BID TABULATION SUMMARY SHEET
Pocket Park & Laguna Trail Pathway Improvements ProjectBid Opening Date: 5/4/22 Bidder #1 Bidder # 2 Bidder # 3 Bidder # 4US Engineering, Inc. Piazza Construction Schaefer Engineering, Inc. Michael Paul Company, Inc. Median Average Item # Estimated
Quantity Units Unit Price Cost Unit Price Cost Unit Price Cost Unit Price Cost Unit Price Cost Unit Price Cost Base BidPocket Park Items
1. Mobilization 1 LS 5,500.00 5,500.00 1,600.00 1,600.00 4,800.00 4,800.00 10,000.00 10,000.00 5,150.00 $ 5,150.00 $ 5,475.00 $ 5,475.00 $
2. Traffic Control and Construction Area Signs 1 LS 2,500.00 2,500.00 1,000.00 1,000.00 4,000.00 4,000.00 5,000.00 5,000.00 3,250.00 $ 3,250.00 $ 3,125.00 $ 3,125.00 $
3. Pathway Preparation 1,040 SF 10.00 10,400.00 13.00 13,520.00 16.00 16,640.00 20.00 20,800.00 14.50 $ 15,080.00 $ 14.75 $ 15,340.00 $
4. Pathway Edging 400 LF 22.00 8,800.00 32.00 12,800.00 18.25 7,300.00 15.00 6,000.00 20.13 $ 8,050.00 $ 21.81 $ 8,725.00 $
5. Aggregate Base 20 TON 250.00 5,000.00 525.00 10,500.00 275.00 5,500.00 50.00 1,000.00 262.50 $ 5,250.00 $ 275.00 $ 5,500.00 $
6. Pathway Surface Paving 1,040 SF 12.00 12,480.00 21.00 21,840.00 18.00 18,720.00 45.00 46,800.00 19.50 $ 20,280.00 $ 24.00 $ 24,960.00 $
7. Benches 2 EA 1,000.00 2,000.00 5,440.00 10,880.00 5,750.00 11,500.00 3,000.00 6,000.00 4,220.00 $ 8,440.00 $ 3,797.50 $ 7,595.00 $
8. Lighted Bollards, Including Conduit, Wiring & Pull Box 5 EA 1,200.00 6,000.00 6,940.00 34,700.00 5,600.00 28,000.00 2,000.00 10,000.00 3,800.00 $ 19,000.00 $ 3,935.00 $ 19,675.00 $
9. Pull Box 1 EA 8,500.00 8,500.00 350.00 350.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 $ 1,000.00 $ 2,712.50 $ 2,712.50 $
10. Railing 1 LS 4,800.00 4,800.00 7,200.00 7,200.00 8,800.00 8,800.00 5,000.00 5,000.00 6,100.00 $ 6,100.00 $ 6,450.00 $ 6,450.00 $
11. Drinking Fountain 1 EA 3,200.00 3,200.00 19,285.00 19,285.00 12,000.00 12,000.00 3,000.00 3,000.00 7,600.00 $ 7,600.00 $ 9,371.25 $ 9,371.25 $
12. Irrigation Header, Including Control Wire and Valve Boxes 1 LS 3,500.00 3,500.00 5,200.00 5,200.00 10,200.00 10,200.00 2,000.00 2,000.00 4,350.00 $ 4,350.00 $ 5,225.00 $ 5,225.00 $
13. Backflow Assembly 1 EA 3,200.00 3,200.00 5,600.00 5,600.00 1,500.00 1,500.00 2,000.00 2,000.00 2,600.00 $ 2,600.00 $ 3,075.00 $ 3,075.00 $ Subtotal 75,880.00 Subtotal 144,475.00 Subtotal 129,960.00 Subtotal 118,600.00 Subtotal 106,150.00 Subtotal 117,228.75 Laguna Trail Pathway Items14. Mobilization 1 LS 5,500.00 5,500.00 1,600.00 1,600.00 3,000.00 3,000.00 10,000.00 10,000.00 4,250.00 $ 4,250.00 $ 5,025.00 $ 5,025.00 $
15. Traffic Control and Construction Area Signs 1 LS 2,500.00 2,500.00 1,000.00 1,000.00 2,500.00 2,500.00 5,000.00 5,000.00 2,500.00 $ 2,500.00 $ 2,750.00 $ 2,750.00 $
16. Pathway Removal & Preparation 1,765 SF 10.00 17,650.00 10.00 17,650.00 6.50 11,472.50 45.00 79,425.00 10.00 $ 17,650.00 $ 17.88 $ 31,549.38 $
17. Pathway Edging 500 LF 22.00 11,000.00 24.00 12,000.00 14.00 7,000.00 10.00 5,000.00 18.00 $ 9,000.00 $ 17.50 $ 8,750.00 $
18. Aggregate Base 34 TON 250.00 8,500.00 338.00 11,492.00 180.00 6,120.00 45.00 1,530.00 215.00 $ 7,310.00 $ 203.25 $ 6,910.50 $
19. Pathway Surface Paving 1,765 SF 22.00 38,830.00 15.00 26,475.00 16.00 28,240.00 20.00 35,300.00 18.00 $ 31,770.00 $ 18.25 $ 32,211.25 $
20. Minor Concrete: ADA Curb Ramp 1 EA 2,900.00 2,900.00 12,868.00 12,868.00 7,500.00 7,500.00 1,000.00 1,000.00 5,200.00 $ 5,200.00 $ 6,067.00 $ 6,067.00 $
21. Adjust Utility Boxes to Grade 2 EA 500.00 1,000.00 250.00 500.00 400.00 800.00 500.00 1,000.00 450.00 $ 900.00 $ 412.50 $ 825.00 $ Subtotal 87,880.00 Subtotal 83,585.00 Subtotal 66,632.50 Subtotal 138,255.00 Subtotal 78,580.00 Subtotal 94,088.13 $ 228,060.00 163,760.00 $ 196,592.50 $ 256,855.00 $ 184,730.00 $ 211,316.88 $