Water Transmission FY 2025/2026 Draft Budget and Rates Agenda Item 4 Sonoma Water
Sonoma Water is a wholesale water supplier to nine cities and water districts that serve more than 600,000 residents in portions of Sonoma and Marin counties. The Russian River provides most of Sonoma Water's water supply with groundwater supply from the Santa Rosa Plain as a secondary source.

Under agreements with the U.S. Army Corps of Engineers, Sonoma Water manages the water supply storage in Lake Mendocino and Lake Sonoma to provide a reliable water supply and maintain minimum instream flow requirements for fish and wildlife protection and recreation in the Russian River and Dry Creek. Sonoma Water holds water-right permits issued by the State Water Resources Control Board that authorize Sonoma Water to store up to 122,500 acre-feet per year of water in Lake Mendocino and up to 245,000 acre-feet/year of water in Lake Sonoma.

The primary points of Sonoma Water's diversion facilities near Forestville include six radial collector wells that extract Russian River underflow that has been filtered through approximately 100 feet of natural sand and gravel. This highly efficient, natural filtration process, with chlorination treatment, produces high-quality, potable water. This water is then fed directly into Sonoma Water's aqueduct system.

The Water Transmission System extends from Sonoma Water's Russian River diversion facilities located near Forestville to the Santa Rosa, Petaluma, and Sonoma valleys. The Water Transmission System consists of over 85 miles of pipelines, seven booster-pump stations, and 18 storage tanks with a combined storage capacity of 128.8 million gallons. The major pipelines that comprise the system and range in diameter from 16 to 54 inches are:
the Santa Rosa Aqueduct (built in 1959), the Sonoma Aqueduct (built in 1963), the Petaluma Aqueduct (built in 1962), and the Cotati Intertie (built in 1977).

Sonoma Water remains dedicated to serving our communities and securing our future through responsible resource and environmental stewardship, continued technical innovation, investment in critical infrastructure and effective fiscal management. A few highlights of programs and projects that Sonoma Water accomplishes in collaboration with the water contractors and other partners that benefit the community are summarized below.

More information can be found on Sonoma Water's website at: https://www.sonomawater.org.

Santa Rosa Plain Water Supply Resiliency: Reactivate three Santa Rosa Plain Wells, utilizing $6.9 million in Department of Water Resources grant funding for two of the wells, and implement Aquifer Storage and Recovery for additional water supply reliability and alleviate drought impacts to the water contractors and their customers.
• Regional Water Supply Resiliency: Sonoma Water has worked collaboratively with the water contractors to improve the region's water supply reliability during periods of water supply shortage due to drought, seismic, and other hazard events. Using Sonoma Water's transmission system as the backbone, Sonoma Water will pursue development of a Regional Water Bank Implementation Strategy to integrate the most significant regional water storage facilities (Lake Sonoma, groundwater basins, Lake Stafford, and Marin Water reservoirs).
• Hazard Mitigation: Sonoma Water and its water contractors have invested substantially in efforts to protect water supply infrastructure with continued emphasis on implementing high priority seismic and flood hazard mitigation projects.
• Sonoma-Marin Saving Water Partnership (SMSWP): Sonoma Water is administering a $4 million regional drought resiliency program with a $2 million United States Bureau of Reclamation grant that is being passed through to the water contractors to implement critical drought resiliency programs.

Sonoma Water Draft 2/26/2025
• Water, Stormwater, and Energy Education Program: Sonoma Water collaborates with the SMSWP and Sonoma Clean Power to bring its education program annually to more than 16,000 local students. • Dry Creek Habitat Enhancement: Sonoma Water, the water contractors, and the U.S. Army Corps have completed 5 miles of restoration to date. The U.S. Army Corps agreement with Sonoma Water provides a 65 percent cost share to complete fishery habitat restoration work in Dry Creek.

Sonoma Water leverages partnerships to implement programs funded from other sources that also benefit the water contractors and the community they serve:
• Quagga Mussels: Sonoma Water collaborates with the U.S. Army Corps of Engineers, the California Department of Fish and Wildlife, and the California Department of Boating and Waterways on a boat inspection strategy to prevent invasive mussel infestations in Lake Mendocino and Lake Sonoma. • Forecast Informed Reservoir Operations (FIRO): FIRO is an ongoing collaborative program with Sonoma Water, the U.S. Army Corps of Engineers, and a multi-agency steering committee that began in 2012.

FIRO is a flexible water management approach that uses data from watershed monitoring and improved weather forecasting to help water managers selectively retain or release water from reservoirs for increased resilience to droughts and floods.
• San Francisco Bay Advanced Quantitative Precipitation Information System (AQPI): A $20 million grant from the Department of Water Resources was awarded to Sonoma Water and its partners to install four X-Band radars in the Bay Area to provide improved precipitation and hydrologic information to water agencies, flood control managers, and emergency personnel. The radar data will result in improved management of water supply reservoirs, and improved operations of wastewater systems and flood protection facilities.

Infrastructure Investments
The draft FY 2025/2026 Water Transmission Budget supports Sonoma Water's five-year strategic plan by continuing investments to upgrade aging infrastructure and systems. Sonoma Water's critical water infrastructure, including aqueducts, pipelines, pump stations, storage tanks, and wells supply essential water to all water contractors and ultimately 600,000 residents in Sonoma and Marin county. Undervaluing the actual costs to operate, maintain, and improve this system could jeopardize this essential service with drastic consequences given our role as a wholesaler. Our critical infrastructure is gradually aging after decades of reliable service. A significant portion of it is approaching the end of its useful lifespan. Sonoma Water is currently developing an Asset Management Program. Preliminary assessments of the water production/transmission systems indicate that a large portion is in less than acceptable (i.e. fair, poor, or failed) condition. The age of the infrastructure, current condition of assets, combined with substantial levels of deferred maintenance, underscores the importance of making investments to guarantee a reliable water source for more than 600,000 residents in portions of Sonoma and Marin counties. Furthermore, Sonoma Water is also currently working to prepare a 20-year Comprehensive Water Master Plan on the water production/transmission system. The assessment data collected under the Asset Management Program will be incorporated, along with recommendations of other current seismic and regional resilience planning efforts, into the 20-year Comprehensive Water Master Plan.

Sonoma Water, our water retailers, and the industry at-large are facing very similar challenges: aging infrastructure, rising operating and maintenance costs, water usage fluctuations resulting in lower revenues, etc.

These challenges drive rate increases which have a financial impact on end users but are necessary to upgrade infrastructure and ensure reliable service. Similar to the water contractors, Sonoma Water has deferred maintenance and capital projects in an effort to keep water rate increases as low as possible, while providing clean, reliable, essential water for the benefit of the water contractors and the 600,000 customers they serve every day. As presented, the draft budget does not address the full needs of maintenance and improvements for the water transmission system but allows significant progress toward that goal. There will continue to be pressure on rates in the coming years as additional infrastructure investments are required to fully meet the needs of the system. In this budget, Sonoma Water has cut and deferred more than $16.69 million in O&M, subfund, and capital projects from the FY 2025/2026 budget and $87.93 million in additional capital project Sonoma Water ii Draft 2/26/2025
costs that would occur in the 3-year required time frame for expending revenue bonds to finance improvements resulting in rate increases of nearly 40 percent, to the proposed rates within this package (7.60% for Sonoma Aqueduct/8.68% for Santa Rosa Aqueduct/10.76% for Petaluma Aqueduct).

Sonoma Water works diligently to secure alternate funding and utilize cost effective financing mechanisms to moderate rate increases. Sonoma Water has been successful in securing grants from various sources and has utilized fund balances and bond proceeds in this effort. In fact, Sonoma Water's wholesale rates (the rates tha re charged to water contractors) continue to be among the lowest in the greater Bay Area. Future proposed udgets will continue to prioritize ongoing infrastructure maintenance, replacement, and improvement to ensure a sustainable source of water for the benefit of the communities served This draft FY 2025/2026 Water Transmission Budget has been developed based on the 36-month average water deliveries of 42,407 Acre-Feet (AF) and is shown below.

FY24-25 FY25-26
Budget Budget Change
(in Millions) | (in Millions) (in Millions)
Operations and Maintenance $45.41 $45.87 $0.46
Capital Projects $15.66 $18.28 $2.62
Biological Opinion Compliance, Water $7.53 $8.80 $1.27
Supply Planning, Water Conservation
Debt Service $5.83 $9.07 $3.25
Totals $74.43 $82.02 $7.60
Grants, Use of Fund Balance, and Bond $18.13 $21.22 $3.09 Proceeds
Sonoma Water Draft 2/26/2025
Budget and Rate Reduction Measures:
• Reduced rate increase from 10.67% to 8.68% (Santa Rosa Aqueduct), 11.97% to 10.76% (Petaluma Aqueduct) and 9.37% to 7.60% (Sonoma Aqueduct).

Changes made since January 17, 2025 Draft Water Transmission Budget:
• Reduced O&M contract services by an additional $871,000 by deferring the Collector Capacity Study, and portions of the Natural Hazard reliability study, Wohler-Mirabel Flood Resilience Alternatives Evaluation, Transmission System Condition Assessments, and the Tank Recoating Program. The consequences of reducing the tank recoat program budget are that for the subsequent two fiscal years (FY 2026/2027 and FY 2027/2028), there will be less of a buffer for cost overruns, less water sales revenue, reduced capacity to build fund balance to smooth rates, and on top of the rate increase needed to operate and maintain the water transmission system, there would be up to an additional 3% increase in rates each year just from the tank recoat program. Note that we also deferred Tank recoat costs in the prior year's budget as a rate reduction measure. The additional funding for the tank recoat program has been included in the budget to smooth rates over the 10-year tank recoat program. • Reduced Watershed Planning/Restoration contract services by $100,000 for the Dry Creek Habitat Enhancement - Phase 4.
• Reduced Common Facilities FY25/26 budget request by $1.5 million by deferring design costs for the Water Treatment System Modernization - Phase 2 and deferring project construction of the Collector 3 and 5 Liquefaction Mitigation to FY28/29.

Incorporated additional revenue of $860,854 tied to the Warm Springs Dam Hydropower Retrofit Project for FY24/25 in Common Facilities. This revenue reflects a new request for reimbursement from the Power and Water Resources Pooling Authority Cap-and-Trade Program. It has a dollar-for-dollar reduction on the amount of bond funding needed in Common Facilities over the 3-year bond window. • Revised bond and loan charges: a) updated debt service figures; b) Common Bond Charges are decreasing due to removal of costs tied to the Water Treatment System Modernization - Phase 2 Project, Collector 3 and 5 Liquefaction Mitigation Project, and factoring in the additional revenue to reimburse costs for the Warm Springs Dam Hydropower Retrofit Project. • Updated Exhibit A to reflect changes noted above and to fix typographical errors in the amount of reductions from the Tank Recoating Program and Ely BPS Flood Control and Electrical Upgrade Project. • Fixed sum error in calculation of rate for Water Management Planning. This resulted in an additional $20,000 in expenses, increasing the rate by $0.47 A/F.
• Various other typographical or sum errors not affecting the rate.

Changes made since February 24, 2025 Draft Water Transmission Budget:
• Increased the discretionary Petaluma Aqueduct Capital Charge from $0 to $10/AF at the request of the contractors served from the Aqueduct and updated figures throughout book to reflect this change. • Other typographical fixes not affecting the rate.

FY 2025/2026 Draft Budget Financial Summary compared to FY 2024/2025 Adopted Budget: Factors affecting the rate increase:

The terms of the Restructured Agreement for Water Supply require that budgeted deliveries be the lesser of the preceding twelve months of water delivered, or the average annual amount of water delivered during the preceding 36 months. This requirement is to ensure Sonoma Water can meet its obligation to set rates at an Sonoma Water iv Draft 2/26/2025
amount that covers the projected costs for the following year. Sonoma Water must also generate sufficient revenue to cover debt obligations and maintain a debt coverage ratio as stipulated in outstanding bond issuances.

Deliveries remain low by historical standards and trends show negative or flat growth both in the near and long term. Sonoma Water's rate is fully volumetric meaning that lower deliveries drive rates higher. Year-to-year differences in budgeted deliveries averaged over the 3-, 5-, and 10-year periods have been negative, even when including the deviation proposed and approved in FY 2024/2025 to use the higher of the delivery numbers. Year- to-year differences in actual deliveries inherently have more variability but have also shown flat growth when averaged over the 3-, 5-, and 10-year periods.

Difference in Year-to-Year Budgeted Difference in Year-to-Year Actual Deliveries Deliveries
3-year 5-year 10-year 3-year 5-year 10-year
average average average average average average
-2.31% -0.37% -0.37% 1.30% 0.56% 0.44%
Water Deliveries - Budget to Actual
70,000
65,000
60,000
55,000
Acre-Feet
50,000
45,000
40,000
35,000
FY08-09 FY09-10 FY10-11 FY11-12 1712-13 FY13-14 FY14-15 FY15-16 FY16-17 FY17-18 FY18-19 FY19-20 FY20-21 FY21-22 FY22-23 FY23-24 Fiscal Year
—Budget -Actuals
* Increase in actual deliveries in FY20-21 was partially due to the backfilling of Stafford Lake by NMWD. In FY21-22, MMWD took excess winter instream flows. FY22-23 was an historic low at 36,032 AF.

Multiple years of drought and mandated conservation measures resulted in low water deliveries, low water sales revenue, and significantly reduced fund balance reserves. The FY budgeted deliveries of 42,407 AF represent a 1% decrease (419 AF) from the FY 2024/2025 budget, and the combination of low reserves, increasing operations and maintenance costs to keep pace with critically needed infrastructure improvements, and capital projects to replace aging infrastructure, has contributed to needed rate increases.

Sources of revenue including water sales and charges for services, federal and state grants, existing fund balances, contributions, interest, and bond financing are detailed below:

Sonoma Water Draft 2/26/2025
FY 2025/2026 Increase/(Decrease)
Revenues Draft Budget over FY 2024/2025
Water Sales & Charges for Services $61,064,924 8.4%
Operating Grants 73,000 (93%)
Capital Grants 0%
Contributions 593,870 97.3%
Interest & Investment Earnings 1,091,434 (.8%)
TOTAL $62,823,228 6.9%
*Operating Grant decrease associated with $1 million Sonoma Marin Drought Resiliency USB WEEG Grant. Grant budgeted in FY24/25. This is a multi-year project and projec revenues/expenses will be rolled forward into the adjusted budget. *Contributions include TOW diverted revenue and WUE Passthroughs including the new $250,000 Spatial Analysis Project which is rate neutral. Without spatial analysis the increase would be

15.7%.

FY 2025/2026 Increase/(Decrease)
Fund Balance Draft Budget over FY 2024/2025
Use of Fund Balance: 34% from Operating
Funds; 66% from Capital Funds $ 7,932,963 (25%)
FY 2025/2026 Increase/(Decrease)
Bond Funds Draft Budget over FY 2024/2025
Use of Bond Funds (FY 2025/2026: issuing
$32.96 million in revenue bonds) $ 13,215,000 105%
Budget Requirements:
: Maintain 3-menth operating reserve. Maintain 1.15x debt coverage bond covenant. • Rates collect 1.15x debt service in accordance with the provisions of the Water Transmission System Master Ordinance.

Significant efforts have been made to cut and defer more than $16.69 million in 0&M, subfund, and capital projects from the FY 2025/2026 budget and $87.93 million in additional capital project costs that would occur in the 3-year required time frame for expending revenue bonds (see Exhibit A). The proposed rate increases are

7.60% to 10.76% for prime contractors served from the three aqueducts. See page xi which also includes rates for Town of Windsor, NMWD, and MMWD. Sonoma Water is not alone in facing rate pressures, as decreasing water sales are forcing other wholesalers and retailers to raise rates beyond historical averages to address maintenance and capital needs.

Operations and Maintenance (0&M)
• 8.4% increase in water sales revenue due to a decrease in deliveries and the rate needed to cover budgeted expenditures.
• 1.0% increase in budgeted expenditures. Budgeted expenditures increase is mostly attributable to cost increases for maintenance equipment, equipment rentals and leases, SCADA system contributions, Sonoma Water vi Draft 2/26/2025
utilities, and staff labor costs tied to negotiated labor agreements, offset by decreases in other contract services.
• O&M budget has been reduced by $10.04 million by deferring maintenance costs, studies, and projects.

Included in this amount is a $3.21 million reduction to the Tank Recoat Program and a $3.05 million reduction to the SR AQ Cathodic Protection project. These deferrals could result in rate spikes in future years as the projects cannot be deferred indefinitely. See list of deferrals in Exhibit A. • Deferring maintenance projects reduced the O&M rate increase from more than 21.7% to 1.4%. • Budgeted projects have been thoroughly reviewed and edited and represent the budgeted work that can reasonably occur in FY 2025/2026. Budgeted maintenance projects are a priority, and further delays and cuts pose detrimental operational impact and risk.
• Must have sufficient net operating revenues to meet 1.15x debt coverage bond covenant requirement.

Note that this budget includes a $32.96M bond issuance to fund the capital program. • Water Sales Revenue Shortfall:
• FY2022/2023: $10.2M
• FY 2023/2024: $1.6M
• FY 2024/2025:Currently estimating we will meet budgeted deliveries • FY 2024/2025 expenditures are anticipated to align with the adjusted budget. Unspent budget is rolled forward to subsequent budget years to avoid being included in the rate calculation more than once.

See pages 19-26 for details on major services & supplies, maintenance - equipment, and consulting/contractual services occurring in FY25/26.

Capital Projects
Capital Projects: FY 2025/2026 draft budgeted expenditures of $18.28 million increased by $2.62 million or

16.73%. The capital program is fully funded by grants, bonds, and use of fund balance. See detailed list of capital projects on page xvii.

Capital budget has been reduced by $5.37 million by deferring design of Water Treatment System Modernization - Phase 2, construction awards for Collectors 3 and 5 Liquefaction Mitigation, and the Bennett Valley Fault Crossing Project pending availability of grant funding. Capital budget also reduced by $87.93 million in additional capital project costs that would have occurred in the 3-year required time frame for expending revenue bonds. See list of deferrals in Exhibit A.

Hazard mitigation projects ($8.31 million) and infrastructure improvement projects/drought resiliency projects ($9.97 million) are fully funded by Water Revenue Bonds, Grants, and Fund Balance.

Investing in Infrastructure:

Construction: Hazard Mitigation Projects $8,176,284
Ely BPS Flood Control & Electrical Upgrade 426,440
River Diversion Structure (RDS) Upgrade Project 4,000,000 Seismic Retrofit of Storage Tanks 1,057,177
Wilfred Booster Station 2,692,667
Design: Hazard Mitigation Projects $130,247
Santa Rosa Creek Crossing 130,247
Sonoma Water vii Draft 2/26/2025
Construction: Other Capital Projects $7,259,724
Mirabel Collector Wells Pump Hoist Upgrades 2,431,357
Occidental Road Well 920,949
Ralphine Tanks Flow Thru Conversion 280,540
Sebastopol Road Well 707,215
Todd Rd Well Discharge Connection 597,110
Warm Springs Dam Hydropower Retrofit 2,322,553
Design Other Capital Projects $2,714,165
Kawana-Ralphine SBS Pipeline 767,250
Mirabel/Wohler Storage Building 411,130
Water Treatment System Modernization - Phase 1 526,880
Water Treatment System Modernization - Phase 3 (River Road) 1,008,905 • 9.6% increase in revenue due to a decrease in deliveries and the rate needed to cover budgeted expenditures.
• Subfund budget has been reduced by $1,062,000 by deferring costs. See list of deferrals in Exhibit A. $3.2 million in Use of Fund Balance reduces rate increase from 202.58% to 14.14%. • 14.14% rate increase compared to 11.37% increase in FY 2024/2025 when $1.7 million in Use of Fund Balance was budgeted.
• Expenditures are anticipated to range from $3 million to $4.5 million annually in this subfund. A rate of $45.71/AF at 42,407 AF generates $1.93 million in revenue. There is a need to increase revenue in this fund to cover a greater portion of annual costs as we continue to utilize fund balance to keep the rate low. If more fund balance were used, there would be a significant rate spike in subsequent years to generate sufficient revenue for the subfund. The rate increase is intended to smooth future rate increases. • See pages 34-36 for list of consulting/contractual services occurring in FY25/26.

Water Conservation
• 14.1% decrease in revenue due to a reduction in anticipated grant revenue partially offset by rate needed to cover budgeted expenditures.

15.11% decrease in expenditures.
• Subfund budget has been reduced by $126,000 by deferring costs. See list of reductions in Exhibit A. • $210,000 in Use of Fund Balance. Reduces rate increase from 15.51% to 7.20%. • FY 2024/2025 Adopted Budget used $250,000 in Fund Balance to reduce the Water Conservation Rate Increase to 10.11%.
• Without the Use of Fund Balance in the FY 2024/2025 Adopted budget, the Water Conservation rate increase would have been 20.90%.
• See pages 34-36 for list of consulting/contractual services occurring in FY25/26.

This year the Water Conservation Subfund budget is only inclusive of what is needed to maintain existing successful regional programs of the Partnership, including the Water Education Program, Green Business Program, Garden Sense Program, Water Loss Working Group and Validation Services, QWEL Program, Eco- Friendly Garden Tour, and WaterSmart Plant Label Program. The budget also includes funds to implement a Sonoma Water viii Draft 2/26/2025
spatial analysis project for the Sonoma-Marin Saving Water Partnership that has offsetting revenue contributed outside the subfund rate by participating members.

Water Management Planning and Recycled Water and Local Supply For both of these subfunds, low budgeted expenditures, low rates, and use of fund balance have minimal impact (3.3% and 0.1% respectfully) on the overall rate increase.

Water Management Planning rate is increasing for budget needed for the Annual Water Supply & Demand Assessment and upcoming 2025 Urban Water Management Plan (UWMP). The increase in the rate is to fund a new consultant agreement for these tasks and associated staff time. Sonoma Water used $156,000 in Fund Balance towards this effort. See pages 34-36 for list of consulting/contractual services occurring in FY25/26.

Recycled Water and Local Supply costs have historically been for Sonoma Water's share of the groundwater sustainability agency's contributions. Sonoma Water's share of mandatory fees has been included in the Agency Operating fund since FY 2024/2025. The rate is set to $0.14/AF which covers depreciation expenses incurred in the fund.

Debt Service
Debt Service Expenditures increase by $3.25M or 55.8% resulting from the planned issuance of $32.96M in 2025 Water Revenue Bonds to fund critical infrastructure projects in Petaluma AQ, and Storage and Common capital funds.

Debt service is driving the majority of the rate increase. A list of capital projects that we anticipate funding with revenue bond proceeds in the 3-year required time frame is shown in the Long-Range Financial Plan.

Summary
The draft proposed budget for FY 2025/2026 is based on accomplishing the required elements of the Biological Opinion, maintenance of facilities, continued implementation of hazard mitigation and reliability projects, and projects to maintain, replace, and improve critical infrastructure.

Significant efforts have been made to cut and defer more than $16.69 million in O&M, subfund, and capital projects from the FY 2025/2026 budget and $87.93 million in additional capital project costs that would occur in the 3-year required time frame for expending revenue bonds (see Exhibit A). The proposed rate increases are

7.60% to 10.76% for prime contractors served from the three aqueducts. See page xi which also includes rates for Town of Windsor, NMWD, and MMWD.

Sonoma Water recognizes the profound impact of natural hazards, the remnants of the COVID-19 pandemic, inflationary pressures, and other economic circumstances to many residents, businesses, and our retail water contractors throughout our county and beyond. In response to the far-reaching financial hardships, Sonoma Water made a conscious effort to reduce rate increases while continuing to maintain system reliability and public health and safety.

Factors affecting the Rate Increase:
• 1.0% decrease in deliveries
• Three years with actual water deliveries at 4%, 21.2%, and 1.2% less than budget. Total budget shortfall over three years is 12,105 AF. This resulted in a $12.8M revenue shortfall over 3 years. • 1.0% increase in O&M costs.
• 16.7% increase in Capital Project costs mostly attributable to capital project construction costs. • 16.9% increase in Subfund costs.

Sonoma Water ix Draft 2/26/2025
• 55.8% increase in debt service tied to 2025 Water Revenue Bond necessary to fund near-term critical capital improvement projects.
• 12.3% of the rate increase is attributable to the O&M budget, 74.9% to capital projects and debt service, and 12.8% to the subfunds (Water Management, Watershed Planning and Restoration, Recycled Water and Local Supply, and Water Conservation).
• Increases in material and equipment costs for aging infrastructure and priority maintenance projects that can no longer be deferred, supply chain disruptions, long lead times on equipment, and the current inflationary environment are putting continued upward pressure on the Water Transmission System Sonoma Water continues to have one of the lowest wholesale water rates in the San Francisco Bay Area. The chart below compares the proposed FY25/26 (if known) rate per AF to the current rates of other wholesale water agencies in the bay area.
$2,400
$2,200
$2,000
$1,800
$1,600
$1,400
$1,200
$1,000
$800
$600
$400
$200
$-
Sonoma County Water Zone 7 Water Agency Valley Water San Francisco Public Utilities Contra Costa Water District Agency Commission
* SFPUC and Valley Water rates for FY25/26 not available and FY24/25 rates are used as a placeholder.

Sonoma Water Draft 2/26/2025
Proposed rates are shown in the table below:

Charge / Aqueduct Santa Rosa | Petaluma | Sonoma
Deliveries (Acre-Feet) 42,407
0&M $1,029.16 $1,029.16 $1,029.16
Water Management Planning $4.57 $4.57 $4.57
Watershed Planning & Restoration $45.71 $45.71 $45.71
Recycled Water and Local Supply $0.14 $0.14 $0.14
Water Conservation $63.83 $63.83 $63.83
Total O&M $1,143.41 $1,143.41 $1,143.41
Storage & Common Bond/Loan Charges $246.45 $246.45 $246.45 Petaluma Aqueduct Bond/Loan Charge $15.66
Sonoma Aqueduct Bond/Loan Charge $144.56
Prime Contractors $1,389.86 $1,405.52 $1,534.42
Discretionary Charges
Capital Charges - to build fund balance for $11.00 $10.00 $34.90 future projects
Total Prime Contractors $1,400.86 $1,415.52 $1,569.32
Total Overall Increase: 8.68% 10.76% 7.60%|
Entity Rate per AF Rate Increase
Town of Windsor $1,400.86 8.68%
Town of Windsor (Diverted Water) $114.26 14.32%
NMWD 1,472.48 6.30%
MMWD $1,740.53 8.79%
• Deliveries: (Budget Packet Pages 9-14):

FY 2022/2023 FY 2022/2023| FY 2023/2024 FY 2023/2024 FY 2024/2025 FY 2025/2026 Budget Actuals Budget Actuals Budget Est. Budget
3-year average 12-months 3-year average 3-year average
45,748 36,032 41,847 41,317 42,826 42,407

21.2% less 1.3% less than
than budget budget
A/F change (9,716) (530)
/ FY 2024/2025 Budgeted Deliveries vs FY 2025/2026 T 1.0% decrease Budgeted Deliveries
Sonoma Water xi Draft 2/26/2025
• Operations and Maintenance (0&M) - Water Transmission O&M Fund (Budget Packet Pages 15-26):
• In accordance with the Restructured Agreement for Water Supply:
• The rate is calculated by dividing operations and maintenance expenditures (less specific cash and noncash revenues and expenditures) by budgeted deliveries.

Increase
Percent
0&M Fund (Decrease) Description
in Dollars Change
Rate per AF $13.77 1.36% Increase is attributable to increased infrastructure maintenance needs.

Revenue $4,681,000 8.27% Increase in revenue is attributable to the rate increase.

Increase is attributable to cost increases for maintenance equipment, equipment rentals and leases, SCADA system
Expenditures $4,401,000 6.93% contributions, utilities, staff labor costs tied to negotiated labor agreements, and other expenditures increases described below, offset by decreases in contract services. OT also increased due to increase in Petaluma Aqueduct Capital Charge.

Factors affecting the O&M rate:
0&M Fund Increase
Percent
(Decrease) Change Description
Expenditures
in Dollars
Increase is attributable to an increase in labor costs for Labor $1,022,000 5.06% maintenance projects, offset by projects deferred to reduce the rate increase. The majority of this increase is due to negotiated labor rates.

Power demand and costs expected to increase roughly 13%. The Power $553,000 13.00% majority of this increase is associated with increased transmission and distribution costs.

Chemicals ($1,000) -0.06% Costs expected to remain stable after several years of large increases.

Increase associated with expanded sampling and analysis tied to Testing/Analysis $10,000 4.17% the Santa Rosa Plain Wells Projects as well as additional microplastics and Perfluoroalkyl/Polyfluoroalkyl Substances (PFAS) testing.

Contract Services ($2,462,000) -20.46% Decrease attributable to deferring cathodic protection and tank recoats.

Maintenance - Increase attributable to increased costs of the Pump 9 replacement $169,000 6.78% offset by $270,000 in projects that have been deferred to reduce Equipment the rate increase.

Rents and Leases
$175,000 43.75% Increase to align with FY23/24 actuals. - Heavy Eqt
Sonoma Water xii Draft 2/26/2025
Increase
0&M Fund Percent
(Decrease) Description
Expenditures in Dollars Change
Equipment $105,000 crease attributable to increased use of Sonoma Water equipmer

9.55%
Usage Charges implement routine maintenance project
SCADA $354,351 16.17% Increase attributable to water transmission system's share of SCADA maintenance expenses and capital project costs.
perating Transfers (OT's) move revenue generated by rates into Operating espective funds (debt service funds, subfunds, aqueduct capita Transfers $3,946,000 8.00% funds and Common Facilities) and maintain an appropriate fund balance. OT also increased due to increase in Petaluma Aqueduct Capital Charge.
• Subfunds: (Budget Packet Pages 27-36):
• Subfund rates are calculated by dividing subfund expenditures minus grant revenue by budgeted water deliveries.

Water Management Planning:
• Expenditures are for Urban Water Management Planning (UWMP) which is required to be updated every five years and the Annual Water Supply & Demand Assessment.

Water Increase
Percent
Management (Decrease) Description
Planning in Dollars Change
Fiscal Year 2024/2025 rate is $0.35. Fund is for Urban Water Management Plan updates and the Annual Water Supply &
Rate per AF $4.22 1206.1% Demand Assessment. Using $156,000 in fund balance. Rate increase is due to use of fund balance to reduce rates in prior years and work needed to submit the 2025 Urban Water Management Plan.

Increase due to subfund rate increase and decreased interest Revenue $186,000 803.1% earnings offset by use of fund balance. Increasing use of fund balance to smooth rate increases.

Budget increase is due to contract service and staff time related to he Annual Water Supply & Demand Assessment and 2025 Urbar Expenditures $205,000 141.4% Water Management Plan. Low budgeted expenditures, low rates, and use of fund balance have minimal impact (2.7%) on the overall rate increase.

Sonoma Water xili Draft 2/26/2025
• Watershed Planning and Restoration:
• Expenditures are for planning, design, and implementation of watershed restoration projects and projects required under the Biological Opinion.

Watershed Increase
Percent
Planning and (Decrease) in Description
Change
Restoration Dollars
Biological Opinion, and fire fuel reduction offset by the increased Rate per AF $5.66 14.1% use of fund balance. Rate of $121.17/AF based on $5.1M in expenditures and 42,407 AF is reduced to $45.71/AF by using $3.2M in fund balance. In Fiscal Year 2024/2025, $1.7M in fund balance was utilized to offset rate increases.

Increase due to subfund rate increase and higher interest $190,000 9.6% earnings offset by use of fund balance to reduce and smooth Revenue
overall rate increase.

Increase in expenditures for maintenance of Dry Creek Habitat Enhancement Phases 4 and 5, increased efforts for RRIFR Expenditures $1,681,000 48.6% Estuary Management & Monitoring, fire fuel reduction, and required efforts for the new biological opinion.

Sonoma Water xiV Draft 2/26/2025
• Recycled Water and Local Supply:
• Expenditures are for planning, design, and implementation of recycled water and local supply projects. The fund previously included water contractor projects under the Local Recycled Water Tier 2 (LRT2) Program.

Increase
Recycled Water Percent
(Decrease) Description
and Local Supply in Dollars Change
NA - last Fiscal Year 2024/2025 rate is $0.00. Rate increase of $0.14 for Rate per AF $0.14 FY rate was depreciation.
$0.

Revenue ($2,000) -22.2% Using an estimated $0 in fund balance. Decrease in revenue is associated with decreased expenses in the subfund.

Decrease is due to Sonoma Water's share of Groundwater
Expenditures ($25,000) -80.6% Sustainability Agency mandatory fees moving to the Agency Operating Fund.

Water Conservation:
• Expenditures are for water use efficiency projects, outreach, and education.

Increase
Water Percent
(Decrease) Description
Conservation Change
in Dollars
Fiscal Year 2024/2025 rate is $59.55. Rate increase is primarily a as loused i prior ear rize or i A Dated on orie rate
Rate per AF $4.29 7.2% net expenditures and 42,407 AF is reduced to $63.83/AF by using $210,000 in fund balance. In Fiscal Year 2024/2025, net expenditures were $2.8M and $250,000 in fund balance was utilized to offset rate increases.

Decrease due to subfund rate increase offset by lower anticipated Revenue ($539,000) -14.1% grant funding than prior year budget.

Expenditures ($589,000) -15.1%
and address ongoing water conservation needs.

Sonoma Water xV Draft 2/26/2025
• Storage, Common, and Sonoma Bond/Loan Charges: (Budget Packet Pages 48-62):

The rates are calculated by dividing the annual debt service and reserve requirements (2015A, 2019A, 2022A, and anticipated 2025A Water Revenue Bonds) by water deliveries.

Storage and
Increase
Common Percent
Bond/Loan (Decrease) Description
in Dollars Change
Charges
Fiscal Year 2024/2025 rate is $31.47. Rate is based on revenue Storage
Bond/Loan $18.63 59.2%
Charge
water deliveries.

Fiscal Year 2024/2025 rate is $131.22. Rate is based on revenue Common requirement for debt service divided by water deliveries. Total Deb Bond/Loan $65.13 49.6% service higher than previous year due to issuance of 2025 Bonds Charge for capital projects in the Common Fund and decrease in budgeted water deliveries.

Fiscal Year 2024/2025 rate is $O. Petaluma Aqueduct pays an Petaluma additional revenue bond charge for the bonds associated with Ely Aqueduct NA- last BPS Flood Control and Electrical Upgrade and Wilfred Booster Bond/Loan $15.66 FY rate was Station Projects. Reduced Aqueduct Capital Charge and use of Charge $0. Fund Balance in prior years results in total Debt service and rate increase that are higher in FY 2025/2026 as Petaluma AQ will be bonding for the first time with the 2025 Revenue Bond Issuance.

Fiscal Year 2024/2025 rate is $145.49. Sonoma Aqueduct pays an additional revenue bond charge for the bonds associated with Sonoma Sonoma Booster Station Electrical Upgrade and Pumping Reliability Aqueduct ($0.93) -0.6% Project, Bennett Valley Fault Crossing Project, and other Creek Bond/Loan Crossing Projects on the Aqueduct. Total Debt service lower than Charge previous year due to structure of the bond payments and the fact that Sonoma AQ will not be utilizing funds from the 2025 Revenue Aqueduct Capital Charge: (Budget Packet Page 1):
• A discretionary charge is added by the water contractors to build fund balance for future aqueduct capital projects and to provide rate stabilization capacity. • The FY 2024-2025 budget included an $11 per Acre-Foot charge for the Santa Rosa Aqueduct, a $0 per Acre-Foot charge for the Petaluma Aqueduct, and a $34.90 per Acre-Foot charge for the Sonoma Aqueduct.
• The FY 2025-2026 draft budget includes a $11 per Acre-Foot charge for the Santa Rosa Aqueduct, a $10 per Acre-Foot charge for the Petaluma Aqueduct, and a $34.90 per Acre-Foot charge for the Sonoma Aqueduct pending input from the water contractors
• Overall Draft Proposed Rate Increases: (Budget Packet Pages 1-8):
• 8.68% (Santa Rosa Aqueduct); 10.76% (Petaluma Aqueduct); 7.60% (Sonoma Aqueduct) • FY2025/2026 budgeted deliveries are based on 36-month average water deliveries (42,407 AF).

FY2025/2026 budgeted deliveries are 1.0% less than FY 2024/2025 budgeted deliveries.

Sonoma Water xvi Draft 2/26/2025
FY 2025-2026 Capital Projects (Budget Packet Pages 37-46):

Water Transmission Budget FY25-26
Capital Projects Summary
Project Category Amount Status
Santa Rosa Creek Crossing Santa Rosa AQ 130,247 Funding de-obligated; re-evaluating project design and schedule Ely BPS Flood Control & Electrical Upgrade Awarded Q3 FY21/22; Delayed due to Elec Supply Chain issues; Substantial Completion Petaluma AQ anticipated Oct 2025
Wilfred Booster Station Petaluma AQ 90% design; Prepurchase Elec Equip in fabrication; Anticipate Construction Award Q1 FY25/26 Kawana-Ralphine SBS Pipeline Storage Consultant Selection 24/25; multi year design; construction award anticipated FY28/29 Seismic Retrofit of Storage Tanks Storage Site specific geotech planned at each tank; seismic upgrades tied to Tank Recoat schedule Ralphine Tanks Flow Thru Conversion Storage 1st tank design underway; flow mixing system upgrades tied to Tank Recoat schedule Mirabel Collector Wells Pump Hoist Upgrades Common Design agrmt anticipated Q3 FY24/25; construction award anticipated Q4 FY25/26 Mirabel/Wohler Storage Building Common Design Advancing; CEQA/permitting commencing Q4 FY24/25; Anticipate award FY26/27 River Diversion Structure (RDS) Upgrade Project Common Design Advancing; Anticipate award in FY25/26 Occidental Road Well Well drilling contract complete FY23/24; topside design complete FY24/25; construction award Common
Sebastopol Road Well Construction ongoing; delays in electrical equipment delivery; Substantial Completion anticipated Common 707,215 |Q4 FY24/25
Todd Rd Well Discharge Connection Common Design and Construction award in 25/26 Warm Springs Dam Hydropower Retrofit Common Switchgear pre-purchased in FY24/25. Design being finalized; Anticipate award in Q2 FY25/26 Water Treatment System Modemization - Phase 1 Common 1,08,960 Dani acquit on cing ed FY 24256268 Design agrmt anticipated Q4 FY24/25; construction award anticipated FY26/27 Water Treatment System Modemization - Phase 3 (River Road) Common TOTAL 18,280,420
Santa Rosa AQ 130,247
Petaluma AQ 3,119,107
Sonoma AQ
Storage 2,104,967
Common 12,926,099

18.280,420
Sonoma Water xvii Draft 2/26/2025
Sonoma County Water Agency
Fiscal Year 2025/2026 Draft Water Transmission Budget and Rates Budget Packet Page
Rates
Prime Contractor Rates Summary 1-2
Water Charges Per Acre-Foot
Revenue Summary
O&M Rate
Line Item Rate Comparison
Russian River Projects and Conservation Charges
Deliveries
Deliveries (36 Mo) 9
10 Deliveries and Revenue - All Aqueducts 11
Deliveries and Revenue - Santa Rosa Aqueduct 12
Deliveries and Revenue - Petaluma Aqueduct 13
Deliveries and Revenue - Sonoma Aqueduct 14
Agency O&M Fund
Agency Fund Cash Summary 15-18
Major Services and Supplies Expenditure Items 19
Equipment Maintenance, Contracts, Consulting Services 20-21 Contract Services & Contributions Project Information 22-26 Subfunds
Water Management Subfund 27
Watershed Planning and Restoration Subfund 28-29
Recycled Water and Local Supply Subfund 30-31
Water Conservation Subfund 32-33
Subfund Contract Services 34-36
Facilities and Other Funds
Santa Rosa Aqueduct Capital Fund 37-38
Petaluma Aqueduct Capital Fund 39-40
Sonoma Aqueduct Capital Fund 41-42
Storage Facilities Cash Summary 43-44
Common Facilities Cash Summary 45-46
North Marin Water Deposit Fund 47
Common Bonds 2015 Cash Summary
Sonoma Bonds 2015 Cash Summary
Common Bonds 2019 Cash Summary
Sonoma Bonds 2019 Cash Summary
Storage Bonds 2022 Cash Summary # 8 8 81291
Common Bonds 2022 Cash Summary
Sonoma Bonds 2022 Cash Summary
Petaluma Bonds 2025 Cash Summary
Storage Bonds 2025 Cash Summary
ommon Bonds 2025 Cash Summa
'ond & Loan Charge
Fund Balances and Operating Transfers
Fiscal Year 2025/2026 Prime Contractor Rates Summary
CHARGE PER ACRE FOOT:

Santa Rosa Petaluma Sonoma Percent
Change
Aqueduct Aqueduct Aqueduct
O&M Charge 1.36%
Water Manacge [4.21 $1,029.16 $1,029.16 $1,029.16 $1,015.39 $1,015.39 1206.12% Watershed Pragement Planning Sub-charge [4.13] 4.57 4.57 4.57 $0.35 $0.35 14.14% Recycled Wal Planning/Restoration Sub-charge [4.14] 45.71 45.71 45.71 S40.04 $40.04 N/A Water ConseNater & Local Supply Sub-charge [4.15] 0.14 0.14 7.20% O&M Chargeservation Sub-charge [4.16] 63.83 63.83 $59.55 $59.55 2.52% $1,143.41 $1,143.41 $1,143.41 $1,115.33
Storage and 9e 51.49%
Petaluma Aqnd Common Bond & Loan Charges 246.45 246.45 246.45 $162.69 $162.69 $162 NA Sonoma AquAqueduct Bond Charge 15.66 $0.00 -0.64%
queduct Bond Charge 144.56 $145
PRIME CONT 8.75%
INTRACTORS $1,389.86 $1,405.52 $1,534.42 $1,278.02$1,278.02 $1,423.

Capital Char!
for future proarges - to build fund balance 0.00%
PRIME CONiprojects 11.00 10.00 34.90 $11.00 0.00%
INTRACTORS 11.00 10.00 34.90 $11.00 $34
TOTAL PRIM 8.68%
PIME CONTRACTORS $1,400.86 $1,415.52 $1,569.32 $1,289.02 $1,278.02 $1,458.

Increase from Fiscal Year 2024/2025 8.68% 10.76% 7.60% 9.88% 9.98% 8.1 With No Capital Charge 7.82% 9.98%
Deliveries:
12-month 36-month
FY16-17 40,524
FY17-18 41.446
FY18-19 41,768
FY19-20 43,870
FY20-21 43,707
FY21-22 46,095
FY22-23 45,748
FY23/24 41,847
FY24-25 42,826
FY25-26 42,407
2/26/2025
Fiscal Year 2025/2026 Prime Contractor Rates Summary
• IOUGE I GaI GURUIGUEU
CHARGE PER ACRE FOOT:

Petaluma AQ
Percent
NMWD NMWD Change
0&M Cha FY25-26 FY24-25
Water Malarge [4.21 $1,029.16 $1,015.39 1.36%
Watershellanagement Planning Sub-charge [4.13] 4.57 0.35 1206.12% Recycled led Planning/Restoration Sub-charge [4.14] 45.71 40.04 14.14% Water Coid Water & Local Supply Sub-charge [4.15] 0.14 0.00 N/A O&M Cha onservation Sub-charge [4.16] 63.83 $59.55 7.20% narge $1,143.41 $1,115.33 2.52%
North Malarin Bond & Loan Charge 14.91 148.66 90.54 64.19% Russian F
1 River Conservation Charge [4.18 (a)] 160.41 159.28 0.71% Russian F
1 River Projects Charge [4.18 (b)] 20.00 20.00 0.00%

TOTAL NE
NMWD $1,472.47 S1,385.15 6.30%
Town of Winc Rates Rate Increase
Town of Windindsor 1,400.86 8.68%
NMWD indsor (Diverted Water) 114.26 14.32%
MMWD 1,472.48 6.30%
1,751.63 8.79%
2/26/2025

WATER TRANSMISSION SYSTEM
FY25-26 WATER CHARGES PER ACRE-FOOT
FY25-26 WATER CHARGES PER ACRE-FOOT

FOR PRIME CONTRACTORS

FISCAL SANTA SONOMA
% INCR PETALUMA % INCR. % INCR.

YEAR ROSA AQUEDUCT AQUEDUCT
AQUEDUCT (DECR.) (DECR.) (DECR.)
2025 - 2026 1400.86 8.68% 1415.52 10.76% 1569.32 7.60%
2024 - 2025 1289.02 9.88% 1278.02 9.98% 1458.41 8.14%
2023 - 2024 1173.09 10.56% 1162.09 9.42% 1348.67 10.56% 2022 - 2023 1061.04 6.05% 1062.04 6.15% 1219.90 6.52%
2021 - 2022 3.47% 1000.46 3.47% 1145.18 3.43%
2020 - 2021 966.95 5.30% 966.95 5.30% 1107.21 5.57%
2019 - 2020 918.30 4.60% 918.30 4.60% 1048.80 4.77%
2018 - 2019 877.88 3.67% 877.88 3.67% 1001.06 5.98%
2017 - 2018 846.78 4.98% 846.78 4.98% 944.56 5.58%
2016 - 2017 806.59 5.98% 806.59 5.98% 894.62 6.94%
2015 - 2016 761.05 4.16% 761.05 4.16% 836.55 5.46%
2014 - 2015 730.68 3.60% 730.68 3.60% 793.24 3.19%
2013 - 2014 705.30 4.95% 705.30 4.95% 768.75 3.84%
2012 - 2013 672.03 5.98% 672.03 5.98% 740.34 5.26%
2011 - 2012 634.11 5.00% 634.11 5.00% 703.33 4.28%
2010 - 2011 603.92 6.93% 603.92 6.93% 674.47 8.42%
2009 - 2010 564.78 19.88% 564.78 10.50% 622.11 27.95%
2008 - 2009 471.13 6.66% 511.13 10.71% 486.22 7.22%
2007 - 2008 441.70 2.41% 461.70 2.31% 453.49 2.46%
2/26/2025

WATER TRANSMISSION SYSTEM
FY25-26 REVENUE SUMMARY CHART
FY25-26 FY24-25 FY25-26
WATER CUSTOMER Budgeted Water Rate Proposed Rate Dollar Change Percent Use (Acre-Feet) $/Acre-Foot $/Acre-Foot Change
Santa Rosa Aqueduct 15,733 $1,289.02 $1,400.86 $111.84 8.68% Petaluma Aqueduct 8,949 1,278.02 1,415.52 137.50 10.76% Sonoma Aqueduct 3,565 1,458.41 1,569.32 110.91 7.60%
North Marin Water District 5,357 1,38515 1,472.48 87.33 6.30% Marin Municipal - Fourth 1,751.63 141.54 8.79%
Off Peak 4,300 1,610.09
Marin Municipal - 2,568 1,610.09 1,751.63 141.54 8.79%
Supplemental
Forestville Aqueduct 351 1,289.02| 1,400.86 111.84 8.68% Wholesale/Municipal 965 1,750.08 1,883.18 133.10 7.61%
Surolus 96 1,338.40 1,372.09 33.69 2.52%
Windsor 522 1,289.02 1,400.86 111.84 8.68%
TOTAL 42,407
2/26/2025
SONOMA COUNTY WATER AGENCY RATES FOR WATER DELIVERIES IN FY25-26 [x] ESTIMATED [] OFFICIAL CHARGE PER ACRE FOOT:

Santa Rosa Petaluma Sonoma
Aqueduct Aqueduct Aqueduct

PRIME CONTRACTORS
O&M Charge [4.2] $1,029.16 $1,029.16 $1,029,16
Water Management Planning Sub-charge [4.13] $4.57 $4.57 $4.57 Vatershed Planning/Restoration Sub-charge [4.14] $45.71 $45.71 $45.71 Recycled Water & Local Supply Sub-charge (4.15 $0.14 $0.14 $0.14 Water Conservation Sub-charge [4.16] $63.83 $63.83 $63.83 O&M Charge $1,143.41 $1,143.41 $1,143.41
Bond & Loan Charges - to pay for existing debt service
Storage Facilities Capital Charge (4.7] 50.09 50.09 50.09 Common Facilities Capital Charge (4.8] 196.36 196.36 196.36 Petaluma Aqueduct Facilities Capital Charges [4.6 b] 15.66 Sonoma Aqueduct Facilities Capital Charges [4.6 b] 144.56 Total Bond & Loan Charges 246.45 $262.11 $391.01
Discre Total Bond & Loan Charges 246.45 $262.11 $391.01 Agscretionary:

Aqueduct Capital Charges - to build fund balance for future projects Aqueduct Facilities Capital Charges [4.6 e] 11.00 10.00 34.9 LF
TOTALRT2 - included in Recycled Water & Local Supply Sub-Charge above.

OTAL PRIME CONTRACTORS $1,400.86 $1,415.52 $1,569.32
OTHE $1,389.86 $1,405.52 $1,534.42
Charge without LRT2 and voluntary AQ Capital Charge
(WAITHER AGENCY CUSTOMERS/WHOLESALE CHARGES

OVATER CO'S & PUBLIC AGENCIES)
Cế O&M Charge $1,143.41 $1,143.41 $1,143.41
AQ Capital Charges 246.45 262.11 391.01
TOTA Aqueduct Facilities Capital Charge [4.12] $493.32 $477.66 $348.76 (120%TAL OTHER AGENCY CUSTOMERS/WHOLESALE CHARGES (4.12) 51,883.18 $1,883.18 S1,88318 FORE20% OF HIGHEST PRIME)
OgRESTVILLE
O&M Charge [4.2] * $1,029.16
Water Management Planning Sub-charge [4.13] $4.57
Watershed Planning/Restoration Sub-charge [4.14]| $45.71 Recycled Water & Local Supply Sub-charge (4.15] $0.14
Water Conservation Sub-charge [4.16] $63.83
Bc O&M Charge $1,143.41
Bond & Loan Charges - to pay for existing debt service
Aqueduct Facilities Capital Charges [4.6] 11.00
Storage Facilities Capital Charge (4.7] 50.09
To
Common Facilities Capital Charge [4.8] 196.3(
TOTA Total Capital Charges 257.4
* ForeTAL FORESTVILLE $1,400.86
NORForestille Water District was exempt from Santa Rosa Aqueduct sub-charge from FY 06/07 to FY 16/17 [4.12].

ORTH MARIN WATER DISTRICT
O&M Charge $1,143.41 Note: N. Marin pa
Ru North Marin Bond & Loan Charge (4.9) 148.66 bond and loan chige.

Ru Russian River Conservation Charge [4.18 (a)] 160.41 in lieu of Capital ( TOTA Russian River Projects Charge (4.18 (b)] 20.00
FOUR TAL NORTH MARIN WATER DISTRICT 1,472.48
HibURTH OFF-PEAK (MARIN MUNICIPAL),
Highest Prime on SR and PET AQ x 1.11 $1.571.22
RL.s
TOTAL FOURTH OFF-PEAK $1.751.63

SUPPLEMENTAL (MARIN MUNICIPAL)
Highest Prime on SR and PET AQ x 1.11 $11.10 1560.12 $1,571.22 Russian River Conservation Charge 160.41
Russian River Projects Charge 20.00
TOTAL SUPPLEMENTAL $1,751.63

SURPLUS
Non-Municipal / Municipal [4.11 (a)] $1,372.09 $1,372.09 $1,372.09 (120% of O&M Charge)
Town of Windsor $1,400.86
Beginning in FY22/23 all water delivered to Town of Windsor is charged at the Santa Rosa Aqueduct rate (4.17 (a)]. Town of Windsor pays all subcharges [4.13, 4.14, 4.15, and 4.16] on all water they divert from the Russian River using their equipment [4.17 (b)]. $1,400.86
The applicable section of the Restructured Agreement has been indicated in brackets. 5 FY 2025-26 BUDGET

SONOMA COUNTY WATER AGENCY
Operations and Maintenance Rate Computation

O & M REVENUE REQUIREMENT
FY25-26 ESTIMATED FISCAL YEAR EXPENDITURES $67,904,977
LESS:

LESS: 3,000
Depreciation Amortization 7,1,651
Investment Income, Interest on Pooled Cash, Charges for Services 2,000 RPS Pre-paid Expense - FY 0B109 Rate Reduction-One time only "Mandatory Prudent Reserve" charge
Ise of Fund Balance 0
Recycled Water funds (Sub-object 7277) taken from special reserv 3,238 Transfers Out 143,088
REVENUE REQUIREMENT (Net Expenditures) $45,
0 & M ACRE FOOT BASE
107.3
DELIVERIES:

LESS: 368.3
Marin Municipal 96.3
Surplus (Irrigation)
142.7

TOTAL BASE DELIVERIES
0& M RATE COMPUTATION:

Rate = Revenue Requirement - (Marin Municipal Deliveries x 1.11 x 0.92568 x Highest Prime F Total Deliveries - Surplus Deliveries - Marin Muni Deliveries = 45,556,088 - (4,300.00 x 1337.05) - (2,568.26 x 1337.05) 42,407.3 - 96.3 - 6,868.3
* = 1,029.16
2/26/2025
FY25-26
Proposed Water Rates
FY24-25 FY25-26
(Actual) (Proposed) % Change
O&M Charge 1015.39 1029.16 1.36%
Water Management Planning Sub-Charge 0.35 4.57 1206.1%
Watershed Planning/Restoration Sub-Charge 40.04 45.71 14.14% .... -r....i
Recy
Wat*Cycled Water Sub-Charge 0.00 0.14 N/A
Totaater Conservation Sub-Charge 59.55 63.83 7.20%
stal O&M Charge 1115.33 1143.42 2.52%
Sant
inta Rosa Aqueduct Rate
O&N
AqueM Charge 1115.33 1143.41 2.52%
Storeduct Facilities Capital Charges [4.6 e] 11.00 11.00 0.0% Comorage Facilities Capital Charge 14.71 31.47 50.09 59.20% TOTmmon Facilities Capital Charge [4.81 131.22 196.36 49.64% OTAL 1289.02 1400.85 8.68%
Petal
taluma Aqueduct Rate
O&N
Aque M Charge 1115.33 1143.41 2.52%
Storglueduct Facilities Capital Charges [4.6 e] 0.00 10.00 N/A Comorage Facilities Capital Charge [4.7] 31.47 50.09 59.20% Petal'mmon Facilities Capital Charge [4.8] 131.22 196.36 49.64% ToTtaluma Aqueduct Facilities Capital Charges [4.c 0.00 15.66 N/A OTAL 1278.02 1415.51 10.76%
Sonoma Aqueduct Rate
O&M Charge 1115.33฿ 1143.41 2.52%
Aqueduct Facilities Capital Charges [4.6 e] 34.90 34.90 0.0% Storage Facilities Capital Charge [4.7] 31.47 50.09 59.20% Common Facilities Capital Charge [4.8] 131.22 196.36 49.64% Sonoma Aqueduct Facilities Capital Charges [4.6 145.49 144.56 -0.64% TOTAL 1458.41 1569.31 7.60%
7 2/26/2025

SONOMA COUNTY WATER AGENCY

RUSSIAN RIVER CONSERVATION CHARGE COMPUTATION
FISCAL YEAR 2025-26
PROPERTY ASSESSMENT VALUES AS OF FY24-25:

TAX CODE ENTITY SECURED UNSECURED TOTAL VALUE
14000 Forestrille Co Water District 569,038,799 3,309,543 $572,348,342 42800 City of Cotati 1,458,559,933 34,271,987 1,492,831,920 43500 City of Petaluma 13,229,983,942 518,268,914 13,748,252,856 43800 City of Rohnert Park 7,486,674,091 166,266,919 7,652,941,010 44502. Cinent, Santa,Rosa, .... 31 834.749822.. 1075.28,2013.. 32 912032,833 44500 City of Santa Rosa 31,834,749,820 1,075,283,013 32,9105,200 45000 City of Sonoma 3,711,593,808 124,511,392 3,8?82,376 N/A Valley of the Moon Water District 4,666,087,332 21,195,044

4.0/94,537
TOTAL $62,956,687,725 $1,943,106,812 $64,81
Notes:
1 Total value of secured and unsecured property in service areas of Prime Water 794,537 Contractors of Sonoma County (see above) $64,8!
2016-17 Sonoma County tax rate per $100 of full cash value assesse 0.007 or payment of Warm Springs Dam Project Obligation
Total tax levied on citizens residing in service areas of Prime Water Contractors c $42,986 onoma County, i.e. (Line 1/100)x Line
Total acre feet of water delivered to Prime Water Contractors of Sonoma Coun ,320.40 xcluding North Marin and Town of Windsor) plus deliveries to Forestvil during the prior 12 month period ending March 31.

Б160.41
5 Total Russian River Conservation Charge per Acre Foot (Line 3/ Line 4) Russian River Projects Charge RR Conservation Charge
Historical calculations Historical calculations
For FY Calculated Actual Charge
06-07 17.02 $17.02 $48.33
07-08 21.4 $20.00 $52.70
08-09 25.08 $20.00 $58.44
09-10 24.68 $20.00 $57.70
10-11 24.4 $20.00 $74.62
12-13 20.38 $20.00 $72.08
13-14 14.72 $14.72 $63.30
14-15 8.72 $8.72 $63.90
15-16 12.39 $12.39 $69.38
16-17 12.96 $12.96 $78.73
17-18 13.08 $13.08 $105.78
18-19 9.13 $9.13 $109.75
19-20 8.34 $8.34 $102.09
20-21 8.68 $8.68 $106.12
21-22 10.63 $10.63 $115.94
22-23 13.92 $13.92 $115.36
23-24 15.79 $15.79 $137.33
24-25 20.37 $20.00 $159.28
25-26 26.85 $20.00 $160.41
8 2/26/2025

SCHEDULE OF WATER DELIVERIES BY AQUEDUCT
PAST 36 MONTHS / 12 MONTHS AVERAGE
DELIVERING AQUEDUCT Monthly
Santa Rosa Petaluma Forestville Sonoma Total
Jan-22 1073.2 1423.2 18.6 205.2 2,720.2
Feb-22 3,118.1
Mar-22 3,666.4
Apr-22 LLE
3,615.8
May-22 4,984.0
May-22 4,984.0
Jun-22 4,318.5
Jul-22 3,348.0
Aug-22 3,942.7
Sep-22 3,225.2
Oct-22 3,285.8
Nov-22 2,814.8
Dec-22 2,807.7
Jan-23 2,750.7
Feb-23 2,225.2
Mar-23 2,168.1
Apr-23 1,726.0
May-23 3,642.6
19 Jun-23 4,094.8
18 Jul-23 5,164.4
Aug-23 4,997.1
16 Sep-23 4,243.2
Oct-23 4,467.7
Nov-23 2,956.7
Dec-23 2,407.7
2,663.4
2,146.4
2,044.8
2,613.3
3,327.6
4,284.6
574.4 6,095.3
400.2 5,048.5
427.5 5,267.6
3 + + 4,827.5
1 1168.11 3,096.4 |
Total Deliveries 49,055.4 127.221.8
3-Year Annual Average 16,351.8 22,139.2 42.407.3
Past 12 Months 17,201.9 23,173.0 371.2 3,784.2 44,530.2 Total Deliveries 49,055.4 66,417.7 1,054.3 10,694.4 127,221.8 Less: North Marin 16,070.9 16,070.9
Marin Municipal 20,604.8 20,604.8
Sonoma Co. Deliveries 49,055.4 29,742.0 1,054.3 10,694.4 90,546.1 3-Year Annual Average 16,351.8 9,914.0 351.4 3,564.8 30,182.0 2/26/2025
9 SONOMA COUNTY WATER AGENCY SONOMA COUNTY WATER AGENCY SCHEDULE OF ACTUAL PRIOR 12 MONTHS WATER DELIVERIES IN ACRE FEET (BY CUSTOMER TYPE) ACTUAL WATER DELIVERY DISTRIBUTION BY AQUEDUCT (ACRE FEET) JANUARY THROUGH DECEMBER PRIOR 12 MONTHS
Jan-24 F0b-24 Mar-24 Apr-24 May-24 Jun-24 JuL24 Aug-24 SoD-24 D0c-24 TOTAL Santa Rosal City or Santa Rosa DELIVERED TO:

1.885.1 850803 8 0 18 see manen....
1,845.1 0.0 1.121,6
469.0 401.8 357.1 7515 471:4 7,313.7 CITY OF SANTA ROSA AI 973.1 124.0 3SC.7 7.094.5 Jan 2024 965.5
2754 169.7 206.5 2,884.3 1.031.8

32.3 33.3 225.2
1,328.6
17333 38.5 38.9 522.4 111.9 1,536.9

93.3 83.1 126.2 123.3 185 1L 1.1034 2 078.3
154.9 1,772.5 1,425.0 378,5 1.731.2
2934 20305 1,303 389 2216 382 49904 3.925.7 4,417.9 3,8598 2,399.7 2.617.338.171.7 1,6892 OTHER AGENCY CUSTOMER 1.845.1
Cal-American Water 1,352.6 336.9 1,595.0
2 Penngrove Water Co MERS 1,408.5
4 Lawndale Mutual 2.6 1.258.1

11.8 106.5
Konwood Village Water Co 10.2 183.0 8421 2,745.1
19 2.1 0.4 22084803 TOTAL SANTA ROSA 13.4495

22.6 18.9 24.3 37-2 313.7 7,313.7

0.7 1.1 OTHER PRIME CONTRACTORS (B) 7.094.5

0.0 0.0 NORTH MEN WATER DISTRICT 0.0 2,884.3

9.6 63 590.9

63.8 52.1 46.5 67.9 80.4 CITY OF RCHNER: PARK 522.4
CITY OF COTATI 42 1,799.0 1,799.0
522.4 1.772.5 1.772.5
1565 21.5 966.7 693.6 843.91 626.1 395.9 5.106.6 830.2 3571,4 21.977.1 2 Frigation Petaluma Aq 575.5_830.2 6.316.5 38.171.7

0.0 I TOTAL SURPLUS CUST. TOTAL DELIVERIES TO PRIMES 12.0250 [091.5) (7.094.5) TOTAL DELIVERIES 2.3 3.5 51.7 180,2 LESS NORTH MARIN 735.8 6.316.51 31.077.3

2.663.4 2,146.4 2,044.3 2,613.3 3,3276 4,284.6 6.095.3 5.048.5 4,827.5 3,114.7 3.096.444,530.2 TOTAL SOVONA COUNTY DELIVERIES| 14,025.0 2/26/2025
FY 2025-26 BUDGET
Water Transmission System Agency Fund
ESTIMATED WATER DELIVERIES AND WATER SALES - O&M plus Surcharges

ESTIMATED TATED

REVENUE CATEGORY ACRE FEET ESTIMATED ESENUE

DELIVERED RATES RE

WATER SALES - O&M
482,799
1 PRIMES without Subcharges 34,477.4 1,029.16
707,581
OTHER AGENCY CUSTOMERS 965.3 1,768.92
749,321
MARIN MUNICIPAL (OFF-PEAK) 4,300.0 1,337.05
433,901
4 MARIN MUNICIPAL (SUPPLEMENTAL) 2,568.3 1,337.05
121,084
5 SURPLUS CUSTOMERS 96.3 1,257.83
494.686
TOTAL WATER SALES - O&M 42,407.3 N/A
Note: MMWD rate adjusted per Amended MMWD Water Supply Agreements Effective 7/1/15.

ESTIMATED TATED

REVENUE CATEGORY ACRE FEET ESTIMATED ESENUE

DELIVERED RATES RE
WATER SALES - Sub-charges
194,000
1a Water Management Planning Sub-charge [4.13] 42,407.3 4.57 938,370
1b Watershed Planning/Restoration Sub-charge [4.14] 42,407.3 45.71 6,000
1c Recycled Water & Local Supply Sub-charge [4.15] 42,407.3 0.14 706,900
1d Water Conservation Sub-charge [4.16] 42,407.3 63.83
TA, TUI. NIn y7,845,270
2/26/2025
FY 2025-26 BUDGET
Water Transmission System Agency Fund
CANTA DOCA ANIELICT ECTIMATEN INATED NEI IVERIES AND INATED CAIECAMnue Cumhaunno SANTA ROSA AQUEDUCT ESTIMATED WATER DELIVERIES AND WATER SALES - O&M plus Surcharge! ESTIMATED ¡TIMATED

REVENUE CATEGORY ACRE FEET ESTIMATED EVENUE

DELIVERED RATES
WA
WATER SALES - O&M 16,828,628
SANTA ROSA AQUEDUCT 16,351.8 1,029.16
Sub-Object 4175, 4176, 4177, and 4178
ESTIMATED ¡TIMATED

REVENUE CATEGORY ACRE FEET ESTIMATED EVENUE

DELIVERED RATES
WA
WATER SALES - Sub-charges
74,804
1a Water Management Planning Sub-charge [4.13] 16,351.8 4.57 747,415 Watershed Planning/Restoration Sub-charge (4.14) 16,351.8 45.71 2,314 Recycled Water & Local Supply Sub-charge (4.151 16,351.8 0.14 1,043,752 Water Conservation Sub-charge (4.16] 16,351.8 63.83
$1,868,285
TOTAL WATER SALES - Subcharges 16,351.8 N/A

ESTIMATED TITIMATED

REVENUE CATEGORY ACRE FEET ESTIMATED EVENUE

DELIVERED RATES
CAPITAL CHARGES 179,870
Aqueduct Facilities Capital Charges [4.6 e] 16,351.8 11.00 BO
BOND AND LOAN CAPITAL CHARGES 819,101
Storage Facilities Capital Charge (4.7] 16,351.8 50.09 3,210,761 Common Facilities Capital Charge (4.8] 16,351.8 196.36
Petaluma Aqueduct Facilities Capital Charges (4.6 b] 16,351.8 0.00 Sonoma Aqueduct Facilities Capital Charges [4.6 b] 16,351.8 0.00 $4,209,732
.__-_- ...-
TOTAL ESTIMATED REVENUE $22,906,645
2/26/2025
FY 2025-26 BUDGET
Water Transmission System Agency Fund
PETALUMA AQUEDUCT ESTIMATED WATER DELIVERIES AND WATER SALES - O&M plus Surcharges ESTIMATED ¡TIMATED

REVENUE CATEGORY ACRE FEET ESTIMATED EVENUE

DELIVERED RATES
WA
WATER SALES - O&M 22.784,826
PETALUMA AQUEDUCT 22,139.2 1,029.16
Sub-Object 4175, 4176, 4177, and 4178
ESTIMATED ¡TIMATED

REVENUE CATEGORY ACRE FEET ESTIMATED EVENUE

DELIVERED RATES
WA
WATER SALES - Sub-charges
101,280
1a Water Management Planning Sub-charge (4.13] 22,139.2 4.57 1,011,950 Watershed Planning/Restoration Sub-charge [4.14] 22,139.2 45.71 3,132 Recycled Water & Local Supply Sub-charge 14.15] 22,139.2 0.14 1,413,170 Water Conservation Sub-charge (4.16] 22,139.2 63.83
$2,529.532
TOTAL WATER SALES - Subcharges 22,139.2 N/A
ESTIMATED ¡TIMATED

REVENUE CATEGORY ACRE FEET ESTIMATED EVENUE

DELIVERED RATES
CAPITAL CHARGES 221,392
Aqueduct Facilities Capital Charges (4.6 e) 22,139.2 10.00 BOND AND LOAN CAPITAL CHARGES 1,109,008
Storage Facilities Capital Charge [4.7] 22,139.2 50.09 4,347,154 Common Facilites Capital Charge (4.8] 22,139.2 196.36 346,697 Petaluma Aqueduct Facilities Capital Charges [4.6 b] 22,139.2 15.66 Sonoma Aqueduct Facilities Capital Charges (4.6 b] 22,139.2 0.00 $6,024,251
...-
$31,338,609
2/26/2025
FY 2025-26 BUDGET
Water Transmission System Agency Fund
CAN ALIENT ECTIMATE IATED NEI IVEDIES AND MATED CAI EC. NOM allo Countarano SONOMA AQUEDUCT ESTIMATED WATER DELIVERIES AND WATER SALES - O&M plus Surcharges ESTIMATED ¡TIMATED

REVENUE CATEGORY ACRE FEET ESTIMATED EVENUE

DELIVERED RATES
WA
WATER SALES - 0&M 3,668,743
SONOMA AQUEDUCT 3,564.8 1,029.16
Sub-Object 4175, 4176, 4177, and 4178
ESTIMATED ¡TIMATED

REVENUE CATEGORY ACRE FEET ESTIMATED EVENUE

DELIVERED RATES
WA
WATER SALES - Sub-charges
16,308
1a Water Management Planning Sub-charge [4.13] 3,564.8 4.57 162,941 Watershed Planning/Restoration Sub-charge (4.14) 3,564.8 45.71 504 Recycled Water & Local Supply Sub-charge (4.15) 3,564.8 0.14 227,544 Water Conservation Sub-charge [4.16] 3,564.8 63.83
$407,297
TOTAL WATER SALES - Subcharges 3,564.8 N/A
ESTIMATED ¡TIMATED

REVENUE CATEGORY ACRE FEET ESTIMATED EVENUE

DELIVERED RATES
CAPITAL CHARGES 124,411
Aqueduct Facilities Capital Charges [4.6 e) 3,564.8 34.90 BOND AND LOAN CAPITAL CHARGES 178,569
Storage Facilities Capital Charge (4.7] 3,564.8 50.09 699,965 Common Facilities Capital Charge [4.8] 3,564.8 196.36
Petaluma Aqueduct Facilities Capital Charges [4.6 b] 3,564.8 0.00 515,315 Sonoma Aqueduct Facilities Capital Charges (4.6 b] 3,564.8 144.56 $1.518,260
•. -
TOTAL ESTIMATED REVENUE $5,594,300
2/26/2025
FY 2025-26 BUDGET

BEGINNING AND ENDING CASH SUMMARY
Section Title: Water Transmission System Agency Fund
Fund/Department No: 4420533040100]
Actual Estimated Adopted Requested Percent
Account Title 2023-2024 2024-2025 2024-2025 2025-26 Difference Change BEGINNNG FUND BALANCE 12,327,122 14,640,955 6,610,937

REVENUES

USE OF MONEV I DONDERTY
(25.77%)
963,245 285,142 285,142 211,651 (73,492) N/A
0 0 0 N/A
860,744 0 N/A
0 0 N/A
01 Rent - Real Estate 0 0 0
(25.77%)
SUBTOTAL 1,823,989 285,142 285,142 211,651 (73,492)
INTERC
42282: GOVERNMENTAL REVENUES N/A
42284:82 State CalOES Disaster Funding 0 N/A
42358:84 State Cal OES Admin Allowance 0 0 N/A
42441i58 State Other Funding N/A
42443.41 Federal FEMA Disaster Funding N/A
42461.43 Federal FEMA Admin Allowance 0 N/A
42610.61 Federal Other Funding 0 N/A
42621:10 Other Governmental Agencies 0000
0 N/A
42701;21 North Marin Water District 0 N/A
01 Revenue Appl - PY Intergovmtl 0 NIA

SUBTOTAL
CHARG
45062 RGES FOR SERVICES N/A
45065162 Construct/Bidg Permit Rvw Svcs 0 0 0 N/A
45223/65 Inspection Fees 0 20,000 0 0.00%
45301:23 Sewer/Water Hook up Fees 50,004 20,000 20,000 0 N/A 45314:01 Charges for Services (65,858) 0 0 0.00%
45315:14 Sale - Power 0 100,000 100,000 100,000 0 1.77% 45316:15 Sale - Water, Wholesale 37,926,149 45,686,001 45,686,001 46,494,686 808,685 6.15% 45323;16 Water Conservation 2,270,600 2,550,140 2,550,140 2,706,900 156,760 51.90% 45324:23 Common Fac Rev Bond Chg 4,233,976 3,889,158 3,889,158 5,907,651 2,018,493 61.61% 45325;24 Storage Fac Rev Bond Chg 883,734 932,557 932,557 1,507,069 574,513 0.58% 45326;25 Sonoma Aqueduct Rev Bond Chg 526,308 512,337 512,337 515,315 2,979 N/A 45327:26 Potaluma Apradict Rev Royd Chr .. 346607 346 607 3.51% 45328 Petaluma Aqueduct Cap Chg 30,658 .... 121,766 121,766 N/A 45329 Sonoma Aqueduct Cap Chg 161,085 116,752 116,752 118,191 1,438 1.23% 45330 North Marin Rev Bond Chg 454,484 492,184 492,184 796,359 304,175 61.80% 45331 Water Mgmt Plan/Restore Chg 15,000 15,000 194,000 179,000 1193.33% 45332 Watershed Plan/Restore Chg 1,509,849 1,714,950 1,714,950 1,938,370 223,420 13.03% 45333 Recycled Water & Local Supply 6,000 6,000 N/A
45401 Revenue Appl PY Chgs for Svcs N/A
SUBTOTAL 48,352,664 -56,328,487 56,328,487 61,082,924 4,754,437 8.44% 15 2/26/2025
Section Title: Water Transmission System Agency Fund
Fund/Department No: 44205 [33040100
Actual Estimated Adopted Requested Percent
Account Title 2023-2024 2024-2025 2024-2025 2025-26 Difference Change

MISCELLANEOUS REVENUES
46027 Insurance Claims Reimbursement 139,834 0 0 0 NIA
16029 Donations/Contribution: 0 0 0 N/A
6040 Miscellaneous Revenue 4,961 0 0 N/A
0 0 N/A
46050 Cancelled/Stale Dated Warrants 2,458 0 N/A
46200 Revenue Appl PY Misc Revenue 6,542 N/A
46205 PY Revenue - Charges for Servi N/A
46215 Other Grants N/A
:15 Other Grants 0 0 0
N/A
SUBTOTAL 13,961 139,834
OTHER
47002 ER FINANCING SOURCES NIA
47101/02 Sale of Capital Assets N/A
47102 01 Transfers In - within a Fund 0 0 N/A
02 Transfers In - btw Govtl Funds 0 0 0

SUBTOTAL
SPECIA
48004 CIAL ITEMS N/A
104 Residual Equity Transfers 0
SUBTOTAL 0 0

8.27%
TOTAL REVENUES 50, 190,614 56,753,463 56,613,629 61,294,575 4,680,946 EXPE

SERVIP ENDITURES
51021 VICES AND SUPPLIES N/A
51031/21 Communications Expense 0 0 N/A
51032131 Waste Disposal Services 5.71%
51041132 Janitorial Services 7,104 7,400 N/A
51042141 Insurance - Liability 0 0 0 (20.00%)
51061142 Insurance - Premiums 0 4,000 6.78%
5107161 Maintenance - Equipment 1,784,342 2,664,400 N/A 51072/71 Maintenance - Bldg & Improve 60,687 0 0 N/A
51077/72 Landscaping Services N/A
51083177 Maint-Infrastructure N/A
51205 Advertising/Markeung Svc TYy 5,000 5,000 3,000 0.00% 51209 Information Tech Svc (non ISD) 1,951 3,000 3,000 4,500 1,500 50.00% 51211 Legal Services 18,576 50,000 50,000 50,000 0.00%
51212 Outside Counsel - Legal Advice 286 2,500 2,500 2,500 0.00% 51214 Agency Extra/Temp Help N/A
51221 Medical/Laboratory Services 5,546 15,000 15,000 10,000 (5,000) (33.33%) 51225 Training Services 00 N/A
51226 Consulting Services 1,749 N/A
51230 Security Services 2,000 2,000 2,000 00

0.00%
51231 Testing/Analysis 172,939 240,000 240,000 250,000 10,000 4.17% 51241 Outside Printing and Binding 1,164 1,500 1,500 2,000 500 33.33% 51242 Bank Charges 50 50 50 0.00%
51243 Filing Fees 150 N/A
51244 Permits/License/Fees 162,675 90,000 90,000 95,510 5,510 6.12% 16 2/26/2025
Section Title: Water Transmission System Agency Fund
Fund/Department No: 44205 33040100|
Actual Estimated Adopted Requested Percent
Account Title 2023-2024 2024-2025 2024-2025 2025-26 Difference Change 51249 Other Professional Services N/A
51301 Publications and Legal Notices 0° 0 N/A
51401 Rents and Leases - Equipment 217,479 400,000 400,000 400,000 0 0.00% 51402 Rents and Leases - Heavy Eqt 577,824 400,000 400,000 575,000 175,000 43.75% 51421 Rents and Leases - Bldg/Land 2.191349 3,991 3,991 N/A 51509 SCADA System Contributions 877,390 2,191,349 2,545,700 354,351 16.17% 51601 Training Services 24,545 20,000 20,000 15,000 (25.00%) 51602 Business Travel/Mileage (37) 6,000 6,000 6,000 0.00% 51605 Private Car Expense 1,557 750 750 750 0.00%
51801:05 Private Car Expense 1,557 750 N/A
51803:01 Other Services 00 (20.46%)
0 51902:03 Other Contract Services 8,380,773 19,597,668 12,031,260 (2,461,839) 0.00% 51911102 Telecommunication Usage 58,258 75,000 75,000
51917/11 Mail Services 0 150 150 150
51921/17 District Operations Chgs 20,217,209 20,820,463 20,206,914 1,022,470 9.55% 52021/21 Equipment Usage Charges 1,619,248 1,100,000 1,100,000 105,000 0.00% 52031121 Clothing, Uniforms, Personal 8,869 8,000 8,000 0 0.00% 52041131 Food 500 500 500 N/A
52042141 Household Supplies Expense 0 0 0 N/A
52043142 Janitorial Supplies 411 0 0 0.00%
52061143 Safety Supplies/Equipment 44,156 6,000 0 0.00% 52063|61 Fuel/Gas/Oil 887 75,000 0.00%
52071163 Vehicle Parts 0 500 0 80.79%
52072/71 Materials and Supplies Expense 148,082 35,000 28,276 (0.06%) 52081/72 Chemicals 1,134,472 1,200,000 (671) (70.00%)
52091181 Medical/Laboratory Supplies 16,699 50,000 (35,000) 18.17% 52101191 Memberships/Certifications 38,199 49,775 8,175 N/A 52111 01 Other Supplies 0 0 0 0.00%
5211211 Office Supplies 6,162 7,500 0 0.00%
52114 12 Office Furniture/Fixtures 0 3,500 0.00%
52115 14 Freight/Postage 1,000 0 0.00%
52117 15 Books/Media/Subscriptions 1,532 500 500 0.00%
52141 17 Mail and Postage Supplies 6,103 5,000 0 0.00%
52142 41 Minor Equipment/Small Tools 141,764 200,000 0.00% 52143 42 Computer Equipment/Accessories 59 2,500 0 75.44% 52147 43 Computer Software/Licensing Fees 12,607 30,000 22,633 N/A 52162 47 SBITA Payment Adjustments 0 0 N/A
52171 62 Special Department Expense 0 N/A
52191 71 Water Conservation Program 0 0.00%
52192 91 Utilities 3,404 3,500 3,500 3,500 0 N/A
52193 92 Utilities - Gas/Propane 35 0 0 13.00%
52194 93 Utilities - Electric 4,025,593 4,250,000 552,500 N/A 94 Vities- Water 0
09,10V,040 00, 000,440 140, v04,° (0.11%)

OTHER CHARGES
53103 Interest on LT Deb 0 N/A
53104 Other interest Expense 0 N/A
0 N/A
3,433 83,000 83,000 83,000 0.00%
7,206,400 7,486,000 7,486,000 7,486,000 0.00%
53403 Loss - Disposed Capital Asset 0 0 N/A
0 0 N/A
B0 Conson Manchun A 125,000 N/A
0 N/A
SUBTOTAL 7.209,833 7,694,000 7,569,000 7,569,000 0.00%
2/26/2025
Section Title: Water Transmission System Agency Fund
Fund/Department No: 44205 33040100
Actual Estimated Adopted Requested Percent
Account Title 2023-2024 2024-2025 2024-2025 2025-26 Difference Change

FIXED ASSETS
19820 Machinery and Equipment 0 N/A
19822 Mobile Equipment 0 N/A
19824 Computer Equipment 0 N/A
19831 CIP - Bldg & Impr 0 N/A
19832 CIP - Infrastructure N/A
19840 Work in Progress - Eqt 0 0 N/A
19841 Work in Progress - Intang 747,549 141,300 645,570 504,270 356.88% 19851;41 wotk in"Progress"= intang" 141,34y 141,300 090,3 гy SU4,210 N/A 51 Intangible Assets - Non-amor 0 0
356.88%
SUBTOTAL 747,549 141,300 645,570 504,270
57011 ER FINANCING USES 37.50%
57012111 Transfers Out - within a Fund 10,169,217 10,522,486 10,522,486 14,468,238 3,945,752 N/A 112 Transfers Out -btw Gotl Fund 0 37.50%
APPRO SUBTOTAL 10,169,217 10,522,486 10,522,486 14,468,238 3,945,752 55011 ROP. FOR CONTINGENCIES N/A
111 Appropriation for Contingency 0 0 0 NIA

SUBTOTAL
REMIBI
58010IBURSEMENTS NIA
110 Reimb. - General 0
NIA

SUBTOTAL
ADMIN.
59004|IN. CONTROL ACCOUNT N/A
59005/04 Administrative Control Account 0 N/A
105 Admin Control Acct Clearing 00
NIA
SUBTOTAL 0

6.93%
TOTAL EXPENDITURES 57,159,697 72,352,481 63,503,959 67,904,977 4,401,018 Adjustr
Deprestments to Reserves/Encumbrances:

Dona preciation 7,209,833 7,569,000 7,569,000
Outstinated Asset (Caltrans) 0
Capititstanding Encumbrances - Net Change 3,153,546 0
Gain/pitalized Interest
Unreain/l oes on dispaçal of fived, accote
Change in Prepaid Expense
Change in Prudent Reserve
Post audit adjustments - Payables (254,731)
Use of Fund Balance
Move CIP balance between funds 33,987
Rounding 1
ENDING FUND BALANCE 14,640,955 6,610,937 7,569,535
Operations and Maintenance 44205 Fund Balance Reserve Goal 11,466,935 Over/(Under) Goal (3,897,400)
18 2/26/2025
Water Transmission System Agency Fund
Major Services & Supplies Expenditure Items
Fund/Department No: 44205 33040100
Actual Adopted Requested Percent
FY23-24 FY24-25 FY25-26 Difference Change
51061 Maintenance - Equipment 1,784,342 2,495,200 2,664,400 6.78% ratese atibulable to increased costs of the Pump 9 replacement ofset y 5270,00 in projects that have been defered to reduce the 51211 Leqal Services 18,576 50,000 50,000 0 0.00%
Reflects five year average expenditures.

Sects five year average expenditures.

4.17%
Increa 51231 Testing/Analysis 172,939 240,000 250,000 10,000 splastics
nd Pirease associated with expanded sampling and analysis tied to the Santa Rosa Plain Wells Projects as well as additional | Perfluoroalkyl/Polyfluoroalkyl Substances (PFAS) testin 51 43.75%
Increa 51402 Rents and Leases - Heavy Eqt 577,824 400,000 575,000 175,000 rease to align with FY23/24 actuals.
51 16.17%
Increa 51509 SCADA System Contributions 877,390 2,191,349 2,545,700 354,351 rease attributable to water transmission system's share of SCADA maintenance expenses and capital project costs. 51 -20.46%
51803 Other Contract Services 8,380,773 12,031,260 9,569,421 (2,461,839) Decre
crease attributable to deferring cathodic protection and tank recoats. 51 5.06%
Increa 51917 District Operations Chgs 20,217,209 20,206,914 21,229,384 1,022,470 ase. The majorirease is attributable to an increase in labor costs for maintenance projects, offset by projects deferred to reduce the rate in jority of this increase is due to negotiated labor rates.

9.55%
Reflec 51921 Equipment Usage Charges 1,619,248 1,100,000 1,205,000 105,000 flects five year average expenditures.
52 -0.06%
52072 Chemicals 1,134,472 1,200,000 1,199,329 (671)
Costs
sts expected to remain stable after several years of large increases.

13.00%
Power 52193 Utilities - Electric 4,025,593 4,250,000 4,802,500 552,500 distribwer demand and costs expected to increase roughly 13%. The maiority of this increase is associated with increased transr 19 2/26/2025
2025-26
Water Transmission System Agency Fund
AMOUNT
51061 Maintenance - Equipment
O&M Routine Maintenance
1 Electrical/Instumentation/SCADA Equipment and Supplies 400,000 2 Meter and Backflow Equipment and Supplies 150,000
3 Plains Wells Equipment and Supplies 50,000
4 Production and Treatment Equipment and Supplies 220,000 5 ransmission and Storage Equipment and Supplie 300,000 5 ransmission and Storage Equipment and Supplie 30000
!
6 Warehouse Equipment and Supplies 1000
: 7 Warm Springs Dam Equipment and Supplies
Water Operations Equipment and Supplies 1000
8 O&M Projects
9 Electric Vehicle Charging Station for Water Ed 1900
10 Pump 9 Replacement 1,20
1 Emergency Management Program/Security 000
1 11 Emergency Inventory Procurement 29000
12 TAC Emergency Coordination Committee (Grand Jury)
1 Other 000
1 13 Santa Rosa Plain Well Monitoring Program (SW Wells) 14 Wohler Mirabel Groundwater Monitoring
$ 2,6100
UNT
AM
: 51509 SCADA System Contributions
SCADA System Contributions 2,54,00
$ 2,54
20 2/26/2025
51803 Other Contract Services AMOUNT
O&M Routine Maintenance
1 Various Routine Contracts 465,000
Implementation
2 As-Needed Dive Services 60,000
3 Asset Management Program 250,000
4 Cathodic Protection - Maintenance 50,000
5 Cathodic Protection - Site Assesment and Design Support 50,000 6 Cathodic Protection - SR/Cotati 355.000
6 Cathodic Protection - SR/Cotati 35000
1 7 Hazardous Materials Management 5000
: 8 Regional Water Supply Resiliency Implementation 25000 1 9 Riverfront Park Maintenance - Regional Parks 10000
110 Lease Agreements 3548
1 11 Tank Maintenance Program 1,40800
112 Tank Recoating Program 3,75000
13 TPW Pavement Preservation Program 2
1 Advocacy 00O
114 Community Outreach Program 4000
1 15 IRWM North Coast 7000
16 Government Affairs - Legislative Program 15
1 Studies/Planning 840
1 17 Arc Flash Studies 11733
118 Cathodic Protection Assessment 98000
219 Natural Hazard Reliability Study 2000
2 20 Planning Studies 3000
2 21 System Monitoring Program 2000
222 Transmission System Condition Assessments 20000
2 23 Water System Comprehensive Master Plan 40000
224 Watershed Water Quality Study - LBNL 21500
2 25 Watershed Water Quality Study - USGS 18000

2.26 ...Wohler-Mirabel. Elood Resilience Alternatives, Evaluationy u... -1,000 $ 9,569,421
21 2/26/2025
51803 Other Contract Services & 51509 SCADA System Contributions Project Information FY25-26
Asset Management Program 250,000
The primary objectives of Sonoma Water's Asset Management Program (AMP) are to improve the cost-effective management of assets throughout their life cycle, promote data sharing and interconnectivity, and demonstrate fiscal responsibility. Phase 1 included review of Sonoma Water's current asset management practices, development of an AMP vision and charter, asset management framework. Phase 2 included condition assessment of the water production facilities (Mirabel & Wohler); assessment of the water tanks, booster stations, and other miscellaneous water facilities; and of several of the wastewater treatment facilities. In addition, the new Computerized Maintenance Management System (CMMS) software implementation is underway and is now live.

To date the AMP has delivered: Ascet Mananement Framework Terh Memn: State of the Ascets Terh Mamns: Ascet Manaçdate the AMP has delivered: Asset Management Framework Tech Memo; State of the Assets Tech Memos; Asset asses:nagement Implementation Plan (AMIP) Report; Asset Management Program Statement of Commitments; 24/25 jessment of the water and wastewater facilities; and have begun the implementation of the CMMS software. In FY AMP, 25, Phase 3 will involve integrating the recommendations during Phase 2 into the full roll-out of the enterprise-wide additiap, implementing the selected CMMS software, furthering data management and integration and continuing with continitional condition assessments of water and wastewater facilities. Future work for FY 24/25 and 25/26 will involve requirtinued integration with the CMMS software. Additionally, there will be a focus on implementing the AMP. This may Catho 5,000
Provicthodic Protection - SR/Cotati
Russiovide improvements to upgrade the cathodic protection system along the existing Santa Rosa Aqueduct and protecssian River-Cotati Intertie. The project includes designing and constructing a new corrosion protection system to sefulitect the pipeline from corrosion and monitor the state of the pipelines. The corrosion protection system will have if the sful life of approximately 50 years, and will allow for remote assessment and data collection to quantify the conditio complihe pipeline and state of the cathodic protection system. The project will be constructed in two phases with a npleted project that consists of 27 corrosion protection well sites and 51 test stations.

SonorFy 21-22, design efforts commenced and CEQA environmental review was completed for the project. In FY23-24, anticinoma Water reengaged design consultants to develop 90% plans and specifications for the Phase 1 Project and desigricipated advertisement before the end of FY 24/25. Work completed in FY 23/24 and 24/25 includes electrical sign, coordination and design approvals from PG&E, and land surveys of rectifier and test station locations. and dork in FY 25/26 will focus on acquisition of necessary rights-of-way to construct phase 2, environmental permitting, Coller developing plans and specifications for the remaining rectifier and test station locations.

Sononllector 5 Structural Evaluation
within noma Water has conducted preliminary structural evaluations of the Collector buildings and hoist support structures Collechin to support a proposed hoist load capacity increase from 10 tons to 12.5 tons. Preliminary analyses suggest the lector 5 floor slab does not appear to be adequate for the proposed 12.5 ton hoist load or the original building loac In FY
sophisy 23/24, a preliminary structural evaluation was conducted. In FY 24/25, Sonoma Water plans on conducting more improbhisticated and detailed structural evaluation possibly including finite element modeling to determine what MP'egrams man be needed to meet loadina demands.

The LHMP program planning provides for the maintenance and update to the Local Hazard Mitigation Plan (required or FEMA funding) and the preliminary development of mitigation project concepts for the purposes of preparing gran pplications and refining projected costs of proiects associated with the Natural Hazard Reliability Mitigation Progran FY 22-23 funding was used to commence development of the 2023 LHMP Update. In FY23-24, the 2023 draft HMP Update was finalized and was submitted to CalOES for approval. In FY24-25 Sonoma Water expects to receive CalOES and FEMA approval, and funding may be needed to address comments prior to approval as well as to begin discussions and any necessary coordination with the County's Multijurisdictional LHMP update. 22 2/26/2025
51803 Other Contract Services & 51509 SCADA System Contributions Project Information FY25-26
Regional Water Supply Resiliency Implementation FY25-26 Retail water providers to over 600,000 people in Sonoma and Marin Counties are regionally connected through existing water supply infrastructure. Along with purchasing wholesale water from the Sonoma County Water Agency, each retail provider also has local supplies which are used to meet the demands of their customers. Although these systems are connected, they are not operated or managed in a coordinated manner, especially in times of water shortage.

Funds expended between FY 19/20 and FY24/25 for the Regional Water Supply Resiliency Study were used to build a decision support model to evaluate the region's resiliency to drought, and natural hazards such as seismic events wildfires and flooding. Based on modeling scenarios completed for the development and evaluation of projects and strategies to improve the regions water supply reliability during periods of water supply shortage due to drought and improsmic events, development of regional water banking strategies were identified as priority initiatives to pursue to ),000 priorityrove the regions water supply resiliency. Funds budgeted for FY 24/25 and FY 25/26 will be used to implement nplebrity recommendations from the Regional Water Supply Resiliency Study to develop a Regional Water Ban cilitiblementation Strategy, which would provide a mechanism to integrate the most significant regional water storag grounilities (Lake Sonoma, Santa Rosa Plain groundwater basin, Sonoma Valley groundwater basin, Petaluma Valley transnundwater basin, Lake Stafford, and reservoirs operated and managed by Marin Water), using Sonoma Water's or grohsmission system as the backbone. Surplus surface water during wet periods could be stored in surface reservoirs improgroundwater basins and subsequently extracted during critical drought periods or emergencies thus providing Strate roved resilience and reliability to the region. The scope of work will include (1) develop a Regional Water Bank suppoategy; (2) support participant and partner benefit statements; (3) develop and apply regional water bank model; (4) impler port engagement and outreach; (5) develop funding approach and implementation schedule; and (6) prepare ›lementation strategy report.

SCAD 5,700
The SADA System Contributions 2
mainte SCADA System Contributions line-item funds the Water Transmission System's portion of routine operations and projecintenance of Sonoma Water's SCADA system (including SCADA staff labor) as well as capital improvement jects.

Routir
perforutine work to operate and maintain the SCADA system on an annual basis includes monitoring system performance, trainin forming software updates and patching, maintaining and replacing hardware, troubleshooting issues, providing user currenning and support, assessing and revamping programming standards to accommodate new/modified processes and rent technologies, and implementing new standards to streamline maintenance and operations.

In add
SCADaddition to annual, routine work, Sonoma Water has undertaken several capital improvement projects to improve the DurinADA system over the last few years. These projects are identified in Sonoma Water's SCADA Master Plan. softwaring FY21/22, we completed much of the background work necessary to replace Sonoma Water's entire SCADA that lotware system. This included documenting the logic embedded in the existing SCADA system interface, duplicating new s't logic into a new PLC, and creating new interface graphics. In FY22/23, we began live, side-by-side testing of the over tiv system software and completed the majority of reporting requirements for the new system. In FY23/24, we cut- optimiar the majority of our sites to the new SCADA system and implemented additional improvements including imizing system performance and hardware replacements and upgrades.

In FY2
We al=y24/25, we completed migration to the new SCADA system which includes historian, dashboards, and reporting. replac, alan hacay. an artancisa nanning affort ta ranlara tha, legacy SADA rarin, sustam. Tha SCANA radio sistom TCOMM to improve performance and security of Sonoma Water's SCADA radio system. We also kicked-off a separate project for SCADA Network upgrades, including a focus on firewalls and related security improvements.

In FY25/26, we plan to continue making substantial investments in network equipment (firewalls, switches, routers, power supplies, and new dedicated ISP connections), and will begin replacement of legacy SCADA radio equipment. 23 2/26/2025
51803 Other Contract Services & 51509 SCADA System Contributions Project Information FY25-26
Tank Maintenance Program 1,400,548
Sonoma County Water Agency (Sonoma Water) owns and operates 18 water storage tanks with a total combine capacity of 128.8 million gallons as a part of the water transmission system that provides clean drinking water to approximately 600,000 residents in nine major cities and water districts within Sonoma and Marin counties. Maintaining these tanks is critical. This program covers a 10-year agreement for maintenance services with a Service Provider.

In FY 24/25 Enhanced Washout Cleaning and Inspections were conducted on 2 tanks, and Visual Inspections were conducted on 12 tanks. FY25/26 funding will be used to conduct Enhanced Washout Cleaning and Inspections on 2 tanks and Visual Inspections for remaining tanks.

Tank |
3,300
Waterik Recoating Program
operater storage tanks are an integral component of Sonoma Water's transmission and supply system and provide Water rational flexibility and system supply resiliency when demand exceeds production capacity. In total, Sonoma veraster's 18 welded steel water tanks provide 129 million gallons of storage, which is approximately three times the if apperage daily system demand. Welded-steel tanks are susceptible to corrosion and have a limited functional lifespa recoatapproximately 50 years without coatings. With regularly scheduled and targeted maintenance, monitoring, and Progrioating activities welded-steel tanks can attain a lifespan of over 100 years. Sonoma Water's Tank Recoating rehabgram specifically targets the protection and maintenance of welded-steel tanks by designing and implementing tank protecabilitation projects that include interior and exterior recoating, structural repairs, and installation of cathodic tection systems to maximize the functional life of each facility.

In FY
omply 22/23 and 23/24 Sonoma Water finalized plans and specifications, solicited bids, and entered an agreement t Cotati nplete recoating Kastania and Cotati No. tank. In FY 24/25 Sonoma water completed recoating at Kastania an nmence recoating at Ralphine No. 1 and Sonoma No. 1 tanks in FY 26/27.

Studie
Idies/Planning
Arc Fl 6,840
Arc Fl; Flash Studies
Electri Flash Studies and Arc Flash Labeling for electrical equipment are required to comply with NFPA 70E (National modelctrical Safety Code) and OSHA requirements. Performing the study includes data collection of the electrical system, includideling, and calculations. The Code requires that Arc Flash Studies be updated on a 5-year cycle. The scope ludes 28 sites in the Water System which will be completed within a 2-vear period.

This u
for 10 siles in le baler system, it ic of largestle aysienm yarn a 202r a cal rail prison ted. is will be provided in the Spring of 2025, and finalized in Summer 2025. he upcoming FY 25/26, studies will be completed for the 18 remaining sites. 2,733
cathodic protection systems, identifying deficiencies, and developing a strategy and program to maintain systems and implement improvements as needed.

Specific objectives of the initial assessment include:

1. Enhancing system reliability and preventing premature failure by minimizing corrosion to infrastructure. costs.

4. Improving operational efficiency by expanding Sonoma Water's cloud-hosted Cathodic Protection monitoring system.

5. Identify program operational and maintenance needs and associated budget and staffing required for continued operation of the system.
24 2/26/2025
51803 Other Contract Services & 51509 SCADA System Contributions Project Information FY25-26
Natural Hazard Reliability Study 25,000
The seismic mitigation planning study will advance feasibility evaluation and refine strategic approaches to implementing measures to mitigate failure risks of the water transmission system to specific seismic vulnerabilities identified as part of prior natural hazard reliability studies. Particular focus of the study will evaluate: 1) liquefaction mitigation solutions to protect collector wells at the Wohler-Mirabel production facilities, 2) strategies that best balance risk mitigation of aqueduct failure at numerous locations of potential seismic vulnerability against a cost-effective and timely implementation approach (including conducting a broad CPT investigation at numerous sites), and 3) analyze alternative seismic retrofit solutions at select water storage tanks.

In FY ?2123 a consultant was contrarted to initiate the lanning study roarinating enterhnical investinations and securiFy 22/23, a consultant was contracted to initiate the planning study, coordinating geotechnical investigations, and along suring necessary permits and permission to enter agreements. In FY23/24, CPT investigations were performed Collecng with seismic assessment of the water storage tanks. Preliminary design of liquefaction mitigation solution of will bellector 5 was also commenced to assess feasibility of implementing a secant pile wall concept. In FY24/25, funding collect be utilized to finalize the preliminary design of Collector 5, assess the feasibility to expand design concepts to other Waterlectors, and prepare a final report. In FY25/26, funding will be utilized to update the draft Seismic Assessment of iter Storage Tanks report with site specific geotechnical data that is planned to be collected.

Retail gional Water Supply Resiliency Study
existintail water providers to over 600,000 people in Sonoma and Marin Counties are regionally connected through each sting water supply infrastructure. Along with purchasing wholesale water from the Sonoma County Water Agency, systenth retail provider also has local supplies which are used to meet the demands of their customers. Although these shortatems are connected, they are not operated or managed in a coordinated manner, especially in times of water Funds
decisinds expended between FY 19/20 and FY24/25 for the Regional Water Supply Resiliency Study were used to build a wildfircision support model to evaluate the region's resiliency to drought, and natural hazards such as seismic events, strategifires and flooding. Based on modeling scenarios completed for the development and evaluation of projects and seismategies to improve the regions water supply reliability during periods of water supply shortage due to drought and improsmic events, development of regional water banking strategies were identified as priority initiatives to pursue to priorityrove the regions water supply resiliency. Funds budgeted for FY 24/25 and FY 25/26 will be used to implement Implebrity recommendations from the Regional Water Supply Resiliency Study to develop a Regional Water Bank facilitielementation Strategy, which would provide a mechanism to integrate the most significant regional water storage grounilities (Lake Sonoma, Santa Rosa Plain groundwater basin, Sonoma Valley groundwater basin, Petaluma Valley transmundwater basin, Lake Stafford, and reservoirs operated and managed by Marin Water), using Sonoma Water's or grohsmission system as the backbone. Surplus surface water during wet periods could be stored in surface reservoirs improgroundwater basins and subsequently extracted during critical drought periods or emergencies thus providing Strate roved resilience and reliability to the region. The scope of work will include (1) develop a Regional Water Bank suppoategy; (2) support participant and partner benefit statements; (3) develop and apply regional water bank model; (4) impler port engagement and outreach; (5) develop funding approach and implementation schedule; and (6) prepare ›lementation strategy report.
25 2/26/2025
51803 Other Contract Services & 51509 SCADA System Contributions Project Information FY25-26
Transmission System Condition Assessments 200,000
During FY24/25, Sonoma Water under the Asset Management Program developed an Aqueduct Condition Assessment report hat reviewed the water system pipeline infrastructure and developed a risk-based prioritization model for inspections. The report evaluated appropriate inspection technologies and developed an inspection projects prioritization plan. The initiation of inspection projects are planned for FY25/26.

Water System Comprehensive Master Plan 400,000
Sonoma Water aims to develop a Comprehensive Water System Master Plan (Master Plan) to define the programs, policies, and projects required to meet the potable water infrastructure needs of Sonoma Water's service area for the next 20-years. Master Plan development will consider future system demands, current system conditions, and requirkt 20-years. Master Plan development will consider future system demands, current system conditions, and commuired system improvements. This Master Plan will yield a prioritized list of projects, serving as a guide for financial broughmitments needed to ensure sufficient operation of the water system's infrastructure. In FY23/24, a consultant was and caught under contract and a kick off meeting was held. During FY 24/25, data was collected about the Water System to proy compiled into TM1 to provide a baseline. Coordination with the Water Contracts is underway and task 2 will work cost forovide a forecast of future water demands on the system. This FY will also begin the work of generating a basis of will best for projects and a methodology for project prioritization. During FY 25/26, the work from the previous four tasks term c be used to identify deficiencies in Sonoma Water's facilities and identify various project groupings to meet long- n capital, operations, and maintenance needs for the Water System. 7,500
Sonortershed Water Quality Monitoring - USGS and LBNL
pollutoma Water's riverbank filtration (RBF) facilities leverage the natural subsurface sediments to remove chemical Sonordy of the natural system processes to demonstrate continued efficacy amidst changing environmental pressures. progrenoma Water has funded studies in collaboration with USGS and LBNL to develop a robust scientific research of RBigram to demonstrate the efficacy of RBF to regulators, to understand the processes that contribute to the efficacy FollowBF, and to identify any potential vulnerabilities (e.g., drought, wildfire, emerging contaminants of concern).

Colleclowing the most recent drought, historically low water levels and reductions in collector efficiency were observed in the rollector 6 during summer and fall, 2021. In response, USGS and LBNL developed a monitoring program to assess efficie role of Russian River streambed clogging (both microbial and physical) on observed reductions in collector measlciency at Wohler and Mirabel. Funds budgeted during FY23/24 and FY24/25 were used to deploy >40 sensors to streanasure streambed infiltration in the river adjacent to Collectors 1, 2, and 6, collect groundwater, surface water, and persis ambed water chemistry samples, and conduct geophysical surveying to better understand the development, used tsistence, and impacts of streambed clogging and its potential impacts on RBF. Funds budgeted for FY25/26 will be reviewed to complete data collection and interpretation, ultimately resulting in publication of the study findings in the peer- resilieliewed scientific literature. Results from this study will help inform operational decision-making and improve system ilience for Sonoma Water's RBF facilities amidst drought and future climate-change impacts. 26 2/26/2025
FY 2025-26 BUDGET

BEGINNING AND ENDING CASH SUMMARY
Section Title: Water Management Planning
Fund/Department No: 44210[33041000
Actual Estimated Adopted Requested Percent
Account Title 2023-2024 2024-2025 2024-2025 2025-26 Difference Change BEGINNING FUND BALANCE 381,063 344,187 222,405

REVENUES

SE OF MONEY / PROPERT
4002 Interest on Pooled Cas 12,32 7.366 7,366 4,550 (2,816) (38.23%) 44050 Unrealized Gains and Losse: 13,77 N/A
....._SUIBTOTAL..._. -. 26102. 7.366 7366 4.550 12816T . (38.23%) -
SUBTOTAL 26,102 7,366 7,366 4,550 (2,816)
INTERGOVERNMENTAL REVENUE 6.12%
42619 Town of Windsor 852 852 11,126 10,274 _5.12%
SUBTOTAL 852 852 11,126 10,274
CHARGES FOR SERVICES lA
45301 Charges for Services 0 TA

SUBTOTAL
HER FINANCING SOURCI 3.33%
101 Transfers In - within a Fu 15,000 15,000 194,000 179,000 47102 Transfers In - btw Govt Func 0 0 0 3.33%
SUBTOTAL 15,000 15,000 194,000 179,000
-3.08%
TOTAL REVENUES 26,102 23,218 23,218 209,676 186,458

EXPENDITURES

SERVICES AND SUPPLIES VA
51205 Advertising Marketing 0 0
51211 Legal Services 142 0 0 0
1212 Legal Services - Extern 0 0
1241 Outside Printing & Bindir 0 VA
0 0 0 VA
0 0 0 VA
0 0.00%
10,511 100,000 100,000 230,000 130,000 6.67%
1917 District Operations Chg 19,063 45,000 45,000 120,000 75,000 1921 Equipment Usage Charge 0 1.38%
SUBTOTAL 29,716 145,000 145,000 350,000 205,000

OTHER CHARGES
53103 Interest on LT Debt
53501 Contributions
TA

OTHER FINANCING USES
57011 Transfers Out - within a Func N/A
57012 Transfers Out - btw Govtl Ful N/A
SUBTOTAL 0 N/A
TOTAL EXPENDITURES 29,716 145,000 145,000 350,000 205,000 141.38% Outsin to Resorts unhances: (19,489)
(13,774)
ENDING FUND BALANCE 344,187 222,405 82,081
27 2/26/2025
FY 2025-26 BUDGET

BEGINNING AND ENDING CASH SUMMARY
Section Title: Watershed Planning/Restoration
Fund/Department No: 44215 [33041100
Actual Estimated Adopted Requested Percent
Account Title 2023-2024 2024-2025 2024-2025 2025-26 Difference Change BEGINNING FUND BALANCE 12,804,811 10,444,099 3,882,765

REVENUES

USE OF MONEY / PROPERTY
44002 Interest on Pooled Cash 422,645 119,377 119.377 71.964 (47,413) (39.72%) 44050 Unrealized Gains and Losses 505,094 0
SUBTOTAL 927,739 119,377 119,377 71,964 (47,413) (39,72%) SUBTOTAL 927,739 119,377 119,377 71,964 (47,413)
INTERGOVERNMENTAL REVENUE 14. 14%
42461 Federal Other Funding 0 0 0
42619 Town of Windsor 91,162 97,387 97,387 111,163 13,775 14.14% SUBTOTAL 91,162 97,387 97,387 111,163 13,775
CHARGES FOR SERVICES lA
45301 Charges for Services 0 0.00%
45332 Watershed Plan/Restore Cho 61.024 40,000 40,000 40,000

0.00%
Subtotal Charges for Service 61,024 40,000 40,000 40,000

ISCELLANEOUS REVENU
S021 Capital Grants - Feder • •
000
'A
00 0000
050 Cancelled/Stale Dated Warr • 0° • 00 'A
200 Revenue Appl PY Misc Rev
TA

SUBTOTAL
OTHER FINANCING SOURCES 13.03%
47101 Transfers In - within a Fund 1,509,605 1,714,950 1,714,950 1,938,370 223,420 1A 47102 Transfers In - btw Govtl Funds 0 13.03%
SUBTOTAL 1,509,605 1,714,950 1,714,950 1,938,370 223,420

9.63%
TOTAL REVENUES 2,589,530 1,971,714 1,971,714 2,161,497 189,782

EXPENDITURES

SERVICES AND SUPPLIES
IA
51021 Communication Expense 00
51061 Maintenance - Equipment 0 lA
51205 Advertising Marketing
51209 Information Tech Svc (non ISC 0 0 lA
51211 Legal Services 0
51212 Legal Services - External 0
51231 Testing/Analysis 82,656
51241 Outside Printing and Binding 186 • 001
51243 Filing Fees 150 3333333335*
51244 Permits/License/Fees 58,394
51401 Rents and Leases - Equipment 1,724
51402 Rents and Leases - Heavy Eqt 17,701
51601 Training/Conference 11
51602 Business Travel/Mileage • •
11232
51605 Private Car Expense
51801 Other Services 0 N/A
51803 Other Contract Services 1,138,718 920,101 538,000 1,993,000 1,455,000 270.45% 51902 Telecommunication Usage 0 0 N/A
51917 District Operations Chgs 2,600,356 58070D 2.423,300 2977,370 22.86% 51921 Equipment Usage Charges 56,670 N/A
28 2/26/2025
Section Title: Watershed Planning/Restoration
Fund/Department No: 44215 [33041100
Actua Estimated Adopted Requested Percent
Account Title 2023-2024 2024-2025 2024-2025 2025-26 Difference Change 52021 Clothing, Uniforms, Personal 4,311 0 0 N/A
52031 Food 528 N/A
52042 Janitorial Supplies
52043 Safety Supplies/Equipment
52061 Fuel/Gas/Oil
52063 Vehicle Parts
52071 Materials and Supplies Expens
52081 Medical/Laboratory Supplies
52091 Memberships/Certifications 0
52101 Other Supplies 0 160,000 160,000
52111 Office Supplies
52114 Freight/Postage
52115 Books/Media....-
52115 Books/Media 646
52117 Mail and Postage Supplies 88
52141 Minor Equipment/Small Tools
52142 Computer Equipment/Accesso
52143 Computer Software
52144 Equipment Allowance 0
52181 Business Meals/Supplies 0
52191 Utilities Expense 0
52192 Utilities - Gas/Propane 0 0
SUBTOTAL 4,045,890 6,779,810 2,961,300 5,130,370 2,169,070

OTHER CHARGES
53104 Other Interest Expense 0
53402 Depreciation Expense 7,665 8,000 3,000 8,000
53403 Loss - Disposed Capital Asset 56,266 0
53501 Contributions 144,577 0 0
SUBTOTAL 208,507 8,000 8,000 8,000 00

REIMBURSEMENTS 'A
58010 Reimb. - Genera 0 0
TA
SUBTOTAL 0

FIXED ASSETS 'A
19840 Acq-WIP-Equipment 16,861 0 0 0 10.00%)
19841 Acq-WIP-Intangibles 145,661 1,753,239 488,000 (488,000) 'A 19851 Intangible Assets - Non-amort 0 0

10.00%)
SUBTOTAL 162,522 1,753,239 488,000 (488,000)

OTHER FINANCING USES 'A
57011 Transfers Out - within a Fund 'A
57012 Transfers Out - btw Govt Func

SUBTOTAL
_18.62%
TOTAL EXPENDITURES 8,541,049 3,457,300 5,138,370 1,681,070 utstanding Encumbrances - Net Chan!
apital Intere
Depreciation 8,000 8,000
Change in prepaid expens 0
Jain/loss on disposal of Capital Asset
(54,235)
0 ENDING FUND BALANCE 10,444,099 3,882,765 913,891
29 2/26/2025
FY 2025-26 BUDGET

BEGINNING AND ENDING CASH SUMMARY
Section Title: [Recycled Water and Local Supply
Fund/Department No: [44220 ] 33041200
Actual Estimated Adopted Requested Percent
Account Title 2023-2024 2024-2025 2024-2025 2025-26 Difference Change BEGINNING FUND BALANCE 753,070 (13,256) (5,097)

REVENUES

USE OF MONEY / PROPERTY
'SE OF MONEY / PROPERTY ) (100.00%)
44002 Interest on Pooled Cash 24,385 8,158 8,158 (8,_ N/A 44050 Unrealized Gains and Losses 26,727 0 5 (100.00%)
SUBTOTAL 51,112 8,158 8,158 (8,
INTE
{TERGOVERNMENTAL REVENUE N/A
42358 State Other Funding N/A
• 0 NIA
42619 Town of Windsor
SUBTOTAL 0 344
CHA!

CHARGES FOR SERVICES N/A
45301 Charges for Services N/A
4 45333 Recycled Water & Local Supply E o 00° N/A
45401 Revenue Appl PY Chgs for Svc 0°
SUBTOTAL 33
MISC
4ISCELLANEOUS REVENUE N/A
46022 Capital Grants-State N/A
: 46029 Donations/Contributions N/A
46200 Revenue Appl PY Misc Revenue • 000 • 000 N/A
46029 Donations/Contributions N/A
SUBTOTAL 0
OTHI

THER FINANCING SOURCES N/A
47101 Transfers In - within a Fund 0 0 6,000 6,L N/A
47102 Transfers In - btw Govti Funds 0 N/A
SUBTOTAL 6,000 6,-
(22.24%)
EXI TOTAL REVENUES 51,144 8,158 8,158 6,344 (1,

EXPENDITURES
SER!

SERVICES AND SUPPLIES
51021 Communication Fynense
51205 Advertising/Marketing Svc
51209 Information Tech Svc (non ISD) 000
51211 Legal Services ...
51212 Legal Services - External • • • • • • • 0
51226 Consulting Services
51241 Outside Printing and Binding
51244 Permits/License/Fees
51401 Rents and Leases - Equipment
51601 Training Services
51602 Business Travel/Mileage
51803 Other Contract Services
51902 Telecommunication Usage • • • • •00
51915 ISD - Reprographics Services
51917 District Operations Chgs • • 0
51921 Equipment Usage Charges
30 2/26/2025
Section Title: Recycled Water and Local Supply
Fund/Department No: 44220 33041200
Actual Estimated Adopted Requested Percent
Account Title 2023-2024 2024-2025 2024-2025 2025-26 Difference Change 52031 Food 0 N/A
52061 Fuel/Gas 0 0 N/A
52101 Other Supplies 0 0 N/A
52115 Books/Media/Subscriptions N/A
0 N/A
0 N/A
0 N/A
• 0 N/A
0 N/A
52191 Utilities Expense N/A
SUBTOTAL 241,231
OTHI

ETHER CHARGES N/A
53103 Interest on LT Debt N/A
: 53104 Other Interest Expense 0 0.00%
53402 Depreciation Expense 5,966 6,000 6,000 6,000 ) (100.00%) 53501 Contributions 23,662 0 25,000 1251)
(80.65%)
SUBTOTAL 29,627 6,000 31,000 6,000 (25,1
FIXE
N/A
IXED ASSETS. N/A
19831 CIP - Bldg & Impr 0
1 19832 CIP - Infrastructure 00° N/A
19841 Work in Progress - Intang
NIA
SUBTOTAL 0

OTHER FIANCING USES N/A
57011 Transfers Out - within a Fung N/A
7012 Transfers Out - btw Govt Fun 00 :

N/A

SUBTOTAL
(80.65%)
TOTAL EXPENDITURES 270,858 6,000 31,000 6,000 (25,1
Adju:

Outsdjustments to Reserves/Encumbrances:
(209,241)
(208,769)
0 0
5,966 6,000
Inreudit Adjustment (AIF (107,840) 0
Phrealized Gain/ Loss (GASB 31 (26,727)
END. ROUnding DALAIVUE 110,600, (1) 1,441
31 2/26/2025
FY 2025-26 BUDGET

BEGINNING AND ENDING CASH SUMMARY
Section Title: Water Conservation
Fund/Department No: 44225 33041300
Actual Estimated Adopted Requested Percent
Account Title 2023-2024 2024-2025 2024-2025 2025-26 Difference Change BEGINNING FUND BALANCE 398,903 48,878 65,671

REVENUES

E OF MONEY / PROPER
002 Interest on Pooled Ca 17,139 2,563 2,563 1,806 (757) (29.54%) 44050 Unrealized Gains and Losses 19.743 N/A
44201 Royalties NIA
44201 Royalties 0
9,54%)
SUBTOTAL 36,885 2,563 2,563 1,806 (757)

INTERGOVERNMENTAL REVENUE N/A
42358 State Other Funding 71,817 388,330 0 38,000 38,000 6.62%) 42461 Federal Other Funding 26,718 1,942,860 1,036,360 35,000 (1,001,360) NIA 42601 County of Sonoma 31,727 54,725 N/A
42610 Other Governmental Agencies 0 N/A
42611 City of Santa Rosa 0 N/A
42612 City of Petaluma 0 NIA
42613 City of Rohnert Park 0 N/A
42615 City of Cotati N/A
42618 City of Sonoma 0 0 7.20%
42619 Town of Windsor 137,098 144,816 144,816 155,237 10,421 N/A 42621 North Marin Water District 0 0 0

0.68%)
SUBTOTAL 267,361 2,530,731 1,181,176 228,237 (952,939)
CHARGES FOR SERVICES 0.00%
45301 Charges for Services 42,000 42,000 N/A

14.708 42,000 0
45316 Water Conservation 0 0 0.00%
SUBTOTAL 46,262 42,000 42,000 42,000

MISCELLANEOUS REVENUE N/A
16021 Capital Gaing - Federal N/A
46022 Capital Grants - State • • 4.83%
0 0 0
58,000 58,000 316,000 258,000 N/A
A800 Milanes Revenue N/A
0 0
46041 Discounts Earned 0 N/A
16050 Cancelled/Stale Dated Warrant: 0 0 N/A
6200 Revenue Appl PY Misc Revenu 0 N/A
6204 PY Intergovmntl Rev - Othe 14,498 0 0 N/A
6215 Other Grant 0

4.83%
SUBTOTAL 14,498 58,000 58,000 316,000 258,000
OTHER FINANCING SOURCES 6.15%
47101 Transfers In - within a Fund 2,270,23 2,550,140 2,550,140 2,706,900 156,760 N/A SUBTOTAL ,270.23 2,550,140 2,550,140 2,706,900 156,760 6.15% TOTAL REVENUES 2,635,239 5,183,434 3,833,879 3,294,943 (538,936) (14.06%)

EXPENDITURES

ERVICES AND SUPPLIE
021 Communication Expen 0 0 N/A
0 • • • • N/A
9,105 N/A
0 • 000 • 0• N/A
39,143 0 N/A
775 0 N/A
32 2/26/2025
Section Title: Water Conservation
Fund/Department No: 44225 33041300
Actual Estimated Adopted Requested Percent
Account Title 2023-2024 2024-2025 2024-2025 2025-26 Difference Change 51211 Legal Services 639 0
1214 Agency Extra/Temp Help 0 0
1225 Training Services
51230 Security Services 0 0
51241 Outside Printing and Binding 41,000
51244 Permits/License
51249 Other Professional Services
51250 Planning/Mapping/Inspections
51301 Publications and Legal Notices
51401 Rents and Leases - Equipment 0
51601 Training Services 0 0
51602 Business Travel/Mileage 1 bood 13,000
51602 Business Travel/Mileage 13,000
51605 Private Car Expense 525 0 0
51801 Other Services 0 0
51803 Other Contract Services 498,400
51902 Telecommunication Usage
51915 ISD Reprographics Services 0
51917 District Operations Chgs 2,500,000
51921 Equipment Usage Charges
52021 Clothing, Uniforms
52031 Food 753
52042 Janitorial Supplies
52043 Safety Supplies/Equipment
52061 Fuel/Gas/Oil 0 0
52071 Materials and Supplies Expense 31,508 93,500 93,500 81,000 (12,500) 52091 Memberships/Certifications 5,974 12,000 12,000 6,000 (6,000) 52101 Other Supplies 0
52111 Office Supplies 1,107
52112 Office Furniture/Fixtures
52114 Freight/Postage 0
52115 Books/Media/Subscriptions A
3,827
52117 Mail and Postage Supplies 216
52141 Minor Equipment/Small Tools 1,602
52142 Computer Equipment/Accessories
52162 Special Department Expense
52171 Water Conservation Program 30,000 243,000 273,000 166,500 (106,500) 52181 Business Meals/Supplies 0 0
SUBTOTAL 2,897,937 3,266,651 2,868,500 3,305,900 437,400

OTHER CHARGES
53500 Contributions Non-County Agy 0 0 0
53501 Contributions 62,497 2,299,990 1,026,000 (1,026,000) 53502 Community Grants 0
SUBTOTAL 62,497 2,299,990 1,026,000 (1,026,000)

OTHER FINANCING USES N/A
57011 Transfers Out - within a Fund N/A
57012 Transfers Out - btw Govtl Fund NIA
LUIME EAPETOTAURED 0
2,900,400 0,000,041 0,054, ovU 0, 000, JUU 1000, 000) (15.11%) Adjustments to Reserves/Encumbrances:

Outstanding Encumbrances - Net Char (77,903) 0
Change in Windsor Reserve (121,784) 400,000 0
Change in Prepaid Expense 6,500
Jnrealized Gain/ Loss (GASB 31 (19,743)
Post Audit Adjustment 188,098
Rounding 2
ENDING FUND BALANCE 48,878 65,671 54,714
33 2/26/2025
Water Transmission Budget
2025-26
Itemized Detail for Subfunds Consulting/Contractual Services Budget zed Detail for Subfunds Consulting/Contractual Services FY25-26 Water 1
Annual br Management Planning
and subal Water Supply and Demand Assessment: Develop scope, cost, and schedule to complete a water supply and demand analysis and preparation Annual submittal of the required Annual Water Shortage Assessment Report to the Department of Water Resources by July 1 each year. Results of the al Assessment are also required to inform the work of Sonoma Water's contractors' Assessment Reports to DWR. 30,000
Sonomama 24 ter complare AND was lied as descri pr and thal a 4 te tre gade contain rs 24-25 he a in again bie conte d with DWiscribed and results shared with the water contractors to inform the completion of their reports. Sonoma Water's completed AWSDA will be filed WR prior to the July 1, 2025 reporting deadline. The same tasks will be completed in FY 25-26.

Waters
ershed Planning/Restoration
Habitat IR Decision 1610 Change Petition: Russian River Flows and Fish Flow Proiect EIR: Continued preparation of Environmental Impact Report for Fist The EIRat Flows and Water Rights Project (Fish Flow Project EIR) in preparation for any additional impact analysis, flow modeling, and monitoring needed. submiss:IR is being prepared by Sonoma Water staff, with assistance from consultants on some areas of analysis. In FY23/24, most of the work focused of identifierission of annual Temporary Urgency Change (TUC) Petitions to the State Board to approve the requested changes to minimum in-stream flows as accomplfied in the Biological Opinion and fisheries and water quality monitoring and reporting required by any State Board TUC Order. Work being issued implished in FY24/25 includes updates to modeling and project analysis, and lab analysis for water quality monitoring under the multiple TUC Order:
oring related to the annual TUC.

NMFS),R Estuary Management: Required Annual Biological Opinion Activities: Sonoma Water, in consultation with the National Marine Fisheries Service adaptiveS), California Department of Fish & Wildlife (CDFW) and the U.S. Army Corps of Engineers (Corps), is required to annually prepare a lagoon outle camera tive management plan by April 1; conduct and record monthly surveys of the beach topography and the outlet channel; use a time lapse video 435,000 quality mra to record the interaction of waves, tides and the river mouth; conduct baseline monitoring of seals and other pinnipeds, conduct estuary water include iy monitoring, conduct juvenile steelhead and coho salmon rearing surveys, and prepare annual reports. Other FY23/24 and FY24/25 activities includesle installation and monitoring of downstream migrant salmonid traps and water quality monitoring stations. Work being completed in FY24/25 anticipates preparation of the annual adaptive management plan, renewing regulatory permits, and continuation of monitoring and studies. Work Upper Rpated for FY25/26 includes renewing regulatory permits and monitoring studies. 25,000
Monitorilocino management, Fish Habitat Flows and Water Rights Project, the Forecast Informed Reservoir Operations (FIRO) projects, and TUC orders. the effororing included the deployment of datasondes and collection of grab samples, as well as laboratory analysis. Work anticipated for FY25/26 includes 2/26/2025
Water Transmission Budget
2025-26
Itemized Detail for Subfunds Consulting/Contractual Services Budget zed Detail for Subfunds Consulting/Contractual Services FY25-26 and Callscape Resiliency: Multiyear fire landscape resiliency effort at Lake Sonoma to protect source water quality in partnership with the U.S. Army Corps; 200,000 facilitate alFire. In FY24/25, met with CalFire and USACE to identify areas that require vegetation treatment, conducted vegetation management, and ated CalFire controlled burns. The same tasks will be undertaken in FY 25-26. 5843,000
Recyck
Recyclercled Water and Local Supply
Sonomadled Water and Local Supply costs have historically been for Sonoma Water's share of the groundwater sustainability agency's contributions. ma Water's share of mandatory fees has been included in the Agency Operating fund in FY 2025/2026.

Water (
51241-Cr Conservation
WUE/1-Outside Printing and Binding 41,000
51602e Water Ed Program materials, Eco-Friendly Garden Tour materials, Water Smart Plant Label materials.

Attend I2-Business Travel/Mileage 13,000
51803-C local and statewide meetings representing the Partnership and Sonoma Water Garden 3-Other Contract Services 20,000
Green Ben Sense Contract: Funding provides onsite visits by local master gardeners to support local turf removal programs.

Certifican Business Program: Funding to staff a part time position which provides water assessments for local businesses pursuing the Green Business 30,000 Educatic cation. 10,000
Plant Laational Content: Displays for Education Center. 20,000 OWEL: Labeling Program: Funding for nursery liaison to ensure locally appropriate plants are labeled, nursery staff trainings, outreach tabling. 64,000 Sonoma: QWEL website and database maintenance contract, QWEL trainings. 10,000 SMSWEma County Fair: Sponsorship of general WUE display/materials at the Sonoma County Fair. 8,400 Spatial NP website: Website hosting, maintenance, and development. 250,000 Water Eal Analysis: CIl Landscape Measurements for contractors. 50,000 Water Lf Ed Bus Contract: Shuttle from school to field study sites for Water Education Program. 36,000 r Loss Programs: Technical assistance for regional water loss meetings and audit validations. 498,400 2/26/2025
35 Water Transmission Budget
2025-26
Itemized Detail for Subfunds Consulting/Contractual Services Budget zed Detail for Subfunds Consulting/Contractual Services FY25-26 51917-0_
Salarie 7-District Operations Chas $ 2,500,000
ies, benefits and overhead costs for staff assigned to projects budgeted within the Water Conservation Fund (Includes USBR WaterSMART Grant 52071-N
Water E1-Materials and Supplies Expense
81,000
workboor Ed Teaching Materials: pH strips, fabric for displays, youth outreach displays, pencil sharpeners, pencils, classroom testing kits, maps, sooks, rulers, toothbrushes, stickers, etc. Garden Tour, fair demo garden sian. 52091-N
Irrigatior1-Memberships/Certifications 6,000
Efficienaion Association and AWWA Certificate Renewals, Water Education Foundation, and California Water Efficiency Partnership, Alliance for Water ency, etc.
52171-V
Outdoor1-Water Conservation Program 1,500
or Water Use Focused Programs: Russian River Friendly Workshops, Living Learning Landscapes Demo Gardens, etc.

Public Ir 60,000
c Information/Outreach Programs: Media campaign for the Sonoma-Marin Saving Water Partnership including media ad buy, ad development.

Saving l 20,000
Urban Ag Water Partnership Wholesaler Support: Acting as the regional liaison attend meetings of the CalWEP, Alliance for Water Efficiency, ACWA, School E Advisory Group, CA Science Teachers Association, environmental education conference. 70,000
teacher ol Education Program: Such as assembly program, port-a-potties, steelhead in the classroom program, youth outreach events, teacher program, Seminar er trainings, educational workbooks, maps.
15,000
Participinars, Workshops, Training: Host trainings/ workshops to benefit the Partnership, such as Statewide Framework, Water Loss, speakers bureau. sipation in national/statewide studies such as those conducted by CalWEP and AWE. 5 166,500 5 3,305,900
Tota
2/26/2025
36 FY 2025-26 BUDGET

BEGINNING AND ENDING CASH SUMMARY
Sentinepartment No: Santa Rosa Aqueduct Capital Fund
4423033045000
Actual Estimated Adopted Requested Percent
Account Title 2023-2024 2024-2025 2024-2025 2025-26 Difference Change BEGINNING FUND BALANCE 9,662,681 10,305,302 10,097,733

REVENUES

USE OF MONEY / PROPERTY
SE OF MONEY / PROPERTY (1.24%)
309,932 314,171 314,171 310,281 (3,85 NIA
0 N/A
326,898 (1.24%)
SUBTOTAL 636,830 314,171 314,171 310,281 (3,85
MISS

ISCELLANEOUS REVENUES N/A
6040 Miscellaneous Revent 0 0 N/A
6021 Capital Grants - Feder N/A
6029 Donations/Contribution 0 N/A
6050 Cancelled/Stale Dated 0. N/A

SUBTOTAL
ADM

DMINISTRATIVE CONTROL ACCOUNT N/A
49002 Advances 0 N/A
49003 Advances Clearing 0 N/A

SUBTOTAL
OTH

3.51%
321,676 299,408 299,408 309,921 10,51 N/A
0 0 0 3.51%
SUBTOTAL 321,676 299,408 299,408 309,921 10,51
SPE

PECIAL ITEMS N/A
48004 Residual Equity Transfe 0 0 N/A

SUBTOTAL

1.08%
TOTAL REVENUES 958,506 613,579 613,579 620,202 6,62
EXI
OTH:XPENDITURES

THER CHARGES N/A
53103 Interest on LT Debt 0 0 0 N/A
53105 Costs of Issuance 0 0 0 N/A

SUBTOTAL N/A

FIXED ASSETS
19820 Machinery and Equipme 0 0 0 N/A
19822 Mobile Equipment 0 0 N/A
19824 Computer Equipment 0 0 0 N/A
19831 CIP - Bidg & Impr 0 0 N/A
19832 CIP - Infrastructure 0 821,148 130,247 130,247 N/A 19840 Work in Progress - Eqt 0 0 N/A
19841 Work in Progress - Inta 0 0 N/A
19851 Intangible Assets - Nor 0 0 0 N/A
SUBTOTAL 821,148 130,247 130,247 N/A
37 2/26/2025
Section Title: [Santa Rosa Aqueduct Capital Fund
Fund/Department No: 44230|| 33045000
Actual Estimated Adopted Requested Percent
Account Title 2023-2024 2024-2025 2024-2025 2025-26 Difference Change

OTHER FINANCING USES
57011 Transfers Out - within a N/A

SUBTOTAL N/A
TOTAL EXPENDITURES 821,148 0 130,247 130,247 N/A
Adjustments to Reserves/Encumbrances:

Idjustments to Reserves/Encumbrances:
: Unreaize Cain Loss (GASE 31) 0
11,013
| Capitalized Interest (326,898)
Post Audit Adjustment
Rounding
ENC
NDING FUND BALANCE 10,305,302 10,097,733 10,587,688
38 2/26/2025
FY 2025-26 BUDGET

BEGINNING AND ENDING CASH SUMMARY
Section Title: Petaluma Aqueduct Capital Fund
Fund/Department No: 44235 33045100
Actual Estimated Adopted Requested Percent
Account Title 2023-2024 2024-2025 2024-2025 2025-26 Difference Change BEGINNING FUND BALANCE 7,672,321 3,817,392 4,615,690

REVENUES

USE OF MONEY / PROPERTY
45F MONEY PROPERIT 1n1 zen no con 170 anni (72.67%)
234,550 104,762 28,633 (76,130 N/A
101.760 0 N/A
260,888 0 (72.67%)
SUBTOTAL 495,438 104,762 104,762 28,633 (76,130

MISCELI
4 ELLANEOUS REVENUE NIA
46021 Capital Gains - Federa 242,448 2,134,138 0
N/A
SUBTOTAL 242,448 2,134,138

ADMINIS
4WISTRATIVE CONTROL ACCOUNT N/A
4! 49002 Advances 0 N/A
49003 Advances Clearing 0
N/A

SUBTOTAL
OTHER!
N/A
80,657 1,571,766 1,571,766 N/A
0 N/A
SUBTOTAL 80,657 0 1,571,766 1,571,766.
1427.65%
TOTAL REVENUES 818,544 2,238,900 104,762 1,600,399 1,495,636 EXPEI
'ENDITURES
OTHER!

5.R CHARGES N/A
5: 53103 Interest on LT Debt 0 N/A
5: 53104 Other Interest Expense N/A
5: 53105 Costs of Issuance • • N/A
53403 Loss - Disposed Capital Asset 0.

N/A

SIRTOTAI

FIXED ASSETS
19820 Machinery and Equipment N/A
0 0 N/A
19824 Computer Equipment N/A
0 0 0 0 N/A
797,227 1,440,602 2,841,016 3,119,107 278,091 9.79%
0 0 N/A
16,805 0 0 0 N/A
0 0 N/A
SUBTOTAL 814,033 1,440,602 2,841,016 3,119,107 278,091 9.79% 39 2/26/2025
Section Title: Petaluma Aqueduct Capital Fund
Fund/Department No: 44235 | 33045100
Actual Estimated Adopted Requested Percent
Account Title 2023-2024 2024-2025 2024-2025 2025-26 Difference Change

SPECIAL ITEMS
56030 Residual Equity Transfers 0 0 0 N/A
SUBTOTAL 0 0 N/A

OTHER FINANCING USES
57011 Transfers Out - within a Fund

SUBTOTAL

9.79%
TOTAL EXPENDITURES 814,033 1,440,602 2,841,016 3,119,107 278,091 Adjusti
Advatments to Reserves/Encumbrances:

Incredvance to Common 0
Capicrease/(Decrease) in Loan Payable 0 0
Lossapitalized Interest 0 0
Princss on Fixed Asset 0 0 0
Char incipal Received on Loan 0 0
Donaange in Encumbrances (3,598,553) 0
Unreonated Asset
_nrealized Gain/ Loss (GASB 31) (260,888) 0
ENDING Rounding 0
NG FUND BALANCE 3,817,392 4,615,690 3,096,981
40 2/26/2025
FY 2025-26 BUDGET

BEGINNING AND ENDING CASH SUMMARY
Section Title: Sonoma Aqueduct Capital Fund
Fund/Department No: 4424033045200]
Actual Estimated dopte Requested Percent
Account Title 2023-2024 2024-2025 2024-202 2025-26 Difference Change BEGINNING FUND BALANCE 43,111 208,414 151,556

REVENUES

USE OF MONEY / PROPERTY
44002 Interest on Pooled Cash 75,540 1,615 1,615 7,862 6,247 386.72% 44002 Interest on Pooled Cash 75,540 1,615 1,615 7,862 6,24: N/A 44003 Other Interest Earnings N/A
44050 Unrealized Gains & Losses 681 386.72%
SUBTOTAL 76,221 1,615 1,615 7,862 6,24
MISC

ISCELLANEOUS REVENUES N/A
46200 Transfers In - within a Fund (46)
N/A
SUBTOTAL (46) 0
OTH
THER FINANCING SOURCES 0.68%
47101 Transfers In - within a Fund 275,741 211,752 211,752 213,191 1,43l N/A 47102 Transfers In - btw Govtl Func 0

0.68%
SUBTOTAL 275,741 211,752 211,752 213,191 1,43
SPE

PECIAL ITEMS N/A
48004 Residual Equity Transfers 0
N/A

SUBTOTAL

3.60%
EXI TOTAL REVENUES 351,916 213,368 213,368 221,053 7,68! :XPENDITURES
OTH

THER CHARGES N/A
53103 Interest on LT Debt 0 N/A
53104 Other Interest Expense 0 0 N/A
53105 Costs of Issuance N/A
53403 Loss-Disposed Capital Asset 0
N/A

CIRTOTAI

FIXED ASSETS
19820 Machinery and Equipment 0 N/A
19822 Mobile Equipment 0 N/A
19824 Computer Equipment N/A
19831 CIP - Bldg & Impr 0 0 N/A
19832 CIP - Infrastructure 212,041 270,225 173,200 (173,200) (100.00%) 9840 Work in Progress - E 0 N/A
9841 Work in Progress - Intar 0 N/A
19851 Intangible Assets - Non-amor 00 N/A
SUBTOTAL 212,041 270,225 173,200 0(173,200) (100.00%)
41 2/26/2025
Section Title: Sonoma Aqueduct Capital Fund
Fund/Department No: 4424033045200
Actual Estimated Adopted Requested Percent
Account Title 2023-2024 2024-2025 2024-2025 2025-26 Difference Change

OTHER FINANCING USES
57011 Transfers Out - within a Func 0 N/A
SUBTOTAL 0 N/A
TOTAL EXPENDITURES 212,041 270,225 173,200 • (173,200) (100.00% Adjustments to Reserves/Encumbrances:

Outstanding Encumbrances - Net Change 26,062
Sale or Purchase of Fixed Asset ............

GaSale or Purchase of Fixed Assel 0
UnGain/loss on disposal of Capital Assets 46 0 l 0
'Unrealized Gain/ Loss (GASB 31 (681) 0
oPost Audit Adjustmer
Rounding (1)
END
NDING FUND BALANCE 208,414 151,556 372,609
DRAF
42 2/26/2025
FY 2025-26 BUDGET

BEGINNING AND ENDING CASH SUMMARY
Section Title: Storage Facilities
Fund/Department No: 4425033043000
Actual Estimated Adopted Requested Percent
Account Title 2023-2024 2024-2025 2024-2025 2025-26 Difference Change BEGINNING FUND BALANCE 2,225,427 2,390,075 663,241

REVENUES

USE OF MONEY / PROPERTY
40QF MONEY / PROPERT 4506.51%
4054002 Interest on Pooled Cas 76,546 262 262 12,054 11,792 N/A 4050 Unrealized Gains & Losses 46,828 0-
4506.51%
SUBTOTAL 123,374 262 262 12,054 11,792

MISCELI
460 ELLANEOUS REVENUE N/A
4606021 Capital Grants - Federal 0 0 0 N/A
4606022 Capital Grants - State N/A
4605029 Donations/Contributions 0 N/A
4605040 Miscellaneous Revenue 0 N/A
4626041 Discounts Earned 000 0 N/A
5200 PY Revenue - Miscellaneous 0
N/A

SUBTOTAL
SPECIAl
480(IAL ITEMS N/A
480B004 Residual Equity Transfers 19,339 00 N/A
3005 Contributed Capital 0 NIA
SUBTOTAL 19,331

ADMINIS
490NISTRATIVE CONTROL N/A
4900002 Advances N/A
9003 Advances Clearing • 0
NIA
OTHER! SUBTOTAL
471(R FINANCING SOURCES 21.99%
4717101 Transfers In - within a Fund 77,000 1,287,000 1,287,000 1,570,000 283,000 N/A 7102 Transfers In - btw Govtl Funds

21.99%
SUBTOTAL 77,000 1,287,000 1,287,000 1,570,000 283,000

22.90%

EXPENDITURES

OTHER CHARGES
3103 Interest on LT Dek 0 0 N/A
3104 Other Interest Expens 0 N/A
53403 Loss - Disposed Capital Asset 0 0 0 N/A

SUBTOTAL N/A
43 2/26/2025
Section Title: Storage Facilities
Fund/Department No: 4425033043000]
Actual Estimated Adopted Requested Percent
Account Title 2023-2024 2024-2025 2024-2025 2025-26 Difference Change 19831 CIP - Bldg & Impr 859,881 N/A
19832 CIP - Infrastructure 153,900 3,014,096 1,245,086 2,104,967 69.06% 19841 Acq-WIP-Intangibles 73,735 N/A
19851 Intangible Assets - Non-amort N/A
SUBTOTAL 227,635 3,014,096 1,245,086 2,104,967 859,881 69.06% 590NISTRATIVE CONTROL ACCOUNT N/A
5900002 Advances 0 N/A
9003 Advances Clearing NIA
SUBTOTAL 0
OTHER!
570'R FINANCING USES N/A
7011 Transfers Out - within a Fund 0 N/A

SUBTOTAL

69.06%
TOTAL EXPENDITURES 227,635 3,014,096 1,245,086 2,104,967 859,881 Adjustm
0 0
0 Y CIP anding Encumbrances - Net Change
B & I TsfP adjustment - reclass to PY Ext
LTD ProTsfrs • 0°
Sold Ass'roceeds
Capitalizasset
Move Pralized Interest
Gain/lossProject CIP Balance (19,331)
Unrealizoss on disposal of Capital Assets
Change ilized Gain/ Loss (GASB 31) (46,828)
Roure in Encumbrances 238,736 0
ENDIN@unding 1
NG FUND BALANCE 2,390,075 663,241 140,327
44 2/26/2025
FY 2025-26 BUDGET

BEGINNING AND ENDING CASH SUMMARY
Section Title: Common Facilities
Fund/Department No: 44260 33043200
Actual Estimated Adopted Requested Percent
Account Title 2023-2024 2024-2025 2024-2025 2025-26 Difference Change BEGINNING FUND BALANCE 11,595,612 11,311,998 3,204,708

REVENUES
44)F MONEY / PROPERTY (46.81%)
4144002 Interest on Pooled Cas 103,245 103,245 54,913 (48,33 N/A 4144003 Other Interest Earning 32361g N/A
0 44050 Unrealized Gains & Losses 288,451 (46.81%)
612,067 103,245 103,245 54,913 (48,33
CHARGE
45 GES FOR SERVICES NA
45062 Construct/Bldg Permit Rvw Svc
NIA

SUBTOTAL

MISCELI
46ELLANEOUS REVENUES N/A
46146021 Capital Grants - Federal 0 N/A
46146022 Capital Grants - State 2,327,469 3,174,592 N/A 46146027 Insurance Claims Reimburseme 0 N/A
46146029 Donations/Contributions N/A
46146040 Miscellaneous Revenue N/A
46:46041 Discounts Earned 0 N/A
46:46200 Revenue Appl PY Misc Revenu 0 0 N/A
• •
46215 Other Grants 860,854 N/A
SUBTOTAL 2,327,469 4,035,446

ADMINIS
49NISTRATIVE CONTROL N/A
49149002 Advances N/A
49003 Advances Clearing N/A

SUBTOTAL

OTHER F
47R FINANCING SOURCES 98.90%
47 47101 Transfers In - within a Fund 3,619,858 5,078,000 5,078,000 10,100,000 5,022,00 N/A 47102 Transfers In - btw Govt Funds 0 98.90%
SUBTOTAL 3,619,858 5,078,000 5,078,000 10,100,000 5,022,00.

95.99%
-----

EXPENDITURES

OTHER CHARGES
53103 Interest on LT Debt 0 N/A
53104 Other Interest Expense 0 0 000 N/A
53403 Loss - Disposed Capital Asset 39,422 0 0 0 N/A
SUBTOTAL 39,422 N/A

FIXED ASSETS
19810 Land 00 N/A
19811 Acq-Land Improvements 75,323 0 0 N/A
19812 Acq-CIP-Land 653,683 1,124,820 N/A
19831 CIP - Bldg & Impr 0 0 N/A
45 2/26/2025
Section Title: Common Facilities
Fund/Department No: 44260 ][33043200
Actual Estimated Adopted Requested Percent
Account Title 2023-2024 2024-2025 2024-2025 2025-26 Difference Change 19832 CIP - Infrastructure 4,016,308 16,179,160 11,403,800 12,926,099 1,522,299 13.35% 19840 Acq-WIP-Equipment 0 N/A
19861 intangibe Asses - Nomamort 20,000 00 N/A
N/A
SUBTOTAL 4,745,315 17,323,980 11,403,800 12,926,099 1,522,299 13.35%

OTHER FINANCING USES
57011 .Transfers Out = within a Fund N/A
57011 Transfers Out - within a Fund N/A

SUBTOTAL

ADMINIS
59VISTRATIVE CONTROL ACCOUNT N/A
59159002 Advances N/A
59003 Advances Clearing 0° 00 N/A

SUBTOTAL

13.35%
TOTAL EXPENDITURES 4,784,737 17,323,980 11,403,800 12,926,099 1,522,29 Adjustme
Loan frtments to Reserves/Encumbrances:

Technic from Petaluma Aqueduct Capital Fun:

Principhnical Adjustments - BRO's
Advancipal payment on Loan from Petaluma /
Outstarances 0 0
Capitalistanding Encumbrances - Net Change (1,955,735)
Gain/loitalized Interest
Procee/loss on disposal of Capital Assets 39,632
PY CIP eeds from State Loan & Other LT Debt 0
B & I TIP adjustment - reclass to PY Exp (los
Auditor! Tsfr to ISF (Facilities) Fund
Sale oritor Adj - Reversal of Duplicate Pymt
Change or Purchase of Fixed Asset
Move Fnge in Deposit w/Others
Change Project CIP Balance (33,987)
Post Aunge in Contingent Liability 0
Unreali: Audit Adjustment 180,269
Roundişalized Gain/ Loss (GASB 31) (28,451)
_nding 0
ENDING.

NG FUND BALANCE 11,311,998 3,204,708 433,523
46 2/26/2025
FY 2025-26 BUDGET

BEGINNING AND ENDING CASH SUMMARY
Section Title: North Marin Water Deposit
Fund/Department No: 4430033045300
Actual Estimated Adopted Requested Percent
Account Title 2023-2024 2024-2025 2024-2025 2025-26 Difference Change BEGINNING FUND BALANCE 28,669 29,711 30,682

REVENUES

USE OVENUES
OF MONEY / PROPERTY (3.72%)
44002 Interest on Pooled Cash 1,042 971 971 934 (36) N/A 44050 Unrealized Gains and Losse: 1,121 (3.72%)
SUBTOTAL 2,163 971 971 934 (36)
INTERC

RGOVERNMENTAL REVENUE N/A
42610 Other Governmental Agencie 52,545
N/A
SUBTOTAL 52,545 0
OTHER

ER FINANCING SOURCES N/A
47101 Transfers In - within a Fund N/A

SUBTOTAL
(3.72%)
TOTAL REVENUES 54,708 971 971 934 (36)
EXPE

OTHER ENDITURES

ER CHARGES N/A
53501 Contributions N/A

SUBTOTAL
OTHER

ER FINANCING USES N/A
57011 Transfers Out - within a Func N/A
SUBTOTAL 0
N/A

TOTAL EXPENDITURES
Adjustn
Unreastments to Reserves/Encumbrances:

Post 4a again 0 (AS 31) 1,121
Rounding
ENDING FUND BALANCE 29,711 30,682 31,616
47 2/26/2025
FY 2025-26 BUDGET

BEGINNING AND ENDING CASH SUMMARY
Section Title: [State Loan Debt Service Fund
Fund/Department No: 4426533047000
Actual Estimated Adopted Requested Percent
Account Title 2023-2024 2024-2025 2024-2025 2025-26 Difference Change BEGINNING FUND BALANCE 5480,004 $550,566 $159,026
REJEGINNING FUND BALANCE $480,004 $550,566 $159,026

USE EVENUES
SE OF MONEY / PROPERTY 57%)
44002 Interest on Pooled Cash 34,525 10,425 10,425 2,651 (7,774) 44053 Unrealized Gains and Losses 56,875 57%)
OTHE SUBTOTAL 91,400 10,425 10,425 2,651 (7,774)
THER FINANCING SOURCES 00%
47101 Transfers In - within a Fund 1,196,268 1,196,267 1,196,267 1,196,269 l/A 47102 Transfers In - btw Govtl Funds 0 00%
SUBTOTAL 1,196,268 1,196,267 1,196,267 1,196,269
-64%)
EXF TOTAL REVENUES 1,287,668 1,206,692 1,206,692 1,198,920 (7,772)

OTHIXPENDITURES
THER CHARGES 66%)
53103 Interest on LT Debt 128,407 102,759 102,759 76,390 (26,369) 166%) OTHE SUBTOTAL 128,407 102,759 102,759 76,390 (26,369)
THER FINANCING USES 24%)
57011 Transfers Out - within a Fund 120,000 558,000 558,000 300,000 (258,000) (24%) ADMI SUBTOTAL 120,000 558,000 558,000 300,000 (258,000) 81% MIN. CONTROL ACCOUNT
59002 Advances 911,824 937,473 937,473 963,844 26,371 81% 59003 Advances Clearing 911,824) (937,473) (937,473) (963,844) (26,371) lIA

SUBTOTAL
_04%)
TOTAL EXPENDITURES 248,407 660,759 660,759 376,390 (284,369) 1 Adju:

Fljustments to Reserves/Encumbrances:
(911,824) 0
(937,473) (963,844)
F Unrealized Gain/ Loss (GASB 31) (56.875)
ENDING FUND BALANCE $550,566 $159,026 $17,712
2/26/2025
48 FY 2025-26 BUDGET

BEGINNING AND ENDING CASH SUMMARY
Section Title: [State Loan Reserve Fund
Fund/Department No: 44270 33047100 ]
Actual Estimated Adopted Requested Percent
Account Title 2023-2024 2024-2025 2024-2025 2025-26 Difference Change BEGINNING FUND BALANCE $0 $0 $0
REEGINNING FUND BALANCE $0 $0 $0

USE EVENUES

SE OF MONEY / PROPERTY V/A
0 V/A
44002 liter teres Earlas V/A
44050 Unrealized Gains and Losses 45,058 ••• ° 0 0
SUBTOTAL 45,058 0
OTHE

THER FINANCING SOURCES
47101 Transfers In - within a Fund
SUBTOTAL 000 •0°
TOTAL REVENUES 45,058
EXF

XPENDITURES
OTHE

THER FINANCING USES
57011 Transfers Out - within a Fund
100 • °

SUBTOTAL
TOTAL EXPENDITURES 0
Adjus
Isjustments to Reserves/Encumbrances:
- Unreason Gain LoSs (GAS8 31) (45,058) 8000
ENDL Rounding
NDING FUND BALANCE $0
2/26/2025
49 FY 2025-26 BUDGET

BEGINNING AND ENDING CASH SUMMARY
Section Title: Storage Facilities Revenue Bonds 2015
Fund/Department No: 4429033047500
Actual Estimated Adopted Requested Percent
Account Title 023-2024 2024-2025 2024-2025 2025-26 Difference Change BEGINNING FUND BALANCE ($17,071) $8,666 $21,216

REVENUES

USE OF MONEY / PROPERTY
(1,958) 329 329 594 265 80.54%
30,430 0 N/A
6,872 0 N/A
44050 Unrealized Gains and Losses 6,872 0 80.54%
Miscel SUBTOTAL 35,343 329 329 594 265
icellaneous Revenues N/A
46200 PY Revenue - Miscellaneous NIA

SUBTOTAL
THEI
HER FINANCING SOURCES (1.02%)
47101 Transfers In - within a Fund 477,198 476,590 476,590 471,733 (4,856) N/A 47102 Transfers In - btw Govtl Funds (1.02%)
SUBTOTAL 477,198 476,590 476,590 471,733 (4,856) (0.96%) TOTAL REVENUES 512,541 476,919 476,919 472,328 (4,591)
EXP

SERV PENDITURES
RVICES AND SUPPLIES 0.00%
51242 Bank Charges 1,179 1,500 1,500 1,500 0 0.00%
OTHEI SUBTOTAL 1,179 1,500 1,500 1,500
HER CHARGES (10.53%)
53103 Interest on LT Debt 144,521 131,327 131,327 117,500 0.00% (11,468) 5,058 (13,827) N/A
53104 Other Interest Expense 5,058 5,058
53105 Costs of Issuance N/A
53109 Capitalized Interest (10.14%)
OTHEI SUBTOTAL 133,053 136,385 136,385 122,558 (13,82T) HER FINANCING USES 27.27%
57011 Transfers Out - within a Fund 47,000 55,000 55,000 70,000 15,000 N/A 57012 Transfers Out - btw Govtl Fund 027.27%
ADMIN SUBTOTAL 47,000 55,000 55,000 70,000 15,000
MIN. CONTROL ACCOUNT 3.47%
59004 Administrative Control Account 263,876 276,541 276,541 286,145 9,604 3.47% 59005 Admin Control Acct Clearing (263,876) (276,541) (276,541) (286,145) (9,604) NIA SUBTOTAL 0.61%
TOTAL EXPENDITURES 181,231 192,885 192,885 194,058 1,173 Adjust...

Change in Principal due to Bond Reallocation
Change in Bond Premium due to Bond Realla
Capitalized Interest 0
Loss on Refunding of Debt 5,058 5,058 5,058
Principal Payment (263,876) (276,541) (286,145)
Special Fund Stmts'!B449
Amortization of Bond Premium (16,526)
Change in Reserved Fund Balance (23,358)
Unrealized Gain/ Loss (GASB 31) (6,872)
Rounding (0)
[ENDING FUND BALANCE $8,666 $21,216 $18,399
50 2/26/2025
FY 2025-26 BUDGET

BEGINNING AND ENDING CASH SUMMARY
Section Title: Common Facilities Revenue Bonds 2015
Fund/Department No: 4429533047600
Actual Estimated Adopted Requested Percent
Account Title 2023-2024 2024-2025 2024-2025 2025-26 Difference Change [BEG. FUND BALANCE $178,906 $159,769 $67,868

REVENUES

USE OF MONEY / PROPERTY
1,582 3,390 3,390 1,510 (1,881) (55.47%)
27,191 N/A
17,848 0 N/A
44U50 Unrealized Gains and Losses 11,848 U N/A
MISC SUBTOTAL 46,621 3,390 3,390 1,510 (1,881) (55.47

ISCELLANEOUS REVENUES
46200 PY Revenue - Miscellaneous 0 N/A

OTHI SUBTOTAL NIA

THER FINANCING SOURCES
47101 Transfers In - within a Fund 1,228,700 1,228,157 1,228,157 1,218,046 (10,112) (0.82 47102 Transfers In - btw Govtl Funds 0 0 0 0 0 N/A'
SUBTOTAL 1,228,700 1,228,157 1,228,157 1,218,046 (10,112) (0.82 EXF TOTAL REVENUES 1,275,321 1,231,548 1,231,548 1,219,555 (11,993) 10.97

SERIXPENDITURES
2,047 2,500 2,500 2,500 0.00
OTHI SUBTOTAL 2,047 2,500 2,500 2,500 0.0C

THER CHARGES
53103 Interest on LT Deb 124,04 392,175 392,175 358,736 (33,439) (8.53 53104 Other Interest Expense 25,008 4,516 4,516 4,516 0.0C 53105 Capta tres aerest 0 N/A
N/A
OTHI SUBTOTAL 399,036 396,691 396,691 363,252 (33,439) (8.43

THER FINANCING USES
57011 Transfers Out - within a Fund 200,000 260.000 260,000 200,000 (60.000) (23.08 57012 Transfers Out - btw Govt Fund 0 N/A:

ADMI SUBTOTAL 200,000 260,000 260,000 200,000 (60,000) (23.0E OMIN. CONTROL ACCOUNT
59004 Administrative Control Account 637,374 668,772 668,772 693,418 24,646 3.65 59005 Admin Control Acct Clearing (637,374) (668,772) (668,772) (693,418) (24,646) 3.65 SUBTOTAL 0 0 0 0 NA
Adju: TOTAL EXPENDITURES 601,082 659,191 659,191 565,752 (93,439) (14.17 0 0 0
Amortization of Bond Premium (29,523)
Capitalized Interest
Change in Reserved Fund Balance (13,146)
Loss on Refunding Debt 4,515 4,515 4,515
Unrealized Gain/ Loss (GASB 31) (17,848)
Rounding 1 (1)
ENDING FUND BALANCE $159,769 $67,868 $32,768
2/26/2025
51 FY 2025-26 BUDGET

BEGINNING AND ENDING CASH SUMMARY
Section Title: Sonoma Aqueduct Revenue Bonds 2015
Fund/Department No: 4430533047700
Actual Estimated Adopted Requested Percent
Account Title 2023-2024 2024-2025 2024-2025 2025-26 Difference Change BEGINNING FUND BALANCE $24,686 $5,855 $6,001

REVENUES

USE OF MONEY / PROPERTY
44002 uterest on Pooled. Cash 648 193 193 182 (11) (5.93%) 648 193 193 182 N/A
1 0 (!) N/A
3,730 0 (5.93%)
4,380 193 193 182 (11)
MISCE
•CELLANEOUS REVENUES N/A
46200 PY Revenue - Miscellaneous NIA
SUBTOTAL 0
OTHEF
YER FINANCING SOURCES (0.71%)
17101 Transfers In - within a Fund 37,971 37,971 37,971 37,702 (269) N/A 47102 Transfers In - btw Govtl Funds 0 0
(0.71%)
SUBTOTAL 37,971 37,971 37,971 37,702 (269) (0.74%)
TOTAL REVENUES 42,351 38,164 38,164 37,883 (281)
EXPI

SERVI PENDITURES
{VICES AND SUPPLIES 0.00%
51242 Bank Charges 362 500 500 500 0.00%
OTHER SUBTOTAL 362 500 500 500
HER CHARGES (7.67%)
53103 Interest on LT Debt 13,767 12,830 12,830 11,846 (984) N/A : 53104 Other Interest Expense (689) 0 N/A
53105 Costs of Issuance 0 (7.67%)
OTHER SUBTOTAL 13,078 12,830 12,830 11,846 (984)
HER FINANCING USES 0.00%
57011 Transfers Out - within a Fund 25,000 5,000 5,000 5,000 0 0.00% ADMIN SUBTOTAL 25,000 5,000 5,000 5,000
VIN. CONTROL ACCOUNT 3.81%
59004 Administrative Control Account 18,750 19,688 19,688 20,438 750 3.81% 59005 Admin Control Acct Clearing (18,750) (19,688) (19,688) (20,438) (750) N/A TOTAL EXPENDITURES 38,440 18,330 18,330 17,346 (984) (5.37%) Adjustments to Reserves/Encumbrances:
0 0
(18,750) (19,688) (20,438)
mortization of Bond Premiur (689)
Inrealized Gain/ Loss (GASB 31 (3,730)
Change in Reserved Fund Balance
Rounding
ENDING FUND BALANCE $5,855 $6,001 $6,100
52 2/26/2025
FY 2025-26 BUDGET

BEGINNING AND ENDING CASH SUMMARY
Section Title: [Common Facilities Revenue Bonds 2019
Fund/Department No: 44310 133047800
Actual Estimated Adopted Requested Percent
Account Title 2023-2024 2024-2025 2024-2025 2025-26 Difference Change [BEG. FUND BALANCE $631,233 $737,241 $38,313

REVENUES

SE OF MONEY / PROPER
002 Interest on Pooled Ca 17,311 12,852 12,852 993 (11,859) (92.27%) 7Q. Duuu 1 Quo, NA.
76 0 N
24,519 No)
SUBTOTAL 41,906 12,852 12,852 993 (11,859) (92.

MISC

ISCELLANEOUS REVENUES
46200 PY Revenue - Miscellaneous N-

OTHI SUBTOTAL

THER FINANCING SOURCES
47101 Transfers In - within a Func 676,992 676,356 676,356 679,114 2,758 47102 Transfers In - btw Govtl Funds 0 0
SUBTOTAL 676,992 676,356 676,356 679,114 2,758 0.%
EXF TOTAL REVENUES 718,898 689,208 689,208 680,107 (9,101) 11.

SERIXPENDITURES

ERVICES AND SUPPLIES
51242 Bank Charges 2,683 3,000 3,000 3,000 0.5
SUBTOTAL 2,683 3,000 3,000 3,000
OTHE
THER CHARGES 6)
53103 Interest on LT Debt 279,354 264,038 264,038 247,983 (16,055) (6. 53104 Other Interest Expense 0 0 N
53105 Costs of Issuance (54,724)
0 No)
OTHE SUBTOTAL 224,630 264,038 264,038 247,983 (16,055) 16.

THER FINANCING USES 6)
7011 Transfers Out - within a Fun 800,000 800,000 100,000 1700,000) (87. 7012 Transfers Out - btw Govtl Fur 0 NoT
ADMI SUBTOTAL 800,000 800,000 100,000 (700,000) (87.
2MIN. CONTROL ACCOUNT
59004 Administrative Control Account 306,33 321,098 321,098 339,551 18,453 5.6 59005 Admin Control Acct Clearing (306,334 (321,098) (321,098) (339,551) (18,453) 5.- _SUBTOTAL 0 ....No)
Adjustments to Reserves/Encumbrances:

Principal Payment (306,334) (321,098) (339,551)
Amortization of Bond Premium (54,724) 0
Unrealized Gain/ Loss (GASB 31) (24,519)
Changed in Reserved Fund Balance
Rounding
ENDING FUND BALANCE $737,241 $38,313 $27,886
2/26/2025
53 FY 2025-26 BUDGET

BEGINNING AND ENDING CASH SUMMARY
Section Title: Sonoma Aqueduct Revenue Bonds 2019
Fund/Department No: 44315 33047900
Actual Estimated Adopted Requested Percent
Account Title 2023-2024 2024-2025 2024-2025 2025-26 Difference Change BEGINNING FUND BALANCE $216,915 $164,495 $112,244

REVENUES

USE OF MONEY / PROPERTY
44002 Interest on Pooled Cash 5,917 6,389 6,389 2,528 (3,862) (60.44%) 5,917 6,389 6,389 2,528 (3,862) N/A
27 N/A
12,529 0 0 (60.44%)
18,473 6,389 6,389 2,528 (3,862)
MISS

ISCELLANEOUS REVENUES N/A
46200 PY Revenue - Miscellaneous 0 N/A
OTH (3,862)
THER FINANCING SOURCES 0.41%
47101 Transfers In - within a Fund 240,426 240.126 980 N/A 47102 Transfers In - btw Govtl Funds 240.651 241.406

0.41%
SUBTOTAL 240,651 240,426 240,426 241,406 980 (2.73%)
TOTAL REVENUES 259,124 246,815 246,815 243,933 (6,744)
EXI
SER: XPENDITURES
ERVICES AND SUPPLIES 0.00%
51242 Bank Charges 1,254 1,500 1,500 1,500 0 0.00%
OTH SUBTOTAL 1,254 1,500 1,500 1,500 0
THER CHARGES (6.08%)
53103 Interest on LT Debt 99,096 93,663 93,663 87,968 (5,695) N/A 53104 Other Interest Expense (19,412) 0 N/A
53105 Costs of Issuance 0 0 (6.08%)
OTH SUBTOTAL 79,683 93,663 93,663 87,968 (5,695)
THER FINANCING USES 0.00%
57011 Transfers Out - within a Fund 90,000 90,000 90,000 90,000 0.00% ADM SUBTOTAL 90,000 90,000 90,000 90,000
DMIN. CONTROL ACCOUNT 5.75%
59004 Administrative Control Account 08,66 113,903 113,903 120,450 6,547 5.75% 59005 Admin Control Acct Clearing 108,666 (113,903) (113,903) (120,450) (6,547) NIA SUBTOTAL 0 0
(3.08%)
TOTAL EXPENDITURES 170,937 185,163 185,163 179,468 (5,695) Adjustems to nest ves/Encumniances.

Unrealized Gains and Losses
Proceeds Bond Issuance
Restricted Cash w/Fiscal Agent 0 0
Accrual of Principal Payment - Revenue Bo (108,666) (113,903) (120,450) Principal Payment 0 0
Deposit to Cost of Issuance Fund
Bond Premium - Issuance of Revenue Bon
Amortization of Bond Premium (19,412) 0 0
Unrealized Gain/ Loss (GASB 31) (12,529) 0
Change in Reserved Fund Balance 0
Rounding (1)
ENDING FUND BALANCE $164,495 $112,244 $56,259
54 2/26/2025
FY 2025-26 BUDGET

BEGINNING AND ENDING CASH SUMMARY
Section Title: Storage Facilities Revenue Bonds 2022
Fund/Department No: 4432533048100
Actual Estimated Adopted Requested Percent
Account Title 2023-2024 2024-2025 2024-2025 2025-26 Difference Change BEG. FUND BALANCE ($10,443) $9,730 $62,767

REVENUES

USE OF MONEY / PROPERTY
44002 Interest on Pooled Cash (1,326) 1,200 1,200 1,299 99 8.26% 44003 Other Interest Earnings 173 0 0 0 N/A
44050 Unrealized Gains and Losses 22,224 0 0 N/A
• man • ana 0 •ann ~-NA
44050 Unrealized Gains and Losses ~22,224 0 0
SUBTOTAL 21,071 1,200 1,200 1,299 99 8.26%
MISCI
"SCELLANEOUS REVENUES
46200 PY Revenue - Miscellaneous 4,749 0 N/A
4,749 ° °

OTHE SUBTOTAL N/A
THER FINANCING SOURCES 4,749
47102 Transfers in - Bit Gov Funds 355,015 451,088 455,967 458,050 2,083 0.46% 0 N/A
SUBTOTAL 355,015 451,088 455,967 458,050 2,083 0.46%
SPEC

SECIAL ITEMS
48004 Residual Equity Transfers 432 0 N/A
SUBTOTAL 432 N/A
EXP TOTAL REVENUES 381,267 452,287 457,167 459,348 2,182 0.48%

SERVXPENDITURES

ERVICES AND SUPPLIES
51242 Bank Charges 720 1,000 1,000 1,000 0.00%
OTHE SUBTOTAL 720 1,000 1,000 1,000 0.00%

THER CHARGES
53103 Interest on LT Debt 119,586 165,680 165,680 154,10 (11.490) (6.94%) 53104 Other Interest Expense (32,639) 0 N/A
53105 Costs of Issuance 0 N/A
SUBTOTAL 86,947 165,680 165,680 154,190 (11,490) (6.94%) SPEC

SECIAL ITEMS
56030 Residual Equity Transfers 0 0 N/A

SUBTOTAL N/A
OTHE

THER FINANCING USES
57011 Transfers Out - within a Fund 30.000 1.232,000 1.232,000 100,000 (1,132,000) (91.88%) 57012 Transfers Out - btw Govti Fund N/A
ADMI SUBTOTAL 30,000 1,232,000 1,232,000 100,000 (1,132,000) (91.88%) SMIN. CONTROL ACCOUNT...
leaviervy 1TuirrT) (0,00i) vorui01
SUBTOTAL 0 N/A
TOTAL EXPENDITURES 117,667 1,398,680 1,398,680 255,190 (1,143,490) (81.75%) Adjustments to Reserves/Encumbrances:

Gain on Refunding (4,913)
Amortization of Bond Premium (27,727)
Proceeds from Bond Issuance
Accrual of Principal Payment - Revenue Bo (188,562) (225,570) 1283, n9) Unrealized Gain/ Loss (GASB 31) (22.224)
Rounding (2)
ENDING FUND BALANCE $9,730 $62,767 $23,811
2/26/2025
55 FY 2025-26 BUDGET

BEGINNING AND ENDING CASH SUMMARY
Section Title: Common Facilities Revenue Bonds 2022
Fund/Department No: 4433533048300
Actual Estimated Adopted Requested Percent
Account Title 2023-2024 2024-2025 2024-2025 2025-26 Difference Change BEG. FUND BALANCE $8,405,605 $5,576,812 $1,175,561

REVENUES

USE OF MONEY / PROPERTY
44002 Interest on Pooled Cash 260,878 116,082 116,082 36,826 (79,256) (68.28%) 44003 Other Interest Earnings 1,000 N/A
44050 Unrealized Gains and Losses 443,571 0 N/A
SUBTOTAL 705,449 116,082 116,082 36,826 (79,256) (68.28%) SUBIUIAL 1US,449 110,00% 170,082 50,040 (19,230) (08.28%) 4SCELLANEOUS REVENUES
46200 PY Revenue - Miscellaneous 27,402 N/A
OTHE! SUBTOTAL 27,402 N/A
*HER FINANCING SOURCES
47101 Transfers In - within a Fund 1,378,983 1,285,412 1,280,562 1,282,250 1.688 0.13% 47102 Transfers In - btw Govtl Funds N/A
SUBTOTAL 1.378,983 1,285,442 1,280,562 1,282,250 1,688 0.13% SPECI

MECIAL ITEMS
48004 Residual Equity Transfers 605 0 0 0 N/A
SUBTOTAL 605 0 0 0 N/A
EXPI TOTAL REVENUES 2,112,438 1,401,525 1,396,644 1,319,076 (77,568) (5.55%)

SERVXPENDITURES

SRVICES AND SUPPLIES
51242 Bank Charges 2,688 3,000 3,000 3,000 0 0.00%
OTHE! SUBTOTAL 2,688 3,000 3,000 3,000 0.00%
*HER CHARGES
53103 Interest on LT Debt 666,486 584,533 584,533 558,233 (26,300) (4.50%) 5 53104 Other Interest Expense (86,634) 0 0 N/A
53105 Costs of Issuance 0 0 0 N/A
SUBTOTAL 579,852 584,533 584,533 558,233 (26,300) (4.50%) SPECI

SECIAL ITEMS
56030 Residual Equity Transfers N/A

SUBTOTAL N/A
OTHEI

SHER FINANCING USES
57011 Transfers Out - within a Fund 3,299,858 3,460,000 3,460,000 100.000 (9360.000) (97.11%) 57012 Transfers Out - btw Govt Fund
ADMIN SUBTOTAL 3,299,858 3,460,000 3,460,000 100,000 (3,360,000) (97.11%) SMIN. CONTROL ACCOUNT
59004 Administrative Control Account 528,630 530,243 525,999 553,767 27,768 5.28% 59005 Admin Control Acct Clearing (528,630) (530,243) (525,999) (553,767) (27,768) 5.28%

SUBTOTAL NIA
Adjustments to Reserves/Encumbrancês: and ann TAnanaani inn nante Proceeds Bond Issuance 0
Gain on Refunding (6,879) 0
Accrual of Principal Payment - Revenue Bo (528,630) (530.243) (53.767) Principal Payment 0
Amortization of Bond Premium (79,755)
Unrealized Gain/ Loss (GASB 31) (443,571) 0 l
Changed in Reserved Fund Balance 0
Post Audit Adjustment
Change in Principal due to Refunding of De
Rounding (1.25.00) 0
ENDING FUND BALANCE $5,576,812 $1,175,561 $1,279,637
2/26/2025
56 FY 2025-26 BUDGET

BEGINNING AND ENDING CASH SUMMARY
Section Title: Sonoma Aqueduct Revenue Bonds 2022
Fund/Department No: 4433033048200
Actua Estimated Adopter Requested Percent
Account Title 2023-2024 2024-2025 2024-202: 2025-26 Difference Change BEGINNING FUND BALANCE $3,851 $36,819 $69,011

REVENUES

USE OF MONEY / PROPERTY
44002 Interest on Pooled Cash 440) 1,678 1,678 2,571 893 53.18% 44003 Other Interest Earnings 00 N/A
14050 Unrealized Gains and Losses (7,059).
4050 Unrealized Gains and Losse (7.057) 1.678 1,678 2,57 899

SUBTOTA

IISCELLANEOUS REVENUES
6200 PY SUBTO ALicellaneous 2,552
2,552
OTHER FINANCING SOURCES 17%
47101 Transfers In - within a Fund 234,526 233,940 233,940 236,208 2,268 'A 47102 Transfers In - btw Govtl Funds 0 0
17%
SUBTOTAL 234,526 233,940 233,940 236,208 2,268

SPECIAL ITEMS 'A
48004 Residual Equity Transfers 355 0 'A
• 0
SUBTOTAL 355 0 0
14%
TOTAL REVENUES 230,026 235,618 235,618 238,779 3,160

EXPENDITURES
SERVICES AND SUPPLIES 13%
51242 Bank Charges 530 350 350 600 250 13%
SUBTOTAL 530 350 350 600 250
OTHER CHARGES 14%)
65,778 58,888 58,888 51,678 (7,210)
0 0 0 'A
(24,172)
0 0 34%)
SUBTOTAL 41,606 58,888 58,888 51,678 (7,210)

SPECIAL ITEMS 'A
56030 Residual Equity Transfers 0

SUBTOTAL

THER FINANCING USE 'A
7011 Transfers Out - within a Fur A
ADMIN. CONTROL ACCOUNT*
9004 Administrative Control Accour 137,808 144,188 144,188 153,120 8,932 6.19% 9005 Admin Control Acct Clearin (137,808) (144,188) (144,188) (153,120) (8,932) 6.19% SUBTOTAL 0 0 0 N/A
TOTAL EXPENDITURES 42,136 59,238 59,238 52,278 (6,960) (11.75%) Adjustments to Reserves/Encumbrances:

Actual ament Payment Revanu Br (15%;.08) (144,188) (153,120) 0 Amortization of Bond Premium (20,132) 0
Jnrealized Gain/ Loss (GASB 31) 7,055
Rounding (2)
ENDING FUND BALANCE $36,819 $69,011 $102,392
2/26/2025
FY 2025-26 BUDGET

BEGINNING AND ENDING CASH SUMMARY
Section Title: Petaluma Aqueduct Revenue Bonds 2025
Fund/Department No: 44340 TBD
Actual Estimated Adopted Requested Percent
Account Title 2023-2024 2024-2025 2024-2025 2025-26 Difference Change BEGINNING FUND BALANCE $0 $0

REVENUES

USE OF MONEY / PROPERTY
14002 Interest on Pooled Cast 33,851 33,851 N/A
003 Other Interest Earnin 000 N/A
050 Unrealized Gains and Loss 0 0 N/A
SUBTOTAL 33,851 NIA

OTHER FINANCING SOURCES
101 Transfers In - within a Ful N/A
102 Transfers In - btw Govtl Fun 0 NA
SUBTOTAL 0 N/A

SPECIAL ITEMS
48004 Transfers In - within a Fund 0 0 N/A
SUBTOTAL 0 0 0 0

TOTAL REVENUES

EXPENDITURES

SERVICES AND SUPPLIES
51242 Bank Charges 0 480 480 N/A
0 480 480 NIA

OTHER CHARGE SUBTOTAL
53103 Interest on LT Debt 0 149,872 N/A
53104 Other Interest Expense • 000 0 0 0 N/A
53105 Costs of Issuanc 37,310 N/A
53109 Capitalized Interes 0 0 N/A
SUBTOTAL 187,182 NIA

OTHER CHARGES
56030 Interest on LT Debt 0 0 0 0 N/A

SUBTOTAL

OTHER FINANCING USES
57011 Transfers Out - within a Fund 0 1,450,000 1,450,000 N/A SUBTOTAL 1,450,000 1,450,000 NIA
ADMIN. CONTROL ACCOUNT
0 0 113,814 N/A
0 0 0 (113,814) N/A
SUBTOTAL 0
TOTAI EXPENNITIIRFS 1637 660
Adjustments to Reserves/Encumbrances:
(Increase)/Decrease in Bonds Payable
Principal Payments on Bonds
• o
Proceeds from issuance 3,513,536
Amortization of bond discount 0 0
Change in Reserved Fund Balance 0
Capitalized Interest
Amortization of deferred amount of refunc
Change in Principal - Refund of Debt • 00
Change in bond premium - Refund of Det
Unrealized Gain/ Loss (GASB 31)
Residual Equity Transfers • c
Rounding
ENDING FUND BALANCE $0 $0 $2.256.422
58 2/26/2025
FY 2025-26 BUDGET

BEGINNING AND ENDING CASH SUMMARY
Section Title: Storage Facilities Revenue Bond - 2025
Fund/Department No: 44280 [33047300
Actual Estimated Adopted Requested Percent
Account Title 2023-2024 2024-2025 2024-2025 2025-26 Difference Change BEGINNING FUND BALANCE $0 $0

REVENUES

USE OF MONEY / PROPERTY
44002 Interest on Pooled Cash 71,805 71,805 N/A
• 00 0 N/A
44003 Outer the a a and Losses 0 N/A
SUBTOTAL 71,805 71,805 N/A
JULIVIAL 11,000 •,0v0

OTHER FINANCING SOURCES
47101 Transfers In - within a Fund
47102 Transfers In - btw Govll Funds 00° 0 0 0

SUBTOTAL

SPECIAL ITEMS
48004 Transfers In - within a Fund 0 0
-
SUBTOTAL 0
-

TOTAL REVENUES
E
§ EXPENDITURES
N/A
SERVICES AND SUPPLIE!
51242 Bank Charges 799 799 NA
g SUBTOTAL - 799
799

OTHER CHARGES N/A
249,552 N/A
B8104 One here Expense • 0 249,552 N/A
000 : 0 0
53105 Costs of Issuance 62,125 62,125 NIA
• -
SUBTOTAL 311,677 311,677
g

OTHER CHARGES N/A
56030 Interest on LT Debt NIA
-

SUBTOTAL

OTHER FINANCING USES N/A
57011 Transfers Out - within a Fund 0 0 1,400,000 N/A
A SUBTOTAL 1,400,000
ADMIN. CONTROL ACCOUNT N/A
189,512 N/A
59004 Administrative Control Account 00
59005 Admin Control Acct Clearing (189,512) N/A
SUBTOTAL = 0 0 0
- _NIA
TOTAL EXPENDITURES 1,712,476
Principal payments on bonds 0
Proceeds from issuance 5,850,400
Restricted cash with trustee (reserve)
Debt Issuance Costs
(Increase) / Decrease in Bonds Payable
Amortization of bond discount 0
Amortization of deferred amount of refunding 0
Changed in Reserved Fund Balance
Unrealized Gain/ Loss (GASB 31)
Change in Principal - Refund of Debt
Change in bond premium - Refund of Debt
Residual Equity Transfers
Rounding
ENDING FUND BALANCE $0 so $4,787,015
59 2/26/2025
FY 2025-26 BUDGET

BEGINNING AND ENDING CASH SUMMARY
Section Title: Common Facilities Revenue Bonds - 2025
Fund/Department No: 4427533047200
Actual Estimated Adopted Requested Percent
Account Title 2023-2024 2024-2025 2024-2025 2025-26 Difference Change BEG. FUND BALANCE $0 SO $0

REVENUES

USE OF MONEY / PROPERTY
11002 merit on Prodi 0 231,977 231,977 N/A
231,977 231,977 N/A
0 N/A
0 0 0 N/A
OTHE! 231,977 231,977 N/A

AHER FINANCING SOURCES
47101 Transfers In - within a Fund 2,328,330 2,328,330 N/A 47102 Transfers In - btw Govtl Funds N/A
SUBTOTAL 0 2,328,330 2,328,330 N/A
SPECI
4ECIAL ITEMS
48004 Transfers In - within a Fund 0 0 N/A

SUBTOTAL N/A
EXP TOTAL REVENUES 2,560,307 2,560,307 NIA

SERVXPENDITURES

ERVICES AND SUPPLIES
51242 Bank Charges 3,222 3,222 N/A
OTHEI SUBTOTAL 3,222 3,222 N/A

SHER CHARGES
53103 Interest on LT Debt 1,006,501 1,006,501 N/A
5 53104 Other Interest Expense 000 0 N/A
53105 Costs of Issuance 0 250,565 250,565 N/A
SUBTOTAL 1,257,066 1,257,066 N/A
OTHE!

SHER CHARGES
56030 Interest on LT Debt 0 N/A

SUBTOTAL NA
0 9,400,000 9,400,000 NA
ADMIR SUBTOTAL 9,400,000 9,400,000 NIA
EMIN. CONTROL ACCOUNT
59004 Administrative Control Account : 764,346 764,346 N/A 59005 Admin Control Acct Clearing (764,346) (764,346) N/A

SUBTOTAL N/A
TOTAL EXPENDITURES 10,660,288 10,660,288 N/A
Adjust
Principal payments on bonds 0
Proceeds from issuance 23,596,064
(Increase) / Decrease in Bonds Payable
Restricted cash with trustee (reserve)
Amortization of bond discount
Amortization of bond premium
Amortization of deferred amount of refunding
Unrealized Gain/ Loss (GASB 31) 0
Change in Principal - Refund of Debt
Change in bond premium - Refund of Debt
Residual Equity Transfers
Rounding
ENDING FUND BALANCE $o $0 $15,496,082
2/26/2025
60 REVENUE BOND / STATE LOAN CHARGES - WATER RATES AND ESTIMATED REVENUES FOR FY25-26 A. ANNUAL DEBT SERVICE REQUIREMENTS
Sonoma Petaluma
Common 0&M Water Storage Pipeline Pipeline
Facilities Fund Conservation Facilities Facilities Facilities 2025 A ReVRING AL 44275 44280 44285
764,346 189,512 113,814
INTEREST 1,006,501 249,552 149,872
OTHER INTEREST - DEFERRED REFUNDING CHARGE 0 N.A
FISCAL AGENT FEES 3,222 N.A 799 480
DEBT ISSUANCE COSTS 250,565 N.A 62,125 37,310
Total Individual Bond Payments 2.024,635 N.A 501,987 301,475 Bond Reserve 303,695 N.A N.A 75,298 45,221
Total Individual Bond Debt Service 2,328,330 N.A N.A 577,285 346,697 :05
2015A Revenue Bond 44295 44290 38 N.A
PRINCIPAL 693,418 286,145 216 N.A
OTHEF INTEREST 358,736 117,500 N.A
HER INTEREST - DEFERRED REFUNDING CHARGE 4,516
FISCAL AGENT FEES 2,500

DEBT ISSUANCE COSTS
333
Total Individual Bond Payments 1,059,170
Bond Reserve 158,870
Total Individual Bond Debt Service 1,218,040
333 333 3833333
2019A Revenue Bond 44310
PRINCIPAL 339.551
3330
INTEREST 247,983
FISCAL AGENT FEES 3,000

DEBT ISSUANCE COSTS
Total Individual Bond Payments 590,534
Bond Reserve 88,581 333 533
Total Individual Bond Debt Service 679,115
2022A Revenue Bond 44335
PRINCIPAL 553,767
INTEREST 558,233 N.A 335
FISCAL AGENT FEES 3,000

DEBT ISSUANCE COSTS
Total Individual Bond Payment 1,115,000
Bond Reserv 167,250
Total Individual Bond Debt Service 1,282,250
53335 333
SRF LOAN 44265
53333 333
PRINCIPAL 963,844
INTEREST 76,390 33333 55555
Total Individual Loan Payments 1,040,234
Reserve Requirement 156,035
SHE ELSA RESERViCe 1,196,269
RESERVE N.A
Total SRF Debt Service 1,196,269
TOTAL DEBT SERVICE $6,704,009 $0 50 $1,507,069 $515,315 5346,697 LESS REV. FROM N. MARIN REV. BOND CHARGES 796,359
REMAINING REVENUE REQUIREMENT $5,907,651 $O $0 $1,507,069 S515,315 $346,697 61 REVENUE BOND / STATE LOAN CHARGES - WATER RATES AND ESTIMATED REVENUES FOR FY25-26 A. ANNUAL DEBT SERVICE REQUIREMENTS
Sonomal Petaluma
Common O&M Water Storage Pipeline
Facilities Fund Conservation Facilities Facilities Facilities B. CALCULATIONS OF WATER RATES FOR FY25-26
Commor 0&M Water Storage
Facilities Fund Conservatior Revenue Bonds Revenue Bines ene in Facilities Debt Service Debt Service Debt Service
Charge Charge Charge Charge Charge
REVENUE REQUIREMENT $5,907,650.56 $515,315 5346,697
APPLICABLE BASE WATER DELIVERIES IN A.F. 30,085.78 42,311.0 42,311.0 30,085.78 3,564.8 22,139.2 CHARGES PER ACRE-FEET $196.36 $0.00 $0.00 $50.09 $144,56 $15.66 C. CALCULATIONS OF NORTH MARIN REVENUE BONDS CHARGE

ULATIONS OF NORTH MARIN REVENUE BONDS CHARGE
13 EVENUE REQUIREMENT FOR COMMON FACILITIES DEBT SERVICE (Remaining Facilities per RA 4.3a2 $1,9455 I. MARIN'S SHARE (REV. REQMT. FOR COMMON FAC. DEBT SERVICE X (11.2/90.4 2457 ESTIMATED WATER DELIVERIES TO NORTH MARIN (IN A.F.) 39

NORTH MARIN REVENUE BONDS CHARGE
31 REVENUE REQUIREMENT FOR COMMON FACILITIES DEBT SERVICE (Additional Facilities per RA 4.3b9) 4,08:4 N. MARIN'S SHARE (REV. REQMT. FOR COMMON FAC. DEBT SERVICE X (19.9/146.2)) 565,57 STIMATED WATER DELIVERIES TO NORTH MARIN (IN A.F
ORTH MARIN REVENUE BONDS CHARG 1
Remainin
Additionaning Facilities: SRF Loan, 2015A Revenue Bond Refunding, 2022A Revenue Bond Refunding Excludedonal Facilities: 2015A Revenue Bond New Money, 2022A Revenue Bond New Money, 2025A Revenue Bond Jed: 2019A Revenue Bond - NMWD Paid Cash
FY25/26
tal
SRF LOAI Principal Interest 39
2015A RepAN 963,844 76,390 1.1945
2015A Re Revenue Bond 693,418 358,736 158,876 7,016 1,213 2015A Re Revenue Bond New Money 478,811 277,513 114,205 5,043 872 2019A Re Revenue Bond Refunding 214,606 81,223 44,670 1,973 3415 2022A Re Revenue Bond 339,551 247,983 88,581 3,000 6719 2022A Re Revenue Bond 553,767 558,233 167,250 3,000 1,288 2022A Re Revenue Bond New Money 293,067 470,246 114,806 2,059 881 2025A Re Revenue Bond Refunding 260,700 87,986 52,444 941 4030 2025A Re Revenue Bond 764,346 1,006,501 303,695 253,787 2,320 Revenue Bond New Money 764,346 1,006,501 303,695 253,787 2,32. 62 FY 2025-26 BUDGET
Water Transmission System - Fund Balances and Operating Transfers Fund Index OT Out (57012) To OT In (47101) Fund Bal. (Stmt.) Fund Bal. (Cash) Diff.

Santa Rosa Aq. Capital Fund 44230 309,921 10,587,689 10,587,688 (0) 44235 1,571,766 3,096,981 3,096,981 0
44240 0 213.191 372,609 372,609
44340 1,450,000 Petaluma AQ 346,697 2,256,422 2,256,422 Sonoma Rev Bond 2025 Fund 44285 O Sonoma AQ 0 (0) (0)
Sonoma Rev Bond 2015 Fund 44305 5,000 Sonoma AQ 37,702 6,100 6,100 noma Rev Bond 2019 FL 44315 90,000 Sonoma AQ 241,406 56,259 56,259 noma Rev Bond 2022 FL 44330 0 Sonoma AQ 236,208 102,392 102,392 Storage Rev Bond 2025 Fund 44280 1,400,000 Storage Facilities 577,285 4,787,016 4,787,015 (1) Storage Rev Bond 2015 Func 44290 70,000 Storage Facilities 471,733 18,399 18,399 (0) Storage Rev Bond 2022 Func 44325 100,000 Storage Facilities 458,050 23,811 23,811 442754325 9.400.908.00 Horage icities 2.328.338,050 15.496.033,811 15.496.083,811 Common Rev Bond 2025 Fund 44275 9,400,000 Common Facilities 2,328,330 15,496,082 15,496,082 Common Rev Bond 2015 Fund 44295 200,000 Common Facilities 1,218,046 32.768 32,768 Common Rev Bond 2019 Fund 44310 100,000 Common Facilities 679.114 27.886 27.886 Common Rev Bond 2022 Fund 44335 100,000 Common Facilities 1,282,250 1,279,637 1,279,637 State Loan Debt Service 44265 300,000 Common Facilities 1,196,269 17,712 17,712 State Loan Reserve 44270 0 -----
Capital Lease Financing 7.569585
Agency Fund (Discretionary) 44205 14,468.238 Common Failies 7,569,535 Agency Fund (Charges) 44205
Pipeline Facilities 44255 140327
Storage Facilities 44250 140,327
Common Facilities 44260 433,522 433,523
North Marin 44300 1194,000 31,616 31,616 - -
Water Management Planning 44210 82,080 82,081
Watershed Planning/Restoration 44215 1,938,370 913,891 913,891 Recycled Water & Local Supply 44220 6,000 1,247 1,247
Water Conservation 44225 2.706,900 54,714 54.714
Total 27,683,238 27,683,236 47,388,696 47,388,696
Common Facilities OT - in 47101 From
Water Transmission (discretionary
Water Transmission (Charges)
North Marin O&M Rate Computatior
2015 Bond Fund 200,000 Revenue Requirement - Transfers Out:
2019 Bond Fund 100,000 14,468.238]
2022 Bond Fund 100,000
2025 Bond Fund 9,400,000
State Loan Debt Service 300,000
10,100,000
Agency Fund (Charges) OT - Out To: Agency Fund (Charges) OT - Out To:

AQ Capital Funds Summary
Santa Rosa Aq. Capital Fund 309,921
Petaluma Aq. Capital Fund 121,766 AQ Capital Funds 549,878 Sonoma Aq. Capital Fund 118.191 Debt Service Funds 9,073,089 549,878 WT Subfunds 4,845.270
Debt Service Funds 14,468.236
Petaluma Rev Bond 2025 Fund 346,697
Sonoma Rev Bond 2015 Fund 37,702
Sonoma Rev Bond 2019 Fund 241,406 Capital Funds and North Marin Sonoma Rev Bond 2022 Fund 236,208
Sonoma Rev Bond 2025 Fund
Storage Rev Bond 2015 Fund 471,733 Total 14,468,236
Storage Rev Bond 2022 Fund 458,050
Storage Rev Bond 2025 Fund 577,285
Common Rev Bond 2015 Fund
...Common Rer Bond 2019 Fund
State Loan Debt Service
state Loan Resen
Capital Lease Financin 9,073,089
Capital Funds and North Marin
Pipeline Facilities
Storage Facilities
ommon Facilitie 0
Jorth Mari 0
WT Subfunds
Nater Management Planning 194,000
Watershed Planning/Restoration 1.938,370
Recycled Water & Local Supply 6,000
Water Conservation 2.706,900
4,845,270
Total 14,468,236
2/26/2025
63 March 3, 2025 TAC Meeting
Exhibit A Agenda Item 4
Water Transmition atem
2/21/2025
FY25/26 Reductions
Fund/Project Amount
anning Studie (200,000)
Tank Recoating Program (3,210,000)
Collector Capacity Study (300,000)
Water Transmission System Transient Analysis (50,000)
Meter and Backflow Equipment and Supplies (50,000)
Transmission and Storage Equipment and Supplies (50,000) RRIFR Mirabel Dam Salmonid Monitoring Program Screw Traps (30,000) RIFR Mirabel Dam Salmonid Monitoring Program Video Monitorin (50,000) California IRWM Roundtable of Regions (2,500)
Cathodic Protection - Maintenance (50,000)
Cathodic Protection - Site Assesment and Design Suppor (50,000) roduction and Treatment Equipment and Supplie: (30,000) Cathodic Protection - SR/Cotati (3,050,000)
Natural Hazard Reliability Study (50,000)
Water System Standards
Wohler-Mirabel Flood Resilience Alternatives Evaluation Warm Springs Dam Equipment and Supplies
Electrical/Instumentation/SCADA Equipment and Supplies
Meters - Data Management & Analysis
System Monitoring Program (25,000)
Transmission System Condition Assessments (2,150,000)
Water Management Planning
Annual Water Supply & Demand Assessment (40,000)
Urban Water Management Plan/Water Supply Allocation (50,000) Watershed Planning/Restoration
Dry Creek Habitat Enhancement - Phase 4 (500,000)
Dry Creek Habitat Enhancement - Phase 5 (467,500)
Dry Creek Habitat Enhancement - Phase 6
Winter Russian River Algae /WQ Monitoring (28,000)
RRIFR Project Management (5000
Outside Printing & Binding (6,000)
Materials and Supplies Expense (10,000)
Public Information/Outreach Programs (100,000)
Seminars, Workshops, and Training (10,000)
Petaluma Aqueduct Capital Fund
Ely BPS Flood Control & Electrical Upgrade (110,110)
Sonoma Aqueduct Capital Fund
Bennett Valley Fault Crossing (1,879,685)
Storage Facilities
Bennett Valley Fault Crossing (1,879,685)
Common Facilities
Valer rear ye idea at Phase 2 Monter/Mrabel (354,780)
(1,146,588)
Total (16,686,348)
Subtotals Amount
Agency Fund (10,037,500)
Sub Funds (1,278,000)
Capital Funds (5,370,848)
Total (16,686,348)
Notes:

All figures above are revisions to FY25/26 budget only.

Exhibit A Water Transmission System 2/21/2025
Summary of Revisions
Additional 3-Year Capital Reductions to Reduce Debt Service and Rate Increase
Fund/Project Amount
Petaluma Aqueduct Capital Fun
etaluma River Crossing (Petaluma Aq (1,025,000)
Sonoma Aqueduct Capital Fund
Bennett Valley Fault Crossing (net of grant funding) (262,565) Sonoma Creek Crossing (Lawndale/Madrone) (504,900)
Storage Facilities
Kawana-Ralphine-SBS Pipeline, Phase 1 (4,800,950)
Bennett Valley Fault Crossing (net of grant funding) (262,565) Common Facilities
Emergency Wells (Hazard Reliability Water Supply) (1,250,000) Collectors 3 and 5 Liquefaction Mitigation (net of grant funding) (17,816,345) Collector 6 Liquefaction Mitigation (100,000)
Mirabel/Wohler Maintenance and Storage Building (1,200,000) Water Treatment System Modernization - Phase 2: Wohler and Mirabel (56,736,192) Water Treatment System Modernization - Phase 3: River Road (2,764,255) Demuth Wohler Storage Building (209,555)
Mirabel Ponds Interconnection (1,000,000)
Total (87,932,327)
Subtotals Amount
Santa Rosa AQ
Petaluma AQ (1,025,000)
Sonoma AQ (767,465)
Storage (5,063,515)
Common (81,076,348)
(87,932,327)
Notes:

Figures above only incude capital costs over and above capital costs shown in the FY25/26 Reduction table.

Total Reductions (FY25/26 & Additional 3-year Capital) Amount FY25/26 Reductions (16,686,348)
Additional 3-Year Capital Reductions to Reduce Debt Service (87,932,327) Total (104,618,675)

← All documents from this meeting