CULVER CITY TRANSFER STATION

STORMWATER DIVERSION

SYSTEM UPGRADES

SHEET LIST TABLE

BASIS OF BEARINGS

ABBREVIATIONS

UTILITY COMPANY CONTACTS
LEGEND

SYMBOLS

ENGINEER'S NOTICE TO CONTRACTOR

LOCATION MAP

TITLE SHEET
T-01

COMPANY

CONTACT
PHONE NO.

SHT.

NO.

DRAWING
NO.

SHEET TITLE

BENCHMARK

RIGHT-OF-WAY

PROJECT LOCATION

PROJECT

LOCATION

VICINITY MAP
Project Number: F25585
Drawing No.

CULVER CITY TRANSFER STATION

STORMWATER DIVERSION SYSTEM UPGRADES
Z:\F25585\06 Tasks\D1 Design\80 Storm Drain\F25585 - T01 - Title Sheet PLOTTED: 11/07/2025
65% CONSTRUCTION PLAN
ENVIRONMENTAL PROGRAMS & OPERATIONS - CULVER CITY, CALIF.

CITY OF CULVER CITY

PUBLIC WORKS DEPARTMENT

VERTICAL DATUM
DESIGN & CONSTRUCTION STANDARDS:

PUBLIC NOTIFICATION REQUIREMENTS:

PUMP NOTES:

GENERAL NOTES:

SEQUENCE OF OPERATION:

GENERAL NOTES:

EXISTING & PROPOSED UTILITIES
’

JOB SITE

SURVEY & LAYOUT

PUBLIC HEALTH, SAFETY & WELFARE

TREE PROTECTION
·
·

MISCELLANEOUS
Project Number: F25585
Drawing No.

CULVER CITY TRANSFER STATION

STORMWATER DIVERSION SYSTEM UPGRADES
Z:\F25585\06 Tasks\D1 Design\80 Storm Drain\F25585 - C01- General Notes PLOTTED: 11/07/2025
65% CONSTRUCTION PLAN
ENVIRONMENTAL PROGRAMS & OPERATIONS - CULVER CITY, CALIF.

CITY OF CULVER CITY

PUBLIC WORKS DEPARTMENT

GENERAL, PUMP, AND CONSTRUCTION NOTES
CONSTRUCTION NOTES:

C-01

JEFFERSON BLVD
LINE "B"
S= 0.003
LINE "A"
S= 0.010
LINE "B"
S= 0.003
LINE "B"
S= 0.005

4.8'

3.0'

7.7'
10+00
10+50
11+00
11+50
12+00
12+50
13+00
STORM DRAIN LINE "A"
STORM DRAIN LINE "B"
Project Number: F25585
Drawing No.

CULVER CITY TRANSFER STATION

STORMWATER DIVERSION SYSTEM UPGRADES
Z:\F25585\06 Tasks\D1 Design\80 Storm Drain\F25585 - C02&C03 - Construction Plan_v8 PLOTTED: 11/07/2025
65% CONSTRUCTION PLAN
ENVIRONMENTAL PROGRAMS & OPERATIONS - CULVER CITY, CALIF.

CITY OF CULVER CITY

PUBLIC WORKS DEPARTMENT
MATCH LINE - SEE SHEET C-03
C-02
CONSTRUCTION NOTES:

NOTES:

PLAN VIEW
B

SECTION 'A'
A

SECTION 'B'

JEFFERSON BLVD
LINE "B"
S= 0.005
LINE "B"
S= 0.005
13+50
14+00
14+50
15+00
15+50
16+00
16+50
Project Number: F25585
Drawing No.

CULVER CITY TRANSFER STATION

STORMWATER DIVERSION SYSTEM UPGRADES
Z:\F25585\06 Tasks\D1 Design\80 Storm Drain\F25585 - C02&C03 - Construction Plan_v8 PLOTTED: 11/07/2025
65% CONSTRUCTION PLAN
ENVIRONMENTAL PROGRAMS & OPERATIONS - CULVER CITY, CALIF.

CITY OF CULVER CITY

PUBLIC WORKS DEPARTMENT
MATCH LINE - SEE SHEET C-02
C-03
STORM DRAIN LINE "B"
NOTES:

CONSTRUCTION NOTES:

D
C

SECTION D-D

PLAN VIEW
D

SECTION 'C'

DISCHARGE AT STATION

FINSIHED GRADE

ADDITIONAL OPTIONS

CONTROL PANEL SS ENCLOSURE

CONTROL PANEL AC UNIT

GENERATOR RECEPTACLE

CONTROL PANEL REMOTE ALARM MONITORING

CONCRETE WATERPROOFING

ODOR CONTROL VALVE

AIR RELEASE/VACUUM VALVE

INTERIOR LINER

VENT PIPE

LIFTING CRANE

VARIABLE FREQENCY DRIVE(S)
OPTION

AVAILABLE POWER SUPPLY

AVAILABLE POWER PHASE

APPLICATION
TOTAL DYNAMIC HEAD (Ft.)

PUMP MAKE & MODEL
PUMP MOTOR (Std / XP)

PUMP TYPE

PUMP RATED HP & CURRENT
DESIGN FLOW (gpm)

LAG PUMP ON

PUMP(S) OFF

HIGH WATER ALARM

LEAD PUMP ON

LOW WATER ALARM

WET WELL FLOOR

FORCE MAIN HIGH POINT

DESCRIPTION

BILL OF MATERIALS
ITEM
1 2
3 4
5 6
7 8
1 1
1 1
1 1

PROJECT SPECIFIC INFORMATION

SYSTEM CHARACTERISTICS

CONTROL PANEL AUTODIALER

CONCRETE WET WELL ASSEMBLY

PUMP PACKAGE

LIFTOUT PACKAGE

PIPING PACKAGE

CONTROL PACKAGE

ACCESS HATCH
ASTM C1802 Hatch Load Level

PIPE DIAMETER

PIPE MATERIAL

PANEL TYPE
RIM

EPOXY COATED PIPING
QTY
INLET
YES
NO

79.00'

79.00'

89.00'

76.00'

65.50' - 65.50' - 71.01'

65.50'

64.20'

63.20'

62.00'

61.50'

60.17'
99 31.7
HOMA - AMS336-220/3,8T/C FM

3.8HP - 5.5FLA
Sewage
XP/FM
Three
480V
Non-Clog
PVC Sch 80
3"
Level 5
F
(QTY 3) 3" CORE HOLES

FOR ELECTRICAL CONDUIT
*ELECTRICAL DESIGN BY OTHERS*

INLET PIPING TO BE INSTALLED,

CORED & SEALED BY OTHERS
Ø5'-0" WET WELL I.D.

Ø6'-0" WET WELL O.D.

ANTI-FLOTATION COLLAR

OPTIONAL VENT PIPING

SINGLE DOOR ACCESS HATCH
w/ 28" x 40" CLEAR OPENING
3" OUTLET INVERT - ELEV.

TO STORAGE TANK
*CONNECTION TO FORCE

MAIN DESIGNED &

INSTALLED BY OTHERS
NOTES
MATERIALS:

1. PRECAST MATERIALS AND MANUFACTURING METHODS SHALL CONFORM TO ASTMC-478, C-857 AND LACSD S-A-206, WHEN IN LA COUNTY.

2. CONCRETE SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH F'c = 5,000-psi AT 28-DAYS.

3. THE PORTLAND CEMENT USED IN THE PRECAST SECTION SHALL MEET THE REQUIREMENTS OF TYPE II/V HIGH SULFATE RESISTANT CEMENT IN ACCORDANCE WITH ASTM CLASS M C-150.

4. MANHOLE COMPONENTS CONFORM TO CURRENT SPECIFICATIONS, ASTM, C-478 AND AASHTO M199.

5. FLAT TOPS AND BASE SLABS ARE DESIGNED FOR ASSHTO HS-20 WHEEL LOADING.

6. ALL PRECAST CONCRETE COMPONENTS TO BE MANUFACTURED IN AN NPCA CERTIFIED PLANT. a
DESIGN NOTES / DISCLAIMERS:

1. CONTROL PANEL INSTALLATION, MOUNTING DESIGN & HARDWARE BY OTHERS.

2. FINAL CONTROL PANEL LOCATION TO BE DETERMINED ACCORDING TO PROJECT REQUIREMENTS. CONSULT ALL SUBMITTED PUMP AND LEVEL CONTROL CABLE LENGTHS WHEN DETERMINING THE CONTROL PANEL LOCATION.

3. ALL FOUNDATION, SUBGRADE, AND BACKFILL DESIGNED BY OTHERS.

4. ALL PRECAST CORING TO BE DONE IN FIELD BY OTHERS UNLESS OTHERWISE NOTED.

5. ALL MATERIAL TO BE ASSEMBLED/INSTALLED IN FIELD BY OTHERS.

RIM - ELEV.

SEE NOTES #1 & #2
WET WELL FLOOR - ELEV.

LOW WATER LEVEL ALARM - ELEV.

PUMPS OFF - ELEV.

LEAD PUMP ON - ELEV.

LAG PUMP ON - ELEV.

INLET INVERT - ELEV.

HIGH WATER LEVEL ALARM - ELEV.
6" INLET INVERT - ELEV.

FROM ONSITE RUNOFF
3" INLET INVERT - ELEV.

FROM CONC. WALL STRUCTURE
SEE NOTE #3

58.00"

34.00"

46.00"

20.00"

14.00"

00.00 18.83'

13.50'

4.00'

64.0"

70.70'

65.50'
3" OUTLET INVERT - ELEV.

TO STORAGE TANK
Project Number: F25585
Drawing No.

CULVER CITY TRANSFER STATION

STORMWATER DIVERSION SYSTEM UPGRADES
Z:\F25585\06 Tasks\D1 Design\80 Storm Drain\F25585 - C04- Pump Station Details (CAD) PLOTTED: 11/07/2025
65% CONSTRUCTION PLAN
ENVIRONMENTAL PROGRAMS & OPERATIONS - CULVER CITY, CALIF.

CITY OF CULVER CITY

PUBLIC WORKS DEPARTMENT
DISCLAIMERS, INCLUDING BUT NOT LIMITED TO:

1. ALL ELEVATIONS HAVE BEEN PROVIDED BY OTHERS, AND HAVE NOT BEEN VERIFIED BY JENSEN INFRASTRUCTURE.

CONTRACTOR TO VERIFY ALL DIMENSIONS AND ELEVATIONS IN FIELD PRIOR TO INSTALLATION.

2. THESE LAYOUT DRAWINGS ARE INTENDED TO SHOW OVERALL SYSTEM DESIGN ONLY. ALL CONCRETE COMPONENT

THICKNESSES, DIMENSIONS, AND JOINT ORIENTATIONS MAY VARY ACROSS JENSEN INFRASTRUCTURE'S MANUFACTURING FACILITIES. CONTRACTOR TO CONFIRM ALL THICKNESSES, DIMENSIONS, AND JOINT ORIENTATIONS PRIOR TO INSTALLATION.

3. SYSTEM DESIGN CRITERIA HAS BEEN PROVIDED TO JENSEN INFRASTRUCTURE. OTHERS ARE RESPONSIBLE FOR VERIFICATION THAT SYSTEM MEETS INTENDED APPLICATION.

4. FOUNDATION, SUBGRADE, AND BACKFILL TO BE DESIGNED BY OTHERS.

C-04

PUMP STATION DETAILS

PROFILE VIEW
N.T.S.

PLAN VIEW
N.T.S.

Project Number: F25585
Drawing No.

CULVER CITY TRANSFER STATION

STORMWATER DIVERSION SYSTEM UPGRADES
Z:\F25585\06 Tasks\D1 Design\80 Storm Drain\F25585 - C05- Concrete Wall Structure Details PLOTTED: 11/07/2025
65% CONSTRUCTION PLAN
ENVIRONMENTAL PROGRAMS & OPERATIONS - CULVER CITY, CALIF.

CITY OF CULVER CITY

PUBLIC WORKS DEPARTMENT

CONCRETE WALL STRUCTURE DETAILS
C-05
DESIGN DATA:

ENLARGED DETAIL 'S'

PLAN VIEW

CONCRETE RETAINING STRUCTURES

SECTION W-W
Project Number: F25585
Drawing No.

CULVER CITY TRANSFER STATION

STORMWATER DIVERSION SYSTEM UPGRADES
Z:\F25585\06 Tasks\D1 Design\80 Storm Drain\F25585 - C06- Details PLOTTED: 11/07/2025
65% CONSTRUCTION PLAN
ENVIRONMENTAL PROGRAMS & OPERATIONS - CULVER CITY, CALIF.

CITY OF CULVER CITY

PUBLIC WORKS DEPARTMENT

DETAILS
C-06

INSULATED PIPE THROUGH NON-RATED WALL DETAIL
NOTE:

PIPE TO WALL CONNECTION DETAIL