Cities Index.
Draft FY26-27_Water Transmission Summary_20260122_TAC

Cotati City Council
March 10, 2026

Document
Draft FY26-27_Water Transmission Summary_20260122_TAC
Meeting
March 10, 2026
Body
Cotati City Council
Original file
1.5 MB
Text extracted from the city's file for reading and search. Open the original on cotaticity.primegov.com. That file is the official record.

Sonoma Water i Draft 2/11/2026
Water Transmission FY 2026/2027 Draft Budget and Rates
Sonoma Water Background
Sonoma Water is a wholesale water supplier to nine cities and water districts that serve more than 600,000 residents in portions of Sonoma and Marin counties. The Russian River provides most of Sonoma Water’s water supply with groundwater supply from the Santa Rosa Plain as a secondary source.

Under agreements with the U.S. Army Corps of Engineers, Sonoma Water manages the water supply storage in Lake Mendocino and Lake Sonoma to provide a reliable water supply and maintain minimum instream flow requirements for fish and wildlife protection and recreation in the Russian River and Dry Creek. Sonoma Water holds water-right permits issued by the State Water Resources Control Board that authorize Sonoma Water to store up to 122,500 acre-feet per year of water in Lake Mendocino and up to 245,000 acre-feet/year of water in Lake Sonoma.

The primary points of Sonoma Water’s diversion facilities near Forestville include six radial collector wells that extract Russian River underflow that has been filtered through approximately 100 feet of natural sand and gravel. This highly efficient, natural filtration process, with chlorination treatment, produces high-quality, potable water. This water is then fed directly into Sonoma Water's aqueduct system.

The Water Transmission System extends from Sonoma Water’s Russian River diversion facilities located near Forestville to the Santa Rosa, Petaluma, and Sonoma valleys. The Water Transmission System consists of over 85 miles of pipelines, seven booster-pump stations, and 18 storage tanks with a combined storage capacity of 128.8 million gallons. The major pipelines that comprise the system and range in diameter from 16 to 54 inches are:
the Santa Rosa Aqueduct (built in 1959), the Sonoma Aqueduct (built in 1963), the Petaluma Aqueduct (built in 1962), and the Cotati Intertie (built in 1977).

Sonoma Water remains dedicated to serving our communities and securing our future through responsible resource and environmental stewardship, continued technical innovation, investment in critical infrastructure and effective fiscal management.

Recent Highlights
A few highlights of programs and projects that Sonoma Water accomplishes in collaboration with the water contractors and other partners that benefit the community are summarized below. More information can be found on Sonoma Water’s website at: https://www.sonomawater.org. • Santa Rosa Plain Water Supply Resiliency: Reactivated three Santa Rosa Plain Wells, utilizing $6.9 million in Department of Water Resources grant funding for two of the wells, and implemented Aquifer Storage and Recovery for additional water supply reliability and alleviate drought impacts to the water contractors and their customers.
• Regional Water Supply Resiliency: Sonoma Water has worked collaboratively with the water contractors to improve the region’s water supply reliability during periods of water supply shortage due to drought, seismic, and other hazard events. Using Sonoma Water's transmission system as the backbone, Sonoma Water is pursuing development of a Regional Water Bank Implementation Strategy to integrate the most significant regional water storage facilities (Lake Sonoma, groundwater basins, Lake Stafford, and Marin Water reservoirs).

Sonoma Water ii Draft 2/11/2026
• Hazard Mitigation: Sonoma Water and its water contractors have invested substantially in efforts to protect water supply infrastructure with continued emphasis on implementing high priority seismic and flood hazard mitigation projects.
• Sonoma-Marin Saving Water Partnership (SMSWP): Sonoma Water is administering a $4 million regional drought resiliency program with a $2 million United States Bureau of Reclamation grant that is being passed through to the water contractors to implement critical drought resiliency programs. • Water, Stormwater, and Energy Education Program: Sonoma Water collaborates with the SMSWP and Sonoma Clean Power to bring its education program annually to more than 16,000 local students. • Dry Creek Habitat Enhancement: Sonoma Water, the water contractors, and the U.S. Army Corps have completed 5 miles of restoration to date. The U.S. Army Corps agreement with Sonoma Water provides a 65 percent cost share to complete fishery habitat restoration work in Dry Creek. • 2025 Russian River Biological Opinion: On April 29, 2025, the National Marine Fisheries Service (NMFS) issued a second Russian River Biological Opinion to the USACE, Sonoma Water, and the Mendocino County Russian River Flood Control and Water Conservation Improvement District. The 2025 Russian River Biological Opinion has a ten-year term and covers the USACE and Sonoma Water’s operations and maintenance activities, including water supply, flood control, channel maintenance and habitat restoration in the Russian River watershed.

Sonoma Water leverages partnerships to implement programs funded from other sources that also benefit the water contractors and the community they serve:
• Quagga Mussels: Sonoma Water collaborates with the U.S. Army Corps of Engineers, the California Department of Fish and Wildlife, and the California Department of Boating and Waterways on a boat inspection strategy to prevent invasive mussel infestations in Lake Mendocino and Lake Sonoma. • Forecast Informed Reservoir Operations (FIRO): FIRO is an ongoing collaborative program with Sonoma Water, the U.S. Army Corps of Engineers, and a multi-agency steering committee that began in 2012.

FIRO is a flexible water management approach that uses data from watershed monitoring and improved weather forecasting to help water managers selectively retain or release water from reservoirs for increased resilience to droughts and floods. A significant accomplishment in 2025 was the incorporation of FIRO into updates to the water control manual for Coyote Valley Dam and Lake Mendocino. The revised manual redefines the operating rules around flood control schedules for the first time in the dam’s 66-year history by incorporating the principles of modern-day forecast-informed reservoir operations, or FIRO, to enhance the facility’s dual mission of flood risk management and water supply security.
• San Francisco Bay Advanced Quantitative Precipitation Information System (AQPI): The AQPI system provides X-Band and C-Band weather radar information that will increase the accuracy of weather forecasting and response systems throughout the Bay Area. A $20 million grant from the Department of Water Resources awarded in 2016 to Sonoma Water and its partners to install four weather radars in the Bay Area to provide improved precipitation and hydrologic information to water agencies, flood control managers, and emergency personnel. The C-Band radar installation was accomplished in late 2025. The radar data will result in improved management of water supply reservoirs, and improved operations of wastewater systems and flood protection facilities.

Challenges
Sonoma Water, our water retailers, and the industry at-large are facing very similar challenges including aging infrastructure, rising operating and maintenance costs, and water usage fluctuations resulting in lower revenues.

These challenges drive rate increases which have a financial impact on end users but are necessary to upgrade infrastructure and ensure reliable service. Similar to the water contractors, Sonoma Water has deferred maintenance and capital projects to keep water rates as low as possible while providing clean, reliable, essential water for the benefit of the water contractors and the 600,000 customers they serve every day. These challenges Sonoma Water iii Draft 2/11/2026
will continue to put pressure on rates given the significant needs of the system in the coming years as additional infrastructure investments are required.

Aging Infrastructure
Our critical infrastructure, including aqueducts, pipelines, pump stations, storage tanks, and wells are gradually aging after decades of reliable service. A significant portion of these assets are approaching the end of their useful lifespan. Preliminary assessments of the water production/transmission systems indicate that a large portion is in less than acceptable (i.e. fair, poor, or failed) condition. The age of the infrastructure and current condition of assets, combined with substantial levels of deferred maintenance, present a significant challenge for Sonoma Water in the near term. The draft FY 2026/2027 Water Transmission Budget supports Sonoma Water’s five-year strategic plan by continuing investments to upgrade critical aging infrastructure and systems that supply essential water to all the water contractors and ultimately 600,000 residents in Sonoma and Marin County.

To address this challenge, Sonoma Water has developed an Asset Management Program and is also currently preparing a 20-year Comprehensive Water Master Plan on the water production/transmission system. The assessment data collected under the Asset Management Program will be incorporated, along with recommendations of other current seismic and regional resilience planning efforts, into the 20-year Comprehensive Water Master Plan. These efforts will provide crucial information on system health and we anticipate these efforts will identify additional system needs on both the near and long-term timeframes.

Rising operating and maintenance costs
Operation and maintenance costs continue to rise due to several factors including inflation, labor costs, and increasing regulations. Economic and operational pressures include significant increases in the price of electricity, chemicals, and treatment supplies. In addition, tariffs cost increases are starting to materialize and are creating additional uncertainty in regard to future costs.

Water Usage Fluctuations/Volumetric Rate
The terms of the Restructured Agreement for Water Supply require that budgeted deliveries be the lesser of the preceding twelve months of water delivered, or the average annual amount of water delivered during the preceding 36 months. This requirement is to ensure Sonoma Water can meet its obligation to set rates at an amount that covers the projected costs for the following year. Sonoma Water must also generate sufficient revenue to cover debt obligations and maintain a debt coverage ratio as stipulated in outstanding bond issuances.

Deliveries remain low by historical standards and trends show negative or flat growth both in the near and long term. Sonoma Water’s rate is fully volumetric meaning that lower deliveries drive rates higher. Year-to-year differences in budgeted deliveries averaged over the 3-, 5-, and 10-year periods have been negative, even when including the deviation proposed and approved in FY 2024/2025 to use the higher of the delivery numbers. Yearto-year differences in actual deliveries inherently have more variability but have also shown negative growth when averaged over 5-year period. The 3-year and 10-year periods show growth, but this is skewed by the fact that both FY2015/2016 and FY2022/2023 set records as our two lowest delivery years on record, meaning the 3- year and 10-year figures have abnormally low starting points.

Difference in Year-to-Year Budgeted
Deliveries
Difference in Year-to-Year Actual
Deliveries
3-year
average
5-year
average
10-year
average
3-year
average
5-year
average
10-year
average
-2.39% -0.49% -1.46% 5.50% -3.35% 1.14%
Sonoma Water iv Draft 2/11/2026
* Increase in actual deliveries in FY20-21 was partially due to the backfilling of Stafford Lake by NMWD. In FY21-22, MMWD took excess winter instream flows. FY22-23 was an historic low at 36,032 AF.

Multiple years of drought and mandated conservation measures resulted in low water deliveries, low water sales revenue, and reduced fund balance reserves. The FY budgeted deliveries of 41,776 AF represent a 1.49% decrease (631 AF) from the FY 2025/2026 budget.
35,000
40,000
45,000
50,000
55,000
60,000
65,000
70,000
Acre-Feet
Fiscal Year
Water Deliveries - Budget to Actual
Budget Actuals Linear (Actuals)
Sonoma Water v Draft 2/11/2026
Draft Proposed Budget
This draft FY 2026/2027 Water Transmission Budget has been developed based on the prior 12-month of water deliveries of 41,776 Acre-Feet (AF) and is shown below.

The proposed rate increases are 8.21% to 8.97% for prime contractors served from the three aqueducts. See page xi which includes more details and also includes rates for Town of Windsor, NMWD, and MMWD.

Sources of revenue including water sales and charges for services, federal and state grants, existing fund balances, contributions, interest, and bond financing are detailed below:

Revenues
FY 2026/2027
Draft Budget
Increase/(Decrease)
over FY 2025/2026
Water Sales & Charges for Services $65,423,715 7.28%
Power Sales 300,000 200.00%
Operating Grants 34,871 (52.23%)
Capital Grants 0 0%
Contributions 740,370 24.67%
Interest & Investment Earnings 1,394,278 27.75%
TOTAL $67,893,234 8.04%
*Capital Grant figure only reflects new awards. Most capital grants are multi-year projects and project revenues/expenses will be rolled forward into the adjusted budget. New awards not known at budget time will be added to the adjusted budget. *Contributions include TOW diverted revenue and WUE Passthroughs.

Fund Balance FY 2026/2027
Draft Budget
Increase/(Decrease)
over FY 2025/2026
Use of Fund Balance: $ 2,097,124 (73.56%)
Bond Funds FY 2026/2027
Draft Budget
Increase/(Decrease)
over FY 2025/2026
Use of Bond Funds $ 12,510,000 (5.33%)
FY25-26 FY26-27
Budget
(in Millions)
Budget
(in Millions)
Change
(in Millions)
Operations and Maintenance $45.87 $48.75 $2.88
Capital Projects $18.28 $10.90 ($7.38)
Biological Opinion Compliance, Water
Supply Planning, Water Conservation $8.80 $10.09 $1.29
Debt Service $9.07 $8.67 ($0.41)
Totals $82.02 $78.41 ($3.62)
Grants, Use of Fund Balance, and Bond
Proceeds $21.22 $14.64 ($6.58)
Sonoma Water vi Draft 2/11/2026
Budget Requirements:
• Maintain 3-month operating reserve.
• Maintain 1.15x debt coverage bond covenant.
• Rates collect 1.15x debt service in accordance with the provisions of the Water Transmission System Master Ordinance.

Changes made since January 22, 2026 Draft Water Transmission Budget:
• Increased Power Sales from $100,000 to $300,000 as we anticipate the Warm Springs Dam Hydo Project will be operational at end of Q3. In future years this amount will reflect Power Sales for the full 12 months.
• Added revenue of $300,000 in Common Facilities for the construction of the Warm Springs Dam Hydropower Retrofit Project. Revenue source is from Power and Water Resources Pooling Authority (PRWPA) P-3 funding.
• Fixed formula error in computation of O&M rate.
• These changes reduced rate increases:
o Santa Rosa Aqueduct/Town of Windsor reduced from 8.83% to 8.21% o Petaluma Aqueduct reduced from 9.58% to 8.97%
o Sonoma Aqueduct reduced from 9.28% to 8.72%
o North Marin Water District reduced from 10.01% to 9.42% o Marin Municipal Water District reduced from 8.23% to 7.68% • Various other typographical or sum errors not affecting the rate.

Factors affecting the Rate Increase:
• 1.49% decrease in deliveries
• Multiple years with actual water deliveries below budget reducing reserves. Total budget shortfall over prior three years is 7,888 AF.
• Erosion of fund balance available to offset rate increases. • Lack of budgeted grant funding.
• 4.41% decrease in overall budget from PY.
• 6.28% increase in O&M costs.
• 40.37% decrease in Capital Project costs (Capital program funded by loans, bonds, and fund balance) • 14.66% increase in Subfund costs.
• 4.52% decrease in debt service.
• 100% of the rate increase is attributable to the O&M and subfund (Water Management, Watershed Planning and Restoration, Recycled Water and Local Supply, and Water Conservation) budget the year. • Increases in material and equipment costs for aging infrastructure and priority maintenance projects that can no longer be deferred, supply chain disruptions, long lead times on equipment, and the current inflationary environment are putting continued upward pressure on the Water Transmission System budget.

Fund Highlights:

Operations and Maintenance (O&M)
Sonoma Water vii Draft 2/11/2026
• 7.3% increase in water sales revenue due to a decrease in deliveries and the rate needed to cover budgeted expenditures.
• 7.9% increase in budgeted expenditures. Budgeted expenditure increases are attributable to cost increases for maintenance equipment, permitting costs, SCADA system contributions, utilities, staff costs (tied to negotiated labor agreements), and the Tank Recoating Program. Note that the increase in FY26/27 request for the Tank Recoat Program is partially due to cuts to its budget in prior years that reduced our rate smoothing efforts.
• O&M budget has been already been reduced by $1.7 million, or 2.9%, by deferring maintenance costs, studies, and projects. Included in this amount is a $450,000 reduction to the Tank Recoat Program. This could result in a rate spike in future years as the project’s costs cannot be deferred indefinitely. • Deferring the maintenance projects above reduced the O&M rate increase from more than 12.32% to

8.21%.
• Budgeted projects have been thoroughly reviewed and edited and represent the budgeted work that can reasonably occur in FY 2026/2027. Budgeted maintenance projects are a priority, and further delays and cuts pose detrimental operational impact and risk.
• Must have sufficient net operating revenues to meet 1.15x debt coverage bond covenant requirement.

Note that an estimated $32.96M bond issuance is occurring in FY25/26. • Water Sales Revenue Budget to actuals:
o FY 2021/2022: -$1M
o FY2022/2023: -$10.2M
o FY 2023/2024: -$1.6M
o FY 2024/2025: $2.6M
o FY 2025/2026: -$0.7M (current estimate)
• FY 2025/2026 expenditures are anticipated to align with the adjusted budget. Unspent non-routine project budget is rolled forward to subsequent budget years to avoid being included in the rate calculation more than once.

See pages 18-25 for details on major services & supplies, maintenance – equipment, and consulting/contractual services occurring in FY26/27.

Capital Projects
Capital Projects: FY 2026/2027 draft budgeted expenditures of $10.90 million decreased by $7.38 million or 40%.

The capital program is fully funded by grants, bonds, and use of fund balance. See detailed list of capital projects on page xvii.

The Capital budget has been thoroughly reviewed and represents the budgeted work that can reasonably occur in FY 2026/2027 or will need to be encumbered in FY26/27 utilizing bond funds, capital charges, and fund balance.

Hazard mitigation projects ($3.55 million) and infrastructure improvement projects/drought resiliency projects ($7.36 million) are fully funded by Water Revenue Bonds, Grants, and Fund Balance.

Construction: Hazard Mitigation Projects $1,859,215
Bennett Valley Fault Crossing 50,220
River Diversion Structure (RDS) Upgrade Project 598,625 Seismic Retrofit of Storage Tanks – Ralphine 1 13,100
Seismic Retrofit of Storage Tanks – Sonoma 1 648,360
Sonoma Water viii Draft 2/11/2026
Wilfred Booster Station 548,910
Design: Hazard Mitigation Projects $1,686,640
Seismic Retrofit of Storage Tanks - Sonoma 2 480,600
Seismic Retrofit of Storage Tanks – Ralphine 2 453,100
Seismic Retrofit of Storage Tanks – Other Tanks 752,940 Construction: Other Capital Projects $178,054
Warm Springs Dam Hydropower Retrofit 178,054
Design Other Capital Projects $7,179,471
Kawana-Ralphine SBS Pipeline 267,136
Mirabel/Wohler Storage Building 4,600,995
Water Treatment System Modernization - Shone Farm & FBS 1,273,640 Water Treatment System Modernization - Wohler Facility 1,037,700 Watershed Planning/Restoration (Biological Opinion)
• 99.81% increase in revenue due to an increase in costs associated with the 2025 Russian River Biological Opinion and the rate needed to cover budgeted expenditures coupled with a decrease in available fund balance to offset rate increases.
• $2.4 million in Use of Fund Balance reduces rate increase from 234.43% to 108.74%. • 108.74% rate increase compared to 14.14% increase in FY 2025/2026 when $3.2 million in Use of Fund Balance was budgeted.
• Expenditures are anticipated to range from $3.5 million to $5.6 million annually in this subfund. A rate of $95.41/AF at 41,776 AF generates $3.99 million in revenue. This gets us to the lower end of the anticipated expenditure estimate. There is a need to increase revenue in this fund to cover a greater portion of annual costs as we continue to utilize fund balance to keep the rate low. If more fund balance were used, there would be a significant rate spike in subsequent years to generate sufficient revenue for the subfund. The rate increase is intended to smooth future rate increases. • See pages 27-28 for list of consulting/contractual services occurring in FY26/27.

Water Conservation
• 9.05% increase in revenue due to the rate needed to cover budgeted expenditures and lower anticipated grant revenue partially offset by increased revenue from Town of Windsor diverted water charges. • 6.92% increase in expenditures.
• $160,000 in Use of Fund Balance. Reduces rate increase from 19.00% to 13.00%. o FY 2025/2026 Adopted Budget used $210,000 in Fund Balance to reduce the Water Conservation Rate Increase to 7.20%.
o Without the Use of Fund Balance in the FY 2025/2026 Adopted budget, the Water Conservation rate increase would have been 15.51%.
• See pages 30-31 for list of consulting/contractual services occurring in FY26/27.

Similar to last year, the Water Conservation Subfund budget is only inclusive of what is needed to maintain existing successful regional programs of the Partnership, including the Water Education Program, Green Business Program, Garden Sense Program, Water Loss Working Group and Validation Services, QWEL Program, EcoFriendly Garden Tour, and WaterSmart Plant Label Program.

Sonoma Water ix Draft 2/11/2026
Water Management Planning
The Water Management Planning rate is decreasing from the previous year as FY2025/2026 budget included costs for the 2025 Urban Water Management Plan (UWMP). The next UWMP will be issued in 2030. Sonoma Water attempts to smooth the cost for this 5-year report to avoid rate spikes, but rate reduction efforts in prior years resulted in the removal of the smoothing efforts. The FY2026/2027 budget request includes costs to smooth the rate for the 2030 UWMP. Sonoma Water was able to use $50,000 in Fund Balance to help reduce the FY2026/2027 rate.
• See pages 26 for list of consulting/contractual services occurring in FY2026/2027.

Recycled Water and Local Supply
Recycled Water and Local Supply costs have historically been for Sonoma Water’s share of the groundwater sustainability agency’s contributions. Sonoma Water’s share of mandatory fees has been included in the Agency Operating fund since FY 2024/2025. The is sufficient fund balance to set the rate at $0.00/AF this year and still cover depreciation which is currently the only expense.

Debt Service
Debt Service Expenditures decrease by $.41M or 4.52% as a result of debt issuance costs for the planned $32.96M in 2026 Water Revenue Bonds being captured in the Prior Year Budget. A list of capital projects that we anticipate funding with revenue bond proceeds in the 3-year required time frame is shown in the Long-Range Financial Plan.

Summary
Sonoma Water, our water retailers, and the industry at-large are facing very similar challenges including aging infrastructure, rising operating and maintenance costs, and water usage fluctuations resulting in lower revenues, forcing many wholesalers and retailers to raise rates beyond historical averages to address maintenance and capital needs. These challenges drive rate increases which have a financial impact on end users but are necessary to upgrade infrastructure and ensure reliable service. Similar to the water contractors, Sonoma Water has deferred maintenance and capital projects to keep water rates as low as possible while providing clean, reliable, essential water for the benefit of the water contractors and the 600,000 customers they serve every day.

The proposed draft budget for FY 2026/2027 is based on accomplishing the required elements of the Biological Opinion, maintenance of facilities, continued implementation of hazard mitigation and reliability projects, and projects to maintain, replace, and improve critical infrastructure. The FY budgeted deliveries of 41,776 AF represent a 1.49% decrease (631 AF) from the FY 2025/2026 budget, and the combination of low reserves, increasing operations and maintenance costs to keep pace with critical system needs, and capital projects to replace aging infrastructure, has contributed to needed rate increases.

Sonoma Water recognizes the profound impact of natural hazards, the remnants of the COVID-19 pandemic, inflationary pressures, and other economic circumstances to many residents, businesses, and our retail water contractors. In response to the far-reaching financial hardships, Sonoma Water has made a conscious effort to propose reasonable rate increases while continuing to maintain system reliability and public health and safety.

The many challenges we face will continue to put pressure on rates given the significant needs of the system in the coming years as additional infrastructure investments are required.

Significant efforts have been made to propose a responsible budget. The proposed rate increases are 8.21% to

8.97% for prime contractors served from the three aqueducts. See page xi for more details on prime contractors’ rates and the rates for Town of Windsor, NMWD, and MMWD.

Sonoma Water x Draft 2/11/2026
Sonoma Water continues to have one of the lowest wholesale water rates in the San Francisco Bay Area. The chart below compares the proposed FY26/27 rate per AF on the SR AQ to the current rates of other wholesale water agencies in the Bay Area.
* Valley Water rates for FY26/27 are not available as of 1.22.26. FY25/26 rates are used as a placeholder. *Zone 7 and Contra Costa Adjust rates on a Calendar Year. 2026 Rates are listed $-
$200
$400
$600
$800
$1,000
$1,200
$1,400
$1,600
$1,800
$2,000
$2,200
$2,400
$2,600
$2,800
Sonoma
County Water
Agency
Zone 7 Water
Agency
Contra Costa
Water District
Valley Water San Francisco
Public Utilities
Commission
Sonoma Water xi Draft 2/11/2026
Proposed rates are shown in the table below:

Charge / Aqueduct Santa Rosa Petaluma Sonoma
Deliveries (Acre-Feet) 41,776
O&M $1,106.05 $1,106.05 $1,106.05
Water Management Planning $2.63 $2.63 $2.63
Watershed Planning & Restoration $95.41 $95.41 $95.41
Recycled Water and Local Supply $0.00 $0.00 $0.00
Water Conservation $72.13 $72.13 $72.13
Total O&M $1,276.22 $1,276.22 $1,276.22
Storage & Common Bond/Loan Charges $228.65 $228.65 $228.65 Petaluma Aqueduct Bond/Loan Charge $27.55
Sonoma Aqueduct Bond/Loan Charge $166.46
Prime Contractors $1,504.87 $1,532.42 $1,671.33
Discretionary Charges
Capital Charges - to build fund balance for
future projects
$11.00 $10.00 $34.90
Total Prime Contractors $1,515.87 $1,542.42 $1,706.23
Total Overall Increase: 8.21% 8.97% 8.72%
Entity Rate per AF Rate Increase
Town of Windsor $1,515.87 8.21%
Town of Windsor (Diverted Water) $170.18 48.94%
NMWD 1,611.15 9.42%
MMWD $1,886.15 7.68%
• Deliveries: (Budget Packet Pages 9-14):

FY 2023/2024
Budget
FY 2023/2024
Actuals
FY 2024/2025
Budget
FY 2024/2025
Actuals
FY 2025/2026
Budget
FY 2026/2027
Est. Budget
12-months 3-year average 3-year average 12-months
41,847 41,317 42,826 45,184 42,407 41,776

1.3% less than
budget

5.5% more
than budget
A/F Difference (530) 2,358
FY 2025/2026 Budgeted Deliveries vs FY 2026/2027
Budgeted Deliveries

1.5% decrease
FY 2024/2025 Actuals vs FY 2025/2026 Estimated Actuals 7.5% decrease Sonoma Water xii Draft 2/11/2026
• Operations and Maintenance (O&M) – Water Transmission O&M Fund (Budget Packet Pages 15-25):
o In accordance with the Restructured Agreement for Water Supply:
 The rate is calculated by dividing operations and maintenance expenditures (less specific cash and noncash revenues and expenditures) by budgeted deliveries.

O&M Fund
Increase
(Decrease)
in Dollars
Percent
Change Description
Rate per AF $76.89 7.47%
Increase is attributable to increased infrastructure maintenance needs including higher expenditures for Tank Recoat Program due to the partial removal of rate smoothing efforts in prior years.

Revenue $4,710,000 7.68% Increase in revenue is attributable to the rate increase, interest earnings, and anticipated power sales.

Expenditures $5,358,000 7.89%
Increase is attributable to cost increases for maintenance equipment, permitting costs, SCADA system contributions, utilities, staff labor costs tied to negotiated labor agreements, and other expenditures increases described below.

Factors affecting the O&M rate:

O&M Fund
Expenditures
Increase
(Decrease)
in Dollars
Percent
Change Description
Labor $1,074,000 5.06%
Increase is attributable to an increase in labor costs for maintenance projects. Most of this increase is due to negotiated labor rates.

Power $50,000 1.04% Power demand and costs expected to increase roughly 1% from prior year budget.

Chemicals $46,000 3.81% Costs expected to remain stable after several years of large increases.

Testing/Analysis $0 0.00%
Costs expected to align with FY2025/2026 budget. Budget includes sampling and analysis tied to the Santa Rosa Plain Wells Projects as well as microplastics and Perfluoroalkyl/Polyfluoroalkyl Substances (PFAS) testing.

Contract Services $1,979,000 20.68%
Increase primarily attributable to increased budget needs tied to the Tank Recoat Program, partially offset by deferral of tank recoat rate smoothing efforts and a decrease in costs for studies.

Maintenance -
Equipment $166,000 6.22%
Increase is attributable to a general increase in routine maintenance costs and fencing repairs at water tanks and booster stations.

Rents and Leases
- Heavy Eqt $0 0.00% Costs expected to align with FY2025/2026 budget/actuals.

Sonoma Water xiii Draft 2/11/2026
O&M Fund
Expenditures
Increase
(Decrease)
in Dollars
Percent
Change Description
Equipment
Usage Charges $0 0.00% Costs expected to align with FY2025/2026 budget/actuals.

SCADA $7,200 0.28% Increase attributable to water transmission system’s share of SCADA maintenance expenses and capital project costs.

Operating
Transfers $1,961,000 8.00%
Operating Transfers (OT’s) move revenue generated by rates into respective funds (debt service funds, subfunds, aqueduct capital funds and Common Facilities) and maintain an appropriate fund balance.
• Subfunds: (Budget Packet Pages 26-34):
o Subfund rates are calculated by dividing subfund expenditures minus grant revenue by budgeted water deliveries.
o Water Management Planning:
 Expenditures are for Urban Water Management Planning (UWMP) which is required to be updated every five years and the Annual Water Supply & Demand Assessment.

Water
Management
Planning
Increase
(Decrease)
in Dollars
Percent
Change Description
Rate per AF ($1.94) -42.4%
Fiscal Year 2025/2026 rate is $4.57. Fund is for Urban Water Management Plan updates and the Annual Water Supply &
Demand Assessment. Using $50,000 in fund balance. Rate
decrease is due to reduced needs due to 5-year cycle of Urban Water Management Plan partially offset by lower use of fund balance.

Revenue ($90,000) -42.8% Decrease due to subfund rate decrease and decreased interest earnings.

Expenditures ($190,000) -54.3%
Budget decrease is tied to reduced efforts for contract service and staff time related to the Urban Water Management Plan. The next UWMP will be issued in 2030. Sonoma Water attempts to smooth the cost for this 5-year report to avoid rate spikes.

Sonoma Water xiv Draft 2/11/2026
o Watershed Planning and Restoration:
 Expenditures are for planning, design, and implementation of watershed restoration projects and projects required under the Biological Opinion.

Watershed
Planning and
Restoration
Increase
(Decrease) in
Dollars
Percent
Change Description
Rate per AF $49.71 108.7%
Fiscal Year 2025/2026 rate is $45.71. Rate increase is primarily a result of costs associated with the new Biological Opinion, including Estuary Enhancement, Eel Grass & eDNA monitoring, Dry Creek small scale restoration, Hydrologic index work, CEQA petitions, and the upper river steelhead migration study and a decrease in the use of fund balance. Rate of $152.86/AF based on $6.4M in expenditures and 41,776 AF is reduced to $95.41/AF by using $2.4M in fund balance. In Fiscal Year 2025/2026, $3.2M in fund balance was utilized to offset rate increases.

Revenue $2,157,000 99.8%
Increase due to subfund rate increase partially offset by lower interest earnings and use of fund balance to reduce and smooth overall rate increase.

Expenditures $1,248,000 24.3%
Increase is primarily a result of costs associated with the new Biological Opinion, including Estuary Enhancement, Eel Grass & eDNA monitoring, Dry Creek small scale restoration, Hydrologic index work, CEQA petitions, and the upper river steelhead migration study and a decrease in the use of fund balance.

Sonoma Water xv Draft 2/11/2026
o Recycled Water and Local Supply:
 Expenditures are for planning, design, and implementation of recycled water and local supply projects. The fund previously included water contractor projects under the Local Recycled Water Tier 2 (LRT2) Program.

Recycled Water
and Local Supply
Increase
(Decrease)
in Dollars
Percent
Change Description
Rate per AF ($0.14) -100.0% Fiscal Year 2025/2026 rate is $0.14. Dropping to $0.00 by using Fund Balance.

Revenue $2,000 29.2% Using an estimated $6,000 in fund balance. Increase in revenue is associated with anticipated interest earnings.

Expenditures $0 0.0% The only budged expenditure is $6,000 in depreciation. No change from prior year.

Water Conservation:
 Expenditures are for water use efficiency projects, outreach, and education.

Water
Conservation
Increase
(Decrease)
in Dollars
Percent
Change Description
Rate per AF $8.30 13.0%
Fiscal Year 2025/2026 rate is $63.83. Rate of $77.49/AF based on $3.2M of net expenditures and 41,776 AF is reduced to $73.66/AF by using $160,000 in fund balance. In Fiscal Year 2025/2026, net expenditures were 2.9M and $210,000 in fund balance was utilized to offset rate increases.

Revenue $298,000 9.1%
Increase due to subfund rate increase to cover budgeted expenditures and lower anticipated grant funding than prior year budget, partially offset by increased revenue from Town of Windsor diverted water charges.

Expenditures $229,000 6.9%
Increase is primarily associated with negotiated labor rates and outreach programs. Expenditures are used to implement water use efficiency, outreach and education projects, and address ongoing water conservation needs.

Sonoma Water xvi Draft 2/11/2026
• Storage, Common, and Sonoma Bond/Loan Charges: (Budget Packet Pages 41-55):
o The rates are calculated by dividing the annual debt service and reserve requirements (2015A, 2019A, 2022A, and anticipated 2026A Water Revenue Bonds) by water deliveries.

Storage and
Common
Bond/Loan
Charges
Increase
(Decrease)
in Dollars
Percent
Change Description
Storage
Bond/Loan
Charge
($4.29) -8.6%
Fiscal Year 2025/2026 rate is $50.09. Rate is based on revenue requirement for debt service divided by water deliveries. Total Debt service lower than previous year as issuance costs tied to the 2026 Bonds for capital projects in the Storage Fund were paid in FY2025/2026. Decrease partially offset by a decrease in budgeted water deliveries.

Common
Bond/Loan
Charge
($13.51) -6.9%
Fiscal Year 2025/2026 rate is $196.36. Rate is based on revenue requirement for debt service divided by water deliveries. Total Debt service lower than previous year as issuance costs tied to the 2026 Bonds for capital projects in the Common Fund were paid in FY2025/2026. Decrease partially offset by a decrease in budgeted water deliveries.

Petaluma
Aqueduct
Bond/Loan
Charge
$11.89 75.9%
Fiscal Year 2025/2026 rate is $15.66. Petaluma Aqueduct pays an additional revenue bond charge for the bonds associated with Ely BPS Flood Control and Electrical Upgrade and Wilfred Booster Station Projects. Rate is based on revenue requirement for debt service divided by water deliveries.

Sonoma
Aqueduct
Bond/Loan
Charge
$21.91 15.2%
Fiscal Year 2025/2026 rate is $144.56. Sonoma Aqueduct pays an additional revenue bond charge for the bonds associated with Sonoma Booster Station Electrical Upgrade and Pumping Reliability Project, Bennett Valley Fault Crossing Project, and other Creek Crossing Projects on the Aqueduct. Rate is based on revenue requirement for debt service divided by water deliveries. Total Debt service higher than previous year due to structure of the bond payments on existing debt.

Aqueduct Capital Charge: (Budget Packet Page 1):
o A discretionary charge is added by the water contractors to build fund balance for future aqueduct capital projects and to provide rate stabilization capacity. o The FY 2025-2026 budget included an $11 per Acre-Foot charge for the Santa Rosa Aqueduct, a $10 per Acre-Foot charge for the Petaluma Aqueduct, and a $34.90 per Acre-Foot charge for the Sonoma Aqueduct.
o The FY 2026-2027 draft budget includes a $11 per Acre-Foot charge for the Santa Rosa Aqueduct, a $10 per Acre-Foot charge for the Petaluma Aqueduct, and a $34.90 per Acre-Foot charge for the Sonoma Aqueduct pending input from the water contractors
• Overall Draft Proposed Rate Increases: (Budget Packet Pages 1-8):
o 8.21% (Santa Rosa Aqueduct); 8.97% (Petaluma Aqueduct); 8.72 % (Sonoma Aqueduct) o FY2026/2027 budgeted deliveries are based on 12-month actual water deliveries (41,776 AF).

FY2026/2027 budgeted deliveries are 1.5% less than FY 2025/2026 budgeted deliveries.

Sonoma Water xvii Draft 2/11/2026
FY 2026-2027 Capital Projects (Budget Packet Pages 35-40):

Water Transmission Budget FY26-27
Capital Projects Summary
Project Category Amount Status
Wilfred Booster Station Petaluma AQ 548,910 Equipment prepurchase and fabrication underway; construction contract awarded Dec 2025.

Bennett Valley Fault Crossing
Sonoma AQ 50,220 90% design in progress; final design and construction on hold pending possible FEMA funding.

Kawana-Ralphine SBS Pipeline
Storage 267,136
Design agreement for Ph 1 (Ralphine to SBS) approved June 2025; multi-year design effort underway.

Seismic Retrofit of Storage Tanks-Sonoma 1 Storage 648,360 Design in progress; include with Sonoma 1 recoat project scheduled to advertise March 2026.

Seismic Retrofit of Storage Tanks-Sonoma 2 Storage 480,600 Finalizing geotech report; assessing seismic design needs for larger recoat project (design to begin Spring 2026).

Seismic Retrofit of Storage Tanks-Ralphine 1 Storage 13,100 Design in progress; include with Ralphine 1 recoat project scheduled to advertise Jan 2026.

Seismic Retrofit of Storage Tanks-Ralphine 2 Storage 453,100 Finalizing geotech report; assessing seismic design needs for larger recoat project (design to begin Spring 2026).

Seismic Retrofit of Storage Tanks Design - Other Tanks Storage 752,940 Comprehensive tank program geotech; seismic design for Eldridge 2 and Kawana 1 to commence FY26/27.

Wohler Road Storage Facility
Common 4,600,995
Public Draft CEQA March 2026 with Board adoption in June 2026; advertisement anticipated December 2026.

River Diversion Structure (RDS) Upgrade Project Common 598,625 Design at 99%; anticipated to advertise Feb 2026.

Warm Springs Dam Hydropower Retrofit Common 178,054 90% design; construction advertisement expected June 2026.

Water Treatment System Modernization - Shone Farm & FBS Common 1,273,640
ROW ongoing and geotech completed; 50% design submitted in Dec 2025 with advertise target of Dec 2026.

Water Treatment System Modernization - Wohler Facility Common 1,037,700 Design agreement to be executed in FY26/27.

TOTAL 10,903,380
Santa Rosa AQ -
Petaluma AQ 548,910
Sonoma AQ 50,220
Storage 2,615,236
Common 7,689,014
10,903,380
Budget Packet Page
Rates
Prime Contractor Rates Summary 1-2
Water Charges Per Acre-Foot 3
Revenue Summary 4
Water Rates 5
O&M Rate 6
Line Item Rate Comparison 7
Russian River Projects and Conservation Charges 8
Deliveries
Deliveries (36 Mo) 9
Deliveries (12 Mo) 10
Deliveries and Revenue - All Aqueducts 11
Deliveries and Revenue - Santa Rosa Aqueduct 12
Deliveries and Revenue - Petaluma Aqueduct 13
Deliveries and Revenue - Sonoma Aqueduct 14
Agency O&M Fund
Agency Fund Cash Summary 15-17
Major Services and Supplies Expenditure Items 18
Equipment Maintenance, Contracts, Consulting Services 19-20 Contract Services & Contributions Project Information 21-25 Subfunds
Water Management Subfund 26
Watershed Planning and Restoration Subfund 27-28
Recycled Water and Local Supply Subfund 29
Water Conservation Subfund 30-31
Subfund Contract Services 32-34
Facilities and Other Funds
Santa Rosa Aqueduct Capital Fund 35
Petaluma Aqueduct Capital Fund 36
Sonoma Aqueduct Capital Fund 37
Storage Facilities Cash Summary 38
Common Facilities Cash Summary 39
North Marin Water Deposit Fund 40
Bonds and Loans
State Revolving Loan Debt Service Fund 41
State Revolving Loan Reserve Fund 42
Storage Bonds 2015 Cash Summary 43
Common Bonds 2015 Cash Summary 44
Sonoma Bonds 2015 Cash Summary 45
Common Bonds 2019 Cash Summary 46
Sonoma Bonds 2019 Cash Summary 47
Storage Bonds 2022 Cash Summary 48
Common Bonds 2022 Cash Summary 49
Sonoma Bonds 2022 Cash Summary 50
Petaluma Bonds 2026 Cash Summary 51
Storage Bonds 2026 Cash Summary 52
Common Bonds 2026 Cash Summary 53
Bond & Loan Charges 54-55
Fund Balances and Operating Transfers 56
Sonoma County Water Agency
Fiscal Year 2026/2027 Draft Water Transmission Budget and Rates Fiscal Year 2026/2027 Prime Contractor Rates Summary
Santa Rosa Petaluma Sonoma
Aqueduct Aqueduct Aqueduct FY25-26
Percent
Change
SR Pet Son
O&M Charge [4.2] $1,106.05 $1,106.05 $1,106.05 $1,029.16 $1,029.16 $1,029.16 7.47% Water Management Planning Sub-charge [4.13] 2.63 2.63 2.63 $4.57 $4.57 $4.57 -42.44% Watershed Planning/Restoration Sub-charge [4.14] 95.41 95.41 95.41 $45.71 $45.71 $45.71 108.74% Recycled Water & Local Supply Sub-charge [4.15] 0.00 0.00 0.00 $0.14 $0.14 $0.14 -100.00% Water Conservation Sub-charge [4.16] 72.13 72.13 72.13 $63.83 $63.83 $63.83 13.00% O&M Charge $1,276.22 $1,276.22 $1,276.22 $1,143.42 $1,143.42 $1,143.42 11.61% Storage and Common Bond & Loan Charges 228.65 228.65 228.65 $246.45 $246.45 $246.45 -7.22% Petaluma Aqueduct Bond Charge 27.55 $15.66 75.92%
Sonoma Aqueduct Bond Charge 166.46 $144.56 15.16%
PRIME CONTRACTORS $1,504.87 $1,532.42 $1,671.33 $1,389.86 $1,405.52 $1,534.42 8.27% Capital Charges - to build fund balance
for future projects 11.00 10.00 34.90 $11.00 $10.00 $34.90 0.00% PRIME CONTRACTORS 11.00 10.00 34.90 $11.00 $10.00 $34.90 0.00% TOTAL PRIME CONTRACTORS $1,515.87 $1,542.42 $1,706.23 $1,400.86 $1,415.52 $1,569.32 8.21% Increase from Fiscal Year 2025/2026 8.21% 8.97% 8.72% 8.68% 10.76% 7.60% With No Capital Charge 7.42% 8.26% 6.50%
Deliveries:
12-month 36-month
FY16-17 40,524
FY17-18 41,446
FY18-19 41,768
FY19-20 43,870
FY20-21 43,707
FY21-22 46,095
FY22-23 45,748
FY23-24 41,847
FY24-25 42,826
FY25-26 42,407
FY26-27 41,776
CHARGE PER ACRE FOOT:
2/11/2026
1 Fiscal Year 2026/2027 Prime Contractor Rates Summary
CHARGE PER ACRE FOOT:

Petaluma AQ

NMWD NMWD
Percent
Change
FY26-27 FY25-26
O&M Charge [4.2] $1,106.05 $1,029.16 7.47%
Water Management Planning Sub-charge [4.13] 2.63 4.57 -42.44% Watershed Planning/Restoration Sub-charge [4.14] 95.41 45.71 108.74% Recycled Water & Local Supply Sub-charge [4.15] 0.00 0.14 -100.00% Water Conservation Sub-charge [4.16] 72.13 $63.83 13.00% O&M Charge $1,276.22 $1,143.42 11.61%
North Marin Bond & Loan Charge [4.9] 160.87 148.66 8.22% Russian River Conservation Charge [4.18 (a)] 154.06 160.41 -3.96% Russian River Projects Charge [4.18 (b)] 20.00 20.00 0.00% TOTAL NMWD $1,611.15 $1,472.48 9.42%
Rates Rate Increase
Town of Windsor 1,515.87 8.21%
Town of Windsor (Diverted Water) 170.18 48.94%
NMWD 1,611.15 9.42%
MMWD 1,886.15 7.68%
2/11/2026
2 SANTA
ROSA

AQUEDUCT
% INCR.
(DECR.)

PETALUMA

AQUEDUCT
% INCR.
(DECR.)
SONOMA

AQUEDUCT
% INCR.
(DECR.)
2026 - 2027 1515.87 8.21% 1542.42 8.97% 1706.23 8.72%
2025 - 2026 1400.86 8.68% 1415.52 10.76% 1569.32 7.60%
2024 - 2025 1289.02 9.88% 1278.02 9.98% 1458.41 8.14%
2023 - 2024 1173.09 10.56% 1162.09 9.42% 1348.67 10.56% 2022 - 2023 1061.04 6.05% 1062.04 6.15% 1219.90 6.52%
2021 - 2022 1000.46 3.47% 1000.46 3.47% 1145.18 3.43%
2020 - 2021 966.95 5.30% 966.95 5.30% 1107.21 5.57%
2019 - 2020 918.30 4.60% 918.30 4.60% 1048.80 4.77%
2018 - 2019 877.88 3.67% 877.88 3.67% 1001.06 5.98%
2017 - 2018 846.78 4.98% 846.78 4.98% 944.56 5.58%
2016 - 2017 806.59 5.98% 806.59 5.98% 894.62 6.94%
2015 - 2016 761.05 4.16% 761.05 4.16% 836.55 5.46%
2014 - 2015 730.68 3.60% 730.68 3.60% 793.24 3.19%
2013 - 2014 705.30 4.95% 705.30 4.95% 768.75 3.84%
2012 - 2013 672.03 5.98% 672.03 5.98% 740.34 5.26%
2011 - 2012 634.11 5.00% 634.11 5.00% 703.33 4.28%
2010 - 2011 603.92 6.93% 603.92 6.93% 674.47 8.42%
2009 - 2010 564.78 19.88% 564.78 10.50% 622.11 27.95%
2008 - 2009 471.13 6.66% 511.13 10.71% 486.22 7.22%
2007 - 2008 441.70 2.41% 461.70 2.31% 453.49 2.46%

WATER TRANSMISSION SYSTEM
FY26-27 WATER CHARGES PER ACRE-FOOT

FOR PRIME CONTRACTORS
FISCAL
YEAR
A-2 2/11/2026
3 FY26-27 FY25-26 FY26-27
WATER CUSTOMER Budgeted Water
Use (Acre-Feet)
Rate
$/Acre-Foot
Proposed Rate
$/Acre-Foot Dollar Change Percent Change
Santa Rosa Aqueduct 16,027 $1,400.86 $1,515.87 $115.01 8.21% Petaluma Aqueduct 10,125 1,415.52 1,542.42 126.90 8.97% Sonoma Aqueduct 3,090 1,569.32 1,706.23 136.92 8.72%
North Marin Water District 4,708 1,472.48 1,611.15 138.67 9.42% Marin Municipal – Fourth
Off Peak 4,300 1,751.63 1,886.15 134.51 7.68%
Marin Municipal –
Supplemental 1,694 1,751.63 1,886.15 134.51 7.68%
Forestville Aqueduct 351 1,400.86 1,515.87 115.01 8.21% Wholesale/Municipal 902 1,883.18 2,047.48 164.30 8.72%
Surplus 59 1,372.09 1,531.46 159.37 11.62%
Windsor 521 1,400.86 1,515.87 115.01 8.21%
TOTAL 41,776

WATER TRANSMISSION SYSTEM
FY26-27 REVENUE SUMMARY CHART
2/11/2026
4 [x] ESTIMATED [ ] OFFICIAL CHARGE PER ACRE FOOT:

Santa Rosa Petaluma Sonoma
Aqueduct Aqueduct Aqueduct

PRIME CONTRACTORS
O&M Charge [4.2] $1,106.05 $1,106.05 $1,106.05
Water Management Planning Sub-charge [4.13] $2.63 $2.63 $2.63 Watershed Planning/Restoration Sub-charge [4.14] $95.41 $95.41 $95.41 Recycled Water & Local Supply Sub-charge [4.15] $0.00 $0.00 $0.00 Water Conservation Sub-charge [4.16] $72.13 $72.13 $72.13 O&M Charge $1,276.22 $1,276.22 $1,276.22
Bond & Loan Charges - to pay for existing debt service
Storage Facilities Capital Charge [4.7] 45.80 45.80 45.80 Common Facilities Capital Charge [4.8] 182.85 182.85 182.85 Petaluma Aqueduct Facilities Capital Charges [4.6 b] 27.55 Sonoma Aqueduct Facilities Capital Charges [4.6 b] 166.46 Total Bond & Loan Charges 228.65 $256.20 $395.11
Discretionary:

Aqueduct Capital Charges - to build fund balance for future projects Aqueduct Facilities Capital Charges [4.6 e] 11.00 10.00 34.90 LRT2 - included in Recycled Water & Local Supply Sub-Charge above.

TOTAL PRIME CONTRACTORS $1,515.87 $1,542.42 $1,706.23
Charge without LRT2 and voluntary AQ Capital Charge $1,504.87 $1,532.42 $1,671.33

OTHER AGENCY CUSTOMERS/WHOLESALE CHARGES
(WATER CO’S & PUBLIC AGENCIES)
O&M Charge $1,276.22 $1,276.22 $1,276.22
Capital Charges 228.65 256.20 395.11
Aqueduct Facilities Capital Charge [4.12] $542.61 $515.06 $376.15 TOTAL OTHER AGENCY CUSTOMERS/WHOLESALE CHARGES (4.12) $2,047.48 $2,047.48 $2,047.48 (120% OF HIGHEST PRIME)

FORESTVILLE
O&M Charge [4.2] * $1,106.05
Water Management Planning Sub-charge [4.13] $2.63
Watershed Planning/Restoration Sub-charge [4.14] $95.41 Recycled Water & Local Supply Sub-charge [4.15] $0.00
Water Conservation Sub-charge [4.16] $72.13
O&M Charge $1,276.22
Bond & Loan Charges - to pay for existing debt service
Aqueduct Facilities Capital Charges [4.6] 11.00
Storage Facilities Capital Charge [4.7] 45.80
Common Facilities Capital Charge [4.8] 182.85
Total Capital Charges 239.65
TOTAL FORESTVILLE $1,515.87
* Forestville Water District was exempt from Santa Rosa Aqueduct sub-charge from FY 06/07 to FY 16/17 [4.12].

NORTH MARIN WATER DISTRICT
O&M Charge $1,276.22 Note: N. Marin pays
North Marin Bond & Loan Charge [4.9] 160.87 bond and loan charge Russian River Conservation Charge [4.18 (a)] 154.06 in lieu of Capital Charge.

Russian River Projects Charge [4.18 (b)] 20.00
TOTAL NORTH MARIN WATER DISTRICT 1,611.15

FOURTH OFF-PEAK (MARIN MUNICIPAL)
Highest Prime on SR and PET AQ x 1.11 $1,712.09
Russian River Conservation Charge 154.06
Russian River Projects Charge 20.00
TOTAL FOURTH OFF-PEAK $1,886.15

SUPPLEMENTAL (MARIN MUNICIPAL)
Highest Prime on SR and PET AQ x 1.11 $1,712.09
Russian River Conservation Charge 154.06
Russian River Projects Charge 20.00
TOTAL SUPPLEMENTAL $1,886.15

SURPLUS
Non-Municipal / Municipal [4.11 (a)] $1,531.46 $1,531.46 $1,531.46 (120% of O&M Charge)
Town of Windsor $1,515.87
$1,515.87
The applicable section of the Restructured Agreement has been indicated in brackets.

Beginning in FY22/23 all water delivered to Town of Windsor is charged at the Santa Rosa Aqueduct rate [4.17 (a)]. Town of Windsor pays all subcharges [4.13, 4.14, 4.15, and 4.16] on all water they divert from the Russian River using their equipment [4.17 (b)].

SONOMA COUNTY WATER AGENCY RATES FOR WATER DELIVERIES IN FY26-27 5 FY 2026-27 BUDGET

SONOMA COUNTY WATER AGENCY
Operations and Maintenance Rate Computation

O & M REVENUE REQUIREMENT
ESTIMATED FISCAL YEAR EXPENDITURES $73,265,104
LESS:

Depreciation Amortization 8,082,000
Investment Income, Interest on Pooled Cash, Charges for Services 487,888 Power Sales 300,000
PWRPA Pre-paid Expense - FY 08/09 Rate Reduction-One time only "Mandatory Prudent Reserve" charge
Use of Fund Balance
Recycled Water funds taken from special reserve 0
Transfers Out 16,432,179
REVENUE REQUIREMENT (Net Expenditures) $47,963,037

O & M ACRE FOOT BASE
DELIVERIES: 41,776.4
LESS:

Marin Municipal 5,993.6
Surplus (Irrigation) 59.4
TOTAL BASE DELIVERIES 35,723.5
O & M RATE COMPUTATION:

Rate = Revenue Requirement - Marin Municipal Deliveries x 1.11 x 0.92568 x (Highest Prime Rate on Petaluma or Santa Rosa Aqueduct - Subfunds Rate)
Total Deliveries - Surplus Deliveries - Marin Muni Deliveries = 47,963,037 - (4,300.00 + 1,693.56) x 1409.99
41,776.4 - 59.4 - 5,993.6
* = 1,106.05
FY26-27
2/11/2026
6 FY25-26 FY26-27
(Actual) (Proposed) % Change
O&M Charge 1029.16 1106.05 7.47%
Water Management Planning Sub-Charge 4.57 2.63 -42.4%
Watershed Planning/Restoration Sub-Charge 45.71 95.41 108.74% Recycled Water Sub-Charge 0.14 0.00 -100.0%
Water Conservation Sub-Charge 63.83 72.13 13.00%
Total O&M Charge 1143.42 1276.23 11.62%
Santa Rosa Aqueduct Rate
O&M Charge 1143.41 1276.22 11.62%
Aqueduct Facilities Capital Charges [4.6 e] 11.00 11.00 0.0% Storage Facilities Capital Charge [4.7] 50.09 45.80 -8.56% Common Facilities Capital Charge [4.8] 196.36 182.85 -6.88% TOTAL 1400.86 1515.87 8.21%
Petaluma Aqueduct Rate
O&M Charge 1143.41 1276.22 11.62%
Aqueduct Facilities Capital Charges [4.6 e] 10.00 10.00 0.0% Storage Facilities Capital Charge [4.7] 50.09 45.80 -8.56% Common Facilities Capital Charge [4.8] 196.36 182.85 -6.88% Petaluma Aqueduct Facilities Capital Charges [4.6 b] 15.66 27.55 75.92% TOTAL 1415.52 1542.42 8.97%
Sonoma Aqueduct Rate
O&M Charge 1143.41 1276.22 11.62%
Aqueduct Facilities Capital Charges [4.6 e] 34.90 34.90 0.0% Storage Facilities Capital Charge [4.7] 50.09 45.80 -8.56% Common Facilities Capital Charge [4.8] 196.36 182.85 -6.88% Sonoma Aqueduct Facilities Capital Charges [4.6 b] 144.56 166.46 15.16% TOTAL 1569.32 1706.24 8.73%
FY26-27
Proposed Water Rates
2/11/2026
7 SONOMA COUNTY WATER AGENCY

RUSSIAN RIVER CONSERVATION CHARGE COMPUTATION
FISCAL YEAR 2026-27
PROPERTY ASSESSMENT VALUES AS OF FY25-26:

TAX CODE ENTITY SECURED UNSECURED TOTAL VALUE
14000 Forestville Co Water District 598,943,439 3,803,881 602,747,320 42800 City of Cotati 1,524,197,657 35,044,711 1,559,242,368 43500 City of Petaluma 13,911,178,062 532,053,317 14,443,231,379 43800 City of Rohnert Park 7,899,916,149 168,879,757 8,068,795,906 44500 City of Santa Rosa 33,561,545,162 1,083,896,031 34,645,441,193 45000 City of Sonoma 3,905,912,134 104,128,722 4,010,040,856 N/A Valley of the Moon Water District 4,965,119,994 22,802,157 4,987,922,151 TOTAL $66,366,812,597 $1,950,608,576 $68,317,421,173
Notes:
1 Total value of secured and unsecured property in service areas of Prime Water Contractors of Sonoma County (see above) $68,317,421,173 2 2016-17 Sonoma County tax rate per $100 of full cash value assessed for payment of Warm Springs Dam Project Obligations 0.007 3 Total tax levied on citizens residing in service areas of Prime Water Contractors of Sonoma County, i.e., (Line 1/100) x Line 2 $4,782,219
4 Total acre feet of water delivered to Prime Water Contractors of Sonoma County (excluding North Marin and Town of Windsor) plus deliveries to Forestville 31,041.00 during the prior 12 month period ending March 31.
5 Total Russian River Conservation Charge per Acre Foot (Line 3 / Line 4) $154.06 Russian River Projects Charge RR Conservation Charge
Historical calculations Historical calculations
For FY Calculated Actual Charge
06-07 17.02 $17.02 $48.33
07-08 21.4 $20.00 $52.70
08-09 25.08 $20.00 $58.44
09-10 24.68 $20.00 $57.70
10-11 24.4 $20.00 $74.62
11-12 23.44 $20.00 $72.27
12-13 20.38 $20.00 $72.08
13-14 14.72 $14.72 $63.30
14-15 8.72 $8.72 $63.90
15-16 12.39 $12.39 $69.38
16-17 12.96 $12.96 $78.73
17-18 13.08 $13.08 $105.78
18-19 9.13 $9.13 $109.75
19-20 8.34 $8.34 $102.09
20-21 8.68 $8.68 $106.12
21-22 10.63 $10.63 $115.94
22-23 13.92 $13.92 $115.36
23-24 15.79 $15.79 $137.33
24-25 20.37 $20.00 $159.28
25-26 26.85 $20.00 $160.41
26-27 30.21 $20.00 $154.06
2/11/2026
8 DELIVERING AQUEDUCT Monthly
Santa Rosa Petaluma Forestville Sonoma Total
36 Jan-23 1111.4 1374.6 24.5 240.3 2,750.7
35 Feb-23 976.6 1058.4 18.4 171.8 2,225.2
34 Mar-23 1055.7 946.1 19.2 147.2 2,168.1
33 Apr-23 872.7 665.8 20.7 166.8 1,726.0
32 May-23 1388.0 1896.0 30.3 328.2 3,642.6
31 Jun-23 1413.1 2301.5 31.4 348.8 4,094.8
30 Jul-23 1853.3 2813.1 42.0 456.0 5,164.4
29 Aug-23 1832.4 2669.5 42.4 452.9 4,997.1
28 Sep-23 1552.3 2229.6 34.3 427.0 4,243.2
27 Oct-23 1600.8 2423.0 33.1 410.8 4,467.7
26 Nov-23 1201.5 1505.0 25.3 225.0 2,956.7
25 Dec-23 1039.9 1196.3 19.2 152.3 2,407.7
24 Jan-24 1173.5 1254.9 22.6 212.5 2,663.4
23 Feb-24 1024.7 975.2 18.9 127.5 2,146.4
22 Mar-24 980.2 936.0 17.6 110.9 2,044.8
21 Apr-24 1091.5 1320.5 24.3 177.1 2,613.3
20 May-24 1395.6 1587.3 28.8 315.9 3,327.6
19 Jun-24 1613.2 2179.8 37.4 454.2 4,284.6
18 Jul-24 2216.4 3252.1 52.3 574.4 6,095.3
17 Aug-24 1855.3 2751.7 41.3 400.2 5,048.5
16 Sep-24 1964.3 2830.7 45.1 427.5 5,267.6
15 Oct-24 1685.8 2692.0 38.3 411.4 4,827.5
14 Nov-24 1033.3 1769.2 21.6 290.7 3,114.7
13 Dec-24 1168.1 1623.6 22.9 281.7 3,096.4
12 Jan-25 1112.0 1142.8 20.5 237.2 2,512.5
11 Feb-25 928.7 910.8 19.2 174.3 2,033.0
10 Mar-25 1014.2 897.8 19.1 157.2 2,088.2
9 Apr-25 1259.8 1324.7 24.9 225.4 2,834.8
8 May-25 1465.2 1662.9 29.2 271.4 3,428.7
7 Jun-25 1842.5 2626.5 40.0 328.1 4,837.1
6 Jul-25 1887.6 2630.9 42.7 400.7 4,961.9
5 Aug-25 1785.6 2443.0 40.0 363.2 4,631.8
4 Sep-25 1902.9 2835.3 44.0 335.9 5,118.0
3 Oct-25 1258.3 1941.8 27.3 223.5 3,450.9
2 Nov-25 876.5 1522.5 20.1 158.2 2,577.3
1 Dec-25 1273.4 1789.8 24.3 214.9 3,302.4
Total Deliveries 49,706.0 65,980.6 1,063.4 10,401.1 127,151.1 3-Year Annual Average 16,568.7 21,993.5 354.5 3,467.0 42,383.7 Past 12 Months 16,606.5 21,728.8 351.3 3,089.9 41,776.4 Total Deliveries 49,706.0 65,980.6 1,063.4 10,401.1 127,151.1 Less: North Marin 15,475.6 15,475.6
Marin Municipal 18,659.5 18,659.5
Sonoma Co. Deliveries 49,706.0 31,845.5 1,063.4 10,401.1 93,016.1 3-Year Annual Average 16,568.7 10,615.2 354.5 3,467.0 31,005.4

SCHEDULE OF WATER DELIVERIES BY AQUEDUCT
PAST 36 MONTHS / 12 MONTHS AVERAGE
2/11/2026
9 SONOMA COUNTY WATER AGENCY SONOMA COUNTY WATER AGENCY SCHEDULE OF ACTUAL PRIOR 12 MONTHS WATER DELIVERIES IN ACRE FEET (BY CUSTOMER TYPE) ACTUAL WATER DELIVERY DISTRIBUTION BY AQUEDUCT (ACRE FEET) JANUARY THROUGH DECEMBER PRIOR 12 MONTHS
Aqueduct * * * * DELIVERING AQUEDUCT * * * *
No. Jan-25 Feb-25 Mar-25 Apr-25 May-25 Jun-25 Jul-25 Aug-25 Sep-25 Oct-25 Nov-25 Dec-25 TOTAL Santa Rosa Petaluma Sonoma TOTAL PRIMES DELIVERED TO:
1 City of Santa Rosa 1,063.2 885.0 964.8 1,192.5 1,402.4 1,756.2 1,798.9 1,688.3 1,817.9 1,198.8 839.1 1,238.8 15,846.0 2 City of Petaluma 453.8 397.4 415.2 575.3 719.3 840.6 807.9 751.4 838.3 597.9 493.4 532.1 7,422.6 CITY OF SANTA ROSA (A) 2 North Marin Water Dist. 413.1 287.5 244.9 400.7 330.6 509.5 474.5 457.2 537.3 328.0 283.6 441.0 4,707.9 Jan 2025 966.8 0.0 96.5 1,063.2 2 City of Rohnert Park 189.4 158.7 170.5 269.0 237.3 264.3 266.6 264.9 323.1 221.9 204.4 344.3 2,914.4 Feb 2025 799.6 0.0 85.4 885.0 2 City of Cotati 29.5 30.3 30.1 42.2 49.0 63.7 62.7 59.9 56.9 34.5 21.5 29.3 509.7 Mar 2025 816.5 0.0 148.3 964.8 1 Town of Windsor 32.6 38.7 48.0 63.9 36.1 36.7 49.2 57.5 50.2 42.8 32.2 32.6 520.5 Apr 2025 960.5 0.0 232.0 1,192.5 4 City of Sonoma 97.3 85.9 89.8 141.9 183.5 226.3 224.8 212.0 205.0 120.3 81.5 116.0 1,784.4 May 2025 1,107.3 0.0 295.2 1,402.4 4 Valley of the Moon Dist. 131.1 80.7 60.0 72.1 64.9 82.7 154.1 132.5 107.4 89.6 62.0 79.0 1,116.0 Jun 2025 1,377.1 0.0 379.1 1,756.2 TOTAL PRIMES 2,410.0 1,964.2 2,023.3 2,757.7 3,023.1 3,780.0 3,838.8 3,623.8 3,935.9 2,633.6 2,017.7 2,813.3 34,821.4 Jul 2025 1,405.5 0.0 393.5 1,798.9 Aug 2025 1,319.1 0.0 369.1 1,688.3
OTHER AGENCY CUSTOMERS Sep 2025 1,433.7 0.0 384.1 1,817.9 1 Cal-American Water 15.2 4.1 0.6 2.2 25.4 46.3 34.4 34.5 31.2 13.2 4.3 0.9 212.4 Oct 2025 939.1 0.0 259.7 1,198.8 2 Penngrove Water Co 11.0 9.3 9.5 12.9 16.7 21.6 21.8 19.5 21.0 13.9 10.1 13.3 180.7 Nov 2025 671.6 0.0 167.5 839.1 4 Lawndale Mutual 1.8 1.4 1.7 3.0 4.5 6.2 8.2 6.1 7.5 3.7 2.1 1.8 47.9 Dec 2025 1,024.1 0.0 214.7 1,238.8 4 Kenwood Village Water Co 0.6 0.5 0.6 0.7 0.6 0.7 0.7 0.7 0.8 0.8 0.6 0.8 8.1 TOTAL SANTA ROSA 12,820.9 0.0 3,025.1 15,846.0 3 Forestville Co Water Dist. 20.5 19.2 19.1 24.9 29.2 40.0 42.7 40.0 44.0 27.3 20.1 24.3 351.3 1 Other Gov-Santa Rosa Aq 0.8 0.7 0.8 0.9 0.9 1.0 1.0 0.9 1.1 0.9 0.8 1.1 11.0 OTHER PRIME CONTRACTORS (B) 2 Other Gov-Petaluma Aq 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 CITY OF PETALUMA 0.0 7,422.6 7,422.6 4 Other Gov-Sonoma Aq 4.9 4.4 3.8 4.9 6.1 7.1 7.5 7.8 10.3 7.7 10.8 15.4 90.7 NORTH MARIN WATER DISTRICT 4,707.9 4,707.9 TOTAL OTHER AGY. CUST 54.7 39.7 36.0 49.6 83.5 122.9 116.3 109.5 115.9 67.6 48.8 57.5 902.1 CITY OF ROHNERT PARK 95.3 2,819.1 2,914.4 CITY OF COTATI 4.7 504.9 509.7
OFF-PEAK CUSTOMERS TOWN OF WINDSOR 520.5 520.5
2 Marin Municipal 46.0 27.6 27.6 24.6 310.0 926.8 997.4 890.0 1,058.8 745.7 509.4 429.6 5,993.5 CITY OF SONOMA 1,784.4 1,784.4 VALLEY OF THE MOON DISTRICT 1,116.0 1,116.0
SURPLUS CUSTOMERS TOTAL OTHER PRIME CONTRACTORS 620.6 15,454.5 2,900.3 18,975.4 1 Irrigation-Santa Rosa Aq 0.2 0.1 0.0 0.2 0.3 2.2 4.0 4.3 2.5 2.5 0.1 0.0 16.6 2 Irrigation-Petaluma Aq 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 TOTAL DELIVERIES TO PRIMES 13,441.5 15,454.5 5,925.4 34,821.4 4 Irrigation-Sonoma Aq 1.6 1.3 1.3 2.8 11.8 5.1 5.4 4.2 4.8 1.4 1.2 1.9 42.8 TOTAL SURPLUS CUST. 1.7 1.5 1.3 3.0 12.1 7.3 9.4 8.5 7.3 4.0 1.3 1.9 59.4 LESS: NORTH MARIN (4,707.9) (4,707.9) TOTAL DELIVERIES 2,512.5 2,033.0 2,088.2 2,834.8 3,428.7 4,837.1 4,961.9 4,631.8 5,118.0 3,450.9 2,577.3 3,302.4 41,776.4 TOTAL SONOMA COUNTY DELIVERIES 13,441.5 10,746.6 5,925.4 30,113.5 2/11/2026
10 FY 2026-27 BUDGET
Water Transmission System Agency Fund
ESTIMATED WATER DELIVERIES AND WATER SALES - O&M plus Surcharges

ESTIMATED

REVENUE CATEGORY ACRE FEET ESTIMATED ESTIMATED

DELIVERED RATES REVENUE

WATER SALES - O&M
1 PRIMES without Subcharges 34,821.4 1,106.05 38,514,360 2 OTHER AGENCY CUSTOMERS 902.1 1,877.30 1,693,485
3 MARIN MUNICIPAL (OFF-PEAK) 4,300.0 1,409.99 6,062,945 4 MARIN MUNICIPAL (SUPPLEMENTAL) 1,693.6 1,409.99 2,387,904 5 SURPLUS CUSTOMERS 59.4 1,361.29 80,842
TOTAL WATER SALES - O&M 41,776.4 N/A $48,739,536
Note: MMWD rate adjusted per Amended MMWD Water Supply Agreements Effective 7/1/15.

ESTIMATED

REVENUE CATEGORY ACRE FEET ESTIMATED ESTIMATED

DELIVERED RATES REVENUE
WATER SALES - Sub-charges
1a Water Management Planning Sub-charge [4.13] 41,776.4 2.63 110,000 1b Watershed Planning/Restoration Sub-charge [4.14] 41,776.4 95.41 3,986,054 1c Recycled Water & Local Supply Sub-charge [4.15] 41,776.4 0.00 0 1d Water Conservation Sub-charge [4.16] 41,776.4 72.13 3,013,329 TOTAL WATER SALES - Subcharges 41,776.4 N/A $7,109,383
2/11/2026
11 FY 2026-27 BUDGET
Water Transmission System Agency Fund
SANTA ROSA AQUEDUCT ESTIMATED WATER DELIVERIES AND WATER SALES - O&M plus Surcharges

ESTIMATED

REVENUE CATEGORY ACRE FEET ESTIMATED ESTIMATED

DELIVERED RATES REVENUE

WATER SALES - O&M
1 SANTA ROSA AQUEDUCT 16,606.5 1,106.05 18,367,672

ESTIMATED

REVENUE CATEGORY ACRE FEET ESTIMATED ESTIMATED

DELIVERED RATES REVENUE
WATER SALES - Sub-charges
1a Water Management Planning Sub-charge [4.13] 16,606.5 2.63 43,726 1b Watershed Planning/Restoration Sub-charge [4.14] 16,606.5 95.41 1,584,490 1c Recycled Water & Local Supply Sub-charge [4.15] 16,606.5 0.00 0 1d Water Conservation Sub-charge [4.16] 16,606.5 72.13 1,197,824 TOTAL WATER SALES - Subcharges 16,606.5 N/A $2,826,040

ESTIMATED

REVENUE CATEGORY ACRE FEET ESTIMATED ESTIMATED

DELIVERED RATES REVENUE

CAPITAL CHARGES
Aqueduct Facilities Capital Charges [4.6 e] 16,606.5 11.00 182,671

BOND AND LOAN CAPITAL CHARGES
Storage Facilities Capital Charge [4.7] 16,606.5 45.80 760,639 Common Facilities Capital Charge [4.8] 16,606.5 182.85 3,036,489 Petaluma Aqueduct Facilities Capital Charges [4.6 b] 16,606.5 0.00 0 Sonoma Aqueduct Facilities Capital Charges [4.6 b] 16,606.5 0.00 0 TOTAL WATER SALES - Capital & Bond and Loan Charges 16,606.5 N/A $3,979,799 TOTAL ESTIMATED REVENUE $25,173,511
2/11/2026
12 FY 2026-27 BUDGET
Water Transmission System Agency Fund
PETALUMA AQUEDUCT ESTIMATED WATER DELIVERIES AND WATER SALES - O&M plus Surcharges

ESTIMATED

REVENUE CATEGORY ACRE FEET ESTIMATED ESTIMATED

DELIVERED RATES REVENUE

WATER SALES - O&M
1 PETALUMA AQUEDUCT 21,728.8 1,106.05 24,033,177

ESTIMATED

REVENUE CATEGORY ACRE FEET ESTIMATED ESTIMATED

DELIVERED RATES REVENUE
WATER SALES - Sub-charges
1a Water Management Planning Sub-charge [4.13] 21,728.8 2.63 57,213 1b Watershed Planning/Restoration Sub-charge [4.14] 21,728.8 95.41 2,073,226 1c Recycled Water & Local Supply Sub-charge [4.15] 21,728.8 0.00 0 1d Water Conservation Sub-charge [4.16] 21,728.8 72.13 1,567,292 TOTAL WATER SALES - Subcharges 21,728.8 N/A $3,697,731

ESTIMATED

REVENUE CATEGORY ACRE FEET ESTIMATED ESTIMATED

DELIVERED RATES REVENUE

CAPITAL CHARGES
Aqueduct Facilities Capital Charges [4.6 e] 21,728.8 10.00 217,288

BOND AND LOAN CAPITAL CHARGES
Storage Facilities Capital Charge [4.7] 21,728.8 45.80 995,258 Common Facilities Capital Charge [4.8] 21,728.8 182.85 3,973,094 Petaluma Aqueduct Facilities Capital Charges [4.6 b] 21,728.8 27.55 598,603 Sonoma Aqueduct Facilities Capital Charges [4.6 b] 21,728.8 0.00 0 TOTAL WATER SALES - Capital & Bond and Loan Charges 21,728.8 N/A $5,784,243 TOTAL ESTIMATED REVENUE $33,515,151
2/11/2026
13 FY 2026-27 BUDGET
Water Transmission System Agency Fund
SONOMA AQUEDUCT ESTIMATED WATER DELIVERIES AND WATER SALES - O&M plus Surcharges

ESTIMATED

REVENUE CATEGORY ACRE FEET ESTIMATED ESTIMATED

DELIVERED RATES REVENUE

WATER SALES - O&M
1 SONOMA AQUEDUCT 3,089.9 1,106.05 3,417,558

ESTIMATED

REVENUE CATEGORY ACRE FEET ESTIMATED ESTIMATED

DELIVERED RATES REVENUE
WATER SALES - Sub-charges
1a Water Management Planning Sub-charge [4.13] 3,089.9 2.63 8,136 1b Watershed Planning/Restoration Sub-charge [4.14] 3,089.9 95.41 294,816 1c Recycled Water & Local Supply Sub-charge [4.15] 3,089.9 0.00 0 1d Water Conservation Sub-charge [4.16] 3,089.9 72.13 222,872 TOTAL WATER SALES - Subcharges 3,089.9 N/A $525,824

ESTIMATED

REVENUE CATEGORY ACRE FEET ESTIMATED ESTIMATED

DELIVERED RATES REVENUE

CAPITAL CHARGES
Aqueduct Facilities Capital Charges [4.6 e] 3,089.9 34.90 107,836

BOND AND LOAN CAPITAL CHARGES
Storage Facilities Capital Charge [4.7] 3,089.9 45.80 141,527 Common Facilities Capital Charge [4.8] 3,089.9 182.85 564,981 Petaluma Aqueduct Facilities Capital Charges [4.6 b] 3,089.9 0.00 0 Sonoma Aqueduct Facilities Capital Charges [4.6 b] 3,089.9 166.46 514,353 TOTAL WATER SALES - Capital & Bond and Loan Charges 3,089.9 N/A $1,328,697 TOTAL ESTIMATED REVENUE $5,272,079
2/11/2026
14 FY 2026-27 BUDGET

BEGINNING AND ENDING CASH SUMMARY
Section Title: Water Transmission System Agency Fund
Fund/Department No: 44205 33040100
Actual Estimated Adopted Requested Percent
Account Title 2024-2025 2025-2026 2025-2026 2026-27 Difference Change BEGINNNG FUND BALANCE 14,640,956 19,452,576 10,270,981

REVENUES

USE OF MONEY / PROPERTY
44002 Interest on Pooled Cash 1,268,101 211,651 211,651 337,888 126,237 59.64% 44101 Rent - Real Estate 0 0 0 24,975 24,975 N/A
SUBTOTAL 1,268,101 211,651 211,651 362,863 151,212 71.44%

INTERGOVERNMENTAL REVENUES
SUBTOTAL 0 0 0 0 0 N/A

CHARGES FOR SERVICES
45223 Sewer/Water Hook up Fees 50,976 20,000 20,000 20,000 0 0.00% 45301 Charges for Services 176,835 0 0 150,000 150,000 N/A 45314 Sale - Power 0 100,000 100,000 300,000 200,000 200.00% 45315 Sale - Water, Wholesale 47,018,729 46,494,686 46,494,686 48,739,536 2,244,850 4.83% 45316 Water Conservation 2,757,548 2,706,900 2,706,900 3,013,329 306,429 11.32% 45323 Common Fac Rev Bond Chg 4,315,820 5,907,651 5,907,651 5,671,346 (236,304) (4.00%) 45324 Storage Fac Rev Bond Chg 1,035,047 1,507,069 1,507,069 1,420,631 (86,439) (5.74%) 45325 Sonoma Aqueduct Rev Bond Chg 542,469 515,315 515,315 514,353 (962) (0.19%) 45326 Petaluma Aqueduct Rev Bond Chg 0 346,697 346,697 303,790 (42,907) (12.38%) 45327 Santa Rosa Aqueduct Cap Chg 351,710 309,921 309,921 323,068 13,147 4.24% 45328 Petaluma Aqueduct Cap Chg 87,788 121,766 121,766 217,288 95,522 78.45% 45329 Sonoma Aqueduct Cap Chg 172,447 118,191 118,191 114,950 (3,241) (2.74%) 45330 North Marin Rev Bond Chg 421,433 796,359 796,359 757,370 (38,989) (4.90%) 45331 Water Mgmt Plan/Restore Chg 16,232 194,000 194,000 110,000 (84,000) (43.30%) 45332 Watershed Plan/Restore Chg 1,854,107 1,938,370 1,938,370 3,986,054 2,047,684 105.64% 45333 Recycled Water & Local Supply 0 6,000 6,000 0 (6,000) (100.00%) SUBTOTAL 58,801,140 61,082,924 61,082,924 65,641,715 4,558,791 7.46%

MISCELLANEOUS REVENUES
46027 Insurance Claims Reimbursement 138,834 0 0 0 0 N/A 46040 Miscellaneous Revenue 4,897 0 0 0 0 N/A
46050 Cancelled/Stale Dated Warrants 2,500 0 0 0 0 N/A
46200 Revenue Appl PY Misc Revenue 8,315 0 0 0 0 N/A
SUBTOTAL 154,546 0 0 0 0 N/A

OTHER FINANCING SOURCES
47002 Sale of Capital Assets 0 0 0 0 0 N/A
47101 Transfers In - within a Fund 0 0 0 0 0 N/A
47102 Transfers In - btw Govtl Funds 0 0 0 0 0 N/A
SUBTOTAL 0 0 0 0 0 0
TOTAL REVENUES 60,223,788 61,294,575 61,294,575 66,004,577 4,710,003 7.68% 2/11/2026
15 Section Title: Water Transmission System Agency Fund Fund/Department No: 44205 33040100
Actual Estimated Adopted Requested Percent
Account Title 2024-2025 2025-2026 2025-2026 2026-27 Difference Change

EXPENDITURES

SERVICES AND SUPPLIES
51032 Janitorial Services 15,879 7,683 7,400 7,600 200 2.70% 51042 Insurance - Premiums 0 4,000 4,000 2,000 (2,000) (50.00%) 51061 Maintenance - Equipment 1,554,608 2,664,400 2,664,400 2,830,000 165,600 6.22% 51205 Advertising/Marketing Svc 875 5,000 5,000 3,000 (2,000) (40.00%) 51209 Information Tech Svc (non ISD) 2,471 4,500 4,500 2,000 (2,500) (55.56%) 51211 Legal Services 41,793 50,000 50,000 50,000 0 0.00% 51212 Outside Counsel - Legal Advice 0 2,500 2,500 2,500 0 0.00% 51221 Medical/Laboratory Services 0 10,000 10,000 10,000 0 0.00% 51229 Hazardous Waste Disposal Svc 736 0 0 0 0 N/A
51230 Security Services 0 2,000 2,000 2,000 0 0.00%
51231 Testing/Analysis 183,335 250,000 250,000 250,000 0 0.00% 51241 Outside Printing and Binding 2,592 2,000 2,000 2,000 0 0.00% 51242 Bank Charges 0 50 50 50 0 0.00%
51243 Filing Fees 100 0 0 0 0 N/A
51244 Permits/License/Fees 153,844 109,686 95,510 167,061 71,551 74.91% 51401 Rents and Leases - Equipment 176,207 400,000 400,000 400,000 0 0.00% 51402 Rents and Leases - Heavy Eqt 321,020 575,000 575,000 575,000 0 0.00% 51421 Rents and Leases - Bldg/Land 0 3,991 3,991 3,991 0 0.00% 51509 SCADA System Contributions 999,935 3,737,114 2,545,700 2,552,900 7,200 0.28% 51601 Training Services 25,641 15,000 15,000 25,000 10,000 66.67% 51602 Business Travel/Mileage 155 6,000 6,000 6,000 0 0.00% 51605 Private Car Expense 1,797 750 750 1,000 250 33.33% 51803 Other Contract Services 7,197,367 17,310,002 9,569,421 11,548,805 1,979,384 20.68% 51902 Telecommunication Usage 31,765 75,000 75,000 75,000 0 0.00% 51911 Mail Services 95 150 150 150 0 0.00%
51917 District Operations Chgs 23,380,829 22,210,231 21,229,384 22,303,591 1,074,207 5.06% 51921 Equipment Usage Charges 1,262,792 1,205,000 1,205,000 1,205,000 0 0.00% 52021 Clothing, Uniforms, Personal 13,973 8,000 8,000 8,000 0 0.00% 52031 Food 782 500 500 500 0 0.00%
52042 Janitorial Supplies 2,576 0 0 0 0 N/A
52043 Safety Supplies/Equipment 26,495 6,000 6,000 15,000 9,000 150.00% 52061 Fuel/Gas/Oil 42,056 75,000 75,000 75,000 0 0.00%
52063 Vehicle Parts 0 500 500 500 0 0.00%
52071 Materials and Supplies Expense 170,423 63,276 63,276 63,276 0 0.00% 52072 Chemicals 1,165,253 1,199,329 1,199,329 1,245,051 45,722 3.81% 52081 Medical/Laboratory Supplies 14,217 15,000 15,000 25,000 10,000 66.67% 52091 Memberships/Certifications 46,073 53,175 53,175 56,400 3,225 6.06% 52101 Other Supplies 0 0 0 80,000 80,000 N/A
52111 Office Supplies 9,560 7,500 7,500 7,500 0 0.00%
52112 Office Furniture/Fixtures 0 3,500 3,500 1,000 (2,500) (71.43%) 52114 Freight/Postage 86 1,000 1,000 1,000 0 0.00%
52115 Books/Media/Subscriptions 249 500 500 500 0 0.00% 52117 Mail and Postage Supplies 3,442 5,000 5,000 5,000 0 0.00% 52141 Minor Equipment/Small Tools 171,199 200,000 200,000 200,000 0 0.00% 52142 Computer Equipment/Accessories 188 2,500 2,500 2,500 0 0.00% 52143 Computer Software/Licensing Fees 45,033 52,633 52,633 54,050 1,417 2.69% 52191 Utilities 4,163 3,500 3,500 3,500 0 0.00%
52192 Utilities - Gas/Propane 314 0 0 0 0 N/A
52193 Utilities - Electric 4,314,228 4,802,500 4,802,500 4,852,500 50,000 1.04% SUBTOTAL 41,384,146 55,149,470 45,222,169 48,720,925 3,498,756 7.74%

OTHER CHARGES
53401 Amortization Expense 3,433 83,000 83,000 54,000 (29,000) (34.94%) 53402 Depreciation Expense 7,179,572 7,486,000 7,486,000 8,028,000 542,000 7.24% SUBTOTAL 7,183,005 7,569,000 7,569,000 8,082,000 513,000 6.78% 2/11/2026
16 Section Title: Water Transmission System Agency Fund Fund/Department No: 44205 33040100
Actual Estimated Adopted Requested Percent
Account Title 2024-2025 2025-2026 2025-2026 2026-27 Difference Change

FIXED ASSETS
19840 Work in Progress - Eqt 12,269 0 0 0 0 N/A
19841 Work in Progress - Intang 246,179 855,953 645,570 30,000 (615,570) (95.35%) SUBTOTAL 258,449 855,953 645,570 30,000 (615,570) (95.35%)

OTHER FINANCING USES
57011 Transfers Out - within a Fund 11,066,297 14,470,747 14,470,747 16,432,179 1,961,432 13.55% 57012 Transfers Out - btw Govtl Fund 0 0 0 0 0 N/A
SUBTOTAL 11,066,297 14,470,747 14,470,747 16,432,179 1,961,432 13.55% TOTAL EXPENDITURES 59,891,897 78,045,170 67,907,486 73,265,104 5,357,618 7.89% Adjustments to Reserves/Encumbrances:

Depreciation 7,183,005 7,569,000 8,082,000
Outstanding Encumbrances - Net Change (2,262,025) 0
Change in Prepaid Expense (13,843)
Change in Inventories (418,051)
Post audit adjustments (9,356)
ENDING FUND BALANCE 19,452,576 10,270,981 11,092,455
Operations and Maintenance 44205 Fund Balance Reserve Goal 12,187,731 Over/(Under) Goal (1,095,276)
2/11/2026
17 Water Transmission System Agency Fund
Major Services & Supplies Expenditure Items
Fund/Department No: 44205 33040100
Actual Adopted Requested Percent
FY24-25 FY25-26 FY26-27 Difference Change
51061 Maintenance - Equipment 1,554,608 2,664,400 2,830,000 165,600 6.22% 51211 Legal Services 41,793 50,000 50,000 0 0.00%
51231 Testing/Analysis 183,335 250,000 250,000 0 0.00%
51402 Rents and Leases - Heavy Eqt 321,020 575,000 575,000 0 0.00% 51509 SCADA System Contributions 999,935 2,545,700 2,552,900 7,200 0.28% 51803 Other Contract Services 7,197,367 9,569,421 11,548,805 1,979,384 20.68% 51917 District Operations Chgs 23,380,829 21,229,384 22,303,591 1,074,207 5.06% 51921 Equipment Usage Charges 1,262,792 1,205,000 1,205,000 0 0.00% 52072 Chemicals 1,165,253 1,199,329 1,245,051 45,722 3.81% 52193 Utilities - Electric 4,314,228 4,802,500 4,852,500 50,000 1.04% Power demand and costs expected to increase roughly 1% from prior year budget.

Reflects five year average expenditures.

Reflects five year average expenditures.

Increase is attributable to a general increase in routine maintenance costs and fencing repairs at water tanks and booster stations.

Increase primarily attributable to increased budget needs tied to the Tank Recoat Program, partially offset by deferral of tank recoat rate smoothing efforts and a decrease in costs for studies.

Increase attributable to water transmission system’s share of SCADA maintenance expenses and capital project costs.

Costs expected to align with FY2025/2026 budget. Budget includes sampling and analysis tied to the Santa Rosa Plain Wells Projects as well as microplastics and Perfluoroalkyl/Polyfluoroalkyl Substances (PFAS) testing.

Increase is attributable to an increase in labor costs for maintenance projects. The majority of this increase is due to negotiated labor rates.

Costs expected to remain stable after several years of large increases.

Costs expected to align with FY2025/2026 budget/actuals. 2/11/2026
18 AMOUNT
O&M Routine Maintenance
1 Routine Maintenance Equipment - Electrical/Instrumentation 300,000 2 Routine Maintenance Equipment - Plains Wells 100,000
3 Routine Maintenance Equipment - Production and Treatment 300,000 4 Routine Maintenance Equipment - SCADA 50,000
5 Routine Maintenance Equipment - Transmission and Storage 550,000 6 Routine Maintenance Equipment - Warm Springs Dam 5,000 7 Routine Maintenance Equipment - Water Operations 100,000 O&M Projects -
8 Collector Well 2 - Pump 4 Replacement 850,000
9 Water Tank and Booster Station Fencing Repairs 200,000 Emergency Management Program
10 Water System Emergency Inventory Program 300,000
Other
11 Santa Rosa Plain Well Monitoring Program 10,000
12 Santa Rosa Plain Wells Operational Support and Planning 50,000 13 Wohler Mirabel Groundwater Monitoring 15,000
$ 2,830,000
AMOUNT
1 SCADA System Contributions 2,552,900
$ 2,552,900
2026-27
Water Transmission System Agency Fund
51061 Maintenance - Equipment
51509 SCADA System Contributions
2/11/2026
19 AMOUNT
O&M Routine Maintenance
1 Routine Contract Services - Production and Treatment 288,500 2 Routine Contract Services - Transmission and Storage 300,000 3 Routine Contract Services - Water Education Facility 36,000 Implementation
4 Asset Management Program 150,000
5 Cathodic Protection - Maintenance 50,000
6 Cathodic Protection - Site Assessment and Design Support 50,000 7 Financial Services Agreements 30,000
8 Hazardous Materials Management 50,000
9 Lease Agreements 40,000
10 Regional Park Maintenance Facility (offsetting revenue) 150,000 11 Regional Water Supply Resiliency Implementation 50,000 12 Riverfront Park Maintenance - Regional Parks 150,000 13 Tank Maintenance Program 340,348
14 Tank Rehabilitation - Annadel No. 1 181,125
15 Tank Rehabilitation - Cotati No. 2 181,125
16 Tank Rehabilitation - Eldridge No. 2 181,125
17 Tank Rehabilitation - Kawana Spring No. 1 181,125
18 Tank Rehabilitation - Ralphine No. 2 3,567,592
19 Tank Rehabilitation - Sonoma No. 2 3,678,015
20 TPW Pavement Preservation Program 40,000
21 Warm Springs Dam Hydropower FERC Relicensing 100,000 Advocacy
22 Community Outreach Program 20,000
23 Government Affairs - Legislative Program 160,000
Integrated Water Management Plan
24 IRWM North Coast 50,000
Studies/Planning
25 As-Needed Planning Studies 100,000
26 DeMuth Property Hydrogeologic Investigation 150,000
27 Natural Hazard Reliability Study 100,000
28 Stream Gage Consultant Services 10,000
29 Transmission System Condition Assessments 411,350
30 Upstreamtech Hydroforecast 80,000
31 Water System Comprehensive Plan 210,000
32 Watershed Water Quality Study - LBNL 260,000
33 Watershed Water Quality Study - USGS 187,500
34 Wohler/Mirabel Groundwater Model Update and Supporting Stud 15,000 $ 11,548,805
51803 Other Contract Services
2/11/2026
20 51803 Other Contract Services & 51509 SCADA System Contributions Project Information FY26-27
Asset Management Program 150,000
Sonoma Water’s Asset Management Program (AMP) aims to enhance efficient asset management throughout its lifespan, promote data sharing and connectivity, and highlight responsible fiscal practices. In Phase 1, Sonoma Water reviewed existing asset management methods, established a clear vision and guiding principles, and developed a practical framework. Phase 2 focused on evaluating the condition of key facilities, including water production sites (Mirabel & Wohler), storage tanks, booster stations, and wastewater treatment plants. Sonoma Water also successfully launched the new Computerized Maintenance Management System (CMMS). Progress in Phase 3 has been somewhat slower due to the CMMS integration process. During this time, staff reviewed the Aqueduct Asset Management Strategy and Inspection plan; worked on flood control initiatives; began reviewing flood control conduits; and continued discussions on implementing AMP.

Looking ahead to FY 26/27, efforts will continue with CMMS integration and the full deployment of the AMP, which may include hiring new staff or engaging a consultant to help initiate the program; start assessing storm drain conduits, and commence the evaluation of the aqueducts, if feasible.

Regional Park Maintenance Facility (offsetting revenue) 150,000 This is part of the Wohler Road Storage Facility under Capital Projects. This project element is funded separately to track reimbursement from Regional Parks as Sonoma Water and Regional Parks are currently working together to develop a joint California Environmental Quality Act {CEQA) document for the Sonoma County Water Agency Wohler Storage Facility and Sonoma County Regional Park's Maintenance Facility and Park Residence Project {Project) on the former DeMuth property at 9841 Wohler Road near Forestville, CA. Sonoma Water is leading preliminary design, environmental studies, and development of a joint CEQA document for the Project and will invoice Parks for half of temporarily assigned staff time incurred on the Project for preliminary design, environmental studies, and development of a joint CEQA document. The net cost os zero as Regionla Parks will be reimbrusing full costs for their portion of the work.

In FY24/25, a funding agreement with Regional Parks was established. Design for the overall project commenced after Board approval of a consultant agreement in July 2024 and was advanced to a 60% design stage. Design was put on hold to await CEQA advancement.

In FY25/26, CEQA continued to advance. A draft CEQA document is planned for concurrent review with Regional Parks and Counsel in late January with a target draft to be released for public review in March 2026. CEQA adoption by the Board is currently scheduled for June 2026. Design is also scheduled to continue advancing through the end of FY25/26. We are currently awiating confirmation from regulatory agencies that no regulatory permits will be required for the project.

In FY26/27, any necessary regulatory permits (if needed) will be obtained. Final design will also be reached wtih a target advertise date of December 2026. Award of the construction contract and Notice to Proceed is also anticipated in late FY26/27.
2/11/2026
21 51803 Other Contract Services & 51509 SCADA System Contributions Project Information FY26-27
Regional Water Supply Resiliency Implementation 50,000
Retail water providers to over 600,000 people in Sonoma and Marin Counties are regionally connected through existing water supply infrastructure. Along with purchasing wholesale water from the Sonoma County Water Agency, each retail provider also has local supplies which are used to meet the demands of their customers. Although these systems are connected, they are not operated or managed in a coordinated manner, especially in times of water shortage.

Funds expended between FY 19/20 and FY24/25 for the Regional Water Supply Resiliency Study were used to build a decision support model to evaluate the region’s resiliency to drought, and natural hazards such as seismic events, wildfires and flooding. Based on modeling scenarios completed for the development and evaluation of projects and strategies to improve the regions water supply reliability during periods of water supply shortage due to drought and seismic events, development of regional water banking strategies were identified as priority initiatives to pursue to improve the regions water supply resiliency. Funds budgeted for FY 24/25 and FY 25/26 will be used to implement priority recommendations from the Regional Water Supply Resiliency Study to develop a Regional Water Bank Implementation Strategy, which would provide a mechanism to integrate the most significant regional water storage facilities (Lake Sonoma, Santa Rosa Plain groundwater basin, Sonoma Valley groundwater basin, Petaluma Valley groundwater basin, Lake Stafford, and reservoirs operated and managed by Marin Water), using Sonoma Water's transmission system as the backbone. Surplus surface water during wet periods could be stored in surface reservoirs or groundwater basins and subsequently extracted during critical drought periods or emergencies thus providing improved resilience and reliability to the region. In FY24/25, Sonoma Water entered into an agreement with Jacobs Enginering Group to implement the support development of an implementation strategy. Activities in FY25/26 include developing initial goals and objectives, key components and potential constraints for a water bank, meeting with Water Supply Contractors and GSAs to determine potential participants and performing intial analysis of opportunities.

Activities planned for FY26/27 will include (1) develop and apply regional water bank model; (2) stakeholder engagement and outreach; (3) develop funding approach and implementation schedule; and (4) prepare implementation strategy report
SCADA System Contributions 2,552,900
The SCADA System Contributions line-item funds the Water Transmission System’s portion of routine operations and maintenance of Sonoma Water’s SCADA system (including SCADA staff labor) as well as capital improvement projects.

Routine work to operate and maintain the SCADA system on an annual basis includes monitoring system performance, performing software updates and patching, maintaining and replacing hardware, troubleshooting issues, providing user training and support, assessing and revamping programming standards to accommodate new/modified processes and current technologies, and implementing new standards to streamline maintenance and operations.

In addition to annual, routine work, Sonoma Water has undertaken several capital improvement projects to improve the SCADA system over the last few years. These projects are identified in Sonoma Water’s SCADA Master Plan.

In FY25/26, we completed the design for a SCADA radio system replacement. Due to the scale and complexity of the project—which includes six primary sites and more than 70 remote sites—the installation has been divided into three phases. The first phase is currently underway and will be completed by the end of FY25/26. The second phase is scheduled for completion in FY26/27, and the final phase is expected to be finished in FY27/28.

During FY25/26, we also completed the design for a SCADA network upgrade that will deliver significant improvements in security and reliability. Since then, we have worked with AT&T to establish new dedicated fiber connections to 12 facilities, and we are currently testing new hardware to replace legacy phone dialers with modern cellular equipment.

Installation of the network equipment will begin in late FY25/26 and is expected to continue into FY26/27. 2/11/2026
22 51803 Other Contract Services & 51509 SCADA System Contributions Project Information FY26-27
Tank Maintenance Program 340,348
Sonoma County Water Agency (Sonoma Water) owns and operates 18 water storage tanks with a total combined capacity of 128.8 million gallons as a part of the water transmission system that provides clean drinking water to approximately 600,000 residents in nine major cities and water districts within Sonoma and Marin counties. Maintaining these tanks is critical. This program covers a 10-year agreement for maintenance services with a Service Provider.

Since Fall 2025, Sonoma Water has completed enhanced washout cleaning, inspections, and minor repairs to 12 of the 18 tanks. Of the remaining six tanks, five have either been fully renovated or are in the process of renovation, and the one remaining tank (Eldridge #2) is scheduled for enhanced washout, inspection, and repairs this winter. In FY 26/27, Sonoma Water will continue to conduct visual inspections of the tanks and, if needed, perform minor repairs.

Tank Rehabilitation Program 7,970,107
Water storage tanks are an integral component of Sonoma Water’s transmission and supply system and provide operational flexibility and system supply resiliency when demand exceeds production capacity. In total, Sonoma Water’s 18 welded steel water tanks provide 129 million gallons of storage, which is approximately three times the average daily system demand. Welded-steel tanks are susceptible to corrosion and have a limited functional lifespan of approximately 50 years without coatings. With regularly scheduled and targeted maintenance, monitoring, and recoating activities welded-steel tanks can attain a lifespan of over 100 years. Sonoma Water’s Tank Recoating Program specifically targets the protection and maintenance of welded-steel tanks by designing and implementing tank rehabilitation projects that include interior and exterior recoating, structural repairs, and installation of cathodic protection systems to maximize the functional life of each facility.

In FY 24/25 Sonoma water completed recoating at Kastania and Cotati No. 1. Design also progressed to completion for the Cotati No. 3 recoating project and was advertised for bids and awarded in January of 2025. Construction began in March 2025 and is expected to continue to February 2026.

In FY 25/26, design began in earnest for Ralphine No. 1 and Sonoma No. 1 recoating project. The project designs were also coordinated with the broader tank seismic project. The Ralphine No. 1 project is scheduled to advertise in January 2026 with a target contsruction award of April 2026. The Sonoma No. 1 project is scheduled to advertise in March 2026 with a target construction award of June or July 2026. Construction also continued to advance at Cotati No. 3 and is anticipated to wrap up in March or April 2026. Design agreements for Ralphine No. 2 and Sonoma No. 2 are also expected to occur with design commencing for both projects.

In FY26/27, construction of Ralphine No. 1 and Sonoma No. 1 will continue to advance. The Ralphine No. 2 and Sonoma No. 2 tank recoat designs will also continue to advance with a target advertise date of January 2027.

Consultant design agreements will also be contracted for the next two tanks ( Eldrige No. 2 and Kawana Springs No. 1) in early FY26/27 and possibly for Cotati No. 2 and Annadel No. 1 in late FY26/27.

Warm Springs Dam Hydropower FERC Relicensing 100,000
The Federal Energy Regulatory Commission (FERC) operating license for the Warm Springs Dam Hydropower project expires in 2032. Based on discussions with outside FERC counsel, it is recommended that the relicensing process be started five years prior to the license expiring. Consequently, funds will be required in FY 26/27 to retain a consultant with FERC relicensing expertise.
2/11/2026
23 51803 Other Contract Services & 51509 SCADA System Contributions Project Information FY26-27
Studies/Planning
DeMuth Property Hydrogeologic Investigation 150,000
The DeMuth property hydrogeologic investigation will advance feasibility evaluation of siting additional diversion facilities (i.e., a well field or additional collector well) within the DeMuth parcels adjoining the eastern bank of the Russian River, just south of Wohler Bridge. In December 2023, two monitoring wells were drilled and constructed on the parcel using Sonic drill rig. Continuous core samples collected during the drilling of the boreholes were comprised primarily of course sands and gravels. The monitoring wells have been equipped pressure/temperature transducers that will be collecting hourly water level and temperature data throughout the winter and spring of 2024. In December 2023, Sonoma Water entered into an agreement with Collier Geophysics to perform land based geophysics at the parcel. The geophysical investigation was completed in FY24/25. Based on the information provided by the monitoring wells and ground based geophysics, in FY25/26 Sonoma Water staff have planned and implemented drilling and constructing 2 additional monitoring wells and initiated the design for a high capacity test well planned to be constructed by summer 2026. Activities planned for FY26/27 include completing the test well construction and development and performing and analyzing a step-drawdown pump test and aquifer pump test. Additional future work may also include: (1) leveraging existing internal modeling tools to estimate well production efficiencies and potential well interference with existing collector wells and nearby irrigation wells; and (2) assessing strategies for mitigating seismic risks to existing Wohler/Mirabel diversion facilities by siting new diversion facilities on the DeMuth parcels.

Natural Hazard Reliability Study 100,000
The seismic mitigation planning study will advance feasibility evaluation and refine strategic approaches to implementing measures to mitigate failure risks of the water transmission system to specific seismic vulnerabilities identified as part of prior natural hazard reliability studies. Particular focus of the study will evaluate: 1) liquefaction mitigation solutions to protect collector wells at the Wohler-Mirabel production facilities, 2) strategies that best balance risk mitigation of aqueduct failure at numerous locations of potential seismic vulnerability against a cost-effective and timely implementation approach (including conducting a broad CPT investigation at numerous sites), and 3) analyze alternative seismic retrofit solutions at select water storage tanks.

In FY 22/23, a consultant was contracted to initiate the planning study, coordinating geotechnical investigations, and securing necessary permits and permission to enter agreements. In FY23/24, CPT investigations were performed along with seismic assessment of the water storage tanks. Preliminary design of liquefaction mitigation solution of Collector 5 was also commenced to assess feasibility of implementing a secant pile wall concept. In FY24/25, funding was utilized to finalize the preliminary design of Collector 5, assess the feasibility to expand design concepts to other collectors, and update the aqueduct seismic risk analysis based on new geotechnical data. In FY25/26, funding will be used will be utilized to develop to develop a prioritization framework for seismic mitigation projects and complete a final report. In FY26/27, funding will be used to update the draft Seismic Assessment of Water Storage Tanks report with site specific geotechnical data that is planned to be collected.

Transmission System Condition Assessments 411,350
During FY24/25, Sonoma Water under the Asset Management Program started an Aqueduct Condition Assessment report that reviews the water system's pipeline infrastructure, developed a risk-based prioritization model for inspections, and evaluates the current market of inspection technologies. During FY25/26, the report will be finalized and a work plan developed that outlines the strategic approach to pipeline inspections and monitoring. The first inspection project contract under this program is planned for FY26/27. 2/11/2026
24 51803 Other Contract Services & 51509 SCADA System Contributions Project Information FY26-27
Water System Comprehensive Plan 210,000
Sonoma Water aims to develop a Comprehensive Water System Master Plan (Master Plan) to define the programs, policies, and projects required to meet the potable water infrastructure needs of Sonoma Water’s service area for the next 20-years. Master Plan development will consider future system demands, current system conditions, and required system improvements. This Master Plan will yield a prioritized list of projects, serving as a guide for financial commitments needed to ensure sufficient operation of the water system’s infrastructure. In FY23/24, a consultant was brought under contract and a kick off meeting was held. During FY 24/25, data was collected about the Water System and compiled into Technical Memorandum 1 to provide a baseline. Sonoma Water coordinated with its Water Contracts to begin demand forecasting. In FY 25/26, a methodology for project prioritization was established that can be used across Sonoma Water’s enterprises. Additional SCADA data was compiled and sent to consultant to calibrate their hydraulic model, which will be used to forecast required infrastructure improvements over the next 20-years.

Water Demand Forecasting is set to begin in Q1 of 2026 with hydraulic modeling and project identification to follow this fiscal year.

Watershed Water Quality Study - LBNL and LBNL 447,500
Sonoma Water’s riverbank filtration (RBF) facilities leverage the natural subsurface sediments to remove chemical pollutants and waterborne pathogens via filtration, adsorption, and degradation. RBF is a low cost and sustainable alternative to traditional drinking water treatment because it relies on natural filtration processes rather than a traditionally engineered water treatment system. Unlike an engineered system, the nature of RBF requires scientific study of the natural system processes to demonstrate continued efficacy amidst changing environmental pressures.

Sonoma Water has funded studies in collaboration with USGS and LBNL to develop a robust scientific research program to demonstrate the efficacy of RBF to regulators, to understand the processes that contribute to the efficacy of RBF, and to identify any potential vulnerabilities (e.g., drought, wildfire, emerging contaminants of concern).

Following the most recent drought, historically low water levels and reductions in collector efficiency were observed in Collector 6 during summer and fall, 2021. In response, USGS and LBNL developed a monitoring program to assess the role of Russian River streambed clogging (both microbial and physical) on observed reductions in collector efficiency at Wohler and Mirabel. Funds budgeted during FY23/24 and FY24/25 were used to deploy >40 sensors to measure streambed infiltration in the river adjacent to Collectors 1, 2, and 6, collect groundwater, surface water, and streambed water chemistry samples, and conduct geophysical surveying to better understand the development, persistence, and impacts of streambed clogging and its potential impacts on RBF. Funds budgeted for FY25/26 were used to complete data collection and interpretation, ultimately resulting in publication of the study findings in the peerreviewed scientific literature. Funds budgeted for FY 26/27 will be used to continue data collection and interpretation, with additional study of RBF vulnerabilities to post-wildfire water chemistry changes. Results from this study will help inform operational decision-making and improve system resilience for Sonoma Water’s RBF facilities amidst drought, wildfire, and future climate-change impacts.
2/11/2026
25 FY 2026-27 BUDGET

BEGINNING AND ENDING CASH SUMMARY
Section Title: Water Management Planning
Fund/Department No: 44210 33041000
Actual Estimated Adopted Requested Percent
Account Title 2024-2025 2025-2026 2025-2026 2026-27 Difference Change BEGINNING FUND BALANCE 344,187 319,719 138,878

REVENUES

USE OF MONEY / PROPERTY
44002 Interest on Pooled Cash 14,733 4,550 4,550 3,592 (958) (21.05%) SUBTOTAL 14,733 4,550 4,550 3,592 (958) (21.05%)

INTERGOVERNMENTAL REVENUE
42619 Town of Windsor 910 11,126 11,126 6,404 (4,722) (42.44%) SUBTOTAL 910 11,126 11,126 6,404 (4,722) (42.44%)

CHARGES FOR SERVICES
SUBTOTAL 0 0 0 0 0 N/A

OTHER FINANCING SOURCES
47101 Transfers In - within a Fund 16,232 194,000 194,000 110,000 (84,000) (43.30%) 47102 Transfers In - btw Govtl Fund 0 0 0 0 0 N/A
SUBTOTAL 16,232 194,000 194,000 110,000 (84,000) (43.30%) TOTAL REVENUES 31,876 209,676 209,676 119,996 (89,680) (42.77%)

EXPENDITURES

SERVICES AND SUPPLIES
51211 Legal Services 314 0 0 0 0 N/A
51803 Other Contract Services 5,349 230,000 230,000 80,000 (150,000) (65.22%) 51917 District Operations Chgs 40,878 160,517 120,000 80,000 (40,000) (33.33%) SUBTOTAL 46,541 390,517 350,000 160,000 (190,000) (54.29%)

OTHER CHARGES
SUBTOTAL 0 0 0 0 0 N/A

OTHER FINANCING USES
57011 Transfers Out - within a Fund 0 0 0 0 0 N/A
57012 Transfers Out - btw Govtl Fun 0 0 0 0 0 N/A
SUBTOTAL 0 0 0 0 0 N/A
TOTAL EXPENDITURES 46,541 390,517 350,000 160,000 (190,000) (54.29%) Adjustments to Reserves/Encumbrances:

Outstanding Encumbrances - Net Change (9,803) 0 0
ENDING FUND BALANCE 319,719 138,878 98,874
2/11/2026
26 FY 2026-27 BUDGET

BEGINNING AND ENDING CASH SUMMARY
Section Title: Watershed Planning/Restoration
Fund/Department No: 44215 33041100
Actual Estimated Adopted Requested Percent
Account Title 2024-2025 2025-2026 2025-2026 2026-27 Difference Change BEGINNING FUND BALANCE 10,444,098 10,588,305 3,015,731

REVENUES

USE OF MONEY / PROPERTY
44002 Interest on Pooled Cash 457,539 71,964 71,964 60,833 (11,130) (15.47%) SUBTOTAL 457,539 71,964 71,964 60,833 (11,130) (15.47%)

INTERGOVERNMENTAL REVENUE
42619 Town of Windsor 104,121 111,163 111,163 232,047 120,884 108.74% SUBTOTAL 104,121 111,163 111,163 232,047 120,884 108.74%

CHARGES FOR SERVICES
45301 Charges for Services 107,940 0 0 0 0 N/A
45332 Watershed Plan/Restore Chg 16,542 40,000 40,000 40,000 0 0.00% Subtotal Charges for Service 124,481 40,000 40,000 40,000 0 0.00%

MISCELLANEOUS REVENUE
46200 Revenue Appl PY Misc Revenu (10,077) 0 0 0 0 N/A
SUBTOTAL (10,077) 0 0 0 0 N/A

OTHER FINANCING SOURCES
47101 Transfers In - within a Fund 1,854,107 1,938,370 1,938,370 3,986,054 2,047,684 105.64% 47102 Transfers In - btw Govtl Funds 0 0 0 0 0 N/A
SUBTOTAL 1,854,107 1,938,370 1,938,370 3,986,054 2,047,684 105.64% TOTAL REVENUES 2,530,170 2,161,497 2,161,497 4,318,934 2,157,437 99.81%

EXPENDITURES

SERVICES AND SUPPLIES
51061 Maintenance - Equipment 226 0 0 0 0 N/A
51205 Advertising Marketing 952 0 0 0 0 N/A
51209 Information Tech Svc (non ISD 474 0 0 0 0 N/A
51211 Legal Services 16,874 0 0 0 0 N/A
51231 Testing/Analysis 88,532 0 0 0 0 N/A
51241 Outside Printing and Binding 1,168 0 0 0 0 N/A
51243 Filing Fees 100 0 0 0 0 N/A
51244 Publications and Legal Notices 57,687 0 0 0 0 N/A 51301 Permits/License/Fees 504 0 0 0 0 N/A
51402 Rents and Leases - Heavy Eqt 9,678 0 0 0 0 N/A
51605 Private Car Expense 1,516 0 0 0 0 N/A
51803 Other Contract Services 535,882 2,552,961 1,993,000 2,643,354 650,354 32.63% 51917 District Operations Chgs 1,880,479 5,328,474 2,977,370 3,536,700 559,330 18.79% 51921 Equipment Usage Charges 17,380 0 0 0 0 N/A
2/11/2026
27 Section Title: Watershed Planning/Restoration
Fund/Department No: 44215 33041100
Actual Estimated Adopted Requested Percent
Account Title 2024-2025 2025-2026 2025-2026 2026-27 Difference Change 52021 Clothing, Uniforms, Personal 805 0 0 0 0 N/A
52031 Food 40 0 0 0 0 N/A
52042 Janitorial Supplies 19 0 0 0 0 N/A
52043 Safety Supplies/Equipment 22 0 0 0 0 N/A
52071 Materials and Supplies Expens 50,209 0 0 0 0 N/A
52081 Medical/Laboratory Supplies (303) 0 0 0 0 N/A
52091 Memberships/Certifications 0 0 0 0 0 N/A
52101 Other Supplies 0 160,000 160,000 196,000 36,000 22.50% 52111 Office Supplies 11 0 0 0 0 N/A
52115 Books/Media 96 0 0 0 0 N/A
52117 Mail and Postage Supplies 90 0 0 0 0 N/A
52141 Minor Equipment/Small Tools 38 0 0 0 0 N/A
52143 Computer Software 675 0 0 0 0 N/A
SUBTOTAL 2,663,153 8,041,435 5,130,370 6,376,054 1,245,684 24.28%

OTHER CHARGES
53402 Depreciation Expense 9,351 8,000 8,000 10,000 2,000 25.00% SUBTOTAL 9,351 8,000 8,000 10,000 2,000 25.00%

REIMBURSEMENTS
SUBTOTAL 0 0 0 0 0 N/A

FIXED ASSETS
19841 Acq-WIP-Intangibles 30,580 1,692,636 0 0 0 N/A
SUBTOTAL 30,580 1,692,636 0 0 0 N/A

OTHER FINANCING USES
57011 Transfers Out - within a Fund 0 0 0 0 0 N/A
57012 Transfers Out - btw Govtl Fund 0 0 0 0 0 N/A
SUBTOTAL 0 0 0 0 0 N/A
TOTAL EXPENDITURES 2,703,083 9,742,071 5,138,370 6,386,054 1,247,684 24.28% Adjustments to Reserves/Encumbrances:

Outstanding Encumbrances - Net Change 297,691 0
Depreciation 9,351 8,000 10,000
Gain/loss on disposal of Capital Assets 10,077
Rounding 1 0
ENDING FUND BALANCE 10,588,305 3,015,731 958,611
2/11/2026
28 FY 2026-27 BUDGET

BEGINNING AND ENDING CASH SUMMARY
Section Title: Recycled Water and Local Supply
Fund/Department No: 44220 33041200
Actual Estimated Adopted Requested Percent
Account Title 2024-2025 2025-2026 2025-2026 2026-27 Difference Change BEGINNING FUND BALANCE (13,255) 259,676 266,020

REVENUES

USE OF MONEY / PROPERTY
44002 Interest on Pooled Cash 17,857 0 0 8,199 8,199 N/A SUBTOTAL 17,857 0 0 8,199 8,199 N/A

INTERGOVERNMENTAL REVENUE
42619 Town of Windsor 0 344 344 0 (344) (100.00%)
SUBTOTAL 0 344 344 0 (344) (100.00%)

OTHER FINANCING SOURCES
47101 Transfers In - within a Fund 0 6,000 6,000 0 (6,000) (100.00%) 47102 Transfers In - btw Govtl Funds 0 0 0 0 0 N/A
SUBTOTAL 0 6,000 6,000 0 (6,000) (100.00%)
TOTAL REVENUES 17,857 6,344 6,344 8,199 1,855 29.24%

EXPENDITURES

SERVICES AND SUPPLIES
51803 Other Contract Services 42,454 0 0 0 0 N/A
51917 District Operations Chgs 3,030 0 0 0 0 N/A
SUBTOTAL 45,484 0 0 0 0 N/A

OTHER CHARGES
53402 Depreciation Expense 5,966 6,000 6,000 6,000 0 0.00% SUBTOTAL 5,966 6,000 6,000 6,000 0 0.00%

OTHER FINANCING USES
57011 Transfers Out - within a Fund 0 0 0 0 0 N/A
57012 Transfers Out - btw Govtl Fund 0 0 0 0 0 N/A
SUBTOTAL 0 0 0 0 0 N/A
TOTAL EXPENDITURES 51,450 6,000 6,000 6,000 0 0.00%
Adjustments to Reserves/Encumbrances:

Outstanding Encumbrances - Net Change 150,279 0
Change in Windsor Reserve 150,279 0
Depreciation 5,966 6,000 6,000
ENDING FUND BALANCE 259,676 266,020 274,219
2/11/2026
29 FY 2026-27 BUDGET

BEGINNING AND ENDING CASH SUMMARY
Section Title: Water Conservation
Fund/Department No: 44225 33041300
Actual Estimated Adopted Requested Percent
Account Title 2024-2025 2025-2026 2025-2026 2026-27 Difference Change BEGINNING FUND BALANCE 48,878 69,194 (2,242)

REVENUES

USE OF MONEY / PROPERTY
44002 Interest on Pooled Cash (1,285) 1,806 1,806 1,025 (781) (43.24%) SUBTOTAL (1,285) 1,806 1,806 1,025 (781) (43.24%)

INTERGOVERNMENTAL REVENUE
42358 State Other Funding 424,940 38,000 38,000 0 (38,000) (100.00%) 42461 Federal Other Funding 471,651 1,501,000 35,000 34,871 (129) (0.37%) 42601 County of Sonoma 71,807 0 0 0 0 N/A
42619 Town of Windsor 154,856 155,237 155,237 175,420 20,183 13.00% 42621 North Marin Water District 0 0 0 0 0 N/A
SUBTOTAL 1,123,254 1,694,237 228,237 210,291 (17,946) (7.86%)

CHARGES FOR SERVICES
45301 Charges for Services 41,989 42,000 42,000 42,000 0 0.00% 45316 Water Conservation 1,893 0 0 0 0 N/A
SUBTOTAL 43,882 42,000 42,000 42,000 0 0.00%

MISCELLANEOUS REVENUE
46029 Donations/Contributions 0 316,000 316,000 326,500 10,500 3.32% 46050 Cancelled/Stale Dated Warrants 7 0 0 0 0 N/A
46200 Revenue Appl PY Misc Revenue 100,000 0 0 0 0 N/A
SUBTOTAL 100,007 316,000 316,000 326,500 10,500 3.32%

OTHER FINANCING SOURCES
47101 Transfers In - within a Fund 2,757,598 2,706,900 2,706,900 3,013,329 306,429 11.32% 47102 Transfers In - btw Govtl Funds 0 0 0 0 0 N/A
SUBTOTAL 2,757,598 2,706,900 2,706,900 3,013,329 306,429 11.32% TOTAL REVENUES 4,023,456 4,760,943 3,294,943 3,593,145 298,202 9.05%

EXPENDITURES

SERVICES AND SUPPLIES
51061 Maintenance - Equipment 401 0 0 0 0 N/A
51205 Advertising/Marketing Svc 20,251 0 0 0 0 N/A
51209 Information Tech Svc (non ISD) 1,375 0 0 0 0 N/A
2/11/2026
30 Section Title: Water Conservation
Fund/Department No: 44225 33041300
Actual Estimated Adopted Requested Percent
Account Title 2024-2025 2025-2026 2025-2026 2026-27 Difference Change 51211 Legal Services 3,062 0 0 0 0 N/A
51241 Outside Printing and Binding 28,011 41,000 41,000 51,000 10,000 24.39% 51401 Rents and Leases - Equipment 1,187 0 0 0 0 N/A
51601 Training Services 5,082 0 0 0 0 N/A
51602 Business Travel/Mileage 10,112 13,000 13,000 13,000 0 0.00% 51605 Private Car Expense 293 0 0 0 0 N/A
51803 Other Contract Services 231,688 548,400 498,400 472,700 (25,700) (5.16%) 51911 Mail Services 152 0 0 0 0 N/A
51917 District Operations Chgs 2,519,309 2,500,000 2,500,000 2,600,000 100,000 4.00% 51921 Equipment Usage Charges 10,404 0 0 0 0 N/A
52021 Clothing, Uniforms 67 0 0 0 0 N/A
52031 Food 607 0 0 0 0 N/A
52071 Materials and Supplies Expense 53,757 81,000 81,000 89,000 8,000 9.88% 52091 Memberships/Certifications 5,679 6,000 6,000 7,500 1,500 25.00% 52111 Office Supplies 70 0 0 0 0 N/A
52115 Books/Media/Subscriptions 1,029 0 0 0 0 N/A
52117 Mail and Postage Supplies 132 0 0 0 0 N/A
52143 Computer Software/Licensing Fees 1,060 0 0 0 0 N/A 52171 Water Conservation Program 50,000 166,500 166,500 296,500 130,000 78.08% SUBTOTAL 2,943,728 3,355,900 3,305,900 3,529,700 223,800 6.77%

OTHER CHARGES
53501 Contributions 823,511 1,476,479 0 0 0 N/A
53502 Community Grants 0 0 0 5,000 5,000 N/A
SUBTOTAL 823,511 1,476,479 0 5,000 5,000 N/A

OTHER FINANCING USES
57011 Transfers Out - within a Fund 0 0 0 0 0 N/A
57012 Transfers Out - btw Govtl Fund 0 0 0 0 0 N/A
SUBTOTAL 0 0 0 0 0 N/A
TOTAL EXPENDITURES 3,767,238 4,832,379 3,305,900 3,534,700 228,800 6.92% Adjustments to Reserves/Encumbrances:

Outstanding Encumbrances - Net Chang 62,149 0 0
Change in Windsor Reserve (92,234) 0 0
Post Audit Adjustment (205,816) 0 0
Rounding (1) 0 0
ENDING FUND BALANCE 69,194 (2,242) 56,203
2/11/2026
31 Water Transmission Budget
2026-27
Itemized Detail for Subfunds Consulting/Contractual Services Budget FY26-27
Water Management Planning
Urban Water Management Plan: Develop scope, cost, and schedule to complete an update to Sonoma Water’s UWMP and preparation and submittal of the required UWMP to the Department of Water Resources by July 1, 2026. Results of the 2025 UWMP update are required to inform the work of Sonoma Water’s contractors’ UWMP updates to DWR.
$ 50,000
Annual Water Supply and Demand Assessment: Develop scope, cost, and schedule to complete a water supply and demand analysis and preparation and submittal of the required Annual Water Shortage Assessment Report to the Department of Water Resources by July 1 each year. Results of the Annual Assessment are also required to inform the work of Sonoma Water’s contractors’ Assessment Reports to DWR.

In FY 24-25 the AWSDA report was completed as described and results shared with the water contractors to inform the completion of their reports.

Sonoma Water’s completed AWSDA was filed with DWR prior to the July 1, 2025 reporting deadline. In FY 25-26 the AWSDA will again be completed as described and results shared with the water contractors to inform the completion of their reports. Sonoma Water’s completed AWSDA will be filed with DWR prior to the July 1, 2026 reporting deadline. A new agreement will be implemented for this work in FY 26-27. $ 30,000
Watershed Planning/Restoration
RRIFR Decision 1610 Change Petition: Russian River Flows and Fish Flow Project EIR: Continued work on Fish Habitat Flows and Water Rights Project (Fish Flow Project EIR) in preparation for any additional impact analysis, flow modeling, and monitoring needed. The EIR is being prepared by Sonoma Water staff, with assistance from consultants in some areas of analysis. In FY24/25, most of the work focused on submission of annual Temporary Urgency Change (TUC) Petitions to the State Board to approve the requested changes to minimum in-stream flows as identified in the Biological Opinion and fisheries and water quality monitoring and reporting required by any State Board TUC Order. Work being accomplished in FY25/26 includes updates project analysis, and lab analysis for water quality monitoring under TUC Orders. Work anticipated for FY26/27 includes work on the hydrologic index alternatives and water quality and flow modeling, as well as lab analysis for water quality monitoring related to TUCs. $ 433,000
RRIFR Estuary Management: Required Annual Biological Opinion Activities: Sonoma Water, in consultation with the National Marine Fisheries Service (NMFS), California Department of Fish & Wildlife (CDFW) and the U.S. Army Corps of Engineers (Corps), is required to annually prepare an adaptive management plan; conduct and record monthly surveys of the beach topography; use a time lapse video camera to record the interaction of waves, tides and the river mouth; conduct baseline monitoring of seals and other pinnipeds, conduct estuary water quality monitoring, conduct juvenile steelhead and coho salmon rearing surveys, and prepare annual reports. Other FY25/26 activities include installation and monitoring of downstream migrant salmonid traps and water quality monitoring stations. Work being completed in FY25/26 includes preparation of the annual adaptive management plan, renewing regulatory permits, and continuation of monitoring and studies. Work anticipated for FY26/27 includes renewing regulatory permits and monitoring studies.
$ 965,000
Upper Russian River Water Quality Monitoring: This water quality monitoring was conducted for the Upper Russian River, including the East Fork Russian River above Lake Mendocino and Lake Mendocino to contribute to planning and modeling efforts for the Potter Valley Project (PVP), Lake Mendocino management, Fish Habitat Flows and Water Rights Project, the Forecast Informed Reservoir Operations (FIRO) projects, and TUC orders.

Monitoring included the deployment of datasondes and collection of grab samples, as well as laboratory analysis. Work anticipated for FY26/27 includes the efforts described above.
$ 25,000
2/11/2026
32 Water Transmission Budget
2026-27
Itemized Detail for Subfunds Consulting/Contractual Services Budget FY26-27
Dry Creek: To comply with the Biological Opinion’s Dry Creek Adaptive Management Plan, in FY 25/26 Sonoma Water Environmental Resources staff monitored 14 enhancement reaches during the 2025 monitoring season. A contractor completed maintenance activities (sediment and vegetation management) in Reach 8. Staff also installed over 2,000 willow cuttings at three sites in Reach 10 to assist with bank stabilization. Staff continue to work on long-term programmatic permit applications to the California Department of Fish and Wildlife, Regional Water Quality Control Board, and Army Corps of Engineers for maintenance of previously constructed sites and planned maintenance for several enhancement reaches in 2026. In addition to planned monitoring and maintenance in FY 26/27, the 2025 Biological Opinion requires Sonoma Water to fund a small-scale habitat enhancement project while an alternative to the U.S. Army Corps of Engineers Phase III project is being developed. Sonoma staff are requesting $250,000 from the Watershed Planning and Restoration Fund to support a habitat enhancement project being implemented on Mill Creek, a major tributary to Dry Creek, to satisfy this requirement. Staff are also working with the Army Corps to finalize the Operations and Maintenance Manual for completed Dry Creek enhancement projects. A portion of the requested funds in FY 26/27 will also contribute to Sonoma Water’s cost-share requires for the Army Corps project. $ 1,020,354
Landscape Resiliency: Multiyear fire landscape resiliency effort at Lake Sonoma to protect source water quality in partnership with the U.S. Army Corps and CalFire. In FY25/26, met with CalFire and USACE to identify areas that require vegetation treatment, conducted vegetation management, and facilitated CalFire controlled burns. The same tasks will be undertaken in FY 26-27. $ 200,000
$ 2,643,354
Recycled Water and Local Supply
Recycled Water and Local Supply costs have historically been for Sonoma Water’s share of the groundwater sustainability agency’s contributions.

Sonoma Water’s share of mandatory fees has been included in the Agency Operating fund in FY 2026/2027. $ - $ -
Water Conservation
51241-Outside Printing and Binding
WUE/Water Ed Program materials, Eco-Friendly Garden Tour materials, Water Smart Plant Label materials. $ 51,000 51602-Business Travel/Mileage
Attend local and statewide meetings representing the Partnership and Sonoma Water. $ 13,000 51803-Other Contract Services
Garden Sense Contract: Funding provides onsite visits by local master gardeners to support local turf removal programs. $ 20,000 Green Business Program: Funding to staff a part time position which provides water assessments for local businesses pursuing the Green Business Certification. $ 30,000
Educational Content: Displays for Education Center. $ 10,000 Plant Labeling Program: Funding for nursery liaison to ensure locally appropriate plants are labeled, nursery staff trainings, outreach tabling. $ 20,000 QWEL: QWEL website and database maintenance contract, QWEL trainings. $ 40,000 Sonoma County Fair: Sponsorship of general WUE display/materials at the Sonoma County Fair. $ 8,000 2/11/2026
33 Water Transmission Budget
2026-27
Itemized Detail for Subfunds Consulting/Contractual Services Budget FY26-27
SMSWP website: Website hosting, maintenance, and development. $ 8,500 Spatial Analysis: CII Landscape Measurements for contractors. $ - Water Ed Bus Contract: Shuttle from school to field study sites for Water Education Program. $ 50,000 Water Loss Programs: Technical assistance for regional water loss meetings and audit validations. $ 36,200 $ 472,700
51917-District Operations Chgs
Salaries, benefits and overhead costs for staff assigned to projects budgeted within the Water Conservation Fund (Includes USBR WaterSMART Grant). $ 2,600,000 52071-Materials and Supplies Expense
Water Ed Teaching Materials: pH strips, fabric for displays, youth outreach displays, pencil sharpeners, pencils, classroom testing kits, maps, workbooks, rulers, toothbrushes, stickers, etc. Garden Tour, fair demo garden signage. $ 89,000 52091-Memberships/Certifications
Irrigation Association and AWWA Certificate Renewals, Water Education Foundation, and California Water Efficiency Partnership, Alliance for Water Efficiency, etc. $ 7,500
52171-Water Conservation Program
Outdoor Water Use Focused Programs: Russian River Friendly Workshops, Living Learning Landscapes Demo Gardens, etc. $ 1,500 Public Information/Outreach Programs: Media campaigns for the Sonoma-Marin Saving Water Partnership including media ad buys, ad development. $ 180,000 Saving Water Partnership Wholesaler Support: Acting as the regional liaison attend meetings of the CalWEP, Alliance for Water Efficiency, ACWA, Urban Advisory Group, CA Science Teachers Association, environmental education conference. $ 20,000 School Education Program: Such as assembly program, port-a-potties, steelhead in the classroom program, youth outreach events, teacher program, teacher trainings, educational workbooks, maps. $ 70,000 Seminars, Workshops, Training: Host trainings/ workshops to benefit the Partnership, such as Statewide Framework, Water Loss, NFT, speakers’ bureau. Participation in national/statewide studies such as those conducted by CalWEP and AWE. $ 25,000 $ 296,500
Total $ 3,529,700
2/11/2026
34 FY 2026-27 BUDGET

BEGINNING AND ENDING CASH SUMMARY
Section Title: Santa Rosa Aqueduct Capital Fund
Fund/Department No: 44230 33045000
Actual Estimated Adopted Requested Percent
Account Title 2024-2025 2025-2026 2025-2026 2026-27 Difference Change BEGINNING FUND BALANCE 10,305,302 10,959,009 10,733,771

REVENUES

USE OF MONEY / PROPERTY
44002 Interest on Pooled Cash 407,954 310,281 310,281 331,956 21,675 6.99% SUBTOTAL 407,954 310,281 310,281 331,956 21,675 6.99%

OTHER FINANCING SOURCES
47101 Transfers In - within a F 351,710 309,921 309,921 323,068 13,147 4.24% SUBTOTAL 351,710 309,921 309,921 323,068 13,147 4.24%
TOTAL REVENUES 759,663 620,202 620,202 655,024 34,822 5.61%

EXPENDITURES

FIXED ASSETS
19832 CIP - Infrastructure 69,562 845,440 130,247 0 (130,247) (100.00%) SUBTOTAL 69,562 845,440 130,247 0 (130,247) (100.00%)

OTHER FINANCING USES
57011 Transfers Out - within a 0 0 0 0 0 N/A
SUBTOTAL 0 0 0 0 0 N/A
TOTAL EXPENDITURES 69,562 845,440 130,247 0 (130,247) (100.00%) Adjustments to Reserves/Encumbrances:

Unrealized Gain/ Loss (GASB 31) (36,393) 0 0
Rounding (1) 0 0
ENDING FUND BALANCE 10,959,009 10,733,771 11,388,796
2/11/2026
35 FY 2026-27 BUDGET

BEGINNING AND ENDING CASH SUMMARY
Section Title: Petaluma Aqueduct Capital Fund
Fund/Department No: 44235 33045100
Actual Estimated Adopted Requested Percent
Account Title 2024-2025 2025-2026 2025-2026 2026-27 Difference Change BEGINNING FUND BALANCE 3,817,392 3,870,847 (492,431)

REVENUES

USE OF MONEY / PROPERTY
44002 Interest on Pooled Cash 280,517 28,633 28,633 574 (28,059) (98.00%) SUBTOTAL 280,517 28,633 28,633 574 (28,059) (98.00%)

MISCELLANEOUS REVENUE
46021 Capital Gains - Federal 509,747 1,624,391 0 0 0 N/A SUBTOTAL 509,747 1,624,391 0 0 0 N/A

OTHER FINANCING SOURCES
47101 Transfers In - within a Fund 87,788 1,571,766 1,571,766 1,667,288 95,522 6.08% SUBTOTAL 87,788 1,571,766 1,571,766 1,667,288 95,522 6.08% TOTAL REVENUES 878,053 3,224,790 1,600,399 1,667,862 67,463 4.22%

EXPENDITURES

FIXED ASSETS
19832 CIP - Infrastructure 1,676,597 7,588,067 3,119,107 548,910 (2,570,197) (82.40%) 19841 Work in Progress - Intang 1,619 0 0 0 0 N/A
SUBTOTAL 1,678,216 7,588,067 3,119,107 548,910 (2,570,197) (82.40%)

OTHER FINANCING USES
57011 Transfers Out - within a Fund 0 0 0 0 0 N/A
SUBTOTAL 0 0 0 0 0 N/A
TOTAL EXPENDITURES 1,678,216 7,588,067 3,119,107 548,910 (2,570,197) (82.40%) Adjustments to Reserves/Encumbrances:

Change in Encumbrances 849,391 0 0
Rounding 4,228
ENDING FUND BALANCE 3,870,847 (492,431) 626,521
2/11/2026
36 FY 2026-27 BUDGET

BEGINNING AND ENDING CASH SUMMARY
Section Title: Sonoma Aqueduct Capital Fund
Fund/Department No: 44240 33045200
Actual Estimated Adopted Requested Percent
Account Title 2024-2025 2025-2026 2025-2026 2026-27 Difference Change BEGINNING FUND BALANCE 208,414 265,572 436,845

REVENUES

USE OF MONEY / PROPERTY
44002 Interest on Pooled Cash 7,609 7,862 7,862 15,435 7,572 96.31% SUBTOTAL 7,609 7,862 7,862 15,435 7,572 96.31%

OTHER FINANCING SOURCES
47101 Transfers In - within a Fund 267,447 213,191 213,191 139,950 (73,241) (34.35%) SUBTOTAL 267,447 213,191 213,191 139,950 (73,241) (34.35%) TOTAL REVENUES 275,056 221,053 221,053 155,384 (65,669) (29.71%)

EXPENDITURES

FIXED ASSETS
19832 CIP - Infrastructure 163,367 49,780 0 50,220 50,220 N/A SUBTOTAL 163,367 49,780 0 50,220 50,220 N/A

OTHER FINANCING USES
57011 Transfers Out - within a Fund 0 0 0 0 0 N/A
SUBTOTAL 0 0 0 0 0 N/A
TOTAL EXPENDITURES 163,367 49,780 0 50,220 50,220 N/A
Adjustments to Reserves/Encumbrances:

Outstanding Encumbrances - Net Change (54,531) 0 0
ENDING FUND BALANCE 265,572 436,845 542,009
2/11/2026
37 FY 2026-27 BUDGET

BEGINNING AND ENDING CASH SUMMARY
Section Title: Storage Facilities
Fund/Department No: 44250 33043000
Actual Estimated Adopted Requested Percent
Account Title 2024-2025 2025-2026 2025-2026 2026-27 Difference Change BEGINNING FUND BALANCE 2,390,075 2,050,152 11,675

REVENUES

USE OF MONEY / PROPERTY
44002 Interest on Pooled Cash 87,288 12,054 12,054 4,540 (7,514) (62.34%) SUBTOTAL 87,288 12,054 12,054 4,540 (7,514) (62.34%)

OTHER FINANCING SOURCES
47101 Transfers In - within a Fund 1,280,000 1,570,000 1,570,000 2,890,000 1,320,000 84.08% 47102 Transfers In - btw Govtl Funds 0 0 0 0 0 N/A
SUBTOTAL 1,280,000 1,570,000 1,570,000 2,890,000 1,320,000 84.08% TOTAL REVENUES 1,367,288 1,582,054 1,582,054 2,894,540 1,312,486 82.96%

EXPENDITURES

FIXED ASSETS
19832 CIP - Infrastructure 427,059 3,620,531 2,104,967 2,615,236 510,269 24.24% 19841 Acq-WIP-Intangibles 29,416 0 0 0 0 N/A
SUBTOTAL 456,475 3,620,531 2,104,967 2,615,236 510,269 24.24%

OTHER FINANCING USES
57011 Transfers Out - within a Fund 0 0 0 0 0 N/A
SUBTOTAL 0 0 0 0 0 N/A
TOTAL EXPENDITURES 456,475 3,620,531 2,104,967 2,615,236 510,269 24.24% Adjustments to Reserves/Encumbrances:

Change in Encumbrances (1,250,737) 0 0
Rounding 1 0 0
ENDING FUND BALANCE 2,050,152 11,675 290,979
2/11/2026
38 FY 2026-27 BUDGET

BEGINNING AND ENDING CASH SUMMARY
Section Title: Common Facilities
Fund/Department No: 44260 33043200
Actual Estimated Adopted Requested Percent
Account Title 2024-2025 2025-2026 2025-2026 2026-27 Difference Change BEGINNING FUND BALANCE 11,311,997 10,420,078 509,093

REVENUES

USE OF MONEY / PROPERTY
44002 Interest on Pooled Cash 536,736 54,913 54,913 38,818 (16,095) (29.31%) SUBTOTAL 536,736 54,913 54,913 38,818 (16,095) (29.31%)

MISCELLANEOUS REVENUES
46022 Capital Grants - State 3,174,592 0 0 0 0 N/A
46040 Miscellaneous Revenue 0 0 0 300,000 300,000 N/A
SUBTOTAL 3,174,592 0 0 300,000 300,000 N/A

OTHER FINANCING SOURCES
47101 Transfers In - within a Fund 5,293,000 10,100,000 10,100,000 8,145,000 (1,955,000) (19.36%) 47102 Transfers In - btw Govtl Funds 0 0 0 0 0 N/A
SUBTOTAL 5,293,000 10,100,000 10,100,000 8,145,000 (1,955,000) (19.36%) TOTAL REVENUES 9,004,327 10,154,913 10,154,913 8,483,818 (1,671,095) (16.46%)

EXPENDITURES

FIXED ASSETS
19812 Acq-CIP-Land (6) 0 0 0 0 N/A
19832 CIP - Infrastructure 6,660,119 20,065,897 12,926,099 7,689,014 (5,237,085) (40.52%) 19841 Work in Progress - Intang 89,958 0 0 0 0 N/A
SUBTOTAL 6,750,071 20,065,897 12,926,099 7,689,014 (5,237,085) (40.52%)

OTHER FINANCING USES
57011 Transfers Out - within a Fund 0 0 0 0 0 N/A
SUBTOTAL 0 0 0 0 0 N/A

ADMINISTRATIVE CONTROL ACCOUNT
SUBTOTAL 0 0 0 0 0 N/A
TOTAL EXPENDITURES 6,750,071 20,065,897 12,926,099 7,689,014 (5,237,085) (40.52%) Adjustments to Reserves/Encumbrances:

Outstanding Encumbrances - Net Change (2,932,889) 0 0
Post Audit Adjustment (213,287) 0 0
Rounding 1 (1) 0
ENDING FUND BALANCE 10,420,078 509,093 1,303,898
2/11/2026
39 FY 2026-27 BUDGET

BEGINNING AND ENDING CASH SUMMARY
Section Title: North Marin Water Deposit
Fund/Department No: 44300 33045300
Actual Estimated Adopted Requested Percent
Account Title 2024-2025 2025-2026 2025-2026 2026-27 Difference Change BEGINNING FUND BALANCE 29,711 31,045 31,980

REVENUES

USE OF MONEY / PROPERTY
44002 Interest on Pooled Cash 1,334 934 934 974 40 4.23% SUBTOTAL 1,334 934 934 974 40 4.23%

INTERGOVERNMENTAL REVENUE
42610 Other Governmental Agencie 52,545 0 0 0 0 N/A
SUBTOTAL 52,545 0 0 0 0 N/A

OTHER FINANCING SOURCES
47101 Transfers In - within a Fund 0 0 0 0 0 N/A
SUBTOTAL 0 0 0 0 0 N/A
TOTAL REVENUES 53,879 934 934 974 40 4.23%

EXPENDITURES

OTHER FINANCING USES
57011 Transfers Out - within a Fund 0 0 0 0 0 N/A
SUBTOTAL 0 0 0 0 0 N/A
TOTAL EXPENDITURES 0 0 0 0 0 N/A
Adjustments to Reserves/Encumbrances:

Post Audit Adjustment (52,545) 0
ENDING FUND BALANCE 31,045 31,980 32,954
2/11/2026
40 FY 2026-27 BUDGET

BEGINNING AND ENDING CASH SUMMARY
Section Title: State Loan Debt Service Fund
Fund/Department No: 44265 33047000
Actual Estimated Adopted Requested Percent
Account Title 2024-2025 2025-2026 2025-2026 2026-27 Difference Change BEGINNING FUND BALANCE $524,916 $163,762 $22,448

REVENUES

USE OF MONEY / PROPERTY
44002 Interest on Pooled Cash 53,904 2,651 2,651 1,537 (1,114) (42.02%) SUBTOTAL 53,904 2,651 2,651 1,537 (1,114) (42.02%)

OTHER FINANCING SOURCES
47101 Transfers In - within a Fund 1,196,267 1,196,269 1,196,269 1,196,269 0 0.00% SUBTOTAL 1,196,267 1,196,269 1,196,269 1,196,269 0 0.00% TOTAL REVENUES 1,250,171 1,198,920 1,198,920 1,197,806 (1,114) (0.09%)

EXPENDITURES

OTHER CHARGES
53103 Interest on LT Debt 102,759 76,390 76,390 49,278 (27,112) (35.49%) SUBTOTAL 102,759 76,390 76,390 49,278 (27,112) (35.49%)

OTHER FINANCING USES
57011 Transfers Out - within a Fund 558,000 300,000 300,000 100,000 (200,000) (66.67%) SUBTOTAL 558,000 300,000 300,000 100,000 (200,000) (66.67%) ADMIN. CONTROL ACCOUNT
59002 Advances 937,473 963,844 963,844 990,956 27,112 2.81% 59003 Advances Clearing (937,473) (963,844) (963,844) (990,956) (27,112) 2.81% SUBTOTAL 0 0 0 0 0 N/A
TOTAL EXPENDITURES 660,759 376,390 376,390 149,278 (227,112) (60.34%) Adjustments to Reserves/Encumbrances:

Principal payments on loan (950,567) 0
(Increase) / Decrease in Principal Payable 0 (963,844) (990,956) Unrealized Gain/ Loss (GASB 31) 1 0 0
ENDING FUND BALANCE $163,762 $22,448 $80,021
2/11/2026
41 FY 2026-27 BUDGET

BEGINNING AND ENDING CASH SUMMARY
Section Title: State Loan Reserve Fund
Fund/Department No: 44270 33047100
Actual Estimated Adopted Requested Percent
Account Title 2024-2025 2025-2026 2025-2026 2026-27 Difference Change BEGINNING FUND BALANCE $1,314,661 $1,314,661 $1,314,661

REVENUES

USE OF MONEY / PROPERTY
44002 Interest on Pooled Cash 0 0 0 39,440 39,440 N/A
SUBTOTAL 0 0 0 39,440 39,440 N/A

OTHER FINANCING SOURCES
47101 Transfers In - within a Fund 0 0 0 0 0 N/A
SUBTOTAL 0 0 0 0 0 N/A
TOTAL REVENUES 0 0 0 39,440 39,440 N/A

EXPENDITURES

OTHER FINANCING USES
57011 Transfers Out - within a Fund 0 0 0 0 0 N/A
SUBTOTAL 0 0 0 0 0 N/A
TOTAL EXPENDITURES 0 0 0 0 0 N/A
Adjustments to Reserves/Encumbrances:

Increase in Reserve 0 0 (39,440)
ENDING FUND BALANCE $1,314,661 $1,314,661 $1,314,661
2/11/2026
42 FY 2026-27 BUDGET

BEGINNING AND ENDING CASH SUMMARY
Section Title: Storage Facilities Revenue Bonds 2015
Fund/Department No: 44290 33047500
Actual Estimated Adopted Requested Percent
Account Title 2024-2025 2025-2026 2025-2026 2026-27 Difference Change BEGINNING FUND BALANCE $8,666 $50,957 $48,140

REVENUES

USE OF MONEY / PROPERTY
44002 Interest on Pooled Cash 2,298 594 594 1,413 819 137.87% 44003 Other Interest Earnings 21,438 0 0 0 0 N/A
SUBTOTAL 23,735 594 594 1,413 819 137.87%

OTHER FINANCING SOURCES
47101 Transfers In - within a Fund 476,950 471,733 471,733 471,372 (361) (0.08%) 47102 Transfers In - btw Govtl Funds 0 0 0 0 0 N/A
SUBTOTAL 476,950 471,733 471,733 471,372 (361) (0.08%)
TOTAL REVENUES 500,685 472,328 472,328 472,786 458 0.10%

EXPENDITURES

SERVICES AND SUPPLIES
51242 Bank Charges 1,182 1,500 1,500 1,500 0 0.00%
SUBTOTAL 1,182 1,500 1,500 1,500 0 0.00%

OTHER CHARGES
53103 Interest on LT Debt 131,327 117,500 117,500 111,062 (6,438) (5.48%) 53104 Other Interest Expense (11,468) 5,058 5,058 5,058 0 0.00% SUBTOTAL 119,859 122,558 122,558 116,120 (6,438) (5.25%)

OTHER FINANCING USES
57011 Transfers Out - within a Fund 55,000 70,000 70,000 70,000 0 0.00% 57012 Transfers Out - btw Govtl Fund 0 0 0 0 0 N/A
SUBTOTAL 55,000 70,000 70,000 70,000 0 0.00%
ADMIN. CONTROL ACCOUNT
59004 Administrative Control Account 276,541 286,145 286,145 292,268 6,123 2.14% 59005 Admin Control Acct Clearing (276,541) (286,145) (286,145) (292,268) (6,123) 2.14% SUBTOTAL 0 0 0 0 0 N/A
TOTAL EXPENDITURES 176,041 194,058 194,058 187,620 (6,438) (3.32%) Adjustments to Reserves/Encumbrances:

Loss on Refunding of Debt 5,058 5,058 5,058
Principal Payment (276,541) (286,145) (292,268)
Amortization of Bond Premium (16,526) 0 0
Change in Reserved Fund Balance 5,656
ENDING FUND BALANCE $50,957 $48,140 $46,095
2/11/2026
43 FY 2026-27 BUDGET

BEGINNING AND ENDING CASH SUMMARY
Section Title: Common Facilities Revenue Bonds 2015
Fund/Department No: 44295 33047600
Actual Estimated Adopted Requested Percent
Account Title 2024-2025 2025-2026 2025-2026 2026-27 Difference Change BEG. FUND BALANCE $159,769 $129,475 $94,376

REVENUES

USE OF MONEY / PROPERTY
44002 Interest on Pooled Cash 10,694 1,510 1,510 4,444 2,934 194.31% 44003 Other Interest Earnings 42,616 0 0 0 0 N/A
44050 Unrealized Gains and Losses 0 0 0 0 0 N/A
SUBTOTAL 53,310 1,510 1,510 4,444 2,934 194.31%

OTHER FINANCING SOURCES
47101 Transfers In - within a Fund 1,228,157 1,218,046 1,218,046 1,215,632 (2,414) (0.20%) 47102 Transfers In - btw Govtl Funds 0 0 0 0 0 N/A
SUBTOTAL 1,228,157 1,218,046 1,218,046 1,215,632 (2,414) (0.20%) TOTAL REVENUES 1,281,467 1,219,556 1,219,556 1,220,076 520 0.04%

EXPENDITURES

SERVICES AND SUPPLIES
51242 Bank Charges 2,062 2,500 2,500 2,500 0 0.00%
SUBTOTAL 2,062 2,500 2,500 2,500 0 0.00%

OTHER CHARGES
53103 Interest on LT Debt 392,175 358,736 358,736 343,135 (15,601) (4.35%) 53104 Other Interest Expense (25,008) 4,516 4,516 4,516 0 0.00% 53105 Costs of Issuance 0 0 0 0 0 N/A
53109 Capitalized Interest 0 0 0 0 0 N/A
SUBTOTAL 367,167 363,252 363,252 347,651 (15,601) (4.29%)

OTHER FINANCING USES
57011 Transfers Out - within a Fund 260,000 200,000 200,000 15,000 (185,000) (92.50%) 57012 Transfers Out - btw Govtl Fund 0 0 0 0 0 N/A
SUBTOTAL 260,000 200,000 200,000 15,000 (185,000) (92.50%) ADMIN. CONTROL ACCOUNT
59004 Administrative Control Account 668,772 693,418 693,418 706,920 13,502 1.95% 59005 Admin Control Acct Clearing (668,772) (693,418) (693,418) (706,920) (13,502) 1.95% SUBTOTAL 0 0 0 0 0 N/A
TOTAL EXPENDITURES 629,229 565,752 565,752 365,151 (200,601) (35.46%) Adjustments to Reserves/Encumbrances:

Principal Payment (668,772) (693,418) (706,920)
Change in Principal due to Bond Realloca 0 0 0
Change in Bond Premium due to Bond Re 0 0 0
Revenue Bonds Pay - Change in Current 0 0 0
Amortization of Bond Premium (29,523) 0 0
Capitalized Interest 0
Change in Reserved Fund Balance 11,247
Loss on Refunding Debt 4,515 4,515 4,515
Unrealized Gain/ Loss (GASB 31) 0 0 0
Rounding 0 0 0
ENDING FUND BALANCE $129,475 $94,376 $246,895
2/11/2026
44 FY 2026-27 BUDGET

BEGINNING AND ENDING CASH SUMMARY
Section Title: Sonoma Aqueduct Revenue Bonds 2015
Fund/Department No: 44305 33047700
Actual Estimated Adopted Requested Percent
Account Title 2024-2025 2025-2026 2025-2026 2026-27 Difference Change BEGINNING FUND BALANCE $5,855 $7,784 $7,883

REVENUES

USE OF MONEY / PROPERTY
44002 Interest on Pooled Cash 364 182 182 315 133 73.42% 44003 Other Interest Earnings 1,302 0 0 0 0 N/A
SUBTOTAL 1,666 182 182 315 133 73.42%

OTHER FINANCING SOURCES
47101 Transfers In - within a Fund 37,791 37,702 37,702 37,604 (98) (0.26%) 47102 Transfers In - btw Govtl Funds 0 0 0 0 0 N/A
SUBTOTAL 37,791 37,702 37,702 37,604 (98) (0.26%)
TOTAL REVENUES 39,457 37,883 37,883 37,919 36 0.09%

EXPENDITURES

SERVICES AND SUPPLIES
51242 Bank Charges 355 500 500 500 0 0.00%
SUBTOTAL 355 500 500 500 0 0.00%

OTHER CHARGES
53103 Interest on LT Debt 12,830 11,846 11,846 11,386 (460) (3.88%) 53104 Other Interest Expense (689) 0 0 0 0 N/A
SUBTOTAL 12,140 11,846 11,846 11,386 (460) (3.88%)

OTHER FINANCING USES
57011 Transfers Out - within a Fund 5,000 5,000 5,000 0 (5,000) (100.00%) SUBTOTAL 5,000 5,000 5,000 0 (5,000) (100.00%)
ADMIN. CONTROL ACCOUNT
59004 Administrative Control Account 19,688 20,438 20,438 20,813 375 1.83% 59005 Admin Control Acct Clearing (19,688) (20,438) (20,438) (20,813) (375) 1.83% SUBTOTAL 0 0 0 0 0 N/A
TOTAL EXPENDITURES 17,496 17,346 17,346 11,886 (5,460) (31.48%) Adjustments to Reserves/Encumbrances:

Accrual of Principal Payment - Revenue Bond (19,688) (20,438) (20,813) Amortization of Bond Premium (689) 0 0
Change in Reserved Fund Balance 344
ENDING FUND BALANCE $7,784 $7,883 $13,103
2/11/2026
45 FY 2026-27 BUDGET

BEGINNING AND ENDING CASH SUMMARY
Section Title: Common Facilities Revenue Bonds 2019
Fund/Department No: 44310 33047800
Actual Estimated Adopted Requested Percent
Account Title 2024-2025 2025-2026 2025-2026 2026-27 Difference Change BEG. FUND BALANCE $737,241 $56,540 $46,113

REVENUES

USE OF MONEY / PROPERTY
44002 Interest on Pooled Cash 30,536 993 993 2,604 1,612 162.29% 44003 Other Interest Earnings 239 0 0 0 0 N/A
SUBTOTAL 30,775 993 993 2,604 1,612 162.29%

OTHER FINANCING SOURCES
47101 Transfers In - within a Fund 676,356 679,114 679,114 680,813 1,699 0.25% 47102 Transfers In - btw Govtl Funds 0 0 0 0 0 N/A
SUBTOTAL 676,356 679,114 679,114 680,813 1,699 0.25%
TOTAL REVENUES 707,131 680,107 680,107 683,417 3,310 0.49%

EXPENDITURES

SERVICES AND SUPPLIES
51242 Bank Charges 2,697 3,000 3,000 3,000 0 0.00%
SUBTOTAL 2,697 3,000 3,000 3,000 0 0.00%

OTHER CHARGES
53103 Interest on LT Debt 264,038 247,983 247,983 231,006 (16,977) (6.85%) 53104 Other Interest Expense (54,724) 0 0 0 0 N/A
SUBTOTAL 209,314 247,983 247,983 231,006 (16,977) (6.85%)

OTHER FINANCING USES
57011 Transfers Out - within a Fund 800,000 100,000 100,000 15,000 (85,000) (85.00%) 57012 Transfers Out - btw Govtl Fund 0 0 0 0 0 N/A
SUBTOTAL 800,000 100,000 100,000 15,000 (85,000) (85.00%) ADMIN. CONTROL ACCOUNT
59004 Administrative Control Account 321,097 339,551 339,551 358,005 18,454 5.43% 59005 Admin Control Acct Clearing (321,097) (339,551) (339,551) (358,005) (18,454) 5.43% SUBTOTAL 0 0 0 0 0 N/A
TOTAL EXPENDITURES 1,012,011 350,983 350,983 249,006 (101,977) (29.05%) Adjustments to Reserves/Encumbrances:

Principal Payment (321,097) (339,551) (358,005)
Amortization of Bond Premium (54,724) 0 0
Changed in Reserved Fund Balance 1 0 0
Rounding (1) 0 0
ENDING FUND BALANCE $56,540 $46,113 $122,519
2/11/2026
46 FY 2026-27 BUDGET

BEGINNING AND ENDING CASH SUMMARY
Section Title: Sonoma Aqueduct Revenue Bonds 2019
Fund/Department No: 44315 33047900
Actual Estimated Adopted Requested Percent
Account Title 2024-2025 2025-2026 2025-2026 2026-27 Difference Change BEGINNING FUND BALANCE $164,494 $113,253 $57,268

REVENUES

USE OF MONEY / PROPERTY
44002 Interest on Pooled Cash 7,065 2,528 2,528 1,844 (683) (27.04%) 44003 Other Interest Earnings 85 0 0 0 0 N/A
SUBTOTAL 7,150 2,528 2,528 1,844 (683) (27.04%)

OTHER FINANCING SOURCES
47101 Transfers In - within a Fund 240,426 241,406 241,406 242,008 602 0.25% 47102 Transfers In - btw Govtl Funds 0 0 0 0 0 N/A
SUBTOTAL 240,426 241,406 241,406 242,008 602 0.25%
TOTAL REVENUES 247,576 243,933 243,933 243,852 (81) (0.03%)

EXPENDITURES

SERVICES AND SUPPLIES
51242 Bank Charges 1,252 1,500 1,500 1,500 0 0.00%
SUBTOTAL 1,252 1,500 1,500 1,500 0 0.00%

OTHER CHARGES
53103 Interest on LT Debt 93,662 87,968 87,968 81,945 (6,023) (6.85%) 53104 Other Interest Expense (19,412) 0 0 0 0 N/A
SUBTOTAL 74,250 87,968 87,968 81,945 (6,023) (6.85%)

OTHER FINANCING USES
57011 Transfers Out - within a Fund 90,000 90,000 90,000 25,000 (65,000) (72.22%) SUBTOTAL 90,000 90,000 90,000 25,000 (65,000) (72.22%)
ADMIN. CONTROL ACCOUNT
59004 Administrative Control Account 113,903 120,450 120,450 126,996 6,546 5.43% 59005 Admin Control Acct Clearing (113,903) (120,450) (120,450) (126,996) (6,546) 5.43% SUBTOTAL 0 0 0 0 0 N/A
TOTAL EXPENDITURES 165,502 179,468 179,468 108,445 (71,023) (39.57%) Adjustments to Reserves/Encumbrances:

Accrual of Principal Payment - Revenue Bo (113,903) (120,450) (126,996) Amortization of Bond Premium (19,412) 0 0
Rounding 0 (1) 0
ENDING FUND BALANCE $113,253 $57,268 $65,679
2/11/2026
47 FY 2026-27 BUDGET

BEGINNING AND ENDING CASH SUMMARY
Section Title: Storage Facilities Revenue Bonds 2022
Fund/Department No: 44325 33048100
Actual Estimated Adopted Requested Percent
Account Title 2024-2025 2025-2026 2025-2026 2026-27 Difference Change BEG. FUND BALANCE $9,731 $54,488 $15,533

REVENUES

USE OF MONEY / PROPERTY
44002 Interest on Pooled Cash 2,762 1,299 1,299 1,049 (249) (19.20%) 44003 Other Interest Earnings 110,867 0 0 0 0 N/A
SUBTOTAL 113,629 1,299 1,299 1,049 (249) (19.20%)

MISCELLANEOUS REVENUES
46200 PY Revenue - Miscellaneous (112,082) 0 0 0 0 N/A
SUBTOTAL (112,082) 0 0 0 0 N/A
OTHER FINANCING SOURCES (112,082)
47101 Transfers In - within a Fund 442,662 458,050 458,050 443,417 (14,633) (3.19%) 47102 Transfers In - btw Govtl Funds 0 0 0 0 0 N/A
SUBTOTAL 442,662 458,050 458,050 443,417 (14,633) (3.19%) TOTAL REVENUES 444,209 459,348 459,348 444,466 (14,882) (3.24%)

EXPENDITURES

SERVICES AND SUPPLIES
51242 Bank Charges 590 1,000 1,000 1,000 0 0.00%
SUBTOTAL 590 1,000 1,000 1,000 0 0.00%

OTHER CHARGES
53103 Interest on LT Debt 158,354 154,190 154,190 135,142 (19,048) (12.35%) 53104 Other Interest Expense (36,700) 0 0 0 0 N/A
SUBTOTAL 121,654 154,190 154,190 135,142 (19,048) (12.35%)

OTHER FINANCING USES
57011 Transfers Out - within a Fund 1,225,000 100,000 100,000 20,000 (80,000) (80.00%) 57012 Transfers Out - btw Govtl Fund 0 0 0 0 0 N/A
SUBTOTAL 1,225,000 100,000 100,000 20,000 (80,000) (80.00%) ADMIN. CONTROL ACCOUNT
59004 Administrative Control Account 225,570 243,114 243,114 249,438 6,324 2.60% 59005 Admin Control Acct Clearing (225,570) (243,114) (243,114) (249,438) (6,324) 2.60% SUBTOTAL 0 0 0 0 0 N/A
TOTAL EXPENDITURES 1,347,244 255,190 255,190 156,142 (99,048) (38.81%) Adjustments to Reserves/Encumbrances:

Gain on Refunding (4,913) 0 0
Amortization of Bond Premium 61,606
Proceeds from Bond Issuance 1,116,667 0 0
Accrual of Principal Payment - Revenue Bon (225,570) (243,114) (249,438) Rounding 1 1 0
ENDING FUND BALANCE $54,488 $15,533 $54,419
2/11/2026
48 FY 2026-27 BUDGET

BEGINNING AND ENDING CASH SUMMARY
Section Title: Common Facilities Revenue Bonds 2022
Fund/Department No: 44335 33048300
Actual Estimated Adopted Requested Percent
Account Title 2024-2025 2025-2026 2025-2026 2026-27 Difference Change BEG. FUND BALANCE $5,576,812 $1,083,870 $1,187,946

REVENUES

USE OF MONEY / PROPERTY
44002 Interest on Pooled Cash 221,905 36,826 36,826 37,994 1,168 3.17% 44003 Other Interest Earnings (110,597) 0 0 0 0 N/A
SUBTOTAL 111,308 36,826 36,826 37,994 1,168 3.17%

MISCELLANEOUS REVENUES
46200 PY Revenue - Miscellaneous 112,082 0 0 0 0 N/A
SUBTOTAL 112,082 0 0 0 0 N/A

OTHER FINANCING SOURCES
47101 Transfers In - within a Fund 1,293,866 1,282,250 1,282,250 1,295,822 13,572 1.06% 47102 Transfers In - btw Govtl Funds 0 0 0 0 0 N/A
SUBTOTAL 1,293,866 1,282,250 1,282,250 1,295,822 13,572 1.06% TOTAL REVENUES 1,517,256 1,319,076 1,319,076 1,333,816 14,740 1.12%

EXPENDITURES

SERVICES AND SUPPLIES
51242 Bank Charges 3,036 3,000 3,000 3,300 300 10.00%
SUBTOTAL 3,036 3,000 3,000 3,300 300 10.00%

OTHER CHARGES
53103 Interest on LT Debt 591,858 558,233 558,233 537,438 (20,795) (3.73%) 53104 Other Interest Expense (82,573) 0 0 0 0 N/A
SUBTOTAL 509,285 558,233 558,233 537,438 (20,795) (3.73%)

OTHER FINANCING USES
57011 Transfers Out - within a Fund 3,675,000 100,000 100,000 15,000 (85,000) (85.00%) 57012 Transfers Out - btw Govtl Fund 0 0 0 0 0 N/A
SUBTOTAL 3,675,000 100,000 100,000 15,000 (85,000) (85.00%) ADMIN. CONTROL ACCOUNT
59004 Administrative Control Account 530,243 553,767 553,767 586,063 32,296 5.83% 59005 Admin Control Acct Clearing (530,243) (553,767) (553,767) (586,063) (32,296) 5.83% SUBTOTAL 0 0 0 0 0 N/A
TOTAL EXPENDITURES 4,187,322 661,233 661,233 555,738 (105,495) (15.95%) Adjustments to Reserves/Encumbrances:

Gain on Refunding (6,879) 0 0
Accrual of Principal Payment - Revenue Bon (530,243) (553,767) (586,063) Amortization of Bond Premium (169,088) 0 0
Change in Principal due to Refunding of Deb (1,116,667) 0 0 Rounding 1 0 0
ENDING FUND BALANCE $1,083,870 $1,187,946 $1,379,961
2/11/2026
49 FY 2026-27 BUDGET

BEGINNING AND ENDING CASH SUMMARY
Section Title: Sonoma Aqueduct Revenue Bonds 2022
Fund/Department No: 44330 33048200
Actual Estimated Adopted Requested Percent
Account Title 2024-2025 2025-2026 2025-2026 2026-27 Difference Change BEGINNING FUND BALANCE $36,820 $69,738 $103,119

REVENUES

USE OF MONEY / PROPERTY
44002 Interest on Pooled Cash 2,320 2,571 2,571 3,607 1,036 40.29% 44003 Other Interest Earnings 21 0 0 0 0 N/A
SUBTOTAL 2,341 2,571 2,571 3,607 1,036 40.29%

MISCELLANEOUS REVENUES
SUBTOTAL 0 0 0 0 0 N/A

OTHER FINANCING SOURCES
47101 Transfers In - within a Fund 233,940 236,208 236,208 234,741 (1,466) (0.62%) 47102 Transfers In - btw Govtl Funds 0 0 0 0 0 N/A
SUBTOTAL 233,940 236,208 236,208 234,741 (1,466) (0.62%) TOTAL REVENUES 236,281 238,779 238,779 238,348 (431) (0.18%)

EXPENDITURES

SERVICES AND SUPPLIES
51242 Bank Charges 288 600 600 600 0 0.00%
SUBTOTAL 288 600 600 600 0 0.00%

OTHER CHARGES
53103 Interest on LT Debt 58,887 51,678 51,678 44,022 (7,656) (14.81%) 53104 Other Interest Expense (24,172) 0 0 0 0 N/A
SUBTOTAL 34,715 51,678 51,678 44,022 (7,656) (14.81%)

OTHER FINANCING USES
57011 Transfers Out - within a Fund 0 0 0 0 0 N/A
SUBTOTAL 0 0 0 0 0 N/A
ADMIN. CONTROL ACCOUNT
59004 Administrative Control Account 144,188 153,120 153,120 159,500 6,380 4.17% 59005 Admin Control Acct Clearing (144,188) (153,120) (153,120) (159,500) (6,380) 4.17% SUBTOTAL 0 0 0 0 0 N/A
TOTAL EXPENDITURES 35,003 52,278 52,278 44,622 (7,656) (14.64%) Adjustments to Reserves/Encumbrances:

Gain on Refunding (4,040) 0 0
Accrual of Principal Payment - Revenue Bo (144,188) (153,120) (159,500) Amortization of Bond Premium (20,132) 0 0
ENDING FUND BALANCE $69,738 $103,119 $137,345
2/11/2026
50 FY 2026-27 BUDGET

BEGINNING AND ENDING CASH SUMMARY
Section Title: Petaluma Aqueduct Revenue Bonds Fund 2026 Fund/Department No: 44285 33047400
Actual Estimated Adopted Requested Percent
Account Title 2024-2025 2025-2026 2025-2026 2026-27 Difference Change BEGINNING FUND BALANCE $0 $0 $2,142,608

REVENUES

USE OF MONEY / PROPERTY
44002 Interest on Pooled Cash 0 33,851 33,851 45,512 11,661 34.45% SUBTOTAL 0 33,851 33,851 45,512 11,661 34.45%

OTHER FINANCING SOURCES
47101 Transfers In - within a Fund 0 346,697 346,697 303,790 (42,907) (12.38%) 47102 Transfers In - btw Govtl Funds 0 0 0 0 0 N/A
SUBTOTAL 0 346,697 346,697 303,790 (42,907) (12.38%)

SPECIAL ITEMS
48004 Transfers In - within a Fund 0 0 0 0 0 N/A
SUBTOTAL 0 0 0 0 0 N/A
TOTAL REVENUES 0 380,548 380,548 349,303 (31,245) (8.21%)

EXPENDITURES

SERVICES AND SUPPLIES
51242 Bank Charges 0 480 480 480 0 0.00%
SUBTOTAL 0 480 480 480 0 0.00%

OTHER CHARGES
53103 Interest on LT Debt 0 149,872 149,872 149,872 0 0.00% 53104 Other Interest Expense 0 0 0 0 0 N/A
53105 Costs of Issuance 0 37,310 37,310 0 (37,310) (100.00%) 53109 Capitalized Interest 0 0 0 0 0 N/A
SUBTOTAL 0 187,182 187,182 149,872 (37,310) (19.93%)

OTHER CHARGES
SUBTOTAL 0 0 0 0 0 N/A

OTHER FINANCING USES
57011 Transfers Out - within a Fund 0 1,450,000 1,450,000 1,450,000 0 0.00% SUBTOTAL 0 1,450,000 1,450,000 1,450,000 0 0.00%
ADMIN. CONTROL ACCOUNT
59004 Administrative Control Account 0 113,814 113,814 113,814 0 0.00% 59005 Admin Control Acct Clearing 0 (113,814) (113,814) (113,814) 0 0.00% SUBTOTAL 0 0 0 0 0 N/A
TOTAL EXPENDITURES 0 1,637,662 1,637,662 1,600,352 (37,310) (2.28%) Adjustments to Reserves/Encumbrances:
(Increase)/Decrease in Bonds Payable
Proceeds from issuance 0 3,513,536 0
Principal Payments on Bonds 0 (113,814) 0
Rounding 0 (1) 0
ENDING FUND BALANCE $0 $2,142,608 $891,559
2/11/2026
51 FY 2026-27 BUDGET

BEGINNING AND ENDING CASH SUMMARY
Section Title: Storage Facilities Revenue Bond - 2026
Fund/Department No: 44280 33047300
Actual Estimated Adopted Requested Percent
Account Title 2024-2025 2025-2026 2025-2026 2026-27 Difference Change BEGINNING FUND BALANCE $0 $0 $4,597,502

REVENUES

USE OF MONEY / PROPERTY
44002 Interest on Pooled Cash 0 71,805 71,805 98,391 26,585 37.02% SUBTOTAL 0 71,805 71,805 98,391 26,585 37.02%

OTHER FINANCING SOURCES
47101 Transfers In - within a Fund 0 577,285 577,285 505,842 (71,444) (12.38%) 47102 Transfers In - btw Govtl Funds 0 0 0 0 0 N/A
SUBTOTAL 0 577,285 577,285 505,842 (71,444) (12.38%)

SPECIAL ITEMS
48004 Transfers In - within a Fund 0 0 0 0 0 N/A
SUBTOTAL 0 0 0 0 0 N/A
TOTAL REVENUES 0 649,091 649,091 604,232 (44,859) (6.91%)

EXPENDITURES

SERVICES AND SUPPLIES
51242 Bank Charges 0 799 799 799 0 0.00%
SUBTOTAL 0 799 799 799 0 0.00%

OTHER CHARGES
53103 Interest on LT Debt 0 249,552 249,552 249,552 0 0.00% 53105 Costs of Issuance 0 62,125 62,125 0 (62,125) (100.00%) SUBTOTAL 0 311,677 311,677 249,552 (62,125) (19.93%)

OTHER CHARGES
SUBTOTAL 0 0 0 0 0 N/A

OTHER FINANCING USES
57011 Transfers Out - within a Fund 0 1,400,000 1,400,000 2,800,000 1,400,000 100.00% SUBTOTAL 0 1,400,000 1,400,000 2,800,000 1,400,000 100.00% ADMIN. CONTROL ACCOUNT
59004 Administrative Control Account 0 189,512 189,512 189,512 0 0.00% 59005 Admin Control Acct Clearing 0 (189,512) (189,512) (189,512) 0 0.00% SUBTOTAL 0 0 0 0 0 N/A
TOTAL EXPENDITURES 0 1,712,476 1,712,476 3,050,351 1,337,875 78.13% Adjustments to Reserves/Encumbrances:

Principal payments on bonds 0 (189,512) (189,512)
Proceeds from issuance 0 5,850,400 0
Rounding 0 (1)
ENDING FUND BALANCE $0 $4,597,502 $1,961,872
2/11/2026
52 FY 2026-27 BUDGET

BEGINNING AND ENDING CASH SUMMARY
Section Title: Common Facilities Revenue Bonds - 2026
Fund/Department No: 44275 33047200
Actual Estimated Adopted Requested Percent
Account Title 2024-2025 2025-2026 2025-2026 2026-27 Difference Change BEG. FUND BALANCE $0 $0 $14,731,737

REVENUES

USE OF MONEY / PROPERTY
44002 Interest on Pooled Cash 0 231,977 231,977 327,319 95,342 41.10% SUBTOTAL 0 231,977 231,977 327,319 95,342 41.10%

OTHER FINANCING SOURCES
47101 Transfers In - within a Fund 0 2,328,330 2,328,330 2,040,180 (288,150) (12.38%) 47102 Transfers In - btw Govtl Funds 0 0 0 0 0 N/A
SUBTOTAL 0 2,328,330 2,328,330 2,040,180 (288,150) (12.38%)

SPECIAL ITEMS
48004 Transfers In - within a Fund 0 0 0 0 0 N/A
SUBTOTAL 0 0 0 0 0 N/A
TOTAL REVENUES 0 2,560,307 2,560,307 2,367,499 (192,808) (7.53%)

EXPENDITURES

SERVICES AND SUPPLIES
51242 Bank Charges 0 3,222 3,222 3,222 0 0.00%
SUBTOTAL 0 3,222 3,222 3,222 0 0.00%

OTHER CHARGES
53103 Interest on LT Debt 0 1,006,501 1,006,501 1,006,501 0 0.00% 53104 Other Interest Expense 0 0 0 0 0 N/A
53105 Costs of Issuance 0 250,565 250,565 0 (250,565) (100.00%) SUBTOTAL 0 1,257,066 1,257,066 1,006,501 (250,565) (19.93%)

OTHER CHARGES
SUBTOTAL 0 0 0 0 0 N/A

OTHER FINANCING USES
57011 Transfers Out - within a Fund 0 9,400,000 9,400,000 8,000,000 (1,400,000) (14.89%) SUBTOTAL 0 9,400,000 9,400,000 8,000,000 (1,400,000) (14.89%) ADMIN. CONTROL ACCOUNT
59004 Administrative Control Account 0 764,346 764,346 764,346 0 0.00% 59005 Admin Control Acct Clearing 0 (764,346) (764,346) (764,346) 0 0.00% SUBTOTAL 0 0 0 0 0 N/A
TOTAL EXPENDITURES 0 10,660,288 10,660,288 9,009,723 (1,650,565) (15.48%) Adjustments to Reserves/Encumbrances:

Principal payments on bonds 0 (764,346) 0
Proceeds from issuance 0 23,596,064 0
Rounding 0 1 0
ENDING FUND BALANCE $0 $14,731,737 $8,089,512
2/11/2026
53 A. ANNUAL DEBT SERVICE REQUIREMENTS
Sonoma Petaluma
Common O&M Water Storage Pipeline Pipeline
Facilities Fund Conservation Facilities Facilities Facilities 2026 A Revenue Bond 44275 44280 44285
PRINCIPAL 764,346 N.A N.A 189,512 0 113,814
INTEREST 1,006,501 N.A N.A 249,552 0 149,872
OTHER INTEREST - DEFERRED REFUNDING CHARGE 0 N.A N.A 0 0 0 FISCAL AGENT FEES 3,222 N.A N.A 799 0 480
DEBT ISSUANCE COSTS N.A N.A 0
Total Individual Bond Payments 1,774,070 N.A N.A 439,862 0 264,165 Bond Reserve 266,110 N.A N.A 65,979 0 39,625
Total Individual Bond Debt Service 2,040,180 N.A N.A 505,842 0 303,790 2015A Revenue Bond 44295 44290 44305
PRINCIPAL 706,920 N.A N.A 292,268 20,813 N.A
INTEREST 343,135 N.A N.A 111,062 11,386 N.A
OTHER INTEREST - DEFERRED REFUNDING CHARGE 4,516 N.A N.A 5,058 0 N.A FISCAL AGENT FEES 2,500 N.A N.A 1,500 500 N.A

DEBT ISSUANCE COSTS
Total Individual Bond Payments 1,057,071 N.A N.A 409,888 32,699 N.A Bond Reserve 158,561 N.A N.A 61,484 4,905 N.A
Total Individual Bond Debt Service 1,215,632 N.A N.A 471,372 37,604 N.A 2019A Revenue Bond 44310 44320 44315
PRINCIPAL 358,005 N.A N.A N.A 126,996 N.A
INTEREST 231,006 N.A N.A N.A 81,945 N.A
FISCAL AGENT FEES 3,000 N.A N.A N.A 1,500 N.A

DEBT ISSUANCE COSTS
Total Individual Bond Payments 592,011 N.A N.A N.A 210,441 N.A Bond Reserve 88,802 N.A N.A N.A 31,566 N.A
Total Individual Bond Debt Service 680,813 N.A N.A N.A 242,008 N.A 2022A Revenue Bond 44335 44325 44330
PRINCIPAL 586,063 N.A N.A 249,438 159,500 N.A
INTEREST 537,438 N.A N.A 135,142 44,022 N.A
FISCAL AGENT FEES 3,300 N.A N.A 1,000 600 N.A

DEBT ISSUANCE COSTS
Total Individual Bond Payments 1,126,801 N.A N.A 385,580 204,122 N.A Bond Reserve 169,020 N.A N.A 57,837 30,618 N.A
Total Individual Bond Debt Service 1,295,822 N.A N.A 443,417 234,741 N.A SRF LOAN 44265
PRINCIPAL 990,956 N.A N.A N.A N.A N.A
INTEREST 49,278 N.A N.A N.A N.A N.A
Total Individual Loan Payments 1,040,234 N.A N.A N.A N.A N.A Reserve Requirement 156,035 N.A N.A N.A N.A N.A
Total SRF Debt Service 1,196,269 N.A N.A N.A N.A N.A

SRF LOAN RESERVE
RESERVE N.A N.A N.A N.A N.A
Total SRF Debt Service 1,196,269 N.A N.A N.A N.A N.A
TOTAL DEBT SERVICE $6,428,716 $0 $0 $1,420,631 $514,353 $303,790 757,370
$5,671,346 $0 $0 $1,420,631 $514,353 $303,790
REVENUE BOND / STATE LOAN CHARGES - WATER RATES AND ESTIMATED REVENUES FOR FY26-27 LESS REV. FROM N. MARIN REV. BOND CHARGES

REMAINING REVENUE REQUIREMENT
54 A. ANNUAL DEBT SERVICE REQUIREMENTS
Sonoma Petaluma
Common O&M Water Storage Pipeline Pipeline
Facilities Fund Conservation Facilities Facilities Facilities REVENUE BOND / STATE LOAN CHARGES - WATER RATES AND ESTIMATED REVENUES FOR FY26-27 B. CALCULATIONS OF WATER RATES FOR FY26-27
Sonoma Petaluma
Common O&M Water Storage Pipeline Pipeline
Facilities Fund Conservation Facilities Facilities Facilities Debt Service Debt Service Debt Service Revenue Bonds Revenue Bonds Revenue Bonds Charge Charge Charge Charge Charge Charge
REVENUE REQUIREMENT $5,671,346.06 $0 $0 $1,420,631 $514,353 $303,790 APPLICABLE BASE WATER DELIVERIES IN A.F. 31,015.61 41,717.1 41,717.1 31,015.61 3,089.9 11,027.3 CHARGES PER ACRE-FEET $182.85 $0.00 $0.00 $45.80 $166.46 $27.55 C. CALCULATIONS OF NORTH MARIN REVENUE BONDS CHARGE
$1,941,373
240,524
4,708

51.09 3,797,126
516,845
4,708
109.78
Remaining Facilities: SRF Loan, 2015A Revenue Bond Refunding, 2022A Revenue Bond Refunding Additional Facilities: 2015A Revenue Bond New Money, 2022A Revenue Bond New Money, 2025A Revenue Bond Excluded: 2019A Revenue Bond - NMWD Paid Cash
Principal Interest
Reserve
Requirement
Fiscal Agent Fee
+ Other Charges Total
SRF LOAN 990,956 49,278 156,035 1,196,269
2015A Revenue Bond 693,418 358,736 158,561 7,016 1,217,730 2015A Revenue Bond New Money 478,811 277,513 113,979 5,043 875,346 2015A Revenue Bond Refunding 214,606 81,223 44,582 1,973 342,384 2019A Revenue Bond 358,005 231,006 88,802 3,000 680,813 2022A Revenue Bond 553,767 558,233 169,020 3,300 1,284,319 2022A Revenue Bond New Money 293,067 470,246 116,021 2,265 881,599 2022A Revenue Bond Refunding 260,700 87,986 52,999 1,035 402,720 2026A Revenue Bond 764,346 1,006,501 266,110 3,222 2,040,180 2026A Revenue Bond New Money 764,346 1,006,501 266,110 3,222 2,040,180 N. MARIN'S SHARE (REV. REQMT. FOR COMMON FAC. DEBT SERVICE X (11.2/90.4)) ESTIMATED WATER DELIVERIES TO NORTH MARIN (IN A.F.)

NORTH MARIN REVENUE BONDS CHARGE
REVENUE REQUIREMENT FOR COMMON FACILITIES DEBT SERVICE (Remaining Facilities per RA 4.3a2 ) FY26/27
REVENUE REQUIREMENT FOR COMMON FACILITIES DEBT SERVICE (Additional Facilities per RA 4.3b9 ) N. MARIN'S SHARE (REV. REQMT. FOR COMMON FAC. DEBT SERVICE X (19.9/146.2)) ESTIMATED WATER DELIVERIES TO NORTH MARIN (IN A.F.)

NORTH MARIN REVENUE BONDS CHARGE
55 Fund Index OT Out (57012) To OT In (47101) Fund Bal. (Stmt.) Fund Bal. (Cash) Diff.

Santa Rosa Aq. Capital Fund 44230 0 323,068 11,388,796 11,388,796 (0) Petaluma Aq. Capital Fund 44235 0 1,667,288 626,521 626,521 0 Sonoma Aq. Capital Fund 44240 0 139,950 542,009 542,009 0 Sonoma2012/Petaluma2026 Bonds 44285 1,450,000 Petaluma AQ 303,790 891,559 891,559 0 Sonoma Rev Bond 2015 Fund 44305 0 Sonoma AQ 37,604 13,103 13,103 0 Sonoma Rev Bond 2019 Fund 44315 25,000 Sonoma AQ 242,008 65,679 65,679 0 Sonoma Rev Bond 2022 Fund 44330 0 Sonoma AQ 234,741 137,345 137,345 0 Storage Rev Bond 2026 Fund 44280 2,800,000 Storage Facilities 505,842 1,961,872 1,961,872 0 Storage Rev Bond 2015 Fund 44290 70,000 Storage Facilities 471,372 46,095 46,095 1 Storage Rev Bond 2022 Fund 44325 20,000 Storage Facilities 443,417 54,419 54,419 0 Common Rev Bond 2026 Fund 44275 8,000,000 Common Facilities 2,040,180 8,089,512 8,089,512 0 Common Rev Bond 2015 Fund 44295 15,000 Common Facilities 1,215,632 246,895 246,895 0 Common Rev Bond 2019 Fund 44310 15,000 Common Facilities 680,813 122,519 122,519 0 Common Rev Bond 2022 Fund 44335 15,000 Common Facilities 1,295,822 1,379,961 1,379,961 0 State Loan Debt Service 44265 100,000 Common Facilities 1,196,269 80,021 80,021 0 State Loan Reserve 44270 0 0 1,314,661 1,314,661 0
Capital Lease Financing 0 0 0 0 0
Agency Fund (Discretionary) 44205 0 Common Facilities 0 11,092,455 11,092,455 0 Agency Fund (Charges) 44205 16,432,179 0
Pipeline Facilities 44255 0 0 0 0
Storage Facilities 44250 2,890,000 290,979 290,979 0
Common Facilities 44260 8,145,000 1,303,898 1,303,898 0 North Marin 44300 0 0 32,953 32,954 0
Water Management Planning 44210 110,000 98,873 98,874 0 Watershed Planning/Restoration 44215 3,986,054 958,611 958,611 0 Recycled Water & Local Supply 44220 0 274,219 274,219 0 Water Conservation 44225 3,013,329 56,203 56,203 (0)
Total 28,942,179 28,942,179 41,069,158 41,069,159 1
Common Facilities OT - in 47101 From
Water Transmission (discretionary) -
Water Transmission (Charges) -
North Marin - O&M Rate Computation
2015 Bond Fund 15,000 Revenue Requirement - Transfers Out:
2019 Bond Fund 15,000 16,432,179
2022 Bond Fund 15,000
2025 Bond Fund 8,000,000
State Loan Debt Service 100,000
8,145,000
Agency Fund (Charges) OT - Out To: Agency Fund (Charges) OT - Out To:

AQ Capital Funds Summary
Santa Rosa Aq. Capital Fund 323,068
Petaluma Aq. Capital Fund 217,288 AQ Capital Funds 655,306 Sonoma Aq. Capital Fund 114,950 Debt Service Funds 8,667,490 655,306 WT Subfunds 7,109,383
Debt Service Funds 16,432,179
Sonoma Rev Bond 2015 Fund 37,604
Sonoma Rev Bond 2019 Fund 242,008 Capital Funds and North Marin 0 Sonoma Rev Bond 2022 Fund 234,741
Sonoma2012/Petaluma2026 Bonds 303,790
Storage Rev Bond 2015 Fund 471,372 Total 16,432,179
Storage Rev Bond 2022 Fund 443,417
Storage Rev Bond 2026 Fund 505,842
Common Rev Bond 2015 Fund 1,215,632
Common Rev Bond 2019 Fund 680,813
Common Rev Bond 2026 Fund 2,040,180
Common Rev Bond 2022 Fund 1,295,822
State Loan Debt Service 1,196,269
State Loan Reserve 0
Capital Lease Financing 0
8,667,490
Capital Funds and North Marin
Pipeline Facilities 0
Storage Facilities 0
Common Facilities 0
North Marin 0
0 WT Subfunds
Water Management Planning 110,000
Watershed Planning/Restoration 3,986,054
Recycled Water & Local Supply 0
Water Conservation 3,013,329
7,109,383
Total 16,432,179
FY 2026-27 BUDGET
Water Transmission System - Fund Balances and Operating Transfers 2/11/2026
56

← All documents from this meeting