Cities Index.
Agenda

Cudahy City Council
November 7, 2023

Document
Agenda
Meeting
November 7, 2023
Body
Cudahy City Council
Pages
411
Original file
56.1 MB
Text extracted from the city's file for reading and search. Open the original on ca-cudahy.civicplus.com. That file is the official record.

RFP to Provide Design Phase Engineering Services for The Preparation of PS&E (Plan, Specifications and Estimates) For the Cudahy Park Renovation Project
City of Cudahy, California RFP, Page 3
of the landowners, grant guidelines, local, state, and federal regulations, and those created by existing conditions such as existing utility facilities. ▪ Review land-use covenant between City of Cudahy and Department of Toxic Substances Control (DTSC) and Remediation Plan. Provide recommendations to ensure project design compliance with restrictions.
▪ Permitting: Receive approvals and permits from all required parties, including, LA County Fire, City of Cudahy, and any other involved regulatory agency. ▪ Council Presentation: Attend Council Meeting for approval of design plans before preparation of final working documents.

Design phase shall be completed within 4 months of issuance of City’s NTP.

Final Product: PS&E Bid Package ready for bidding, including one wet signed plan set, two hard copies, AutoCAD file of plans, hard copy and Ms Word file of Specifications, hardy copy and, Excel file of Estimates, pdf file of all other documents.

Phase 2. Bidding Phase Services:

The Consultant shall provide necessary support services, including but not limited to:
• Attending pre-bid meeting (1 assumed).
• Responding to bidder’s questions.
• Provide bid analysis. Review bid costs/schedule of values of 3 low bidders, and inform City if the costs are in line with estimates. • Recommend lowest and responsive bidder.

Phase 3. Construction Phase Services:
• Provide support to City’s on-site Construction Manager to answer questions and clarifying items which relate to the PS&E package prepared by the consultant. • When requested, review and approve construction submittals and shop drawings to be submitted by the contractor as per the PS&E package.

Phase 4. Additional Construction Phase Services:

On-call construction support services as City deems necessary, which may include but

Page 148 of 616 ends

RFP to Provide Design Phase Engineering Services for The Preparation of PS&E (Plan, Specifications and Estimates) For the Cudahy Park Renovation Project
City of Cudahy, California RFP, Page 4
not be limited to the following tasks:
• When requested, attending monthly construction meetings with the City’s Construction Manager, contractor, and other involved parties. • When requested, reviewing contractor change order requests, and providing necessary information to the City’s Construction Manager as they relate to the consultant’s design.
• When requested, attending project walk-throughs and assisting in preparation of punch list(s).

5. KEY PERSONNEL
It is imperative that the key personnel providing the consulting services have the background, experience, and qualifications to complete the project. The City reserves the right to approve all key personnel individually for work on this contract. All key staff shall be named in the contract. After the contract is signed, the proposer may not replace key staff unless their employment is terminated or agreed upon by the City. The City must approve replacement staff before a substitute person is assigned to the Project.

The City reserves the right to request that the proposer replace a staff person assigned to the contract should the City consider such a replacement to be for the good of the project.

6. CITY’S STANDARD PROFESSIONAL SERVICES AGREEMENT
The RFP includes a sample of City’s Professional Services Agreement as Attachment C.

Proposers shall review the Agreement and provide a statement that they will comply with all aspects of the Agreement, or provide any comments that they would like the City to consider. The City Attorney will review any comment received and make a final decision if all or part or any of such comments may be considered.

7. INSURANCE COVERAGE LIMITS AND REQUIREMENTS
Consultant shall provide Insurance Coverage Limits and Requirements as indicated in this RFP as provided in Attachment D.

Page 149 of 616 ends

RFP to Provide Design Phase Engineering Services for The Preparation of PS&E (Plan, Specifications and Estimates) For the Cudahy Park Renovation Project
City of Cudahy, California RFP, Page 5

8. CONSULTANT SELECTION METHODOLOGY
Upon receipt of Proposals, City’s consultant selection committee will rank the responding consultants. The City, at its sole discretion may invite top 3 ranked qualified consultants to for interviews, or negotiate final scope and fee with the most qualified consultant.

Evaluation Criteria Max
Points
Compliance with the RFP Requirements 15
Project Understanding and Approach 25
Experience 25
Level of effort, schedule and cost effectiveness to provide efficient services. 35
Total Points 100

9. CONTRACT AWARD
Any contract resulting from this RFP will be awarded to a firm whose Proposal meet the technical requirements of the RFP and is evaluated as the highest ranked proposal.

Proposals will be ranked in accordance with the evaluation criteria stated in this RFP.

Negotiations regarding a fair and reasonable price will occur subsequent to consultant selection. Should the City be unable to obtain a fair and reasonable price through negotiations with the highest qualified proposer, the City shall enter into negotiations with the next highest qualified proposer and may award that contract if the parties are able to arrive at a fair and reasonable price. If that is unattainable, the City shall enter into negotiations with the next highest qualified proposer in sequence until an agreement is reached.

10.REQUIRED FORMAT FOR TECHNICAL PROPOSAL SUBMITTAL
Please submit your Technical Proposal in the format specified below:

1. Cover Letter:

Emphasize strong points of the project team and the firm’s experience. Include the name, address, telephone number, title, and signature of the firm’s contact person for this proposal. The cover letter shall state that the submittal is valid for 90 days.

2. Project Specific Approach, Scope of Work:

Page 150 of 616 ends

RFP to Provide Design Phase Engineering Services for The Preparation of PS&E (Plan, Specifications and Estimates) For the Cudahy Park Renovation Project
City of Cudahy, California RFP, Page 6
Provide your understanding of the project, and describe your approach to accomplishing the City’s goal in the most efficient and cost effective manner (including AQ/QC control).

Note: It is expected that the Firms should not simply restate the information contained in this RFP; rather identify critical issues in implementing the proposed improvements, and provide an approach to resolving such critical issues the most efficient and cost effective manner.

3. Proposed Project Specific Staff:

This section should include a project organization chart showing proposed staff members and any subconsultants, and resumes of key project persons. It is imperative that the key personnel providing the required services have the background, experience, and qualifications in similar projects.

4. Similar Projects and References:

Provide a list of similar projects where your firm and proposed project staff have provided similar services. Also provide minimum 3 Public Agency references that City can contact for similar projects and services.

5. City Standard Contract:

The RFP includes City’s Standard Contract as Attachment. Proposers shall review the Agreement and provide any comments that they would like the City to consider.

6. Required Attachments:

Below attachments shall be signed and submitted with the proposal:
• Attachment A - Affidavit of Non-Collusion
• Attachment B - Claims History
The Fee Proposal shall be submitted in a separate envelope as indicated in the following section.

11.FEE ESTIMATE PROPOSAL SUBMITTAL
The Fee Estimate Proposal shall be submitted in a separate sealed envelope. The fee shall be broken in major project components and phases.

Page 151 of 616 ends

RFP to Provide Design Phase Engineering Services for The Preparation of PS&E (Plan, Specifications and Estimates) For the Cudahy Park Renovation Project
City of Cudahy, California RFP, Page 7
Consultant shall also provide its Schedule of Standard Hourly Fee Rates to determine pricing for on-call construction support services.

12.QUESTIONS REGARDING THIS RFP
All questions regarding this RFP must be submitted via email:

Victor Maria Santiago
Parks and Recreation Manager
[email protected]
Questions regarding this proposal shall be submitted via email no later than 10 calendar days prior to proposal due date. In response to all questions received by this date, City will issue an Addendum no later than 5 calendar days prior to the proposal submittal due date. The addendum will be emailed to all RFP recipients on record.

13.PROPOSAL SUBMITTAL PROTOCOL
In order to be considered in the selection process, interested parties shall submit three (3) copies and one (1) electronic copy (pdf) of their Proposals no later than 3:00 PM, November 3, 2022 to the following address:

Victor Maria Santiago
Parks and Recreation Manager
5220 Santa Ana Street
Cudahy, CA 90201
Late proposals will not be accepted.

15.GENERAL INFORMATION
A. Public Record – All proposals submitted in response to this RFP will become the property of the City upon submission and a matter of public record pursuant to applicable law. City reserves the right to make copies of all proposals available for inspection and copying by interested members of the public as records of the City and City shall be under no obligation to the Proposer to withhold such records. In so far as a proposal contains information that the Proposer regards as proprietary and confidential, it shall be the responsibility of the Proposer (and not the City) to specifically identify which items of information are proprietary and clearly identify in writing which specific pieces of information

Page 152 of 616 ends

RFP to Provide Design Phase Engineering Services for The Preparation of PS&E (Plan, Specifications and Estimates) For the Cudahy Park Renovation Project
City of Cudahy, California RFP, Page 8
are proprietary. It shall be insufficient for the Proposer to merely identify the entire proposal or an entire page or set of pages of proprietary. With respect to information deemed proprietary, the procedures set forth under subsection (T) below shall be observed. Not-to-exceed sums, hourly rates and the like that may be set forth in a proposal shall not constitute proprietary information nor shall any information readily available to the general public or any other information not regarded as proprietary and confidential under federal or state law.

B. Right to Request Additional Information – During the evaluation process the City reserves the right, where it may serve the City’s best interest, to request additional information or clarifications from Proposers, or to allow corrections of errors or omissions. At the discretion of the City, firms submitting proposals may be requested to make oral presentations as part of the evaluation process.

C. Reserving Rights - The City reserves the right to reject any and all proposals received as a result of this RFP. City’s potential award of a contract will not be based on any single factor nor will it be based solely or exclusively on the lowest cost proposal. If a contract is awarded, it will be awarded to the proposer who in the judgment of the City has presented an optimal balance of relevant experience, technical expertise, technological innovation, price, quality of service, work history and other factors which the City may consider relevant and important in determining which proposal is best for the City.

D. Discrimination - The Proposer and all subcontractors must not discriminate, nor permit discrimination against any person on the grounds of race, national origin, sex, handicap, sexual orientation, or veteran status in their employment practices, in any of their contractual arrangements, in all services and accommodations they offer the public or in their business operations.

E. Gratuity Prohibition - Proposer shall not offer any gratuities, favors or anything of monetary value to any official, employee or agent of the City for the purpose of influencing consideration of this proposal.

15.PRE-CONTRACTUAL EXPENSES IN RESPONDING TO THE RFP PREPARATION The City shall not be liable for any pre-contractual expenses incurred by any proposer or by any selected consultant. Each proposer shall protect, defend, indemnify, and hold harmless the City from any and all liability, claims, or expenses whosoever incurred by, or on behalf of, the entity participating in the preparation of its response to this RFP. Precontractual expenses are defined as expenses incurred by proposers and the selected consultant, if any, in:
▪ Preparing and submitting information in response to this RFP

Page 153 of 616 ends

RFP to Provide Design Phase Engineering Services for The Preparation of PS&E (Plan, Specifications and Estimates) For the Cudahy Park Renovation Project
City of Cudahy, California RFP, Page 9
▪ Negotiations with the City on any matter related to this procurement ▪ Costs associated with interviews, meetings, travel or presentations ▪ All other expenses incurred by a proposer/consultant prior to the date of award and a formal notice to proceed.

The City reserves the right to amend, withdraw and cancel this RFP. The City reserves the right to reject all responses to this request at any time prior to contract execution, or only award a partial contract for a limited scope of work. The City reserves the right to waive minor irregularities and request or obtain additional information about any and all proposals.

END OF RFP

ATTACHMENTS TO FOLLOW

Attachment A Affidavit of Non-Collusion
Attachment B Claims History
Attachment C Sample Professional Services Agreement
Attachment D Insurance Requirements
Attachment E Project Conceptual Scope

Page 154 of 616 ends

ATTACHMENT A

AFFIDAVIT OF NON-COLLUSION
I state that I am _____________________________________ (title) of __________________________________ (name of firm) and that I am authorized to make this affidavit on behalf of my firm, and its owners, directors, and officers. I am the person responsible in my firm for the price(s) and the amount of this Offer.

I state that:
(1) The price(s) and amount of this Offer have been arrived at independently and without consultation, communication or agreement with any other Proposer or potential Proposer. (2) That neither the price(s) nor the amount of this Offer, and neither the approximate price(s) nor approximate amount of this Offer, have been disclosed to any other firm or person who is a Proposer or potential Proposer, and they will not be disclosed before Solicitation opening. (3) No attempt has been made or will be made to induce any firm or person to refrain from bidding on this contract, or to submit an Offer higher than this Offer, or to submit any intentionally high or noncompetitive Offer or other form of complementary Offer. (4) The Offer of my firm is made in good faith and not pursuant to any agreement or discussion with, or inducement from, any firm or person to submit a complementary or other noncompetitive Offer. (5) ________________________________________ (name of firm), its affiliates, subsidiaries, officers, directors and employees are not currently under investigation by any governmental agency and have not in the last four years been convicted of or found liable for any act prohibited by State or Federal law in any jurisdiction, involving conspiracy or collusion with respect to bidding on any public contract, except as described in the attached appendix.

I state that________________________________________ (name of firm) understands and acknowledges that the above representations are material and important, and will be relied on by the City of Cudahy in awarding the contract(s) for which this Offer is submitted. I understand and my firm understands that any misstatement in this affidavit is and shall be treated as fraudulent concealment from the City of Cudahy of the true facts relating to the submission of Offers for this contract.
_________________________________________________
(Authorized Signature)
_________________________________________________
(Name of Company/Position)
Sworn to and subscribed before me this _______ day of __________________, 20___. _________________________________________________
Notary Public for California
My Commission Expires: ______________________

Page 155 of 616 ends

ATTACHMENT B

CLAIMS HISTORY
Each Consultant shall submit a summary of whether or not any of the following events have occurred within the past (10) years and, if so, a brief description of the circumstances involved (including, without limitation, the names of parties involved, current status and final disposition of the matter of dispute):

Failure to disclose any circumstances requested in the following paragraphs is grounds for disqualification.
▪ Failure by Consultant or any sub-consultant to enter into a contract to which it has received an award by a public entity.
▪ Forfeiture of a bid or proposal bond by proposer or any sub-consultant. ▪ Termination for default under a contract awarded by a public entity to Consultant or any sub-consultant.
▪ Debarment of Consultant or any sub-consultant by any municipal, county, state, federal, or local agency (note: debarment is grounds for automatic disqualification). ▪ The filing of a lawsuit or arbitration in which the Consultant or a sub-consultant was a defendant or cross-defendant at any time within the past ten (10) years that involved the performance of project, program, or engineering services and that involved an amount in controversy sought to be recovered from Consultant or the sub-consultant of more than $100,000.00.
▪ Conviction of Consultant, a sub-consultant, or any of their principals or officers for violation of a state or federal antitrust law involving bid rigging, collusion, or restriction on competition between bidders, or conviction of violating any other federal or state law relating to bidding or contract performance (note: such conviction is grounds for automatic disqualification).
▪ Any publications involving firm or principals alleging or claiming corruption (such claims are grounds for automatic disqualification).
▪ Any suspension, revocation, or other disciplinary proceeding relating to a contracting or professional license issued to proposer or a sub-consultant.

Page 156 of 616 ends

ATTACHMENT C
Professional Services Contract

Page 157 of 616 ends

ATTACHMENT D
Insurance Requirements

Page 158 of 616 ends

ATTACHMENT E
Project Conceptual Scope

Page 159 of 616 ends

20 EXHIBIT “B”

CONSULTANT PROPOSAL

Page 160 of 616 ends

City of Cudahy
Proposal
Provide Design Phase Engineering
Services for the Preparation of PS&E for
the Cudahy Park Renovation Project
November 3, 2022

Page 161 of 616 ends

Design Phase Engineering Services for the
Preparation of PS&E for the Cudahy Park Renovation ii
City of Cudahy
Table of Contents

1. Cover Letter .............................................................................................................................................................. 1

2. Project Specific Approach, Scope of Work................................................................................................................ 3 Introduction............................................................................................................................................................... 3 Firm’s Understanding of Objectives .......................................................................................................................... 5 Proposed Improvements – Discussion on the Major Items................................................................................... 6 Key Issues............................................................................................................................................................... 8 Project-Specific Approach.......................................................................................................................................... 9 Scope of Work .........................................................................................................................................................12

3. Proposed Project Specific Staff..............................................................................................................................18 Organizational Chart................................................................................................................................................18 Project Staffing ........................................................................................................................................................18 Subconsultants ........................................................................................................................................................19 Key Project Team Members.....................................................................................................................................21 Resumes...................................................................................................................................................................23

4. Similar Projects and References ............................................................................................................................45

5. City Standard Contract...........................................................................................................................................51

6. Required Attachments...........................................................................................................................................52 Attachment A – Affidavit of Non-Collusion .............................................................................................................52 Attachment B - Claims History................................................................................................................................. 54 In accordance with the City’s RFP, Willdan’s Fee Estimate Proposal has been submitted in a separate sealed envelope.

Page 162 of 616 ends

1. Cover Letter
November 3, 2022
City of Cudahy
5220 Santa Ana Street
Cudahy, CA 90201
Attn: Victor Maria Santiago
Parks and Recreation Manager
Subject: Proposal for Design Phase Engineering Services for the Preparation of PS&E (Plan, Specifications and Estimates) for the Cudahy Park Renovation Project The City of Cudahy is interested in contracting with an experienced and qualified firm to provide professional design services for the Cudahy Park renovations. Willdan’s qualifications include:

Industry Leader with Significant Park Renovation Experience Willdan Engineering (Willdan), a Southern California-based firm, has been a consistent industry leader for more than 58 years providing all aspects of municipal and infrastructure engineering, building and safety, public works, public financing, planning, and construction management services. Willdan has assembled a team who are committed to providing top-quality services to the City of Cudahy (City). We believe that we are highly qualified to undertake this assignment because of the special challenges involved in the project.

Deep Understanding of the City’s Requirements
Willdan thoroughly understands the City’s priorities and processes. We currently have staff working at the City through our On-call City Engineering contract including our proposed Technical Advisor Mr. Sal Lopez, who is serving as the City’s Community Development Director. During the last five-plus years, Mr.

Lopez has shepherded the adoption of the City’s General Plan and Zoning Code update, successfully acquiring grant funding to support the update to the city’s Housing Element and the adoption of an Inclusionary Housing Element. He continues to assist the City with their Successor Agency needs, and was instrumental in the City’s pursuit of Proposition 68 funding for the proposed improvements to Cudahy Park. He is very familiar with the site and its opportunities and challenges.

Strong and Talented Leadership
Leading our Willdan team, as the Project Manager, is Mr. John Hidalgo. Mr. Hidalgo’s background is a blend of public and private practice. He is very experienced in park planning, sports facilities, recreational developments, residential, streetscape and urban beautification projects; as well as regional, community, and neighborhood parks. Mr. Hidalgo will be fully supported by our in-house staff of civil, geotechnical, planning and construction management professionals.

Willdan’s proposed personnel are all experienced in working as an integral part of agency staff and, therefore, are familiar with municipal standards, guidelines, and procedures. This knowledge and experience will allow Willdan to be most responsive to your requirements. As a multidisciplinary firm, we have a full complement of resources under one roof to provide thorough and accurate design and project management.

Page 163 of 616 ends

City of Cudahy
Cudahy Park Renovation Project

Page 2 ends

Specialty Consultants
Augmenting our Willdan staff our four specialty subconsultants with experience and qualifications in the City’s scope of work. M Y Engineering, Inc. (Electrical and Lighting Design) is a professional consulting engineering firm providing full mechanical, electrical, plumbing (MEP) on-call engineering services. ELMT (Contaminated Soils) has 50+ years of experience providing timely and cost-effective environmental solutions and planning services. Spohn Ranch (Skate Park Design) is an award-winning skate park designbuild firm with 30 years of municipal skate park projects spanning 40+ states in the nation. AWu Government Services (Architectural Design) is a full-service architectural firm with a professional staff of architects, planners, and design specialists who have completed over 2,000 projects for over 50 different municipalities/public agencies.

Highly Relevant Park Renovation Experience
Willdan has provided landscape architectural design services for a vast number of park renovations, including:
 Children’s play areas
 Walking trails
 Sports fields
 General recreational facilities
modifications
 Shade shelters
 Fitness facilities
 Water play
 Skate parks
Our experience also includes over 40 public use facilities with similar features including recreational and fitness facilities, residential uses, schools, bike paths, redevelopment districts, city beautification projects, and high-profile multi-use venues including Artesia Live I and II Specific Plans and the new Sofi Stadium in Inglewood.

As Principal-in-Charge, I will ensure Willdan Engineering resources are made available to meet the needs of the project task assignments and will be available to the City throughout the duration of the contract.

Willdan acknowledges the receipt of the City’s Response to Q&A and the Land Use Covenant issued on 10/27/2022. Willdan’s submittal is valid for 90 days.

If you have any questions or need additional information, you may contact me at 657-223-8557 and/or by email at [email protected]. You may also contact Mr. Hidalgo at (562) 364-8505 and/or by email at [email protected]. I hope we convey herein our sincere interest in working with the City, and I look forward to further discussing how Willdan Engineering may continue to assist you with meeting your park renovation goals for this contract.

Respectfully submitted,

WILLDAN ENGINEERING
Tyrone Peter, PE
Deputy Director of Engineering
2401 E. Katella Avenue, Suite 300
Anaheim, CA 92806
P: (657) 223-8557

Page 164 of 616 ends

Design Phase Engineering Services for the
Preparation of PS&E for the Cudahy Park Renovation
City of Cudahy
3 2. Project Specific Approach, Scope of Work
Introduction
Willdan Engineering (Willdan), a California Corporation, is part of Willdan Group, Inc. (WGI), a NASDAQ publicly traded Delaware Corporation and nationwide firm serving more than 800 public agencies and private sector clients. Founded in 1964
and headquartered in Anaheim,
California, Willdan was originally
established as a civil engineering firm
specializing in providing solutions for
our public agency clients. Since that
time, we have evolved into a
professional consulting firm offering a
broad array of services that allows us
to provide a comprehensive and
integrated approach to our clients’
planning, engineering, financial,
economic, public facility, public safety,
and energy sustainability solutions.

Today, Willdan has over 1,500 employees operating in 56 offices across 26 states. We have supported the implementation of community visions through engineering, construction management, inspection, planning, building safety, and staff augmentation services. Willdan has completed various types of projects for over 90 percent of the cities and counties in California.

Throughout our 58-year history, Willdan has sustained consistently healthy financial performance.

Willdan has the financial strength and wherewithal to complete all projects we undertake. This is due, in part, to a respected reputation in the municipal engineering industry for providing timely, cost-effective, innovative engineering solutions that exceed our clients’ expectations and for providing exceptional customer service to our many clients. The firm has the resources and appropriate staffing to perform and complete all contractual project obligations. Financial information, including information on revenue, earnings, and cash flow, is issued quarterly and can be found on the Investors page of our website at https://ir.willdangroup.com/.

Willdan possesses expertise in most facets of the public sector marketplace. The varied experience and background of our staff experience is an added value of our services. No other firm matches Willdan’s combined breadth of directly relevant technical and operational expertise and depth of experience.

Willdan's corporate-wide capabilities include a full range of civil and structural engineering, land planning, financial and economic consulting, geology and geotechnical engineering, environmental health and safety, and energy efficiency solutions consulting services.

We provide professional services in all phases of City activities from project development, grant funding application assistance and administration, site analysis, and conceptual development to final design, construction management, observation, and project close-out.

Page 165 of 616 ends

Design Phase Engineering Services for the
Preparation of PS&E for the Cudahy Park Renovation
City of Cudahy
4 Willdan Staff of Experts
 Municipal Engineering and Management
 Highway and Freeway Engineering
 Building Safety Services
 Environmental Planning
 Geotechnical/Geological Engineering
 Assessment Engineering
 Computer-Aided Analysis and Design
 Geographical Information System (GIS)
 Program and Construction Management
 Construction Inspection and Support
 Traffic and Transportation
 Water and Wastewater
 Urban and Regional Planning
 Drainage and Flood Control
 Structural Engineering
 Right-of-Way Engineering
 Landscape Architecture
Among all the services we provide, Willdan’s Landscape Architecture Department plays a key role in providing a unique sense of place for our clients in developing their park projects.

Landscape Architecture
Willdan has registered landscape architects with support personnel. In developing quality projects and plans, these landscape architects apply their talents and knowledge in site analysis, user needs programming, site design, urban design, landscape preservation, park master planning, land management, and water conservation. With their combined experience on almost 70 major parks, mostly in California, our landscape architects offer an essential array of services and expertise that adds long-term value to projects and communities.

Willdan’s landscape architects enjoy the support of related disciplines such as survey, civil, structural, traffic engineering, building and safety, environmental and construction management and observation.

In-house peer review at critical stages is practiced.

Unlike most firms, Willdan works primarily for governmental entities, thereby minimizing potential conflicts of interest. Willdan’s staff assists its clients to economically streamline projects from concept through planning, design, construction and management. This approach ensures long-term relationships with the jurisdictions we service and allows Willdan to add the necessary staffing to meet the needs of our clients and maintain mutually beneficial relationships.

Services
The list below illustrates services that are currently offered by Willdan’s landscape architectural group:

Design
 Recreation Facilities
 Park and Master Plans
 Urban Beautification
 Bidding and Construction
Documents
 Design Manual and
Guidelines
 Irrigation Systems
Inventories
 Drought Adaptive
Plantings
Urban Forestry
 Street Tree Inventory
 Arboriculture
Landscape Management
 Construction and Administration
 Plan Check Services
 Maintenance Specifications
Planning
 Site
 Urban

Page 166 of 616 ends

Design Phase Engineering Services for the
Preparation of PS&E for the Cudahy Park Renovation
City of Cudahy
5 Firm’s Understanding of Objectives
In general, it is the City’s goal to transform the existing park into an aesthetically pleasing productive park with the installation of a variety of amenities and uses that a broad spectrum of the community can benefit from and utilize. Cudahy Park is estimated at 5.9 acres. The entire Cudahy complex encompasses an estimated 8 acres. The complex includes the civic center such as City Hall, a branch of the Los Angeles County Public Library system and a community building for multi-purpose uses named Bedwell Hall. The shape of the site is primarily rectangular with a relatively flat topography with mature trees. The park site is bordered by residential, an elementary school and the Los Angeles River. The existing park has mature trees; therefore, careful attention will be made to protect in place those trees and design the improvements away from any root intrusion. A few of the trees will need to be removed to accommodate the new improvements.

The City conducted a series of community workshops to obtain input and feedback regarding the planning for the renovations. A final schematic site plan was prepared and accepted by the community and City representatives. The funding for the improvements is made available through a Statewide Park Development and Community Revitalization Grant program in the amount of $6.9 million.

It is our understanding, based on the City-furnished schematic plan, the City would like the following improvements at Cudahy Park:
 New shaded all-inclusive ADA accessible playground
 New ADA-accessible drinking fountains
 New trash receptacles and bench seating
 New stage
 Renovate the basketball courts
 Renovate the multi-purpose fields
 Renovate the tennis courts
 Renovate the skate park
 Renovate the playground
 New shaded splash pad
 New walking trails
 New shaded fitness stations
 New area lighting
 New shaded area for picnic tables and barbeques
 Upgrade irrigation system to meet California Model Water Efficient Landscape Ordinance (MWELO), e.g., “Smart” technology
 The installation of a planting palette consisting of trees, shrubs and groundcovers that are California native and drought-adaptive species for this geographic region of the Los Angeles basin
Additionally, it is our understanding that the park site currently has onsite parking and offsite parking.

Our scope of work will include reviewing the existing park for ADA-compliant parking stalls and ADA path of travel routes to the various park amenities.

Page 167 of 616 ends

Design Phase Engineering Services for the
Preparation of PS&E for the Cudahy Park Renovation
City of Cudahy
6 Furthermore, Willdan understands that the City has in place a “Covenant to Restrict Use of Property” (recorded in Los Angeles County) between the Department of Toxic Substances Control. Two locations within the park project limits will require specific requirements regarding the development in those respective areas.

Proposed Improvements – Discussion on the Major Items
Playground and Fitness Stations. The playground equipment will be selective based on an all-inclusive playground system that promotes a high-value experience for the various age groups. These play systems will encourage and challenge the park user. Additionally, the play equipment can improve coordination and strength along the way.

The exercise stations will be selected based on accessibility and ease of use to accommodate multiple types of physical fitness levels for strength building and coordination. Additionally, the selection of the equipment will be based on a fitness circuit approach that can be utilized by the users as an option.

Rubberized Surfacing. The surface material for the playgrounds and fitness areas will be the latest technology in rubberized components and one that is sustainable and produced with recycled materials.

The surface material will be one of having long-lasting durability and wearability and having the proper coefficient of friction suitable for this type of play and exercise value.

Walkways and Park Lighting. These areas are designed per Illumination Institute Standards (IES) with special attention paid to energy efficiency. We have started to use L.E.D. fixtures in addition to the standard Metal Halide approach when cost effective. Time clocks and photo-cell control will also be included, along with vandal resistance and glare. The lighting fixtures will be selected based on the latest advanced technology in lighting efficiency. Reducing glare to adjacent properties is especially important and will be controlled through fixture type and aiming. The optimum light direction will be determined to set the pole heights, the pole placement, and the light levels required for this park site Basketball Courts, Tennis Courts and Multi-Use Fields. The multi-use fields will be designed with the latest technology in sub-soil base and amendments for proper drainage and moisture retention. The basketball and tennis courts’ design will be a regulation size full court size with a non-slip surfacing suitable for outdoor play. The proper placement of expansion joints and control joints enables resistance for concrete crack control.

Sports Lighting. The lighting fixtures will be selected based on the latest advanced technology in lighting efficiency. Reducing glare to adjacent properties is very important and will be controlled through fixture type and aiming. Due to various leagues using these fields, the optimum “class of play” must be determined to set the pole heights, the pole placement, and the light levels required for the most restrictive use. This can be determined after meetings with the stakeholders and City staff.

Picnic Shade Shelters and Community State Architectural Design. Willdan will be utilizing the services of a design-build and manufacturing company that specializes in pre-engineered shade shelters and community stage coverings. As we have learned in past projects, this is a cost-effective and timesensitive approach for this type of construction in a park environment. The manufacturing company makes available many options and amenities that allow for a customized appearance. The shelters will be designed with the most current in construction materials technology. Special attention will be placed on the use of recycled materials for the shelters. For lighting consideration, the use of photovoltaic (solar) systems will be implemented. The specified products and materials for the shelter will be the latest in "Green" technology and efficiency.

Page 168 of 616 ends

Design Phase Engineering Services for the
Preparation of PS&E for the Cudahy Park Renovation
City of Cudahy
7 Walking Paths and General Pedestrian Circulation. Many park users come to this park for both sports and leisure activities. Willdan's design will look at the walking paths throughout the improvement areas and ensure the pathway network has a continuous paved surface. This pathway will include access from the street and other various locations. In addition, these improvements will facilitate a designated pathway for the pedestrian, thus offering a safe and understood environment within the park site.

Furthermore, the walks/pathways will be designed to comply with current guidelines under the Americans with Disabilities Act (ADA).

Energy Conservation. Consideration will be given to any concepts the City would like used, including photo-voltaic solar systems and LED lighting. Other emerging technologies will be used as they become cost-effective.

Irrigation and Planting. The development of the landscape design will incorporate all aspects of local and state water conservation standards, including meeting the requirements of the California Model Landscape Efficient Ordinance (MWELO). The turf species selected for the open field use will be for its low maintenance, good durability, fast recovery, pest resistance and suitability for this particular geographic region. It has been our experience that the second most important aspect of turf fields (first being irrigation coverage) is the backfill mix within the root zone. Having the proper mixture of organic and inorganic materials in the soil mix allows adequate percolation as well as inhibits soil compaction.

Furthermore, the routine maintenance of soil amendments, such as humate soil conditioners, strengthens the turf for drought tolerance, durability and recovery.

The tree, shrub and groundcover palette will be comprised of drought-tolerant species suitable for the geographic area, along with a well-designed irrigation system that delivers the highest efficiency. All plants will be chosen based on low maintenance requirements such as trimming/pruning cycles, mowing, fertilization needs, and hardiness. Willdan has demonstrated experience in integrating drought-tolerant and low-maintenance plant materials in major urban designs such as sports complexes, city streetscapes, freeways and demonstration gardens.

For the irrigation systems, careful analysis and assessment will be considered. New irrigation mainlines and points of connection (meter and backflow prevention location) will be part of the renovations, along with all new sprinklers/dripline/rotors that achieve maximum water distribution to the planting material. This will start a clean slate for many years to come.

Site Amenities. Along with these major improvements, simple amenities such as bicycle racks, trash receptacles, drinking fountains, and benches will be incorporated into the park site. In addition, overhead shading structures are planned for the playground and picnic table. All these amenities noted will be selected based on sustainability materials, ease of replacement parts and durability for public park use.

Splash Pad. The splash pad design will include a variety of experiences for the users. Options will be presented to the City prior to the final design. The water output among the various spray fountains and water collection buckets will offer unique play values. The mechanical equipment such as pumps, sanitizing reservoirs, filters, and electronics will be the latest technology in efficiency and water conservation.

Bioswales. Willdan will include an analysis and design to include bioswale facilities within the park in accordance with the guidelines outlined in the LA County LID Manual.

Page 169 of 616 ends

Design Phase Engineering Services for the
Preparation of PS&E for the Cudahy Park Renovation
City of Cudahy
8 Water and Sewer Improvements. Willdan will include water and sewer design for connections and pipelines to service the splash pad and drinking fountains in accordance with the water purveyor and County of Los Angeles Department of Health Standards.

Key Issues
Willdan identifies the following “key” issues that may be encountered on the Project based on our prior experiences.

Utilities
Willdan’s initial review of existing utilities within the project area will be conducted based on available contract documents or as-built plans from City and County records. Utilities that appear to be impacted by the project will be identified, field verified and discussed with the utility owner so that both physical and cost impacts can be appropriately addressed in the design. Willdan will coordinate and maintain a liaison with known area utilities. Potholing for underground utilities impacted by subsurface construction activities may be necessary to determine actual depths and locations of known utilities (this will be performed as additional services if necessary). Willdan will send notifications to utility companies so that planned utility installations are performed prior to park construction. In addition, Willdan will submit a set of preliminary plans to each affected utility company for comments and coordinate the potholing of utilities that interfere with proposed improvements, either by the utility company or by an independent contractor as extra work if the utility has prior rights. Furthermore, we will submit a set of final plans to each affected utility company with final notification for the completion of utility work. Finally, Willdan will provide the City with a brief written summary of the utility coordination status upon delivery of final construction contract documents to the City.

Site Grading and Drainage and Topographic Survey
In general, the park site topography is relatively flat, and all four sides of the site are bounded by hardscape surfaces, e.g., asphalt paving, and concrete sidewalks. For this reason, site grading will be straightforward, with the goal of ensuring sufficient slope to maintain drainage and the retention of current drainage patterns. Some of the modifications will include area drain relocation and additions. A topographic survey will be performed to document current conditions such as existing grades, surface culture and any other existing items/structures, along with assisting with designing/placement of the new developments, e.g., community stage.

Water quality management measures will be implemented for this project. Those structures include bio-swales and stormwater filtration chambers. Furthermore, Willdan will work closely with the jurisdictions/agencies of the storm drainage system involved in the adjacent/vicinity of the park site.

Post Construction
Along with a well-thought-out design, the long-term effects regarding the maintenance of the facilities are a consideration we feel is highly important. An area may appear to be optimal, but the cost of maintenance is a question that sometimes gets overlooked. Our design will address maintenance concerns, such as low, medium or high maintenance, along with budgets to consider. Willdan believes good, effective design should be compatible with reasonable maintenance costs. Such elements of the design we look at include planting material selection, paving materials and transitions, and general access for serviceability.

Page 170 of 616 ends

Design Phase Engineering Services for the
Preparation of PS&E for the Cudahy Park Renovation
City of Cudahy
9 Tree Preservation
Willdan will make tree preservation a priority when designing the new improvements. Our site reconnaissance will assist in determining proper distances from tree trunks with respect to the walkways and other significant features.

Hazardous Material Remediation:

Hazardous material remediation design will include the recommendations of the Los Angeles Department of Toxic Substances Control (DTSD) Covenant and Agreement with the City regarding the presence of toxic materials along the River Road Areas and the Tree Areas. A Soil Management Plan has been included in our scope and any related design would address the required remediation of the excavation soils based on the recommendations of the City/DTSD Covenant and Agreement.

Project-Specific Approach
Projects, no matter how big or small, are approached similarly by the Willdan team in that they are thought out clearly and carefully during the earliest stages of the project. This equates to a detailed study of the project requirements during the proposal stage, the assignment of a project manager experienced in those project requirements, and the establishment of a project team with individual expertise in their assigned tasks.

Our vision is that the park renovations should be unique, an asset to the surrounding community and maintain its identity as a recreational environment.

Good planning is an essential element of any design – whether the design is for a recreational park or institutional facility. Willdan understands the importance of well-designed park planning and is experienced in integrating solid design and planning into any setting. As we envision, community parks are divided into several components corresponding to their various uses and are situated in park-like settings complete with walkways, sitting areas and shade areas. This tranquil and aesthetically pleasing setting translates into an effective and conducive space for play and relaxation. Willdan shall strive to create a unique experience for the park improvements that is harmonious with the surroundings and strive for congruency within the project site.

Furthermore, safety and circulation are important factors in design, particularly in a well-planned park environment. These two basic design elements in a public space cannot be compromised or overemphasized. Indeed, one of the most important functions of landscape architecture in a park environment is to convey safe and comfortable surroundings. A well-designed park environment can only generate enthusiasm among its users.

The above considerations will be the driving force behind the design throughout this project. While minor subtleties can occur in smaller spaces such as small gathering plazas, the overall design should offer diversity while maintaining a common thread in the landscape that unifies the park site as a whole.

Willdan’s design philosophy follows the Frank Lloyd Wright maxim: Form Follows Function. This does not mean rigidity in any sense, but that a successful design must work for its intended use. The logical design process then is:
 Determine the users.
 Ascertain goals and needs.
 Development spatial requirements for the intended uses.  Analyze the site for constraints and opportunities to meet desired spatial needs.

Page 171 of 616 ends

Design Phase Engineering Services for the
Preparation of PS&E for the Cudahy Park Renovation
City of Cudahy
10  Develop use/space relationships that integrate like uses and segregate unlike uses. (Conceptual alternatives in relation to site opportunities.)
 Use circulation as the means of connecting spaces and creating form. Use plantings to define spaces, including buffers.
 In the construction drawing implementation, use the economy of means principle. This, basically, is value engineering. It is concerned with a useful life, constructability, efficiency of maintenance, low water use, etc.

The final result is a design product that is creative in landscape personality, respective of site attributes, and provides the client and public the most value for their tax dollars. Landscape architecture should be unique; an asset to the surrounding area yet maintain its identity in its final form and function.

Project Execution - Over the course of the past 52 years, Willdan has developed very practical and successful techniques to project development and delivery. In essence, the following summarizes our approach to delivering your projects on time and within budget.

Once the course of action is established, Willdan will develop a project schedule. The schedule will be circulated to the City and other pertinent stakeholders for review and acceptance. The schedule will be developed with the City’s project completion date in mind and will include and measurable milestones to ensure the project completion date is met and is consistent with the City’s timeline. Below is a summary of work:
 Willdan will conduct regular project progress meetings with the City to report progress, any outstanding issues, and proposed resolutions including updating the City with status reports regarding other agency(s) having jurisdiction with this project. Meeting minutes with action items will be provided.
 Willdan will coordinate with City and pertinent stakeholders to schedule the review of project deliverables.
 Willdan will coordinate with the City and pertinent stakeholders to schedule the required meetings with regulatory agencies for deliverables review and approval  Willdan will complete all required revisions and obtain approval from the City and regulatory agencies for the project deliverables.

Quality Assurance and Control Procedures - Quality assurance and control procedures are critical to ensuring sound technical practices are in place and quality deliverables are produced. Willdan operates daily under a company-wide Quality Assurance/Control Program.

Page 172 of 616 ends

Design Phase Engineering Services for the
Preparation of PS&E for the Cudahy Park Renovation
City of Cudahy
11 Ms. Vanessa Muñoz, PE, TE, PTOE will serve as
Quality Assurance Manager for the Cudahy Park
renovation contract. In this role, she will be
responsible for ensuring Willdan's quality
assurance/control policies are followed and will
coordinate with our project staff to develop and
implement project-specific quality
assurance/control activities at the beginning of
the project. Typical activities entail:
 Assigning appropriate technical staff
 Developing and implementing proper
project technical approach
 Establishing project schedule meeting City
deadlines
 Determining the proper level of quality
assurance/control reviews
To provide quality deliverables to all our clients,
Willdan has implemented strict quality control review processes and procedures. Mr. Hidalgo will be responsible for the planning and successful execution of the quality assurance reviews. All deliverables must be reviewed under our quality assurance procedures. The two major components of the review are technical and editorial reviews ensuring:
 Data is interpreted correctly
 Calculations are complete and accurate
 Conclusions or recommendations are sound and appropriate  Deliverables meet the requirements of the scope of work The technical editorial review ensures deliverables are well organized, easy for the non-technical reader to understand and follow, adheres to Willdan's standards and the City's requirements, and all grammatical and spelling errors are corrected. There are three levels of our quality assurance/control review for project deliverables:
 Level 1 - peer technical review and consultation
 Level 2 - peer technical review and consultation and editorial review (document)  Level 3 - peer technical review and consultation, editorial review, and professional engineer review
In general, the appropriate review level will be determined during the planning stage and reviewers will be identified to ensure the quality assurance reviewer can participate throughout the project. All reviews and corrective actions will be documented and incorporated in the project file for future reference.

Mr. Hidalgo will perform a final quality assurance review to monitor quality assurance/control activities to ensure the City's project objectives are met at the completion of the project with project deliverables provided within identified timeframes.

Quality Assurance Review Goals
 Allocate time for quality assurance under a
project management task or as a separate line item
in all proposals
 Review all work products for grammatical
correctness and format by administrative staff prior
to technical content review by senior staff
 Peer review all major work products for technical
content by appropriately qualified senior planning
staff prior to submittal to Cudahy
 Use templates that have been generated over time
for all major work products to ensure they meet
City standards and are compliant with applicable
and up-to-date state and/or federal regulatory
requirements and industry standards
 Perform post-project follow-up to ensure work
products met Cudahy's expectations

Page 173 of 616 ends

Design Phase Engineering Services for the
Preparation of PS&E for the Cudahy Park Renovation
City of Cudahy
12 Scope of Work
Willdan acknowledges and understands the scope of work and deliverables presented in the City’s request for proposal. The scope of services below provides additional information related for the implementation of the project.

Preliminary Design
Kick-Off Meeting. Upon receiving the notice to proceed from the City, Willdan will prepare a project schedule based on the scope of work presented in the proposal. The schedule will be submitted to the City for review and acceptance. If other items come up after the original schedule was accepted, Willdan will revise/update the schedule to meet the City’s timeframe. Willdan will participate in a kick-off meeting to include the decision-makers from the City and other agencies such as gas and electrical and other agencies that become known to us resulting from our research. The meeting will be used to discuss project scope and schedule including design goals and criteria, roles and responsibilities, work program, budgeting, utility coordination, plan and specifications preparation, cost estimate, submittal reviews, and anticipated construction issues.

Topographic Survey, Field Review, Research and Data Gathering. Willdan will conduct a field investigation to verify existing topographic conditions and identify unusual or special conditions and review available improvement plans, utility plans, and data records within the project area. A topographic survey will be performed to document current conditions such as existing grades, surface culture and any other existing items/structures, along with assisting with designing/placement of the renovations/improvements.

As part of our field review, research and data gathering, Willdan would like to arrange a meeting with the City's maintenance facilities managers and/or supervisor to obtain as much detailed information as possible regarding the proposed improvements (e.g., drainage, hardscape, circulation, irrigation, plant material, etc.). This input will provide specific recommendations pertaining to the improvements for the purposes of maximizing the budgets. Additionally, the purpose of the meeting is to get first-hand knowledge about the existing irrigation system and discuss proposed modifications to accommodate the new landscaping. Furthermore, this field review will also identify potential design constraints and conflicts and observe general site conditions.

Geotechnical Investigation. Willdan will review the available subsurface data or published geologic and geotechnical maps and documents to determine general subsurface conditions at the project site; and determine the most appropriate locations for borings. The proposed field investigation will include site reconnaissance and subsurface exploration. Geotechnical laboratory testing will be performed on representative samples of soil to evaluate the engineering characteristics of these materials. This information will be valuable in determining the subsurface drainage as well as the footing design for the structural design of the shade shelter and community stage, general paving installations, bioswales and water quality management, thus managing the construction costs at the beginning. Known clearance of subsurface utilities from Underground Service Alert will be obtained prior to commencement of field exploration.

Utilities. Willdan will conduct a utilities investigation (i.e., water, sewer, gas, electrical, cable, telephone, stormwater) of known utilities within and near the project improvements. The investigation will identify any potential or conflicting issues that can have a significant impact on the project. By knowing this information at the beginning stage, the limits and constraints can be planned accordingly.

Page 174 of 616 ends

Design Phase Engineering Services for the
Preparation of PS&E for the Cudahy Park Renovation
City of Cudahy
13 Willdan will review and present specific requirements for utility facilities including protection, relocation, right-of-way, and construction methods within the vicinity of the utility.

Utility information will be requested from each utility company that has facilities within the limits of the project. This information will be incorporated into the design plans and plotted per the atlases provided by each utility company. Willdan will forward plans to the utility companies requesting verification. At this time, any potential utility conflicts will be identified and presented to the City for discussion and proposed solutions. (Note: Willdan will provide a fee proposal for design services for utility relocation, if required.) A review of the utility information will be performed to determine the impact of the project on the various utilities and any required potholing by utility companies will be coordinated.

Environmental. Willdan will review the environmental documents to determine whether there are any mitigation measures that are required to be fulfilled in the design of the proposed improvements.

Said mitigation measures will be incorporated into the design of the park and associated park improvements.

Design Development Plan and Preliminary Opinion of Probable Costs. Following the survey, research, site data gathering and base mapping, Willdan will prepare a design development plan based on the descriptions of improvements presented in the City-furnished schematic plan. The design development plan will address in further detail an understanding of the spatial requirements and relationship for the renovation improvements including circulation functions, landscape and irrigation, utility infrastructure, shade shelter and community stage architecture, electrical engineering, and grading and drainage systems. In addition, specific items that will be illustrated in the plan are:
 Address easements and drainage patterns.
 Address the footprint of the pre-engineered shade shelter and community stage including elevations.
 Address fencing materials.
 Address the playgrounds.
 Address the skate park.
 Address the fitness station equipment.
 Address the rubberized surfacing for the playgrounds and fitness stations.  Address planting palette suggestions for trees, shrubs, and groundcovers, along with their respective locations. Species shall include drought-adaptive and California native plants.  Address irrigation systems and relocation (i.e., smart controllers, control valves, and low-flow drip).  Address hardscape and softscape surfacing materials for the walkways such as PCC concrete and stabilized decomposed granite.
 Address the preservation of trees and/or other noteworthy features.  Address pedestrian circulation.
 Address site amenities, (i.e., tables, benches, trash receptacles, urns and drinking fountains).  Identify infrastructure, (i.e., electrical and storm drainage).  Address low retaining walls and seat walls
 Address ADA-accessible pathways and path of travel.
 Address area lighting.
 Address the hazardous materials locations within the park site.

Page 175 of 616 ends

Design Phase Engineering Services for the
Preparation of PS&E for the Cudahy Park Renovation
City of Cudahy
14 Willdan will submit the design development plan design to the City for review and comments. Upon the review and comments from the City staff, Willdan will present a final site design development plan design for final review and acceptance that addresses the comments from all parties. The construction documents for the improvements will not commence until the City has reviewed and accepted the final design development plan design.

All illustrative renderings and drawings submitted will be in a form suitable for public presentations such as City and stakeholders' meetings.

Preliminary Opinion of Probable Cost Estimation and Construction Schedule. Based on the City-accepted design development plan, Willdan will prepare a detailed cost estimate for the categories of work to be performed in construction. If the cost estimate exceeds the available funding, Willdan will make the necessary revisions and adjustments to meet the financial limitations of the City. Once the City reviews and accepts the opinion of probable costs, Willdan will proceed with the preparation of the final construction documents.

Based on the scope of work depicted on the City-accepted construction opinion of probable costs, Willdan will prepare an estimated project schedule for construction. Milestones for the schedule shall include the bidding period, bid opening, award of project, preconstruction/kick-off meeting, start of construction, the midpoint of construction, final construction, closeout and notice of completion.

Final Construction Drawings, Specifications, and Cost Estimate Construction Documents. This task will be for the entire construction document package encompassing specific plans drawn to a measured scale with construction notes that provide clear direction for the contractor. The package will include technical specifications with special provisions in "Greenbook" format (Standard Specifications for Public Works Construction, current edition the City has adopted), and a final detailed engineer's estimate. The plans, specifications, and estimate (PS&E) will be prepared and submitted to the City at four stages – 30 percent, 60 percent, 90 percent, and final 100 percent. The construction document package will be completed in a form sufficient for the solicitation of competitive public bidding.

The construction documents shall address the requirements of governing agencies. In addition, Willdan shall obtain approvals from governing agencies prior to advertising of public bidding. If any of the permitting agencies require lengthy submittal processes, Willdan shall alert the City of a potential slowdown or stoppage of the project.

Our scope of work for the improvements includes:

1. Prepare detail sheets with the required cross sections and details, including conformance with accessibility requirements for ADA path of travel.

2. Prepare a demolition plan for the removal of existing improvements and existing trees, shrubs, etc. conflicting with proposed improvements.

3. Prepare a grading plan for the playground and fitness stations surfacing, shade shelter and community stage locations, skate park, seat walls, PCC sidewalks, and elevations for compliance with accessibility requirements, and for proper drainage.

4. Prepare a site amenities plan showing the locations/placements of the benches, tables, shade shelters, community stage, fitness stations, drinking fountain, and trash receptacles.

Page 176 of 616 ends

Design Phase Engineering Services for the
Preparation of PS&E for the Cudahy Park Renovation
City of Cudahy
15 5. Prepare the landscape and irrigation modification plans.

6. Prepare a playground and fitness stations layout plan with associated details.

7. Prepare the electrical plans for the lighting layout.

8. Prepare a Soil Management Plan for the hazardous materials areas.

The project will include the following submittals and deliverables. The deliverables will be in electronic form (PDF format) and paper hard copies in full-size 24-inch by 36-inch sheet size.

Preliminary Plans, Specifications and Estimates at 30, 60 and 90 Percent Stages.

Preliminary plans, specifications and cost estimate will be prepared in conformance with the approved design development plan. These documents will be prepared in AutoCAD (and converted to PDF format) and submitted to the City and other responsible parties/governing agencies for preliminary review and acceptance.

Final Plans, Specifications and Estimates at 100 percent Stage. Following the review and acceptance of the 30, 60 and 90-percent stages, Willdan will adjust the plans, specifications, and cost estimate to conform to plan check requirements and comments of the City. The final construction PS&E will be completed in detail and submitted to the City and responsible parties/governing agencies for review and final acceptance, including the city building department and governing fire department. The contract documents will be completed in a form sufficient for the solicitation of competitive public bids, along with all permit compliances. Willdan shall advise the City of any adjustments to previous estimates of probable construction cost indicated by changes in requirements or general market conditions. The final submittal and deliverable materials will include:
 100-percent construction plans stamped by the landscape architect, civil and electrical engineers, and structural engineer as required.
 100-percent technical specifications and special provisions including bid items schedule and city boilerplate specifications
 Final engineer’s estimate including bid items unit cost.

A summary of anticipated plans for the construction document package will include:
 Title sheet with vicinity map, general notes, signature and approvals blocks, legend, sheet index, and utility contact information.
 Detail sheets with construction notes – scale as required  Civil/grading improvement plans – 20 scale
 Typical sections and details – scale as required
 Erosion control plan – 20 scale
 Demolition plan – 20 scale
 Construction layout plan – 20 scale
 Playground equipment and fitness equipment layout plan and details – 10 scale  Skate Park – 20 scale
 Splash Pad – 20 scale
 Utility plan (sewer, water and electrical) – 40 scale  Planting and irrigation modification plans – 20 scale  Hardscape layout and site amenities plan – 20 scale
 Architectural plans for the pre-engineered shade shelters and community stage shelter – 1/8 scale
 Electrical and lighting plans and details – 20 scale

Page 177 of 616 ends

Design Phase Engineering Services for the
Preparation of PS&E for the Cudahy Park Renovation
City of Cudahy
16  Property/topographic survey
 Water quality and LID plan – 20 scale
A summary of anticipated specifications and reports for the construction document package will include:
 Construction specifications with special provisions and technical specifications.  Construction cost estimate.
 Geotechnical report (for the shade shelter, community stage, infiltration rates and general pavement installations).
 LID Report.
 Drainage Report.
 Soil Management Plan.

Constructability Review. Willdan will provide a constructability review of the project as part of the design process. This review is a standard quality control measure used by Willdan to help prevent change orders. This review will include a) performing a job walk, reviewing the existing improvements, and identifying potential conflicts, including pedestrian, access, utilities, and right-of-way issues, and b) reviewing the design and specifications to identify potential construction issues.

Deliverables.

A summary of anticipated deliverables for the plans, specifications and cost estimate ready for bidding includes:
 One wet-signed mylar plan set.
 Six hard copies wet signed.
 AutoCAD files of plans.
 Microsoft Word file of Specifications.
 Excel file of cost estimates.
 PDF files of all other documents.

Bid Support Services
Bidding Assistance. Willdan will be available throughout the bid period to review and respond to questions and provide analysis and interpretation of the drawings and specifications.

Willdan will provide the City with the following items during the bidding period:
 Attend one pre-bid meeting.
 Respond to questions during the project advertising phase.  Assist with the preparation of addenda.
 Assist with reviews of "or equal" products prior to bid opening.  Review and analyze bid results and prepare bid summary.  Verify contractor's references, and contractor's license.  Provide recommendations to award project

Page 178 of 616 ends

Design Phase Engineering Services for the
Preparation of PS&E for the Cudahy Park Renovation
City of Cudahy
17 Construction Support Services
Willdan will be available to provide the analysis and interpretation of the drawings and specifications, review and respond to material submittals and review shop drawings for compliance with the contract.

We have assumed twenty material submittals and fifteen request for information (RFI) requests.  Shop Drawings Review - Willdan will review the contractor's shop drawings, material submittals and respond to requests for information (RFI). The shop drawings and submittals will be logged in once we received them and a project file setup for record-keeping and tracking purposes.

Turnaround time for the reviews will be between 5-7 working days, depending on the complexity of the submittal.

Additional Construction Support Services
Willdan will assist the City during the construction phase by attending a pre-construction meeting.

Additionally, Willdan can assist the City with reviewing change orders and prepare project bulletins.

Furthermore, Willdan will be available for a pre-final and final acceptance observation walk-through with associated punch list items and the preparation of as-built record drawings. Our services are described in detail below:
 Acceptance Inspection (Punch List) - Willdan will perform a pre-final walk-through and followup with a final check of the project to ensure that the work is completed as intended, along with assisting the City in obtaining required turnover items. A punch list (at the pre-final and final) will be prepared by Willdan prior to final acceptance by the City.

As-Built Record Drawings - Willdan will review and approve the contractor's as-built drawings. In preparing the record drawings, Willdan will take the original construction drawings (and any bulletins issued during construction and redlines by the contractor) and make drafting notations to reflect as-built conditions and submit to the City as record drawings. The final deliverables will be on mylar plan sheets.

EXCLUSIONS
 Perform hazardous materials (asbestos, lead paint, aerially deposited lead, etc.) testing and related services.
 Plan check, permit, or similar fees to governmental agencies.  Removal or treatment of hazardous materials encountered on or at the site.  Acoustic analysis, reports, design, or consultation by an acoustical consultant.  SWPPP - Note, this document will be noted in the construction documents to be prepared and furnished by the awarding Contractor.

Page 179 of 616 ends

Design Phase Engineering Services for the
Preparation of PS&E for the Cudahy Park Renovation
City of Cudahy
18 3. Proposed Project Specific Staff
Organizational Chart
Willdan’s organization is shown below. Our team brings significant experience in park planning, sports facilities, recreational developments, residential, streetscape and urban beautification projects; as well as regional, community, and neighborhood parks.

Project Staffing
Willdan proposes to assign Mr. John Hidalgo, RLA, as Project Manager and Principal Landscape Architect. Mr. Hidalgo has over 31 years of diverse experience in park design, urban streetscapes, and a full range of landscape architectural projects. Mr. Hidalgo has completed numerous recreational projects in Southern California, including a variety of special facilities. His experience includes the development of an 8-acre Salud Park in the City of Paramount, California. The park consists of multi-use trails, planting areas with California native vegetation, play fields, exercise stations, 400-meter rubberized track, restroom buildings, picnic shelters, parking lot and playgrounds. In the Town of Pahrump, Nevada, Mr. Hidalgo was the Project Manager for a Draft Master Development Plan for Last Chance Mountain Park. The park consists of 1,520 acres in Bureau of Land Management property. The

Page 180 of 616 ends

Design Phase Engineering Services for the
Preparation of PS&E for the Cudahy Park Renovation
City of Cudahy
19 master plan document includes park general standards/details for mapping of trails, equestrian facilities, restrooms, points of interest signage, hiking markers and information kiosks.

Another project was the 22-acre Fountain Valley Recreation Center Expansion and in the City of Blythe, prior to employment with Willdan, Mr. Hidalgo was the landscape architect responsible for the design of the 18-acre Quechan Regional Park adjacent to the Colorado River. The project included city and local governing agencies (Bureau of Land Management and Palos Verdes Water District) review and approvals, construction drawings, cost estimates and construction observation. The park consists of trails, a new roadway into the park, parking lots, picnic shelters, a restroom building, soccer/baseball fields, regional-specific planting material, a beach area along the river’s edge, large open lawn areas and a future water park area.

As Project Manager, Mr. Hidalgo will:
 Establish appropriate organizational staffing to best provide the services needed;  Monitor, review and report on the project’s status to the City at regular intervals;  Participate in presentations to the City and other stakeholders;  Solicit information from and coordinate reviews by the City;  Be the primary contact and focus of project correspondence in order to maximize communications between the City, other agencies, and the Willdan team; and  Monitor the general progress of the project and will thoroughly review all major documents prior to submittal to the City.

As the project manager, Mr. Hidalgo will ensure that Willdan’s staff is efficiently utilized and dedicated to fulfilling the desires of the City. Mr. Hidalgo will monitor the general progress of the project and will thoroughly review all major documents prior to submission to the City. His responsibilities will include administrative supervision of the project and quality assurance.

Mr. Hidalgo’s background is a blend of public and private practice. He is experienced in park planning, sports facilities, recreational developments, residential, streetscape and urban beautification projects; as well as regional, community, and neighborhood parks. His experience extends from project planning and development through design, construction and maintenance. This broad base of experience, which is specifically relevant to expected project requirements, provides the necessary credentials to guide your projects through various phases and tasks to a successful completion.

Summary qualifications of the Willdan team are presented on the following pages. Our subconsultant team is introduced below.

Subconsultants
M Y Engineering, Inc. (Electrical and Lighting Design – Splash Pad, Community Stage, Sports Courts and Play Fields) is a professional consulting engineering firm providing full mechanical, electrical, plumbing (MEP) engineering services. The firm applies a full-service approach to a wide variety of sectors, including recreational facilities, commercial buildings, educational institutions, industrial buildings, residential areas, health care facilities, and government establishments. M Y Engineering has provided on-call engineering services to the City of Rosemead, City of Monrovia, City of Covina and County of Los Angeles Internal Services Department (responsible for Beaches and Harbors, Fire Department, Health Services, Library, Parks & Recreation, Probation, Registrar-Recorder / County Clerk, Sheriff, and Superior Courts). The firm

Page 181 of 616 ends

Design Phase Engineering Services for the
Preparation of PS&E for the Cudahy Park Renovation
City of Cudahy
20 recently completed work on an amphitheater power and lighting system with new park lighting for the City of Covina.

ELMT (Contaminated Soils) has 50+ years of experience providing timely and cost-effective environmental solutions and planning services. The firm provides biological resource assessments, Biological Resources Studies, Jurisdictional Delineations, Cultural/Historical/Archeological & Paleontological Studies, Climate Change/Air Quality/Greenhouse Gas (GHG) Studies, Transportation & Traffic Studies, Noise Studies, Health Risk Studies, Phase I and Phase II Environmental Site Assessments, Arborist Studies, Light/Glare Studies, Energy Analyses, and Environmental Remediation Planning and Project Management. ELMT has worked with Mr. Hidalgo on previous projects and is highly qualified to perform the respective services.

Spohn Ranch (Skate Park Design) is an award-winning skate park design-build firm with 30 years of municipal skate park projects spanning 40+ states in the nation. With a firsthand passion for skateboarding and wheel sports, Spohn Ranch’s highly skilled designers, and craftsmen – including iron workers, grading wizards and ACI-certified shotcrete nozzlemen – pride themselves on designing and building skate parks. The firm has won numerous awards for its skate parks including:
 Award for Excellence in Design, 2020 (Manzanita Skate Park - Anaheim, CA), California Park and Recreation Society
 Project of the Year, 2017 (Marine Park Skate Park – Manhattan Beach, CA), APWA Southern California Chapter
 Award of Excellence in Park Planning, 2017 (Stanton Skate Park – Stanton, CA), California Park and Recreation Society
 Finalist for “Crews that Rock” Award, 2011 & 2013 (Dew Tour Bowl & BSA Summit), World of Concrete
 Award for Excellence Nominee, 2010 (Daybreak Skate Park – South Jordan, UT), American Society of Landscape Architects
 Award of Excellence for Recreation, 2009 (Fontana Skate Parks – Fontana, CA), California Park and Recreation Society
 The Future of Skatepark Design,” 2008 (Daybreak Skate Park – South Jordan, UT), Huck Magazine
AWu Government Services (Architectural Design – Community Stage) is a full-service architectural firm located in Torrance, California. Since 1956, the firm’s professional staff of architects, planners, and design specialists have completed over 2,000 projects for over 50 different municipalities / public agencies. AWu has designed government facilities for city, county, state, federal, other municipal government agencies, military, and school districts. The firm has designed, produced construction documents and provided construction administration for various projects in the City of Rancho Palos Verdes including Eastview Park and Hesse Park. Since 1987, AWu has worked on more than 40 projects for the City of Torrance.

Page 182 of 616 ends

Design Phase Engineering Services for the
Preparation of PS&E for the Cudahy Park Renovation
City of Cudahy
21 Key Project Team Members
Team Member,
Yrs of Experience, & Role
License/Certifications Qualifications
John Hidalgo, RLA
31 Years of Experience
Project Manager &
Landscape Architect Lead
 Landscape Architect,
California No. 3551
 Licensed Contractor,
California C-27, No. 713613
 BS, Landscape Architecture, California State
Polytechnic University, Pomona, CA
Salvador Lopez Jr.
22 Years of Experience
Technical Advisor &
Environmental Lead
 Advance and Environmental
Planning
 Active Transportation
Planning (ATP)
 BS, Urban and Regional Planning, California
State Polytechnic University, Pomona
Vanessa Muñoz, PE, TE
25 Years of Experience
QA/QC Manager
 Civil Engineer, California No.
67583
 Professional Traffic
Operations Engineer
 Traffic Engineer, California
No. 2341
 Doppler Traffic Operator
 BS, Civil Engineering, California State
Polytechnic University, Pomona
Bryan Nguyen, RLA
19 Years of Experience
Landscape Architect
 Landscape Architect,
California No. 4967
 BS, Landscape Architecture, California State
Polytechnic University, Pomona, CA
Carlos Espinoza, RLA
13 Years of Experience
Landscape Architect
 Landscape Architect, California
No. 6534
 BS, Landscape Architecture, California State
Polytechnic University, Pomona, CA
 Skills Certificate in Geographical Information
Computer Systems (ArcGIS 9.2), Mt. San
Antonio College, Walnut, CA
Tyrone Peter, PE
16 Years of Experience
Civil Engineering Lead
 Civil Engineer,
California No. 81888
 BS, Engineering and Civil Engineering, Tamil
Nadu College of Engineering
 Civil Engineering, Murugappa Polytechnic
Gary Gordon, PE
37 Years of Experience
Structural Engineer
 Civil Engineer, California No.
42176
 BS, Civil Engineering, California State
University, Chico
Ross Khiabani, PE, GE
47 Years of Experience
Geotechnical Engineer
 Civil Engineer, California No.
37156
 Geotechnical Engineer,
California No. 2202
 MS, Geotechnical Engineering, California State
University, Long Beach
 Geology, Pahlavi University, Iran

Page 183 of 616 ends

Design Phase Engineering Services for the
Preparation of PS&E for the Cudahy Park Renovation
City of Cudahy
22 Team Member,
Yrs of Experience, & Role
License/Certifications Qualifications
David Woolley, PLS
31 Years of Experience
Survey
 Professional Land Surveyor,
California PLS No. 7304
 Survey & Mapping Coursework at Santiago
Canyon College
 Courses: Ethics, Business & Professions Code,
ALTA/NSPS Courses, Copyright Law and Land
Surveying
Diane Rukavina, PE
36 Years of Experience
Grant Funding
 Civil Engineer, California No.
36380
 BS, Civil Engineering, Loyola Marymount
University
Jeffrey Lau, PE, TE, ENV SP
19 Years of Experience
Traffic Engineering Lead
 Civil Engineer, California No.
83887
 Traffic Engineer, California No.
2835
 Doppler Radar Operator
 BS, Civil Engineering Polytechnic State
University, Pomona
Kevin Custado, EIT, ENV SP
8 Years of Experience
Electrical (Site Lighting)
 Engineer-in-Training, California
No. 153964; Envision
Sustainability Professional
 BS, Civil Engineering, California Polytechnic
State University, Pomona

Page 184 of 616 ends

Design Phase Engineering Services for the
Preparation of PS&E for the Cudahy Park Renovation
City of Cudahy
23 Resumes
Salvador Lopez Jr.

Technical Advisor and Environmental Lead
Profile Summary
Education:  BS, Urban and Regional Planning, California State Polytechnic University, Pomona Experience: 22 Years
Mr. Salvador Lopez possesses planning expertise and experience spanning all aspects of planning, including current, advance, and environmental planning, as well as active transportation planning and housing and community development. He is highly experienced at managing multi-disciplinary teams in the development of policy and long-range planning documents for public agencies. Mr. Lopez has provided planning services to the City of Cudahy since 2017. In his capacity as Interim Community Development Director, Mr. Lopez has successfully maintained the stability of the department while the city recruited a permanent Director. During the last five-plus years, Mr. Lopez has shepherded the adoption of the General Plan and Zoning Code update, successfully acquiring grant funding to support the update to the city’s Housing Element and the adoption of an Inclusionary Housing Element. He continues to assist the City with their Successor Agency needs, and was instrumental in the City’s pursuit of Proposition 68 funding for the proposed improvements to Cudahy Park. Mr. Lopez’s institutional knowledge of the city, experience in grants administration and environmental expertise make him a key asset to this project.

Relevant Project Experience
Contract Planning Services, City of Cudahy, California. Project Manager responsible for overall project management and oversight for staffing resources provided to the City. Willdan provides full-time contract planning services for the City's Planning Division as well as for Interim Community Development Director.

On-Call CEQA/NEPA Planning Services, City of Claremont, California. Project Manager responsible for overall project management and oversight for CEQA/NEPA documentation services necessary to implement the City's planned developments. Willdan's planning project managers prepare environmental documents pursuant to CEQA and NEPA and other environmental documentation or technical studies and assist with securing and complying with required regulatory permits. The range of environmental documents encompasses initial studies, negative/mitigated negative declarations, and environmental impact reports pursuant to CEQA, categorical exclusions, environmental assessments/findings of no significant impacts, and environmental impact statements pursuant to NEPA.

Contract Planning Services, City of Long Beach, California. Project Manager responsible for overall project management and oversight for staffing resources provided to the City. Staff planners assist with current planning, advance planning, special projects planning, development project review, entitlement processing, CEQA document preparation and review, historic assessments, community outreach, and other long-range planning activities.

Contract Planning Services, City of Ojai, California. Project Manager responsible for overall project management and oversight for staffing resources provided to the City. Staff planners assist with day-today current planning activities, design review, entitlement processing, counter assistance, and environmental review. Willdan is providing on-call planning services – including contract staff augmentation – to assist the Planning Division with general current planning activities.

Page 185 of 616 ends

Design Phase Engineering Services for the
Preparation of PS&E for the Cudahy Park Renovation
City of Cudahy
24 On-Call Current Planning Services, City of Elk Grove, California. Project Manager responsible for overall project management and oversight of planning services provided to the City. Assigned planners will be responsible for on-call current planning services for all types of projects requiring entitlements, including – but not limited to – conditional use permits, variances, design reviews, rezones, zoning and general plan amendments, and tentative subdivision maps.

On-Call Planning Services, City of Desert Hot Springs, California. Project Manager responsible for overall project management and oversight of on-call planning services provided to the City. Contract planning services emphasize discretionary case processing and long-range advanced planning programs.

Programs involved land use planning; complex land use development projects; general administration of City-initiated planning work and studies; conceptual plans; land use entitlement applications; general plan, specific plan, and zoning code updates and map amendments; and initial studies under the California Environmental Quality Act and related environmental documents. As-sociated staff reports, resolutions, and ordinances were prepared and presented as needed.

Special Project Planning Services, City of Artesia, California. Project Manager responsible for overall project management and oversight of on-call planning services provided to the City. Contract planning services encompass re-viewing and processing land use entitlement applications; preparing general plan text or map amendments; preparing or amending specific plans; preparing zoning code text or map amendments; and preparing related environmental studies. Performance of these responsibilities requires expertise and knowledge in general plan compliance and implementation, CEQA/NEPA conformance, project management, and general planning procedures.

On-Call Planning Services, City of Willows, California. Program Manager responsible for overall on-call project assignment management and oversight for staffing resources provided to the City. Staff planners assist with current, advanced, and special project planning; development project review; entitlement processing, including general plan and zoning amendments; CEQA document preparation and review; and other long-range planning activities.

Garfield Avenue Corridor Improvements, City of Paramount, California. Environmental Task Manager responsible for overall environmental services necessary for the street improvements. Willdan provided design engineering services for street improvements through the Garfield Avenue corridor between the North and South City limits. The design involved street widening to accommodate a third lane in each direction; street resurfacing; two concrete intersections; concrete sidewalk, curb and gutter, and driveway approach reconstruction; catch basin construction; streetscape improvements for raised landscaped medians and modifications to existing medians; two entry monument signs; and traffic signal modifications at nine locations along the Garfield Avenue corridor. Services included civil, traffic, and drainage engineering; survey and mapping; utility relocation; landscape architecture; and pavement management. Willdan prepared an initial study checklist and a mitigated negative declaration pursuant to CEQA requirements.

Firestone Boulevard Corridor Capacity Enhancement, City of South Gate, California. Environmental Task Manager responsible for overall environmental services necessary for the street improvements.

Willdan provided engineering services for the complete rehabilitation of roadway improvements from Alameda Street to Hunt Avenue. Improvements included but are not limited to increasing the number of lanes from 4 to 6, pavement rehabilitation along with localized removal and replacement of the failed portions of the roadway; installation of landscaped and hardscaped medians with drought-resistance plants, irrigation system, and lighting system; reconstruction of any deficient sidewalk, curb and gutter, driveway approaches, non-compliant ADA curb ramps; and street parkway trees without irrigation.

Page 186 of 616 ends

Design Phase Engineering Services for the
Preparation of PS&E for the Cudahy Park Renovation
City of Cudahy
25 John J. Hidalgo, RLA
Project Manager and Landscape Architecture Lead
Profile Summary
Education:  BS, Landscape Architecture, California State Polytechnic University, Pomona  Summer of 1987, European Study Tour, California Polytechnic State University, School of Architecture, Pomona
Registration:  Landscape Architect, California No. 3551  Licensed Contractor, California C-27, No. 713613 (inactive) Experience: 31 Years
Mr. John Hidalgo possesses in-depth expertise in landscape architecture design development, preparation of plans and specifications, plan reviews, and construction observation. Mr. Hidalgo is familiar with various local, state, and federal codes, regulations, procedures, and standards relating to construction, safety, park and facility planning, and other landscape and irrigation amenities. He has successfully completed projects in compliance with these various standards. Mr. Hidalgo has experience representing project owners during the plan review process. He possesses comprehensive experience in both field observation and construction. Mr. Hidalgo responsibilities include managing park and street beautification design, stormwater management/low-impact developments, plan reviews, and construction observation.

Relevant Project Experience
Salud Park, City of Paramount, CA. Project Manager. Willdan was involved with this 8-acre park project from the very beginning of planning, through the grant application submittal and the preparation of construction documents and construction management services. The project includes synthetic turf play fields, a 400-meter walking/running track, multi-use soft-footed trails, exercise stations, parking, security lighting, and enclosed decorative steel fencing for the entire park. The park development is located within Southern California Edison right-of-way, therefore went through a lengthy review process and adhered to all requirements set forth in SCE conditions of approval. Funding for this park development was available through a park grant from Proposition 84.

La Puente Park Beautification Project, Paramount, California. Project Manager. Willdan provided landscape architecture design services involving the enhancement of an existing community park. The park is estimated at 20 acres and encompasses a variety of activities such as baseball, softball and football fields, playgrounds, open lawn areas, a community center, picnic shelters, restrooms, and City maintenance yard. The new additions include an expanded decorative concrete promenade area for the softball and little league fields, parking lot reconfiguration, ballfield lighting, shade trees, benches, pedestrian lighting and a new landscape and state-of-the-art irrigation system. Willdan is currently providing construction management and inspections.

Recreation Center Master Plan Expansion, Fountain Valley, California. Project Manager. Responsible for the rehabilitation of an existing 55-acre sports complex and an addition of 23 acres to produce a new 78-acre regional sports facility. The project provides the community with six new softball fields, six Little and Pony League fields, four soccer fields, a utility field, a large concert-in-the-park and assembly area, two new concession/restroom buildings, a new maintenance building and over one mile of natural hiking trails that connect to the existing County hiking trail system in Mile Square Park. The new improvements add to the existing tennis courts, indoor and outdoor basketball courts, handball and racquetball courts and recreation building.

Page 187 of 616 ends

Design Phase Engineering Services for the
Preparation of PS&E for the Cudahy Park Renovation
City of Cudahy
26 Riverfront Park, City of Maywood, California. Project Manager/Landscape Architect. Responsible for the design and preparation of construction documents and specifications of a 7.3-acre park. Portions of the land were considered “Brown Fields” (contaminated soil). A thorough remediation program administered by the Environmental Protection Agency allowed the reclamation of the land for public use. Development of the park includes restroom facilities, retaining walls, landscaping, sidewalks, bicycle paths, a staging area for those using the Los Angeles River bicycle trail, a bridge, trails, a demonstration garden, lawn and picnic areas, a basketball court, a soccer field, and the incorporation of a swale to add to a natural habitat setting and aid in the control of runoff.

Orange Line Extension, Metropolitan Transportation Authority. Task Manager. Responsible for providing landscape design for this design-build project for the 4-mile extension of the rapid bus line along Canoga Avenue. Scope included preparation of arborist report, tree inventory plans, tree replacement plans, planting and irrigation plans as well as coordinating all landscape and irrigation aspects for the implementation of the design-build process. Site work included, a multi-purpose trail, raised landscaped medians, an irrigation system, ADA Access curb ramps, bio-retention basins, bicycle paths, park and ride and parking lot facilities.

Urban Greening Bicycle Trail, City of Lynwood, California. Landscape Architecture Task Manager responsible for providing and overseeing all landscape and irrigation design required to develop a sustainable, integrated, and efficient design for a bicycle trail within the community consistent with the City's year-round recreational programs. The $2.85 million, 1.2-mile project improvements are being designed to meet the City's general plan objectives and incorporate landscaping and decorative/commemorative points of interest along the trail. The ultimate bicycle path will provide safe connectivity between parks, bus and light rail transit stops, city hall, and other City attractions and shopping areas. Willdan is providing full engineering design services encompassing field surveys, rightof-way engineering, geotechnical engineering and inspection, landscape architecture, environmental documentation, preliminary and final design, drainage and water quality, utility coordination, traffic design, and safety and visibility lighting design.

Lakewood Boulevard Regional Corridor Capacity Enhancement, City of Lakewood, California.

Landscape Architecture Task Manager responsible for providing and overseeing all landscape and irrigation design required for complete street/green street improvements between the north city limits and Del Amo Boulevard. Improvements involved street widening and median improvements; Class II bike lanes in both directions; turn lanes; landscape planting and irrigation; overhead distribution and transmission power undergrounding; sidewalk, curb and gutter, and driveway approach reconstruction; street resurfacing; catch basin construction; stormwater quality improvements to comply with Green Streets policy; bike lockers, bus shelter, and traffic signal modifications. Services include civil, traffic, pavement, drainage, and geotechnical engineering; landscape architecture, survey and right-of-way engineering, and utility coordination and relocation.

Paramount Boulevard Urban Renovation and Complete Street Improvements, City of Paramount, California. Landscape Architecture Task Manager responsible for providing and overseeing all landscape and irrigation design required for street improvements necessary to transform Paramount Boulevard from a four-lane arterial roadway into a scenic, multi-modal complete street corridor lined with shade trees and LED lighting to foster a more walkable and vibrant downtown atmosphere. The improvements involved traffic-calmed vehicle lanes with bulb-outs, two mid-block pedestrian crossings enhanced with rectangular rapid flashing beacons, a new traffic signal, LED street and pedestrian lighting, a parklet, bus shelters, new sidewalks, monument signs, and drought-tolerant streetscaping.

Page 188 of 616 ends

Design Phase Engineering Services for the
Preparation of PS&E for the Cudahy Park Renovation
City of Cudahy
27 Vanessa Muñoz, PE, TE
QA/QC Manager
Profile Summary
Education:  BS, Civil Engineering, California State Polytechnic University, Pomona Registration:  Civil Engineer, California No. 67583
 Professional Traffic Operations Engineer
 Traffic Engineer, California No. 2341
 Doppler Traffic Operator
Experience: 25 Years
Ms. Vanessa Muñoz is an accomplished engineer for multi-discipline and multi-agency traffic and transportation projects and has designed over 1,000 signalized intersections and supervised the completion of over 2,000 projects for a variety of large- to small-scale projects. She has 25 years of traffic engineering and transportation planning experience in traffic impact studies, engineering and traffic surveys, design and operations, municipal engineering, and operational analyses. Ms. Muñoz is responsible for the analysis, coordination, and preparation of plans, specifications, and estimate for traffic signals, signing, striping, traffic control, flashing beacons, street lighting, interconnect, parking lots, street widening and resurfacing projects. She has performed street lighting inventories for master plans, developed design plans and performed energy audits for street lighting conversions and street lighting upgrades. Ms. Muñoz serves on an on-call basis as the City Traffic Engineer for the Cities of Rolling Hills and Inglewood and has served in a traffic engineer capacity or as City Traffic Engineer for the Cities of Arcadia, Camarillo, and Fontana.

Ms. Muñoz has secured funding through the Safe Routes to School (SR2S) and Highway Safety Improvement Program (HSIP) grants and has managed projects that include federal funds such as SRTS, HSIP, ARRA, STIP, and STPL. She is extremely familiar with the Local Assistance Procedures Manual and has coordinated the approval of NEPA/CEQA, understands the procedures for allocation of construction funds and issuance of the E-76 form.

Relevant Project Experience
Palos Verdes Drive North Bike Lane, City of Rolling Hills Estates, California. Project Manager responsible for securing federal STPL funds in the amount of $2,081,000 (Call for Projects Grant) and state fund in the amount of $554,580 (SR2S Grant) that will serve as the local match for the design and construction of the Palos Verdes Drive North Bike Lanes between Crenshaw Boulevard and the West City Limits. Willdan Engineering provided engineering and construction engineering services to the City of Rolling Hills Estates for the Palos Verdes Drive North Bike Lane Project. The design aspect of the project included the roadway widening approximately 1.26 miles long for the addition of 5-foot bike lanes within a 200-foot right-of-way, as well as the addition of a second through lane at major intersections to increase capacity. The improvements included the installation of raised medians, street resurfacing and traffic signal modifications. Other services provided by Willdan Engineering and essential to the success of the project included utility coordination/relocation, federal funding administration; environmental clearance (NEPA and CEQA); contract administration and construction inspection.

Richmond Road Bike Path, City of Ridgecrest, California. Lead Traffic Engineer. Lead Traffic Engineer for the design of a new Class I bike path on Richmond Road between Ridgecrest Blvd and the Bowman Bike Path. Willdan provided professional engineering and environmental compliance services for the

Page 189 of 616 ends

Design Phase Engineering Services for the
Preparation of PS&E for the Cudahy Park Renovation
City of Cudahy
28 extension of the existing Class I Bowman Bike Path along Richmond Road from the existing bike path (north of Upjohn Avenue) to Ridgecrest Boulevard.
12 Park Lighting Analysis, City of Norwalk, California. Project Manager. Willdan Engineering provided professional energy and engineering services for the lighting analysis and audit on 12 parks in the City of Norwalk. The City is interested in retrofitting the existing parks’ lighting fixtures in order to reduce the energy consumption throughout the parks, as well as supplementing the existing lighting with additional lighting to improve safety in and around the parks and reduce crime. Furthermore, three parks have ballfields that are not currently lit and the City is requesting a lighting analysis be performed to assess how much it would cost to install energy-efficient ballfield lighting. Willdan Energy will perform Park Lighting Energy audits that will meet or exceed the minimum requirements of ASHRAE energy audit guidelines (RP-669). For sites where it is not appropriate or customary to include certain elements and/or deliverables outlined in the ASHRAE Level 2 audit (for example, pools and sports complexes), it is allowable to not address all specified components and deliverables noted in the audit description.

Drummonds Avenue Widening Project (HSIP), City of Ridgecrest, California. Project Manager.

Responsible for providing engineering services to perform environmental, design engineering, and federal compliance services for the City’s Drummond Avenue Widening project. The project includes the design of new curb, gutter, sidewalks, crosswalks, ADA curb ramps, asphalt concrete paving, signing and striping along Drummond Avenue between Downs Street and Inyo Street. We understand that the proposed improvements are funded by the Highway Safety Improvement (HSIP) federal programs and require the services of a consultant with expertise in the management of federally-funded projects. The grant amount is $293,000. The Drummond Avenue widening will provide two lanes of travel for each direction and will align with the existing cross section at Downs Street and Inyo Street. Willdan prepared the NEPA Categorical Exclusion with technical studies including hazardous material, biological resources and cultural studies. The CEQA was a negative declaration or mitigated negative declaration documents. The grant paperwork included preliminary engineering, field review and right of way certifications. Other services provided by Willdan included geotechnical study and utility coordination.

Firestone Boulevard Capacity Enhancement, City of South Gate, California. California. Project Manager. Responsible for traffic engineering design and studies required for the corridor improvements from Alameda Street to Hunt Avenue. The improvements involved roadway widening from four to six lanes; pavement rehabilitation; landscape and hardscape medians; median lighting; sidewalk, curb and gutter, and driveway approach reconstruction; ADA-compliant ramps; parkway trees; artistic elements and corridor entrance monument; bus shelter and bus turnouts; and traffic signal modifications.

Services provided included civil, traffic, pavement, and drainage engineering; landscape architecture, survey and right-of-way engineering; and utility relocation.

Lakewood Boulevard Regional Corridor Capacity Enhancement, City of Lakewood, California. Project Manager. Responsible for oversight of traffic engineering services provided for 1½-mile complete street/green street improvements between the north City limit and Del Amo Boulevard to provide for a regional bicycle path in compliance with the Gate-way Council of Governments Active Transportation Plan and improve pedestrian access to retail/commercial establishments. The design entailed coordination of pedestrian and bicycle movements into the current County Traffic Signal Synchronization Program, undergrounding utility distribution and transmission, Green Streets stormwater quality treatment, and drought-tolerant landscaping. Other improvements involved upgraded traffic signal equipment to improve safety, bicycle parking and lockers, improved transit stops, sidewalk additions within the corridor to meet ADA requirements, street resurfacing, and irrigation.

Page 190 of 616 ends

Design Phase Engineering Services for the
Preparation of PS&E for the Cudahy Park Renovation
City of Cudahy
29 Bryan Nguyen, RLA
Landscape Architectural
Profile Summary
Education:  BS, Landscape Architecture, California State Polytechnic University, Pomona  Street Tree Seminars
Registration:  Landscape Architect, California No. 4967 Experience: 19 Years
Mr. Bryan Nguyen has over 19 years of landscape architecture and graphic design experience. Mr.

Nguyen's experience includes the development of conceptual landscape plans with extensive graphic vignettes such as photographic before and after simulations; the preparation of construction documents; and plan checking services for many public agencies. Mr. Nguyen is proficient in AutoCAD, MicroStation, SketchUp Pro, LandFX, and Adobe Photoshop. Other duties include the preparation of irrigation water and landscape management construction documents and performing third-party landscape plan reviews.

Relevant Project Experience
As-Needed Landscape Architecture Staff Augmentation for the Los Angeles County Department of Public Works, Design Division. Landscape Architect. Willdan provided landscape architectural staff augmentation services to the Los Angeles County Department of Public Works, Design Division. Duties include assisting the County’s landscape architect project manager with various tasks, e.g. construction documentation preparation, conceptual exhibits preparation, construction plan and specification reviewing etc.

Prop 84 Implementation Grant Application, City of Lakewood, CA. Grant Application Preparer.

Willdan was retained to assist in the preparation of Prop 84 Implementation Grant Application related to water conservation in the landscape. Grant funding paid for the conversion of existing turf medians to drought-adaptive low water use landscape. Scope of work included project information questionnaire, a Powerpoint presentation, cost estimates and view simulations of the proposed improvements. The City was awarded the requested $1 million dollars, and the project was completed in the spring of 2020.

Salud Park, City of Paramount, CA. Designer. Funding for this 8-acre park development was through a park grant from Proposition 84. Willdan was involved with this project from the very beginning of planning, through the grant application submittal and the preparation of construction documents.

Willdan also handled the construction management services. The project includes a synthetic turf play fields, 400-meter walking/running track, multi-use soft-footed trails, exercise stations, parking, security lighting, and enclosed decorative steel fencing for the entire park. Willdan went through a lengthy review process and adhered to all requirements set forth in SCE conditions of approval.

Metropolitan Transit Authority (MTA) Right-of-Way (ROW) Multi-Purpose Trail, City of Paramount, CA. Landscape Architect. The project involved the construction of an estimated ½ mile multi-purpose trail consisting of decorative overhead lighting, benches, bollards, landscape and irrigation, trash receptacles, and bicycles racks. The project is located within the MTA ROW easements, from Lakewood Boulevard to Somerset Boulevard. This segment is part of the City’s 2.5 miles of trails within the MTA ROW that are currently in the planning stage and will be constructed when funds are available. Willdan was responsible for the conceptual plans and illustrations, construction documents, and construction support services. As which included the preparation of; and preparation of construction documents.

Page 191 of 616 ends

Design Phase Engineering Services for the
Preparation of PS&E for the Cudahy Park Renovation
City of Cudahy
30 Carlos A. Espinoza
Landscape Architect
Profile Summary
Education:  Skills Certificates in Landscape Irrigation Science and Turf Grass Management Mt. San Antonio College, Walnut, CA
 Skills Certificate in Geographical Information Computer Systems (ArcGIS 9.2) Mt. San Antonio College, Walnut, CA
 BS, Landscape Architecture, California State Polytechnic University, Pomona  Landscape Architecture Study Abroad, Castiglione Fiorentino, Italy  ITALART Associazione Culturale Centro Studi, S. Chiara. Cal Poly Pomona Tuscany, Italy  AA, General Education, Chaffey College, Rancho Cucamonga, California Registration: Landscape Architect, California No. 6534
Experience: 13 Years
Mr. Carlos Espinoza has been involved in the preparation of planting, irrigation, and hardscape construction documents for county and municipal entities, large commercial sites, and custom-built residential. He prepares documents including site inventories documenting existing conditions. Mr.

Espinoza managed and executed planting selection, and coordinated with nurseries for plant availability, and allocation of planting material per availability. He observed the planting process to ensure accurate onsite installation per specifications. He coordinated with outside consultants on multiple aspects of projects, including structural engineers and civil engineers to ensure the timely completion of landscape projects. Mr. Espinoza performed pre-construction and post-construction site visits to ensure that landscape plans, specifications and details are followed. He prepared cost-estimation documents. He is proficient in ArcGIS 9.2, AutoCAD, MS Office Suite, Adobe Photoshop, and Sketch-Up software. Mr.

Espinoza is fluent in the Spanish language, both written and spoken.

Relevant Project Experience
As Needed Landscape Architecture & Engineering Design Services, County of Los Angeles, CA.

Designer. The County of Los Angeles retained Willdan to provide as-needed landscape architectural design services for staff augmentation at the Alhambra office location.

Clarksdale Skate Park Renovations, City of Hawaiian Gardens, CA. Field Observer. Willdan was retained to design a skate park at Clarkdale Park. The skating elements will be a combination of concrete elevated bowls and ramps along with jump boxes and stair rails. Our services include concepts, construction drawings and bidding support.

Quality Control Inspection/Customer Services, City of Yorba Linda, CA. Landscape Architect/Task Manager Assistant. As part of Willdan's current on-call services with the City of Yorba Linda, the City's Landscape Department has requested a landscape Inspection/Quality Control Staff Member to assist with the City's Landscape Maintenance District day-to-day operations. Services include field visits and interaction with contractors and local residents; plans reviewer; construction management services for the renovations of landscape medians to drought adaptive planting material- citywide; additionally, has requested for the preparation of a construction documents for the conversion of city medians to drought adaptive landscapes.

Page 192 of 616 ends

Design Phase Engineering Services for the
Preparation of PS&E for the Cudahy Park Renovation
City of Cudahy
31 Tyrone Peter, PE
Civil Engineering Lead
Profile Summary
Education:  BS, Engineering and Civil Engineering, Tamil Nadu College of Engineering  Civil Engineering, Murugappa Polytechnic
Registration:  Civil Engineer, California No. 81888
Experience: 16 Years
Mr. Tyrone Peter is an accomplished civil engineer for multi-discipline and multi-agency infrastructure projects and is known for providing innovative, quality engineering services to ensure project delivery within budget and schedule. His years of experience managing and designing all types of public works projects provide a solid foundation to understand what is needed to deliver a successful project and make him the perfect fit for overseeing the entire project as well as specific civil engineering tasks. Mr.

Peter's comprehensive experience includes the design of state highway, new street, street widening, street realignment, pavement rehabilitation, light rail and railroad, grade separation, flood control facility, water, and sewer projects. He has supervised feasibility study, project study report, project report, construction document preparation as well as grade certification issuance, construction administration, and construction inspection.

Relevant Project Experience
City of Westlake Village Westlake Village Community Park and YMCA Building, Westlake Village, California. Project Manager. Willdan provided project management design environmental clearance and construction management and inspection services for this multi-phased project to construct a new 20-acre park and YMCA facility. Construction contracts completed for this project encompass mass grading drainage improvements on-site utility installations, three booster pump stations enclosed within new buildings, two concessions, restroom buildings, retaining walls, access roads, a skate park, playground and fitness areas, beach volleyball courts, baseball and soccer fields and a 10,000-squarefoot YMCA building. Overall earthwork involved remediation and cut-and-fill quantities of over 1 million cubic yards of earth. The design involved backbone storm drain infrastructure as well as debris and retention basin. The site utility plan included services for water, sanitary sewer, gas and electric.

Willdan managed the design of MIG Inc. and provided on-site design as necessary for aspects of the work such as ADA-compliant ramp installations, slope landscaping redesign and fire lane permitting.

Willdan procured coordinated and managed dozens of contracts and oversaw all aspects of building and safety water pressure health and safety and construction, acting as the general contractor to support the City Council’s direction to phase the work out and use inventive procurement methods to reduce the cost of installations like grates lighting poles and a gazebo. This state-of-the-art project would be impossible for most cities the size of Westlake Village; but the cohesive commitment by the City Council, City management and City staff added to the dedication and effort of the Willdan team made this amazing park possible.

Urban Greening Bicycle Trail, City of Lynwood, California. Project Manager responsible for overall project management and oversight required to develop a sustainable, integrated, and efficient design for a bicycle trail within the community consistent with the City's year-round recreational programs. The $2.85 million, 1.2-mile project improvements were designed to meet the City's general plan objectives and incorporate landscaping and decorative/commemorative points of interest along the trail. The

Page 193 of 616 ends

Design Phase Engineering Services for the
Preparation of PS&E for the Cudahy Park Renovation
City of Cudahy
32 ultimate bicycle path provides safe connectivity between parks, bus and light rail transit stops, city hall, and other City attractions and shopping areas.

Lakewood Boulevard and Del Amo Boulevard Hot Spot Intersection Improvements, City of Lakewood, California. Project Manager responsible for overall project management and oversight of all services required for the intersection improvements. Improvements encompassed widening the west side of Lakewood Boulevard north of Del Amo Boulevard, modifying/removing the median island on Lakewood Boulevard, widening the south side of Del Amo Boulevard, modifying the median island on Del Amo Boulevard, modifying the traffic signal, relocating street lights per street/median island modifications, box culvert/channel wall modifications, extending Del Amo Boulevard Class 2 bike lanes east of Lakewood Boulevard, and converting a bike path to a recreational path.

Centinela Avenue Median, ADA, and Traffic Signal Improvements, City of Inglewood, California.

Quality Assurance Manager responsible for ensuring services and deliverables required SB-1 and HSIPfunded improvements. The HSIP segment of the project involved installing raised median islands and protected left-turn phasing and upgrading traffic signals between La Cienega Boulevard and La Brea Avenue. The SB1-funded improvements entailed improvements between La Cienega Boulevard and Florence Avenue and involved reconstructing the curb and gutter, resurfacing with asphalt-rubber hotmix; reconstructing damaged and uplifted concrete sidewalk; installing access curb ramps in compliance with ADA requirements; installing landscaping along the parkway; signing and striping; street lighting; and fiber optic interconnects. Both project segments were designed simultaneously and bid as one construction package with two separate bid schedules.

Firestone Boulevard Capacity Enhancement, City of South Gate, California. Project Manager responsible for overall project management and oversight required for the corridor improvements from Alameda Street to Hunt Avenue. The improvements involved roadway widening from four to six lanes; pavement rehabilitation; landscape and hardscape medians; median lighting; sidewalk, curb and gutter, and driveway approach reconstruction; ADA-compliant ramps; parkway trees; artistic elements and corridor entrance monument; bus shelter and bus turnouts; and traffic signal modifications. Services provided included civil, traffic, pavement, and drainage engineering; landscape architecture, survey and right-of-way engineering; and utility relocation.

Alpine Pedal Path, City of Big Bear Lake, California. Project Manager responsible for overall project management and oversight of all services required for the bike path improvements. Providing the separated multi-use trail resulted in safer and more user-inviting travel options. The addition of this path affected the existing Sandalwood Creek. To minimize the impacts to the creek, Willdan designed extended storm drain culverts with head, end, and wing walls added. Additional design elements entailed final alignment grade, drainage, utility relocation coordination, retaining and sound walls, landscape and irrigation, right-of-way acquisition and easement, and legal descriptions and exhibits. The work required coordination with local bus transit and Caltrans District 8.

South Laguna Streetscape, City of Laguna Beach, California. Design Engineer responsible for the preparation of the plans, specifications, and estimate design documents Willdan prepared both the CEQA and NEPA documentation for various aesthetic streetscape and pedestrian safety improvements along Coast Highway in the South Laguna Business District. The work involves the installation of new sidewalks, pedestrian lighting, ADA ramp improvements, landscaping, and bus stop shelters. The preparation of both environmental documents was coordinated with Caltrans District 12 as the project is partially being federally funded through Caltrans’ Local Assistance Program.

Page 194 of 616 ends

Design Phase Engineering Services for the
Preparation of PS&E for the Cudahy Park Renovation
City of Cudahy
33 Gary Gordon, PE
Structural Engineer
Profile Summary
Education:  BS, Civil Engineering, California State University, Chico Registration:  Civil Engineer, California No. 42176
Experience: 37 Years
Mr. Gary Gordon possesses comprehensive public works experience that encompasses project management; design and construction management of roadway, bridge, traffic signal, waterline, sewer line, drainage system, and airport projects. He has extensive experience administering federal-aid projects and is intimately familiar with the various program requirements from both project management and construction management standpoints. He helped the County of Glenn successfully apply for over $36 million in federal HBP funds for 12 different off-system, structurally deficient, or functionally-obsolete bridges since 2010 – also applying Toll Credits as a match to the HBP funds with no local matching funds required from the County. Mr. Gordon successfully lobbied Caltrans for additional approach funding beyond the typical limits. He has written project study reports to qualify projects for STIP funding, time extension requests to Caltrans and the California Transportation Commission, and specifications utilizing various formats such as Caltrans and the American Public Works Association Green Book. Mr. Gordon’s career includes serving as a staff member of the Shasta County Department of Public Works, Caltrans Division of Structures, and City of Redding’s Department of Public Works Relevant Project Experience
Urban Greening Bicycle Trail, City of Lynwood, California. Structural Engineering Task Manager responsible for all structural design and studies required to develop a sustainable, integrated, and efficient design for a bicycle trail within the community consistent with the City's year-round recreational programs. The $2.85 million, 1.2-mile project improvements were designed to meet the City's general plan objectives and incorporate landscaping and decorative/commemorative points-ofinterest along the trail. The ultimate bicycle path provides safe connectivity between parks, bus and light rail transit stops, city hall, and other City attractions and shopping areas.

Willows Memorial Park and Orland Memorial Park Clean California Grant Estimates, County of Glenn, California. Project Manager responsible for collaborating with Department of General Services staff to develop park improvement exhibits and cost estimates. The quick-turnaround project required a specific Caltrans format to qualify the park projects for Clean California Grant funding. The project was completed in less than a week with Willdan and County staff working collaboratively via phone calls and video meetings to ensure exhibits reflected the County's vision and were within the budgetary limits of the grant. The County was awarded $4.4 million in March 2022.

Lakewood Boulevard and Del Amo Boulevard Hot Spot Intersection Improvements, City of Lakewood, California. Structural Engineering Task Manager responsible for all structural design and studies required for the intersection improvements. Improvements encompassed widening the west side of Lakewood Boulevard north of Del Amo Boulevard, modifying/removing the median island on Lakewood Boulevard, widening the south side of Del Amo Boulevard, modifying the median island on Del Amo Boulevard, modifying the traffic signal, relocating street lights per street/median is-land modifications, box culvert/channel wall modifications, extending Del Amo Boulevard Class 2 bike lanes east of Lakewood Boulevard, and converting a bike path to a recreational path. Willdan provided assistance by

Page 195 of 616 ends

Design Phase Engineering Services for the
Preparation of PS&E for the Cudahy Park Renovation
City of Cudahy
34 obtaining a County of Los Angeles construction permit and license agreement for work within the channel.

Hamilton City Community Hall and Chester Walker Memorial Library ADA Improvements Upgrades, County of Glenn, California. Project Manager/Specification Writer responsible for coordinating the architectural design and delivering the plans, specifications, and cost estimate to remodel the Community Hall and the Library in Hamilton City to meet ADA standards. Services extended into construction to provide submittal reviews and RFI responses.

Departmental Office Floor Space Re-Allocation, County of Glenn, California. Project Manager responsible for collaborating with Department of General Services staff to update floor area allocations among various County departments to establish appropriate General Service maintenance and custodial cost allocations for each department's occupied space. Willdan maintains and updates the CAD files reflecting office layouts by County building and floor level. As usage changes, CAD files along with each department's allocated square footage are updated in a master spreadsheet. Adobe Acrobat files of each floor with allocated area for each department are prepared for the County's use.

Various Bridge Replacements and Roadway Improvements, County of Glenn, California. Project Manager responsible for overall project management and services provided for projects throughout the County, including 11 HBP-funded bridge replacement projects. Common elements of all projects include project management, surveying, right-of-way engineering, utility coordination, geotechnical investigation, hydrologic/hydraulic analysis, preliminary engineering studies, environmental documentation, roadway approach design, bridge design, right-of-way clearance and certification, PS&E preparation, bid assistance, and construction support.

Five Bridge Replacements and Bridge Preventive Maintenance, County of Mariposa, California. Project Manager responsible for overall project management and oversight of design services for five bridge replacements and two Bridge Preventive Maintenance Program projects consisting of over 20 bridges.

Services encompass project management, surveying/right-of-way engineering, hydrology/hydraulics, geotechnical, environmental permitting, bridge and road design, appraisal and acquisition, utility coordination, and Caltrans Local Programs assistance.

Mattole River Bridge on Briceland Road, County of Mendocino, California. Project Engineer responsible for the design of this bridge replacement project located on a rural county road that provides access to Sinkyone Wilderness State Park within Mendocino County’s costal wilderness area. Briceland Road over Mattole Creek Bridge’s approach roadway alignment is a series of curves and rolling hills. The existing bridge was constructed in 1967 and is a single-lane structure that consists of two railroad flat cars placed side by side. It has been rated functionally obsolete. In addition, the existing bridge is scour critical; field review indicates that extensive scour has occurred at the bridge foundations. Willdan's replacement option is a single-span precast prestressed box girders that eliminates the need for falsework in this environmentally sensitive area.

County Engineering Services, County of Glenn, California. Project Manager responsible for over-all project management and services provided for various bridge replacement projects throughout the county, including 10 HBP-funded bridge replacement projects. Common elements of all projects include project management, surveying, right-of-way engineering, utility coordination, geotechnical investigation, hydrologic/hydraulic analysis, preliminary engineering studies, environmental documentation, roadway approach and bridge design, right-of-way clearance and certification, PS&E preparation, bid assistance, and construction support.

Page 196 of 616 ends

Design Phase Engineering Services for the
Preparation of PS&E for the Cudahy Park Renovation
City of Cudahy
35 Ross Khiabani, PE, GE
Geotechnical Engineer
Profile Summary
Education:  MS, Geotechnical Engineering, California State University, Long Beach  Geology, Pahlavi University, Iran
Registration:  Civil Engineer, California No. 37156
 Geotechnical Engineer, California No. 2202
Experience: 47 Years
Mr. Ross Khiabani has more than 47 years of professional experience in performing diversified geotechnical assignments involving soil mechanics and foundation engineering, soil stabilization, landslide analysis and stabilization, settlement evaluations, liquefaction studies, slope stability analyses, laboratory testing, and inspection services during construction operations. His vast experience includes providing engineering services for commercial, industrial, institutional, ports and harbors, public works, transportation (including major bridges, local roads, freeways and toll roads) and water and wastewater facilities projects. This broad base of experience has given him a unique insight into local geotechnical and seismic conditions, and construction processes. Mr. Khiabani has kept in close communication with local, city, county, and state reviewers and is familiar with governing codes and requirements.

Relevant Project Experience
On-Call Geotechnical Services, City of Calabasas, California. Geotechnical Engineer. Willdan provides review of geotechnical and engineering geology reports and plans submitted by developer’s soils engineers and/or engineering geologist using City established policies and procedures and within City timeframes. Prepare review comments and conditions of approval. Review responses to review comments provided by the developer’s geotechnical consultant and work with the developer’s soils engineer to resolve issues generated by review comments. Attend meetings with developers, builders, engineers, and consultants in a timely manner to resolve issues generated during the report review process or during construction. Review soils reports submitted by the developer’s geotechnical consultant for proposed changes during grading. Provide technical support to the City for geotechnical engineering and geologic-related issues on an as-needed basis.

On-Call Geotechnical Services, City of Diamond Bar, California. Geotechnical Engineer. Willdan provides review of geotechnical and engineering geology reports and plans submitted by the developer’s soils engineers and/or engineering geologist using City established policies and procedures and within City timeframes. Prepare review comments and conditions of approval. Review responses to review comments provided by the developer’s geotechnical consultant and work with the developer’s soils engineer to resolve issues generated by review comments. Attend meetings with developers, builders, engineers, and consultants in a timely manner to resolve issues generated during the report review process or during construction. Review the soils reports submitted by the developer’s geotechnical consultant for proposed changes during grading. Provide technical support to the City for geotechnical engineering and geologic-related issues on an as-needed basis.

Fitness Park, City of Paramount, California. Geotechnical Engineering Task Leader responsible for geotechnical engineering and testing services required for improvements to the park. The project includes synthetic turf play fields, 400-meter walking/running track, multi-use soft-footed trails, exercise stations, parking, security lighting, and enclosed decorative steel fencing for the entire park. The park is

Page 197 of 616 ends

Design Phase Engineering Services for the
Preparation of PS&E for the Cudahy Park Renovation
City of Cudahy
36 located within Southern California Edison's right-of-way – requiring a lengthy review and adherence to all SCE conditions of approval requirements.

Golden West College Student Services Site Underground HVAC Piping-Huntington Beach, California.

Coast Community College District. Project Manager. Geotechnical material testing and inspection services, Golden West College Student Services site underground HVAC piping.

Kanan Road and Highway 101 Interchange, City of Agoura Hills, California. Project Manager closely working with Caltrans oversight staff performed a geotechnical investigation for the City of Agoura Hills.

This project included the development of drilling work plans, permit acquisition, traffic control, soil and rock logging, sampling, laboratory tests, and foundation recommendations for highway improvements consisting of removal of existing off-ramps, relocation, and widening of streets, construction of bridges and relocation and construction of new on- and off-ramps.

Fedde Middle School Sports Field Master Plan/The Irving Moskowitz Stadium, City of Hawaiian Gardens, California. Geotechnical Engineering Task Leader responsible for geotechnical engineering and testing services required for the sports park master plan for the school site. The master plan consisted of soccer/football fields, baseball diamonds, 400-meter running track and handball courts. Site amenities included concession/restroom buildings, grandstands, stage and playground area. In addition, the City has requested a conceptual design/study for a parking lot over the adjacent Los Angeles County flood control channel.

La Mirada Aquatics Center, La Mirada Unified School District, La Mirada, California. Geotechnical Engineer. Responsible for site investigation and services during construction. Willdan performed the civil design in conjunction with the architectural design team for this unique City-owned project.

Additionally, Willdan served as the construction manager, on-site building official, and construction inspector for this project that has four distinct components: a 20,000-square-foot aquatics building - accommodating locker rooms, bathrooms, offices, multi-purpose areas; construction of three pools - a 50-meter competitive pool, a 25-meter practice pool and a smaller indoor pool and lazy river pool; expansion and interior tenant improvements of the public safety building - a one-story masonry addition with lighting; and parking and site improvements to the surrounding park areas - approximately 180 additional stalls.

Orange Coast Community College, Newport Learning Center, Newport Beach, California. Providing geotechnical engineering, materials testing and inspection services for the construction of the Newport Learning Center, a 3-story type II-B building with 112,795 ASF, associated site development including a large bio-filtering facility, and parking/driveway areas. Services consist of geotechnical observation and testing during remedial grading, over-excavation, mass grading, foundation excavations and utility trench backfill. Testing and Inspection services also include Special Inspection for poured-in-place caissons and 138 soil anchors/tiebacks necessitated by the load demand imposed by a special design element – outward leaning external walls.

Walmart Construction Management & Inspection Services, City of Ridgecrest, California. Materials Testing Manager. Was responsible for quality assurance materials testing during construction of offsite and onsite improvements. Willdan performed complete Construction Management, Geotechnical and Inspection services. In addition, we performed technical inspection services for onsite and offsite grading, street construction, drainage channel construction, drainage culvert construction, asphalt placement, concrete construction and earthwork activities. Provided geotechnical consultation, testing and verification services to meet City of Ridgecrest design standards and per Walmart-approved plans.

Page 198 of 616 ends

Design Phase Engineering Services for the
Preparation of PS&E for the Cudahy Park Renovation
City of Cudahy
37 David Woolley
Survey
Profile Summary
Education:  Survey & Mapping Coursework at Santiago Canyon College  Courses: Ethics, Business & Professions Code, ALTA/NSPS Courses, Copyright Law and Land Surveying
Registration:  Professional Land Surveyor, California PLS 7304 Experience: 31 Years
Mr. David Woolley is an expert in land surveying; standard of care; construction surveying; boundary line determination and analysis; boundary disputes; deed interpretation; boundary reconstruction; easement analysis and construction; map preparation; and construction and constructability. He has expertise in the Professional Land Surveyor’s Act and the Subdivision Map Act; ALTA surveys; documentation of construction defects; settlement/displacement surveys. land surveying; standard of care; construction surveying; boundary line determination and analysis; boundary disputes; deed interpretation; boundary reconstruction; easement analysis and construction; map preparation; construction and constructability, Mr. Woolley is a recognized land title expert with a proven ability to resolve complex boundary and title review issues and to provide surveys for cases involved in complex litigation throughout the state.

Relevant Project Experience
Survey and Mapping Services, City of Inglewood, California. Survey/Mapping Review. Willdan provided map checking and legal description checking for the City of Inglewood’s engineering department.

Through the on-call services contract, Willdan provided technical reviews of parcel maps, tract maps, lot line adjustment, certificates of compliance, and lot mergers. Willdan was heavily involved in checking various items for the Stadium project.

Survey Services, City of Lakewood, California. Survey/Mapping Review. Willdan performed a topographic survey and partial boundary survey at Lakewood Equestrian Park.

Long Beach Blvd ADA Curb Ramps, City of Lynwood, California. Survey Lead. Willdan provided the design of 21 ADA curb ramps within the Long Beach/Freeway 105 interchange. The scope also included the installation of five ramps for the park and ride and one ramp on the westbound onramp. Willdan surveyed 21 curb ramps for the City of Lynwood within Caltrans ROW at Long Beach Blvd and Freeway 105 interchange so that the redesign would be in compliance with ADA. The scope also included acquiring the Caltrans encroachment permit and engineering support during construction.

Plan Check Services, City of Rialto, California. Survey/Mapping Review. Willdan is providing the City of Rialto with on-call plan-checking services. Plan checking services are provided on engineering plans and studies that are submitted for review by the development community. Plan check services may include but are not limited to grading plans, street improvement plans, sewer and water plans, storm drain plans, traffic plans, landscape plans and all associated studies and reports. Willdan is working with the City to develop an electronic plan check process to allow for all electronic submittals.

Orange County Surveyor’s Office, Reviewed Over 1000 Tract Maps, 500 Parcel Maps and 300 Record of Surveys, California. Former supervisor of the Lot Line Adjustment, Certificate of Compliance, Records of Survey, Parcel Map and Tract Map compliance checking section of the Orange County Surveyor's office.

Was responsible for compliance with state laws, local ordinances and boundary determination. In

Page 199 of 616 ends

Design Phase Engineering Services for the
Preparation of PS&E for the Cudahy Park Renovation
City of Cudahy
38 addition to the preparation of Records of Survey, reviewed over 1000 Tract Maps, 500 Parcel Maps and 300 Records of Survey prepared by Professional Land Surveyors.

Long Beach City Surveyor, California. Interim City Surveyor for the City of Long Beach. Was responsible for the land surveying functions of preparing right-of-way documents (i.e. vacations, dedications, acquisitions, etc. or checking the same when prepared by consultants, private property developers, or other agencies). Additionally, as the Contract City Surveyor, reviewed all right-of-way and land surveying work for compliance with state laws (i.e. Government Code (Subdivision Map Act), Civil Code, Civil Procedures, Streets and Highways Code, Public Resource Code, Professional Land Surveyors Act and the agency's local ordinances). This required familiarity with the laws but the ability to work with the private engineers, surveyors, owners, developers, other agencies and protect the interest of the Department.

Page 200 of 616 ends

Design Phase Engineering Services for the
Preparation of PS&E for the Cudahy Park Renovation
City of Cudahy
39 Diane Rukavina, PE
Grant Funding
Profile Summary
Education:  BS, Civil Engineering, Loyola Marymount University Registration:  Civil Engineer, California No. 36380
Experience: 36 Years
Ms. Diane Rukavina has 36 years of experience in municipal engineering. Presently, she administers federal/state funding administration projects in the Cities of Hawaiian Gardens, La Cañada Flintridge, Lakewood, La Puente, Maywood, Norwalk, Paramount, Pico Rivera, Rancho Palos Verdes, South Gate, and South Pasadena. Ms. Rukavina has processed over 60 federal and state-funded projects (STPL, TEA21, SAFETEA-LU, ARRA, HSIP, TCSP, ER, CMAQ, SRTS, and SR2S) from requests for authorization to final invoicing for 22 cities. Currently, she is coordinating 28 federal and state-funded projects at various stages in the funding process. Ms. Rukavina also serves as Project Manager for six capital improvement projects for the City of Paramount, performs various city engineering-related tasks, and has organized GASB 34 infrastructure inventories for the Cities of Seal Beach, Rosemead, Monrovia, and Bell Gardens in preparation for value assessment.

Ms. Rukavina has over 15 years of experience preparing and submitting documentation to Metropolitan Transportation Agency and Caltrans for federal- and state-funded projects, including STPL, TEA-21, SAFETEA-LU, ARRA, HSIP, TCSP, ER, CMAQ, SRTS, and SR2S. Although each program encompasses different components and requirements, the general process remains the same – following the Caltrans Local Assistance Procedures Manual. Ms. Rukavina keeps abreast of revisions (LPPs) to procedures and forms in the manual.

Relevant Project Experience
Sunset Avenue/Francisquito Avenue Traffic Signal Modification HSIP Cycle 6, City of West Covina, California. Funding Administration Task Leader responsible for all administrative filings and reporting to satisfy funding requirements for a traffic signal modification at the intersection. The City was awarded a $165,200 HSIP Cycle 6 grant to upgrade the traffic signal by installing protected left-turn phasing on West Francisquito Avenue at Sunset Avenue, modifying lighting, and installing a pedestrian countdown head.

Traffic Signal Improvements at Seven Intersections HSIPL Cycle 2, City of Lakewood, California. Grant Administration Task Leader responsible for all administrative filings and reporting to satisfy funding requirements for an E-76 for construction through the final reimbursement of federal funds.

Documentation included field review, preliminary environmental study, right-of-way certification, request for authorization to proceed with construction, construction contract award submittal, progress invoicing, and final report of expenditures for submittal to Caltrans.

Garfield Avenue Corridor Improvements, City of Paramount, California. Grant Administration Task Leader responsible for all administrative filings and reporting to satisfy funding requirements for street improvements between the north City and the south city limits. The design involved street widening to accommodate a third lane in each direction; street resurfacing; two concrete intersections; concrete sidewalk, curb and gutter, and driveway approach reconstruction; catch basin construction; streetscape improvements for raised landscaped medians and modifications to existing medians; two entry monument signs; and traffic signal modifications at nine locations along the Garfield Avenue corridor.

Page 201 of 616 ends

Design Phase Engineering Services for the
Preparation of PS&E for the Cudahy Park Renovation
City of Cudahy
40 Services included civil, traffic, and drainage engineering; survey and mapping; utility relocation; landscape architecture; and pavement management.

Firestone Boulevard and California Avenue Traffic Signal Modifications HSIP Cycle 4, City of South Gate, California. Grant Administration Task Leader responsible for all administrative filings and reporting to satisfy funding requirements for federally funded Cycle 4 HSIP installation of protected leftturn phasing on Firestone Boulevard at State Street and on California Avenue at Tweedy Boulevard. The City received $531,000 in federal funds and anticipates the total project cost being $590,000. The intersection of Firestone Boulevard at State Street will require vehicle detection upgrades and countdown pedestrian head installation beside the protected/permissive left turn phasing. The intersection of California Avenue and Tweedy Boulevard will require research for the modification of existing decorative poles to accommodate the fully protected left turn phasing. Other services provided by Willdan included grant administration and utility coordination.

Crenshaw Boulevard and Crestridge Road Traffic Signal Improvements HSIPL Cycle 1, City of Rancho Palos Verdes, California. Funding Administration Task Leader responsible for all administrative filings and reporting to satisfy funding requirements for an E-76 for preliminary engineering and construction through final reimbursement of federal funds. Documentation included the request for authorization to proceed with preliminary engineering, field review, preliminary environmental study, right-of-way certification, request for authorization to proceed with construction, construction contract award submittal, progress invoicing, and final report of expenditures for submittal to Caltrans.

Garfield Avenue and Petterson Lane Traffic Signal Improvements HSIPL Cycle 2, City of Paramount, California. Funding Administration Task Leader responsible for all administrative filings and reporting to satisfy funding requirements for an E-76 for construction through the final reimbursement of federal funds. Documentation included the field review, preliminary environmental study, right-of-way certification, request for authorization to proceed with construction, construction contract award submittal, progress invoicing, and final report of expenditures for submittal to Caltrans.

Roadside Avenue Bridge Widening, City of Agoura Hills, California. Funding Administration Task Leader responsible for all administrative filings and reporting to satisfy funding requirements for widening the bridge. The project involved widening the bridge and approaches to accommodate a sidewalk and increasing the traveled way to meet current geometric standards. Willdan's services entailed preliminary engineering; environmental compliance and permits; final design, including construction drawings, special provisions, and cost estimating; environmental mitigation program; right-of-way; local, state, and federal agency permit coordination; grant funding administration and compliance; Local Assistance reports and document preparation; stormwater pollution prevention plan preparation; and bidding and construction support services.

La Brea Avenue Intersection Realignment and Reconstruction, City of Inglewood, California. Funding Administration Task Leader responsible for all administrative filings and reporting to satisfy funding requirements for the two-phased $8.5 million, federally-funded improvements to reconfigure street intersections; construct street improvements; install traffic signals at Brea Avenue, Market Street, Spruce Avenue, and La Palma Avenue; and reconstruct pavement on La Brea Avenue between 104th Street and Hawthorne Boulevard. The street improvements project scope entailed PCC bus pads, minor concrete with utility frame cover adjustments, a new traffic signal and modification of two existing traffic signals, sidewalks, driveways, median curbs, automatic irrigation system, tree planting, striping, and signage.

Page 202 of 616 ends

Design Phase Engineering Services for the
Preparation of PS&E for the Cudahy Park Renovation
City of Cudahy
41 Jeffrey Lau, PE, TE, ENV SP
Traffic Engineering Lead
Profile Summary
Education:  BS, Civil Engineering Polytechnic State University, Pomona Registration:  Civil Engineer, California No. 83887
 Traffic Engineer, California No. 2835
 Doppler Radar Operator
Experience: 19 Years
Mr. Jeffrey Lau possesses expertise in various facets of traffic engineering, including field investigations, traffic data collection and analysis, traffic design, and project management. Mr. Lau has been involved in fieldwork, design, and drafting on a variety of traffic engineering projects, including traffic signals, signing and striping, street lighting, and construction traffic control. He has assisted with the preparation of traffic impact studies and analyses, plan reviews, engineering and traffic survey studies, and recertifications/updates. Mr. Lau is highly proficient in numerous traffic software programs such as AutoCAD, MicroStation, Synchro, HCS+, PC-Warrants, AGi32, and Crossroads Collision Database.

Relevant Project Experience
Paramount Boulevard Urban Renovation and Complete Street Improvements, City of Paramount, California. Traffic Engineering Designer responsible for providing traffic engineering design for improvements required for street improvements necessary to transform Paramount Boulevard from a four-lane arterial roadway into a scenic, multi-modal complete street corridor lined with shade trees and LED lighting to foster a more walkable and vibrant downtown atmosphere. The improvements involved traffic-calmed vehicle lanes with bulb-outs, two mid-block pedestrian crossings enhanced with rectangular rapid flashing beacons, a new traffic signal, LED street and pedestrian lighting, parklet, bus shelters, new sidewalks, monument signs, and drought-tolerant streetscaping.

Coyote Creek Bicycle Trail and Park, City of Los Alamitos, California. Traffic Engineering Task Leader responsible for oversight of traffic engineering services provided for the bicycle trail and park improvements. The improvements encompassed new sculptural/artistic gates, landscaping, and wayfinding and interpretive graphics/features at trailheads at Katella Avenue and Willow Street, Oak Academy Park and Oak Street, Cerritos Avenue, and Los Alamitos Boulevard and Nor-walk Boulevard.

The project involved removing and reconstructing deteriorated pavement sections and adjusting water valve covers to grade. Permits for environmental clearance and construction were obtained through a collaborative effort with the U.S. Army Corps of Engineers along with a negotiated cooperative maintenance agreement with the Los Angeles County Department of Public Works.

West Santa Ana Branch Bicycle Trail STP Application, City of Paramount, California. Traffic Engineering Task Leader responsible for oversight of traffic engineering services required to prepare an ATP Cycle 3 application for the City's bicycle trail improvement project. The necessary application documents were completed and narrative questions were researched and answered. Services encompassed attending meetings; gathering collision data; researching grant application projects by reviewing City master plans, general plans, and regional plans; performing field investigations; preparing cross sections and alignment concepts; assessing conflicts; identifying right-of-way takes; assessing environmental impacts; and preparing an engineering estimate.

Page 203 of 616 ends

Design Phase Engineering Services for the
Preparation of PS&E for the Cudahy Park Renovation
City of Cudahy
42 Garfield Avenue Class II Bicycle Lanes ATP Application, City of South Gate, California. Project Manager responsible for overall project management and oversight for preparing ATP Cycle 3 applications for the City's bicycle trail improvement project. The necessary application documents were completed and narrative questions were researched and answered. Services encompassed attending meetings; gathering collision data; researching grant application projects by reviewing City master plans, general plans, and regional plans; performing field investigations; preparing cross sections and alignment concepts; assessing conflicts; identifying right-of-way takes; assessing environmental impacts; and preparing an engineering estimate.

Long Valley Road/Valley Circle Boulevard/U.S. 101 On-Ramp Improvements. City of Hidden Hills, California. Traffic Engineering Task Leader responsible for traffic engineering design and studies required to improve traffic congestion and pedestrian access at the Long Valley Road on-ramp intersection. The improvements encompass sidewalks, right turn-out lane, a paved public parking lot and staging area for City entry, an on-ramp sidewalk, shoulder paving, and other improvements at the heavily congested intersection of Long Valley Road and U.S. 101 on-ramp. Willdan is providing civil, drainage, landscape architectural, and traffic design; environmental compliance documentation; survey; geotechnical engineering and materials testing; grant funding administration; utility coordination; NPDES, SWPPP, and erosion control; right-of-way engineering; and construction support for this Measure R improvement project.

Firestone Boulevard Capacity Enhancement, City of South Gate, California. California. Traffic Engineering Task Leader responsible for traffic engineering design and studies required for the corridor improvements from Alameda Street to Hunt Avenue. The improvements involved roadway widening from four to six lanes; pavement rehabilitation; landscape and hardscape medians; median lighting; sidewalk, curb and gutter, and driveway approach reconstruction; ADA-compliant ramps; parkway trees; artistic elements and corridor entrance monument; bus shelter and bus turnouts; and traffic signal modifications. Services provided included civil, traffic, pavement, and drainage engineering; landscape architecture, survey and right-of-way engineering; and utility relocation.

Lakewood Boulevard Regional Corridor Capacity Enhancement, City of Lakewood, California. Traffic Engineering Task Leader responsible for oversight of traffic engineering services provided for 1½-mile complete street/green street improvements between the north City limit and Del Amo Boulevard to provide for a regional bicycle path in compliance with the Gate-way Council of Governments Active Transportation Plan and improve pedestrian access to retail/commercial establishments. The design entailed coordination of pedestrian and bicycle movements into the current County Traffic Signal Synchronization Program, undergrounding utility distribution and transmission, Green Streets stormwater quality treatment, and drought-tolerant landscaping. Other improvements involved upgraded traffic signal equipment to improve safety, bicycle parking and lockers, improved transit stops, sidewalk additions within the corridor to meet ADA requirements, street resurfacing, and irrigation.

Willdan provided preliminary and final design, NEPA/CEQA documentation and permitting, transit partnering outreach, Corridor Committee meeting participation, and construction funding application preparation.

Palos Verdes Drive North Bicycle Lane RPSTPLE/SR2S Improvements, City of Rolling Hills Estates, California. Traffic Engineering Designer responsible for providing traffic engineering design provided for a $4 million improvement project adding bicycle lanes between Crenshaw Boulevard and the west city limits. Willdan provided preliminary and final design and construction management for the 1.26-mile roadway widening. The improvements were necessary to accommodate a second through lane at major intersections to increase capacity and add 5-foot bicycle lanes within a 200-foot right-of-way.

Page 204 of 616 ends

Design Phase Engineering Services for the
Preparation of PS&E for the Cudahy Park Renovation
City of Cudahy
43 Kevin Custado, EIT, ENV SP
Electrical (Site Lighting)
Profile Summary
Education:  BS, Civil Engineering, California Polytechnic State University, Pomona Registration:  Engineer-in-Training, California No. 153964; Envision Sustainability Professional Experience: 8 Years
Mr. Kevin N. Custado specializes in traffic engineering investigations and planning and is knowledgeable in highway engineering processes and their application to operating systems. He is experienced in park lighting, traffic signalization and the geometric design of transportation projects, including alignment reconfiguration, quantity estimates, plan and profile generation using AASHTO and Caltrans design manuals, and coordinating with other disciplines. Mr. Custado clearly conveys design intent in engineering drawings and specifications and has developed a thorough understanding of construction methods and issues that arise as engineering drawings and specifications are translated into the constructed product.

Relevant Project Experience
Norwalk 12 Park Lighting Analysis, City of Norwalk, California. Design Engineer. Willdan provided energy and engineering services for the lighting analysis and audit of 12 parks in the City of Norwalk.

The City is interested in retrofitting the existing parks’ lighting fixtures in order to reduce the energy consumption throughout the parks, as well as supplementing the existing lighting with additional lighting to improve safety in and around the parks and reduce crime. Furthermore, three parks have ballfields that are not currently lit and the City is requesting a lighting analysis be performed to assess how much it would cost to install energy-efficient ballfield lighting.

Traffic Signal Design, City of La Mirada, California. Design Engineer. Willdan is responsible for the preparation of plans, specifications and estimates (PS&E) for the design of three (3) traffic signal modifications at the intersections of La Mirada Boulevard and Rosecrans Avenue, Imperial Highway and Santa Gertrudes Avenue, and Imperial Highway and Ocaso Avenue. The objective is to upgrade the existing traffic signals to meet current design standards, including but not limited to the replacement of pedestrian heads, 8-inch vehicle heads, pedestrian push buttons, as well as add additional vehicle heads for thru lanes, upgrade safety lighting to LED, and replace IISNS with RSNS on a cantilever arm Firestone/Atlantic Design, City of South Gate, California. Design Engineer. Willdan provided surveying, civil engineering, geotechnical engineering, and utility coordination services for street improvements on Firestone Boulevard from Dorothy Avenue to Lotta Avenue and on Atlantic Avenue from Patata Street to Branyon Avenue. As part of our design services, Willdan provided final civil plans, including street design, storm drain, sewer and water relocation, traffic signal modification and installation, signing and striping, street lighting, contract specifications, and engineer's estimate for widening both Firestone Boulevard and Atlantic Avenue. In addition, Willdan prepared a project report and cost estimates, including aerial topography and street centerlines; roadway geometrics; hydrology study; sewer study; water study; utility relocation concepts; geotechnical recommendations; turn pocket lengths; landscaping.

Page 205 of 616 ends

Design Phase Engineering Services for the
Preparation of PS&E for the Cudahy Park Renovation
City of Cudahy
44 Traffic Signal at Palos Verdes Drive North and Rolling Hills Road, City of Rolling Hills Estates, California.

Design Engineer. Willdan provided engineering services for design and utility coordination for the traffic signal modification project at the intersection of Palos Verdes Drive North and Rolling Hills Road in the City of Rolling Hills Estates. Presently, the traffic signal poles have a decorative wood cover. In order to retain a similar look, the traffic signal modification will include new decorative poles designed by South Coast Lighting, including the modified foundations. The primary purpose of the traffic signal modification is to provide protected/permissive left-turn phasing for both directions on Palos Verdes Drive North and the replacement of all the traffic signal poles with new decorative poles and the City has a budget of $240,000. Preparation of plans, specifications and estimate will be completed within a one-month period to expedite the process and get the project to construction within a six-month period. Willdan will assist the City with the procurement of long-lead time equipment such as the traffic signal controller cabinet and traffic signal poles to minimize delays on the project.

Foothill Blvd-Dalton Avenue Traffic Signal Installation Design, City of Azusa, California. Design Engineer. Willdan Engineering provided professional traffic engineering design services for the City of Azusa. The project required professional engineering design services for the preparation of plans, specifications and estimates (PS&E) for the traffic signal installation at the intersection of Foothill Boulevard at Dalton Avenue. Minor signing and striping modifications were required and were shown on the traffic signal plan. Due to the close proximity of the proposed traffic signal to the adjacent traffic signal at Foothill Boulevard and Alameda Avenue, a signal interconnect plan was also prepared. A field investigation, utility coordination and turning movement counts were also conducted during this design service.

Imperial Highway Project (P610) Traffic Improvement Plans, City of Inglewood, California. Traffic Designer responsible for assisting with the design to prepare traffic signal modification plans for Simms Avenue, Ardath Avenue, Yukon Avenue, and Doty Avenue and signing and striping plans for the project limits. Services encompassed utility coordination, engineering during construction, and coordination with the County of Los Angeles to incorporate their resurfacing plans and bid items into Willdan's plans, specifications, and estimate package. Coordination with the County was required for future implementation of the Imperial TSSP project at its intersections with Prairie Avenue, Crenshaw Boulevard, and Van Ness Avenue.

Foothill Blvd-Dalton Ave Traffic Signal Installation Design, City of Azusa, California. Design Engineer.

Willdan Engineering provided professional traffic engineering design services for the City of Azusa. The project required professional engineering design services for the preparation of plans, specifications and estimates (PS&E) for the traffic signal installation at the intersection of Foothill Boulevard at Dalton Avenue. Minor signing and striping modifications were required and were shown on the traffic signal plan. Due to the proximity of the proposed traffic signal to the adjacent traffic signal at Foothill Boulevard and Alameda Avenue, a signal interconnect plan was also prepared. A field investigation, utility coordination and turning movement counts were also conducted during this design service.

Page 206 of 616 ends

Design Phase Engineering Services for the
Preparation of PS&E for the Cudahy Park Renovation
City of Cudahy
45 4. Similar Projects and References
Willdan designs and develops quality parks and recreation facilities with a strong sense of place through a thoughtful planning, design, and implementation process that saves costs and optimizes long-term maintenance. We have completed dozens of parks and recreation facilities that combine functional, visually pleasing environments and build strong community connections. Below is a list of our similar park projects.

Project/Client Improvements Scope of Services Building Grading Park Landscaping Design Resident Engineering Construction Management Construction Inspection Scheduling Survey Constructability Review Utility Coordination Materials TestingCommunity OutreachEnvironmental DocumentationLabor Compliance Salud Fitness Park, City of
Paramount              
La Puente Park Beautification
Project, City of Paramount             
Recreation Center Master
Plan Expansion, City of
Fountain Valley
             
Riverfront Park, City of
Maywood                
Police Department Remodel,
City of Palm Springs            
Rails-to-Trails Walking,
Running, and Bicycle Route
Improvements, City of Rialto
          
Bud Bender Park
Rehabilitation, City of Rialto              Anderson Park, Rialto City
Park, and Frisbie Park
Concession and Restroom
Facilities, City of Rialto
          
Chittick Field Renovation, City
of Long Beach              
Discovery Sports Complex,
City of Downey        
Whittier Dog Park, City of
Whittier   
Paramount Park Expansion,
City of Paramount    x x        
Cesar Chavez Park, City of
South Gate           

Page 207 of 616 ends

Design Phase Engineering Services for the
Preparation of PS&E for the Cudahy Park Renovation
City of Cudahy
46 Project/Client Improvements Scope of Services Building Grading Park Landscaping Design Resident Engineering Construction Management Construction Inspection Scheduling Survey Constructability Review Utility Coordination Materials TestingCommunity OutreachEnvironmental DocumentationLabor Compliance Heritage Valley Parks Tract
No. 5520 Offsite and Onsite
Improvements, City of
Fillmore
           
Caruthers Park Storm Water
and Urban Runoff Capture,
City of Bellflower
            
Lindero Linear Park Phases 1
and 2, City of Westlake Village    
Heritage Park Aquatics
Complex, City of Irvine             
Community Park and YMCA
Building, City of Westlake
Village
            

Page 208 of 616 ends

Design Phase Engineering Services for the
Preparation of PS&E for the Cudahy Park Renovation
City of Cudahy
47 Willdan is pleased to provide the following reference projects performed during the past five years.

These projects were completed within the agency’s timeframe and the construction costs were within the allocated budgets. Reference contact information is provided with each project description.

Salud Park, Paramount, California
Client Project Manager:

David Johnson, Director of
Community Services and Recreation,
City of Paramount, 14522 Garfield
Ave, Paramount, CA 90723
Phone: (562) 220-2138
Services :

Project Management, Design,
Landscape Architecture, Construction
Management
Start-End Dates:
2009 – 2015
Proposed Staff Involvement: John Hidalgo, RLA, Project Manager Total Project Cost:
$4,600,000
Funding for this 8-acre park development was available through a park grant from Proposition 84. Willdan was involved with this project from the very beginning of planning, through the grant application submittal and the preparation of construction documents. Willdan also handled the construction management services. The project includes synthetic turf play fields, a 400-meter walking/running track, multi-use soft-footed trails, exercise stations, parking, security lighting, and enclosed decorative steel fencing for the entire park. The park development is located within Southern California Edison right-of-way, therefore went through a lengthy review process and adhered to all requirements set forth in the SCE conditions of approval.

Page 209 of 616 ends

Design Phase Engineering Services for the
Preparation of PS&E for the Cudahy Park Renovation
City of Cudahy
48 La Puente Park Beautification Project, La Puente, California Client Project Manager:

City of La Puente
Contact: John Di Mario, Development
Services Director, 15900 E. Main
Street, La Puente, CA 91744
Phone: (626) 855-1517
[email protected]
Services: Project Management,
Design, Landscape Architecture,
Construction Management
Start-End Dates:
2019 - 2021
Proposed Staff Involvement: John Hidalgo, RLA, Project Manager Total Project Cost:
$2,300,000
Willdan provided landscape architecture design services involving the enhancement of an existing community park. The park is estimated at 20 acres and encompasses a variety of activities such as baseball, softball and football fields, playgrounds, open lawn areas, a community center, picnic shelters, restrooms, and City maintenance yard. The new additions include an expanded decorative concrete promenade area for the softball and little league fields, parking lot reconfiguration, ballfield lighting, shade trees, benches, pedestrian lighting and new landscape and state of the art irrigation system. Willdan is currently providing construction management and inspections.

Page 210 of 616 ends

Design Phase Engineering Services for the
Preparation of PS&E for the Cudahy Park Renovation
City of Cudahy
49 Recreation Center Master Plan Expansion, Fountain Valley, California Client Project Manager:

Hyejin Lee, Director of Public Works,
City of Fountain Valley, 10200 Slater
Ave, Fountain Valley, CA 92708
Phone: (714) 593-4434;
[email protected]
Services :

Project Management, Design,
Landscape Architecture,
Construction Management
Start-End Dates:
2009-2012
Proposed Staff
Involvement:

John Hidalgo, RLA, Project
Manager
Total Project Cost:
$17,100,000
Willdan was responsible for the rehabilitation of an existing 55-acre sports complex and an addition of 23 acres to produce a new 78-acre regional sports facility. The project provides the community with six new softball fields, six Little and Pony League fields, four soccer fields, a utility field, a large concert-in-the park and assembly area, two new concession/restroom buildings, a new maintenance building and over one mile of natural hiking trails that connect to the existing County hiking trail system in Mile Square Park. The new improvements add to the existing tennis courts, indoor and outdoor basketball courts, handball and racquetball courts and recreation building.

Page 211 of 616 ends

Design Phase Engineering Services for the
Preparation of PS&E for the Cudahy Park Renovation
City of Cudahy
50 Riverfront Park, Maywood, California
Client Project Manager:

City of Maywood, 4319 E Slauson
Avenue, Maywood, CA 90270
Phone: (626) 643-6996;
[email protected]
Services: Project Management,
Design, Landscape Architecture,
Construction Management
Start-End Dates:
2008-2015
Proposed Staff
Involvement:

John Hidalgo, RLA, Project
Manager
Total Project Cost:
$3,400,000
Willdan was retained to develop a 7-acre park site that was considered a “brownfield” by the EPA. Portions of the site tested positive for contaminants and were thus declared a Superfund site. This site was occupied previously by a railroad track spur, a metal plating company, a battery manufacturer, and residential properties. A thorough remediation program administered by the Environmental Protection Agency has allowed the reclamation of the land for public use. Willdan assisted in securing various grant funding along with working closely with the EPA in developing and ensuring mandated mitigation measures were met for site reclamation. Over ten governing agencies were involved in developing/overseeing this park site.

The park consists of 7.3 acres adjacent and overlooking the Los Angeles River. Development of the park includes street vacation, extensive network of monitoring wells relocation and adjustments, parking lot, restroom facilities, retaining walls, large gathering spaces, landscaping, sidewalks, bicycle paths, a staging/resting area for those using the Los Angeles river trail, a bridge, walking trails, lawn and picnic areas, a basketball court, a passive playfield, a California native demonstration gardens reflecting the river’s natural plant community habitat, the incorporation of a swale to add to a natural habitat setting and aid in the control of runoff, community art sculptures and plenty of shade trees to sit under. Field and security lighting is provided for evening use of the park. Willdan prepared plans, specifications, and estimates for Riverfront Park with funds made available through Trust for Public Land, Coastal Conservancy, and various park bond measures.

By meeting all the strict mitigations imposed on the site, Willdan successfully completed the construction of the park site which integrated character and personality to the local community along the LA River Corridor.

Page 212 of 616 ends

Design Phase Engineering Services for the
Preparation of PS&E for the Cudahy Park Renovation
City of Cudahy
51 5. City Standard Contract
Willdan has reviewed the City’s Agreement, has no exceptions or comments for the City to consider, and will comply with all aspects of the Agreement. Willdan will also provide the Insurance Coverage Limits and Requirements indicated in the City’s RFP, as provided in Attachment D.

Page 213 of 616 ends

Design Phase Engineering Services for the
Preparation of PS&E for the Cudahy Park Renovation
City of Cudahy
52 6. Required Attachments
Attachment A – Affidavit of Non-Collusion

Page 214 of 616 ends

Design Phase Engineering Services for the
Preparation of PS&E for the Cudahy Park Renovation
City of Cudahy
53

Page 215 of 616 ends

Design Phase Engineering Services for the
Preparation of PS&E for the Cudahy Park Renovation
City of Cudahy
54 Attachment B - Claims History

Page 216 of 616 ends

Design Phase Engineering Services for the
Preparation of PS&E for the Cudahy Park Renovation
City of Cudahy
55

Page 217 of 616 ends

13191 Crossroads Parkway North, Suite 405
Industry, CA 91746-3443
562.908.6200 | 800.499.4484 | 562.695.2120
www.willdan.com

Page 218 of 616 ends

21 EXHIBIT “C”

COMPENSATION RATE

Page 219 of 616 ends

City of Cudahy
Fee Proposal
Provide Design Phase Engineering
Services for the Preparation of PS&E for
the Cudahy Park Renovation Project
November 3, 2022

Page 220 of 616 ends

November 3, 2022
City of Cudahy
5220 Santa Ana Street
Cudahy, CA 90201
Attn: Victor Maria Santiago
Parks and Recreation Manager
Subject: Fee Proposal for Design Phase Engineering Services for the Preparation of PS&E (Plan, Specifications and Estimates) for the Cudahy Park Renovation Project Willdan Engineering (Willdan) is pleased to submit this Fee Proposal to provide Design Phase Engineering Services to the City of Cudahy.

If you have any questions or need additional information, you may contact me at 657-223-8557 and/or by email at [email protected].

Respectfully submitted,

WILLDAN ENGINEERING
Tyrone Peter, PE
Deputy Director of Engineering

Page 221 of 616 ends

Fee Proposal -- Design Phase Engineering Services for the Preparation of PS&E for the Cudahy Park Renovation
City of Cudahy
2 FEE ESTIMATE PROPOSAL
Willdan’s fee estimate is shown below, and our Schedule of Standard Hourly Fee Rates is presented on the following page.

Civil Engineering Plans $35,800
Topographic Survey $13,300
Geotechnical Investigations $28,600
Structural Engineering $ 8,400
Site Amenities Plans $11,300
Landscape and Irrigation Plans $44,500
Shade Shelter Plans $15,700
Playground and Fitness Stations Plans $12,200
Basketball Courts Renovations $14,900
Community Stage Plans $ 8,800
Multi-Purpose Fields Renovations $13,300
Splash Pad Plans $ 8,500
Specifications and Cost Estimates $ 9,500
Bidding Assistance $ 3,200
Construction Support Services $ 6,600
Project Management $17,200
Sub-Consultant
M Y Engineering, Inc. (Electrical and Lighting Design) $20,700 ELMT (Soils Management Plan) $ 6,000
Spohn Ranch (Skate Park Plans) $21,900
AWu Government Services (Community Stage Overhead) $18,500 Total Not to Exceed Fee $318,900

Page 222 of 616 ends

Fee Proposal -- Design Phase Engineering Services for the Preparation of PS&E for the Cudahy Park Renovation
City of Cudahy
2

Page 223 of 616 ends

13191 Crossroads Parkway North, Suite 405
Industry, CA 91746-3443
562.908.6200 | 800.499.4484 | 562.695.2120
www.willdan.com

Page 224 of 616 ends

October 16, 2023
Victor Maria Santiago
Parks and Recreation Manager
City of Cudahy
5220 Santa Ana Street
Subject: Fee Proposal for Additional Design Services for Cudahy Park Renovation Project - Design Phase Engineering Services for the Preparation of Plans, Specifications and Estimate
Amendment No. 2
Dear Mr. Santiago,
This proposal supplements our professional services agreement dated December 6, 2022, for the preparation of PS&E for the Cudahy Park Renovation Project. Please find below our project understanding, scope of work and fee for the above-mentioned subject title.

PROJECT UNDERSTANDING
As per the updated concept plan dated 9/25/2023, the City of Cudahy would like to include additional park features for the Cudahy Park renovation project. Those items include:
1) Nighttime lighting for the playground and fitness stations. 2) Flag poles.
3) Storage building.
4) Courtyard water feature.

The additional services shown on the updated concept plan will be a part of the final construction documents package consisting of plans, specifications and estimate suitable for public bidding.

Please find below the scope of services for the two major items of this amendment, the storage building and courtyard water feature.

SCOPE OF WORK FOR STORAGE BUILDING
Design Criteria

1. New 20' x 30' (600 square foot) storage building.

2. Items to be stored in the building: youth sports equipment (i.e., baseball equipment, flag footballs, soccer equipment, etc.). Two (2) GEM electric vehicles. No hazardous materials or products.

3. A concrete block building with brick veneer finish to match the adjacent library building.

Note: The storage building shall be designed assuming no interference of outside elements, adjacent building footings, easements, underground utilities, etc. If additional coordination or drawings revisions are needed due to these elements, those shall be provided at the hourly rates for the architectural services.

4. Standing seam metal roof.

5. Proposed minimum interior clear height: 12'-0".

6. Open web steel or wood truss joist roof framing structure, factory finish with finish color coat.

7. No ceiling; exposed to the roof structure above.

8. Basic interior shop lighting.

9. Basic exterior lighting to match existing library building lighting.

Attachment B Page 225 of 616
October 16, 2023
Cudahy Park Renovation

Page 2 ends

10. Solar-powered automatic gravity vents with hard-wired operability.

11. Ventilation louvers throughout as needed.

12. One (1) 8'x10' roll-up door and one (1) 3’x7’ steel person door.

13. No window openings.

14. One (1) 200-amp electrical panel, and outlets every 12' (8 to 10 outlets anticipated, including one (1) or two (2) 220 outlets, to be strategically located within the space).

15. Title-24 as required.

Code Compliance - Architect shall put forth reasonable professional effort to comply with applicable laws, codes, and regulations in effect as of the date of the submission of documents to building authorities. Design changes made necessary by new laws, codes, and regulations enacted after this proposal date will be billed at the hourly rates for the required changes.

Site Documentation (Allow 6 hours maximum for this scope)  Walk site to observe the premises based on the proposed project program and points of interest.
 Perform cursory exterior field measurements.
 Verify proposed building placement.
 Observe utilities point of connections (water, electrical panels, sewer lateral, etc.).  Photograph the premises.

Agencies Coordination & City Meetings (Allow 37 hours maximum for this scope)  Schedule a preliminary plan check meeting with the City’s planning and building & safety departments to review the proposed project and code review. Review proposed storage building placement in relation to the existing library building and determine minimum distance allowance between the buildings.
 Coordinate with City and Los Angeles County governing agencies as needed.  City submittals and processing of plan checks and addressing agencies comments.

Design and Programming
 Collection of facts and data.
 Receive and review list of space and equipment needs.  Provide field measurements and approximate square footage of the premises.  Prepare floor plan, roof plan, and exterior elevations.  Assist the City in making preliminary finish selections for review and approval.

Construction Documents
 Prepare documents in detail for the construction and obtain approval from governing agencies to secure building permits.
 Coordinate City comments for inclusion into construction documents.  Submit a 90% and 100% completion set of plans for review.  Respond to and coordinate responses to governing agencies comments- two plan check submittals maximum.
 Deliverables – Print three signed sets of the construction documents- to be issued for permitting.

Construction Support (Allow 17 hours maximum including 4 site visits for this scope)  Attend a pre-construction meeting.
 Respond to the contractor’s requests for information (RFIs) and coordinate with the project consultants.
 Attend field visits to observe the construction. Note, a) Contractor shall manage, coordinate, and distribute all construction field visits/meetings notes and follow-ups; and b) Contractor shall provide weekly construction progress photographs, including overall views and detailed close-up views.

Page 226 of 616 ends

October 16, 2023
Cudahy Park Renovation

Page 3 ends

 Attend one punch list site visit at the end of construction and follow up with a list of items to be addressed for completion of the project.
 Process and review shop drawings and materials samples.  Note: Change orders are to be brought to the Architect’s attention immediately. The contractor shall provide recommendations regarding costs, time, and materials for Architect’s review and approval.

SCOPE OF WORK FOR COURTYARD WATER FEATURE
Design Criteria

1. Water feature will be built according to its environmental criteria and budgetary goals including issues of environmental sustainability, safety, and reasonable maintenance.

2. Below grade equipment vault is included and will be within 50-feet of the water feature.

3. Water cascading with minimal to zero ponding at ground level.

4. Recirculating water.

Concept Design
 Review project’s location for the purpose of evaluating scale, form, space, circulation, and other important design issues and influences.
 Assess the technical implications for water features opportunities and constraints.  Participate in a design teleconference to establish and agree to the design direction.  Prepare six to ten conceptual water feature ideas for review.  Address and present the water feature design material recommendations.  Follow up with one City accepted final concept design for the preparation of construction drawings. The final concept will be rendered in color and sent in a PDF Format. The concept will display the water character and finish materials reference photography.

Construction Documents
 Prepare construction drawings of the water feature’s design character with articulate construction drawings, annotated with dimensions and notes. Includes layout plans, elevations, sections, details, piping and instrumentation diagrams, and specifications.

Materials and finishes are identified, and dimensions noted in scale.  Prepare water feature hydraulic design.
 Prepare equipment vault design, inclusive of filtration system.  Coordinate other trades (plumbing, electrical, civil) regarding technical integration issues.  Prepare and submit 90% and 100% completion construction drawings.  Address City comments from the construction drawings submittals and provide responses to any questions that arise from the submittals.
 Prepare cost estimate for water feature fabrication, equipment and specialty components.

Construction Support
 Review contractor submittals, comment and approve shop drawings for conformance with the design and compliance with the construction drawings.  Monitor construction progress and keep the City apprised. Provide availability to review and resolve outstanding issues with the City and contractor.  Review and respond to request for information (RFI’s) as needed.

Page 227 of 616 ends

October 16, 2023
Cudahy Park Renovation

Page 4 ends

SUMMARY OF FEES
The following list of fees reflects the services noted herein and additional design services that are associated with this Amendment No. 2 for the completion of the construction documents.

Storage Building Design $49,900
Site Documentation ($1,100)
Agencies Coordination ($7,500)
Design and Programming ($2,400)
Construction Documents ($35,500)
Construction Support ($3,400)
Courtyard Water Feature Design $16,600
Survey for Storage Building and Water Feature $5,100
Lighting Design for Playground & Fitness Stations $5,100 Civil Engineering $15,500
Flag Poles $4,200
Total Not to Exceed Fee $96,400

Services not Included

1. Entitlement services and/or conditional use permit applications and city planning department design approval (preparation and presentation of drawings, color boards, plans, color perspective presentation drawings, and revisions thereof, and presentation to the City).

2. Any City planning & zoning requirements and revisions.

3. Processing legal documents i.e., lot ties, variances, etc.

4. Parking requirements studies, investigations and/or shared parking agreements.

5. Any additional work or changes to drawings as required by the building department, health department, or industrial waste department.

6. Budgeting information, cost-saving studies or value engineering.

7. Selection of non-fixed equipment and furniture.

8. Building commissioning services.

9. LEED certification or similar design alternatives.

10. Fees required by governing agencies.

11. Identifying or abating asbestos, mold, lead paint, and/or other hazardous materials.

12. Illustrator perspective presentation drawing(s) for City review.

13. Preparation for and attendance of public hearings or City presentation meetings.

14. Preparation of as-built documents of architectural, structural, electrical, and mechanical conditions.

15. Fire protection systems (fire alarm design, fire sprinklers design, and/or fire suppression design, including smoke evacuation calculations and design).

16. Security, telecommunication data, cameras, or audio systems design.

17. Providing permitting criteria (building codes and permits, health department, etc.).

18. Construction contract administration.

19. Testing of materials within the building footprint limits.

20. Anything not described in this proposal.

Page 228 of 616 ends

October 16, 2023
Cudahy Park Renovation

Page 5 ends

Requested Information from City

1. Library building record drawings or construction drawings.

2. Any available record drawings, not limited to existing site plan, existing library building floor plans, building elevations, mechanical, electrical and plumbing drawings, etc.

3. Information regarding present structures, present zoning requirements, building restrictions in deed, property restrictions, and easements.

4. Necessary information regarding sewer, water, gas, and/or electrical services.

Scope of Work Assumptions

1. Unless noted otherwise, the scope of work assumes a single design iteration of each element and a single set of construction documents to be permitted in a single phase, and on a normal design-bid-build schedule.

2. Any revisions after permit submittal will be considered additional services.

3. Existing soil is not contaminated.

Respectfully Submitted,

WILLDAN ENGINEERING

John Hidalgo, RLA
Principal Project Manager
Landscape Architectural Services

Page 229 of 616 ends

Blank Page

Page 230 of 616 ends

“Serving The People” "Sirviendo A La Comunidad"
Staff Report
11/7/2023 Page 1 of 4

STAFF REPORT
Date: November 7, 2023
To: Honorable Mayor/Chair and City Council/Agency Members From: Alfonso Noyola, City Manager
By: Aaron Hernandez-Torres, Public Works Director/City Engineer Subject: Consideration to Approve a Contract Services Agreement to Award Unlimited Environmental, Inc., for the 5256 & 5260 Elizabeth St (SITE 1) Demolition Project

RECOMMENDATION
The City Council is requested to:

1. Approve a Contract Services Agreement with Unlimited Environmental, Inc., the lowest responsive and responsible bidder, for an amount of $99,400.00 to undertake the 5256 & 5260 Elizabeth St (SITE 1) Demolition Project.

BACKGROUND

1. On September 25, 2023, the Engineering Department in coordination with the City Clerk Office issued a Notice to Contractors to procure construction services for the aforementioned project. The project was properly advertised on September 25, 2023, and October 2, 2023, in the newspaper.

2. On October 12, 2023, the city conducted a mandatory pre-bid meeting at the site with all contractors interested in the project.

3. On October 19, 2023, the City Clerk’s Office conducted a bid opening ceremony at City Chambers. A total of three bids were received for this project, ranging in cost from $99,400 to $154,444 (Total Base Bid Amount). Unlimited Environmental, Inc. submitted a bid proposal in the total base bid amount of $99,400 and is the lowest responsive and responsible bidder.

Item Number
14E

Page 231 of 616 ends

“Serving The People” "Sirviendo A La Comunidad"
Staff Report
11/7/2023 Page 2 of 4

ANALYSIS
The City of Cudahy and its Redevelopment Dissolution Successor Agency own the properties located at 5256 & 5260 Elizabeth St (SITE 1) in the City of Cudahy, and currently vacant (also referred as, “Site 1”). The properties have suffered break-ins, congregations, people loitering, and the City has also observed evidence of fires and campsites and has had to respond to such on numerous occasions. The buildings have also sustained damage, including broken windows and steps, causing any immediate hazard to anyone who trespasses onto the Sites. Despite the constant efforts to secure the buildings from unlawful entry (including boarding up the properties), the conditions leave these properties very vulnerable, and the recurrence of these conditions is sure to increase with constant transients’ activity at the subject sites.

As it known the city and its Redevelopment Dissolution Successor Agency are in the process of considering selling and/or development on the subject sites. Accordingly, investing in repairing these buildings just to keep vagrants out is not financially feasible. Further, due to the economic downturn caused by the COVID-19 pandemic, the effort to secure a trusted full-time tenant on a temporary basis to fit the City’s needs with the hopes that occupancy of the building will mitigate the public safety and health hazards is not a practical option.

In order to keep these properties and area safe for the public and immediate adjacent neighbors, it is the City Staff recommendation to demolish and clean up these properties and remove and properly dispose existing debris. In addition, demolition of the red tagged existing structures will avoid future fires and to also stop transients coming in into the property looking for shelter. Furthermore, by completing this project the City will reduce/ avoid potential liability due to fire damage to adjacent and nearby properties, vandalism, and criminal activity from transients getting in and out of these properties.

The project scope of work for this demolition project includes without limitation, furnishing all necessary labor, materials, equipment, and other incidental and appurtenant Work necessary to satisfactorily complete the Project, consists of and includes demolition of building and predemolition haz-mat abatement and other relevant work at 5260 Elizabeth St (SITE 1) and 5256 Elizabeth St, Cudahy, CA 90201 as more specifically described in the Contract Documents.

The proposed project is categorically exempt pursuant to CEQA Guidelines (California Code of Regulations, Title 14, Division 6, Chapter 3, Sections 15000–15387), Article 19. Categorical Exemptions, Section 15301, Existing Facilities as a Class 1 paragraph (l) Demolition and removal of individual small structures listed in this subdivision.

Page 232 of 616 ends

“Serving The People” "Sirviendo A La Comunidad"
Staff Report
11/7/2023 Page 3 of 4
Site 1 Assessor Parcel Numbers (5256 & 5260 Elizabeth St) Street Address 2021 Assessor Parcel No.
5256 Elizabeth Street 6224-001-901
5260 Elizabeth Street 6224-001-902
City Staff followed the regular bidding process for this project per Public Works Contract Code.

In preparation for this, the Engineering Department (thru an environmental consultant) performed required hazmat testing and asbestos report for the Site. Accordingly, the Engineering Department in coordination with City Clerk Office issued a Notice to Contractors to procure construction services for the aforementioned project. The project was properly advertised on September 25, and October 2, 2023, in the newspaper. A bid opening ceremony took place on October 19, 2023, at City Chambers. A total of three bids were received for this project, ranging in cost from $99,400 to $154,444 (Total Bid Amount).

Unlimited Environmental, Inc. submitted a bid proposal in the total base bid amount of $99,400 and is the lowest responsive and responsible bidder.

CONCLUSION
City Council approval of the Construction Contract Services Agreement with Unlimited Environmental, Inc., would resolve the need of clean-up, maintenance, and transients’ activity in the above-mentioned 5256 & 5260 Elizabeth St (SITE 1) – City of Cudahy and its Redevelopment Dissolution Successor Agency. In addition, approval of the plan and associated contract will prevent much more costly maintenance and repairs in the future.

STRATEGIC PLAN CORRELATION
Goal E (City Infrastructure and Service Delivery)

FINANCIAL IMPACT
The funds of the Successor Agency Administration budget will be used to pay the contractor for this project.

Page 233 of 616 ends

“Serving The People” "Sirviendo A La Comunidad"
Staff Report
11/7/2023 Page 4 of 4

ATTACHMENTS
A. Bid Opening Minutes
B. Bid Proposal
C. Sample contract to be executed.

Page 234 of 616 ends

Attachment No. 2 –
Bid Opening Minutes
Attachment A Page 235 of 616

Page 236 of 616 ends
Page 237 of 616 ends

Attachment No. 3 –
Unlimited Environmental Inc. Bid
Attachment B Page 238 of 616

Page 239 of 616 ends
Page 240 of 616 ends
Page 241 of 616 ends
Page 242 of 616 ends
Page 243 of 616 ends
Page 244 of 616 ends
Page 245 of 616 ends
Page 246 of 616 ends
Page 247 of 616 ends
Page 248 of 616 ends
Page 249 of 616 ends
Page 250 of 616 ends
Page 251 of 616 ends
Page 252 of 616 ends
Page 253 of 616 ends
Page 254 of 616 ends
Page 255 of 616 ends
Page 256 of 616 ends
Page 257 of 616 ends
Page 258 of 616 ends
Page 259 of 616 ends
Page 260 of 616 ends
Page 261 of 616 ends
Page 262 of 616 ends
Page 263 of 616 ends
Page 264 of 616 ends
Page 265 of 616 ends
Page 266 of 616 ends
Page 267 of 616 ends
Page 268 of 616 ends

Attachment No. 1 –
Agreement with Unlimited Environmental Inc.

Attachment C

Page 269 of 616 ends

Page: APPENDIX A.1

CITY OF CUDAHY

PUBLIC WORKS CONTRACT
5256 & 5260 ELIZABETH ST (SITE 1) DEMOLITION PROJECT
CITY PROJECT # 100-4930-6724
THIS AGREEMENT “Agreement” is made and entered into this 7th day of November 2023, by and between the CITY OF CUDAHY, a Municipal Corporation located in the County of Los Angeles, State of California hereinafter called CITY, and UNITED ENVIRONMENTAL, INC. (hereinafter called “CONTRACTOR”). For the purposes of this Contract, CITY and CONTRACTOR may be referred to collectively referred to as the capitalized term “PARTIES”. The capitalized term “PARTY” may refer to CITY of CONTRACTOR interchangeably.

RECITALS
CITY, by its Notice Inviting Bids, duly advertised for written bids to be submitted on or before October 19th, 2023, for the following:
5256 & 5260 ELIZABETH ST (SITE 1) DEMOLITION PROJECT
CITY PROJECT # 100-4930-6724
in the City of CUDAHY, California, hereinafter called PROJECT.

At 3:00 pm on October 19th, 2023, on said date, in the CUDAHY Council Chambers, said bids were duly opened.

At its regular meeting held on ________________________, the CITY Council duly accepted the bid of CONTRACTOR for said PROJECT as being the lowest reasonable bid received and directed that a written contract be entered into with CONTRACTOR.

NOW, THEREFORE, in consideration of the promises and of the mutual covenants and agreements herein contained, said parties do hereby agree as follows:

ARTICLE I – CONTRACT DOCUMENTS
The CONTRACT DOCUMENTS for the PROJECT shall consist of:
• document titled:

CONTRACT DOCUMENTS PLANS AND SPECIFICATIONS
for
5256 & 5260 ELIZABETH ST (SITE 1) DEMOLITION PROJECT
CITY PROJECT # 100-4930-6724

Page 270 of 616 ends

Page: APPENDIX A.2
• CONTRACTOR’s Proposal
• Section 3 Clause & Requirements
• Federal Labor Standard Provisions
• Current Federal DOL Wage Decision
• Federal EEO and Affirmative Action Requirements
• and all referenced specifications, details, standard drawings, and appendices, together with this contract and all required bonds, insurance certificates, permits, notices and declarations, affidavits, and also including any and all addenda or supplemental agreements clarifying, amending, or extending the work contemplated as may be required to insure its completion in an acceptable manner.

All of the above-mentioned documents are intended to complement the other documents so that any work called for in one, and not mentioned in the others, or vice versa, is to be executed the same as if mentioned in all of said documents. The document comprising the complete contract are hereinafter referred to as the CONTRACT DOCUMENTS and are incorporated herein by this reference and made and part hereof as though they were fully set forth herein.

All of the rights and obligations of the CITY and CONTRACTOR are fully set forth and described in the CONTRACT DOCUMENTS.

In the event there is a conflict between the terms of the Contract Documents, the more specific or stringent provision shall govern. City shall decide which option is the more specific or stringent provision.

ARTICLE II - AGREEMENT
For and in consideration of the payments and agreements be made and performed by CITY, CONTRACTOR hereby agrees to furnish all materials and perform all work required for the PROJECT and to fulfill all other obligations as set forth in the CONTRACT DOCUMENTS.

ARTICLE III - COMPENSATION
CONTRACTOR hereby agrees to receive and accept the total amount Ninety Nine Thousand Four Hundred dollars ($99,400), based upon those certain unit prices set forth in CONTRACTOR’s Bid Schedule, a copy of which is attached hereto as Exhibit “A” and by this reference incorporated herein and made a part hereof, as full compensation for furnishing all materials, performing all work, and fulfilling all obligations hereunder.

Said compensation shall cover all expenses, losses, damages, and consequences arising out of the nature of the work during its progress or prior to its acceptance including those for well and faithfully completing the work and the whole thereof in the manner and time specified in the CONTRACT DOCUMENTS, and also including those arising from actions of the elements, unforeseen difficulties or obstructions encountered in the prosecution of the work, suspension or discontinuance of the work, and all other unknowns or risks of any description connected with the work.

Page 271 of 616 ends

Page: APPENDIX A.3
The sum identified in Article III is not subject to escalation, the CONTRACTOR having satisfied himself with said CONTRACT price, which includes all labor and material increases anticipated throughout the duration of this CONSTRUCTION CONTRACT.

CITY shall retain five percent (5%) of said CONTRACT price until said time as the provisions of Article XIV herein have been met.

Progress payments shall be made in accordance with Section 9 of the Standard Specifications for Public Works as amended by the General Provisions and Special Provisions.

Upon receipt of a properly presented payment request, the Contract Officer shall process the payment request in accordance with Public Contracts Code Section 20104.50. The Contract Officer shall review the payment request as soon as possible. If the Contract Officer rejects the payment request, it shall be returned to the Contractor within seven days of its receipt by the City with an explanation for the reasons of its rejection. If the payment request is approved in writing by the Contract Officer, payment shall be made within thirty (30) days of receipt of an undisputed and properly presented payment request. Late payments shall bear interest at the legal rate of interest in accordance with Code of Civil Procedure 685.010. City shall pay Contractor a sum based upon ninety-five percent (95%) of the contract price apportionment of the labor and materials incorporated into the work under the contract during the period covered by said statement. The remaining five percent (5%) thereof shall be retained as performance security.

Substitution of Securities for Retention. The contractor may deposit securities in lieu of the 5% progress payment retentions in accordance with California Public Contracts Code 22300.

CITY’s obligation is payable only and solely from Community Development Block Grant (CDBG) funds appropriated from the United States Department of Housing and Urban Development (HUD) and for the purpose of this CONTRACT. All funds are appropriated every fiscal year beginning July 1. In the event this CONTRACT extends into the succeeding fiscal year and funds have not been appropriated, this CONTRACT will automatically terminate as of June 30 of the current fiscal year. The CITY will notify the CONTRACTOR in writing in ten (10) days of receipt of the non-appropriation notice.

ARTICLE IV - CONTRACTOR REPRESENTATIONS
CITY hereby promises and agrees to employ, and does hereby employ, CONTRACTOR to provide the materials, do the work, and fulfill the obligations according to the terms and conditions herein contained and referred to, for the said amounts set forth in Article III hereof, and hereby agrees to pay the same at the time, in the manner, and upon the conditions set forth in the CONTRACT DOCUMENTS.

In addition, CONTRACTOR hereby promises and agrees to comply with all of the provisions of both State and Federal law with respect to the employment of unauthorized aliens.

Should CONTRACTOR so employ such unauthorized aliens for the performance of work and/or services covered by this contract, and should the Federal Government impose sanctions against the CITY for such use of unauthorized aliens, CONTRACTOR hereby agrees to, and shall, reimburse CITY for the cost of all such sanctions imposed, together with any and all costs, including attorney’s fees, incurred by the CITY in connection therewith.

Page 272 of 616 ends

Page: APPENDIX A.4
Furthermore, CONTRACTOR hereby represents and warrants that it is not currently, and has not at any time within the past five (5) calendar years been, suspended, debarred, or excluded from participating in, bidding on, contracting for, or completed any project funded in whole or in part by any federally funded program, grant or loan, or any project funded in whole or in part by a program, loan or grant from the State of California, and that CONTRACTOR currently has and for the past five (5) calendar years has maintained in good standing, a valid California contractor’s license. CONTRACTOR agrees to complete and execute any statement or certificate to this effect as may be required by the City or by any federal or State of California program, loan or grant utilized on this PROJECT.

ARTICLE V – COMMENCEMENT DATE
CONTRACTOR shall commence work on the date specified in the Notice to Proceed to be issued to said CONTRACTOR by the Director of Public Works of CITY and shall complete work on the PROJECT within 20 working days after commencement.

ARTICLE VI – NO DISCRIMINATION
CONTRACTOR shall not discriminate in its recruiting, hiring, promotion, demotion or termination practices on the basis of race, religious creed, color, national origin, ancestry, physical disability, mental disability, medical condition, marital status, sex, age, or sexual orientation in the performance of this CONTRACT and shall comply with the provisions of the California Fair Employment and Housing Act as set forth in Part 2.8 of Division 3, Title 2 of the California Government Code; the Federal Civil Rights Act of 1964, as set forth in Public Law 88-352, and all amendments thereto; Executive Order 11246; and all administrative rules and regulations issued pursuant to such acts and order.

CONTRACTOR hereby promises and agrees to comply with all of the provisions of the Federal Immigration and Nationality Act (8 USCA 1101, et seq.), as amended; and, in connection therewith, shall not employ unauthorized aliens as defined therein. Should CONTRACTOR so employ such unauthorized aliens for the performance of work and/or services covered by this AGREEMENT, and should the Federal Government impose sanctions against the CITY for such use of unauthorized aliens, CONTRACTOR hereby agrees to, and shall, reimburse CITY for the cost of all such sanctions imposed, together with any and all costs, including attorney’s fees, incurred by the CITY in connection therewith.

ARTICLE VII – LABOR CODE REQUIREMENTS
Compliance with SB 854 Registration: This Work is subject to compliance monitoring and enforcement by the Department of Industrial Relations. No prime contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. No prime contractor or subcontractor may be awarded a contract for public work on a public works project (awarded on or after April 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. The Contractor will be required to post job site notices as described in 8 California Code of Regulation section 16451(d).

Page 273 of 616 ends

Page: APPENDIX A.5
Contractor acknowledges that under California Labor Code sections 1810 and following, 8 hours of labor constitutes a legal day’s work. Contractor will forfeit as a penalty to City the sum of $25.00 for each worker employed in the execution of this Agreement by Contractor or any subcontractor for each calendar day during which such worker is required or permitted to work more than 8 hours in any one calendar day and 40 hours in any one calendar week in violation of the provisions of Labor Code section 1810. (Labor Code § 1813).

Copies of the determination of the Director of the Department of Industrial Relations of the prevailing rate of per diem wages for each craft, classification or type of worker needed to execute this Agreement will be made available upon request from the City Engineer’s Office.

Contractor must post at the work site, or if there is no regular work site then at its principal office, for the duration of the Contract, a copy of the determination by the Director of the Department of Industrial Relations of the specified prevailing rate of per diem wages. (Labor Code § 1773.2). The Contractor shall post WH-1321 ENGLISH and WH-1321 SPANISH at the work site.

Contractor, and any subcontractor engaged by Contractor, must pay not less than the specified prevailing rate of per diem wages to all workers employed in the execution of the contract. (Labor Code § 1774.) Contractor is responsible for compliance with Labor Code section 1776 relative to the retention and inspection of payroll records.

Contractor must comply with all provisions of Labor Code section 1775. Under Section 1775, Contractor may forfeit as a penalty to City up to $50.00 for each worker employed in the execution of the Contract by Contractor or any subcontractor for each calendar day, or portion thereof, in which the worker is paid less than the prevailing rates. Contractor may also be liable to pay the difference between the prevailing wage rates and the amount paid to each worker for each calendar day, or portion thereof, for which each worker was paid less than the prevailing wage rate.

Nothing in this Contract prevents Contractor or any subcontractor from employing properly registered apprentices in the execution of the Contract. Contractor is responsible for compliance with Labor Code section 1777.5 for all apprenticeable occupations. This statute requires that contractors and subcontractors must submit contract award information to the applicable joint apprenticeship committee, must employ apprentices in apprenticeable occupations in a ratio of not less than one hour of apprentice’s work for every five hours of labor performed by a journeyman (unless an exception is granted under §1777.5), must contribute to the fund or funds in each craft or trade or a like amount to the California Apprenticeship Council, and that contractors and subcontractors must not discriminate among otherwise qualified employees as apprentices solely on the ground of sex, race, religion, creed, national origin, ancestry or color. Only apprentices defined in Labor Code section 3077, who are in training under apprenticeship standards and who have written apprentice contracts, may be employed on public works in apprenticeable occupations.

This is a federally-assisted CONSTRUCTION CONTRACT. Federal Labor Standards Provisions, including prevailing wage requirements of the Davis-Bacon and Related Acts will be enforced. In the event of a conflict between Federal and State wages rates, the higher of the two will prevail. Modification of Federal Wage Rates published within ten (10) days prior to the scheduled Bid Opening date shall apply to the contract.

Page 274 of 616 ends

Page: APPENDIX A.6
The Contractor shall submit payroll records to the City weekly for each week in which any contract work is performed. The Contractor is also responsible for the submission of payroll records by all its Subcontractors performing any contract work on this Project.

The payroll records submitted shall set out accurately and completely all of the information required to be maintained under Section 5.5(a) (3) (i) of 29 C.F.R. Part 5. Each payroll submitted shall be accompanied by a Statement of Compliance signed by the Contractor or Subcontractor or his or her agent who pays or supervises the payment of the persons employed under the Contract, and shall certify the following:
• The payroll records for the payroll period contains the information required to be maintained under Section 5.5(a)(3)(i) of 29 C.F.R. Part 5, and that such information is correct and complete; • Each employee employed on the contract during the payroll period has been paid the full weekly wages earned, without rebate, either directly or indirectly, and that no deductions have been made either directly or indirectly from the full wages earned, other than permissible deductions as set forth in Regulations, 29 C.F.R. Part 3;
• Each employee has been paid not less than the applicable wage rates and fringe benefits or cash equivalents for the classification of work performed, as specified in the applicable wage determination incorporated into the Contract.

This information may be submitted in any form desired, however, Form WH-347 is provided as an optional template. The Contractor shall submit a Statement of Non-Performance for each week of work for which craft work was not performed.

The falsification of any of the above certifications may subject the Contractor or Subcontractor to civil or criminal prosecution under Section 1001 of Title 18 and Section 231 of Title 31 of the United States Code.

The Contractor shall submit copies of apprentice certification(s) for each apprentice performing work on the Contract to accompany the first payroll record in which that apprentice appears. The City will recognize apprentice certifications from the U.S. Department of Labor and the California Division of Apprenticeship Standards. Any worker listed on a payroll at an apprentice wage rate, who is not registered or otherwise employed as stated above, shall be paid not less than the applicable wage rate on the wage determination for the classification of work actually performed.

The CONTRACTOR’s duty to pay State prevailing wages can be found under Labor Code Section 1770 et q. and Labor Code Sections 1775 and 1777.7 outline the penalties for failure to pay prevailing wages and employ apprentices including forfeitures and debarment.

The Contractor agrees that the City, through its authorized representatives, has the right, at all reasonable times, to make site visits to review Project accomplishments and for other reasons, such as employee interviews. If any site visit is made by the City on the premises of the Contractor or any of its Subcontractors under this Contract, the Contractor shall provide and shall require its Subcontractors to provide, all reasonable facilities and assistance for the safety and convenience of City representatives in the performance of their duties. All site visits and evaluations shall be performed in such a manner as will not unduly delay work being conducted by the Contractor or Subcontractor(s).

If the work involves excavation of any trench five feet or more in depth the contractor shall submit a detailed plan of shoring, bracing, sloping or other provisions to be made for worker protection. Such plan shall be approved by a qualified representative of the City. (LC 6705).

Page 275 of 616 ends

Page: APPENDIX A.7

ARTICLE VIII - PROVISIONS REQUIRED BY LAW
Each and every provision of law required to be included in these Contract Documents shall be deemed to be included in these Contract Documents. The Contractor shall comply with all requirements of applicable federal, state and local laws, rules and regulations, including, but not limited to, the provisions of the California Labor Code and California Public Contract Code which are applicable to this Project. Such laws, rules and regulations shall include, but not be limited to the following.

Contractor’s License.

The Contractor shall possess a type Class B, C21, C22, ASB, HAZ California Contractor's license at the time of award of the Contract.

Ineligible Contractor Prohibited.

Any contractor or subcontractor who is ineligible to perform work on a public works project pursuant to Section 1777.1 or 1777.7 of the Labor Code is prohibited from performing work under this Contract.

Unfair Business Practices Claims.

The Contractor or subcontractor offers and agrees to assign to the City all rights, title, and interest in and to all causes of action it may have under Section 4 of the Clayton Act (15 U.S.C. Section 15) or under the Cartwright Act (Chapter 2, (commencing with Section 16700) of Part 2 of Division 7 of the Business and Professions Code), arising from purchases of goods, services or materials pursuant to the public works contract or the subcontract. This assignment shall be made and become effective at the time the City renders final payment to the Contractor without further acknowledgment by the parties. (Section 7103.5, California Public Contract Code.).

Hazardous Materials and Unknown Conditions.

A. CONTRACTOR shall, without disturbing the condition, notify CITY in writing as soon as CONTRACTOR, or any of CONTRACTOR’s subcontractors, agents or employees have knowledge and reporting is possible, of the discovery of any of the following conditions:

1. The presence of any material that the CONTRACTOR believes is hazardous waste, as defined in Section 25117 of the Health and Safety Code;

2. Subsurface or latent physical conditions at the site differing from those indicated in the specifications; or,

3. Unknown physical conditions at the site of any unusual nature, different materially from those ordinarily encountered and generally recognized as inherent in work of this character provided for in this Contract.

B. Pending a determination by CITY of appropriate action to be taken, CONTRACTOR shall provide security measures (e.g., fences) adequate to prevent the hazardous waste or physical conditions from causing bodily injury to any person.

C. CITY shall promptly investigate the reported conditions. If CITY, through its Director of Public Works, or her designee, and in the exercise of its sole discretion, determines that the conditions

Page 276 of 616 ends

Page: APPENDIX A.8
do materially differ, or do involve hazardous waste, and will cause a decrease or increase in the CONTRACTOR’s cost of, or time required for, performance of any part of the work, then CITY shall issue a change order.

D. In the event of a dispute between CITY and CONTRACTOR as to whether the conditions materially differ, or involve hazardous waste, or cause a decrease or increase in the CONTRACTOR’s cost of, or time required for, performance of any part of the work, CONTRACTOR shall not be excused from any scheduled completion date, and shall proceed with all work to be performed under the Contract. CONTRACTOR shall retain any and all rights which pertain to the resolution of disputes and protests between the parties.

ARTICLE IX - INDEMNITY
CONTRACTOR shall assume the defense of and indemnify and save harmless the CITY, its elective and appointive boards, officers, agents and employees, and volunteers from all claims, loss, damage, injury and liability of every kind, nature and description, directly or indirectly arising from the performance of the CONTRACTOR’s work, regardless of responsibility of negligence; and from any and all claims, loss, damage, injury and liability, howsoever the same may be caused, resulting directly or indirectly from the nature of the work covered by the contract, regardless of responsibility of negligence; provided (a) That CITY does not, and shall not, waive any rights against CONTRACTOR which it may have by reason for the aforesaid hold-harmless AGREEMENT because of the acceptance by CITY or the deposit with CITY by CONTRACTOR, of any of the insurance policies hereinafter described in this AGREEMENT. (b) That the aforesaid hold-harmless AGREEMENT by CONTRACTOR shall apply to all damages and claims for damages of every kind suffered, or alleged to have been suffered, by reason of any of the aforesaid operations of CONTRACTOR, or any subcontractor, regardless of whether or not such insurance policies shall have been determined to be applicable to any of such damages or claims for damages.

Page 277 of 616 ends

Page: APPENDIX A.9

ARTICLE X - BONDS
Warranty & Guarantee
New Materials. Contractor guarantees that all materials and equipment furnished will be new unless otherwise specified in the Contract Documents.

One Year Guarantee. Contractor guarantees all materials and equipment furnished and Work performed for a period of one (1) year from the date of substantial completion is free from all defects due to faulty materials or workmanship. Contractor shall promptly make such corrections as may be necessary by reasons of such defects including the repairs of any damage to other property, whether real or personal.

The City will give notice of observed defects with reasonable promptness. If Contractor fails to make such repairs, or other Work that may be made necessary by such defects, the City may do so and charge the Contractor the cost thereby incurred, plus 10% for administrative expenses. The Performance Bond shall remain in full force and effect through the guarantee period. Contractor shall execute the Public Improvement Warranty.

Bonds.

Contractor shall provide a payment bond consistent with the terms of this section and City may not waive this requirement. Contractor shall also provide a performance bond consistent with the terms of this section, unless City waives such requirement in writing. Each bond shall (1) be in writing; (2) signed by at least one admitted surety insurer under oath; (3) if a bond is signed by more than one surety insurer, include a statement that the sureties are jointly and severally liable on the obligations required hereunder; (4) list the address at which the principal and surety/sureties may be served with notices, papers, and other documents under this chapter; (5) be in the form of a bond and not in a deposit in lieu of a bond; (6) be consistent with any other requirements of the City that reasonably relate to a guarantee that the project will be completed at no cost to the City.

Payment Bond. Contractor shall furnish and file with City a bond in the sum of one hundred percent (100%) of the Compensation. Consistent with Civil Code § 3248, the bond shall provide that if the Contractor or any subcontractors hired by Contractor fails to pay (1) any of the persons named in Civil Code § 3181; (2) amounts due under the Unemployment Insurance Code with respect to work or labor performed under this Agreement; or (3) for any amounts required to be deducted, withheld, and paid over to the Employment Development Department from the wages of employees of the contractor and subcontractors pursuant to Unemployment Insurance Code §13020 with respect to the work and labor that the sureties will pay for the same, and also, in case suit is brought upon the bond, a reasonable attorney’s fee, to be fixed by the court. The bond shall, by its terms, inure to the benefit of any of the persons named in Civil Code § 3181 so as to give a right of action to those persons or their assigns in any suit brought upon the bond. The bond provided under this section shall be released by written authorization of the City Engineer at the completion of the one year warranty period described in section 0, above, provided that Contractor is not in default on any provision of this Agreement.

Performance Bond. Contractor shall provide City with a bond in the sum of one hundred percent (100%) of the Compensation to guarantee the completion of the Work, to protect City if Developer is in default of this Agreement, and to secure Contractor’s one-year guarantee and warranty. The City Council may, in its sole and absolute discretion and upon recommendation of the City Engineer, partially release a portion or portions of the security provided under this section as the Public Improvements are accepted by City,

Page 278 of 616 ends

Page: APPENDIX A.10
provided that Contractor is not in default on any provision of this Agreement. All security provided under this section shall be released at the end of the warranty period described in section 0, above, provided that Contractor is not in default on any provision of this Agreement.

ARTICLE XI - INSURANCE
CONTRACTOR shall not commence work under this contract until CONTRACTOR shall have obtained all insurance required by the CONTRACT DOCUMENTS and such insurance shall have been approved by CITY as to form, amount and carrier, nor shall CONTRACTOR allow any subcontractor to commence work on any subcontract until all similar insurance required of the subcontractor shall have been so obtained and approved.
(a) COMPENSATION INSURANCE - CONTRACTOR shall take out and maintain, during the life of this contract, Worker’s Compensation Insurance for all of CONTRACTOR’s employees employed at the site of improvement; and, if any work is sublet, CONTRACTOR shall require the subcontractor similarly to provide Worker’s Compensation Insurance for all of the latter’s employees, unless such employees are covered by the protection afforded by CONTRACTOR. If any class of employees engaged in work under this contract at the site of the PROJECT is not protected under any Workers’ Compensation law, CONTRACTOR shall provide and shall cause each subcontractor to provide adequate insurance for the protection of employees not otherwise protected. CONTRACTOR shall indemnify CITY for any damage resulting to it from failure of either CONTRACTOR or any subcontractor to take out or maintain such insurance.
(b) COMPREHENSIVE GENERAL LIABILITY, PRODUCTS/ COMPLETED OPERATIONS

HAZARD, COMPREHENSIVE AUTOMOBILE LIABILITY AND CONTRACTUAL GENERAL LIABILITY INSURANCE. CONTRACTOR shall take out and maintain during the life of this contract such comprehensive general liability, products/completed operations hazard, comprehensive automobile liability and contractual general liability insurance as shall protect CITY, its elective and appointive boards, officers, agents and employees, CONTRACTOR, and any subcontractor performing work covered by this contract, from claims for damage for personal injury, including death, as well as from claims for property damage which may arise from CONTRACTOR’s or any subcontractor’s operations under this contract, whether such operations be by CONTRACTOR or by any subcontractor, or by anyone directly or indirectly employed by either CONTRACTOR or any subcontractor, and the amounts of such insurance shall be as follows:
(1) Public Liability Insurance in an amount of not less than TWO MILLION DOLLARS ($2,000,000);
(2) Products/Completed Operations Hazard Insurance in an amount of not less than TWO MILLION DOLLARS ($2,000,000);
(3) Comprehensive Automobile Liability Insurance in an amount of not less

Page 279 of 616 ends

Page: APPENDIX A.11
than TWO MILLION DOLLARS ($2,000,000);
(4) Contractual General Liability Insurance in an amount of not less than TWO MILLION DOLLARS ($2,000,000).

A combined single limit policy with aggregate limits in an amount of not less than TWO MILLION DOLLARS ($2,000,000) shall be considered equivalent to the said required minimum limits set forth hereinabove.
(c) PROOF OF INSURANCE - The insurance required by this AGREEMENT shall be with insurers which are Best A rated, and California Admitted or better. The CITY and shall be named as “additional insured” on all policies required hereunder, and CONTRACTOR shall furnish CITY, concurrently with the execution hereof, with satisfactory proof of carriage of the insurance required, and adequate legal assurance that each carrier will give CITY at least thirty (30) days’ prior notice of the cancellation of any policy during the effective period of the contract. (d) NOTICE TO COMMENCE WORK - The CITY will not issue any notice authorizing CONTRACTOR or any subcontractor to commence work under this contact until CONTRACTOR has provided to the CITY the proof of insurance as required by subparagraph (c) of this article.

ARTICLE XII - ATTORNEY FEES
If either party to this Contract is required to initiate or defend, or is made a party to, any action or proceeding in any way connected with this Contract, the party prevailing in the final judgment in such action or proceeding, in addition to any other relief which may be granted, shall be entitled to reasonable attorney’s fees and costs. Attorney’s fees shall include reasonable costs for investigating such action.

ARTICLE XIII - LIQUIDATED DAMAGES
The parties agree that it would be impractical and extremely difficult to fix the actual damages to the CITY in the event the PROJECT is not commenced and/or completed on or before the dates specified for commencement and completion of the PROJECT in the CONTRACT DOCUMENTS. The parties have considered the facts of a breach of this contract and have agreed that the liquidated damages sum hereinafter set forth is reasonable as liquidated damages in the event of a breach, and that said sum shall be presumed to be the amount of the damages sustained by the CITY in the event such work is not begun and/or completed and accepted by the times so specified in the CONTRACT DOCUMENTS, the sum of Five Hundred Dollars ($500) shall be presumed to be the amount of damages suffered by the CITY for each calendar day’s delay in the starting and/or completion and acceptance of said PROJECT after the dates specified in the CONTRACT DOCUMENTS for the start and/or completion thereof, and CONTRACTOR hereby agrees to pay said sum of Five Hundred Dollars ($500) as liquidated damages for each calendar day of delay in the starting and/or completing and acceptance of said PROJECT beyond the dates specified in the CONTRACT DOCUMENTS. Any and all such liquidated damages assessed shall be done so in accordance with that certain edition of the Standard Specification for Public Works Construction currently in effect on the execution date of this CONTRACT. The payment of such liquidated damages is not

Page 280 of 616 ends

Page: APPENDIX A.12
intended as a forfeiture or penalty within the meaning of California Civil Code § 3275 or § 3369.

CONTRACTOR: UNITED ENVIRONMENTAL, INC. CITY OF CUDAHY
a California Corporation a Municipal Corporation
by:___________________________ by:____________________________ President Mayor

ARTICLE XIV - NOTICE OF COMPLETION
Upon completion of PROJECT and acceptance of same by the CITY Council, the CITY Manager shall have cause to be recorded a Notice of Completion with the office of the Los Angeles County Recorder; and, after thirty-five (35) days from the date said Notice of Completion is recorded, the Director of Finance of CITY shall release the funds retained pursuant to Article III hereof; provided there have been no mechanics’ liens or stop notices filed against said work which have not been paid, withdrawn or eliminated as liens against said work.

ARTICLE XV - NO - ASSIGNMENT
This contract shall not be assignable, either in whole or in part, by the CONTRACTOR without first obtaining the written consent of the CITY thereto.

ARTICLE XVI - CUMULATIVE RIGHTS
The provisions of this AGREEMENT are cumulative and in addition to and not in limitation of any rights or remedies available to CITY.

ARTICLE XVII - TERMINATION
A. Termination for Convenience. The CITY may terminate this contract, in whole or in part, with 30 days written notice to the CONTRACTOR when it is in the CITY’s best interest. The CONTRACTOR shall be paid its costs, including contract close-out costs, and profit on work performed up to the time of termination. The CONTRACTOR shall promptly submit its termination claim to CITY to be paid the CONTRACTOR. If the CONTRACTOR has any property in its possession belonging to the CITY, the CONTRACTOR will account for the same, and dispose of it in the manner the CITY directs. The CONTRACTOR may terminate this contract, in whole, with 90 days written notice to the CITY.

B. Termination for Default. If at any time the CONTRACTOR is determined to be in material breach of the Contract, a Notice of Potential Breach of Contract shall be prepared by the CITY, and will be served upon the CONTRACTOR and its sureties. If the CONTRACTOR continues to neglect or refuses to comply with the Contract or with the Notice of Potential Breach of Contract to the satisfaction of the CITY within the time specified in such Notice, the CITY shall have the authority to terminate the Contract for this Project.

Page 281 of 616 ends

Page: APPENDIX A.13
C. Waiver of Remedies for any Breach. In the event that CITY elects to waive its remedies for any breach by CONTRACTOR of any covenant, term or condition of this Contract, such waiver by CITY shall not limit CITY’s remedies for any succeeding breach of that or of any other term, covenant, or condition of the Contract.

ARTICLE XVIII – FEDERAL REQUIREMENTS
Notwithstanding any other provision of this Agreement, if the construction work covered under this Agreement is financed in whole or in part with assistance provided under a program of the U.S.

Department of Housing and Urban Development or some other source of Federal funding, Contractor shall also comply with and cause its subcontractors to comply with the requirements of the Davis-Bacon Act (40 U.S.C. 276 et seq.). The Davis-Bacon Act requires the payment of wages to all laborers and mechanics at a rate not less than the minimum wage specified by the Secretary of Labor in the periodic wage rate determinations as described in the Federal Labor Standards Provisions (HUD-4010) available from the Agency’s Compliance Division. If Contractor is required to comply with the Davis-Bacon Act, Contractor shall pay the higher of Davis-Bacon Act or state prevailing wages, on a trade-by-trade basis.

By entering into this Agreement, Contractor certifies that it is not a person or firm ineligible to be awarded Government contracts by virtue of Section 3(a) of the Davis-Bacon Act or 29 CFR 5.12(a)(1) or if HUD funds are involved, to be awarded HUD contracts or participate in HUD programs pursuant to 24 CFR Part 24.

Contractor agrees to include, or cause to be included, the above provision, to be applicable to contractors and subcontractors, in each contract and subcontract for work covered under this Agreement.

Contractor shall comply with all mandatory standards and policies relating to energy efficiency which are contained in the state energy conservation plan issued in compliance with the Energy Policy and Conservation Act.

The City, the federal grantor agency, the Comptroller General of the United States, or any of their duly authorized representatives shall have access to any books, documents papers and records of the Contractor and any subcontractors which are directly pertinent to this Agreement, for the purpose of making audit, examination, excerpts and transcriptions. Contractor shall maintain all required records for three years after City makes final payments and all other pending matters are closed.

Contractor shall comply with the Copeland “Anti-Kick Back” Act, 18 U.S.C. §874, as supplemented in Department of Labor regulations. (29 C.F.R. part 3.)
Contractor shall ensure compliance with sections 103 and 107 of the Contract Work Hours and Safety Standards Act, 40 U.S.C. §§ 327 – 33, as supplemented by Department of Labor regulations. See 29 C.F.R. part 5.

Contractor and any subcontractors must comply with Executive Order 11246 as amended by Executive Order 11375 and as supplemented in Department of Labor regulations. (41 C.F.R. part 3.) If the Compensation exceeds $100,000, Contractor shall comply with all applicable standards, orders, or requirements issued under section 306 of the Clean Air Act, Section 508 of the Clean Water Act, Executive Order 11738, and Environmental Protection Agency (EPA) regulations, which prohibit the use under nonPage 282 of 616 Page: APPENDIX A.14
exempt federal contracts, grants or loans of facilities included on the EPA List of Violating Facilities. (See e.g. 47 C.F.R. §18.36(i)(12).)
If the Compensation exceeds $100,000 for construction or facility improvements, Contractor must observe the building requirements contained in Attachment B of OMB Circular A-110. --------SIGNATURES ON FOLLOWING PAGE--------

Page 283 of 616 ends

Page: APPENDIX A.15
IN WITNESS WHEREOF, the parties hereto have caused this contract to be executed on the _____ day of _____________________, 20__, by their respective officers duly authorized in that behalf.

CITY OF CUDAHY CONTRACTOR___________________________
a Municipal Corporation a California Corporation
by:______________________________
________________, Mayor by:______________________________ President
by:_______________________________
ATTEST: Secretary
by:_______________________________
________________, City Clerk

APPROVED AS TO FORM
by: _______________________________
________________, City Attorney

Page 284 of 616 ends

Page: APPENDIX A.16

PUBLIC IMPROVEMENTS WARRANTY
5256 & 5260 ELIZABETH ST (SITE 1) DEMOLITION PROJECT
CITY PROJECT # 100-4930-6724
On ________________________, 20__, the City of CUDAHY accepted as complete and meeting the standards of City, the following public improvement(s):
_____________________________________________________________________________________ _____________________________________________________________________________________ _____________________________________, built and constructed by or for _____________________, ("Contractor")
Contractor hereby warrants and guarantees the aforementioned public improvements as to the material used and workmanship performed for a period of one (1) year following the date set forth above.

In the event of a defect, malfunction, or failure to conform t the improvement specifications and all applicable local standards, the Contractor shall repair or replace said improvements at Contractor's own and sole expense within a reasonable time from notice of the defect from City. Should Contractor fail to cure any defect within a reasonable period of time, Contractor agrees to reimburse City for any and all costs of City's efforts to cure any defect once City has provided notice to the Contractor of the defect and the City's intent to cure such defect.

Should litigation be necessary to enforce the provisions of this warranty, the prevailing party shall be entitled to reimbursement for attorneys fees and court and related costs.

Executed at _________________________, California, on the day and year first written above.

CONTRACTOR
By:__________________________
Signature
By:__________________________
(Typed Name)
Its:__________________________
Title
By:__________________________
Signature
By:__________________________
(Typed Name)
Its:__________________________
Title
[NOTARY REQUIRED]

Page 285 of 616 ends

Page: APPENDIX A.17

FAITHFUL PERFORMANCE BOND
5256 & 5260 ELIZABETH ST (SITE 1) DEMOLITION PROJECT
CITY PROJECT # 100-4930-6724
KNOW ALL MEN BY THESE PRESENTS that _____________________________________________, as CONTRACTOR and_____________________________________, as SURETY, are held and firmly bound unto the City of CUDAHY, in the penal sum of _________________________________________dollars ($ ), which is 100 percent of the total contract amount for the above stated project, for the payment of which sum, CONTRACTOR and SURETY agree to be bound, jointly and severally, firmly by these presents.

THE CONDITIONS OF THIS OBLIGATION ARE SUCH that, whereas CONTRACTOR has been awarded and is about to enter into the annexed Contract with the City for the above stated project, if CONTRACTOR faithfully performs and fulfills all obligations under the contract documents in the manner and time specified therein, then this obligation shall be null and void, otherwise it shall remain in full force and effect in favor of the City; provided that any alternations in the obligations or time for completion made pursuant to the terms of the contract documents shall not in any way release either CONTRACTOR or SURETY, and notice of such alternations are hereby waived by SURETY.

IN WITNESS WHEREOF the parties hereto have set their names, titles, hands, and seals this ____day of _____________, 20 .

CONTRACTOR* _________________________________________________________________________

_________________________________________________________________________ SURETY*
_________________________________________________________________________

_________________________________________________________________________ * Provide CONTRACTOR/SURETY name, address and telephone number and the name, title, address and telephone number for authorized representative.

Subscribed and sworn to this ______ day of _______________, 20__.

NOTARY PUBLIC:_______________________________________________________

Page 286 of 616 ends

Page: APPENDIX A.18

MATERIAL AND LABOR BOND
5256 & 5260 ELIZABETH ST (SITE 1) DEMOLITION PROJECT
CITY PROJECT # 100-4930-6724
KNOW ALL MEN BY THESE PRESENTS that _____________________________________________, as CONTRACTOR and_____________________________________, as SURETY, are held and firmly bound unto the City of CUDAHY, in the penal sum of _________________________________________dollars ($ ), which is 100 percent of the total contract amount for the above stated project, for the payment of which sum, CONTRACTOR and SURETY agree to be bound, jointly and severally, firmly by these presents.

THE CONDITIONS OF THIS OBLIGATION ARE SUCH that, whereas CONTRACTOR has been awarded and is about to enter into the annexed Contract with the City for the above stated project, if CONTRACTOR faithfully performs and fulfills all obligations under the contract documents in the manner and time specified therein, then this obligation shall be null and void, otherwise it shall remain in full force and effect in favor of the City; provided that any alternations in the obligations or time for completion made pursuant to the terms of the contract documents shall not in any way release either CONTRACTOR or SURETY, and notice of such alternations are hereby waived by SURETY.

IN WITNESS WHEREOF the parties hereto have set their names, titles, hands, and seals this ____day of _____________, 20 .

CONTRACTOR* ____________________________________________________________

_________________________________________________________________________ SURETY*
_________________________________________________________________________ ______________________________________________________________________ * Provide CONTRACTOR/SURETY name, address and telephone number and the name, title, address and telephone number for authorized representative.

Subscribed and sworn to this ______ day of _______________, 20__.

NOTARY PUBLIC:______________________________________________________

Page 287 of 616 ends

Blank Page

Page 288 of 616 ends

“Serving The People” "Sirviendo A La Comunidad"

Staff Report
11/7/2023 Page 1 of 3

STAFF REPORT
Date: November 7, 2023
To: Honorable Mayor/Chair and City Council/Agency Members From: Alfonso Noyola, City Manager
By: Aaron Hernandez-Torres, Public Works Director/City Engineer Subject: Consideration to Approve a Contract Services Agreement to Award American Pride Builders Co. for the Clara Park Improvement Project, 4835 Clara St, Cudahy, CA 90201

RECOMMENDATION
The City Council is requested to:

1. Approve a Contract Services Agreement with American Pride Builders Co., the lowest responsive and responsible bidder, for an amount of $205,730.00 to undertake the Clara Park Improvement Project, 4835 Clara St, Cudahy, CA 90201.

2. Adopt proposed Resolution No. 23-50 Augmenting the City of Cudahy Fiscal Year (FY 2023- 2024 City Budget).

BACKGROUND

1. On September 18, 2023, the Engineering Department in coordination with City Clerk Office issued a Notice to Contractors to procure construction services for the aforementioned project. The project was properly advertised on September 18, 2023, and September 25, 2023, in the newspaper.

2. On September 28, 2023, the city conducted a mandatory pre-bid meeting at the site with all contractors interested in the project.

3. On October 10, 2023, the City Clerk’s Office conducted a bid opening ceremony at City Chambers. One bid was received for this project for $205,730 (Total Base Bid Amount).

American Pride Builders Co. submitted a bid proposal in the total base bid amount of Item Number
14F

Page 289 of 616 ends

“Serving The People” "Sirviendo A La Comunidad"

Staff Report
11/7/2023 Page 2 of 3

$205,730 and is the only responsive and responsible bidder.

ANALYSIS
The City of Cudahy needs new office spaces due to staff augmentation at the Clara Park Community Center, located at 4835 Clara St, Cudahy, CA 90201 in the City of Cudahy. In addition to the new office spaces, there is a need for additional security for staff vehicle which was added to the Bid Package.

The project scope of work for this project includes, without limitation, furnishing all necessary labor, materials, equipment, and other incidental and appurtenant Work necessary to satisfactorily complete the Project, which consists of and includes Interior work: two new offices, front lobby and gym lobby waiting area. Demolition of double swing doors, counters, ceiling, lighting, and other relevant work as needed. Installation of walls, noise/soundproofing insulation, doors, bulletin board, ceiling tiles, electrical outlets, light fixtures, and vents. Exterior work: new commercial vehicular sliding gate, solid single swing gate in between building.

Demolition of single swing gate, double swing gates, asphalt paving, trenching, and turf area between building and trash enclosure. Installation of sliding gate, single swing gates including hardware, electrical conduit to run from Electrical room to sliding gate motor at Clara Park, 4835 Clara St, Cudahy, CA 90201 as more specifically described in the Contract Documents.

City Staff followed the regular bidding process for this project per Public Works Contract Code.

In preparation for this, the Engineering Department (thru an environmental consultant) performed required hazmat testing and asbestos report for the Site. Accordingly, the Engineering Department in coordination with City Clerk Office issued a Notice to Contractors to procure construction services for the aforementioned project. The project was properly advertised on September 18, 2023, and September 25, 2023, in the newspaper. One bid was received for this project for $205,730 (Total Base Bid Amount).

American Pride Builders Co. submitted a bid proposal in the total base bid amount of $205,780 and is the only responsive and responsible bidder.

CONCLUSION
City Council approval of the Construction Contract Services Agreement with American Pride Builders Co. for the Clara Park Improvement Project, 4835 Clara St, Cudahy, CA 90201.

STRATEGIC PLAN CORRELATION

Page 290 of 616 ends

“Serving The People” "Sirviendo A La Comunidad"

Staff Report
11/7/2023 Page 3 of 3

Goal E (City Infrastructure and Service Delivery)

FINANCIAL IMPACT
General Funds in the amount of $82,425 will be used to pay for the construction of the new offices. This project expense has been included in the FY 23/24 City’s Budget (Account No. 100- 4020-6955-000 Facility Improvements).

Development Impact Fees Fund in the amount of $123,305 will be used to pay for the exterior work and installation of a new commercial vehicular sliding gate and all required appurtenances to complete the work.

ATTACHMENTS
A. Draft Resolution No. 23-50 – Budget Augmentation
B. Budget Amendment Detail
C. Bid Opening Minutes
D. Bid Proposal
E. Sample contract to be executed.

Page 291 of 616 ends

1 RESOLUTION NO. 23-50

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF

CUDAHY, CALIFORNIA AUGMENTING ITS OPERATING
AND CAPITAL BUDGET FOR THE 2023-2024 FISCAL
YEAR
WHEREAS, the budget for fiscal year 2023-2024 of the City of Cudahy has been adopted by this Council in its original form and said budget will need to be augmented at times to fulfill the goals of the City; and
WHEREAS, the City departments my not exceed their appropriations by character of expenditure with the charact of expenditure being defined as personnel services, operating costs, and capital expenditures and transfers without the consent of the City Manager; and
WHEREAS, the City Manager and Finance Director may transfer appropriations, between accounts, departments, programs and funds, as long as those appropriations do not exceed the grant total budget approved by Council; and

NOW, THEREFORE, BE IT RESOLVED, DETERMINED AND ORDERED BY THE CITY COUNCIL OF THE CITY OF CUDAHY, CALIFORNIA, AS FOLLOWS:

SECTION 1. The City Council of the City of Cudahy augments its Fiscal Year 2023-2024 budget as defined in Attachment B to the Staff Report accompanying this resolution per the budget augmentation recommendations.

PASSED, APPROVED, AND ADOPTED by the City Council of the City of Cudahy at the regular meeting of this 7th day of November 2023. ______________________________
Daisy Lomelí
Mayor
ATTEST:
____________________________
Richard Iglesias
City Clerk
Attachment A Page 292 of 616
Resolution No. 23-50

Page 2 of 2 ends

2 CERTIFICATION

STATE OF CALIFORNIA )
COUNTY OF LOS ANGELES ) SS:

CITY OF CUDAHY )
I, Richard Iglesias, City Clerk of the City of Cudahy, hereby certify that the foregoing Resolution No. 23-50 was passed and adopted by the City Council of the City of Cudahy, signed by the Mayor and attested by the City Clerk at a regular meeting of said Council held on the 7th day of November 2023 and that said Resolution was adopted by the following vote, to-wit:

AYES:

NOES:

ABSENT:

ABSTAIN:

Richard Iglesias
City Clerk

Page 293 of 616 ends

City of Cudahy
Budget Augmentation
Fiscal Year 2023-24
Council
Appropriation
Account Revenue/ Request
Number Expenditure Fund Department Description FY 2023-24 Comment 392-0000-4841-000 Revenue
Development
Impact Fees Non Departmental Development Impact Fees 123,305 Receipt of one-time funds recevied to utilize towards facilities project 392-42xx-69xx-000 Expenditure
Development
Impact Fees Project Fund Facilities Improvements 123,305 Commercial vehicular sliding gate for Clara Park Attachment B Page 294 of 616
Attachment No. 2 –
Bid Opening Minutes
Attachment C Page 295 of 616

Page 296 of 616 ends
Page 297 of 616 ends

Attachment No. 3 –
American Pride Builders Co. Bid
Attachment D

Page 298 of 616 ends
Page 299 of 616 ends
Page 300 of 616 ends
Page 301 of 616 ends
Page 302 of 616 ends
Page 303 of 616 ends
Page 304 of 616 ends
Page 305 of 616 ends
Page 306 of 616 ends
Page 307 of 616 ends
Page 308 of 616 ends
Page 309 of 616 ends
Page 310 of 616 ends
Page 311 of 616 ends
Page 312 of 616 ends
Page 313 of 616 ends
Page 314 of 616 ends
Page 315 of 616 ends
Page 316 of 616 ends
Page 317 of 616 ends
Page 318 of 616 ends
Page 319 of 616 ends
Page 320 of 616 ends
Page 321 of 616 ends
Page 322 of 616 ends
Page 323 of 616 ends
Page 324 of 616 ends
Page 325 of 616 ends
Page 326 of 616 ends
Page 327 of 616 ends
Page 328 of 616 ends
Page 329 of 616 ends
Page 330 of 616 ends
Page 331 of 616 ends
Page 332 of 616 ends
Page 333 of 616 ends
Page 334 of 616 ends
Page 335 of 616 ends
Page 336 of 616 ends
Page 337 of 616 ends

Attachment No. 2 –
Bid Opening Minutes

Page 338 of 616 ends

Attachment No. 1 –
Agreement with American Pride Builders Co.

Attachment E Page 339 of 616
Page: APPENDIX A.1

CITY OF CUDAHY

PUBLIC WORKS CONTRACT
Clara Park Improvement Project
4835 Clara St, Cudahy, CA 90201
CITY PROJECT #100-40200-6995
THIS AGREEMENT “Agreement” is made and entered into this 7th day of November 2023, by and between the CITY OF CUDAHY, a Municipal Corporation located in the County of Los Angeles, State of California hereinafter called CITY, and AMERICAN PRIDE BUILDERS CO.(hereinafter called “CONTRACTOR”). For the purposes of this Contract, CITY and CONTRACTOR may be referred to collectively referred to as the capitalized term “PARTIES”. The capitalized term “PARTY” may refer to CITY of CONTRACTOR interchangeably.

RECITALS
CITY, by its Notice Inviting Bids, duly advertised for written bids to be submitted on or before October 10th, 2023, for the following:

Clara Park Improvement Project
4835 Clara St, Cudahy, CA 90201
CITY PROJECT #100-40200-6995
in the City of CUDAHY, California, hereinafter called PROJECT.

At 3:00 pm on October 10th, 2023 on said date, in the CUDAHY Council Chambers, said bids were duly opened.

At its regular meeting held on ________________________, the CITY Council duly accepted the bid of CONTRACTOR for said PROJECT as being the lowest reasonable bid received and directed that a written contract be entered into with CONTRACTOR.

NOW, THEREFORE, in consideration of the promises and of the mutual covenants and agreements herein contained, said parties do hereby agree as follows:

ARTICLE I – CONTRACT DOCUMENTS
The CONTRACT DOCUMENTS for the PROJECT shall consist of:
• document titled:

CONTRACT DOCUMENTS PLANS AND SPECIFICATIONS
for
Clara Park Improvement Project
4835 Clara St, Cudahy, CA 90201
CITY PROJECT #100-40200-6995

Page 340 of 616 ends

Page: APPENDIX A.2
• CONTRACTOR’s Proposal
• Section 3 Clause & Requirements
• Federal Labor Standard Provisions
• Current Federal DOL Wage Decision
• Federal EEO and Affirmative Action Requirements
• and all referenced specifications, details, standard drawings, and appendices, together with this contract and all required bonds, insurance certificates, permits, notices and declarations, affidavits, and also including any and all addenda or supplemental agreements clarifying, amending, or extending the work contemplated as may be required to insure its completion in an acceptable manner.

All of the above-mentioned documents are intended to complement the other documents so that any work called for in one, and not mentioned in the others, or vice versa, is to be executed the same as if mentioned in all of said documents. The document comprising the complete contract are hereinafter referred to as the CONTRACT DOCUMENTS and are incorporated herein by this reference and made and part hereof as though they were fully set forth herein.

All of the rights and obligations of the CITY and CONTRACTOR are fully set forth and described in the CONTRACT DOCUMENTS.

In the event there is a conflict between the terms of the Contract Documents, the more specific or stringent provision shall govern. City shall decide which option is the more specific or stringent provision.

ARTICLE II - AGREEMENT
For and in consideration of the payments and agreements be made and performed by CITY, CONTRACTOR hereby agrees to furnish all materials and perform all work required for the PROJECT and to fulfill all other obligations as set forth in the CONTRACT DOCUMENTS.

ARTICLE III - COMPENSATION
CONTRACTOR hereby agrees to receive and accept the total amount Two Hundred Five Thousand Seven Hundred Thirty dollars ($205,730), based upon those certain unit prices set forth in CONTRACTOR’s Bid Schedule, a copy of which is attached hereto as Exhibit “A” and by this reference incorporated herein and made a part hereof, as full compensation for furnishing all materials, performing all work, and fulfilling all obligations hereunder.

Said compensation shall cover all expenses, losses, damages, and consequences arising out of the nature of the work during its progress or prior to its acceptance including those for well and faithfully completing the work and the whole thereof in the manner and time specified in the CONTRACT DOCUMENTS, and also including those arising from actions of the elements, unforeseen difficulties or obstructions encountered in the prosecution of the work, suspension or discontinuance of the work, and all other unknowns or risks of any description connected with the work.

Page 341 of 616 ends

Page: APPENDIX A.3
The sum identified in Article III is not subject to escalation, the CONTRACTOR having satisfied himself with said CONTRACT price, which includes all labor and material increases anticipated throughout the duration of this CONSTRUCTION CONTRACT.

CITY shall retain five percent (5%) of said CONTRACT price until said time as the provisions of Article XIV herein have been met.

Progress payments shall be made in accordance with Section 9 of the Standard Specifications for Public Works as amended by the General Provisions and Special Provisions.

Upon receipt of a properly presented payment request, the Contract Officer shall process the payment request in accordance with Public Contracts Code Section 20104.50. The Contract Officer shall review the payment request as soon as possible. If the Contract Officer rejects the payment request, it shall be returned to the Contractor within seven days of its receipt by the City with an explanation for the reasons of its rejection. If the payment request is approved in writing by the Contract Officer, payment shall be made within thirty (30) days of receipt of an undisputed and properly presented payment request. Late payments shall bear interest at the legal rate of interest in accordance with Code of Civil Procedure 685.010. City shall pay Contractor a sum based upon ninety-five percent (95%) of the contract price apportionment of the labor and materials incorporated into the work under the contract during the period covered by said statement. The remaining five percent (5%) thereof shall be retained as performance security.

Substitution of Securities for Retention. The contractor may deposit securities in lieu of the 5% progress payment retentions in accordance with California Public Contracts Code 22300.

CITY’s obligation is payable only and solely from Community Development Block Grant (CDBG) funds appropriated from the United States Department of Housing and Urban Development (HUD) and for the purpose of this CONTRACT. All funds are appropriated every fiscal year beginning July 1. In the event this CONTRACT extends into the succeeding fiscal year and funds have not been appropriated, this CONTRACT will automatically terminate as of June 30 of the current fiscal year. The CITY will notify the CONTRACTOR in writing in ten (10) days of receipt of the non-appropriation notice.

ARTICLE IV - CONTRACTOR REPRESENTATIONS
CITY hereby promises and agrees to employ, and does hereby employ, CONTRACTOR to provide the materials, do the work, and fulfill the obligations according to the terms and conditions herein contained and referred to, for the said amounts set forth in Article III hereof, and hereby agrees to pay the same at the time, in the manner, and upon the conditions set forth in the CONTRACT DOCUMENTS.

In addition, CONTRACTOR hereby promises and agrees to comply with all of the provisions of both State and Federal law with respect to the employment of unauthorized aliens.

Should CONTRACTOR so employ such unauthorized aliens for the performance of work and/or services covered by this contract, and should the Federal Government impose sanctions against the CITY for such use of unauthorized aliens, CONTRACTOR hereby agrees to, and shall, reimburse CITY for the cost of all such sanctions imposed, together with any and all costs, including attorney’s fees, incurred by the CITY in connection therewith.

Page 342 of 616 ends

Page: APPENDIX A.4
Furthermore, CONTRACTOR hereby represents and warrants that it is not currently, and has not at any time within the past five (5) calendar years been, suspended, debarred, or excluded from participating in, bidding on, contracting for, or completed any project funded in whole or in part by any federally funded program, grant or loan, or any project funded in whole or in part by a program, loan or grant from the State of California, and that CONTRACTOR currently has and for the past five (5) calendar years has maintained in good standing, a valid California contractor’s license. CONTRACTOR agrees to complete and execute any statement or certificate to this effect as may be required by the City or by any federal or State of California program, loan or grant utilized on this PROJECT.

ARTICLE V – COMMENCEMENT DATE
CONTRACTOR shall commence work on the date specified in the Notice to Proceed to be issued to said CONTRACTOR by the Director of Public Works of CITY and shall complete work on the PROJECT within 20 working days after commencement.

ARTICLE VI – NO DISCRIMINATION
CONTRACTOR shall not discriminate in its recruiting, hiring, promotion, demotion or termination practices on the basis of race, religious creed, color, national origin, ancestry, physical disability, mental disability, medical condition, marital status, sex, age, or sexual orientation in the performance of this CONTRACT and shall comply with the provisions of the California Fair Employment and Housing Act as set forth in Part 2.8 of Division 3, Title 2 of the California Government Code; the Federal Civil Rights Act of 1964, as set forth in Public Law 88-352, and all amendments thereto; Executive Order 11246; and all administrative rules and regulations issued pursuant to such acts and order.

CONTRACTOR hereby promises and agrees to comply with all of the provisions of the Federal Immigration and Nationality Act (8 USCA 1101, et seq.), as amended; and, in connection therewith, shall not employ unauthorized aliens as defined therein. Should CONTRACTOR so employ such unauthorized aliens for the performance of work and/or services covered by this AGREEMENT, and should the Federal Government impose sanctions against the CITY for such use of unauthorized aliens, CONTRACTOR hereby agrees to, and shall, reimburse CITY for the cost of all such sanctions imposed, together with any and all costs, including attorney’s fees, incurred by the CITY in connection therewith.

ARTICLE VII – LABOR CODE REQUIREMENTS
Compliance with SB 854 Registration: This Work is subject to compliance monitoring and enforcement by the Department of Industrial Relations. No prime contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. No prime contractor or subcontractor may be awarded a contract for public work on a public works project (awarded on or after April 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. The Contractor will be required to post job site notices as described in 8 California Code of Regulation section 16451(d).

Page 343 of 616 ends

Page: APPENDIX A.5
Contractor acknowledges that under California Labor Code sections 1810 and following, 8 hours of labor constitutes a legal day’s work. Contractor will forfeit as a penalty to City the sum of $25.00 for each worker employed in the execution of this Agreement by Contractor or any subcontractor for each calendar day during which such worker is required or permitted to work more than 8 hours in any one calendar day and 40 hours in any one calendar week in violation of the provisions of Labor Code section 1810. (Labor Code § 1813).

Copies of the determination of the Director of the Department of Industrial Relations of the prevailing rate of per diem wages for each craft, classification or type of worker needed to execute this Agreement will be made available upon request from the City Engineer’s Office.

Contractor must post at the work site, or if there is no regular work site then at its principal office, for the duration of the Contract, a copy of the determination by the Director of the Department of Industrial Relations of the specified prevailing rate of per diem wages. (Labor Code § 1773.2). The Contractor shall post WH-1321 ENGLISH and WH-1321 SPANISH at the work site.

Contractor, and any subcontractor engaged by Contractor, must pay not less than the specified prevailing rate of per diem wages to all workers employed in the execution of the contract. (Labor Code § 1774.) Contractor is responsible for compliance with Labor Code section 1776 relative to the retention and inspection of payroll records.

Contractor must comply with all provisions of Labor Code section 1775. Under Section 1775, Contractor may forfeit as a penalty to City up to $50.00 for each worker employed in the execution of the Contract by Contractor or any subcontractor for each calendar day, or portion thereof, in which the worker is paid less than the prevailing rates. Contractor may also be liable to pay the difference between the prevailing wage rates and the amount paid to each worker for each calendar day, or portion thereof, for which each worker was paid less than the prevailing wage rate.

Nothing in this Contract prevents Contractor or any subcontractor from employing properly registered apprentices in the execution of the Contract. Contractor is responsible for compliance with Labor Code section 1777.5 for all apprenticeable occupations. This statute requires that contractors and subcontractors must submit contract award information to the applicable joint apprenticeship committee, must employ apprentices in apprenticeable occupations in a ratio of not less than one hour of apprentice’s work for every five hours of labor performed by a journeyman (unless an exception is granted under §1777.5), must contribute to the fund or funds in each craft or trade or a like amount to the California Apprenticeship Council, and that contractors and subcontractors must not discriminate among otherwise qualified employees as apprentices solely on the ground of sex, race, religion, creed, national origin, ancestry or color. Only apprentices defined in Labor Code section 3077, who are in training under apprenticeship standards and who have written apprentice contracts, may be employed on public works in apprenticeable occupations.

This is a federally-assisted CONSTRUCTION CONTRACT. Federal Labor Standards Provisions, including prevailing wage requirements of the Davis-Bacon and Related Acts will be enforced. In the event of a conflict between Federal and State wages rates, the higher of the two will prevail. Modification of Federal Wage Rates published within ten (10) days prior to the scheduled Bid Opening date shall apply to the contract.

Page 344 of 616 ends

Page: APPENDIX A.6
The Contractor shall submit payroll records to the City weekly for each week in which any contract work is performed. The Contractor is also responsible for the submission of payroll records by all its Subcontractors performing any contract work on this Project.

The payroll records submitted shall set out accurately and completely all of the information required to be maintained under Section 5.5(a) (3) (i) of 29 C.F.R. Part 5. Each payroll submitted shall be accompanied by a Statement of Compliance signed by the Contractor or Subcontractor or his or her agent who pays or supervises the payment of the persons employed under the Contract, and shall certify the following:
• The payroll records for the payroll period contains the information required to be maintained under Section 5.5(a)(3)(i) of 29 C.F.R. Part 5, and that such information is correct and complete; • Each employee employed on the contract during the payroll period has been paid the full weekly wages earned, without rebate, either directly or indirectly, and that no deductions have been made either directly or indirectly from the full wages earned, other than permissible deductions as set forth in Regulations, 29 C.F.R. Part 3;
• Each employee has been paid not less than the applicable wage rates and fringe benefits or cash equivalents for the classification of work performed, as specified in the applicable wage determination incorporated into the Contract.

This information may be submitted in any form desired, however, Form WH-347 is provided as an optional template. The Contractor shall submit a Statement of Non-Performance for each week of work for which craft work was not performed.

The falsification of any of the above certifications may subject the Contractor or Subcontractor to civil or criminal prosecution under Section 1001 of Title 18 and Section 231 of Title 31 of the United States Code.

The Contractor shall submit copies of apprentice certification(s) for each apprentice performing work on the Contract to accompany the first payroll record in which that apprentice appears. The City will recognize apprentice certifications from the U.S. Department of Labor and the California Division of Apprenticeship Standards. Any worker listed on a payroll at an apprentice wage rate, who is not registered or otherwise employed as stated above, shall be paid not less than the applicable wage rate on the wage determination for the classification of work actually performed.

The CONTRACTOR’s duty to pay State prevailing wages can be found under Labor Code Section 1770 et q. and Labor Code Sections 1775 and 1777.7 outline the penalties for failure to pay prevailing wages and employ apprentices including forfeitures and debarment.

The Contractor agrees that the City, through its authorized representatives, has the right, at all reasonable times, to make site visits to review Project accomplishments and for other reasons, such as employee interviews. If any site visit is made by the City on the premises of the Contractor or any of its Subcontractors under this Contract, the Contractor shall provide and shall require its Subcontractors to provide, all reasonable facilities and assistance for the safety and convenience of City representatives in the performance of their duties. All site visits and evaluations shall be performed in such a manner as will not unduly delay work being conducted by the Contractor or Subcontractor(s).

If the work involves excavation of any trench five feet or more in depth the contractor shall submit a detailed plan of shoring, bracing, sloping or other provisions to be made for worker protection. Such plan

Page 345 of 616 ends

Page: APPENDIX A.7
shall be approved by a qualified representative of the City. (LC 6705).

ARTICLE VIII - PROVISIONS REQUIRED BY LAW
Each and every provision of law required to be included in these Contract Documents shall be deemed to be included in these Contract Documents. The Contractor shall comply with all requirements of applicable federal, state and local laws, rules and regulations, including, but not limited to, the provisions of the California Labor Code and California Public Contract Code which are applicable to this Project. Such laws, rules and regulations shall include, but not be limited to the following.

Contractor’s License.

The Contractor shall possess a type Class B California Contractor's license at the time of award of the Contract.

Ineligible Contractor Prohibited.

Any contractor or subcontractor who is ineligible to perform work on a public works project pursuant to Section 1777.1 or 1777.7 of the Labor Code is prohibited from performing work under this Contract.

Unfair Business Practices Claims.

The Contractor or subcontractor offers and agrees to assign to the City all rights, title, and interest in and to all causes of action it may have under Section 4 of the Clayton Act (15 U.S.C. Section 15) or under the Cartwright Act (Chapter 2, (commencing with Section 16700) of Part 2 of Division 7 of the Business and Professions Code), arising from purchases of goods, services or materials pursuant to the public works contract or the subcontract. This assignment shall be made and become effective at the time the City renders final payment to the Contractor without further acknowledgment by the parties. (Section 7103.5, California Public Contract Code.).

Hazardous Materials and Unknown Conditions.

A. CONTRACTOR shall, without disturbing the condition, notify CITY in writing as soon as CONTRACTOR, or any of CONTRACTOR’s subcontractors, agents or employees have knowledge and reporting is possible, of the discovery of any of the following conditions:

1. The presence of any material that the CONTRACTOR believes is hazardous waste, as defined in Section 25117 of the Health and Safety Code;

2. Subsurface or latent physical conditions at the site differing from those indicated in the specifications; or,

3. Unknown physical conditions at the site of any unusual nature, different materially from those ordinarily encountered and generally recognized as inherent in work of this character provided for in this Contract.

B. Pending a determination by CITY of appropriate action to be taken, CONTRACTOR shall provide security measures (e.g., fences) adequate to prevent the hazardous waste or physical conditions from causing bodily injury to any person.

Page 346 of 616 ends

Page: APPENDIX A.8
C. CITY shall promptly investigate the reported conditions. If CITY, through its Director of Public Works, or her designee, and in the exercise of its sole discretion, determines that the conditions do materially differ, or do involve hazardous waste, and will cause a decrease or increase in the CONTRACTOR’s cost of, or time required for, performance of any part of the work, then CITY shall issue a change order.

D. In the event of a dispute between CITY and CONTRACTOR as to whether the conditions materially differ, or involve hazardous waste, or cause a decrease or increase in the CONTRACTOR’s cost of, or time required for, performance of any part of the work, CONTRACTOR shall not be excused from any scheduled completion date, and shall proceed with all work to be performed under the Contract. CONTRACTOR shall retain any and all rights which pertain to the resolution of disputes and protests between the parties.

ARTICLE IX - INDEMNITY
CONTRACTOR shall assume the defense of and indemnify and save harmless the CITY, its elective and appointive boards, officers, agents and employees, and from all claims, loss, damage, injury and liability of every kind, nature and description, directly or indirectly arising from the performance of the CONTRACTOR’s work, regardless of responsibility of negligence; and from any and all claims, loss, damage, injury and liability, howsoever the same may be caused, resulting directly or indirectly from the nature of the work covered by the contract, regardless of responsibility of negligence; provided (a) That CITY does not, and shall not, waive any rights against CONTRACTOR which it may have by reason for the aforesaid hold-harmless AGREEMENT because of the acceptance by CITY or the deposit with CITY by CONTRACTOR, of any of the insurance policies hereinafter described in this AGREEMENT. (b) That the aforesaid hold-harmless AGREEMENT by CONTRACTOR shall apply to all damages and claims for damages of every kind suffered, or alleged to have been suffered, by reason of any of the aforesaid operations of CONTRACTOR, or any subcontractor, regardless of whether or not such insurance policies shall have been determined to be applicable to any of such damages or claims for damages.

Page 347 of 616 ends

Page: APPENDIX A.9

ARTICLE X - BONDS
Warranty & Guarantee
New Materials. Contractor guarantees that all materials and equipment furnished will be new unless otherwise specified in the Contract Documents.

One Year Guarantee. Contractor guarantees all materials and equipment furnished and Work performed for a period of one (1) year from the date of substantial completion is free from all defects due to faulty materials or workmanship. Contractor shall promptly make such corrections as may be necessary by reasons of such defects including the repairs of any damage to other property, whether real or personal. The City will give notice of observed defects with reasonable promptness. If Contractor fails to make such repairs, or other Work that may be made necessary by such defects, the City may do so and charge the Contractor the cost thereby incurred, plus 10% for administrative expenses. The Performance Bond shall remain in full force and effect through the guarantee period.

Contractor shall execute the Public Improvement Warranty.

Bonds.

Contractor shall provide a payment bond consistent with the terms of this section and City may not waive this requirement. Contractor shall also provide a performance bond consistent with the terms of this section, unless City waives such requirement in writing. Each bond shall (1) be in writing; (2) signed by at least one admitted surety insurer under oath; (3) if a bond is signed by more than one surety insurer, include a statement that the sureties are jointly and severally liable on the obligations required hereunder; (4) list the address at which the principal and surety/sureties may be served with notices, papers, and other documents under this chapter; (5) be in the form of a bond and not in a deposit in lieu of a bond; (6) be consistent with any other requirements of the City that reasonably relate to a guarantee that the project will be completed at no cost to the City.

Payment Bond. Contractor shall furnish and file with City a bond in the sum of one hundred percent (100%) of the Compensation. Consistent with Civil Code § 3248, the bond shall provide that if the Contractor or any subcontractors hired by Contractor fails to pay (1) any of the persons named in Civil Code § 3181; (2) amounts due under the Unemployment Insurance Code with respect to work or labor performed under this Agreement; or (3) for any amounts required to be deducted, withheld, and paid over to the Employment Development Department from the wages of employees of the contractor and subcontractors pursuant to Unemployment Insurance Code §13020 with respect to the work and labor that the sureties will pay for the same, and also, in case suit is brought upon the bond, a reasonable attorney’s fee, to be fixed by the court. The bond shall, by its terms, inure to the benefit of any of the persons named in Civil Code § 3181 so as to give a right of action to those persons or their assigns in any suit brought upon the bond. The bond provided under this section shall be released by written authorization of the City Engineer at the completion of the one year warranty period described in section 0, above, provided that Contractor is not in default on any provision of this Agreement.

Performance Bond. Contractor shall provide City with a bond in the sum of one hundred percent (100%) of the Compensation to guarantee the completion of the Work, to protect City if Developer is in default of this Agreement, and to secure Contractor’s one-year guarantee and warranty. The City Council may, in its sole and absolute discretion and upon recommendation of the City Engineer, partially release a portion or portions of the security provided under this section as the Public Improvements are accepted

Page 348 of 616 ends

Page: APPENDIX A.10
by City, provided that Contractor is not in default on any provision of this Agreement. All security provided under this section shall be released at the end of the warranty period described in section 0, above, provided that Contractor is not in default on any provision of this Agreement.

ARTICLE XI - INSURANCE
CONTRACTOR shall not commence work under this contract until CONTRACTOR shall have obtained all insurance required by the CONTRACT DOCUMENTS and such insurance shall have been approved by CITY as to form, amount and carrier, nor shall CONTRACTOR allow any subcontractor to commence work on any subcontract until all similar insurance required of the subcontractor shall have been so obtained and approved.
(a) COMPENSATION INSURANCE - CONTRACTOR shall take out and maintain, during the life of this contract, Worker’s Compensation Insurance for all of CONTRACTOR’s employees employed at the site of improvement; and, if any work is sublet, CONTRACTOR shall require the subcontractor similarly to provide Worker’s Compensation Insurance for all of the latter’s employees, unless such employees are covered by the protection afforded by CONTRACTOR. If any class of employees engaged in work under this contract at the site of the PROJECT is not protected under any Workers’ Compensation law, CONTRACTOR shall provide and shall cause each subcontractor to provide adequate insurance for the protection of employees not otherwise protected. CONTRACTOR shall indemnify CITY for any damage resulting to it from failure of either CONTRACTOR or any subcontractor to take out or maintain such insurance. (b) COMPREHENSIVE GENERAL LIABILITY, PRODUCTS/ COMPLETED OPERATIONS

HAZARD, COMPREHENSIVE AUTOMOBILE LIABILITY AND CONTRACTUAL GENERAL LIABILITY INSURANCE. CONTRACTOR shall take out and maintain during the life of this contract such comprehensive general liability, products/completed operations hazard, comprehensive automobile liability and contractual general liability insurance as shall protect CITY, its elective and appointive boards, officers, agents and employees, CONTRACTOR, and any subcontractor performing work covered by this contract, from claims for damage for personal injury, including death, as well as from claims for property damage which may arise from CONTRACTOR’s or any subcontractor’s operations under this contract, whether such operations be by CONTRACTOR or by any subcontractor, or by anyone directly or indirectly employed by either CONTRACTOR or any subcontractor, and the amounts of such insurance shall be as follows:
(1) Public Liability Insurance in an amount of not less than TWO MILLION DOLLARS ($2,000,000);
(2) Products/Completed Operations Hazard Insurance in an amount of not less than TWO MILLION DOLLARS ($2,000,000);

Page 349 of 616 ends
← All documents from this meeting