Cities Index.
Agenda packet

Costa Mesa City Council
August 4, 2026

Document
Agenda packet
Meeting
August 4, 2026
Body
Costa Mesa City Council
Pages
67
Original file
42.2 MB
Text extracted from the city's file for reading and search. Open the original on costamesa.legistar.com. That file is the official record.

Company Name:

Telephone Number:

Contact Name:

Contract Amount:

Email:

Address:

Brief Contract Description:

Conduent/LA Metro
(818) 858-2192
Michael Decano
$8,500,000
[email protected]
2277 E 220th St, Carson, CA 90810
C2PM supports the I-105 ExpressLanes Roadside Toll Collection System (RTCS) Project, a major LACMTA technology and transportation infrastructure initiative involving the deployment of a complete roadside toll collection system along the I-105 ExpressLanes corridor. C2PM’s scope includes providing skilled electrical and systems installation personnel, field installation execution, warehouse operations, procurement and logistics management, equipment assembly and configuration, quality validation, burn-in testing, installation testing, commissioning support, and milestone-based deployment across multiple freeway segments. The work includes tolling equipment and roadside systems such as LPR cameras, AVI antennas, LiDAR scanners, detection loops, electronics cabinets, UPS cabinets, Zone Controller cabinets, DMS cabinets, power and communications infrastructure, cabling, routing, labeling, and terminations. This experience is directly relevant to Costa Mesa’s signal modernization project because it demonstrates C2PM’s ability to manage complex electrical/systems infrastructure, coordinate field work in active traffic environments, maintain strict documentation and quality controls, support commissioning and operational acceptance, and deliver technology-based transportation improvements through structured sequencing, logistics coordination, and reliable field execution. 26 820
821

DISCLOSURE OF GOVERNMENT POSITIONS
Each Proposer shall disclose below whether any owner or employee of Contractor currently hold positions as elected or appointed officials, directors, officers, or employees of a governmental entity or held such positions in the past twelve months. List below or state "None." None. Not applicable.
28 822

DISQUALIFICATION QUESTIONNAIRE
The Contractor shall complete the following questionnaire:

Has the Contractor, any officer of the Contractor, or any employee of the Contractor who has proprietary interest in the Contractor, ever been disqualified, removed, or otherwise prevented from bidding on, or completing a federal, state, or local government project because of a violation of law or safety regulation?
Yes No X
If the answer is yes, explain the circumstances in the following space. 29 823
824
825
826

EXHIBIT C
CONSUL
TANT’S COST PROPOSAL
827
828
829
830
831
832

EXHIBIT D

CITY COUNCI
L POLICY 100-5
833

EXHIBIT E
ARTIC

LE XXXI TITLE VI ASSURANCES

APPENDICES
A – E OF THE TILTLE VI ASSURANCES
834

EXHIBIT F
ARTICL

E III STATEMENT OF WORK
835

EXHIBIT G
ARTIC

LE IV PERFORMANCE PERIOD
836

EXHIBIT H

ARTICLE V ALLOWABLE COSTS AND PAYMENTS
837

EXHIBIT I

ARTICLE VII COST PRINCIPLES AND ADMINISTRATIVE REQUIREMENTS

838

EXHIBIT J

ARTICLE X SUBCONTRACTING

839

EXHIBIT K

ARTICLE XI EQUIPMENT PURCHASE AND OTHER CAPITAL EXPENDITURES

840

EXHIBIT L

ARTICLE XII STATE PREVAILING WAGE RATES

841

EXHIBIT M

ARTICLE XIII CONFLICT OF INTEREST

842

EXHIBIT N

ARTICLE XIV REBATES, KICKBACKS OR OTHER UNLAWFUL CONSIDERATION

843

EXHIBIT O

ARTICLE XV PROHIBITION OF EXPENDING

LOCAL AGENCY, STATE, OR FEDERAL FUNDS FOR LOBBYING

844

EXHIBIT P

ARTICLE XVI NON-DISCRIMINATION CLAUSE AND STATEMENT OF COMPLIANCE

845

EXHIBIT Q

ARTICLE XVII DEBARMENT AND SUSPENSION CERTIFICATION

846

EXHIBIT R

ARTICLE XX FUNDING REQUIREMENTS

847

EXHIBIT S

ARTICLE XXI CHANGE IN TERMS

848

EXHIBIT T

ARTICLE XXIII DISPUTES
849

EXHIBIT U

ARTICLE XXIV INSPECTION OF WORK

850

EXHIBIT V

ARTICLE XXV SAFETY

851

EXHIBIT W

ARTICLE XXXIII CONTRACT

852

CITY OF COSTA MESA
Agenda Report
77 Fair Drive
Costa Mesa, CA 92626
File #: 26-351 Meeting Date: 8/4/2026
TITLE:

AMENDMENT TO THE PROFESSIONAL SERVICES AGREEMENT FOR THE CONSTRUCTION

MANAGEMENT AND INSPECTION SUPPORT SERVICES FOR THE ADAMS AVENUE BICYCLE

FACILITY PROJECT (FROM HARBOR BOULEVARD TO FAIRVIEW ROAD), FEDERAL PROJECT NO. STPL-5312(108), CITY PROJECT NO. 25-11
DEPARTMENT: PUBLIC WORKS DEPARTMENT/TRANSPORTATION SERVICES

DIVISION
PRESENTED BY: RAJA SETHURAMAN, PUBLIC WORKS DIRECTOR
CONTACT INFORMATION: PAUL MARTIN, TRANSPORTATION SERVICES MANAGER, AND RAMIN NIKOUI, SENIOR ENGINEER, (714) 754-5343
RECOMMENDATION:

Staff recommends the City Council:

1. Approve an amendment to the Professional Services Agreement (PSA) to increase the compensation amount by $64,132.15 for a new not-to-exceed (NTE) compensation amount of $305,506.15 with Z&K Consultants, Inc., 17130 Van Buren Blvd. #122, Riverside, CA 92504, for construction management and inspection support services for the Adams Avenue Bicycle Facility Project.

2. Authorize the City Attorney to prepare the Amendment and the City Manager and the City Clerk to execute the Amendment and any future amendments to the agreements within Council authorized limits.

BACKGROUND:

The Adams Avenue Bicycle Facility Project (From Harbor Boulevard to Fairview Road), Federal Project No. STPL-5312(108), City Project No. 25-11 (Project), is an ongoing federally funded project that seeks to improve traveler accessibility and safety.

The Project narrows the raised center medians to provide enhanced bicycle facilities without reducing the number of vehicular lanes along Adams Avenue. From Harbor Boulevard to Pinecreek Drive, the project is constructing new protected Cycle Track bikeways on both sides of Adams Avenue. From Pinecreek Drive to Fairview Road, the project will provide a new Cycle Track along eastbound Adams Avenue, and a new Class II Buffered Bike Lane along westbound Adams Avenue adjacent to existing on-street parking. The Project includes slurry seal, new landscaping and irrigation, new streetlighting, green bicycle markings, and traffic signal and bikeway modifications at the intersection of Adams Avenue and Fairview Road.

Page 1 of 4 ends

853
File #: 26-351 Meeting Date: 8/4/2026
The new bicycle facilities will connect to the City’saward-winning multi-use bicycle and pedestrian pathways constructed at the intersection of Adams Avenue and Pinecreek Drive that finished construction in May 2025. These upcoming improvements will create a continuous low-stress bikeway from Harbor Boulevard to Fairview Road and will improve mobility and connectivity to Orange Coast College (OCC) and the surrounding neighborhoods. The barrier separated bikeways provide a safer space for bicyclists, and also further separate motorist traffic from pedestrians walking along the sidewalks.

On December 2, 2025, the City Council awarded a Public Works Agreement to Excel Paving Company for construction of the improvements in the amount of $2,268,636, as well as a Public Services Agreement to Z&K Consultants, Inc. (Z&K) for construction management and inspection services, in the amount of $241,374. The Project began construction in February 2026 with a construction duration of ninety (90) working days.

ANALYSIS:

The construction of the improvements on Adams Avenue from Harbor Boulevard to Fairview Road began on February 9, 2026. The Project is well underway and is anticipated to be completed by September 2026.

During construction, there was a need for additional construction management and inspection support services beyond the original scope of the project as well as additional working days approved beyond the ninety (90) working days due to the following reasons:
· During excavation, the current below ground soil was identified to be a poor mix that retains excess water and is unsuitable as a structural base for the new asphalt serving motor vehicles. After unsuccessful attempts to treat the soil, the soil was required to be removed, and additional excavation work and compaction testing were required. · The existing soil in the landscaped medians was also found to be unsuitable for sustaining health and vibrancy for newly planted trees and shrubs. The existing soil contained high concentrations of heavy metals and had poor characteristics (drainage, acidity, etc.). To ensure successful growth of the new landscaping, the Project required additional soil removal and replacement with high-quality topsoil.
· During the Project, City Staff identified an opportunity to upgrade the Cycle Track vertical separation from plastic bollards to extruded concrete curbs within the existing construction budget and federal grant. The installation utilized the time-saving machine that was initially utilized for the construction of the center medians. The extruded concrete curbs provide a lower-stress bicycle facility with more continuous and hardened separation between motorists and bicyclists. The curbs also further separate motor vehicle traffic from pedestrians walking along the sidewalk. The extruded curb separation between motorists and cyclists aligns with industry best-practices for bikeway design and provides a demonstration of concept within the City of Costa Mesa following similar treatments in Irvine, Yorba Linda, Westminster, San Clemente, Long Beach, and Santa Ana.
· To effectively manage traffic during the construction along Adams Avenue, the project was separated into multiple phases of work which resulted in more complicated traffic control and an increase of materials testing services required for the project.

Page 2 of 4 ends

854
File #: 26-351 Meeting Date: 8/4/2026
The above issues and additional work will require the construction duration to be extended by an additional twenty (20) working days for a total duration of one-hundred and ten (110) working days.

Due to the above delays caused by unforeseen issues that have arisen during construction, as well as scheduling of project enhancements, the contract with Z&K will need to be increased by $64,132.15 to continue the construction management and inspection services. The additional budget will secure construction management support to deliver project through completion while satisfying the federal grant-required monitoring and tracking. As the increase in the contract with Z&K exceeds 10 percent, City Council approval of the amendment is requested. Funding for this increase is available in the project budget.

There will be no amendment to the construction contract for Excel Paving to complete their construction activities.

ALTERNATIVES:

The City Council could choose not to approve the amendment to the PSA and direct City Staff to conduct the construction management and inspection services in-house. Federally funded projects require inspectors to visit the project site daily and track hours of construction staff, create daily logs of activity and resources utilized, conduct labor compliance investigations, as well as attest to hours of the construction staff. However, this alternative to utilize City staff for remaining construction management and inspection services is not recommended due to the complexity of managing federally funded projects and the limited available City staff resources and time.

FISCAL REVIEW:

Funding for the PSA amendment is available in the project budget, consisting of Traffic Impact Fee (TIF) (Fund 214) with an available budget of approximately $500,000 and Regional Measure “M2” Fairshare (Fund 416) with an available budget of approximately $100,000.

LEGAL REVIEW:

The City Attorney’s Office has reviewed this agenda report and approves it as to form. The Amendment to the PSA will be drafted following City Council approval and executed thereafter.

CITY COUNCIL GOALS AND PRIORITIES:

This project works toward achieving the following City Council goals:
· Strengthen the Public’s Safety and Improve the Quality of Life. · Maintain and enhance the City’s facilities, equipment, and technology. · Advance environmental sustainability and climate resiliency.

Page 3 of 4 ends

855
File #: 26-351 Meeting Date: 8/4/2026
CONCLUSION:

Staff recommends the City Council:

1. Approve an amendment to the Professional Services Agreement (PSA) to increase the compensation amount by $64,132.15 for a new not-to-exceed (NTE) compensation amount of $305,506.15 with Z&K Consultants, Inc., 17130 Van Buren Blvd. #122, Riverside, CA 92504, for construction management and inspection support services for the Adams Avenue Bicycle Facility Project.

2. Authorize the City Attorney to prepare the Amendment and the City Manager and the City Clerk to execute the Amendment and any future amendments to the agreements within Council authorized limits.

Page 4 of 4 ends

856

← All documents from this meeting