Cities Index.
2026-02-09_ATT 11 - Preliminary Development Plans

City Council Meeting Agenda
February 9, 2026

Document
2026-02-09_ATT 11 - Preliminary Development Plans
Meeting
February 9, 2026
Body
City Council Meeting Agenda
Original file
94.0 MB
Text extracted from the city's file for reading and search. Open the original on culver-city.legistar1.com. That file is the official record.

Robert F. Tuttle Architect, Inc.
38960 Vista Dawn Court
Temecula, CA 92592
Bob Tuttle
951 302-5444
[email protected]
Sitescapes
3190 B-2 Airport Loop Dr
Costa Mesa CA 92626
Rick Polhamus
949 644-9370
[email protected]
architect: civil engineer: landscape architect
Adkan Engineers
6879 Airport Drive
Riverside, CA 92504
Richard Reaves
951 688-0241
[email protected]
Robert F. Tuttle Architects, Inc. 1/16" = 1'-0"
8/19/2025 11:07:42 AM
A-0
Cover
Culver City Hotel August 19, 2025
984 11469 Jefferson Blvd Culver City, California
Attachment 4
Attachment 11
A-72
A-7
1 A-8
1 NORTH
Site statistics
Address: 11469 Jefferson Blvd.

Culver City CA 90230
APN: 4216 -028 -023
Site area: 34,051 s.f.
.78 acres
Hotel -5 Story
Basement -First Floor Type II -A
Second -Fifth Floor Type III -A
Guestrooms
Total 147 rooms
Building
Basement 32,329 s.f.

First floor 13,232 s.f. (lobby)
600 s.f (coffee shop)
Second floor 24,604 s.f.

Third floor 24,398 s.f.

Fourth floor 24,142 s.f.

Fifth floor 22,849 s.f.

Total bldg footage 142,154 s.f.

Parking
Basement 76 stalls (1 ADA)
EV 31
First Floor 29 stalls (4 ADA)
EV 12
Bicycle Racks 10 short, 10 long
loading 1
Total 105 stalls
Building height 55 feet to roof
60 feet to top of parapet
Environmental Programs and Operations Notes

1. Solid waste, recyclable waste material, and
organic waste handling shall
be performed exclusively by the City or its
authorized agents. The City Council may regulate,
by ordinance or resolution, all aspects of solid
waste,
recyclable waste material, and organic waste
handling, including, but not limited to, frequency of
collection, means of collection and transportation,
level of services, charges, fees, and nature,
location and extent of providing solid waste
handling services.

2. The City of Culver City shall provide waste
disposal and recycling services for all construction
and demolition projects within city limits in
accordance with CCMC 5.01.010.

3. Class III standpide system to be provided

4. Public fire hydrant to be provided within 150' -0"
of FDC & double -check assembly

5. Driveway and sidewalk shall be ADA compliant

6. Alley curb returns and driveway apron to be
reconstructed compliant with ADA requirements
Jefferson Boulevard
alley
A-8 2

RAMP DOWN TO GARAGE

ENTRY/EXIT

PARKING ON
GRADE - 29
STALLS
13 16
EXIT
ENTRY

PROPERTY LINE

PROPERTY LINE

PROPERTY LINE
30' - 0"
24' - 0"
18' - 0"
9' - 0" 9' - 0"
18' - 0"
30' - 0"
coffee shop
HOTEL
5 STORY
A-9
1 A-9
2 22' - 0"
13' - 0" 9' - 0"
12' - 11 3/8" 5' - 0" 9' - 0"
stor.
24' - 5"
15' - 0"
14' - 0"
15' - 0"
1 A-11

PROPOSED TRASH ENCLOSURE

WITH METAL ROOF
(4 - 3 cubic bins, 1 - 2 cubic bin)
LOADING SPACE PER CCMC 17.320.0502
19' X 40'. DELIVERY VEHICLES EXIT RIGHT INTO
ALLEY ONLY.

PROPOSED LOCATION FOR FIRE DEPARTMENT

FDC & DOUBLE CHECK ASSEMBLY
stair

PROJECT ADDRESS

DRIVEWAY CURB -CUT TO BE REPLACE

WITH FULL HEIGHT SIDEWALK

KNOX BOX PROPOSED

KNOX BOX PROPOSED

FIRE HOSE PULL
150 FEET

FIRE HOSE PULL
150 FEET

PUBLIC FIRE HYDRANT
10" DIA TREE TO BE REMOVED & REPLACED

PUBLIC FIRE HYDRANT

SHORT -TERM BICYCLE
PARKING SPACES (10)

DROP OFF
ADJACENT 2 -STORY

COMMERCIAL BUILDING
ADJACENT 1 -STORY

COMMERCIAL BUILDING

SUNKIST PARK

SINGLE -FAMILY RESIDENTIAL

NEIGHBORHOOD

STOP SIGN & STRIPING

TO BE ENHANCED
A-12
1 A-12
2 A-12 3

EV CAPABLE

ADA EV CHARGING EV CHARGING EV CHARGING

EV CAPABLE EV CAPABLE EV CAPABLE EV CAPABLE

EV READY EV READY EV READY EV CAPABLE
9' - 0" 8' - 0" 9' - 0"

RAMP UP OUT OF GARAGE
T
A-12
4 EXISTING ON -STREET PARKING

TO REMAIN
Robert F. Tuttle Architects, Inc. 3/32" = 1'-0"
8/19/2025 11:07:50 AM
A-1
Site Concept A
Culver City Hotel August 19, 2025
984 11469 Jefferson Blvd Culver City, California
3/32" = 1'-0" A-1
1 Site A
Guest Room Count
Name Count Level Department
DQ Studio 6 Level 2 Guestroom
K Studio 19 Level 2 Guestroom
K Studio B 4 Level 2 Guestroom
K Studio C 2 Level 2 Guestroom
K Studio D 2 Level 2 Guestroom
K Studio E 2 Level 2 Guestroom
K Studio F 3 Level 2 Guestroom
Level 2 38
DQ Studio 6 Level 3 Guestroom
K Studio 18 Level 3 Guestroom
K Studio B 5 Level 3 Guestroom
K Studio C 2 Level 3 Guestroom
K Studio D 2 Level 3 Guestroom
K Studio E 2 Level 3 Guestroom
K Studio F 3 Level 3 Guestroom
Level 3 38
DQ Studio 6 Level 4 Guestroom
K Studio 18 Level 4 Guestroom
K Studio B 4 Level 4 Guestroom
K Studio C 2 Level 4 Guestroom
K Studio D 2 Level 4 Guestroom
K Studio E 2 Level 4 Guestroom
K Studio F 3 Level 4 Guestroom
Level 4 37
DQ Studio 6 Level 5 Guestroom
K Studio 14 Level 5 Guestroom
K Studio B 9 Level 5 Guestroom
K Studio E 2 Level 5 Guestroom
K Studio F 3 Level 5 Guestroom
Level 5 34
Grand total 147
A-72
A-7
1 A-8
1 A-8 2
ramp up 15%
24' - 0" 18' - 6"
18' - 6"
elevators
76 STALLS
25 3
4 4
8 9
21 -
---
A-9
1 A-9
2 showers/lockers

EV READY

EV CAPABLE

EV CHARGING

EV CHARGING

EV CHARGING

EV CHARGING

EV CHARGING

EV CHARGING EV CHARGING EV CHARGING

EV READY

EV READY

EV READY

EV READY EV READY EV READY EV READY

EV CAPABLE EV CAPABLE EV CAPABLE

EV CAPABLE

ADA EV CHARGING
9' - 0"
5' - 0"
13' - 0"
9' - 0"
5' - 0"

EV CAPABLE

EV CAPABLE

EV CAPABLE

EV CAPABLE

EV CAPABLE

EV CAPABLE

EV CAPABLE

EV CAPABLE

EV CAPABLE

EV CAPABLE
bike storage
1 A-13
Robert F. Tuttle Architects, Inc. 3/32" = 1'-0"
8/19/2025 11:07:57 AM
A-1B
Basement Parking
Culver City Hotel August 19, 2025
984 11469 Jefferson Blvd Culver City, California
3/32" = 1'-0" A-1B
1 Level P1
A-72
A-7
1 A-8
1 boiler
main
electrical
front
desk
elev lobby
lobby
sales
gm
pbx
vestibule
den
pantry
fitness
stair
elev
equip
emp
lounge
laundry
linen
ramp down to parking level
drop off area
on grade parking
NORTH
17 14
stair
A-8 2
food prep
coffee shop
600 sf
restaurant + bar
work rm
ICE
women mens
chute
rr
dining
market
stg
A-9
1 A-9
2 bath
bath
storage
foyer
living room
storage
mech
stg
1 A-11
14' - 9"
restaurant
446
fitness
447
lobby
449
work
450
work
451 work
452
work
454
work
455
work
456
A-12
2 A-12 3
A-12
4 1
A-13
Robert F. Tuttle Architects, Inc. 3/32" = 1'-0"
8/19/2025 11:08:14 AM
A-2
Level 1 Floor Plan
Culver City Hotel August 19, 2025
984 11469 Jefferson Blvd Culver City, California
3/32" = 1'-0" A-2
1 Level 1 ground
A-72
A-7
1 A-8
1 NORTH
GG
II
JJ
KK
LL
MM
NN
PP
SS
UU
VV
WW
XX
18' - 10"
18' - 8"
18' - 8"
18' - 8"
18' - 8"
18' - 8"
18' - 8"
YY
ZZ
CCC
DDD
EEE
FFF
GGG
HHH
III

KKK LLL
A-8 2
R 95' - 0"
18' - 8" 18' - 8" 18' - 8" 18' - 8" 18' - 8" 18' - 10" 6' - 0" 26' - 7" 6' - 0"
bbq
pool
courtyard
fire
A-9
1 A-9
2 QQQ
RRR
TTT
UUU
VVV
WWW
18' - 8"
25' - 9"
25' - 9"
18' - 8"
18' - 8"
18' - 8"
XXX
XXX
18' - 8" 11' - 8"
YYY
ZZZ
AAAA
130' - 10"
30' - 4"
K Studio
201
K Studio
203
K Studio
205
K Studio
207
K Studio D
206
K Studio
209
K Studio
208
K Studio
211
K Studio
210
K Studio
213
K Studio
212
K Studio
215
K Studio
214
K Studio E
218
K Studio
222
K Studio
223
K Studio B
230
DQ Studio
229
DQ Studio
228
DQ Studio
227
DQ Studio
226
DQ Studio
225
DQ Studio
224
K Studio F
217
K Studio F
219
K Studio F
221
fire
K Studio D
231
K Studio
233
K Studio
235
K Studio
237 K Studio C
238
K Studio B
234
K Studio B
236
K Studio B
239
K Studio C
240
K Studio
241
Stair 2
242
Stair 1
200
K Studio
402
K Studio E
404
1 A-11
4' - 4"
4' - 4"
A-12 3
1 A-13
Robert F. Tuttle Architects, Inc. 3/32" = 1'-0"
8/19/2025 11:08:26 AM
A-3
Level 2 Floor Plan
Culver City Hotel August 19, 2025
984 11469 Jefferson Blvd Culver City, California
3/32" = 1'-0" A-3
1 Level 2
A-72
A-7
1 A-8
1 NORTH
GG
II
JJ
KK
LL
MM
NN
PP
SS
UU
VV
WW
XX
YY
ZZ
BBB
CCC
DDD
EEE
FFF
GGG
HHH
III

KKK LLL
A-8 2
R 95' - 0"
maids
3' - 0"
A-9
1 A-9
2 QQQ
RRR
TTT
UUU
VVV
WWW
XXX
YYY
ZZZ
AAAA
K Studio F
317
K Studio F
319
K Studio F
321
K Studio
301
K Studio
303
K Studio
305
K Studio
307
K Studio B
306
K Studio
309
K Studio
308
K Studio
311
K Studio
310
K Studio
313
K Studio
312
K Studio
315
K Studio
314
K Studio E
318
K Studio
322
K Studio
323
K Studio B
330
DQ Studio
329
DQ Studio
328
DQ Studio
327
DQ Studio
326
DQ Studio
325
DQ Studio
324
was 8 units
now 6 units on level 3
K Studio D
341
K Studio
340
K Studio B
339
K Studio B
336
K Studio C
338
K Studio
337
K Studio
335
K Studio
333
K Studio D
331
Stair 2
342
K Studio B
334
Stair 1
300
K Studio C
416
K Studio E
445
1 A-11
1 A-13
Robert F. Tuttle Architects, Inc. 3/32" = 1'-0"
8/19/2025 11:08:41 AM
A-4
Level 3 Floor Plan
Culver City Hotel August 19, 2025
984 11469 Jefferson Blvd Culver City, California
3/32" = 1'-0" A-4
1 Level 3
A-72
A-7
1 A-8
1 NORTH
GG
II
JJ
KK
LL
MM
NN
PP
SS
UU
VV
WW
XX
YY
ZZ
CCC
DDD
EEE
FFF
GGG
HHH
III

KKK LLL
A-8 2
maids
3' - 0"
A-9
1 A-9
2 QQQ
RRR
TTT
UUU
VVV
WWW
XXX
YYY
ZZZ
AAAA
K Studio B
436
DQ Studio
429
DQ Studio
428
DQ Studio
427
DQ Studio
426
DQ Studio
425
DQ Studio
424
K Studio B
439
K Studio
403
K Studio
405
K Studio
407
K Studio
406
K Studio
409
K Studio
408
K Studio
411
K Studio
410
K Studio
413
K Studio
412
K Studio
415
K Studio E
418
K Studio
422
K Studio
423
K Studio B
430
K Studio D
431 K Studio
433
K Studio
435
K Studio B
434
K Studio
437
K Studio C
438
K Studio
440
K Studio F
417
K Studio F
419
K Studio F
421
was 9 units
now 5 units on level 4
K Studio D
441
Stair
400
Stair 2
442
K Studio C
420
K Studio E
432
K Studio
414
1 A-11
1 A-13
Robert F. Tuttle Architects, Inc. 3/32" = 1'-0"
8/19/2025 11:08:57 AM
A-5
Level 4 Floor Plan
Culver City Hotel August 19, 2025
984 11469 Jefferson Blvd Culver City, California
3/32" = 1'-0" A-5
1 Level 4
A-72
A-7
1 A-8
1 GG
II
JJ
KK
LL
MM
NN
PP
SS
UU
VV
WW
XX
YY
ZZ
BBB
CCC
DDD
EEE
FFF
GGG
HHH
III

KKK LLL
A-8 2
NORTH
3' - 0"
A-9
1 A-9
2 QQQ
RRR
TTT
UUU
VVV
WWW
XXX
YYY
ZZZ
AAAA
K Studio F
517
K Studio F
519
K Studio F
521
K Studio
503
K Studio
505
K Studio
507
K Studio
509
K Studio
508
K Studio
511
K Studio
510
K Studio
513
K Studio
512
K Studio
515
K Studio
514
K Studio E
518
K Studio
522
K Studio
523
K Studio B
530
K Studio B
533
K Studio B
535
K Studio B
537
K Studio B
539
DQ Studio
529
DQ Studio
528
DQ Studio
527
DQ Studio
526
DQ Studio
525
DQ Studio
524
was 9 units
now 3 units on level 5
4' - 9"
K Studio B
534
K Studio B
536
K Studio B
538
K Studio
506
Stair
500
K Studio B
443
K Studio E
444
1 A-11
1 A-13
Robert F. Tuttle Architects, Inc. 3/32" = 1'-0"
8/19/2025 11:09:15 AM
A-6
Level 5 Floor Plan
Culver City Hotel August 19, 2025
984 11469 Jefferson Blvd Culver City, California
3/32" = 1'-0" A-6
1 Level 5
Level 1 ground
0' - 0"
Level 2
15' - 0"
Level 3
25' - 0"
Level 4
35' - 0"
Roof
55' - 0"
Level P1
-11' - 0"
Level 5
45' - 0"
60' - 0"
15' - 0" 10' - 0" 10' - 0" 10' - 0" 10' - 0" 5' - 0"
10' - 0"
60' - 0"
03 03
06 02 01
02 06
06 03
03 04
07 08
09 02
01 Level 1 ground
0' - 0"
Level 2
15' - 0"
Level 3
25' - 0"
Level 4
35' - 0"
Roof
55' - 0"
Level P1
-11' - 0"
Level 5
45' - 0"
15' - 0" 10' - 0" 10' - 0" 10' - 0" 10' - 0" 5' - 0"
71' - 0"
-
---
60' - 0"
10' - 0"
48' - 0"
60' - 0"
02 03
06 02
05 06 03 02
05 02
04 03
Robert F. Tuttle Architects, Inc. 1/8" = 1'-0"
8/19/2025 11:10:34 AM
A-7
Exterior Elevations
Culver City Hotel August 19, 2025
984 11469 Jefferson Blvd Culver City, California
1/8" = 1'-0" A-7
1 West Elevation
1/8" = 1'-0" A-7
2 North Elevation
Keynote Legend
Key Value Keynote Text
01 TILE: MSI 12X12 POLISHED GRANITE TILE, "ABSOLUTE BLACK" 02 STUCCO FIELD: MATCH DUNN EDWARDS DE6225 "FOSSIL"; 3 COAT STUCCO 03 STUCCO ACCENT: MATCH DUNN EDWARDS DE6370 "CHARCOA L SMUDGE"; 3 COAT STUCCO 04 STUCCO ACCENT: MATCH DUNN EDWARDS DE6217 "ANCIENT EARTH"; 3 COAT STUCCO 05 HORIZONTAL BANDS: BRUSHED STAINLESS STEEL;
06 FLASHING: PAINTED STEEL DUNN EDWARDS DE6350 "DARK ENGINE" 07 WINDOW FRAMES: FACTORY FINISH BRUSHED ALUMINUM
08 GLAZING: 1" DOUBLE GLAZED LOW-E INSULATED "CLEAR"
09 CANOPY AND DOORS: PAINTED STEEL DUNN EDWARDS DEA0 02 "BLACK" Level 1 ground
0' - 0"
Level 2
15' - 0"
Level 3
25' - 0"
Level 4
35' - 0"
Roof
55' - 0"
Level P1
-11' - 0"
Level 5
45' - 0"
60' - 0"
5' - 0" 10' - 0" 10' - 0" 10' - 0" 10' - 0" 15' - 0"
5' - 6" 5' - 0"
10' - 0"
71' - 0"
10' - 0"
11' - 0"
02 06 03 01
05 09
06 04
09 09
06 02
01 07
08 02
Level 1 ground
0' - 0"
Level 2
15' - 0"
Level 3
25' - 0"
Level 4
35' - 0"
Roof
55' - 0"
Level P1
-11' - 0"
Level 5
45' - 0"
60' - 0"
15' - 0" 10' - 0" 10' - 0" 10' - 0" 10' - 0" 5' - 0"
-
--- 02 06 05 01 02 03
06 02
03 09 04
06 02
01 07 08
Robert F. Tuttle Architects, Inc. 1/8" = 1'-0"
8/19/2025 11:12:48 AM
A-8
Exterior Elevations
Culver City Hotel August 19, 2025
984 11469 Jefferson Blvd Culver City, California
1/8" = 1'-0" A-8
1 East Elevation
1/8" = 1'-0" A-8
2 South Elevation
Keynote Legend
Key Value Keynote Text
01 TILE: MSI 12X12 POLISHED GRANITE TILE, "ABSOLUTE BLACK" 02 STUCCO FIELD: MATCH DUNN EDWARDS DE6225 "FOSSIL"; 3 COAT STUCCO 03 STUCCO ACCENT: MATCH DUNN EDWARDS DE6370 "CHARCOA L SMUDGE"; 3 COAT STUCCO 04 STUCCO ACCENT: MATCH DUNN EDWARDS DE6217 "ANCIENT EARTH"; 3 COAT STUCCO 05 HORIZONTAL BANDS: BRUSHED STAINLESS STEEL;
06 FLASHING: PAINTED STEEL DUNN EDWARDS DE6350 "DARK ENGINE" 07 WINDOW FRAMES: FACTORY FINISH BRUSHED ALUMINUM
08 GLAZING: 1" DOUBLE GLAZED LOW-E INSULATED "CLEAR"
09 CANOPY AND DOORS: PAINTED STEEL DUNN EDWARDS DEA0 02 "BLACK" Level 1 ground
0' - 0"
Level 2
15' - 0"
Level 3
25' - 0"
Level 4
35' - 0"
Roof
55' - 0"
Level P1
-11' - 0"
Level 5
45' - 0"
60' - 0"
11' - 0" 7' - 8"
6' - 0"
5' - 6"
5' - 0"
10' - 0"
60' - 0"
15' - 0" 10' - 0" 10' - 0" 10' - 0" 10' - 0" 5' - 0"
38' - 6"
48' - 0"
02 06
07 08
02 06 03
09 07
03 06
05 04 03
09 01 01
Level 1 ground
0' - 0"
Level 2
15' - 0"
Level 3
25' - 0"
Level 4
35' - 0"
Roof
55' - 0"
Level P1
-11' - 0"
Level 5
45' - 0"
1 A-10
60' - 0"
15' - 0" 10' - 0" 10' - 0" 10' - 0" 10' - 0" 5' - 0"
10' - 0"
1 A-11
5' - 0"
1 A-13
10' - 0"
60' - 0"
48' - 0"
38' - 6"
5' - 4"
7' - 6"
6' - 0"
03 06
02 02 06 03
02 05
03 04
02 06
03 01
08 07
05 Robert F. Tuttle Architects, Inc. 1/8" = 1'-0"
8/19/2025 11:14:12 AM
A-9
Exterior Elevations
Culver City Hotel August 19, 2025
984 11469 Jefferson Blvd Culver City, California
1/8" = 1'-0" A-9
1 South 2 Elevation
1/8" = 1'-0" A-9
2 West 2 Elevation
Keynote Legend
Key Value Keynote Text
01 TILE: MSI 12X12 POLISHED GRANITE TILE, "ABSOLUTE BLACK" 02 STUCCO FIELD: MATCH DUNN EDWARDS DE6225 "FOSSIL"; 3 COAT STUCCO 03 STUCCO ACCENT: MATCH DUNN EDWARDS DE6370 "CHARCOA L SMUDGE"; 3 COAT STUCCO 04 STUCCO ACCENT: MATCH DUNN EDWARDS DE6217 "ANCIENT EARTH"; 3 COAT STUCCO 05 HORIZONTAL BANDS: BRUSHED STAINLESS STEEL;
06 FLASHING: PAINTED STEEL DUNN EDWARDS DE6350 "DARK ENGINE" 07 WINDOW FRAMES: FACTORY FINISH BRUSHED ALUMINUM
08 GLAZING: 1" DOUBLE GLAZED LOW-E INSULATED "CLEAR"
09 CANOPY AND DOORS: PAINTED STEEL DUNN EDWARDS DEA0 02 "BLACK" Level 1 ground
0' - 0"
Level 2
15' - 0"
Level 3
25' - 0"
Level 4
35' - 0"
Roof
55' - 0"
LL
Level P1
-11' - 0"
Level 5
45' - 0"
Level 1 ground
0' - 0"
Level 2
15' - 0"
Level 3
25' - 0"
Level 4
35' - 0"
Roof
55' - 0"
Level P1
-11' - 0"
Level 5
45' - 0"
Robert F. Tuttle Architects, Inc. 1/8" = 1'-0"
8/19/2025 11:14:39 AM
A-10
Sections
Culver City Hotel August 19, 2025
984 11469 Jefferson Blvd Culver City, California
1/8" = 1'-0" A-10
1 Section 2
1/8" = 1'-0" A-10
2 Section 3
Level 1 ground
0' - 0"
Level 2
15' - 0"
Level 3
25' - 0"
Level 4
35' - 0"
Roof
55' - 0"
LL
Level 5
45' - 0"

60.00°
centerline of alley
property line
alley
property line
setback line
setback line
15' - 0" 10' - 0" 5' - 0"
30' - 0"
Robert F. Tuttle Architects, Inc. 1/4" = 1'-0"
8/19/2025 11:14:44 AM
A-11
Section at Alley + Setback
Culver City Hotel August 19, 2025
984 11469 Jefferson Blvd Culver City, California
1/4" = 1'-0" A-11
1 Section 5
3 CUBIC YARD

COMMERCIAL

RECYCLING
2 CUBIC YARD

ORGANICS

COLLECTION
6" CONCRETE CURB, TYP.

METAL TRASH

ENLOSURE GATE -DOUBLE

METAL TRASH

ENCLOSURE GATE - SINGLE
8" PCC CONCRETE W/ #4
BARS @ 18" EACH WAY
30' - 3"
14' - 7" 20' - 0"

PEDESTRIAN
ACCESS
5' - 0"
3' - 7"

CL ALLEY
3 CUBIC YARD

COMMERCIAL
TRASH

FLOOR DRAIN

HOSE BIB
1' - 3 5/8" 5' - 1" 0' - 8" 11' - 4" 1' - 8" 11' - 4" 1' - 5 5/8" 32' - 10 1/4"
3 CUBIC YARD

COMMERCIAL

RECYCLING
4' - 5"
6' - 11"
2' - 0"
0' - 5"
3 CUBIC YARD

COMMERCIAL

RECYCLING
Level 1 ground
0' - 0"

PAINTED STEEL
GATE

HSS PER

STRUCTURAL

STANDING SEAM

ROOFING OVER

METAL DECK

OPEN HSS PER

STRUCTURAL

PAINTED STEEL
GATE
6' - 6" 2' - 6"
Level 1 ground
0' - 0"
Level 2
15' - 0"
6' - 6"

STANDING SEAM METAL

ROOFING OVER METAL DECK

SPLIT FACE BLOCK

OR FINISH STUCCO
6' - 6" 2' - 6 31/32"

HOTEL BUILDING
3' - 6"
Level 1 ground
0' - 0"
6' - 6"

STANDING SEAM METAL

ROOFING OVER METAL DECK

SPLIT FACE BLOCK

OR FINISH STUCCO

PEDESTRIAN ACCESS

HOTEL ABOVE
Robert F. Tuttle Architects, Inc. 3/8" = 1'-0"
8/19/2025 11:15:20 AM
A-12
Trash Enclosure
Culver City Hotel August 19, 2025
984 11469 Jefferson Blvd Culver City, California
3/8" = 1'-0" A-12
1 Trash Enclosure Plan
3/8" = 1'-0" A-12
2 Trash Enclosure Front Elevation
3/8" = 1'-0" A-12
3 Trash Enclosure Side Elevation
3/8" = 1'-0" A-12
4 Trash Enclosure Rear Elevation
Robert F. Tuttle Architects, Inc.
8/19/2025 11:15:21 AM
A-14
Rendering
Greens Development Culver City Hotel August 19, 2025
984 11469 Jefferson Blvd Culver City, California 16530 Bake Parkway, Suite 200, Irvine, CA 92618

Robert F. Tuttle Architects, Inc.
8/19/2025 11:15:22 AM
A-15
Rendering
Culver City Hotel August 19, 2025
984 11469 Jefferson Blvd Culver City, California
Robert F. Tuttle Architects, Inc.
8/19/2025 11:15:23 AM
A-16
Rendering
Culver City Hotel August 19, 2025
984 11469 Jefferson Blvd Culver City, California

Robert F. Tuttle Architects, Inc.
8/19/2025 11:15:23 AM
A-17
Rendering
Culver City Hotel August 19, 2025
984 11469 Jefferson Blvd Culver City, California

Robert F. Tuttle Architects, Inc.
8/19/2025 11:15:23 AM
A-18
Rendering
Culver City Hotel August 19, 2025
984 11469 Jefferson Blvd Culver City, California

← All documents from this meeting