9 June 2022
Mr. Craig A. Scott, Public Works Director/City Engineer City of Cotati
201 West Sierra Avenue
Cotati, CA 94931
RE: Downtown and Civic Center Connectivity and Safety Project Design and Environmental Services – Amendment No. 3
Dear Craig:
GHD is pleased to provide this proposed scope of work amendment to our existing agreement for the Downtown and Civic Center Connectivity and Safety Project (aka “Quick Strike Project”) (Project).
Project Understanding
GHD will work with our subconsultant, Anthropological Studies Center (ASC) of Sonoma State University, to complete the work outlined in this project understanding, including project management, document review, coordination and assistance with completing the NEPA documentation.
Caltrans Local Assistance has requested that the project team complete an Extended Phase I study of Native American archaeological resource P-49-000952 to determine the presence or absence of the site within the project APE. The archaeological study is being conducted to satisfy National Environmental Policy Act (NEPA) requirements for the project federal funding.
Caltrans’ programmatic Section 106 agreement requires an Extended Phase I (XPI) study be conducted at the location of P-49-000952, based on the results of the archaeological survey conducted in April 2022. This process requires a XPI proposal be approved by Caltrans prior to fieldwork. The XPI will consist of 4 to 6 auger test units within the site as close to the road prism as feasible. Augers will be collected using a 4-inch diameter auger to a depth 20 cm below vertical impact. Soil will be screened through a ¼-inch mesh screen to separate any cultural material. All auger units will be backfilled. No cultural material will be collected; any identifiable cultural material will be redeposited in the unit from which it was excavated. Following the XPI testing, a report (XPIR) will be completed detailing the methods and findings of the study.
If the site is determined to be present within the APE, further consultation with Caltrans will be required. If, in consultation with Caltrans, it is determined that the proposed project activities will require an Environmentally Sensitive Area-Action Plan (ESA-AP), then such a plan will be developed by ASC and approved by Caltrans for use during construction activities. The in-progress HPSR will be finalized following the XPIR review, as well as the Finding of No Adverse Effect (FONEA) letter for this project.
Please note that the XPI study will not evaluate either the National Register of Historic Places (NRHP) nor the California Register of Historic Places (CPHR) eligibility of significance for any cultural resources that may be identified.
If the site is determined to be present within the APE and will likely be affected by proposed project activities, Caltrans may require additional work outside of this scope.
The Power of Commitment
11198599 | RE: Downtown and Civic Center Connectivity and Safety Project Design and Environmental Services – Amendment No. 3 2 Our scope of work and fee is outlined below for your consideration:
Scope of Work
Task 1 - Project Management, Coordination and QA/QC
Additional work in this task includes project administration, coordination and quality control as stated in the following sub-sections:
Task 1.1 Internal Coordination and Administration
• Provide project and contract modification, sub-consultant agreements and tracking.
Task 1.2 Project Review Meetings (no additional work)
Task 1.3 QA/QC
Prior to being submitted to the City for review, all deliverables will be reviewed by a senior staff member(s) for QA/QC.
Task 2 – Environmental Documentation
This task includes completion of additional technical studies for the project’s NEPA review.
Task 2.1 Caltrans NEPA Documentation for Federal-Aid Funding Tribal Consultation – GHD and ASC will conduct updated Native American consultation by preparing updated consultation letters on City of Cotati letterhead and submitting to the City for signature. Following signatures, GHD and ASC will submit the updated consultation letters to application Native American Tribes along with the project APE Maps and a partial plan set.
Undertake Fieldwork – ASC will prepare an Extended Phase 1 proposal (XPIP) for Caltrans review and approval prior to undertaking fieldwork. Upon approval of the XPIP, ASC will perform archaeological subsurface testing within P-49-000952 to determine presence/absence in the APE.
Prepare Reports – ASC will prepare the Extended Phase I Proposal (XPIP). Following the fieldwork, ASC will prepare an Extended Phase I Report (XPIR), and if needed, an Environmentally Sensitive Area-Action Plan (ESA-AP). ASC will also update the HPSR and prepare an updated Finding of No Adverse Effect (FONAE) letter for the project.
Assumptions
• Mapping will be provided by GHD.
• Updated consulation letters will be signed by City of Cotati. • One review and final approval of the Extended Phase I Proposal is assumed by GHD, City of Cotati, and Caltrans.
• One review of the XPI Report is assumed by GHD, City of Cotati and Caltrans. • Cultural resources will be recorded at an additional cost of $600 per resource.
The Power of Commitment
11198599 | RE: Downtown and Civic Center Connectivity and Safety Project Design and Environmental Services – Amendment No. 3 3 Fee Estimate
The estimated fee for professional services included in this amendment proposal is $24,727 A summary of the contract budget amount with amendment is shown in Table 1, below. See attachment for breakdown of the estimated fee.
Table 1: Project Budget Summary
Original Contract Amount $87,349
Contract Amendment No. 1 – additional
design scope $27,009
Contract Amendment No. 2 – additional
environmental/NEPA scope $16,272
Contract Amendment No. 3 – additional
environmental/NEPA scope $24,727
Total Contract Amount with Amendment $155,357
Closing
It is assumed that upon agreement of the scope of work for these professional services, the City will issue an amendment to our existing agreement for this work.
If you have any questions or comments regarding this proposal, please feel free to call me at 540-9689.
Sincerely,
GHD Inc.
Matt Wargula, P.E., T.E.
Project Manager | A GHD Associate
(707) 540-9689
Attachment: Fee Estimate Spreadsheet
Preliminary Schedule
Project Name: Downtown and Civic Center Connectivity and Safety Project Design and Environmental Services - Amendment No. 3 Client:
Prepared by: B. Bacciarini Date:Reviewed by: M. WargulaJob Number: 11198599.00 LABOR CATEGORY > Project Project
Engineer Coord.
RATE > $225 $220 $160 $200 $160 $175 $220 $210 $180 $160 $140 $150 Task / Item /Hr /Hr /Hr /Hr /Hr /Hr /Hr /Hr /Hr /Hr /Hr /Hr 22 2 6 $39 $779
0 $0 $0
24 6 $39 $479
0 4 0 6 0 0 0 0 0 0 0 2 12 $78 $0 $1,258
2 14 16 $104 $20,125 $23,469
SUBTOTAL TASK 2 0 2 0 14 0 0 0 0 0 0 0 0 16 $104 $20,125 $23,469SUBTOTAL TASK 3 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 $0 $0SUBTOTAL TASK 4 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 $0 $0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 $0 $00 0 0 0 0 0 0 0 0 0 0 0 0 $0 $0 $00 0 0 0 0 0 0 0 0 0 0 0 0 $0 $0 $000 0 0 0 0 $0 $00 0 0 0 0 0 0 0 0 0 0 0 0 $0 $0 $0 PROJECT TOTALS 0 6 0 20 0 0 0 0 0 0 0 2 28 $182 $20,125 $24,727 Task 1 - Project Management, Environmental Review, and CoordinationTask 2 - Environmental DocumentationTask 3 - Right of Way Documentation (no additional work) SUBTOTAL TASK 6
EXHIBIT B - PROJECT FEE ESTIMATING SHEET
LABOR COSTS
2.1 Caltrans NEPA Documentation for Federal-Aid Funding City of Cotati
SUBTOTAL TASK 1
*OTHER
DIRECT
COSTS
1.1 Project Management, Coordination and QA/QC
June 9, 2022
FEE COMPUTATION
TOTAL FEE Sub- Consultants
1.3 QA/QC
Task 7 - Construction Management and Inspection (future work/agreement)ContingencyTask 4 - Final Design (Pre-Final Update and Final) (no additional work)
CONTINGENCY
SUBTOTAL TASK 5SUBTOTAL TASK 7
Task 6 - Engineering Support during Construction (future work/agreement) Sr. Enviro
Planner
Enviro
Planner
Senior
Electrical Eng.
1.2 Project Review Meetings
Task 5 - Project Advertisement and Bid Phase Services (no additional work) Project
Manager
Proj. Dir. /
QA/QC
Staff Elect
Engineer TOTAL
HOURS
Resident
Engineer
Constrution
Inspector
CAD /
Graphics PA
6/9/2022 Page 1