Sonoma Water i Draft 2/29/2024
Water Transmission FY 2024/2025 Draft Budget and Rates
Infrastructure Investments
Sonoma Water’s critical infrastructure, including aqueducts, pipelines, pump stations, storage tanks, and wells, are gradually aging after decades of service. A significant portion of it is approaching the end of its useful lifespan. The age of the infrastructure, combined with substantial levels of deferred maintenance, underscores the importance of making investments to guarantee a dependable and sustainable water source for the future.

This budget is a crucial and essential step in that direction.

Sonoma Water has been successful in securing grants from various sources and has utilized fund balances and bond proceeds to help moderate rate increases. In fact, Sonoma Water’s wholesale rates (the rates that are charged to water contractors) are among the lowest in the greater Bay Area. Future proposed budgets will continue to prioritize ongoing infrastructure maintenance, replacement, and improvement to ensure a sustainable source of water for the benefit of the communities served.

The terms of the Restructured Agreement for Water Supply require that budgeted deliveries be the lesser of the preceding twelve months of water delivered, or the average annual amount of water delivered during the preceding 36 months. This requirement is to ensure Sonoma Water can meet its obligation to set rates at an amount that covers the projected costs for the following year. Sonoma Water must also generate sufficient revenue to cover debt obligations and maintain a debt coverage ratio as stipulated in outstanding bond issuances.

The Restructured Agreement for Water Supply also states that “If because of drought or other water-supply reduction, state or federal order, or other similar condition, the Agency anticipates that any such quantities will not be predictive of future usage, the Agency may use a different amount with the prior approval of the Water Advisory Committee.” For the FY 2024/2025 Water Transmission Budget, the prior 12 months of water deliveries (which is lower than the average of the last 36 months) is 40,844 acre-feet (AF). Due to the historic drought and mandated state conservation measures deliveries were historically low for the preceding 12-month period. All water contractors except Town of Windsor had deliveries below budget which contributed significantly to the lower deliveries figures. The spring 2023 landslide that curtailed use of the North Marin Aqueduct contributed a minor amount to the reduction in deliveries. Sonoma Water staff have analyzed supply/demand conditions and propose that budgeted deliveries for the FY 2024/2025 Water Transmission Budget be based on the 36-month average water deliveries of 42,826 AF. Budgeted deliveries of 42,826 AF represent a 2.3% increase compared to the FY 2023/2024 budget of 41,847 AF, while 40,844 AF for the preceding 12-month period would have resulted in a 2.4% decrease compared to prior year and put further pressure on rates. The FY 2024/2025 Water Transmission draft budget shown below has been developed based on the 36-month average water deliveries of 42,826 AF.

FY23-24 FY24-25
Budget
(in Millions)
Budget
(in
Millions)
Change
(in Millions)
Operations and Maintenance $40.41 $45.41 $5.00
Capital Projects $12.28 $15.66 $3.39
Biological Opinion Compliance, Water
Supply Planning, Water Conservation $9.78 $7.53 ($2.25) Debt Service $5.83 $5.83 $0.00
Totals $68.30 $74.43 $6.14
Grants, Use of Fund Balance, and Bond
Proceeds $18.15 $18.13 ($0.02)
Sonoma Water ii Draft 2/29/2024
Budget and Rate Reduction Measures: Changes made since January 17, 2024 Draft Water Transmission Budget:
• Decreased rate increase from 14.57% to 9.88% (Santa Rosa Aqueduct), 14.71% to 9.98% (Petaluma Aqueduct) and 12.06% to 8.14% (Sonoma Aqueduct).
• Reduced O&M contract services by an additional $2.45 million by deferring additional funds for the Tank Recoat Program. This reduction cuts the FY 2024/2025 rate increase by 4.7%. The consequences of reducing the tank recoat program budget are that for the subsequent two fiscal years (FY 2025/2026 and FY 2026/2027), there will be less of a buffer for cost overruns, less water sales revenue, reduced capacity to build fund balance to smooth rates, and on top of the rate increase needed to operate and maintain the water transmission system, there would be an additional 2.35% increase in rates each year just from the tank recoat program. The additional funding for the tank recoat program has been included in the budget to smooth rates over the 10-year tank recoat program. • Revised bond and loan charges: a) corrected/updated debt service figures; b) Storage Bond Charges are increasing because of the higher expenditures in the Storage Facilities Fund and the need for additional Storage Bond Funds; and c) Common Bond Charges decreased because funds were allocated to Storage Bonds for Storage Projects. Total Bond and Loan Charges have decreased compared to the current FY 2023/2024 budget because higher deliveries (36-month average water deliveries) are being used for the rate calculation.

FY 2024/2025 Draft Budget Financial Summary compared to FY 2023/2024 Adopted Budget: Factors affecting the rate increase:

The three years of historic drought and mandated conservation measures resulted in historically low FY 2022/2023 water deliveries of 36,032 AF, low water sales revenue, and significantly reduced fund balance reserves. Even with a 2.3% increase in budgeted deliveries of 42,826 AF, low reserves, and increasing operations and maintenance costs to keep pace with critically needed infrastructure improvements has contributed to needed rate increases. Significant efforts have been made to cut and defer maintenance projects to reduce the rate increase. Sonoma Water is not alone in facing rate pressures, as decreasing water sales are forcing other wholesalers and retailers to raise rates beyond historical averages.

Operations and Maintenance (O&M)
• 2.3% increase in budgeted deliveries.
• 12.3% increase in water sales revenue due to an increase in deliveries and the rate needed to cover budgeted expenditures.
• FY 2024/2025 budgeted expenditures: $45.41 million. An increase of $5.00 million or 12.4%. • Budgeted expenditures increase is mostly attributable to the tank maintenance program, tank recoat program, and cathodic protection, as well as, increased costs for equipment rentals and leases, chemicals, laboratory costs, and staff labor costs tied to negotiated labor agreements. • Must have sufficient net operating revenues to meet 1.15x debt coverage bond covenant requirement. • Water Sales Revenue Shortfall:
o FY 2021/2022: $1 million; FY2022/2023: $10.2M; FY 2023/2024: estimated $3 million to $4 million below budget. The estimated shortfall in FY23/24 is a result of our projection model predicting that deliveries will fall roughly 2.6% below budget compounded by fact that MMWD prepaid for some FY 2023/2024 deliveries under the Take or Pay provision in FY 2022/2023.

Sonoma Water iii Draft 2/29/2024
• FY 2022/2023 Actual Expenditures plus Encumbrances were $48.8 million compared to the Adjusted Budget of $47.5 million or 103% of the Adjusted Budget. FY 2023/2024 expenditures are anticipated to align closely with the adjusted budget with the exception of the cathodic protection project which is not sufficiently funded to award in the current fiscal year. Unspent budget is rolled forward to subsequent budget years to avoid being included in the rate calculation more than once. • Budgeted projects have been thoroughly reviewed and edited and represent the budgeted work that can reasonably occur in FY 2024/2025. Budgeted maintenance projects are a priority, and further delays and cuts pose detrimental operational impact or risk.
• O&M budget has been reduced by $3 million by deferring maintenance costs, and by reducing the Tank Recoat ask by $2.5 million for a total of $5.5 million in reductions. These deferrals could result in rate spikes in future years as the projects cannot be deferred indefinitely. • Deferring maintenance projects reduced the O&M rate increase from more than 31% to 12.41%.

Maintenance costs were deferred for the following projects:
• Tank Recoating Program
• Transmission System Condition Assessments
• SCADA
• Emergency Inventory Procurement
• Seismic Response Concept of Operations Planning
Capital Projects
Capital Projects: FY 2024/2025 draft budgeted expenditures of $15.66 million increased by $3.39 million or

27.61%.

Capital budget has been reduced by $2.9 million by deferring the Mirabel 12kV Resiliency and Warm Springs Dam Hydroturbine Retrofit projects.

Hazard mitigation projects ($8.4 million) and infrastructure improvement projects/drought resiliency projects ($7.2 million) are fully funded by Water Revenue Bonds, grants, and Fund Balance. $2.9 million in planned capital expenditures were deferred to ensure there would be no effect on the rate.

Investing in Infrastructure:

Construction: Hazard Mitigation Projects $7,228,402
Ely BPS Flood Control & Electrical Upgrade 318,000
RDS Pump and Motor Control Center Replacement 4,250,600 Seismic Retrofit of Storage Tanks 136,786
Wilfred Booster Station 2,523,016
Design: Hazard Mitigation Projects $1,232,600
Bennett Valley Fault Crossing 346,400
Collectors 3 and 5 Liquefaction Mitigation 886,200
Construction: Other Capital Projects $4,868,600
Mirabel Fiber Resiliency 2,987,000
Sonoma Water iv Draft 2/29/2024
Occidental Road Well 563,300
Ralphine Tanks Flow Thru Conversion 26,700
Sebastopol Road Well 639,400
Warm Springs Dam Hydroturbine Retrofit 652,200
Design Other Capital Projects $2,333,500
Kawana-Ralphine SBS Pipeline, Phase 1 908,400
Mirabel/Wohler Storage Building 354,900
Water System Treatment Upgrades 1,070,200
Biological Opinion
• 2.3% increase in deliveries.
• 17.56% increase in revenue due to an increase in deliveries and the rate. • Subfund budget has been reduced by $313,000 or a 31% decrease in expenditures due to reduced anticipated cost share related to Dry Creek and costs savings related to RRIFR Lagoon Outlet Channel Implementation and Algae/Water Quality Monitoring.
• $1.74 million in Use of Fund Balance reduces rate increase from 124.52% to 11.37%. • 11.37% rate increase compared to 9.94% increase in FY 2023/2024 when $3.5 million in Use of Fund Balance was budgeted.
• Expenditures will continue to range from $3 million to $4.5 million annually in this subfund. A rate of $40/AF at 42,826 AF generates $1.7 million in revenue. If more fund balance were used, there would be a significant rate spike in subsequent years to generate sufficient revenue for the subfund. The rate increase is intended to smooth future rate increases.

Dry Creek Habitat Enhancement Phase 4 construction activities are underway and will be complete in FY 2024/2025. Sonoma Water has pending expenditure credits under review by the U.S. Army Corp. The credits may offset a portion of Sonoma Water’s 35% cost share for Phases 4, 5, and 6 construction costs. The draft budget includes Dry Creek Habitat Enhancement design and right-of-way for phase 6, and construction for phases 4, and 5, as well as other required biological opinion activities.

Among other ongoing biological opinion activities, Sonoma Water staff submitted a Biological Assessment to NMFS and CDFW on August 23, 2023 as a precursor to the issuance of a new Biological Opinion.

Water Conservation
• 2.3% increase in deliveries.
• 12.4% decrease in revenue due to a reduction in the rate increase. • 15.6% decrease in expenditures to reduce the rate increase due to cuts to the QWEL program, spatial analysis, public outreach, and education efforts.
• Subfund budget has been reduced by $145,000 by deferring costs. • $250,000 in Use of Fund Balance. Reduces rate increase from 20.90% to 10.11%. o FY 2023/2024 Adopted Budget used $418,000 in Fund Balance to reduce the Water Conservation Rate Increase to 13.85%.
o Without the Use of Fund Balance in the FY 2023/2024 Adopted budget, the Water Conservation rate increase would have been 34.88%.
o Due to historic low deliveries in FY 2022/2023, there is limited capacity to use Fund Balance in the FY 2024/2025 Adopted Budget.
• 10.11% rate increase compared to 13.85% increase in FY 2023/2024 when $418,000 in Use of Fund Balance was budgeted.

Sonoma Water v Draft 2/29/2024
Sonoma Water and the Sonoma Marin Saving Water Partnership plan to continue work on conservation related initiatives and corresponding outreach and education activities.

There was an expansion of programs (at the direction of the Water Contractors) to respond to the historical drought conditions after rates were set in FY 2021/2022 and FY 2022/2023. The costs of these programs were not captured in the previous years’ rates and the expenses were therefore paid for by fund balance.

Furthermore, historically low deliveries in FY 2022/2023 resulted in revenue shortfalls further depleting fund balance.

This year the Water Conservation Subfund budget is only inclusive of what is needed to maintain existing successful regional programs of the Partnership, including the Water Education Program, Green Business Program, Garden Sense Program, Water Loss Working Group and Validation Services, QWEL Program, DIY Toolkit, Eco-Friendly Garden Tour, WaterSmart Plant Label Program. The budget also includes funds for continued administration and coordination of USBR WEEG grant award and the Prop 1 Bay Area and North Coast grant awards for the Partnership.

Water Management and Recycled Water and Local Supply
For both of these subfunds, low budgeted expenditures, low rates, and use of fund balance have minimal impact (less than 0.03%) on the overall rate increase.

Water Management rate is increasing for budget needed for the upcoming Urban Water Management Plan (UWMP). The slight increase in the rate is to smooth the rate increases over multiple years as previously agreed upon with the water contractors.

Recycled Water and Local Supply costs are for Sonoma Water’s share of the groundwater sustainability agency costs. The rate is set to $0/AF since there is sufficient fund balance to cover these costs and there are no other anticipated expenditures in the next couple of years.

Debt Service
Debt Service Expenditures remain the same as last year.

Summary
The draft proposed budget for FY 2024/2025 is based on accomplishing the required elements of the Biological Opinion, maintenance of facilities, continued implementation of hazard mitigation and reliability projects, and projects responsive to the conditions of critical infrastructure.

Sonoma Water recognizes the profound impact of natural hazards, the remnants of the COVID-19 pandemic, and current economic circumstances to many residents, businesses, and our retail water contractors throughout our county and beyond. In response to the far-reaching financial hardships, Sonoma Water made a conscious effort to reduce rate increases while continuing to maintain system reliability and public health and safety. Sonoma Water was able to keep average rate increases at 6.0% and 5.2% over the past five and ten years respectively, even with the 10.56% rate increase in FY 2023/2024.

Due to the age of our critical infrastructure, rising costs, the backlog of repeatedly deferred maintenance, and continued low deliveries, our previous goal of 4-6% is no longer adequate. The Long Range Financial Plan is projecting future higher rate increases.

Sonoma Water’s rate is fully volumetric meaning that lower deliveries drive rates higher. Budgeted deliveries averaged over the 3- and 10-year periods and actual deliveries averaged over the past 3, 5, and 10-year periods have been negative, which has put continuous pressure on rates.

Sonoma Water vi Draft 2/29/2024
Budgeted Deliveries Actual Deliveries
3-year
average
5-year
average
10-year
average
3-year
average
5-year
average
10-year
average
-1.27% 0.17% -1.14% -6.62% -0.49% -2.13%
Sources of revenue include water sales and charges for services, federal and state grants, existing fund balances, contributions, interest, and bond financing.

Revenues
FY 2024/2025
Draft Budget
Increase/(Decrease)
over FY 2023/2024
Water Sales & Charges for Services 56,410,448 12%
Operating Grants 1,036,360 (44%)
Capital Grants 0 (100%)
Contributions 301,055 (1%)
Interest & Investment Earnings 1,100,172 9%
TOTAL 58,848,035 7.9%
Fund Balance FY 2024/2025 Draft
Budget
Increase/(Decrease)
over FY 2023/2024
Use of Fund Balance: 11% from
Operating Funds; 89% from
Capital Funds 10,635,639 (13%)
Bond Funds FY 2024/2025 Draft
Budget
Increase/(Decrease)
over FY 2023/2024
Use of Bond Funds 6,460,000 126%
Budget Requirements:
• Maintain 3-month operating reserve.
• Maintain 1.15x debt coverage bond covenant.
• Rates collect 1.15x debt service in accordance with the provisions of the Water Transmission System Master Ordinance.

Budget and Rate Reduction Measures reflected in the February 20 draft budget:
• Decreased rate increase from 26% to 9.88% by deferring a total of $8.9 million in projects: $5.5 million in operations and maintenance projects, $2.9 million in capital projects, and $500 thousand in Subfund projects. Sonoma Water has been deferring millions of dollars of capital and maintenance projects annually to reduce rate increases.
• Total expenditures budget is 8.99% higher than FY 2023/2024. • Capital Program is fully funded by the $15 million in 2022 Revenue Bonds, grants, and fund balance. No contribution from Water Transmission O&M Fund.
• The FY 2023/2024 Santa Rosa Aqueduct Discretionary Capital Charge of $11/AF is included in this draft budget resulting in a total rate increase of 9.88%. This charge contributes approximately 0.8% to the overall rate increase. The FY 2023/2024 Petaluma Aqueduct Discretionary Capital Charge of $0/AF is included in this draft budget resulting in a total rate increase of 9.98%. The FY 2023/2024 Sonoma Sonoma Water vii Draft 2/29/2024
Aqueduct Discretionary Capital Charge of $34.90/AF is included in this draft budget resulting in a total rate increase of 8.14%. This charge contributes approximately 2.6% to the overall rate increase. • Use of $18.13 million in grants, fund balance, and bond proceeds reduces the rate increase from 50.7% to 9.88%.
o Use of Fund Balance: $10.64 million.
o Grant revenue: $1.04 million
o Bond proceeds: $6.46 million
• $2.25 million of Prudent reserve is being utilized to ensure we meet our O&M Reserve requirement of 3 months of operating costs.
• Water Transmission System Total Cost per Gallon is $0.004.

Factors affecting the Rate Increase:
• 2.3% increase in deliveries
• Two years with actual water deliveries 4% and 21.2% less than budget and a third year estimated at 2.4% less than budget.
• 12.5% increase in total revenue.
• 12.4%. increase in O&M costs.
• 96.7% of the rate increase is attributable to the O&M budget, -5.2% to debt service, and 8.5% to the subfunds (Water Management, Watershed Planning and Restoration, Recycled Water and Local Supply, and Water Conservation).
• The net effect of the Water Conservation Rate Increase on the Total Water Transmission Rate Increase is

0.46%.
• MMWD is receiving 474 AF of water paid for in FY 2022/2023 under their take or pay provision in FY 2023/2024. This results in less revenue than budgeted in FY 2023/2024 and lower Fund Balance. • Increases in material and equipment costs for aging infrastructure and priority maintenance projects that can no longer be deferred, continued supply chain disruptions, long lead times on equipment, and the current inflationary environment are putting upward pressure on the Water Transmission System budget.
* Increase in actual deliveries in FY20-21 was partially due to the backfilling of Stafford Lake by NMWD. In FY21-22, MMWD took excess winter instream flows.

Sonoma Water viii Draft 2/29/2024
Sonoma Water continues to have one of the lowest wholesale water rates in the San Francisco Bay Area. The chart below compares the proposed FY24/25 rate per AF to the current rates of other wholesale water agencies in the bay area.

Sonoma Water ix Draft 2/29/2024
Proposed rates are shown in the table below:

Charge / Aqueduct Santa Rosa Petaluma Sonoma
Deliveries (Acre-Feet) 42,826
O&M $1015.39 $1015.39 $1015.39
Water Management Planning $0.35 $0.35 $0.35
Watershed Planning & Restoration $40.04 $40.04 $40.04
Recycled Water and Local Supply $0.00 $0.00 $0.00
Water Conservation $59.55 $59.55 $59.55
Total O&M $1,115.33 $1,115.33 $1,115.33
Storage & Common Bond/Loan Charges $162.69 $162.69 $162.69 Sonoma Aqueduct Bond/Loan Charge $145.49
Prime Contractors $1,278.02 $1,278.02 $1,423.51
Discretionary Charges
Capital Charges - to build fund balance for
future projects $11.00 $0.00 $34.90
Total Prime Contractors $1,289.02 $1,278.02 $1,458.41
Total Overall Increase: 9.88% 9.98% 8.14%
Entity Rate per AF Rate Increase
Town of Windsor $1,289.02 9.88%
Town of Windsor (Diverted Water) $99.94 11.00%
NMWD 1,385.15 11.74%
MMWD $1,610.09 10.64%
• Deliveries: (Budget Packet Pages 9-14):

FY 2021/2022
Budget
FY 2021/2022
Actuals
FY 2022/2023
Budget
FY 2022/2023
Actuals
FY 2023/2024
Budget
FY 2023/2024
Estimated
Actuals
FY 2024/2025
Estimated
Budget
3-year Average 3-year average 12-months 3-year average
46,095.00 44,236.90 45,748.00 36,031.60 41,847.20 40,845.00 42,826 4% less than
budget

21.2% less than
budget

2.4% less than
budget
FY23-24 vs
FY24-25 Budget
Variance (1,858.10) (9,716.40) (1,002.20) 1,981
FY 2023/2024 Budgeted Deliveries vs FY
2024/2025 Budgeted Deliveries

2.3% increase
FY 2022/2023 Actuals vs FY 2023/2024 Estimated
Actuals

13.1% increase
Sonoma Water x Draft 2/29/2024
• Operations and Maintenance (O&M) – Water Transmission O&M Fund (Budget Packet Pages 15-25):
o In accordance with the Restructured Agreement for Water Supply:
 The rate is calculated by dividing operations and maintenance expenditures (less specific cash and noncash revenues and expenditures) by budgeted deliveries.

O&M Fund
Increase
(Decrease)
in Dollars
Percent
Change Description
Rate per AF $112.09 12.41% Increase is attributable to increased infrastructure maintenance needs coupled with elevated material and labor costs.

Revenue $6,194,000 12.29% Increase in revenue is attributable to the rate increase.

Expenditures $5,019,000 8.58%
Increase is attributable to an increase in maintenance projects (cathodic protection, tank recoats, tank maintenance,
pump/meter/valve replacements, collector maintenance, SCADA upgrades), studies (arc flash studies, hydrogeologic investigations, Regional Water Supply Resiliency, Seismic Mitigation Studies, Water System Comprehensive Master Plan, Wohler and Mirabel Collector Variable Frequency Drive (VFD) Study, and emergency inventory procurement, and other expenditures increases described below.

Factors affecting the O&M rate:

O&M Fund
Expenditures
Increase
(Decrease)
in Dollars
Percent
Change Description
Labor $1,830,000 9.96%
Increase is attributable to an increase in labor costs for maintenance projects (cathodic protection, tank recoats, tank maintenance, pump/meter/valve replacements, collector
maintenance, SCADA upgrades), studies (arc flash studies, hydrogeologic investigations, Regional Water Supply Resiliency, Seismic Mitigation Studies, Water System Comprehensive Master Plan, Wohler and Mirabel Collector Variable Frequency Drive (VFD) Study, emergency inventory procurement, and mitigation monitoring for recently completed FEMA projects, offset by projects deferred to reduce the rate increase. Approximately, 5% of this increase is due to negotiated labor rates.

Power $0 0.00% Power demand and costs are expected to align with the FY 2023/2024 budget.

Chemicals $425,000 54.84%
Increase due to elevated chlorine and caustic soda costs. Input costs grew by 71% in FY 2022/2023 and are on track to increase further in FY 2024/2025.

Testing/Analysis $40,000 20.00%
Increase associated with expanded sampling and analysis tied to the Santa Rosa Plain Wells Projects as well as additional microplastics and Perfluoroalkyl/Polyfluoroalkyl Substances (PFAS) testing.

Contract Services $981,000 8.88%
Increase attributable to increased maintenance project costs related to collector maintenance, cathodic protection, tank recoats, tank maintenance, arc flash studies, hydrogeologic investigations, and water system comprehensive master planning, offset by $4.42M in projects that have been deferred to reduce the rate increase.

Sonoma Water xi Draft 2/29/2024
O&M Fund
Expenditures
Increase
(Decrease)
in Dollars
Percent
Change Description
Maintenance -
Equipment ($380,000) -13.22% Decrease attributable to lower budgeted expenses and $260,000 in projects that have been deferred to reduce the rate increase.

Rents and Leases
- Heavy Eqt $200,000 100.00% Increase attributable to elevated equipment needs to implement current suite of maintenance projects.

Equipment
Usage Charges $200,000 22.22% Increase attributable to increased use of Sonoma Water equipment to implement routine maintenance projects.

SCADA $2,191,000 N/A Increase attributable to Water Transmission System’s share of SCADA capital projects.

Operating
Transfers $503,000 8.00%
Operating Transfers (OT’s) move revenue generated by rates into respective funds (debt service funds, subfunds, aqueduct capital funds and Common Facilities) and maintain appropriate fund balance.
• Subfunds: (Budget Packet Pages 26-35):
o Subfund rates are calculated by dividing subfund expenditures minus grant revenue by budgeted water deliveries.
o Water Management Planning:
 Expenditures are for Urban Water Management Planning (UWMP) which is required to be updated every five years and the Annual Water Supply & Demand Assessment.

Water
Management
Planning
Increase
(Decrease)
in Dollars
Percent
Change Description
Rate per AF $0.35
NA – last
FY rate was
$0.

Fiscal Year 2023/2024 rate is $0.00. Fund is for Urban Water Management Plan updates and the Annual Water Supply &
Demand Assessment. Rate of $3.39/AF based on $145,000 in expenditures and 42,826 AF is reduced to $0.35/AF by using $130,000 in fund balance. Rate increase is in anticipation of work needed to submit the 2025 Urban Water Management Plan.

Revenue $18,000 333.4%
Increase due to subfund rate increase and higher interest earnings offset by use of fund balance. Decreasing use of fund balance to smooth rate increases.

Expenditures $45,000 45.0%
Budget increase is due to staff time related to the annual water supply and demand assessment. Budget request is for follow-up meetings, responding to State Department of Water Resources and contractor requests, tracking regulatory compliance changes, and coordinating with climate adaption strategic planning efforts.

Sonoma Water xii Draft 2/29/2024
o Watershed Planning and Restoration:
 Expenditures are for planning, design, and implementation of watershed restoration projects and projects required under the Biological Opinion.

Watershed
Planning and
Restoration
Increase
(Decrease) in
Dollars
Percent
Change Description
Rate per AF $4.09 11.4%
Fiscal Year 2023/2024 rate is $35.96. Rate increase is primarily a result of not being able to utilize as much fund balance to offset rate as was used in prior year. Rate of $80.73/AF based on $3.5M in expenditures and 42,826 AF is reduced to $40.04/AF by using $1.7M in fund balance. In Fiscal Year 2023/2024 $3.5M in fund balance was utilized to offset rate increases.

Revenue $295,000 17.6%
Increase due to subfund rate increase and higher interest earnings offset by use of fund balance to reduce and smooth overall rate increase.

Expenditures ($1,547,000) -30.9%
Decrease in expenditures is a result of reduced budgeted cost share due to U.S. Army Corps credits for Sonoma Water’s share of costs for construction of Dry Creek Habitat Enhancement phases 4, 5, and 6, and reduced efforts for RRIFR Lagoon Outlet Channel Implementation and Algae/Water Quality Monitoring.

Budget includes ongoing costs for Dry Creek Habitat
Enhancement Phases 4, 5, 6, and other required biological opinion activities.

Sonoma Water xiii Draft 2/29/2024
o Recycled Water and Local Supply:
 Expenditures are for planning, design, and implementation of recycled water and local supply projects. The fund previously included water contractor projects under the Local Recycled Water Tier 2 (LRT2) Program.

Recycled Water
and Local Supply
Increase
(Decrease)
in Dollars
Percent
Change Description
Rate per AF $0.00
NA – last
FY rate was
$0.

Fiscal Year 2023/2024 rate is $0.00. Due to accumulated fund balance rate remains at $0 in FY24/25.

Revenue $2,000 33.2%
Using an estimated $31,000 in fund balance to keep rate at $0.

Increase in revenue is associated with higher anticipated interest earnings.

Expenditures ($25,000) -44.6%
Decrease is due to lower anticipated expenditures. Expenditures are for Sonoma Water's share of Groundwater Sustainability Agencies' budgets.

Water Conservation:
 Expenditures are for water use efficiency projects, outreach, and education.

Water
Conservation
Increase
(Decrease)
in Dollars
Percent
Change Description
Rate per AF $5.47 10.1%
Fiscal Year 2023/2024 rate is $54.08. Rate increase is primarily a result of not being able to utilize as much fund balance to offset rate as was used in prior year. Rate of $65.38/AF based on $2.8M of net expenditures and 42,826 AF is reduced to $59.55/AF by using $250,000 in fund balance. In Fiscal Year 2023/2024 $418,000 in fund balance was utilized to offset rate increase.

Revenue ($540,000) -12.4% Decrease due to subfund rate increase and higher interest earnings offset by lower anticipated grant funding than prior year budget.

Expenditures ($721,000) -15.6%
Decrease is associated with decreased planned expenditures due to lack of a new grant funded project. Expenditures used to implement water use efficiency, outreach and education projects, address ongoing water conservation needs, and pass-through grant funds to water contractors and other partners.

Sonoma Water xiv Draft 2/29/2024
• Storage, Common, and Sonoma Bond/Loan Charges: (Budget Packet Pages 46-57):
o The rates are calculated by dividing the annual debt service and reserve requirements (2015A, 2019A, and 2022A Water Revenue Bonds) by water deliveries.

Storage and
Common
Bond/Loan
Charges
Increase
(Decrease)
in Dollars
Percent
Change Description
Storage
Bond/Loan
Charge
$2.32 8.0%
Fiscal Year 2023/2024 rate is $33.38. Rate is based on revenue requirement for debt service divided by water deliveries. Total Debt service higher than previous year due to reallocation of 2022 bond proceeds to fund capital projects in the Storage Fund. Rate increase is due to additional project funding needs offset by increase in budgeted water deliveries.

Common
Bond/Loan
Charge
($8.39) -6.0%
Fiscal Year 2023/2024 rate is $127.89. Rate is based on revenue requirement for debt service divided by water deliveries. Total Debt service lower than previous year due to reallocation of 2022 bond proceeds to fund capital projects in the Storage Fund. Rate decrease is due to decrease in bond proceeds needed for capital projects in the fund and an increase in budgeted water deliveries.

Sonoma
Aqueduct
Bond/Loan
Charge
($6.19) -4.1%
Fiscal Year 2023/2024 rate is $143.41. Sonoma Aqueduct pays an additional revenue bond charge for the bonds associated with Sonoma Booster Station Electrical Upgrade and Pumping Reliability Project, Bennett Valley Fault Crossing Project, and other Creek Crossing Projects on the Aqueduct. Total Debt service lower than previous year due to savings associated with refunding in the 2022 Revenue Bond Issuance. Rate decrease is due to increase in budgeted water deliveries.

Aqueduct Capital Charge: (Budget Packet Page 1):
o A discretionary charge is added by the water contractors to build fund balance for future aqueduct capital projects and to provide rate stabilization capacity. o The FY 2023-2024 budget included an $11 per Acre-Foot charge for the Santa Rosa Aqueduct, a $0 per Acre-Foot charge for the Petaluma Aqueduct, and a $34.90 per Acre-Foot charge for the Sonoma Aqueduct.
o The FY 2024-2025 draft budget includes a $11 per Acre-Foot charge for the Santa Rosa Aqueduct, a $0 per Acre-Foot charge for the Petaluma Aqueduct, and a $34.90 per Acre-Foot charge for the Sonoma Aqueduct.
• Overall Draft Proposed Rate Increases: (Budget Packet Pages 1-8):
o 9.88% (Santa Rosa Aqueduct); 9.98% (Petaluma Aqueduct); 8.14% (Sonoma Aqueduct) o FY2024/2025 budgeted deliveries are based on 36-month average water deliveries (42,826AF) instead of the 12-month water deliveries (40,844AF). FY2024/2025 budgeted deliveries are 2.3% more than FY 2023/2024 budgeted deliveries.
o The FY2024/2025 budget accommodates an increase in maintenance projects (cathodic protection, tank recoats, tank maintenance, pump/meter/valve replacements, collector maintenance, SCADA upgrades), studies (arc flash studies, hydrogeologic investigations, Regional Water Supply Resiliency, Seismic Mitigation Studies, Water System Comprehensive Master Plan, Wohler and Mirabel Collector Variable Frequency Drive (VFD) Study, emergency inventory purchases, Water Conservation, Biological Opinion and Dry Creek Habitat Enhancement design and right-of-way for phase 6, and construction for phases 4, and 5, and investment in hazard mitigation and other capital infrastructure projects, all in an environment of increasing input costs.

Sonoma Water xv Draft 2/29/2024
FY 2024-2025 Capital Projects (Budget Packet Pages 36-45):

Water Transmission Budget FY24-25
Capital Projects Summary
Project Category Amount Status
Ely BPS Flood Control & Electrical Upgrade Petaluma AQ 318,000 Award Q3 FY21/22; Delayed due to Elec Supply Chain issues; Construction FY24/25 - FY25/26 Wilfred Booster Station Petaluma AQ 2,523,016 90% design; Prepurchase Elec Equipt Q4 FY23/24; Anticipate Constuction Award Q4 FY24/25 Bennett Valley Fault Crossing Sonoma AQ 173,200 30% design complete. Engaging consultant for final design FY23/24. Anticipate award in FY25/26 Kawana-Ralphine SBS Pipeline Storage 908,400 Consultant Selection 24/25; Anticpate construction award in FY25/26 Bennett Valley Fault Crossing Storage 173,200 30% design complete. Engaging consultant for final design FY23/24. Anticipate award in FY25/26 Seismic Retrofit of Storage Tanks Storage 136,786 Preliminary design; Tied to Tank Recoat schedule Ralphine Tanks Flow Thru Conversion Storage 26,700 Engaging consultant for design FY23/24; Anticipate construction award in FY24/25 Collectors 3 and 5 Liquefaction Mitigation Common 886,200 Preliminary Design; Anticpate award in FY26/27 Mirabel 12kV Resiliency Common - Design Phase in FY25/26; Anticipate award in FY27/28 Mirabel/Wohler Storage Building Common 354,900 Design Advancing; Anticipate award FY25/26 Mirabel Fiber Resiliency Common 2,987,000 Design Phase; Anticipate award in FY24/25 RDS Pump and Motor Control Center Replacement Common 4,250,600 Design Advancing; Anticipate award in FY24/25 Occidental Road Well Common 563,300 Construction initiated FY23/24; Anticipate construction complete in FY24/25 Sebastopol Road Well Common 639,400 Construction initiated FY22/23; Anticipate construction complete in FY24/25 Warm Springs Dam Hydroturbine Retrofit Common 652,200 Re-issuing equipt. RFP. Switchgear purchase in FY23/24. Anticipate award in FY24/25 Water System Treatment Upgrades Common 1,070,200 Preliminary design underway; Engage consultant for final design FY 24/25 TOTAL 15,663,102
Santa Rosa AQ -
Petaluma AQ 2,841,016
Sonoma AQ 173,200
Storage 1,245,086
Common 11,403,800
15,663,102
Sonoma County Water Agency
Fiscal Year 2024/2025 Draft Water Transmission Budget and Rates Budget Packet Page
Rates
Prime Contractor Rates Summary 1-2
Water Charges Per Acre-Foot 3
Revenue Summary 4
Water Rates 5
O&M Rate 6
Line Item Rate Comparison 7
Russian River Projects and Conservation Charges 8
Deliveries
Deliveries (36 Mo) 9
Deliveries (12 Mo) 10
Deliveries and Revenue - All Aqueducts 11
Deliveries and Revenue - Santa Rosa Aqueduct 12
Deliveries and Revenue - Petaluma Aqueduct 13
Deliveries and Revenue - Sonoma Aqueduct 14
Agency O&M Fund
Agency Fund Cash Summary 15-18
Major Services and Supplies Expenditure Items 19
Equipment Maintenance, Contracts, Consulting Services 20-21 Contract Services & Contributions Project Information 22-25 Subfunds
Water Management Subfund 26
Watershed Planning and Restoration Subfund 27-28
Recycled Water and Local Supply Subfund 29-30
Water Conservation Subfund 31-32
Subfund Contract Services 33-35
Facilities and Other Funds
Santa Rosa Aqueduct Capital Fund 36-37
Petaluma Aqueduct Capital Fund 38-39
Sonoma Aqueduct Capital Fund 40
Storage Facilities Cash Summary 41-42
Common Facilities Cash Summary 43-44
North Marin Water Deposit Fund 45
Bonds and Loans
State Revolving Loan Debt Service Fund 46
State Revolving Loan Reserve Fund 47
Storage Bonds 2015 Cash Summary 48
Common Bonds 2015 Cash Summary 49
Sonoma Bonds 2015 Cash Summary 50
Common Bonds 2019 Cash Summary 51
Sonoma Bonds 2019 Cash Summary 52
Storage Bonds 2022 Cash Summary 53
Common Bonds 2022 Cash Summary 54
Sonoma Bonds 2022 Cash Summary 55
Bond & Loan Charges 56-57
Fund Balances and Operating Transfers 58
DRAFT
Fiscal Year 2024/2025 Prime Contractor Rates Summary
Santa Rosa Petaluma Sonoma
Aqueduct Aqueduct Aqueduct FY23-24
Percent
Change
SR Pet Son
O&M Charge [4.2] 1,015.39 1,015.39 1,015.39 $903.30 $903.30 $903.30 12.41% Water Management Planning Sub-charge [4.13] 0.35 0.35 0.35 $0.00 $0.00 $0.00 N/A Watershed Planning/Restoration Sub-charge [4.14] 40.04 40.04 40.04 $35.96 $35.96 $35.96 11.37% Recycled Water & Local Supply Sub-charge [4.15] 0.00 0.00 0.00 $0.00 $0.00 $0.00 N/A Water Conservation Sub-charge [4.16] 59.55 59.55 59.55 $54.08 $54.08 $54.08 10.11% O&M Charge 1,115.33 1,115.33 1,115.33 $993.34 $993.34 $993.34 12.28% Storage and Common Bond & Loan Charges 162.69 162.69 162.69 $168.75 $168.75 $168.75 -3.59% Sonoma Aqueduct Bond Charge 145.49 $151.68 -4.1%
PRIME CONTRACTORS $1,278.02 $1,278.02 $1,423.51 $1,162.09 $1,162.09 $1,313.77 9.98% Capital Charges - to build fund balance
for future projects 11.00 0.00 34.90 $11.00 $0.00 $34.90 0% PRIME CONTRACTORS 11.00 0.00 34.90 $11.00 $0.00 $34.90 0% TOTAL PRIME CONTRACTORS $1,289.02 $1,278.02 $1,458.41 $1,173.09 $1,162.09 $1,348.67 9.88% Increase from Fiscal Year 2023/2024 9.88% 9.98% 8.14% 21.32% 20.18% 21.81% With No Capital Charge 8.94% 9.98% 5.55%
Deliveries:
12-month 36-month
FY14-15 46,000
FY15-16 50,590
FY16-17 40,524
FY17-18 41,446
FY18-19 41,768
FY19-20 43,870
FY20-21 43,707
FY21-22 46,095
FY22-23 45,748
FY23-24 41,847
FY24-25 42,826
CHARGE PER ACRE FOOT:
2/29/2024
DRAFT 1
Fiscal Year 2024/2025 Prime Contractor Rates Summary
CHARGE PER ACRE FOOT:

Petaluma AQ

NMWD NMWD
Percent
Change
FY24-25 FY23-24
O&M Charge [4.2] 1,015.39 $903.30 12.41%
Water Management Planning Sub-charge [4.13] 0.35 $0.00 N/A Watershed Planning/Restoration Sub-charge [4.14] 40.04 $35.96 11.37% Recycled Water & Local Supply Sub-charge [4.15] 0.00 $0.00 N/A Water Conservation Sub-charge [4.16] 59.55 $54.08 10.11% O&M Charge 1,115.33 $993.34 12.28%
North Marin Bond & Loan Charge [4.9] 90.54 $93.16 -2.81% Russian River Conservation Charge [4.18 (a)] 159.28 $137.33 15.98% Russian River Projects Charge [4.18 (b)] 20.00 $15.79 26.69% TOTAL NMWD $1,385.15 $1,239.61 11.74%
Rates Rate Increase
Town of Windsor $1,289.02 9.88%
Town of Windsor (Diverted Water) $99.94 11.00%
NMWD 1,385.15 11.74%
MMWD $1,610.09 10.64%
2/29/2024
DRAFT 2
SANTA
ROSA

AQUEDUCT
% INCR.
(DECR.)

PETALUMA

AQUEDUCT
% INCR.
(DECR.)
SONOMA

AQUEDUCT
% INCR.
(DECR.)
2024 - 2025 1289.02 9.88% 1278.02 9.98% 1458.41 8.14%
2023 - 2024 1173.09 10.56% 1162.09 9.42% 1348.67 10.56% 2022 - 2023 1061.04 6.05% 1062.04 6.15% 1219.90 6.52%
2021 - 2022 1000.46 3.47% 1000.46 3.47% 1145.18 3.43%
2020 - 2021 966.95 5.30% 966.95 5.30% 1107.21 5.57%
2019 - 2020 918.30 4.60% 918.30 4.60% 1048.80 4.77%
2018 - 2019 877.88 3.67% 877.88 3.67% 1001.06 5.98%
2017 - 2018 846.78 4.98% 846.78 4.98% 944.56 5.58%
2016 - 2017 806.59 5.98% 806.59 5.98% 894.62 6.94%
2015 - 2016 761.05 4.16% 761.05 4.16% 836.55 5.46%
2014 - 2015 730.68 3.60% 730.68 3.60% 793.24 3.19%
2013 - 2014 705.30 4.95% 705.30 4.95% 768.75 3.84%
2012 - 2013 672.03 5.98% 672.03 5.98% 740.34 5.26%
2011 - 2012 634.11 5.00% 634.11 5.00% 703.33 4.28%
2010 - 2011 603.92 6.93% 603.92 6.93% 674.47 8.42%
2009 - 2010 564.78 19.88% 564.78 10.50% 622.11 27.95%
2008 - 2009 471.13 6.66% 511.13 10.71% 486.22 7.22%
2007 - 2008 441.70 2.41% 461.70 2.31% 453.49 2.46%
2006 - 2007 431.29 4.51% 451.29 4.30% 442.60 4.26%
2005 - 2006 412.68 2.53% 432.68 2.41% 424.53 2.44%
2004 - 2005 402.51 2.19% 422.51 2.08% 414.42 1.59%

WATER TRANSMISSION SYSTEM
FY24-25 WATER CHARGES PER ACRE-FOOT

FOR PRIME CONTRACTORS
FISCAL
YEAR
DRAFT
A-2 2/29/2024
3 FY24-25 FY23-24 FY24-25
WATER CUSTOMER Budgeted Water
Use (Acre-Feet)
Rate
$/Acre-Foot
Proposed Rate
$/Acre-Foot Dollar Change Percent Change
Santa Rosa Aqueduct 15,554 $1,173.09 $1,289.02 $115.93 9.88% Petaluma Aqueduct 8,726 1,162.09 1,278.02 $115.93 9.98% Sonoma Aqueduct 3,521 1,348.67 1,458.41 $109.74 8.14%
North Marin Water District 5,436 1,239.61 1,385.15 $145.54 11.74% Marin Municipal – Fourth
Off Peak 4,300 1,455.24 1,610.09 $154.85 10.64%
Marin Municipal –
Supplemental 3,405 1,455.24 1,610.09 $154.85 10.64%
Forestville Aqueduct 357 1,173.09 1,289.02 $115.93 9.88% Wholesale/Municipal 944 1,618.39 1750.084 $131.69 8.14% Surplus 48 1,192.01 1,338.40 $146.39 12.28%
Windsor 534 1,173.09 1,289.02 $115.93 9.88%
TOTAL 42,826

WATER TRANSMISSION SYSTEM
FY24-25 REVENUE SUMMARY CHART
DRAFT
2/29/2024
4 [x] ESTIMATED [ ] OFFICIAL CHARGE PER ACRE FOOT:

Santa Rosa Petaluma Sonoma
Aqueduct Aqueduct Aqueduct

PRIME CONTRACTORS
O&M Charge [4.2] $1,015.39 $1,015.39 $1,015.39
Water Management Planning Sub-charge [4.13] $0.35 $0.35 $0.35 Watershed Planning/Restoration Sub-charge [4.14] $40.04 $40.04 $40.04 Recycled Water & Local Supply Sub-charge [4.15] $0.00 $0.00 $0.00 Water Conservation Sub-charge [4.16] $59.55 $59.55 $59.55 O&M Charge $1,115.33 $1,115.33 $1,115.33
Bond & Loan Charges - to pay for existing debt service
Storage Facilities Capital Charge [4.7] 31.47 31.47 31.47 Common Facilities Capital Charge [4.8] 131.22 131.22 131.22 Sonoma Aqueduct Facilities Capital Charges [4.6 b] 145.49 Total Bond & Loan Charges $162.69 $162.69 $308.18
Discretionary:

Aqueduct Capital Charges - to build fund balance for future projects Aqueduct Facilities Capital Charges [4.6 e] 11.00 0.00 34.90 LRT2 - included in Recycled Water & Local Supply Sub-Charge above.

TOTAL PRIME CONTRACTORS $1,289.02 $1,278.02 $1,458.41
Charge without LRT2 and voluntary AQ Capital Charge $1,278.02 $1,278.02 $1,423.51

OTHER AGENCY CUSTOMERS/WHOLESALE CHARGES
(WATER CO’S & PUBLIC AGENCIES)
O&M Charge $1,115.33 $1,115.33 $1,115.33
Capital Charges 162.69 162.69 308.18
Aqueduct Facilities Capital Charge [4.12] $472.06 $472.06 $326.57 TOTAL OTHER AGENCY CUSTOMERS/WHOLESALE CHARGES (4.12) $1,750.08 $1,750.08 $1,750.08 (120% OF HIGHEST PRIME)

FORESTVILLE
O&M Charge [4.2] * $1,015.39
Water Management Planning Sub-charge [4.13] 0.35
Watershed Planning/Restoration Sub-charge [4.14] 40.04
Recycled Water & Local Supply Sub-charge [4.15] -
Water Conservation Sub-charge [4.16] 59.55
O&M Charge $1,115.33
Bond & Loan Charges - to pay for existing debt service
Aqueduct Facilities Capital Charges [4.6] 11.00
Storage Facilities Capital Charge [4.7] 31.47
Common Facilities Capital Charge [4.8] 131.22
Total Capital Charges $173.69
TOTAL FORESTVILLE $1,289.02
* Forestville Water District was exempt from Santa Rosa Aqueduct sub-charge from FY 06/07 to FY 16/17 [4.12].

NORTH MARIN WATER DISTRICT
O&M Charge $1,115.33 Note: N. Marin pays
North Marin Bond & Loan Charge [4.9] 90.54 bond and loan charge Russian River Conservation Charge [4.18 (a)] 159.28 in lieu of Capital Charge.

Russian River Projects Charge [4.18 (b)] 20.00
TOTAL NORTH MARIN WATER DISTRICT 1,385.15

FOURTH OFF-PEAK (MARIN MUNICIPAL)
Highest Prime on SR and PET AQ x 1.11 $1,430.81
Russian River Conservation Charge 159.28
Russian River Projects Charge 20.00
TOTAL FOURTH OFF-PEAK $1,610.09

SUPPLEMENTAL (MARIN MUNICIPAL)
Highest Prime on SR and PET AQ x 1.11 $1,430.81
Russian River Conservation Charge 159.28
Russian River Projects Charge 20.00
TOTAL SUPPLEMENTAL $1,610.09

SURPLUS
Non-Municipal / Municipal [4.11 (a)] $1,338.40 $1,338.40 $1,338.40 (120% of O&M Charge)
Town of Windsor $1,289.02
$1,289.02
The applicable section of the Restructured Agreement has been indicated in brackets.

Beginning in FY22/23 all water delivered to Town of Windsor is charged at the the Santa Rosa Aqueduct rate [4.17 (a)]. Town of Windsor pays all subcharges [4.13, 4.14, 4.15, and 4.16] on all water they divert from the Russian River using their equipment [4.17 (b)].

SONOMA COUNTY WATER AGENCY RATES FOR WATER DELIVERIES IN FY24-25 DRAFT 5
FY 2024-25 BUDGET

SONOMA COUNTY WATER AGENCY
Operations and Maintenance Rate Computation

O & M REVENUE REQUIREMENT
ESTIMATED FISCAL YEAR EXPENDITURES $63,503,959
LESS:

Depreciation Amortization 7,569,000
Investment Income, Interest on Pooled Cash, Charges for Services 285,142 Power Sales 100,000
PWRPA Pre-paid Expense - FY 08/09 Rate Reduction-One time only "Mandatory Prudent Reserve" charge
Use of Fund Balance
Recycled Water funds (Sub-object 7277) taken from special reserve 0 Transfers Out 10,522,486
REVENUE REQUIREMENT (Net Expenditures) $45,027,331

O & M ACRE FOOT BASE
DELIVERIES: 42,826.4
LESS:

Marin Municipal 7,705.4
Surplus (Irrigation) 47.8
TOTAL BASE DELIVERIES 35,073.2
O & M RATE COMPUTATION:

Rate = Revenue Requirement - (Marin Municipal Deliveries x 1.11 x 0.92568 x Highest Prime Rate on Petaluma or Santa Rosa Aqueduct - Subfunds)
Total Deliveries - Surplus Deliveries - Marin Muni Deliveries = 45,027,331 - (4,300.00 x 1221.79) - (3,405.35 x 1221.79) 42,826.4 - 47.8 - 7,705.4
* = 1,015.39
FY24-25
2/29/2024
DRAFT 6
FY23-24 FY24-25
(Actual) (Proposed) % Change
O&M Charge 903.30 1015.39 12.41%
Water Management Planning Sub-Charge 0.00 0.35 N/A
Watershed Planning/Restoration Sub-Charge 35.96 40.04 11.37% Recycled Water Sub-Charge 0.00 0.00 N/A
Water Conservation Sub-Charge 54.08 59.55 10.11%
Total O&M Charge 993.34 1115.33 12.28%
Santa Rosa Aqueduct Rate
O&M Charge 993.34 1115.33 12.28%
Aqueduct Facilities Capital Charges [4.6 e] 11.00 11.00 0.0% Storage Facilities Capital Charge [4.7] 29.14 31.47 7.98% Common Facilities Capital Charge [4.8] 139.61 131.22 -6.01% TOTAL 1173.09 1289.02 9.88%
Petaluma Aqueduct Rate
O&M Charge 993.34 1115.33 12.28%
Aqueduct Facilities Capital Charges [4.6 e] 0.00 0.00 N/A Storage Facilities Capital Charge [4.7] 29.14 31.47 7.98% Common Facilities Capital Charge [4.8] 139.61 131.22 -6.01% TOTAL 1162.09 1278.02 9.98%
Sonoma Aqueduct Rate
O&M Charge 993.34 1115.33 12.28%
Aqueduct Facilities Capital Charges [4.6 e] 34.90 34.90 0.0% Storage Facilities Capital Charge [4.7] 29.14 31.47 7.98% Common Facilities Capital Charge [4.8] 139.61 131.22 -6.01% Sonoma Aqueduct Facilities Capital Charges 151.68 145.49 -4.08% TOTAL 1348.67 1458.41 8.14%
FY24-25
Proposed Water Rates
2/29/2024
DRAFT 7

SONOMA COUNTY WATER AGENCY

RUSSIAN RIVER CONSERVATION CHARGE COMPUTATION
FISCAL YEAR 2024-25
PROPERTY ASSESSMENT VALUES AS OF FY23-24:

TAX CODE ENTITY SECURED UNSECURED TOTAL VALUE
14000 Forestville Co Water District 542,444,046 3,413,480 $545,857,526 42800 City of Cotati 1,399,056,857 32,178,953 1,431,235,810 43500 City of Petaluma 12,424,566,199 511,958,530 12,936,524,729 43800 City of Rohnert Park 7,183,113,523 179,756,461 7,362,869,984 44500 City of Santa Rosa 29,956,887,027 1,024,563,740 30,981,450,767 45000 City of Sonoma 3,559,377,730 105,785,078 3,665,162,808 N/A Valley of the Moon Water District 4,435,638,466 20,265,437 4,455,903,903 TOTAL $59,501,083,848 $1,877,921,679 $61,379,005,527
Notes:
1 Total value of secured and unsecured property in service areas of Prime Water Contractors of Sonoma County (see above) $61,379,005,527 2 2016-17 Sonoma County tax rate per $100 of full cash value assessed for payment of Warm Springs Dam Project Obligations 0.007 3 Total tax levied on citizens residing in service areas of Prime Water Contractors of Sonoma County, i.e., (Line 1/100) x Line 2 $4,296,530
4 Total acre feet of water delivered to Prime Water Contractors of Sonoma County (excluding North Marin and Town of Windsor) plus deliveries to Forestville 26,975.13 during the prior 12 month period ending March 31.
5 Total Russian River Conservation Charge per Acre Foot (Line 3 / Line 4) $159.28 Russian River Projects Charge RR Conservation Charge
Historical calculations Historical calculations
For FY Calculated Actual Charge
06-07 17.02 $17.02 $48.33
07-08 21.4 $20.00 $52.70
08-09 25.08 $20.00 $58.44
09-10 24.68 $20.00 $57.70
10-11 24.4 $20.00 $74.62
11-12 23.44 $20.00 $72.27
12-13 20.38 $20.00 $72.08
13-14 14.72 $14.72 $63.30
14-15 8.72 $8.72 $63.90
15-16 12.39 $12.39 $69.38
16-17 12.96 $12.96 $78.73
17-18 13.08 $13.08 $105.78
18-19 9.13 $9.13 $109.75
19-20 8.34 $8.34 $102.09
20-21 8.68 $8.68 $106.12
21-22 10.63 $10.63 $115.94
22-23 13.92 $13.92 $115.36
23-24 15.79 $15.79 $137.33
24-25 20.37 $20.00 $159.28
2/29/2024
DRAFT 8

SCHEDULE OF WATER DELIVERIES BY AQUEDUCT
PAST 36 MONTHS / 12 MONTHS AVERAGE
DELIVERING AQUEDUCT Monthly
Santa Rosa Petaluma Forestville Sonoma Total
36 Jan-21 1,341.2 2,161.8 25.8 251.8 3,780.6
35 Feb-21 1,137.9 1,750.8 20.3 176.2 3,085.1
34 Mar-21 1,066.4 2,050.6 21.7 170.9 3,309.6
33 Apr-21 1,617.8 3,025.1 36.1 373.9 5,052.9
32 May-21 1,402.9 2,533.3 40.4 388.6 4,365.2
31 Jun-21 1,450.2 2,468.5 40.2 421.5 4,380.3
30 Jul-21 1,863.3 2,297.6 51.0 466.7 4,678.6
29 Aug-21 1,507.9 1,705.1 39.5 315.6 3,568.1
28 Sep-21 1,455.3 1,654.3 36.8 298.1 3,444.4
27 Oct-21 1,514.3 1,842.1 36.7 306.9 3,700.0
26 Nov-21 968.6 1,552.0 17.4 215.8 2,753.9
25 Dec-21 1,228.0 2,149.4 23.5 268.1 3,669.0
24 Jan-22 1073.2 1423.2 18.6 205.2 2,720.2
23 Feb-22 1041.5 1861.2 20.0 195.4 3,118.1
22 Mar-22 1227.5 2175.2 26.0 237.7 3,666.4
21 Apr-22 1233.9 2107.2 24.0 250.7 3,615.8
20 May-22 1649.3 2923.1 33.1 378.7 4,984.0
19 Jun-22 1448.3 2456.3 33.3 380.6 4,318.5
18 Jul-22 1415.9 1538.8 34.9 358.4 3,348.0
17 Aug-22 1752.9 1762.2 44.6 382.9 3,942.7
16 Sep-22 1459.2 1453.6 35.2 277.2 3,225.2
15 Oct-22 1430.9 1549.8 30.9 274.3 3,285.8
14 Nov-22 1132.2 1427.5 23.3 231.8 2,814.8
13 Dec-22 1091.1 1487.9 18.5 210.2 2,807.7
12 Jan-23 1111.4 1374.6 24.5 240.3 2,750.7
11 Feb-23 976.6 1058.4 18.4 171.8 2,225.2
10 Mar-23 1055.7 946.1 19.2 147.2 2,168.1
9 Apr-23 872.7 665.8 20.7 166.8 1,726.0
8 May-23 1388.0 1896.0 30.3 328.2 3,642.6
7 Jun-23 1413.1 2301.5 31.4 348.8 4,094.8
6 Jul-23 1853.3 2813.1 42.0 456.0 5,164.4
5 Aug-23 1832.4 2669.5 42.4 452.9 4,997.1
4 Sep-23 1552.3 2229.6 34.3 427.0 4,243.2
3 Oct-23 1600.8 2423.0 33.1 410.8 4,467.7
2 Nov-23 1201.5 1505.0 25.3 225.0 2,956.7
1 Dec-23 1039.9 1196.3 19.2 152.3 2,407.7
Total Deliveries 48,407.4 68,435.2 1,072.4 10,564.2 128,479.3 3-Year Annual Average 16,135.8 22,811.7 357.5 3,521.4 42,826.4 Past 12 Months 15,897.7 21,078.8 340.8 3,527.1 40,844.4 Total Deliveries 48,407.4 68,435.2 1,072.4 10,564.2 128,479.3 Less: North Marin 16,308.2 16,308.2
Marin Municipal 23,116.1 23,116.1
Sonoma Co. Deliveries 48,407.4 29,011.0 1,072.4 10,564.2 89,055.1 3-Year Annual Average 16,135.8 9,670.3 357.5 3,521.4 29,685.0 2/29/2024
DRAFT 9

SONOMA COUNTY WATER AGENCY SONOMA COUNTY WATER AGENCY
SCHEDULE OF ACTUAL PRIOR 12 MONTHS WATER DELIVERIES IN ACRE FEET (BY CUSTOMER TYPE) ACTUAL WATER DELIVERY DISTRIBUTION BY AQUEDUCT (ACRE FEET) JANUARY THROUGH DECEMBER PRIOR 12 MONTHS
Aqueduct * * * * DELIVERING AQUEDUCT * * * *
No. Jan-23 Feb-23 Mar-23 Apr-23 May-23 Jun-23 Jul-23 Aug-23 Sep-23 Oct-23 Nov-23 Dec-23 TOTAL Santa Rosa Petaluma Sonoma TOTAL PRIMES DELIVERED TO:
1 City of Santa Rosa 1,068.0 940.8 1,002.8 799.8 1,319.5 1,324.0 1,754.5 1,734.8 1,467.7 1,516.3 1,140.3 990.4 15,058.9 2 City of Petaluma 454.7 382.1 386.4 406.2 668.5 631.1 793.7 786.4 677.6 722.7 512.8 411.2 6,833.4 CITY OF SANTA ROSA (A) 2 North Marin Water Dist. 371.8 322.6 222.7 73.9 217.8 287.8 480.2 407.0 286.0 286.2 380.1 336.9 3,673.2 Jan 2023 882.0 0.0 186.1 1,068.0 2 City of Rohnert Park 166.2 143.5 163.7 138.4 211.9 254.2 291.3 250.4 213.3 210.4 168.8 133.8 2,345.9 Feb 2023 783.6 0.0 157.2 940.8 2 City of Cotati 29.7 24.0 23.9 26.5 53.3 50.9 62.6 63.0 38.8 66.3 30.5 22.5 492.0 Mar 2023 839.3 0.0 163.6 1,002.8 1 Town of Windsor 26.1 22.6 44.4 66.3 54.8 54.8 49.5 49.3 48.5 40.8 39.1 37.9 534.0 Apr 2023 671.6 0.0 128.2 799.8 4 City of Sonoma 99.7 85.5 82.6 100.2 180.5 181.1 230.6 219.5 189.0 159.8 83.6 65.1 1,677.2 May 2023 1,061.4 0.0 258.1 1,319.5 4 Valley of the Moon Dist. 130.9 76.0 56.3 58.2 127.3 155.8 208.7 211.4 217.9 232.3 125.4 74.1 1,674.3 Jun 2023 1,180.1 0.0 143.9 1,324.0 TOTAL PRIMES 2,347.2 1,997.1 1,982.9 1,669.4 2,833.7 2,939.6 3,871.1 3,721.8 3,138.7 3,234.9 2,480.6 2,072.0 32,289.0 Jul 2023 1,629.1 0.0 125.4 1,754.5 Aug 2023 1,425.5 0.0 309.3 1,734.8
OTHER AGENCY CUSTOMERS Sep 2023 1,208.8 0.0 258.9 1,467.7 1 Cal-American Water 16.2 12.9 7.9 6.1 12.7 32.7 42.5 42.1 31.9 37.4 17.1 10.9 270.6 Oct 2023 1,213.2 0.0 303.1 1,516.3 2 Penngrove Water Co 11.0 9.4 10.3 11.0 17.8 16.9 20.7 21.0 16.6 17.2 13.7 9.5 175.1 Nov 2023 957.1 0.0 183.2 1,140.3 4 Lawndale Mutual 1.5 1.7 1.2 1.7 3.8 3.8 5.6 5.6 4.9 5.0 7.3 2.7 44.9 Dec 2023 836.1 0.0 154.3 990.4 4 Kenwood Village Water Co 0.6 0.6 0.7 0.8 0.8 0.7 0.9 0.9 0.9 1.2 0.9 1.4 10.6 TOTAL SANTA ROSA 12,687.7 0.0 2,371.2 15,058.9 3 Forestville Co Water Dist. 24.5 18.4 19.2 20.7 30.3 31.4 42.0 42.4 34.3 33.1 25.3 19.2 340.8 1 Other Gov-Santa Rosa Aq 1.0 0.3 0.6 0.6 0.9 0.7 1.0 0.8 0.7 0.9 0.7 0.7 8.8 OTHER PRIME CONTRACTORS (B) 2 Other Gov-Petaluma Aq 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 CITY OF PETALUMA 0.0 6,833.4 6,833.4 4 Other Gov-Sonoma Aq 5.8 6.8 4.8 4.6 5.8 4.7 6.7 10.9 10.9 9.9 5.6 7.5 84.0 NORTH MARIN WATER DISTRICT 3,673.2 3,673.2 TOTAL OTHER AGY. CUST 60.6 50.0 44.8 45.5 72.0 91.0 119.5 123.8 100.3 104.7 70.6 51.9 934.8 CITY OF ROHNERT PARK 91.5 2,254.4 2,345.9 CITY OF COTATI 3.7 488.2 492.0
OFF-PEAK CUSTOMERS TOWN OF WINDSOR 534.0 534.0
2 Marin Municipal 341.3 176.8 139.0 9.8 726.7 1,060.6 1,164.6 1,141.6 997.4 1,120.1 399.0 282.3 7,559.3 CITY OF SONOMA 1,677.2 1,677.2 VALLEY OF THE MOON DISTRICT 1,674.3 1,674.3
SURPLUS CUSTOMERS TOTAL OTHER PRIME CONTRACTORS 629.3 13,249.2 3,351.6 17,230.1 1 Irrigation-Santa Rosa Aq 0.0 0.0 0.0 0.0 0.1 1.0 5.7 5.3 3.5 5.4 4.3 0.0 25.3 2 Irrigation-Petaluma Aq 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 TOTAL DELIVERIES TO PRIMES 13,317.0 13,249.2 5,722.8 32,289.0 4 Irrigation-Sonoma Aq 1.6 1.3 1.5 1.3 10.1 2.5 3.5 4.5 3.4 2.6 2.2 1.5 36.0 TOTAL SURPLUS CUST. 1.6 1.3 1.5 1.3 10.1 3.5 9.2 9.8 6.9 8.0 6.5 1.5 61.3 LESS: NORTH MARIN (3,673.2) (3,673.2) TOTAL DELIVERIES 2,750.7 2,225.2 2,168.1 1,726.0 3,642.6 4,094.8 5,164.4 4,997.1 4,243.2 4,467.7 2,956.7 2,407.7 40,844.4 TOTAL SONOMA COUNTY DELIVERIES 13,317.0 9,576.0 5,722.8 28,615.8 2/29/2024
DRAFT 10
FY 2024-25 BUDGET
Water Transmission System Agency Fund
ESTIMATED WATER DELIVERIES AND WATER SALES - O&M plus Surcharges

ESTIMATED

REVENUE CATEGORY ACRE FEET ESTIMATED ESTIMATED

DELIVERED RATES REVENUE

WATER SALES - O&M
1 PRIMES without Subcharges 34,129.0 1,015.39 34,654,243 2 OTHER AGENCY CUSTOMERS 944.3 1,650.14 1,558,203
3 MARIN MUNICIPAL (OFF-PEAK) 4,300.0 1,221.79 5,253,683 4 MARIN MUNICIPAL (SUPPLEMENTAL) 3,405.4 1,221.79 4,160,616 5 SURPLUS CUSTOMERS 47.8 1,238.46 59,256
TOTAL WATER SALES - O&M 42,826.4 N/A $45,686,001
Note: MMWD rate adjusted per Amended MMWD Water Supply Agreements Effective 7/1/15.

ESTIMATED

REVENUE CATEGORY ACRE FEET ESTIMATED ESTIMATED

DELIVERED RATES REVENUE
WATER SALES - Sub-charges
1a Water Management Planning Sub-charge [4.13] 42,826.4 0.35 15,000 1b Watershed Planning/Restoration Sub-charge [4.14] 42,826.4 40.04 1,714,950 1c Recycled Water & Local Supply Sub-charge [4.15] 42,826.4 0.00 0 1d Water Conservation Sub-charge [4.16] 42,826.4 59.55 2,550,140 TOTAL WATER SALES - Subcharges 42,826.4 N/A $4,280,090
Sub-Object 4175, 4176, 4177, and 4178
2/29/2024
DRAFT 11
FY 2024-25 BUDGET
Water Transmission System Agency Fund
SANTA ROSA AQUEDUCT ESTIMATED WATER DELIVERIES AND WATER SALES - O&M plus Surcharges

ESTIMATED

REVENUE CATEGORY ACRE FEET ESTIMATED ESTIMATED

DELIVERED RATES REVENUE

WATER SALES - O&M
1 SANTA ROSA AQUEDUCT 16,135.8 1,015.39 16,384,165

ESTIMATED

REVENUE CATEGORY ACRE FEET ESTIMATED ESTIMATED

DELIVERED RATES REVENUE
WATER SALES - Sub-charges
1a Water Management Planning Sub-charge [4.13] 16,135.8 0.35 5,652 1b Watershed Planning/Restoration Sub-charge [4.14] 16,135.8 40.04 646,146 1c Recycled Water & Local Supply Sub-charge [4.15] 16,135.8 0.00 0 1d Water Conservation Sub-charge [4.16] 16,135.8 59.55 960,822 TOTAL WATER SALES - Subcharges 16,135.8 N/A $1,612,620

ESTIMATED

REVENUE CATEGORY ACRE FEET ESTIMATED ESTIMATED

DELIVERED RATES REVENUE

CAPITAL CHARGES
Aqueduct Facilities Capital Charges [4.6 e] 16,135.8 11.00 177,494

BOND AND LOAN CAPITAL CHARGES
Storage Facilities Capital Charge [4.7] 16,135.8 31.47 507,726 Common Facilities Capital Charge [4.8] 16,135.8 131.22 2,117,352 Sonoma Aqueduct Facilities Capital Charges [4.6 b] 16,135.8 0.00 0 TOTAL WATER SALES - Capital & Bond and Loan Charges 16,135.8 N/A $2,802,572 TOTAL ESTIMATED REVENUE $20,799,357
Sub-Object 4175, 4176, 4177, and 4178
2/29/2024
DRAFT 12
FY 2024-25 BUDGET
Water Transmission System Agency Fund
PETALUMA AQUEDUCT ESTIMATED WATER DELIVERIES AND WATER SALES - O&M plus Surcharges

ESTIMATED

REVENUE CATEGORY ACRE FEET ESTIMATED ESTIMATED

DELIVERED RATES REVENUE

WATER SALES - O&M
1 PETALUMA AQUEDUCT 22,811.7 1,015.39 23,162,840

ESTIMATED

REVENUE CATEGORY ACRE FEET ESTIMATED ESTIMATED

DELIVERED RATES REVENUE
WATER SALES - Sub-charges
1a Water Management Planning Sub-charge [4.13] 22,811.7 0.35 7,990 1b Watershed Planning/Restoration Sub-charge [4.14] 22,811.7 40.04 913,478 1c Recycled Water & Local Supply Sub-charge [4.15] 22,811.7 0.00 0 1d Water Conservation Sub-charge [4.16] 22,811.7 59.55 1,358,346 TOTAL WATER SALES - Subcharges 22,811.7 N/A $2,279,814

ESTIMATED

REVENUE CATEGORY ACRE FEET ESTIMATED ESTIMATED

DELIVERED RATES REVENUE

CAPITAL CHARGES
Aqueduct Facilities Capital Charges [4.6 e] 22,811.7 0.00 0

BOND AND LOAN CAPITAL CHARGES
Storage Facilities Capital Charge [4.7] 22,811.7 31.47 717,789 Common Facilities Capital Charge [4.8] 22,811.7 131.22 2,993,371 Sonoma Aqueduct Facilities Capital Charges [4.6 b] 22,811.7 0.00 0 TOTAL WATER SALES - Capital & Bond and Loan Charges 22,811.7 N/A $3,711,160 TOTAL ESTIMATED REVENUE $29,153,814
Sub-Object 4175, 4176, 4177, and 4178
2/29/2024
DRAFT 13
FY 2024-25 BUDGET
Water Transmission System Agency Fund
SONOMA AQUEDUCT ESTIMATED WATER DELIVERIES AND WATER SALES - O&M plus Surcharges

ESTIMATED

REVENUE CATEGORY ACRE FEET ESTIMATED ESTIMATED

DELIVERED RATES REVENUE

WATER SALES - O&M
1 SONOMA AQUEDUCT 3,521.4 1,015.39 3,575,610

ESTIMATED

REVENUE CATEGORY ACRE FEET ESTIMATED ESTIMATED

DELIVERED RATES REVENUE
WATER SALES - Sub-charges
1a Water Management Planning Sub-charge [4.13] 3,521.4 0.35 1,233 1b Watershed Planning/Restoration Sub-charge [4.14] 3,521.4 40.04 141,012 1c Recycled Water & Local Supply Sub-charge [4.15] 3,521.4 0.00 0 1d Water Conservation Sub-charge [4.16] 3,521.4 59.55 209,686 TOTAL WATER SALES - Subcharges 3,521.4 N/A $351,931

ESTIMATED

REVENUE CATEGORY ACRE FEET ESTIMATED ESTIMATED

DELIVERED RATES REVENUE

CAPITAL CHARGES
Aqueduct Facilities Capital Charges [4.6 e] 3,521.4 34.90 122,897

BOND AND LOAN CAPITAL CHARGES
Storage Facilities Capital Charge [4.7] 3,521.4 31.47 110,804 Common Facilities Capital Charge [4.8] 3,521.4 131.22 462,082 Sonoma Aqueduct Facilities Capital Charges [4.6 b] 3,521.4 145.49 512,337 TOTAL WATER SALES - Capital & Bond and Loan Charges 3,521.4 N/A $1,208,120 TOTAL ESTIMATED REVENUE $5,135,661
Sub-Object 4175, 4176, 4177, and 4178
2/29/2024
DRAFT 14
FY 2024-25 BUDGET

BEGINNING AND ENDING CASH SUMMARY
Section Title: Water Transmission System Agency Fund
Fund/Department No: 44205 33040100
Actual Estimated Adopted Requested Percent
Account Title 2022-2023 2023-2024 2023-2024 2024-25 Difference Change BEGINNNG FUND BALANCE 21,483,922 12,385,242 8,429,314

REVENUES

USE OF MONEY / PROPERTY
44002 Interest on Pooled Cash 479,924 249,895 249,895 285,142 35,247 14.10% 44003 Other Interest Earnings 0 0 0 0 0 N/A
44050 Unrealized Gains & Losses 15,353 0 0 0 0 N/A
44109 Concessions 0 0 0 0 0 N/A
44101 Rent - Real Estate 0 0 0 0 0 N/A
SUBTOTAL 495,277 249,895 249,895 285,142 35,247 14.10%

INTERGOVERNMENTAL REVENUES
42282 State CalOES Disaster Funding 0 0 0 0 0 N/A
42284 State Cal OES Admin Allowance 0 0 0 0 0 N/A
42358 State Other Funding 0 0 0 0 0 N/A
42441 Federal FEMA Disaster Funding 0 0 0 0 0 N/A
42443 Federal FEMA Admin Allowance 0 0 0 0
42461 Federal Other Funding 0 0 0 0 0 N/A
42610 Other Governmental Agencies 0 0 0 0 0 N/A
42621 North Marin Water District 0 0 0 0 0 N/A
42701 Revenue Appl - PY Intergovmtl 0 0 0 0 0 N/A
SUBTOTAL 0 0 0 0 0 N/A

CHARGES FOR SERVICES
45062 Construct/Bldg Permit Rvw Svcs 0 0 0 0 0 N/A
45065 Inspection Fees 0 0 0 0 0 N/A
45223 Sewer/Water Hook up Fees 22,896 20,000 20,000 20,000 0 0.00% 45301 Charges for Services 15,000 0 0 0 0 N/A
45314 Sale - Power 0 0 100,000 100,000 0 0.00%
45315 Sale - Water, Wholesale 30,733,424 39,429,145 40,029,589 45,686,001 5,656,412 14.13% 45316 Water Conservation 1,788,952 2,229,087 2,263,032 2,550,140 287,108 12.69% 45323 Common Fac Rev Bond Chg 3,433,379 3,986,916 3,986,916 3,889,158 (97,758) (2.45%) 45324 Storage Fac Rev Bond Chg 720,261 832,214 832,214 932,557 100,343 12.06% 45325 Sonoma Aqueduct Rev Bond Chg 409,494 513,148 513,148 512,337 (812) (0.16%) 45327 Santa Rosa Aqueduct Cap Chg 249,649 298,319 298,319 299,408 1,088 0.36% 45328 Petaluma Aqueduct Cap Chg 173,184 0 0 0 0 N/A
45329 Sonoma Aqueduct Cap Chg 146,758 127,572 127,572 116,752 (10,820) (8.48%) 45330 North Marin Rev Bond Chg 457,794 494,028 494,028 492,184 (1,844) (0.37%) 45331 Water Mgmt Plan/Restore Chg 7,515 0 0 15,000 15,000 N/A 45332 Watershed Plan/Restore Chg 1,231,577 1,482,100 1,504,670 1,714,950 210,280 13.98% 45333 Recycled Water & Local Supply 18,840 0 0 0 0 N/A
45401 Revenue Appl PY Chgs for Svcs 0 0 0 0 0 N/A
SUBTOTAL 39,408,722 49,412,529 50,169,488 56,328,487 6,158,999 12.28% 2/29/2024
DRAFT 15
Section Title: Water Transmission System Agency Fund
Fund/Department No: 44205 33040100
Actual Estimated Adopted Requested Percent
Account Title 2022-2023 2023-2024 2023-2024 2024-25 Difference Change

MISCELLANEOUS REVENUES
46027 Insurance Claims Reimbursement 0 0 0 0 0 N/A
46029 Donations/Contributions 0 0 0 0 0 N/A
46040 Miscellaneous Revenue 5,468 0 0 0 0 N/A
46041 Discounts Earned 0 0 0 0 0 N/A
46050 Cancelled/Stale Dated Warrants 979 0 0 0 0 N/A
46200 Revenue Appl PY Misc Revenue 1,357 0 0 0 0 N/A
46205 PY Revenue – Charges for Servi 0 0 0 0 0 N/A
46215 Other Grants 0 0 0 0 0 N/A
SUBTOTAL 7,805 0 0 0 0 N/A

OTHER FINANCING SOURCES
47002 Sale of Capital Assets 0 0 0 0 0 N/A
47101 Transfers In - within a Fund 0 0 0 0 0 N/A
47102 Transfers In - btw Govtl Funds 0 0 0 0 0 N/A
SUBTOTAL 0 0 0 0 0 0

SPECIAL ITEMS
48004 Residual Equity Transfers (696) 0 0 0 0 N/A
SUBTOTAL (696) 0 0 0 0 0
TOTAL REVENUES 39,911,108 49,662,424 50,419,384 56,613,629 6,194,245 #VALUE!

EXPENDITURES

SERVICES AND SUPPLIES
51021 Communications Expense 0 0 0 0 0 N/A
51031 Waste Disposal Services 0 0 0 0 0 N/A
51032 Janitorial Services 7,104 7,000 7,000 7,000 0 0.00% 51041 Insurance - Liability 0 0 0 0 0 N/A
51042 Insurance - Premiums 4,666 0 0 5,000 5,000 N/A
51061 Maintenance - Equipment 2,413,022 4,533,372 2,875,200 2,495,200 (380,000) (13.22%) 51071 Maintenance - Bldg & Improve 0 0 0 0 0 N/A
51072 Landscaping Services 0 0 0 0 0 N/A
51077 Maint-Infrastructure 0 0 0 0 0 N/A
51083 VSP Premiums 0 0 0 0 0 N/A
51205 Advertising/Marketing Svc 4,534 6,000 6,000 5,000 (1,000) (16.67%) 51209 Information Tech Svc (non ISD) 4,007 260 260 3,000 2,740 1053.85% 51211 Legal Services 48,995 28,000 28,000 50,000 22,000 78.57% 51212 Outside Counsel - Legal Advice 450 2,000 2,000 2,500 500 25.00% 51214 Agency Extra/Temp Help 0 0 0 0 0 N/A
51221 Medical/Laboratory Services 14,562 0 0 15,000 15,000 N/A 51226 Consulting Services 0 0 0 0 0 N/A
51230 Security Services 1,429 3,000 3,000 2,000 (1,000) (33.33%) 51231 Testing/Analysis 152,747 200,000 200,000 240,000 40,000 20.00% 51241 Outside Printing and Binding 2,174 500 500 1,500 1,000 200.00% 51242 Bank Charges 14 50 50 50 0 0.00%
51244 Permits/License/Fees 86,072 90,000 90,000 90,000 0 0.00% 51249 Other Professional Services 0 0 0 0 0 N/A
51301 Publications and Legal Notices 0 0 0 0 0 N/A
2/29/2024
DRAFT 16
Section Title: Water Transmission System Agency Fund
Fund/Department No: 44205 33040100
Actual Estimated Adopted Requested Percent
Account Title 2022-2023 2023-2024 2023-2024 2024-25 Difference Change 51401 Rents and Leases - Equipment 358,946 400,000 400,000 400,000 0 0.00% 51402 Rents and Leases - Heavy Eqt 774,323 200,000 200,000 400,000 200,000 100.00% 51421 Rents and Leases - Bldg/Land 0 0 0 0 0 N/A
51601 Training Services 16,989 15,000 15,000 20,000 5,000 33.33% 51602 Business Travel/Mileage 107 6,000 6,000 6,000 0 0.00% 51605 Private Car Expense 660 750 750 750 0 0.00%
51801 Other Services 0 0 0 0 0 N/A
51803 Other Contract Services 3,860,300 11,706,104 11,049,855 12,031,260 981,405 8.88% 51902 Telecommunication Usage 70,554 75,000 75,000 75,000 0 0.00% 51911 Mail Services 17 150 150 150 0 0.00%
51917 District Operations Chgs 17,808,921 18,784,886 18,377,036 20,206,914 1,829,878 9.96% 51921 Equipment Usage Charges 1,056,254 900,000 900,000 1,100,000 200,000 22.22% 52021 Clothing, Uniforms, Personal 14,661 5,000 5,000 8,000 3,000 60.00% 52031 Food 738 500 500 500 0 0.00%
52041 Household Supplies Expense 0 0 0 0 0 N/A
52042 Janitorial Supplies 4,504 0 0 0 0 N/A
52043 Safety Supplies/Equipment 5,823 0 0 6,000 6,000 N/A 52061 Fuel/Gas/Oil 131,762 75,000 75,000 75,000 0 0.00% 52063 Vehicle Parts 490 0 0 500 500 N/A
52071 Materials and Supplies Expense 72,110 35,000 35,000 35,000 0 0.00% 52072 Chemicals 946,748 1,200,000 775,000 1,200,000 425,000 54.84% 52081 Medical/Laboratory Supplies 45,227 25,000 25,000 50,000 25,000 100.00% 52091 Memberships/Certifications 46,282 40,000 40,000 45,000 5,000 12.50% 52101 Other Supplies 143 0 0 0 0 N/A
52111 Office Supplies 7,120 5,000 5,000 7,500 2,500 50.00% 52112 Office Furniture/Fixtures 3,404 0 0 3,500 3,500 N/A 52114 Freight/Postage 22 1,000 1,000 1,000 0 0.00%
52115 Books/Media/Subscriptions 329 500 500 500 0 0.00% 52117 Mail and Postage Supplies 5,978 1,500 1,500 5,000 3,500 233.33% 52141 Minor Equipment/Small Tools 226,228 150,000 150,000 200,000 50,000 33.33% 52142 Computer Equipment/Accessories 4,115 1,000 1,000 2,500 1,500 150.00% 52143 Computer Software/Licensing Fees 4,484 30,000 30,000 30,000 0 0.00% 52162 Special Department Expense 0 0 0 2,191,349 2,191,349 N/A 52171 Water Conservation Program 0 0 0 0 0 N/A
52191 Utilities 3,802 2,000 2,000 3,500 1,500 75.00%
52192 Utilities - Gas/Propane 197 0 0 0 0 N/A
52193 Utilities - Electric 3,852,336 4,250,000 4,250,000 4,250,000 0 0.00% 52194 Utilities - Water 34 0 0 0 0 N/A
SUBTOTAL 32,063,383 42,779,572 39,632,301 45,271,173 5,638,872 14.23%

OTHER CHARGES
53103 Interest on LT Debt 0 0 0 0 0 N/A
53104 Other interest Expense 0 0 0 0 0 N/A
53301 Taxes and Assessments 1,383 0 0 0 0 N/A
53401 Amortization Expense (6,584) 54,000 54,000 83,000 29,000 53.70% 53402 Depreciation Expense 6,944,336 8,000,000 8,000,000 7,486,000 (514,000) (6.43%) 53403 Loss - Disposed Capital Asset 1,001,597 0 0 0 0 N/A 53500 Contributions Non-County Agy 0 0 0 0 0 N/A
53501 Contributions 932,629 745,396 745,396 0 (745,396) (100.00%) 53610 Other Charges 0 0 0 0 0 N/A
SUBTOTAL 8,873,360 8,799,396 8,799,396 7,569,000 (1,230,396) (13.98%) 2/29/2024
DRAFT 17
Section Title: Water Transmission System Agency Fund
Fund/Department No: 44205 33040100
Actual Estimated Adopted Requested Percent
Account Title 2022-2023 2023-2024 2023-2024 2024-25 Difference Change

FIXED ASSETS
19820 Machinery and Equipment 0 0 0 0 0 N/A
19822 Mobile Equipment 0 0 0 0 0 N/A
19824 Computer Equipment 0 0 0 0 0 N/A
19831 CIP - Bldg & Impr 0 0 0 0 0 N/A
19832 CIP - Infrastructure 29,830 0 0 0 0 N/A
19840 Work in Progress - Eqt 0 0 0 0 0 N/A
19841 Work in Progress - Intang 0 130,000 33,700 141,300 107,600 319.29% 19851 Intangible Assets - Non-amort 0 0 0 0 0 N/A
SUBTOTAL 29,830 130,000 33,700 141,300 107,600 319.29%

OTHER FINANCING USES
57011 Transfers Out - within a Fund 8,637,402 9,963,384 10,019,899 10,522,486 502,587 5.02% 57012 Transfers Out - btw Govtl Fund 0 0 0 0 0 N/A
SUBTOTAL 8,637,402 9,963,384 10,019,899 10,522,486 502,587 5.02% APPROP. FOR CONTINGENCIES
55011 Appropriation for Contingency 0 0 0 0 0 N/A
SUBTOTAL 0 0 0 0 0 N/A

REMIBURSEMENTS
58010 Reimb. - General 0 0 0 0 0 N/A
SUBTOTAL 0 0 0 0 0 N/A
ADMIN. CONTROL ACCOUNT
59004 Administrative Control Account 0 0 0 0 0 N/A
59005 Admin Control Acct Clearing 0 0 0 0 0 N/A
SUBTOTAL 0 0 0 0 0 N/A
TOTAL EXPENDITURES 49,603,976 61,672,352 58,485,297 63,503,959 5,018,663 8.58% Adjustments to Reserves/Encumbrances:

Depreciation 6,937,752 8,054,000 7,569,000
Donated Asset (Caltrans) 0
Outstanding Encumbrances - Net Change (7,324,493) 0
Capitalized Interest 0
Gain/Loss on disposal of fixed assets 1,001,597
Unrealized Gain/ Loss (GASB 31) (15,353)
Change in Prepaid Expense (4,303)
Change in Prudent Reserve 0
Post audit adjustments - Payables (1,009)
Use of Fund Balance 0
Rounding (3)
ENDING FUND BALANCE 12,385,242 8,429,314 9,107,984
Operations and Maintenance 44205 Fund Balance Reserve Goal 11,353,118 Over/(Under) Goal (2,245,134)
2/29/2024
DRAFT 18
Water Transmission System Agency Fund
Major Services & Supplies Expenditure Items
Fund/Department No: 44205 33040100
Actual Adopted Requested Percent
FY22-23 FY23-24 FY24-25 Difference Change
51061 Maintenance - Equipment 2,413,022 2,875,200 2,495,200 (380,000) -13.22% 51211 Legal Services 48,995 28,000 50,000 22,000 78.57% 51231 Testing/Analysis 152,747 200,000 240,000 40,000 20.00% 51402 Rents and Leases - Heavy Eqt 774,323 200,000 400,000 200,000 100.00% 51803 Other Contract Services 3,860,300 11,049,855 12,031,260 981,405 8.88% 51917 District Operations Chgs 17,808,921 18,377,036 20,206,914 1,829,878 9.96% 51921 Equipment Usage Charges 1,056,254 900,000 1,100,000 200,000 22.22% 52072 Chemicals 946,748 775,000 1,200,000 425,000 54.84% 52162 Special Department Expense (SCADA) 0 0 2,191,349 2,191,349 N/A 52193 Utilities - Electric 3,852,336 4,250,000 4,250,000 0 0.00% Power demand and costs are expected to align with the FY 2023/2024 budget.

Reflects five year average expenditures.

Reflects five year average expenditures.

Decrease attributable to lower budgeted expenses and $260,000 in projects that have been deferred to reduce the rate increase.

Increase attributable to increased maintenance project costs related to collector maintenance, cathodic protection, tank recoats, tank maintenance, arc flash studies, hydrogeologic investigations, and water system comprehensive master planning, offset by $1.92M in projects that have been deferred to reduce the rate increase.

Increase attributable to water Transmission System’s share of SCADA capital projects.

Increase associated with expanded sampling and analysis tied to the Santa Rosa Plain Wells Projects as well as additional microplastics and Perfluoroalkyl/Polyfluoroalkyl Substances (PFAS) testing.

Increase is attributable to an increase in labor costs for maintenance projects (cathodic protection, tank recoats, tank maintenance, pump/meter/valve replacements, collector maintenance, SCADA upgrades), studies (arc flash studies, hydrogeologic investigations, Regional Water Supply Resiliency, Seismic Mitigation Studies, Water System Comprehensive Master Plan, Wohler and Mirabel Collector Variable Frequency Drive (VFD) Study, emergency inventory procurement, and mitigation monitoring for recently completed FEMA projects, offset by projects deferred to reduce the rate increase. Approximately, 5% of this increase is due to negotiated labor rates.

Increase due to elevated chlorine and caustic soda costs. Input costs grew by 71% in FY 2022/2023 and are on track to increase further in FY 2024/2025.

Increase attributable to elevated equipment needs to implement current suite of maintenance projects. 2/29/2024
DRAFT 19

AMOUNT DEFERRED
AMOUNT
Routine Maintenance
1 Water Operations Equipment and Supplies 50,000
2 Electrical/Instrumentation Equipment and Supplies 400,000 3 Warm Springs Dam Equipment and Supplies 50,000
4 Production and Treatment Equipment and Supplies 250,000 5 Transmission and Storage Equipment and Supplies 350,000 6 Meter and Backflow Equipment and Supplies 200,000
7 Plains Wells Equipment and Supplies 50,000
-
O&M Projects -
8 Caustic Soda Metering Pump Replacement 196,000
9 C1 MOV Replacement 121,000
10 Ely Booster Meter Replacement 44,000
11 PLC Replacement at Wohler 44,000
12 RDS Dam Fill Pipeline Replacement 165,000
13 C5 Reach Rod Replacement 94,900
-
14 Emergency Inventory Procurement 400,000 260,000
15 Seismic Response Training and Exercise 25,000
16 SurfaceWater/Groundwater Monitoring Equipment 30,000 17 Software License Fees (Matlab/Innovyze/Syrinix/Goldsim/Kisters 25,300 $ 2,495,200 $ 260,000
2024-25
Water Transmission System Agency Fund
51061 Maintenance - Equipment
2/29/2024
DRAFT 20
Other Contract Services AMOUNT DEFERRED
AMOUNT
O&M Projects
1 Collector 6 Roof Repair 220,000
2 Collector 5 Structural Evaluation 150,000
Security Projects -
3 Seismic Response Concept of Operations Planning - 150,000 Infrastructure -
4 As-Needed Electrical Design Services 150,000
5 As-Needed O&M Engineering Services - 75,000
6 Asset Management 100,000
7 Cathodic Protection - Maintenance 100,000
8 Cathodic Protection - Site Assesment and Design Support 100,000 9 Cathodic Protection - SR/Cotati 2,709,500
10 Hazardous Materials Management 50,000
11 LHMP Program Planning 30,000
12 Riverfront Park Maintenance - Regional Parks 100,000 13 AMI Lease Agreements 25,000
14 Tank Maintenance Program 1,798,000
15 Tank Recoating Program 4,327,800 3,890,757
16 TPW Pavement Preservation Program 25,000
17 Transmission System Condition Assessments - 200,000
18 Water Transmission System Transient Analysis 200,000 Advocacy
19 Community Outreach Program 40,000
20 Bay Area 5,500
21 North Coast 35,000
22 Government Affairs - Legislative Program 125,000
Studies
23 Arc Flash Studies 320,460
24 Collector Wells, AQs, Tanks Seismic Mitigation Study 50,000 25 DeMuth Property Hydrogeologic Investigation 450,000
26 Hearn Avenue Feasibility Study 100,000
27 Regional Water Supply Resiliency Study 150,000
28 RR Collector Multi-Year Operational Analysis 100,000 29 Transmission System Support Modeling 25,000
30 Water System Comprehensive Master Plan 400,000 100,000 31 Water System Standards 45,000
32 Wohler and Mirabel Collector VFD Study 100,000
33 Discount to reduce rate -
$ 12,031,260 $ 4,415,757
Special Department Expense AMOUNT DEFERRED
AMOUNT
1 SCADA Improvements 2,191,349 600,311
$ 2,191,349 $ 600,311
Labor associated with deferred projects $ 173,700
Total amount of work deferred in Fund $ 5,449,768
51803
52162
2/29/2024
DRAFT 21
51803 Other Contract Services & 53501 Contributions Project Information FY24-25 Asset Management 100,000
The primary objectives of Sonoma Water’s Asset Management Program (AMP) are to improve the cost-effective management of assets throughout their life cycle, promote data sharing and interconnectivity, and demonstrate fiscal responsibility. Phase 1 included review of Sonoma Water’s current asset management practices, development of an AMP vision and charter, asset management framework. Phase 2 included condition assessment of the water production facilities (Mirabel & Wohler); assessment of the water tanks, booster stations, and other miscellaneous water facilities; and of several of the wastewater treatment facilities. In addition, the new Computerized Maintenance Management System (CMMS) software implementation is underway and is anticipated to go-live in the spring 2024.

To date the AMP has delivered: Asset Management Framework Tech Memo; State of the Assets Tech Memos; Asset Management Implementation Plan (AMIP) Report; Asset Management Program Statement of Commitments; assessment of the water and wastewater facilities; and have begun the implementation of the CMMS software. In FY 24/25, Phase 3 will involve integrating the recommendations during Phase 2 into the full roll-out of the enterprise-wide AMP, implementing the selected CMMS software, furthering data management and integration and continuing with additional condition assessments of water and wastewater facilities.

Collector 6 Roof Repair 220,000
The existing roof gutter system has failed on the Collector Well 6 building. This failure allows rainwater to leak into the interior of the building and onto the switchgear. This poses a significant safety hazard during rain events and risk to the equipment. This project will relocate the gutters and perform other related work. This effort will also include an analysis of the roof access, including the hatch and ladder system.

This project has not previously received funding and therefore no efforts have begun; however, tarps have been placed above the switchgear to protect the equipment from damage. In FY24-25, a solution to repair the gutter system will be selected and the work will be completed.

Cathodic Protection - SR/Cotati 2,709,500
Provide improvements to upgrade the cathodic protection system along the existing Santa Rosa Aqueduct and Russian River-Cotati Intertie. The project includes designing and constructing a new corrosion protection system to protect the pipeline from corrosion and monitor the state of the pipelines. The corrosion protection system will have a useful life of approximately 50 years, and will allow for remote assessment and data collection to quantify the condition of the pipeline and state of the cathodic protection system. The project will be constructed in two phases with a completed project that consists of 27 corrosion protection well sites and 51 test stations.

In FY 21-22, design efforts commenced and CEQA environmental review was completed for the project. FY 22-23 funding was used to continue advancing design of Phase 1 though progress was limited due to staffing changes and assigning a new project manager to the project. In FY23-24, Sonoma Water reengaged design consultants and plans on advertising construction of Phase 1. In FY24-25, award and construction of Phase 1 is anticipated along with advancing environmental permit applications and necessary right-of-way to continue design development of Phase 2.

Collector 5 Structural Evaluation 150,000
Sonoma Water has conducted preliminary structural evaluations of the Collector buildings and hoist support structures within to support a proposed hoist load capacity increase from 10 tons to 12.5 tons. Preliminary analyses suggest the Collector 5 floor slab does not appear to be adequate for the proposed 12.5 ton hoist load or the original building load.

In FY 23/24, a preliminary structural evaluation was conducted. In FY 24/25, Sonoma Water plans on conducting more sophisticated and detailed structural evaluation possibly including finite element modeling to determine what improvements may be needed to meet loading demands.

LHMP Program Planning 30,000
The LHMP program planning provides for the maintenance and update to the Local Hazard Mitigation Plan (required for FEMA funding) and the preliminary development of mitigation project concepts for the purposes of preparing grant applications and refining projected costs of projects associated with the Natural Hazard Reliability Mitigation Program.

FY 22-23 funding was used to commence development of the 2023 LHMP Update. In FY23-24, the 2023 draft LHMP Update was finalized and was submitted to CalOES for approval. In FY24-25 Sonoma Water expects to receive CalOES and FEMA approval, and funding may be needed to address comments prior to approval as well as to begin discussions and any necessary coordination with the County’s Multijurisdictional LHMP update. 2/29/2024
DRAFT 22
51803 Other Contract Services & 53501 Contributions Project Information FY24-25 Tank Maintenance Program 1,798,000
Sonoma County Water Agency (Sonoma Water) owns and operates 18 water storage tanks with a total combined capacity of 128.8 million gallons as a part of the water transmission system that provides clean drinking water to approximately 600,000 residents in nine major cities and water districts within Sonoma and Marin counties. Maintaining these tanks is critical. This program covers a 10-year agreement for maintenance services with a Service Provider.

In FY 23/24 Enhanced Washout Cleaning and Inspections will be conducted on 4 tanks, and Visual Inspections will be conducted on 9 tanks. FY24/25 funding will be used to conduct Enhanced Washout Cleaning and Inspections on 2 tanks and Visual Inspections for remaining tanks.

Tank Recoating Program 4,327,800
Water storage tanks are an integral component of Sonoma Water’s transmission and supply system and provide operational flexibility and system supply resiliency when demand exceeds production capacity. In total, Sonoma Water’s 18 welded steel water tanks provide 129 million gallons of storage, which is approximately three times the average daily system demand. Welded-steel tanks are susceptible to corrosion and have a limited functional lifespan of approximately 50 years without coatings. With regularly scheduled and targeted maintenance, monitoring, and recoating activities welded-steel tanks can attain a lifespan of over 100 years. Sonoma Water’s Tank Recoating Program specifically targets the protection and maintenance of welded-steel tanks by designing and implementing tank rehabilitation projects that include interior and exterior recoating, structural repairs, and installation of cathodic protection systems to maximize the functional life of each facility.

In FY 21-22 Sonoma Water began developing plans for the recoating of the Kastania and Cotati No.1 tanks. FY 22-23 funding was used to award construction at the Kastania and Cotati No. 1 tanks and to initiate design of the Cotati No. 3 tank recoating project. Work in FY 23-24 at Kastania and Cotati No. 1 will include interior and exterior coating removal and replacement, structural repairs to corroded roof rafters, and other ancillary repairs. Design of Cotati No. 3 recoat will also continue with plans to award construction. FY24/25 efforts will focus on completing Cotati No. 1 recoat, initiating Cotati No. 3 recoat, and designing and awarding construction for Ralphine No. 1 and Sonoma No. 1 tanks.

Water Transmission System Transient Analysis 200,000
Sonoma Water completed a comprehensive transient analysis of the water transmission system in 1999. In support of specific projects, the study was partially updated for select locations in 2003, 2007, and 2013. Utilizing a contemporary modeling platform, a new system-wide study will be prepared for the current status of the transmission system. The study will identify and recommend solutions to address current transient vulnerabilities in the water transmission system.

Efforts in support of this project in FY 23-24 are focused on completing the record documentation of air valve improvements that have been made to the transmission system in recent years in order to accurately inform the subsequent transient analysis modeling. In FY24-25 Sonoma Water plans on engaging a consultant to update a system-wide transient analysis aimed at identifying CIP projects needed to address and mitigate any existing system vulnerabilities to surge and pressure transients.

Studies
Arc Flash Studies 320,460
Proper data collection including knowledge of both the electrical and physical layout and proper operation and setting of protective devices is essential for accurate arc flash analysis and labeling of equipment.

Up to date short circuit and coordination studies are required to perform an arc flash hazard analysis. Based on recommended practices utilizing industry accepted computer software, in FY24-25 Sonoma Water will conduct an analysis on the water system. The analysis will provide evaluation and settings of each protective device as required by the National Electrical Code.
2/29/2024
DRAFT 23
51803 Other Contract Services & 53501 Contributions Project Information FY24-25 Collector Wells, AQs, Tanks Seismic Mitigation Study 50,000 The seismic mitigation planning study will advance feasibility evaluation and refine strategic approaches to implementing measures to mitigate failure risks of the water transmission system to specific seismic vulnerabilities identified as part of prior natural hazard reliability studies. Particular focus of the study will evaluate: 1) liquefaction mitigation solutions to protect collector wells at the Wohler-Mirabel production facilities, 2) strategies that best balance risk mitigation of aqueduct failure at numerous locations of potential seismic vulnerability against a cost-effective and timely implementation approach (including conducting a broad CPT investigation at numerous sites), and 3) analyze alternative seismic retrofit solutions at select water storage tanks.

In FY 22/23, a consultant was contracted to initiate the planning study, coordinating geotechnical investigations, and securing necessary permits and permission to enter agreements. In FY23/24, CPT investigations were performed along with seismic assessment of the water storage tanks. Preliminary design of liquefaction mitigation solution of Collector 5 was also commenced to assess feasibility of implementing a secant pile wall concept. In FY24/25, funding will be utilized to finalize the preliminary design of Collector 5, assess the feasibility to expand design concepts to other collectors, and prepare a final report.

DeMuth Property Hydrogeologic Investigation 450,000
The DeMuth property hydrogeologic investigation will advance feasibility evaluation of siting additional diversion facilities (i.e., a well field or additional collector well) within the DeMuth parcels adjoining the eastern bank of the Russian River, just south of Wohler Bridge. In December 2023, two monitoring wells were drilled and constructed on the parcel using Sonic drill rig. Continuous core samples collected during the drilling of the boreholes were comprised primarily of course sands and gravels. The monitoring wells have been equipped pressure/temperature transducers that will be collecting hourly water level and temperature data throughout the winter and spring of 2024. In December 2023, Sonoma Water entered into an agreement with Collier Geophysics to perform land based geophysics at the parcel. It is anticipated that the geophysical investigation will be completed in the first quarter of 2024. Based on the information provided by the monitoring wells and ground based geophysics, Sonoma Water staff will make a recommendation on whether to perform further hydrologic investigations at the parcel that would likely include: (1) drilling and constructing additional monitoring wells; (2) drilling and construction of a high capacity test well; and (3) performing a step-drawdown pump test and aquifer pump test. This work would likely be performed during the third quarter of 2024. Additional work may also include: (1) leveraging existing internal modeling tools to estimate well production efficiencies and potential well interference with existing collector wells and nearby irrigation wells; and (2) assessing strategies for mitigating seismic risks to existing Wohler/Mirabel diversion facilities by siting new diversion facilities on the DeMuth parcels.

Hearn Avenue Feasibility Study 100,000
There are six buried butterfly valves at the Hearn Avenue Valve Farm. Valve #2 has failed. Due to this valve’s proximity to other buried valves at this facility and the difficulty to replace valves at this location, staff want to ensure the resources to expose and replace valve #2 are properly used. This study will review the following aspects of Hearn Avenue Valve Farm: valve selection, piping design, constructability, and site layout.

This project has not been budgeted yet, so no work has begun. During FY24-25 a consultant will be hired to assist SCWA with analyzing this location and the valve replacement project(s). 2/29/2024
DRAFT 24
51803 Other Contract Services & 53501 Contributions Project Information FY24-25 Regional Water Supply Resiliency Study 150,000
Retail water providers to over 600,000 people in Sonoma and Marin Counties are regionally connected through existing water supply infrastructure. Along with purchasing wholesale water from the Sonoma County Water Agency, each retail provider also has local supplies which are used to meet the demands of their customers. Although these systems are connected, they are not operated or managed in a coordinated manner, especially in times of water shortage.

Development of a decision support tool could be used to evaluate strategies and water supply projects that would make the region more resilient to future water shortages.

Funds expended in FY 19/20 were used to develop a work plan in cooperation with Sonoma Water’s Water Contractors.

Funds budgeted for FY 20/21 were expended building a decision support model to evaluate the region’s resiliency to drought under historical operations with existing facilities. In cooperation with Sonoma Water’s contractors, scenarios were developed and evaluated that either through operational changes or new water supply facilities could improve the region’s resiliency to drought. Funds budgeted for FY 21/22 were expended using the decision support model to complete analysis of scenarios focused on drought resiliency and to begin evaluating water shortage scenarios resulting from disruptions to Sonoma Water’s water supply and transmission system due to natural hazards such as seismic events, wildfires and flooding. Funds budgeted for FY 22/23 were expended translating the results of the update to the Natural Hazard Reliability Assessment prepared by Inferterra, to likely damage scenarios to Sonoma Water’s transmission system infrastructure. Funds budgeted for FY23/24 were expended completing modeling scenarios for the development and evaluation of projects and strategies to improve the regions water supply reliability during periods of water supply shortage due to seismic events. Funds budgeted for FY24/25 will be used completing a final report documenting the study results and providing ongoing support for efforts to improve the regions water supply resiliency.

RR Collector Multi-Year Operational Analysis 100,000
SCWA is required to periodically send DDW a report evaluating various water quality parameters. This report is used to determine whether SCWA’s collector wells are characteristic of a groundwater system. This project will allow a consultant to compile and analyze the previous ten years of data and studies to demonstrate that SCWA is still a groundwater system.

No work was completed during FY22-23. In FY23-24 a consultant has been selected and an agreement is being negotiated.

Water System Comprehensive Master Plan 400,000
Sonoma Water aims to develop a Comprehensive Water System Master Plan (Master Plan) to define the programs, policies, and projects required to meet the potable water infrastructure needs of Sonoma Water’s service area for the next 20-years. Master Plan development will consider future system demands, current system conditions, and required system improvements. This Master Plan will yield a prioritized list of projects, serving as a guide for financial commitments needed to ensure sufficient operation of the water system’s infrastructure. The subject item requests approval of a consultant agreement for Master Plan development services.

Wohler and Mirabel Collector VFD Study 100,000
The Collector Wells at Wohler & Mirabel produce the vast majority of Sonoma Water’s potable drinking water. The 12 pumps in these collectors consume a large amount of electricity. Variable Frequency Drives (VFDs) offer cost savings and operational flexibility to pumping systems. High voltage VFDs have also reduced in cost and increased in availability in recent years. To become more energy efficient and allow for more operational flexibility, Sonoma Water will study how the addition of VFDs could improve the operation of Wohler & Mirabel and determine how much energy would be saved if they were installed.

No work has been completed on this study yet. Once funding is approved in FY24-25, a consultant will be hired to complete this study.
2/29/2024
DRAFT 25
FY 2024-25 BUDGET

BEGINNING AND ENDING CASH SUMMARY
Section Title: Water Management Planning
Fund/Department No: 44210 33041000
Actual Estimated Adopted Requested Percent
Account Title 2022-2023 2023-2024 2023-2024 2024-25 Difference Change BEGINNING FUND BALANCE 369,637 381,063 286,420

REVENUES

USE OF MONEY / PROPERTY
44002 Interest on Pooled Cash 6,826 5,357 5,357 7,366 2,009 37.50% 44050 Unrealized Gains and Losses 1,527 0 0 0 0 N/A
SUBTOTAL 8,354 5,357 5,357 7,366 2,009 37.50%

INTERGOVERNMENTAL REVENUE
42619 Town of Windsor 466 0 0 852 852 N/A
SUBTOTAL 466 0 0 852 852 N/A

CHARGES FOR SERVICES
45301 Charges for Services 0 0 0 0 0 N/A
SUBTOTAL 0 0 0 0 0 N/A

OTHER FINANCING SOURCES
47101 Transfers In - within a Fund 7,515 0 0 15,000 15,000 N/A 47102 Transfers In - btw Govtl Fund 0 0 0 0 0 N/A
SUBTOTAL 7,515 0 0 15,000 15,000 N/A
TOTAL REVENUES 16,334 5,357 5,357 23,218 17,861 333.41%

EXPENDITURES

SERVICES AND SUPPLIES
51205 Advertising Marketing 0 0 0 0 0 N/A
51211 Legal Services 0 0 0 0 0 N/A
51212 Legal Services - External 0 0 0 0 0 N/A
51241 Outside Printing & Binding 0 0 0 0 0 N/A
51601 Training/Conference Expense 0 0 0 0 0 N/A
51602 Business Travel/Mileage 0 0 0 0 0 N/A
51605 Private Car Expense 0 0 0 0 0 N/A
51803 Other Contract Services 35,152 75,000 75,000 100,000 25,000 33.33% 51917 District Operations Chgs 3,380 25,000 25,000 45,000 20,000 80.00% 51921 Equipment Usage Charges 0 0 0 0 0 N/A
52171 Water Conservation Program 0 0 0 0 0 N/A
SUBTOTAL 38,532 100,000 100,000 145,000 45,000 45.00%

OTHER CHARGES
53103 Interest on LT Debt 0 0 0 0 0 N/A
53501 Contributions 0 0 0 0 0 N/A
SUBTOTAL 0 0 0 0 0 N/A

OTHER FINANCING USES
57011 Transfers Out - within a Fund 0 0 0 0 0 N/A
57012 Transfers Out - btw Govtl Fun 0 0 0 0 0 N/A
SUBTOTAL 0 0 0 0 0 N/A
TOTAL EXPENDITURES 38,532 100,000 100,000 145,000 45,000 45.00% Adjustments to Reserves/Encumbrances:

Outstanding Encumbrances - Net Change 35,152 0 0
Audit Adjustment (A/P) 0 0 0
Unrealized Gain/ Loss (GASB 31) (1,527) 0 0
Rounding (1)
ENDING FUND BALANCE 381,063 286,420 164,638
2/29/2024
DRAFT 26
FY 2024-25 BUDGET

BEGINNING AND ENDING CASH SUMMARY
Section Title: Watershed Planning/Restoration
Fund/Department No: 44215 33041100
Actual Estimated Adopted Requested Percent
Account Title 2022-2023 2023-2024 2023-2024 2024-25 Difference Change BEGINNING FUND BALANCE 15,629,400 12,743,787 4,396,136

REVENUES

USE OF MONEY / PROPERTY
44002 Interest on Pooled Cash 271,386 45,028 45,028 119,377 74,349 165.11% 44050 Unrealized Gains and Losses 42,971 0 0 0 0 N/A
SUBTOTAL 314,356 45,028 45,028 119,377 74,349 165.11%

INTERGOVERNMENTAL REVENUE
42461 Federal Other Funding 0 0 0 0 0 N/A
42619 Town of Windsor 76,241 87,446 87,446 97,387 9,942 11.37% SUBTOTAL 76,241 87,446 87,446 97,387 9,942 11.37%

CHARGES FOR SERVICES
45301 Charges for Services 0 0 0 0 0 N/A
45332 Watershed Plan/Restore Chg 0 40,000 40,000 40,000 0 0.00% Subtotal Charges for Services 0 40,000 40,000 40,000 0 0.00%

MISCELLANEOUS REVENUE
46021 Capital Grants - Federal 0 0 0 0 0 N/A
46029 Donations/Contributions 0 0 0 0 0 N/A
46040 Miscellaneous Revenue 0 0 0 0 0 N/A
46041 Discounts Earned 0 0 0 0 0 N/A
46050 Cancelled/Stale Dated Warrant 1,000 0 0 0 0 N/A
46200 Revenue Appl PY Misc Revenu 25,125 0 0 0 0 N/A
SUBTOTAL 26,125 0 0 0 0 N/A

OTHER FINANCING SOURCES
47101 Transfers In - within a Fund 1,231,577 1,482,100 1,504,670 1,714,950 210,280 13.98% 47102 Transfers In - btw Govtl Funds 0 0 0 0 0 N/A
SUBTOTAL 1,231,577 1,482,100 1,504,670 1,714,950 210,280 13.98% TOTAL REVENUES 1,648,299 1,654,574 1,677,144 1,971,714 294,570 17.56%

EXPENDITURES

SERVICES AND SUPPLIES
51021 Communication Expense 0 0 0 0 0 N/A
51061 Maintenance - Equipment 9,992 0 0 0 0 N/A
51205 Advertising Marketing 926 0 0 0 0 N/A
51209 Information Tech Svc (non ISD) 152 0 0 0 0 N/A
51211 Legal Services 15,338 0 0 0 0 N/A
51212 Legal Services - External 647 0 0 0 0 N/A
51221 Medical/Laboratory Services 0 0 0 0 0 N/A
51226 Consulting Services 0 0 0 0 0 N/A
51231 Testing/Analysis 94,758 0 0 0 0 N/A
51241 Outside Printing and Binding 2,342 0 0 0 0 N/A
51244 Permits/License/Fees 65,772 0 0 0 0 N/A
51401 Rents and Leases - Equipment 36,865 0 0 0 0 N/A
51402 Rents and Leases - Heavy Eqt 32,338 0 0 0 0 N/A
51601 Training/Conference 0 0 0 0 0 N/A
51602 Business Travel/Mileage 0 0 0 0 0 N/A
51605 Private Car Expense 33 0 0 0 0 N/A
51801 Other Services 0 0 0 0 0 N/A
51803 Other Contract Services 1,609,720 2,122,113 1,624,870 538,000 (1,086,870) (66.89%) 51902 Telecommunication Usage 0 0 0 0 0 N/A
51917 District Operations Chgs 2,547,346 6,129,612 2,883,800 2,423,300 (460,500) (15.97%) 51921 Equipment Usage Charges 60,525 0 0 0 0 N/A
2/29/2024
DRAFT 27
Section Title: Watershed Planning/Restoration
Fund/Department No: 44215 33041100
Actual Estimated Adopted Requested Percent
Account Title 2022-2023 2023-2024 2023-2024 2024-25 Difference Change 52021 Clothing, Uniforms, Personal 3,931 0 0 0 0 N/A
52031 Food 319 0 0 0 0 N/A
52042 Janitorial Supplies 0 0 0 0 0 N/A
52043 Safety Supplies/Equipment 0 0 0 0 0 N/A
52061 Fuel/Gas/Oil 0 0 0 0 0 N/A
52063 Vehicle Parts 0 0 0 0 0 N/A
52071 Materials and Supplies Expense 31,417 0 0 0 0 N/A 52081 Medical/Laboratory Supplies 0 0 0 0 0 N/A
52091 Memberships/Certifications 0 0 0 0 0 N/A
52101 Other Supplies 0 0 0 0 0 N/A
52111 Office Supplies 19 0 0 0 0 N/A
52114 Freight/Postage 0 0 0 0 0 N/A
52115 Books/Media 741 0 0 0 0 N/A
52117 Mail and Postage Supplies 104 0 0 0 0 N/A
52141 Minor Equipment/Small Tools 737 0 0 0 0 N/A
52142 Computer Equipment/Accessor 0 0 0 0 0 N/A
52143 Computer Software 0 0 0 0 0 N/A
52144 Equipment Allowance 50 0 0 0 0 N/A
52181 Business Meals/Supplies 0 0 0 0 0 N/A
52191 Utilities Expense 0 0 0 0 0 N/A
SUBTOTAL 4,514,070 8,251,725 4,508,670 2,961,300 (1,547,370) (34.32%)

OTHER CHARGES
53104 Other Interest Expense 0 0 0 0 0 N/A
53402 Depreciation Expense 7,665 8,000 8,000 8,000 0 0.00% 53403 Loss - Disposed Capital Asset 0 0 0 0 0 N/A
53501 Contributions 0 0 0 0 0 N/A
SUBTOTAL 7,665 8,000 8,000 8,000 0 0

REIMBURSEMENTS
58010 Reimb. - General 0 0 0 0 0 N/A
SUBTOTAL 0 0 0 0 0 N/A

FIXED ASSETS
19840 Acq-WIP-Equipment 0 0 0 0 0 N/A
19841 Acq-WIP-Intangibles 430,966 1,750,500 488,000 488,000 0 19851 Intangible Assets - Non-amort 0 0 0 0 0 N/A
SUBTOTAL 430,966 1,750,500 488,000 488,000 0 0

OTHER FINANCING USES
57011 Transfers Out - within a Fund 0 0 0 0 0 N/A
57012 Transfers Out - btw Govtl Fund 0 0 0 0 0 N/A
SUBTOTAL 0 0 0 0 0 N/A
TOTAL EXPENDITURES 4,952,701 10,010,225 5,004,670 3,457,300 (1,547,370) (30.92%) Adjustments to Reserves/Encumbrances:

Outstanding Encumbrances - Net Change 500,665 0
Capital Interest 0 0
Depreciation 7,665 8,000 8,000
Change in prepaid expense 0 0
Gain/loss on disposal of Capital Assets 0
Unrealized Gain/ Loss (GASB 31) (42,971) 0
Audit Adjustment (A/P) 0 0
Post Audit Adjustment (46,571)
Rounding 0 0
ENDING FUND BALANCE 12,743,787 4,396,136 2,918,550
2/29/2024
DRAFT 28
FY 2024-25 BUDGET

BEGINNING AND ENDING CASH SUMMARY
Section Title: Recycled Water and Local Supply
Fund/Department No: 44220 33041200
Actual Estimated Adopted Requested Percent
Account Title 2022-2023 2023-2024 2023-2024 2024-25 Difference Change BEGINNING FUND BALANCE 294,825 753,037 259,162

REVENUES

USE OF MONEY / PROPERTY
44002 Interest on Pooled Cash 13,033 6,125 6,125 8,158 2,033 33.20% 44050 Unrealized Gains and Losses (186) 0 0 0 0 N/A
SUBTOTAL 12,847 6,125 6,125 8,158 2,033 33.20%

INTERGOVERNMENTAL REVENUE
42358 State Other Funding 0 0 0 0 0 N/A
42619 Town of Windsor 1,166 0 0 0 0 N/A
SUBTOTAL 1,166 0 0 0 0 N/A

CHARGES FOR SERVICES
45301 Charges for Services 0 0 0 0 0 N/A
45333 Recycled Water & Local Supply 0 0 0 0 0 N/A
45401 Revenue Appl PY Chgs for Svcs 0 0 0 0 0 N/A
SUBTOTAL 0 0 0 0 0 0

MISCELLANEOUS REVENUE
46022 Capital Grants-State 0 0 0 0 0 N/A
46029 Donations/Contributions 0 0 0 0 0 N/A
46200 Revenue Appl PY Misc Revenue 0 0 0 0
46029 Donations/Contributions 0 0 0 0 0 N/A
SUBTOTAL 0 0 0 0 0 N/A

OTHER FINANCING SOURCES
47101 Transfers In - within a Fund 18,840 0 0 0 0 N/A
47102 Transfers In - btw Govtl Funds 0 0 0 0 0 N/A
SUBTOTAL 18,840 0 0 0 0 N/A
TOTAL REVENUES 32,852 6,125 6,125 8,158 2,033 33.20%

EXPENDITURES

SERVICES AND SUPPLIES
51021 Communication Expense 0 0 0 0 0 N/A
51061 Maintenance - Equipment 0 0 0 0 0 N/A
51205 Advertising/Marketing Svc 0 0 0 0 0 N/A
51209 Information Tech Svc (non ISD) 0 0 0 0 0 N/A
51211 Legal Services 0 0 0 0 0 N/A
51212 Legal Services - External 0 0 0 0 0 N/A
51226 Consulting Services 0 0 0 0 0 N/A
51241 Outside Printing and Binding 0 0 0 0 0 N/A
51244 Permits/License/Fees 0 0 0 0 0 N/A
51401 Rents and Leases - Equipment 0 0 0 0 0 N/A
51601 Training Services 0 0 0 0 0 N/A
51602 Business Travel/Mileage 0 0 0 0 0 N/A
51803 Other Contract Services 0 450,000 0 0 0 N/A
51902 Telecommunication Usage 0 0 0 0 0 N/A
51915 ISD - Reprographics Services 0 0 0 0 0 N/A
51917 District Operations Chgs 4,751 0 0 0 0 N/A
51921 Equipment Usage Charges 0 0 0 0 0 N/A
52031 Food 0 0 0 0 0 N/A
2/29/2024
DRAFT 29
Section Title: Recycled Water and Local Supply
Fund/Department No: 44220 33041200
Actual Estimated Adopted Requested Percent
Account Title 2022-2023 2023-2024 2023-2024 2024-25 Difference Change 52061 Fuel/Gas 0 0 0 0 0 N/A
52101 Other Supplies 0 0 0 0 0 N/A
52115 Books/Media/Subscriptions 0 0 0 0 0 N/A
52117 Mail and Postage Supplies 0 0 0 0 0 N/A
52141 Minor Equipment/Small Tools 0 0 0 0 0 N/A
52143 Computer Software/Licensing Fees 0 0 0 0 0 N/A
52171 Water Conservation Program 0 0 0 0 0 N/A
52191 Utilities Expense 0 0 0 0 0 N/A
SUBTOTAL 4,751 450,000 0 0 0 N/A

OTHER CHARGES
53103 Interest on LT Debt 0 0 0 0 0 N/A
53104 Other Interest Expense 0 0 0 0 0 N/A
53402 Depreciation Expense 5,966 6,000 6,000 6,000 0 0.00% 53501 Contributions 23,661 50,000 50,000 25,000 (25,000) (50.00%) SUBTOTAL 29,627 56,000 56,000 31,000 (25,000) (44.64%)

FIXED ASSETS
19831 CIP - Bldg & Impr 0 0 0 0 0 N/A
19832 CIP - Infrastructure 0 0 0 0 0 N/A
19841 Work in Progress - Intang 0 0 0 0 0 N/A
SUBTOTAL 0 0 0 0 0 N/A

OTHER FINANCING USES
57011 Transfers Out - within a Fund 0 0 0 0 0 N/A
57012 Transfers Out - btw Govtl Fund 0 0 0 0 0 N/A
SUBTOTAL 0 0 0 0 0 N/A
TOTAL EXPENDITURES 34,378 506,000 56,000 31,000 (25,000) (44.64%) Adjustments to Reserves/Encumbrances:

Outstanding Encumbrances - Net Change 0 0
Change in Windsor Reserve 453,585 0
Capital Interest 0 0 0
Depreciation 5,966 6,000 6,000
Audit Adjustment (A/P) 0 0 0
Unrealized Gain/ Loss (GASB 31) 186 0 0
Rounding 1 0
ENDING FUND BALANCE 753,037 259,162 242,321
2/29/2024
DRAFT 30
FY 2024-25 BUDGET

BEGINNING AND ENDING CASH SUMMARY
Section Title: Water Conservation
Fund/Department No: 44225 33041300
Actual Estimated Adopted Requested Percent
Account Title 2022-2023 2023-2024 2023-2024 2024-25 Difference Change BEGINNING FUND BALANCE 1,180,750 375,348 106,249

REVENUES

USE OF MONEY / PROPERTY
44002 Interest on Pooled Cash 19,501 3,351 3,351 2,563 (788) (23.52%) 44050 Unrealized Gains and Losses 27,794 0 0 0 0 N/A
SUBTOTAL 47,296 3,351 3,351 2,563 (788) (23.52%)

INTERGOVERNMENTAL REVENUE
42358 State Other Funding 213,370 3,278,597 1,849,210 0 (1,849,210) (100.00%) 42461 Federal Other Funding 0 0 0 1,036,360 1,036,360 N/A 42601 County of Sonoma 59,386 0 0 0 0 N/A
42610 Other Governmental Agencies 0 0 0 0 0 N/A
42611 City of Santa Rosa 0 0 0 0 0 N/A
42612 City of Petaluma 0 0 0 0 0 N/A
42613 City of Rohnert Park 0 0 0 0 0 N/A
42615 City of Cotati 0 0 0 0 0 N/A
42618 City of Sonoma 0 0 0 0 0 N/A
42619 Town of Windsor 110,748 131,519 131,519 144,816 13,297 10.11% 42621 North Marin Water District 0 0 0 0 0 N/A
0 0 0 0
SUBTOTAL 383,504 3,410,116 1,980,729 1,181,176 (799,553) (40.37%)

CHARGES FOR SERVICES
45301 Charges for Services 15,241 42,000 42,000 42,000 0 0.00% 45316 Water Conservation 0 0 0 0 0 N/A
SUBTOTAL 15,241 42,000 42,000 42,000 0 0.00%

MISCELLANEOUS REVENUE
46021 Capital Gains - Federal 0 0 0 0 0 N/A
46022 Capital Grants - State 0 0 0 0 0 N/A
46029 Donations/Contributions 0 85,000 85,000 58,000 (27,000) (31.76%) 46040 Miscellaneous Revenue 0 0 0 0 0 N/A
46041 Discounts Earned 0 0 0 0 0 N/A
46050 Cancelled/Stale Dated Warrants 4,053 0 0 0 0 N/A
46200 Revenue Appl PY Misc Revenue 40,500 0 0 0 0 N/A
46204 PY Intergovmntl Rev - Other 6,386 0 0 0 0 N/A
46215 Other Grants 0 0 0 0 0 N/A
SUBTOTAL 50,939 85,000 85,000 58,000 (27,000) (31.76%)

OTHER FINANCING SOURCES
47101 Transfers In - within a Fund 1,788,952 2,229,087 2,263,032 2,550,140 287,108 12.69% 47102 Transfers In - btw Govtl Funds 0 0 0 0 0 N/A
SUBTOTAL 1,788,952 2,229,087 2,263,032 2,550,140 287,108 12.69% TOTAL REVENUES 2,285,931 5,769,553 4,374,112 3,833,879 (540,233) (12.35%)

EXPENDITURES

SERVICES AND SUPPLIES
51021 Communication Expense 0 0 0 0 0 N/A
51032 Janitorial Services 0 0 0 0 0 N/A
51061 Maintenance - Equipment 4,835 0 0 0 0 N/A
51071 Maintenance - Bldg & Improve 26 0 0 0 0 N/A
51205 Advertising/Marketing Svc 107,455 0 0 0 0 N/A
51209 Information Tech Svc (non ISD) 558 0 0 0 0 N/A
2/29/2024
DRAFT 31
Section Title: Water Conservation
Fund/Department No: 44225 33041300
Actual Estimated Adopted Requested Percent
Account Title 2022-2023 2023-2024 2023-2024 2024-25 Difference Change 51211 Legal Services 2,397 0 0 0 0 N/A
51214 Agency Extra/Temp Help 0 0 0 0 0 N/A
51225 Training Services 0 0 0 0 0 N/A
51230 Security Services 0 0 0 0 0 N/A
51241 Outside Printing and Binding 26,780 43,000 43,000 41,000 (2,000) (4.65%) 51244 Permits/License 0 0 0 0 0 N/A
51249 Other Professional Services 0 0 0 0 0 N/A
51250 Planning/Mapping/Inspections 0 0 0 0 0 N/A
51301 Publications and Legal Notices 0 0 0 0 0 N/A
51401 Rents and Leases - Equipment 661 0 0 0 0 N/A
51601 Training Services 11,580 0 0 0 0 N/A
51602 Business Travel/Mileage 24 13,000 13,000 13,000 0 0.00% 51605 Private Car Expense 1,029 0 0 0 0 N/A
51801 Other Services 0 0 0 0 0 N/A
51803 Other Contract Services 563,666 1,158,642 1,063,668 236,000 (827,668) (77.81%) 51902 Telecommunication Usage 0 0 0 0 0 N/A
51915 ISD Reprographics Services 0 0 0 0 0 N/A
51917 District Operations Chgs 2,172,753 2,049,000 2,049,000 2,200,000 151,000 7.37% 51921 Equipment Usage Charges 18,396 0 0 0 0 N/A
52021 Clothing, Uniforms 268 0 0 0 0 N/A
52031 Food 2,595 0 0 0 0 N/A
52042 Janitorial Supplies 798 0 0 0 0 N/A
52043 Safety Supplies/Equipment 43 0 0 0 0 N/A
52061 Fuel/Gas/Oil 0 0 0 0 0 N/A
52071 Materials and Supplies Expense 19,864 78,000 78,000 93,500 15,500 19.87% 52091 Memberships/Certifications 5,824 12,000 12,000 12,000 0 0.00% 52101 Other Supplies 0 0 0 0 0 N/A
52111 Office Supplies 291 0 0 0 0 N/A
52112 Office Furniture/Fixtures 0 0 0 0 0 N/A
52114 Freight/Postage 137 0 0 0 0 N/A
52115 Books/Media/Subscriptions 181 0 0 0 0 N/A
52117 Mail and Postage Supplies 140 0 0 0 0 N/A
52141 Minor Equipment/Small Tools 2,078 0 0 0 0 N/A
52142 Computer Equipment/Accessories 0 0 0 0 0 N/A
52162 Special Department Expense 0 0 0 0 0 N/A
52171 Water Conservation Program 30,000 294,500 294,500 273,000 (21,500) (7.30%) 52181 Business Meals/Supplies 0 0 0 0 0 N/A
SUBTOTAL 2,972,377 3,648,142 3,553,168 2,868,500 (684,668) (19.27%)

OTHER CHARGES
53500 Contributions Non-County Agy 0 0 0 0 0 N/A
53501 Contributions 198,888 2,390,511 1,062,074 1,026,000 (36,074) (3.40%) 53502 Community Grants 3,120 0 0 0 0 N/A
SUBTOTAL 202,008 2,390,511 1,062,074 1,026,000 (36,074) (3.40%)

OTHER FINANCING USES
57011 Transfers Out - within a Fund 0 0 0 0 0 N/A
57012 Transfers Out - btw Govtl Fund 0 0 0 0 0 N/A
SUBTOTAL 0 0 0 0 0 N/A
TOTAL EXPENDITURES 3,174,385 6,038,653 4,615,242 3,894,500 (720,742) (15.62%) Adjustments to Reserves/Encumbrances:

Outstanding Encumbrances - Net Change 1,502 0 0
Change in Windsor Reserve 115,844 0 0
Change in Prepaid Expense (6,500) 0 0
Unrealized Gain/ Loss (GASB 31) (27,794) 0 0
Post Audit Adjustment 0 0 0
Rounding 0 0 0
ENDING FUND BALANCE 375,348 106,249 45,627
2/29/2024
DRAFT 32
Water Transmission Budget
2024-25
Itemized Detail for Subfunds Consulting/Contractual Services Budget FY24-25
Water Management Planning
Annual Water Supply and Demand Assessment: Develop scope, cost, and schedule to complete a water supply and demand analysis and preparation and submittal of the required Annual Water Shortage Assessment Report to the Department of Water Resources by July 1 each year. Results of the Annual Assessment are also required to inform the work of Sonoma Water’s contractors’ Assessment Reports to DWR.

In FY 22-23 the AWSDA report was completed as described and results shared with the water contractors to inform the completion of their reports. Sonoma Water’s completed AWSDA was filed with DWR prior to the July 1, 2023 reporting deadline. In FY 23-24 the AWSDA will gain be completed as described and results shared with the water contractors to inform the completion of their reports. Sonoma Water’s completed AWSDA will be filed with DWR prior to the July 1, 2024 reporting deadline. The same tasks will be completed in FY 24-25. $ 50,000
Watershed Planning/Restoration
RRIFR Decision 1610 Change Petition: Russian River Flows: Continued preparation of Environmental Impact Report for Fish Habitat Flows and Water Rights Project (Fish Flow Project EIR) in preparation for Board of Directors consideration for certification. Consultant services for responses to comments on the Draft EIR, preparation of recirculated Draft EIR, and any additional impact analysis, flow modeling, and monitoring, needed. Fish Flow Project EIR. The EIR is being prepared by Sonoma Water staff, with assistance from consultants on some areas of analysis. A Draft EIR was released on August 19, 2016. In FY22/232, most of the work focused on preparing the recirculated Draft EIR. Work also includes submission of annual Temporary Urgency Change (TUC) Petitions to the State Board to approve the requested changes to minimum in-stream flows as identified in the Biological Opinion and fisheries and water quality monitoring and reporting required by any State Board TUC Order. Work being accomplished in FY23/243 includes updates to modeling and project analysis, and lab analysis for water quality monitoring under the multiple TUC Orders issued in 2023. Work anticipated for FY24/25 includes work on the recirculated draft EIR as well as lab analysis for water quality monitoring related to the annual TUC. $ 183,000
RRIFR Estuary Management: Required Annual Biological Opinion Activities: Sonoma Water, in consultation with the National Marine Fisheries Service (NMFS), California Department of Fish & Wildlife (CDFW) and the U.S. Army Corps of Engineers (Corps), is required to annually prepare a lagoon outlet adaptive management plan by April 1; conduct and record monthly surveys of the beach topography and the outlet channel; use a time lapse video camera to record the interaction of waves, tides and the river mouth; conduct baseline monitoring of seals and other pinnipeds, conduct estuary water quality monitoring, conduct juvenile steelhead and coho salmon rearing surveys, and prepare annual reports. Other FY22/23 and FY23/24 activities include installation and monitoring of downstream migrant salmonid traps and water quality monitoring stations. Work being completed in FY23/24 includes preparation of the annual adaptive management plan, renewing regulatory permits, and continuation of monitoring and studies. Work anticipated for FY24/25 includes renewing regulatory permits and monitoring studies. $ 95,000
Upper Russian River Water Quality Monitoring: This water quality monitoring was conducted for the Upper Russian River, including the East Fork Russian River above Lake Mendocino and Lake Mendocino to contribute to planning and modeling efforts for the Potter Valley Project (PVP), Lake Mendocino management, Fish Habitat Flows and Water Rights Project, the Forecast Informed Reservoir Operations (FIRO) projects, and drought conditions. Monitoring included the deployment of datasondes and collection of grab samples, as well as laboratory analysis. Work anticipated for FY24/25 includes the efforts described above.
$ 25,000
DRAFT
2/29/2024
33 Water Transmission Budget
2024-25
Itemized Detail for Subfunds Consulting/Contractual Services Budget FY24-25
$ 303,000
Recycled Water and Local Supply
Funding for Groundwater Management in FY 24/25 for Groundwater Sustainability activitie inlcuding fee's to the Santa Rosa Plain Groundwater Sustainability Agency. $ 25,000
$ 25,000
Water Conservation
51241-Outside Printing and Binding
WUE/Water Ed Program materials, Eco-Friendly Garden Tour materials. $ 41,000 51602-Business Travel/Mileage
Attend local and statewide meetings representing the Partnership and Sonoma Water $ 13,000 51803-Other Contract Services
Garden Sense Contract: Funding provides onsite visits by local master gardeners to support local turf removal programs $ 20,000 Green Business Program: Funding to staff a part time position which provides water assessments for local businesses pursuing the Green Business Certification $ 30,000
Landscape Maintenance Manual: Funding for Spanish translation of the Landscape Design Templates Maintenance Manual $ 3,000 Online Educational Content: Development of online educational content $ 10,000 Plant Labeling Program: Funding for nursery liaison to ensure locally appropriate plants are labeled $ 20,000 QWEL: Instructors to teach QWEL trainings and Database maintenance contract $ 53,000 Sonoma County Fair: WUE focused display, materials and hardware for education and distribution at the Sonoma County fair $ 10,000 SMSWP website: Website hosting, maintenance, and development. $ 4,000 Water Ed Bus Contract: Shuttle from school to field study sites for Water Education Program $ 50,000 Water Loss Programs: Technical assistance for regional water loss meetings, regional program assistance, and validation services for contractor annual water loss audits $ 36,000
$ 236,000
DRAFT
2/29/2024
34 Water Transmission Budget
2024-25
Itemized Detail for Subfunds Consulting/Contractual Services Budget FY24-25
51917-District Operations Chgs
Salaries, benefits and overhead costs for staff assigned to projects budgeted within the Water Conservation Fund $ 2,200,000 52071-Materials and Supplies Expense
Water Ed Teaching Materials: pH strips, fabric for displays, youth outreach displays, pencil sharpeners, pencils, classroom testing kits, maps, workbooks, rulers, toothbrushes, stickers, etc. $ 93,500
52091-Memberships/Certifications
Irrigation Association Certificate Renewals, Water Education Foundation, and California Water Efficiency Partnership, Alliance for Water Efficiency, etc. $ 12,000 52171-Water Conservation Program
Outdoor Water Use Focused Programs: Russian River Friendly biennial landscape symposium $ 3,000 Public Information/Outreach Programs: Media campaign for the Sonoma-Marin Saving Water Partnership including media ad buy, ad development, DIY toolkits $ 160,000
Saving Water Partnership Wholesaler Support: Act as the regional liaison attend meetings of the CalWEP, Alliance for Water Efficiency, North Coast CLCA, CA Science Teachers Association, environmental education conference $ 20,000 School Education Program: Such as assembly program, port-a-potties, steelhead in the classroom program, youth outreach events, teacher program, teacher trainings, educational workbooks, maps $ 70,000 Seminars, Workshops, Training: Host trainings/ workshops to benefit the Partnership, such as Water Loss, WELO; Participation in national/statewide studies such as those conducted by CalWEP and AWE $ 20,000 $ 273,000
Total $ 2,868,500
DRAFT
2/29/2024
35 FY 2024-25 BUDGET

BEGINNING AND ENDING CASH SUMMARY
Section Title: Santa Rosa Aqueduct Capital Fund
Fund/Department No: 44230 33045000
Actual Estimated Adopted Requested Percent
Account Title 2022-2023 2023-2024 2023-2024 2024-25 Difference Change BEGINNING FUND BALANCE 9,118,684 9,662,681 9,357,224

REVENUES

USE OF MONEY / PROPERTY
44002 Interest on Pooled Cash 157,422 217,372 217,372 314,171 96,799 44.53% 44003 Other Interest Earnings 0 0 0 0 0 N/A
44050 Unrealized Gains & Loss (18,943) 0 0 0 0 N/A
SUBTOTAL 138,479 217,372 217,372 314,171 96,799 44.53%

MISCELLANEOUS REVENUES
46040 Miscellaneous Revenue 0 0 0 0 0 N/A
46021 Capital Grants - Federal 0 0 0 0 0 N/A
46029 Donations/Contributions 0 0 0 0 0 N/A
46050 Cancelled/Stale Dated W 0 0 0 0 0 N/A
SUBTOTAL 0 0 0 0 0 N/A

ADMINISTRATIVE CONTROL ACCOUNT
49002 Advances 0 0 0 0 0 N/A
49003 Advances Clearing 0 0 0 0 0 N/A
SUBTOTAL 0 0 0 0 0 N/A

OTHER FINANCING SOURCES
47101 Transfers In - within a F 249,649 298,319 298,319 299,408 1,088 0.36% 47102 Transfers In - btw Govtl 0 0 0 0 0 N/A
SUBTOTAL 249,649 298,319 298,319 299,408 1,088 0.36%

SPECIAL ITEMS
48004 Residual Equity Transfe 0 0 0 0 0 N/A
SUBTOTAL 0 0 0 0 0 N/A
TOTAL REVENUES 388,129 515,691 515,691 613,579 97,887 18.98%

EXPENDITURES

OTHER CHARGES
53103 Interest on LT Debt 0 0 0 0
53104 Other Interest Expense 0 0 0 0
53105 Costs of Issuance 0 0 0 0
SUBTOTAL 0 0 0 0 0 N/A

FIXED ASSETS
19820 Machinery and Equipme 0 0 0 0
19822 Mobile Equipment 0 0 0 0
19824 Computer Equipment 0 0 0 0
19831 CIP - Bldg & Impr 0 0 0 0
19832 CIP - Infrastructure 7,115 821,148 0 0 0 N/A
19840 Work in Progress - Eqt 0 0 0 0
2/29/2024
DRAFT 36
Section Title: Santa Rosa Aqueduct Capital Fund
Fund/Department No: 44230 33045000
Actual Estimated Adopted Requested Percent
Account Title 2022-2023 2023-2024 2023-2024 2024-25 Difference Change 19841 Work in Progress - Intan 0 0 0 0
19851 Intangible Assets - Non- 0 0 0 0
SUBTOTAL 7,115 821,148 0 0 0 N/A

OTHER FINANCING USES
57011 Transfers Out - within a 0 0 0 0 0 N/A
SUBTOTAL 0 0 0 0 0 N/A
TOTAL EXPENDITURES 7,115 821,148 0 0 0 N/A
Adjustments to Reserves/Encumbrances:

Repayment of Loan to Storage 0 0 0
Unrealized Gain/ Loss (GASB 31) 144,040 0 0
Capitalized Interest 18,943 0 0
Post Audit Adjustment 0 0 0
Rounding 0 0 0
ENDING FUND BALANCE 9,662,681 9,357,224 9,970,803
2/29/2024
DRAFT 37
FY 2024-25 BUDGET

BEGINNING AND ENDING CASH SUMMARY
Section Title: Petaluma Aqueduct Capital Fund
Fund/Department No: 44235 33045100
Actual Estimated Adopted Requested Percent
Account Title 2022-2023 2023-2024 2023-2024 2024-25 Difference Change BEGINNING FUND BALANCE 7,843,323 7,672,321 4,591,157

REVENUES

USE OF MONEY / PROPERTY
44002 Interest on Pooled Cash 131,401 127,610 127,610 104,762 (22,848) (17.90%) 44003 Other Interest Earnings 0 0 0 0 0 N/A
44050 Unrealized Gains & Losses 8,729 0 0 0 0 N/A
SUBTOTAL 140,130 127,610 127,610 104,762 (22,848) (17.90%)

MISCELLANEOUS REVENUE
46021 Capital Gains - Federal 82,791 2,613,333 0 0 0 N/A SUBTOTAL 82,791 2,613,333 0 0 0 N/A

ADMINISTRATIVE CONTROL ACCOUNT
49002 Advances 0 0 0 0 0 N/A
49003 Advances Clearing 0 0 0 0 0 N/A
SUBTOTAL 0 0 0 0 0 N/A

OTHER FINANCING SOURCES
47101 Transfers In - within a Fund 173,184 0 0 0 0 N/A
47102 Transfers In - btw Govtl Funds 0 0 0 0 0 N/A
SUBTOTAL 173,184 0 0 0 0 N/A
TOTAL REVENUES 396,104 2,740,943 127,610 104,762 (22,848) (17.90%)

EXPENDITURES

OTHER CHARGES
53103 Interest on LT Debt 0 0 0 0
53104 Other Interest Expense 0 0 0 0
53105 Costs of Issuance 0 0 0 0
53403 Loss - Disposed Capital Asset 0 0 0 0
SUBTOTAL 0 0 0 0 0 N/A

FIXED ASSETS
19820 Machinery and Equipment 0 0 0 0
19822 Mobile Equipment 0 0 0 0
19824 Computer Equipment 0 0 0 0
19831 CIP - Bldg & Impr 0 0 0 0
19832 CIP - Infrastructure 587,456 5,822,107 3,168,900 2,841,016 (327,884) (10.35%) 19840 Work in Progress - Eqt 0 0 0 0 0 N/A
19841 Work in Progress - Intang 10,853 0 0 0 0 N/A
19851 Intangible Assets - Non-amort 0 0 0 0
SUBTOTAL 598,309 5,822,107 3,168,900 2,841,016 (327,884) (10.35%) 2/29/2024
DRAFT 38
Section Title: Petaluma Aqueduct Capital Fund
Fund/Department No: 44235 33045100
Actual Estimated Adopted Requested Percent
Account Title 2022-2023 2023-2024 2023-2024 2024-25 Difference Change

SPECIAL ITEMS
56030 Residual Equity Transfers 0 0 0 0 0 N/A
SUBTOTAL 0 0 0 0 0 N/A

OTHER FINANCING USES
57011 Transfers Out - within a Fund 0 0 0 0 0 N/A
SUBTOTAL 0 0 0 0 0 N/A
TOTAL EXPENDITURES 598,309 5,822,107 3,168,900 2,841,016 (327,884) (10.35%) Adjustments to Reserves/Encumbrances:

Advance to Common 0 0 0
Increase/(Decrease) in Loan Payable 0 0 0
Capitalized Interest 0 0 0
Loss on Fixed Asset 0 0 0
Principal Received on Loan 0 0 0
Change in Encumbrances 39,932 0 0
Donated Asset 0 0 0
Unrealized Gain/ Loss (GASB 31) (8,729) 0 0
Rounding (1)
ENDING FUND BALANCE 7,672,321 4,591,157 1,854,903
2/29/2024
DRAFT 39
FY 2024-25 BUDGET

BEGINNING AND ENDING CASH SUMMARY
Section Title: Sonoma Aqueduct Capital Fund
Fund/Department No: 44240 33045200
Actual Estimated Adopted Requested Percent
Account Title 2022-2023 2023-2024 2023-2024 2024-25 Difference Change BEGINNING FUND BALANCE 126,146 43,111 28,883

REVENUES

USE OF MONEY / PROPERTY
44002 Interest on Pooled Cash 4,836 6,350 6,350 1,615 (4,734) (74.56%) 44003 Other Interest Earnings 0 0 0 0 0 N/A
44050 Unrealized Gains & Losses 17,876 0 0 0 0 N/A
SUBTOTAL 22,712 6,350 6,350 1,615 (4,734) (74.56%)

MISCELLANEOUS REVENUES
46200 Transfers In - within a Fund 61,352 0 0 0 0 N/A
SUBTOTAL 61,352 0 0 0 0 N/A

OTHER FINANCING SOURCES
47101 Transfers In - within a Fund 6,401,758 127,572 127,572 116,752 (10,820) (8.48%) 47102 Transfers In - btw Govtl Fund 0 135,000 135,000 95,000 (40,000) (29.63%) SUBTOTAL 6,401,758 262,572 262,572 211,752 (50,820) (19.35%)

SPECIAL ITEMS
48004 Residual Equity Transfers 0 0 0 0 0 N/A
SUBTOTAL 0 0 0 0 0 N/A
TOTAL REVENUES 6,485,821 268,922 268,922 213,368 (55,554) (20.66%)

EXPENDITURES

OTHER CHARGES
53103 Interest on LT Debt 0 0 0 0
53104 Other Interest Expense 0 0 0 0
53105 Costs of Issuance 0 0 0 0
53403 Loss-Disposed Capital Asset 0 0 0 0
SUBTOTAL 0 0 0 0 0 N/A

FIXED ASSETS
19820 Machinery and Equipment 0 0 0 0
19822 Mobile Equipment 0 0 0 0
19824 Computer Equipment 0 0 0 0
19831 CIP - Bldg & Impr 0 0 0 0
19832 CIP - Infrastructure 646,731 283,150 283,150 173,200 (109,950) (38.83%) 19840 Work in Progress - Eqt 0 0 0 0
19841 Work in Progress - Intang 0 0 0 0
19851 Intangible Assets - Non-amor 0 0 0 0
SUBTOTAL 646,731 283,150 283,150 173,200 (109,950) (38.83%)

OTHER FINANCING USES
57011 Transfers Out - within a Fund 0 0 0 0 0 N/A
SUBTOTAL 0 0 0 0 0 N/A
TOTAL EXPENDITURES 646,731 283,150 283,150 173,200 (109,950) (38.83%) Adjustments to Reserves/Encumbrances:

Outstanding Encumbrances - Net Change 195,751 0 0
Sale or Purchase of Fixed Asset 0 0 0
Unrealized Gain/ Loss (GASB 31) (17,876) 0 0
Post Audit Adjustment (6,100,000)
Rounding 0 0 0
ENDING FUND BALANCE 43,111 28,883 69,051
2/29/2024
DRAFT 40
FY 2024-25 BUDGET

BEGINNING AND ENDING CASH SUMMARY
Section Title: Storage Facilities
Fund/Department No: 44250 33043000
Actual Estimated Adopted Requested Percent
Account Title 2022-2023 2023-2024 2023-2024 2024-25 Difference Change BEGINNING FUND BALANCE 1,279,741 2,225,427 2,060

REVENUES

USE OF MONEY / PROPERTY
44002 Interest on Pooled Cash 23,309 5,412 5,412 262 (5,150) (95.17%) 44050 Unrealized Gains & Losses (10,524) 0 0 0 0 N/A
SUBTOTAL 12,785 5,412 5,412 262 (5,150) (95.17%)

MISCELLANEOUS REVENUE
46021 Capital Grants - Federal 0 0 0 0 0 N/A
46022 Capital Grants - State 0 0 0 0 0 N/A
46029 Donations/Contributions 0 0 0 0 0 N/A
46040 Miscellaneous Revenue 0 0 0 0 0 N/A
46041 Discounts Earned 0 0 0 0 0 N/A
46200 PY Revenue - Miscellaneous 0 0 0 0 0 N/A
SUBTOTAL 0 0 0 0 0 N/A
Administrative Control
49002 Advances 0 0 0 0 0 N/A
49003 Advances Clearing 0 0 0 0 0 N/A
SUBTOTAL 0 0 0 0 0 N/A

OTHER FINANCING SOURCES
47101 Transfers In - within a Fund 1,120,000 47,000 117,000 55,000 (62,000) (52.99%) 47102 Transfers In - btw Govtl Funds 0 238,000 288,000 1,232,000 944,000 327.78% SUBTOTAL 1,120,000 285,000 405,000 1,287,000 882,000 217.78% TOTAL REVENUES 1,132,785 290,412 410,412 1,287,262 876,850 213.65%

EXPENDITURES

OTHER CHARGES
53103 Interest on LT Debt 0 0 0 0 0 N/A
53104 Other Interest Expense 0 0 0 0 0 N/A
53403 Loss - Disposed Capital Asset 0 0 0 0
SUBTOTAL 0 0 0 0 0 N/A

FIXED ASSETS
19831 CIP - Bldg & Impr 0 0 0 0 0 N/A
19832 CIP - Infrastructure 46,789 2,513,779 897,335 1,245,086 347,751 38.75% 19841 Acq-WIP-Intangibles 11,020 0 0 0 0 N/A
19851 Intangible Assets - Non-amort 0 0 0 0 0 N/A
SUBTOTAL 57,809 2,513,779 897,335 1,245,086 347,751 38.75% 2/29/2024
DRAFT 41
Section Title: Storage Facilities
Fund/Department No: 44250 33043000
Actual Estimated Adopted Requested Percent
Account Title 2022-2023 2023-2024 2023-2024 2024-25 Difference Change

ADMINISTRATIVE CONTROL ACCOUNT
59002 Advances 0 0 0 0 0 N/A
59003 Advances Clearing 0 0 0 0 0 N/A
SUBTOTAL 0 0 0 0 0 N/A

OTHER FINANCING USES
57011 Transfers Out - within a Fund 0 0 0 0 0 N/A
SUBTOTAL 0 0 0 0 0 N/A
TOTAL EXPENDITURES 57,809 2,513,779 897,335 1,245,086 347,751 38.75% Adjustments to Reserves/Encumbrances:

Repayment of Loan from SR Aqueduct Cap 0 0 0
Princ. Pymnt on loan from SR Aqueduct Ca 0 0 0
Advances 0 0 0
Outstanding Encumbrances - Net Change 0 0 0
PY CIP adjustment - reclass to PY Exp 0 0 0
B & I Tsfrs 0 0 0
LTD Proceeds 0 0 0
Sold Asset 0 0 0
Capitalized Interest 0 0 0
Move Project CIP Balance 0 0 0
Gain/loss on disposal of Capital Assets 0 0 0
Unrealized Gain/ Loss (GASB 31) 10,524 0 0
Change in Encumbrances (139,813) 0 0
Rounding (1) 0 0
ENDING FUND BALANCE 2,225,427 2,060 44,236
2/29/2024
DRAFT 42
FY 2024-25 BUDGET

BEGINNING AND ENDING CASH SUMMARY
Section Title: Common Facilities
Fund/Department No: 44260 33043200
Actual Estimated Adopted Requested Percent
Account Title 2022-2023 2023-2024 2023-2024 2024-25 Difference Change BEGINNING FUND BALANCE 5,478,793 11,595,612 6,315,470

REVENUES

USE OF MONEY / PROPERTY
44002 Interest on Pooled Cash 122,693 68,343 68,343 103,245 34,902 51.07% 44003 Other Interest Earnings 0 0 0 0 0 N/A
44050 Unrealized Gains & Losses 75,567 0 0 0 0 N/A
SUBTOTAL 198,260 68,343 68,343 103,245 34,902 51.07%

CHARGES FOR SERVICES
45062 Construct/Bldg Permit Rvw Svc 0 0 0 0 0 N/A
SUBTOTAL 0 0 0 0 0 N/A

MISCELLANEOUS REVENUES
46021 Capital Grants - Federal 3,104,626 0 0 0 0 N/A
46022 Capital Grants - State 694,444 3,841,976 1,140,000 0 (1,140,000) (100.00%) 46027 Insurance Claims Reimburseme 902,597 0 0 0 0 N/A
46029 Donations/Contributions 0 0 0 0 0 N/A
46040 Miscellaneous Revenue 0 0 0 0 0 N/A
46041 Discounts Earned 0 0 0 0 0 N/A
46200 Revenue Appl PY Misc Revenu 399 0 0 0 0 N/A
SUBTOTAL 4,702,066 3,841,976 1,140,000 0 (1,140,000) (100.00%)

ADMINISTRATIVE CONTROL
49002 Advances 0 0 0 0 0 N/A
49003 Advances Clearing 0 0 0 0 0 N/A
SUBTOTAL 0 0 0 0 0 N/A

OTHER FINANCING SOURCES
47101 Transfers In - within a Fund 0 3,620,000 2,320,000 5,078,000 2,758,000 118.88% 47102 Transfers In - btw Govtl Funds 0 0 0 0 0 N/A
SUBTOTAL 0 3,620,000 2,320,000 5,078,000 2,758,000 118.88% TOTAL REVENUES 4,900,326 7,530,319 3,528,343 5,181,245 1,652,902 46.85%

EXPENDITURES

OTHER CHARGES
53103 Interest on LT Debt 0 0 0 0 0 N/A
53104 Other Interest Expense 0 0 0 0 0 N/A
53403 Loss - Disposed Capital Asset 154 0 0 0 0 N/A
SUBTOTAL 154 0 0 0 0 N/A

FIXED ASSETS
19810 Land 0 0 0 0 0 N/A
19812 Acq-CIP-Land 97,054 1,106,626 0 0 0 N/A
19831 CIP - Bldg & Impr 0 0 0 0 0 N/A
19832 CIP - Infrastructure 9,001,265 11,703,835 7,926,200 11,403,800 3,477,600 43.87% 19840 Acq-WIP-Equipment 0 0 0 0 0 N/A
2/29/2024
DRAFT 43
Section Title: Common Facilities
Fund/Department No: 44260 33043200
Actual Estimated Adopted Requested Percent
Account Title 2022-2023 2023-2024 2023-2024 2024-25 Difference Change 19841 Work in Progress - Intang 0 0 0 0 0 N/A
19851 Intangible Assets - Non-amort 0 0 0 0 0 N/A
SUBTOTAL 9,098,320 12,810,461 7,926,200 11,403,800 3,477,600 43.87%

OTHER FINANCING USES
57011 Transfers Out - within a Fund 0 0 0 0 0 N/A
SUBTOTAL 0 0 0 0 0 N/A

ADMINISTRATIVE CONTROL ACCOUNT
59002 Advances 0 0 0 0 0 N/A
59003 Advances Clearing 0 0 0 0 0 N/A
SUBTOTAL 0 0 0 0 0 N/A
TOTAL EXPENDITURES 9,098,474 12,810,461 7,926,200 11,403,800 3,477,600 43.87% Adjustments to Reserves/Encumbrances:

Loan from Petaluma Aqueduct Capital Fund 0 0 0
Technical Adjustments - BRO's 0 0 0
Principal payment on Loan from Petaluma A 0 0 0
Advances 0 0 0
Outstanding Encumbrances - Net Change 4,381,012 0 0
Capitalized Interest 0 0 0
Gain/loss on disposal of Capital Assets 154 0 0
Proceeds from State Loan & Other LT Debt 0 0 0
PY CIP adjustment - reclass to PY Exp (loss 0 0 0
B & I Tsfr to ISF (Facilities) Fund 0 0 0
Auditor Adj - Reversal of Duplicate Pymt 0 0 0
Sale or Purchase of Fixed Asset 0 0 0
Change in Deposit w/Others 0 0 0
Move Project CIP Balance 0 0 0
Change in Contingent Liability 0 0 0
Post Audit Adjustment 6,009,367 0 0
Unrealized Gain/ Loss (GASB 31) (75,567) 0 0
Rounding 1 0 0
ENDING FUND BALANCE 11,595,612 6,315,470 92,915
2/29/2024
DRAFT 44
FY 2024-25 BUDGET

BEGINNING AND ENDING CASH SUMMARY
Section Title: North Marin Water Deposit
Fund/Department No: 44300 33045300
Actual Estimated Adopted Requested Percent
Account Title 2022-2023 2023-2024 2023-2024 2024-25 Difference Change BEGINNING FUND BALANCE 28,094 28,669 29,379

REVENUES

USE OF MONEY / PROPERTY
44002 Interest on Pooled Cash 575 710 710 971 261 36.78% 44050 Unrealized Gains and Losses 38,271 0 0 0 0 N/A
SUBTOTAL 38,846 710 710 971 261 36.78%

INTERGOVERNMENTAL REVENUE
42610 Other Governmental Agencies 52,545 0 0 0 0 N/A
SUBTOTAL 52,545 0 0 0 0 N/A

OTHER FINANCING SOURCES
47101 Transfers In - within a Fund 0 0 0 0 0 N/A
SUBTOTAL 0 0 0 0 0 N/A
TOTAL REVENUES 91,391 710 710 971 261 36.78%

EXPENDITURES

OTHER CHARGES
53501 Contributions 0 0 0 0 0 N/A
SUBTOTAL 0 0 0 0 0 N/A

OTHER FINANCING USES
57011 Transfers Out - within a Fund 0 0 0 0 0 N/A
SUBTOTAL 0 0 0 0 0 N/A
TOTAL EXPENDITURES 0 0 0 0 0 N/A
Adjustments to Reserves/Encumbrances:

Unrealized Gain/ Loss (GASB 31) (38,271) 0
Post Audit Adjustment (52,545) 0
Post Audit Adjustment 0 0
Rounding 0 0
ENDING FUND BALANCE 28,669 29,379 30,349
2/29/2024
DRAFT 45
FY 2024-25 BUDGET

BEGINNING AND ENDING CASH SUMMARY
Section Title: State Loan Debt Service Fund
Fund/Department No: 44265 33047000
Actual Estimated Adopted Requested Percent
Account Title 2022-2023 2023-2024 2023-2024 2024-25 Difference Change BEGINNING FUND BALANCE $638,780 $480,005 $507,581

REVENUES

USE OF MONEY / PROPERTY
44002 Interest on Pooled Cash 25,684 17,189 17,189 10,425 (6,764) (39.35%) 44003 Other Interest Earnings 0 0 0 0 0 N/A
44050 Unrealized Gains and Losses (1,191) 0 0 0 0 N/A
SUBTOTAL 24,493 17,189 17,189 10,425 (6,764) (39.35%)

OTHER FINANCING SOURCES
47101 Transfers In - within a Fund 1,036,374 1,196,268 1,196,268 1,196,267 (1) (0.00%) 47102 Transfers In - btw Govtl Funds 0 0 0 0 0 N/A
SUBTOTAL 1,036,374 1,196,268 1,196,268 1,196,267 (1) (0.00%) TOTAL REVENUES 1,060,867 1,213,457 1,213,457 1,206,692 (6,765) (0.56%)

EXPENDITURES

OTHER CHARGES
53103 Interest on LT Debt 153,354 128,408 128,408 102,759 (25,649) (19.97%) SUBTOTAL 153,354 128,408 128,408 102,759 (25,649) (19.97%)

OTHER FINANCING USES
57011 Transfers Out - within a Fund 120,000 120,000 120,000 558,000 438,000 365.00% SUBTOTAL 120,000 120,000 120,000 558,000 438,000 365.00% ADMIN. CONTROL ACCOUNT
59002 Advances 886,877 911,825 911,825 937,473 25,648 2.81% 59003 Advances Clearing (886,877) (911,825) (911,825) (937,473) (25,648) 2.81% SUBTOTAL 0 0 0 0 0 N/A
TOTAL EXPENDITURES 273,354 248,408 248,408 660,759 412,351 166.00% Adjustments to Reserves/Encumbrances:

Principal payments on loan (947,480) 0
(Increase) / Decrease in Principal Payable 0 (937,473) 0 Advances from Other Govt 1,191 0 0
Unrealized Gain/ Loss (GASB 31) 1 0 0
Rounding 0 0 0
ENDING FUND BALANCE $480,005 $507,581 $1,053,514
2/29/2024
DRAFT 46
FY 2024-25 BUDGET

BEGINNING AND ENDING CASH SUMMARY
Section Title: State Loan Reserve Fund
Fund/Department No: 44270 33047100
Actual Estimated Adopted Requested Percent
Account Title 2022-2023 2023-2024 2023-2024 2024-25 Difference Change BEGINNING FUND BALANCE $0 ($0) ($0)

REVENUES

USE OF MONEY / PROPERTY
44002 Interest on Pooled Cash 0 0 0 (0) (0) N/A
44003 Other Interest Earnings 0 0 0 0 0 N/A
44050 Unrealized Gains and Losses 514 0 0 0 0 N/A
SUBTOTAL 514 0 0 (0) (0) N/A

OTHER FINANCING SOURCES
47101 Transfers In - within a Fund 0 0 0 0 0 N/A
SUBTOTAL 0 0 0 0 0 N/A
TOTAL REVENUES 514 0 0 (0) (0) N/A

EXPENDITURES

OTHER FINANCING USES
57011 Transfers Out - within a Fund 0 0 0 0 0 N/A
SUBTOTAL 0 0 0 0 0 N/A
TOTAL EXPENDITURES 0 0 0 0 0 N/A
Adjustments to Reserves/Encumbrances:

Increase in Reserve 0 0 0
Unrealized Gain/ Loss (GASB 31) (514) 0
Rounding 0 0
ENDING FUND BALANCE ($0) ($0) ($0)
2/29/2024
DRAFT 47
FY 2024-25 BUDGET

BEGINNING AND ENDING CASH SUMMARY
Section Title: Storage Facilities Revenue Bonds 2015
Fund/Department No: 44290 33047500
Actual Estimated Adopted Requested Percent
Account Title 2022-2023 2023-2024 2023-2024 2024-25 Difference Change BEGINNING FUND BALANCE $131,617 ($17,071) $3,880

REVENUES

USE OF MONEY / PROPERTY
44002 Interest on Pooled Cash 4,002 651 651 329 (322) (49.41%) 44003 Other Interest Earnings 1,214 0 0 0 0 N/A
44050 Unrealized Gains and Losses 2,897 0 0 0 0 N/A
SUBTOTAL 8,112 651 651 329 (322) (49.41%)
Miscellaneous Revenues
46200 PY Revenue - Miscellaneous (1,912) 0 0 0 0 N/A
SUBTOTAL (1,912) 0 0 0 0 N/A

OTHER FINANCING SOURCES
47101 Transfers In - within a Fund 409,742 477,198 477,198 476,590 (608) (0.13%) 47102 Transfers In - btw Govtl Funds 0 0 0 0 0 N/A
SUBTOTAL 409,742 477,198 477,198 476,590 (608) (0.13%)
TOTAL REVENUES 415,943 477,849 477,849 476,919 (930) (0.19%)

EXPENDITURES

SERVICES AND SUPPLIES
51242 Bank Charges 1,174 1,500 1,500 1,500 0 0.00%
SUBTOTAL 1,174 1,500 1,500 1,500 0 0.00%

OTHER CHARGES
53103 Interest on LT Debt 157,213 144,521 144,521 131,327 (13,194) (9.13%) 53104 Other Interest Expense (11,468) 5,058 5,058 5,058 0 0.00% 53105 Costs of Issuance 0 0 0 0 0 N/A
53109 Capitalized Interest 0 0 0 0 0 N/A
SUBTOTAL 145,745 149,579 149,579 136,385 (13,194) (8.82%)

OTHER FINANCING USES
57011 Transfers Out - within a Fund 150,000 47,000 117,000 55,000 (62,000) (52.99%) 57012 Transfers Out - btw Govtl Fund 0 0 0 0 0 N/A
SUBTOTAL 150,000 47,000 117,000 55,000 (62,000) (52.99%) ADMIN. CONTROL ACCOUNT
59004 Administrative Control Account 253,852 263,876 263,876 276,541 12,665 4.80% 59005 Admin Control Acct Clearing (253,852) (263,876) (263,876) (276,541) (12,665) 4.80% SUBTOTAL 0 0 0 0 0 N/A
TOTAL EXPENDITURES 296,919 198,079 268,079 192,885 (75,194) (28.05%) Adjustments to Reserves/Encumbrances:

Change in Principal due to Bond Reallocation 0
Change in Bond Premium due to Bond Realloc 0
Capitalized Interest 0
Loss on Refunding of Debt 5,058 5,058 5,058
Principal Payment (253,852) (263,876) (276,541)
Special Fund Stmts'!B449 0 0 0
Amortization of Bond Premium (16,526) 0 0
Change in Reserved Fund Balance 505
Unrealized Gain/ Loss (GASB 31) (2,897)
Rounding 0 (0)
ENDING FUND BALANCE ($17,071) $3,880 $16,431
2/29/2024
DRAFT 48
FY 2024-25 BUDGET

BEGINNING AND ENDING CASH SUMMARY
Section Title: Common Facilities Revenue Bonds 2015
Fund/Department No: 44295 33047600
Actual Estimated Adopted Requested Percent
Account Title 2022-2023 2023-2024 2023-2024 2024-25 Difference Change BEG. FUND BALANCE $351,484 $178,906 $152,068

REVENUES

USE OF MONEY / PROPERTY
44002 Interest on Pooled Cash 10,242 8,381 8,381 3,390 (4,991) (59.55%) 44003 Other Interest Earnings 2,402 0 0 0 0 N/A
44050 Unrealized Gains and Losses 4,732 0 0 0 0 N/A
SUBTOTAL 17,376 8,381 8,381 3,390 (4,991) (59.55%)

MISCELLANEOUS REVENUES
46200 PY Revenue - Miscellaneous (1,707) 0 0 0 0 N/A
SUBTOTAL (1,707) 0 0 0 0 N/A

OTHER FINANCING SOURCES
47101 Transfers In - within a Fund 1,060,904 1,228,700 1,228,700 1,228,157 (543) (0.04%) 47102 Transfers In - btw Govtl Funds 0 0 0 0 0 N/A
SUBTOTAL 1,060,904 1,228,700 1,228,700 1,228,157 (543) (0.04%) TOTAL REVENUES 1,076,573 1,237,082 1,237,082 1,231,548 (5,534) (0.45%)

EXPENDITURES

SERVICES AND SUPPLIES
51242 Bank Charges 2,075 2,500 2,500 2,500 0 0.00%
SUBTOTAL 2,075 2,500 2,500 2,500 0 0.00%

OTHER CHARGES
53103 Interest on LT Debt 454,460 424,044 424,044 392,175 (31,869) (7.52%) 53104 Other Interest Expense (25,008) 4,516 4,516 4,516 0 0.00% 53105 Costs of Issuance 0 0 0 0 0 N/A
53109 Capitalized Interest 0 0 0 0 0 N/A
SUBTOTAL 429,452 428,560 428,560 396,691 (31,869) (7.44%)

OTHER FINANCING USES
57011 Transfers Out - within a Fund 180,000 200,000 200,000 260,000 60,000 30.00% 57012 Transfers Out - btw Govtl Fund 0 0 0 0 0 N/A
SUBTOTAL 180,000 200,000 200,000 260,000 60,000 30.00%
ADMIN. CONTROL ACCOUNT
59004 Administrative Control Account 608,336 637,375 637,375 668,772 31,397 4.93% 59005 Admin Control Acct Clearing (608,336) (637,375) (637,375) (668,772) (31,397) 4.93% SUBTOTAL 0 0 0 0 0 N/A
TOTAL EXPENDITURES 611,527 631,060 631,060 659,191 28,131 4.46% Adjustments to Reserves/Encumbrances:

Principal Payment (608,336) (637,374) (668,772)
Change in Principal due to Bond Reallocat 0 0 0
Change in Bond Premium due to Bond Rea 0 0 0
Revenue Bonds Pay - Change in Current B 0 0 0
Amortization of Bond Premium (29,523) 0 0
Capitalized Interest 0
Change in Reserved Fund Balance 451
Loss on Refunding Debt 4,515 4,515 0
Unrealized Gain/ Loss (GASB 31) (4,732) 0 0
Rounding 1 0 0
ENDING FUND BALANCE $178,906 $152,068 $55,653
2/29/2024
DRAFT 49
FY 2024-25 BUDGET

BEGINNING AND ENDING CASH SUMMARY
Section Title: Sonoma Aqueduct Revenue Bonds 2015
Fund/Department No: 44305 33047700
Actual Estimated Adopted Requested Percent
Account Title 2022-2023 2023-2024 2023-2024 2024-25 Difference Change BEGINNING FUND BALANCE $102,582 $24,686 $5,877

REVENUES

USE OF MONEY / PROPERTY
44002 Interest on Pooled Cash 1,857 1,238 1,238 193 (1,045) (84.41%) 44003 Other Interest Earnings 73 0 0 0 0 N/A
44050 Unrealized Gains and Losses (180) 0 0 0 0 N/A
SUBTOTAL 1,750 1,238 1,238 193 (1,045) (84.41%)

MISCELLANEOUS REVENUES
46200 PY Revenue - Miscellaneous 0 0 0 0 0 N/A
SUBTOTAL 0 0 0 0 0 N/A

OTHER FINANCING SOURCES
47101 Transfers In - within a Fund 17,970 37,971 37,971 37,971 0 0.00% 47102 Transfers In - btw Govtl Funds 0 0 0 0 0 N/A
SUBTOTAL 17,970 37,971 37,971 37,971 0 0.00%
TOTAL REVENUES 19,720 39,209 39,209 38,164 (1,045) (2.66%)

EXPENDITURES

SERVICES AND SUPPLIES
51242 Bank Charges 325 500 500 500 0 0.00%
SUBTOTAL 325 500 500 500 0 0.00%

OTHER CHARGES
53103 Interest on LT Debt 14,658 13,768 13,768 12,830 (938) (6.81%) 53104 Other Interest Expense (689) 0 0 0 0 N/A
53105 Costs of Issuance 0 0 0 0 0 N/A
SUBTOTAL 13,969 13,768 13,768 12,830 (938) (6.81%)

OTHER FINANCING USES
57011 Transfers Out - within a Fund 65,000 25,000 45,000 5,000 (40,000) (88.89%) SUBTOTAL 65,000 25,000 45,000 5,000 (40,000) (88.89%)
ADMIN. CONTROL ACCOUNT
59004 Administrative Control Account 17,813 18,750 18,750 19,688 938 5.00% 59005 Admin Control Acct Clearing (17,813) (18,750) (18,750) (19,688) (938) 5.00% SUBTOTAL 0 0 0 0 0 N/A
TOTAL EXPENDITURES 79,293 39,268 59,268 18,330 (40,938) (69.07%) Adjustments to Reserves/Encumbrances:

Change in Principal due to Bond Reallocation 0 0 0
Change in Bond Premium due to Bond Reallo 0 0 0
Accrual of Principal Payment - Revenue Bond (17,813) (18,750) (19,688) Principal Payment 0 0 0
Amortization of Bond Premium (689) 0 0
Unrealized Gain/ Loss (GASB 31) 180 0 0
Change in Reserved Fund Balance 0
Rounding (1) 0 0
ENDING FUND BALANCE $24,686 $5,877 $6,022
2/29/2024
DRAFT 50
FY 2024-25 BUDGET

BEGINNING AND ENDING CASH SUMMARY
Section Title: Common Facilities Revenue Bonds 2019
Fund/Department No: 44310 33047800
Actual Estimated Adopted Requested Percent
Account Title 2022-2023 2023-2024 2023-2024 2024-25 Difference Change BEG. FUND BALANCE $41,116 $631,233 $738,396

REVENUES

USE OF MONEY / PROPERTY
44002 Interest on Pooled Cash 11,754 18,860 18,860 12,852 (6,008) (31.85%) 44003 Other Interest Earnings 1,433 0 0 0 0 N/A
44050 Unrealized Gains and Losses (17,802) 0 0 0 0 N/A
SUBTOTAL (4,615) 18,860 18,860 12,852 (6,008) (31.85%)

MISCELLANEOUS REVENUES
46200 PY Revenue - Miscellaneous (1,429) 0 0 0 0 N/A
0 0 0 0 0 N/A
(1,429) 0 0 0 0 N/A

OTHER FINANCING SOURCES
47101 Transfers In - within a Fund 585,997 676,992 676,992 676,356 (636) (0.09%) 47102 Transfers In - btw Govtl Funds 0 0 0 0 0 N/A
SUBTOTAL 585,997 676,992 676,992 676,356 (636) (0.09%)
TOTAL REVENUES 579,954 695,852 695,852 689,208 (6,644) (0.95%)

EXPENDITURES

SERVICES AND SUPPLIES
51242 Bank Charges 2,675 3,000 3,000 3,000 0 0.00%
SUBTOTAL 2,675 3,000 3,000 3,000 0 0.00%

OTHER CHARGES
53103 Interest on LT Debt 293,933 279,355 279,355 264,038 (15,317) (5.48%) 53104 Other Interest Expense (54,724) 0 0 0 0 N/A
53105 Costs of Issuance 0 0 0 0 0 N/A
SUBTOTAL 239,209 279,355 279,355 264,038 (15,317) (5.48%)

OTHER FINANCING USES
57011 Transfers Out - within a Fund 0 0 0 800,000 800,000 N/A 57012 Transfers Out - btw Govtl Fund 0 0 0 0 0 N/A
SUBTOTAL 0 0 0 800,000 800,000 N/A
ADMIN. CONTROL ACCOUNT
59004 Administrative Control Account 291,571 306,334 306,334 321,098 14,764 4.82% 59005 Admin Control Acct Clearing (291,571) (306,334) (306,334) (321,098) (14,764) 4.82% SUBTOTAL 0 0 0 0 0 N/A
TOTAL EXPENDITURES 241,884 282,355 282,355 1,067,038 784,683 277.91% Adjustments to Reserves/Encumbrances:

Principal Payment (291,571) (306,334) (321,098)
Amortization of Bond Premium (54,724) 0 0
Unrealized Gain/ Loss (GASB 31) 17,802 0 0
Changed in Reserved Fund Balance 580,541 0 0
Rounding (1) 0 0
ENDING FUND BALANCE $631,233 $738,396 $39,468
2/29/2024
DRAFT 51
FY 2024-25 BUDGET

BEGINNING AND ENDING CASH SUMMARY
Section Title: Sonoma Aqueduct Revenue Bonds 2019
Fund/Department No: 44315 33047900
Actual Estimated Adopted Requested Percent
Account Title 2022-2023 2023-2024 2023-2024 2024-25 Difference Change BEGINNING FUND BALANCE $124,939 $216,915 $165,767

REVENUES

USE OF MONEY / PROPERTY
44002 Interest on Pooled Cash 6,035 7,463 7,463 6,389 (1,073) (14.38%) 44003 Other Interest Earnings 508 0 0 0 0 N/A
44050 Unrealized Gains and Losses (1,263) 0 0 0 0 N/A
SUBTOTAL 5,280 7,463 7,463 6,389 (1,073) (14.38%)

MISCELLANEOUS REVENUES
46200 PY Revenue - Miscellaneous (507) 0 0 0 0 N/A
(507) 0 0 0 (1,073) N/A

OTHER FINANCING SOURCES
47101 Transfers In - within a Fund 178,914 240,651 240,651 240,426 (225) (0.09%) 47102 Transfers In - btw Govtl Funds 0 0 0 0 0 N/A
SUBTOTAL 178,914 240,651 240,651 240,426 (225) (0.09%)
TOTAL REVENUES 183,687 248,114 248,114 246,815 (2,372) (0.96%)

EXPENDITURES

SERVICES AND SUPPLIES
51242 Bank Charges 1,213 1,500 1,500 1,500 0 0.00%
SUBTOTAL 1,213 1,500 1,500 1,500 0 0.00%

OTHER CHARGES
53103 Interest on LT Debt 104,267 99,096 99,096 93,663 (5,433) (5.48%) 53104 Other Interest Expense (19,412) 0 0 0 0 N/A
53105 Costs of Issuance 0 0 0 0 0 N/A
SUBTOTAL 84,855 99,096 99,096 93,663 (5,433) (5.48%)

OTHER FINANCING USES
57011 Transfers Out - within a Fund 90,000 90,000 90,000 90,000 0 0.00% SUBTOTAL 90,000 90,000 90,000 90,000 0 0.00%
ADMIN. CONTROL ACCOUNT
59004 Administrative Control Account 103,429 108,666 108,666 113,903 5,237 4.82% 59005 Admin Control Acct Clearing (103,429) (108,666) (108,666) (113,903) (5,237) 4.82% SUBTOTAL 0 0 0 0 0 N/A
TOTAL EXPENDITURES 176,068 190,596 190,596 185,163 (5,433) (2.85%) Adjustments to Reserves/Encumbrances:

Unrealized Gains and Losses 0 0 0
Proceeds Bond Issuance 0 0 0
Restricted Cash w/Fiscal Agent 0 0 0
Accrual of Principal Payment - Revenue Bon (103,429) (108,666) 0 Principal Payment 0 0 0
Deposit to Cost of Issuance Fund 0 0 0
Bond Premium - Issuance of Revenue Bonds 0 0 0
Amortization of Bond Premium (19,412) 0 0
Unrealized Gain/ Loss (GASB 31) 1,263 0 0
Change in Reserved Fund Balance 205,935 0 0
Rounding (1) 0 0
ENDING FUND BALANCE $216,915 $165,767 $227,419
2/29/2024
DRAFT 52
FY 2024-25 BUDGET

BEGINNING AND ENDING CASH SUMMARY
Section Title: Storage Facilities Revenue Bonds 2022
Fund/Department No: 44325 33048100
Actual Estimated Adopted Requested Percent
Account Title 2022-2023 2023-2024 2023-2024 2024-25 Difference Change BEG. FUND BALANCE $947,409 ($10,443) $15,778

REVENUES

USE OF MONEY / PROPERTY
44002 Interest on Pooled Cash 15,240 2,915 2,915 1,200 (1,716) (58.85%) 44003 Other Interest Earnings 1,171 0 0 0 0 N/A
44050 Unrealized Gains and Losses 12,441 0 0 0 0 N/A
SUBTOTAL 28,852 2,915 2,915 1,200 (1,716) (58.85%)

MISCELLANEOUS REVENUES
46200 PY Revenue - Miscellaneous (1,125) 0 0 0 0 N/A
SUBTOTAL (1,125) 0 0 0 0 N/A
OTHER FINANCING SOURCES (1,125)
47101 Transfers In - within a Fund 310,518 355,015 355,015 455,967 100,952 28.44% 47102 Transfers In - btw Govtl Funds 0 0 0 0 0 N/A
SUBTOTAL 310,518 355,015 355,015 455,967 100,952 28.44%

SPECIAL ITEMS
48004 Residual Equity Transfers 0 0 0 0 0 N/A
SUBTOTAL 0 0 0 0 0 N/A
TOTAL REVENUES 338,246 357,930 357,930 457,167 99,236 27.72%

EXPENDITURES

SERVICES AND SUPPLIES
51242 Bank Charges 270 560 560 1,000 440 78.57%
SUBTOTAL 270 560 560 1,000 440 78.57%

OTHER CHARGES
53103 Interest on LT Debt 133,917 119,587 119,587 165,680 46,093 38.54% 53104 Other Interest Expense (32,639) 0 0 0 0 N/A
53105 Costs of Issuance 0 0 0 0 0 N/A
SUBTOTAL 101,277 119,587 119,587 165,680 46,093 38.54%

SPECIAL ITEMS
56030 Residual Equity Transfers 0 0 0 0 0 N/A
SUBTOTAL 0 0 0 0 0 N/A

OTHER FINANCING USES
57011 Transfers Out - within a Fund 970,000 238,000 288,000 1,232,000 944,000 327.78% 57012 Transfers Out - btw Govtl Fund 0 0 0 0 0 N/A
SUBTOTAL 970,000 238,000 288,000 1,232,000 944,000 327.78% ADMIN. CONTROL ACCOUNT
59004 Administrative Control Account 179,471 188,562 188,562 229,813 41,251 21.88% 59005 Admin Control Acct Clearing (179,471) (188,562) (188,562) (229,813) (41,251) 21.88% SUBTOTAL 0 0 0 0 0 N/A
TOTAL EXPENDITURES 1,071,547 358,147 408,147 1,398,680 990,533 242.69% Adjustments to Reserves/Encumbrances:

Gain on Refunding (4,913) 0 0
Amortization of Bond Premium (27,727)
Proceeds from Bond Issuance 0 215,000 1,225,000
Accrual of Principal Payment - Revenue Bon (179,471) (188,562) (229,813) Unrealized Gain/ Loss (GASB 31) (12,441) 0 0
Rounding 1 0 0
ENDING FUND BALANCE ($10,443) $15,778 $69,452
2/29/2024
DRAFT 53
FY 2024-25 BUDGET

BEGINNING AND ENDING CASH SUMMARY
Section Title: Common Facilities Revenue Bonds 2022
Fund/Department No: 44335 33048300
Actual Estimated Adopted Requested Percent
Account Title 2022-2023 2023-2024 2023-2024 2024-25 Difference Change BEG. FUND BALANCE $13,985,191 $8,405,605 $5,281,441

REVENUES

USE OF MONEY / PROPERTY
44002 Interest on Pooled Cash 231,875 210,969 210,969 116,082 (94,886) (44.98%) 44003 Other Interest Earnings 6,758 0 0 0 0 N/A
44050 Unrealized Gains and Losses 41,730 0 0 0 0 N/A
SUBTOTAL 280,364 210,969 210,969 116,082 (94,886) (44.98%)

MISCELLANEOUS REVENUES
46200 PY Revenue - Miscellaneous (6,486) 0 0 0 0 N/A
SUBTOTAL (6,486) 0 0 0 0 N/A

OTHER FINANCING SOURCES
47101 Transfers In - within a Fund 1,207,898 1,378,983 1,378,983 1,280,562 (98,422) (7.14%) 47102 Transfers In - btw Govtl Funds 0 0 0 0 0 N/A
SUBTOTAL 1,207,898 1,378,983 1,378,983 1,280,562 (98,422) (7.14%)

SPECIAL ITEMS
48004 Residual Equity Transfers 0 0 0 0 0 N/A
SUBTOTAL 0 0 0 0 0 N/A
TOTAL REVENUES 1,481,775 1,589,952 1,589,952 1,396,644 (193,308) (12.16%)

EXPENDITURES

SERVICES AND SUPPLIES
51242 Bank Charges 278 4,000 4,000 3,000 (1,000) (25.00%) SUBTOTAL 278 4,000 4,000 3,000 (1,000) (25.00%)

OTHER CHARGES
53103 Interest on LT Debt 720,251 666,486 666,486 584,533 (81,953) (12.30%) 53104 Other Interest Expense (86,634) 0 0 0 0 N/A
53105 Costs of Issuance 0 0 0 0 0 N/A
SUBTOTAL 633,617 666,486 666,486 584,533 (81,953) (12.30%)

SPECIAL ITEMS
56030 Residual Equity Transfers 0 0 0 0 0 N/A
SUBTOTAL 0 0 0 0 0 N/A

OTHER FINANCING USES
57011 Transfers Out - within a Fund 5,800,000 3,300,000 2,000,000 3,460,000 1,460,000 73.00% 57012 Transfers Out - btw Govtl Fund 0 0 0 0 0 N/A
SUBTOTAL 5,800,000 3,300,000 2,000,000 3,460,000 1,460,000 73.00% ADMIN. CONTROL ACCOUNT
59004 Administrative Control Account 499,101 528,630 528,630 525,999 (2,631) (0.50%) 59005 Admin Control Acct Clearing (499,101) (528,630) (528,630) (525,999) 2,631 (0.50%) SUBTOTAL 0 0 0 0 0 N/A
TOTAL EXPENDITURES 6,433,895 3,970,486 2,670,486 4,047,533 1,377,047 51.57% Adjustments to Reserves/Encumbrances:

Proceeds Bond Issuance 0 (215,000) (1,225,000)
Gain on Refunding (6,879) 0 0
Accrual of Principal Payment - Revenue Bond (499,101)
Principal Payment 0 (528,630) (525,999)
Amortization of Bond Premium (79,755) 0 0
Unrealized Gain/ Loss (GASB 31) (41,730) 0 0
Rounding (1) 0 0
ENDING FUND BALANCE $8,405,605 $5,281,441 $879,554
2/29/2024
DRAFT 54
FY 2024-25 BUDGET

BEGINNING AND ENDING CASH SUMMARY
Section Title: Sonoma Aqueduct Revenue Bonds 2022
Fund/Department No: 44330 33048200
Actual Estimated Adopted Requested Percent
Account Title 2022-2023 2023-2024 2023-2024 2024-25 Difference Change BEGINNING FUND BALANCE ($1,287) $3,851 $36,018

REVENUES

USE OF MONEY / PROPERTY
44002 Interest on Pooled Cash (436) 1,576 1,576 1,678 102 6.47% 44003 Other Interest Earnings 629 0 0 0 0 N/A
44050 Unrealized Gains and Losses 7,059 0 0 0 0 N/A
SUBTOTAL 7,252 1,576 1,576 1,678 102 6.47%
MISCELLANEOUS REVENUES 0 0 0 0 0 N/A
46200 PY Revenue - Miscellaneous (604) 0 0 0 0 N/A
SUBTOTAL (604) 0 0 0 0 N/A

OTHER FINANCING SOURCES
47101 Transfers In - within a Fund 212,610 234,526 234,526 233,940 (587) (0.25%) 47102 Transfers In - btw Govtl Funds 0 0 0 0 0 N/A
SUBTOTAL 212,610 234,526 234,526 233,940 (587) (0.25%)

SPECIAL ITEMS
48004 Residual Equity Transfers 0 0 0 0 0 N/A
SUBTOTAL 0 0 0 0 0 N/A
TOTAL REVENUES 219,259 236,103 236,103 235,618 (484) (0.21%)

EXPENDITURES

SERVICES AND SUPPLIES
51242 Bank Charges 270 350 350 350 0 0.00%
SUBTOTAL 270 350 350 350 0 0.00%

OTHER CHARGES
53103 Interest on LT Debt 75,364 65,778 65,778 58,888 (6,890) (10.47%) 53104 Other Interest Expense (24,172) 0 0 0 0 N/A
53105 Costs of Issuance 0 0 0 0 0 N/A
SUBTOTAL 51,192 65,778 65,778 58,888 (6,890) (10.47%)

SPECIAL ITEMS
56030 Residual Equity Transfers 0 0 0 0 0 N/A
SUBTOTAL 0 0 0 0 0 N/A

OTHER FINANCING USES
57011 Transfers Out - within a Fund 0 0 0 0 0 N/A
SUBTOTAL 0 0 0 0 0 N/A
ADMIN. CONTROL ACCOUNT
59004 Administrative Control Account 131,428 137,808 137,808 144,188 6,380 4.63% 59005 Admin Control Acct Clearing (131,428) (137,808) (137,808) (144,188) (6,380) 4.63% SUBTOTAL 0 0 0 0 0 N/A
TOTAL EXPENDITURES 51,462 66,128 66,128 59,238 (6,890) (10.42%) Adjustments to Reserves/Encumbrances:

Gain on Refunding (4,040) 0 0
Accrual of Principal Payment - Revenue Bon (131,428) (137,808) 0 Principal Payment 0 0 (144,188)
Amortization of Bond Premium (20,132) 0 0
Unrealized Gain/ Loss (GASB 31) (7,059) 0 0
Rounding 0 0 0
ENDING FUND BALANCE $3,851 $36,018 $68,210
2/29/2024
DRAFT 55
A. ANNUAL DEBT SERVICE REQUIREMENTS
Sonoma
Common O&M Water Storage Pipeline
Facilities Fund Conservation Facilities Facilities
2012 A Revenue Bond 44275 TBD TBD 44280 44285
PRINCIPAL 0 0 0
INTEREST 0 0 0
OTHER INTEREST - DEFERRED REFUNDING CHARGE 0 0 0
FISCAL AGENT FEES 0 0 0

DEBT ISSUANCE COSTS
Total Individual Bond Payments 0 0 0 0
Bond Reserve 0 0 0 0
Total Individual Bond Debt Service 0 0 0 0
2015A Revenue Bond 44295 44290 44305
PRINCIPAL 668,772 276,541 19,688
INTEREST 392,175 131,327 12,830
OTHER INTEREST - DEFERRED REFUNDING CHARGE 4,516 5,058 0 FISCAL AGENT FEES 2,500 1,500 500
Total Individual Bond Payments 1,067,963 414,426 33,018 Bond Reserve 160,194 62,164 4,953
Total Individual Bond Debt Service 1,228,157 476,590 37,971 2019A Revenue Bond 44310 44320 44315
PRINCIPAL 321,098 113,903
INTEREST 264,038 93,663
FISCAL AGENT FEES 3,000 1,500

DEBT ISSUANCE COSTS
Total Individual Bond Payments 588,136 0 209,066
Bond Reserve 88,220 0 31,360
Total Individual Bond Debt Service 676,356 0 240,426
2022A Revenue Bond 44335 44325 44330
PRINCIPAL 525,999 229,813 144,188
INTEREST 584,533 165,680 58,888
FISCAL AGENT FEES 3,000 1,000 350
DEBT ISSUANCE COSTS 0
Total Individual Bond Payments 1,113,532 396,493 203,426 Bond Reserve 167,029.80 59,474 30,514
Total Individual Bond Debt Service 1,280,562 455,967 233,940 SRF LOAN 44265
PRINCIPAL 937,473 N.A N.A
INTEREST 102,759 N.A N.A
Total Individual Loan Payments 1,040,232
Reserve Requirement 156,035
Total SRF Debt Service 1,196,267

SRF LOAN RESERVE
RESERVE N.A N.A
Total SRF Debt Service 1,196,267
TOTAL DEBT SERVICE $4,381,342 $0 $0 $932,557 $512,337
492,184
$3,889,158 $0 $0 $932,557 $512,337
REVENUE BOND / STATE LOAN CHARGES - WATER RATES AND ESTIMATED REVENUES FOR FY24-25 LESS REV. FROM N. MARIN REV. BOND CHARGES

REMAINING REVENUE REQUIREMENT
DRAFT 56
A. ANNUAL DEBT SERVICE REQUIREMENTS
Sonoma
Common O&M Water Storage Pipeline
Facilities Fund Conservation Facilities Facilities
REVENUE BOND / STATE LOAN CHARGES - WATER RATES AND ESTIMATED REVENUES FOR FY24-25 B. CALCULATIONS OF WATER RATES FOR FY24-25
Sonoma
Common O&M Water Storage Pipeline
Facilities Fund Conservation Facilities Facilities
Debt Service Debt Service Debt Service Revenue Bonds Revenue Bonds Charge Charge Charge Charge Charge
REVENUE REQUIREMENT $3,889,158.03 $0 $0 $932,557 $512,337 APPLICABLE BASE WATER DELIVERIES IN A.F. 29,637.18 42,778.6 42,778.6 29,637.18 3,521.4 CHARGES PER ACRE-FEET $131.22 $0.00 $0.00 $31.47 $145.49 C. CALCULATIONS OF NORTH MARIN REVENUE BONDS CHARGE
$1,939,004
240,231
5,436

44.19 1,851,038
251,954
5,436

46.35 Remaining Facilities: SRF Loan, 2015A Revenue Bond Refunding, 2022 Revenue Bond Refunding Additional Facilities: 2015A Revenue Bond New Money, 2022 Revenue Bond New Money Excluded: 2019A Revenue Bond - NMWD Paid Cash
Principal Interest
Reserve
Requirement
Fiscal Agent Fee
+ Other Charges Total
SRF LOAN 937,473 102,759 156,035 1,196,267
2015A Revenue Bond 637,375 424,044 160,194 7,016 1,228,629 2015A Revenue Bond New Money 439,277 322,539 114,977 5,036 881,829 2015A Revenue Bond Refunding 198,098 101,505 45,217 1,980 346,801 2019A Revenue Bond 321,098 264,038 88,220 3,000 676,356 2022A Revenue Bond 528,630 666,486 167,030 3,000 1,365,146 2022A Revenue Bond New Money 294,000 554,493 118,586 2,130 969,209 2022A Revenue Bond Refunding 234,630 111,992 48,444 870 395,937 N. MARIN'S SHARE (REV. REQMT. FOR COMMON FAC. DEBT SERVICE X (11.2/90.4)) ESTIMATED WATER DELIVERIES TO NORTH MARIN (IN A.F.)

NORTH MARIN REVENUE BONDS CHARGE
REVENUE REQUIREMENT FOR COMMON FACILITIES DEBT SERVICE (Remaining Facilities per RA 4.3a2 ) FY23/24
REVENUE REQUIREMENT FOR COMMON FACILITIES DEBT SERVICE (Additional Facilities per RA 4.3b9 ) N. MARIN'S SHARE (REV. REQMT. FOR COMMON FAC. DEBT SERVICE X (19.9/146.2)) ESTIMATED WATER DELIVERIES TO NORTH MARIN (IN A.F.)

NORTH MARIN REVENUE BONDS CHARGE
DRAFT 57
Fund Index OT Out (57012) To OT In (47102) Fund Bal. (Stmt.) Fund Bal. (Cash) Diff.

Santa Rosa Aq. Capital Fund 44230 0 299,408 9,970,803 9,970,803 (0) Petaluma Aq. Capital Fund 44235 0 0 1,854,903 1,854,903 0 Sonoma Aq. Capital Fund 44240 0 211,752 69,051 69,051 0 Sonoma Rev Bond 2015 Fund 44305 5,000 Sonoma AQ 37,971 6,022 6,022 0 Sonoma Rev Bond 2019 Fund 44315 90,000 Sonoma AQ 240,426 227,419 227,419 0 Sonoma Rev Bond 2022 Fund 44330 0 Sonoma AQ 233,940 68,210 68,210 0 Storage Rev Bond 2015 Fund 44290 55,000 Storage Facilities 476,590 16,432 16,431 (0) Storage Rev Bond 2022 Fund 44325 1,232,000 Storage Facilities 455,967 69,452 69,452 0 Common Rev Bond 2015 Fund 44295 260,000 Common Facilities 1,228,157 55,653 55,653 0 Common Rev Bond 2019 Fund 44310 800,000 Common Facilities 676,356 39,468 39,468 0 Common Rev Bond 2022 Fund 44335 3,460,000 Common Facilities 1,280,562 879,554 879,554 0 State Loan Debt Service 44265 558,000 Common Facilities 1,196,267 1,053,514 1,053,514 0 State Loan Reserve 44270 0 0 (0) (0) 0
Capital Lease Financing 0 0 0 0 0
Agency Fund (Discretionary) 44205 0 Common Facilities 0 9,107,984 9,107,984 0 Agency Fund (Charges) 44205 10,522,486 0
Pipeline Facilities 44255 0 0 0 0
Storage Facilities 44250 1,287,000 44,236 44,236 0
Common Facilities 44260 5,078,000 92,915 92,915 (1)
North Marin 44300 0 0 30,349 30,349 0
Water Management Planning 44210 15,000 164,638 164,638 0 Watershed Planning/Restoration 44215 1,714,950 2,918,550 2,918,550 0 Recycled Water & Local Supply 44220 0 242,321 242,321 0 Water Conservation 44225 2,550,140 45,627 45,627 0
Total 16,982,486 16,982,486 26,956,933 26,956,933 0
Common Facilities OT - in 47101 From
Water Transmission (discretionary) -
Water Transmission (Charges) -
North Marin - O&M Rate Computation
2012 Bond Fund - Revenue Requirement - Transfers Out:
2015 Bond Fund 260,000 10,522,486
2019 Bond Fund 800,000
2022 Bond Fund 3,460,000
State Loan Debt Service 558,000
5,078,000
Agency Fund (Charges) OT - Out To:

AQ Capital Funds Summary
Santa Rosa Aq. Capital Fund 299,408
Petaluma Aq. Capital Fund 0 AQ Capital Funds 416,160
Sonoma Aq. Capital Fund 116,752 Debt Service Funds 5,826,236 416,160 WT Subfunds 4,280,090
Debt Service Funds 10,522,486
Sonoma Rev Bond 2012 Fund 0
Sonoma Rev Bond 2015 Fund 37,971 Capital Funds and North Marin 0 Sonoma Rev Bond 2019 Fund 240,426
Sonoma Rev Bond 2022 Fund 233,940
Storage Rev Bond 2012 Fund 0 Total 10,522,486
Storage Rev Bond 2015 Fund 476,590
Storage Rev Bond 2022 Fund 455,967
Common Rev Bond 2012 Fund 0
Common Rev Bond 2015 Fund 1,228,157
Common Rev Bond 2019 Fund 676,356
Common Rev Bond 2022 Fund 1,280,562
State Loan Debt Service 1,196,267
State Loan Reserve 0
Capital Lease Financing 0
5,826,236
Capital Funds and North Marin
Pipeline Facilities 0
Storage Facilities 0
Common Facilities 0
North Marin 0
0 WT Subfunds
Water Management Planning 15,000
Watershed Planning/Restoration 1,714,950
Recycled Water & Local Supply 0
Water Conservation 2,550,140
4,280,090
Total 10,522,486
Agency Fund (Charges) OT - Out To:

FY 2024-25 BUDGET
Water Transmission System - Fund Balances and Operating Transfers 2/29/2024