City of Cotati
_______________________________________________________
PETALUMA BOULEVARD SOUTH PARK AND RIDE EXPANSION
Bidders:
Item
Number Item Description Quantity Unit of
Measurement
Price Per Unit Total Price Price Per Unit Total Price
1 Prepare Water Pollution
Control Program
1 LS $1,000.00 $1,000.00 $850.00 $850.00
2 Temporary Drainage Inlet
Protection
5 EA $200.00 $1,000.00 $225.00 $1,125.00
3 Temporary Gravel Bag Berm 100 LF $12.00 $1,200.00 $20.00 $2,000.00 4 Temporary Construction
Entrance
1 EA $2,500.00 $2,500.00 $13,000.00 $13,000.00
5 Temporary Fiber Roll (100%
Biodegradable) 45 LF $12.25 $551.25 $20.00 $900.00
6 Remove Rock Slope
Protection
50 CY $106.00 $5,300.00 $130.00 $6,500.00
7 Bicycle Locker (Bike Shell
Model 352 Locker) 1 EA $9,000.00 $9,000.00 $20,000.00 $20,000.00 8 Relocate Fence 375 LF $18.50 $6,937.50 $14.00 $5,250.00 9 Remove Concreet (Sidewalk
and Curb) 75 SQYD $40.00 $3,000.00 $140.00 $10,500.00
10 Adjust Utility Cover to
Grade
2 EA $2,200.00 $4,400.00 $1,400.00 $2,800.00
11 Clearing and Grubbing
(Demo) 1 LS $29,825.45 $29,825.45 $65,000.00 $65,000.00 12 Roadway Excavation 1,900 CY $88.00 $167,200.00 $52.00 $98,800.00 13 Structure Excavation
(Retaining Wall) 65 CY $56.00 $3,640.00 $400.00 $26,000.00 14 Subgrade Enhancement
Geotextile, Class B1 1,900 SQYD $3.25 $6,175.00 $8.00 $15,200.00 15 Class 2 Aggregate Base 620 CY $150.00 $93,000.00 $120.00 $74,400.00 16 Class 2 Aggregate Subbase 640 CY $85.00 $54,400.00 $115.00 $73,600.00 17 Hot Mix Asphalt (Type A) 300 TON $235.00 $70,500.00 $250.00 $75,000.00 18 Cold Plane Asphalt Concrete
Pavement (2" Grind)
195 SQYD
$35.00 $6,825.00 $80.00 $15,600.00
19 Structural Concrete,
Retaining Wall 70 CY $1,250.00 $87,500.00 $1,800.00 $126,000.00 20 Structural Concrete,
Drainage Inlet 3 CY $3,700.00 $11,100.00 $2,500.00 $7,500.00 21 Bar Reinforcing Steel
(Retaining Wall) 14,000 LB $1.75 $24,500.00 $4.00 $56,000.00 22 18" Reinforced Concrete
Pipe
240 LF $145.00 $34,800.00 $240.00 $57,600.00
23 36" Reinforced Concrete
Pipe
15 LF $1,025.00 $15,375.00 $450.00 $6,750.00
24 3" Slotted Plastic Pipe
Underdrain 200 LF $15.00 $3,000.00 $35.00 $7,000.00
25 Drainage Inlet Marker 4 EA $50.00 $200.00 $50.00 $200.00 26 18" Concrete Flared End
Section
2 EA $3,000.00 $6,000.00 $2,000.00 $4,000.00
27 Inlet Grate 4 EA $720.00 $2,880.00 $450.00 $1,800.00 28 48" Manhole Grate 1 EA $895.00 $895.00 $200.00 $200.00 Ghilotti Bros., Inc Argonaut Constructors
Bid Opening Date 6/29/2023
Engineer's Estimate: $3,433,464.00
City of Cotati
_______________________________________________________
PETALUMA BOULEVARD SOUTH PARK AND RIDE EXPANSION
Bidders:
Item
Number Item Description Quantity Unit of
Measurement
Price Per Unit Total Price Price Per Unit Total Price
Ghilotti Bros., Inc Argonaut Constructors
Bid Opening Date 6/29/2023
Engineer's Estimate: $3,433,464.00
29 48" Precast Concrete Pipe
Manhole 5 LF $2,250.00 $11,250.00 $1,000.00 $5,000.00
30 Remove Pipe 55 LF $37.00 $2,035.00 $40.00 $2,200.00
31 Modify Inlet to Manhole 2 EA $2,600.00 $5,200.00 $2,800.00 $5,600.00 32 Small-Rock Slope Protection 4 CY $1,000.00 $4,000.00 $500.00 $2,000.00 33 Minor Concrete Curb (Type
A1-6) 530 LF $54.00 $28,620.00 $75.00 $39,750.00
34 Detectable Warning Surface 18 SQFT $75.00 $1,350.00 $85.00 $1,530.00 35 Minor Concrete (Driveway) 8 CY $1,350.00 $10,800.00 $2,300.00 $18,400.00 36 Minor Concrete (Sidewalk) 12 CY $1,350.00 $16,200.00 $2,100.00 $25,200.00 37 Parking Bumper (Precast
Concrete) 17 EA $85.00 $1,445.00 $200.00 $3,400.00
38 Chain Link Fence (Type CL6) 650 LF $41.00 $26,650.00 $41.00 $26,650.00 39 Relocate Gate 1 EA $1,160.00 $1,160.00 $2,100.00 $2,100.00 40 Roadside Sign, One Post 19 EA $350.00 $6,650.00 $350.00 $6,650.00 41 Roadside Sign, Two Post 1 EA $2,000.00 $2,000.00 $2,000.00 $2,000.00 42 Painted Stall Lines and
Pavement Markings 875 SQFT $9.00 $7,875.00 $9.00 $7,875.00 43 Remove Thermoplastic
Traffic Stripe 585 LF $7.00 $4,095.00 $7.00 $4,095.00
44 Relocate Guy Wire/Poles 3 EA $2,500.00 $7,500.00 $2,500.00 $7,500.00 45 Shorten Guy Wire 2 EA $1,120.00 $2,240.00 $1,120.00 $2,240.00 46 Type III-AF Service
Equiptment Enclosure
1 EA $7,100.00 $7,100.00 $7,100.00 $7,100.00
47 Type A Electolier 7 EA $8,600.00 $60,200.00 $8,600.00 $60,200.00 48 Type B Elctorolier 3 EA $8,350.00 $25,050.00 $8,350.00 $25,050.00 49 #2 PG&E Pull Box 1 EA $450.00 $450.00 $450.00 $450.00 50 #3 1/2 Pull Box 15 EA $700.00 $10,500.00 $700.00 $10,500.00 51 #5 Pull Box 2 EA $850.00 $1,700.00 $850.00 $1,700.00 52 Remove Light on PG&E Pole 1 EA $500.00 $500.00 $500.00 $500.00 53 2" Conduit 990 LF $13.00 $12,870.00 $13.00 $12,870.00 54 3" Conduit 100 LF $22.55 $2,255.00 $22.55 $2,255.00
55 #2 Conductor 30 LF $23.00 $690.00 $23.00 $690.00
56 #8 Conductor 1,970 LF $1.75 $3,447.50 $1.75 $3,447.50 57 #14 Conductor 50 LF $1.50 $75.00 $1.50 $75.00
58 Trench & Backfill 1,060 LF $51.00 $54,060.00 $89.00 $94,340.00 59 Gravel Mulch 835 SQFT $3.30 $38,940.00 $2.00 $23,600.00 60 Edging 465 LF $14.50 $6,742.50 $4.00 $1,860.00
61 Rock Slope Protection
Fabric 25 SQYD $22.00 $550.00 $30.00 $750.00
62 Imported Soil (Bioretention
Swale) 57 CY $340.00 $19,380.00 $340.00 $19,380.00
63 Hydroseed 4,000 SQFT $1.00 $4,000.00 $3.50 $14,000.00 City of Cotati
_______________________________________________________
PETALUMA BOULEVARD SOUTH PARK AND RIDE EXPANSION
Bidders:
Item
Number Item Description Quantity Unit of
Measurement
Price Per Unit Total Price Price Per Unit Total Price
Ghilotti Bros., Inc Argonaut Constructors
Bid Opening Date 6/29/2023
Engineer's Estimate: $3,433,464.00
64 Plant Establishment Work 1 LS $27,000.00 $27,000.00 $25,000.00 $25,000.00 65 Planting and Mulch
(Bioretention) 1,550 SF $10.00 $15,500.00 $3.00 $4,650.00 66 Remove Headwall 1 EA $2,050.00 $2,050.00 $10,000.00 $10,000.00 67 Remove Concrete Storm
Drain Outfall
1 EA $2,050.00 $2,050.00 $1,000.00 $1,000.00
68 Filter Fabric (Class A Under
Gravel) 1,315 SQYD $3.00 $3,945.00 $1.00 $1,315.00
69 Filter Fabric at Retaining
Wall Backfill 75 SQYD $8.00 $600.00 $20.00 $1,500.00
70 Minor Concrete (Curb and
Gutter A2-6) 45 CY $1,100.00 $49,500.00 $1,000.00 $45,000.00 71 Pervious Backfill Material
(Retaining Wall) 45 CY
$220.00 $9,900.00 $225.00 $10,125.00
72 Bioretention Moisture
Barrier
70 SQYD $22.00 $1,540.00 $25.00 $1,750.00
73 Traffic Control System 1 LS $8,000.00 $8,000.00 $160,000.00 $160,000.00 74 Mobilization 1 LS $120,000.00 $120,000.00 $15,000.00 $150,000.00 $1,280,369.20 $1,624,872.50
75 Slurry Seal 1 EA $30,000.00 $30,000.00 $20,000.00 $20,000.00 $30,000.00 $20,000.00
Total Base Bid
Total Alternate Bid
Item
Number Item Description Quantity Unit of
Measurement
Price Per Unit Total Price Price Per Unit Total Price
1 Bicycle Locker (Bike Shell
Model 352 Locker) 1 EA $9,000.00 $9,000.00 $18,000.00 $18,000.00 2 Imported Biofiltration Soil 75 CY $625.00 $46,875.00 $300.00 $22,500.00 3 Prepare Water Pollution
Control Program
1 LS $1,000.00 $1,000.00 $850.00 $850.00
4 Temporary Drainage Inlet
Protection
1 EA $200.00 $200.00 $370.00 $370.00
5 Temporary Gravel Bag Berm 80 LF $13.00 $1,040.00 $30.00 $2,400.00 6 Temporary Construction
Entrance
1 EA $2,500.00 $2,500.00 $10,000.00 $10,000.00
7 Remove Inlet 1 EA $800.00 $800.00 $1,300.00 $1,300.00 8 Relocate Fence 350 LF $19.00 $6,650.00 $21.50 $7,525.00 9 Remove Concrete (Sidewalk
and Curb) 45 SQYD $60.00 $2,700.00 $125.00 $5,625.00
10 Remove Tree 18 EA $2,000.00 $36,000.00 $5,000.00 $90,000.00 11 Clearing and Grubbing
(Demo) 1 LS $30,000.00 $30,000.00 $70,000.00 $70,000.00 12 Roadway Excavation 2,670 CY $75.00 $200,250.00 $70.00 $186,900.00 13 Subgrade Enhancement
Geotextile, Class B1 3,750 SQYD $3.25 $12,187.50 $7.00 $26,250.00 14 Plant Establishment Work 1 LS $36,000.00 $36,000.00 $20,000.00 $20,000.00 15 Edging 50 LF $22.00 $1,100.00 $5.00 $250.00
16 Rolled Erosion Control
Product (Blanket) 2,200 SQFT $1.75 $3,885.00 $2.00 $4,440.00 17 Temporary Fiber Roll (100%
Biodegradable) 375 LF $7.00 $2,625.00 $8.00 $3,000.00
18 Hydroseed 2,220 SQFT $1.25 $2,775.00 $4.00 $8,880.00 19 Class 2 Aggregate Subbase 1,300 CY $80.00 $104,000.00 $100.00 $130,000.00 20 Class 2 Aggregate Subbase 1,070 CY $120.00 $128,400.00 $100.00 $107,000.00 21 Hot Mix Asphalt (Type A) 660 Ton $180.00 $118,800.00 $200.00 $132,000.00 22 Cold Plane Asphalt Concrete
Pavement (2" Grind) 170 SQYD
$40.00 $6,800.00 $80.00 $13,600.00
23 Structural Concrete,
Drainage Inlet 13 CY $4,200.00 $54,600.00 $2,000.00 $26,000.00 24 18" Reinforced Concrete
Pipe
261 LF $145.00 $37,845.00 $220.00 $57,420.00
25 Drainage Inlet Marker 3 EA $50.00 $150.00 $50.00 $150.00 26 48" Precast Concrete Pipe
Manhole 10 LF $2,300.00 $23,000.00 $600.00 $6,000.00
27 Remove Pipe 35 LF $36.00 $1,260.00 $50.00 $1,750.00
28 Adjust Utility Cover to
Grade
1 EA $1,400.00 $1,400.00 $2,500.00 $2,500.00
29 Small-Rock Slope Protection 5 CY $1,000.00 $5,000.00 $800.00 $4,000.00 30 Rock Slope Protection
Fabric 20 SQYD $15.00 $300.00 $25.00 $500.00
31 Minor Concrete Curb (Type
A1-6) 780 LF $52.00 $40,560.00 $70.00 $54,600.00
AIRPORT BOULEVARD PARK AND RIDE
Item
Number Item Description Quantity Unit of
Measurement
Price Per Unit Total Price Price Per Unit Total Price
AIRPORT BOULEVARD PARK AND RIDE
32 Detectable Warning Surface 65 SQFT $61.00 $3,965.00 $90.00 $5,850.00 33 Minor Concrete (Curb and
Gutter) 45 CY $1,050.00 $47,250.00 $1,400.00 $63,000.00 34 Minor Concrete (Curb,
Gutter, Sidewalk and
Driveway)
4 CY
$1,400.00 $5,600.00 $3,300.00 $13,200.00
35 Minor Concrete (Sidewalk) 15 CY $1,800.00 $27,000.00 $2,100.00 $31,500.00 36 Manhole Frame and Cover 2 EA $900.00 $1,800.00 $750.00 $1,500.00 37 Inlet Grate 2 EA $725.00 $1,450.00 $100.00 $200.00
38 Parking Bumper (Precast
Concrete) 5 EA $90.00 $450.00 $150.00 $750.00
39 Chain Link Fence (Type CL6) 410 LF $46.00 $18,860.00 $65.00 $26,650.00 40 Roadside Sign, One Post 7 EA $350.00 $2,450.00 $450.00 $3,150.00 41 Roadside Sign, Two Post 1 EA $2,000.00 $2,000.00 $200.00 $2,000.00 42 12" Thermoplastic Stripe 150 LF $15.00 $2,250.00 $15.00 $2,250.00 43 Painting Stall Lines and
Pavement Parkings 805 SQFT $9.00 $7,245.00 $9.00 $7,245.00 44 Modify (E) Service
Equiptment
1 EA $2,500.00 $2,500.00 $2,500.00 $2,500.00
45 Type A1 (Twin Head)
Electrolier
4 EA $10,950.00 $43,800.00 $10,950.00 $43,800.00
46 Type A (Single Head)
Electrolier 5 EA $8,600.00 $43,000.00 $8,600.00 $43,000.00 47 #3 Pull Box 9 EA $700.00 $6,300.00 $700.00 $6,300.00 48 #5 Pull Box 1 EA $850.00 $850.00 $850.00 $850.00
49 2" Conduit 710 LF $13.00 $9,230.00 $13.00 $9,230.00
50 #8 Conductor 1,420 LF $1.75 $2,485.00 $1.75 $2,485.00 51 Trench & Backfill 710 LF $51.00 $36,210.00 $98.00 $69,580.00 52 Gravel Mulch 1,820 SF $4.15 $7,553.00 $4.00 $7,280.00 53 Filter Fabric (Class A) Under
Gravel Mulch 205 SQYD $3.00 $615.00 $12.00 $2,460.00
54 Planting and Mulch
(Bioretention) 2,145 SF $10.00 $21,450.00 $10.00 $21,450.00 55 Bioretention Moisture
Barrier
100 SQYD $10.00 $1,000.00 $24.00 $2,400.00
56 Traffic Control System 1 LS $6,350.00 $6,350.00 $187,000.00 $187,000.00 57 Mobilization 1 LS $120,000.00 $120,000.00 $160,000.00 $160,000.00 $1,339,365.50 $1,729,440.00
$2,619,734.70 $3,354,312.50
Total Base Bid:
Grand Total Both Lots