Cities Index.
Agenda packet

Covina City Council
May 6, 2025

Document
Agenda packet
Meeting
May 6, 2025
Body
Covina City Council
Pages
445
Original file
29.8 MB
Text extracted from the city's file for reading and search. Open the original on pub-covinaca.escribemeetings.com. That file is the official record.

ENVIRONMENTAL FEES
# Title
Current
Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Unit Notes Fee Δ 19 NPDES Permit Inspection - Commercial/Industrial Storm Water Inspection(Per Year, Charged with New Business License Application and with Annual Renewal) $63.00
Actual Costs - 2 - JLHA ($125) inspections x Admin Cost (25%)/5 (inspection every 2 years - split annually) $62.50 $135.00 50% $68.00 per inspection
JLHA cost is $135/inspection. An inspection is performed every 2 years. This fee is charged to businesses that get SW inspections only, and no IW inspections.$135/2 = $68 per year. $5
20 Plan Review (Per Review) Staff Time $133.00 per hour Staff = 3/4 ESA($101.39) + 1/4 SAT ($31.28) = $132.67 $168.66 0% $168.00 per review City staff time to review development plans. Staff = PWM, 0.5 hrs @ $327/hr = $164 $3521 Pool Drainage Permit $0.00 per inspection No Fee NA NA $0.00 per permit No fee for issuance of a pool drainage permit. $0 22 Post Installation BMP Inspections (2 Inspections Required per Project) $160.00 per inspection Actual Costs - JLHA ($128/hr) X Admin Cost (25%) = $160.00 $1,219.71 2% $1,200.00 per project JLHA performs 2 inspections, one before backfill and one at project completion, 3 hrs per inspection. $1,04023 Recycling Permit Fee (Per Year) $30.00 per year Amount charged to recyclers (fee for service); Added to business licence (e-waste & women's club recycling) $30.00 0% $30.00 per year
Amount charged to recyclers (fee for service). Added to business license (e-waste recyclers, CRV recyclers, etc.) $0
24 Resident Does Not Attend Workshop. Wants to Purchase Compost Bin and Other Item Sale $40.00 $32 subsidized by AB 939 fee (source reduction) $72.00 44% $40.00 per bin $40 paid by resident.$32 is subsidized by IWM fee (to encourage source reduction).$72 is the total cost per compost bin. $0
25 Water Quality Sampling of Illicit Discharge (Per Sampling Event) Actual Costs + 25% Admin Fee Actual cost for lab analysis + Admin Cost (25%) NA NA Actual Costs Based on FBR + Materials per incident Actual costs based on: sampling, lab analysis, and City staff time. $0 Attachment
A

Page 367 of 445 ends

INDUSTRIAL WASTE FEES
# Title
Current
Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Unit Notes Fee Δ 1 Site-Remediation Investigation (Staff Time) $79.00 per hour $246.71 1% $245.00 per hour $166 2 Industrial Waste Annual Inspection Fee - Class A (Per Year, Charged with New Business License Application and with Annual Renewal) $226.00 per inspection $148.00 0% $148.00
For Class A, JLHA performs inspections for Storm Water (every 2 yrs) and for IW/FOG (1x/ yr).Year 1 = Combo, SW + IW/FOG inspection = $160. Year 2 = IW/FOG inspection only = $135.$295 every two years, $148 per year. -$78
3 Industrial Waste Annual Inspection Fee - Class B (Per Year, Charged with New Business License Application and with Annual Renewal) $451.00 per inspection $283.00 0% $283.00
For Class B, JLHA performs inspections for Storm Water (every 2 yrs) and for IW/FOG (2x/yr).Year 1 = Combo, SW + IW/FOG inspection ($160), IW/FOG inspection ($135) = $295. Year 2 = Two IW/FOG inspections ($135 ea) = $270.$565 every two years, $283 per year. -$168
4 Industrial Waste Annual Inspection Fee - Class C (Per Year, Charged with New Business License Application and with Annual Renewal) $676.00 per inspection $418.00 0% $418.00
For Class C, JLHA performs inspections for Storm Water (every 2 yrs) and for IW/FOG (3x/yr).Year 1 = Combo, SW + IW/FOG inspection ($160), IW/FOG inspection ($135), IW/FOG inspection ($135) = $430. Year 2 = Three IW/FOG inspections ($135 ea) = $405.$835 every two years, $418 per year. -$258
5 Industrial Waste Annual Inspection Fee - Class D (Per Year, Charged with New Business License Application and with Annual Renewal) $901.00 per inspection $553.00 0% $553.00
For Class D, JLHA performs inspections for Storm Water (every 2 yrs) and for IW/FOG (4x/yr).Year 1 = Combo, SW + IW/FOG inspection ($160), IW/FOG inspection ($135), IW/FOG inspection ($135), IW/FOG inspection ($135) = $565. Year 2 = Four IW/FOG inspections ($135 ea) = $540.$1,105 every two years, $553 per year. -$348
6 Review of Site-Remedial Investigation and Clean- Up Plan (Per Hour) $313.00 $337.32 0% $337.00 per hour $24 7 Wastewater Sampling and Analysis (Per Sampling Event) $226.00 NA NA Actual costs based
on: sampling, lab analysis, and city staff time.
per incident NA
Attachment
A

Page 368 of 445 ends

PARKS & RECREATION FEES
# Title
Current
Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Unit Fee Δ 1 Lap Swim $5.00 per person per entry NA NA $5.00 per person per entry $0 2 Leaders-in-Training $55.00 per program period NA NA $55.00 $03 Youth Sports Program $57.00 1 day per week/6 weeks NA NA $8.00-$12.00* per person per day Variable4 Parade Entry - Band $105.00 NA NA $110.00 $5 5 Parade Entry - Commercial $150.00 NA NA $160.00 $106 Parade Entry - General $55.00 NA NA $60.00 $5 7 Group Swim Lessons $58.00 5 Days, 40 Minutes Per Day NA NA $12.00-$17.00* per person per day Variable8 Semi-Private Swim Lessons $125.00 5 Days, 40 Minutes Per Day NA NA $20.00-$30.00* per person per day Variable 9 Private Swim Lessons $90.00 5 Days, 40 Minutes Per Day NA NA $30.00-$35.00* per person per day Variable 10 Swim Team $192.00 10 Weeks, 4 Days Per Week, Including Meets NA NA $6.00-$10.00* per person per day Variable 11 Senior Special Events $20.00 NA NA $10.00-$30.00* per person Variable12 Senior Monthly Dance $5.00 NA NA $5.00-$10.00* per person Variable13 Senior Fitness Center Orientation $10.00 NA NA $10.00 per person $0 14 Day Trips $40.00 average per person per trip NA NA $10.00-$200.00* per person per trip Variable15 Classes $50.00 average per person per class NA NA $10.00-$300.00* per person per session Variable 16 Summer and Spring Day Camp $170.00 per person per week NA NA $35.00-$45.00* per person per day Variable17 Athletic Fields Security Deposit $200.00 NA NA $200.00 $0 18 Covina Park Softball Field for Covina-Based Nonprofit Organization, Covina Business or Covina Resident 7am-5pm / 5pm-10pm methodology change19 Up to 50 people $60/$75 2-Hour Period NA NA $50.00 per hour Variable 20 Over 50 people $60/$75 2-Hour Period NA NA $75.00 per hour Variable 21 Covina Park Softball Field for Non-Covina-Based Nonprofit, Non-Covina Business or Nonresident 7am-5pm / 5pm-10pm methodology change22 Up to 50 people $80/$105 2-Hour Period NA NA $75.00 per hour Variable 23 Over 50 people $80/$105 2-Hour Period NA NA $100.00 per hour Variable 24 Hollenbeck Park Sports Field for Covina Based Nonprofit Organization, Covina Business or Covina Resident 7am-5pm / 5pm-10pm methodology change25 Up to 50 people $60/$75 2-Hour Period NA NA $50.00 per hour Variable 26 Over 50 people $60/$75 2-Hour Period NA NA $75.00 per hour Variable27 Hollenbeck Parks Sports Field for Non-Covina Based Nonprofit, Non- Covina Business or Nonresident 7am-5pm / 5pm-10pm methodology change28 Up to 50 people $80/$105 2-Hour Period NA NA $75.00 per hour Variable 29 Over 50 people $80/$105 2-Hour Period NA NA $100.00 per hour Variable 30 Sunkist Park Grass Area for Covina Based Nonprofit Organization, Covina Business or Covina Resident 8am - Dusk methodology change31 Up to 50 people $50.00 2-Hour Period NA NA $50.00 per hour Variable 32 Over 50 people $50.00 2-Hour Period NA NA $75.00 per hour Variable33 Sunkist Park Grass Area for Non-Covina Based Nonprofit, Non-Covina Business or Nonresident 8am - Dusk methodology change34 Up to 50 people $65.00 2-Hour Period NA NA $75.00 per hour Variable35 Over 50 people $65.00 2-Hour Period NA NA $100.00 per hour Variable 36 Wingate Park Grass Area for Covina Based Nonprofit Organization, Covina Business or Covina Resident 8am - Dusk methodology change37 Up to 50 people $50.00 2-Hour Period NA NA $50.00 per hour Variable 38 Over 50 people $50.00 2-Hour Period NA NA $75.00 per hour Variable39 Wingate Park Grass Area for Non-Covina Based Nonprofit, Non-Covina Business or Nonresident 8am - Dusk methodology change40 Up to 50 people $50.00 2-Hour Period NA NA $50.00 per hour Variable41 Over 50 people $50.00 2-Hour Period NA NA $75.00 per hour Variable42 Covina Park Softball Field Light Use $25.00 per hour NA NA $30.00 per hour $543 Hollenbeck Park Light Use $33.00 per hour NA NA $35.00 per hour $2 44 Roller Hockey/Skating Rinks (2-hour period) $75.00 per 2-hour period NA NA $50.00 per hour Variable 45 Security Deposit (Recreation Hall, Teen Center, Cougar Park Community Center) $300.00 NA NA $300.00 $046 Sanitation and Setup/Clean up Fee (Recreation Hall, Teen Center, Cougar Park Community Center) $100.00 $102.85 3% $100.00 $0 Attachment
A

Page 369 of 445 ends

PARKS & RECREATION FEES
# Title
Current
Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Unit Fee Δ 47 Recreation Hall Use for Covina-Based Nonprofit Organization, Covina Business or Covina Resident $150.00 per hour NA NA $150.00 per hour $048 Recreation Hall Use for Non-Covina-Based Nonprofit, Non-Covina Business or Nonresident $175.00 per hour NA NA $175.00 per hour $0 49 Cougar Park Community Center Use for Covina-Based Nonprofit Organization, Covina Business or Covina Resident $150.00 per hour NA NA $150.00 per hour $0 50 Cougar Park Community Center Use for Non-Covina-Based Nonprofit, Non-Covina Business or Nonresident $175.00 per hour NA NA $175.00 per hour $0 51 Teen Center Use $50.00 per hour Assembly: 40 NA NA $60.00 per hour $1052 Security Deposit for Covina Park Bandshell or Heritage Plaza $200.00 NA NA $200.00 $0 53 Covina Park Bandshell Use for Covina-Based Nonprofit Organization, Covina Business or Covina Resident $175.00 2-Hour Period NA NA $125.00 per hour -$50 54 Covina Park Bandshell Use for Non-Covina-Based Nonprofit, Non-Covina Business or Nonresident $200.00 2-Hour Period NA NA $150.00 per hour -$50 55 Heritage Plaza Platform for Covina-Based Nonprofit Organization, Covina Business or Covina Resident $125.00 2-Hour Period NA NA $100.00 per hour -$25 56 Heritage Plaza Platform for Non-Covina-Based Nonprofit, Non-Covina Business or Nonresident $150.00 2-Hour Period NA NA $125.00 per hour -$25 57 Senior and Community Center Security Deposit $400.00 NA NA $400.00 $058 Senior and Community Center Use for Covina-Based Nonprofit Organization, Covina Business or Covina Resident $225.00 per hour NA NA $225.00 per hour $059 Senior and Community Center Use for Non-Covina-Based Nonprofit, Non- Covina Business or Nonresident $300.00 per hour NA NA $300.00 per hour $060 Senior and Community Center Sanitation and Setup/Clean up Fee $140.00 $143.42 2% $140.00 $0 61 Library Community Room Use $30.00 per hour NA NA $60.00 per hour $30 62 Community Garden Annual Use Fees63 Cougar Park Community Garden Large Parcel or Handicap Accessible Parcel $50.00 per parcel annually Annual Period of January 1 - December 31. Fees will be prorated by 50% for applicants approved July 1 - November 1 of an annual period.

NA NA $50.00 per parcel annually $0
64 Cougar Park Community Garden Small Parcel $44.00 per parcel annually Annual Period of January 1 - December 31. Fees will be prorated by 50% for applicants approved July 1 - November 1 of an annual period.

NA NA $44.00 per parcel annually $0
Attachment
A

Page 370 of 445 ends

LIBRARY FEES
# Title Current Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ 1 Computer Printout Per Page $0.15 per page $1.15 78% $0.25 $0.10 2 Computer Printouts Color - Per Page $0.50 per page $1.20 58% $0.50 $0 3 Library Late Charges - Books Per Day (Penalty) $0.25 Also includes audiobooks and magazines NA NA $0.25 $0 4 Library Late Charges - DVDs Per Day (Penalty) $1.00 NA NA $1.00 $0 5 Lost/Damage Book Fees $4.00 plus Actual Material Replacement Cost NA NA Actual Replacement Cost -$4 6 Lost/Damage Cases for DVD $4.00 plus Actual Material Replacement Cost NA NA Actual Replacement Cost -$47 Lost/Damage DVD $4.00 plus Actual Material Replacement Cost NA NA Actual Replacement Cost -$48 Lost/Damage Magazines $4.00 plus Actual Material Replacement Cost NA NA Actual Replacement Cost -$4 Attachment
A

Page 371 of 445 ends

BUILDING FEES
# Title
Current
Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ 1 Standard Hourly Rate (ENV) $133.00 $212.63 0% $212.00 $79 2 Antenna Equipment Container $397.90 $402.08 0% $402.00 $43 Antenna (0-30 Ft) $397.90 $459.98 0% $459.00 $61 4 Antenna (31+ Ft) $489.90 $566.33 0% $566.00 $765 Cellular/Mobile Phone, Co-Location $336.95 $389.52 0% $389.00 $52 6 Cellular/Mobile Phone, Free-Standing $336.95 $389.52 0% $389.00 $527 Address Verification Actual Cost NA NA Actual Cost $0 8 Archive Fee 2% of Permit Value 3.3% 8% 3% of Permit Value 1.0% 9 Scanning Fee New per sheet NA NA Actual Cost NA
10 Plan Maintenance Fee New $48.09 0% $48.00 NA11 Appeal of Abatement Notice $266.00 $307.50 0% $307.00 $4112 Awning or Canopy $230.00 $265.88 0% $265.00 $3513 Balcony Addition $230.00 $265.88 0% $265.00 $3514 Carport $198.95 $229.99 0% $229.00 $3015 Carport (with Calcs) $276.00 $319.06 0% $319.00 $4316 Change of Occupancy $290.95 $336.34 0% $336.00 $4517 Close Existing Openings:18 Exterior Wall $230.00 $265.88 0% $265.00 $3519 Interior Wall $230.00 $265.88 0% $265.00 $3520 Commercial Coach $280.00 per unit $323.68 0% $323.00 $4321 Code Compliance Inspections/Reinspection $290.95 $336.34 0% $336.00 $4522 Covered Porch $230.00 $265.88 0% $265.00 $35 23 Deck (Wood) $184.00 $212.71 0% $212.00 $28
24 Deck (Wood) (with Calcs) $230.00 $265.88 0% $265.00 $3525 Demolition $290.95 $336.34 0% $336.00 $45 26 Door:27 New Door (Non Structural) $213.90 $247.27 0% $247.00 $3328 New Door (Structural Shear Wall/Masonry) $290.95 $336.34 0% $336.00 $45 29 Fence of Freestanding Wall (Non-Masonry)30 Up to 10 feet in height (first 100 LF) $186.00 $215.02 0% $215.00 $29 31 Each Additional 100 LF $67.00 $77.45 1% $77.00 $10
32 Over 10 Feet in Height (First 100 LF) $226.00 $261.26 0% $261.00 $35 33 Over 10 Feet in Height (First 100 LF with Calcs) $280.00 $323.68 0% $323.00 $4334 Each Additional 100 LF $133.00 $153.75 0% $153.00 $20 35 Fence of Freestanding Wall (Masonry)36 Over 3 Feet Up to 6 Feet High (First 100 LF) $186.00 $215.02 0% $215.00 $2937 Each Additional 100 LF $67.00 $77.45 1% $77.00 $10 38 Special Design (6-10' High) $253.00 $292.47 0% $292.00 $3939 Each Additional 100 LF $107.00 $123.69 1% $123.00 $16 40 Special Design (Over 10' High) $320.00 $369.93 0% $369.00 $49 Attachment
A

Page 372 of 445 ends

BUILDING FEES
# Title
Current
Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ 41 Each Additional 100 LF $133.00 $153.75 0% $153.00 $20 42 Fireplace: Masonry $213.90 $247.27 0% $247.00 $33
43 Fireplace: Masonry (with Calcs) $290.95 $336.34 0% $336.00 $45 44 Fireplace: Pre-Fabricated/Metal $322.00 $372.24 0% $372.00 $5045 Flag Pole (Over 30 Feet in Height) $184.00 $212.71 0% $212.00 $2846 Garage (detached)47 Wood frame Up to 1,000 SF $368.00 $425.41 0% $425.00 $5748 Each Wood Frame <1,000 SF $73.60 per 100 SF $85.08 0% $85.00 $1149 Masonry up to 1,000 SF $520.95 $602.23 0% $602.00 $81 50 Each Masonry <1,000 SF $104.19 per 100 SF $120.45 0% $120.00 $1651 Greenhouse (Non-Commercial) $184.00 $212.71 0% $212.00 $2852 Greenhouse (Non-Commercial) (with Calcs) $244.95 $283.17 0% $283.00 $38 53 Lighting Pole $198.95 $229.99 0% $229.00 $3054 Each Additional Pole $53.00 $61.27 0% $61.00 $855 Mobile Home $322.00 $372.24 0% $372.00 $50 56 Mobile Home, Double Wide $443.90 $513.16 0% $513.00 $69 57 Partition - Commercial, Interior (Up to 30 LF) $259.90 $300.45 0% $300.00 $40 58 Additional Partition (Each 30 LF) $123.05 $142.25 0% $142.00 $1959 Partition - Residential, Interior (Up to 30 LF) $213.90 $247.27 0% $247.00 $33 60 Additional Partition (Each 30 LF) $67.00 $27.90 (for 31 lf - 60 lf), $77.00 (for 60 lf & over) $77.45 1% $77.00 $10 61 Patio Cover62 Wood Frame (Up to 300 SF) $213.90 $247.27 0% $247.00 $3363 Wood Frame (Up to 300 SF with Calcs) $290.95 $336.34 0% $336.00 $4564 Metal Frame (Up to 300 SF) $184.00 $212.71 0% $212.00 $2865 Other frame (Up to 300 SF) $213.90 $247.27 0% $247.00 $3366 Additional Patio (Up to 300 SF) $92.00 $106.35 0% $106.00 $1467 Enclosed (Up to 300 SF) $184.00 $212.71 0% $212.00 $28 68 Enclosed, Wood Frame (Up to 300 SF with Calcs) $230.00 $265.88 0% $265.00 $3569 Enclosed, Metal Frame (Up to 300 SF) $213.90 $247.27 0% $247.00 $33 70 Enclosed, Metal Frame (Up to 300 SF with Calcs) $244.95 $283.17 0% $283.00 $3871 Enclosed, Other Frame (Up to 300 SF) $276.00 $319.06 0% $319.00 $4372 Additional Enclosed Patio (Each 300 SF) $106.95 $123.64 1% $123.00 $16 73 Photovoltaic System-(stand alone) $305.90 Per KWh $353.63 0% $353.00 $4774 Pile Foundation:75 Cast in Place Concrete (First 10 Piles) $184.00 $212.71 0% $212.00 $2876 Additional Piles (Increments of 10) $92.00 $106.35 0% $106.00 $14 77 Driven (Steel, Pre-Stressed Concrete Up to 10) $213.90 $247.27 0% $247.00 $33 78 Additional Piles (Increments of 10) $92.00 $106.35 0% $106.00 $1479 Pre-Plan Inspection (First Hour) $152.95 $176.81 0% $176.00 $23 80 Pre-Plan Inspection (Each Additional Hour) $152.95 $176.81 0% $176.00 $2381 Additional Stucco Application (Each 400 SF) $31.05 $35.89 2% $35.00 $4 Attachment
A

Page 373 of 445 ends

BUILDING FEES
# Title
Current
Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ 82 Stucco Applications (Up to 400 SF) $184.00 $212.71 0% $212.00 $2883 Relocated Building (Within 25 Miles of City Offices) $351.90 $406.80 0% $406.00 $5484 Each Additional 10 Miles (or Portion Thereof) $140.76 $162.72 0% $162.00 $2185 Retaining Wall (Concrete or Masonry):86 First 50 LF $213.90 $247.27 0% $247.00 $33 87 Additional Retaining Wall (Each 50 LF) $14.95 $17.28 2% $17.00 $2 88 Special Design, 3-10' High (Up to 50 LF) $322.00 $372.24 0% $372.00 $50 89 Additional Retaining Wall (Each 50 LF) $31.05 $35.89 2% $35.00 $4 90 Special Design, Over 10' High (Up to 50 LF) $382.95 $442.70 0% $442.00 $5991 Additional Retaining Wall (Each 50 LF) $46.00 $53.18 0% $53.00 $7 92 Gravity/Crib Wall (First 50 LF) $244.95 $283.17 0% $283.00 $3893 Additional Gravity/Crib Wall (Each 50 LF) $31.05 $35.89 2% $35.00 $4 94 Gravity/Crib Wall, Over 10' High (Up to 50 LF) $276.00 $319.06 0% $319.00 $4395 Additional Gravity/Crib Wall (Each 50 LF) $46.00 $53.18 0% $53.00 $7 96 Remodel - Residential:97 500 SF Single Story $276.00 $319.06 0% $319.00 $4398 Kitchen (More than 500 SF) $368.00 $425.41 0% $425.00 $5799 Additional Remodel (Garage Conversions - Each 500 SF) $77.05 not including ADU/habitable $89.07 0% $89.00 $12 100 Re-Roofing:101 Tile/Shake: (First 100 SF) $106.95 $123.64 1% $123.00 $16 102 Each Additional 100 SF $14.95 $17.28 2% $17.00 $2
103 Comp/Metal (First 100 SF) $92.00 $106.35 0% $106.00 $14 104 Each Additional 100 SF $14.95 $17.28 2% $17.00 $2
105 Roof Structure Replacement (Up to 100 SF) $184.00 $212.71 0% $212.00 $28106 Additional Roof Structure Replacement (Each 100 SF) $31.05 $35.89 2% $35.00 $4 107 Room Addition - First Story:108 Up to 500 SF $428.95 $495.87 0% $495.00 $66 109 Up to 500 SF (with Calcs) $460.00 $531.77 0% $531.00 $71110 Additional Room Addition (Over 500 SF) $138.00 $159.53 0% $159.00 $21111 Additional Room Addition (Over 500 SF with Calcs) $167.90 $194.10 0% $194.00 $26112 Room Addition - Multi-story:113 Up to 500 SF $460.00 $531.77 0% $531.00 $71114 Up to 500 SF (with Calcs) $397.90 $459.98 0% $459.00 $61115 Additional Room Addition (Over 500 SF) $138.00 $159.53 0% $159.00 $21116 Additional Room Addition (Over 500 SF with Calcs) $167.90 $194.10 0% $194.00 $26117 Sauna - Steam $276.00 $319.06 0% $319.00 $43 118 Sliding:119 Stone and Brick Veneer (Interior or Exterior - Up to 400 SF) $184.00 $212.71 0% $212.00 $28120 All Other (Up to 400 SF) $138.00 $159.53 0% $159.00 $21121 Additional Siding (Each 400 SF) $14.95 $17.28 2% $17.00 $2 122 Signs:

Attachment
A

Page 374 of 445 ends

BUILDING FEES
# Title
Current
Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ 123 Permanent $184.00 $212.71 0% $212.00 $28124 Temporary $138.00 $159.53 0% $159.00 $21125 Directional $138.00 $159.53 0% $159.00 $21 126 Each Additional Directional Sign $31.05 $35.89 2% $35.00 $4127 Freeway Sign $397.90 $459.98 0% $459.00 $61 128 Freeway Sign with Master Plan $550.85 $636.79 0% $636.00 $85 129 Ground/Roof/Projecting Signs $276.00 $319.06 0% $319.00 $43130 Wall/Awning Sign, Non-Electric $123.05 $142.25 0% $142.00 $19 131 Wall, Electric $152.95 $176.81 0% $176.00 $23132 Skylight:133 Less Than 10 SF $167.90 $194.10 0% $194.00 $26134 Greater Than 10 SF or Structural $244.95 $283.17 0% $283.00 $38 135 Spa or Hot Tub (Pre-Fabricated) $138.00 $159.53 0% $159.00 $21 136 Stairs - First Flight $184.00 $212.71 0% $212.00 $28 137 Each Additional Flight $46.00 $53.18 0% $53.00 $7138 Storage Racks:139 0-8' High (Up to 100 LF) $152.95 $176.81 0% $176.00 $23140 Each Additional 100 LF $31.05 $35.89 2% $35.00 $4 141 Over 8' High (Up to 100 LF) $198.95 $229.99 0% $229.00 $30142 Each Additional 100 LF $46.00 $53.18 0% $53.00 $7 143 Street Address Change or Addition $395.00 $456.63 0% $456.00 $61144 Swimming Pool / Spa:145 Vinyl-Lined (Up to 800 SF) $322.00 $372.24 0% $372.00 $50 146 Fiberglass $336.95 $389.52 0% $389.00 $52147 Gunite - Custom and to Establish Master (Up to 800 SF) $550.85 $636.79 0% $636.00 $85148 Additional Pool (Over 800 SF) $92.00 $106.35 0% $106.00 $14149 Commercial Pool (Up to 800 SF) $474.95 $549.05 0% $549.00 $74150 Commercial Pool (Over 800 SF) $504.85 $583.61 0% $583.00 $78151 Temporary Utility Connection $152.95 $176.81 0% $176.00 $23152 Temporary Occupancy Certificate (30 day increment) $1,000.00 each Max of 3 total of 90 days. $1,156.02 0% $1,156.00 $156 153 Window or Sliding Glass Door:154 Window or Sliding Glass Door - 10) $152.95 $176.81 0% $176.00 $23 155 New Window (Non-Structural) (Each 10) $184.00 $212.71 0% $212.00 $28 156 New Window (Structural Shear Wall/Masonry) (Each 10) $213.90 $247.27 0% $247.00 $33 157 Bay Window (Structural) $244.95 $283.17 0% $283.00 $38158 Carnivals and Tents $184.00 $212.71 0% $212.00 $28 159 Underground Storage Tanks installation/removal $230.00 per tank $265.88 0% $265.00 $35160 ADA Ramps $184.00 $212.71 0% $212.00 $28 161 Research (first 1/2 hour) $172.50 $199.41 0% $199.00 $27162 Each additional 1/2 hour (or portion thereof) $86.25 $99.71 1% $99.00 $13163 Pre-Plan Inspection (first hour) $133.00 $153.75 0% $153.00 $20 Attachment
A

Page 375 of 445 ends

BUILDING FEES
# Title
Current
Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ 164 Pre-Plan Inspection (additional hour) $133.00 $153.75 0% $153.00 $20165 Supplemental Plan Check Fee (@ Counter) $152.95 per hour $176.81 0% $176.00 $23166 Supplemental Inspection Fee (per hour) $152.95 $176.81 0% $176.00 $23 167 Change of Contractor $46.00 $53.18 0% $53.00 $7
168 Code Compliance Inspections/Reinspection $253.00 $292.47 0% $292.00 $39 169 Emergency (Non-Scheduled) Call-Out Fee (4 hours min) $611.80 $707.25 0% $707.00 $95170 After Hours (Scheduled) Call-Out Fee (2 hours min) $305.90 $353.63 0% $353.00 $47171 Each additional call-out hour $152.95 $176.81 0% $176.00 $23172 Re-Check Fee (first 1/2-hour) $86.25 $99.71 1% $99.00 $13173 Each additional 1/2 hour (or portion thereof) $75.00 $86.70 1% $86.00 $11174 Reinspection Fee (first 1/2 hour) $86.25 $99.71 1% $99.00 $13 175 Each additional 1/2 hour (or portion thereof) $75.00 $86.70 1% $86.00 $11176 Fire Safe Standards Review $152.95 (SRA - per hour) $176.81 0% $176.00 $23177 FEMA Flood Zone Review $152.95 per hour $176.81 0% $176.00 $23178 Soils Review (up to 1/2 hour) $86.25 $99.71 1% $99.00 $13 179 Special Inspector Application (new item) $51.05 $59.01 0% $59.00 $8180 Deed Restriction (up to 1/2 hour) $86.25 $99.71 1% $99.00 $13 181 Each additional 1/2 hour (or portion thereof) $86.25 $99.71 1% $99.00 $13 182 Travel and Documentation (standard) $41.40 $47.86 2% $47.00 $6 183 Travel and Documentation (additional trip) $41.40 $47.86 2% $47.00 $6184 Permit Issuance (B,M,E,P) $17.25 $72.13 0% $72.00 $55185 Reinspection Fee $133.00 per hour $153.75 0% $153.00 $20186 Mechancial187 Stand Alone Mechanical Plan Check $152.95 per hour $176.81 0% $176.00 $23188 A/C (Residential) $33.00 $38.15 0% $38.00 $5 189 Furnaces (F.A.U., Floor) $33.00 $38.15 0% $38.00 $5 190 Heater (Wall) $33.00 $38.15 0% $38.00 $5191 Appliance Vent / Chimney (Only) $22.00 $25.43 2% $25.00 $3 192 Refridgeration Compressor $27.00 $31.21 1% $31.00 $4 193 Boiler - up to 200k BTU $27.00 $31.21 1% $31.00 $4194 Boiler - greater than 200k BTU $40.00 $46.24 1% $46.00 $6 195 Chiller $33.00 $38.15 0% $38.00 $5
196 Fan Coil Unit $22.00 $25.43 2% $25.00 $3
197 Heat Pump (Package Unit) $53.00 $61.27 0% $61.00 $8198 Heater (Unit, Radiant, etc.) $22.00 $25.43 2% $25.00 $3 199 Air Handler w/ducts to 10k CFM $18.00 $20.81 4% $20.00 $2200 Air Handler w/ducts more than 10k CFM $27.00 $31.21 1% $31.00 $4201 Duct Work only $22.00 LF $25.43 2% $25.00 $3202 Evaporative Cooler $22.00 $25.43 2% $25.00 $3 203 Make-up Air System $22.00 $25.43 2% $25.00 $3204 Moisture Exhaust Duct (Clothes Dryer) $11.00 $12.72 6% $12.00 $1 205 Variable Air Volume Box (Including Duct Work) $18.00 $20.81 4% $20.00 $2 Attachment
A

Page 376 of 445 ends

BUILDING FEES
# Title
Current
Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ 206 Vent Fan (Single Duct) $11.00 $12.72 6% $12.00 $1207 Vent System $27.00 $31.21 1% $31.00 $4208 Exhaust Hood and Duct (Residential) $18.00 $20.81 4% $20.00 $2209 Exhaust Hood - Type I (Commercial Grease Hood) $53.00 $61.27 0% $61.00 $8210 Exhaust Hood - Type II (Commercial Steam Hood) $40.00 $46.24 1% $46.00 $6 211 Non-Residential Incinerator $53.00 $61.27 0% $61.00 $8 212 Refrigerator Condenser Remote $33.00 $38.15 0% $38.00 $5213 Walk-in Box / Refrigerator Coil $27.00 $31.21 1% $31.00 $4214 Gas Meter or First Outlet $33.00 $38.15 0% $38.00 $5215 Gas Outlets (additional) $7.00 $8.09 1% $8.00 $1216 Other Mechanical Inspections $133.00 per hour $153.75 0% $153.00 $20 217 Plumbing218 Stand Alone Plumbing Plan Check $152.95 per hour $167.53 0% $167.00 $14 219 Fixtures 220 BathTub $13.00 each $15.03 0% $15.00 $2 221 Shower $13.00 $15.03 0% $15.00 $2222 Tub/Shower $13.00 $15.03 0% $15.00 $2 223 Sink $13.00 $15.03 0% $15.00 $2224 Toilet/Water Closet $13.00 $15.03 0% $15.00 $2225 Bidet $13.00 $15.03 0% $15.00 $2226 Urinal $13.00 $15.03 0% $15.00 $2 227 Kitchen Sink $13.00 $15.03 0% $15.00 $2228 Barsink $13.00 $15.03 0% $15.00 $2229 Dishwasher $13.00 $15.03 0% $15.00 $2230 Garbage Disposal $13.00 $15.03 0% $15.00 $2 231 Washing Machine $13.00 $15.03 0% $15.00 $2232 Laundry Tub/Sink $13.00 $15.03 0% $15.00 $2233 Mop Sink $13.00 $15.03 0% $15.00 $2 234 Gas Meter or First Outlet $33.00 $38.15 0% $38.00 $5 235 Gas Outlets (Additional) $7.00 $8.09 1% $8.00 $1236 Building Sewer $33.00 $38.15 0% $38.00 $5237 Grease Trap $44.00 $50.86 2% $50.00 $6 238 Interceptor/Pump $22.00 $25.43 2% $25.00 $3
239 Backflow Preventer (First 5) $18.00 $20.81 4% $20.00 $2 240 Backflow Preventer (More than 5) $9.00 $10.40 4% $10.00 $1 241 Roof Drain - Rainwater System $16.00 $18.50 3% $18.00 $2242 Water Heater $22.00 $25.43 2% $25.00 $3243 Water Pipe Repair / Replacement $100.00 $115.60 1% $115.00 $15 244 Water Service (Main) $16.00 $18.50 3% $18.00 $2245 Drain-Vent Repair / Alterations $11.00 $12.72 6% $12.00 $1246 Drinking Fountain/ Water Softener $22.00 $25.43 2% $25.00 $3 Attachment A

Page 377 of 445 ends

BUILDING FEES
# Title
Current
Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ 247 Solar Water System Fixtures (solar panels, tanks, water treatment equipment) $78.00 $90.17 0% $90.00 $12248 Swimming Pool Piping and Gas $93.00 $107.51 0% $107.00 $14249 Medical Gas System (Each Outlet) $20.00 $23.12 1% $23.00 $3250 Other Plumbing and Gas Inspections $133.00 per hour $153.75 0% $153.00 $20 251 Stand Alone Electrical Plan Check $152.95 per hour $176.81 0% $176.00 $23252 Electrical253 Single Phase Service (per 100 amps) $77.05 $89.07 0% $89.00 $12254 Single Phase Service (per 200 amps up to 400) $177.05 $204.67 0% $204.00 $27255 Three Phase Service (per 100 amps) $92.00 $106.35 0% $106.00 $14256 Three Phase Service (per 100 amps up to 400) $192.00 $221.96 0% $221.00 $29257 Switches and outlets (first 50 - new item) $2.00 $2.31 13% $2.00 $0 258 Switches and outlets (each additional 25 - new item) $1.00 $1.16 13% $1.00 $0259 15 or 20 amp (first 10 circuits) $7.00 $8.09 1% $8.00 $1260 15 or 20 amp (next 90 circuits) $2.00 $2.31 13% $2.00 $0 261 15 or 20 amp (over 100 circuits) $2.00 $2.31 13% $2.00 $0262 25 to 40 amp circuits $40.00 $46.24 1% $46.00 $6263 50 to 175 amp circuits $47.00 $54.33 1% $54.00 $7264 200 amp and larger circuits $54.00 $62.42 1% $62.00 $8 265 Temporary Service $53.00 $61.27 0% $61.00 $8266 Temporary Pole $11.00 $12.72 6% $12.00 $1267 Pre-Inspection $67.00 $77.45 1% $77.00 $10268 Sign Circuit $53.00 $61.27 0% $61.00 $8 269 Swimming Pool/Spa $67.00 $77.45 1% $77.00 $10
270 Solar Photovoltaic - Residential 1-10KVA $67.00 $77.45 1% $77.00 $10271 Solar Photovoltaic - Residential 10KVA> $67.00 $77.45 1% $77.00 $10 272 Solar Photovoltaic - Commercial $67.00 $77.45 1% $77.00 $10 273 Generator Installation $67.00 $77.45 1% $77.00 $10
274 Battery Backup or (ESS)Energy Storage System $67.00 $77.45 1% $77.00 $10275 Other Electrical Inspections $152.95 per hour $176.81 0% $176.00 $23276 "After Hours" Construction Permit $57.50 $66.47 1% $66.00 $9 277 EV Charging278 Type I $87.00 each $100.57 1% $100.00 $13 279 Type II $95.00 each $109.82 1% $109.00 $14
280 Type III $185.00 each $213.86 0% $213.00 $28281 Fire Sprinklers $5.00 per head $5.78 13% $5.00 $0.00282 Fire Alarm $152.95 $176.81 0% $176.00 $23.05283 Flat Work (up to 250 SF) $184.00 SqFt $212.71 0% $212.00 $28.00 284 Each additional > 250 SF $22.00 SqFt $25.43 2% $25.00 $3.00 Attachment
A

Page 378 of 445 ends

UBC
Class Occupancy Type
Project Size
Threshold
Current
Fee
Full Cost using
% change
needed
Suggested
Base Fee
Current Fee
for Each
Additional
100 s.f.

Full Cost
using %
change
needed
Suggested Fee
for Each
Additional 100
s.f.

Difference in
base fee
Current
Fee
Full Cost using
% change
needed
Suggested
Base Fee
Current Fee
for Each
Additional
100 s.f.

Full Cost
using ICC
per sq ft
Suggested Fee
for Each
Additional 100
s.f.

Difference in
base fee
Current
Fee
Full cost using
% change
needed
Suggested
Base Fee
Current Fee
for Each
Additional
100 s.f.

Full Cost
using ICC
per sq ft
Suggested Fee
for Each
Additional 100
s.f.

Difference in
base fee
A-1 Theater 1,000 $3,907 $4,516.56 $4,516.56 $13.13 $15.18 $15.18 $609.56 $3,256 $3,763.99 $3,763.99 $10.94 $12.65 $12.65 $507.99 $2,605 $3,011.42 $3,011.42 $8.75 $10.12 $10.12 $406.42 5,000 $4,432 $5,123.46 $5,123.46 $16.02 $18.52 $18.52 $691.46 $3,694 $4,270.32 $4,270.32 $13.35 $15.43 $15.43 $576.32 $2,955 $3,416.03 $3,416.03 $10.68 $12.35 $12.35 $461.03 10,000 $5,233 $6,049.43 $6,049.43 $8.99 $10.39 $10.39 $816.43 $4,361 $5,041.39 $5,041.39 $7.49 $8.66 $8.66 $680.39 $3,489 $4,033.34 $4,033.34 $5.99 $6.92 $6.92 $544.3420,000 $6,132 $7,088.69 $7,088.69 $3.50 $4.05 $4.05 $956.69 $5,110 $5,907.24 $5,907.24 $2.92 $3.38 $3.38 $797.24 $4,088 $4,725.79 $4,725.79 $2.33 $2.69 $2.69 $637.7950,000 $7,182 $8,302.51 $8,302.51 $4.72 $5.46 $5.46 $1,120.51 $5,985 $6,918.76 $6,918.76 $3.93 $4.54 $4.54 $933.76 $4,788 $5,535.01 $5,535.01 $3.14 $3.63 $3.63 $747.01 100,000 $9,540 $11,028.39 $11,028.39 $9.54 $11.03 $11.03 $1,488.39 $7,950 $9,190.33 $9,190.33 $7.95 $9.19 $9.19 $1,240.33 $6,360 $7,352.26 $7,352.26 $6.36 $7.35 $7.35 $992.26 A-2 Church 1,000 $3,907 $4,516.56 $4,516.56 $13.13 $15.18 $15.18 $609.56 $3,256 $3,763.99 $3,763.99 $10.94 $12.65 $12.65 $507.99 $2,605 $3,011.42 $3,011.42 $8.75 $10.12 $10.12 $406.42 5,000 $4,432 $5,123.46 $5,123.46 $16.02 $18.52 $18.52 $691.46 $3,694 $4,270.32 $4,270.32 $13.35 $15.43 $15.43 $576.32 $2,955 $3,416.03 $3,416.03 $10.68 $12.35 $12.35 $461.03 10,000 $5,233 $6,049.43 $6,049.43 $8.99 $10.39 $10.39 $816.43 $4,361 $5,041.39 $5,041.39 $7.49 $8.66 $8.66 $680.39 $3,489 $4,033.34 $4,033.34 $5.99 $6.92 $6.92 $544.3420,000 $6,132 $7,088.69 $7,088.69 $3.50 $4.05 $4.05 $956.69 $5,110 $5,907.24 $5,907.24 $2.92 $3.38 $3.38 $797.24 $4,088 $4,725.79 $4,725.79 $2.33 $2.69 $2.69 $637.7950,000 $7,182 $8,302.51 $8,302.51 $4.72 $5.46 $5.46 $1,120.51 $5,985 $6,918.76 $6,918.76 $3.93 $4.54 $4.54 $933.76 $4,788 $5,535.01 $5,535.01 $3.14 $3.63 $3.63 $747.01 100,000 $9,540 $11,028.39 $11,028.39 $9.54 $11.03 $11.03 $1,488.39 $7,950 $9,190.33 $9,190.33 $7.95 $9.19 $9.19 $1,240.33 $6,360 $7,352.26 $7,352.26 $6.36 $7.35 $7.35 $992.26 A-2.1 Auditorium 1,000 $3,907 $4,516.56 $4,516.56 $13.13 $15.18 $15.18 $609.56 $3,256 $3,763.99 $3,763.99 $10.94 $12.65 $12.65 $507.99 $2,605 $3,011.42 $3,011.42 $8.75 $10.12 $10.12 $406.42 5,000 $4,432 $5,123.46 $5,123.46 $16.02 $18.52 $18.52 $691.46 $3,694 $4,270.32 $4,270.32 $13.35 $15.43 $15.43 $576.32 $2,955 $3,416.03 $3,416.03 $10.68 $12.35 $12.35 $461.03 10,000 $5,233 $6,049.43 $6,049.43 $8.99 $10.39 $10.39 $816.43 $4,361 $5,041.39 $5,041.39 $7.49 $8.66 $8.66 $680.39 $3,489 $4,033.34 $4,033.34 $5.99 $6.92 $6.92 $544.3420,000 $6,132 $7,088.69 $7,088.69 $3.50 $4.05 $4.05 $956.69 $5,110 $5,907.24 $5,907.24 $2.92 $3.38 $3.38 $797.24 $4,088 $4,725.79 $4,725.79 $2.33 $2.69 $2.69 $637.7950,000 $7,182 $8,302.51 $8,302.51 $4.72 $5.46 $5.46 $1,120.51 $5,985 $6,918.76 $6,918.76 $3.93 $4.54 $4.54 $933.76 $4,788 $5,535.01 $5,535.01 $3.14 $3.63 $3.63 $747.01 100,000 $9,540 $11,028.39 $11,028.39 $9.54 $11.03 $11.03 $1,488.39 $7,950 $9,190.33 $9,190.33 $7.95 $9.19 $9.19 $1,240.33 $6,360 $7,352.26 $7,352.26 $6.36 $7.35 $7.35 $992.26 A-2.1 Restaurant 1,000 $4,698 $5,430.96 $5,430.96 $15.76 $18.22 $18.22 $732.96 $3,915 $4,525.80 $4,525.80 $13.13 $15.18 $15.18 $610.80 $3,132 $3,620.64 $3,620.64 $10.51 $12.15 $12.15 $488.64 5,000 $5,328 $6,159.25 $6,159.25 $19.23 $22.23 $22.23 $831.25 $4,440 $5,132.71 $5,132.71 $16.03 $18.53 $18.53 $692.71 $3,552 $4,106.17 $4,106.17 $12.82 $14.82 $14.82 $554.17 10,000 $6,290 $7,271.34 $7,271.34 $10.82 $12.51 $12.51 $981.34 $5,241 $6,058.68 $6,058.68 $9.01 $10.42 $10.42 $817.68 $4,193 $4,847.18 $4,847.18 $7.21 $8.33 $8.33 $654.1820,000 $7,371 $8,520.99 $8,520.99 $4.21 $4.87 $4.87 $1,149.99 $6,143 $7,101.41 $7,101.41 $3.50 $4.05 $4.05 $958.41 $4,914 $5,680.66 $5,680.66 $2.80 $3.24 $3.24 $766.6650,000 $8,633 $9,979.89 $9,979.89 $5.66 $6.54 $6.54 $1,346.89 $7,194 $8,316.38 $8,316.38 $4.71 $5.44 $5.44 $1,122.38 $5,755 $6,652.87 $6,652.87 $3.77 $4.36 $4.36 $897.87 100,000 $11,460 $13,247.94 $13,247.94 $11.46 $13.25 $13.25 $1,787.94 $9,550 $11,039.95 $11,039.95 $9.55 $11.04 $11.04 $1,489.95 $7,640 $8,831.96 $8,831.96 $7.64 $8.83 $8.83 $1,191.96 A-3 Small Assembly Buildings 100 $2,338 $2,702.77 $2,702.77 $75.07 $86.78 $86.78 $364.77 $1,949 $2,253.08 $2,253.08 $62.56 $72.32 $72.32 $304.08 $1,559 $1,802.23 $1,802.23 $50.05 $57.86 $57.86 $243.23 500 $2,639 $3,050.73 $3,050.73 $91.53 $105.81 $105.81 $411.73 $2,199 $2,542.08 $2,542.08 $76.28 $88.18 $88.18 $343.08 $1,759 $2,033.43 $2,033.43 $61.02 $70.54 $70.54 $274.43 1,000 $3,096 $3,579.03 $3,579.03 $51.48 $59.51 $59.51 $483.03 $2,580 $2,982.52 $2,982.52 $42.90 $49.59 $49.59 $402.52 $2,064 $2,386.02 $2,386.02 $34.32 $39.67 $39.67 $322.022,000 $3,611 $4,174.37 $4,174.37 $20.01 $23.13 $23.13 $563.37 $3,009 $3,478.45 $3,478.45 $16.67 $19.27 $19.27 $469.45 $2,407 $2,782.53 $2,782.53 $13.34 $15.42 $15.42 $375.535,000 $4,211 $4,867.98 $4,867.98 $26.90 $31.10 $31.10 $656.98 $3,509 $4,056.46 $4,056.46 $22.41 $25.91 $25.91 $547.46 $2,808 $3,246.09 $3,246.09 $17.93 $20.73 $20.73 $438.09 10,000 $5,556 $6,422.83 $6,422.83 $55.56 $64.23 $64.23 $866.83 $4,630 $5,352.35 $5,352.35 $46.30 $53.52 $53.52 $722.35 $3,704 $4,281.88 $4,281.88 $37.04 $42.82 $42.82 $577.88 A-3 Bowling Alley 1,000 $2,420 $2,797.56 $2,797.56 $7.92 $9.16 $9.16 $377.56 $2,017 $2,331.68 $2,331.68 $6.60 $7.63 $7.63 $314.68 $1,613 $1,864.65 $1,864.65 $5.28 $6.10 $6.10 $251.65 5,000 $2,737 $3,164.02 $3,164.02 $9.66 $11.17 $11.17 $427.02 $2,281 $2,636.87 $2,636.87 $8.05 $9.31 $9.31 $355.87 $1,824 $2,108.57 $2,108.57 $6.44 $7.44 $7.44 $284.57 10,000 $3,220 $3,722.37 $3,722.37 $5.44 $6.29 $6.29 $502.37 $2,683 $3,101.59 $3,101.59 $4.53 $5.24 $5.24 $418.59 $2,146 $2,480.81 $2,480.81 $3.62 $4.18 $4.18 $334.8120,000 $3,763 $4,350.09 $4,350.09 $2.12 $2.45 $2.45 $587.09 $3,136 $3,625.27 $3,625.27 $1.76 $2.03 $2.03 $489.27 $2,509 $2,900.44 $2,900.44 $1.41 $1.63 $1.63 $391.4450,000 $4,398 $5,084.16 $5,084.16 $2.84 $3.28 $3.28 $686.16 $3,665 $4,236.80 $4,236.80 $2.37 $2.74 $2.74 $571.80 $2,932 $3,389.44 $3,389.44 $1.90 $2.20 $2.20 $457.44 100,000 $5,820 $6,728.01 $6,728.01 $5.82 $6.73 $6.73 $908.01 $4,850 $5,606.68 $5,606.68 $4.85 $5.61 $5.61 $756.68 $3,880 $4,485.34 $4,485.34 $3.88 $4.49 $4.49 $605.34 A-3 Library / Museum 1,000 $3,025 $3,496.95 $3,496.95 $9.90 $11.44 $11.44 $471.95 $2,521 $2,914.32 $2,914.32 $8.25 $9.54 $9.54 $393.32 $2,017 $2,331.68 $2,331.68 $6.60 $7.63 $7.63 $314.68 5,000 $3,421 $3,954.73 $3,954.73 $12.08 $13.96 $13.96 $533.73 $2,851 $3,295.80 $3,295.80 $10.06 $11.63 $11.63 $444.80 $2,281 $2,636.87 $2,636.87 $8.05 $9.31 $9.31 $355.87 10,000 $4,025 $4,652.96 $4,652.96 $6.80 $7.86 $7.86 $627.96 $3,354 $3,877.28 $3,877.28 $5.66 $6.54 $6.54 $523.28 $2,683 $3,101.59 $3,101.59 $4.53 $5.24 $5.24 $418.5920,000 $4,704 $5,437.90 $5,437.90 $2.65 $3.06 $3.06 $733.90 $3,920 $4,531.58 $4,531.58 $2.20 $2.54 $2.54 $611.58 $3,136 $3,625.27 $3,625.27 $1.76 $2.03 $2.03 $489.2750,000 $5,498 $6,355.78 $6,355.78 $3.56 $4.12 $4.12 $857.78 $4,581 $5,295.71 $5,295.71 $2.96 $3.42 $3.42 $714.71 $3,665 $4,236.80 $4,236.80 $2.37 $2.74 $2.74 $571.80 100,000 $7,275 $8,410.02 $8,410.02 $7.28 $8.42 $8.42 $1,135.02 $6,063 $7,008.93 $7,008.93 $6.06 $7.01 $7.01 $945.93 $4,850 $5,606.68 $5,606.68 $4.85 $5.61 $5.61 $756.68 B Banks 1,000 $3,918 $4,529.27 $4,529.27 $13.18 $15.24 $15.24 $611.27 $3,265 $3,774.39 $3,774.39 $10.98 $12.69 $12.69 $509.39 $2,612 $3,019.51 $3,019.51 $8.78 $10.15 $10.15 $407.51 5,000 $4,445 $5,138.49 $5,138.49 $16.04 $18.54 $18.54 $693.49 $3,705 $4,283.04 $4,283.04 $13.37 $15.46 $15.46 $578.04 $2,964 $3,426.43 $3,426.43 $10.70 $12.37 $12.37 $462.43 10,000 $5,248 $6,066.77 $6,066.77 $9.04 $10.45 $10.45 $818.77 $4,373 $5,055.26 $5,055.26 $7.53 $8.70 $8.70 $682.26 $3,498 $4,043.74 $4,043.74 $6.02 $6.96 $6.96 $545.7420,000 $6,151 $7,110.66 $7,110.66 $3.52 $4.07 $4.07 $959.66 $5,126 $5,925.74 $5,925.74 $2.93 $3.39 $3.39 $799.74 $4,101 $4,740.82 $4,740.82 $2.34 $2.71 $2.71 $639.8250,000 $7,206 $8,330.25 $8,330.25 $4.72 $5.46 $5.46 $1,124.25 $6,005 $6,941.88 $6,941.88 $3.93 $4.54 $4.54 $936.88 $4,804 $5,553.50 $5,553.50 $3.14 $3.63 $3.63 $749.50 100,000 $9,564 $11,056.14 $11,056.14 $9.56 $11.05 $11.05 $1,492.14 $7,970 $9,213.45 $9,213.45 $7.97 $9.21 $9.21 $1,243.45 $6,376 $7,370.76 $7,370.76 $6.38 $7.38 $7.38 $994.76 B Car Wash 1,000 $2,328 $2,691.21 $2,691.21 $7.61 $8.80 $8.80 $363.21 $1,940 $2,242.67 $2,242.67 $6.35 $7.34 $7.34 $302.67 $1,552 $1,794.14 $1,794.14 $5.08 $5.87 $5.87 $242.14 5,000 $2,633 $3,043.79 $3,043.79 $9.26 $10.70 $10.70 $410.79 $2,194 $2,536.30 $2,536.30 $7.72 $8.92 $8.92 $342.30 $1,755 $2,028.81 $2,028.81 $6.18 $7.14 $7.14 $273.81 10,000 $3,096 $3,579.03 $3,579.03 $5.21 $6.02 $6.02 $483.03 $2,580 $2,982.52 $2,982.52 $4.34 $5.02 $5.02 $402.52 $2,064 $2,386.02 $2,386.02 $3.47 $4.01 $4.01 $322.0220,000 $3,617 $4,181.31 $4,181.31 $2.02 $2.34 $2.34 $564.31 $3,014 $3,484.23 $3,484.23 $1.69 $1.95 $1.95 $470.23 $2,411 $2,787.15 $2,787.15 $1.35 $1.56 $1.56 $376.1550,000 $4,224 $4,883.01 $4,883.01 $2.74 $3.17 $3.17 $659.01 $3,520 $4,069.18 $4,069.18 $2.28 $2.64 $2.64 $549.18 $2,816 $3,255.34 $3,255.34 $1.82 $2.10 $2.10 $439.34 100,000 $5,592 $6,464.44 $6,464.44 $5.59 $6.46 $6.46 $872.44 $4,660 $5,387.04 $5,387.04 $4.66 $5.39 $5.39 $727.04 $3,728 $4,309.63 $4,309.63 $3.73 $4.31 $4.31 $581.63 B High Rise Offices 1,000 $4,479 $5,177.80 $5,177.80 $15.14 $17.50 $17.50 $698.80 $3,732 $4,314.25 $4,314.25 $12.62 $14.59 $14.59 $582.25 $2,986 $3,451.86 $3,451.86 $10.09 $11.66 $11.66 $465.86 5,000 $5,084 $5,877.19 $5,877.19 $18.46 $21.34 $21.34 $793.19 $4,237 $4,898.04 $4,898.04 $15.38 $17.78 $17.78 $661.04 $3,390 $3,918.89 $3,918.89 $12.30 $14.22 $14.22 $528.89 10,000 $6,007 $6,944.19 $6,944.19 $10.37 $11.99 $11.99 $937.19 $5,006 $5,787.02 $5,787.02 $8.64 $9.99 $9.99 $781.02 $4,005 $4,629.84 $4,629.84 $6.91 $7.99 $7.99 $624.8420,000 $7,044 $8,142.98 $8,142.98 $4.04 $4.67 $4.67 $1,098.98 $5,870 $6,785.81 $6,785.81 $3.37 $3.90 $3.90 $915.81 $4,696 $5,428.65 $5,428.65 $2.69 $3.11 $3.11 $732.6550,000 $8,256 $9,544.07 $9,544.07 $5.42 $6.27 $6.27 $1,288.07 $6,880 $7,953.39 $7,953.39 $4.52 $5.23 $5.23 $1,073.39 $5,504 $6,362.71 $6,362.71 $3.62 $4.18 $4.18 $858.71 100,000 $10,968 $12,679.18 $12,679.18 $10.97 $12.68 $12.68 $1,711.18 $9,140 $10,565.99 $10,565.99 $9.14 $10.57 $10.57 $1,425.99 $7,312 $8,452.79 $8,452.79 $7.31 $8.45 $8.45 $1,140.79 B High Rise Offices - Phased Permits 1,000 $4,479 $5,177.80 $5,177.80 $15.14 $17.50 $17.50 $698.80 $3,732 $4,314.25 $4,314.25 $12.62 $14.59 $14.59 $582.25 $2,986 $3,451.86 $3,451.86 $10.09 $11.66 $11.66 $465.86 5,000 $5,084 $5,877.19 $5,877.19 $18.46 $21.34 $21.34 $793.19 $4,237 $4,898.04 $4,898.04 $15.38 $17.78 $17.78 $661.04 $3,390 $3,918.89 $3,918.89 $12.30 $14.22 $14.22 $528.89 10,000 $6,007 $6,944.19 $6,944.19 $10.37 $11.99 $11.99 $937.19 $5,006 $5,787.02 $5,787.02 $8.64 $9.99 $9.99 $781.02 $4,005 $4,629.84 $4,629.84 $6.91 $7.99 $7.99 $624.8420,000 $7,044 $8,142.98 $8,142.98 $4.04 $4.67 $4.67 $1,098.98 $5,870 $6,785.81 $6,785.81 $3.37 $3.90 $3.90 $915.81 $4,696 $5,428.65 $5,428.65 $2.69 $3.11 $3.11 $732.6550,000 $8,256 $9,544.07 $9,544.07 $5.42 $6.27 $6.27 $1,288.07 $6,880 $7,953.39 $7,953.39 $4.52 $5.23 $5.23 $1,073.39 $5,504 $6,362.71 $6,362.71 $3.62 $4.18 $4.18 $858.71 100,000 $10,968 $12,679.18 $12,679.18 $10.97 $12.68 $12.68 $1,711.18 $9,140 $10,565.99 $10,565.99 $9.14 $10.57 $10.57 $1,425.99 $7,312 $8,452.79 $8,452.79 $7.31 $8.45 $8.45 $1,140.79 B Laundromat 100 $2,481 $2,868.08 $2,868.08 $80.08 $92.57 $92.57 $387.08 $2,068 $2,390.64 $2,390.64 $66.73 $77.14 $77.14 $322.64 $1,654 $1,912.05 $1,912.05 $53.39 $61.72 $61.72 $258.05 500 $2,802 $3,239.16 $3,239.16 $97.62 $112.85 $112.85 $437.16 $2,335 $2,699.30 $2,699.30 $81.35 $94.04 $94.04 $364.30 $1,868 $2,159.44 $2,159.44 $65.08 $75.23 $75.23 $291.44 1,000 $3,290 $3,803.29 $3,803.29 $54.90 $63.47 $63.47 $513.29 $2,742 $3,169.80 $3,169.80 $45.75 $52.89 $52.89 $427.80 $2,193 $2,535.14 $2,535.14 $36.60 $42.31 $42.31 $342.142,000 $3,839 $4,437.95 $4,437.95 $21.37 $24.70 $24.70 $598.95 $3,199 $3,698.10 $3,698.10 $17.80 $20.58 $20.58 $499.10 $2,559 $2,958.25 $2,958.25 $14.24 $16.46 $16.46 $399.255,000 $4,480 $5,178.95 $5,178.95 $28.67 $33.14 $33.14 $698.95 $3,733 $4,315.41 $4,315.41 $23.89 $27.62 $27.62 $582.41 $2,987 $3,453.02 $3,453.02 $19.11 $22.09 $22.09 $466.02 10,000 $5,913 $6,835.52 $6,835.52 $59.13 $68.36 $68.36 $922.52 $4,928 $5,696.85 $5,696.85 $49.28 $56.97 $56.97 $768.85 $3,942 $4,557.02 $4,557.02 $39.42 $45.57 $45.57 $615.02 B Medical Office 1,000 $4,898 $5,662.17 $5,662.17 $16.47 $19.04 $19.04 $764.17 $4,082 $4,718.86 $4,718.86 $13.73 $15.87 $15.87 $636.86 $3,265 $3,774.39 $3,774.39 $10.98 $12.69 $12.69 $509.39

CITY OF COVINA

CONSOLIDATED SCHEDULE OF NEW CONSTRUCTION FEES (P/C PROCESSING AND INSPECTION COMBINED) (All Construction Types)

NEW CONSTRUCTION
Types IA Types IB, IIA, IIIA, VA Types IIB, IIIB, IV, VB Attachment
A

Page 379 of 445 ends

UBC
Class Occupancy Type
Project Size
Threshold
Current
Fee
Full Cost using
% change
needed
Suggested
Base Fee
Current Fee
for Each
Additional
100 s.f.

Full Cost
using %
change
needed
Suggested Fee
for Each
Additional 100
s.f.

Difference in
base fee
Current
Fee
Full Cost using
% change
needed
Suggested
Base Fee
Current Fee
for Each
Additional
100 s.f.

Full Cost
using ICC
per sq ft
Suggested Fee
for Each
Additional 100
s.f.

Difference in
base fee
Current
Fee
Full cost using
% change
needed
Suggested
Base Fee
Current Fee
for Each
Additional
100 s.f.

Full Cost
using ICC
per sq ft
Suggested Fee
for Each
Additional 100
s.f.

Difference in
base fee

CITY OF COVINA

CONSOLIDATED SCHEDULE OF NEW CONSTRUCTION FEES (P/C PROCESSING AND INSPECTION COMBINED) (All Construction Types)

NEW CONSTRUCTION
Types IA Types IB, IIA, IIIA, VA Types IIB, IIIB, IV, VB 5,000 $5,557 $6,423.98 $6,423.98 $20.06 $23.19 $23.19 $866.98 $4,631 $5,353.51 $5,353.51 $16.71 $19.32 $19.32 $722.51 $3,705 $4,283.04 $4,283.04 $13.37 $15.46 $15.46 $578.04 10,000 $6,560 $7,583.47 $7,583.47 $11.30 $13.06 $13.06 $1,023.47 $5,466 $6,318.78 $6,318.78 $9.41 $10.88 $10.88 $852.78 $4,373 $5,055.26 $5,055.26 $7.53 $8.70 $8.70 $682.2620,000 $7,689 $8,888.61 $8,888.61 $4.40 $5.09 $5.09 $1,199.61 $6,408 $7,407.75 $7,407.75 $3.66 $4.23 $4.23 $999.75 $5,126 $5,925.74 $5,925.74 $2.93 $3.39 $3.39 $799.7450,000 $9,008 $10,413.39 $10,413.39 $5.90 $6.82 $6.82 $1,405.39 $7,506 $8,677.06 $8,677.06 $4.91 $5.68 $5.68 $1,171.06 $6,005 $6,941.88 $6,941.88 $3.93 $4.54 $4.54 $936.88 100,000 $11,955 $13,820.17 $13,820.17 $11.96 $13.83 $13.83 $1,865.17 $9,963 $11,517.39 $11,517.39 $9.96 $11.51 $11.51 $1,554.39 $7,970 $9,213.45 $9,213.45 $7.97 $9.21 $9.21 $1,243.45 B Offices 1,000 $3,096 $3,579.03 $3,579.03 $10.16 $11.75 $11.75 $483.03 $2,580 $2,982.52 $2,982.52 $8.46 $9.78 $9.78 $402.52 $2,064 $2,386.02 $2,386.02 $6.77 $7.83 $7.83 $322.02 5,000 $3,503 $4,049.52 $4,049.52 $12.39 $14.32 $14.32 $546.52 $2,919 $3,374.41 $3,374.41 $10.33 $11.94 $11.94 $455.41 $2,335 $2,699.30 $2,699.30 $8.26 $9.55 $9.55 $364.30 10,000 $4,122 $4,765.10 $4,765.10 $6.96 $8.05 $8.05 $643.10 $3,435 $3,970.92 $3,970.92 $5.80 $6.70 $6.70 $535.92 $2,748 $3,176.73 $3,176.73 $4.64 $5.36 $5.36 $428.7320,000 $4,818 $5,569.69 $5,569.69 $2.72 $3.14 $3.14 $751.69 $4,015 $4,641.40 $4,641.40 $2.26 $2.61 $2.61 $626.40 $3,212 $3,713.12 $3,713.12 $1.81 $2.09 $2.09 $501.1250,000 $5,633 $6,511.84 $6,511.84 $3.65 $4.22 $4.22 $878.84 $4,694 $5,426.34 $5,426.34 $3.04 $3.51 $3.51 $732.34 $3,755 $4,340.84 $4,340.84 $2.43 $2.81 $2.81 $585.84 100,000 $7,455 $8,618.10 $8,618.10 $7.46 $8.62 $8.62 $1,163.10 $6,213 $7,182.33 $7,182.33 $6.21 $7.18 $7.18 $969.33 $4,970 $5,745.40 $5,745.40 $4.97 $5.75 $5.75 $775.40 B Offices - Phased Permits 1,000 $3,096 $3,579.03 $3,579.03 $10.16 $11.75 $11.75 $483.03 $2,580 $2,982.52 $2,982.52 $8.46 $9.78 $9.78 $402.52 $2,064 $2,386.02 $2,386.02 $6.77 $7.83 $7.83 $322.02 5,000 $3,503 $4,049.52 $4,049.52 $12.39 $14.32 $14.32 $546.52 $2,919 $3,374.41 $3,374.41 $10.33 $11.94 $11.94 $455.41 $2,335 $2,699.30 $2,699.30 $8.26 $9.55 $9.55 $364.30 10,000 $4,122 $4,765.10 $4,765.10 $6.96 $8.05 $8.05 $643.10 $3,435 $3,970.92 $3,970.92 $5.80 $6.70 $6.70 $535.92 $2,748 $3,176.73 $3,176.73 $4.64 $5.36 $5.36 $428.7320,000 $4,818 $5,569.69 $5,569.69 $2.72 $3.14 $3.14 $751.69 $4,015 $4,641.40 $4,641.40 $2.26 $2.61 $2.61 $626.40 $3,212 $3,713.12 $3,713.12 $1.81 $2.09 $2.09 $501.1250,000 $5,633 $6,511.84 $6,511.84 $3.65 $4.22 $4.22 $878.84 $4,694 $5,426.34 $5,426.34 $3.04 $3.51 $3.51 $732.34 $3,755 $4,340.84 $4,340.84 $2.43 $2.81 $2.81 $585.84 100,000 $7,455 $8,618.10 $8,618.10 $7.46 $8.62 $8.62 $1,163.10 $6,213 $7,182.33 $7,182.33 $6.21 $7.18 $7.18 $969.33 $4,970 $5,745.40 $5,745.40 $4.97 $5.75 $5.75 $775.40 B Public Buildings - Fire Stations 1,000 $2,443 $2,824.15 $2,824.15 $8.01 $9.26 $9.26 $381.15 $2,036 $2,353.65 $2,353.65 $6.67 $7.71 $7.71 $317.65 $1,628 $1,881.99 $1,881.99 $5.34 $6.17 $6.17 $253.99 5,000 $2,763 $3,194.07 $3,194.07 $9.76 $11.28 $11.28 $431.07 $2,303 $2,662.31 $2,662.31 $8.13 $9.40 $9.40 $359.31 $1,842 $2,129.38 $2,129.38 $6.50 $7.51 $7.51 $287.38 10,000 $3,251 $3,758.21 $3,758.21 $5.48 $6.33 $6.33 $507.21 $2,709 $3,131.65 $3,131.65 $4.57 $5.28 $5.28 $422.65 $2,167 $2,505.09 $2,505.09 $3.66 $4.23 $4.23 $338.0920,000 $3,799 $4,391.71 $4,391.71 $2.14 $2.47 $2.47 $592.71 $3,166 $3,659.95 $3,659.95 $1.78 $2.06 $2.06 $493.95 $2,533 $2,928.19 $2,928.19 $1.42 $1.64 $1.64 $395.1950,000 $4,440 $5,132.71 $5,132.71 $2.88 $3.33 $3.33 $692.71 $3,700 $4,277.26 $4,277.26 $2.40 $2.77 $2.77 $577.26 $2,960 $3,421.81 $3,421.81 $1.92 $2.22 $2.22 $461.81 100,000 $5,880 $6,797.37 $6,797.37 $5.88 $6.80 $6.80 $917.37 $4,900 $5,664.48 $5,664.48 $4.90 $5.66 $5.66 $764.48 $3,920 $4,531.58 $4,531.58 $3.92 $4.53 $4.53 $611.58 B Public Buildings - Miscellaneous 1,000 $2,420 $2,797.56 $2,797.56 $7.92 $9.16 $9.16 $377.56 $2,017 $2,331.68 $2,331.68 $6.60 $7.63 $7.63 $314.68 $1,613 $1,864.65 $1,864.65 $5.28 $6.10 $6.10 $251.65 5,000 $2,737 $3,164.02 $3,164.02 $9.66 $11.17 $11.17 $427.02 $2,281 $2,636.87 $2,636.87 $8.05 $9.31 $9.31 $355.87 $1,824 $2,108.57 $2,108.57 $6.44 $7.44 $7.44 $284.57 10,000 $3,220 $3,722.37 $3,722.37 $5.44 $6.29 $6.29 $502.37 $2,683 $3,101.59 $3,101.59 $4.53 $5.24 $5.24 $418.59 $2,146 $2,480.81 $2,480.81 $3.62 $4.18 $4.18 $334.8120,000 $3,763 $4,350.09 $4,350.09 $2.12 $2.45 $2.45 $587.09 $3,136 $3,625.27 $3,625.27 $1.76 $2.03 $2.03 $489.27 $2,509 $2,900.44 $2,900.44 $1.41 $1.63 $1.63 $391.4450,000 $4,398 $5,084.16 $5,084.16 $2.84 $3.28 $3.28 $686.16 $3,665 $4,236.80 $4,236.80 $2.37 $2.74 $2.74 $571.80 $2,932 $3,389.44 $3,389.44 $1.90 $2.20 $2.20 $457.44 100,000 $5,820 $6,728.01 $6,728.01 $5.82 $6.73 $6.73 $908.01 $4,850 $5,606.68 $5,606.68 $4.85 $5.61 $5.61 $756.68 $3,880 $4,485.34 $4,485.34 $3.88 $4.49 $4.49 $605.34 B Public Building - Office 1,000 $3,025 $3,496.95 $3,496.95 $9.90 $11.44 $11.44 $471.95 $2,521 $2,914.32 $2,914.32 $8.25 $9.54 $9.54 $393.32 $2,017 $2,331.68 $2,331.68 $6.60 $7.63 $7.63 $314.68 5,000 $3,421 $3,954.73 $3,954.73 $12.08 $13.96 $13.96 $533.73 $2,851 $3,295.80 $3,295.80 $10.06 $11.63 $11.63 $444.80 $2,281 $2,636.87 $2,636.87 $8.05 $9.31 $9.31 $355.87 10,000 $4,025 $4,652.96 $4,652.96 $6.80 $7.86 $7.86 $627.96 $3,354 $3,877.28 $3,877.28 $5.66 $6.54 $6.54 $523.28 $2,683 $3,101.59 $3,101.59 $4.53 $5.24 $5.24 $418.5920,000 $4,704 $5,437.90 $5,437.90 $2.65 $3.06 $3.06 $733.90 $3,920 $4,531.58 $4,531.58 $2.20 $2.54 $2.54 $611.58 $3,136 $3,625.27 $3,625.27 $1.76 $2.03 $2.03 $489.2750,000 $5,498 $6,355.78 $6,355.78 $3.56 $4.12 $4.12 $857.78 $4,581 $5,295.71 $5,295.71 $2.96 $3.42 $3.42 $714.71 $3,665 $4,236.80 $4,236.80 $2.37 $2.74 $2.74 $571.80 100,000 $7,275 $8,410.02 $8,410.02 $7.28 $8.42 $8.42 $1,135.02 $6,063 $7,008.93 $7,008.93 $6.06 $7.01 $7.01 $945.93 $4,850 $5,606.68 $5,606.68 $4.85 $5.61 $5.61 $756.68 B Public Buildings - Police 1,000 $2,534 $2,929.34 $2,929.34 $8.33 $9.63 $9.63 $395.34 $2,112 $2,441.51 $2,441.51 $6.94 $8.02 $8.02 $329.51 $1,689 $1,952.51 $1,952.51 $5.55 $6.42 $6.42 $263.51 5,000 $2,867 $3,314.30 $3,314.30 $10.14 $11.72 $11.72 $447.30 $2,390 $2,762.88 $2,762.88 $8.45 $9.77 $9.77 $372.88 $1,912 $2,210.30 $2,210.30 $6.76 $7.81 $7.81 $298.30 10,000 $3,374 $3,900.40 $3,900.40 $5.71 $6.60 $6.60 $526.40 $2,812 $3,250.72 $3,250.72 $4.76 $5.50 $5.50 $438.72 $2,250 $2,601.04 $2,601.04 $3.81 $4.40 $4.40 $351.0420,000 $3,946 $4,561.64 $4,561.64 $2.23 $2.58 $2.58 $615.64 $3,288 $3,800.98 $3,800.98 $1.86 $2.15 $2.15 $512.98 $2,630 $3,040.32 $3,040.32 $1.49 $1.72 $1.72 $410.3250,000 $4,614 $5,333.86 $5,333.86 $2.99 $3.46 $3.46 $719.86 $3,845 $4,444.88 $4,444.88 $2.49 $2.88 $2.88 $599.88 $3,076 $3,555.91 $3,555.91 $1.99 $2.30 $2.30 $479.91 100,000 $6,108 $7,060.95 $7,060.95 $6.11 $7.06 $7.06 $952.95 $5,090 $5,884.12 $5,884.12 $5.09 $5.88 $5.88 $794.12 $4,072 $4,707.30 $4,707.30 $4.07 $4.70 $4.70 $635.30 B Public Buildings - Recreation 1,000 $2,420 $2,797.56 $2,797.56 $7.92 $9.16 $9.16 $377.56 $2,017 $2,331.68 $2,331.68 $6.60 $7.63 $7.63 $314.68 $1,613 $1,864.65 $1,864.65 $5.28 $6.10 $6.10 $251.65 5,000 $2,737 $3,164.02 $3,164.02 $9.66 $11.17 $11.17 $427.02 $2,281 $2,636.87 $2,636.87 $8.05 $9.31 $9.31 $355.87 $1,824 $2,108.57 $2,108.57 $6.44 $7.44 $7.44 $284.57 10,000 $3,220 $3,722.37 $3,722.37 $5.44 $6.29 $6.29 $502.37 $2,683 $3,101.59 $3,101.59 $4.53 $5.24 $5.24 $418.59 $2,146 $2,480.81 $2,480.81 $3.62 $4.18 $4.18 $334.8120,000 $3,763 $4,350.09 $4,350.09 $2.12 $2.45 $2.45 $587.09 $3,136 $3,625.27 $3,625.27 $1.76 $2.03 $2.03 $489.27 $2,509 $2,900.44 $2,900.44 $1.41 $1.63 $1.63 $391.4450,000 $4,398 $5,084.16 $5,084.16 $2.84 $3.28 $3.28 $686.16 $3,665 $4,236.80 $4,236.80 $2.37 $2.74 $2.74 $571.80 $2,932 $3,389.44 $3,389.44 $1.90 $2.20 $2.20 $457.44 100,000 $5,820 $6,728.01 $6,728.01 $5.82 $6.73 $6.73 $908.01 $4,850 $5,606.68 $5,606.68 $4.85 $5.61 $5.61 $756.68 $3,880 $4,485.34 $4,485.34 $3.88 $4.49 $4.49 $605.34 E-1 Schools 500 $2,042 $2,360.58 $2,360.58 $13.21 $15.27 $15.27 $318.58 $1,702 $1,967.54 $1,967.54 $11.01 $12.73 $12.73 $265.54 $1,362 $1,574.49 $1,574.49 $8.80 $10.17 $10.17 $212.49 2,500 $2,306 $2,665.77 $2,665.77 $16.10 $18.61 $18.61 $359.77 $1,922 $2,221.86 $2,221.86 $13.42 $15.51 $15.51 $299.86 $1,538 $1,777.95 $1,777.95 $10.74 $12.42 $12.42 $239.955,000 $2,709 $3,131.65 $3,131.65 $9.06 $10.47 $10.47 $422.65 $2,258 $2,610.28 $2,610.28 $7.55 $8.73 $8.73 $352.28 $1,806 $2,087.77 $2,087.77 $6.04 $6.98 $6.98 $281.77 10,000 $3,162 $3,655.32 $3,655.32 $3.52 $4.07 $4.07 $493.32 $2,635 $3,046.10 $3,046.10 $2.93 $3.39 $3.39 $411.10 $2,108 $2,436.88 $2,436.88 $2.35 $2.72 $2.72 $328.8825,000 $3,690 $4,265.70 $4,265.70 $4.73 $5.47 $5.47 $575.70 $3,075 $3,554.75 $3,554.75 $3.94 $4.55 $4.55 $479.75 $2,460 $2,843.80 $2,843.80 $3.15 $3.64 $3.64 $383.8050,000 $4,872 $5,632.11 $5,632.11 $9.74 $11.26 $11.26 $760.11 $4,060 $4,693.43 $4,693.43 $8.12 $9.39 $9.39 $633.43 $3,248 $3,754.74 $3,754.74 $6.50 $7.51 $7.51 $506.74 E-2 Preschool / School 500 $2,042 $2,360.58 $2,360.58 $13.21 $15.27 $15.27 $318.58 $1,702 $1,967.54 $1,967.54 $11.01 $12.73 $12.73 $265.54 $1,362 $1,574.49 $1,574.49 $8.80 $10.17 $10.17 $212.49 2,500 $2,306 $2,665.77 $2,665.77 $16.10 $18.61 $18.61 $359.77 $1,922 $2,221.86 $2,221.86 $13.42 $15.51 $15.51 $299.86 $1,538 $1,777.95 $1,777.95 $10.74 $12.42 $12.42 $239.955,000 $2,709 $3,131.65 $3,131.65 $9.06 $10.47 $10.47 $422.65 $2,258 $2,610.28 $2,610.28 $7.55 $8.73 $8.73 $352.28 $1,806 $2,087.77 $2,087.77 $6.04 $6.98 $6.98 $281.77 10,000 $3,162 $3,655.32 $3,655.32 $3.52 $4.07 $4.07 $493.32 $2,635 $3,046.10 $3,046.10 $2.93 $3.39 $3.39 $411.10 $2,108 $2,436.88 $2,436.88 $2.35 $2.72 $2.72 $328.8825,000 $3,690 $4,265.70 $4,265.70 $4.73 $5.47 $5.47 $575.70 $3,075 $3,554.75 $3,554.75 $3.94 $4.55 $4.55 $479.75 $2,460 $2,843.80 $2,843.80 $3.15 $3.64 $3.64 $383.8050,000 $4,872 $5,632.11 $5,632.11 $9.74 $11.26 $11.26 $760.11 $4,060 $4,693.43 $4,693.43 $8.12 $9.39 $9.39 $633.43 $3,248 $3,754.74 $3,754.74 $6.50 $7.51 $7.51 $506.74 E-3 Daycare 100 $1,871 $2,162.91 $2,162.91 $60.05 $69.42 $69.42 $291.91 $1,559 $1,802.23 $1,802.23 $50.05 $57.86 $57.86 $243.23 $1,247 $1,441.55 $1,441.55 $40.04 $46.29 $46.29 $194.55 500 $2,111 $2,440.35 $2,440.35 $73.22 $84.64 $84.64 $329.35 $1,759 $2,033.43 $2,033.43 $61.02 $70.54 $70.54 $274.43 $1,407 $1,626.51 $1,626.51 $48.82 $56.44 $56.44 $219.51 1,000 $2,477 $2,863.45 $2,863.45 $41.18 $47.60 $47.60 $386.45 $2,064 $2,386.02 $2,386.02 $34.32 $39.67 $39.67 $322.02 $1,651 $1,908.58 $1,908.58 $27.46 $31.74 $31.74 $257.582,000 $2,889 $3,339.73 $3,339.73 $16.00 $18.50 $18.50 $450.73 $2,407 $2,782.53 $2,782.53 $13.34 $15.42 $15.42 $375.53 $1,926 $2,226.49 $2,226.49 $10.67 $12.33 $12.33 $300.495,000 $3,369 $3,894.62 $3,894.62 $21.52 $24.88 $24.88 $525.62 $2,808 $3,246.09 $3,246.09 $17.93 $20.73 $20.73 $438.09 $2,246 $2,596.41 $2,596.41 $14.34 $16.58 $16.58 $350.41 10,000 $4,445 $5,138.49 $5,138.49 $44.45 $51.38 $51.38 $693.49 $3,704 $4,281.88 $4,281.88 $37.04 $42.82 $42.82 $577.88 $2,963 $3,425.28 $3,425.28 $29.63 $34.25 $34.25 $462.28 F-1 Industrial 1,000 $765 $884.35 $884.35 $2.00 $2.31 $2.31 $119.35 $638 $737.54 $737.54 $1.66 $1.92 $1.92 $99.54 $510 $589.57 $589.57 $1.33 $1.54 $1.54 $79.57 5,000 $845 $976.83 $976.83 $2.45 $2.83 $2.83 $131.83 $704 $813.84 $813.84 $2.04 $2.36 $2.36 $109.84 $564 $651.99 $651.99 $1.63 $1.88 $1.88 $87.99 10,000 $968 $1,119.02 $1,119.02 $1.37 $1.58 $1.58 $151.02 $806 $931.75 $931.75 $1.14 $1.32 $1.32 $125.75 $645 $745.63 $745.63 $0.91 $1.05 $1.05 $100.6320,000 $1,104 $1,276.24 $1,276.24 $0.54 $0.62 $0.62 $172.24 $920 $1,063.53 $1,063.53 $0.45 $0.52 $0.52 $143.53 $736 $850.83 $850.83 $0.36 $0.42 $0.42 $114.8350,000 $1,268 $1,465.83 $1,465.83 $0.71 $0.82 $0.82 $197.83 $1,056 $1,220.75 $1,220.75 $0.59 $0.68 $0.68 $164.75 $845 $976.83 $976.83 $0.47 $0.54 $0.54 $131.83 100,000 $1,620 $1,872.75 $1,872.75 $1.62 $1.87 $1.87 $252.75 $1,350 $1,560.62 $1,560.62 $1.35 $1.56 $1.56 $210.62 $1,080 $1,248.50 $1,248.50 $1.08 $1.25 $1.25 $168.50 F-1 Manufacturing 2,000 $2,797 $3,233.38 $3,233.38 $4.62 $5.34 $5.34 $436.38 $2,331 $2,694.67 $2,694.67 $3.85 $4.45 $4.45 $363.67 $1,865 $2,155.97 $2,155.97 $3.08 $3.56 $3.56 $290.97 10,000 $3,167 $3,661.10 $3,661.10 $5.65 $6.53 $6.53 $494.10 $2,639 $3,050.73 $3,050.73 $4.71 $5.44 $5.44 $411.73 $2,111 $2,440.35 $2,440.35 $3.77 $4.36 $4.36 $329.35 Attachment
A

Page 380 of 445 ends

UBC
Class Occupancy Type
Project Size
Threshold
Current
Fee
Full Cost using
% change
needed
Suggested
Base Fee
Current Fee
for Each
Additional
100 s.f.

Full Cost
using %
change
needed
Suggested Fee
for Each
Additional 100
s.f.

Difference in
base fee
Current
Fee
Full Cost using
% change
needed
Suggested
Base Fee
Current Fee
for Each
Additional
100 s.f.

Full Cost
using ICC
per sq ft
Suggested Fee
for Each
Additional 100
s.f.

Difference in
base fee
Current
Fee
Full cost using
% change
needed
Suggested
Base Fee
Current Fee
for Each
Additional
100 s.f.

Full Cost
using ICC
per sq ft
Suggested Fee
for Each
Additional 100
s.f.

Difference in
base fee

CITY OF COVINA

CONSOLIDATED SCHEDULE OF NEW CONSTRUCTION FEES (P/C PROCESSING AND INSPECTION COMBINED) (All Construction Types)

NEW CONSTRUCTION
Types IA Types IB, IIA, IIIA, VA Types IIB, IIIB, IV, VB 20,000 $3,732 $4,314.25 $4,314.25 $3.16 $3.65 $3.65 $582.25 $3,110 $3,595.21 $3,595.21 $2.63 $3.04 $3.04 $485.21 $2,488 $2,876.17 $2,876.17 $2.10 $2.43 $2.43 $388.1740,000 $4,363 $5,043.70 $5,043.70 $1.23 $1.42 $1.42 $680.70 $3,636 $4,203.27 $4,203.27 $1.02 $1.18 $1.18 $567.27 $2,909 $3,362.85 $3,362.85 $0.82 $0.95 $0.95 $453.85 100,000 $5,100 $5,895.68 $5,895.68 $1.67 $1.93 $1.93 $795.68 $4,250 $4,913.07 $4,913.07 $1.39 $1.61 $1.61 $663.07 $3,400 $3,930.45 $3,930.45 $1.11 $1.28 $1.28 $530.45200,000 $6,768 $7,823.92 $7,823.92 $3.38 $3.91 $3.91 $1,055.92 $5,640 $6,519.93 $6,519.93 $2.82 $3.26 $3.26 $879.93 $4,512 $5,215.94 $5,215.94 $2.26 $2.61 $2.61 $703.94 F-1 Woodworking 500 $2,481 $2,868.08 $2,868.08 $16.01 $18.51 $18.51 $387.08 $2,068 $2,390.64 $2,390.64 $13.34 $15.42 $15.42 $322.64 $1,654 $1,912.05 $1,912.05 $10.68 $12.35 $12.35 $258.05 2,500 $2,802 $3,239.16 $3,239.16 $19.52 $22.57 $22.57 $437.16 $2,335 $2,699.30 $2,699.30 $16.26 $18.80 $18.80 $364.30 $1,868 $2,159.44 $2,159.44 $13.01 $15.04 $15.04 $291.445,000 $3,290 $3,803.29 $3,803.29 $10.98 $12.69 $12.69 $513.29 $2,741 $3,168.64 $3,168.64 $9.15 $10.58 $10.58 $427.64 $2,193 $2,535.14 $2,535.14 $7.32 $8.46 $8.46 $342.14 10,000 $3,839 $4,437.95 $4,437.95 $4.29 $4.96 $4.96 $598.95 $3,199 $3,698.10 $3,698.10 $3.57 $4.13 $4.13 $499.10 $2,559 $2,958.25 $2,958.25 $2.86 $3.31 $3.31 $399.2525,000 $4,481 $5,180.11 $5,180.11 $5.72 $6.61 $6.61 $699.11 $3,734 $4,316.56 $4,316.56 $4.76 $5.50 $5.50 $582.56 $2,988 $3,454.18 $3,454.18 $3.81 $4.40 $4.40 $466.1850,000 $5,910 $6,832.06 $6,832.06 $11.82 $13.66 $13.66 $922.06 $4,925 $5,693.38 $5,693.38 $9.85 $11.39 $11.39 $768.38 $3,940 $4,554.70 $4,554.70 $7.88 $9.11 $9.11 $614.70 F-2 Industrial / Manufacturing 2,000 $3,060 $3,537.41 $3,537.41 $5.08 $5.87 $5.87 $477.41 $2,550 $2,947.84 $2,947.84 $4.23 $4.89 $4.89 $397.84 $2,040 $2,358.27 $2,358.27 $3.39 $3.92 $3.92 $318.27 10,000 $3,467 $4,007.91 $4,007.91 $6.20 $7.17 $7.17 $540.91 $2,889 $3,339.73 $3,339.73 $5.17 $5.98 $5.98 $450.73 $2,311 $2,671.55 $2,671.55 $4.14 $4.79 $4.79 $360.5520,000 $4,087 $4,724.64 $4,724.64 $3.49 $4.03 $4.03 $637.64 $3,406 $3,937.39 $3,937.39 $2.91 $3.36 $3.36 $531.39 $2,725 $3,150.14 $3,150.14 $2.33 $2.69 $2.69 $425.1440,000 $4,786 $5,532.69 $5,532.69 $1.34 $1.55 $1.55 $746.69 $3,988 $4,610.19 $4,610.19 $1.12 $1.29 $1.29 $622.19 $3,190 $3,687.69 $3,687.69 $0.90 $1.04 $1.04 $497.69 100,000 $5,592 $6,464.44 $6,464.44 $1.82 $2.10 $2.10 $872.44 $4,660 $5,387.04 $5,387.04 $1.52 $1.76 $1.76 $727.04 $3,728 $4,309.63 $4,309.63 $1.22 $1.41 $1.41 $581.63200,000 $7,416 $8,573.02 $8,573.02 $3.71 $4.29 $4.29 $1,157.02 $6,180 $7,144.18 $7,144.18 $3.09 $3.57 $3.57 $964.18 $4,944 $5,715.34 $5,715.34 $2.47 $2.86 $2.86 $771.34 H-2 Moderate Explosion Hazards 200 $2,214 $2,559.42 $2,559.42 $36.03 $41.65 $41.65 $345.42 $1,845 $2,132.85 $2,132.85 $30.03 $34.72 $34.72 $287.85 $1,476 $1,706.28 $1,706.28 $24.02 $27.77 $27.77 $230.28 1,000 $2,502 $2,892.35 $2,892.35 $43.93 $50.78 $50.78 $390.35 $2,085 $2,410.29 $2,410.29 $36.61 $42.32 $42.32 $325.29 $1,668 $1,928.23 $1,928.23 $29.29 $33.86 $33.86 $260.232,000 $2,941 $3,399.84 $3,399.84 $24.72 $28.58 $28.58 $458.84 $2,451 $2,833.40 $2,833.40 $20.60 $23.81 $23.81 $382.40 $1,961 $2,266.95 $2,266.95 $16.48 $19.05 $19.05 $305.954,000 $3,436 $3,972.07 $3,972.07 $9.60 $11.10 $11.10 $536.07 $2,863 $3,309.67 $3,309.67 $8.00 $9.25 $9.25 $446.67 $2,291 $2,648.43 $2,648.43 $6.40 $7.40 $7.40 $357.43 10,000 $4,012 $4,637.94 $4,637.94 $12.90 $14.91 $14.91 $625.94 $3,343 $3,864.56 $3,864.56 $10.75 $12.43 $12.43 $521.56 $2,674 $3,091.19 $3,091.19 $8.60 $9.94 $9.94 $417.1920,000 $5,302 $6,129.20 $6,129.20 $26.51 $30.65 $30.65 $827.20 $4,418 $5,107.28 $5,107.28 $22.09 $25.54 $25.54 $689.28 $3,534 $4,085.36 $4,085.36 $17.67 $20.43 $20.43 $551.36 H-4 Repair Garage 1,000 $2,385 $2,757.10 $2,757.10 $7.80 $9.02 $9.02 $372.10 $1,988 $2,298.16 $2,298.16 $6.50 $7.51 $7.51 $310.16 $1,590 $1,838.07 $1,838.07 $5.20 $6.01 $6.01 $248.07 5,000 $2,698 $3,118.93 $3,118.93 $9.53 $11.02 $11.02 $420.93 $2,248 $2,598.72 $2,598.72 $7.94 $9.18 $9.18 $350.72 $1,798 $2,078.52 $2,078.52 $6.35 $7.34 $7.34 $280.52 10,000 $3,174 $3,669.20 $3,669.20 $5.34 $6.17 $6.17 $495.20 $2,645 $3,057.66 $3,057.66 $4.45 $5.14 $5.14 $412.66 $2,116 $2,446.13 $2,446.13 $3.56 $4.12 $4.12 $330.1320,000 $3,708 $4,286.51 $4,286.51 $2.08 $2.40 $2.40 $578.51 $3,090 $3,572.09 $3,572.09 $1.73 $2.00 $2.00 $482.09 $2,472 $2,857.67 $2,857.67 $1.39 $1.61 $1.61 $385.6750,000 $4,332 $5,007.86 $5,007.86 $2.81 $3.25 $3.25 $675.86 $3,610 $4,173.22 $4,173.22 $2.34 $2.71 $2.71 $563.22 $2,888 $3,338.57 $3,338.57 $1.87 $2.16 $2.16 $450.57 100,000 $5,736 $6,630.91 $6,630.91 $5.74 $6.64 $6.64 $894.91 $4,780 $5,525.76 $5,525.76 $4.78 $5.53 $5.53 $745.76 $3,824 $4,420.61 $4,420.61 $3.82 $4.42 $4.42 $596.61 I-1.1 Nursery - Full-Time (5+) 200 $2,267 $2,620.69 $2,620.69 $36.29 $41.95 $41.95 $353.69 $1,889 $2,183.71 $2,183.71 $30.24 $34.96 $34.96 $294.71 $1,511 $1,746.74 $1,746.74 $24.19 $27.96 $27.96 $235.74 1,000 $2,557 $2,955.93 $2,955.93 $44.22 $51.12 $51.12 $398.93 $2,131 $2,463.47 $2,463.47 $36.85 $42.60 $42.60 $332.47 $1,705 $1,971.01 $1,971.01 $29.48 $34.08 $34.08 $266.012,000 $2,999 $3,466.89 $3,466.89 $24.87 $28.75 $28.75 $467.89 $2,500 $2,890.04 $2,890.04 $20.73 $23.96 $23.96 $390.04 $2,000 $2,312.03 $2,312.03 $16.58 $19.17 $19.17 $312.034,000 $3,497 $4,042.59 $4,042.59 $9.67 $11.18 $11.18 $545.59 $2,914 $3,368.63 $3,368.63 $8.06 $9.32 $9.32 $454.63 $2,331 $2,694.67 $2,694.67 $6.45 $7.46 $7.46 $363.67 10,000 $4,077 $4,713.08 $4,713.08 $12.99 $15.02 $15.02 $636.08 $3,398 $3,928.14 $3,928.14 $10.83 $12.52 $12.52 $530.14 $2,718 $3,142.05 $3,142.05 $8.66 $10.01 $10.01 $424.0520,000 $5,376 $6,214.74 $6,214.74 $26.88 $31.07 $31.07 $838.74 $4,480 $5,178.95 $5,178.95 $22.40 $25.89 $25.89 $698.95 $3,584 $4,143.16 $4,143.16 $17.92 $20.72 $20.72 $559.16 I-1.2 Health Care Centers 1,000 $3,411 $3,943.17 $3,943.17 $11.25 $13.01 $13.01 $532.17 $2,842 $3,285.40 $3,285.40 $9.38 $10.84 $10.84 $443.40 $2,274 $2,628.78 $2,628.78 $7.50 $8.67 $8.67 $354.78 5,000 $3,861 $4,463.38 $4,463.38 $13.74 $15.88 $15.88 $602.38 $3,218 $3,720.06 $3,720.06 $11.45 $13.24 $13.24 $502.06 $2,574 $2,975.59 $2,975.59 $9.16 $10.59 $10.59 $401.59 10,000 $4,548 $5,257.56 $5,257.56 $7.71 $8.91 $8.91 $709.56 $3,790 $4,381.30 $4,381.30 $6.43 $7.43 $7.43 $591.30 $3,032 $3,505.04 $3,505.04 $5.14 $5.94 $5.94 $473.0420,000 $5,319 $6,148.85 $6,148.85 $3.00 $3.47 $3.47 $829.85 $4,433 $5,124.62 $5,124.62 $2.50 $2.89 $2.89 $691.62 $3,546 $4,099.23 $4,099.23 $2.00 $2.31 $2.31 $553.2350,000 $6,218 $7,188.11 $7,188.11 $4.04 $4.67 $4.67 $970.11 $5,181 $5,989.32 $5,989.32 $3.36 $3.88 $3.88 $808.32 $4,145 $4,791.69 $4,791.69 $2.69 $3.11 $3.11 $646.69 100,000 $8,235 $9,519.79 $9,519.79 $8.24 $9.53 $9.53 $1,284.79 $6,863 $7,933.74 $7,933.74 $6.86 $7.93 $7.93 $1,070.74 $5,490 $6,346.53 $6,346.53 $5.49 $6.35 $6.35 $856.53 I-2 Nursing Home / Assisted Living 1,000 $3,482 $4,025.25 $4,025.25 $11.51 $13.31 $13.31 $543.25 $2,902 $3,354.76 $3,354.76 $9.59 $11.09 $11.09 $452.76 $2,322 $2,684.27 $2,684.27 $7.67 $8.87 $8.87 $362.27 5,000 $3,943 $4,558.17 $4,558.17 $14.03 $16.22 $16.22 $615.17 $3,286 $3,798.67 $3,798.67 $11.69 $13.51 $13.51 $512.67 $2,629 $3,039.17 $3,039.17 $9.35 $10.81 $10.81 $410.17 10,000 $4,644 $5,368.54 $5,368.54 $7.89 $9.12 $9.12 $724.54 $3,870 $4,473.78 $4,473.78 $6.58 $7.61 $7.61 $603.78 $3,096 $3,579.03 $3,579.03 $5.26 $6.08 $6.08 $483.0320,000 $5,433 $6,280.64 $6,280.64 $3.07 $3.55 $3.55 $847.64 $4,528 $5,234.44 $5,234.44 $2.55 $2.95 $2.95 $706.44 $3,622 $4,187.09 $4,187.09 $2.04 $2.36 $2.36 $565.0950,000 $6,353 $7,344.17 $7,344.17 $4.13 $4.77 $4.77 $991.17 $5,294 $6,119.95 $6,119.95 $3.44 $3.98 $3.98 $825.95 $4,235 $4,895.73 $4,895.73 $2.75 $3.18 $3.18 $660.73 100,000 $8,415 $9,727.88 $9,727.88 $8.42 $9.73 $9.73 $1,312.88 $7,013 $8,107.14 $8,107.14 $7.01 $8.10 $8.10 $1,094.14 $5,610 $6,485.25 $6,485.25 $5.61 $6.49 $6.49 $875.25 M Department Stores 1,000 $2,202 $2,545.55 $2,545.55 $7.17 $8.29 $8.29 $343.55 $1,835 $2,121.29 $2,121.29 $5.98 $6.91 $6.91 $286.29 $1,468 $1,697.03 $1,697.03 $4.78 $5.53 $5.53 $229.03 5,000 $2,489 $2,877.32 $2,877.32 $8.72 $10.08 $10.08 $388.32 $2,075 $2,398.73 $2,398.73 $7.27 $8.40 $8.40 $323.73 $1,660 $1,918.99 $1,918.99 $5.82 $6.73 $6.73 $258.99 10,000 $2,926 $3,382.50 $3,382.50 $4.92 $5.69 $5.69 $456.50 $2,438 $2,818.37 $2,818.37 $4.10 $4.74 $4.74 $380.37 $1,950 $2,254.23 $2,254.23 $3.28 $3.79 $3.79 $304.2320,000 $3,418 $3,951.26 $3,951.26 $1.91 $2.21 $2.21 $533.26 $2,848 $3,292.33 $3,292.33 $1.59 $1.84 $1.84 $444.33 $2,278 $2,633.40 $2,633.40 $1.27 $1.47 $1.47 $355.4050,000 $3,990 $4,612.50 $4,612.50 $2.56 $2.96 $2.96 $622.50 $3,325 $3,843.75 $3,843.75 $2.13 $2.46 $2.46 $518.75 $2,660 $3,075.00 $3,075.00 $1.70 $1.97 $1.97 $415.00 100,000 $5,268 $6,089.89 $6,089.89 $5.27 $6.09 $6.09 $821.89 $4,390 $5,074.91 $5,074.91 $4.39 $5.07 $5.07 $684.91 $3,512 $4,059.93 $4,059.93 $3.51 $4.06 $4.06 $547.93 M Shopping centers, Markets (Retail) 1,000 $2,608 $3,014.89 $3,014.89 $8.68 $10.03 $10.03 $406.89 $2,173 $2,512.02 $2,512.02 $7.23 $8.36 $8.36 $339.02 $1,738 $2,009.16 $2,009.16 $5.78 $6.68 $6.68 $271.16 5,000 $2,955 $3,416.03 $3,416.03 $10.57 $12.22 $12.22 $461.03 $2,462 $2,846.11 $2,846.11 $8.81 $10.18 $10.18 $384.11 $1,970 $2,277.35 $2,277.35 $7.05 $8.15 $8.15 $307.35 10,000 $3,483 $4,026.40 $4,026.40 $5.95 $6.88 $6.88 $543.40 $2,902 $3,354.76 $3,354.76 $4.96 $5.73 $5.73 $452.76 $2,322 $2,684.27 $2,684.27 $3.97 $4.59 $4.59 $362.2720,000 $4,078 $4,714.23 $4,714.23 $2.31 $2.67 $2.67 $636.23 $3,398 $3,928.14 $3,928.14 $1.92 $2.22 $2.22 $530.14 $2,719 $3,143.21 $3,143.21 $1.54 $1.78 $1.78 $424.2150,000 $4,770 $5,514.20 $5,514.20 $3.12 $3.61 $3.61 $744.20 $3,975 $4,595.16 $4,595.16 $2.60 $3.01 $3.01 $620.16 $3,180 $3,676.13 $3,676.13 $2.08 $2.40 $2.40 $496.13 100,000 $6,330 $7,317.58 $7,317.58 $6.33 $7.32 $7.32 $987.58 $5,275 $6,097.99 $6,097.99 $5.27 $6.09 $6.09 $822.99 $4,220 $4,878.39 $4,878.39 $4.22 $4.88 $4.88 $658.39 R-1 Apartment Buildings 1,000 $3,358 $3,881.90 $3,881.90 $11.21 $12.96 $12.96 $523.90 $2,798 $3,234.53 $3,234.53 $9.35 $10.81 $10.81 $436.53 $2,239 $2,588.32 $2,588.32 $7.48 $8.65 $8.65 $349.32 5,000 $3,806 $4,399.80 $4,399.80 $13.66 $15.79 $15.79 $593.80 $3,172 $3,666.88 $3,666.88 $11.38 $13.16 $13.16 $494.88 $2,538 $2,933.97 $2,933.97 $9.10 $10.52 $10.52 $395.97 10,000 $4,489 $5,189.36 $5,189.36 $7.69 $8.89 $8.89 $700.36 $3,741 $4,324.66 $4,324.66 $6.41 $7.41 $7.41 $583.66 $2,993 $3,459.96 $3,459.96 $5.13 $5.93 $5.93 $466.9620,000 $5,258 $6,078.33 $6,078.33 $2.99 $3.46 $3.46 $820.33 $4,382 $5,065.66 $5,065.66 $2.49 $2.88 $2.88 $683.66 $3,506 $4,052.99 $4,052.99 $1.99 $2.30 $2.30 $546.9950,000 $6,156 $7,116.44 $7,116.44 $4.01 $4.64 $4.64 $960.44 $5,130 $5,930.36 $5,930.36 $3.34 $3.86 $3.86 $800.36 $4,104 $4,744.29 $4,744.29 $2.67 $3.09 $3.09 $640.29 100,000 $8,160 $9,433.09 $9,433.09 $8.16 $9.43 $9.43 $1,273.09 $6,800 $7,860.91 $7,860.91 $6.80 $7.86 $7.86 $1,060.91 $5,440 $6,288.73 $6,288.73 $5.44 $6.29 $6.29 $848.73 R-1 Hotels & Motels 1,000 $3,358 $3,881.90 $3,881.90 $11.21 $12.96 $12.96 $523.90 $2,798 $3,234.53 $3,234.53 $9.35 $10.81 $10.81 $436.53 $2,239 $2,588.32 $2,588.32 $7.48 $8.65 $8.65 $349.32 5,000 $3,806 $4,399.80 $4,399.80 $13.66 $15.79 $15.79 $593.80 $3,172 $3,666.88 $3,666.88 $11.38 $13.16 $13.16 $494.88 $2,538 $2,933.97 $2,933.97 $9.10 $10.52 $10.52 $395.97 10,000 $4,489 $5,189.36 $5,189.36 $7.69 $8.89 $8.89 $700.36 $3,741 $4,324.66 $4,324.66 $6.41 $7.41 $7.41 $583.66 $2,993 $3,459.96 $3,459.96 $5.13 $5.93 $5.93 $466.9620,000 $5,258 $6,078.33 $6,078.33 $2.99 $3.46 $3.46 $820.33 $4,382 $5,065.66 $5,065.66 $2.49 $2.88 $2.88 $683.66 $3,506 $4,052.99 $4,052.99 $1.99 $2.30 $2.30 $546.9950,000 $6,156 $7,116.44 $7,116.44 $4.01 $4.64 $4.64 $960.44 $5,130 $5,930.36 $5,930.36 $3.34 $3.86 $3.86 $800.36 $4,104 $4,744.29 $4,744.29 $2.67 $3.09 $3.09 $640.29 100,000 $8,160 $9,433.09 $9,433.09 $8.16 $9.43 $9.43 $1,273.09 $6,800 $7,860.91 $7,860.91 $6.80 $7.86 $7.86 $1,060.91 $5,440 $6,288.73 $6,288.73 $5.44 $6.29 $6.29 $848.73 R-1 Hotels & Motels - Phased Permits 1,000 $2,134 $2,466.94 $2,466.94 $6.92 $8.00 $8.00 $332.94 $1,778 $2,055.40 $2,055.40 $5.77 $6.67 $6.67 $277.40 $1,423 $1,645.01 $1,645.01 $4.62 $5.34 $5.34 $222.01 5,000 $2,411 $2,787.15 $2,787.15 $8.45 $9.77 $9.77 $376.15 $2,009 $2,322.44 $2,322.44 $7.04 $8.14 $8.14 $313.44 $1,607 $1,857.72 $1,857.72 $5.63 $6.51 $6.51 $250.72 10,000 $2,833 $3,274.99 $3,274.99 $4.74 $5.48 $5.48 $441.99 $2,361 $2,729.35 $2,729.35 $3.95 $4.57 $4.57 $368.35 $1,889 $2,183.71 $2,183.71 $3.16 $3.65 $3.65 $294.71 Attachment
A

Page 381 of 445 ends

UBC
Class Occupancy Type
Project Size
Threshold
Current
Fee
Full Cost using
% change
needed
Suggested
Base Fee
Current Fee
for Each
Additional
100 s.f.

Full Cost
using %
change
needed
Suggested Fee
for Each
Additional 100
s.f.

Difference in
base fee
Current
Fee
Full Cost using
% change
needed
Suggested
Base Fee
Current Fee
for Each
Additional
100 s.f.

Full Cost
using ICC
per sq ft
Suggested Fee
for Each
Additional 100
s.f.

Difference in
base fee
Current
Fee
Full cost using
% change
needed
Suggested
Base Fee
Current Fee
for Each
Additional
100 s.f.

Full Cost
using ICC
per sq ft
Suggested Fee
for Each
Additional 100
s.f.

Difference in
base fee

CITY OF COVINA

CONSOLIDATED SCHEDULE OF NEW CONSTRUCTION FEES (P/C PROCESSING AND INSPECTION COMBINED) (All Construction Types)

NEW CONSTRUCTION
Types IA Types IB, IIA, IIIA, VA Types IIB, IIIB, IV, VB 20,000 $3,307 $3,822.95 $3,822.95 $1.86 $2.15 $2.15 $515.95 $2,756 $3,185.98 $3,185.98 $1.55 $1.79 $1.79 $429.98 $2,205 $2,549.02 $2,549.02 $1.24 $1.43 $1.43 $344.0250,000 $3,864 $4,466.85 $4,466.85 $2.47 $2.86 $2.86 $602.85 $3,220 $3,722.37 $3,722.37 $2.06 $2.38 $2.38 $502.37 $2,576 $2,977.90 $2,977.90 $1.65 $1.91 $1.91 $401.90 100,000 $5,100 $5,895.68 $5,895.68 $5.10 $5.90 $5.90 $795.68 $4,250 $4,913.07 $4,913.07 $4.25 $4.91 $4.91 $663.07 $3,400 $3,930.45 $3,930.45 $3.40 $3.93 $3.93 $530.45 R - 2.1 Group Care, Non-Amb. (6+) 250 $2,397 $2,770.97 $2,770.97 $31.39 $36.29 $36.29 $373.97 $1,997 $2,308.56 $2,308.56 $26.16 $30.24 $30.24 $311.56 $1,598 $1,847.31 $1,847.31 $20.93 $24.20 $24.20 $249.31 1,250 $2,711 $3,133.96 $3,133.96 $38.26 $44.23 $44.23 $422.96 $2,259 $2,611.44 $2,611.44 $31.88 $36.85 $36.85 $352.44 $1,807 $2,088.92 $2,088.92 $25.50 $29.48 $29.48 $281.922,500 $3,189 $3,686.54 $3,686.54 $21.53 $24.89 $24.89 $497.54 $2,658 $3,072.69 $3,072.69 $17.94 $20.74 $20.74 $414.69 $2,126 $2,457.69 $2,457.69 $14.35 $16.59 $16.59 $331.695,000 $3,727 $4,308.47 $4,308.47 $8.36 $9.66 $9.66 $581.47 $3,106 $3,590.59 $3,590.59 $6.97 $8.06 $8.06 $484.59 $2,485 $2,872.70 $2,872.70 $5.58 $6.45 $6.45 $387.70 12,500 $4,355 $5,034.45 $5,034.45 $11.24 $12.99 $12.99 $679.45 $3,629 $4,195.18 $4,195.18 $9.37 $10.83 $10.83 $566.18 $2,903 $3,355.91 $3,355.91 $7.50 $8.67 $8.67 $452.9125,000 $5,760 $6,658.65 $6,658.65 $23.04 $26.63 $26.63 $898.65 $4,800 $5,548.88 $5,548.88 $19.20 $22.20 $22.20 $748.88 $3,840 $4,439.10 $4,439.10 $15.36 $17.76 $17.76 $599.10 R-2.1.1 Group Care, Non-Amb. (1-5) 300 $2,839 $3,281.93 $3,281.93 $30.86 $35.67 $35.67 $442.93 $2,366 $2,735.13 $2,735.13 $25.72 $29.73 $29.73 $369.13 $1,893 $2,188.34 $2,188.34 $20.57 $23.78 $23.78 $295.34 1,500 $3,209 $3,709.66 $3,709.66 $37.64 $43.51 $43.51 $500.66 $2,674 $3,091.19 $3,091.19 $31.36 $36.25 $36.25 $417.19 $2,139 $2,472.72 $2,472.72 $25.09 $29.00 $29.00 $333.723,000 $3,774 $4,362.80 $4,362.80 $21.15 $24.45 $24.45 $588.80 $3,145 $3,635.67 $3,635.67 $17.63 $20.38 $20.38 $490.67 $2,516 $2,908.54 $2,908.54 $14.10 $16.30 $16.30 $392.546,000 $4,408 $5,095.72 $5,095.72 $8.22 $9.50 $9.50 $687.72 $3,674 $4,247.20 $4,247.20 $6.85 $7.92 $7.92 $573.20 $2,939 $3,397.53 $3,397.53 $5.48 $6.33 $6.33 $458.53 15,000 $5,148 $5,951.17 $5,951.17 $11.07 $12.80 $12.80 $803.17 $4,290 $4,959.31 $4,959.31 $9.22 $10.66 $10.66 $669.31 $3,432 $3,967.45 $3,967.45 $7.38 $8.53 $8.53 $535.4530,000 $6,809 $7,871.31 $7,871.31 $22.70 $26.24 $26.24 $1,062.31 $5,674 $6,559.24 $6,559.24 $18.91 $21.86 $21.86 $885.24 $4,539 $5,247.16 $5,247.16 $15.13 $17.49 $17.49 $708.16 R-2.2 Group Care, Ambulatory (6+) 250 $2,397 $2,770.97 $2,770.97 $31.39 $36.29 $36.29 $373.97 $1,997 $2,308.56 $2,308.56 $26.16 $30.24 $30.24 $311.56 $1,598 $1,847.31 $1,847.31 $20.93 $24.20 $24.20 $249.31 1,250 $2,711 $3,133.96 $3,133.96 $38.26 $44.23 $44.23 $422.96 $2,259 $2,611.44 $2,611.44 $31.88 $36.85 $36.85 $352.44 $1,807 $2,088.92 $2,088.92 $25.50 $29.48 $29.48 $281.922,500 $3,189 $3,686.54 $3,686.54 $21.53 $24.89 $24.89 $497.54 $2,658 $3,072.69 $3,072.69 $17.94 $20.74 $20.74 $414.69 $2,126 $2,457.69 $2,457.69 $14.35 $16.59 $16.59 $331.695,000 $3,727 $4,308.47 $4,308.47 $8.36 $9.66 $9.66 $581.47 $3,106 $3,590.59 $3,590.59 $6.97 $8.06 $8.06 $484.59 $2,485 $2,872.70 $2,872.70 $5.58 $6.45 $6.45 $387.70 12,500 $4,355 $5,034.45 $5,034.45 $11.24 $12.99 $12.99 $679.45 $3,629 $4,195.18 $4,195.18 $9.37 $10.83 $10.83 $566.18 $2,903 $3,355.91 $3,355.91 $7.50 $8.67 $8.67 $452.9125,000 $5,760 $6,658.65 $6,658.65 $23.04 $26.63 $26.63 $898.65 $4,800 $5,548.88 $5,548.88 $19.20 $22.20 $22.20 $748.88 $3,840 $4,439.10 $4,439.10 $15.36 $17.76 $17.76 $599.10 R-2.2.1 Group Care, Non-Amb. (1-5) 300 $2,839 $3,281.93 $3,281.93 $30.86 $35.67 $35.67 $442.93 $2,366 $2,735.13 $2,735.13 $25.72 $29.73 $29.73 $369.13 $1,893 $2,188.34 $2,188.34 $20.57 $23.78 $23.78 $295.34 1,500 $3,209 $3,709.66 $3,709.66 $37.64 $43.51 $43.51 $500.66 $2,674 $3,091.19 $3,091.19 $31.36 $36.25 $36.25 $417.19 $2,139 $2,472.72 $2,472.72 $25.09 $29.00 $29.00 $333.723,000 $3,774 $4,362.80 $4,362.80 $21.15 $24.45 $24.45 $588.80 $3,145 $3,635.67 $3,635.67 $17.63 $20.38 $20.38 $490.67 $2,516 $2,908.54 $2,908.54 $14.10 $16.30 $16.30 $392.546,000 $4,408 $5,095.72 $5,095.72 $8.22 $9.50 $9.50 $687.72 $3,674 $4,247.20 $4,247.20 $6.85 $7.92 $7.92 $573.20 $2,939 $3,397.53 $3,397.53 $5.48 $6.33 $6.33 $458.53 15,000 $5,148 $5,951.17 $5,951.17 $11.07 $12.80 $12.80 $803.17 $4,290 $4,959.31 $4,959.31 $9.22 $10.66 $10.66 $669.31 $3,432 $3,967.45 $3,967.45 $7.38 $8.53 $8.53 $535.4530,000 $6,809 $7,871.31 $7,871.31 $22.70 $26.24 $26.24 $1,062.31 $5,674 $6,559.24 $6,559.24 $18.91 $21.86 $21.86 $885.24 $4,539 $5,247.16 $5,247.16 $15.13 $17.49 $17.49 $708.16 R-3 Dwellings - Custom, Models, 1,000 $2,806 $3,243.78 $3,243.78 $13.56 $15.68 $15.68 $437.78 $2,338 $2,702.77 $2,702.77 $11.30 $13.06 $13.06 $364.77 $1,871 $2,162.91 $2,162.91 $9.04 $10.45 $10.45 $291.91 2,000 $2,942 $3,401.00 $3,401.00 $19.37 $22.39 $22.39 $459.00 $2,451 $2,833.40 $2,833.40 $16.14 $18.66 $18.66 $382.40 $1,961 $2,266.95 $2,266.95 $12.91 $14.92 $14.92 $305.953,000 $3,135 $3,624.11 $3,624.11 $54.17 $62.62 $62.62 $489.11 $2,613 $3,020.67 $3,020.67 $45.14 $52.18 $52.18 $407.67 $2,090 $2,416.07 $2,416.07 $36.11 $41.74 $41.74 $326.074,000 $3,677 $4,250.67 $4,250.67 $30.95 $35.78 $35.78 $573.67 $3,064 $3,542.03 $3,542.03 $25.79 $29.81 $29.81 $478.03 $2,451 $2,833.40 $2,833.40 $20.63 $23.85 $23.85 $382.405,000 $3,986 $4,607.88 $4,607.88 $16.25 $18.79 $18.79 $621.88 $3,322 $3,840.29 $3,840.29 $13.54 $15.65 $15.65 $518.29 $2,658 $3,072.69 $3,072.69 $10.83 $12.52 $12.52 $414.69 10,000 $4,799 $5,547.72 $5,547.72 $47.99 $55.48 $55.48 $748.72 $3,999 $4,622.91 $4,622.91 $39.99 $46.23 $46.23 $623.91 $3,199 $3,698.10 $3,698.10 $31.99 $36.98 $36.98 $499.10 R-3 Dwellings - Production Phase 1,000 $1,779 $2,056.55 $2,056.55 $22.74 $26.29 $26.29 $277.55 $1,483 $1,714.37 $1,714.37 $18.95 $21.91 $21.91 $231.37 $1,186 $1,371.04 $1,371.04 $15.16 $17.53 $17.53 $185.04 2,000 $2,007 $2,320.12 $2,320.12 $34.67 $40.08 $40.08 $313.12 $1,672 $1,932.86 $1,932.86 $28.89 $33.40 $33.40 $260.86 $1,338 $1,546.75 $1,546.75 $23.11 $26.72 $26.72 $208.753,000 $2,353 $2,720.11 $2,720.11 $38.99 $45.07 $45.07 $367.11 $1,961 $2,266.95 $2,266.95 $32.49 $37.56 $37.56 $305.95 $1,569 $1,813.79 $1,813.79 $25.99 $30.04 $30.04 $244.794,000 $2,743 $3,170.95 $3,170.95 $45.48 $52.58 $52.58 $427.95 $2,286 $2,642.65 $2,642.65 $37.90 $43.81 $43.81 $356.65 $1,829 $2,114.35 $2,114.35 $30.32 $35.05 $35.05 $285.355,000 $3,198 $3,696.94 $3,696.94 $20.35 $23.52 $23.52 $498.94 $2,665 $3,080.78 $3,080.78 $16.96 $19.61 $19.61 $415.78 $2,132 $2,464.63 $2,464.63 $13.57 $15.69 $15.69 $332.63 10,000 $4,216 $4,873.76 $4,873.76 $42.16 $48.74 $48.74 $657.76 $3,513 $4,061.08 $4,061.08 $35.13 $40.61 $40.61 $548.08 $2,810 $3,248.41 $3,248.41 $28.10 $32.48 $32.48 $438.41 R-3 Dwellings - Alternate Materials 1,000 $2,245 $2,595.26 $2,595.26 $10.85 $12.54 $12.54 $350.26 $1,871 $2,162.91 $2,162.91 $9.04 $10.45 $10.45 $291.91 $1,496 $1,729.40 $1,729.40 $7.23 $8.36 $8.36 $233.40 2,000 $2,353 $2,720.11 $2,720.11 $15.49 $17.91 $17.91 $367.11 $1,961 $2,266.95 $2,266.95 $12.91 $14.92 $14.92 $305.95 $1,569 $1,813.79 $1,813.79 $10.33 $11.94 $11.94 $244.793,000 $2,508 $2,899.29 $2,899.29 $51.06 $59.03 $59.03 $391.29 $2,090 $2,416.07 $2,416.07 $42.55 $49.19 $49.19 $326.07 $1,672 $1,932.86 $1,932.86 $34.04 $39.35 $39.35 $260.864,000 $3,019 $3,490.01 $3,490.01 $24.77 $28.63 $28.63 $471.01 $2,516 $2,908.54 $2,908.54 $20.64 $23.86 $23.86 $392.54 $2,012 $2,325.90 $2,325.90 $16.51 $19.09 $19.09 $313.905,000 $3,266 $3,775.55 $3,775.55 $14.54 $16.81 $16.81 $509.55 $2,722 $3,146.68 $3,146.68 $12.12 $14.01 $14.01 $424.68 $2,178 $2,517.80 $2,517.80 $9.70 $11.21 $11.21 $339.80 10,000 $3,994 $4,617.13 $4,617.13 $39.94 $46.17 $46.17 $623.13 $3,328 $3,847.22 $3,847.22 $33.28 $38.47 $38.47 $519.22 $2,662 $3,077.31 $3,077.31 $26.62 $30.77 $30.77 $415.31 R-3 Manufactured Housing 1,000 $500 $578.01 $578.01 $1.76 $2.03 $2.03 $78.01 $417 $482.06 $482.06 $1.47 $1.70 $1.70 $65.06 $334 $386.11 $386.11 $1.17 $1.35 $1.35 $52.11 5,000 $571 $660.09 $660.09 $2.15 $2.49 $2.49 $89.09 $476 $550.26 $550.26 $1.79 $2.07 $2.07 $74.26 $381 $440.44 $440.44 $1.43 $1.65 $1.65 $59.44 10,000 $678 $783.78 $783.78 $1.20 $1.39 $1.39 $105.78 $565 $653.15 $653.15 $1.00 $1.16 $1.16 $88.15 $452 $522.52 $522.52 $0.80 $0.92 $0.92 $70.5220,000 $798 $922.50 $922.50 $0.47 $0.54 $0.54 $124.50 $665 $768.75 $768.75 $0.39 $0.45 $0.45 $103.75 $532 $615.00 $615.00 $0.31 $0.36 $0.36 $83.0050,000 $938 $1,084.34 $1,084.34 $0.62 $0.72 $0.72 $146.34 $781 $902.85 $902.85 $0.51 $0.59 $0.59 $121.85 $625 $722.51 $722.51 $0.41 $0.47 $0.47 $97.51 100,000 $1,245 $1,439.24 $1,439.24 $1.25 $1.45 $1.45 $194.24 $1,038 $1,199.94 $1,199.94 $1.04 $1.20 $1.20 $161.94 $830 $959.49 $959.49 $0.83 $0.96 $0.96 $129.49 S-1 Mini Storage 1,000 $1,814 $2,097.01 $2,097.01 $5.81 $6.72 $6.72 $283.01 $1,511 $1,746.74 $1,746.74 $4.84 $5.60 $5.60 $235.74 $1,209 $1,397.62 $1,397.62 $3.87 $4.47 $4.47 $188.62 5,000 $2,046 $2,365.21 $2,365.21 $7.08 $8.18 $8.18 $319.21 $1,705 $1,971.01 $1,971.01 $5.90 $6.82 $6.82 $266.01 $1,364 $1,576.81 $1,576.81 $4.72 $5.46 $5.46 $212.81 10,000 $2,400 $2,774.44 $2,774.44 $3.98 $4.60 $4.60 $374.44 $2,000 $2,312.03 $2,312.03 $3.32 $3.84 $3.84 $312.03 $1,600 $1,849.63 $1,849.63 $2.66 $3.08 $3.08 $249.6320,000 $2,798 $3,234.53 $3,234.53 $1.55 $1.79 $1.79 $436.53 $2,332 $2,695.83 $2,695.83 $1.29 $1.49 $1.49 $363.83 $1,866 $2,157.13 $2,157.13 $1.03 $1.19 $1.19 $291.1350,000 $3,264 $3,773.24 $3,773.24 $2.06 $2.38 $2.38 $509.24 $2,720 $3,144.36 $3,144.36 $1.72 $1.99 $1.99 $424.36 $2,176 $2,515.49 $2,515.49 $1.38 $1.60 $1.60 $339.49 100,000 $4,296 $4,966.25 $4,966.25 $4.30 $4.97 $4.97 $670.25 $3,580 $4,138.54 $4,138.54 $3.58 $4.14 $4.14 $558.54 $2,864 $3,310.83 $3,310.83 $2.86 $3.31 $3.31 $446.83 S-1 Moderate Hazard Storage 1,000 $2,443 $2,824.15 $2,824.15 $8.01 $9.26 $9.26 $381.15 $2,036 $2,353.65 $2,353.65 $6.67 $7.71 $7.71 $317.65 $1,628 $1,881.99 $1,881.99 $5.34 $6.17 $6.17 $253.99 5,000 $2,763 $3,194.07 $3,194.07 $9.76 $11.28 $11.28 $431.07 $2,303 $2,662.31 $2,662.31 $8.13 $9.40 $9.40 $359.31 $1,842 $2,129.38 $2,129.38 $6.50 $7.51 $7.51 $287.38 10,000 $3,251 $3,758.21 $3,758.21 $5.48 $6.33 $6.33 $507.21 $2,709 $3,131.65 $3,131.65 $4.57 $5.28 $5.28 $422.65 $2,167 $2,505.09 $2,505.09 $3.66 $4.23 $4.23 $338.0920,000 $3,799 $4,391.71 $4,391.71 $2.14 $2.47 $2.47 $592.71 $3,166 $3,659.95 $3,659.95 $1.78 $2.06 $2.06 $493.95 $2,533 $2,928.19 $2,928.19 $1.42 $1.64 $1.64 $395.1950,000 $4,440 $5,132.71 $5,132.71 $2.88 $3.33 $3.33 $692.71 $3,700 $4,277.26 $4,277.26 $2.40 $2.77 $2.77 $577.26 $2,960 $3,421.81 $3,421.81 $1.92 $2.22 $2.22 $461.81 100,000 $5,880 $6,797.37 $6,797.37 $5.88 $6.80 $6.80 $917.37 $4,900 $5,664.48 $5,664.48 $4.90 $5.66 $5.66 $764.48 $3,920 $4,531.58 $4,531.58 $3.92 $4.53 $4.53 $611.58 S-2 Warehouse 5,000 $3,339 $3,859.94 $3,859.94 $2.21 $2.55 $2.55 $520.94 $2,783 $3,217.19 $3,217.19 $1.84 $2.13 $2.13 $434.19 $2,226 $2,573.29 $2,573.29 $1.47 $1.70 $1.70 $347.29 25,000 $3,780 $4,369.74 $4,369.74 $2.67 $3.09 $3.09 $589.74 $3,150 $3,641.45 $3,641.45 $2.23 $2.58 $2.58 $491.45 $2,520 $2,913.16 $2,913.16 $1.78 $2.06 $2.06 $393.1650,000 $4,448 $5,141.96 $5,141.96 $1.52 $1.76 $1.76 $693.96 $3,706 $4,284.20 $4,284.20 $1.26 $1.46 $1.46 $578.20 $2,965 $3,427.59 $3,427.59 $1.01 $1.17 $1.17 $462.59 100,000 $5,205 $6,017.06 $6,017.06 $0.58 $0.67 $0.67 $812.06 $4,338 $5,014.80 $5,014.80 $0.48 $0.55 $0.55 $676.80 $3,470 $4,011.38 $4,011.38 $0.39 $0.45 $0.45 $541.38250,000 $6,075 $7,022.80 $7,022.80 $0.78 $0.90 $0.90 $947.80 $5,063 $5,852.91 $5,852.91 $0.65 $0.75 $0.75 $789.91 $4,050 $4,681.87 $4,681.87 $0.52 $0.60 $0.60 $631.87500,000 $8,025 $9,277.03 $9,277.03 $1.61 $1.86 $1.86 $1,252.03 $6,688 $7,731.44 $7,731.44 $1.34 $1.55 $1.55 $1,043.44 $5,350 $6,184.69 $6,184.69 $1.07 $1.24 $1.24 $834.69 S-3 Motor Vehicle Fuel Dispensing 200 $2,410 $2,786.00 $2,786.00 $38.78 $44.83 $44.83 $376.00 $2,008 $2,321.28 $2,321.28 $32.32 $37.36 $37.36 $313.28 $1,607 $1,857.72 $1,857.72 $25.85 $29.88 $29.88 $250.72 1,000 $2,720 $3,144.36 $3,144.36 $47.28 $54.66 $54.66 $424.36 $2,267 $2,620.69 $2,620.69 $39.40 $45.55 $45.55 $353.69 $1,813 $2,095.86 $2,095.86 $31.52 $36.44 $36.44 $282.862,000 $3,193 $3,691.16 $3,691.16 $26.60 $30.75 $30.75 $498.16 $2,661 $3,076.16 $3,076.16 $22.16 $25.62 $25.62 $415.16 $2,129 $2,461.16 $2,461.16 $17.73 $20.50 $20.50 $332.164,000 $3,725 $4,306.16 $4,306.16 $10.35 $11.96 $11.96 $581.16 $3,104 $3,588.27 $3,588.27 $8.62 $9.96 $9.96 $484.27 $2,483 $2,870.39 $2,870.39 $6.90 $7.98 $7.98 $387.39 Attachment
A

Page 382 of 445 ends

UBC
Class Occupancy Type
Project Size
Threshold
Current
Fee
Full Cost using
% change
needed
Suggested
Base Fee
Current Fee
for Each
Additional
100 s.f.

Full Cost
using %
change
needed
Suggested Fee
for Each
Additional 100
s.f.

Difference in
base fee
Current
Fee
Full Cost using
% change
needed
Suggested
Base Fee
Current Fee
for Each
Additional
100 s.f.

Full Cost
using ICC
per sq ft
Suggested Fee
for Each
Additional 100
s.f.

Difference in
base fee
Current
Fee
Full cost using
% change
needed
Suggested
Base Fee
Current Fee
for Each
Additional
100 s.f.

Full Cost
using ICC
per sq ft
Suggested Fee
for Each
Additional 100
s.f.

Difference in
base fee

CITY OF COVINA

CONSOLIDATED SCHEDULE OF NEW CONSTRUCTION FEES (P/C PROCESSING AND INSPECTION COMBINED) (All Construction Types)

NEW CONSTRUCTION
Types IA Types IB, IIA, IIIA, VA Types IIB, IIIB, IV, VB 10,000 $4,346 $5,024.05 $5,024.05 $13.88 $16.05 $16.05 $678.05 $3,621 $4,185.93 $4,185.93 $11.56 $13.36 $13.36 $564.93 $2,897 $3,348.98 $3,348.98 $9.25 $10.69 $10.69 $451.9820,000 $5,733 $6,627.44 $6,627.44 $28.67 $33.14 $33.14 $894.44 $4,778 $5,523.45 $5,523.45 $23.89 $27.62 $27.62 $745.45 $3,822 $4,418.29 $4,418.29 $19.11 $22.09 $22.09 $596.29 S-3 Repair Garage 200 $1,756 $2,029.96 $2,029.96 $28.02 $32.39 $32.39 $273.96 $1,464 $1,692.41 $1,692.41 $23.35 $26.99 $26.99 $228.41 $1,171 $1,353.69 $1,353.69 $18.68 $21.59 $21.59 $182.69 1,000 $1,980 $2,288.91 $2,288.91 $34.18 $39.51 $39.51 $308.91 $1,650 $1,907.43 $1,907.43 $28.48 $32.92 $32.92 $257.43 $1,320 $1,525.94 $1,525.94 $22.78 $26.33 $26.33 $205.942,000 $2,322 $2,684.27 $2,684.27 $19.22 $22.22 $22.22 $362.27 $1,935 $2,236.89 $2,236.89 $16.02 $18.52 $18.52 $301.89 $1,548 $1,789.51 $1,789.51 $12.82 $14.82 $14.82 $241.514,000 $2,707 $3,129.34 $3,129.34 $7.47 $8.64 $8.64 $422.34 $2,256 $2,607.97 $2,607.97 $6.22 $7.19 $7.19 $351.97 $1,804 $2,085.45 $2,085.45 $4.98 $5.76 $5.76 $281.45 10,000 $3,155 $3,647.23 $3,647.23 $10.04 $11.61 $11.61 $492.23 $2,629 $3,039.17 $3,039.17 $8.37 $9.68 $9.68 $410.17 $2,103 $2,431.10 $2,431.10 $6.70 $7.75 $7.75 $328.1020,000 $4,159 $4,807.87 $4,807.87 $20.80 $24.05 $24.05 $648.87 $3,466 $4,006.75 $4,006.75 $17.33 $20.03 $20.03 $540.75 $2,773 $3,205.63 $3,205.63 $13.86 $16.02 $16.02 $432.63 S-4 Parking Garage 1,000 $1,791 $2,070.42 $2,070.42 $5.72 $6.61 $6.61 $279.42 $1,492 $1,724.78 $1,724.78 $4.77 $5.51 $5.51 $232.78 $1,194 $1,380.28 $1,380.28 $3.82 $4.42 $4.42 $186.28 5,000 $2,020 $2,335.15 $2,335.15 $6.98 $8.07 $8.07 $315.15 $1,683 $1,945.58 $1,945.58 $5.82 $6.73 $6.73 $262.58 $1,346 $1,556.00 $1,556.00 $4.66 $5.39 $5.39 $210.00 10,000 $2,369 $2,738.60 $2,738.60 $3.94 $4.55 $4.55 $369.60 $1,974 $2,281.98 $2,281.98 $3.28 $3.79 $3.79 $307.98 $1,579 $1,825.35 $1,825.35 $2.62 $3.03 $3.03 $246.3520,000 $2,762 $3,192.92 $3,192.92 $1.53 $1.77 $1.77 $430.92 $2,302 $2,661.15 $2,661.15 $1.28 $1.48 $1.48 $359.15 $1,842 $2,129.38 $2,129.38 $1.02 $1.18 $1.18 $287.3850,000 $3,222 $3,724.68 $3,724.68 $2.05 $2.37 $2.37 $502.68 $2,685 $3,103.90 $3,103.90 $1.71 $1.98 $1.98 $418.90 $2,148 $2,483.12 $2,483.12 $1.37 $1.58 $1.58 $335.12 100,000 $4,248 $4,910.76 $4,910.76 $4.25 $4.91 $4.91 $662.76 $3,540 $4,092.30 $4,092.30 $3.54 $4.09 $4.09 $552.30 $2,832 $3,273.84 $3,273.84 $2.83 $3.27 $3.27 $441.84 U-1 Agricultural Building 1,000 $2,238 $2,587.16 $2,587.16 $7.16 $8.28 $8.28 $349.16 $1,865 $2,155.97 $2,155.97 $5.96 $6.89 $6.89 $290.97 $1,492 $1,724.78 $1,724.78 $4.77 $5.51 $5.51 $232.78 5,000 $2,525 $2,918.94 $2,918.94 $8.73 $10.09 $10.09 $393.94 $2,104 $2,432.26 $2,432.26 $7.28 $8.42 $8.42 $328.26 $1,683 $1,945.58 $1,945.58 $5.82 $6.73 $6.73 $262.58 10,000 $2,961 $3,422.96 $3,422.96 $4.92 $5.69 $5.69 $461.96 $2,468 $2,853.05 $2,853.05 $4.10 $4.74 $4.74 $385.05 $1,974 $2,281.98 $2,281.98 $3.28 $3.79 $3.79 $307.9820,000 $3,453 $3,991.72 $3,991.72 $1.92 $2.22 $2.22 $538.72 $2,878 $3,327.01 $3,327.01 $1.60 $1.85 $1.85 $449.01 $2,302 $2,661.15 $2,661.15 $1.28 $1.48 $1.48 $359.1550,000 $4,028 $4,656.43 $4,656.43 $2.57 $2.97 $2.97 $628.43 $3,356 $3,879.59 $3,879.59 $2.14 $2.47 $2.47 $523.59 $2,685 $3,103.90 $3,103.90 $1.71 $1.98 $1.98 $418.90 100,000 $5,310 $6,138.45 $6,138.45 $5.31 $6.14 $6.14 $828.45 $4,425 $5,115.37 $5,115.37 $4.43 $5.12 $5.12 $690.37 $3,540 $4,092.30 $4,092.30 $3.54 $4.09 $4.09 $552.30

TENANT IMPROVEMENT
B Office Tenant Improvements 500 $1,940 $2,242.67 $2,242.67 $12.68 $14.66 $14.66 $302.67 $1,617 $1,869.28 $1,869.28 $10.56 $12.21 $12.21 $252.28 $1,294 $1,495.88 $1,495.88 $8.45 $9.77 $9.77 $201.88 2,500 $2,194 $2,536.30 $2,536.30 $15.45 $17.86 $17.86 $342.30 $1,828 $2,113.20 $2,113.20 $12.87 $14.88 $14.88 $285.20 $1,463 $1,691.25 $1,691.25 $10.30 $11.91 $11.91 $228.255,000 $2,580 $2,982.52 $2,982.52 $8.70 $10.06 $10.06 $402.52 $2,150 $2,485.43 $2,485.43 $7.25 $8.38 $8.38 $335.43 $1,720 $1,988.35 $1,988.35 $5.80 $6.70 $6.70 $268.35 10,000 $3,015 $3,485.39 $3,485.39 $3.38 $3.91 $3.91 $470.39 $2,512 $2,903.91 $2,903.91 $2.82 $3.26 $3.26 $391.91 $2,010 $2,323.59 $2,323.59 $2.26 $2.61 $2.61 $313.5925,000 $3,523 $4,072.64 $4,072.64 $4.53 $5.24 $5.24 $549.64 $2,935 $3,392.91 $3,392.91 $3.77 $4.36 $4.36 $457.91 $2,348 $2,714.33 $2,714.33 $3.02 $3.49 $3.49 $366.3350,000 $4,655 $5,381.26 $5,381.26 $9.31 $10.76 $10.76 $726.26 $3,879 $4,484.19 $4,484.19 $7.76 $8.97 $8.97 $605.19 $3,103 $3,587.12 $3,587.12 $6.21 $7.18 $7.18 $484.12 M Retail Tenant Improvements 200 $2,322 $2,684.27 $2,684.27 $38.37 $44.36 $44.36 $362.27 $1,935 $2,236.89 $2,236.89 $31.97 $36.96 $36.96 $301.89 $1,548 $1,789.51 $1,789.51 $25.58 $29.57 $29.57 $241.51 1,000 $2,629 $3,039.17 $3,039.17 $46.77 $54.07 $54.07 $410.17 $2,190 $2,531.68 $2,531.68 $38.97 $45.05 $45.05 $341.68 $1,752 $2,025.34 $2,025.34 $31.18 $36.04 $36.04 $273.342,000 $3,096 $3,579.03 $3,579.03 $26.31 $30.41 $30.41 $483.03 $2,580 $2,982.52 $2,982.52 $21.92 $25.34 $25.34 $402.52 $2,064 $2,386.02 $2,386.02 $17.54 $20.28 $20.28 $322.024,000 $3,622 $4,187.09 $4,187.09 $10.23 $11.83 $11.83 $565.09 $3,019 $3,490.01 $3,490.01 $8.52 $9.85 $9.85 $471.01 $2,415 $2,791.78 $2,791.78 $6.82 $7.88 $7.88 $376.78 10,000 $4,236 $4,896.88 $4,896.88 $13.74 $15.88 $15.88 $660.88 $3,530 $4,080.74 $4,080.74 $11.45 $13.24 $13.24 $550.74 $2,824 $3,264.59 $3,264.59 $9.16 $10.59 $10.59 $440.5920,000 $5,610 $6,485.25 $6,485.25 $28.05 $32.43 $32.43 $875.25 $4,675 $5,404.38 $5,404.38 $23.37 $27.02 $27.02 $729.38 $3,740 $4,323.50 $4,323.50 $18.70 $21.62 $21.62 $583.50 All Other Tenant Improvements 200 $1,995 $2,306.25 $2,306.25 $31.53 $36.45 $36.45 $311.25 $1,663 $1,922.45 $1,922.45 $26.28 $30.38 $30.38 $259.45 $1,330 $1,537.50 $1,537.50 $21.02 $24.30 $24.30 $207.50 1,000 $2,247 $2,597.57 $2,597.57 $38.48 $44.48 $44.48 $350.57 $1,837 $2,123.60 $2,123.60 $32.04 $37.04 $37.04 $286.60 $1,498 $1,731.71 $1,731.71 $25.63 $29.63 $29.63 $233.712,000 $2,632 $3,042.63 $3,042.63 $21.62 $24.99 $24.99 $410.63 $2,193 $2,535.14 $2,535.14 $18.01 $20.82 $20.82 $342.14 $1,755 $2,028.81 $2,028.81 $14.41 $16.66 $16.66 $273.814,000 $3,064 $3,542.03 $3,542.03 $8.41 $9.72 $9.72 $478.03 $2,554 $2,952.47 $2,952.47 $7.00 $8.09 $8.09 $398.47 $2,043 $2,361.74 $2,361.74 $5.60 $6.47 $6.47 $318.74 10,000 $3,569 $4,125.82 $4,125.82 $11.30 $13.06 $13.06 $556.82 $2,974 $3,437.99 $3,437.99 $9.41 $10.88 $10.88 $463.99 $2,379 $2,750.16 $2,750.16 $7.53 $8.70 $8.70 $371.1620,000 $4,698 $5,430.96 $5,430.96 $23.49 $27.15 $27.15 $732.96 $3,915 $4,525.80 $4,525.80 $19.58 $22.63 $22.63 $610.80 $3,132 $3,620.64 $3,620.64 $15.66 $18.10 $18.10 $488.64

SHELL BUILDINGS ONLY
A-2.1 Restaurant 1,000 $2,338 $2,702.77 $2,702.77 $7.50 $8.67 $8.67 $364.77 $1,949 $2,253.08 $2,253.08 $6.25 $7.23 $7.23 $304.08 $1,559 $1,802.23 $1,802.23 $5.00 $5.78 $5.78 $243.23 5,000 $2,639 $3,050.73 $3,050.73 $9.15 $10.58 $10.58 $411.73 $2,199 $2,542.08 $2,542.08 $7.63 $8.82 $8.82 $343.08 $1,759 $2,033.43 $2,033.43 $6.10 $7.05 $7.05 $274.43 10,000 $3,096 $3,579.03 $3,579.03 $5.16 $5.97 $5.97 $483.03 $2,580 $2,982.52 $2,982.52 $4.30 $4.97 $4.97 $402.52 $2,064 $2,386.02 $2,386.02 $3.44 $3.98 $3.98 $322.0220,000 $3,612 $4,175.53 $4,175.53 $2.01 $2.32 $2.32 $563.53 $3,010 $3,479.61 $3,479.61 $1.68 $1.94 $1.94 $469.61 $2,408 $2,783.69 $2,783.69 $1.34 $1.55 $1.55 $375.6950,000 $4,215 $4,872.61 $4,872.61 $2.67 $3.09 $3.09 $657.61 $3,513 $4,061.08 $4,061.08 $2.23 $2.58 $2.58 $548.08 $2,810 $3,248.41 $3,248.41 $1.78 $2.06 $2.06 $438.41 100,000 $5,550 $6,415.89 $6,415.89 $5.55 $6.42 $6.42 $865.89 $4,625 $5,346.57 $5,346.57 $4.63 $5.35 $5.35 $721.57 $3,700 $4,277.26 $4,277.26 $3.70 $4.28 $4.28 $577.26 B Medical Offices 1,000 $2,631 $3,041.48 $3,041.48 $9.21 $10.65 $10.65 $410.48 $2,193 $2,535.14 $2,535.14 $7.67 $8.87 $8.87 $342.14 $1,754 $2,027.65 $2,027.65 $6.14 $7.10 $7.10 $273.65 5,000 $2,999 $3,466.89 $3,466.89 $11.24 $12.99 $12.99 $467.89 $2,499 $2,888.88 $2,888.88 $9.36 $10.82 $10.82 $389.88 $2,000 $2,312.03 $2,312.03 $7.49 $8.66 $8.66 $312.03 10,000 $3,561 $4,116.57 $4,116.57 $6.30 $7.28 $7.28 $555.57 $2,968 $3,431.06 $3,431.06 $5.25 $6.07 $6.07 $463.06 $2,374 $2,744.38 $2,744.38 $4.20 $4.86 $4.86 $370.3820,000 $4,191 $4,844.86 $4,844.86 $2.46 $2.84 $2.84 $653.86 $3,493 $4,037.96 $4,037.96 $2.05 $2.37 $2.37 $544.96 $2,794 $3,229.91 $3,229.91 $1.64 $1.90 $1.90 $435.9150,000 $4,928 $5,696.85 $5,696.85 $3.32 $3.84 $3.84 $768.85 $4,106 $4,746.60 $4,746.60 $2.76 $3.19 $3.19 $640.60 $3,285 $3,797.51 $3,797.51 $2.21 $2.55 $2.55 $512.51 100,000 $6,585 $7,612.37 $7,612.37 $6.59 $7.62 $7.62 $1,027.37 $5,488 $6,344.22 $6,344.22 $5.49 $6.35 $6.35 $856.22 $4,390 $5,074.91 $5,074.91 $4.39 $5.07 $5.07 $684.91 B Office Building 1,000 $2,474 $2,859.98 $2,859.98 $8.66 $10.01 $10.01 $385.98 $2,062 $2,383.71 $2,383.71 $7.21 $8.33 $8.33 $321.71 $1,649 $1,906.27 $1,906.27 $5.77 $6.67 $6.67 $257.27 5,000 $2,820 $3,259.97 $3,259.97 $10.56 $12.21 $12.21 $439.97 $2,354 $2,721.26 $2,721.26 $8.80 $10.17 $10.17 $367.26 $1,880 $2,173.31 $2,173.31 $7.04 $8.14 $8.14 $293.31 10,000 $3,348 $3,870.34 $3,870.34 $5.94 $6.87 $6.87 $522.34 $2,790 $3,225.29 $3,225.29 $4.95 $5.72 $5.72 $435.29 $2,232 $2,580.23 $2,580.23 $3.96 $4.58 $4.58 $348.2320,000 $3,942 $4,557.02 $4,557.02 $2.31 $2.67 $2.67 $615.02 $3,285 $3,797.51 $3,797.51 $1.93 $2.23 $2.23 $512.51 $2,628 $3,038.01 $3,038.01 $1.54 $1.78 $1.78 $410.0150,000 $4,635 $5,358.13 $5,358.13 $3.09 $3.57 $3.57 $723.13 $3,863 $4,465.69 $4,465.69 $2.58 $2.98 $2.98 $602.69 $3,090 $3,572.09 $3,572.09 $2.06 $2.38 $2.38 $482.09 100,000 $6,180 $7,144.18 $7,144.18 $6.18 $7.14 $7.14 $964.18 $5,150 $5,953.48 $5,953.48 $5.15 $5.95 $5.95 $803.48 $4,120 $4,762.79 $4,762.79 $4.12 $4.76 $4.76 $642.79 M Store 1,000 $2,667 $3,083.10 $3,083.10 $8.66 $10.01 $10.01 $416.10 $2,223 $2,569.82 $2,569.82 $7.21 $8.33 $8.33 $346.82 $1,778 $2,055.40 $2,055.40 $5.77 $6.67 $6.67 $277.40 5,000 $3,014 $3,484.23 $3,484.23 $10.56 $12.21 $12.21 $470.23 $2,511 $2,902.76 $2,902.76 $8.80 $10.17 $10.17 $391.76 $2,009 $2,322.44 $2,322.44 $7.04 $8.14 $8.14 $313.44 10,000 $3,542 $4,094.61 $4,094.61 $5.93 $6.86 $6.86 $552.61 $2,951 $3,411.40 $3,411.40 $4.94 $5.71 $5.71 $460.40 $2,361 $2,729.35 $2,729.35 $3.95 $4.57 $4.57 $368.3520,000 $4,134 $4,778.97 $4,778.97 $2.32 $2.68 $2.68 $644.97 $3,445 $3,982.48 $3,982.48 $1.93 $2.23 $2.23 $537.48 $2,756 $3,185.98 $3,185.98 $1.55 $1.79 $1.79 $429.9850,000 $4,830 $5,583.56 $5,583.56 $3.09 $3.57 $3.57 $753.56 $4,025 $4,652.96 $4,652.96 $2.58 $2.98 $2.98 $627.96 $3,220 $3,722.37 $3,722.37 $2.06 $2.38 $2.38 $502.37 100,000 $6,375 $7,369.60 $7,369.60 $6.38 $7.38 $7.38 $994.60 $5,313 $6,141.91 $6,141.91 $5.31 $6.14 $6.14 $828.91 $4,250 $4,913.07 $4,913.07 $4.25 $4.91 $4.91 $663.07 H Lab / R&D 1,000 $2,810 $3,248.41 $3,248.41 $9.15 $10.58 $10.58 $438.41 $2,342 $2,707.39 $2,707.39 $7.62 $8.81 $8.81 $365.39 $1,874 $2,166.37 $2,166.37 $6.10 $7.05 $7.05 $292.37 5,000 $3,176 $3,671.51 $3,671.51 $11.18 $12.92 $12.92 $495.51 $2,647 $3,059.97 $3,059.97 $9.31 $10.76 $10.76 $412.97 $2,118 $2,448.44 $2,448.44 $7.45 $8.61 $8.61 $330.44 10,000 $3,735 $4,317.72 $4,317.72 $6.27 $7.25 $7.25 $582.72 $3,113 $3,598.68 $3,598.68 $5.23 $6.05 $6.05 $485.68 $2,490 $2,878.48 $2,878.48 $4.18 $4.83 $4.83 $388.4820,000 $4,362 $5,042.54 $5,042.54 $2.44 $2.82 $2.82 $680.54 $3,635 $4,202.12 $4,202.12 $2.03 $2.35 $2.35 $567.12 $2,908 $3,361.69 $3,361.69 $1.62 $1.87 $1.87 $453.6950,000 $5,093 $5,887.59 $5,887.59 $3.29 $3.80 $3.80 $794.59 $4,244 $4,906.13 $4,906.13 $2.74 $3.17 $3.17 $662.13 $3,395 $3,924.67 $3,924.67 $2.19 $2.53 $2.53 $529.67 100,000 $6,735 $7,785.77 $7,785.77 $6.74 $7.79 $7.79 $1,050.77 $5,613 $6,488.72 $6,488.72 $5.61 $6.49 $6.49 $875.72 $4,490 $5,190.51 $5,190.51 $4.49 $5.19 $5.19 $700.51 All Other Shell Buildings 1,000 $2,667 $3,083.10 $3,083.10 $8.66 $10.01 $10.01 $416.10 $2,223 $2,569.82 $2,569.82 $7.21 $8.33 $8.33 $346.82 $1,778 $2,055.40 $2,055.40 $5.77 $6.67 $6.67 $277.40 Attachment
A

Page 383 of 445 ends

UBC
Class Occupancy Type
Project Size
Threshold
Current
Fee
Full Cost using
% change
needed
Suggested
Base Fee
Current Fee
for Each
Additional
100 s.f.

Full Cost
using %
change
needed
Suggested Fee
for Each
Additional 100
s.f.

Difference in
base fee
Current
Fee
Full Cost using
% change
needed
Suggested
Base Fee
Current Fee
for Each
Additional
100 s.f.

Full Cost
using ICC
per sq ft
Suggested Fee
for Each
Additional 100
s.f.

Difference in
base fee
Current
Fee
Full cost using
% change
needed
Suggested
Base Fee
Current Fee
for Each
Additional
100 s.f.

Full Cost
using ICC
per sq ft
Suggested Fee
for Each
Additional 100
s.f.

Difference in
base fee

CITY OF COVINA

CONSOLIDATED SCHEDULE OF NEW CONSTRUCTION FEES (P/C PROCESSING AND INSPECTION COMBINED) (All Construction Types)

NEW CONSTRUCTION
Types IA Types IB, IIA, IIIA, VA Types IIB, IIIB, IV, VB 5,000 $3,014 $3,484.23 $3,484.23 $10.56 $12.21 $12.21 $470.23 $2,511 $2,902.76 $2,902.76 $8.80 $10.17 $10.17 $391.76 $2,009 $2,322.44 $2,322.44 $7.04 $8.14 $8.14 $313.44 10,000 $3,542 $4,094.61 $4,094.61 $5.93 $6.86 $6.86 $552.61 $2,951 $3,411.40 $3,411.40 $4.94 $5.71 $5.71 $460.40 $2,361 $2,729.35 $2,729.35 $3.95 $4.57 $4.57 $368.3520,000 $4,134 $4,778.97 $4,778.97 $2.32 $2.68 $2.68 $644.97 $3,445 $3,982.48 $3,982.48 $1.93 $2.23 $2.23 $537.48 $2,756 $3,185.98 $3,185.98 $1.55 $1.79 $1.79 $429.9850,000 $4,830 $5,583.56 $5,583.56 $3.09 $3.57 $3.57 $753.56 $4,025 $4,652.96 $4,652.96 $2.58 $2.98 $2.98 $627.96 $3,220 $3,722.37 $3,722.37 $2.06 $2.38 $2.38 $502.37 100,000 $6,375 $7,369.60 $7,369.60 $6.38 $7.38 $7.38 $994.60 $5,313 $6,141.91 $6,141.91 $5.31 $6.14 $6.14 $828.91 $4,250 $4,913.07 $4,913.07 $4.25 $4.91 $4.91 $663.07 * Each additional 100 square feet, or portion thereof, up to the next highest project size threshold. These costs are multi-variable blended rates, so they may not follow a specific pattern or trend. See Final Report for a detailed description.

Attachment
A

Page 384 of 445 ends

PLANNING FEES
# Title Current Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ 1 Additional Review Fee Actual Cost NA NA Actual Cost $0 2 Administrative Conditional Use Permit: Special Event (ACUP - Category 2) $105.00 $656.69 1% $650.00 $5453 Administrative Conditional Use Permit: Special Event such as Carnival, Car Show, K-Run, Small Scale Auto Sales, etc.4 Carnival, Car Show (ACUP - Catergory 3 - based on event intensity (# of attendees, street closure, or pop-ups) $1,869.00 $2,541.98 0% $2,541.00 $672 5 K-Run, Small Scale Auto Sales, etc. (ACUP - Category 3) $1,869.00 $2,541.98 0% $2,541.00 $672 6 Administrative Conditional Use Permit: Bingo, Las Vegas Nights, etc(. ACUP - Category 2) $158.00 $656.69 1% $650.00 $4927 Administrative Conditional Use Permit: Fee for Non-Profits, etc.(ACUP Category 2) $320.00 No Charge with Verification of IRS Exempt Status $656.69 1% $650.00 $3308 Administrative Conditional Use Permit: Pumpkin Patch & Christmas Tree Lot (over the counter review) (ACUP - Category 1) $225.00 $487.83 8% $450.00 $2259 ABC Investigation w/o CUP $105.00 $100.69 1% $100.00 -$5 10 ABC Investigation with CUP $105.00 $100.69 1% $100.00 -$511 Annexation (City) $10,830.00 $14,463.05 0% $14,463.00 $3,633 12 Annexation (Community Facility District - CFD) Actual Cost NA NA Actual Cost $0 13 Appeal to Planning Commission or City Council $1,699.00 $3,890.20 2% $3,800.00 $2,101 14 Assistant Planner Hourly Rate $61.00 $122.86 38% $76.00 $1515 Associate Planner Hourly Rate $67.59 $135.73 38% $84.00 $1616 Business License Zone Clearance Review (In-Home & Other) Counter Review $105.00 $122.86 1% $122.00 $1717 Business License Zone Clearance Review (Includes In-home and field inspection) $263.00 $245.72 0% $245.00 -$1818 Change in Nonconforming Use $4,134.00 $5,571.89 1% $5,500.00 $1,36619 City Attorney Review of Covenants, Easements, Agreements & Other Legal Documents (Per Hour) Contract Rate NA NA Contract Rate $020 Planning Manager Hourly Rate $88.00 $190.84 0% $190.00 $10221 Community Development Director Hourly Rate $210.00 $279.69 0% $279.00 $6922 Conditional Use Permit $4,134.00 $5,571.89 1% $5,500.00 $1,36623 Conditional Use Permit Modification $2,067.00 $5,571.89 51% $2,750.00 $68324 Conditional Use Permit (New and Modification within Town Center Specific Pl) $2,067.00 $5,571.89 51% $2,750.00 $683 25 PC Review of CUP Compliance $1,289.00 $1,475.40 0% $1,475.00 $186 26 Construction Plan Modification (Changes to Minor Building Plan Check after approval) $266.00 $354.01 0% $354.00 $8827 Construction Plan Review (Major) $266.00 $2,553.34 2% $2,500.00 $2,234 28 Constrction Plan Review (Minor) $266.00 $928.00 1% $920.00 $654 29 Designation of a Heritage Tree (Private Applicant) $5,970.00 $3,385.34 0% $3,385.00 -$2,585 30 Designation of Historic Landmark/Structure of Merit (Private Applicant) - If CEQA required, then additional fee. $5,970.00 $6,500.53 0% $6,500.00 $530 31 Environmental Review - Staff Review of Applicant's Initial Study, Environmental Reports or Studies (Plus Consultant Costs) $4,118.00 Fee is 15% of the total consultant(s) costs + consultant costs; 15% goes to Planning fee account, consultant costs go to deposit account NA NA Consultant Costs plus
15%
NA
32 Environmental Review - City's consultant(s) prepare Initial Study, ND, MND, or EIR. Deposit + Actual Costs Fee is 15% of the total consultant(s) costs + consultant costs; 15% goes to Planning fee account, consultant costs go to deposit account NA NA Consultant Costs plus
15%
NA
33 General Plan Amend - Text or Map Change $10,830.00
Fee is 15% of the total consultant(s) costs + consultant costs; 15% goes to Planning fee account, consultant costs go to deposit account NA NA Consultant Costs plus
15%
NA
34 General Plan Fee $2.00 per $1,000 of Construction Valuation $2.56 NA $2.50 per $1,000 of Construction Valuation $0.50 Attachment
A

Page 385 of 445 ends

PLANNING FEES
# Title Current Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ 35 Grading Plan Review $266.00 $678.64 1% $670.00 $404
36 Landscape & Construction Review Fee: Artificial Turf Installation or Single-Family Construction $354.00 $714.99 0% $714.00 $36037 Landscape & Construction Review Fee: Project Less Than 1 Acre $620.00 $982.88 0% $980.00 $360 38 Landscape & Construction Review Fee: Project 1.1 Acres to 2.99 Acres $886.00 $1,548.13 3% $1,500.00 $614 39 Landscape & Construction Review Fee: Project Over 3 Acres $1,330.00 $2,905.41 0% $2,900.00 $1,570 40 Lot Line Adjustment $773.00 $905.84 0% $905.00 $132
41 Outdoor Dining and Display - Less than 6 seats (Director's Review) $1,435.00 $782.98 0% $782.00 -$653 42 Outdoor Dining and Display - Less than 6 seats (PC Review) $1,435.00 $2,555.19 2% $2,500.00 $1,06543 Parking Agreement $4,134.00 $4,717.82 0% $4,717.00 $583 44 Photocopies:45 A. Counter information - Each page $0.10 NA NA $0.10 $0 46 B. Filed Information 47 First page $4.00 NA NA $4.00 $0 48 Each additional page $0.10 NA NA $0.10 $0
49 Planned Community Development (Establishment of PCD and Major Modification to PCD) (Boundary change or change precise plan) $10,830.00 $14,463.05 0% $14,463.00 $3,633 50 Planned Community Development (Minor Modification) (Change in COA, land use categories) $1,869.00 $5,571.89 0% $5,571.00 $3,702 51 Planning Technician Hourly Rate $52.00 $100.69 35% $65.00 $13 52 Preliminary Review $632.00
A substantially different project on the same site triggers a new Preliminary Review fee) $6,294.41 1% $6,200.00 $5,568
53 Senior Administrative Technician Hourly Rate $63.00 $101.65 23% $78.75 $16 54 Sign Permit - Permanent $316.00 $592.13 0% $590.00 $274 55 Sign Permit - Temporary $105.00 $346.41 0% $345.00 $240 56 Sign Program Review $1,128.00 $1,920.28 1% $1,900.00 $772 57 Site Plan Review (SPR) Major - applications listed under CMC 17.64.020 (C) $5,417.00 $8,936.60 0% $8,900.00 $3,483 58 Site Plan Review (SPR) Counter - applications listed under CMC 17.64.020(A) $105.00 $201.39 1% $200.00 $9559 Site Plan Review (SPR) Minor, applications listed under CMC 17.64.020(B) except for SB 35 project and construction of an ADU $205.00 $2,202.42 0% $2,200.00 $1,995 60 Plan Review (SPR) for SB 35 projects and Multi-family projects over 10 units $421.00 $8,936.60 0% $8,900.00 $8,47961 Site Plan Review (SPR) minor for ADU not qualify for streamlined building permit process $3,168.00 $837.85 0% $837.00 -$2,331 62 Site Plan Review (SPR) Administrative Time Extension $266.00 $592.13 0% $590.00 $324 63 Site Plan Review (SPR) Planning Commission Time Extension $812.00 $970.18 0% $970.00 $15864 Special Construction Permit (Noise) $177.00 $271.46 1% $270.00 $93 65 Special Plan Review (Lighting, CMD, Parking, etc.) $266.00 $542.91 1% $540.00 $274 66 Tentative Parcel Map $3,769.00 $7,215.46 0% $7,200.00 $3,431 67 Tentative Tract Map $10,830.00 $11,830.23 0% $11,830.00 $1,000 68 Tentative Tract Map/Tentative Parcel Map: Minor Amendment or Time Extension $500.00 $970.18 0% $970.00 $47069 Tree Preservation Permit Minor $1,128.00 $1,377.36 0% $1,377.00 $24970 Tree Preservation Permit Regular $2,504.00 $3,025.73 0% $3,025.00 $521 71 Vacation of Rights-of-Way $450.00 $542.91 0% $542.00 $9272 Variance Major (Non-Single-Family Structure) $4,134.00 $5,571.89 1% $5,500.00 $1,36673 Variance Major (Single-Family) $2,474.00 $3,943.15 1% $3,900.00 $1,426 74 Variance Minor $1,236.00 $974.30 0% $974.00 -$262
75 Verification & Research Fee Actual Cost NA NA Actual Cost $0 76 Zoning Ordinance Amend - Add Uses $4,736.00 $5,571.89 1% $5,500.00 $764 77 Zoning Ordinance Amend - Text or Map Change $10,830.00 (When tied to GPA, then it is included as part of the GPA deposit. If standalone application, then full fee applies) $14,463.05 0% $14,463.00 $3,633 78 Zoning Verification Letter $316.00 $469.27 16% $395.00 $7979 Short-Term Rental Permit (To be determined) New NA NA TBD NA80 Cannabis Permit Fee (To be determined) New NA NA TBD NA Attachment
A

Page 386 of 445 ends

PLANNING FEES
# Title Current Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ 81 Development Agreement New NA NA Deposit + Actual Costs NA 82 Establishment of new Specific Plan or Major Specific Plan amendment New NA NA Deposit + Actual Costs NA 83 Minor Specific Plan amendment (add land uses, modify development standards) New $5,571.89 1% $5,500.00 NA Attachment
A

Page 387 of 445 ends

AFFORDABLE HOUSING FEES
# Title
Current
Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ 1 Single Family/Multi-Family:
2 Loan subordination New
Applicable to houses bought/sold with affordable housing funds; not applicable to residential rehabilitation projects when the owner is requesting a subordination for a better rate with no cash out $2,175.28 93% $150.00 NA
3 Reconveyance/release New
Applicable to all past and future covenants, but only applicable if there are outstanding loan/grant obligations; not applicable if grant/loan period has expired and no loan/grant balance is due $2,175.28 100% $0.00 NA
4 Loan payoff demand New Applicable to all past and future covenants $2,175.28 100% $0.00 NA 5 Sale of Affordable Housing Units Overseen by City/HA:
6 Fee which applies if the seller tries to sell more than twice in a year New $630.11 92% $50.00 NA7 Fee would also apply if more than two potential buyers per sale attempt are reviewed and are not qualified New $630.11 84% $100.00 NA 8 Project Management Services:
9 Housing Authority of City conduit state or federal loan or grant application submitted on behalf of the developer, IF AND ONLY IF City/HA agree to do so on a case by case basis New NA NA
Actual Costs Based on FBR + Consultants Costs
NA
10 Request for change of project ownership- this would only apply to rental units which are owned by a management company or similar, not individually owned units New NA NA
Actual Costs Based on FBR + Consultants Costs
NA
11 Request for HA Board approval or CC approval except where HA/CC approval is included in another fee for service in this fee schedule New NA NA Actual Costs Based on FBR + Consultants Costs
NA
12 Compliance:

Applicable to any new affordable housing units in the City in which the monitoring is required to be overseen by the City/HA (within legal limits) 13 Application or annual renewal for temporary rental of owner-occupancy restricted unit, unless due to military service New $315.06 0% $315.00 NA14 Request for amendment or revision to existing Regulatory Agreement within approval authority of Executive Director; if HA board or CC approval required, separate fee will apply New $2,042.51 76% $500.00 NA
15 Annual monitoring fee for HA/City subsidized projects (per unit and annual, not applicable for bond projects where City is the issuer). Fee applies to any projects approved after effective date New NA NA
Annual at cost of consultant performing monitoring
NA
16 Annual monitoring fee for projects which include affordable housing monitoring and that preempt local ordinances/zoning codes or impose a monitoring requirement on the locality (i.e. density bonus, SB 4, surplus land/excess lands if applicable, etc.) New NA NA
Annual at cost of consultant performing monitoring
NA
Attachment
A

Page 388 of 445 ends

CODE ENFORCEMENT FEES
# Title Current Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ 1 Abandoned/Vacant Property Registration Fee $100.00 NA NA $100.00 $0 2 Appeal of Abatement $333.00 NA NA $333.00 $03 Compliance Inspection/Reinspection Fee $100.00 In excess of 4 inspections NA NA $100.00 $0 4 Rental Inspection Fee (1-3 Units) $126.00 $18 Per Additional Unit NA NA $126.00 $0 5 Street Vendor $400.00 $100 for each employee NA NA $400.00 $06 Shopping Cart Containment/Retrieval Plan Review $654.00 NA NA $654.00 $0 Attachment
A

Page 389 of 445 ends

POLICE DEPARTMENT FEES
# Title
Current
Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Unit Fee Δ 1 Administrative Tow Fee $129.00 Needs Review (License & Hearing) $144.69 3% $140.00 $112 Bingo Permits $50.00 NA NA $50.00 $0 3 Carnival $2,445.00 $2,681.85 1% $2,650.00 $205
4 CCW Amended License fee $10.00 Per GC 26190 NA NA $10.00 $05 CCW Permit Initial Application $100.00 Per GC 26190/Not to exceed $400.00 $556.45 28% $400.00 $3006 CCW Permit Renewal $25.00 Per GC 26190 NA NA $25.00 $07 Citation Signoffs $25.00 $52.30 43% $30.00 $58 Disturbance Violation Service Fee (Plus Actual Cost of Personnel) Actual Cost NA NA Actual Cost $09 Entertainment Permit 0-49 Live $377.00 Live & Non-Live $648.52 38% $400.00 $23 10 Entertainment Permit 100 & Up Live $1,000.00 Deposit +/- Actual Cost Live & Non-Live $1,123.57 11% $1,000.00 Deposit +/- Actual Cost $0 11 Entertainment Permit 50-99 Live $652.00 Live & Non-Live $784.25 11% $700.00 $48 12 Late Fee for Entertainment Permit
13 15-30 calendar days late New NA NA $50.00 NA14 31-45 calendar days late New NA NA $100.00 NA15 46-90 calendar days late New NA NA $150.00 NA16 Fingerprinting (Plus DOJ Fees) $25.00 Plus DOJ Fees-CCW/Cannabis NA NA $25.00 $017 Local Clearance Letter (Visa, Employment, Personal, etc.) $25.00 $52.71 43% $30.00 $5 18 Location/Premise History Search $0.25 per page $21.08 5% $20.00 per search Varies19 Lost Citation $0.25 per page $17.57 43% $10.00 per citation Varies 20 Outside Employment (Plus Actual Cost of Personnel) Varies Burden Rate for Personnel NA NA Varies $0 21 Overnight Parking Permit - Daily $4.00 NA NA $5.00 $122 Overnight Parking Permit - (Annual) $20.00 NA NA $80.00 $60 23 Private Patrols Operators Invest. (1-5 guards) $475.00 $530.38 10% $475.00 $0 24 Private Patrols Operators Invest. (6 and up guards) $950.00 $1,064.50 11% $950.00 $025 Late Fee for PPO Permit 26 15-30 calendar days late New NA NA $25.00 NA27 31-45 calendar days late New NA NA $50.00 NA28 46-90 calendar days late New NA NA $75.00 NA29 Promoter Permit $500.00 NA NA $500.00 $0 30 Restitution/DUI Reimbursement (Hourly or Fraction Thereof) Actual Cost Per GC 53150-53159; Plus Actual Cost of Personnel at Scene Up to Maximum NA NA Actual Cost $0 31 Second Hand Dealer License $300.00 Online Process Now, matches DOJ Fee $369.51 19% $300.00 $0 32 Second Hand Dealer Renewal $300.00 Online Process Now, matches DOJ Fee $369.51 19% $300.00 $033 Traffic Collision Report - Injury or Non-Injury (Per Report) $20.00 20012 CVC $31.63 5% $30.00 $1034 Vehicle Release $60.00 $161.85 7% $150.00 $90 35 Vehicle Repossessions Entry Receipt $15.00 NA NA $15.00 $0 36 Witness Fees - Civilian $275.00 NA NA $275.00 $037 Witness Fees - Sworn $275.00 NA NA $275.00 $038 Dog License Fees39 Unaltered $60.00 $283.72 65% $100.00 $4040 Altered $20.00 $94.57 68% $30.00 $1041 S/C Unaltered $60.00 $283.72 65% $100.00 $40 42 S/C Altered $7.50 $35.47 72% $10.00 $343 Veteran Disability Altered $7.50 $35.47 79% $7.50 $044 Penalty $60.00 $283.72 82% $50.00 -$10 45 Potentially Dangreous New NA NA $125.00 NA46 Cat License Fees47 Unaltered / S/C Unaltered $5.00 $23.64 58% $10.00 $548 Aletered / S/C Altered $5.00 $23.64 79% $5.00 $0 49 Penalty New NA NA $100.00 NA
Attachment
A

Page 390 of 445 ends

POLICE DEPARTMENT FEES
# Title
Current
Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Unit Fee Δ 50 Impound Fees51 Dog - 1st Offense Altered $2.00 NA NA $30.00 $2852 Dog - 1st Offense Unaltered $55.00 NA NA $50.00 -$553 Dog - 2nd Offense Altered $4.00 NA NA $70.00 $66 54 Dog - 2nd Offense Unaltered $75.00 NA NA $10.00 -$65 55 Dog - 3rd Offense Altered $60.00 NA NA $120.00 $6056 Dog - 3rd Offense Unaltered $95.00 NA NA $120.00 $2557 Cat - Altered See Above NA NA $5.00 NA58 Cat - Unaltered See Above NA NA $5.00 NA 59 Small Animal $10.00 NA NA $15.00 $560 Medium Animal $10.00 NA NA $25.00 $15 61 Large Animal $10.00 NA NA $60.00 $50
62 Food & Care63 Dog $18.00 $85.12 88% $10.00 -$8
64 Cat $18.00 $85.12 88% $10.00 -$8
65 Small Animal $12.00 $56.74 91% $5.00 -$7
66 Medium Animal $12.00 $56.74 82% $10.00 -$267 Large Animal $12.00 $56.74 30% $40.00 $28 68 Biter (OBS) Animal $18.00 $85.12 77% $20.00 $269 Owner Release - Licensesd70 Per Animal $20.00 $94.57 58% $40.00 $2071 Per Liter $25.00 $118.22 75% $30.00 $572 O/R Pickup Live $30.00 $141.86 79% $30.00 $0 73 O/R Pickup Dead (DOA) $20.00 $94.57 79% $20.00 $0
74 Owner Release - Unlicensed75 Per Animal $40.00 $189.15 47% $100.00 $6076 Per Liter $30.00 $141.86 30% $100.00 $7077 O/R Pickup Live $60.00 $283.72 65% $100.00 $4078 O/R Pickup Dead (DOA) $40.00 $189.15 47% $100.00 $60 Attachment
A

Page 391 of 445 ends

PARKING VIOLATION CODE AND SCHEDULE OF PENALTIES
# Violation Code Title
Current Violation
Amount Delinq. Amount
Proof of
Correction Notes Full Cost Subsidy %
Suggested Violation
Amount
Suggested Delinq.

Amount
Suggested Proof of
Correction
Violation Amount Fee Δ
Delinq. Amount Fee Δ
Proof of Correction Amount Fee Δ
1 10.32.020 CMC Within Marked Lanes $35.00 $65.00 N/A NA NA $40.00 $70.00 N/A $5 $5 $0 2 10.32.030 CMC Stopping, Standing, Parking Within Parkway $45.00 $75.00 N/A NA NA $50.00 $80.00 N/A $5 $5 $0 3 10.32.040 CMC No Parking Signs $45.00 $75.00 N/A NA NA $50.00 $80.00 N/A $5 $5 $0 4 10.32.050 CMC Posted Temporary No Parking Zone $45.00 $75.00 N/A NA NA $50.00 $80.00 N/A $5 $5 $0 5 10.32.070 CMC Parking Restricted Signed/Curb Marking 1hr, 2hr, 3hr 4hr $45.00 $75.00 N/A NA NA $50.00 $80.00 N/A $5 $5 $06 10.10.32.000 CMC 24 hr Blue Zone $35.00 $65.00 N/A NA NA $40.00 $70.00 N/A $5 $5 $0 7 10.32.110 CMC Unauthorized on City Property $45.00 $75.00 N/A NA NA $50.00 $80.00 N/A $5 $5 $08 10.32.112 A CMC Parking Metere Expired $45.00 $75.00 N/A NA NA $50.00 $80.00 N/A $5 $5 $09 10.32.112 B CMC Pay-by-Space / Pay-and-Display Expired $45.00 $75.00 N/A NA NA $50.00 $80.00 N/A $5 $5 $0 10 10.32.114 B CMC Failure to pay for Space and/or Display Receipt $45.00 $75.00 N/A NA NA $50.00 $80.00 N/A $5 $5 $0 11 10.32.115 A CMC Illegal, Overtime, or Expired Metered Space $45.00 $75.00 N/A NA NA $50.00 $80.00 N/A $5 $5 $012 10.32.115 B CMC Illegal, Overtime, or Expired Pay-by-Space Space $45.00 $75.00 N/A NA NA $50.00 $80.00 N/A $5 $5 $0 13 10.32.115 C CMC Illegal, Overtime, or Expired Pay-by-Display Space $45.00 $75.00 N/A NA NA $50.00 $80.00 N/A $5 $5 $0 14 10.32.120 CMC Parked on Grade without Wheel Blocks $30.00 $60.00 N/A NA NA $35.00 $65.00 N/A $5 $5 $0 15 10.32.140 B CMC Washing or Repairing Vehicle in the Street $45.00 $75.00 N/A NA NA $50.00 $80.00 N/A $5 $5 $0 16 10.32.160 B CMC Temporary/Emergency Signs No Operating, Parking or Standing of Vehicles $45.00 $75.00 N/A NA NA $50.00 $80.00 N/A $5 $5 $0 17 10.32.180 CMC Overnight Parking $45.00 $75.00 N/A NA NA $50.00 $80.00 N/A $5 $5 $018 10.32.190 CMC Commercial Vehicle Parked 30 Minutes or More $70.00 $100.00 N/A NA NA $75.00 $105.00 N/A $5 $5 $0 19 10.32.200 A CMC Parking, Storing Commercial Vehicle in Residential Zone $70.00 $100.00 N/A NA NA $75.00 $105.00 N/A $5 $5 $0 20 10.32.200 B CMC Parking, Storing of Commercial Vehicle $70.00 $100.00 N/A NA NA $75.00 $105.00 N/A $5 $5 $0 21 10.32.210 A CMC Parking or Storing Trailers, Motor Homes, Motor Vehicles Front/Side Yard $45.00 $75.00 N/A NA NA $50.00 $80.00 N/A $5 $5 $022 10.32.220 CMC Must Move 150 ft When Time Limit is Up $45.00 $75.00 N/A NA NA $50.00 $80.00 N/A $5 $5 $0 23 10.36.020 (1) CMC No Parking Red Cub $45.00 $75.00 N/A NA NA $50.00 $80.00 N/A $5 $5 $024 10.36.020 (2) CMC Loading Zone $30.00 $60.00 N/A NA NA $35.00 $65.00 N/A $5 $5 $025 10.36.020 (3) CMC White Curb $30.00 $60.00 N/A NA NA $35.00 $65.00 N/A $5 $5 $0 26 10.36.020 (4) CMC Green Curb $30.00 $60.00 N/A NA NA $35.00 $65.00 N/A $5 $5 $0 27 10.36.050 CMC Passenger Loading and Unloading Zone $45.00 $75.00 N/A NA NA $50.00 $80.00 N/A $5 $5 $0 28 10.36.060 CMC Parking in Alley $35.00 $65.00 N/A NA NA $40.00 $70.00 N/A $5 $5 $0 29 10.36.070 G CMC Bus Zone $45.00 $75.00 N/A NA NA $50.00 $80.00 N/A $5 $5 $0 30 10.36.080 C CMC Taxi Zone $25.00 $55.00 N/A NA NA $30.00 $60.00 N/A $5 $5 $0 31 17.26.110 E CMC Storage Motor Home/Trailer $45.00 $75.00 N/A NA NA $50.00 $80.00 N/A $5 $5 $0 32 21113 (a) VC Unlawful Parking on Public Grounds $40.00 $70.00 N/A NA NA $45.00 $75.00 N/A $5 $5 $033 22500 (a) VC Parking, Standing, Stopping in Intersection $45.00 $75.00 N/A NA NA $50.00 $80.00 N/A $5 $5 $0 34 22500 (b) VC Parking, Standing, Stopping in Crosswalk $45.00 $75.00 N/A NA NA $50.00 $80.00 N/A $5 $5 $0 35 22500 (c) VC Parking, Standing, Stopping in a Safety Zone $45.00 $75.00 N/A NA NA $50.00 $80.00 N/A $5 $5 $0 36 22500 (d) VC Parking, Standing, Stopping Within 15' of Fire Station $45.00 $75.00 N/A NA NA $50.00 $80.00 N/A $5 $5 $0 37 22500 (e) VC Parking, Stanindg, Stopping in Front of Driveway $45.00 $75.00 N/A NA NA $50.00 $80.00 N/A $5 $5 $0 38 22500 (f) VC Parking, Standing, Stopping on a Sidewalk $45.00 $75.00 N/A NA NA $50.00 $80.00 N/A $5 $5 $0 39 22500 (g) VC Parking, Standing, Stopping Alongside Highway Excavation $45.00 $75.00 N/A NA NA $50.00 $80.00 N/A $5 $5 $040 22500 (h) VC Double Parking $45.00 $75.00 N/A NA NA $50.00 $80.00 N/A $5 $5 $0 41 22500 (i) VC Parked in Bus Loading Zone $270.00 $300.00 N/A NA NA $275.00 $305.00 N/A $5 $5 $0 42 22500 (j) VC Parked in Tunnel $45.00 $75.00 N/A NA NA $50.00 $80.00 N/A $5 $5 $043 22500 (k) VC Parking, Stnading, Stopping on Bridge $45.00 $75.00 N/A NA NA $50.00 $80.00 N/A $5 $5 $0 44 22500 (l) VC Blocking Disabled Access Ramp $270.00 $300.00 N/A NA NA $275.00 $305.00 N/A $5 $5 $0 45 22500.1 VC Parking in Fire Lane $70.00 $100.00 N/A NA NA $75.00 $105.00 N/A $5 $5 $0 46 22502 (a) VC Parking More Than 18" from the Curb $45.00 $75.00 N/A NA NA $50.00 $80.00 N/A $5 $5 $047 22507.8 VC Handicapped Zone - Parking in Space $345.00 $375.00 $10.00 NA NA $350.00 $380.00 $10.00 $5 $5 $0 48 22507.8 VC Hnadicapped Zone - Obstructing/Blocking Space $345.00 $375.00 $10.00 NA NA $350.00 $380.00 $10.00 $5 $5 $0 49 22507.8 (c)(1) VC Parking, Standing on the Boundary Lines Designating for Disabled Parking $345.00 $375.00 N/A NA NA $350.00 $380.00 N/A $5 $5 $0 50 22507.8 (c)(2) VC Parking, Standing on the Crosshatched Lines Designating for Disabled Parking $345.00 $375.00 N/A NA NA $350.00 $380.00 N/A $5 $5 $0 51 22514 VC Fire Hydrant Within 15 Feet $45.00 $75.00 N/A NA NA $50.00 $80.00 N/A $5 $5 $052 22515 VC Vehicle Left Unattended on Highway $45.00 $75.00 N/A NA NA $50.00 $80.00 N/A $5 $5 $0 53 22516 VC Locked Vehicle with Person Inside $50.00 $80.00 N/A NA NA $55.00 $85.00 N/A $5 $5 $054 22517 VC Opening and Closing Doors $40.00 $70.00 N/A NA NA $45.00 $75.00 N/A $5 $5 $055 22521 VC Parked Within 7½ ft of RR $50.00 $80.00 N/A NA NA $55.00 $85.00 N/A $5 $5 $0 56 22522 VC Parking on or Within 3' of Access Ramp $295.00 $325.00 N/A NA NA $300.00 $330.00 N/A $5 $5 $0 57 26703 (b) Window Glaze $30.00 $60.00 $10.00 NA NA $35.00 $65.00 $10.00 $5 $5 $0 58 26708 (a)(1) VC Window Tint $70.00 $100.00 $10.00 NA NA $75.00 $105.00 $10.00 $5 $5 $0 59 26708 (a)(2) Window Obstruction $70.00 $100.00 $10.00 NA NA $75.00 $105.00 $10.00 $5 $5 $0 60 26710 VC Cracked Windshield / Rear Window $45.00 $75.00 $10.00 NA NA $50.00 $80.00 $10.00 $5 $5 $0 61 4000 (a)(1) VC No Current Registration $70.00 $100.00 $10.00 NA NA $75.00 $105.00 $10.00 $5 $5 $0 62 40225 (c) VC Equipment Violations with Proof of Correction $0.00 $0.00 $10.00 NA NA $5.00 $0.00 $10.00 $5 $0 $0 63 40226 VC Failure to Display a Disabled Placard - Proof of Valid Placard $0.00 $0.00 $10.00 NA NA $5.00 $0.00 $10.00 $5 $0 $0 Attachment
A

Page 392 of 445 ends

PARKING VIOLATION CODE AND SCHEDULE OF PENALTIES
# Violation Code Title
Current Violation
Amount Delinq. Amount
Proof of
Correction Notes Full Cost Subsidy %
Suggested Violation
Amount
Suggested Delinq.

Amount
Suggested Proof of
Correction
Violation Amount Fee Δ
Delinq. Amount Fee Δ
Proof of Correction Amount Fee Δ
64 4462 (b) VC Wrong Vehicle Registration $45.00 $75.00 N/A NA NA $50.00 $0.00 N/A $5 -$75 $0 65 5200 (a) VC No Front / Rear License Plate as Issued $45.00 $75.00 $10.00 NA NA $50.00 $0.00 $10.00 $5 -$75 $0 66 5201 VC Unattached / Not Visible License Plates $70.00 $100.00 $10.00 NA NA $75.00 $0.00 $10.00 $5 -$100 $067 5204 (a) VC No Current Month/Year Tabs $80.00 $110.00 $10.00 NA NA $85.00 $0.00 $10.00 $5 -$110 $0 Attachment
A

Page 393 of 445 ends

Attachment A

Page 394 of 445 ends

ATTACHMENT B
RESOLUTION CC 2025-39

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF COVINA,

CALIFORNIA, ADOPTING A CITY-WIDE COMPREHENSIVE USER

FEE STUDY, ADOPTING A COMPREHENSIVE FEE SCHEDULE

ESTABLISHING AND AMENDING CERTAIN SERVICE AND

DEVELOPMENT-RELATED FEES FOR CITY SERVICES, AND

AUTHORIZING THE PAYMENT OF SUCH FEES BY CREDIT CARD,

DEBIT CARD OR ELECTRONIC FUNDS TRANSFER

THE CITY COUNCIL OF THE CITY OF COVINA DOES HEREBY RESOLVES AS FOLLOWS:

SECTION 1. The City Council of the City of Covina ("City Council") hereby finds, determines and declares that:

A. The City Council has conducted an extensive analysis of its services, the costs reasonably borne by the City in provided those services, the beneficiaries of those services, and the revenues produced by those paying fees and charges for special services; B. The City Council has determined that City staff provides many types of services ("Services") involving requests by City customers ("Applicants"); and C. The City currently imposes service fees ("Service Fees") and development-related fees ("Development Fees") upon Applicants to recover the costs of staff time, copying costs, and other expenses related to providing these Services; and D. Current Service Fees and Development Fees charged for the City's Services do not adequately recoup the City's costs of providing certain Services and thus, a significant amount of these costs are currently paid out of the City's general fund and, therefore, borne by the general public; and
E. The City Council finds that providing these Services is of special benefit to Applicants both separate and apart from the general benefit to the public; and therefore, in the interests of fairness to the general public, the City desires to better recover the costs of providing these Services from Applicants who have sought the City's Services by revising its schedule of City-Wide Fees; and
F. The proposed Service Fees and Development Fees are initially based upon the information contained in a document by City staff and Consultant ("Consultant") entitled "City of Covina User Fee Study" ("Fee Study"), and updated by staff to reflect current costs of the City to provide the Services; and
G. Based upon the Fee Study and the updated information, the City (i) identifies the purpose of the proposed fees, (ii) identifies the use to which the fees will be put, (iii) demonstrates a reasonable relationship between the fees' use and the types of projects on which the fees are imposed, and (iv) demonstrates a reasonable relationship between the amount of the

Page 395 of 445 ends

Resolution CC 2025-39 Page 2 of 4
fees and the cost of the City's Services attributable to the applications on which the fees are imposed; and
H. Pursuant to state law, the City may impose service fees for certain services.

I. Pursuant to Government Code Section 66000, et seq., the City is empowered to impose Development Fees covering up to 100 percent of the actual costs of providing Services to Applicants; and
J. The City desires to adjust certain fees up to the actual costs incurred by the City in providing these Services; and
K. Section 3.02.010 of the Covina Municipal Code provides that the City may set fees to recoup costs reasonably borne by the City by means of adopting a resolution of the City Council, after compliance with the requirements of state law; and L. Government Code Section 66014 et al. allows local agencies to charge fees for various activities as long as those fees do not exceed the estimated reasonable costs of provided the service for which the fee is intended; and
M. Pursuant to Government Code Sections 66014, 66016, 66017 and 66018 and the Covina Municipal Code, the specific fees to be charged for certain regulations, services and products must be adopted by resolution, following notice and public hearing; and N. Notice of public hearing has been given pursuant to Government Code Section 6062a, and written notice has been provided to interested parties who filed written requests for mailed notice of meetings on new or increased development-related fees or service charges; and
O. The City Council conducted a duly noticed public hearing on May 6, 2025, at which time the public was invited to make oral and written presentations as part of the regularly scheduled meeting prior to the adoption of this Resolution; and P. At least ten (10) days prior to the public hearing referenced above, the City made available for public inspection information required under Government Code Section 66000, et seq.; and
Q. The City published notice of the public hearing as described above in accordance with Government Code Sections 6062(a), 66014, 66016, 66017 and 66018 for the various Service Fees and Development Fees; and
R. The establishment and increase of Service Fees and Development Fees is statutorily and categorically exempt from the requirements of the California Environmental Quality Act because setting Service Fees and Development Fees fits within the statutory exemptions for local agency decisions involving rates, tolls or other charges pursuant to Public Resources Code Section 21080(b)(8) and Section 15273 of the California Environmental Quality Act Guidelines this Resolution is not "an essential step culminating

Page 396 of 445 ends

Resolution CC 2025-39 Page 3 of 4
in action which may affect the environment"; and
S. Pursuant to Government Code Section 6159, the City may provide for payment by credit card, debit card or electronic funds transfer and can impose a fee or charge for the transactional costs associated with the use of such methods; and T. According to Government Code Section 6159, the City must obtain approval from the City Council to provide for payment by credit card, debit card or electronic funds transfer; and U. The City is also expressly authorized to impose a fee for the use of a credit card, debit card or electronic fund transfer, so long as the fee does not exceed the costs incurred by the City in providing for the payment by credit card.

SECTION 2. Adoption of the Report and Methodology. The City Council hereby approves "City of Covina User Fee Study Report", and updated by staff to reflect current costs of the City to provide the Services and adopts the methodology for calculating and collecting the fees and charges established therein.

SECTION 3. Adoption of Fees and Charges. The City Council hereby adopts the "City of Covina City-Wide User Fee Schedule" as set forth in attached Exhibit "A" and incorporated by this reference. Unless otherwise stated in the Fee Schedule, all Service Fees and Development Fees shall be paid to the City by the Applicant prior to the City's performance of the requested Services.

SECTION 4. Repeal of Conflicting Resolutions. It is the desire of the City Council that all fees and charges for services, programs or products be set forth in one document for ease of reference. Accordingly, any and all provisions of prior Resolutions of the City Council establishing or modifying fees for the services, programs or products set forth in Exhibit "A," are hereby repealed and replaced as of the effective date of this Resolution in the manner set forth in Exhibit "A;" provided, however, that such repeal shall not excuse or affect the failure of any person or entity to pay any fee heretofore imposed upon such person or entity. The City Council desires to clarify that in adopting this Resolution, it is taking action only on those fees for the services, programs or products set forth in Exhibit A which have been modified from prior resolutions of the City Council. The remaining fees that have not been modified from prior resolutions shall remain in full force and effect and are hereby restated for convenience so that all fees are set forth in one document.

SECTION 5. Environmental Exemption. The adoption of this Resolution is exempt from the California Environmental Quality Act ("CEQA," Public Resources Code Sections 21000 et seq.), because it approves and sets forth a procedure for determining fees for the purpose of meeting the operating expenses of City departments, as set forth in Public Resources Code Section 21080(b)(8)(A).

SECTION 6. Pursuant to Government Code Section 6159, the City Council hereby authorizes the City to provide for payment of Service and Development Fees by credit card, debit card or electronic funds transfer and charge a fee for processing the payment, so long as the fee does not exceed the costs incurred by the City in providing for the payment by credit card, debit card or electronic funds transfer, as set forth in Exhibit A.

Page 397 of 445 ends

Resolution CC 2025-39 Page 4 of 4
SECTION 7. Severability. If any section, subsection, subdivision, paragraph, sentence, clause or phrase of this Resolution or any part hereof is for any reason held to be invalid or unconstitutional, such decision shall not affect the validity of the remaining portion of this Resolution or any part thereof. The City Council hereby declares that it would have passed each section, subsection, subdivision, paragraph, sentence, clause or phrase hereof, irrespective of the fact that any one or more section, subsection, subdivision, paragraph, sentence, clause or phrase be declared invalid or unconstitutional.

SECTION 8. Effective Date. This Resolution shall take effect July 1, 2025; provided, however, that the Development Fees established hereunder shall first be imposed and collected sixty (60) days from the date of adoption of this Resolution. All Service Fees shall take effect immediately upon adoption of this Resolution.

SECTION 9. Certification. The Mayor shall sign this Resolution and the City Clerk shall attest and certify to the passage and adoption thereof.

APPROVED and PASSED this 6th day of May, 2025.

City of Covina, California
BY:

VICTOR LINARES, Mayor
ATTEST:

FABIAN VELEZ, Chief Deputy City Clerk

CERTIFICATION
I, Fabian Velez, Chief Deputy City Clerk of the City of Covina, do hereby certify that Resolution CC 2025-39 was duly adopted by the City Council of the City of Covina at a regular meeting held on the 6th day of May, 2025, by the following vote:

AYES: COUNCIL MEMBERS:

NOES: COUNCIL MEMBERS:

ABSTAIN: COUNCIL MEMBERS:

ABSENT: COUNCIL MEMBERS:

Dated:

FABIAN VELEZ, Chief Deputy City Clerk

Page 398 of 445 ends

CITY CLERK/RECORDS MANAGEMENT FEES
# Title
Current
Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ 1 Annual Subscription of Agenda Packet $93.00 $115.71 20% $93.00 $0 2 Candidate Nomination Filing $25.00 Per Election Code Section 10228 NA NA $25.00 $03 Documents - USB New $34.38 83% $6.00 NA 4 Certification by City Clerk $15.00 $48.70 69% $15.00 $0 5 Copies of Documents (Letter or Legal - Black & White Copies) $0.25 $16.23 99% $0.10 -$0.156 Copies of Documents (Letter or Legal - Color Copies) $0.40 $16.23 98% $0.25 -$0.157 Copies of Documents (Oversized Pages) (11x17" or Greater) $2.00 $16.23 88% $2.00 $08 Council Meeting DVD or Audio CD $15.00 $29.13 83% $5.00 -$10 9 Fax Transmissions or Email Documents No Charge NA NA No Charge $0 10 Mailing Documents Actual Cost NA NA Actual Cost $0
11 Notary Service N/A Per GC Section 8211 NA NA N/A $012 Political Reform Act Late Filing $10.00 Per Day Set By Government Code 91013; $100 Maximum NA NA $10.00 $0 13 Reproduction of Campaign Statements (FPPC) $0.10 Set by Government Code 81008 NA NA $0.10 $014 Reproduction of Campaign Statements Which Are Five or More Years Old (FPPC) $0.10 Set by Government Code 81008 NA NA $0.10 $0 15 Reproduction of Conflict of Interest Statements (FPPC) $0.10 Set by Government Code 81008 NA NA $0.10 $016 Subpoena For Personal Appearance $275.00 Set by Government Code 68096.1.B NA NA $275.00 $017 Subpoena of Records $15.00 Charged Under The Accounting Code for Copies. Evidence Code 1563.6 NA NA $15.00 $0 18 Sign Retrieval Fee New
per
Retrieval
Trip
$53.98 81% $10.00 NA
19 Initiative Petition Fee $200.00 Set by Elections Code 9202.B NA NA $200.00 $0 Exhibit
A

Page 399 of 445 ends

FINANCE FEES
# Title Current Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ 1 Business License - Change $5.00 Contracted Amount plus staff time $18.06 0% $18.00 $132 Business License - Close Out Sale Adjustment $10.00 Contracted Amount $23.06 0% $23.00 $133 Business License Processing Fee (New Application) $30.00 Contracted Amount plus staff time $30.45 1% $30.00 $04 Business License Processing Fee (Renewal) $30.00 Contracted Amount plus staff time $30.41 1% $30.00 $05 Credit Card Use Fee Actual Cost Per CA Government Code 6159 NA NA Actual Cost $06 Returned Check Fee $25.00 For First Check; $35.00 for Each Additional Check per CA Civil Code 1719 NA NA $25.00 $07 Yard Sale Permit $10.00 $12.42 20% $10.00 $0 Exhibit
A

Page 400 of 445 ends

FILM FEES
# Title Current Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ 1 Permit Fee $300.00 Film Permit $690.51 0% $690.00 $390 2 Student Permit Fee New Student Film Permit $690.51 57% $300.00 NA 3 State Mandated SB 1186 $4.00 State Mandated NA NA $4.00 $04 Police Cost (Officer) $85.00 Per Hour/Officer Police Officer Presence Required $138.91 1% $138.00 $53 5 Police Cost (Sergeant) New Per Hour/Sergeant Police Sergeant Presence Required $183.97 1% $183.00 NA 6 Daily Parking Permit (Rooftop Only) $500.00 Per Day Roof Top Reservation $576.92 0% $575.00 $757 Public Works Encroachment Permit See Engineering Fees NA NA See Engineering Fees NA 8 Fire Department Cost Estimate See LA County Fire Fee Schedule NA NA See LA County Fire Fee Schedule NA 9 Additional Fee per Day New Per Day Each Day After 1st Film Day $662.15 22% $517.00 NA Exhibit
A

Page 401 of 445 ends

ENGINEERING FEES
# Title Current Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ 1 Miscellaneous Plan Check $200.00 per review $431.72 0% $431.00 $2312 Miscellaneous Inspection $110.00 per hour, per inspection $430.44 0% $430.00 $3203 Administrative Conditional Use Permit - Major Activity Event Review $600.00 $1,015.29 0% $1,015.00 $4154 Administrative Conditional Use Permit - Minor Activity Event Review $200.00 $726.63 0% $726.00 $5265 Curb & Gutter (Repair or Replacement) - 250LF & Under $305.00 Under 250LF $990.21 0% $990.00 $6856 Curb and Gutter Plan Review (Plan Check & Inspection) 6% of Construction Cost 3% for Plan Review and 3% for Inspection NA NA 6% of Construction Cost $0 7 Curb Drain (4" Core Drill) - 200LF & Under $230.00 $990.21 0% $990.00 $7608 Residential Driveway, New or Modification $319.00 Per Approach $1,081.84 0% $1,081.00 $762 9 Encroachment Permit - Lane Closure Only (Traffic Control Per Week or Less and Per Location) $265.00 $990.21 0% $990.00 $725 10 Encroachment Permit - Roll-Off Bins, Per Week or Any Portion Thereof $163.00 $183.26 0% $183.00 $20 11 Final Tract Map - Plan Check - Residential (3 Plan Checks) $2,500.00 + $60/Lot Including Record Map Analysis, Monument Review, Condition Verification, Map Clearance $6,141.59 2% $6,000.00 $3,500
12 Lot Line Adjustment - Residential or Commercial $1,665.00 $1,720.62 0% $1,720.00 $5513 Excavation - Up to 500 SF $1,550.00 $791.90 0% $791.00 -$759 14 Precise Grading Plan - 500 SF or Greater
14 Plan Check $200.00 per hour $823.23 3% $800.00 $600
14 Inspection $110.00 per hour $338.81 3% $330.00 $22015 Rough Grading Plan - 500 SF or Greater 14 Plan Check $200.00 per hour $823.23 3% $800.00 $600
14 Inspection $110.00 per hour $338.81 3% $330.00 $22016 Sewer Plan Review (Plan Check & Inspection) 6% of Construction Cost 3% for Plan Review and 3% for Inspection NA NA 6% of Construction Cost $0 17 Storm Drain Plan Review (Plan Check & Inspection) 6% of Construction Cost 3% for Plan Review and 3% for Inspection NA NA 6% of Construction Cost $018 Street Plan Review (Plan Check & Inspection) 6% of Construction Cost 3% for Plan Review and 3% for Inspection NA NA 6% of Construction Cost $019 Street Vacation (Plus Consultant Costs) $1,189.00 $1,322.83 0% $1,322.00 $13320 Tree Installation - Furnish and Plant 15-Gallon Tree with Root Barrier (Contracted Service) $254.00 WCA Contract Price $275.00 0% $275.00 $21 21 Tree Installation - Furnish and Plant 24" Box Tree with Root Barrier (Contracted Service) $394.00 WCA Contract Price $495.00 0% $495.00 $101 22 Tree Installation - Furnish and Plant 36" Box Tree with Root Barrier (Contracted Service) $994.00 WCA Contract Price $1,200.00 0% $1,200.00 $206 23 Water Plan Review (Plan Check & Inspection) 6% of Construction Cost 3% for Plan Review and 3% for Inspection NA NA 6% of Construction Cost $0 24 Wide Load Permits (Per Trip, Per California DOT) $16.00 NA NA $16.00 $025 Trench Cut Fee New New fee, per consultant study. Consultant to provide calculation. NA NA Based on PCI calculation NA 26 Commercial Driveway Approach Modification $319.00 Per Approach $818.25 0% $818.00 $499.00 27 Curb & Gutter (Repair or Replacement) - 250LF-500LF $305.00 250LF-500LF $1,006.48 0% $1,006.00 $701.00 28 Curb & Gutter (Repair or Replacement) - Per Additional $50LF - 1 Hour/Additional 50 linear ft of insp time. $305.00 Per Additional $50 LF $1,292.58 0% $1,292.00 $987.00 29 Residential Driveway Approach Modification $319.00 Per Approach $720.38 0% $720.00 $401.00 30 Sidewalk - Under 500SF New Under 500SF $720.38 0% $720.00 NA 31 Sidewalk - 500SF-1000SF New 500SF-1000SF $1,006.48 0% $1,006.00 NA32 Sidewalk - Over 1000SF New Over 1000SF $1,292.58 0% $1,292.00 NA Exhibit
A

Page 402 of 445 ends

ENGINEERING FEES
# Title Current Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ 33 Curb Drain (4" Curb Drill) - 250LF - 500LF $230.00 250LF - 500LF $1,006.48 0% $1,006.00 $776.00 34 Curb Drain Box Culvert $230.00 $720.38 0% $720.00 $490.0035 AC Paving (Under 500 SF) New Under 500SF $720.38 0% $720.00 NA36 AC Paving (500SF - 1000SF) New 500SF-1000SF $1,006.48 0% $1,006.00 NA 37 AC Paving (Over 1000 SF) New Over 1000SF $1,292.58 0% $1,292.00 NA38 PCC Paving (Under 500 SF) New Under 500SF $720.38 0% $720.00 NA 39 PCC Paving (500SF - 1000SF) New 500SF-1000SF $1,006.48 0% $1,006.00 NA40 PCC Paving (Over 1000 SF) New Over 1000SF $1,292.58 0% $1,292.00 NA 41 Excavation (500SF-1000SF) $1,550.00 500SF-1000SF $1,006.48 0% $1,006.00 -$544.00 42 Excavation (Over 1000SF) $1,550.00 Over 1000SF $1,292.58 0% $1,292.00 -$258.0043 Lane Closure - Residential Street $265.00 Per Week or Less, Per Location
$720.38 0% $720.00 $455.00
44 Lane Closure - Collector Street $265.00
Per Week or Less, Per Location
$720.38 0% $720.00 $455.00
45 Lane Closure - Arterial Street $265.00
Per Week or Less, Per Location
$720.38 0% $720.00 $455.00
46 Street Closure - Residential Street $265.00 Per Day $720.38 0% $720.00 $455.0047 Street Closure - Collector Street $265.00 Per Day $720.38 0% $720.00 $455.0048 Street Closure - Arterial Street $265.00 Per Day $720.38 0% $720.00 $455.0049 After Hours Insepction New Per Hour $306.21 0% $306.00 NA 50 Encroachment (Access to ROW, non-construction) $320.00 $621.22 0% $621.00 $301.0051 Consultant Costs Actual Cost NA NA Actual Cost $0.00 52 Final Tract Map Plan Check - Commercial, Fourth & Each Subsequent Check Submittal New per review Fourth & Each Subsequent Check Submittal $431.72 0% $431.00 NA 53 Tentative Tract Map - Residential/Commercial (3 Plan Checks) $1,250.00 + $100 Per each land, and/or air lot/unit
$1,288.90 1% $1,280.00 $30.00
54 Final Parcel Map Plan Check - Residential/Commercial $2,500.00 + $100 Per each land, and/or air lot/unit
$1,819.78 0% $1,819.00 -$681.00
55 Tentative Parcel Map Plan Check - Residential/ Commercial $2,500.00 + $100 Per each land, and/or air lot/unit
$1,819.78 0% $1,819.00 -$681.00
Exhibit
A

Page 403 of 445 ends

WATER FEES
# Title Current Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ 1 Additional Fee If Customer Has Self-Restored $162.00 $215.09 0% $215.00 $53 2 Broken Lock/Damage (Plus Cost of Lock) $69.00 Actual Costs to be compiled depending on equipment/repairs that are needed. $215.09 0% $215 + Actual Repair Costs $146 3 Delinquent Account Field/Office Notification Fee $31.00 $75.86 1% $75.00 $44 4 Deliquent Reconnect Fee - After Hours $120.00 Minimum 3 Hours Call Back Time per MOU $412.25 9% $375.00 $2555 Deliquent Reconnect Fee - Same Day New $156.68 4% $150.00 NA 6 Deliquent Reconnect Fee - Next Business Day $81.00 $156.68 17% $130.00 $497 Late Payment Charge 10% of Delinquent Balance NA NA 10% of Delinquent Balance $0 8 Each Additional Set and Removal $41.00 $146.74 1% $146.00 $105 9 Fire Flow Availability $240.00 $476.05 0% $476.00 $236 10 Initial Fire Hydrant Meter/Construction Meter Fee $80.00 $229.99 0% $229.00 $149 11 Initial Service Turn On - After Hours $120.00 Minimum 3 Hours Call Back Time per MOU $437.10 60% $175.00 $55 12 Meter Re-Read $37.00 $90.76 1% $90.00 $53
13 Meter Set (Plus Actual Cost) $103.00 Actual Costs to be compiled depending on equipment/repairs that are needed. $229.99 0% $229.00 $12614 Multi-Unit Delinquent Account Field Notification (Per Unit) $4.00 per unit In Addition to #3 above $9.94 9% $9.00 $5 15 Pressure Test $76.00 $131.83 1% $131.00 $55
16 Service Line Install - 1" or 2" (Plus Actual Cost) $399.00 NA NA $4,000 Deposit for 1", $6,000 Deposit for 2" - Will Only Charge Actual Costs (Labor & Material) Variable
17 Meter Connection (Downgrade/Upgrade Meters) - 5/8" to 1", 1" to 3/4", 1- 1/2" to 1", 2" to 1". $150.00 + $76/Hr Actual Costs to be compiled depending on equipment/repairs that are needed. NA NA $1,000 Deposit - Will Only Charge Actual Costs (Labor & Material) Variable18 Trip Charge for Additional Field Visit $95.00 $141.77 1% $141.00 $46 19 Trip Charge for Additional Field Visit - After Hours New $397.34 0% $397.00 NA20 Turn On & Off Water Service Customer Repair $88.00 $141.77 1% $141.00 $5321 Turn On & Off Water Service Customer Repair After Hours $120.00 Minimum 3 Hours Call Back Time per MOU $397.34 0% $397.00 $27722 Water Meter Test $112.00 $517.77 0% $517.00 $405 Exhibit
A

Page 404 of 445 ends

ENVIRONMENTAL FEES
# Title
Current
Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Unit Notes Fee Δ 1 C&D Admin Review Large Tenant Improvements, Multifamily, Commercial/Industrial and Other Projects (Non-Refundable) TBD New Ordinance required to set fees. $168.66 5% $160.00 flat fee per project Fee established by Ordinance CC18-03 and original fee set by Resolution CC18-14 NA 2 C&D Admin Review Mid-Sized Tenant Improvements, Single Family Residential New Construction (Non-Refundable) TBD New Ordinance required to set fees. $134.93 7% $125.00 flat fee per project Fee established by Ordinance CC18-03 and original fee set by Resolution CC18-14 NA3 C&D Admin Review Small Tenant Improvements and Residential Additions (Non-Refundable) TBD New Ordinance required to set fees. $101.19 11% $90.00 flat fee per project Fee established by Ordinance CC18-03 and original fee set by Resolution CC18-14 NA 4 C&D Diversion Plan Additional Review or Verification (Per Hour) TBD New Ordinance required to set fees. $337.32 3% $327.00 per hour Fee established by Ordinance CC18-03 and original fee set by Resolution CC18-14 NA5 C&D Performance Security Deposit (Refundable, $30,000 Maximum) TBD New Ordinance required to set fees. NA NA 3% of project value up to the first $100,000. 2% of the next $400,000. 1% of the next $500,000. 0.25% for any amount over $1,000,000. flat fee determined by project valuation
Fee established by Ordinance CC18-03 and fee
set by Resolution CC18-14 NA
6 Hazardous Material/Illicit Discharge/Sewer Overflow Response During Non-Business Hours & Holidays (Staff time + Materials) Acutal Costs Based on OT Rate Actual costs based on staff costs to respond and remediate discharge, materials used, disposal costs, contractor cost (if engaged by City) and Admin Cost (25%) NA NA
Actual Costs Based on OT Rate + Materials
per incident
Actual costs based on: staff time to respond and remediate discharge, materials used, disposal costs, and contractor cost (if engaged by City) $0
7 Hazardous Material/Illicit Discharge/Sewer Overflow Response During Regular Business Hours (Staff time + Materials) Actual Costs Based on FBR Actual costs based on staff costs to respond and remediate discharge, materials used, disposal costs, contractor cost (if engaged by City) and Admin Cost (25%) NA NA
Actual Costs Based on FBR + Materials
per incident
Actual costs based on: staff time to respond and remediate discharge, materials used, disposal costs, and contractor cost (if engaged by City) $0
8 If Resident Found To Have Discharged Pool Without Pool Discharge Permit (Per Incident) $57.00 per inspection Staff time to do Chlorine test = 1/2 hr MAT = $57.47 $168.66 5% $160.00 per incident City staff time to do inspection and/or notification. Staff = PWM, 0.5 hrs @ $327/hr = $163.75. $103 9 Illegal Rolloff Impound Fee (Penalty) $500.00 NA NA $500.00 per incident Impound Fee $0 10 LID Plan Review $2,000.00
LID Review (10 hrs from first review to approval, with engineer versed in LID, however revisions and additional meetings are typicially required (+2 hrs)) JLHA $135 x 10 hrs + Admin Cost (25%) = $1,687.50 or JLHA $135 x 12 hrs + Admin Cost (25%) = $2025; JLHA is recommending $2,000 deposit + actual costs at $169/hr if project requires more than 12 hours of review.

NA NA $2,750.00 per project
LID Plan review takes JLHA an average of 18 hrs from first review to approval. Include 1 hr for city staff time. Staff = JLHA, 18 hrs @ $135/hr = $2,430Staff = City, PWM 1 hr @ $327/hr = $327 $750
11 Maintenance Covenant Processing $203.55
Applicant provides Covenant; staff reviews, CM signs, returns 4 copies (CC, JLHA, ES). Not incorporated into LID Review. $198.66 0% $198.00 per project
City staff time for processing + cost of recording.Staff = PWM, 0.5 hrs @ $327/hr = $163.75LA County Recorder = $30 -$6
12 Mobile Washing Equipment/Inspection (Per Inspection) (At Business License Review) $89.00 per inspection Staff = 1/2 MAT($57.47) + 1/4 SAT ($31.28) = $88.75 $101.19 0% $101.00 per inspection City staff time to perform an inspection of the mobile equipment. Staff = PWM, 0.3 hrs @ $327/hr = $98. $12 13 No Fee - Resident Attends Workshop and Receives a free+ Compost Bin $0.00 $72 subsidized by AB 939 fee (source reduction) $72.00 100% $0.00 per bin Cost of compost bin ($72) is subsidized by IWM fee to encourage source reduction $0 14 Non-Resident Wants to Purchase Compost Bin and Other Item Sale $72.00 Straight Cost incl. tax $72.00 0% $72.00 per item Straight Cost, including tax $0 15 NPDES - Environmental Compliance Fee (Per Year, Charged to All Non Home-Based Businesses with New Business License Application and with Annual Renewal) $15.00
Staff has not tacked costs; Recommend leave at $15 and track over next year to get better handle on actual costs incurred to justify raising fee.

NA NA $15.00 per year $0
16 NPDES Construction Site Inspection - Violation Follow-Up (Per Incident) (Consultant Costs for Inspection + City Staff Time to Issue NOV) $334.00 per inspection Actual Costs - JLHA ($128/hr) + 1/4 EST ($50.06) + 1/2 MAT ($57.47) + 1/4 SAT ($31.28) x Admin Cost (25%) = $333.51 $371.94 0% $371.00 per inspection Inspection takes JLHA 1 hr. Include 0.5 hr for City staff time. $3717 NPDES Construction Site Inspection (Per Inspection) (Min of 1 Per Quarter During Active Construction for Length of Project) $160.00 per inspection Actual Costs - JLHA ($128/hr) x Admin Cost (25%) = $160.00 Ask contractor for estimated construction time and multiply by number of months anticipated. $203.28 2% $200.00 per inspection Inspection takes JLHA 1 hr. $40 18 NPDES Permit "No Exposure" or "Non-Applicability" or Other Certification Verification/Correction (Per Business) (Actual Staff Time) $139.00 per hour Staff = 1/2 MAT($57.47) + 1/4 SAT ($31.28) + 1/4 EST (50.06) = $277.62 (Round up) = $138.82 $270.30 0% $270.00 per business Consultant and City Staff time to bring business into compliance with NPDES permit.Include 0.5 hrs for JLHA and 0.5 hrs for City staff. $131
Exhibit
A

Page 405 of 445 ends

ENVIRONMENTAL FEES
# Title
Current
Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Unit Notes Fee Δ 19 NPDES Permit Inspection - Commercial/Industrial Storm Water Inspection(Per Year, Charged with New Business License Application and with Annual Renewal) $63.00
Actual Costs - 2 - JLHA ($125) inspections x Admin Cost (25%)/5 (inspection every 2 years - split annually) $62.50 $135.00 50% $68.00 per inspection
JLHA cost is $135/inspection. An inspection is performed every 2 years. This fee is charged to businesses that get SW inspections only, and no IW inspections.$135/2 = $68 per year. $5
20 Plan Review (Per Review) Staff Time $133.00 per hour Staff = 3/4 ESA($101.39) + 1/4 SAT ($31.28) = $132.67 $168.66 0% $168.00 per review City staff time to review development plans. Staff = PWM, 0.5 hrs @ $327/hr = $164 $3521 Pool Drainage Permit $0.00 per inspection No Fee NA NA $0.00 per permit No fee for issuance of a pool drainage permit. $0 22 Post Installation BMP Inspections (2 Inspections Required per Project) $160.00 per inspection Actual Costs - JLHA ($128/hr) X Admin Cost (25%) = $160.00 $1,219.71 2% $1,200.00 per project JLHA performs 2 inspections, one before backfill and one at project completion, 3 hrs per inspection. $1,04023 Recycling Permit Fee (Per Year) $30.00 per year Amount charged to recyclers (fee for service); Added to business licence (e-waste & women's club recycling) $30.00 0% $30.00 per year
Amount charged to recyclers (fee for service). Added to business license (e-waste recyclers, CRV recyclers, etc.) $0
24 Resident Does Not Attend Workshop. Wants to Purchase Compost Bin and Other Item Sale $40.00 $32 subsidized by AB 939 fee (source reduction) $72.00 44% $40.00 per bin $40 paid by resident.$32 is subsidized by IWM fee (to encourage source reduction).$72 is the total cost per compost bin. $0
25 Water Quality Sampling of Illicit Discharge (Per Sampling Event) Actual Costs + 25% Admin Fee Actual cost for lab analysis + Admin Cost (25%) NA NA Actual Costs Based on FBR + Materials per incident Actual costs based on: sampling, lab analysis, and City staff time. $0 Exhibit
A

Page 406 of 445 ends

INDUSTRIAL WASTE FEES
# Title
Current
Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Unit Notes Fee Δ 1 Site-Remediation Investigation (Staff Time) $79.00 per hour $246.71 1% $245.00 per hour $166 2 Industrial Waste Annual Inspection Fee - Class A (Per Year, Charged with New Business License Application and with Annual Renewal) $226.00 per inspection $148.00 0% $148.00
For Class A, JLHA performs inspections for Storm Water (every 2 yrs) and for IW/FOG (1x/ yr).Year 1 = Combo, SW + IW/FOG inspection = $160. Year 2 = IW/FOG inspection only = $135.$295 every two years, $148 per year. -$78
3 Industrial Waste Annual Inspection Fee - Class B (Per Year, Charged with New Business License Application and with Annual Renewal) $451.00 per inspection $283.00 0% $283.00
For Class B, JLHA performs inspections for Storm Water (every 2 yrs) and for IW/FOG (2x/yr).Year 1 = Combo, SW + IW/FOG inspection ($160), IW/FOG inspection ($135) = $295. Year 2 = Two IW/FOG inspections ($135 ea) = $270.$565 every two years, $283 per year. -$168
4 Industrial Waste Annual Inspection Fee - Class C (Per Year, Charged with New Business License Application and with Annual Renewal) $676.00 per inspection $418.00 0% $418.00
For Class C, JLHA performs inspections for Storm Water (every 2 yrs) and for IW/FOG (3x/yr).Year 1 = Combo, SW + IW/FOG inspection ($160), IW/FOG inspection ($135), IW/FOG inspection ($135) = $430. Year 2 = Three IW/FOG inspections ($135 ea) = $405.$835 every two years, $418 per year. -$258
5 Industrial Waste Annual Inspection Fee - Class D (Per Year, Charged with New Business License Application and with Annual Renewal) $901.00 per inspection $553.00 0% $553.00
For Class D, JLHA performs inspections for Storm Water (every 2 yrs) and for IW/FOG (4x/yr).Year 1 = Combo, SW + IW/FOG inspection ($160), IW/FOG inspection ($135), IW/FOG inspection ($135), IW/FOG inspection ($135) = $565. Year 2 = Four IW/FOG inspections ($135 ea) = $540.$1,105 every two years, $553 per year. -$348
6 Review of Site-Remedial Investigation and Clean- Up Plan (Per Hour) $313.00 $337.32 0% $337.00 per hour $24 7 Wastewater Sampling and Analysis (Per Sampling Event) $226.00 NA NA Actual costs based
on: sampling, lab analysis, and city staff time.
per incident NA
Exhibit
A

Page 407 of 445 ends

PARKS & RECREATION FEES
# Title
Current
Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Unit Fee Δ 1 Lap Swim $5.00 per person per entry NA NA $5.00 per person per entry $0 2 Leaders-in-Training $55.00 per program period NA NA $55.00 $03 Youth Sports Program $57.00 1 day per week/6 weeks NA NA $8.00-$12.00* per person per day Variable4 Parade Entry - Band $105.00 NA NA $110.00 $5 5 Parade Entry - Commercial $150.00 NA NA $160.00 $106 Parade Entry - General $55.00 NA NA $60.00 $5 7 Group Swim Lessons $58.00 5 Days, 40 Minutes Per Day NA NA $12.00-$17.00* per person per day Variable8 Semi-Private Swim Lessons $125.00 5 Days, 40 Minutes Per Day NA NA $20.00-$30.00* per person per day Variable 9 Private Swim Lessons $90.00 5 Days, 40 Minutes Per Day NA NA $30.00-$35.00* per person per day Variable 10 Swim Team $192.00 10 Weeks, 4 Days Per Week, Including Meets NA NA $6.00-$10.00* per person per day Variable 11 Senior Special Events $20.00 NA NA $10.00-$30.00* per person Variable12 Senior Monthly Dance $5.00 NA NA $5.00-$10.00* per person Variable13 Senior Fitness Center Orientation $10.00 NA NA $10.00 per person $0 14 Day Trips $40.00 average per person per trip NA NA $10.00-$200.00* per person per trip Variable15 Classes $50.00 average per person per class NA NA $10.00-$300.00* per person per session Variable 16 Summer and Spring Day Camp $170.00 per person per week NA NA $35.00-$45.00* per person per day Variable17 Athletic Fields Security Deposit $200.00 NA NA $200.00 $0 18 Covina Park Softball Field for Covina-Based Nonprofit Organization, Covina Business or Covina Resident 7am-5pm / 5pm-10pm methodology change19 Up to 50 people $60/$75 2-Hour Period NA NA $50.00 per hour Variable 20 Over 50 people $60/$75 2-Hour Period NA NA $75.00 per hour Variable 21 Covina Park Softball Field for Non-Covina-Based Nonprofit, Non-Covina Business or Nonresident 7am-5pm / 5pm-10pm methodology change22 Up to 50 people $80/$105 2-Hour Period NA NA $75.00 per hour Variable 23 Over 50 people $80/$105 2-Hour Period NA NA $100.00 per hour Variable 24 Hollenbeck Park Sports Field for Covina Based Nonprofit Organization, Covina Business or Covina Resident 7am-5pm / 5pm-10pm methodology change25 Up to 50 people $60/$75 2-Hour Period NA NA $50.00 per hour Variable 26 Over 50 people $60/$75 2-Hour Period NA NA $75.00 per hour Variable27 Hollenbeck Parks Sports Field for Non-Covina Based Nonprofit, Non- Covina Business or Nonresident 7am-5pm / 5pm-10pm methodology change28 Up to 50 people $80/$105 2-Hour Period NA NA $75.00 per hour Variable 29 Over 50 people $80/$105 2-Hour Period NA NA $100.00 per hour Variable 30 Sunkist Park Grass Area for Covina Based Nonprofit Organization, Covina Business or Covina Resident 8am - Dusk methodology change31 Up to 50 people $50.00 2-Hour Period NA NA $50.00 per hour Variable 32 Over 50 people $50.00 2-Hour Period NA NA $75.00 per hour Variable33 Sunkist Park Grass Area for Non-Covina Based Nonprofit, Non-Covina Business or Nonresident 8am - Dusk methodology change34 Up to 50 people $65.00 2-Hour Period NA NA $75.00 per hour Variable35 Over 50 people $65.00 2-Hour Period NA NA $100.00 per hour Variable 36 Wingate Park Grass Area for Covina Based Nonprofit Organization, Covina Business or Covina Resident 8am - Dusk methodology change37 Up to 50 people $50.00 2-Hour Period NA NA $50.00 per hour Variable 38 Over 50 people $50.00 2-Hour Period NA NA $75.00 per hour Variable39 Wingate Park Grass Area for Non-Covina Based Nonprofit, Non-Covina Business or Nonresident 8am - Dusk methodology change40 Up to 50 people $50.00 2-Hour Period NA NA $50.00 per hour Variable41 Over 50 people $50.00 2-Hour Period NA NA $75.00 per hour Variable42 Covina Park Softball Field Light Use $25.00 per hour NA NA $30.00 per hour $543 Hollenbeck Park Light Use $33.00 per hour NA NA $35.00 per hour $2 44 Roller Hockey/Skating Rinks (2-hour period) $75.00 per 2-hour period NA NA $50.00 per hour Variable 45 Security Deposit (Recreation Hall, Teen Center, Cougar Park Community Center) $300.00 NA NA $300.00 $046 Sanitation and Setup/Clean up Fee (Recreation Hall, Teen Center, Cougar Park Community Center) $100.00 $102.85 3% $100.00 $0 Exhibit
A

Page 408 of 445 ends

PARKS & RECREATION FEES
# Title
Current
Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Unit Fee Δ 47 Recreation Hall Use for Covina-Based Nonprofit Organization, Covina Business or Covina Resident $150.00 per hour NA NA $150.00 per hour $048 Recreation Hall Use for Non-Covina-Based Nonprofit, Non-Covina Business or Nonresident $175.00 per hour NA NA $175.00 per hour $049 Cougar Park Community Center Use for Covina-Based Nonprofit Organization, Covina Business or Covina Resident $150.00 per hour NA NA $150.00 per hour $050 Cougar Park Community Center Use for Non-Covina-Based Nonprofit, Non-Covina Business or Nonresident $175.00 per hour NA NA $175.00 per hour $051 Teen Center Use $50.00 per hour Assembly: 40 NA NA $60.00 per hour $1052 Security Deposit for Covina Park Bandshell or Heritage Plaza $200.00 NA NA $200.00 $0 53 Covina Park Bandshell Use for Covina-Based Nonprofit Organization, Covina Business or Covina Resident $175.00 2-Hour Period NA NA $125.00 per hour -$50 54 Covina Park Bandshell Use for Non-Covina-Based Nonprofit, Non-Covina Business or Nonresident $200.00 2-Hour Period NA NA $150.00 per hour -$50 55 Heritage Plaza Platform for Covina-Based Nonprofit Organization, Covina Business or Covina Resident $125.00 2-Hour Period NA NA $100.00 per hour -$25 56 Heritage Plaza Platform for Non-Covina-Based Nonprofit, Non-Covina Business or Nonresident $150.00 2-Hour Period NA NA $125.00 per hour -$25 57 Senior and Community Center Security Deposit $400.00 NA NA $400.00 $058 Senior and Community Center Use for Covina-Based Nonprofit Organization, Covina Business or Covina Resident $225.00 per hour NA NA $225.00 per hour $059 Senior and Community Center Use for Non-Covina-Based Nonprofit, Non- Covina Business or Nonresident $300.00 per hour NA NA $300.00 per hour $060 Senior and Community Center Sanitation and Setup/Clean up Fee $140.00 $143.42 2% $140.00 $061 Library Community Room Use $30.00 per hour NA NA $60.00 per hour $30 62 Community Garden Annual Use Fees63 Cougar Park Community Garden Large Parcel or Handicap Accessible Parcel $50.00 per parcel annually Annual Period of January 1 - December 31. Fees will be prorated by 50% for applicants approved July 1 - November 1 of an annual period.

NA NA $50.00 per parcel annually $0
64 Cougar Park Community Garden Small Parcel $44.00 per parcel annually Annual Period of January 1 - December 31. Fees will be prorated by 50% for applicants approved July 1 - November 1 of an annual period.

NA NA $44.00 per parcel annually $0
Exhibit
A

Page 409 of 445 ends

LIBRARY FEES
# Title Current Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ 1 Computer Printout Per Page $0.15 per page $1.15 78% $0.25 $0.102 Computer Printouts Color - Per Page $0.50 per page $1.20 58% $0.50 $0 3 Library Late Charges - Books Per Day (Penalty) $0.25 Also includes audiobooks and magazines NA NA $0.25 $0 4 Library Late Charges - DVDs Per Day (Penalty) $1.00 NA NA $1.00 $0 5 Lost/Damage Book Fees $4.00 plus Actual Material Replacement Cost NA NA Actual Replacement Cost -$4 6 Lost/Damage Cases for DVD $4.00 plus Actual Material Replacement Cost NA NA Actual Replacement Cost -$47 Lost/Damage DVD $4.00 plus Actual Material Replacement Cost NA NA Actual Replacement Cost -$48 Lost/Damage Magazines $4.00 plus Actual Material Replacement Cost NA NA Actual Replacement Cost -$4 Exhibit
A

Page 410 of 445 ends

BUILDING FEES
# Title
Current
Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ 1 Standard Hourly Rate (ENV) $133.00 $212.63 0% $212.00 $79 2 Antenna Equipment Container $397.90 $402.08 0% $402.00 $43 Antenna (0-30 Ft) $397.90 $459.98 0% $459.00 $61 4 Antenna (31+ Ft) $489.90 $566.33 0% $566.00 $76
5 Cellular/Mobile Phone, Co-Location $336.95 $389.52 0% $389.00 $52 6 Cellular/Mobile Phone, Free-Standing $336.95 $389.52 0% $389.00 $527 Address Verification Actual Cost NA NA Actual Cost $0 8 Archive Fee 2% of Permit Value 3.3% 8% 3% of Permit Value 1.0% 9 Scanning Fee New per sheet NA NA Actual Cost NA
10 Plan Maintenance Fee New $48.09 0% $48.00 NA11 Appeal of Abatement Notice $266.00 $307.50 0% $307.00 $4112 Awning or Canopy $230.00 $265.88 0% $265.00 $3513 Balcony Addition $230.00 $265.88 0% $265.00 $3514 Carport $198.95 $229.99 0% $229.00 $3015 Carport (with Calcs) $276.00 $319.06 0% $319.00 $4316 Change of Occupancy $290.95 $336.34 0% $336.00 $4517 Close Existing Openings:18 Exterior Wall $230.00 $265.88 0% $265.00 $3519 Interior Wall $230.00 $265.88 0% $265.00 $3520 Commercial Coach $280.00 per unit $323.68 0% $323.00 $4321 Code Compliance Inspections/Reinspection $290.95 $336.34 0% $336.00 $4522 Covered Porch $230.00 $265.88 0% $265.00 $35 23 Deck (Wood) $184.00 $212.71 0% $212.00 $28
24 Deck (Wood) (with Calcs) $230.00 $265.88 0% $265.00 $3525 Demolition $290.95 $336.34 0% $336.00 $45 26 Door:27 New Door (Non Structural) $213.90 $247.27 0% $247.00 $3328 New Door (Structural Shear Wall/Masonry) $290.95 $336.34 0% $336.00 $45 29 Fence of Freestanding Wall (Non-Masonry)30 Up to 10 feet in height (first 100 LF) $186.00 $215.02 0% $215.00 $29 31 Each Additional 100 LF $67.00 $77.45 1% $77.00 $10
32 Over 10 Feet in Height (First 100 LF) $226.00 $261.26 0% $261.00 $35 33 Over 10 Feet in Height (First 100 LF with Calcs) $280.00 $323.68 0% $323.00 $4334 Each Additional 100 LF $133.00 $153.75 0% $153.00 $20 35 Fence of Freestanding Wall (Masonry)36 Over 3 Feet Up to 6 Feet High (First 100 LF) $186.00 $215.02 0% $215.00 $2937 Each Additional 100 LF $67.00 $77.45 1% $77.00 $10 38 Special Design (6-10' High) $253.00 $292.47 0% $292.00 $3939 Each Additional 100 LF $107.00 $123.69 1% $123.00 $16 40 Special Design (Over 10' High) $320.00 $369.93 0% $369.00 $49 Exhibit
A

Page 411 of 445 ends

BUILDING FEES
# Title
Current
Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ 41 Each Additional 100 LF $133.00 $153.75 0% $153.00 $20 42 Fireplace: Masonry $213.90 $247.27 0% $247.00 $33
43 Fireplace: Masonry (with Calcs) $290.95 $336.34 0% $336.00 $45 44 Fireplace: Pre-Fabricated/Metal $322.00 $372.24 0% $372.00 $5045 Flag Pole (Over 30 Feet in Height) $184.00 $212.71 0% $212.00 $2846 Garage (detached)47 Wood frame Up to 1,000 SF $368.00 $425.41 0% $425.00 $5748 Each Wood Frame <1,000 SF $73.60 per 100 SF $85.08 0% $85.00 $1149 Masonry up to 1,000 SF $520.95 $602.23 0% $602.00 $81 50 Each Masonry <1,000 SF $104.19 per 100 SF $120.45 0% $120.00 $1651 Greenhouse (Non-Commercial) $184.00 $212.71 0% $212.00 $2852 Greenhouse (Non-Commercial) (with Calcs) $244.95 $283.17 0% $283.00 $38 53 Lighting Pole $198.95 $229.99 0% $229.00 $3054 Each Additional Pole $53.00 $61.27 0% $61.00 $855 Mobile Home $322.00 $372.24 0% $372.00 $50 56 Mobile Home, Double Wide $443.90 $513.16 0% $513.00 $69 57 Partition - Commercial, Interior (Up to 30 LF) $259.90 $300.45 0% $300.00 $40 58 Additional Partition (Each 30 LF) $123.05 $142.25 0% $142.00 $1959 Partition - Residential, Interior (Up to 30 LF) $213.90 $247.27 0% $247.00 $33 60 Additional Partition (Each 30 LF) $67.00 $27.90 (for 31 lf - 60 lf), $77.00 (for 60 lf & over) $77.45 1% $77.00 $10 61 Patio Cover62 Wood Frame (Up to 300 SF) $213.90 $247.27 0% $247.00 $3363 Wood Frame (Up to 300 SF with Calcs) $290.95 $336.34 0% $336.00 $4564 Metal Frame (Up to 300 SF) $184.00 $212.71 0% $212.00 $2865 Other frame (Up to 300 SF) $213.90 $247.27 0% $247.00 $3366 Additional Patio (Up to 300 SF) $92.00 $106.35 0% $106.00 $1467 Enclosed (Up to 300 SF) $184.00 $212.71 0% $212.00 $28 68 Enclosed, Wood Frame (Up to 300 SF with Calcs) $230.00 $265.88 0% $265.00 $3569 Enclosed, Metal Frame (Up to 300 SF) $213.90 $247.27 0% $247.00 $33 70 Enclosed, Metal Frame (Up to 300 SF with Calcs) $244.95 $283.17 0% $283.00 $3871 Enclosed, Other Frame (Up to 300 SF) $276.00 $319.06 0% $319.00 $4372 Additional Enclosed Patio (Each 300 SF) $106.95 $123.64 1% $123.00 $16 73 Photovoltaic System-(stand alone) $305.90 Per KWh $353.63 0% $353.00 $4774 Pile Foundation:75 Cast in Place Concrete (First 10 Piles) $184.00 $212.71 0% $212.00 $2876 Additional Piles (Increments of 10) $92.00 $106.35 0% $106.00 $14 77 Driven (Steel, Pre-Stressed Concrete Up to 10) $213.90 $247.27 0% $247.00 $33 78 Additional Piles (Increments of 10) $92.00 $106.35 0% $106.00 $1479 Pre-Plan Inspection (First Hour) $152.95 $176.81 0% $176.00 $23 80 Pre-Plan Inspection (Each Additional Hour) $152.95 $176.81 0% $176.00 $2381 Additional Stucco Application (Each 400 SF) $31.05 $35.89 2% $35.00 $4 Exhibit
A

Page 412 of 445 ends

BUILDING FEES
# Title
Current
Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ 82 Stucco Applications (Up to 400 SF) $184.00 $212.71 0% $212.00 $2883 Relocated Building (Within 25 Miles of City Offices) $351.90 $406.80 0% $406.00 $5484 Each Additional 10 Miles (or Portion Thereof) $140.76 $162.72 0% $162.00 $2185 Retaining Wall (Concrete or Masonry):86 First 50 LF $213.90 $247.27 0% $247.00 $33 87 Additional Retaining Wall (Each 50 LF) $14.95 $17.28 2% $17.00 $2 88 Special Design, 3-10' High (Up to 50 LF) $322.00 $372.24 0% $372.00 $50 89 Additional Retaining Wall (Each 50 LF) $31.05 $35.89 2% $35.00 $4 90 Special Design, Over 10' High (Up to 50 LF) $382.95 $442.70 0% $442.00 $5991 Additional Retaining Wall (Each 50 LF) $46.00 $53.18 0% $53.00 $7 92 Gravity/Crib Wall (First 50 LF) $244.95 $283.17 0% $283.00 $3893 Additional Gravity/Crib Wall (Each 50 LF) $31.05 $35.89 2% $35.00 $4 94 Gravity/Crib Wall, Over 10' High (Up to 50 LF) $276.00 $319.06 0% $319.00 $4395 Additional Gravity/Crib Wall (Each 50 LF) $46.00 $53.18 0% $53.00 $7 96 Remodel - Residential:97 500 SF Single Story $276.00 $319.06 0% $319.00 $4398 Kitchen (More than 500 SF) $368.00 $425.41 0% $425.00 $5799 Additional Remodel (Garage Conversions - Each 500 SF) $77.05 not including ADU/habitable $89.07 0% $89.00 $12 100 Re-Roofing:101 Tile/Shake: (First 100 SF) $106.95 $123.64 1% $123.00 $16 102 Each Additional 100 SF $14.95 $17.28 2% $17.00 $2
103 Comp/Metal (First 100 SF) $92.00 $106.35 0% $106.00 $14 104 Each Additional 100 SF $14.95 $17.28 2% $17.00 $2
105 Roof Structure Replacement (Up to 100 SF) $184.00 $212.71 0% $212.00 $28106 Additional Roof Structure Replacement (Each 100 SF) $31.05 $35.89 2% $35.00 $4 107 Room Addition - First Story:108 Up to 500 SF $428.95 $495.87 0% $495.00 $66 109 Up to 500 SF (with Calcs) $460.00 $531.77 0% $531.00 $71110 Additional Room Addition (Over 500 SF) $138.00 $159.53 0% $159.00 $21111 Additional Room Addition (Over 500 SF with Calcs) $167.90 $194.10 0% $194.00 $26112 Room Addition - Multi-story:113 Up to 500 SF $460.00 $531.77 0% $531.00 $71114 Up to 500 SF (with Calcs) $397.90 $459.98 0% $459.00 $61115 Additional Room Addition (Over 500 SF) $138.00 $159.53 0% $159.00 $21116 Additional Room Addition (Over 500 SF with Calcs) $167.90 $194.10 0% $194.00 $26117 Sauna - Steam $276.00 $319.06 0% $319.00 $43 118 Sliding:119 Stone and Brick Veneer (Interior or Exterior - Up to 400 SF) $184.00 $212.71 0% $212.00 $28120 All Other (Up to 400 SF) $138.00 $159.53 0% $159.00 $21121 Additional Siding (Each 400 SF) $14.95 $17.28 2% $17.00 $2 122 Signs:

Exhibit
A

Page 413 of 445 ends

BUILDING FEES
# Title
Current
Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ 123 Permanent $184.00 $212.71 0% $212.00 $28124 Temporary $138.00 $159.53 0% $159.00 $21125 Directional $138.00 $159.53 0% $159.00 $21 126 Each Additional Directional Sign $31.05 $35.89 2% $35.00 $4127 Freeway Sign $397.90 $459.98 0% $459.00 $61 128 Freeway Sign with Master Plan $550.85 $636.79 0% $636.00 $85 129 Ground/Roof/Projecting Signs $276.00 $319.06 0% $319.00 $43130 Wall/Awning Sign, Non-Electric $123.05 $142.25 0% $142.00 $19 131 Wall, Electric $152.95 $176.81 0% $176.00 $23132 Skylight:133 Less Than 10 SF $167.90 $194.10 0% $194.00 $26134 Greater Than 10 SF or Structural $244.95 $283.17 0% $283.00 $38 135 Spa or Hot Tub (Pre-Fabricated) $138.00 $159.53 0% $159.00 $21 136 Stairs - First Flight $184.00 $212.71 0% $212.00 $28 137 Each Additional Flight $46.00 $53.18 0% $53.00 $7138 Storage Racks:139 0-8' High (Up to 100 LF) $152.95 $176.81 0% $176.00 $23140 Each Additional 100 LF $31.05 $35.89 2% $35.00 $4 141 Over 8' High (Up to 100 LF) $198.95 $229.99 0% $229.00 $30142 Each Additional 100 LF $46.00 $53.18 0% $53.00 $7 143 Street Address Change or Addition $395.00 $456.63 0% $456.00 $61144 Swimming Pool / Spa:145 Vinyl-Lined (Up to 800 SF) $322.00 $372.24 0% $372.00 $50 146 Fiberglass $336.95 $389.52 0% $389.00 $52147 Gunite - Custom and to Establish Master (Up to 800 SF) $550.85 $636.79 0% $636.00 $85148 Additional Pool (Over 800 SF) $92.00 $106.35 0% $106.00 $14149 Commercial Pool (Up to 800 SF) $474.95 $549.05 0% $549.00 $74150 Commercial Pool (Over 800 SF) $504.85 $583.61 0% $583.00 $78151 Temporary Utility Connection $152.95 $176.81 0% $176.00 $23152 Temporary Occupancy Certificate (30 day increment) $1,000.00 each Max of 3 total of 90 days. $1,156.02 0% $1,156.00 $156 153 Window or Sliding Glass Door:154 Window or Sliding Glass Door - 10) $152.95 $176.81 0% $176.00 $23 155 New Window (Non-Structural) (Each 10) $184.00 $212.71 0% $212.00 $28 156 New Window (Structural Shear Wall/Masonry) (Each 10) $213.90 $247.27 0% $247.00 $33 157 Bay Window (Structural) $244.95 $283.17 0% $283.00 $38158 Carnivals and Tents $184.00 $212.71 0% $212.00 $28 159 Underground Storage Tanks installation/removal $230.00 per tank $265.88 0% $265.00 $35160 ADA Ramps $184.00 $212.71 0% $212.00 $28 161 Research (first 1/2 hour) $172.50 $199.41 0% $199.00 $27162 Each additional 1/2 hour (or portion thereof) $86.25 $99.71 1% $99.00 $13163 Pre-Plan Inspection (first hour) $133.00 $153.75 0% $153.00 $20 Exhibit
A

Page 414 of 445 ends

BUILDING FEES
# Title
Current
Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ 164 Pre-Plan Inspection (additional hour) $133.00 $153.75 0% $153.00 $20165 Supplemental Plan Check Fee (@ Counter) $152.95 per hour $176.81 0% $176.00 $23166 Supplemental Inspection Fee (per hour) $152.95 $176.81 0% $176.00 $23 167 Change of Contractor $46.00 $53.18 0% $53.00 $7
168 Code Compliance Inspections/Reinspection $253.00 $292.47 0% $292.00 $39 169 Emergency (Non-Scheduled) Call-Out Fee (4 hours min) $611.80 $707.25 0% $707.00 $95170 After Hours (Scheduled) Call-Out Fee (2 hours min) $305.90 $353.63 0% $353.00 $47171 Each additional call-out hour $152.95 $176.81 0% $176.00 $23172 Re-Check Fee (first 1/2-hour) $86.25 $99.71 1% $99.00 $13173 Each additional 1/2 hour (or portion thereof) $75.00 $86.70 1% $86.00 $11174 Reinspection Fee (first 1/2 hour) $86.25 $99.71 1% $99.00 $13 175 Each additional 1/2 hour (or portion thereof) $75.00 $86.70 1% $86.00 $11176 Fire Safe Standards Review $152.95 (SRA - per hour) $176.81 0% $176.00 $23177 FEMA Flood Zone Review $152.95 per hour $176.81 0% $176.00 $23178 Soils Review (up to 1/2 hour) $86.25 $99.71 1% $99.00 $13 179 Special Inspector Application (new item) $51.05 $59.01 0% $59.00 $8180 Deed Restriction (up to 1/2 hour) $86.25 $99.71 1% $99.00 $13 181 Each additional 1/2 hour (or portion thereof) $86.25 $99.71 1% $99.00 $13 182 Travel and Documentation (standard) $41.40 $47.86 2% $47.00 $6 183 Travel and Documentation (additional trip) $41.40 $47.86 2% $47.00 $6184 Permit Issuance (B,M,E,P) $17.25 $72.13 0% $72.00 $55185 Reinspection Fee $133.00 per hour $153.75 0% $153.00 $20186 Mechancial187 Stand Alone Mechanical Plan Check $152.95 per hour $176.81 0% $176.00 $23188 A/C (Residential) $33.00 $38.15 0% $38.00 $5 189 Furnaces (F.A.U., Floor) $33.00 $38.15 0% $38.00 $5 190 Heater (Wall) $33.00 $38.15 0% $38.00 $5191 Appliance Vent / Chimney (Only) $22.00 $25.43 2% $25.00 $3 192 Refridgeration Compressor $27.00 $31.21 1% $31.00 $4 193 Boiler - up to 200k BTU $27.00 $31.21 1% $31.00 $4194 Boiler - greater than 200k BTU $40.00 $46.24 1% $46.00 $6 195 Chiller $33.00 $38.15 0% $38.00 $5
196 Fan Coil Unit $22.00 $25.43 2% $25.00 $3
197 Heat Pump (Package Unit) $53.00 $61.27 0% $61.00 $8198 Heater (Unit, Radiant, etc.) $22.00 $25.43 2% $25.00 $3 199 Air Handler w/ducts to 10k CFM $18.00 $20.81 4% $20.00 $2200 Air Handler w/ducts more than 10k CFM $27.00 $31.21 1% $31.00 $4201 Duct Work only $22.00 LF $25.43 2% $25.00 $3202 Evaporative Cooler $22.00 $25.43 2% $25.00 $3 203 Make-up Air System $22.00 $25.43 2% $25.00 $3204 Moisture Exhaust Duct (Clothes Dryer) $11.00 $12.72 6% $12.00 $1 205 Variable Air Volume Box (Including Duct Work) $18.00 $20.81 4% $20.00 $2 Exhibit
A

Page 415 of 445 ends

BUILDING FEES
# Title
Current
Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ 206 Vent Fan (Single Duct) $11.00 $12.72 6% $12.00 $1207 Vent System $27.00 $31.21 1% $31.00 $4208 Exhaust Hood and Duct (Residential) $18.00 $20.81 4% $20.00 $2209 Exhaust Hood - Type I (Commercial Grease Hood) $53.00 $61.27 0% $61.00 $8210 Exhaust Hood - Type II (Commercial Steam Hood) $40.00 $46.24 1% $46.00 $6 211 Non-Residential Incinerator $53.00 $61.27 0% $61.00 $8 212 Refrigerator Condenser Remote $33.00 $38.15 0% $38.00 $5213 Walk-in Box / Refrigerator Coil $27.00 $31.21 1% $31.00 $4214 Gas Meter or First Outlet $33.00 $38.15 0% $38.00 $5215 Gas Outlets (additional) $7.00 $8.09 1% $8.00 $1216 Other Mechanical Inspections $133.00 per hour $153.75 0% $153.00 $20 217 Plumbing218 Stand Alone Plumbing Plan Check $152.95 per hour $167.53 0% $167.00 $14 219 Fixtures 220 BathTub $13.00 each $15.03 0% $15.00 $2 221 Shower $13.00 $15.03 0% $15.00 $2222 Tub/Shower $13.00 $15.03 0% $15.00 $2 223 Sink $13.00 $15.03 0% $15.00 $2224 Toilet/Water Closet $13.00 $15.03 0% $15.00 $2225 Bidet $13.00 $15.03 0% $15.00 $2226 Urinal $13.00 $15.03 0% $15.00 $2 227 Kitchen Sink $13.00 $15.03 0% $15.00 $2228 Barsink $13.00 $15.03 0% $15.00 $2229 Dishwasher $13.00 $15.03 0% $15.00 $2230 Garbage Disposal $13.00 $15.03 0% $15.00 $2 231 Washing Machine $13.00 $15.03 0% $15.00 $2232 Laundry Tub/Sink $13.00 $15.03 0% $15.00 $2233 Mop Sink $13.00 $15.03 0% $15.00 $2 234 Gas Meter or First Outlet $33.00 $38.15 0% $38.00 $5 235 Gas Outlets (Additional) $7.00 $8.09 1% $8.00 $1236 Building Sewer $33.00 $38.15 0% $38.00 $5237 Grease Trap $44.00 $50.86 2% $50.00 $6 238 Interceptor/Pump $22.00 $25.43 2% $25.00 $3
239 Backflow Preventer (First 5) $18.00 $20.81 4% $20.00 $2 240 Backflow Preventer (More than 5) $9.00 $10.40 4% $10.00 $1 241 Roof Drain - Rainwater System $16.00 $18.50 3% $18.00 $2242 Water Heater $22.00 $25.43 2% $25.00 $3243 Water Pipe Repair / Replacement $100.00 $115.60 1% $115.00 $15 244 Water Service (Main) $16.00 $18.50 3% $18.00 $2245 Drain-Vent Repair / Alterations $11.00 $12.72 6% $12.00 $1246 Drinking Fountain/ Water Softener $22.00 $25.43 2% $25.00 $3 Exhibit A

Page 416 of 445 ends

BUILDING FEES
# Title
Current
Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ 247 Solar Water System Fixtures (solar panels, tanks, water treatment equipment) $78.00 $90.17 0% $90.00 $12248 Swimming Pool Piping and Gas $93.00 $107.51 0% $107.00 $14249 Medical Gas System (Each Outlet) $20.00 $23.12 1% $23.00 $3250 Other Plumbing and Gas Inspections $133.00 per hour $153.75 0% $153.00 $20251 Stand Alone Electrical Plan Check $152.95 per hour $176.81 0% $176.00 $23252 Electrical253 Single Phase Service (per 100 amps) $77.05 $89.07 0% $89.00 $12254 Single Phase Service (per 200 amps up to 400) $177.05 $204.67 0% $204.00 $27255 Three Phase Service (per 100 amps) $92.00 $106.35 0% $106.00 $14256 Three Phase Service (per 100 amps up to 400) $192.00 $221.96 0% $221.00 $29257 Switches and outlets (first 50 - new item) $2.00 $2.31 13% $2.00 $0 258 Switches and outlets (each additional 25 - new item) $1.00 $1.16 13% $1.00 $0259 15 or 20 amp (first 10 circuits) $7.00 $8.09 1% $8.00 $1260 15 or 20 amp (next 90 circuits) $2.00 $2.31 13% $2.00 $0 261 15 or 20 amp (over 100 circuits) $2.00 $2.31 13% $2.00 $0262 25 to 40 amp circuits $40.00 $46.24 1% $46.00 $6263 50 to 175 amp circuits $47.00 $54.33 1% $54.00 $7264 200 amp and larger circuits $54.00 $62.42 1% $62.00 $8 265 Temporary Service $53.00 $61.27 0% $61.00 $8266 Temporary Pole $11.00 $12.72 6% $12.00 $1267 Pre-Inspection $67.00 $77.45 1% $77.00 $10268 Sign Circuit $53.00 $61.27 0% $61.00 $8 269 Swimming Pool/Spa $67.00 $77.45 1% $77.00 $10
270 Solar Photovoltaic - Residential 1-10KVA $67.00 $77.45 1% $77.00 $10271 Solar Photovoltaic - Residential 10KVA> $67.00 $77.45 1% $77.00 $10 272 Solar Photovoltaic - Commercial $67.00 $77.45 1% $77.00 $10 273 Generator Installation $67.00 $77.45 1% $77.00 $10
274 Battery Backup or (ESS)Energy Storage System $67.00 $77.45 1% $77.00 $10275 Other Electrical Inspections $152.95 per hour $176.81 0% $176.00 $23276 "After Hours" Construction Permit $57.50 $66.47 1% $66.00 $9 277 EV Charging278 Type I $87.00 each $100.57 1% $100.00 $13 279 Type II $95.00 each $109.82 1% $109.00 $14
280 Type III $185.00 each $213.86 0% $213.00 $28281 Fire Sprinklers $5.00 per head $5.78 13% $5.00 $0.00282 Fire Alarm $152.95 $176.81 0% $176.00 $23.05283 Flat Work (up to 250 SF) $184.00 SqFt $212.71 0% $212.00 $28.00 284 Each additional > 250 SF $22.00 SqFt $25.43 2% $25.00 $3.00 Exhibit
A

Page 417 of 445 ends

UBC
Class Occupancy Type
Project Size
Threshold
Current
Fee
Full Cost using
% change
needed
Suggested
Base Fee
Current Fee
for Each
Additional
100 s.f.

Full Cost
using %
change
needed
Suggested Fee
for Each
Additional 100
s.f.

Difference in
base fee
Current
Fee
Full Cost using
% change
needed
Suggested
Base Fee
Current Fee
for Each
Additional
100 s.f.

Full Cost
using ICC
per sq ft
Suggested Fee
for Each
Additional 100
s.f.

Difference in
base fee
Current
Fee
Full cost using
% change
needed
Suggested
Base Fee
Current Fee
for Each
Additional
100 s.f.

Full Cost
using ICC
per sq ft
Suggested Fee
for Each
Additional 100
s.f.

Difference in
base fee
A-1 Theater 1,000 $3,907 $4,516.56 $4,516.56 $13.13 $15.18 $15.18 $609.56 $3,256 $3,763.99 $3,763.99 $10.94 $12.65 $12.65 $507.99 $2,605 $3,011.42 $3,011.42 $8.75 $10.12 $10.12 $406.42 5,000 $4,432 $5,123.46 $5,123.46 $16.02 $18.52 $18.52 $691.46 $3,694 $4,270.32 $4,270.32 $13.35 $15.43 $15.43 $576.32 $2,955 $3,416.03 $3,416.03 $10.68 $12.35 $12.35 $461.03 10,000 $5,233 $6,049.43 $6,049.43 $8.99 $10.39 $10.39 $816.43 $4,361 $5,041.39 $5,041.39 $7.49 $8.66 $8.66 $680.39 $3,489 $4,033.34 $4,033.34 $5.99 $6.92 $6.92 $544.3420,000 $6,132 $7,088.69 $7,088.69 $3.50 $4.05 $4.05 $956.69 $5,110 $5,907.24 $5,907.24 $2.92 $3.38 $3.38 $797.24 $4,088 $4,725.79 $4,725.79 $2.33 $2.69 $2.69 $637.7950,000 $7,182 $8,302.51 $8,302.51 $4.72 $5.46 $5.46 $1,120.51 $5,985 $6,918.76 $6,918.76 $3.93 $4.54 $4.54 $933.76 $4,788 $5,535.01 $5,535.01 $3.14 $3.63 $3.63 $747.01 100,000 $9,540 $11,028.39 $11,028.39 $9.54 $11.03 $11.03 $1,488.39 $7,950 $9,190.33 $9,190.33 $7.95 $9.19 $9.19 $1,240.33 $6,360 $7,352.26 $7,352.26 $6.36 $7.35 $7.35 $992.26 A-2 Church 1,000 $3,907 $4,516.56 $4,516.56 $13.13 $15.18 $15.18 $609.56 $3,256 $3,763.99 $3,763.99 $10.94 $12.65 $12.65 $507.99 $2,605 $3,011.42 $3,011.42 $8.75 $10.12 $10.12 $406.42 5,000 $4,432 $5,123.46 $5,123.46 $16.02 $18.52 $18.52 $691.46 $3,694 $4,270.32 $4,270.32 $13.35 $15.43 $15.43 $576.32 $2,955 $3,416.03 $3,416.03 $10.68 $12.35 $12.35 $461.03 10,000 $5,233 $6,049.43 $6,049.43 $8.99 $10.39 $10.39 $816.43 $4,361 $5,041.39 $5,041.39 $7.49 $8.66 $8.66 $680.39 $3,489 $4,033.34 $4,033.34 $5.99 $6.92 $6.92 $544.3420,000 $6,132 $7,088.69 $7,088.69 $3.50 $4.05 $4.05 $956.69 $5,110 $5,907.24 $5,907.24 $2.92 $3.38 $3.38 $797.24 $4,088 $4,725.79 $4,725.79 $2.33 $2.69 $2.69 $637.7950,000 $7,182 $8,302.51 $8,302.51 $4.72 $5.46 $5.46 $1,120.51 $5,985 $6,918.76 $6,918.76 $3.93 $4.54 $4.54 $933.76 $4,788 $5,535.01 $5,535.01 $3.14 $3.63 $3.63 $747.01 100,000 $9,540 $11,028.39 $11,028.39 $9.54 $11.03 $11.03 $1,488.39 $7,950 $9,190.33 $9,190.33 $7.95 $9.19 $9.19 $1,240.33 $6,360 $7,352.26 $7,352.26 $6.36 $7.35 $7.35 $992.26 A-2.1 Auditorium 1,000 $3,907 $4,516.56 $4,516.56 $13.13 $15.18 $15.18 $609.56 $3,256 $3,763.99 $3,763.99 $10.94 $12.65 $12.65 $507.99 $2,605 $3,011.42 $3,011.42 $8.75 $10.12 $10.12 $406.42 5,000 $4,432 $5,123.46 $5,123.46 $16.02 $18.52 $18.52 $691.46 $3,694 $4,270.32 $4,270.32 $13.35 $15.43 $15.43 $576.32 $2,955 $3,416.03 $3,416.03 $10.68 $12.35 $12.35 $461.03 10,000 $5,233 $6,049.43 $6,049.43 $8.99 $10.39 $10.39 $816.43 $4,361 $5,041.39 $5,041.39 $7.49 $8.66 $8.66 $680.39 $3,489 $4,033.34 $4,033.34 $5.99 $6.92 $6.92 $544.3420,000 $6,132 $7,088.69 $7,088.69 $3.50 $4.05 $4.05 $956.69 $5,110 $5,907.24 $5,907.24 $2.92 $3.38 $3.38 $797.24 $4,088 $4,725.79 $4,725.79 $2.33 $2.69 $2.69 $637.7950,000 $7,182 $8,302.51 $8,302.51 $4.72 $5.46 $5.46 $1,120.51 $5,985 $6,918.76 $6,918.76 $3.93 $4.54 $4.54 $933.76 $4,788 $5,535.01 $5,535.01 $3.14 $3.63 $3.63 $747.01 100,000 $9,540 $11,028.39 $11,028.39 $9.54 $11.03 $11.03 $1,488.39 $7,950 $9,190.33 $9,190.33 $7.95 $9.19 $9.19 $1,240.33 $6,360 $7,352.26 $7,352.26 $6.36 $7.35 $7.35 $992.26 A-2.1 Restaurant 1,000 $4,698 $5,430.96 $5,430.96 $15.76 $18.22 $18.22 $732.96 $3,915 $4,525.80 $4,525.80 $13.13 $15.18 $15.18 $610.80 $3,132 $3,620.64 $3,620.64 $10.51 $12.15 $12.15 $488.64 5,000 $5,328 $6,159.25 $6,159.25 $19.23 $22.23 $22.23 $831.25 $4,440 $5,132.71 $5,132.71 $16.03 $18.53 $18.53 $692.71 $3,552 $4,106.17 $4,106.17 $12.82 $14.82 $14.82 $554.17 10,000 $6,290 $7,271.34 $7,271.34 $10.82 $12.51 $12.51 $981.34 $5,241 $6,058.68 $6,058.68 $9.01 $10.42 $10.42 $817.68 $4,193 $4,847.18 $4,847.18 $7.21 $8.33 $8.33 $654.1820,000 $7,371 $8,520.99 $8,520.99 $4.21 $4.87 $4.87 $1,149.99 $6,143 $7,101.41 $7,101.41 $3.50 $4.05 $4.05 $958.41 $4,914 $5,680.66 $5,680.66 $2.80 $3.24 $3.24 $766.6650,000 $8,633 $9,979.89 $9,979.89 $5.66 $6.54 $6.54 $1,346.89 $7,194 $8,316.38 $8,316.38 $4.71 $5.44 $5.44 $1,122.38 $5,755 $6,652.87 $6,652.87 $3.77 $4.36 $4.36 $897.87 100,000 $11,460 $13,247.94 $13,247.94 $11.46 $13.25 $13.25 $1,787.94 $9,550 $11,039.95 $11,039.95 $9.55 $11.04 $11.04 $1,489.95 $7,640 $8,831.96 $8,831.96 $7.64 $8.83 $8.83 $1,191.96 A-3 Small Assembly Buildings 100 $2,338 $2,702.77 $2,702.77 $75.07 $86.78 $86.78 $364.77 $1,949 $2,253.08 $2,253.08 $62.56 $72.32 $72.32 $304.08 $1,559 $1,802.23 $1,802.23 $50.05 $57.86 $57.86 $243.23 500 $2,639 $3,050.73 $3,050.73 $91.53 $105.81 $105.81 $411.73 $2,199 $2,542.08 $2,542.08 $76.28 $88.18 $88.18 $343.08 $1,759 $2,033.43 $2,033.43 $61.02 $70.54 $70.54 $274.43 1,000 $3,096 $3,579.03 $3,579.03 $51.48 $59.51 $59.51 $483.03 $2,580 $2,982.52 $2,982.52 $42.90 $49.59 $49.59 $402.52 $2,064 $2,386.02 $2,386.02 $34.32 $39.67 $39.67 $322.022,000 $3,611 $4,174.37 $4,174.37 $20.01 $23.13 $23.13 $563.37 $3,009 $3,478.45 $3,478.45 $16.67 $19.27 $19.27 $469.45 $2,407 $2,782.53 $2,782.53 $13.34 $15.42 $15.42 $375.535,000 $4,211 $4,867.98 $4,867.98 $26.90 $31.10 $31.10 $656.98 $3,509 $4,056.46 $4,056.46 $22.41 $25.91 $25.91 $547.46 $2,808 $3,246.09 $3,246.09 $17.93 $20.73 $20.73 $438.09 10,000 $5,556 $6,422.83 $6,422.83 $55.56 $64.23 $64.23 $866.83 $4,630 $5,352.35 $5,352.35 $46.30 $53.52 $53.52 $722.35 $3,704 $4,281.88 $4,281.88 $37.04 $42.82 $42.82 $577.88 A-3 Bowling Alley 1,000 $2,420 $2,797.56 $2,797.56 $7.92 $9.16 $9.16 $377.56 $2,017 $2,331.68 $2,331.68 $6.60 $7.63 $7.63 $314.68 $1,613 $1,864.65 $1,864.65 $5.28 $6.10 $6.10 $251.65 5,000 $2,737 $3,164.02 $3,164.02 $9.66 $11.17 $11.17 $427.02 $2,281 $2,636.87 $2,636.87 $8.05 $9.31 $9.31 $355.87 $1,824 $2,108.57 $2,108.57 $6.44 $7.44 $7.44 $284.57 10,000 $3,220 $3,722.37 $3,722.37 $5.44 $6.29 $6.29 $502.37 $2,683 $3,101.59 $3,101.59 $4.53 $5.24 $5.24 $418.59 $2,146 $2,480.81 $2,480.81 $3.62 $4.18 $4.18 $334.8120,000 $3,763 $4,350.09 $4,350.09 $2.12 $2.45 $2.45 $587.09 $3,136 $3,625.27 $3,625.27 $1.76 $2.03 $2.03 $489.27 $2,509 $2,900.44 $2,900.44 $1.41 $1.63 $1.63 $391.4450,000 $4,398 $5,084.16 $5,084.16 $2.84 $3.28 $3.28 $686.16 $3,665 $4,236.80 $4,236.80 $2.37 $2.74 $2.74 $571.80 $2,932 $3,389.44 $3,389.44 $1.90 $2.20 $2.20 $457.44 100,000 $5,820 $6,728.01 $6,728.01 $5.82 $6.73 $6.73 $908.01 $4,850 $5,606.68 $5,606.68 $4.85 $5.61 $5.61 $756.68 $3,880 $4,485.34 $4,485.34 $3.88 $4.49 $4.49 $605.34 A-3 Library / Museum 1,000 $3,025 $3,496.95 $3,496.95 $9.90 $11.44 $11.44 $471.95 $2,521 $2,914.32 $2,914.32 $8.25 $9.54 $9.54 $393.32 $2,017 $2,331.68 $2,331.68 $6.60 $7.63 $7.63 $314.68 5,000 $3,421 $3,954.73 $3,954.73 $12.08 $13.96 $13.96 $533.73 $2,851 $3,295.80 $3,295.80 $10.06 $11.63 $11.63 $444.80 $2,281 $2,636.87 $2,636.87 $8.05 $9.31 $9.31 $355.87 10,000 $4,025 $4,652.96 $4,652.96 $6.80 $7.86 $7.86 $627.96 $3,354 $3,877.28 $3,877.28 $5.66 $6.54 $6.54 $523.28 $2,683 $3,101.59 $3,101.59 $4.53 $5.24 $5.24 $418.5920,000 $4,704 $5,437.90 $5,437.90 $2.65 $3.06 $3.06 $733.90 $3,920 $4,531.58 $4,531.58 $2.20 $2.54 $2.54 $611.58 $3,136 $3,625.27 $3,625.27 $1.76 $2.03 $2.03 $489.2750,000 $5,498 $6,355.78 $6,355.78 $3.56 $4.12 $4.12 $857.78 $4,581 $5,295.71 $5,295.71 $2.96 $3.42 $3.42 $714.71 $3,665 $4,236.80 $4,236.80 $2.37 $2.74 $2.74 $571.80 100,000 $7,275 $8,410.02 $8,410.02 $7.28 $8.42 $8.42 $1,135.02 $6,063 $7,008.93 $7,008.93 $6.06 $7.01 $7.01 $945.93 $4,850 $5,606.68 $5,606.68 $4.85 $5.61 $5.61 $756.68 B Banks 1,000 $3,918 $4,529.27 $4,529.27 $13.18 $15.24 $15.24 $611.27 $3,265 $3,774.39 $3,774.39 $10.98 $12.69 $12.69 $509.39 $2,612 $3,019.51 $3,019.51 $8.78 $10.15 $10.15 $407.51 5,000 $4,445 $5,138.49 $5,138.49 $16.04 $18.54 $18.54 $693.49 $3,705 $4,283.04 $4,283.04 $13.37 $15.46 $15.46 $578.04 $2,964 $3,426.43 $3,426.43 $10.70 $12.37 $12.37 $462.43 10,000 $5,248 $6,066.77 $6,066.77 $9.04 $10.45 $10.45 $818.77 $4,373 $5,055.26 $5,055.26 $7.53 $8.70 $8.70 $682.26 $3,498 $4,043.74 $4,043.74 $6.02 $6.96 $6.96 $545.7420,000 $6,151 $7,110.66 $7,110.66 $3.52 $4.07 $4.07 $959.66 $5,126 $5,925.74 $5,925.74 $2.93 $3.39 $3.39 $799.74 $4,101 $4,740.82 $4,740.82 $2.34 $2.71 $2.71 $639.8250,000 $7,206 $8,330.25 $8,330.25 $4.72 $5.46 $5.46 $1,124.25 $6,005 $6,941.88 $6,941.88 $3.93 $4.54 $4.54 $936.88 $4,804 $5,553.50 $5,553.50 $3.14 $3.63 $3.63 $749.50 100,000 $9,564 $11,056.14 $11,056.14 $9.56 $11.05 $11.05 $1,492.14 $7,970 $9,213.45 $9,213.45 $7.97 $9.21 $9.21 $1,243.45 $6,376 $7,370.76 $7,370.76 $6.38 $7.38 $7.38 $994.76 B Car Wash 1,000 $2,328 $2,691.21 $2,691.21 $7.61 $8.80 $8.80 $363.21 $1,940 $2,242.67 $2,242.67 $6.35 $7.34 $7.34 $302.67 $1,552 $1,794.14 $1,794.14 $5.08 $5.87 $5.87 $242.14 5,000 $2,633 $3,043.79 $3,043.79 $9.26 $10.70 $10.70 $410.79 $2,194 $2,536.30 $2,536.30 $7.72 $8.92 $8.92 $342.30 $1,755 $2,028.81 $2,028.81 $6.18 $7.14 $7.14 $273.81 10,000 $3,096 $3,579.03 $3,579.03 $5.21 $6.02 $6.02 $483.03 $2,580 $2,982.52 $2,982.52 $4.34 $5.02 $5.02 $402.52 $2,064 $2,386.02 $2,386.02 $3.47 $4.01 $4.01 $322.0220,000 $3,617 $4,181.31 $4,181.31 $2.02 $2.34 $2.34 $564.31 $3,014 $3,484.23 $3,484.23 $1.69 $1.95 $1.95 $470.23 $2,411 $2,787.15 $2,787.15 $1.35 $1.56 $1.56 $376.1550,000 $4,224 $4,883.01 $4,883.01 $2.74 $3.17 $3.17 $659.01 $3,520 $4,069.18 $4,069.18 $2.28 $2.64 $2.64 $549.18 $2,816 $3,255.34 $3,255.34 $1.82 $2.10 $2.10 $439.34 100,000 $5,592 $6,464.44 $6,464.44 $5.59 $6.46 $6.46 $872.44 $4,660 $5,387.04 $5,387.04 $4.66 $5.39 $5.39 $727.04 $3,728 $4,309.63 $4,309.63 $3.73 $4.31 $4.31 $581.63 B High Rise Offices 1,000 $4,479 $5,177.80 $5,177.80 $15.14 $17.50 $17.50 $698.80 $3,732 $4,314.25 $4,314.25 $12.62 $14.59 $14.59 $582.25 $2,986 $3,451.86 $3,451.86 $10.09 $11.66 $11.66 $465.86 5,000 $5,084 $5,877.19 $5,877.19 $18.46 $21.34 $21.34 $793.19 $4,237 $4,898.04 $4,898.04 $15.38 $17.78 $17.78 $661.04 $3,390 $3,918.89 $3,918.89 $12.30 $14.22 $14.22 $528.89 10,000 $6,007 $6,944.19 $6,944.19 $10.37 $11.99 $11.99 $937.19 $5,006 $5,787.02 $5,787.02 $8.64 $9.99 $9.99 $781.02 $4,005 $4,629.84 $4,629.84 $6.91 $7.99 $7.99 $624.8420,000 $7,044 $8,142.98 $8,142.98 $4.04 $4.67 $4.67 $1,098.98 $5,870 $6,785.81 $6,785.81 $3.37 $3.90 $3.90 $915.81 $4,696 $5,428.65 $5,428.65 $2.69 $3.11 $3.11 $732.6550,000 $8,256 $9,544.07 $9,544.07 $5.42 $6.27 $6.27 $1,288.07 $6,880 $7,953.39 $7,953.39 $4.52 $5.23 $5.23 $1,073.39 $5,504 $6,362.71 $6,362.71 $3.62 $4.18 $4.18 $858.71 100,000 $10,968 $12,679.18 $12,679.18 $10.97 $12.68 $12.68 $1,711.18 $9,140 $10,565.99 $10,565.99 $9.14 $10.57 $10.57 $1,425.99 $7,312 $8,452.79 $8,452.79 $7.31 $8.45 $8.45 $1,140.79 B High Rise Offices - Phased Permits 1,000 $4,479 $5,177.80 $5,177.80 $15.14 $17.50 $17.50 $698.80 $3,732 $4,314.25 $4,314.25 $12.62 $14.59 $14.59 $582.25 $2,986 $3,451.86 $3,451.86 $10.09 $11.66 $11.66 $465.86 5,000 $5,084 $5,877.19 $5,877.19 $18.46 $21.34 $21.34 $793.19 $4,237 $4,898.04 $4,898.04 $15.38 $17.78 $17.78 $661.04 $3,390 $3,918.89 $3,918.89 $12.30 $14.22 $14.22 $528.89 10,000 $6,007 $6,944.19 $6,944.19 $10.37 $11.99 $11.99 $937.19 $5,006 $5,787.02 $5,787.02 $8.64 $9.99 $9.99 $781.02 $4,005 $4,629.84 $4,629.84 $6.91 $7.99 $7.99 $624.8420,000 $7,044 $8,142.98 $8,142.98 $4.04 $4.67 $4.67 $1,098.98 $5,870 $6,785.81 $6,785.81 $3.37 $3.90 $3.90 $915.81 $4,696 $5,428.65 $5,428.65 $2.69 $3.11 $3.11 $732.6550,000 $8,256 $9,544.07 $9,544.07 $5.42 $6.27 $6.27 $1,288.07 $6,880 $7,953.39 $7,953.39 $4.52 $5.23 $5.23 $1,073.39 $5,504 $6,362.71 $6,362.71 $3.62 $4.18 $4.18 $858.71 100,000 $10,968 $12,679.18 $12,679.18 $10.97 $12.68 $12.68 $1,711.18 $9,140 $10,565.99 $10,565.99 $9.14 $10.57 $10.57 $1,425.99 $7,312 $8,452.79 $8,452.79 $7.31 $8.45 $8.45 $1,140.79 B Laundromat 100 $2,481 $2,868.08 $2,868.08 $80.08 $92.57 $92.57 $387.08 $2,068 $2,390.64 $2,390.64 $66.73 $77.14 $77.14 $322.64 $1,654 $1,912.05 $1,912.05 $53.39 $61.72 $61.72 $258.05 500 $2,802 $3,239.16 $3,239.16 $97.62 $112.85 $112.85 $437.16 $2,335 $2,699.30 $2,699.30 $81.35 $94.04 $94.04 $364.30 $1,868 $2,159.44 $2,159.44 $65.08 $75.23 $75.23 $291.44 1,000 $3,290 $3,803.29 $3,803.29 $54.90 $63.47 $63.47 $513.29 $2,742 $3,169.80 $3,169.80 $45.75 $52.89 $52.89 $427.80 $2,193 $2,535.14 $2,535.14 $36.60 $42.31 $42.31 $342.142,000 $3,839 $4,437.95 $4,437.95 $21.37 $24.70 $24.70 $598.95 $3,199 $3,698.10 $3,698.10 $17.80 $20.58 $20.58 $499.10 $2,559 $2,958.25 $2,958.25 $14.24 $16.46 $16.46 $399.255,000 $4,480 $5,178.95 $5,178.95 $28.67 $33.14 $33.14 $698.95 $3,733 $4,315.41 $4,315.41 $23.89 $27.62 $27.62 $582.41 $2,987 $3,453.02 $3,453.02 $19.11 $22.09 $22.09 $466.02 10,000 $5,913 $6,835.52 $6,835.52 $59.13 $68.36 $68.36 $922.52 $4,928 $5,696.85 $5,696.85 $49.28 $56.97 $56.97 $768.85 $3,942 $4,557.02 $4,557.02 $39.42 $45.57 $45.57 $615.02 B Medical Office 1,000 $4,898 $5,662.17 $5,662.17 $16.47 $19.04 $19.04 $764.17 $4,082 $4,718.86 $4,718.86 $13.73 $15.87 $15.87 $636.86 $3,265 $3,774.39 $3,774.39 $10.98 $12.69 $12.69 $509.39

CITY OF COVINA

CONSOLIDATED SCHEDULE OF NEW CONSTRUCTION FEES (P/C PROCESSING AND INSPECTION COMBINED) (All Construction Types)

NEW CONSTRUCTION
Types IA Types IB, IIA, IIIA, VA Types IIB, IIIB, IV, VB Exhibit
A

Page 418 of 445 ends

UBC
Class Occupancy Type
Project Size
Threshold
Current
Fee
Full Cost using
% change
needed
Suggested
Base Fee
Current Fee
for Each
Additional
100 s.f.

Full Cost
using %
change
needed
Suggested Fee
for Each
Additional 100
s.f.

Difference in
base fee
Current
Fee
Full Cost using
% change
needed
Suggested
Base Fee
Current Fee
for Each
Additional
100 s.f.

Full Cost
using ICC
per sq ft
Suggested Fee
for Each
Additional 100
s.f.

Difference in
base fee
Current
Fee
Full cost using
% change
needed
Suggested
Base Fee
Current Fee
for Each
Additional
100 s.f.

Full Cost
using ICC
per sq ft
Suggested Fee
for Each
Additional 100
s.f.

Difference in
base fee

CITY OF COVINA

CONSOLIDATED SCHEDULE OF NEW CONSTRUCTION FEES (P/C PROCESSING AND INSPECTION COMBINED) (All Construction Types)

NEW CONSTRUCTION
Types IA Types IB, IIA, IIIA, VA Types IIB, IIIB, IV, VB 5,000 $5,557 $6,423.98 $6,423.98 $20.06 $23.19 $23.19 $866.98 $4,631 $5,353.51 $5,353.51 $16.71 $19.32 $19.32 $722.51 $3,705 $4,283.04 $4,283.04 $13.37 $15.46 $15.46 $578.04 10,000 $6,560 $7,583.47 $7,583.47 $11.30 $13.06 $13.06 $1,023.47 $5,466 $6,318.78 $6,318.78 $9.41 $10.88 $10.88 $852.78 $4,373 $5,055.26 $5,055.26 $7.53 $8.70 $8.70 $682.2620,000 $7,689 $8,888.61 $8,888.61 $4.40 $5.09 $5.09 $1,199.61 $6,408 $7,407.75 $7,407.75 $3.66 $4.23 $4.23 $999.75 $5,126 $5,925.74 $5,925.74 $2.93 $3.39 $3.39 $799.7450,000 $9,008 $10,413.39 $10,413.39 $5.90 $6.82 $6.82 $1,405.39 $7,506 $8,677.06 $8,677.06 $4.91 $5.68 $5.68 $1,171.06 $6,005 $6,941.88 $6,941.88 $3.93 $4.54 $4.54 $936.88 100,000 $11,955 $13,820.17 $13,820.17 $11.96 $13.83 $13.83 $1,865.17 $9,963 $11,517.39 $11,517.39 $9.96 $11.51 $11.51 $1,554.39 $7,970 $9,213.45 $9,213.45 $7.97 $9.21 $9.21 $1,243.45 B Offices 1,000 $3,096 $3,579.03 $3,579.03 $10.16 $11.75 $11.75 $483.03 $2,580 $2,982.52 $2,982.52 $8.46 $9.78 $9.78 $402.52 $2,064 $2,386.02 $2,386.02 $6.77 $7.83 $7.83 $322.02 5,000 $3,503 $4,049.52 $4,049.52 $12.39 $14.32 $14.32 $546.52 $2,919 $3,374.41 $3,374.41 $10.33 $11.94 $11.94 $455.41 $2,335 $2,699.30 $2,699.30 $8.26 $9.55 $9.55 $364.30 10,000 $4,122 $4,765.10 $4,765.10 $6.96 $8.05 $8.05 $643.10 $3,435 $3,970.92 $3,970.92 $5.80 $6.70 $6.70 $535.92 $2,748 $3,176.73 $3,176.73 $4.64 $5.36 $5.36 $428.7320,000 $4,818 $5,569.69 $5,569.69 $2.72 $3.14 $3.14 $751.69 $4,015 $4,641.40 $4,641.40 $2.26 $2.61 $2.61 $626.40 $3,212 $3,713.12 $3,713.12 $1.81 $2.09 $2.09 $501.1250,000 $5,633 $6,511.84 $6,511.84 $3.65 $4.22 $4.22 $878.84 $4,694 $5,426.34 $5,426.34 $3.04 $3.51 $3.51 $732.34 $3,755 $4,340.84 $4,340.84 $2.43 $2.81 $2.81 $585.84 100,000 $7,455 $8,618.10 $8,618.10 $7.46 $8.62 $8.62 $1,163.10 $6,213 $7,182.33 $7,182.33 $6.21 $7.18 $7.18 $969.33 $4,970 $5,745.40 $5,745.40 $4.97 $5.75 $5.75 $775.40 B Offices - Phased Permits 1,000 $3,096 $3,579.03 $3,579.03 $10.16 $11.75 $11.75 $483.03 $2,580 $2,982.52 $2,982.52 $8.46 $9.78 $9.78 $402.52 $2,064 $2,386.02 $2,386.02 $6.77 $7.83 $7.83 $322.02 5,000 $3,503 $4,049.52 $4,049.52 $12.39 $14.32 $14.32 $546.52 $2,919 $3,374.41 $3,374.41 $10.33 $11.94 $11.94 $455.41 $2,335 $2,699.30 $2,699.30 $8.26 $9.55 $9.55 $364.30 10,000 $4,122 $4,765.10 $4,765.10 $6.96 $8.05 $8.05 $643.10 $3,435 $3,970.92 $3,970.92 $5.80 $6.70 $6.70 $535.92 $2,748 $3,176.73 $3,176.73 $4.64 $5.36 $5.36 $428.7320,000 $4,818 $5,569.69 $5,569.69 $2.72 $3.14 $3.14 $751.69 $4,015 $4,641.40 $4,641.40 $2.26 $2.61 $2.61 $626.40 $3,212 $3,713.12 $3,713.12 $1.81 $2.09 $2.09 $501.1250,000 $5,633 $6,511.84 $6,511.84 $3.65 $4.22 $4.22 $878.84 $4,694 $5,426.34 $5,426.34 $3.04 $3.51 $3.51 $732.34 $3,755 $4,340.84 $4,340.84 $2.43 $2.81 $2.81 $585.84 100,000 $7,455 $8,618.10 $8,618.10 $7.46 $8.62 $8.62 $1,163.10 $6,213 $7,182.33 $7,182.33 $6.21 $7.18 $7.18 $969.33 $4,970 $5,745.40 $5,745.40 $4.97 $5.75 $5.75 $775.40 B Public Buildings - Fire Stations 1,000 $2,443 $2,824.15 $2,824.15 $8.01 $9.26 $9.26 $381.15 $2,036 $2,353.65 $2,353.65 $6.67 $7.71 $7.71 $317.65 $1,628 $1,881.99 $1,881.99 $5.34 $6.17 $6.17 $253.99 5,000 $2,763 $3,194.07 $3,194.07 $9.76 $11.28 $11.28 $431.07 $2,303 $2,662.31 $2,662.31 $8.13 $9.40 $9.40 $359.31 $1,842 $2,129.38 $2,129.38 $6.50 $7.51 $7.51 $287.38 10,000 $3,251 $3,758.21 $3,758.21 $5.48 $6.33 $6.33 $507.21 $2,709 $3,131.65 $3,131.65 $4.57 $5.28 $5.28 $422.65 $2,167 $2,505.09 $2,505.09 $3.66 $4.23 $4.23 $338.0920,000 $3,799 $4,391.71 $4,391.71 $2.14 $2.47 $2.47 $592.71 $3,166 $3,659.95 $3,659.95 $1.78 $2.06 $2.06 $493.95 $2,533 $2,928.19 $2,928.19 $1.42 $1.64 $1.64 $395.1950,000 $4,440 $5,132.71 $5,132.71 $2.88 $3.33 $3.33 $692.71 $3,700 $4,277.26 $4,277.26 $2.40 $2.77 $2.77 $577.26 $2,960 $3,421.81 $3,421.81 $1.92 $2.22 $2.22 $461.81 100,000 $5,880 $6,797.37 $6,797.37 $5.88 $6.80 $6.80 $917.37 $4,900 $5,664.48 $5,664.48 $4.90 $5.66 $5.66 $764.48 $3,920 $4,531.58 $4,531.58 $3.92 $4.53 $4.53 $611.58 B Public Buildings - Miscellaneous 1,000 $2,420 $2,797.56 $2,797.56 $7.92 $9.16 $9.16 $377.56 $2,017 $2,331.68 $2,331.68 $6.60 $7.63 $7.63 $314.68 $1,613 $1,864.65 $1,864.65 $5.28 $6.10 $6.10 $251.65 5,000 $2,737 $3,164.02 $3,164.02 $9.66 $11.17 $11.17 $427.02 $2,281 $2,636.87 $2,636.87 $8.05 $9.31 $9.31 $355.87 $1,824 $2,108.57 $2,108.57 $6.44 $7.44 $7.44 $284.57 10,000 $3,220 $3,722.37 $3,722.37 $5.44 $6.29 $6.29 $502.37 $2,683 $3,101.59 $3,101.59 $4.53 $5.24 $5.24 $418.59 $2,146 $2,480.81 $2,480.81 $3.62 $4.18 $4.18 $334.8120,000 $3,763 $4,350.09 $4,350.09 $2.12 $2.45 $2.45 $587.09 $3,136 $3,625.27 $3,625.27 $1.76 $2.03 $2.03 $489.27 $2,509 $2,900.44 $2,900.44 $1.41 $1.63 $1.63 $391.4450,000 $4,398 $5,084.16 $5,084.16 $2.84 $3.28 $3.28 $686.16 $3,665 $4,236.80 $4,236.80 $2.37 $2.74 $2.74 $571.80 $2,932 $3,389.44 $3,389.44 $1.90 $2.20 $2.20 $457.44 100,000 $5,820 $6,728.01 $6,728.01 $5.82 $6.73 $6.73 $908.01 $4,850 $5,606.68 $5,606.68 $4.85 $5.61 $5.61 $756.68 $3,880 $4,485.34 $4,485.34 $3.88 $4.49 $4.49 $605.34 B Public Building - Office 1,000 $3,025 $3,496.95 $3,496.95 $9.90 $11.44 $11.44 $471.95 $2,521 $2,914.32 $2,914.32 $8.25 $9.54 $9.54 $393.32 $2,017 $2,331.68 $2,331.68 $6.60 $7.63 $7.63 $314.68 5,000 $3,421 $3,954.73 $3,954.73 $12.08 $13.96 $13.96 $533.73 $2,851 $3,295.80 $3,295.80 $10.06 $11.63 $11.63 $444.80 $2,281 $2,636.87 $2,636.87 $8.05 $9.31 $9.31 $355.87 10,000 $4,025 $4,652.96 $4,652.96 $6.80 $7.86 $7.86 $627.96 $3,354 $3,877.28 $3,877.28 $5.66 $6.54 $6.54 $523.28 $2,683 $3,101.59 $3,101.59 $4.53 $5.24 $5.24 $418.5920,000 $4,704 $5,437.90 $5,437.90 $2.65 $3.06 $3.06 $733.90 $3,920 $4,531.58 $4,531.58 $2.20 $2.54 $2.54 $611.58 $3,136 $3,625.27 $3,625.27 $1.76 $2.03 $2.03 $489.2750,000 $5,498 $6,355.78 $6,355.78 $3.56 $4.12 $4.12 $857.78 $4,581 $5,295.71 $5,295.71 $2.96 $3.42 $3.42 $714.71 $3,665 $4,236.80 $4,236.80 $2.37 $2.74 $2.74 $571.80 100,000 $7,275 $8,410.02 $8,410.02 $7.28 $8.42 $8.42 $1,135.02 $6,063 $7,008.93 $7,008.93 $6.06 $7.01 $7.01 $945.93 $4,850 $5,606.68 $5,606.68 $4.85 $5.61 $5.61 $756.68 B Public Buildings - Police 1,000 $2,534 $2,929.34 $2,929.34 $8.33 $9.63 $9.63 $395.34 $2,112 $2,441.51 $2,441.51 $6.94 $8.02 $8.02 $329.51 $1,689 $1,952.51 $1,952.51 $5.55 $6.42 $6.42 $263.51 5,000 $2,867 $3,314.30 $3,314.30 $10.14 $11.72 $11.72 $447.30 $2,390 $2,762.88 $2,762.88 $8.45 $9.77 $9.77 $372.88 $1,912 $2,210.30 $2,210.30 $6.76 $7.81 $7.81 $298.30 10,000 $3,374 $3,900.40 $3,900.40 $5.71 $6.60 $6.60 $526.40 $2,812 $3,250.72 $3,250.72 $4.76 $5.50 $5.50 $438.72 $2,250 $2,601.04 $2,601.04 $3.81 $4.40 $4.40 $351.0420,000 $3,946 $4,561.64 $4,561.64 $2.23 $2.58 $2.58 $615.64 $3,288 $3,800.98 $3,800.98 $1.86 $2.15 $2.15 $512.98 $2,630 $3,040.32 $3,040.32 $1.49 $1.72 $1.72 $410.3250,000 $4,614 $5,333.86 $5,333.86 $2.99 $3.46 $3.46 $719.86 $3,845 $4,444.88 $4,444.88 $2.49 $2.88 $2.88 $599.88 $3,076 $3,555.91 $3,555.91 $1.99 $2.30 $2.30 $479.91 100,000 $6,108 $7,060.95 $7,060.95 $6.11 $7.06 $7.06 $952.95 $5,090 $5,884.12 $5,884.12 $5.09 $5.88 $5.88 $794.12 $4,072 $4,707.30 $4,707.30 $4.07 $4.70 $4.70 $635.30 B Public Buildings - Recreation 1,000 $2,420 $2,797.56 $2,797.56 $7.92 $9.16 $9.16 $377.56 $2,017 $2,331.68 $2,331.68 $6.60 $7.63 $7.63 $314.68 $1,613 $1,864.65 $1,864.65 $5.28 $6.10 $6.10 $251.65 5,000 $2,737 $3,164.02 $3,164.02 $9.66 $11.17 $11.17 $427.02 $2,281 $2,636.87 $2,636.87 $8.05 $9.31 $9.31 $355.87 $1,824 $2,108.57 $2,108.57 $6.44 $7.44 $7.44 $284.57 10,000 $3,220 $3,722.37 $3,722.37 $5.44 $6.29 $6.29 $502.37 $2,683 $3,101.59 $3,101.59 $4.53 $5.24 $5.24 $418.59 $2,146 $2,480.81 $2,480.81 $3.62 $4.18 $4.18 $334.8120,000 $3,763 $4,350.09 $4,350.09 $2.12 $2.45 $2.45 $587.09 $3,136 $3,625.27 $3,625.27 $1.76 $2.03 $2.03 $489.27 $2,509 $2,900.44 $2,900.44 $1.41 $1.63 $1.63 $391.4450,000 $4,398 $5,084.16 $5,084.16 $2.84 $3.28 $3.28 $686.16 $3,665 $4,236.80 $4,236.80 $2.37 $2.74 $2.74 $571.80 $2,932 $3,389.44 $3,389.44 $1.90 $2.20 $2.20 $457.44 100,000 $5,820 $6,728.01 $6,728.01 $5.82 $6.73 $6.73 $908.01 $4,850 $5,606.68 $5,606.68 $4.85 $5.61 $5.61 $756.68 $3,880 $4,485.34 $4,485.34 $3.88 $4.49 $4.49 $605.34 E-1 Schools 500 $2,042 $2,360.58 $2,360.58 $13.21 $15.27 $15.27 $318.58 $1,702 $1,967.54 $1,967.54 $11.01 $12.73 $12.73 $265.54 $1,362 $1,574.49 $1,574.49 $8.80 $10.17 $10.17 $212.49 2,500 $2,306 $2,665.77 $2,665.77 $16.10 $18.61 $18.61 $359.77 $1,922 $2,221.86 $2,221.86 $13.42 $15.51 $15.51 $299.86 $1,538 $1,777.95 $1,777.95 $10.74 $12.42 $12.42 $239.955,000 $2,709 $3,131.65 $3,131.65 $9.06 $10.47 $10.47 $422.65 $2,258 $2,610.28 $2,610.28 $7.55 $8.73 $8.73 $352.28 $1,806 $2,087.77 $2,087.77 $6.04 $6.98 $6.98 $281.77 10,000 $3,162 $3,655.32 $3,655.32 $3.52 $4.07 $4.07 $493.32 $2,635 $3,046.10 $3,046.10 $2.93 $3.39 $3.39 $411.10 $2,108 $2,436.88 $2,436.88 $2.35 $2.72 $2.72 $328.8825,000 $3,690 $4,265.70 $4,265.70 $4.73 $5.47 $5.47 $575.70 $3,075 $3,554.75 $3,554.75 $3.94 $4.55 $4.55 $479.75 $2,460 $2,843.80 $2,843.80 $3.15 $3.64 $3.64 $383.8050,000 $4,872 $5,632.11 $5,632.11 $9.74 $11.26 $11.26 $760.11 $4,060 $4,693.43 $4,693.43 $8.12 $9.39 $9.39 $633.43 $3,248 $3,754.74 $3,754.74 $6.50 $7.51 $7.51 $506.74 E-2 Preschool / School 500 $2,042 $2,360.58 $2,360.58 $13.21 $15.27 $15.27 $318.58 $1,702 $1,967.54 $1,967.54 $11.01 $12.73 $12.73 $265.54 $1,362 $1,574.49 $1,574.49 $8.80 $10.17 $10.17 $212.49 2,500 $2,306 $2,665.77 $2,665.77 $16.10 $18.61 $18.61 $359.77 $1,922 $2,221.86 $2,221.86 $13.42 $15.51 $15.51 $299.86 $1,538 $1,777.95 $1,777.95 $10.74 $12.42 $12.42 $239.955,000 $2,709 $3,131.65 $3,131.65 $9.06 $10.47 $10.47 $422.65 $2,258 $2,610.28 $2,610.28 $7.55 $8.73 $8.73 $352.28 $1,806 $2,087.77 $2,087.77 $6.04 $6.98 $6.98 $281.77 10,000 $3,162 $3,655.32 $3,655.32 $3.52 $4.07 $4.07 $493.32 $2,635 $3,046.10 $3,046.10 $2.93 $3.39 $3.39 $411.10 $2,108 $2,436.88 $2,436.88 $2.35 $2.72 $2.72 $328.8825,000 $3,690 $4,265.70 $4,265.70 $4.73 $5.47 $5.47 $575.70 $3,075 $3,554.75 $3,554.75 $3.94 $4.55 $4.55 $479.75 $2,460 $2,843.80 $2,843.80 $3.15 $3.64 $3.64 $383.8050,000 $4,872 $5,632.11 $5,632.11 $9.74 $11.26 $11.26 $760.11 $4,060 $4,693.43 $4,693.43 $8.12 $9.39 $9.39 $633.43 $3,248 $3,754.74 $3,754.74 $6.50 $7.51 $7.51 $506.74 E-3 Daycare 100 $1,871 $2,162.91 $2,162.91 $60.05 $69.42 $69.42 $291.91 $1,559 $1,802.23 $1,802.23 $50.05 $57.86 $57.86 $243.23 $1,247 $1,441.55 $1,441.55 $40.04 $46.29 $46.29 $194.55 500 $2,111 $2,440.35 $2,440.35 $73.22 $84.64 $84.64 $329.35 $1,759 $2,033.43 $2,033.43 $61.02 $70.54 $70.54 $274.43 $1,407 $1,626.51 $1,626.51 $48.82 $56.44 $56.44 $219.51 1,000 $2,477 $2,863.45 $2,863.45 $41.18 $47.60 $47.60 $386.45 $2,064 $2,386.02 $2,386.02 $34.32 $39.67 $39.67 $322.02 $1,651 $1,908.58 $1,908.58 $27.46 $31.74 $31.74 $257.582,000 $2,889 $3,339.73 $3,339.73 $16.00 $18.50 $18.50 $450.73 $2,407 $2,782.53 $2,782.53 $13.34 $15.42 $15.42 $375.53 $1,926 $2,226.49 $2,226.49 $10.67 $12.33 $12.33 $300.495,000 $3,369 $3,894.62 $3,894.62 $21.52 $24.88 $24.88 $525.62 $2,808 $3,246.09 $3,246.09 $17.93 $20.73 $20.73 $438.09 $2,246 $2,596.41 $2,596.41 $14.34 $16.58 $16.58 $350.41 10,000 $4,445 $5,138.49 $5,138.49 $44.45 $51.38 $51.38 $693.49 $3,704 $4,281.88 $4,281.88 $37.04 $42.82 $42.82 $577.88 $2,963 $3,425.28 $3,425.28 $29.63 $34.25 $34.25 $462.28 F-1 Industrial 1,000 $765 $884.35 $884.35 $2.00 $2.31 $2.31 $119.35 $638 $737.54 $737.54 $1.66 $1.92 $1.92 $99.54 $510 $589.57 $589.57 $1.33 $1.54 $1.54 $79.57 5,000 $845 $976.83 $976.83 $2.45 $2.83 $2.83 $131.83 $704 $813.84 $813.84 $2.04 $2.36 $2.36 $109.84 $564 $651.99 $651.99 $1.63 $1.88 $1.88 $87.99 10,000 $968 $1,119.02 $1,119.02 $1.37 $1.58 $1.58 $151.02 $806 $931.75 $931.75 $1.14 $1.32 $1.32 $125.75 $645 $745.63 $745.63 $0.91 $1.05 $1.05 $100.6320,000 $1,104 $1,276.24 $1,276.24 $0.54 $0.62 $0.62 $172.24 $920 $1,063.53 $1,063.53 $0.45 $0.52 $0.52 $143.53 $736 $850.83 $850.83 $0.36 $0.42 $0.42 $114.8350,000 $1,268 $1,465.83 $1,465.83 $0.71 $0.82 $0.82 $197.83 $1,056 $1,220.75 $1,220.75 $0.59 $0.68 $0.68 $164.75 $845 $976.83 $976.83 $0.47 $0.54 $0.54 $131.83 100,000 $1,620 $1,872.75 $1,872.75 $1.62 $1.87 $1.87 $252.75 $1,350 $1,560.62 $1,560.62 $1.35 $1.56 $1.56 $210.62 $1,080 $1,248.50 $1,248.50 $1.08 $1.25 $1.25 $168.50 F-1 Manufacturing 2,000 $2,797 $3,233.38 $3,233.38 $4.62 $5.34 $5.34 $436.38 $2,331 $2,694.67 $2,694.67 $3.85 $4.45 $4.45 $363.67 $1,865 $2,155.97 $2,155.97 $3.08 $3.56 $3.56 $290.97 10,000 $3,167 $3,661.10 $3,661.10 $5.65 $6.53 $6.53 $494.10 $2,639 $3,050.73 $3,050.73 $4.71 $5.44 $5.44 $411.73 $2,111 $2,440.35 $2,440.35 $3.77 $4.36 $4.36 $329.35 Exhibit
A

Page 419 of 445 ends

UBC
Class Occupancy Type
Project Size
Threshold
Current
Fee
Full Cost using
% change
needed
Suggested
Base Fee
Current Fee
for Each
Additional
100 s.f.

Full Cost
using %
change
needed
Suggested Fee
for Each
Additional 100
s.f.

Difference in
base fee
Current
Fee
Full Cost using
% change
needed
Suggested
Base Fee
Current Fee
for Each
Additional
100 s.f.

Full Cost
using ICC
per sq ft
Suggested Fee
for Each
Additional 100
s.f.

Difference in
base fee
Current
Fee
Full cost using
% change
needed
Suggested
Base Fee
Current Fee
for Each
Additional
100 s.f.

Full Cost
using ICC
per sq ft
Suggested Fee
for Each
Additional 100
s.f.

Difference in
base fee

CITY OF COVINA

CONSOLIDATED SCHEDULE OF NEW CONSTRUCTION FEES (P/C PROCESSING AND INSPECTION COMBINED) (All Construction Types)

NEW CONSTRUCTION
Types IA Types IB, IIA, IIIA, VA Types IIB, IIIB, IV, VB 20,000 $3,732 $4,314.25 $4,314.25 $3.16 $3.65 $3.65 $582.25 $3,110 $3,595.21 $3,595.21 $2.63 $3.04 $3.04 $485.21 $2,488 $2,876.17 $2,876.17 $2.10 $2.43 $2.43 $388.1740,000 $4,363 $5,043.70 $5,043.70 $1.23 $1.42 $1.42 $680.70 $3,636 $4,203.27 $4,203.27 $1.02 $1.18 $1.18 $567.27 $2,909 $3,362.85 $3,362.85 $0.82 $0.95 $0.95 $453.85 100,000 $5,100 $5,895.68 $5,895.68 $1.67 $1.93 $1.93 $795.68 $4,250 $4,913.07 $4,913.07 $1.39 $1.61 $1.61 $663.07 $3,400 $3,930.45 $3,930.45 $1.11 $1.28 $1.28 $530.45200,000 $6,768 $7,823.92 $7,823.92 $3.38 $3.91 $3.91 $1,055.92 $5,640 $6,519.93 $6,519.93 $2.82 $3.26 $3.26 $879.93 $4,512 $5,215.94 $5,215.94 $2.26 $2.61 $2.61 $703.94 F-1 Woodworking 500 $2,481 $2,868.08 $2,868.08 $16.01 $18.51 $18.51 $387.08 $2,068 $2,390.64 $2,390.64 $13.34 $15.42 $15.42 $322.64 $1,654 $1,912.05 $1,912.05 $10.68 $12.35 $12.35 $258.05 2,500 $2,802 $3,239.16 $3,239.16 $19.52 $22.57 $22.57 $437.16 $2,335 $2,699.30 $2,699.30 $16.26 $18.80 $18.80 $364.30 $1,868 $2,159.44 $2,159.44 $13.01 $15.04 $15.04 $291.445,000 $3,290 $3,803.29 $3,803.29 $10.98 $12.69 $12.69 $513.29 $2,741 $3,168.64 $3,168.64 $9.15 $10.58 $10.58 $427.64 $2,193 $2,535.14 $2,535.14 $7.32 $8.46 $8.46 $342.14 10,000 $3,839 $4,437.95 $4,437.95 $4.29 $4.96 $4.96 $598.95 $3,199 $3,698.10 $3,698.10 $3.57 $4.13 $4.13 $499.10 $2,559 $2,958.25 $2,958.25 $2.86 $3.31 $3.31 $399.2525,000 $4,481 $5,180.11 $5,180.11 $5.72 $6.61 $6.61 $699.11 $3,734 $4,316.56 $4,316.56 $4.76 $5.50 $5.50 $582.56 $2,988 $3,454.18 $3,454.18 $3.81 $4.40 $4.40 $466.1850,000 $5,910 $6,832.06 $6,832.06 $11.82 $13.66 $13.66 $922.06 $4,925 $5,693.38 $5,693.38 $9.85 $11.39 $11.39 $768.38 $3,940 $4,554.70 $4,554.70 $7.88 $9.11 $9.11 $614.70 F-2 Industrial / Manufacturing 2,000 $3,060 $3,537.41 $3,537.41 $5.08 $5.87 $5.87 $477.41 $2,550 $2,947.84 $2,947.84 $4.23 $4.89 $4.89 $397.84 $2,040 $2,358.27 $2,358.27 $3.39 $3.92 $3.92 $318.27 10,000 $3,467 $4,007.91 $4,007.91 $6.20 $7.17 $7.17 $540.91 $2,889 $3,339.73 $3,339.73 $5.17 $5.98 $5.98 $450.73 $2,311 $2,671.55 $2,671.55 $4.14 $4.79 $4.79 $360.5520,000 $4,087 $4,724.64 $4,724.64 $3.49 $4.03 $4.03 $637.64 $3,406 $3,937.39 $3,937.39 $2.91 $3.36 $3.36 $531.39 $2,725 $3,150.14 $3,150.14 $2.33 $2.69 $2.69 $425.1440,000 $4,786 $5,532.69 $5,532.69 $1.34 $1.55 $1.55 $746.69 $3,988 $4,610.19 $4,610.19 $1.12 $1.29 $1.29 $622.19 $3,190 $3,687.69 $3,687.69 $0.90 $1.04 $1.04 $497.69 100,000 $5,592 $6,464.44 $6,464.44 $1.82 $2.10 $2.10 $872.44 $4,660 $5,387.04 $5,387.04 $1.52 $1.76 $1.76 $727.04 $3,728 $4,309.63 $4,309.63 $1.22 $1.41 $1.41 $581.63200,000 $7,416 $8,573.02 $8,573.02 $3.71 $4.29 $4.29 $1,157.02 $6,180 $7,144.18 $7,144.18 $3.09 $3.57 $3.57 $964.18 $4,944 $5,715.34 $5,715.34 $2.47 $2.86 $2.86 $771.34 H-2 Moderate Explosion Hazards 200 $2,214 $2,559.42 $2,559.42 $36.03 $41.65 $41.65 $345.42 $1,845 $2,132.85 $2,132.85 $30.03 $34.72 $34.72 $287.85 $1,476 $1,706.28 $1,706.28 $24.02 $27.77 $27.77 $230.28 1,000 $2,502 $2,892.35 $2,892.35 $43.93 $50.78 $50.78 $390.35 $2,085 $2,410.29 $2,410.29 $36.61 $42.32 $42.32 $325.29 $1,668 $1,928.23 $1,928.23 $29.29 $33.86 $33.86 $260.232,000 $2,941 $3,399.84 $3,399.84 $24.72 $28.58 $28.58 $458.84 $2,451 $2,833.40 $2,833.40 $20.60 $23.81 $23.81 $382.40 $1,961 $2,266.95 $2,266.95 $16.48 $19.05 $19.05 $305.954,000 $3,436 $3,972.07 $3,972.07 $9.60 $11.10 $11.10 $536.07 $2,863 $3,309.67 $3,309.67 $8.00 $9.25 $9.25 $446.67 $2,291 $2,648.43 $2,648.43 $6.40 $7.40 $7.40 $357.43 10,000 $4,012 $4,637.94 $4,637.94 $12.90 $14.91 $14.91 $625.94 $3,343 $3,864.56 $3,864.56 $10.75 $12.43 $12.43 $521.56 $2,674 $3,091.19 $3,091.19 $8.60 $9.94 $9.94 $417.1920,000 $5,302 $6,129.20 $6,129.20 $26.51 $30.65 $30.65 $827.20 $4,418 $5,107.28 $5,107.28 $22.09 $25.54 $25.54 $689.28 $3,534 $4,085.36 $4,085.36 $17.67 $20.43 $20.43 $551.36 H-4 Repair Garage 1,000 $2,385 $2,757.10 $2,757.10 $7.80 $9.02 $9.02 $372.10 $1,988 $2,298.16 $2,298.16 $6.50 $7.51 $7.51 $310.16 $1,590 $1,838.07 $1,838.07 $5.20 $6.01 $6.01 $248.07 5,000 $2,698 $3,118.93 $3,118.93 $9.53 $11.02 $11.02 $420.93 $2,248 $2,598.72 $2,598.72 $7.94 $9.18 $9.18 $350.72 $1,798 $2,078.52 $2,078.52 $6.35 $7.34 $7.34 $280.52 10,000 $3,174 $3,669.20 $3,669.20 $5.34 $6.17 $6.17 $495.20 $2,645 $3,057.66 $3,057.66 $4.45 $5.14 $5.14 $412.66 $2,116 $2,446.13 $2,446.13 $3.56 $4.12 $4.12 $330.1320,000 $3,708 $4,286.51 $4,286.51 $2.08 $2.40 $2.40 $578.51 $3,090 $3,572.09 $3,572.09 $1.73 $2.00 $2.00 $482.09 $2,472 $2,857.67 $2,857.67 $1.39 $1.61 $1.61 $385.6750,000 $4,332 $5,007.86 $5,007.86 $2.81 $3.25 $3.25 $675.86 $3,610 $4,173.22 $4,173.22 $2.34 $2.71 $2.71 $563.22 $2,888 $3,338.57 $3,338.57 $1.87 $2.16 $2.16 $450.57 100,000 $5,736 $6,630.91 $6,630.91 $5.74 $6.64 $6.64 $894.91 $4,780 $5,525.76 $5,525.76 $4.78 $5.53 $5.53 $745.76 $3,824 $4,420.61 $4,420.61 $3.82 $4.42 $4.42 $596.61 I-1.1 Nursery - Full-Time (5+) 200 $2,267 $2,620.69 $2,620.69 $36.29 $41.95 $41.95 $353.69 $1,889 $2,183.71 $2,183.71 $30.24 $34.96 $34.96 $294.71 $1,511 $1,746.74 $1,746.74 $24.19 $27.96 $27.96 $235.74 1,000 $2,557 $2,955.93 $2,955.93 $44.22 $51.12 $51.12 $398.93 $2,131 $2,463.47 $2,463.47 $36.85 $42.60 $42.60 $332.47 $1,705 $1,971.01 $1,971.01 $29.48 $34.08 $34.08 $266.012,000 $2,999 $3,466.89 $3,466.89 $24.87 $28.75 $28.75 $467.89 $2,500 $2,890.04 $2,890.04 $20.73 $23.96 $23.96 $390.04 $2,000 $2,312.03 $2,312.03 $16.58 $19.17 $19.17 $312.034,000 $3,497 $4,042.59 $4,042.59 $9.67 $11.18 $11.18 $545.59 $2,914 $3,368.63 $3,368.63 $8.06 $9.32 $9.32 $454.63 $2,331 $2,694.67 $2,694.67 $6.45 $7.46 $7.46 $363.67 10,000 $4,077 $4,713.08 $4,713.08 $12.99 $15.02 $15.02 $636.08 $3,398 $3,928.14 $3,928.14 $10.83 $12.52 $12.52 $530.14 $2,718 $3,142.05 $3,142.05 $8.66 $10.01 $10.01 $424.0520,000 $5,376 $6,214.74 $6,214.74 $26.88 $31.07 $31.07 $838.74 $4,480 $5,178.95 $5,178.95 $22.40 $25.89 $25.89 $698.95 $3,584 $4,143.16 $4,143.16 $17.92 $20.72 $20.72 $559.16 I-1.2 Health Care Centers 1,000 $3,411 $3,943.17 $3,943.17 $11.25 $13.01 $13.01 $532.17 $2,842 $3,285.40 $3,285.40 $9.38 $10.84 $10.84 $443.40 $2,274 $2,628.78 $2,628.78 $7.50 $8.67 $8.67 $354.78 5,000 $3,861 $4,463.38 $4,463.38 $13.74 $15.88 $15.88 $602.38 $3,218 $3,720.06 $3,720.06 $11.45 $13.24 $13.24 $502.06 $2,574 $2,975.59 $2,975.59 $9.16 $10.59 $10.59 $401.59 10,000 $4,548 $5,257.56 $5,257.56 $7.71 $8.91 $8.91 $709.56 $3,790 $4,381.30 $4,381.30 $6.43 $7.43 $7.43 $591.30 $3,032 $3,505.04 $3,505.04 $5.14 $5.94 $5.94 $473.0420,000 $5,319 $6,148.85 $6,148.85 $3.00 $3.47 $3.47 $829.85 $4,433 $5,124.62 $5,124.62 $2.50 $2.89 $2.89 $691.62 $3,546 $4,099.23 $4,099.23 $2.00 $2.31 $2.31 $553.2350,000 $6,218 $7,188.11 $7,188.11 $4.04 $4.67 $4.67 $970.11 $5,181 $5,989.32 $5,989.32 $3.36 $3.88 $3.88 $808.32 $4,145 $4,791.69 $4,791.69 $2.69 $3.11 $3.11 $646.69 100,000 $8,235 $9,519.79 $9,519.79 $8.24 $9.53 $9.53 $1,284.79 $6,863 $7,933.74 $7,933.74 $6.86 $7.93 $7.93 $1,070.74 $5,490 $6,346.53 $6,346.53 $5.49 $6.35 $6.35 $856.53 I-2 Nursing Home / Assisted Living 1,000 $3,482 $4,025.25 $4,025.25 $11.51 $13.31 $13.31 $543.25 $2,902 $3,354.76 $3,354.76 $9.59 $11.09 $11.09 $452.76 $2,322 $2,684.27 $2,684.27 $7.67 $8.87 $8.87 $362.27 5,000 $3,943 $4,558.17 $4,558.17 $14.03 $16.22 $16.22 $615.17 $3,286 $3,798.67 $3,798.67 $11.69 $13.51 $13.51 $512.67 $2,629 $3,039.17 $3,039.17 $9.35 $10.81 $10.81 $410.17 10,000 $4,644 $5,368.54 $5,368.54 $7.89 $9.12 $9.12 $724.54 $3,870 $4,473.78 $4,473.78 $6.58 $7.61 $7.61 $603.78 $3,096 $3,579.03 $3,579.03 $5.26 $6.08 $6.08 $483.0320,000 $5,433 $6,280.64 $6,280.64 $3.07 $3.55 $3.55 $847.64 $4,528 $5,234.44 $5,234.44 $2.55 $2.95 $2.95 $706.44 $3,622 $4,187.09 $4,187.09 $2.04 $2.36 $2.36 $565.0950,000 $6,353 $7,344.17 $7,344.17 $4.13 $4.77 $4.77 $991.17 $5,294 $6,119.95 $6,119.95 $3.44 $3.98 $3.98 $825.95 $4,235 $4,895.73 $4,895.73 $2.75 $3.18 $3.18 $660.73 100,000 $8,415 $9,727.88 $9,727.88 $8.42 $9.73 $9.73 $1,312.88 $7,013 $8,107.14 $8,107.14 $7.01 $8.10 $8.10 $1,094.14 $5,610 $6,485.25 $6,485.25 $5.61 $6.49 $6.49 $875.25 M Department Stores 1,000 $2,202 $2,545.55 $2,545.55 $7.17 $8.29 $8.29 $343.55 $1,835 $2,121.29 $2,121.29 $5.98 $6.91 $6.91 $286.29 $1,468 $1,697.03 $1,697.03 $4.78 $5.53 $5.53 $229.03 5,000 $2,489 $2,877.32 $2,877.32 $8.72 $10.08 $10.08 $388.32 $2,075 $2,398.73 $2,398.73 $7.27 $8.40 $8.40 $323.73 $1,660 $1,918.99 $1,918.99 $5.82 $6.73 $6.73 $258.99 10,000 $2,926 $3,382.50 $3,382.50 $4.92 $5.69 $5.69 $456.50 $2,438 $2,818.37 $2,818.37 $4.10 $4.74 $4.74 $380.37 $1,950 $2,254.23 $2,254.23 $3.28 $3.79 $3.79 $304.2320,000 $3,418 $3,951.26 $3,951.26 $1.91 $2.21 $2.21 $533.26 $2,848 $3,292.33 $3,292.33 $1.59 $1.84 $1.84 $444.33 $2,278 $2,633.40 $2,633.40 $1.27 $1.47 $1.47 $355.4050,000 $3,990 $4,612.50 $4,612.50 $2.56 $2.96 $2.96 $622.50 $3,325 $3,843.75 $3,843.75 $2.13 $2.46 $2.46 $518.75 $2,660 $3,075.00 $3,075.00 $1.70 $1.97 $1.97 $415.00 100,000 $5,268 $6,089.89 $6,089.89 $5.27 $6.09 $6.09 $821.89 $4,390 $5,074.91 $5,074.91 $4.39 $5.07 $5.07 $684.91 $3,512 $4,059.93 $4,059.93 $3.51 $4.06 $4.06 $547.93 M Shopping centers, Markets (Retail) 1,000 $2,608 $3,014.89 $3,014.89 $8.68 $10.03 $10.03 $406.89 $2,173 $2,512.02 $2,512.02 $7.23 $8.36 $8.36 $339.02 $1,738 $2,009.16 $2,009.16 $5.78 $6.68 $6.68 $271.16 5,000 $2,955 $3,416.03 $3,416.03 $10.57 $12.22 $12.22 $461.03 $2,462 $2,846.11 $2,846.11 $8.81 $10.18 $10.18 $384.11 $1,970 $2,277.35 $2,277.35 $7.05 $8.15 $8.15 $307.35 10,000 $3,483 $4,026.40 $4,026.40 $5.95 $6.88 $6.88 $543.40 $2,902 $3,354.76 $3,354.76 $4.96 $5.73 $5.73 $452.76 $2,322 $2,684.27 $2,684.27 $3.97 $4.59 $4.59 $362.2720,000 $4,078 $4,714.23 $4,714.23 $2.31 $2.67 $2.67 $636.23 $3,398 $3,928.14 $3,928.14 $1.92 $2.22 $2.22 $530.14 $2,719 $3,143.21 $3,143.21 $1.54 $1.78 $1.78 $424.2150,000 $4,770 $5,514.20 $5,514.20 $3.12 $3.61 $3.61 $744.20 $3,975 $4,595.16 $4,595.16 $2.60 $3.01 $3.01 $620.16 $3,180 $3,676.13 $3,676.13 $2.08 $2.40 $2.40 $496.13 100,000 $6,330 $7,317.58 $7,317.58 $6.33 $7.32 $7.32 $987.58 $5,275 $6,097.99 $6,097.99 $5.27 $6.09 $6.09 $822.99 $4,220 $4,878.39 $4,878.39 $4.22 $4.88 $4.88 $658.39 R-1 Apartment Buildings 1,000 $3,358 $3,881.90 $3,881.90 $11.21 $12.96 $12.96 $523.90 $2,798 $3,234.53 $3,234.53 $9.35 $10.81 $10.81 $436.53 $2,239 $2,588.32 $2,588.32 $7.48 $8.65 $8.65 $349.32 5,000 $3,806 $4,399.80 $4,399.80 $13.66 $15.79 $15.79 $593.80 $3,172 $3,666.88 $3,666.88 $11.38 $13.16 $13.16 $494.88 $2,538 $2,933.97 $2,933.97 $9.10 $10.52 $10.52 $395.97 10,000 $4,489 $5,189.36 $5,189.36 $7.69 $8.89 $8.89 $700.36 $3,741 $4,324.66 $4,324.66 $6.41 $7.41 $7.41 $583.66 $2,993 $3,459.96 $3,459.96 $5.13 $5.93 $5.93 $466.9620,000 $5,258 $6,078.33 $6,078.33 $2.99 $3.46 $3.46 $820.33 $4,382 $5,065.66 $5,065.66 $2.49 $2.88 $2.88 $683.66 $3,506 $4,052.99 $4,052.99 $1.99 $2.30 $2.30 $546.9950,000 $6,156 $7,116.44 $7,116.44 $4.01 $4.64 $4.64 $960.44 $5,130 $5,930.36 $5,930.36 $3.34 $3.86 $3.86 $800.36 $4,104 $4,744.29 $4,744.29 $2.67 $3.09 $3.09 $640.29 100,000 $8,160 $9,433.09 $9,433.09 $8.16 $9.43 $9.43 $1,273.09 $6,800 $7,860.91 $7,860.91 $6.80 $7.86 $7.86 $1,060.91 $5,440 $6,288.73 $6,288.73 $5.44 $6.29 $6.29 $848.73 R-1 Hotels & Motels 1,000 $3,358 $3,881.90 $3,881.90 $11.21 $12.96 $12.96 $523.90 $2,798 $3,234.53 $3,234.53 $9.35 $10.81 $10.81 $436.53 $2,239 $2,588.32 $2,588.32 $7.48 $8.65 $8.65 $349.32 5,000 $3,806 $4,399.80 $4,399.80 $13.66 $15.79 $15.79 $593.80 $3,172 $3,666.88 $3,666.88 $11.38 $13.16 $13.16 $494.88 $2,538 $2,933.97 $2,933.97 $9.10 $10.52 $10.52 $395.97 10,000 $4,489 $5,189.36 $5,189.36 $7.69 $8.89 $8.89 $700.36 $3,741 $4,324.66 $4,324.66 $6.41 $7.41 $7.41 $583.66 $2,993 $3,459.96 $3,459.96 $5.13 $5.93 $5.93 $466.9620,000 $5,258 $6,078.33 $6,078.33 $2.99 $3.46 $3.46 $820.33 $4,382 $5,065.66 $5,065.66 $2.49 $2.88 $2.88 $683.66 $3,506 $4,052.99 $4,052.99 $1.99 $2.30 $2.30 $546.9950,000 $6,156 $7,116.44 $7,116.44 $4.01 $4.64 $4.64 $960.44 $5,130 $5,930.36 $5,930.36 $3.34 $3.86 $3.86 $800.36 $4,104 $4,744.29 $4,744.29 $2.67 $3.09 $3.09 $640.29 100,000 $8,160 $9,433.09 $9,433.09 $8.16 $9.43 $9.43 $1,273.09 $6,800 $7,860.91 $7,860.91 $6.80 $7.86 $7.86 $1,060.91 $5,440 $6,288.73 $6,288.73 $5.44 $6.29 $6.29 $848.73 R-1 Hotels & Motels - Phased Permits 1,000 $2,134 $2,466.94 $2,466.94 $6.92 $8.00 $8.00 $332.94 $1,778 $2,055.40 $2,055.40 $5.77 $6.67 $6.67 $277.40 $1,423 $1,645.01 $1,645.01 $4.62 $5.34 $5.34 $222.01 5,000 $2,411 $2,787.15 $2,787.15 $8.45 $9.77 $9.77 $376.15 $2,009 $2,322.44 $2,322.44 $7.04 $8.14 $8.14 $313.44 $1,607 $1,857.72 $1,857.72 $5.63 $6.51 $6.51 $250.72 10,000 $2,833 $3,274.99 $3,274.99 $4.74 $5.48 $5.48 $441.99 $2,361 $2,729.35 $2,729.35 $3.95 $4.57 $4.57 $368.35 $1,889 $2,183.71 $2,183.71 $3.16 $3.65 $3.65 $294.71 Exhibit
A

Page 420 of 445 ends

UBC
Class Occupancy Type
Project Size
Threshold
Current
Fee
Full Cost using
% change
needed
Suggested
Base Fee
Current Fee
for Each
Additional
100 s.f.

Full Cost
using %
change
needed
Suggested Fee
for Each
Additional 100
s.f.

Difference in
base fee
Current
Fee
Full Cost using
% change
needed
Suggested
Base Fee
Current Fee
for Each
Additional
100 s.f.

Full Cost
using ICC
per sq ft
Suggested Fee
for Each
Additional 100
s.f.

Difference in
base fee
Current
Fee
Full cost using
% change
needed
Suggested
Base Fee
Current Fee
for Each
Additional
100 s.f.

Full Cost
using ICC
per sq ft
Suggested Fee
for Each
Additional 100
s.f.

Difference in
base fee

CITY OF COVINA

CONSOLIDATED SCHEDULE OF NEW CONSTRUCTION FEES (P/C PROCESSING AND INSPECTION COMBINED) (All Construction Types)

NEW CONSTRUCTION
Types IA Types IB, IIA, IIIA, VA Types IIB, IIIB, IV, VB 20,000 $3,307 $3,822.95 $3,822.95 $1.86 $2.15 $2.15 $515.95 $2,756 $3,185.98 $3,185.98 $1.55 $1.79 $1.79 $429.98 $2,205 $2,549.02 $2,549.02 $1.24 $1.43 $1.43 $344.0250,000 $3,864 $4,466.85 $4,466.85 $2.47 $2.86 $2.86 $602.85 $3,220 $3,722.37 $3,722.37 $2.06 $2.38 $2.38 $502.37 $2,576 $2,977.90 $2,977.90 $1.65 $1.91 $1.91 $401.90 100,000 $5,100 $5,895.68 $5,895.68 $5.10 $5.90 $5.90 $795.68 $4,250 $4,913.07 $4,913.07 $4.25 $4.91 $4.91 $663.07 $3,400 $3,930.45 $3,930.45 $3.40 $3.93 $3.93 $530.45 R - 2.1 Group Care, Non-Amb. (6+) 250 $2,397 $2,770.97 $2,770.97 $31.39 $36.29 $36.29 $373.97 $1,997 $2,308.56 $2,308.56 $26.16 $30.24 $30.24 $311.56 $1,598 $1,847.31 $1,847.31 $20.93 $24.20 $24.20 $249.31 1,250 $2,711 $3,133.96 $3,133.96 $38.26 $44.23 $44.23 $422.96 $2,259 $2,611.44 $2,611.44 $31.88 $36.85 $36.85 $352.44 $1,807 $2,088.92 $2,088.92 $25.50 $29.48 $29.48 $281.922,500 $3,189 $3,686.54 $3,686.54 $21.53 $24.89 $24.89 $497.54 $2,658 $3,072.69 $3,072.69 $17.94 $20.74 $20.74 $414.69 $2,126 $2,457.69 $2,457.69 $14.35 $16.59 $16.59 $331.695,000 $3,727 $4,308.47 $4,308.47 $8.36 $9.66 $9.66 $581.47 $3,106 $3,590.59 $3,590.59 $6.97 $8.06 $8.06 $484.59 $2,485 $2,872.70 $2,872.70 $5.58 $6.45 $6.45 $387.70 12,500 $4,355 $5,034.45 $5,034.45 $11.24 $12.99 $12.99 $679.45 $3,629 $4,195.18 $4,195.18 $9.37 $10.83 $10.83 $566.18 $2,903 $3,355.91 $3,355.91 $7.50 $8.67 $8.67 $452.9125,000 $5,760 $6,658.65 $6,658.65 $23.04 $26.63 $26.63 $898.65 $4,800 $5,548.88 $5,548.88 $19.20 $22.20 $22.20 $748.88 $3,840 $4,439.10 $4,439.10 $15.36 $17.76 $17.76 $599.10 R-2.1.1 Group Care, Non-Amb. (1-5) 300 $2,839 $3,281.93 $3,281.93 $30.86 $35.67 $35.67 $442.93 $2,366 $2,735.13 $2,735.13 $25.72 $29.73 $29.73 $369.13 $1,893 $2,188.34 $2,188.34 $20.57 $23.78 $23.78 $295.34 1,500 $3,209 $3,709.66 $3,709.66 $37.64 $43.51 $43.51 $500.66 $2,674 $3,091.19 $3,091.19 $31.36 $36.25 $36.25 $417.19 $2,139 $2,472.72 $2,472.72 $25.09 $29.00 $29.00 $333.723,000 $3,774 $4,362.80 $4,362.80 $21.15 $24.45 $24.45 $588.80 $3,145 $3,635.67 $3,635.67 $17.63 $20.38 $20.38 $490.67 $2,516 $2,908.54 $2,908.54 $14.10 $16.30 $16.30 $392.546,000 $4,408 $5,095.72 $5,095.72 $8.22 $9.50 $9.50 $687.72 $3,674 $4,247.20 $4,247.20 $6.85 $7.92 $7.92 $573.20 $2,939 $3,397.53 $3,397.53 $5.48 $6.33 $6.33 $458.53 15,000 $5,148 $5,951.17 $5,951.17 $11.07 $12.80 $12.80 $803.17 $4,290 $4,959.31 $4,959.31 $9.22 $10.66 $10.66 $669.31 $3,432 $3,967.45 $3,967.45 $7.38 $8.53 $8.53 $535.4530,000 $6,809 $7,871.31 $7,871.31 $22.70 $26.24 $26.24 $1,062.31 $5,674 $6,559.24 $6,559.24 $18.91 $21.86 $21.86 $885.24 $4,539 $5,247.16 $5,247.16 $15.13 $17.49 $17.49 $708.16 R-2.2 Group Care, Ambulatory (6+) 250 $2,397 $2,770.97 $2,770.97 $31.39 $36.29 $36.29 $373.97 $1,997 $2,308.56 $2,308.56 $26.16 $30.24 $30.24 $311.56 $1,598 $1,847.31 $1,847.31 $20.93 $24.20 $24.20 $249.31 1,250 $2,711 $3,133.96 $3,133.96 $38.26 $44.23 $44.23 $422.96 $2,259 $2,611.44 $2,611.44 $31.88 $36.85 $36.85 $352.44 $1,807 $2,088.92 $2,088.92 $25.50 $29.48 $29.48 $281.922,500 $3,189 $3,686.54 $3,686.54 $21.53 $24.89 $24.89 $497.54 $2,658 $3,072.69 $3,072.69 $17.94 $20.74 $20.74 $414.69 $2,126 $2,457.69 $2,457.69 $14.35 $16.59 $16.59 $331.695,000 $3,727 $4,308.47 $4,308.47 $8.36 $9.66 $9.66 $581.47 $3,106 $3,590.59 $3,590.59 $6.97 $8.06 $8.06 $484.59 $2,485 $2,872.70 $2,872.70 $5.58 $6.45 $6.45 $387.70 12,500 $4,355 $5,034.45 $5,034.45 $11.24 $12.99 $12.99 $679.45 $3,629 $4,195.18 $4,195.18 $9.37 $10.83 $10.83 $566.18 $2,903 $3,355.91 $3,355.91 $7.50 $8.67 $8.67 $452.9125,000 $5,760 $6,658.65 $6,658.65 $23.04 $26.63 $26.63 $898.65 $4,800 $5,548.88 $5,548.88 $19.20 $22.20 $22.20 $748.88 $3,840 $4,439.10 $4,439.10 $15.36 $17.76 $17.76 $599.10 R-2.2.1 Group Care, Non-Amb. (1-5) 300 $2,839 $3,281.93 $3,281.93 $30.86 $35.67 $35.67 $442.93 $2,366 $2,735.13 $2,735.13 $25.72 $29.73 $29.73 $369.13 $1,893 $2,188.34 $2,188.34 $20.57 $23.78 $23.78 $295.34 1,500 $3,209 $3,709.66 $3,709.66 $37.64 $43.51 $43.51 $500.66 $2,674 $3,091.19 $3,091.19 $31.36 $36.25 $36.25 $417.19 $2,139 $2,472.72 $2,472.72 $25.09 $29.00 $29.00 $333.723,000 $3,774 $4,362.80 $4,362.80 $21.15 $24.45 $24.45 $588.80 $3,145 $3,635.67 $3,635.67 $17.63 $20.38 $20.38 $490.67 $2,516 $2,908.54 $2,908.54 $14.10 $16.30 $16.30 $392.546,000 $4,408 $5,095.72 $5,095.72 $8.22 $9.50 $9.50 $687.72 $3,674 $4,247.20 $4,247.20 $6.85 $7.92 $7.92 $573.20 $2,939 $3,397.53 $3,397.53 $5.48 $6.33 $6.33 $458.53 15,000 $5,148 $5,951.17 $5,951.17 $11.07 $12.80 $12.80 $803.17 $4,290 $4,959.31 $4,959.31 $9.22 $10.66 $10.66 $669.31 $3,432 $3,967.45 $3,967.45 $7.38 $8.53 $8.53 $535.4530,000 $6,809 $7,871.31 $7,871.31 $22.70 $26.24 $26.24 $1,062.31 $5,674 $6,559.24 $6,559.24 $18.91 $21.86 $21.86 $885.24 $4,539 $5,247.16 $5,247.16 $15.13 $17.49 $17.49 $708.16 R-3 Dwellings - Custom, Models, 1,000 $2,806 $3,243.78 $3,243.78 $13.56 $15.68 $15.68 $437.78 $2,338 $2,702.77 $2,702.77 $11.30 $13.06 $13.06 $364.77 $1,871 $2,162.91 $2,162.91 $9.04 $10.45 $10.45 $291.91 2,000 $2,942 $3,401.00 $3,401.00 $19.37 $22.39 $22.39 $459.00 $2,451 $2,833.40 $2,833.40 $16.14 $18.66 $18.66 $382.40 $1,961 $2,266.95 $2,266.95 $12.91 $14.92 $14.92 $305.953,000 $3,135 $3,624.11 $3,624.11 $54.17 $62.62 $62.62 $489.11 $2,613 $3,020.67 $3,020.67 $45.14 $52.18 $52.18 $407.67 $2,090 $2,416.07 $2,416.07 $36.11 $41.74 $41.74 $326.074,000 $3,677 $4,250.67 $4,250.67 $30.95 $35.78 $35.78 $573.67 $3,064 $3,542.03 $3,542.03 $25.79 $29.81 $29.81 $478.03 $2,451 $2,833.40 $2,833.40 $20.63 $23.85 $23.85 $382.405,000 $3,986 $4,607.88 $4,607.88 $16.25 $18.79 $18.79 $621.88 $3,322 $3,840.29 $3,840.29 $13.54 $15.65 $15.65 $518.29 $2,658 $3,072.69 $3,072.69 $10.83 $12.52 $12.52 $414.69 10,000 $4,799 $5,547.72 $5,547.72 $47.99 $55.48 $55.48 $748.72 $3,999 $4,622.91 $4,622.91 $39.99 $46.23 $46.23 $623.91 $3,199 $3,698.10 $3,698.10 $31.99 $36.98 $36.98 $499.10 R-3 Dwellings - Production Phase 1,000 $1,779 $2,056.55 $2,056.55 $22.74 $26.29 $26.29 $277.55 $1,483 $1,714.37 $1,714.37 $18.95 $21.91 $21.91 $231.37 $1,186 $1,371.04 $1,371.04 $15.16 $17.53 $17.53 $185.04 2,000 $2,007 $2,320.12 $2,320.12 $34.67 $40.08 $40.08 $313.12 $1,672 $1,932.86 $1,932.86 $28.89 $33.40 $33.40 $260.86 $1,338 $1,546.75 $1,546.75 $23.11 $26.72 $26.72 $208.753,000 $2,353 $2,720.11 $2,720.11 $38.99 $45.07 $45.07 $367.11 $1,961 $2,266.95 $2,266.95 $32.49 $37.56 $37.56 $305.95 $1,569 $1,813.79 $1,813.79 $25.99 $30.04 $30.04 $244.794,000 $2,743 $3,170.95 $3,170.95 $45.48 $52.58 $52.58 $427.95 $2,286 $2,642.65 $2,642.65 $37.90 $43.81 $43.81 $356.65 $1,829 $2,114.35 $2,114.35 $30.32 $35.05 $35.05 $285.355,000 $3,198 $3,696.94 $3,696.94 $20.35 $23.52 $23.52 $498.94 $2,665 $3,080.78 $3,080.78 $16.96 $19.61 $19.61 $415.78 $2,132 $2,464.63 $2,464.63 $13.57 $15.69 $15.69 $332.63 10,000 $4,216 $4,873.76 $4,873.76 $42.16 $48.74 $48.74 $657.76 $3,513 $4,061.08 $4,061.08 $35.13 $40.61 $40.61 $548.08 $2,810 $3,248.41 $3,248.41 $28.10 $32.48 $32.48 $438.41 R-3 Dwellings - Alternate Materials 1,000 $2,245 $2,595.26 $2,595.26 $10.85 $12.54 $12.54 $350.26 $1,871 $2,162.91 $2,162.91 $9.04 $10.45 $10.45 $291.91 $1,496 $1,729.40 $1,729.40 $7.23 $8.36 $8.36 $233.40 2,000 $2,353 $2,720.11 $2,720.11 $15.49 $17.91 $17.91 $367.11 $1,961 $2,266.95 $2,266.95 $12.91 $14.92 $14.92 $305.95 $1,569 $1,813.79 $1,813.79 $10.33 $11.94 $11.94 $244.793,000 $2,508 $2,899.29 $2,899.29 $51.06 $59.03 $59.03 $391.29 $2,090 $2,416.07 $2,416.07 $42.55 $49.19 $49.19 $326.07 $1,672 $1,932.86 $1,932.86 $34.04 $39.35 $39.35 $260.864,000 $3,019 $3,490.01 $3,490.01 $24.77 $28.63 $28.63 $471.01 $2,516 $2,908.54 $2,908.54 $20.64 $23.86 $23.86 $392.54 $2,012 $2,325.90 $2,325.90 $16.51 $19.09 $19.09 $313.905,000 $3,266 $3,775.55 $3,775.55 $14.54 $16.81 $16.81 $509.55 $2,722 $3,146.68 $3,146.68 $12.12 $14.01 $14.01 $424.68 $2,178 $2,517.80 $2,517.80 $9.70 $11.21 $11.21 $339.80 10,000 $3,994 $4,617.13 $4,617.13 $39.94 $46.17 $46.17 $623.13 $3,328 $3,847.22 $3,847.22 $33.28 $38.47 $38.47 $519.22 $2,662 $3,077.31 $3,077.31 $26.62 $30.77 $30.77 $415.31 R-3 Manufactured Housing 1,000 $500 $578.01 $578.01 $1.76 $2.03 $2.03 $78.01 $417 $482.06 $482.06 $1.47 $1.70 $1.70 $65.06 $334 $386.11 $386.11 $1.17 $1.35 $1.35 $52.11 5,000 $571 $660.09 $660.09 $2.15 $2.49 $2.49 $89.09 $476 $550.26 $550.26 $1.79 $2.07 $2.07 $74.26 $381 $440.44 $440.44 $1.43 $1.65 $1.65 $59.44 10,000 $678 $783.78 $783.78 $1.20 $1.39 $1.39 $105.78 $565 $653.15 $653.15 $1.00 $1.16 $1.16 $88.15 $452 $522.52 $522.52 $0.80 $0.92 $0.92 $70.5220,000 $798 $922.50 $922.50 $0.47 $0.54 $0.54 $124.50 $665 $768.75 $768.75 $0.39 $0.45 $0.45 $103.75 $532 $615.00 $615.00 $0.31 $0.36 $0.36 $83.0050,000 $938 $1,084.34 $1,084.34 $0.62 $0.72 $0.72 $146.34 $781 $902.85 $902.85 $0.51 $0.59 $0.59 $121.85 $625 $722.51 $722.51 $0.41 $0.47 $0.47 $97.51 100,000 $1,245 $1,439.24 $1,439.24 $1.25 $1.45 $1.45 $194.24 $1,038 $1,199.94 $1,199.94 $1.04 $1.20 $1.20 $161.94 $830 $959.49 $959.49 $0.83 $0.96 $0.96 $129.49 S-1 Mini Storage 1,000 $1,814 $2,097.01 $2,097.01 $5.81 $6.72 $6.72 $283.01 $1,511 $1,746.74 $1,746.74 $4.84 $5.60 $5.60 $235.74 $1,209 $1,397.62 $1,397.62 $3.87 $4.47 $4.47 $188.62 5,000 $2,046 $2,365.21 $2,365.21 $7.08 $8.18 $8.18 $319.21 $1,705 $1,971.01 $1,971.01 $5.90 $6.82 $6.82 $266.01 $1,364 $1,576.81 $1,576.81 $4.72 $5.46 $5.46 $212.81 10,000 $2,400 $2,774.44 $2,774.44 $3.98 $4.60 $4.60 $374.44 $2,000 $2,312.03 $2,312.03 $3.32 $3.84 $3.84 $312.03 $1,600 $1,849.63 $1,849.63 $2.66 $3.08 $3.08 $249.6320,000 $2,798 $3,234.53 $3,234.53 $1.55 $1.79 $1.79 $436.53 $2,332 $2,695.83 $2,695.83 $1.29 $1.49 $1.49 $363.83 $1,866 $2,157.13 $2,157.13 $1.03 $1.19 $1.19 $291.1350,000 $3,264 $3,773.24 $3,773.24 $2.06 $2.38 $2.38 $509.24 $2,720 $3,144.36 $3,144.36 $1.72 $1.99 $1.99 $424.36 $2,176 $2,515.49 $2,515.49 $1.38 $1.60 $1.60 $339.49 100,000 $4,296 $4,966.25 $4,966.25 $4.30 $4.97 $4.97 $670.25 $3,580 $4,138.54 $4,138.54 $3.58 $4.14 $4.14 $558.54 $2,864 $3,310.83 $3,310.83 $2.86 $3.31 $3.31 $446.83 S-1 Moderate Hazard Storage 1,000 $2,443 $2,824.15 $2,824.15 $8.01 $9.26 $9.26 $381.15 $2,036 $2,353.65 $2,353.65 $6.67 $7.71 $7.71 $317.65 $1,628 $1,881.99 $1,881.99 $5.34 $6.17 $6.17 $253.99 5,000 $2,763 $3,194.07 $3,194.07 $9.76 $11.28 $11.28 $431.07 $2,303 $2,662.31 $2,662.31 $8.13 $9.40 $9.40 $359.31 $1,842 $2,129.38 $2,129.38 $6.50 $7.51 $7.51 $287.38 10,000 $3,251 $3,758.21 $3,758.21 $5.48 $6.33 $6.33 $507.21 $2,709 $3,131.65 $3,131.65 $4.57 $5.28 $5.28 $422.65 $2,167 $2,505.09 $2,505.09 $3.66 $4.23 $4.23 $338.0920,000 $3,799 $4,391.71 $4,391.71 $2.14 $2.47 $2.47 $592.71 $3,166 $3,659.95 $3,659.95 $1.78 $2.06 $2.06 $493.95 $2,533 $2,928.19 $2,928.19 $1.42 $1.64 $1.64 $395.1950,000 $4,440 $5,132.71 $5,132.71 $2.88 $3.33 $3.33 $692.71 $3,700 $4,277.26 $4,277.26 $2.40 $2.77 $2.77 $577.26 $2,960 $3,421.81 $3,421.81 $1.92 $2.22 $2.22 $461.81 100,000 $5,880 $6,797.37 $6,797.37 $5.88 $6.80 $6.80 $917.37 $4,900 $5,664.48 $5,664.48 $4.90 $5.66 $5.66 $764.48 $3,920 $4,531.58 $4,531.58 $3.92 $4.53 $4.53 $611.58 S-2 Warehouse 5,000 $3,339 $3,859.94 $3,859.94 $2.21 $2.55 $2.55 $520.94 $2,783 $3,217.19 $3,217.19 $1.84 $2.13 $2.13 $434.19 $2,226 $2,573.29 $2,573.29 $1.47 $1.70 $1.70 $347.29 25,000 $3,780 $4,369.74 $4,369.74 $2.67 $3.09 $3.09 $589.74 $3,150 $3,641.45 $3,641.45 $2.23 $2.58 $2.58 $491.45 $2,520 $2,913.16 $2,913.16 $1.78 $2.06 $2.06 $393.1650,000 $4,448 $5,141.96 $5,141.96 $1.52 $1.76 $1.76 $693.96 $3,706 $4,284.20 $4,284.20 $1.26 $1.46 $1.46 $578.20 $2,965 $3,427.59 $3,427.59 $1.01 $1.17 $1.17 $462.59 100,000 $5,205 $6,017.06 $6,017.06 $0.58 $0.67 $0.67 $812.06 $4,338 $5,014.80 $5,014.80 $0.48 $0.55 $0.55 $676.80 $3,470 $4,011.38 $4,011.38 $0.39 $0.45 $0.45 $541.38250,000 $6,075 $7,022.80 $7,022.80 $0.78 $0.90 $0.90 $947.80 $5,063 $5,852.91 $5,852.91 $0.65 $0.75 $0.75 $789.91 $4,050 $4,681.87 $4,681.87 $0.52 $0.60 $0.60 $631.87500,000 $8,025 $9,277.03 $9,277.03 $1.61 $1.86 $1.86 $1,252.03 $6,688 $7,731.44 $7,731.44 $1.34 $1.55 $1.55 $1,043.44 $5,350 $6,184.69 $6,184.69 $1.07 $1.24 $1.24 $834.69 S-3 Motor Vehicle Fuel Dispensing 200 $2,410 $2,786.00 $2,786.00 $38.78 $44.83 $44.83 $376.00 $2,008 $2,321.28 $2,321.28 $32.32 $37.36 $37.36 $313.28 $1,607 $1,857.72 $1,857.72 $25.85 $29.88 $29.88 $250.72 1,000 $2,720 $3,144.36 $3,144.36 $47.28 $54.66 $54.66 $424.36 $2,267 $2,620.69 $2,620.69 $39.40 $45.55 $45.55 $353.69 $1,813 $2,095.86 $2,095.86 $31.52 $36.44 $36.44 $282.862,000 $3,193 $3,691.16 $3,691.16 $26.60 $30.75 $30.75 $498.16 $2,661 $3,076.16 $3,076.16 $22.16 $25.62 $25.62 $415.16 $2,129 $2,461.16 $2,461.16 $17.73 $20.50 $20.50 $332.164,000 $3,725 $4,306.16 $4,306.16 $10.35 $11.96 $11.96 $581.16 $3,104 $3,588.27 $3,588.27 $8.62 $9.96 $9.96 $484.27 $2,483 $2,870.39 $2,870.39 $6.90 $7.98 $7.98 $387.39 Exhibit
A

Page 421 of 445 ends

UBC
Class Occupancy Type
Project Size
Threshold
Current
Fee
Full Cost using
% change
needed
Suggested
Base Fee
Current Fee
for Each
Additional
100 s.f.

Full Cost
using %
change
needed
Suggested Fee
for Each
Additional 100
s.f.

Difference in
base fee
Current
Fee
Full Cost using
% change
needed
Suggested
Base Fee
Current Fee
for Each
Additional
100 s.f.

Full Cost
using ICC
per sq ft
Suggested Fee
for Each
Additional 100
s.f.

Difference in
base fee
Current
Fee
Full cost using
% change
needed
Suggested
Base Fee
Current Fee
for Each
Additional
100 s.f.

Full Cost
using ICC
per sq ft
Suggested Fee
for Each
Additional 100
s.f.

Difference in
base fee

CITY OF COVINA

CONSOLIDATED SCHEDULE OF NEW CONSTRUCTION FEES (P/C PROCESSING AND INSPECTION COMBINED) (All Construction Types)

NEW CONSTRUCTION
Types IA Types IB, IIA, IIIA, VA Types IIB, IIIB, IV, VB 10,000 $4,346 $5,024.05 $5,024.05 $13.88 $16.05 $16.05 $678.05 $3,621 $4,185.93 $4,185.93 $11.56 $13.36 $13.36 $564.93 $2,897 $3,348.98 $3,348.98 $9.25 $10.69 $10.69 $451.9820,000 $5,733 $6,627.44 $6,627.44 $28.67 $33.14 $33.14 $894.44 $4,778 $5,523.45 $5,523.45 $23.89 $27.62 $27.62 $745.45 $3,822 $4,418.29 $4,418.29 $19.11 $22.09 $22.09 $596.29 S-3 Repair Garage 200 $1,756 $2,029.96 $2,029.96 $28.02 $32.39 $32.39 $273.96 $1,464 $1,692.41 $1,692.41 $23.35 $26.99 $26.99 $228.41 $1,171 $1,353.69 $1,353.69 $18.68 $21.59 $21.59 $182.69 1,000 $1,980 $2,288.91 $2,288.91 $34.18 $39.51 $39.51 $308.91 $1,650 $1,907.43 $1,907.43 $28.48 $32.92 $32.92 $257.43 $1,320 $1,525.94 $1,525.94 $22.78 $26.33 $26.33 $205.942,000 $2,322 $2,684.27 $2,684.27 $19.22 $22.22 $22.22 $362.27 $1,935 $2,236.89 $2,236.89 $16.02 $18.52 $18.52 $301.89 $1,548 $1,789.51 $1,789.51 $12.82 $14.82 $14.82 $241.514,000 $2,707 $3,129.34 $3,129.34 $7.47 $8.64 $8.64 $422.34 $2,256 $2,607.97 $2,607.97 $6.22 $7.19 $7.19 $351.97 $1,804 $2,085.45 $2,085.45 $4.98 $5.76 $5.76 $281.45 10,000 $3,155 $3,647.23 $3,647.23 $10.04 $11.61 $11.61 $492.23 $2,629 $3,039.17 $3,039.17 $8.37 $9.68 $9.68 $410.17 $2,103 $2,431.10 $2,431.10 $6.70 $7.75 $7.75 $328.1020,000 $4,159 $4,807.87 $4,807.87 $20.80 $24.05 $24.05 $648.87 $3,466 $4,006.75 $4,006.75 $17.33 $20.03 $20.03 $540.75 $2,773 $3,205.63 $3,205.63 $13.86 $16.02 $16.02 $432.63 S-4 Parking Garage 1,000 $1,791 $2,070.42 $2,070.42 $5.72 $6.61 $6.61 $279.42 $1,492 $1,724.78 $1,724.78 $4.77 $5.51 $5.51 $232.78 $1,194 $1,380.28 $1,380.28 $3.82 $4.42 $4.42 $186.28 5,000 $2,020 $2,335.15 $2,335.15 $6.98 $8.07 $8.07 $315.15 $1,683 $1,945.58 $1,945.58 $5.82 $6.73 $6.73 $262.58 $1,346 $1,556.00 $1,556.00 $4.66 $5.39 $5.39 $210.00 10,000 $2,369 $2,738.60 $2,738.60 $3.94 $4.55 $4.55 $369.60 $1,974 $2,281.98 $2,281.98 $3.28 $3.79 $3.79 $307.98 $1,579 $1,825.35 $1,825.35 $2.62 $3.03 $3.03 $246.3520,000 $2,762 $3,192.92 $3,192.92 $1.53 $1.77 $1.77 $430.92 $2,302 $2,661.15 $2,661.15 $1.28 $1.48 $1.48 $359.15 $1,842 $2,129.38 $2,129.38 $1.02 $1.18 $1.18 $287.3850,000 $3,222 $3,724.68 $3,724.68 $2.05 $2.37 $2.37 $502.68 $2,685 $3,103.90 $3,103.90 $1.71 $1.98 $1.98 $418.90 $2,148 $2,483.12 $2,483.12 $1.37 $1.58 $1.58 $335.12 100,000 $4,248 $4,910.76 $4,910.76 $4.25 $4.91 $4.91 $662.76 $3,540 $4,092.30 $4,092.30 $3.54 $4.09 $4.09 $552.30 $2,832 $3,273.84 $3,273.84 $2.83 $3.27 $3.27 $441.84 U-1 Agricultural Building 1,000 $2,238 $2,587.16 $2,587.16 $7.16 $8.28 $8.28 $349.16 $1,865 $2,155.97 $2,155.97 $5.96 $6.89 $6.89 $290.97 $1,492 $1,724.78 $1,724.78 $4.77 $5.51 $5.51 $232.78 5,000 $2,525 $2,918.94 $2,918.94 $8.73 $10.09 $10.09 $393.94 $2,104 $2,432.26 $2,432.26 $7.28 $8.42 $8.42 $328.26 $1,683 $1,945.58 $1,945.58 $5.82 $6.73 $6.73 $262.58 10,000 $2,961 $3,422.96 $3,422.96 $4.92 $5.69 $5.69 $461.96 $2,468 $2,853.05 $2,853.05 $4.10 $4.74 $4.74 $385.05 $1,974 $2,281.98 $2,281.98 $3.28 $3.79 $3.79 $307.9820,000 $3,453 $3,991.72 $3,991.72 $1.92 $2.22 $2.22 $538.72 $2,878 $3,327.01 $3,327.01 $1.60 $1.85 $1.85 $449.01 $2,302 $2,661.15 $2,661.15 $1.28 $1.48 $1.48 $359.1550,000 $4,028 $4,656.43 $4,656.43 $2.57 $2.97 $2.97 $628.43 $3,356 $3,879.59 $3,879.59 $2.14 $2.47 $2.47 $523.59 $2,685 $3,103.90 $3,103.90 $1.71 $1.98 $1.98 $418.90 100,000 $5,310 $6,138.45 $6,138.45 $5.31 $6.14 $6.14 $828.45 $4,425 $5,115.37 $5,115.37 $4.43 $5.12 $5.12 $690.37 $3,540 $4,092.30 $4,092.30 $3.54 $4.09 $4.09 $552.30

TENANT IMPROVEMENT
B Office Tenant Improvements 500 $1,940 $2,242.67 $2,242.67 $12.68 $14.66 $14.66 $302.67 $1,617 $1,869.28 $1,869.28 $10.56 $12.21 $12.21 $252.28 $1,294 $1,495.88 $1,495.88 $8.45 $9.77 $9.77 $201.88 2,500 $2,194 $2,536.30 $2,536.30 $15.45 $17.86 $17.86 $342.30 $1,828 $2,113.20 $2,113.20 $12.87 $14.88 $14.88 $285.20 $1,463 $1,691.25 $1,691.25 $10.30 $11.91 $11.91 $228.255,000 $2,580 $2,982.52 $2,982.52 $8.70 $10.06 $10.06 $402.52 $2,150 $2,485.43 $2,485.43 $7.25 $8.38 $8.38 $335.43 $1,720 $1,988.35 $1,988.35 $5.80 $6.70 $6.70 $268.35 10,000 $3,015 $3,485.39 $3,485.39 $3.38 $3.91 $3.91 $470.39 $2,512 $2,903.91 $2,903.91 $2.82 $3.26 $3.26 $391.91 $2,010 $2,323.59 $2,323.59 $2.26 $2.61 $2.61 $313.5925,000 $3,523 $4,072.64 $4,072.64 $4.53 $5.24 $5.24 $549.64 $2,935 $3,392.91 $3,392.91 $3.77 $4.36 $4.36 $457.91 $2,348 $2,714.33 $2,714.33 $3.02 $3.49 $3.49 $366.3350,000 $4,655 $5,381.26 $5,381.26 $9.31 $10.76 $10.76 $726.26 $3,879 $4,484.19 $4,484.19 $7.76 $8.97 $8.97 $605.19 $3,103 $3,587.12 $3,587.12 $6.21 $7.18 $7.18 $484.12 M Retail Tenant Improvements 200 $2,322 $2,684.27 $2,684.27 $38.37 $44.36 $44.36 $362.27 $1,935 $2,236.89 $2,236.89 $31.97 $36.96 $36.96 $301.89 $1,548 $1,789.51 $1,789.51 $25.58 $29.57 $29.57 $241.51 1,000 $2,629 $3,039.17 $3,039.17 $46.77 $54.07 $54.07 $410.17 $2,190 $2,531.68 $2,531.68 $38.97 $45.05 $45.05 $341.68 $1,752 $2,025.34 $2,025.34 $31.18 $36.04 $36.04 $273.342,000 $3,096 $3,579.03 $3,579.03 $26.31 $30.41 $30.41 $483.03 $2,580 $2,982.52 $2,982.52 $21.92 $25.34 $25.34 $402.52 $2,064 $2,386.02 $2,386.02 $17.54 $20.28 $20.28 $322.024,000 $3,622 $4,187.09 $4,187.09 $10.23 $11.83 $11.83 $565.09 $3,019 $3,490.01 $3,490.01 $8.52 $9.85 $9.85 $471.01 $2,415 $2,791.78 $2,791.78 $6.82 $7.88 $7.88 $376.78 10,000 $4,236 $4,896.88 $4,896.88 $13.74 $15.88 $15.88 $660.88 $3,530 $4,080.74 $4,080.74 $11.45 $13.24 $13.24 $550.74 $2,824 $3,264.59 $3,264.59 $9.16 $10.59 $10.59 $440.5920,000 $5,610 $6,485.25 $6,485.25 $28.05 $32.43 $32.43 $875.25 $4,675 $5,404.38 $5,404.38 $23.37 $27.02 $27.02 $729.38 $3,740 $4,323.50 $4,323.50 $18.70 $21.62 $21.62 $583.50 All Other Tenant Improvements 200 $1,995 $2,306.25 $2,306.25 $31.53 $36.45 $36.45 $311.25 $1,663 $1,922.45 $1,922.45 $26.28 $30.38 $30.38 $259.45 $1,330 $1,537.50 $1,537.50 $21.02 $24.30 $24.30 $207.50 1,000 $2,247 $2,597.57 $2,597.57 $38.48 $44.48 $44.48 $350.57 $1,837 $2,123.60 $2,123.60 $32.04 $37.04 $37.04 $286.60 $1,498 $1,731.71 $1,731.71 $25.63 $29.63 $29.63 $233.712,000 $2,632 $3,042.63 $3,042.63 $21.62 $24.99 $24.99 $410.63 $2,193 $2,535.14 $2,535.14 $18.01 $20.82 $20.82 $342.14 $1,755 $2,028.81 $2,028.81 $14.41 $16.66 $16.66 $273.814,000 $3,064 $3,542.03 $3,542.03 $8.41 $9.72 $9.72 $478.03 $2,554 $2,952.47 $2,952.47 $7.00 $8.09 $8.09 $398.47 $2,043 $2,361.74 $2,361.74 $5.60 $6.47 $6.47 $318.74 10,000 $3,569 $4,125.82 $4,125.82 $11.30 $13.06 $13.06 $556.82 $2,974 $3,437.99 $3,437.99 $9.41 $10.88 $10.88 $463.99 $2,379 $2,750.16 $2,750.16 $7.53 $8.70 $8.70 $371.1620,000 $4,698 $5,430.96 $5,430.96 $23.49 $27.15 $27.15 $732.96 $3,915 $4,525.80 $4,525.80 $19.58 $22.63 $22.63 $610.80 $3,132 $3,620.64 $3,620.64 $15.66 $18.10 $18.10 $488.64

SHELL BUILDINGS ONLY
A-2.1 Restaurant 1,000 $2,338 $2,702.77 $2,702.77 $7.50 $8.67 $8.67 $364.77 $1,949 $2,253.08 $2,253.08 $6.25 $7.23 $7.23 $304.08 $1,559 $1,802.23 $1,802.23 $5.00 $5.78 $5.78 $243.23 5,000 $2,639 $3,050.73 $3,050.73 $9.15 $10.58 $10.58 $411.73 $2,199 $2,542.08 $2,542.08 $7.63 $8.82 $8.82 $343.08 $1,759 $2,033.43 $2,033.43 $6.10 $7.05 $7.05 $274.43 10,000 $3,096 $3,579.03 $3,579.03 $5.16 $5.97 $5.97 $483.03 $2,580 $2,982.52 $2,982.52 $4.30 $4.97 $4.97 $402.52 $2,064 $2,386.02 $2,386.02 $3.44 $3.98 $3.98 $322.0220,000 $3,612 $4,175.53 $4,175.53 $2.01 $2.32 $2.32 $563.53 $3,010 $3,479.61 $3,479.61 $1.68 $1.94 $1.94 $469.61 $2,408 $2,783.69 $2,783.69 $1.34 $1.55 $1.55 $375.6950,000 $4,215 $4,872.61 $4,872.61 $2.67 $3.09 $3.09 $657.61 $3,513 $4,061.08 $4,061.08 $2.23 $2.58 $2.58 $548.08 $2,810 $3,248.41 $3,248.41 $1.78 $2.06 $2.06 $438.41 100,000 $5,550 $6,415.89 $6,415.89 $5.55 $6.42 $6.42 $865.89 $4,625 $5,346.57 $5,346.57 $4.63 $5.35 $5.35 $721.57 $3,700 $4,277.26 $4,277.26 $3.70 $4.28 $4.28 $577.26 B Medical Offices 1,000 $2,631 $3,041.48 $3,041.48 $9.21 $10.65 $10.65 $410.48 $2,193 $2,535.14 $2,535.14 $7.67 $8.87 $8.87 $342.14 $1,754 $2,027.65 $2,027.65 $6.14 $7.10 $7.10 $273.65 5,000 $2,999 $3,466.89 $3,466.89 $11.24 $12.99 $12.99 $467.89 $2,499 $2,888.88 $2,888.88 $9.36 $10.82 $10.82 $389.88 $2,000 $2,312.03 $2,312.03 $7.49 $8.66 $8.66 $312.03 10,000 $3,561 $4,116.57 $4,116.57 $6.30 $7.28 $7.28 $555.57 $2,968 $3,431.06 $3,431.06 $5.25 $6.07 $6.07 $463.06 $2,374 $2,744.38 $2,744.38 $4.20 $4.86 $4.86 $370.3820,000 $4,191 $4,844.86 $4,844.86 $2.46 $2.84 $2.84 $653.86 $3,493 $4,037.96 $4,037.96 $2.05 $2.37 $2.37 $544.96 $2,794 $3,229.91 $3,229.91 $1.64 $1.90 $1.90 $435.9150,000 $4,928 $5,696.85 $5,696.85 $3.32 $3.84 $3.84 $768.85 $4,106 $4,746.60 $4,746.60 $2.76 $3.19 $3.19 $640.60 $3,285 $3,797.51 $3,797.51 $2.21 $2.55 $2.55 $512.51 100,000 $6,585 $7,612.37 $7,612.37 $6.59 $7.62 $7.62 $1,027.37 $5,488 $6,344.22 $6,344.22 $5.49 $6.35 $6.35 $856.22 $4,390 $5,074.91 $5,074.91 $4.39 $5.07 $5.07 $684.91 B Office Building 1,000 $2,474 $2,859.98 $2,859.98 $8.66 $10.01 $10.01 $385.98 $2,062 $2,383.71 $2,383.71 $7.21 $8.33 $8.33 $321.71 $1,649 $1,906.27 $1,906.27 $5.77 $6.67 $6.67 $257.27 5,000 $2,820 $3,259.97 $3,259.97 $10.56 $12.21 $12.21 $439.97 $2,354 $2,721.26 $2,721.26 $8.80 $10.17 $10.17 $367.26 $1,880 $2,173.31 $2,173.31 $7.04 $8.14 $8.14 $293.31 10,000 $3,348 $3,870.34 $3,870.34 $5.94 $6.87 $6.87 $522.34 $2,790 $3,225.29 $3,225.29 $4.95 $5.72 $5.72 $435.29 $2,232 $2,580.23 $2,580.23 $3.96 $4.58 $4.58 $348.2320,000 $3,942 $4,557.02 $4,557.02 $2.31 $2.67 $2.67 $615.02 $3,285 $3,797.51 $3,797.51 $1.93 $2.23 $2.23 $512.51 $2,628 $3,038.01 $3,038.01 $1.54 $1.78 $1.78 $410.0150,000 $4,635 $5,358.13 $5,358.13 $3.09 $3.57 $3.57 $723.13 $3,863 $4,465.69 $4,465.69 $2.58 $2.98 $2.98 $602.69 $3,090 $3,572.09 $3,572.09 $2.06 $2.38 $2.38 $482.09 100,000 $6,180 $7,144.18 $7,144.18 $6.18 $7.14 $7.14 $964.18 $5,150 $5,953.48 $5,953.48 $5.15 $5.95 $5.95 $803.48 $4,120 $4,762.79 $4,762.79 $4.12 $4.76 $4.76 $642.79 M Store 1,000 $2,667 $3,083.10 $3,083.10 $8.66 $10.01 $10.01 $416.10 $2,223 $2,569.82 $2,569.82 $7.21 $8.33 $8.33 $346.82 $1,778 $2,055.40 $2,055.40 $5.77 $6.67 $6.67 $277.40 5,000 $3,014 $3,484.23 $3,484.23 $10.56 $12.21 $12.21 $470.23 $2,511 $2,902.76 $2,902.76 $8.80 $10.17 $10.17 $391.76 $2,009 $2,322.44 $2,322.44 $7.04 $8.14 $8.14 $313.44 10,000 $3,542 $4,094.61 $4,094.61 $5.93 $6.86 $6.86 $552.61 $2,951 $3,411.40 $3,411.40 $4.94 $5.71 $5.71 $460.40 $2,361 $2,729.35 $2,729.35 $3.95 $4.57 $4.57 $368.3520,000 $4,134 $4,778.97 $4,778.97 $2.32 $2.68 $2.68 $644.97 $3,445 $3,982.48 $3,982.48 $1.93 $2.23 $2.23 $537.48 $2,756 $3,185.98 $3,185.98 $1.55 $1.79 $1.79 $429.9850,000 $4,830 $5,583.56 $5,583.56 $3.09 $3.57 $3.57 $753.56 $4,025 $4,652.96 $4,652.96 $2.58 $2.98 $2.98 $627.96 $3,220 $3,722.37 $3,722.37 $2.06 $2.38 $2.38 $502.37 100,000 $6,375 $7,369.60 $7,369.60 $6.38 $7.38 $7.38 $994.60 $5,313 $6,141.91 $6,141.91 $5.31 $6.14 $6.14 $828.91 $4,250 $4,913.07 $4,913.07 $4.25 $4.91 $4.91 $663.07 H Lab / R&D 1,000 $2,810 $3,248.41 $3,248.41 $9.15 $10.58 $10.58 $438.41 $2,342 $2,707.39 $2,707.39 $7.62 $8.81 $8.81 $365.39 $1,874 $2,166.37 $2,166.37 $6.10 $7.05 $7.05 $292.37 5,000 $3,176 $3,671.51 $3,671.51 $11.18 $12.92 $12.92 $495.51 $2,647 $3,059.97 $3,059.97 $9.31 $10.76 $10.76 $412.97 $2,118 $2,448.44 $2,448.44 $7.45 $8.61 $8.61 $330.44 10,000 $3,735 $4,317.72 $4,317.72 $6.27 $7.25 $7.25 $582.72 $3,113 $3,598.68 $3,598.68 $5.23 $6.05 $6.05 $485.68 $2,490 $2,878.48 $2,878.48 $4.18 $4.83 $4.83 $388.4820,000 $4,362 $5,042.54 $5,042.54 $2.44 $2.82 $2.82 $680.54 $3,635 $4,202.12 $4,202.12 $2.03 $2.35 $2.35 $567.12 $2,908 $3,361.69 $3,361.69 $1.62 $1.87 $1.87 $453.6950,000 $5,093 $5,887.59 $5,887.59 $3.29 $3.80 $3.80 $794.59 $4,244 $4,906.13 $4,906.13 $2.74 $3.17 $3.17 $662.13 $3,395 $3,924.67 $3,924.67 $2.19 $2.53 $2.53 $529.67 100,000 $6,735 $7,785.77 $7,785.77 $6.74 $7.79 $7.79 $1,050.77 $5,613 $6,488.72 $6,488.72 $5.61 $6.49 $6.49 $875.72 $4,490 $5,190.51 $5,190.51 $4.49 $5.19 $5.19 $700.51 All Other Shell Buildings 1,000 $2,667 $3,083.10 $3,083.10 $8.66 $10.01 $10.01 $416.10 $2,223 $2,569.82 $2,569.82 $7.21 $8.33 $8.33 $346.82 $1,778 $2,055.40 $2,055.40 $5.77 $6.67 $6.67 $277.40 Exhibit
A

Page 422 of 445 ends

UBC
Class Occupancy Type
Project Size
Threshold
Current
Fee
Full Cost using
% change
needed
Suggested
Base Fee
Current Fee
for Each
Additional
100 s.f.

Full Cost
using %
change
needed
Suggested Fee
for Each
Additional 100
s.f.

Difference in
base fee
Current
Fee
Full Cost using
% change
needed
Suggested
Base Fee
Current Fee
for Each
Additional
100 s.f.

Full Cost
using ICC
per sq ft
Suggested Fee
for Each
Additional 100
s.f.

Difference in
base fee
Current
Fee
Full cost using
% change
needed
Suggested
Base Fee
Current Fee
for Each
Additional
100 s.f.

Full Cost
using ICC
per sq ft
Suggested Fee
for Each
Additional 100
s.f.

Difference in
base fee

CITY OF COVINA

CONSOLIDATED SCHEDULE OF NEW CONSTRUCTION FEES (P/C PROCESSING AND INSPECTION COMBINED) (All Construction Types)

NEW CONSTRUCTION
Types IA Types IB, IIA, IIIA, VA Types IIB, IIIB, IV, VB 5,000 $3,014 $3,484.23 $3,484.23 $10.56 $12.21 $12.21 $470.23 $2,511 $2,902.76 $2,902.76 $8.80 $10.17 $10.17 $391.76 $2,009 $2,322.44 $2,322.44 $7.04 $8.14 $8.14 $313.44 10,000 $3,542 $4,094.61 $4,094.61 $5.93 $6.86 $6.86 $552.61 $2,951 $3,411.40 $3,411.40 $4.94 $5.71 $5.71 $460.40 $2,361 $2,729.35 $2,729.35 $3.95 $4.57 $4.57 $368.3520,000 $4,134 $4,778.97 $4,778.97 $2.32 $2.68 $2.68 $644.97 $3,445 $3,982.48 $3,982.48 $1.93 $2.23 $2.23 $537.48 $2,756 $3,185.98 $3,185.98 $1.55 $1.79 $1.79 $429.9850,000 $4,830 $5,583.56 $5,583.56 $3.09 $3.57 $3.57 $753.56 $4,025 $4,652.96 $4,652.96 $2.58 $2.98 $2.98 $627.96 $3,220 $3,722.37 $3,722.37 $2.06 $2.38 $2.38 $502.37 100,000 $6,375 $7,369.60 $7,369.60 $6.38 $7.38 $7.38 $994.60 $5,313 $6,141.91 $6,141.91 $5.31 $6.14 $6.14 $828.91 $4,250 $4,913.07 $4,913.07 $4.25 $4.91 $4.91 $663.07 * Each additional 100 square feet, or portion thereof, up to the next highest project size threshold. These costs are multi-variable blended rates, so they may not follow a specific pattern or trend. See Final Report for a detailed description.

Exhibit
A

Page 423 of 445 ends

PLANNING FEES
# Title Current Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ 1 Additional Review Fee Actual Cost NA NA Actual Cost $0 2 Administrative Conditional Use Permit: Special Event (ACUP - Category 2) $105.00 $656.69 1% $650.00 $5453 Administrative Conditional Use Permit: Special Event such as Carnival, Car Show, K-Run, Small Scale Auto Sales, etc.4 Carnival, Car Show (ACUP - Catergory 3 - based on event intensity (# of attendees, street closure, or pop-ups) $1,869.00 $2,541.98 0% $2,541.00 $672 5 K-Run, Small Scale Auto Sales, etc. (ACUP - Category 3) $1,869.00 $2,541.98 0% $2,541.00 $672 6 Administrative Conditional Use Permit: Bingo, Las Vegas Nights, etc(. ACUP - Category 2) $158.00 $656.69 1% $650.00 $4927 Administrative Conditional Use Permit: Fee for Non-Profits, etc.(ACUP Category 2) $320.00 No Charge with Verification of IRS Exempt Status $656.69 1% $650.00 $3308 Administrative Conditional Use Permit: Pumpkin Patch & Christmas Tree Lot (over the counter review) (ACUP - Category 1) $225.00 $487.83 8% $450.00 $2259 ABC Investigation w/o CUP $105.00 $100.69 1% $100.00 -$5 10 ABC Investigation with CUP $105.00 $100.69 1% $100.00 -$511 Annexation (City) $10,830.00 $14,463.05 0% $14,463.00 $3,633 12 Annexation (Community Facility District - CFD) Actual Cost NA NA Actual Cost $0 13 Appeal to Planning Commission or City Council $1,699.00 $3,890.20 2% $3,800.00 $2,101 14 Assistant Planner Hourly Rate $61.00 $122.86 38% $76.00 $1515 Associate Planner Hourly Rate $67.59 $135.73 38% $84.00 $1616 Business License Zone Clearance Review (In-Home & Other) Counter Review $105.00 $122.86 1% $122.00 $1717 Business License Zone Clearance Review (Includes In-home and field inspection) $263.00 $245.72 0% $245.00 -$1818 Change in Nonconforming Use $4,134.00 $5,571.89 1% $5,500.00 $1,36619 City Attorney Review of Covenants, Easements, Agreements & Other Legal Documents (Per Hour) Contract Rate NA NA Contract Rate $020 Planning Manager Hourly Rate $88.00 $190.84 0% $190.00 $10221 Community Development Director Hourly Rate $210.00 $279.69 0% $279.00 $6922 Conditional Use Permit $4,134.00 $5,571.89 1% $5,500.00 $1,36623 Conditional Use Permit Modification $2,067.00 $5,571.89 51% $2,750.00 $68324 Conditional Use Permit (New and Modification within Town Center Specific Pl) $2,067.00 $5,571.89 51% $2,750.00 $683 25 PC Review of CUP Compliance $1,289.00 $1,475.40 0% $1,475.00 $186 26 Construction Plan Modification (Changes to Minor Building Plan Check after approval) $266.00 $354.01 0% $354.00 $8827 Construction Plan Review (Major) $266.00 $2,553.34 2% $2,500.00 $2,234 28 Constrction Plan Review (Minor) $266.00 $928.00 1% $920.00 $654 29 Designation of a Heritage Tree (Private Applicant) $5,970.00 $3,385.34 0% $3,385.00 -$2,585 30 Designation of Historic Landmark/Structure of Merit (Private Applicant) - If CEQA required, then additional fee. $5,970.00 $6,500.53 0% $6,500.00 $530 31 Environmental Review - Staff Review of Applicant's Initial Study, Environmental Reports or Studies (Plus Consultant Costs) $4,118.00 Fee is 15% of the total consultant(s) costs + consultant costs; 15% goes to Planning fee account, consultant costs go to deposit account NA NA Consultant Costs plus
15%
NA
32 Environmental Review - City's consultant(s) prepare Initial Study, ND, MND, or EIR. Deposit + Actual Costs Fee is 15% of the total consultant(s) costs + consultant costs; 15% goes to Planning fee account, consultant costs go to deposit account NA NA Consultant Costs plus
15%
NA
33 General Plan Amend - Text or Map Change $10,830.00
Fee is 15% of the total consultant(s) costs + consultant costs; 15% goes to Planning fee account, consultant costs go to deposit account NA NA Consultant Costs plus
15%
NA
34 General Plan Fee $2.00 per $1,000 of Construction Valuation $2.56 NA $2.50 per $1,000 of Construction Valuation $0.50 Exhibit
A

Page 424 of 445 ends

PLANNING FEES
# Title Current Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ 35 Grading Plan Review $266.00 $678.64 1% $670.00 $404
36 Landscape & Construction Review Fee: Artificial Turf Installation or Single-Family Construction $354.00 $714.99 0% $714.00 $36037 Landscape & Construction Review Fee: Project Less Than 1 Acre $620.00 $982.88 0% $980.00 $360 38 Landscape & Construction Review Fee: Project 1.1 Acres to 2.99 Acres $886.00 $1,548.13 3% $1,500.00 $614 39 Landscape & Construction Review Fee: Project Over 3 Acres $1,330.00 $2,905.41 0% $2,900.00 $1,570 40 Lot Line Adjustment $773.00 $905.84 0% $905.00 $132
41 Outdoor Dining and Display - Less than 6 seats (Director's Review) $1,435.00 $782.98 0% $782.00 -$653 42 Outdoor Dining and Display - Less than 6 seats (PC Review) $1,435.00 $2,555.19 2% $2,500.00 $1,06543 Parking Agreement $4,134.00 $4,717.82 0% $4,717.00 $583 44 Photocopies:45 A. Counter information - Each page $0.10 NA NA $0.10 $0 46 B. Filed Information 47 First page $4.00 NA NA $4.00 $0 48 Each additional page $0.10 NA NA $0.10 $0
49 Planned Community Development (Establishment of PCD and Major Modification to PCD) (Boundary change or change precise plan) $10,830.00 $14,463.05 0% $14,463.00 $3,633 50 Planned Community Development (Minor Modification) (Change in COA, land use categories) $1,869.00 $5,571.89 0% $5,571.00 $3,702 51 Planning Technician Hourly Rate $52.00 $100.69 35% $65.00 $13 52 Preliminary Review $632.00
A substantially different project on the same site triggers a new Preliminary Review fee) $6,294.41 1% $6,200.00 $5,568
53 Senior Administrative Technician Hourly Rate $63.00 $101.65 23% $78.75 $16 54 Sign Permit - Permanent $316.00 $592.13 0% $590.00 $274 55 Sign Permit - Temporary $105.00 $346.41 0% $345.00 $240 56 Sign Program Review $1,128.00 $1,920.28 1% $1,900.00 $772 57 Site Plan Review (SPR) Major - applications listed under CMC 17.64.020 (C) $5,417.00 $8,936.60 0% $8,900.00 $3,483 58 Site Plan Review (SPR) Counter - applications listed under CMC 17.64.020(A) $105.00 $201.39 1% $200.00 $9559 Site Plan Review (SPR) Minor, applications listed under CMC 17.64.020(B) except for SB 35 project and construction of an ADU $205.00 $2,202.42 0% $2,200.00 $1,995 60 Plan Review (SPR) for SB 35 projects and Multi-family projects over 10 units $421.00 $8,936.60 0% $8,900.00 $8,47961 Site Plan Review (SPR) minor for ADU not qualify for streamlined building permit process $3,168.00 $837.85 0% $837.00 -$2,331 62 Site Plan Review (SPR) Administrative Time Extension $266.00 $592.13 0% $590.00 $324 63 Site Plan Review (SPR) Planning Commission Time Extension $812.00 $970.18 0% $970.00 $15864 Special Construction Permit (Noise) $177.00 $271.46 1% $270.00 $93 65 Special Plan Review (Lighting, CMD, Parking, etc.) $266.00 $542.91 1% $540.00 $274 66 Tentative Parcel Map $3,769.00 $7,215.46 0% $7,200.00 $3,431 67 Tentative Tract Map $10,830.00 $11,830.23 0% $11,830.00 $1,000 68 Tentative Tract Map/Tentative Parcel Map: Minor Amendment or Time Extension $500.00 $970.18 0% $970.00 $47069 Tree Preservation Permit Minor $1,128.00 $1,377.36 0% $1,377.00 $24970 Tree Preservation Permit Regular $2,504.00 $3,025.73 0% $3,025.00 $521 71 Vacation of Rights-of-Way $450.00 $542.91 0% $542.00 $9272 Variance Major (Non-Single-Family Structure) $4,134.00 $5,571.89 1% $5,500.00 $1,36673 Variance Major (Single-Family) $2,474.00 $3,943.15 1% $3,900.00 $1,426 74 Variance Minor $1,236.00 $974.30 0% $974.00 -$262
75 Verification & Research Fee Actual Cost NA NA Actual Cost $0 76 Zoning Ordinance Amend - Add Uses $4,736.00 $5,571.89 1% $5,500.00 $764 77 Zoning Ordinance Amend - Text or Map Change $10,830.00 (When tied to GPA, then it is included as part of the GPA deposit. If standalone application, then full fee applies) $14,463.05 0% $14,463.00 $3,633 78 Zoning Verification Letter $316.00 $469.27 16% $395.00 $7979 Short-Term Rental Permit (To be determined) New NA NA TBD NA80 Cannabis Permit Fee (To be determined) New NA NA TBD NA Exhibit
A

Page 425 of 445 ends

PLANNING FEES
# Title Current Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ 81 Development Agreement New NA NA Deposit + Actual Costs NA 82 Establishment of new Specific Plan or Major Specific Plan amendment New NA NA Deposit + Actual Costs NA 83 Minor Specific Plan amendment (add land uses, modify development standards) New $5,571.89 1% $5,500.00 NA Exhibit
A

Page 426 of 445 ends

AFFORDABLE HOUSING FEES
# Title
Current
Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ 1 Single Family/Multi-Family:2 Loan subordination New
Applicable to houses bought/sold with affordable housing funds; not applicable to residential rehabilitation projects when the owner is requesting a subordination for a better rate with no cash out $2,175.28 93% $150.00 NA
3 Reconveyance/release New
Applicable to all past and future covenants, but only applicable if there are outstanding loan/grant obligations; not applicable if grant/loan period has expired and no loan/grant balance is due $2,175.28 100% $0.00 NA
4 Loan payoff demand New Applicable to all past and future covenants $2,175.28 100% $0.00 NA 5 Sale of Affordable Housing Units Overseen by City/HA:
6 Fee which applies if the seller tries to sell more than twice in a year New $630.11 92% $50.00 NA7 Fee would also apply if more than two potential buyers per sale attempt are reviewed and are not qualified New $630.11 84% $100.00 NA 8 Project Management Services:
9 Housing Authority of City conduit state or federal loan or grant application submitted on behalf of the developer, IF AND ONLY IF City/HA agree to do so on a case by case basis New NA NA
Actual Costs Based on FBR + Consultants Costs
NA
10 Request for change of project ownership- this would only apply to rental units which are owned by a management company or similar, not individually owned units New NA NA
Actual Costs Based on FBR + Consultants Costs
NA
11 Request for HA Board approval or CC approval except where HA/CC approval is included in another fee for service in this fee schedule New NA NA Actual Costs Based on FBR + Consultants Costs
NA
12 Compliance:

Applicable to any new affordable housing units in the City in which the monitoring is required to be overseen by the City/HA (within legal limits) 13 Application or annual renewal for temporary rental of owner-occupancy restricted unit, unless due to military service New $315.06 0% $315.00 NA14 Request for amendment or revision to existing Regulatory Agreement within approval authority of Executive Director; if HA board or CC approval required, separate fee will apply New $2,042.51 76% $500.00 NA
15 Annual monitoring fee for HA/City subsidized projects (per unit and annual, not applicable for bond projects where City is the issuer). Fee applies to any projects approved after effective date New NA NA
Annual at cost of consultant performing monitoring
NA
16 Annual monitoring fee for projects which include affordable housing monitoring and that preempt local ordinances/zoning codes or impose a monitoring requirement on the locality (i.e. density bonus, SB 4, surplus land/excess lands if applicable, etc.) New NA NA
Annual at cost of consultant performing monitoring
NA
Exhibit
A

Page 427 of 445 ends

CODE ENFORCEMENT FEES
# Title Current Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ 1 Abandoned/Vacant Property Registration Fee $100.00 NA NA $100.00 $02 Appeal of Abatement $333.00 NA NA $333.00 $03 Compliance Inspection/Reinspection Fee $100.00 In excess of 4 inspections NA NA $100.00 $0 4 Rental Inspection Fee (1-3 Units) $126.00 $18 Per Additional Unit NA NA $126.00 $0 5 Street Vendor $400.00 $100 for each employee NA NA $400.00 $06 Shopping Cart Containment/Retrieval Plan Review $654.00 NA NA $654.00 $0 Exhibit
A

Page 428 of 445 ends

POLICE DEPARTMENT FEES
# Title
Current
Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Unit Fee Δ 1 Administrative Tow Fee $129.00 Needs Review (License & Hearing) $144.69 3% $140.00 $112 Bingo Permits $50.00 NA NA $50.00 $0 3 Carnival $2,445.00 $2,681.85 1% $2,650.00 $205
4 CCW Amended License fee $10.00 Per GC 26190 NA NA $10.00 $05 CCW Permit Initial Application $100.00 Per GC 26190/Not to exceed $400.00 $556.45 28% $400.00 $3006 CCW Permit Renewal $25.00 Per GC 26190 NA NA $25.00 $07 Citation Signoffs $25.00 $52.30 43% $30.00 $58 Disturbance Violation Service Fee (Plus Actual Cost of Personnel) Actual Cost NA NA Actual Cost $09 Entertainment Permit 0-49 Live $377.00 Live & Non-Live $648.52 38% $400.00 $23 10 Entertainment Permit 100 & Up Live $1,000.00 Deposit +/- Actual Cost Live & Non-Live $1,123.57 11% $1,000.00 Deposit +/- Actual Cost $0 11 Entertainment Permit 50-99 Live $652.00 Live & Non-Live $784.25 11% $700.00 $48 12 Late Fee for Entertainment Permit
13 15-30 calendar days late New NA NA $50.00 NA14 31-45 calendar days late New NA NA $100.00 NA15 46-90 calendar days late New NA NA $150.00 NA16 Fingerprinting (Plus DOJ Fees) $25.00 Plus DOJ Fees-CCW/Cannabis NA NA $25.00 $017 Local Clearance Letter (Visa, Employment, Personal, etc.) $25.00 $52.71 43% $30.00 $5 18 Location/Premise History Search $0.25 per page $21.08 5% $20.00 per search Varies19 Lost Citation $0.25 per page $17.57 43% $10.00 per citation Varies 20 Outside Employment (Plus Actual Cost of Personnel) Varies Burden Rate for Personnel NA NA Varies $0 21 Overnight Parking Permit - Daily $4.00 NA NA $5.00 $122 Overnight Parking Permit - (Annual) $20.00 NA NA $80.00 $60 23 Private Patrols Operators Invest. (1-5 guards) $475.00 $530.38 10% $475.00 $0 24 Private Patrols Operators Invest. (6 and up guards) $950.00 $1,064.50 11% $950.00 $025 Late Fee for PPO Permit 26 15-30 calendar days late New NA NA $25.00 NA27 31-45 calendar days late New NA NA $50.00 NA28 46-90 calendar days late New NA NA $75.00 NA29 Promoter Permit $500.00 NA NA $500.00 $0 30 Restitution/DUI Reimbursement (Hourly or Fraction Thereof) Actual Cost Per GC 53150-53159; Plus Actual Cost of Personnel at Scene Up to Maximum NA NA Actual Cost $0 31 Second Hand Dealer License $300.00 Online Process Now, matches DOJ Fee $369.51 19% $300.00 $0 32 Second Hand Dealer Renewal $300.00 Online Process Now, matches DOJ Fee $369.51 19% $300.00 $033 Traffic Collision Report - Injury or Non-Injury (Per Report) $20.00 20012 CVC $31.63 5% $30.00 $1034 Vehicle Release $60.00 $161.85 7% $150.00 $90 35 Vehicle Repossessions Entry Receipt $15.00 NA NA $15.00 $0 36 Witness Fees - Civilian $275.00 NA NA $275.00 $037 Witness Fees - Sworn $275.00 NA NA $275.00 $038 Dog License Fees39 Unaltered $60.00 $283.72 65% $100.00 $4040 Altered $20.00 $94.57 68% $30.00 $1041 S/C Unaltered $60.00 $283.72 65% $100.00 $40 42 S/C Altered $7.50 $35.47 72% $10.00 $343 Veteran Disability Altered $7.50 $35.47 79% $7.50 $044 Penalty $60.00 $283.72 82% $50.00 -$10 45 Potentially Dangreous New NA NA $125.00 NA46 Cat License Fees47 Unaltered / S/C Unaltered $5.00 $23.64 58% $10.00 $548 Aletered / S/C Altered $5.00 $23.64 79% $5.00 $0 49 Penalty New NA NA $100.00 NA
Exhibit
A

Page 429 of 445 ends

POLICE DEPARTMENT FEES
# Title
Current
Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Unit Fee Δ 50 Impound Fees51 Dog - 1st Offense Altered $2.00 NA NA $30.00 $2852 Dog - 1st Offense Unaltered $55.00 NA NA $50.00 -$553 Dog - 2nd Offense Altered $4.00 NA NA $70.00 $66 54 Dog - 2nd Offense Unaltered $75.00 NA NA $10.00 -$65 55 Dog - 3rd Offense Altered $60.00 NA NA $120.00 $6056 Dog - 3rd Offense Unaltered $95.00 NA NA $120.00 $2557 Cat - Altered See Above NA NA $5.00 NA58 Cat - Unaltered See Above NA NA $5.00 NA 59 Small Animal $10.00 NA NA $15.00 $560 Medium Animal $10.00 NA NA $25.00 $15 61 Large Animal $10.00 NA NA $60.00 $50
62 Food & Care63 Dog $18.00 $85.12 88% $10.00 -$8
64 Cat $18.00 $85.12 88% $10.00 -$8
65 Small Animal $12.00 $56.74 91% $5.00 -$7
66 Medium Animal $12.00 $56.74 82% $10.00 -$267 Large Animal $12.00 $56.74 30% $40.00 $28 68 Biter (OBS) Animal $18.00 $85.12 77% $20.00 $269 Owner Release - Licensesd70 Per Animal $20.00 $94.57 58% $40.00 $2071 Per Liter $25.00 $118.22 75% $30.00 $572 O/R Pickup Live $30.00 $141.86 79% $30.00 $0 73 O/R Pickup Dead (DOA) $20.00 $94.57 79% $20.00 $0
74 Owner Release - Unlicensed75 Per Animal $40.00 $189.15 47% $100.00 $6076 Per Liter $30.00 $141.86 30% $100.00 $7077 O/R Pickup Live $60.00 $283.72 65% $100.00 $4078 O/R Pickup Dead (DOA) $40.00 $189.15 47% $100.00 $60 Exhibit
A

Page 430 of 445 ends

PARKING VIOLATION CODE AND SCHEDULE OF PENALTIES
# Violation Code Title
Current Violation
Amount Delinq. Amount
Proof of
Correction Notes Full Cost Subsidy %
Suggested Violation
Amount
Suggested Delinq.

Amount
Suggested Proof of
Correction
Violation Amount Fee Δ
Delinq. Amount Fee Δ
Proof of Correction Amount Fee Δ
1 10.32.020 CMC Within Marked Lanes $35.00 $65.00 N/A NA NA $40.00 $70.00 N/A $5 $5 $0 2 10.32.030 CMC Stopping, Standing, Parking Within Parkway $45.00 $75.00 N/A NA NA $50.00 $80.00 N/A $5 $5 $0 3 10.32.040 CMC No Parking Signs $45.00 $75.00 N/A NA NA $50.00 $80.00 N/A $5 $5 $0 4 10.32.050 CMC Posted Temporary No Parking Zone $45.00 $75.00 N/A NA NA $50.00 $80.00 N/A $5 $5 $0 5 10.32.070 CMC Parking Restricted Signed/Curb Marking 1hr, 2hr, 3hr 4hr $45.00 $75.00 N/A NA NA $50.00 $80.00 N/A $5 $5 $06 10.10.32.000 CMC 24 hr Blue Zone $35.00 $65.00 N/A NA NA $40.00 $70.00 N/A $5 $5 $0 7 10.32.110 CMC Unauthorized on City Property $45.00 $75.00 N/A NA NA $50.00 $80.00 N/A $5 $5 $08 10.32.112 A CMC Parking Metere Expired $45.00 $75.00 N/A NA NA $50.00 $80.00 N/A $5 $5 $09 10.32.112 B CMC Pay-by-Space / Pay-and-Display Expired $45.00 $75.00 N/A NA NA $50.00 $80.00 N/A $5 $5 $0 10 10.32.114 B CMC Failure to pay for Space and/or Display Receipt $45.00 $75.00 N/A NA NA $50.00 $80.00 N/A $5 $5 $0 11 10.32.115 A CMC Illegal, Overtime, or Expired Metered Space $45.00 $75.00 N/A NA NA $50.00 $80.00 N/A $5 $5 $012 10.32.115 B CMC Illegal, Overtime, or Expired Pay-by-Space Space $45.00 $75.00 N/A NA NA $50.00 $80.00 N/A $5 $5 $0 13 10.32.115 C CMC Illegal, Overtime, or Expired Pay-by-Display Space $45.00 $75.00 N/A NA NA $50.00 $80.00 N/A $5 $5 $0 14 10.32.120 CMC Parked on Grade without Wheel Blocks $30.00 $60.00 N/A NA NA $35.00 $65.00 N/A $5 $5 $0 15 10.32.140 B CMC Washing or Repairing Vehicle in the Street $45.00 $75.00 N/A NA NA $50.00 $80.00 N/A $5 $5 $0 16 10.32.160 B CMC Temporary/Emergency Signs No Operating, Parking or Standing of Vehicles $45.00 $75.00 N/A NA NA $50.00 $80.00 N/A $5 $5 $0 17 10.32.180 CMC Overnight Parking $45.00 $75.00 N/A NA NA $50.00 $80.00 N/A $5 $5 $018 10.32.190 CMC Commercial Vehicle Parked 30 Minutes or More $70.00 $100.00 N/A NA NA $75.00 $105.00 N/A $5 $5 $0 19 10.32.200 A CMC Parking, Storing Commercial Vehicle in Residential Zone $70.00 $100.00 N/A NA NA $75.00 $105.00 N/A $5 $5 $0 20 10.32.200 B CMC Parking, Storing of Commercial Vehicle $70.00 $100.00 N/A NA NA $75.00 $105.00 N/A $5 $5 $0 21 10.32.210 A CMC Parking or Storing Trailers, Motor Homes, Motor Vehicles Front/Side Yard $45.00 $75.00 N/A NA NA $50.00 $80.00 N/A $5 $5 $022 10.32.220 CMC Must Move 150 ft When Time Limit is Up $45.00 $75.00 N/A NA NA $50.00 $80.00 N/A $5 $5 $0 23 10.36.020 (1) CMC No Parking Red Cub $45.00 $75.00 N/A NA NA $50.00 $80.00 N/A $5 $5 $024 10.36.020 (2) CMC Loading Zone $30.00 $60.00 N/A NA NA $35.00 $65.00 N/A $5 $5 $025 10.36.020 (3) CMC White Curb $30.00 $60.00 N/A NA NA $35.00 $65.00 N/A $5 $5 $0 26 10.36.020 (4) CMC Green Curb $30.00 $60.00 N/A NA NA $35.00 $65.00 N/A $5 $5 $0 27 10.36.050 CMC Passenger Loading and Unloading Zone $45.00 $75.00 N/A NA NA $50.00 $80.00 N/A $5 $5 $0 28 10.36.060 CMC Parking in Alley $35.00 $65.00 N/A NA NA $40.00 $70.00 N/A $5 $5 $0 29 10.36.070 G CMC Bus Zone $45.00 $75.00 N/A NA NA $50.00 $80.00 N/A $5 $5 $0 30 10.36.080 C CMC Taxi Zone $25.00 $55.00 N/A NA NA $30.00 $60.00 N/A $5 $5 $0 31 17.26.110 E CMC Storage Motor Home/Trailer $45.00 $75.00 N/A NA NA $50.00 $80.00 N/A $5 $5 $0 32 21113 (a) VC Unlawful Parking on Public Grounds $40.00 $70.00 N/A NA NA $45.00 $75.00 N/A $5 $5 $033 22500 (a) VC Parking, Standing, Stopping in Intersection $45.00 $75.00 N/A NA NA $50.00 $80.00 N/A $5 $5 $0 34 22500 (b) VC Parking, Standing, Stopping in Crosswalk $45.00 $75.00 N/A NA NA $50.00 $80.00 N/A $5 $5 $0 35 22500 (c) VC Parking, Standing, Stopping in a Safety Zone $45.00 $75.00 N/A NA NA $50.00 $80.00 N/A $5 $5 $0 36 22500 (d) VC Parking, Standing, Stopping Within 15' of Fire Station $45.00 $75.00 N/A NA NA $50.00 $80.00 N/A $5 $5 $0 37 22500 (e) VC Parking, Stanindg, Stopping in Front of Driveway $45.00 $75.00 N/A NA NA $50.00 $80.00 N/A $5 $5 $0 38 22500 (f) VC Parking, Standing, Stopping on a Sidewalk $45.00 $75.00 N/A NA NA $50.00 $80.00 N/A $5 $5 $0 39 22500 (g) VC Parking, Standing, Stopping Alongside Highway Excavation $45.00 $75.00 N/A NA NA $50.00 $80.00 N/A $5 $5 $040 22500 (h) VC Double Parking $45.00 $75.00 N/A NA NA $50.00 $80.00 N/A $5 $5 $0 41 22500 (i) VC Parked in Bus Loading Zone $270.00 $300.00 N/A NA NA $275.00 $305.00 N/A $5 $5 $0 42 22500 (j) VC Parked in Tunnel $45.00 $75.00 N/A NA NA $50.00 $80.00 N/A $5 $5 $043 22500 (k) VC Parking, Stnading, Stopping on Bridge $45.00 $75.00 N/A NA NA $50.00 $80.00 N/A $5 $5 $0 44 22500 (l) VC Blocking Disabled Access Ramp $270.00 $300.00 N/A NA NA $275.00 $305.00 N/A $5 $5 $0 45 22500.1 VC Parking in Fire Lane $70.00 $100.00 N/A NA NA $75.00 $105.00 N/A $5 $5 $0 46 22502 (a) VC Parking More Than 18" from the Curb $45.00 $75.00 N/A NA NA $50.00 $80.00 N/A $5 $5 $047 22507.8 VC Handicapped Zone - Parking in Space $345.00 $375.00 $10.00 NA NA $350.00 $380.00 $10.00 $5 $5 $0 48 22507.8 VC Hnadicapped Zone - Obstructing/Blocking Space $345.00 $375.00 $10.00 NA NA $350.00 $380.00 $10.00 $5 $5 $0 49 22507.8 (c)(1) VC Parking, Standing on the Boundary Lines Designating for Disabled Parking $345.00 $375.00 N/A NA NA $350.00 $380.00 N/A $5 $5 $0 50 22507.8 (c)(2) VC Parking, Standing on the Crosshatched Lines Designating for Disabled Parking $345.00 $375.00 N/A NA NA $350.00 $380.00 N/A $5 $5 $0 51 22514 VC Fire Hydrant Within 15 Feet $45.00 $75.00 N/A NA NA $50.00 $80.00 N/A $5 $5 $052 22515 VC Vehicle Left Unattended on Highway $45.00 $75.00 N/A NA NA $50.00 $80.00 N/A $5 $5 $0 53 22516 VC Locked Vehicle with Person Inside $50.00 $80.00 N/A NA NA $55.00 $85.00 N/A $5 $5 $054 22517 VC Opening and Closing Doors $40.00 $70.00 N/A NA NA $45.00 $75.00 N/A $5 $5 $055 22521 VC Parked Within 7½ ft of RR $50.00 $80.00 N/A NA NA $55.00 $85.00 N/A $5 $5 $0 56 22522 VC Parking on or Within 3' of Access Ramp $295.00 $325.00 N/A NA NA $300.00 $330.00 N/A $5 $5 $0 57 26703 (b) Window Glaze $30.00 $60.00 $10.00 NA NA $35.00 $65.00 $10.00 $5 $5 $0 58 26708 (a)(1) VC Window Tint $70.00 $100.00 $10.00 NA NA $75.00 $105.00 $10.00 $5 $5 $0 59 26708 (a)(2) Window Obstruction $70.00 $100.00 $10.00 NA NA $75.00 $105.00 $10.00 $5 $5 $0 60 26710 VC Cracked Windshield / Rear Window $45.00 $75.00 $10.00 NA NA $50.00 $80.00 $10.00 $5 $5 $0 61 4000 (a)(1) VC No Current Registration $70.00 $100.00 $10.00 NA NA $75.00 $105.00 $10.00 $5 $5 $0 62 40225 (c) VC Equipment Violations with Proof of Correction $0.00 $0.00 $10.00 NA NA $5.00 $0.00 $10.00 $5 $0 $0 63 40226 VC Failure to Display a Disabled Placard - Proof of Valid Placard $0.00 $0.00 $10.00 NA NA $5.00 $0.00 $10.00 $5 $0 $0 Exhibit
A

Page 431 of 445 ends

PARKING VIOLATION CODE AND SCHEDULE OF PENALTIES
# Violation Code Title
Current Violation
Amount Delinq. Amount
Proof of
Correction Notes Full Cost Subsidy %
Suggested Violation
Amount
Suggested Delinq.

Amount
Suggested Proof of
Correction
Violation Amount Fee Δ
Delinq. Amount Fee Δ
Proof of Correction Amount Fee Δ
64 4462 (b) VC Wrong Vehicle Registration $45.00 $75.00 N/A NA NA $50.00 $0.00 N/A $5 -$75 $0 65 5200 (a) VC No Front / Rear License Plate as Issued $45.00 $75.00 $10.00 NA NA $50.00 $0.00 $10.00 $5 -$75 $0 66 5201 VC Unattached / Not Visible License Plates $70.00 $100.00 $10.00 NA NA $75.00 $0.00 $10.00 $5 -$100 $067 5204 (a) VC No Current Month/Year Tabs $80.00 $110.00 $10.00 NA NA $85.00 $0.00 $10.00 $5 -$110 $0 Exhibit
A

Page 432 of 445 ends

CC Regular Meeting

AGENDA ITEM REPORT
ITEM NO. NB 1
Meeting: May 6, 2025
Title: Adoption of Urgency Ordinance Establishing a Temporary Moratorium on Battery Energy Storage Systems (BESS)
Presented by: Brian K. Lee, Deputy City Manager/Community Development Director Recommendation: Request the City Council adopt Ordinance 25-01, entitled “An Urgency Ordinance of the City Council of the City of Covina, California, enacted pursuant to Government Code Section 65858 establishing a moratorium on accepting and processing any new entitlement applications and/or issuing any permits for new Battery Energy Storage Systems (BESS) within the City limits; declaring the urgency thereof and making a determination of exemption under the California Environmental Quality Act”.

EXECUTIVE SUMMARY:

Battery Energy Storage System (BESS) facilities collect energy from the electrical grid, store it, and later discharge that energy to provide electricity or other grid services when needed, particularly during periods of high demand. There is a growing demand for BESS facilities due to the increasing need for renewable electricity, which supports the state's clean energy goals and ensures the reliability of the electric system, among other factors.

However, there have been several recent fires at BESS facilities in California and across the nation. BESS facilities that utilize lithium-ion batteries pose unique fire and explosion hazards. While lithium-ion batteries can be safe and stable when installed correctly, certain conditions can increase the risk of fire and thermal runaways.

These conditions include impact, puncture, or mechanical damage, as well as overcharging, overheating, and short circuits.

Currently, there are no commercial BESS facilities within the city limits of Covina. The City has received two inquiries regarding proposed BESS facilities within the City. The City does not have specific land use policies or standards in place to regulate the location and operation of BESS facilities. This absence of regulation raises concerns related to safety and compatibility with adjacent land uses, among other factors.

Adoption of this urgency ordinance would establish a temporary moratorium, prohibiting grid-scale “Front-ofthe-Meter” BESS facilities in the City while the City studies and considers land use development policies and standards related to BESS facilities. Adoption of this urgency ordinance requires a 4/5 vote of the City Council.

BACKGROUND & DISCUSSION:

BESS Facilities
BESS facilities collect energy from the electrical grid, store it, and later discharge that energy to provide electricity or other grid services when needed, particularly during periods of high demand. A commercial BESS facility refers to one that supplies electricity to third parties. There is a growing demand for BESS facilities due to the increasing need for renewable electricity, which supports the state's clean energy goals and ensures the reliability of the electric system, among other factors.

There have been several recent fires at BESS facilities in California and across the nation. BESS facilities that utilize lithium-ion batteries pose unique fire and explosion hazards. While lithium-ion batteries can be safe and

Page 433 of 445 ends

stable when installed correctly, certain conditions can increase the risk of fire and thermal runaways. These conditions include impact, puncture, or mechanical damage, as well as overcharging, overheating, and short circuits.

BESS Facility Inquiries
In August 2024, one applicant (Covina Reliability) initiated a preliminary application review for the construction and operation of a battery energy storage system situated on a 3.4-acre site comprising five parcels located at 522, 534, and 680 Edna Place. This site falls within the M-1 (Light Manufacturing) Zone. Under the Covina Municipal Code, “Utilities” are a permitted use pursuant to Section 17.54.020(G). This use encompasses electric distribution and public utility substations, as well as electric and public utility transmission substations and service yards, both public and private. In April 2025, the city received additional inquiries regarding the establishment of a second potential BESS facility.

City Lacks Regulations; Safety Concerns
Currently, there are no commercial BESS facilities within the city limits of Covina, and the city does not have specific land use policies or standards in place to regulate the location and operation of BESS facilities. This absence of regulation raises concerns related to safety and compatibility with adjacent land uses, among other factors.

The City of Covina is primarily developed with dense residential and commercial areas. The proposed site for the potential Covina Reliability BESS would be in close proximity to residential townhomes, commercial establishments, light manufacturing operations, and a Metrolink Railway. This situation makes the city particularly vulnerable to hazards such as major fires, explosions, and toxic smoke plumes from BESS facilities.

In response to public safety concerns, city staff have conducted a collaborative review of the potential Covina Reliability BESS project in coordination with the Los Angeles County Fire Department (LACFD). As BESS facilities become more prevalent, the LACFD is actively working to establish regulatory codes and compliance standards to effectively govern their operations. Both the city and the LACFD are collaborating with Covina Reliability to evaluate the project in terms of public safety.

On October 7, 2023, the Governor of California signed Senate Bill 38 (“SB 38”) into law, amending California Public Utilities Code Section 761.3 to address safety concerns associated with BESS projects. Under SB 38, every BESS facility in California is required to establish an emergency response and action plan to protect surrounding residents, neighboring properties, emergency responders, and the environment. The owner or operator of a BESS facility must coordinate with local emergency management agencies, unified program agencies, and local first responders to develop and submit this plan to the county where the facility is located. Currently, the applicant is working to provide the Los Angeles County Fire Department and other response agencies with an emergency response and action plan for their review and approval.

SB 38 recognizes the various hazards that BESS facilities can pose, stating that the mandated emergency response and action plan may address potential offsite impacts such as poor air quality, threats to municipal water supplies, water runoff, and threats to municipal waterways. The plan may also include procedures for shelter-in-place orders and road closure notifications. Presently, the City does not have any procedures or standards for addressing potential off-site impacts related to BESS facilities.

The potential development of new BESS facilities within the City limits, without adequate land use policies and standards in place to implement SB 38, poses an immediate threat to public safety and welfare. Approving land use entitlements for such facilities could lead to potentially catastrophic environmental, safety, and economic impacts.

Page 434 of 445 ends

URGENCY ORDINANCE:

California Government Code Section 65858 provides that, without following the procedures otherwise required prior to the adoption of a zoning ordinance, an urgency measure in the form of an interim ordinance may be adopted by a four-fifth vote of the City Council to protect the public from a current and immediate threat to the public health, safety, or welfare resulting from a contemplated zoning proposal.

Section 65858 further provides that such an urgency measure shall expire 45 days following its adoption; however, such a measure may be extended beyond the initial 45-day period, following compliance with Government Code Section 65868, for an additional 10 months and 15 days, and subsequently for an additional 12 months.

Government Code Section 65858(d) requires the City to issue a written report describing the measures taken to alleviate the condition that led to the adoption of the initial interim ordinance 10 days prior to expiration for purposes of extending the urgency ordinance.

Subsequent to the written report, Government Code Section 65858(a) allows for an initial 10-month and 15-day extension to provide the City with additional time to study the potential impacts of commercial BESS facilities and measures for mitigating the public safety, health and welfare concerns described above.

With the adoption of Urgency Ordinance 25-01, the City Council would effectively prohibit the acceptance and processing of any new entitlement applications and/or the issuance of permits for Battery Energy Storage Systems (BESS) within the city limits, allowing time for the City to research best practices, continue engagement with the LACFD, and consider appropriate policies to address safety concerns while ensuring responsible energy infrastructure planning.

FISCAL IMPACT:

No direct fiscal costs are associated with the adoption of this urgency ordinance.

CEQA (CALIFORNIA ENVIRONMENTAL QUALITY ACT):

The ordinance was reviewed in accordance with the California Environmental Quality Act (CEQA) (Public Resources Code Section 21000 et seq.) and the Guidelines (Cal. Code Regs., tit. 14, §15000 et seq.) The interim ordinance is not subject to CEQA as it prohibits the use and development of BESS facilities in the City while the City studies appropriate regulations and is therefore not expected to lead to any direct or reasonably foreseeable indirect physical changes in the environment. CEQA Guidelines Section 15060(c)(2). Furthermore, this Interim Ordinance exempt from CEQA pursuant to CEQA Guidelines Sections 15061(b)(3) [it can be seen with certainty that there is no possibility the activity in question may have a significant effect on the environment] and CEQA Guidelines Section 15269(c) [exemption for specific actions necessary to prevent or mitigate an emergency]. This ordinance addresses a clear and imminent danger, precluding specified development of BESS facilities in the City to protect life, health, property, and essential public services until appropriate regulations are adopted.

Respectfully submitted,

Page 435 of 445 ends
Page 436 of 445 ends

Senate Bill No. 38
CHAPTER 377
An act to amend Section 761.3 of the Public Utilities Code, relating to energy.
[Approved by Governor October 7, 2023. Filed with Secretary of State October 7, 2023.]
SB 38, Laird. Battery energy storage facilities: emergency response and emergency action plans.

Existing law vests the Public Utilities Commission with regulatory authority over public utilities, including electrical corporations. Existing law requires the commission to implement and enforce standards for the maintenance and operation of facilities for the generation and storage of electricity owned by an electrical corporation or located in the state to ensure their reliable operation.

This bill would require each battery energy storage facility located in the state and subject to the requirement described above to have an emergency response and emergency action plan that covers the premises of the battery energy storage facility, as specified. The bill would require the owner or operator of the facility, in developing the plan, to coordinate with local emergency management agencies, unified program agencies, and local first response agencies. To the extent the bill would impose new duties on local government agencies, the bill would create a state-mandated local program.

The bill would require the owner or operator of the facility to submit the plan to the county and, if applicable, the city where the facility is located.

Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the commission is a crime.

Because the above provisions would be part of the act and a violation of a commission action implementing this bill’s requirements would be a crime, the bill would impose a state-mandated local program.

The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.

This bill would provide that with regard to certain mandates no reimbursement is required by this act for a specified reason.

With regard to any other mandates, this bill would provide that, if the Commission on State Mandates determines that the bill contains costs so mandated by the state, reimbursement for those costs shall be made pursuant to the statutory provisions noted above.
93

Page 437 of 445 ends

ATTACHMENT A
The people of the State of California do enact as follows:

SECTION 1. Section 761.3 of the Public Utilities Code is amended to read:
761.3. (a) Notwithstanding subdivision (g) of Section 216 and subdivision (c) of Section 218.5, the commission shall implement and enforce standards for the maintenance and operation of facilities for the generation and storage of electricity owned by an electrical corporation or located in the state to ensure their reliable operation. The commission shall enforce the protocols for the scheduling of powerplant outages of the Independent System Operator.
(b) This section does not authorize the commission to establish rates for wholesale sales in interstate commerce from those facilities, or to approve the sale or transfer of control of facilities if an exempt wholesale generator, as defined in the federal Public Utility Holding Company Act of 2005 (42 U.S.C. Sec. 16451(6)).
(c) (1) (A) Except as otherwise provided in this subdivision, this section does not apply to nuclear powered generating facilities that are federally regulated and subject to standards developed by the Nuclear Regulatory Commission and that participate as members of the Institute of Nuclear Power Operations.
(B) The owner or operator of a nuclear powered generating facility shall file with the commission an annual schedule of maintenance, including repairs and upgrades, updated quarterly, for each generating facility. The owner or operator of a nuclear powered generating facility shall make good faith efforts to conduct its maintenance in compliance with its filed plan and shall report to the Independent System Operator any significant variations from its filed plan.
(C) The owner or operator of a nuclear powered generating facility shall report on a monthly basis to the commission all actual planned and unplanned outages of each facility during the preceding month. The owner or operator of a nuclear powered generating facility shall report on a daily basis to the Independent System Operator the daily operational status and availability of each facility.
(2) (A) Except as otherwise provided in this subdivision, this section does not apply to a qualifying small power production facility or a qualifying cogeneration facility within the meaning of Sections 201 and 210 of Title 11 of the federal Public Utility Regulatory Policies Act of 1978 (16 U.S.C.

Secs. 796(17), 796(18), and 824a-3), and the regulations adopted pursuant to those sections by the Federal Energy Regulatory Commission (18 C.F.R.

Secs. 292.101 to 292.602, inclusive), nor does this section apply to other generation units installed, operated, and maintained at a customer site exclusively to serve that customer’s load.
(B) An electrical corporation that has a contract with a qualifying small power production facility, or a qualifying cogeneration facility, with a name plate rating of 10 megawatts or greater, shall report to the commission maintenance schedules for each facility, including all actual planned and 93 Ch. 377 — 2 —

Page 438 of 445 ends

unplanned outages of the facility and the daily operational status and availability of the facility. Each facility with a name plate rating of 10 megawatts or greater shall be responsible for directly reporting to the Independent System Operator maintenance schedules for each facility, including all actual planned and unplanned outages of the facility and the daily operational status and availability of the facility, if that information is not provided to the electrical corporation pursuant to a contract. (d) This section shall not result in the modification, delay, or abrogation of any deadline, standard, rule, or regulation adopted by a federal, state, or local agency for the purposes of protecting public health or the environment, including, but not limited to, any requirements imposed by the State Air Resources Board or by an air pollution control district or an air quality management district pursuant to Division 26 (commencing with Section 39000) of the Health and Safety Code. The Independent System Operator shall consult with the State Air Resources Board and the appropriate local air pollution control districts and air quality management districts to coordinate scheduled outages to provide for compliance with those retrofits. (e) The Independent System Operator shall maintain records of generation and storage facility outages and shall provide those records to the commission on a daily basis. Each entity that owns or operates an electric generating unit in California with a rated maximum capacity of 10 megawatts or greater shall provide a monthly report to the Independent System Operator that identifies any periods during the preceding month when the unit was unavailable to produce electricity or was available only at reduced capacity.

The report shall identify the reasons for any such unscheduled unavailability or reduced capacity. The Independent System Operator shall immediately transmit the information to the commission.
(f) This section does not apply to any of the following:
(1) A facility owned by a local publicly owned electric utility. (2) A public agency that may generate electricity incidental to the provision of water or wastewater treatment.
(3) A facility owned by a city and county operating as a public utility, furnishing electric service as provided in Section 10001. (g) (1) In order to ensure the safety of employees, emergency responders, and surrounding communities, each battery energy storage facility located in the state and subject to subdivision (a) shall have an emergency response and emergency action plan that covers the premises of the battery energy storage facility, consistent with Sections 142.3 and 6401 of the Labor Code and any related regulations, including the regulatory requirements applicable to emergency action plans pursuant to Section 3220 of Title 8 of the California Code of Regulations.
(2) The emergency response and emergency action plan shall do all of the following:
(A) Establish response procedures for an equipment malfunction or failure.
(B) Include procedures that provide for the safety of surrounding residents, neighboring properties, emergency responders, and the 93 — 3 — Ch. 377

Page 439 of 445 ends
← All documents from this meeting