shall have the right of access to the premises for inspection at all times. However, CITY shall, at all times, comply with CONTRACTOR’s safety requirements on the job site.
796
Project and Specification No. 25-10
7 18. CARE OF THE WORK AND OFF-SITE AUTHORIZATION.
CONTRACTOR warrants that it has examined the site of the Work and is familiar with its topography and condition, location of property lines, easements, building lines and other physical factors and limitations affecting the performance of this Agreement.
CONTRACTOR, at CONTRACTOR’s sole cost and expense, shall obtain any permission, and all approvals, licenses, or easements necessary for any operations conducted off the premises owned or controlled by CITY. CONTRACTOR shall be responsible for the proper care and protection of all materials delivered to the site or stored off -site and for the Work performed until completion and final inspection and acceptance by CITY. The risk, damage or destruction of materials delivered to the site or to Work performed shal l be borne by CONTRACTOR.
19. CONTRACT SECURITY AND GUARANTEE.
CONTRACTOR shall furnish, concurrently with the execution of this Agreement, the following: (1) a surety bond in an amount equal to one hundred percent (100%) of the contract price as security for the faithful performance of this Agreement, and (2) a separate surety bond in an amount equal to at least one hundred percent (100%) of the contract price as security for the payment of all persons furnishing labor or materials in connection with the Work under this Agreement. Sureties for each of the bonds and the forms thereof shall be satisfactory to CITY. In addition, such sureties must be authorized to issue bonds in California; sureties must be listed on the latest revision to the U.S.
Department of the Treasury Circular 570; and must be shown to have sufficient bonding capacity to provide the bonds required by the Contract Documents.
CONTRACTOR shall provide a certified copy of the certificate of authority of the surety issued by the Insurance Commissioner; a certificate from the clerk of the county in which the court or officer is located that the certificate of authority of the surety has not been surrendered, revoked, canceled, annulled, or suspended or, in the event that it has, that renewed authority has been granted; and copies of the surety’s most recent annual statement and quarterly statement filed with the Department of Insurance pursuant to Article 10 (commencing with Section 900) of Chapter 1 of Part 2 of Division 1 of the Insurance Code.
CONTRACTOR guarantees that all materials used in the Work and all labor performed shall be in conformity with the Contract Documents including, but not limited to, the standards and specifications set forth in the most current edition of The Greenbook.
CONTRACTOR shall, at its own expense, make any and all repairs and replacements that shall become necessary as the result of any failure of the Work to conform to the aforementioned Contract Documents, and/or standard specifications; provided, however, that CONTRACTOR shall be obligated under this provision only to the extent of those failures or defects of which CONTRACTOR is given notice within a period of twelve (12) months from the date that the Notice of Completion is recorded.
The rights and remedies available to CITY pursuant to this provision shall be 797
Project and Specification No. 25-10
8 cumulative with all rights and remedies available to CITY pursuant to statutory and common law, which rights and remedies are hereby expressly reserved, and neither the foregoing guarantee by CONTRACTOR nor its furnishing of the bonds, nor acceptance thereof by CITY, shall constitute a waiver of any rights or remedies available to CITY against CONTRACTOR.
20. INDEMNIFICATION.
CONTRACTOR agrees to protect, defend, indemnify and hold harmless CITY and State of California Department of Transportation (“STATE”) and their elected and appointed boards, officers, agents, and employees from any and all claims, liabilities, expenses, or damages of any nature, including attorneys’ fees, for injury to or death of any person, and for injury or damage to any property, including consequential damages of any nature resulting therefrom, arising out of or in any way connected with the performance of this Agreement. The defense obligation provided for hereunder shall apply without any advance showing of negligence or wrongdoing by the CONTRACTOR, its employees, and/or authorized subcontractors, but shall be required whenever any claim, action, complaint, or suit asserts as its basis the negligence, errors, omissions or misconduct of the CONTRACTOR, its employees, and/or authorized subcontractors, and/or whenever any claim, action, complaint or suit asserts liability against the CITY and STATE, its elected officials, officers, agents and employees based upon the work performed by the CONTRACTOR, its employees, and/or authorized subcontractors under this Agreement, whether or not the CONTRACTOR, its employees, and/or authorized subcontractors are specifically named or otherwise asserted to be liable. Notwithstanding the foregoing, the CONTRACTOR shall not be liable for the defense or indemnification of the CITY and STATE for claims, actions, complaints or suits arising out of the sole active negligence or willful misconduct of the CITY and STATE. This provision shall supersede and replace all other indemnity provisions contained either in the CITY’s specifications or CONTRACTOR’s proposal, which shall be of no force and effect.
CONTRACTOR shall comply with all of the provisions of the Workers’ Compensation insurance laws and Safety in Employment laws of the State of California, including the applicable provisions of Divisions 4 and 5 of the California Labor Code and all amendments thereto and regulations promulgated pursuant thereto, and all similar State, Federal or local laws applicable; and CONTRACTOR shall indemnify and hold harmless CITY and STATE from and against all claims, liabilities, expenses, damages, suits, actions, proceedings and judgments, of every nature and description, including attorney fees, that may be presented, brought or recovered against CITY and STATE for or on account of any liability under or failure to comply with any of said laws which may be incurred by reason of any Work performed under this Agreement by CONTRACTOR or any subcontractor or others performing on behalf of CONTRACTOR.
CITY and STATE do not, and shall not, waive any rights against CONTRACTOR which it may have by reason of the above hold harmless agreements, because of the acceptance by CITY and STATE or the deposit with CITY and STATE by CONTRACTOR of any or all of the insurance policies described in Paragraph 21 (Insurance) of this 798
Project and Specification No. 25-10
9 Agreement.
The hold harmless agreements by CONTRACTOR shall apply to all liabilities, expenses, claims, and damages of every kind (including but not limited to attorneys’ fees) incurred or alleged to have been incurred, by reason of the operations of CONTRACTOR or any subcontractor or others performing on behalf of CONTRACTOR, whether or not such insurance policies are applicable. CONTRACTOR shall require any and all tiers of subcontractors to afford the same degree of indemnification to the CITY and STATE and their elected and appointed boards, officers, agents, and employees that is required of CONTRACTOR and shall incorporate identical indemnity provisions in all contracts between CONTRACTOR and all tiers of its subcontractors.
In the event that CONTRACTOR and CITY and STATE are sued by a third party for damages caused or allegedly caused by negligent or other wrongful conduct of CONTRACTOR, or by a dangerous condition of CITY’s and STATE’S property created by CONTRACTOR or existing while the property was under the control of CONTRACTOR, CONTRACTOR shall not be relieved of its indemnity obligation to CITY and STATE by any settlement with any such third party unless that settlement includes a full release and dismissal of all claims by the third party against the CITY and STATE.
21. INSURANCE.
(a) Minimum Scope and Limits of Insurance. CONTRACTOR shall not commence work under this Agreement until it has obtained all insurance required under this Paragraph 21 and CITY has approved the insurance as to form, amount, and carrier, nor shall CONTRACTOR allow any subcontractor to commence any Work until all similar insurance required of the subcontractor has been obtained and approved.
CONTRACTOR shall obtain, maintain, and keep in full force and effect during the life of this Agreement all of the following minimum scope of insurance coverages with an insurance company admitted to do business in California, rated “A,” Class X, or better in the most recent Best’s Key Insurance Rating Guide, and approved by CITY:
(i) Commercial general liability, including premises -operations, products/completed operations, broad form property damage, blanket contractual liability, independent contractors, personal injury or bodily injury with a policy limit of not less than One Million Dollars ($1,000,000.00) per occurrence. If such insurance contains a general aggregate limit, it shall apply separately to this Agreement or shall be twice the required occurrence limit.
(ii) Business automobile liability for owned vehicles, hired, and non- owned vehicles, with a policy limit of not less than One Million Dollars ($1,000,000.00) combined single limit per accident for bodily injury and property damage.
799
Project and Specification No. 25-10
10 (iii) Workers’ compensation insurance as required by the State of California, with Statutory Limits, and Employer’s Liability insurance with a limit of no less than One Million Dollars ($1,000,000.00) per accident for bodily injury or disease. CONTRACTOR agrees to waive, and to obtain endorsements from its workers’ compensation insurer waiving subrogation rights under its workers’ compensation insurance policy against the CITY and STATE, its officers, agents, employees, and volunteers arising from work performed by CONTRACTOR for the CITY and STATE and to require each of its subcontractors, if any, to do likewise under their workers’ compensation insurance policies.
(iv) Umbrella or excess liability insurance that will provide bodily injury, personal injury and property damage liability coverage at least as broad as the primary coverages set forth above, including commercial general liability, automobile liability, and employer’s liability. Such policy or policies shall include the following terms and conditions:
(1) A drop down feature requiring the policy to respond in the event that any primary insurance that would otherwise have applied proves to be uncollectable in whole or in part for any reason; (2) Pay on behalf of wording as opposed to reimbursement; (3) Concurrency of effective dates with primary policies; (4) Policies shall “follow form” to underlying primary policies; and (5) Insureds under primary policies shall also be insureds under the umbrella or excess policies.
(b) Endorsements. The commercial general liability insurance policy and business automobile liability policy shall contain or be endorsed to contain the following provisions:
(i) Additional insureds: The City of Costa Mesa and the State of California Department of Transportation, their elected and appointed boards, officers, officials, agents, employees, and volunteers are additional insureds with respect to: liability arising out of activities performed by or on behalf of the CONTRACTOR pursuant to its contract with the City; products and completed operations of the CONTRACTOR; premises owned, occupied or used by the
CONTRACTOR; automobiles owned, leased, hired, or borrowed by the CONTRACTOR.”
(ii) Notice: “Said policy shall not terminate, nor shall it be canceled nor the coverage reduced, until thirty (30) days after written notice is given to CITY.”
800
Project and Specification No. 25-10
11 (iii) Other Insurance: “CONTRACTOR’s insurance coverage shall be primary insurance as respects the City of Costa Mesa, its officers, officials, agents, employees, and volunteers. Any other insurance maintained by the City of Costa Mesa shall be excess and not contributing with the insurance provided by this policy.”
(c) Reporting Provisions . Any failure of CONTRACTOR to comply with the reporting provisions of the policies shall not affect coverage provided to the City of Costa Mesa, its officers, officials, agents, employees, and volunteers.
(d) Insurance Applies Separately. CONTRACTOR’s insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the limits of the insurer’s liability.
(e) Deductible or Self-Insured Retention. If any of such policies provide for a deductible or self -insured retention to provide such coverage, the amount of such deductible or self -insured retention shall be approved in advance by CITY. No policy of insurance issued as to which the CITY is an additional insured shall contain a provision which requires that no insured except the named insured can satisfy any such deductible or self-insured retention.
(f) Proof of Insurance. Prior to commencement of the Work, CONTRACTOR shall furnish CITY, through the Project Manager, proof of compliance with the above insurance requirements in a form satisfactory to City’s Risk Management.
(g) Non-Limiting. Nothing in this Paragraph 21 shall be construed as limiting in any way, the indemnification provision contained in this Agreement, or the extent to which Consultant may be held responsible for payments of damages to persons or property.
22. PREVAILING WAGE REQUIREMENTS.
(a) Prevailing Wage Laws. CONTRACTOR is aware of the requirements of Chapter 1 (beginning at Section 1720 et seq.) of Part 7 of Division 2 of the California Labor Code, as well as Title 8, Section 16000 et seq. of the California Code of Regulations (“Prevailing Wage Laws”), which require the payment of prevailing wage rates and the performance of other requirements on “public works” and “maintenance” projects. This Project is a “public works” project and requires compliance with the Prevailing Wage Laws. CONTRACTOR shall defend, indemnify and hold the CITY, its elected officials, officers, employees and agents free and harmless from any claim or liability arising out of any failure or alleged failure to comply with the Prevailing Wage Laws.
(b) Payment of Prevailing Wages. CONTRACTOR shall pay the prevailing wage rates for all work performed under this Agreement. When any craft or classification is omitted from the general prevailing wage determinations, CONTRACTOR shall pay the wage rate of the craft or classification most closely related to the omitted classification. A copy of the general prevailing wage rate determination is on file in the Office of the City 801
Project and Specification No. 25-10
12 Clerk and is incorporated into this Agreement as if fully set forth herein. CONTRACTOR shall post a copy of such wage rates at all times at the project site(s).
(c) Legal Working Day . In accordance with the provisions of Labor Code Section 1810 et seq., eight (8) hours is the legal working day. CONTRACTOR and any subcontractor(s) of CONTRACTOR shall comply with the provisions of the Labor Code regarding eight (8) -hour work day and 40- hour work week requirements, and overtime, Saturday, Sunday, and holiday work. Work performed by CONTRACTOR’s or any subcontractor’s employees in excess of eight (8) hours per day, and 40 hours during any one week, must include compensation for all hours worked in excess of eight (8) hours per day, or 40 hours during any one week, at not less than one and one- half times the basic rate of pay. CONTRACTOR shall forfeit as a penalty to CITY Twenty -Five Dollars ($25.00), or any greater penalty set forth in the Labor Code, for each worker employed in the execution of the Work by CONTRACTOR or by any subcontractor(s) of CONTRACTOR, for each calendar day during which such worker is required or permitted to the work more than eight (8) hours in one calendar day or more than 40 hours in any one calendar week in violation of the Labor Code.
(d) Apprentices. CONTRACTOR shall comply with the provisions of Labor Code Section 1777.5 concerning the employment of apprentices on public works projects.
CONTRACTOR shall be responsible for ensuring compliance by its subcontractors with Labor Code Section 1777.5.
(e) Payroll Records. Pursuant to Labor Code Section 1776, CONTRACTOR and any subcontractor(s) shall keep accurate payroll records, showing the name, address, social security number, work classification, straight time and overtime hours worked each day and week, and the actual per diem wages paid to each journeyman, apprentice, worker, or other employee employed by CONTRACTOR or any subcontractor in connection with this Agreement. Each payroll record shall contain or be verified by a written declaration that it is made under penalty of perjury, stating both of the following:
(1) The information contained in the payroll record is true and correct; and (2) The employer has complied with the requirements of Sections 1771, 1881, and 1815 of the Labor Code for any work performed by his or her employees on this Project. The payroll records shall be certified and shall be available for inspection at all reasonable hours in accordance with the requirements of Labor Code Section 1776. CONTRACTOR shall also furnish each week to CITY’s Project Administration Division a statement with respect to the wages of each of its employees during the preceding weekly payroll period.
(f) Registration with DIR. CONTRACTOR and any subcontractor(s) of CONTRACTOR shall comply with the provisions of Labor Code Section 1771 and Labor Code Section 1725.5 requiring registration with the DIR.
23. COMPLIANCE WITH ALL LAWS.
CONTRACTOR shall, at its own cost and expense, comply with all applicable local, state, and federal laws, regulations, and requirements in the performance of this 802
Project and Specification No. 25-10
13 Agreement, including but not limited to laws regarding health and safety, labor and employment, and wage and hours.
24. ADDITIONAL CONTRACT PROVISIONS – State. Contractor shall comply with all of the terms and conditions of the documents included in Exhibit “A”, specifically Program Supplement No. 00000A510 to Administering Agency -State Agreement for State Funded Projects No. 12- 5312S21 and Master Agreement Administering Agency - State Agreement State-Funded Projects, attached hereto and incorporated herein by this reference as though set forth in full. Specifically, Contractor shall comply and adhere to the requirements in Exhibit “E”.
25. DRUG-FREE WORKPLACE POLICY.
CONTRACTOR, upon notification of the award of this Agreement, shall establish a Drug-Free Awareness Program to inform employees of the dangers of drug abuse in the workplace, the penalties that may be imposed upon employees for drug abuse violations occurring in the workplace, and the employee assistance programs available to employees. Each employee engaged in the performance of a CITY contract must be notified of this Drug- Free Awareness Program, and must abide by its terms.
CONTRACTOR shall conform to all the requirements of CITY’s Policy No. 100- 5, attached hereto. Failure to establish a program, notify employees, or inform the CITY of a drug-related workplace conviction will constitute a material breach of contract and cause for immediate termination of the contract by the CITY.
26. NON–DISCRIMINATION.
In performing this Agreement, CONTRACTOR will not engage in, nor permit its agents to engage in, discrimination in employment of persons because of their race, religion, color, national origin, ancestry, physical handicap, medical condition, marital status or sex, or sexual orientation, except as permitted pursuant to Section 12940 of the Government Code. Violation of this provision may result in the imposition of penalties referred to in Section 1735 of the California Labor Code.
27. PROVISIONS CUMULATIVE.
The provisions of this Agreement are cumulative and in addition to, and not in limitation of, any other rights or remedies available to CITY.
28. NOTICES.
It shall be the duty and responsibility of CONTRACTOR to notify all tiers of subcontractors and material men of the following special notice provision; namely, all preliminary 20-day notices or stop notices shall be directed only to the City Clerk and to no other department, and shall be either personally delivered or sent by certified mail, postage prepaid.
803
Project and Specification No. 25-10
14 All other notices shall be in writing and delivered in person or sent by certified mail, postage prepaid. Notices required to be given to CITY pursuant to this Agreement shall be addressed as follows:
City of Costa Mesa
77 Fair Drive
Costa Mesa, CA 92626
Attn: Seung Yang
Notices required to be given to CONTRACTOR shall be addressed as follows:
Hardy & Harper
32 Rancho Circle
Lake Forest, CA 92630
Attn: Michael Amundson, Vice President
Notices required to be given to CONTRACTOR’s sureties shall be addressed as follows:
Fidelity and Deposit Company of Maryland
777 South Figueroa Street, Suite 3900
Los Angeles, CA 90017
Attn: Dwight Reilly, Attorney-in-Fact
29. INDEPENDENT CONTRACTOR.
The parties hereto acknowledge and agree that the relationship between CITY and CONTRACTOR is one of principal and independent contractor and no other. All personnel to be utilized by CONTRACTOR in the performance of this Agreement shall be employees of CONTRACTOR and not employees of the CITY. CONTRACTOR shall pay all salaries and wages, employer’s social security taxes, unemployment insurance and similar taxes relating to employees and shall be responsible for all applicable withholding taxes.
Nothing contained in this Agreement shall create or be construed as creating a partnership, joint venture, employment relations, or any other relationship except as set forth between the parties. The parties specifically acknowledge and agree that CONTRACTOR is not a partner with CITY, whether general or limited, and no activities of CITY or CONTRACTOR or statements made by CITY or CONTRACTOR shall be interpreted by any of the parties hereto as establishing any type of business relationship other than an independent contractor relationship.
30. P ERS ELIGIBILITY INDEMNIFICATION.
In the event that CONTRACTOR or any employee, agent, or subcontractor of CONTRACTOR providing services under this Agreement claims or is determined by a court of competent jurisdiction or the California Public Employees’ Retirement System (PERS) to be elig ible for enrollment in PERS as an employee of the CITY, CONTRACTOR shall indemnify, defend, and hold harmless CITY for the payment of any 804
Project and Specification No. 25-10
15 employee and/or employer contributions for PERS benefits on behalf of CONTRACTOR or its employees, agents, or subcontractors, as well as for the payment of any penalties and interest on such contributions, which would otherwise be the responsibility of CITY.
Notwithstanding any other agency, state or federal policy, rule, regulation, law or ordinance to the contrary, CONTRACTOR and any of its employees, agents, and subcontractors providing service under this Agreement shall not qualify for or become entitled to, and hereby agree to waive any claims to, any compensation, benefit, or any incident of employment by CITY, including but not limited to eligibility to enroll in PERS as an employee of CITY and entitlement to any contribution to be paid by CITY for employer contribution and/or employee contributions for PERS benefits.
31. VALIDITY.
The invalidity in whole or in part of any provision of this Agreement shall not void or affect the validity of any of the other provisions of this Agreement.
32. GOVERNING LAW.
This Agreement shall be governed by and construed in accordance with the laws of the State of California. Any legal action relating to or arising out of this Agreement shall be subject to the jurisdiction of the County of Orange, California.
33. NO THIRD PARTY BENEFICIARY RIGHTS.
This Agreement is entered into for the sole benefit of the CITY and CONTRACTOR and no other parties are intended to be direct or incidental beneficiaries of this Agreement and no third party shall have any right in, under or to this Agreement.
34. ASSIGNABILITY.
This Agreement may not be transferred or assigned by either party, or by operation of law, to any other person or persons or business entity, without the other party’s written permission. Any such transfer or assignment, or attempted transfer or assignment , without written permission, may be deemed by the other party to constitute a voluntary termination of this Agreement and this Agreement shall thereafter be deemed terminated and void.
35. WAIVER.
No waiver of any provision of this Agreement shall be effective unless in writing and signed by a duly authorized representative of the party against whom enforcement of a waiver is sought referring expressly to this Paragraph. The waiver of any right or remedy in respect to any occurrence or event shall not be deemed a waiver of any right or remedy in respect to any other occurrence or event, nor shall any waiver constitute a continuing waiver.
805
Project and Specification No. 25-10
16 36. HEADINGS.
Section and subsection headings are not to be considered part of this Agreement, are included solely for convenience, and are not intended to modify or explain or to be a full or accurate description of the content thereof.
3 7. CONSTRUCTION.
The parties have participated jointly in the negotiation and drafting of this Agreement and have had an adequate opportunity to review each and every provision of the Agreement and submit the same to counsel or other consultants for review and comment. In the event an ambiguity or question of intent or interpretation arises with respect to this Agreement, this Agreement shall be construed as if drafted jointly by the parties and in accordance with its fair meaning. There shall be no presumption or burden of proof favoring or disfavoring any party by virtue of the authorship of any of the provisions of this Agreement.
38. COUNTERPARTS.
This Agreement may be executed in one or more counterparts by the parties hereto. All counterparts shall be construed together and shall constitute one Agreement.
39. CORPORATE AUTHORITY.
The persons executing this Agreement on behalf of the parties hereto warrant that they are duly authorized to execute this Agreement on behalf of said parties and that by doing so, the parties hereto are formally bound to the provisions of this Agreement.
[Signature page follows.]
806
Project and Specification No. 25-10
17 IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed by and through their respective authorized officers, as of the date first above written.
CITY OF COSTA MESA
A municipal corporation
__________________________________ Date: _____________________ Cecilia Gallardo-Daly
Interim City Manager
CONTRACTOR
__________________________________ Date: _____________________ Signature
__________________________________
Michael Amundson, Vice President
ATTEST:
__________________________________ Date: _____________________ Brenda Green
City Clerk
APPROVED AS TO FORM:
__________________________________ Date: _____________________ Kimberly Hall Barlow
City Attorney
APPROVED AS TO INSURANCE:
__________________________________ Date: _____________________ Ruth Wang
Risk Management
APPROVED AS TO PURCHASING:
807
Project and Specification No. 25-10
18 __________________________________ Date: _____________________ Carol Molina
Finance Director
DEPARTMENTAL APPROVAL:
__________________________________ Date: _____________________ Raja Sethuraman
Public Works Director
__________________________________ Date: _____________________ Paul Martin
Project Manager
808
EXHIBIT A
CONTRACTOR’S BID
809
810
i
TABLE OF CONTENTS
PAGE NUMBER
TABLE OF CONTENTS ................................... ..................................................................i THRU v
SECTION A
NOTICE INVITING BIDS..............................................................................N-1 THRU N-2
SECTION B
INFORMATION FOR BIDDERS..................................................................................B-1 1 PREPARATIONS OF BID FORM.........
............................................................B-1 2 QUALIFICATION OF BIDDERS......................................................................B-1 3 BID SECURITY...........................................................................................B-1 4 NON-COLLUSION AFFIDAVIT ......................................................................B-1 5 SIGNATURE...............................................................................................B-1 6 CORRECTIONS..........................................................................................B-1 7 DELIVERY OF PROPOSAL...........................................................................B-1 8 BID DEPOSIT RETURN................................................................................B-1 9 TAXES ......................................................................................................B-2 10 WITHDRAWAL OF BIDS...............................................................................B-2 11 AGREEMENT AND BONDS...........................................................................B-2 12 FORFEITURE FOR FAILURE TO POST SECURITY AND EXECUTE
AGREEMENT .............................................................................................B-2 13 BIDDERS INTERESTED IN MORE THAN ONE BID............................................B-2 14 EXAMINATION OF SITE AND CONTRACT DOCUMENTS...................................B-2 15 INTERPRETATION OF PLANS AND DOCUMENTS............................................B-3 16 ADDENDA .................................................................................................B-3 17 QUESTIONS TO THE ENGINEER...................................................................B-3 18 EQUIVALENT MATERIALS............................................................................B-3 811
ii
Table of Contents
(CONTINUED)
PAGE NUMBER
19 EVIDENCE OFRESPONSI BILITY...................................................................B-3 20 LEGAL RESPONSIBILITIES..........................................................................B-3 21 ANTI-DISCRIMINATION ...............................................................................B-4 22 DRUG-FREE WORKPLACE POLICY...............................................................B-4 23 BID PROTEST PROCEDURES......................................................................B-4 24 ASSEMBLY BILL626 ..................................................................................B-4 REQUEST FOR INTERPRETATION OF CONTRACT DOCUMENTS.....................................B-6
SECTION C
PROPOSAL .........................................................................................P-1 THRU P-10
SECTION D
GENERAL PROVISIONS ................................... ......................................................................GP-1 1-2 TERMS AND DEFINITIONS .......................................................................GP-2 1-3 A BBREVIATIONS.....................................................................................GP-3 1-6 BIDDING AND SUBMISSION OF BID............................................................GP-3 1-6.1.1 REQUEST FOR INTERPRETATION ............................................................GP-3 1-6.1.2 SOIL CONDITIONS..................................................................................GP-4 1-6.1.3 RETURN OF BID SECURITY.....................................................................GP-4 1-6.2 SUBCONTRACTING LISTING.....................................................................GP-4 1-7 AWARD AND EXECUTION OF THE CONTRACT............................................GP-5 1-7.1.1 EXECUTION OF THE AGREEMENT............................................................GP-6 1-7.2 CONTRACT BONDS ................................................................................GP-6 2-1 WORK TO BE DONE.................................................................................GP-7 2-2 PERMITS................................................................................................GP-7 812
iii
Table of Contents
(CONTINUED)
PAGE NUMBER
2-5 THE CONTRACTORS EQUIPMENTAND FACILITIES.....................................GP-7 2-5.2 TEMPORARY UTILITY SERVICES...............................................................GP-8 2-5.4 HAUL ROUTES....................................................................................... GP-8 2-7 CHANGES INITIATED BY THE AGENCY...................................................... GP-9 2-8 EXTRA WORK.........................................................................................GP-9 2-9 CHANGED CONDITIONS ......................................................................... GP-9 3-1 ASSIGNMENT .......................................................................................GP-10 3-4 AUTHORITY OF THE BOARD AND THE ENGINEER.....................................GP-10 3-5 INSPECTION ........................................................................................ GP-11 3-6 THE CONTRACTORS REPRESENTATIVE................................................. GP-12 3-7 CONTRACT DOCUMENTS.......................................................................GP-12 3-10 SURVEYING......................................................................................... GP-14 3-10.3 LINE AND GRADE................................................................................. GP-14 3-12 WORK SITE MAINTENANCE................................................................... GP-15 3-12.2 AIR POLLUTION CONTROL.....................................................................GP-15 3-12.6 WATER POLLUTION CONTROL................................................................GP-17 3-12.6.2 BEST MANAGEMENT PRACTICES(BMPS)..............................................GP-18 3-12.6.3 STORM WATER POLLUTION PREVENTION PLAN(SWPPP).......................GP-18 3-12.6.4 DEWATERING.......................................................................................GP-20 3-13.3 WARRANTY ......................................................................................... GP-21 4-4 TESTING ............................................................................................. GP-21 5-1 LAWS AND REGULATIONS..................................................................... GP-22 5-2 SPECIAL NOTICES................................................................................ GP-22 5-3 LABOR ................................................................................................ GP-23 813
iv
Table of Contents
(CONTINUED)
PAGE NUMBER
5-3.3 PAYROLL RECORDS........................... .................................................. GP-23 5-3.5 APPRENTICES ..................................................................................... GP-23 5-4 INSURANCE......................................................................................... GP-24 5-7 SAFETY ...............................................................................................GP-25 5-7.1 WORK SITESAFETY............................................................................. GP-25 5-7.8 STEEL PLATE COVERS........................................................................ GP-25 6-1 CONSTRUCTION SCHEDULE AND COMMENCEMENT OF THE WORK...........GP-25 6-1.1 CONSTRUCTION SCHEDULE.................................................................. GP-25 6-1.3 DAILY REPORT SUBMITTAL....................................................................GP-26 6-3 TIME OF COMPLETION.......................................................................... GP-26 6-5 USE OF IMPROVEMENT DURING CONSTRUCTION................................... GP-26 6-7 TERMINATION OF THE CONTRACT FOR DEFAULT.....................................GP-27 6-7.3 NOTICE OF TERMINATION FOR DEFAULT................................................GP-27 6-7.4 RESPONSIBILITY OF SURETY................................................................ GP-27 6-9 LIQUIDATED DAMAGES......................................................................... GP-27 7-3 PAYMENT............................................................................................ GP-28 7-3.2 PARTIAL AND FINAL PAYMENT............................................................... GP-29 7-3.2.1 PROMPT PROGRESS PAYMENT TO SUBCONTRACTORS.......................... GP-31 7-3.2.2 PROMPT PAY MONITORING AND ENFORCEMENT OF PROGRESS PAYMENTS.......................................................................................... GP-31 7-3.3 DELIVERED MATERIALS........................................................................ GP-32 7-3.4 MOBILIZATION ..................................................................................... GP-32 7-3.4.1 TRAVEL ROUTE AND TRUCKING AN EQUIPMENT..................................... GP-33 814
v
Table of Contents
(CONTINUED)
PAGE NUMBER
7-3.4.2 CONSTRUCTION SEQUENCE/ORDER OF WORK...................................... GP-33 7-4 PAYMENT FOR EXTRA WORK................................................................ GP-34 7-4.2 BASIS FOR ESTABLISHING COSTS......................................................... GP-34 7-4.2.1 LABOR ................................................................................................ GP-34 7-4.3 MARKUPS............................................................................................ GP-34 7-4.3.1 WORK BY THE CONTRACTOR................................................................ GP-34 7-4.3.2 WORK BY A SUBCONTRACTOR.............................................................. GP-35 7-6 SUMMARY OF PUBLIC CONTRACT CODE§ 9204
. GP-35
SECTION E
SPECIAL /TECHNICAL PROVISIONS.................................................... SP-1 THRU SP-149
SECTION F
MISCELLANEOUS CONTRACT DOCUMENTS (SAMPLE)
1 A GREEMENT (SAMPLE)............... .....................................................22 PAGES 2 C OUNCIL POLICY .............................................................................D-1 - D-3 3 INSURANCE (SAMPLE) .......................................................................2PAGES 4 BONDS .............................................................................................2 PAGES 5 APPLICATION FORBUSINESS LICENSE ................................................1 PAGE 6 W-9 FORM .....................................................................................4 PAGES
SECTION G
APPENDICES
APPENDIX A PROJECT LO
CATION ANDMAP ........................................................................2 PAGES APPENDIX B SELF‐HAUL SOLID WASTE REPORTING FORM
AND C&D DEBRISDIVERSION FACILITIES INORANGE COUNTY..............................................2 PAGES APPENDIX C CALTRANS ANDCITY STANDARD DRAWINGS .................................................57 PAGES IRRIGATION STANDARDS ......................................................................................................3 PAGES 815
N-1
CITY OF COSTA MESA
ORANGE COUNTY,
CALIFORNIA
NOTICE INVITING BIDS
NOTICE IS HEREBY GIVEN that the City of Costa Mesa(City) invites sealed bids, to be submitted electronically only, for the following project:
FAIRVIEW ROAD IMPROVEMENT PROJECT (FAIR DRIVE TO NEWPORT BOULEVARD), CITY PROJECT NO. 25-10
STATE FUNDED, PROJECT NO. CRASL-5312(106)
1. BID SUBMISSION AND OPENING: Bids must be submitted electronically via the City of Costa MesasPlanetBids portal before the deadline of4:00 P.M., Monday, May 5, 2025, at which time or shortly thereafter the City will open bids electronically. The bid results will be posted online via PlanetBids. No paper bids or any other form of submittal will be accepted. Any bid received after the scheduled closing time for the receipt of bids will be rejected. The City is not responsible for and accepts no liability in the event a response is late due to any network, internet, or any other technical difficulty or interruption. It shall be the sole responsibility of the bidder to ensure that his/her/its bid is received by the deadline.
To access the bid documents and bid on this project, potential vendors and bidders must first register through the CitysPlanetBids portal at:
https://www.planetbids.com/portal/portal.cfm?Co
mpanyID=45476.
2. SCOPE OF WORK AND BID DOCUMENTS: The scope of work generally consists of street improvements along Fairview Road between Fair Drive and Newport Boulevard. Work includes, but is not limitedto,
removal and replacement of asphalt and concrete parkways (e.g., curb & gutter, sidewalk, driveways, curb ramps, cross gutters, etc.), grind and overlay of the asphalt pavement, installation of a new HAWK signal mid-block along Fairview Road, median landscaping, bus stop relocation and construction, etc. The contractor shall begin work withinTEN (10) DAYS after the contract has been approved by the City of Costa Mesa. The work shall be diligently prosecuted to completion withinNINETY-FIVE (95) WORKING DAYS.
The plans, specifications, and bid documents for this project can be obtained via theCitys PlanetBids portal at:https://www.planetbids.com/portal/portal.cfm?CompanyID=45476.
It is the biddersresponsibility to ensure that the most current version of the solicitation, including any addenda, has been
downloaded. Bids received without the applicable addenda will be rejected as incomplete.
3. PRE-BID MEETING OR JOB WALK: None.
4. BID CONTENTS: All bids must be submitted on the proposal form included in the bid documents. No bid will be considered unless it is made on the proposal form furnished by the City and made in accordance with the provisions of theb
id requirements.
5. BID SECURITY: Each biddermust submit a certified check, cashiers check, or a bid bond, made payable to or in favor of the City of Costa Mesa, in an amount equal to at least ten percent (10%) of the total amounto
f the bid, to the Costa Mesa City Clerk prior to the bid submission deadline. No bid will be considered unless such certified check, cashier's check, or bid bond is received by the City Clerk PRIOR to the bid submission deadline.
6. CONTRACTORS LICENSE: A valid California Contractor's License Class A (General Engineering Contractor) issued by the Calif ornia Contractors State License Board is required at the 816
N-2
time the contract is awarded pursuant to California Public Contract Code section 3300. Each bidder must also be qualified as required by law at the time of the bid opening.
7. REG
ISTRATION WITH THE DEPARTMENT OF INDUSTRIAL RELATIONS: Pursuant to Labor Code sections 1725.5 and 1771.1, no contractor or subcontractor shall be qualified to bid on, be listed in a bidp
roposal, subject to the requirements of Section 4104 of the Public Contract Code, or engage in the performance of any contract for public work unless registered and qualified pursuant to Labor Code section 1725.5.
8. PREVAILING WAGES: In addition, this project is a public work subject to prevailing wage requirements. Pursuant to provisions of Sections 1770 et seq. of the California Labor Code, all works employed on the project
shall be paid not less than the general prevailing rate of per diem wages, as determined by the Director of the Department of Industrial Relations (DIR) for work of a similar character in the locality in which the work is performed, and not less than the general prevailing rate of per diem wages for holiday and overtime work. Copies of the prevailing rate of per diem wages are on file with Costa Mesa Public Services Department and are available to any interested party upon request. The applicable State prevailing wages are also set forth on the Department of Industrial Relations website: http://www.dir.ca.gov; these rates are subject to predetermined increases. The prime contractor shall post a copy of theDIRsdetermination of the prevailing rate of per diem wages at each job site
. This project is subject to compliance monitoring and enforcement by the DIR.
9. PAYMENT (LABOR & MATERIAL) BOND AND PERFORMANCE BOND: A Payment (Labor & Material) Bond and a Performance Bond, each in the amount of 100% of the contract amount, will be required of thesuccessful
bidder prior to or after the award of the contract.
10. RETENTION: The City withholds five percent (5%) of each progress payment as retention. Pursuant to Public Contract Code section 22300, the successful bidder may substitute certain securities for money withheld bythe
City to ensure performance of the contract. At the request and expense of the contractor, securities equivalent to the amount withheld shall be deposited with the public agency, or with a state or federally chartered bank in this state as the escrow agent, who shall then pay those moneys to the contractor. Securities will be returned to the contractor upon satisfactory completion of the contract.
11. NON-DISCRIMINATION: The bidding process and contract are subject to State and Federal non- discrimination requirements, including but not limited to the requirement that no person or business shall discriminate on
the basis of race, color, national origin, ancestry, religious creed, physical disability, mental disability, medical condition, marital status, sex, gender, gender expression, gender identity, sexual orientation, age, or military or veteran status in its solicitation, selection, hiring, or treatment of individuals or businesses in connection with the bidding process or work performed for the City in connection with the project.
12. CITYS RIGHT TO REJECT BIDS: The City of Costa Mesa reserves the right, in its sole discretion, to reject any or all bids, or to waive any minor irregularities or informalities in any bid.
13. ADDITIONAL R
EQUIREMENTS: This project is subject to local, State, and Federal regulations and requirements, as detailed in the bid documents.
For all inquiries, please
contact Anna Baca, Public Works Department, via e-mail at [email protected].
Brenda Green, City Clerk
City of Costa Mesa
Dated: March 27, 2025
817
Project and Specification No. 25-10,
State Funded Project NO. CRASL-5312(106)
B-1
INFORMATION FOR BIDDERS
1. PREPARATION OF BID FORM: The City of Costa Mesa (City) requires that bids be submitted on the proposal available onPlanetBids at such time and place as is stated in the Notice Inviting Bids. All information requested in the bid forms must be provided. All bids shall be submitted electronically via the Citys public bidding platform, PlanetBids only. No other form of submittal shall be accepted.It is the sole responsibility of the Bidder to see that his bid is received in proper time. Any bid received after the scheduled closing time for receipt of bids will berejected. Each Bidder is responsible for acknowledging all addenda.
2. QUALIFICATION OF BIDDERS: Each Bidder shall submit a list of Construction Project References indicating Public Works and/or similar construction projects completed or
in progress within the last 24 months. Forms for this purpose are furnished with the bid package.
3. BID SECURITY / BID BOND: Each bid shall be accompanied by one of the following:
cash, cashier's check made payable to the City, a certified check made payable to the City, or aBidd
er's Bond executed by an admitted surety insurer, made payable to the City, in an amount not less than 10% of the maximum amount of the bid. This original bid security / bid bond must be submitted to the CityClerks Officeat least one hour prior to the bid submission deadline. Any and alllate submittals of the bid security / bid bondshall be rejected, and it is the bidders responsibility, not the delivery service, to ensure said bid security / bid bond is delivered timely to the City Clerks office. The Bidders Bond shall be signed by both, the Bidder and the Surety; and both signatures shall be notarized. The bid security shall be given as a guarantee that the Bidder, if awarded the work, shall execute the contract in conformity with the Contract Documents and shall provide the surety bond or bonds as specified therein within fourteen (14) calendar days after a written Notice of Intent to Award Contract is deposited in the mail. In the case of refusal or failure to enter into said contract, the check or bond, as the case may be, shall be forfeited to the City.
4. NONCOLLUSION AFFIDAVIT: Each bid shall be accompanied by a notarized Noncollusion Affidavit on a form which is included in the Contract Documents.
5. SIGNATURE: Via thePlanetBids pla
tform, the bid must beelectronically or digitally
signed in the name of the Bidder and must be person or persons duly authorized to sign the bid
on behalf of the Bidder.
6. CORRECTIONS: Any corrections made to the submitted bid must be made electronically viaPlanetBids.
7. DELIVERY OF PROPOSAL: Pro
posals shall be submitted electronically via
PlanetBids: https://www.planetbids.com/portal/portal.cfm?Co mpanyID=45476. No other form of submittal shall be accepted by the City.
8. BID DEPOSIT RETURN:De
posits of three of more low bidders, the number being
818
Project and Specification No. 25-10,
State Funded Project NO. CRASL-5312(106)
B-2
at the discretion of the City, will be held for sixty (60) calendar days or until posting by the successfulbidder
of the Bonds and Certificates of Insurance required and return of executed copies of the Agreement, whichever first occurs, at which time the deposits will be returned.
9. TAXES: No mention shall be made in the proposal of Sales Tax, Use Tax or any other tax, as all amounts bid will be deemed and held to include any such taxes which may be
applicable.
10. WITHDRAWAL OF BIDS: Any bidder may withdraw his bid either personally, by written request, or by telegraphic request confirmed in the manner specified above at any time priorto the scheduled closi
ng time for receipt of bids.
11. AGREEMENT AND BONDS: The Agreement form, which the successful bidder, as Contractor, will be required to execute, and the forms and amounts of surety bonds and Certif
icates of Insurance which he will be required to furnish prior to the execution of the Agreement, are included in the Contract Documents and should be carefully examined by the Bidder. The successful Bidder will be required to submitTHREE (3) executed copies of the Agreement, the Performance Bond, the Payment (Labor & Material) Bond and the Certificates of Insurance. Payment and performance bonds shall be issued by a surety who is listed in the latest revision of U.S. Department of Treasury Circular 570 and Code of Civil Procedure Section 995.120. The Performance Bond and the Payment (Labor & Material) Bond shall be signed by both, the Bidder and the Surety; and both signatures shall be notarized.
12. FORFEITURE FOR FAILURE TO POST SECURITY AND EXECUTE AGREEMENT:
In the event the Bidder to whom the Notice of Intent to Award Contract is given fails or refuses to post the
required bonds and Certificates of Insurance and return executed copies of the Agreement within fourteen (14) calendar days after notification, the City may declare the Bidder's bid deposit or bond forfeited as damages caused by the failure of the bidder to post such security and execute such copies of the Agreement, and may give Notice of Intent to Award Contract to the next lowest responsive and responsible bidder, or may call for new bids.
13. BIDDERS INTERESTED IN MORE THAN ONE BID: No person, firm or corporation shall be allowed to make, or file or be interested in more than one bid for the same work unless alternate bids are
specifically called for.
14. EXAMINATION OF SITE AND CONTRACT DOCUMENTS: Each bidder shall visit the site of the proposed work and fully acquaint himself with the conditions relating to the constructionand
labor so that he may fully understand the facilities, difficulties, and restrictions attending the execution of the work under the contract. Bidders shall thoroughly examine and be familiar with the drawings and specifications. The failure or omission of any bidder to receive or examine any contract document, form, instrument, addendum, or other document or to visit the site and acquaint himself with conditions there existing shall in no way relieve any bidder from any obligation with respect to his bid or to the contract. The submission of a bid shall be taken as prima facie evidence of compliance with this section.
819
Project and Specification No. 25-10,
State Funded Project NO. CRASL-5312(106)
B-3
15. INTERPRETATION OF PLANS AND DOCUMENTS: If any Bidder contemplating submitting a bid for the proposed contract is in doubt as to the true meaning of any part of the drawin
gs, specifications, or other Contract Documents, or finds discrepancies in, or omissions from the drawings and specifications, it may submit to the Engineer a written request for an interpretation or correction thereof. The Bidder submitting the Request for Interpretation (RFI) shall be responsible for its prompt delivery and on the form included within this IFB (Page B-6) Any interpretation or correction of the Contract Documents will be made only by addendum duly issued and a copy of such addendum will be mailed or delivered to each person receiving a set of the Contract Documents. No person is authorized to make any oral interpretation of any provision in the Contract Documents to any Bidder, and no Bidder is authorized to rely on any such unauthorized oral interpretation.
16. ADDENDA: The effect of all addenda to the Contract Documents shall be considered in the bid package and said addenda shall be made part of the Contract Documents and shall be returned
with the bid package. Failure to submit any such addenda with the bid package may render the bid irregular and result in its rejection by the City.
17. QUESTIONS TO THE ENGINEER: Questions regarding the bid documents (i.e.
Plans, Specifications, Contract Documents, Bid Forms, etc.) will be received by the Engineer up tofive
(5) working days prior to the bid opening as specified in the Notice Inviting Bids. Questions asked of the Engineer after this time will not be addressed.
18. EQUIVALENT MATERIALS: Requests for the use of equivalents to those specified, must be submitted to the City. Only substitutions approved prior to bid due date via addenda Product S u
bstitutions, will be considered. No substitutions will be considered after bid due date and contract award. It is the sole responsibility of the successful bidder to prove to the City that such a material is truly an equivalent.
19. EVIDENCE OF RESPONSIBILITY: Upon the request of the City, a bidder whose bid is under consideration for the award of the contract shall submit promptly to the City satisfactory evidence showing
the Bidder's financial resources, its construction
experience, and its organization and plant facilities available for the performance of the contract.
20. LEGAL RESPONSIBILITIES: All proposals must be submitted, filed, made and executed in accordance with State and Federal laws relating to bids for contracts of this nature whether the
same or expressly referred to herein or not. Any Bidder submitting a proposal shall by such action thereby agree to each and all of the terms, conditions, provisions and requirements set forth, contemplated and referred to in the Plans, Specifications and other Contract Documents, and to full compliance therewith. Additionally, any Bidder submitting a proposal shall, by such action thereby, agree to pay at least the minimum prevailing per diem wages as provided in Section 1773, et. seq. of the Labor Code for each craft, classification or type of workman required as set forth by the Director of Industrial Relations of the State of California.
820
Project and Specification No. 25-10,
State Funded Project NO. CRASL-5312(106)
B-4
21. ANTI-DISCRIMINATION: It is the policy of the City that in connection with all work performed under contracts, there be no discrimination against any prospective or active employee engaged
in the work because of race, color, ancestry, national
origin, religious creed, sex, age, or marital status. The Contractor agrees to comply with applicable Federal and California laws including, but not limited to, the California Fair Employment Practice Act, beginning with Government Code Section 12900, and Labor Code Section 1735. In addition, the Contractor agrees to require like compliance by any subcontractors employed on the work by him/her.
22. DRUG-FREE WORKPLACE POLICY: Contractor, upon notification of contract award, shall establish a Drug-Free Awareness Program to inform employees of the dangers of drug
abuse in the workplace, the penalties that may be imposed upon employees for drug abuse violations occurring in the workplace, and the employee assistance programs available to employees. Each employee engaged in the performance of a City contract must be notified of this Drug-Free Awareness Program, and must abide by its terms. Contractor shall conform to all the requirements of City's Policy No. 100-5. Failure to establish a program, notify employees, or inform the City of a drug-related workplace conviction will constitute a material breach of contract and cause for immediate termination of the contract by the City.
23. BID PROTEST PROCEDURES: Any bid protest must be submitted in writing before 5:00 PM of the 5th business dayfollo wing bid openings. The initial protest document shall contain
a complete statement of the basis for the protest. The protest shall refer to the specific portion of the document which forms the basis for the protest. The protest shall include the name, address and telephone number of the person representing the protesting party. The party filing the protest shall concurrently transmit a copy of the initial protest document and any attached documentation to all other parties with a direct financial interest which may be adversely affected by the outcome of the protest. Such parties shall include all other Bidders or proposers who appear to have a reasonable prospect of receiving an award depending upon the outcome of the protest. Upon receipt of a bid protest, the matter shall be reviewed by the Public Services Director, whose decision shall be final. This procedure supersedes the procedure of appeal outlined in City of Costa Mesa Municipal Code Section 2-303.
24. ASSEMBLY BILL 626: Assembly Bill 626 (AB 626), adds section 9204 to the Public Contract Code creating a claims resolution process applicable to any claim (as defined) by acontractor
against a public entity filed in connection with a public works project. Section 9204 applies to public works contracts entered into on and after January 1, 2017. The legislation was supposed to sunset (end) on January 1, 2020, unless extended by subsequent legislation. The summary of Section 9204 is specified as follows:
In the event of any dispute or controversy with the City over any matter whatsoever, 821
Project and Specification No. 25-10,
State Funded Project NO. CRASL-5312(106)
B-5
the Contractor shall not cause any delay or cessation in or of Work, but shall proceed with the perfo
rmance of the Work in dispute. The Contractor shall retain any and all rights provided that pertain to the resolution of disputes and protests between the parties. The Disputed Work will be categorized as anunresolved dispute and payment, if any, shall be as later determined by agreement or a court of law. The Contractor shall keep accurate, detailed records of all Disputed Work, claims and other disputed matters.
All claims arising out of or related to the Contract Documents or this Project, and the consideration and payment of such claims, are subject to the Government Claims Act (Government Code Section 810 et seq.) with regard to filing claims. All such claims are also subject to the dispute procedures set forth in Public Contract Code Section 9204 and Public Contract Code Section 20104, et seq. (Article 1.5), to the extent each is applicable. This Contract hereby incorporates those provisions as through fully set forth herein. Thus, the Contractor or any Subcontractor must file a claim in accordance with the Government Claims Act as a prerequisite to filing a construction claim in compliance with Section 9204 and Section 20104 et seq. (if applicable), and must then adhere to Section 20104, et seq. and Section 9204, as applicable, pursuant to the definition ofclaim as individually defined therein. 822
Project and Specification No. 25-10,
State Funded Project NO. CRASL-5312(106)
P-1 BID PROPOSAL
SECTION C
PROPOSAL
FOR THE
FAIRVIEW ROAD
IMPROVEMENT PROJECT (FAIR DRIVE TO NEWPORT BLVD.),
CITY PROJECT NO. 25-10
STATE FUNDED PROJECT NO. CRASL-5312(106)
The Honorable City Council
City of Costa Mesa
77 Fair Drive
Costa Mesa, CA 92626
Dear Council Members:
In co
mpliance with the NOTICE INVITING BIDS FOR THE FAIRVIEW ROAD
IMPROVEMENT PROJECT (FAIR DRIVE TO NEWPORT BOULEVARD), STATE FUNDED PROJECT NO. CRASL 5312 (106), CITY PROJECT NO. 25-10, a copy which is hereto attached, the undersigned has carefully examined the location of the proposed Work, the Plans, Specifications and other Contract Documents and is therefore satisfied as to the conditions to be encountered, as to the character, quality and quantity of work to be performed and materials to be furnished and as to the requirements of the specifications and the Contract. It is mutually agreed that the submission of a proposal shall be considered prima facie evidence that the BIDDER has made such examination.
If awarded the Contract, the undersigned agrees to commence the Work under the Contract WITHIN TEN (10) DAYS AFTER DATE OF CONTRACT, AND COMPLETE SAID WORK WITHIN NINETY - FIVE (95) WORKING DAYS from the first day of commencement of such work unless legal extension is granted in accordance with the terms set forth in the specifications, and to perform and complete the Work as shown on the Plans and in accordance with the Specifications and other Contract Documents, and to furnish all labor, materials, tools and equipment necessary to complete the Work in-place therefor, in the manner and time herein prescribed at the following prices, to wit:
______________
Bidder's Initials
823
Project and Specification No. 25-10,
State Funded Project NO. CRASL-5312(106)
P-1a BID PROPOSAL
______________
Bidder's Initi
als
BID SCHEDULE PROPOSAL
ITEM
# BID ITEM DECRIPTION APPROX.
QTY. UNIT
UNIT
PRICE
(in figures)
ITEMS
TOTAL
(in figures)
1 Mobilization (5% Maximum) 1 L.S. $ $
2* Additional Work Items 1 F.A. $150,000 $150,000
3 Preparation And Implementation Of Erosion
Control And
Best Management
Practice 1 L.S. $ $
4 Unclassified Excavation (Fill) 400 C.Y. $ $
5 Variable Cold Mill 2-inches 325,000 S.F. $ $
6 Asphalt Concrete (AC) Pavement 400 TON $ $
7 Asphalt Rubber Hot Mix (ARHM-G) Surface Course4,100 TON $ $ 8 Construct Crushed Miscellaneous Base (CMB) 800 TON $ $ 9 Construct Variable Height Portland Cement
Concrete (PCC) Curb 0-inches to 8-inches over 6-
inch Crushed Miscellaneous Base (CMB)
100 L.F. $ $
10 Construct 8-inch Portland Cement Concrete (PCC)
Curb & Gutter over 6-inch Crushed Miscellaneous
Base (CMB)
100 L.F. $ $
11 Construct 4-inch Portland Cement Concrete (PCC)
Sidewalk over 4-inch Crushed Miscellaneous Base
(CMB)
1,400 S.F. $ $
12 Construct 4-inch Portland Cement Concrete (PCC)
Curb Ramp over 4-inch Crushed Miscellaneous
Base (CMB) includingFederalYellow Truncated
Domes
4,800 S.F. $ $
13 Construct 6-inch Drive Approach over 6-inch
Crushed Miscellaneous Base (CMB) 600 S.F. $ $
14 Adjust and Reset Existing Survey Monuments and
Ties per California Licensed Land Surveyor 10 EA $ $
15 Traffic Signing, Striping, Pavement Legends &
RPMs 1 L.S. $ $
16 Furnish and Install Pull Boxes 10 EA $ $
17 Temporary Traffic Control - Pedestrian Control,
Construction Phasing/Staging, Public Convenience
& Safety
1 L.S. $ $
18 Median Clearing and Grubbing 1 L.S. $ $
19** Median Landscaping 1 L.S. $ $
19A Landscape Maintenance (90 days) 1 L.S. $ $
20** Median Irrigation 1 L.S. $ $
824
Project and Specification No. 25-10,
State Funded Project NO. CRASL-5312(106)
P-1b BID PROPOSAL
___________________________________________________________________ ______________________________
_____________________________________
______________
Bidder's Initials
BID SCHEDULE PROPOSAL (Continued)
ITEM # BID ITEM DECRIPTION EST.
QTY. UNIT
UNIT
PRICE
(in figures)
ITEMS
TOTAL
(in figures)
21 Construct 9-inch Portland Cement Concrete
(PCC) Bus Pad over 12-inch Crushed
Miscellaneous Base (CMB)
2,000 S.F. $ $
22 Construct Portland Cement Concrete (PCC)
Bus Boarding Islands and Portland Cement
Concrete (PCC) Median Cut-Through
3,000 S.F. $ $
23 Construct 8-inch Portland Cement Concrete
(PCC) Spandrel over 8-inch Crushed
Miscellaneous Base (CMB)
600 S.F. $ $
24 Furnish and Install Traffic Loops 5 EA $ $
25** Furnish and Install Pedestrian Hybrid Beacon
(HAWK Signal) as Shown on Plans. 1 L.S. $ $
26** Perform Traffic Signal Modification (at Fairview
Rd. & Wilson St.) 1 L.S. $ $
27 Furnish and Install White Flexible K-71 Posts200 EA $ $ 28 Furnish and Install Green Preformed
Thermoplastic Markings 11,500 S.F. $ $
29A Adjust Orange County Sanitation District
(OCSD) PVC Lined Manhole Covers to Grade9 EA $ $
29B Adjust Orange County Sanitation District
(OCSD) Unlined Manhole Covers to Grade 16 EA $ $
30 Adjust Costa Mesa Sanitation District (CMSD)
Manhole Covers to Grade 6 EA $ $
31 Adjust Storm Drain Manhole Frame & Cover to
Grade 12 EA $ $
32 Adjust Utility and Water Valves to Grade 26 EA $ $
TOTAL BID PROPOSAL FIGURES: $
TOTAL BID PROPOSAL (Words):
825
Project and Specification No. 25-10,
State Funded Project NO. CRASL-5312(106)
P-1c BID PROPOSAL
PROPOSAL BID SCHEDULE
(CONTINUED)
NOTES:
1. The accuracyo
f estimate quantities as shown is not guaranteed; the Bidder shall make his/her own estimate from the drawings and field review for verification. If the unit price and the total amount are different, the unit price will control the bid.
Payment shall be based on actual work done and/or actual quantities used.
2. The City reserves the right to delete one or more bid items and/or to increase or decrease biditems quantities, at no additional cost to the City.
3. (*) Allowance is for unforeseen work not included in the contract documents and to be included in the total bid amount as identified as follows. Use of the allowance will be at the sole discretion of the City and must be authorized in writing at the discretion of the City. This Bid item will cover unforeseen work that is not included in the contract documents. Any money used from the project allowance will be authorized via an Allowance Disbursement Form at theCitys sole discretion. Any amount of money remaining in the Allowance line item upon completion of the Project will be deducted from the Contract by Deductive Change Order for the full amount(s) remaining therein. The Contractor has no beneficial interest in, and/or claim to, the Allowances and hereby disclaims any and all such interests.
4. (**) Schedule of Values shall be submitted before 4:00 PM of the 5th business day following the bid opening. Price includes the indirect cost and markup.
5. FA designates force account. Payment shall be made on a time and materials basis, only if directed by the Engineer.
6. (F) Designates Final Pay Item. When an item of work is designated asFINAL PAY ITEM in the Specifications, the estimated quantity for that item of work shall be the final pay quantity, unless the dimensions of any portion of that item are revised by the Engineer, or the item or any portion of the item is eliminated. If the dimensions of any portion of the item are revised, and the revisions result in an increase or decrease in the estimated quantity of that item of work, the final pay quantity for the item will be revised in the amount represented by the changes in the dimensions. If a final pay item is eliminated, the estimated quantity for the item will be eliminated. If a portion of a final pay item is eliminated, the final pay quantity will be revised in the amount represented by the eliminated portion of the item of work.
The estimated quantity for each item of work designated asFINAL PAYITEM in the Specifications, shall be considered as approximate only, and no guarantee is made that the quantity which can be determined by computations, based on the details and dimensions shown on the plans, will equal the estimated quantity. No allowance will be made in the event that the quantity based on computations does not equal the estimated quantity.In case of discrepancy between the quantity shown in the Engineers Estimate for a final pay item and the quantity or summation of quantities for the same item shown on the plans, payment will be based on the quantity shown in the Engineers Estimate.
7. Bidder declares that it has read and understands Items 14 & 15 of Information for Bidders (Page B-2 and B-3).
_______________
Bidder's Initials
826
Project and Specification No. 25-10,
State Funded Project NO. CRASL-5312(106)
IG(03/25)
(GENPROVS)
GP-1
GENERAL PROVISIONS
PART 1
SECTION 1 GENERAL
1-2 GENERAL
[Add the
following:].
Except as hereinafter
provided, the provisions of the latest edition of the Standard Specifications for Public Works Construction (Green Book), and all amendments thereto, adopted by the Joint Cooperative Committee of Southern California Chapter, American Public Works Association, Southern California District and Associated Contractors of California; hereinafter referred to as Standard Specifications, are adopted as the "Standard Specifications of the City of Costa Mesa" and shall be considered as a part of these specifications. Copies of the Standard Specifications are available from the publisher:
BNi Building News
1612 S. Clementine Street
Anaheim, California 92802
(714) 517-0971
Where specified in these specifications, the latest edition of the California Building Code, based on the latest edition of the International Building Code, the latest edition of the "Standard Specifications and Standard Plans of the State of California, Department of Transportation, Division of Highways," "Standard Plans of the Orange County Environmental Management Agency," and "Los Angeles County Flood Control District, Design Manual, Standard Drawings" shall apply or unless otherwise noted in these specifications or at the direction of the ENGINEER.
Where referenced in these Specifications, the latest edition of theCity of Costa Mesa Standard Drawings and theWork Area Traffic Control Handbook(WATCH) published by Building News, Inc., shall also apply.
All of the Contract Documents are intended to be complementary. Work required by one of the Contract Documents and not by others shall be done as if required by all. This Contract shall supersede any prior agreement of the parties.
The section numbers of these General Provisions coincide with those of the said Standard Specifications. Only those sections requiring amendment, elaboration, or specifying options, are called out.
827
Project and Specification No. 25-10,
State Funded Project NO. CRASL-5312(106)
IG(03/25)
(GENPROVS)
GP-2
The following modifications are made to the "Standard Specifications." If there is a conflict between the "Standard
Specifications" and these modifications, these modifications shall have first precedence.
1-2 TERMS AND DEFINITIONS
[Add or redefine the following:].
(a) AGENCY The City of Costa Mesa, California, hereinafter referred to as "CITY."
(b) BOARD The City Council of the City of Costa Mesa,
California, hereinafter referred to as "BOARD."
(c) CONTRACT
DOCUMENTS
Documents including but not limited to the following:
The proposal form P-1 through P-9b, Notice Inviting
Bids, Standard Specifications, General Provisions,
Special Provisions, Plans, Bonds, Insurance
Certificates, Agreement, and all Addenda setting
forth any modifications of the documents as further
specified in contract agreement.
(d) ENGINEER The administrating officer of the City of Costa Mesa or his authorized representative hereinafter referred
to as ENGINEER.
(e) BIDDER
(f) COMMUNITY
WORKFORCED
AGREEMENT (if applicable)
Any individual, firm, partnership, corporation, or
combination thereof, submitting a bid proposal for
the work contemplated in the contract documents,
acting directly or through a duly authorized
representative, hereinafter referred to as BIDDER.
The agreement between the City of Costa Mesa, the
Los Angeles/Orange Counties Building and
Construction Trades Council, and the signatory
Craft Councils and Local Unions entered into on
February 1, 2022, that governs onsite labor on the
project.
(f) LEGAL ADDRESS OF
CONTRACTOR
The legal address of the Contractor shall be the
address given on the Contractor's bid and is hereby
designated as the place to which all notices, letters
or other communications to the Contractor shall be
mailed or delivered.
828
Project and Specification No. 25-10,
State Funded Project NO. CRASL-5312(106)
IG(03/25)
(GENPROVS)
GP-3
(g) LABORATORY An established laboratory approved and authorized by the ENGINEER for testing materials and work
involved in the contract.
1-3 ABBREVIATIONS
CALTRANS
CWA
State of California, Department of Transportation,
Division of Highways
The Community Workforce Agreement (if
applicable)
O.C.E.M.A. Orange County Environmental Management
Agency
L.A.C.F.C.D. Los Angeles County Flood Control District
1-6 BIDDING AND SUBMISSION OF THE BID
1-6.1 General
[Add thefoll
owing:].
Proposal shall be made and submitted on proposal forms P-1 through P-9a in accordance with the Notice Inviting Bids. In addition to the required signatures in the spaces provided in the proposal forms, each BIDDER shall initial each sheet of the proposal forms at the bottom right hand corner.
No person, firm, partnership, corporation, or combination thereof shall be allowed to make or file or be interested in more than one bid for the same work, unless alternate bids are called for. A person, firm, partnership, corporation, or combination thereof who has submitted a sub-proposal to a BIDDER or who has quoted prices on materials to a BIDDER is not thereby disqualified from submitting a sub-proposal to or quoting prices to the other bidders. If, on the opening of bids, more than one bid appears in which the same person, firm, partnership, corporation or combination thereof is interested as a principal, 829
Project and Specification No. 25-10,
State Funded Project NO. CRASL-5312(106)
IG(03/25)
(GENPROVS)
GP-4
all such bids shall be rejected.
Proposals with interlineations,
alterations, or erasures shall be initialed by the BIDDER'S authorized agent. Alternative proposals, special conditions, or other limitations or provisions affecting the bid, except as such called for in the contract documents, will render the bid informal and may cause its rejection.
All proposals must give the prices bid for the various items of work and must be signed by the BIDDER, who shall give his address. Each bid shall have thereon the affidavit of the BIDDER that such bid is genuine and not sham nor collusive, nor made in the interest nor behalf of any other person not therein named and that the BIDDER has not directly nor indirectly induced or solicited any other BIDDER to put in a sham bid, nor induced nor solicited any person, firm, partnership, corporation, or combination thereof to refrain from bidding, and that the BIDDER has not in any manner sought by collusion to secure himself an advantage over any other BIDDER.
A contractor or subcontractor shall not be qualified to bid on, be listed in a bid proposal, subject to the requirements of Section 4104 of the Public Contract Code, or engage in the performance of any contract for public work, as defined in this chapter, unless currently registered and qualified to perform public work pursuant to Section 1725.5 of the Labor Code. It is not a violation of this section for an unregistered contractor to submit a bid that is authorized by Section 7029.1 of the Business and Professions Code or by Section 10164 or 20103.5 of the Public Contract Code, provided the contractor is registered to perform public work pursuant to Section 1725.5 at the time the contract is awarded. 1-6.1.1 Request for Interpretation
If any person contemplating submitting a bid is in doubt as to the meaning of any part of the Plans, Specification, or other proposed Contract Documents, or finds discrepancies in, or omissions from the drawings or specifications, (It, he, she) may make a request to the ENGINEER, in writing, for an interpretation or correction thereof pursuant to the provisions in the Information for Bidders section of these specifications. The person submitting such a request shall be responsible for its prompt delivery. All such interpretations of the Contract Documents will be made only by addenda duly issued, and a copy of each such addendum will be mailed or delivered to each person receiving a set of Contract Documents at (its, his, her) last address of record. The CITY will not be responsible for any other explanations or interpretations of the Contract Documents. 1-6.1.2 Soil Conditions
The BIDDER shall inspect the soil conditions before submitting a bid. By submitting a bid, the BIDDER acknowledges that he is satisfied with the quality of the work area including but not restricted to the conditions affecting, handling and storage of materials, disposal of excess materials, and the soil conditions.
830
Project and Specification No. 25-10,
State Funded Project NO. CRASL-5312(106)
IG(03/25)
(GENPROVS)
GP-5
1-6.1.3 Return of Bid Security
Any BIDDER may withdraw
its bid, either personally, or by telegraphic or written request, at any time prior to the scheduled closing time for the receipt of bids. It is the sole responsibility of the BIDDER to see that any such telegraphic or written request is delivered to the City Clerk prior to said closing time. Bid security of such BIDDERS will be returned promptly to the BIDDER.
The bid security of the BIDDER whose bid is accepted will be held by the CITY until the contract has been executed and the accompanying insurance certificates, performance bond and labor and materials bond are approved and filed, whereupon the bid security will then be returned to the BIDDER.
The bid security of the second and third lowest BIDDERS will be retained until the contract is awarded to and executed by the BIDDER whose bid is accepted, or until 45 days after the opening of bids, whichever period is shorter. The bid security of all BIDDERS other than the three lowest will be returned promptly after the opening of bids.
If a BIDDER fails or refuses promptly to execute the agreement to do the work or fails or refuses to comply with insurance and bonding requirements, the bid security shall be forfeited to the CITY and shall be collected and paid into the General Fund of the CITY. 1-6.2 Subcontractor Listing
[Add the following:].
The ENGINEER, as duly authorized officer, may consent to subcontractor substitution requested by the Contractor subject to the limitations and notices prescribed in Section 4107 of the Public Contract Code.
The Prime Contractor agrees to pay each Subcontractor under this prime contract for satisfactory performance of its contract no later than 7 days from the receipt of each payment the Prime Contractor receives from AGENCY.
The Prime Contractor agrees further to release retainer payments to each Subcontractor within 30 days after thesubcontractors work is satisfactorily completed. 1-7 AWARD AND EXECUTION OF THE CONTRACT
1-7.1 General
[Add the following:].
The award of contract, if awarded, will be to the lowest responsive and responsible bidder whose proposal complies with all requirements of the Notice Inviting Bids and Section 1- 831
Project and Specification No. 25-10,
State Funded Project NO. CRASL-5312(106)
IG(03/25)
(GENPROVS)
GP-6
6 of these specifications. The BIDDER, upon notification as the "apparent low bidder," shall comply with
the CITY'S insurance and bonding requirements by submitting the required insurance certificates and bonds (tree sets) withinfourteen (14) days after the mailing of a Notice of Intent to Award to the BIDDER that the contract is ready for execution. The contract will be awarded within thirty (30) days of receipt of properly approved insurance certificates and bonds pursuant to CITY requirements spelled out in these specifications. BIDDER must
take particular note of "insurance requirements"
contained in these specifications and sample agreement included within the contract documents, and shoul
d provide that information to his insurance broker in order that a properly executed certificate is submitted. The CITY, however, reserves the right to reject any or all bids and to waive any informality in the bids received. 1-7.1.1 Execution of Agreement
The Agreement shall be signed by the successful BIDDER and returned to the CITY no later than fourteen (14) days from Notice of Intent to Award of the Contract by the CITY.
Failure to comply with insurance and bonding requirements as specified in the Agreement and in Section1-7.1
of these General Provisions shall be considered grounds for the revocation and rejection of the bid and forfeiture of bid security. No proposal shall be considered binding upon the CITY until the execution of the agreement by the CITY. In case of conflict, the agreement shall have precedence over all other written specifications. 1-7.2 Contract Bonds
[Add the following:].
The "Faithful Performance Bond" and the "Labor and Material Bond" as specified in this section shall be for one hundred percent (100%) of the Contract price. The Labor and Material Bond shall be maintained by the Contractor in full force and effect for at least seven (7) months following the filing of the Notice of Completion. The Faithful Performance Bond shall also be kept by the Contractor in full force and effect for at least one (1) year following the filing of the Notice of Completion.
CONTRACTOR shall provide, if requested by the City the following:
A certified copy of the certificate of authority of the surety issued by the Insurance Commissioner.
A certificate from the clerk of the county in which the court or officer is located that the certificate of authority of the surety has not been surrendered, revoked, canceled, annulled, or suspended or, in the event that it has, that renewed authority has been granted.
832
Project and Specification No. 25-10,
State Funded Project NO. CRASL-5312(106)
IG(03/25)
(GENPROVS)
GP-7
Copies of the suretys most recent annual statement and quarterly statement filed with the Department of
Insurance pursuant to Article 10 (commencing with Section 900) of Chapter 1 of Part 2 of Division 1 of the Insurance Code.
SECTION 2 SCOPE OF THE WORK
2-1 WORK TO BE DONE
[Replace in its entirety with the following:].
The scope of work generally consists of street improvements alongFairview Road between Fair Drive and Newport Boulevard. Work includes, but is not limited to, removal and replacement of asphalt and concrete parkways (e.g., curb & gutter, sidewalk, driveways, curb ramps, cross gutters, etc.), grind and overlay of the asphalt pavement, installation of a new HAWK signal mid-block along Fairview Road, median landscaping, bus stop relocation and construction, etc.; and all other work as required as shown on the Plans and specified within these Contract Documents. The CONTRACTOR shall furnish all labor, materials, tools, equipment and incidentals necessary to perform and complete the Work as shown on the Plans and these Contract Documents, and to the satisfaction of the ENGINEER.
2-2 PERMITS
[Add the following:].
All permits and licenses shall be obtained in sufficient time to prevent delays to the work.
In the event that the CITY has obtained permits, licenses or other authorizations applicable to the work, the Contractor shall comply with the provisions of said permits, licenses and other authorizations.
The Contractor shall secure or maintain in force during the period covered by any Agreement resulting from this solicitation all licenses and permits required by law for the operation of their business.
2-5 THE CONTRACTORS EQUIPMENT AND FACILITIES
2-5.1 General
[Add the following:].
The Contractor shall only use the proper construction equipment to protect the City streets from breaking up and deterioration. Haul trucks shall be limited to a gross vehicle weight of 10 tons or less.
833
Project and Specification No. 25-10,
State Funded Project NO. CRASL-5312(106)
IG(03/25)
(GENPROVS)
GP-8
2-5.1.1 RIGHT-OF-WAY
[Add the following to this subsection:].
When the contractor arranges for temporary use of private property for additional work areas and facilities required for theContractorsconvenience, to meet requirements, or other reason(s), the Contractor shall provide the City with written agreement authorizing use of said property.
2-5.2 Temporary Utility Services
[Add the following:].
The Contractor shall provide for his employees an adequate supply of clean, potable drinking water, which shall be dispensed through approved sanitary facilities.
If water is needed during construction, Contractor shall contact Mesa Consolidated Water District or the Irvine Ranch Water District to obtain necessary permits, instructions, and meters prior to commencing work. The Contractor is required to make any and all necessary installations and connections. All water shall be metered. The Contractor shall pay for all deposits and fees involved.
2-5.4 Haul Routes
[Add the following:].
In order to protect the City streets from deterioration due to hauling of materials, the Contractor shall submit to the ENGINEER (at the pre-construction meeting) for approval, a proposed route for the hauling of materials for disposal. Upon approval, the Contractor shall strictly adhere to that route only, unless written permission from the ENGINEER is obtained to change the route.
Waste Hauler Requirements
The California Green Building Standards Code, 2016 Edition, California Code of Regulations, Title 24, Part 11, impacting waste diversion as documented in the City of Costa Mesas Municipal Code Chapter 4 of Title 8, requires that all construction and demolition related projects divert 65% of project waste generated from the landfill.
Consequently, permitted building projects relating to construction and demolition, newly constructed buildings, additions, alterations, interior and exterior demolitions, etc., are required to divert a minimum of 65% of nonhazardous construction and demolition waste from the landfill by recycling, reuse, or salvage. Generally, these materials include brick, drywall, other masonry, cardboard, green waste, paper, carpet, lumber, plastic, concrete, and/or metals. Asphalt, concrete, excavated soil and land-clearing debris should be 100% diverted from disposal. The County provides a suggested list of locations that are meeting and/or exceeding the 65% diversion requirement and may be used for recycling construction and demolition material.
834
Project and Specification No. 25-10,
State Funded Project NO. CRASL-5312(106)
IG(03/25)
(GENPROVS)
GP-9
The City of Costa Mesa requires that all hauling activity in Costa Mesa comply with one of the waste hauling options for your
construction and demolition related project:
• Use Franchise Waste Hauler
• Self-Haul Permit - https://www.costamesaca.gov/city-hall/city-departments/public- services/waste-collection-and-recycling
A
Construction and Demolition Reporting Form as provided in the Miscellaneous Document Section of these Specifications must be completed and submitted by the Contractor to the CITY prior to the release of retention monies. 2-7 CHANGES INITATED BY THE AGENCY
2-7.1 GENERAL
[Add the following:].
ENGINEER shall be the duly authorized officer of the CITY who may grant the changes prescribed in this section.
2-8 EXTRA WORK
[Add the following:].
The extra work as defined in this section of the Standard Specifications and any work done by the Contractor beyond the lines and grades shown on the plans shall only be performed when ordered in writing by the ENGINEER. In absence of such written order, any such work by the Contractor shall be considered unauthorized and will not be paid.
Work so done may be ordered to be removed at the Contractor's expense. 2-9 CHANGED CONDITIONS
[Add the following:].
The Contractor shall promptly act to supply all information to the ENGINEER for proper evaluation. Failure to do so shall constitute a waiver of any payment for delays suffered by the Contractor.
SECTION 3 CONTROL OF THE WORK
3-1 ASSIGNMENT
[Replace the 1st sentence with the following:].
No contract or portion thereof may be assignedwithout
written consent of the BOARD.
3-4 AUTHORITY OF THE BOARD AND THE ENGINEER
835
Project and Specification No. 25-10,
State Funded Project NO. CRASL-5312(106)
IG(03/25)
(GENPROVS)
GP-10
[Add the following:].
When any of the various
units or operations of the work have been suspended, the Contractor shall give at least 24 hours advance notice of the time when he or his subcontractor will start or resume any of such units or operations. That notice is to be given during working hours, exclusive of Saturdays, Sundays or holidays, for the purpose of permitting the ENGINEER to make necessary assignments to his representative on the work.
Any work performed in conflict with said notice, without the presence or approval of the ENGINEER, or work covered up without notice, approval or consent may be rejected or ordered to be uncovered for examination at Contractor's expense and shall be removed at Contractor's expense, if so ordered by the ENGINEER or his representative on the work. Any unauthorized or defective work, defective material or workmanship or any unfaithful or imperfect work that may be discovered before the final payment and final acceptance of work shall be corrected immediately by the Contractor without extra charge even though it may have been overlooked in previous inspections and estimates or may have been caused due to failure to inspect the work.
All authorized alterations affecting the requirements and information given on the approved plans shall be in writing. No changes shall be made on any plan or drawing by the Contractor after the same has been approved by the ENGINEER, except by direction of the ENGINEER in writing. Deviations from the approved plans, as may be required by critical conditions of construction, must be authorized in writing by the ENGINEER.
All instructions, rulings and decisions of the ENGINEER shall be in writing and are binding on all parties unless a formal protest is made as provided in the following paragraph:
If the Contractor considers any work demanded of him to be outside the requirements of the contract, or if he considers any instruction, ruling or decision of the ENGINEER or ENGINEER'S representative to be unfair, the Contractor shall, within ten (10) days after any such demand is made, or instruction, ruling or decision is given, file a written protest with the ENGINEER, stating clearly and in detail his objections and reasons therefor.
Except for such protests and objections as are made of record, in the manner and within the time above stated, the Contractor shall be deemed to have waived and does hereby waive all claims for extra work, damages and extensions of time on account of demands, instructions, rulings and decisions of the ENGINEER.
Upon receipt of any such protest from the Contractor, the ENGINEER shall review the demand, instruction, ruling or decision objected to and shall promptly advise the Contractor, in writing, of his final decision, which shall be binding on all parties, unless within the ten (10) days thereafter the Contractor shall file with the BOARD a formal protest against said decision of the ENGINEER. The BOARD shall consider and render a final decision on any such protest within thirty (30) days of receipt of same. If the BOARD fails to consider and render a final decision on any such protest within thirty (30) 836
Project and Specification No. 25-10,
State Funded Project NO. CRASL-5312(106)
IG(03/25)
(GENPROVS)
GP-11
days of receipt of the same, the protest shall be deemed denied. 3-5 INSPECTION
[Add the following:].
If the Con
tractor requests and receives approval from the ENGINEER to receive inspection services from the CITY outside of a normal eight (8) hour day/forty (40) hour work week or on Saturday, Sunday, or CITY holidays, the Contractor shall arrange with the CITY and ENGINEER for the special inspection services and Contractor shall pay for such special inspection services at a fee established by the ENGINEER to defray the cost for such service.
All work, which has been inspected and deemed defective in its construction or does not meet all of the requirements of the plans and/or specifications by the ENGINEER shall be remedied, or removed and replaced by the Contractor in an acceptable manner, and no compensation will be allowed for such correction.
Any work done beyond the limits of the lines and grades shown on the plans or established by the ENGINEER or extra work done without written authority will be considered as unauthorized and not be paid.
Upon failure on the part of the Contractor to comply with any order of the ENGINEER made under the provisions of this article, the ENGINEER shall have authority to cause defective work to be remedied, or removed and replaced, and unauthorized work to be removed, and to deduct the costs and thereof from any monies due or to come due the Contractor.
Payment will not be made for materials wasted or disposed of in a manner not called for under the Contract. This includes rejected material not unloaded from vehicles, material rejected after is has been placed and material placed outside the limits of the project. No compensation will be allowed for disposing of rejected or excess material. 3-6 THE CONTRACTOR'S REPRESENTATIVE
[Add the following:].
Contractor shall file with the ENGINEER the addresses and telephone numbers where its designated representative may be reached during hours when the work is not in progress.
Instructions and information given by the ENGINEER to the Contractor's authorized representative or at the address or telephone numbers filed in accordance with this section shall be considered as having been given to the Contractor. 837
Project and Specification No. 25-10,
State Funded Project NO. CRASL-5312(106)
IG(03/25)
(GENPROVS)
GP-12
The Contractor shall have on the work site at all times a competent English-speaking superintendent, as his
agent, capable of reading and thoroughly understanding the plans and specifications and other related documents.
3-7 CONTRACT DOCUMENTS
3-7.1 General
[Add the following:].
Contractor will obtain from the ENGINEER, free of charge, copies of plans, general provisions, special provisions and additions to the Standard Specifications that are reasonably necessary for the execution of work.
Contractor shall, at its own expense, obtain copies of the Standard Specifications and Standard Plans and Specifications of CALTRANS, for his general use.
If after the Contract is awarded it appears that the work to be done, or any matter relative thereto, is not sufficiently detailed or explained in the specifications and plans, the Contractor shall apply to the ENGINEER for such further explanations as may be necessary and shall conform to such explanation or interpretation as part of the Contract.
All scaled dimensions are approximate. Before proceeding with the work, the Contractor shall carefully check and verify all dimensions and quantities and shall immediately inform the ENGINEER or his representative of any discrepancies.
The Contractor shall maintain a control set of plans and specifications at all times throughout the construction period. As approved by the Engineer, all final locations determined in the field and any deviations from the plans and specifications shall be marked in red on this control set to show the As-Built conditions. Updates to the control set shall be submitted to the Engineer prior to each monthly progress payment. Upon completion of all work, the Contractor shall submit the control set As-Built Plans.
Additionally, the Contractor shall provide the following:
Street Improvements: Any deviations from the contract plans such as: alignments, and appurtenance locations shall be noted (drawing sketch) on the control plan and a copy submitted to the Engineer no later than (5) working days from the occurrence.
Storm Drain Improvements: Any deviations from the contract plans such as: alignments, elevations, modifications to pipe/structures sizing/material.
Sewer Improvements: Any deviations from the contract plans such as: alignments, elevations, modifications to pipe/structures sizing/material. Contractor shall also provide 838
Project and Specification No. 25-10,
State Funded Project NO. CRASL-5312(106)
IG(03/25)
(GENPROVS)
GP-13
CCTV inspection recordings/videos in format required by Engineer.
Water Improvements: Any devi
ations from the contract plans such as: alignments and
appurtenance locations shall be noted (drawing sketch) on the control plan and a copy submitted to the Engineer no later than (5) working days from the occurrence.
Traffic Improvements: Any deviations from the contract plans such as: location of poles, pull boxes and runs, depth of conduits, number of conductors, and other appurtenant work, for future reference.
Within (15) days of completion of all work, the Contractor shall submit the control set of as-built plans to the Engineer.Final payment will not be made until this requirement is met.
3-7.2 Precedence of the Contract Documents.
If there is a conflict between any of the Contract Documents, the document highest in the order of precedence shall control. The order of precedence, from highest to lowest, shall be as follows:
a) Permit issued by jurisdictional regulatory agencies. b) Change Orders and Supplemental Agreements; whichever occurs last. c) Contract/Agreement.
d) Addenda.
e) Bid/Proposal.
f) Technical Provisions.
g) Special Provisions.
h) Plans.
i) Standard Plans.
j) Standard Specifications.
k) Reference Specifications.
Detail drawings shall take precedence over general drawings. The precedence of the notice inviting bids and instruction to bidders shall be as specified in the Special Provisions.
3-10 SURVEYING
[Replace with the following:].
3-10.1 General
The following supersedes the provisions of this subsection:
The Contractor shall be responsible for directly obtaining the services of a California 839
Project and Specification No. 25-10,
State Funded Project NO. CRASL-5312(106)
IG(03/25)
(GENPROVS)
GP-14
Licensed Land Surveyor to be in responsible charge of all survey work performed under this contract.
The Contractor shall be responsible for the scheduling of all survey requests.
TheContractorsSurveyor shall provide construction staking for project improvements.
Any 25 FT of curb & gutter, driveway, bus pad, and cross gutter to be removed shall be staked and provide cut sheets to engineer prior to the removal to verify the flow line. A copy of the cut sheets shall be provided to the AGENCY for verification. Also a copy of all updated control set by the Contractors Surveyor; showing coordinates, elevation, and description shall be submitted, for quality management (as-built checks by Agency).
The AGENCY will provide construction plans and specifications for the project.
Construction stakes shall be set per the provided plans and specifications. The Contractors Surveyor shall notify the AGENCY immediately of any discrepancy or design errors discovered on the plans during staking or when verifying join points.
The Contractors Surveyor shall research existing County and City records for centerline survey monuments within the project area. Prior to construction, all monuments shall be tied-out and a Corner Record shall be recorded with the County Surveyor per Section 8771 of the Business and Professions Code of the State of California. After completion of construction, any monument disturbed or lost during construction shall be reset, in conformance with Section 8771. Each centerline intersection shall be drawn on a single Corner Record. A copy of all Corner Records shall be submitted to the AGENCY prior to a Notice of Completion being filed.
3-10.3 Line and Grade
Unless otherwise provided in the Special Provisions, lines and grades for construction shall be the responsibility of the Contractor, with the following provisions:
All work under this Contract shall be built in accordance with the lines and grades shown on the plans. Field survey for establishing the lines and grades and for the control of construction shall be the responsibility of the Contractor. All such surveys, including construction staking, shall be under the supervision of a California-licensed land surveyor or by a California-licensed civil engineer allowed by law. Staking shall be performed on all items ordinarily requiring grade and alignment, at intervals normally accepted by the agencies and the trade involved.
The Contractor shall provide a copy of the office calculations and grade sheets to the City Inspector. The Contractor shall be responsible for any error in the finished work and shall notify the ENGINEER within one (1) working day of any discrepancies or design errors discovered during staking.
Unless a separate bid item is provided, the payment for surveying, construction staking, 840
Project and Specification No. 25-10,
State Funded Project NO. CRASL-5312(106)
IG(03/25)
(GENPROVS)
GP-15
professional services, office calculations, furnishing all labor, materials, equipment, tools and incidentals, and for
doing all work involved shall be considered as included in the various items of work, and no additional compensation will be allowed. 3-12 WORK SITE MAINTENANCE
3-12.1 General
[Replace 2nd paragraph with the following:].
Unless the constru
ction dictates otherwise, and unless otherwise approved by the ENGINEER, Contractor shall furnish and operate a self-loading motor sweeper with a functional water spray nozzle system at least
once each working day to keep paved areas in the Work zone and along all haul routes acceptably clean whenever construction, including restoration, is incomplete. [Add the following to this subsection:].
The contractor shall keep the work site clean and free from rubbish and debris at the end of every working day. In addition, the Contractor shall be fully responsible for removing any graffiti placed on new improvements orContractors equipment daily immediately at the start of the work day.
3-12.2 Air Pollution Control
[Add the following:].
Failure of the Contractor to comply with the ENGINEER'S dust control orders may result in an order to suspend work until the condition is corrected and, after giving notice to the Contractor, the ENGINEER may order the condition corrected by others. All costs thus incurred shall be deducted from the amount to be paid to Contractor. No additional compensation will be allowed as a result of such suspension.
No separate payment will be made for any work performed nor material used to control dust resulting from Contractor's performance of the work or from public traffic, either inside or outside the right-of-way. Full compensation for such dust control will be considered to be included in the prices paid for the various items of Work involved.
The contractor shall ensure that any cold-milled street is paved within 48 hours of milling.
The contractor is solely responsible for implementing all necessary dust mitigation measures. Any claims arising from dust-related issues shall be the sole responsibility of the contractor, who shall defend, indemnify, and hold the City harmless from any such claims, liabilities, or damages.
841
Project and Specification No. 25-10,
State Funded Project NO. CRASL-5312(106)
IG(03/25)
(GENPROVS)
GP-16
3-12.3 Noise Control
The Contractor shall
comply with all local sound control and noise level rules, regulations and ordinances which apply to any work performed pursuant to the contract. Each internal combustion engine, used for any purpose on the job or related to the job, shall be equipped with a muffler of a type recommended by the Manufacturer. The noise level from the Contractor's operations shall not exceed 85 dba at a distance of 50 feet. This requirement in no way relieves the Contractor from responsibility for complying with local ordinances regulating noise level.
The said noise level requirements shall apply to all equipment on the job or related to the job, including but not limited to trucks, transit mixers, or transient equipment that may or may not be owned the Contractor. The use of loud signals shall be avoided in favor of light warnings, except those required by safety laws for the protection of personnel. 3-12.4.1 General
[Add the following:].
All surplus materials shall be removed from the site of the Work within five (5) days after completion of the Work causing the surplus materials.
3-12.4.2 Storage in Public Streets
[Add the following to this subsection:].
Storage of equipment and materials on City residential streets or in the public right of way during non-working hours shall not be permitted, and may only be placed in the public right of way for purposes of use that day.
Overnight stockpiling of construction debris or excavated materials is not allowed.
Contractor must obtain written approval from the Engineer prior to storage of construction materials and equipment on the street where improvements are planned, but at minimum, adequate flashing barricades shall be provided.
No area is available within the contract limits for the exclusive use of the Contractor.
However, temporary storage of equipment and materials on City of Santa Ana property may be arranged with the Engineer, subject to the prior demands of the City of Costa Mesa. Use of theContractors work areas and other City of Costa Mesa-owned property shall be at theContractors own risk, and the City of Costa Mesa shall not be held liable for damage to or loss of materials or equipment located within such areas.
The Contractor shall remove equipment, materials, and rubbish from the work areas and other City of Costa Mesa owned property that the Contractor occupies at the conclusion of each working day.
842
Project and Specification No. 25-10,
State Funded Project NO. CRASL-5312(106)
IG(03/25)
(GENPROVS)
GP-17
3-12.6 Water Pollution Control
3-12.6.1 General
[Add the following:].
Discharge of
storm water from construction sites that disturb land equal to or greater than one (1) acre must be in compliance with the state General Construction Activity Permit (Construction Permit). The latest permit provisions of the Construction Permit shall apply.
The Contractor is required to contact the Santa Ana Regional Water Quality Control Board (Regional Board) for all information contained in the Construction Permit. In the event project construction occurs during the transition of revised Construction Permits, the Contractor shall incorporate the necessary modifications specified by the revised Construction Permit within the time period specified in the new Construction Permit.
Project Soil Disturbance is:less than 1 acre (No General Construction Permit required) Construction activity subject to the Construction Permit includes clearing, grading, disturbance to theground
such as stockpiling, work area, or excavation that results in soil disturbances of at least one acre of total land area. Construction activity that results in soil disturbances of less than one acre is subject to the Construction Permit if the construction activity is a part of a larger common plan of development that encompasses one or more acres of soil disturbance or if it is determined that discharges from the project pose a significant threat to water quality.
The CONTRACTOR shall have an account with the State for SMARTS (Storm Water Multiple Application and Report Tracking System). The CONTRACTOR shall contact the CITY with their user ID so that the CITY will grant the CONTRACTOR access as a Data Submitter.
The CONTRACTOR shall complete the NOI within SMARTS
https://smarts.waterboards.ca.gov/smarts/faces/SwSmartsLogin.xhtml. The CONTRACTOR will notify the CITY when the NOI is ready for the CITY to submit to the State. The CONTRACTOR shall
pay all fees associated with the NOI process. The
CONTRACTOR shall also complete all required reports within SMARTS as required by the General Permit and theProjects Storm Water Pollution Prevention Plan (SWPPP).
The CONTRACTOR shall complete the Annual Report and NOT within SMARTS. Once the CITY has been notified, the CITY will review and submit to the State for processing.
A copy of the latest permit is available at:
https://www.waterboards.ca.gov/water issues/programs/stormwater/constp ermits.html
843
Project and Specification No. 25-10,
State Funded Project NO. CRASL-5312(106)
IG(03/25)
(GENPROVS)
GP-18
The CONTRACTOR is hereby directed to read the Construction Permit thoroughly and comply with the requirement
s as specified therein.
3-12.6.2 Best Management Practices (BMPs)
[Add the following:].
The Contractor shall install and maintain the appropriate Best Management Practices (BMPs) to protect water quality within the project limits through the duration of the Project.
The Contractor shall be responsible for any damage to any portion of the Work occasioned by failure to provide proper drainage control prior to the completion and acceptance of the Work.
Payment for furnishing, installing and maintaining BMPs inclusive of sweeping the Project site as required or directed by the ENGINEER shall be included in the other various bid items associated with the work and no additional payment will be allowed thereof. 3-12.6.3 Storm Water Pollution Prevention Plan (SWPPP)
[Add the following:].
If a General Construction Permit is required pursuant to Section 3-12.6.1 of these General Provisions, the following Storm Water Pollution Prevention Plan (SWPPP) requirements shall be adhered to:
The Contractor is responsible for the preparation and implementation of a SWPPP as required by the Construction Permit. The Contractor is responsible for completing all parts of the SWPPP including, REAPs, monitoring, sampling, rain gauge records, weather reports, submitting pictures of every third storm, non-authorized discharge reports, Ad- Hoc reports, Annual Reports, post construction BMPs and other requirements of the SWPPP.
The completed SWPPP must be signed by a QSD (Qualified SWPPP Developer). The completed SWPPP must be submitted to the resident engineer for City review and acceptance, prior to uploading to SMARTS. The Contractor will be responsible for uploading an electronic format of the SWPPP into SMARTS. The SWPPP must be signed by the City before construction begins. A copy of the SWPPP must be available at the site at all times and must be implemented and revised in accordance with the Construction Permit throughout the duration of the project.
Contractor must have QSP (Qualified SWPPP Practitioner). Contractor shall perform site inspections before and after the storm event, and once each 24-hour period during extended storm event, to identify BMP effectiveness and implement repairs or BMP modifications as soon as possible. Sampling of potential pollutant discharges shall be 844
Project and Specification No. 25-10,
State Funded Project NO. CRASL-5312(106)
IG(03/25)
(GENPROVS)
GP-19
conducted by trained personnel and required laboratory test conducted by laboratory accredited b
y the California Department of Health Services Environmental Laboratory Accreditation Program.
Contractor shall be responsible for any penalties assessed against the City if the penalty assessed is due to Contractors violation of the Construction Permit requirement, or Contractors failure to fully implement and monitor SWPPP as required.
Erosion and Sediment Control Plans
Erosion and Sediment Control Plans shall be prepared by the Contractor as part of the SWPPP that identify adequate controls to prevent erosion and discharge of sediment off- site. Payment for the Erosion and Sediment Control Plans shall be included as part of the SWPPP.
When SWPPP is required, after award of the contract and prior to Contractor commencing work, the Contractor shall submit an Erosion and Sediment Control Plan, hereinafter referred to as ESCP, for review by the Engineer. The ESCP shall include erosion and sediment control BMPs for all activities occurring on the construction site and at any temporary storage yards that hold equipment and/or materials. The ESCP, at a minimum, shall be prepared per the applicable guidelines outlined in the California Storm Water Quality Association (CASQA) Best Management Practices Handbook. The Contractor shall make any necessary revisions to the ESCP as directed by the Engineer and the contractor shall not commence work until the ESCP has been approved by the Engineer.
The ESCP must be prepared by a licensed Civil Engineer; however the AGENCY may waive the requirement of licensed Civil Engineer if the Contractor can satisfactorily prove to the Engineer that the person preparing the ESCP is qualified in the field of erosion and sediment control.
The Contractor shall keep a copy of the ESCP at the construction site at all times, for the duration of the contract, and the Contractor shall implement all BMPs as shown in the ESCP, unless granted approval by the Engineer. Failure to implement BMPs properly may result in enforcement actions taken against the Contractor, by the AGENCY. The ESCP shall remain in effect until project completion and final stabilization of the construction site.
Extra erosion and sediment control BMPs shall be available on-site in order to replace failed BMPs or to be implemented during storm events. The Contractor shall mitigate ALL non- stormwater discharges from the construction site, unless granted approval by the AGENCY. The area adjacent to the construction site shall remain free of sediment and shall be swept regularly to be kept clean.
3-12.6.4 Dewatering
[Add the following:].
845
Project and Specification No. 25-10,
State Funded Project NO. CRASL-5312(106)
IG(03/25)
(GENPROVS)
GP-20
Unless otherwise directed in these Special Provisions, the Contractor shall provide and maintain ample means
and devices with which to promptly remove and properly dispose of water entering the excavations or other parts of the work at all times during construction. Dewatering shall be accomplished by methods which will ensure a dry excavation and preservation of the final lines and grades of the bottoms of excavations.
The methods may include sump pumps, deep wells, well points, suitable rock or gravel placed below the required bedding for draining and pumping purposes, temporary pipelines, and other means.
Standby pumping equipment shall be on the job site. A minimum of one standby unit shall be available for immediate installation should any well unit fail. The design and installation of well points or deep wells shall be suitable for the accomplishment of the work. Drawings or details indicating the proposed dewatering system shall be submitted to the CITY for review.
The Contractor shall dispose of the water from the work in a suitable manner without damage to adjacent property.
Conveyance of the water shall be such as to not interfere with traffic flow or treatment facilities operations. No water shall be drained into work built or under construction without prior consent of the ENGINEER.
Water shall be disposed of in such a manner as not to be a menace to the public health and such disposal shall be performed in accordance with Environmental Protection Agency and State Water Quality Control Board standards (NPDES permit). Any testing and reports required under NPDES permit shall be performed by the Contractor and submitted to the appropriate agency for approval at no additional cost to the CITY. 3-13.3 WARRANTY
[Replace 2nd sentence of 1st paragraph with the following:].
The warranty period
shall start on the date the Work is accepted by the Board. [Add the following:].
The Contractor hereby guarantees that the entire work constructed by him under the Contract will meet fully all requirements as to quality of workmanship and materials. The Contractor hereby agrees to make, at his own expense, any repairs or replacements made necessary by defects in materials or workmanship that became evident within one (1) year after the date of the completion, and to restore to full compliance with the requirements of these Contract Documents, including any test requirements set forth herein for any part of the work constructed hereunder, which during said one (1) year period is found to be deficient with respect to any provisions of the Contract Documents. 846
Project and Specification No. 25-10,
State Funded Project NO. CRASL-5312(106)
IG(03/25)
(GENPROVS)
GP-21
The Contractor shall make all repairs and replacements promptly upon receipt of written orders for the same from
the Citys Representative. If the Contractor fails to make the repairs and replacements promptly, the City may do the work and the Contractor and his sureties shall be liable to the City for the cost thereof.
The guarantees and agreements set forth herein shall be secured by a Labor and Material Bond and acceptance of the work by the City. Said bond shall be in the form approved by the City Attorney and executed by a surety company or companies satisfactory to the City in the amount of one hundred percent (100%) of the Contract. Said bond shall remain in force for a period of seven (7) months after the date of Notice of Completion and acceptance. The Contractor shall provide the Faithful Performance Bond furnished under the Contract to remain in force and effect for said amount until the expiration of said one (1) year period.
SECTION 4 CONTROL OF MATERIALS
4-1 GENERAL
Should the Contractor fail to correct deficiencies or public nuisances that have been created because of his/her operation, then these will be considered to be of an emergency nature, and will call for the AGENCY to move in on the project to take corrective action.
Such work will be done on a force account basis with an additional callout charge. There is a minimum two-hour charge for labor on any callout plus an additional callout charge of $300.
4-4 TESTING
[Add the following:].
All tests of materials furnished by the Contractor shall be made in accordance with commonly recognized standards of national organizations and such special methods and tests as are prescribed in these specifications. No materials shall be used until they have been approved by the ENGINEER.
The Contractor shall at his expense furnish the CITY, in triplicate, certified copies of all required factory and mill test reports. Any materials shipped by the Contractor from a factory or mill prior to having satisfactorily passed such testing and inspection by a representative of the CITY shall not be incorporated in the work, unless the ENGINEER shall have notified the Contractor, in writing, that such testing and inspection will not be required.
At the option of the ENGINEER, the source of supply of each of the materials shall be approved by the ENGINEER before delivery is started and before such material is used in the work.
847
Project and Specification No. 25-10,
State Funded Project NO. CRASL-5312(106)
IG(03/25)
(GENPROVS)
GP-22
Unless otherwise provided in the Special Provisions, the CITY will complete and pay for the initial soils,
compaction, and material tests. Any subsequent soil, compaction, and material tests deemed necessary due to the failure of initial tests will be at the Contractor's expense and deducted from the payment due.
SECTION 5 LEGAL RELATIONS AND RESPOSIBILITIES
5-1 LAWS AND REGULATIONS
[Add the following:].
The Contractor shall protect and indemnify the CITY, the BOARD, the ENGINEER, and all of its or their officers, agents and servants against any claim or liability arising from or based on the violation of any existing or future State, Federal and local laws, ordinances, regulations, orders or decrees, whether by himself or his employees. If any discrepancy or inconsistency is discovered in the plans, drawings, specifications or contract for the work in relation to any such law, ordinance, regulation, order or decree, the Contractor shall forthwith report the same to the ENGINEER in writing. 5-2 SPECIAL NOTICES
[Add the following:].
Per Section 1771.4(a)(2) of the California Labor Code, Contractors are required to post job site notices, as prescribed by regulation.
In addition to the special notices requirement to be served by Personnel Delivery or Certified Mail, special notices may also be served by the utilization of FedEx or UPS express service with a confirmed delivery receipt. Service shell be effective on the date of the receipt of the delivery confirm issued by FedEx or UPS. 5-3 LABOR
5-3.2 Prevailing Wages
[Add the following to this subsection:].
Certified Payroll Records shall be submitted to the Engineer every two weeks beginning with the actual start day of construction, and shall be consecutively numbered until the completion of the work. Progress payments will be withheld pending receipt of any outstanding reports.
The Contractor shall assure that a qualified supervisor is present at all times when work is being performed.
5-3.3 Payroll Records
848
Project and Specification No. 25-10,
State Funded Project NO. CRASL-5312(106)
IG(03/25)
(GENPROVS)
GP-23
[Add the following:].
In order to verify
compliance with the Labor Code, Contractor shall furnish to the ENGINEER, weekly, for the duration of the contract period, copies of his payroll statements showing wages paid to each employee during the preceding week and the employee work classification. Use of Form DH-C-347, Payroll Statement of Compliance, is an acceptable method of fulfilling the above requirement.
Any stop orders issued by the Department of Industrial Relations against Contractor or any subcontractor that affectContractors performance of work, including any delay, shall be Contractors sole responsibility. Any delay arising out of or resulting from such stop orders shall be considered Contractor caused delay subject to any applicable liquidated damages and shall not be compensable by the City. Contractor shall defend, indemnify and hold the City, its officials, officers, employees and agents free and harmless from any claim or liability arising out of stop orders issued by the Department of Industrial Relations against Contractor or any subcontractor.
5-3.5 Apprentices
[Replace with the following:].
Attention is directed to the provisions of Sections 1777.5 and 1777.6 of the Labor Code concerning the employment of apprentices by the Contractor or any subcontractor under it. The Contractor and any subcontractor under it shall comply with the requirements of those Sections in the employment of apprentices.
Information relative to apprenticeship standards, wage schedules and other requirements may be obtained from the Director of Industrial Relations, Ex-officio the Administrator of Apprenticeship, San Francisco, California, or from the Division of Apprenticeship Standards and its branch offices.
5-4 INSURANCE
[Replace with the following:].
The minimum amounts and types of insurance coverages are as stated in the Agreement (sample copy attached). Prior to bid submittal the BIDDER shall keep fully informed of the latest insurance requirements of the City of Costa Mesa and shall comply with all other provisions of Section 5-4 of the Standard Specifications.
Below are approved endorsements which satisfy the basic insurance requirements contained in contracts entered into by City of Costa Mesa. These have been approved by the City Attorney's office. The terms of any specific contract with the City are controlling.
Prior to the commencement of any work, the CITY requires that the ENGINEER receive Certificates of Insurance in DUPLICATE for liability coverage of at least $1,000,000 combined single limit, per occurrence and in the aggregate. 849
Project and Specification No. 25-10,
State Funded Project NO. CRASL-5312(106)
IG(03/25)
(GENPROVS)
GP-24
Each insurance policy required by the CITY of the Contractor shall contain the following endorsements:
1. Additional Insureds
"The City of Costa Mesa and its elected and appointed boards, officers, agents, and emp
loyees are additional insureds with respect to the subject project and agreement."
2. Notice
"Said policy shall not terminate, nor shall it be canceled nor the coverage reduced, untilthirty
(30) days after written notice is given to City."
3. Other Insurance
"Any other insurance maintained by the City of Costa Mesa shall be excess and not contri
buting with the insurance provided by this policy."
If any of such policies provide for a deductible or self-insured retention to provide such coverage, the amount of such deductible or self-insured retention shall be approved in advance by City. No policy of insurance issued as to which the City is an additional insured shall contain a provision which requires that no insured except the named insured can satisfy any such deductible or self-insured retention. 5-7 SAFETY
5-7.1 Work Site Safety
5-7.1.1 General
[Add the following:].
Material or other obstructions shall not be placed within fifteen feet (15') of fire hydrants.
Fire hydrants shall be made readily accessible to the Fire Department at all times. 5-7.8 Steel Plate Cover
5-7.8.1 General
[Add the following:].
When backfilling operation of an excavation in the travel way, whether transverse or longitudinal cannot be properly completed within a work day, steel plate bridging with a non-skid surface and shoring may be required to preserve unobstructed traffic flow. 850
Project and Specification No. 25-10,
State Funded Project NO. CRASL-5312(106)
IG(03/25)
(GENPROVS)
GP-25
All steel plate covers utilized for the project must be slide resistant. A non-slip coating will be required on the si
de of the steel plate that that will be utilized for the driving or walking surface.
SECTION 6 PROSECUTION AND PROGRESS OF THE WORK
6-1 CONSTRUCTION SCHEDULE AND COMMENCEMENT OF THE WORK
6-1.1 Construction Schedule
[Replace the 1st Paragraph with the following:].
The Contractor's proposed Constructio
n Work Schedule shall be submitted to the
ENGINEER for approval within ten (10) working days after the date of the BOARDs execution of the Contract Agreement. The Construction Work Schedule shall be supported by written statements from each supplier of materials or equipment indicating that all orders have been placed and acknowledged, and setting forth the dates that each item will be delivered. The Construction Work Schedule shall provide sufficient detail to delineate the main milestones start and end dates for each activity with chronological relationships of all the activities of Work showing the number of working days required to complete the entire project within the Contract Days. The schedule shall also incorporate the requirements of Section 402-5 of the Standard Specifications to complete the Work within the Contract Days. Prior to issuing the Notice to Proceed, the ENGINEER will schedule a preconstruction meeting with the Contractor to review the proposed Construction Work Schedule, delivery dates, activity milestone dates, arrange utility coordination, discuss construction methods and staging, and clarify inspection procedures.
The Contractor shall submit progress reports to the ENGINEER by the tenth day of each month. The report shall include an updated Construction Work Schedule. All revisions shall be completed within three days after review by the ENGINEER. The Contractor shall submit requests for changes in the schedule to the CITY for approval at least three (3) working days prior to performing any work. Any deviations from the original approved Construction Work Schedule shall be explained and identified in the updated Construction Work Schedule. Progress payments will be withheld pending receipt of any outstanding reports.
The Contractor shall furnish the ENGINEER with a 3-week look ahead schedule in a tabular format at every weekly construction meeting. The 3-week look ahead schedule shall utilize the main milestones within the approved Baseline Construction Schedule with updates and include sub-activities. [Add the following:].
6-1.3 DAILY REPORT SUBMITTAL
851
Project and Specification No. 25-10,
State Funded Project NO. CRASL-5312(106)
IG(03/25)
(GENPROVS)
GP-26
Contractor shall submit daily reports to the CITY at the end of each working day. All forms shall be provided
by the CITY. Any cost for this item shall be included in the various items of work and no other compensation will be allowed.
6-3 TIME OF COMPLETION
6-3.1 General
[Replace the 1st Sentence with the following:].
The Contractor shall begin the
Work within ten (10) Working Days after the date the
Contract is executed by CITY unless a later start date is agreed upon by the CITY and Contractor within a written Notice-to-Pro
ceed. The Work shall be completed within
ninety-five (95) Working Days from the date set in the Notice-to-Proceed or the first day of commencement of Work, whichever occurs first.
6-5 USE OF IMPROVEMENT DURING CONSTRUCTION
[Add the following:].
Should it become necessary, due to developed conditions, to occupy any portion of the Work before Contract is fully completed, such occupancy shall not constitute acceptance by the CITY of work by Contractor.
6-5.1 WORK DAYS, WORKING HOURS AND HOLIDAYS
[Add the following to this subsection:]
The workday shall have a regular starting time of 8:30 a.m. and shall end at 3:30 p.m. No work shall be allowed prior to the regular starting time or after 3:30 p.m. time, unless approved by the Engineer. Any work after 3:30 p.m. on a normal workday shall be subject to an overtime inspection charge of $100/hour.
Lane closures will be allowed within the working hours set forth in the Special Provisions and construction drawings. The contractor shall be required to open all traffic lanes to vehicular traffic at all other times. Limitations to the hours for lane closures may be less than the working hours set forth herein.
Unless a separate bid item is provided, full compensation for conforming to the requirements of this subsection shall be considered as included in the contract bid price paid for various other items of work, and no additional compensation will be allowed.
Working hours within the intersections shall be limited to 8:30 a.m. and 3:30 p.m.
Contractor shall maintain travel lanes and turn lanes as shown on the traffic control plans.
No work shall be allowed from 8:30a.m. and 3:30 p.m. Friday (or 3:30 p.m. the day before 852
Project and Specification No. 25-10,
State Funded Project NO. CRASL-5312(106)
IG(03/25)
(GENPROVS)
GP-27
a holiday) until 7:00 a.m. the next working day. No work shall be permitted on weekends (unless specified in the plans and/or special provisions), holidays, or during the Orange County Fair and holiday moratorium periods. The City observed holidays are: New Years Day, Martin L. King Holiday, Presidents Day, Memorial Day, 4th of July, Labor Day,
Veterans Day, Thanksgiving, the Friday after Thanksgiving, and Christmas. The observance date shall concur with Federal guidelines. 6-6 SUSPENSION OF THE WORK
6-6.1 General
[Add the following to this subsection:].
Should suspension of work be ordered by reason of the failure of the contractor to carry out orders or to perform any provisions of the contract; or by reason of weather conditions being unsuitable for performing any item or items of work; the contractor, at its expense, shall do all the work necessary to provide a safe, smooth, and unobstructed passageway through construction for use by public traffic during the period of such suspension. In the event that the contractor fails to perform the work above specified, the City will perform such work and the cost thereof will be deducted from payment due or to become due to the contractor.
If a suspension of work is ordered by the Engineer, due to the failure on the part of the contractor to carry out orders given or to perform any provision of the contract, the days on which the suspension order is in effect shall be considered working days. 6-7 TERMINATION OF THE CONTRACT FOR DEFAULT
6-7.3 Notice of Termination for Default
[Replace the 1st Paragraph with the following:].
The ENGINEER will makethe
determination if the Contractor had failed to commence
satisfactory corrective action within 5 working days after the receipt of the notice to cure, or to diligently continue satisfactory and timely correction of the default thereafter, and will take action as allowed by the Contract Documents.
6-7.4 RESPONSIBILITIES OF SURETY
[Add the following:].
Within 3 working days of receipt of the written notice of termination for default, the Surety shall provide the services needed to maintain the project in accordance with the Contract Documents. The services shall maintain the existing traffic control in place and the maintenance of the project site until the Engineers review and acceptance of theSuretys plan for course of action.
6-9 LIQUIDATED DAMAGES
853
Project and Specification No. 25-10,
State Funded Project NO. CRASL-5312(106)
IG(03/25)
(GENPROVS)
GP-28
[Replace the 1ST Paragraph with the following:].
The CONTRACTOR shal
l pay
to the CITY the sum of$3,000 per calendar day, for each and every calendar days delay in finishing the Work in excess of the number of Working Days prescribed within these General Provisions and the Agreement, or per the direction of the Engineer. Liquidated damages are calculated per Chapter 12 of the latest edition of the Caltrans Local Assistance Procedures Manual (LAPM). Execution of the contract under these specifications shall constitute agreement by the Agency and Contractor that $3,000 per calendar day is the minimum value of the costs and actual damage caused by failure of the Contractor to complete the Work within the allotted time. Such sum is liquidated damages and shall not be construed as a penalty, and may be deducted from payments due the Contractor if such delay occurs.
In addition to the liquidated damages specified, if the Contractor fails to complete the work within the time specified for completion, plus any authorized time extensions, the Agency shall have the right to charge to the Contract all or any part, as it may deem proper, of the actual costs of inspection, supervision and other overhead expenses that are directly chargeable to the project and that accrue after the expiration of such specified time for completion plus authorized extensions. This charge will be addition to the payment of liquidated damages.
SECTION 7 MEASUREMENT AND PAYMENT
7.2 LUMP SUM WORK
[Add the following to this subsection:].
Contractor shall submit for approval a schedule of values for all lump sum work. Failure to submit may delay payment for said work.
7.3 PAYMENT
7-3.1 General
[Replace the 1ST Paragraph with the following:].
Payment for the various itemslisted
on the Bid Proposal, as further specified herein, shall constitute full compensation to the Contractor for furnishing all material, tools, equipment, supplies, and manufactured articles, and for all labor, operations, and incidentals appurtenant to the items of Work and as specified and shown on the drawings, including all costs for compliance with the regulations of public agencies having jurisdiction, including Safety and Health Requirements of the California Division of Industrial Safety and the Occupational Safety and Health Administration (OSHA) of the U.S. Department of Labor. No separate payment will be made for any item that is not specifically set forth in the Bid Proposal. Costs arising from violations of regulations will be paid by the offending party to the extent that there will be no additional cost to the CITY. 854
Project and Specification No. 25-10,
State Funded Project NO. CRASL-5312(106)
IG(03/25)
(GENPROVS)
GP-29
When no bid item is provided for work/improvement shown or indicated on the plans and spe
cifications, payment for such work/improvement will be considered to be included in various applicable items of work.
7-3.2 Partial and Final Payment
[Replace the 1st Paragraph in its entirety with the following:].
The closure date for the
purpose of making partial progress payments will be the last day of each month. The Contractor may request, in writing, that such monthly closure date be changed. The ENGINEER may approve such request when it is compatible with the CITYs payment procedure.
[Replace the 2nd Paragraph in its entirety with the following:].
Each month, the Contra
ctor shall meet with the Engineer, a minimum of three (3) working days prior to the submittal of the progress payment to the AGENCY, to finalize and receive approval regarding the measurement of the Work performed through the closure date and the estimated value of the progress payment based on the Contract Unit Prices or as provided for in the Standard Specifications. Any progress payment submitted without such approval will be considered incomplete and returned to the Contractor and no payment shall be considered until such approval is obtained. [Replace the 3rd Paragraph in its entirety with the following:].
The amount retained
and deducted by the BOARD shall be 5% of the progress estimates for all progress payments. No reduction in the amount of retention will be allowed.
However, after 50% of the work has been completed, if the BOARD finds that satisfactory progress is being made, it may make any of the remaining progress payments in full for actual work completed. The final payment of the retention amount to the Contractor shall be made thirty-five (35) days after the date of the recording of the Notice of Completion of the work after it is accepted by the CITY. The 5% withheld from each progress payment shall not include monies withheld for stop notices or other withholding by the CITY. The monies withheld for stop notice and other withholdings shall be in addition to the 5% withheld for retention. The amount of any liquidated damages will be deducted from earned progress payments due the Contractor.
[Add to end of Section the following:].
Contractor shall comply with the requirements of Division 2, Part 1, Chapter 7, Section 7107 of the California Public Contract Code.
The lead time for processing invoices for the monthly progress payments approved by the ENGINEER for inclusion on the warrant list of the CITY is governed by the rules and 855
Project and Specification No. 25-10,
State Funded Project NO. CRASL-5312(106)
IG(03/25)
(GENPROVS)
GP-30
regulations established by the Finance Department of the CITY. Monthly payments will be processed and paid
in accordance with the rules and regulations established or revised by the said Finance Department.
The Contractor shall submit all weight tickets or volumes of all materials used in the construction to the ENGINEER for checking and verification prior to any payment. Failure to do so will postpone the payment to the Contractor, until the matter is resolved satisfactorily.
The weight or volume from submitted tickets must correspond to the work done in the field; if not, the City shall reject the work without compensation to the Contractor, and/or the Contractor shall be directed to replace that work at no additional costs to the City.
After completion of the Contract, the BOARD shall, upon recommendation of the ENGINEER, accept the Work as completed and authorize the Final Payment.
The Final Payment shall be the entire sum found to be due the Contractor after deducting therefrom all previous payments and all amounts to be kept and all amounts to be retained under the provisions of the Contract. All prior partial estimates and payments shall be subject to correction in the final estimate and payment.
No certificate given or payment made under the Contract, except the final certificate or Final Payment, shall be conclusive evidence of full or substantial performance of this Contract; and no payment shall be construed to be an acceptance of any defective work or improper material.
The acceptance of Final Payment by the Contractor shall release the CITY, the BOARD, and the ENGINEER from any and all claims or liabilities on account of work performed by the Contractor under the Contract or any alterations thereof.
The Contractor shall record, on the set of contract documents maintained at the job site, deviations which have been made from the Contract Documents or approved shop drawings including buried or concealed construction and utility features which are revealed during the course of construction. Special attention shall be given to recording the horizontal and vertical location of all buried utilities that differ from the locations indicated, or which were not indicated on the Contract Documents. Said record documents shall be supplemented by detailed sketches as necessary or directed, to indicate fully the work as actually constructed.
Requests for partial payments shall not be approved until the record documents are brought up to date. Also, request for final compensation shall not be approved until all the variations between the work as constructed and as originally shown in the Contract Documents have been properly recorded and delivered to the City, after approved by the Engineer.
856
Project and Specification No. 25-10,
State Funded Project NO. CRASL-5312(106)
IG(03/25)
(GENPROVS)
GP-31
[Add the following:].
7-3.2.1 Prompt Progress Payment to
Subcontractors
Contractor shall comply with the requirements of Division 2, Part 1, Chapter 7, Section 7200 of the California Public Code.
The CONTRACTOR agrees to pay each subcontractor under this Agreement for satisfactory performance of its contract no later than 7 days from the receipt of each payment the CONTRACTOR receives from CITY.
The CONTRACTOR agrees further to release retainage payments to each subcontractor within 7 days after the retention payment is received by the CONTRACTOR.
Any delay or postponement of payment from the above referenced time frame may occur only for good cause following written approval of the CITY. Any violation of this provision shall subject the violating prime contractor or subcontractor to the penalties, sanctions and other remedies specified in Section 7108.5 of the Business and Professions Code.
This clause applies to both DBE and non-DBE prime contractors and subcontractors.
City will be strictly monitoring the Contractor for prompt payment to all subcontractors.
[Add the following:].
7-3.2.2 Prompt Pay Monitoring and Enforcement of Progress Payments The City of Costa Mesa will use the following monitoring and enforcement mechanisms to ensure that all subcontractors, includingDBEs, are promptly paid.
A. The City will strictly monitor the prime contractor or subcontractor(s) for prompt release of progress payments for all subcontracted work as follows:
1. The effective date of release is the date the City releases the check to the prime contractor by mailing or hand delivery at the City of Costa Mesa (has to be requested in writing ahead of time).
2. Prime contractor or subcontractor(s) to provide verification in writing that the subcontracts have been paid within 7 days or the time period agreed, from the effective date of release.
3. City may contact subcontractor(s) to confirm receipt of progress payment amount and if it was received within 7 days or the time period agreed from the effective date of release.
857
Project and Specification No. 25-10,
State Funded Project NO. CRASL-5312(106)
IG(03/25)
(GENPROVS)
GP-32
B. If the prime contractor or subcontractor(s) is found to be in default of Federal or State Codes concerning prompt
payment to subcontractors, City will enforce the following besides the disciplinary action, sanctions and penalties imposed per the codes:
1. City will withhold 150% of the monies due to the subcontractor(s) from the prime contractors next progress payment.
2. City may also elect to make the payment(s) directly to the subcontractor(s) without the primecontractors approval for the remainder of the contract. 7-3.3 Delivered Materials
[Replace in its entirety with the following:].
The cost of materials and equipment delivered, but not incorporated in said work, will not be included in the progress payment estimate unless otherwise provided in these Specifications. All materials shall be nontoxic and shall not contain asbestos and hazardous substances as established by applicable laws.
Materials delivered, but not in place, will not be classed as work done, except as otherwise provided in these Specifications.
7-3.4 Mobilization
[Replace in its entirety with the following:].
Mobilization shall consist of all preparatory work and operations. It shall include, but not be limited to, the movement of personnel, equipment, materials and incidentals to the project site necessary for work on the project. The mobilization shall include all other work and operations, which must be performed.
Mobilization shall also include the time, materials, and labor to move the necessary construction equipment to and from the job site and the project administration costs during the entire contract period.
This work shall include, but not be limited to protect-in-place and/or relocation of the facility to accommodate the construction of an improvement; including resetting curb drains through new curbing.
The Contractor shall provide supervisory personnel to keep the construction site in a safe condition and all other related work as required at all times. These requirements shall also apply to all non-working days during construction period. The Contractor is responsible for securing an adequate storage site for equipment and materials. 858
Project and Specification No. 25-10,
State Funded Project NO. CRASL-5312(106)
IG(03/25)
(GENPROVS)
GP-33
The Contractor shall have on the work site at all times, as his agent, a competent English speaking superintendent
capable of reading and thoroughly understanding the plans, specifications, and other related documents.
A minimum of one week before the start of construction, the Contractor shall video all areas where construction is to take place. The video shall be supplied to the Engineer before constructions begins. Videos will serve as a record of the existing conditions for disputes that may arise from restoration and should therefore be taken along the line of construction and site access and staging areas at sufficient detail as necessary to clearly depict details of existing conditions. Videos shall be a DVD or digital, in color, indexed and catalogued in such a manner that each photographed area is readily identifiable and shall also indicate the date and time (hours, minutes and seconds) when it was made.
The Contractor shall also video any unusual conditions encountered during construction that are not already a matter of photographic record. In any areas where existing conditions cannot be determined by means of videos, the areas shall be restored as approved by the Engineer at theContractors expense. All videos shall become the property of the City.
Payment for mobilization shall be considered as included in the other items of work and no additional compensation will be allowed therefore.
7-3.4.1 Travel Route for Trucking and Equipment
Plans indicating the travel route for the Contractor's equipment movement in and out of the work site must be submitted concurrently with the Haul Route Plan (Section 2-5.4) to the ENGINEER at the pre-construction meeting for approval prior to commencement of any work. The travel route plans, which meet the Citys requirements, will be approved and returned to the Contractor; otherwise, further revisions are required until they are acceptable to the City. The approved travel plans shall be strictly adhered to by the Contractor during all phases of the construction.
Any deviation from these requirements is not permitted. All theContractors operations will be ceased at once if the Contractor violates any of these requirements. No further payments will be made to the Contractor until problems are resolved according theCitys requirements.
7-3.4.2 Construction Sequence/Order of Work
In order to minimize the inconveniences to the residents and businesses, the contractor shall construct the Project and sequence the work where no two adjacent streets are closed at one time, and/or the nearest parking is no more than300 from the intersection 859
Project and Specification No. 25-10,
State Funded Project NO. CRASL-5312(106)
IG(03/25)
(GENPROVS)
GP-34
of the street being closed to traffic. The Contractor shall maintain adjacent streets open for ingressand egress
and for parking.
7-4 PAYMENT FOR EXTRA WORK
7-4.1 General
[Add the following to this subsection:].
For such extra work the contractor shall receive payment as agreed upon in writing, or shall be paid on force account. Work involving contract unit prices, the contractor shall not exceed any of the quantities in the proposal unless prior authorization from the engineer is obtained in writing.
Material charges shall be substantiated by valid copies of vendors invoices. Such invoices shall be submitted with the daily extra work reports, or if not available, they shall be submitted with subsequent daily extra work reports. When these daily extra work reports are agreed upon and signed by both parties, said reports shall become the basis of payment for the work performed.
7-4.2 Basis for Establishing Costs.
7-4.2.1 Labor
[Add the following:].
The compensation for employers payments of payroll taxes; workers compensation insurance; liability insurance; health and welfare; pension; vacation; apprenticeship funds; other direct costs resulting from Federal, State, or local laws; and for assessments or benefits required by lawful collective bargaining agreements to be applied to the actual cost for wages shall be23 percent for regular time and overtime. 7-4.3 Markups
7-4.3.1 Work by the Contractor
[Replace in its entirety with the following:].
The allowance for overhead and profit to be added to theContractors costs shall be as follows:
Labor: 20%
Materials: 15%
Contractor Owned Equipment 15%
Equipment Rental 10%*
Other Items and Expenditures 10%
860
Project and Specification No. 25-10,
State Funded Project NO. CRASL-5312(106)
IG(03/25)
(GENPROVS)
GP-35
To the sum of the costs and markups provided for in this section, 1 percent shall be added as compensation for bonding.
* Equipment
Rental rates shall be based on the latest applicable Caltrans Equipment Rental Rates.
7-4.3.2 Work by a Subcontractor
[Replace in its entirety with the following:].
When all or any part of the extra work is performed by a Subcontractor, the markup established in 7-4.3.1 shall be applied to the Subcontractors actual cost of such work. A markup of ten (10) percent on the first $5,000 of the subcontracted portion of the extra work and a markup of five (5) percent on work added in excess of $5,000 of the subcontracted portion of the extra work may be added by the Contractor.
No markups will be allowed for second tier or higher subcontractors. 7-6 SUMMARY OF PUBLIC CONTRACT CODE § 9204
The following procedure will apply to any claims by the Contractor on the City:
A claim is a separate demand on the City by a contractor on a public works project and sent by registered mail or certified mail with return receipt requested, for one or more of the following:
• A time extension, including relief from penalties for delay • Payment by the City of money damages under the terms of the contract • Payment of an amount that is disputed by the City
Initial Review
The claim must be supported by appropriate documentation. The City has 45 days within which to reviewthe
claim and provide the contractor with a written statement identifying the disputed and undisputed portions of the claim. If the City does not issue a written statement, the claim is deemed rejected in its entirety. The City will pay any undisputed portion of the claim within 60 days of issuing the statement.
Meet & Confer
If the contractor disputes theCitys written response, or if the City does not issue one, the contractor may requesti
n writing an informal conference to meet and confer for possible settlement of the claim. The City will schedule the meet and confer conference within 30 days of this request and provide a written statement identifying the remaining disputed 861
Project and Specification No. 25-10,
State Funded Project NO. CRASL-5312(106)
IG(03/25)
(GENPROVS)
GP-36
and undisputed portions of the claim within 10 business days of the meet and confer. The City will pay t
he undisputed portion within 60 days of issuing this statement.
Mediation
With respect to any disputed portion remaining after the meet and confer, the City and contractor will submit the
matter to nonbinding mediation, agree to a mediator within 10 business days after issuing the written statement, and share mediation costs equally. If mediation is unsuccessful, then the terms of the public works agreement and applicable law will govern resolution of the dispute.
Miscellaneous Provisions
Amounts not paid by the City in a timely manner bear interest at 7% per annum.
Subcontracto
rs may submit claims via this procedure through the general contractor.
The City and contractor may waive the requirement to mediate, but cannot otherwise waive these claim procedures.
862
Project and Specification No. 25-10
State Funded Project No. CRASL-5312 (106)
SP-1
SPECIAL PROVISIONS
PART 1-8
PART 1
GENERAL
100-1 GENERAL
BID ITEM
NO. 1: MOBILIZATION (5% MAXI
MUM)
BID ITEM NO. 2: ADDITIONAL WORK ITEMS
BID ITEM NO. 3: PREPARATION AND IMPLEMENTATION OF EROSION CONTROL
AND BEST MANAGEMENT PRACTICE
Additions/Modifications to Standard Specifications
The following additions are made to the latest edition of theStandard Specifications for Public Works Construction (The Greenbook), and the General Provisions stated within the Standard Specifications of this Project. Should there be a conflict between any of these provisions; the Special Provisions shall have precedence.
All work shall be performed in conformance with the latest edition of the Uniform Building Code as adopted by the City of Costa Mesa. The electrical, plumbing, and fire codes, and other regulations as adopted by the City of Costa Mesa Building Official shall apply to this project.
Where referenced in these specifications, the latest edition of theCity of Costa Mesa Standard Drawings and theWork Area Traffic Control Handbook(WATCH) published by Building News, Inc., shall also apply.
If the item of work is identified within the Proposal section of these Specifications, then the following bid item descriptions will provide the corresponding bid item numbering within each corresponding section of the Standard Specifications under the Subsection entitled Measurement and Payment or Payment. All other sections and subsections shall conform to the Standard Specifications unless modified herein.
The unit prices and lump sum amounts to be paid for under the bid items listed in the Proposal shall include full compensation for furnishing all labor, materials, tools, equipment and incidentals necessary for the completion of the work and for performing all work contemplated and embraced under the Contract, in accordance with the Plans and Contract Documents. This shall include the Contractor's costs involved with bonding, insurance, worker's compensation, overhead, financing, obtaining required permits and permit fees, mobilization, traffic control, public convenience and safety, protective barricading/fencing, sanitary facilities, storage of equipment and materials, security against theft and vandalism, project site maintenance, dust and runoff control, clean-up including all costs for compliance with the regulations of public agencies having jurisdiction, including Safety and Health Requirements of the California Division of 863
Project and Specification No. 25-10
State Funded Project No. CRASL-5312 (106)
SP-2
Industrial Safety and the Occupational Safety and Health Administration (OSHA) of the U. S. Department of Labor, and allother
items related to the work.
Payment for compliance with the following provisions shall be included in the various bid items of work unless otherwise modified in the special provisions section. No additional compensation will be allowed.
No separate payments will be made for any items that are not specifically set forth in the Bid Proposal. Payments for any such items are included in various bid items of work.
Costs arising from violations of regulations will be paid by the offending party to the extent that there will be no additional cost to the City.
Payment for unit price work shall be made for the actual quantities of Contract Items removed, constructed, or disposed of in accordance with the Plans and these Specifications. Measurement of Unit Price work shall be specified in the Standard Specifications, Section 7-1, "Measurement of Quantities for Unit Price Work." Payment for Lump Sum work shall be paid for at the price indicated in the Bid, in accordance with the Standard Specifications, Section 7-2, "Lump Sum Work." Payment for all work shall be included in the various bid items. No additional compensation shall be made therefore. Work associated with each bid item shall include, but not be limited, to the bid descriptions set forth herein.
Bid Item 1: Mobilization (5% Maximum)
Mobilization shall comply with Section 7-3.4 of the General Provisions.
Add the following:
Mobilization shallco
nsist of preparatory work and operations including, but not limited to, those necessary for the movement of personnel, equipment, supplies and incidentals to the project site. Mobilization shall additionally include the establishment of any temporary facilities, utilities, construction fencing and barricades, and the provision and installation of project signs.
Mobilization shall also include the time, materials, and labor to move the necessary construction equipment to and from the job site and the project administration costs during the entire contract period.
Mobilization shall include all work shown on the plans, which is not compensated in a bid item of work. This work shall include, but not be limited to protect-in-place and/or relocation of the facility to accommodate the construction of an improvement, restoration and adjustment of existing improvements, and establishing the location and depth of city traffic signal conduit, by potholing as necessary, where significant excavation may occur.
Underground facilities on these plans are for reference only. It is the contractors responsibility to determine the exact location of potentially conflicting conduit. 864
Project and Specification No. 25-10
State Funded Project No. CRASL-5312 (106)
SP-3
The Contractor shall obtain bonds, insurance, and financing for entire project prior to beginning work.
The Contractorsha
ll provide supervisory personnel to keep the construction site in a safe condition and all other related work as required at all times. These requirements shall also apply to all non-working days during construction period. The Contractor is responsible for securing an adequate storage site for equipment and materials.
The Contractor shall have on the work site at all times, as his agent, a competent English- speaking superintendent capable of reading and thoroughly understanding the plans, specifications, and other related documents.
A minimum of one week before the start of construction, the Contractor shall video all areas where construction is to take place. The video shall be supplied to the Engineer before constructions begins. Videos will serve as a record of the existing conditions for disputes that may arise from restoration and should therefore be taken along the line of construction and site access and staging areas at sufficient detail as necessary to clearly depict details of existing conditions. Videos shall be a DVD or digital, in color, indexed and catalogued in such a manner that each photographed area is readily identifiable and shall also indicate the date and time (hours, minutes and seconds) when it was made.
The Contractor shall also video any unusual conditions encountered during construction that are not already a matter of photographic record. In any areas where existing conditions cannot be determined by means of videos, the areas shall be restored as approved by the Engineer at theContractors expense. All videos shall become the property of the City.
Payment for Bid Item No. 1: Mobilization (5% Maximum)
Full compensation for the requirements of Mobilization (5% Maximum) will be paid for at the contract LUMP SUM (LS) pri
ce bid, and shall include mobilization and
demobilization for the entire contract period, securing a storage yard to store all equipment and materials to be used on the job, temporary, handling of sewage, disposal of waste materials, restoration of the site, all labor, tools, equipment, materials, warranties, providing as-built plans, work schedules, providing bonds, insurance, financing, permits and permit fees, public notifications, public notifications & coordination, moving equipment to the job site and all incidentals required to complete the work. It shall be considered full compensation for obtaining all business licenses and permits, as required for the entire project, from all related agencies, including, but not limited to, utility companies, private and public agencies and the CITY; and complying with the requirements specified in those licenses and permits; coordination, field office facility, all required submittals specified within these Specifications, and incidentals necessary to perform all related items of work. Progress payments for Mobilization and Demobilization bid item shall be paid for in accordance with the completion percentage of the Project to the Contractor and shall include the cost of such mobilization/demobilization and administration during the entire Contract period.
Progress payments for Mobilization and Demobilization bid item shall be paid for in accordance with the completion percentage of the Project to the Contractor and shall 865
Project and Specification No. 25-10
State Funded Project No. CRASL-5312 (106)
SP-4
include the cost of such mobilization/demobilization and administration during the entire Contract period. No additional compensati
on will be allowed.
The maximum price for this bid itemshall not exceed 5 percent (5%)of the total contract price at the time of award. No additional compensation will be allowed therefore. 100-3 CON
TROL OF THE WORK
Bid Item No. 2: Preparation and Implementation of Erosion Control and Best Management Practice
100-3.1 WATER POLLUTION CONTROL AND BEST MANAGEMENT PRACTICES Contractor shall fo
llow the water pollution control and Best Management Practices (BMPs) guidelines enumerated in Section 3-12.6 of theStandard Specifications for Public Works Construction (The Greenbook), and also Section 3-12.6 of the General Provisions stated within theStandard Specifications of this Project and these contract bid documents.
Per the Federal Clean Water Act, the Contractor is required to eliminate pollution to waters of the United States in regard to this project. This project will require the Contractor to implement Best Management Practices (BMP's).
The Contractor shall submit an Erosion Control Plan (ECP). Erosion and Sediment Control Plans shall be prepared by the Contractor as part of the contract shall outline specific BMP's to be used during construction to ensure that sediment from storm runoff and construction activities does not enter storm drains. Some of the primary water pollution control measures anticipated for this project include, but are not limited to, covering all storm drain inlets in the project vicinity with water permeable fabric and gravel bags prior to performing any removal or paving operations; properly fueling and cleaning all equipment/vehicles; maintaining an ample supply of gravel/sand bags on-hand when excavating new PCC ramp/curb/gutter improvements in the event of rain; properly containing chemicals required to install the detectable warning mats; properly covering all incoming material trucks and all outgoing debris hauling vehicles; providing restroom facilities for workers; and regular street sweeping of the Work Area and Haul Routes to the satisfaction of the Engineer.
The requirements of all of the following agencies shall be met and maintained and where there is a conflict between requirements, the most stringent requirement shall govern.
1. Regional Water Quality Control Board
2. Orange County Flood Control District
The Contractor shall submit a Best Management Practice (BMP) Plan for containing any wastewater or storm water runoff from the project site including, but not limited to the following:
1. No placement of construction materials where they could enter storm drain 866
Project and Specification No. 25-10
State Funded Project No. CRASL-5312 (106)
SP-5
system, which includes gutters that lead to catch basins.
2. Checking construction vehicles for
leaking fluids.
3. Providing a controlled area for cleaning or rinse-down activities.
4. Monitoring construction activities.
5. Minimizing usage of water when saw-cutting and vacuum the residue.
6. Providing measures to capture or vacuum-up water contaminated with construction debris.
7. Removing any construction related debris on a daily basis. 8. Protecting work areas from erosion.
The BMP will be approved by the Engineer prior to any work. The City of Costa Mesa will monitor the adjacent storm drains and streets for compliance. Failure of the Contractor to follow BMP plan will result in immediate cleanup by City and back-charging the Contractor for all costs plus 15 percent. It is assumed that the Contractor will apply for theSmall Construction Rainfall ErosivityWaiver as defined in the General Permit. Filing of the waiver does not relieve the Contractor of submittingBMPs to be used on site during construction, nor does it relieve the Contractor from conforming to the storm water requirements of the State Water Resources Control Board. The Contractor shall complete the electronic Notice of Intent (NOI) and Sediment Risk form through the State Water Boards SMARTS system, certifying that the construction activity will take place during a period when the value of the rainfall erosivity factor is less than five. In the event that the Rainfall Erosivity Waiver is not granted by the State Water Resource Control Board, the Engineer shall be notified immediately.
The Contractor shall confirm that all of the BMP's have been adequately detailed to address the anticipated construction operations. The proposed ECP shall be submitted to the City prior to the start of any earthwork.
Payment for Bid Item No. 3: Prepare and Implement Erosion Control and Best Management Practice
Measurement and Payment for the preceding shall be at the lump sum (LS) price to Prepare and Implement
ECP and BMP and shall be considered full compensation for all costs incurred by the Contractor for Preparation and submittal of the Erosion Control Plan, Implementing Best Management Practices, and the costs of any required permits.
Additional compensation shall not be allowed.If applicable, the payment will include preparation and filing of the Notice of Intent (NOI) and Small Construction Rainfall Erosivity Waiver as specified herein and as described in the SSPWC , all National Pollutant Discharge Elimination System (NPDES) and all related activities, clean-up and incidentals required to complete the work in place.
Payment for this item, including all NPDES related activities, shall be paid as a percentage of completed work to date.Payment shall be made as the work proceeds and shall constitute full compensation for the completion of the work. It shall be paid as follow: 1/3 at start of construction, 1/3 at 50% completion of the work and 1/3 at 100% completion of the work.
100-4 ADDITIONAL WORK ITEMS
867
Project and Specification No. 25-10
State Funded Project No. CRASL-5312 (106)
SP-6
100-4.1 GENERAL
This work item entails
work beyond the Scope of Work established within the Plans, Specifications, and Standard Specifications as directed by the ENGINEER with a specified Contract allowance
Bid Item No. 2: Additional Work Items
This work item entails work beyond the Scope of Work established within the Plans, Specifications, a
nd Standard Specifications as directed by the ENGINEER with a specified Contract allowance
Allowance to be included in the total bid amount is identified as follows. Use of the allowance will be at the sole discretion of the City and must be authorized in writing at the discretion of the City. Any money used from the project allowance will be authorized via an Allowance Disbursement Form at theCitys sole discretion. Any amount of money remaining in the Allowance line item upon completion of the Project will be deducted from the Contract by Deductive Change Order for the full amount(s) remaining therein. The Contractor has no beneficial interest in, and/or claim to, the Allowances and hereby disclaims any and all such interests.
Additional work items include work that will only be used at the discretion of the Engineer.
At the discretion of the Engineer, the Contractor shall provide all labor, tools, equipment, materials and incidentals for the extra work beyond the scope of work established within the Contract documents. Work may include, but not be limited to, delivery of additional newsletters; disposal of materials, potholing, furnishing and installation of informational signs, and related work, and will only be performed, if required, and approved by the Engineer. The Contractor acknowledges that this allowance will only be used at the discretion of the City. Contractor shall be paid at force account or at agreed prices for all work performed within this allowance.
Bid Item No. 2: Measurement and Payment
Additional Work Items Allowance shall be paid perForce Account (FA) for all work performed pursuant to Section 7-4.2 of these Specifications and shall, include all labor, tools, equipment, materials and incidentals as required to complete the work as directed by the ENGINEER.
Bid Item No. 4: Unclassified Excavation (Fill)
Measurement and Payment for all the preceding shall be at the unit price bid per cubic yard (CY) price. This item
includes all sawcut, removal and disposal of PCC, AC,
aggregate base, and native soil including Petromat/pavement reinforcing fabric, macadam, abandoned concrete and/or steel culverts, unsuitable materials, irrigation improvements, plants, root pruning, removal of existing base material and other unclassified excavation necessary to establish the finished subgrade elevations for the improvements, as detailed in the plans. The unit price bid shall include subgrade preparation and compaction; including all labor, tools, material, equipment and incidentals required to complete the work. No further compensation will be allowed. The Unclassified 868
Project and Specification No. 25-10
State Funded Project No. CRASL-5312 (106)
SP-7
Excavation bid items are a Final Pay quantity and no additional compensation will be allowed. Payment f
or any over-excavation shall be per Section 3-3Extra Work as modified by the General Provisions.
Bid Item No. 5: Variable Cold Mill 2-inches
Measurement and Payment for the requirements of Cold Mill Existing Pavement2 Minimum shall b
e at the contract unit price bid per Square Foot (SF) and will be based on the actual area of surface planed regardless of the number of passes required. The contract price paid per square yard shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for doing all work involved in cold milling the existing A.C., P.C.C., pavement reinforcing fabric/Petromat, macadam, or other miscellaneous improvements, removal of old AC/slurry lip overage from gutter pan, and disposing of material removed, per Typical Sections and Details shown on Plans, , as specified in these special provisions and as directed by the Engineer. No additional compensation will be allowed, therefore.
Bid Item No. 6: Asphalt Concrete (AC) Pavement
Measurement and Payment to constructAC Pavement shall be made at the unit price bid per tonnage
(Ton). The unit price bid shall include subgrade preparation, surface preparation, AC Type Specified herein inclusive of the added AC depth to meet existing grade before cold milling operations, tack coat, temporary AC tapers, and all labor, material, saw cutting, transitioning, hauling, spreading, compacting, grading, equipment and incidentals required to complete the Work in accordance with these Specifications, as shown on the Plans, and no further compensation will be allowed.
Temporary asphalt concrete work where required by the ENGINEER for traffic control or other purposes shall be considered included in the price bid for the various items of work and no further compensation will be allowed.
Bid Item No. 7: Asphalt Rubber Hot Mix (ARHM-G) Asphalt Concrete Course Measurement and payment forTypeGG-CAsphalt Rubber Hot Mix (ARHM-G) Surface Course shall be
made at the unit price bid per Tonnage (TON), based upon certified weigh master tickets. The unit price bid shall include, surface preparation, ARHM specified herein, tack coat, temporary AC tapers, rock dust blotter, sweeping, and all labor, material, saw cutting, transitioning, hauling, spreading, compacting, grading, equipment and incidentals required to complete the Work in accordance with these Specifications, as shown on the Plans, and no further compensation will be allowed.
Temporary asphalt concrete work where required by the ENGINEER for traffic control or other purposes shall be considered included in the price bid for the various items of work and no additional compensation will be allowed
Bid Item No. 8: Construct Crushed Miscellaneous Base (CMB) Measurement and Payment for Construct CMB shall be per the unit price bid per tonnage (Ton) and shall
include full compensation for furnishing all labor, materials, tools, 869
Project and Specification No. 25-10
State Funded Project No. CRASL-5312 (106)
SP-8
equipment, hauling, spreading, compacting, grading, and incidentals for completing all work as required. No additional
compensation shall be allowed.
Bid Item No. 9 Construct Variable Height Retaining Curb 0 to 8 over 6 CMB Measurement and payment to Construct Variable Height Retaining Curb0 to 8 over 6 CMB ), shall be per
the unit price bid per lineal foot (LF) of curb and shall include sub- grade preparation, full compensation for furnishing all labor, equipment, and materials for crushed miscellaneous base (CMB) ,forms, backfilling behind curbs, grading behind curbs, restoring form areas and all other work as required to complete the work. No other compensation will be allowed
Bid Item No. 10: Construct 8 Curb and Gutter over 6 CMB Measurement and payment to Construct8 Curb and Gutter over6 CMB shall be per the unit price bid
per lineal foot (LF) of curb and gutter and shall include sub-grade preparation, full compensation for furnishing all labor, equipment, and materials for crushed miscellaneous base (CMB), forms, backfilling behind curbs, grading behind curbs, restoring form areas and all other work as required to complete the work. New curb and gutter along bus pads shall be included in this bid item. No other compensation will be allowed.
Bid Item No. 11: Construct 4" PCC Sidewalk over 4 of CMB Measurement and payment to Construct 4" PCC Sidewalk over4of CMB, shall be per the unit price bid per
square foot (SF) and shall include sub-grade preparation, full compensation for furnishing all labor, equipment, and materials for crushed miscellaneous base (CMB) , forms, temporary AC pavement, backfilling behind sidewalk, grading behind sidewalk, restoring form areas and all other work as required to complete the work No additional compensation will be allowed.
Bid Item No. 12: Construct an 8 drive approach over 8 CMB Measurement and payment to construct an8drive approach over8CMB shall be per the unit price bid per Square Foot
(FT). Unit prices shall include excavation, sub-grade
preparation, forms, temporary AC pavement, and all other work as required to complete the work. No additional compensation will be allowed.
Bid Item No. 13: Construct 8-inch Drive Approach over 8-inch Crushed Miscellaneous Base (CMB)
Measurement and payment to construct an8drive approach over8CMB shall be per the unit price bid per Square Foot
(FT). Unit prices shall include excavation, sub-grade
preparation, forms, temporary AC pavement, and all other work as required to complete the work. No additional compensation will be allowed.
Bid Item No. 14: Adjust and Reset Existing Survey Monuments and Ties per California Licensed Land Surveyor
870
Project and Specification No. 25-10
State Funded Project No. CRASL-5312 (106)
SP-9
Resetting of survey monuments shall be executed in accordance with Standard Specifications for
Public Works Construction Section 309. The Contractor is responsible for locating and tying existing survey monuments and centerline points prior to construction, reestablishing such monuments or points after construction, and filing Corner Records (Pre-construction and Post-construction) with the County Surveyor before the project may be considered for acceptance by the agency.
Measurement and Payment for Reset Survey Monument shall be at the unit bid price per each item and include supplying all labor, materials, equipment and incidentals to complete the work per plans and specifications and no additional compensation shall be allowed.
Bid Item No. 15: Signing and Striping
Measurement and payment for theSigning and Striping shall be per the unit price bid per Lump Sum (LS)
and Signing and Striping shall include full compensation for traffic control, preparation, cat tracking, striping, legends, RPMs, signs, all work required to complete the bid item, and the furnishing of all labor, materials, tools and appurtenances necessary to complete all work involved as specified on the plans and specifications and no additional compensation will be allowed, therefore.
Bid Item No. 16: Furnish and Install Pull Boxes
Measurement and Payment forBid Item No. 16: Furnish and Install PullBoxesshall be per the unit price bi
d per Each (EA), and shall be considered full compensation for providing all labor, materials, tools, equipment, other work and incidentals to accomplish the work in accordance with the Plans, Specifications, pursuant to Caltrans Standard Plans and Specifications, and no additional compensation shall be allowed.
Bid Item No. 17: Temporary Traffic Control - Pedestrian Control, Construction Phasing/Staging, Public Convenience & Safety
Full compensation for the requirements of Temporary Traffic & Pedestrian Control, Construction Phasing&
Public Convenience & Safety will be paid for at thecontract LUMP SUM (LS) price bid, and shall include all labor, tools, equipment, materials and incidentals necessary to provide measures to protect and maintain traffic and pedestrians, twenty-four (24) hours per day during the life of the Contract, including preparation and processing of a traffic and pedestrian control and construction phasing plans for City approval prior to the start of construction, temporary pavement, detours, the furnishing of such personnel, flaggers, traffic control supervisor, including the furnishing of daily records of traffic control activities, barricades, four (4) portable changeable message signs (PCMS), temporary pavement markings and striping (paint and tape), barrier rails, non-climb fencing, flashers, bridges, plates, furnishing, installing signs, coordination, notifications, signage, and all other incidentals required to complete the work as may be required to ensure the safety of the traveling public and pedestrians in accordance with these Special Provisions. A traffic and pedestrian control plan for each phase of construction must be submitted and approved prior to commencing any work in that phase of the construction. No additional compensation will be allowed therefore.
Progress payments shall be pro-rated in proportion to the total value of work completed to 871
Project and Specification No. 25-10
State Funded Project No. CRASL-5312 (106)
SP-10
date as a function of the total awarded contract amount.
Bid Item No. 18:
Median Clearing and Grubbing
Measurement and payment for the preceding shall be at the lump sum (LS) price for Median Clear & G
rub and Unit price shall include labor, equipment, and materials as required to complete the work. No additional compensation will be allowed.
Bid Item No. 19: Median Landscaping
Work of this section completed in accordance with the Contract Documents will be paid for at Lump Sum
(LS) unit price as listed in the Schedule of Quantities and Prices. This price shall be full compensation for furnishing all labor, materials, tools, equipment, supplies, supervision, and incidentals necessary to complete the work of this section as described by the Contract Documents. Lump Sum, partial payment will be in accordance with the Schedule of Values submitted by the Contractor.
Bid Item No. 19A: Landscape Maintenance (90 Days)
Work of this sectioncomp
leted in accordance with the Contract Documents will be paid for at the Lump Sum (LS) unit price as listed in the Schedule of Quantities and Prices.
This price shall be full compensation for furnishing all labor, materials, tools, equipment, supplies, supervision, and incidentals necessary to complete the work of this section as described by the Contract Documents. Lump Sum partial payment will be in accordance with the Schedule of Values submitted by the Contractor.
Bid Item No. 20: Median Irrigation
Work of this section completed in accordance with the Contract Documents will be paid for at thea
pplicable unit price as listed in the Schedule of Quantities and Prices. This price shall be full compensation for furnishing all labor, materials, tools, equipment, supplies, supervision and incidentals necessary to complete the work of this section as described by the Contract Documents. For Lump Sum, partial payment will be in accordance with the Schedule of Values submitted by the Contractor.
Bid Item No. 21: Construct 9-inch Portland Cement Concrete (PCC) Bus Pad over 12-inch Crushed Miscellaneous Base (CMB)
Measurement and payment to construct a 9 bus pad over 12 CMB shall be per the unit price bid per Square
Foot (SF). Unit prices shall include excavation, sub-grade preparation, forms, temporary AC pavement, and all other work as required to complete the work. No additional compensation will be allowed.
Bid Item No. 22: Construct Portland Cement Concrete (PCC) Bus Boarding Islands and Portland Cement Concrete (PCC) Median Cut-Through
Measurement and payment to Construct PCC Bus Boarding Islands and PCC Median Cut Through shall beper
the Square Foot (SF). Unit prices shall include excavation, sub- grade preparation, forms, metal hand railings, restoring form areas, temporary AC 872
Project and Specification No. 25-10
State Funded Project No. CRASL-5312 (106)
SP-11
pavement, and all other work as required to complete the work. All proposed curbs are part of th
e PCC Islands & Median Cut Through quantity. No additional compensation will be allowed.
Bid Item No. 23: Construct 8-inch Portland Cement Concrete (PCC) Spandrel over 8-inch Crushed Miscellaneous Base (CMB)
Measurement and payment to construct an8 PCC Spandrel over8 CMB shall be per the unit price bi
d per Square Foot (SF). Unit prices shall include excavation, sub-grade preparation, forms, temporary AC pavement, and all other work as required to complete the work. No additional compensation will be allowed.
Bid Item No. 24: Furnish and Install Traffic Loops
Measurement and Payment forBid Item No. 24: Furnish and Install Traffic Loops shall be per the
unit price bid per Each (EA) inductive loop detector installed, and shall be considered full compensation for providing all labor, materials, sawcut, epoxy and AC fill, new 2 stub outs (curb termination conduit) as required, home-run connections, tools, equipment, other work, testing detection connectivity, and incidentals to accomplish the work for full signal loop operation in accordance with the Plans, Specifications, pursuant to Caltrans Standard Plans and Specifications, and no additional compensation shall be allowed.
Bid Item No. 25: Furnish and Install Pedestrian Hybrid Beacon (HAWK Signal) and Bid Item No. 26: Traffic Signal Modification (Fairview/Wilson) Measurement and Payment to Furnish and InstallBid Item No. 25: Furnish and Install Pedestrian Hybrid Beaco
n (HAWK Sig nal) and Bid Item No. 26: Traffic Signal
Modification (Fairview/Wilson) shall be per the Lump Sum (LS) price and additional compensation shall not be allowed. The Lump Sum price shall include full compensation for furnishing all labor, material, appurtenances, tools, equipment and incidentals, potholing of all new traffic signal pole foundations, and for doing all work involved as specified on the Plans and these Specifications.
Bid Item No. 27: Furnish and Install Flexible White K-71 Posts Measurement and payment for theFurnishand Install Flexible White K-71Postsshall be per the
unit price bid per each (EA) and shall include full compensation for all work required to complete the bid item, and the furnishing of all labor, materials, tools and appurtenances necessary to complete all work involved as specified on the plans and specifications and no additional compensation will be allowed, therefore.
Bid Item No. 28: Furnish and Install Green Preformed Thermoplastic Markings Measurement and payment for theFurnish and Install Green Preformed Thermoplastic Markings shall be
per the unit price bid per square foot and shall include full compensation for all work required to complete the bid item, and the furnishing of all labor, materials, tools and appurtenances necessary to complete all work involved as specified on the plans and specifications and no additional compensation will be allowed, therefore. 873
Project and Specification No. 25-10
State Funded Project No. CRASL-5312 (106)
SP-12
Bid Item No. 29A
and 29B: Adjust Orange County Sanitation District (OCSD) Manhole Covers to Grade
Payment forAdjustCosta Mesa Sanitation District (OCSD) Manhole Covers to Grade shall be per the
unit price bid per Each (EA) and shall include removal and disposal of existing improvements, adjusting the manhole to grade, and providing all labor, tools, equipment, materials, and incidentals necessary for doing the work in compliance with Orange County Sanitation District (OCSD standards, the Standard Specifications, these Special Provisions, as shown on the Plans, and to the provisions of the City of Costa Mesa Standard Plans, and no additional compensation shall be allowed.
Bid Item 30: Adjust Costa Mesa Sanitation District (CMSD) Manhole Frame & Cover to Grade
Full compensation for the requirements of Adjust Manhole Frame & Cover to Grade will be paid forat
the contract unit price bid per EACH (EA), and shall include all labor, tools, equipment and materials necessary to complete the work involved in adjusting existing Costa Mesa Sanitary District (CMSD) sanitary sewer manhole frames and covers to new finished grade in conformance with Costa Mesa Sanitary District Standard Drawing No. S-105 and Specifications, as required, including lowering and temporary A.C. ramping, replacing damaged manhole rings and covers as directed by the Engineer, and all incidentals. No additional compensation will be allowed.
Bid Item No. 31: Adjust Utility and Water Valves to Grade Payment forAdjust Utility and Water Valves to Grade shall be per the unit price bid per each (EA) and shall include removal and disposal of existing improvements, adjusting the water valve to grade, providing all labor, tools, equipment, materials, and incidentals necessary for doing the work in compliance with Mesa Water District (MWD), Irvine Ranch Water District (IRWD), etc., standards, the Standard Specifications for Public Works Construction, as shown on the Plans, and to the provisions of the City of Costa Mesa Standard Plans and no additional compensation will be allowed.
Bid Item 32: Adjust Storm Drain Manhole Frame & Cover to Grade Full compensation for the requirements of Adjust Storm Drain Manhole Frame & Cover to Gradewill
be paid for at the contract unit price bid per EACH (EA), and shall include all labor, tools, equipment and materials necessary to complete the work involved in adjusting existing storm drain manhole frames and covers to new finished grade in conformance with SPPWC Std. Plan No. 205-3, including temporary A.C. ramping, replacing damaged manhole rings and covers as directed by the Engineer, and all incidentals. No additional compensation will be allowed. 874
Project and Specification No. 25-10
State Funded Project No. CRASL-5312 (106)
SP-13
PART 2
SECTION 200 - ROCK MATERIALS
BID ITEM NO. 4: UNCLASSIFIED EXCAVA
TION
BID ITEM NO. 5: VARIABLE COLD MILL 2
BID ITEM NO. 6: ASPHALT CONCRETE (AC) PAVEMENT
BID ITEM NO. 7: ASPHALT RUBBER HOT MIX (ARHM-G) SURFACE COURSE BID ITEM NO. 8: CONSTRUCT CRUSHED MISCELLANEOUS BASE (CMB) BID ITEM NO. 9: CONSTRUCT VARIABLE HEIGHT PCC RETAINING CURB 0 TO 8 OVER 6 CMB
BID ITEM NO. 10: CONSTRUCT 8 CURB AND GUTTER OVER 6 CMB BID ITEM NO. 11: CONSTRUCT 4 PCC SIDEWALK OVER 4 CMB
BID ITEM NO. 12: CONSTRUCT 4 PCC CURB RAMP OVER 4 CMB INCLUDING FEDERAL YELLOW TRUNCATED DOMES
BID ITEM NO. 13: CONSTRUCT 6 PCC DRIVE APPROACH OVER 6 CMB BID ITEM NO. 21: CONSTRUCT 9-INCH PORTLAND CEMENT CONCRETE (PCC) BUS PAD OVER 12-INCH CRUSHED MISCELLANEOUS BASE (CMB)
BID ITEM NO. 22: CONSTRUCT PORTLAND CEMENT CONCRETE (PCC) BUS
BOARDING ISLANDS AND PORTLAND CEMENT CONCRETE (PCC) MEDIAN CUT-
THROUGH
BID ITEM NO. 23: CONSTRUCT 8-INCH PORTLAND CEMENT CONCRETE (PCC) SPANDREL OVER 8-INCH CRUSHED MISCELLANEOUS BASE (CMB)
200-1 ROCK PRODUCTS
200-1.2 CRUSHED ROCK AND ROCK DUST
200-1.2.1 GENERAL - Add the following:
Rock dust blotter shall conform to the requirements of Rock Dust per Table 200-1.2.1(A) of the SSPWC.
200-1.5 SAND
200-1.5.1 GENERAL - Add the following to the end of the section:
Sand bedding and shall conform to the requirements in this Section, and shall consist of washed granular material with a sand equivalent greater than or equal to 30.
Sand for structure backfill material shall have a sand equivalent of not less than 20 conforming to the gradation requirements shown in Table 217-3 of the Standard Specifications, as directed by the Engineer.
200-2 UNTREATED BASE MATERIAL
200-3 GENERAL - Add the following:
Untreated base shall be crushed miscellaneous base, as shown on the plans. 875
Project and Specification No. 25-10
State Funded Project No. CRASL-5312 (106)
SP-14
200-2 CRUSHED AGGREGATE BASE
200-2.2.1
GENERAL
Crushed aggregate base shall of the 2021 Edition of the Standard Specifications for Public Works Construction.
Crushed aggregate base for pipe bedding in trenches shall consist entirely of crushed rock and rock dust conforming to the requirements Section 217 of the Standard Specifications and these Special Provisions.
200-2.4.1 GENERAL - Add the following:
Crushed Miscellaneous Base material and construction shall conform to Subsections 200-2.4 and 301-2 of the Standard Specifications, and as directed by the Engineer.
Contractor shall install Crushed Miscellaneous Base (CMB) with line and grades to match final subgrade elevations as shown on the plans.
200-2.4.2 GRADING - Add the following to the end of the section:
The sieve size shall be¾ (fine).
200-2.5 PROCESSED MISCELLANEOUS BASE - Add the following:
200-2.5.3 QUALITY REQUIREMENTS - Add the following:
The minimum R-value requirement will not be waived.
200-2.5.5 TESTING - Subsection 200-2.5.5 is hereby added to Section 200 of the Standard Specifications as follows:
The Contractor shall be required to provide testing of materials for compliance with the requirements for processed miscellaneous base and shall bear all costs for testing of materials for compliance.
Measurement and Payment for Construct CMB shall be per the unit price bid per tonnage (Ton) and shall include full compensation for furnishing all labor, materials, tools, equipment, hauling, spreading, compacting, grading, and incidentals for completing all work as required. No additional compensation shall be allowed.
SECTION 201 - CONCRETE, MORTAR, AND RELATED MATERIALS
201-1 PORTLAND CEMENT CONCRETE
201-1.1 REQUIREMENTS
201-1.1.2 CONCRETE SPECIFIED BY CLASS AND ALTERNATE CLASS - Add the following:
876
Project and Specification No. 25-10
State Funded Project No. CRASL-5312 (106)
SP-15
Concrete for curb & gutter shall be Class 560-C-3250.
Concrete standard
class specified in the Standard Specifications shall apply for all other concrete materials, including but not limited to sidewalks, local depressions, curb ramps and storm drain structures.
201-1.4 MIXING
201-1.4.1 GENERAL - Add the following to the end of the section:
Mixed concrete delivered to the site shall be by Transit Mixer as called for in Section 201-
1.4.3 Transit Mixer of the Standard Specifications.
201-3 EXPANSION JOINT FILLER AND JOINT SEALANTS
201-3.1 GENERAL
The Contractor shall furnish and install crack seal, as required by the Engineer on all streets within the project limits. Materials, composition and grading, and mix design shall be in accordance with the requirements of Section 203-3 of the Standard Specifications, except as indicated in these special provisions.
201-3.7 TYPE D JOINT SEALANT (HOT POURED RUBBER-ASPHALT JOINT
SEALANT)
Crack seal material shall be Crafco Polyflex Type 2 or approved equal.
Immediately prior to crack sealing, the Contractor shall sweep and clean the pavement surfaces of all vegetation, dirt, oil deposits, and other objectionable materials. All pavement cracks wider than1/8 shall be cleaned using a wand and compressed air. The compressor used shall be a minimum of 90 cfm and equipped with a device to remove moisture from the compressed air. Air cleaning shall be performed immediately before the application of the crack sealant and shall remove all dust, dirt, oil and other foreign matter.
Sealant shall be applied at the recommended pour temperature using either a wand equipped with an applicator disk or a squeegee. The joint shall be filled to the top without the formation of voids. The top of the finish joint shall be between¼ and 3/8 below the finish surface.
The Contractor will be responsible for determining the extent of the crack sealing. He shall ensure that sufficient crack sealing is performed to prevent reflective cracking through to the new street surface. Prior to any crack sealing to be performed, the Contractor shall meet with the Citys representatives in the field to discuss the extent and adequacy of the work as well as the street surface preparation to receive crack sealant. 201-4 CONCRETE CURING MATERIALS
877
Project and Specification No. 25-10
State Funded Project No. CRASL-5312 (106)
SP-16
201-4.1.1 GENERAL - Concrete curing compound shall be Type 1-D.
SECTION 203 - BITUMINOUS MATERIALS
203-6 ASPHALT CONCRETE
203-6.
1 GENERAL
Dense graded asphalt concrete material (DGAC) for Base Course pavement within the roadway shall be Type III-B2-PG-64-10(3/4 sieve size). 203-11 ASPHALT RUBBER HOT MIX (ARHM) WET PROCESS
203-11.2 MATERIALS - The following is hereby added to Subsection 203-11.2:
The Asphalt Rubber Hot Mix Surface Course shall be Gap-Graded ARHM-GG-C-PG 64- 16 (1/2 sieve size) and at least 2-inches thick
203-11.2.3. CRUMB RUBBER MODIFIER (CRM) - The following is hereby added to Subsection 203-11.2.3:
Scrap Tire CRM used on this project shall be one hundred percent (100%) California waste tires. ARHM shall use a minimum of 20 pounds of scrap rubber per ton of mix. 203-11.5.d HAND HELD VISCOMETER TEST - The following is hereby added to Subsection 203-11.5.d:
Contractor shall have available a Haake Viscometer. Contractor shall take viscosity readings at least every hour at the point where asphalt-rubber enters the feed to the ARHM plant. Temperature of readings shall be constant at 375 degrees Fahrenheit.
Contractor shall log results including time and temperature, and shall notify the Engineer at the plant 15 minutes prior to each test. Samples shall be taken at a point where the material has not been exposed to material that is not fully isolated from the feed to the ARHM plant during times of production.
Contractor shall prepare a log of weights of asphalt, asphalt modifier, natural rubber, and tire rubber used in each tank of asphalt-rubber produced. The log of weights shall be made available to the Engineer on request.
878
Project and Specification No. 25-10
State Funded Project No. CRASL-5312 (106)
SP-17
PART 3
CONSTRUCTION METHODS
SECTION 300 EARTHWORK
[Add the
following:]
300-0 EARTHWORK IN STATE RIGH T-O
F-WAY
300-0.1 GENERAL
Unclassified excavation shall conform to all Sections 300-1Clearing and Grubbing, 300- 2, Unclassified Excavation and 300-4Unclassified Fill of the Standard Specifications and shall consist of all unclassified excavation required to construct the new roadway section, parkway, and offsite improvements in conformance with the line and grades set forth on the plans.
Measurement and payment to Construct 4" PCC Sidewalk over 4 of CMB (Bid Item No. 10), shall be per the unit price bid per square foot (SF) and shall include sub- grade preparation, forms, temporary AC pavement, backfilling behind sidewalk, grading behind sidewalk, restoring form areas and all other work as required to complete the work No additional compensation will be allowed.
All earthworks performed within the State of California Department of Transportation (Caltrans) Right-of-Way shall conform to the requirements of Section 19 of the latest edition of the "Standard Specifications and Standard Plans of the State of California, Department of Transportation, Division of Highways" with the appropriate Caltrans, City, and other applicable agency encroachment permits procured. 300-1 CLEARING AND GRUBBING
300-1.1 GENERAL
[Add or redefine the following:]
No burning will be permitted.
No accumulation of flammable material shall remain on or adjacent to the right-of-way.
The roadway and adjacent areas shall be left with a neat and finished appearance.
In order to protect the public streets from deterioration due to hauling of materials, the Contractor shall submit, prior to the pre-job meeting, for approval a proposed route for hauling of materials for disposal. Upon approval, the Contractor shall strictly adhere to that route, unless written permission from the Engineer is obtained to change the route.
Section 300-1, "Clearing and Grubbing," of the Standard Specifications is supplemented by the following:
Contractor shall field verify existing grades and shall accept site as is, for no other grading shall be performed by the CITY.
879
Project and Specification No. 25-10
State Funded Project No. CRASL-5312 (106)
SP-18
300-1.3 REMOVAL AND DISPOSAL OF MATERIALS
300-1.3.1
GENERAL
All materials removed shall be disposed of in a legal manner at an appropriate Disposal Site.
• 300-1.3.2 Requirements
A. Bituminous Pavement
Saw cutting of edges to be joined is required.
B. Miscellaneous
In addition to the work outlined in Section 300-1.1 of the Standard Specifications, the following items of work are included under Clearing & Grubbing unless otherwise covered by specific bid item.
1. Maintaining dust control at all times by watering during the entire time of the project, whether extended or not, including developing a water supply and furnishing and placing all water for all work done in the contract, including water used for extra work.
2. Application of soil sterilant, if applicable, or as directed by the ENGINEER.
3. Protection of utilities, structures, improvements and other facilities within the construction zone, except those specifically shown on the plans to be removed or relocated.
4. Removal and disposal of existing natural and artificial objectionable material within the limits of construction.
5. Verification of existing locations and elevations as shown on the plans or directed by the ENGINEER.
6. Replacement of disturbed traffic signs, street names, mailboxes, property owner signs, fences, landscaping, protection of temporary construction fences and all appurtenances, striping and markings as required to the satisfaction of the ENGINEER. Also, includes the installation of safe pedestrian pathway by installing orange netting or other approved method of safely directing pedestrians through a protected path.
7. This item shall also be interpreted to include the removal or relocation of any additional items in conflict with the proposed work not specifically mentioned herein or covered by specific bid item as directed in the field by the Engineer, which may be found within the work limits whether shown or not shown on the plans to be removed or relocated.
8. All surplus material three (3) inches or smaller shall be uniformly spread and compacted in the street sub grade. No material greater than three (3) inches in any dimension shall be used in the top twelve (12) inches of the sub grade. No nesting of rocks shall be allowed.
9. Unclassified fill shall consist of all fill unless separately designated. Construction of unclassified fill included preparing the area on which fill is to be placed, and the depositing, conditioning, and compaction of fill material. 880
Project and Specification No. 25-10
State Funded Project No. CRASL-5312 (106)
SP-19
10. Complete all demolition and removal work associated with the removal of AC, underlying PCC, PCC curb/gutter,
as designated on the drawings for removal,
unless otherwise defined.
11. Any structural or non-structural demolition work involved for the construction of the project and Contractor shall be responsible for disposing in a legal manner.
12. Determining and maintaining a straight edge in areas where AC joins existing edge of pavement.
13. No burning will be permitted.
14. No accumulation of flammable material shall remain on or adjacent to the right-of- way.
300-2 UNCLASSIFIED EXCAVATION
Unclassified excavation shall include removals of the following materials within the project limits to the required subgrade depth: asphalt concrete, aggregate base, native material, cement/lime treated material; slurry backfill; abandoned foundations or utilities, and other materials which may be encountered within the project limits and are not included in a separate bid item, such as the concrete removal items.
Unclassified excavation shall include the regarding of slopes at a maximum 4:1 slope, except as noted elsewhere on the plans or these specifications.
Excavated and removed materials (including PCC, AC, CMB, CTB, slurry backfill, dirt, ivies, plants, trees, roots, stumps, branches, grass, bricks, fences, woods, etc.) shall be removed from the job site the same day as excavated.
All existing pavement joining new construction shall be sawcut in a straight line.
Contractor shall exercise due caution to avoid any damage to the existing utilities and improvements to be protected in-place. Any damage caused by Contractor and/or his equipment shall be repaired or replaced as called out in Section 7-9,Protection and Restoration of Existing Improvements of the Standard Specifications at Contractor's expense.
It is the Contractor's responsibility to cover all subsurface exploration as required and submit a complete bid covering the cost for exploration and removals to the grades required.
The Contractor shall protect and support existing improvements not designated to be removed adjoining and adjacent new improvements including walls, fences, brick work, PCC, drainage pipes, structures and other improvements.
If, in the opinion of the Engineer, the existing materials of areas beneath the regular excavation depth are unsuitable, and/or contaminated, the Contractor may be ordered to over-excavate those areas to a depth to be determined by the Engineer. A combination of stabilization fabric crushed miscellaneous base and/or asphalt concrete shall be used to replace materials over-excavated as directed by the Engineer.
The Contractor shall contact Transportation Services at (714) 754-5184 two (2) days prior to any excavation work that would damage traffic signal loops, for adjustments to the 881
Project and Specification No. 25-10
State Funded Project No. CRASL-5312 (106)
SP-20
signal timing.
300-2.1 GENERAL - Add
the following:
Unclassified excavation shall consist of all excavation, including roadways, bituminous pavement, macadam, P.C.C. concrete pavement, aggregate base materials, Petromat or pavement reinforcing fabric, steel or welded wire mesh reinforcement, native materials, abandoned concrete or steel culverts or other utilities, brick, concrete or other miscellaneous pavers, cement or lime treated base materials, and other miscellaneous improvements within the roadway section.
All roots and stumps shall be removed and/or ground to eight (8) inches below subgrade within the roadway section. The locations and dimensions of excavation areas are as shown on the plans and/or directed in the field by the Engineer.
Saw cutting of edges of bituminous pavement or P.C.C. improvements to be joined is required prior to final paving, restorations and repairs, unless otherwise directed by the Engineer.
The asphalt pavement shall be sawcut and removed to clean, straight lines at the designated lines of removal marked in the field or as designated by the Engineer.
Contractor shall exercise due caution to avoid any damage to the existing improvements to be protected in place. Any damage caused by Contractor and/or his equipment shall be repaired or replaced as called out in Section 400 of the Standard Specifications at Contractors expense.
Saw cuts along removal limits shall be to a minimum depth as shown on plans. All excavated materials shall become the property of the Contractor and shall be disposed of at a suitable and legal disposal site. Arrangements for such disposal sites shall be made by the Contractor and approved by the Citys representative, when such areas are within the City right-of-way.
Unclassified excavation shall include the removal of unclassified fill material encountered within the proposed roadway section. Unclassified fill may consist of broken concrete, broken asphalt pavement, brick, rubble, and debris.
All unclassified fill material found within the new roadway section shall be removed and paid in accordance with the bid item #9, as authorized by the Engineer. If the unclassified fill material is encountered within the subgrade preparation area, the removal of said unclassified excavation shall be paid for at the unit price for bid item #9, as authorized by the Engineer.
All removed material becomes the property of the Contractor and shall be hauled away and properly disposed.
The Contractors attention is directed to the fact the thickness of the existing asphalt concrete pavement is approximate and may vary from this thickness. In addition, substantially thicker sections of pavement may be occasionally encountered, especially where utility trench, pothole and past localized 882
Project and Specification No. 25-10
State Funded Project No. CRASL-5312 (106)
SP-21
reconstruction patches are encountered.
If a significantdeviatio
n in pavement thickness is encountered by the contractor during the removal process, that may significantly impact the Contractors cost of removal, the Contractor shall immediately notify the Engineer. The Engineer will review the field condition(s) encountered and determine the appropriate remediation. The Engineer shall have sole authority to decide the method and amount of additional compensation due the Contractor, if any.
Unless directed by the Engineer, backfilling and compacting is considered included in each respective bid item and no additional compensation will be allowed therefore. 300-2.1.1 REQUIREMENTS - Subsection 300-2.1.1 is hereby added to Section 300 of the Standard Specifications as follows:
Concrete shall be removed to neatly sawed edges with saw cuts made to a minimum depth of 1-1/2 inches. Concrete pavement shall be removed to neatly sawed straight lines either parallel to the curb or at right angles to the curb face. If the saw cut in concrete pavement fall within 3 feet of a construction joint, expansion joint, or edge, the concrete shall be removed to the joint or edge. Curb and gutter shall be sawed to a depth of 1-1/2 inches on a neat line at right angles to the curb face. All concrete removal shall be sawcut at the required dimension.
300-2.9 PAYMENT - The first sentence of Subsection 300-2.9 of the Standard Specifica- tions is hereby deleted and replaced with the following:
Full compensation for the requirements of unclassified excavation will be measured and paid for at as depicted in Part 1 of these Special Provisions. 300-4 UNCLASSIFIED FILL
300-4.10 MEASUREMENT AND PAYMENT - Subsection 300-4.10 of the Standard Specifications is hereby deleted in its entirety and replaced with the following:
SECTION 301 SUBGRADE PREPARATION, TREATED MATERIALS, AND
PLACEMENT OF BASE MATERIALS
301-1 SUBGRADE PREPARATION
301-1.3 RELATIVE COMPACTION - The first paragraph of Subsection 301-1.3 of the Standard Specifications is hereby deleted and replaced with the following:
When pavement is to be placed directly on subgrade material or when base or subbase material, curb, gutter, alley pavement, driveways, access ramps or sidewalks are to be placed on the subgrade material, the top 6 inches of such subgrade material shall be compacted to arelative compaction of 95 percent.
883
Project and Specification No. 25-10
State Funded Project No. CRASL-5312 (106)
SP-22
301-2 UNTREATED BASE
301-2.4 MEASUREMENT
AND PAYMENT
Delete the text of this subsection of the Standard Specifications entirely and replace with the following:
Payment for Crushed Miscellaneous Base under sidewalks, curb and gutter, curb ramps, driveways, bus pads, cross gutter, convenience strip and other miscellaneous PCC improvements, shall be considered as included in the unit price bid for the various items of work involved, as described in Part 1 of these Special Provisions. No additional compensation will be allowed, therefore.
SECTION 302 ROADWAY SURFACING
302-5 ASPHALT CONCRETE PAVEMENT
[Add the following within each Subsection:].
302-5.1 GENERAL
Asphalt Concrete (AC) shall conform to Standard Specifications for Public Works Construction Section 203-6, with Section 92, "Asphalt" of Caltrans Standard Specifications and Special Provisions, and as modified herein. • AC base course shall be Type III-B2-PG-64-10(3/4 sieve size). • AC leveling course (if applicable) shall be Type III-C3-PG-64-10(1/2 sieve size) (up to 0.10 foot thick). Unless otherwise directed by the ENGINEER, the finished surface of the new leveling course shall be 0.10-foot-thick measured from the top of milled surface to top of compacted leveling course at the center/crown of roadway.
All areas for reconstruction and leveling shall be marked in the field by the ENGINEER.
The Contractor is not allowed to drive his/her fully loaded trucks on the new asphalt concrete mat.
Contractor shall protect and preserve the entire existing pavement outside construction limits in the same condition as existing. Contractor shall replace and/or repair the damaged area to the satisfaction of the Engineer at no cost to the City.
The Contractor shall remove the existing AC pavement section and the subgrade down to the elevation as depicted on the Plans. All work shall comply with the applicable sections of the Standard Specifications as required.
Sub-grade preparation shall conform to Standard Specifications for Public Works Construction Section 301-1.
Unless otherwise directed by the ENGINEER, the finished surface of the new leveling 884
Project and Specification No. 25-10
State Funded Project No. CRASL-5312 (106)
SP-23
course shall be 2-inches thick at the center/crown of roadway, tapering to 0 inches thick approximately one foot from the edge of the gutter lip.
The Contractor shall
remove the native subgrade and install and compact the new aggregate base section to the required elevation as specified on the Plans. The aggregate base material shall be¾ CMB and conform to Standard Specifications for Public Works Construction Section 200-2.4Crushed Miscellaneous Base.
The existing AC pavement shall be saw-cut to full depth to provide a clean, neat, and straight pavement break. Then the join between the existing pavement and the new pavement shall be sealed. A layer of tack coat shall be applied to all vertical-cut faces and between subsequent HMA lifts.
All excavated material shall be hauled and disposed of by the Contractor in accordance with these Special Provision and Standard Specifications.
The Contractor can elect to bring the entire AC Base Course to the existing finished grade prior to cold milling operations.
Prior to placing asphalt concrete, all existing surfaces shall be cleaned by blowing air, water and/or broom, and the crack seal applied as part of the cold milling operation shall be set and inspected. The surface shall be free of water, dust, and all foreign materials before any tack coat is applied.
The Tack Coat shall be applied to all exposed surfaces.
Unless otherwise directed by the ENGINEER, the finished surface of the new leveling course shall be 2-inches thick at the center/crown of roadway, tapering to 0 inches thick approximately one foot from the edge of the gutter lip.
Finished surface of the new pavement shall be flush with the edge of the gutter, if there is a bike lane or crosswalk with curb ramps (A.D.A. path of travel). The finished surface of the new pavement shall be3/8 higher than the edge of the gutter for all other conditions.
The Contractor shall be responsible for maintaining location of and access to, all water valves, water line gate valves and manholes during construction.
Contractor shall schedule paving operations to ensure that construction equipment does not drive over new A.C. material.
At least 24 hours ofcool off time shall occur between A.C. lifts.
Contractor shall protect and preserve the entire existing pavement outside construction limits in the same condition as existing. Contractor shall replace and/or repair the damaged area to the satisfaction of the ENGINEER at no cost to the City.
Unless otherwise noted below, there are no special equipment requirements, the contractor shall comply with all provisions of the latest edition of the Standard Specifications for Public Works Construction.
885
Project and Specification No. 25-10
State Funded Project No. CRASL-5312 (106)
SP-24
302-5.4 TACK COAT
Tack coat shallbe
Grade SS-1h emulsified asphalt applied at a rate of 0.10 gallons per square yard shall be uniformly applied to all exposed surfaces of existing pavement, preceding the placement of asphalt concrete leveling or base course.
Prior to placing asphalt concrete, all existing surfaces shall be cleaned by blowing air, water and/or broom, and the crack seal applied as part of the cold milling operation shall be set and inspected. The surface shall be free of water, dust, and all foreign materials before any tack coat is applied.
The Tack Coat shall be applied to all exposed surfaces. 302-5.5 DISTRIBUTION AND SPREADING - The following is hereby added to this subsection:
The Contractor shall provide automatic screed control as directed by Engineer.
Distribution and spreading shall conform to 302-5.5, except that at the time of placement in the paving machine, the temperature of DGAC shall be 290 degrees Fahrenheit and be high enough that pavement temperature after two passes with the breakdown roller exceeds 240 degrees Fahrenheit.
To avoid picking up loose rock in the paving area, the tires of all trucks must be lightly oiled, with linseed oil or soy bean oil or approved equal. Diesel fuel will not be allowed on the project at all for oil down of any equipment.
Contractor shall maintain a functioning infrared heat measurement device in close proximity to each paving machine at all times. Contractor shall provide a pavement temperature reading, with an infrared heat measurement instrument when requested by the Engineer. Inaccessibility of a heat measurement shall be cause for termination of paving operation.
302-5.5.1 SURFACE PREPARATION
Prior to placing asphalt concrete, all existing surfaces shall be cleaned by blowing air, water and/or broom. All striping and markings shall be removed by grinding or by some other approved method before placing asphalt concrete surface course, and skin patching. The surface shall be free of water, dust, and all foreign materials before any tack coat is applied.
Prior to the application of new AC surface course, the Contractor shall locate and tie-out all manholes and valve covers before commencing work.
Asphalt concrete shall be compacted to achieve at least 95 percent of the relative compaction.
The Contractor is not allowed to drive his/her fully loaded trucks on the new asphalt concrete mat.
886
Project and Specification No. 25-10
State Funded Project No. CRASL-5312 (106)
SP-25
302-5.6 ROLLING
Initial or breakdown
compaction shall consist of a minimum of three coverages of a layer of asphalt concrete. A pass shall be a movement of a roller in both directions over the same path.
A coverage shall be as many passes as are necessary to cover the entire width being paved. Overlap between passes during any coverage made to insure compaction without displacement of material, in accordance with good rolling practice, shall be considered a part of the coverage being made and not a part of a subsequent coverage.
Each coverage shall be completed before subsequent coverages are started.
Pneumatic rollers shall not be used without prior approval of the Engineer. The top layer of each lane, once commenced, shall be placed without interruption. The Contractor shall roll the newly laid asphalt concrete in such a manner that will not create a joint between two passes; joints shall be flush. If such joint exists, the Contractor shall be required to replace or repair that section as directed by the Engineer at no cost to the City. Six (6) inches of newly laid asphalt concrete to be joined by an adjacent pass shall not be rolled until adjacent pass has been laid.
Subgrade preparation shall conform to Section 301-1 of the Greenbook, and shall be included in the unit price bid forAsphalt Concrete.
Asphalt concrete shall be placed with a paving machine equipped with a Preco attachment or an approved equal device for use in obtaining constant cross-slope and maximum joint quality.
At all locations where new asphalt concrete pavement is joining or overlaying existing asphalt pavement, the Contractor shall provide straight neat lines and transition the last twenty (20) feet of new pavement to form a smooth transition with the existing pavement.
Contractor shall protect and preserve the entire existing pavement outside construction limits in the same condition as existing. Contractor shall replace and/or repair the damaged area to the satisfaction of the Engineer at no cost to the City.
Rolling along a joint shall be such that the widest part of the roller is on the hot side of the joint.
Rubber tire rollers shall be used on any asphalt concrete leveling course.
Roller drum wheels shall be filled per manufacturer's recommendations. 302-5.7 JOINTS - The following is hereby added to this subsection:
Join lines between successive runs shall be within 6 inches of lane lines or a minimum of 12 feet outside of the outer most lane line.
302-5.8 MANHOLES - The following is hereby added to this subsection:
887
Project and Specification No. 25-10
State Funded Project No. CRASL-5312 (106)
SP-26
Asphalt-Rubber Hot Mix (ARHM) shall be used as final cap around adjusted manholes and valves.
302-5.10
Crack Repair. The following is hereby added to this subsection (if applicable):
After completion of the cold milling operations, cracks ¼ inch and greater shall be cleaned for the entire crack depth using sandblasting, brushing, and air blowing techniques as required to provide a crack free from all debris, dust, loose material and moisture.
Gouging or plowing may be required to remove incompressible debris deep in the crack.
The cleaned crack shall be filled with granulated tire rubber, plasticizer and filler, as manufactured by Crafco as Road Saver 211, or approved equal. All crack filler material shall be in conformance with the following specifications. The crack sealant placed shall be slightly below the pavement surface to avoid over-application and minimize bumps and wicking through the AC surface during compaction. Deep cracks should be filled with sand and covered with a thin layer of sealant.
All holes shall be cleaned of loose materials and filled with Asphalt Concrete Type B PG 70-10 RAP (Max. 10% RAP) and compacted to a smooth even surface with the adjacent existing pavement.
302-9 ASPHALT RUBBER HOT MIX (ARHM)
302-9.1 GENERAL
[Add the following:].
Asphalt Rubberized Hot Mix (ARHM) shall conform to Section 203-11 of the Standard Specifications and as modified herein.
• The Asphalt Rubber Hot Mix Surface Course shall be Gap-Graded ARHM-GG-C- PG 64-16(1/2 sieve size) and at least 0.15 foot thick
All PCC surfaces, to be crossed by trucks used to haul ARHM, that are within 500 feet of the work limits shall be covered with sand or other durable covering prior to applying tack coat.
Contractor shall have sufficient power brooms on site during all periods of distribution and spreading to provide for cleanup of haul routes and work areas. Power broom shall provide miscellaneous cleanup of ARHM spoils as directed by the Engineer.
All raised pavement markers shall be removed prior to the placement of any asphalt concrete overlay.
Power brooms used ahead of paving operations after acceptance of cold milling shall only sweep areas that are accepted as completed for cold milling. Power brooms shall not be operated more than 80 percent full of sweepings. Power brooms that have swept areas not accepted as completed for cold milling shall not enter onto areas that are accepted as completed for cold milling.
888
Project and Specification No. 25-10
State Funded Project No. CRASL-5312 (106)
SP-27
Finished surface of the new pavement shall be flush with the edge of the gutter for entire project area.
Contractor shall
schedule paving operations to ensure that construction equipment does not drive over new AC material.
The Contractor is not allowed to drive his/her fully loaded trucks on the new ARHM mat.
Contractor shall protect and preserve the entire existing pavement outside construction limits in the same condition as existing. Contractor shall replace and/or repair the damaged area to the satisfaction of the ENGINEER at no cost to the City.
Unless otherwise specified herein, there are no special equipment requirements to perform the work and the contractor shall comply with all equipment specifications of the Standard Specifications.
302-9.2 Tack Coat. The first sentence in subsection 302-5.4 of the Standard Specifications is hereby deleted and replaced with the following:
Tack coat shall be Grade SS-1h emulsified asphalt applied at a rate of 0.10 gallons per square yard shall be uniformly applied to all exposed surfaces of existing pavement, preceding the placement of ARHM surface course.
Prior to placing the ARHM surface course, all receiving surfaces shall be cleaned by blowing air, water and/or broom. The surface shall be free of water, dust, and all foreign materials before any tack coat is applied.
The Tack Coat shall be applied to all exposed surfaces. 302-9.3 DISTRIBUTION AND SPREADING
Distribution and spreading shall conform to 302-5.5, except that at the time of placement in the paving machine, the temperature of ARHM-GG shall be 290 degrees Fahrenheit and be high enough that pavement temperature after two passes with the breakdown roller exceeds 240 degrees Fahrenheit.
To avoid picking up loose rock in the overlay area, the tires of all trucks must be lightly oiled, with linseed oil or soy bean oil or approved equal. Diesel fuel will not be allowed on the project at all for oil down of any equipment.
Contractor shall maintain a functioning infrared heat measurement device in close proximity to each paving machine at all times. Contractor shall provide a pavement temperature reading, with an infrared heat measurement instrument, when requested by the Engineer.Inaccessibility of a heat measurement shall be cause for termination of paving operation.
At least 24 hours ofcool off time shall occur between A.C. lifts. 889
Project and Specification No. 25-10
State Funded Project No. CRASL-5312 (106)
SP-28
All temporary striping and markings shall be removed by grinding or by some other approved method before placing asphaltco
ncrete surface course, and skin patching.
Asphalt concrete shall be placed with a paving machine equipped with a Preco attachment or similar device for use in obtaining constant cross-slope and maximum joint quality.
302-9.4 ROLLING - The second sentence of Subsection 302-9.4 is hereby deleted and replaced with the following:
Two complete passes with the breakdown roller shall be provided. Initial breakdown rolling shall be performed close enough to the paving machine and at a pavement temperature high enough such that the pavement temperature after two passes exceeds 240 degrees Fahrenheit.
To ensure optimum quality control, the use of more than one paver must be approved in advance by the Engineer, and will generally require one foreman, one sweeper, and a full complement of rollers per Subsection 302-5.6 of the Standard Specifications, and this Subsection 302-9.5 for each paving machine. An extra breakdown roller shall be on site at all times, free of defects.
A vibratory roller shall be used for initial breakdown rolling. The vibratory roller for initial breakdown rolling and all other rollers shall have an adjustable range of vibration set at low vibration.
Intermediate rolling shall be provided such that a total of six passes are performed before pavement temperature drops below 200 degrees Fahrenheit.
A finish roller shall be provided in addition to intermediate rolling.
Initial or breakdown compaction shall consist of a minimum of three coverages of a layer of asphalt concrete. A pass shall be a movement of a roller in both directions over the same path.
A coverage shall be as many passes as are necessary to cover the entire width being paved. Overlap between passes during any coverage made to insure compaction without displacement of material, in accordance with good rolling practice, shall be considered a part of the coverage being made and not a part of a subsequent coverage.
Each coverage shall be completed before subsequent coverages are started.
The top layer of each lane, once commenced, shall be placed without interruption. The Contractor shall roll the newly laid asphalt concrete in such a manner that will not create a joint between two passes; joints shall be flush. If such joint exists, the Contractor shall be required to replace or repair that section as directed by the Engineer at no cost to the City. Six (6) inches of newly laid asphalt concrete to be joined by an adjacent pass shall not be rolled until adjacent pass has been laid.
Pneumatic rollersshall not be used without prior approval of the ENGINEER. 890
Project and Specification No. 25-10
State Funded Project No. CRASL-5312 (106)
SP-29
302-9.6 MANHOLES (AND OTHER STRUCTURES) [Add the following:] The Contractor shall
be responsible for maintaining location of and access to, all water valves, water line gate valves and manholes during construction.
Prior to the application of new AC surface course, the Contractor shall locate and tie-out all manholes and valve covers before commencing work and comply with these Special Provisions.
The Contractor is directed to Section 403 within these Special Provisions with respect to raising, adjusting or reconstructing utilities to grade. 302-9.7 Rock Dust Blotter. Subsection 302-9.7 of the Standard Specifications is hereby deleted and replaced with the following:
Rock dust blotter material shall be required immediately after the completions of the finish rolling and prior to opening to traffic to prevent bleeding and tracking of the asphalt rubber material.
Lack of uniformity of application of rock dust shall be cause to terminate paving operations.
Rock dust blotter conforming to 200-1.2 shall be uniformly applied using a mechanical spreader at a rate of 3 pounds per square yard regardless of the pavement temperature, to prevent tracking of the ARHM.
24 hours after paving, the Contractor shall hand sweep all sidewalks, driveways, curbs, gutters, and access ramps; and shall mechanically sweep all roadway surfaces. The mechanical sweeper shall be self-propelled mobile sweeper. Payment for the sweeping shall be included in the lump-sum price bid for SWPPP and no additional compensation will be allowed therefore.
302-9.5 JOINTS
At all locations where new asphalt concrete pavement is joining or overlaying existing asphalt pavement, the Contractor shall provide straight neat lines and transition the last twenty (20) feet of new pavement to form a smooth transition with the existing pavement.
SECTION 303 CONCRETE AND MASONRY CONSTRUCTION
303-5 CONCRETE CURBS, WALKS, GUTTERS, CROSS GUTTERS, ALLEY
INTERSECTIONS, ACCESS RAMPS, AND DRIVEWAYS
303-5.1 REQUIREMENTS
303-5.1.1 GENERAL
[Replace the entire Subsection with the following:].
891
Project and Specification No. 25-10
State Funded Project No. CRASL-5312 (106)
SP-30
Concrete curbs, walks, gutters, spandrels, cross gutters, alley intersections, access ramps, and drivewayssh
all be constructed of Portland cement concrete and comply with Section 201-1 of the Standard Specifications. The following class of concrete shall be used per each type of improvement:
• Curb and Gutter, Spandrels, Cross Gutters, Alley Intersections, Sidewalks, Access Ramps and Driveways, etc. 560-C-3250.
The following AC type and Crushed Miscellaneous Base (CMB) shall be used with respect to each type of improvement:
• Asphalt Concrete Base Course shall conform to Section 302-5 of these Special Provisions.
• Crushed Miscellaneous Base (CMB) shall be¾ fine and comply with Section 200-
2.4 of the Standard Specifications.
• AC Sidewalk Surface Course (Type III-C3-PG64-10 (½ sieve size)) in conformance with Section 203-6 of the Standard Specifications.
Curing compound shall be applied in accordance with the provisions of the GREENBOOK.
CITY Standard Drawings
The following CITY Standard Drawings shall apply or per the direction of the ENGINEER:
• Curb and Gutter shall conform to Nos. 312 and 314.
• Concrete Sidewalk shall conform to Nos. 411, 412, and 413, (and 414 where necessary). 4 Min PCC/4 CMB.
• Driveways shall conform to Nos. 313, 513, and 514.
• Cross-gutters shall conform to No. 415 or per Standard Plan No. 122-2 or 123-2 in the Standard Plans for Public Works Construction, also known as the A.P.W.A.
Standard Plans.
Caltrans Standard Plans
The following Caltrans Standard Plans shall apply:
• Americans with Disabilities Act (ADA) Access Ramps - Construction shall conform to Caltrans Standard Drawing No. A88A adjusted to meet the latest ADA regulations and requirements. The width of the wheel chair access rampW shall be a minimum of five(5) foot wide.
303-5.1.1 a) ADA ACCESS RAMPS
The Contractor shall inspect the location of the Access Ramps to be re-constructed prior to beginning the work to determine the appropriate Caltrans Standard Plan Ramp Case to be constructed. If the work entails removing and replacement of existing concrete 892
Project and Specification No. 25-10
State Funded Project No. CRASL-5312 (106)
SP-31
sidewalk outside the ramp work limit area as identified in these Specifications or as shown on the Plans, he/sh
e shall notify the ENGINEER prior to initiating the work.
The Contractor shall construct all necessary variable height-retaining curb at the back of the curb ramp as well as other retaining curb, if required, pursuant to the appropriate Caltrans Standard Plan ADA Ramp Case as determined by the Contractor and accepted by the ENGINEER. The Contractor shall relocate all street signs effected by the ramp construction to a condition equal to or better than existing.
The detectable warning surface shall be Armor-Tile replaceable truncated domes or approved equal. Contractor shall submit a sample of the detectable warning surface to the ENGINEER for approval, prior to the start of construction. The color shall beyellow.
The truncated dome mat shall be installed across the entire width of the bottom of the access ramp and shall
be installed per the manufacturer's installation recommendations, or as directed by the ENGINEER.
The Contractor shall ensure safe passage by pedestrians during the ADA ramp construction and afford one safe crossing of the street at all times. The Contractor shall set-up all required signage and barricades within the work zone to provide safe pedestrian passage.
AC Tie-in
The Contractor shallsaw
cut, remove, and reconstruct a minimum of a two (2) foot width (slot patch) of adjoining structural section of the pavement to the limits of the ADA Ramp construction (BCR joint to ECR joint). The AC structural section to be replaced shall be 8 AC BaseCourse/8 CMB or12 full depth AC Base Course with compaction as required by the Standard Specifications.
If there is an asphalt concrete adjoining sidewalk to be reconstructed to tie into the new concrete ramp, a one-foot(1) adjoining pavement section shall be removed and replaced with a structural section of 4 AC SurfaceCourse/4 CMB.
Curb and Gutter
The Contractor shall sawcut and remove existing curb and gutter, and construct either Type"C-6 curb and
gutter or "C-8" curb and gutter pursuant to the existing curb and gutter condition conforming to the CITY Standard Drawing No. 312, rolled curb and gutter and/or modified curb and gutter at locations marked in the field by the ENGINEER or as designed on the Plans.
SPECIAL NOTE: In order to comply with ADA requirements cross slope of gutter plate and AC at wheelchair ramp locations shall not exceed 5% grade in the gutter pan.
SPECIAL NOTE: Curing compound shall be applied in accordance with the provisions of the GREENBOOK.
893
Project and Specification No. 25-10
State Funded Project No. CRASL-5312 (106)
SP-32
Removal of the Concrete Curb and Gutter and AC shall conform to Section 401Removal of the Standard Specifications.
Existing Landscape
Areas
All existing landscaping/irrigation/backfill removed, as part of the access ramp construction shall be
replaced in-kind and made a part of the work in conformance with these Special Provisions and Standard Specifications at no additional cost to the CITY.
Other Existing Facilities and Obstructions (e.g., Bus Pads) The Contractor shall protect all existing improvements within the work area not designated to be re
moved in-place and intact and shall replace any existing improvements damaged by his/her operations at no additional cost to the CITY.
The Contractor shall locate and protect the traffic signal home-run within the slot patch and ramp area and coordinate with the City with respect to the signal loop replacement work as shown on the plans or as required. If the Contractor damages the existing signal loop conductor/conduit or other wiring to the signal pull box, all damage to said existing improvements shall be repaired/replaced to an in-kind condition pursuant to the required specifications and the system shall be restored for full operation at no cost to the City.
The Contractor shall mark, protect, adjust, and re-set all utility boxes/vaults within the reconstructed area. Additionally, the Contractor shall replace any existing marked, labeled or stamped concrete on the face of curb of existing utilities, which include, but not limited, to water, sewer, gas, etc.
303-5.1.1 b) CURB AND GUTTER
Per CITY Standards, weakened plane joints are required every ten feet(10) and felt paper every forty feet(40). Transitional curb and gutter shall be ten feet(10) from one type to the other. No construction joints will be permitted. 303-5.1.1 c) CONCRETE SIDEWALK
The Contractor shall reconstruct existing concrete sidewalk and/or construct new concrete sidewalk around obstructions, meandering sidewalk, and other miscellaneous concrete construction conforming to these Special Provisions and as shown on the Plans.
The Contractor may be directed to reconstruct concrete walkways within private properties in order to join new improvements. Prior to initiating the work outside the City rights-of-way, the City will obtain the necessary right of access documents from the private property owner.
If there is an asphalt concrete adjoining sidewalk to be reconstructed to tie into the new concrete sidewalk, a one-foot(1) adjoining pavement section shall be removed and replaced with a structural section of4 AC Surface Course/4 CMB. 894
Project and Specification No. 25-10
State Funded Project No. CRASL-5312 (106)
SP-33
The Contractor shall inspect the location of the concrete sidewalk work area to be re- constructed prior tobegi
nning the work. If the work entails removing and replacement of existing concrete sidewalk outside the work limit area as depicted within these Specifications or as shown on the Plans, he/she shall notify the ENGINEER prior to initiating the work.
Existing Landscape Areas
All existing landscaping/irrigation/backfill removed as part of the concrete walkway construction shall be
replaced in-kind and made a part of the work in conformance with these Special Provisions, Standard Specifications, and as directed by the ENGINEER at no additional cost to the CITY.
The Contractor shall place new sod or seed and top soil to match the existing grass species in the areas adjoining the newly constructed concrete improvements that were disturbed by his/her operations. The Contractor may be directed by the ENGINEER to sod or seed other areas as necessary in conformance with these Specifications.
Top Soil shall be Modified Class "A" Topsoil and shall consist of 80% content of Class "A" Topsoil per the Standard Specifications and 20% content of processed wood product of type "I" organic soil amendment per the Standard Specifications.
The Contractor shall protect all existing improvements within the work area not designated to be removed in-place and intact and shall replace any existing improvements damaged by his/her operations. Any damage beyond the construction limit shall be repaired at the Contractor's expense per Section 400-1 of the Standard Specifications.
The Contractor shall protect and support existing irrigation lines and sprinkler heads in place and intact. The Contractor shall adjust the heads to the proper level upon completion of the new sidewalk replacement.
The Contractor shall furnish and install all new pipe sizes to match existing, but no less than ½ schedule 40, PVC pipe, to tie into existing pipes. New sprinkler heads shall be equal to or better than existing inclusive of all appurtenances. All work shall conform to the applicable sections of the Standard Specifications and as directed by the ENGINEER.
The Contractor may salvage and reuse sprinkler heads that are still in reusable and functional condition for use at locations from which they were removed.
The Contractor shall cut interfering portions of existing irrigation lines and cap all ends for future reconnection at the time that the work is started at each location. All repair and replacement of the irrigation system shall be done within five (5) days or sooner after disconnection. During disconnection period of existing irrigation systems, the Contractor shall maintain the existing grass, trees, shrubs, and other existing landscape in a live condition with a temporary irrigation system and/or shall water the landscaped areas by hand. Homeowner's water supply shall not be used without written consent from each homeowner.
895
Project and Specification No. 25-10
State Funded Project No. CRASL-5312 (106)
SP-34
The Contractor shall modify, relocate or replace and/or extend all encountered irrigation lines orsprinkler
heads so as to give full coverage to landscape area.
The Contractor may be directed to extend the existing sprinkler system or place a P.V.C. sleeve under the new sidewalk improvements into the landscaped area between the curb and sidewalk and other locations as necessary as determined in the field by the ENGINEER.
Prior to accepting work, the Contractor must turn the system on, and it must work properly in the presence of and to the satisfaction of the Engineer and property owner. The Contractor shall replace any damaged and dead grass or landscaping beyond construction limits resulting fromContractors operation or insufficient water supplies at no cost to the CITY.
Other Existing Facilities and Obstructions
Contractor shall adjust to grade existing water meter boxes (WM) to the new grade of the sidewalk. Thew
ater meter and water line shall be protected in place. Broken water meter boxes shall be removed and replaced by the Contractor, contact Mesa Water District to obtain and pickup new WM box. WM box shall be furnished to the Contractor at no cost.
The Contractor shall protect in-place the existing mail boxes or relocate them if they do not meet U.S. Post Office standards (see the Standard Plans section, if applicable). The Contractor shall provide a new post in case the existing one cannot be saved as determined by the ENGINEER in the field.
The Contractor shall relocate any street signs, which interfere, or conflict with construction of the sidewalk. A minimum 4-foot wide path of travel shall be required.
Sidewalk obstruction flare construction shall be per City Standard Drawing No. 413 or as shown on the Plans or as depicted within these Specifications.
At certain addresses, the Contractor will be directed to remove concrete and/or other improvements in the right-of-way. Upon the completion of the removal of existing concrete improvements within the parkway, including the underlying aggregate base for which no replacement is required, the Contractor shall backfill the void with Modified Class "A" Topsoil for placing new sod or seed as directed in those respective bid items. 303-5.1.1 d) CONCRETE CROSS-GUTTER
Contractor shall sawcut and remove existing improvements and reconstruct cross-gutter conforming to City of Costa Mesa Standard Drawing No. 415 or per Standard Plan No. 122-2 or 123-2 in theStandard Plans for Public WorksConstruction, also known as the A.P.W.A. Standard Plans, and applicable sections of the Standard Specifications, as directed by the ENGINEER.
Eight (8) inches of Crushed Miscellaneous Base (CMB) shall be required under all new cross gutters.
896
Project and Specification No. 25-10
State Funded Project No. CRASL-5312 (106)
SP-35
Concrete shall be class 560-C-3250. (High early strength concrete mix) Crushed Miscellaneousbase
material and construction shall conform to Subsections 200 and 301 of the TheGreenbook, and as directed by the Engineer. The sieve size shall be ¾ (fine).
New improvements shall be constructed to grades as indicated on the plans to provide a proper flow line with the existing improvements as indicated on the plans. 303-5.1.1 e) CONCRETE DRIVEWAY APPROACH
Contractor shall sawcut and remove existing improvements and construct P.C.C.
Driveway Approach per City of Costa Mesa Standard Drawing Nos. 313, 513, and 514 and also to Standard Plan No. 110-2, TypeB in theStandard Plans for Public Works Construction, also known as the A.P.W.A. Standard Plans. All work shall conform to the applicable portions of Section 303-5 of the Standard Specifications. Six (6) inches of Crushed Miscellaneous Base (CMB) shall be required under all new driveways.
The Contractor shall adjust all existing utility boxes and conduit, or water meter boxes within the new driveway approach, to its new finished grade, and the adjustment shall be included in the bid price per square foot of Residential Driveway or Commercial Driveway.
Removals and/or relocations necessary for driveway construction are to be paid as part of this bid item, except where a separate bid item exists for a stated removal or relocation item of work.
Concrete shall be class 560-C-3250.
Crushed Miscellaneous base material and construction shall conform to Subsections 200 and 301 of the TheGreenbook, and as directed by the ENGINEER. The sieve size shall be ¾ (fine).
If there is existing asphalt concrete adjoining into the new concrete driveway approach, a one-foot (1) adjoining pavement section shall be removed and replaced with a structural section of6 AC Surface Course/6 CMB.
Asphalt concrete for slot paving shall be¾ for base course and½ for surface course, which is covered in Section 400-4 of Standard Specifications (latest edition).
Soils and aggregate tests shall conform to State of California test methods which may be substituted for designated ASTM test methods as noted herein. Laboratory maximum density tests shall be per Method 2 of Subsection 211-2.1. The correction for oversize materials as stated in Test Method No. California 216 shall be replaced with Note 2 of ASTM D1557.
New improvements shall be constructed to grades as indicated on the plans to match existing improvements and field condition with proper grade to form a safe and smooth riding surface.
It will be the responsibility of the Contractor to complete all initiated repairs by the end of the Friday of each working week unless specified otherwise by the City Engineer.
897
Project and Specification No. 25-10
State Funded Project No. CRASL-5312 (106)
SP-36
303-5.7 Repairs and Replacements.
All work which
is defective in its construction or deficient in any of the requirements of these Special Provisions shall be remedied, or removed and replaced by the Contractor in a manner acceptable to the City and no compensation will be allowed for such correction.
The minimum length for removal and replacement of unsatisfactory work shall be score line to score line for sidewalk. Sawcutting is required for all removals of defective concrete work at no additional cost.
Upon failure on the part of the Contractor to comply forthwith with any order the City makes under the provisions of this Section, the City shall have authority to cause defective work to be removed and replaced and deduct the costs thereof from any monies due or to become due the Contractor.
303.5-8 Backfilling and Cleanup.
The construction of any improvement in place shall mean that in addition to the requirements under Section 303-5.8 of the Standard Specifications relating toBackfilling and Clean up, the Contractor shall be responsible for backfilling the area excavated for the purpose of setting forms. Said backfill shall be considered part of the bid price for the various contract items of work, and no further compensation shall be paid therefore. Said backfill shall be done immediately following the removal of forms.
If no new construction is to be placed in the location where concrete has been removed, then the area shall be backfilled and graded to match existing grade.
During all phases of construction, the Contractor shall maintain a clean work site. The contractor shall be responsible for the removal and disposal of all concrete, asphalt, tree roots, and any other debris resulting from the work performed. Full compensation shall be considered as included in the prices for the various items.
Bid Item No. 4: Unclassified Excavation
Unclassified excavation shall conform to all Sections 300-1Clearing and Grubbing, 300- 2, Unclassified Excavation and
300-4 Unclassified Fill of the Standard Specifications and shall consist of all unclassified excavation required to construct the new roadway section, parkway, and offsite improvements in conformance with the line and grades set forth on the plans.
Unclassified excavation shall include removals of the following materials within the project limits to the required subgrade depth: asphalt concrete, aggregate base, native material, cement/lime treated material; slurry backfill; abandoned foundations or utilities, and other materials which may be encountered within the project limits and are not included in a separate bid item, such as the concrete removal items.
Unclassified excavation shall include the regarding of slopes at a maximum 4:1 slope, except as noted elsewhere on the plans or these specifications. 898
Project and Specification No. 25-10
State Funded Project No. CRASL-5312 (106)
SP-37
Excavated and removed materials (including PCC, AC, CMB, CTB, slurry backfill, dirt, ivies, plants, trees,
roots, stumps, branches, grass, bricks, fences, woods, etc.) shall be removed from the job site the same day as excavated.
All existing pavement joining new construction shall be sawcut in a straight line.
Contractor shall exercise due caution to avoid any damage to the existing utilities and improvements to be protected in-place. Any damage caused by Contractor and/or his equipment shall be repaired or replaced as called out in Section 7-9,Protection and Restoration of Existing Improvements of the Standard Specifications at Contractor's expense.
It is the Contractor's responsibility to cover all subsurface exploration as required and submit a complete bid covering the cost for exploration and removals to the grades required.
The Contractor shall protect and support existing improvements not designated to be removed adjoining and adjacent new improvements including walls, fences, brick work, PCC, drainage pipes, structures and other improvements.
If, in the opinion of the Engineer, the existing materials of areas beneath the regular excavation depth are unsuitable, and/or contaminated, the Contractor may be ordered to over-excavate those areas to a depth to be determined by the Engineer. A combination of stabilization fabric crushed miscellaneous base and/or asphalt concrete shall be used to replace materials over-excavated as directed by the Engineer.
The Contractor shall contact Transportation Services at (714) 754-5184 two (2) days prior to any excavation work that would damage traffic signal loops, for adjustments to the signal timing.
Measurement and Payment for all the preceding shall be at the unit price bid per cubic yard (CY) price. This item includes all sawcut, removal and disposal of PCC, AC, aggregate base, and native soil including Petromat/pavement reinforcing fabric, macadam, abandoned concrete and/or steel culverts, unsuitable materials, irrigation improvements, plants, root pruning, removal of existing base material and other unclassified excavation necessary to establish the finished subgrade elevations for the improvements, as detailed in the plans. The unit price bid shall include subgrade preparation and compaction; including all labor, tools, material, equipment and incidentals required to complete the work. No further compensation will be allowed. The Unclassified Excavation bid items are a Final Pay quantity and no additional compensation will be allowed. Payment for any over-excavation shall be per Section 3-3Extra Work as modified by theG
eneral Provisions.
Bid Item No. 5: Variable Cold Mill 2
The type of pavement and depth to be cold milled shall be as shown on the Plans or specified in t h
e Special Provisions. The pavement might contain fabric or steel reinforcement within the depth to be cold milled. The surface after cold milling shall be 899
Project and Specification No. 25-10
State Funded Project No. CRASL-5312 (106)
SP-38
uniformly grooved or ridged. The outside lines of the milled pavement shall be neat and uniform.
The Contract
or shall remove existing asphalt concrete overlay or slurry seal material within one foot of the edge of concrete gutters adjacent to any area to be cold milled. The removal procedure and equipment to be used shall be approved by the Engineer.
The milled pavement shall be true to grade and cross section. When the straightedge specified in 302-5.6.2 is laid on the finished surface parallel to the centerline of the roadway, the surface shall not vary from the edge of the straightedge more than 3/8 inch (10 mm) at any point, except at intersections or at changes of grade. Any areas that are not within tolerance shall be brought to grade within one Working Day following initial cold milling.
Cold milling operations shall be performed without damage to the remaining pavement.
Whenever cold milling is adjacent to existing concrete curbs, gutters or pavement, the Contractor shall protect these improvements from damage. Concrete curbs, gutters or pavement damaged during cold milling operations shall be repaired as directed by the Engineer. Replaced sections of concrete curb, gutter or pavement shall be a minimum of 5 feet (1.5 m) in length or to the next joint.
The contractor shall ensure that any cold-milled street is paved within 48 hours of milling. The contractor is solely responsible for implementing all necessary dust mitigation measures. Any claims arising from dust-related issues shall be the sole responsibility of the contractor, who shall defend, indemnify, and hold the City harmless from any such claims, liabilities, or damages.
Milling machines shall be specifically designed and constructed for cold milling of asphalt concrete, concrete,or
composite pavement.
Milling machines shall conform to the following:
a) The cutting drum shall be a minimum of 60 inches (1500 mm) wide, except for those mounted on a skid-steer loader, and shall be equipped with carbide-tipped cutting teeth placed in a variable pattern to produce the desired finish. b) Be self-propelled and capable of removing the pavement to the depth shown on the Plans.
c) Be equipped with a conveyor system that will immediately convey the milled material into a transport vehicle for disposal as specified in the Special Provisions. d) Be capable of spraying water at the cutting drum to minimize dust. e) Be designed so that the operator can observe the milling operation, at all times, without leaving the controls.
f) Be adjustable for slope and depth.
g) Be capable of milling, in one pass, to the maximum depth recommended by the manufacturer without producing fumes or smoke.
Milling machines used for milling to specified elevation shall conform to 404-2.1 and the following:
a) Be equipped with automatic grade controls that reference the existing pavement elevations or independent grade references.
900
Project and Specification No. 25-10
State Funded Project No. CRASL-5312 (106)
SP-39
Milling machines used for profile milling shall conform to 404-2.1 and the following:
a) Be equipped w
ith a minimum 20-foot (6 m) paving ski with spring loaded feet attached to the bottom at not more than 18-inch (0.5 m) increments. The upper portion of the ski shall be one piece and manufactured such that the ski does not flex or bend by more than 3/16 inch (5 mm) when supported off of the surface of the pavement by an attachment located at theskis longitudinal center of gravity.
The grade control system of the milling machine shall be referenced to the center of the ski.
Profile milling is the controlled removal of a portion of the existing pavement to a nominal depth using longitudinal grade controls to remove surface irregularities in the pavement and improve ride ability. The grade shall be as shown on the Plans. During profile milling operations, the center of the ski shall be on a line coincident with the transverse centerline of the milling machines cutting drum. A ski shall be attached to each side of the milling machine cutting drum during the first pass, and on one side of the milling machine on subsequent, adjacent passes with a joint matching grade control on the other side. The resultant milled surface shall not deviate from the grade shown on the Plans, using the straightedge specified in 302-5.6.2, by more than 1/4 inch (6 mm) at any point.
Work site maintenance shall conform to 3-12. A motorized street sweeper shall follow within 50 feet (15 m) of the cold milling machine unless otherwise approved by the Engineer.
Unless otherwise specified, millings shall be considered the property of the Contractor and shall be disposed of off the Work site by the Contractor.
Structures and vertical joints within the cold-milled areas that are transverse to through traffic shall be ramped in conformance with 302-5.7 and 306-1.5.1 temporary asphalt concrete as shown on the Plans or specified in the Special Provisions. Ramps shall be constructed the same day as the existing pavement is cold milled and removed prior to placement of the permanent paving pavement.
Measurement and Payment for the requirements of Variable Cold Mill2 shall be at the contract unit price bid per Square Foot (SF) and will be based on the actual area of surface planed regardless of the number of passes required. The contract price paid per square yard shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for doing all work involved in cold milling the existing A.C., P.C.C., pavement reinforcing fabric/Petromat, macadam, or other miscellaneous improvements, removal of old AC/slurry lip overage from gutter pan, and disposing of material removed, per Typical Sections and Details shown on Plans, , as specified in these special provisions and as directed by the Engineer.The quantity to be paid for will be the actual area of surface cold planed, irrespective of number for passes required to obtain the depth shown on the plans No additional compensation will be allowed, therefore.
Bid Item No. 6: AC Pavement
Asphalt Concrete (AC) shall conform to Standard Specifications for Public Works 901
Project and Specification No. 25-10
State Funded Project No. CRASL-5312 (106)
SP-40
Construction Section 203-6, with Section 92, "Asphalt" of Caltrans Standard Specifications and
Special Provisions, and as modified herein.
• AC base course shall be Type III-B2-PG-64-10(3/4 sieve size).
All areas for reconstruction and leveling shall be marked in the field by the ENGINEER.
The Contractor is not allowed to drive his/her fully loaded trucks on the new asphalt concrete mat.
Contractor shall protect and preserve the entire existing pavement outside construction limits in the same condition as existing. Contractor shall replace and/or repair the damaged area to the satisfaction of the Engineer at no cost to the City.
The Contractor shall remove the existing AC pavement section and the subgrade down to the elevation as depicted on the Plans and as directed and authorized by the Engineer.
All work shall comply with the applicable sections of the Standard Specifications as required.
Sub-grade preparation shall conform to Standard Specifications for Public Works Construction Section 301-1.
The Contractor shall remove the native subgrade and install and compact (95% Relative Compaction) the new aggregate base section to the required elevation as specified on the Plans. The aggregate base material shall be¾ CMB and conform to Standard Specifications for Public Works Construction Section 200-2.4Crushed Miscellaneous Base.
The existing AC pavement shall be saw-cut to full depth to provide a clean, neat, and straight pavement break. Then the join between the existing pavement and the new pavement shall be sealed. A layer of tack coat shall be applied to all vertical-cut faces and between subsequent HMA lifts.
All excavated material shall be hauled and disposed of by the Contractor in accordance with these Special Provision and Standard Specifications.
The Contractor can elect to bring the entire AC Base Course to the existing finished grade prior to cold milling operations.
Prior to placing asphalt concrete, all existing surfaces shall be cleaned by blowing air, water and/or broom, and the crack seal applied as part of the cold milling operation shall be set and inspected. The surface shall be free of water, dust, and all foreign materials before any tack coat is applied.
The Tack Coat shall be applied to all exposed surfaces.
Measurement and Payment to constructAC Pavement shall be made at the unit price bid per tonnage (Ton). The unit price bid shall include subgrade preparation, surface preparation, AC Type Specified herein inclusive of the added AC depth to meet existing 902
Project and Specification No. 25-10
State Funded Project No. CRASL-5312 (106)
SP-41
grade before cold milling operations, tack coat, temporary AC tapers, and all labor, material, sawcut
ting, transitioning, hauling, spreading, compacting, grading, equipment, pavement reinforcing fabric (Petromat), abandoned concrete and/or steel culverts, unsuitable materials, irrigation improvements, plants, root pruning, removal of existing base material and other unclassified excavation necessary to establish the finished subgrade elevations for the roadway improvements, as directed by the Engineer, and incidentals required to complete the Work in accordance with these Specifications, as shown on the Plans, and no further compensation will be allowed.This item may or may not be used, and shall not be subject to the SSPWC 25% limitation on quantity changes. No further compensation will be allowed.
Temporary asphalt concrete work where required by the ENGINEER for traffic control or other purposes shall be considered included in the price bid for the various items of work and no further compensation will be allowed.
Bid Item No. 7: Asphalt Rubber Hot Mix (ARHM-G) Surface Course Asphalt Rubberized Hot Mix (ARHM) shall conform to Standard Specifications for Public Works Construction Secti
on 203-11 and as modified herein.
• The Asphalt Rubber Hot Mix Surface Course shall be Gap-Graded ARHM-GG-C- PG 64-16(1/2 sieve size) and at least 2-inches thick.
Finished surface of the new pavement shall be flush with the edge of the gutter for entire project area.
Contractor shall schedule paving operations to ensure that construction equipment does not drive over new AC material.
The Contractor is not allowed to drive his/her fully loaded trucks on the new ARHM mat.
Contractor shall protect and preserve the entire existing pavement outside construction limits in the same condition as existing. Contractor shall replace and/or repair the damaged area to the satisfaction of the ENGINEER at no cost to the City.
Unless otherwise specified herein, there are no special equipment requirements to perform the work, and the contractor shall comply with all equipment specifications of the Standard Specifications.
Tack coat shall be per Standard Specifications for Public Works Construction Section 302-9.2.
Prior to placing the ARHM surface course, all receiving surfaces shall be cleaned by blowing air, water and/or broom. The surface shall be free of water, dust, and all foreign materials before any tack coat is applied.
The Tack Coat shall be applied to all exposed surfaces. 903
Project and Specification No. 25-10
State Funded Project No. CRASL-5312 (106)
SP-42
Distribution and spreading shall be per Standard Specifications for Public Works Construction Section 302-9.3.
At
least 24 hours ofcool off time shall occur between A.C. lifts.
All temporary striping and markings shall be removed by grinding or by some other approved method before placing asphalt concrete surface course, and skin patching.
Asphalt concrete shall be placed with a paving machine equipped with a Preco attachment or similar device for use in obtaining constant cross-slope and maximum joint quality and fed by material transfer vehicle (Roadtec Shuttle Buggy MTV, or similar).
Manhole and other structures within the street section shall be per Standard Specifications for Public Works Construction Section 302-9.6 The Contractor shall be responsible for maintaining location of and access to, all water valves, water line gate valves and manholes during construction.
Prior to the application of new AC surface course, the Contractor shall locate and tie-out all manholes and valve covers before commencing work and comply with these Special Provisions.
The Contractor is directed to Standard Specifications for Public Works Construction Section 403 with respect to raising, adjusting or reconstructing utilities to grade.
Rolling shall be per Standard Specifications for Public Works Construction Section 302-
5.6. Initial or breakdown compaction shall consist of a minimum of three coverages of a layer of asphalt concrete. A pass shall be a movement of a roller in both directions over the same path.
A coverage shall be as many passes as are necessary to cover the entire width being paved. Overlap between passes during any coverage made to ensure compaction without displacement of material, in accordance with good rolling practice, shall be considered a part of the coverage being made and not a part of a subsequent coverage.
Each coverage shall be completed before subsequent coverages are started.
The top layer of each lane, once commenced, shall be placed without interruption. The Contractor shall roll the newly laid asphalt concrete in such a manner that will not create a joint between two passes; joints shall be flush. If such joint exists, the Contractor shall be required to replace or repair that section as directed by the Engineer at no cost to the City. Six (6) inches of newly laid asphalt concrete to be joined by an adjacent pass shall not be rolled until adjacent pass has been laid. Pneumatic rollers shall not be used without prior approval of the ENGINEER.
Joints shall beper
Standard Specifications for Public Works Construction Section 302-
9.5. 904
Project and Specification No. 25-10
State Funded Project No. CRASL-5312 (106)
SP-43
At all locations where new asphalt concrete pavement is joining or overlaying existing asphalt pavement, theCon
tractor shall provide straight neat lines and transition the last twenty (20) feet of new pavement to form a smooth transition with the existing pavement.
Asphalt Material Transfer Device (Shuttle Buggy):
A self‐propelled material transfer device, capable of moving independent of the paver or attached to the paver shall be used when paving all surface asphalt through lanes on collector and arterial streets. The size of the material transfer device shall be suitable for the type of paving operation performed and shall be subject to the approval of the City Engineer. The material transfer device shall be equipped to perform additional mixing of the material, uniformly heat the material, and transfer the material into the paver at a uniform temperature. Paver hopper inserts shall be required when spillage of the Hot Mix Asphalt (HMA) occurs during transfer of the material.
Measurement and payment for Asphalt Rubber Hot Mix (ARHM-G) SurfaceCourse shall be made at the unit price bid per Tonnage (TON), based upon certified weigh master tickets. The unit price bid shall include, surface preparation, ARHM specified herein, tack coat, temporary AC tapers, rock dust blotter, sweeping, and all labor, material, saw cutting, transitioning, hauling, spreading, compacting, grading, equipment and incidentals required to complete the Work in accordance with these Specifications, as shown on the Plans, and no further compensation will be allowed.
Temporary asphalt concrete work where required by the ENGINEER for traffic control or other purposes shall be considered included in the price bid for the various items of work and no additional compensation will be allowed.
Bid Item No. 8: Construct Crushed Miscellaneous Base
Crushed miscellaneous base shall consist of broken and crushed asphalt concrete or Portland cement con
crete and may contain crushed aggregate base or other rock materials.
The material shall be free of any detrimental quantity of deleterious material as defined in Standard Specifications for Public Works Construction Section 200-1.1.
The material retained on the No. 4 (4.75 mm) sieve shall contain no more than 15 percent gravel particles as defined in Standard Specifications for Public Works Construction Section 200-1.3. The material may contain no more than 3 percent brick by weight as determined by California Test 202 modified as follows: Brick material retained on a No. 4 (4.75 mm) sieve shall be identified visually and separated manually. Brick quantification shall be based on total weight of dry sample.
Grading shall be per Standard Specifications for Public Works Construction Section Table 200-2.4.2.
The material shall conform to Standard Specifications for Public Works Construction Section Table 200-2.4.3.
905
Project and Specification No. 25-10
State Funded Project No. CRASL-5312 (106)
SP-44
The Engineer may waive the percentage wear requirements, provided the material has a minimum durabilityo
f 40 in accordance with California Test 229.Untreated base shall be crushed miscellaneous base conforming to 200-2.4, as shown on the Plans or in the Bid.
Base material shall not be crushed at the Work site. Base material shall have a fine gradation.
Measurement and Payment for Construct CMB shall be per the unit price bid per tonnage (Ton) and shall include full compensation for furnishing all labor, materials, tools, equipment, hauling, spreading, compacting, grading, and incidentals for completing all work as required. No additional compensation shall be allowed.
Bid Items Nos. 9, 10, 11, 12, 13, 21, 22, & 23 include CMB in their bid items and are not included in Bid Item No.7 CMB.
Bid Item No. 9: Construct Variable Height PCC Retaining Curb 0 to 8 Over 6 CMB
Concrete improvements shall be in conformance with City of Costa Mesa Standard Drawings, SPPWC StandardDrawi
ngs, details shown on the project plans, and Standard
Specification for Public Works Construction Sections 201,Concrete, Mortar, and Related Materials, 202-1 Brick and 303-5, Concrete Curbs, Walks, Gutters, Cross Gutters, Alley Intersections, Access Ramps, and Driveways.
Subgrade for concrete improvements shall conform to Standard Specification for Public Works Construction Section 301-1Subgrade Preparation. 4-inches of CMB shall be placed under the variable curb Standard Specification for Public Works Construction Subsection 200-2.4Crushed Miscellaneous Base and Section 301-2Untreated Base.
Concrete shall be class 560-C-3250. Forms shall be provided for excavating, backfilling and compacting. Forming work shall conform to Section 303-5.2,Forms and include any removal, replacement, grading, excavation and saw-cutting necessary for curb and gutter construction.
For curb constructed adjacent to existing private landscaping improvements Contractor shall regrade to a slope at 4:1 maximum from the back of curb to meet existing adjacent surface grades, unless otherwise noted on the plans or specifications. Approximate daylight lines are shown on the plans. Low areas required to meet new or existing grades shall be filled; uncontaminated excavation materials may be used at Engineers approval.
Any existing landscaping or irrigation improvements shall be replaced in kind. The grading behind the curb shall be included in the cost of the retaining curb bid item.
Measurement and payment to Construct Variable Height Retaining Curb0 to 8 over 6 CMB, shall be per the unit price bid per lineal foot (LF) of curb and shall include sub- grade preparation, forms, backfilling behind curbs, grading behind curbs, restoring form areas and all other work as required to complete the work. No other compensation will be allowed.
Bid Item No. 10: Construct 8 Curb and Gutter Over 6 CMB 906
Project and Specification No. 25-10
State Funded Project No. CRASL-5312 (106)
SP-45
Concrete improvements shall be in conformance with City of Costa Mesa Standard Drawings, SPPWC StandardDrawin
gs, details shown on the project plans, and Standard
Specification for Public Works Construction Sections 201,Concrete, Mortar, and Related Materials, 202-1 Brick and 303-5, Concrete Curbs, Walks, Gutters, Cross Gutters, Alley Intersections, Access Ramps, and Driveways.
Brick improvements shall be in conformance with Standard Specification for Public Works Construction Sections 202-1Brick and 303-4,Masonry Construction of the Standard Specifications.
Subgrade for concrete improvements shall conform to Standard Specification for Public Works Construction Section 301-1Subgrade Preparation. 4-inches of CMB shall be placed under curb & gutter per Standard Specification for Public Works Construction Subsection 200-2.4Crushed Miscellaneous Base and Section 301-2Untreated Base.
Concrete shall be class 560-C-3250. Forms shall be provided for excavating, backfilling and compacting. Forming work shall conform to Standard Specification for Public Works Construction Section 303-5.2,Forms and include any removal, replacement, grading, excavation and saw-cutting necessary for curb and gutter construction.
For curb constructed adjacent to existing private landscaping improvements Contractor shall regrade to a slope at 4:1 maximum from the back of curb to meet existing adjacent surface grades, unless otherwise noted on the plans or specifications. Approximate daylight lines are shown on the plans. Low areas required to meet new or existing grades shall be filled; uncontaminated excavation materials may be used at Engineers approval.
Any existing landscaping or irrigation improvements shall be replaced in kind. The grading behind the curb shall be included in the cost of the retaining curb bid item.
Measurement and payment to Construct8 Curb and Gutter over6 CMB shall be per the unit price bid per lineal foot (LF) of curb and gutter and shall include sub-grade preparation, forms, backfilling behind curbs, grading behind curbs, restoring form areas and all other work as required to complete the work. New curb and gutter along bus pads shall be included in this bid item. No other compensation will be allowed.
Bid Item No. 11: Construct 4 PCC Sidewalk Over 4 CMB
Concrete improvements shall be in conformance with City of Costa Mesa Standard Drawings, SPPWC Standard
Drawings, details shown on the project plans, and Standard Specification for Public Works Construction Sections 201,Concrete, Mortar, and Related Materials, 302-6 Portland Cement Concrete Pavement and 303-5,Concrete Curbs, Walks, Gutters, Cross Gutters, Alley Intersections, Access Ramps, and Driveways. In addition, stamped and color concrete shall be in conformance with Standard Specification for Public Works Construction Sections 303-6Stamped Concrete and 303-7Colored Concrete. Concrete shall be class 560-C-3250.
Subgrade for concrete improvements shall conform to Standard Specification for Public Works Construction Section 301-1Subgrade Preparation. 4-inches of CMB shall be placed under sidewalks, ramps, median concrete, and staircases. 6-inches of CMB shall be placed under driveways and offsite concrete pavement. 12-inches of CMB shall be 907
Project and Specification No. 25-10
State Funded Project No. CRASL-5312 (106)
SP-46
placed under bus turnout. CMB shall be placed per Standard Specification for Public Works Construction Se ct
ions 200-2.4 Crushed Miscellaneous Base and 301-2
Untreated Base.