Quantity unit unit price cost
1 Clear and Grubbing 252691 SF $1 $252,691
2 Remove Dirt (10") & compact
subgrade
7799 CY $180 $1,403,839
3 Furnish and install 6” Base 9476 Ton $100 $947,591
4 Drainage improvements 1 LS $200,000 $200,000
5 Const. 2’ concrete V-Gutter 25844 SF $50 $1,292,200
6 Redwood headers 12,922 LF $50 $646,100
7 Const. 4” of Asphalt 6,317 Ton $150 $947,591
8 Adjust MH to grade 70 EA $1,500 $105,000
9 PCC alley approach !""## $% &'# $864,000
10 Alley ADA curb ramps (# )* &"+### $280,000
11 Construction Survey ! ,$ &-##+### $200,000
12 Traffic Control ! ,$ &-.#+### $250,000
13 Mobilization ! ,$ &-.#+### $250,000
/0/12 $7,386,321
304/54674389:!.;< $1,107,948
!"!#$%&"'(!)*&!+"', $8,494,270
1 Design Survey
2 Plans and Specifications Design
3 Construction Management
4 Construction Inspection
5 Materials Testing
=0/129)465477>5469:?.;90@9304A/>B3/504930A/< &-+C(-+CC"D?' !"!#$%&"'!( )**+,-.+/-012-
),3104
Paving dirt alleys and PCI less than 10
4 inches asphalt concrete on 6 inches aggregate base