C
O
TA
TI H
O
T
E
L
IM
P
R
O
V
E
M
E
N
T
P
L
A
N
S
1 4
7 S
T. J
O
S
E
P
H
W
AY
C
O
TA
TI, C
A
DATE: MLA JOB #: SCALE: DRAWN:
2022-04
1" = 20' DM
L13
SHEET L13 OF 19
SIT
E
P
L
A
N
7/17/23
C2023 MACNAIR LANDSCAPE ARCHITECTURE, NOT FOR GENERAL USE OR PUBLICATION, ALL RIGHTS RESERVED. THESE DRAWINGS AND SPECIFICATIONS ARE THE PROPERTY OF MACNAIR LANDSCAPE ARCHITECTURE. MACNAIR
LANDSCAPE ARCHITECTURE IS NOT RESPONSIBLE FOR THE ACCURACY OF ANY PLANS OR SURVEYS NOT DIRECTLY PREPARED BY THEM. SITE DIMENSIONS, GRADES, WATER
PRESSURES AND GENERAL CONDITIONS SHALL BE VERIFIED
PRIOR TO BEGINNING OF ANY WORK ON SITE. WRITTEN
DIMENSIONS SHALL TAKE PRECEDENCE OVER SCALED
DIMENSIONS.
L A N D S C A P E
A R C H I T E C T U R E
P O S T O F F IC E B O X 2 5 1
K E N W O O D , C A L I F O R NIA 9 5 4 5 2
TEL (707) 833-2288
RLA #2800
[email protected]
MACNAIR
A
P
N
#
0 4
3 -13
4 -
0 2
0 NO. 2800
EXP. 8/31/25
2 2-0
4 C
otati Base 07012
3.vwx
REV NO. DATE DESCRIPTION
9'-4"
6" 1'-8" 6" 4'-0" 6" 1'-8" 6"
5'-6"
6"
9'-4"
6"
6"
7 1/4"
6" 1 1/4"
6"
Notes
1. 2.
3. 4.
5. 6.
7. 8. 9.
10. 11.
12. 13.
14. 15.
7-1/4" WIDE X 12" DEEP FLUSH CONCRETE
CURB; NOTCH FOR TREE GRATE; MATCH
ADJACENT COLOR AND FINISH
6" WIDE X 12" DEEP FLUSH CONCRETE PAVER
CONTAINMENT CURB; MATCH ADJACENT
COLOR AND FINISH
4' SQUARE TREE WELL WITH URBAN
ACCESSORIES "CHINOOK" TREE GRATE. REFER
TO CITY OF COTATI STANDARD DETAIL #602. 6" CONCRETE CURB, REFER TO CIVIL
DRAWINGS
"HYDRO-FLO PLAZA PAVER", 15.875" X 7.875" X 2.75"; AS MANUFACTURED BY PACIFIC INTERLOCK; COLOR TBD; INSTALL IN RUNNING
BOND PATTERN, CUT AS NEEDED TO FIT. JOINT FILL AND PAVER GAP PER
MANUFACTURER
EDGE OF CITY SIDEWALK, REFER TO CIVIL
DRAWINGS
ADJACENT LANDSCAPE AREA/BIOSWALE
#4 REBAR, CONTINUOUS. OVERLAP ENDS 12"; TYPICAL
4' SQUARE TREE WELL PLANTING AREA
24" DEEP LINEAR ROOT BARRIER AT
PERIMETER OF TREE WELL; BACKFILL WITH
3/4" DRAIN ROCK BETWEEN CURB AND ROOT
BARRIER.
1-1/2" SAND LEVELING COURSE
ASTM #57 AGGREGATE BASE
ASTM #2 AGGREGATE BASE
85% COMPACTED SUBGRADE
1 2
3 4
5 7
1 2
3 5
5 8
8 9
10 11 11
12 13
14 4" 6"
15 REFER TO CIVIL DRAWING FOR DRAINLINE PLACEMENT
6 PERMEAVBLE PAVERS AT TREE WELLS
Scale: 1/2" = 1'-0"
PLAN
SECTION
4' SQUARE PER CITY
APPROVED DESIGN
DEVLOPMENT DRAWINGS
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X X X X X X X X
X
X
X
X
X
X
XX
X
X
X
X
X
X
X
X
X
X
X
ST JOSEPH WAY
GRAVENSTEIN HWY
HWY 101
(OF
RAMP)
W
6" W
10" W
6" PVT FIRE-279'
W
W
6" PVT FIRE-127' 8" W-47'
6" W-9'
6" PVT FIRE-12'
6" PVT FIRE-130'
6" PVT FIRE-53'
2" PVT DOM-91'
2" PVT DOM-266'
2" PVT DOM-58'
2" PVT DOM-120'
2" PVT DOM-22'
2" PVT DOM-23'
W W W W W W W W W W W W W W
W
W
W W W
W
W
W
W
W
W
W W W
2" PVT DOM P.O.C
6" PVT FIRE SERVICE P.O.C
2" PVT DOM P.O.C
6" PVT FIRE SERVICE P.O.C
X
X
X
X
6" SS-39'
N66°16'19"E
N51°16'57"E T
E
L
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
SD
SS
SS
T
SS
SD
SSSS
SD
SS
SD
ELEC
20-IN OAK
10+00 10+50 11+00 11+50
12+00
12+50 13+00 13+50 14+00 14+50 15+00 15+50 16+00 16+50 17+00 8+50 9+00
Δ= 14 °59'22" R= 250.00' L= 65.4 0'
7 EUG
EUG
JT JT JT JT JT JT JT JT JTJT JT JT JT JTJT JT JT JT JT JT JT JT JT JT JT
GAS GAS
GAS GAS GAS GAS GAS GAS GAS GAS
EUG EUG EUG EUG
EUG EUG
EUG EUG
TOWER
STO
R
A
GE
PERGOLA
PERGOLA
PERGOLA
VAULT
VAULT
POOL
PATIO
HOTEL
ENTRY
TOWER
MARKET PLACE
COURTYARD
STO
R
A
GE
ENTRY
PERGOLA
PATIO
PLAZA
PERGOLA
PERGOLA
TOWER
ELEMENT
BIKE RACK
POOL
PATIO
COURTYARD
PATIO
OVERALL SITE PLAN
Scale: 1"= 30'-0"
PROPOSED
STORM DRAIN
PROPOSED
WATER LINE
PROPOSED
SANITARY SEWER
PROPOSED
STREET TREES, REFER TO SHEET
L14
PROPOSED TREE
WELLS, REFER TO
DETAIL THIS SHEET
BEGIN EXISTING FENCE
TO BE REMOVED
END EXISTING FENCE
TO BE REMOVED
REFER TO LANDSCAPE
IMPROVEMENT PLAN
DRAWINGS, SHEET L14 - SHEET L16
PROPERTY LINE IS LIMIT OF
LANDSCAPE IMPROVEMENT
DRAWINGS
PROPOSED
JOINT TRENCH
PROPOSED
GAS LINE
THESE DRAWINGS COMPLY WITH THE CRITERIA OF THE ORDINANCE. ORDINANCE REQUIREMENTS HAVE BEEN APPLIED FOR THE EFFICIENT
USE OF WATER IN THE IRRIGATION DESIGN PLAN AND THE LANDSCAPE DESIGN PLAN.”
U.S.A NOTE
IT IS THE RESPONSIBILITY OF THE LANDSCAPE CONTRACTOR TO BE FAMILIAR WITH ALL GRADE DIFFERENCES, LOCATION OF WALLS, STRUCTURES, AND UTILITIES. THE IRRIGATION
CONTRACTOR SHALL EXERCISE EXTREME CARE, AND BE RESPONSIBLE FOR ANY DAMAGE IN EXCAVATING AND WORKING NEAR UTILITIES. THE LANDSCAPE CONTRACTOR SHALL
COORDINATE ALL WORK WITH THE OTHER SUB-CONTRACTORS FOR THE LOCATION OF
UTILITIES AND THE INSTALLATION OF PIPE SLEEVES THROUGH WALLS, UNDER ROADWAYS, AND NEAR STRUCTURES. PRIOR TO CONSTRUCTION, CONTACT ALL APPLICABLE AGENCIES AND U.S.A. AT 1-800-642-2444 OR 1-800-227-2600 TO FIELD LOCATE ALL EXISTING UTILITIES.
C
O
TA
TI H
O
T
E
L
IM
P
R
O
V
E
M
E
N
T
P
L
A
N
S
1 4
7 S
T. J
O
S
E
P
H
W
AY
C
O
TA
TI, C
A
DATE: MLA JOB #: SCALE: DRAWN:
2022-04
1" = 20' DM
L14
SHEET L14 OF 19
IR
RIG
A
TIO
N
P
L
A
N
S
T. J
O
S
E
P
H
W
AY
7/17/23
C2023 MACNAIR LANDSCAPE ARCHITECTURE, NOT FOR GENERAL USE OR PUBLICATION, ALL RIGHTS RESERVED. THESE DRAWINGS AND SPECIFICATIONS ARE THE PROPERTY OF MACNAIR LANDSCAPE ARCHITECTURE. MACNAIR
LANDSCAPE ARCHITECTURE IS NOT RESPONSIBLE FOR THE ACCURACY OF ANY PLANS OR SURVEYS NOT DIRECTLY PREPARED BY THEM. SITE DIMENSIONS, GRADES, WATER
PRESSURES AND GENERAL CONDITIONS SHALL BE VERIFIED
PRIOR TO BEGINNING OF ANY WORK ON SITE. WRITTEN
DIMENSIONS SHALL TAKE PRECEDENCE OVER SCALED
DIMENSIONS.
L A N D S C A P E
A R C H I T E C T U R E
P O S T O F F IC E B O X 2 5 1
K E N W O O D , C A L I F O R NIA 9 5 4 5 2
TEL (707) 833-2288
RLA #2800
[email protected]
MACNAIR
A
P
N
#
0 4
3 -13
4 -
0 2
0 NO. 2800
EXP. 8/31/25
2 2-0
4 C
otati Base 07012
3.vwx
REV NO. DATE DESCRIPTION
X
X
X
X
X
X
X
X
X
W
6" W
2" PVT
DOM-22'
2" PVT
DOM-23'
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
6" S
S-3
9'
N66°16'19"E
SS
SS
ELEC
10+00
10+50
11+00
11+50
12+00
12+50 Δ= 14°59'22"
R= 250.00' L= 65.40'
C
SS
ST. JOSEPH WAY
M
A
T
C
H
LIN
E
S
T
A 12+4
8.9 M
A
T
C
H
LIN
E
S
T
A 12+4
8.9 VALVE #5
LANDSCAPE DRIPLINE - MODERATE
COTATI HOTEL
IRRIGATION PLANS
VALVE #5
LANDSCAPE DRIPLINE - MODERATE
COTATI HOTEL
IRRIGATION PLANS
VALVE #5
LANDSCAPE DRIPLINE - MODERATE
COTATI HOTEL
IRRIGATION PLANS
VALVE #5
LANDSCAPE DRIPLINE - MODERATE
COTATI HOTEL
IRRIGATION PLANS
VALVE #5
LANDSCAPE DRIPLINE - MODERATE
COTATI HOTEL
IRRIGATION PLANS
VALVE #31
ECO-MAT - LOW
COTATI HOTEL
IRRIGATION PLANS
VALVE #4
TREE BUBBLER - MODERATE
COTATI HOTEL
IRRIGATION PLANS
VALVE #4
TREE BUBBLER - MODERATE
COTATI HOTEL
IRRIGATION PLANS
VALVE #4
TREE BUBBLER - MODERATE
COTATI HOTEL
IRRIGATION PLANS
VALVE #4
TREE BUBBLER - MODERATE
COTATI HOTEL
IRRIGATION PLANS
VALVE #6
LANDSCAPE DRIPLINE - LOW
COTATI HOTEL
IRRIGATION PLANS
PROPERTY LINE
PROPERTY LINE
IRRIGATION CONTROLLER
COTATI HOTEL
IRRIGATION PLANS
IRRIGATION MAIN LINE
IRRIGATION
STATION 10+00 - 12+48.9
1 3
5 4
1 2
9 6
7 8
ST JOSEPH WAY
8" W-4
7'
6" PVT FIRE SERVICE P.O.C
6" S
S-3
9'
N51°16'57"E
SS
SD
12+50 13+00 13+50 14+00 14+50 15+00
EUG
EUG EUG
EUG
JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT
GAS GAS GAS GAS
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS
EUG EUG EUG EUG EUG EUG EUG EUG
VAULT EUG
M
M
FS
ST. JOSEPH WAY
M
A
T
C
H
LIN
E
S
T
A 12+4
8.9 M
A
T
C
H
LIN
E
S
T
A 12+4
8.9 M
A
T
C
H
LIN
E
S
T
A 15+13.9
M
A
T
C
H
LIN
E
S
T
A 15+13.9
VALVE #31
ECO-MAT - LOW
COTATI HOTEL
IRRIGATION PLANS
VALVE #31
ECO-MAT - LOW
COTATI HOTEL
IRRIGATION PLANS
VALVE #31
ECO-MAT - LOW
COTATI HOTEL
IRRIGATION PLANS
VALVE #31
ECO-MAT - LOW
COTATI HOTEL
IRRIGATION PLANS
VALVE #31
ECO-MAT - LOW
COTATI HOTEL
IRRIGATION PLANS
VALVE #31
ECO-MAT - LOW
COTATI HOTEL
IRRIGATION PLANS
VALVE #31
ECO-MAT - LOW
COTATI HOTEL
IRRIGATION PLANS
VALVE #30
TREE BUBBLER - MODERATE
COTATI HOTEL
IRRIGATION PLANS
VALVE #30
TREE BUBBLER - MODERATE
COTATI HOTEL
IRRIGATION PLANS
VALVE #30
TREE BUBBLER - MODERATE
COTATI HOTEL
IRRIGATION PLANS
VALVE #30
TREE BUBBLER - MODERATE
COTATI HOTEL
IRRIGATION PLANS
VALVE #30
TREE BUBBLER - MODERATE
COTATI HOTEL
IRRIGATION PLANS
VALVE #30
TREE BUBBLER - MODERATE
COTATI HOTEL
IRRIGATION PLANS
VALVE #30
TREE BUBBLER - MODERATE
COTATI HOTEL
IRRIGATION PLANS
VALVE #30
TREE BUBBLER - MODERATE
COTATI HOTEL
IRRIGATION PLANS
PROPERTY LINE
CITY SIDEWALK, REFER TO CIVIL
DRAWINGS
FACE OF CURB
VALVE #29
LANDSCAPE DRIPLINE - LOW
COTATI HOTEL
IRRIGATION PLANS
HOTEL MAIN ENTRANCE
IRRIGATION POINT OF
CONNECTION
COTATI HOTEL
IRRIGATION PLANS
VALVE #5
LANDSCAPE DRIPLINE - MODERATE
COTATI HOTEL
IRRIGATION PLANS
Dedicated 1" Irrigation Meter
MAXIMUM SAFE FLOW
STATIC WATER PRESSURE
OUTPUT PRESSURE
MAXIMUM OPERATING FLOW
METER SIZE
75.0 psi
35.3 gpm
67.0 psi
13.2 gpm
1.0 in
PROPERTY LINE
CONTAINERIZED PLANTING
OUTSIDE OF ROW
COTATI HOTEL
IRRIGATION PLANS
CONTAINERIZED PLANTING
OUTSIDE OF ROW
COTATI HOTEL
IRRIGATION PLANS
IRRIGATION
STATION 12+48.9 - 15+13.9
1 2 4
5 6
7 8
8 10
6" PVT FIRE-53'
W
W
W W W W W W
6" PVT FIRE SERVICE P.O.C
T
E
L
T
E
L
G
G
G
G
G
G
G
SD
SS
SD
15+50 16+00 16+50 17+00
7 JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT
EUG EUG EUG EUG EUG
EUG EUG EUG EUG EUG
PERGOLA
VAULT
ST. JOSEPH WAY
29 1"
4.1 gpm
Dripline
30 1"
5.5 gpm
Bubbler
31 1"
8.3 gpm
Dripline
32 1"
2.0 gpm
Dripline
VALVE #30
TREE BUBBLER - MODERATE
COTATI HOTEL
IRRIGATION PLANS
VALVE #30
TREE BUBBLER - MODERATE
COTATI HOTEL
IRRIGATION PLANS
VALVE #30
TREE BUBBLER - MODERATE
COTATI HOTEL
IRRIGATION PLANS
VALVE #31
ECO-MAT - LOW
COTATI HOTEL
IRRIGATION PLANS
VALVE #31
ECO-MAT - LOW
COTATI HOTEL
IRRIGATION PLANS
VALVE #29
LANDSCAPE DRIPLINE - LOW
COTATI HOTEL
IRRIGATION PLANS
VALVE #29
LANDSCAPE DRIPLINE - LOW
COTATI HOTEL
IRRIGATION PLANS
PROPERTY LINE
CITY SIDEWALK, REFER TO CIVIL
DRAWINGS
COURTYARD ENTRANCE
PROPERTY LINE
FACE OF CURB
IRRIGATION PLAN
Scale: 1"= 10'-0"
IRRIGATION
STATION 15+13.9 -16+60.25
M
A
T
C
H
LIN
E
S
T
A 15+13.9
11 12
1 2
4 5
G
IMPROVEMENT PLANS IRRIGATION KEYNOTES
1. 2. 3.
4. 5.
6. 7.
8. 9.
10. 11.
12. INSTALL DRIPLINE 3" BELOW GRADE IN ALL PLANTING AREAS AT 18" OC TYPICAL; ALL DRIPLINE SHALL BE INSTALLED PARALLEL GENERALLY FOLLOWING CONTOURS. HOLD DRIPLINE BACK FROM
EDGE 6". DRIPLINE WITH GOLD BORDER DESIGNATES LOW WATER USE CIRCUIT. DRIPLINE WITH BLUE BORDER DESIGNATES MODERATE WATER USE CIRCUIT. ECO-MAT: INSTALL 4" BELOW GRADE IN BIORETENTION AREAS AT 14" OC; LOW WATER USE, TYPICAL TREE BUBBLERS, TWO PER TREE , TYPICAL. ONE ABOVE GRADE
STREAM BUBBLER AND ONE SUB-SUFACE BUBBLER
IRRIGATION LATERAL
TYPICAL IRRIGATION SLEEVE BENEATH PAVEMENT; SIZE SLEEVE TO CONTAIN PIPE AND WIRE PER DETAIL; MINIMUM SIZE NO LESS THAN 3" DIAMETER IRRIGATION LAYOUT IS DIAGRAMMATIC. INSTALL ALL MAIN LINE, LATERALS AND CONTROL WIRE IN LANDSCAPE AREAS. DO NOT INSTALL IN PUBLIC RIGHT OF WAY. WHEN LAYOUT REQUIRES
INSTALLATION UNDER PAVING, USE IRRIGATION SLEEVES PER DETAIL SHEET L-3. CONTROLLER LOCATION: PEDESTAL MOUNT; SUBJECT TO OWNER
APPROVAL
IRRIGATION POINT OF CONNECTION AT RECLAIMED WATER SERVICE
WATER LINE, REFER TO CIVIL DRAWINGS
DRIPLINE VALVE, TYP. TREE BUBBLER VALVE, TYP.
THESE DRAWINGS COMPLY WITH THE CRITERIA OF THE ORDINANCE. ORDINANCE REQUIREMENTS HAVE BEEN APPLIED FOR THE EFFICIENT
USE OF WATER IN THE IRRIGATION DESIGN PLAN AND THE LANDSCAPE DESIGN PLAN.”
U.S.A NOTE
IT IS THE RESPONSIBILITY OF THE LANDSCAPE CONTRACTOR TO BE FAMILIAR WITH ALL GRADE DIFFERENCES, LOCATION OF WALLS, STRUCTURES, AND UTILITIES. THE IRRIGATION
CONTRACTOR SHALL EXERCISE EXTREME CARE, AND BE RESPONSIBLE FOR ANY DAMAGE IN EXCAVATING AND WORKING NEAR UTILITIES. THE LANDSCAPE CONTRACTOR SHALL
COORDINATE ALL WORK WITH THE OTHER SUB-CONTRACTORS FOR THE LOCATION OF
UTILITIES AND THE INSTALLATION OF PIPE SLEEVES THROUGH WALLS, UNDER ROADWAYS, AND NEAR STRUCTURES. PRIOR TO CONSTRUCTION, CONTACT ALL APPLICABLE AGENCIES AND U.S.A. AT 1-800-642-2444 OR 1-800-227-2600 TO FIELD LOCATE ALL EXISTING UTILITIES.
BIORETENTION AREAS
SUPPLEMENTAL TEMPORARY IRRIGATION
CONTRACTOR SHALL BE RESPONSIBLE FOR TEMPORARY SUPPLEMENTAL IRRIGATION OF ALL BIO-RETENTION AREAS THROUGH THE SOD OR PLANT ESTABLISHMENT PERIOD. METHOD OF
IRRIGATION APPLICATION IS DISCRETIONARY AND MAY INCLUDE HAND WATERING OR INSTALLATION OF A TEMPORARY, ABOVE GRADE OVERHEAD SPRAY CIRCUIT. ANY REPLACEMENT NECESSARY FOR LOSS
OR DAMAGE TO SOD OR PLANTS DUE TO LACK OF WATER SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR AT CONTRACTOR'S EXPENSE.
IRRIGATION POC
SCHEMATIC
IRRIGATION MAIN
TO VALVES
REDUCED PRESSURE
BACKFLOW PREVENTER
IRRIGATION METER
PRESSURE REGULATOR
(OPTIONAL)
M
FS FLOW SENSOR
MV
IRRIGATION
MASTER VALVE
ALL IRRIGATION PIPING AND
WATER DELIVERY EQUIPMENT
TO BE PURPLE AND SHALL
INDICATE RECLAIMED WATER
FOR FUTURE USE.
THIS SUBMITTAL HAS BEEN ADAPTED AND MODIFIED FROM THE
APPROVED DESIGN REVIEW LANDSCAPE SUBMITTAL DATED
8/19/19 PREPARED BY QUADRIGA LANDSCAPE ARCHITECTURE &
PLANNING, INC. ELEMENTS OF THIS DESIGN HAS BEEN UTILIZED TO MEET THE DESIGN INTENT OF THE APPROVED DRAWINGS.
REFER TO SHEET L17 FOR IRRIGATION LEGEND AND
IRRIGATION NOTES. REFER TO SHEET L18 FOR IRRIGATION WELO CALCULATIONS AND DETAILS.
X
X
X
X
X
X
X
X
X
X
X
X
W
6" W
2" PVT
DOM-22'
2" PVT
DOM-23'
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
6" S
S-3
9'
N66°16'19"E
SS
SS
ELEC
10+00
10+50
11+00
11+50
12+00
12+50 Δ= 14°59'22"
R= 250.00' L= 65.40'
1 RCL
3 SCW
5 FMA
1 CCO
2 EGI
1 HSS
4 PAC
24 AMS
22 CTE
38 JPE
6 AMB
ST. JOSEPH WAY
PLANTING
STATION 10+00 - 12+48.9
M
A
T
C
H
LIN
E
S
T
A 12+4
8.9 M
A
T
C
H
LIN
E
S
T
A 12+4
8.9 M
A
T
C
H
LIN
E
S
T
A 12+4
8.9 M
A
T
C
H
LIN
E
S
T
A 12+4
8.9 ST JOSEPH WAY
8" W-4
7'
6" PVT FIRE SERVICE P.O.C
6" S
S-3
9'
N51°16'57"E
SS
SD
12+50 13+00 13+50 14+00 14+50 15+00
EUG
EUG EUG
EUG
JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT
GAS GAS GAS GAS
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS
EUG EUG EUG EUG EUG EUG EUG EUG
VAULT EUG
2 CTE
9 JPE
6 AMS
8 ARA
3 AMB
12 JPE
ST. JOSEPH WAY
PLANTING PLAN
STATION 12+48.9 - 15+13.9
M
A
T
C
H
LIN
E
S
T
A 12+4
8.9 M
A
T
C
H
LIN
E
S
T
A 12+4
8.9 M
A
T
C
H
LIN
E
S
T
A 15+13.9
M
A
T
C
H
LIN
E
S
T
A 15+13.9
6" PVT FIRE-53'
W
W
W W W W W W
6" PVT FIRE SERVICE P.O.C
T
E
L
T
E
L
G
G
G
G
G
G
G
SD
SS
SD
15+50 16+00 16+50 17+00
7 JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT
EUG EUG EUG EUG EUG
EUG EUG EUG EUG EUG
PERGOLA
VAULT
2 CTE
3 ST ARA . JOSEPH WAY
PLANTING PLAN
STATION 15+13.9 -16+60.25 PLANTING PLAN
Scale: 1"= 10'-0"
M
A
T
C
H
LIN
E
S
T
A 15+13.9
M
A
T
C
H
LIN
E
S
T
A 15+13.9
C
O
TA
TI H
O
T
E
L
IM
P
R
O
V
E
M
E
N
T
P
L
A
N
S
1 4
7 S
T. J
O
S
E
P
H
W
AY
C
O
TA
TI, C
A
DATE: MLA JOB #: SCALE: DRAWN:
2022-04
1" = 20' DM
L15
SHEET L15 OF 19
P
L
A
N
TIN
G
P
L
A
N
S
T. J
O
S
E
P
H
W
AY
7/17/23
C2023 MACNAIR LANDSCAPE ARCHITECTURE, NOT FOR GENERAL USE OR PUBLICATION, ALL RIGHTS RESERVED. THESE DRAWINGS AND SPECIFICATIONS ARE THE PROPERTY OF MACNAIR LANDSCAPE ARCHITECTURE. MACNAIR
LANDSCAPE ARCHITECTURE IS NOT RESPONSIBLE FOR THE ACCURACY OF ANY PLANS OR SURVEYS NOT DIRECTLY PREPARED BY THEM. SITE DIMENSIONS, GRADES, WATER
PRESSURES AND GENERAL CONDITIONS SHALL BE VERIFIED
PRIOR TO BEGINNING OF ANY WORK ON SITE. WRITTEN
DIMENSIONS SHALL TAKE PRECEDENCE OVER SCALED
DIMENSIONS.
L A N D S C A P E
A R C H I T E C T U R E
P O S T O F F IC E B O X 2 5 1
K E N W O O D , C A L I F O R NIA 9 5 4 5 2
TEL (707) 833-2288
RLA #2800
[email protected]
MACNAIR
A
P
N
#
0 4
3 -13
4 -
0 2
0 NO. 2800
EXP. 8/31/25
2 2-0
4 C
otati Base 07012
3.vwx
REV NO. DATE DESCRIPTION
REFER TO SHEET L17 FOR PLANT LEGEND AND PLANTING NOTES. REFER TO SHEET L18 FOR LANDSCAPE DETAILS.
C
O
TA
TI H
O
T
E
L
IM
P
R
O
V
E
M
E
N
T
P
L
A
N
S
1 4
7 S
T. J
O
S
E
P
H
W
AY
C
O
TA
TI, C
A
DATE: MLA JOB #: SCALE: DRAWN:
2022-04
1" = 20' DM
L17
SHEET L17 OF 19
IR
RIG
A
TIO
N
A
N
D
P
L
A
N
TIN
G
L
E
G
E
N
D
S
7/17/23
C2023 MACNAIR LANDSCAPE ARCHITECTURE, NOT FOR GENERAL USE OR PUBLICATION, ALL RIGHTS RESERVED. THESE DRAWINGS AND SPECIFICATIONS ARE THE PROPERTY OF MACNAIR LANDSCAPE ARCHITECTURE. MACNAIR
LANDSCAPE ARCHITECTURE IS NOT RESPONSIBLE FOR THE ACCURACY OF ANY PLANS OR SURVEYS NOT DIRECTLY PREPARED BY THEM. SITE DIMENSIONS, GRADES, WATER
PRESSURES AND GENERAL CONDITIONS SHALL BE VERIFIED
PRIOR TO BEGINNING OF ANY WORK ON SITE. WRITTEN
DIMENSIONS SHALL TAKE PRECEDENCE OVER SCALED
DIMENSIONS.
L A N D S C A P E
A R C H I T E C T U R E
P O S T O F F IC E B O X 2 5 1
K E N W O O D , C A L I F O R NIA 9 5 4 5 2
TEL (707) 833-2288
RLA #2800
[email protected]
MACNAIR
A
P
N
#
0 4
3 -13
4 -
0 2
0 NO. 2800
EXP. 8/31/25
2 2-0
4 C
otati Base 07012
3.vwx
REV NO. DATE DESCRIPTION
PLANT LEGEND
SYMBOL SIZE BOTANICAL NAME COMMON NAME WATER USE PER WUCOLS IV QUANTITY COMMENTS Trees
ARA #24 Acer rubrum 'Armstrong' Armstrong Maple .6 8 City Street Tree CCO #24 Cercis canadensis reniformis 'Oklahoma' Oklahoma Redbud .3 1 PAC #24 Platanus acerifolia 'Columbia' London Planetree .6 4 City Street Tree Shrubs
RCL #5 Rhamnus californica 'Leatherleaf' Leatherleaf Coffee Berry .3 1 Perennials
AMB #1 Achillea millefolium 'Salmon Beauty' Salmon BeautyYarrow .3 15 AMS #1 Achillea millefolium 'Sonoma Coast' White Yarrow .3 30 ALK #1 Achillea x lewisii 'King Edward' King Edward Wooly Yarrow .3 119 EGI #5 Eriogonum giganteum St. Catherine's Lace .1 2
SCW #5 Salvia clevelandii 'Winifred Gillman' Winifred Gillman Sage .3 3 Groundcover
#1 Rubus calycinoides 'Emerald Carpet' Crinkled Creeper --- 17 3' OC, Triangular Spacing Ornamental Grass
CTE #1 Chondropetalum tectorum Cape Rush .3 27
FMA #1 Festuca mairei Atlas Fescue .3 42
HSS #1 Helictotrichon sempervirens 'Saphirsprudel' Sapphire Fountain Blue Oat Grass .3 1 JPE #1 Juncus patens 'Elk Blue' Elk Blue California Gray Rush .3 89 Bioretention Areas
#1 Carex divulsa Berkeley Sedge 0.3 98 40% of Total Quantity; 24" OC #1 Juncus patens Blue Rush 0.3 23 20% of Total Quantity; 36" OC #1 Iris douglasiana Douglas Iris 0.3 8 15% of Total Quantity; 60" OC #1 Sisyrinchium bellum Blue-eyed Grass 0.3 108 25% of Total Quantity; 18" OC Other
Mulch: Fir Bark 1-1/2" Minus Medium Walk-On Bark 3" Depth, All Landscape Areas See Detail Linear Root Barrier Root Solutions, or Equal 24" Depth, Continuous
IRRIGATION NOTES
1. ALL SPRINKLER HEADS SHALL BE SET PERPENDICULAR TO FINISH GRADE OF THE AREA TO BE IRRIGATED UNLESS OTHERWISE NOTED ON THE PLANS. 2. THE SPRINKLER SYSTEM DESIGN IS BASED ON THE MINIMUM STATIC PRESSURE OF 35 PSI AT THE VALVES AND THE MAXIMUM FLOW DEMAND SHOWN ON THE IRRIGATION DRAWINGS AT THE POINT OF CONNECTION. THE IRRIGATION CONTRACTOR SHALL VERIFY WATER PRESSURE PRIOR TO CONSTRUCTION OF THE IRRIGATION SYSTEM. IF THE WATER
PRESSURE SHOWN ON THE DRAWINGS DIFFERS FROM THE ACTUAL PRESSURE READING AT THE IRRIGATION POINT OF CONNECTION, THE CONTRACTOR SHALL NOTIFY THE LANDSCAPE ARCHITECT IMMEDIATELY. IN THE EVENT PRESSURE
DIFFERENCES ARE NOT REPORTED PRIOR TO THE START OF CONSTRUCTION, THE IRRIGATION CONTRACTOR SHALL ASSUME FULL RESPONSIBILITY FOR ANY REVISIONS NECESSARY. 3. THE LOCATION OF THE CONTROLLER TO BE VERIFIED BY OWNER. LANDSCAPE CONTRACTOR SHALL BE RESPONSIBLE FOR CONNECTING ALL PROPOSED STATIONS TO THE CONTROLLER. CONTROLLER TO BE CONFIGURED TO OPERATE 33 STATIONS. CONTROLLER SHALL BE HUNTER IC-600-M WITH FIVE ICM-600 EXPANSION MODULES. 4. ALL CONSTRUCTION IS TO BE PER THE LATEST EDITION OF THE UNIFORM BUILDING CODE. 5. THIS DESIGN IS DIAGRAMMATIC. ALL PIPING, VALVES, ROOT BARRIERS, ETC. SHOWN WITHIN PAVED AREAS ARE FOR DESIGN CLARIFICATION ONLY. INSTALL PIPING AND VALVES IN PLANTING AREAS WHERE POSSIBLE, AND LOCATE ELECTRIC CONTROL AND QUICK COUPLING VALVES IN GROUND COVER/SHRUB AREAS, 6" TO 12" AWAY FROM HARDSCAPE OR TURF AREA FOR EASY ACCESS. 6. THE IRRIGATION CONTRACTOR SHALL FLUSH AND ADJUST ALL SPRINKLER HEADS FOR OPTIMUM PERFORMANCE AND TO PREVENT OVER SPRAY ONTO WALKS, ROADWAYS, AND/OR BUILDINGS. THIS SHALL INCLUDE SELECTING THE
BEST DEGREE OF ARC TO FIT THE EXISTING SITE CONDITIONS AND THROTTLING THE FLOW CONTROL AT EACH VALVE TO OBTAIN THE OPTIMUM OPERATING PRESSURE FOR EACH SYSTEM. 7. IT IS THE RESPONSIBILITY OF THE IRRIGATION CONTRACTOR TO FAMILIARIZE THEMSELF WITH ALL GRADE DIFFERENCES, LOCATION OF WALLS, STRUCTURES, AND UTILITIES. THE IRRIGATION CONTRACTOR SHALL EXERCISE EXTREME CARE, AND BE RESPONSIBLE FOR ANY DAMAGE IN EXCAVATING AND WORKING NEAR UTILITIES. CONTRACTOR SHALL COORDINATE ALL WORK WITH THE GENERAL CONTRACTOR AND OTHER SUB-CONTRACTORS
FOR THE LOCATION OF UTILITIES AND THE INSTALLATION OF PIPE SLEEVES THROUGH WALLS, UNDER ROADWAYS, AND NEAR STRUCTURES. PRIOR TO CONSTRUCTION, CONTACT ALL APPLICABLE AGENCIES AND U.S.A. AT 1-800-642-2444 TO FIELD LOCATE ALL EXISTING UTILITIES. 8. FIELD ADJUSTMENTS MAY BE REQUIRED TO PROVIDE OPTIMUM OPERATING EFFICIENCY. THE CONTRACTOR
SHALL BE RESPONSIBLE FOR CONTACTING THE LANDSCAPE ARCHITECT TO REVIEW FIELD ADJUSTMENTS PRIOR TO INSTALLATION. IN THE EVENT THAT NO CONTACT IS MADE WITH THE LANDSCAPE ARCHITECT, THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY REVISIONS. 9. SLEEVE ALL IRRIGATION PIPE AND CONTROL WIRES UNDER STREETS AND CONCRETE WALKWAYS WITH THE PROPER SIZE CLASS 200 PVC PIPE TO DEPTH AS SPECIFIED.
10. FOR ADDITIONAL INFORMATION, SEE PROJECT DETAILS AND SPECIFICATIONS.
11. ALL WORK SHALL CONFORM TO ALL APPLICABLE CITY OF COTATI CONSTRUCTION STANDARDS.
12. NO GALVANIZED IRON PIPE OR FITTINGS SHALL BE ALLOWED.
13. A BALL VALVE IN A SEPARATE ROUND VALVE BOX IS TO BE INSTALLED IMMEDIATELY UPSTREAM FROM EACH REMOTE CONTROL VALVE OR GHROUP OF VALVES. VALVE SHALL BE SIZED TO MAINLINE SUPPLY AT THE RC VALVE. SEE DETAIL.
14. INSTALL 3" WIDE DETECTABLE TAPE (#3" DTP, AS MANUFACTURED BY T. CHRISTY). TAPE SHALL BE INSTALLED 6" ABOVE THE IRRIGATION MAIN.
15. INSTALL ALL LANDSCAPE DRIPLINE BENEATH MULCH. INSTALL ALL TUBING 3" BELOW GRADE, PARALLEL AT SPACING INDICATED. USE LANDSCAPE STAPLES IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS TO SECURE TUBING TO GROUND.
16. A SIGNED CERTIFICATE OF COMPLETION IS REQUIRED PRIOR TO FINAL ACCEPTANCE BY THE CITY OF COTATI. IF
THE INSTALLATION OF THE LANDSCAPE DOES MEET OR SUBSTANTIALLY COMPLY WITH THE APPROVED LANDSCAPE
CONSTRUCTION DOCUMENTS, THE CERTIFICATE OF COMPLETION WILL NOT BE SIGNED OR APPROVED BY THE LANDSCAPE ARCHITECT OF RECORD.
IRRIGATION NOTES***
1. THE LANDSCAPE CONTRACTOR SHALL INSPECT THE SITE AND VERIFY CONDITIONS AND DIMENSIONS PRIOR TO CONSTRUCTION. 2. INSTALL IRRIGATION SYSTEM IN ACCORDANCE WITH ALL LOCAL CODES AND ORDINANCES. 3. SEE DETAILS AND SPECIFICATIONS FOR PROCEDURES, MATERIAL AND INSTALLATION REQUIREMENTS. 4. PRIOR TO CUTTING INTO SOIL, LOCATE ALL CABLES, CONDUITS, SEWERS, AND OTHER UTILITIES OR
ARCHITECTURAL FEATURES THAT ARE COMMONLY ENCOUNTERED UNDERGROUND AND TAKE PROPER PRECAUTIONS NOT TO DAMAGE OR DISTURB SUCH IMPROVEMENTS. ANY DAMAGE MADE DURING
THE INSTALLATION OF THE IRRIGATION SYSTEM OF THE AFOREMENTIONED ITEMS SHALL BE REPAIRED AND/OR REPLACED TO THE SATISFACTION OF THE OWNER AT THE CONTRACTOR'S OWN EXPENSE. 4. CONTRACTOR TO MINIMIZE DISTURBANCE TO EXISTING TREE ROOTS ON SITE. CUT MINOR ROOTS (LESS THAN 2"
IN DIAMETER) OF TREES INDICATED TO REMAIN IN A CLEAN AND CAREFUL MANNER WHERE SUCH ROOTS OBSTRUCT INSTALLATION OF NEW CONSTRUCTION. IF ANY ROOTS GREATER THAN 2" ARE ENCOUNTERED STOP WORK AND CONTACT THE OWNER'S REPRESENTATIVE IMMEDIATELY. 5. THE IRRIGATION DESIGN IS DIAGRAMMATIC. ALL PIPING, VALVES, ETC., SHOWN WITHIN PAVED AREAS ARE FOR DESIGN CLARIFICATION ONLY AND SHALL BE NSTALLED IN PLANTING AREAS. MAIN AND VALVES SHALL BE INSTALLED IN SHRUB/GROUND COVER AREAS ONLY. AVOID CONFLICTS WITH UTILITIES, NEW PLANTING, NEW SITE OR ARCHITECTURAL ELEMENTS. 7. ALL VALVES SHALL BE PLACED IN NDS PRO SERIES, OR EQUAL, PURPLE VALVE BOX. ALL VALVE BOXES SHALL BE LOCATED IN GROUNDCOVER AREAS WHENEVER POSSIBLE, AND SHALL BE BOLTED. 8. STATION OPERATION TIMES SHALL NOT EXCEED THE SOIL'S INFILTRATION RATE AS DETERMINED BY THE SOILS REPORT. 9. ALL LATERAL END RUNS SHALL BE 3/4" SIZE UNLESS OTHERWISE NOTED.
10. WHERE PIPE SIZES HAVE BEEN OMITTED OR THERE IS A CONFLICT, REFER TO THE LATERAL PIPE SIZING CHART FOR SIZES.
11. INSTALL ONE SPARE COMMON AND TWO SPARE CONTROL WIRES FROM EACH CONTROLLER IN A CONTINUOUS LOOP THROUGH EACH VALVE BOX CONNECTED TO THAT CONTROLLER FOR FUTURE USE.
12. CONTRACTOR SHALL COORDINATE SLEEVING FOR IRRIGATION PIPING WITH PAVING CONTRACTOR PRIOR TO PAVING INSTALLATION. IT IS THE CONTRACTOR'S RESPONSIBILITY FOR PROVIDING APPROPRIATE SLEEVING UNDER HARDSCAPE. AT EACH MAINLINE SLEEVE, PROVIDE A SEPARATE, APPROPRIATE-SIZE SLEEVE FOR CONTROL/COMMON WIRING.
13. THE LANDSCAPE CONTRACTOR SHALL COORDINATE HIS WORK WITH OTHER TRADES INVOLVED (I.E. GRADING, PLUMBING AND ELECTRICAL CONTRACTORS).
14. CONTRACTOR SHALL VERIFY ALL LOCATIONS AND FUNCTION OF EXISTING IRRIGATION EQUIPMENT AND POINTS
OF CONNECTION THAT ARE TO REMAIN OR TO CONNECT TO NEW IRRIGATION SYSTEMS, UPON NOTIFICATION OF AWARD OF CONTRACT. CONTRACTOR TO IMMEDIATELY NOTIFY LANDSCAPE ARCHITECT IF ANY DISCREPANCIES ARE FOUND BETWEEN PLANS AND EXISTING IRRIGATION CONDITIONS.
15. THE IRRIGATION SYSTEMS ARE DESIGNED TO OPERATE AT 62 PSI AT POINT OF CONNECTION TO IRRIGATION WATER SUPPLY. LANDSCAPE CONTRACTOR SHALL TEST PRESSURE AT POINT OF CONNECTION PRIOR TO INSTALLATION OF THE IRRIGATION BACKFLOW PREVENTION DEVICE, OR ANY OTHER IRRIGATION EQUIPMENT. NOTIFY LANDSCAPE ARCHITECT IMMEDIATELY IF PRESSURE IS BELOW 62 PSI OR OVER 62 PSI TO DETERMINE NEEDED PRESSURE REGULATION DEVICES. (I.E. BOOST PUMP OR REGULATING VALVE.) ***DESIGN DEVELOPMENT IRRIGATION NOTES FROM SUBMITTAL DATED 8/19/19 PREARED BY QUADRIGA LANDSCAPE ARCHITECTURE AND PLANNING, INC.
IRRIGATION LEGEND
SYMBOL EQUIPMENT MANUFACTURER MODEL REMARKS
Stream Bubbler: 6" Pop-Up Hunter PROS-06-CV-R-PRS30-MSBN-25Q PROS-06-PRS30-CV Root Zone Watering System Hunter PCN-25 PROS-00
Landscape Dripline - Low Water Use Area Rain Bird XFS-06-12 Install in parallel rows at spacing indicated. Landscape Dripline - Moderate Water Use Area Rain Bird XFS-06-12 Install in parallel rows at spacing indicated.
Eco-Mat Hunter Eco-Mat-17
Poly to PVC Header See Detail G/L3
SEE DETAIL Automatic Line Flush Valve Hunter AFV-T Install in 6" Valve Box @ end of circuit SEE DETAIL Air Relief Valve Hunter AVR-075 Install in 6" Valve Box @ high point(s) of circuit SEE DETAIL Continuous Acting Air Vent Netafim 65ARIS1 Install upstream from sub-meter Drip Zone Control Valve Hunter Industries(R) ICZ-101-25 Zone Control Valve Hunter Industries(R) ICV-101G-AS-ADJ Master Valve Hunter Industries(R) ICV-101G
Watts 1" Ball Valve Watts B6400
1" Watts Reduced Pressure Backflow Preventer Watts LF009M2-PC-QT 1 Flow Sensor CST ELF-T75-PO1
Rainbird 1" Quick Coupling Valve Rainbird 44-NP Use with Reclaimed Water Backflow Preventer Enclosure Le Muer BF 18" X 30" X 30" Install Per Manufacturer's Specs Irrigation Controller - 6 Station Hunter Industries(R) IC-600-SS with Stainless Pedetal 6 Station Plug-In Expansion Module Hunter ICM-600 (4 TOTAL) Solar Sync Weather Sensor Hunter WSS-SEN Mount on light pole with clear view of sky Main Line PVC Sch 40 0 0
Lateral PVC Sch 40 0 0
Pipe and Wire Sleeve PVC Schedule 40 Size by pipe load; 2" PVC minimum Valve Station and Sequence Valve Size Gallons Per Minute
ALL IRRIGATION PIPING AND WATER DELIVERY
EQUIPMENT TO BE PURPLE AND SHALL INDICATE
RECLAIMED WATER FOR FUTURE USE.
PLANTING NOTES
1. A MINIMUM OF 8" OF NON-MECHANICALLY COMPACTED SOIL SHALL BE AVAILABLE FOR WATER ABSORPTION AND ROOT GROWTH IN PLANTED AREAS. 2. INCORPORATE COMPOST OR NATURAL FERTILIZER INTO THE SOIL TO A MINIMUM DEPTH OF 8" AT A MINIMUM RATE OF 8 CUBIC YARDS PER 1,000 SQUARE FEET OR PER SPECIFIC AMENDMENT RECOMMENDATIONS FROM A SOILS LABORATORY REPORT. 3. FINISH GRADE SHALL BE 3" BELOW THE TOP OF ADJACENT CURBS, WALKS OR PAVED AREAS. FINISH GRADE SHALL BE SMOOTH AND EVEN. 4. A MINIIMUM 3" LAYER OF MULCH SHALL BE APPLIED ON ALL EXPOSED SOIL SURFACES OF PLANTING AREAS EXCEPT IN BIORETENTION AREAS, TURF AREAS, CREEPING OR ROOTING GROUNDCOVERS OR DIRECT SEEDING APPLICATIONS. 5. ALL GROUND COVER TO BE SPACED IN A TRIANGULAR PATTERN. CONTRACTOR RESPONSIBLE FOR COMPLETE COVERAGE. 6. UNLESS OTHERWISE SPECIFIED, WEED BARRIER FABRIC IS NOT PERMITTED.
7. SUPPLY AGRIFORM 21 GRAM TABLETS AS FOLLOWS: 5-15 GAL., 3-5 GAL., 1-1 GAL. 8. x
9. BACKFILL PITS WITH 2/3 EXISTING SOIL, 1/3 ORGANIC AMENDMENT
10. ALL PLANTS TO BE SPOTTED IN THE FIELD BY LANDSCAPE ARCHITECT PRIOR TO PLANTING.
11. WHEN LANDSCAPING IN EXISTING PLANTED AREAS, CONTRACTOR SHALL TAKE CARE NOT TO DAMAGE OR DESTROY ANY EXISTING PLANT MATERIAL OR IRRIGATION. EXISTING PLANT MATERIAL AND IRRIGATION THAT IS DAMAGED SHALL BE REPLACED WITH LIKE, SIZE, QUALITY, ETC. BY THE CONTRACTOR AT THEIR EXPENSE.
12. SPECIAL ATTENTION IS TO BE PAID TO THE PLANTING AREAS SURROUNDING THE BUILDINGS. COMPACTED SOIL IS TO BE SUFFICIENTLY EXCAVATED TO ALLOW FOR PROPER ROOT GROWTH AND DRAINAGE OF ALL AREAS. CHECK SOIL FOR PROPER DRAINAGE PRIOR TO PLANTING. AUGER THROUGH COMPACTED SOIL WHERE NECESSARY. DO NOT PLANT IN THE DRAINAGE SWALES.
13. LIME SOILS SHALL BE REMOVED FROM LANDSCAPE AREAS PER SPECIFICATION. CONTRACTOR SHALL PROVIDE A DIAGRAM INDICATING DEPTHS AND LIMITS OF LIMED SOIL AREAS.
14. A SOILS REPORT SHALL BE PROVIDED FOR ALL IMPORTED TOP SOILS. REFER TO SPECIFICATIONS.
15. SOIL SAMPLE REPORTS AND IRRIGATION WATER SUITABILITY REPORT SHALL BE REVIEWED BY LANDSCAPE ARCHITECT PRIOR TO AMENDING SOILS, PER SPECIFICATIONS.
16. ALL CONSTRUCTION IS TO BE PER ALL APPLICABLE AND PREVAILING CITY OF COTATI CONSTRUCTION STANDARDS.
17. A SIGNED CERTIFICATE OF COMPLETION IS REQUIRED PRIOR TO FINAL ACCEPTANCE BY THE CITY OF COTATI. IF THE
INSTALLATION OF THE LANDSCAPE DOES MEET OR SUBSTANTIALLY COMPLY WITH THE APPROVED LANDSCAPE CONSTRUCTION
DOCUMENTS, THE CERTIFICATE OF COMPLETION WILL NOT BE SIGNED OR APPROVED BY THE LANDSCAPE ARCHITECT OF RECORD. SOIL ANALYSIS REPORT
PRIOR TO AMENDING ON-SITE SOILS, A SOIL ANALYSIS REPORT SHALL BE COMPLETED BY THE PROJECT APPLICANT, OR THEIR DESIGNEE, AS FOLLOWS:
(1) SUBMIT SOIL SAMPLES TO A LABORATORY FOR ANALYSIS AND RECOMMENDATIONS. (A) SOIL SAMPLING SHALL BE CONDUCTED IN ACCORDANCE
WITH LABORATORY PROTOCOL, INCLUDING PROTOCOLS
REGARDING ADEQUATE SAMPLING DEPTH FOR THE
INTENDED PLANTS. 2) THE SOIL ANALYSIS SHALL INCLUDE:
(A) SOIL TEXTURE;
(B) INFILTRATION RATE DETERMINED BY LABORATORY TEST OR
SOIL TEXTURE INFILTRATION RATE TABLE;
(C) PH;
(D) TOTAL SOLUBLE SALTS;
(E) SODIUM;
(F) PERCENT ORGANIC MATTER; AND
G) RECOMMENDATIONS.
(3) THE SOIL ANALYSIS REPORT SHALL BE MADE AVAILABLE, IN A
TIMELY MANNER, TO THE PROFESSIONALS PREPARING THE
LANDSCAPE DESIGN PLANS AND IRRIGATION DESIGN PLANS TO
MAKE ANY NECESSARY ADJUSTMENTS TO THE DESIGN PLANS.
(4) IF A GRADING PERMIT IS REQUIRED, THE SOIL ANALYSIS REPORT
SHALL BE SUBMITTED TO THE CITY WITH THE CERTIFICATE OF
COMPLETION. IF A GRADING PERMIT IS NOT REQUIRED, THE SOIL
ANALYSIS REPORT SHALL BE SUBMITTED TO THE CITY WITH THE LANDSCAPE DOCUMENTATION PACKAGE.
(6) THE PROJECT APPLICANT, OR HIS/HER DESIGNEE, SHALL SUBMIT
DOCUMENTATION VERIFYING IMPLEMENTATION OF SOIL ANALYSIS
REPORT RECOMMENDATIONS TO THE CITY WITH CERTIFICATE OF
COMPLETION."
WELO REQUIREMENT OF DOCUMENT OF COMPLIANCE
(ITEMS TO BE INCLUDED WITH CERTIFICATE OF COMPLETION)
A. PROJECT APPLICANT MUST SUBMIT DOCUMENTATION VERIFYING IMPLEMENTATION OF SOIL
ANALYSIS REPORT RECOMMENDATIONS TO THE CITY WITH CERTIFICATE OF COMPLETION B. THE CERTIFICATE OF COMPLETION MUST BE ACCOMPANIED BY AN IRRIGATION AUDIT THAT CONTAINS THE FOLLOWING:
◆ OPERATING PRESSURE OF THE IRRIGATION SYSTEM
◆ DISTRIBUTION UNIFORMITY OF OVERHEAD IRRIGATION
◆ PRECIPITATION RATE OF OVERHEAD IRRIGATION
◆ REPORT OF ANY OVERSPRAY OR BROKEN IRRIGATION EQUIPMENT ◆ IRRIGATION SCHEDULE INCLUDING:
1. PLANT ESTABLISHMENT IRRIGATION SCHEDULE
2. REGULAR IRRIGATION SCHEDULE BY MONTH (SEE ORDINANCE FOR DETAILS)
3. VERIFICATION THAT A DIAGRAM OF THE IRRIGATION PLAN SHOWING
HYDROZONES IS KEPT WITH THE IRRIGATION CONTROLLER FOR SUBSEQUENT MANAGEMENT PURPOSES .
◆ ALL LANDSCAPE IRRIGATION AUDITS MUST BE CONDUCTED BY A CITY CERTIFIED
LANDSCAPE IRRIGATION AUDITOR OR A THIRD PARTY CERTIFIED LANDSCAPE IRRIGATION AUDITOR.
◆ AN IRRIGATION MAINTENANCE SCHEDULE TIMELINE MUST BE ATTACHED TO THE
CERTIFICATE OF COMPLETION (SEE ORDINANCE FOR DETAILS)
C. IRRIGATION AUDIT: AN IN-DEPTH EVALUATION OF THE PERFORMANCE OF AN IRRIGATION
SYSTEM CONDUCTED BY A CERTIFIED LANDSCAPE IRRIGATION AUDITOR (SEE ORDINANCE FOR DETAILS). THE AUDIT MUST BE CONDUCTED IN A MANNER CONSISTENT WITH THE IRRIGATION ASSOCIATION’S LANDSCAPE IRRIGATION AUDITOR CERTIFICATION PROGRAM OR OTHER U.S. EPA “WATERSENSE” LABELED AUDITING PROGRAM.
THIS SUBMITTAL HAS BEEN ADAPTED AND MODIFIED FROM THE
APPROVED DESIGN REVIEW LANDSCAPE SUBMITTAL DATED
8/19/19 PREPARED BY QUADRIGA LANDSCAPE ARCHITECTURE &
PLANNING, INC. ELEMENTS OF THIS DESIGN HAS BEEN UTILIZED TO MEET THE DESIGN INTENT OF THE APPROVED DRAWINGS.
C
O
TA
TI H
O
T
E
L
IM
P
R
O
V
E
M
E
N
T
P
L
A
N
S
1 4
7 S
T. J
O
S
E
P
H
W
AY
C
O
TA
TI, C
A
DATE: MLA JOB #: SCALE: DRAWN:
2022-04
1" = 20' DM
L18
SHEET L18 OF 19
L
A
N
D
S
C
A
P
E
D
E
TAIL
S
7/17/23
C2023 MACNAIR LANDSCAPE ARCHITECTURE, NOT FOR GENERAL USE OR PUBLICATION, ALL RIGHTS RESERVED. THESE DRAWINGS AND SPECIFICATIONS ARE THE PROPERTY OF MACNAIR LANDSCAPE ARCHITECTURE. MACNAIR
LANDSCAPE ARCHITECTURE IS NOT RESPONSIBLE FOR THE ACCURACY OF ANY PLANS OR SURVEYS NOT DIRECTLY PREPARED BY THEM. SITE DIMENSIONS, GRADES, WATER
PRESSURES AND GENERAL CONDITIONS SHALL BE VERIFIED
PRIOR TO BEGINNING OF ANY WORK ON SITE. WRITTEN
DIMENSIONS SHALL TAKE PRECEDENCE OVER SCALED
DIMENSIONS.
L A N D S C A P E
A R C H I T E C T U R E
P O S T O F F IC E B O X 2 5 1
K E N W O O D , C A L I F O R NIA 9 5 4 5 2
TEL (707) 833-2288
RLA #2800
[email protected]
MACNAIR
A
P
N
#
0 4
3 -13
4 -
0 2
0 NO. 2800
EXP. 8/31/25
2 2-0
4 C
otati Base 07012
3.vwx
REV NO. DATE DESCRIPTION
DETAIL HYDROZONE TABLE
Name Method Water Use Water Use Value Hydrozone Area in SF % of Landscape
1 Sub-Surface Dripline Low 0.3 1,422.05 sf 5.2%
2 Root Watering System Low 0.3 282.74 sf 1.0%
3 Sub-Surface Dripline Low 0.3 1,274.10 sf 4.7%
4 Root Watering System Moderate 0.6 148.78 sf 0.5%
5 Sub-Surface Dripline Moderate 0.6 588.38 sf 2.2%
6 Sub-Surface Dripline Low 0.3 1,164.10 sf 4.3%
7 Root Watering System Low 0.3 169.63 sf 0.6%
8 Root Watering System Low 0.3 282.72 sf 1.0%
9 Eco-Mat Low 0.3 586.43 sf 2.2%
10 Sub-Surface Dripline Low 0.3 1,896.40 sf 7.0%
11 Sub-Surface Dripline Low 0.3 1,642.07 sf 6.0%
12 Root Watering System Low 0.3 424.10 sf 1.6%
13 Sub-Surface Dripline Low 0.3 1,687.07 sf 6.2%
14 Root Watering System Low 0.3 424.08 sf 1.6%
15 Sub-Surface Dripline Low 0.3 1,397.26 sf 5.1%
16 Sub-Surface Dripline Low 0.3 1,371.96 sf 5.0%
17 Eco-Mat Low 0.3 1,424.43 sf 5.2%
18 Sub-Surface Dripline Low 0.3 926.76 sf 3.4%
19 Sub-Surface Dripline Moderate 0.6 1,005.17 sf 3.7%
20 Sub-Surface Dripline Low 0.3 397.45 sf 1.5%
21 Root Watering System Moderate 0.6 282.74 sf 1.0%
22 Sub-Surface Dripline Low 0.3 814.68 sf 3.0%
23 Sub-Surface Dripline Low 0.3 1,406.24 sf 5.2%
24 Root Watering System Moderate 0.6 254.44 sf 0.9%
25 Sub-Surface Dripline Low 0.3 1,218.41 sf 4.5%
26 Sub-Surface Dripline Low 0.3 1,305.54 sf 4.8%
27 Sub-Surface Dripline Low 0.3 980.57 sf 3.6%
28 Root Watering System Very Low 0.1 180.00 sf 0.7%
29 Sub-Surface Dripline Low 0.3 786.32 sf 2.9%
30 Root Watering System Moderate 0.6 175.47 sf 0.6%
31 Eco-Mat Low 0.3 905.20 sf 3.3%
32 Sub-Surface Dripline Moderate 0.6 424.22 sf 1.6%
27,250 sf 100%
SUMMARY HYDROZONE TABLE
Plant Type Water Use By Area % of Landscape Very Low 180.00 1% Low 24,190.34 89%
Moderate 2,879.20 11%
High 0.00 0%
Total 27,249.53 100% PRECIPITATION RATES BY VALVE
Valve ID Hydrozone Area Flow in GPM
Precipitation Rate in Inches Per Hour
1 1422.054 10.1 GPM 0.68
2 282.737 4.5 GPM 1.53
3 1274.103 9.0 GPM 0.68
4 148.783 3.5 GPM 2.26
5 588.375 3.3 GPM 0.53 6 1164.097 7.6 GPM 0.63
7 169.628 3.0 GPM 1.70
8 282.724 4.5 GPM 1.53
9 586.433 5.1 GPM 0.84
10 1896.401 11.4 GPM 0.58
11 1642.068 11.2 GPM 0.66
12 424.104 7.5 GPM 1.70
13 1687.071 11.8 GPM 0.68
14 424.081 7.3 GPM 1.65
15 1397.256 9.7 GPM 0.67
16 1371.959 9.7 GPM 0.68
17 1424.429 12.4 GPM 0.84
18 926.763 5.9 GPM 0.62
19 1005.166 6.3 GPM 0.60
20 397.449 2.3 GPM 0.57 21 282.737 5.0 GPM 1.70
22 814.683 5.8 GPM 0.68
23 1406.239 13.2 GPM 0.91 24 254.442 4.3 GPM 1.61 25 1218.415 5.7 GPM 0.45 26 1305.543 8.5 GPM 0.62
27 980.575 5.7 GPM 0.56
28 180 2.5 GPM 1.34
29 786.325 4.1 GPM 0.51 30 175.47 5.5 GPM 3.02
31 905.204 8.3 GPM 0.89 32 424.222 2.0 GPM 0.45
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ELECTRIC CONTROL VALVE WITH SHUT OFF
18" MIN.
12" MIN./24" MAX.
NTS
NOTES:
1) INSTALL CONTROL VALVES A MINIMUM OF 18" FROM STRUCTURES OR HARDSCAPING. 2) INSTALL VALVES IN PLANT BEDS WHEREVER POSSIBLE. 3) PLACE VALVE BOX AT RIGHT ANGLES TO STRUCTURES OR HARDSCAPING. 4) INSTALL VALVE BOX SO THAT TOP OF BOX IS FLUSH WITH ADJACENT HARDSCAPING. 5) PLACE AGGREGATE PRIOR TO INSTALLATION OF VALVE BOX. 6) INSTALL VALVE BOXES SO THAT TOP OF BOX IS FLUSH WITH ADJACENT HARDSCAPE. 7) INSTALL ONE BALL VALVE IN BOX IMMEDIATELY UPSTREAM FROM EACH REMOTE CONTROL VALVE. 12"
6" MIN.
2", Typical All
Valve Boxes
6" 12" MIN.
18 Ma "le Adaptor
FLOW
Square Plastic Valve Box With
Bolt Down Cover, And Box
Extension If Req'D. Heat Brand
Controller Station Number On Box
Cover.
To Sprinkler - Angle Pipe To
Specified Depth With 45° Ells
"Snap-Tite" Waterproof
Connectors
Electric Control Valve
Pig Tail Expansion Loop (Min. 18")
Plastic Valve Box And Locking
Cover W/ G.V. Heat Branded On
Cover, Refer To Specifications.
Ball Valve, See Legend
PVC Union
3/4" Washed Crushed
Aggregate Base
Masonry
Brick,Typ. (2)
Places
PVC Sch 80
Nipple, Typ.
Finish Grade Before
Planting
PVC Union, Both Sides
Of RC Valve
Control & Common
Wires, Below Main
Bundle & Tape Every 10'
3/4" Washed Crushed
Aggregate
NOTES:
1) CENTER VALVE BOX OVER VALVE ASSEMBLY. 2) LOCATE VALVE BOXES IN GROUND COVER/SHRUB AREAS WHEN POSSIBLE. 3) SET VALVE BOXES PARALLEL TO EACH OTHER AND PERPENDICULAR TO EDGE.
PLAN VIEW
18"
12" 12" 12" 12" 12"
Concrete Curb, Walk Or
Header
Valve Boxes, Typical
Ball Valve
Quick Coupler
(where Specified)
VALVE BOX LAYOUT
NTS
18" MIN.
2"
Lasco Pre-Fabricated 3/4" 3-Way Swing Joint Assembly
2 Common Bricks
Sch 80 PVC Riser
Quick Couple Valve, Install
2" Below Finish Grade in
10" Dia. Poly Box as
Specified
Finish Grade Before
Planting
3/4" Washed Crushed
Aggregate Base
12" Sch 80 PVC Nipple
PVC Main Line
PVC Tee or Ell
QUICK COUPLER DETAIL
NTS
NOTES
1) LOCATE HEAD 6" FROM ALL EDGES IN LAWN AREAS. LOCATE HEAD 12" FROM ALL EDGES IN SHRUB AREAS. 2) LOCATE STREAM SPRAY AND BUBBLERS HEADS 6" FROM ALL EDGES. 3) USE TEFLON PASTE ON ALL MALE THREADS.
INCLUDES 4", 6" AND 12" POP-UP SPRINKLER DETAIL
NTS
12" MIN.
1"
Lasco Pre-Fabricated 3/4" 3-Way Swing Joint Assembly
Non-Pressure Lateral
Line & Fitting
Finish Grade Before
Planting
Level of Mulch
3" - 12" Pop-Up Sprinkler
1/2" In Seed, 1" In Sod &
Planting Beds
3/4" Sch 80 PVC Nipple
(Adapt Length To Fit), 1/2" Sch 80 Okay On 1/2" Inlets
Cap Side Inlet Do
Not Use
90° Tee
Or Ell
NTS
PIPE INSTALLATION
IN PLANTED AREA
18" MIN.
12" MIN.
6" TYP.
1) PIGTAIL AND LOOP CONTROL WIRE AT ALL CHANGES IN DIRECTION. 2) PROVIDE 18" EXPANSION LOOP AT ALL 90° ANGLES, AND EVERY 100' OF STRAIGHT CURVE RUN.
NOTE:
FINISH PLANTING GRADE
CLEAN BACKFILL, 90%
COMPACTION REQ'D
NON-PRESSURE LATERAL LINE, SNAKE PIPE IN TRENCH
PRESSURE SUPPLY LINE, SNAKE PIPE IN TRENCH
CONTROL WIRES - BUNDLE
AND TAPE AT 10'-0" O.C. AND
INSTALL ADJACENT TO &
BELOW PRESSURE SUPPLY
PROVIDE 2" OF
CLEAN BACKFILL
NTS
PIPE INSTALLATION
UNDER PAVING
1) ALL SLEEVES TO BE SCH 40 PVC. 2) EXTEND ALL SLEEVES 12" BEYOND EDGE OF HARDSCAPING AT BOTH ENDS.
NOTES:
6" TYP.
2"
2 4" MIN.
NON-PRESSURE LATERAL LINE
SLEEVE TWICE DIA. OF
NON-PRESSURE LATERAL LINE
CLEAN BACKFILL, 90%
COMPACTION
CONTROL WIRE SLEEVE - SIZE AS
REQ'D, INSTALL ADJ. TO
PRESSURE SUPPLY LINE
PROVIDE 2" CLEAN BACKFILL
PRESSURE SUPPLY LINE SLEEVE - SIZE TWICE DIA. OF PRESSURE
SUPPLY LINE
POLY TO PVC COMPRESSION
FITTING DETAIL
NTS
3" MULCH
FINISH GRADE
1/2" COUPLING ST
1/2" .700
COMPRESSION
FITTING, GLUE TO
3/4" PVC HEADER COUPLING COUPLING
3/4 X 3/4 X 1/2
TEE, SST
1/2 X 12" FLEXIBLE
RISER AS
MANUFACTURED BY
ORBIT, OR EQUAL
LANDSCAPE
DRIPLINE
DRIP CIRCUIT LAYOUT
PLAN
12" OC, Typ.
RAINBIRD 1/2" AIR RELIEF
VALVE, MODEL AR-12;
INSTALL IN VALVE BOX AT
HIGH POINTS IN DRIP ZONE 3/4" PVC HEADER
3/4" BALL VALVE IN VALVE BOX
AT HEADER AS FLUSH POINT
3/4" PVC HEADER
3/4" PVC SCH 40
LATERAL
F
V
RAINBIRD "LANDSCAPE
DRIPLINE", PARALLEL ROWS
SPACED AS NOTED, 3" BELOW
GRADE; EMITTER @ .6 GPH
(OR AS INDICATED)
NTS
NTS
SHRUB PLANTING DETAIL
2 X ROOTBALL
WIDTH
E
QUAL HEIGHT
OF R
O
O
T
B
ALL
3" Tall Earth Berm, Do Not
Place Mulch in Basin
Backfill Mix and Fertilizer. See Specifications.
Dig Hole 2 Times the Rootball
Diameter and Equal the
Rootball Height.
#1 or #5 Size Containerized
Plant Material
Set Rootball Crown 1" above
Finish Grade
5'
NOTE:
1) DO NOT PLACE MULCH IN TREE BASIN. 2) DETAIL NOT TO SCALE.
PREVAILING WIND
2-8' X 2" DIA. PRESSURE
TREATED LODGEPOLE STAKES; TOP OF STAKE 6" BELOW LOWEST
MAIN BRANCH
3 - 22" CORDED RUBBER TREE
TIES. NAIL TO STAKE. STAKE TO
BE 12" INTO UNDISTURBED SOIL
AND A MINIMUM OF 3'-0" IN THE
GROUND.
SET CROWN OF ROOTBALL 1" ABOVE FINISH GRADE
4" TALL EARTH BERM
BACKFILL MIX AND FERTILIZER. SEE SPECIFICATIONS
DIG HOLE 2 TIMES THE
ROOTBALL DIAMETER AND EQUAL
TO THE ROOTBALL HEIGHT.
NTS
TREE PLANTING DETAIL
NTS
TREE WELL WITH
ROOT BARRIER
NOTE:
1) DO NOT PLACE MULCH IN TREE BASIN. 2) PLANTING HOLE TO BE TESTED FOR DRAINAGE PRIOR TO PLANTING. IF HOLES DO NOT DRAIN WITHIN 4 HOURS CONTACT LANDSCAPE ARCHITECT. 3) INSTALL ROOT BARRIER ON ALL FOUR SIDES OF PLANTER. 4" EQUAL EQUAL
EXISTING OR NEW
CONCRETE PAVEMENT
SET CROWN OF ROOTBALL 1" ABOVE FINISH GRADE
24" ROOT CONTROL BARRIER.
INSTALL WHERE TREE IS 7’ OR LESS
OF ANY HARDSCAPE EDGE. SEE
PLAN FOR ADDITIONAL LOCATIONS
OF BARRIERS
3/4" to 1-1/2" GRAVEL OR
CRUSHED ROCK
BACKFILL MIX AND FERTILIZER. SEE SPECS, SECTION 02800
MAWA AND ETWU CALCULATIONS
1) Maximum Applied Water Allowance (MAWA) MAWA = (ETo) (0.62) [(0.55 X LA) + (0.45 X SLA)] Where: ETo = Annual Net Reference Evapotranspiration (Inches) 0.45 = ET Adjustment Factor (Commercial) 0.55 = ET Adjustment Factor (Residential) LA = Landscaped Area (square feet) 0.62 = Conversion factor (to gallons per square foot) SLA = Portion of the landscape area identified as Special Landscape Area (square feet) 0.45 = the additional ET adjustment factor for Special Landscape Area (1.0 - 0.55 = 0.45) (Commercial) 0.55 = the additional ET adjustment factor for Special Landscape Area (1.0 - 0.45 = 0.55) (Residential) Commercial (C) or Residential (R) C A) Net Evapotranspiration Calculation
Local Reference ETo 45.51 27.12"/yr X .25 = 6.78
(Annual Rainfall) (Effective Rainfall) Net Evapotranspiration Calculation = Annual ETo - Effective Rainfall = 38.73 B) Adjusted Landscape Area Calculation 27,250 sf X 0.45 = 12,262.33 sf (Landscape Area) Adjustment Factor 0.00 sf X 0.55 = 0.00 sf (Special Landscape Area) Adjustment Factor Sum of Adjusted Landscape Area = 12,262.33 sf MAWA= 38.73 X .62 X 12,262 sf = 294,450 gal/yr
2) Estimated Total Water Use (ETWU) A) Net Evapotranspiration Calculation = 38.73 sf Net Evapotranspiration Calculation = Annual ETo - Effective Rainfall B) Adjusted Landscape Area Calculation 180.00 sf X .1 18.00 sf Very Low Water Use 24,190 sf X .3 7,257.10 sf Low Water Use 2,879 sf X .6 1,727.52 sf Moderate Water Use 0.00 sf X .8 0.00 sf High Water Use Sum of Adjusted Landscape Area = 9,002.62 sf ETWU = 38.73 X .62 X 9,003 sf / 0.81 = 270,220 gal/yr
Irrigation Efficiency Factor
Square Footage of Landscape on Drip 27,249.63 sf
Square Footage of Landscape on Spray 0.00 sf
Total Square Footage of Landscape 27,249.63 sf
Adjusted Irrigation Efficiency Factor 0.81
L18
A
L18
B
L18
C
L18
D
L18
E
L18
F
L18
G
L18
H
L18
I
L18
J
L18
K
THESE DRAWINGS COMPLY WITH THE CRITERIA OF THE ORDINANCE. ORDINANCE REQUIREMENTS HAVE BEEN APPLIED FOR THE EFFICIENT
USE OF WATER IN THE IRRIGATION DESIGN PLAN AND THE LANDSCAPE DESIGN PLAN.”
C
O
TA
TI H
O
T
E
L
IM
P
R
O
V
E
M
E
N
T
P
L
A
N
S
1 4
7 S
T. J
O
S
E
P
H
W
AY
C
O
TA
TI, C
A
DATE: MLA JOB #: SCALE: DRAWN:
2022-04
1" = 20' DM
L19
SHEET L19 OF 19
L
A
N
D
S
C
A
P
E
S
P
E
CIFIC
A
TIO
N
S
7/17/23
C2023 MACNAIR LANDSCAPE ARCHITECTURE, NOT FOR GENERAL USE OR PUBLICATION, ALL RIGHTS RESERVED. THESE DRAWINGS AND SPECIFICATIONS ARE THE PROPERTY OF MACNAIR LANDSCAPE ARCHITECTURE. MACNAIR
LANDSCAPE ARCHITECTURE IS NOT RESPONSIBLE FOR THE ACCURACY OF ANY PLANS OR SURVEYS NOT DIRECTLY PREPARED BY THEM. SITE DIMENSIONS, GRADES, WATER
PRESSURES AND GENERAL CONDITIONS SHALL BE VERIFIED
PRIOR TO BEGINNING OF ANY WORK ON SITE. WRITTEN
DIMENSIONS SHALL TAKE PRECEDENCE OVER SCALED
DIMENSIONS.
L A N D S C A P E
A R C H I T E C T U R E
P O S T O F F IC E B O X 2 5 1
K E N W O O D , C A L I F O R NIA 9 5 4 5 2
TEL (707) 833-2288
RLA #2800
[email protected]
MACNAIR
A
P
N
#
0 4
3 -13
4 -
0 2
0 NO. 2800
EXP. 8/31/25
2 2-0
4 C
otati Base 07012
3.vwx
REV NO. DATE DESCRIPTION
DIVISION 2 SITE WORK
SECTION 02750
UNDERGROUND IRRIGATION SYSTEM
PART 1 GENERAL
1.01 SCOPE
A. Work Included: perform all work necessary and required for the construction of the project as indicated. Such work includes but is not limited to the following:
1. Furnish and install complete irrigation system. 2. Trenching and backfilling. 3. Sleeves for irrigation piping and remote control valve wiring under pavements and walls as noted.
B. Related Work in Other Sections: The following items of associated work are included in other sections of these specifications:
1. Landscaping, Section 02800
C. By Others: The following items of work will be performed by others and are not included in the contract.
1. Electrical stub-out for irrigation controller. 2. Irrigation water meter. 3. Water stub-out(s) for irrigation system.
1.02 INSPECTION OF CONDITIONS: Examine related work and surfaces before starting work of this section. Report to the landscape architect, in writing, conditions which will prevent the proper provision of this work. Beginning the work of this section without reporting unsuitable conditions to the landscape architect constitutes acceptance of conditions by the contractor. Any required removal, repair, or replacement of this work caused by unsuitable conditions to be done at no additional cost to the owner.
1.03 CODES, RULES AND SAFETY ORDERS
A. All work and materials to be in full accordance with the latest rules and regulations of safety orders of Division of Industrial Safety; the Uniform Plumbing Code published by the Western Plumbing Officials' Association; and other applicable laws or regulations, including the presiding local plumbing code. Nothing in these drawings or specifications is to be construed to permit work not conforming to these codes. Should the construction documents, or instructions, be at variance with the aforementioned rules and regulations, notify the landscape architect and get instructions before proceeding with the work affected.
B. Furnish and maintain all warning signs, shoring, barricades, red lanterns, etc., as required by the Safety Orders of the Division of Industrial Safety and local ordinances.
C. Contact U.S.A. for location of underground utilities.
1.04 STANDARDS: American Society of Testing and Materials (ASTM).
1.05 PERMITS AND FEES: Obtain all permits and pay required fees to any governmental agency having jurisdiction over the work. Arrange inspections required by local agencies and ordinances during the course of construction as required.
1.06 APPROVAL: Wherever the terms "approve", "approval", or "approved" are used in the specifications, they mean approval of landscape architect in writing.
1.07 WORK SCHEDULE: Submit a proposed work schedule to
landscape architect at least 5 days prior to start of work under this Section. After approval, no modification shall be made to this schedule with out written authorization by the landscape architect.
1.08 OBSERVATION SCHEDULE
Schedule a job start meeting with the landscape architect at least 5 days before beginning work under this Section. All requests for observation must be made 72 hours in advance.
A. Job start meeting
The purpose of this conference is to review questions the contractor may have regarding the work, administrative procedures during construction and project work schedule.
B. Irrigation installation and hydrostatic tests Observation of installation and hydrostatic test results to be made by the landscape architect prior to backfilling of trenches.
C. Pre-maintenance When all work has been completed a pre-maintenance walk-through will be conducted. If approved, the 90 calendar day maintenance period will begin.
D. Final Observation
Final Observation will be after the 90 calendar day maintenance period and all required work is completed. Please give 1 week notice for this observation meeting.
1.09 SUBSTITUTIONS
A. Specific reference to manufacturer's names and products specified in this Section are used as standards, but this implies no right to substitute other material or methods without written approval of the landscape architect.
B. Installation of any approved substitution is contractor's responsibility. Any changes required for installation of any approved substitution must be made to the satisfaction of the landscape architect and without additional cost to the owner.
1.10 PROTECTION OF EXISTING CONDITIONS
A. Contractor shall acquaint themself with all site conditions. Should utilities or other work not shown on the plans be found during excavations, contractor shall promptly notify landscape architect for instructions as to further action. Failure to do so will make contractor liable for any and all damage thereto arising from their operations subsequent to discovery of such utilities not shown on plans.
1.11 COORDINATION: Coordinate and cooperate with other contractors to enable the work to proceed as rapidly and efficiently as possible.
1.12 PRODUCT HANDLING: Protect work and materials under this Section from damage during construction and storage. Protect polyvinyl chloride (PVC) pipe and fittings from direct sunlight. Beds on which PVC is stored must be full length of pipe. Do not use any pipe or fitting that has been damaged or dented.
1.13 SAMPLES: Landscape architect reserves the right to take and analyze samples of materials for conformity to specifications at any time. Contractor shall furnish samples upon request by the landscape architect. Rejected material shall be removed from the site immediately and replaced at the contractors expense. Cost of testing materials not meeting specifications shall be paid by contractor.
1.14 HYDROSTATIC TESTS
A. Make hydrostatic tests when welded PVC joints have cured at least 24 hours. Apply continuous static water pressure of 100 psi as follows:
1. All piping on the pressure side of control valves shall be tested for two hours. 2. At completion of hydrostatic test, mainline shall be opened at farthest most point from the location of the pump to verify continuity of the mainline.
B. Leaks resulting from tests shall be repaired and tests repeated until system passes tests.
1.15 "AS-BUILT" IRRIGATION DRAWINGS: Contractor shall furnish Record Drawings of the complete irrigation system. Procure from the landscape architect full sized sepias of Contract Drawings. Construction drawings shall be on the construction site at all times while the irrigation system is being installed. Actual location of valves and all irrigation and drainage piping shall be shown on the prints by dimensions from easily identified permanent features, such as buildings, curbs, fences, walks or property lines. Drawings shall show approved substitutions, if any, of material including manufacturer's name and catalog number. The drawings shall be at scale and all indications shall be neat. All information noted on the print shall be transferred to the prints by contractor and all indications shall be recorded in a neat, orderly way. The record drawings shall be turned over to the landscape architect at or before the Final Acceptance of the project.
1.16 CONTROLLER CHARTS
1. As-built drawings shall be approved by the landscape architect before charts are prepared. 2. Provide one controller chart for each controller supplied. 3. The chart shall show the area controlled by automatic controller and shall be the maximum size controller door will allow. 4. The chart is to be reduced drawing of the actual as-built system. However, in the event the controller sequence is not legible when the drawing is reduced, it shall be enlarged to a size that will be readable when reduced.
5. Chart shall be black line print and a different color shall be used to show area of coverage for each station. 6. The chart shall be mounted using Velcro, or an approved equal. 7.When completed and approved, the chart shall be hermetically sealed between two pieces of plastic, each piece being a minimum 20 mils. thick. 8. These charts shall be completed and approved prior to final inspection of the irrigation system.
1.17 MATERIALS TO BE FURNISHED
A. Prior to final inspection the contractor shall furnish the following materials to the owner:
1. Two wrenches for disassembling and adjusting each type of sprinkler head supplied. 2. Two keys for each automatic controller. 3. Four keys for loose key hose bibs and/or hose bibs. 4. Twelve 12 inch pop-up sprinkler bodies.
1.18 CLEAN-UP: Keep all areas of work clean, neat and orderly at all times. Keep paved areas clean during installation. Clean up and remove all debris from the entire work area prior to Final Acceptance to satisfaction of landscape architect.
1.19 FINAL ACCEPTANCE: Work under this Section will be accepted by landscape architect upon satisfactory completion of all work. Upon Final Acceptance, owner will assume responsibility for maintenance of the work. Said assumption does not relieve contractor of obligations under Warranty.
1.20 WARRANTY: In addition to manufacturer's guarantees or warranties, all work shall be warranted for one year from the date of Final Acceptance against defects in material, equipment and workmanship by contractor. Warranty shall also cover repair of damage to any part of the premises resulting from leaks or other defects in materials, equipment and workmanship to the satisfaction of the owner.
PART 2 MATERIALS
2.01 GENERAL: Materials throughout the system shall be new and in perfect condition. At least 14 days prior to beginning work, submit for approval 2 copies of manufacturer's catalog cuts, specifications, and operating instructions of the complete list of materials and assemblies to be installed. Quantities of materials and equipment need not be included. No deviations from the specifications shall be allowed. The decision of the landscape architect shall be final in the determination of the quality of materials and equipment.
2.02 WATER METERS: Shall be provided by others.
2.03 PIPE
A. Mainline piping on pressure side of irrigation control valves:
1. 2" size and greater to be Polyvinyl Chloride (P.V.C.) 1120-1220, Class 315 and shall conform to ASTM D 2241-73 and D 2672-73. 2. Up to and including 1-1/2" size to be Polyvinyl Chloride (P.V.C.) 1120-1220, Schedule 40 and shall conform to ASTM D 1785-73. 3. Galvanized Steel: Standard wall, Schedule 40, capable of working pressure up to 600 psi shall run from the point of connection to back flow prevention device. 4. Piping from the point of connection to the back flow prevention device shall be as approved by local code.
B. Lateral line piping on non-pressure side of irrigation control valves:
1. 2" size and greater to be Polyvinyl Chloride (P.V.C.) 1120-1220, Class 315 and shall conform to ASTM D 2241-73 and D 2672-73. 2. Up to and including 1-1/2" size to be Polyvinyl Chloride (P.V.C.) 1120-1220, Schedule 40 and shall conform to ASTM D 1785-73.
2.04 FITTINGS
A. PVC Fittings: Schedule 40, Polyvinyl Chloride, high impact weight, as manufactured by Sloane, Lasco, medium or approved equal.
B. Fittings for Galvanized Steel Pipe: Schedule 40, standard weight as manufactured by Grinnell, or approved equal.
C. Connections between main and valves shall be PVC Schedule 80 nipples and fittings.
2.05 SLEEVE MATERIALS
A. For Control Wires: PVC 1120-1220, Class 200 pipe or heavy wall galvanized steel conduit.
B. For Water Lines: PVC 1120-1220, Class 200 pipe or heavy wall galvanized steel conduit.
2.06 IRRIGATION CONTROLLERS
A. Controller to be as shown on plans and is to be installed as per detail and manufacturer's specifications.
2.07 IRRIGATION CONTROL VALVES
A. Remote Control Valves: Valves to be as shown on plans and installed per details and manufacturer's specifications.
2.08 CONTROL WIRE
A. Wire: Solid copper wire, U.L. approved for direct burial in ground. Minimum gauge: #14. Common ground wire shall be white.
B. Splicing Materials: Wire connectors shall be Pentite or snap connectors.
C. All wires shall be labeled with the valve number at the controller and valve.
D. 120 wiring shall be as required by local code and installed by an electrician. It shall not be on a switched circuit.
E. Common wire shall be white. Control wires shall be other than white. Use a different color control wire for each controller.
2.09 VALVE BOXES
A. Remote Control Valves: To be Brooks, Green or approved equal, one per valve.
B. Gate Valves and Control Wire Stub-out Locations: To be Brooks, Green or approved equal, one per valve or stub-out location.
2.10 QUICK-COUPLING VALVES
A. Quick coupling valves to be as per plans and details.
B. Furnish 2 valve keys fitted with hose valve assembly.
C. All valve boxes shall be purple in color or clearly labeled by the manufacturer to designate reclaimed water.
2.11 LANDSCAPE DRIP-LINE: Tubing as shown in legend and drawings.
A. Install in parallel and consistent rows at spacing indicated in all specified areas.
B. Install 3" below grade.
2.12 SPRINKLER HEADS
A. Heads as shown in legend and drawings.
2.13 BACK-FLOW PREVENTION ASSEMBLIES
A. Back-flow prevention device as shown in legend and drawings.
PART 3 EXECUTION
3.01 LAYOUT
A. Layout work as accurately as possible to drawings. Drawings are diagrammatic to the extent that swing joints, offsets and all fittings are not shown.
B. Full and complete coverage is required. Contractor shall make any necessary minor adjustments to layout required to achieve full coverage of irrigated areas at no additional cost to owner.
C. Dig trenches wide enough to allow a minimum of 6 in. between parallel pipe lines. Trenches shall be of sufficient depth to provide minimum cover from finish grade as follows:
1. Over PVC pipe on pressure side of irrigation control valve, control wires and quick coupling valves: 18 inches. 2. Over pipe on non-pressure side of irrigation control valve: 12 inches.
3.03 BACK FLOW PREVENTION DEVICE INSTALLATION
A. Install according to local code and manufacturer's instructions.
B. Install with union on discharge side for servicing, or with flanges, as required.
3.04 SLEEVING
A. Where pipes or wires must be installed under paving place them in sleeves with a 24" minimum depth and sufficient size to accommodate irrigation lines and/or wires.
B. Lack of pipe chase coordination does not relieve the contractor from installing the pipes and control wire shown on the drawing. In the event pipe chases were not installed prior to paving the contractor shall bore under the paving to accommodate pipes and wires.
C. All control wire shall be in Schedule 40 conduit from trench to controller. When valves are grouped together allow 12" between valve boxes, each valve in a separate box, (not to be placed in drainage swales, but kept in ground cover areas.)
3.05 PIPE LINE ASSEMBLY
A. Install pipe in accordance with manufacturer's instructions.
B. Solvent weld all PVC pipe and fittings using solvents (including primer) and methods as recommended by the manufacturer, except where screw connections are required. Clean pipe and fittings of dirt and moisture before assembly. PVC pipe may be assembled on ground surface beside trench. Snake pipe from side to side of trench bottom to allow for expansion and contraction. Make all connections between PVC pipe and metal valves or pipe with threaded fittings using PVC male adapters.
C. Use Teflon tape on all threaded fittings.
D. Thrust blocks shall be installed where the irrigation main changes direction as at ells and tees and where the irrigation main terminates. Pressure tests shall not be made for a period of 36-48 hours following the completion of pouring of the thrust blocks. Concrete thrust blocks for supply mains shall be sized and placed in strict accordance with the pipe manufacturer's specifications and shall be of an adequate size and so placed as to take all thrust created by the maximum internal water pressure.
3.06 IRRIGATION CONTROL VALVES:
A. Install control valves in valve boxes where shown and group together where practical. Place no closer than 18 in. to walk edges, buildings and walls and other valves. Valve boxes shall be placed in relation to finish grade as follows:
1. 1" above grade when no mulch is used
2. 1/2" with seeded lawn
3. 1 1/2" with sod lawn
4. 2" with plant beds
B. The contractor shall paint on the cover of each valve box in 2" white stenciled letters with the value number as designated on the plan.
C. Clearance between the highest part of the valve and the bottom of the valve box lid shall be 2" minimum and 4" maximum. (Lid must not rest on any part of valve and valves must not be buried too deep for convenient access.) D. Clearance between the top of the piping and the bottom of the valve box and/or the valve box knock outs, shall be a minimum of 2". (The box must not rest on the piping.)
E. Clearance between the valve and the sides of the valve box shall be a minimum of 3".
3.07 SPRINKLER HEADS
A. Install heads as per details.
B. Nozzles may be changed to control precipitation rate and G.P.M. with approval from the landscape architect.
3.08 QUICK COUPLING VALVES: Quick coupling valves to be installed as per detail.
3.09 AUTOMATIC CONTROLLER
A. Install per local code and manufacturer's instructions.
B. Grounding of Irrigation controller shall be as per manufacturer's recommendations and as per local code.
3.10 CONTROL WIRING
A. Install control wires with sprinkler mains and laterals in common trenches wherever possible. Lay to the side of pipe line. Provide looped slack at valves of 18" and snake wires in trench to allow for contraction of wires. Tie wires in bundles at 10 ft. intervals. Provide expansion loop at all 90 degree angles, and every 100' of straight wire run.
B. Control wire splices at remote control valves to be crimped and sealed with specified splicing materials. Line splices will be allowed only on runs of more than 500 ft. All line splices to be in separate valve box.
C. Install one continuous ground wire and one extra wire to all valves.
3.11 CLOSING OF PIPE AND FLUSHING OF LINES
A. Thoroughly flush out all water lines before installing heads, valves and other hydrants.
B. Test as specified.
3.12 PRESSURE TESTS
A. The contractor shall partially backfill, leaving all fittings exposed before testing.
B. Cap all valve openings and test the mainline pipe at full line working pressure and visually check all fittings.
3.13 BACKFILL AND COMPACTING
A. After system is operating and required tests and inspections have been made, backfill excavations and trenches with clean soil, free of rubbish. All pipe shall have a bedding of 2" under and 4" over of select, rock free backfill.
B. Backfill for all trenches, regardless of the type of pipe covered, shall be compacted to minimum 95% density under pavements, 85% under planted areas.
C. Compact trenches in areas to be planted by thoroughly flooding the backfill. Jetting process may be used in those areas.
D. Dress off all areas to finish grades.
E. Any settling more than 1" which may occur during the guarantee period shall be brought to finish grade by the contractor at his expense.
END OF SECTION 02750
SECTION 02800
LANDSCAPING
PART 1 GENERAL
1.01 SCOPE
A. Work Included: Perform all work necessary and required for the construction of the project as indicated. Such work includes but is not limited to the following:
1. Site preparation including weed and rubble removal. 2. Laboratory soil analysis. 3. Furnishing and spreading topsoil. 4. Finish grading of planted areas. 5. Soil amendment. 6. Planting.
B. Related Work: The following items of associated work are included in other sections of these specifications.
1. Section 02750: Underground Irrigation System.
C. Use Teflon tape on all threaded fittings.
D. Thrust blocks shall be installed where the irrigation main changes direction as at ells and tees and where the irrigation main terminates. Pressure tests shall not be made for a period of 36-48 hours following the completion of pouring of the thrust blocks. Concrete thrust blocks for supply mains shall be sized and placed in strict accordance with the pipe manufacturer's specifications and shall be of an adequate size and so placed as to take all thrust created by the maximum internal B. Related Work: The following items of associated work are included in other sections of these specifications.
1. Section 02750: Underground Irrigation System.
C. By Others: The following items of work will be performed by others and are not included in the contract.
1.02 REQUIREMENTS OF REGULATORY AGENCIES
A. Perform work in accordance with all applicable laws, codes, and regulations required by authorities having jurisdiction over such work and provide for all inspections and permits required by federal, state, and local authorities in furnishing, transporting and installing materials.
B. Certificates of inspection required by law for transportation shall accompany the invoice for each shipment of plants. File copies of certificates with landscape architect after acceptance of material.
Inspections of federal and state governments at place of growth does not preclude rejection of plants at project site.
1.03 SELECTION, TAGGING AND ORDERING OF PLANT MATERIAL
A. Submit documentation to landscape architect at least 7 days prior to start of work under this section that all plant material has been ordered. Arrange procedure for observation with landscape architect at time of submission.
B. Plants shall be subject to observation and approval by landscape architect at place of growth or upon delivery for conformity to specifications. Such approval shall not impair the right of observation and rejection during progress of the work. Submit written request for observation of plant material at place of growth to landscape architect. Written request shall state the place of growth and the quantity and variety of plants to be observed. Landscape architect reserves the right to refuse observation at this time if, in his judgment, a sufficient number of plants are not available for observation or not in the landscape architect's contract.
C. Substitution of plant material will not be permitted unless authorized in writing by landscape architect. If proof is submitted that any plant specified is not obtainable, a proposal will be considered for use of the nearest equivalent size or variety with corresponding adjustment of contract price.
1.04 COORDINATION: Contractor shall coordinate and cooperate with other contractors to enable the work to proceed as rapidly and efficiently as possible.
1.05 INSPECTION OF SITE: Contractor shall visit site and inspect conditions as they exist prior to submitting bid. Site dimensions, water pressure and general conditions shall be verified prior to beginning of any work.
1.06 INTENT OF DRAWINGS AND SPECIFICATIONS: It is the intent of the drawings and specifications to provide planting with plants in vigorous growth, ready for owner's use. Any items not specifically shown in the drawings or called for in the specifications, but normally required to conform with such intent, are to be considered as part of the work. Written dimensions take precedence over scale dimensions.
1.07 APPROVAL: Wherever the terms "approve", "approval" or "approved" are used herein, they mean approval of landscape architect in writing.
1.08 PRODUCT HANDLING
A. Furnish standard products in manufacturer's standard containers bearing original labels showing quantity, analysis and name of manufacturer.
B. Store products with protection from weather or other conditions which would damage or impair the effectiveness of the product.
1.09 PROTECTION OF EXISTING PLANTS TO REMAIN
A. Do not store materials or equipment, permit burning, or operate or park equipment within designated plant protection zones as specified on the plans.
B. Notify landscape architect in any case where contractor feels grading or other construction called for by Contract Documents may damage existing plants to remain. Do not proceed with such work until directed by landscape architect.
C. If existing plants are damaged during construction, contractor shall replace such plants of the same species and size as those damaged at no cost to owner. Determination of extent of damage and value of damaged plant shall rest solely with landscape architect.
1.10 GRADING
A. Prior to planting grading will be brought to within .10 + foot of finish grade with soil suitable for planting by the landscape contractor. It is the responsibility of the landscape contractor to verify that no conflict exists with the grading plan. Fine finish grading will be done by the landscape contractor.
B. Finish grade in ground cover areas shall be 2 inches below surrounding concrete or asphalt. In lawn areas, sodded areas shall be 2 inches and seeded areas shall be 1 inch below sidewalks, header boards, or mow strips and examined by the landscape architect, owner, or his representative.
1.11 CLEAN-UP: Keep all areas of work clean, neat and orderly at all times. Keep all paved areas clean during planting and maintenance operations. Clean up and remove all deleterious materials and debris from the entire work area prior to Final Acceptance to the satisfaction of landscape architect. The landscape contractor shall bear final responsibility for proper surface drainage of planted areas. Any prior work done by another party or obstructions on the site which the contractor feels precludes establishing proper drainage shall be brought to the attention of the landscape architect, owner or his representative for correction or the relief of responsibility.
1.12 SAMPLES, TESTS AND SUBMITTALS: Landscape architect reserves the right to take and analyze samples of materials for conformity to specifications at any time. Contractor shall furnish samples and/or manufacturer's specification sheets for any construction material or item upon request by the landscape architect. Rejected materials shall be immediately removed from the site at contractor's expense. The cost of testing materials not meeting specifications shall be paid by the contractor.
1.13 PROJECT SCHEDULE: Contractor shall submit for approval a complete work schedule indicating tentative dates for inspections. This schedule is to be submitted prior to the job start meeting.
1.14 OBSERVATION SCHEDULE: Schedule a job start meeting with the landscape architect at least 5 days before beginning work under this Section. All requests for observation must be made 72 hours in advance.
A. Job Start Meeting
The purpose of this conference is to review questions the contractor may have regarding the work, administrative procedures during construction and project work schedule. B. Planting - Fine Grading and Soil Preparation The fine grading and soil preparation of all planting areas must be observed prior to installation of plant material. C. Plant Material Landscape architect shall observe plant material for quality prior to planting. Plants shall be subject to observation and approval at place of growth or upon delivery for quality, size and variety; such approval shall not impair the right of inspection and condition of ball and roots, latent defects or injuries. Rejected plants shall be removed immediately from site. D. Plant Layout Layout plants (in containers) in locations shown on drawings. Landscape architect will check location of plants in the field and adjust to exact position before planting begins. Landscape architect reserves the right to refuse inspection if, in his opinion, an insufficient quantity of plants is available for layout check. E. Pre-maintenance When all work has been completed a pre-maintenance walk-through will be conducted. If approved, the 90 calendar day maintenance period will begin. F. Final Observation Final Observation will be after the 90 calendar day maintenance period and all required work is completed. Please give 1 week notice for this observation meeting.
1.15 MAINTENANCE
A. All landscape areas shall be substantially weed free at beginning of maintenance period and at final acceptance.
B. Begin maintenance after each plant and each portion of lawn or ground cover is installed and continue until Final Acceptance.
C. Maintenance Period shall begin upon inspection and approval by landscape architect and shall be for 90 calendar days.
D. Maintenance of new planting shall consist of watering, cultivating, weeding, fertilizing, mulching, re-staking, tightening and repairing of guys, resetting plants to proper grades or upright position, restoration of the plant saucer, and furnishing and applying such sprays and fertilizers as are necessary to keep the plants free of insects and disease and in thriving condition.
E. Protect planting areas and plants at all times against damage of all kinds for duration of maintenance period. Maintenance includes temporary protection fences, barriers and signs as required for protection. If any plants become damaged or injured, treat or replace as directed by landscape architect at no additional cost to owner.
1.16 FINAL ACCEPTANCE: Work under this Section will be accepted by landscape architect upon satisfactory completion of all work, including maintenance, but exclusive of replacement of plant materials under the Warranty Period. Upon Final Acceptance, the owner will assume responsibility for maintenance of the work.
1.17 WARRANTY PERIOD AND REPLACEMENTS
A. Contractor shall warrant that all plant material except annual color planted under this contract will be healthy and in flourishing condition of active growth one year from date of Final Acceptance.
B. Any delay in completion of planting operations which extends the planting period shall extend the Maintenance and Warranty Periods correspondingly.
C. Replace, without cost to owner, and as soon as weather conditions permit, all dead plants and all plants not in vigorous, thriving condition, as determined by landscape architect during and at the end of Warranty Period. Plants shall be free of dead or dying branches and branch tips, and shall bear foliage of a normal density, size and color. Replacements shall closely match adjacent specimens of the same species and shall be subject to all requirements of this specification.
D. Contractor shall not be held responsible for failures due to neglect by owner, vandalism, or acts of god, etc., during Warranty Period. Report such conditions to landscape architect in writing.
PART 2 MATERIALS
2.01 PLANTS
A. Plant Quality: Plants shall be fresh, well established, vigorous, of normal habit of growth, free of disease, insects, insect eggs and larvae. Roots shall be healthy and extend to the bottom and sides of the container, and rooting shall be extensive enough to hold the rood ball together during planting, but not so dense as to discourage root establishment into surrounding soils. Roots shall not show any signs of restriction due to kinked, circular, or distorted growth. No trees will be accepted that will not stand on their own trunks after the nursery stakes have been removed. All plants will be inspected prior to planting and may be rejected if noted quality standards are not met.
B. Plant Quantity: Plant materials shall be furnished in size, quantities, species and at the spacing indicated or as noted on the plans. Ground cover material shall be provided in quantity adequate to fill the entire ground cover areas at the spacing shown.
C. Plant Spacing: No planting, except for ground covers, espaliers and vines shall be placed closer than two feet to pavement, structures or other landscape edges. Ground covers adjacent to pavement, structures or landscape edges shall be no closer to these than 75% of their spacing. No plants that would obstruct the sprinkler coverage shall be placed closer than 30% of the radius of the sprinkler throw as specified by the sprinkler manufacturer at the optimum operating pressure unless approved by the landscape architect.
2.02 LANDSCAPE AREA PLANTING SOILS
A. Soil to be tested by testing agency as per specifications.
B. All landscape area planting soils shall be equal or coarser in texture to the original on-site topsoil. All landscape area soils shall be free from stones larger than 1 in. in size, sub-soil, refuse, plants or roots, clods, weeds, sticks, or other extraneous material. All landscape area soils shall be tested by an approved soils laboratory for horticultural suitability and verified to be capable of sustaining healthy plant life. Landscape area planting soils may be obtained through stockpiling of existing topsoil or imported soil of equal texture and quality as determined by approved soil laboratory analysis.
C. Soil Chemistry: All planting soils shall meet the following soil chemistry parameters.
1. Reaction - pH of saturated paste = 5.5 to 7.5
2. Salinity (Electrical conductivity in mmho/cm) = <4.0
3. Sodium Adsorption Ratio (SAR) = <6.0
4. Sodium = <5.0 milliequivalents per liter 5. Chloride = <5.0 milliequivalents per liter 6. Boron (Parts Per Million in extract) = <1.0 D. Soil Fertility: Adequate amounts of nitrogen, potassium, phosphorus, calcium, and magnesium shall be available to support healthy plant growth. Soil shall be analyzed for fertility and any deficiencies shall be treated with inorganic fertilizer amendments prior to planting.
E. Lime Treated Soil: If lime is used for soil compaction in landscape areas, all lime treated soil shall be removed to a depth equal or more to the depth of the treated soil. Soil shall be replaced with import soil as described in the landscape specifications.
2.03 PREPARATION OF LANDSCAPE AREA PLANTING SOILS
A. Prior to any work in planting areas all construction debris shall be removed.
B. Structural fill and/or compacted engineered fill and/or any other soil deemed unsuitable for horticultural use as defined by Sections 2.02-A, 2.02-B, and 2.02-C shall be excavated and removed to a depth of 12 inches in landscape planting areas by the landscape contractor. Replacement planting soil shall be equal or coarser to the on-site soil in texture. This may be obtained through stockpiling of existing topsoil or imported soil of equal quality as determined by approved soil laboratory analysis. It shall be free from stones larger than 1 in. in size, sub-soil, refuse, plants or roots, clods, weeds, sticks, or other extraneous material. It shall be capable of sustaining healthy plant life.
C. All landscape area soils shall be ripped in two directions to a depth of 12 inches. In areas not accessible by large equipment, ripping shall be accomplished by small backhoe or manually to thoroughly cultivate the soil to a depth of 12 inches.
D. Landscape area planting soil, imported or otherwise, shall be spread evenly over the site. Minimum depth of friable soil shall be 12 inches deep in all landscape planting areas and finish surface shall be within one inch of finish grade.
If imported topsoil is needed, it shall be supplied by the landscape contractor to meet this requirement and shall meet all specifications as defined Sections 2.02-A, 2.02-B, and 2.02-C. Imported landscape area planting soils shall be compacted to 85%± relative compaction. Never apply the topsoil when the site or the topsoil is wet.
2.04 COMMERCIAL FERTILIZER
A. Pre-plant fertilizer for soil incorporation shall consist of the following percent by weight
6% Nitrogen
20% Phosphoric Acid
20% Potash
B. Post Planting/Surface Application Fertilizer:
16% Nitrogen
8% Phosphoric Acid
8% Potash
C. Fertilizer requirement is subject to change based on soil testing for horticultural suitability.
2.05 SOIL AMENDMENTS
A. Organic Amendment: Shall be nitrolized and derived from fir wood residuals.
B. Physical Properties: 1/2" minus fir bark, nitrolized fortified or entranced.
C. Chemical Amendments: As required by soil analysis with approval of landscape architect.
2.06 STAKING MATERIALS
A. Contractor shall use staking materials necessary to meet requirements of specifications, subject to approval of landscape architect.
B. Tree Stakes: 2" x 2" X 8' lodgepole pine pressure treated stakes. Construction heart grade. (Do not drive stakes through the rootball). Use 2 stakes per tree.
C. Tree Ties: Corded rubber tree ties, 18" without wire.
2.07 ROOT BARRIERS
A. "Root Solutions" control planter, or equal. Install according to local code and manufacturer's instructions. Use in all areas where tree is within 7 feet of any walkway, wall, building or other structural edge. Linear type barrier shall be used in all cases. Linear barriers shall be installed a minimum of 7 feet to either side of tree's relative position to sidewalk or structural edge.
B. All root barriers to be 24" deep, interlocking linear panels.
C. All root barriers shall be installed 4" from the back of curb or other hardscape edge with 4" of 3/4" gravel drain rock 24" deep on the root barrier side away from the tree.
2.08 WATER: Furnished by owner. Transport as required.
2.09 MULCH: Fir bark 1" to 2", free of sticks, dirt, dust and other debris, as approved, to a depth of 3" to be placed in all landscaped areas except where flats have been planted or annual beds and drainage swales. Fir bark, 1/2" minus, free of sticks, dirt, dust and other debris, as approved, to a depth of 1" to be placed in all landscaped areas where flats have been planted or in annual beds. Shredded bark mulch shall be used in conjunction with jute netting on all slopes greater than 6:1.
2.10 PRE-EMERGENT WEED CONTROL: All herbicides used to
control weeds shall comply with all governmental regulations and shall be appropriate to weed species. Contact the local county agricultural agent or pest control advisor for proper herbicide recommendations. Follow manufacturers instructions carefully PART 3 EXECUTION
3.01 HANDLING OF PLANT MATERIAL
A. Canned stock shall be removed carefully after cans have been cut on two sides. Do not use spade to cut cans. Do not lift or handle container plants by tops, stems, or trunks at any time.
3.02 PREPARATION OF SUB-GRADE AND/OR EXISTING SOILS
A. Prior to any work in planting areas by landscape contractor, the general contractor shall clear all construction debris from planting areas.
B. Soil shall be ripped in two directions to a depth of 12". In areas not accessible by large equipment, ripping shall be accomplished by small backhoe or manually.
3.03 SPREADING OF TOPSOIL
A. After sub-grade has been prepared, the landscape contractor shall be responsible for furnishing and installing topsoil to within (1) inches of finish grade.
B. Topsoil should be spread evenly over the site. Minimum depth of friable to be 12 inches within five feet of all structures and 24 inches deep in all other areas. If this condition does not exist on the site, the balance of topsoil shall be imported by the landscape contractor to meet this requirement.
Import soil shall be compacted to 85% relative compaction. Never apply the topsoil when the site or the topsoil is wet.
3.04 AMENDMENT OF SOIL
A. Apply amendments to all planting and lawn areas at the following rates per 1,000 sq.ft. at zero to eight inches depth:
8 cubic yards organic amendment as specified. 20 pounds pre-plant fertilizer Additional amendments as determined from soil test B. Incorporate thoroughly with top 8 in. soil layer and remove stones over 1 in. in diameter, roots, clods, weeds, and other extraneous material. Bring amended soil to finish grades and elevations shown on Contract Documents. Do not work soils under frozen or muddy conditions.
3.05 SURFACE DRAINAGE OF PLANTED AREAS: Landscape Contractor shall bear final responsibility for proper surface drainage of planted areas. Any discrepancy in the drawings or specifications, obstructions on the site, or prior work done by another party, which contractor feels precludes establishing proper drainage shall be bought to the attention of landscape architect in writing for correction or relief of said responsibility.
3.06 EXCAVATION OF PLANTING AREAS
A. Excavate container grown tree, shrub, and vine pits to the following dimensions:
1. Two times as large in diameter as the original growing container (Rhododendron and azaleas 3 times the diameter)
2. The depth should be equal to the root ball height.
B. Scarify all sides of planting hole. Auger through structural fill, compacted soil or hardpan if encountered or as directed by landscape architect.
3.07 DRAINAGE, DETRIMENTAL SOIL AND OBSTRUCTIONS
A. Notify landscape architect in writing of all soil or drainage conditions contractor considers detrimental to growth of plant material. State condition and submit proposal and cost estimate for correcting condition.
3.08 PLANTING OPERATIONS
A. Protect plants at all times from sun or drying winds. Plants that cannot be planted immediately on delivery shall be kept in the shade, well protected, and shall be kept well watered.
B. Planting Soil (excluding trees):
2/3 Existing Soil
1/3 Organic Amendments
C. Prior to planting test hole for drainage by filling with water, if hole does not drain within four hours, do not plant. Contact landscape architect.
D. Use planting soil to backfill plant pits. Crown of root ball shall be 1" above finished grade. Set plant plumb and brace rigidly in position until planting soil has been tamped solidly around the ball and roots. When plant pits have been backfilled approximately 2/3 full, water thoroughly, saturating rootball, before installing remainder of the planting soil to top of pit, eliminating all air pockets.
E. Smooth planting areas to conform to specified grades after full settlement has occurred.
F. Form saucer with 4 in. high berm around tree and shrub pits 12 inches wider that the root ball diameter. G. Water all plants immediately after planting.
3.09 STAKING
A. Staking shall be completed immediately after planting. Plants shall stand plumb after staking.
B. Locate stakes in position relative to the prevailing wind as shown on detail.
C. Attach tree straps as per details.
D. Need for auxiliary stake shall be determined in the field by the landscape architect and shall only be used when trees are exceptionally spindly. If necessary, place auxiliary stake adjacent to tree leader and tie with polyethylene nursery tape at 10 inch intervals. Auxiliary stake to be bamboo or equal.
3.10 PRUNING: Prune plants only at the time of planting and according to standard horticultural practices to preserve the natural character of the plant. Trees shall be pruned at the direction of the landscape architect in accordance with current I.S.A. Standards. Remove all dead wood, suckers and broken or badly bruised branches. Use only clean sharp tools. Do not prune to compensate for root loss. Landscape contractor is responsible for replacement of all improperly pruned plant material.
3.11 GROUND COVER PLANTING
A. Plant ground cover plant at optimum depth for proper growth. Do not bury deeper than the original soil level which was established in the nursery can. Avoid air pockets.
B. Apply post plant or surface application fertilizer at the rate of 5 lbs. per 1000 sq.ft. Water bed thoroughly after fertilizer application. Wash all fertilizer from leaves of plant materials.
3.11 BIOSWALE SOD
A. To be “Biofiltration Sod” as produced by Delta Bluegrass Company, or approved equal.
3.12 SOD BED PREPARATION
A. Roll amended soil with 200 lb. water ballast roller.
B. Sod immediately thereafter, provided the sod bed has remained in a friable condition.
3.13 SODDING OPERATIONS
A. Sod must be delivered to site within 24 hours of cutting. Lay sod so that adjacent strips butt tightly with no spaces between strips. Lay sod on slopes and mounds with strips parallel to contours. Stagger joints and do not overlap seams. Sodded areas shall be flush with adjoining seeded areas.
B. Tamp and roll sod thoroughly to make contact with sod bed.
C. Apply post planting fertilizer at a rate of 5 lbs. per 1000 s.f.
D. Water sod thoroughly.
E. No portion of the sod lawn will be allowed to dry out until the sod is well rooted.
F. Supplemental Temporary Irrigation: Contractor shall be responsible for temporary supplemental irrigation of all bio-retention areas through the sod establishment period. Method of irrigation application is discretionary and may include hand watering or installation of a temporary, above grade overhead spray circuit. Any replacement of sod necessary for loss or damage to sod due to lack of water shall be the responsibility of the contractor at contractor's expense.