Cities Index.
Agenda, first session

Crescent City City Council
April 23, 2026

Document
Agenda, first session
Meeting
April 23, 2026
Body
Crescent City City Council
Pages
16
Original file
19.1 MB
Text extracted from the city's file for reading and search. Open the original on www.crescentcity.org. That file is the official record.

1 | P a g e
4/23/26 COUNCIL AGENDA

CITY OF CRESCENT CITY

MAYOR ISAIAH WRIGHT MAYOR PRO TEM CANDACE TINKLER

COUNCIL MEMBER RAY ALTMAN COUNCIL MEMBER JASON GREENOUGH

COUNCIL MEMBER STEVE SHAMBLIN

THURSDAY APRIL 23, 2026 4:30 P.M.

This meeting will be held in person at the location listed above. The City will broadcast the meeting on YouTube, however, if there is a technological issue with YouTube, the meeting will continue in person as scheduled. The public may access and participate in the public meeting by (1) attending the meeting in person and making public comment when called for by the Mayor or (2) by submitting a written comment via [email protected] or by filing it with the City Clerk at 377 J Street, Crescent City, California, 95531. All public comments (via email or mail) must be received by the City Clerk prior to 12:00 p.m. the day of the meeting. Please identify the meeting date and agenda item to which your comment pertains in the subject line. Public comments so received will be forwarded to the City Council and posted on the website next to the agenda. Written public comments will not be read aloud during the meeting.

Notice regarding Americans with Disabilities Act: In compliance with the Americans with Disabilities Act, if you need special assistance to participate in the meeting, please contact the City Clerk’s office at (707)464- 7483, ext. 12. Notification 48 hours before the meeting will enable the City to make reasonable arrangements to ensure accessibility to this meeting [28 CFR 35.102-35.104 ADA Title II]. For TTYDD use for speech and hearing impaired, please dial 711. A full agenda packet may be reviewed at City Hall, 377 J Street, Crescent City, CA or on our website: www.crescentcity.org

OPEN SESSION
Call to order
Roll call
Pledge of Allegiance

NEW BUSINESS

1. Beachfront Park Phase 1B Contract Award
• Recommendation: Hear staff report
• Technical questions from the Council
• Receive public comment
• Further Council discussion
• Approve and authorize City Manager to sign an agreement between the City of Crescent City and Tidewater Contractors for the construction of Beachfront Park Phase 1B.
• Authorize the City Manager to approve and sign change orders in an aggregate amount not to exceed $100,000
• Approve “BEACHFRONT PARK PHASE 1B” Construction documents • Reaffirm staff’s CEQA determination that the project is categorically exempt per CEQA guidelines Class 1 § 15301(a) – Existing Facilities and Class 3 § 15303 - New Construction
AGENDA

SPECIAL MEETING OF THE

CITY COUNCIL OF THE CITY OF CRESCENT CITY

WASTEWATER TREATMENT FACILITY
210 BATTERY STREET
CRESCENT CITY, CA 95531
2 | P a g e
4/23/26 COUNCIL AGENDA

ADJOURNMENT
Adjourn to the regular meeting of the City Council of the City of Crescent City on Monday, May 4, 2026 at 6:00 p.m. at the Flynn Center Board Chambers, 981 H Street, Crescent City, CA 95531.

POSTED:

April 22, 2026
/s/ Robin Altman, City Clerk/Administrative Analyst
Vision:

The City of Crescent City will continue to stand the test of time and promote quality of life and community pride for our residents, businesses and visitors through leadership, diversity, and teamwork.

Mission:

The purpose of our city is to promote a high quality of life, leadership and services to the residents, businesses, and visitors we serve. The City is dedicated to providing the most efficient, innovative and economically sound municipal services building on our diverse history, culture and unique natural resources.

Values:

Accountability - Honesty & Integrity - Excellent Customer Service - Effective & Active Communication -Teamwork – Fiscally Responsible

CITY COUNCIL AGENDA REPORT
TO: MAYOR WRIGHT AND MEMBERS OF THE CITY COUNCIL
FROM: ERIC WIER, CITY MANAGER
BY: DAVID YEAGER, PUBLIC WORKS DIRECTOR

JAMES QUEEN, ENGINEERING PROJECT MANAGER

CLIFF VAN HOOK, ENGINEERING PROJECT MANAGER
DATE: APRIL 23, 2026
SUBJECT: BEACHFRONT PARK PHASE 1B CONTRACT AWARD
______________________________________________________________________

RECOMMENDATION
• Hear staff report
• Technical questions from Council
• Receive public comment
• Further Council discussion
• Approve and authorize City Manager to sign an Agreement between the City of Crescent City and Tidewater Contractors for the construction of Beachfront Park Phase 1B
• Authorize the City Manager to approve and sign change orders in an aggregate amount not to exceed $100,000.
• Approve the plans and specifications for the “Beachfront Park Phase 1B” Project
• Reaffirm staff’s CEQA determination that the project is categorically exempt per CEQA guidelines Class 1 § 15301(a) – Existing Facilities and Class 3 § 15303 – New Construction.

BACKGROUND
The original Beachfront Park Master Plan was developed through a community input process in 2012 and adopted in 2013. Since that time, several projects have been completed within the park as funding was secured, including the Dog Park, improved beach access via a staircase at Stamps Way and an accessible ramp at Howe Drive West, parking area and picnic area at Howe Drive East, as well as improvements to Kidtown, the Fred Endert Municipal Swimming Pool, and the Cultural Center.

On August 16, 2019, the City Council authorized staff to apply for Coastal Conservancy Grant for $90,000 and on October 17, 2019, the Conservancy approved the award of grant funding to the City of Crescent City to update the Beachfront Park Master Plan.

BEACHFRONT PARK PHASE 1B CONTRACT AWARD
April 23, 2026
2 On March 2, 2020, the City Council approved a contract with PGAdesign to complete the updated Beachfront Park Master Plan. City staff worked closely with the PGAdesign team to develop a comprehensive Beachfront Park Master Plan in order to have a competitive Prop. 68 grant application ready by March 12, 2021.

On February 2, 2021, staff presented the final Master Plan to the community with the cost estimates for the entire project. This was in an effort to identify priority projects for the Prop. 68 Statewide Park Development and Community Revitalization Program (SPP) grant application. The City additionally applied for a Prop 68 Rural Recreation and Tourism Program (RRTP) grant. The City was awarded the following Prop 68 grants:
(1) Prop 68 Per Capita: $177,952 to fund the Paths of Culture (now called the Tolowa Cultural Trail) project on the west side of Beachfront Park adjacent to the pool and Tolowa Cultural Interpretive Area.
(2) Statewide Park Development (SPP): $5 million in Statewide Park Development funds for the Bike Park - Pump Track, Tolowa Cultural Interpretive Area with Indigenous Plantings; One Mile Class 1 Trail/Exercise Loop; and a new inclusive playground.
(3) Rural Recreation and Tourism (RRTP): $3 million for the amphitheater and waterfront plaza features.

A Request for Qualifications was published on April 15, 2022 to produce plans and specifications for the Prop 68 funded project. On June 20, 2022, GreenWorks, PC was awarded the contract for the Beachfront Park development and design. On March 20, 2023, the contract was amended to include the design of the amphitheater and waterfront plaza.

On February 27, 2023, GreenWorks presented the General Development Plan (GDP) for the Beachfront Park Area with 60% design constituting plans, specifications, and estimates (PS&E) for Phase 1. The plan was approved by the City Council and Planning Commission on March 4, 2024.

On September 12, 2024, the City published a Request for Bids (RFB) for Beachfront Park Phase 1A. The Phase 1A construction project included earthwork, a portion of the onemile trail/exercise loop trail, ADA ramps, site furnishings (bike rack, benches, and a water fountain), one outdoor fitness station, a sewer line lateral to the future bathroom between the dog park and Marine Mammal Center, and hydroseeding. Bids were opened on September 30, 2024, with the low bidder being Tidewater Contractors.

The bike pump track was constructed in the fall of 2024 by American Ramp Company. A notice of completion for the track was filed in February 2025.

The Phase 1C project is the Front Street Gateway Improvement project which includes work on Front Street, K Street and the areas around the Culture Center including a portion of the Tolowa Cultural Trail recounting the history of the Tolowa people. This contract BEACHFRONT PARK PHASE 1B CONTRACT AWARD
April 23, 2026
3 award was approved by the City Council on August 18, 2025, and should be completed primarily in 2026. Only a small portion of the Tolowa Cultural Trail is funded by Prop 68.

The remainder is funded by other grant sources (Mellon Foundation and Coastal Conservancy Art in Parks).

ITEM ANALYSIS
The Beachfront Park Phase 1B construction project includes the expansion of Kidtown with an all inclusive playground, amphitheater with an elevated stage, two new plaza areas, one of which is to allow for vendor/food truck stalls, expanded pathways for access to the amenities as well as completing the one-mile loop, parking lot expansion, rain gardens and storm drain piping to provide low impact drainage for the improved areas, and new irrigation and landscaping.

The notice inviting bids was published on March 21, 2026. A pre-bid walk occurred on April 3, 2026. On April 17th at 3:00 p.m., the City received three bids, all of which were deemed responsive. The apparent low bidder is Tidewater Contractors.

Bids received:

Engineering Estimate $5,244,905.00
Contractor Bid Amount
Tidewater Contractors $4,999,215.25
JPB Designs $5,392,835.00
ST Rhoades $6,282,195.00
City staff recommend award of the Beachfront Park Phase 1B to Tidewater Contractors.

Construction should begin in June of 2026 with an estimated completion date of October 31, 2027. It is anticipated most of the work will be completed in summer/fall of 2026.

FISCAL ANALYSIS
Some of the Prop 68 funding has been expended on design work and previous contracts.

The grants paid for engineering and design for all Prop 68 scope of work items. Prop 68 was the funding source for the completed Phase 1A, which consisted of the bike pump track, portion of the one-mile exercise loop and trail improvements. Funding has been allocated for a portion of the Tolowa Cultural Trail in Phase 1C already under contract and partially completed. The table below shows the remaining available grant funding for both awards of the received Prop 68 grant. There are sufficient funds available for this construction project.

Grant Awards:

Remaining Prop 68 Funding Current
Balances
Deliverables to be funded by each Prop 68
grant award
Prop 68 RRTP $2,700,685 Amphitheater, Walkways, Waterfront Plaza, Drainage, Utilities, & Landscaping
BEACHFRONT PARK PHASE 1B CONTRACT AWARD
April 23, 2026
4 Prop 68 SPP $2,948,974 Playground, Park, Walkways, Drainage, Utilities, & Parking lot expansion
Available Prop 68 Funding $5,654,056
Phase 1B projected costs including known future change orders (CO) and contingency:

Amount Comment
Tidewater Base Contract $4,999,215 Low bidder of three received bids CO Rain Garden
Irrigation and Plantings $160,000
Work pulled from base bid due to
high plant count, projected high
cost. Projected CO cost based
on received unit pricing for other
planted areas.

CO Concrete base rock
prep
$56,000
Incorrect bid quantity at bid time –
Didn’t match corrected concrete
areas
Project Contingency $438,840 8.8% of base bid
Project Budget $5,654,056
As the available funding covers the projected project costs, staff recommend awarding the Beachfront Park Phase 1B contract to Tidewater Contractors in the amount of $4,999,215.

After the execution of the contract, staff will submit an application to the California State Department Parks and Recreation (the agency providing the grant funds) for advanced funding in the amount of 95% of the contract award ($4,749,254). This advancement of funds will provide the City with cash upfront to pay the contractor as monthly invoices are received for completed work. This creates sufficient cashflow for the project and avoids the need for the City to borrow from outside funding sources for this project.

STRATEGIC PLAN ASSESSMENT
GOAL 1: SUPPORT QUALITY SERVICES, COMMUNITY SAFETY, AND HEALTH TO

ENHANCE THE QUALITY OF LIFE AND EXPERIENCE OF OUR RESIDENTS AND

VISITORS
D. Provide and maintain an efficient, adequate infrastructure to provide for both current and future community needs.

F. Incorporate health considerations into decision-making across departments and policy areas by:
c. Encouraging and supporting community participation in the implementation of the Beachfront Park Master Plan through avenues such as the Beachfront Park Fund.
d. Examining methods to maintain, enhance, and expand park and recreation facilities.

BEACHFRONT PARK PHASE 1B CONTRACT AWARD 5
April 23, 2026

ATTACHMENTS

1. Contract with Tidewater Contractors for Beachfront Park Phase 1B

2. City CEQA Notice of Exemption filed with the County

3. California Coastal Commission Coastal Development Permit

4. Plans and Specifications for Beachfront Park Phase 1B - on website www.crescentcity.org

I 66 I Plantings - Berms - DELETED — . ——— — 1 -----
1 67 Trees - 4’-6' height, B&B 11 EA 925°° i/0j75’y |
i 68 Mulch - Bark to 4” depth 130 CY । /70. laajteS 00 1 | 69 Landscaping Maintenance j 1 LS 1 ^.OOD 00 j
j 70 Play Surface Play Matta - standard pad areas 1 3475 SF Uei^L 71 Play Surface Play Matta - thickened pad fall
zone pad areas
3800 SF 22*350°°
72 Playground Equip - Redwood Tree climber
and ramp
1 LS
739.
73 I Playground Equip - Swing 3 Bay 1 LS 23 Sas02 33 525/; 74 Playground Equip - We-Go-Swing 1 LS 85, 795.
75 Playground Equip - We-Go-Round-Merry-GoRound
1 LS 1^,5^ ^9.5^5,°°
76 Playground Equip - We-Saw-See-Saw 1 LS Pl.5lAn 57 Sb5. 05 77 Playground Equip - Concrete embankment
slide
1 LS oQ
2^5 I 78 Playground Fencing - Perimeter 400 LF 175. 5° 10JOO. 00 1 79 Playground Specialized Fencing -

DELETED
— —
80 Playground Sheterete Boulders 1 EA 500 °° SCO 00
j 81 Picnic Tables 2 EA I.IOO 0? 2 200 °°
| 82 Standard Concrete Benches 9 EA />00 °v IDjDO ° °
83 Furnish and Install removable bollards 5 EA TSO ' 3.750 °° 84 Furnish and Install stage rail 70 LF sil&L M.OOO°U
85 Purchase and install bike racks 5 EA (aOO 00 3,000 0 0 I 86 Drinking Fountain 1 LS /77L500 ./4.7^°L
i s? Feeeieg—Guardrail DELETED 47© LE —
88 Irrigation - Connections and Backflow
Devices
1 LS
/3 2G0”
I 89 Cast-in-place Grated Trench Drains 26 LF 707 0 0
90 Raised curb type 1, pool driveway 345 LF St 50 nil,? 50, 91 Playground Equip - Humpback Whale
Climber
1 LS
- <* 3l; S9D 31590°*
92 Playground Equip - Morphe Dome 1 LS 51 590 ” 57,590 00 93 | Playground Equip - Lighthouse Rock Climber 1 LS 1,7.335” 17,835 94 Playground Equip - Animato Metal Lophone 1 LS /9.430 19 43p *° 95 Playground Equip - Ditty Metal Lophone 1 LS 15. 235 06 96 Playground Equip - Grandioso Chimes 1 LS 23 |7S on <23.175 00 97 Playground Equip - Drums (3) Total 1 LS |^S70” I851d‘° 98 Playground Equip - Mise items not covered
by bid items 70 through 80 and 91 through 97
1 LS
22 800 ”
99 Valley Gutter - reinforced 6" by 4 foot wide 150 LF 8H.50 /3.1*15 00 100 Miscellaneous Concrete Curb, gutters and
ramps at transition areas not included in
pedestrian and vehicular pathways.
1 LS
I
oD jo, pgs JO,01*5 °D
I Total ( Items 1-100) xxxxx XXXXX j xxxxx -1 999J)s.25 BEACHFRONT PARK IMPROVEMENTS PHASE 1B
CONTRACT 2026-1 056.3
00 41 00 - BIDDING SCHEDULE - ADDENDA #4
3 of 4

STATE OF CALIFORNIA - NATURAL RESOURCES AGENCY GAVIN NEWSOM, GOVERNOR

CALIFORNIA COASTAL COMMISSION

NORTH COAST DISTRICT OFFICE
1385 EIGHTH STREET, SUITE 130
ARCATA, CA 95521
VOICE (707) 826-8950
W10a
Filed: 3/18/25
180th Day: 9/14/25
Staff: R. Jacobson-A
Staff Report: 4/24/2025
Hearing Date: 5/7/2025
STAFF REPORT: REGULAR CALENDAR
Application No.: 1-22-0509
Applicant: City of Crescent City
Location: Beachfront Park, Crescent City, Del Norte County (APN 118-020-031)
Project Description: Construction and placement of: (1) Tolowa interpretive trail with interpretive nodes; (2) Tolowa botanical
garden; (3) amphitheater and stage with berms for
seating; (4) waterfront plaza; (5) entryway signage; (6) inclusive play area; (7) Kamome plaza; (8)
jogging/walking loop; (9) two restrooms; (10) parking;
(11) landscaping, planting, and irrigation; (12) signage, lighting, and utilities; and (13) cultural center entryway and gateway structures. The proposed development
also includes tree removal, demolition, construction,
and staging.

Staff Recommendation: Approval with conditions

SUMMARY OF STAFF RECOMMENDATION
The City of Crescent City is proposing to expand and improve public access and recreational opportunities within Beachfront Park, a City-owned 35-acre waterfront park located on the northwest shore of Crescent City harbor. The proposed project will add many recreational facilities and amenities to the park that were designed through a multiyear community engagement process that involved townhall meetings, tabling at community events, meetings with local boards and commissions including native American governing bodies and cultural committees, and stakeholder meetings with various local focus groups.
1-22-0509 (Crescent City Beachfront Park)
2 The Project is located within the ethnographic territory of the Tolowa Native American Tribal Group. As part of the Beachfront Park community engagement process for designing proposed project components, City staff outreached to Tolowa leaders of the local Tolowa tribes. Through an engagement with representatives of the three Tolowa tribes (Tolowa Nation, Tolowa Dee-ni’ Nation, and Elk Valley Rancheria), as well as Tolowa representatives from the Del Norte Historic Society, tribal members directed the design of the Tolowa elements in the park.

The main components of the proposed development include: (1) Tolowa interpretive trail with interpretive nodes; (2) Tolowa botanical garden; (3) amphitheater and stage; (4) waterfront plaza; (5) entryway signage; (6) inclusive play area; (7) Kamome plaza; (8) 1- mile jogging/walking loop; (9) restrooms; (10) parking; (11) landscaping, planting, and irrigation; (12) non-native landscape tree removal; (13) signage, limited lighting, and utilities; and (14) cultural center entryway and gateway structures. The proposed development also includes associated demolition, construction, and staging.

The primary issue raised by the proposed project involves the project’s consistency with the Coastal Act policies regarding protection of water quality. Beachfront Park is situated along Crescent City Harbor, between Elk Creek and the Pacific Ocean.

Approximately six acres of ground disturbance is proposed. Proposed construction activities that require ground disturbance include demolition, grading, trenching and utility placement, and paving. Imported material used for fill includes engineered fill, dredge spoils, concrete, rock, topsoil, and raingarden soil blend.

To protect nearby marine resources, the City proposes a number of erosion and sediment control and pollution prevention measures during project construction including: (a) staging all equipment on the upper terrace of the park on paved, graveled, or ruderal habitat surfaces; (b) installing silt fencing and fiber rolls as perimeter sediment control barriers; (c) stockpiling soils at least 100 feet from Elk Creek wetlands; (d) covering exposed surfaces with straw mulch for soil stabilization; (e) seeding all bare soils with natural turf after the completion of construction; (f) following Best Management Practices (BMPs) for construction vehicle and equipment cleaning, fueling, and maintenance; and (g) preparing a Stormwater Pollution Prevention Plan (SWPPP) due to disturbance of over one acre.

To ensure that the applicant adheres to appropriate construction-related BMPs for dust control and other water quality protection measures, staff recommends Special Condition 3 requiring a suite of BMPs be employed and imposing construction timing requirements limiting earth-moving construction activity to the dry season, and Special Condition 4 requiring submittal of a final SWPPP for the Executive Director’s review and approval prior to commencement of construction.

The proposed project also includes construction of a new accessible and inclusive play area adjacent to the existing playground area. The proposed project design includes the use of soft, poured-in-place (PIP) rubber surfacing (approximately 5,725 square feet (s.f.)) and artificial turf (approximately 1,590 s.f.). The proposed use of artificial turf and PIP synthetic rubber raises several concerns due to their potential adverse impacts to 1-22-0509 (Crescent City Beachfront Park)
3 the environment and biological resources. In general, artificial turf poses significant environmental risks in areas near coastal waters, such as the subject site. Runoff and wind from artificial turf can carry pollutants such as heavy metals, chemicals, and microplastics, which can bioaccumulate and harm terrestrial and marine ecosystems.

Thus, the proposed permeable, synthetic grass must be eliminated from the landscape plan. For these reasons, staff recommends Special Condition 9C prohibiting the use of synthetic/artificial turf/grass, and Special Condition 11 requiring the City to submit Final Revised Playground Plans that include the installation of natural turf – as opposed to artificial turf – at the subject site and addressing any additional site improvements required for the same.

The City has stated that the new playground area design is driven by the need to improve accessibility of the playground for all people, regardless of physical abilities and remove barriers to accessibility that exist in the adjacent playground area where wood chip surface materials are currently used. As such, the City is proposing to use a PIP rubber safety surfacing consisting of a 3/8-inch-thick wearing layer underlain by a variable-thickness cushioning layer (thickness determined by fall height). PIP rubber safety surfacing is typically designed to meet or exceed guidelines set by the Americans with Disabilities Act (ADA) and satisfy the required critical fall height compliance with the American Society for Testing and Materials (ASTM) F1292.

In recent permit actions, the Commission’s water quality specialist has determined that synthetic rubber playground surface materials adversely impact the environment and biological resources, and potentially human health. Thus, the City’s proposed use of PIP synthetic rubber surfacing raises significant concerns due to its potential adverse impacts to the environment and biological resources and cannot be used for playground surfacing. In order to avoid potential adverse impacts to biological resources raised by the use of the proposed synthetic rubber and waste tire playground surfacing materials, staff recommends Special Condition 9 which prohibits the proposed Poured-in-Place rubber playground surface product and similar types of materials; Special Condition 10 which indicates the types of acceptable playground surfacing material(s) to minimize the discharge of hazardous chemicals and microplastic pollution into the environment; Special Condition 11 which requires submittal of Final Playground Plans including acceptable alternative playground surfacing material(s); and Special Condition 12 which requires maintenance of Playground Surfacing Materials.

Staff believes that the proposed development, as conditioned, is consistent with all applicable Chapter 3 policies of the Coastal Act. The Motion to adopt the staff recommendation of approval with conditions is found on Page 5. 1-22-0509 (Crescent City Beachfront Park)
4 TABLE OF CONTENTS
I. MOTION AND RESOLUTION............................................................... 5 II. STANDARD CONDITIONS................................................................... 5 III. SPECIAL CONDITIONS....................................................................... 6 IV. FINDINGS AND DECLARATIONS.....................................................16 A. PROJECT DESCRIPTION ................................................................................... 16 B. ENVIRONMENTAL SETTING ............................................................................... 18 C. STANDARD OF REVIEW .................................................................................... 18 D. OTHER AGENCY APPROVALS............................................................................ 18 E. PUBLIC ACCESS AND RECREATION ................................................................... 19 F. TRIBAL CONSULTATION & PROTECTION OF ARCHAEOLOGICAL RESOURCES ......... 22 G. GEOLOGIC AND FLOOD HAZARDS...................................................................... 24 H. PROTECTION OF COASTAL WATERS.................................................................. 27 I. VISUAL RESOURCES........................................................................................ 32 J. ENVIRONMENTALLY SENSITIVE HABITAT AREAS ................................................. 34 K. CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA)......................................... 38

LIST OF APPENDICES
Appendix A – Substantive File Documents

LIST OF EXHIBITS
Exhibit 1 – Location Maps
Exhibit 2 – Site Plan
Exhibit 3 – Design Plans and Visual Renderings
Exhibit 4 – Project Description
Exhibit 5 – Mitigation Monitoring and Reporting Plan (MMRP) From 2025 IS/MND Exhibit 6 – Public Access Plan
Exhibit 7 – Map of Hybrid and Native Wolf’s Evening Primrose Locations 1-22-0509 (Crescent City Beachfront Park)
5 I. Motion and Resolution
Motion
I move that the Commission approve Coastal Development Permit Application No. 1-22-0509 pursuant to the staff recommendation.

Staff recommends a YES vote on the foregoing motion. Passage of this motion will result in conditional approval of the permit and adoption of the following resolution and findings. The motion passes only by affirmative vote of a majority of the Commissioners present.

Resolution
The Commission hereby approves Coastal Development Permit Application No. 1-22- 0509 for the proposed development and adopts the findings set forth below on grounds that the development as conditioned will be in conformity with the policies of Chapter 3 of the Coastal Act. Approval of the permit complies with the California Environmental Quality Act because either (1) feasible mitigation measures and/or alternatives have been incorporated to substantially lessen any significant adverse effects of the development on the environment, or (2) there are no further feasible mitigation measures or alternatives that would substantially lessen any significant adverse impacts of the development on the environment.

II. Standard Conditions
This permit is granted subject to the following standard conditions:

1. Notice of Receipt and Acknowledgment. The permit is not valid, and development shall not commence, until a copy of the permit, signed by the permittee or authorized agent, acknowledging receipt of the permit and acceptance of the terms and conditions, is returned to the Commission office.

2. Expiration. If development has not commenced, the permit will expire two years from the date on which the Commission voted on the application. Development shall be pursued in a diligent manner and completed in a reasonable period of time. Application for extension of the permit must be made prior to the expiration date.

3. Interpretation. Any questions of intent of interpretation of any condition will be resolved by the Executive Director or the Commission.

4. Assignment. The permit may be assigned to any qualified person, provided assignee files with the Commission an affidavit accepting all terms and conditions of the permit.
1-22-0509 (Crescent City Beachfront Park)
6 5. Terms and Conditions Run with the Land. These terms and conditions shall be perpetual, and it is the intention of the Commission and the permittee to bind all future owners and possessors of the subject property to the terms and conditions.

III. Special Conditions
This permit is granted subject to the following special conditions:

1. Final Plans.

A. PRIOR TO ISSUANCE OF COASTAL DEVELOPMENT PERMIT 1-22-0509, the applicant shall submit to the Executive Director for review and written approval final construction, drainage, and landscaping plans in substantial conformance with those submitted with the application materials on March 18, 2025.

B. The permittee shall undertake development in accordance with the approved final plans. Any proposed changes to the approved final plans shall be reported to the Executive Director. No changes to the approved final plans shall occur without a Commission approved amendment to this CDP unless the Executive Director determines that no amendment is legally required.

2. Future Development Restriction. This permit is only for the development described in Coastal Development Permit Application No. (CDP) 1-22-0509, including, but not limited to: (1) Tolowa interpretive trail with interpretive nodes; (2) Tolowa botanical garden; (3) amphitheater and stage; (4) waterfront plaza; (5) entryway signage; (6) inclusive play area; (7) Kamome plaza; (8) jogging/walking loop; (9) two restrooms; (10) parking; (11) landscaping, planting, and irrigation; (12) tree removal; (13) signage, lighting, and utilities; and (14) cultural center entryway and gateway structures. The following future development restrictions apply:

A. An amendment to CDP 1-22-0509 from the Commission or an additional CDP from the Commission or from the applicable certified local government shall be required for any repair or maintenance identified as requiring a permit in PRC section 30610(d) and Title 14 CCR §13252(a)-(b).

3. Construction Responsibilities. The applicant shall adhere to appropriate construction-related best management practices (BMPs) to protect water quality and surrounding environmentally sensitive habitat areas, including, but not limited to, the following:

A. Except as modified in this permit, all mitigation measures proposed by the permittee shall be implemented, including all mitigation measures included in the final “Mitigation Monitoring and Reporting Program” adopted by the City for the project (Exhibit 5)
1-22-0509 (Crescent City Beachfront Park)
7 B. Timing of Construction Activities.
i. All earth-moving activities shall be conducted during the dry season period of May 15 through November 15; any earth-moving activity conducted between October 16 and November 15 shall be subject to the following conditions:
a) All work shall cease upon the onset of precipitation at the project site and shall not recommence until the predicted chance of rain is less than 50 percent for the Crescent City segment of the National Weather Service’s forecast for
Northwestern California;
b) The work site(s) shall be winterized between work cessation periods by installing stormwater runoff and erosion control barriers around the perimeter of the construction site to prevent the entrainment of sediment into coastal waters; and
c) Adequate stocks of stormwater runoff and erosion control barrier materials shall be kept onsite and made available for immediate use.
ii. All construction activities shall occur during periods of dry weather only. No work shall occur within 72 hours of 50% or greater forecast of rain by the National Weather Service.

C. Minimize Erosion and Sediment Discharge. During construction, erosion and the discharge of sediment off-site or to coastal waters shall be minimized through the use of appropriate Best Management Practices (BMPs), including:
i. Erosion control BMPs (such as mulch, soil binders, geotextile blankets or mats, or temporary seeding) shall be installed as needed to prevent soil from being transported by water or wind. Temporary BMPs shall be implemented to stabilize soil on graded or disturbed areas as soon as feasible during construction, where there is a potential for soil erosion to lead to discharge of sediment off-site or to coastal waters. ii. Sediment control BMPs (such as silt fences, fiber rolls, sediment basins, inlet protection, sand bag barriers, or straw bale barriers) shall be installed as needed to trap and remove eroded sediment from runoff, to prevent sedimentation of coastal waters.

D. Minimize Discharge of Construction Pollutants. The discharge of other pollutants resulting from construction activities (such as chemicals, paints, vehicle fluids, petroleum products, asphalt and cement compounds, debris, 1-22-0509 (Crescent City Beachfront Park)
8 and trash) into runoff or coastal waters shall be minimized through the use of appropriate BMPs, including:
i. Materials management and waste management BMPs (such as stockpile management, spill prevention, and good housekeeping practices) shall be installed or implemented as needed to minimize pollutant discharge and polluted runoff resulting from staging, storage, and disposal of construction chemicals and materials. BMPs shall include, at a minimum:
a) Covering stockpiled construction materials, soil, and other excavated materials to prevent contact with rain, and protecting all stockpiles from stormwater runoff using temporary perimeter barriers.
b) Cleaning up all leaks, drips, and spills immediately; having a written plan for the clean-up of spills and leaks; and maintaining an inventory of products and chemicals used on site.
c) Proper disposal of all wastes; providing trash receptacles on site; and covering open trash receptacles during wet weather. d) Prompt removal of all construction debris from the project area.

E. Minimize Other Impacts of Construction Activities. Other impacts of construction activities shall be minimized through the use of appropriate BMPs, including:
i. The damage or removal of non-invasive vegetation (including trees, native vegetation, and root structures) during construction shall be minimized, to achieve water quality benefits such as transpiration, vegetative interception, pollutant uptake, shading of waterways, and erosion control; and
ii. Soil compaction due to construction activities shall be minimized, to retain the natural stormwater infiltration capacity of the soil. iii. Only wildlife-friendly, 100-percent biodegradable erosion and sediment control products that will not entrap or harm wildlife shall be used. The use of temporary erosion and sediment control products (such as fiber rolls, erosion control blankets, mulch control netting, and silt fences) shall not incorporate synthetic netting (such as plastic, polypropylene, nylon, polyethylene, polyester, or other synthetic fibers), including photo- or biodegradable plastic netting, to prevent wildlife entanglement and plastic debris pollution. Geotextiles, fiber rolls, and other erosion control measures shall be made of loose-weave mesh, such as jute, hemp, coconut (coir) fiber, or other products without welded weaves.

F. Hazardous Materials Management
1-22-0509 (Crescent City Beachfront Park)
9 i. Fuels, lubricants, and solvents shall not be allowed to enter coastal waters.
ii. All equipment used during construction shall be free of oil and fuel leaks at all times.
iii. Staging fueling and equipment maintenance shall occur at least 100 feet away from wetlands, streams, or waterways.
iv. Hazardous materials management equipment including absorbent pads shall be available and immediately on-hand at the project site.

Any accidental spill shall be contained rapidly and cleaned up fully. In the event of a spill, the Permittee shall notify the appropriate regulatory agencies immediately.

4. Final Storm Water Pollution Prevention Plan.

A. NOT LESS THAN THIRTY DAYS PRIOR TO COMMENCEMENT OF
DEVELOPMENT AUTHORIZED BY CDP 1-22-0509, the permittee shall submit to the Executive Director for review and written approval a final Storm Water Pollution Prevention Plan (SWPPP). The final SWPPP shall include, at a minimum, provisions for all of the following:

1. Runoff from the project site shall not increase sedimentation in coastal waters or wetlands post-construction. During construction runoff from the project site shall not increase sedimentation in coastal waters beyond what’s allowable under the final Water Quality Certification approved for the project by the North Coast Regional Water Quality Control Board;

2. Runoff from the project site shall not result in other pollutants entering coastal waters or wetlands during construction or post-construction;

3. Best Management Practices (BMPs) shall be used to prevent the entry of polluted stormwater runoff into coastal waters and wetlands during construction and post-construction, including use of relevant BMPs as detailed in the current California Storm Water Quality Best Management Handbooks (http://www.cabmphandbooks.com);

4. An on-site spill prevention and control response program, consisting of best management practices (BMPs) for the storage of clean-up materials, training, designation of responsible individuals, and reporting protocols to the appropriate public and emergency services agencies in the event of a spill, shall be implemented at the project to capture and clean-up any accidental releases of oil, grease, fuels, lubricants, or other hazardous materials from entering coastal waters or wetlands;
1-22-0509 (Crescent City Beachfront Park)
10 5. Equipment operators shall be trained in the procedures to be taken should an accidental spill occur. Absorbent materials designed for spill containment and cleanup shall be kept onsite during construction for use in the event of an accidental spill;

6. A schedule for installation and maintenance of appropriate construction source-control BMPs to prevent entry of stormwater runoff into the construction site and the entrainment of excavated materials into runoff leaving the construction site; and

7. The SWPPP shall be prepared and implemented consistent with the provisions of all other terms and conditions of Coastal Development Permit 1-22-0509.

B. The permittee shall undertake development in accordance with the approved final storm water pollution prevention plans. Any proposed changes to the approved final plans shall be reported to the Executive Director. No changes to the approved final plans shall occur without a Commission amendment to this coastal development permit, unless the Executive Director determines that no amendment is legally required.

5. Protection of Archaeological Resources. The landowner/permittee shall undertake development in compliance with the following mitigation measures to protect archaeological and/or tribal cultural resources:

A. If an area of tribal cultural and/or archaeological resources is discovered during ground-disturbing activities, all construction shall cease and shall not recommence except as provided in subsection (C) hereof, and the permittee shall retain a qualified archaeologist and/or tribal cultural resource specialist to analyze the significance of the find in consultation with the Native American Tribes listed on the NAHC list. The archaeologist and/or tribal cultural resource specialist shall immediately notify the Tribes on the NAHC list. An “exclusion zone” where unauthorized equipment and personnel are not permitted shall be established (e.g., taped off) around the discovery area that includes a reasonable buffer zone recommended by the monitor(s). Project activities may continue outside of the exclusion zone.

B. Should human remains be discovered on-site during the course of the project, immediately after such discovery, the on-site archaeologist and/or tribal cultural resource specialist shall notify the county coroner within 24 hours of such discovery, and all construction activities shall be temporarily halted until the remains can be identified. An “exclusion zone” may be established around the discovery area. Project activities may continue outside of the exclusion zone. If the county coroner determines that the human remains are those of a Native American, the coroner shall contact the NAHC within 24 hours, pursuant to Health and Safety Code Section 7050.5. The NAHC shall deem the Native American most likely descendant (MLD) to be invited to participate 1-22-0509 (Crescent City Beachfront Park)
11 in the identification process pursuant to Public Resources Code Section 5097.98. The landowner/permittee shall comply with the requirements of Section 5097.98 and work with the MLD person(s) to preserve the remains in place, move the remains elsewhere onsite, relinquish the remains to the descendants for treatment, or determine other culturally appropriate treatment. Within five (5) calendar days of notification to NAHC, the permittee/ landowner shall notify the Coastal Commission’s Executive Director of the discovery of human remains and identify any changes to the proposed development or mitigation measures that may be needed related to the inadvertent discovery. The Executive Director shall maintain confidentiality regarding the presence of human remains on the project site. The Executive Director shall determine whether the identified changes are de minimis in nature and scope.

C. A permittee seeking to recommence construction within an exclusion zone following discovery of tribal cultural and/or archaeological resources shall submit a Supplementary Archaeological Plan (SAP) prepared by an archaeologist in consultation with the Native American Tribes listed on the NAHC list for the review and written approval of the Executive Director. If the Executive Director approves the SAP and determines that the SAP’s recommended changes to the proposed development or mitigation measures are de minimis in nature and scope, construction may recommence after this determination is made by the Executive Director in writing. If the Executive Director approves the SAP but determines that the changes therein are not de minimis, construction may not recommence until after an amendment to this permit is approved by the Commission.

6. Landscaping Restrictions. Only native and/or non-invasive plant species shall be planted as landscaping on the property. No plant species listed as problematic and/or invasive by the California Native Plant Society, the California Invasive Plant Council, or as may be identified from time to time by the State of California, shall be employed or allowed to naturalize or persist on the site. No plant species listed as a “noxious weed” by the governments of the State of California or the United States shall be utilized within the bounds of the property.

7. North Coast Regional Water Quality Control Board Approval. PRIOR TO COMMENCEMENT OF PROJECT ACTIVITIES, the Permittee shall provide to the Executive Director a copy of a permit issued by the Regional Board, a letter of permission, waiver of discharge requirements, or evidence that no permit or permission is required. The Permittee shall inform the Executive Director of any changes to the project required by the Regional Board. Such changes shall not be incorporated into the project until the applicant obtains a Commission amendment to this coastal development permit, unless the Executive Director determines that no amendment is legally required.
1-22-0509 (Crescent City Beachfront Park)
12 8. Encroachment Permit and Agreement. Prior to commencement of construction of the encroachments onto the public rights of way described herein, the permittee shall submit, for the review and approval of the Executive Director, a copy of a valid, approved Encroachment Permit and signed Agreement from Caltrans authorizing the development approved by this coastal development permit which would encroach onto the public right-of-way, or evidence demonstrating that no encroachment permit is required. The permittee shall comply with the provisions of the approved Encroachment Permit and Agreement. The Permittee shall inform the Executive Director of any changes to the project required by Caltrans. Such changes shall not be incorporated into the project until the Permittee obtains a Commission amendment to this coastal development permit, unless the Executive Director determines that no amendment is legally required.

9. Prohibited Playground and Turf Surfacing Materials.

A. Playground Surfacing Materials Made from Waste Tires. Playground surfacing products made from shredded or granulated waste vehicle tires shall be prohibited, including any poured-in-place (PIP) rubber playground surfacing product. Shredded waste tire material such as that used in the cushioning base layer in PIP rubber playground surfacing is typically labeled in product descriptions as rubber, recycled rubber, or recycled SBR (styrene-butadiene rubber). Synthetic rubber playground mats, pads, and tiles made from granules of waste tires held together with chemical binders are typically labeled as rubber or recycled rubber products. Granules of waste tires used as infill for synthetic grass are typically called “crumb rubber.”
Prohibited types of playground surfaces made from waste tire materials shall include, but are not limited to, PIP rubber playground surfacing products made from shredded tires; loose-fill shreds or pieces of tires (i.e., “rubber mulch”); shredded tires held together with a resin binder (i.e., “bonded rubber mulch”); synthetic rubber mats, pads, and tiles manufactured from tire rubber; and synthetic grass (i.e., artificial turf) with tire crumb rubber infill.

B. Playground Surfacing Materials Made from Synthetic Rubber Granules.

Synthetic rubber granules commonly used in the top layer of PIP rubber surfacing products, including ethylene propylene diene monomer (EPDM), thermoplastic vulcanizate (TPV), and thermoplastic elastomer (TPE), shall be prohibited for use in playground surfacing products. EPDM may be labeled as “virgin rubber” if it is not derived from recycled materials; however, this is a synthetic rubber, not natural rubber.

C. Synthetic Turf/Grass. No synthetic turf/grass is permitted.

10.Acceptable Playground Surfacing Materials. Acceptable playground surfacing materials to minimize the discharge of hazardous chemicals and microplastic debris shall include, but are not limited to, the following:
1-22-0509 (Crescent City Beachfront Park)
13 A. Natural Materials. Natural materials such as engineered wood fiber (EWF); cork PIP surfacing; loose-fill materials such as sand, pea gravel, wood chips, bark, or pieces of natural rubber; and mats, pads, or tiles made from natural rubber (not waste tire rubber) shall be the preferable choice for playground surfacing materials, where feasible. Mats, pads, or tiles that do not contain waste tire material may be installed on top of EWF or loose-fill playground materials to create wheelchair-accessible pathways to playground equipment, and/or to prevent displacement of loose-fill materials in high-use areas such as under swings. EWF with a resin binder (“bonded EWF”) may also be used to create wheelchair-accessible pathways in the playground. Though the materials described in this section are preferable, the materials discussed in Section B. below may be used instead in the circumstances described therein.

B. Low-Toxicity Non-granular Plastics. Playground surfacing products made from types of plastics that have documented low toxicity to humans and the environment shall be acceptable if use of natural surfacing materials is not feasible. Any plastic products used for the top surface of the playground shall contain only non-granular plastics, not resin-bonded granules, to minimize microplastic pollution. Acceptable low-toxicity non-granular plastic playground surfacing products shall include, but are not limited to:
i. Woven or non-woven roll-out polyester beach access mats that provide wheelchair-accessible pathways across sand.
ii. Injection-molded polyvinyl chloride (PVC) interlocking perforated tiles that integrate with loose-fill surfacing materials to provide wheelchairaccessible pathways and/or to prevent displacement of loose-fill surfacing materials under high-use playground equipment (such as swings and slides). These tiles may also be used throughout the playground when installed on top of a cushioning pad. The cushioning pad beneath these tiles shall not contain waste tire material.
iii. Cross-linked polyethylene foam (XPE) shock pads may be used as a cushioning material, such as under injection-molded interlocking perforated PVC tiles, to provide fall protection under playground equipment or throughout the playground.

11.Final Playground Plans. Prior to commencement of playground construction, the Permittee shall submit, for the review and approval of the Executive Director, final plans for the construction and maintenance of the playground using an acceptable alternative playground surfacing material as specified in Special Condition 10. The plans shall demonstrate the following:

A. Synthetic turf shall be eliminated, and shall be replaced by a more environmentally friendly alternative (e.g., organic bark, decomposed granite, native (to the project area) drought-tolerant non-invasive grass, 1-22-0509 (Crescent City Beachfront Park)
14 etc.). If grass or other landscaping is selected, the use of synthetic fertilizers on such area shall be prohibited.

B. The final playground plans shall be prepared by a qualified engineer and/or other qualified professional and shall include technical analyses addressing drainage, grading, and irrigation required for the proposed development. The plan shall include a description of best management practices (BMPs) to be employed during playground construction activities.

C. No elements of Pour-in-place synthetic rubber or artificial turf shall be included in the Final Revised Playground Plans. Pour-in-place synthetic rubber shall be eliminated and shall be replaced with an acceptable alternative material as specified in Special Condition 10.

12.Maintenance of Playground Surfacing Materials. Any synthetic playground surfacing materials shall be frequently inspected, and promptly repaired or replaced if the material becomes damaged or deteriorated, to minimize the discharge of microplastic debris into the environment. Playground surfaces that contain synthetic surfacing materials shall be inspected before and after powerwashing, and any dislodged microplastic pieces shall be promptly collected for proper disposal. Microplastic pieces dislodged from playground surfacing materials shall not be washed or swept off the playground surface into adjacent areas, and instead shall be promptly collected for proper disposal.

13. Revised Final Lighting Plans.

A. WITHIN SIX MONTHS OF ISSUANCE OF CDP 1-22-0509, and not less than 30 days prior to installation or retrofit of any lighting facilities, the applicant shall submit to the Executive Director for review and written approval one full size set of revised lighting plans that demonstrate the following:
i. Maximum color temperature of lighting fixtures shall contain a maximum color temperature of 2,700 degrees Kelvin (K), unless it can be demonstrated that such features would not meet required safety measures. In no case shall lighting exceed a correlated color temperature of 3,000 K.
ii. All lighting fixtures shall be the minimum lumens required for safety and security. No non-security or non-safety lighting and no lighting for aesthetic purposes is allowed.
iii. Security lighting attached to the structures shall use a control device or automatic switch system or equivalent functions to minimize lighting.
iv. All lighting fixtures shall be shielded and directed downward to minimize light shining on adjacent properties or natural areas.

Shielded shall mean that the light rays are directed onto the site, 1-22-0509 (Crescent City Beachfront Park)
15 and the light source (e.g., bulb, tube, etc.) is not visible beyond the property boundary of the site of the light source.
v. No permanently installed lighting shall blink, flash, or be of unusually high intensity or brightness.
vi. Stand‐alone light fixtures shall be limited to a maximum height of 20 feet.
vii. No lighting shall produce an illumination level greater than one‐foot candle (10.76 lumens) beyond the property boundary of the site of the light source.

B. The permittee shall undertake development in accordance with the approved final plans. Any proposed changes to the approved final plans shall be reported to the Executive Director. No changes to the approved final plans shall occur without a Commission amendment to this coastal development permit, unless the Executive Director determines that no amendment is legally required.

14. Protection of Sensitive Bird Nesting Habitat
A. NOT MORE THAN 72 HOURS PRIOR TO COMMENCEMENT OF
DEVELOPMENT that involves vegetation removal activities, including ground disturbance for trenching work, during the bird nesting season (March 1 to August 15), a qualified biologist shall survey for active bird nests in and adjacent to the construction area according to current CDFW recommended survey protocol(s). The minimum survey area shall include the trees and other vegetation within the development footprint and a minimum 500-foot buffer area around the development footprint. Surveys shall be repeated any time development activities have ceased for more than 72 hours unless the work is occurring outside of the nesting season.

B. If any active bird nests for raptors or special status bird species are detected, development (including major vegetation removal) in the buffer zone shall be delayed until after the young have fledged, as determined by additional surveys conducted by a qualified biologist. Buffers shall be 500 feet for nesting raptors and 300 feet for other nesting bird species.

C. The Permittee shall submit to the Executive Director the results of the surveys required in subpart A above prior to commencement of development, including a narrative that describes the survey details (e.g., dates, methods, personnel and their qualifications), results, measures proposed to avoid disturbance of nesting birds, and a map that depicts the location(s) of any active nests identified and the associated buffer zones.

15.Assumption of Risk, Waiver of Liability, and Indemnity Agreement. By acceptance of this permit, the permittee acknowledges and agrees (a) that the 1-22-0509 (Crescent City Beachfront Park)
16 site may be subject to hazards from earth movement, earthquake shaking, liquefaction, differential settlement, erosion, flooding, and other geologic and flood hazards, some of which will worsen with future sea level rise; (b) to assume the risks to the permittee and the property that is the subject of this permit of injury and damage from such hazards in connection with this permitted development; (c) to unconditionally waive any claim of damage or liability against the Commission, its officers, agents, and employees for injury or damage from such hazards; and (d) to indemnify and hold harmless the Commission, its officers, agents, and employees with respect to the Commission’s approval of the project against any and all liability, claims, demands, damages, costs (including costs and fees incurred in defense of such claims), expenses, and amounts paid in settlement arising from any injury or damage due to such hazards.

16.Limitations on Use of Amphitheater Cover. As proposed by the Permittee, the amphitheater stage cover will be retractable and shall be locked in the closed position when not in use, and shall only be raised during events.

IV. Findings and Declarations
The Commission hereby finds and declares as follows:

A. Project Description
The project site is located within the City of Crescent City, Del Norte County. The City of Crescent City proposes to further develop Beachfront Park, an approximately 35-acre, City-owned waterfront park on the northwest shore of Crescent City Harbor (Exhibits 1- 3). The park is bounded by Front Street on the north, Elk Creek on the east, Crescent City Harbor on the south, and B Street on the west. The project is located at 391 Front Street, Assessor Parcel Number (APN): 118-020-031-000.

The proposed development will implement some elements of the City’s Beachfront Park General Development Plan. The Beachfront Park General Development Plan incorporates visioning and feedback from a multiyear community engagement process that involved townhall meetings, tabling at community events, meetings with local boards and commissions including native American governing bodies and cultural committees, and stakeholder meetings with various local focus groups1. Feedback gathered through in-person events, via Zoom, Facebook, YouTube, and other venues was organized into three themes (culture, nature, and recreation) with recreational features and elements that represent a range of community interests and priorities. 1 Populations reached through focus groups included: Youth aged 14-18; Senior population; Individuals with physical disabilities; Adults with developmental disabilities; Seniors with developmental disabilities; Caregivers; Childcare workers; Low-income families with children ranging from infants to teenagers; Tolowa Dee-Ni’ Cultural Committee; and Hispanic/Latino populations 1-22-0509 (Crescent City Beachfront Park)
17 The main components of the proposed development include: (1) Tolowa interpretive trail with interpretive nodes; (2) Tolowa botanical garden; (3) amphitheater and stage; (4) waterfront plaza; (5) entryway signage; (6) inclusive play area; (7) Kamome plaza; (8) 1- mile jogging/walking loop; (9) restrooms; (10) parking; (11) landscaping, planting, and irrigation; (12) tree removal; (13) signage, lighting, and utilities; and (14) cultural center entryway and gateway structures. The proposed development also includes associated demolition, construction, and staging.

The Tolowa interpretive trail component will involve redeveloping 1,200 linear feet of the California Coastal Trail, along the eastern edge of Beachfront Park and Elk Creek, as a multiuse trail designed to honor the Tolowa people. Three interpretive nodes will be constructed along the path, including a sculptural redwood tree, burden basket, and canoe (Exhibit 3). Interactive placards (QR codes) at each node will explain the cultural significance of each feature to the Tolowa people.

The Tolowa botanical garden will be installed within the northeast portion of the park adjacent to the Del Norte County Visitor/Cultural Center. The garden areas will be planted with native plant forbs, grasses, and shrubs that the Tolowa people traditionally use for medicinal, nutritional, and ceremonial purposes. Native trees will also be planted. Concrete walking paths throughout the garden areas will connect with the interpretive trail.

The approximately 28,000-square-foot waterfront plaza includes a grass sitting area with terraced walls (“seatwalls”), farmers market area, and food truck area to accommodate five food trucks. This plaza will be developed along the waterfront, east of the intersection of Stamps Way and Howe Drive.

Entryway signage will be installed on concrete walls (maximum height of five feet) along the park entrance at Stamps Way (at the intersection of Front Street and H Street), including at the southeast and southwest corners of Stamps Way and Front Street.

Additionally, gateway features with approximately five-foot-tall planted berms and two 15-20-foot-tall steel sculptural wave designs will be installed between L and M Streets, and one just west of L Street. Other wayfinding signs will be installed in these areas to direct park visitors.

The inclusive play area will be constructed adjacent to the existing playground area.

Play equipment, a water play area, soft ground surfacing, and concrete paving will be installed. The play area will have a four-foot-tall chain-link fence around the perimeter. A new, 1,610-square-foot plaza will be developed adjacent to the play area and will feature a replica of the boat that washed up in Crescent City following the 2011 earthquake in Japan and associated tsunami that reached Crescent City. The boat will bear the name “Kamome” (meaning “seagull” in Japanese).

Two restroom buildings with four stalls each are proposed. The buildings are approximately 12 feet tall, with a total footprint of approximately 350 square feet each. 1-22-0509 (Crescent City Beachfront Park)
18 One of the buildings will be in the playground area, and one will be near the existing pump track. Additional project components are described in Finding IV.I (“Visual Resources”) below.

B. Environmental Setting
The 35-acre Beachfront Park is located approximately four miles southwest of the junction of Highway 101 and Highway 199 in Del Norte County and is situated along Crescent City Harbor, between Elk Creek and the Pacific Ocean. Historically, the project site was located approximately 800 feet out in the Crescent City Harbor. In 1964, the Great Alaska Earthquake set in motion a tsunami down the west coast of the U.S. that decimated the Crescent City Harbor and approximately 30 city blocks. After the tsunami, the U.S. Army Corps of Engineers dredged the harbor and placed the spoils along the coastline to create present day Beachfront Park. Approximately ten feet of concrete rubble and debris was first placed in the area, then approximately 18 inches of sandy fill was placed over the rubble, creating the present-day park surface. Large concrete chunks and rock revetment were also placed on the shoreline between the ocean and park to provide armoring along the beach and the Elk Creek Estuary.

The relatively flat and grassy expanse of Beachfront Park is currently used for open space and recreation. It is currently developed with several facilities and amenities including but not limited to: a visitor/cultural center, restrooms, an indoor swimming pool facility, marine mammal rescue center, playground, picnic areas, disc golf course, bicycle pump track, dog park, parking lots, various monuments, soccer fields, gazebo, and a number of open lawns. Battery Point Lighthouse is located ¼ mile southwest of Beachfront Park. A multimodal section of the California Coastal Trail also runs along the waterfront of the park, connecting the park with Battery Point Park and B Street pier to the west and the City-owned RV park and Crescent City Harbor to the east.

Surrounding developments north of the park include a brewery/restaurant, various commercial businesses, and residential apartments along Front Street. Other nearby developments include the Crescent City Wastewater Treatment Facility west of the park.

C. Standard of Review
The City of Crescent City has a certified Local Coastal Program (LCP). However, the project site is located entirely in the Commission’s retained permit jurisdiction because it is located on filled tidelands and within an area shown on State Lands Commission maps over which the state retains a public trust interest. Therefore, as required by Public Resources Code section 30519(b) and 14 CCR section 13166(c), the standard of review that the Commission must apply to the project is the Chapter 3 policies of the Coastal Act.

D. Other Agency Approvals
The proposed project requires the applicant submit a Notice of Intent to be covered by a National Pollution Discharge Elimination System (NPDES) permit to the State Water 1-22-0509 (Crescent City Beachfront Park)
19 Resources Control Board, and must prepare a Stormwater Pollution Prevention Plan (SWPPP) prior to commencement of construction. The beneficial reuse of dredge spoils requires a conditional waiver of waste discharge requirements under the North Coast Regional Water Quality Control Board (NCRWQCB) Order No. R1-2017-0039, demonstrating that the fill is low threat and is appropriate for beneficial reuse. A small portion of the project involving the placement of temporary detour signage, and installation of wayfinding signage between M and N Streets, may require an encroachment permit from Caltrans.

To ensure that the Permittee obtains all necessary agency approvals, and that these approvals are consistent with the project authorized herein, the Commission attaches Special Conditions 7 and 8, which require the Permittee to submit to the Executive Director evidence of these agency approvals of the project prior to the commencement of construction activities and, in the case of Caltrans, prior to commencement of any encroachments within the public rights-of-way. The condition requires that any project changes resulting from any other agency approval not be incorporated into the project until the permittee obtains any necessary amendment to this CDP.

E. Public Access and Recreation
Coastal Act section 30210 states:

In carrying out the requirement of Section 4 of Article X of the California Constitution, maximum access, which shall be conspicuously posted, and recreational opportunities shall be provided for all the people consistent with public safety needs and the need to protect public rights, rights of private property owners, and natural resource areas from overuse.

Coastal Act section 30211 states:

Development shall not interfere with the public’s right of access to the sea where acquired through use or legislative authorization, including, but not limited to, the use of dry sand and rocky coastal beaches to the first line of terrestrial vegetation.

Coastal Act section 30212(a) states, in part:

Public access from the nearest public roadway to the shoreline and along the coast shall be provided in new development projects except where: (1) it is inconsistent with public safety, military security needs, or the protection of fragile coastal resources, (2) adequate access exists nearby, or, (3) agriculture would be adversely affected.

Coastal Act section 30213 states, in part:

Lower cost visitor and recreational facilities shall be protected, encouraged, and, where feasible, provided. Developments providing public recreational opportunities are preferred.
1-22-0509 (Crescent City Beachfront Park)
20 Coastal Act section 30214 states in part:
(a) The public access policies of this article shall be implemented in a manner that takes into account the need to regulate the time, place, and manner of public access depending on the facts and circumstances in each case including, but not limited to, the following:
(1) Topographic and geologic site characteristics.
(2) The capacity of the site to sustain use and at what level of intensity. (3) The appropriateness of limiting public access to the right to pass and repass depending on such factors as the fragility of the natural resources in the area and the proximity of the access area to adjacent residential uses. (4) The need to provide for the management of access areas so as to protect the privacy of adjacent property owners and to protect the aesthetic values of the area by providing for the collection of litter.
(b) It is the intent of the Legislature that the public access policies of this article be carried out in a reasonable manner that considers the equities and that balances the rights of the individual property owner with the public s constitutional right of access pursuant to Section 4 of Article X of the California Constitution. Nothing in this section or any amendment thereto shall be construed as a limitation on the rights guaranteed to the public under Section 4 of Article X of the California Constitution…
Coastal Act section 30221 states:

Oceanfront land suitable for recreational use shall be protected for recreational use and development unless present and foreseeable future demand for public or commercial recreational activities that could be accommodated on the property is already adequately provided for in the area.

The purpose of the proposed project is to expand and improve public access and recreational opportunities within Beachfront Park. The proposed project will add many recreational facilities and amenities to the park, including but not limited to: Tolowa interpretive trail, Tolowa botanical garden, amphitheater and stage, plazas, inclusive play area, jogging/walking loop, and two restroom buildings. The section of the California Coastal Trail (CCT) adjacent to Elk Creek will be enhanced by incorporating stories of the Tolowa people through the installation of three interpretive nodes.

Additionally, three smaller interpretive stations will be installed along the California Coastal Trail as it parallels Howe Drive. These stations will be solar-powered and offer a place to rest while listening to the history of the Tolowa culture.

Currently, the California Coastal Trail traverses the eastern and southern perimeter of Beachfront Park and then routes north near Battery Point, just west of the Project site (Exhibit 2). The eastern portion of the Coastal Trail will be reconstructed to Stamps Way with the Tolowa Interpretative Trail, a dedicated multiuse path honoring the Tolowa 1-22-0509 (Crescent City Beachfront Park)
21 indigenous people. Trail reconstruction will begin just south of the intersection of Front Street and K Street on the northeastern portion of the Project site and will run the eastern and southern perimeter of the park along Battery Street/Howe Drive until it meets B Street.

The trail will be constructed with vehicular concrete paving to allow access for maintenance vehicles and will conform to all national accessibility standards. The reconstructed portion of the CCT will be approximately 1,200 linear feet and 12 feet wide.

Construction of the proposed project is anticipated to last approximately 13 months, beginning in 2025 and with the goal to complete by summer of 2026. Although there will be temporary access closures during construction, the majority of the CCT trail system and park areas will remain open throughout project construction. The majority of Beachfront Park as well as the inner harbor beach areas, the B Street Fishing Pier, and the Battery Point Lighthouse will also remain open to public access and recreational use throughout construction. The City has provided an annotated construction schedule (shown below in Table 1) and Public Access Plans depicting both temporary impacts on public access, and access trails, roads, and parking areas that will remain open during construction in both 2025 and 2026 (Exhibit 6).

Construction will generally occur between the hours of 7 a.m. and 6 p.m., Monday through Friday, with the occasional need for work on Saturdays. During construction, access to the project area will remain at the existing entrances at Stamps Way and Play Street, and Battery Street via B Street, and alternative accessways will remain open during temporary closures. For example, Play Street may temporarily close during installation of the new playground area, parking lot improvements, and Tolowa garden.

During this time, alternate access via Stamps Way will remain open. Access to the park will also be available along Howe Drive during construction. Construction will be phased to result in the least disturbance possible for the public/park visitors.

Table 1. Anticipated Construction Phasing
Construction Phase and Activity Estimated Duration Timeline Phase 1B – Site and Equipment
Mobilization
1 month April 2026
Phase 1B – Demo 2 months May – June 2026
Phase 1B – Grading & Utilities 4 months July – Oct 2026 Phase 1B – Concrete & Paving 4 months Aug – Nov 2026
Phase 1B – Playground,
Interpretive & Planting
3 months Aug – Oct 2026
Phase 1B – Punch List, Cleanup,
Demobilization
1 month Dec 2026
Phase 1C – Site and Equipment
Mobilization
1 month June 2025
Phase 1C – Demo 1 month Aug 2025
1-22-0509 (Crescent City Beachfront Park)
22 Phase 1C – Grading & Utilities 2 months Aug – Oct 2025 Phase 1B and 1C – Concrete for
all walkways and Tolowa Cultural
Trail
2 months Oct 2025 – Mar 2026
Phase 1B and 1C – Interpretive &
Planting for Cultural Center and
Tolowa Cultural Trail and Nodes
2 months Sept 2025
Road closures are not anticipated during construction and standard traffic control measures (e.g., flagging, signage, barricades and cones) would be used as needed to ensure access to Front Street at all times during construction. Construction equipment and materials will be delivered to the site via the entrances at Stamps Way and/or Play Street via Front Street and Highway 101. Standard traffic control measures will be implemented in accordance with City requirements during construction to avoid interference with traffic flow along Front Street. Such measures may include scheduling major truck trips and deliveries to avoid peak traffic hours, posting warning and detour signs for motorists, setting up temporary lane closure procedures, and placing cones to alert drivers. During improvements to the Del Norte County Visitor/Cultural Center (i.e., removing steps, etc.), the transit center/bus stop would be temporarily moved to a nearby location (e.g., across the street from the current location along Front Street or just to the northeast on K street); thus, any impacts would be limited and short-term.

Therefore, as (1) project construction that would affect public access use will be of relatively short duration, (2) public access will remain available in the project area throughout construction with only limited closures of specific areas for short periods of time, and (3) parking would remain accessible during construction, the Commission finds the proposed development does not have any significant adverse effect on public access, and that the project as proposed is consistent with the coastal access and recreation sections of the Coastal Act.

F. Tribal Consultation & Protection of Archaeological Resources Coastal Act section 30244 states as follows:

Where development would adversely impact archeological or paleontological resources as identified by the State Historic Preservation Officer, reasonable mitigation measures shall be required.

The Project is located within the ethnographic territory of the Tolowa Native American Tribal Group. For thousands of years, the Tolowa have lived in coastal areas and coastal watersheds of Del Norte County and southwestern Oregon. Multiple Tolowa village sites were in the vicinity of Crescent City, with the closest village at Battery Point just to the southwest of Beachfront Park (the village of Tatatum). At the time of EuroAmerican contact, the Tolowa were found residing in eight large coastal villages. Each village claimed a specific section of shoreline and the boundaries of each village tract 1-22-0509 (Crescent City Beachfront Park)
23 were well known and defended if necessary. The Tolowa resided in the coastal villages year-round, moving inland to gather seasonally available resources.

Today, the Tolowa people are represented by various tribal entities, including the federally recognized Tolowa Dee-ni’ Nation, Elk Valley Rancheria, Blue Lake Rancheria, and Big Lagoon Rancheria in California, as well as the Confederated Tribes of Siletz in Oregon. Additionally, they are members of the non-federally recognized Tolowa Nation, located in California. The enrolled membership of these tribal entities is unknown, but Tolowa Dee-ni’ Nation itself has 2,098 enrolled citizens currently. The Tolowa community continues to engage in traditional gathering practices, with activities like smelt fishing camps gaining legal recognition due to their ongoing significance in contemporary Tolowa identity and resource access.

As part of the Beachfront Park community engagement process for designing proposed project components (see Finding IV.A), City staff outreached to Tolowa leaders of the local Tolowa tribes. With direction from representatives from the tribal governments, City staff were directed to begin conversations with each government’s Cultural Committees. The Tolowa Cultural Committee is comprised of three Tolowa tribes (Tolowa Nation, Tolowa Dee-ni’ Nation, and Elk Valley Rancheria), as well as Tolowa representatives from the Del Norte Historic Society, and was formed to allow tribal members to direct the design of the Tolowa elements in the park. Through these meetings tribal elders, tribal members, and tribal staff shared history, ideas for park features, and design suggestions including artwork and pictures from their archives.

These suggestions were approved through Cultural Committees before being added to any design plans and taken to the larger community for feedback. The final, and necessary, step was to get official approval from each of these sovereign nations to use their cultural information in Beachfront Park. City staff presented to both Tribal Councils and received unanimous approval for moving forward with the current designs.

The City also outreached to Tribal Historic Preservation Officers (THPOs) from Melochundum Band of Tolowa Indians, Pulikla Tribe of Yurok People (formerly known as Resighini Rancheria), Tolowa Dee-ni’ Nation, Yurok Tribe, Trinidad Rancheria, Elk Valley Rancheria, and Karuk Tribe, in accordance with AB 52. All THPOs declined the invitation for government consultation with the City of Crescent City.

In addition to the above outreach and coordination efforts by the City, the Tolowa Deeni’ Nation also requested that during construction, access for monitoring by Tribal staff be granted during any excavation activities. This requirement has been incorporated into the project through IS/MND Mitigation Measure CULT-1 and Special Condition 5.

This condition requires that if an area of cultural deposits is discovered during the course of the project, all construction must cease, and a qualified cultural resource specialist must analyze the significance of the find in compliance with state and federal laws. To recommence construction following discovery of cultural deposits or human remains, the Permittee is required to submit report for the review and approval of the Executive Director demonstrating whether any changes to the project are required to protect archaeological resources. If the Executive Director determines that changes to 1-22-0509 (Crescent City Beachfront Park)
24 the project are necessary, and those changes are not de minimis, the Permittee must obtain a permit amendment from the Commission before proceeding with construction.

Therefore, the Commission finds that the proposed project, as conditioned, is consistent with Coastal Act section 30244, as the development includes reasonable mitigation measures to ensure that construction activities will not result in significant adverse impacts to archaeological resources.

G. Geologic and Flood Hazards
Section 30253 of the Coastal Act states, in applicable part, as follows:

New development shall do all of the following:
a. Minimize risks to life and property in areas of high geologic, flood, and fire hazard.
b. Assure stability and structural integrity, and neither create nor contribute significantly to erosion, geologic instability, or destruction of the site or surrounding area or in any way require the construction of protective devices that would substantially alter natural landforms along bluffs and cliffs…
Coastal Act section 30270 states:

The commission shall take into account the effects of sea level rise in coastal resources planning and management policies and activities in order to identify, assess, and, to the extent feasible, avoid and mitigate the adverse effects of sea level rise.

Section 30253 requires in part that new development minimize risk to life and property in areas of high geologic and flood hazards, assure structural integrity and stability, and neither create nor contribute significantly to erosion. The project entails development in an area subject to significant exposure to geologic and flood hazards including strong earthquake shaking, liquefaction, erosion, tsunami inundation, and flooding from wave run-up and storm surge.

Flood and Storm Surge Hazards
The project area is outside of the Federal Emergency Management Agency’s (FEMA) mapped 100-year flood hazard zone. Existing unengineered revetment comprised of irregular rock boulders and concrete rubble lines the shoreline along the southern edge of the park, serving as a seawall for Beachfront Park. The site is separated from the exposed open waters of the Pacific Ocean by the Crescent City Harbor. Two jetties extend into the Pacific Ocean, southwest and southeast of the Project, which dissipate wave energy, reducing the probability for coastal erosion from storm surges or wave runup. The jetty southwest of the Project is divided into a publicly accessible pier, and a longer breakwater constructed of riprap and concrete tetrapods of varying sizes. The jetty to the southeast, which extends to Whaler Island from the Crescent City Harbor, 1-22-0509 (Crescent City Beachfront Park)
25 was previously used by the US Coast Guard, and is constructed from riprap. Thus, the risk of potential impacts to the project site resulting from storm surges or flooding is low.

Tsunami Hazards
The subject property is shown on emergency planning maps published in 2009 and updated in 2021 by the California Emergency Management Agency, California Geologic Survey, and University of Southern California as being within the zone of potential inundation by a tsunami. Crescent City is heavily affected by tsunamis from distant source seismic events and recent evidence suggests that earthquakes may generate large tsunamis every 300 to 700 years along the Cascadia subduction zone, an area off of the Pacific Northwest coast from Cape Mendocino to Puget Sound, where a crustal plate carrying part of the Pacific Ocean is diving under North America.

Crescent City has experienced at least six tsunamis in the last 65 years, the greatest occurring on March 28, 1964. On that date, a series of tsunamis generated from the Richter 9.2 earthquake near Anchorage, Alaska rolled into the Crescent City Harbor and inundated much of the waterfront and downtown area, killing eleven people. The fourth wave was the largest of the set, with a height of approximately 20 to 21 feet. It was preceded by a withdrawal of the water that left the inner harbor almost dry. This fastmoving wave capsized 15 fishing boats. Three other boats disappeared, and eight more sunk in the mooring area. Several other boats were washed onto the beach. Extensive damage was inflicted to the piers. The wave covered the entire length of Front Street, and about thirty blocks of Crescent City were devastated. Overall damage was estimated at between $7.5 - 16 million (1964 dollars). Because of the ongoing risk of future tsunami events, much of the City’s harbor waterfront remains vacant or has been reserved for open space, parks, and other low-occupancy public facilities uses.

The proposed development includes the construction of two restroom facilities that could be inundated and destroyed by a tsunami. All other proposed construction would not result in new buildings that could be inundated, but they could be destroyed by a tsunami, including but not limited to the stage, playground, interpretive nodes, signage, picnic tables, and lighting. Park visitors would be subject to the threat of tsunamis. It is not feasible to raise the park above maximum tsunami levels. However, the risk to park visitors can be minimized through tsunami warning and evacuation efforts.

Tsunami evacuation signage currently exists within and around the project area, as well as throughout Crescent City. Maps are available in both physical and digital format, from Crescent City as well as Del Norte County. The City of Crescent City also engages in public outreach regarding tsunami hazards, including providing fact sheets in hotels/motels, signage along the beaches, mailers to residents, and education in schools. The City of Crescent City also maintains a tsunami evacuation map with 1-22-0509 (Crescent City Beachfront Park)
26 tsunami safety information and evacuation routes2. The Project would not impact evacuation routes, nor the ability to evacuate in the event of a tsunami, as neither barriers nor alterations to Front Street or adjoining streets north of the project area would occur.

As (1) the limited use of the site limits human exposure to tsunami events, (2) safe ground above the inundation area is located in close proximity, and (3) a tsunami warning education and evacuation system is in place, the Commission finds that the proposed development minimizes tsunami hazard risk.

Sea-Level Rise
Although rising sea levels will increase tidal action to Crescent City Harbor in the future, as discussed below the rate and effects of sea level rise would be insignificant relative to the location of existing and proposed structures. The California Ocean Protection Council’s State of California Sea-Level Rise Guidance 2024 Update3, and the Commission’s Sea Level Rise Policy Guidance November 2024 Adopted Update4, both contain a set of sea level rise scenarios for 14 tide gauges throughout California, and both agencies recommend using these scenarios and related information as best available science on sea level rise in California. The values included in these scenarios are slightly lower than the projections included in the 2018 version of the Sea Level Rise Policy Guidance, reflecting the updated body of research on global and regional sea level rise.

Table 2, below, provides the scenarios for Crescent City (measured at NOAA’s North Crescent City Station, ID # 9419750), which has the lowest relative rate of sea level rise in the State due to higher rates of tectonic uplift in that area. This uplift is evidenced by a tide gauge located within Crescent City Harbor, which has recorded an annual drop in sea level of -0.78 millimeters per year5.
2 Crescent City Tsunami Preparedness Information. Humboldt Earthquake Education Center January 2010.
https://www.crescentcity.org/media/Emergency%20Preparedness/Tsunami_Preparedness_Crescent_C ity.pdf
3 Ocean Protection Council Sea-Level Rise Guidance: 2024 Update is accessible online at:
https://opc.ca.gov/wp-content/uploads/2024/05/Item-4-Exhibit-A-Final-Draft-Sea-Level-Rise-GuidanceUpdate-2024-508.pdf 4 The California Coastal Commission’s Sea Level Rise Guidance November 2024 Adopted Update is accessible online at: https://www.coastal.ca.gov/climate/slrguidance.html 5 According to NOAA relative sea level trend data for Station 9419750 (accessible at https://tidesandcurrents.noaa.gov/sltrends/sltrends_station.shtml?id=9419750), the relative sea level trend is -0.78 millimeters/year with a 95% confidence interval of +/- 0.26 mm/yr based on monthly mean sea level data from 1933 to 2023 which is equivalent to a change of -0.26 feet in 100 years. 1-22-0509 (Crescent City Beachfront Park)
27 Table 2. Median Values of Sea Level Scenarios* for Crescent City. 6 Intermediate Intermediate-High High
2030 0.2 0.2 0.2
2050 0.4 0.6 0.8
2070 0.8 1.6 2.3
2100 2.3 3.9 5.6
*Values are displayed in feet
Per the Commission’s adopted 2024 sea level rise guidance, “temporary structures, ancillary development, amenity structures, or moveable or expendable construction may identify a relatively short, expected life such as 25 years or less,” and the low risk aversion scenario may be used for projects that would have limited consequences or a higher ability to adapt.

As this proposed development does not include critical infrastructure, residential living space, or provide another critical need, but rather involves improvements to a park that can be easily removed or relocated, the inherent risk to the public regarding if and when the structures are subject to coastal hazards risk is relatively low. Therefore, the potential for damage to the site and the risk to life and property from flooding has been minimized, consistent with section 30253.

Nonetheless, given that the applicant is proposing development in a hazardous area, the Commission requires the applicant to assume the liability from potential flood or other risks and, therefore, imposes Special Condition 15. This condition requires the landowner to assume the risks of undertaking development on an inherently hazardous site and to waive any claim of liability on the part of the Commission.

Conclusion
For all the reasons set forth above, the Commission finds that the proposed development, as conditioned, assures stability and structural integrity and minimizes risks of geologic and flood hazards consistent with section 30253 of the Coastal Act.

Furthermore, the Commission finds that the proposed project, as conditioned, takes into account the effects of sea level rise consistent with section 30270 of the Coastal Act.

H. Protection of Coastal Waters
Section 30231 of the Coastal Act addresses the protection of coastal water quality and marine resources in conjunction with development and other land use activities. Section 30231 states:
6 Source: 2024 State of CA https://opc.ca.gov/wp-content/uploads/2024/05/Item-4-Exhibit-A-Final-DraftSea-Level-Rise-Guidance-Update-2024-508.pdf 1-22-0509 (Crescent City Beachfront Park)
28 The biological productivity and the quality of coastal waters, streams, wetlands, estuaries, and lakes appropriate to maintain optimum populations of marine organisms and the protection of human health shall be maintained and, where feasible, restored through, among other means, minimizing adverse effects of wastewater discharges and entrainment, controlling runoff, preventing depletion of ground water supplies and substantial interference with the surface water flow, encouraging waste water reclamation, maintaining natural vegetation buffer areas that protect riparian habitats, and minimizing alteration of natural streams.

Beachfront Park is located on the northwest shore of Crescent City Harbor. The adjacent Crescent City Harbor waters provide habitat for a variety of fish and wildlife species. Coho salmon (Oncorhynchus kisutch) pass seasonally through the harbor as they make their migration to and from spawning grounds within the Elk Creek drainage, and marine mammals, including the Steller sea lion (Eumetopias jubatus), utilize harbor sites as haul-outs and for feeding.

The proposed locations of the Tolowa interpretive trail and interpretive nodes, botanical garden, and cultural center entryway and gateway structures, are in close proximity to the mouth of Elk Creek. Beachfront Park sits atop filled former tidelands created from dredge spoils and sand collected after the 1964 tsunami event. The current project proposes excavation, grading, tree removal, and placement of additional dredge spoils from Crescent City Harbor. Fill material generated from construction of pathways, playground and plaza areas will be reused onsite to the extent possible, and approximately 7,500 cubic yards of dredge spoils from the harbor will be imported to be used as fill. The City is required to obtain a conditional waiver from the Regional Water Quality Control Board to use the dredge spoils for this purpose, as referenced in Finding D.

The project also proposes installation of rain gardens, vegetated drainage swales with French drains, and filter strips to capture stormwater and prevent surface runoff from new impervious surfaces, sized to meet California stormwater quality standards.

Approximately six acres of total ground disturbance is proposed. Excavation depths for project elements will range from approximately two to four feet. For placement of hardscape surfaces (e.g., walking paths, playground and parking areas) excavation will occur at a depth ranging from 0.5 to 1.5 feet, and two to six feet for structural elements (e.g., playground equipment, interpretive nodes, restrooms). Excavation for rain gardens and filter strips will occur at a depth of two to four feet. Additionally, new subsurface utilities associated with the project will be excavated generally to two to four feet, with a maximum of ten feet for a sewer line. Project components such as the playground, walking paths and plaza areas will require grading and placement of imported fill, which will come from tested and approved dredge spoils from Crescent City Harbor. Table 3 below shows the approximate amounts of imported materials to be used on-site.
1-22-0509 (Crescent City Beachfront Park)
29 Table 3. Imported Materials and Quantities
Import Material Estimated Quantity
Engineered Fill 400 Cubic Yards
Dredge Spoils 7,500 Cubic Yards
Concrete 1,500 Cubic Yards
Rock 1,800 Cubic Yards
Topsoil 2,600 Cubic Yards
Raingarden Soil Blend 300 Cubic Yards
To protect nearby marine resources, the City proposes a number of erosion and sediment control and pollution prevention measures during project construction including: (a) staging all equipment on the upper terrace of the park on paved, graveled, or ruderal habitat surfaces; (b) installing silt fencing and fiber rolls as perimeter sediment control barriers; (c) stockpiling soils at least 100 feet from Elk Creek wetlands; (d) covering exposed surfaces with straw mulch for soil stabilization; (e) seeding all bare soils with natural turf after the completion of construction; and (f) following Best Management Practices (BMPs) for construction vehicle and equipment cleaning, fueling, and maintenance. Construction activities also require preparation of a Stormwater Pollution Prevention Plan (SWPPP) due to disturbance of over one acre.

The City’s contractor will prepare the SWPPP for implementation during project construction. This includes the use of BMPs to prevent pollutants and sediment from entering nearby Elk Creek and open coastal waters.

To ensure that the applicant adheres to appropriate construction-related BMPs for dust control and other water quality protection measures, the Commission attaches Special Condition 3. This condition requires, in part, the proper disposal of construction-related debris, the covering of stockpiles whenever there is a potential for rain to prevent polluted water runoff from the site, and the use of appropriate BMPs for erosion and runoff control as detailed in the current California Storm Water Quality Best Management Handbooks. Additionally, Special Condition 4 requires submittal of the final SWPPP for the Executive Director’s review and approval prior to commencement of construction.

New Inclusive Play Area
The proposed project includes construction of a new accessible and inclusive play area adjacent to the existing “Kid Town” play area (Exhibit 2). The project design includes the use of soft, poured-in-place (PIP) rubber surfacing (approximately 5,725 s.f.), concrete paving along a semi-circular path, artificial turf (approximately 1,590 s.f.), fencing, and picnic tables. New play equipment (e.g., swings, boat, tree, etc.), as well as a water play area (e.g., sand, water pump/channel, boulders, etc.) would also be installed. The proposed use of artificial turf and PIP synthetic rubber raises several concerns due to their potential adverse impacts to the environment and biological resources as discussed below.
1-22-0509 (Crescent City Beachfront Park)
30 Artificial turf
In general, artificial turf is not recommended in the coastal zone. While it may offer low maintenance and no water needs, it poses significant environmental risks in areas near coastal waters, such as the subject site. While similar projects have been permitted through past Commission action, the understanding of the potential impacts of artificial turf use upon resources protected by the Coastal Act has been evolving and is an active field of scientific study. Recent Commission actions have raised concerns over the use of artificial turf in projects due to issues of plastic degradation, chemical leaching, water quality impacts, offsite transport of microplastics, and sustainability aspects associated with the increased burden to plastic-saturated waste streams7. Runoff and wind from artificial turf can carry pollutants such as heavy metals, chemicals, and microplastics, which can bioaccumulate and harm terrestrial and marine ecosystems. In addition, it is far hotter than natural surfaces if exposed to sunlight and not shaded, as is the case here. Animals, including small lizards or small mammals, will avoid artificial turf due to its heat. Thus, the proposed permeable, synthetic grass must be eliminated from the landscape plan.

For these reasons, the Commission finds it necessary to exclude the installation of any artificial turf. Special Condition 11 requires the City to submit Final Revised Playground Plans that include the installation of natural turf – as opposed to artificial turf – at the subject site and addressing any additional site improvements required for the same. The revised plans shall include a detailed plan for the installation of natural turf – as opposed to artificial turf – at the subject site, including plans for grading, drainage, irrigation, and any additional site improvements required for the same. The plans shall be prepared by a qualified engineer and/or other qualified professional and shall include technical analyses addressing drainage, grading, and irrigation required for the proposed development. The plan shall include a description of best management practices (BMPs) to be employed during construction activities. No elements of artificial turf shall be included in the Final Revised Project Plans.

Synthetic rubber
The City has stated that the new playground area design is driven by the need to improve accessibility of the playground for all people, regardless of physical abilities and remove barriers to accessibility that exist in the adjacent playground area where wood chip surface materials are currently used. As such, the applicant is proposing to use a PIP rubber safety surfacing consisting of a 3/8-inch-thick wearing layer underlain by a variable-thickness cushioning layer (thickness determined by fall height). PIP rubber playground surfacing typically consists of a base layer of 100% post-consumer recycled 7 Recent permit actions prohibiting the use of artificial turf include but are not limited to: CDP 5-24-0207 (Dunnwald Family Trust) accessible online at:
https://documents.coastal.ca.gov/reports/2025/4/w17b/w17b-4-2025-report.pdf; Notice of Impending Development UCS-NOID-0002-23 (Baseball Stadium Turf), accessible online at:
https://documents.coastal.ca.gov/reports/2023/12/W13.1a/W13.1a-12-2023-report.pdf, and CDP 3-22- 0463 (San Luis Obispo County Department of Airports) accessible online at:
https://documents.coastal.ca.gov/reports/2023/10/F16a/F16a-10-2023-report.pdf 1-22-0509 (Crescent City Beachfront Park)
31 shredded waste vehicle tires, which contain the synthetic rubber SBR (Styrene Butadiene Rubber), held together with a polyurethane binder; and a top surface layer consisting of small synthetic rubber granules of recycled post-industrial EPDM (Ethylene Propylene Diene Monomer) or TPV (Thermoplastic Vulcanizates) held together with an aromatic or aliphatic urethane binder. These materials are typically designed to meet or exceed guidelines set by the Americans with Disabilities Act (ADA) and satisfy the required critical fall height compliance with the American Society for Testing and Materials (ASTM) F1292.

In recent permit actions8, the Commission’s water quality specialist has determined that synthetic rubber playground surface materials adversely impact the environment and biological resources, and potentially human health due to the numerous hazardous chemicals and compounds including heavy metals (e.g., lead, zinc, mercury, and arsenic), polyaromatic hydrocarbons (PAHs), volatile organic compounds (VOCs), 6- phenylenediamine (6-PPD), phthalates, organophosphate esters (OPEs), and per- and polyfluoroalkyl substances (PFAS), among others, that potentially pose problems for human health, the environment, and aquatic life. The use of synthetic rubber playground surfaces is further explained in CDP 5-23-0345 and the exhibits on that staff report include a memo prepared by Vanessa Metz, Ph.D., Commission Senior Environmental Scientist dated June 27, 20249.

In its conditional approval of CDP 5-23-0345, the Commission required alternative playground surfacing materials and prohibition of PIP synthetic rubber materials, finding that the analyses provided by Dr. Metz demonstrated the use of the proposed Pouredin-Place rubber playground surfacing materials raises significant environmental concerns. The Commission’s adopted findings state in part the following:

The base layer of the proposed material is comprised of shredded waste tires, which contains numerous hazardous chemicals and compounds including heavy metals (e.g., lead, zinc, mercury, and arsenic), polyaromatic hydrocarbons (PAHs), volatile organic compounds (VOCs), 6-phenylenediamine (6-PPD), phthalates, organophosphate esters (OPEs), and perand polyfluoroalkyl substances (PFAS), among others, that potentially pose problems for human and environmental health. Some of the additives found in waste tire rubber (including stabilizers, vulcanization agents, and antiozonants) are considered toxic to a wide range of aquatic life and have long-lasting adverse effects. Also, shredded 8 Recent permit actions prohibiting the use of PIP synthetic rubber include but are not limited to: CDP 6- 23-0627 (City of San Diego playground and basketball court renovations at Playa Pacifica Park), accessible online at https://documents.coastal.ca.gov/reports/2024/12/Th5b/Th5b-12-2024-report.pdf; and 5-23-0345 (Newport Mesa Unified School District replacement of an existing beach playground), accessible online here: https://documents.coastal.ca.gov/reports/2024/7/Th15b/Th15b-7-2024-report.pdf 9 Accessible online here: https://documents.coastal.ca.gov/reports/2024/7/Th15b/Th15b-7-2024- exhibits.pdf#page=9
1-22-0509 (Crescent City Beachfront Park)
32 tire rubber and EPDM synthetic rubber granules are microplastics that can be dislodged from the playground and distributed into the environment (including the soil, air, waterways, and the ocean) where both the microplastic particles and their leachates can have potential adverse ecological effects.

The top layer of the playground surface (also known as the “wear layer”) that consists of small granules of synthetic rubber ("post-industrial EPDM rubber" or TPV) with a urethane binder is also problematic. One significant concern is that due to both layers of the playground surface being porous, rainwater (or wash water used for cleaning) passes through the top layer of EPDM and also through the base layer of shredded tires, potentially leaching toxic chemicals from these materials into the environment. Another proposed option for the top layer is TPV (Thermoplastic Vulcanizates) synthetic rubber granules that are made from polypropylene and EPDM synthetic rubber, which is also of concern. Both EPDM and TPV synthetic rubber granules contain several of the same hazardous chemicals as waste tire rubber does, including lead, PAHs, VOCs, and OPEs.

TPV is also more susceptible to shedding or breaking away small granules of rubber as the playground surface wears, compared to EPDM.

Thus, the City’s proposed use of PIP synthetic rubber surfacing raises significant concerns due to its potential adverse impacts to the environment and biological resources and cannot be used for playground surfacing. In order to avoid potential adverse impacts to biological resources raised by the use of the proposed synthetic rubber and waste tire playground surfacing materials, the Commission imposes the following special conditions: Special Condition 9 prohibits the proposed Poured-inPlace rubber playground surface product and similar types of materials; Special Condition 10 indicates the types of acceptable playground surfacing material(s) to minimize the discharge of hazardous chemicals and microplastic pollution into the environment, Special Condition 11 requires submittal of Final Playground Plans including acceptable alternative playground surfacing material(s), and Special Condition 12 requires maintenance of Playground Surfacing Materials.

Therefore, the Commission finds that the proposed development, as conditioned, is consistent with section 30231 of the Coastal Act, because the project as conditioned will protect marine resources, water quality, and the biological productivity of coastal waters and wetlands.

I. Visual Resources
Coastal Act section 30251 states in applicable part:

The scenic and visual qualities of coastal areas shall be considered and protected as a resource of public importance. Permitted development shall be sited and designed to protect views to and along the ocean and scenic coastal areas, to minimize the alteration of natural land forms, to be visually compatible with the character of surrounding areas, and, where feasible, to restore and enhance visual quality in visually degraded areas…
1-22-0509 (Crescent City Beachfront Park)
33 The project site provides variable views of Elk Creek, Crescent City Harbor, the Pacific Ocean, and Battery Point Lighthouse. The project site within Beachfront Park is relatively flat but variable gentle slopes exist throughout the project area. The project areas along the waterfront and along Elk Creek are approximately 15 feet in elevation, whereas Play Street and Front Street are approximately 10 feet in elevation.

Interpretive sculptures at each node along the Tolowa interpretive trail include a sculptural redwood tree, burden basket, and canoe and have been designed with openings that allow the public to see the landscape in the distance. The redwood node will be approximately ten feet tall and 100 square feet. The burden basket node will be approximately eleven feet tall and 96 square feet. The canoe node will be approximately seven feet tall and 105 square feet (Exhibit 3). Each node will be constructed of metal on concrete foundations. The open design encourages interaction with interpretive nodes and prevents complete obstruction of coastal views. Significant unobstructed coastal views will continue to remain throughout Beachfront Park.

The project also includes construction of an amphitheater (i.e., stage and elevated planted grassy berm for seating), where seasonal outdoor performances will be offered.

The amphitheater will be located immediately south of Play Street and west of the Fred Endert Municipal Pool parking lot. Elements include a concrete stage and foundation, which will accommodate temporary installations of lighting and sound, near the southeast corner of Stamps Way and Play Street. The height of the stage will not exceed 30 inches. The stage will also include a dome-shaped cover of the same design as is installed at Azalea Park in Brookings, Oregon (Exhibit 3). The stage cover will be retractable and locked in the closed position and will only be raised during events. To ensure the amphitheater stage cover does not interfere with coastal views when not in use, Special Condition 16 memorializes the City’s proposal to limit its use to during events only. When the stage cover is in use during events, it will be approximately 26 feet tall. Lawn seating in front of the central staging area will be accessible via new concrete paths, and will consist of approximately 23,500 square feet of planted grassy area, and an adjacent 40,200 square-foot topographic relief/berm, approximately five feet in height above the existing grade, which will provide additional seating. There are no existing blue water views in the proposed location of the amphitheater and berm due to upward slopes from north to south. Thus, the amphitheater and berm will not adversely affect views of the harbor or ocean. There will be new views from the berms of the harbor and ocean.

Proposed project lighting includes hip-height bollards to illuminate pathways around the amphitheater. The bollards will be down-cast and will not exceed 3000K in color temperature. The two restroom buildings will have mounted downcast lighting.

Backlighting is proposed to illuminate the park entry way signage at Stamps Way. This backlighting will not exceed 3000K in color temperature, and will comply with Dark Sky guidelines. No new overhead lighting would be added to the parking areas beyond what is currently there. The limited nighttime lighting, primarily at the park entrance, restrooms and bollard lighting (at hip level) to illuminate pathways would not degrade 1-22-0509 (Crescent City Beachfront Park)
34 the scenic quality of the park and adjacent habitats and would be fleetingly visible to motorists, pedestrians or bicyclists on Front Street.

To protect the visual character of the area as well as prevent the cumulative impacts of glare to the visual resources of the area, the Commission attaches Special Condition 13 which requires the submittal of revised final plans within six months of issuance of CDP 1-22-0509 and not less than 30 days prior to installation or retrofit of any lighting facilities demonstrating that all exterior lighting associated with the proposed development shall be low-wattage, downcast shielded, and that no glare is directed into adjoining environmentally sensitive areas. Maximum color temperature shall not exceed 2,700K, unless it can be demonstrated that required safety measures cannot be met with such features, and in that case color temperature cannot exceed 3,000K.

In summary, the proposed development as conditioned will not adversely affect views to or along the coast, result in major landform alteration, or be incompatible with the character of the surrounding area. The Commission therefore finds that for all of the reasons discussed above, the project, as conditioned, will be consistent with section 30251 of the Coastal Act.

J. Environmentally Sensitive Habitat Areas
Section 30107.5 of the Coastal Act defines “environmentally sensitive area” as:
…any area in which plant or animal life or their habitats are either rare or especially valuable because of their special nature or role in an ecosystem and which could be easily disturbed or degraded by human activities and developments.

Section 30240 of the Coastal Act states:
a. Environmentally sensitive habitat areas shall be protected against any significant disruption of habitat values, and only uses dependent on those resources shall be allowed within those areas.
b. Development in areas adjacent to environmentally sensitive habitat areas and parks and recreation areas shall be sited and designed to prevent impacts which would significantly degrade those areas, and shall be compatible with the continuance of those habitat and recreation areas.

Elk Creek borders the eastern portion of Beachfront Park and is separated from the park by large concrete revetment along the shoreline of the Elk Creek Estuary. The California Coastal Trail crosses Elk Creek and then continues along the beachfront adjacent to the park. The proposed locations of the Tolowa interpretive trail and interpretive nodes, botanical garden, and cultural center entryway and gateway structures, are in close proximity to the mouth of Elk Creek. Elk Creek is a Class 1, Third Order coastal stream that supports small runs of anadromous and resident salmonids, including coho salmon (Oncorhynchus kisutch), Chinook salmon (Oncorhynchus tshawytscha), steelhead (Oncorhynchus mykiss), and cutthroat trout (Oncorhynchus clarki). As described in Finding IV.H above, construction staging for the 1-22-0509 (Crescent City Beachfront Park)
35 project components adjacent to Elk Creek would occur further upland in the park and work limits along the riparian area will be clearly marked with flagging. Silt fences will be installed as needed to prevent any silt and sediment transport into Elk Creek, and any stockpiled soils will be located away from Elk Creek (by at least 100 feet). Seasonal work windows will be implemented where possible to avoid construction in the rainy season.

The mouth of Elk Creek and surrounding tidal flats attract a large congregation of resting and foraging birds. The project area also provides nesting and roosting habitat for several species of migrating birds and also supports resident birds. Birds using the project sites may include sensitive species such as raptors and other species protected under Fish and Game Code sections 350310 and 3503.511. One birding guide of Del Norte County describes the mouth of Elk Creek as an excellent spot to view Western, Glaucous-winged, Mew, California, Heermann’s and Herring Gull, Caspian Tern, Elegant Tern, Black-crowned Night-Heron, Western Grebe, Osprey, Great Egret, Red Phalarope, Whimbrel and Sanderling.12
The applicant proposes to remove approximately 45 previously planted landscaping trees. The trees to be removed are primarily located in the proposed amphitheater area, and consist of Monterey cypress (Hesperocyparis macrocarpa) and Monterey pine (Pinus radiata) species (not native to Del Norte County)13. The City has provided tree protection and removal plans showing the location of each tree proposed to be removed or retained and protected during construction. Trees to be retained within proposed construction areas will be fenced off with tree protection fencing.

Trees proposed for removal may support bird nests, and removal of vegetation during the nesting bird season (generally March 1 to August 15) could result in direct mortality of adults or young birds and the destruction or abandonment of active nests. Indirect impacts such as increased noise and visual human activity associated with construction activities could result in the disturbance of normal nesting behaviors, reduction in prey availability, and degradation of overall nesting habitat. These disturbances could cause 10 Fish and Game Code section 3503 states “It is unlawful to take, possess, or needlessly destroy the nest or eggs of any bird, except as otherwise provided by this code or any regulation made pursuant thereto.”
11 FGC section 3503.5 states “It is unlawful to take, possess, or destroy any birds in the orders Falconiformes or Strigiformes (birds-of-prey) or to take, possess, or destroy the nest or eggs of any such bird except as otherwise provided by this code or any regulation adopted pursuant thereto.” 12 http://www.oregoncoastbirding.com/PDFs/5%20California%20Redwoods%20Listings.pdf 13 Monterey cypress is native to California but has been widely cultivated and planted in many non-native areas for landscaping purposes. Monterey pine is not native to Del Norte County. Monterey pine is a native tree from Central and Southern California to Baja California. However, cultivars of Monterey pine have been developed and widely planted for economic and ornamental purposes for decades. These cultivars are very invasive and displace native habitats where they would not normally be found. 1-22-0509 (Crescent City Beachfront Park)
36 nest abandonment and death of young or loss of reproductive potential at active nests located in or near the project area.

However, these potential adverse impacts to nesting birds as a result of the project can be avoided if (1) surveys for active nests are conducted if vegetation removal occurs during the bird nesting season, and (2) appropriate buffers around any identified active nests are established to protect sensitive bird nest habitat areas from disturbance.

Special Condition 14 includes these nesting bird protection requirements.

Beachfront Park also supports a scattered population of Wolf’s evening primrose (Oenothera wolfii), a rare plant with a state ranking of S114 and a California Rare Plant Rank of 1B.1.15 Wolf’s evening primrose is found in coastal sand dunes, bluffs, and sandy roadsides along the Pacific coast north of Cape Mendocino in northern California and southern Oregon. The greatest threat to this rare, native species is hybridization with Oenothera glazioviana, an introduced ornamental. The hybrid appears to be more aggressive than either parent, displacing the native Wolf’s evening primrose and threatening its genetic integrity. Because of the serious threat of genetic dilution to the endemic Pacific coast’s Wolf’s evening primrose posed by hybrid plants, the habitats of these hybrid plants are not considered to be Environmentally Sensitive Habitat Area (ESHA), whereas genetically pure populations of Wolf’s evening primrose are ESHA.

Because Wolf’s evening primrose genetic integrity and persistence is threatened by hybridization, the establishment of genetically pure populations in areas isolated from Oenothera glazioviana and hybrid individuals is critical to saving this rare species. 16 Wolf’s evening primrose is typically a biennial, germinating during the first year and producing rosettes that then bolt in the spring of the second growing season and produce flowers by May or June. Seed set occurs in August and September, followed by senescence (Imper, 1997). Disturbance of any Primrose habitat prior to the natural dispersal of seed from the plants would impair the regeneration of native Primrose at the site. If instead the Primrose individuals are allowed to naturally disperse seed prior to construction, Primrose plants would have the opportunity to regenerate in accordance with the plant’s normal life cycle and the subsequent disturbance is less likely to cause any significant adverse harm to the species.

Zack Larson and Associates completed a biological assessment for the Crescent City Storm Drain Project, including four surveys in 2018 and a follow up in 2019 (Larson & Assoc. 2019). Subsequently, SHN performed follow-up surveys of Beachfront Park in 14 Plants with an S1 rank are critically imperiled in California. 15 Plants with a 1B rank are rare, threatened, or endangered in California and elsewhere, and the .1 threat rank indicates that the species is seriously threatened in California (over 80% of occurrences threatened/ high degree and immediacy of threat).
16 Center for Plant Conservation (2010). CPC National Collection Plant Profile: Oenothera wolfii.

Retrieved from
https://web.archive.org/web/20150918173701/http:/www.centerforplantconservation.org/Collectio n/CPC_ViewProfile.asp?CPCNum=3004
1-22-0509 (Crescent City Beachfront Park)
37 2022 and 2023 and mapped rare plants (SHN 2023). The highest concentration of the plant within the project area is in the northeastern area west of Elk Creek (SHN 2023).

All non-flowering individuals will be protected in place and will be considered native species until they flower.

Additionally, the City of Crescent City as the lead agency for CEQA review prepared a Mitigated Negative Declaration and Mitigation Monitoring and Reporting Plan (MMRP) (Exhibit 5). The MMRP stipulates mitigation measures to reduce impacts to biological resources to a less than significant level. These include Mitigation Measure BIO-1, which requires in part that Wolf’s evening primrose plants within 100 feet of project construction will be fenced off to prevent trampling by construction workers or equipment, and erosion control devices will be placed between the road construction work and the Wolf’s evening primrose individuals to prevent sediment and other materials generated by construction from coming into contact with the rare plant habitat.

Mitigation Measure BIO-1 also specifies that the Project’s ground disturbing activities and construction will take place entirely outside of the rare plant environmentally sensitive habitat area (ESHA) and a 100-foot buffer will be put in place to prevent any trampling or other disturbance, prior to any ground disturbing activities or staging of equipment. For construction of Project components (e.g., the proposed Tolowa Interpretive Plaza and Trail) where it may not be feasible to maintain a 100-foot buffer from ESHA, construction staging would occur further upland in the park and stockpiling of any soils at least 100 feet away, work limits would be clearly marked with temporary fencing, and silt fences would be installed as needed. The applicant proposes to complete earth-moving work during seasonal work windows (summer and early fall dry season) to minimize the risk of erosion and sediment discharge from rain events. To ensure that the City implements ESHA protection measures as proposed, the Commission attaches Special Condition 3A. This condition requires that the permittee undertake development in accordance with the protocols and measures of the MMRP (Exhibit 5). Additionally, Special Condition 3B limits the timing of all earth-moving activities to during the dry season period of May 15 through November 15; and requires additional measures in the latter part of that construction window such that any earthmoving activity conducted between October 16 and November 15 shall be subject to additional site preparation, rain event, and erosion control procedures.

The Commission finds that ESHA located near the site could be adversely affected if non-native, invasive plant species were introduced in landscaping at the site. Introduced invasive exotic plant species could physically spread into ESHA and displace native and/or rare vegetation thereby disrupting the values and functions of the ESHAs. The seeds of exotic invasive plants could also be spread to nearby ESHA by wind dispersal or by birds and other wildlife. The City is proposing landscaping as part of the proposed Tolowa Botanical Garden, playground, and waterfront areas and is additionally proposing to reseed areas disturbed by construction for erosion control. The City has prepared a planting plan using locally native species that the Tolowa people traditionally 1-22-0509 (Crescent City Beachfront Park)
38 used for medicinal, nutritional, and ceremonial purposes. The Commission attaches Special Condition 6 to ensure that only native and/or non-invasive plant species are planted on the subject property. As conditioned, the proposed project will ensure that the ESHA near the site is not significantly degraded by any future landscaping that would contain invasive exotic species.

With the mitigation measures discussed above, which are designed to minimize any potential impacts to the adjacent ESHA, the project as conditioned will not significantly degrade adjacent ESHA and will be compatible with the continuance of the habitat area.

Therefore, the Commission finds that the project as conditioned is consistent with section 30240(b) of the Coastal Act.

K. California Environmental Quality Act (CEQA)
The City of Crescent City served as the lead agency for the project for California Environmental Quality Act (CEQA) purposes. The City adopted a Mitigated Negative Declaration for the project on April 21, 2025 (SCH# 2025030222). In addition, the Coastal Commission’s review and analysis of land use proposals has been certified by the Secretary of Resources as being the functional equivalent of environmental review under CEQA (14 CCR § 15251(c).)
Section 13096 of the Commission’s regulations requires Commission approval of CDP applications to be supported by a finding showing the application, as modified by any conditions of approval, is consistent with any applicable requirement of the California Environmental Quality Act (CEQA). Section 21080.5(d)(2)(A) of CEQA prohibits approval of a proposed development if there are any feasible alternatives or feasible mitigation measures available that would substantially lessen any significant adverse effect the proposed development may have on the environment.

Accordingly, this report has discussed the relevant coastal resource issues with the proposal and the Commission incorporates its findings on Coastal Act consistency at this point as if set forth in full. No public comments regarding potential significant adverse environmental effects of the project were received by the Commission prior to preparation of the staff report. As discussed above, the project has been conditioned to be consistent with the policies of the Coastal Act. As specifically discussed in these above findings, which are hereby incorporated by reference, mitigation measures that will minimize or avoid all significant adverse environmental impacts have been required.

As conditioned, there are no other feasible alternatives or feasible mitigation measures available that would substantially lessen any significant adverse impacts, either individually or cumulatively, that the activity may have on the environment. Therefore, the Commission finds that the proposed development, as conditioned to mitigate the identified impacts, can be found to be consistent with the requirements of the Coastal Act to conform to CEQA.
1-22-0509 (Crescent City Beachfront Park)
39 APPENDIX A
Application File for CDP Application No. 1-22-0509
Imper, D.K. (1997). Ecology and conservation of Wolf’s evening primrose in northwestern California. In Kaye, T.N., A. Liston, R.M. Love, D.L. Luoma, R.J.

Meinke, and M.V. Wilson, eds. Conservation and management of native plants and fungi. Native Plant Society of Oregon, Corvallis, Oregon.

Larson and Associates. (2019). Biological Assessment for the “C” Street Storm Sewer Rehabilitation Project. Prepared for the City of Crescent City, Del Norte County, California.

SHN Engineers & Geologists. 2023. Wolf’s Evening-primrose Population Assessment of Beachfront Park prepared for the City of Crescent City. Survey dates, December 6, 2022, August 3, 2023.

STATE OF CALIFORNIA - NATURAL RESOURCES AGENCY GAVIN NEWSOM, GOVERNOR

CALIFORNIA COASTAL COMMISSION

NORTH COAST DISTRICT OFFICE
1385 8th STREET SUITE 130
ARCATA, CA 95521
VOICE (707) 826-8950
W10a
CDP APPLICATION NO. 1-22-0509
(CITY OF CRESCENT CITY)
MAY 7, 2025

EXHIBITS
Table of Contents
Exhibit 1 – Location Maps
Exhibit 2 – Site Plans
Exhibit 3 – Design Plans and Visual Renderings
Exhibit 4 – Project Description
Exhibit 5 – Mitigation Monitoring and Reporting Plan (MMRP) From 2025 IS/MND Exhibit 6 – Public Access Plan
Exhibit 7 – Map of Hybrid and Native Wolf’s Evening Primrose Locations Project Location

Page 1 of 2 ends

Scale 1:10,000 feet
Lauff Ave Lauff Ave
Pacific Ave Grand St
A St
Gainard St
S Pebble Beach Dr
Gary St
I St
Macken Ave
J St
Pacific Ave
K St
E St
GS
H St
t
6th St
Me
7th St
Lauff Ave
9th St
A St
L St
M St Jedediah Smith
Square
I St
FSt F St
D St
3rd
W9
St
th St
4th St
6th St
6th St
K St
Wendell St
7th St
ESt E St
H St
W8th St
Howe Dr
8th St
SB St
J St
S A St
9th St
Front St
A St
L St
M St
Beachfront
Park
California
Coastal National
Monument
Crescent City
Elk Creek
B
Union St
Elk Creek
101
Broad St
Starfish Way
Elk Valley Rd
RedwoodHwy
Cr
B
k 0 500 1,000 2,000Feet
Beachfront Park
Brookings
Six Rivers
National Forest
Crescent City
Project
Location

Page 2 of 2 ends

0’ 60’ 120’
N
BEACHFRONT PARK CRESCENT CITY, CA FEBRUARY 2023GENERAL DEVELOPMENT PLAN - PRELIMINARY 1 2
3 4
5 7
8 9
11 10
12 13
14 15
16 17
2 6 18
18 19
20 21
22 23
24 26
27 28
29 30
31 32
33 34
35 36
37 38
39 40
41 43 43
44 45
42 LEGEND:1 BATTERY POINT OVERLOOK PLAZA2 EXISTING RESTROOM TYP. ALL OTHERS PROPOSED.3 MAINTENANCE BUILDING AND YARD4 FENCED DOG PARK (SMALL AND LARGE DOGS)5 LABYRINTH6 ASPHALT PUMP TRACK7 DIRT JUMP ZONE8 NORTHCOAST MARINE MAMMAL CENTER9 TENNIS AND PICKLEBALL COURTS10 RECONFIGURED PARKING AREA11 GREAT LAWN WITH SOCCER FIELDS12 BERM WITH A MASSING OF GRASSES13 TOLOWA INTERPRETIVE TRAIL14 WATERFRONT OVERLOOK15 PICNIC AREA 16 COVERED SHELTER 17 EXISTING SHELTER 18 EVENT SPACE19 PARKING LOT20 EXISTING PLAY AREA21 INCLUSIVE PLAY AREA22 HIGH POINT23 SISTER CITY PLAZA 24 EVENT STAGE25 AMPHITHEATER26 GRASS TERRACES 27 KINETIC SCULPTURE28 WATERFRONT PLAZA 29 AMPHITHEATER BERM30 WATERFRONT OVERLOOK 31 PLANTING STRIP (TYPICAL)32 FRED ENDERT MUNICIPAL POOL33 BUS PARKING (3) 34 TOLOWA GARDEN EDIBLE PLANTS35 TOLOWA GARDEN MEDICINAL PLANTS36 TOLOWA GARDEN CEREMONIAL PLANTS37 TOLOWA ENTRY PLAZA38 TOLOWA INTERPRETIVE PLAZA39 DISCOVERY CENTER40 RIPARIAN FOREST41 ELK CREEK OVERLOOK42 POINT OF HONOR43 GATEWAY SIGNS44 DAYLIGHTED ELK CREEK45 EXISTING TETRAPOD AT S CURVES

TOLOWA INTERPRETIVETRAIL EXTENTS
25

Page 1 of 6 ends

ŝƚLJŽĨƌĞƐĐĞŶƚŝƚLJ
ĞĂĐŚĨƌŽŶƚWĂƌŬ/ŵƉƌŽǀĞŵĞŶƚƐWƌŽũĞĐƚ

Page 2 of 6 ends
Page 2 of 6 ends

ŝƚLJŽĨƌĞƐĐĞŶƚŝƚLJ
ĞĂĐŚĨƌŽŶƚWĂƌŬ/ŵƉƌŽǀĞŵĞŶƚƐWƌŽũĞĐƚ

Page 3 of 6 ends
Page 3 of 6 ends

ŝƚLJŽĨƌĞƐĐĞŶƚŝƚLJ
ĞĂĐŚĨƌŽŶƚWĂƌŬ/ŵƉƌŽǀĞŵĞŶƚƐWƌŽũĞĐƚ

Page 4 of 6 ends
Page 4 of 6 ends

ŝƚLJŽĨƌĞƐĐĞŶƚŝƚLJ
ĞĂĐŚĨƌŽŶƚWĂƌŬ/ŵƉƌŽǀĞŵĞŶƚƐWƌŽũĞĐƚ
EŽƚĞ͗dŚĞ^ƵƌǀĞĞƌŵƐĂŶĚƚŚĞŐĂƚĞǁĂLJĨĞĂƚƵƌĞŶŽƌƚŚŽĨƚŚĞ^ƵƌǀĞ ĞƌŵƐĂƌĞŶŽƚǁŝƚŚŝŶƚŚĞŽĂƐƚĂůŽŶĞĂŶĚƚŚĞƌĞĨŽƌĞĂƌĞŶŽƚƐƵďũĞĐƚƚŽ WϭͲϮϮͲϬϱϬϵ͘

Page 5 of 6 ends
Page 5 of 6 ends

Beachfront Park Construction Staging Areas – 2025 & 2026 A – Material Storage – Dry good lay down area – Playground Equipment, Piping, Inlets, Signage B – Amphitheater Fill Soil Storage – Store excavated material, sod, trench excavation, allowable fill material until construction of landscape mound for Amphitheater grass seating. All excavated waste material – broken asphalt, concrete, demolition waste, to be hauled directly to proper disposal location.

AB

Page 6 of 6 ends

CRESCENT CITY BEACHFRONT PARK | JUNE 25, 2024

STAMPS WAY ENTRY

Page 1 of 15 ends

CRESCENT CITY BEACHFRONT PARK | JUNE 25, 2024

INTERPRETIVE NODES

Page 2 of 15 ends

CRESCENT CITY BEACHFRONT PARK | JUNE 25, 2024

PLAZAS AND PAVING AREAS
This element has been removed from the project

Page 3 of 15 ends

The following photos show current views from within Beachfront Park, in the area of the proposed amphitheater, where existing sloped topography obscures views of the ocean until one moves closer to the southern portion of Beachfront Park.

Pa
ge 4 of 15
Current Coastal Views at Proposed Amphitheater Site
Pa
ge 5 of 15
sample Amphitheater Stage Cover, AzaleaPark, Brookings, Oregon 70'-0"
5'-0" MIN. TYP.
5'-0" MIN.

APPROXIMATE OUTLINE

OF AWNING AT FOUNDATION
1/4"=1'-0" 1 AWNING / CANOPY FOUNDATION

APPROXIMATE

OUTLINE OF RAISED

CONCRETE STAGE
4" THICK SLAB ON GRADE
w/ #4 @ 16" o.c.

CENTERED IN SLAB
EL. REF. LANDSCAPE
1 S5.03
2 S5.03
1 S5.03
2 S5.03
TYP.
1 S5.03 TYP.
2 S5.03 TYP.
12'-812" 12'-812"
TYP.
4 S5.03 TYP.
1 S5.03
TYP.
2 S5.03
20'-0" 8'-4"
12" THICK SLAB ON
GRADE w/ #4 @ 16" o.c.

TOP AND BOTTOM
EL. REF. LANDSCAPE
K:\2022\10022200377\DRAFTING\10022200377-S501.DWG
110 SE Main St., Suite 100
Portland, OR 97214
Ph: 503 222 5612
Fax: 503 222 2283
Email: [email protected]

LANDSCAPE ARCHITECTURE

ENVIRONMENTAL DESIGN

THESE DRAWINGS ARE THE PROPERTY OF
GREENWORKS, P.C., AND ARE NOT TO BE USED OR
REPRODUCED IN ANY MANNER, EXCEPT WITH THEPRIOR WRITTEN PERMISSION OF GREENWORKS, P.C.

GREENWORKS, P.C. © 2023, ALL RIGHTS RESERVED
Project:

VERIFY SCALE: DRAWINGS ARE TO
SCALE IF BAR MEASURES 1"
0" 1/2" 1"
Checked By:Job No.

Approved:

Drawn By:Sheet No. of
Date:Revisions:

Submittal:

Sheet Title: Crescent City
Beachfront Park
City of Crescent City
377 J STREET
CRESCENT CITY, CA, 95531
707-464-9506
[email protected]
30% CD
11/21/202310022200377
X
111 SW Fifth Ave., Suite 2600
Portland, OR 97204
O: 503.227.3251
F: 503.227.7980
www.kpff.com
SVSF##

CONCRETE DETAILS
S5.01
1

Page 6 of 15 ends

CAST FULLY COMPACTED

SUBGRADE
1"=1'-0" 1 ENTRY SIGN STRUCTURE

FINISH GRADE

FINISH GRADE
#4 TOP AND BOTTOM
BARS @ 16" o.c.

DRAIN REF. CIVIL
#4 VERTS @ 16" o.c.

EACH FACE
#4 HORIZONTALS
@ 16" o.c.

EACH FACE
5'-0" MAX. 2'-0" MIN.

TOP OF WALL
EL. REF. LANDSCAPE
2"
CLR.
2"
CLR.
1'-0"
2 1
1'-0"
7'-0"
1'-0"
3"
CLR.

TYP.
#4 LONGITUDINAL
@ 16" o.c.

FINISH GRADE
REF. LANDSCAPE
TYP.
#5 TRANSVERSE
@ 12" o.c.

TOP AND BOTTOM
5'-0" MAX. 1'-0"
2"
CLR.
2"
CLR.
8"
3'-0"
1'-0"
3"
CLR.

TYP.(3) #4 LONGITUDINAL
1"=1'-0" 2 FREE STANDING CONCRETE WALL
#4 VERTS @ 16" o.c.

EACH FACE INTOFOOTING
#4 HORIZONTALS
@ 16" o.c.

EACH FACE
K:\2022\10022200377\DRAFTING\10022200377-S502.DWG
110 SE Main St., Suite 100
Portland, OR 97214
Ph: 503 222 5612
Fax: 503 222 2283
Email: [email protected]

LANDSCAPE ARCHITECTURE

ENVIRONMENTAL DESIGN

THESE DRAWINGS ARE THE PROPERTY OF
GREENWORKS, P.C., AND ARE NOT TO BE USED OR
REPRODUCED IN ANY MANNER, EXCEPT WITH THEPRIOR WRITTEN PERMISSION OF GREENWORKS, P.C.

GREENWORKS, P.C. © 2023, ALL RIGHTS RESERVED
Project:

VERIFY SCALE: DRAWINGS ARE TO
SCALE IF BAR MEASURES 1"
0" 1/2" 1"
Checked By:Job No.

Approved:

Drawn By:Sheet No. of
Date:Revisions:

Submittal:

Sheet Title: Crescent City
Beachfront Park
City of Crescent City
377 J STREET
CRESCENT CITY, CA, 95531
707-464-9506
[email protected]
30% CD
11/21/202310022200377
X
111 SW Fifth Ave., Suite 2600
Portland, OR 97204
O: 503.227.3251
F: 503.227.7980
www.kpff.com
SVSF##

CONCRETE DETAILS
S5.02
2

Page 7 of 15 ends

Outdoor | Bollards | LIGHTSOFT
LIGHTSOFT 1 (LH-10665)
We reserve the right to make technical and design changes. 03:02, 26-09-2024
https://www.ligman.com/lightsoft-1-lh-10665/

THAILAND
LIGMAN Lighting Co.,Ltd.
17/2 Moo 4, Monthong, Bang Nam Priao,
24150 Chachoengsao - Thailand
[email protected]
Product description
Ø186 - 1000 mm - Round - IK10
Luminaire Structure
- Die-cast aluminium housing
- Extruded aluminium column
- Pre-treated before powder coating ensuring high
corrosion resistance
- Single cable entry
- One IP68 connector supplied with 0.2 m of 3x1.0
sqmm outdoor cable
- Stainless steel fasteners in grade 304 with zinc
flake coating (ZFC)
- Durable silicone rubber gasket
- Clear UV-stabilised polycarbonate diffuser
- Anodised, high-purity aluminium reflector
- Integral control gear
Optic
G
Product colour
01 - Black (RAL
9011)
02 - Dark Grey
(RAL 7043)
03 - White (RAL
9003)
05 - Matt Silver
(RAL 9006)
06 - Bronze (RAL
6014)
Special finishes upon request
SU01 - Concrete -
Urban
SU02 - Softscape -
Urban
SU03 - Stone -
Urban
SU04 - Corten -
Urban
SW01 - Oak -
Woodland
SW02 - Walnut -
Woodland
SW03 - Pine -
Woodland

Page 8 of 15 ends

Outdoor | Bollards | LIGHTSOFT
LIGHTSOFT 1 (LH-10665)
We reserve the right to make technical and design changes. 03:02, 26-09-2024
https://www.ligman.com/lightsoft-1-lh-10665/

THAILAND
LIGMAN Lighting Co.,Ltd.
17/2 Moo 4, Monthong, Bang Nam Priao,
24150 Chachoengsao - Thailand
[email protected]
Technical information
Material Aluminium
Light source 12 LED
Power 27 W
Lumen 1161 - 1188 lm
Efficacy 43 - 44 lm/W
Driver option Integral control gear
Driver Constant current (CC)
Input voltage 220-240 V 50/60 Hz
Optic G
Optic value 360°
CCT / CRI 3000K CRI80, 4000K CRI80
Bug B1-U3-G1
ULR 8%
ULOR 8%
CIE flux code nº3 75
Dimming type On/Off, 1-10V, DALI
Product colours
Black, Dark Grey, White, Matt
Silver, Bronze, Concrete -
Urban, Softscape - Urban,
Stone - Urban, Corten - Urban,
Oak - Woodland, Walnut -
Woodland, Pine - Woodland
Weight 7.7 kg
Operating
temperature -20 °C to 40 °C
Cable
One IP68 connector supplied
with 0.2 m of 3x1.0 sqmm
outdoor cable
Through wiring Single cable entry
Lens / Reflector /
Optic
Clear UV-stabilised
polycarbonate diffuser,
Anodised, high-purity
aluminium reflector
MacAdam Ellipse 3 SDCM
Lifetime L90B10
(hours) > 120,000
Lifetime L80B10
(hours) > 120,000
Lifetime L80B50
(hours) > 120,000
Variants (1-10V)
Compatible with EN/ IEC
60598-2-22: Suitable for
emergency installations as
central supply, nonmaintained (Z0)
Accessories
Anchor bolt
A10391
Light shield 180°
A10731
Light shield 90°
A10831
Power connection box (IP65)
modification upon request
POWER-BOX-IP65

Page 9 of 15 ends

G:\PROJECTS\220065.1_CRESCENT_CITY_BEACHFRONT_PARK\02_PRODUCTION\01_CAD\01_PLOT_SHEETS\220065_MATL.DWG 110 SE Main St., Suite 100
Portland, OR 97214
Ph: 503 222 5612
Fax: 503 222 2283
Email: [email protected]

LANDSCAPE ARCHITECTURE

ENVIRONMENTAL DESIGN

THESE DRAWINGS ARE THE PROPERTY OF
GREENWORKS, P.C., AND ARE NOT TO BE USED OR
REPRODUCED IN ANY MANNER, EXCEPT WITH THEPRIOR WRITTEN PERMISSION OF GREENWORKS, P.C.

GREENWORKS, P.C. © 2023, ALL RIGHTS RESERVED
Project:

VERIFY SCALE: DRAWINGS ARE TO
SCALE IF BAR MEASURES 1"
0" 1/2" 1"
Checked By:Job No.

Approved:

Drawn By:Sheet No. of
Date:Revisions:

Submittal:

Sheet Title: Crescent City
Beachfront Park
City of Crescent City
377 J STREET
CRESCENT CITY, CA, 95531
707-464-9506
[email protected]
60% CD
11/22/2023220065
X

PLAY STREET

STAMPS WAY

KEY MAP
Redwood Tree Renderings

DA/AM/JD/PGPA/BJPA
L4.09
41 PLAYGROUND REDWOOD TREE 2 DRAFT PERSPECTIVE PLAYGROUND REDWOOD TREE 1 DRAFT PERSPECTIVE

NOT TO SCALE
REDWOOD TREE 3 SECTION
11'-0" 6" 1'-0"
18'-0"

INTERNAL SURFACE OF TRUNKIS ALL NON-CLIMBING

PLAYCRAFT ADA RAMP
(S-1208-R5) W/ POST BASE

COVERED BY GFRC
NON-CLIMBING AREA MIN 86" FROMNEAREST CLIMBING OR DESIGNATED

PLAY SURFACE

GFRC SCULPTURE

W/ CLIMBING AREA
MAX CFH 11'

ENCLOSED
PLAY

COMPACTED

SUBGRADE
REINFORCED CONCFOOTING W/ #5 REBAR
12" OC 3" CLR ALL SIDES FS
1 LX.XX PIP RUBBER SAFETY SURFACING

Page 10 of 15 ends

G:\PROJECTS\220065.1_CRESCENT_CITY_BEACHFRONT_PARK\02_PRODUCTION\01_CAD\00_SUPPORTING_FILES\03_COORDINATION\02_SEAREACH_PLOT_FILE\2023_08_31_SEAREACH_30PCT.DWG 110 SE Main St., Suite 100
Portland, OR 97214
Ph: 503 222 5612
Fax: 503 222 2283
Email: [email protected]

LANDSCAPE ARCHITECTURE

ENVIRONMENTAL DESIGN

THESE DRAWINGS ARE THE PROPERTY OF
GREENWORKS, P.C., AND ARE NOT TO BE USED OR

REPRODUCED IN ANY MANNER, EXCEPT WITH THE
PRIOR WRITTEN PERMISSION OF GREENWORKS, P.C.

GREENWORKS, P.C. © 2023, ALL RIGHTS RESERVED
Project:

VERIFY SCALE: DRAWINGS ARE TO
SCALE IF BAR MEASURES 1"
0" 1/2" 1"
Checked By:Job No.

Approved:

Drawn By:Sheet No. of
Date:Revisions:

Submittal:

Sheet Title: Crescent City
Beachfront Park
City of Crescent City
377 J STREET
CRESCENT CITY, CA, 95531
707-464-9506
[email protected]
30% CD
11/22/2023220065
X

FRONT STREET

FRONT STREET

FRONT STREET
B ST
D ST
E ST
F ST
G ST
H ST
I ST
K ST
L ST
M ST

PLAY STREET

STAMPS WAY

HOWE DR
HWY 101
Interpretive Node-Canoe
MBPR##
I1.00
##

Page 11 of 15 ends

G:\PROJECTS\220065.1_CRESCENT_CITY_BEACHFRONT_PARK\02_PRODUCTION\01_CAD\00_SUPPORTING_FILES\03_COORDINATION\02_SEAREACH_PLOT_FILE\2023_08_31_SEAREACH_30PCT.DWG 110 SE Main St., Suite 100
Portland, OR 97214
Ph: 503 222 5612
Fax: 503 222 2283
Email: [email protected]

LANDSCAPE ARCHITECTURE

ENVIRONMENTAL DESIGN

THESE DRAWINGS ARE THE PROPERTY OF
GREENWORKS, P.C., AND ARE NOT TO BE USED OR

REPRODUCED IN ANY MANNER, EXCEPT WITH THE
PRIOR WRITTEN PERMISSION OF GREENWORKS, P.C.

GREENWORKS, P.C. © 2023, ALL RIGHTS RESERVED
Project:

VERIFY SCALE: DRAWINGS ARE TO
SCALE IF BAR MEASURES 1"
0" 1/2" 1"
Checked By:Job No.

Approved:

Drawn By:Sheet No. of
Date:Revisions:

Submittal:

Sheet Title: Crescent City
Beachfront Park
City of Crescent City
377 J STREET
CRESCENT CITY, CA, 95531
707-464-9506
[email protected]
30% CD
11/22/2023220065
X

FRONT STREET

FRONT STREET

FRONT STREET
B ST
D ST
E ST
F ST
G ST
H ST
I ST
K ST
L ST
M ST

PLAY STREET

STAMPS WAY

HOWE DR
HWY 101
Interpretive Node-Redwood
MBPR##
I1.01
##

Page 12 of 15 ends

G:\PROJECTS\220065.1_CRESCENT_CITY_BEACHFRONT_PARK\02_PRODUCTION\01_CAD\00_SUPPORTING_FILES\03_COORDINATION\02_SEAREACH_PLOT_FILE\2023_08_31_SEAREACH_30PCT.DWG 110 SE Main St., Suite 100
Portland, OR 97214
Ph: 503 222 5612
Fax: 503 222 2283
Email: [email protected]

LANDSCAPE ARCHITECTURE

ENVIRONMENTAL DESIGN

THESE DRAWINGS ARE THE PROPERTY OF
GREENWORKS, P.C., AND ARE NOT TO BE USED OR

REPRODUCED IN ANY MANNER, EXCEPT WITH THE
PRIOR WRITTEN PERMISSION OF GREENWORKS, P.C.

GREENWORKS, P.C. © 2023, ALL RIGHTS RESERVED
Project:

VERIFY SCALE: DRAWINGS ARE TO
SCALE IF BAR MEASURES 1"
0" 1/2" 1"
Checked By:Job No.

Approved:

Drawn By:Sheet No. of
Date:Revisions:

Submittal:

Sheet Title: Crescent City
Beachfront Park
City of Crescent City
377 J STREET
CRESCENT CITY, CA, 95531
707-464-9506
[email protected]
30% CD
11/22/2023220065
X

FRONT STREET

FRONT STREET

FRONT STREET
B ST
D ST
E ST
F ST
G ST
H ST
I ST
K ST
L ST
M ST

PLAY STREET

STAMPS WAY

HOWE DR
HWY 101
Interpretive Node-Basket
MBPR##
I1.03
##

Page 13 of 15 ends

G:\PROJECTS\220065.1_CRESCENT_CITY_BEACHFRONT_PARK\02_PRODUCTION\01_CAD\01_PLOT_SHEETS\220065_DETL.DWG 110 SE Main St., Suite 100
Portland, OR 97214
Ph: 503 222 5612
Fax: 503 222 2283
Email: [email protected]

LANDSCAPE ARCHITECTURE

ENVIRONMENTAL DESIGN

THESE DRAWINGS ARE THE PROPERTY OF
GREENWORKS, P.C., AND ARE NOT TO BE USED OR

REPRODUCED IN ANY MANNER, EXCEPT WITH THE
PRIOR WRITTEN PERMISSION OF GREENWORKS, P.C.

GREENWORKS, P.C. © 2023, ALL RIGHTS RESERVED
Project:

VERIFY SCALE: DRAWINGS ARE TO
SCALE IF BAR MEASURES 1"
0" 1/2" 1"
Checked By:Job No.

Approved:

Drawn By:Sheet No. of
Date:Revisions:

Submittal:

Sheet Title: Crescent City
Beachfront Park
City of Crescent City
377 J STREET
CRESCENT CITY, CA, 95531
707-464-9506
[email protected]
60% CD
11/22/2023220065
X
Details

DA/AM/JD/PGPA/BJPA
L9.09
85 KAMOME BOAT TOP 1 ELEVATION 0" 6" 12" 24" SCALE: 1/2" = 1'-0" KAMOME BOAT BOTTOM 2 ELEVATION 0" 6" 12" 24" SCALE: 1/2" = 1'-0" KAMOME BOAT SIDE 3 ELEVATION 0" 6" 12" 24" SCALE: 1/2" = 1'-0"KAMOME BOAT SIDE 4 SECTION 0" 6" 12" 24" SCALE: 1/2" = 1'-0" KAMOME BOAT MID-SECTION 5 SECTION 0" 6" 12" 24" SCALE: 1/2" = 1'-0" KAMOME BOAT STERN 6 ELEVATION 0" 6" 12" 24" SCALE: 1/2" = 1'-0" KAMOME BOAT BOW 7 ELEVATION 0" 6" 12" 24" SCALE: 1/2" = 1'-0"

BOW SEAT
4" WIDE GUNWALES4" WIDE THWARTS
4'-6"
5'-1 3/8"
15'-0"
3'-6"
4'-6"
15'-0"
3'-8 5/8"

STERN SEAT
4" WIDE GUNWALES
4" WIDE GUNWALES
13'-8"
13'-7 5/8"
13'-8"
2'-10"
1'-6"
R=1" TYP

STERN SEAT BOW SEAT
4" GUNWALE
6"
1'-13"
13'-8"
2'-10"
5 4" WIDE THWARTS
4" WIDE GUNWALES
4" WIDE GUNWALES
4"
1'-0"
11 1/4"
2'-0 3/4"

Page 14 of 15 ends

G:\PROJECTS\220065.1_CRESCENT_CITY_BEACHFRONT_PARK\02_PRODUCTION\01_CAD\01_PLOT_SHEETS\220065_DETL.DWG 110 SE Main St., Suite 100
Portland, OR 97214
Ph: 503 222 5612
Fax: 503 222 2283
Email: [email protected]

LANDSCAPE ARCHITECTURE

ENVIRONMENTAL DESIGN

THESE DRAWINGS ARE THE PROPERTY OF
GREENWORKS, P.C., AND ARE NOT TO BE USED OR

REPRODUCED IN ANY MANNER, EXCEPT WITH THE
PRIOR WRITTEN PERMISSION OF GREENWORKS, P.C.

GREENWORKS, P.C. © 2023, ALL RIGHTS RESERVED
Project:

VERIFY SCALE: DRAWINGS ARE TO
SCALE IF BAR MEASURES 1"
0" 1/2" 1"
Checked By:Job No.

Approved:

Drawn By:Sheet No. of
Date:Revisions:

Submittal:

Sheet Title: Crescent City
Beachfront Park
City of Crescent City
377 J STREET
CRESCENT CITY, CA, 95531
707-464-9506
[email protected]
60% CD
11/22/2023220065
X
Details

DA/AM/JD/PGPA/BJPA
L9.08
84 NOT TO SCALE
RESTROOM DETAILS 1 SECTION

Page 15 of 15 ends

BEACHFRONT PARK IMPROVEMENTS PROJECT
Coastal Development Permit Application
Supplemental Information
Final Prepared by:

City of Crescent City
377 J Street
Crescent City, CA 95531
Attn: Eric Wier
Submitted To:

California Coastal Commission
North Coast District Office
1385 Eighth Street, Suite 130
Arcata, CA 95521
Prepared with Assistance from:

March 2025

Page 1 of 16 ends

Table of Contents

1. Tolowa Paths of Culture, Amphitheater and Waterfront Plaza, and General Park Improvements ................................................................................................................................. 2

1.1. Tolowa Interpretive Trail and Interpretive Nodes ..................................................................... 2

1.2. Tolowa Botanical Garden .......................................................................................................... 2

1.3. Amphitheater ............................................................................................................................. 3

1.4. Waterfront Plaza ........................................................................................................................ 3

1.5. General Park Improvements ...................................................................................................... 3

1.5.1. Stamps Way Entry Signage ............................................................................................ 3

1.5.2. Universally Accessible Inclusive Play Area ................................................................... 3

1.5.3. Komome Plaza................................................................................................................ 4

1.5.4. Jogging/Walking Loop ................................................................................................... 4

1.5.5. New Restrooms .............................................................................................................. 4

1.5.6. Parking ............................................................................................................................ 4

1.5.7. Landscaping, Planting, and Irrigation ............................................................................. 5

1.5.8. Signage, Lighting, and Utilities ...................................................................................... 5

2. Cultural Center Entryway/Gateway Structures ................................................................... 6

3. Site Preparation Activities .................................................................................................. 6

3.1. Demolition ................................................................................................................................. 6

3.2. Site Preparation, Salvage, and Protection .................................................................................. 6

3.3. Earthwork .................................................................................................................................. 6

4. Project Implementation ....................................................................................................... 7

4.1. Summary of Land Disturbance .................................................................................................. 7

4.2. Staging and Access .................................................................................................................... 7

4.3. Water Use .................................................................................................................................. 7

4.4. Electrical Power Needs ............................................................................................................. 7

4.5. Materials and Spoils Management/Disposal ............................................................................. 8

5. Site Clean-up and Waste Disposal ...................................................................................... 8

5.1. Post Construction Site Condition .............................................................................................. 8

5.2. Stormwater Pollution Prevention Plan ...................................................................................... 8

5.3. Hazards and Hazardous Materials ............................................................................................. 8

5.4. Waste Management ................................................................................................................... 9

6. Traffic Management/Access ............................................................................................... 9

7. Workforce and Equipment .................................................................................................. 9

8. Construction Schedule ...................................................................................................... 10

9. Permits and Approvals ...................................................................................................... 10

10. Impact Avoidance and Minimization................................................................................ 10

10.1. Best Management Practices ..................................................................................................... 11

10.1.1. Staging (temporary): ..................................................................................................... 11

10.1.2. Erosion and Sediment Control (temporary): ................................................................ 11

10.1.3. Erosion and Sediment Control (permanent): ................................................................ 11

10.2. Vegetation ............................................................................................................................... 11

10.3. Visual Impacts ......................................................................................................................... 11

Page 2 of 16 ends

11. Coastal Access During Construction ................................................................................ 12

12. Sensitive Species ............................................................................................................... 12

12.3.1. Wolf’s Evening Primrose ............................................................................................. 12

12.3.2. Riparian Areas .............................................................................................................. 12

13. Coastal Hazards ................................................................................................................ 12

14. Water Quality .................................................................................................................... 13 Attachments
Attachment A: Figures
Attachment B: Proof of Legal Interest in the Property
Attachment C: Mailing List
Attachment D: CEQA Initial Study and Mitigated Negative Declaration Attachment E: Permits and Approvals
Attachment F: 60% Design Drawings
Attachment G: Public Access Plan Drawings

Page 3 of 16 ends

Introduction
This document contains supplemental information in support of the Coastal Development Permit application for renovations to occur at Beachfront Park, located in Crescent City, CA. The supplemental information provided herein follows the format of the fields of the Coastal Development Permit application and was prepared on behalf of the City of Crescent City (City).

List of Agents

1. Name: Matt Robart
Street Address: 680 G Street Suite C
City: Jacksonville
State: OR, Zip Code: 97530
Email: [email protected]
Daytime Phone Number, including Area Code: ( 541 ) 231-9392

2. Name: Bob Brown, Contract Community Development Director Street Address: 812 W Wabash
City: Eureka
State: CA, Zip Code: 95501
Email: [email protected]
Daytime Phone Number, including Area Code: (707 ) 441-8855

3. Name: Ethan Lawton, Contract City Planner
Street Address: 812 W Wabash
City: Eureka
State: CA, Zip Code: 95501
Email: [email protected]>
Daytime Phone Number, including Area Code: ( 707 ) 269-1073 Proposed Development
Describe the proposed development in detail. Include secondary improvements such as grading, septic tanks, water wells, roads, driveways, outbuildings, fences, etc.

The City of Crescent City is proposing improvements to Beachfront Park, a 35-acre waterfront community park and open space situated along Crescent City Harbor and southwest of Elk Creek (see Figures 1 and 2). The proposed development will implement some elements (as detailed in the IS/MND as Phases 1B, 1C) of the City’s Beachfront Park General Development Plan (City of Crescent City 2023) (“Project” or “Proposed Project”). Implementation of the General Development Plan is intended to activate underutilized portions of the park to better serve local residents and establish the park as a destination for the region, while conserving the park’s natural setting and maintaining or establishing visual connections with Crescent City Harbor and Elk Creek. The project is further described below.

Page 4 of 16 ends

1. Tolowa Paths of Culture, Amphitheater and Waterfront Plaza, and General Park Improvements

1.1.Tolowa Interpretive Trail and Interpretive Nodes
Currently, the California Coastal Trail traverses the eastern and southern perimeter of Beachfront Park and then routes north near Battery Point, just west of the Project site. The eastern portion of the Coastal Trail will be reconstructed to Stamps Way with the Tolowa Interpretative Trail, a dedicated multiuse path honoring the Tolowa indigenous people. Trail reconstruction will begin just south of the intersection of Front Street and K Street on the northeastern portion of the Project site and will run the eastern and southern perimeter of the park along Battery Street/Howe Drive until it meets B Street.

The trail will be constructed with vehicular concrete paving to allow access for maintenance vehicles and will conform to all national accessibility standards. The trail itself will be approximately 1,200 linear feet and typically 12 feet wide throughout. Three interpretive nodes will be installed along the trail to educate visitors about Tolowa culture and celebrate their history. These nodes will be in the form of a sculptural redwood tree, burden basket, and canoe, with interactive placards (QR codes) explaining their cultural significance to the Tolowa people.

Renderings of the nodes are included in Attachment A, Figure 5b. Visitors will be able to physically enter these contemplative spaces, which will be constructed of metal on concrete foundations. The approximate size of the nodes will vary, with the redwood tree at approximately 100 sf, the burden basket approximately 96 sf, and the canoe approximately 105 sf. Additionally, three smaller interpretive stations will be installed along the California Coastal Trail as it parallels Howe Drive. These stations will be solar powered and offer a place to rest while listening to the history of the Tolowa culture.

1.2.Tolowa Botanical Garden
The eastern portion of the Tolowa Botanical Garden will be situated in the northeast portion of the park, just south of the Del Norte County Visitor/Cultural Center along Elk Creek (immediately east of and accessible from the Interpretive Trail). The proposed area, currently consisting primarily of turf grass with coniferous trees will be landscaped with new plant beds, each containing native plant forbs, grasses, and shrubs that the Tolowa people traditionally used for medicinal, nutritional, and ceremonial purposes. A concrete walking path will bisect the garden, allowing entry/exit points from the Interpretive Trail. The garden will also include newly planted native tree species, including bay laurel, cascara buckthorn, Douglas fir, and Sitka spruce.

The western portion of the garden, to be located on the large lawn adjacent to the Del Norte County Visitor/Cultural Center, will be similarly planted with additional plant species and trees.

The landscape design of this portion of the garden has not been finalized since funding is currently not available. However, it is anticipated that construction of both the western and eastern portions planting areas will occur concurrently.

Page 5 of 16 ends

1.3.Amphitheater
A new outdoor amphitheater will be located immediately south of Play Street and west of the Fred Endert Municipal Pool parking lot. Elements include a concrete stage and foundation, which will accommodate temporary installations of lighting and sound, near the southeast corner of Stamps Way and Play Street. The height of the stage will not exceed 30 inches. The stage will also include a cover of the same design as is installed at Azalea Park in Brookings, Oregon (Attachment A, Figure 7). The stage cover will be retractable and locked in the closed position and will only be raised during events. Lawn seating in front of the central staging area will be accessible via new concrete paths, and will consist of an oval grassy area, approximately 23,500 square feet, and an adjacent 40,200 square foot topographic relief/berm, approximately 5-ft in height, which will provide additional seating on a grass surface. Fill for the berm will come from dredge spoils from the Crescent City Harbor District (tested and verified safe materials).

Together, these two features could accommodate about 2,000 people during concerts and events.

The amphitheater is depicted in design drawings L6.04 and L6.05 (Attachment F, pdf pages 44 and 45).

Stormwater from new impervious surfaces will be treated by rain gardens and filter strips sized to meet California stormwater quality standards.

1.4.Waterfront Plaza
The waterfront plaza (including the “boomerang” shape, farmers market hardscape area, and surrounding pathways for the food trucks to park), approximately 28,000 square feet, will be located immediately southwest of the amphitheater and east of the intersection of Stamps Way and Howe Drive, will include new paved surfacing and curbing, seatwalls, and turf lawn. The space will host regular farmers markets and will include five docking stations for food trucks.

Stormwater from new impervious surfaces will be treated by rain gardens and filter strips sized to meet California stormwater quality standards.

1.5.General Park Improvements

1.5.1. Stamps Way Entry Signage
The Project will include improvements to the park entrance at Stamps Way, at the intersection of Front Street and H Street. New elements will include new concrete walls at the southwest and southeast corners of Stamps Way and Front Street, new concrete paving, and new signage to direct pedestrians, bicyclists and motorists. New back lighting (max. 3000k) will be installed to illuminate the park entry signage and comply with dark sky requirements. Renderings of the entryway are included in Attachment A, Figure 5a.

1.5.2. Universally Accessible Inclusive Play Area
A new accessible and inclusive play area will be constructed adjacent to the existing Kid Town play area. This area will include soft, poured-in-place rubber surfacing, concrete paving along a semi-circular path, artificial turf, fencing, and picnic tables. New play equipment (e.g., swings, boat, tree, etc.), as well as a water play area (e.g., sand, water pump/channel, boulders, etc.) will also be installed. Materials used in the play area including artificial turf and pour-in-place rubber playground surfacing are depicted in design drawing L4.02 (Attachment F, pdf page 33).

Page 6 of 16 ends

1.5.3. Kamome Plaza
Adjacent to the new play area will be a new plaza featuring a replica of the boat that washed up in Crescent City from the Japanese city of Rikuzentakata in 2013, resulting from the Tohoku earthquake and tsunami that struck Japan two years earlier. The plaza includes the replica boat (which bears the name Kamome in Japanese, or seagull) and will be approximately 1,610 square feet and consist of concrete paving and seatwalls.

Stormwater from new impervious surfaces will be treated by rain gardens and filter strips sized to meet California stormwater quality standards.

1.5.4. Jogging/Walking Loop
A 1-mile paved loop will be installed along a portion of the park’s perimeter between Stamps Way and midway between D and B Streets. The paved 8-foot-wide loop will be intended for jogging and walking and will include two outdoor exercise equipment stations along the route.

1.5.5. New Restrooms
A new restroom facility is proposed to be installed at Kid Town. The 4-stall restroom building will be approximately 21 feet by 16 feet and will be made of precast concrete or concrete masonry units. The restroom will connect to a sewer main along Howe Drive via new subsurface sanitary lines. Restrooms will also include wall mounted luminaires for visibility and safety. A second 4-stall restroom will be added adjacent to the Pump Track pending future funding.

1.5.6. Parking
Currently, vehicle parking is available at two primary parking lots: a 19,000 square foot lot immediately west of Kid Town (approximately 41 spaces), and a 14,000 square foot lot south of the Fred Endert Municipal Pool building (approximately 25 spaces). There is also a small row of parking (approximately 6 spaces) just west of the Cultural Center accessed from Play Street.

Additionally, on-street parking exists throughout the Project area along Play Street, Stamps Way, Howe Drive, and along Front Street near the park entrances (a combined total of approximately 228 spaces).

Proposed improvements include removal of the small row of parking west of the Cultural Center (i.e., cutting off and capping the entrance), and the addition of a new bay of parking (approximately 9 spaces) to the south of the Fred Endert Municipal Pool (accessed via Play Street), for a total of 34 spaces and expanded lot size of approximately 17,000 square feet. That entire lot will also be resurfaced with a new asphalt seal. The parking lot west of Kid Town playground (accessed via Stamps Way) will not undergo any changes other than a new asphalt seal. New angled parking may also be added to the existing shoulder of Play Street once it becomes a unidirectional street, with ingress at Front Street and egress via Stamps Way or Howe Street. With these improvements, it is anticipated that the number of vehicle parking spaces will remain the same (or slightly above) as currently exist at the site (see Table 1).

Page 7 of 16 ends

Table 1: Beachfront Park Existing and Proposed Parking
Parking Location Existing
Spaces
Proposed
Phase 1
Proposed
Overall
Project*
Play Street (Street Parking) 40 27 27
Stamps Way (Street Parking) 46 46 66
Kidtown Parking Lot 41 41 41
Gravel Lot 10 0 0
Pool Parking Lot (North) 12 12 12
Pool Parking Lot (South) 25 34 34
Discovery Center Parking 7 7 23**
Howe Drive (Street Parking) 134 131 121
Howe Drive West (Street
Parking)
8 8 28
Totals 323 306 352
* Includes proposed parking from subsequent phases, based on General Development Plan ** Includes changes to Front Street associated with Discovery Center

1.5.7. Landscaping, Planting, and Irrigation
New landscaping and plantings will occur throughout the park, as discussed above for elements.

In general, improvements will include new plant beds and soil (approximately 4-inches in depth), bark mulch, planted berms, native shrubs and groundcovers, and native deciduous and coniferous trees (with minimum 12-inch-deep planting pits for trees). The proposed planting list and locations are included in design drawings L8.00 – L8.09 (Attachment F, pdf pages 58 – 67). A key feature will be berms/dune forms based on landforms at the Tolowa Dunes State Park that will be planted with American dunegrass (Leymus mollis) or meadow barley (Hordeum brachyantherum).

Filter strips and rain gardens will also be installed in areas where new paved surfacing will generate additional stormwater runoff. New irrigation lines will be installed for planting beds, lawn areas, botanical garden, and any new trees planted throughout the site. See below for additional details on erosion control and stormwater management during and post-construction.

1.5.8. Signage, Lighting, and Utilities
New signage will be placed throughout the site, including for traffic and parking, rules and wayfinding, and other informational signs as needed. In addition to the park entry and exterior restroom lighting discussed above, the Project will involve new bollard down-lighting (max 3000k, at hip level) to illuminate pathways around the amphitheater. Lighting details are included in design drawing E0.00 (Attachment F, pdf page 101) and in Attachment A, Figure 4.

No new overhead lighting will be added to the parking areas beyond what is currently there.

To address new electrical loads (e.g., lighting, needs for amphitheater and waterfront plaza), new pad mounted electrical cabinets will be placed on the northwest and northeast sides and southern portion of the Project site, respectively. Special purpose receptacles in lockable weatherproof enclosures will be mounted on above-grade pedestals for vendors and food trucks on the waterfront plaza and along the waterfront in concrete benches.

Page 8 of 16 ends

Additional subsurface utilities to be installed include new water and sewer lines, storm drains and inlets, electrical conduits and trenching, electrical utility transformers, a branch and secondary conduit system, and supporting appurtenances and infrastructure. The utilities are shown in design drawings C1.01 – C1.08 and E1.01 – E2.08 (Attachment F, pdf pages 86 – 92 and 102 – 117).

2. Cultural Center Entryway/Gateway Structures
As part of the gateway/entrance to Beachfront Park, a reconfiguration of the entry to the Del Norte County Cultural Center is being planned with a ground level entry to the building and a plaza replacing the current Porte Cochere. Two gateway features will be placed: one between L and M Streets, and one just west of K Street.

3. Site Preparation Activities

3.1.Demolition
Various existing park elements and furnishings will be removed, including elements comprising the existing park entrance, select paved areas, curbs, and chain link or wooden fencing throughout the site. The existing restroom at the Kid Town playground will be demolished.

Select furnishings such as aging picnic tables, benches and trash receptacles will also be recycled, reused or disposed of at a landfill. Finally, approximately 45 trees will be removed, consisting of Cypress and Pine species, and primarily located in the Amphitheater area. Design drawings L2.00 through L2.08 (Attachment F, pdf pages 14 – 22) show the locations for tree removals.

3.2.Site Preparation, Salvage, and Protection
Portions of the site to be altered will be cleared and grubbed in preparation for new park elements. A number of existing elements will be salvaged for reuse, including the existing site monuments. Trees to remain in place will be marked with protective fencing. All identified Wolf’s evening primrose will be clearly flagged and avoided (see also Section 12).

3.3.Earthwork
Excavation depths for project elements will range from approximately 2 to 4 feet. For placement of hardscape surfaces (e.g., walking paths, playground and parking areas) excavation will occur at a depth ranging from 0.5 to 1.5 feet, and 2 to 6 feet for structural elements (e.g., playground equipment, interpretive nodes, restroom, entry walls). Excavation for rain gardens and filter strips will occur at a depth of 2 to 4 feet. Additionally, new subsurface utilities associated with the Project will be excavated generally to 2 to 4 feet, with a maximum of 10 feet for a sewer line.

Elements such as the pump track, playground, walking paths and plaza areas will require grading and placement of imported fill, which will come from tested and approved dredging spoils from Crescent Harbor. This material will also be used to construct the berms near the amphitheater and potentially adjacent to the “S” curves on Highway 101.

Page 9 of 16 ends

4. Project Implementation

4.1.Summary of Land Disturbance
During construction, approximately 6 acres would be temporarily disturbed, and 6 acres would be permanently disturbed in Phase 1. This would include approximately 6 acres of temporary vegetation community loss and approximately 3 acres of permanent vegetation community loss in Phase 1.

4.2.Staging and Access
Access to the Project site will remain at the existing entrances at Stamps Way and Play Street, as well as at Battery Street via B Street. During construction of the Stamps Way entrance, the Play Street and Battery Street access points will remain open. Play Street may be temporarily closed during installation of the new play area, parking lot improvements, and/or Tolowa Garden; however, construction phasing will occur in such a way that access via Stamps Way will be open. Public access during construction is further described in the drawings included as Attachment G.

The Project includes two staging areas. Proposed staging areas are included in Attachment A, Figure 3. Staging will include the following elements:
• Office trailer(s)
• Storage containers for equipment/hazardous materials
• Lay-down areas for materials
• Worker parking areas
• Portable restrooms
• Safety fencing
• Security lighting

4.3.Water Use
The estimated water demand during Project construction will be approximately 50,000 gallons over 13 months. Water will primarily be used for dust control, increasing soil moisture content, and irrigation needs for revegetation and/or erosion control. During construction, watering will occur intermittently as required by park elements. Demand is expected to increase during installation of the Tolowa Garden, and other project elements requiring new vegetation and/or grasses. During operation, vegetation will be irrigated via new PVC lines connected to service lines. Water efficient sprinklers would be installed and automated for water conservation. It is expected that water usage would decrease from the existing usage as lawn areas would be reduced, planting areas would include less water demand, and some of the irrigation systems would change to more efficient drip irrigation for the plantings.

4.4.Electrical Power Needs
Construction equipment, trailers, and security lighting and will require electrical power for operation. It is anticipated that power needed during construction will be provided from adjacent power lines in the park. During operation, demand for power will be limited to bollard,

Page 10 of 16 ends

entryway and restroom lighting, as well as any digital components for the interpretive nodes.

Power will also be utilized for food trucks (via docking stations) and for concerts held at the amphitheater. The City anticipates that the park will host approximately 10 – 15 concerts per year, primarily in the summer.

4.5.Materials and Spoils Management/Disposal
Construction materials will include a mix of concrete, asphalt, rock, engineered fill, dredge spoils and topsoil. Approximately 400 delivery truck trips will be required to deliver materials.

Approximate quantities are listed in Table 2 below. Fill material generated from construction of pathways, pump track, playground and plaza areas will be reused onsite to the extent possible.

Table 2: Imported Materials and Quantities
Import Material Estimated Quantity
Engineered Fill 400 Cubic Yards
Dredge Spoils 7,500 Cubic Yards
Concrete 1,500 Cubic Yards
Rock 1,800 Cubic Yards
Topsoil 2,600 Cubic Yards
Raingarden Soil Blend 300 Cubic Yards

5. Site Clean-up and Waste Disposal

5.1.Post Construction Site Condition
Upon completion of construction activities, the contractor will repave all damaged surfaces, replace any damaged park furnishings (e.g., fencing, etc.), restore vegetation, and remove all construction materials from the site.

All disturbed areas will be revegetated, and any newly graded, unpaved surfaces will be replanted with native plants per specific planting plans for the Tolowa Garden, Playground, and Waterfront Plaza. Planting diagrams are depicted in design drawings L8.00 – L8.09 (see Attachment F, pdf pages 58 – 67).

5.2.Stormwater Pollution Prevention Plan
Because the Project will involve disturbance greater than 1 acre, the City is required to obtain coverage under the State Water Resources Control Board (SWRCB) Construction Storm Water General Permit and develop a Stormwater Pollution Prevention Plan (SWPPP). The City’s construction contractor will implement the SWPPP during Project construction, which will include periodic inspections and monitoring, and installation of Best Management Practices (BMPs) to prevent pollutants, sediment, and dust from entering Elk Creek, Crescent City Harbor, and the City’s storm sewer system.

5.3.Hazards and Hazardous Materials
Hazardous materials anticipated to be used during construction include:

Page 11 of 16 ends

• Diesel fuel
• Lubricating grease
• Gasoline
• Herbicides (as needed)
• Pesticides (as needed)
All hazardous materials will be stored in designated locations away from any potentially sensitive areas (e.g., drainage areas, Elk Creek, playground) in accordance with state and local laws. Storage tanks over 55 gallons will require secondary containment. Any herbicides or pesticides for revegetation or pest management will be stored and applied in accordance with applicable local, state and/or federal requirements.

5.4.Waste Management
Any materials that cannot be reused onsite (e.g., fill material) or recycled will be disposed of at a licensed disposal facility. Asphalt and concrete will be recycled by Tidewater Contractors in Crescent City. During operation, the collection of solid waste and recycling will be provided by Recology Del Norte through the Del Norte Solid Waste Management Authority.

6. Traffic Management/Access
Equipment and materials will be delivered to the site via the entrances at Stamps Way and/or Play Street via Front Street and Highway 101. Standard traffic control measures will be implemented in accordance with City requirements during construction to avoid interference with traffic flow along Front Street. Such measures could include scheduling major truck trips and deliveries to avoid peak traffic hours, posting warning and detour signs for motorists, setting up temporary lane closure procedures, and placing cones to alert drivers.

During construction, most of the park west of Stamps Way will be accessible to visitors, and ingress/egress will be maintained along Howe Drive. Construction will be phased to result in the least disturbance possible for park visitors. Public access during construction is further described in the drawings included as Attachment G.

7. Workforce and Equipment
• During construction, it is anticipated that a maximum of 20 workers would be onsite throughout construction, and that approximately 950 haul trips would be necessary to deliver/remove materials (per Section 3.9.5 above) and/or bring equipment onsite. The type of equipment that would be required to implement the Proposed Project is anticipated to include:
 Dozer
 Excavator
 Front-end Loader
 Dump Trucks
 Vibratory Roller
 Graders
 Asphalt Paver
 Water Truck

Page 12 of 16 ends

8. Construction Schedule
Construction of the Proposed Project will last approximately 18 months and is anticipated to begin in March 2025 and be complete by October 2026. Table 3 includes construction sequencing and duration of activity; however, timelines are preliminary and will be finalized by the construction contractor and the City.

Construction will generally occur between the hours of 7:00 a.m. and 5:00 p.m., Monday through Saturday, per the City of Crescent City’s noise ordinance.

Table 3: Construction Phasing

9. Permits and Approvals
Documentation of environmental review under the California Environmental Quality Act (CEQA) is included in Attachment D and verifications of all other permits and approvals are included in Attachment E.

10.Impact Avoidance and Minimization
The City intends to avoid or minimize environmental impacts throughout construction and operation of the Proposed Project through the implementation of standard best management practices (BMPs), many of which will be described in the SWPPP. These measures will avoid and minimize adverse effects on people and the environment by adjusting work windows to Construction Phase and Activity Estimated Duration Timeline Phase 1A – Pump Track Completed
8/2024
Phase 1A – Trail Construction Completed
2/2025
Phase 1B – Site and Equipment Mobilization 1 month April 2026 Phase 1B – Demo 2 month May - June 2026
Phase 1B – Grading & Utilities 4 months July – Oct 2026 Phase 1B – Concrete and Paving 4 months Aug 26 – Nov 26 Phase 1B – Playground, Interpretive & Planting 3 months Aug – Oct 26 Phase 1B – Punch List, Clean up, Demobilization 1 month Dec 2026 Phase 1C – Site and Equipment Mobilization 1 month June 2025 Phase 1C – Demo 1 month August 2025
Phase 1C – Grading & Utilities 2 months Aug – Oct 2025
Phase 1B & 1C – Concrete for all walkways and Tolowa
Cultural Trail
2 months Oct 2025-Mar
2026
Phase 1B & 1C – Interpretive & Planting@ Cultural
Center and Tolowa Cultural Trail and Nodes
2 months Sept 2025

Page 13 of 16 ends

avoid sensitive species, providing staff training, and implementing various protocols throughout during and post-construction.

10.1. Best Management Practices

10.1.1. Staging (temporary):

10.1.2. Erosion and Sediment Control (temporary):

During active construction, the City will surround the ground disturbance area with silt fence.

10.1.3. Erosion and Sediment Control (permanent):

Stormwater runoff from the impervious asphalt will be directed into a series of vegetated drainage swales, each with a French drain. The French drains will be lined with geotextile filter fabric and backfilled with gravel. The drainage system will be designed so that there will be no direct surface runoff to any open waterways.

10.2. Vegetation
All disturbed ground within Beachfront Park will be revegetated with plants suitable for environmental and soil conditions on the northern California coast. As designated on drawings, some areas will receive native vegetation treatment. Other areas will have plantings/seeding appropriate for sports fields, erosion control or park landscaping. Finally, approximately 45 trees would be removed, consisting of landscaped Cypress and Pine species, and primarily located in the Amphitheater area. Design drawings L2.00 through L2.08 (Attachment F, pdf pages 14 – 22) show the locations for landscaped tree removals.

10.3. Visual Impacts
Visual impacts are less than significant. Beachfront Park is visible from Front Street. Raised features within the park will be no more than 6 feet above the existing ground surface, which will not impair the ability to view the Crescent City Harbor from Front Street.

The Project will both enhance existing park features and construct new amenities that will improve the quality of the park for residents and visitors alike. Existing beach access points will not be modified or removed while various recreation areas (Phase 1A and 1B elements) will be developed or updated, including the constructed Pump Track, new pathways connecting adjacent streets, small plazas, an amphitheater, waterfront plaza for farmers markets and Tolowa Interpretive Trail, expansion of the children's play area with inclusive play features, and completion of a 1-mile running/walking loop. Other features include a new entryway and signage, two new restrooms, landscape improvements, various site furnishings (e.g., benches, bike racks, signage, etc.), parking lot upgrades, limited new lighting, and various subsurface utilities, as depicted in Figure 3d. Park redevelopment will also enhance the California Coastal Trail by incorporating stories of the Tolowa people using three interpretive nodes along the portion of the trail running parallel to Elk Creek. An additional three temporary interpretive stations will be placed along Howe Drive. The Project also includes removal of a number of landscaped Cypress and Pine trees. With the proposed upgrades, views of the park setting will be enhanced and views of the harbor will increase from tree removal, trail improvements and the elevated berm placed as part of the amphitheater. Throughout the Beachfront Park views will generally remain the same as they currently exist.

Page 14 of 16 ends

11.Coastal Access During Construction
The sidewalk along the south side of Front Street may be inaccessible during active construction.

The City will place signage directing pedestrians to alternative routes to access Beachfront Park and Battery Point. Public Access Plan drawings are included as Attachment G, showing access routes and parking availability during construction in years 2025 and 2026.

12.Sensitive Species

12.3.1. Wolf’s Evening Primrose
Wolf’s evening primrose (Oenothera wolfii) has been identified by the California Native Plant Society as a rare species. This species is known to occur within Beachfront Park, but the August 2023 survey (see Attachment A, Figure 6) showed that there was only one individual within the footprint of the proposed park renovations, and it will be protected in place. This individual was non-flowering, and non-flowering individuals of pure Wolf’s evening primrose cannot be visually distinguished from hybrid individuals that have crossed with the closely related garden escapee Oenothera glazioviana. All non-flowering individuals will be considered native species until they flower. Non-native individuals may be removed when positively identified by a qualified biologist after flowering.

Wolf’s evening primrose plants within 100 feet of project construction will be fenced off to prevent trampling by construction workers or equipment, and erosion control devices will be placed between the road construction work and the Wolf’s evening primrose individuals to prevent sediment and other materials generated by construction from coming into contact with the rare plant habitat.

12.3.2. Riparian Areas
The riparian area of the inlet of Elk Creek is identified by the United States Fish and Wildlife Service, National Wetlands Inventory, as a “Estuarine and Marine Wetland” with the classification code “M2US2N” which classifies the area as “Marine, Intertidal, Unconsolidated Shore, Sand, and Regularly Flooded.” The USGS National Hydrography Dataset, identifies Elk Creek as a Lake/Pond waterbody. No removal or fill is planned within Elk Creek or its riparian area, however the Project construction activities will include state and federally required stormwater and erosion controls to protect against contamination to the Pacific Ocean and Elk Creek. Minor disturbance adjacent to and west of the Elk Creek riparian area is expected during the construction of the proposed overlook point, including minor grading, and anchoring of the cantilevered overlook platform, however impacts are not expected to the riparian area.

All Ecologically Sensitive Habitat Areas (ESHAs) within the limits of work will be protected in place from any ground disturbance or tree cutting. Tree cutting will only occur as specified

13.Coastal Hazards
Renovations at Beachfront Park will not increase any risk to coastal hazards such as coastal erosion or tsunami risk. The already developed park is adjacent to Crescent City Harbor and does not propose improvements that exacerbate coastal hazards.

Page 15 of 16 ends

14.Water Quality
The proposed Project will not introduce any materials or substances, nor modify a natural condition that will cause either a temporary or lasting effect on existing conditions for the following water quality standards: color, taste or odor, floating material, suspended material, settleable material, biostimulatory substance, pH, dissolved oxygen, bacteria, temperature, toxicity, pesticides, chemical constituents, or radioactivity. Project construction activities that include vegetation removal, excavating and grading, and the use of heavy equipment have the potential to temporarily impact the following water quality standards: diesel and gasoline fuels, grease, oil, sediment, and turbidity. As required by the state and federal government, an erosion and sediment control plan will be implemented to reduce and control risks to water quality from the Project. Construction activities will be minimized to the extent feasible to prevent excessive siltation and sedimentation as required by California State Water Control Board and the USEPA.

Any permitted construction activities that extend into the rainy season will be suspended during heavy precipitation or when heavy precipitation is forecasted.

Page 16 of 16 ends

Appendix F: Beachfront Park Improvements Project IS/MND: Mitigation Monitoring and Reporting Plan Impacts Being Mitigated Mitigation Measure Responsible for Implementation Responsible for Monitoring and/or Enforcement Timing of Implementation Applicable Location Air Qualityb) Result in a cumulatively
considerable net increase of any criteria pollutant for which the project region is non-attainment under an applicable federal or state ambient air quality standard? Mitigation Measure AQ-1To reduce potential impacts from fugitive dust generation during construction activity, the construction contractor will employ the following dust control measures:
x Apply water to active construction areas to minimize fugitive dust.x Cover trucks hauling soil, sand, and other loose material. x Apply water on unpaved access roads and parking areas utilized for Project construction.x Sweep paved access roads and parking areas and sweep streets if visible material is carried onto adjacent public streets.
x Hydroseed or apply erosion control as appropriate for inactive construction areas.x Enclose, cover, or water to open materials stockpiles.x Limit traffic speeds to 15 mph on unpaved access roads. x Install erosion control measures to prevent silt runoff onto public roadways. x Seed or replant appropriate vegetation in disturbed areas within 30 days after project completion.

City of Crescent City
to include
requirements in bid
documents and
monitor throughout
construction
activities
City of Crescent City
Public Works Dept.

Before the release of bid documents and during construction activities All construction areas
c) Expose sensitive receptors
to substantial pollutant concentrations?
Mitigation Measure AQ-1 (see description above)
Biological Resources
a) Have a substantial adverse
impact, either directly or through habitat modifications on any species identified as a candidate, sensitive, or special-status species in local or regional plans, policies, or regulations or by the California Dept. of Fish & Wildlife or U.S. Fish & Wildlife Service? Mitigation Measure BIO-1 The Project will follow Local Coastal Plan policy 6.B.6 for the protection of Environmentally Sensitive Habitat Areas (ESHAs).

Prior to Project implementation, any ground disturbing activities or staging of equipment, riparian areas will receive a 100- foot protection buffer and be fenced off to prevent disturbance, where feasible. All areas containing Wolf’s evening primrose will be protected by a 100-foot buffer and fenced off to prevent trampling or disturbance. For areas within the 100-foot buffer that require construction actions, the qualified biologist will recommend additional protective measures or monitoring in coordination with CDFW.In addition, to preserve any potential existing Wolf’s evening-primrose seedbank in the Project area, the construction contractor will scrape the topsoil from areas of ground disturbance with potential to contain seeds and place the topsoil in areas identified for their suitability as potential habitat (i.e., well-drained, sandy soils). The qualified biologist, in coordination with CDFW, will determine the areas of topsoil to be relocated, if any.

City of Crescent City
to include
requirements in bid
documents and
monitor throughout
construction
activities
City of Crescent City
Public Works Dept.

Before the release of bid documents and during construction activities All construction areas and specifically project elementswithin 100 feet of ESHAs, waterbodies and/or identified Wolf’s evening primrose Mitigation Measure BIO-2To prevent any sediment from Project construction activities from impacting rare plant and riparian Environmentally SensitiveHabitat Areas (ESHAs), the Project’s construction contractor will implement best management practices (BMPs) for controlling stormwater runoff and maintaining water quality, including the development of a Storm Water Pollution Prevention Plan (SWPPP), as required under the under the NPDES permit for Discharges of Storm Water Runoff Associated with Construction Activity (Order No. 2009-009-DWQ) for ground disturbing activities on sites greater than one acre. The SWPPP will meet all requirements set forth in the Crescent City Local Coastal Plan, in addition to all federal and state requirements. This will include erosion control measures to prevent sediment from migrating off-site through installation of sediment controls such as fiber rolls, silt fences or sediment basins, establishing effective perimeter controls and stabilizing construction entrances/exits to City of Crescent City
to include
requirements in bid
documents and
monitor throughout
construction
activities
City of Crescent City
Public Works Dept.

Before the release of bid documents and during construction activities All construction areas

Page 1 of 6 ends

Impacts Being Mitigated Mitigation Measure Responsible for Implementation Responsible for Monitoring and/or Enforcement Timing of Implementation Applicable Location control sediment discharges, and stabilizing exposed soils within the work area immediately after completion of earthmoving activities. See also Mitigation Measure HAZ-1 and WATER-1 for additional BMPs that would be implemented as part of a SWPPP.Mitigation Measure BIO-3To protect Elk Creek wetlands from general ground disturbance, staging areas will be established upland to the extent possible,on paved or graveled areas or ruderal habitat. For work occurring adjacent to Elk Creek wetlands, limits of work will be clearlymarked with exclusionary fencing, and silt fences may be installed as needed. Stockpiled soils will be located away from ElkCreek wetlands (by at least 100 feet) and straw wattle (or similar material) will be placed around the stockpile until disposed. Additionally, any activities that increase the potential for erosion shall be restricted to the relatively dryer summer months and early fall period, to the maximum extent practicable, to avoid or minimize sediment transport during rain events to sensitive areas, including Wolf’s evening primrose habitat and Elk Creek and surrounding wetlands.For construction activities that must take place during the late-fall, winter, or spring, particularly those within 100-feet ofWolf’s evening primrose habitat or Elk Creek and surrounding wetland areas, temporary erosion and sediment control structures shall be in place and operational at the end of each construction day and maintained until permanent erosion control structures are in place. Exclusionary fencing will be installed around environmentally sensitive areas and other areas that do not need to be disturbed.Within 10 days of completion of construction, in those areas where subsequent ground disturbance will not occur for 10 calendar days or more, weed-free mulch shall be applied to disturbed areas to reduce the potential for short-term erosion.

Finally, the City of Crescent City will conduct regular inspections to ensure construction stays within the limits of work. Insuch cases where construction activity may exceed project limits, the City will work in consultation with CDFW and/or USFWS to immediately restore any sensitive habitat outside the limits of work.

City of Crescent City
to include
requirements in bid
documents and
monitor throughout
construction
activities
City of Crescent City
Public Works Dept.

Before the release of bid documents and during construction activities Project elements adjacent to Elk Creek and/or within 100 feet of identified Wolf’s evening primrose b) Have a substantial adverse
effect on any riparian habitat or other sensitive natural community identified in local or regional plans, policies, regulations or by the California Department of Fish and Wildlife or U.S. Fish and Wildlife Service? Mitigation Measure BIO-1 (see description above)
Mitigation Measure BIO-2 (see description above)Mitigation Measure BIO-3 (see description above) c) Have a substantial adverse
effect on state or federally protected wetlands (including, but not limited to, marsh, vernal pool, coastal, etc.) through direct removal, filling, hydrological interruption, or other means? Mitigation Measure BIO-3 (see description above)
d) Interfere substantially with
the movement of any native resident or migratory fish or wildlife species or with Mitigation Measure BIO-3 (see description above)

Page 2 of 6 ends

Impacts Being Mitigated Mitigation Measure Responsible for Implementation Responsible for Monitoring and/or Enforcement Timing of Implementation Applicable Location established native resident or migratory wildlife corridors, or impede the use of native wildlife nursery sites? e) Conflict with any local
policies or ordinances protecting biological resources, such as a tree preservation policy or ordinance? Mitigation Measure BIO-4Where a landmark tree is proposed for removal by the public agency which owns it, replacement shall be provided as follows:
a) When removed because it is found that the landmark tree is a hazard or is dying, one tree of the same species shall be planted in the same vicinity as the removed tree within thirty days of the removal. b) When removed for the purpose of establishment, expansion or maintenance of a public facility, two trees of the same species shall be planted in the same vicinity as the removed tree within thirty days of completion of construction.

City of Crescent Cityto include requirements in bid documents and monitor throughout construction activities City of Crescent City
Public Works Dept.

Before the release of bid documents and during construction activities Areas will tree removal will occur
Cultural Resources
a), b) Cause a substantial adverse change in the significance of a unique historical and/or archaeological resource pursuant to Section 15064.5? Mitigation Measure CULT-1At least 72 hours in advance of any ground disturbing activities or excavation, the City shall contact the THPO for the Tolowa Dee-ni’ Nation to facilitate access for Tribal staff monitoring of such ground disturbing activities or excavation at the Project site.

City of Crescent City
to include
requirements in bid
documents and
monitor throughout
construction
activities
City of Crescent City
Public Works Dept.

Tolowa Dee-ni’
Nation THPO
Before the release of bid documents and during construction activities All construction areas
Mitigation Measure CULT-2Ground disturbing construction activities to implement the Project have the potential to inadvertently uncover subsurface archaeological material or human remains. If materials or remains are unearthed during Project construction, the following mitigation measures would reduce the impact on cultural resources to a less-than-significant level by assuring proper protocols are in place for inadvertent discovery of potential cultural resources disturbed during construction.

Inadvertent Discovery of Archaeological MaterialIf cultural materials (for example: chipped or ground stone, historic debris, building foundations, or bone) are discovered during ground-disturbance activities, work shall be stopped within 20 meters (66 feet) of the discovery, per the requirements of CEQA (Title 14 CCR 15064.5 (f)). Crescent City representatives shall be immediately notified and work near the archaeological finds shall not resume until a professional archaeologist, who meets the Secretary of the Interior’s Standards and Guidelines, has evaluated the materials and offered recommendations for further action.Inadvertent Discovery of Human Remains
If human remains are discovered during project construction, work will stop at the discovery location, within 20 meters (66 feet), and any nearby area reasonably suspected to overlie adjacent to human remains (PRC, Section 7050.5). The Del Norte County Coroner shall be immediately notified. If the coroner determines that the remains are of Native American origin, it is necessary to comply with state laws relating to the disposition of Native American burials, which fall within the jurisdiction of the NAHC (PRC, Section 5097). The coroner will contact the NAHC. The descendants or most likely descendants of the deceased will be contacted, and work will not resume until they have made a recommendation to the landowner or the person responsible for the excavation work for means of treatment and disposition, of the human remains and any associated grave items, as provided in PRC, Section 5097.98.

City of Crescent City
to include
requirements in bid
documents and
monitor throughout
construction
activities
City of Crescent City
Public Works Dept.

Del Norte County
Coroner, NAHC
Before the release of bid documents and during construction activities All construction areas

Page 3 of 6 ends

Impacts Being Mitigated Mitigation Measure Responsible for Implementation Responsible for Monitoring and/or Enforcement Timing of Implementation Applicable Location a) Disturb any human remains,
including those interred outside of formal cemeteries?
Mitigation Measure CULT-1 (see description above)
Mitigation Measure CULT-2 (see description above)
Geology and Soils
f) Directly or indirectly destroy
a unique paleontological resource or site or unique geologic feature? Mitigation Measure CULT-1 (see description above)
Mitigation Measure CULT-2 (see description above)
Hazards and Hazardous Materials
a) Create a significant hazard
to the public or the environment through the routine transport, use, or disposal of hazardous materials? Mitigation Measure HAZ-1Proper equipment maintenance and fueling procedures will be implemented to ensure that no fluids are discharged into streams, water bodies, wetlands or drainage facilities, and that any spills are promptly cleaned up, documented, and reported (if necessary). A separate area will be designated for equipment maintenance and fueling, at least 150 feet or more from any stream, water body, or wetland, as feasible. Cleanup materials and tools will be kept nearby and available for immediate use and equipment will not be stored in areas that will potentially drain to watercourses. If this is not feasible, drip pans, berms, sandbags, or absorbent booms should be employed to contain any leaks or spills. No vehicle or equipment cleaning will be done on-site.

City of Crescent City
to include
requirements in bid
documents and
monitor throughout
construction
activities
City of Crescent City
Public Works Dept.

Before the release of
bid documents and
during construction
activities
All construction areas
Mitigation Measure HAZ-2The construction Contractor will develop a Spill Prevention and Response Plan. Equipment and materials for cleanup will be available on site, and spills and leaks will be cleaned up immediately and disposed of according to guidelines stated in the Spill Prevention and Response Plan. Spill response kits will always be in close proximity when using hazardous materials (e.g., at crew trucks and other logical locations). Absorbent materials will be maintained at the Project site in sufficient quantity to effectively immobilize the volume of petroleum-based fluids contained in the largest tank present at the site. For spills on impervious surfaces, absorbent materials will be used to remove the spill. For spills on pervious surfaces such as soil, the spill will be excavated and properly disposed of rather than buried. Absorbent materials will be collected and disposed of properly and promptly. Petroleum products and contaminated soil will be disposed of according to Federal, State, and local regulations.

City of Crescent City
to include
requirements in bid
documents and
monitor throughout
construction
activities
City of Crescent City
Public Works Dept.

Before the release of
bid documents and
during construction
activities
All construction areas
Mitigation Measure HAZ-3All hazardous materials and hazardous wastes (such as pesticides, paints, solvents, fuel, and oil) will be labeled in accordance with city, state, and federal regulations. Storage tanks over 55 gallons or more would require secondary containment. Any hazardous materials and waste will be stored in watertight containers and manufacturer’s application instructions for hazardous materials followed, and no chemicals will be applied outdoors when rain is forecast within 24 hours. Public notification of the use of any such materials (e.g., herbicide or pesticide use) will be posted via signage.

City of Crescent City
to include
requirements in bid
documents and
monitor throughout
construction
activities
City of Crescent City
Public Works Dept.

Before the release of
bid documents and
during construction
activities
All construction areas
b) Create a significant hazard
to the public or the environment through reasonably foreseeable upset and accident conditions involving the likely release of hazardous Mitigation Measure HAZ-1 (see description above)
Mitigation Measure HAZ-2 (see description above)

Page 4 of 6 ends

Impacts Being Mitigated Mitigation Measure Responsible for Implementation Responsible for Monitoring and/or Enforcement Timing of Implementation Applicable Location materials into the environment?
Hydrology and Water Quality
a) Violate any water quality
standards or waste discharge requirements or otherwise substantially degrade surface or ground water quality? Mitigation Measure WATER-11
Storm drain inlets and drainage courses will be protected with appropriate BMPs, such as gravel bags, fiber rolls, berms, etc. Off-site sediment migration will be avoided by installing and maintaining sediment controls, such as fiber rolls, silt fences, or sediment basins. Erosion control fabrics will with plastic monofilament netting, which can ensnare wildlife will be prohibited,and will consist of loose-weave mesh made of biodegradable fibers, such as jute, coconut, or hemp, unless otherwise authorized by CDFW. Suitable BMPs shall be placed below all construction activities at the edge of surface water features to intercept sediment before it reaches surface waters. These structures shall be installed prior to any clearing or grading activities. Further, sediment built up at the base of BMPs will be removed before BMP removal to avoid any accumulated sediments from being mobilized post-construction. During transport, haul trucks will be covered carrying soil, sand, or other loose materials off-site. Effective perimeter controls will be maintained and construction entrances and exits stabilized to control erosion and sediment discharges from the construction work areas including staging areas. Street tracking will be swept or vacuumed, and all exposed soils within work areas will be stabilized immediately following the completion of earthmoving activities to prevent erosion into adjacent wetlands and channels. When rain is forecasted or at the onset of unanticipated precipitation, Project personnel will implement erosion and sediment control measures.

City of Crescent City
to include
requirements in bid
documents and
monitor throughout
construction
activities
City of Crescent City
Public Works Dept.

Before the release of
bid documents and
during construction
activities
All construction areas
Mitigation Measure HAZ-1 (see description above)Mitigation Measure HAZ-2 (see description above)Mitigation Measure HAZ-3 (see description above)Mitigation Measure BIO-1 (see description above)Mitigation Measure BIO-2 (see description above) Tribal Cultural Resources
a) Cause a substantial adverse
change in the significance of
a tribal cultural resource listed or eligible for listing in the California Register of Historic Resources, or in a local register of historic resources as defined in Public Resources Code section 5020.1(k)? Mitigation Measure CULT-1 (see description above)Mitigation Measure CULT-2 (see description above) b) Cause a substantial adverse
change in the significance of a tribal cultural resource that is a resource determined by the lead agency, in its discretion and supported by substantial Mitigation Measure CULT-1 (see description above)Mitigation Measure CULT-2 (see description above) 1 See also list of California Stormwater BMPs that are typically included in City of Crescent City construction projects, attached.

Page 5 of 6 ends

Impacts Being Mitigated Mitigation Measure Responsible for Implementation Responsible for Monitoring and/or Enforcement Timing of Implementation Applicable Location evidence, to be significant pursuant to the criteria set forth in subdivision (c) of the Public Resources Code section 5024.1? In applying the criteria set forth in subdivision (c) of the Public Resources Code section 5024.1, the lead agency shall consider the significance of the resource to a California Native American Tribe.

Page 6 of 6 ends
Page 1 of 2 ends

City of Crescent City - 2025 Public Access Plan
= MAIN DETOUR ROUTE
= ROADS TO REMAIN OPEN
= ROAD CLOSURE DUE TO CONSTRUCTION
= BARRICADES/CLOSURE
= TRAIL CLOSED
= TRAIL TO REMAIN OPEN
P0 P1
P2
P3
P4
CITY PARKING LOTS:P0 - DOWNTOWN, PARKP1 - NATIONAL/STATE PARKS, LIBRARY, CULTURAL CENTERP2 - PLAYGROUNDP3 - POOL, TRAILP4 - POOL, CULTURAL CENTER

Page 2 of 2 ends

City of Crescent City - 2026 Public Access Plan
= AREA CLOSED DUE TO CONSTRUCTION
= ROADS TO REMAIN OPEN
= ROAD CLOSURE DUE TO CONSTRUCTION
= BARRICADES/CLOSURE
= TRAIL CLOSED
= TRAIL TO REMAIN OPEN
P0 P1
P2
P3
P4
P0 - DOWNTOWN, PARKP1 - NATIONAL/STATE PARKS, LIBRARY, CULTURAL CENTERP2 - PLAYGROUND (PARTIALLY OPEN)P3 - CLOSED P3
P5 P6
P4 - POOL, CULTURAL CENTERP5 - CULTURAL CENTERP6 - VETERANS MEMORIAL CITY PARKING LOTS:
:ROI
V(YHQLQJ3ULPURVH
$XJXVW%RWDQLFDO6XUYH\5HVXOWV
6FDOHLQFK IHHW
)URQW 6W
% 6W
QG 6W
%DWWHU\6W
6 % 6W
QW
6 $6W
)URQW 6W
&UHVFHQW &LW\
3RVW 2IILFH
)URQW 6W
( 6W
) 6W
* 6W
QG 6W
6WDPSV :D\
+RZH 'U
%D\YLHZ 3DUN
6HD4XDNH
%UHZLQJ
1RUWKFRDVW
0DULQH
0DPPDO &HQWHU
% 6W
3OD\ 6W &UHVFHQW &LW\  'HO 1RUWH &RXQW\
&KDPEHU RI
&RPPHUFH
)URQW
1DWLRQDO DQG
6WDWH 3DUNV
+HDGTXDUWHUV
&UHVFHQW &LW\
6ZLPPLQJ 3RRO
k
   
)HHW
0DSFUHDWHGE\'XVWLQ&RNHO\RI&DPDV//&'DWDXWLOL]HGIURP'HO1RUWH&RXQW\(65,DQG6+1(QJLQHHUV :ROI
V(YHQLQJ3ULPURVH3RSXODWLRQ$VVHVVPHQWFRPSOHWHGE\6+1(QJLQHHUV$XJXVW  %HDFKIURQW3DUN
3URMHFW%RXQGDU\:ROI
V(YHQLQJ3ULPURVH1DWLYH:ROI
V(YHQLQJ3ULPURVH,QYDVLYH+\EULG:ROI
V(YHQLQJ3ULPURVH1RQ)ORZHULQJ:ROI
V(YHQLQJ3ULPURVH1RQ'HWHFW

Page 1 of 1 ends
← All documents from this meeting