Bidders:

Item
Number Item Description Quantity
Unit of
Measurement
Price Per Unit Total Price Price Per Unit Total Price
1 Mobilization 1 LS $145,000.00 $145,000.00 $30,000.00 $30,000.00 2 Traffic Control and Construction Area
Signs
1 LS $190,000.00 $190,000.00 $35,000.00 $35,000.00
3 Storm Water Pollution Prevention 1 LS $45,000.00 $45,000.00 $12,000.00 $12,000.00 4 Remove Concrete Curb & Gutter 95 LF $80.00 $7,600.00 $25.00 $2,375.00 5 Remove Concrete Sidewalk 692 SF $20.00 $13,840.00 $15.00 $10,380.00 6 Remove Concrete Driveway 185 SF $20.00 $3,700.00 $25.00 $4,625.00 7 Remove AC 5770 SF $9.00 $51,930.00 $4.00 $23,080.00
8 Remove AC Berm 32 LF $20.00 $640.00 $25.00 $800.00
9 Remove Brick 52 SF $22.00 $1,144.00 $25.00 $1,300.00
10 Remove Landscape Area 14,495 SF $2.20 $31,889.00 $3.00 $43,485.00 11 Remove Wooden Barricade 2 EA $530.00 $1,060.00 $500.00 $1,000.00 12 Remove 12" Storm Drain Pipe 25 LF $76.00 $1,900.00 $300.00 $7,500.00 13 Remove 18" Storm Drain Pipe 80 LF $40.00 $3,200.00 $200.00 $16,000.00 14 Install PCC Curb & Gutter 263 LF $220.00 $57,860.00 $100.00 $26,300.00 15 Install PCC Sidewalk 2,015 SF $43.00 $86,645.00 $30.00 $60,450.00 16 Install PCC Curb Ramp 130 SF $220.00 $28,600.00 $40.00 $5,200.00 17 Install PCC Driveway 185 SF $51.00 $9,435.00 $40.00 $7,400.00 18 Install Extruded Concrete Curb 525 LF $64.00 $33,600.00 $100.00 $52,500.00 19 Install Stabilized Decomposed Granite
Path 6,365 SF $53.00 $337,345.00 $12.00 $76,380.00
20 Aggregate Base (Along Stabilized
Decomposed Granite Path) 125 CY $250.00 $31,250.00 $150.00 $18,750.00 21 Asphalt Concrete 84 TN $1,335.00 $112,140.00 $500.00 $46,200.00 22 Segmental Retaining Wall 530 LF $256.00 $135,680.00 $80.00 $42,400.00

SIDEWALK GAP CLOSURE PROJECT
City of Cotati Bid Opening Date 08/27/2024
Engineer's Estimate: $700,700
Ghilotti Bros., Inc Zara Construction
23 Install Landscape In-Kind at New
Grade 5,055 SF $7.00 $35,385.00 $7.00 $35,385.00
24 Speed Hump1 EA $2,500.00 $2,500.00 $1,000.00 $1,000.00 25 Relocate Mailbox In-Kind. Install New
Post & Assembly
9 EA $1,200.00 $10,800.00 $1,500.00 $13,500.00
26 Relocate Sign & Post3 EA $745.00 $2,235.00 $800.00 $2,400.00 27 Project Funding Board (City Furnished
& Contractor Installed)
3 EA $1,700.00 $5,100.00 $1,800.00 $5,400.00
28 Adjust to Grade Storm Drain Box1 EA $2,290.00 $2,290.00 $4,000.00 $4,000.00 29 Adjust to Grade Water Meter, Box, &
Cover
6 EA $215.00 $1,290.00 $1,500.00 $9,000.00
30 Adjust to Grade Utility Vault1 EA $600.00 $600.00 $1,800.00 $1,800.00 31 Relocate Utility Cabinet1 EA $30,700.00 $30,700.00 $8,000.00 $8,000.00 32 Relocate Backflow Preventer1 EA $3,900.00 $3,900.00 $3,000.00 $3,000.00 33 Area Drain With Open Grate1 EA $6,600.00 $6,600.00 $12,000.00 $12,000.00 34 Install 12" Diameter RCP Pipe 38 LF $235.00 $8,930.00 $550.00 $20,900.00 35 Install 18" Diameter RCP Pipe 80 LF $240.00 $19,200.00 $600.00 $48,000.00 Total Base Bid: $1,458,988.00 $687,510.00