Electric Vehicle
Charging Reach Code
Ordinance
Cotati City Council
Community Development
Department
June 13, 2023
Background
 CA Building Code Updated 2022 (Triennial, 2023-2025)
 Cotati adopted Tier 1 of CALGreen code for EV
charging
 Intervening Code update of CA Building Code = higher
mandatory, Tier 1, and Tier 2 standards effective
7/1/2024
 Council workshop in April on reach codes: Council
direction to pursue Intervening Code Tier 1 on EV
charging ASAP
 Reach code related to all-electric buildings on hold
pending resolution of legal issues
Cotati’s 2022 Code vs. Intervening Code
Tier 1 (Proposed Reach Code)
New single family/duplex
No change
One space must be Level 2
EV Ready
Applies to ADUs (although
most are parking-exempt)
Cotati’s 2022 Code vs. Intervening Code Tier 1
(Proposed Reach Code): Multifamily/Hotels
 Existing MF—10% added/altered parking spaces—Level 2 EV Capable (also when electrical systems or lighting altered)
Size Measure CALGreen CALGreen Voluntary
Existing 2022 Code Mandatory Tier 1 Tier 2
Small (<20 units)
Level 2 EV Capable 10%
Low Power Level 2
Receptacles 25% 35% 40%
Large (> 20 units)
Level 2 EV Capable 10%
Low Power Level 2
Receptacles 25% 35% 40%
Level 2 EVSE 5% 10% 15%
Proposed Intervening Code Mandatory Tier 1 Tier 2
All sizes
Low Power Level 2
Receptacles 40% 50% 55%
Level 2 EVSE 15% 15% 20%
Cotati’s 2022 Code vs. Intervening Code
Tier 1 (Proposed Reach Code)
Non-Residential
 New buildings
 EV Capable: Minimum 2 spaces
 EVSE: Minimum 1 space (New)
 New: Charging for medium- and heavyduty EVs extended to manufacturing facilities, office buildings
 Existing Buildings
 New: 10% of added/altered parking
spaces must be Level 2 EV Capable
(also when electrical systems or
lighting altered, or PVs added)

TOTAL NUMBER OF

ACTUAL PARKING
SPACES
TIER 1 NUMBER OF REQUIRED

EV CAPABLE SPACES
TIER 1 NUMBER OF EVCS (EV

CAPABLE SPACES PROVIDED

WITH EVSE)
0-9 2 0
10-25 5 2
26-50 11 4
51-75 19 6
76-100 26 9
101-150 38 13
151-200 53 18
201 and over 30 percent of actual parking
spaces
33 percent of EV capable
spaces
TABLE A5.106.5.3.1
Tier 1 Standards for Non-Residential
Adoption Process
 If adopted, reach code filed with CA Building
Standards Commission (BSC)
 Effective date the later of 1) Filing with BSC or
2) 30 days following adoption
 Reach code needs to be re-adopted with triennial
update of CA Building Code in 2025 (for
1/1/2026)
 New mandatory measures from State or
additional voluntary measures may be adopted
Recommendation
The Community Development
Department recommends that the City
Council hold a public hearing and
introduce an ordinance amending the
City’s Building Code to require
increased electric vehicle charging
infrastructure and equipment in
building projects.