Table of Contents
1 Cover Letter 5 Project Team
Project Approach and
2 8 Resumes
Understanding
3 Scope of Work 13 Cost Proposal
municipal engineering
GREENVALLEY civil engineering
CONSULTING ENGINEERS years construction management
construction inspection
Restoring Yesterday...Creating Tomorrow
March 10, 2025
Mr. Craig Scott
City of Cotati
201 West Sierra Avenue
Cotati, CA 94931
Re: Proposal for Construction Management and Inspection Services for 2025 Street Improvement Project Dear Craig:
We have assembled a proven Green Valley team for the CM and inspection of the City's annual paving project. We are experienced with the City's standards and specifications and have a great working relationship with Harris & Associates.
Our team has worked with most of the area Contractor's and once the City has selected a Contractor, we can provide the assurance to all parties that they will be well taken care of during this slurry seal and dig-out project and impacts to the residents will be minimized as feasible, while at same time ensuring the final product meets the goals that the City has set for this paving maintenance project.
• Cost-Efficient and Timely Service. We understand the importance of the Project being completed in a timely manner to minimize traffic disruptions on Old Redwood Highway and potentially E. Cotati Avenue (dependent on Alt. Bid results) and to facilitate residents getting back on their streets after slurry seal process. We have a thorough understanding of the City's standards and would like the opportunity to show that we can put this knowledge to use on this assignment.
Our CM will stay on top of the schedule and require "look ahead" at all times for ordering supplies, coordination with the Contractor on public outreach notifications and confirming pay quantities are correct prior to progress payments. • Experience and Attention to Detail. Green Valley's proposed team has provided similar services to many other municipalities, including the City of Cotati, thus giving us the experience to bring the City the right approach and most appropriate qualifications for this project. We have an in-depth working knowledge of slurry seal applications and what to look for during the operation, including loose gravel, temperature concerns, mix design, etc. The schedule and adherence to the approved plans, as well as strong notification process will help assure the Project be completed in expeditiously.
• Team. Rick Seanor is proposed as CM for the Project. His extensive experience working with the City for the past 2+ years on CIP projects gives him the knowledge and experience to keep even the most challenging projects moving forward. We have several skilled and experienced inspectors available at this time and are proposing Matt Messenger to take the lead with Joey Petroni as back-up if required. We will schedule our lead inspector once we know the final schedule and will have our inspection team supervised by Mel Manni, who is familiar to the City staff from his work on previous projects. RGH Materials Testing will be performing the needed materials testing and documentation. It is important to note that there is no mark-up on our subconsultant fees.
We are very excited at being given the opportunity to offer Construction Management and Inspection services to the City.
If you require additional information, do not hesitate to contact me at 707.579.0388 or [email protected] Sincerely,
Fig Ellis
Liz Ellis, P.E.
335 Tesconi Circle, Santa Rosa, California 95401 • web www.gvalley.com • tel 707.579.0388 2025 STREET IMPROVEMENT PROJECT PROPOSAL
Project Approach and Understanding
The City of Cotati is advertising their annual Monitoring of weather/temperatures during street improvement project, the 2025 Street the slurry seal application to ensure Improvement Project PA#090 (Project) with the specifications are met bid opening scheduled for March 18, 2025.
Enforcement of approved traffic control
Scope of work consists of dig-out repairs only
plan for vehicular and pedestrian traffic on Olc
on Old Redwood Highway, with dig-out repairs Redwood Highway and E. Cotati Avenue - both as detailed on the plans for residential streets in
the southern City limits, west of Old Redwood very busy corridors thru the City Highway. followed by crack and slurry seal.
Coordination with the USPS, Garbage
There is a bid alternate for East Cotati Avenue service to allow for drying of slurry seal before that would incorporate 2 minor dig out repairs driving
followed by the crack and slurry seal
applications. The Project must be completed Mandatory sweeping as needed for loose within 30 working days and is anticipated to be gravel, especially in courts and dead-end streets in construction by late Spring 2025. The
engineer's estimate for this Project is $487,000
for base bid and $648,000 for base bid plus
additive alternate bid 1.
Incidental work will include pavement grinding
as needed for dig out repairs, pavement striping
removal and reapplication and traffic marking,
as well as the necessary traffic control and
property owner notifications.
Our team has reviewed the project plans and
specifications and has a completed Of most important note is the need for a strong public outreach program for the residents during
understanding of the scope of work being
the slurry seal process. We have worked with
advertised.
the City on past projects where we*......... _ 'e
Key items that our team will need to be with providing phone numbers and information proactive about during their assignment include: to the residents of what to expect from a slurry seal project and who to contact with access
& Strong and on-going public outreach by questions, etc. both the Contractor and our team due to the
disruptive nature of slurry seal applications to a Following is a general scope of services that our neighborhood team will follow for the completion of the Project and is in addition to the very thorough
8 Pre-markouts of the proposed dig-out scope that the City has provided to us on past limits and final approval by the City staff and/or projects for which we have been the responsible the designer prior to excavation by the CM and Inspection team.
Contractor to ensure quantities align with the
Bid Tab
2025 STREET IMPROVEMENT PROJECT PROPOSAL
Scope of Work
The following table highlights our anticipated scope of work for the City of Cotati - 2025 Street Improvement Project. The scope of work for this project has been broken down into sections to describe further the functions of each service and the deliverables that will be submitted. The first three tasks are a breakdown of the construction phases: pre-, during, and post-, along with the Construction Manager and Inspector responsibilities. Along with task 2, we included a breakdown of the coordination tasks that GVCE will implement into their work plan for this project. The coordination tasks focus on ensuring adequate and clear communication with the community. This communication is vital for the project's success, guarantees that the community is heard, and TASK 1 - PRE-CONSTRUCTION MEETING & START-UP
Service Function Deliverables
Preconstruction Walkthrough Inspectors perform walkthroughs of the project site and identify potentiall - Identifying Potential Obstacles List hazards/obstacles. These are mentioned in the Pre-Construction meeting and brought to the Contractors' attention.
Preconstruction Photos Take photos of the existing conditions of the Project. Photos will be taken - Digital Photos before the contractor begins working on the Project.
Preconstruction Conference The Construction Manager and the City will inform the Contractor of - Agenda project administration procedures and outline project specifics. This will - Meeting minutes allow anyone to ask any pending questions or express any concerns about the project.
Construction Management Set up a filing system for organizing, tracking, and managing paper and - Electronic files Filing System electronic correspondence. These files include recording and reviewing •Submittal Logs RFls, submittals, contracts, etc. - Status Reports
Constructability Review The Construction Managers and Inspectors will review the plans and - Detailed Word document specs and assess their constructability. They will create a detailed - Plan set with comments document with any comments and include detailed notes on the plan set to indicate what their comments are referencing
TASK 2 - CONSTRUCTION MANAGEMENT
Services Function Deliverables
Correspondence Promote project team communications through written, verbal, and - Correspondence and memos electronic communication. The Construction Manager and Inspector will keep the project teams well-informed and save electronic and spoken communication in our files.
Site Safety Construction Inspector will review and monitor the contractor's safety - Accident reports program for compliance with Cal/OSHA. Notify the contractor of any unsafe condition observed. Notify the City if the contractor refuses to rectify the hazardous condition.
Submittal Management Submittal Log with required submittals and due dates will be provided - Submittals to the Contractor, Submittals will be stamped, logged, and reviewed. - Submittal Log When needed, submittals will be forwarded to the City.
Schedule Management The Construction Manager monitors the contractor's baseline, monthly - Schedule reports CPM schedules, updates, and 3-week look ahead schedules. - Notifications of schedule status Construction Manager will notify all parties of actual or potential deviations from the schedule.
Daily Field Inspection and Construction Inspector will observe and monitor the project's daily - Daily inspection reports Documentation construction for compliance with plans and City Standards. At the end - Photos and videos of each working day, the construction Inspector will prepare a daily inspection report detailing that day's activities. Photographic and video documentation will be attached to the daily report
2025 STREET IMPROVEMENT PROJECT PROPOSAL
Request For Information The Construction Manager will review, record, and submit all RFI. RFis -RFIs will be forwarded to the appropriate party for response and returned to -RFI Submital Log the contractor once a response has been submitted
Issues Management Analyze issues, recommend appropriate advice to the City, and follow - Design clarifications their lead on how to proceed. The City will be informed every step of - Contract change orders the way.
Construction Managers The construction managers will be responsible for overseeing the - Progress Meeting project. They will ensure that construction and contract administration - Weekly Summaries - Monthly Pay Estimate
-Coordinating with Subs
Change Orders The Construction Manager will review potential change orders for - Independent cost estimates contractual and technical merit. CM will discuss with the City to - Change orders ready for execution determine if CO is warranted. Keep the City apprised of the impact of cumulative change orders.
Progress Payments Review contractor's payment requests. Verify contractor pay items. - Progress payment request documents suitable for Prepare payment documentation for execution by the City. execution by the City Weekly Meetings The Construction Manager will conduct weekly meetings with the - Agenda/Minutes Meeting Inspector, Contractor, and the City to discuss schedules, progress, and - Schedule suspense logs current and past issues.
Weekly Status Reports The Construction Manager will prepare weekly reports highlighting - Weekly report project progress, CCO, and cost issues. Included with the report are the -Updated Logs and Daily Reports inspector's daily reports, RFls, Submittals, and WSWD - Weekly States of Working Days (WSWD) TASK 2A - CONSTRUCTION MANAGEMENT - COORDINATION TASKS
Service Function Deliverables
Public Outreach Coordinate with the VCE team to print and distribute public notices - Notifications Letters with necessary information regarding the project start date, scheduling, ~ In English and Spanish as needed important paving dates, road closures, detours, and any delays. With - Information Cards this notice, the community can contact the construction manager and - Visual Infographic Cards inspector with any questions or concerns.
Subconsultants A brief outline of the services that each will perform for this project. - Subconsultant Reports Utility Coordination Coordination with PG&E, AT&T, Comcast, SMART, and all other - None potential utilities will be contacted to prevent services from being interrupted.
Emergency Responder Coordinating with the Police Department, Fire Department, -None Coordination Ambulances, and other first responders ensures emergency services are continuously provided without impeding them.
City Services Coordination Coordinating with City services such as Transit, Postal, Recycling, - None Schools, and any other services affected by the project will be notified and made aware of potential detours or closures.
TASK 3 - CLOSEOUT AND RECORD DRAWINGS
Service Function Deliverables
"As-Built" Drawings Collate, review, and transmit contractor's data. - Updated Plan Final Walkthrough The Construction Manager and Inspector will complete a final • Punch List inspection. Then, the construction inspector will prepare a punch list, which the construction manager and the City will review.
Labor Compliance Monitoring Compile all Labor Compliance reports and documentation and submit - Labor Compliance Documentation them to the City.
Final Payment The construction manager will review and process the final progress Final Progress Payment payment for the contractor. - Supplemental Documentation Claims Resolution Resolve remaining claims or disputes. Support claims negotiation and -Negotiation and litigation support provide litigation support.
Project Completion Report and Administration staff will prepare the final closeout binder or USB Drive -Final Closeout Binder, USB Drive, or OneDrive File Project Closeout or OneDrive with all pertinent files and related documentation included.
We will coordinate with the City and have it delivered. 2025 STREET IMPROVEMENT PROJECT PROPOSAL
Project Team
Your Green Valley Team City of Cotati
Public Works Director/City
Green Valley is proposing Rick Seanor in the Engineer
role of Construction Manager. Rick is very Craig Scott, P.E. familiar with the City of Cotati with his
previous work as CM for numerous CIP Principal-in-Charge/ Project Manger
projects. He is a registered P.E. with the
Liz Ellis, P.E.
relevant public works skills and experience to
guide the City through the necessary Construction Manager documentation to satisfy any funding Rick Seanor
requirements and to keep the Project on track
Field Foreman Office Engineer
for successful completion. Rick is currently
Mel Manni Danny Camach
available for the assignment. Our proposed
inspector, Matt Messenger, has extensive
Construction Inspector Materials Testing
experience of paving projects with recent work
Matt Messenger RGH
on the West Side Streets Improvements Joey Peroni
Project and the 2020 Paving and Street
Improvement Project for the City, among other
more recent Cotati assignments. Both know residents and businesses that are impacted by the importance of public outreach and the actual work. He has an ability to explain the coordination with the Contractor and City staff potential impacts before they happen and thus during critical dig-out and paving schedules. alleviates concerns before they reach a point that City Administrators are notified.
In addition to Matt Messenger we have several
exceptionally qualified inspectors that would Listed below are highlights of our proposed be available for this assignment as back-up if team members. Resumes detailing our team's needed, including Joey Petroni. We have specific experience follow for your review. We included the resumes and brief outline of both can provide additional information upon inspectors. Matt is very familiar to Cotati as he request. References can be provided for all worked directly for the City or within the City
upon request.
limits on other assignments. Both Matt and
Joey have worked on identical type Project Staffing
assignments for the Town of Windsor and City
of Santa Rosa, and they understand the We anticipate the need for a part-time CM, a technical details of slurry application, need to full-time inspector and support staff on an as- quantify dig-outs prior to construction, needed basis for each project that is assigned strongly enforced traffic control measures, and to our team. We will provide any needed on-going outreach to the public and residents materials testing or oversight by our Both are very adept at translating the proiect subconsultant RGH Engineers. If labor specifications directly to the Contractor to compliance help is requested, we will provide minimize the questions that might otherwise these services via a subconsultant. We have take the time of the designer and City staff. highlighted key team members below for your Likewise. Rick follows a strict checklist to review while detailed resumes for our team can ensure that all contract, materials testing, and be found in the Appendix. project completion requirements are met. He
is highly regarded by our clients, as well as the
2025 STREET IMPROVEMENT PROJECT PROPOSAL
Liz Ellis, P.E. Senior Project/Contract Manager (C050830) Liz will be your Project/Contract Manager for this contract. She is a licensed Civil Engineer with over 25 years of municipal infrastructure experience. As Principal-in-Charge of Green Valley, Liz will bring you the commitment and project ownership she brings to all Green Valley assignments. She is passionate about excelling in her career and business and, more recently, the construction side of public infrastructure. She works closely throughout Northern California to meet their changing needs and requirements. In addition, she will bring her usual enthusiasm and positive attitude to this team to ensure another successful Project for the City! Liz will be responsible for the following:
• Meeting all contractual obligations
• Budget and scheduling requirements for the CM/Inspection contract went or any rese race ones be me civ • Coordination and management of any requested Public Outreach by the City • Green Valley Public outreach
Her public outreach methods and support team make Green Valley unique within the construction industry and serve to benefit our client's relationship with the neighborhoods they are working in. Additionally, she understands that the livelihood and careers of exceptionally talented individuals ride on her ability to keep Green Valley's clients happy and returning.
Rick Seanor P.E., Construction Manager
Rick is a licensed Civil Engineer with decades of public works experience managing both large- and small-scale CIP projects while with the City of Ukiah. Rick is multi-faceted leader who has organized and shepherded diverse teams through multi-million-dollar construction projects - from groundbreaking through ribbon-cutting. In short, Rick understands what it takes to move a project from paper into and through the field component of construction and can facilitate issues as they arise to minimize delays in construction and to keep budgets within bid allowances. He assists with field engineering, timely materials procurement, pro-active traffic management, document control, and financial tracking. Since joining Green Valley, Rick has served as a Construction Manager for several projects for the City of Santa Rosa Public Works, including the Mayacamas Pump Station Roof Replacement Project. He works well with all of the GV inspectors, and he and Matt are a great team for any CIP Project. He and Matt have completed many of Cotati's Street Projects, including the recent West Side Streets Improvement Project and the City of Cotati's 2020 Street Reconstruction Project and the City's 2021 Pavement Preservation Project.
Matthew Messenger, Construction Inspector
Matt has over 25 years of experience in the surveying and construction industry and recently spent the last 4 years as inspector for Green Valley on two large downtown paving jobs for City of Cotati and City of Rohnert Park, as well as working as the encroachment inspector for City of Rohnert Park under the direction of George Frostick. Recent Cotati experience includes lead inspector for the West Side Streets Improvement Project, and the 2023 Pavement Rehabilitation Project which was in 2025 STREET IMPROVEMENT PROJECT PROPOSAL
various neighborhoods of Cotati. His experience includes street and roadway reconstruction and pavement rehabilitation, water and sewer main projects, and storm drain installations. He was also responsible for the City of Cotati's Pavement Re-surfacing Project on Old Redwood Highway and East Cotati Avenue and has a thorough understanding of CIP and paving methods and standards.
He is known for educating and keeping residents informed of construction activities and minimizing any possible delays to project progress. He has been commended for his construction oversight skills from his clients, local businesses and residents, and project superintendents for turning what could be difficult situations into pleasant and accommodating experiences.
Joey Petroni, Construction Inspector
Joey is an experienced Construction Inspector who has experience working both on the Contractor side and on the inspection side of municipal infrastructure projects. He recently was inspector on the County of Sonoma's large scale paving improvement project and the reconstruction of Sonoma Avenue in the City of Santa Rosa. Sonoma Avenue included over 19 new ADA ramps with extensive conforms and utility coordination required for vaults, poles, etc. He familiarizes himself with all the relevant standards and applicable codes and works closely with City representatives to ensure they are satisfied with the product before final acceptance. His experience includes water, sewer and storm drain infrastructure, as well as bike and pedestrian trails, ADA ramps, curb and gutter, streetlights and all components of paving.
RGH Consultants, Geotechnical Consultant
RGH Consultants is a geotechnical engineering and consulting firm that RGH was founded in 1991 and offers over 30 years of experience in the geotechnical field. They provide in-depth and insightful analysis to help their clients better understand the ground and materials their projects are built upon. RGH's team has decades of combined experience working with construction, public works, wineries, and more.
Their suite of services includes geotechnical engineering, geological services, soil and material testing, and special inspection services. They have worked with wineries, dams, and reservoirs as well as hospitals, schools, residences, and many other types of buildings.
Additionally, the company now offers additional services such as soil and materials testing in its comprehensive lab giving the client rock-solid geological and geotechnical services.
Their Caltrans-certified laboratory has its equipment maintained and inspected on a regular basis, with quality adherent to the National Bureau of Standards. Other accreditations include the American Association of State Highway and Transportation Officials and the Division of the State Architect, ensuring that the laboratory is certified for work on projects that will be used by the public, including public schools. 2025 STREET IMPROVEMENT PROJECT PROPOSAL -
Resumes
LIz ELLIS, P.E. 25
GREENVALLEY
PRINCIPAL-IN-CHARGE & PROJECT MANAGER years
CONSULTING ENGINEERS
Liz Ellis founded Green Valley Consulting Engineers in 1997 after spending 15 years in public and private sectors in pursuit of her vision to restore and enhance "Liz - Thank communities and the lives of their residents. Liz is a multiple award-winning, industry- you for accommodating
recognized Project Manager who has led hundreds of Capital Improvement Projects us on this project - many Federally-Funded - to successful completion during her 20 years in all-local and all others! business. Liz personally monitors daily operations, performs overall quality assurance We Love working and control, leads public outreach efforts (as required), and serves as the 24/7 with Green Valley!"
client contact on each of our construction projects. She is known for her innovative, sustainable, and cost-saving approach when it comes to design alternatives and field - Adeline Leyba solutions. Her projects boast the industry recognition to prove it! City of Clearlake Dam Road Project
RELATED PROJECT MANAGEMENT ExPERIENCE
2019 Fulton Road Reconstruction, City of Santa Rosa. This high-profile $4M pilot pavement project set the precedent for future roadway rebuilds throughout the Bay Area. Faced with cost-prohibitive bids and Education high cost of traditional building materials (post-wildfires), the City chose a novel approach for reconstructing B.S./Civil Engineering this mile-long stretch of Fulton Road. Roller-Compacted Concrete (RCC) proved an ideal alternative given its San Francisco State University successful use in other structural applications (dams & runways). Additionally, she provided exceptional Professional Registration public outreach to ensure neighborhood safety and satisfaction given haul routes which extended through the residential streets of the City's west end. Project success also hinged on achieving smooth HMA Civil/CA C50830
pavement transitions at numerous intersections and side streets.
Professional Affiliations Highway 12 Corridor Improv ment Project Phase II, Stage 2, County of Sonoma. (Construction ACEC/ASCE/CMAA Member Management & Inspection) $6M construction project which rehabilitated State Route 12 within "The Springs" area of Sonoma County. Included roadway widening to accommodate a protected center turn Business Awards lane, asphalt pavement replacement, traffic signal modifications, and the installation of curbs/gutters/ADA • 2020 Community sidewalks, bidirectional, decorative street lighting, stormwater treatment devices, and pedestrian amenities.
Philanthropy Award Winner Challenges included finding and relocating a large number of existing underground utilities (electric, gas, • 2015 NBBJ Philanthropy Award cable, and AT&T); minimizing disruptions to adjacent commercial parking lots and driveways; public outreach • 2007 & 2004 NBBJ Women for the scheduling/sequencing of work with stakeholders, nighttime paving operations, and daily field in Business Award engineering. Required extensive Caltrans coordination and approvals.
PROJECT AWARDS Stony Point Road Reconstruction & Widening Project, Phases 1 and 2, City of Santa Rosa: (Overall Project Management, Surveying, Engineering Support, On-Call Construction Inspection) $10M construction • 2024 ACEC Excellence in
($32M total) project which improved this principal arterial roadway between Highway 12 and Hearn Avenue Engineering Award Winner:
Town of Windsor, River within Southwest Santa Rosa. Elements included complete pavement reconstruction w/ a fiber reinforced Road Roundabout Project asphalt concrete to increase longevity, additional travel lanes, designated bike lanes on both sides of the • 2021 CEAC Outstanding Local street, new ADA sidewalks and curb ramps, traffic signal improvements at six intersections, landscaped Streets and Roads: Fulton median installation, street lighting enhancements, the construction of permanent sound/retaining walls, and Road Reconstruction, Phase 1 the widening of an existing culvert bridge (Roseland Creek). • 2017 ASCE Outstanding Jaguar Way/Windsor Road Bicycle and Pedestrian Improvements, Town of Windsor - Building Bikeways and Trails Project of
the Year: Jaquar Way/Windsor Division: ASCE Outstanding Bikeways and Trails Project of the Year (Construction Management and Road Bicycle and Pedestrian Inspection) A Caltrans-administered "complete street" project funded by the One Bay Area Grant (OBAG) Improvements Project Program. Featured a new traffic signal at the main Windsor High School crossing frequented by 1,700 • 2016 ACEC Engineering students daily, the addition of ADA sidewalks and ramps, crosswalks with pedestrian pushbuttons, green Excellence Award: Fort bike lanes, designated turn lanes, on-street parallel parking, and an HMA overlay w/markings and striping.
Bragg Coastal Restoration Involved daily coordination with school administration for the safe student movement; adjacent Windsor Fire and Trail Project
Station No. 2 for constant emergency vehicle movement; and the Town's Public Works Department for staff • 2011 ASCE Sustainable activities. Developed temporary pedestrian/public transit detours and ADA measures.
Technology Project of the Year
& 2012 ACEC Engineering Multiple Sewer and Water Main Replacements with Complete Street Reconstructions: (Construction Excellence Award: Laguna
Force Main Replacement Management and Inspection) Utilities Capital Improvements with full pavement reconstructions within • 2011 ACEC Special Project residential neighborhoods and high-traffic commercial areas throughout Santa Rosa. Locations/Projects of the Year: Mark West included: 1.) Montgomery Drive; 2) King Street; 3) Illinois Ave. and Sucher Lane; 4.) Franquette Ave. and Quarry Solar Panel Project Patio Court; 5.) Montgomery Drive, Pierce Street, and 2nd Streets. • 2011 Santa Rosa Chamber Petaluma Boulevard South Road Diet Project, City of Petaluma: (Surveying, Civil Engineering & of Commerce Bob Blanchard Landscape Design, Environmental Documentation, Traffic Engineering, Bidding & Construction Leadership Award Support) Re-configuration of approximately a half a mile of Petaluma Boulevard South, a major urban • 2009 ASCE Outstanding connector street extending through the heart of Petaluma. The 'diet' reduced a total of four traffic lanes to Small Transportation Project
of the Year: Fort Bragg two and created a center two-way left turn lane to construct a complete street. Elements included pavement Downtown Streetscape micro-surfacing with new striping/markings/markers, traffic signal modifications, and the installation of • 2008 ASCE Riverfront ADA curb ramps, audible pedestrian crossing signals, new crosswalk striping, bike lanes, street furniture and Urban Transformation landscaping. Participated in City public outreach efforts to address community concerns and questions prior to construction.
Green Valley Consulting Engineers
RICHARD SEANOR 25
GREENVALLEY
CONSTRUCTION MANAGER CONSULTING ENGINEERS years
RELATED PROJECT ExPERIENCE
2023 Pavement Rehabilitation Project, City of Cotati: Rick was the CM in charge of this project that encompassed the rehabilitation of 1.5 miles of City streets, utilizing slurry seal and Full Depth Reclamation (FDR) methods. He oversaw demolition, clearing, dig-out repairs, crack sealing, and the application of Type Il slurry seal. Inspected FDR with cement/lime treatment to a depth of 11 inches and the placement of over 6,000 tons of hot mix asphalt (HMA) overlay. "...we have had a great
Responsibilities included full administration of monthly progress payments, experience with Rick and Matthew managing the
holding weekly on-site meetings, preparation and processing of change orders, project, and couldn't be coordination of media postings, managing submittals, RFI's and field directives. happier with the end product. Thanks again for
He ensured compliance with standards for the removal and replacement of all you guys do to help us nine ADA pedestrian ramps, PCC sidewalk, curb and gutter, utility adjustments, deliver successful paving projects!"
Education striping, and pavement markers. Assisted with public outreach efforts to South Dakota School of minimize disruptions and supported the project's successful on-schedule - Jon Caldwell completion with minimal punch list items and no construction claims City of Cotati Mines and Technology 2020 Pavement Preservation
Bachelor of Science Civil
Shiloh Hills Back-Up Generator Project, Town of Windsor: Rick Engineering
provided construction management services for the Town on this critical fire safety and emergency Training & Certifications back-up project. He also managed the specialty inspection and materials testing services. Shiloh • Low Impact Development Hills Back-Up Generator Project, aimed at enhancing fire safety during power outages and wildfire Training events was funded by a State of California PSPS grant and involved installing two 150KW propane- • Graduate Level fueled generators at 2 separate water storage/pumping stations in the steep and wooded Shiloh Groundwater Course Hills Development. Significant and challenging site improvements included concrete footings on • FEMA Floodplan Mangement steep terrain, slabs, electrical subpanels, automatic transfer switches, and new safety fencing - all • Asphalt Pavement within a very tight footprint and overlaid with multiple easements to work around. Specialty cranes Fundamentals
were brought in for the installation of the generators due to tree cover and access limits. The Project • Enviromental Health
required Rick to work on multiple schedules to coordinate the long lead times for the specialized Orientation
equipment as well as supplier provided propane tanks. Rick also oversaw specialized tracking of • Pumps and Controls
materials and expenses when preparing progress payments for the unique funding requirements. • Water Well Drilling
• ArcGIS West Side Streets Project, City of Cotati: Rick was the Construction Manager responsible for • Post Earthquake Safety this $4M pavement rehabilitation project that incorporated a number of paving methods including Evaluation of Buildings asphalt overlay, full-depth reclamation (FDR), and slurry seal to improve road conditions across the California Stormwater city's West side and downtown. Rick developed and executed a proactive communication plan to Quality Association (CASQA) notify residents and businesses of construction impacts, preventing confusion and ensuring minimal • Annual Stormwater disruption. He ensured compliance with a comprehensive Traffic Control Program (TCP) to reduce Conference
neighborhood inconvenience and coordinated ADA-compliant curb ramp upgrades and successfully Construction Safety completed the project under budget with a minimal punch list and no construction claims. • Hazardous Materials
First Responder Ives Park Path Improvements, City of Sebastopol: Rick provided comprehensive Construction Operational Course Management (CM) services for the Ives Park Path Improvements Project in downtown Sebastopol, funded by Measure M. Collaborated with City staff from preconstruction to project completion, overseeing Organizations
• Volunteer, State of weekly meetings, submittal reviews, progress payment administration, punchlist management, and California OES final project acceptance. Key improvements included the removal of deteriorated paths, installation • Member, American Society of new asphalt paths, and site grading. Successfully implemented value engineering to avoid budget of Civil Engineers overruns and change orders, while maintaining public safety and minimizing disruptions in a high-traffic • Past President, Lake park. Managed challenges including public use and safety through strategic barriers and fencing.
Mendocino Engineer's
Association Macayamas Pump Station Roof Replacement, City of Santa Rosa: Rick provided Construction • Past President, Ukiah Management services for the replacement of a fire-damaged "living roof" at a remote wastewater Wheelers Bicycle Club pump station in the Macayamas Hills. Rick oversaw the removal of a "living roof" and installation of a durable KEE-enhanced PVC roofing system while maintaining 24/7 pump station operations. Coordinated logistics in a challenging location with restricted site access, strict environmental permitting, and time limitations. Work included extensive repair to roof hatches, new louvers, masonry veneer repairs and modifications to exterior lighting system. Rick successfully managed the construction process within a 20-day window, ensuring compliance with FM Global standards and avoiding liquidated damages. 10 Green Valley Consulting Engineers
MATTHEW MESSENGER 25
GREENVALLEY
CONSTRUCTION INSPECTOR CONSULTING ENGINEERS years
Seasoned Construction Inspector with over 15 years of specialized experience in quality assurance and compliance for municipal Capital Improvement Projects (CIPs). Demonstrated expertise in performing technically challenging inspection assignments, ensuring adherence to technical specifications, and documenting field conditions with precision. Adept in advanced construction staking techniques, overseeing comprehensive materials testing, and maintaining meticulous project documentation. Exhibits exceptional problem-solving skills and an acute attention to detail. Distinguished for a strong commitment to upholding project standards and specifications, effectively liaising with diverse stakeholders including arborists, specialty biologists, permitting representatives, and Caltrans officials. Proven ability to facilitate robust communication and collaboration across various disciplines to ensure successful project outcomes.
RELATED PROJECT ExPERIENCE
Albany, Clement & Malano Sewer & Water Improvements, City of Santa Rosa: Matt was the lead inspector for this $3.4 million multi-year utility and pavement rehabilitation project near Santa Rosa Junior College. The project involved replacing outdated water and sewer mains with new 8" water and 8" and Education 10" sewer PVC lines and replacing all water and sewer services and laterals. Work included upgrading A.S./Santa Rosa Junior College storm drainage systems, replacing pedestrian ramps to meet current ADA standards, and reconstruction of Civil Engineering Technology pavement, curbs, and sidewalks. Throughout the duration rigorous adherence to specs and standards was Certificate kept while challenges included unstable subgrade and soil contamination. Work included coordination with arborists, geotechs and hydro geologists, a robust public outreach program kept residents and SRJC Focused Experience
• Successful North Bay
Site Contractor & 2024 Cotati Pavement Preservation, City of Cotati: Matt provided F/T inspection and coordinated Business Co-owner materials testing services for the City's annual pavement preservation project that covered multiple • Heavy Equipment Operator neighborhoods in the City limits. His responsibilities included marking pavement failures, identifying iron • Earthwork & Excavation for features, and conducting public outreach to keep local businesses and residents informed about potential Residential & Commercial disruptions. He inspected the dig-out pavement repairs, crack sealing, sandblasting, and vacuum removal of Development old markings, and oversaw street sweeping before inspection of the over 30,500 square yards of polymer- • Utility Trenching modified slurry seal. Additionally, he was responsible for inspection of two pedestrian ramps brought up to • Land Surveying Technician current ADA standards. His attention to detail and ability to keep residents and businesses informed 24/7 has made Matt key to the success of all of Cotati's recent PPP Projects. • Construction Site Supervisor
Remote/International Delta Pond Diffuser Maintenance Project, City of Santa Rosa: Matt was the on-site inspector for this Construction Sites
high-priority maintenance project for the City's Treatment Plant, overseeing the duties of full-time inspection, Training & Certifications stormwater monitoring and reporting, and biological monitoring within the environmentally sensitive Santa Rosa Creek. Responsible for the dredging of 300+ cubic yards of sediment from 24" duck bill Construction Safety valves, located in the Creek, ensuring compliance with biohazard testing and stringent permit regulations. • Heartsaver First Aid/ Supervised the installation of turbidity curtains, twice-daily turbidity monitoring, and the use of hydrological CPR/AED (Current) and mechanical dredging methods to minimize environmental impact. Coordinated closely with contractors • AECDaily Accessibility & and permitting representatives, maintaining 24/7 communication, and successfully restored the site through Detectable Warning Systems hydroseeding efforts, completing the project within critical permit deadlines. • Sustainable Water &
Stormwater Mangement 2023 Pavement Rehabilitation Project, City of Cotati: Matt provided inspection services for the • Design for Plantable rehabilitation of 1.5 miles of city streets, utilizing slurry seal and Full Depth Reclamation (FDR) methods.
Permeable Pavement Oversaw demolition, clearing, dig-out repairs, crack sealing, and the application of Type I slurry seal. • Construction Management: Inspected FDR with cement/lime treatment to a depth of 11 inches and the placement of over 6,000 tons of Concrete Foundations hot mix asphalt (HMA) overlay. Responsibilities included ensuring compliance with standards for the removal Heavy Equipment Operator and replacement of nine ADA pedestrian ramps, PCC sidewalk, curb and gutter, utility adjustments, striping, and pavement markers. Assisted with public outreach efforts to minimize disruptions and supported the • Excavator
project's successful on-schedule completion with minimal punch list items and no construction claims. • Trencher
• Forklift 2022 Pavement Preservation Project, Town of Windsor: Inspector for this fast-paced Type II Microsurfacing and Asphalt Rubber Chip Seal project. Responsible for coordination of materials testing "...thanks to the Green Valley services as well as extensive public outreach efforts. The project included over 95,000 square yards of Type team for always going the
extra mile and doing all you do Il micro surfacing and 85,000 square yards of asphalt rubber chip seal, requiring precise monitoring of to make our paving projects a temperatures and application timing. Inspection duties involved mark out of pavement failures, inspection success!"
of HMA repairs, and overseeing crack sealing, striping preparation, and final street markings. Challenges Jonathan Caldwell
City of Cotati included heavy traffic volumes on main Town streets, necessitating that 1 lane of traffic be kept open at all times, as well as working around school events and holidays. 2019 Street Construction Improvements, City of Cotati: Inspector for a significant $2.25M rehabilitation of an extensive paving rehabilitation in the heart of downtown Cotati and surrounding neighborhoods. The aggressive schedule required multiple weeks of both day work and round the clock night work and on- going public outreach with the business owners and residents. The work included mill grind and overlay of the heavily trafficked Old Redwood Highway and East Cotati Avenue, and various width pavements (avenues & courts) within the City's residential "L Section" just south of East Cotati Avenue.
Green Valley Consulting Engineers
JOEY PETRONI 25
GREENVALLEY
CONSTRUCTION INSPECTOR CONSULTING ENGINEERS years
Joey has over 25 years of experience working in the construction industry. With his construction experience, Joey has accumulated knowledge in sewer and water main work, retaining walls, and significant paving projects. He obtained considerable amount of expertise working with two large civil construction contractors, which assisted him well when transitioning to the Green Valley Consulting Engineering team. His knowledge has aided him in successfully undertaking various projects and he satisfies clients with the quality of work he delivers. Since working with Green Valley, Joey's versatility in various areas of the construction field aided him in consistently keeping up with fast-paced projects and working with contractors to meet the client's goals and standards.
RELATED PROJECT ExPERIENCE
Sonoma Ave. Pavement Rehabilitation - E St. to Bobelaine Dr., City of Santa Rosa: Senior inspector for a $4.4M pavement rehabilitation project on one of Santa Rosa's key east-west corridors, funded in part by SB1. Responsibilities included oversight of milling and asphalt overlay operations, pavement Training & Certifications grid installation, and raising utilities to grade. Inspected the installation of 75+ water service laterals, 29 ADA-compliant ramps, traffic signal modifications, and new pavement markings. He played a key Inspection Requirements role in stakeholder coordination, ensuring minimal disruptions to residents, businesses, and emergency • CCI-o Concrete Paving services through proactive public outreach. The project successfully improved roadway conditions, utility • CCI-06 Inspection of Asphalt- infrastructure, and pedestrian accessibility while maintaining traffic flow and safety.
Rubber Pavement Materials
• Construction Inspection 2023 Road Sealant Phase 1, County of Marin: Construction Inspector for the County of Marin's annual of Traffic Signals road sealant program. The 2-phase project was located in the "Country Club" vicinity of San Rafael and the limits of rural Lucas Valley Rd in Nicasio Valley. Responsibilities for the fast track $600,000 Type 2 slurry • ADA / Accessibility &
Detectable Warning project included extensive coordination with residents, ranchers and County officials, weekly meetings, Systems: Complying with progress payments, and final close-out documentation. Challenges included traffic control on rural county Government Guidelines roads, identification of dig-outs and repairs and strict temperature controls for sealant application that was • CalAPA - Asphalt impacted by west Marin's wet, foggy cold spring weather.
Pavement 101
2022 Pavement Digout Project Phase 2, County of Marin: Joey served as Construction Inspector • Hazmat Certification
for the County of Marin's annual pavement dig-out project, providing oversight on asphalt concrete • ADA Compliant Curb Ramps grinding and paving, monument box adjustments, traffic control, and stormwater pollution prevention. • Causes and Prevention Responsibilities included identifying and re-marking dig-out locations, adjusting dimensions based on of Concrete Surface
updated pavement conditions, and coordinating closely with contractors to ensure strict adherence to Imperfections
traffic control measures and project schedules across multiple residential streets in Central San Rafael.
Construction Safety Monitored pavement excavation to a depth of 4 inches and backfilling with Hot Mix Asphalt (HMA) in two • First Aide / CPR lifts, ensuring quality and compliance with project specifications. Additionally, managed public outreach Certification (current) by notifying residents of upcoming work and providing schedule updates, contributing to the successful Skills & Trades completion of the fast-paced project within the 20-working-day timeline. • Heavy Equipment Operation 2022 Central Region Road Rehabilitation Project, County of Marin: Joey provided comprehensive • Underground Utilities Inspection services for this $2.6M road rehabilitation project funded by TAM's Measure AA and Measure B. The project involved resurfacing 6 lane miles of roadway, asphalt dig-outs for base repairs, pavement • Paving and Concrete Work
grinding, concrete curb, gutter, and sidewalk replacements, minor storm drainage improvements, "Erich and / were recently installation of 7 ADA-compliant curb ramps, new roadway striping, and construction of a retaining wall. discussing the North Trunk Work required careful traffic control, including lane closures, detours, and flagging, with strict limits on Sewer Project currently traffic delays to minimize public disruption. underway and both realized
that the threshold described Pacific Avenue Reconstruction Project, City of Santa Rosa: Joey was the lead inspector on the below warranted pausing replacement of 1000 lineal feet of existing PVC water main within Pacific Ave. at Humboldt Street and celebrating 'what just
Of note, the bore intersection due to hydrocarbons that were detected in the subgrade. The 8" and 10" water main and jack process is done, ana replacement was located directly down the centerline of a very busy main thoroughfare which required roduced what was intended constant oversite of traffic control measures, road detours, and advance signage. Inspection required the rose space his is o in-depth knowledge of the City of Santa Rosa's blanket waivers to allow for this main to be installed near This water main replacement was installed without additional delay to the travelling public and completed within the estimated cost provided during design. Numerous appurtenances were installed "tees" at the intersection, new hydrants, mainline valves and water secluding significens mainline valve ede byal intersection, new hydrants mailine y all, for very deep sewers in
narrow construction corridors North Trunk Sewer Main Installation Project, City of Santa Rosa: One of the two primary inspectors which was the condition on this significant CIP infrastructure project that was almost 2 years in construction and had a dedicated a fair amount of thie third party media communications firm involved for the on-going public outreach efforts. The Project particular project area. The
eam essentially built a sewer upgraded a deteriorating 50 yr old sewer trunk main via a combination of conventional open-cut through a hill, in a sense. installations and various methods of trenchless technologies in very challenging geotechnical conditions. - Mike Prinz, Deputy Director Conditions required night, weekend and sometimes 24/7 inspection coverage. Joey was recognized City of Santa Rosa by residents for his diligence in following up on issues associated with off hour work, and work directly Vorth Trunk Sewer Replacement
impacting their homes. 12
Green Valley Consulting Engineers
2025 STREET IMPROVEMENT PROJECT PROPOSALI
Cost Proposal
Our fee estimate, which follows, is based on 30 working days with a part-time construction manager working 3 hours per day and a full-time inspector. We do not anticipate that the CM will need 3 hours per day - but find that slurry seal work can be fast moving and might necessitate more hours than normal during key operations.
Additionally, we have added a field superintendent role to our inspection staff. We have found that this role benefits our clients, especially on complex or long-term Projects.
The costs associated with our team's public outreach are included in our fee, but we feel these minimal costs are always worth 10x the value in the benefit they provide to the neighborhood.
The State of CA DIR has already issued pre-published increases for prevailing wage rates (PW) that we are required to meet. Consequently, we have set up our fee sheet to show these rate increases as they correspond to the published dates of the State DIR.
It is important to note that Green Valley does NOT mark up any of our subconsultant fees or reimbursements.... they are passed on with no markup!
We welcome the opportunity to discuss our fee and associated scope of work as necessary to meet the City's goal for this project. We have allotted additional time at the start-up and close-out of the project to allow for file set-up.
Detailed Fee Estimate for Construction Management & Inspection Project Schedule
Phases 25
Project Information Jan Feb March Apr May Jul Aug Sept Oct Nov Dec Total Cost City of Cotati Pre-Construction 5,340.00 years
2025 Street Improvement Project PA#090 Construction Management $ 62,215.00 GREENVALLEY March 10, 2025 Project Closeout 2,900.00 CONSULTING ENGINEERS Hourly Rates Oct
Role Jan Feb Mar Apr May Jun Jul Aug Sep Nov Dec Total Hours Total Cost 7/1/24 - 6/30/25
Task 1 - Pre-Construction Meeting & Start-Up
Project Manager Liz Ellis $200.00 400.00
Construction Manager Rick Seanor $180.00 2,880.00
Field Superintendent Mel Manni $175.00 un en es es 700.00 Construction Inspection Matt Messenger $170.00 1,020.00 Administration Amnie Kohl $85.00 340.00
ask 1 Subtotal: 5,340.00
Task 2 - Construction Management
Project Manager $180.00 1,440.00
Construction Manager Rick Seanor $180.00 12,600.00
Field Superintendent Mel Manni $170.00 2,720.00
Construction Inspection - Day Matt Messenger $175.00 42,000.00 Construction Inspection - Day (OT) Matt Messenger $185.00 10 es es es es us es es es es 2,775.00 Construction Inspection - Day (DOT) Matt Messenger $210.00 Construction Inspection - Night Matt Messenger $200.00
Construction Inspection - Night (OT) Matt Messenger $220.00 Construction Inspection - Night (DOT) Matt Messenger $250.00 Administration Amnio Kohl $85.00 680.00
Task 2 Subtotal: 235 357 62.215.00
Task 3 - Closeout and Record Drawings
Project Manager Liz Ellis $200.00 400.00
Construction Manager Rick Seanor $180.00 2,160.00
Field Superintendent Mel Manni $175.00
Construction Inspection Matt Messenger $170.00
Arnio Kohl $85.00 340.00
Task 3 Subtotal 2,900.00
Totals 253 70.455.00
Subconsultants Total Cost
Geotech RGH 10,000.00
Subconsultants Subtotal: 10,000
Direct Costs Total Cost
Inspector Vehicle - Vehicle Charge of $5/hr 1,305.00
Direct Costs Subtotal:
Total Cost: 81.760.00
Project Notes:
1. Project duration is based on 30 working days. Total Not-to-Exceed 81,760.00
2. Hours and cost listed on this fee sheet are an estimate only; actual hours and cost will be based on the schedule provided by the contrator.
Inspector hours are based on the contractor working 8 hours per day with minimal overtime. . Construction Managers hours are based on 3 hours per dav.
1. Nicht Work is considered a Nicht Shift and will be billed at $200/hr.
5. NO night Inspection assumed for an this project.
;. Inconctor ratee increase 3% per fiscal vear.