CITY COUNCIL STAFF REPORT
Meeting: May 17, 2022

Subject
Consider the Fiscal Year (FY) 2022‐23 Fee Schedule Update

Recommended Action
Adopt Resolution No. 22‐049 approving FY 2022‐23 Fee Schedules A, B, C, D, and E effective July 18, 2022.

Summary
The City reviews user fees each year in conjunction with budget preparation. City policy ensures that, to the extent possible, fees cover the cost of providing services. The majority of the fees proposed for adoption are based on the estimated actual cost to perform the service. Some fees, such as those for recreational purposes, are based on market conditions or fees charged by outside service providers and other governments. The General Fund subsidizes fees that do not generate sufficient revenue to cover the cost of service.

Background and Recommendation
The  City  revised  the  Fiscal  Year  (FY)  2016‐17  Fee  Schedule  after  a  comprehensive  Fee Study was completed in conjunction with a Cost Allocation Study. The studies analyzed the Cityʹs costs and fees to determine costs that can be allocated between City departments and costs that can be recovered through fees charged to the public. The City conducted approximately every seven years. Staff has submitted a budget proposal in the FY 2022‐ 23  Proposed  Budget  for  the  next  comprehensive  fee  study.  If  the  budget  proposal  is approved, staff plans to develop a Request for Proposal (RFP) and complete the study in FY 2022‐23.

The City adjusts fees between studies using either the Bay Area Consumer Price Index (CPI), Bay Area Construction Cost Index (CCI), or budgeted labor costs. For FY 2022‐23, the CPI increase is 5.2%, the CCI increase is 9.8%, and the labor cost increase is 1.0%, as

shown below.

February
2021
February
2022  Index Increase  % Increase
Consumer Price
Index for All
Urban Consumers
(CPI‐U)
304.39  320.20  15.81  5.2%
Construction Cost
Index (CCI)  13,110.16  14,396.70  1,286.54  9.8%
Budgeted Labor
Costs   $37,422,3321    $37,781,3962   $359,064   1.0%
1 Base Salary and Benefits (FY 2021‐22 Amended Budget as of 2/28/2022) 2 Base Salary and Benefits (FY 2022‐23 Proposed Budget as of 2/28/2022)

The  City  is  currently  negotiating  with  its  bargaining  groups  because  labor  agreements expire on June 30, 2022. Due to the uncertainty, the labor cost increase only accounts for step increases and changes in CalPERS retirement rates. The labor cost increase does not include any cost‐of‐living adjustments (COLA) or equity adjustments. As a result, in FY 2023‐24, the labor cost factor will consist of a true‐up for FY 2022‐23 and the normal labor cost increase for FY 2023‐24.

The  CPI  increase  was  applied  to
Schedules  A  and  C,  the  CCI  increase  was  applied  to Schedule B, and the estimated labor cost increase was applied to Schedules B, C, and D to produce the Cityʹs recommendations described in more detail below. No escalator was applied to Schedule E, as Parks and Recreation fees are market‐driven to be competitive with entities that offer competing services.

In FY 2016‐17, Matrix Consulting Group, a City consultant, completed a comprehensive Fee Study, which informed the FY 2016‐17 fee schedule update. The changes to fees since FY 2016‐17 are summarized in the table below:

Fiscal Year  Schedule A –
General Fees
Schedule B –
Engineering
Fees
Schedule C –
Planning Fees
Schedule D –
Building Fees
2022‐23
(proposed)  5.2% CPI

9.8% CCI

1.0% Estimated
Labor Cost
Increase

5.2% CPI

1.0% Estimated
Labor Cost
Increase

1.0% Estimated
Labor Cost
Increase
2021‐22  1.6% CPI

2.5% CCI

5.7% Estimated
Labor Cost
Increase

1.6% CPI

5.7% Estimated
Labor Cost
Increase

5.7% Estimated
Labor Cost
Increase
2020‐21  2.91% CPI

6.3% CCI

17.3% Estimated
Labor Cost
increase

17.3% Estimated
Labor Cost
increase

17.3% Estimated
Labor Cost
increase

Fiscal Year  Schedule A –
General Fees
Schedule B –
Engineering
Fees
Schedule C –
Planning Fees
Schedule D –
Building Fees
2019‐20  3.53% CPI

1.0% CCI

4.0% Estimated
Labor Cost
Increase

4.0% Estimated
Labor Cost
Increase

4.0% Estimated
Labor Cost
Increase
2018‐19  3.55% CPI

3.5% CCI

4.1% Estimated
Labor Cost
Increase

4.1% Estimated
Labor Cost
Increase

4.1% Estimated
Labor Cost
Increase
2017‐18  3.44% CPI

11.2% Estimated
Labor Cost
Increase

11.2% Estimated
Labor Cost
Increase

11.2% Estimated
Labor Cost
Increase
2016‐17  Varied and comprehensive changes due to Fee Study.

New Fees and Substantial Changes

Schedule  A  –  General:   A  5.2%  CPI  increase  has  been  applied  to  all  applicable  fees  in Schedule A. Increases to these fees are mostly impacted by the cost of materials or external prices that are not under the control of the City. The following addition is proposed for Schedule A:

 Animal Establishment Permit
o An ʺ Animal  Establishment  Permitʺ  category  is  being  added.  An  existing fee, ʺ Commercial  Kennel  Permit,ʺ  is  being  moved  to  this  category.  New fees  for ʺ Private  Kennel,ʺ  ʺPet  Shop,ʺ  ʺGrooming  Business,ʺ  and ʺ Horse Establishmentʺ  are  also  being  added  to  this  category.  The  new  fees  are proposed at the same rates as the ʺCommercial Kennel Permit.ʺ

Schedule B – Engineering:   A 9.8% CCI or 1.0% labor cost increase has been applied to fees  in  Schedule  B,  except  for  Park  Land  Dedication  In‐Lieu  Fees  and  Transportation Impact Fees.

 Park Land Dedication In‐Lieu Fees and Transportation Impact Fees o Park  Land  Dedication  In‐Lieu  Fees  are  calculated  per  Municipal  Code section 13.08. On an annual basis, the Public Works Department updates the fair market value of land within the City based on the appraised values of land sales.
o The  Public  Works  Department  is  continuing  to  evaluate  Parkland Dedication  and  Transportation  Impact  fees  for  FY  2022‐23.  It  is recommended  that  increases  to  Parkland  Dedication  and  Transportation Impact  fees  be  deferred  to  allow  for  further  review  of  potential  fee increases.

Schedule C – Planning:  A 1.0% labor cost increase has been applied to all fees in Schedule C,  except  the  Housing  Mitigation  In‐Lieu  fees.  The  Housing  Mitigation  In‐Lieu  fees increase annually (on July 1 of each year) by the Consumer Price Index (CPI) for All Urban Consumers for San Francisco, CA, which is 5.2% for FY 2022‐23.

Zoning, Planning, Municipal Code Fees did not increase because 1.0% of the original fee was less than $0.01 per square foot.

The following change is proposed for Schedule C:
 Parcel Map: Subdivisions, including ministerial subdivisions ‐ up to four (4) parcels (CMC Chapter 18.20).
o The definition of Parcel Map is being modified to add ʺministerial subdivisions.ʺ The addition clarifies staffʹs earlier determination that the process of processing ministerial subdivisions closely matches existing parcel map processes. Therefore, the same fee would apply.

Schedule D – Building: The Building Fee Schedule
contains four tables that have been
numbered to facilitate reference between them. The tables are numbered as follows:

1. Table 1 – Plan Check Fees Only

2. Table 2 – Inspection Fees Only

3. Table 3 – Mechanical, Electrical and Plumbing Fees

4. Table 4 – Miscellaneous Items

Schedule D fees have been increased by a 1.0% labor cost increase. If 1.0% of the original fee was less than $0.50, the fee did not increase since Schedule D fees are rounded to the nearest dollar.

The following fees are proposed additions to Schedule D:

Table 3 – Mechanical, Electrical,
and Plumbing Fees
 Install/Relocate forced air or gravity‐type furnace or burner (including attached ducts and vents) up to and including 100,000 Btu/h (each)
o The  description  is  being  modified  to  remove ʺ or  gravity‐type.ʺ  Gravity‐ type furnaces are no longer used.
 Repair/Alter/Add heating appliance, refrigeration unit, cooling unit, absorption unit, mini‐split system/heat pump, or each heating, cooling, absorption, or evaporative cooling system, including installation of controls and/or ducts. o The description is being modified to change ʺsplit systemʺ to ʺmini‐split system/heat pumpʺ and add ʺand/or ductsʺ for clarification.  Mechanical Permit Fee
o This fee is being added. It was inadvertently left off in the FY 2021‐22 fee schedule.

 Electrical Permit Fee
o This fee is being added. It was inadvertently left off in the FY 2021‐22 fee schedule.
 Plumbing/Gas Permit Fee
o This fee is being added. It was inadvertently left off in the FY 2021‐22 fee schedule.

Table 4 – Miscellaneous Items
 Accessory Dwelling Unit (ADU) ‐ Plan Check Fees
o ʺNon Hillsideʺ is being removed because the fee applies to ADUs in Non‐ Hillside and Hillside areas.
 Accessory Dwelling Unit (ADU) ‐ Inspection Fees
o ʺNon Hillsideʺ is being removed because the fee applies to ADUs in Non‐ Hillside and Hillside areas.
 Cellular/Mobile Phone, alterations to existing facility o This fee is new. Currently, there is no fee for installing antennas on existing pole structures.
 Battery Energy Storage System
o This fee is increasing to align with the standard hourly rate.  Inspections: Courtesy Inspection ‐ 2 hour minimum
o This fee is increasing to align with the inspection hourly rate.  Inspections: Outside of normal business hours (2 hour minimum) o This fee is increasing to align with the inspection hourly rate.  Expedite Plan Review
o This fee is being removed because the City does not offer expedited service.  Plan Review: Overtime Plan Review (2 hour minimum)
o This fee is increasing to align with the plan review hourly rate.  Plan Review: Pre‐Submittal Plan Review (2 hour minimum) o This fee is increasing to align with the plan review hourly rate.

Schedule E – Parks and Recreation:  City staff are proposing the following modifications to the schedule:

 Quinlan Community Center
o Establishment  of  fees  for  the  Craft  Room.  The  roomʹs  capacity  matches Creekside  Park  building  at  50  occupants  maximum,  so  the  fees  are proposed at the same rates.
 Monta Vista Recreation Center/Creekside Park Building/Wilson Park Building o Establishment  of  fees  for  the  Monta  Vista  Kitchen  and  Room  5.  The kitchenʹs capacity most closely matches the Senior Centerʹs Classroom at 30 occupants maximum, so the fees are proposed at those rates. Room 5 most closely matches Creekside Park building, so fees are proposed at that rate.

 Senior Center
o The $7 Flex Pass is being replaced with a Drop‐In Rate to more accurately adjust to the varying costs of classes and programs offered at the Senior Center. This rate is for members to drop into specific fitness classes listed in The 50+ Scene.
 Outdoor Facilities
o The Field Attendant fee amount is increasing from $17 to $18 per hour to align with minimum wage requirements.
o Establishment of picnic area rental fees for Creekside Park. New BBQ pits were  installed,  and  the  picnic  area  capacity  matches  Portal  Park  at  80 occupants maximum, so the fees are proposed at the same rate.  Sports Field Fees
o The sports field fees were updated to incorporate an hourly fee schedule starting  in  FY  2021‐22.  However,  this  shift  to  an  hourly  rate  resulted  in increased costs for permitted field users. To ease this increase, City Council approved  the  proposed  fees  to  be  phased  over  two  years,  established  at 50% in FY 2021‐22 and 100% beginning in FY 2022‐23.
 Park Special Events Permits
o Establishment of fees for the Civic  Center Plaza for festivals and events.

The  plazaʹs  capacity  matches  half  of  Memorial  Park  at  500  or  fewer attendees, so the fees are proposed at the same rate as the ʺhalf of Memorial Parkʺ fee.

Sustainability Impact
None.

Fiscal Impact
Due  to  the  proposed  fee  schedule  increases,  additional  revenues  of  $92,662  in  the General  Fund  and  $158,000  in  the  Enterprise  Funds  are  estimated  in  FY  2022‐23.

Revenues  are  based  on  a  three‐year  historical  average  (FY  2019‐20  to  FY  2021‐22), accounting  for  the  proposed  increases.  If  the  increases  are  not  adopted,  the  cost  of providing the related services will be further subsidized by the General Fund, and the service cost will compete with tax dollars used for City services benefitting the general public. Revenues derived from changes to Schedule E mainly increase Enterprise Funds of the City and not the General Fund.

The recommended increase in fees and estimated revenue are summarized as follows:

Fee Schedule  Additional Revenue  Factor and Basis
Schedule A – General  $4,872  5.2% CPI
Schedule B – Engineering  $17,628  9.8% CCI,

1.0% labor costs
Schedule C – Planning  $9,536  5.2% CPI,

1.0% labor costs
Schedule D – Building  $42,626  1.0% labor costs
Schedule E – Parks &
Recreation
General Fund: $18,000,
Enterprise Funds: $158,000
Primarily market‐
driven

_____________________________________

Prepared by: Thomas Leung, Acting Finance Manager
Reviewed by: Kristina Alfaro, Director of Administrative Services Approved for Submission by:  Jim Throop, City Manager
Attachments:

A – FY 2022‐23 Proposed Fee Schedule A – General (Redline) B – FY 2022‐23 Proposed Fee Schedule B – Engineering (Redline) C – FY 2022‐23 Proposed Fee Schedule C – Planning (Redline) D – FY 2022‐23 Proposed Fee Schedule D – Building (Redline) E – FY 2022‐23 Proposed Fee Schedule E – Parks & Recreation (Redline) F – FY 2022‐23 Proposed Fee Schedule A – General (Clean) G – FY 2022‐23 Proposed Fee Schedule B – Engineering (Clean) H – FY 2022‐23 Proposed Fee Schedule C – Planning (Clean) I – FY 2022‐23 Proposed Fee Schedule D – Building (Clean) J – FY 2022‐23 Proposed Fee Schedule E – Parks & Recreation (Clean) K – User Fee Study 2016
L – Draft Resolution No. 22‐049 approving FY 2022‐23 Fee Schedules A, B, C, D, and E

← All documents from this meeting