Joe Hamilton & Crescent Elk Access
HISP Grant 2023
1'
Lv । ,
...
080
i@awiltoj

A St. & Peterson Park ADA
HISP Grant 2023
fey
Legend
? Peterson Park
M I®'
4 City of Crescent City 2/6/2025
Concrete Pedestrian Improvements - inc. ADA Corners & Sidewalks HISP GRANT -2023
Map # Corner Leng Curb &
Gutter
Depth Face
Curb to Back
of SW
ADA
Corner /
Drop SF
Set Dome Side Panel
Left
Side Panel
Right
SF of Side
Panels 4" S.F 6" S.F C&G SF
Total Conc
Area inc
C&G
4" Cone
CY
6" Cone w
Rebar CY
Curb
Gutter CY
Total
Conc CY
sf of AC
Patchback Notes
1 GSt 11th SE 24 6.5 139 1 4 8.5 75 214 60 274 2.6 0.0 1.3 4.0 48 Corner to grass @ VG 2 GSt 11th VG E 40 4 160 0 160 100 260 0.0 3.0 3.0 400 6" thickness with rebar #3-24" OC, 5' AC each side 3 GSt 11th SW 34 10 323 1 0 323 85 408 4.0 0.0 1.9 5.9 68 6 ESt 10th NW 32 6 139 1 10 38 264 403 80 483 5.0 0.0 1.8 6.8 64 Drop down, will need 1' back curb. Pour top for Drainage inlet
7 ESt 10th SW 34 6 139 1 0 20 110 249 85 334 3.1 0.0 1.9 5.0 68 8 ESt 10th S to 9th W side 6 139 79 434.5 574 0 574 7.1 0.0 0.0 7.1 0 Sidewalk Only Exc Gravel - No Conc Demo 9 DSt 10th NE 21.5 6 118 1 5.5 7 68.75 187 53.75 241 2.3 0.0 1.2 3.5 43 9' Drop down Tie into low point at Driveway Back Curb Conc in estimate total
10 DSt 10th SW 36 6 139 1 10 14 132 271 90 361 3.3 0.0 2.0 5.3 72 Standard walk behind ramp or drop down as
required to clear utility pole, curb conc estimate
in total
11 4th Ast SE 37 6 139 1 6 6 66 205 92.5 298 2.5 0.0 2.1 4.6 74 12 4th Ast NW 56 6 139 1 10 65 412.5 552 140 692 6.8 0.0 3.1 9.9 112 In fill sidewalk North 13 5th A SE 36 6 139 1 10 10 110 249 90 339 3.1 0.0 2.0 5.1 72 15 5th E SW 36 6 139 1 10 10 110 249 90 339 3.1 0.0 2.0 5.1 72 Reset valve box 16 5th E NW 22 10 220 1 8 8 152 372 55 427 4.6 0.0 1.2 5.8 44 Ramp perpendicular with SW corner, reset valve box
TOTALS 408.5 11 3847 160 1021 5028 47.5 3.0 20.5 71 1137 17 Dst west to C 10th S Side 6 111 611 611 0 611 8.8 8.8 Sidewalk only Exc Dirt/roots - no conc demo - 12' back curb
Intersection
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10% Max . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . R/W (Typ) 45° RAMP

DRIVEWAY WIDTH

4.5' 3.0'
W Var 3.0'

4.5'
Var

3.0'
45°
10% Max

DEPRESSEDSIDEWALK
Var
CASE A
Typical driveway, sidewalk not depressed
CASE B
Driveway with depressed sidewalk
PLAN

ELEVATION DRIVEWAYS SECTIONS

ROUNDED

SIDEWALK

SIDEWALK

GUTTER GRADE

ROUNDED

CURB FACE

BOTTOM OF CURB
~
LIP AT BOTTOM OFDRIVEWAY RAMP,1/2" ABOVEGUTTER GRADE
LIP AT BOTTOM OFDRIVEWAY RAMP,1/2" ABOVEGUTTER GRADE

1.5% Max

1.5% Max
~

STRAIGHT
GRADE
T, SEE NOTE 3

SIDEWALK,
SEE NOTE 5
SEE NOTE 5
T, SEE NOTE 3

3.0'
SEE
NOTE 2
1" LIP 6"

4.2'

9.5' COMM SW

7.5% Max

5.5' RES

7.5% Max

TYP TYP

DRIVEWAY
VARIABLE WIDTH ("THROAT")

5.5'

10.0' 4.0'

ADDITIONAL FLARE

COMMERCIAL/ RESIDENTIAL

3.0'

PW STYLE WING UP

5.5'

PROPERTY LINE- R/W PROPERTY LINE- R/W

CALTRANS STYLE WING UP

GUTTER PAN

5.5'
1 2" OR 34" LIP OK

5.5'

12.0'-24.0' RESIDENTIAL

24.0'-30.0' COMMERCIAL

30.0'-40.0' INDUSTRIAL

ACCESSIBLE PATH OF TRAVEL
6"

VARIABLE SLOPE

ADJUST DRIVEWAY
TO MEET 13%

EXISTING STREET SLOPE
+ DRIVEWAY SLOPE SHALL BE
LESS THAN OR EQUAL TO 13%
10"
MAINTAIN 48"

AT CORNERS

TYPICAL
45°

STANDARD WIDTHS

14.5" 20.5"

4.5% MAX 4.5% MAX

5.0' TRANSITION PANEL

IF MATCHING SIDEWALK
GREATER THAN 2%

TYPICAL

1.5% MAX
8% MAX

MATCH EXISTING
ELEVATION AT B.O.W.
= FLOW LINE PLUS 6" MIN
45°
6" THICKNESS WITH REBARPERIMETER OF NEW DRIVEWAY

1.5% MAX
#3 - 24" O.C. E.W.

INTERSECTS AT

BACK OF WALK

TYPICAL

INDUSTRIAL

ADA DRIVEWAY

ADA DRIVEWAY
1 2
12 12

C I V I L
J

ONATHAN OLSON
377 J Street
Crescent City, CA 95531 (707) 464-9506 phone
(707) 465-4405 fax
CITY of CRESCENT CITY

CHECKED BY
DATE
SCALE
JOB NO

DRAWN BYDESIGN BY

PRELIMINARY
NO. REVISION DATE
SHEET

FOR REDUCED PLANS

ORIGINAL SCALE IS IN INCHES
0 1
APRIL 2022
VARIES
8 2022-1043
2022-1043 MEASURE S

CRESCENT CITY, CA

ADA DRIVEWAY DETAIL
JDO
1"=4'
1"=4'
\\Eureka\Projects\2022\022058-CC-HardingAve\Dwgs\022058-MEASURE-S-COLLECT0R-STREEJ.dwg 4/7/2022 10:36 AM

ACCESSIBLE PATH OF TRAVEL

20.5'

PROPERTY LINE- R/W PROPERTY UNE- R/W

10.0’ 4.0’

4.5% MAX 4.5% MAX 10.0
8% MAX 1.5% MAX 5.5’ 5.5’

5.5’ 5.5’

GUTTER PAN ADDITIONAL FLARE PW STYLE WING UP

CALTRANS STYLE WING UP

RESIDENTIAL
OR f LIP OK

DRIVEWAY PERIMETER OF NEW DRIVEWAY

STANDARD WIDTHS NOT TO SCALE

CRESCENT CITY DRIVEWAY STANDARD
4/1/2019

3.0’

LEXISTING STREET SLOPE
+ DRIVEWAY SLOPE SHALL BE
LESS THAN OR EQUAL TO 13%

5.0’ TRANSITION PANEL

IF MATCHING SIDEWALK
GREATER THAN 2%

TYPICAL

INTERSECTS AT

BACK OF WALK

TYPICAL

12.0-24.0’ RESIDENTIAL

24.0-30.0’ COMMERCIAL

30.0-40.0’ INDUSTRIAL
6" THICKNESS WITH REBAR
#3 - 24” O.C. E.W.

COMMERCIAL/

INDUSTRIAL
MAINTAIN 48'

AT CORNERS
TYPICAL 1.5% MAX
ELEVATION AT B.O.W.

FLOW LINE PLUS 6” MIN
VARIABLE WIDTH (’’THROAT”)
VARIABLE SLOPE-i

ADJUST DRIVEWAY
TO MEET 13%

10.0 VAR

3.0 5.5

4.0 2" MIN CLR
6"
#3 REINFORCEMENT BAR
24" O.C. EACH WAY
2" MORTAR BLOCKS SPACED
MAX OF 36" EACH WAY
SEE NOTE 7 BELOW
#3 REINFORCEMENT BAR
20" O.C. IN GUTTER PAN

ACROSS DRIVEWAY
AC
#3 REINFORCING BAR
24" O.C. EACH WAY

IF NOT CONSTRUCTED

MONOLITHIC ADD/ADJUST

REBAR AS NEEDED
2" MIN CLEAR OF ALL

FORMED SIDES & MATERIALS
A
A
PLAN

SECTION A-A

10.0' COMMERCIAL

SIDEWALK SHOWN
NOTES

1. ALL REINFORCING BARS MUST COMPLY WITH ASTM A706/A706M, GRADE 60.

2. YOU MAY SUBSTITUTE WELDED WIRE REINFORCEMENT IN PLACE OF REINFORCING BARS. REINFORCING WIRE MUST COMPLY WITH ASTMA1064/A1064M . SEE SECTION 52 OF THE 2018 CALTRANS STANDARD SPECIFICATIONS.

3. BEFORE CONCRETE IS PLACED, THE REINFORCEMENT TO BE EMBEDDED MUST BE FREE OF MORTAR, OIL, DIRT, EXCESSIVE MILL SCALE AND SCABBY RUST, AND OTHER COATINGS THAT WOULD DESTROY OR REDUCE THE BOND.

4. DO NOT USE BARS WITH KINKS OR IMPROPER BENDS.

5. FIRMLY AND SECURELY HOLD REINFORCEMENT IN POSITION BY WIRING AT INTERSECTIONS AND SPLICES. ALL SPLICES MUST OVER LAP A MINIMUM OF 12 INCHES.

6. USE PRECAST MORTAR BLOCKS OR FERROUS METAL CHAIRS, SPACERS, METAL HANGERS, SUPPORTING WIRES, OR OTHER AUTHORIZED DEVICES OF SUFFICIENT STRENGTH TO RESIST CRUSHING UNDER APPLIED LOADS. DO NOT USE ALUMINUM, PLASTIC, OR WOOD SUPPORTS.

9. REINFORCING BAR MAY BE UP SIZED WITH NO ADJUSTMENT TO SPACING OR LAYOUT.

10. PLACE SUPPORTS AT THE FOLLOWING MINIMUM INTERVALS, #3 BAR @ 36" O.C., #4 BAR @ 48" O.C., #5 BAR @ 60" O.C. MEASURED ALONG OPPOSING ANGLES AND STAGGERING ROWS WHEN POSSIBLE FOR BEST COVERAGE.

11. ALL REINFORCEMENT MUST HAVE A MINIMUM OF 2" OF COVER FROM CONCRETE TO EARTH, BASE ROCK, OR ANY OUTSIDE SURFACE OF CONCRETE.
2" CLEAR
2" CLEAR
City of Crescent City
377 J Street
Crescent City, CA 95531
707-464-9506 phone
707-464-4405 fax DRIVEWAY REINFORCEMENT

REV XXX

REV XXX

REV XXX

APPROVED

CITY ENGINEER

LIP OF GUTTER

FACE OF CURB

BACK OF WALK

SEE STANDARD DRI

STANDARDS FOR CONSTRUCTION
NTS
130-2

STANDARD
City of Crescent City
377 J Street
Crescent City, CA 95531
707-464-9506 phone
707-464-4405 fax CURB DRAIN 150-1

REV XXX

REV XXX

REV XXX

APPROVED

CITY ENGINEER STANDARDS FOR CONSTRUCTION

NOT TO SCALE

STANDARD

WEAKENED PLANE JOINT
#3 REBAR
3" PIPE

FACE OF CURB

FLOWLINES TO MATCH
5-6” (TYPICAL)
3 FACE OF CURB
#3 REBAR
3"x12" STEEL BOX CULVERT
1/4" WALL MIN THICKNESS

SIDEWALK CONSTRUCTED WITH
4" COMPACTED BASE PER

TYPICAL SIDEWALK DETAIL

REBAR TO EXTEND
6“ BEYOND DRAINAGE DEVICE

DRAIN PLACED FLA
T

NO SLOPE
3" PIPE
3"x12” STEEL BOX CULVERT

THE CEMENT CONTENT OF THE CONCRETE SHALL NOT BE
LESS THAN 564 POUNDS PER CUBIC YARD (6 sack mix)

CONSTRUCT WEAKENED PLANE JOINTS AS SHOWN
#3 REBAR
6" BEYOND DRAINAGE DEVICE
#3 REBAR
6” BEYOND DRAINAGE DEVICE
A2-6 CURB AND GUTTER

WEAKENED PLANE JOINT

BOTH SIDES
c” 12
5'-10"

9.0% MAX

AT CURB

PROPERTY LINE
P
R
O
P
E
R
T
Y
LIN
E

7.5% MAX

1.5% MAX

1.5% MAX

7.5% MAX

5.0'

1.5% MAX

1.5% MAX

7.5% MAX
4'-2" MIN
4'-0"

9.0%
MAX
AT
CU
RB

7.5% MAX
RADIUS 10.0'
+/- 1
2 " MAX
10'-0"
C
R
O
S
S
W
A
L
K IF
P
R
O
VID
E
D
5% MAX
AT FL

1.5% MAX

1.5% MAX
6'-0"
10'-0"
6"
5%
MAX
AT
FL
5% MAX
FLARE
24" MIN
A
B
A
B
4'-2"
FLARE

TRANSITION
"W2"
R=1"
R=1"
R=1"
1"
R=1/2"
2"
R=1/2"
"W2" "W2"
R=1"
"W2"
3"
"H1"
"W1"
"H2"
"W1"
"H1"
"H2"
"W1"
"H1"
"H2"
"H1"
"H2"
"W1" "W1"
"W2"
"H2"
"H1"
"W1"
"W2"
"H1"
"H2"
"W1"
"W2"
"H1"
"H2"
ES

FINISHED

ROADWAY

SURFACE

TABLE A
CURB

QUANTITIES
TYPE A1 CURBS
See Table A
TYPE A3 CURBS
Superimposed on existing pavement
See Table A
TYPE A2 CURBS
See Table A
TYPE B1 CURBS
See Table A
TYPE B3 CURBS
Superimposed on existing pavement
See Table A
TYPE B2 CURBS
See Table A
TYPE B4 CURBS
See Table A

TYPE D CURBS TYPE E CURB

TYPE H CURB
On Bridges
CURBS
4:1
6"
6"
R=1/2"
6"
R=1/2"
5"
R=1/2" R=1/2"
8"
5" 2'-0"
6"
R=1/2"
R=1/2"
6"
#4

LONGITUDINAL
BAR #4 DOWEL SPACED 4'-0"
Min LENGTH 8"
5" R=1/2"
#4

LONGITUDINAL
BAR #4 DOWEL SPACED 4'-0"
Min LENGTH 8"
5"
8"
7" 2" 2'-0"
R=1/2"
R=1/2"
9"
6"
2'-9"
R=1/2"
R=1/2"
1'-0"
3"
1'-0"
R=6"
4"
R=1'-0"
2'-0"
6"
"H1"
1'-2"
1'-4"
1'-0"
1'-2"
6"
8"
1'-0"
1'-2"
10"
1'-0"
4"
6"
10"
1'-0"
"H2"
6"
8"
6"
8"
5"
7"
4"
6"
4"
6"
3"
5"
4"
6"
"W1"
71/2"
8"
2'-71/2"
2'-8"
71/4"
73/4"
71/2"
9"
2'-71/2"
2'-9"
7"
81/2"
1'-6"
2'-2"
2'-0"

BRIDGE SIDEWALK

FACE OF CURB
2" OR Var
2" OR Var
2" OR Var
"W2"
11/2"
2"
11/2"
2"
11/4"
13/4"
21/2"
4"
21/2"
4"
2"
31/2"
1'-1"
1'-9"
NOTES:

STATE OF CALIFORNIA

DEPARTMENT OF TRANSPORTATION

0.02585

0.03084

0.05903

0.06379

0.01036

0.01435

0.02185

0.02930

0.05515

0.06171

0.00641

0.01074

0.05709

0.04083

0.06804

0.06661

CUBIC YARDS

PER LINEAR FOOT

CURB DIMENSIONS
TYPE
A1-6
A1-8
A2-6
A2-8
A3-6
A3-8
B1-4
B1-6
B2-4
B2-6
B3-4
B3-6
D-4
D-6
A1-6
A1-8
A2-6
A2-8
A3-6
A3-8
B1-4
B1-6
B2-4
B2-6
B3-4
B3-6
B4
D-4
D-6
E
TYPE

CURBS AND DRIVEWAYS

1.5% Max
SEE NOTE 7
SEE NOTE 7 SEE NOTE 7
Case A driveway section typically applies.

X=3'-0" except for curb heights over 10" where
4:1 slopes shall be used on curb slope.

Sidewalk and ramp thickness "T" at driveway shall
be 4" for residential and 6" for commercial.

Difference in slope of the driveway ramp and the
slope of a line between the gutter and a point on
the roadway 5'-0" from gutter line shall not
exceed 15%. Reduce driveway ramp slope, not
gutter slope, where required.

1. 2.

3. 4.

5. 6.

7. Minimum width of clear passageway for sidewalk
shall be 4'-2".

Retaining curbs and acquisition of construction
easement may be necessary for narrow sidewalks
or curb heights in excess of 6".

Across the pedestrian route at curb ramp locations,
the gutter pan slope shall not exceed 1" of depth
for each 2'-0" of width.
2018 STANDARD PLAN A87A
A87A

SECTION A-A
1:30
4'-2" 5'-0" 10" 24" VARIABLE-48" MAX

1.5% MAX

7.5% MAX
5% MAX

VARIABLE
SLOPE
1"=4'

ADA CURB RAMP

ADA CURB RAMP CROSS SECTION
2 1 CURBS
13 A
13 13

C I V I L
J

ONATHAN OLSON
3 7
7 J
S
tre
e
t
C
re
s
c
e
n
t
City, CA
9 5
5 3
1 (
7 0
7)
4 6
4 -
9 5
0 6
p
h
o
n
e
(
7 0
7)
4 6
5 -
4 4
0 5
fax
C
I
T
Y
o
f
C
R
E
S
C
EN
T
C
I
T
Y

CHECKED BY
DATE
SCALE
JOB NO

DESIGN BY DRAWN BY

PRELIMINARY
N
O. R
E
VISIO
N
D
A
T
E
SHEET
FO
R
RED
U

CED PLA
N
S
O
RIGIN
AL S
C

ALE IS IN IN
C
HES
0 1
APRIL 2022
VARIES
9 2022-1043
2 0
2 2
-
1 0
4 3
M
E
A
S
U
R
E
S
C
R
E
S
C
E
N
T
CIT
Y, C
A
A
D
A
C
U
R
B
R
A
M
P
S
A
N
D
C
U
R
B
S
JDO
NTS
\
\Eureka\Projects\2022\022058-CC-HardingAve\Dwgs\022058-MEASURE-S-COLLECT0R-STREET.dwg 4/7/2022
10:36
AM
GROOVEHNSPECT1ON 1 -

SUB-GRADE
[-INSPECTION 3 - FORM

LAYOUT AW CUT ONLY
iNLESS APPROVED
3THFRW

PANEL CORNERS

BACK OF CURB UNE
DOTH

NSPECTION
NSPECTION 2
NSPECTION 1 -
3" HMA PATCH BACK
' CLASS II AGG BASE
3 - FINAL
- BASE-GRADE

SUB-GRADE
HNSPECTION 2 -

BASE-GRADE
4"—6 SACK CONCRETE W/FlBRE
4“ CLASS II AGv
_ 6-6 SACK CONCRETE W/FIBF
6’ CLASS II AGG
PROJECT TOTAL =

WORK PERIOD
ITEM NO. ITEM DESCRIPTION UNIT Bid QTY. UNIT PRICE TOTAL PRICE 1 Mobilization LS 1 $ 25,000.00 $ 25,000.00
2 Water Pollution Prevention LS 1 $ 10,000.00 $ 10,000.00 3 Traffic Control LS 1 $ 10,000.00 $ 10,000.00
4 Asphalt & Concrete Demolition, Excavation & Prep SF 5028 $ 14.00 $ 70,397.15 5 Asphalt Concrete Patchback SF 1137.0 $ 8.00 $ 9,096.00 6 Concrete Sidewalks & Ramps - 4' Section SF 3847.1 $ 20.00 $ 76,942.35 7 Reinforced Concrete Driveways SF 160.0 $ 28.00 $ 4,480.00 8 ADA Dome Panels - Panels only placed 3'x5' EA 11 $ 600.00 $ 6,600.00 9 Concrete Curb & Gutter LF 408.5 $ 75.00 $ 30,637.50
10 Repair inlet top @ NW 10th & E & place 1' back curb LS 1 $ 6,000.00 $ 6,000.00 11 Thermo 12' stripe @ crosswalks - White LF 432 $ 12.00 $ 5,184.00 12 Thermo 12' stripe @ crosswalks - Yellow LF 150 $ 12.00 $ 1,800.00 $ 256,137.00
ITEM NO. ITEM DESCRIPTION UNIT Bid QTY. UNIT PRICE TOTAL PRICE 13 Sidewalk only from D to C - 112 LF, 5.5' deep plus 1' high back curb SF 611 $ 28.00 $ 17,094.00
$ 17,094.00
Base Bid
Alternative #1 Bid
$ 273,231.00