SCHEDULE OF VALUES
Page | 1
D A T E:
May 1st, 2026
T O: R E F E R E N C E:
City of Cotati La Salle Ave & Lincoln Ave Water Valve Replacement 1 Trebino Ct
Cotati, CA 94931
P R I C I N G:
ITEMS DESCRIPTION: QTY UM UP TOTAL
1 Water Valve Replacement 1 LS $41,680 $41,680
2 ACP Removal 1 LS $3,000 $3,000
TOTAL $44,680
Pricing is based upon the following clarifications and exclusions.
C L A R I F I C A T I O N S:
• BID ITEM 1
a. Excavate, replace, and backfill water valve per City of Cotati Standard Number 126 Type A trench detail.
b. FL x FL valve to be installed with two 8-inch by 1-foot FL x PE spools and tied into existing 8-inch ACP with two 8-inch Hymax couplers.
c. CLII AB section to be 12-inches and remaining backfill to be bedding material. d. Residual water to be dewatered into sanitary sewer system. e. New piping will be swapped and disinfected with liquid chlorine prior to installation. f. Upon installation valve to be put in service and line shall be blown off through the closest fire hydrant by City of Cotati personnel.
P a g e | 2
g. Pave back 3-inch section of asphalt per City of Cotati Standard Number 126 Type A trench detail.
h. Plant opening fee of $2,500 to be credited back if it is not charged. • BID ITEM 2
a. Mobilization of subcontractor to cut, remove, and dispose of section of ACP pipe. Bid item to be removed if City of Cotati will take on this scope.
E X C L U S I O N S:
• Water meters install or furnish.
• Damage to unmarked utilities.
• Compaction testing.
• Engineering, testing, and inspections.
• Pressure testing.
• Bacteria testing.
• All permits and fees.
• Cost of bonds.
• Project SWPPP, SWPPP plan, storm water monitoring, data collection or entering into the SMARTs system.
• Removal or relocation of utilities to remain or in conflict with proposed improvements other than specified.
• Unforeseen/unknown conditions.
C O N T A C T I N F O R M A T I O N
Sean Sullivan
Project Manager, Coastal Region
Cell: (408) 220-3780
[email protected]