Text extracted from the city's file for reading and search. Open the original on cotaticity.primegov.com. That file is the official record.

1 | Page
   
117 Park Place
Richmond, CA 94801
510.236.7435 t
510.232.5325 f
i n t r e s . c o m
   
Main Point of Contact/
Principal /
Lead Architect:

Edward Anisman, AIA,

NCARB, LEED AP
510.236.7435, x152
[email protected]
   
April 22, 2025
Craig Scott
Director / City Engineer
City of Cotati: Public Works & Engineering
201 W Sierra Ave,
Cotati, CA 94931
Subject: City of Cotati – Roof Repair and Replacement Consultation Dear Mr. Scott:

We are pleased to submit our proposal for the roof repair and consultation projects for the Civic Center, Sunflower Park Restroom, and Ladybug Park Pump house Our firm has a demonstrated history of successfully delivering complex roofing projects across a diverse range of building types, including civic and infrastructure facilities. With extensive expertise in roofing systems, waterproofing, and remedial work, our team of experienced architects and engineers is committed to providing innovative, sustainable, and tailored roofing solutions that address the specific requirements of each project.

PART I – PROJECT DESCRIPTION AND SCOPE

0. General: Project Description and Program: All projects will generally include:
• Expedited Project Delivery: In order to assist the city in bidding the projects for construction in summer 2025, the deliverables will focus on input required to appropriately bid the projects.
• Separate Projects: Fees given for each of the three separate projects are stand-alone. Bid Documents developed for each of the three projects are also be stand-alone.
• Options and Additional Services: As a result of the base scope of work described below, additional options and/or recommendations may develop that go beyond the base of work. We will advise the city of these options – along with a fee proposal where appropriate – before proceeding.
• Information Provided by Client: We request that the city provide as-built drawings of Cotati Police Department and other buildings if available.

1. Cotati Police Department Roof (Civic Center)
203 W Sierra Ave, Cotati, CA 94931
The scope of work for the Police Department roof consists of a roof assessment focusing on potential skylight and/or skylight flashing deficiencies as well as other potential points of water penetration into the building.
2 | Page
The Cotati Police Department building is approximately 15-18 years old.

The steep composition shingle roof is reportedly the original roof. The warranty for the existing roof system is approximately 25-30 years (subject to confirmation with city records). The roof has virtually no penetrations other than the skylights and isolated vents. Attic space contains mechanical equipment and ducting. The suspended acoustical ceilings provide access to viewing the attic space above. Walls are gypsum wallboard.

Although the field of the roof appears to be in good condition and likely to have an additional 10+ years of service life, there have been continuous water penetration issues since the structure’s original construction, reportedly related to the poorly flashed skylight penetrations (two small skylights plus a single, long ridge skylight). Numerous repair attempts have not resolved the issue.

Interior damage from water entry includes wall and ceiling stains in the corridor and adjoining administration and exercise rooms. These locations are either 1) directly under the skylights or 2) reached from an unknown point of entry via structural members or ducting.

Specific tasks include – but are not limited to – the following:

Investigative Phase
• Roof Assessment and Investigation: This phase will include visual observations of the roof and destructive testing at the skylights as required to determine construction and assess potential sources of water penetration. (All destructive testing will be made watertight before leaving the site.)
• Findings: Prepare a brief report of findings, including recommendations for repair of deficiencies.

Note: As noted in Options and Additional Services, above, findings may include recommendations for work not included in this base scope of work that develop through the assessment and investigation phase. We will advise the city of these options – along with a fee proposal where appropriate – before proceeding. • Documentation: Prepare Bid Documents with specification sections and/or drawings as required to bid purposes.

Bid Phase
• Attend Bid Walk, respond to Requests for Information (RFIs); assist in in reviewing Bids.

Construction Phase
• In addition to reviewing submittals and responding to RFIs, attend preconstruction meeting, two (2) progress site visits, and a punch walk.

2. Sunflower Park Restroom Roof
East Cotati Ave at Sunflower Drive, Cotati, CA 94931
The primary scope of work for this building is to replace the roof and gutters that have exceeded their expected service life.
3 | Page
As this is a fairly straightforward project, our services will be limited as follows:
• Assessment and Recommendations: Visit the site and make specific recommendations regarding the type of roofing system to be specified, including both roofing materials and gutters.
• Bid Phase: Attend a bid walk in conjunction with Project 1Bid Walk.

Note: A separate bid walk will be considered an extra service. • Construction Phase: We will be available for consultation during construction.

3. Well 2 Roof
Accessed from Lakewood Ave and adjoining Ladybug Park
The primary scope of work for this building is to replace the roofs (both steep and low-slope area) and gutters that have exceeded their expected service life.

As this is a fairly straightforward project, our services will be limited as follows:
• Assessment and Recommendations: Visit the site and make specific recommendations regarding the type of roofing system to be specified, including both roofing materials and gutters.
• Bid Phase: Attend a bid walk in conjunction with Project 1Bid Walk.

Note: A separate bid walk will be considered an extra service. • Construction Phase: We will be available for consultation during construction.

PART II – PROJECT SCHEDULE

1. Project Schedule:
• Assessment and Consultation Phase: April/May 2025
• Bid Phase: May/June 2025
• Construction Phase: Summer 2025

PART III – FEE PROPOSAL

1. Compensation:
a. Base Fee: Compensation will be on a Lump Sum Basis in the amount of indicated below for the three separate projects. Invoices will be sent separately for each project on a monthly basis, in an amount based on work completed to date.

4 | Page
Fee Summary Table ($)

b. Reimbursable Expenses: Estimated reimbursable charges for this project are primarily anticipated to be travel to the site. Reimbursable expenses are in addition to hourly fees.

Reimbursable expenses also include such items as postage, reproduction, CAD drawing plotting, printing, special materials or equipment, storage of investigative samples or forensic evidence, and travel at the IRS standard mileage rate of $0.70 cents per mile.

Reprographics – half size (15”x21”) $1.60; Reprographics – full size (30”x42”) $3.19; CD $5.00.
c. Additional Services: Services provided beyond the stated scope will be billed hourly at the rates shown as per the Exhibit B – Standard Rage Schedule.

Execution:

A copy of this Proposal signed and returned to IR will constitute our engagement agreement.

Section 5536.22 and 6749 of the Business and Professions Code requires architects and engineers to use a written contract when providing professional services to a client. In order to be in compliance with the law, it is imperative that this agreement be executed prior to any services being provided.

By integrating this proposal into the master agreement as an amendment, the Client shall acknowledge IR’s proposed scope and conditions that apply to the scope of work and compensation. _____________________________________________________________________________________ Name: Andrew Butt, AIA Date
Title: Managing Principal

Item Project Fee DT Reimb Sutotal
1 Cotati Police Department
Roof - Investigation &
Repair (includes DT
Contractor)
21,500 4,612 350 26,462
2 Sunflower Park Restroom
Roof - Consultation
1,200 50 1,250
3 Well 2 Roof - Consultation 1,500 50 1,550
TOTAL 24,200 4,612 450 29,262
5 | Page

EXHIBITS
A. Subconsultant Proposal - Enterprise Roofing Service, Inc: Proposal for Destructive Testing dated Aprill 17, 2025.

A. Standard Rate Schedule
Delivery address: 2400 Bates Ave. Concord, CA 94520
P.O. Box 5130 Concord, CA 94524-0130
Phone (925) 689-8100 Fax (925) 825-5027
California License # 221274
Public Works Registration # 1000000444
Armando D. Garcia Estimator/Project Manager [email protected]

BUILT-UP ROOF PATCHING
All roof plywood deck removal.

EXCLUSIONS
All roof inspections.
make watertight repairs.

Destructive testing as required to determine existing construction causation of water penetration; make watertight repairs.

All bonds and permits.
$4,080
One (1) mobilization.
17-Apr BID PROPOSAL
Attn: Edward Anisman Interactive Resources 117 Park Place Richmond, CA 94801 The undersigned agrees to furnish and provide necessary labor, materials, tools, implements, and appliances to do, perform and complete in a good workmanlike manner the following.

JOB NAME AND ADDRESS: Cotati Police Department (Civic Center) 203 W Sierra Ave, Cotati, CA 94931 Respectfully submitted by ENTERPRISE ROOFING SERVICE, INC.

Armando D. Garcia

BASE BID TOTAL
Void this proposal after 30 days.

INSTALLED TAX INCLUDED PER PLANS AND SPECIFICATIONS
All lead and asbestos containing material.

All rough carpentry; all wood, all wood nailers, all blocking.

All temporary weather protection; all temporary/emergency roofing All sheet metal flashing and trim, all counter flashings, reglets, all vent pipe flashings, all valley metal, all cap at top of parapet, All copper flashing, all galvanized caps metal coping.

Assist in observations of the suspect skylight flashings A photo report with description that were performed will be provide.

All debris caused by our work will be removed from the job site on a daily basis. www.enterpriseroofing.com Page 1 of 1 Telephone # (925) 689-8100 117 Park Place, Point Richmond, CA 94801 | Tel: 510.236.7435 | Fax: 510.232.5325 | www.intres.com 1 Standard Rate Schedule
Exhibit A
Title Per Hour
President/Sr. Project Manager 263.00
Managing Principal/Sr. Project Manager 239.00
Associate Principal/Sr. Project Manager 227.00
Project Manager 215.00
Senior Structural Engineer 215.00
Historic Preservation Architect/Historian 196.00
Senior Project Designer/Drafter 189.00
Designer Drafter 153.00
Technical Support 146.00
Rates are subject to change as employees receive salary modifications. *Interactive Resources may opt to utilize contract employees for peak loads Last revision August 1, 2022 Exhibit B