PumpMan REMIT TO:

Bartley Pump PM LLC
4000 S. Moorland Ave.

Santa Rosa, CA 95407
COMMERCIAL | INDUSTRIAL I MUNICIPAL PUMP SYSTEMS T 707-584-9191 Service, Repair, Parts & Expertise F 707-584-9198
www.pumpmannorcal.com
License No. 1033562: Class A General Engineering & C-57 Drilling Contractor C-10 Electrical Contractor & C-55 Water Treatment & C-16 Fire Protection & C61/D21 Pumps and Machines DIR# 1000054366
Friday, January 31, 2025
Customer: City of Cotati
201 W. Sierra Ave.

Cotati, CA
RE: Well #3 new pumping equipment
JOBSITE: 431 Houser St
NOTE: This quote is to pull the pump, video the well, replace all of the

DESCRIPTION TAXABLE TOTAL
1 Each Gould's 8FDLC 5 stage 705GPM @ 409ft $ 10,375.70 1 Each Adder for EPOXY coating $ 3,060.00
Lead time 5-10 days
1 Each 100HP 8" SME Motor $ 13,161.40
260 Feet 6" x. 432 wall Column Pipe $ 17,127.50
270 Feet 1/0 Sub Cable 7,628.58
1 Each 1/0 Splice Kit 58.57
2 Each 6" 80 DI Check Valve $ 2,759.17
1 Lot Misc. Banding material and hardware to install the pump $ 850.00 NOTE: After pulling the pump and inspecting all of the equipment, it was determined that you need to replace everything in the well. The pump was completely worn out and as you know the motor was completely grounded. The wire needs to be replaced and I recommend replacing the column pipe as well. it has a large amount of mineral build-up inside anc Total for materials S 55,020.91
Sales Tax $ 5,502.09
Freight $ 2,000.00

LABOR DESCRIPTION
$ 5,820.00
$ 500.00
$ 1,940.00
$ 6,790.00
TOTAL $ 77,573.00
Sincerely, Do Traf
Ron Foster
Field Operations Manager