Graham Contractors - Change Order Quote

Cotati City Council
October 13, 2026

Document
Graham Contractors - Change Order Quote
Meeting
October 13, 2026
Body
Cotati City Council
Original file
623 KB
Text extracted from the city's file for reading and search. Open the original on cotaticity.primegov.com. That file is the official record.

I N C. EST. 1976
Post Office Box 26770
San Jose, CA 95159 Phone (408) 293-9516 Fax (408) 293-3633 To: Rick Seanor Quote Date:

Firm: Green Valley consulting Engineers Bid Date/Time
Phone: 707-621-1511 City
Fax: Contr. NO
Email:

Job:

ITEM NO. DESCRIPTION UOM QUANTITY UNIT PRICE TOTAL
option 1 Plant Opening SF 186 $138.50 25,761.00 $
option 2 October 8th SF 168 $108.50 18,228.00 $
option 3 Pre Load and Cover SF 168 $92.50 15,540.00 $
Includes:

Price Good October 31, 2026 No. of Days 1 DAY
Thru Each Add'l DAY: $17,500.00
Exclusions: Permits, Fees, Bonds (Bondable @ 1%), Removal of Parked Cars, A/C Patching, Heavy Cleaning/Dirt Removal/Pressure Washing, OCIP/CCIP/WRAP Participation OR Fees, Builder's Risk Insurance, Participation in any Local Hiring / Workforce Agreement of any kind, Terms of Quote: Payment Within 30 Days of substantial completion of our work / NO RETENTION ON PROJECTS UNDER $ 20,001.00

AND CANNOT BE SUPERSEDED BY ANY OTHER TERMS OF THE AGREEMENT SCHEDULING OF ANY WORK BETWEEN NOVEMBER 1 AND MAY 1 IS SUBJECT TO OUR SOLE DISCRETION AND A WEATHER RELEASE MAY BE REQUIRED

PRICE INCLUDES A ONE-YEAR WARRANTY FOR MATERIALS AND WORKMANSHIP BEGINNING ON SUBSTANTIAL COMPLETION OF OUR WORK Accepted
By: Date:

Title:

Mob and Demob of Equipment (Equipment will be delivered with trucks coming to site and leave at end of shift, Grind, Sweep, Tack, Pave and Roll 3" over 168sqft per the attached and provided drawing Traffic Control - Lane Shift, we will grind & pave 1 lane and put traffic in second, once complete we will switch sides and grind & pave 2nd lane + shoulder, We will provide a TCP with standard signage (Road Con Ahead, Rt/Lt Lane Closed Ahead, Rt/Lt Lane Closed, coming from off ramp and East Bound 116. Basic Road Con Ahead on West Bound 116. Arrow boards are not included in pricing but can be added if required. We will close 1 turn lane on off ramp for both sides of 116. We will flip the single lane closed on EB 116 as required. This is a standard lane shift Traffic Plan with no full time flagging. If arrow boards required, we will need additional trucks to get to site ahead of work.

Repair of power steering marks (inherent to materials being used), QA/QC/TESTING, SWPPP/WPCP/BMPs, Sealing of curbs/berms/ditches,

SEE ABOVE
Traffic Police, Tack/Prime Coats, Flood Testing, Leveling Courses, Rut Filling, Security Classes/Badging, Mailings, Saturday & Sunday Work, Night Work, Any and ALL Contractual Share Payments or Agreements, Utility Cover Adjustment, Installation of Posts/Signs, Curb Painting, Bollard Painting, Wheel Stops, Sandblasting or Grinding of any type, Informational Signage of any kind, TOTAL
Crackfilling, Rout/Sawcutting of cracks, Herbicide or Soil Sterilant, Clearing/Grubbing, Vegetation / Tree Trimming, Job-Site Scales, CMS Boards, Railroad or VTA Traffic Control / Insurance / Permits / Classes / Fees of any type, Federal Wages, Fiber or fiberglass additives of any kind, JJ Waiters
CA Lic. # 315789 A, C-12 ------ DIR Reg. # PW-LR-1000898576

GRAHAM CONTRACTORS IS UNION SIGNATORY
Quote Submitted By:

CONDITIONS OF THIS QUOTE, UNLESS AND UNTIL THE PARTIES THEREAFTER SIGN A MUTUALLY ACCEPTABLE WRITTEN AGREEMENT October 6, 2026
2026/2027 Pavement Preservation Project
Cotati
PA#097-2

THIS QUOTATION AND CONDITIONS MUST BECOME PART OF ANY CONTRACT OR PURCHASE ORDER,

IF CONTRACTOR OR OWNER DIRECTS GRAHAM CONTRACTORS TO PROCEED WITH THE WORK SET FORTH ABOVE,

EVEN IF SAID DIRECTION IS ONLY MADE VERBALLY OR ELECTRONICALLY, THEN CONTRACTOR AGREES TO THE TERMS AND Grading/Base Prep/Watering, Formal OR Certified OR Scaled OR Site-Specific Traffic Control Plans, Attenuator Vehicles, Flaggers

G R A H A M

C O N T R A C T O R S
patch on HWY 116
Stripe/Marker Removal, Stripe/Marker Replacement, Stripe/Marker Protection, Temporary Delineation of any type, Job-Specific Calibration,