1 CITY OF COSTA MESA

PUBLIC WORKS AGREEMENT FOR
CITY PROJECT NO. 25-07
THIS PUBLIC WORKS AGREEMENT (“Ag reement”), dated October 21, 2025 (“Effective Date”), is made by the CITY OF COSTA MESA, a political subdivision of the State of California (“CITY”), and EL EGANT CONSTRUCTION, INC., a California corporation (“CONTRACTOR”).

WHEREAS, CITY desires to construct the public improvements described below under Paragraph 1, Scope of Work (the “Project”); and
WHEREAS, CITY has determi ned that CONTRACTOR is t he lowest responsible bidder; and
WHEREAS, CITY now desires to con tract with CONTRACTOR to furnish construction and related services for the Project; and
WHEREAS, CITY and CONTRACT OR desire to set forth their rights, duties and liabilities in connection with the services to be performed.

NOW, THEREFORE, for and in considerat ion of the covenants and conditions contained herein, the parties hereby agree as follows:

1. SCOPE OF WORK.

The scope of work generally consists of all mobilization; demolition of existing improvements; rough grading; construction it ems including concrete paving, pavers, concrete curbs, custom fencing, play ar ea safety surfacing, and decomposed granite surfacing; installation of new play equipmen t, new pre-fabricated shade shelters, new picnic tables, new drinking fountains, concrete sculptures; relocation and installation of benches, drinking fountains, backflow prevente r; installation of a new irrigation system; installation of new planting, and any other work required by the contract documents (the “Work”).

The Work is further described in the “Contract Documents” referred to below.

The Project is known as the Ketchum-Libol t Park Expansion Project, City Project No. 25-07 (the “Project”).

2. CONTRACT DOCUMENTS.

The complete Agreement consists of the following documents relating to the Project:

ATTACHMENT 2
Project and Specification No. 25-07
2 (a) This Agreement;
(b) CONTRACTOR’s bid, attached hereto as Exhibit A and incorporated herein; (c) Bid package, including, but not limit ed to, addenda (one to three) to bid package, notice inviting bids, State of California – Natural Resources Agency Department of Parks and Recreation Grant Contract, complete plans, profiles, detailed drawings and specifications, general provisions and special provisions. The bid package is attached hereto as Exhibit B and incorporated herein;
(d) Faithful Performance Bond and Labor and Material Bond, including agent’s Power of Attorney for each bond, attached hereto as Exhibit C; (e) Drug-Free Workplace Policy, attac hed hereto as Exhibit D and incorporated herein; and
(f) Provisions of the most curre nt edition of The Greenbook: Standard Specifications for Public Works Construction (“The Greenbook”). Provisions of The Greenbook are incorporated by this reference as if fully set forth herein.

The documents comprising the complete Agreement will be referred to as the “Contract Documents.”
All of the Contract Documents are intended to comple ment one another, so that any Work called for in one and not mentioned in another is to be performed as if mentioned in all documents.

In the event of an inconsistency in the Contract Documents, the terms of this Agreement shall prevail over all other Contract Document s. The order of precedence between the remaining Contract Documents shall be as set forth in The Greenbook.

The Contract Documents constitute the entire agreement between the parties and supersede any and all other writings and oral negotiations.

3. CITY’S REPRESENTATIVE.

The CITY’s Representative is Irina Gurovich, referred to herein as the Project Manager (“Project Manager”).

4. CONTRACTOR’S PROJECT MANAGER; PERSONNEL.
(a) Project Manager. CONTRACTOR’s Project Manager must be approved by City. Such approval shall be at CITY’s sole discretion. (b) Personnel. CITY has the right to review and approve any personnel who are assigned to perform work under this Agreement. CONTRACTOR shall remove Project and Specification No. 25-07
3 personnel from performing work under this Agreement if requested to do so by CITY.

This Paragraph 4 is a material provision of the Agreement.

5. SCHEDULE.

All Work shall be performed in accordanc e with the schedule approved on behalf of CITY by the Project Manager, and in accordance with the time of performance set forth in Paragraph 11 (Time of Performance).

6. EQUIPMENT - PERFORMANCE OF WORK.

CONTRACTOR shall furnish all tools, equi pment, apparatus, facilities, labor and materials necessary to perform and comple te the Work in a good and workmanlike manner in strict conformity with the Contract Documents.

The equipment, apparatus, facilities, labor and material shall be furnished and such Work performed and completed as required in the plans and specifications to the satisfaction of the Project Manager or his or her designee, and subject to his or her approval.

7. COMPENSATION.

CITY shall pay CONTRACTOR in accordan ce with the fee schedule set forth in CONTRACTOR’s bid. CONTRACTOR’s total compensation shall not exceed Two Million Five Hundred Twenty-Seven Thousand Seven Hundred Thirty-Seven Dollars and Zero Cents ($2,527,737.00).

8. ADDITIONAL SERVICES.

CONTRACTOR shall not receive compensation for any services provided outside the scope of the Contract Do cuments unless such additional services, including change orders, are approved in writing by CITY prior to CONTRACTOR performing the additional services.

It is specifically understood that oral request s or approvals of such additional services, change orders or additional compensat ion and any approvals from CITY shall be barred and are unenforceable.

9. PAYMENTS TO CONTRACTOR.

On or before the last Monday of each and every month during the performance of the Work, CONTRACTOR shall meet with the Project Manager or his or her designee to determine the quantity of pay items incorporated into the improvement during that month.

A “Progress Payment Order” will then be jointly prepared, approved, and signed by the Project Manager and the CONTRACTOR setting forth the amount to be paid and Project and Specification No. 25-07
4 providing for a five percent (5%) retention. Upon approval of the progress payment order by the Project Manager, or his or her designee, it shall be submitt ed to CITY’s Finance Department and processed for payment by obtai ning approval from the City Council to issue a warrant.

Within three (3) days following City Counc il’s approval to issue a warrant, CITY shall mail to CONTRACTOR a warrant for the amount specified in the progress payment order as the amount to be paid. The retai ned five percent (5%) shall be paid to CONTRACTOR thirty-five (35) days after the recording of the Notice of Completion of the Work by the CITY with the Orange County Clerk-Recorder and after CONTRACTOR has furnished releases of all claims against CITY by persons who furnished labor or materials for the Work, if required by CITY.

Upon the request of CONTRACT OR and at its expense, securities equivalent to the amount withheld pursuant to the foregoing provisions may be presented to CITY for substitution for the retained funds. If CITY approves the form and amount of the offered securities it will release the retained funds and will hold the securities in lieu thereof.

CONTRACTOR shall be entitled to any interest earned on the securities.

In the event that claims for property damage or bodily injury are presented to CITY arising out of CONTRACTOR’s or any subcontractor’s work under this Agreement, CITY shall give notice thereof to CONTRACTOR, and CONTRACTOR shall have thirty-five (35) days from the mailing of any such notice to evaluate the claim and to settle it by whole or partial payment, or to reject it, and to give notice of settlement or rejection to CITY. If CITY does not receive notice within the above-mentioned 35-day period that the claim has been settled, and if the Project Manager, after cons ultation with the City Attorney, determines that the claim is meritorious, CITY may pay the claim or a portion of it in exchange for an appropriate release from the claimant, and ma y deduct the amount of the payment from the retained funds that would otherwise be paid to CONTRACTOR upon completion of the Work; provided, however, that the maximum amount paid for any one claim pursuant to this provision shall be One Thousand Do llars ($1,000.00), and the maximum amount for all such claims in the aggregate paid pursuant to this provision shall be Five Thousand Dollars ($5,000.00).

10. PROMPT PAYMENT OF SUBCONTRACTORS.

CONTRACTOR agrees to pay each subcontractor under this Agreement for satisfactory performance of its contract no la ter than seven (7) days from the receipt of each payment the CONTRACTOR receives from CITY.

CONTRACTOR agrees further to release retainage payments to each subcontractor within thirty ( 30) days after the subcontractor ’s work is satisfactorily completed.

Any delay or postponement of payment from the above-referenced time frame may occur only for good cause following written approval of the CITY.

Project and Specification No. 25-07
5 11. TIME OF PERFORMANCE.

CONTRACTOR shall commence Work by the date specified in CITY’s Notice to Proceed, unless a later date is agreed upon in writing by the parties. The Work shall be completed within Two Hundred Twenty (220) calendar days from the first day of commencement of the Work.

12. TERMINATION.

(a) Termination for Convenience. CITY may terminate this Agreement at any time, with or without cause, by providing thirty (30) days’ written notice to CONTRACTOR.

(b) Termination for Breach of Contract.

(i) If CONTRACTOR refuses or fails to prosecute the Work or any severable part of it with such diligence as will ensure its timely completion, or if CONTRACTOR fails to complete the Work on time, or if CONTRACTOR, or any subcontractor, violates any of the provisions of the Contract Documents, the Project Manager may give written notice to CONTRACTOR and CONTRACTOR’s sureties of the CITY’s intention to terminate this Agreement; and, unless within five (5) days after the serving of that notice, such conduct shall cease and arrangements for the correction thereof be made to the satisfaction of the CITY, this Ag reement may be terminated at the option of CITY effective upon CONT RACTOR’s receipt of a second notice sent by the CITY indicating that the CITY has exercised its option to terminate.

(ii) If CONTRACTOR is adjudged bankru pt or files for any relief under the Federal Bankruptcy Code or State insolvency laws, this Agreement shall automatically terminate without any further action or notice by CITY.

(iii) If CONTRACTOR is in breach of any material provision of this Agreement, CITY may immediately terminate this Agreement by providing written notice to CONTRACTOR of same.

13. LIQUIDATED DAMAGES.

In the event the Work is not completed, for any reas on, within the time required including any approved extensions of time, and to the satisfaction of the Project Manager, CITY may, in addition to any other remedies , equitable and legal, including remedies authorized by Paragraph 12 (Termination) of this Agreement, charge to CONTRACTOR or its sureties, or deduct from payments or credits due CONTRACTOR, a sum equal to One Thousand Five Hundred Dollars ($1,500. 00) as liquidated damages for each Project and Specification No. 25-07
6 calendar day beyond the date provided for the completion of such work.

The parties hereto agree that the amount set forth abov e, as liquidated damages constitutes a fair and reasonable estimate of the costs the CITY would suffer for each day that the CONTRACTOR fails to meet the performance schedule. The parties hereby agree and acknowledge that the delays in the performanc e schedule will cause CITY to incur costs and expenses not contemplated by this Agreement.

14. PERFORMANCE BY SURETIES.

In the event CONTRACTOR fails or re fuses to perform the Work, CITY may provide CONTRACTOR with a notice of intent to terminate as provided in Paragraph 12 (Termination), of this Agreement. CITY shall immediately give written notice of such intent to terminate to CONTRACTOR and CONTRACTOR’s surety or sureties, and the sureties shall have the right to take over and perform this Agreement; provided, however, that the sureties must, within five (5) days after CITY ’s giving notice of termination, (a) give the CITY written notice of their intention to take over the perf ormance of this Agreement; (b) provide adequate assurances, to the satisfaction of the CITY, that the Work shall be performed diligently and in a timely manner; and (c) must commence performance thereof within five (5) days after providing notice to t he CITY of their intent ion to take over the Work. Upon the failure of the sureties to comply with the provisions set forth above, CITY may take over the Work and complete it, at the expense of CONTRACTOR, and the CONTRACTOR and the sureties shall be liable to CITY for any excess costs or damages including those referred to in Paragraph 13 (Liquidated Damages), incurred by CITY. In such event, CITY may, without liability for so doing, take possession of such materials, equipment, tools, appliances, Contract Documents and other property belonging to CONTRACTOR as may be on the site of the Work and reasonably necessary therefor and may use them to complete the Work.

15. DISPUTES PERTAINING TO PAYMENT FOR WORK.

Should any dispute arise respecting whet her any delay is excusable, or its duration, or the value of the Work done, or of any Work omi tted, or of any extra Work which CONTRACTOR may be required to do, or respecting any payment to CONTRACTOR during the performance of this Agreement, such dispute shall be decided by the Project Manager, and his or her dec isions shall be final and binding upon CONTRACTOR and its sureties.

16. SUPERINTENDENCE BY CONTRACTOR.

At all times during performance of the Work, CONTRACTOR shall give personal superintendence or have a competent foreman or superintendent on the worksite, with authority to act for CONTRACTOR.

17. INSPECTION BY CITY.

Project and Specification No. 25-07
7 CONTRACTOR shall at all times maintain proper facilities and provide safe access for inspection by CITY to all parts of the Wo rk and to all shops on or off-site where the Work or portions of the Work, are in preparation. CITY shall have the right of access to the premises for inspection at all times. Howe ver, CITY shall, at all times, comply with CONTRACTOR’s safety requirements on the job site.

18. CARE OF THE WORK A ND OFF-SITE AUTHORIZATION.

CONTRACTOR warrants that it has examined the site of the Work and is familiar with its topography and condition, location of property lines, easements, building lines and other physical factors and lim itations affecting the perfo rmance of this Agreement.

CONTRACTOR, at CONTRACTOR’s sole cost and expense, shall obtain any permission, and all approvals, licenses, or easements necessary for any operations conducted off the premises owned or controlled by CITY. CONTRACTOR shall be responsible for the proper care and protection of all materials delivered to the site or stored off-site and for the Work performed until completion and final inspection and acceptance by CITY. The risk, damage or destruction of materials delive red to the site or to Work performed shall be borne by CONTRACTOR.

19. CONTRACT SECURITY AND GUARANTEE.

CONTRACTOR shall furnish, concurrently with the execution of this Agreement, the following: (1) a surety bond in an amount equal to one hundred percent (100%) of the contract price as security for the faithful performance of this Agreement, and (2) a separate surety bond in an amount equal to at least one hundr ed percent (100%) of the contract price as security for the payment of all persons furn ishing labor or materials in connection with the Work under th is Agreement. Sureties for each of the bonds and the forms thereof shall be satisfactory to CITY. In addition, such sureties must be authorized to issue bonds in California; sureties must be listed on the latest revision to the U.S.

Department of the Treasury Circular 570; and must be shown to have sufficient bonding capacity to provide the bonds required by the Contract Documents.

CONTRACTOR shall provide a certified copy of the certificate of authority of the surety issued by the Insurance Commissioner; a certificate from the clerk of the county in which the court or officer is lo cated that the certif icate of authority of the surety has not been surrendered, revoked, canceled, annulled, or suspended or, in the event that it has, that renewed authority has been granted; and copies of the surety’s most recent annual statement and quarterly statement filed with the Departm ent of Insurance pursuant to Article 10 (commencing with Section 900) of Chapter 1 of Part 2 of Division 1 of the Insurance Code.

CONTRACTOR guarantees that all mate rials used in the Work and all labor performed shall be in conformity with the C ontract Documents including, but not limited to, the standards and specifications set forth in the most current edition of The Greenbook.

CONTRACTOR shall, at its own expense, make any and all repairs and replacements that shall become necessary as the result of any failure of the Work to conform to the Project and Specification No. 25-07
8 aforementioned Contract Documents, and/or standard specifications; provided, however, that CONTRACTOR shall be obligated under this provision only to the extent of those failures or defects of which CONTRACTOR is given notice within a period of twelve (12) months from the date that the Notice of Completion is recorded.

The rights and remedies available to CITY pursuant to this provision shall be cumulative with all rights and remedies ava ilable to CITY pursuant to statutory and common law, which rights and remedies are her eby expressly reserved, and neither the foregoing guarantee by CONTRACT OR nor its furnishing of the bonds, nor acceptance thereof by CITY, shall constitu te a waiver of any rights or remedies available to CITY against CONTRACTOR.

20. INDEMNIFICATION.

CONTRACTOR agrees to protect, defend, indemnify and hold harmless CITY and State of California Department of Parks and Recreation (“STATE”) and their elected and appointed boards, officers, agents, and employees from any and all claims, liabilities, expenses, or damages of any nature, including a ttorneys’ fees, for injury to or death of any person, and for injury or damage to any property, including consequential damages of any nature resulting therefrom, arisi ng out of or in any way connected with the performance of this Agreemen t. The defense obligation pr ovided for hereunder shall apply without any advance showing of negligence or wrongdoing by the CONTRACTOR, its employees, and/or authorized subcontractor s, but shall be required whenever any claim, action, complaint, or suit asserts as its basis the negligence, errors, omissions or misconduct of the CONTRACTOR, its employ ees, and/or authorized subcontractors, and/or whenever any claim, action, complaint or suit asserts liability against the CITY and STATE, its elected officials, officers, agents and employees based upon the work performed by the CONTRACTOR, its employees, and/or authorized subcontractors under this Agreement, whether or not the CONTRACTOR, its employees, and/or authorized subcontractors are specifically named or otherwise asserted to be liable. Notwithstanding the foregoing, the CONTRACTOR shall not be liable for the defense or indemnification of the CITY and STATE for claims, actions, complaints or suits arising out of the sole active negligence or willful misconduct of the CITY and STATE. This provision shall supersede and replace all other indemnity provisions contained either in the CITY’s specifications or CONTRACTOR’s proposal, which shall be of no force and effect.

CONTRACTOR shall comply with all of the provisions of the Workers’ Compensation insurance laws and Safety in Employment laws of the State of California, including the applicable provisions of Divisions 4 and 5 of the California Labor Code and all amendments thereto and regul ations promulgated pursuant thereto, and all similar State, Federal or local laws applicable ; and CONTRACTOR shall indemnify and hold harmless CITY and STATE from and against all claims, liabilities, expenses, damages, suits, actions, proceedings and judgments, of every nature and description, including attorney fees, that may be presented, brought or recovered against CITY and STATE for or on account of any liability under or failure to comply with any of said laws which may be incurred by reason of any Work perform ed under this Agreement by CONTRACTOR Project and Specification No. 25-07
9 or any subcontractor or others performing on behalf of CONTRACTOR.

CITY and STATE do not, and shall not, waive any rights against CONTRACTOR which it may have by reason of the above ho ld harmless agreements, because of the acceptance by CITY and STATE or the deposit with CITY and STATE by CONTRACTOR of any or all of the insur ance policies described in Paragr aph 21 (Insurance) of this Agreement.

The hold harmless agreements by CONTRACT OR shall apply to all liabilities, expenses, claims, and damages of every kind (including but not limited to attorneys’ fees) incurred or alleged to have been incurred, by reason of the operations of CONTRACTOR or any subcontractor or ot hers performing on behalf of CONTRACTOR, whether or not such insurance policies are applicable. CONTRA CTOR shall require any and all tiers of subcontractors to afford the same degree of indemnification to the CITY and STATE and their elected and appointed boards, officers, agent s, and employees that is required of CONTRACTOR and shall incorporate identical indemnity provisions in all contracts between CONTRACTOR and all tiers of its subcontractors.

In the event that CONTRACTOR and CI TY and STATE are sued by a third party for damages caused or allegedly caused by negligent or other wrongful conduct of CONTRACTOR, or by a dangerous condition of CITY’s and STATE’s property created by CONTRACTOR or existing while the property was under t he control of CONTRACTOR, CONTRACTOR shall not be relie ved of its indemnity obligat ion to CITY and STATE by any settlement with any such third party unless that settlement includes a full release and dismissal of all claims by the third party against the CITY and STATE.

21. INSURANCE.

(a) Minimum Scope and Limits of Insurance. CONTRACTOR shall not commence work under this Agreement until it has obtained all insurance required under this Paragraph 21 and CITY has approved the insurance as to form, amount, and carrier, nor shall CONTRACTOR allow any subcontractor to commence any Work until all similar insurance required of the subcontractor has been obtained and approved.

CONTRACTOR shall obtain, maintain, and keep in full force and effect during the life of this Agreement all of the following minimum scope of insurance coverages with an insurance company admitted to do business in California, rated “A,” Class X, or better in the most recent Best’s Key Insurance Rating Guide, and approved by CITY:

(i) Commercial general liability, in cluding premises-operations, products/completed operations, broad form property damage, blanket contractual liability, independent contractors, personal injury or bodily injury with a policy limit of not less than One Million Dollars ($1,000,000.00) per occurrence. If such insurance contains a general aggregate limit, it shall apply separately to this Agreement or shall be twice the required occurrence limit.

Project and Specification No. 25-07
10 (ii) Business automobile liability for owned vehicles, hired, and non- owned vehicles, with a policy limit of not less than One Million Dollars ($1,000,000.00) combined single limit per accident for bodily injury and property damage.

(iii) Workers’ compensation insurance as required by the State of California, with Statutory Limits, and Employer’s Liability insurance with a limit of no less than One Million Dollars ($1,000,000.00) per accident for bodily injury or disease. CONTRACTOR agrees to waive, and to obtain endorsements fr om its workers’ compensation insurer waiving subrogation right s under its workers’ compensation insurance policy agains t the CITY and STATE, its officers, agents, employees, and volunteers arisi ng from work performed by CONTRACTOR for the CITY and STATE and to require each of its subcontractors, if any, to do likewise under their workers’ compensation insurance policies.

(iv) Umbrella or excess liability insu rance that will provide bodily injury, personal injury and property damage li ability coverage at least as broad as the primary coverages set forth above, including commercial general liability, autom obile liability, and employer’s liability. Such policy or policies shall include the following terms and conditions:

(1) A drop down feature requiring the policy to respond in the event that any primary insur ance that would otherwise have applied proves to be uncollectable in whole or in part for any reason;
(2) Pay on behalf of wording as opposed to reimbursement; (3) Concurrency of effective dates with primary policies; (4) Policies shall “follow form” to underlying primary policies; and (5) Insureds under primary policies shall also be insureds under the umbrella or excess policies.

(b) Endorsements. The commercial gener al liability insurance policy and business automobile liability policy shall contain or be endorsed to contain the following provisions:

(i) Additional insureds: The City of Costa Mesa and State of California Department of Parks and Recreation and their elected and appointed boards, officers, officials, agents, employees, and volunteers are additional insureds with respect to: liability arising out of activities performed by or on behalf of th e CONTRACTOR pursuant to its contract with the City; products and completed operations of the CONTRACTOR; premises owned, occupied or used by the
Project and Specification No. 25-07
11 CONTRACTOR; automobiles owned, leased, hired, or borrowed by the CONTRACTOR.”

(ii) Notice: “Said policy shall not term inate, nor shall it be canceled nor the coverage reduced, until thirty ( 30) days after written notice is given to CITY.”

(iii) Other Insurance: “CONTRACTO R’s insurance coverage shall be primary insurance as respects the City of Costa Mesa, its officers, officials, agents, employees, and volunteers. Any other insurance maintained by the City of Costa Mesa shall be excess and not contributing with the insurance provided by this policy.”

(c) Reporting Provisions. Any failure of CONTRACTOR to comply with the reporting provisions of the policies shall not affect coverage provided to the City of Costa Mesa, its officers, officials, agents, employees, and volunteers.

(d) Insurance Applies Separately. CONTRACTOR’s insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the limits of the insurer’s liability.

(e) Deductible or Self-Insured Retention. If any of such policies provide for a deductible or self-insured retention to prov ide such coverage, the amount of such deductible or self-insured retention shall be approved in advance by CITY. No policy of insurance issued as to which the CITY is an additional insured shall contain a provision which requires that no insured except the named insured can satisfy any such deductible or self-insured retention.

(f) Proof of Insurance. Prior to commencement of the Work, CONTRACTOR shall furnish CITY, through the Project Mana ger, proof of compliance with the above insurance requirements in a form satisfactory to City’s Risk Management.

(g) Non-Limiting. Nothing in this Paragraph 21 shall be construed as limiting in any way, the indemnification provision contained in this Agreement, or the extent to which Consultant may be held responsible for payments of damages to persons or property.

22. PREVAILING WAGE REQUIREMENTS.

(a) Prevailing Wage Laws. CONTRACTOR is aware of the requirements of Chapter 1 (beginning at Section 1720 et seq.) of Part 7 of Division 2 of the California Labor Code, as well as Title 8, Section 16000 et seq. of the California Code of Regulations (“Prevailing Wage Laws”), which require the payment of prevailing wage rates and the performance of other requirements on “public works” and “maintenance” projects. This Project is a “public works” project and requires compliance with the Prevailing Wage Laws. CONTRACTOR shall defend, indemnify and hold the CITY, its elected officials, officers, employees and agents free and harmless from any claim or liability arising out of Project and Specification No. 25-07
12 any failure or alleged failure to comply with the Prevailing Wage Laws.

(b) Payment of Prevailin g Wages. CONTRACTOR shal l pay the prevailing wage rates for all work performed under this Agreement. When any craft or classification is omitted from the general prevailing wage determinations, CONTRACTOR shall pay the wage rate of the craft or classification most closely related to the omitted classification. A copy of the general prevailing wage rate determi nation is on file in the Office of the City Clerk and is incorporated into this Agreement as if fully set forth herein. CONTRACTOR shall post a copy of such wage rates at all times at the project site(s).

(c) Legal Working Day. In accordance with the provisions of Labor Code Section 1810 et seq., eight (8) hours is the legal wo rking day. CONTRACTOR and any subcontractor(s) of CONTRACTOR shall comply with the provisions of the Labor Code regarding eight (8)-hour workday and 40-hour wo rk week requirements, and overtime, Saturday, Sunday, and holiday work. Work performed by CONTRACTOR’s or any subcontractor’s employees in excess of eight (8) hours per day, and 40 hours during any one week, must include compensation for all hours worked in excess of eight (8) hours per day, or 40 hours during any one week, at not less than one and one-half times the basic rate of pay. CONTRACTOR shall forfeit as a penalty to CITY Twenty-Five Dollars ($25.00), or any greater penalty set forth in the Labor Code, for each worker employed in the execution of the Work by CONTRACTOR or by any subcontractor(s) of CONTRACTOR, for each calendar day during which such worker is required or permitted to the work more than eight (8) hours in one calendar day or more than 40 hours in any one calendar week in violation of the Labor Code.

(d) Apprentices. CONTRACTOR shall comply with the provisions of Labor Code Section 1777.5 concerning the employment of apprentices on public works projects.

CONTRACTOR shall be responsible for ensuring compliance by its subcontractors with Labor Code Section 1777.5.

(e) Payroll Records. Pursuant to Labor Code Section 1776, CONTRACTOR and any subcontractor(s) shall keep accurate payroll records, showing the name, address, social security number, work classifi cation, straight time and overtime hours worked each day and week, and the actual per diem wages paid to each journeyman, apprentice, worker, or other employee employed by CONTRACTOR or any subcontractor in connection with this Agreement. Each payroll record shall contain or be verified by a written declaration that it is made under penalty of perjury, st ating both of the following:
(1) The information contained in the payroll record is true and correct; and (2) The employer has complied with the requirements of Sections 1771, 1881, and 1815 of the Labor Code for any work performed by his or her employees on this Project. The payroll records shall be certified and shall be availabl e for inspection at all reasonable hours in accordance with the requirements of Labor Code Section 1776. CONTRACTOR shall also furnish each week to CITY’s Project Administration Division a statement with respect to the wages of each of its employees during the preceding weekly payroll period.

(f) Registration with DIR. CONTRA CTOR and any subcontractor(s) of Project and Specification No. 25-07
13 CONTRACTOR shall comply with the provisions of Labor Code Section 1771 and Labor Code Section 1725.5 requiring registration with the DIR.

23. COMPLIANCE WITH ALL LAWS.

CONTRACTOR shall, at its own cost and expense, comply with all applicable local, state, and federal laws, regulations, and requirements in the performance of this Agreement, including but not limited to laws regarding health and safety, labor and employment, and wage and hours.

24. ADDITIONAL CONTRACT PROVISIONS – State. Contractor shall comply with all of the terms and conditions of the documents included in Exhibit “A”, specifically, State of California – Natural Resources Agency Departm ent of Parks and Recreation Grant Contract, attached hereto and incorporated herein by this reference as though set forth in full.

25. DRUG-FREE WORKPLACE POLICY.

CONTRACTOR, upon notification of the awar d of this Agreement, shall establish a Drug-Free Awareness Program to inform employees of t he dangers of drug abuse in the workplace, the penalties that may be imposed upon employees for drug abuse violations occurring in the workplace, and the employee assistance programs available to employees. Each employee engaged in the per formance of a CITY contract must be notified of this Drug-Free Awareness Pr ogram, and must abide by its terms.

CONTRACTOR shall conform to all the r equirements of CITY’s Policy No. 100-5, attached hereto. Failure to establish a progra m, notify employees, or inform the CITY of a drug-related workplace conviction will constitute a material breach of contract and cause for immediate termination of the contract by the CITY.

26. NON–DISCRIMINATION.

In performing this Agreement, CONTRACTOR will not engage in, nor permit its agents to engage in, discrimination in employm ent of persons because of their race, religion, color, national orig in, ancestry, physical handicap , medical condition, marital status or sex, or sexual orientation, except as permitted pursuant to Section 12940 of the Government Code. Violation of this provisi on may result in the imposition of penalties referred to in Section 1735 of the California Labor Code.

27. PROVISIONS CUMULATIVE.

The provisions of this Agreement are cumulative and in addition to, and not in limitation of, any other rights or remedies available to CITY.

28. NOTICES.

It shall be the duty and responsibility of CONTRACTOR to notify all tiers of subcontractors and material m en of the following special not ice provision; namely, all Project and Specification No. 25-07
14 preliminary 20-day notices or stop notices shall be directed only to the City Clerk and to no other department, and shal l be either personally delivered or sent by certified mail, postage prepaid.

All other notices shall be in writing and delivered in person or sent by certified mail, postage prepaid. Notices required to be given to CITY pursuant to this Agreement shall be addressed as follows:

City of Costa Mesa
77 Fair Drive
Costa Mesa, CA 92626
Attn: Irina Gurovich

Notices required to be given to CONTRACTOR shall be addressed as follows:

Elegant Construction, Inc.
15375 Barranca Parkway, Suite J-103
Irvine, CA 92618
Attn: Hazem Almassry, CFO/Vice President

Notices required to be given to CONTRACTOR’s sureties shall be addressed as follows:

_____________________________
_______________________________
_______________________________
Attn: _________________________

29. INDEPENDENT CONTRACTOR.

The parties hereto acknowledge and agree that the relationship between CITY and CONTRACTOR is one of principal and independent contractor and no other. All personnel to be utilized by CONTRACTOR in the performance of this Agreement shall be employees of CONTRACTOR and not employees of the CITY. CONTRACTOR shall pay all salaries and wages, employer’s social security taxes, unemployment insurance and similar taxes relating to employees and shall be responsible for all applicable withholding taxes.

Nothing contained in this Agreement sha ll create or be construed as creating a partnership, joint venture, employment relations, or any other relationship except as set forth between the parties. The parties specifically acknowledge and agree that CONTRACTOR is not a partner with CITY, whether general or limited, and no activities of CITY or CONTRACTOR or statements made by CITY or CONTRACTOR shall be interpreted by any of the parties hereto as establishing any type of business relationship other than an independent contractor relationship.

30. PERS ELIGIBILITY INDEMNIFICATION.

Project and Specification No. 25-07
15 In the event that CONTRACTOR or any employee, agent, or subcontractor of CONTRACTOR providing services under this Agreement claims or is determined by a court of competent jurisdiction or the Calif ornia Public Employees’ Retirement System (PERS) to be eligible for enrollment in PERS as an employee of the CITY, CONTRACTOR shall indemnify, defend, and hold harmless CITY for the payment of any employee and/or employer contributions for PERS benefits on behalf of CONTRACTOR or its employees, agents, or subcontractors, as well as for the payment of any penalties and interest on such contributions, which would otherwise be the responsibility of CITY.

Notwithstanding any other agency, state or federal policy, rule, regulation, law or ordinance to the contrary, CONTRACTOR and any of its empl oyees, agents, and subcontractors providing service under this Agreement shall not qual ify for or become entitled to, and hereby agree to waive any claims to, any compensation, benefit, or any incident of employment by CITY, including but not limited to eligibility to enroll in PERS as an employee of CITY and entit lement to any contribution to be paid by CITY for employer contribution and/or employee contributions for PERS benefits.

31. VALIDITY.

The invalidity in whole or in part of any provision of th is Agreement shall not void or affect the validity of any of the other provisions of this Agreement.

32. GOVERNING LAW.

This Agreement shall be governed by and construed in accordance with the laws of the State of California. Any legal action relating to or arising out of this Agreement shall be subject to the jurisdiction of the County of Orange, California.

33. NO THIRD PARTY BENEFICIARY RIGHTS.

This Agreement is entered into for the sole benefit of the CITY and CONTRACTOR and no other parties are intended to be direct or incidental beneficiaries of this Agreement and no third party shall have any right in, under or to this Agreement.

34. ASSIGNABILITY.

This Agreement may not be transferred or assigned by either party, or by operation of law, to any other person or persons or business entity, without the other party’s written permission. Any such transfer or assignmen t, or attempted transfer or assignment, without written permission, may be deemed by the other party to constitute a voluntary termination of this Agreement and this Agreement shall thereafter be deemed terminated and void.

35. WAIVER.

No waiver of any provision of this Agr eement shall be effective unless in writing Project and Specification No. 25-07
16 and signed by a duly authorized r epresentative of the party against whom enforcement of a waiver is sought referring expressly to this Paragraph. The waiver of any right or remedy in respect to any occurrence or even t shall not be deemed a waiver of any right or remedy in respect to any other occurrence or event, nor shall any waiver constitute a continuing waiver.

36. HEADINGS.

Section and subsection headings are not to be considered part of this Agreement, are included solely for convenience, and are not intended to modify or explain or to be a full or accurate description of the content thereof.

37. CONSTRUCTION.

The parties have participated jointly in the negotiation and drafting of this Agreement and have had an adequate opportunity to review each and every provision of the Agreement and submit the same to couns el or other consultants for review and comment. In the event an ambiguity or question of intent or interpretation arises with respect to this Agreement, this Agreement sha ll be construed as if drafted jointly by the parties and in accordance with its fair meaning. There shall be no presumption or burden of proof favoring or disfavoring any party by virtue of the authorship of any of the provisions of this Agreement.

38. COUNTERPARTS.

This Agreement may be executed in one or more counterparts by the parties hereto. All counterparts shall be construed together and shall constitute one Agreement.

39. CORPORATE AUTHORITY.

The persons executing this Agreement on behalf of the parties hereto warrant that they are duly authorized to execute this Agreem ent on behalf of said parties and that by doing so, the parties hereto are formally bound to the provisions of this Agreement.

40. EXECUTIVE ORDER N- 6-22 RUSSIA SANCTIONS.

On March 4, 2022, Governor Gavin Ne wsom issued Executive Order N-6-22 (the EO) regarding Economic Sanctions against Russia and Russian entities and individuals. "Economic Sanctions" refers to sanctions im posed by the U.S. gover nment in response to Russia's actions in Ukraine, as well as any sanctions imposed under state law. The EO directs state agencies to terminate contracts with, and to refrain from entering any new contracts with, individuals or entities that are determined to be a target of Economic Sanctions. This Executive Order extends to recipients of any State Grants (Grantee).

Grantees include those who have contracted or will contract to receive State grants funds.

Accordingly, should the State determine that a Grantee is a target of Economic Sanctions or is conducting prohibited transactions with sanc tioned individuals or entities, that shall Project and Specification No. 25-07
17 be grounds for termination of this agreement . The State shall provide the Grantee advance written notice of such termination, allowing the Grantee at least 30 calendar days to provide a written response. Termination of any contract found to be in violation of this Executive Order shall be at the sole discretion of the State.

[Signature page follows.]
Project and Specification No. 25-07
18 IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed by and through their respective authorized officers, as of the date first above written.

CITY OF COSTA MESA
A municipal corporation

__________________________________ Date: _____________________ Cecilia Gallardo-Daly
City Manager

CONTRACTOR

__________________________________ Date: _____________________ Signature

__________________________________
Name and Title (print)

ATTEST:

__________________________________ Date: _____________________ Brenda Green
City Clerk

APPROVED AS TO FORM:

__________________________________ Date: _____________________ Kimberly Hall Barlow
City Attorney

APPROVED AS TO INSURANCE:

__________________________________ Date: _____________________ Ruth Wang
Risk Management

Project and Specification No. 25-07
19 APPROVED AS TO PURCHASING:

__________________________________ Date: _____________________ Carol Molina
Finance Director

DEPARTMENTAL APPROVAL:

__________________________________ Date: _____________________ Raja Sethuraman
Public Works Director

__________________________________ Date: _____________________ Irina Gurovich
Project Manager

EXHIBIT A

CONTRACTOR’S BID

Project and Specifications No. 25-07
Ketchum – Libolt Park Expansion
P-1a BID PROPOSAL

PROPOSAL FOR THE

KETCHUM-LIBOLT PARK EXPENSION
(2150 MAPLE STREET, COSTA MESA)
CITY PROJECT NO. 25-07
The Honorable City Council
City of Costa Mesa
77 Fair Drive
Costa Mesa, CA 92626
Dear Councilmembers:

In compliance with the NOTICE INVITING BIDS FOR THE KETCHUM-LIBOLT PARK EXPANSION, CITY PROJECT NO. 25-07, a copy which is hereto attached, the undersigned has carefully examined the location of the proposed Work, the Plans, Specifications and other Contract Documents and is therefore satisfied as to the conditions to be encountered, as to the character, quality and quantity of work to be performed and materials to be furnished and as to the requirements of the specifications and the Contract. It is mutually agreed that the submission of a proposal shall be consider ed prima facie evidence that the BIDDER has made such examination.

If awarded the Contract, the undersigned agrees to commence the Work under the Contract WITHIN TEN (10) WORKING DAYS AFTER DATE OF CONTRACT, AND COMPLETE SAID WORK WITHIN TWO HUNDRED TWENTY (220) DAYS from the first day of commencement of such work unless legal extension is granted in accordance with the terms set forth in the specifications, and to perform and complete the Work as shown on the Plans and in accordance with the Specificatio ns and other Contract Documents, and to furnish all labor, materials, tools and equipment necessary to complete the Work in-place therefor, in the manner and time herein prescribed at the following prices, to wit:

TOTAL BASE BID AMOUNT (in Figures):

TOTAL BASE BID AMOUNT (in Words):
___________________________________________________________________________ TOTAL BASE BID PLUS ADDITIVE ALTERNATE BID 1 AMOUNT (in figures):
____________
Bidder's Initials
H.A

Two million five hundred twenty-seven thousand seven hundred thirty-seven $2,640,337.00

Project and Specifications No. 25-07
Ketchum – Libolt Park Expansion
P-1b BID PROPOSAL

PROPOSAL (CONTINUED)
NOTES:

1. The accuracy of estimate quantities as shown is not guaranteed; the Bidder shall make his/her own estimate from the drawings and field review for verification. If the unit price and the total amount are different, the unit price will control the bid. Payment shall be base d on actual work done and/or actual quantities used.

2. The City reserves the right to delete on e or more bid items and/or to increase or decrease bid items’ quantities, at no additional cost to the City.

3. (*) Allowance is for unforeseen work not included in the contract documents and to be included in the total bid amount as identified as follows. Use of the allowance will be at the sole discretion of the City and must be authorized in writing at the discretion of the City. This Bid item will cover unforeseen work that is not included in the contract documents. Any money used from the project allowance will be authorized via an Allowance Disbursement Form at the City’s sole discretion. Any amount of money remaining in the Allowance line item upon completion of the Project will be deducted from the Contract by Deductive Change Order for the full amount(s) remaining therein. The Contractor has no beneficial interest in, and/or claim to, the Allowances and hereby disclaims any and all such interests.

4. (**) Schedule of Values shall be submitted before 4:00 PM of the 5th business day following the bid opening. Price includes the indirect cost and markup.

5. FA designates force account. Payment shall be made on a time and materials basis, only if directed by the Engineer.

6. Request for Information shall be submitted before 4PM Monday August 11 th
2025.

7. (F) Designates Final Pay Item. When an item of work is designated as “FINAL PAY ITEM” in the Specifications, the estima ted quantity for that item of work shall be the final pay quantity, unless the dimensions of any portion of that item are revised by the Engineer, or the item or any portion of the item is eliminated.

If the dimensions of any portion of the item are revised, and the revisions result in an increase or decrease in the estimated quantity of that item of work, the final pay quantity for the item will be revised in the amount represented by the changes in the dimensions. If a final pay item is eliminated, the estimated quantity for the item will be eliminated. If a portion of a final pay item is eliminated, the final pay quantity will be revised in the amount represented by the eliminated portion of the item of work.

The estimated quantity for each item of work designated as “FINAL PAY ITEM” in the Specifications, shall be considered as approximate only, and no guarantee is made that the quantity which can be determined by computations, based on the details and dimensions shown on the plans, will equal the estimated quantity. No allowance will be made in the event that the quantity based on computations does not equal the estimated quantity. In case of discrepancy between the quantity shown in the Engineer’s Estimate for a final pay item and the quantity or summation of quantities for the same item shown on the plans, payment will be based on the quantity shown in the Engineer’s Estimate.
____________
Bidders Initials
H.A
Project and Specifications No. 25-07
Ketchum – Libolt Park Expansion

P-1c BID PROPOSAL

Project and Specification No. 25-07

P-2a PROPOSAL

PROPOSAL SCHEDULE
(CONTINUED)
The Contractor agrees that the City will not be held responsible if any of the approximate quantities shown in the foregoing proposal shall be found incorrect, and he shall not make any claim for damages or fo r loss of profits because of a difference between the quantities of the various classes of work as estimated and the work actually done. If any error, omission or misstatem ents shall be discovered in the estimated quantities, it shall not invalidate this contract or release the Contractor from the execution and completion of the whole or part of the wo rk herein specified, in accordance with the specifications and the plans herein mentio ned and the prices he rein agreed upon and fixed therefore, or excuse him from any of the obligations or liabilities hereunder, or entitle him to any damages or compensation otherwise than as provided for in this contract.

The Contractor agrees that the City shall have the right to increase or decrease the quantity of any bid item or portion of th e work or to omit portions of the work as may be deemed necessary or expedient, and that the payment for incidental items or work, not separately provided in the proposal shall be considered included in the price bid for other various items or work.

Accompanying this proposal is "Cash," "Certified Check," o "Bidder's Bond" (circle one) in the amount of
($ ) equal to at least ten (10%) percent of the total bid price, payable to the City of Costa Mesa, to guarantee that within fourteen (14) days after written notice is deposited in the mail, or the bidder has rece ived notice by telephone, the bidder will furnish proper Certificates of Insurance, an d required bonds satisfactory to the City and execute a contract in accordance with the proposal and in the manner and form required by the contract documents.

The undersigned deposits the above-named security as a proposal guarantee and agrees that it shall be forfeited to the City of Costa Mesa as Liquidated Damages if the above requirements are not complied with.
_____________
Bidder's Initials
H.A
Project and Specification No. 25-07

P-3 PROPOSAL
Respectfully Submitted,
Contractor's Business Name Contractor Title Business Address: Street Singed By Title City State Zip Contractor's License No. and Classification Exp. Date Business Phone Number Date
Name Title Residence: Street
City State Zip Residence phone Number If the bid is by a corporation, state the names of the officers who can sign an agreement on behalf of the corporation and whether more than one officer must sign.

Corporation Taxpayer I.D. Number:

Can Sign Must Sign
Name
Name
Name
If the bid is by a partnership or a joint venture, state the names and addresses of all general partners and joint ventures.

Partnership or Joint Ventures Taxpayer I.D. Number:

Name
Address
Name
Address
If the bidder is a sole proprietorship or another entity that does business under a fictitious name, the bid shall be in the real name of the bidder with a designation following showing "DBA (the fictitious name)"; provided, however, no fictitio us name shall be used unless there is a current registration with the Orange County Recorder.

The full names and residences of all persons and parties interested in the foregoing proposal, as principals, are as follows:

NOTE: Give first and last names in full; in case of corporation, give names of President, Secretary, Treasurer and Manager, and affix corporate seal; in case of partnerships and joint ventures, give names of all the individual members. _____________
Bidder's Initials
Elegant Construction Inc
15375 Barranca Parkway suite J-103
Irvine CA92618
949 444-5161
Hazem Almassry Vice President
A, B, C8, C12, C13, C36, C541053447 05-31-27
Hazem Almassry Vice President
Elegant Construction Inc CFO/Vice President
08-18-25
15375 Barranca Parkway suite J-103
949 444-5161Irvine California 92618
Hazem Almassry
Sam Alhakim
N/A
Hazem Almassry CFO/Vice President
Sam Alhakim CEO/President
H.A

Project and Specification No. 25-07

P-5a BIDDERS LIST

CITY OF COSTA MESA BIDDERS LIST
All bidders/proposers are required to provide the following information for all DBE and non-DBE subcontractors and suppliers, who provided a pr oposal, bid, quote, or were contacted by the proposed prime. This information is also required from the proposed prime contractor, and must be submitted with their bid/proposal. City of Costa Mesa will use this information to maintain and update a “Bidders List” to assist in evaluating the level of DBE participation on all Public Works projects. To the extent permitted by law, all information submitted will be held in confidence.

If Bidders List information is not submitted with the bid, it shall be submitted to the City of Costa Mesa, Construction Management Division, 77 Fair Drive, Costa Mesa, CA 92626, no later than 4:00 p.m. on the fourth day, not including Satu rdays, Sundays and legal holidays, following the bid opening. Bidders List information sent by U.S. Postal Service certified mail with return receipt and certificate of mailing and mailed on or before the third day, not including Saturdays, Sundays and legal holidays, following bid opening will be accepted even if it is received after the fourth day following bid opening. Failure to submit the required Bidders List information by the time specified will be grounds for finding the bid or proposal non-responsive.

Firm Name: ___________________________________ Phone: _________________ Address: _____________________________________ Fax: _________________ _____________________________________
Contact Person: _______________________________ No. of years in business:____ Is the firm currently certified as a DBE under 49 CFR Part 26? YES NO Type of work/services/materials provided by firm? __________________________________ What was your firm’s Gross Annual receipts for last year? Less than $1 Million
Less than $5 Million
Less than $10 Million
Less than $15 Million
More than $15 Million
This form can be duplicated if necessary to report all bidders (DBE subcontractors, non-DBE subcontractors and/or suppliers’ information).

3. Bidder's Initials
H.A
Elegant Construction Inc 949 444-5161
15375 Barranca Parkway suite J-103
Irvine CA92618
Hazem Almassry 6
All construction services
Project and Specification No. 25-07

P-6 BIDDERS BOND

BIDDER'S BOND TO ACCOMPANY PROPOSAL
(Required if the bidder desires to submit bond instead of a certified or cashier's check.) KNOW ALL PEOPLE BY THESE PRESENTS:

That we, as
principals, and _______________________________________________________ as surety, are held and firmly bound unto the City of Costa Mesa, a municipal corporation, organized under the laws of the State of California and situated in Orange County in the sum of ________________________________________________ ($_____________) to be paid to the City, its successors and assigns, for which payment well and truly to be made, we bind ourselves, our heirs, executors, and administrators, successors or assigns, jointly and severally firmly by these presents.

THE CONDITION OF THIS OBLIGATION IS SUCH,
That is the certain proposal of t he above bounden, _____________________, if accepted by the City of Costa Mesa, and if the above bounden, ________________________________________, his heirs, executors, administrators, successors and assigns, shall duly enter into and execute a contract for such construction, and shall execute and deliver the CERTIFICATE OF INSURANCE and the LABOR AND MATERIAL and the FAITHFUL PERFORMANCE BONDS described within fourteen (14) days from the date of the mailing of a notice of the above bounden, _________________________________________________, by and from the City, that said contract is ready for execution, then this obligation shall become null and void; otherwise it shall be and remain in full force and virtue.

IN WITNESS WHEREOF:

We hereunto set our hands and seals this _____ day of _____________, 20__. _______________________________ _______________________________ ________________________________ _______________________________ ________________________________ _______________________________ Contractor/ Principal Surety/Power of Attorney
(Notary Acknowledgement to be attached) (Notary Acknowledgment to be attached)

____________________
Bidder's Initials
see attached
H.A
Project and Specification No. 25-07

P-7 CONTRACT ASSURANCE

CONTRACT ASSURANCE
The CONTRACTOR or subcontractor shall not discriminate on the basis of race, color, national origin, or sex in the performance of this contract. The CONTRACTOR shall carry out applicable requirements of 49 CFR part 26 in the award and administration of DOT-assisted contracts. Failure by the CONTRACTOR to carry out these requirements is a material breach of this contract, which may result in the termination of this contract or such other remedy as recipient deems appropriate.

The CONTRACTOR will require that the above provision is included in all subcontracts.

_____________
Bidder's Initials
H.A

Project and Specification No. 25-07

P-9 WORKERS COMPENSATION

CONTRACTOR'S CERTIFICATION
OF

WORKERS' COMPENSATION INSURANCE REQUIREMENTS
FOR

PUBLIC WORKS PROJECTS
(Labor Code §1861)
I am aware of the provisions of Section 3700 of the California Labor Code which requires every employer to be insured against liability for workers' compensation or to undertake self-insurance in accordance with the provisions of that Code, and I will comply with such provisions before commencing the performance of the work of this contract.

Dated:

CONTRACTOR
Company Name
PROJECT: KETCHUM-LIBOLT PARK EXPANSION
City Project No. 23-07
_____________
Bidder's Initials
08-18-25
Elegant Construction Inc
H.A
Project and Specification No. 25-07

P-9a DRUG-FREE WORKPLACE

DRUG-FREE WORKPLACE POLICY
CONTRACTOR, upon notification of contract award, shall establish a Drug-Free Awareness Program to inform employees of the dangers of drug abuse in the workplace, the penalties that may be imposed upon employees for drug abuse violations occurring in the workplace, and the employee assistance programs available to employees. Each employee engaged in the performance of a CITY contract must be notified of this Drug- Free Awareness Program, and must abide by its terms. Failure to establish a program, notify employees, or inform CITY of a drug-re lated workplace conviction will constitute a material breach of contract and cause for immediate termination of the contract by CITY.

CONTRACTOR shall conform to all the requirements of CITY'S Policy No. 100-5.

A copy of this policy is attached to the sample contract agreement as an attachment in the Project Specifications.
_____________
Bidder's Initials
H.

A

Project and Specification No. 25-07
P-5a BIDDERS LIST

CITY OF COSTA MESA BIDDERS LIST
All bidders/proposers are required to provide the following information for all DBE and non-DBE subcontractors and suppliers, who provided a proposal, bid, quote, or were contacted by the proposed prime. This information is also required from the proposed prime contractor, and must be submitted with their bid/proposal. City of Costa Mesa will use this information to maintain and update a “Bidders List” to assist in evaluating the level of DBE participation on all Public Works projects. To the extent permitted by law, all information submitted will be held in confidence.

If Bidders List information is not submitted with the bid, it shall be submitted to the City of Costa Mesa, Construction Management Division, 77 Fair Drive, Costa Mesa, CA 92626, no later than 4:00 p.m. on the fourth day, not including Satu rdays, Sundays and legal holidays, following the bid opening. Bidders List information sent by U.S. Postal Service certified mail with return receipt and certificate of mailing and mailed on or before the third day, not including Saturdays, Sundays and legal holidays, following bid opening will be accepted even if it is received after the fourth day following bid opening. Failure to submit the required Bidders List information by the time specified will be grounds for finding the bid or proposal non-responsive.

Firm Name: _ ,05 ,QF__________________________ Phone: _


_____
Address: _  &RU\GRQ $YH _1RUFR &D
 _______ Fax:


 _____
_____________________________________
Contact Person: _ ,YDQ 0DUWLQH]____________________ No. of years in business:_ ___ Is the firm currently certified as a DBE under 49 CFR Part 26? YES NO Type of work/services/materials provided by firm? ,UULJDWLRQ DQG ODQGVFDSH ZRUN _ What was your firm’s Gross Annual receipts for last year? Less than $1 Million
Less than $5 Million
Less than $10 Million
Less than $15 Million
More than $15 Million
This form can be duplicated if necessary to report all bidders (DBE subcontractors, non-DBE subcontractors and/or suppliers’ information).

3. Bidder's Initials

Project and Specification No. 25-07

P-5a BIDDERS LIST

CITY OF COSTA MESA BIDDERS LIST

All bidders/proposers are required to provide the following information for all DBE and non-DBE subcontractors and suppliers, who provided a pr oposal, bid, quote, or were contacted by the proposed prime. This information is also required from the proposed prime contractor, and must be submitted with their bid/proposal. City of Costa Mesa will use this information to maintain and update a “Bidders List” to assist in evaluating the level of DBE participation on all Public Works projects. To the extent permitted by law, all information submitted will be held in confidence.

If Bidders List information is not submitted with the bid, it shall be submitted to the City of Costa Mesa, Construction Management Division, 77 Fair Drive, Costa Mesa, CA 92626, no later than 4:00 p.m. on the fourth day, not including Satu rdays, Sundays and legal holidays, following the bid opening. Bidders List information sent by U.S. Postal Service certified mail with return receipt and certificate of mailing and mailed on or before the third day, not including Saturdays, Sundays and legal holidays, following bid opening will be accepted even if it is received after the fourth day following bid opening. Failure to submit the required Bidders List information by the time specified will be grounds for finding the bid or proposal non-responsive.

Firm Name: ___________________________________ Phone: _________________

Address: _____________________________________ Fax: _________________

_____________________________________

Contact Person: _______________________________ No. of years in business:____

Is the firm currently certified as a DBE under 49 CFR Part 26?

YES NO

Type of work/services/materials provided by firm? __________________________________

What was your firm’s Gross Annual receipts for last year?

Less than $1 Million
Less than $5 Million
Less than $10 Million
Less than $15 Million
More than $15 Million

This form can be duplicated if necessary to report all bidders (DBE subcontractors, non-DBE subcontractors and/or suppliers’ information).

3. Bidder's Initials
R.E. Schultz Construction, Inc 714-649-2627
1767 North Batavia Street, Orange, CA 92865 714-740-5049 Richard Schultz 27
X
Installation of play equipment