Cities Index.
22-01-24_ATT No 2_Comprehensive Plan Amendment P2021-0174-CPA.pdf

City Council Meeting Agenda
January 24, 2022

Document
22-01-24_ATT No 2_Comprehensive Plan Amendment P2021-0174-CPA.pdf
Meeting
January 24, 2022
Body
City Council Meeting Agenda
Original file
98.6 MB
Text extracted from the city's file for reading and search. Open the original on culver-city.legistar1.com. That file is the official record.

COMPREHENSIVE PLAN, AMENDMENT #1

WENDE MUSEUM - CREATIVE COMMUNITY CENTER
ADDRESS:10808 –10860 CULVER BOULEVARD, CULVER CITY, CA (LOTS 9 -30) OCTOBER 2021

AUX ARCHITECTURE
2021.10.20

CULVER CITY COMPREHENSIVE PLAN

CONTENT
TABLE OF CONTENTS 01

PROJECT SUMMARY & CONTEXT

i. PROJECT SUMMARY 02
ii. PROJECT CONTEXT 02
iii. PROJECT OBJECTIVES 02
iv. EXISTING CONDITIONS
a. EXISTING PROJECT SITE AERIAL 03
b. EXISTING PROJECT SITE PLAN 04
c. EXISTING PROJECT SITE AXONOMETRIC 06
v. COMPREHENSIVE PLAN PHASES 07

PHASE ONE - AREA 1: WENDE MUSEUM
i. PHASE ONE OBJECTIVES 08
ii. EXISTING CONDITIONS
a. EXISTING WENDE MUSEUM PHOTOS 09
c . EXISTING WENDE FLOOR PLANS 10
d. EXISTING WENDE ELEVATIONS 13

PHASE TWO - AREA 2: CREATIVE COMMUNITY CENTER
i. PHASE TWO OBJECTIVES 14
ii. EXISTING CONDITIONS
a. EXISTING WENDE MUSEUM PHOTOS 16
b. EXISTING & DEMO FLOOR PLANS 17
c. EXISTING & DEMO ELEVATIONS 18
ii. PROPOSED PROJECT SITE AXONOMETRIC 19
iv. PROPOSED PROJECT SITE PLAN 20
v. ENLARGED PROPOSED PROJECT SITE PLAN 21
vi. PROPOSED PROJECT FLOOR PLANS 22
vii. PROPOSED ELEVATIONS & EXISTING ELEVATIONS 28
viii. PROPOSED MATERIAL BOARD 32
ix. PROPOSED EXTERIOR RENDERINGS 33
PHASE THREE - AREA 3: COMMUNITY GARDEN AND AFFORDABLE HOUSING i. PHASE THREE OBJECTIVES 39
ii. PROJECT SITE AXONOMETRIC 40
iii. PROJECT SITE PLAN 41
iv. EXTERIOR RENDERINGS 42

LAND USE & SITE DEVELOPMENT STANDARDS
i. GENERAL PLAN 44
ii. ZONING 44
iii. LAND USES 45
iv. SPECIAL & TEMPORARY EVENTS 46
v. DEVELOPMENT STANDARDS 46
vi. PARKING 47
vii. LANDSCAPE & HARDSCAPE PALETTE
a. EXISTING LANDSCAPE 49
b. PROPOSED LANDSCAPE 50
ix. SIGNAGE 59
a. EXISTING SIGNAGE 60
b. PROPOSED SIGNAGE 61
x. PROPOSED LIGHTING 63
xi. CIVIL
a, EXISTING SITE SURVEY 71
b. PROPOSED CIVIL 73
xii. RECREATIONAL ACTIVITY PROGRAMMING 78
xiii. SAFETY & SECURITY 79
xiv. MOBILITY & TRANSPORTATION DEMAND MANAGEMENT 80
xv. SUSTAINABILITY 81
FOOTNOTES 82

AUX ARCHITECTURE
2021.10.20
01 CULVER CITY COMPREHENSIVE PLAN

PROJECT SUMMARY & CONTEXT
Project Summary and Background
The Wende Museum and Archive of the Cold War Inc. (the “Wende”), a 501(c)(3) non-profit organization, is an art museum, historical archive, and center for community engagement. In 2014, the City adopted by Ordinance No. 2014-001, a Comprehensive Plan CP P2013176 (the “Comprehensive Plan”) for the Wende Museum at the Armory (the “Museum”), encompassing approximately 38,305 square feet (Lots 14-30 of Tract 9974, “Area 1”) of a larger parcel (Lots 1-30), measuring 1.55 acres (49,571.25 square feet), to facilitate the Museum’s use of the 13,073 square foot Armory building located at 10808 Culver Boulevard (Phase One). Pursuant to the Comprehensive Plan, the Wende Museum has made its home at the Armory since 2017.

Comprehensive Plan Amendment No. 1 (“Amendment No. 1”) expands the boundaries of the Comprehensive Plan to encompass an additional 11,267 square feet (Lots 9-13 of Tract 9974) (the “Expansion Area”) of property to the west of the existing Museum site, for a total of 49,571 square feet of lot area (1.12 acres for lots 9-30).

The Expansion Area is comprised of two areas, which includes 6,759.75 square feet to be used for a Creative Community Center (“Area 2”) and 4,507 square feet to be used for future affordable housing and community garden (“Area 3”). The purpose of Amendment No. 1 is to provide for the redevelopment of 1) the former AmVets property at 10858 Culver Boulevard (Lots 11, 12, and 13 of Tract 9974) into a new Creative Community Center adjacent to the Museum (“Phase Two”), and 2) the westerly portion of the Expansion Area (Lots 9 and 10 of Tract 9974) to include a publicly-accessible garden and up to six affordable housing units (“Phase Three”). Inclusive of the proposed Expansion Area, the new boundary of the Comprehensive Plan is referred to herein as the “Project Site.” Under Phase Two, Amendment No. 1 would allow the demolition of a 2,200 square foot building and construction of 5,102 square feet of new space on Area 2. An existing 1,920 square foot A-Frame building at the site will be retained and combined with the new 5,102 square feet to create a 7,022 square foot Creative Community Center.

The proposed uses for the Creative Community Center include meeting and gathering spaces, archives and artifact storage, presentation, and conservation; a demonstration garden; lectures and conferences; programs; tutoring; art classes; music and dancing events; celebrations; and performances. The existing garden at the Museum would be expanded to connect and integrate the new development with the existing Museum and sculpture garden. Phase Three will allow for the future repurposing of the existing community garden space on Area 3 to accommodate the development of six affordable housing units and a new publicly accessible garden.

Consistent with the Culver City Municipal Code (CCMC), the amended Comprehensive Plan is anticipated to be completed within four years of Amendment No. 1’s approval. Implementation of Phase Two is scheduled to commence shortly after approval of Amendment No. 1, with construction anticipated to begin in January 2022 and be completed by the end of 2022. Implementation of Phase Three will proceed subject to City approval of required permits a Planning Commission design conformance review.

Project Context
The Site anchors a mile-long stretch of arts venues along Culver Boulevard, including several dozen permanent public art installations, live music venues and theaters (The Actors’ Gang, Kirk Douglas Theatre) and museums (The Wende Museum and the Culver City Historical Society). It connects the downtown arts district with the 405 Freeway, the city’s westside artery, creating a “cultural corridor” .” The Museum repurposed a former armory that had been used as a seasonal homeless shelter and the surrounding open land, establishing a new cultural landmark for Culver City. The Site is located on the south side of Culver Boulevard, between Coombs Avenue and Elenda Street.

It is surrounded predominantly by residential subdivisions to the north, south, and west, and by Veterans Park to the east. The Site is fronted by a wide surface public parking lot and concrete sidewalk extending the entire length of this block and the block to the east (in front of Veterans Memorial Park). A wide landscaped median containing evergreen trees separates the parking lot and sidewalk from Culver Boulevard. The parcel area between the Site’s western boundary and Elenda Street are occupied by the Boy Scouts Hut and Rock and Mineral Club (10866 Culver Blvd), and paddle tennis courts.

Project Objectives
• Demonstrate a comprehensive vision for the future growth and development of the site with a focus on culture, art, and affordable housing.
• Create a ‘master plan’ that identifies permitted uses that contribute to the community and the City’s cultural resources.
• Strengthen the identity and impact of the “Culver City Cultural Corridor” • Provide for the development of affordable housing units that have a synergy with the Wende Museum and Creative Community Center and the surrounding community. • Holistically address complimentary City priorities of fostering cultural resources and creation of affordable housing.
• Adaptively reuse existing resources in promotion of City priorities.

AUX ARCHITECTURE
2021.10.20
02 CULVER CITY COMPREHENSIVE PLAN
PHASE 1
PHASE 2
PHASE 3
ELEND
A S
T
COOMB
S A
VE
CUL
VER BL
VD

EXISTING PROJECT SITE AERIAL PHOTO
AREA 3
AREA 2
AREA 1

AUX ARCHITECTURE
2021.10.20
03 CULVER CITY COMPREHENSIVE PLAN
(E) BUILDING AREA
(E) PEDESTRIAN AREA
(E) LANDSCAPE AREA
(E) PARKING AREA
ROW
(E) FIREPLACE

CULVER BLVD

COOMBS AVE

PROPERTY LINE

PROPERTY LINE
ALLEY
(E) BIKE PARKING
PARKING LOT 1
PARKING SPACES PROVIDED: 62
PARKING LOT 2
PARKING SPACES PROVIDED: 58
(E) WENDE MUSEUM GARDEN
(E) COMMUNITY

GARDENS
(E) WENDE MUSEUM
(E) BUILDING GROSS AREA: 12,596 SF
(E) BUILDING USE: MUSEUM
(E) BUILDING HEIGHT: 24'-0"BUILDING TO
REMAIN
(E) OFFICE BUILDING
ADDRESS: 10866 CULVER BLVD. ADDRESS: 10858 CULVER BLVD. ADDRESS: 10808 - 10876 CULVER BLVD. (E) PARKING

ALLEYCL
10' - 0"

MATCHLINE
(E) SIREN

AUXARCHITECTURE

CREATIVE COMMUNITY CENTER

EXISTING SITE PLAN

PROPERTY LINE

PROPERTY LINE
ALLEY
(E) COMMUNITY

GARDENS
ADDRESS: 10866 CULVER BLVD.
(E) BUILDING AREA
(E) PEDESTRIAN AREA
(E) LANDSCAPE AREA
(E) PARKING AREA
ROW

ELENDA ST

MATCHLINE
2 STORY BUILDING
PADDLE
TENNIS
COURT
ADDRESS: 10876 CULVER BLVD.

AUXARCHITECTURE

CREATIVE COMMUNITY CENTER

EXISTING SITE PLAN

PROPERTY LINE

PROPERTY LINE
ALLEY
(E) COMMUNITY

GARDENS
ADDRESS: 10866 CULVER BLVD.
(E) BUILDING AREA
(E) PEDESTRIAN AREA
(E) LANDSCAPE AREA
(E) PARKING AREA
ROW

ELENDA ST

MATCHLINE
2 STORY BUILDING
PADDLE
TENNIS
COURT
ADDRESS: 10876 CULVER BLVD.

AUXARCHITECTURE

CREATIVE COMMUNITY CENTER

EXISTING SITE PLAN
EXISTING PROJECT SITE PLAN: LOTS 11 - 30

EXISTING PROJECT SITE PLAN
PHASE 2- AREA 2
PHASE 1- AREA 1
PHASE 3- AREA 3

EXISTING BUILDING

EXISTING BUILDING EXISTING COMERCIAL

TRASH ENCLOSURE

AUX ARCHITECTURE
2021.10.20
04 CULVER CITY COMPREHENSIVE PLAN

PROPERTY LINE

PROPERTY LINE
ALLEY
(E) COMMUNITY

GARDENS
ADDRESS: 10866 CULVER BLVD.
(E) BUILDING AREA
(E) PEDESTRIAN AREA
(E) LANDSCAPE AREA
(E) PARKING AREA
ROW

ELENDA ST

MATCHLINE
2 STORY BUILDING
PADDLE
TENNIS
COURT
ADDRESS: 10876 CULVER BLVD.

AUXARCHITECTURE

CREATIVE COMMUNITY CENTER

EXISTING SITE PLAN

PROPERTY LINE

PROPERTY LINE
ALLEY
(E) COMMUNITY

GARDENS
ADDRESS: 10866 CULVER BLVD.
(E) BUILDING AREA
(E) PEDESTRIAN AREA
(E) LANDSCAPE AREA
(E) PARKING AREA
ROW

ELENDA ST

MATCHLINE
2 STORY BUILDING
PADDLE
TENNIS
COURT
ADDRESS: 10876 CULVER BLVD.

AUXARCHITECTURE

CREATIVE COMMUNITY CENTER

EXISTING SITE PLAN

EXISTING PROJECT SITE PLAN
EXISTING BUS STOP, CULVER BLVD & ELENDA ST:

IMPROVEMENTS PER CULVER CITY BUS STOP STANDARDS
TO BE PROVIDED AT A LATER TIME.

PHASE 2- AREA 2
PHASE 1- AREA 1
PHASE 3- AREA 3
EXISTING PROJECT SITE PLAN: LOTS 1 - 10

AUX ARCHITECTURE
2021.10.20
05 CULVER CITY COMPREHENSIVE PLAN
ALLEY
CULVER BLVD.

COOMBS AVE.

EXISTING BUILDING

EXISTING A-FRAME

EXISTING GARDEN

EXISTING PARKING

THE WENDE MUSEUM

EXISTING PROJECT SITE AXONOMETRIC

COMMUNITY GARDEN
PHASE 2- AREA 2
PHASE 1- AREA 1
PHASE 3- AREA 3

EXISTING SIREN

EXISTING COMMERCIAL

TRASH ENCLOSURE

AUX ARCHITECTURE
2021.10.20
06 CULVER CITY COMPREHENSIVE PLAN

THE LAND REFERRED IS SITUATED IN THE STATE OF CALIFORNIA, COUNTY OF LOS ANGELES, AND IS DESCRIBED AS FOLLOWS: LOT 9-30 OF TRACT NO. 9974 AS PER MAP RECORDED IN BOOK 139 PAGES 1-2 OF MAPS, IN THE OFFICE OF THE COUNTY RECORDER OF SAID COUNTY. THE TOTAL LOT AREA IS 49,571.25 SQUARE FEET.

PLAN PHASES
PHASE 1 - AREA 1 (LOTS 14-30) : 38,305 SQ. FT.

PHASE 2 - AREA 2 (LOTS 11-13) : 6,760 SQ. FT.

PHASE 3 - AREA 3 (LOTS 9-10) : 4,507 SQ. FT.

TOTAL: 49,572 SQ. FT.

PHASE ONE - WENDE MUSEUM
LOT AREA (14-30) : 38,305 SQ. FT.

EXISTING BUILDING AREA: 14,023 SQ. FT. (INCLUDING 950 SQ. FT. MEZZANINE) EXISTING PROJECT SITE COVERAGE:
13,073 SQ. FT. (GROSS)

PHASE TWO - CREATIVE COMMUNITY CENTER
LOT AREA (11-13): 6,760 SQ. FT.

EXISTING BUILDING AREA
A-FRAME: 1,920 SQ. FT.

OFFICES: 2,200 SQ, FT, (TO BE DEMOLISHED)
TOTAL AREA: 4,120 SQ. FT.

EXISTING PROJECT SITE COVERAGE:
3,121 SQ. FT. (GROSS)

PROPOSED BUILDING GROSS FLOOR AREA
A-FRAME: 1,920 SQ. FT.

NEW CONSTRUCTION 5,102 SQ. FT.

GROSS FLOOR AREA: 7,022 SQ. FT.

PROPOSED PROJECT SITE COVERAGE:
6,102 SQ. FT. (GROSS)
PHASE THREE - COMMUNITY GARDEN + AFFORDABLE HOUSING
LOT AREA (9-10): 4,507 SQ. FT.

EXISTING BUILDING AREA: 0 SQ. FT.

EXISTING GARDEN SPACE: 4,507 SQ. FT.

EXISTING SITE COVERAGE: 0 SQ. FT.

PROPOSED BUILDING AREA
HOUSING: 1,950 SQ. FT. (UP TO 325 SQ. FT. PER UNIT)
PROPOSED HOUSING GARDEN: 1,780 SQ. FT.

PROPOSED SITE COVERAGE: 2,774 SQ. FT. (GROSS)
PROPOSED GARDEN SPACE: 2,731 SQ. FT.

TOTAL PROPOSED GARDEN: 4,511 SQ. FT.

COMPREHENSIVE PLAN PHASES

CAMPUS SITE PLAN
PHASE 1
PHASE 3
PHASE 2

EXISTING PARKING EXISTING PARKING
ALLEY

CULVER BOULEVARD

COOMBS AVENUE
LOTS 14 - 30
LOTS 11 - 13
LOTS 09 - 10
AREA 3 AREA 2 AREA 1
PHASE 2- AREA 2
PHASE 1- AREA 1
PHASE 3- AREA 3

AUX ARCHITECTURE
2021.10.20
07 CULVER CITY COMPREHENSIVE PLAN
PHASE ONE - WENDE MUSEUMii
Phase One Objectives
• Establish permanent facilities for the Wende Museum and Archive of the Cold War at the former National Guard Armory.
• Activate an underused civic space by establishing a new museum, art historical archive, and center for community engagement.
• Complement and enhance Culver City’s existing local art and cultural resources. • Adaptively reuse an existing City structure and surrounding property, restoring them in an environmentally responsible manner.

The Museum occupies an existing one-story, 13,073 square foot Armory building located at 10808 Culver Boulevard. Improvements to the building included an internal addition of 950 square feet of mezzanine/storage area. The Museum project also included improvements to the building’s exterior, including the use of smooth stucco and sandblasted concrete as part of the new building façade and fasciae around the building. A surface parking and storage area was repurposed with a sculptural garden, highlighted by new landscaping, decorative pavers and artifact displays. The Museum provides an eco-friendly restoration of the building and its surrounding property as an adaptive re-use that has greatly enhanced the neighborhood.

The Museum provides for programs, separate offices and research workspaces, collections receiving and processing, artifact storage, and increased exhibition space for temporary and permanent exhibitions and public programming to fulfill the Museum’s mission . Storage was improved by establishing microclimates for different collection formats and by transitioning the collection into a combination of visitor-accessible open storage and efficient compact storage. In addition, controlled lighting and increased security follow museum best practices for its rare collection. The Museum operates film screenings, health and wellness classes, gatherings, music and dance performances, museum installations, family day activities, art lessons, exercise and aerobics, gardening and landscaping, demonstrations, readings, lectures, presentations, breakfasts, lunches and dinners, coffee and tea, convening, conferences, and other activities related to a cultural center in the outdoor garden that was developed as part of Phase 1.

AUX ARCHITECTURE
2021.10.20
08 CULVER CITY COMPREHENSIVE PLAN
□ □ □ □□
□□□ □□□
□□□□
□ □ □ □□
□□□
□□□□
□□□□
□ □□□
□ □□
□□□□ □□□□
□□
□□ □□
□□
□□□□
□ □ □ □□
□
□ □ □ □ □ □□ □
□ □ □ □□
□ □
□ □
□ □
□ □□ □
□□ □□□ □
□□□
□
□□□□□
□□ □
□□□□□
□□ □
□
□□□
□□□□□
□□
□□
□□
□□□□
□□□□ □ □
□□
□□
□□
□□
□□
□□
□ □□ □
□□□□
□□
□□
□ □
□ □□ □
□□□ □□ □
□ □□ □
□□□□□□□□
□□□□
□ □ □
□□□□□
□□□□
□□ □□ □
□□□□
□ □□ □
□ □
□ □ □ □
□ □□ □
□□□ □□□□□□□□□□□□
□□□□□□□□□□□□□□□□□□□□□□□□□
□□□□□□□□□□□□□□□□□□
1 2
3 4
5 6 7
8 EXISTING WENDE MUSEUM PHOTOS
CORNER OF COOMBS AND CULVER | 1 ENTRY FROM COOMBS | 7
CORNER OF COOMBS AND CULVER | 4INTERIOR GARDEN WEST | 2 INTERIOR GARDEN NORTH | 8 GARDEN WALK WAY | 5INTERIOR GARDEN EAST | 3
INTERIOR GARDEN AFRAME | 6
ADDRESS:
10866 CULVER BLVD.

ADDRESS:
10858 CULVER BLVD.

ADDRESS:
10808 - 10876 CULVER BLVD.

AUX ARCHITECTURE
2021.10.20
09 CULVER CITY COMPREHENSIVE PLAN
THE WENDE MUSEUM ARMORY | CULVER CITY, CALIFORNIA
this is a copyrighted document containing copyrighted content and may not be reproduced in part or whole without written permission by PARAVANT Inc. | 2012 © PARAVANT ARCHITECTS | 6017 WASHINGTON BLVD. | CULVER CITY, CA 90232 | WWW.PARAVANTARCHITECTS.COM | 310 795 7132 | 310 880 7307 FLOOR PLAN 2015

OFFICE WC WC

VAULT VAULT VAULT VAULT VAULT
WC WC
IT
BREAK
OFFICE

OFFICEFOYER

SEATING

EXHIBITION

MUSEUM DISPLAY

MUSEUM DISPLAY

BOOK SHELF

BOOK SHELF

COLONADE

SCULPTURAL GRADEN

ENTRANCE
14 EXISTING WENDE FLOOR PLANS

EXISTING FIRST FLOOR PLAN, PROVIDED BY WENDE MUSEUM
231’ 3”
80’ 6.5”

AUX ARCHITECTURE
2021.10.20
10 CULVER CITY COMPREHENSIVE PLAN
THE WENDE MUSEUM ARMORY | CULVER CITY, CALIFORNIA
this is a copyrighted document containing copyrighted content and may not be reproduced in part or whole without written permission by PARAVANT Inc. | 2012 © PARAVANT ARCHITECTS | 6017 WASHINGTON BLVD. | CULVER CITY, CA 90232 | WWW.PARAVANTARCHITECTS.COM | 310 795 7132 | 310 880 7307 SERVICE MEZZANINE 2015

SERVICE/

STORAGE

MEZZANINE

OPEN TO BELOW

ROOF BELOW
15 EXISTING WENDE FLOOR PLANS

EXISTING MEZZANINE FLOOR PLAN, PROVIDED BY WENDE MUSEUM 231’ 3”
80’ 6.5”

AUX ARCHITECTURE
2021.10.20
11 CULVER CITY COMPREHENSIVE PLAN
THE WENDE MUSEUM ARMORY | CULVER CITY, CALIFORNIA
this is a copyrighted document containing copyrighted content and may not be reproduced in part or whole without written permission by PARAVANT Inc. | 2012 © ROOF PLAN 2015

LOWER ROOF
ROOF

SOLAR TUBES

PHOTOVOLTAIC PANEL
16 PARAVANT ARCHITECTS | 6017 WASHINGTON BLVD. | CULVER CITY, CA 90232 | WWW.PARAVANTARCHITECTS.COM | 310 795 7132 | 310 880 7307

EXISTING WENDE ROOF PLAN

EXISTING ROOF PLAN, PROVIDED BY WENDE MUSEUM
231’ 3”
80’ 6.5”

AUX ARCHITECTURE
2021.10.20
12 CULVER CITY COMPREHENSIVE PLAN
THE WENDE MUSEUM ARMORY | CULVER CITY, CALIFORNIA
this is a copyrighted document containing copyrighted content and may not be reproduced in part or whole without written permission by PARAVANT Inc. | 2012 © PARAVANT ARCHITECTS | 6017 WASHINGTON BLVD. | CULVER CITY, CA 90232 | WWW.PARAVANTARCHITECTS.COM | 310 795 7132 | 310 880 7307 ELEVATION 2015

ELEVATION WEST

ELEVATION EAST

WHITE EXTERIOR PAINT, FLAT
EXISTING EXPOSED CONCRETE | SANDBLASTED, SEALED

WITH ANTI-GRAFFITI COATING

WOOD/FLASHING PAINTED

SMOOTH TROWEL STUCCO, TO MATCH

THE WENDE MUSEUM LOGO COLOR

GLAZING, ANODIZED ALUMINUM FRAME
18 THE WENDE MUSEUM ARMORY | CULVER CITY, CALIFORNIA
this is a copyrighted document containing copyrighted content and may not be reproduced in part or whole without written permission by PARAVANT Inc. | 2012 © PARAVANT ARCHITECTS | 6017 WASHINGTON BLVD. | CULVER CITY, CA 90232 | WWW.PARAVANTARCHITECTS.COM | 310 795 7132 | 310 880 7307 ELEVATION 2015

ELEVATION SOUTH

ELEVATION NORTH

WHITE EXTERIOR PAINT, FLAT
EXISTING EXPOSED CONCRETE | SANDBLASTED, SEALED

WITH ANTI-GRAFFITI COATING

WOOD/FLASHING PAINTED

SMOOTH TROWEL STUCCO, TO MATCH

THE WENDE MUSEUM LOGO COLOR

GLAZING IN ANODIZED ALUMINUM FRAME
17 EXISTING WENDE ELEVATIONS

EXISTING EAST ELEVATION PROVIDED BY WENDE MUSEUM

EXISTING WEST ELEVATION PROVIDED BY WENDE MUSEUM

EXISTING NORTH ELEVATION PROVIDED BY WENDE MUSEUM

EXISTING SOUTH ELEVATION PROVIDED BY WENDE MUSEUM

AUX ARCHITECTURE
2021.10.20
13 CULVER CITY COMPREHENSIVE PLAN
PHASE TWO - AREA 2: CREATIVE COMMUNITY CENTER
Phase Two Objectives
• Strengthen the identity and impact of the “Culver City Cultural Corridor” • Expand the Wende Museum’s capacity and ability to serve as a community resource by creating additional, more functional facilities for community engagement activities. • Maintain and establish operational, meeting, and educational space for community partners including the United States Veterans’ Artist Alliance, Culver City Unified School District, the Mayme A. Clayton Library and Museum, and Upward Bound House.
• Expand access to Wende Museum resources for scholars, artists, students, journalists, artists, authors, filmmakers, and the general public.
• Adaptively reuse an existing City structure and surrounding property, renovating the AmVets Building in an environmentally responsible manner.

The Expansion Area is comprised of 11,266.25 square feet (Area 2 and Area 3), and is currently developed with a two-story, 4,120 square feet, building at 10858 Culver Boulevard and with a community garden. The existing two- story segment of the building was originally constructed as a single family residence at 3829 Delmas Terrace in approximately 1924. The building was moved to its current site in 1950 for use as Veterans of Foreign Wars (VFW) Culver Palms Post No. 1476. The VFW added the one-story A-Frame structure, 1,920 square feet, to the rear of the two-story segment at that same time. The VFW occupied the building for 45 years, using it not only for its own membership, but also for other civic and veterans groups such as the VFW Post 1476 Ladies Auxiliary, the Knights of Columbus, and American Veterans of World War II, as well as local theater and performance groups.

In 1996, AmVets Post No. 2 took over occupancy of 10858 Culver Boulevard, using the two-story portion of the building for offices and the one-story portion as a multi-purpose assembly space. AmVets remained in the City-owned building until November 5, 2018, vacating the building at that time due to disrepair and structural deficiencies.

Pursuant to the Historic Resource Evaluation prepared by Architectural Resources Group for the City of Culver City in 2019, the building at 10858 Culver Boulevard is eligible for listing as a City of Culver City Cultural Resource, at the Recognized level. This level of designation indicates the building is of architectural, historical, or cultural interest per the Culver City Municipal Code and does not carry protections or requirements for regulation, as it is an honorific designation.

Phase Two of the Comprehensive Plan proposes the demolition of the 2,200 square feet, two-story segment of the building and renovation of the remaining existing 1,920 square foot single-story segment of the building in Area 2.

The renovated portion will be combined with a proposed three-story, 5,102 square foot addition, for a total of 7,022 square feet, to be used as a Creative Community Center, introducing a new gathering place at a key location within the City.

The resulting building will be utilized as a multi-use space, incorporating a multi-purpose room for live performance and literary events, classrooms for dance and art instruction, a demonstration garden, skill-sharing and resource exchange areas, meeting rooms, tutorial offices, dedicated places for hands-on learning opportunities, and exhibition spaces. In addition, it will contain ancillary spaces and uses related to the operation of the facility, including offices, meeting rooms, and a small kitchen facility for on-site catering, as listed below. The Wende will operate the existing Museum and the Creative Community Center together, coordinating programming and use to ensure that the number of visitors on a daily basis at the site will remain consistent with current levels.

Street level landscaping and sculpture will be included in the Project Site’s redevelopment, as well as a rooftop garden. The existing garden at the Museum will be expanded to establish continuity between the new development and the existing Museum and sculpture garden. The Wende will continue to operate film screenings, health and wellness classes, gatherings, music and dance performances, museum installations, family day activities, art lessons, exercise and aerobics, gardening and landscaping, demonstrations, readings, lectures, presentations, breakfasts, lunches and dinners, coffee and tea, convening, conferences, and other activities related to a cultural center in the garden.

AUX ARCHITECTURE
2021.10.20
14 CULVER CITY COMPREHENSIVE PLAN
Phase Two Objectives
The Wende will work closely with partner organizations from the local community, including veterans groups, cultural and non-profit organizations and the Culver City Unified School District (CCUSD) in its operations of the Creative Community Center. For example:
• The Site’s historic affiliation with the veteran community will continue as the United States Veterans’ Artist Alliance will be given access to the renovated, state-of-the-art venue for meetings and performances as well as access to critical services, all free-of-charge.
• Upward Bound House, which works to eliminate homelessness among families with children, will have access to cultural and educational programming offered by the Wende and other partner organizations, as well as use of tutorial and meeting spaces, and special access to the rooftop demonstration garden. • The Mayme A. Clayton Library and Museum (MCLM) in Culver City, an archive of African American culture including documents, books, musical records, and ephemera, will have use of the Creative Community Center for programs, projects, lectures, and special events, in perpetuity. Establishment of the Creative Community Center will enable the Museum to provide permanent exhibition space to MCLM. • The Creative Community Center includes dedicated project-based learning spaces for CCUSD’s elementary, middle, and high schools. The Creative Community Center will be equipped for CCUSD programming, including:
face-to-face oral histories, printmaking workshops, and conflict resolution courses; establishment of a capstone project program on “then-and-now” themes of political movements, civil rights, and social justice. The Creative Community Center will be equipped to support dance, music, and performing arts (in conjunction with Culver City High School’s Academy of Visual and Performing Arts) by providing a flexible assembly space.

PHASE TWO - AREA 2: CREATIVE COMMUNITY CENTER

AUX ARCHITECTURE
2021.10.20
15 CULVER CITY COMPREHENSIVE PLAN
□ □ □ □□
□□□ □□□
□□□□
□ □ □ □□
□□□
□□□□
□□□□
□ □□□
□ □□
□□□□ □□□□
□□
□□ □□
□□
□□□□
□ □ □ □□
□
□ □ □ □ □ □□ □
□ □ □ □□
□ □
□ □
□ □
□ □□ □
□□ □□□ □
□□□
□
□□□□□
□□ □
□□□□□
□□ □
□
□□□
□□□□□
□□
□□
□□
□□□□
□□□□ □ □
□□
□□
□□
□□
□□
□□
□ □□ □
□□□□
□□
□□
□ □
□ □□ □
□□□ □□ □
□ □□ □
□□□□□□□□
□□□□
□ □ □
□□□□□
□□□□
□□ □□ □
□□□□
□ □□ □
□ □
□ □ □ □
□ □□ □
□□□ □□□□□□□□□□□□
□□□□□□□□□□□□□□□□□□□□□□□□□
□□□□□□□□□□□□□□□□□□
1 2
3 4
567
8 EXISTING PHASE 2 SITE PHOTOS
ALLEY AFRAME WEST | 1
EXISTING ENTRY | 2 ALLEY AFRAME EAST | 4
AFRAME SIDE | 3 AFRAME INTERIOR | 7AFRAME INTERIOR | 7AFRAME INTERIOR | 5 AFRAME SIDE | 8AFRAME INTERIOR | 6
ADDRESS:
10866 CULVER BLVD.

ADDRESS:
10858 CULVER BLVD.

ADDRESS:
10808 - 10876 CULVER BLVD.

AUX ARCHITECTURE
2021.10.20
16 CULVER CITY COMPREHENSIVE PLAN
D D
EE
6 6
2 2
HALL
1 EXISTING TWO

STORY TO BE

DEMOLISHED
UP 15"
59' - 1"
31' - 3"

PROPERTY LINEPROPERTY LINE

PROPERTY LINEPROPERTY LINE
LOT
75' - 0"
ALLEY
15' - 2"

EXISTING A-FRAME
60' - 6"

EXISTING A-FRAME
32' - 1" 48' - 2"

EXISTING SIREN TO

BE RELOCATED
CL
9' - 11"
8"
6' - 9"30' - 10"
12' - 8" 22' - 4"

TO REMAIN

TO DEMOLISH

EXISTING & DEMO FLOOR PLANS

EXISTING

A-FRAME

EXISTING

BUILDING

AUX ARCHITECTURE
2021.10.20
17 CULVER CITY COMPREHENSIVE PLAN
EXISTING T.O. ROOF
27'-7"
EXISTING T.O. ROOF
27'-7"
DE

92.51 SITE LOWEST POINT

92.51 92.51 SITE LOWEST POINT

92.51 1ST FLOOR

95.81 1ST FLOOR

95.81 9' - 11"

EXISTING A-FRAME
32' - 1" 48' - 2"

PROPERTY LINE

PROPERTY LINE

EXISTING TWO STORY

BUILDING TO BE

DEMOLISHED

EXISTING SIREN TO BE

RELOCATED
7' - 2"20' - 5"3' - 4"
EXISTING T.O. ROOF
27'-7"
EXISTING T.O. ROOF
27'-7"
6 92.51 SITE LOWEST POINT

92.51 92.51 SITE LOWEST POINT

92.51 2
1ST FLOOR

95.81 1ST FLOOR

95.81 PROPERTY LINE

PROPERTY LINE

EXISTING TWO STORY

BUILDING TO BE

DEMOLISHED

EXISTING A-FRAME
60' - 6"

EXISTING SIREN TO BE

RELOCATED
8"
15' - 2"
3' - 4" 20' - 5" 7' - 2"
EXISTING T.O. ROOF
27'-7"
EXISTING T.O. ROOF
27'-7"
6 92.51 SITE LOWEST POINT

92.51 92.51 SITE LOWEST POINT

92.51 2
1ST FLOOR

95.81 1ST FLOOR

95.81 EXISTING A-FRAME
60' - 6"

PROPERTY LINE

PROPERTY LINE
8"
15'-2"
27' - 7"3' - 4"
EXISTING T.O. ROOF
27'-7"
EXISTING T.O. ROOF
27'-7"
D E

92.51 SITE LOWEST POINT

92.51 92.51 SITE LOWEST POINT

92.51 1ST FLOOR

95.81 1ST FLOOR

95.81 PROPERTY LINE

PROPERTY LINE

EXISTING TWO STORY

BUILDING TO BE

DEMOLISHED

EXISTING A-FRAME
32' - 1" 9'-11"48'-2"
7' - 2"20' - 5"3' - 4"

TO REMAIN

TO DEMOLISH

EAST ELEVATION

SOUTH ELEVATION

WEST ELEVATION

NORTH ELEVATION

EXISTING & DEMO ELEVATIONS

ASPHALT

SHINGLES

ASPHALT

SHINGLES
SMOOTH

STUCCO FINISH
SMOOTH

STUCCO FINISH

ASPHALT SHINGLES

ASPHALT

SHINGLES
SMOOTH

STUCCO FINISH

EXISTING

BUILDING

EXISTING A-FRAME

BUILDING

EXISTING A-FRAME

BUILDING

EXISTING A-FRAME

BUILDING
SMOOTH

STUCCO FINISH

EXISTING A-FRAME

BUILDING

EXISTING

BUILDING

EXISTING

BUILDING

AUX ARCHITECTURE
2021.10.20
18 CULVER CITY COMPREHENSIVE PLAN
ALLEY
CULVER BLVD.

COOMBS AVE.

CREATIVE COMMUNITY CENTER

EXISTING A-FRAME

EXISTING GARDEN

EXISTING PARKING

THE WENDE MUSEUM
PHASE TWO - AREA 2: PROPOSED PROJECT SITE AXONOMETRIC

COMMUNITY GARDEN

EXISTING COMMERCIAL

TRASH ENCLOSURE

PROPOSED SIREN

RELOCATION
PHASE 2- AREA 2
PHASE 1- AREA 1
PHASE 3- AREA 3

AUX ARCHITECTURE
2021.10.20
19 CULVER CITY COMPREHENSIVE PLAN
(E) FIREPLACE

CULVER BLVD
COO

MBS AVE

PROPERTY LINE

PROPERTY LINE
CL
ALLEY
ALLEY
(E) BIKE PARKING
PARKING LOT 1
PARKING SPACES PROVIDED: 62
PARKING LOT 2
PARKING SPACES PROVIDED: 58
(E) WENDE MUSEUM GARDEN

PROPOSED CREATIVE

COMMUNITY CENTER
(E) WENDE MUSEUM
(E) BUILDING GROSS AREA: 12,596 SF
(E) BUILDING USE: MUSEUM
(E) BUILDING HEIGHT: 24'-0"
MECH
UNIT
MECH
UNIT
PHASE 2 TRASH

ENCLOSURE

RELOCATED
SIREN
94' - 2" (BUILDING)
90' - 2" (LOT)
75' - 0" (LOT)
PHASE 2

CREATIVE COMMUNITY CENTER
PHASE 1

THE WENDE MUSEUM
74' - 9" (BUILDING)
4' - 10" 2' - 11"
6' - 0"
2' - 0"

NEW FENCE NEW FENCE TO MATCH EXISTING EXISTING FENCE
LOT 9 LOT 10
1'-3" 8'-0" 14'-9" 7'-8"
14'-0"
10'-0"
24'-0"
11'-4" TRASH AREA
NOTES:

1. THE PROPOSED NEW BINS

SHALL SERVICE THE WENDE

MUSEUM AND THE CREATIVE
COMMUNITY CENTER.

2. PROPERTY MANAGEMENT

SHALL BE RESPONSIBLE FOR

PLACING THE ORGANIC WASTE

CART OUTSIDE THE ENCLOSURE

AND THEN BACK INSIDE ON THE

TRASH COLLECTION DAY
(N) 24" x 32"

ORGANIC

WASTE BIN
(N) 3-YARD,

4.5' x 7'

REFUSE BIN
(N) 3-YARD,

4.5' x 7'

RECYCLE BIN
(E) MAIN

ELECTRICAL

SWITCHBOARD
SCALE: N.T.S.

AMENDMENT 1 -

PHASE TWO -
AREA 2 - CREATIVE COMMUNITY CENTER
SCALE: N.T.S.

PHASE ONE -
AREA 1 - THE WENDE MUSEUM
PHASE TWO - AREA 2: PROPOSED PROJECT SITE PLAN
AMENDMENT 1 -

PHASE THREE -
AREA 3
(E) COMMUNITY
GARDEN

AUX ARCHITECTURE
2021.10.08
19 CULVER CITY COMPREHENSIVE PLAN
Approved Trash Enclosure
10/15/2021, EPO - MN
PHASE TWO - AREA 2: PROPOSED PROJECT SITE PLAN

AUX ARCHITECTURE
2021.10.20
20 CULVER CITY COMPREHENSIVE PLAN
AD
AD
DN
DNUP

COMMUNITY OPEN SPACE
SITE STAIR 1
STAIR 2
DN
DN

PROPERTY LINE
(E) STATUE

EXIT GATE
ALLEY
(E) WENDE

MUSEUM GARDEN
(E) POWER POLE
(E) PARKING
(E) PARKING
(E) GARDEN FOUNTAIN

PROPERTY LINEPROPERTY LINE

PROPERTY LINE
(E) FENCE
(E) FENCE
CL

ACCESS GATE
(E) RAMP
(E) RAMP
(E) GUARD
HOUSE
(E) SITE
STAIR
(E) FIRE PIT
(E) BAMBOO HEDGE

NEW CONSTRUCTION
EXISTING 1,920 SF A-FRAME BUILDING

GARDEN ACCESS

SLOPED WALKWAY

SIDE-YARD

ENCROACHMENT

AIR-SPACE ENCROACHMENT ABOVE
2'-0" REAR-YARD SETBACK
0'-0" SIDE-YARD SETBACK
0'-0" SIDE-YARD SETBACK
0'-0" FRONT-YARD SETBACK
(E) POWER POLE
SLOPED WALKWAY 2.0%
SLOPED WALKWAY 2.0% MAX.NEW

TEMPORARY
FENCE HEIGHT:
6' MIN - 8' MAX
MATERIAL:

CHAINLINK

LINE OF STRUCTURE
ABOVE
MECH. ENCLOSURE

EXISTING SIREN

RELOCATED

BACKFLOW PREVENTION

DEVICES

FDC CONNECTION

GAS METER

NEW FENCE
HEIGHT: MATCH EXISTING
MATERIAL: MATCH EXISTING
(BUILDING)
94' - 2"
90' - 2" (LOT)
75' - 0" (LOT)
4' - 10"
2' - 11"
2' - 0"
6' - 0"

AIR-SPACE

ENCROACHMENT
ABOVE
(BUILDING)
74' - 9" NOTE(S):

1. STAIR 2 - REQUEST FOR MODIFICATION TO ALLOW EXIT STAIRWAY WITHIN 10 FEET FROM THE PROPERTY LINE. SPRINKLERS WILL
PROVIDED THROUGHOUT TO PROVIDE EQUIVALENT PROTECTION.

SHORT-TERM BIKE PARKING - 8 PARKING

SPACES REQUIRED
10' - 0"

LONG-TERM

BIKE PARKING,
4 SPACES

REQUIRED
PHASE TWO - AREA 2: ENLARGED PROPOSED PROJECT SITE PLAN SCALE: N.T.S.
(E) COMMUNITY GARDEN
32”

SIDE-YARD

ENCROACHMENT

AUX ARCHITECTURE
2021.10.20
21 CULVER CITY COMPREHENSIVE PLAN
AD
AD
DN
DNUP
(E) STATUE

VESTIBULE
ADA

SEATING
(4 SEATS)
(88 SEATS TOTAL)
(E) WENDE MUSEUM
GARDEN
(E) PARKING

ELEVATOR
(E) GARDEN FOUNTAIN

ENTRANCE GATE
(E) FENCE
(E) FENCE

PROPERTY LINE

PROPERTY LINE
SITE STAIR 1
STAIR 2

CORRIDOR
STAIR 1
(E) STAIR
DN
DN
(E) POWER POLE(E) WALK ADJACENT TO PARKING WALK

NEW FENCE

LINE OF

STRUCTURE
ABOVE

PROPERTY LINE

PROPERTY LINE
(E) FIRE PIT
(E) BAMBOO HEDGE

TELESCOPIC SEATING
(59 SEATS)

EXIT GATE
2'-0" REAR-YARD SETBACK
0'-0" SIDE-YARD SETBACK
0'-0" SIDE-YARD SETBACK
0'-0" FRONT-YARD SETBACK

SIDE-YARD

ENCROACHMENT
SLOPED WALKWAY 2.0%
SLOPED WALKWAY 2.0% MAX.

MECH. ENCLOSURE

SHORT-TERM BICYCLE

EXISTING SIREN

RELOCATED

BACKFLOW

PREVENTION DEVICE

FDC CONNECTION

AIR-SPACE

ENCROACHMENT
6'-0".

ELECTRICAL
PANELS

GAS METER

NEW FENCE TO

MATCH EXISTING
5' - 0"5' - 1"5' - 10"29' - 11"3' - 3"5' - 8"1' - 9"

BIKE RACK
56' - 6"

SLOPED WALKWAY
2' - 11"

AIR-SPACE

ENCROACHMENT
ABOVE

AUXARCHITECTURE

CREATIVE COMMUNITY CENTER

GROUND FLOOR PLAN
PHASE TWO - AREA 2: PROPOSED FLOOR PLANS

GROUND FLOOR PLAN
B11- ELEC /UTILITY ROOM
B12- AV ROOM
B14- LONG-TERM BICYCLE PARKING

B BUILDING SUPPORT
L1- LOBBY
L2- WOMEN’S RESTROOM
L3- MEN’S RESTROOM
LOBBYL
T1- MULTI-PURPOSE ROOM

MULTI-PURPOSET
BH1- SINGLE-USER RESTROOM
BH2- BREAKROOM + KITCHENETTE
BH3- EXIT STAIR 1
BH4- UTILITY ROOM

BACK OF HOUSE (BOH)BH
LEGEND
L1
T1
BH2BH3 BH4
B12
BH1
B11
B14
L3 L2
30 31
28 29EXISTING WALL

PROPOSED WALL
32”32”

SIDE-YARD

ENCROACHMENT

AUX ARCHITECTURE
2021.10.20
22 CULVER CITY COMPREHENSIVE PLAN
D D
EE
6 6
2 2
HALL
1 EXISTING TWO

STORY TO BE

DEMOLISHED
UP 15"
59' - 1"
31' - 3"

PROPERTY LINEPROPERTY LINE

PROPERTY LINEPROPERTY LINE
LOT
75' - 0"
ALLEY
15' - 2"

EXISTING A-FRAME
60' - 6"

EXISTING A-FRAME
32' - 1" 48' - 2"

EXISTING SIREN TO

BE RELOCATED
CL
9' - 11"
8"
6' - 9"30' - 10"
12' - 8" 22' - 4"

GROUND FLOOR PLAN

EXISTING FLOOR PLANS

AUX ARCHITECTURE
2021.10.20
23 CULVER CITY COMPREHENSIVE PLAN
UP
UP
DN
AD
DN
34' - 5"
14' - 3"
STAIR 2
STAIR 1

CORRIDOR

ELEVATOR

ROOF BELOW
(AREA FOR MECHANICAL EQUIP.)
20' - 7"

PROPERTY LINE

PROPERTY LINE

GREEN ROOF

LINE OF STRUCTURE
ABOVE

GREEN ROOF
SCREEN

GREEN ROOF
SCREEN

LINE OF STRUCTURE
ABOVE

EXTERIOR STAIR
(E) POWER POLE

PROPERTY LINE

PROPERTY LINE

EXISTING BUILDING

ROOF BELOW
ROOF
SLOPES
DN
ROOF
SLOPES
DN
6' - 0" 8' - 11"
0'-0" SIDE-YARD SETBACK
0'-0" SIDE-YARD SETBACK

SIDE-YARD

ENCROACHMENT
2'-0" REAR-YARD SETBACK
0'-0" FRONT-YARD SETBACK
MECH. ENCLOSURE

EXISTING SIREN

RELOCATED
VARIES
29' - 5" 6' - 6" 9' - 7" 21' - 8"
11' - 7" 6' - 7" 10' - 11" 16' - 1" 3' - 7"
48' - 9"
67' - 1"
2' - 11"

AIR-SPACE

ENCROACHMENT
ABOVE

MECH UNIT

AIR-SPACE

ENCROACHMENT
6' - 0"

AUXARCHITECTURE

CREATIVE COMMUNITY CENTER

SECOND FLOOR PLAN
LEGEND

B BUILDING SUPPORT
B1- EDUCATION / TUTORIAL
B4- CLASSROOM
B8- STORAGE/CUBBIES
B4
B8 B1
PHASE TWO - AREA 2: PROPOSED FLOOR PLANS
2ND FLOOR PLAN
32”

SIDE-YARD

ENCROACHMENT
30 31
28 29

AUX ARCHITECTURE
2021.10.20
24 CULVER CITY COMPREHENSIVE PLAN
D D
EE
6 6
2 2

EXISTING TWO

STORY TO BE

DEMOLISHED

PROPERTY LINE

PROPERTY LINEPROPERTY LINE
ALLEY

EXISTING SIREN TO

BE RELOCATED
CLLOT
75' - 0"
15' - 2"

EXISTING A-FRAME
60' - 6"

EXISTING A-FRAME
32' - 1" 48' - 2"9' - 11"
6' - 9"30' - 5"
12' - 8" 22' - 4"

EXISTING FLOOR PLANS
2ND FLOOR PLAN

AUX ARCHITECTURE
2021.10.20
25 CULVER CITY COMPREHENSIVE PLAN
DN UP
DN
AD
UP
14' - 2"
34' - 5"

ELEVATOR

PROPERTY LINEPROPERTY LINE

PROPERTY LINEPROPERTY LINE

GREEN ROOF
SCREEN

GREEN ROOF

LINE OF

STRUCTURE ABOVE

LINE OF

STRUCTURE ABOVE
SCREEN
ROOF
SLOPES
DN
STAIR 1
STAIR 2

EXTERIOR STAIR

CORRIDOR

EXISTING BUILDING

ROOF BELOW

ROOF BELOW
(E) POWER POLE
20' - 7"
7' - 3"
0'-0" SIDE-YARD SETBACK
0'-0" SIDE-YARD SETBACK

LINE OF STRUCTURE
ABOVE
2'-0" REAR-YARD SETBACK
0'-0" FRONT-YARD SETBACK

LINE OF FLOOR
BELOW

EXISTING SIREN

RELOCATED
19' - 6" 7' - 10" 13' - 0" 8' - 6"
61' - 9"
21' - 1"10' - 2"5' - 10"
VARIES
24' - 8"
48' - 9"
ROOF
SLOPES
DN
ROOF
SLOPES
DN

MECH UNIT
6' - 0"
2' - 11"

SIDE-YARD

ENCROACHMENT

AIR-SPACE

ENCROACHMENT

AUXARCHITECTURE

CREATIVE COMMUNITY CENTER

THIRD FLOOR PLAN
LEGEND

B BUILDING SUPPORT
B2- OFFICE
B5- FLEX SPACE
B6- SINGLE-USER RESTROOM
B9- STORAGE
B5
B6
B9 B2
PHASE TWO - AREA 2: PROPOSED FLOOR PLANS
3RD FLOOR PLAN
32”
30 31
28 29

AUX ARCHITECTURE
2021.10.20
26 CULVER CITY COMPREHENSIVE PLAN
DN
AD
DN
DN
STAIR 2
ROOF
SLOPES
DN
ROOF
SLOPES
DN

ELEVATOR

PROPERTY LINE

PROPERTY LINE

GREEN ROOF

GREEN ROOF

LINE OF FLOOR
BELOW

LINE OF ROOF
BELOW
ROOF
SLOPES
DN

LINE OF FLOOR
BELOW
(E) POWER POLE

PROPERTY LINE

PROPERTY LINE

EXISTING BUILDING

ROOF BELOW

ROOF GARDEN CABANA
15% OF ROOF AREA PER
CCMC SEC.17.300.025 (C)(4)

REFER TO LANDSCAPE DWG
2'-0" REAR-YARD SETBACK
0'-0" SIDE-YARD SETBACK
0'-0" SIDE-YARD SETBACK
0'-0" FRONT-YARD SETBACK

ROOF BELOW

SIDE-YARD

ENCROACHMENT

MECH EQUIPMENT

EXISTING SIREN

RELOCATED
17' - 4" 6' - 5" 10' - 2" 26' - 3"
5' - 1" 6' - 1" 37' - 2"
60' - 2"
48' - 3"
6' - 0"
2' - 11"

AIR-SPACE

ENCROACHMENT
1' - 10"

SOLAR PANELS
AS REQ

AUXARCHITECTURE

CREATIVE COMMUNITY CENTER

ROOF PLAN
SLOPE
1/4" : FT

ROOF ACCESS
HATCH

MECH UNIT
15' - 9"
VARIES
9' - 11"
11' - 9"

B BUILDING SUPPORT
B10-ROOF DECK, REFER TO ROOF LAYOUT ON

LANDSCAPE DRAWINGS
B14- ELEV. MACHINE ROOM
LEGEND
B10
B14

ELEVATOR ROOF PLAN
PHASE TWO - AREA 2: PROPOSED ROOF PLAN

ROOF PLAN
32”
21 30
31 28
29 AUX ARCHITECTURE
2021.10.20
27 CULVER CITY COMPREHENSIVE PLAN
2ND FLOOR
11'-0"
3RD FLOOR
22'-10"
ROOF
34'-6"
004 - SCREEN
003 - SCREEN
FRAME
002 - BOARD

FORM CONCRETE

NEW FENCE/ GATE

TO MATCH

EXISTING
005 - METAL

BALUSTRADE
001 - SMOOTH

STUCCO FINISH

92.51 SITE LOWEST POINT

92.51 43'-0" MAX. HEIGHT PER SEC. 17.220.020(A) TABLE 2-6 39' - 4"
19'-6" MAX. PER 17.300.025(C)(2)(b)
15' - 2"
54' - 5"
MAX. HEIGHT PER CCMC SEC.

17.300.025 (C)(4)

REFER TO LANDSCAPE DWG

SIDE-YARD

ENCROACHMENT
1ST FLOOR

95.81 ROOF GARDEN LEVEL
36'-0"

EXISTING SIREN -

RELOCATED

PROPERTY LINE

PROPERTY LINE
11'-0" 11'-10" 11'-8" 1'-6"

ROOF GARDEN TRELLIS
9'-0" 6'-1 1/2"
0'-0" SIDE-YARD

SETBACK
0'-0" SIDE-YARD

SETBACK

SIDE YARD ENCROACHMENT
32".
3' - 4"
BLDG

ADDRESS

NEW FENCE
HEIGHT: MATCH EXISTING
MATERIAL: MATCH EXISTING

AUXARCHITECTURE

CREATIVE COMMUNITY CENTER

ELEVATIONS
EXISTING T.O. ROOF
27'-7"
EXISTING T.O. ROOF
27'-7"
6 92.51 SITE LOWEST POINT

92.51 92.51 SITE LOWEST POINT

92.51 2
1ST FLOOR

95.81 1ST FLOOR

95.81 PROPERTY LINE

PROPERTY LINE

EXISTING A-FRAME
60' - 6"

EXISTING SIREN TO BE

RELOCATED
8"
15' - 2"
3' - 4" 20' - 5" 7' - 2"

NORTH ELEVATION

EXISTING PROPOSED
PHASE TWO - AREA 2: PROPOSED ELEVATIONS

AUX ARCHITECTURE
2021.10.20
28 CULVER CITY COMPREHENSIVE PLAN
2ND FLOOR
11'-0"
3RD FLOOR
22'-10"
ROOF
34'-6"
ALLEY
(E) PARKING
002 - BOARD FORM

CONCRETE
003 - METAL

BALUSTRADE
004 - SCREEN
001 - SMOOTH

STUCCO FINISH
004 - SCREEN
003 - SCREEN
FRAME
004 - SCREEN
003 - METAL

BALUSTRADE
002 - BOARD

FORM CONCRETE
001 - PAINT

EXISTING BUILDING

TO MATCH ADDITION

92.51 SITE LOWEST POINT

92.51 MAX. HEIGHT PER
CCMC SEC.

17.300.025 (C)(4)

REFER TO LANDSCAPE
DWG

AIR-SPACE

ENCROACHMENT

AIR-SPACE

ENCROACHMENT
1ST FLOOR

95.81 ROOF GARDEN LEVEL
36'-0"

UTILITY POLE SET BACK
G095, TABLE 1 (F,7)

PROPERTY LINE

PROPERTY LINE
2'-0" REAR-YARD

SETBACK
0'-0" FRONT-YARD

SETBACK

ARCHITECTURAL SCREEN ENCROACHMENT
21".

AIR SPACE

ENCROACHMENT

AIR SPACE

ENCROACHMENT
54' - 5"
43'-0" MAX. HEIGHT PER SEC. 17.220.020(A) TABLE 2-6
39' - 4"
19'-6" MAX. PER 17.300.025(C)(2)(b)
15' - 2"
6' - 0"
6/9.3=.64 < 2/3=.66
3202.3.1
CANNOT EXCEED 2/3

ENCROACHMENT
(E) WALKWAY
9'-4"
15'-0"
13'-6" MAX. PER 17.300.025(C)(2)(b)
13'-6"

MECH UNIT

EXISTING

GRADING

NEW FENCE
HEIGHT: MATCH EXISTING
MATERIAL: MATCH EXISTING
6'-0".

AUXARCHITECTURE

CREATIVE COMMUNITY CENTER

ELEVATIONS
EXISTING T.O. ROOF
27'-7"
EXISTING T.O. ROOF
27'-7"
DE

92.51 SITE LOWEST POINT

92.51 92.51 SITE LOWEST POINT

92.51 1ST FLOOR

95.81 1ST FLOOR

95.81 9' - 11"

EXISTING A-FRAME
32' - 1" 48' - 2"

PROPERTY LINE

PROPERTY LINE EXISTING SIREN TO BE

RELOCATED
7' - 2"20' - 5"3' - 4"

EAST ELEVATION

EXISTING PROPOSED
PHASE TWO - AREA 2: PROPOSED ELEVATIONS

AUX ARCHITECTURE
2021.10.20
29 CULVER CITY COMPREHENSIVE PLAN
EXISTING T.O. ROOF
27'-7"
2ND FLOOR
11'-0"
3RD FLOOR
22'-10"
ROOF
34'-6"
1' - 6"11' - 8"11' - 10"11' - 0"3' - 4"
54' - 5"
ALLEY
(E) PARKING
002 - BOARD FORM

CONCRETE
003 - METAL

BALUSTRADE
004 - SCREEN
004 - SCREEN
005 - GLASS

BALUSTRADE
001 - SMOOTH

STUCCO FINISH
19'-6" MAX. PER 17.300.025(C)(2)(b)
15' - 2"
43'-0" MAX. HEIGHT PER SEC. 17.220.020(A) TABLE 2-6
39' - 4"

92.51 SITE LOWEST POINT

92.51 AIR-SPACE

ENCROACHMENT

AIR-SPACE

ENCROACHMENT
1ST FLOOR

95.81 ROOF GARDEN LEVEL
36'-0"

PROPERTY LINE

PROPERTY LINE

AIR-SPACE

ENCROACHMENT
G095,
TABLE 1
(F,7)
2'-0" REAR-YARD

SETBACK
0'-0" FRONT-YARD

SETBACK
6' - 0"

AIR-SPACE

ENCROACHMENT
21" .
6'-0"
6/9.3=.64 < 2/3=.66
3202.3.1
CANNOT EXCEED 2/3

ENCROACHMENT
(E) WALKWAY
9'-4"
15'-0"
13'-6" MAX. PER 17.300.025(C)(2)(b)
13'-6"

MECH UNIT
MAX. HEIGHT PER
CCMC SEC.

17.300.025 (C)(4)

REFER TO LANDSCAPE
DWG

MTL TEMPORARY FENCE

FOR FUTURE PHASE
(HEIGHT: 6' MIN - 8' MAX
MATERIAL: CHAINLINK)
60-DEGREE CLEAR ZONE ABOVE
FIRST 15 FT. OF BLDG. HT., PER
CCMC SEC. 17.220.020 TABLE
2-6

AUXARCHITECTURE

CREATIVE COMMUNITY CENTER

ELEVATIONS
EXISTING T.O. ROOF
27'-7"
EXISTING T.O. ROOF
27'-7"
D E

92.51 SITE LOWEST POINT

92.51 92.51 SITE LOWEST POINT

92.51 1ST FLOOR

95.81 1ST FLOOR

95.81 PROPERTY LINE

PROPERTY LINE

EXISTING A-FRAME
32' - 1" 9'-11"48'-2"
7' - 2"20' - 5"3' - 4"

WEST ELEVATION

EXISTING PROPOSED
PHASE TWO - AREA 2: PROPOSED ELEVATIONS

AUX ARCHITECTURE
2021.10.20
30 CULVER CITY COMPREHENSIVE PLAN
EXISTING T.O. ROOF
27'-7"
2ND FLOOR
11'-0"
3RD FLOOR
22'-10"
ROOF
34'-6"

92.51 SITE LOWEST POINT

92.51 MAX. HEIGHT PER
CCMC SEC.

17.300.025 (C)(4)

REFER TO LANDSCAPE
DWG
1ST FLOOR

95.81 ROOF GARDEN LEVEL
36'-0"
6' - 2"

ROOF GARDEN CABANA
10' - 6"6' - 11"4' - 9"11' - 10"11' - 0"3' - 4"

PROPERTY LINE

PROPERTY LINE
0'-0" SIDE-YARD

SETBACK
0'-0" SIDE-YARD

SETBACK

SIDE YARD ENCROACHMENT
32".
19'-6" MAX. PER 17.300.025(C)(2)(b)
13' - 6"
49'-6"
43'-0" MAX. HEIGHT PER SEC. 17.220.020(A) TABLE 2-6
36' - 0"

MECH UNIT

MTL TEMPORARY FENCE

FOR FUTURE PHASE
(HEIGHT: 6' MIN - 8' MAX
MATERIAL: CHAINLINK)
001 - SMOOTH

STUCCO FINISH
005 - ASPHALT

SHINGLES

AUXARCHITECTURE

CREATIVE COMMUNITY CENTER

ELEVATIONS
EXISTING T.O. ROOF
27'-7"
EXISTING T.O. ROOF
27'-7"
6 92.51 SITE LOWEST POINT

92.51 92.51 SITE LOWEST POINT

92.51 2
1ST FLOOR

95.81 1ST FLOOR

95.81 EXISTING A-FRAME
60' - 6"

PROPERTY LINE

PROPERTY LINE
8"
15'-2"
27' - 7"3' - 4"

SOUTH ELEVATION

EXISTING PROPOSED
PHASE TWO - AREA 2: PROPOSED ELEVATIONS

AUX ARCHITECTURE
2021.10.20
31 CULVER CITY COMPREHENSIVE PLAN

WHITE/FROSTED GLASS
CONCRETE “SANDBLASTED”

CLEAR SEALER, ANTI GRAFITTI COATING

WATERPROOFING
:ROLOC

TNIAP MIRT & HSINIF LEWORT HTOOMS OCCUTS

MUNIMULA DEZIDONA

ACCENT PAINT, WENDE MUSEUM LOGO RED

WHITE PAINT
WHITE/FROSTED GLASS CONCRETE “SANDBLASTED”

CLEAR SEALER, ANTI GRAFITTI COATING

WATERPROOFING
:ROLOC

TNIAP MIRT & HSINIF LEWORT HTOOMS OCCUTS

MUNIMULA DEZIDONA

ACCENT PAINT, WENDE MUSEUM LOGO RED

WHITE PAINT

PROPOSED MATERIAL BOARD
001 | PAINTED STUCCO 002 | CONCRETE 003 | ANODIZED ALUMINIUM 004 | COMPOSITE 005 | ASPHALT SHINGLES

AUX ARCHITECTURE
2021.10.20
32 CULVER CITY COMPREHENSIVE PLAN

EXTERIOR RENDERING - VIEW FROM PARKING ENTRY

AUX ARCHITECTURE
2021.10.20
33 CULVER CITY COMPREHENSIVE PLAN
- AERIAL VIEWEXTERIOR RENDERING

AUX ARCHITECTURE
2021.10.20
34 CULVER CITY COMPREHENSIVE PLAN
- VIEW FROM GARDENEXTERIOR RENDERING

AUX ARCHITECTURE
2021.10.20
35 CULVER CITY COMPREHENSIVE PLAN
- VIEW FROM GARDEN TOWARDS LOBBY ENTRANCEEXTERIOR RENDERING

AUX ARCHITECTURE
2021.10.20
36 CULVER CITY COMPREHENSIVE PLAN
- VIEW FROM PARKING LOT TOWARDS ENTRYEXTERIOR RENDERING

AUX ARCHITECTURE
2021.10.20
37 CULVER CITY COMPREHENSIVE PLAN
- VIEW LOOKING TOWARDS EXISTING MUSEUMEXTERIOR RENDERING

AUX ARCHITECTURE
2021.10.20
38 CULVER CITY COMPREHENSIVE PLAN
Phase Three Objectives
• Build low income artist housing units as a model for the success of affordable housing. • Create low income housing as part of the City’s housing production solutions.

• Build new affordable housing units that have a synergy with the Wende Museum and Creative Community Center by providing affordable housing for low-income artists. • Balance various community needs for affordable housing and a community garden. • Preserve or replace existing community amenities.

Phase Three is a City initiated joint project with Wende that will complement the other Project phases with a repurposed garden and six permanent supportive housing units for low-income homeless artist residents. The existing community garden will be reconfigured to include at-grade garden space adjacent to the housing units as well as in a portion of the existing parking lot, totaling 4,511 square feet of garden space; the existing community garden area is 4,507 square feet. The affordable housing component will be configured to accommodate up to six affordable dwelling units, measuring approximately 325 square feet each.

The City desires to create a synergy between the residents of the affordable housing and the Wende Museum and Creative Community Center. Residents would be low income artists, including those who have been persecuted or censored for their work. Collaboration with these artists would further the goals of the Wende’s mission. Such collaboration would also create benefits for the entire community and the artists themselves.

Architectural design of the residential units will be compatible with the style and quality of the adjacent Creative Community Center. The exact configuration and design of the residential units will be established at a future date through the City’s Conformance Review process. The below renderings demonstrate a design that could be adopted in the future for the affordable housing units, but are for illustrative purposes only.

PHASE THREE - AREA 3: COMMUNITY GARDEN & AFFORDABLE HOUSING

AUX ARCHITECTURE
2021.10.20
39 CULVER CITY COMPREHENSIVE PLAN
ALLEY
CULVER BLVD.

COOMBS AVE.

CREATIVE COMMUNITY CENTER

EXISTING A-FRAME

RELOCATED SIREN

EXISTING COMMERCIAL TRASH

ENCLOSURE

EXISTING GARDEN

EXISTING PARKING

THE WENDE MUSEUM
PHASE THREE - AREA 3: PROJECT SITE AXONOMETRIC

COMMUNITY GARDEN

HOUSING

PROPOSED RESIDENTIAL

TRASH ENCLOSURE
PHASE 2- AREA 2
PHASE 1- AREA 1
PHASE 3- AREA 3

AUX ARCHITECTURE
2021.10.20
40 CULVER CITY COMPREHENSIVE PLAN
-- PROPOSED HOUSING FLOOR AREA: 1,950 SQ. FT. (325 SQ. FT. / UNIT) - PROPOSED GARDEN:

PROPOSED HOUSING GARDEN: 1,780 SQ. FT.

PROPOSED GARDEN SPACE: 2,731 SQ. FT.

TOTAL PROPOSED GARDEN: 4,511 SQ. FT.
- PROPOSED PARKING ADJUSTMENTS:

EXISTING PARKING SPACES TO BE RECONFIGURED: 23 PARKING SPACES EXISTING ADA PARKING SPACES TO BE RELOCATED: 2 PARKING SPACES PARKING REDUCTION: 21 PARKING SPACES

- SITE AREA (LOTS 9-10) : 4,507 SQ. FT.
- EXISTING BUILDING AREA: 0 SQ. FT
- EXISTING GARDEN SPACE: 4,507 SQ. FT.
- EXISTING SITE COVERAGE: 0 SQ. FT. (GROSS)
UNIT 1:
325 SF
UNIT 1:
325 SF
UNIT 1:
325 SF
UNIT 1:
325 SF
UNIT 1:
325 SF
UNIT 1:
325 SF
25'-0" TYP.5'-0" 2'-10"
2'-0"
(MIN 2 FT

ALLEY SETBACK)
17'-0"
SITE AREA:4,507 SF
13'-0"
TYP.

UNIT:
325 SF
8"
83'-4"
UNIT:
325 SF
UNIT:
325 SF
UNIT:
325 SF
UNIT:
325 SF
UNIT:
325 SF
28'-0" 74'-9" (BUILDING)
2'-0"
6'-0"
10'-0"
6'-0"
- 17 EXISTING SPACES RECONFIGURED

FOR PUBLIC ACCESSIBLE GARDEN
ALLEY
27'-0"
(24'-0" MIN. BACKUP)
26'-5"
(EXISTING, VIF)
ADA-2 ADA-1
1819202122232425
- 6 EXISTING PARKING SPACES RECONFIGURED
FOR 2 ADA PARKING SPACES

PROPOSED DROP-OFF AREA
(E) PARKING
(E) FIREPLACE
(E) SIREN
(E) GUARDHOUSE
LOT 17LOT 16LOT 15LOT 14LOT 11,12,13
(E) WENDE MUSEUM GARDE
LOT 8LOT 7 LOT 9,10
GARDEN: 2,731SF
1234567891011121314151617
94'-2" (BUILDING)
4'-0"
64 GAL.

ORG.
64 GAL.

REF.
64 GAL.

REF.
64 GAL.

REC.
14'-6"
MTL. SLIDE GATE
CMU ENCLOSURE;
T.OW. 6 FT. MIN. - 8 FT
MAX. ABOVE ADJACENT

GRADING
GALV. STEEL POST SET IN
FOOTING.6'-0"
64 GAL.

ORG.
64 GAL.

REF.
64 GAL.

REF.
96 GAL.

REC.
4'-4"
NOTE(S):

1. TENANTS / PROPERTY MANAGEMENT

SHALL PLACE THE BINS IN ALLEY ON THE
TRASH COLLECTION SERVICE DAY.

SCALE:01 TRASH ENCLOSURE - PLAN
N.T.S.
14'-6"
MTL. SLIDE GATE
CMU ENCLOSURE;
T.OW. 6 FT. MIN. - 8 FT
MAX. ABOVE ADJACENT

GRADING
GALV. STEEL POST SET IN
FOOTING.6'-0"
64 GAL.

ORG.
64 GAL.

REF.
64 GAL.

REF.
96 GAL.

REC.
4'-4"
NOTE(S):

1. TENANTS / PROPERTY MANAGEMENT

SHALL PLACE THE BINS IN ALLEY ON THE
TRASH COLLECTION SERVICE DAY.

SCALE:01 TRASH ENCLOSURE - PLAN
N.T.S.
-- PROPOSED HOUSING FLOOR AREA: 1,950 SQ. FT. (325 SQ. FT. / UNIT) - PROPOSED GARDEN:

PROPOSED HOUSING GARDEN: 1,780 SQ. FT.

PROPOSED GARDEN SPACE: 2,731 SQ. FT.

TOTAL PROPOSED GARDEN: 4,511 SQ. FT.
- PROPOSED PARKING ADJUSTMENTS:

EXISTING PARKING SPACES TO BE RECONFIGURED: 23 PARKING SPACES EXISTING ADA PARKING SPACES TO BE RELOCATED: 2 PARKING SPACES PARKING REDUCTION: 21 PARKING SPACES

- SITE AREA (LOTS 9-10) : 4,507 SQ. FT.
- EXISTING BUILDING AREA: 0 SQ. FT
- EXISTING GARDEN SPACE: 4,507 SQ. FT.
- EXISTING SITE COVERAGE: 0 SQ. FT. (GROSS)
- AREA 3 - AREA 2 - AREA 1
PHASE THREE - AREA 3: PROJECT SITE PLAN

AUX ARCHITECTURE
2021.10.08
40 CULVER CITY COMPREHENSIVE PLAN
Approved Trash Enclosure
10/15/21, EPO - MN
PHASE THREE - AREA 3: PROJECT SITE PLAN

AUX ARCHITECTURE
2021.10.20
41 CULVER CITY COMPREHENSIVE PLAN
COMMUNITY GARDEN + HOUSING

AUX ARCHITECTURE
2021.10.20
42 CULVER CITY COMPREHENSIVE PLAN
COMMUNITY GARDEN + HOUSING

AUX ARCHITECTURE
2021.10.20
43 CULVER CITY COMPREHENSIVE PLAN

LAND USE & SITE DEVELOPMENT STANDARDS
General Plan
The General Plan Land Use designation of the Project site is Open Space. The Open Space designation is established to protect Culver City’s open space resources that include public or private land. It is designed and intended to preserve existing open space and foster compatible development and recreation opportunities. The proposed Creative Community Center will comport with the Open Space designation requirements of the General Plan.

Zoning
The Site was rezoned April 28, 2014 (ZCMA P2014018, Ordinance No. 2014-001) from Commercial Neighborhood (CN) to Open Space (OS) for General Plan conformance during the Museum entitlements. The purpose of the OS Zoning District is to:

1. Regulate, protect, and preserve publicly accessible land that is well suited for active recreation, amusement, relaxation, and/or scenic viewing.

2. Provide consistency with, and implement policies related to, those locations designated Open Space on the General Plan Land Use Element Map and in the General Plan text.

3. Provide a means for encouraging and promoting desirable park development and open space preservation that are compatible with surrounding neighborhoods and protect the existing quality of life.

4. Ensure that the development of new parks or other open space, as well as major modifications to existing resources, are compatible with surrounding neighborhoods through the adoption of a Comprehensive Plan showing proper orientation, desirable design characteristics and programming, and compatibility of uses.

5. Establish a set of regulations, requirements, and procedures that preclude any degradation in safety, security, and quality of life for residential properties adjacent to any OS-zoned parcels.

Pursuant to Section 17.250.030 of the CCMC, development and use of property within the Open Space Zoning District requires the amendment of the Comprehensive Plan. The Wende Museum was established through a Comprehensive Plan (P2013176) approved by City Council Ordinance No. 2014-001 in 2014. Further, pursuant to the CCMC, major changes to an approved Comprehensive Plan must be considered in the same manner.

The purpose of the Amendment No. 1 is to ensure that the modifications to the Site comport with the requirements of the CCMC and with the surrounding neighborhood through desirable design and use standards. The Comprehensive Plan establishes a set of regulations, requirements, and procedures that help prevent degradation in safety, security, and quality of life for residential properties adjacent to the property. The proposed Creative Community Center and residential uses will be compliant with the Open Space zoning for the site with appropriate design and uses.

Pursuant to the Zoning Code Amendment (P2020-0238-ZCA) adopted by City Council February 8, 2021 (Ordinance No. 2021-001), amending Section 17.400.065 – Mixed Use Development Standards, mixed use development may be allowed in an Open Space (OS) Zone at the discretion of the City Council when approved by City Council resolution based on the following findings:
a. Any displaced park space must be replaced with an equivalent amount of park space on the project site;
b. The project is public serving;
c. The project is consistent with the Purpose described in § 17.250.030.A.1 through A.5 of this Title;
d. The use complies with § 17.250.030 (Open Space District Requirements) of this Title Further, pursuant to Section 17.400.065.D, pertaining to permitted non-residential uses, pedestrian serving uses are required.

With the implementation of Phase 3, the Project will be considered a horizontally integrated mixed use development pursuant to Section 17.400.065, which allows mixed use in OS Zone. In addition, the Project will conform to Section

17.400.065.D, allowing retail/service uses in mixed use projects as an approved use in Comprehensive Plan Amendment No.1 with an equivalent amount of open space on the Project Site and because it is a publicly serving use that complies with the Purposes provisions of Section 17.250.030.A-1 through A 5 and with the Open Space District requirements of Section 17.250.030 of the Zoning Code. The Creative Community Center and community garden uses are considered pedestrian serving consistent with this Section of the Zoning Code.

AUX ARCHITECTURE
2021.10.20
44 CULVER CITY COMPREHENSIVE PLAN
Land Uses
The allowable land uses for the Project Site include utilization of the Wende Museum and the Creative Community Center as described, including flex space for events, workshops, tutoring, performances, etc. In addition, affordable housing development is also allowed on Area 3 of the Project Site. These uses conform to the intent of the Zoning Code and the General Plan.

Six affordable residential units are permitted in Area 3. Affordable housing built in conjunction with the arts and cultural programing at the Wende will enhance the impact and effectiveness of both community activity and housing.

Residences will have a relationship to the built environment, which offers unique opportunities for both the residents and the community. It is therefore important that the residents selected are integrated into the programming of the Wende campus and the Creative Community Center being built adjacent to housing so that there is a relationship between them. Architectural design of the residential units will follow in the spirit and quality of the adjacent Creative Community Center. The exact configuration and design of the residential units will be refined and established at a further date through the City’s Conformance Review process.

LAND USE & SITE DEVELOPMENT STANDARDS

AUX ARCHITECTURE
2021.10.20
45 CULVER CITY COMPREHENSIVE PLAN
Special Events & Temporary Events
As a cultural institution, from time to time, special events related to the Museum and Creative Community Center operations may occur, as discussed on the Recreational Activity Program section. These events are considered part of the operation of the Museum and Creative Community Center and are permitted without a Special Event Permit.

However, should issues arise from operation of the facility that result in detrimental impacts on the surrounding neighborhood, the City shall have the authority to require the applicant to apply for Special Event Permits, pursuant to Section 17.520 of the CCMC, on a case-by-case basis.

The The Wende will employ a Site Coordinator to ensure that special events minimize impacts to the community and address parking demand and supply.

Development Standards
This Comprehensive Plan provides policies, standards and regulations guiding the development and use of the Project Site. Table 2-1 specifies certain development standards. Specific topics not otherwise addressed or provided in this Comprehensive Plan shall be governed by the Culver City Municipal Code. No provision of this Comprehensive Plan is intended to repeal, abrogate, annul, impair, or interfere with any existing ordinance, resolutions, or policy except: a] as specifically repealed by the adoptions of this Comprehensive Plan; or b] where this Comprehensive Plan’s provisions are more precise or restrictive than the existing Municipal Code. Where provisions of this Comprehensive Plan impose more restrictive regulations than required by any other ordinance, resolution or policy, the provisions of this Comprehensive Plan shall govern.

Modifications to the Comprehensive Plan shall be pursuant to the Culver City Zoning Code, Section 17.560.025 – Comprehensive Plan Modifications, Major and Minor or as amended. In the event of a conflict between the Comprehensive Plan and any other ordinance, resolution or policy, the Director shall have the authority to resolve the conflict and determine what standard applies to the Comprehensive Plan.

LAND USE & SITE DEVELOPMENT STANDARDS

AUX ARCHITECTURE
2021.10.20
46 CULVER CITY COMPREHENSIVE PLAN
Parking
The Project Site is located adjacent to Veterans Park, including a number of recreation facilities, as well as the corresponding public parking lots, which contain a combined total of 305 public parking spaces (see attached Table 1 and Figure 1 from Civic Enterprise Association, LLC March 15, 2013 Wende Museum Parking Utilization Study [the “2013 Parking Utilization Study”]). In addition, per the 2013 Parking Utilization Study there are 100 on-street parking spaces located on the Overland Avenue, Barman Avenue and Coombs Avenue segments adjacent to the park that are for public use, with 86 of the parking spaces available on weekends. The existing public parking will serve the Wende Museum, the Creative Community Center and the affordable housing, as well as the existing uses on the subject parcel to the west and the uses at Veterans Park to the east. No additional parking is required for the uses proposed in Amendment No 1, per the Crain & Associates Parking Demand Study as described below.

Crain & Associates prepared a Parking Demand Study (the “2021 Study”) for Amendment No. 1, based on the 2013 Parking Utilization Study and the Revised Initial Traffic Analysis prepared by the Rifkin Transportation Planning Group approved January 30, 2013 (the “2013 Traffic Analysis”) and the Wende Museum Parking Utilization Study prepared by Civic Enterprise Associates, LLC dated March 15, 2013 (the “2013 Parking Utilization Study”). The parking requirement for the existing Museum based on the Culver City Municipal Code (“Code”) is 38 parking spaces.

The parking requirement for the Creative Community Center is 18 parking spaces and the parking requirement for the affordable housing is 8 parking spaces. Thus, the total Code required parking for the Site would be 64 parking spaces, as shown below.

Based on the data from the 2013 Parking Utilization Study and the methodology approved by the City, peak parking demand at the Site for existing and proposed uses (i.e. for the Museum, Creative Community Center and affordable housing) would be on Sunday at 2:00 and 3:00 pm with an estimated Project demand for 24 vehicles and an existing Wende Museum demand for 38 vehicles resulting in a total existing Wende Museum and Project parking demand of 62 vehicles. During this period, with the Project and other proposed modifications, there would be 99 parking spaces available within Lots 1 and 2, which would be more than enough to accommodate the existing Wende Museum and Project in their entirety, leaving 37parking spaces available for other nearby uses. Phase 3 will require converting 21 parking spaces into community garden space.

The 2021 Study also looked at the peak total parking occupancy rate for Lots 1 and 2. The study concluded that after construction of the Creative Community Center and affordable housing on Saturday at 1:00 and 2:00 PM parking demand would exceed the available 92 parking space supply in Lots 1 and 2 considering cumulative parking reductions. The highest peak would be at 2:00 PM when the parking demand would be 116 vehicles.. A generally accepted standard for off-street parking lots is that peak parking occupancy rates of 85-95% are considered to operate most effectively. For the 2013 Parking Utilization Study, a peak parking occupancy rate of 90% was used as the goal. Although the peak parking occupancy would surpass the Lots 1 and 2 parking supply, when considering the other four off-street public parking lots in the nearby vicinity, there would still be ample parking available to accommodate the operation of the Project. There would be a total of 56 available spaces, or a peak parking occupancy rate of 80%, across all six off-street parking lots. The highest peak parking occupancy across all six parking lots would occur on a Sunday at 11:00 AM with a peak parking occupancy rate of 83%. However, the proposed uses would only comprise of 12 vehicles, contributing approximately 5% of the parking demand for the hour.

LAND USE & SITE DEVELOPMENT STANDARDS

AUX ARCHITECTURE
2021.10.20
47 CULVER CITY COMPREHENSIVE PLAN
16 1979346.1
accepted standard for off-street parking lots is that peak parking occupancy rates of 85- 95% are considered to operate most effectively. For the 2013 P arking Utilization Study, a peak parking occupancy rate of 90% was used as the goa l. The peak parking occupancy would be on the higher end of the range. However, wh en considering the other four off-street public parking lots in the nearby vicinity, there would still be ample parking available to accommodate the operation of the Project w ith a total of 86 available spaces or a peak parking occupancy rate of 72% across all six off-street parking lots. The highest peak parking occupancy across all si x parking lots would occur on a Sunday at 11:00 AM with a peak parking occupancy rate of 77%. However, the proposed uses would only comprise of 11 vehicles, contributing approximately 5% of the parking demand for the hour.

Based on the above, the existing shared public parking will accommodate the existing and proposed uses. The new Creative Community Center will not result in an increase in number of people at the site beyond the Wende’s existing uses, which include a 173 seat assembly area. The Wende will hire a full-time Program Co ordinator for 10858 Culver Blvd to ensure that major events never occur at the same time at the Museum and at the Creative Community Center. The Program Coordinator will facilitate both externally with groups and individuals that might want to use the Creative Community Center, and internally to ensure that the Museum avoids double-booking major events (over 100 people) on the same n ight that the Creative Community Center is hosting another audience. Furthermore, since the Museum’s events are already attended by up to 500 guests—far past the potential capacity of the Creative Community Center— no net increase in parking or traffic demand is expected with Amendment No. 1.

Landscape
Parking
Based on the above, the existing pool of public parking will accommodate the existing and proposed uses, though it will be reduced to accommodate the reconfiguration of the community garden in Phase 3. The new Creative Community Center will not result in an increase in number of people at the site beyond the Wende’s existing uses, which include a 173 seat assembly area. The Wende will hire a full-time Program Coordinator for 10858 Culver Blvd to ensure that major events never occur at the same time at the Museum and at the Creative Community Center. The Program Coordinator will facilitate both externally with groups and individuals that might want to use the Creative Community Center, and internally to ensure that the Museum avoids double-booking major events (over 100 people) on the same night that the Creative Community Center is hosting another audience. Furthermore, since the Museum’s events are already attended by up to 500 guests, which far exceeds the capacity of the Creative Community Center, no net increase in parking or traffic demand is expected with Amendment No. 1.

All parking is under the jurisdiction of Parks, Recreation, and Community Services (PRCS). To the extent that the Creative Community Center requires reserved spaces, approval must occur through the PRCS process, which may require a rental fee for such parking spaces.

Table 1 and Figure 1 From 2013 Parking Utilization Study

LAND USE & SITE DEVELOPMENT STANDARDS
1 For parking purposes, the Creative Community Center consists of two components: one component is an 88-seat theater and the other is the functional extension of the museum: meeting rooms, classrooms, and office space. Use of both components at the same time shall be prohibited. Per the municipal code, the theater requires 18 parking spaces (1 space/5 fixed seats, totaling 17.6 parking spaces), while the meeting rooms, classrooms, and office space require 16 parking spaces (1 space/350 square feet, totaling 15.9 parking spaces). Accordingly, the Creative Community Center is required to provide 18 parking spaces, the greater number of these two requirements for the individual components.

AUX ARCHITECTURE
2021.10.20
48 CULVER CITY COMPREHENSIVE PLAN
THE WENDE MUSEUM ARMORY | CULVER CITY, CALIFORNIA
this is a copyrighted document containing copyrighted content and may not be reproduced in part or whole without written permission by PARAVANT Inc. | 2012 © PARAVANT ARCHITE CTS | 6017 WASHINGTON BLVD. | CULVER CITY, CA 90232 | WWW.PARAVANTARCHITECTS.COM | 310 795 7132 | 310 880 7307

LANDSCAPE
The Wende Museum garden will be a place of beauty, repose, and contemplation, but also a place for thinking about and confronting the complexities and tensions inherent in the collection itself, and tensions between a piece’s origin versus the Museum location, i.e. East v. West, Communism v. Capital- ism, Europe v. Southern California, Open v. Closed, Controlled/Constrained v. Free/Unconstrained, Art v. Propaganda. The tension and intimate connection between Eastern Europe and California is intended to be foregrounded throughout the Museum site. Los Angeles was the US capital of the Cold War, where most of the aerospace industry was based. The military-industrial complex, with its tight linkages between the armed forces, research universities, and corporations, found a perfect fit in the open, sunny, individualistic lifestyle of Southern California. The iconography of Southern California modernity, exemplified by the horizontal concrete building, and the skyline of palm trees, will be made explicit, against a series of controlled, European garden forms.

The basic principle is the bordering of the garden space with a classical hedge form, while Modernist forms and patterns serve as the backbone of the site. A visitor will walk through meandering spaces, with some views partially obscured by planting or decorative block walls, discovering the places where openings allow themto proceed, discovering new spaces and objects as they proceed. The objects will be worked into the landscape, some on plinths and some freestaning. The Expandable Space Hall, an East German modular building, will punctuate the view looking west from the Museum, and will act as a wall as well, blocking the way, but equally as an art object that can be walked around.

Subtropical vegetation will be planted throughout, such as specimen palms, dragon trees, aloes, and cactus, some of which will be “displayed” just like the objects, against hedges or walls. They, like the Cold War itself, especially the weaponry and the control structures like the Wall, will be at once beauti- ful, menacing, and sublime. At the center of the garden will be a large decomposed granite courtyard, which can be used to host events, movies, lectures, etc. Specimen trees and palms accentuate the modernity of the space, and provide shade. A lower garden, which will be visible from the sidewalk outside, will serve as an intimate space to display objects and for quieter contemplation.

The Culver Boulevard frontage will have a steel fence of rectangular pickets with no top rail, similar to the fence on the 6th street side of LACMA. The fence, coupled with shrubs and palms of varying heights, will allow passerby and drivers will be able to see partial views of pieces of the Berlin Wall segment, and other statues, lit at night.

The front of the Museum will be scattered with clusters of palms and boulders, with lower plants throughout a gravel mulch and decomposed granite groundcover. This motif continues along the parking lot edge, where groups of fan palms provide verticality to the building’s horizontal nature.

These are space of contemplation, symbolizing the coming together and resolution of reunification and the end of the Cold War’s decades of confrontation and conflict.

NOTE: Trees/plants shown adjacent are intended to illustrate general character, but are not comprehensive.

Proposed Plant Palette (partial)Landscape Narrative

PHOENIX CANARIENSIS

QUEEN PALM

DRACAENA DRACOBUTIA CAPITATA

AGAVE AMERICANA

AGAVE ATTENUATA

BAMBUSA OLDHAMII

ALOE ARBORESCENSFESTUCA GLAUCA

OLEA EUROPAEA

ALOE MARLOTHII

EUPHORBIA INGENS

SENECIO MANDRALISCAE STRELITZIA REGINAE

CYCAS REVOLUTA
CORDYLINE SPP.
44 LANDSCAPE & HARDSCAPE PALETTE: EXISTING LANDSCAPE
Subtropical vegetation is planted throughout the existing Wende Museum garden, such as specimen palms, dragon trees, aloes, and cactus, some of which will be “displayed” just like the objects, against hedges or walls. At the center of the garden there is a large decomposed granite courtyard, which is used to host events, movies, lectures, etc. Specimen trees and palms provide shade. A lower garden, which is visible from the sidewalk outside, serves as an intimate space to display objects. Drip irrigation will be provided for the landscaping.

The outdoor open space contains gathering spaces for groups large and small, seating areas, a fountain, art works and is surrounded by a steel fence of rectangular pickets with no top rail. The fence, coupled with shrubs and palms of varying heights, allows passerby and drivers to be able to see partial views of pieces of the Berlin Wall segment, and other statutes, lit at night.

The front of the Museum is scattered with clusters of palms and boulders, with lower plants throughout a gravel mulch and decomposed granite ground cover. This motif continues along the parking lot edge, where groups of fan palms provide verticality to the building’s horizontal nature.

NOTE: Trees/plants shown adjacent are intended to be illustrative only.

AUX ARCHITECTURE
2021.10.20
49 CULVER CITY COMPREHENSIVE PLAN
UP
DN

COMMUNITY OPEN SPACE
SITE STAIR 1
STAIR 2

VESTIBULE
(E)STAIR
(E) WENDE MUSEUM GARDEN
(E) PARKING
DN

TELESCOPING

SEATING
(59 SEATS)
STAGE

ELEVATOR
DN

96.11 F.S.

96.50 T.OW.

96.89 T.OW.

ENTRANCE GATE

PROPERTY LINE

PROPERTY LINE
(E) FENCE
ADA

SEATING
(5 SEATS)
(84 SEATS TOTAL)
(E) STATUE

96.04 96.11
DN

LANDING
0'-0" REAR-YARD SETBACK
0'-0" SIDE-YARD SETBACK
0'-0" SIDE-YARD SETBACK
0'-0" FRONT-YARD SETBACK

AIR-SPACE

ENCROACHMENT
(E) SIREN
SLOPED WALKWAY 2.0% MAX.

LANDING RAMP 8.3% MAX.

94.58 92.56

93.17 96.11

95.29 94.72
(E) GATE
MECHANICAL EQUIP.

SLOPED WALKWAY 2.0% MAX.

EC01
TREES

PLANTING LEGEND
SIZE & QUAN. WUCOLS

PHOENIX DACTYLIFERA

DATE PALM
MODERATE15FT. TRUNK HT./ 2 EA.

AGAVE ATTENUATA

FOXTAIL AGAVE
LOW5 GAL./ 13 EA.

MODERATE15 GAL./ 12 EA.

SHRUB & GROUND COVER
'SILVER DRAGON'

LIRIOPE SPICATA

VARIEGATED LILY TURF

STRELITZIA REGINAE

BIRD OF PARADISE
SIZE & QUAN. WUCOLS
5 GAL./ 6 EA.
1 GAL. @ 18" O.C./ 41 EA.
5 GAL. @ 24" O.C./ 35 EA.
1 GAL. @ 24" O.C./ 53 EA.

ANIGOZANTHOS FLAVIDUS

KANGAROO PAW
'BIG RED'

MUHLENBERGIA CAPILLARIS
'REGAL MIST'

PINK MUHLY

MODERATE

MODERATE

MODERATE

MODERATE

PODOCARPUS ELONGATUS
'MONMAL'

ICEE BLUE YELLOW WOOD

SENECIO MANDRALISCAE

KLEINIA
4" POT@12" O.C./ 107 EA. LOW
FILE NAME:

CERTIFICATION:
- PROJECT ADDRESS
10858 & 10876 CULVER BLVD.

CULVER CITY, CA 90230
- PROJECT OWNER
- SOILS ENGINEER
SUBSURFACE DESIGNS INC.
12848 FOOTHILL BLVD.

SYLMAR, CA 91342
T: 818-898-1595
- CIVIL ENGINEER
LC ENGINEERING GROUP, INC.
889 PIERCE CT., STE. 101
THOUSAND OAKS, CA 91360
T: 805-497-1244
- LANDSCAPE ARCHITECT

SQLA, INC
2669 SATURN ST
BREA, CA 92821
T: 562-905-0800
- STRUCTURAL ENGINEER

NOUS ENGINEERING
600 WILSHIRE BLVD. SUITE 760
LOS ANGELES, CA 90017
T: 213-627-6687
- MEP

ALFA TECH
510W 6TH STREET, SUITE #1105
LOS ANGELES, CA 90014
- LIGHTING & THEATER CONSULTANT

JOHN LEVY LIGHTING PRODUCTIONS, LLP
350 S FIGUEROA ST. #127
LOS ANGELES, CA 90071
T: 213-629-9949
- ACOUSTICAL CONSULTANT

NICK ANTONIO ACOUSTICS
4487 COLBATH AVE. #306
SHERMAN OAKS, CA 91423
T: 310-404-1833
- SECURITY CONSULTANT

SISTEMS INTEGRATION
606 S. HILL ST., SUITE #1009
LOS ANGELES, CA 90014
T: 213-623-5584
- SIGNAGE CONSULTANT

ROBERT FITCH DESIGN
1115 S ORANGE GROVE AVE. #1
LOS ANGELES, CA 90019
T: 323-424-3146
- SPECIFICATION CONSULTANT

CG-ASSOCIATES
2626 NAPLES AVE.

VENICE, CA 90291
T: 310-578-5773
ISSUE OR REVISION NOTES:

DRAWING TITLE:

SHEET NO:

DRAWING SCALE:

SHEET SIZE:

PROJECT NO:

DATE STAMP:
24x36
2404 WILSHIRE BLVD. STE. 12D
LOS ANGELES, CA 90057
TEL: 1.213.568.3578
ARCHITECT: BRIAN WICKERSHAM
LIC: CA C-32742 / EXP: 07.31.21
AUX

ARCHITECTURE

NOT FOR CONSTRUCTION
As indicated
12/17/2020 11:20:24 AM
C:\Users\Laguna\Documents\184_Wende_DD_BIM360_laguna432BN.rvt 22065

CREATIVE

COMMUNITY
CENTER
NO. DATE DESCRIPTION
T. 213-383-1788 (Studio)
2669 SATURN STREET
CA, 92821 F. [email protected]
T. 562-905-0800 (Main)
www.sqlainc.com
BREA,
Landscape Architects
Signature
Renewal Date
Date
2-28-2023
05-28-21
"I HAVE COMPLIED WITH THE CRITERIA OF THE

ORDINANCE AND APPLIED THEM FOR THE EFFICIENT USE OF WATER IN THE LANDSCAPE DESIGN PLANS".
1 PLANTING PLAN - FIRST FLOOR
SCALE: 1/8" = 1'-0"
0 4' 8' 16'
Scale: 1/8" = 1'-0"
LP-1

PLANTING PLAN
- FIRST FLOOR
NN

TRUE PROJECT

LIRIOPE SPICATA
'SILVER DRAGON'

VARIEGATED LILY TURF

MUHLENBERGIA CAPILLARIS
'REGAL MIST'

PINK MUHLY

ANIGOZANTHOS FLAVIDUS
'BIG RED'

KANGAROO PAW

PHOENIX DACTYLIFERA

DATE PALM

PODOCARPUS ELONGATUS
'MONMAL'

ICEE BLUE YELLOW WOOD

AGAVE ATTENUATA

FOXTAIL AGAVE

AGAVE ATTENUATA

FOXTAIL AGAVE

SENECIO MANDRALISCAE

KLEINIA
UP
DN

COMMUNITY OPEN SPACE
SITE STAIR 1
STAIR 2

VESTIBULE
(E)STAIR
(E) WENDE MUSEUM GARDEN
(E) PARKING
DN

TELESCOPING

SEATING
(59 SEATS)
STAGE

ELEVATOR
DN

96.11 F.S.

96.50 T.OW.

96.89 T.OW.

ENTRANCE GATE

PROPERTY LINE

PROPERTY LINE
(E) FENCE
ADA

SEATING
(5 SEATS)
(84 SEATS TOTAL)
(E) STATUE

96.04 96.11
DN

LANDING
0'-0" REAR-YARD SETBACK
0'-0" SIDE-YARD SETBACK
0'-0" SIDE-YARD SETBACK
0'-0" FRONT-YARD SETBACK

AIR-SPACE

ENCROACHMENT
(E) SIREN
SLOPED WALKWAY 2.0% MAX.

LANDING RAMP 8.3% MAX.

94.58 92.56

93.17 96.11

95.29 94.72
(E) GATE
MECHANICAL EQUIP.

SLOPED WALKWAY 2.0% MAX.

EC01
TREES

PLANTING LEGEND
SIZE & QUAN. WUCOLS

PHOENIX DACTYLIFERA

DATE PALM
MODERATE15FT. TRUNK HT./ 2 EA.

AGAVE ATTENUATA

FOXTAIL AGAVE
LOW5 GAL./ 13 EA.

MODERATE15 GAL./ 12 EA.

SHRUB & GROUND COVER
'SILVER DRAGON'

LIRIOPE SPICATA

VARIEGATED LILY TURF

STRELITZIA REGINAE

BIRD OF PARADISE
SIZE & QUAN. WUCOLS
5 GAL./ 6 EA.
1 GAL. @ 18" O.C./ 41 EA.
5 GAL. @ 24" O.C./ 35 EA.
1 GAL. @ 24" O.C./ 53 EA.

ANIGOZANTHOS FLAVIDUS

KANGAROO PAW
'BIG RED'

MUHLENBERGIA CAPILLARIS
'REGAL MIST'

PINK MUHLY

MODERATE

MODERATE

MODERATE

MODERATE

PODOCARPUS ELONGATUS
'MONMAL'

ICEE BLUE YELLOW WOOD

SENECIO MANDRALISCAE

KLEINIA
4" POT@12" O.C./ 107 EA. LOW
FILE NAME:

CERTIFICATION:
- PROJECT ADDRESS
10858 & 10876 CULVER BLVD.

CULVER CITY, CA 90230
- PROJECT OWNER
- SOILS ENGINEER
SUBSURFACE DESIGNS INC.
12848 FOOTHILL BLVD.

SYLMAR, CA 91342
T: 818-898-1595
- CIVIL ENGINEER
LC ENGINEERING GROUP, INC.
889 PIERCE CT., STE. 101
THOUSAND OAKS, CA 91360
T: 805-497-1244
- LANDSCAPE ARCHITECT

SQLA, INC
2669 SATURN ST
BREA, CA 92821
T: 562-905-0800
- STRUCTURAL ENGINEER

NOUS ENGINEERING
600 WILSHIRE BLVD. SUITE 760
LOS ANGELES, CA 90017
T: 213-627-6687
- MEP

ALFA TECH
510W 6TH STREET, SUITE #1105
LOS ANGELES, CA 90014
- LIGHTING & THEATER CONSULTANT

JOHN LEVY LIGHTING PRODUCTIONS, LLP
350 S FIGUEROA ST. #127
LOS ANGELES, CA 90071
T: 213-629-9949
- ACOUSTICAL CONSULTANT

NICK ANTONIO ACOUSTICS
4487 COLBATH AVE. #306
SHERMAN OAKS, CA 91423
T: 310-404-1833
- SECURITY CONSULTANT

SISTEMS INTEGRATION
606 S. HILL ST., SUITE #1009
LOS ANGELES, CA 90014
T: 213-623-5584
- SIGNAGE CONSULTANT

ROBERT FITCH DESIGN
1115 S ORANGE GROVE AVE. #1
LOS ANGELES, CA 90019
T: 323-424-3146
- SPECIFICATION CONSULTANT

CG-ASSOCIATES
2626 NAPLES AVE.

VENICE, CA 90291
T: 310-578-5773
ISSUE OR REVISION NOTES:

DRAWING TITLE:

SHEET NO:

DRAWING SCALE:

SHEET SIZE:

PROJECT NO:

DATE STAMP:
24x36
2404 WILSHIRE BLVD. STE. 12D
LOS ANGELES, CA 90057
TEL: 1.213.568.3578
ARCHITECT: BRIAN WICKERSHAM
LIC: CA C-32742 / EXP: 07.31.21
AUX

ARCHITECTURE

NOT FOR CONSTRUCTION
As indicated
12/17/2020 11:20:24 AM
C:\Users\Laguna\Documents\184_Wende_DD_BIM360_laguna432BN.rvt 22065

CREATIVE

COMMUNITY
CENTER
NO. DATE DESCRIPTION
T. 213-383-1788 (Studio)
2669 SATURN STREET
CA, 92821 F. [email protected]
T. 562-905-0800 (Main)
www.sqlainc.com
BREA,
Landscape Architects
Signature
Renewal Date
Date
2-28-2023
05-28-21
"I HAVE COMPLIED WITH THE CRITERIA OF THE

ORDINANCE AND APPLIED THEM FOR THE EFFICIENT USE OF WATER IN THE LANDSCAPE DESIGN PLANS".
1 PLANTING PLAN - FIRST FLOOR
SCALE: 1/8" = 1'-0"
0 4' 8' 16'
Scale: 1/8" = 1'-0"
LP-1

PLANTING PLAN
- FIRST FLOOR
NN

TRUE PROJECT

LIRIOPE SPICATA
'SILVER DRAGON'

VARIEGATED LILY TURF

MUHLENBERGIA CAPILLARIS
'REGAL MIST'

PINK MUHLY

ANIGOZANTHOS FLAVIDUS
'BIG RED'

KANGAROO PAW

PHOENIX DACTYLIFERA

DATE PALM

PODOCARPUS ELONGATUS
'MONMAL'

ICEE BLUE YELLOW WOOD

AGAVE ATTENUATA

FOXTAIL AGAVE

AGAVE ATTENUATA

FOXTAIL AGAVE

SENECIO MANDRALISCAE

KLEINIA
UP
UP
DN
769 SF

CLASSROOM
201
230 SF

EDUCATION
/TUTORIAL
ROOM
202148 SF

STORAGE
203
STAIR 2

PLANTER

ELEVATOR

ROOF BELOW

AIR-SPACE

ENCROACHMENT

EXISTING BUILDING
BELOW
ROOF
SLOPES
DN
ROOF
SLOPES
DN
STAIR 1
S1
107.28 107.28
0'-0" REAR-YARD SETBACK
0'-0" SIDE-YARD SETBACK
0'-0" SIDE-YARD SETBACK
0'-0" FRONT-YARD SETBACK

SIDE-YARD

ENCROACHMENT

CORRIDOR
205

PLANTER
110.4% 110.4%

PLANTING LEGEND

SHRUB & GROUND COVER

CALANDRIANIA SPECTABILIS

ROCK PURSLANE

SENECIO MANDRALISCAE

KLEINIA

ALOE STRIATA

CORAL ALOE
SIZE & QUAN. WUCOLS
1 GAL.@24" O.C./ 32 EA. LOW
4" POT@12" O.C./ 122 EA. LOW
1 GAL.@12" O.C. / 106 EA. LOW

KALANCHOE LUCIAE

PADDLE PLANT
1 GAL.@18" O.C. / 48 EA. LOW

STRING OF BANANAS
4" POT @ 12" O.C./ 57 EA. LOWSENECIO RADICANS
FILE NAME:

CERTIFICATION:
- PROJECT ADDRESS
10858 & 10876 CULVER BLVD.

CULVER CITY, CA 90230
- PROJECT OWNER
- SOILS ENGINEER
SUBSURFACE DESIGNS INC.
12848 FOOTHILL BLVD.

SYLMAR, CA 91342
T: 818-898-1595
- CIVIL ENGINEER
LC ENGINEERING GROUP, INC.
889 PIERCE CT., STE. 101
THOUSAND OAKS, CA 91360
T: 805-497-1244
- LANDSCAPE ARCHITECT

SQLA, INC
2669 SATURN ST
BREA, CA 92821
T: 562-905-0800
- STRUCTURAL ENGINEER

NOUS ENGINEERING
600 WILSHIRE BLVD. SUITE 760
LOS ANGELES, CA 90017
T: 213-627-6687
- MEP

ALFA TECH
510W 6TH STREET, SUITE #1105
LOS ANGELES, CA 90014
- LIGHTING & THEATER CONSULTANT

JOHN LEVY LIGHTING PRODUCTIONS, LLP
350 S FIGUEROA ST. #127
LOS ANGELES, CA 90071
T: 213-629-9949
- ACOUSTICAL CONSULTANT

NICK ANTONIO ACOUSTICS
4487 COLBATH AVE. #306
SHERMAN OAKS, CA 91423
T: 310-404-1833
- SECURITY CONSULTANT

SISTEMS INTEGRATION
606 S. HILL ST., SUITE #1009
LOS ANGELES, CA 90014
T: 213-623-5584
- SIGNAGE CONSULTANT

ROBERT FITCH DESIGN
1115 S ORANGE GROVE AVE. #1
LOS ANGELES, CA 90019
T: 323-424-3146
- SPECIFICATION CONSULTANT

CG-ASSOCIATES
2626 NAPLES AVE.

VENICE, CA 90291
T: 310-578-5773
ISSUE OR REVISION NOTES:

DRAWING TITLE:

SHEET NO:

DRAWING SCALE:

SHEET SIZE:

PROJECT NO:

DATE STAMP:
24x36
2404 WILSHIRE BLVD. STE. 12D
LOS ANGELES, CA 90057
TEL: 1.213.568.3578
ARCHITECT: BRIAN WICKERSHAM
LIC: CA C-32742 / EXP: 07.31.21
AUX

ARCHITECTURE

NOT FOR CONSTRUCTION
As indicated
12/17/2020 11:20:24 AM
C:\Users\Laguna\Documents\184_Wende_DD_BIM360_laguna432BN.rvt 22065

CREATIVE

COMMUNITY
CENTER
NO. DATE DESCRIPTION
T. 213-383-1788 (Studio)
2669 SATURN STREET
CA, 92821 F. [email protected]
T. 562-905-0800 (Main)
www.sqlainc.com
BREA,
Landscape Architects
Signature
Renewal Date
Date
2-28-2023
05-28-21
"I HAVE COMPLIED WITH THE CRITERIA OF THE

ORDINANCE AND APPLIED THEM FOR THE EFFICIENT USE OF WATER IN THE LANDSCAPE DESIGN PLANS".
1 PLANTING PLAN - SECOND FLOOR
SCALE: 1/8" = 1'-0"
0 4' 8' 16'
Scale: 1/8" = 1'-0"
LP-2

PLANTING PLAN
- SECOND FLOOR
NN

TRUE PROJECT

SENECIO RADICANS

STRING OF BANANAS

KALANCHOE LUCIAE

PADDLE PLANT

ALOE STRIATASENECIO MANDRALISCAE

KLEINIA

CALANDRIANIA SPECTABILIS

ROCK PURSLANE
DN STAIR 2
110.4% 110.4%
ROOF
SLOPES
DN
ROOF
SLOPES
DN

ELEVATOR

AIR-SPACE

ENCROACHMENT
ROOF
SLOPES
DN
0'-0" REAR-YARD SETBACK
0'-0" SIDE-YARD SETBACK
0'-0" SIDE-YARD SETBACK
0'-0" FRONT-YARD SETBACK
54 SF
ELEV. MACHINE
ROOM
402

UTILITY
403

2.3%

3.2%

4.2%

SHRUB & GROUND COVER

CALANDRIANIA SPECTABILIS

ROCK PURSLANE

SENECIO MANDRALISCAE

KLEINIA

ALOE STRIATA

CORAL ALOE
SIZE & QUAN. WUCOLS
1 GAL.@24" O.C./ 31 EA. LOW
4" POT@12" O.C./ 111 EA. LOW
1 GAL.@12" O.C. / 122 EA. LOW

KALANCHOE LUCIAE

PADDLE PLANT
1 GAL.@18" O.C. / 64 EA. LOW
5 GAL.@24" O.C./ 16 EA. LOW
1 GAL.@18" O.C./ 139 EA. LOWDIANELLA REVOLUTA
'ALLYN-CITATION'

COOLVISTA DIANELLA
24" BOX / 2 EA.

SIZE & QUAN. TREES WUCOLS

CERCIDIUM HYBRID
'DESERT MUSEUM'

DESERT MUSEUM PALO VERDE
LOW

AGAVE ATTENUATA
'RED MARGIN'

AGAVE RED MARGIN
FILE NAME:

CERTIFICATION:
- PROJECT ADDRESS
10858 & 10876 CULVER BLVD.

CULVER CITY, CA 90230
- PROJECT OWNER
- SOILS ENGINEER
SUBSURFACE DESIGNS INC.
12848 FOOTHILL BLVD.

SYLMAR, CA 91342
T: 818-898-1595
- CIVIL ENGINEER
LC ENGINEERING GROUP, INC.
889 PIERCE CT., STE. 101
THOUSAND OAKS, CA 91360
T: 805-497-1244
- LANDSCAPE ARCHITECT

SQLA, INC
2669 SATURN ST
BREA, CA 92821
T: 562-905-0800
- STRUCTURAL ENGINEER

NOUS ENGINEERING
600 WILSHIRE BLVD. SUITE 760
LOS ANGELES, CA 90017
T: 213-627-6687
- MEP

ALFA TECH
510W 6TH STREET, SUITE #1105
LOS ANGELES, CA 90014
- LIGHTING & THEATER CONSULTANT

JOHN LEVY LIGHTING PRODUCTIONS, LLP
350 S FIGUEROA ST. #127
LOS ANGELES, CA 90071
T: 213-629-9949
- ACOUSTICAL CONSULTANT

NICK ANTONIO ACOUSTICS
4487 COLBATH AVE. #306
SHERMAN OAKS, CA 91423
T: 310-404-1833
- SECURITY CONSULTANT

SISTEMS INTEGRATION
606 S. HILL ST., SUITE #1009
LOS ANGELES, CA 90014
T: 213-623-5584
- SIGNAGE CONSULTANT

ROBERT FITCH DESIGN
1115 S ORANGE GROVE AVE. #1
LOS ANGELES, CA 90019
T: 323-424-3146
- SPECIFICATION CONSULTANT

CG-ASSOCIATES
2626 NAPLES AVE.

VENICE, CA 90291
T: 310-578-5773
ISSUE OR REVISION NOTES:

DRAWING TITLE:

SHEET NO:

DRAWING SCALE:

SHEET SIZE:

PROJECT NO:

DATE STAMP:
24x36
2404 WILSHIRE BLVD. STE. 12D
LOS ANGELES, CA 90057
TEL: 1.213.568.3578
ARCHITECT: BRIAN WICKERSHAM
LIC: CA C-32742 / EXP: 07.31.21
AUX

ARCHITECTURE

NOT FOR CONSTRUCTION
As indicated
12/17/2020 11:20:24 AM
C:\Users\Laguna\Documents\184_Wende_DD_BIM360_laguna432BN.rvt 22065

CREATIVE

COMMUNITY
CENTER
NO. DATE DESCRIPTION
T. 213-383-1788 (Studio)
2669 SATURN STREET
CA, 92821 F. [email protected]
T. 562-905-0800 (Main)
www.sqlainc.com
BREA,
Landscape Architects
Signature
Renewal Date
Date
2-28-2023
05-28-21
"I HAVE COMPLIED WITH THE CRITERIA OF THE

ORDINANCE AND APPLIED THEM FOR THE EFFICIENT USE OF WATER IN THE LANDSCAPE DESIGN PLANS".
1 PLANTING PLAN - ROOF LEVEL
SCALE: 1/8" = 1'-0"
0 4' 8' 16'
Scale: 1/8" = 1'-0"
LP-4

PLANTING PLAN
- ROOF LEVEL

AGAVE ATTENUATA
'RED MARGIN'

AGAVE RED MARGIN
NN

TRUE PROJECT

KALANCHOE LUCIAE

PADDLE PLANT

ALOE STRIATA

SENECIO MANDRALISCAE

KLEINIA

CALANDRIANIA SPECTABILIS

ROCK PURSLANE

DIANELLA REVOLUTA
'ALLYN-CITATION'

COOLVISTA DIANELLA

CERCIDIUM HYBRID
'DESERT MUSEUM'

DESERT MUSEUM PALO VERDE
DN STAIR 2
110.4% 110.4%
ROOF
SLOPES
DN
ROOF
SLOPES
DN

ELEVATOR

AIR-SPACE

ENCROACHMENT
ROOF
SLOPES
DN
0'-0" REAR-YARD SETBACK
0'-0" SIDE-YARD SETBACK
0'-0" SIDE-YARD SETBACK
0'-0" FRONT-YARD SETBACK
54 SF
ELEV. MACHINE
ROOM
402

UTILITY
403

2.3%

3.2%

4.2%

SHRUB & GROUND COVER

CALANDRIANIA SPECTABILIS

ROCK PURSLANE

SENECIO MANDRALISCAE

KLEINIA

ALOE STRIATA

CORAL ALOE
SIZE & QUAN. WUCOLS
1 GAL.@24" O.C./ 31 EA. LOW
4" POT@12" O.C./ 111 EA. LOW
1 GAL.@12" O.C. / 122 EA. LOW

KALANCHOE LUCIAE

PADDLE PLANT
1 GAL.@18" O.C. / 64 EA. LOW
5 GAL.@24" O.C./ 16 EA. LOW
1 GAL.@18" O.C./ 139 EA. LOWDIANELLA REVOLUTA
'ALLYN-CITATION'

COOLVISTA DIANELLA
24" BOX / 2 EA.

SIZE & QUAN. TREES WUCOLS

CERCIDIUM HYBRID
'DESERT MUSEUM'

DESERT MUSEUM PALO VERDE
LOW

AGAVE ATTENUATA
'RED MARGIN'

AGAVE RED MARGIN
FILE NAME:

CERTIFICATION:
- PROJECT ADDRESS
10858 & 10876 CULVER BLVD.

CULVER CITY, CA 90230
- PROJECT OWNER
- SOILS ENGINEER
SUBSURFACE DESIGNS INC.
12848 FOOTHILL BLVD.

SYLMAR, CA 91342
T: 818-898-1595
- CIVIL ENGINEER
LC ENGINEERING GROUP, INC.
889 PIERCE CT., STE. 101
THOUSAND OAKS, CA 91360
T: 805-497-1244
- LANDSCAPE ARCHITECT

SQLA, INC
2669 SATURN ST
BREA, CA 92821
T: 562-905-0800
- STRUCTURAL ENGINEER

NOUS ENGINEERING
600 WILSHIRE BLVD. SUITE 760
LOS ANGELES, CA 90017
T: 213-627-6687
- MEP

ALFA TECH
510W 6TH STREET, SUITE #1105
LOS ANGELES, CA 90014
- LIGHTING & THEATER CONSULTANT

JOHN LEVY LIGHTING PRODUCTIONS, LLP
350 S FIGUEROA ST. #127
LOS ANGELES, CA 90071
T: 213-629-9949
- ACOUSTICAL CONSULTANT

NICK ANTONIO ACOUSTICS
4487 COLBATH AVE. #306
SHERMAN OAKS, CA 91423
T: 310-404-1833
- SECURITY CONSULTANT

SISTEMS INTEGRATION
606 S. HILL ST., SUITE #1009
LOS ANGELES, CA 90014
T: 213-623-5584
- SIGNAGE CONSULTANT

ROBERT FITCH DESIGN
1115 S ORANGE GROVE AVE. #1
LOS ANGELES, CA 90019
T: 323-424-3146
- SPECIFICATION CONSULTANT

CG-ASSOCIATES
2626 NAPLES AVE.

VENICE, CA 90291
T: 310-578-5773
ISSUE OR REVISION NOTES:

DRAWING TITLE:

SHEET NO:

DRAWING SCALE:

SHEET SIZE:

PROJECT NO:

DATE STAMP:
24x36
2404 WILSHIRE BLVD. STE. 12D
LOS ANGELES, CA 90057
TEL: 1.213.568.3578
ARCHITECT: BRIAN WICKERSHAM
LIC: CA C-32742 / EXP: 07.31.21
AUX

ARCHITECTURE

NOT FOR CONSTRUCTION
As indicated
12/17/2020 11:20:24 AM
C:\Users\Laguna\Documents\184_Wende_DD_BIM360_laguna432BN.rvt 22065

CREATIVE

COMMUNITY
CENTER
NO. DATE DESCRIPTION
T. 213-383-1788 (Studio)
2669 SATURN STREET
CA, 92821 F. [email protected]
T. 562-905-0800 (Main)
www.sqlainc.com
BREA,
Landscape Architects
Signature
Renewal Date
Date
2-28-2023
05-28-21
"I HAVE COMPLIED WITH THE CRITERIA OF THE

ORDINANCE AND APPLIED THEM FOR THE EFFICIENT USE OF WATER IN THE LANDSCAPE DESIGN PLANS".
1 PLANTING PLAN - ROOF LEVEL
SCALE: 1/8" = 1'-0"
0 4' 8' 16'
Scale: 1/8" = 1'-0"
LP-4

PLANTING PLAN
- ROOF LEVEL

AGAVE ATTENUATA
'RED MARGIN'

AGAVE RED MARGIN
NN

TRUE PROJECT

KALANCHOE LUCIAE

PADDLE PLANT

ALOE STRIATA

SENECIO MANDRALISCAE

KLEINIA

CALANDRIANIA SPECTABILIS

ROCK PURSLANE

DIANELLA REVOLUTA
'ALLYN-CITATION'

COOLVISTA DIANELLA

CERCIDIUM HYBRID
'DESERT MUSEUM'

DESERT MUSEUM PALO VERDE

GROUNDCOVER SHRUBS TREES
The concept for the proposed landscape at the Expansion Area aims to tie in with that of the Wende Museum by extending the space by approximately 30 feet in length, and visually by utilizing the same hardscape, softscape and planting palettes, with additional plant species introduced for the roof garden spaces. The goal for the proposed landscape is to extend the open space beyond the ground level by bringing greenery onto each level, terminating with a multi-purpose roof terrace with a designated space for productive community gardening.

The landscape design will also meet all requirements set forth by Section 17.310 – Landscaping of the Culver City Municipal Code.

LANDSCAPE & HARDSCAPE PALETTE: PROPOSED LANDSCAPE

AUX ARCHITECTURE
2021.10.20
50 CULVER CITY COMPREHENSIVE PLAN
TOTAL LANDSCAPE AREA = 623 SF.

TOTAL HARDSCAPE AREA = 1,941 SF.

FILE NAME:

CERTIFICATION:

ISSUE OR REVISION NOTES:

DRAWING TITLE:

SHEET NO:

DRAWING SCALE:

SHEET SIZE:

PROJECT NO:

DATE STAMP:
24x36
2404 WILSHIRE BLVD. STE. 12D
LOS ANGELES, CA 90057
TEL: 1.213.568.3578
ARCHITECT: BRIAN WICKERSHAM
LIC: CA C-32742 / EXP: 07.31.21
AUX

ARCHITECTURE

NOT FOR CONSTRUCTION
As indicated
12/17/2020 11:20:24 AM
C:\Users\Laguna\Documents\184_Wende_DD_BIM360_laguna432BN.rvt NO. DATE DESCRIPTION
Signature
Renewal Date
Date
2-28-2023
06-09-21
"I HAVE COMPLIED WITH THE CRITERIA OF THE

ORDINANCE AND APPLIED THEM FOR THE EFFICIENT USE OF WATER IN THE LANDSCAPE DESIGN PLANS". 2669 Saturn Street
CA, 92821 F. 562-905-0880
[email protected]
T. 562-905-0800
www.sqlainc.com
BREA,
Landscape Architects
06/09/21 50% CONSTRUCTION DOCUMENTS
09/24/21 75% CD (PLAN CHECK SET)
1 HARDSCAPE PLAN - FIRST FLOOR
SCALE: 1/8" = 1'-0" 0 4' 8' 16'
Scale: 1/8" = 1'-0"
LC-1

HARDSCAPE PLAN
- FIRST FLOOR
N

KEYNOTES

1. ENTRANCE GATE

2. METAL FENCE TO MATCH EX. FENCE.

3.ON GRADE PLANTING

4. CONC. PAVING

5. DECOMPOSED GRANITE

6. CONC. PLANTER W/ BOARDFORMED FINISH PER ARCH.

7. BUILT-IN BENCH

KEY PLAN
* PLEASE REFER TO ARCH SHEET "A2.11" FOR ALL DRAINAGES
5 SCOPE OF WORK AREA
Landscape Architects

PROPOSED HARDSCAPE - GROUND LEVEL

AUX ARCHITECTURE
2021.10.20
51 CULVER CITY COMPREHENSIVE PLAN
Landscape Architects
TOTAL LANDSCAPE AREA = 501 SF.

TOTAL HARDSCAPE AREA = 232 SF.

FILE NAME:

CERTIFICATION:

ISSUE OR REVISION NOTES:

DRAWING TITLE:

SHEET NO:

DRAWING SCALE:

SHEET SIZE:

PROJECT NO:

DATE STAMP:
24x36
2404 WILSHIRE BLVD. STE. 12D
LOS ANGELES, CA 90057
TEL: 1.213.568.3578
ARCHITECT: BRIAN WICKERSHAM
LIC: CA C-32742 / EXP: 07.31.21
AUX

ARCHITECTURE

NOT FOR CONSTRUCTION
As indicated
12/17/2020 11:20:24 AM
C:\Users\Laguna\Documents\184_Wende_DD_BIM360_laguna432BN.rvt NO. DATE DESCRIPTION
Signature
Renewal Date
Date
2-28-2023
06-09-21
"I HAVE COMPLIED WITH THE CRITERIA OF THE

ORDINANCE AND APPLIED THEM FOR THE EFFICIENT USE OF WATER IN THE LANDSCAPE DESIGN PLANS". 2669 Saturn Street
CA, 92821 F. 562-905-0880
[email protected]
T. 562-905-0800
www.sqlainc.com
BREA,
Landscape Architects
06/09/21 50% CONSTRUCTION DOCUMENTS
09/24/21 75% CD (PLAN CHECK SET)
1 HARDSCAPE PLAN - SECOND LEVEL
SCALE: 1/8" = 1'-0" 0 4' 8' 16'
Scale: 1/8" = 1'-0"
LC-2

HARDSCAPE PLAN
- SECOND LEVEL

KEYNOTES

1. CONC. PAVING PER ARCH.

2. DEPRESSED PLANTER

3. 42" GUARDRAIL, SEE ARCH. DWGS.

4. ALUMINUM SCREEN, SEE ARCH. DWGS.

N
* PLEASE REFER TO ARCH SHEET "A2.13" FOR PLANTER DRAINS - SECOND FLOOR PLANPROPOSED HARDSCAPE

AUX ARCHITECTURE
2021.10.20
52 CULVER CITY COMPREHENSIVE PLAN
Landscape Architects
TOTAL LANDSCAPE AREA = 347 SF.

TOTAL HARDSCAPE AREA = 227 SF.

FILE NAME:

CERTIFICATION:

ISSUE OR REVISION NOTES:

DRAWING TITLE:

SHEET NO:

DRAWING SCALE:

SHEET SIZE:

PROJECT NO:

DATE STAMP:
24x36
2404 WILSHIRE BLVD. STE. 12D
LOS ANGELES, CA 90057
TEL: 1.213.568.3578
ARCHITECT: BRIAN WICKERSHAM
LIC: CA C-32742 / EXP: 07.31.21
AUX

ARCHITECTURE

NOT FOR CONSTRUCTION
As indicated
12/17/2020 11:20:24 AM
C:\Users\Laguna\Documents\184_Wende_DD_BIM360_laguna432BN.rvt NO. DATE DESCRIPTION
Signature
Renewal Date
Date
2-28-2023
06-09-21
"I HAVE COMPLIED WITH THE CRITERIA OF THE

ORDINANCE AND APPLIED THEM FOR THE EFFICIENT USE OF WATER IN THE LANDSCAPE DESIGN PLANS". 2669 Saturn Street
CA, 92821 F. 562-905-0880
[email protected]
T. 562-905-0800
www.sqlainc.com
BREA,
Landscape Architects
06/09/21 50% CONSTRUCTION DOCUMENTS
09/24/21 75% CD (PLAN CHECK SET)
1 HARDSCAPE PLAN - THIRD LEVEL
SCALE: 1/8" = 1'-0"
0 4' 8' 16'
Scale: 1/8" = 1'-0"
LC-3

HARDSCAPE PLAN
- THIRD LEVEL
N

KEYNOTES

1. CONC. PAVING PER ARCH.

2. DEPRESSED PLANTER

3. 42" GUARDRAIL, SEE ARCH. DWGS.

4. ALUMINUM SCREEN, SEE ARCH. DWGS.
* PLEASE REFER TO ARCH SHEET "A2.12" FOR PLANTER DRAINS - THIRD FLOOR PLANPROPOSED HARDSCAPE

AUX ARCHITECTURE
2021.10.20
53 CULVER CITY COMPREHENSIVE PLAN
H.B.
(3) 60"L X 24"W X 24"H
(3) 72"L X 24"W X 24"H
COUNTER: 41 SF
OCCUPABLE AREA: 692 SF
ROOF COMMON OPEN SPACE = XXX SF
LANDSCAPE AREA: 377 SF (XX%)
C�MM�� �P�� SPAC� PR��ID�D�
TOTAL LANDSCAPE AREA = 843 SF.

TOTAL HARDSCAPE AREA = 778 SF.
(2) 40" X 40" X 36"H
FILE NAME:

CERTIFICATION:

ISSUE OR REVISION NOTES:

DRAWING TITLE:

SHEET NO:

DRAWING SCALE:

SHEET SIZE:

PROJECT NO:

DATE STAMP:
24x36
2404 WILSHIRE BLVD. STE. 12D
LOS ANGELES, CA 90057
TEL: 1.213.568.3578
ARCHITECT: BRIAN WICKERSHAM
LIC: CA C-32742 / EXP: 07.31.21
AUX

ARCHITECTURE

NOT FOR CONSTRUCTION
As indicated
12/17/2020 11:20:24 AM
C:\Users\Laguna\Documents\184_Wende_DD_BIM360_laguna432BN.rvt NO. DATE DESCRIPTION
Signature
Renewal Date
Date
2-28-2023
06-09-21
"I HAVE COMPLIED WITH THE CRITERIA OF THE

ORDINANCE AND APPLIED THEM FOR THE EFFICIENT USE OF WATER IN THE LANDSCAPE DESIGN PLANS". 2669 Saturn Street
CA, 92821 F. 562-905-0880
[email protected]
T. 562-905-0800
www.sqlainc.com
BREA,
Landscape Architects
06/09/21 50% CONSTRUCTION DOCUMENTS
09/24/21 75% CD (PLAN CHECK SET)
LC-4

HARDSCAPE PLAN
- ROOF LEVEL
1 HARDSCAPE PLAN - ROOF LEVEL
SCALE: 1/8" = 1'-0"
0 4' 8' 16'
Scale: 1/8" = 1'-0"

KEYNOTES

1. GREEN ROOF (ADD ALT. ITEM)

5. PREFAB CABANA W/ SOFA/COFFEE TABLE (ADD ALT. ITEM)

4. COMMUNAL DINING TABLE (ADD ALT. ITEM)

3. IPE WOOD TILE ON PEDESTAL (ADD ALT. ITEM)

2. 42" METAL GUARDRAIL, SEE ARCH. DWGS.

N

6. SNACK & DRINK BAR

9. PEDESTAL PORCELAIN PAVER (ADD ALT. ITEM)

8. SQUARO PLANTER W/ EVER GREEN TREE (ADD ALT. ITEM)

7. NATIVE & SUCCULENT GARDEN (PLANTS ARE ADD ALT. ITEM)

10. B2G PREFAB. PLANTER (ADD ALT. ITEM)
ALT. DESIGN AREA
* PLEASE REFER TO ARCH SHEET "A2.14" FOR PLANTER DRAINS 1 2
9 4
7 85
86 10. HOSE BIB FROM DOMESTIC LINE

FOR MAINTENANCE PURPOSE

BY PLUMBING
Landscape Architects

4. 1-1/2" BULKHEAD FITTING W/ GASKET

3. GRAVEL

2. FILTER FABRIC
KEY NOTES:

1. B2G FIBERGLASS PLANTER

6. PEDESTAL PAVER SYSTEM

5. 1/2" PVC IRRIGATION SUPPLY LINE

AVAILABLE FROM
0'-4"

7. 1/2" DRIPLINE

8. IRRIGATION SUPPLY LINE

ENLARGED

PER PLAN

PER PLAN
www.bulkreefsupply.com
0'-3"
3"

9. 1-1/2" DIA. SCH.40 PVC OVERFLOW PIPE
COLOR: TO MATCH BUILDING
FINISH: SMOOTH FINISH
CONTACT: AMBER URENA
EMAIL : [email protected]
2'-0"3'-4"2'-6"
0'-8"
9'-0"
9'-0"
0'-8"
7'-8"
0'-8"
3'-2"5'-8"
8'-11"
3'-0"
9'-0"
9'-0"
6'-0" 3'-0"

9. SMITH 2671T PLANTER DRAIN,
NOTE
SHALL BE NDS #1050

1. 10" ROUND GRATE
GREEN, AVAILABLE FROM THE NDS.

COMPANY (800) 726-1994

PER ARCHITECT PLAN

W/ WATERPROOFING

FILL WITH QUICK SETTING CEMENT

WITH WATER STOP OR EQUAL

OVER THE FLASHING COLLAR

11. STRUCTURAL SLAB

12. CAN OUT FOR DRAIN, SEAL TOP

3. WATERPROOFING &
WALL & 6" BEYOND EA. SIDE OF WALL

WATERPROOFING UNDER BLOCK
WATERPROOFING.

6. TOPPING SLAB, SLOPE TO DRAIN

8. CEMENTITIOUS CONTINUOUS

7. DRAINAGE MAT OVER

5. DRAIN GRAVEL

4. FILTER FABRIC
& PROTECTION BOARD
BOTTOM 3" OF PIPE

W/ PERFORATED

CLEAN OUT COVER

2. 8" DIA PVC PIPE

1. 10" ROUND GRATE

KEY NOTES

10. 6" X 8" X 16" CMU BLOCK

W/ STUCCO FINISH TO MATCH BUILDING
18"
2'-4"
0'-4"
0'-3"
1'-1"
0'-5"

WOOD DECKING

2. 2 X 3 ALUMINUM ANGLE FRAME

3. 1/4" x 6" GALV. ANGLE W/ 1/4"

TRIAGULAR WELDED GUSSET

1. 1" X 5.5" ( ACTUAL SIZE )

4. 1/2" DIA CONCRETE WEDGE

ANCHOR BOLTS

5. 2 X 4 PTDF BLOCKING AND FRAME

6. 1-1/2" X 6" GALV. STL ANGLE

KEYNOTES

7. 2 X 4 PTDF
2'-0" 2'-0" 2'-0"
PLAN
2'-4"

8. CONC. WALL
FILE NAME:

CERTIFICATION:

ISSUE OR REVISION NOTES:

DRAWING TITLE:

SHEET NO:

DRAWING SCALE:

SHEET SIZE:

PROJECT NO:

DATE STAMP:
24x36
2404 WILSHIRE BLVD. STE. 12D
LOS ANGELES, CA 90057
TEL: 1.213.568.3578
ARCHITECT: BRIAN WICKERSHAM
LIC: CA C-32742 / EXP: 07.31.21
AUX

ARCHITECTURE

NOT FOR CONSTRUCTION
As indicated
12/17/2020 11:20:24 AM
C:\Users\Laguna\Documents\184_Wende_DD_BIM360_laguna432BN.rvt NO. DATE DESCRIPTION
2669 Saturn Street
CA, 92821 F. 562-905-0880
[email protected]
T. 562-905-0800
www.sqlainc.com
BREA,
Landscape Architects
06/09/21 50% CONSTRUCTION DOCUMENTS
09/24/21 75% CD (PLAN CHECK SET)
1 B2G PREFAB PLANTER ON PEDESTAL PAVING (ADD ALT. ITEM) SCALE: 1"=1'-0"2 B2G PREFAB PLANTERs ON PEDESTAL PAVING SYSTEM (ADD ALT. ITEM) SCALE: 3/4"=1'-0"
4 B2G PREFAB CABANA (ADD ALT. ITEM)
SCALE: 1/2"=1'-0"

1. B2G 24"W X 24"H FIBERGLASS PLANTER

KEYNOTES

2. TILE TECH PEDESTAL PORCELAIN PAVING

4. TILE TECH WIND UPLIFT PAVER TRAYS

3. B2G 8"H. GREEN ROOF TRAY ON

TILE TECH TRAY SYSTEM
CONTACT : PAOLA RODRIGUEZ
EMAIL : [email protected]
COLOR: TERRAZZO COOL GRAY
COOL-ROOF™ CONCRETE SERIES

5. PERMALOC GEOEDGE ALUMINUM EDGING
CONTACT : PAOLA RODRIGUEZ
EMAIL : [email protected]
COLOR: CHARCOAL
FINISH: SMOOTH
3 PLANTER DRAIN (ADD ALT. ITEM)
SCALE: NTS

KEYNOTES

1. 4"X4" POWDER COATED ALUMINUM TUBE FRAME

2. 4"X4" POWDER COATED ALUMINUM TUBE POST

5. FINISH SURFACE / PEDESTAL PAVERS

6. TOP OF STRUCTURAL SLAB

4. 1/4" THK POWDER COATED ALUMINUM PLATE WELDED TO POST

3. 2"X2" POWDER COATED ALUMINUM LOUVER
NOTE: COLOR TO BE DECIDED

ALL CONNECTION BOLTS BY MANUFACTURER

6. 40" X 40" X 30" B2G SQUARO POT

7. BUILDING WALL

8. CONCRETE SLAB

PLAN VIEW

SOUTH ELEVATION WEST ELEVATION
LD-1

HARDSCAPE DETAILS
5 BUILT-IN BENCH
SCALE: NTS

4. 1-1/2" BULKHEAD FITTING W/ GASKET

3. GRAVEL

2. FILTER FABRIC
KEY NOTES:

1. B2G FIBERGLASS PLANTER

6. PEDESTAL PAVER SYSTEM

5. 1/2" PVC IRRIGATION SUPPLY LINE

AVAILABLE FROM
0'-4"

7. 1/2" DRIPLINE

8. IRRIGATION SUPPLY LINE

ENLARGED

PER PLAN

PER PLAN
www.bulkreefsupply.com
0'-3"
3"

9. 1-1/2" DIA. SCH.40 PVC OVERFLOW PIPE
COLOR: TO MATCH BUILDING
FINISH: SMOOTH FINISH
CONTACT: AMBER URENA
EMAIL : [email protected]
2'-0"3'-4"2'-6"
0'-8"
9'-0"
9'-0"
0'-8"
7'-8"
0'-8"
3'-2"5'-8"
8'-11"
3'-0"
9'-0"
9'-0"
6'-0" 3'-0"

9. SMITH 2671T PLANTER DRAIN,
NOTE
SHALL BE NDS #1050

1. 10" ROUND GRATE
GREEN, AVAILABLE FROM THE NDS.

COMPANY (800) 726-1994

PER ARCHITECT PLAN

W/ WATERPROOFING

FILL WITH QUICK SETTING CEMENT

WITH WATER STOP OR EQUAL

OVER THE FLASHING COLLAR

11. STRUCTURAL SLAB

12. CAN OUT FOR DRAIN, SEAL TOP

3. WATERPROOFING &
WALL & 6" BEYOND EA. SIDE OF WALL

WATERPROOFING UNDER BLOCK
WATERPROOFING.

6. TOPPING SLAB, SLOPE TO DRAIN

8. CEMENTITIOUS CONTINUOUS

7. DRAINAGE MAT OVER

5. DRAIN GRAVEL

4. FILTER FABRIC
& PROTECTION BOARD
BOTTOM 3" OF PIPE

W/ PERFORATED

CLEAN OUT COVER

2. 8" DIA PVC PIPE

1. 10" ROUND GRATE

KEY NOTES

10. 6" X 8" X 16" CMU BLOCK

W/ STUCCO FINISH TO MATCH BUILDING
18"
2'-4"
0'-4"
0'-3"
1'-1"
0'-5"

WOOD DECKING

2. 2 X 3 ALUMINUM ANGLE FRAME

3. 1/4" x 6" GALV. ANGLE W/ 1/4"

TRIAGULAR WELDED GUSSET

1. 1" X 5.5" ( ACTUAL SIZE )

4. 1/2" DIA CONCRETE WEDGE

ANCHOR BOLTS

5. 2 X 4 PTDF BLOCKING AND FRAME

6. 1-1/2" X 6" GALV. STL ANGLE

KEYNOTES

7. 2 X 4 PTDF
2'-0" 2'-0" 2'-0"
PLAN
2'-4"

8. CONC. WALL
FILE NAME:

CERTIFICATION:

ISSUE OR REVISION NOTES:

DRAWING TITLE:

SHEET NO:

DRAWING SCALE:

SHEET SIZE:

PROJECT NO:

DATE STAMP:
24x36
2404 WILSHIRE BLVD. STE. 12D
LOS ANGELES, CA 90057
TEL: 1.213.568.3578
ARCHITECT: BRIAN WICKERSHAM
LIC: CA C-32742 / EXP: 07.31.21
AUX

ARCHITECTURE

NOT FOR CONSTRUCTION
As indicated
12/17/2020 11:20:24 AM
C:\Users\Laguna\Documents\184_Wende_DD_BIM360_laguna432BN.rvt NO. DATE DESCRIPTION
2669 Saturn Street
CA, 92821 F. 562-905-0880
[email protected]
T. 562-905-0800
www.sqlainc.com
BREA,
Landscape Architects
06/09/21 50% CONSTRUCTION DOCUMENTS
09/24/21 75% CD (PLAN CHECK SET)
1 B2G PREFAB PLANTER ON PEDESTAL PAVING (ADD ALT. ITEM) SCALE: 1"=1'-0"2 B2G PREFAB PLANTERs ON PEDESTAL PAVING SYSTEM (ADD ALT. ITEM) SCALE: 3/4"=1'-0"
4 B2G PREFAB CABANA (ADD ALT. ITEM)
SCALE: 1/2"=1'-0"

1. B2G 24"W X 24"H FIBERGLASS PLANTER

KEYNOTES

2. TILE TECH PEDESTAL PORCELAIN PAVING

4. TILE TECH WIND UPLIFT PAVER TRAYS

3. B2G 8"H. GREEN ROOF TRAY ON

TILE TECH TRAY SYSTEM
CONTACT : PAOLA RODRIGUEZ
EMAIL : [email protected]
COLOR: TERRAZZO COOL GRAY
COOL-ROOF™ CONCRETE SERIES

5. PERMALOC GEOEDGE ALUMINUM EDGING
CONTACT : PAOLA RODRIGUEZ
EMAIL : [email protected]
COLOR: CHARCOAL
FINISH: SMOOTH
3 PLANTER DRAIN (ADD ALT. ITEM)
SCALE: NTS

KEYNOTES

1. 4"X4" POWDER COATED ALUMINUM TUBE FRAME

2. 4"X4" POWDER COATED ALUMINUM TUBE POST

5. FINISH SURFACE / PEDESTAL PAVERS

6. TOP OF STRUCTURAL SLAB

4. 1/4" THK POWDER COATED ALUMINUM PLATE WELDED TO POST

3. 2"X2" POWDER COATED ALUMINUM LOUVER
NOTE: COLOR TO BE DECIDED

ALL CONNECTION BOLTS BY MANUFACTURER

6. 40" X 40" X 30" B2G SQUARO POT

7. BUILDING WALL

8. CONCRETE SLAB

PLAN VIEW

SOUTH ELEVATION WEST ELEVATION
LD-1

HARDSCAPE DETAILS
5 BUILT-IN BENCH
SCALE: NTS
- ROOF DECK PLANPROPOSED HARDSCAPE

AUX ARCHITECTURE
2021.10.20
54 CULVER CITY COMPREHENSIVE PLAN
TREES
PLANTING LEGEND (ADD ALT. ITEMS)
SIZE & QUAN. WUCOLS

PHOENIX DACTYLIFERA

DATE PALM
MODERATE15FT. TRUNK HT./ 2 EA.

AGAVE ATTENUATA

FOXTAIL AGAVE
LOW5 GAL./ 15 EA.

MODERATE15 GAL./ 12 EA.

SHRUB & GROUND COVER
'SILVER DRAGON'

LIRIOPE SPICATA

VARIEGATED LILY TURF

STRELITZIA REGINAE

BIRD OF PARADISE
SIZE & QUAN. WUCOLS
5 GAL./ 6 EA.
1 GAL. @ 18" O.C./ 50 EA.
5 GAL. @ 24" O.C./ 31 EA.
1 GAL. @ 24" O.C./ 65 EA.

ANIGOZANTHOS FLAVIDUS

KANGAROO PAW
'BIG RED'

MUHLENBERGIA CAPILLARIS
'REGAL MIST'

PINK MUHLY

MODERATE

MODERATE

MODERATE

MODERATE

PODOCARPUS ELONGATUS
'MONMAL'

ICEE BLUE YELLOW WOOD

SENECIO MANDRALISCAE

KLEINIA
4" POT@12" O.C./ 142 EA. LOW
FILE NAME:

CERTIFICATION:

ISSUE OR REVISION NOTES:

DRAWING TITLE:

SHEET NO:

DRAWING SCALE:

SHEET SIZE:

PROJECT NO:

DATE STAMP:
24x36
2404 WILSHIRE BLVD. STE. 12D
LOS ANGELES, CA 90057
TEL: 1.213.568.3578
ARCHITECT: BRIAN WICKERSHAM
LIC: CA C-32742 / EXP: 07.31.21
AUX

ARCHITECTURE

NOT FOR CONSTRUCTION
As indicated
12/17/2020 11:20:24 AM
C:\Users\Laguna\Documents\184_Wende_DD_BIM360_laguna432BN.rvt NO. DATE DESCRIPTION
Signature
Renewal Date
Date
2-28-2023
06-09-21
"I HAVE COMPLIED WITH THE CRITERIA OF THE

ORDINANCE AND APPLIED THEM FOR THE EFFICIENT USE OF WATER IN THE LANDSCAPE DESIGN PLANS". 2669 Saturn Street
CA, 92821 F. 562-905-0880
[email protected]
T. 562-905-0800
www.sqlainc.com
BREA,
Landscape Architects
06/09/21 50% CONSTRUCTION DOCUMENTS
09/24/21 75% CD (PLAN CHECK SET)
1 PLANTING PLAN - FIRST FLOOR
SCALE: 1/8" = 1'-0"
0 4' 8' 16'
Scale: 1/8" = 1'-0"
LP-1

PLANTING PLAN
- FIRST FLOOR
N

LIRIOPE SPICATA
'SILVER DRAGON'

VARIEGATED LILY TURF

MUHLENBERGIA CAPILLARIS
'REGAL MIST'

PINK MUHLY

ANIGOZANTHOS FLAVIDUS
'BIG RED'

KANGAROO PAW

PHOENIX DACTYLIFERA

DATE PALM

PODOCARPUS ELONGATUS
'MONMAL'

ICEE BLUE YELLOW WOOD

AGAVE ATTENUATA

FOXTAIL AGAVE

AGAVE ATTENUATA

FOXTAIL AGAVE

SENECIO MANDRALISCAE

KLEINIA

SPLASH BLOCK

RIVER ROCKS
Landscape Architects
UP
DN

COMMUNITY OPEN SPACE
SITE STAIR 1
STAIR 2

VESTIBULE
(E)STAIR
(E) WENDE MUSEUM GARDEN
(E) PARKING
DN

TELESCOPING

SEATING
(59 SEATS)
STAGE

ELEVATOR
DN

96.11 F.S.

96.50 T.OW.

96.89 T.OW.

ENTRANCE GATE

PROPERTY LINE

PROPERTY LINE
(E) FENCE
ADA

SEATING
(5 SEATS)
(84 SEATS TOTAL)
(E) STATUE

96.04 96.11
DN

LANDING
0'-0" REAR-YARD SETBACK
0'-0" SIDE-YARD SETBACK
0'-0" SIDE-YARD SETBACK
0'-0" FRONT-YARD SETBACK

AIR-SPACE

ENCROACHMENT
(E) SIREN
SLOPED WALKWAY 2.0% MAX.

LANDING RAMP 8.3% MAX.

94.58 92.56

93.17 96.11

95.29 94.72
(E) GATE
MECHANICAL EQUIP.

SLOPED WALKWAY 2.0% MAX.

EC01
TREES

PLANTING LEGEND
SIZE & QUAN. WUCOLS

PHOENIX DACTYLIFERA

DATE PALM
MODERATE15FT. TRUNK HT./ 2 EA.

AGAVE ATTENUATA

FOXTAIL AGAVE
LOW5 GAL./ 13 EA.

MODERATE15 GAL./ 12 EA.

SHRUB & GROUND COVER
'SILVER DRAGON'

LIRIOPE SPICATA

VARIEGATED LILY TURF

STRELITZIA REGINAE

BIRD OF PARADISE
SIZE & QUAN. WUCOLS
5 GAL./ 6 EA.
1 GAL. @ 18" O.C./ 41 EA.
5 GAL. @ 24" O.C./ 35 EA.
1 GAL. @ 24" O.C./ 53 EA.

ANIGOZANTHOS FLAVIDUS

KANGAROO PAW
'BIG RED'

MUHLENBERGIA CAPILLARIS
'REGAL MIST'

PINK MUHLY

MODERATE

MODERATE

MODERATE

MODERATE

PODOCARPUS ELONGATUS
'MONMAL'

ICEE BLUE YELLOW WOOD

SENECIO MANDRALISCAE

KLEINIA
4" POT@12" O.C./ 107 EA. LOW
FILE NAME:

CERTIFICATION:
- PROJECT ADDRESS
10858 & 10876 CULVER BLVD.

CULVER CITY, CA 90230
- PROJECT OWNER
- SOILS ENGINEER
SUBSURFACE DESIGNS INC.
12848 FOOTHILL BLVD.

SYLMAR, CA 91342
T: 818-898-1595
- CIVIL ENGINEER
LC ENGINEERING GROUP, INC.
889 PIERCE CT., STE. 101
THOUSAND OAKS, CA 91360
T: 805-497-1244
- LANDSCAPE ARCHITECT

SQLA, INC
2669 SATURN ST
BREA, CA 92821
T: 562-905-0800
- STRUCTURAL ENGINEER

NOUS ENGINEERING
600 WILSHIRE BLVD. SUITE 760
LOS ANGELES, CA 90017
T: 213-627-6687
- MEP

ALFA TECH
510W 6TH STREET, SUITE #1105
LOS ANGELES, CA 90014
- LIGHTING & THEATER CONSULTANT

JOHN LEVY LIGHTING PRODUCTIONS, LLP
350 S FIGUEROA ST. #127
LOS ANGELES, CA 90071
T: 213-629-9949
- ACOUSTICAL CONSULTANT

NICK ANTONIO ACOUSTICS
4487 COLBATH AVE. #306
SHERMAN OAKS, CA 91423
T: 310-404-1833
- SECURITY CONSULTANT

SISTEMS INTEGRATION
606 S. HILL ST., SUITE #1009
LOS ANGELES, CA 90014
T: 213-623-5584
- SIGNAGE CONSULTANT

ROBERT FITCH DESIGN
1115 S ORANGE GROVE AVE. #1
LOS ANGELES, CA 90019
T: 323-424-3146
- SPECIFICATION CONSULTANT

CG-ASSOCIATES
2626 NAPLES AVE.

VENICE, CA 90291
T: 310-578-5773
ISSUE OR REVISION NOTES:

DRAWING TITLE:

SHEET NO:

DRAWING SCALE:

SHEET SIZE:

PROJECT NO:

DATE STAMP:
24x36
2404 WILSHIRE BLVD. STE. 12D
LOS ANGELES, CA 90057
TEL: 1.213.568.3578
ARCHITECT: BRIAN WICKERSHAM
LIC: CA C-32742 / EXP: 07.31.21
AUX

ARCHITECTURE

NOT FOR CONSTRUCTION
As indicated
12/17/2020 11:20:24 AM
C:\Users\Laguna\Documents\184_Wende_DD_BIM360_laguna432BN.rvt 22065

CREATIVE

COMMUNITY
CENTER
NO. DATE DESCRIPTION
T. 213-383-1788 (Studio)
2669 SATURN STREET
CA, 92821 F. [email protected]
T. 562-905-0800 (Main)
www.sqlainc.com
BREA,
Landscape Architects
Signature
Renewal Date
Date
2-28-2023
05-28-21
"I HAVE COMPLIED WITH THE CRITERIA OF THE

ORDINANCE AND APPLIED THEM FOR THE EFFICIENT USE OF WATER IN THE LANDSCAPE DESIGN PLANS".
1 PLANTING PLAN - FIRST FLOOR
SCALE: 1/8" = 1'-0"
0 4' 8' 16'
Scale: 1/8" = 1'-0"
LP-1

PLANTING PLAN
- FIRST FLOOR
NN

TRUE PROJECT

LIRIOPE SPICATA
'SILVER DRAGON'

VARIEGATED LILY TURF

MUHLENBERGIA CAPILLARIS
'REGAL MIST'

PINK MUHLY

ANIGOZANTHOS FLAVIDUS
'BIG RED'

KANGAROO PAW

PHOENIX DACTYLIFERA

DATE PALM

PODOCARPUS ELONGATUS
'MONMAL'

ICEE BLUE YELLOW WOOD

AGAVE ATTENUATA

FOXTAIL AGAVE

AGAVE ATTENUATA

FOXTAIL AGAVE

SENECIO MANDRALISCAE

KLEINIA
- GROUND LEVEL

GROUND COVER SHRUBS TREES

PROPOSED LANDSCAPE

AUX ARCHITECTURE
2021.10.20
55 CULVER CITY COMPREHENSIVE PLAN
Landscape Architects
UP
UP
DN
769 SF

CLASSROOM
201
230 SF

EDUCATION
/TUTORIAL
ROOM
202148 SF

STORAGE
203
STAIR 2

PLANTER

ELEVATOR

ROOF BELOW

AIR-SPACE

ENCROACHMENT

EXISTING BUILDING
BELOW
ROOF
SLOPES
DN
ROOF
SLOPES
DN
STAIR 1
S1
107.28 107.28
0'-0" REAR-YARD SETBACK
0'-0" SIDE-YARD SETBACK
0'-0" SIDE-YARD SETBACK
0'-0" FRONT-YARD SETBACK

SIDE-YARD

ENCROACHMENT

CORRIDOR
205

PLANTER
110.4% 110.4%

PLANTING LEGEND

SHRUB & GROUND COVER

CALANDRIANIA SPECTABILIS

ROCK PURSLANE

SENECIO MANDRALISCAE

KLEINIA

ALOE STRIATA

CORAL ALOE
SIZE & QUAN. WUCOLS
1 GAL.@24" O.C./ 32 EA. LOW
4" POT@12" O.C./ 122 EA. LOW
1 GAL.@12" O.C. / 106 EA. LOW

KALANCHOE LUCIAE

PADDLE PLANT
1 GAL.@18" O.C. / 48 EA. LOW

STRING OF BANANAS
4" POT @ 12" O.C./ 57 EA. LOWSENECIO RADICANS
FILE NAME:

CERTIFICATION:
- PROJECT ADDRESS
10858 & 10876 CULVER BLVD.

CULVER CITY, CA 90230
- PROJECT OWNER
- SOILS ENGINEER
SUBSURFACE DESIGNS INC.
12848 FOOTHILL BLVD.

SYLMAR, CA 91342
T: 818-898-1595
- CIVIL ENGINEER
LC ENGINEERING GROUP, INC.
889 PIERCE CT., STE. 101
THOUSAND OAKS, CA 91360
T: 805-497-1244
- LANDSCAPE ARCHITECT

SQLA, INC
2669 SATURN ST
BREA, CA 92821
T: 562-905-0800
- STRUCTURAL ENGINEER

NOUS ENGINEERING
600 WILSHIRE BLVD. SUITE 760
LOS ANGELES, CA 90017
T: 213-627-6687
- MEP

ALFA TECH
510W 6TH STREET, SUITE #1105
LOS ANGELES, CA 90014
- LIGHTING & THEATER CONSULTANT

JOHN LEVY LIGHTING PRODUCTIONS, LLP
350 S FIGUEROA ST. #127
LOS ANGELES, CA 90071
T: 213-629-9949
- ACOUSTICAL CONSULTANT

NICK ANTONIO ACOUSTICS
4487 COLBATH AVE. #306
SHERMAN OAKS, CA 91423
T: 310-404-1833
- SECURITY CONSULTANT

SISTEMS INTEGRATION
606 S. HILL ST., SUITE #1009
LOS ANGELES, CA 90014
T: 213-623-5584
- SIGNAGE CONSULTANT

ROBERT FITCH DESIGN
1115 S ORANGE GROVE AVE. #1
LOS ANGELES, CA 90019
T: 323-424-3146
- SPECIFICATION CONSULTANT

CG-ASSOCIATES
2626 NAPLES AVE.

VENICE, CA 90291
T: 310-578-5773
ISSUE OR REVISION NOTES:

DRAWING TITLE:

SHEET NO:

DRAWING SCALE:

SHEET SIZE:

PROJECT NO:

DATE STAMP:
24x36
2404 WILSHIRE BLVD. STE. 12D
LOS ANGELES, CA 90057
TEL: 1.213.568.3578
ARCHITECT: BRIAN WICKERSHAM
LIC: CA C-32742 / EXP: 07.31.21
AUX

ARCHITECTURE

NOT FOR CONSTRUCTION
As indicated
12/17/2020 11:20:24 AM
C:\Users\Laguna\Documents\184_Wende_DD_BIM360_laguna432BN.rvt 22065

CREATIVE

COMMUNITY
CENTER
NO. DATE DESCRIPTION
T. 213-383-1788 (Studio)
2669 SATURN STREET
CA, 92821 F. [email protected]
T. 562-905-0800 (Main)
www.sqlainc.com
BREA,
Landscape Architects
Signature
Renewal Date
Date
2-28-2023
05-28-21
"I HAVE COMPLIED WITH THE CRITERIA OF THE

ORDINANCE AND APPLIED THEM FOR THE EFFICIENT USE OF WATER IN THE LANDSCAPE DESIGN PLANS".
1 PLANTING PLAN - SECOND FLOOR
SCALE: 1/8" = 1'-0"
0 4' 8' 16'
Scale: 1/8" = 1'-0"
LP-2

PLANTING PLAN
- SECOND FLOOR
NN

TRUE PROJECT

SENECIO RADICANS

STRING OF BANANAS

KALANCHOE LUCIAE

PADDLE PLANT

ALOE STRIATA

SENECIO MANDRALISCAE

KLEINIA

CALANDRIANIA SPECTABILIS

ROCK PURSLANE
PLANTING LEGEND (ADD ALT. ITEMS)

SHRUB & GROUND COVER

CALANDRIANIA SPECTABILIS

ROCK PURSLANE

SENECIO MANDRALISCAE

KLEINIA

ALOE STRIATA

CORAL ALOE
SIZE & QUAN. WUCOLS
1 GAL.@24" O.C./ 28 EA. LOW
4" POT@12" O.C./ 122 EA. LOW
1 GAL.@12" O.C. / 106 EA. LOW

KALANCHOE LUCIAE

PADDLE PLANT
1 GAL.@18" O.C. / 47 EA. LOW

STRING OF BANANAS
4" POT @ 12" O.C./ 56 EA. LOWSENECIO RADICANS
FILE NAME:

CERTIFICATION:

ISSUE OR REVISION NOTES:

DRAWING TITLE:

SHEET NO:

DRAWING SCALE:

SHEET SIZE:

PROJECT NO:

DATE STAMP:
24x36
2404 WILSHIRE BLVD. STE. 12D
LOS ANGELES, CA 90057
TEL: 1.213.568.3578
ARCHITECT: BRIAN WICKERSHAM
LIC: CA C-32742 / EXP: 07.31.21
AUX

ARCHITECTURE

NOT FOR CONSTRUCTION
As indicated
12/17/2020 11:20:24 AM
C:\Users\Laguna\Documents\184_Wende_DD_BIM360_laguna432BN.rvt NO. DATE DESCRIPTION
Signature
Renewal Date
Date
2-28-2023
06-09-21
"I HAVE COMPLIED WITH THE CRITERIA OF THE

ORDINANCE AND APPLIED THEM FOR THE EFFICIENT USE OF WATER IN THE LANDSCAPE DESIGN PLANS". 2669 Saturn Street
CA, 92821 F. 562-905-0880
[email protected]
T. 562-905-0800
www.sqlainc.com
BREA,
Landscape Architects
06/09/21 50% CONSTRUCTION DOCUMENTS
09/24/21 75% CD (PLAN CHECK SET)
1 PLANTING PLAN - SECOND FLOOR
SCALE: 1/8" = 1'-0"
0 4' 8' 16'
Scale: 1/8" = 1'-0"
LP-2

PLANTING PLAN
- SECOND FLOOR
N

SENECIO RADICANS

STRING OF BANANAS

KALANCHOE LUCIAE

PADDLE PLANT

ALOE STRIATASENECIO MANDRALISCAE

KLEINIA

CALANDRIANIA SPECTABILIS

ROCK PURSLANE

SPLASH BLOCK

RIVER ROCKS

SPLASH BLOCK

RIVER ROCKS
- SECOND FLOOR LEVEL

GROUND COVER SHRUBS

PROPOSED LANDSCAPE

AUX ARCHITECTURE
2021.10.20
56 CULVER CITY COMPREHENSIVE PLAN
Landscape Architects
DN UP
DN
60 SF

RESTROOM
304

STORAGE
303
259 SF
OFFICE
302
771 SF

EXHIBITION
ROOM
301

PLANTER
STAIR 2

ELEVATOR

AIR-SPACE

ENCROACHMENT

EXISTING BUILDING
BELOW
ROOF

SLOPES DN
ROOF

SLOPES DN
110.4%110.4%
STAIR 1
S1
0'-0" REAR-YARD SETBACK
0'-0" SIDE-YARD SETBACK
0'-0" SIDE-YARD SETBACK
0'-0" FRONT-YARD SETBACK

SIDE-YARD

ENCROACHMENT

CORRIDOR
305

PLANTING LEGEND

SHRUB & GROUND COVER

CALANDRIANIA SPECTABILIS

ROCK PURSLANE

SENECIO MANDRALISCAE

KLEINIA

ALOE STRIATA

CORAL ALOE
SIZE & QUAN. WUCOLS
1 GAL.@24" O.C./ 22 EA. LOW
4" POT@12" O.C./ 55 EA. LOW
1 GAL.@12" O.C. / 76 EA. LOW

KALANCHOE LUCIAE

PADDLE PLANT
1 GAL.@18" O.C. / 36 EA. LOW

STRING OF BANANAS
4" POT @ 12" O.C./ 57 EA. LOWSENECIO RADICANS
FILE NAME:

CERTIFICATION:
- PROJECT ADDRESS
10858 & 10876 CULVER BLVD.

CULVER CITY, CA 90230
- PROJECT OWNER
- SOILS ENGINEER
SUBSURFACE DESIGNS INC.
12848 FOOTHILL BLVD.

SYLMAR, CA 91342
T: 818-898-1595
- CIVIL ENGINEER
LC ENGINEERING GROUP, INC.
889 PIERCE CT., STE. 101
THOUSAND OAKS, CA 91360
T: 805-497-1244
- LANDSCAPE ARCHITECT

SQLA, INC
2669 SATURN ST
BREA, CA 92821
T: 562-905-0800
- STRUCTURAL ENGINEER

NOUS ENGINEERING
600 WILSHIRE BLVD. SUITE 760
LOS ANGELES, CA 90017
T: 213-627-6687
- MEP

ALFA TECH
510W 6TH STREET, SUITE #1105
LOS ANGELES, CA 90014
- LIGHTING & THEATER CONSULTANT

JOHN LEVY LIGHTING PRODUCTIONS, LLP
350 S FIGUEROA ST. #127
LOS ANGELES, CA 90071
T: 213-629-9949
- ACOUSTICAL CONSULTANT

NICK ANTONIO ACOUSTICS
4487 COLBATH AVE. #306
SHERMAN OAKS, CA 91423
T: 310-404-1833
- SECURITY CONSULTANT

SISTEMS INTEGRATION
606 S. HILL ST., SUITE #1009
LOS ANGELES, CA 90014
T: 213-623-5584
- SIGNAGE CONSULTANT

ROBERT FITCH DESIGN
1115 S ORANGE GROVE AVE. #1
LOS ANGELES, CA 90019
T: 323-424-3146
- SPECIFICATION CONSULTANT

CG-ASSOCIATES
2626 NAPLES AVE.

VENICE, CA 90291
T: 310-578-5773
ISSUE OR REVISION NOTES:

DRAWING TITLE:

SHEET NO:

DRAWING SCALE:

SHEET SIZE:

PROJECT NO:

DATE STAMP:
24x36
2404 WILSHIRE BLVD. STE. 12D
LOS ANGELES, CA 90057
TEL: 1.213.568.3578
ARCHITECT: BRIAN WICKERSHAM
LIC: CA C-32742 / EXP: 07.31.21
AUX

ARCHITECTURE

NOT FOR CONSTRUCTION
As indicated
12/17/2020 11:20:24 AM
C:\Users\Laguna\Documents\184_Wende_DD_BIM360_laguna432BN.rvt 22065

CREATIVE

COMMUNITY
CENTER
NO. DATE DESCRIPTION
T. 213-383-1788 (Studio)
2669 SATURN STREET
CA, 92821 F. [email protected]
T. 562-905-0800 (Main)
www.sqlainc.com
BREA,
Landscape Architects
Signature
Renewal Date
Date
2-28-2023
05-28-21
"I HAVE COMPLIED WITH THE CRITERIA OF THE

ORDINANCE AND APPLIED THEM FOR THE EFFICIENT USE OF WATER IN THE LANDSCAPE DESIGN PLANS".
1 PLANTING PLAN - THIRD FLOOR
SCALE: 1/8" = 1'-0"
0 4' 8' 16'
Scale: 1/8" = 1'-0"
LP-3

PLANTING PLAN
- THIRD FLOOR
NN

TRUE PROJECT

SENECIO RADICANS

STRING OF BANANAS

KALANCHOE LUCIAE

PADDLE PLANT

ALOE STRIATA

SENECIO MANDRALISCAE

KLEINIA

CALANDRIANIA SPECTABILIS

ROCK PURSLANE
PLANTING LEGEND (ADD ALT. ITEMS)

SHRUB & GROUND COVER

CALANDRIANIA SPECTABILIS

ROCK PURSLANE

SENECIO MANDRALISCAE

KLEINIA

ALOE STRIATA

CORAL ALOE
SIZE & QUAN. WUCOLS
1 GAL.@24" O.C./ 22 EA. LOW
4" POT@12" O.C./ 55 EA. LOW
1 GAL.@12" O.C. / 76 EA. LOW

KALANCHOE LUCIAE

PADDLE PLANT
1 GAL.@18" O.C. / 36 EA. LOW

STRING OF BANANAS
4" POT @ 12" O.C./ 57 EA. LOWSENECIO RADICANS
FILE NAME:

CERTIFICATION:

ISSUE OR REVISION NOTES:

DRAWING TITLE:

SHEET NO:

DRAWING SCALE:

SHEET SIZE:

PROJECT NO:

DATE STAMP:
24x36
2404 WILSHIRE BLVD. STE. 12D
LOS ANGELES, CA 90057
TEL: 1.213.568.3578
ARCHITECT: BRIAN WICKERSHAM
LIC: CA C-32742 / EXP: 07.31.21
AUX

ARCHITECTURE

NOT FOR CONSTRUCTION
As indicated
12/17/2020 11:20:24 AM
C:\Users\Laguna\Documents\184_Wende_DD_BIM360_laguna432BN.rvt NO. DATE DESCRIPTION
Signature
Renewal Date
Date
2-28-2023
06-09-21
"I HAVE COMPLIED WITH THE CRITERIA OF THE

ORDINANCE AND APPLIED THEM FOR THE EFFICIENT USE OF WATER IN THE LANDSCAPE DESIGN PLANS". 2669 Saturn Street
CA, 92821 F. 562-905-0880
[email protected]
T. 562-905-0800
www.sqlainc.com
BREA,
Landscape Architects
06/09/21 50% CONSTRUCTION DOCUMENTS
09/24/21 75% CD (PLAN CHECK SET)
1 PLANTING PLAN - THIRD FLOOR
SCALE: 1/8" = 1'-0"
0 4' 8' 16'
Scale: 1/8" = 1'-0"
LP-3

PLANTING PLAN
- THIRD FLOOR
N

SENECIO RADICANS

STRING OF BANANAS

KALANCHOE LUCIAE

PADDLE PLANT

ALOE STRIATASENECIO MANDRALISCAE

KLEINIA

CALANDRIANIA SPECTABILIS

ROCK PURSLANE

SPLASH BLOCK

RIVER ROCKS

SPLASH BLOCK

RIVER ROCKS
- THIRD FLOOR LEVEL

GROUND COVER SHRUBS

PROPOSED LANDSCAPE

AUX ARCHITECTURE
2021.10.20
57 CULVER CITY COMPREHENSIVE PLAN
Landscape Architects
DN STAIR 2
110.4% 110.4%
ROOF
SLOPES
DN
ROOF
SLOPES
DN

ELEVATOR

AIR-SPACE

ENCROACHMENT
ROOF
SLOPES
DN
0'-0" REAR-YARD SETBACK
0'-0" SIDE-YARD SETBACK
0'-0" SIDE-YARD SETBACK
0'-0" FRONT-YARD SETBACK
54 SF
ELEV. MACHINE
ROOM
402

UTILITY
403

2.3%

3.2%

4.2%

SHRUB & GROUND COVER

CALANDRIANIA SPECTABILIS

ROCK PURSLANE

SENECIO MANDRALISCAE

KLEINIA

ALOE STRIATA

CORAL ALOE
SIZE & QUAN. WUCOLS
1 GAL.@24" O.C./ 31 EA. LOW
4" POT@12" O.C./ 111 EA. LOW
1 GAL.@12" O.C. / 122 EA. LOW

KALANCHOE LUCIAE

PADDLE PLANT
1 GAL.@18" O.C. / 64 EA. LOW
5 GAL.@24" O.C./ 16 EA. LOW
1 GAL.@18" O.C./ 139 EA. LOWDIANELLA REVOLUTA
'ALLYN-CITATION'

COOLVISTA DIANELLA
24" BOX / 2 EA.

SIZE & QUAN. TREES WUCOLS

CERCIDIUM HYBRID
'DESERT MUSEUM'

DESERT MUSEUM PALO VERDE
LOW

AGAVE ATTENUATA
'RED MARGIN'

AGAVE RED MARGIN
FILE NAME:

CERTIFICATION:
- PROJECT ADDRESS
10858 & 10876 CULVER BLVD.

CULVER CITY, CA 90230
- PROJECT OWNER
- SOILS ENGINEER
SUBSURFACE DESIGNS INC.
12848 FOOTHILL BLVD.

SYLMAR, CA 91342
T: 818-898-1595
- CIVIL ENGINEER
LC ENGINEERING GROUP, INC.
889 PIERCE CT., STE. 101
THOUSAND OAKS, CA 91360
T: 805-497-1244
- LANDSCAPE ARCHITECT

SQLA, INC
2669 SATURN ST
BREA, CA 92821
T: 562-905-0800
- STRUCTURAL ENGINEER

NOUS ENGINEERING
600 WILSHIRE BLVD. SUITE 760
LOS ANGELES, CA 90017
T: 213-627-6687
- MEP

ALFA TECH
510W 6TH STREET, SUITE #1105
LOS ANGELES, CA 90014
- LIGHTING & THEATER CONSULTANT

JOHN LEVY LIGHTING PRODUCTIONS, LLP
350 S FIGUEROA ST. #127
LOS ANGELES, CA 90071
T: 213-629-9949
- ACOUSTICAL CONSULTANT

NICK ANTONIO ACOUSTICS
4487 COLBATH AVE. #306
SHERMAN OAKS, CA 91423
T: 310-404-1833
- SECURITY CONSULTANT

SISTEMS INTEGRATION
606 S. HILL ST., SUITE #1009
LOS ANGELES, CA 90014
T: 213-623-5584
- SIGNAGE CONSULTANT

ROBERT FITCH DESIGN
1115 S ORANGE GROVE AVE. #1
LOS ANGELES, CA 90019
T: 323-424-3146
- SPECIFICATION CONSULTANT

CG-ASSOCIATES
2626 NAPLES AVE.

VENICE, CA 90291
T: 310-578-5773
ISSUE OR REVISION NOTES:

DRAWING TITLE:

SHEET NO:

DRAWING SCALE:

SHEET SIZE:

PROJECT NO:

DATE STAMP:
24x36
2404 WILSHIRE BLVD. STE. 12D
LOS ANGELES, CA 90057
TEL: 1.213.568.3578
ARCHITECT: BRIAN WICKERSHAM
LIC: CA C-32742 / EXP: 07.31.21
AUX

ARCHITECTURE

NOT FOR CONSTRUCTION
As indicated
12/17/2020 11:20:24 AM
C:\Users\Laguna\Documents\184_Wende_DD_BIM360_laguna432BN.rvt 22065

CREATIVE

COMMUNITY
CENTER
NO. DATE DESCRIPTION
T. 213-383-1788 (Studio)
2669 SATURN STREET
CA, 92821 F. [email protected]
T. 562-905-0800 (Main)
www.sqlainc.com
BREA,
Landscape Architects
Signature
Renewal Date
Date
2-28-2023
05-28-21
"I HAVE COMPLIED WITH THE CRITERIA OF THE

ORDINANCE AND APPLIED THEM FOR THE EFFICIENT USE OF WATER IN THE LANDSCAPE DESIGN PLANS".
1 PLANTING PLAN - ROOF LEVEL
SCALE: 1/8" = 1'-0"
0 4' 8' 16'
Scale: 1/8" = 1'-0"
LP-4

PLANTING PLAN
- ROOF LEVEL

AGAVE ATTENUATA
'RED MARGIN'

AGAVE RED MARGIN
NN

TRUE PROJECT

KALANCHOE LUCIAE

PADDLE PLANT

ALOE STRIATA

SENECIO MANDRALISCAE

KLEINIA

CALANDRIANIA SPECTABILIS

ROCK PURSLANE

DIANELLA REVOLUTA
'ALLYN-CITATION'

COOLVISTA DIANELLA

CERCIDIUM HYBRID
'DESERT MUSEUM'

DESERT MUSEUM PALO VERDE

SHRUB & GROUND COVER

CALANDRIANIA SPECTABILIS

ROCK PURSLANE

SENECIO MANDRALISCAE

KLEINIA

ALOE STRIATA

CORAL ALOE
SIZE & QUAN. WUCOLS
1 GAL.@24" O.C./ 27 EA. LOW
4" POT@12" O.C./ 109 EA. LOW
1 GAL.@12" O.C. / 119 EA. LOW

KALANCHOE LUCIAE

PADDLE PLANT
1 GAL.@18" O.C. / 57 EA. LOW
5 GAL.@24" O.C./ 16 EA. LOW
1 GAL.@18" O.C./ 134 EA. LOWDIANELLA REVOLUTA
'ALLYN-CITATION'

COOLVISTA DIANELLA
24" BOX / 2 EA.

SIZE & QUAN. TREES
PLANTING LEGEND (ADD ALT. ITEMS)
WUCOLS

CERCIDIUM HYBRID
'DESERT MUSEUM'

DESERT MUSEUM PALO VERDE
LOW

AGAVE ATTENUATA
'RED MARGIN'

AGAVE RED MARGIN
FILE NAME:

CERTIFICATION:

ISSUE OR REVISION NOTES:

DRAWING TITLE:

SHEET NO:

DRAWING SCALE:

SHEET SIZE:

PROJECT NO:

DATE STAMP:
24x36
2404 WILSHIRE BLVD. STE. 12D
LOS ANGELES, CA 90057
TEL: 1.213.568.3578
ARCHITECT: BRIAN WICKERSHAM
LIC: CA C-32742 / EXP: 07.31.21
AUX

ARCHITECTURE

NOT FOR CONSTRUCTION
As indicated
12/17/2020 11:20:24 AM
C:\Users\Laguna\Documents\184_Wende_DD_BIM360_laguna432BN.rvt NO. DATE DESCRIPTION
Signature
Renewal Date
Date
2-28-2023
06-09-21
"I HAVE COMPLIED WITH THE CRITERIA OF THE

ORDINANCE AND APPLIED THEM FOR THE EFFICIENT USE OF WATER IN THE LANDSCAPE DESIGN PLANS". 2669 Saturn Street
CA, 92821 F. 562-905-0880
[email protected]
T. 562-905-0800
www.sqlainc.com
BREA,
Landscape Architects
06/09/21 50% CONSTRUCTION DOCUMENTS
09/24/21 75% CD (PLAN CHECK SET)
1 PLANTING PLAN - ROOF LEVEL
SCALE: 1/8" = 1'-0"
0 4' 8' 16'
Scale: 1/8" = 1'-0"
LP-4

PLANTING PLAN
- ROOF LEVEL

AGAVE ATTENUATA
'RED MARGIN'

AGAVE RED MARGIN
N

KALANCHOE LUCIAE

PADDLE PLANT

ALOE STRIATASENECIO MANDRALISCAE

KLEINIA

CALANDRIANIA SPECTABILIS

ROCK PURSLANE

DIANELLA REVOLUTA
'ALLYN-CITATION'

COOLVISTA DIANELLA

CERCIDIUM HYBRID
'DESERT MUSEUM'

DESERT MUSEUM PALO VERDE
ALT. DESIGN AREA
- ROOF DECK LEVEL

GROUND COVER SHRUBS TREES

PROPOSED LANDSCAPE

AUX ARCHITECTURE
2021.10.20
58 CULVER CITY COMPREHENSIVE PLAN
Current signage was approved through a Master Sign Program (MSP) that will be amended or replaced in order to accommodate signage for the proposed Creative Community Center.

Existing signage includes three wall signs along the northern frontage (totaling 64.2 square feet.), two wall signs along the eastern frontage (totaling 57.8 square feet.), and three monument signs adjacent to the parking lot (totaling 77.8 square. feet.). One 37.4 square foot sign faces west within the Museum’s existing garden. The existing signs comprise 237.2 square feet.

Proposed signs will match the existing sign types. Proposed locations include the North face of the Creative Community Center, which is seen from Culver Blvd., providing an opportunity for building identification and branding. The Wende logo has been modified to distinguish the community center from the museum while informing the visitor it’s part of a new Wende venue. Signs are currently placed where they can be seen from the street, on the small soffit, leaving a blank wall on which to place the iconic Wende mark. Pin mounted letter type is used because it gives dimension and increases visibility, while the size was determined after studying the scale of the building.

The copy and logo were made as large as possible for adequate visibility, while respecting the architecture and the scale of the building and surrounding space. Both signs will be legible from Culver Blvd. Lighting will be proposed to accommodate building conditions and maximize visibility and aesthetic quality, although not all signs will be illuminated. Sign illumination will include halo lighting, consistent with the other signs on the property. Soffit lettering will be lit from the garden, which is also consistent with the present MSP.

On the east side, the lettering will be separated from the Wende mark much like layout currently on the north face. The copy will be flush right to tie into the logo sign.

The community center building frontage is 77’-10” which when calculated at the allowable area rate of

1.5 square feet, per the CCMC yields a total of 115.5 sq. ft.. Per the CCMC, there is also a maximum cap of 200 square feet per frontage. The proposed signage would be a total of 45.39 square feet and the existing is 64.2 sq. ft., along the northern frontage, well below the maximum allowable. This adequately identifies the building function and its association with the Wende Museum.

SIGNAGE

AUX ARCHITECTURE
2021.10.20
59 CULVER CITY COMPREHENSIVE PLAN

EXISTING SIGNAGE

AUX ARCHITECTURE
2021.10.20
60 CULVER CITY COMPREHENSIVE PLAN
1/4” = 1’
13’6” BY 9’4”

DISPLAY WALL
28”10” BY 1’ 6”

DISPLAY SOFFIT

TYPE WILL CENTER

CCC SIGN

LETTERING IS
24’3”LONG.

7.5” PIN MOUNT

LETTERS

FITCH DESIGN

NORTH ELEVATION

NORTH ELEVATION RENDERINGS
1: EXTERIOR BUILDING WALL SIGN ELEVATION DRAWINGS 2ND FLOOR 1-1 - ELEVATION SHEET 1 1 12’5”
17’8”

NOT TO SCALE
5’3”

SIGN HEIGHT SPEC

PROPOSED SIGNAGE

AUX ARCHITECTURE
2021.10.20
61 CULVER CITY COMPREHENSIVE PLAN
1/4” = 1’
DISPLAY WALL IS 11’3” WIDE
& 9’4 “ TALL

FITCH DESIGN

EAST ELEVATION

EAST ELEVATION RENDERINGS
3: EXTERIOR BUILDING SIGN ELEVATION DRAWINGS GROUND FLOOR 2-1 - SIGNAGE ELEVATION SHEET 1 6.” LETTERS

SIGN LETTERING IS
9’4” X 1’5“= 13.25 SQ FT
(MEASURED AS A RECTANGLE)_

SUBTRACTING THE BLANK

SPACE TO THE LEFT WOULD
COME TO 8.25 SQ FT TOTAL”
RETURN WALL TO RIGHT OF ENTRYWAY IS 4’8” BY 8’8”
LOGO WITH TYPE 2’5” BY 2’2” = 5.25 SQ FT- LETTERING 4 ” 6’11”
5’8”

PROPOSED SIGNAGE

AUX ARCHITECTURE
2021.10.20
62 CULVER CITY COMPREHENSIVE PLAN

PROPOSED LIGHTING
Exterior lighting
At night, the Creative Community Center will be visually linked by extending the existing landscape lighting palate to encompass both buildings and the intervening space.

The architecture of the Creative Community Center will be enhanced by selectively illuminating elements such as the grillwork, entry signage, and planters. Thus the new lighting adds components to the Culver City arts corridor night scape.

To increase harmony with the adjacent residences, care will be taken with the location, aiming and type of illumination to ensure there is no light trespass upon the neighbors while maintaining safety and security.

Exterior lighting fixtures at trees and facade features are adjustable led lights, they will be aimed to trees and feature walls without spill lights outside the boundaries of site. Other light fixtures are directed downward to provide area lighting within the site. Outdoor lighting will comply with Section 17.300.040 of Culver City Municipal Code, including code minimum lighting at ingress/egress doors along the alley. Ceilings along walkways will be illuminated.

AUX ARCHITECTURE
2021.10.20
63 CULVER CITY COMPREHENSIVE PLAN
J
J J

JJ J JJ
AD
AD
S-7
S-6
J
J

VIEW RANGE

PRIMARY RANGE
TOP: ASSOC LEVEL (LEVEL 1) OFFSET:7'-6"
CUT PLANE: ASSOC LEVEL (LEVEL 1) OFFSET:4'-0"
BOTTOM: ASSOC LEVEL (LEVEL 1) OFFSET:-1'-6"

VIEW DEPTH
LEVEL: ASSOC LEVEL (LEVEL 1) OFFSET:-1'-6"
LS-5
EL104-S
LS-5
EL104-S
LS-5
EL104-S
LS-5
EL104-S

LCS-TS WALL MOUNTED CRESTRON

TOUCH SCREEN FOR BOTH THEATER

HOUSE LIGHTING AND THEATER AV

SYSTEM INTERFACE REFER TO AV
SYSTEM PLAN.

ST-3
EL106
LS-1
EL104
LS-1
EL104
LS-1
EL104
LS-1
EL104
LS-1
EL104
LS-1
EL104
LS-1
EL104
LS-1
EL104
S-7
L104
S-7
L104
LB-1
L113
LB-1
L113
LB-1
L113
LB-1
L113
LB-1
L113
3 3
1 1
A A
B B
C C
D D
4 4
5 5
FF
EE

4.8 4.8
6 6
2 2

1.9 1.9

3.1 3.1
C.9 C.9
D.9D.9
D.1D.1
LS-8
J-BOXST-3
EL106

AVLC-TS AVLC-T

LCS-T WALL MOUNTED CRESTRON

TOUCH SCREEN FOR BOTH THEATER

HOUSE LIGHTING AND THEATER AV

SYSTEM INTERFACE REFER TO AV
SYSTEM PLAN.

FILE NAME:

CERTIFICATION:
- PROJECT ADDRESS
10858 & 10876 CULVER BLVD.

CULVER CITY, CA 90230
- PROJECT OWNER
- SOILS ENGINEER
SUBSURFACE DESIGNS INC.
12848 FOOTHILL BLVD.

SYLMAR, CA 91342
T: 818-898-1595
- CIVIL ENGINEER
LC ENGINEERING GROUP, INC.
889 PIERCE CT., STE. 101
THOUSAND OAKS, CA 91360
T: 805-497-1244
- LANDSCAPE ARCHITECT

SQLA, INC
2669 SATURN ST
BREA, CA 92821
T: 562-905-0800
- STRUCTURAL ENGINEER

NOUS ENGINEERING
600 WILSHIRE BLVD. SUITE 760
LOS ANGELES, CA 90017
T: 213-627-6687
- MEP

ALFA TECH
510W 6TH STREET, SUITE #1105
LOS ANGELES, CA 90014
- LIGHTING & THEATER CONSULTANT

JOHN LEVY LIGHTING PRODUCTIONS, JLLP
350 S FIGUEROA ST. #127
LOS ANGELES, CA 90071
T: 213-629-9949
- ACOUSTICAL CONSULTANT

NICK ANTONIO ACOUSTICS
4487 COLBATH AVE. #306
SHERMAN OAKS, CA 91423
T: 310-404-1833
- SECURITY CONSULTANT

SISTEMS INTEGRATION
606 S. HILL ST., SUITE #1009
LOS ANGELES, CA 90014
T: 213-623-5584
- SIGNAGE CONSULTANT

ROBERT FITCH DESIGN
1115 S ORANGE GROVE AVE. #1
LOS ANGELES, CA 90019
T: 323-424-3146
- SPECIFICATION CONSULTANT

CG-ASSOCIATES
2626 NAPLES AVE.

VENICE, CA 90291
T: 310-578-5773
ISSUE OR REVISION NOTES:

DRAWING TITLE:

SHEET NO:

DRAWING SCALE:

SHEET SIZE:

PROJECT NO:

DATE STAMP:
24x36
2404 WILSHIRE BLVD. STE. 12D
LOS ANGELES, CA 90057
TEL: 1.213.568.3578
ARCHITECT: BRIAN WICKERSHAM
LIC: CA C-32742 / EXP: 07.31.21
AUX

ARCHITECTURE

NOT FOR CONSTRUCTION
1/8" = 1'-0"
9/22/2021 4:46:13 PM
BIM 360://Creative Community Center/JLLP_Lighting_Wende CCC_R20.rvt SL-2.11

SPECIALTY LIGHTING -
FLOOR PLAN - LEVEL 1
184

CREATIVE

COMMUNITY
CENTER
1/8" = 1'-0"SL-2.11
1 SPECIALTY LIGHTING - FLOOR PLAN - LEVEL 1 THESE DESIGN DRAWINGS REPRESENT VISUAL CONCEPTS AND SUGGESTIONS ONLY. JLLP INC. IS NOT A LICENSED ENGINEER OR

ARCHITECT OR OTHERWISE QUALIFIED TO DETERMINE WHETHER THE

DESIGN MEETS APPLICABLE STRUCTURAL AND SAFETY STANDARDS OR BUILDING CODE REQUIREMENTS. ACCORDINGLY JLLP DOES NOT ASSUME

RESPONSIBILITY FOR THE STRUCTURAL INTEGRITY OF OR THE BUILDING OR

SAFETY CODE COMPLIANCE OF THE DESIGN OR FOR THE CONSTRUCTION,

RIGGING, HANDLING OR THE USE OF THE ARCHITECTURAL ELEMENTS AND EQUIPMENT DEPICTED OR REQUIRED IN CONNECTION WITH SUCH DESIGN. 1 L1................LIGHT FIXTURE TYPE / INSTANCE QUANTITY A-1..............LIGHTING CONTROL ZONE(WHEN APPLICABLE TO A LIGHTING

CONTROL SYSTEM)
.................................BEAM ANGLES................ (4)0

LIGHT FIXTURE ANNOTATION KEY
....................LIGHT FIXTURE SYMBOL (VARIES)

SHEET GENERAL NOTES
EL104 & EL104-S: EXTERIOR RATED IN GROUND RECESSED FLOOD LIGHT RESERVED TO PROVIDE TREES UP LIGHTING.

LOCATION OF THE FIXTURES IS INDICATIVE, PENDING TO FINAL LANDSCAPE DESIGN. PE TO SUPPLEMENT JLLP

CRESTRON LIGHTING CONTROL SYSTEM WITH VAC/OCC/DAYLIGHT AND/OR OTHER SENSORS AS REQUIRED BY TITLE 24 AND SHOWN IN PE DRAWINGS.

SHEET KEY NOTES
A
B
LIGHT FIXTURES WITH A CONTROL ZONE ARE TO BE DIMMED/CONTROLLED BY ALL NEW CRESTRON LIGHTING CONTROL SYSTEM.

ALL NEW CRESTRON CAEN-GREEN LIGHT DIMMING SYSTEM TO BE SPECIFIED AND DESIGNED INTO THE PROJECT, ABOUT ONE 5X2

CAEN MLO PANEL ALONG WITH TOUCH SCREEN LIGHTING CONTROL SYSTEM TO BE UNIFIED WITH AV USER INTERFACE AND

SIMPLE CRESTRON ROOM LIGHTING CONTROL KEY PADS ALONG WITH ANY OCC/VAC/DAYLIGHT SENSORS AS REQUIRED BY TITLE 24 STANDARDS REFER TO PE.

CONTRACTOR TO AIM, ADJUST, FOCUS, RELAMP, RELENS FIXTURES AS REQUIRED DURING LIGHTING AIMING WORK WITH LIGHTING CONSULTANT. PROVIDE ALL TOOLS, GLOVES, LADDERS, LIFTS, AS REQUIRED, COORDINATE AND SCHEDULE ALL AIMING WITH LIGHTING CONSULTANT AND ALL OTHER TRADES AND OPERATIONS SO ALL FIXTURES ARE ACCESSIBLE. 1 C OUTDOOR LIGHTING TO COMPLY WITH THE SECTION 17.300.040 OF CULVER CITY MUNICIPAL CODE. (TYP.)
LCS = LIGHTING CONTROL STATION - CRESTRON CONTROL SCREEN FLUSH WALL MOUNT AT STANDARD SWITCH HEIGHT,

TOUCH SCREEN INTERFACE FULLY PROGRAMMED WITH CUSTOM PROPERTY BRAND LOGOS, COLORS, SCREEN

LAYOUTS, TO PROVIDE ROOM COMBINE/DECOMBINE LIGHTING ZONE FUNCTIONS, MANUAL LIGHTING ZONE CONTROLS AND PREPROGRAMMED LIGHTING SCENE PRESET RECALLS. CONTRACTOR TO PROVIDE CRESTRON DIMMING PANEL

PROCESSORS AND TOUCH SCREENS TO PROVIDE LIGHTING CONTROL INTENT AS SHOWN IN CONJUNCTION WITH

CRESTRON AUDIO VISUAL SYSTEMS DESIGN AND SPECIFIED BY AUDIO VISUAL DESIGN CONSULTANT, CRESTRON OR

CONTRACTOR TO REFER TO JLLP LIGHTING CONTROL DIAGRAM, AUDIO VISUAL SYSTEM PLANS AND SPECIFICATIONS,

ELECTRICAL ENGINEER CONTROL PLANS AND SPECIFICATIONS TO FULLY COORDINATE ANY CRESTRON SYSTEMS

UNIFICATION IN ORDER TO ILLUMINATE ANT REDUNDANT CRESTRON SYSTEM EQUIPMENT (TOUCH SCREEN FOR EXAMPLE) THAT CAN SERVE BOTH LIGHTING AND AUDIO VISUAL INTERFACE FUNCTIONS.

SEE SPECIALTY LIGHTING CONTROL PLANS AND SPECIFICATIONS. 2 2
1 AV-8.00
3 (TYP.)
EL106: EXTERIOR RATED MINIATURE LINEAR LED STRIP LIGHT TO BE INTEGRATED INSTALLED IN THE HANDRAILS, ALL FIXTURE, WIRING AND DRIVER BOXES TO BE CONCEALED FROM PUBLIC VIEW. CONTRACTOR TO COORDINATE WITH

LIGHT RAIL MANUFACTURER TO PROVIDE FULLY COMPLETE SHOP DRAWINGS FOR DESIGN TEAM REVIEW AND APPROVAL. PE TO SUPPLEMENT JLLP CRESTRON LIGHTING CONTROL SYSTEM WITH VAC/OCC/DAYLIGHT AND/OR OTHER SENSORS AS REQUIRED BY TITLE 24 AND SHOWN IN PE DRAWINGS. 3 4
4 SL-6.01
(CONT.)
L113: MINIATURE LINEAR LED STRIP LIGHT TO BE INTEGRATED INSTALL IN FOR SIDES INSIDE THE ALCOVE DETAIL, FIXTURE TO BE FULLY CONCEALED FROM THE PUBLIC VIEW, SEE JLLP DETAIL SHEET. 4 CRESTRON KEY PAD LIGHT SWITCHES SUPPLEMENTED WITH LOCAL ROOM LIGHTING CONTROL VAC/OCC/DAYLIGHT SENSORS AS REQUIRED BY TITLE 24.
5 6
(CONT.)
2 SL-6.02
L120: MINIATURE LINEAR LED STRIP LIGHT IN A CHANNEL AND FROSTED LENS TO BE SURFACE MOUNT UNDERNEATH THE UPPER CABINET FOR TASK LIGHTING, CONTRACTOR TO PROVIDE A 1" LIP AT THE BOTTOM EDGE OF THE UPPER CABINET TO FULLY CONCEAL THE FIXTURE FROM PUBLIC VIEW.
6 5
(TYP.)
4 (CONT.)
4 (CONT.)
4 (CONT.)
4 (CONT.)
NO. DATE DESCRIPTION
06/09/21 50% CONSTRUCTION DOCUMENTS
09/24/21 75% CD (PLAN CHECK SET)
4 SL-6.01
4 SL-6.01
4 SL-6.01
4 SL-6.01
2 1
AV-8.00
1 SL-8.00
1 SL-8.00
J
J J

JJ J JJ
AD
AD
S-7
S-6
J
J

VIEW RANGE

PRIMARY RANGE
TOP: ASSOC LEVEL (LEVEL 1) OFFSET:7'-6"
CUT PLANE: ASSOC LEVEL (LEVEL 1) OFFSET:4'-0"
BOTTOM: ASSOC LEVEL (LEVEL 1) OFFSET:-1'-6"

VIEW DEPTH
LEVEL: ASSOC LEVEL (LEVEL 1) OFFSET:-1'-6"
LS-5
EL104-S
LS-5
EL104-S
LS-5
EL104-S
LS-5
EL104-S

LCS-TS WALL MOUNTED CRESTRON

TOUCH SCREEN FOR BOTH THEATER

HOUSE LIGHTING AND THEATER AV

SYSTEM INTERFACE REFER TO AV
SYSTEM PLAN.

ST-3
EL106
LS-1
EL104
LS-1
EL104
LS-1
EL104
LS-1
EL104
LS-1
EL104
LS-1
EL104
LS-1
EL104
LS-1
EL104
S-7
L104
S-7
L104
LB-1
L113
LB-1
L113
LB-1
L113
LB-1
L113
LB-1
L113
3 3
1 1
A A
B B
C C
D D
4 4
5 5
FF
EE

4.8 4.8
6 6
2 2

1.9 1.9

3.1 3.1
C.9 C.9
D.9D.9
D.1D.1
LS-8
J-BOXST-3
EL106

AVLC-TS AVLC-T

LCS-T WALL MOUNTED CRESTRON

TOUCH SCREEN FOR BOTH THEATER

HOUSE LIGHTING AND THEATER AV

SYSTEM INTERFACE REFER TO AV
SYSTEM PLAN.

FILE NAME:

CERTIFICATION:
- PROJECT ADDRESS
10858 & 10876 CULVER BLVD.

CULVER CITY, CA 90230
- PROJECT OWNER
- SOILS ENGINEER
SUBSURFACE DESIGNS INC.
12848 FOOTHILL BLVD.

SYLMAR, CA 91342
T: 818-898-1595
- CIVIL ENGINEER
LC ENGINEERING GROUP, INC.
889 PIERCE CT., STE. 101
THOUSAND OAKS, CA 91360
T: 805-497-1244
- LANDSCAPE ARCHITECT

SQLA, INC
2669 SATURN ST
BREA, CA 92821
T: 562-905-0800
- STRUCTURAL ENGINEER

NOUS ENGINEERING
600 WILSHIRE BLVD. SUITE 760
LOS ANGELES, CA 90017
T: 213-627-6687
- MEP

ALFA TECH
510W 6TH STREET, SUITE #1105
LOS ANGELES, CA 90014
- LIGHTING & THEATER CONSULTANT

JOHN LEVY LIGHTING PRODUCTIONS, JLLP
350 S FIGUEROA ST. #127
LOS ANGELES, CA 90071
T: 213-629-9949
- ACOUSTICAL CONSULTANT

NICK ANTONIO ACOUSTICS
4487 COLBATH AVE. #306
SHERMAN OAKS, CA 91423
T: 310-404-1833
- SECURITY CONSULTANT

SISTEMS INTEGRATION
606 S. HILL ST., SUITE #1009
LOS ANGELES, CA 90014
T: 213-623-5584
- SIGNAGE CONSULTANT

ROBERT FITCH DESIGN
1115 S ORANGE GROVE AVE. #1
LOS ANGELES, CA 90019
T: 323-424-3146
- SPECIFICATION CONSULTANT

CG-ASSOCIATES
2626 NAPLES AVE.

VENICE, CA 90291
T: 310-578-5773
ISSUE OR REVISION NOTES:

DRAWING TITLE:

SHEET NO:

DRAWING SCALE:

SHEET SIZE:

PROJECT NO:

DATE STAMP:
24x36
2404 WILSHIRE BLVD. STE. 12D
LOS ANGELES, CA 90057
TEL: 1.213.568.3578
ARCHITECT: BRIAN WICKERSHAM
LIC: CA C-32742 / EXP: 07.31.21
AUX

ARCHITECTURE

NOT FOR CONSTRUCTION
1/8" = 1'-0"
9/22/2021 4:46:13 PM
BIM 360://Creative Community Center/JLLP_Lighting_Wende CCC_R20.rvt SL-2.11

SPECIALTY LIGHTING -
FLOOR PLAN - LEVEL 1
184

CREATIVE

COMMUNITY
CENTER
1/8" = 1'-0"SL-2.11
1 SPECIALTY LIGHTING - FLOOR PLAN - LEVEL 1 THESE DESIGN DRAWINGS REPRESENT VISUAL CONCEPTS AND SUGGESTIONS ONLY. JLLP INC. IS NOT A LICENSED ENGINEER OR

ARCHITECT OR OTHERWISE QUALIFIED TO DETERMINE WHETHER THE

DESIGN MEETS APPLICABLE STRUCTURAL AND SAFETY STANDARDS OR BUILDING CODE REQUIREMENTS. ACCORDINGLY JLLP DOES NOT ASSUME

RESPONSIBILITY FOR THE STRUCTURAL INTEGRITY OF OR THE BUILDING OR

SAFETY CODE COMPLIANCE OF THE DESIGN OR FOR THE CONSTRUCTION,

RIGGING, HANDLING OR THE USE OF THE ARCHITECTURAL ELEMENTS AND EQUIPMENT DEPICTED OR REQUIRED IN CONNECTION WITH SUCH DESIGN. 1 L1................LIGHT FIXTURE TYPE / INSTANCE QUANTITY A-1..............LIGHTING CONTROL ZONE(WHEN APPLICABLE TO A LIGHTING

CONTROL SYSTEM)
.................................BEAM ANGLES................ (4)0

LIGHT FIXTURE ANNOTATION KEY
....................LIGHT FIXTURE SYMBOL (VARIES)

SHEET GENERAL NOTES
EL104 & EL104-S: EXTERIOR RATED IN GROUND RECESSED FLOOD LIGHT RESERVED TO PROVIDE TREES UP LIGHTING.

LOCATION OF THE FIXTURES IS INDICATIVE, PENDING TO FINAL LANDSCAPE DESIGN. PE TO SUPPLEMENT JLLP

CRESTRON LIGHTING CONTROL SYSTEM WITH VAC/OCC/DAYLIGHT AND/OR OTHER SENSORS AS REQUIRED BY TITLE 24 AND SHOWN IN PE DRAWINGS.

SHEET KEY NOTES
A
B
LIGHT FIXTURES WITH A CONTROL ZONE ARE TO BE DIMMED/CONTROLLED BY ALL NEW CRESTRON LIGHTING CONTROL SYSTEM.

ALL NEW CRESTRON CAEN-GREEN LIGHT DIMMING SYSTEM TO BE SPECIFIED AND DESIGNED INTO THE PROJECT, ABOUT ONE 5X2

CAEN MLO PANEL ALONG WITH TOUCH SCREEN LIGHTING CONTROL SYSTEM TO BE UNIFIED WITH AV USER INTERFACE AND

SIMPLE CRESTRON ROOM LIGHTING CONTROL KEY PADS ALONG WITH ANY OCC/VAC/DAYLIGHT SENSORS AS REQUIRED BY TITLE 24 STANDARDS REFER TO PE.

CONTRACTOR TO AIM, ADJUST, FOCUS, RELAMP, RELENS FIXTURES AS REQUIRED DURING LIGHTING AIMING WORK WITH LIGHTING CONSULTANT. PROVIDE ALL TOOLS, GLOVES, LADDERS, LIFTS, AS REQUIRED, COORDINATE AND SCHEDULE ALL AIMING WITH LIGHTING CONSULTANT AND ALL OTHER TRADES AND OPERATIONS SO ALL FIXTURES ARE ACCESSIBLE. 1 C OUTDOOR LIGHTING TO COMPLY WITH THE SECTION 17.300.040 OF CULVER CITY MUNICIPAL CODE. (TYP.)
LCS = LIGHTING CONTROL STATION - CRESTRON CONTROL SCREEN FLUSH WALL MOUNT AT STANDARD SWITCH HEIGHT,

TOUCH SCREEN INTERFACE FULLY PROGRAMMED WITH CUSTOM PROPERTY BRAND LOGOS, COLORS, SCREEN

LAYOUTS, TO PROVIDE ROOM COMBINE/DECOMBINE LIGHTING ZONE FUNCTIONS, MANUAL LIGHTING ZONE CONTROLS AND PREPROGRAMMED LIGHTING SCENE PRESET RECALLS. CONTRACTOR TO PROVIDE CRESTRON DIMMING PANEL

PROCESSORS AND TOUCH SCREENS TO PROVIDE LIGHTING CONTROL INTENT AS SHOWN IN CONJUNCTION WITH

CRESTRON AUDIO VISUAL SYSTEMS DESIGN AND SPECIFIED BY AUDIO VISUAL DESIGN CONSULTANT, CRESTRON OR

CONTRACTOR TO REFER TO JLLP LIGHTING CONTROL DIAGRAM, AUDIO VISUAL SYSTEM PLANS AND SPECIFICATIONS,

ELECTRICAL ENGINEER CONTROL PLANS AND SPECIFICATIONS TO FULLY COORDINATE ANY CRESTRON SYSTEMS

UNIFICATION IN ORDER TO ILLUMINATE ANT REDUNDANT CRESTRON SYSTEM EQUIPMENT (TOUCH SCREEN FOR EXAMPLE) THAT CAN SERVE BOTH LIGHTING AND AUDIO VISUAL INTERFACE FUNCTIONS.

SEE SPECIALTY LIGHTING CONTROL PLANS AND SPECIFICATIONS. 2 2
1 AV-8.00
3 (TYP.)
EL106: EXTERIOR RATED MINIATURE LINEAR LED STRIP LIGHT TO BE INTEGRATED INSTALLED IN THE HANDRAILS, ALL FIXTURE, WIRING AND DRIVER BOXES TO BE CONCEALED FROM PUBLIC VIEW. CONTRACTOR TO COORDINATE WITH

LIGHT RAIL MANUFACTURER TO PROVIDE FULLY COMPLETE SHOP DRAWINGS FOR DESIGN TEAM REVIEW AND APPROVAL. PE TO SUPPLEMENT JLLP CRESTRON LIGHTING CONTROL SYSTEM WITH VAC/OCC/DAYLIGHT AND/OR OTHER SENSORS AS REQUIRED BY TITLE 24 AND SHOWN IN PE DRAWINGS. 3 4
4 SL-6.01
(CONT.)
L113: MINIATURE LINEAR LED STRIP LIGHT TO BE INTEGRATED INSTALL IN FOR SIDES INSIDE THE ALCOVE DETAIL, FIXTURE TO BE FULLY CONCEALED FROM THE PUBLIC VIEW, SEE JLLP DETAIL SHEET. 4 CRESTRON KEY PAD LIGHT SWITCHES SUPPLEMENTED WITH LOCAL ROOM LIGHTING CONTROL VAC/OCC/DAYLIGHT SENSORS AS REQUIRED BY TITLE 24.
5 6
(CONT.)
2 SL-6.02
L120: MINIATURE LINEAR LED STRIP LIGHT IN A CHANNEL AND FROSTED LENS TO BE SURFACE MOUNT UNDERNEATH THE UPPER CABINET FOR TASK LIGHTING, CONTRACTOR TO PROVIDE A 1" LIP AT THE BOTTOM EDGE OF THE UPPER CABINET TO FULLY CONCEAL THE FIXTURE FROM PUBLIC VIEW.
6 5
(TYP.)
4 (CONT.)
4 (CONT.)
4 (CONT.)
4 (CONT.)
NO. DATE DESCRIPTION
06/09/21 50% CONSTRUCTION DOCUMENTS
09/24/21 75% CD (PLAN CHECK SET)
4 SL-6.01
4 SL-6.01
4 SL-6.01
4 SL-6.01
2 1
AV-8.00
1 SL-8.00
1 SL-8.00

PROPOSED LIGHTING

AUX ARCHITECTURE
2021.10.20
64 CULVER CITY COMPREHENSIVE PLAN
S-1
S-2
JJJ

VIEW RANGE

PRIMARY RANGE
TOP: ASSOC LEVEL (LEVEL 2) OFFSET:7'-6"
CUT PLANE: ASSOC LEVEL (LEVEL 2) OFFSET:4'-0"
BOTTOM: ASSOC LEVEL (LEVEL 2) OFFSET:-1'-6"

VIEW DEPTH
LEVEL: ASSOC LEVEL (LEVEL 2) OFFSET:-1'-6"
LS-2
J-BOX
3 3
1 1
A A
B B
C C
D D
4 4
5 5
FF
EE

4.8 4.8
6 6
2 2

1.9 1.9

3.1 3.1
C.9 C.9
D.9D.9
D.1D.1
PF-2
EL102PF-2
EL102 (RAIL LIGHTING APPROX.
52' AT LEVEL 2)

AVLC-CR
FILE NAME:

CERTIFICATION:
- PROJECT ADDRESS
10858 & 10876 CULVER BLVD.

CULVER CITY, CA 90230
- PROJECT OWNER
- SOILS ENGINEER
SUBSURFACE DESIGNS INC.
12848 FOOTHILL BLVD.

SYLMAR, CA 91342
T: 818-898-1595
- CIVIL ENGINEER
LC ENGINEERING GROUP, INC.
889 PIERCE CT., STE. 101
THOUSAND OAKS, CA 91360
T: 805-497-1244
- LANDSCAPE ARCHITECT

SQLA, INC
2669 SATURN ST
BREA, CA 92821
T: 562-905-0800
- STRUCTURAL ENGINEER

NOUS ENGINEERING
600 WILSHIRE BLVD. SUITE 760
LOS ANGELES, CA 90017
T: 213-627-6687
- MEP

ALFA TECH
510W 6TH STREET, SUITE #1105
LOS ANGELES, CA 90014
- LIGHTING & THEATER CONSULTANT

JOHN LEVY LIGHTING PRODUCTIONS, JLLP
350 S FIGUEROA ST. #127
LOS ANGELES, CA 90071
T: 213-629-9949
- ACOUSTICAL CONSULTANT

NICK ANTONIO ACOUSTICS
4487 COLBATH AVE. #306
SHERMAN OAKS, CA 91423
T: 310-404-1833
- SECURITY CONSULTANT

SISTEMS INTEGRATION
606 S. HILL ST., SUITE #1009
LOS ANGELES, CA 90014
T: 213-623-5584
- SIGNAGE CONSULTANT

ROBERT FITCH DESIGN
1115 S ORANGE GROVE AVE. #1
LOS ANGELES, CA 90019
T: 323-424-3146
- SPECIFICATION CONSULTANT

CG-ASSOCIATES
2626 NAPLES AVE.

VENICE, CA 90291
T: 310-578-5773
ISSUE OR REVISION NOTES:

DRAWING TITLE:

SHEET NO:

DRAWING SCALE:

SHEET SIZE:

PROJECT NO:

DATE STAMP:
24x36
2404 WILSHIRE BLVD. STE. 12D
LOS ANGELES, CA 90057
TEL: 1.213.568.3578
ARCHITECT: BRIAN WICKERSHAM
LIC: CA C-32742 / EXP: 07.31.21
AUX

ARCHITECTURE

NOT FOR CONSTRUCTION
1/8" = 1'-0"
9/22/2021 4:18:52 PM
BIM 360://Creative Community Center/JLLP_Lighting_Wende CCC_R20.rvt SL-2.12

SPECIALTY LIGHTING -
FLOOR PLAN - LEVEL 2
184

CREATIVE

COMMUNITY
CENTER

SHEET GENERAL NOTES
LCS = LIGHTING CONTROL STATION - CRESTRON CONTROL SCREEN FLUSH WALL MOUNT AT STANDARD SWITCH HEIGHT,

TOUCH SCREEN INTERFACE FULLY PROGRAMMED WITH CUSTOM PROPERTY BRAND LOGOS, COLORS, SCREEN

LAYOUTS, TO PROVIDE ROOM COMBINE/DECOMBINE LIGHTING ZONE FUNCTIONS, MANUAL LIGHTING ZONE CONTROLS AND PREPROGRAMMED LIGHTING SCENE PRESET RECALLS. CONTRACTOR TO PROVIDE CRESTRON DIMMING PANEL

PROCESSORS AND TOUCH SCREENS TO PROVIDE LIGHTING CONTROL INTENT AS SHOWN IN CONJUNCTION WITH

CRESTRON AUDIO VISUAL SYSTEMS DESIGN AND SPECIFIED BY AUDIO VISUAL DESIGN CONSULTANT, CRESTRON OR

CONTRACTOR TO REFER TO JLLP LIGHTING CONTROL DIAGRAM, AUDIO VISUAL SYSTEM PLANS AND SPECIFICATIONS,

ELECTRICAL ENGINEER CONTROL PLANS AND SPECIFICATIONS TO FULLY COORDINATE ANY CRESTRON SYSTEMS

UNIFICATION IN ORDER TO ILLUMINATE ANT REDUNDANT CRESTRON SYSTEM EQUIPMENT (TOUCH SCREEN FOR EXAMPLE) THAT CAN SERVE BOTH LIGHTING AND AUDIO VISUAL INTERFACE FUNCTIONS.

SEE SPECIALTY LIGHTING CONTROL PLANS AND SPECIFICATIONS.

SHEET KEY NOTES
A
B

THESE DESIGN DRAWINGS REPRESENT VISUAL CONCEPTS AND
SUGGESTIONS ONLY. JLLP INC. IS NOT A LICENSED ENGINEER OR

ARCHITECT OR OTHERWISE QUALIFIED TO DETERMINE WHETHER THE

DESIGN MEETS APPLICABLE STRUCTURAL AND SAFETY STANDARDS OR BUILDING CODE REQUIREMENTS. ACCORDINGLY JLLP DOES NOT ASSUME

RESPONSIBILITY FOR THE STRUCTURAL INTEGRITY OF OR THE BUILDING OR

SAFETY CODE COMPLIANCE OF THE DESIGN OR FOR THE CONSTRUCTION,

RIGGING, HANDLING OR THE USE OF THE ARCHITECTURAL ELEMENTS AND EQUIPMENT DEPICTED OR REQUIRED IN CONNECTION WITH SUCH DESIGN. 2 NOT USED.

LIGHT FIXTURES WITH A CONTROL ZONE ARE TO BE DIMMED/CONTROLLED BY ALL NEW CRESTRON LIGHTING CONTROL SYSTEM.

ALL NEW CRESTRON CAEN-GREEN LIGHT DIMMING SYSTEM TO BE SPECIFIED AND DESIGNED INTO THE PROJECT, ABOUT ONE 5X2 CAEN MLO PANEL ALONG WITH TOUCH SCREEN LIGHTING CONTROL SYSTEM TO BE UNIFIED WITH AV USER INTERFACE AND

SIMPLE CRESTRON ROOM LIGHTING CONTROL KEY PADS ALONG WITH ANY OCC/VAC/DAYLIGHT SENSORS AS REQUIRED BY TITLE 24 STANDARDS REFER TO PE.

CONTRACTOR TO AIM, ADJUST, FOCUS, RELAMP, RELENS FIXTURES AS REQUIRED DURING LIGHTING AIMING WORK WITH LIGHTING CONSULTANT. PROVIDE ALL TOOLS, GLOVES, LADDERS, LIFTS, AS REQUIRED, COORDINATE AND SCHEDULE ALL AIMING WITH LIGHTING CONSULTANT AND ALL OTHER TRADES AND OPERATIONS SO ALL FIXTURES ARE ACCESSIBLE. 1 L1................LIGHT FIXTURE TYPE / INSTANCE QUANTITY A-1..............LIGHTING CONTROL ZONE(WHEN APPLICABLE TO A LIGHTING

CONTROL SYSTEM)
.................................BEAM ANGLES................ (4)0

LIGHT FIXTURE ANNOTATION KEY
....................LIGHT FIXTURE SYMBOL (VARIES)
1 1
AV-8.00
3 EL102: EXTERIOR RATED LINEAR LED STRIP LIGHT TO BE INTEGRATED INSTALLED IN THE GUARDRAIL TO PROVIDE GENERAL LOW LEVEL LIGHTING AT THE EXTERIOR PRE-FUNCTION. J-BOX TO PROVIDE POWER AND CONTROL CIRCUIT TO LED STRIP, AT MAX. 40' RUN. PE TO SUPPLEMENT JLLP CRESTRON LIGHTING CONTROL SYSTEM WITH VAC/OCC/DAYLIGHT AND/OR OTHER SENSORS AS REQUIRED BY TITLE 24 AND SHOWN IN PE DRAWINGS. 3 C OUTDOOR LIGHTING TO COMPLY WITH THE SECTION 17.300.040 OF CULVER CITY MUNICIPAL CODE. (TYP.)
44 4 CRESTRON KEY PAD LIGHT SWITCHES SUPPLEMENTED WITH LOCAL ROOM LIGHTING CONTROL VAC/OCC/DAYLIGHT SENSORS AS REQUIRED BY TITLE 24.
5 J-BOX RESERVES POWER AND CIRCUIT FOR FUTURE PLANTING / LANDSCAPE LIGHTING. PE TO SUPPLEMENT JLLP CRESTRON LIGHTING CONTROL SYSTEM WITH VAC/OCC/DAYLIGHT AND/OR OTHER SENSORS AS REQUIRED BY TITLE 24 AND SHOWN IN PE DRAWINGS.
5 (TYP.)

AVLC-CR WALL MOUNTED

CRESTRON TOUCH SCREEN FOR

BOTH CLASSROOM LIGHTING AND

AV SYSTEM INTERFACE REFER TO
AV SYSTEM PLAN.
(TYP.)
(TYP.)
NO. DATE DESCRIPTION
06/09/21 50% CONSTRUCTION DOCUMENTS
09/24/21 75% CD (PLAN CHECK SET)
1 SL-8.00
S-1
S-2
JJJ

VIEW RANGE

PRIMARY RANGE
TOP: ASSOC LEVEL (LEVEL 2) OFFSET:7'-6"
CUT PLANE: ASSOC LEVEL (LEVEL 2) OFFSET:4'-0"
BOTTOM: ASSOC LEVEL (LEVEL 2) OFFSET:-1'-6"

VIEW DEPTH
LEVEL: ASSOC LEVEL (LEVEL 2) OFFSET:-1'-6"
LS-2
J-BOX
3 3
1 1
A A
B B
C C
D D
4 4
5 5
FF
EE

4.8 4.8
6 6
2 2

1.9 1.9

3.1 3.1
C.9 C.9
D.9D.9
D.1D.1
PF-2
EL102PF-2
EL102 (RAIL LIGHTING APPROX.
52' AT LEVEL 2)

AVLC-CR
FILE NAME:

CERTIFICATION:
- PROJECT ADDRESS
10858 & 10876 CULVER BLVD.

CULVER CITY, CA 90230
- PROJECT OWNER
- SOILS ENGINEER
SUBSURFACE DESIGNS INC.
12848 FOOTHILL BLVD.

SYLMAR, CA 91342
T: 818-898-1595
- CIVIL ENGINEER
LC ENGINEERING GROUP, INC.
889 PIERCE CT., STE. 101
THOUSAND OAKS, CA 91360
T: 805-497-1244
- LANDSCAPE ARCHITECT

SQLA, INC
2669 SATURN ST
BREA, CA 92821
T: 562-905-0800
- STRUCTURAL ENGINEER

NOUS ENGINEERING
600 WILSHIRE BLVD. SUITE 760
LOS ANGELES, CA 90017
T: 213-627-6687
- MEP

ALFA TECH
510W 6TH STREET, SUITE #1105
LOS ANGELES, CA 90014
- LIGHTING & THEATER CONSULTANT

JOHN LEVY LIGHTING PRODUCTIONS, JLLP
350 S FIGUEROA ST. #127
LOS ANGELES, CA 90071
T: 213-629-9949
- ACOUSTICAL CONSULTANT

NICK ANTONIO ACOUSTICS
4487 COLBATH AVE. #306
SHERMAN OAKS, CA 91423
T: 310-404-1833
- SECURITY CONSULTANT

SISTEMS INTEGRATION
606 S. HILL ST., SUITE #1009
LOS ANGELES, CA 90014
T: 213-623-5584
- SIGNAGE CONSULTANT

ROBERT FITCH DESIGN
1115 S ORANGE GROVE AVE. #1
LOS ANGELES, CA 90019
T: 323-424-3146
- SPECIFICATION CONSULTANT

CG-ASSOCIATES
2626 NAPLES AVE.

VENICE, CA 90291
T: 310-578-5773
ISSUE OR REVISION NOTES:

DRAWING TITLE:

SHEET NO:

DRAWING SCALE:

SHEET SIZE:

PROJECT NO:

DATE STAMP:
24x36
2404 WILSHIRE BLVD. STE. 12D
LOS ANGELES, CA 90057
TEL: 1.213.568.3578
ARCHITECT: BRIAN WICKERSHAM
LIC: CA C-32742 / EXP: 07.31.21
AUX

ARCHITECTURE

NOT FOR CONSTRUCTION
1/8" = 1'-0"
9/22/2021 4:18:52 PM
BIM 360://Creative Community Center/JLLP_Lighting_Wende CCC_R20.rvt SL-2.12

SPECIALTY LIGHTING -
FLOOR PLAN - LEVEL 2
184

CREATIVE

COMMUNITY
CENTER

SHEET GENERAL NOTES
LCS = LIGHTING CONTROL STATION - CRESTRON CONTROL SCREEN FLUSH WALL MOUNT AT STANDARD SWITCH HEIGHT,

TOUCH SCREEN INTERFACE FULLY PROGRAMMED WITH CUSTOM PROPERTY BRAND LOGOS, COLORS, SCREEN

LAYOUTS, TO PROVIDE ROOM COMBINE/DECOMBINE LIGHTING ZONE FUNCTIONS, MANUAL LIGHTING ZONE CONTROLS AND PREPROGRAMMED LIGHTING SCENE PRESET RECALLS. CONTRACTOR TO PROVIDE CRESTRON DIMMING PANEL

PROCESSORS AND TOUCH SCREENS TO PROVIDE LIGHTING CONTROL INTENT AS SHOWN IN CONJUNCTION WITH

CRESTRON AUDIO VISUAL SYSTEMS DESIGN AND SPECIFIED BY AUDIO VISUAL DESIGN CONSULTANT, CRESTRON OR

CONTRACTOR TO REFER TO JLLP LIGHTING CONTROL DIAGRAM, AUDIO VISUAL SYSTEM PLANS AND SPECIFICATIONS,

ELECTRICAL ENGINEER CONTROL PLANS AND SPECIFICATIONS TO FULLY COORDINATE ANY CRESTRON SYSTEMS

UNIFICATION IN ORDER TO ILLUMINATE ANT REDUNDANT CRESTRON SYSTEM EQUIPMENT (TOUCH SCREEN FOR EXAMPLE) THAT CAN SERVE BOTH LIGHTING AND AUDIO VISUAL INTERFACE FUNCTIONS.

SEE SPECIALTY LIGHTING CONTROL PLANS AND SPECIFICATIONS.

SHEET KEY NOTES
A
B

THESE DESIGN DRAWINGS REPRESENT VISUAL CONCEPTS AND
SUGGESTIONS ONLY. JLLP INC. IS NOT A LICENSED ENGINEER OR

ARCHITECT OR OTHERWISE QUALIFIED TO DETERMINE WHETHER THE

DESIGN MEETS APPLICABLE STRUCTURAL AND SAFETY STANDARDS OR BUILDING CODE REQUIREMENTS. ACCORDINGLY JLLP DOES NOT ASSUME

RESPONSIBILITY FOR THE STRUCTURAL INTEGRITY OF OR THE BUILDING OR

SAFETY CODE COMPLIANCE OF THE DESIGN OR FOR THE CONSTRUCTION,

RIGGING, HANDLING OR THE USE OF THE ARCHITECTURAL ELEMENTS AND EQUIPMENT DEPICTED OR REQUIRED IN CONNECTION WITH SUCH DESIGN. 2 NOT USED.

LIGHT FIXTURES WITH A CONTROL ZONE ARE TO BE DIMMED/CONTROLLED BY ALL NEW CRESTRON LIGHTING CONTROL SYSTEM.

ALL NEW CRESTRON CAEN-GREEN LIGHT DIMMING SYSTEM TO BE SPECIFIED AND DESIGNED INTO THE PROJECT, ABOUT ONE 5X2 CAEN MLO PANEL ALONG WITH TOUCH SCREEN LIGHTING CONTROL SYSTEM TO BE UNIFIED WITH AV USER INTERFACE AND

SIMPLE CRESTRON ROOM LIGHTING CONTROL KEY PADS ALONG WITH ANY OCC/VAC/DAYLIGHT SENSORS AS REQUIRED BY TITLE 24 STANDARDS REFER TO PE.

CONTRACTOR TO AIM, ADJUST, FOCUS, RELAMP, RELENS FIXTURES AS REQUIRED DURING LIGHTING AIMING WORK WITH LIGHTING CONSULTANT. PROVIDE ALL TOOLS, GLOVES, LADDERS, LIFTS, AS REQUIRED, COORDINATE AND SCHEDULE ALL AIMING WITH LIGHTING CONSULTANT AND ALL OTHER TRADES AND OPERATIONS SO ALL FIXTURES ARE ACCESSIBLE. 1 L1................LIGHT FIXTURE TYPE / INSTANCE QUANTITY A-1..............LIGHTING CONTROL ZONE(WHEN APPLICABLE TO A LIGHTING

CONTROL SYSTEM)
.................................BEAM ANGLES................ (4)0

LIGHT FIXTURE ANNOTATION KEY
....................LIGHT FIXTURE SYMBOL (VARIES)
1 1
AV-8.00
3 EL102: EXTERIOR RATED LINEAR LED STRIP LIGHT TO BE INTEGRATED INSTALLED IN THE GUARDRAIL TO PROVIDE GENERAL LOW LEVEL LIGHTING AT THE EXTERIOR PRE-FUNCTION. J-BOX TO PROVIDE POWER AND CONTROL CIRCUIT TO LED STRIP, AT MAX. 40' RUN. PE TO SUPPLEMENT JLLP CRESTRON LIGHTING CONTROL SYSTEM WITH VAC/OCC/DAYLIGHT AND/OR OTHER SENSORS AS REQUIRED BY TITLE 24 AND SHOWN IN PE DRAWINGS. 3 C OUTDOOR LIGHTING TO COMPLY WITH THE SECTION 17.300.040 OF CULVER CITY MUNICIPAL CODE. (TYP.)
44 4 CRESTRON KEY PAD LIGHT SWITCHES SUPPLEMENTED WITH LOCAL ROOM LIGHTING CONTROL VAC/OCC/DAYLIGHT SENSORS AS REQUIRED BY TITLE 24.
5 J-BOX RESERVES POWER AND CIRCUIT FOR FUTURE PLANTING / LANDSCAPE LIGHTING. PE TO SUPPLEMENT JLLP CRESTRON LIGHTING CONTROL SYSTEM WITH VAC/OCC/DAYLIGHT AND/OR OTHER SENSORS AS REQUIRED BY TITLE 24 AND SHOWN IN PE DRAWINGS.
5 (TYP.)

AVLC-CR WALL MOUNTED

CRESTRON TOUCH SCREEN FOR

BOTH CLASSROOM LIGHTING AND

AV SYSTEM INTERFACE REFER TO
AV SYSTEM PLAN.
(TYP.)
(TYP.)
NO. DATE DESCRIPTION
06/09/21 50% CONSTRUCTION DOCUMENTS
09/24/21 75% CD (PLAN CHECK SET)
1 SL-8.00

PROPOSED LIGHTING

AUX ARCHITECTURE
2021.10.20
65 CULVER CITY COMPREHENSIVE PLAN
J
AD
S-5
RS-3
S-5
JJ

VIEW RANGE

PRIMARY RANGE
TOP: ASSOC LEVEL (LEVEL 3) OFFSET:7'-6"
CUT PLANE: ASSOC LEVEL (LEVEL 3) OFFSET:4'-0"
BOTTOM: ASSOC LEVEL (LEVEL 3) OFFSET:-1'-6"

VIEW DEPTH
LEVEL: ASSOC LEVEL (LEVEL 3) OFFSET:-1'-6"
-
---
-
---
2 SL-4.01

LCS-EX WALL MOUNTED

CRESTRON TOUCH SCREEN FOR

BOTH EXHIBITION LIGHTING AND

AV SYSTEM INTERFACE REFER TO
AV SYSTEM PLAN.

AVLC-EX
LS-3
J-BOX
3 SL-4.01
1 1
A A
B B
C C
D D
4 4
5 5
EE

4.8 4.8
6 6
2 2

1.9 1.9
C.9 C.9
D.9D.9
D.1D.1
PF-4
EL102
PF-4
EL102
(RAIL LIGHTING APPROX.
52' AT LEVEL 3)
FILE NAME:

CERTIFICATION:
- PROJECT ADDRESS
10858 & 10876 CULVER BLVD.

CULVER CITY, CA 90230
- PROJECT OWNER
- SOILS ENGINEER
SUBSURFACE DESIGNS INC.
12848 FOOTHILL BLVD.

SYLMAR, CA 91342
T: 818-898-1595
- CIVIL ENGINEER
LC ENGINEERING GROUP, INC.
889 PIERCE CT., STE. 101
THOUSAND OAKS, CA 91360
T: 805-497-1244
- LANDSCAPE ARCHITECT

SQLA, INC
2669 SATURN ST
BREA, CA 92821
T: 562-905-0800
- STRUCTURAL ENGINEER

NOUS ENGINEERING
600 WILSHIRE BLVD. SUITE 760
LOS ANGELES, CA 90017
T: 213-627-6687
- MEP

ALFA TECH
510W 6TH STREET, SUITE #1105
LOS ANGELES, CA 90014
- LIGHTING & THEATER CONSULTANT

JOHN LEVY LIGHTING PRODUCTIONS, JLLP
350 S FIGUEROA ST. #127
LOS ANGELES, CA 90071
T: 213-629-9949
- ACOUSTICAL CONSULTANT

NICK ANTONIO ACOUSTICS
4487 COLBATH AVE. #306
SHERMAN OAKS, CA 91423
T: 310-404-1833
- SECURITY CONSULTANT

SISTEMS INTEGRATION
606 S. HILL ST., SUITE #1009
LOS ANGELES, CA 90014
T: 213-623-5584
- SIGNAGE CONSULTANT

ROBERT FITCH DESIGN
1115 S ORANGE GROVE AVE. #1
LOS ANGELES, CA 90019
T: 323-424-3146
- SPECIFICATION CONSULTANT

CG-ASSOCIATES
2626 NAPLES AVE.

VENICE, CA 90291
T: 310-578-5773
ISSUE OR REVISION NOTES:

DRAWING TITLE:

SHEET NO:

DRAWING SCALE:

SHEET SIZE:

PROJECT NO:

DATE STAMP:
24x36
2404 WILSHIRE BLVD. STE. 12D
LOS ANGELES, CA 90057
TEL: 1.213.568.3578
ARCHITECT: BRIAN WICKERSHAM
LIC: CA C-32742 / EXP: 07.31.21
AUX

ARCHITECTURE

NOT FOR CONSTRUCTION
1/8" = 1'-0"
9/22/2021 4:18:57 PM
BIM 360://Creative Community Center/JLLP_Lighting_Wende CCC_R20.rvt SL-2.13

SPECIALTY LIGHTING -
FLOOR PLAN - LEVEL 3
184

CREATIVE

COMMUNITY
CENTER
1/8" = 1'-0"SL-2.13
1 SPECIALTY LIGHTING - FLOOR PLAN - LEVEL 3

THESE DESIGN DRAWINGS REPRESENT VISUAL CONCEPTS AND
SUGGESTIONS ONLY. JLLP INC. IS NOT A LICENSED ENGINEER OR

ARCHITECT OR OTHERWISE QUALIFIED TO DETERMINE WHETHER THE

DESIGN MEETS APPLICABLE STRUCTURAL AND SAFETY STANDARDS OR BUILDING CODE REQUIREMENTS. ACCORDINGLY JLLP DOES NOT ASSUME

RESPONSIBILITY FOR THE STRUCTURAL INTEGRITY OF OR THE BUILDING OR

SAFETY CODE COMPLIANCE OF THE DESIGN OR FOR THE CONSTRUCTION,

RIGGING, HANDLING OR THE USE OF THE ARCHITECTURAL ELEMENTS AND EQUIPMENT DEPICTED OR REQUIRED IN CONNECTION WITH SUCH DESIGN. 1 1
AV-8.00
L1................LIGHT FIXTURE TYPE / INSTANCE QUANTITY A-1..............LIGHTING CONTROL ZONE(WHEN APPLICABLE TO A LIGHTING

CONTROL SYSTEM)
.................................BEAM ANGLES................ (4)0

LIGHT FIXTURE ANNOTATION KEY
....................LIGHT FIXTURE SYMBOL (VARIES)

SHEET GENERAL NOTES
LCS = LIGHTING CONTROL STATION - CRESTRON SCREEN FLUSH WALL MOUNT AT STANDARD SWITCH HEIGHT, TOUCH

SCREEN INTERFACE FULLY PROGRAMMED WITH CUSTOM PROPERTY BRAND LOGOS, COLORS, SCREEN LAYOUTS, TO

PROVIDE ROOM COMBINE/DECOMBINE LIGHTING ZONE FUNCTIONS, MANUAL LIGHTING ZONE CONTROLS AND PREPROGRAMMED LIGHTING SCENE PRESET RECALLS. CONTRACTOR TO PROVIDE CRESTRON DIMMING PANEL

PROCESSORS AND TOUCH SCREENS TO PROVIDE LIGHTING CONTROL INTENT AS SHOWN IN CONJUNCTION WITH

CRESTRON AUDIO VISUAL SYSTEMS DESIGN AND SPECIFIED BY AUDIO VISUAL DESIGN CONSULTANT, CRESTRON OR

CONTRACTOR TO REFER TO JLLP LIGHTING CONTROL DIAGRAM, AUDIO VISUAL SYSTEM PLANS AND SPECIFICATIONS,

ELECTRICAL ENGINEER CONTROL PLANS AND SPECIFICATIONS TO FULLY COORDINATE ANY CRESTRON SYSTEMS

UNIFICATION IN ORDER TO ILLUMINATE ANT REDUNDANT CRESTRON SYSTEM EQUIPMENT (TOUCH SCREEN FOR EXAMPLE) THAT CAN SERVE BOTH LIGHTING AND AUDIO VISUAL INTERFACE FUNCTIONS.

SEE SPECIALTY LIGHTING CONTROL PLANS AND SPECIFICATIONS.

SHEET KEY NOTES
A
B
2 NOT USED.

LIGHT FIXTURES WITH A CONTROL ZONE ARE TO BE DIMMED/CONTROLLED BY ALL NEW CRESTRON LIGHTING CONTROL SYSTEM.

ALL NEW CRESTRON CAEN-GREEN LIGHT DIMMING SYSTEM TO BE SPECIFIED AND DESIGNED INTO THE PROJECT, ABOUT ONE 5X2

CAEN MLO PANEL ALONG WITH TOUCH SCREEN LIGHTING CONTROL SYSTEM TO BE UNIFIED WITH AV USER INTERFACE AND SIMPLE CRESTRON ROOM LIGHTING CONTROL KEY PADS ALONG WITH ANY OCC/VAC/DAYLIGHT SENSORS AS REQUIRED BY TITLE 24 STANDARDS REFER TO PE.

CONTRACTOR TO AIM, ADJUST, FOCUS, RELAMP, RELENS FIXTURES AS REQUIRED DURING LIGHTING AIMING WORK WITH LIGHTING CONSULTANT. PROVIDE ALL TOOLS, GLOVES, LADDERS, LIFTS, AS REQUIRED, COORDINATE AND SCHEDULE ALL AIMING WITH LIGHTING CONSULTANT AND ALL OTHER TRADES AND OPERATIONS SO ALL FIXTURES ARE ACCESSIBLE. 1 3 EL102: EXTERIOR RATED LINEAR LED STRIP LIGHT TO BE INTEGRATED INSTALLED IN THE GUARDRAIL TO PROVIDE GENERAL LOW LEVEL LIGHTING AT THE EXTERIOR PRE-FUNCTION. J-BOX TO PROVIDE POWER AND CONTROL CIRCUIT TO LED STRIP, AT MAX. 40' RUN. PE TO SUPPLEMENT JLLP CRESTRON LIGHTING CONTROL SYSTEM WITH VAC/OCC/DAYLIGHT AND/OR OTHER SENSORS AS REQUIRED BY TITLE 24 AND SHOWN IN PE DRAWINGS. 3 C OUTDOOR LIGHTING TO COMPLY WITH THE SECTION 17.300.040 OF CULVER CITY MUNICIPAL CODE. (TYP.)
4 NOT USED.
5 CRESTRON KEY PAD LIGHT SWITCHES SUPPLEMENTED WITH LOCAL ROOM LIGHTING CONTROL VAC/OCC/DAYLIGHT SENSORS AS REQUIRED BY TITLE 24.
5 (TYP.)
5 (TYP.)
5 6 J-BOX RESERVES POWER AND CIRCUIT FOR FUTURE PLANTING / LANDSCAPE LIGHTING. PE TO SUPPLEMENT JLLP CRESTRON LIGHTING CONTROL SYSTEM WITH VAC/OCC/DAYLIGHT AND/OR OTHER SENSORS AS REQUIRED BY TITLE 24 AND SHOWN IN PE DRAWINGS.
6 (TYP.)
(TYP.)
NO. DATE DESCRIPTION
06/09/21 50% CONSTRUCTION DOCUMENTS
09/24/21 75% CD (PLAN CHECK SET)
1 SL-8.00
J
AD
S-5
RS-3
S-5
JJ

VIEW RANGE

PRIMARY RANGE
TOP: ASSOC LEVEL (LEVEL 3) OFFSET:7'-6"
CUT PLANE: ASSOC LEVEL (LEVEL 3) OFFSET:4'-0"
BOTTOM: ASSOC LEVEL (LEVEL 3) OFFSET:-1'-6"

VIEW DEPTH
LEVEL: ASSOC LEVEL (LEVEL 3) OFFSET:-1'-6"
-
---
-
---
2 SL-4.01

LCS-EX WALL MOUNTED

CRESTRON TOUCH SCREEN FOR

BOTH EXHIBITION LIGHTING AND

AV SYSTEM INTERFACE REFER TO
AV SYSTEM PLAN.

AVLC-EX
LS-3
J-BOX
3 SL-4.01
1 1
A A
B B
C C
D D
4 4
5 5
EE

4.8 4.8
6 6
2 2

1.9 1.9
C.9 C.9
D.9D.9
D.1D.1
PF-4
EL102
PF-4
EL102
(RAIL LIGHTING APPROX.
52' AT LEVEL 3)
FILE NAME:

CERTIFICATION:
- PROJECT ADDRESS
10858 & 10876 CULVER BLVD.

CULVER CITY, CA 90230
- PROJECT OWNER
- SOILS ENGINEER
SUBSURFACE DESIGNS INC.
12848 FOOTHILL BLVD.

SYLMAR, CA 91342
T: 818-898-1595
- CIVIL ENGINEER
LC ENGINEERING GROUP, INC.
889 PIERCE CT., STE. 101
THOUSAND OAKS, CA 91360
T: 805-497-1244
- LANDSCAPE ARCHITECT

SQLA, INC
2669 SATURN ST
BREA, CA 92821
T: 562-905-0800
- STRUCTURAL ENGINEER

NOUS ENGINEERING
600 WILSHIRE BLVD. SUITE 760
LOS ANGELES, CA 90017
T: 213-627-6687
- MEP

ALFA TECH
510W 6TH STREET, SUITE #1105
LOS ANGELES, CA 90014
- LIGHTING & THEATER CONSULTANT

JOHN LEVY LIGHTING PRODUCTIONS, JLLP
350 S FIGUEROA ST. #127
LOS ANGELES, CA 90071
T: 213-629-9949
- ACOUSTICAL CONSULTANT

NICK ANTONIO ACOUSTICS
4487 COLBATH AVE. #306
SHERMAN OAKS, CA 91423
T: 310-404-1833
- SECURITY CONSULTANT

SISTEMS INTEGRATION
606 S. HILL ST., SUITE #1009
LOS ANGELES, CA 90014
T: 213-623-5584
- SIGNAGE CONSULTANT

ROBERT FITCH DESIGN
1115 S ORANGE GROVE AVE. #1
LOS ANGELES, CA 90019
T: 323-424-3146
- SPECIFICATION CONSULTANT

CG-ASSOCIATES
2626 NAPLES AVE.

VENICE, CA 90291
T: 310-578-5773
ISSUE OR REVISION NOTES:

DRAWING TITLE:

SHEET NO:

DRAWING SCALE:

SHEET SIZE:

PROJECT NO:

DATE STAMP:
24x36
2404 WILSHIRE BLVD. STE. 12D
LOS ANGELES, CA 90057
TEL: 1.213.568.3578
ARCHITECT: BRIAN WICKERSHAM
LIC: CA C-32742 / EXP: 07.31.21
AUX

ARCHITECTURE

NOT FOR CONSTRUCTION
1/8" = 1'-0"
9/22/2021 4:18:57 PM
BIM 360://Creative Community Center/JLLP_Lighting_Wende CCC_R20.rvt SL-2.13

SPECIALTY LIGHTING -
FLOOR PLAN - LEVEL 3
184

CREATIVE

COMMUNITY
CENTER
1/8" = 1'-0"SL-2.13
1 SPECIALTY LIGHTING - FLOOR PLAN - LEVEL 3

THESE DESIGN DRAWINGS REPRESENT VISUAL CONCEPTS AND
SUGGESTIONS ONLY. JLLP INC. IS NOT A LICENSED ENGINEER OR

ARCHITECT OR OTHERWISE QUALIFIED TO DETERMINE WHETHER THE

DESIGN MEETS APPLICABLE STRUCTURAL AND SAFETY STANDARDS OR BUILDING CODE REQUIREMENTS. ACCORDINGLY JLLP DOES NOT ASSUME

RESPONSIBILITY FOR THE STRUCTURAL INTEGRITY OF OR THE BUILDING OR

SAFETY CODE COMPLIANCE OF THE DESIGN OR FOR THE CONSTRUCTION,

RIGGING, HANDLING OR THE USE OF THE ARCHITECTURAL ELEMENTS AND EQUIPMENT DEPICTED OR REQUIRED IN CONNECTION WITH SUCH DESIGN. 1 1
AV-8.00
L1................LIGHT FIXTURE TYPE / INSTANCE QUANTITY A-1..............LIGHTING CONTROL ZONE(WHEN APPLICABLE TO A LIGHTING

CONTROL SYSTEM)
.................................BEAM ANGLES................ (4)0

LIGHT FIXTURE ANNOTATION KEY
....................LIGHT FIXTURE SYMBOL (VARIES)

SHEET GENERAL NOTES
LCS = LIGHTING CONTROL STATION - CRESTRON SCREEN FLUSH WALL MOUNT AT STANDARD SWITCH HEIGHT, TOUCH

SCREEN INTERFACE FULLY PROGRAMMED WITH CUSTOM PROPERTY BRAND LOGOS, COLORS, SCREEN LAYOUTS, TO

PROVIDE ROOM COMBINE/DECOMBINE LIGHTING ZONE FUNCTIONS, MANUAL LIGHTING ZONE CONTROLS AND PREPROGRAMMED LIGHTING SCENE PRESET RECALLS. CONTRACTOR TO PROVIDE CRESTRON DIMMING PANEL

PROCESSORS AND TOUCH SCREENS TO PROVIDE LIGHTING CONTROL INTENT AS SHOWN IN CONJUNCTION WITH

CRESTRON AUDIO VISUAL SYSTEMS DESIGN AND SPECIFIED BY AUDIO VISUAL DESIGN CONSULTANT, CRESTRON OR

CONTRACTOR TO REFER TO JLLP LIGHTING CONTROL DIAGRAM, AUDIO VISUAL SYSTEM PLANS AND SPECIFICATIONS,

ELECTRICAL ENGINEER CONTROL PLANS AND SPECIFICATIONS TO FULLY COORDINATE ANY CRESTRON SYSTEMS

UNIFICATION IN ORDER TO ILLUMINATE ANT REDUNDANT CRESTRON SYSTEM EQUIPMENT (TOUCH SCREEN FOR EXAMPLE) THAT CAN SERVE BOTH LIGHTING AND AUDIO VISUAL INTERFACE FUNCTIONS.

SEE SPECIALTY LIGHTING CONTROL PLANS AND SPECIFICATIONS.

SHEET KEY NOTES
A
B
2 NOT USED.

LIGHT FIXTURES WITH A CONTROL ZONE ARE TO BE DIMMED/CONTROLLED BY ALL NEW CRESTRON LIGHTING CONTROL SYSTEM.

ALL NEW CRESTRON CAEN-GREEN LIGHT DIMMING SYSTEM TO BE SPECIFIED AND DESIGNED INTO THE PROJECT, ABOUT ONE 5X2

CAEN MLO PANEL ALONG WITH TOUCH SCREEN LIGHTING CONTROL SYSTEM TO BE UNIFIED WITH AV USER INTERFACE AND SIMPLE CRESTRON ROOM LIGHTING CONTROL KEY PADS ALONG WITH ANY OCC/VAC/DAYLIGHT SENSORS AS REQUIRED BY TITLE 24 STANDARDS REFER TO PE.

CONTRACTOR TO AIM, ADJUST, FOCUS, RELAMP, RELENS FIXTURES AS REQUIRED DURING LIGHTING AIMING WORK WITH LIGHTING CONSULTANT. PROVIDE ALL TOOLS, GLOVES, LADDERS, LIFTS, AS REQUIRED, COORDINATE AND SCHEDULE ALL AIMING WITH LIGHTING CONSULTANT AND ALL OTHER TRADES AND OPERATIONS SO ALL FIXTURES ARE ACCESSIBLE. 1 3 EL102: EXTERIOR RATED LINEAR LED STRIP LIGHT TO BE INTEGRATED INSTALLED IN THE GUARDRAIL TO PROVIDE GENERAL LOW LEVEL LIGHTING AT THE EXTERIOR PRE-FUNCTION. J-BOX TO PROVIDE POWER AND CONTROL CIRCUIT TO LED STRIP, AT MAX. 40' RUN. PE TO SUPPLEMENT JLLP CRESTRON LIGHTING CONTROL SYSTEM WITH VAC/OCC/DAYLIGHT AND/OR OTHER SENSORS AS REQUIRED BY TITLE 24 AND SHOWN IN PE DRAWINGS. 3 C OUTDOOR LIGHTING TO COMPLY WITH THE SECTION 17.300.040 OF CULVER CITY MUNICIPAL CODE. (TYP.)
4 NOT USED.
5 CRESTRON KEY PAD LIGHT SWITCHES SUPPLEMENTED WITH LOCAL ROOM LIGHTING CONTROL VAC/OCC/DAYLIGHT SENSORS AS REQUIRED BY TITLE 24.
5 (TYP.)
5 (TYP.)
5 6 J-BOX RESERVES POWER AND CIRCUIT FOR FUTURE PLANTING / LANDSCAPE LIGHTING. PE TO SUPPLEMENT JLLP CRESTRON LIGHTING CONTROL SYSTEM WITH VAC/OCC/DAYLIGHT AND/OR OTHER SENSORS AS REQUIRED BY TITLE 24 AND SHOWN IN PE DRAWINGS.
6 (TYP.)
(TYP.)
NO. DATE DESCRIPTION
06/09/21 50% CONSTRUCTION DOCUMENTS
09/24/21 75% CD (PLAN CHECK SET)
1 SL-8.00

PROPOSED LIGHTING

AUX ARCHITECTURE
2021.10.20
66 CULVER CITY COMPREHENSIVE PLAN
J
S-8
JJ
JJ
J
J
J
1 SL-4.01
2 SL-4.01
SL-2.14
2 LS-4
J-BOX
3 SL-4.01
3 3
1 1
A A
B B
C C
D D
4 4
5 5

4.8 4.8
6 6
2 2

1.9 1.9

3.1 3.1
C.9 C.9
D.9D.9
D.1D.1
ST-5
EL105
ST-5
EL105
ST-5
EL105
RF-1
EL102
RF-1
EL102
RF-1
EL102
RF-1
EL102
(RAIL LIGHTING APPROX.
100' AT ROOF FLOOR)
S-8
L109-S
RF-2
L103
RF-3
EL109
1 1
B B
C C
D D
2 2

1.9 1.9
C.9 C.9
D.1D.1
RF-2
L103
ST-1
L116
FILE NAME:

CERTIFICATION:
- PROJECT ADDRESS
10858 & 10876 CULVER BLVD.

CULVER CITY, CA 90230
- PROJECT OWNER
- SOILS ENGINEER
SUBSURFACE DESIGNS INC.
12848 FOOTHILL BLVD.

SYLMAR, CA 91342
T: 818-898-1595
- CIVIL ENGINEER
LC ENGINEERING GROUP, INC.
889 PIERCE CT., STE. 101
THOUSAND OAKS, CA 91360
T: 805-497-1244
- LANDSCAPE ARCHITECT

SQLA, INC
2669 SATURN ST
BREA, CA 92821
T: 562-905-0800
- STRUCTURAL ENGINEER

NOUS ENGINEERING
600 WILSHIRE BLVD. SUITE 760
LOS ANGELES, CA 90017
T: 213-627-6687
- MEP

ALFA TECH
510W 6TH STREET, SUITE #1105
LOS ANGELES, CA 90014
- LIGHTING & THEATER CONSULTANT

JOHN LEVY LIGHTING PRODUCTIONS, JLLP
350 S FIGUEROA ST. #127
LOS ANGELES, CA 90071
T: 213-629-9949
- ACOUSTICAL CONSULTANT

NICK ANTONIO ACOUSTICS
4487 COLBATH AVE. #306
SHERMAN OAKS, CA 91423
T: 310-404-1833
- SECURITY CONSULTANT

SISTEMS INTEGRATION
606 S. HILL ST., SUITE #1009
LOS ANGELES, CA 90014
T: 213-623-5584
- SIGNAGE CONSULTANT

ROBERT FITCH DESIGN
1115 S ORANGE GROVE AVE. #1
LOS ANGELES, CA 90019
T: 323-424-3146
- SPECIFICATION CONSULTANT

CG-ASSOCIATES
2626 NAPLES AVE.

VENICE, CA 90291
T: 310-578-5773
ISSUE OR REVISION NOTES:

DRAWING TITLE:

SHEET NO:

DRAWING SCALE:

SHEET SIZE:

PROJECT NO:

DATE STAMP:
24x36
2404 WILSHIRE BLVD. STE. 12D
LOS ANGELES, CA 90057
TEL: 1.213.568.3578
ARCHITECT: BRIAN WICKERSHAM
LIC: CA C-32742 / EXP: 07.31.21
AUX

ARCHITECTURE

NOT FOR CONSTRUCTION
As indicated
9/22/2021 4:19:00 PM
BIM 360://Creative Community Center/JLLP_Lighting_Wende CCC_R20.rvt SL-2.14

SPECIALTY LIGHTING -

ROOF PLAN
184

CREATIVE

COMMUNITY
CENTER
1/8" = 1'-0"SL-2.14
1 SPECIALTY LIGHTING - ROOF PLAN

SHEET GENERAL NOTES
EL102: EXTERIOR RATED LINEAR LED STRIP LIGHT TO BE INTEGRATED INSTALLED IN THE GUARDRAIL TO PROVIDE GENERAL LOW LEVEL LIGHTING AT THE EXTERIOR PRE-FUNCTION. J-BOX TO PROVIDE POWER AND CONTROL CIRCUIT TO LED STRIP, AT MAX. 40' RUN. PE TO SUPPLEMENT JLLP CRESTRON LIGHTING CONTROL SYSTEM WITH VAC/OCC/DAYLIGHT AND/OR OTHER SENSORS AS REQUIRED BY TITLE 24 AND SHOWN IN PE DRAWINGS.

SHEET KEY NOTES
A
B

THESE DESIGN DRAWINGS REPRESENT VISUAL CONCEPTS AND
SUGGESTIONS ONLY. JLLP INC. IS NOT A LICENSED ENGINEER OR

ARCHITECT OR OTHERWISE QUALIFIED TO DETERMINE WHETHER THE

DESIGN MEETS APPLICABLE STRUCTURAL AND SAFETY STANDARDS OR BUILDING CODE REQUIREMENTS. ACCORDINGLY JLLP DOES NOT ASSUME

RESPONSIBILITY FOR THE STRUCTURAL INTEGRITY OF OR THE BUILDING OR

SAFETY CODE COMPLIANCE OF THE DESIGN OR FOR THE CONSTRUCTION,

RIGGING, HANDLING OR THE USE OF THE ARCHITECTURAL ELEMENTS AND EQUIPMENT DEPICTED OR REQUIRED IN CONNECTION WITH SUCH DESIGN. 3 J-BOX RESERVES POWER AND CIRCUIT FOR FUTURE PLANTING / LANDSCAPE LIGHTING. PE TO SUPPLEMENT JLLP CRESTRON LIGHTING CONTROL SYSTEM WITH VAC/OCC/DAYLIGHT AND/OR OTHER SENSORS AS REQUIRED BY TITLE 24 AND SHOWN IN PE DRAWINGS.

LIGHT FIXTURES WITH A CONTROL ZONE ARE TO BE DIMMED/CONTROLLED BY ALL NEW CRESTRON LIGHTING CONTROL SYSTEM.

ALL NEW CRESTRON CAEN-GREEN LIGHT DIMMING SYSTEM TO BE SPECIFIED AND DESIGNED INTO THE PROJECT, ABOUT ONE 5X2

CAEN MLO PANEL ALONG WITH TOUCH SCREEN LIGHTING CONTROL SYSTEM TO BE UNIFIED WITH AV USER INTERFACE AND

SIMPLE CRESTRON ROOM LIGHTING CONTROL KEY PADS ALONG WITH ANY OCC/VAC/DAYLIGHT SENSORS AS REQUIRED BY TITLE 24 STANDARDS REFER TO PE.

CONTRACTOR TO AIM, ADJUST, FOCUS, RELAMP, RELENS FIXTURES AS REQUIRED DURING LIGHTING AIMING WORK WITH LIGHTING CONSULTANT. PROVIDE ALL TOOLS, GLOVES, LADDERS, LIFTS, AS REQUIRED, COORDINATE AND SCHEDULE ALL AIMING WITH LIGHTING CONSULTANT AND ALL OTHER TRADES AND OPERATIONS SO ALL FIXTURES ARE ACCESSIBLE. 1 L1................LIGHT FIXTURE TYPE / INSTANCE QUANTITY A-1..............LIGHTING CONTROL ZONE(WHEN APPLICABLE TO A LIGHTING

CONTROL SYSTEM)
.................................BEAM ANGLES................ (4)0

LIGHT FIXTURE ANNOTATION KEY
....................LIGHT FIXTURE SYMBOL (VARIES)
3 EL109: EXTERIOR RATED WALL SURFACE MOUNTED LIGHT PAD AT 7'-6" AFF TO PROVIDE GENERAL LIGHTING FOR THE ROOF ELEVATOR EXIT AREA. PE TO SUPPLEMENT JLLP CRESTRON LIGHTING CONTROL SYSTEM WITH VAC/OCC/DAYLIGHT AND/OR OTHER SENSORS AS REQUIRED BY TITLE 24 AND SHOWN IN PE DRAWINGS. 2 C OUTDOOR LIGHTING TO COMPLY WITH THE SECTION 17.300.040 OF CULVER CITY MUNICIPAL CODE. (TYP.)
1 (TYP.)
ALLOW FOR 4X20A 120V GFCI AT ROOF
TOP FOR AUXILIARY EVENT POWER.
4 EL105: EXTERIOR RATED MINIATURE LINEAR LED STRIP LIGHT TO BE INTEGRATED INSTALLED IN THE HANDRAILS, ALL FIXTURE, WIRING AND DRIVER BOXES TO BE CONCEALED FROM PUBLIC VIEW. CONTRACTOR TO COORDINATE WITH

LIGHT RAIL MANUFACTURER TO PROVIDE FULLY COMPLETE SHOP DRAWINGS FOR DESIGN TEAM REVIEW AND APPROVAL. PE TO SUPPLEMENT JLLP CRESTRON LIGHTING CONTROL SYSTEM WITH VAC/OCC/DAYLIGHT AND/OR OTHER SENSORS AS REQUIRED BY TITLE 24 AND SHOWN IN PE DRAWINGS. 1/4" = 1'-0"SL-2.14
2 SPECIALTY LIGHTING - ROOF MECH. AND STORAGE - CEILINGS 4 (TYP.)
5 L109-S: CEILING SURFACE MOUNT DIMMABLE 4'x2' LED LIGHT TROFFER TO BE INSTALLED AT STORAGE ROOM. PE TO

SUPPLEMENT JLLP CRESTRON LIGHTING CONTROL SYSTEM WITH VAC/OCC/DAYLIGHT AND/OR OTHER SENSORS AS REQUIRED BY TITLE 24 AND SHOWN IN PE DRAWINGS.
6 CRESTRON KEY PAD LIGHT SWITCHES SUPPLEMENTED WITH LOCAL ROOM LIGHTING CONTROL VAC/OCC/DAYLIGHT SENSORS AS REQUIRED BY TITLE 24.
5 (TYP.)
6 (TYP.)
2 (TYP.)
NO. DATE DESCRIPTION
06/09/21 50% CONSTRUCTION DOCUMENTS
09/24/21 75% CD (PLAN CHECK SET)
7 L103: CEILING RECESSED DOWNLIGHT INSTALL INSIDE THE STORAGE/CABINET, CONNECTED TO DOOR SENSOR, PE TO

SUPPLEMENT JLLP CRESTRON LIGHTING CONTROL SYSTEM WITH VAC/OCC/DAYLIGHT AND/OR OTHER SENSORS AS REQUIRED BY TITLE 24 AND SHOWN IN PE DRAWINGS.
7 (TYP.)
1 (TYP.)
J
S-8
JJ
JJ
J
J
J
1 SL-4.01
2 SL-4.01
SL-2.14
2 LS-4
J-BOX
3 SL-4.01
3 3
1 1
A A
B B
C C
D D
4 4
5 5

4.8 4.8
6 6
2 2

1.9 1.9

3.1 3.1
C.9 C.9
D.9D.9
D.1D.1
ST-5
EL105
ST-5
EL105
ST-5
EL105
RF-1
EL102
RF-1
EL102
RF-1
EL102
RF-1
EL102
(RAIL LIGHTING APPROX.
100' AT ROOF FLOOR)
S-8
L109-S
RF-2
L103
RF-3
EL109
1 1
B B
C C
D D
2 2

1.9 1.9
C.9 C.9
D.1D.1
RF-2
L103
ST-1
L116
FILE NAME:

CERTIFICATION:
- PROJECT ADDRESS
10858 & 10876 CULVER BLVD.

CULVER CITY, CA 90230
- PROJECT OWNER
- SOILS ENGINEER
SUBSURFACE DESIGNS INC.
12848 FOOTHILL BLVD.

SYLMAR, CA 91342
T: 818-898-1595
- CIVIL ENGINEER
LC ENGINEERING GROUP, INC.
889 PIERCE CT., STE. 101
THOUSAND OAKS, CA 91360
T: 805-497-1244
- LANDSCAPE ARCHITECT

SQLA, INC
2669 SATURN ST
BREA, CA 92821
T: 562-905-0800
- STRUCTURAL ENGINEER

NOUS ENGINEERING
600 WILSHIRE BLVD. SUITE 760
LOS ANGELES, CA 90017
T: 213-627-6687
- MEP

ALFA TECH
510W 6TH STREET, SUITE #1105
LOS ANGELES, CA 90014
- LIGHTING & THEATER CONSULTANT

JOHN LEVY LIGHTING PRODUCTIONS, JLLP
350 S FIGUEROA ST. #127
LOS ANGELES, CA 90071
T: 213-629-9949
- ACOUSTICAL CONSULTANT

NICK ANTONIO ACOUSTICS
4487 COLBATH AVE. #306
SHERMAN OAKS, CA 91423
T: 310-404-1833
- SECURITY CONSULTANT

SISTEMS INTEGRATION
606 S. HILL ST., SUITE #1009
LOS ANGELES, CA 90014
T: 213-623-5584
- SIGNAGE CONSULTANT

ROBERT FITCH DESIGN
1115 S ORANGE GROVE AVE. #1
LOS ANGELES, CA 90019
T: 323-424-3146
- SPECIFICATION CONSULTANT

CG-ASSOCIATES
2626 NAPLES AVE.

VENICE, CA 90291
T: 310-578-5773
ISSUE OR REVISION NOTES:

DRAWING TITLE:

SHEET NO:

DRAWING SCALE:

SHEET SIZE:

PROJECT NO:

DATE STAMP:
24x36
2404 WILSHIRE BLVD. STE. 12D
LOS ANGELES, CA 90057
TEL: 1.213.568.3578
ARCHITECT: BRIAN WICKERSHAM
LIC: CA C-32742 / EXP: 07.31.21
AUX

ARCHITECTURE

NOT FOR CONSTRUCTION
As indicated
9/22/2021 4:19:00 PM
BIM 360://Creative Community Center/JLLP_Lighting_Wende CCC_R20.rvt SL-2.14

SPECIALTY LIGHTING -

ROOF PLAN
184

CREATIVE

COMMUNITY
CENTER
1/8" = 1'-0"SL-2.14
1 SPECIALTY LIGHTING - ROOF PLAN

SHEET GENERAL NOTES
EL102: EXTERIOR RATED LINEAR LED STRIP LIGHT TO BE INTEGRATED INSTALLED IN THE GUARDRAIL TO PROVIDE GENERAL LOW LEVEL LIGHTING AT THE EXTERIOR PRE-FUNCTION. J-BOX TO PROVIDE POWER AND CONTROL CIRCUIT TO LED STRIP, AT MAX. 40' RUN. PE TO SUPPLEMENT JLLP CRESTRON LIGHTING CONTROL SYSTEM WITH VAC/OCC/DAYLIGHT AND/OR OTHER SENSORS AS REQUIRED BY TITLE 24 AND SHOWN IN PE DRAWINGS.

SHEET KEY NOTES
A
B

THESE DESIGN DRAWINGS REPRESENT VISUAL CONCEPTS AND
SUGGESTIONS ONLY. JLLP INC. IS NOT A LICENSED ENGINEER OR

ARCHITECT OR OTHERWISE QUALIFIED TO DETERMINE WHETHER THE

DESIGN MEETS APPLICABLE STRUCTURAL AND SAFETY STANDARDS OR BUILDING CODE REQUIREMENTS. ACCORDINGLY JLLP DOES NOT ASSUME

RESPONSIBILITY FOR THE STRUCTURAL INTEGRITY OF OR THE BUILDING OR

SAFETY CODE COMPLIANCE OF THE DESIGN OR FOR THE CONSTRUCTION,

RIGGING, HANDLING OR THE USE OF THE ARCHITECTURAL ELEMENTS AND EQUIPMENT DEPICTED OR REQUIRED IN CONNECTION WITH SUCH DESIGN. 3 J-BOX RESERVES POWER AND CIRCUIT FOR FUTURE PLANTING / LANDSCAPE LIGHTING. PE TO SUPPLEMENT JLLP CRESTRON LIGHTING CONTROL SYSTEM WITH VAC/OCC/DAYLIGHT AND/OR OTHER SENSORS AS REQUIRED BY TITLE 24 AND SHOWN IN PE DRAWINGS.

LIGHT FIXTURES WITH A CONTROL ZONE ARE TO BE DIMMED/CONTROLLED BY ALL NEW CRESTRON LIGHTING CONTROL SYSTEM.

ALL NEW CRESTRON CAEN-GREEN LIGHT DIMMING SYSTEM TO BE SPECIFIED AND DESIGNED INTO THE PROJECT, ABOUT ONE 5X2

CAEN MLO PANEL ALONG WITH TOUCH SCREEN LIGHTING CONTROL SYSTEM TO BE UNIFIED WITH AV USER INTERFACE AND

SIMPLE CRESTRON ROOM LIGHTING CONTROL KEY PADS ALONG WITH ANY OCC/VAC/DAYLIGHT SENSORS AS REQUIRED BY TITLE 24 STANDARDS REFER TO PE.

CONTRACTOR TO AIM, ADJUST, FOCUS, RELAMP, RELENS FIXTURES AS REQUIRED DURING LIGHTING AIMING WORK WITH LIGHTING CONSULTANT. PROVIDE ALL TOOLS, GLOVES, LADDERS, LIFTS, AS REQUIRED, COORDINATE AND SCHEDULE ALL AIMING WITH LIGHTING CONSULTANT AND ALL OTHER TRADES AND OPERATIONS SO ALL FIXTURES ARE ACCESSIBLE. 1 L1................LIGHT FIXTURE TYPE / INSTANCE QUANTITY A-1..............LIGHTING CONTROL ZONE(WHEN APPLICABLE TO A LIGHTING

CONTROL SYSTEM)
.................................BEAM ANGLES................ (4)0

LIGHT FIXTURE ANNOTATION KEY
....................LIGHT FIXTURE SYMBOL (VARIES)
3 EL109: EXTERIOR RATED WALL SURFACE MOUNTED LIGHT PAD AT 7'-6" AFF TO PROVIDE GENERAL LIGHTING FOR THE ROOF ELEVATOR EXIT AREA. PE TO SUPPLEMENT JLLP CRESTRON LIGHTING CONTROL SYSTEM WITH VAC/OCC/DAYLIGHT AND/OR OTHER SENSORS AS REQUIRED BY TITLE 24 AND SHOWN IN PE DRAWINGS. 2 C OUTDOOR LIGHTING TO COMPLY WITH THE SECTION 17.300.040 OF CULVER CITY MUNICIPAL CODE. (TYP.)
1 (TYP.)
ALLOW FOR 4X20A 120V GFCI AT ROOF
TOP FOR AUXILIARY EVENT POWER.
4 EL105: EXTERIOR RATED MINIATURE LINEAR LED STRIP LIGHT TO BE INTEGRATED INSTALLED IN THE HANDRAILS, ALL FIXTURE, WIRING AND DRIVER BOXES TO BE CONCEALED FROM PUBLIC VIEW. CONTRACTOR TO COORDINATE WITH

LIGHT RAIL MANUFACTURER TO PROVIDE FULLY COMPLETE SHOP DRAWINGS FOR DESIGN TEAM REVIEW AND APPROVAL. PE TO SUPPLEMENT JLLP CRESTRON LIGHTING CONTROL SYSTEM WITH VAC/OCC/DAYLIGHT AND/OR OTHER SENSORS AS REQUIRED BY TITLE 24 AND SHOWN IN PE DRAWINGS. 1/4" = 1'-0"SL-2.14
2 SPECIALTY LIGHTING - ROOF MECH. AND STORAGE - CEILINGS 4 (TYP.)
5 L109-S: CEILING SURFACE MOUNT DIMMABLE 4'x2' LED LIGHT TROFFER TO BE INSTALLED AT STORAGE ROOM. PE TO

SUPPLEMENT JLLP CRESTRON LIGHTING CONTROL SYSTEM WITH VAC/OCC/DAYLIGHT AND/OR OTHER SENSORS AS REQUIRED BY TITLE 24 AND SHOWN IN PE DRAWINGS.
6 CRESTRON KEY PAD LIGHT SWITCHES SUPPLEMENTED WITH LOCAL ROOM LIGHTING CONTROL VAC/OCC/DAYLIGHT SENSORS AS REQUIRED BY TITLE 24.
5 (TYP.)
6 (TYP.)
2 (TYP.)
NO. DATE DESCRIPTION
06/09/21 50% CONSTRUCTION DOCUMENTS
09/24/21 75% CD (PLAN CHECK SET)
7 L103: CEILING RECESSED DOWNLIGHT INSTALL INSIDE THE STORAGE/CABINET, CONNECTED TO DOOR SENSOR, PE TO

SUPPLEMENT JLLP CRESTRON LIGHTING CONTROL SYSTEM WITH VAC/OCC/DAYLIGHT AND/OR OTHER SENSORS AS REQUIRED BY TITLE 24 AND SHOWN IN PE DRAWINGS.
7 (TYP.)
1 (TYP.)
J
S-8
JJ
JJ
J
J
J
1 SL-4.01
2 SL-4.01
SL-2.14
2 LS-4
J-BOX
3 SL-4.01
3 3
1 1
A A
B B
C C
D D
4 4
5 5

4.8 4.8
6 6
2 2

1.9 1.9

3.1 3.1
C.9 C.9
D.9D.9
D.1D.1
ST-5
EL105
ST-5
EL105
ST-5
EL105
RF-1
EL102
RF-1
EL102
RF-1
EL102
RF-1
EL102
(RAIL LIGHTING APPROX.
100' AT ROOF FLOOR)
S-8
L109-S
RF-2
L103
RF-3
EL109
1 1
B B
C C
D D
2 2

1.9 1.9
C.9 C.9
D.1D.1
RF-2
L103
ST-1
L116
FILE NAME:

CERTIFICATION:
- PROJECT ADDRESS
10858 & 10876 CULVER BLVD.

CULVER CITY, CA 90230
- PROJECT OWNER
- SOILS ENGINEER
SUBSURFACE DESIGNS INC.
12848 FOOTHILL BLVD.

SYLMAR, CA 91342
T: 818-898-1595
- CIVIL ENGINEER
LC ENGINEERING GROUP, INC.
889 PIERCE CT., STE. 101
THOUSAND OAKS, CA 91360
T: 805-497-1244
- LANDSCAPE ARCHITECT

SQLA, INC
2669 SATURN ST
BREA, CA 92821
T: 562-905-0800
- STRUCTURAL ENGINEER

NOUS ENGINEERING
600 WILSHIRE BLVD. SUITE 760
LOS ANGELES, CA 90017
T: 213-627-6687
- MEP

ALFA TECH
510W 6TH STREET, SUITE #1105
LOS ANGELES, CA 90014
- LIGHTING & THEATER CONSULTANT

JOHN LEVY LIGHTING PRODUCTIONS, JLLP
350 S FIGUEROA ST. #127
LOS ANGELES, CA 90071
T: 213-629-9949
- ACOUSTICAL CONSULTANT

NICK ANTONIO ACOUSTICS
4487 COLBATH AVE. #306
SHERMAN OAKS, CA 91423
T: 310-404-1833
- SECURITY CONSULTANT

SISTEMS INTEGRATION
606 S. HILL ST., SUITE #1009
LOS ANGELES, CA 90014
T: 213-623-5584
- SIGNAGE CONSULTANT

ROBERT FITCH DESIGN
1115 S ORANGE GROVE AVE. #1
LOS ANGELES, CA 90019
T: 323-424-3146
- SPECIFICATION CONSULTANT

CG-ASSOCIATES
2626 NAPLES AVE.

VENICE, CA 90291
T: 310-578-5773
ISSUE OR REVISION NOTES:

DRAWING TITLE:

SHEET NO:

DRAWING SCALE:

SHEET SIZE:

PROJECT NO:

DATE STAMP:
24x36
2404 WILSHIRE BLVD. STE. 12D
LOS ANGELES, CA 90057
TEL: 1.213.568.3578
ARCHITECT: BRIAN WICKERSHAM
LIC: CA C-32742 / EXP: 07.31.21
AUX

ARCHITECTURE

NOT FOR CONSTRUCTION
As indicated
9/22/2021 4:19:00 PM
BIM 360://Creative Community Center/JLLP_Lighting_Wende CCC_R20.rvt SL-2.14

SPECIALTY LIGHTING -

ROOF PLAN
184

CREATIVE

COMMUNITY
CENTER
1/8" = 1'-0"SL-2.14
1 SPECIALTY LIGHTING - ROOF PLAN

SHEET GENERAL NOTES
EL102: EXTERIOR RATED LINEAR LED STRIP LIGHT TO BE INTEGRATED INSTALLED IN THE GUARDRAIL TO PROVIDE GENERAL LOW LEVEL LIGHTING AT THE EXTERIOR PRE-FUNCTION. J-BOX TO PROVIDE POWER AND CONTROL CIRCUIT TO LED STRIP, AT MAX. 40' RUN. PE TO SUPPLEMENT JLLP CRESTRON LIGHTING CONTROL SYSTEM WITH VAC/OCC/DAYLIGHT AND/OR OTHER SENSORS AS REQUIRED BY TITLE 24 AND SHOWN IN PE DRAWINGS.

SHEET KEY NOTES
A
B

THESE DESIGN DRAWINGS REPRESENT VISUAL CONCEPTS AND
SUGGESTIONS ONLY. JLLP INC. IS NOT A LICENSED ENGINEER OR

ARCHITECT OR OTHERWISE QUALIFIED TO DETERMINE WHETHER THE

DESIGN MEETS APPLICABLE STRUCTURAL AND SAFETY STANDARDS OR BUILDING CODE REQUIREMENTS. ACCORDINGLY JLLP DOES NOT ASSUME

RESPONSIBILITY FOR THE STRUCTURAL INTEGRITY OF OR THE BUILDING OR

SAFETY CODE COMPLIANCE OF THE DESIGN OR FOR THE CONSTRUCTION,

RIGGING, HANDLING OR THE USE OF THE ARCHITECTURAL ELEMENTS AND EQUIPMENT DEPICTED OR REQUIRED IN CONNECTION WITH SUCH DESIGN. 3 J-BOX RESERVES POWER AND CIRCUIT FOR FUTURE PLANTING / LANDSCAPE LIGHTING. PE TO SUPPLEMENT JLLP CRESTRON LIGHTING CONTROL SYSTEM WITH VAC/OCC/DAYLIGHT AND/OR OTHER SENSORS AS REQUIRED BY TITLE 24 AND SHOWN IN PE DRAWINGS.

LIGHT FIXTURES WITH A CONTROL ZONE ARE TO BE DIMMED/CONTROLLED BY ALL NEW CRESTRON LIGHTING CONTROL SYSTEM.

ALL NEW CRESTRON CAEN-GREEN LIGHT DIMMING SYSTEM TO BE SPECIFIED AND DESIGNED INTO THE PROJECT, ABOUT ONE 5X2

CAEN MLO PANEL ALONG WITH TOUCH SCREEN LIGHTING CONTROL SYSTEM TO BE UNIFIED WITH AV USER INTERFACE AND

SIMPLE CRESTRON ROOM LIGHTING CONTROL KEY PADS ALONG WITH ANY OCC/VAC/DAYLIGHT SENSORS AS REQUIRED BY TITLE 24 STANDARDS REFER TO PE.

CONTRACTOR TO AIM, ADJUST, FOCUS, RELAMP, RELENS FIXTURES AS REQUIRED DURING LIGHTING AIMING WORK WITH LIGHTING CONSULTANT. PROVIDE ALL TOOLS, GLOVES, LADDERS, LIFTS, AS REQUIRED, COORDINATE AND SCHEDULE ALL AIMING WITH LIGHTING CONSULTANT AND ALL OTHER TRADES AND OPERATIONS SO ALL FIXTURES ARE ACCESSIBLE. 1 L1................LIGHT FIXTURE TYPE / INSTANCE QUANTITY A-1..............LIGHTING CONTROL ZONE(WHEN APPLICABLE TO A LIGHTING

CONTROL SYSTEM)
.................................BEAM ANGLES................ (4)0

LIGHT FIXTURE ANNOTATION KEY
....................LIGHT FIXTURE SYMBOL (VARIES)
3 EL109: EXTERIOR RATED WALL SURFACE MOUNTED LIGHT PAD AT 7'-6" AFF TO PROVIDE GENERAL LIGHTING FOR THE ROOF ELEVATOR EXIT AREA. PE TO SUPPLEMENT JLLP CRESTRON LIGHTING CONTROL SYSTEM WITH VAC/OCC/DAYLIGHT AND/OR OTHER SENSORS AS REQUIRED BY TITLE 24 AND SHOWN IN PE DRAWINGS. 2 C OUTDOOR LIGHTING TO COMPLY WITH THE SECTION 17.300.040 OF CULVER CITY MUNICIPAL CODE. (TYP.)
1 (TYP.)
ALLOW FOR 4X20A 120V GFCI AT ROOF
TOP FOR AUXILIARY EVENT POWER.
4 EL105: EXTERIOR RATED MINIATURE LINEAR LED STRIP LIGHT TO BE INTEGRATED INSTALLED IN THE HANDRAILS, ALL FIXTURE, WIRING AND DRIVER BOXES TO BE CONCEALED FROM PUBLIC VIEW. CONTRACTOR TO COORDINATE WITH

LIGHT RAIL MANUFACTURER TO PROVIDE FULLY COMPLETE SHOP DRAWINGS FOR DESIGN TEAM REVIEW AND APPROVAL. PE TO SUPPLEMENT JLLP CRESTRON LIGHTING CONTROL SYSTEM WITH VAC/OCC/DAYLIGHT AND/OR OTHER SENSORS AS REQUIRED BY TITLE 24 AND SHOWN IN PE DRAWINGS. 1/4" = 1'-0"SL-2.14
2 SPECIALTY LIGHTING - ROOF MECH. AND STORAGE - CEILINGS 4 (TYP.)
5 L109-S: CEILING SURFACE MOUNT DIMMABLE 4'x2' LED LIGHT TROFFER TO BE INSTALLED AT STORAGE ROOM. PE TO

SUPPLEMENT JLLP CRESTRON LIGHTING CONTROL SYSTEM WITH VAC/OCC/DAYLIGHT AND/OR OTHER SENSORS AS REQUIRED BY TITLE 24 AND SHOWN IN PE DRAWINGS.
6 CRESTRON KEY PAD LIGHT SWITCHES SUPPLEMENTED WITH LOCAL ROOM LIGHTING CONTROL VAC/OCC/DAYLIGHT SENSORS AS REQUIRED BY TITLE 24.
5 (TYP.)
6 (TYP.)
2 (TYP.)
NO. DATE DESCRIPTION
06/09/21 50% CONSTRUCTION DOCUMENTS
09/24/21 75% CD (PLAN CHECK SET)
7 L103: CEILING RECESSED DOWNLIGHT INSTALL INSIDE THE STORAGE/CABINET, CONNECTED TO DOOR SENSOR, PE TO

SUPPLEMENT JLLP CRESTRON LIGHTING CONTROL SYSTEM WITH VAC/OCC/DAYLIGHT AND/OR OTHER SENSORS AS REQUIRED BY TITLE 24 AND SHOWN IN PE DRAWINGS.
7 (TYP.)
1 (TYP.)

PROPOSED LIGHTING

AUX ARCHITECTURE
2021.10.20
67 CULVER CITY COMPREHENSIVE PLAN
J
J
J
JJ
JJ

VIEW RANGE

PRIMARY RANGE
TOP: LEVEL 3 OFFSET:0'-0"
CUT PLANE: ASSOC LEVEL (LEVEL 1) OFFSET:7'-0"
BOTTOM: ASSOC LEVEL (LEVEL 1) OFFSET:7'-0"

VIEW DEPTH
LEVEL: LEVEL 3 OFFSET:0'-0"
1 SL-4.01
RS-1
L106
RS-1
L106
RS-1
L106
RS-1
L106
RS-1
L106
RS-1
L106
RS-2
L106
RS-2
L106
RS-2
L106
RS-2
L106
RS-2
L106 RS-2
L106
RS-2
L106RS-2
L106
RS-1
L106
PF-1
L107
PF-1
L107
PF-1
L107
PF-1
L107
PF-1
L107
PF-1
L107
PF-1
L107
PF-1
L107
PF-1
L107
PF-1
L107
P-2
EL107
P-2
EL107
P-2
EL107
DMX-#
L119 (4'x13)
DMX-#
L119 (4'x13)
P-2
EL107
S-6
L106
S-6
L106
L119: SURFACE MOUNT ON SIDE TO

THROW LIGHT UP TO THE CEILING
52' - 0"
2 SL-4.01
BR-1
L101
PF-1
L107
PF-1
L107
S-6
L106
L119-DE20A 120V
L119-DE20A 120V

TO AVER
DMX(1)
TO AVERDMX(1)
P-3
EL107
PF-1
L107
ST-1
L116
PF-1
L107
S-10
L117
BR-1
L101
BR-1
L101
BR-1
L101
BR-1
L101
BR-2
L101-S
P-3
EL107
S-6
L106
S-6
L106
LB-2
L114
LS-7

JBOX-SIGNAGE
LS-6

JBOX-SIGNAGE
LS-6

JBOX-SIGNAGE
3 3
1 1
A A
B B
C C
D D
4 4
5 5
FF
EE

4.8 4.8
6 6
2 2

1.9 1.9

3.1 3.1
C.9 C.9
D.9D.9
D.1D.1
P-1 & P-4
EL101
P-1 & P-4
EL101
P-1 & P-4
EL101
P-1 & P-4
EL101
P-1 & P-4
EL101
P-1 & P-4
EL101
P-1 & P-4
EL101
ME-1
EL109
ME-1
EL109
ST-2
L117
S-9
L116
(20')
(24" DROP)(30" DROP)
(18" DROP)
(36" DROP)
(36" DROP)
P-1 & P-4
EL101
(24" DROP)
(30" DROP)
(18" DROP)
FILE NAME:

CERTIFICATION:
- PROJECT ADDRESS
10858 & 10876 CULVER BLVD.

CULVER CITY, CA 90230
- PROJECT OWNER
- SOILS ENGINEER
SUBSURFACE DESIGNS INC.
12848 FOOTHILL BLVD.

SYLMAR, CA 91342
T: 818-898-1595
- CIVIL ENGINEER
LC ENGINEERING GROUP, INC.
889 PIERCE CT., STE. 101
THOUSAND OAKS, CA 91360
T: 805-497-1244
- LANDSCAPE ARCHITECT

SQLA, INC
2669 SATURN ST
BREA, CA 92821
T: 562-905-0800
- STRUCTURAL ENGINEER

NOUS ENGINEERING
600 WILSHIRE BLVD. SUITE 760
LOS ANGELES, CA 90017
T: 213-627-6687
- MEP

ALFA TECH
510W 6TH STREET, SUITE #1105
LOS ANGELES, CA 90014
- LIGHTING & THEATER CONSULTANT

JOHN LEVY LIGHTING PRODUCTIONS, JLLP
350 S FIGUEROA ST. #127
LOS ANGELES, CA 90071
T: 213-629-9949
- ACOUSTICAL CONSULTANT

NICK ANTONIO ACOUSTICS
4487 COLBATH AVE. #306
SHERMAN OAKS, CA 91423
T: 310-404-1833
- SECURITY CONSULTANT

SISTEMS INTEGRATION
606 S. HILL ST., SUITE #1009
LOS ANGELES, CA 90014
T: 213-623-5584
- SIGNAGE CONSULTANT

ROBERT FITCH DESIGN
1115 S ORANGE GROVE AVE. #1
LOS ANGELES, CA 90019
T: 323-424-3146
- SPECIFICATION CONSULTANT

CG-ASSOCIATES
2626 NAPLES AVE.

VENICE, CA 90291
T: 310-578-5773
ISSUE OR REVISION NOTES:

DRAWING TITLE:

SHEET NO:

DRAWING SCALE:

SHEET SIZE:

PROJECT NO:

DATE STAMP:
24x36
2404 WILSHIRE BLVD. STE. 12D
LOS ANGELES, CA 90057
TEL: 1.213.568.3578
ARCHITECT: BRIAN WICKERSHAM
LIC: CA C-32742 / EXP: 07.31.21
AUX

ARCHITECTURE

NOT FOR CONSTRUCTION
1/8" = 1'-0"
9/22/2021 5:17:06 PM
BIM 360://Creative Community Center/JLLP_Lighting_Wende CCC_R20.rvt SL-2.21

SPECIALTY LIGHTING -
CEILING PLAN - LEVEL 1
184

CREATIVE

COMMUNITY
CENTER
1/8" = 1'-0"SL-2.21
1 SPECIALTY LIGHTING - CEILING PLAN - LEVEL 1

THESE DESIGN DRAWINGS REPRESENT VISUAL CONCEPTS AND
SUGGESTIONS ONLY. JLLP INC. IS NOT A LICENSED ENGINEER OR

ARCHITECT OR OTHERWISE QUALIFIED TO DETERMINE WHETHER THE

DESIGN MEETS APPLICABLE STRUCTURAL AND SAFETY STANDARDS OR BUILDING CODE REQUIREMENTS. ACCORDINGLY JLLP DOES NOT ASSUME

RESPONSIBILITY FOR THE STRUCTURAL INTEGRITY OF OR THE BUILDING OR

SAFETY CODE COMPLIANCE OF THE DESIGN OR FOR THE CONSTRUCTION,

RIGGING, HANDLING OR THE USE OF THE ARCHITECTURAL ELEMENTS AND EQUIPMENT DEPICTED OR REQUIRED IN CONNECTION WITH SUCH DESIGN.

L1................LIGHT FIXTURE TYPE / INSTANCE QUANTITY A-1..............LIGHTING CONTROL ZONE(WHEN APPLICABLE TO A LIGHTING

CONTROL SYSTEM)
.................................BEAM ANGLES................ (4)0

LIGHT FIXTURE ANNOTATION KEY
....................LIGHT FIXTURE SYMBOL (VARIES)

SHEET GENERAL NOTES
L119: DMX PROGRAMMABLE, RGBW HIGH POWER LINEAR ARCHITECTURAL LIGHT FIXTURE WALL SURFACE MOUNTEED AT

BOTH SIDE WALLS OF THE THEATER TO PROVIDE THEATRICAL AND MULTI-PURPOSE ARCHITECTURAL STYLE ILLUMINATION. FIXTURE TO BE MOUNTED AT APPROX. 9'-5" AFF, ABOVE THE ACOUSTIC PANELS, IN A CONCEALMENT SLOT, SEE DETAIL.

L119-DE: POWER AN DATA SUPPLY FOR COLOR CHANGING LINEAR FIXTURE L119, TO BE INSTALLED ADJACENT TO L119 COLOR CHANGING FIXTURE IN AN ACCESSIBLE LOCATION THAT CONCEALED FROM PUBLIC VIEW.

CONTRACTOR TO VERIFY THE POWER-DATA SUPPLY REQUIREMENTS PER ACTUAL FEILD CONDITIONS, AND PROVIDE THE POWER-DATA SUPPLIES L119-DE AS REQUIRED PER LENGHTS.

FIXTURE TO BE CONTROLLED BY THE DMX CONTROL SYSTEM SHOWN ON AV PLANS. CONTRACTOR TO COORDINATE

WITH THE FIXTURE MANUFACTURER TO PROVIDE FULL AND COMPLETE COLOR CHANGING SYSTEM SHOP DRAWINGS

SHOWING ALL PARTS, PIECES, CABLES, CONTROLLERS, HARDWARE AS REQUIRED FOR DESIGN TEAM REVIEW, COMMENT AND APPROVAL IN A FORMAL SUBMITTAL.

SHEET KEY NOTES
A
B
2 EL107: EXTERIOR RATED CEILING RECESSED, COMMERCIAL GRADE 4" DOWNLIGHT TO BE INSTALLED AT PATIO CEILING TO PROVIDE GENERAL ILLUMINATION. PE TO SUPPLEMENT JLLP CRESTRON LIGHTING CONTROL SYSTEM WITH VAC/OCC/DAYLIGHT AND/OR OTHER SENSORS AS REQUIRED BY TITLE 24 AND SHOWN IN PE DRAWINGS.

LIGHT FIXTURES WITH A CONTROL ZONE ARE TO BE DIMMED/CONTROLLED BY ALL NEW CRESTRON LIGHTING CONTROL SYSTEM.

ALL NEW CRESTRON CAEN-GREEN LIGHT DIMMING SYSTEM TO BE SPECIFIED AND DESIGNED INTO THE PROJECT, ABOUT ONE 5X2

CAEN MLO PANEL ALONG WITH TOUCH SCREEN LIGHTING CONTROL SYSTEM TO BE UNIFIED WITH AV USER INTERFACE AND

SIMPLE CRESTRON ROOM LIGHTING CONTROL KEY PADS ALONG WITH ANY OCC/VAC/DAYLIGHT SENSORS AS REQUIRED BY TITLE 24 STANDARDS REFER TO PE.

CONTRACTOR TO AIM, ADJUST, FOCUS, RELAMP, RELENS FIXTURES AS REQUIRED DURING LIGHTING AIMING WORK WITH LIGHTING CONSULTANT. PROVIDE ALL TOOLS, GLOVES, LADDERS, LIFTS, AS REQUIRED, COORDINATE AND SCHEDULE ALL AIMING WITH LIGHTING CONSULTANT AND ALL OTHER TRADES AND OPERATIONS SO ALL FIXTURES ARE ACCESSIBLE. 1 1
REF
AV-8.00
(CONT.)
23 (TYP.) (TYP.)
4 (TYP.)
3 L106: CEILING RECESSED, COMMERCIAL GRADE 4" DOWNLIGHT TO BE INSTALLED AT RESTROOM CEILING TO PROVIDE GENERAL ILLUMINATION. PE TO SUPPLEMENT JLLP CRESTRON LIGHTING CONTROL SYSTEM WITH VAC/OCC/DAYLIGHT AND/OR OTHER SENSORS AS REQUIRED BY TITLE 24 AND SHOWN IN PE DRAWINGS. 4 L107: DIMMABLE, CEILING RECESSED, COMMERCIAL GRADE 4" DOWNLIGHT TO BE INSTALLED AT PRE-FUNCTION CEILING TO PROVIDE GENERAL ILLUMINATION. PE TO SUPPLEMENT JLLP CRESTRON LIGHTING CONTROL SYSTEM WITH VAC/OCC/DAYLIGHT AND/OR OTHER SENSORS AS REQUIRED BY TITLE 24 AND SHOWN IN PE DRAWINGS. 10 5 L117: DAMP LOCATION RATED CEILING RECESSED, COMMERCIAL GRADE 2" LINEAR DOWNLIGHT, FIXTURE TO BE INSTALLED UNDERNEADTH STAIRS AT THE SLOPED CEILING TO PROVIDE GENERAL STAIRS LIGHTING. PE TO

SUPPLEMENT JLLP CRESTRON LIGHTING CONTROL SYSTEM WITH VAC/OCC/DAYLIGHT AND/OR OTHER SENSORS AS REQUIRED BY TITLE 24 AND SHOWN IN PE DRAWINGS.

L116 INSTALLED UNDERNEATH

THE STAIRS AND STAIRCASE
3 (TYP.)
5 1
SL-4.01
(TYP.)
1 REF
AV-8.00
(CONT.)
6 REF
AV-8.00

THEATRICAL AND ARCHITECTURAL

HOUSE LIGHTING REFER TO AV
PLANS
6 THE FLEXIBLE NON-EMERGENCY HOUSE AND EVENT LIGHTING VIA COLOR CHANGING AND WHITE THEATRICAL FIXTURE

TO BE INSTALLED FROM THE ENTERTAINMENT GRID, FIXTURES TO BE CONTROLLED BY THE THEATRICAL LIGHTING

CONTROL SCREEN AND CONNECTED TO THE CRESTRON CONTROL SYSTEM, WHERE PRESETS CAN BE RECALLED BY THE LCS CONTROL INTERFACE. CONTRACTOR TO VERIFY THE POWER-DATA SUPPLY REQUIREMENTS PER ACTUAL

FEILD CONDITIONS, CONTRACTOR TO PROVIDE FULL AND COMPLETE COLOR CHANGING SYSTEM SHOP DRAWINGS

SHOWING ALL PARTS, PIECES, CABLES, CONTROLLERS, HARDWARE AS REQUIRED FOR DESIGN TEAM REVIEW, COMMENT AND APPROVAL IN A FORMAL SUBMITTAL. PROVIDE FULL AND COMPLETE DMX LIGHTING COLOR CHANGING SYSTEM PROGRAMMING PER SYSTEM SPECS ON CONTROL DIAGRAM. 1 7
3 SL-6.02
EL101 - CEILING SUSPENDED

UP&DOWN LINEAR LIGHTING,

RANDOMLY DROP FROM CEILING
7 EL101: DAMP LOCATION RATED CEILING SUSPENDED LINEAR UP & DOWN LIGHTING, FIXTURE DROP RANDOMLY FROM

THE FINISHED CEILING TO PROVIDE CEILING WASH LIGHT TO THE POP-UP CEILING, AND DOWNLIGHT PORTION TO PROVIDE THE GENERAL LIGHTING TO THE SPACE. PE TO SUPPLEMENT JLLP CRESTRON LIGHTING CONTROL SYSTEM WITH VAC/OCC/DAYLIGHT AND/OR OTHER SENSORS AS REQUIRED BY TITLE 24 AND SHOWN IN PE DRAWINGS. 8 1
SL-6.02
L114 - WALL RECESSED AT 18"
BELOW THE CEILING FINISH.
8 L114: DIMMABLE, WALL RECESSED INDIRECT COVE LIGHT TO BE RECESSED INSTALLED AT WALL ELEVATIONS CONTINUOUSLY, TOP EDGE OF THE FIXTURE SHALL BE 18" BELOW THE FINISHED CEILING TO PROVIDE INDIRECT GENERAL LIGHTING TO THE SPACE. PE TO SUPPLEMENT JLLP CRESTRON LIGHTING CONTROL SYSTEM WITH VAC/OCC/DAYLIGHT AND/OR OTHER SENSORS AS REQUIRED BY TITLE 24 AND SHOWN IN PE DRAWINGS. 2 (TYP.)
NO. DATE DESCRIPTION
06/09/21 50% CONSTRUCTION DOCUMENTS
09/24/21 75% CD (PLAN CHECK SET)
9 J-BOX TO PROVIDE POWER AND CIRCUIT AT SIGNAGE LOCATIONS. PE TO SUPPLEMENT JLLP CRESTRON LIGHTING CONTROL SYSTEM WITH VAC/OCC/DAYLIGHT AND/OR OTHER SENSORS AS REQUIRED BY TITLE 24 AND SHOWN IN PE DRAWINGS.
9 (TYP.)
9 (TYP.)
9 (TYP.)
10 L116: CEILING SURFACE MOUNT, COMMERCIAL GRADE 2" LED LINEAR DOWNLIGHT, FIXTURE TO BE INSTALLED UNDERNEADTH STAIRS AT THE SLOPED CEILING TO PROVIDE GENERAL STAIRS LIGHTING. PE TO SUPPLEMENT JLLP CRESTRON LIGHTING CONTROL SYSTEM WITH VAC/OCC/DAYLIGHT AND/OR OTHER SENSORS AS REQUIRED BY TITLE 24 AND SHOWN IN PE DRAWINGS.
2 SL-6.03
2 SL-6.03
J
J
J
JJ
JJ

VIEW RANGE

PRIMARY RANGE
TOP: LEVEL 3 OFFSET:0'-0"
CUT PLANE: ASSOC LEVEL (LEVEL 1) OFFSET:7'-0"
BOTTOM: ASSOC LEVEL (LEVEL 1) OFFSET:7'-0"

VIEW DEPTH
LEVEL: LEVEL 3 OFFSET:0'-0"
1 SL-4.01
RS-1
L106
RS-1
L106
RS-1
L106
RS-1
L106
RS-1
L106
RS-1
L106
RS-2
L106
RS-2
L106
RS-2
L106
RS-2
L106
RS-2
L106 RS-2
L106
RS-2
L106RS-2
L106
RS-1
L106
PF-1
L107
PF-1
L107
PF-1
L107
PF-1
L107
PF-1
L107
PF-1
L107
PF-1
L107
PF-1
L107
PF-1
L107
PF-1
L107
P-2
EL107
P-2
EL107
P-2
EL107
DMX-#
L119 (4'x13)
DMX-#
L119 (4'x13)
P-2
EL107
S-6
L106
S-6
L106
L119: SURFACE MOUNT ON SIDE TO

THROW LIGHT UP TO THE CEILING
52' - 0"
2 SL-4.01
BR-1
L101
PF-1
L107
PF-1
L107
S-6
L106
L119-DE20A 120V
L119-DE20A 120V

TO AVER
DMX(1)
TO AVERDMX(1)
P-3
EL107
PF-1
L107
ST-1
L116
PF-1
L107
S-10
L117
BR-1
L101
BR-1
L101
BR-1
L101
BR-1
L101
BR-2
L101-S
P-3
EL107
S-6
L106
S-6
L106
LB-2
L114
LS-7

JBOX-SIGNAGE
LS-6

JBOX-SIGNAGE
LS-6

JBOX-SIGNAGE
3 3
1 1
A A
B B
C C
D D
4 4
5 5
FF
EE

4.8 4.8
6 6
2 2

1.9 1.9

3.1 3.1
C.9 C.9
D.9D.9
D.1D.1
P-1 & P-4
EL101
P-1 & P-4
EL101
P-1 & P-4
EL101
P-1 & P-4
EL101
P-1 & P-4
EL101
P-1 & P-4
EL101
P-1 & P-4
EL101
ME-1
EL109
ME-1
EL109
ST-2
L117
S-9
L116
(20')
(24" DROP)(30" DROP)
(18" DROP)
(36" DROP)
(36" DROP)
P-1 & P-4
EL101
(24" DROP)
(30" DROP)
(18" DROP)
FILE NAME:

CERTIFICATION:
- PROJECT ADDRESS
10858 & 10876 CULVER BLVD.

CULVER CITY, CA 90230
- PROJECT OWNER
- SOILS ENGINEER
SUBSURFACE DESIGNS INC.
12848 FOOTHILL BLVD.

SYLMAR, CA 91342
T: 818-898-1595
- CIVIL ENGINEER
LC ENGINEERING GROUP, INC.
889 PIERCE CT., STE. 101
THOUSAND OAKS, CA 91360
T: 805-497-1244
- LANDSCAPE ARCHITECT

SQLA, INC
2669 SATURN ST
BREA, CA 92821
T: 562-905-0800
- STRUCTURAL ENGINEER

NOUS ENGINEERING
600 WILSHIRE BLVD. SUITE 760
LOS ANGELES, CA 90017
T: 213-627-6687
- MEP

ALFA TECH
510W 6TH STREET, SUITE #1105
LOS ANGELES, CA 90014
- LIGHTING & THEATER CONSULTANT

JOHN LEVY LIGHTING PRODUCTIONS, JLLP
350 S FIGUEROA ST. #127
LOS ANGELES, CA 90071
T: 213-629-9949
- ACOUSTICAL CONSULTANT

NICK ANTONIO ACOUSTICS
4487 COLBATH AVE. #306
SHERMAN OAKS, CA 91423
T: 310-404-1833
- SECURITY CONSULTANT

SISTEMS INTEGRATION
606 S. HILL ST., SUITE #1009
LOS ANGELES, CA 90014
T: 213-623-5584
- SIGNAGE CONSULTANT

ROBERT FITCH DESIGN
1115 S ORANGE GROVE AVE. #1
LOS ANGELES, CA 90019
T: 323-424-3146
- SPECIFICATION CONSULTANT

CG-ASSOCIATES
2626 NAPLES AVE.

VENICE, CA 90291
T: 310-578-5773
ISSUE OR REVISION NOTES:

DRAWING TITLE:

SHEET NO:

DRAWING SCALE:

SHEET SIZE:

PROJECT NO:

DATE STAMP:
24x36
2404 WILSHIRE BLVD. STE. 12D
LOS ANGELES, CA 90057
TEL: 1.213.568.3578
ARCHITECT: BRIAN WICKERSHAM
LIC: CA C-32742 / EXP: 07.31.21
AUX

ARCHITECTURE

NOT FOR CONSTRUCTION
1/8" = 1'-0"
9/22/2021 5:17:06 PM
BIM 360://Creative Community Center/JLLP_Lighting_Wende CCC_R20.rvt SL-2.21

SPECIALTY LIGHTING -
CEILING PLAN - LEVEL 1
184

CREATIVE

COMMUNITY
CENTER
1/8" = 1'-0"SL-2.21
1 SPECIALTY LIGHTING - CEILING PLAN - LEVEL 1

THESE DESIGN DRAWINGS REPRESENT VISUAL CONCEPTS AND
SUGGESTIONS ONLY. JLLP INC. IS NOT A LICENSED ENGINEER OR

ARCHITECT OR OTHERWISE QUALIFIED TO DETERMINE WHETHER THE

DESIGN MEETS APPLICABLE STRUCTURAL AND SAFETY STANDARDS OR BUILDING CODE REQUIREMENTS. ACCORDINGLY JLLP DOES NOT ASSUME

RESPONSIBILITY FOR THE STRUCTURAL INTEGRITY OF OR THE BUILDING OR

SAFETY CODE COMPLIANCE OF THE DESIGN OR FOR THE CONSTRUCTION,

RIGGING, HANDLING OR THE USE OF THE ARCHITECTURAL ELEMENTS AND EQUIPMENT DEPICTED OR REQUIRED IN CONNECTION WITH SUCH DESIGN.

L1................LIGHT FIXTURE TYPE / INSTANCE QUANTITY A-1..............LIGHTING CONTROL ZONE(WHEN APPLICABLE TO A LIGHTING

CONTROL SYSTEM)
.................................BEAM ANGLES................ (4)0

LIGHT FIXTURE ANNOTATION KEY
....................LIGHT FIXTURE SYMBOL (VARIES)

SHEET GENERAL NOTES
L119: DMX PROGRAMMABLE, RGBW HIGH POWER LINEAR ARCHITECTURAL LIGHT FIXTURE WALL SURFACE MOUNTEED AT

BOTH SIDE WALLS OF THE THEATER TO PROVIDE THEATRICAL AND MULTI-PURPOSE ARCHITECTURAL STYLE ILLUMINATION. FIXTURE TO BE MOUNTED AT APPROX. 9'-5" AFF, ABOVE THE ACOUSTIC PANELS, IN A CONCEALMENT SLOT, SEE DETAIL.

L119-DE: POWER AN DATA SUPPLY FOR COLOR CHANGING LINEAR FIXTURE L119, TO BE INSTALLED ADJACENT TO L119 COLOR CHANGING FIXTURE IN AN ACCESSIBLE LOCATION THAT CONCEALED FROM PUBLIC VIEW.

CONTRACTOR TO VERIFY THE POWER-DATA SUPPLY REQUIREMENTS PER ACTUAL FEILD CONDITIONS, AND PROVIDE THE POWER-DATA SUPPLIES L119-DE AS REQUIRED PER LENGHTS.

FIXTURE TO BE CONTROLLED BY THE DMX CONTROL SYSTEM SHOWN ON AV PLANS. CONTRACTOR TO COORDINATE

WITH THE FIXTURE MANUFACTURER TO PROVIDE FULL AND COMPLETE COLOR CHANGING SYSTEM SHOP DRAWINGS

SHOWING ALL PARTS, PIECES, CABLES, CONTROLLERS, HARDWARE AS REQUIRED FOR DESIGN TEAM REVIEW, COMMENT AND APPROVAL IN A FORMAL SUBMITTAL.

SHEET KEY NOTES
A
B
2 EL107: EXTERIOR RATED CEILING RECESSED, COMMERCIAL GRADE 4" DOWNLIGHT TO BE INSTALLED AT PATIO CEILING TO PROVIDE GENERAL ILLUMINATION. PE TO SUPPLEMENT JLLP CRESTRON LIGHTING CONTROL SYSTEM WITH VAC/OCC/DAYLIGHT AND/OR OTHER SENSORS AS REQUIRED BY TITLE 24 AND SHOWN IN PE DRAWINGS.

LIGHT FIXTURES WITH A CONTROL ZONE ARE TO BE DIMMED/CONTROLLED BY ALL NEW CRESTRON LIGHTING CONTROL SYSTEM.

ALL NEW CRESTRON CAEN-GREEN LIGHT DIMMING SYSTEM TO BE SPECIFIED AND DESIGNED INTO THE PROJECT, ABOUT ONE 5X2

CAEN MLO PANEL ALONG WITH TOUCH SCREEN LIGHTING CONTROL SYSTEM TO BE UNIFIED WITH AV USER INTERFACE AND

SIMPLE CRESTRON ROOM LIGHTING CONTROL KEY PADS ALONG WITH ANY OCC/VAC/DAYLIGHT SENSORS AS REQUIRED BY TITLE 24 STANDARDS REFER TO PE.

CONTRACTOR TO AIM, ADJUST, FOCUS, RELAMP, RELENS FIXTURES AS REQUIRED DURING LIGHTING AIMING WORK WITH LIGHTING CONSULTANT. PROVIDE ALL TOOLS, GLOVES, LADDERS, LIFTS, AS REQUIRED, COORDINATE AND SCHEDULE ALL AIMING WITH LIGHTING CONSULTANT AND ALL OTHER TRADES AND OPERATIONS SO ALL FIXTURES ARE ACCESSIBLE. 1 1
REF
AV-8.00
(CONT.)
23 (TYP.) (TYP.)
4 (TYP.)
3 L106: CEILING RECESSED, COMMERCIAL GRADE 4" DOWNLIGHT TO BE INSTALLED AT RESTROOM CEILING TO PROVIDE GENERAL ILLUMINATION. PE TO SUPPLEMENT JLLP CRESTRON LIGHTING CONTROL SYSTEM WITH VAC/OCC/DAYLIGHT AND/OR OTHER SENSORS AS REQUIRED BY TITLE 24 AND SHOWN IN PE DRAWINGS. 4 L107: DIMMABLE, CEILING RECESSED, COMMERCIAL GRADE 4" DOWNLIGHT TO BE INSTALLED AT PRE-FUNCTION CEILING TO PROVIDE GENERAL ILLUMINATION. PE TO SUPPLEMENT JLLP CRESTRON LIGHTING CONTROL SYSTEM WITH VAC/OCC/DAYLIGHT AND/OR OTHER SENSORS AS REQUIRED BY TITLE 24 AND SHOWN IN PE DRAWINGS. 10 5 L117: DAMP LOCATION RATED CEILING RECESSED, COMMERCIAL GRADE 2" LINEAR DOWNLIGHT, FIXTURE TO BE INSTALLED UNDERNEADTH STAIRS AT THE SLOPED CEILING TO PROVIDE GENERAL STAIRS LIGHTING. PE TO

SUPPLEMENT JLLP CRESTRON LIGHTING CONTROL SYSTEM WITH VAC/OCC/DAYLIGHT AND/OR OTHER SENSORS AS REQUIRED BY TITLE 24 AND SHOWN IN PE DRAWINGS.

L116 INSTALLED UNDERNEATH

THE STAIRS AND STAIRCASE
3 (TYP.)
5 1
SL-4.01
(TYP.)
1 REF
AV-8.00
(CONT.)
6 REF
AV-8.00

THEATRICAL AND ARCHITECTURAL

HOUSE LIGHTING REFER TO AV
PLANS
6 THE FLEXIBLE NON-EMERGENCY HOUSE AND EVENT LIGHTING VIA COLOR CHANGING AND WHITE THEATRICAL FIXTURE

TO BE INSTALLED FROM THE ENTERTAINMENT GRID, FIXTURES TO BE CONTROLLED BY THE THEATRICAL LIGHTING

CONTROL SCREEN AND CONNECTED TO THE CRESTRON CONTROL SYSTEM, WHERE PRESETS CAN BE RECALLED BY THE LCS CONTROL INTERFACE. CONTRACTOR TO VERIFY THE POWER-DATA SUPPLY REQUIREMENTS PER ACTUAL

FEILD CONDITIONS, CONTRACTOR TO PROVIDE FULL AND COMPLETE COLOR CHANGING SYSTEM SHOP DRAWINGS

SHOWING ALL PARTS, PIECES, CABLES, CONTROLLERS, HARDWARE AS REQUIRED FOR DESIGN TEAM REVIEW, COMMENT AND APPROVAL IN A FORMAL SUBMITTAL. PROVIDE FULL AND COMPLETE DMX LIGHTING COLOR CHANGING SYSTEM PROGRAMMING PER SYSTEM SPECS ON CONTROL DIAGRAM. 1 7
3 SL-6.02
EL101 - CEILING SUSPENDED

UP&DOWN LINEAR LIGHTING,

RANDOMLY DROP FROM CEILING
7 EL101: DAMP LOCATION RATED CEILING SUSPENDED LINEAR UP & DOWN LIGHTING, FIXTURE DROP RANDOMLY FROM

THE FINISHED CEILING TO PROVIDE CEILING WASH LIGHT TO THE POP-UP CEILING, AND DOWNLIGHT PORTION TO PROVIDE THE GENERAL LIGHTING TO THE SPACE. PE TO SUPPLEMENT JLLP CRESTRON LIGHTING CONTROL SYSTEM WITH VAC/OCC/DAYLIGHT AND/OR OTHER SENSORS AS REQUIRED BY TITLE 24 AND SHOWN IN PE DRAWINGS. 8 1
SL-6.02
L114 - WALL RECESSED AT 18"
BELOW THE CEILING FINISH.
8 L114: DIMMABLE, WALL RECESSED INDIRECT COVE LIGHT TO BE RECESSED INSTALLED AT WALL ELEVATIONS CONTINUOUSLY, TOP EDGE OF THE FIXTURE SHALL BE 18" BELOW THE FINISHED CEILING TO PROVIDE INDIRECT GENERAL LIGHTING TO THE SPACE. PE TO SUPPLEMENT JLLP CRESTRON LIGHTING CONTROL SYSTEM WITH VAC/OCC/DAYLIGHT AND/OR OTHER SENSORS AS REQUIRED BY TITLE 24 AND SHOWN IN PE DRAWINGS. 2 (TYP.)
NO. DATE DESCRIPTION
06/09/21 50% CONSTRUCTION DOCUMENTS
09/24/21 75% CD (PLAN CHECK SET)
9 J-BOX TO PROVIDE POWER AND CIRCUIT AT SIGNAGE LOCATIONS. PE TO SUPPLEMENT JLLP CRESTRON LIGHTING CONTROL SYSTEM WITH VAC/OCC/DAYLIGHT AND/OR OTHER SENSORS AS REQUIRED BY TITLE 24 AND SHOWN IN PE DRAWINGS.
9 (TYP.)
9 (TYP.)
9 (TYP.)
10 L116: CEILING SURFACE MOUNT, COMMERCIAL GRADE 2" LED LINEAR DOWNLIGHT, FIXTURE TO BE INSTALLED UNDERNEADTH STAIRS AT THE SLOPED CEILING TO PROVIDE GENERAL STAIRS LIGHTING. PE TO SUPPLEMENT JLLP CRESTRON LIGHTING CONTROL SYSTEM WITH VAC/OCC/DAYLIGHT AND/OR OTHER SENSORS AS REQUIRED BY TITLE 24 AND SHOWN IN PE DRAWINGS.
2 SL-6.03
2 SL-6.03

PROPOSED LIGHTING

AUX ARCHITECTURE
2021.10.20
68 CULVER CITY COMPREHENSIVE PLAN

VIEW RANGE

PRIMARY RANGE
TOP: LEVEL ABOVE (LEVEL 3) OFFSET:0'-0"
CUT PLANE: ASSOC LEVEL (LEVEL 2) OFFSET:7'-6"
BOTTOM: ASSOC LEVEL (LEVEL 2) OFFSET:7'-6"

VIEW DEPTH
LEVEL: LEVEL ABOVE (LEVEL 3) OFFSET:0'-0"
S-1
L108
S-1
L108
S-1
L108
1 SL-4.01
S-1
L108
S-2
L109-S
2 SL-4.01
S-2
L109-S
ST-1
L116
DMX-#
EL100TO AVER
DMX(1)
EL100-JBOX
ST-2
L117
PF-3
L100
DMX-#
EL100
DMX-#
EL100

TO AVER
DMX(1)
EL100-JBOX

TO AVER
DMX(1)
3 SL-4.01
3 3
1 1
A A
B B
C C
D D
4 4
5 5
EE

4.8 4.8
6 6
2 2

1.9 1.9

3.1 3.1
C.9 C.9
D.9D.9
D.1D.1
EL100-JBOX
PF-3
L100
PF-3
L100
DMX-#
EL100(20')
DMX-#
EL100(18')
DMX-#
EL100(15')
(9')
CR-2
L110-TL
CR-1
L110-TH
(10')
(33')
L110-T
CR-3
L111
CR-3
L111
CR-3
L111
CR-3
L111
CR-3
L111
CR-3
L111
CR-3
L111
CR-3
L111
ST-1
L116
ST-1
L116
CR-2
L110-TL
CR-1
L110-TH L110-T
FILE NAME:

CERTIFICATION:
- PROJECT ADDRESS
10858 & 10876 CULVER BLVD.

CULVER CITY, CA 90230
- PROJECT OWNER
- SOILS ENGINEER
SUBSURFACE DESIGNS INC.
12848 FOOTHILL BLVD.

SYLMAR, CA 91342
T: 818-898-1595
- CIVIL ENGINEER
LC ENGINEERING GROUP, INC.
889 PIERCE CT., STE. 101
THOUSAND OAKS, CA 91360
T: 805-497-1244
- LANDSCAPE ARCHITECT

SQLA, INC
2669 SATURN ST
BREA, CA 92821
T: 562-905-0800
- STRUCTURAL ENGINEER

NOUS ENGINEERING
600 WILSHIRE BLVD. SUITE 760
LOS ANGELES, CA 90017
T: 213-627-6687
- MEP

ALFA TECH
510W 6TH STREET, SUITE #1105
LOS ANGELES, CA 90014
- LIGHTING & THEATER CONSULTANT

JOHN LEVY LIGHTING PRODUCTIONS, JLLP
350 S FIGUEROA ST. #127
LOS ANGELES, CA 90071
T: 213-629-9949
- ACOUSTICAL CONSULTANT

NICK ANTONIO ACOUSTICS
4487 COLBATH AVE. #306
SHERMAN OAKS, CA 91423
T: 310-404-1833
- SECURITY CONSULTANT

SISTEMS INTEGRATION
606 S. HILL ST., SUITE #1009
LOS ANGELES, CA 90014
T: 213-623-5584
- SIGNAGE CONSULTANT

ROBERT FITCH DESIGN
1115 S ORANGE GROVE AVE. #1
LOS ANGELES, CA 90019
T: 323-424-3146
- SPECIFICATION CONSULTANT

CG-ASSOCIATES
2626 NAPLES AVE.

VENICE, CA 90291
T: 310-578-5773
ISSUE OR REVISION NOTES:

DRAWING TITLE:

SHEET NO:

DRAWING SCALE:

SHEET SIZE:

PROJECT NO:

DATE STAMP:
24x36
2404 WILSHIRE BLVD. STE. 12D
LOS ANGELES, CA 90057
TEL: 1.213.568.3578
ARCHITECT: BRIAN WICKERSHAM
LIC: CA C-32742 / EXP: 07.31.21
AUX

ARCHITECTURE

NOT FOR CONSTRUCTION
1/8" = 1'-0"
9/22/2021 4:19:09 PM
BIM 360://Creative Community Center/JLLP_Lighting_Wende CCC_R20.rvt SL-2.22

SPECIALTY LIGHTING -
CEILING PLAN - LEVEL 2
184

CREATIVE

COMMUNITY
CENTER
1/8" = 1'-0"SL-2.22
1 SPECIALTY LIGHTING - CEILING PLAN - LEVEL 2

THESE DESIGN DRAWINGS REPRESENT VISUAL CONCEPTS AND
SUGGESTIONS ONLY. JLLP INC. IS NOT A LICENSED ENGINEER OR

ARCHITECT OR OTHERWISE QUALIFIED TO DETERMINE WHETHER THE

DESIGN MEETS APPLICABLE STRUCTURAL AND SAFETY STANDARDS OR BUILDING CODE REQUIREMENTS. ACCORDINGLY JLLP DOES NOT ASSUME

RESPONSIBILITY FOR THE STRUCTURAL INTEGRITY OF OR THE BUILDING OR

SAFETY CODE COMPLIANCE OF THE DESIGN OR FOR THE CONSTRUCTION,

RIGGING, HANDLING OR THE USE OF THE ARCHITECTURAL ELEMENTS AND EQUIPMENT DEPICTED OR REQUIRED IN CONNECTION WITH SUCH DESIGN.

L1................LIGHT FIXTURE TYPE / INSTANCE QUANTITY A-1..............LIGHTING CONTROL ZONE(WHEN APPLICABLE TO A LIGHTING

CONTROL SYSTEM)
.................................BEAM ANGLES................ (4)0

LIGHT FIXTURE ANNOTATION KEY
....................LIGHT FIXTURE SYMBOL (VARIES)

SHEET GENERAL NOTES
EL100: DMX CONTROLLED, EXTERIOR RATED, RGBW COLOR CHANGING HIGH POWER LINEAR LED LIGHT FIXTURE, SURFACE MOUNT INSTALLED 4" OFF THE FACADE BAFFLE FEATURE FOR COLOR CHANGING WALL GRAZE EFFECT. CONTRACTOR TO PROVIDE LIGHTING POWER AS REQUIRED ON EXTERIOR LIGHTING SWITCH CONTROL SYSTEM AS REQUIRED. DMX CABLING IN OUTDOOR-RATED CONDUIT INSTALLED PER FIXTURE INSTALLATION MANUAL. DMX CABLE TO HOME RUN TO AVER DMX LIGHTING CONTROL SYSTEM REFER TO SL-8.01 AND AV-8.00.

EL100-JBOX: THE JUNCTION BOX CONNECTED BETWEEN THE DMX SPLITTER AND THE FIXTURES INSTALLED ADJACENT TO EL100 COLOR CHANGING FIXTURES IN AN ACCESSIBLE LOCATION THAT CONCEALED FROM PUBLIC VIEW, MAXIMUM 80'-0" ARE DAISY CHAINED IN 1 EL100-JBOX. CONTRACTOR TO DETERMINE THE BEST PRACTICE, QUANTITIES AND LOCATIONS OF JUNCTION BOX (EL100-JBOX) DUE TO THE SITE CONDITIONS.

FIXTURE LOCATIONS ARE INDICATIVE ON THIS PLAN, CANOPY AND FACADE DETAILS TO BE COORDINATED WITH ARCHITECT IN CD.

SHEET KEY NOTES
L110-T: LINEAR TRACK LIGHT SECTION SURFACE MOUNT AT THE SOFFIT CEILING, THE TRACK SYSTEM IS COMPATIBLE WITH DIMMABLE TRACK HEADS (L110-TH) AND DIMMABLE LINEAR TRACK LIGHT (L110-TL) TO PROVIDE ARCHITECTURAL SPOT LIGHTING AND GENERAL LIGHTING.
2 LIGHT FIXTURES WITH A CONTROL ZONE ARE TO BE DIMMED/CONTROLLED BY ALL NEW CRESTRON LIGHTING CONTROL SYSTEM.

ALL NEW CRESTRON CAEN-GREEN LIGHT DIMMING SYSTEM TO BE SPECIFIED AND DESIGNED INTO THE PROJECT, ABOUT ONE 5X2 CAEN MLO PANEL ALONG WITH TOUCH SCREEN LIGHTING CONTROL SYSTEM TO BE UNIFIED WITH AV USER INTERFACE AND

SIMPLE CRESTRON ROOM LIGHTING CONTROL KEY PADS ALONG WITH ANY OCC/VAC/DAYLIGHT SENSORS AS REQUIRED BY TITLE 24 STANDARDS REFER TO PE.

CONTRACTOR TO AIM, ADJUST, FOCUS, RELAMP, RELENS FIXTURES AS REQUIRED DURING LIGHTING AIMING WORK WITH LIGHTING CONSULTANT. PROVIDE ALL TOOLS, GLOVES, LADDERS, LIFTS, AS REQUIRED, COORDINATE AND SCHEDULE ALL AIMING WITH LIGHTING CONSULTANT AND ALL OTHER TRADES AND OPERATIONS SO ALL FIXTURES ARE ACCESSIBLE.

A
B
1 1
3 SL-6.02
4 1
SL-4.01
L100: DIMMABLE, WALL RECESSED COVE LIGHT FIXTURE TO BE INSTALLED AT CORRIDOR WALL ELEVATION, TOP EDGE OF THE FIXTURE TO BE 18" BELOW THE FINISHED CEILING TO PROVIDE INDIRECT GENERAL LIGHTING. PE TO SUPPLEMENT JLLP CRESTRON LIGHTING CONTROL SYSTEM WITH VAC/OCC/DAYLIGHT AND/OR OTHER SENSORS AS REQUIRED BY TITLE 24 AND SHOWN IN PE DRAWINGS.
3 L117: DAMP LOCATION RATED CEILING RECESSED, COMMERCIAL GRADE 2" LED LINEAR DOWNLIGHT, FIXTURE TO BE INSTALLED UNDERNEADTH STAIRS AT THE SLOPED CEILING TO PROVIDE GENERAL STAIRS LIGHTING. PE TO SUPPLEMENT JLLP CRESTRON LIGHTING CONTROL SYSTEM WITH VAC/OCC/DAYLIGHT AND/OR OTHER SENSORS AS REQUIRED BY TITLE 24 AND SHOWN IN PE DRAWINGS.
4 5
(TYP.)
L109: CEILING RECESSED DIMMABLE 4'x2' LED LIGHT TROFFER TO BE INSTALLED AT IT/STORAGE ROOM. PE TO SUPPLEMENT JLLP CRESTRON LIGHTING CONTROL SYSTEM WITH VAC/OCC/DAYLIGHT AND/OR OTHER SENSORS AS REQUIRED BY TITLE 24 AND SHOWN IN PE DRAWINGS.
5 6
(TYP.)
L108: CEILING RECESSED DIMMABLE, HIGH POWER LINEAR LED DOWNLIGHT INSTALL AT TUTORIAL ROOM. PE TO SUPPLEMENT JLLP CRESTRON LIGHTING CONTROL SYSTEM WITH VAC/OCC/DAYLIGHT AND/OR OTHER SENSORS AS REQUIRED BY TITLE 24 AND SHOWN IN PE DRAWINGS.
6 7
L116 UNDERNEATH THE STAIRS
3 1
SL-6.02
2 (TYP.)
1 1
SL-6.03
NO. DATE DESCRIPTION
06/09/21 50% CONSTRUCTION DOCUMENTS
09/24/21 75% CD (PLAN CHECK SET)
1 3A
SL-6.02
1 3A
SL-6.02
1 SL-8.01
1 SL-8.01
1 SL-8.01
1 SL-8.01
L116: CEILING SURFACE MOUNT, COMMERCIAL GRADE 2" LED LINEAR DOWNLIGHT, FIXTURE TO BE INSTALLED UNDERNEADTH STAIRS AT THE SLOPED CEILING TO PROVIDE GENERAL STAIRS LIGHTING. PE TO SUPPLEMENT JLLP CRESTRON LIGHTING CONTROL SYSTEM WITH VAC/OCC/DAYLIGHT AND/OR OTHER SENSORS AS REQUIRED BY TITLE 24 AND SHOWN IN PE DRAWINGS. 7 L111: CEILING PENDANT HUNG LED CYLINDER FOR GENERAL LIGHTING. BOTTOM OF FIXTURE TO ALIGN WITH THE BOTTOM OF ADJACENT SUSPENDED SLATS. PE TO SUPPLEMENT JLLP CRESTRON LIGHTING CONTROL SYSTEM WITH VAC/OCC/DAYLIGHT AND/OR OTHER SENSORS AS REQUIRED BY TITLE 24 AND SHOWN IN PE DRAWINGS. 8 8
(TYP)

VIEW RANGE

PRIMARY RANGE
TOP: LEVEL ABOVE (LEVEL 3) OFFSET:0'-0"
CUT PLANE: ASSOC LEVEL (LEVEL 2) OFFSET:7'-6"
BOTTOM: ASSOC LEVEL (LEVEL 2) OFFSET:7'-6"

VIEW DEPTH
LEVEL: LEVEL ABOVE (LEVEL 3) OFFSET:0'-0"
S-1
L108
S-1
L108
S-1
L108
1 SL-4.01
S-1
L108
S-2
L109-S
2 SL-4.01
S-2
L109-S
ST-1
L116
DMX-#
EL100TO AVER
DMX(1)
EL100-JBOX
ST-2
L117
PF-3
L100
DMX-#
EL100
DMX-#
EL100

TO AVER
DMX(1)
EL100-JBOX

TO AVER
DMX(1)
3 SL-4.01
3 3
1 1
A A
B B
C C
D D
4 4
5 5
EE

4.8 4.8
6 6
2 2

1.9 1.9

3.1 3.1
C.9 C.9
D.9D.9
D.1D.1
EL100-JBOX
PF-3
L100
PF-3
L100
DMX-#
EL100(20')
DMX-#
EL100(18')
DMX-#
EL100(15')
(9')
CR-2
L110-TL
CR-1
L110-TH
(10')
(33')
L110-T
CR-3
L111
CR-3
L111
CR-3
L111
CR-3
L111
CR-3
L111
CR-3
L111
CR-3
L111
CR-3
L111
ST-1
L116
ST-1
L116
CR-2
L110-TL
CR-1
L110-TH L110-T
FILE NAME:

CERTIFICATION:
- PROJECT ADDRESS
10858 & 10876 CULVER BLVD.

CULVER CITY, CA 90230
- PROJECT OWNER
- SOILS ENGINEER
SUBSURFACE DESIGNS INC.
12848 FOOTHILL BLVD.

SYLMAR, CA 91342
T: 818-898-1595
- CIVIL ENGINEER
LC ENGINEERING GROUP, INC.
889 PIERCE CT., STE. 101
THOUSAND OAKS, CA 91360
T: 805-497-1244
- LANDSCAPE ARCHITECT

SQLA, INC
2669 SATURN ST
BREA, CA 92821
T: 562-905-0800
- STRUCTURAL ENGINEER

NOUS ENGINEERING
600 WILSHIRE BLVD. SUITE 760
LOS ANGELES, CA 90017
T: 213-627-6687
- MEP

ALFA TECH
510W 6TH STREET, SUITE #1105
LOS ANGELES, CA 90014
- LIGHTING & THEATER CONSULTANT

JOHN LEVY LIGHTING PRODUCTIONS, JLLP
350 S FIGUEROA ST. #127
LOS ANGELES, CA 90071
T: 213-629-9949
- ACOUSTICAL CONSULTANT

NICK ANTONIO ACOUSTICS
4487 COLBATH AVE. #306
SHERMAN OAKS, CA 91423
T: 310-404-1833
- SECURITY CONSULTANT

SISTEMS INTEGRATION
606 S. HILL ST., SUITE #1009
LOS ANGELES, CA 90014
T: 213-623-5584
- SIGNAGE CONSULTANT

ROBERT FITCH DESIGN
1115 S ORANGE GROVE AVE. #1
LOS ANGELES, CA 90019
T: 323-424-3146
- SPECIFICATION CONSULTANT

CG-ASSOCIATES
2626 NAPLES AVE.

VENICE, CA 90291
T: 310-578-5773
ISSUE OR REVISION NOTES:

DRAWING TITLE:

SHEET NO:

DRAWING SCALE:

SHEET SIZE:

PROJECT NO:

DATE STAMP:
24x36
2404 WILSHIRE BLVD. STE. 12D
LOS ANGELES, CA 90057
TEL: 1.213.568.3578
ARCHITECT: BRIAN WICKERSHAM
LIC: CA C-32742 / EXP: 07.31.21
AUX

ARCHITECTURE

NOT FOR CONSTRUCTION
1/8" = 1'-0"
9/22/2021 4:19:09 PM
BIM 360://Creative Community Center/JLLP_Lighting_Wende CCC_R20.rvt SL-2.22

SPECIALTY LIGHTING -
CEILING PLAN - LEVEL 2
184

CREATIVE

COMMUNITY
CENTER
1/8" = 1'-0"SL-2.22
1 SPECIALTY LIGHTING - CEILING PLAN - LEVEL 2

THESE DESIGN DRAWINGS REPRESENT VISUAL CONCEPTS AND
SUGGESTIONS ONLY. JLLP INC. IS NOT A LICENSED ENGINEER OR

ARCHITECT OR OTHERWISE QUALIFIED TO DETERMINE WHETHER THE

DESIGN MEETS APPLICABLE STRUCTURAL AND SAFETY STANDARDS OR BUILDING CODE REQUIREMENTS. ACCORDINGLY JLLP DOES NOT ASSUME

RESPONSIBILITY FOR THE STRUCTURAL INTEGRITY OF OR THE BUILDING OR

SAFETY CODE COMPLIANCE OF THE DESIGN OR FOR THE CONSTRUCTION,

RIGGING, HANDLING OR THE USE OF THE ARCHITECTURAL ELEMENTS AND EQUIPMENT DEPICTED OR REQUIRED IN CONNECTION WITH SUCH DESIGN.

L1................LIGHT FIXTURE TYPE / INSTANCE QUANTITY A-1..............LIGHTING CONTROL ZONE(WHEN APPLICABLE TO A LIGHTING

CONTROL SYSTEM)
.................................BEAM ANGLES................ (4)0

LIGHT FIXTURE ANNOTATION KEY
....................LIGHT FIXTURE SYMBOL (VARIES)

SHEET GENERAL NOTES
EL100: DMX CONTROLLED, EXTERIOR RATED, RGBW COLOR CHANGING HIGH POWER LINEAR LED LIGHT FIXTURE, SURFACE MOUNT INSTALLED 4" OFF THE FACADE BAFFLE FEATURE FOR COLOR CHANGING WALL GRAZE EFFECT. CONTRACTOR TO PROVIDE LIGHTING POWER AS REQUIRED ON EXTERIOR LIGHTING SWITCH CONTROL SYSTEM AS REQUIRED. DMX CABLING IN OUTDOOR-RATED CONDUIT INSTALLED PER FIXTURE INSTALLATION MANUAL. DMX CABLE TO HOME RUN TO AVER DMX LIGHTING CONTROL SYSTEM REFER TO SL-8.01 AND AV-8.00.

EL100-JBOX: THE JUNCTION BOX CONNECTED BETWEEN THE DMX SPLITTER AND THE FIXTURES INSTALLED ADJACENT TO EL100 COLOR CHANGING FIXTURES IN AN ACCESSIBLE LOCATION THAT CONCEALED FROM PUBLIC VIEW, MAXIMUM 80'-0" ARE DAISY CHAINED IN 1 EL100-JBOX. CONTRACTOR TO DETERMINE THE BEST PRACTICE, QUANTITIES AND LOCATIONS OF JUNCTION BOX (EL100-JBOX) DUE TO THE SITE CONDITIONS.

FIXTURE LOCATIONS ARE INDICATIVE ON THIS PLAN, CANOPY AND FACADE DETAILS TO BE COORDINATED WITH ARCHITECT IN CD.

SHEET KEY NOTES
L110-T: LINEAR TRACK LIGHT SECTION SURFACE MOUNT AT THE SOFFIT CEILING, THE TRACK SYSTEM IS COMPATIBLE WITH DIMMABLE TRACK HEADS (L110-TH) AND DIMMABLE LINEAR TRACK LIGHT (L110-TL) TO PROVIDE ARCHITECTURAL SPOT LIGHTING AND GENERAL LIGHTING.
2 LIGHT FIXTURES WITH A CONTROL ZONE ARE TO BE DIMMED/CONTROLLED BY ALL NEW CRESTRON LIGHTING CONTROL SYSTEM.

ALL NEW CRESTRON CAEN-GREEN LIGHT DIMMING SYSTEM TO BE SPECIFIED AND DESIGNED INTO THE PROJECT, ABOUT ONE 5X2 CAEN MLO PANEL ALONG WITH TOUCH SCREEN LIGHTING CONTROL SYSTEM TO BE UNIFIED WITH AV USER INTERFACE AND

SIMPLE CRESTRON ROOM LIGHTING CONTROL KEY PADS ALONG WITH ANY OCC/VAC/DAYLIGHT SENSORS AS REQUIRED BY TITLE 24 STANDARDS REFER TO PE.

CONTRACTOR TO AIM, ADJUST, FOCUS, RELAMP, RELENS FIXTURES AS REQUIRED DURING LIGHTING AIMING WORK WITH LIGHTING CONSULTANT. PROVIDE ALL TOOLS, GLOVES, LADDERS, LIFTS, AS REQUIRED, COORDINATE AND SCHEDULE ALL AIMING WITH LIGHTING CONSULTANT AND ALL OTHER TRADES AND OPERATIONS SO ALL FIXTURES ARE ACCESSIBLE.

A
B
1 1
3 SL-6.02
4 1
SL-4.01
L100: DIMMABLE, WALL RECESSED COVE LIGHT FIXTURE TO BE INSTALLED AT CORRIDOR WALL ELEVATION, TOP EDGE OF THE FIXTURE TO BE 18" BELOW THE FINISHED CEILING TO PROVIDE INDIRECT GENERAL LIGHTING. PE TO SUPPLEMENT JLLP CRESTRON LIGHTING CONTROL SYSTEM WITH VAC/OCC/DAYLIGHT AND/OR OTHER SENSORS AS REQUIRED BY TITLE 24 AND SHOWN IN PE DRAWINGS.
3 L117: DAMP LOCATION RATED CEILING RECESSED, COMMERCIAL GRADE 2" LED LINEAR DOWNLIGHT, FIXTURE TO BE INSTALLED UNDERNEADTH STAIRS AT THE SLOPED CEILING TO PROVIDE GENERAL STAIRS LIGHTING. PE TO SUPPLEMENT JLLP CRESTRON LIGHTING CONTROL SYSTEM WITH VAC/OCC/DAYLIGHT AND/OR OTHER SENSORS AS REQUIRED BY TITLE 24 AND SHOWN IN PE DRAWINGS.
4 5
(TYP.)
L109: CEILING RECESSED DIMMABLE 4'x2' LED LIGHT TROFFER TO BE INSTALLED AT IT/STORAGE ROOM. PE TO SUPPLEMENT JLLP CRESTRON LIGHTING CONTROL SYSTEM WITH VAC/OCC/DAYLIGHT AND/OR OTHER SENSORS AS REQUIRED BY TITLE 24 AND SHOWN IN PE DRAWINGS.
5 6
(TYP.)
L108: CEILING RECESSED DIMMABLE, HIGH POWER LINEAR LED DOWNLIGHT INSTALL AT TUTORIAL ROOM. PE TO SUPPLEMENT JLLP CRESTRON LIGHTING CONTROL SYSTEM WITH VAC/OCC/DAYLIGHT AND/OR OTHER SENSORS AS REQUIRED BY TITLE 24 AND SHOWN IN PE DRAWINGS.
6 7
L116 UNDERNEATH THE STAIRS
3 1
SL-6.02
2 (TYP.)
1 1
SL-6.03
NO. DATE DESCRIPTION
06/09/21 50% CONSTRUCTION DOCUMENTS
09/24/21 75% CD (PLAN CHECK SET)
1 3A
SL-6.02
1 3A
SL-6.02
1 SL-8.01
1 SL-8.01
1 SL-8.01
1 SL-8.01
L116: CEILING SURFACE MOUNT, COMMERCIAL GRADE 2" LED LINEAR DOWNLIGHT, FIXTURE TO BE INSTALLED UNDERNEADTH STAIRS AT THE SLOPED CEILING TO PROVIDE GENERAL STAIRS LIGHTING. PE TO SUPPLEMENT JLLP CRESTRON LIGHTING CONTROL SYSTEM WITH VAC/OCC/DAYLIGHT AND/OR OTHER SENSORS AS REQUIRED BY TITLE 24 AND SHOWN IN PE DRAWINGS. 7 L111: CEILING PENDANT HUNG LED CYLINDER FOR GENERAL LIGHTING. BOTTOM OF FIXTURE TO ALIGN WITH THE BOTTOM OF ADJACENT SUSPENDED SLATS. PE TO SUPPLEMENT JLLP CRESTRON LIGHTING CONTROL SYSTEM WITH VAC/OCC/DAYLIGHT AND/OR OTHER SENSORS AS REQUIRED BY TITLE 24 AND SHOWN IN PE DRAWINGS. 8 8
(TYP)

PROPOSED LIGHTING

AUX ARCHITECTURE
2021.10.20
69 CULVER CITY COMPREHENSIVE PLAN
J
J

VIEW RANGE

PRIMARY RANGE
TOP: UNLIMITED OFFSET:0'-0"
CUT PLANE: ASSOC LEVEL (LEVEL 3) OFFSET:7'-6"
BOTTOM: ASSOC LEVEL (LEVEL 3) OFFSET:7'-6"

VIEW DEPTH
LEVEL: UNLIMITED OFFSET:0'-0"
S-5
L109
S-5
L109
RS-3
L106
1 SL-4.01
L110-T EX-1
L110-TH
EX-1
L110-TH
EX-2
L110-TL
L110-T
2 SL-4.01
ST-2
L117
DMX-#
EL100
DS
L102
DMX-#
EL100TO AVER
DMX(1)
EL100-JBOX

TO AVER
DMX(1)
EL100-JBOX
DMX-#
EL100

TO AVER
DMX(1)
EL100-JBOX
3 SL-4.01
3 3
1 1
A A
B B
C C
D D
4 4
5 5
EE

4.8 4.8
6 6
2 2

1.9 1.9

3.1 3.1
C.9 C.9
D.9D.9
D.1D.1
(10')
EX-3
L111
EX-3
L111
EX-3
L111
EX-3
L111EX-3
L111
EX-3
L111
EX-3
L111
EX-3
L111(20')
DMX-#
EL100(12')
S-5
L109
RS-3
L106
RS-3
L106
(36')
DMX-#
EL100 (12')
(12')
PF-5
L100
PF-5
L100
PF-5
L100
PF-5
L100
ST-1
L116
ST-1
L116
L110-T
EX-2
L110-TL
EX-1
L110-TH
EX-2
L110-TL
DMX-#
EL100
FILE NAME:

CERTIFICATION:
- PROJECT ADDRESS
10858 & 10876 CULVER BLVD.

CULVER CITY, CA 90230
- PROJECT OWNER
- SOILS ENGINEER
SUBSURFACE DESIGNS INC.
12848 FOOTHILL BLVD.

SYLMAR, CA 91342
T: 818-898-1595
- CIVIL ENGINEER
LC ENGINEERING GROUP, INC.
889 PIERCE CT., STE. 101
THOUSAND OAKS, CA 91360
T: 805-497-1244
- LANDSCAPE ARCHITECT

SQLA, INC
2669 SATURN ST
BREA, CA 92821
T: 562-905-0800
- STRUCTURAL ENGINEER

NOUS ENGINEERING
600 WILSHIRE BLVD. SUITE 760
LOS ANGELES, CA 90017
T: 213-627-6687
- MEP

ALFA TECH
510W 6TH STREET, SUITE #1105
LOS ANGELES, CA 90014
- LIGHTING & THEATER CONSULTANT

JOHN LEVY LIGHTING PRODUCTIONS, JLLP
350 S FIGUEROA ST. #127
LOS ANGELES, CA 90071
T: 213-629-9949
- ACOUSTICAL CONSULTANT

NICK ANTONIO ACOUSTICS
4487 COLBATH AVE. #306
SHERMAN OAKS, CA 91423
T: 310-404-1833
- SECURITY CONSULTANT

SISTEMS INTEGRATION
606 S. HILL ST., SUITE #1009
LOS ANGELES, CA 90014
T: 213-623-5584
- SIGNAGE CONSULTANT

ROBERT FITCH DESIGN
1115 S ORANGE GROVE AVE. #1
LOS ANGELES, CA 90019
T: 323-424-3146
- SPECIFICATION CONSULTANT

CG-ASSOCIATES
2626 NAPLES AVE.

VENICE, CA 90291
T: 310-578-5773
ISSUE OR REVISION NOTES:

DRAWING TITLE:

SHEET NO:

DRAWING SCALE:

SHEET SIZE:

PROJECT NO:

DATE STAMP:
24x36
2404 WILSHIRE BLVD. STE. 12D
LOS ANGELES, CA 90057
TEL: 1.213.568.3578
ARCHITECT: BRIAN WICKERSHAM
LIC: CA C-32742 / EXP: 07.31.21
AUX

ARCHITECTURE

NOT FOR CONSTRUCTION
1/8" = 1'-0"
9/22/2021 4:19:14 PM
BIM 360://Creative Community Center/JLLP_Lighting_Wende CCC_R20.rvt SL-2.23

SPECIALTY LIGHTING -
CEILING PLAN - LEVEL 3
184

CREATIVE

COMMUNITY
CENTER
1/8" = 1'-0"SL-2.23
1 SPECIALTY LIGHTING - CEILING PLAN - LEVEL 3

THESE DESIGN DRAWINGS REPRESENT VISUAL CONCEPTS AND
SUGGESTIONS ONLY. JLLP INC. IS NOT A LICENSED ENGINEER OR

ARCHITECT OR OTHERWISE QUALIFIED TO DETERMINE WHETHER THE

DESIGN MEETS APPLICABLE STRUCTURAL AND SAFETY STANDARDS OR BUILDING CODE REQUIREMENTS. ACCORDINGLY JLLP DOES NOT ASSUME

RESPONSIBILITY FOR THE STRUCTURAL INTEGRITY OF OR THE BUILDING OR

SAFETY CODE COMPLIANCE OF THE DESIGN OR FOR THE CONSTRUCTION,

RIGGING, HANDLING OR THE USE OF THE ARCHITECTURAL ELEMENTS AND EQUIPMENT DEPICTED OR REQUIRED IN CONNECTION WITH SUCH DESIGN. 1 3
SL-6.02
L1................LIGHT FIXTURE TYPE / INSTANCE QUANTITY A-1..............LIGHTING CONTROL ZONE(WHEN APPLICABLE TO A LIGHTING

CONTROL SYSTEM)
.................................BEAM ANGLES................ (4)0

LIGHT FIXTURE ANNOTATION KEY
....................LIGHT FIXTURE SYMBOL (VARIES)

SHEET GENERAL NOTES
EL100: DMX CONTROLLED, EXTERIOR RATED, RGBW COLOR CHANGING HIGH POWER LINEAR LED LIGHT FIXTURE, SURFACE MOUNT INSTALLED 4" OFF THE FACADE BAFFLE FEATURE FOR COLOR CHANGING WALL GRAZE EFFECT. CONTRACTOR TO PROVIDE LIGHTING POWER AS REQUIRED ON EXTERIOR LIGHTING SWITCH CONTROL SYSTEM AS REQUIRED. DMX CABLING IN OUTDOOR-RATED CONDUIT INSTALLED PER FIXTURE INSTALLATION MANUAL. DMX CABLE TO HOME RUN TO AVER DMX LIGHTING CONTROL SYSTEM REFER TO SL-8.01 AND AV-8.00.

EL100-JBOX: THE JUNCTION BOX CONNECTED BETWEEN THE DMX SPLITTER AND THE FIXTURES INSTALLED ADJACENT TO EL100 COLOR CHANGING FIXTURES IN AN ACCESSIBLE LOCATION THAT CONCEALED FROM PUBLIC VIEW, MAXIMUM 80'-0" ARE DAISY CHAINED IN 1 EL100-JBOX. CONTRACTOR TO DETERMINE THE BEST PRACTICE, QUANTITIES AND LOCATIONS OF JUNCTION BOX (EL100-JBOX) DUE TO THE SITE CONDITIONS.

FIXTURE LOCATIONS ARE INDICATIVE ON THIS PLAN, CANOPY AND FACADE DETAILS TO BE COORDINATED WITH ARCHITECT IN CD.

SHEET KEY NOTES
L110-T: LINEAR TRACK LIGHT SECTION SURFACE MOUNT AT THE SOFFIT CEILING, THE TRACK SYSTEM IS COMPATIBLE WITH DIMMABLE TRACK HEADS (L110-TH) AND DIMMABLE LINEAR TRACK LIGHT (L110-TL) TO PROVIDE ARCHITECTURAL SPOT LIGHTING AND GENERAL LIGHTING.
2 LIGHT FIXTURES WITH A CONTROL ZONE ARE TO BE DIMMED/CONTROLLED BY ALL NEW CRESTRON LIGHTING CONTROL SYSTEM.

ALL NEW CRESTRON CAEN-GREEN LIGHT DIMMING SYSTEM TO BE SPECIFIED AND DESIGNED INTO THE PROJECT, ABOUT ONE 5X2 CAEN MLO PANEL ALONG WITH TOUCH SCREEN LIGHTING CONTROL SYSTEM TO BE UNIFIED WITH AV USER INTERFACE AND

SIMPLE CRESTRON ROOM LIGHTING CONTROL KEY PADS ALONG WITH ANY OCC/VAC/DAYLIGHT SENSORS AS REQUIRED BY TITLE 24 STANDARDS REFER TO PE.

CONTRACTOR TO AIM, ADJUST, FOCUS, RELAMP, RELENS FIXTURES AS REQUIRED DURING LIGHTING AIMING WORK WITH LIGHTING CONSULTANT. PROVIDE ALL TOOLS, GLOVES, LADDERS, LIFTS, AS REQUIRED, COORDINATE AND SCHEDULE ALL AIMING WITH LIGHTING CONSULTANT AND ALL OTHER TRADES AND OPERATIONS SO ALL FIXTURES ARE ACCESSIBLE.

A
B
1 2
5 1
SL-4.01
(TYP.)
L117: DAMP LOCATION RATED CEILING RECESSED, COMMERCIAL GRADE 2" LED LINEAR DOWNLIGHT, FIXTURE TO BE INSTALLED UNDERNEADTH STAIRS AT SLOPED CEILING TO PROVIDE GENERAL STAIRS LIGHTING. PE TO SUPPLEMENT JLLP CRESTRON LIGHTING CONTROL SYSTEM WITH VAC/OCC/DAYLIGHT AND/OR OTHER SENSORS AS REQUIRED BY TITLE 24 AND SHOWN IN PE DRAWINGS.
5 3
(TYP.)
(TYP.)
L109: CEILING RECESSED DIMMABLE 4'x2' LED LIGHT TROFFER TO BE INSTALLED AT IT/STORAGE ROOM. PE TO SUPPLEMENT JLLP CRESTRON LIGHTING CONTROL SYSTEM WITH VAC/OCC/DAYLIGHT AND/OR OTHER SENSORS AS REQUIRED BY TITLE 24 AND SHOWN IN PE DRAWINGS.
3 L100: DIMMABLE, WALL RECESSED COVE LIGHT FIXTURE TO BE INSTALLED CONTINUOUSLY AT CORRIDOR WALL ELEVATION 24" OFF THE CEILING TO PROVIDE INDIRECT GENERAL LIGHTING. PE TO SUPPLEMENT JLLP CRESTRON LIGHTING CONTROL SYSTEM WITH VAC/OCC/DAYLIGHT AND/OR OTHER SENSORS AS REQUIRED BY TITLE 24 AND SHOWN IN PE DRAWINGS. 4 4
1 SL-6.02
(TYP.)
6 (TYP.)
1 3A
SL-6.02
1 SL-8.01
NO. DATE DESCRIPTION
06/09/21 50% CONSTRUCTION DOCUMENTS
09/24/21 75% CD (PLAN CHECK SET)
1 SL-8.01
1 1
SL-6.03
1 SL-8.01
1 1
SL-6.03
1 SL-8.01
L116: CEILING SURFACE MOUNT, COMMERCIAL GRADE 2" LED LINEAR DOWNLIGHT, FIXTURE TO BE INSTALLED UNDERNEADTH STAIRS AT THE SLOPED CEILING TO PROVIDE GENERAL STAIRS LIGHTING. PE TO SUPPLEMENT JLLP CRESTRON LIGHTING CONTROL SYSTEM WITH VAC/OCC/DAYLIGHT AND/OR OTHER SENSORS AS REQUIRED BY TITLE 24 AND SHOWN IN PE DRAWINGS. 6 L111: CEILING PENDANT HUNG LED CYLINDER FOR GENERAL LIGHTING. BOTTOM OF FIXTURE TO ALIGN WITH THE BOTTOM OF ADJACENT SUSPENDED SLATS. PE TO SUPPLEMENT JLLP CRESTRON LIGHTING CONTROL SYSTEM WITH VAC/OCC/DAYLIGHT AND/OR OTHER SENSORS AS REQUIRED BY TITLE 24 AND SHOWN IN PE DRAWINGS. 7 7
(TYP.)
J
J

VIEW RANGE

PRIMARY RANGE
TOP: UNLIMITED OFFSET:0'-0"
CUT PLANE: ASSOC LEVEL (LEVEL 3) OFFSET:7'-6"
BOTTOM: ASSOC LEVEL (LEVEL 3) OFFSET:7'-6"

VIEW DEPTH
LEVEL: UNLIMITED OFFSET:0'-0"
S-5
L109
S-5
L109
RS-3
L106
1 SL-4.01
L110-T EX-1
L110-TH
EX-1
L110-TH
EX-2
L110-TL
L110-T
2 SL-4.01
ST-2
L117
DMX-#
EL100
DS
L102
DMX-#
EL100TO AVER
DMX(1)
EL100-JBOX

TO AVER
DMX(1)
EL100-JBOX
DMX-#
EL100

TO AVER
DMX(1)
EL100-JBOX
3 SL-4.01
3 3
1 1
A A
B B
C C
D D
4 4
5 5
EE

4.8 4.8
6 6
2 2

1.9 1.9

3.1 3.1
C.9 C.9
D.9D.9
D.1D.1
(10')
EX-3
L111
EX-3
L111
EX-3
L111
EX-3
L111EX-3
L111
EX-3
L111
EX-3
L111
EX-3
L111(20')
DMX-#
EL100(12')
S-5
L109
RS-3
L106
RS-3
L106
(36')
DMX-#
EL100 (12')
(12')
PF-5
L100
PF-5
L100
PF-5
L100
PF-5
L100
ST-1
L116
ST-1
L116
L110-T
EX-2
L110-TL
EX-1
L110-TH
EX-2
L110-TL
DMX-#
EL100
FILE NAME:

CERTIFICATION:
- PROJECT ADDRESS
10858 & 10876 CULVER BLVD.

CULVER CITY, CA 90230
- PROJECT OWNER
- SOILS ENGINEER
SUBSURFACE DESIGNS INC.
12848 FOOTHILL BLVD.

SYLMAR, CA 91342
T: 818-898-1595
- CIVIL ENGINEER
LC ENGINEERING GROUP, INC.
889 PIERCE CT., STE. 101
THOUSAND OAKS, CA 91360
T: 805-497-1244
- LANDSCAPE ARCHITECT

SQLA, INC
2669 SATURN ST
BREA, CA 92821
T: 562-905-0800
- STRUCTURAL ENGINEER

NOUS ENGINEERING
600 WILSHIRE BLVD. SUITE 760
LOS ANGELES, CA 90017
T: 213-627-6687
- MEP

ALFA TECH
510W 6TH STREET, SUITE #1105
LOS ANGELES, CA 90014
- LIGHTING & THEATER CONSULTANT

JOHN LEVY LIGHTING PRODUCTIONS, JLLP
350 S FIGUEROA ST. #127
LOS ANGELES, CA 90071
T: 213-629-9949
- ACOUSTICAL CONSULTANT

NICK ANTONIO ACOUSTICS
4487 COLBATH AVE. #306
SHERMAN OAKS, CA 91423
T: 310-404-1833
- SECURITY CONSULTANT

SISTEMS INTEGRATION
606 S. HILL ST., SUITE #1009
LOS ANGELES, CA 90014
T: 213-623-5584
- SIGNAGE CONSULTANT

ROBERT FITCH DESIGN
1115 S ORANGE GROVE AVE. #1
LOS ANGELES, CA 90019
T: 323-424-3146
- SPECIFICATION CONSULTANT

CG-ASSOCIATES
2626 NAPLES AVE.

VENICE, CA 90291
T: 310-578-5773
ISSUE OR REVISION NOTES:

DRAWING TITLE:

SHEET NO:

DRAWING SCALE:

SHEET SIZE:

PROJECT NO:

DATE STAMP:
24x36
2404 WILSHIRE BLVD. STE. 12D
LOS ANGELES, CA 90057
TEL: 1.213.568.3578
ARCHITECT: BRIAN WICKERSHAM
LIC: CA C-32742 / EXP: 07.31.21
AUX

ARCHITECTURE

NOT FOR CONSTRUCTION
1/8" = 1'-0"
9/22/2021 4:19:14 PM
BIM 360://Creative Community Center/JLLP_Lighting_Wende CCC_R20.rvt SL-2.23

SPECIALTY LIGHTING -
CEILING PLAN - LEVEL 3
184

CREATIVE

COMMUNITY
CENTER
1/8" = 1'-0"SL-2.23
1 SPECIALTY LIGHTING - CEILING PLAN - LEVEL 3

THESE DESIGN DRAWINGS REPRESENT VISUAL CONCEPTS AND
SUGGESTIONS ONLY. JLLP INC. IS NOT A LICENSED ENGINEER OR

ARCHITECT OR OTHERWISE QUALIFIED TO DETERMINE WHETHER THE

DESIGN MEETS APPLICABLE STRUCTURAL AND SAFETY STANDARDS OR BUILDING CODE REQUIREMENTS. ACCORDINGLY JLLP DOES NOT ASSUME

RESPONSIBILITY FOR THE STRUCTURAL INTEGRITY OF OR THE BUILDING OR

SAFETY CODE COMPLIANCE OF THE DESIGN OR FOR THE CONSTRUCTION,

RIGGING, HANDLING OR THE USE OF THE ARCHITECTURAL ELEMENTS AND EQUIPMENT DEPICTED OR REQUIRED IN CONNECTION WITH SUCH DESIGN. 1 3
SL-6.02
L1................LIGHT FIXTURE TYPE / INSTANCE QUANTITY A-1..............LIGHTING CONTROL ZONE(WHEN APPLICABLE TO A LIGHTING

CONTROL SYSTEM)
.................................BEAM ANGLES................ (4)0

LIGHT FIXTURE ANNOTATION KEY
....................LIGHT FIXTURE SYMBOL (VARIES)

SHEET GENERAL NOTES
EL100: DMX CONTROLLED, EXTERIOR RATED, RGBW COLOR CHANGING HIGH POWER LINEAR LED LIGHT FIXTURE, SURFACE MOUNT INSTALLED 4" OFF THE FACADE BAFFLE FEATURE FOR COLOR CHANGING WALL GRAZE EFFECT. CONTRACTOR TO PROVIDE LIGHTING POWER AS REQUIRED ON EXTERIOR LIGHTING SWITCH CONTROL SYSTEM AS REQUIRED. DMX CABLING IN OUTDOOR-RATED CONDUIT INSTALLED PER FIXTURE INSTALLATION MANUAL. DMX CABLE TO HOME RUN TO AVER DMX LIGHTING CONTROL SYSTEM REFER TO SL-8.01 AND AV-8.00.

EL100-JBOX: THE JUNCTION BOX CONNECTED BETWEEN THE DMX SPLITTER AND THE FIXTURES INSTALLED ADJACENT TO EL100 COLOR CHANGING FIXTURES IN AN ACCESSIBLE LOCATION THAT CONCEALED FROM PUBLIC VIEW, MAXIMUM 80'-0" ARE DAISY CHAINED IN 1 EL100-JBOX. CONTRACTOR TO DETERMINE THE BEST PRACTICE, QUANTITIES AND LOCATIONS OF JUNCTION BOX (EL100-JBOX) DUE TO THE SITE CONDITIONS.

FIXTURE LOCATIONS ARE INDICATIVE ON THIS PLAN, CANOPY AND FACADE DETAILS TO BE COORDINATED WITH ARCHITECT IN CD.

SHEET KEY NOTES
L110-T: LINEAR TRACK LIGHT SECTION SURFACE MOUNT AT THE SOFFIT CEILING, THE TRACK SYSTEM IS COMPATIBLE WITH DIMMABLE TRACK HEADS (L110-TH) AND DIMMABLE LINEAR TRACK LIGHT (L110-TL) TO PROVIDE ARCHITECTURAL SPOT LIGHTING AND GENERAL LIGHTING.
2 LIGHT FIXTURES WITH A CONTROL ZONE ARE TO BE DIMMED/CONTROLLED BY ALL NEW CRESTRON LIGHTING CONTROL SYSTEM.

ALL NEW CRESTRON CAEN-GREEN LIGHT DIMMING SYSTEM TO BE SPECIFIED AND DESIGNED INTO THE PROJECT, ABOUT ONE 5X2 CAEN MLO PANEL ALONG WITH TOUCH SCREEN LIGHTING CONTROL SYSTEM TO BE UNIFIED WITH AV USER INTERFACE AND

SIMPLE CRESTRON ROOM LIGHTING CONTROL KEY PADS ALONG WITH ANY OCC/VAC/DAYLIGHT SENSORS AS REQUIRED BY TITLE 24 STANDARDS REFER TO PE.

CONTRACTOR TO AIM, ADJUST, FOCUS, RELAMP, RELENS FIXTURES AS REQUIRED DURING LIGHTING AIMING WORK WITH LIGHTING CONSULTANT. PROVIDE ALL TOOLS, GLOVES, LADDERS, LIFTS, AS REQUIRED, COORDINATE AND SCHEDULE ALL AIMING WITH LIGHTING CONSULTANT AND ALL OTHER TRADES AND OPERATIONS SO ALL FIXTURES ARE ACCESSIBLE.

A
B
1 2
5 1
SL-4.01
(TYP.)
L117: DAMP LOCATION RATED CEILING RECESSED, COMMERCIAL GRADE 2" LED LINEAR DOWNLIGHT, FIXTURE TO BE INSTALLED UNDERNEADTH STAIRS AT SLOPED CEILING TO PROVIDE GENERAL STAIRS LIGHTING. PE TO SUPPLEMENT JLLP CRESTRON LIGHTING CONTROL SYSTEM WITH VAC/OCC/DAYLIGHT AND/OR OTHER SENSORS AS REQUIRED BY TITLE 24 AND SHOWN IN PE DRAWINGS.
5 3
(TYP.)
(TYP.)
L109: CEILING RECESSED DIMMABLE 4'x2' LED LIGHT TROFFER TO BE INSTALLED AT IT/STORAGE ROOM. PE TO SUPPLEMENT JLLP CRESTRON LIGHTING CONTROL SYSTEM WITH VAC/OCC/DAYLIGHT AND/OR OTHER SENSORS AS REQUIRED BY TITLE 24 AND SHOWN IN PE DRAWINGS.
3 L100: DIMMABLE, WALL RECESSED COVE LIGHT FIXTURE TO BE INSTALLED CONTINUOUSLY AT CORRIDOR WALL ELEVATION 24" OFF THE CEILING TO PROVIDE INDIRECT GENERAL LIGHTING. PE TO SUPPLEMENT JLLP CRESTRON LIGHTING CONTROL SYSTEM WITH VAC/OCC/DAYLIGHT AND/OR OTHER SENSORS AS REQUIRED BY TITLE 24 AND SHOWN IN PE DRAWINGS. 4 4
1 SL-6.02
(TYP.)
6 (TYP.)
1 3A
SL-6.02
1 SL-8.01
NO. DATE DESCRIPTION
06/09/21 50% CONSTRUCTION DOCUMENTS
09/24/21 75% CD (PLAN CHECK SET)
1 SL-8.01
1 1
SL-6.03
1 SL-8.01
1 1
SL-6.03
1 SL-8.01
L116: CEILING SURFACE MOUNT, COMMERCIAL GRADE 2" LED LINEAR DOWNLIGHT, FIXTURE TO BE INSTALLED UNDERNEADTH STAIRS AT THE SLOPED CEILING TO PROVIDE GENERAL STAIRS LIGHTING. PE TO SUPPLEMENT JLLP CRESTRON LIGHTING CONTROL SYSTEM WITH VAC/OCC/DAYLIGHT AND/OR OTHER SENSORS AS REQUIRED BY TITLE 24 AND SHOWN IN PE DRAWINGS. 6 L111: CEILING PENDANT HUNG LED CYLINDER FOR GENERAL LIGHTING. BOTTOM OF FIXTURE TO ALIGN WITH THE BOTTOM OF ADJACENT SUSPENDED SLATS. PE TO SUPPLEMENT JLLP CRESTRON LIGHTING CONTROL SYSTEM WITH VAC/OCC/DAYLIGHT AND/OR OTHER SENSORS AS REQUIRED BY TITLE 24 AND SHOWN IN PE DRAWINGS. 7 7
(TYP.)

PROPOSED LIGHTING

AUX ARCHITECTURE
2021.10.20
70 CULVER CITY COMPREHENSIVE PLAN

98.40 101.15
100.00

94.02 92.60

95.33 95.38 95.46

95.33 CB/TC

94.80 CB/FL

94.93 CB/FL

95.38 CB/TC 95.55

95.56 TOP "X"

95.20 BOT "X" 95.25 BOT "X"

95.70 TOP "X"

95.58 CB/TC

95.10 CB/FL

94.94 CB/FL

95.45 CB/TC95.06 TC

94.50 FL

95.48 95.74
PALM

95.80 PALM

95.08 FL

95.60 95.68

95.22 FL

95.56 95.82

95.74 95.84

96.09 PALM

96.16 PALM

96.23 PALM

95.99 95.37 FL

95.87 TC

96.13 96.43 96.51

96.60 96.36

96.30 96.19

95.60 95.75 FL

96.24 TC

96.72 97.68 TC

97.20 FL

98.27 TC 98.28 TC

97.71 FL

97.97 98.24

98.40 98.32

98.9697.73

98.51 12"ØTREE

98.52 98.27

98.7996.52

97.03 96.92

98.90 99.11

99.07 98.84
PALM

98.43 PALM98.29
PALM

97.78 PALM

98.96 PALM

99.07 98.92

98.4597.98

98.9899.19

98.99 6"ØTREE

99.08 TC

98.43 FL

98.94 98.27 FL

98.86 TOP "X"

98.31 BOT "X"

98.01 TC

99.36 TC

98.73 FL

98.94 99.54

99.30100.03
100.09

99.53 98.68

98.45 98.20

97.85 98.11
124.04
ROOF ELEV.

98.74 98.04

97.04 96.64

97.22 97.36

97.13 97.79

98.26 98.86

98.69 98.81

98.17 99.1199.00

99.16 PALM

99.33 PALM 99.57
PALM

99.47 PALM 99.48
PALM

99.71 100.23
107.65
TW

99.16 99.21 99.40 99.57

99.4099.29

99.29 99.21

99.2699.43

99.64 TW

99.44 FF 99.14

99.31 99.31

98.49 PALM

98.32 PALM

98.11 PALM

99.28 98.75

98.66 99.06
108.58
OH

99.97 99.38

99.19 99.26

98.72 97.55

99.25 100.31 99.91
100.13
107.63
TW
100.04
100.15

99.97 100.27

99.89 100.19
100.33
101.0099.91

99.52 99.81

99.11 99.26

99.72 99.42

99.6899.00

99.02 124.04
ROOF ELEV.
106.73
TW
106.69
TW

98.63 98.36

98.53 97.81

97.59 97.89

99.27 99.18

99.07 99.00

99.08 99.0398.8598.80

98.79 98.78

99.46 TW

98.78 99.02

97.8597.43

97.47 123.16
ROOF ELEV.

98.73 98.4097.61

97.09 97.47

98.21 96.88

96.94 96.79

96.9496.43

96.08 96.1295.35

95.18 95.26 95.54

97.25 100.70 101.55

97.1397.07

96.90 96.75

96.65 96.5796.15

97.21 95.77

95.80 94.64

94.12 94.38

95.49 95.54
111.60
OW
117.22
OW

94.93 95.2297.51

95.35 95.53

95.30 94.66

99.38 FF

99.41 FF

99.42 FF99.41 FF99.44 FF99.42 FF

98.80 98.27

98.09 98.41
14"ØTREE

98.63 14"ØTREE

98.37 PALM

98.38 98.29

99.3099.06

99.03 PALM

99.09 PALM

99.12 99.01

99.23 PALM

99.33 99.39

99.31 99.27

98.87 98.50

98.32 98.26

98.81 99.27

98.77 98.02

98.03 97.68

97.66 98.06

98.04 98.09

98.18 98.28

98.45 PALM

98.66 PALM

98.60 PALM

98.58 98.44

98.61 98.53

98.74 98.9598.92

98.84 98.52

99.35 FF

99.27 99.29 99.23 99.26 99.20
109.00
OH
108.96
OH 98.77

97.56 98.4697.32

97.38 PALM

97.36 PALM

97.30 97.04

97.64 PALM

97.39 PALM97.35
PALM

96.32 96.56

96.5195.0494.94

94.93 96.54 TW

95.77 96.34

96.60 8"ØTREE

97.02 8"ØTREE96.51
8"ØTREE

96.95 96.9296.84

94.79 95.21

95.6495.37

95.37 95.35
TW

95.30 TW

95.15 95.26

94.30 94.3395.27

94.04 94.04

94.14 94.42 95.14
TW

95.77 97.73

97.86 97.81 97.81

97.87 98.4697.7797.4197.2497.35

96.79 96.98 97.01

96.8996.86

98.46 TW

95.90 96.45

96.30 96.33
TW

96.07 96.67

96.67 96.71

96.91 97.27

97.19 97.15

97.40 97.61 97.72
PALM

97.67 PALM97.55
PALM

96.78 PALM

96.68 PALM

96.72 12"ØTREE

96.73 PALM

96.93 96.72

96.6396.60

96.53 96.96

97.60 97.02

97.50 96.79

96.72 97.01

97.09 96.94

96.9396.77 97.69
108.42
OH
116.32

PARAPET

94.75 94.71

95.20 95.10 95.34

95.30 95.1594.81

96.89 TW

96.88 TW

95.30 95.3294.92

94.87 96.81
TW

94.96 96.76

96.75 96.63
PALM 96.99
6"ØTREE

96.7996.06
PALM

96.37 PALM

94.8694.58

94.30 95.90
TW

94.87 96.72 96.9897.10

96.86 96.69

94.69 PALM

94.57 PALM 94.71

94.83 PALM

94.2094.20

94.6594.7294.67

94.02 93.23

93.27 PALM

93.17 PALM 93.71
PALM

92.98 92.30

92.40 92.20 93.10 93.1092.44 92.55 92.92

93.44 94.17

94.50 94.20

93.83 93.28

93.72 93.23

92.58 93.56
PALM

93.51 PALM

93.68 PALM

93.57 93.93
14"ØTREE 94.18

94.7892.9091.85
CONC. CURB
& GUTTER
CONC. CURB
& GUTTER

PARKING PARKING

A/C PAVEMENT

PARKING PARKING

PARKING
CONC. CURB
& GUTTER
CONC. CURB
& GUTTER
CONC. CURB
& GUTTER CONC. CURB
& GUTTER

PARKING

PARKING PARKING PARKING
PARKINGPARKING CONC. CURB
& GUTTER
CONC. SIDEWALK

95.58 95.71 FF

93.09 94.99

93.06 93.92

94.93 95.01

92.82 FD PK NAIL IN LIEU OF S&T PER
CEFB 2 PG 51
DIRT
DIRT
DIRT
DIRT

PARKING PARKING

A/C PAVEMENT
DIRT
DIRT
DIRT
DIRT
DIRT
DIRT
DIRT
DIRT

FD SPK ON CL IN LIEU OF
NAIL PER CEFB 2 PG. 50

FD S&T ON CL INTER
PER CEFB 2 PG 50

USED AS ASSUMED BM

FD S&W ON CL
NO REF

A/C PAVEMENT

A/C PAVEMENT

94.02 92.60
114.33 OW
115.76 OW
153.48 OW BOT
164.49 OW TOP
159.83 OW TOP
148.93 OW BOT
153.80 OW BOT
165.79 OW TOP
161.26 OW TOP
149.41 OW BOT
154.62 OW BOT
166.51 OW TOP
161.92 OW TOP
150.03 OW BOT

93.2193.1493.0292.9492.8192.7492.6592.5692.49

93.38 95.76 FF

95.78 FF 95.80 FF

95.81 FF 97.00 FF

97.02 FF

93.13 93.18

93.68 93.64

94.15 94.18

94.73 95.47

95.31 94.90

94.03 93.60

93.21 94.43
14"ØTREE
135.04 OW TOP

95.35 95.28
117.28 OW BOT115.47 OW BOT 136.81 OW TOP

CULVER BOULEVARD
ALLEY
10 0'
50' 50'
6 0'
30'
30'C/L

ELENDA ST

COOMBS AVE
6 0'
30' 30'
C/LC/L
20'10'
10'C/L
YNTHIA A . DE LEO
CYNTHIA A . DE LEON

C I V I L
No. C-31604
EXP. 12-31-2022
Cynthia A. de Leon
10/18/2021
(e.signed)
CIVIL: EXISTING SITE SURVEY, LOTS 11 - 30

AUX ARCHITECTURE
2021.10.20
71 CULVER CITY COMPREHENSIVE PLAN

CULVER BOULEVARD
ALLEY 2 0'10'
10'C/L
10 0'
50' 50'
C/L
6 0'30'
30'C/L

ELENDA STREET

FD S&W ON CL
NO REF

FD SPK ON CL IN LIEU OF
NAIL PER CEFB 2 PG. 50

FD S&T ON CL INTER
PER CEFB 2 PG 50

USED AS ASSUMED BM

FD PK NAIL IN LIEU OF S&T PER
CEFB 2 PG 51

COOMBS AVENUE
C/L

CULVER BOULEVARD
ALLEY
10 0'
50' 50'
6 0'
30'
30'C/L

ELENDA ST

COOMBS AVE
6 0'
30' 30'
C/LC/L
20'10'
10'C/L
No. C-31604
CYNTHIA A . DE LEON

C I V I L
EXP. 12-31-2022
Cynthia A. de Leon
10/18/2021
(e.signed)
CIVIL: EXISTING SITE SURVEY, LOTS 1 - 10

AUX ARCHITECTURE
2021.10.20
72 CULVER CITY COMPREHENSIVE PLAN
The grading associated with the Creative Community Center for Phase 2 – Area 2, will include a minor conventional cut and fill grading operation to create the desired pad grades and provide for proper site drainage. The grading volumes include 67 cubic yards of cut and 52 cubic yards of cut. Grading may also include removal and re-compaction of the near-surface soils to a certified fill condition pursuant to the recommendations of the Project geotechnical consultant. The six modular units will be one story and will have minimal grading with their installation.

It is anticipated that drainage improvements associated with the Project may include graded and paved swales, catch basins and pipe culverts that collect and direct drainage to suitable discharge locations.

CIVIL PHASE TWO - AREA 2: PROPOSED CIVIL

AUX ARCHITECTURE
2021.10.20
73 CULVER CITY COMPREHENSIVE PLAN

99.71 97.40
CONC. CURB
& GUTTER
CONC. CURB
& GUTTER

PARKING PARKING

A/C PAVEMENT

PARKING PARKING

PARKING
CONC. CURB
& GUTTER
CONC. CURB
& GUTTER
CONC. CURB
& GUTTER
CONC. CURB
& GUTTER
PARKING PARKING PARKING PARKINGPARKINGPARKING CONC. CURB & GUTTER
CONC. SIDEWALK
DIRT
DIRT
DIRT
DIRT

PARKING PARKING

A/C PAVEMENT
DIRT
DIRT
DIRT
DIRT
DIRT
DIRT
DIRT
DIRT

A/C PAVEMENT

A/C PAVEMENT
SHEET
SCALE:

JOB NO:

DRAWN:
lcegroupinc.com info
7952
NZ

THE WENDE MUSEUM
10808 CULVER BOULEVARD
CULVER CITY, CA 90230
DATE: 7/23/2021
1"=20'
CIVIL PHASE TWO - AREA 2: PROPOSED CIVIL

AUX ARCHITECTURE
2021.10.20
74 CULVER CITY COMPREHENSIVE PLAN
PARKINGPARKING CONC. CURB
& GUTTER
SHEET
SCALE:

JOB NO:

DRAWN:
lcegroupinc.com info
7952
NZ

THE WENDE MUSEUM
10808 CULVER BOULEVARD
CULVER CITY, CA 90230
DATE: 7/23/2021
1"=10'
CIVIL PHASE TWO - AREA 2: PROPOSED ENLARGED GRADING & DRAINAGE PLAN

AUX ARCHITECTURE
2021.10.20
75 CULVER CITY COMPREHENSIVE PLAN
SHEET
SCALE:

JOB NO:

DRAWN:
lcegroupinc.com info
7952
NZ

THE WENDE MUSEUM
10808 CULVER BOULEVARD
CULVER CITY, CA 90230
DATE: 7/23/2021

CROSS SECTIONS
1"=10"
CIVIL PHASE TWO - AREA 2: PROPOSED SECTIONS

AUX ARCHITECTURE
2021.10.20
76 CULVER CITY COMPREHENSIVE PLAN

97.40 PARKINGPARKING CONC. CURB
& GUTTER

A/C PAVEMENT
SHEET
SCALE:

JOB NO:

DRAWN:
lcegroupinc.com info
7952
NZ

THE WENDE MUSEUM
10808 CULVER BOULEVARD
CULVER CITY, CA 90230
DATE: 7/23/2021
1"=10'
CIVIL PHASE TWO - AREA 2: PROPOSED UTILITY PLAN

AUX ARCHITECTURE
2021.10.20
77 CULVER CITY COMPREHENSIVE PLAN

RECREATIONAL ACTIVITY PROGRAMMING
The Creative Community Center will operate as a multi-use space, incorporating a multi-purpose room for live performance and literary events, classrooms for dance and art instruction, a demonstration garden, skill-sharing and resource exchange areas, meeting rooms, tutorial offices, dedicated places for hands-on learning opportunities, and exhibition spaces. The Creative Community Center’s ancillary spaces and uses related to the operation of the facility, including offices, meeting rooms, and a small kitchen facility for on- site catering, will provide amenities that will elevate it to a full service recreational facility.

The Wende will operate the existing Museum and the Creative Community Center together, coordinating programming and use to ensure that the number of visitors on a daily basis at the site will remain consistent with current levels. A full-time Program Coordinator will ensure that major events never occur at the same time at the Museum and at the Creative Community Center. As the Program Coordinator will facilitate both externally with groups and individuals that want to use the Creative Community Center and the Wende Museum, the Program Coordinator will be encouraged and empowered to identify and book programing which will maximize recreational opportunities for the community. The Program Coordinator’s responsibilities will extend to the outdoor garden space connecting the existing Wende Museum and the Creative Community Center.

AUX ARCHITECTURE
2021.10.20
78 CULVER CITY COMPREHENSIVE PLAN

SAFETY & SECURITY
In In conformance with requirements listed under CCMC Section 17.250.030(C), the proposed project is designed to promote the safety and security for all visitors of the Wende Museum and Creative Community Center, including open space patrons, and adjacent housing units. The Wende Museum (Phase 1). the Creative Community Center (Phase 2), and the Community Garden and Affordable Housing (Phase 3) will provide synchronized maintenance and operations to ensure continuity of such measures described below. • Security Devices: An expanded surveillance and security system for the Wende Museum and the Creative Community Center shall be established to provide coverage at entrances and exits. Devices shall consist of video surveillance cameras, access control with burglar alarm devices, motion sensors and other intrusion detection devices.
• Landscape Design: Phases 1, 2 and 3 shall be surrounded by an extended fence originating from the Wende Museum. Fencing will also be provided in between Phases 2 and 3. In addition, perimeter vegetation of predominantly low height shall be provided, which will allow patrons to have visibility of their surroundings between the interior and exterior of the Project Site, while also creating a protective barrier.
• Lighting: The Creative Community Center shall include lighting which illuminates entrance and exits, walkways and open spaces. Similarly, walkways, entrances, exits and open space in Phase 3 shall be provided with high quality lighting also serving security purposes. In accordance with the CCMC, lighting levels shall be shielded to ensure there is no light trespass upon the neighbors while maintaining safe illuminated walkways, alleys, and also to deter vandalism. • Graffiti and Vandalism-Control Measures: Phases 2 and 3 shall include the following preventive measures for exterior walls and openings.

1. Barriers: A visible and continuous barrier consisting of landscape and fencing will prevent and/or discourage unauthorized persons from easily accessing the Wende Museum and the Creative Community Center.

2. Surface protection: Glazing and glazing exterior doors with locking mechanism will be fully tempered glass. Also, protective coatings will be introduced to prevent the materials used for tagging from bonding to the building’s surface.

AUX ARCHITECTURE
2021.10.20
79 CULVER CITY COMPREHENSIVE PLAN

MOBILITY & TRANSPORTATION DEMAND MANAGEMENT
The Project incorporates a total of approximately 4,185 square feet of public and private outdoor open spaces, landscaping, patios, and amenity spaces. Connectivity among the local communities is greatly enhanced by the Project. The publicly accessible open space area, and the Creative Community Center in the Project expand the range of community space available to the neighboring residents and others.

Compliance with regulatory requirements and site design elements that will enhance the use of walking, biking, and public transit as alternatives to the automobile is built into the proposed design for the Project. The Project incorporates site design elements with multiple mobility features, including short- and long-term bicycle parking, a designated drop-off area for ride share, and the maintenance and enhancement of pedestrian access to the existing public transit options adjacent to the Project Site. The Project will make subsidies for public transit available to employees and residents.

The following measures shall be incorporated into the TDM Program:
• Bicycle Parking: The Project shall provide eight short-term and four long-term bicycle parking spaces at the Project Site. Bicycle racks for visitors will be available in front of Creative Community Center, at the existing walkway adjacent to the parking lot, within fifty feet of the main pedestrian entry to the Creative Community Center. Long term, indoor bicycle parking, featuring wall-mounted racks within an enclosure that has a locking mechanism will be provided in the Creative Community Center for Project employees. Bicycle parking will also be made available to Phase 3 residents. Phase 3 shall provide four short-term and six long-term bicycle parking spaces. Though the initial Comprehensive Plan did not require a specific number of bicycle parking spaces for Phase 1, the museum included 6 parking spaces.

• Access to Public Transportation: Culver City Bus operates service along Culver Boulevard, with lines 7 and 437A stopping at Culver Boulevard and Elanda Street, right next to the Project Site. Culver City Bus line 3 stops at Culver Boulevard and Overland Boulevard, which is less than a quarter mile from the Project Site. Landscaping and architectural improvements, including the reconfiguration of the Community Garden as a part of Phase 3, will improve the pedestrian experience for those accessing the Project Site via bus. • Transit Subsidies: Upon request from an employee or resident, the Project will make transit subsidies available to encourage further bus and metro ridership. Culver City Bus lines 3, 7, and 437A, identified above as accessible to the Project Site, provide extensive connections to Metro, Culver City Bus, and Santa Monica Big Blue Bus lines along Jefferson Boulevard, Washington Boulevard, Venice Boulevard, and Pico Boulevard, as well as the Metro E Line (Expo) Culver City station, approximately a mile and a half from the Project Site. • Rideshare Drop-Off Location: The Project will include a rideshare drop-off location, at a designated curb near Phases 2 and 3. This designated rideshare location will both encourage rideshare usage and help ensure that multi-modal options for accessing the Project Site operate safely and harmoniously. • Commute Marketing Program: Marketing materials promoting Project exhibits, features, and events will highlight the Project Site’s accessibility to public transit, to educate and inform visitors about site-specific transportation options and the effects of their travel choices. A bulletin board, display case, or kiosk displaying transportation information will be maintained in a prominent area accessible to employees at either the Museum or Creative Community Center. Available information will include 1) current maps, routes and schedules for public transit routes serving the site; 2) telephone numbers for referrals on transportation information including numbers for the regional ridesharing agency, transportation management associations, and local transit operators; 3) ridesharing promotional material supplied by commuter-oriented organizations; 4) bicycle route and facility information, including regional/local bicycle maps and bicycle safety information; and 5) a listing of any other facilities and resources that may be available for carpoolers, vanpoolers, bicyclists, transit riders and pedestrians at the site.

AUX ARCHITECTURE
2021.10.20
80 CULVER CITY COMPREHENSIVE PLAN

SUSTAINABILITY
The Project provides the following sustainability features and technologies and incorporates design and operational strategies that respond to key objectives for the site. • Promote the use of bus, bicycle, rideshare, and other public transportation options by incorporating extensive walkways and open space, ride share loading and drop-off, and bicycle amenities into the Project. The Project being sited at an infill location, in close proximity to transit options, as well as its inclusion of bicycle friendly amenities, will encourage alternative forms of transportation rather than vehicle trips and single occupancy vehicle trips.
• Phase 2 will utilize nearly 2,000 square feet of an existing building which will reduce the carbon footprint by approximately 50 metric tons of embodied CO2 (Per Construction Carbon Calculator), saving material and diverting waste from landfills.
• Phases 2 and 3 will use concrete, which is a long life-cycle material, as the primary building structural system (floors, roof and walls). In addition to lifespan, the concrete also has a high thermal mass and will absorb the sun’s energy during the day and then radiate that energy during the cooler hours of the evening; reducing temperature fluctuations and improving building comfort which reduces the use of mechanical systems and associated emission of greenhouse gases. The thermal mass of the Creative Community Center is coupled with a passive solar system; overhangs and fixed screens shade the building’s windows from heat gain in summer months.
• Create a sustainable project measured with the following sustainable features:
• Storm water collection and discharge in compliance with the City’s storm water ordinance and low-impact development standards;
• Drought tolerant and water efficient landscaping;
• Low-VOC content materials, paints, and coatings;
• On-site recycling collection facilities;
• Energy Star rated appliances;
• Culver City Green Building Program’s Design;
• California Green Building Code’s mandatory requirements.

AUX ARCHITECTURE
2021.10.20
81 CULVER CITY COMPREHENSIVE PLAN

FOOTNOTES

i The Creative Economy of Culver City, The Center of Art Culture Music Technology Architecture Fashion Design Entertainment. ii The Wende Museum has developed strategic partnerships with regional, federal, global organizations and universities from London, Berlin, Leipzig, and Los Angeles, including the University of Southern California, University of California Los Angeles, Loyola Marymount University, and community colleges. The Museum internship program combines academic research and applied skills, to train a new generation of museum professionals. Monthly open house events for neighbors and the larger Culver City population, engage the community in diverse topics.
iii The Museum has enlarged and diversified the Wende’s audience, providing more effective access for scholars, artists, students, journalists, artists, authors, filmmakers, the general public and partner organizations. The Wende serves thousands of residents every year and engages with communities inside and outside of Culver City; the Creative Community Center will prompt learning opportunities for new and existing audiences, extending educational and cultural programming, and partnering with community organizations. iv The new Creative Community Center will enlarge and diversify the Wende’s audience, leveraging progress and attracting new funding.

The Wende will be able to serve its audiences better by providing more effective access for scholars, artists, students, journalists, artists, authors, filmmakers, the general public and partner organizations.

AUX ARCHITECTURE
2021.10.20
82 CULVER CITY COMPREHENSIVE PLAN

← All documents from this meeting