CITY OF COSTA MESA

PUBLIC WORKS DEPARTMENT
ON CALL SIDEWALK REPAIR PROJECT, #25-20
BID OPENING DATE: MAY 6, 2026

BID UNIT UNIT UNIT UNIT
NO. QUANTITY DESCRIPTION PRICE TOTAL PRICE TOTAL PRICE TOTAL PRICE TOTAL PRICE TOTAL 1 1 LS MOBILIZATION (5% MAXIMUM) $10,000.00 $10,000.00 $4,000.00 $4,000.00 $12,100.00 $12,100.00 $800.00 $800.00 $12,525.00 $12,525.00 2 1 LS TRAFFIC & PEDESTRIAN CONTROL $5,000.00 $5,000.00 $3,000.00 $3,000.00 $13,038.00 $13,038.00 $800.00 $800.00 $44,000.00 $44,000.00 3 6,000 SF

REMOVE & RECONSTRUCT CONCRETE SIDEWALK
(4-INCH CONCRETE OVER 4-INCH C.M.B)

INCLUDING ADA RAMPS
$21.50 $129,000.00 $20.00 $120,000.00 $22.00 $132,000.00 $16.00 $96,000.00 $30.00 $180,000.00 4 140 LF REMOVE EXISITING AND RECONSTRUCT C-6 CURB
& GUTTER OVER 6” CMB WITH 2’ A.C. SLOT PAVE $145.00 $20,300.00 $250.00 $35,000.00 $124.00 $17,360.00 $100.00 $14,000.00 $125.00 $17,500.00 5 75 LF REMOVE EXISITING AND RECONSTRUCT C-8 CURB
& GUTTER OVER 6” CMB WITH 2’ A.C. SLOT PAVE $160.00 $12,000.00 $300.00 $22,500.00 $132.00 $9,900.00 $100.00 $7,500.00 $205.00 $15,375.00 6 760 SF
REMOVE & RECONSTRUCT P.C.C. CROSS-GUTTER,
SPANDREL,LOCAL DEPRESSION, AND P.C.C. PAD
(8" CONCRETE OVER 8" C.M.B.) WITH 3' A.C. SLOT
PAVE
$51.00 $38,760.00 $30.00 $22,800.00 $50.00 $38,000.00 $32.00 $24,320.00 $55.00 $41,800.00 7 650 SF
REMOVE EXISITING AND RECONSTRUCT P.C.C.

DRIVEWAY APPROACH (6-INCH CONCRETE OVER 6-
INCH C.M.B.)
$31.00 $20,150.00 $20.00 $13,000.00 $28.00 $18,200.00 $18.50 $12,025.00 $40.00 $26,000.00 8 640 LF INSTALL ROOT BARRIERS $125.00 $80,000.00 $20.00 $12,800.00 $26.00 $16,640.00 $175.00 $112,000.00 $120.00 $76,800.00 9 3 EA INSTALL TRUNCATED DOMES (ADA RAMPS) $985.00 $2,955.00 $1,500.00 $4,500.00 $1,084.00 $3,252.00 $900.00 $2,700.00 $1,000.00 $3,000.00 PROJECT BASE BID TOTAL: $318,165.00 $237,600.00 $260,490.00 $270,145.00 $417,000.00

BID UNIT UNIT
NO. QUANTITY DESCRIPTION PRICE TOTAL PRICE TOTAL PRICE TOTAL 1 1 LS MOBILIZATION (5% MAXIMUM) $10,000.00 $10,000.00 $9,500.00 $9,500.00 $7,785.00 $7,785.00 2 1 LS TRAFFIC & PEDESTRIAN CONTROL $5,000.00 $5,000.00 $15,000.00 $15,000.00 $15,167.60 $15,167.60 3 6,000 SF

REMOVE & RECONSTRUCT CONCRETE SIDEWALK
(4-INCH CONCRETE OVER 4-INCH C.M.B)

INCLUDING ADA RAMPS
$21.50 $129,000.00 $54.00 $324,000.00 $28.40 $170,400.00 4 140 LF REMOVE EXISITING AND RECONSTRUCT C-6 CURB
& GUTTER OVER 6” CMB WITH 2’ A.C. SLOT PAVE $145.00 $20,300.00 $230.00 $32,200.00 $165.80 $23,212.00 5 75 LF REMOVE EXISITING AND RECONSTRUCT C-8 CURB
& GUTTER OVER 6” CMB WITH 2’ A.C. SLOT PAVE $160.00 $12,000.00 $250.00 $18,750.00 $197.40 $14,805.00 6 760 SF
REMOVE & RECONSTRUCT P.C.C. CROSS-GUTTER,
SPANDREL,LOCAL DEPRESSION, AND P.C.C. PAD
(8" CONCRETE OVER 8" C.M.B.) WITH 3' A.C. SLOT
PAVE
$51.00 $38,760.00 $98.00 $74,480.00 $53.00 $40,280.00
7 650 SF
REMOVE EXISITING AND RECONSTRUCT P.C.C.

DRIVEWAY APPROACH (6-INCH CONCRETE OVER 6-
INCH C.M.B.)
$31.00 $20,150.00 $80.00 $52,000.00 $37.30 $24,245.00
8 640 LF INSTALL ROOT BARRIERS $125.00 $80,000.00 $150.00 $96,000.00 $98.20 $62,848.00 9 3 EA INSTALL TRUNCATED DOMES (ADA RAMPS) $985.00 $2,955.00 $3,500.00 $10,500.00 $1,596.80 $4,790.40 PROJECT BASE BID TOTAL: $318,165.00 $632,430.00 $363,533.00

AVERAGE

3. CJ CONCRETE
CONSTRUCTION, INC.

2. GENTRY GENERAL
ENGINEERING, INC.

COLTON SANTA FE SPRINGS
UNIT

BASE BID CITY ESTIMATE LAKE FOREST

5. HARDY AND HARPER, INC.

UNIT

CITY ESTIMATEBASE BID

1. S&H CIVILWORKS

COLTON YORBA LINDA

4. ONYX PAVING COMPANY,
INC.

PAGE 1 OF 1
ATTACHMENT 2