projects at 5757 Uplander Way and 5730 Uplander Way were NOT included.
These 2 proposed projects, if built, will result in an additional 1396 units in close proximity to the 5700 Hannum Avenue development.
3. Message to City Council: Did you read the EIRs that you are asking us the public to comment? Do you know the change that you are deciding to impose in an entire neighborhood? The minimum that the city council can do is to provide a full well done EIR including all the concerns brought up by the residents. Item 1 above is extremely important to the community. A change of 1 or 2 degrees inside our units in the hot summer without AC, can become lethal for the most vulnerable population. Here is a portion of the EIR, please at least read this part:
"Significant and unavoidable impact: A significant and unavoidable impact is a substantial adverse effect on the environment that cannot be avoided or mitigated to a less than significant level. A project with significant and unavoidable impacts could still proceed, but the City would be required to prepare a statement of overriding considerations, pursuant to CEQA Guidelines Section 15093, explaining what factors the City considered in approving the project notwithstanding the potential for significant environmental impacts. “ City Council, if your intention is to override our CEQA guidelines (protection that is in place for the public), you must understand and demand all the consequences you are going to impose in Fox Hills.
4. From the EIR "the regional climate within the Air Basin is considered semi-arid and is characterized by warm summers, mild winters, infrequent seasonal rainfall, moderate daytime onshore breezes, and moderate humidity.”….. We can tell you, we live here, we have great air flow. The construction being higher and a massive structures west and south west of us means less air flow. From EIR "The combination of stagnant wind conditions and low inversions produces the greatest pollutant concentrations. “ This is one more reason to study the air flow (ocean breeze) affect. It can cause of air pollutants not moving away from the neighborhood. Remember, we need the ocean breeze that comes from the west to cool us down and move the air pollutants. We have the 405 and major boulevards and high traffic street all around us. This neighborhood is ok now because we have a well balanced nature help but your construction can upset the balance we have now.
5. We ask for Alternative 1 or Alternative 3 (Reduced project alternative)
6. Lower height for every building. Do not exceed existing building height.
Yumi Mandt-Rauch
Fox Hills Resident
Letter IND 7C
From: Eurana High <[email protected]>
Sent: Monday, May 20, 2024 3:37 PM
To: Culver City Advance Planning Division <[email protected]> Subject: Fox Hills
Dear City council and city staff,
For City Council and city staff:
Currently, not every resident in Fox Hills gets notice of the projects that affect us. This due to the 500 ft rule for notice. Depending on the location, NONE of the residents get notice about the projects. The only way people get to know is thru the advocacy groups that work for the neighborhood. Cemeteries, offices, park, are receiving notices and the residents are NOT. The spirit of the law is not met with 500 ft. We must have at least 2000 ft to make sure everyone affected by the change is notified. Also the notice’s is given for transparency. If the developer is asking for an exemption or exception of a law that protects the public, that should be in the notice. Not the law number, but in words that a common person can understand.
The city must protect the residents and always have the residents BEST interest first!
This is a response to the 5700 Hannum EIR. Here are our concerns:
1. Fox Hills current buildings are older and have no capability of adding AC systems.
The current cooling system for Fox Hills relies on natural ocean breeze. The most eco-friendly way to cool a unit. All the new development is west or south west of existing buildings and it has a potential of blocking or diverting our current ocean breeze. This could translate to several degrees of increase of heat for the current residents. Related to this issue is the excess height of the new development which will cause further blocking or diversion. Fox Hills asks to add to the EIR study the ocean breeze effect based on the all projects that are happening in Fox Hills. I do not see 5757 Uplander in your study as part of the other projects. There is another one that was not in your list. We need to know what happens to our ocean breeze, i.e. our cooling if you’re building blocks or divert our air flow. The city of Culver City MUST do this study for the Fox Hills residents since the city is changing the density so excessively here. This is the minimum the city can do for the current residents.
2. The EIR shows “Unavoidable Significant Impact”. Question: Why this study did not include the other projects in Fox Hills? One of them is 1106 units (577 Uplander) alone. If not, the city of Culver City MUST do a new study w/ all the current projects.
Not partial list. HOW DO WE KNOW OF THIS INCOMPLETE REPORT ANALYSIS?: Of the 12 related projects listed in the report link below on Page 82/Table 3.1, (See page 81 that states EIR requirement), the proposed projects at 5757 Uplander Way and 5730 Uplander Way were NOT included. These 2 proposed projects, if built, will result in
an additional 1396 units in close proximity to the 5700 Hannum Avenue development.
3. Message to City Council: Did you read the EIRs that you are asking us the public to comment? Do you know the change that you are deciding to impose in an entire neighborhood? The minimum that the city council can do is to provide a full well done EIR including all the concerns brought up by the residents. Item 1 above is extremely important to the community. A change of 1 or 2 degrees inside our units in the hot summer without AC, can become lethal for the most vulnerable population. Here is a portion of the EIR, please at least read this part: "Significant and unavoidable impact: A significant and unavoidable impact is a substantial adverse effect on the environment that cannot be avoided or mitigated to a less than significant level. A project with significant and unavoidable impacts could still proceed, but the City would be required to prepare a statement of overriding considerations, pursuant to CEQA Guidelines Section 15093, explaining what factors the City considered in approving the project notwithstanding the potential for significant environmental impacts. “ City Council, if your intention is to override our CEQA guidelines (protection that is in place for the public), you must understand and demand all the consequences you are going to impose in Fox Hills.
4. From the EIR "the regional climate within the Air Basin is considered semi-arid and is characterized by warm summers, mild winters, infrequent seasonal rainfall, moderate daytime onshore breezes, and moderate humidity.”….. We can tell you, we live here, we have great air flow. The construction being higher and a massive structures west and south west of us means less air flow. From EIR "The combination of stagnant wind conditions and low inversions produces the greatest pollutant concentrations. “ This is one more reason to study the air flow (ocean breeze) affect. It can cause of air pollutants not moving away from the neighborhood. Remember, we need the ocean breeze that comes from the west to cool us down and move the air pollutants. We have the 405 and major boulevards and high traffic street all around us. This neighborhood is ok now because we have a well balanced nature help but your construction can upset the balance we have now.
5. We ask for Alternative 1 or Alternative 3 (Reduced project alternative)
6. Lower height for every building. Do not exceed existing building height.
Eurana High
Fox Hills resident
Letter IND 7D
From: irene french <[email protected]>
Sent: Monday, May 20, 2024 3:16 PM
To: McMorrin, Yasmine <[email protected]>; [email protected] <[email protected]>; Puza, Freddy <[email protected]>; Vera, Albert <[email protected]>; [email protected] <[email protected]>; Culver City Advance Planning Division <[email protected]>; Jones, Stephen <[email protected]>
Subject: Fox hills project
Dear City council and city staff,
For City Council and city staff:
Currently, not every resident in Fox Hills gets notice of the projects that affect us. This due to the 500 ft rule for notice. Depending on the location, NONE of the residents get notice about the projects. The only way people get to know is thru the advocacy groups that work for the neighborhood. Cemeteries, offices, park, are receiving notices and the residents are NOT. The spirit of the law is not met with 500 ft. We must have at least 2000 ft to make sure everyone affected by the change is notified. Also the notice’s is given for transparency. If the developer is asking for an exemption or exception of a law that protects the public, that should be in the notice. Not the law number, but in words that a common person can understand.
The city must protect the residents and always have the residents BEST interest first!
This is a response to the 5700 Hannum EIR. Here are our concerns:
1. Fox Hills current buildings are older and have no capability of adding AC systems. The current cooling system for Fox Hills relies on natural ocean breeze. The most eco- friendly way to cool a unit. All the new development is west or south west of existing buildings and it has a potential of blocking or diverting our current ocean breeze. This could translate to several degrees of increase of heat for the current residents. Related to this issue is the excess height of the new development which will cause further blocking or diversion. Fox Hills asks to add to the EIR study the ocean breeze effect based on the all projects that are happening in Fox Hills. I do not see 5757 Uplander in your study as part of the other projects. There is another one that was not in your list. We need to know what happens to our ocean breeze, i.e. our cooling if you’re building blocks or divert our air flow. The city of Culver City MUST do this study for the Fox Hills residents since the city is changing the density so excessively here. This is the minimum the city can do for the current residents.
2. The EIR shows “Unavoidable Significant Impact”. Question: Why this study did not include the other projects in Fox Hills? One of them is 1106 units (577 Uplander) alone.
If not, the city of Culver City MUST do a new study w/ all the current projects. Not
partial list. HOW DO WE KNOW OF THIS INCOMPLETE REPORT ANALYSIS?: Of the 12 related projects listed in the report link below on Page 82/Table 3.1, (See page 81 that states EIR requirement), the proposed projects at 5757 Uplander Way and 5730 Uplander Way were NOT included. These 2 proposed projects, if built, will result in an additional 1396 units in close proximity to the 5700 Hannum Avenuedevelopment.
3. Message to City Council: Did you read the EIRs that you are asking us the public to comment? Do you know the change that you are deciding to impose in an entire neighborhood? The minimum that the city council can do is to provide a full well done EIR including all the concerns brought up by the residents. Item 1 above is extremely important to the community. A change of 1 or 2 degrees inside our units in the hot summer without AC, can become lethal for the most vulnerable population. Here is a portion of the EIR, please at least read this part: "Significant and unavoidable impact: A significant and unavoidable impact is a substantial adverse effect on the environment that cannot be avoided or mitigated to a less than significant level. A project with significant and unavoidable impacts could still proceed, but the City would be required to prepare a statement of overriding considerations, pursuant to CEQA Guidelines Section 15093, explaining what factors the City considered in approving the project notwithstanding the potential for significant environmental impacts. “ City Council, if your intention is to override our CEQA guidelines (protection that is in place for the public), you must understand and demand all the consequences you are going to impose in Fox Hills.
4. From the EIR "the regional climate within the Air Basin is considered semi-arid and is characterized by warm summers, mild winters, infrequent seasonal rainfall, moderate daytime onshore breezes, and moderate humidity.”….. We can tell you, we live here, we have great air flow. The construction being higher and a massive structures west and south west of us means less air flow. From EIR "The combination of stagnant wind conditions and low inversions produces the greatest pollutant concentrations. “ This is one more reason to study the air flow (ocean breeze) affect. It can cause of air pollutants not moving away from the neighborhood. Remember, we need the ocean breeze that comes from the west to cool us down and move the air pollutants. We have the 405 and major boulevards and high traffic street all around us. This neighborhood is ok now because we have a well balanced nature help but your construction can upset the balance we have now.
5. We ask for Alternative 1 or Alternative 3 (Reduced project alternative)
6. Lower height for every building. Do not exceed existing building height.
Irene French
Fox Hills resident
Letter IND 7E
From: Gabriel Parhoti <[email protected]>
Sent: Monday, May 20, 2024 9:30 PM
To: McMorrin, Yasmine <[email protected]>; O'Brien, Dan <Dan.O'[email protected]>; Puza, Freddy <[email protected]>; Vera, Albert <[email protected]>; Eriksson, Goran <[email protected]>; Culver City Advance Planning Division <[email protected]>; Jones, Stephen <[email protected]> Subject: Concern from Fox Hills (Gabriel Parhoti )
Dear City council and city staff,
For City Council and city staff:
Currently, not every resident in Fox Hills gets notice of the projects that affect us. This due to the 500 ft rule for notice. Depending on the location, NONE of the residents get notice about the projects. The only way people get to know is thru the advocacy groups that work for the neighborhood. Cemeteries, offices, park, are receiving notices and the residents are NOT. The spirit of the law is not met with 500 ft. We must have at least 2000 ft to make sure everyone affected by the change is notified. Also the notice’s is given for transparency. If the developer is asking for an exemption or exception of a law that protects the public, that should be in the notice. Not the law number, but in words that a common person can understand.
The city must protect the residents and always have the residents BEST interest first!
This is a response to the 5700 Hannum EIR. Here are our concerns:
1. Fox Hills current buildings are older and have no capability of adding AC systems. The current cooling system for Fox Hills relies on natural ocean breeze. The most eco- friendly way to cool a unit. All the new development is west or south west of existing buildings and it has a potential of blocking or diverting our current ocean breeze. This could translate to several degrees of increase of heat for the current residents. Related to this issue is the excess height of the new development which will cause further blocking or diversion. Fox Hills asks to add to the EIR study the ocean breeze effect based on the all projects that are happening in Fox Hills. I do not see 5757 Uplander in your study as part of the other projects. There is another one that was not in your list. We need to know what happens to our ocean breeze, i.e. our cooling if you’re building blocks or divert our air flow. The city of Culver City MUST do this study for the Fox Hills residents since the city is changing the density so excessively here. This is the minimum the city can do for the current residents.
2. The EIR shows “Unavoidable Significant Impact”. Question: Why this study did not include the other projects in Fox Hills? One of them is 1106 units (577 Uplander) alone.
If not, the city of Culver City MUST do a new study w/ all the current projects. Not partial list. HOW DO WE KNOW OF THIS INCOMPLETE REPORT ANALYSIS?: Of the 12 related projects listed in the report link below on Page 82/Table 3.1, (See page 81 that states EIR requirement), the proposed projects at 5757 Uplander Way and 5730 Uplander Way were NOT included. These 2 proposed projects, if built, will result in an additional 1396 units in close proximity to the 5700 Hannum Avenue development.
3. Message to City Council: Did you read the EIRs that you are asking us the public to comment? Do you know the change that you are deciding to impose in an entire neighborhood? The minimum that the city council can do is to provide a full well done EIR including all the concerns brought up by the residents. Item 1 above is extremely important to the community. A change of 1 or 2 degrees inside our units in the hot summer without AC, can become lethal for the most vulnerable population. Here is a portion of the EIR, please at least read this part: "Significant and unavoidable impact: A significant and unavoidable impact is a substantial adverse effect on the environment that cannot be avoided or mitigated to a less than significant level. A project with significant and unavoidable impacts could still proceed, but the City would be required to prepare a statement of overriding considerations, pursuant to CEQA Guidelines Section 15093, explaining what factors the City considered in approving the project notwithstanding the potential for significant environmental impacts. “ City Council, if your intention is to override our CEQA guidelines (protection that is in place for the public), you must understand and demand all the consequences you are going to impose in Fox Hills.
4. From the EIR "the regional climate within the Air Basin is considered semi-arid and is characterized by warm summers, mild winters, infrequent seasonal rainfall, moderate daytime onshore breezes, and moderate humidity.”….. We can tell you, we live here, we have great air flow. The construction being higher and a massive structures west and south west of us means less air flow. From EIR "The combination of stagnant wind conditions and low inversions produces the greatest pollutant concentrations. “ This is one more reason to study the air flow (ocean breeze) affect. It can cause of air pollutants not moving away from the neighborhood. Remember, we need the ocean breeze that comes from the west to cool us down and move the air pollutants. We have the 405 and major boulevards and high traffic street all around us. This neighborhood is ok now because we have a well balanced nature help but your construction can upset the balance we have now.
5. We ask for Alternative 1 or Alternative 3 (Reduced project alternative)
6. Lower height for every building. Do not exceed existing building height.
Gabriel Parhoti
Fox Hills resident
Appendix B
Draft EIR Public Meeting
Materials
PUBLIC MEETING ON THE
DRAFT EIR
5700 Hannum Avenue Mixed-Use
Residential and Commerical Project
April 30, 2024
7:00 p.m. – 8:00 p.m.
PLANNING DIVISION
Draft EIR Meeting Objectives
• Provide information about the 5700 Hanum Avenue Mixed-Use Residential and Commercial Project
• Provide information on the CEQA process
• Identify the environmental topics evaluated in the Draft EIR • Summarize impact findings provided in the Draft EIR
• Provide instructions on how to submit comments on the Draft EIR A
ll written comments received on the Draft EIR will be responded to in writing in the Final EIR.
PLANNING DIVISION
Project Site and Vicinity
• Project Site:
5700 H
annum Avenue in Culver
City, California, 90230
• 2.23-ac res (97,264 square feet)
• Bounded:
H
annum Avenue (North)
Buckingham Parkway (East/SE)
Existing commercial uses (West)
• Primary regional access:
I-405 F
reeway 0.7 mile west
PLANNING DIVISION
Existing Conditions
• Fully Developed
• Existing 30,672 square foot, 2-s tory
office building.
• Surface Parking & On-S ite Landscaping.
• Adjoining sidewalks are landscaped with
s
treet trees.
PLANNING DIVISION
Project Description
• New 6-s tory, mixed -use building over two (2) semi-subterranean levels. • 309 residential units (including 27 Very Low-I ncome units) • 5,600 square feet of retail space.
• Building height
70 f
eet along north property line adjacent to Hannum Avenue 71 feet at the south property line along Buckingham Parkway. • 7,507 square foot publicly accessible open space area (Hannum Plaza). • Two primary driveways:
B
uckingham driveway for residential use
Hannum driveway for resident, retail, delivery uses.
• 428 on-s ite vehicle parking spaces & 92 bicycle parking spaces.
PLANNING DIVISION
Conceptual Site Plan
FIRE LANE/ACCESS ROAD
5700 HANNUM AVE
6 STORY RESIDENTIAL BUILDING WITH GROUND FLOOR COMMERCIAL
PROPERTY LINE
FU==L______J ffi z
rJ4'8' 16' 32'1CD
PLANNING DIVISION
North Elevation
View looking south from Hannum Avenue
NORTH ELEVATION
PLANNING DIVISION
East Elevation
View looking west from Buckingham Parkway
PLANNING DIVISION
California Environmental Quality Act (CEQA)
Purpose of CEQA Review:
• To inform decision-m akers and the public of a project’s potential environmental effects
• Increases public understanding of and participation in environmental review pr
ocess
• Discloses potential impacts on the environment
• Identifies ways to avoid or reduce potential environmental impacts through m
itigation measures or alternatives
PLANNING DIVISION
The EIR Process
Prepare Final EIR Including
Response to Comments
EIR Scoping Meeting
September 12, 2023
Prepare Draft EIR
Public & Agency Review of Draft EIR
(47-day review period ends May 20, 2024)
Public Hearings
Prepare Public Notice of Draft EIR Availability
= We are here in the process
Prepare/Distribute Notice of Preparation
(31-day review period ended September 28, 2023)
File Notice of Determination
= Opportunities for Public Input
e~~ CITY
DIVISION
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
•••
*
*
Topics Not Evaluated in the Draft EIR
•Agriculture and Forestry
R
esources
•Biological Resources
•Hazards & Hazardous Materials
•Hydrology and Water Quality
•Mineral Resources
•Utilities and Service Systems
(
Telecommunications,
Wastewater and Solid Waste)
•Wildfire
Topics Found to have no impacts or less than significant impacts in Initial Study
PLANNING DIVISION
Topics Analyzed in the Draft EIR
•Aesthetics
•Air Quality
•Cultural Resources
•Energy
•Geology and Soils ( Paleontological
Resources only)
•Greenhouse Gas Emissions
•Land Use and Planning
•Noise
•Population and Housing
•Public Services
(Fire a
nd Police Protection,
Schools, and Parks/Recreation)
•Transportation
•Tribal Cultural Resources
•Utilities and Service Systems
(W
ater Supply, Electricity and
Natural Gas Facilities)
PLANNING DIVISION
Draft EIR Topics with Less than Significant Impacts
• Aesthetics
• Air Quality (Operation)
• Energy
• Greenhouse Gas Emissions
• Land Use and Planning
• Noise and Vibration
– Operational Noise
– Construction/Operation Vibration
• Population and Housing
• Public Services
(
Fire and Police Protection,
Schools and Parks/Recreation)
• Transportation
• Utilities and Service Systems –
W
ater Supply, Wastewater, Solid
Waste, Electricity and Natural
Gas Facilities
PLANNING DIVISION
Draft EIR Topics with Significant Impacts Requiring Mitigation Measures •Air Quality – Con struction Related Emissions
•Cultural Resources – A rchaeological Resources
•Geology and Soils – P aleontological Resources
•Tribal Cultural Resources
After implementation of Mitigation Measures, impacts for these topics were reduced to less than significant levels:
PLANNING DIVISION
Draft EIR Topics with Significant and Unavoidable Impacts – Construction Related Only
•Noise – On- Site Construction Noise
•Significant and unavoidable impact would occur during the earthwork s
horing/excavation, concrete pours (mat foundation and deck pours) and tower crane erection/disassembly phases of construction only if these construction activities occurred outside of the City’s allowable construction hours and an extended hours construction permit was not obtained.
•However, the construction noise impact would be less than significant i
f an extended hours construction permit is obtained.
After implementation of Mitigation Measures, impacts for these topics were still significant and unavoidable:
PLANNING DIVISION
Draft EIR Availability
The Draft EIR is currently available at the following locations:
• Online at: https://www.culvercity.org/Active-Projects/5700-Hannum-Ave-Proposed-Project • In-per son at: Culver City Current Planning Division counter Current Planning Division Office, City Hall, Second Floor 9770 Culver Boulevard
Culver City, CA 90232-0507
Business hours are 7:30 A.M. – 5:30 P.M., Monday through Friday, except alternate Fridays Telephone in advance to assure staff availability at (310) 253-5710 • In-per
son at: Culver City Julian Dixon Library (see library website for address and hours of operation)
PLANNING DIVISION
Submittal of Public Comments on the Draft EIR
Due date for public comments on
the Draft EIR:
5:30 p.m. on Monday, May 20, 2024
Please direct public comments on
the Draft EIR to:
Jose Mendivil, Associate Planner
City of Culver City Planning Division
9770 Culver Boulevard
Culver City, California 90230
Email: [email protected]
Reference:
5700 Hannum Avenue Mixed-Use
Residential and Commercial Project Draft
EIR
0 PLANNING DIVISION
Public Comment Period
Oral Comments:
Zoom
• Mouse over the bottom of the Zoom
window
• Click “Raise Hand” button
• Wait until moderator calls your name and
unmut
es you
By Phone
• Dial *9 t o raise your hand and *6 to unmute
NOTE: There will be a one minute time limit for oral
comments. After you have had your turn to speak, your hand will be lowered and you will be placed back on mute.
0 ~
'
Chat Raise Hand
PLANNING DIVISION
Submittal of Public Comments on the Draft EIR
Due date for public comments on
the Draft EIR:
5:30 p.m. on Monday, May 20, 2024
Please direct public comments on
the Draft EIR to:
Jose Mendivil, Associate Planner
City of Culver City Planning Division
9770 Culver Boulevard
Culver City, California 90230
Email: [email protected]
Reference:
5700 Hannum Avenue Mixed-Use
Residential and Commercial Project Draft
EIR
0 PLANNING DIVISION
5700 HANNUM MIXED-USE RESIDENTIAL AND
COMMERCIAL PROJECT
Draft Environmental Impact Report
State Clearinghouse No. 2023080709
Prepared for April 2024
City of Culver City
9770 Culver Blvd.
Culver City, CA 90232
Culver City Case Nos:
P2023-0218-CP; -DOBI; -ZCMA; -GPMA; -EIR
r ESA
~
5700 HANNUM MIXED-USE RESIDENTIAL AND
COMMERCIAL PROJECT
Draft Environmental Impact Report
State Clearinghouse No. 2023080709
Prepared for April 2024
City of Culver City
9770 Culver Blvd.
Culver City, CA 90232
Culver City Case Nos:
P2023-0218-CP; -DOBI; -ZCMA; -GPMA; -EIR
626 Wilshire Boulevard
Suite 1100
Los Angeles, CA 90017
213.599.4300
esassoc.com
Atlanta
Bend
Irvine
Los Angeles
Mobile
Oakland
Orland
Palm Beach County
Pasadena
Pensacola
Petaluma
Portland
Rancho Cucamonga
Sacramento
San Diego
San Francisco
San Jose
Sarasota
Seattle
Tampa
Thousand Oaks
OUR COMMITMENT TO SUSTAINABILITY | ESA helps a variety of public and private sector clients plan and prepare for climate change and emerging regulations that limit GHG emissions. ESA is a registered assessor with the California Climate Action Registry, a Climate Leader, and founding reporter for the Climate Registry. ESA is also a corporate member of the U.S. Green Building Council and the Business Council on Climate Change (BC3). Internally, ESA has adopted a Sustainability Vision and Policy Statement and a plan to reduce waste and energy within our operations. This document was produced using recycled paper.
City of Culver City i 5700 Hannum Avenue Mixed-Use Residential and Commercial Project SCH No. 2023080709 April 2024
TABLE OF CONTENTS
5700 Hannum Avenue Mixed-Use Residential
and Commercial Project
Page
Executive Summary ........................................................................................................ ES-1 ES.1 Project Description ....................................................................................... ES-1 ES.2 Issues Raised during Notice of Preparation Process and Areas of Controversy ................................................................................................. ES-2 ES.3 Significant and Unavoidable Environmental Impacts ................................... ES-3 ES.4 Alternatives that Would Reduce or Avoid Significant Impacts ..................... ES-3 ES.4.1 Alternative 1: No Project ............................................................... ES-3 ES.4.2 Alternative 2: Existing Zoning Alternative ..................................... ES-4 ES.4.3 Alternative 3: Reduced Project Alternative ................................... ES-4 ES.4.4 Environmentally Superior Alternative ........................................... ES-5 ES.5 Summary of Environmental Impacts ............................................................ ES-6 ES.5.1 Project Design Features ............................................................. ES-11 ES.5.2 Mitigation Measures ................................................................... ES-17 Chapter 1, Introduction ...................................................................................................... 1-1
1.1 Purpose of the Draft EIR ................................................................................. 1-1
1.2 EIR Scoping Process ...................................................................................... 1-2
1.2.1 Initial Study ...................................................................................... 1-2
1.2.2 Notice of Preparation ....................................................................... 1-3
1.2.3 EIR Scoping Meeting/Community Meeting ...................................... 1-4
1.2.4 Comments Received ....................................................................... 1-4
1.3 Format of the Draft EIR ................................................................................... 1-4
1.4 Public Review of the Draft EIR ........................................................................ 1-6 Chapter 2, Project Description .......................................................................................... 2-1
2.1 Introduction ..................................................................................................... 2-1
2.2 Project Location and Surrounding Uses ......................................................... 2-1
2.3 Existing Conditions ......................................................................................... 2-4
2.4 General Plan Land Use and Zoning ................................................................ 2-5
2.5 Statement of Project Objectives ...................................................................... 2-5
2.6 Description of Proposed Project ..................................................................... 2-6
2.6.1 Project Overview ............................................................................. 2-6
2.6.2 Architectural Design ........................................................................ 2-9
2.6.3 Building Floor Plans and Project Uses .......................................... 2-15
2.6.4 Building Elevations and Sections .................................................. 2-21
2.6.5 Open Space and Landscaping ...................................................... 2-21
2.6.6 Vehicular and Bicycle Access, Circulation, and Parking ................ 2-27
2.6.7 Lighting and Signage ..................................................................... 2-29
2.6.8 Site Security .................................................................................. 2-29 Table of Contents
Page
City of Culver City ii 5700 Hannum Avenue Mixed-Use Residential and Commercial Project SCH No. 2023080709 April 2024
2.6.9 Sustainability Features .................................................................. 2-30
2.6.10 Anticipated Construction Schedule/Activities ................................ 2-30
2.7 Project Design Features ............................................................................... 2-31
2.8 Anticipated Project Approvals ....................................................................... 2-36 Chapter 3, Environmental Setting ..................................................................................... 3-1
3.1 Overview of Environmental Setting ................................................................. 3-1
3.1.1 On-Site Conditions .......................................................................... 3-1
3.1.2 Surrounding Uses ............................................................................ 3-2
3.2 Related Projects ............................................................................................. 3-2 Chapter 4, Environmental Impacts Analysis ................................................................... 4-1
4.0 Environmental Impacts Analysis ..................................................................... 4-1
4.0.1 Introduction...................................................................................... 4-1
4.0.2 Environmental Impact ...................................................................... 4-2
4.0.3 Terminology Used in This EIR ......................................................... 4-3
4.1 Aesthetics .................................................................................................... 4.1-1
4.1.1 Introduction................................................................................... 4.1-1
4.1.2 Environmental Setting .................................................................. 4.1-1
4.1.3 Project Impacts ............................................................................. 4.1-9
4.2 Air Quality .................................................................................................... 4.2-1
4.2.1 Introduction................................................................................... 4.2-1
4.2.2 Environmental Setting .................................................................. 4.2-1
4.2.3 Project Impacts ........................................................................... 4.2-25
4.3 Cultural Resources – Archaeological Resources ......................................... 4.3-1
4.3.1 Introduction................................................................................... 4.3-1
4.3.2 Environmental Setting .................................................................. 4.3-1
4.3.3 Environmental Impacts ............................................................... 4.3-14
4.4 Energy ......................................................................................................... 4.4-1
4.4.1 Introduction................................................................................... 4.4-1
4.4.2 Environmental Setting .................................................................. 4.4-1
4.4.3 Environmental Impacts ............................................................... 4.4-15
4.5 Geology and Soils – Paleontological Resources ......................................... 4.5-1
4.5.1 Introduction................................................................................... 4.5-1
4.5.2 Environmental Setting .................................................................. 4.5-1
4.5.3 Environmental Impacts ................................................................. 4.5-7
4.6 Greenhouse Gas Emissions ........................................................................ 4.6-1
4.6.1 Introduction................................................................................... 4.6-1
4.6.2 Environmental Setting .................................................................. 4.6-1
4.6.3 Project Impacts ........................................................................... 4.6-37
4.7 Land Use and Planning ............................................................................... 4.7-1
4.7.1 Introduction................................................................................... 4.7-1
4.7.2 Environmental Setting .................................................................. 4.7-1
4.7.3 Environmental Impacts ............................................................... 4.7-10
4.8 Noise ........................................................................................................... 4.8-1
4.8.1 Introduction................................................................................... 4.8-1
4.8.2 Noise and Vibration Basics .......................................................... 4.8-1
4.8.3 Environmental Setting .................................................................. 4.8-7
4.8.4 Existing Conditions ..................................................................... 4.8-13
4.8.5 Environmental Impacts ............................................................... 4.8-20 Table of Contents
Page
City of Culver City iii 5700 Hannum Avenue Mixed-Use Residential and Commercial Project SCH No. 2023080709 April 2024
4.9 Population and Housing ............................................................................... 4.9-1
4.9.1 Introduction................................................................................... 4.9-1
4.9.2 Environmental Setting .................................................................. 4.9-1
4.9.3 Environmental Impacts ................................................................. 4.9-9
4.10.1 Public Services – Fire Protection ............................................................ 4.10.1-1
4.10.1.1 Introduction.............................................................................. 4.10.1-1
4.10.1.2 Environmental Setting ............................................................. 4.10.1-1
4.10.1.3 Environmental Impacts .......................................................... 4.10.1-12
4.10.2 Public Services – Police Protection ........................................................ 4.10.2-1
4.10.2.1 Introduction.............................................................................. 4.10.2-1
4.10.2.2 Environmental Setting ............................................................. 4.10.2-1
4.10.2.3 Environmental Impacts ............................................................ 4.10.2-5
4.10.3 Public Services – Schools....................................................................... 4.10.3-1
4.10.3.1 Introduction.............................................................................. 4.10.3-1
4.10.3.2 Environmental Setting ............................................................. 4.10.3-1
4.10.3.3 Environmental Impacts ............................................................ 4.10.3-3
4.10.4 Public Services – Parks and Recreation ................................................. 4.10.4-1
4.10.4.1 Introduction.............................................................................. 4.10.4-1
4.10.4.2 Environmental Setting ............................................................. 4.10.4-1
4.10.4.3 Environmental Impacts ............................................................ 4.10.4-7
4.11 Transportation ............................................................................................ 4.11-1
4.11.1 Introduction................................................................................. 4.11-1
4.11.2 Environmental Setting ................................................................ 4.11-1
4.11.3 Environmental Impacts ............................................................. 4.11-13
4.12 Tribal Cultural Resources .......................................................................... 4.12-1
4.12.1 Introduction................................................................................. 4.12-1
4.12.2 Environmental Setting ................................................................ 4.12-1
4.12.3 Project Impacts ........................................................................... 4.12-7
4.13.1 Utilities and Service Systems – Water Supply ........................................ 4.13.1-1
4.13.1.1 Introduction.............................................................................. 4.13.1-1
4.13.1.2 Environmental Setting ............................................................. 4.13.1-1
4.13.1.3 Project Impacts ...................................................................... 4.13.1-14
4.13.2 Utilities and Service Systems – Electric Power, Natural Gas, and Telecommunications Facilities ................................................................ 4.13.2-1
4.13.2.1 Introduction.............................................................................. 4.13.2-1
4.13.2.2 Environmental Setting ............................................................. 4.13.2-1
4.13.2.3 Environmental Impacts ............................................................ 4.13.2-6 Chapter 5, Alternatives ...................................................................................................... 5-1
5.1 Introduction ..................................................................................................... 5-1
5.2 Objectives of the Project ................................................................................. 5-2
5.3 Overview of Alternatives Selected for Analysis ............................................... 5-3
5.4 Alternatives Considered and Rejected ............................................................ 5-3
5.4.1 Alternative Off-Site Location ............................................................ 5-4
5.4.2 Alternatives to Further Reduce or Avoid Significant Noise Impacts during Construction ............................................................ 5-5
5.5 Analysis Format .............................................................................................. 5-6
5.5.1 Alternative 1: No Project/No Build Alternative ................................. 5-7
5.5.2 Alternative 2: Existing Zoning Alternative ...................................... 5-15
5.5.3 Alternative 3: Reduced Project Alternative .................................... 5-34
5.6 Environmentally Superior Alternative ............................................................ 5-52 Table of Contents
Page
City of Culver City iv 5700 Hannum Avenue Mixed-Use Residential and Commercial Project SCH No. 2023080709 April 2024
Chapter 6, Other CEQA Considerations ........................................................................... 6-1
6.1 Significant Unavoidable Impacts ..................................................................... 6-1
6.2 Reasons Why the Project Is Being Proposed, Notwithstanding Significant Unavoidable Impacts ..................................................................... 6-1
6.3 Irreversible Environmental Changes ............................................................... 6-4
6.4 Growth-Inducing Impacts ................................................................................ 6-6
6.5 Potential Secondary Effects Related to Project Mitigation Measures ............. 6-7
6.5.1 Air Quality ........................................................................................ 6-7
6.5.2 Cultural Resources – Archaeological Resources ............................ 6-8
6.5.3 Geology and Soils – Paleontological Resources ............................. 6-8
6.5.4 Noise ............................................................................................... 6-8
6.5.5 Tribal Cultural Resources ................................................................ 6-8
6.6 Impacts Found Not to Be Significant ............................................................... 6-9 Chapter 7, References ....................................................................................................... 7-1 Chapter 8, List of EIR Preparers and Organizations and Persons Contacted .............. 8-1
8.1 Lead Agency ................................................................................................... 8-1
8.2 Project Applicant ............................................................................................. 8-1
8.3 Environmental Impact Report Preparation ...................................................... 8-1
8.4 Agencies Consulted ........................................................................................ 8-3 Chapter 9, Standard Terms, Acronyms, and Abbreviations ........................................... 9-1
Figures
Figure 2-1 Regional and Project Vicinity Location ....................................................... 2-2 Figure 2-2 Project Location – Aerial Photograph ......................................................... 2-3 Figure 2-3 Conceptual Site Plan .................................................................................. 2-7 Figure 2-4 Conceptual Project Rendering – Hannum Plaza Looking West ............... 2-10 Figure 2-5 Conceptual Project Rendering – Hannum Plaza Looking East ................ 2-11 Figure 2-6 Conceptual Project Rendering – Northeast Corner of Hannum Avenue and Buckingham Parkway ........................................................... 2-12 Figure 2-7 Conceptual Project Rendering – Looking West from Fox Hills Parkette .................................................................................................... 2-13 Figure 2-8 Conceptual Project Rendering – Looking North Along Buckingham Parkway ............................................................................... 2-14 Figure 2-9 Level P1 Plan ........................................................................................... 2-16 Figure 2-10 Level P2 Plan ........................................................................................... 2-17 Figure 2-11 First Floor Plan ......................................................................................... 2-18 Figure 2-12 Second Floor Plan .................................................................................... 2-19 Figure 2-13 Sixth Floor Plan ........................................................................................ 2-20 Figure 2-14 North and West Elevations ....................................................................... 2-22 Figure 2-15 East Elevation .......................................................................................... 2-23 Figure 2-16 South Elevation ........................................................................................ 2-24 Figure 2-17 Building Sections ...................................................................................... 2-25 Figure 3-1 Related Projects Map ................................................................................. 3-5 Figure 4.2-1 SCAQMD General Forecast Areas and Air Monitoring Areas ............... 4.2-20 Figure 4.2-2 MATES Cancer Risk ............................................................................. 4.2-21 Figure 4.2-3 Air Quality Sensitive Receptors ............................................................. 4.2-24 Figure 4.7-1 Project Site and Surrounding Land Use Designations ............................. 4.7-8 Figure 4.7-2 Zoning on the Project Site and in the Surrounding Area ......................... 4.7-9 Table of Contents
Page
City of Culver City v 5700 Hannum Avenue Mixed-Use Residential and Commercial Project SCH No. 2023080709 April 2024
Figure 4.8-1 Decibel Scale and Common Noise Sources ............................................ 4.8-3 Figure 4.8-2 Guidelines for Noise Compatible Land Use ........................................... 4.8-10 Figure 4.8-3 Surrounding Land Uses and Noise Measurement Locations ................ 4.8-16 Figure 4.10.1-1 Culver City Fire Department Stations ................................................. 4.10.1-8 Figure 4.10.4-1 Culver City Parks and Recreational Facilities Located in the Vicinity of the Project Site ................................................................... 4.10.4-6 Figure 4.11-1 Existing Transit Service ....................................................................... 4.11-12 Figure 4.11-2 Existing Bicycle Facilities .................................................................... 4.11-14
Tables
Table ES-1 Summary of Project Impacts, Project Design Features, and Mitigation Measures ................................................................................ ES-7 Table 2-1 Development Program Summary ............................................................... 2-8 Table 2-2 Summary of Project Design Features ....................................................... 2-31 Table 3-1 Related Projects List .................................................................................. 3-4 Table 4.2-1 Ambient Air Quality Standards ................................................................ 4.2-8 Table 4.2-2 South Coast Air Basin Attainment Status (Los Angeles County) ........... 4.2-17 Table 4.2-3 Ambient Air Quality Data ....................................................................... 4.2-19 Table 4.2-4 Estimated Existing Emissions (pounds per day) .................................... 4.2-22 Table 4.2-5 SCAQMD Regional Emissions Thresholds (pounds per day) ............... 4.2-26 Table 4.2-6 Estimated Maximum Unmitigated Regional Construction Emissions (pounds per day) .................................................................. 4.2-44
Table 4.2-7 Estimated Maximum Unmitigated Regional Operational Emissions (pounds per day) .................................................................. 4.2-45
Table 4.2-8 Estimated Maximum Unmitigated Localized Construction Emissions (pounds per day) ................................................................. 4.2-47
Table 4.2-9 Estimated Maximum Localized Operational Emissions – Project (pounds per day) ................................................................................... 4.2-47 Table 4.2-10 Maximum Unmitigated Health Risk Impacts for Off-Site Sensitive and Commercial Receptors ................................................................... 4.2-49 Table 4.2-11 Maximum Mitigated Health Risk Impacts for Off-Site Sensitive Receptors .............................................................................................. 4.2-51 Table 4.2-12 Related Projects within 1,000 Feet of the Project Site ........................... 4.2-52 Table 4.3-1 Previously Recorded Cultural Resources .............................................. 4.3-12 Table 4.4-1 Existing Annual Regional Energy Use ................................................... 4.4-12 Table 4.4-2 Electric Power Mix Delivered to Retail Customers in 2021 .................... 4.4-13 Table 4.4-3 Existing Site Annual Energy Use ........................................................... 4.4-15 Table 4.4-4 Summary of Energy Use During Project Construction ........................... 4.4-20 Table 4.4-5 Summary of Annual Net New Energy Use During Project Operation .............................................................................................. 4.4-22
Table 4.6-1 Estimated Statewide Greenhouse Gas Emissions Reductions in the 2022 Scoping Plan ............................................................................ 4.6-9
Table 4.6-2 Major Climate Legislation and Executive Orders Enacted Since the 2017 Scoping Plan .......................................................................... 4.6-10
Table 4.6-3 Description of Identified GHGs .............................................................. 4.6-29 Table 4.6-4 Atmospheric Lifetimes and GWPs ......................................................... 4.6-30 Table 4.6-5 State of California GHG Emissions ....................................................... 4.6-36 Table 4.6-6 Estimated Existing Project Site GHG Emissions ................................... 4.6-37 Table of Contents
Page
City of Culver City vi 5700 Hannum Avenue Mixed-Use Residential and Commercial Project SCH No. 2023080709 April 2024
Table 4.6-7 Consistency with Applicable SCAG Connect SoCal Actions and Strategies .............................................................................................. 4.6-62 Table 4.6-8 Project Construction GHG Emissions .................................................... 4.6-65 Table 4.6-9 Estimated Annualized Unmitigated Project GHG Emissions ................. 4.6-67 Table 4.7-1 Consistency of the Project with Applicable Goals of Connect SoCal .................................................................................................... 4.7-12
Table 4.7-2 Comparison of the Project to Applicable Policies of the Culver City General Plan .................................................................................. 4.7-17 Table 4.7-3 Comparison of the Project to Applicable Policies of the Culver City Bicycle & Pedestrian Action Plan ................................................... 4.7-25
Table 4.8-1 Construction Vibration Damage Criteria .................................................. 4.8-8 Table 4.8-2 Groundborne Vibration and Groundborne Noise Impact Criteria for General Assessment ......................................................................... 4.8-9
Table 4.8-3 City of Culver City Noise Standards ...................................................... 4.8-12 Table 4.8-4 Summary of Ambient Noise Measurements .......................................... 4.8-17 Table 4.8-5 Predicted Existing Vehicular Traffic Noise Levels ................................. 4.8-19 Table 4.8-6 Construction Equipment Noise Levels ................................................... 4.8-26 Table 4.8-7 Estimated Construction Noise Levels at Existing Off-Site Sensitive Receptors .............................................................................. 4.8-28 Table 4.8-8 Estimated Construction Noise Levels at Commercial Land Uses .......... 4.8-28 Table 4.8-9 Estimate of Off-Site Construction Traffic Noise Levels .......................... 4.8-29 Table 4.8-10 Mechanical Equipment Noise Levels at Noise Sensitive Receptors .............................................................................................. 4.8-31 Table 4.8-11 On-Site Parking Noise Levels at Noise Sensitive Receptors ................. 4.8-32 Table 4.8-12 Loading Areas and Refuse Collection Noise Levels .............................. 4.8-33 Table 4.8-13 Offsite Traffic Noise Impacts – Existing Plus Project Conditions ........... 4.8-33 Table 4.8-14 Offsite Traffic Noise Impacts – Future Plus Project Conditions ............. 4.8-35 Table 4.8-15 Estimated Daytime Outdoor Open Space Noise Levels (Leq) ............... 4.8-37 Table 4.8-16 On-Site Composite Noise Impacts ........................................................ 4.8-39 Table 4.8-17 Operational Noise Levels at Commercial Land Uses ............................ 4.8-39 Table 4.8-18 Estimated Mitigated Construction Noise Levels at Existing Off- Site Sensitive Receptors ....................................................................... 4.8-40 Table 4.8-19 Vibration Source Levels for Construction Equipment ............................ 4.8-41 Table 4.8-20 Related Projects within 1,000 Feet of the Project Site ........................... 4.8-44 Table 4.9-1 Projected Population, Housing, and Employment Estimates ................... 4.9-9 Table 4.9-2 Projected Increases in Population, Housing, and Employment ............. 4.9-11 Table 4.9-3 Projected Population, Housing, and Employment Increases for the City .................................................................................................. 4.9-12 Table 4.9-4 Related Projects Housing, Population and Employment ....................... 4.9-15 Table 4.9-5 Cumulative Population, Housing and Employment Growth For City ........................................................................................................ 4.9-16 Table 4.10.1-1 CCFD Fire Stations Located in the Vicinity of the Project Site ........... 4.10.1-9 Table 4.10.1-2 CCFD Response Times ................................................................... 4.10.1-11 Table 4.10.2-1 Culver City 2022 Crime Statistics ....................................................... 4.10.2-5 Table 4.10.3-1 Enrollment of CCUSD Schools Serving the Project Site .................... 4.10.3-3 Table 4.10.3-2 Estimated Number of Students Generated by the Project .................. 4.10.3-5 Table 4.10.3-3 Cumulative Student Generation ......................................................... 4.10.3-8 Table 4.10.4-1 Culver City Parks and Recreation Master Plan - Park and Open Space Classifications ......................................................................... 4.10.4-3 Table 4.10.4-2 Culver City Parks In a Two-Mile Radius of the Project Site ................ 4.10.4-5 Table of Contents
Page
City of Culver City vii 5700 Hannum Avenue Mixed-Use Residential and Commercial Project SCH No. 2023080709 April 2024
Table 4.11-1 Consistency of the Project with Applicable Policies of the Circulation Element ............................................................................. 4.11-22 Table 4.11-2 Consistency of the Project with Applicable Action of the Culver City Bicycle & Pedestrian Action Plan ................................................. 4.11-24 Table 4.11-3 Consistency of the Project with Applicable Policies of the Complete Streets Policy ...................................................................... 4.11-25 Table 4.13.1-1 Existing Estimated Water Consumption ........................................... 4.13.1-11 Table 4.13.1-2 Project’s Estimated Water Consumption .......................................... 4.13.1-18 Table 4.13.1-3 Projected Normal Year Water Supply and Demand for Culver City Service Area .............................................................................. 4.13.1-18 Table 4.13.1-4 Single Dry Year Water Supply and Demand for Culver City Service Area ..................................................................................... 4.13.1-18
Table 4.13.1-5 Multiple (Five) Consecutive Dry Years Water Supply and Demand through 2045 for Culver City Service Area ......................... 4.13.1-19
Table 4.13.1-6 Estimated Cumulative Water Generation by Related Projects ......... 4.13.1-22 Table 5-1 Overview of the Project Alternatives ........................................................... 5-4 Table 5-2 Alternative 2 Student Generation ............................................................. 5-28 Table 5-3 Alternative 2 Estimated Water Consumption ............................................ 5-32 Table 5-4 Alternative 3 Estimated Water Consumption ............................................ 5-50 Table 5-5 Comparison of Impacts Associated with the Alternatives and the Project ...................................................................................................... 5-53
Table 5-6 Ability of Alternatives to Meet Project Objectives ..................................... 5-57
Appendices
Appendix A Notice of Preparation (NOP), Initial Study, Scoping Meeting Materials, and Comments on the NOP
A-1 Notice of Preparation
A-2 Initial Study
A-3 Scoping Meeting Materials
A-4 Comments on the NOP
Appendix B Shadow Figures
Appendix C Air Quality and Greenhouse Gas Emissions Calculations Appendix D Archeological Resources Report
Appendix E Energy Calculations
Appendix F Paleontological Resources Report
Appendix G Noise Calculations
Appendix H Public Services Correspondence
H-1 Culver City Fire Department Correspondence
H-2 Culver City Police Department Correspondence
H-3 Culver City Unified School District Correspondence
H-4 Culver City Parks, Recreation and Community Services Department Correspondence
Appendix I Transportation Impact Study
Appendix J Water Civil Technical Memorandum
Appendix K Alternatives Documentation
Table of Contents
City of Culver City viii 5700 Hannum Avenue Mixed-Use Residential and Commercial Project SCH No. 2023080709 April 2024
This page intentionally left blank
City of Culver City ES-1 5700 Hannum Avenue Mixed-Use Residential and Commercial Project SCH No. 2023080709 April 2024
EXECUTIVE SUMMARY
This Draft Environmental Impact Report (Draft EIR) has been prepared pursuant to the requirements of the California Environmental Quality Act (CEQA, Public Resources Code Sections 21000 et. seq.) in accordance with CEQA Guidelines Section 15123. Accordingly, this chapter of the Draft EIR includes (1) a brief description of the Project; (2) issues raised during the Notice of Preparation (NOP) process, including areas of controversy known to the lead agency; (3) identification of potentially significant impacts and proposed mitigation measures or alternatives that would reduce or avoid those impacts; and (4) issues to be resolved, including the choice among alternatives and whether and how to mitigate the potential significant impacts.
ES.1 Project Description
This Draft Environmental Impact Report (EIR) has been prepared for the 5700 Hannum Project (Project). 5700 Hannum Owner, LLC c/o Lincoln Property Company, the Applicant, proposes to develop a mixed-use residential and commercial project on an approximately 2.23 -acre (97,264 square feet [sf]) site (Project Site) located at 5700 Hannum Avenue within the Fox Hills neighborhood of the City of Culver City (City). The Project Site is currently developed with an existing two-story office building in the northern portion of the Project Site and associated surface parking. The Project would develop a new 6-story (up to a height 78-feet) mixed-use building with two (2) semi -subterranean levels, consisting of 309 residential units (including 27 Very Low Income units) and 5,600 square feet of retail space. The Project would provide a total of 7,507 square feet of publicly accessible open space, 19,526 square feet of private open space and 27,123 square feet of common open space (for residents) for a total of 54,156 squar e feet of open space.
The building would be constructed atop two levels of semi -subterranean vehicular parking, with parking also provided on the first floor of the building. The Project would include a total of 428 vehicular parking spaces (399 residential, 6 guest and 23 commercial) within three parking levels.
Two points of vehicular access would be provided to the Project Site, including a residential only driveway along Buckingham Parkway and a commercial and residential driveway along Hannum Avenue. The Project would also provide a total of 92 bicycle spaces, consisting of 11 short -term and 81 long-term bicycle parking spaces in compliance with Culver City Municipal Code (CCMC) requirements. The Project would also include private and publicly accessibl e open space. The Project would provide 7,507 square feet of publicly accessible open space as part of the Hannum Plaza fronting Hannum Avenue. Common open space available to residents only would include a centrally located courtyard, a community room on the second floor; a gym, an amenity deck, and a community room on the sixth floor.
The Project is proposing to change the Project Site’s zoning designation from Commercial Regional Business Park to Planned Development (PD) with adoption of a Comprehensive Plan that would serve as the overarching entitlement mechanism for the Project Site. To achieve the Project’s Executive Summary
City of Culver City ES-2 5700 Hannum Avenue Mixed-Use Residential and Commercial Project SCH No. 2023080709 April 2024
proposed density and mix of uses, a General Plan Amendment Map would be needed to designate the Project Site from Regional Center to General Corridor. The Project is also requesting Density and Other Bonus Incentives (DOBI) to allow for Increased Density with affordable units incorporated into the Project; and approval for Extended Hours of Construction (CCMC Section
9.07.035.C.1). In addition, the Project would require ministerial permits including but not limited to demolition, grading, building, haul route and engineering permits.
ES.2 Issues Raised during Notice of Preparation
Process and Areas of Controversy
The following lists potential environmental issues or concerns raised in response to the NOP circulation, the comment period for which extended from August 29, 2023 through September 28, 2023, and during the virtual Community Meeting and EIR Scoping Meeting held on September 12, 2023. The NOP comments are contained in Appendix A-3 of this Draft EIR. • Concerns regarding the population and allowable housing density on the Project Site (Refer to Chapter 2, Project Description , Section 4.7, Land Use and Planning, and Section 4.9, Population and Housing, of this Draft EIR.)
• Concerns regarding consistency with the Project’s zoning and General Plan land use designations (Refer to Chapter 2, Project Description, and Section 4.7, Land Use and Planning, of this Draft EIR.)
• Concerns regarding aesthetics impacts of the Project, including those related to massing and scale and shading (Refer to Appendix A, Initial Study , which addresses aesthetic impacts and Section 4.1, Aesthetics, of this Draft EIR.)
• Concerns regarding lighting impacts (Refer to Appendix A, Initial Study , of this Draft EIR, which addresses aesthetic impacts associated with lighting.) • Concerns regarding impacts related to air quality and greenhouse gas emissions, including impacts related to human health and carbon emissions (Refer to Section 4.2, Air Quality, and Section 4.6, Greenhouse Gas Emissions, of this Draft EIR.) • Concerns regarding energy and capacity of energy related infrastructure to accommodate the Project (Refer to Section 4.4, Energy, and 4.13.2, Utilities and Service Systems - Electric Power, Natural Gas, and Telecommunications Facilities, of this Draft EIR.) • Concerns regarding noise impacts (Refer to Section 4.8, Noise, of this Draft EIR.) • Concerns regarding impacts to public services, such as police, fire schools and parks (Refer to Sections 4.10.1 to 4.10.4, Public Services, of this Draft EIR.) • Concerns regarding transportation, parking and traffic impacts (Refer to Section 4.11, Transportation, of this Draft EIR.)
• Concerns regarding impacts to tribal cultural resources (Refer to Section 4.12, Tribal Cultural Resources, of this Draft EIR.)
• Concerns regarding ability of existing utilities to accommodate the Project, such as water, sewer electric, gas, cable, etc. (Refer to Appendix A, Initial Study , of this Draft EIR, which addresses impacts to utilities, as well as Section 13.1 , Utilities and Service Systems - Water Supply, and 4.13.2, Utilities and Service Systems - Electric Power, Natural Gas, and Telecommunications Facilities, of this Draft EIR.)
Executive Summary
City of Culver City ES-3 5700 Hannum Avenue Mixed-Use Residential and Commercial Project SCH No. 2023080709 April 2024
• Concerns regarding cumulative impacts (Refer to Sections 4.1 to 4.13 of this Draft EIR, all of which address cumulative impacts for each their respective issue areas.) • Identification of alternatives that reduce the Project’s environmental impacts (Refer to Chapter 5, Alternatives, of this Draft EIR)
• Concerns related to biological resources, including impacts to endangered species (Refer to Appendix A, Initial Study, of this Draft EIR, which addresses impact to biological resources.) • Concerns regarding impacts to historical resources (Refer to Appendix A, Initial Study, of this Draft EIR, which addresses cultural resources impacts, including impacts to historic resources.) ES.3 Significant and Unavoidable Environmental
Impacts
CEQA Guidelines Section 15126.2(a) requires that an EIR describe significant environmental impacts of a project on the environment. Direct and indirect significant effects shall be clearly identified and described, giving due consideration to short-term and long-term effects. As evaluated in Section 4. 8, Noise, of this Draft EIR, and summarized below, implementation of the Project would result in significant impacts that cannot be mitigated with respect to Project-level on-site construction noise impacts.
Implementation of Mitigation Measures MM-NOI-1 (Sound Walls) and MM-NOI-2 (Construction Practices) would reduce the Project’s on-site construction noise impacts at the off-site ground-level noise sensitive receptors, to the extent technically feasible. 1 With implementation of Mitigation
Measures MM-NOI-1 and MM-NOI-2, the construction noise levels at all receptor locations would be reduced below the 5-dBA significance threshold. Therefore, with implementation of mitigation measures MM-NOI-1 and MM-NOI-2, impacts from on-site construction noise would be less than significant with approval of an extended hours construction permit. However, construction during off-hours (between 7:00 a.m. and 8:00 a.m. Monday to Friday and 7:00 a.m. to 9:00 a.m. on Saturdays ) during the earthwork shoring/excavation, concrete pours (mat foundation and deck pours) and tower crane erection/disassembly phases of construction would remain significant and unavoidable if an extended hours permit was not obtained by the Project because they would occur outside of the City’s allowable construction hours.
ES.4 Alternatives that Would Reduce or Avoid
Significant Impacts
ES.4.1 Alternative 1: No Project
In accordance with the CEQA Guidelines, the No Project/No Build Alternative (Alternative 1) for a development project on an identifiable property consists of the circumstance under which the project does not proceed. CEQA Guidelines Section 15126.6(e)(3)(B) states that, “in certain instances, Alternative 1 means ‘no build’ wherein the existing environmental setting is
1 Technical infeasibility shall mean that said noise limitations cannot be complied with despite the use of mufflers, shields, sound barriers, and/or other noise reduction devices or techniques during the operation of the equipment.
LAMC Chapter XI, Art. 1, Section 112.05.
Executive Summary
City of Culver City ES-4 5700 Hannum Avenue Mixed-Use Residential and Commercial Project SCH No. 2023080709 April 2024
maintained.” Accordingly, for purposes of this analysis, Alternative 1 assumes that no new development would occur within the Project Site. As mentioned in Chapter 2, Project Description, of this Draft EIR, the Project Site is currently improved with an approximately 30,672 square foot, two-story office building built in the late 1970s. Under this alternative, the Project Site would continue to operate as an office building under existing conditions.
ES.4.2 Alternative 2: Existing Zoning Alternative
With development under the Existing Zoning Alternative (Alternative 2), the Project Site would be developed in accordance with the existing General Plan Land Use designation of Regional Center and existing zoning designation of Commercial Regional Business Park (CRB) for the Project Site.
It is acknowledged that the draft Land Use Element under consideration as part of Culver City’s General Plan 2045 Update includes a draft Land Use Map and Land Use designations with appropriate draft densities. The Project Site’s draft land use designation and density is Mixed-Use High and 100 dwelling units per acre, consistent with the City’s adopted 2021-2029 Housing Element preferred designation and density.
Under this Alternative, the existing 30,672 square foot two-story office building built in the 1970s would be replaced with a modern 190,000 square foot, 4-story (56 feet) office building. There would be 380 parking spaces for the office employees and guest parking. The amount and extent of excavation [approximately 51,400 cubic yards and 27 feet below ground surface (bgs)] required for subterranean parking would be generally similar to the Project. This Alternative would provide no retail uses or public open space as compared to the Project.
As with the Project, Alternative 2 would require the demolition of the existing office building and associated paved surface parking areas on the Project Site. Although demolition and excavation would be largely similar to the Project, with an approximate 47 percent reduction in overall building square footage (362,596 sf vs 190,000 sf) proposed under Alternative 2, the overall duration of the building construction phase would be reduced by approximately 50 percent from 17 months to 9 months. Thus, overall construction under Alternative 2 would be approximately 22 months, as opposed to 30 months under the Project.
ES.4.3 Alternative 3: Reduced Project Alternative
Under the Reduced Project Alternative ( Alternative 3) and similar to the Project, the Project Site would be redeveloped under the PD zone with an aesthetically succinct and unified development .
Alternative 3 contemplates a 28 percent reduction in residential units (density) by reducing the Project’s 309 units to 223 units. With this reduction, Alternative 3 would include a total of 222,000 sf of residential square footage, compared to the Project’s 356,996 square feet of residential space. Under Alternative 3, there would be no affordable units provided and as such, the Project’s Density Bonus incentives related to additional units and building height would not be applicable to Alternative 3.
Alternative 3 would include the same 5,600 square feet of retail floor space as the Project. The building height would be 5-stories (over 1-level of subterranean parking) or 56 feet. There would be 312 parking spaces between the 1st floor and P1 level compared to the Project’s 428 spaces. The Executive Summary
City of Culver City ES-5 5700 Hannum Avenue Mixed-Use Residential and Commercial Project SCH No. 2023080709 April 2024
reduced parking would eliminate one of the Project’s two subterranean parking levels, which would in turn reduce the amount of required soil excavation. Proposed vehicle circulation and loading area locations would be similar under the Project and Alternative 3. Publicly accessible open space on the ground level along Hannum would be reduced from 7,507 square feet under the Project to 2,500 square feet under Alternative 3. The retail space would be provided at the Project’s northeastern corner adjacent to the Hannum Boulevard/Buckingham Parkway intersection. Under Alternative 3, unlike the Project, no residential units would be provided at the Buckingham Parkway street level.
Instead there would be two levels of parking garage exposed along Buckingham Parkway.
As with the Project, Alternative 3 would require the demolition of the existing office building and associated paved surface parking areas on the Project Site. The amount and extent of excavation required for subterranean parking would be less than the Project. Under the Project there would be approximately 51,400 cubic yards of soil excavation reaching approximately 27 feet bgs. Although demolition and excavation would be largely similar to the Project, with an approximate 37 percent reduction in overall building square footage ( 362,593 sf vs 227,600 sf) and removal of one of the subterranean parking levels proposed under Alternative 3, the duration of the Project’s excavation phase would be reduced from 4 months to 2.5 months and the building construction phase would be reduced by approximately 1.5 months from 17 months to 15.5 months. Thus, overall construction under Alternative 3 would be approximately 27 months, as opposed to 30 months under the Project.
ES.4.4 Environmentally Superior Alternative
CEQA Guidelines Section 15126.6(e)(2) indicates that an analysis of alternatives to a proposed project shall identify an environmentally superior alternative among the alternatives evaluated in an EIR and that if the “no project” alternative is the environmentally superior alternative, the EIR shall identify another environmentally superior alternative among the remaining alternatives.
Selection of an environmentally superior alternative is based on comparison of the alternatives to determine which among the alternatives would reduce or eliminate the impacts associated with the Project to the greatest degree. The comparative impacts of the Project and the Project alternatives are summarized in Table 5-5, Comparison of the Impacts of the Project and Alternatives, in Chapter 5, Alternatives, of th e Draft EIR. . In addition, Table 5-6, Ability of Alternatives to Meet Project Objectives, is also provided in Chapter 5, Alternatives, of the Draft EIR to show a comparison of the ability of the analyzed alternatives t o meet Project Objectives .
Of the alternatives analyzed in this Draft EIR, Alternative 1, the No Project/No Build Alternative, would be considered the environmentally superior because it would not involve new development and assumes the on -site office use would continue to operate similar to existing conditions.
Alternative 1 would not meet any of the Project Objectives and would avoid all of the Project’s potentially significant impacts and would have less impacts compared to the Project. However, because Alternative 1 has been identified as the environmentally superior alternative, identification of another environmentally superior alternative is required.
Alternative 2, the Existing Zoning Alternative, and Alternative 3, the Reduced Project Alternative, would both involve less development compared to the Project, and both alternatives would reduce, but not eliminate, the Project’s significant unavoidable impacts related to Project-level on-site Executive Summary
City of Culver City ES-6 5700 Hannum Avenue Mixed-Use Residential and Commercial Project SCH No. 2023080709 April 2024
construction noise. As shown in Table 5-5, Alternative 2 would result in four (4) “greater” impacts [Operational regional emissions, Consumption of Energy Resources, GHG, and Transportation- Vehicle Miles Travelled (VMT)] for the issue areas analyzed compared to the Project, and 16 “less” impacts compared to the Project. Alternative 3 would result in two (2) “greater” impacts (Land Use and Transportation-VMT) for the issue areas analyzed compared to the Project, and 21 “less” impacts compared to the Project. Alternative 3 is considered the environmentally superior alternative, as it would reduce the magnitude of overall impacts compared to the Project to a greater extent than Alternative 2 since it would require less building construction and result in reduced residential occupancy at the Project Site.
However, because Alternative 3 would develop a smaller mixed-use development, the number housing units would be reduced and no affordable units would be provided. As such, Alternative 3 would not meet or meet to a lesser extent than the Project most of the Project Objectives related to:
providing housing, including affordable housing, in accordance with the City’s Regional Housing Needs goals; provision of publicly available open space; and promoting an active, landscaped pedestrian environment.
ES.5 Summary of Environmental Impacts
This section provides a summary of impacts, mitigation measures, and impacts after implementation of the mitigation measures associated with implementation of the Project. The summary is provided by environmental issue area below in Table ES -1, Summary of Project Impacts, Project Design Features and Mitigation Measures. Table ES-1 provides the impact statement for each issue area evaluated in Chapter 4, Environmental Impact Analysis. The summary also includes any Project Design Features (PDFs) and mitigation measures, as applicable.
Executive Summary
City of Culver City ES-7 5700 Hannum Avenue Mixed-Use Residential and Commercial Project SCH No. 2023080709 April 2024
TABLE ES-1
SUMMARY OF PROJECT IMPACTS, PROJECT DESIGN FEATURES, AND MITIGATION MEASURES Environmental Impact Project Design Features (PDF) Mitigation Measures (MM) Project Impact Determination
4.1 Aesthetics
REGULATIONS GOVERNING SCENIC QUALITY See Project Design Feature AES-PDF-1 (Screening of Utilities), below.
None required Less Than Significant
4.2 Air Quality
CONSISTENCY WITH APPLICABLE AIR QUALITY
PLAN
See Project Design Features GHG-PDF-1
(Green Building Features) and TRAF-
PDF-2 (TDM Program), below.
None required Less Than Significant
CUMULATIVELY CONSIDERABLE INCREASE OF CRITERIA POLLUTANTS IN NONATTAINMENT AREA Construction Not applicable None required Less Than Significant Operation Not applicable None required Less Than Significant
SENSITIVE RECEPTOR EXPOSURE TO POLLUTANT CONCENTRATIONS Construction Not applicable See Mitigation Measure AQ-1, below Less Than Significant with Mitigation (Project-level and
Cumulative)
Operation Not applicable None required Less Than Significant
4.3 Cultural Resources
ARCHAEOLOGICAL RESOURCES Not applicable See Mitigation Measures ARCH-1 through ARCH-3, below.
Less Than Significant with
Mitigation (Project-level and
Cumulative)
4.4 Energy
WASTEFUL, INEFFICIENT, AND UNNECESSARY
CONSUMPTION OF ENERGY RESOURCES
See Project Design Features GHG-PDF-1
(Green Building Features) and TRAF-
PDF-2 (TDM Program), below.
None required Less Than Significant
CONFLICT OR OBSTRUCT A STATE OR LOCAL
PLAN FOR RENEWABLE ENERGY OR ENERGY
EFFICIENCY
See Project Design Feature GHG-PDF-1
(Green Building Features), below.
None required Less Than Significant
4.5 Geology and Soils
PALEONTOLOGICAL RESOURCES Not applicable
See Mitigation Measures GEO-1 through
GEO-4, below.
Less Than Significant with
Mitigation (Project-level and
Cumulative)
Executive Summary
City of Culver City ES-8 5700 Hannum Avenue Mixed-Use Residential and Commercial Project SCH No. 2023080709 April 2024
TABLE ES-1
SUMMARY OF PROJECT IMPACTS, PROJECT DESIGN FEATURES, AND MITIGATION MEASURES Environmental Impact Project Design Features (PDF) Mitigation Measures (MM) Project Impact Determination
4.6 Greenhouse Gas Emissions
GHG EMISSIONS/ CONFLICT WITH ANY
APPLICABLE PLAN, POLICY OR REGULATION
ADOPTED FOR THE PURPOSE OF REDUCING THE
EMISSIONS OF GHGS
See Project Design Features GHG-PDF-1
(Green Building Features), and TRAF-
PDF-2 (TDM Program), below.
None required Less Than Significant
4.7 Land Use and Planning
CONFLICT WITH ANY APPLICABLE LAND USE
PLAN, POLICY, OR REGULATION ADOPTED FOR
THE PURPOSE OF AVOIDING OR MITIGATING AN
ENVIRONMENTAL EFFECT
See Project Design Features GHG-PDF-1
(Green Building Features and TRAF-PDF-
2 (TDM Program), below.
None required Less Than Significant
4.8 Noise
SUBSTANTIAL TEMPORARY OR PERMANENT INCREASE IN AMBIENT NOISE LEVELS Construction – On-Site See Project Design Features NOI-PDF-1 (Project Construction Schedule), NOI-
PDF-2 (Use of Impact Pile Driver), and
NOI-PDF-3 (Construction Rules Sign),
below.
See Mitigation Measures NOI-MM-1
(Sound Walls) and NOI-MM-2
9Construction Practices), below.
Significant and Unavoidable
Construction – Off-Site (Mobile Source) NOI-PDF-4 (Neighborhoods Streets), below.
None required Less Than Significant
Operation – On-Site See Project Design Features NOI-PDF-5 (Mechanical Equipment Noise), and NOI-
PDF-6 (Noise Control –Amplified Sound
Systems), below.
None required Less Than Significant
Operation – Off-Site Note Applicable. None required Less Than Significant
VIBRATION
Construction Not applicable None required Less Than Significant Operation Not applicable None required Less Than Significant
4.9 Population and Housing
INDUCE SUBSTANTIAL UNPLANNED POPULATION
GROWTH
Not applicable None required Less Than Significant
Executive Summary
City of Culver City ES-9 5700 Hannum Avenue Mixed-Use Residential and Commercial Project SCH No. 2023080709 April 2024
TABLE ES-1
SUMMARY OF PROJECT IMPACTS, PROJECT DESIGN FEATURES, AND MITIGATION MEASURES Environmental Impact Project Design Features (PDF) Mitigation Measures (MM) Project Impact Determination
4.10.1 Public Services – Fire Protection
FIRE PROTECTION
Construction See Project Design Feature TRAF-PDF-1
(Construction Management Plan), below.
None required Less Than Significant
Operation Not Applicable None required Less Than Significant
4.10.2 Public Services – Police Protection
POLICE PROTECTION
Construction See Project Design Features POL-PDF-1
(Project Site Security and Access During
Construction) and TRAF-PDF-1
(Construction Management Plan), below.
None required Less Than Significant
Operation See Project Design Feature POL-PDF-2
(Project Site Security and Access During
Operation), below.
None required Less Than Significant
4.10.3 Public Services – Schools
SCHOOLS Not applicable None required Less Than Significant
4.10.4 Public Services – Parks and Recreation
PARKS AND RECREATION
Construction Not applicable None required Less Than Significant Operation Not applicable None required Less Than Significant
4.11 Transportation
CONFLICT WITH A PROGRAM, PLAN, ORDINANCE
OR POLICY ADDRESSING THE CIRCULATION
SYSTEM, INCLUDING TRANSIT, ROADWAY,
BICYCLE AND PEDESTRIAN FACILITIES
See Project Design Feature TRAF-PDF-1
(Construction Management Plan), below.
None required Less Than Significant
CONFLICT OR BE INCONSISTENT WITH CEQA
GUIDELINES SECTION 15064.3, SUBDIVISION (B) -
VEHICLE MILES TRAVELED (VMT)
See Project Design Feature TRAF-PDF-2
(TDM Program), below.
None required Less Than Significant
GEOMETRIC HAZARDS Not applicable None required Less Than Significant EMERGENCY ACCESS See Project Design Feature TRAF-PDF-1
(Construction Management Plan), below.
None required Less Than Significant
Executive Summary
City of Culver City ES-10 5700 Hannum Avenue Mixed-Use Residential and Commercial Project SCH No. 2023080709 April 2024
TABLE ES-1
SUMMARY OF PROJECT IMPACTS, PROJECT DESIGN FEATURES, AND MITIGATION MEASURES Environmental Impact Project Design Features (PDF) Mitigation Measures (MM) Project Impact Determination
4.13 Tribal Cultural Resources
TRIBAL CULTURAL RESOURCES Not applicable See Mitigation Measures CUL-MM-2 and TCR-MM-1 through TCR-MM-3, below.
Less Than Significant with
Mitigation
4.13.1 Utilities and Service Systems – Water Supply
WATER INFRASTRUCTURE See Project Design Feature TRAF-PDF-1 (Construction Management Plan), below.
None required Less Than Significant
WATER SUPPLY See Project Design Feature WATER-
PDF-1 (Water Conservation), below.
None required Less Than Significant
4.13.2 Utilities and Service Systems – Electric Power, Natural Gas, and Telecommunications Facilities
ELECTRIC POWER, NATURAL GAS, AND
TELECOMMUNICATIONS INFRASTRUCTURE
Not applicable. None required Less Than Significant
SOURCE: ESA, 2024
Executive Summary
City of Culver City ES-11 5700 Hannum Avenue Mixed-Use Residential and Commercial Project SCH No. 2023080709 April 2024
ES.5.1 Project Design Features
Aesthetics
AES-PDF-1: Screening of Utilities. Mechanical, electrical, and roof top equipment (including Heating, Ventilation, and Air Conditioning [HVAC] systems), as well as building appurtenances (such as rooftop elevator stops), will be integrated into the Project’s architectural design (e.g., placed behind parapet walls) and will be screened from view from public rights-of-way.
Greenhouse Gas Emissions
GHG-PDF-1: Green Building Features. The Project will include the following green building features:
• The Project buildings will be designed to meet the United States Green Building Council (USGBC) Leadership in Energy and Environmental Design (LEED) Certified performance level or higher and will be designed and operated to meet or exceed the applicable requirements of the State of California Green Building Standards Code and Culver City’s Green Building Program Requirements.
• The Project will include installation of a solar photovoltaic system with 1 kW solar photovoltaic panels per 10,000 sf consistent with CCMC Chapter 15.02.1005 in order to achieve compliance with the City of Culver City’s solar photovoltaic requirement, per the City’s Green Building Ordinance and CALGreen standards.
• The Project will provide EV parking and charging for residential and commercial use. A total of 86 parking spaces (81 residential + 5 commercial) would be electric vehicle (EV) capable.
Forty-four (44) total spaces (41 residential + 3 commercial) would be EV ready. Forty -four (44) total spaces (41 residential + 3 commercial) would have EV charging stations. • The Project will include LED lighting throughout the Project Site and would install ENERGY STAR-rated appliances.
• The Project will incorporate efficient water management through low flow faucets and water - efficient landscape design with weather-based controllers and drip irrigation systems. • The Project will utilize only electricity and no natural gas in all land uses except for the retail space.
Noise
NOI-PDF-1: Project Construction Schedule. Prior to issuance of a building permit, notice of the Project construction schedule will be provided to adjacent property owners and occupants.
Evidence of such notification will be provided to the City of Culver City Public Works Department.
The notice will identify the commencement date and proposed timing for all construction phases (demolition, grading, excavation/shoring, foundation, rough frame, plumbing, roofing, mechanical and electrical, and exterior finish).
NOI-PDF-2: Use of Impact Pile Driver. The Project will not require or allow the use of impact pile drivers. Lower noise- and vibration-generating shoring piles to be drilled will be used.
Executive Summary
City of Culver City ES-12 5700 Hannum Avenue Mixed-Use Residential and Commercial Project SCH No. 2023080709 April 2024
NOI-PDF-3: Construction Rules Sign. During all phases of construction, a “Construction Rules Sign” that includes contact names and telephone numbers, with 24-hour availability, of the Applicant, Property Owner, construction contractor(s) will be posted on the Property in a location that is visible to the public. In addition, appropriate staff person at the City of Culver City will be notified for such incidences. These names and telephone numbers will also be made available to adjacent property owners and occupants to the satisfaction of the appropriate department (Planning Manager and/or Building Official) of Culver City.
NOI-PDF-4: Neighborhood Streets. No construction haul trucks, including concrete trucks, will be allowed to travel through neighborhood streets that are primarily residential uses.
NOI-PDF-5: Mechanical Equipment Noise . All building mechanical equipment and/or ventilation systems not fully enclosed will be designed to not exceed sound level limits of the noise level requirements of the City of Culver City General Plan Noise Element Regulation of Stationary Noise Sources through the use of quiet fans, duct silencers, parapets, or similar noise attenuation methods.
NOI-PDF-6: Noise Control – Amplified Sound Systems . If the Project installs permanent outdoor amplified sound systems, the systems will be located in discrete areas of the outdoor common opens space areas courtyard such that the sound would be mostly blocked by the proposed on-site building or walls from of f-site residential receivers. Section 9.07.055(B) of the CCMC prohibits the operation of a loud speaker or sound amplifying equipment for the purposes of transmitting messages, giving instructions or providing entertainment which is audible at a distance of fifty (50) feet or beyond the subject's property line without first filing an application and obtaining a permit as set forth in Chapter 9.07, Noise Regulations, of the CCMC. The systems will at a minimum be designed so as not to result in a perceivable increase at the nearest noise sensitive residential receptor. Specifically, daytime outdoor amplified sound systems will not result in an increase of 5 dBA L
eq over existing ambient noise conditions at the nearest noise sensitive residential receptor. Nighttime speaker noise, if it occurs, will comply with the exterior noise standards identified in the Regulation of Stationary Noise Sources (City of Culver City General Plan Noise Element, approved by City Council July 22, 1996) . A qualified noise consultant will provide written documentation and submitted to appropriate department of City of Culver City that the design of the system(s) complies with the maximum noise levels at the property line of the nearest off-site sensitive receivers.
Police Services
POL-PDF-1 (Project Site Security and Access During Construction): During construction of the Project, the Project Site will be fenced and gated with surveillance cameras to monitor the site during off hours.
POL-PDF-2 (Project Site Security and Access During Operation): During operation of the Project, access to the parking structure will be controlled through gated entries, and the entry areas will be well illuminated. Project Site security would include controlled keycard access to office spaces, security lighting within common areas and entryways, and closed-circuit TV monitoring (CCTV).
Executive Summary
City of Culver City ES-13 5700 Hannum Avenue Mixed-Use Residential and Commercial Project SCH No. 2023080709 April 2024
Transportation
TRAF-PDF-1: Construction Management Plan. A Final Construction Management Plan (FCMP) will be prepared by the Project contractor in consultation with the Project's traffic and/or civil engineer. The FCMP will define the scope and scheduling of construction activities covering the entire Project Site as well as the Applicant's proposed construction site management responsibilities in order to ensure that disturbance of nearby land uses or interruption of pedestrian, vehicle, bicycle and public transit are minimized to the extent feasible. The FCMP will be subject to review and approval by appropriate building officials, city traffic engineers, civil engineers, and planning manager for the City of Culver City, as required, prior to issuance of any Project demolition, grading or excavation permit. The FCMP will also be reviewed and approved by the respective fire and police departments.
Prior to commencement of construction, the contractor will advise the City’s public works inspector and building inspector (inspectors) of the construction schedule. As -needed construction management meetings shall be convened with appropriate Culver City staff and representatives of surrounding developments that may have overlapping construction schedules with the Project, to ensure that concurrent construction projects are managed in collaboration with one another. The FCMP will consider potential project construction disruptions to transportation facilities near the Project Site and provide effective strategies to limit the Project’s use of the public right-of -way (streets and sidewalks) during peak traffic periods and will be subject to adjustment by City staff as deemed necessary and appropriate to preserve the general public safety and welfare.
Prior to approval of the FCMP and grading permits, the Applicant will conduct one (1) community meeting pursuant to the notification requirements of the City of Culver City community meeting guidelines, to discuss and provide the following information to the surrounding community:
1. Construction schedule and hours.
2. Framework for construction phases.
3. Identify traffic diversion plan by phase and activity.
4. Potential location of construction parking and office trailers.
5. Truck hauling routes and material deliveries (i.e., identify the potential routes and restrictions.
Discuss the types and number of trucks anticipated and for what construction activity).
6. Emergency access plan.
7. Demolition plan.
8. Staging plan for the concrete pours, material loading and removal.
9. Crane location(s).
10. Accessible Applicant and contractor contacts during construction activity and during off hours (relevant email address and phone numbers).
11. Community notification procedures.
Executive Summary
City of Culver City ES-14 5700 Hannum Avenue Mixed-Use Residential and Commercial Project SCH No. 2023080709 April 2024
The FCMP will at a minimum include the following:
1. The name and telephone number of a contact person who can be reached 24 hours a day via telephone regarding construction or construction traffic complaints or emergency situations.
2. An up-to-date list of local police, fire, and emergency response organizations and procedures for the coordination of construction activity, potential delays, and any alerts related to unanticipated road conditions or delays, with local police, fire, and emergency response agencies. Maps showing access to and within the site and to adjacent properties will be provided.
3. Construction plans and procedures to address community concerns the City of Culver City personnel notification of key construction activities; temporary construction fencing and maintenance of construction areas within public view; noise and vibration controls; dust management and control; and worker education on required mitigation measures included in the Project’s Mitigation Monitoring Program and best practices to reduce disturbances to adjacent and nearby land uses.
4. Procedures for the training and certification of flag persons.
5. To the extent known, identification of the location, times, and estimated duration of any roadway closures; procedures for traffic detours, pedestrian protection, reducing effects on public transit and alternate transportation modes; and plans for use of protective devices, warning signs, and staging or queuing areas.
6. The location of temporary power, portable toilet and trash and materials storage locations.
7. The timing and duration of any street, sidewalk and/or lane closures will be approved in advance by ethe City of Culver City. As traffic lane, parking lane, and/or sidewalk closures are anticipated, worksite traffic control plan(s), approved by the City of Culver City, will be developed and implemented to route vehicular traffic, bicyclists, and pedestrians around any such closures. As applicable at the time of construction, such notices will be made available in digital format for posting on each City w ebsite and distribution via email alerts on electronic platforms such as the County of Los Angeles’ "Gov Delivery" system. The FCMP will be updated weekly during the duration of project construction, as determined necessary by the City. The FCMP will require that review and approval of any proposed lane closures include coordination with the Culver City Fire and Police Departments to minimize potential effects on traffic flow and emergency response.
8. Provisions that staging of construction equipment and materials will be accommodated within the Project Site and that construction worker parking will be accommodated on the Project Site and/or at off-site locations to be determined and disclosed, potentially with shuttles to and from the Project Site.
TRAF-PDF-2: Transportation Demand Management (TDM) Program. The Project will implement TDM measures that include, but are not limited to, those listed below subject to Culver City Transportation Department review and approval prior to issuance of the first Temporary Certificate of Occupancy (TCO) for the Project in order to reduce drive-alone vehicle trips to/from the Project Site by residents, visitors and employees, as well peak hour traffic. The TDM strategies necessary comply with the TDM and trip reduction requirements of City Municipal Code Section
07.05.015, as well as City’s design requirements for the Project:
Executive Summary
City of Culver City ES-15 5700 Hannum Avenue Mixed-Use Residential and Commercial Project SCH No. 2023080709 April 2024
On-Site Enhancements - The Project design will incorporate mobility features to encourage alternative transportation modes. The features will be designed in accordance with the City Municipal Code requirements and standards.
• Pedestrian Connections. The Project will p rovide exclusive pedestrian access separate from vehicular driveways. The Project will provide internal walkways that connect the pedestrian access points to off-site pedestrian facilities, rideshare, and transit. • Bicycle Parking and Amenities. The Project wil l provide both short-term and long-term bicycle parking spaces on-site in accordance with the City Municipal Code requirements. Short -term bicycle parking, which will include bicycle racks, will be located near the pedestrian entrance.
Long-term bicycle parking, which will include bicycle lockers or secure bicycle enclosures, will be placed in an accessible weather protected location.
Electric Vehicle (EV) Parking. In
accordance with City Municipal Code Section 17.320.035.O.3, at least 40% of the onsite parking supply wi ll have EV capability, including EV Capable spaces (20%), EV Ready spaces (10%), and Full EV Charger/Charging Stations (10%).
Off-Site Enhancements - T he Project will improve and contribute toward improvements to off - site mobility facilities to encourage alternative transportation modes. • Mobility Fees. I n accordance with City Municipal Code Section 05.06.015, the Project will be subject to contributing its fair share toward funding the City's mobility infrastructure and improvement projects intended to reduce VMT and support housing and job growth. Pursuant to Resolution No. 2021-R055, the total mobility fee for the Project will be based on a rate of $3,394 per multi-family unit and $14.92 per sf of commercial space.
Other TDM Strategies - T
he Project will implement TDM strategies to reduce peak hour vehicular traffic and air emissions to and from the Project Site. The following details the minimum TDM strategies necessary to comply with the TDM and trip reduction requirements of City Mun icipal Code Section 07.05.015, as well as City’s design requirements for the Project:
• Transportation Information Center (TIC). The Project will provide a TIC, a commuter information center where residents, employees, and visitors can obtain information regarding commute programs and individuals can obtain real -time information for planning travel without using an automobile. A TIC provides information about transit schedules, commute planning, rideshare, telecommuting, bicycle routes and facilities, and facilities and resources for carpoolers, vanpoolers, bicyclists, transit riders, and pedestrians. The TIC can be provided via a bulletin board, display case, or kiosk, as well as virtually, providing every resident, employee, and visitor access to commuter information through a website portal. • Bicycle Parking and Amenities. The Project will support bicycling to work through the provision of bike storage facilities throughout the Project site. Bicycle parking will be provided in accordance with the City Municipal Code requirements for the Project and will include short- term facilities (e.g., bicycle racks) and secure long-term bicycle parking (e.g., fully enclosed rooms or bicycle lockers that protect the bicycle from inclement weather and accessible only to the owner).
• Pedestrian-Friendly Environment . The Project is designed to be pedestrian -friendly and accessible to the local neighborhood. The Project’s pedestrian access points will be located separate from vehicular access points. To promote walkability within and around the Project Executive Summary
City of Culver City ES-16 5700 Hannum Avenue Mixed-Use Residential and Commercial Project SCH No. 2023080709 April 2024
site, internal pedestrian pathways will provide a safe and direct connection to external public pedestrian facilities. Safety measures will also be implemented at the Project driveway to ensure safe crossings to limit potential vehicular-pedestrian conflicts. • E mployee Parking. At least 10% of employee parking will be reserved, as signed on the spaces, for use by potential carpool or vanpool vehicles and located as close as practical to employee entrances. This preferential parking will be identified on the site plan accompanyi ng the application for a building permit. Vanpool spaces will have a minimum parking space dimension of nine feet wide by 18 feet in length and provide a minimum interior vertical clearance of eight feet two inches. A safe and convenient zo ne in which vanpool and carpool vehicles may deliver or board their passengers will also be provided. • Bus Stop Improvements. If deemed necessary by the City, bus stop improvements will be provided to the satisfaction of the City Director of Transportation.
Plan/Program Management - T he Project will take appropriate measures to help future residents and employees manage each TM Plan element and maximize program participation through consolidation of information and proactive engagement. The following will be provided as part of the TDM Plan:
• Project Transportation Coordinator. A Transportation Coordinator will be designated for the site and will be responsible for implementing, coordinating, and maintaining the elements of the TDM Plan. The identity and contact information for the Transportation Coordinator will be supplied to the City and kept current.
• Transportation Information Packet for New Residents and Employees .
Each new resident and
employee will receive an information packet summarizing the transit and transportation alternatives available to Project tenants. The packet will emphasize the location of the TIC and include the contact information of the Transportation Coordinator.
Mobility Hub Support and Alternative Transportation - Th e Project will incorporate measures
and design elements to support first -mile/last-mile service connection for transit users and reduce reliance on personal automobiles. The following will be provided as part of the TDM Plan:
• Bike Repair Station. The Project will provide an on-si te bike parking station for use by Project residents and employees that has a space and basic tool set for bike repairs. • Subsidized Shared- Ride/Uber/Lift Service. Employees who arrive to work via a means other than a single -passenger vehicle or utilize the carpool matching service will automatically be registered in a Subsidized Shared -Ride/Uber/Lift Service by which, upon request to the Transportation Coordinator, the employee will be given a voucher to travel home or Uber/Lyft (or similar shared ride service) in case of illness or emergency. The Project will provide up to $750 in total for this program every year. The subsidy will be for two years after Certificate of Occupancy over a two-year period.
• Transit Passes. The Project will provide up to $500 per pass per year of subsidies for up to five Transit Access Passes (TAP) cards for a period of three years for employees who opt to take Metro instead of personal vehicles and will not be provided on-site parking acco mmodations and not receive a car share subsidy.
Executive Summary
City of Culver City ES-17 5700 Hannum Avenue Mixed-Use Residential and Commercial Project SCH No. 2023080709 April 2024
Utilities and Service Systems – Water Supply
WATER-PDF-1: Water Conservation. The Project will implement water conservation measures that include, but are not limited to, the following:
• Landscape and Irrigation
– California Friendly® plants or native plants
– Drip/ Subsurface Irrigation (Micro-Irrigation)
– Proper Hydro-zoning/Zoned Irrigation (groups plants with similar water requirements together) ES.5.2 Mitigation Measures
Air Quality
AQ-1: Construction Equipment. The Applicant shall implement the following requirements for construction equipment operating at each Project site. These requirements shall be included in applicable bid documents and contractor(s) must demonstrate the ability to supply such equipment.
Construction equipment shall include the following:
• The Project shall utilize off-road diesel-powered construction equipment that meets or exceeds the California Air Resources Board (CARB) and United States Environmental Protection Agency (USEPA) Tier 4 Final off-road emissions standards or equivalent for equipment rated at 25 horsepower (hp) or greater during Project construction where available within the Air Basin. Such equipment shall be outfitted with Best Available Control Technology (BACT) which means a CARB certified Level 3 Diesel Particulate Filter or equivalent. A copy of each unit’s certified tier specification, BACT documentation, and CARB or Southern California Air Quality Management District (SCAQMD) operating permit at the time of mobilization of each applicable unit of equipment shall be provided.
• Use electrified tower cranes in place of diesel-fueled equipment.
Cultural Resources
ARCH-1: Prior to the issuance of a demolition permit, the Applicant shall retain an archaeologist who meets the Secretary of the Interior’s Professional Qualifications Standards for Archaeology (Qualified Archaeologist) to oversee an archaeological monitor who shall be present during initial Project construction work such as site demolition (e.g., building footings/foundations, subsurface utilities, surface parking lots, sidewalks, etc.), clearing/grubbing, grading, trenching, or related moving of soils wit hin the Project Site (collectively, ground disturbing activities); provided, however, that ground disturbing activities shall not include any moving of soils after they have been initially disturbed or displaced by Project -related construction. The Qualified Archaeologist shall determine the frequency of monitoring based on the rate of excavation and grading activities, proximity to known archaeological resources, the materials being excavated (younger alluvium vs. older alluvium), and the depth of excavation, and if found, the abundance and type of archaeological resources encountered. The frequency of monitoring can be reduced to part -time inspections or ceased entirely if determined appropriate by the Qualified Archaeologist.
Prior to commencement of excavation activities, an Archaeological and Cultural Resources Sensitivity Training shall be given for construction personnel. The training session shall be carried Executive Summary
City of Culver City ES-18 5700 Hannum Avenue Mixed-Use Residential and Commercial Project SCH No. 2023080709 April 2024
out by the Qualified Archaeologist and shall focus on how to identify archaeological resources that may be encountered during earthmoving activities and the procedures to be followed in such an event.
ARCH-2: In the event that historic or prehistoric archaeological resources (e.g., bottles, foundations, refuse dumps, etc.) are unearthed, ground-disturbing activities shall be halted or diverted away from the vicinity of the find so that the find can be evaluated. After consulting with the Applicant, the Qualified Archeologist shall establish an appropriate buffer area in accordance with industry standards, reasonable assumptions regarding the potential for additional discoveries in the vicinity, and safety considerations for those making an evaluation and potential recovery of the discovery. This buffer area shall be established around the find where construction activities shall not be allowed to continue. Work within the buffer area shall only be allowed to continue after the evaluation and recovery efforts are completed. Work shall be allowed to continue outside of the buffer area.
All archaeological resources unearthed by Project construction activities shall be evaluated by the Qualified Archaeologist. If the Qualified Archaeologist determines the find to constitute a “historical resource” pursuant to CEQA Guidelines Section 15064.5(a) or a “unique archaeological resource” pursuant to Public Resources Code Section 21083.2(g), the Qualified Archaeologist shall coordinate with the Applicant and the City of Culver City (City) to develop a formal treatment plan that would serve to reduce impacts to the resources and that provides for or the adequate recovery of the scientifically consequential information contained in the resources along with subsequent laboratory processing, analysis, evaluation, and reporting. The treatment plan establ ished for the resources shall be in accordance with CEQA Guidelines Section 15064.5(f) for historical resources and Public Resources Code Sections 21083.2(b) for unique archaeological resources. The treatment plan shall include measures regarding the curation of the recovered resources that may include curation at a public, non-profit institution with a research interest in the materials, such as the Natural History Museum of Los Angeles County or the Fowler Museum, if such an institution agrees to accept the material. If no institution accepts the resources, they may be donated to a local school or historical society in the area (such as the Culver City Historical Society) for educational purposes.
ARCH-3: The Qualified Archaeologist shall prepare a final report and appropriate California Department of Parks and Recreation Site Forms at the conclusion of archaeological monitoring.
The report shall include a description of resources unearthed, if any, treatment of the resources, results of the artifact processing, analysis, and research, and evaluation of the resources with respect to the California Register of Historical Resources and CEQA. The report and the Site Forms shall be submitted by the Applicant to the City, the South Central Coastal Information Center, and representatives of other appropriate or concerned agencies to signify the satisfactory completion of the Project and required mitigation measures.
Geology and Soils
GEO-1: Prior to the issuance of grading permits, the Applicant shall retain a Qualified Paleontologist meeting the Society of Vertebrate Paleontology (SVP) Standards. The Qualified Paleontologist shall provide technical and compliance oversight of all work as i t relates to paleontological resources, shall attend the Project kick-off meeting, and shall be responsible for Executive Summary
City of Culver City ES-19 5700 Hannum Avenue Mixed-Use Residential and Commercial Project SCH No. 2023080709 April 2024
monitoring and overseeing paleontological monitors (meeting SVP standards) that will observe grading and excavation activities.
GEO-2: Paleontological monitoring shall be conducted during construction excavations into undisturbed older alluvial sediments and undisturbed Baldwin Hills Paleosol. Monitoring shall consist of visually inspecting fresh exposures of rock for larger fossil rema ins and, where appropriate, collecting and wet screening sediment samples of promising horizons for smaller fossil remains. If significant vertebrate fossils are found by screening, it will be necessary to collect a 6,000-pound sample for screening from each producing geologic unit, per SVP Guidelines (2010).
The sample(s) can be collected by construction machinery and stockpiled and processed in a safe location on site, or transported to another site for processing. The frequency of monitoring inspections shall be determined by the Qualified Paleontologist and shall be based on the rate of excavation and grading activities, the materials being excavated, and the depth of excavation, and if found, the abundance and type of fossils encountered. Full -time monitoring can be reduced to part-time inspections, or ceased entirely, if determined adequate by the Qualified Paleontologist. If a potential fossil is found, the Qualified Paleontologist and the monitor shall have authority to temporarily stop excavatio n activity or to temporarily divert or redirect grading and excavation activities in the area of the exposed fossil to facilitate evaluation of the discovery. An appropriate buffer area shall be established by the Qualified Paleontologist around the find where construction activities shall not be allowed to continue. Work shall be allowed to continue outside of the buffer area. At the Qualified Paleontologist’s discretion, and to reduce any construction delay, the grading and excavation contractor shall assist in removing rock/sediment samples for initial processing and evaluation. If preservation in place is not feasible, the Qualified Paleontologist shall implement a paleontological salvage program to remove the resources from their location.
GEO-3: If the older Quaternary alluvium produces any mollusk fossils, a specimen shall be submitted for radiocarbon dating. If the Fox Hills Paleosol produces any pedogenic calcium carbonate, a sample shall be submitted for radiocarbon dating.
GEO-4: Any significant fossils recovered during Project -related excavations shall be prepared to the point of identification. The residue form sediment samples shall be dried and sorted with a binocular dissecting microscope. Both macrofossils and vertebrate microfossils shall be prepared to the point of identification, identified, and curated into an accredited repository. The Qualified Paleontologist shall prepare a final report summarizing the results of the monitoring and salvaging efforts, the methodology used in these efforts, as well as a description of the fossils collected and their significance. The report shall accompany the specimens to the accredited repository. The report shall also be submitted by the Applicant to the City of Culver City to signify the satisfactory completion of the Project and required mitigation measures.
Noise
MM-NOI-1: Temporary noise barriers shall be installed along the southern and eastern Project boundary to shield the sensitive receptors from construction noise. The barrier shall have a minimum height of 6 to 15 feet (from south to north, with the top of the barrier at least 15 feet above the ground surface of the residences to the east along Buckingham Parkway) that is made of Executive Summary
City of Culver City ES-20 5700 Hannum Avenue Mixed-Use Residential and Commercial Project SCH No. 2023080709 April 2024
sound blanket, plywood or other solid material capable of reducing on-site construction noise levels by 17 to 19 dBA.
MM-NOI-2: Since construction equipment operates intermittently, and the types of equipment change with the stage of construction, noise emitted during construction would be mobile and highly variable. The following features shall be implemented during Project construction to reduce noise levels:
• Maintain all construction tools and equipment in good operating order according to manufacturers’ specifications.
• To the extent practicable, schedule construction activity during normal working hours between 8 a.m. and 5 p.m. on weekdays when higher sound levels are typically present and are found acceptable.
• Equip internal combustion engines with properly operating mufflers that are free from rust, holes, and leaks.
• For construction equipment that utilize internal combustion engines, ensure the engine’s housing doors are kept closed, and install noise -insulating material mounted on the engine housing consistent with manufacturers’ guidelines, if possible.
Tribal Cultural Resources
TCR-MM-1: Prior to the issuance of a demolition permit for the Project, the Applicant shall retain a Native American Monitor from the Gabrieliño Band of Mission Indians – Kizh Nation (Kizh Nation or Tribe). The Native American Monitor shall be present during the following construction activities that have the potential for encountering tribal cultural resources: demolition, pavement removal, clearing/grubbing, drilling/augering, potholing, grading, trenching, excavation, tree removal or other ground disturbing activity associated with the Project, whether on the Project Site or in connection with Project off -site improvements (collectively “ground disturbing activities”).
Notwithstanding the foregoing, Native American monitoring shall not be required for any moving of soils that have been monitored or observed prior to their disturbance and subsequently disturbed or displaced by Project-related construction. The Applicant shall prepare a monitoring agreement with the Kizh Nation that outlines the roles and responsibilities of the Native American Monitor and shall submit this agreement to the City of Culver City (City) prior to the issuance of demolition permit for the Project.
Prior to commencement ground disturbing activities, a Tribal Cultural Resources Sensitivity Training session shall be held for those construction personnel who will be directly involved in the ground disturbing activities. The training session shall be car ried out by the Native American Monitor and shall focus on how to identify tribal cultural resources that may be encountered during ground disturbing activities and the procedures to be followed in such an event. If the Native American Monitor is not present at the Project Site on any given workday, the ground disturbing activities may continue if the workers involved in such activities attended the training session.
Full-time monitoring may be reduced to part -time inspections, or ceased entirely, if determined appropriate by the Native American Monitor in the event there appears to be little to no potential Executive Summary
City of Culver City ES-21 5700 Hannum Avenue Mixed-Use Residential and Commercial Project SCH No. 2023080709 April 2024
for impacting tribal cultural resources. Native American monitoring shall conclude no later than conclusion of ground disturbing activities.
TCR-MM-2: The Native American Monitor shall complete daily monitoring logs that provide descriptions of the relevant ground-disturbing activities, the type of construction activities performed, locations of ground-disturbing activities, soil types, cultural-related materials, and any other facts, conditions, materials, or discoveries of significance to the Tribe. Monitor logs shall identify and describe any discovered tribal cultural resources, including but not limited to, Native American cultural and historical artifacts, remains, places of significance, etc., as well as any discovered Native American (ancestral) human remains and burial goods. Copies of monitor logs shall be provided to the Applicant and the City upon written request to the Tribe. The Applicant shall not be deemed to be out of compliance with this measure if the Native American Monitor fails to complete or submit any such monitoring logs.
TCR-MM-3: In the event of a discovery of potential tribal cultural resources at the Project Site, the Qualified Archaeologist identified in Mitigation Measure CUL-MM-1 (after consultation with the Native American Monitor) shall have the authority to temporarily divert, redirect, or halt ground-disturbance activities to allow identification, evaluation, and potential recovery of such potential resources. After consulting with the Native American Monitor and the Applicant, the Qualified Archaeologist shall establish an appropriate buffer area in accordance with industry standards, reasonable assumptions regarding the potential for additional discoveries in the vicinity, and safety considerations for those making an evaluation and potential recovery of the disc overy.
This buffer area shall be established around the find where ground-disturbing activities shall not be allowed to continue. Work shall be allowed to continue outside of the buffer area.
Within three (3) business days of such discovery, a meeting shall take place between the Applicant, the Qualified Archaeologist, the Tribe, and the City to discuss the significance of the find and whether it qualifies as a tribal cultural resource pursuant to Public Resources Code Section 21074(a). If, as a result of the meeting and after consultation with the Tribe, the Applicant, and the Qualified Archaeologist, the City determines, based on substantial evidence, that the resource is in fact a tribal cultural resource, the Qualified Archaeologist shall develop a reasonable and feasible treatment plan, with input from the Tribe as necessary, and with the concurrence of the City’s Planning Director. The treatment measures in the treatment plan shall be in compliance with any applicable federal, State, or local laws, rules or regulations. The treatment plan shall also include measures regarding the curation of the recovered resources.
If the Applicant does not accept a particular recommendation determined to be reasonable and feasible by the Qualified Archaeologist (including, but not limited to, the size of the buffer set forth above), the Applicant, or its successor, may request mediation by a mediator agreed to by the Applicant and the City. The mediator must have the requisite professional qualifications and experience to mediate such a dispute. The City shall make the determination as to whether the mediator is at least minimally qualified to mediate the dispute. After making a reasonable effort to mediate this particular dispute, the City may: (1) require the recommendation be implemented as originally proposed by the Archaeologist; (2) require the recommendation, as modified by the City, be implemented as it is at least as equally effective to mitigate a potentially significant impact; (3) Executive Summary
City of Culver City ES-22 5700 Hannum Avenue Mixed-Use Residential and Commercial Project SCH No. 2023080709 April 2024
require a substitute recommendation be implemented that is at least as equally effective to mitigate a potentially significant impact to a tribal cultural resource; or (4) not require the recommendation be implemented because it is not necessary to mitigat e any significant impacts to tribal cultural resources. The Applicant shall pay all costs and fees associated with the mediator.
The Applicant may recommence ground disturbance activities inside of the specified radius of the discovery site only after it has complied with all of the recommendations developed and approved pursuant to the process set forth in the above paragraphs.
The recovered Native American resources may be placed in the custody of the Tribe, who may choose to use them for their educational purposes or they may be curated at a public, non- profit institution with a research interest in the materials. If neither the Tribe nor an institution accepts the resources, they may be donated to a local school or historical society in the area for educational purposes.
Notwithstanding the above paragraph, any information determined to be confidential in nature by the City Attorney’s office, shall be excluded from submission to the SCCIC or the general public under the applicable provisions of the California Public Records Act, California Public Resources Code Section 6254(r).
City of Culver City 1-1 5700 Hannum Avenue Mixed-Use Residential and Commercial Project SCH No. 2023080709 April 2024
CHAPTER 1
Introduction
This Draft Environmental Impact Report (EIR) has been prepared for t he 5700 Hannum Project (Project). 5700 Hannum Owner, LLC c/o Lincoln Property Company, the Applicant, proposes to develop a mixed-use residential and commercial project on an approximately 2.23-acre ( 97,264 square feet [sf]) s ite (Project Site) located at 5700 Hannum Avenue within the Fox Hills neighborhood of the City of Culver City (City). The Project Site is currently developed with an existing two-story office building in the northern portion of the Project Site and associated surface parking. The Project would develop a mixed-use building consisting of a new 6-story (up to a height 78-feet) structure above two (2) semi subterranean levels; 309 residential units (including 27 Very Low-Income units) and 5,600 square feet of ground floor retail space. The Project would provide 7,507 square feet of publicly accessible open space, 19,526 square feet of private open space, and 27,123 square feet of common open space (for residents) for a total of 54,156 square feet of open space. The Project would include a total of 428 vehicular parking spaces (399 residential, six (6) guest and 23 commercial) within three parking levels. Two points of vehicular access would be provided to the Project Site, including a residential only driveway along Buckingham Parkway and a commercial and residential driveway along Hannum Avenue. The Project would also provide a total of 92 bicycle spaces, consisting of 11 short -term and 81 long-term bicycle parking spaces in compliance with Culver City Municipal Code (CCMC) requirements . The Project is proposing to change the Project Site’s zoning designation to Planned Development (PD) with adoption of a Comprehensive Plan that would serve as the overarching entitlement mechanism for the Project Site. To achieve the Project’s proposed density and mix of uses, a General Plan Amendment Map would be needed to designate the Project Site as General Corridor.
1.1 P urpose of the Draft EIR
The purpose of this Draft EIR is to inform decision-makers and the general public of the potential environmental impacts resulting from the Project. The City is the Lead Agency under the California Environmental Quality Act (CEQA) responsible for preparing this Draft EIR. This Draft EIR has been prepared in conformance with CEQA (California Public Resources Code [PRC] Section 21000 et seq.), and the CEQA Guidelines (California Code of Regulations [CCR], Title 14, Section 15000 et seq.). The principal CEQA G uidelines sections governing content of this document are Sections 15120 through 15132 (Contents of an EIR), and Section 15161 (Project EIR).
The City is responsible for processing and approving the Project pursuant to CEQA Statute Section 21067. The City will consider the information in this Draft EIR, along with other information that may be presented during the CEQA process, including but not limited to the Initial Study and a Final EIR. The EIR will be used in connection with other permits and approvals necessary for the
1. Introduction
City of Culver City 1-2 5700 Hannum Avenue Mixed-Use Residential and Commercial Project SCH No. 2023080709 April 2024
construction and operation of the Project. The EIR will be used by the City ’s Current Planning Division, Building Safety Division, Public Works Department, and any other responsible public agencies that must approve activities undertaken with respect to the Project.
In accordance with CEQA Guidelines Section 15121, this Draft EIR is an informational document that will inform public agency decision -makers and the public generally of the environmental effects associated with the Project, and ways to minimize significant environmental effects through mitigation measures or reasonable alternatives to the Project. For some effects, significant environmental impacts cannot be mitigated to a level considered less than significant; in such cases, impacts are considered significant and unavoidable. In accordance with CEQA Guidelines Section 15093(b), if a public agency approves a project that has significant impacts that are not substantially mitigated (i.e., significant unavoidable impacts where impacts cannot be mitigated to less than significant levels), the agency must state in writing the specific reasons for approving the project, based on the Final EIR and any other information in the public record for the project. This is known as a “statement of overriding considerations.”
This Draft EIR analyzes the environmental effects of the Project to the degree of specificity appropriate to the activities proposed by the Project, as required under CEQA Guidelines Section 15146. This analysis considers the activities associated with the Project, to determine the short - term and long-term effects associated with their implementation. This Draft EIR discusses both the direct and indirect impacts of this Project, as well as the cumulative impacts associated with other past, present, and reasonably foreseeable future projects in the vicinity . CEQA requires the preparation of an objective, full disclosure document to inform agency decision -makers and the general public of the direct and indirect environmental effects of the proposed Project, including mitigation measures and reasonable alternatives that can reduce or eliminate any identified significant adverse impacts.
1.2 EIR Scoping Process
In compliance with the State CEQA Guidelines, the City has taken steps to provide opportunities to participate in the environmental review process. In association with preparation of the Draft EIR, efforts were made to contact various State, regional, and local government agencies and other interested parties to solicit comments and inform the public of the Project. As further described below, this included the distribution of an Initial Study and Notice of Preparation (NOP) of an Environmental Impact Report and EIR Scoping Meeting.
1.2.1 Initial Study
In accordance with CEQA Guidelines Section 15063(a), the City prepared an Initial Study to identify potential environmental impacts. The Initial Study determined that the Project had the potential to result in significant impacts associated with a number of environmental issues. As a result, the Initial Study led to a determination that a Draft EIR should be prepared to address those issues where the Project could result in significant environmental impacts, and to consider feasible mitigation measures and alternatives to the Project.
1. Introduction
City of Culver City 1-3 5700 Hannum Avenue Mixed-Use Residential and Commercial Project SCH No. 2023080709 April 2024
The Draft EIR focuses primarily on changes in the environment that would result from the Project, individually and cumulatively with other development projects. The Draft EIR identifies potentially significant direct and indirect impacts resulting from construction and operation of the Project and provides mitigation measures to reduce or avoid such effects. Based on public input and the results of the Initial Study, this Draft EIR addresses environmental effects in the following areas:
• Aesthetics
• Air Quality
• Cultural Resources
– Archaeological Resources only
• Energy
• Geology and Soils
– Paleontological Resources only
• Greenhouse Gas Emissions
• Land Use and Planning
• Noise
• Population and Housing
• Public Services
– Fire Protection
– Police Protection
– Schools
– Parks
• Transportation
• Tribal Cultural Resources
• Utilities and Service Systems
Based on the Initial Study, issues for which no significant impacts are anticipated to occur are discussed briefly as a part of Chapter 6, Other CEQA Considerations, of this Draft EIR. The analyses supporting these determinations are provided in the Initial Study included as Appendix A-2 of this Draft EIR.
1.2.2 Notice of Preparation
Pursuant to the provision of CEQA Guidelines Section 15082, the City circulated a Notice of Preparation of an Environmental Impact Report and Community Meeting/EIR Scoping Meeting (NOP) to State, regional, and local agencies, and members of the public for a 30-day review period commencing August 29, 2023 and ending September 29, 2023. The purpose of the NOP was to formally notice that the City was preparing a Draft EIR for the Project, and to solicit input regarding the scope and content of the environmental information to be included in the Draft EIR. See Appendix A-1 of this Draft EIR for a copy of the NOP.
1. Introduction
City of Culver City 1-4 5700 Hannum Avenue Mixed-Use Residential and Commercial Project SCH No. 2023080709 April 2024
1.2.3 EIR Scoping Meeting/Community Meeting
The NOP included notification that a virtual Community Meeting and an EIR Scoping Meeting would be held. Consistent with City policy, but independent of the CEQA process, the purpose of the Community Meeting was for the Applicant to present the Project, solicit community comments, and receive feedback in association with the entitlement applications submitted to the City. In accordance with the CEQA Guidelines, the purpose of the EIR Scoping Meeting was for the City to solicit input and written comments from agencies and the public on environmental issues or alternatives they believe should be addressed in the Draft EIR. The virtual Community Meeting and EIR Scoping Meeting was held on September 12, 2023, at 7:00 P.M. The EIR Scoping Meeting was held in an online format using zoom and provided interested individuals, groups, and public agencies the opportunity to view materials and ask questions regarding the scope and focus of the Draft EIR as described in the NOP and Initial Study. The presentation materials from the EIR Scoping Meeting are provided in Appendix A-3 of this Draft EIR.
1.2.4 Comments Received
During the public review period for the NOP, 10 commenters submitted responses to the NOP .
Correspondence was received from the California Air Resources Board’s (CARB), California Department of Transportation (Caltrans), County of Los Angeles Department of Public Works, the Native American Heritage Commission (NAHC), interested organizations, and interested parties.
All written comments are provided in Appendix A -4, of this Draft EIR and summarized in the Executive Summary.
1.3 Format of the Draft EIR
The Draft EIR includes an Executive Summary, nine chapters, and appendices, which are organized as follows:
Executive Summary. This chapter of the Draft EIR provides an overview of the entire document in a concise, summarized format. It briefly describes the Project (location and key Project features), the CEQA review process and focus, identifies effects found to be significant and unavoidable, identifies areas of controversy, provides a summary of the Project alternatives (descriptions and conclusions regarding comparative impacts), and provides a summary of Project impacts, Project Design Features and mitigation measures, and the level of impact significance following implementation of mitigation measures.
1. Introduction. This chapter provides a summary of the Project, describes the purpose of the EIR, including CEQA compliance requirements, steps undertaken to date regarding implementation of the CEQA process, and also summarizes the Draft EIR’s organization.
2. Project Description. This chapter describes the location, background and existing conditions, Project objectives, physical and operational characteristics of the Project , and requested entitlements.
1. Introduction
City of Culver City 1-5 5700 Hannum Avenue Mixed-Use Residential and Commercial Project SCH No. 2023080709 April 2024
3. Environmental Setting. This chapter presents an overview of the Project’s environmental setting, including on-site and surrounding land uses. This section also provides a list and the mapped locations of past, present, and probable future related projects considered in the analysis of potential Project contributions to cumulative impacts.
4. Environmental Impact Analysis. This chapter contains the environmental setting, regulatory framework, methodology, thresholds to determine level of significance, Project Characteristics and/or Project Design Features, Project-specific and cumulative impact analyses, mitigation measures, and conclusions regarding the level of significance after mitigation for each of the following environmental issues: 1) Aesthetics; 2 ) Air Quality; 3 ) Cultural Resources – Archaeological Resources; 4) Energy; 5) Geology and Soils – Paleontological Resources; 6) Greenhouse Gas Emissions; 7) Land Use and Planning; 8) Noise; 9) Population and Housing; 10) Public Services – Fire Protection, Polic e Protection , Schools, Recreation ; 11) Transportation; 12) Tribal Cultural Resources; and 13) Utilities and Service Systems.
5. Alternatives. This chapter describes a reasonable range of alternatives to the Project, including the (1) No Project/No Build Alternative, (2) Existing Zoning/Office Alternative; and (3) Reduced Density Alternative. This chapter also evaluates the environmental effects of the alternatives for each issue area analyzed in the Draft EIR, though not at the same level of detail as analyzed for the Project.
6. Other CEQA Considerations. This chapter includes a discussion of issues required by CEQA that are not covered in other chapters. This includes irreversible environmental changes, significant unavoidable impacts, reasons why the Project is being proposed notwithstanding significant unavoidable impacts, growth-inducing impacts, potential secondary effects related to Project mitigation measures , effects found not to be significant in the Initial Study, and effects found to be less than significant in the Draft EIR (before mitigation).
7. References. This chapter lists the references and sources used in the preparation of this Draft EIR.
8. List of EIR Preparers and Organizations and Persons Contacted. This chapter lists the persons, public agencies, and organizations that were consulted or who contributed to the preparation of this Draft EIR.
9. Standard Terms, Acronyms and Abbreviations. This chapter provides a reference listing of the common terms , acronyms and abbreviations that are used throughout this document, as well as definitions of key terms.
The Environmental Analyses in this Draft EIR are supported by the following appendices:
• Appendix A – Notice of Preparation (NOP), Initial Study, Scoping Meeting Materials, and Comments on the NOP
– A-1 Notice of Preparation
– A-2 Initial Study
– A-3 Scoping Meeting Materials
– A-4 Comments on the NOP
1. Introduction
City of Culver City 1-6 5700 Hannum Avenue Mixed-Use Residential and Commercial Project SCH No. 2023080709 April 2024
• Appendix B – Shadow Figures
• Appendix C – Air Quality and Greenhouse Gas Emissions Calculations • Appendix D – Archeological Resources Report
• Appendix E – Energy Calculations
• Appendix F – Paleontological Resources Report
• Appendix G – Noise Calculations
• Appendix H – Public Services Correspondence
– H-1 Culver City Fire Department Correspondence
– H-2 Culver City Police Department Correspondence
– H-3 Culver City Unified School District Correspondence – H-4 Culver City Parks, Recreation and Community Services Department Correspondence • Appendix I – Transportation Impact Study
• Appendix J – Water Civil Technical Memorandum
• Appendix K – Alternatives Documentation
1.4 Public Review of the Draft EIR
The Draft EIR is subject to a 45- day review period in which the document is made available to responsible and trustee agencies and interested parties. In compliance with the provision of CEQA Guidelines Sections 15085(a) and 15087, the City, serving as the Lead Agency: (1) prepared and transmitted a Notice of Completion (NOC) to the State Clearinghouse; (2) published a Notice of Availability (NOA) of a Draft EIR which indicated that the Draft EIR was available for public review at the City’s Current Planning Division; (3) provided copies of the NOA and Draft EIR to the Culver City Julian Dixon Library ; (4) posted the NOA and the Draft EIR on the City’s Planning Division website: https://www.culvercity.org/Active-Projects/5700-Hannum-Ave-Proposed-Project; (5) sent a NOA to all property owners within 500 feet of the Project Site; (6) sent a NOA to the last known name and address of all organizations and individuals who previously requested such notice in writing or attended public meetings about the Project; and (7) filed the NOA with the County Clerk.
Proof of publication is available at the Culver City Current Planning Division. The public review period commenced on April 4, 2024 and will end on May 20, 2023 for a total of 47 days.
Any public agency or members of the public desiring to comment on the Draft EIR must submit their comments in writing or send them via email to the following address prior to the end of the public review period:
Mail: Jose Mendivil
Associate Planner
City of Culver City Current Planning Division
9770 Culver Boulevard
Culver City, California 90232
Email: [email protected]
1. Introduction
City of Culver City 1-7 5700 Hannum Avenue Mixed-Use Residential and Commercial Project SCH No. 2023080709 April 2024
Upon the close of the public review period, the City will proceed to evaluate and prepare responses to all relevant oral and written comments received from public agencies and other interested parties during the public review period. A Final EIR will then be prepared. The Final EIR will consist of the Draft EIR, any necessary revisions to the Draft EIR, comments submitted by responsible agencies or reviewing parties during the public circulation period for the Draft EIR, and City responses to those comments. After the Final EIR is completed and at least 10 days prior to its certification by the City Planning Commission
1, responses to comments made by public agencies
on the Draft EIR will be provided to the commenting agencies.
1 Prior to approval of the Project, the City, as Lead Agency and decision-making entity, is required to certify that the Final EIR has been completed in compliance with CEQA, that the Project has been reviewed and the information in the Final EIR has been considered, and that the Final EIR reflects the independent judgement of the City.
1. Introduction
City of Culver City 1-8 5700 Hannum Avenue Mixed-Use Residential and Commercial Project SCH No. 2023080709 April 2024
This page intentionally left blank
City of Culver City 2-1 5700 Hannum Avenue Mixed-Use Residential and Commercial Project SCH No. 2023080709 April 2024
CHAPTER 2
Project Description
2.1 Introduction
5700 Hannum Owner, LLC c/o Lincoln Property Company, the Applicant, proposes to develop a mixed-use residential and commercial project on an approximately 2.23-acre (97,264 square feet [sf]) site (Project Site) located at 5700 Hannum Avenue within the Fox Hills neighborhood of the City of Culver City (City). The Project Site is currently developed with an existing two-story office building in the northern portion of the Project Site and associated surface parking. The Project would develop a new 6- story (up to a height 78-feet) mixed-use building with two ( 2) semi- subterranean levels, consisting of 309 residential units (including 27 Very Low Income units) and 5,600 square feet of retail space. The Project would provide a total of 7,507 square feet of publicly accessible open space, 19,526 square feet of private open space and 27,123 square feet of common open space (for residents) for a total of 54,156 square feet of open space. The building would be constructed atop two levels of semi-subterranean vehicular parking, with parking also provided on the first floor of the building. The Project would include a total of 428 vehicular par king spaces (399 residential, 6 guest and 23 commercial) within three parking levels. Two points of vehicular access would be provided to the Project Site, including a residential only driveway along Buckingham Parkway and a commercial and residential driveway along Hannum Avenue. The Project would also provide a total of 92 bicycle spaces, consisting of 11 short -term and 81 long- term bicycle parking spaces in compliance with Culver City Municipal Code (CCMC) requirements. The Project would also include private and publicly accessible open space . The Project would provide 7,507 square feet of publicly accessible open space as part of the Hannum Plaza fronting Hannum Avenue. Common open space would be available to residents including a centrally located courtyard, a community room on the second floor; a gym, an amenity deck, and a community room on the sixth floor.
2.2 Project Location and Surrounding Uses
The Project Site is located at 5700 Hannum Avenue in the southeastern portion of the City with regional access provided by the San Diego Freeway (1 -405) located approximately 0.7 mile west of the Project Site. Local access to the Project Site is provided via Hannum Avenue, Buckingham Parkway, and Uplander Way. The Project Site is located 0.6 mile east of the Culver City Transit Center and is not in one of the City’s four key Transit Priority Areas (TPA) identified in the City’s July 13, 2020 Transportation Study Criteria and Guidelines. See Figure 2-1, Regional and Project Vicinity Location, for the location of the Project Site. See Figure 2-2 , Project Location – Aerial Photograph, for an aerial image of the Project Site and surrounding development.
Path: U:\GIS\GIS\Projects\2022xxx\D202201041_5700_Hannum_Ave\03_Project\Fig2-1_Reg-Proj Vic Loc_8-30-23.mxd, dkaneshiro 8/30/2023 SOURCE: Open Street Map, 2023 5700 Hannum Avenue Mixed-Use Residential and Commercial Project Figure 2-1
Regional and Project Vicinity Location
N
0 300
Feet
Project Boundary
Project Site
Project Site
•
Healthcare
tions, Inc
0 r ESA
~
BRENTWOOD
ta Monica
Hannurn fl..\/e
•
odem Media
Culver City
+
LAX
El Segundo
Manhattan
Beach
ARLINGTO
HEIG.tJ.TS
LEIMERT
PARK
Hawthorne
Los Angel
So
WILLOWBROOK L
Gardena Compt
CJ