o Reasonable Relationship (amount of the fee and the facility cost attributable to the development project): the amount of the fee depends on the number of peak hour trips generated by each development category. The fees are based on the estimated number of peak hour trips per unit (residential unit type or per 1,000 SF of nonresidential development), thus, the fee charged to a development project reflects the impact of that project on the need for street improvements and traffic signals in the City.
Tables 2 and 3 below show the existing and proposed Development Impact Fees, respectively. Note that under AB 602, DIF must be charged proportionately to Unit size. As a result, development impact fees are tiered based on unit sizes. Certain impact fees are reduced as a result of the study due to LOS calculations, but all DIF totals are proposed to increase at a minimum of 12%.
Table 2. Existing Development Impact Fee Schedule
Table 3. Proposed Development Impact Fee Schedule
The Development Impact Fee Schedule shall be adjusted annually in July of each calendar year, using the Construction Cost Index (CCI) for the Los Angeles Region as reported by Engineering News Record (ENR) for the twelve-month period ending in May or a similar published index if the CCI Index is no longer available. The annually adjusted schedule shall be made publicly available.
Per Park
Land
Park
Imprv
Com/Rec
Centers Library GeneralGov’t Police Fire Streets Traffic Signals
Admin Fee Total
Residential Development
Residential unit
< 600 SF
$1,231 $820 $316 $432 $387 $349 $160 $5,702 $659 $60 $10,116 Residential unit
600-800 SF
$1,661 $1,107 $427 $583 $523 $369 $231 $7,257 $838 $78 $13,075 Residential unit
>800-1,200 SF
$2,769 $1,846 $712 $971 $871 $389 $302 $9,072 $1,048 $107 $18,087 Residential unit
>1,200-1,900
SF
$4,368 $2,912 $1,124 $1,533 $1,374 $409 $373 $11,015 $1,272 $147 $24,527 Residential unit
>1,900-2,300
SF
$5,845 $3,896 $1,503 $2,051 $1,839 $429 $445 $12,830 $1,482 $181 $30,501 Residential unit
>2,300
$7,075 $4,717 $1,820 $2,482 $2,226 $449 $516 $14,255 $1,646 $211 $35,398 Nonresidential Development
Each SF
Commercial
$0.859 $1.983 $0.498 $29.625 $3.422 $0.218 $36.606
Each SF Office $0.627 $0.16 $0.178 $14.903 $1.721 $0.105 $17.695 Each SF
Industrial
$0.228 $.083 $0.124 $5.313 $0.614 $0.038 $6.401
Other
developments
not defined
$388
x #
employe
es X
0.54 $401
per call
per
year
$1,778
per call
per
year
$12,959
per peak
hour trip
$1,497
per peak
hour trip
Subtotal X
0.6%
the sum of
all values in
the previous
columns
Park Impact Fees Traffic Impact Fees
Per Park
Land
Park
Imprv
Com/Rec
Centers Library GeneralGov’t Police Fire Streets Traffic Signals Total Residential Development
Multi-Family
Unit
$3,457 $692 $610 $498 $794 $737 $353 $1,748 $119 $9,008 Single-Family
Unit
$4,483 $897 $792 $646 $1,028 $956 $458 $2,185 $149 $11,594 Nonresidential Development
per SF
Commercial
$0.192 $0.177 $0.85 $5.428 $0.371 $6.253
per SF
Office
$0.255 $0.237 $0.113 $4.789 $0.327 $5.721
per SF Industrial $0.128 $0.118 $0.57 $1.750 $0.120 $2.173
The proposed Development Impact Fee Schedule categorizes residential developments proportionately to the size of the units and no longer categorizes by Single-Family or Multi-family use. This results in six (6) Impact Fee tiers based on the square feet of the proposed units. Another difference between the existing and proposed fee schedule is the inclusion of a category for “other developments not defined”. This allows city staff to assess the impact of new development on city resources/facilities on a case-by-case basis for nonresidential developments that do not fit “Commercial”, “Industrial”, or “Office” use types. It is important to note here that while there is a total of ten (10) columns for Development Impact Fees under the proposed updated schedule, there is only one (1) additional fee proposed in the schedule, which is the proposed “Administrative Fee”. The sole purpose of the
0.6% Administrative fee is to fund nexus study renewals, which are required by State Law to be prepared every eight (8) years. Under the existing Development Impact Fee schedule (and corresponding nexus study), the Parks Impact Fund, consisting of three facility types/uses, was consolidated into one fund/account, and the Traffic Impact Fund, consisting of two facility types/uses, was also consolidated into one (1) fund/account. The updated development impact fee schedule proposed to separate each facility type/use which results in more columns in the new schedule.
Not shown in Table 3 is the formula for assessing Development Impact fees for Accessory Dwelling Units. The limitations on assessing Impact Fees for developments under this category are included in CMC Chapter 17.69 “Accessory Dwelling Units and Junior Accessory Dwelling Units”, the limitations/parameters for assessing Development Impact Fees on ADUs are compliant with State Law. A description of the formula to be used was included in the nexus study on page 2-6, and in the Resolution under Section 8. Applicability. Under the Proposed Development Impact Fee Schedule, the fee for the ADU would be charged based on where the primary unit falls under the new schedule, based on the primary unit's square footage.
In addition to the above changes, Government Code Section 66016.5 requires that a large jurisdiction (a large jurisdiction is a county with a population over 250,000) adopt a Capital Improvement plan as part of the nexus study. Resolution CC 2024-57 would approve the 2025-2029 Capital Improvement Program attached as Exhibit B, as part of the Nexus Study, pursuant to Government Code Section 66016.5. Subsequent 5-year CIPs which identify new projects or changes to existing projects that are proposed to be partially funded out of Development Impact Fee Funding, will require an amendment of the nexus study exhibit CIP. The City’s five-year capital improvement program dated June 4, 2024 includes projects that are planned to be partially funded through development impact fees which are identified facilities in the 2024 nexus study. The Covina Recreation Village Project is one such example, which is being funded through several grant awards in addition to impact fees collected. The Covina Recreation Village project consists of facilities identified in the nexus study (new parks and library facilities), and the project would serve new development in the form of providing additional parks and recreational, and library facilities for the community.
Public Improvements in Exchange for Development Impact Fee Credits Finally, Resolution CC 2024-57 authorizes the City Manager to enter into Agreements with development Applicants on behalf of the city in cases where an oversized public improvement or land dedication offered by the development applicant would serve the public (The current fair market value of said real property or the public improvement must not less than the total amount of development impact fees owed to the city). In 2020, the City Council authorized such an agreement with Trumark Homes via a Put Option Agreement, by which Development Impact Fees imposed on the Covina Bowl Development Project were credited in exchange for real property (the Covina Recreation Village project location).
FISCAL IMPACT:
There is no fiscal impact at this time. However, the proposed Development Impact Fees in the report are estimated to generate 29.89 million dollars (The majority for streets and traffic signals at 18.85 Million) in restricted funding that can be used towards Capital Improvement Projects directly related to the impact on additional development (additional residential and service population) in the city, by 2040. It is important to note here that any capital improvement projects utilizing development impact fees that also serve the existing population, must not solely rely on development impact fees and must leverage other funding sources.
PUBLIC HEARING NOTICE AND NOTIFICATION
Government Code Section 66016.5(a)(7) requires that all nexus studies be adopted at a public hearing with at least 30 days’ notice and Government Code Sections 6062(a) and 66018, require two publications of notice for 10 days in a newspaper regularly published once a week or oftener, with at least five days intervening between the dates of the first and last publication. The Development Impact Fee Nexus Study was first introduced to the City Council and agendized at a regularly scheduled public meeting on March 19, 2024. On Thursday, June 6 th, the Nexus study was posted on the City’s website, and first public hearing notice was posted on the City website and published in the San Gabriel Valley Examiner. The Public Hearing noticed was published again on Thursday July 4, 2024, and Thursday July 11, 2024. In addition to the above, an email notification was sent to parties which have requested notification for fee changes on July 2, 2024.
CEQA (CALIFORNIA ENVIRONMENTAL QUALITY ACT):
The approval of the Nexus Study, Capital Improvement Program associated with the Nexus Study, and the adoption of the DIFs specified in this Resolution will not have a significant impact on the environment and are exempt from CEQA pursuant to Section 15061(b)(3) of State CEQA Guidelines because these actions involve the adoption of DIFs and no specific development is authorized by the adoption of the Nexus Study or the adoption of new DIFs. Furthermore, the Capital Improvement Program is a prioritizing and funding allocation program and cannot and does not have the potential to cause a significant effect on the environment. No physical activity will occur until all required environmental review is conducted at the time the physical improvements prioritized in the Capital Improvement Program are undertaken at a future unspecified date. In addition, the adoption of this Resolution approves and sets forth a procedure for determining fees for the purpose of obtaining funds for capital projects and equipment necessary to maintain service within existing service areas and is statutorily exempt from CEQA pursuant to State CEQA Guidelines Section 15273(a)(4). Also, approval of the Capital Improvement Program associated with the Nexus Study, is exempt from the requirements of CEQA pursuant to State CEQA Guidelines Section 15378(b)(4) because the Capital Improvement Program is not a “project” as defined by CEQA, but involves the creation of government funding mechanisms or other government fiscal activities that do not involve any commitment to any specific project that may result in a potentially significant physical impact on the environment.
Respectfully submitted,
RESOLUTION CC 2024-57
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF COVINA,
CALIFORNIA, APPROVING AND ADOPTING AN UPDATED COVINA
DEVELOPMENT IMPACT FEE STUDY, ADOPTING A CAPITAL
IMPROVEMENT PROGRAM AS PART OF THE DEVELOPMENT
IMPACT FEE STUDY, ADOPTING A REVISED DEVELOPMENT
IMPACT FEE SCHEDULE AND MAKING DETERMINATIONS UNDER
THE CALIFORNIA ENVIRONMENAL QUALITY ACT
WHEREAS, on November 5th, 2005, The Covina City Council adopted Resolution No. 05-6475, establishing a Development Impact Fee (“DIF”) Schedule, which imposes certain development impact fees upon applicants for development approvals; and WHEREAS, Assembly Bill No. 602, signed into law on September 28, 2021, and effective January 1, 2022, requires that a local agency that conducts an impact fee nexus study after January 1, 2022, must comply with new standards and practices, including, but not limited to, calculating a fee levied or imposed on a housing development project to be proportionate to the square footage of proposed units; and
WHEREAS, the City wishes to revise the Development Impact Fee Schedule to reflect the changes signed into law by Assembly Bill No. 602, and so hired a consultant, NBS Government Finance Group (“NBS”) to prepare the Covina Development Impact Fee Study and recommend updated and amended Development Impact Fees; and
WHEREAS, at the City’s request, NBS prepared an updated Development Impact Fee Study dated March 14, 2024 (“Nexus Study”), included as Exhibit “A”, and the City prepared a correlating Capital Improvement Program dated June 4, 2024, included as Exhibit “B” in compliance with Government Code Section 66016.5; and
WHEREAS, the Nexus Study identifies the purpose of each fee, the use to which each fee will be put, demonstrates a reasonable relationship between each fee’s use and the type of development project on which the fee will be imposed and provides how there is a reasonable relationship between the amount of each fee and the cost of the public facility or equipment or portion of the public facility or equipment attributable to the development on which each fee is imposed. The Nexus Study is incorporated herein by this reference as is set forth in full. In addition, the Nexus Study and Capital Improvement Program identified capital projects necessary to meet the goals, programs, and objectives within the City’s General Plan; and WHEREAS, residential, commercial, and industrial growth within the City of Covina creates an ever-increasing need for new street, traffic, police, fire, general government, park, library, and other public infrastructure facilities and improvements (“Public Facilities/Improvements”) throughout the City to meet the demand of new development and continue providing those high-quality public services expected by persons who live and work within the City; and
WHEREAS, the City Council finds that the approval of development projects is of special benefit to development project applicants (“Applicants”) and that development projects
Resolution CC 2024-57 Page 2 of 7
constructed by applicants pose a special burden upon Public Facilities/Improvements within the City separate and apart from and in addition to that of the general public; and therefore, in the interests of fairness to the general public, the City desires to better recover the costs of development impact fees upon Public Improvements from Applicants who have sought the City’s approval for development projects; and
WHEREAS, the City Council finds that the purpose of the impact fees hereby enacted is to protect the public health, safety, and welfare by requiring new development to contribute to the cost of public facilities needed to mitigate the impacts of new development on the need for public facilities; and
WHEREAS, the City Council finds that the revenue from impact fees hereby enacted will be used to provide public facilities needed to mitigate the impacts of new development in the City, as identified within the City’s 2025-2029 Five (5) Year Capital Improvement Program (CIP); and WHEREAS, there may be those circumstances where an Applicant is willing to construct oversized Public Improvements or convey real property to the City on which Public Improvements will be locatedin lieu of paying certain Development Impact Fees for a Project , and where the City finds that it is in the best interests of the public to allow for the entry into agreements with Applicants which will provide a credit to the Applicant against certain Development Impact Fees in exchange for the Applicant’s construction of oversized Public Improvements or conveyance of real property; and
WHEREAS, pursuant to Government Code Section 66000, et seq., the City is empowered to impose fees and other exactions to provide necessary Public Improvements required to mitigate the effects of new development in the City; and
WHEREAS, Government Code Section 66016.5(a)(7) requires that all studies shall be adopted at a public hearing with at least 30 days’ notice, and the local agency shall notify any member of the public that requests notice of intent to begin an impact fee nexus study of the date of the hearing; and
WHEREAS, the City Council duly published notice of the Nexus Study as described above on June 6, 2024 and conducted a public hearing on July 16, 2024, at which time the public was invited to make oral and written presentations as part of the regularly scheduled meeting before the adoption of this resolution; and
WHEREAS, Government Code Sections 6062(a), and 66018, require two publications of notice for 10 days in a newspaper regularly published once a week or oftener, with at least five days intervening between the dates of the first and last publication; and WHEREAS, the City published such notices as required by Government Code Sections 6062(a), and 66018, on July 4, 2024, and July 11, 2024.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF COVINA, CALIFORNIA, DOES HERBY RESOLVE AS FOLLOWS:
SECTION 1. The City Council hereby adopts the findings outlined in the Recitals above.
Resolution CC 2024-57 Page 3 of 7
SECTION 2. CEQA. The approval of the Nexus Study, Capital Improvement Program associated with the Nexus Study, and the adoption of the DIFs specified in this Resolution, was reviewed in accordance with the criteria contained in the California Environmental Quality Act (“CEQA”) and the State CEQA Guidelines. The City Council finds that approval of the Nexus Study and the adoption of the DIFs specified in this Resolution will not have a significant impact on the environment and are exempt from CEQA pursuant to Section 15061(b)(3) of State CEQA Guidelines because these actions involve the adoption of DIFs and no specific development is authorized by the adoption of the Nexus Study or the adoption of new DIFs. Furthermore, the Capital Improvement Program is a prioritizing and funding allocation program and cannot and does not have the potential to cause a significant effect on the environment. No physical activity will occur until all required environmental review is conducted at the time the physical improvements prioritized in the Capital Improvement Program are undertaken at a future unspecified date. Therefore, the approval and adoption of the Nexus Study, Capital Improvement Program associated with the Nexus Study, and adoption of the DIFs does not have the potential for causing a significant effect on the environment. In addition, the adoption of this Resolution approves and sets forth a procedure for determining fees for the purpose of obtaining funds for capital projects and equipment necessary to maintain service within existing service areas and is statutorily exempt from CEQA pursuant to State CEQA Guidelines 15273(a)(4). Also, approval of the Capital Improvement Program associated with the Nexus Study, is exempt from the requirements of CEQA pursuant to State CEQA Guidelines Section 15378(b)(4) because the Capital Improvement Program is not a “project” as defined by CEQA, but involves the creation of government funding mechanisms or other government fiscal activities that do not involve any commitment to any specific project that may result in a potentially significant physical impact on the environment. City staff are hereby directed to prepare and file a Notice of Exemption, under the California Environmental Quality Act, within 5 working days of adoption of the Resolution according to CEQA Guidelines Section 15062.
SECTION 3. The City Council of the City of Covina finds that the Nexus Study complies with California Government Code Section 66001 et seq., by establishing the basis for imposing fees for new development. For each fee recommended to be imposed, the Nexus Study demonstrates the following:
1. Government Code Section 66001(a)(1). Identify the purpose of the fee.
The City Council finds this requirement satisfied. The purpose of the fees calculated in this Nexus Study is to fund the acquisition or construction of certain capital assets that will be needed to mitigate the impacts of new development on the needs for public facilities and to maintain an acceptable level of public services as the City resident and service population grows.
2. Government Code Section 66001(a)(2). Identify the use of the fee.
The City Council finds this requirement satisfied because: A) the specific uses/facilities for which impact fees are to be used are identified in the Nexus Study; and B) the specific projects for which Development Impact Fees are proposed to be used are identified within the City’s 2025-2029 Five (5) year Capital Improvement Program (“CIP”).
Resolution CC 2024-57 Page 4 of 7
3. Government Code Section 66001(a)(3). Determine how there is a reasonable relationship between the fee’s use and the type of development project on which the fee is imposed.
The City Council finds this requirement is satisfied for each fee imposed. An explanation of the reasonable relationship between the use of each fee and the development types on which they are imposed is demonstrated within the Nexus Study and is hereby incorporated by this reference.
4. Government Code Section 66001(a)(4). Determine how there is a reasonable relationship between the need for the public facility and the type of development on which it is imposed;
The City Council finds this requirement is satisfied for each fee imposed. New development increases the need for public facilities (Libraries, Police and Fire Services, Government Services, Parks and Recreation, etc.) because of the increase in population that needs these public facilities and related services. An explanation for the reasonable relationship between the need for the facility and the type of development on which it is imposed is provided within the Nexus Study for each fee assessed and is hereby incorporated by this reference; and,
5. Government Code Section 66001(b). Determines the reasonable relationship between the amount of the Fees and the cost of the public facilities or portions of the facilities attributable to the development on which the Fees are imposed; The City Council finds this requirement is satisfied. For each fee, an assessment of the reasonable relationship between the proposed (updated) fee and the facility cost attributable to a development project is described in the Nexus Study and is hereby incorporated by this reference.
SECTION 4. Adoption of Nexus Study and Mitigation Fee Act Findings. The City Council hereby approves and adopts the City of Covina Development Impact Fee Study prepared by NBS, Government Finance Group dated March 14, 2024 (“Nexus Study”) attached hereto as Exhibit “A” and incorporated by this reference and adopts the findings contained therein. The Development Impact Fee Study shall be made available for public inspection within the office of the City Clerk, and on the City’s website within 30 days of adoption.
SECTION 5. Adoption of a Capital Improvement Program. The City Council hereby adopts the 5-year Capital Improvement Program attached hereto as Exhibit “B” and incorporated by this reference, as a part of the Nexus Study. Subsequent 5-year Capital Improvement Programs which identify new projects or changes to previously identified projects that are proposed to be partially funded out of Development Impact Fee funding will require an amendment of Exhibit B.
SECTION 6. Establishing the Amount of and Adopting the Development Impact Fees.
The City Council hereby adopts the City of Covina Development Impact Fee Schedule attached hereto as Exhibit “C” and incorporated by this reference. Unless otherwise stated in the Fee Schedule, all Development Impact Fees shall be paid to the City at the following times:
Resolution CC 2024-57 Page 5 of 7
a. For residential development – prior to the date of final inspection, or the date the certificate of occupancy is issued, whichever occurs first. For residential projects containing more than one dwelling unit, all Development Impact Fees should be paid prior to the date the first dwelling unit within the project receives its final inspection or certificate of occupancy, whichever occurs first.
b. For commercial and industrial developments – prior to the City’s issuance of a building permit for any phase of the project.
Notwithstanding the above, the newly adopted Development Impact Fee schedule shall not be collected from projects that have, before the effective date of this Resolution, already received all required discretionary land use entitlements and permits from the City Council and/or Planning Commission to proceed with the development of the project. Development Impact Fees required for those developments before this date shall remain unchanged. (i.e., general plan amendment, specific plan, tentative map, vesting tentative map, parcel map, zone change, conditional use permit, variance, planned community development, site plan review, etc.).
SECTION 7. Adoption of Methodology for Calculation, Adjustment, and Collection of Development Impact Fees. The City Council hereby ratifies, approves and adopts the methodology set forth in the Nexus Study for calculating and collecting the DIFs adopted herein.
The DIFs established in Exhibit “C” shall be calculated, adjusted, and collected in accordance with this Resolution and the Nexus Study. The amount of the DIFs shall be adjusted annually in July of each calendar year, using the Construction Cost Index (CCI) for the Los Angeles Region as reported by Engineering News Record (ENR) for the twelve-month period ending in May or a similar published index if the CCI Index is no longer available.
SECTION 8. Applicability. Development Impact Fees shall be collected from only the following types of projects:
a. For Residential Development: Projects where new dwelling units are created as a result. Development Impact Fees shall not be charged to projects merely involving the replacement, reconstruction, improvement, or expansion of pre-existing residential units but where no new dwelling units are created (i.e., room additions, replacement, or reconstruction after a fire, earthquake, or disaster, etc.), or for construction of new Accessory Dwelling Units (“ADUs”) under 750 square feet. For ADUs 750 square feet or more, impact fees shall be charged proportionally to the square footage of the primary dwelling unit. The formula is shown below:
The formula for calculating proportional ADU Impact Fees:
Primary unit impact fee X (ADU square feet/Primary unit square feet) b. For Commercial, Office, or industrial Development: Projects where new square footage is created as a result. Development impact Fees shall not be charged to projects merely involving the replacement, reconstruction, or improvement of pre-existing commercial/industrial/office square footage (i.e., replacement or reconstruction after fire, earthquake or disaster, improvements or refurbishments, etc.). However, to the extent that a replacement, reconstruction, or improvement project results in greater
Resolution CC 2024-57 Page 6 of 7
square footage than pre-existing, Development Impact Fees shall be charged upon the additional square footage.
c. Other Developments not defined: New nonresidential development projects not otherwise defined. Development Impact Fees for this category are dependent upon the level of measurable impact on city resources/facilities.
SECTION 9. No Changes to Other City Fees. The fees imposed by this Resolution shall apply only to those Development Impact Fees described above. All other community development and user service fees adopted by the City Council pursuant to prior City of Covina ordinances or resolutions, as may be amended from time to time, or any future ordinances or resolutions adopted for such purposes, shall remain in full force and effect. Nothing in this Resolution shall repeal, amend or supersede any other City imposed fees except for the amount of specific type and category of DIF addressed in the Nexus Study and expressly established by this Resolution.
SECTION 10. Where the City Manager determines that the public interest would be served by such an agreement, he or she is hereby authorized to execute agreements on behalf of the City with Applicants in order to provide a credit to the Applicant against certain Development Impact Fees in exchange for the Applicant’s construction of Public Improvements or in exchange for the Applicant’s conveyance by grant deed to the City of real property on which Public Improvements will be located or constructed, so long as the then-current fair market value of said real property (as determined by an appraiser engaged by City at Applicant’s cost), or a combination of such fair market value and the amount of the Development Impact Fees paid by the Applicant, is not less than the total amount of Development Impact Fees owed to the City. Any agreement authorized under this Section 10 shall be based on those reasonable terms and conditions as the City Manager may determine on a case-by-case basis.”
SECTION 11. Effective Date. The development impact fees established by this Resolution shall be effective on the sixtieth (60th) day following the adoption of this Resolution.
SECTION 12. Severability. If any section, subsection, clause or phrase of this Resolution is for any reason held to be unconstitutional, or otherwise invalid, such decision shall not affect the validity of the remaining sections hereof. The City Council hereby declares that it would have passed this Resolution and each section, subsection, clause and phrase hereof irrespective of the fact that any one or more other sections, subsections, clauses or phrases be declared invalid.
SECTION 13. Certification. The City Clerk shall certify as to the adoption of this resolution.
APPROVED and PASSED this 16th day of July, 2024.
City of Covina, California
BY:
JOHN C. KING, Mayor
Resolution CC 2024-57 Page 7 of 7
ATTEST:
FABIAN VELEZ, Chief Deputy City Clerk
CERTIFICATION
I, Fabian Velez, Chief Deputy City Clerk of the City of Covina, do hereby certify that Resolution CC 2024-57 was duly adopted by the City Council of the City of Covina at a regular meeting held on the 16th day of July, 2024, by the following vote:
AYES: COUNCIL MEMBERS:
NOES: COUNCIL MEMBERS:
ABSTAIN: COUNCIL MEMBERS:
ABSENT: COUNCIL MEMBERS:
Dated:
FABIAN VELEZ, Chief Deputy City Clerk
Final Report
Development Impact Fee Study
Final Report
March 14, 2024
nbsgov.com
Prepared by:
Corporate Headquarters
32605 Temecula Parkway, Suite 100
Temecula, CA 92592
Toll free: 800.676.7516
Table of Contents
Executive Summary ......................................................................................................................... S-1 Organization of the Report .................................................................................................................... S-1 Development Data ................................................................................................................................. S-2 Impact Fee Analysis ................................................................................................................................ S-2 Use of the Fees ....................................................................................................................................... S-5 Impact Fee Summary ............................................................................................................................. S-5 Projected Revenue ................................................................................................................................. S-8 Chapter 1. Introduction ................................................................................................................... 1-1 Purpose .................................................................................................................................................. 1-1 Legal Framework for Impact Fees .......................................................................................................... 1-1 Recent Legislation .................................................................................................................................. 1-5 Impact Fee Calculation Methodology .................................................................................................... 1-7 Facilities Addressed in this Study ........................................................................................................... 1-8 Chapter 2. Development Data ......................................................................................................... 2-1 Study Area and Time Frame ................................................................................................................... 2-1 Development Types ............................................................................................................................... 2-1 Residential Development and Population ............................................................................................. 2-2 Units of Development ............................................................................................................................ 2-3 Demand Variables .................................................................................................................................. 2-3 Demand Factors ..................................................................................................................................... 2-6 Existing and Future Development .......................................................................................................... 2-8 Growth Potential .................................................................................................................................. 2-10 Chapter 3. Park Land and Park Improvements .................................................................................. 3-1 Methodology .......................................................................................................................................... 3-1 Service Area ........................................................................................................................................... 3-1 Demand Variable ................................................................................................................................... 3-1 Existing Parks and Existing Level of Service ........................................................................................... 3-2 Cost Per Capita ....................................................................................................................................... 3-3 Impact Fees per Unit .............................................................................................................................. 3-4 Projected Revenue ................................................................................................................................. 3-5 Updating the Fees .................................................................................................................................. 3-6
Nexus Summary ..................................................................................................................................... 3-6 Chapter 4. Community and Recreation Centers ................................................................................ 4-1 Methodology .......................................................................................................................................... 4-1 Service Area ........................................................................................................................................... 4-1 Demand Variable ................................................................................................................................... 4-1 Existing Facilities and Existing Level of Service ...................................................................................... 4-1 Impact Fees per Unit .............................................................................................................................. 4-2 Projected Revenue ................................................................................................................................. 4-3 Updating the Fees .................................................................................................................................. 4-3 Nexus Summary ..................................................................................................................................... 4-3 Chapter 5. Libraries ......................................................................................................................... 5-1 Methodology .......................................................................................................................................... 5-1 Service Area ........................................................................................................................................... 5-1 Demand Variable ................................................................................................................................... 5-1 Existing Facilities and Existing Level of Service ...................................................................................... 5-1 Impact Fees per Unit .............................................................................................................................. 5-2 Projected Revenue ................................................................................................................................. 5-3 Updating the Fees .................................................................................................................................. 5-4 Nexus Summary ..................................................................................................................................... 5-4 Chapter 6. General Government Facilities ........................................................................................ 6-1 Methodology .......................................................................................................................................... 6-1 Service Area ........................................................................................................................................... 6-1 Demand Variable ................................................................................................................................... 6-1 Existing Facilities and Existing Level of Service ...................................................................................... 6-1 Impact Fees per Unit .............................................................................................................................. 6-4 Projected Revenue ................................................................................................................................. 6-5 Updating the Fees .................................................................................................................................. 6-5 Nexus Summary ..................................................................................................................................... 6-5 Chapter 7. Police Department Facilities ........................................................................................... 7-1 Methodology .......................................................................................................................................... 7-1 Service Area ........................................................................................................................................... 7-1 Demand Variable ................................................................................................................................... 7-1 Existing Facilities and Existing Level of Service ...................................................................................... 7-2
Impact Fees per Unit .............................................................................................................................. 7-4 Projected Revenue ................................................................................................................................. 7-5 Updating the Fees .................................................................................................................................. 7-5 Nexus Summary ..................................................................................................................................... 7-5 Chapter 8. Fire Protection Facilities ................................................................................................. 8-1 Methodology .......................................................................................................................................... 8-1 Service Area ........................................................................................................................................... 8-1 Demand Variable ................................................................................................................................... 8-1 Existing Facilities and Existing Level of Service ...................................................................................... 8-2 Impact Fees per Unit .............................................................................................................................. 8-3 Projected Revenue ................................................................................................................................. 8-4 Updating the Fees .................................................................................................................................. 8-5 Nexus Summary ..................................................................................................................................... 8-5 Chapter 9. Street Improvements and Traffic Signals ......................................................................... 9-1 Methodology .......................................................................................................................................... 9-1 Service Area ........................................................................................................................................... 9-1 Demand Variable ................................................................................................................................... 9-1 Existing Facilities and Existing Level of Service ...................................................................................... 9-1 Impact Fees per Unit .............................................................................................................................. 9-3 Projected Revenue ................................................................................................................................. 9-4 Updating the Fees .................................................................................................................................. 9-5 Nexus Summary ..................................................................................................................................... 9-5 Chapter 10. Implementation ......................................................................................................... 10-1 Adoption .............................................................................................................................................. 10-1 Administration ..................................................................................................................................... 10-2 Requirements Imposed by AB 602 ....................................................................................................... 10-6 Training and Public Information .......................................................................................................... 10-7 Recovery of Administrative Costs ........................................................................................................ 10-8 Appendices
Fee Comparison Appendix A
City of Covina Page S-1
Development Impact Fee Study
March 14, 2024
Executive Summary
The City of Covina retained NBS Government Finance Group to prepare this study to analyze the impacts of new development on several types of City capital facilities and to calculate impact fees based on that analysis. The methods used in this study are intended to satisfy all legal requirements of the U. S. Constitution, the California Constitution and the California Mitigation Fee Act (Government Code Sections 66000 et seq.).
Organization of the Report
Chapter 1 of this report provides an overview of the legal requirements for establishing and imposing such fees, and methods that can be used to calculate impact fees.
Chapter 2 contains data on existing and future development used in this report.
Chapters 3 through 9 analyze the impacts of development on specific types of facilities and calculate impact fees for those facilities. The facilities addressed in this report are listed by chapter below:
Chapter 3. Park Land and Park Improvements
Chapter 4. Community and Recreation Center Facilities
Chapter 5. Library Facilities and Materials
Chapter 6. General Government Facilities, Vehicles and Equipment Chapter 7. Police Department Facilities, Vehicles and Equipment Chapter 8. Fire Department Facilities
Chapter 9 Street Improvements and Traffic Signals
Chapter 10 contains recommendations for adopting and implementing impact fees, including suggested findings to satisfy the requirements of the Mitigation Fee Act.
Appendix A to this report provides a comparison of Covina’s existing and proposed impact fees to the cities of Claremont, Glendora, Monterey Park, San Dimas, San Gabriel and West Covina.
The purpose of the comparison is to provide a sense of the regional and/or comparable pricing for impact fees, and to use that information to gauge the impact of recommendations for fee adjustments. It should be noted that comparison to other agencies do not provide information about the cost recovery policies or procedures followed in relation to their impact fees. A “market-based” decision to price services below the maximum impact fee calculation, is the same as making a decision to subsidize that service. Survey efforts are sometimes also non-conclusive for certain fee categories and development types because of varied terminology and approaches to calculating impact fees.
City of Covina Page S-2
Development Impact Fee Study
March 14, 2024
Development Data
Chapter 2 of this report presents estimates of existing development in Covina and a forecast of future development. Covina is a largely built-out city and new development mostly involves infill or intensification and redevelopment, so forecasting future development involves considerable uncertainty. This study includes a forecast of future residential development, but no forecast of future non-residential development. It is important to note that the methods used to calculate impact fees in this report do not depend on forecasts of future development.
Chapter 2 also establishes values for factors such as population per unit, service population per unit, police and fire calls per unit and peak hour vehicle trips per unit that are used in the impact fee calculations.
It is important to note that because of provisions of AB 602 that were incorporated into California law effective in 2022, impact fee categories for residential development in this study are defined in terms of unit size categories, broken down by square footage. Prior to the adoption of AB 602 it was common practice to base residential impact fees on unit type categories (e.g., single-family or multi-family units).
Impact Fee Analysis
The impact fee analysis for each type of facility addressed in this report is presented in a separate chapter. In each case, the relationship, or nexus, between development and the need for a particular type of facility is defined in a way that allows the impact of additional development on facility needs to be quantified.
The impact fees are based only on capital costs for facilities and other capital assets needed to mitigate the impacts of additional development. Impact fees may not be used to pay for maintenance or operations.
Another change brought about by AB 602 is that all of the impact fees calculated in this report are based on the existing level of service, so that the impact fees are set at the level needed to maintain that level of service as additional development occurs. The existing levels of service for the facility types addressed in this report are defined in Chapters 3 through 9 and are discussed in the brief chapter-by-chapter summaries below. Impact fees calculated in this report are shown on page S-5 of this Executive Summary.
The following paragraphs briefly discuss the methods used to calculate impact fees for each of the facility types addressed in this study.
Park Land and Park Improvements. Chapter 3 of this report calculates impact fees for park land acquisition and park improvements. The cost of park maintenance vehicles and equipment is included in the park improvement impact fees.
Impact Fees for Park Land Acquisition. The impact fees for park land acquisition calculated in Chapter 3 apply only to residential development that does not involve a subdivision or parcel map. The City has an existing ordinance (Chapter 16.28 of the Covina Municipal Code) that
City of Covina Page S-3
Development Impact Fee Study
March 14, 2024
requires developers of residential subdivisions to dedicate land for parks or to pay fees in lieu of dedication, as authorized by the Quimby Act. In-lieu fees that would be charged under that chapter may be different from the park impact fees calculated in this report for two reasons: (1) the Quimby Act allows park land dedication requirements and in-lieu fees to be based on a standard of 3.0 acres per thousand residents, while the Mitigation Fee Act requires impact fees to be based on the existing ratio of park acres to population which is lower in Covina; and, (2) the in lieu fees under Chapter 16.28 are based on the fair market value of the land being developed, whereas the park land impact fees calculated in Chapter 3 are based on a standardized cost per acre.
The park land impact fees calculated in Chapter 3 are based on the City’s existing ratio of park land to population (acres per capita), and the land cost per acre used in those calculations is based on the estimated cost per acre for park land. The cost per capita for park land acquisition is calculated as the existing acres per capita multiplied by the cost per acre for the Banna Park site. To calculate impact fees, the land cost per capita is multiplied by population per unit for each type of residential development to get an impact fee per unit by development type. Impact fees for park land acquisition do not apply to non-residential development.
Impact Fees for Park Land Improvements. The park improvement impact fees calculated in Chapter 3 are based on the City’s existing ratio of park land to population (acres per capita) and the estimated cost per acre for park improvements. The cost of park maintenance vehicles and equipment is incorporated into the park improvement impact fees, but that component represents less than 1% of those fees.
The cost per capita for park improvements is calculated as the existing acres per capita multiplied by the estimated cost per acre for park improvements based on the improvement costs for Banna Park. Then the cost per capita is multiplied by population per unit for each type of residential development to get an impact fee per unit by development type. Impact fees for park improvements do not apply to non-residential development.
The impact fees calculated in this report for park land and park improvements are shown in Table S.1 on page S-5.
Community and Recreation Center Facilities. Chapter 4 of this report calculates impact fees for community and recreation center facilities including the aquatic center, other community and recreation centers and the Parks and Recreation Department office.
The impact fees are based on the City’s existing level of service for these facilities which is defined as the relationship between the existing population and the replacement cost of existing community and recreation center facilities. That relationship is stated as a cost per capita. The impact fees for community and recreation center facilities are calculated as the cost per capita multiplied by the population per unit for each type of residential development. The impact fees for community and recreation center facilities do not apply to non-residential development.
City of Covina Page S-4
Development Impact Fee Study
March 14, 2024
The impact fees calculated in this report for community and recreation center facilities are shown in Table S.1 on page S-5.
Library Facilities and Materials. Chapter 5 of this report calculates impact fees for library facilities and materials.
The Library impact fees are based on the City’s existing level of service which is defined as the relationship between the existing population and the replacement cost of existing Library facilities and materials. That relationship is stated as a cost per capita. The impact fees are calculated as the cost per capita multiplied by the population per unit for each type of residential development. The impact fees for Library facilities and materials do not apply to non-residential development.
The impact fees for Library facilities and Library materials are calculated separately in Chapter 5, but they are shown as a combined fee in Table S.1 on page S-5.
General Government Facilities. Chapter 6 of this report calculates impact fees for general government facilities including City Hall, the City Yard facilities and the Civic Center Parking Structure. Those impact fees also include the cost of vehicles and equipment assigned to general government departments, most of which belong to Public Works.
The impact fees are based on the City’s existing level of service for these facilities which is defined as the relationship between the existing service population and the replacement cost of the existing facilities. That relationship is stated as a cost per capita of service population. The impact fees for general government facilities are calculated as the cost per capita of service population multiplied by the service population per unit for each type of development. The impact fees for community and recreation center apply to both residential and non-residential development.
The impact fees calculated in this report for general government facilities are shown in Table S.1 on page S-5.
Police Department Facilities. Chapter 7 calculates impact fees for Police Department facilities and vehicles based on the existing level of service in the City. The existing level of service is defined as the relationship between the replacement cost of existing Police Department facilities, vehicles and equipment and the number of calls for service per year received by the Department.
That relationship is stated as a cost per call for service per year.
As part of this study, NBS analyzed the distribution of Police Department calls for service for a full year to determine the average number of calls per unit per year generated by different types of development. The impact fee per unit for each type of development is calculated by multiplying the cost per call and the number of calls per unit per year for each type of development. Police impact fees are intended to apply to all types of new development in the City.
The impact fees calculated in this report for Police Department facilities are shown in Table S.1 on page S-5.
Fire Department Facilities. Chapter 8 calculates impact fees for Covina’s Fire Department facilities, based on the existing level of service in the City. The cost of firefighting apparatus and
City of Covina Page S-5
Development Impact Fee Study
March 14, 2024
vehicles used by the department are not included in the impact fee calculations because the Los Angeles County Fire Department provides those assets under its contract with the City. The existing level of service is defined as the relationship between the replacement cost of existing Fire Department capital facilities and the number of calls for service per year received by the Fire Department. That relationship is stated as a cost per call for service per year.
As part of this study, NBS analyzed the distribution of Fire Department calls for service for a full year to determine the average number of calls per unit per year generated by different types of development. The impact fee per unit for each type of development is calculated by multiplying the cost per call by the number of calls per unit per year for each type of development. Fire protection impact fees are intended to apply to all types of new development in the City.
The impact fees calculated in this report for Fire Department facilities are shown in Table S.1 below.
Street Improvements and Traffic Signals. Chapter 9 calculates impact fees for street improvements and traffic signals based on the existing level of service in the City. The existing level of service is defined as the relationship between the replacement cost of existing arterial and collector streets and traffic signals and the number of peak hour vehicle trips per day generated by existing development in the City. That relationship is stated as a cost per peak hour trip. The impact fee per unit for each type of development is calculated by multiplying the cost per peak hour trip by the number of peak hour trips per unit for each type of development. Those impact fees are intended to apply to all types of new development in the City.
Impact fees for street improvements and traffic signals are calculated separately and are shown in Table S.1 below.
Use of the Fees
Revenue from impact fees calculated in this report will be used in accordance with the City of Covina Capital Improvement Plan (CIP). That plan will be considered and adopted concurrently with consideration and adoption of the impact fees calculated in this report.
Impact Fee Summary
Table S.1 on the next page summarizes the impact fees calculated in this report. This study calculates impact fees for the Public/Quasi-Public development category so that the impact of that development is accounted for in the fee calculations. However, those fees are not shown in the following tables because the City lacks authority to impose those fees on public schools or on projects constructed by other governmental entities.
For development projects that do not fit well into one of the development type categories defined in this study, Table S.1 shows how impact fees can tailored to the actual impact of such projects using inputs such as number of employees, police calls per year, fire calls per year, and p.m. peak hour vehicle trips per weekday.
City of Covina Page S-6
Development Impact Fee Study
March 14, 2024
Trip data can be found in the Institute of Transportation Engineers (ITE) manual titled Trip Generation, which is commonly used by transportation planners and traffic engineers. The other inputs to the model must be estimated from project-specific data. Employees per unit can best be provided by the applicant. Police and fire calls per unit per year can be estimated by using call data for existing projects of a similar nature in the City. This study used a spreadsheet listing all police and fire calls for service for a one-year period, and when those calls are sorted by address it is relatively easy to determine the number of calls per year to the addresses of existing facilities.
Then, the number of calls per year can be divided by the number of units (KSF) at an address to get calls per unit per year, which can then be multiplied by the number of units in the project.
Table S.2 shows the proposed impact fees from Table S.1 with the addition of a 0.6% administrative fee. That percentage is intended to cover the cost of preparing a $50,000 impact fee update study every eight years as required by the Mitigation Fee Act, and is calculated by dividing the average annual study costs (50,000 / 8 = $6,250) by the average annual revenue ($29,827,038 / 30 years = $994,235). The annual revenue number assumes the revenue projected in this report is received over 30 years. The administrative fee percentage is calculated as $6,250 / $994,235 = 0.006 or 0.6%.
As part of the process of adopting the impact fees, the City Council can decide whether or not to add the administrative fee to the impact fees so that impact fee revenue can be used to pay for future impact fee studies.
Table S.1: Summary of Proposed Impact Fees
Development
Type
Unit
Type 1
Park
Land
Park
Imprv
Com/Rec
Centers Library
General
Gov't Police Fire Streets
Traffic
Signals Total
Residential: <600 Sq. Ft. DU $ 1,231 $ 820 $ 316 $ 432 $ 387 $ 349 $ 160 $ 5,702 $ 659 $ 10,056 Residential: 600-800 Sq. Ft. DU $ 1,661 $1,107 $ 427 $ 583 $ 523 $ 369 $ 231 $ 7,257 $ 838 $ 12,997 Residential: >800-1,200 Sq. Ft. DU $ 2,769 $1,846 $ 712 $ 971 $ 871 $ 389 $ 302 $ 9,072 $ 1,048 $ 17,979 Residential: >1,200-1,900 Sq. Ft. DU $ 4,368 $2,912 $ 1,124 $1,533 $ 1,374 $ 409 $ 373 $11,015 $ 1,272 $ 24,381 Residential: >1,900-2,300 Sq. Ft. DU $ 5,845 $3,896 $ 1,503 $2,051 $ 1,839 $ 429 $ 445 $12,830 $ 1,482 $ 30,319 Residential: >2,300 Sq. Ft. DU $ 7,075 $4,717 $ 1,820 $2,482 $ 2,226 $ 449 $ 516 $14,255 $ 1,646 $ 35,187 Commercial KSF $ 859 $1,983 $ 498 $29,625 $ 3,422 $ 36,387 Office KSF $ 627 $ 160 $ 178 $14,903 $ 1,721 $ 17,589
Industrial KSF $ 228 $ 83 $ 124 $ 5,313 $ 614 $ 6,363
Other development that does not fit any of the categories above $388 X No.
of Empl. X
0.54 $401
per call
per Year
$1,778
per call
per year
$12,959
per peak
hour trip
$1,497
per peak
hour trip
1 DU = dwelling unit; KSF = 1,000 gross square feet of building area
City of Covina Page S-7
Development Impact Fee Study
March 14, 2024
Table S.3 shows the City’s existing impact fees. Those impact fees were adopted in 2005 and have not been increased since that time. Because of the differences between the residential development categories used in this study and those used for the City’s existing fees, the impact fees shown in Table S.3 for the three smallest unit size categories are the existing multi-family unit impact fees, and the impact fees shown for the three largest unit size categories are the existing single-family unit impact fees.
Also, while the resolution adopting the City’s existing impact fees combined the impact fees for park land, park improvements and recreation facilities into a single fee and the impact fees for street improvements and traffic signals into a single fee, Table S.3 breaks those fees out as they were originally calculated in a 2005 study. These impact fees have not been updated since they were adopted in November 2005.
Table S.4 shows the difference between the existing impact fees in Table S.3 and the proposed impact fees including the administrative fee in Table S.2. Numbers in parentheses indicate that the proposed fees are lower than the existing fees.
Table S.2: Summary of Proposed Impact Fees including a 0.6% Administrative Charge Development
Type
Unit
Type 1
Park
Land
Park
Imprv
Com/Rec
Centers Library
General
Gov't Police Fire Streets
Traffic
Signals Total
Residential: <600 Sq. Ft. DU $ 1,238 $ 825 $ 318 $ 434 $ 389 $ 351 $ 161 $ 5,736 $ 663 $ 10,116 Residential: 600-800 Sq. Ft. DU $ 1,671 $1,114 $ 430 $ 586 $ 526 $ 371 $ 233 $ 7,301 $ 843 $ 13,075 Residential: >800-1,200 Sq. Ft. DU $ 2,785 $1,857 $ 716 $ 977 $ 876 $ 391 $ 304 $ 9,126 $ 1,054 $ 18,087 Residential: >1,200-1,900 Sq. Ft. DU 4,394$ 2,930$ 1,130$ 1,542$ 1,383$ 411$ 376$ 11,082$ 1,280$ 24,527$ Residential: >1,900-2,300 Sq. Ft. DU $ 5,880 $3,920 $ 1,512 $2,063 $ 1,850 $ 432 $ 447 $12,907 $ 1,491 $ 30,501 Residential: >2,300 Sq. Ft. DU $ 7,118 $4,745 $ 1,831 $2,497 $ 2,239 $ 452 $ 519 $14,341 $ 1,656 $ 35,398 Commercial KSF $ 865 $1,995 $ 501 $29,803 $ 3,442 $ 36,606 Office KSF $ 631 $ 161 $ 179 $14,993 $ 1,732 $ 17,695
Industrial KSF 230$ 83$ 125$ 5,345 $ 617$ 6,401$
Other development that does not fit any of the categories above $390 X No.
of Empl. X
0.54 $403
per call
per Year
$1,789
per call
per year
$13,037
per peak
hour trip
$1,506
per peak
hour trip
1 DU = dwelling unit; KSF = 1,000 gross square feet of building area Table S.3: Summary of Existing Impact Fees
Development
Type
Unit
Type 1
Park
Land
Park
Imprv
Com/Rec
Centers Library
General
Gov't Police Fire Streets
Traffic
Signals Total
Residential: <600 Sq. Ft. DU $ 3,457 $ 692 $ 610 $ 498 $ 794 $ 737 $ 353 $ 1,748 $ 119 $ 9,008 Residential: 600-800 Sq. Ft. DU $ 3,457 $ 692 $ 610 $ 498 $ 794 $ 737 $ 353 $ 1,748 $ 119 $ 9,008 Residential: >800-1,200 Sq. Ft. DU $ 3,457 $ 692 $ 610 $ 498 $ 794 $ 737 $ 353 $ 1,748 $ 119 $ 9,008 Residential: >1,200-1,900 Sq. Ft. DU $ 4,483 $ 897 $ 792 $ 646 $1,028 $ 956 $ 458 $ 2,185 $ 149 $ 11,594 Residential: >1,900-2,300 Sq. Ft. DU $ 4,483 $ 897 $ 792 $ 646 $1,028 $ 956 $ 458 $ 2,185 $ 149 $ 11,594 Residential: >2,300 Sq. Ft. DU $ 4,483 $ 897 $ 792 $ 646 $1,028 $ 956 $ 458 $ 2,185 $ 149 $ 11,594 Commercial KSF $ 192 $ 177 $ 85 $ 5,428 $ 371 $ 6,253
Office KSF $ 255 $ 237 $ 113 $ 4,789 $ 327 $ 5,721
Industrial KSF $ 128 $ 118 $ 57 $ 1,750 $ 120 $ 2,173
1 DU = dwelling unit; KSF = 1,000 gross square feet of building area
City of Covina Page S-8
Development Impact Fee Study
March 14, 2024
Interpreting the figures in Table S.4 is complicated by the fact that the development types used for the City’s existing impact fees are different from those used in the current study. So, for example, the proposed park land impact fees are substantially lower than the existing fees for the smaller unit sizes and substantially higher for the larger unit sizes. While that pattern is reflected in some form for all the impact fees, certain fees are mostly lower than the existing fees while others are higher across the board. In particular, the impact fees for street improvements are much higher than the existing fees.
Table S.5 shows the percentage difference between the existing fees in Table S.3 and the proposed impact fees in Table S.2.
Projected Revenue
Overall, the projected revenue for all impact fees calculated in this study totals $29.8 million, of which $18.85 million would be generated by impact fees for streets and traffic signals. That revenue is projected only for residential development, because it was not possible to forecast future non-residential development for this study.
Table S.4: Difference Between Existing Impact Fees and Proposed Impact Fees Development
Type
Unit
Type 1
Park
Land
Park
Imprv
Com/Rec
Centers Library
General
Gov't Police Fire Streets
Traffic
Signals Total
Residential: <600 Sq. Ft. DU $(2,219) $ 133 $ (292) $ (64) $ (405) $ (386) $ (192) $ 3,989 $ 543 $ 1,108 Residential: 600-800 Sq. Ft. DU $(1,786) $ 422 $ (180) $ 88 $ (268) $ (366) $ (120) $ 5,553 $ 724 $ 4,067 Residential: >800-1,200 Sq. Ft. DU $ (672) $1,165 $ 106 $ 479 $ 82 $ (346) $ (49) $ 7,378 $ 935 $ 9,079 Residential: >1,200-1,900 Sq. Ft. DU $ (89) $2,033 $ 338 $ 896 $ 355 $ (545) $ (82) $ 8,897 $ 1,131 $ 12,933 Residential: >1,900-2,300 Sq. Ft. DU $ 1,397 $3,023 $ 720 $1,417 $ 822 $ (524) $ (11) $10,722 $ 1,341 $ 18,907 Residential: >2,300 Sq. Ft. DU $ 2,635 $3,848 $ 1,039 $1,851 $ 1,211 $ (504) $ 61 $12,156 $ 1,507 $ 23,804 Commercial KSF $ 673 $1,818 $ 416 $24,375 $ 3,071 $ 30,353 Office KSF $ 376 $ (76) $ 66 $10,204 $ 1,404 $ 11,974
Industrial KSF $ 102 $ (35) $ 68 $ 3,595 $ 498 $ 4,228
1 DU = dwelling unit; KSF = 1,000 gross square feet of building area Table S.5: Percentage Difference Between Existing and Proposed Impact Fees Development
Type
Unit
Type 1
Park
Land
Park
Imprv
Com/Rec
Centers Library
General
Gov't Police Fire Streets
Traffic
Signals Total
Residential: <600 Sq. Ft. DU -64% 19% -48% -13% -51% -52% -54% 228% 455% 12% Residential: 600-800 Sq. Ft. DU -52% 61% -30% 18% -34% -50% -34% 318% 607% 45% Residential: >800-1,200 Sq. Ft. DU -19% 168% 17% 96% 11% -47% -14% 422% 784% 101% Residential: >1,200-1,900 Sq. Ft. DU -2% 227% 43% 139% 35% -57% -18% 407% 757% 112% Residential: >1,900-2,300 Sq. Ft. DU 31% 337% 91% 219% 80% -55% -2% 491% 898% 163% Residential: >2,300 Sq. Ft. DU 59% 429% 131% 287% 118% -53% 13% 556% 1009% 205% Commercial KSF 352% 1027% 489% 449% 827% 485%
Office KSF 148% -32% 58% 213% 429% 209%
Industrial KSF 80% -29% 120% 205% 416% 195%
1 DU = dwelling unit; KSF = 1,000 gross square feet of building area
City of Covina Page 1-1
Development Impact Fee Study
July 7, 2023
Chapter 1. Introduction
Purpose
The purpose of this study is to analyze the impacts of development on the need for capital facilities and other capital assets provided by the City of Covina and to calculate impact fees based on that analysis. This report documents the approach, data and methodology used in this study to calculate impact fees.
The methods used to calculate impact fees and in-lieu fees in this report are intended to satisfy all legal requirements governing such fees, including provisions of the U. S. Constitution, the California Constitution and the California Mitigation Fee Act (Government Code Sections 66000- 66025.
Legal Framework for Impact Fees
This brief summary of the legal framework for development fees is intended as a general overview. It was not prepared by an attorney and should not be treated as legal advice.
U. S. Constitution. Like all land use regulations, development exactions, including impact fees, are subject to the 5th Amendment prohibition on taking of private property for public use without just compensation. Both state and federal courts have recognized the imposition of impact fees on development as a legitimate form of land use regulation, provided the fees meet standards intended to protect against “regulatory takings.” A regulatory taking occurs when regulations unreasonably deprive landowners of property rights protected by the Constitution.
In two landmark cases dealing with exactions, the U. S. Supreme Court has held that when a government agency requires the dedication of land or an interest in land as a condition of development approval or imposes ad hoc exactions as a condition of approval on a single development project that do not apply to development generally, a higher standard of judicial scrutiny applies. To meet that standard, the agency must demonstrate an "essential nexus" between such exactions and the interest being protected (See Nollan v. California Coastal Commission, 1987) and make an” individualized determination” that the exaction imposed is "roughly proportional" to the burden created by development (See Dolan v. City of Tigard, 1994).
Until recently, it was widely accepted that legislatively enacted impact fees that apply to all development in a jurisdiction are not subject to the higher standard of judicial scrutiny flowing from the Nollan and Dolan decisions. But after the U. S. Supreme Court decision in Koontz v. St.
Johns Water Management District (2013), state courts have reached conflicting conclusions on that issue. The California Supreme Court has held that the heightened scrutiny required by Nollan and Dolan does not apply to development fees that are generally applicable to a broad class of property owners through legislation (see the opinion in the California Court of Appeal, Third Appellate District, case of Sheetz v. County of El Dorado).
For purposes of this study, we assume that the key distinction between the heightened scrutiny of Nollan and Dolan, and the “reasonable relationship” requirements of the California Mitigation Fee Act (discussed below) is that legislatively adopted impact fees do not require an
City of Covina Page 1-2
Development Impact Fee Study
July 7, 2023
“individualized determination” as to the nature and extent of the impacts of a particular development project and the proportionality of the fees. Otherwise, we consider the reasonable relationship requirements of the Mitigation Fee Act to be generally consistent with the broad nexus standard enunciated in various federal and state impact fee decisions.
Defining “Nexus.” While courts have not been entirely consistent in defining the nexus required to justify exactions and impact fees, that term can be thought of as having the three elements discussed below. We think proportionality is logically included as one element of that nexus, even though it was discussed separately in Dolan v. Tigard. The elements of the nexus discussed below mirror the three “reasonable relationship” findings required by the Mitigation Fee Act for establishment and imposition of impact fees.
Need or Impact. Development must create a need for the facilities to be funded by impact fees.
All new development in a community creates additional demands on some or all public facilities provided by local government. If the capacity of facilities is not increased to satisfy the additional demand, the quality or availability of public services for the entire community will deteriorate.
Impact fees may be used to recover the cost of development-related facilities, but only to the extent that the need for facilities is related to the development project subject to the fees.
The Nollan decision reinforced the principle that development exactions may be used only to mitigate impacts created by the development projects upon which they are imposed. In this study, the impact of development on facility needs is analyzed in terms of quantifiable relationships between various types of development and the demand for public facilities based on applicable level-of-service standards. This report contains all of the information needed to demonstrate compliance with this element of the nexus.
Benefit. Development must benefit from facilities funded by impact fees. With respect to the benefit relationship, the most basic requirement is that facilities funded by impact fees be available to serve the development paying the fees. A sufficient benefit relationship also requires that impact fee revenues be segregated from other funds and expended in a timely manner on the facilities for which the fees were charged. Nothing in the U.S. Constitution or California law requires that facilities paid for with impact fee revenues be available exclusively to development projects paying the fees.
Procedures for earmarking and expenditure of fee revenues are mandated by the Mitigation Fee Act, as are procedures to ensure that the fees are either expended in a timely manner or refunded. Those requirements are intended to ensure that developments benefit from the impact fees they are required to pay. Thus, over time, procedural issues as well as substantive issues can come into play with respect to the benefit element of the nexus.
Proportionality. Impact fees must be proportional to the impact created by a particular development project. Proportionality in impact fees depends on properly identifying development-related facility costs and calculating the fees in such a way that those costs are allocated in proportion to the facility needs created by different types and amounts of development. The section on impact fee methodology, below, describes methods used to allocate facility costs and calculate impact fees that meet the proportionality standard.
City of Covina Page 1-3
Development Impact Fee Study
July 7, 2023
California Constitution. The California Constitution grants broad police power to local governments, including the authority to regulate land use and development. That police power is the source of authority for local governments in California to impose impact fees on development. Some impact fees have been challenged on grounds that they are special taxes imposed without voter approval in violation of Article XIIIA. However, that objection is valid only if the fees charged to a project exceed the cost of providing facilities needed to serve the project.
In that case, the fees would also run afoul of the U. S. Constitution and the Mitigation Fee Act.
Articles XIIIC and XIIID, added to the California Constitution by Proposition 218 in 1996, require voter approval for some “property-related fees,” but exempt “the imposition of fees or charges, as a condition of property development.” Thus, impact fees are exempt from those requirements.
The Mitigation Fee Act. California’s impact fee statute originated in Assembly Bill 1600 during the 1987 session of the Legislature and took effect in January 1989. AB 1600 added several sections to the Government Code, beginning with Section 66000. Since that time, the impact fee statute has been amended from time to time, and in 1997 was officially titled the “Mitigation Fee Act.” Unless otherwise noted, code sections referenced in this report are from the Government Code.
The Mitigation Fee Act does not limit the types of capital improvements for which impact fees may be charged. It defines public facilities very broadly to include "public improvements, public services and community amenities." Although the issue is not specifically addressed in the Mitigation Fee Act, it is clear both in case law and statute (see Government Code Section 65913.8) that impact fees may not be used to pay for ongoing maintenance or operating costs.
Consequently, the fees calculated in this report are based on the cost of capital assets only.
The Mitigation Fee Act does not use the term “mitigation fee” except in its official title. Nor does it use the common term “impact fee.” The Act simply uses the word “fee,” which is defined as “a monetary exaction, other than a tax or special assessment…that is charged by a local agency to the applicant in connection with approval of a development project for the purpose of defraying all or a portion of the cost of public facilities related to the development project ….” To avoid confusion with other types of fees, this report uses the widely accepted terms “impact fee” and “development impact fee” which both should be understood to mean “fee” as defined in the Mitigation Fee Act.
The Mitigation Fee Act contains requirements for establishing, increasing and imposing impact fees. They are summarized below. It also contains provisions that govern the collection and expenditure of fees and requires annual reports and periodic re-evaluation of impact fee programs. Those administrative requirements are discussed in the implementation chapter of this report.
Required Findings. Section 66001 (a) requires that an agency establishing, increasing or imposing impact fees, must make findings to:
1. Identify the purpose of the fee
2. Identify the use of the fee; and
City of Covina Page 1-4
Development Impact Fee Study
July 7, 2023
3. Determine that there is a reasonable relationship between the use of the fee and the development type on which it is imposed
4. Determine that there is a reasonable relationship between the need for the facility and the type of development on which the fee is imposed In addition, Section 66001 (b) requires that in any action imposing a fee as a condition of approval of a development project by a local agency, the local agency shall determine how there is a reasonable relationship between the amount of the fee and the cost of the public facility or portion of the public facility attributable to the development on which the fee is imposed.
Legal experts have opined that the requirements of Section 66001 (a) apply when impact fees are based on a legislatively adopted fee schedule, while the requirements of Section 66001 (b) apply when impact fees are based on an administratively imposed (ad hoc) assessment. 1 The requirements outlined above are discussed in more detail below.
Identifying the Purpose of the Fees. The broad purpose of impact fees is to protect public health, safety and general welfare by providing for adequate public facilities. The specific purpose of the fees calculated in this study is to fund acquisition or construction of certain capital assets that will be needed to mitigate the impacts of planned new development on City facilities, and to maintain an acceptable level of public services as the City grows.
This report recommends that findings regarding the purpose of an impact fee should define the purpose broadly, as providing for the funding of adequate public facilities to serve additional development.
Identifying the Use of the Fees. According to Section 66001(a)(2), if a fee is used to finance public facilities, those facilities must be identified. A capital improvement plan may be used for that purpose but is not mandatory if the facilities are identified in a General Plan, a Specific Plan, or in other public documents. Section 66002 (b) requires that if a capital improvement plan is used to identify the facilities, it must be updated annually.
However, a new provision in Section 66016.5, which was added by AB 602 in 2021, requires that large jurisdictions adopt a capital improvement plan as part of an impact fee study. That requirement applies to impact fee studies adopted after January 1, 2022. “Large jurisdiction” means a county of 250,000 or more or any city within that county. The statute does not provide any detail about what must be included in the capital improvement plan or how it should relate to the impact fee study. That new requirement is inconsistent with the original language of Section 66001(a)(2), so it is unclear whether the annual update requirement in Section 66002(b) applies.
1 See “The Mitigation Fee Act’s Five-Year Findings Requirement: Beware Costly Pitfalls” by Glen Hansen, Senior Council, Abbott and Kindermann and Rick Jarvis, Managing Partner, Jarvis, Fay and Gibson, presented at the 2022 League of California Cities City Attorneys Spring Conference
City of Covina Page 1-5
Development Impact Fee Study
July 7, 2023
Reasonable Relationship Requirement. As discussed above, Section 66001 requires that, for fees subject to its provisions, a "reasonable relationship" must be demonstrated between:
1. the use of the fee and the type of development on which it is imposed;
2. the need for a public facility and the type of development on which a fee is imposed; and,
3. the amount of the fee and the facility cost attributable to the development on which the fee is imposed.
Technically, as best we can determine, the third requirement in that list pertains only to “ad hoc” fees that are not part of a legislatively adopted fee schedule. However, it is reasonable to assume that all three are part of a complete “nexus” or “reasonable relationship” framework as discussed earlier and impact fees calculated in this report are based on a proportional allocation of eligible costs to various types of development.
Development Agreements and Reimbursement Agreements. The requirements of the Mitigation Fee Act do not apply to fees collected under development agreements (see Govt. Code Section 66000) or reimbursement agreements (see Govt. Code Section 66003). The same is true of fees in lieu of park land dedication imposed under the Quimby Act (see Govt. Code Section 66477).
Existing Deficiencies. In 2006, Section 66001(g) was added to the Mitigation Fee Act (by AB 2751) to clarify that impact fees “shall not include costs attributable to existing deficiencies in public facilities,…” The legislature’s intent in adopting this amendment, as stated in the bill, was to codify the holdings of Bixel v. City of Los Angeles (1989), Rohn v. City of Visalia (1989), and Shapell Industries Inc. v. Governing Board (1991).
That amendment does not appear to be a substantive change. It is widely understood that other provisions of law make it improper for impact fees to include costs for correcting existing deficiencies.
However, Section 66001(g) also states that impact fees “may include the costs attributable to the increased demand for public facilities reasonably related to the development project in order to (1) refurbish existing facilities to maintain the existing level of service or (2) achieve an adopted level of service that is consistent with the general plan.” (Emphasis added.) Impact Fees for Existing Facilities. Impact fees may be used to recover costs for existing facilities to the extent that those facilities are needed to serve additional development and have the capacity to do so. In other words, it must be possible to show that fees used to pay for existing facilities meet the need and benefit elements of the nexus.
Recent Legislation
Several new laws enacted by the State of California since 2019 to facilitate development of affordable housing bear on the implementation of impact fees calculated in this study. Below are brief overviews of some key bills passed since 2019.
SB 330 – The Housing Crisis Act of 2019. Amendments to existing law contained in SB 330 prohibit the imposition of new approval requirements on a housing development project once a
City of Covina Page 1-6
Development Impact Fee Study
July 7, 2023
preliminary application has been submitted. That provision applies to increases in impact fees and in-lieu fees, except when the resolution or ordinance establishing the fee authorizes automatic, inflationary adjustments to the fee or exaction.
AB 1483 – Housing Data: Collection and Reporting. AB 1483 requires that a city, county or special district must post on its website a current schedule of its fees and exactions, as well as associated nexus studies and annual reports. Updates must be posted within 30 days.
SB 13 – Accessory Dwelling Units. SB 13 prohibits the imposition of impact fees on accessory dwelling units (ADUs) smaller than 750 square feet and provides that impact fees for ADUs of 750 square feet or more must be proportional to the square footage of the primary dwelling unit. The proportionality requirement means that impact fees for ADUs of 750 square feet or more must be calculated on a case-by-case basis during the approval process.
Existing law requires a water or sewer connection fee or capacity charge for an accessory dwelling unit requiring a new or separate utility connection to be based on either the accessory dwelling unit’s size or the number of its plumbing fixtures. SB 13 revises the basis for calculating the connection fee or capacity charge to either the accessory dwelling unit’s square feet or the number of its drainage fixture units.
AB 602 – Amendments to the Planning and Land Use Law and the Mitigation Fee Act. AB 602, which was passed and signed in 2021, adds section 65940.1 to the Planning and Land Use Law requiring cities, counties and special districts that have internet websites to post schedules of fees, exactions and affordability requirements, annual fee reports, and an archive of nexus studies on that website, and to update that information within 30 days after any changes.
AB 602 also adds Section 66016.5 to the Mitigation Fee Act imposing several new requirements for impact fees that go into effect in 2022, including:
A nexus study must identify the existing level of service for each facility, identify the proposed new level of service (if any), and explain why the new level of service is appropriate.
If a nexus study supports an increase in an existing fee the local agency shall review the assumptions of the nexus study supporting the original fee and evaluate the amount of the fees collected under the original fee.
Large jurisdictions (counties over 250,000 and cities within those counties) must adopt a capital improvement plan as part of the nexus study.
All impact fee nexus studies shall be adopted at a public hearing with at least 30 days’ notice, and the local agency shall notify any member of the public that requests notice of intent to begin and impact fee nexus study of the date of the hearing. Nexus studies shall be updated at least every eight years, from the period beginning on January 1, 2022.
A nexus study adopted after July 1, 2022, shall calculate a fee imposed on a housing development project proportionately to the square footage of proposed units in the
City of Covina Page 1-7
Development Impact Fee Study
July 7, 2023
development. A nexus study is not required to comply with this requirement if the local agency makes certain findings specified in the law. A local agency that imposes a fee proportionately to the square footage of units in the development shall be deemed to have used a valid method to establish a reasonable relationship between the fee charged and the burden posed by the development.
Authorizes any member of the public, including an applicant for a development project, to submit evidence that impact fees proposed by an agency fail to comply with the Mitigation Fee Act, and requires the legislative body of the agency to consider such evidence and adjust the proposed fee if deemed necessary.
Impact Fee Calculation Methodology
Any one of several legitimate methods may be used to calculate impact fees. The choice of a particular method depends primarily on the service characteristics of, and planning requirements for, the type of facility being addressed. To some extent those methods are interchangeable, because they all allocate facility costs in proportion to the needs created by development.
Allocating facility costs to various types and amounts of development is central to all methods of impact fee calculation. Costs are allocated by means of formulas that quantify the relationship between development and the need for facilities. In a cost allocation formula, the impact of development represented by some attribute of development such as added population or added vehicle trips that represent the impacts created by different types and amounts of development.
Plan-Based or Improvements-Driven Method. Plan-based impact fee calculations are based on the relationship between a specified set of improvements and a specified increment of development. The improvements are typically identified in a facility plan, while the development is identified in a land use plan that forecasts potential development by type and quantity.
Using this method, facility costs are allocated to various categories of development in proportion to the service demand created by each type of development. To calculate plan-based impact fees, it is necessary to determine what facilities will be needed to serve a particular increment of new development.
With this method, the total cost of eligible facilities is divided by total units of additional demand to calculate a cost per unit of demand (e.g. a cost per capita for parks). Then, the cost per unit of demand is multiplied by factors representing the demand per unit of development (e.g. population per unit) to arrive at a cost per unit of development.
This method is somewhat inflexible in that it is based on the relationship between a specific facility plan and a specific land use plan. If either plan changes significantly the fees will have to be recalculated.
Capacity-Based or Consumption-Driven Method. This method calculates a cost per unit of capacity based on the relationship between total cost and total capacity of a system. It can be applied to any type of development, provided the capacity required to serve each increment of development can be estimated and the facility has capacity available to serve the development.
City of Covina Page 1-8
Development Impact Fee Study
July 7, 2023
Since the cost per unit of demand does not depend on the particular type or quantity of development to be served, this method is flexible with respect to changing development plans.
In this method, the cost of unused capacity is not allocated to development. Capacity-based fees are most commonly used for water and wastewater systems, where the cost of a system component is divided by the capacity of that component to derive a unit cost. However, a similar analysis can be applied to other types of facilities. To produce a schedule of impact fees based on standardized units of development (e.g. dwelling units or square feet of non-residential building area), the cost per unit of capacity is multiplied by the amount of capacity required to serve a typical unit of development in each of several land use categories.
Standard-Based or Incremental Expansion Method. Standard-based fees are calculated using a specified relationship or standard that determines the number of service units to be provided for each unit of development. The standard can be established as a matter of policy or it can be based on the level of service being provided to existing development in the study area.
Using the standard-based method, costs are defined on a generic unit-cost basis and then applied to development according to a standard that sets the number of service units to be provided for each unit of development.
Park in-lieu and impact fees are commonly calculated this way. The level of service standard for parks is typically stated in terms of acres of parks per thousand residents. A cost-per-acre for park land or park improvements can usually be estimated without knowing the exact size or location of a particular park. The ratio of park acreage to population and the cost per acre for parks is used to calculate a cost per capita. The cost per capita can then be converted into a cost per unit of development based on the average population per dwelling unit for various types of residential development.
Facilities Addressed in this Study
Impact/in-lieu fees for the following types of facilities are addressed in this report:
Park Land and Park Improvements
Recreation Facilities
Library
General Government Facilities
Police Facilities
Fire Facilities
Streets and Traffic Signals
Each of those facilities is addressed in a separate chapter of this report, beginning with Chapter
3. Chapter 2 contains data on existing and future development used in the impact fee analysis.
City of Covina Page 2-1
Development Impact Fee Study
July 7, 2023
Chapter 2. Development Data
This chapter presents data on existing and future development that will be used to calculate impact fees in subsequent chapters of this report. The information in this chapter may be used to establish levels of service, analyze facility needs, and allocate the cost of capital facilities among various types of development.
Land use and development data in this chapter are based on information from the U.S. Census Bureau and the American Community Survey (ACS), the California Department of Finance (DOF) Demographic Research Unit, the City of Covina Community Development Department and other sources as noted in this chapter.
Study Area and Time Frame
The study area for this study is the area within the current boundaries of the City of Covina. No specific timeframe for future development is defined in this study because the City is largely built out and there is considerable uncertainty about the timing of future redevelopment and infill development in Covina. The methods used to calculate impact fees in this report do not depend on the timing of future development. However, those impact fees are based on current facility costs and should be adjusted periodically to keep pace with changes in those costs.
Development Types
The development types for which impact fees are calculated in this study are listed below.
Traditionally, impact fees for residential development are based on unit types such as singlefamily, multi-family and mobile home units. However, AB 602, enacted in 2021, added Section 66016.5 to the Government Code. That section requires that, “[a] nexus study adopted after July 1, 2022, shall calculate a fee imposed on a housing development project proportionately to the square footage of proposed units of the development.” It further states that “[a] local agency that imposes a fee proportionately to the square footage of the proposed units of the development shall be deemed to have used a valid method to establish a reasonable relationship between the fee charged and the burden posed by the development.” Consequently, the residential development categories used in this study are based on unit size rather than the type of unit. The list of development categories used in this study is shown below.
Residential: < 600 Sq. Ft.
Residential: 600 – 800 Sq. Ft.
Residential: > 800 – 1,200 Sq. Ft.
Residential: > 1,200 – 1,900 Sq. Ft.
Residential: > 1,900 – 2,300 Sq. Ft.
Residential: > 2,300 Sq. Ft.
Commercial
Office
Industrial
Public Facilities
City of Covina Page 2-2
Development Impact Fee Study
July 7, 2023
Residential. The residential development categories used in this study are based on unit size and do not distinguish by unit type (e.g., single-family or multi-family).
Commercial. The Commercial category includes all types of commercial uses described in the Land Use Element of the Covina General Plan other than development limited to administrative and professional office uses.
Office. The Office category includes only development that is limited to administrative and professional office uses.
Industrial. The Industrial category includes industrial uses described in the Land Use Element of the Covina General Plan.
Public/Quasi-Public Facilities. This category includes government buildings and other public or quasi-public facilities, parks and public schools. In many cases, the City may lack authority to charge impact fees to development in this category or, in the case of City facilities, it would be impractical to do so. Consequently, Some other types of development, such as hospitals, churches and private schools are also covered by this category. Those developments are not legally exempt from impact fees, but those development types may not fit well into any of the defined development types in the impact fee schedules in this report. Impact fees for specific projects that do not fit any of the development types defined in this study can be calculated on an individual basis using information shown in the bottom rows in Tables S.1 and S.2.
Residential Development and Population
The chart at right shows the
California Department of Finance
(DOF) official January 1
population estimates for Covina
for the years from 2012 through
2022, except for 2020 which
shows the 2020 Census count.
It is evident from this chart that
DOF estimates from 2013 to
2019, which showed a flat
population during that period,
underestimated growth in
Covina. The sudden jump in
population for 2020 is based on the 2020 Census count. It is unclear why DOF estimates for 2021 and 2022 are lower than the 2020 Census population. Overall, the chart shows that Covina’s population has grown by around 2,000 from 2012 to 2022. That is a 4.2% increase or about 0.4% per year.
City of Covina Page 2-3
Development Impact Fee Study
July 7, 2023
Units of Development
In this study, quantities of existing and planned development are measured in terms of certain units of development. Those units are discussed below.
Dwelling Units. Residential development is measured in terms of dwelling units (DUs).
Building Area. Non-residential development in this study is measured in terms of building area in thousands of square feet, denoted as KSF.
Demand Variables
In calculating impact fees, the relationship between facility needs and development must be quantified in cost allocation formulas. Certain measurable attributes of development such as population, vehicle trips or police department calls for service are used in those formulas to reflect the impact of different types and amounts of development on the demand for specific public services and the facilities that support those services.
Those attributes are referred to in this study as “demand variables.” Demand variables are selected either because they directly measure service demand created by various types of development, or because they are reasonably correlated with that demand.
For example, the service standard for parks in a community is typically defined as a ratio of park acreage to population. As population grows, more parks are needed to maintain the desired standard. Logically, then, population is an appropriate yardstick or demand variable for measuring the impacts of development on the need for additional parks.
Each demand variable has a specific value for each type of development. Those values may be referred to as “demand factors.” For example, each of the residential unit size categories used in this study is associated with a specific population per unit Specific demand variables used in this study are discussed below. The values of demand factors used in this report are shown in Table 2.1 on page 2-5.
Population. Resident population is used in this study as a measure of the impact of development on facilities like parks, recreation facilities and libraries that are intended to serve residents of the City. Resident population is tied only to residential development, so it is not useful in measuring demand from non-residential development.
Service Population. Because population alone only represents demand created by residential development, it is not useful in measuring the impacts of development on facilities like City Hall and the City Yard facilities that experience demand from both residential and non-residential development. In this study, a variable called service population is used for that purpose.
Service population is a composite variable that includes both residents of Covina and employees of businesses in the City. Resident population is included to represent the impacts of residential development. Employees are included to represent the impacts of non-residential uses, such as commercial, office and industrial development.
City of Covina Page 2-4
Development Impact Fee Study
July 7, 2023
Because the impact of one new resident is not necessarily the same as the impact of one new employee, various components of the service population are weighted to reflect their relative impacts on demand for certain types of facilities.
Service population is intended to approximate the number of people creating a demand for service on an average day. It is difficult to estimate that number precisely for several reasons.
Some residents work in the City, some residents commute to work outside the City, and some residents don’t work at paid jobs. In addition, non-residents may be present in the City for work, shopping, recreation, or any number of other reasons.
In this study, residents are assigned a weight of 1.0. Our estimate of the average number of hours per week that residents spend in the City is based in part on an analysis of Census Bureau data on how many residents work in the city, how many commute to work outside the City. We assume the average resident spends eight hours a week outside the City for activities like shopping and recreation.
American Community Survey (ACS) data for 2020 (the most recent available year) show that 67% of Covina residents between ages 16 and 64 are employed. ACS data also indicate that about 73% of employed residents work outside the City.
Assuming that out-commuters spend 47.5 hours a week (9.5 hours per day) outside the City for work and commuting, and that all residents spend an average of eight hours a week outside the City for shopping and recreation leads us to the conclusion that out-commuters spend an average of 112.5 (168 – 47.5 - 8 = 112.5) hours per week in the City. Assuming that other residents spend 160 (168 – 8 = 160) hours per week in the City, the weighted average of hours per week in the City for all residents is 141.7. Dividing that number by 168 hours per week gives us a weight of
0.843 for all residents (population) of the City.
Service population weights for employees associated with different types of development are based on estimates of the number of hours per week businesses of a certain type are in operation. This study assumes that retail and service commercial businesses operate 12 hours a day, 7 days a week (84 hours). For professional offices, industrial uses and public facilities, that number is estimated to be 45 hours (9 hours a day, 5 days a week). The weights assigned to employees of businesses associated with various types of non-residential development are based on the hours per week of operation divided by 168 total hours per week. The hours per week for each development type, as well as the weighting factor for each type of development are shown in Exhibit 2A below.
Those weights are intended to allow a balanced allocation of costs among non-residential development types. However, in our estimation those base weights would understate the overall impact of non-residential development on the City’s daytime population. So, in consultation with City staff, we have applied a factor of 1.7 to all non-residential service population weights, which brings the non-residential share of existing service population to 22.7% of the total. That percentage is an indicator of how facility costs will be shared between residential and nonresidential development in the impact fee analysis.
City of Covina Page 2-5
Development Impact Fee Study
July 7, 2023
Finally, for simplicity, all of the service population weights are normalized by dividing them by the residential base weight of 0.843 so that the normalized weight for residents equals 1.0 (0.843 / 0.843 = 1.0) and weights for the non-residential components of service population are increased proportionately. The service population weights used in this study are shown in Exhibit 2A.
Service population per unit factors based on the normalized service population weights and the number of employees per unit are shown in Table 2.1.
Police and Fire Calls for Service. The impact of development on the City’s police and fire facilities is measured by the number of calls for service per unit per year for each development type. Those calls-for-service-per-unit factors are calculated using a random sample of 2021 calls for service to determine the distribution of calls by development type. Then the number of 2021 calls for each type of development is divided by the number of existing units for that type of development to arrive at factors representing calls per unit per year. For additional detail, see Chapter 7 (Police) and Chapter 8 (Fire).
Note on Impact Fees for Accessory Dwelling Units (ADUs). Recent amendments to Section 65852.2 of the Government Code provide that impact fees may not be imposed on ADUs smaller than 750 square feet. It also establishes the following requirement for impact fees imposed on ADUs of 750 square feet or more:
“Any impact fees charged for an accessory dwelling unit of 750 square feet or more shall be charged proportionately in relation to the square footage of the primary dwelling unit.” Although it is not spelled out in Section 65852.2, we think it is obvious that when calculating ADU impact fees in cases where the primary unit is a single-family detached unit, the starting point for the proportionality calculation is the fee that applies to the single-family unit.
Exhibit 2A: Service Population Weights
Development Avg Hrs Total Hrs BaseSvc Pop Scaling Scaled Svc Normalized Type per Wk per Week Weight 1Factor 2 Pop Weight 3Svc Pop Wt 4 Residential 141.7 168.0 0.843 1.00 0.843 1.000
Commercial 84.0 168.0 0.500 1.70 0.850 1.008
Office 45.0 168.0 0.268 1.70 0.455 0.540
Industrial 45.0 168.0 0.268 1.70 0.455 0.540
Public Facilities 45.0 168.0 0.268 1.70 0.455 0.540
1 Base service population weight = average hours per week / total hours per week 2 Scaling factor is used to bring non-residential service population into alignment with non-residential demand for City services; see text for further discussion 3 Scaled service population weight = base service population weight X scaling factor 4 Service population weight normalized to residential service population weight = scaled service population weight / residential service population weight
City of Covina Page 2-6
Development Impact Fee Study
July 7, 2023
The law also allows for ADUs on lots or parcels where the primary units are multi-family units. There are two potential complications for ADUs in multi-family complexes. The first is that the existing units in a multi-family complex may be of different sizes, which makes it more difficult to determine what square footage should be used for the primary unit when calculating the proportional fee for an ADU. The second is that the ADU may be similar in size to the existing units, which means that proportional impact fees for any ADU larger than 750 square feet would not benefit from a significant reduction in impact fees. The City would have to establish a policy as to the primary unit square footage that would apply for ADUs in multi-family projects. One possibility would be to use the average size of existing units in the complex.
Another would be to base the primary unit square footage on the largest unit in the complex, which would have the effect of reducing the ADU impact fee.
The formula for calculating proportional ADU impact fees would be:
Primary unit impact fee X (ADU square feet / Primary unit square feet) One thing that becomes obvious in that formula is that, for an ADU of a particular size, a larger primary unit results in lower impact fees for the ADU. For example, if the ADU is 1,000 square feet and the primary unit is 2,000 square feet, the proportional impact fee for the ADU would be 50% of the impact fee that would apply to the primary unit. But if the primary unit is 1,200 square feet, the impact fee for the same-sized ADU would be 83.33% of the primary unit fee.
It seems likely that discrepancy is an unintended consequence of language in Section 65852.2 that was not thoroughly considered before adoption. It is also worth noting that impact fee studies adopted after July 1, 2022, must comply with a provision of AB 602 that requires impact fees for all types of residential units to be proportionate to the square footage of a unit. Impact fees based on square footage for primary units will tend to reduce the inequity created by the proportionality language of Section 65852.2 because the fees that apply to a smaller primary unit would be less than the fees that apply to a larger primary unit.
In cases where primary units are permitted within multi-family complexes, the same formula would apply, but since existing units may be of different sizes, the City will have to adopt a policy to determine how the primary unit size will be determined. Two possibilities are discussed earlier in this section.
Demand Factors
Exhibit 2B shows how population-per-unit factors were estimated for residential unit size categories used in this study. The Census Bureau and Department of Finance collect data on population per unit, by unit type (e.g., single-family or multi-family) rather than by unit size.
Consequently, we must estimate the population per unit for unit size categories.
Exhibit 2B shows the population per unit factors for the unit size categories used in this study.
Those factors were estimated by NBS using data on the distribution of units by number of bedrooms from the American Community Survey (ACS) and were checked against ACS data on the distribution of household sizes in Covina. The estimated population per unit for each category
City of Covina Page 2-7
Development Impact Fee Study
July 7, 2023
is adjusted so that, (1) the population per unit increases with unit size, and (2) the average population per unit and total population remain approximately the same as for the original data.
The population and number of units in this data set are slightly different from the 2022 numbers shown in Table 2.2, but those differences are not significant for this purpose.
Table 2.1 shows the demand factors used for each type of development defined in this study.
Those factors include the population-per-unit factors from Exhibit 2B as well as employees per unit, service population per unit, peak hour trips per unit per day and police and fire calls per unit per year.
It should be noted that it is not possible to get data on specific rates of peak hour trips or police and fire calls per unit for each residential unit size category shown in Table 2.1. We have used the rates for single-family and multi-family residential units to establish the limits of the range of rates shown in Table 2.1 for residential uses. Then we set the rates for individual categories within that range so that they increase from the smallest to the largest units.
Exhibit 2B: Population per Unit by Unit Size
Unit Size No. of No. of % of Est Pop Population
in Sq Ft 1
Bedrooms Units 2Units per Unit 3
by Unit Size 4
<600 0 368 2.3% 1.00 368
600-800 1 2,186 13.7% 1.35 2,951
>800 - 1,200 2 4,133 26.0% 2.25 9,299
>1,200 - 1,900 3 6,149 38.6% 3.55 21,829
>1,900 - 2,300 4 2,828 17.8% 4.75 13,433
>2,300 5+ 256 1.6% 5.75 1,472
Total/Average 15,920 100.0% 3.10 49,352
1 Estimated square-feet-per-unit ranges based on number of bedrooms 2 Distribution of units by number of bedrooms from American Community Survey (ACS) Table B25041, 2020 5-Year Estimates
3 Estimated population per unit used in this study
4 Population by unit size = number of units X estimated population per unit
City of Covina Page 2-8
Development Impact Fee Study
July 7, 2023
Existing and Future Development
Tables 2.2 through 2.4 on the following pages present data on existing and future development in Covina. Data from those tables will be used throughout this report. Table 2.2 on the next page shows existing development as of January 2023.
It is important to note that in Tables 2.2 through 2.4, all residential development is grouped into a single category. Because of recent changes in state law, this study is required to calculate impact fees for unit-size categories rather than for unit types, but we do not have data that would allow us to break out existing and future development into unit-size categories. Nevertheless, impact fees for all types of facilities will be calculated throughout this report for each residential unit size category.
Table 2.1: Demand Factors
Development Unit Pop per Empl per Svc Pop Pk Hr Trips Police Calls Fire Calls Type 1Type 2Unit 3Unit 4per Unit 5per Unit 6per Unit 7per Unit 8 Residential: <600 Sq. Ft. DU 1.00 1.00 0.44 0.87 0.09
Residential: 600-800 Sq. Ft. DU 1.35 1.35 0.56 0.92 0.13 Residential: >800-1,200 Sq. Ft. DU 2.25 2.25 0.70 0.97 0.17 Residential: >1,200-1,900 Sq. Ft. DU 3.55 3.55 0.85 1.02 0.21 Residential: >1,900-2,300 Sq. Ft. DU 4.75 4.75 0.99 1.07 0.25 Residential: >2,300 Sq. Ft. DU 5.75 5.75 1.10 1.12 0.29 Commercial KSF 2.20 2.22 2.29 4.95 0.28
Office KSF 3.00 1.62 1.15 0.40 0.10
Industrial KSF 1.10 0.59 0.41 0.21 0.07
Public/Quasi-Public Facilities KSF 3.00 1.62 1.15 2.33 0.42 1 The square-feet-per-unit ranges shown in this table for residential development include all types of residential development including single-family, multi-family and mobile homes 2 DU = dwelling unit; KSF = 1,000 gross sq ft of building area 3 See Exhibit 2B
4 Employees per unit estimated by NBS based on a 2001 Southern California Association of Governments (SCAG) study of employment densities in the region 5 Service population per unit; see Exhibit 2A
6 Peak hour trips per unit from the Institute of Transportation Engineers (ITE) manual Trip Generation , 11th edition
7 Police Department calls for service per unit per year based on analysis of a random sample of all 2021 calls for service; see discussion in text and in Chapter 7 8 Fire Department calls for service per unit per year based on analysis of a random sample of all 2021 calls for service; see discussion in text and in Chapter 8
City of Covina Page 2-9
Development Impact Fee Study
July 7, 2023
Table 2.3 on the next page presents a forecast of future residential development in the City based on analysis by the Covina Community Development Department. No forecast of future nonresidential development is included here because the City is mostly built out and there is no way to forecast the conversion of existing non-residential development to new uses over time with any certainty. It is important to note that the future development numbers are not used in the impact fee calculations in this report. They are only used to project potential revenue from those impact fees.
Table 2.2: Existing Development January 1, 2023 - City of Covina Development Unit No. of Popu- Emplo- Service Peak Hr Police Calls Fire Calls Type Type 1Units 2lation 3yees
4 Pop 5Trips 6per Year 7per Year 8
All Residential DU 18,183 51,695 51,695 14,546 18,713 3,522 Commercial KSF 2,850 6,270 6,327 6,515 14,097 788
Office KSF 3,647 10,940 5,908 4,194 1,454 365
Industrial KSF 3,359 3,695 1,982 1,377 695 235
Public/Quasi-Public Facilities KSF 596 1,723 966 685 1,391 250 Totals 51,695 22,628 66,878 27,318 36,350 5,160
1 DU = dwelling unit; KSF = 1,000 gross sq ft of building area 2 Number of existing residential units based on the January 2022 CA Department of Finance E-5 report + additional units under construction provided by the Covina Community Development Department; existing non-residential units based on analysis by NBS of the 2022 ESRI Business Summary for Covina with additional 2022 units under construction provided by the Covina Community Development Department 3 Existing household population from 2022 CA Department of Finance E-5 report + added population for 2022 units under construction
4 Existing employees = existing units X employees per unit from Table 2.1 5 Existing service population = existing units X service population per unit from Table 2.1 6 Existing peak hour trips per day = existing units per peak hour trips per unit from Table 2.1 7 Police Department calls for service per unit per year based on analysis of a random sample of all 2021 calls for service; see discussion in text and in Chapter 7
8 Fire Department calls for service per unit per year based on analysis of a random sample of all 2021 calls for service; discussion in text and in Chapter 8
City of Covina Page 2-10
Development Impact Fee Study
July 7, 2023
Table 2.4 shows the total of existing development plus projected future development. As noted above, Table 2.4 does not reflect any future non-residential development beyond 2023.
Growth Potential
The numbers in Table 2.4 represent an increase of about 8% in Covina’s population based on projected future development. That population growth is projected to result in a 5-6% increase in peak hour trips and police and fire calls per year. Again, those numbers do not reflect any increase that may result from future non-residential development.
Table 2.3: Projected Future Development - City of Covina Development Unit No. of Popu- Emplo- Service Peak Hr Police Calls Fire Calls Type Type 1Units 2lation 3yees
4 Pop 5Trips 6per Year 7per Year 8
All Residential DU 1,863 4,192 4,192 1,304 1,807 317
Commercial KSF
Office KSF
Industrial KSF
Public/Quasi-Public Facilities KSF
Totals 4,192 0 4,192 1,304 1,807 317
1 DU = dwelling unit; KSF = 1,000 gross sq ft of building area 2 Added units based on Covina Community Development Department analysis of development potential in the recently adopted mixed use and affordable housing overlay districts 3 Added population = added residential units X population per dwelling unit for 800-1,200 square foot units from Table 2.1
4 Added employees = added non-residential units X employees per unit from Table 2.1 5 Added service population = added units X service population per unit from Table 2.1 6 Added peak hour trips = added units X peak hour trips per unit from Table 2.1 7 Added police calls per year = added units X police calls per unit per year from Table 2.1 8 Added fire calls per year = added units X fire calls per unit per year from Table 2.1 Table 2.4: Existing Development Plus Future Development - City of Covina Development Unit No. of Popu- Emplo- Service Peak Hr Police Calls Fire Calls Type Type 1Units 2lation 3yees
4 Pop 5Trips 6per Year 7per Year 8
All Residential DU 20,046 55,887 55,887 15,850 20,520 3,839 Commercial KSF 2,850 6,270 6,327 6,515 14,097 788
Office KSF 3,647 10,940 5,908 4,194 1,454 365
Industrial KSF 3,359 3,695 1,982 1,377 695 235
Public/Quasi-Public Facilities KSF 596 1,723 966 685 1,391 250 Totals 55,887 22,628 71,070 28,622 38,157 5,477
Note: The figures shown in Table 2.4 represent the sum of the corresponding figures from Tables 2.2 and 2.3
City of Covina Page 2-11
Development Impact Fee Study
July 7, 2023
The fees calculated in subsequent chapters of this report are intended to pay for the capital facilities needed to serve the additional demand created by future development.
All of the fees calculated in this report are based on the cost to maintain the existing level of service for various types of facilities, so that the amount of future development does not affect the impact fee calculations. Future development numbers are used only to project revenue from the impact fees.
City of Covina Page 3-1
Development Impact Fee Study
July 7, 2023
Chapter 3. Park Land and Park Improvements
This chapter calculates impact fees for park land acquisition, park improvements, and park maintenance vehicles and equipment.
As authorized by the Quimby Act (Government Code Section 66477), Chapter 16.28 of the Covina Municipal Code requires that residential subdivisions dedicate land for parks or pay a fee in-lieu of dedication. That chapter contains formulas for determining the amount of land to be dedicated and the amount of any fees to be paid in-lieu of dedication.
However, those requirements apply only to projects that involve a subdivision or parcel map. The park land impact fees calculated in this chapter are intended to apply to residential development that is exempt from the provision of Chapter 16.28 because it does not involve a subdivision or parcel map.
The park improvement impact fees calculated in this chapter, which include the cost of park maintenance vehicles and equipment, are intended to apply to all residential development in the City, in addition to any in-lieu fees or impact fees for park land acquisition.
Methodology
This chapter calculates impact fees using the standard-based method discussed in Chapter 1.
Standard-based fees are calculated using a specified relationship or standard that determines the number of service units to be provided for each unit of development. All of the impact fees calculated in this chapter are based on the City’s existing level of service (LOS) as defined in the section titled Existing Parks and Existing Level of Service, below. Impact fees calculated in that manner are intended to provide the funding needed to maintain the existing level of service as the City grows.
Service Area
The impact fees calculated in this chapter are intended to apply Citywide.
Demand Variable
A “demand variable” is a quantifiable attribute of development that is used in impact fee calculation formulas to represent the impact of development. The demand variable used to calculate impact fees for parks in this chapter is population. Population is used here because the need for parks is almost universally defined in terms of the relationship between population and acres of parks.
Impact fees calculated in this chapter for different categories of residential development vary depending on the estimated average population per unit for each unit-size category. The population per unit factors used to calculate park impact fees are from Table 2.1 in Chapter 2.
Because population growth is driven by new residential development, the impact fees calculated in this chapter apply only to residential development.
City of Covina Page 3-2
Development Impact Fee Study
July 7, 2023
Existing Parks and Existing Level of Service
In 2021, AB 602 added Section 66016.5 to the Mitigation Fee Act. That section requires, after January 1, 2022, that the level of service used in an impact fee study must be compared with the existing level of service. If the level used in the impact fee study exceeds the existing level of service, an explanation is required. The impact fees calculated in this chapter are based on the existing level of service as shown in Table 3.2, below, so there is no level-of-service issue in the calculation of impact fees in this chapter with respect to Section 66016.5.
Table 3.1 lists the City’s existing parks and shows both City-owned acres and improved acres of parks. In this case, all of the City owned park acreage is improved.
Table 3.2 calculates the City’s existing level of service in terms of acres of improved park land per capita and per 1,000 population.
Table 3.1: Existing Parks
Park Park City-Owned Improved
Name Type Park Acres Park Acres
Covina Park Community 11.15 11.15
Wingate Park Community 17.00 17.00
Hollenbeck Park Community 13.15 13.15
Heritage Plaza Park Community 1.75 1.75
Sunkist Park Community 5.90 5.90
Banna Park Neighborhood 1.97 1.97
Cougar Park Community 1.00 1.00
Edna Park Neighborhood 1.48 1.48
Jobe's Glen at Jalapa Park Community 2.00 2.00
Total 55.40 55.40
Source: City of Covina Parks and Recreation Department
Table 3.2: Existing Level of Service
Total Improved
Park Acres 1
Existing
Population 2
Improved Acres
per Capita 3
Improved Acres
per 1,000 4
55.40 51,695 0.00107 1.07
1 See Table 3.1
2 See Table 2.2
3 Acres per capita = existing acres / existing population 4 Acres per 1,000 population = acres per capita X 1,000
City of Covina Page 3-3
Development Impact Fee Study
July 7, 2023
Existing Park Maintenance Equipment. Table 3.3 lists the City’s existing park maintenance equipment and the replacement cost for each item. The cost of park maintenance equipment will be incorporated into the impact fees for park improvements. Replacement cost is used here to reflect the cost of acquiring the additional equipment that will be needed to maintain additional parks needed to serve new development.
Cost Per Capita
Table 3.4 calculates a cost per capita for both park land acquisition and park improvements based on the existing ratio of park acres per capita from Table 3.2 and the estimated cost per acre of park land and park improvements in Covina. The cost per capita for park improvements also includes the cost of park maintenance vehicles and equipment.
As noted previously, the park land impact fees calculated here apply only to residential development projects that are exempt from the park land dedication or in-lieu fee requirements of Covina Municipal Code Chapter 16.28 because they do not involve a subdivision or parcel map.
The two types of fees for park land acquisition may differ in amount because the Quimby Act allows in-lieu fees for park land acquisition to be based on at least 3.0 acre per 1,000 population, which exceeds the existing level of service used to calculate park land impact fees in this chapter.
Table 3.3: Existing Park Maintenance Vehicles & Equipment Description
Model
Year
Replacement
Cost 1
Small Trailer 1963 12,000.00$
2003 GMC 2500HD PU 2003 45,000.00$
2004 Toro GM4000 4WD Mower 2004 72,000.00$
2007 GMC 2500HD Classic Sierra 2007 45,000.00$
2014 Ford F250 Super Duty w/ Tommy Lift 2014 45,000.00 $ 2015 Ford F250 Super Duty 2015 45,000.00$
Eagle 40H Lift 2001 65,000.00$
2002 Genie GS-2032 Scissor Lift 2002 39,000.00$
Total 368,000.00$
1 Replacement cost estimated by the City of Covina Public Works Department
City of Covina Page 3-4
Development Impact Fee Study
July 7, 2023
Impact Fees per Unit
Impact Fees per Unit - Park Land Acquisition for Non-Subdivision Projects. Table 3.5 calculates impact fees per unit by residential unit-size category for park land acquisition. Those fees are based on the per-capita cost from Table 3.4 and population per dwelling unit factors from Table
2.1. These fees would apply only to residential development not involving a subdivision.
Impact Fees per Unit - Park Improvements. Table 3.6 calculates impact fees per unit by residential unit-size category for park improvements. These fees incorporate the cost of park maintenance vehicles and equipment. They are calculated using the combined per-capita cost for park improvements and park maintenance equipment from Table 3.4 and the population per unit factors from Table 2.1.
Table 3.4: Cost per Capita - Park Land and Park Improvements Fee Type
Acres per
Capita 1
Cost per
Acre2
Cost per
Capita3
Park Land Acquisition 0.00107 1,150,000$ 1,230.50$
Park Improvements 0.00107 766,643$ 820.31$
1 See Table 3.2
2 Park land acquisition cost based on the actual cost for Banna Park; park improvement cost per acre based on the actual cost for Banna Park ($760,000 per acre) plus the average cost per acre for park maintenance vehicles and equipment shown in Table 3.3
3 Cost per capita = acres per capita X cost per acre
Table 3.5: Park Land Impact Fees per Unit (Non-Subdivision Projects) Development
Type Units 1
Cost per
Capita 2
Population
per DU 3
Impact Fee
per Unit 4
Residential: <600 Sq. Ft. DU $1,230.50 1.00 1,230.50$
Residential: 600-800 Sq. Ft. DU $1,230.50 1.35 1,661.18 $ Residential: >800-1,200 Sq. Ft. DU $1,230.50 2.25 2,768.63$ Residential: >1,200-1,900 Sq. Ft. DU $1,230.50 3.55 4,368.28$ Residential: >1,900-2,300 Sq. Ft. DU $1,230.50 4.75 5,844.88$ Residential: >2,300 Sq. Ft. DU $1,230.50 5.75 7,075.38$ 1 Units of development: DU = dwelling unit
2 See Table 3.4
3 See Table 2.1
4 Impact fee per unit = cost per capita X population per dwelling unit
City of Covina Page 3-5
Development Impact Fee Study
July 7, 2023
Projected Revenue
The impact fees per unit in the two previous tables are based on residential unit size in square feet. Although Table 2.3 in Chapter 2 shows a forecast of total future residential units to 2040, it is not possible to forecast the number of units in each unit-size category. Consequently, potential revenue from impact fees calculated in this chapter is estimated based on the population added by new development and the cost per capita for park land acquisition and park improvements.
Projected Revenue – Park Land Impact Fees. Projecting revenue from park land impact fees is further complicated by the fact that we have no way of knowing how much future residential development will be in subdivisions, which are subject to Quimby Act park land in-lieu fees rather than the park land impact fees calculated in this chapter. Keeping in mind that individually owned multi-family units such as condominiums involve a subdivision, while apartment projects do not, the revenue projection for park land impact fees in Table 3.7 assumes that 25% of future residential units (25% of the added population shown in Table 2.3) will be subject to the park land impact fees calculated in this chapter.
This study does not address park land in-lieu fees, and it would not be possible to project revenue from those fees in any event because the Chapter 16.28 of the Covina Municipal Code requires that they be calculated case-by-case using the fair market value of the land being developed in a particular project.
Table 3.6: Park Improvement Impact Fees per Unit
Development
Type Units 1
Cost per
Capita 2
Population
per DU 3
Impact Fee
per Unit 4
Residential: <600 Sq. Ft. DU $820.31 1.00 820.31$
Residential: 600-800 Sq. Ft. DU $820.31 1.35 1,107.42$
Residential: >800-1,200 Sq. Ft. DU $820.31 2.25 1,845.69$ Residential: >1,200-1,900 Sq. Ft. DU $820.31 3.55 2,912.09$ Residential: >1,900-2,300 Sq. Ft. DU $820.31 4.75 3,896.46$ Residential: >2,300 Sq. Ft. DU $820.31 5.75 4,716.77$
1 Units of development: DU = dwelling unit
2 See Table 3.4; includes combined cost per capita for park improvements and park maintenance vehicles and equipment;
3 See Table 2.1
4 Impact fee per unit = cost per capita X population per dwelling unit
City of Covina Page 3-6
Development Impact Fee Study
July 7, 2023
Projected Revenue – Park Improvement Impact Fees. Table 3.8 calculates projected revenue for the park improvement impact fees, using the cost per capita from Table 3.4 and the added population from Table 2.3.
Updating the Fees
The impact fees calculated in this chapter are based the current estimated cost of park land and park improvements. We recommend that the fees be reviewed annually and adjusted as needed using local cost data or an index such as the Engineering News Record Construction Cost Index (CCI). See the Implementation Chapter for more on indexing of fees.
Nexus Summary
As discussed in Chapter 1 of this report, Section 66001 of the Mitigation Fee Act requires that an agency establishing, increasing or imposing impact fees, must make findings to:
Identify the purpose of the fee;
Identify the use of the fee; and,
Determine that there is a reasonable relationship between:
a. The use of the fee and the development type on which it is imposed; b. The need for the facility and the type of development on which the fee is imposed; and
Table 3.7: Projected Revenue from Park Land Impact Fees Development Impact Fee Added Projected
Type per Capita 1
Population 2Revenue 3
All Residential $1,230.50 1,048 1,289,564$
Total 1,289,564$
1 See Table 3.4
2 Added population from Table 2.3 X 0.25
3 Projected revenue = impact fee per capita X added population Table 3.8: Projected Revenue from Park Improvement Impact Fees Development Impact Fee Added Projected
Type per Capita 1
Population 2Revenue 3
All Residential $820.31 4,192 3,438,524$
Total 3,438,524$
1 See Table 3.4
2 See Table 2.3
3 Projected revenue = impact fee per capita X added population
City of Covina Page 3-7
Development Impact Fee Study
July 7, 2023
c. The amount of the fee and the facility cost attributable to the development project.
Satisfying those requirements also ensures that the fees meet the “rational nexus” and “rough proportionality” standards enunciated in leading court decisions bearing on impact fees and other exactions. (For more detail, see “Legal Framework for Impact Fees” in Chapter 1.) The following paragraphs explain how the impact fees calculated in this chapter satisfy those requirements.
Purpose of the Fee: The purpose of the impact fees calculated in this chapter is to mitigate the impact of new residential development on the need for parks in Covina.
Use of the Fee. Impact fees calculated in this chapter will be used to provide additional parks or park improvements to mitigate the impacts of new residential development in the City. As provided by the Mitigation Fee Act, revenue from impact fees may also be used for temporary loans from one impact fee fund or account to another.
Reasonable Relationship between the Use of the Fee and the Development Type on Which It Is Imposed. The impact fees calculated in this chapter will be used to provide additional parks or park improvements to serve the needs of added population associated with new residential development in Covina.
Reasonable Relationship between the Need for the Facilities and the Type of Development on Which the Fee Is Imposed. New development increases the need for parks to maintain the existing level of service as described earlier in this chapter. Without additional park space and improvements, the increase in population associated with new residential development would result in a reduction in the level of service provided to all residents of the City.
Reasonable Relationship between the Amount of the Fee and the Facility Cost Attributable to the Development Project. The amount of the impact fees for park land and park improvements calculated in this chapter depend on the estimated increase in population per unit associated with residential development unit-size category. The fees per unit of development calculated in this chapter for each unit-size category are based on the estimated average population per unit for that type of development in Covina. Thus, the fee charged to a development project reflects the impact of that project on the need for parks in the City.
City of Covina Page 4-1
Development Impact Fee Study
July 7, 2023
Chapter 4. Community and Recreation Centers
This chapter calculates impact fees for community and recreation center facilities.
Methodology
This chapter calculates impact fees using the standard-based method discussed in Chapter 1.
Standard-based fees are calculated using a specified relationship or standard that determines the number of service units to be provided for each unit of development. All of the impact fees calculated in this chapter are based on the City’s existing level of service (LOS) as defined in the section titled Existing Facilities and Existing Level of Service, below. Impact fees calculated in that manner are intended to provide the funding needed to maintain the existing level of service as the City grows.
Service Area
The impact fees calculated in this chapter are intended to apply to all new residential development in the City.
Demand Variable
A “demand variable” is a quantifiable attribute of development that is used in impact fee calculation formulas to represent the impact of development on a particular type of capital facilities. The demand variable used to calculate impact fees for community and recreation center facilities in this chapter is population. Population is used here because the need for community and recreation center facilities is commonly defined on the basis of the population to be served.
Impact fees calculated in this chapter for different categories of residential development vary depending on the estimated average population per unit for each category. The population per unit factors used to calculate impact fees for community and recreation center facilities are from Table 2.1 in Chapter 2.
Because population growth is driven by new residential development, the impact fees calculated in this chapter apply only to residential development.
Existing Facilities and Existing Level of Service
In 2021, AB 602 added Section 66016.5 to the Mitigation Fee Act. That section requires, after January 1, 2022, that the level of service used in an impact fee study must be compared with the existing level of service. If the level used in the impact fee study exceeds the existing level of service, an explanation is required. The impact fees calculated in this chapter are based on the existing level of service as shown in Table 4.2 on the next page, so there is no level-of-service issue in the calculation of impact fees in this chapter with respect to Section 66016.5.
In this chapter, the existing level of service for community and recreation center facilities is based on the relationship between the City’s existing population and the replacement cost of existing community and recreation center facilities. Table 4.1 lists the City’s existing community and recreation center facilities with building replacement cost and the replacement cost of furniture,
City of Covina Page 4-2
Development Impact Fee Study
July 7, 2023
fixtures and equipment (FF&E). The impact fee cost basis for each facility is the sum of the building replacement cost and the replacement cost of FF&E. No land value is included in Table
4.1 because all of the facilities listed in that table are located in City parks.
Table 4.2 calculates the City’s existing level of service as a cost per capita based on the City’s existing population and the impact fee cost basis from Table 4.1.
Impact Fees per Unit
Table 4.3 calculates impact fees per unit by residential development type for community and recreation center facilities. Those fees are based on the per-capita cost from Table 4.2 and population per dwelling unit factors from Table 2.1. These fees would apply only to residential development.
Table 4.1: Existing Community and Recreation Center Facilities Constr Building Bldg Repl FF&E Repl Impact Fee
Facility Location Date Sq Ft 1
Cost 2 Cost 3 Cost Basis 4
Aquatic Center Buildings Covina Park 1962 7,457 1,687,610$ 24,632$ 1,712,242$ Aquatic Center Pools/Equipt Covina Park 1962 N/A 1,400,000$ 1,400,000$ Recreation Hall Covina Park 1930 3,758 973,784$ 35,189$ 1,008,973$ Community Center Cougar Park 2015 1,500 1,485,000$ 15,600$ 1,500,600$ Parks & Recreation Ofc Hollenbeck Park 2000 3,091 790,200$ 100,562$ 890,762$ Senior & Community Center Sunkist Park 2019 10,000 9,750,000$ 98,500$ 9,848,500$ Total 16,361,077$
1 Building square feet from the City's insured property schedule or the Covina Parks and Recreation Dept. 2 Building replacement cost from the City's insured property schedule or the Covina Parks and Recr. Dept. 3 Replacement cost of furniture, fixtures and equipment (FF&E) based on the personal property cost from the City's insured property schedule or the Covina Parks and Recreation Department 4 Impact fee cost basis = building replacement cost + furniture, fixtures and equipment replacement cost Table 4.2: Cost per Capita - Community & Rec Center Facilities Impact Fee
Cost Basis 1
Existing
Population 2
Cost per
Capita 3
$16,361,077 51,695 $316.49
1 See Table 4.1
2 See Table 2.2
3 Cost per capita = impact fee cost basis / existing population
City of Covina Page 4-3
Development Impact Fee Study
July 7, 2023
Projected Revenue
The impact fees per unit in the previous table is based on residential unit size in square feet.
Although Table 2.3 in Chapter 2 shows a forecast of total future residential units to 2040, it is not possible to forecast the number of units in each unit-size category. Consequently, potential revenue from impact fees calculated in this chapter is estimated based on the population added by new development and the cost per capita for park land acquisition and park improvements.
Updating the Fees
The impact fees calculated in this chapter are based the current estimated cost of community and recreation center facilities. We recommend that the fees be reviewed annually and adjusted as needed using local cost data or an index such as the Engineering News Record Construction Cost Index (CCI). See the Implementation Chapter for more on indexing of fees.
Nexus Summary
As discussed in Chapter 1 of this report, Section 66001 of the Mitigation Fee Act requires that an agency establishing, increasing or imposing impact fees, must make findings to:
Identify the purpose of the fee;
Table 4.3: Community and Recreation Facilities Impact Fees per Unit Development
Type Units 1
Cost per
Capita 2
Population
per Unit 3
Impact Fee
per Unit 4
Residential: <600 Sq. Ft. DU $316.49 1.00 316.49$
Residential: 600-800 Sq. Ft. DU $316.49 1.35 427.26$
Residential: >800-1,200 Sq. Ft. DU $316.49 2.25 712.11 $ Residential: >1,200-1,900 Sq. Ft. DU $316.49 3.55 1,123.55$ Residential: >1,900-2,300 Sq. Ft. DU $316.49 4.75 1,503.34$ Residential: >2,300 Sq. Ft. DU $316.49 5.75 1,819.83$
1 Units of development: DU = dwelling unit
2 See Table 4.2
3 See Table 2.1
4 Impact per unit = cost per capita X population per dwelling unit Table 4.4: Projected Revenue - Community/Rec Facilities Impact Fees Development Impact Fee Added Projected
Type per Capita 1
Population 2Revenue 3
All Residential $316.49 4,192 1,326,657$
Total 1,326,657$
1 See Table 4.2
2 See Table 2.3
3 Projected revenue = impact fee per capita X added population
City of Covina Page 4-4
Development Impact Fee Study
July 7, 2023
Identify the use of the fee; and,
Determine that there is a reasonable relationship between:
a. The use of the fee and the development type on which it is imposed; b. The need for the facility and the type of development on which the fee is imposed; and
c. The amount of the fee and the facility cost attributable to the development project.
Satisfying those requirements also ensures that the fees meet the “rational nexus” and “rough proportionality” standards enunciated in leading court decisions bearing on impact fees and other exactions. (For more detail, see “Legal Framework for Impact Fees” in Chapter 1.) The following paragraphs explain how the impact fees calculated in this chapter satisfy those requirements.
Purpose of the Fee: The purpose of the impact fees calculated in this chapter is to mitigate the impact of new residential development on the need for community and recreation center facilities in Covina.
Use of the Fee. Impact fees calculated in this chapter will be used to provide additional community and recreation center facilities to mitigate the impacts of new residential development in the City. As provided by the Mitigation Fee Act, revenue from impact fees may also be used for temporary loans from one impact fee fund or account to another.
Reasonable Relationship between the Use of the Fee and the Development Type on Which It Is Imposed. The impact fees calculated in this chapter will be used to provide additional community and recreation center facilities to serve the needs of added population associated with new residential development in Covina.
Reasonable Relationship between the Need for the Facilities and the Type of Development on Which the Fee Is Imposed. New development increases the need for community and recreation center facilities to maintain the existing level of service as described earlier in this chapter.
Without additional facilities, the increase in population associated with new residential development would result in a reduction in the level of service provided to all residents of the City.
Reasonable Relationship between the Amount of the Fee and the Facility Cost Attributable to the Development Project. The amount of the impact fees for community and recreation center facilities calculated in this chapter depends on the estimated increase in population per unit associated with each category of residential development. The fees per unit of development calculated in this chapter for each type of residential development are based on the estimated average population per unit for that type of development in Covina. Thus, the fee charged to a development project reflects the impact of that project on the need for community and recreation center facilities in the City.
City of Covina Page 5-1
Development Impact Fee Study
July 7, 2023
Chapter 5. Libraries
This chapter calculates impact fees for library facilities and materials.
Methodology
This chapter calculates impact fees using the standard-based method discussed in Chapter 1.
Standard-based fees are calculated using a specified relationship or standard that determines the number of service units to be provided for each unit of development. All of the impact fees calculated in this chapter are based on the City’s existing level of service (LOS) as defined in the section titled Existing Facilities and Existing Level of Service, below. Impact fees calculated in that manner are intended to provide the funding needed to maintain the existing level of service as the City grows.
Service Area
The impact fees calculated in this chapter are intended to apply to all new residential development in the City.
Demand Variable
A “demand variable” is a quantifiable attribute of development that is used in impact fee calculation formulas to represent the impact of development on a particular type of capital facilities. The demand variable used to calculate impact fees for libraries in this chapter is population. Population is used here because the need for libraries is commonly defined on the basis of the population to be served.
Impact fees calculated in this chapter for different categories of residential development vary depending on the estimated average population per unit for each category. The population per unit factors used to calculate impact fees for libraries are shown in Table 2.1 in Chapter 2.
Because population growth is driven by new residential development, the impact fees calculated in this chapter apply only to residential development.
Existing Facilities and Existing Level of Service
In 2021, AB 602 added Section 66016.5 to the Mitigation Fee Act. That section requires, after January 1, 2022, that the level of service used in an impact fee study must be compared with the existing level of service. If the level used in the impact fee study exceeds the existing level of service, an explanation is required. The impact fees calculated in this chapter are based on the existing level of service as shown in Table 5.2 on the next page, so there is no level-of-service issue in the calculation of impact fees in this chapter with respect to Section 66016.5.
In this chapter, the existing level of service for library facilities and materials is based on the relationship between the City’s existing population and the replacement cost of existing facilities and materials. Table 5.1 lists the City’s existing library assets. The library building is shown with the building replacement cost and the replacement cost of furniture, fixtures and equipment (FF&E). The impact fee cost basis is the sum of the building replacement cost and the
City of Covina Page 5-2
Development Impact Fee Study
July 7, 2023
replacement cost of FF&E. The replacement cost of library materials (books and other items) is also shown in Table 5.1.
Table 5.2 calculates the City’s existing level of service as a cost per capita for both library facilities and library materials. The cost per capita for each component is based on the City’s existing population and the impact fee cost basis from Table 5.1.
Impact Fees per Unit
Table 5.3 calculates impact fees per unit by residential development type for library facilities.
Those fees are based on the per-capita cost from Table 5.2 and population per dwelling unit factors from Table 2.1. These fees would apply only to residential development.
Table 5.1: Existing Library Facilities and Materials
Constr Building Bldg Repl Site Site FF&E Repl Impact Fee Facility Date Sq Ft 1
Cost 2 Acres 3Value 4Cost 5 Cost Basis 6
Existing Library Building 1963 23,000 10,350,000$ 0.95 1,092,500$ 4,224,356$ 15,666,856$ Existing Library Materials (102,645 Items @ average cost of $62.95) 6,461,503$ 6,461,503$ Library Impact Fee Fund Balance 188,509$
Total 22,316,868$
1 Existing building square feet from the City's insured property schedule 2 Building replacement cost from the City's insured property schedule 3 Site acreage estimated by NBS
4 Site value based on $1,150,000 per acre
5 Replacement cost of furniture, fixtures and equipment (FF&E) based on the personal property value from the City's insured property schedule; cost of library materials from the Covina Library Services Department 6 Impact fee cost basis = building replacement cost + site value + FF&E replacement cost; impact fee fund balance provided by the City of Covina Finance Department Table 5.2: Existing Level of Service
Cost
Component
Impact Fee
Cost Basis 1
Existing
Population 2
Cost per
Capita 3
Library Facilities 15,800,320$ 51,695 305.65
Library Materials 6,516,548$ 51,695 126.06
Total 22,316,868$ 51,695 431.70
1 See Table 5.1; a prorata share of the impact fee fund balance is added to the impact fee cost basis for each cost component based on the percentage of the total cost of library facilities and materials
2 See Table 2.2
3 Cost per capita = impact fee cost basis / existing population
City of Covina Page 5-3
Development Impact Fee Study
July 7, 2023
Table 5.4 calculates impact fees per unit by residential development type for library materials.
Those fees are based on the per-capita cost from Table 5.2 and population per dwelling unit factors from Table 2.1. These fees would apply only to residential development.
Projected Revenue
The impact fees per unit in the previous table is based on residential unit size in square feet.
Although Table 2.3 in Chapter 2 shows a forecast of total future residential units to 2040, it is not possible to forecast the number of units in each unit-size category. Consequently, potential revenue from impact fees calculated in this chapter is estimated based on the population added by new development and the cost per capita for library facilities and materials.
Projected Revenue – Library Facilities. Table 5.5 calculates projected revenue for the library facilities impact fees, using the cost per capita from Table 5.2 and the added population from Table 2.3.
Table 5.3: Library Facilities Impact Fees per Unit
Development
Type Units 1
Cost per
Capita 2
Population
per Unit 3
Impact Fee
per Unit 4
Residential: <600 Sq. Ft. DU $305.65 1.00 305.65$
Residential: 600-800 Sq. Ft. DU $305.65 1.35 412.62$
Residential: >800-1,200 Sq. Ft. DU $305.65 2.25 687.70 $ Residential: >1,200-1,900 Sq. Ft. DU $305.65 3.55 1,085.04$ Residential: >1,900-2,300 Sq. Ft. DU $305.65 4.75 1,451.81$ Residential: >2,300 Sq. Ft. DU $305.65 5.75 1,757.46$
1 Units of development: DU = dwelling unit
2 See Table 5.2
3 See Table 2.1
4 Impact fee per unit = cost per capita X population per dwelling unit Table 5.4: Library Materials Impact Fees per Unit
Development
Type Units 1
Cost per
Capita 2
Population
per Unit 3
Impact Fee
per Unit 4
Residential: <600 Sq. Ft. DU $126.06 1.00 126.06$
Residential: 600-800 Sq. Ft. DU $126.06 1.35 170.18$
Residential: >800-1,200 Sq. Ft. DU $126.06 2.25 283.63 $ Residential: >1,200-1,900 Sq. Ft. DU $126.06 3.55 447.50$ Residential: >1,900-2,300 Sq. Ft. DU $126.06 4.75 598.77$ Residential: >2,300 Sq. Ft. DU $126.06 5.75 724.83$
1 Units of development: DU = dwelling unit
2 See Table 5.2
3 See Table 2.1
4 Impact fee per unit = cost per capita X population per dwelling unit
City of Covina Page 5-4
Development Impact Fee Study
July 7, 2023
Projected Revenue – Library Materials. Table 5.6 calculates projected revenue for the library materials impact fees, using the cost per capita from Table 5.2 and the added population from Table 2.3.
Updating the Fees
The impact fees calculated in this chapter are based the current estimated cost of library facilities and library materials. We recommend that the fees be reviewed annually and adjusted as needed using local cost data or an index such as the Engineering News Record Construction Cost Index (CCI). See the Implementation Chapter for more on indexing of fees.
Nexus Summary
As discussed in Chapter 1 of this report, Section 66001 of the Mitigation Fee Act requires that an agency establishing, increasing or imposing impact fees, must make findings to:
Identify the purpose of the fee;
Identify the use of the fee; and,
Determine that there is a reasonable relationship between:
a. The use of the fee and the development type on which it is imposed; b. The need for the facility and the type of development on which the fee is imposed; and
c. The amount of the fee and the facility cost attributable to the development project.
Table 5.5: Projected Revenue - Library Facilities Impact Fees Development Impact Fee Added Projected
Type per Capita 1
Population 2Revenue 3
All Residential $305.65 4,192 1,281,188$
Total 1,281,188$
1 See Table 5.2
2 See Table 2.3
3 Projected revenue = impact fee per capita X added population Table 5.6: Projected Revenue - Library Materials Impact Fees Development Impact Fee Added Projected
Type per Capita 1
Population 2Revenue 3
All Residential $126.06 4,192 528,402$
Total 528,402$
1 See Table 5.2
2 See Table 2.3
3 Projected revenue = impact fee per capita X added population
City of Covina Page 5-5
Development Impact Fee Study
July 7, 2023
Satisfying those requirements also ensures that the fees meet the “rational nexus” and “rough proportionality” standards enunciated in leading court decisions bearing on impact fees and other exactions. (For more detail, see “Legal Framework for Impact Fees” in Chapter 1.) The following paragraphs explain how the impact fees calculated in this chapter satisfy those requirements.
Purpose of the Fee: The purpose of the impact fees calculated in this chapter is to mitigate the impact of new residential development on the need for library facilities and materials in Covina.
Use of the Fee. Impact fees calculated in this chapter will be used to provide additional library facilities and library materials to mitigate the impacts of new residential development in the City.
As provided by the Mitigation Fee Act, revenue from impact fees may also be used for temporary loans from one impact fee fund or account to another.
Reasonable Relationship between the Use of the Fee and the Development Type on Which It Is Imposed. The impact fees calculated in this chapter will be used to provide additional library facilities and library materials to serve the needs of added population associated with new residential development in Covina.
Reasonable Relationship between the Need for the Facilities and the Type of Development on Which the Fee Is Imposed. New development increases the need for libraries to maintain the existing level of service as described earlier in this chapter. Without additional library facilities and materials, the increase in population associated with new residential development would result in a reduction in the level of service provided to all residents of the City.
Reasonable Relationship between the Amount of the Fee and the Facility Cost Attributable to the Development Project. The amount of the impact fees for library facilities and library materials calculated in this chapter depends on the estimated increase in population per unit associated with each category of residential development. The fees per unit of development calculated in this chapter for each type of residential development are based on the estimated average population per unit for that type of development in Covina. Thus, the fee charged to a development project reflects the impact of that project on the need for libraries in the City.
City of Covina Page 6-1
Development Impact Fee Study
July 7, 2023
Chapter 6. General Government Facilities
This chapter calculates impact fees for general government facilities, including City Hall and City Yard facilities as well as vehicles and equipment used by general government departments.
Where the term general government facilities is used in this chapter, it should be understood to include general government vehicles and equipment.
Methodology
This chapter calculates impact fees using the standard-based method discussed in Chapter 1.
Standard-based fees are calculated using a specified relationship or standard that determines the number of service units to be provided for each unit of development. All of the impact fees calculated in this chapter are based on the City’s existing level of service (LOS) as defined in the section titled Existing Facilities and Existing Level of Service, below. Impact fees calculated in that manner are intended to provide the funding needed to maintain the existing level of service as the City grows.
Service Area
The impact fees calculated in this chapter are intended to apply to all new development in the City.
Demand Variable
A “demand variable” is a quantifiable attribute of development that is used in impact fee calculation formulas to represent the impact of development on a particular type of capital facilities. The demand variable used to calculate impact fees for general government facilities in this chapter is service population. As discussed in Chapter 2, service population is a composite variable that includes resident population (representing residential development) and employees of businesses in the City (representing non-residential development). The resident and employee components are weighted differently in the overall service population. See Chapter 2 for more on the weighting of those components.
Impact fees calculated in this chapter for different categories of development vary depending on the estimated service population per unit for each category. The service population per unit factors used to calculate impact fees for general government facilities are from Table 2.1 in Chapter 2.
Existing Facilities and Existing Level of Service
In 2021, AB 602 added Section 66016.5 to the Mitigation Fee Act. That section requires, after January 1, 2022, that the level of service used in an impact fee study must be compared with the existing level of service. If the level used in the impact fee study exceeds the existing level of service, an explanation is required. The impact fees calculated in this chapter are based on the existing level of service as shown in Table 6.3 on page 6-4, so there is no level-of-service issue in the calculation of impact fees in this chapter with respect to Section 66016.5.
City of Covina Page 6-2
Development Impact Fee Study
July 7, 2023
In this chapter, the existing level of service for general government facilities is based on the relationship between the City’s existing service population and the replacement cost of existing facilities. Table 6.1 lists the City’s existing general government facilities. The impact fee cost basis for each building in Table 6.1 is the sum of the building replacement cost, the site value and the replacement cost of furniture, fixtures and equipment (FF&E).
Table 6.2 Table on the next page is a list of existing general government vehicles and equipment with their replacement costs. Replacement cost is used in this study as an indication of the cost of additional facilities and equipment that will be needed to serve future development.
Table 6.1: Existing General Government Facilities
Constr Building Bldg Repl Site Site FF&E Repl Impact Fee Facility Date Sq Ft 1
Cost 2 Acres 3Value 4Cost 5 Cost Basis 6
City Hall 1990 25,625 6,791,644$ 0.88 1,012,000$ 2,458,268$ 10,261,912$ City Yard Site 4.70 5,405,000$ 5,405,000$
City Yard Building A 1952 3,552 550,785$ 119,848$ 670,633$ City Yard Building B 1952 15,194 1,975,023$ 24,684$ 1,999,707$ City Yard Building C 1970 7,440 893,150$ 225,789$ 1,118,939$ City Yard Building D 1970 5,460 690,989$ 181,250$ 872,239$ City Fuel Stations 1970 1,851 1,100,000$ 1,100,000$
Civic Ctr Pkg Structure 2008 31,128 2,676,573$ 0.43 494,500$ 3,171,073$ Facilities share of General Government Impact Fee Fund Balance 207,556$ Total 24,807,059$
1 Existing buildings square feet from the City's insured property schedule; facilities share of General Government impact fee fund balance based on facilities percentage of total facilities and equipment cost 2 Building replacement cost from the City's insured property schedule or the Covina Public Works Dept. 3 Site acres provided by the Covina City Engineer or estimated by NBS 4 Site value based on $1,150,000 per acre
5 Replacement cost of furniture, fixtures and equipment (FF&E) based on the personal property cost from the City's insured property schedule
6 Impact fee cost basis = building replacement cost + furniture, fixtures and equipment replacement cost; impact fee fund balance provided by the City of Covina Finance Department
City of Covina Page 6-3
Development Impact Fee Study
July 7, 2023
6.3 calculates the City’s existing level of service as a cost per capita for general government facilities. The cost per capita is based on the City’s existing service population and the cost of existing facilities, vehicles and equipment from Tables 6.1 and 6.2.
Table 6.2: Existing General Government Vehicles and Equipment Description
Model
Year Department
Replacement
Cost 1
2020 Mitsubishi Outlander PHEV 2020 PW Admin. 48,000$
2020 Mitsubishi Outlander PHEV 2020 PW Admin. 48,000$
2017 Chevrolet Bolt EV 2017 PW Admin. 45,000$
2020 Nissan Leaf 2020 Env. Services 45,000$
2004 GMC Savana w/ 10'Box 2004 Bldg. Maint. 45,000$
2014 Ford C-Max Hybrid 2014 Bldg. Maint. 29,000$
Ford E-150 VAN 1999 Bldg. Maint. 45,000$
Ford F550 4X2 Crew Cab Dump Truck 2020 Streets 97,500$
Fabrique Par/Nat'l Signal Arrowboard Trailer 2019 Streets 8,500$ Wacker Riding Roller RD880V 1997 Streets 19,500$
Wacker Tilt Trailer T4000 1997 Streets 8,500$
Allmand Eclipse Light Trailer 2000 Streets 6,500$
GMC 2500HD Sierra Service Body w. Liftgate 2004 Streets 47,500$ BobCat Skid Steer S250 2006 Streets 28,500$
Chevrolet 3500HD 2007 Streets 42,500$
GMC TC7500 Reg. Cab 2009 Streets 198,500$
Case 580N Backhoe 2014 Streets 98,200$
GMC Sierra 3500 Stake Bed Dump 2014 Streets 59,500$
Ford F250 Super Duty (2) 2015 Streets 57,500$
BobCat 72" Sweeper Box 2006 Streets 10,500$
BobCat 24" Planer 2006 Streets 11,200$
BobCat 74" Combo Bucket Hydraulic 2006 Streets 8,350$
BobCat HB980 Breaker Hydraulic 2006 Streets 8,350$
BobCat 74" Construction / HD Bucket 2006 Streets 9,200 $ Bomag BW55E Walk-behind Roller 2006 Streets 19,250$
Edco CMP-8 Concrete Planer 2006 Streets 7,800$
Rayco / RG25HD-NT Stump Grinder 2008 Streets 10,900$
Wanco Message Board 2021 Streets 10,500$
Equipment share of General Government Impact Fee Fund Balance 9,060$ Total 1,082,810$
1 Replacement cost estimated by the City of Covina Public Works Department; equipment share of General Government impact fee fund balance based on equipment percentage of total facilities and equipment cost; impact fee fund balance provided by the City of Covina Finance Department
City of Covina Page 6-4
Development Impact Fee Study
July 7, 2023
Impact Fees per Unit
Table 6.4 calculates impact fees per unit by development type for general government facilities.
Those fees are based on the per-capita costs from Table 6.3 and service population per unit factors from Table 2.1. Because the cost per capita for general government vehicles and equipment in Table 6.3 is such a small number, it is combined with the per-capita cost for general government facilities to calculate the impact fees in Table 6.4.
Although impact fees are shown here for the Public/Quasi-Public category, the City does not have the authority to impose most impact fees on public schools or on projects constructed by other governmental entities. In addition, projects such as churches, hospitals and private schools, which are not legally exempt from impact fees, may vary in their impacts and may require that impact fees be based on their actual impact, such as the service population they generate.
Table 6.3: Cost per Capita - General Gov't Facilities & Vehicles Cost
Component
Impact Fee
Cost Basis 1
Existing Service
Population 2
Cost per
Capita 3
Facilities 24,807,059$ 66,878 370.93$
Vehicles and Equipment 1,082,810$ 66,878 16.19$
Total 25,889,869$ 66,878 387.12$
1 See Tables 6.1 and 6.2
2 See Table 2.2
3 Cost per capita = impact fee cost basis / existing population Table 6.4: General Government Facilities Impact Fees per Unit Development
Type Units 1
Cost per
Capita 2
Service Pop
per Unit 3
Impact Fee
per Unit 4
Residential: <600 Sq. Ft. DU $387.12 1.00 387.12$
Residential: 600-800 Sq. Ft. DU $387.12 1.35 522.61$
Residential: >800-1,200 Sq. Ft. DU $387.12 2.25 871.02$ Residential: >1,200-1,900 Sq. Ft. DU $387.12 3.55 1,374.28$ Residential: >1,900-2,300 Sq. Ft. DU $387.12 4.75 1,838.82$ Residential: >2,300 Sq. Ft. DU $387.12 5.75 2,225.94$
Commercial KSF $387.12 2.22 859.41$
Office KSF $387.12 1.62 627.14$
Industrial KSF $387.12 0.59 228.40$
Public/Quasi-Public Facilities KSF $387.12 1.62 627.14$ 1 Units of development: DU = dwelling unit
2 See Table 6.3; the cost per capita in this table is the sum of the cost per capita numbers for general government facilities and general government vehicles and equipment
3 See Table 2.1
4 Impact per unit = cost per capita X population per dwelling unit
City of Covina Page 6-5
Development Impact Fee Study
July 7, 2023
Projected Revenue
As noted in Chapter 2, this study includes a forecast of future residential development, but no forecast of future non-residential development. Consequently, the revenue projections in this section are based only on future residential development.
The residential impact fees per unit in Table 6.4 are based on residential unit size in square feet.
Although Table 2.3 in Chapter 2 shows a forecast of total future residential units to 2040, it is not possible to forecast the number of units in each unit-size category. Consequently, potential revenue from residential impact fees calculated in Table 6.5 is based on the service population added by new residential development and the cost per capita for general government facilities, vehicles and equipment. Any impact fee revenue from future non-residential development in Covina would be in addition to the amount projected in Table 6.5.
Updating the Fees
The impact fees calculated in this chapter are based on the current estimated cost of general government facilities, vehicles and equipment. We recommend that the fees be reviewed annually and adjusted as needed using local cost data or an index such as the Engineering News Record Construction Cost Index (CCI). See the Implementation Chapter for more on indexing of fees.
Nexus Summary
As discussed in Chapter 1 of this report, Section 66001 of the Mitigation Fee Act requires that an agency establishing, increasing or imposing impact fees, must make findings to:
Identify the purpose of the fee;
Identify the use of the fee; and,
Determine that there is a reasonable relationship between:
a. The use of the fee and the development type on which it is imposed; b. The need for the facility and the type of development on which the fee is imposed; and
Table 6.5: Projected Revenue - General Gov't Facilities Impact Fees Development Impact Fee Added Service Projected
Type per Capita 1
Population 2Revenue 3
All Residential $387.12 4,192 1,622,714$
Total 1,622,714$
1 See Table 6.4
2 See Table 2.3
3 Projected revenue = impact fee per capita X added population
City of Covina Page 6-6
Development Impact Fee Study
July 7, 2023
c. The amount of the fee and the facility cost attributable to the development project.
Satisfying those requirements also ensures that the fees meet the “rational nexus” and “rough proportionality” standards enunciated in leading court decisions bearing on impact fees and other exactions. (For more detail, see “Legal Framework for Impact Fees” in Chapter 1.) The following paragraphs explain how the impact fees calculated in this chapter satisfy those requirements.
Purpose of the Fee: The purpose of the impact fees calculated in this chapter is to mitigate the impact of new development on the need for general government facilities in Covina.
Use of the Fee. Impact fees calculated in this chapter will be used to provide additional general government facilities to mitigate the impacts of new development in the City. As provided by the Mitigation Fee Act, revenue from impact fees may also be used for temporary loans from one impact fee fund or account to another.
Reasonable Relationship between the Use of the Fee and the Development Type on Which It Is Imposed. The impact fees calculated in this chapter will be used to provide additional general government facilities, vehicles and equipment to serve the needs of new development in Covina.
Reasonable Relationship between the Need for the Facilities and the Type of Development on Which the Fee Is Imposed. New development increases the need for general government facilities to maintain the existing level of service as described earlier in this chapter. Without additional general government facilities, the increase in demand associated with new development would result in a reduction in the level of service provided to all development the City.
Reasonable Relationship between the Amount of the Fee and the Facility Cost Attributable to the Development Project. The amount of the impact fees for general government facilities calculated in this chapter depends on the estimated increase in service population per unit associated with each category of development. The fees per unit of development calculated in this chapter for each type of development are based on the estimated average service population per unit for that type of development in Covina. Thus, the fee charged to a development project reflects the impact of that project on the need for general government facilities in the City.
City of Covina Page 7-1
Development Impact Fee Study
July 7, 2023
Chapter 7. Police Department Facilities
This chapter calculates impact fees for Police Department facilities in Covina. Where the term Police facilities is used in this chapter, it should be understood to include vehicles and equipment.
Methodology
This chapter calculates impact fees using the standard-based method discussed in Chapter 1.
Standard-based fees are calculated using a specified relationship or standard that determines the number of service units to be provided for each unit of development. All of the impact fees calculated in this chapter are based on the City’s existing level of service (LOS) as defined in the section titled Existing Facilities and Existing Level of Service, below. Impact fees calculated in that manner are intended to provide the funding needed to maintain the existing level of service as the City grows.
Service Area
The impact fees calculated in this chapter are intended to apply to all new development in the City.
Demand Variable
A “demand variable” is a quantifiable attribute of development that is used in impact fee calculation formulas to represent the impact of development on a particular type of capital facilities. The demand variable used to calculate impact fees for Police facilities in this chapter is calls for service per year.
Impact fees calculated in this chapter for different categories of development vary depending on the number of calls for service per unit per year generated by each category. The calls-for-serviceper-unit-per-year factors used to calculate impact fees for Police facilities in this study are derived from analysis of a random sample of all of the City’s police calls for service for calendar year 2021.
The Covina Police Department logged 36,350 calls for service in 2021. NBS took a random sample of 725 of those calls and classified them by the type of development where the call originated.
Of the 725 sampled calls, 145 could not be classified because they were not associated with a specific address. Statistically, the remaining 580 calls represent a sample large enough to reach a margin of error of 4% at a 95% confidence level.
The sampled calls were used to determine the percentage of all calls generated by various types of development. Those percentages were applied to the total number of 2021 calls to determine the number of calls associated with each type of development. Then, the number of calls for each development type was divided by the number of existing units of that type to arrive at a callsper-unit-per year factor for each type of development.
For residential development, police calls for service could not be identified for each unit-size category used in this study, so calls-per-unit-per-year factors were calculated for single-family, multi-family and mobile home unit types. The range of factors for those unit types was then used to establish a range of factors for all residential unit size categories used in this study as shown
City of Covina Page 7-2
Development Impact Fee Study
July 7, 2023
in Table 2.1 in Chapter 2 and in Table 7.4 in this chapter. It should also be noted that calls for service to parks and schools were reallocated to residential development which creates the need for the parks and schools.
Existing Facilities and Existing Level of Service
In 2021, AB 602 added Section 66016.5 to the Mitigation Fee Act. That section requires, after January 1, 2022, that the level of service used in an impact fee study must be compared with the existing level of service. If the level used in the impact fee study exceeds the existing level of service, an explanation is required. The impact fees calculated in this chapter are based on the existing level of service as shown in Table 7.3 on page 7-4, so there is no level-of-service issue in the calculation of impact fees in this chapter with respect to Section 66016.5.
In this chapter, the existing level of service for Police facilities is based on the relationship between the current number of calls for service per year and the replacement cost of existing facilities. Table 7.1 lists the City’s existing Police buildings. The impact fee cost basis for each building in Table 7.1 is the sum of the building replacement cost, site value and the replacement cost of furniture, fixtures and equipment (FF&E).
Table 7.2 is a list of existing Police vehicles and equipment with their replacement costs.
Replacement cost is used in this study as an indication of the cost of additional facilities and equipment that will be needed to serve future development.
Table 7.1: Existing Police Department Facilities
Constr Building Bldg Repl Site Site FF&E Repl Impact Fee Facility Date Sq Ft 1
Cost 2 Acres 3Value 4Cost 5 Cost Basis 6
Police-Fire Admin Bldg 1976 18,444 4,214,678$ 1.60 1,840,000$ 4,240,612$ 10,295,290$ Police Dept Storage Bldg 1970 5,250 65,013 N/A 65,013$
Facilities share of Police Impact Fee Fund Balance 55,299$ Total 10,415,602$
1 Admin building square footage reflects Police Department share of total building area; total square footage is 20,444 from the City's insured property schedule; LA County Fire Department occupies approximately 2,000 square feet; facilities share of the police impact fee fund balance based on facilities share of total facilities and vehicles/equipment cost 2 Building replacement cost is the Police Department share of the total replacement cost shown in the City's insured property schedule
3 Site acres reflects Police Department portion of the Police-Fire Administration Building site; site acreage estimated by NBS from satellite photos
4 Site value based on $1,150,000 per acre
5 Replacement cost of furniture, fixtures and equipment (FF&E) based on the personal property cost from the City's insured property schedule
5 Impact fee cost basis = building replacement cost + furniture, fixtures and equipment replacement cost
City of Covina Page 7-3
Development Impact Fee Study
July 7, 2023
Table 7.3 calculates the City’s existing level of service as a cost per call for service for Police facilities. The cost per call is based on 2021 calls for service and the cost of existing facilities, vehicles and equipment from Tables 7.1 and 7.2.
Table 7.2: Existing Police Department Vehicles and Equipment Quantity
Model
Year Make Assignment
Unit Repl
Cost
Total Repl
Cost
1 2000 Ford CS3 30,000$ 30,000$
1 2002 Ford CS2 30,000$ 30,000$
2 2003 Ford Patrol 68,000$ 136,000$
2 2004 Ford Patrol/CS4 68,000$ 136,000$
1 2005 Ford Supervisor 68,000$ 68,000$
1 2005 Jeep Parking Enf 35,000$ 35,000$
1 2009 Ford Patrol 68,000$ 68,000$
1 2009 Toyota CS4 30,000$ 30,000$
9 2011 Ford Patrol 68,000$ 612,000$
1 2012 Chev Patrol 68,000$ 68,000$
1 2013 Ford Patrol 68,000$ 68,000$
1 2014 Ford Patrol 68,000$ 68,000$
2 2015 Ford K9/Patrol 68,000$ 136,000$
1 2015 Toyota CS1 30,000$ 30,000$
1 2017 Ford Traffic 68,000$ 68,000$
1 2018 Chev Supervisor 68,000$ 68,000$
1 2019 Ford K9 68,000$ 68,000$
2 2020 Ford Patrol 68,000$ 136,000$
100 Portable Police Radios 8,000$ 800,000$
1 Motorola Dispatch Consoles Lump Sum 497,000$
1 CAD RMS System Lump Sum 750,000$
59 Sworn Officer Personal Safety Equipt. 4,000$ 236,000 $ Vehicles/equipment share of Police impact fee fund balance 22,087$ Total 4,160,087$
Source: City of Covina Police Department; vehicles and equipment share of Police impact fee fund balance based on vehicles and equipment percentage of total faclities and vehicles and equipment cost
City of Covina Page 7-4
Development Impact Fee Study
July 7, 2023
Impact Fees per Unit
Table 7.4 calculates impact fees per unit by development type for Police facilities. Those fees are based on the cost per call from Table 7.3 and calls-for-service-per-unit-per-year factors from Table 2.1.
Although impact fees are shown here for the Public/Quasi-Public category, the City does not have the authority to impose most impact fees on public schools or on projects constructed by other governmental entities. In addition, projects such as churches, hospitals and private schools, which are not legally exempt from impact fees, may vary in their impacts and may require that impact fees be based on their actual impact, such as the number of calls for service they generate.
Table 7.3: Cost per Call - Police Dept. Facilities & Vehicles Cost
Component
Impact Fee
Cost Basis 1
Existing Calls for
Svc per Year 2
Cost per
Call 3
Facilities 10,415,602$ 36,350 286.54$
Vehicles/Equipment 4,160,087$ 36,350 114.45$
Total 14,575,689$ 36,350 400.98$
1 See Tables 7.1 and 7.2
2 See Table 2.2
3 Cost per call = impact fee cost basis / existing calls per year Table 7.4: Police Impact Fees per Unit
Development
Type Units 1
Cost per
Call 2
Calls per Unit
per Year 3
Impact Fee
per Unit 4
Residential: <600 Sq. Ft. DU $400.98 0.87 348.85$
Residential: 600-800 Sq. Ft. DU $400.98 0.92 368.90$
Residential: >800-1,200 Sq. Ft. DU $400.98 0.97 388.95 $ Residential: >1,200-1,900 Sq. Ft. DU $400.98 1.02 409.00$ Residential: >1,900-2,300 Sq. Ft. DU $400.98 1.07 429.05$ Residential: >2,300 Sq. Ft. DU $400.98 1.12 449.10$
Commercial KSF $400.98 4.95 1,983.38$
Office KSF $400.98 0.40 159.87$
Industrial KSF $400.98 0.21 82.97$
Public/Quasi-Public Facilities KSF $400.98 2.33 935.85$ 1 Units of development: DU = dwelling unit; KSF = 1,000 square feet of building floor area
2 See Table 7.3
3 See Table 2.1
4 Impact per unit = cost per call X calls per unit per year
City of Covina Page 7-5
Development Impact Fee Study
July 7, 2023
Projected Revenue
As noted in Chapter 2, this study includes a forecast of future residential development, but no forecast of future non-residential development. Consequently, the revenue projections in this section are based only on future residential development.
The residential impact fees per unit in Table 7.4 are based on residential unit size in square feet.
Although Table 2.3 in Chapter 2 shows a forecast of total future residential units to 2040, it is not possible to forecast the number of units in each unit-size category. Consequently, potential revenue from residential impact fees calculated in Table 7.5 is based on the cost per call for service, the average calls per service per residential unit and the number of future residential units. Any impact fee revenue from future non-residential development in Covina would be in addition to the amount projected in Table 7.5.
Updating the Fees
The impact fees calculated in this chapter are based the current estimated cost of Police facilities, vehicles and equipment. We recommend that the fees be reviewed annually and adjusted as needed using local cost data or an index such as the Engineering News Record Construction Cost Index (CCI). See the Implementation Chapter for more on indexing of fees.
Nexus Summary
As discussed in Chapter 1 of this report, Section 66001 of the Mitigation Fee Act requires that an agency establishing, increasing or imposing impact fees, must make findings to:
Identify the purpose of the fee;
Identify the use of the fee; and,
Determine that there is a reasonable relationship between:
a. The use of the fee and the development type on which it is imposed; b. The need for the facility and the type of development on which the fee is imposed; and
Table 7.5: Projected Revenue - Police Impact Fees
Development Cost per Avg Calls per Added Res. Projected Type Call 1
Res. Unit 2Units 3Revenue 4
All Residential $400.98 1.1 1,863 821,732$
Total 821,732$
1 See Table 7.3
2 Average calls per residential unit estimated by NBS; see calls per unit per year factors in Table 2.1
3 See Table 2.3
4 Projected revenue = cost per call X calls per residential unit per year X added residential units
City of Covina Page 7-6
Development Impact Fee Study
July 7, 2023
c. The amount of the fee and the facility cost attributable to the development project.
Satisfying those requirements also ensures that the fees meet the “rational nexus” and “rough proportionality” standards enunciated in leading court decisions bearing on impact fees and other exactions. (For more detail, see “Legal Framework for Impact Fees” in Chapter 1.) The following paragraphs explain how the impact fees calculated in this chapter satisfy those requirements.
Purpose of the Fee: The purpose of the impact fees calculated in this chapter is to mitigate the impact of new development on the need for Police facilities in Covina.
Use of the Fee. Impact fees calculated in this chapter will be used to provide additional or improved Police facilities, and additional vehicles and equipment to mitigate the impacts of new development in the City. As provided by the Mitigation Fee Act, revenue from impact fees may also be used for temporary loans from one impact fee fund or account to another.
Reasonable Relationship between the Use of the Fee and the Development Type on Which It Is Imposed. The impact fees calculated in this chapter will be used to provide additional or improved Police facilities, and additional vehicles and equipment to serve the needs of new development in Covina.
Reasonable Relationship between the Need for the Facilities and the Type of Development on Which the Fee Is Imposed. New development increases the need for Police facilities to maintain the existing level of service as described earlier in this chapter. Without additional or improved Police facilities, the increase in demand associated with new development would result in a reduction in the level of service provided to all development the City.
Reasonable Relationship between the Amount of the Fee and the Facility Cost Attributable to the Development Project. The amount of the impact fees for Police facilities calculated in this chapter depends on the number of calls for service per unit per year associated with each category of development. The fees per unit of development calculated in this chapter for each type of development are based on the estimated number of calls per unit per year associated with that type of development in Covina. Thus, the fee charged to a development project reflects the impact of that project on the need for Police facilities in the City.
City of Covina Page 8-1
Development Impact Fee Study
July 7, 2023
Chapter 8. Fire Protection Facilities
This chapter calculates impact fees for Fire Department facilities in Covina. Covina contracts with the Los Angeles County Fire department to provide fire protection and emergency response services to the City. The City owns all three fire stations in the City as well as the Police-Fire Administration Building which is partly occupied by Fire Department staff. The County Fire Department owns the apparatus and vehicles assigned to Covina. Those assets will not be addressed in this study.
Methodology
This chapter calculates impact fees using the standard-based method discussed in Chapter 1.
Standard-based fees are calculated using a specified relationship or standard that determines the number of service units to be provided for each unit of development. All of the impact fees calculated in this chapter are based on the City’s existing level of service (LOS) as defined in the section titled Existing Facilities and Existing Level of Service, below. Impact fees calculated in that manner are intended to provide the funding needed to maintain the existing level of service as the City grows.
Service Area
The impact fees calculated in this chapter are intended to apply to all new development in the City.
Demand Variable
A “demand variable” is a quantifiable attribute of development that is used in impact fee calculation formulas to represent the impact of development on a particular type of capital facilities. The demand variable used to calculate impact fees for Fire department facilities in this chapter is calls for service per year.
Impact fees calculated in this chapter for different categories of development vary depending on the number of calls for service per unit per year generated by each category. The calls-for-serviceper-unit-per-year factors used to calculate impact fees for Fire Department facilities in this study are derived from analysis of a random sample of all of the Fire Department calls for service for calendar year 2021. The Los Angeles County Fire Department logged 5,138 calls for service in Covina in 2021. A list of those calls was provided to the City with locations indicated by geographic coordinates. The City converted the locations into addresses using a GIS program.
NBS took a random sample of 425 of those calls and classified them by the type of development where the call originated. Of the 425 sampled calls, 33 could not be classified because of apparent address errors. Statistically, the remaining 392 calls represent a sample large enough to reach a margin of error of 4.75% at a 95% confidence level.
The sampled calls were used to determine the percentage of all calls generated by various types of development. Those percentages were applied to the total number of 2021 calls to determine the number of calls associated with each type of development. Then, the number of calls for each
City of Covina Page 8-2
Development Impact Fee Study
July 7, 2023
development type was divided by the number of existing units of that type to arrive at a callsper-unit-per year factor for each type of development.
For residential development, Fire Department calls for service could not be identified for each unit-size category used in this study, so calls-per-unit-per-year factors were calculated for singlefamily, multi-family and mobile home unit types. The range of factors for those unit types was then used to establish a range of factors for all residential unit size categories used in this study as shown in Table 2.1 in Chapter 2 and in Table 8.3 in this chapter. It should also be noted that calls for service to parks and schools were reallocated to residential development which creates the need for the parks and schools.
Existing Facilities and Existing Level of Service
In 2021, AB 602 added Section 66016.5 to the Mitigation Fee Act. That section requires, after January 1, 2022, that the level of service used in an impact fee study must be compared with the existing level of service. If the level used in the impact fee study exceeds the existing level of service, an explanation is required. The impact fees calculated in this chapter are based on the existing level of service as shown in Table 8.2 on the next page, so there is no level-of-service issue in the calculation of impact fees in this chapter with respect to Section 66016.5.
In this chapter, the existing level of service for Fire Department facilities is based on the relationship between the current number of calls for service per year and the replacement cost of existing facilities. Table 8.1 lists the City-owned buildings used by the Los Angeles County Fire Department to serve the City of Covina. The impact fee cost basis for each building in Table 8.1 is the sum of the building replacement cost and site value.
City of Covina Page 8-3
Development Impact Fee Study
July 7, 2023
Table 8.2 calculates the City’s existing level of service as a cost per call for service for Fire Department facilities. The cost per call is based on 2021 calls for service and the cost of existing facilities from Table 8.1.
Impact Fees per Unit
Table 8.3 calculates impact fees per unit by development type for Fire Department facilities.
Those fees are based on the cost per call from Table 8.2 and calls-for-service-per-unit-per-year factors from Table 2.1.
Although impact fees are shown here for the Public/Quasi-Public category, the City does not have the authority to impose most impact fees on public schools or on projects constructed by other governmental entities. In addition, projects such as churches, hospitals and private schools, Table 8.1: Existing Fire Department Facilities
Constr Building Bldg Repl Site Site FF&E Repl Impact Fee Facility Date Sq Ft 1
Cost 2 Acres 3Value 4Cost 5 Cost Basis 6
Police-Fire Admin Bldg 1976 2,000 457,024$ 0.17 195,500$ 0$ 652,524$ Fire Station #152 1958 4,552 1,113,305$ 0.90 1,035,000$ 0$ 2,148,305$ Fire Station #153 1961 4,552 1,113,305$ 1.14 1,311,000$ 0$ 2,424,305$ Training Tower 1965 686 103,418 Included 0$ 103,418$
Fire Station #154 1976 10,834 2,944,474$ 0.69 793,500$ 0$ 3,737,974$ Fire impact fee fund balance 108,873$
Total 9,175,399$
1 Admin building square footage reflects Fire Department share of total building area; total square footage is 20,444 from the City's insured property schedule 2 Building replacement cost is the Fire Department share of the total replacement cost shown in the City's insured property schedule
3 Site acres estimated by NBS based on satellite photos 4 Site value based on $1,150,000 per acre
5 Furniture, fixtures and equipment (FF&E) located in Fire Department buildings are assumed to be property of the Los Angeles County Fire Department which operates those facilities 6 Impact fee cost basis = building replacement cost + site value; impact fee fund balance provided by the City of Covina Finance Department
Table 8.2: Cost per Call - Fire Department Facilities
Impact Fee
Cost Basis 1
Existing Calls for
Svc per Year 2
Cost per
Call 3
$9,175,399 5,160 $1,778.13
1 See Table 8.1
2 See Table 2.2
3 Cost per call = impact fee cost basis / existing calls for service per year
City of Covina Page 8-4
Development Impact Fee Study
July 7, 2023
which are not legally exempt from impact fees, may vary in their impacts and may require that impact fees be based on their actual impact, such as the number of peak hour trips they generate.
Projected Revenue
As noted in Chapter 2, this study includes a forecast of future residential development, but no forecast of future non-residential development. Consequently, the revenue projections in this section are based only on future residential development.
The residential impact fees per unit in Table 8.4 are based on residential unit size in square feet.
Although Table 2.3 in Chapter 2 shows a forecast of total future residential units to 2040, it is not possible to forecast the number of units in each unit-size category. Consequently, potential revenue from residential impact fees calculated in Table 8.5 is based on the cost per call for service, the average calls per service per residential unit and the number of future residential units. Any impact fee revenue from future non-residential development in Covina would be in addition to the amount projected in Table 8.5
Table 8.3: Fire Impact Fees per Unit
Development
Type Units 1
Cost per
Call 2
Calls per Unit
per Year 3
Impact Fee
per Unit 4
Residential: <600 Sq. Ft. DU $1,778.13 0.09 160.03$
Residential: 600-800 Sq. Ft. DU $1,778.13 0.13 231.16$
Residential: >800-1,200 Sq. Ft. DU $1,778.13 0.17 302.28$ Residential: >1,200-1,900 Sq. Ft. DU $1,778.13 0.21 373.41$ Residential: >1,900-2,300 Sq. Ft. DU $1,778.13 0.25 444.53$ Residential: >2,300 Sq. Ft. DU $1,778.13 0.29 515.66$
Commercial KSF $1,778.13 0.28 497.88$
Office KSF $1,778.13 0.10 177.81$
Industrial KSF $1,778.13 0.07 124.47$
Public/Quasi-Public Facilities KSF $1,778.13 0.42 746.82$ 1 Units of development: DU = dwelling unit; KSF = 1,000 square feet of building floor area
2 See Table 8.2
3 See Table 2.1
4 Impact per unit = cost per call X calls per unit per year
City of Covina Page 8-5
Development Impact Fee Study
July 7, 2023
Updating the Fees
The impact fees calculated in this chapter are based the current estimated cost of Fire Department facilities. We recommend that the fees be reviewed annually and adjusted as needed using local cost data or an index such as the Engineering News Record Construction Cost Index (CCI). See the Implementation Chapter for more on indexing of fees.
Nexus Summary
As discussed in Chapter 1 of this report, Section 66001 of the Mitigation Fee Act requires that an agency establishing, increasing or imposing impact fees, must make findings to:
Identify the purpose of the fee;
Identify the use of the fee; and,
Determine that there is a reasonable relationship between:
a. The use of the fee and the development type on which it is imposed; b. The need for the facility and the type of development on which the fee is imposed; and
c. The amount of the fee and the facility cost attributable to the development project.
Satisfying those requirements also ensures that the fees meet the “rational nexus” and “rough proportionality” standards enunciated in leading court decisions bearing on impact fees and other exactions. (For more detail, see “Legal Framework for Impact Fees” in Chapter 1.) The following paragraphs explain how the impact fees calculated in this chapter satisfy those requirements.
Purpose of the Fee: The purpose of the impact fees calculated in this chapter is to mitigate the impact of new development on the need for Fire Department facilities in Covina.
Use of the Fee. Impact fees calculated in this chapter will be used to provide additional or improved Fire Department facilities to mitigate the impacts of new development in the City. As Table 8.4: Projected Revenue - Fire Impact Fees
Development Cost per Avg Calls per Added Res. Projected Type Call 1
Res. Unit 2Units 3Revenue 4
All Residential $1,778.13 0.2 1,863 662,532$
Total 662,532$
1 See Table 8.3
2 Average calls per residential unit estimated by NBS; see calls per unit per year factors in Table 2.1
3 See Table 2.3
4 Projected revenue = cost per call X calls per residential unit per year X added residential units
City of Covina Page 8-6
Development Impact Fee Study
July 7, 2023
provided by the Mitigation Fee Act, revenue from impact fees may also be used for temporary loans from one impact fee fund or account to another.
Reasonable Relationship between the Use of the Fee and the Development Type on Which It Is Imposed. The impact fees calculated in this chapter will be used to provide additional or improved Fire Department facilities to serve the needs of new development in Covina.
Reasonable Relationship between the Need for the Facilities and the Type of Development on Which the Fee Is Imposed. New development increases the need for Fire Department facilities to maintain the existing level of service as described earlier in this chapter. Without additional or improved Fire Department facilities, the increase in demand associated with new development would result in a reduction in the level of service provided to all development the City.
Reasonable Relationship between the Amount of the Fee and the Facility Cost Attributable to the Development Project. The amount of the impact fees for Fire Department facilities calculated in this chapter depends on the number of calls for service per unit per year associated with each category of development. The fees per unit of development calculated in this chapter for each type of development are based on the estimated number of calls per unit per year associated with that type of development in Covina. Thus, the fee charged to a development project reflects the impact of that project on the need for Fire Department facilities in the City.
City of Covina Page 9-1
Development Impact Fee Study
July 7, 2023
Chapter 9. Street Improvements and Traffic Signals
This chapter calculates impact fees for street improvements and traffic signals in Covina.
Methodology
This chapter calculates impact fees using the standard-based method discussed in Chapter 1.
Standard-based fees are calculated using a specified relationship or standard that determines the number of service units to be provided for each unit of development. The impact fees calculated in this chapter are based on the City’s existing level of service (LOS) as defined in the section titled Existing Facilities and Existing Level of Service, below. Impact fees calculated in that manner are intended to provide the funding needed to maintain the existing level of service as the City grows.
Service Area
The impact fees calculated in this chapter are intended to apply to all new development in the City.
Demand Variable
A “demand variable” is a quantifiable attribute of development that is used in impact fee calculation formulas to represent the impact of development on a particular type of capital facilities. The demand variable used to calculate impact fees for streets and traffic signals in this chapter is peak hour trips per day.
Impact fees calculated in this chapter for different categories of development vary depending on the number of peak hour trips per day generated by each category. The peak hour trip factors used to calculate impact fees for streets and traffic signals in this study are based on the Institute of Transportation Engineers (ITE) weekday p.m. peak hour rate from the 11th edition of Trip Generation.
Existing Facilities and Existing Level of Service
In 2021, AB 602 added Section 66016.5 to the Mitigation Fee Act. That section requires, after January 1, 2022, that the level of service used in an impact fee study must be compared with the existing level of service. If the level used in the impact fee study exceeds the existing level of service, an explanation is required. The impact fees calculated in this chapter are based on the existing level of service as shown in Table 9.3 on the next page, so there is no level-of-service issue in the calculation of impact fees in this chapter with respect to Section 66016.5.
In this chapter, the existing level of service for streets and traffic signals is based on the relationship between the number of peak hour trips per day generated by existing development in Covina and the replacement cost of existing arterial and collector streets and traffic signals.
Table 9.1 calculates the replacement cost of the City’s existing arterial and collector streets. That cost is shown in Table 9.1 as the impact fee cost basis. No right-of-way costs are included in the impact fees calculated in this chapter. Replacement cost is used here to reflect the cost of constructing additional street improvements needed to serve new development.
City of Covina Page 9-2
Development Impact Fee Study
July 7, 2023
Table 9.2 calculates the replacement cost of the City’s existing traffic signals. That cost is shown in Table 9.2 as the impact fee cost basis.
Table 9.3 calculates the City’s existing level of service as a cost per peak hour trip for arterial and collector streets and traffic signals. The cost per peak hour trip is based on the number of existing peak hour trips and the impact fee cost basis for existing streets and signals from Tables 9.1 and
9.2. Table 9.1: Existing Arterial and Collector Streets Lane-Miles of Existing Cost per Impact Fee
Arterial/Collector Streets 1Lane-Mile 2 Cost Basis 3
141.3 $2,500,000 353,250,000.00$
Facilities share of street impact fee fund balance 771,286.26$ Total 354,021,286.26$
1 Lane-Miles of existing arterial and collector streets based on data from the Covina 2020-2025 Pavement Management Program
2 Replacement cost per lane-mile estimated by the Covina City Engineer 3 Impact fee cost basis = lane miles of existing arterial/collector streets X replacement cost per lane-mile; impact fee fund balance provided by the City of Covina Finance Department; the streets share of the impact fee fund balance based on the streets percentage of the total streets and traffic signals cost
Table 9.2: Existing Traffic Signals
Number of Existing Average Cost per Impact Fee
Traffic Signals 1Traffic Signal 1 Cost Basis 2
51 $800,000 $ 40,800,000.00
Signals share of street impact fee fund balance $ 89,082.74 Total $ 40,889,082.74
1 Number of existing traffic signals and average cost per signal provided by the Covina City Engineer
2 Impact fee cost basis = number of traffic signals X average replacement cost per signal; traffic signals share of street impact fee fund balance based on traffic signals percentage of total streets and traffic signals cost
City of Covina Page 9-3
Development Impact Fee Study
July 7, 2023
Impact Fees per Unit
Table 9.4 calculates impact fees per unit by development type for arterials and collector streets.
Those fees are based on the cost per peak hour trip from Table 9.3 and peak hour trips per unit factors from Table 2.1.
Although impact fees are shown here for the Public/Quasi-Public category, the City does not have the authority to impose most impact fees on public schools or on projects constructed by other governmental entities. In addition, projects such as churches, hospitals and private schools, which are not legally exempt from impact fees, may vary in their impacts and may require that impact fees be based on their actual impact, such as the number of peak hour trips they generate.
Table 9.3: Streets and Traffic Signals - Cost per Peak Hour Trip Cost
Component
Impact Fee
Cost Basis 1
Existing Peak
Hour Trips 2
Cost per Peak
Hour Trip 3
Arterial/Collector Streets $ 354,021,286 27,318 $ 12,959.31 Traffic Signals 40,889,083$ 27,318 $ 1,496.79
Total 394,910,369$ 27,318 14,456.10$
1 See Tables 9.1 and 9.2
2 See Table 2.2
3 Cost per peak hour trip = impact fee cost basis / existing peak hour trips Table 9.4: Arterial and Collector Streets - Impact Fees per Unit Development
Type Units 1
Cost per Peak
Hour Trip 2
Peak Hour Trips
per Unit 3
Impact Fee
per Unit 4
Residential: <600 Sq. Ft. DU $12,959.31 0.44 5,702.10$
Residential: 600-800 Sq. Ft. DU $12,959.31 0.56 7,257.21$ Residential: >800-1,200 Sq. Ft. DU $12,959.31 0.70 9,071.52$ Residential: >1,200-1,900 Sq. Ft. DU $12,959.31 0.85 11,015.41$ Residential: >1,900-2,300 Sq. Ft. DU $12,959.31 0.99 12,829.72$ Residential: >2,300 Sq. Ft. DU $12,959.31 1.10 14,255.24$ Commercial KSF $12,959.31 2.29 29,624.98$
Office KSF $12,959.31 1.15 14,903.21$
Industrial KSF $12,959.31 0.41 5,313.32$
Public/Quasi-Public Facilities KSF $12,959.31 1.15 14,903.21$ 1 Units of development: DU = dwelling unit; KSF = 1,000 square feet of building floor area
2 See Table 9.3
3 See Table 2.1
4 Impact per unit = cost per peak hour trip X peak hour trips per unit
City of Covina Page 9-4
Development Impact Fee Study
July 7, 2023
Table 9.5 calculates impact fees per unit by development type for traffic signals. Those fees are based on the cost per peak hour trip from Table 9.3 and peak hour trips per unit factors from Table 2.1.
Projected Revenue
As noted in Chapter 2, this study includes a forecast of future residential development, but no forecast of future non-residential development. Consequently, the revenue projections in this section are based only on future residential development.
The residential impact fees per unit in Tables 9.4 and 9.5 are based on residential unit size in square feet. Although Table 2.3 in Chapter 2 shows a forecast of total future residential units to 2040, it is not possible to forecast the number of units in each unit-size category. Consequently, potential revenue from residential impact fees calculated in Tables 9.6 and 9.7 are based on the cost per peak hour trip and the number of added peak hour trips to 2040. Any impact fee revenue from future non-residential development in Covina would be in addition to the amounts projected in Tables 9.6 and 9.7
Table 9.6 projects impact fee revenue from future residential development using the cost per peak hour trip for arterial and collector streets and the number of added peak hour trips to 2040.
Table 9.5: Traffic Signals - Impact Fees per Unit
Development
Type Units 1
Cost per Peak
Hour Trip 2
Peak Hour Trips
per Unit 3
Impact Fee
per Unit 4
Residential: <600 Sq. Ft. DU $1,496.79 0.44 $ 658.59
Residential: 600-800 Sq. Ft. DU $1,496.79 0.56 $ 838.20 Residential: >800-1,200 Sq. Ft. DU $1,496.79 0.70 $ 1,047.75 Residential: >1,200-1,900 Sq. Ft. DU $1,496.79 0.85 $ 1,272.27 Residential: >1,900-2,300 Sq. Ft. DU $1,496.79 0.99 $ 1,481.82 Residential: >2,300 Sq. Ft. DU $1,496.79 1.10 $ 1,646.47 Commercial KSF $1,496.79 2.29 $ 3,421.65
Office KSF $1,496.79 1.15 $ 1,721.30
Industrial KSF $1,496.79 0.41 $ 613.68
Public/Quasi-Public Facilities KSF $1,496.79 1.15 $ 1,721.30 1 Units of development: DU = dwelling unit; KSF = 1,000 square feet of building floor area
2 See Table 9.3
3 See Table 2.1
4 Impact per unit = cost per peak hour trip X peak hour trips per unit
City of Covina Page 9-5
Development Impact Fee Study
July 7, 2023
Table 9.7 calculates projected revenue for the traffic impact fees, using the cost per peak hour trip for traffic signals and the number of added peak hour trips to 2040.
Updating the Fees
The impact fees calculated in this chapter are based the current estimated cost of street improvements and traffic signals. We recommend that the fees be reviewed annually and adjusted as needed using local cost data or an index such as the Engineering News Record Construction Cost Index (CCI). See the Implementation Chapter for more on indexing of fees.
Nexus Summary
As discussed in Chapter 1 of this report, Section 66001 of the Mitigation Fee Act requires that an agency establishing, increasing or imposing impact fees, must make findings to:
Identify the purpose of the fee;
Identify the use of the fee; and,
Determine that there is a reasonable relationship between:
a. The use of the fee and the development type on which it is imposed; b. The need for the facility and the type of development on which the fee is imposed; and
Table 9.6: Projected Revenue - Street Impact Fees
Development Cost per Peak Added Res. Peak Projected
Type Hour Trip 1
Hour Trips 2Revenue 3
All Residential $12,959.31 1,304 16,898,941$
Total 16,898,941$
1 See Table 9.3
2 Added residential peak hour trips; see Table 2.3
4 Projected revenue = cost per peak hour trip X added residential peak hour trips
Table 9.7: Projected Revenue - Traffic Signal Impact Fees Development Cost per Peak Added Res. Peak Projected
Type Hour Trip 1
Hour Trips 2Revenue 3
All Residential $1,496.79 1,304 1,951,810$
Total 1,951,810$
1 See Table 9.3
2 Added residential peak hour trips; see Table 2.3
4 Projected revenue = cost per peak hour trip X added residential peak hour trips
City of Covina Page 9-6
Development Impact Fee Study
July 7, 2023
c. The amount of the fee and the facility cost attributable to the development project.
Satisfying those requirements also ensures that the fees meet the “rational nexus” and “rough proportionality” standards enunciated in leading court decisions bearing on impact fees and other exactions. (For more detail, see “Legal Framework for Impact Fees” in Chapter 1.) The following paragraphs explain how the impact fees calculated in this chapter satisfy those requirements.
Purpose of the Fee: The purpose of the impact fees calculated in this chapter is to mitigate the impact of new development on the need for streets and traffic signals facilities in Covina.
Use of the Fee. Impact fees calculated in this chapter will be used to provide street improvements and traffic signals to mitigate the impacts of new development on Covina’s street system. As provided by the Mitigation Fee Act, revenue from impact fees may also be used for temporary loans from one impact fee fund or account to another.
Reasonable Relationship between the Use of the Fee and the Development Type on Which It Is Imposed. The impact fees calculated in this chapter will be used to provide street improvements and traffic signals to mitigate the impacts of new development on Covina’s street system.
Reasonable Relationship between the Need for the Facilities and the Type of Development on Which the Fee Is Imposed. New development generates additional vehicle traffic that increases the need for street capacity and traffic signals to maintain the existing level of service as described earlier in this chapter. Without additional street improvements and traffic signals, the increase in demand associated with new development would result in a reduction in the level of service provided to all development the City.
Reasonable Relationship between the Amount of the Fee and the Facility Cost Attributable to the Development Project. The amount of the impact fees for streets and traffic signals calculated in this chapter depends on the number of peak hour trips generated by each category of development. The fees per unit of development calculated in this chapter for each type of development are based on the estimated number of peak hour trips per unit associated with that type of development in Covina. Thus, the fee charged to a development project reflects the impact of that project on the need for street improvements and traffic signals in the City.
City of Covina Page 10-1
Development Impact Fee Study
July 7, 2023
Chapter 10. Implementation
This chapter of the report contains recommendations for adoption and administration of impact fees, and for the interpretation and application of the development impact fees and in-lieu fees calculated in this study. It was not prepared by an attorney and is not intended as legal advice.
Statutory requirements for the adoption and administration of fees imposed as a condition of development approval (impact fees) are found in the Mitigation Fee Act (Government Code Sections 66000 et seq.).
Adoption
The form in which development impact fees are enacted should be determined by the City attorney. The specific requirements are different for impact fees under the Mitigation Fee Act, and for park land dedication and in-lieu fees under the Quimby Act. The latter requirements must be adopted by ordinance and are subject to the same noticing and public hearing procedures as any ordinance.
Procedures for adoption of fees subject to the Mitigation Fee Act, including notice and publichearing requirements, are specified in Government Code Sections 66016 and 66018. It should be noted that Section 66018 refers to Government Code Section 6062a, which requires that the public hearing notice be published at least twice during the 10-day notice period. However, Section 66016.5 added by AB 602 in 2021 requires that impact fee nexus studies be adopted at a public hearing with at least 30-days’ notice.
Government Code Section 66017 provides that fees subject to the Mitigation Fee Act do not become effective until 60 days after final action by the governing body.
Actions establishing or increasing fees subject to the Mitigation Act require certain findings, as set forth in Government Code Section 66001 and discussed in Chapter 1 of this report.
Examples of findings that could be used for impact fees calculated in this study are shown below.
The specific language of such findings should be provided by the City Attorney. A more complete discussion of the nexus for each fee can be found in individual chapters of this report.
Sample Finding: Purpose of the Fee. The City Council finds that the purpose of the impact fees hereby enacted is to protect the public health, safety and welfare by requiring new development to contribute to the cost of public facilities needed to mitigate the impacts of new development.
Sample Finding: Use of the Fee. The City Council finds that revenue from the impact fees hereby enacted will be used to provide public facilities needed to mitigate the impacts of
City of Covina Page 10-2
Development Impact Fee Study
July 7, 2023
new development in the City and identified in the 2023 City of Covina Development Impact Fee Study by NBS. 2
Sample Finding: Reasonable Relationship: Based on analysis presented in the 2023 City of Covina Development Impact Fee Study by NBS, the City Council finds that there is a reasonable relationship between:
a. The use of the fees and the types of development projects on which they are imposed; and,
b. The need for facilities and the types of development projects on which the fees are imposed.
Administration
The California Mitigation Fee Act (Government Code Sections 66000 et seq.) mandates procedures for administration of impact fee programs, including collection and accounting, reporting, and refunds. References to code sections in the following paragraphs pertain to the California Government Code.
Notices and Statute of Limitations. Section 66006 (f) provides that a local agency, at the time it imposes a fee for public improvements on a specific development project, "... shall identify the public improvement that the fee will be used to finance." The required notification could refer to the improvements identified in this study or to a capital improvement plan.
Section 66020 (d) (1) requires that the agency, at the time it imposes an impact fee, provide a written statement of the amount of the fee and written notice of a 90-day period during which the imposition of the fee can be protested. Failure to protest imposition of the fee during that period may deprive the fee payer of the right to subsequent legal challenge.
Section 66022 (a) provides a separate procedure for challenging the establishment of an impact fee. Such challenges must be filed within 120 days of enactment.
Collection of Fees. Section 66007(a) provides that a local agency shall not require payment of fees by developers of residential projects prior to the date of final inspection, or issuance of a certificate of occupancy, whichever occurs first.
However, "utility service fees" (not defined, but likely referring to water and sewer connections) may be collected upon application for utility service. In a residential development project of more than one dwelling unit, Section 66007 (a) allows the agency to choose to collect fees either for 2 According to Gov’t Code Section 66001 (a) (2), the use of the fee may be specified in a capital improvement plan, the General Plan, or other public documents that identify the public facilities for which the fee is charged. The findings recommended here identify this impact fee study as the source of that information. Also note that Section 66016.5 (a)(6) requires that large jurisdictions adopt a capital improvement plan as part of an impact fee nexus study. That requirement applies in counties of 250,000 or more and cities in those counties.
City of Covina Page 10-3
Development Impact Fee Study
July 7, 2023
individual units or for phases upon final inspection, or for the entire project upon final inspection of the first dwelling unit completed.
Section 66007 (b) provides two exceptions when the local agency may require the payment of fees from developers of residential projects at an earlier time: (1) when the local agency determines that the fees “will be collected for public improvements or facilities for which an account has been established and funds appropriated and for which the local agency has adopted a proposed construction schedule or plan prior to final inspection or issuance of the certificate of occupancy” or (2) the fees are “to reimburse the local agency for expenditures previously made.”
Statutory restrictions on the time at which fees may be collected do not apply to non-residential development.
Notwithstanding the foregoing restrictions, some cities collect impact fees for all facilities at the time building or grading permits are issued, and builders may find it convenient to pay the fees at that time.
In cases where the fees are not collected upon issuance of building permits, Sections 66007 (c) (1) and (2) provide that the City may require the property owner to execute a contract to pay the fee, and to record that contract as a lien against the property until the fees are paid.
Earmarking and Expenditure of Fee Revenue. Section 66006 (a) mandates that fees be deposited “with other fees for the improvement in a separate capital facilities account or fund in a manner to avoid any commingling of the fees with other revenues and funds of the local agency, except for temporary investments, and expend those fees solely for the purpose for which the fee was collected.” Section 66006 (a) also requires that interest earned on the fee revenues be placed in the capital account and used for the same purpose.
The language of the law is not clear as to whether depositing fees "with other fees for the improvement" refers to a specific capital improvement or a class of improvements (e.g., street improvements).
We are not aware of any municipality that has interpreted that language to mean that funds must be segregated by individual projects. And, as a practical matter, that approach would be unworkable because it would mean that no pay-as-you-go project could be constructed until all benefiting development had paid the fees. Common practice is to maintain separate funds or accounts for impact fee revenues by facility category (i.e., streets, park improvements), but not for individual projects.
Impact Fee Exemptions, Reductions, and Waivers. In the event that a development project is found to have no impact on facilities for which impact fees are charged, such project must be exempted from the fees.
If a project has characteristics that will make its impacts on a particular public facility or infrastructure system significantly and permanently smaller than the average impact used to calculate impact fees in this study, the fees should be reduced accordingly to meet the requirement that there must be a reasonable relationship between the amount of the fee and
City of Covina Page 10-4
Development Impact Fee Study
July 7, 2023
the cost of the public facility attributable to the development on which the fee is imposed. The fee reduction is required if the fee is not proportional to the impact of the development on relevant public facilities.
In some cases, an agency may desire to voluntarily waive or reduce impact fees that would otherwise apply to a project as a way of promoting goals such as affordable housing or economic development. Such a waiver or reduction is within the discretion of the governing body but may not result in increased costs to other development projects. So, the effect of such policies is that the lost revenue must be made up from sources other than impact fees.
Credit for Improvements Provided by Developers. If the City requires a developer, as a condition of project approval, to dedicate land or construct facilities or improvements for which impact fees are charged, the City should ensure that the impact fees are adjusted so that the overall contribution by the developer does not exceed the impact created by the development.
In the event that a developer voluntarily offers to dedicate land, or construct facilities or improvements in lieu of paying impact fees, the City may accept or reject such offers, and may negotiate the terms under which such an offer would be accepted. Excess contributions by a developer may be offset by reimbursement agreements.
Credit for Existing Development. If a project involves replacement, redevelopment or intensification of previously existing development, impact fees should be applied only to the portion of the project that represents a net increase in demand for relevant City facilities, applying the measure of demand used in this study to calculate that impact fee.
Annual Report. Section 66006 (b) (1) requires that once each year, within 180 days of the close of the fiscal year, the local agency must make available to the public the following information for each separate account established to receive impact fee revenues:
1. A brief description of the type of fee in the account or fund;
2. The amount of the fee;
3. The beginning and ending balance of the account or fund;
4. The amount of the fees collected and interest earned;
5. Identification of each public improvement on which fees were expended and the amount of the expenditures on each improvement, including the percentage of the cost of the public improvement that was funded with fees;
6. Identification of the approximate date by which the construction of a public improvement will commence, if the City determines sufficient funds have been collected to complete financing of an incomplete public improvement;
7. A description of each inter-fund transfer or loan made from the account or fund, including interest rates, repayment dates, and a description of the improvement on which the transfer or loan will be expended;
City of Covina Page 10-5
Development Impact Fee Study
July 7, 2023
8. The amount of any refunds or allocations made pursuant to Section 66001, paragraphs (e) and (f).
The annual report must be reviewed by the City Council at its next regularly scheduled public meeting, but not less than 15 days after the statements are made public, per Section 66006 (b) (2).
Five-Year Findings and Refunds under the Mitigation Fee Act. Prior to 1996, The Mitigation Fee Act required that a local agency collecting impact fees was required to expend or commit impact fee revenue within five years or make findings to justify a continued need for the money.
Otherwise, those funds had to be refunded. SB 1693, adopted in 1996 as an amendment to the Mitigation Fee Act, changed that requirement in material ways.
Now, Section 66001 (d) requires that, for the fifth fiscal year following the first deposit of any impact fee revenue into an account or fund as required by Section 66006 (b), and every five years thereafter, the local agency shall make all of the following findings for any fee revenue that remains unexpended, whether committed or uncommitted:
1. Identify the purpose to which the fee will be put;
2. Demonstrate the reasonable relationship between the fee and the purpose for which it is charged;
3. Identify all sources and amounts of funding anticipated to complete financing of incomplete improvements for which impact fees are to be used;
4. Designate the approximate dates on which the funding necessary to complete financing of those improvements will be deposited into the appropriate account or fund.
Those findings are to be made in conjunction with the annual reports discussed above. If such findings are not made as required by Section 66001, the local agency could be required to refund the moneys in the account or fund, per Section 66001 (d).
Once the agency determines that sufficient funds have been collected to complete financing on incomplete improvements for which impact fee revenue is to be used, it must, within 180 days of that determination, identify an approximate date by which construction of the public improvement will be commenced (Section 66001 (e)). If the agency fails to comply with that requirement, it must refund impact fee revenue in the account according to procedures specified in Section 66001 (d).
For a useful discussion of the foregoing requirements, see “The Mitigation Fee Act’s Five-Year Findings Requirement: Beware Costly Pitfalls” by Glen Hansen, Senior Counsel, Abbott and Kindermann, and Rick Jarvis, Managing Partner, Jarvis, Fay and Gibson, presented at the 2022 League of California Cities City Attorneys Spring Conference.
Audit Requests. Section 66023 provides that any person may request an audit to determine whether any fee or charge levied by a local agency exceeds the amount reasonably necessary to cover the cost of any product, public facility, as defined in Section 66000, or service provided by
City of Covina Page 10-6
Development Impact Fee Study
July 7, 2023
the local agency. The legislative body of the local agency may retain an independent auditor to conduct the audit but is not required to conduct an audit if an audit has been performed for the same fee within the previous 12 months.
The agency shall retain an independent auditor to conduct an audit only if the person who requests the audit deposits with the local agency the amount of the local agency’s reasonable estimate of the cost of the independent audit. At the conclusion of the audit, the local agency shall reimburse unused sums, if any, or the requesting person shall pay the local agency the excess of the actual cost of the audit over the amount that was deposited.
However, if the local agency fails to comply with the annual report requirement of Section 66006 following the establishment, increase or imposition of a fee, but requires payment of that fee in connection with the approval of a development project for three consecutive years, the agency shall not require a deposit for the independent audit and shall pay the cost of the audit.
Indexing of In-Lieu/Impact Fees. In-lieu fees and impact fees calculated in this report are based on current costs and should be adjusted periodically to account for changes in the cost of facilities or other capital assets that will be funded by those fees. That adjustment is intended to account for escalation in costs for land, construction, vehicles and other relevant capital assets. The Engineering News Record Building Cost Index (BCI) and Construction Cost Index (CCI) are useful for indexing construction costs. Where land costs are covered by an impact fee or in-lieu fee, land costs should be adjusted based on changes in local land prices.
Requirements Imposed by AB 602
In 2021, the California Legislature passed AB 602 and the Governor signed it into law. AB 602 creates some new requirements for impact fees that will go into effect in 2022. The new law amends Government Code Section 65940.1 and adds Section 66016.5 to impose the following requirements:
1) A city, county or special district that has an internet website shall post on its website:
a) A current written schedule of fees, exactions and affordability requirements applicable to a proposed housing development project, and shall present that information in a manner that identifies the fees, exactions and affordability requirements that apply to each parcel and the fees that apply to each new water and sewer utility connection b) All zoning ordinances and development standards and specifying the zoning, design and development standards that apply to each parcel
c) A list of the information that will be required from any applicant for a development project, as specified in Government Code Section 69540
d) The current and five previous annual fee reports required by Government Code Section 66006 and Subsection 66013 (d).
e) An archive of impact fee nexus studies, cost of service studies or equivalent conducted on or after January 1, 2018.
City of Covina Page 10-7
Development Impact Fee Study
July 7, 2023
2) The above information shall be updated within 30 days of any changes 3) A City or County shall request from a development proponent, upon issuance of a certificate of occupancy or final inspection, the total amount of fees and exactions associated with the project for which the certificate it issued. That information must be posted on the website and updated at least twice a year.
4) Before adoption of an impact fee, an impact fee nexus study shall be adopted. 5) When applicable, the nexus study shall identify the existing level of service for each public facility, identify the proposed new level of service and explain why the new level of service is appropriate
6) If a nexus study supports the increase of an existing fee, the local agency shall review the assumptions of the nexus study supporting the original fee and evaluate the amount of the fees collected under the original fee.
7) A nexus study adopted after July 1, 2022, shall calculate a fee imposed on a housing development project proportionately to the square footage of the proposed units of the development. A local agency that imposes a fee proportionately to the square footage if the proposed units of the development shall be deemed to have used a valid method to establish a reasonable relationship between the fee charged and the burden posed by the development. A nexus study is not required to comply with this requirement if the agency makes certain findings outlined in the statute.
8) Large jurisdictions as defined in Section 53559.1 (d) of the Health and Safety Code (counties of 250,000 or more and cities in those counties) shall adopt a capital improvement plan as part of a nexus study.
9) All studies shall be adopted at a public hearing with at least 30-days’ notice, and the local agency shall notify any member of the public that requests notice of intent to begin an impact fee nexus study of the date of the hearing.
10) Studies shall be updated at least every eight years, beginning on January 1, 2022.
Training and Public Information
Effective administration of an impact fee program requires considerable preparation and training. It is important that those responsible for collecting the fees, and for explaining them to the public, understand both the details of the fee program and its supporting rationale.
It is also useful to pay close attention to handouts that provide information to the public regarding impact fees. Impact fees should be clearly distinguished from other fees, such as user fees for application processing, and the purpose and use of particular impact fees should be made clear.
Finally, anyone responsible for accounting, capital budgeting, or project management for projects involving impact fees must be fully aware of the restrictions placed on the expenditure of impact fee revenues. Fees must be expended for the purposes identified in the impact fee
City of Covina Page 10-8
Development Impact Fee Study
July 7, 2023
nexus study in which they were calculated, and the City must be able to show that funds have been properly expended.
Recovery of Administrative Costs
To recover the cost of periodic impact fee update studies and ongoing staff costs for capital budgeting, annual reports, five-year updates and other requirements of the Mitigation Fee Act, an administrative charge may be added to the impact fees calculated in this report. See the Executive Summary for a discussion of an administrative charge to recover some costs for administration and updating of impact fees.
APPENDIX A
Fee Comparison
Prepared by NBS for the City of Covina
APPENDIX A
City of Covina 2023 Impact Fee Study - Fee Comparison
Development Impact Fee Type Units 1 Current Fee 2 Proposed Fee 3 CLAREMONT 4 GLENDORA 5 MONTEREY PARK 6 SAN DIMAS 7 SAN GABRIEL 8 WEST COVINA 9 Residential - Single-Family
Park Land and Improvements DU $ 7,280 5,380 $ $ 4,400 2,273 $ 4,409 $ 600 $ 3,392 $ 2,198 $ Recreation Facilities DU $ 1,124 792 $ Public Buildings (Incl Libraries) DU $ 2,907 1,674 $ $ County Library 1,851 $ 194Police DU $ 409 956 $ $ Sheriff Contract 903 526 $ 732 $ Fire DU $ 373 458 $ 360 $ $ Fire District 272 640 $ 893 $ Streets/Signals DU $ 12,287 2,334 $ 298 $ $ 1,791 $ 2,753 Total Residential - Single-Family $ 24,380 11,594 $ 5,058 $ 2,273 $ 9,217 $ 600 $ 7,320 $ 4,017 $ Residential - Multi-Family Park Land and Improvements DU $ 2,768 4,149 $ $ 4,400 1,591 $ 4,473 $ 400 $ 3,392 $ 1,570 $ Recreation Facilities DU $ 427 610 $ Public Buildings (Incl Libraries) DU $ 1,110 1,292 $ $ County Library 1,878 $ 137Police DU $ 369 737 $ $ Sheriff Contract 903 503 $ 523 $ Fire DU $ 231 353 $ 150 $ $ Fire District 272 418 $ 637 $ Streets/Signals DU $ 8,095 1,867 $ 210 $ $ 1,129 $ 2,753 Total Residential - Multi-Family $ 13,000 9,008 $ 4,760 $ 1,591 $ 8,401 $ 400 $ 7,320 $ 2,867 $
CITY OF COVINA COMPARISON AGENCIES
NBS - Local Government Solutions
APPENDIX A
City of Covina 2023 Impact Fee Study - Fee Comparison
Development Impact Fee Type Units 1 Current Fee 2 Proposed Fee 3 CLAREMONT 4 GLENDORA 5 MONTEREY PARK 6 SAN DIMAS 7 SAN GABRIEL 8 WEST COVINA 9
CITY OF COVINA COMPARISON AGENCIES
Commercial
Park Land and Improvements KSF n/a n/a $ 64 620 $ 150 $ $ 840Recreation Facilities KSF n/a n/aPublic Buildings (Incl Libraries) KSF $ 859 192 $ $ 70Police KSF $ 1,983 177 $ $ Sheriff Contract 260 370 $ 280 $ Fire KSF $ 498 85 $ 200 $ $ Fire District 1,170 350 $ 340 $ Streets/Signals KSF $ 33,047 5,799 $ 1,140 $ $ 10,393 3,216 $ Total Commercial $ 36,387 6,253 $ 1,340 $ 620 $ 4,000 $ 150 $ 11,823 $ 1,530 $ Office Park Land and Improvements KSF n/a n/a $ 64 620 $ 150 $ $ 840Recreation Facilities KSF n/a n/aPublic Buildings (Incl Libraries) KSF $ 627 255 $ $ 70Police KSF $ 160 237 $ $ Sheriff Contract 260 370 $ 280 $ Fire KSF $ 178 113 $ 200 $ $ Fire District 1,170 350 $ 340 $ Streets/Signals KSF $ 16,624 5,116 $ 690 $ $ 3,216 $ 3,048 Total Office $ 17,589 5,721 $ 890 $ 620 $ 4,000 $ 150 $ 4,478 $ 1,530 $ Industrial Park Land and Improvements KSF n/a n/a $ 32 620 $ 150 $ $ 840Recreation Facilities KSF n/a n/aPublic Buildings (Incl Libraries) KSF $ 228 128 $ $ 70Police KSF $ 83 118 $ $ Sheriff Contract 260 50 $ 280 $ Fire KSF $ 124 57 $ 200 $ $ Fire District 1,170 19 $ 340 $ Streets/Signals KSF $ 5,927 1,870 $ 200 $ $ 1,305 $ 1,365 Total Industrial $ 6,362 2,173 $ 400 $ 620 $ 1,406 $ 150 $ 2,795 $ 1,530 $ Notes:
1 DU = dwelling unit; KSF = 1,000 gross sq ft of building area2 Covina existing impact fees adopted in 20053 Proposed impact fees from NBS 2023 Impact Fee Study; proposed single-family residential impact fees based on the 1,200-1,900 square foot fee category; proposed multi-family residential impact fees based on the 600-800 square foot fee category 4 Claremont impact fees effective August 15, 20225 Glendora impact fees effective July 1, 20226 Monterey Park impact fees effective July 1, 20227 San Dimas impact fees effective July 1, 20228 San Gabriel impact fees effective August 1, 2018; the San Gabriel non-residential impact fees for streets and signals depend on trip generation rates; this table uses trip generation rates from the Institute of Transportation Engineers manual, Trip Generation , 10th Ed., as follows (commercial - 37.75 ADT per KSF (Shopping Center); Office - 11.07 ADT per KSF (Office Park); Industrial - 4.97 ADT per KSF ( Gen. Lt. Industrial) 8 West Covina impact fees effective July 1, 2019
NBS - Local Government Solutions
APPENDIX A
City of Covina 2023 Impact Fee Study - Fee Comparison
CLAREMONT 4 GLENDORA 5 MONTEREY PARK 6 SAN DIMAS 7 SAN GABRIEL 8 WEST COVINA 9 Consumer Price Index (CPI) None No response None
Construction Cost Index published by Engineering News Record Construction Cost Index published by Engineering News Record Approximately 2013 No Study on file No response Study in progress No Study performed since fees were enacted.
2015
Fire and Libraries
Fire provided by LA County Fire District
No response
County provides Police, Fire, and Libraries
None County Library
No official policy but Council can waive fees at their discretion None No response None None
Reduction or Waiver for affordable housing units that are deed restricted to verylow income and low income households Does the City's have a policy regarding waiver or reduction of impact fees for affordable housing or other types of development?
SURVEY QUESTION
CITY OF COVINA COMPARISON AGENCIES
Are the City's impact fees escalated annually by CPI, ENR or other index?When was the City's last comprehensive impact fee study completed?Which of the City's services, if any, are provided by contract or special district? NBS - Local Government Solutions
Item Project Title Project Location Funding Source(1) 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029 1 Street Residential Resurfacing Project City-Wide Measure M, Measure R, Sewer $ 880,000 $ 800,000 $ 800,000 $ 800,000 800,000 $ 2 Vincent Avenue Rehabilitation Project From Badillo Street to Northerly City Limit Prop C $ 1,500,000 3 Pavement Management Program City-Wide TIF, Gas Tax 60,000 $ 60,000 $ 4 Badillo Street Resurfacing Project From Azusa Avenue to Lark Ellen Avenue SB-1 $ 1,300,0005 City-Wide Alleyway Resurfacing Project City-Wide Gas Tax $ 130,000 $ 100,000 $ 100,000 $ 100,000 6 Miscellaneous Concrete Repair Project City-Wide Gas Tax $ 200,000 $ 200,000 7 Traffic Signal Installation Project 4th Avenue & Badillo Street Prop C $ 900,000 $ 300,000 $ 300,000 $ 300,000 8 Traffic Signal Upgrade - Citrus Avenue & Puente Avenue Project Citrus Avenue & Puente Avenue Measure R $ 250,0009 Traffic Calming Improvements Project City-Wide Measure M $ 100,000 $ 100,000 $ 100,000 $ 100,000 10 San Bernardino Avenue Street Rehabilitation Project - Phase I From Vincent Avenue to Azusa Avenue SB-1 $ 1,000,000 11 San Bernardino Avenue Street Rehabilitation Project - Phase II From Hollenbeck to Citrus Avenue SB-1 $ 1,000,000 12 San Bernardino Avenue Street Rehabilitation Project - Phase III From Citrus Avenue to Grand Avenue SB-1 $ 1,500,000 13 2nd Avenue Street Improvements Project (Design Only) From Workman Avenue to Front Street Grants $ 350,000 14 Tree Planting Project City-Wide Environmental $ 50,000 $ 50,000 $ 50,000 $ 50,000 Total $ 3,610,000 $ 2,960,000 $ 2,350,000 $ 3,110,000 $ 2,300,000
CITY OF COVINA
CAPITAL IMPROVEMENT PROGRAM
FISCAL YEARS 2025-2029
ENGINEERING
Exhibit B
Item Project Title Project Location Funding Source(1) 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
CITY OF COVINA
CAPITAL IMPROVEMENT PROGRAM
FISCAL YEARS 2025-2029
15 Hurst Tract Water Main Replacement Project From Cypress Avenue to Covina Boulevard and Grand Avenue to Brightview Drive Water $ 1,500,000 16 Edna Place Pipe Improvements Project Grand Avenue to Barranca Avenue Water $ 6,000,000 17 Navilla and Forestdale Main Replacement Project From Puente Street to Rowland Avenue and From Grand to Barranca Avenue Water $ 5,000,000 18 Azusa Avenue Main Installation Project From Badillo Street to Edna Place Water $ 2,500,00019 Fourth Avenue Water Main Replacement Project From Badillo Street to San Bernardino Road Water $ 1,000,000 20 Cypress Avenue Water Main Replacement Project From Citrus Avenue to Barranca Avenue Water $ 4,000,000 21 Badillo Street Water Main Replacement Project From Rimsdale Avenue to Lark Ellen Avenue Water $ 1,250,000 $ 2,000,000 22 Cypress Reservior Water Booster Improvement Project 1051 E. Cypress Street Water $ 800,000 23 Rancho La Merced Water Improvement Project (Design Only) Rancho La Merced Water $ 100,000 24 Water Master Plan & Rate Update City-Wide Water $ 250,000 25 Loma Vista St & Orange Circle Water Main Replacement Project Loma Vista St/Orange Circle Water $ 750,000 26 San Joaquin Road and Rambling Road Main Replacement From Covina Hills to Navilla Place Water $ 4,000,000 Total $ 2,400,000 $ 3,250,000 $ 9,000,000 $ 8,500,000 $ 6,000,000 WATER
Item Project Title Project Location Funding Source(1) 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
CITY OF COVINA
CAPITAL IMPROVEMENT PROGRAM
FISCAL YEARS 2025-2029
27 Sunkist Park Improvement Project Sunkist Park Unfunded $ 1,500,000 28 Covina Park Tennis Court Renovation Covina Park Measure CC $ 350,000 29 Covina Park Aquatic Center Project (Design & Specs Only) Covina Park Measure CC TBD $ 1,000,000 30 Sunkist Park Urban Greening Revitalization Project Sunkist Park Grants $ 2,000,000 31 Covina Senior & Community Center - Bioswale Design & Construction Project Sunkist Park Measure W $ 235,000 32 Covina Recreation Village Project - Furniture, Fixtures & Equipment Covina Recreation Village Unfunded $ 800,000 Total $ 2,235,000 $ 1,150,000 $ 1,000,000 $ 1,500,000 $ -
PARKS AND RECREATION
Item Project Title Project Location Funding Source(1) 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
CITY OF COVINA
CAPITAL IMPROVEMENT PROGRAM
FISCAL YEARS 2025-2029
33 City Facility Renovation Project City-Wide Measure CC $ 200,000 $ 100,000 $ 100,000 34 PD Generator Installation Project Police Department Building Maintenance $ 500,00035 Covina Police Communications and RealTime Watch Center Police Department TBD TBD 36 Covina Recreation Village Project Vita Pakt
Measure W, Grants,
Impact Fees - Library,
Impact Fees - Park Fac
TBD
Total $ - $ 700,000 $ 100,000 $ 100,000 $ -
FACILITIES
Item Project Title Project Location Funding Source(1) 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
CITY OF COVINA
CAPITAL IMPROVEMENT PROGRAM
FISCAL YEARS 2025-2029
37 City Wide Manhole Adjustment Project City-Wide Sewer $ 100,000 $ 50,000 $ 50,000 $ 50,000 38 Sewer Main Replacement Project City-Wide Sewer $ 100,000 $ 100,000 $ 100,000 39 Sewer System Master Plan (SSMP) City-Wide Sewer $ 100,000 Total $ 200,000 $ 150,000 $ 150,000 $ 150,000 $ -
SEWER
Item Project Title Project Location Funding Source(1) 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
CITY OF COVINA
CAPITAL IMPROVEMENT PROGRAM
FISCAL YEARS 2025-2029
40 Quiet Zone Assessment Project (Design Only) Railroad Xing TBD $ 1,000,000 $ 3,000,000 $ 3,000,000 $ 3,000,000 41 Metrolink Pedestrian Bridge & Front Street Improvements Project Front Street to Covina Recreation Village Grants $ 4,000,000 $ 1,200,000 $ 3,800,000 42 Bus Shelter Installation Project City Wide Prop A $ 100,000 $ 100,000 $ 100,000 $ 100,000 Total $ 5,100,000 $ 4,300,000 $ 3,100,000 $ 6,900,000 $ -
TRANSPORTATION
Item Project Title Project Location Funding Source(1) 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
CITY OF COVINA
CAPITAL IMPROVEMENT PROGRAM
FISCAL YEARS 2025-2029
43 Trash Enclosure Project City-Wide Environmental $ 150,000 $ 150,000 $ 150,000 $ 150,000 44 Frontage Median Bioswale Installation Project City-Wide Measure W $ 250,000 $ 150,000 $ 150,000 $ 150,000 45 Wingate Park Regional EWMP Project - Construction City-Wide Grants TBD Total $ 400,000 $ 300,000 $ 300,000 $ 300,000 $ -
ENVIRONMENTAL
Item Project Title Project Location Funding Source(1) 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
CITY OF COVINA
CAPITAL IMPROVEMENT PROGRAM
FISCAL YEARS 2025-2029
46 Downtown Restaurant Improvements Project 100 N. Citrus Avenue Building Maintenance TBD 47 100-112 N. Citrus Avenue HVAC Replacement Project 100-112 N. Citrus Avenue Energy Grant/Covina Theater $ 500,000 48 Covina Theater - Lincoln Box Replacement Project 104 N. Citrus Avenue Covina Theater $ 500,000 Total $ - $ 500,000 $ 500,000 $ - $ -
COVINA THEATER
Item Project Title Project Location Funding Source(1) 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
CITY OF COVINA
CAPITAL IMPROVEMENT PROGRAM
FISCAL YEARS 2025-2029
49 Frontier Building - Purchase/Improvements 176 E. Badillo Street General Fund, Grants/Housing Authority $ 200,000 50 Royal Oak Middle School Playground & Ballfields Construction Project 303 Glendora Avenue TBD 1,000,000 $ 51 Navigation Center Navigation Center Prop C/Sewer/Water 1,000,000 $ Total $ 2, 200,000 $ 000,000 $ - $ - $ -
COMMUNITY DEVELOPMENT
Item Project Title Project Location Funding Source(1) 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
CITY OF COVINA
CAPITAL IMPROVEMENT PROGRAM
FISCAL YEARS 2025-2029
52 City Hall & PW Yard Master Plan & Design Project City Hall & Public Works Yard Impact Fees - Gen Govt $ 231,178 Total $ 231,178 $ - $ - $ - $ -
IMPACT FEES - GENERAL GOVERNMENT
Item Project Title Project Location Funding Source(1) 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
CITY OF COVINA
CAPITAL IMPROVEMENT PROGRAM
FISCAL YEARS 2025-2029
53 Covina Recreation Village Project - Furniture, Fixtures & Equipment Covina Recreation Village Impact Fees - Library $ 190,003 Total $ - $ 190,003 $ - $ - $ -
IMPACT FEES - LIBRARY
Item Project Title Project Location Funding Source(1) 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
CITY OF COVINA
CAPITAL IMPROVEMENT PROGRAM
FISCAL YEARS 2025-2029
54 PD Building Feasibility Study Project Police Department Impact Fees - PD $ 40,826 Total $ - $ - $ - $ - $ 40,826
IMPACT FEES - POLICE DEPARTMENT
Item Project Title Project Location Funding Source(1) 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
CITY OF COVINA
CAPITAL IMPROVEMENT PROGRAM
FISCAL YEARS 2025-2029
55 Park Master Plan Analysis Project City-Wide Impact Fees - Park Fac $ 14,632 Total $ - $ - $ - $ - $ 14,632
IMPACT FEES - PARK FACILITIES
Item Project Title Project Location Funding Source(1) 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
CITY OF COVINA
CAPITAL IMPROVEMENT PROGRAM
FISCAL YEARS 2025-2029
56 TS Upgrade - 2nd Ave & College Street 2nd Ave & College Street Impact Fees - Streets 248,415 $ Total $ - $ - 248,415 $ - $ - $
IMPACT FEES - STREETS
Item Project Title Project Location Funding Source(1) 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
CITY OF COVINA
CAPITAL IMPROVEMENT PROGRAM
FISCAL YEARS 2025-2029
57 LA County Fire Department - Building Expansion Study Due to Growth Various LACFD Sites - Owned by the City of Covina Impact Fees - Fire $ 115,353 Total $ - $ - $ - $ - $ 115,353
Grand Total $ 14,376,178 $ 15,748,418 $ 16,500,000 $ 20,560,000 $ 8,470,811
IMPACT FEES - FIRE
EXHIBIT “C”
City of Covina Development Impact Fee (DIF) Schedule
Adopted July 16, 2024
The Development Impact Fee Schedule shall be adjusted annually in July of each calendar year, using the Construction Cost Index (CCI) for the Los Angeles Region as reported by Engineering News Record (ENR) for the twelve-month period ending in May or a similar published index if the CCI Index is no longer available.
Definitions:
Residential Unit: Residential Unit shall have the same definition as provided within the most current California Building Code. Residential units may consist of but are not limited to attached and detached single-family structures/units, attached or detached duplexes, condominiums, mobile homes, apartments, or dormitories. Commercial: All commercial, retail, educational, and hotel/motel development. Office: All general, professional, and medical office development. Industrial: All manufacturing and warehouse development. SF: Square Foot 1 This impact fee only applies to development projects for which no subdivision of land is involved. For projects involving land subdivisions, the required amount of land dedications and/or in-lieu fee payments for public park development shall be governed by Covina’s “Quimby Act” ordinance located at Covina Municipal Code, Chapter 16.28.
Per
Park
Land
Impact Fee
Park
Improvements
Impact Fee1
Community &
Recreation
Centers Impact Fee
Library
Impact Fee
General
Government
Impact Fees
Police
Impact Fee
Fire
Impact Fee
Streets
Impact Fee
Traffic Signal
Impact Fee
Administrative
Fee Total
Residential Development
Residential unit
< 600 SF
$1,231 $820 $316 $432 $387 $349 $160 $5,702 $659 $60 $10,116 Residential unit
600-800 SF
$1,661 $1,107 $427 $583 $523 $369 $231 $7,257 $838 $78 $13,075 Residential unit
>800-1,200 SF
$2,769 $1,846 $712 $971 $871 $389 $302 $9,072 $1,048 $107 $18,087 Residential unit
>1,200-1,900 SF
$4,368 $2,912 $1,124 $1,533 $1,374 $409 $373 $11,015 $1,272 $147 $24,527 Residential unit
>1,900-2,300 SF
$5,845 $3,896 $1,503 $2,051 $1,839 $429 $445 $12,830 $1,482 $181 $30,501 Residential unit
>2,300
$7,075 $4,717 $1,820 $2,482 $2,226 $449 $516 $14,255 $1,646 $211 $35,398 Nonresidential Development
Each SF
Commercial
N/A N/A N/A N/A $0.859 $1.983 $0.498 $29.625 $3.422 $0.218 $36.606 Each SF Office N/A N/A N/A N/A $0.627 $0.16 $0.178 $14.903 $1.721 $0.105 $17.695 Each SF
Industrial
N/A N/A N/A N/A $0.228 $.083 $0.124 $5.313 $0.614 $0.038 $6.401 Other
developments not
defined
N/A N/A N/A N/A $388
x # employees X
0.54 $401 per call
per year
$1,778 per
call per year
$12,959 per peak
hour trip
$1,497 per peak
hour trip
Calculated as the
subtotal X 0.6%
Calculated as the
sum of the total of
all values in the
previous columns
CC Regular Meeting
AGENDA ITEM REPORT
ITEM NO. PH 3
Meeting: July 16, 2024
Title: Adopt Resolution Confirming the Engineer’s Report Dated June 18, 2024 and Ordering the Levying of Assessments on Covina Landscaping District No. 1 for Fiscal Year 2025 Presented by: Rafael Fajardo, Interim Director of Public Works/City Engineer Sandy Costandy, Senior Management Analyst
Recommendation: 1. Conduct the public hearing and consider all testimony that may be presented; and
2. Adopt Resolution CC 2024-53 confirming the Engineer’s Report dated June 18, 2024 and ordering the levying of assessments on the Covina Landscaping District No. 1 for Fiscal Year 2025.
EXECUTIVE SUMMARY/BACKGROUND:
On June 18, 2024, the City Council adopted Resolution CC 2024-37 ordering the City’s Assessment Engineer to prepare and file a report levying assessments within the Covina Landscaping District No. 1 for FY 2024-2025 and Resolution CC 2024-38 approving the Engineer’s Report and declaring its intention to levy and collect assessments on the Covina Landscaping District No. 1 for FY 2024-2025 and appointing Tuesday, July 16, 2024, at 7:30 p.m. in the Council Chamber, 125 East College Street, Covina, California, as the time and place for hearing protests in relation thereto.
The Covina Landscaping District No. 1 (hereafter referred to as “District”) was formed April 6, 1981, pursuant to the provisions of the California Streets and Highways Code, Division 15, Part 2, Landscaping and Lighting Act of 1972 (hereafter referred to as “1972 Act”), in order to provide and maintain public landscape improvements in specified areas within the City of Covina.
Each fiscal year, prior to collecting assessments on the LA County tax roll, the City Council must adopt resolutions directing the City’s Assessment Engineer to prepare and file a report regarding the proposed assessment for each Zone, approving the Engineer’s Report, declaring the City Council’s intention to levy and collect assessments for the upcoming fiscal year, and ordering the levy. The 2024-2025 Engineer’s Report for the Covina Landscaping District No. 1 (Attachment A) was prepared for review and presented for consideration during the City Council meeting of June 18, 2024. There were no objections made, and therefore, the Engineer’s Report is now presented for approval. Additionally, a public hearing on this matter will be conducted as required in order to receive any protests related to the levy and collection of assessments on the Covina Landscaping District No. 1 for FY 2024-2025.
DISCUSSION:
The revenue collected from assessed properties provides funds for the landscape maintenance of eighteen (18) active zones in the City as described below. A City contractor maintains the landscape improvements within each Zone.
Zone 1 - Parque Xalapa Area
Description: Located in the southeast region of the City, south of Covina Hills Road, north of Holt Avenue and the San Bernardino Freeway, and east of Grand Avenue. The Zone was established in 1981. The annual assessments provide for landscape maintenance in Parque Xalapa, Forest Hills Drive, the Covina Hills Road Slope, and Oak Tree Park.
Assessment Methodology: Based on lot size and capped per Proposition 218; recommend continuing the maximum assessment of $56.55 per 1,000 square feet of lot size to cover zone expenses. Zone 2 - Arrow Grand Circle Area
Description: Located in the north-central region of the City, south of Arrow Highway, north of Cienega Avenue, and west of Grand Avenue. The Zone was established in April 1981. The annual assessments provide for landscape maintenance at the entrances to Arrow Grand Circle off of Arrow Highway, as well as the north side of Cienega Avenue between Grand Avenue and Barranca Avenue that is adjacent to the properties within the Zone.
Assessment Methodology: Based on lot size and capped per Proposition 218; recommend continuing the maximum assessment of $17.00 per 1,000 square feet of lot size to cover zone expenses. Zone 3 – Golden Grove Way Area
Zone has not been levied since FY 1983-84. The association of property owners along Golden Grove Way took over the maintenance of the landscape improvements originally associated with this Zone. Zone 4 – Four Residential Developments Near Arrow Highway/Puente Street Description: Comprised of four residential developments (single-family and condominium) generally located south of Arrow Highway and north of Puente Street along the Azusa Avenue corridor. These four residential developments are inclusive of Tract 15506, Tract 14394, Tract 18642, Tract 33882, and Tract 34224. The Zone was added to the Covina Landscaping District No. 1 in FY 1986-87. The annual assessments provide for the maintenance of street landscaping (including street tree maintenance) associated with the properties, as well as a portion of the maintenance costs of Azusa Avenue landscaping (15% of the cost).
Assessment Methodology: Based on dwelling units and capped per Proposition 218; recommend continuing the maximum assessment of $21.90 per dwelling unit to cover zone expenses. Zone 5 – Azusa Avenue
Description: Comprised of commercial/industrial properties generally located south of Arrow Highway and north of Badillo Street along the Azusa Avenue corridor. The Zone was added to the Covina Landscaping District No. 1 in FY 1986-87. The annual assessments provide for the maintenance of street landscaping (including street tree maintenance) specifically associated with these properties including 85% of the maintenance costs of Azusa Avenue landscaping.
Assessment Methodology: Based on lot size and capped per Proposition 218; recommend continuing the maximum assessment of $10.00 per 1,000 square feet of lot size to cover zone expenses. Zone 6 – Dalton Place
Description: Annexed into the Covina Landscaping District No. 1 in FY 2017-18. The Zone is comprised of 63 single family residential units, inclusive of Tract 73455. Improvements within this area consist of approximately 6,143 square feet of parkway landscaping and 28 street trees. The annual assessments provide for the maintenance of the parkways and street trees specifically associated with these properties.
Assessment Methodology: Based on dwelling units and adjusted annually by the change in the Consumer Price Index up to a maximum of 3%; recommend the assessment of $135.71 per dwelling unit to cover zone expenses.
Zone 7 – Citrus Promenade
Description: Annexed into the Covina Landscaping District No. 1 in FY 2018-19. The Zone is comprised of 117 townhomes, inclusive of Tract No. 74512-1. Improvements within this area consist of median and
parkway landscaping along Citrus Avenue. The annual assessments provide for the maintenance of the median and parkways associated with this development.
Assessment Methodology: Based on dwelling units and adjusted annually by the change in the Consumer Price Index up to a maximum of 3%; recommend the assessment of $100.64 per dwelling unit to cover zone expenses.
Zone 8 – Three Residences on Dexter Street
Description: Annexed into the Covina Landscaping District No. 1 in FY 2018-19. The Zone is comprised of three townhomes, located south of Dexter Street and east of Fourth Avenue. Improvements within this area consist of four street trees. The annual assessments provide for the maintenance of the street trees specifically associated with these properties.
Assessment Methodology: Based on dwelling units and adjusted annually by the change in the Consumer Price Index up to a maximum of 3%; recommend the assessment of $60.55 per dwelling unit to cover zone expenses.
Zone 9 – Four Residences on Ruddock Street
Zone has not been levied since FY 2023-24. The development was expected to build out to a four lot residential subdivision. However, the development was never constructed. Zone 10 – Atwood
Description: Annexed into the Covina Landscaping District No. 1 in FY 2019-20. The Zone is comprised of 52 townhomes, four live/work lofts, and three office/retail units, located north of Orange Street and west of Citrus Avenue. Improvements within this area consist of 31 street trees. The annual assessments provide for the maintenance of the street trees specifically associated with this development.
Assessment Methodology: Based on dwelling units or commercial lot size and adjusted annually by the change in the Consumer Price Index up to a maximum of 3%; recommend the assessment of $37.74 per unit to cover zone expenses.
Zone 11 – N Citrus Condos
Description: Annexed into the Covina Landscaping District No. 1 in FY 2021-22. Tract No. 73660 generally located west of N. Citrus Avenue and north of W. Orange Street will develop into eight condominiums. Improvements within this area consist of two street trees. The annual assessments provide for the maintenance of the street trees specifically associated with this development.
Assessment Methodology: Based on dwelling units and adjusted annually by the change in the Consumer Price Index up to a maximum of 3%; recommend the assessment of $36.11 per dwelling unit to cover zone expenses.
Zone 12 – N Citrus Commercial Buildings
Description: Annexed into the Covina Landscaping District No. 1 in FY 2021-22. Tract 1224, Lot 6 (401 N. Citrus Avenue) generally located west of N. Citrus Avenue and north of W. Orange Street will develop into two commercial buildings. Improvements within this area consist of six street trees. The annual assessments provide for the maintenance of the street trees specifically associated with this development.
Assessment Methodology: Based on commercial lot size and adjusted annually by the change in the Consumer Price Index up to a maximum of 3%; recommend the assessment of $93.27 per 1,000 square feet of lot size to cover zone expenses.
Zone 13 – Covina Bowl
Description: Annexed into the Covina Landscaping District No. 1 in FY 2022-23. The Zone will develop into one restaurant and 132 condominiums, located south of W. San Bernardino Road, north of W. Badillo Street and west of N. Rimsdale Avenue. Improvements within this area consist of 25 street trees and 7,757 square feet of irrigated landscaping. The annual assessments will provide for the maintenance of the street trees and parkway landscaping specifically associated with this development.
Assessment Methodology: Based on dwelling units or commercial lot size and adjusted annually by the change in the Consumer Price Index up to a maximum of 3%; recommend the assessment of $56.38 per unit to cover zone expenses.
Zone 14 – Zest
Description: Annexed into the Covina Landscaping District No. 1 in FY 2022-23. The Zone will develop into 151 townhomes, located south of Kelby Park and west of Barranca Avenue. Improvements within this area consist of four street trees and 662 square feet of irrigated landscaping. The annual assessments will provide for the maintenance of the street trees and parkway landscaping specifically associated with this development.
Assessment Methodology: Based on dwelling units and adjusted annually by the change in the Consumer Price Index up to a maximum of 3%; recommend the assessment of $13.34 per unit to cover zone expenses. Zone 15 – Campsite Brewery
Description: Annexed into the Covina Landscaping District No. 1 in FY 2023-24. The Zone was developed into one business comprised of two buildings, located north of Front Street and west of Curtis Avenue. Improvements within this area consist of 12 street trees and 2,307 square feet of irrigated landscaping. The annual assessments will provide for the maintenance of the street trees and parkway landscaping specifically associated with this development.
Assessment Methodology: Based on commercial lot size and adjusted annually by the change in the Consumer Price Index up to a maximum of 3%; recommend the assessment of $89.63 per 1,000 square feet of lot size to cover zone expenses.
Zone 16 – Two Residences on Puente Street
Description: Annexed into the Covina Landscaping District No. 1 in FY 2023-24. The Zone will remain as two residential parcels, located north of Puente Street and west of Monte Vista Avenue. Improvements within this area consist of three street trees. The annual assessments will provide for the maintenance of the street trees specifically associated with this development.
Assessment Methodology: Based on dwelling units and adjusted annually by the change in the Consumer Price Index up to a maximum of 3%; recommend the assessment of $136.62 per unit to cover zone expenses.
Zone 17 – Covina 38
Description: Annexed into the Covina Landscaping District No. 1 in FY 2023-24. The Zone will develop into 38 residential townhomes, located north of Covina Blvd., west of Fairvale Avenue, and east of Citrus Avenue. Improvements within this area consist of 18 street trees and 3,275 square feet of irrigated landscaping. The annual assessments will provide for the maintenance of the street trees and parkway landscaping specifically associated with this development.
Assessment Methodology: Based on dwelling units and adjusted annually by the change in the Consumer Price Index up to a maximum of 3%; recommend the assessment of $94.39 per unit to cover zone expenses.
Zone 18 – W Puente Townhomes
Description: Annexed into the Covina Landscaping District No. 1 in FY 2023-24. The Zone will develop into 10 residential townhomes, located north of W. Puente Street, east of S. 4th Avenue, and west of S. 3rd Avenue. Improvements within this area consist of 14 street trees and 2,750 square feet of irrigated landscaping. The annual assessments will provide for the maintenance of the street trees and parkway landscaping specifically associated with this development.
Assessment Methodology: Based on dwelling units and adjusted annually by the change in the Consumer Price Index up to a maximum of 3%; recommend the assessment of $283.01 per unit to cover zone expenses.
The budget summary for each zone is compiled below. Of note, the Department of Public Works has removed certain personnel expenses from the District, and as a result, a Reserve Fund subsidy is no longer required to fund revenue shortages that previously existed in select Zones. Beginning with FY 2023-2024, each Zone’s revenue exceeds its expenditures, and therefore each Zone contributes to the Reserve Fund. For FY 2024-2025, $129,710 is retained in the Reserve Fund.
Budget Summary, FY 2024-2025
Assessment Revenue Expenditures Required Subsidy Reserve Fund Zone 1 $74,120 $28,022 $0 $46,098
Zone 2 $24,837 $13,121 $0 $11,716
Zone 4 $ 5,300 $ 988 $0 $ 4,312
Zone 5 $69,858 $29,304 $0 $40,554
Zone 6 $ 8,550 $ 4,227 $0 $ 4,323
Zone 7 $11,876 $ 4,749 $0 $ 7,127
Zone 8 $ 182 $ 26 $0 $ 155
Zone 10 $ 2,947 $ 427 $0 $ 2,520
Zone 11 $ 289 $ 42 $0 $ 247
Zone 12 $ 516 $ 75 $0 $ 441
Zone 13 $ 8,010 $ 2,761 $0 $ 5,249
Zone 14 $ 2,014 $ 761 $0 $ 1,253
Zone 15 $ 2,626 $ 993 $0 $ 1,633
Zone 16 $ 273 $ 103 $0 $ 170
Zone 17 $ 3,587 $ 1,434 $0 $ 2,152
Zone 18 $ 2,831 $ 1,071 $0 $ 1,760 .
Totals $217,816 $88,104 $0 $129,710
FISCAL IMPACT:
Legally required engineering, advertising, and balloting costs for the Covina Landscaping District No. 1 are included in the FY 2024-2025 Street Trees and Landscaping Assessment District budget (Fund 2720). The proposed action has no impact on the General Fund.
CEQA (CALIFORNIA ENVIRONMENTAL QUALITY ACT):
Not applicable.
Respectfully submitted,
City of Covina
Landscaping Maintenance District No. 1
2024/2025 ENGINEER’S REPORT
Intent Meeting: June 18, 2024
Public Hearing: July 16, 2024
27368 Via Industria
Suite 200
Temecula, CA 92590
T 951.587.3500|800.755.6864
F 951.587.3510|888.326.6864
Property Tax Information Line
T. 866.807.6864
www.willdan.com
ENGINEER'S REPORT AFFIDAVIT
Establishment of Annual Assessments for the:
Covina Landscaping Maintenance District No. 1
City of Covina
Los Angeles County, State of California
This Report identifies the parcels within the District and all relevant zones therein, as they existed at the time of the passage of the Resolution of Intention. Reference is hereby made to the Los Angeles County Assessor’s maps for a detailed description of the lines and dimensions of parcels within the District. The undersigned respectfully submits the enclosed Report as directed by the City Council.
Dated this ____________ day of ______________, 2024.
Willdan Financial Services
Assessment Engineer
On Behalf of the City of Covina
By: ________________________________
Susana Hernandez, Senior Project Manager
District Administration Services
By: ________________________________
Tyrone Peter
PE # C 81888
16 July
TABLE OF CONTENTS
I. OVERVIEW .............................................................................................................. 1 A. INTRODUCTION .............................................................................................. 1 B. DISTRICT BACKGROUND .............................................................................. 2 C. CHANGES TO THE DISTRICT ......................................................................... 3 II. DESCRIPTION OF THE DISTRICT AND SERVICES ............................................. 5 A. DISTRICT ZONES ............................................................................................ 5 B. IMPROVEMENTS AUTHORIZED BY THE 1972 ACT ...................................... 9 C. DISTRICT IMPROVEMENTS AND SERVICES .............................................. 10 III. METHOD OF APPORTIONMENT ......................................................................... 11 IV. DISTRICT BUDGETS ............................................................................................ 13 A. ZONE 1 BUDGET, FISCAL YEAR 2024/2025 ................................................ 13 B. ZONE 2 BUDGET, FISCAL YEAR 2024/2025 ................................................ 14 C. ZONE 4 BUDGET, FISCAL YEAR 2024/2025 ................................................ 15 D. ZONE 5 BUDGET, FISCAL YEAR 2024/2025 ................................................ 16 E. ZONE 6 BUDGET, FISCAL YEAR 2024/2025 ................................................. 17 F. ZONE 7 BUDGET, FISCAL YEAR 2024/2025 ................................................. 18 G. ZONE 8 BUDGET, FISCAL YEAR 2024/2025 ................................................ 19 H. ZONE 9 BUDGET, FISCAL YEAR 2024/2025 ................................................ 20 I. ZONE 10 BUDGET, FISCAL YEAR 2024/2025 .............................................. 21 J. ZONE 11 BUDGET, FISCAL YEAR 2024/2025 .............................................. 22 K. ZONE 12 BUDGET, FISCAL YEAR 2024/2025 .............................................. 23 L. ZONE 13 BUDGET, FISCAL YEAR 2024/2025............................................... 24 M. ZONE 14 BUDGET, FISCAL YEAR 2024/2025 .............................................. 25 N. ZONE 15 BUDGET, FISCAL YEAR 2024/2025 .............................................. 26 O. ZONE 16 BUDGET, FISCAL YEAR 2024/2025 .............................................. 27 P. ZONE 17 BUDGET, FISCAL YEAR 2024/2025............................................... 28 Q. ZONE 18 BUDGET, FISCAL YEAR 2024/2025 .............................................. 29 V. DISTRICT DIAGRAM ............................................................................................ 30 VI. ASSESSMENT ROLL ............................................................................................ 31
2024/2025 Landscaping Maintenance District No. 1 Page 1 of 47 I. OVERVIEW
A. INTRODUCTION
The Covina Landscaping Maintenance District No. 1 (hereafter referred to as the “District”) was formed April 6, 1981 pursuant to the provisions of the California Streets and Highways Code, Division 15, Part 2, Landscaping and Lighting Act of 1972 (hereafter referred to as the “1972 Act”), in order to provide and maintain public landscape improvements in specified areas within the City of Covina. Since formation of the District, the City of Covina (hereafter referred to as the “City”) has annually levied and collected special assessments upon properties within the District for the annual maintenance and operation of the improvements that benefit those properties pursuant to the 1972 Act. The parcels included in the original District formation and all subsequent annexations thereto, are included within a specified benefit zone (hereafter referred to as the “Zone”) based on the specific development of those properties and the improvements and services from which they receive benefit.
This Engineer’s Report (hereafter referred to as the “Report”) describes the District, any proposed changes to the District and the assessments for Fiscal Year 2024/2025. The proposed assessments are based on the City’s estimated cost to maintain the improvements that provide special benefit to properties within the District. The various improvements within the District and the costs of those improvements are identified and budgeted separately for each Zone, including all expenditures, deficits, surpluses, revenues, and reserves. Each parcel within a Zone is assessed proportionately for only those improvements provided in that Zone from which the parcel receives special benefit.
The word “parcel,” for the purposes of this Report, refers to an individual property assigned its own Assessment Number by the Los Angeles County Assessor’s Office. The Los Angeles County Auditor/Controller uses Assessment Numbers and specific Fund Numbers, to identify on the tax roll, properties assessed for special District benefit assessments.
Upon conclusion of a noticed Public Hearing, the City Council will consider all testimony and written protests presented and will direct any necessary modifications to the Report and approve the Report as submitted or amended.
Following final approval of the Report, the City Council will, by resolution, order the improvements to be made, and confirm the levy and collection of assessments pursuant to the 1972 Act. The assessment rates and method of apportionment described in this Report as approved by the City Council defines the assessments to be applied to each parcel within the District for Fiscal Year 2024/2025. The assessments as approved will be submitted to the Los Angeles County Auditor/Controller to be included on the property tax roll for each parcel.
If any parcel submitted for collection is identified by the County Auditor/Controller to be an invalid parcel number for the current Fiscal Year, a corrected parcel
2024/2025 Landscaping Maintenance District No. 1 Page 2 of 47 number and/or new parcel numbers will be identified and resubmitted to the County Auditor/Controller. The assessment amount to be levied and collected for the resubmitted parcel or parcels shall be based on the method of apportionment and assessment rate described in this report and approved by the City Council.
B. DISTRICT BACKGROUND
The Covina Landscaping Maintenance District No. 1 was originally formed in 1981 with Zones 1 and 2 (only Zone 1 was assessed the first year). In Fiscal Year 1982/1983, Zone 2 was assessed for the first time.
In Fiscal Year 1983/1984, Zone 3 was established within the District. Properties within Zone 3 were levied an assessment that first Fiscal Year, but have not been levied an assessment since, because the association of the property owners along Golden Grove Way took over and currently provide for the maintenance of the landscape improvements originally associated with this Zone. These properties, the improvements and the Zone are no longer included as part of the District.
In 1985, the City began the process of annexing additional properties into the District that were being developed to ensure the General Fund would not be impacted by the expense of maintaining street landscaping within the City. Initially, annexation of properties to the District was done by petition (property owner consent and waiver), pursuant to Section 22608 of the 1972 Act. Through this process, the property owners signed a letter consenting to the annexation, which eliminated the lengthy process of resolutions, reports, publications, hearings, etc., otherwise required for the annexation of territory to the District. The properties annexed to the District were designated as either Zone 4 (single-family residences and condominium units) or Zone 5 (commercial/industrial developments).
In Fiscal Year 1986/1987, Zones 4 and 5 were added to the District. The City annexed six properties on the south side of San Bernardino Road, west of Hollenbeck Avenue, in conjunction with the street widening that included street tree planting.
In 1988, the District was expanded again by annexing the properties east and west of Azusa Avenue from Arrow Highway to 600 feet south of Badillo Street in connection with the Azusa Avenue beautification project. Subsequent properties have been annexed to Zones 4 and 5 via the petition of the property owners while others have been included via the public hearing process. This process of annexation to the District continued up through Fiscal Year 1996/1997 when Proposition 218 was approved.
In Fiscal Year 2008/2009, the City initiated and conducted a property owner protest ballot proceeding for a proposed assessment increase for each zone. The proposed assessment increase was not approved by property owners; therefore, the maximum assessment rates remained the same as previously approved.
2024/2025 Landscaping Maintenance District No. 1 Page 3 of 47 C. CHANGES TO THE DISTRICT
Pursuant to the provisions of the California Constitution, Article XIIID Section 4, and in accordance with the provisions of Government Code, Section 53753, the City has conducted property owner protest ballot proceedings (“Ballot Proceedings”) for the levy of all new Zones. In conjunction with these Ballot Proceedings, the City Council conducted noticed public hearings to consider public testimonies, comments and written protests regarding the annexations, Zone boundaries and Sub-Zones, and the new assessments described herein. Upon conclusion of the public hearings, property owner protest ballots were received, opened and tabulated to determine whether majority protest exists as defined in Article XIIID of the California Constitution.
In 1985, the City started annexation proceedings into the landscaping District for properties not already within Zones 1, 2 and 3. As previously indicated, initially the annexation of properties to the District was done by petition (property owner consent and waiver), pursuant to Section 22608 of the 1972 Act as part of various street widening and street tree planting projects and the Azusa Avenue beautification project. Over the course of several years, however, the annexation of properties to both Zone 4 and Zone 5 included several new developments and individual residents that had filed for a building permit. This annexation process eventually created various inconsistencies in the benefit that properties received from the landscape improvements provided by the District. In response to this issue, in 2002 the City’s assessment engineer evaluated the properties within the District and removed from both Zone 4 and Zone 5 those properties that do not receive special benefit from the improvements maintained and budgeted for the District. Although these properties have not been technically detached from the District, they are no longer included in either Zone 4 or Zone 5 and are not subject to the annual assessments for these Zones.
In Fiscal Year 2017/2018 pursuant to the provisions of the 1972 Act and in compliance with the substantive and procedural requirements of Article XIIID of the California State Constitution (the “California Constitution”), the City Council of the City of Covina annexed into the District all lots and parcels of land within the planned development identified as Tract No. 73455 (Dalton Place) and established it as new Zone 6 to expand the improvements to be provided and maintained within the District. Tract No. 73455 (Dalton Place) developed into sixty-three (63) singlefamily residential units.
In Fiscal Year 2018/2019 pursuant to the provisions of the 1972 Act and in compliance with the substantive and procedural requirements of Article XIIID of the California State Constitution, the City Council of the City of Covina, annexed into the District all lots and parcels of land within the planned developments identified as Tract No. 74512-1, Parcel Map No. 72690 and Parcel Map No. 73595.
Tract No. 74512-1 has been developed with a total of one-hundred seventeen (117) residential units (townhomes) and is identified as Zone 7, Parcel Map No.72690 was developed with three (3) residential units (townhomes) and is
2024/2025 Landscaping Maintenance District No. 1 Page 4 of 47 identified as Zone 8 and Parcel Map 73595 is planned for a 4-lot subdivision and is identified as Zone 9.
In Fiscal Year 2019/2020 pursuant to the provisions of the 1972 Act and in compliance with the substantive and procedural requirements of Article XIIID of the California State Constitution, the City Council of the City of Covina, annexed into the District all lots and parcels of land within the planned developments identified as Tract No. 72116. Tract No. 72116 has been developed with sixty-eight (68) townhomes, four (4) live/work lofts and one parcel consisting of three (3) office/retail units and is identified as Zone 10.
In Fiscal Year 2021/2022 pursuant to the provisions of the California Constitution and the 1972 Act, the City Council of the City of Covina, annexed into the District all lots and parcels of land within the planned developments identified as Tract No. 73660 and 401 N. Citrus (Tract 1224, Lot 6). Tract No. 73660 has been developed with eight (8) condominiums (residential units) and is identified as Zone 11 and 401 N. Citrus (Tract 1224, Lot 6) is designated as Zone 12 and has been developed out to two (2) commercial buildings.
In Fiscal Year 2022/2023 pursuant to the provisions of the California Constitution and the 1972 Act, the City Council of the City of Covina annexed into the District all lots and parcels of land within the planned developments identified as Tract No. 82874 (Covina Bowl) and Tract No. 83178 (Zest). Tract No 82874 (Covina Bowl) was defined to be a mixed-use property with commercial and residential units (1 restaurant and 132 condominiums) designated as Zone 13, and Tract No. 83178 (Zest) was designated as Zone 14 planned for 151 residential units (44 flex townhomes and 107 townhome/flats).
In Fiscal Year 2023/2024 pursuant to the provisions of the California Constitution and the 1972 Act, the City Council of the City of Covina annexed into the District all lots and parcels of land within the planned developments identified as Tract No. 45569 (Campsite Brewery), Parcel Map No. 82493, Tract No. 83343, and Tract No. 83203. Tract 45569 (Campsite Brewery) is a commercial development with two (2) buildings on one (1) parcel and was designated as Zone 15; Parcel Map No. 82493 with two (2) residential units was designated as Zone 16; Tract No. 83343 planned for thirty-eight (38) residential townhomes was designated as Zone 17; and Tract No. 83203 designated as Zone 18 will develop out to ten (10) residential townhomes.
2024/2025 Landscaping Maintenance District No. 1 Page 5 of 47 The following table lists the Zones currently in and scheduled to be annexed into the Landscape Maintenance District No. 1.
Zone Tract No./Parcel Map No. Fiscal Year
1, 2, 3 (1) 1985
4, 5 2002
6 73455 (Dalton Place) 2017/2018
7, 8, 9 74512-1, 72690, 73595 2018/2019
10 72116 (Atwood) 2019/2020
11 73660 2021/2022
12 1224 (Lot 6) 2021/2022
13 82874 (Covina Bowl) 2022/2023
14 83178 (Zest) 2022/2023
15 45569 (Campsite Brewery) 2023/2024
16 82493 2023/2024
17 83343 2023/2024
18 83203 2023/2024
19 (2) 84311 2024/2025
20 (2) 82315 2024/2025
(1) Zone 3 is no longer part of the District. The maintenance of Zone 3 landscape improvements were taken over by the property owners along Golden Grove Way.
(2) Annexation area is currently in process and described in a separate Engineer’s Report. .
As specified by the California Constitution, Article XIIID Section 4e:
“A majority protest exists if, upon the conclusion of the hearing, ballots submitted in opposition to the assessment exceed the ballots submitted in favor of the assessment. In tabulating the ballots, the ballots shall be weighted according to the proportional financial obligation of the affected property.” II. DESCRIPTION OF THE DISTRICT AND SERVICES
A. DISTRICT ZONES
The City annually levies and collects assessments in order to maintain and service specific improvements within the District based on the City’s estimate of the costs associated with those improvements. The District is currently comprised of eighteen (18) benefit Zones, of which seventeen (17) are active, which include specific properties and the improvements that benefit those properties. Zone 3 is no longer part of the District. The maintenance of Zone 3 landscape improvements were taken over by the property owners along Golden Grove Way.
The District Zones are identified as: