BRADDOCK DR.AREAS OFWORK
DUQUESNE AVE.
4040 Duquesne Ave.Culver City, CA 9023223.03
ISSUED FOR:
Culver City Police DepartmentWindow Replacements
Not Published, all rights reserved.The above drawings andspecifications and ideas, designs andarrangements represented therebyare and shall remain the property ofthe Architect. No part thereof shallbe reproduced, copied, adapted,disclosed, or distributed to others,sold, published, or otherwise usedwithout the prior written consent ofand appropriate compensation to theArchitect. Visual contact with theabove drawings or specification shallconstitute conclusive evidence ofacceptance of these restrictions. 1644 TALMADGE ST. LOS ANGELES, CA 90027T: 213-935-0665
WINDOW REPLACEMENTSCULVER CITY POLICE DEPARTMENT
CLIENT/OWNER
PROJECT PARTICIPANTS-
1.In no case shall work be scaled from plans or details. Refer to dimensions shown on drawings only. If a dimension is missing, notify the Architect for verificationof correct information prior to installing work. Larger scale drawings shall take precedence over smaller scale drawings. Dimension lines are to face of concreteor face of stud, unless noted otherwise. At existing conditions, dimensions are to face of existing wall (F.O.W), whether it be concrete or gypsum construction.2.Contractor and Subcontractors shall be responsible for construction, workmanship and materials conforming to all applicable local, city, state and federalregulations, ordinances and codes, latest edition. Code requirements take precedence over the drawings.3.All work shall be in full accordance with the 2022 Edition of the California Building Code, 2022 California Plumbing Code, 2022 California Mechanical Code, 2022California Electrical Code, 2022 California Energy Code, and all local codes and ordinances adopted with the latest rules of NFPA and OSHA. Particular attentionshall be paid to the State of California Handicapped Access Regulations (Title 24) & A.D.A. Nothing in these plans or specifications shall be construed to permitwork not according to Code.4.EXAMINATION OF THE SITE - Before submitting his/her bid, the Contractor shall examine the site and compare it with the plans and notes and to satisfyher/himself as to the conditions under which this work will be performed. The Contractor shall at that time ascertain the condition of the existing structures andequipment that may affect this work. S/he shall likewise determine with the Owner under what Security conditions, or special hours of operation limitations, thework shall be performed. No allowance shall subsequently be made for the Contractor's failure or neglect to make such examinations or determinations. TheContractor shall verify all quantities before submitting his/her bid.5.All work shall be performed in accordance with the property Building Standards and Procedures such as (but not limited to) equipment, system and materialstandards, work schedule, delivery times and locations, debris disposal, cleaning, etc. The contractor is responsible for contacting the building personnel to verifyall Building Standards and Procedures prior to any construction.6.The Contractor shall report to RTI CONSULTING any error or omission discovered in the drawings or any inconsistencies between the drawings and fieldconditions, prior to commencing work. It shall be the responsibility of the Contractor to verify and account for existing conditions and dimensions prior to startingwork, including utilities (H.V.A.C., electrical conduit, and plumbing, telephone, etc.) and all other works and facilities that affect this project. After the start ofconstruction, the Contractor shall be responsible for any time delays and corrective measures which arise from errors, omissions and inconsistencies which havenot been brought to the attention of the Architect. Corrective measures shall be implemented without cost to the Architect or Owner.7.The Contractor shall pay all fees, miscellaneous costs, and obtain and pay for all permits necessary to complete all work, unless stated otherwise in the projectSpecifications. Before final acceptance of any part of the work the Contractor shall furnish the Project Manager with appropriate "Certificates of Inspection" statingthat work has been inspected and approved by the Building Department.8.The Contractor shall insure that all work drawn, specified or essential for the completion of the same is accounted for in the contracts of his sub-contractors (whenappropriate) and is accounted for and reflected in the base bid.9.The Contractor agrees to furnish and transport all necessary labor, materials, tools, and implement required to perform and completely finish in a workmanlikemanner to the satisfaction and approval of Owner, with all applicable building codes and zoning regulations applicable to the subject premises.10.The Contractor and Subcontractors shall maintain liability and worker's compensation insurance to protect themselves and their workers and shall hold the Ownerand the Architect harmless from any and all claims for damages for personal or bodily injury or death or property damage during the course of construction.Contractors and subcontractors performing work on or related to these plans shall conduct their operations so that all employees are provided a safe place towork and the public is protected. All contractors and subcontractors shall comply with the "Occupational Safety and Health Regulations" of the U.S. Dept. ofLabor and with the State of California Dept. of Industrial Relations, "Construction Safety Orders."11a.During the life of the Contract the Contractor shall provide and pay for all temporary sanitary facilities and all temporary power, water, heat, fences, lighting,barricades, protection, scaffolding, shoring, stairs, etc., as required for the timely completion of the work, unless otherwise stated in Item 11b, or agreed to inwriting. All above provisions shall be in compliance with all applicable codes and ordinances.11b.All power for welding must be provided by the contractor or sub-contractor.12.The Contractor will be fully responsible for supervision of all work done by any of his subcontractors. The Contractor's responsibility for such supervision shallinclude all aspects of such work, including without limitation the speed, quality and safety thereof. All subcontractors employed by the Contractor shall be dulylicensed, unless otherwise approved by Owner, in writing.13.The Contractor guarantees that the work performed will be free from faulty materials and workmanship. On receiving notification from the Owner, the Contractoragrees to remedy, repair or replace immediately, without cost to the owner and to the owner's satisfaction, all defects and imperfections. It shall be understood,unless otherwise noted, that all materials and workmanship shall be guaranteed for a period of one year by the Contractor from the acceptance of the project bythe Owner.14.The Contractor shall notify the Owner of any extra costs arising from the execution of his Contract or his subcontracts and shall receive written Owner's approvalof extra costs prior to the work involved.15.All construction documents are complementary. What is specified by any construction document will be binding as if specified by all construction documents. Anywork shown or referred to on any construction document shall be provided as though shown on all related documents.
16.The construction documents are provided to illustrate the design and general type of construction desired, and imply the finest quality of construction, material andworkmanship. The Contractor, in assuming responsibility for the work indicated, shall comply with the spirit as well as the letter in which they were drawn.17.Incidental items not indicated on the drawings or mentioned in the specifications that can be legitimately and reasonably inferred to belong to the work describedor be necessary in good practice to provide a complete installation or system shall be provided and be installed as though called out herein in every detail.18.Work done without lines or grades being given or shown on the plans, work done in the absence or without the consent of the Structural engineer and/or Owner, or any work done without written authority, will be considered as unauthorized an at the expense of the contractor.19.The location of the utilities, if indicated, on the plans is not guaranteed to be accurate or complete, but is plotted for the general information of the Contractor. Itshall be the responsibility of the Contractor to determine the exact location of all utilities and their service connections. The Contractor shall make necessarymeasures for protecting and supporting any utilities that occur in the limits of the work.20.The Contractor shall lay out the work and establish all points, grades, and levels which are shown on the drawings. If they do not conform with the physicalconditions of the proposed work, immediately notify the Architect who will make the necessary revisions or corrections. Set all grade stakes and protect them inplace as long as may be required by all trades and crafts.21.The Contractor shall protect areas from damage which may occur during construction. Any damage to new and existing construction, structure or equipment shallbe the Contractors responsibility and shall be immediately repaired or replaced to the satisfaction of the owner at the expense of the general contractor.22.TEMPORARY BRACING - It shall be the responsibility of the Contractor to install all temporary bracing and shoring to insure the safety of the work until it is in itscompleted form.23.REPAIR - The Contractor shall repair and or repaint any damage to existing structures or surfaces caused by demolition or construction in the course ofperforming this work and shall finish to match adjoining surfaces.24.All dust and noise created by the work shall be kept to a minimum.25.The Contractor shall provide sufficient means for protecting existing exposed interior finishes, and new construction and materials, from damage by weather orvandals for the course of the project.26.The Contractor shall follow general construction industry standards and manufacturer's instructions for all products.27a.SHOP DRAWINGS - Shop drawings, catalogue cuts, data sheets, and samples shall be provided as required in the Specifications and on structural, mechanical,electrical, plumbing, fire protection and landscape drawings and notes.27b.SUBMITTALS for this work shall include Mill Certifications for Structural Steel, Rods, Angles, Channels and Reinforcing Bars. Concrete and Grout Submittalsshall include mix designs to be approved by the Structural Engineer.27.The Contractor shall submit to the owner a detailed construction schedule indicating phasing of work from start to completion.28.All work listed, shown, or implied on any construction document shall be supplied and installed by the general contractor, unless otherwise noted. The Contractorshall closely coordinate his work with that of sub-contractors or vendors to assure that all schedules are met and all work is done in conformance to manufacturersrequirements.29.The Contractor shall provide the minimum insurance as required by the Client.30.The Contractor shall maintain a current and complete set of construction documents on the job site during all phases of construction for use of all trades and shallprovide all sub-contractors with current construction documents as required.31.RECORD DRAWINGS - The Contractor shall request a complete set of prints which shall be maintained in good order at the site. All differences between thelocations or arrangements indicated on these drawings and those of the actual installation shall be recorded in red pencil on the set. At the end of the project andprior to final payment, the Contractor shall sign and date each "as built" drawing as being a correct and accurate representation of the work, and shall submit thecomplete package to the Owner.33.The Contractor shall remove all rubbish and waste materials on a regular basis, of all sub-contractors and trades. He shall observe, follow and implement all therequirements of NPDES and Stormwater Pollution Prevention Program. He shall exercise strict control over job cleaning throughout construction including finalclean up upon completion of work.34.No substitution shall be made for any material, article, method or process herein specified or shown on the drawings unless approved by the architect or engineer.35. CONSTRUCTION OBSERVATION - The Engineers shall have access to the work at all times for the purpose of observing construction.
NSCALE:SITE PLAN1"= 30'-0"1
ARCHITECTURALT0.0COVER SHEET, SITE PLAN, PROJECT DATA & NOTESA0.8SCHEDULESA2.1FIRST FLOOR PLANSA2.2SECOND FLOOR PLANA4.0DETAILSA5.0WINDOW MFR CUT SHEETS
SHEET INDEX
T0.0
COVER SHEET,PROJECT DATA,SITE PLAN & NOTESCITY REVIEW
CONSULTANT
PROJECT DATADescription of WorkReplacement of the existing single glazed windows with new dualglazed insulated windows in the existing openings.2022 CBC, CMC, CEC, CPCBuilding Codes:Fire Codes:2022 California Fire Code & Title 19 of CCRV-NBuilding Construction Type:YESSmoke Detectors:B-2 (Existing, No Change)Occupancy Group:No. of Stories:2 (Existing, No Change)Bldg. Height39'-6" (Existing, No Change)YESFire Sprinklers:
Project AreaN/A (Window Replacements only)Deferred Submittals:none
ARCHITECT
SymbolDES1A1B1C1D1E
WINDOW SCHEDULE
Head Height
WidthHeight
FrameMaterialInterior TrimMaterialExterior TrimMaterialTrim FinishFixedOOOperationGlazingTypeTemperedU-Value(Max.)SHGC(Max.)Remarks- 2A2B2C2D2E2F2G2H2J2K2L2M2N
4'-0"7'-0"7'-0"ALMTLMTLn/a Low-ENO
Head Detail-Sill Detail-
---
---
WINDOW SPECIFICATION1.NEW WINDOWS TO BE BY __________ (OR EQUAL),SERIES: _______________, COLOR: _____________.GENERAL NOTES1:HINGING OR OPERATION AS VIEWED FROM THE OUTSIDE.2:FOLLOW MANUFACTURERS INSTRUCTIONS.3:VERIFY ALL WINDOW OPENING SIZES PRIOR TO ORDERING OR COMMENCING ANY WORK,CHECK FOR ANY CONFLICTS AND ALERT ARCHITECT OF ANY FINDINGS.3:1:VERIFY WITH OWNER THE WINDOW OPERATION (DIRECTION OF SWINGS, SLIDINGPANES, ETC) PRIOR TO ORDERING4:ALL WINDOW HEADERS SHALL BE AT 7'-0" AFF UNLESS NOTED OTHERWISE OR IF REQUIREDAT A SPECIFIC HEIGHT BY WINDOW MFR.5:PROVIDE FLASHING AROUND OPENINGS PER INDUSTRY STANDARDS AND DETAILS IN THISSET OF DRAWINGS.6:ALL FENESTRATIONS ON WINDOWS AND DOORS SHALL HAVE U-FACTORS AND SOLAR HEATGAIN COEFFICIENT (SHGC) VALUES IN ACCORDANCE WITH T-24 ENERGY CALCULATIONS.ALL FENESTRATIONS MUST HAVE TEMPORARY AND PERMANENT LABELS.7:GLAZING: DUAL GLAZED UNIT, TEMPERED, CLEAR, U.N.O. PROVIDE TEMPERED GLASS 'BUG'ON ALL WINDOWS REQUIRED TO HAVE TEMPERED GLAZING.8:GLAZED OPENINGS WITHIN 40" OF THE DOOR LOCK WHEN THE DOOR IS IN THE CLOSEDPOSITION SHALL BE FULLY TEMPERED GLASS OR APPROVED BURGLARY-RESISTANTMATERIAL, OR SHALL BE PROTECTED BY METAL BARS, SCREENS OR GRILLS HAVING AMAXIMUM OPENING OF 2". THE PROVISIONS OF THIS SECTION SHALL NOT APPLY TO VIEWPORTS OR WINDOWS WHICH DO NOT EXCEED 2" IN THEIR GREATEST DIMENSIONS. (6713)9:OTHER OPENABLE WINDOWS SHALL BE PROVIDED WITH SUBSTANTIAL LOCKING DEVICES.IN B, F, M AND S OCCUPANCIES, SUCH DEVICES SHALL BE GLIDE BARS, BOLTS,CROSS-BARS AND / OR PADLOCKS WITH MINIMUM 9/32" HARDENED STEEL SHACKLES ANDBOLTED, HARDENED STEEL HASPS. (6715.2)10:SLIDING WINDOWS SHALL BE PROVIDED WITH A DEVICE IN THE UPPER CHANNEL OF THEMOVING PANEL TO PROHIBIT RAISING AND REMOVING OF THE MOVING PANEL IN THECLOSED OR PARTIALLY OPEN POSITION. (6715.1)11:SLIDING WINDOWS SHALL BE EQUIPPED WITH LOCKING DEVICES AND SHALL BE SOCONSTRUCTED AND INSTALLED THAT THEY REMAIN INTACT AND ENGAGED WHENSUBJECTED TO THE TESTS SPECIFIED IN SECTION 6717.2.
WINDOW NOTES
CODES
0.300.23
2P -2Q2R
4'-0"7'-0"7'-0"ALMTLMTLn/a Low-ENO- - 0.300.23
4'-0"7'-0"7'-0"ALMTLMTLn/a Low-ENO- - 0.300.234'-0"7'-0"7'-0"ALMTLMTLn/a Low-ENO- - 0.300.234'-0"7'-0"7'-0"ALMTLMTLn/a Low-ENO- - 0.300.234'-0"7'-0"7'-0"ALMTLMTLn/a Low-ENO- - 0.300.234'-0"7'-0"7'-0"ALMTLMTLn/a Low-ENO- - 0.300.234'-0"7'-0"7'-0"ALMTLMTLn/a Low-ENO- - 0.300.234'-0"7'-0"7'-0"ALMTLMTLn/a Low-ENO- - 0.300.234'-0"7'-0"7'-0"ALMTLMTLn/a Low-ENO- - 0.300.234'-0"7'-0"7'-0"ALMTLMTLn/a Low-ENO- - 0.300.234'-0"7'-0"7'-0"ALMTLMTLn/a Low-ENO- - 0.300.23 2S3'-11"7'-4"7'-0"ALMTLMTLn/a Low-ENO- - 0.300.233'-11"7'-4"7'-0"ALMTLMTLn/a Low-ENO- - 0.300.233'-11"7'-4"7'-0"ALMTLMTLn/a Low-ENO- - 0.300.23---
WINDOW TYPE ELEVATIONS
MULLED VERTICAL(PART #WWS-01) -TYP.
ARCADIA T-200 SERIES WINDOW
SlidingXOSlidingOOX
A Operation:FConfigurationSlBC
1F1G
Configuration
SlidingXOSlidingXO
FixedOOFixedO
FixedOOFixedOOFixedOOFixedOOFixedOOFixedOOFixedOOFixedOOFixedOOFixedOOFixedOOFixedOOFixedOOFixedOOFixedOOFixedOOFixedOO 4'-0"4-0"7'-0"ALMTLMTLn/a Low-ENO- - 0.300.234'-0"4'-0"7'-0"ALMTLMTLn/a Low-ENO- - 0.300.23-Armory-4'-0"6'-0"7'-0"ALMTLMTLn/a Low-ENO- - 0.300.233'-0"4'-0"7'-0"ALMTLMTLn/a3'-4"6'-0"7'-0"ALMTLMTLn/a Auxilary BldgAuxilary BldgLow-ENO- - 0.300.23Low-ENO- - 0.300.23 Window SeriesBBBACBBBBBBBBBBBBBBBBBBB
T-500T-500T-500T-500
T-200STCT-200STCT-200STC
T-200STCT-200STCT-200STCT-200STCT-200STCT-200STCT-200STCT-200STCT-200STCT-200STCT-200STCT-200STCT-200STCT-200STCT-200STCT-200STCT-200STC 4'-0"7'-0"7'-0"ALMTLMTLn/a Low-ENO- - 0.300.234'-0"7'-0"7'-0"ALMTLMTLn/a Low-ENO- - 0.300.234'-0"7'-0"7'-0"ALMTLMTLn/a Low-ENO- - 0.300.234'-0"7'-0"7'-0"ALMTLMTLn/a Low-ENO- - 0.300.23 ARCADIA T-500 SERIES WINDOW
4040 Duquesne Ave.Culver City, CA 9023223.03
ISSUED FOR:
Culver City Police DepartmentWindow Replacements
Not Published, all rights reserved.The above drawings andspecifications and ideas, designs andarrangements represented therebyare and shall remain the property ofthe Architect. No part thereof shallbe reproduced, copied, adapted,disclosed, or distributed to others,sold, published, or otherwise usedwithout the prior written consent ofand appropriate compensation to theArchitect. Visual contact with theabove drawings or specification shallconstitute conclusive evidence ofacceptance of these restrictions. 1644 TALMADGE ST. LOS ANGELES, CA 90027T: 213-935-0665
A0.8
WINDOW SCHEDULE &NOTES
1F 1G
1A1B
1C1D1E
4040 Duquesne Ave.Culver City, CA 9023223.03
ISSUED FOR:
Culver City Police DepartmentWindow Replacements
Not Published, all rights reserved.The above drawings andspecifications and ideas, designs andarrangements represented therebyare and shall remain the property ofthe Architect. No part thereof shallbe reproduced, copied, adapted,disclosed, or distributed to others,sold, published, or otherwise usedwithout the prior written consent ofand appropriate compensation to theArchitect. Visual contact with theabove drawings or specification shallconstitute conclusive evidence ofacceptance of these restrictions. 1644 TALMADGE ST. LOS ANGELES, CA 90027T: 213-935-0665
A2.1
FIRST FLOOR PLANS
NSCALE:1ST FLOOR PLAN1/8" = 1' - 0"1
2C2D2A2B 2E2F2G2H2J2K2L2M2N2P
2Q2R2S
4040 Duquesne Ave.Culver City, CA 9023223.03
ISSUED FOR:
Culver City Police DepartmentWindow Replacements
Not Published, all rights reserved.The above drawings andspecifications and ideas, designs andarrangements represented therebyare and shall remain the property ofthe Architect. No part thereof shallbe reproduced, copied, adapted,disclosed, or distributed to others,sold, published, or otherwise usedwithout the prior written consent ofand appropriate compensation to theArchitect. Visual contact with theabove drawings or specification shallconstitute conclusive evidence ofacceptance of these restrictions. 1644 TALMADGE ST. LOS ANGELES, CA 90027T: 213-935-0665
A2.2
SECOND FLOOR PLAN
NSCALE:2ND FLOOR PLAN (PARTIAL)1/8" = 1' - 0"1
4040 Duquesne Ave.Culver City, CA 9023223.03
ISSUED FOR:
Culver City Police DepartmentWindow Replacements
Not Published, all rights reserved.The above drawings andspecifications and ideas, designs andarrangements represented therebyare and shall remain the property ofthe Architect. No part thereof shallbe reproduced, copied, adapted,disclosed, or distributed to others,sold, published, or otherwise usedwithout the prior written consent ofand appropriate compensation to theArchitect. Visual contact with theabove drawings or specification shallconstitute conclusive evidence ofacceptance of these restrictions. 1644 TALMADGE ST. LOS ANGELES, CA 90027T: 213-935-0665
A5.0SCALE:FIXED WINDOW MFR. CUT SHEETS (T-200 SERIES)N/A1
FIXED WINDOW DETAILCUT SHEETS
SCALE:MULLED VERTICAL STRENGTHENER FOR T-200 SERIESN/A2 SCALE:SLIDING WINDOW MFR. CUT SHEETS (T-500 SERIES)N/A3