Cities Index.
Part C - Crescent City Surge Tank Project Plans

Crescent City City Council
April 7, 2025

Document
Part C - Crescent City Surge Tank Project Plans
Meeting
April 7, 2025
Body
Crescent City City Council
Original file
3.1 MB
Text extracted from the city's file for reading and search. Open the original on evogov.s3.us-west-2.amazonaws.com. That file is the official record.

SHEET LIST

SHEET NUMBER TITLE

GENERAL
G-1 COVER SHEET, VICINITY MAP AND SHEET LISTG-2 ABBREVIATIONS/LEGEND AND GENERAL NOTES CIVIL
C-1 EXISTING SITE PLANC-2 SURGE TANK SITE PLANC-3 SITE CROSS SECTIONS

PROCESS
P-1 SURGE TANK PIPING PLANP-2 SURGE TANK AND PIPING 3D VIEWSP-3 SURGE TANK AND PIPING DETAILSP-4 SURGE TANK DETAILS 1 OF 2P-5 SURGE TANK DETAILS 2 OF 2P-6 AIR COMPRESSOR SYSTEM PLAN AND SECTIONSP-7 MECHANICAL DETAILS 1 OF 2P-8 MECHANICAL DETAILS 2 OF 2

ELECTRICAL
E-1 ELECTRICAL BUILDING AND SITE ELECTRICAL PLAN
Last saved by: PALANDEP(2024-03-21) Last Plotted: 2024-03-21 Filename: C:\USERS\PALANDEP\AECOM\EC INDIA - US WEST WATER SUPPORT - DOCUMENTS\PROJECTS\31. CRESCENT CITY SURGE\_WIP\G-1.DWG

CRESCENT CITY SURGE TANK PROJECT

COVER SHEET, VICINITY MAP AND SHEET LIST
60709509
AECOM 2020 L Street, Suite 300
Sacramento, CA 95811

CRESCENT CITY

SURGE TANK PROJECT

CRESCENT CITY, CALIFORNIA
JANUARY 2024

PREPARED BY

VICINITY
MAP
SOURCE: AERIAL PHOTOGRAPH FROM GOOGLE EARTH
N

SHEET NUMBER
G-1

PROJECT SITE

EXISTING CITY

CONTROL BUILDING

RANNEY PUMP STATION
3/31/26
⅊
X X
W W
SD SD

REGISTRATION

CLIENTCRESCENT CITY,CALIFORNIACONSULTANT

PROJECT

CONSULTANTS
2020 L Street, Suite 300
Sacramento, CA 95811
AECOM

ISSUE/REVISION

SHEET NUMBERSHEET TITLE

PROJECT NUMBER
Designed By:

PROJECT MANAGEMENT INTIALS
Date
Scale:Checked By:

Approved By:

Drawn By:

Last Plotted:

Filename:

Printed on ___% Post-ConsumerRecycled Content Paper
ANSI D 22"x34"
©2018 AECOM Corporation
02-Nov-23 10:39:29 PM
https://aecom.sharepoint.com/:f:/r/sites/60709509-CrescentCitySurge/Shared%20Documents/General/CAD/20-SHEETS?csf=1&web=1&e=vpucCc

WATER SYSTEM SURGE TANK

PROJECT

ABBREVIATIONS/LEGEND AND

GENERAL NOTES
G-2
60709509
G-2-ABBREVIATIONS/LEGEND AND GENERAL NOTESI/R DATE DESCRIPTION As indicated
SH
MR
11/02/2023
HMPP
R0 11/02/2023 ISSUED FOR APPROVAL
3/31/26

DIESEL FUEL TANK

ELECTRICAL TOWER/

CONCRETE PAD

CONCRETE SLAB

CONCRETE PAD

ROOF OVERHANG

REMOVABLE
SCREEN

GENERATOR SKID
EICA

UNIT STANDBY GENERATOR
ROOM

ELECTRICAL ROOM

0.60'

2.50'
PLC-1 PUMP
1 VFD
PUMP

CONTROL
PANEL
PUMP
2 VFD
PUMP
3 VFD
INC
LINE PMP-3 PMP-2 PMP-1CONTROLS

TRANSFFER
SWITCH

MAIN MCC MCC MCC

0.42'

12.50'

10.00' 9.00'

15.75'

17.00' 5.90'

2.07'

19.42'

14.58' 5.10' 16.00'

0.65' 29.30'

60.00'

50.00'

9.00'

50.00'

15.00'

18.12'
N 46° 54' 27" E
S 43° 05' 33" E
S 46° 54' 27" W
N 43° 05' 33" W
EL 45.86'
EL 45.32'
EL 45.57'
EL 45.58'
EL 45.27' EL 45.07'
EL 45.71'
EL 45.87'
EL 45.88'
EL 46.02'
EL 46.38'
EL 46.44' EL 46.36'
EL 46.28'
1 C-3

EXISTING CHAIN LINK

SOUTH BANK ROAD
GATE

EXISTING CHAIN LINK
FENCE
DOOR
TBM 45.00' EL 50.50'

WOOD POLE /

SITE LIGHT AND CONTROL

ABOVE GROUND

ELECTRICAL CONDUITS

CONTROL BUILDING

WATER HOSE BIBB

W / CONSTANTINA WIRE

SWING GATE

REGISTRATION
CLIENT

CONSULTANT

PROJECT

CONSULTANTS
2020 L Street, Suite 300
Sacramento, CA 95811
AECOM

ISSUE/REVISION

SHEET NUMBER

SHEET TITLE

PROJECT NUMBER
Designed By:

PROJECT MANAGEMENT INTIALS
Date
Scale:

Checked By:

Approved By:

Drawn By:

Last Plotted:Filename:

Printed on ___% Post-Consumer
Recycled Content Paper
ANSI D 22"x34"
©2018 AECOM Corporation

CRESCENT CITY,

CALIFORNIA
R0 11/02/2023 ISSUED FOR APPROVAL
3/31/26
1" = 4'
3/21/2024 6:06:57 PM
Autodesk Docs://Test-Demo-US-West-Water/60709509_Civil.rvt

CRESCENT CITY SURGE TANK

PROJECT

EXISTING SITE PLAN
C-1
60709509
SH
MR
11/02/2023
HM
PP
SORT: 08-ARCHITECTURE-08.10-C-1-EXISTING SITE PLAN
SCALE: 1" = 4'
1 EXISTING SITE PLAN
N

SITE NOTES

1. THE CONTRACTOR SHALL MAINTAIN SITE SECURITY AT ALL TIMES DURING CONSTRUCTION. IF REQUIRED, PROVIDE TEMPORARY FENCING TO SECURE THE SITE AND WORK AREAS.

2. REMOVE AND REPLACE IN KIND THE EXISITING LIGHT POLE AND ASSOCIATED

ELECTRICAL SYSTEM NEAR THE ELECTRICAL POWER TOWER FOR
CONSTRUCTION OF NEW 10-INCH PIPELINE.

3. CRESCENT CITY WILL PROVIDE A GEOTECHNICAL ENGINEER TO INSPECT THE SURGE TANK BASE SUBGRADE BEFORE PLACING BASE ROCK AND CONCRETE.

GEOTECHNICAL ENGINEER TO DETERMINE IF NATIVE SOILS ARE SUITABLE AND

ARE PROPERLY COMPACTED TO SUPPORT NEW SURGE TANK AND CONCRETE BASE. IF THE GEOTECHNICAL INSPECTION INDICATES ADDITIONAL SOIL

EXCAVATION AND FILL MATERIAL IS REQUIRED, THE CONTRACTOR WILL BE

PAID FOR EXTRA WORK BASED ON TIME AND MATERIALS RATES NEGOTIATED WITH CITY STAFF. THE GEOTECHNICAL ENGINEER WILL ALSO PROVIDE SOIL COMPACT TESTS.

4. THE CONTRACTOR SHALL HIRE A REGISTERED LAND SURVEY FOR RECORDING

POTHOLED LOCATIONS AND ELEVATIONS OF EXISTING BURIED PIPELINES,

VALVES, CONDUITS AND EXISTING FUEL TANK AND ELECTRICAL TOWER CONCRETE BASES IN THE WORK AREAS. SURVEYOR SHALL PROVIDE A COORDINATE SYSTEM FOR DETAILED LAYOUT OF ALL NEW IMPROVEMENTS.

5. A TEMPORARY SURVEY BENCH MARK (TBM) WAS USED BY CITY STAFF FOR THE SITE ELEVATIONS SHOWN ON THE PLANS. THIS TBM IS LOCATED ON THE ELECTRICAL TOWER CONCRETE BASE WITH AN ELEVATION OF 45 FEET. THE

LICENSED SURVEYOR SHALL PROVIDE A PERMANENT BENCH MARK FOR SETTING ELEVATIONS OF NEW IMPROVEMENTS.

I/R DATE DESCRIPTION
1 C-3
2 C-3

DIESEL FUEL TANK

ELECTRICAL TOWER/

CONCRETE PAD

EXISTING CONCRETE SLAB

CONCRETE PAD

REMOVABLE
SCREEN

STANDBY GENERATOR
ROOM

ELECTRICAL ROOM

0.42'

12.50'

10.00'

9.00'

15.75'

5.90'

17.00'

19.42'

14.58' 5.10' 16.00'

0.65' 29.30'

50.00'

9.00'

50.00'

15.00'

18.12'
N 46° 54' 27" E
S 43° 05' 33" E
S 46° 54' 27" W
N 43° 05' 33" W
EL 45.86'
EL 46.68'

45.32'
EL 45.57'
EL 45.58'

45.50'
EL 46.52' EL 45.87' 45.27' 45.07'
EL 45.88'
EL 46.02'
EL 46.38'

1.00'

2.50'

4.92'
EL 46.44' EL 46.36'
EL 46.28'

SOUTH BANK ROAD

1.00'
24"
ACCESS
M.H

SURGE TANK
DOOR
P-31
P-4S
AIR

RELEASE
VALVE
AIR

CONTROL

STATION

SURGE SYSTEM

PLC / CONTROL
PANEL

MAGNETIC
LEVEL
INDICATOR P-42
P-51

60.00'

13.5' SQUARE CONCRETE BASE P-53
P-41

WOOD POLE /

SITE LIGHT AND CONTROL

POT HOLE EXIST

ELECTRICAL

CONDUITS, TYP
T.O.C EL 45.75'
LEVEL

TRANSMITTER

WATER HOSE BIBB

45.68'
2 1/2" GATE VALVE

BUTTERFLY VALVE
10"⌀ INLET &
OUTLET P-3
PG & PT3

CONTROL BUILDING

PROPOSED SURGE
TANK PLAN P-32

REGISTRATION
CLIENT

CONSULTANT

PROJECT

CONSULTANTS
2020 L Street, Suite 300
Sacramento, CA 95811
AECOM

ISSUE/REVISION

SHEET NUMBER

SHEET TITLE

PROJECT NUMBER
Designed By:

PROJECT MANAGEMENT INTIALS
Date
Scale:

Checked By:

Approved By:

Drawn By:

Last Plotted:Filename:

Printed on ___% Post-Consumer
Recycled Content Paper
ANSI D 22"x34"
©2018 AECOM Corporation

CRESCENT CITY,

CALIFORNIA
R0 11/02/2023 ISSUED FOR APPROVAL
3/31/26
1" = 4'
3/21/2024 6:06:58 PM
Autodesk Docs://Test-Demo-US-West-Water/60709509_Civil.rvt

CRESCENT CITY SURGE TANK

PROJECT

SURGE TANK SITE PLAN
C-2
60709509
SH
MR
11/02/2023
HM
PP
C-2-SURGE TANK SITE PLAN
SCALE: 1" = 4'
1 SURGE TANK SITE PLAN
NOTE:

EXACT LOCATION OF PLC AND AIR CONTROL
PANEL WILL BE PROVIDED BY CITY STAFF.

N

I/R DATE DESCRIPTION

4.92'

2.50'

19.42'

13.50'

19.17'

1.00'

CONTROL BUILDING

EXISTING CONCRETE SLAB

EXISTING ELECTRICAL TOWER

CONCRETE BASE

SURGE TANK

CONCRETE BASE

CHAIN LINK FENCE
9'⌀ SURGE TANK

EXIST GROUND
EL 45.10'
P-3
1 3.80' 9.40'

9.00’ Ø
TOC 45.75'

17.00'

2.50' 1.00'

DIESEL FUEL TANK

ELECTRICAL TOWER /
CONCRETE PAD 9'⌀ SURGE TANK

CONTROL BUILDING
TOC 46.30'

EXIST GROUND
ELEVATION 45.00'

CONCRETE BASE
TOC 45.00'
TBM
SEE NOTE 1

REGISTRATION
CLIENT

CONSULTANT

PROJECT

CONSULTANTS
2020 L Street, Suite 300
Sacramento, CA 95811
AECOM

ISSUE/REVISION

SHEET NUMBER

SHEET TITLE

PROJECT NUMBER
Designed By:

PROJECT MANAGEMENT INTIALS
Date
Scale:

Checked By:

Approved By:

Drawn By:

Last Plotted:Filename:

Printed on ___% Post-Consumer
Recycled Content Paper
ANSI D 22"x34"
©2018 AECOM Corporation

CRESCENT CITY,

CALIFORNIA
R0 11/02/2023 ISSUED FOR APPROVAL
3/31/26
1" = 4'
3/21/2024 6:06:58 PM
Autodesk Docs://Test-Demo-US-West-Water/60709509_Civil.rvt

CRESCENT CITY SURGE TANK

PROJECT

SITE CROSS SECTIONS
C-3
60709509
SH
MR
11/02/2023
HM
PP
C-3-SITE CROSS SECTIONS
C-1 SCALE: 1" = 4'
1 SITE CROSS SECTIONS 1
C-2 SCALE: 1" = 4'
2 SITE CROSS SECTIONS 2
NOTES

1. PROVIDE MINOR CUT / FILL AND EARTH GRADING FOR SITE DRAINAGE AT SURGE TANK AREA USE TOP SOIL FROM SITE EXCAVATION.

2. FILL TANK WITH WATER FOR A MINIMUM OF 30 CALENDER DAYS TO ALLOW FOR SOIL SETTLEMENT.

INSTALL CONNECTING 10"⌀ ABOVE GROUND PIPE AFTER THIS TIME PERIOD.

P-5
3 NOTE:
1) IF REQUIRED, FILL SPACE UNDER EXISTING CONCRETE SLABS, CAUSED BY SOIL EXCAVATION OF TANK CONCRETE BASE, WITH 3000 PSI CONCRETE (TYPICAL)

I/R DATE DESCRIPTION

DIESEL FUEL TANK

ELECTRICAL TOWER/

CONCRETE PAD

CONCRETE SLAB

CONCRETE PAD

REMOVABLE
SCREEN

STANDBY GENERATOR
ROOM

ELECTRICAL ROOM

0.42'

12.50'

10.00'

9.00'

15.75'

5.90'

17.00'

19.42'

14.58' 5.10' 16.00'

0.65' 29.30'

50.00'

9.00'

50.00'

15.00'

18.12'
N 46° 54' 27" E
S 43° 05' 33" E
S 46° 54' 27" W
N 43° 05' 33" W

45.86'

46.68'

45.32'

45.57'

45.58'

45.50'

45.27' 45.07'

45.71'

46.52' 45.87'

45.88'

46.02'

46.38'

1.00' 2.50'

4.92'

46.44' 46.36'

46.28'
TOP - 36.21'

EXIST FIRE-HYDRANT
EXIST 6" ⌀ GV
EXIST 18" ⌀ GV
EXIST 14" ⌀ GV
10" ⌀
GV
8" ⌀
10" ⌀
14" ⌀

8.0 0'

7.91'

6.00'

6.00'

CONCRETE
THRUST
BLOCK

CONCRETE
THRUST
BLOCK

BUTTERFLY VALVE

FROM RANNEY

COLLECTOR / PUMP

STATION

TO WATER DISTRIBUTION
SYSTEM

FROM RANNEY COLLECTOR /

PUMP STATION
TOP 39.82'

TO WATER DISTRIBUTION
SYSTEM
18" ⌀
14" ⌀

SOUTH BANK ROAD

1.00'
EXIST 18" BFV
6" ⌀
8" ⌀ GV

SURGE TANK PLAN
P-3
2 2 1/2” GV
DOOR

REMOVED AND REPLACE WOOD POLE /

SITE LIGHT AND CONTROL BOX

PG & PT

ELECTRICAL CONDUIT LOCATION
TO LIGHT UNKNOWN SEE NOTE 1.

POT HOLE AND VERIFY

BURIED CONDUIT LOCATIONS
P-8
2 EXIST HOSE BIBB
(SEE NOTE 7)
(SEE NOTE 8)

CONTROL BUILDING
SEE SHEET P-2 FOR 3-D PIPING VIEW

REGISTRATION
CLIENT

CONSULTANT

PROJECT

CONSULTANTS
2020 L Street, Suite 300
Sacramento, CA 95811
AECOM

ISSUE/REVISION

SHEET NUMBER

SHEET TITLE

PROJECT NUMBER
Designed By:

PROJECT MANAGEMENT INTIALS
Date
Scale:

Checked By:

Approved By:

Drawn By:

Last Plotted:Filename:

Printed on ___% Post-Consumer
Recycled Content Paper
ANSI D 22"x34"
©2018 AECOM Corporation

CRESCENT CITY,

CALIFORNIA
R0 11/02/2023 ISSUED FOR APPROVAL
3/31/26
1" = 4'
3/21/2024 6:07:01 PM
Autodesk Docs://Test-Demo-US-West-Water/60709509_Civil.rvt

CRESCENT CITY SURGE TANK

PROJECT

SURGE TANK PIPING PLAN
P-1
60709509
SH
MR
11/02/2023
HM
PP
P-1-SURGE TANK PIPING PLAN
SCALE: 1" = 4'
1 SURGE TANK PIPING DETAILS
N

PIPING NOTES

1. THE LOCATION AND DEPTH OF THE EXISTING BURIED 14-INCH, 18-INCH

DUCTILE IRON PIPELINES AND VALVES ARE SHOWN SCHEMATICALLY ON THE DRAWINGS. THE PIPELINE PLAN/ALIGNMENTS SHOWN WERE
APPROXIMATED USING ORIGINAL PIPE CONSTRUCTION DRAWINGS. THE

CONTRACTOR SHALL POTHOLE/LOCATE ALL BURIED PIPES, VALVES AND

ELECTRICAL CONDUITS IN THE WORK AREA BEFORE ORDERING ANY MATERIALS LOCATE EXISTING FITTINGS AND JOINTS AT TIE-IN AREA.

POTHOLE AT LEAST TWO LOCATIONS (6' LONG) ON EACH WATER

TRANSMISSION PIPELINE TO DETERMINE ALIGNMENT/BEARING AND TO PROVIDE ELEVATION DATA. FOR CITY STAFF TO INSPECT PIPE FOR

AMOUNT OF EXTERIOR CORROSION POTHOLE SURGE TANK AREA FOR

LOCATION AND DEPTH/ELEVATION OF ELECTRICAL CONDUITS AND OTHER PIPES BEFORE BEGINNING SOIL EXCAVATION FOR TANK CONCRETE BASE.

2. THE CONTRACTOR SHALL HIRE A LICENSED SURVEYOR TO RECORD

DEPTH/TOP OF PIPE AND ALIGNMENT OF POTHOLED EXISTING BURIED

PIPES, VALVES AND CONDUITS AND OTHER POSSIBLE OBSTRUCTIONS TO WORK. SURVEYOR TO PROVIDE SURVEY COORDINATES, DEPTH, PIPELINE BEARINGS AND DISTANCES TO PROPOSED SURGE TANK CENTERLINE.

3. USING THE POTHOLE AND SURVEY INFORMATION, THE CONTRACTOR WILL

PROVIDE A DETAILED LAYOUT PLAN OF PROPOSED PIPING FROM
CENTERLINE OF SURGE TANK TO EXISTING PIPE CONNECTIONS. THE PLAN

SHALL PROVIDE PROPOSED COORDINATES AND DIMENSIONS OF SURGE TANK AND PIPING SYSTEM. THIS PIPING LAYOUT PLAN MUST BE REVIEWED

AND APPROVED BY CITY STAFF BEFORE ANY MATERIALS CAN BE
ORDERED.

4. CITY STAFF WILL CLOSE EXISTING VALVES AND DRAIN THE EXISTING

WATER TRANSMISSION PIPELINES FOR THE CONTRACTOR TO CONNECT NEW SURGE SYSTEM PIPING. A MAXIMUM OF 3 CONSECUTIVE DAYS CAN

BE PROVIDED FOR WATER PIPELINE TIE-IN WORK (INSTALLING NEW TEE AND GATE VALVE). CONTRACTOR TO REQUEST TIE-IN DATES AT LEAST 2 WEEKS IN ADVANCE.

5. THE PIPING LAYOUT SHOWN IS BASED ON USING WELDED STEEL PIPE.

THE CONTRACTOR HAS THE OPTIONS OF USING A DUCTILE IRON PIPE (PRESSURE CLASS 53) SYSTEM OR COMBINATION OF BOTH STEEL AND DUCTILE IRON PIPE. THE REQUIRED PIPELINE LAYOUT PLAN SHALL SHOW PIPING MATERIALS. ALL PIPING CONFIGURATIONS MUST RESTRAIN THRUST PRESSURE FORCES.

6. TEST THE NEW PIPELINE SYSTEM AT 175 PSI FOR A MINIMUM FOUR HOUR TIME DURATION. SEE PROJECT SPECIFICATIONS FOR MORE INFORMATION AND REQUIREMENTS.

7. IF REQUIRED PROVIDE A SERVICE SADDLE AND WATER LINE FROM NEW 10

INCH PIPE TO EXISTING HOSE BIBB, POTHOLE AND LOCATE EXISTING PIPE TO H.B

8. IF TRENCH EXCAVATION DAMAGES EXISTING PAVED ROAD, REPAIR PER

CITY STANDARD SPECIFICATION AND MATCH ROAD PAVING CROSS

SECTION / MATERIALS

I/R DATE DESCRIPTION

CONCRETE
THRUST
BLOCK
EXIST 18" Ø BFV
10" Ø GV

EXIST FIRE-HYDRANT

CONCRETE
THRUST
BLOCK
10" Ø
9' Ø SURGE TANK
10" Ø BFV
2 1/2" Ø GV
EXIST 6" Ø
10" Ø
EXIST 18" Ø

BURIED GV
EXIST 14" Ø
BURIED GV EXIST 14" Ø

BURIED PIPE
EXIST 18" Ø

BURIED PIPE
EXIST 14" Ø PIPE
8" Ø GV
8" Ø
EXIST 18" Ø PIPE

PG & PT
P-7
4 P-8
2 10" Ø
10" Ø
EXIST 14" Ø

BURIED GV
8" Ø
EXIST 18" Ø

BURIED GV
EXIST 18" Ø

BURIED PIPE
EXIST 14" Ø PIPE
10" Ø GV
8" Ø GV
EXIST 18"
Ø BFV

CONCRETE
THRUST
BLOCK
9' Ø SURGE TANK
10" Ø BFV

PG & PT
6" Ø
EXIST 6" Ø GV
EXIST FIREHYDRANT

CONCRETE
THRUST
BLOCK
EXIST 14" Ø

BURIED PIPE
2 1/2" Ø GV

CONCRETE
THRUST
BLOCK
EXIST FIREHYDRANT
6" Ø
EXIST 6" Ø GV
10" Ø GV EXIST 18" Ø BFV
10" Ø
10" Ø BFV

PG & PT
10" Ø
8" Ø

CONCRETE
THRUST
BLOCK
EXIST 18" Ø

BURIED PIPE
EXIST 14" Ø

BURIED PIPE
EXIST 14" Ø
PIPE
EXIST 18" Ø PIPE
EXIST 14" Ø

BURIED GV
EXIST 18" Ø

BURIED GV
8" Ø GV
9' Ø SURGE TANK
2 1/2" Ø GV

REGISTRATION
CLIENT

CONSULTANT

PROJECT

CONSULTANTS
2020 L Street, Suite 300
Sacramento, CA 95811
AECOM

ISSUE/REVISION

SHEET NUMBER

SHEET TITLE

PROJECT NUMBER
Designed By:

PROJECT MANAGEMENT INTIALS
Date
Scale:

Checked By:

Approved By:

Drawn By:

Last Plotted:Filename:

Printed on ___% Post-Consumer
Recycled Content Paper
ANSI D 22"x34"
©2018 AECOM Corporation

CRESCENT CITY,

CALIFORNIA
R0 11/02/2023 ISSUED FOR APPROVAL
3/31/26
3/21/2024 6:07:06 PM
Autodesk Docs://Test-Demo-US-West-Water/60709509_Civil.rvt

CRESCENT CITY SURGE TANK

PROJECT
SURGE TANK AND PIPING 3D
VIEWS
P-2
60709509
SH
MR
11/02/2023
HM
PP
P-2-SURGE TANK AND PIPING 3D VIEWS
SCALE:
1 SURGE TANK AND PIPING 3D VIEWS 1
SCALE:
2 SURGE TANK AND PIPING 3D VIEWS 2
SCALE:
3 SURGE TANK AND PIPING 3D VIEWS 3
NOTES:

1. PIPE SLOPE SHALL BE
FLAT ON NEW HORIZONTAL 8 AND 10 INCH PIPES.

SHOW TIE-IN ELEVATIONS ON PIPING PLAN.

I/R DATE DESCRIPTION

2.25' 11.00'

2.00'
24"⌀
ACCESS

MANHOLE

W/ HINGE
TANK

SUPPORT
LEGS

CONCRETE
SQUARE
BASE

PRESSURE
RELIEF
VALVE
AIR
LINE

MAGNETIC
LEVEL

INDICATOR
AIR

RELEASE
VALVE

19.17'
P-4
2 9.00’ Ø
P-5
1 P-5
4 P-5
3 9' Ø SURGE
TANK

1.00'

AGGREGATE

EBASE ROCK
P-5
2 2.08'

SEMI-ELLIPTICAL HEAD
4" PROBE WELL

FOR LEVEL

TRANSMISSION

2.25' 3.67'
1 P-3

13.50'
AIR

RELEASE
VALVE

CONCRETE

SQUARE BASE
24"⌀ ACCESS

MANHOLE W/
HINGER
10"⌀ INLET
& OUTLET
9'⌀

VERTICAL
SURGE
TANK

PRESSURE

RELIEF VALVE

AIR LINE

MAGNETIC LEVEL

INDICATOR
GATE
VALVE

BUTTERFLY
VALVE

13.50'
3 P-3
4 P-3

PG & PT
N° 46 54' 27" E
4" PROBE WELL WITH WATER

LEVEL TRANSMITTER

COORDINATE TANK

ANGLE WITH

PIPING LAYOUT

7.91'

6.00'

8.00'

6.00'

BUTTERFLY
VALVE
13'-6" SQUARE

CONCRET BASE
9'⌀ VERTICAL

SURGE TANK
CENTER
LINE 47.75'
EXIST

GROUND EL

45.00 8" ⌀ OUTLET, MATCH CENTERLINE
ELEVATION OF EXISTING 14" DIP

MATCH CENTERLINE
ELEVATION OF EXISTING 18" DIP

SURGE TANK
P-7 PIPE
4 11.00'
1 10 3 2
2 8 7 6
5 TOC 45.75'

PG & PT
4 10" ⌀
14 9
9 11
2 12
2 13
2 2.02'
4’ 1/2”

REGISTRATION
CLIENT

CONSULTANT

PROJECT

CONSULTANTS
2020 L Street, Suite 300
Sacramento, CA 95811
AECOM

ISSUE/REVISION

SHEET NUMBER

SHEET TITLE

PROJECT NUMBER
Designed By:

PROJECT MANAGEMENT INTIALS
Date
Scale:

Checked By:

Approved By:

Drawn By:

Last Plotted:Filename:

Printed on ___% Post-Consumer
Recycled Content Paper
ANSI D 22"x34"
©2018 AECOM Corporation

CRESCENT CITY,

CALIFORNIA
R0 11/02/2023 ISSUED FOR APPROVAL
3/31/26
As indicated
3/21/2024 6:07:08 PM
Autodesk Docs://Test-Demo-US-West-Water/60709509_Civil.rvt

CRESCENT CITY SURGE TANK

PROJECT

SURGE TANK AND PIPING

DETAILS
P-3
60709509
SH
MR
11/02/2023
HM
PP
P-3-SURGE TANK AND PIPING DETAILS
P-3 SCALE: 1" = 4'
1 SURGE TANK ELEVATION
P-3 SCALE: 1" = 4'
2 SURGE TANK PLAN

PIPING SCHEDULE

ITEM DESCRIPTION
1 10” STEEL, 90 DEGREE ELBOW, FLANGED X GROOVED ENDS
2 GROOVED TYPE COUPLING
3 10-INCH STEEL PIPE SPOOL, GROOVED X FLANGE ENDS
4 10-INCH DISMANTLING JOINT, WITH THRUST RESTRAINT LUGS 5 10-INCH STELL PIPE SPOOL, FLANGED ENDS WITH 2 ½ FLANGED AND ½ INCH WELD-0-LET OUTLETS
6 PRESSURE GAUGE AND PRESSURE TRANSMITTER ASSEMBLY, SEE DETAIL4/P-7
7 10-INCH FLANGED BUTTERFLY VALVE, CLASS 250B, TYPE 220 8 10-INCH STEEL PIPE SPOOL, FLANGED X GROOVED END
9 10-INCH, 90 DEGREE STEEL SHORT RADIUS ELBOW, FLANGE X GROOVED END 10 INSULATING FLANGE, SEE DETAIL 4/P-8
11 10-INCH STEEL PIPE SPOOL, FLANGED X GROOVED END
12 10-INCH X 10-INCH X 8-INCH STEEL TEE, GROOVED X GROOVED X FLANGED ENDS
13 10-INCH STEEL PIPE SPOOL, GROOVED ENDS
14 10-INCH FLANGED COUPLING ADAPTER, WITH THRUST RESTRAINT LUGS 15 2 ½ -INCH FLANGED RESILIENT WEDGE GATE VALVE, WITH NRS, CLASS 250, TYPE 185
16 2 1/2-INCH STEEL PIPE SPOOL WITH FLANGED X FIRE HYDRANT HOSE

CONNECTION & CAP

PIPING NOTES

1. STEEL PIPE SHALL BE SCHEDULE 40, SEE SPECIFICATIONS FOR ADDITIONAL INFORMATION.

2. DUCTILE IRON PIPE SHALL BE CLASS 53, SEE SPECIFICATIONS FOR

ADDITIONAL INFORMATION

3. SEE SPECIFICATIONS FOR PAINTING ABOVEGROUND PIPING SYSTEM

AND COATING/WRAPPING BURIED PIPING SYSTEM, VALVES AND COUPLINGS

4. SEE SHEET P-1 FOR ADDITIONAL PIPING SYSTEM NOTES.

5. CONTRACTOR TO REMOVE POLY WRAP, AND CLEAN EXISTING PIPE EXTERIOR BEFORE INSTALLING SLEEVE TYPE COUPLINGS.

6. AT FLANGED COUPLING ADAPTERS AND STEEL PIPE, REMOVE EPOXY COATING AT LUGS TO PROVIDE MAXIMUM THRUST RESTRAINT.

P-4
4 P-3 SCALE: 1" = 4'
5 14" PIPE TIE-IN DETAIL
P-3 SCALE: 1" = 4'
6 18" PIPE TIE-IN DETAIL

INSULATING
FLANGE

CONCRETE
THRUST
BLOCK
EXIST 14" Ø
PIPE
14" SLEEVE TYPE

COUPLING, MATCH
EXIST/NEW PIPE O.D,
TYP
14" x 14" x 8" FLANGED

REDUCING TEE
8" FLANGED GATE
VALVE
CLASS 250, TYPE 180

TO SURGE
TANK
EXIST 14" ⌀ DIP

FROM RANNEY

COLLECTOR / PUMP

STATION

TO WATER

DISTRIBUTION
SYSTEM

FLANGED COUPLING

ADAPTER / THRUST

RESTRAINT LUGS
THRUST RESTRAINT 90°
ELBOW

DUCTILE IRON

OR STEEL PIPE

INSULATING
FLANGE

CONCRETE

THRUST BLOCK
EXIST 18" Ø PIPE
18" SLEEVE TYPE

COUPLING, MATCH
EXIST/NEW PIPE O.D, TYP
18" x 18" x 10" FLANGED

REDUCING TEE
10" FLANGED GATE VALVE
CLASS 250, TYPE 180
THRUST
RESTRAINT 90°
ELBOW
EXIST 18" ⌀ DIP

FROM RANNEY

COLLECTOR / PUMP

STATION

TO WATER

DISTRIBUTION
SYSTEM

FLANGED COUPLING

ADAPTER / THRUST

RESTRAINT LUGS

TO SURGE
TANK

DUCTILE IRON

OR STEEL PIPE
P-3 SCALE: 1" = 4'
3 TANK INLET-OULET LINE
P-3 SCALE: 1" = 2'
4 2 1/2" VALVE DETAIL
10" ⌀
STEEL
2 1/2" GV
CLASS 250
2 1/2" ⌀
5 16
15 P-4
5 P-8
2 I/R DATE DESCRIPTION
A
D
E
F
9'Ø SURGE TANK
B
C
SHELL (11')

RF CAPACITANCE PROBE LEVEL INDICATOR

BOTTOM OF TANK / REFERENCE POINT

SURGE TANK HEAD
1" SS BALL VALVE, TYP

MAGNETIC LEVEL INDICATOR

PROVIDE LENGTH

REQ'D TO MEASURE ENTIRE

SHELL HEIGHT
SCH 40, SS

PIPE/FITTING

UNION, TYP
3" FLANGED STEEL

TANK OUTLET, TYP
2 1/2" DIA S.S TANK SHELL

MAGNETIC LEVEL

INDICATOR
1" SS BALL VALVE
3" DIA SS BLIND FLANGE
WITH 1" THREADED
OUTLET

INSULATING FLANGE
S.S UNION
3" FLANGED STEEL

TANK OUTLET
SCH 40 SS PIPE
/FITTING

TANK HEAD
MANUAL BYPASS FILL LINE

SS SOLENOID VALVE, TYP

SS SOUND MUFFLER, TYP

SS BALL VALVE, TYP SUPPLY LINE

SS UNION, TYP

TANK FILL/EXHAUST
LINE

AIR FILL
1/2" SA

BOLT CONTROL AND AIR PANEL

ON BUILDING BLOCK WALL PER
MFG STANDARD DETAILS.

USE S.S CONC WEDGE

ANCHORS, SIZE/LOCATION

PROVIDED BY TANK MFC
FROM A.C INSIDE
BLDG

AIR EXHAUST
1/2" SA
P.G (0-200 PSI)
1/2" SS PIPING
SCH. 40 AND UNION
3" DIA SS BLIND
FLANGE WITH 1/2"

THREADED
OUTLET

INSULATING FLANGE
3" DIA STEEL FLANGED OUTLET

TOP OF SURGE TANK HEAD
6" ±

RF CAPACITANCE

PROBE LEVEL

TRANSMITTER
S.S PIPING SIMULAR

TO MAGNETIC

LEVEL INDICATOR
4" SCH
40 S.S PROBE WELL

REGISTRATION
CLIENT

CONSULTANT

PROJECT

CONSULTANTS
2020 L Street, Suite 300
Sacramento, CA 95811
AECOM

ISSUE/REVISION

SHEET NUMBER

SHEET TITLE

PROJECT NUMBER
Designed By:

PROJECT MANAGEMENT INTIALS
Date
Scale:

Checked By:

Approved By:

Drawn By:

Last Plotted:Filename:

Printed on ___% Post-Consumer
Recycled Content Paper
ANSI D 22"x34"
©2018 AECOM Corporation

CRESCENT CITY,

CALIFORNIA
R0 11/02/2023 ISSUED FOR APPROVAL
3/31/26
As indicated
3/21/2024 6:14:04 PM
Autodesk Docs://Test-Demo-US-West-Water/60709509_Process Mechanical.rvt

CRESCENT CITY SURGE TANK

PROJECT
SURGE TANK DETAILS 1 OF 2
P-4
60709509
SH
MR
02/11/2023
HM
PP
P-4-SURGE TANK DETAILS 1 OF 2
SCALE: 1/2" = 1'-0"
3 Surge Tank Control Set Points

HIGH WATER LEVEL ALARM

ADD AIR LEVEL

STOP ADDING AIR LEVEL
(CONTROL SET POINT)

EXHAUST AIR LEVEL

LOW WATER LEVEL ALARM

LOCATION OF MANUAL AIR
RELEASE VALVE (WITH 660

GALLONS OF WATER VOLUME)
A
B
C
E
F
D

PROBE WELL SET POINTS DIMENSIONS
A HIGH WATER LEVEL ALARM 10.6
B ADD AIR LEVEL 10.1
C CONTROL SET POINT (65% FULL

OF WATER)

9.85 D EXHAUST AIR LEVEL 6
E LOW WATER LEVEL ALARM 5.5
F LOCATION OF MANUAL AIR *
PLAN

ELEVATION
NOTES:

1. THE DIMENSIONS SHOWN IN TABLE IS THE DISTANCE (IN FEET)

FROM THE BOTTOM OF THE TANK TO SET POINT

2. LEVEL "C" IS THE OPTIMUM TANK WATER LEVEL/CONTROL POINT IN TANK HEAD (10% OF TOTAL TANK VOLUME)
SCALE: 1 1/2" = 1'-0"
2 MAGNETIC LEVEL INDICATOR DETAIL
SCALE: 1" = 1'-0"
1 AIR CONTROL STATION DETAIL
SCALE: 3" = 1'-0"
4 AIR LINE AT TOP OF TANK DETAIL
4 P-8
SCALE: 1/2" = 1'-0"
5 LEVEL TRANSMITTER
*

I/R DATE DESCRIPTION
1" SS AIR

RELEASE VALVE
1" SS BALL VALVE

SS UNION
3" DIA SS FLANGE WITH
1", THREADED OUTLET
3" DIA FLANGED STEEL

TANK OUTLET
1" DIA SCH 40 SS

PIPE/FITTING

INSULATING FLANGE

TANK SHELL

ELLIPTICAL HEAD

SS PRV, SIZED AND

PROVIDED BY TANK

MANUFACTURER
SS SCH 40 PIPE
3" DIA SS BLIND FLANGE WITH

THREADED OUTLET FOR

PRESSURE RELIEF VALVE

INSULATING FLANGE
3" DIA STEEL

TOP OF SURGE FLANGED OUTLET
TANK
2"
2" CLEAR
3" CLEAR
13' 6'" SQUARE
2' - 1" 1' - 0"
SCARIFY SUBGRADE 6"

AND COMPACT SOIL TO
MINIMUM 90% RELATIVE

DENSITY
FG FG

TOP OF CONCRETE
ELEATION 45.75'
12" AGGREGATE BASE CRUSHED ROCK,
COMPACT TO MINIMUM 95% RELATIVE
DENSITY PER ASTM 1557 TEST METHOD
#7 @ AT 12" O.C
EF,EW
2" CLEAR
1/2" R, TYP
2" CLEAR
FG

WIDE FLANGE TANK

LEG/BASE PLATE

SUPPORT
2 ANCHOR BOLTS PER TANK

LEG SIZE, SIZE PROVIDED BY
TANK MFG.
2' - 0"
3" CLEAR

1.5" NON-SHRINK
GROUT
T.O.C EL 45:75'
#7 AT 12" O.C

REGISTRATION
CLIENT

CONSULTANT

PROJECT

CONSULTANTS
2020 L Street, Suite 300
Sacramento, CA 95811
AECOM

ISSUE/REVISION

SHEET NUMBER

SHEET TITLE

PROJECT NUMBER
Designed By:

PROJECT MANAGEMENT INTIALS
Date
Scale:

Checked By:

Approved By:

Drawn By:

Last Plotted:Filename:

Printed on ___% Post-Consumer
Recycled Content Paper
ANSI D 22"x34"
©2018 AECOM Corporation

CRESCENT CITY,

CALIFORNIA
R0 11/02/2023 ISSUED FOR APPROVAL
3/31/26
As indicated
3/21/2024 6:14:04 PM
Autodesk Docs://Test-Demo-US-West-Water/60709509_Process Mechanical.rvt

CRESCENT CITY SURGE TANK

PROJECT
SURGE TANK DETAILS 2 OF 2
P-5
60709509
SH
MR
02/11/2023
HM
PP
P-5-SURGE TANK DETAILS 2 OF 2
SCALE: 1 1/2" = 1'-0"
1 TANK AIR RELEASE VALVE DETAIL
SCALE: 3" = 1'-0"
2 PRESSURE RELIEF VALVE DETAIL
SCALE: 1' = 1'
3 TANK BASE
SCALE: 1' = 1'
4 TANK LEG ANCHOR BOLT
NOTES:

1. CONCRETE SHALL HAVE A MINIMUM 28 DAY STRENGTH OF 4,000 PSI

2. REINFORCEMENT BARS SHALL BE GRADE 60.

GENERAL NOTES:

TANK ANCHORAGE DESGIN SHALL CONFORM TO ASCE 7-16 SECTION 15.7.5. ANCHORAGE SHALL BE IN ACCORDANCE WITH ASCE 7-16 SECTION 15.4.9, WHEREBY THE ANCHOR EMBEDMENT INTO THE CONCRETE SHALL BE DESIGNED TO DEVELOP THE STEEL STRENGTH OF THE ANCHOR IN TENSION. THE STEEL STRENGTH OF THE ANCHOR IN TENSION SHALL BE DETERMINED IN ACCORDANCE WITH ACI 318-19, EQ.

17.6.1.2. THE ANCHOR SHALL HAVE A MINIMUM GAUGE LENGTH OF EIGHT DIAMETERS. POST INSTALLED ANCHORS ARE PERMITTED TO BE USED IN ACCORDANCE WITH ASCE 7-16 SECTION 15.4.9.3 PROVIDED

THAT THE ANCHOR EMBEDMENT INTO THE CONCRETE IS DESIGNED TO DEVELOP THE STEEL STRENGTH OF THE ANCHOR IN TENSION. IN EITHER CASE, THE LOAD COMBINATIONS INCLUDING OVERSTRENGTH OF ASCE 7-16 SECTION 12.4.3 ARE NOT TO BE USED TO SIZE THE ANCHOR BOLTS.

I/R DATE DESCRIPTION

DIESEL FUEL TANK

ELECTRICAL TOWER/

CONCRETE PAD

CONCRETE SLAB

CONCRETE PAD

REMOVABLE
SCREEN

GENERATOR
SKD

STANDBY GENERATOR
ROOM

ELECTRICAL ROOM

0.42'

12.50'

10.00' 9.00'

12.50'

3.70' 3.25'

15.75'

5.90' 17.00'

19.42'

14.58'

10.40'

5.10' 16.00'

0.65' 29.30'

60.00'

50.00'

9.00'

50.00'

15.00'

18.12'
N 46° 54' 27" E
S 43° 05' 33" E
S 46° 54' 27" W
N 43° 05' 33" W

1.00' 2.50' 4.92'

VERTICAL AIR

COMPRESSOR

OIL WATER

SEPARATOR

DRY WELL
2 C-3

SOUTH BANK ROAD
3 P-6

CORE DRILL

WALL TYP
9' ⌀ SURGE
TANK
1/2" AIR LINE

MOUNT TO WALL
2 P-6

BALL VALVE

BALL VALVE

BALL VALVE
DOOR

WOOD POLE /

SITE LIGHT AND CONTROL
EICA
UNIT
PLC-1 PUMP
1 VFD
PUMP

CONTROL
PANEL
PUMP
2 VFD
PUMP
3 VFD
INC
LINE PMP-3 PMP-2 PMP-1CONTROLS

TRANSFFER
SWITCH

MAIN MCC MCC MCC

AIR CONTROL

PANEL / VALVES

SURGE SYSTEM PLC
P-4
1 1.00' CLR

SWING GATE
UNION

AIR LINE

PIPE SUPPORT

DRAIN WELL

OIL WATER SEPARATOR

VERTICAL AIR

COMPRESSOR

ELECTRICAL ROOM
1/2" ⌀ SS
9' ⌀ SURGE TANK

TANK PIPE

SUPPORT TYP
EG
6 LF OF 10" ⌀ NONREINFORCED

CONCRETE PIPE/ FILL WITH
2" ⌀ DRAIN ROCK

7.50'

AIR CONTROL
PANEL

PIPE SUPPORTS

PER TANK MFG

WALL MOUNTED OIL /

WATER SEPARATOR

VERTICAL AIR

COMPRESSOR
BALL VALVE, TYPE 320
1/2" S.S. CHECK VALVE
UNION
S.S
NIPPLE
S.S BALL
VALVE

DRAIN BALL VALVE
1/2" S.S
1/2" S.S
90 ° ELBOW

WALL PIPE SUPPORT

EXIST FLOOR
S.S

PRESSURE
GAUGE
Ø 24.00

ELECTRIC

DRIVE MOTOR
MOTOR

STARTER
MOTOR

OVERLOAD
RESET
36”
1/2" S.S AIR

LINE BRACE

TO WALL
S.S

CONCRETE

ANCHORS
S.S FLEXIBLE HOSE
S.S HOSE TO

PIPE ADAPTER

DRY WELL
EG

TO AIR CONTROL

PANEL INSIDE

BUILDING
BOLT A.C TO FLOOR
W/S.S CONCRETE

WEDGE ANCHOR

REGISTRATION
CLIENT

CONSULTANT

PROJECT

CONSULTANTS
2020 L Street, Suite 300
Sacramento, CA 95811
AECOM

ISSUE/REVISION

SHEET NUMBER

SHEET TITLE

PROJECT NUMBER
Designed By:

PROJECT MANAGEMENT INTIALS
Date
Scale:

Checked By:

Approved By:

Drawn By:

Last Plotted:Filename:

Printed on ___% Post-Consumer
Recycled Content Paper
ANSI D 22"x34"
©2018 AECOM Corporation

CRESCENT CITY,

CALIFORNIA
R0 11/02/2023 ISSUED FOR APPROVAL
3/31/26
As indicated
3/21/2024 6:07:09 PM
Autodesk Docs://Test-Demo-US-West-Water/60709509_Civil.rvt

CRESCENT CITY SURGE TANK

PROJECT

AIR COMPRESSOR SYSTEM

PLAN AND SECTIONS
P-6
60709509
SH
MR
11/02/2023
HM
PP
P-6-AIR COMPRESSOR SYSTEM PLAN AND SECTIONS
SCALE: 1" = 4'
1 AIR COMPRESSOR SYSTEM PLAN AND SECTIONS
N
P-6 SCALE: 1" = 4'
3 AIR COMPRESSOR PIPING SECTION
AIR COMPRESSOR SYSTEM NOTES:

1. REMOVE EXISTING PLASTIC STORAGE CABINET AND RELOCATE ELECTRICAL WALL SWITCH AND CONDUIT FOR NEW AIR COMPRESSOR SYSTEM. OWNER TO SELECT NEW SWITCH LOCATION INSIDE THE BUILDING.

2. PROVIDE 12-INCHES OF CLEARANCE BETWEEN THE BACK OF THE AIR COMPRESSOR AND MASONRY BLOCK WALL.

3. CORE DRILL THROUGH MASONRY BLOCK WALL FOR ½ INCH STAINLESS STEEL

COMPRESSED AIR LINE TO AIR CONTROL STATION LOCATED OUTDOORS AND ALSO THE CONDENSATE LINE. FILL ANNULAR SPACE WITH FLEXIBLE

WEATHERPROOF SEALANT (PROVIDE A SHOP DRAWING FOR OWNER REVIEW AND APPROVAL OF SEALANT MATERIAL).

4. BOLT THE LEGS OF THE VERTICAL AIR COMPRESSOR TO THE EXISTING CONCRETE FLOOR USING STAINLESS STEEL CONCRETE WEDGE ANCHORS.

AIR COMPRESSOR MFG. TO PROVIDE RECOMMENDED ANCHOR BOLT SIZE AND NUMBER REQUIRED.

5. USE SCHEDULE 40 STAINLESS STEEL PIPING (THREADED AND/OR WELDED JOINTS) FOR ALL COMPRESSED AIR SYSTEM.

6. PROVIDE STAINLESS STEEL PIPE UNIONS AT MAXIMUM 10 FOOT SPACING, BETWEEN EQUIPMENT AND AS SHOWN ON THE PLANS.

7. PROVIDE AIR PIPE SUPPORTS, ATTACHED TO THE BUILDING MASONRY WALLS, AT MAXIMUM 6 FOOT SPACING.

8. ALL VALVES SHALL BE STAINLESS STEEL.

P-6 SCALE: 1" = 2-5'
2 AIR COMPRESSOR

I/R DATE DESCRIPTION

REGISTRATION

CLIENTCRESCENT CITI,CALIFORNIACONSULTANT

PROJECT

CONSULTANTS
2020 L Street, Suite 300
Sacramento, CA 95811
AECOM

ISSUE/REVISION

SHEET NUMBERSHEET TITLE

PROJECT NUMBER
Designed By:

PROJECT MANAGEMENT INTIALS
Date
Scale:Checked By:

Approved By:

Drawn By:

Last Plotted:

Filename:

Printed on ___% Post-ConsumerRecycled Content Paper
ANSI D 22"x34"
©2018 AECOM Corporation
26-Oct-23 10:39:29 PM
https://acc.autodesk.com/docs/files/projects/96cad5c8-801e-4128-bc58-a341dad324be?folderUrn=urn%3Aadsk.wipprod%3Afs.folder%3Aco.fVT3Q455SiCNNn7J7wNhFA&entityId=urn%3Aadsk.wipprod%3Adm.lineage%3AmLe_VS37Tzus5C40_Vtm_A&viewModel=detail&moduleId=folders

AECOM RANNE COLLECTOR

SURGE TANK
MECHANICAL DETAILS 1 OF 2
P-7
60709509
SH
MR
11/02/2023
HMPP
MECHANICAL DETAILS 1 OF 2

I/R DATE DESCRIPTION
As indicated
3/31/26

REGISTRATION

CLIENTCRESCENT CITI,CALIFORNIACONSULTANT

PROJECT

CONSULTANTS
2020 L Street, Suite 300
Sacramento, CA 95811
AECOM

ISSUE/REVISION

SHEET NUMBERSHEET TITLE

PROJECT NUMBER
Designed By:

PROJECT MANAGEMENT INTIALS
Date
Scale:Checked By:

Approved By:

Drawn By:

Last Plotted:

Filename:

Printed on ___% Post-ConsumerRecycled Content Paper
ANSI D 22"x34"
©2018 AECOM Corporation
26-Oct-23 10:39:29 PM
https://acc.autodesk.com/docs/files/projects/96cad5c8-801e-4128-bc58-a341dad324be?folderUrn=urn%3Aadsk.wipprod%3Afs.folder%3Aco.fVT3Q455SiCNNn7J7wNhFA&entityId=urn%3Aadsk.wipprod%3Adm.lineage%3AmLe_VS37Tzus5C40_Vtm_A&viewModel=detail&moduleId=folders

AECOM RANNE COLLECTOR

SURGE TANK
MECHANICAL DETAILS 2 OF 2
P-8
60709509
SH
MR
11/02/2023
HMPP
MECHANICAL DETAILS 2 OF 2

I/R DATE DESCRIPTION
As indicated
3/31/26

EXISTING DIESEL FUEL TANK EXISTING ELECTRICAL TOWER/ CONCRETE PAD STANDBY GENERATOR ROOM ELECTRICAL ROOM SOUTH BANK ROAD 24" ACCESS M.H SURGE TANK P-32 P-45 AIR CONTROL STATION SURGE SYSTEM PLC / CONTROL PANEL MAGNETIC LEVEL INDICATOR P-42 BUTTERFLY VALVE P-41 EXISTING WOOD POLE / SITE LIGHT AND CONTROL LEVEL TRANSMITTER WATER HOSE BIBB EXISTING PLC-1 AIR COMPRESSOR (480V, 3 PHASE, 5HP) EXISTING GENERATOR SKID EICA UNIT EXISTING LIGHTING PANEL EXISTING MOTOR CONTROL CENTER (480V, 3 PHASE) J J J 3/4"C-3#12+1#12 GND 1 3/4"C-2#12+1#12 GND 2 3/4"C-4#14+1#14GND SOLENOID VALVE 1"C-1#18TSP 3 4 PRESSURE TRANSMITTER REGISTRATION CLIENT CONSULTANT PROJECT CONSULTANTS 2020 L Street, Suite 300 Sacramento, CA 95811 AECOM ISSUE/REVISION SHEET NUMBER SHEET TITLE PROJECT NUMBER Designed By: PROJECT MANAGEMENT INTIALS Date Scale: Checked By: Approved By: Drawn By:

Last Plotted:

Filename:

Printed on ___% Post-ConsumerRecycled Content Paper
ANSI D 22"x34"
©2018 AECOM Corporation
CRESCENT CITY, CALIFORNIA R0 11/02/2023 ISSUED FOR APPROVAL 1" = 4' 2/8/2024 8:03:27 PM
Autodesk Docs://Test-Demo-US-West-Water/60709509_Civil.rvt CRESCENT CITY SURGE TANK PROJECT ELECTRICAL BUILDING AND SITE PLAN E-1 60709509 NUAR11/02/2023 HMPP E-1-ELECTRICAL BUILDING AND SITE PLAN SCALE: 1" = 4' 1 ELECTRICAL BUILDING AND SITE PLAN N NOTES: 1) PROVIDE A NEW 20AMP/3POLE CIRCUIT BREAKER IN EXISTING SPACE WITHIN EXISTING MOTOR CONTROL CENTER. 2) PROVIDE A 20AMP/1POLE CIRCUIT BREAKER IN EXISTING SPACE WITHIN EXISTING LIGHTING PANEL. 3) RELOCATE EXISTING LIGHT SWITCH (AT NEW AIR COMPRESSOR LOCATION) AS DIRECTED BY OWNER. IF REQID, CORE DRILL WALL. 4) IF REQUIRED, FOR PIPELINE CONSTRUCTION REMOVE AND REPLACE WOOD POLE AND LIGHT SYSTEM AS DIRECTED BY OWNER. I/R DATE DESCRIPTION C CONDUIT GND GROUND TSP TWISTED SHIELDED PAIR V VOLT ELECTRICAL ABBREVIATIONS 1 SEE NOTE 1 J JUNCTION BOX $ SWITCH CONDUIT EXPOSED CONDUIT IN SLAB OR UNDERGROUND ELECTRICAL LEGEND P-32 CONDUIT BENDS TOWARD OBSERVER CONDUIT BENDS AWAY FROM OBSERVER DETAIL NUMBER DRAWING NUMBER HP HORSEPOWER P POLE PLC PROGRAMMABLE LOGIC CONTROLLER

← All documents from this meeting