Cities Index.
K - Innovation and Technology

Cupertino City Council
May 19, 2022

Document
K - Innovation and Technology
Meeting
May 19, 2022
Body
Cupertino City Council
Original file
351 KB
Text extracted from the city's file for reading and search. Open the original on legistar.granicus.com. That file is the official record.

Innovation and Technology
FY 2022-23 Proposed Budget
Innovation and Technology
257
This page intentionally left blank.

FY 2022-23 Proposed Budget
Innovation and Technology
258
Department Overview
Budget Units
Budget Unit
Program
2023 Proposed Budget
I&T Administration
$ 259,434
610-30-300
Innovation & Technology Administration
$ 259,434
Video
$ 574,604
100-31-305
Video
$ 574,604
100-31-307
Public Access Support
$
-
Applications
$ 2,815,258
100-32-308
Applications
$ 2,815,258
Infrastructure
$ 2,721,957
610-34-310
Infrastructure
$ 2,721,957
GIS
$ 1,546,226
610-35-986
GIS
$ 1,546,226
Total
$ 7,917,479
FY 2022-23 Proposed Budget
Innovation and Technology
259
Budget at a Glance
2023 Proposed Budget
Total Revenues
$ 3,916,540
Total Expenditures
$ 7,917,479
Fund Balance
$ 412,601
General Fund Costs
$ 4,423,540
% Funded by General Fund

55.9%
Total Staffing

13.4 FTE
Organization
Bill Mitchell
, Chief Technology Officer
FY 2022-23 Proposed Budget
Innovation and Technology
260
Performance Measures
Goal: Provide superior delivery of information and technology services to city employees and constituents while continually enhancing levels of engagement.

Benefit: Integrated information services enable customer access to the tools and information they need, when and where they need it.

FY 2022-23 Proposed Budget
Innovation and Technology
261
Performance Measure
FY 2020
July-June
FY 2021
July-June
FY 2022
July-Dec
Ongoing
Target
GIS: % of time spent Developing Application
10%
25%
25%
35%
GIS: % of time Maintaining applications
90%
75%
70%
65%
GIS: Met Requests within SLA (map, data,
Web maps, Cityworks, schema, other)
completed
97%
98%
100%
100%
GIS: Increase Property Information
(Internal/External) site visits per month
665/2,671
691/533
838/575
900/600
GIS: Cityworks utilization - # of assets
Cupertino maintains vs # of assets
maintained in Cityworks. Also the % increase
of work units completed (WOs, INSP,SRs)
45/31
70%
45/31
20%
45/35
50%
45/45
20%
Infrastructure: Percentage based upon
number of scheduled projects/Number of
projects completed on time
80%
86%
71%
100%
Infrastructure: Percentage based upon
number of HelpDesk tickets/SLA
measurements
93%
94%
93%
90%
Infrastructure: % Customer satisfaction based
upon Satisfaction Rate from helpdesk tickets

99.10%

98.70%
100.00%
85%
Infrastructure: % of network uptime (not
including planned maintenance)

99.90%

99.90%
100.00%
99%
Applications: % of citywide-enterprise
application project management performed
on time and on budget
96%
95%
95%
95%
Applications: Number of website site
visits/Number of site hits
1,624,377
800,164
823,496
5% annual
increase
Applications: Number of support request for
the applications support per month
45 65
55 20
FY 2022-23 Proposed Budget
Innovation and Technology
262
Multimedia Division
Performance Measure
FY 2020
July-June
FY 2021
July-June
FY 2022
July-Dec
Ongoing
Target
Percentage of total video productions
performed vs scheduled productions (city
meetings excluded)₁
145%
32/22
522%
47/9
326%
29/8
100%
Percentage of total engineering projects vs
scheduled projects₂
233%
7/3
250%
15/6
300%
6/2
100%
Total video views on YouTube and Granicus
platforms combined*₃
215,607
246,313
83,417
5% annual
increase
* Percentage skewed due to pandemic - more overall views due to daily press conference postings ₁The Multimedia Division is responsible for producing videos for both city staff as well as the general Cupertino public. Typically, dozens of video productions are completed every year. Video productions range in scope from relatively simple 30-second public service announcements to major projects like CREST that require more than two months of on-going field production, post-production editing, and a live awards program telecast. This specific Workload Indicator clearly indicates that a large percentage of annual video projects are unscheduled or unanticipated. The main reason is that video productions are oNentimes evaluated and prioritized on the basis of their immediate organizational value, impact and/or newsworthiness.

Oftentimes, these unanticipated projects are identified and assigned with only a few days or weeks of advanced notice. As such, there is an on-going need within the division for workflow and work schedule adaptability when it comes to evaluating video productions and completing them on time and on budget. The measurements here are tracked in the "milestones" document located in our City Channel documentation folder. The milestones document is a comprehensive dataset of all the video division projects--both large and small--and is maintained by the entire Multimedia Division staff. City meeting telecasts are not included in this particular dataset.
₂Multimedia staff is responsible for designing, managing, and maintaining the many audiovisual and broadcast systems located within the organization. These include systems within the conference and multipurpose rooms, office and huddle spaces, as well as the complex broadcast systems within the video control room at Community Hall. Engineering projects differ from simple repairs, tasks, and modifications in that projects, as defined, require a phased-in approach with advanced planning, design, budgeting, resource acquisition, and implementation. Most engineering projects are scheduled well in advance; occasionally, however, Multimedia Division staff may need to implement unanticipated projects if staff or council priorities require as such. The Workload Indicator here measures the number of projects completed vs. the number of scheduled projects.

These measurements are tracked in the "engineering milestones" document located in our City Channel documentation folder. This document is maintained by Pete Coglianese, who is the broadcast engineer for the division.
₃Multimedia staff historically tracks viewership data within our primary online video platforms--YouTube and Granicus. We continue to see an upward trend in viewership of our videos which are used to promote city meetings, city programs, and city services. Our target is to increase viewership by 5% annually. Both YouTube and Granicus provide advanced reporting modules that allow us to accurately track the number of views over a given date range. The numbers here indicate total views rather than total unique views. Other online platforms were considered as part of this dataset; however, because we do not consistently post videos to our FY 2022-23 Proposed Budget
Innovation and Technology
263
other social media sites such as Facebook, TwiWer, Instagram, and Nextdoor, those statistics were not included as part of this specific performance measure. Similarly, we do have accurate viewership data for the City Channel, our government access television channel, so that platform was excluded as well.

FY 2022-23 Proposed Budget
Innovation and Technology
264
Workload Indicators
Applications Division
Workload Indicator
FY 2020
July-June
FY 2021
July-June
FY 2022
July-Dec
Enterprise Programs Support & Maintenance₁
2,500 hours
1,900 hours
2,000 hours
Application Development₂
1,500 hours
800 hours
750 hours
Percentage of Project Management Performed
on Time and Budget for Citywide
Applications₃
95%
95%
95%
₁The Application division is responsible for supporting enterprise business platforms like ERP, Land Management System, Recreation System, City Digital Records, City Website and many programs like Admin Services digital transformation, citywide permiWing, licensing and enforcement solutions. All these programs and services require constant enhancements, support and maintenance. The related tasks may range from providing staff user access to these platforms to issues that may require intensive programming and configurations to resolve. Troubleshooting existing or building new application configuration rules and parameters based on the current business process or new requirements. Creating custom application workflows in back office enterprise platforms like Accela, and New World to configuring business processes and integrating these enterprise soNware systems. Some issues require working and coordinating with soNware vendors to identify and resolve business workflows and other operational related problems.

Application integrations is a big solution in providing end to end business solutions. Coordinating the scheduling of corrective patches and upgrades between vendors and staff. ₂Applications division creates custom soNware solutions like Bid Management solution and Permit Parking soNware solutions. Application development for these kind of soNware solution goes through all stages of SoNware Development Life Cycle (SDLC) of Requirement-gathering, Analysis, Designing, Coding, Testing and Deployment of these custom soNware solutions. The Application team works with various city department and other key stakeholders during phases of SDLC. Application staff gather business requirements, participate in a variety of system user and work groups to identify user needs and operational, programmatic, and or regulatory changes affecting application requirements and other related issues. Perform soNware application coding, building system integration and interfaces between applications. Perform end user application tests for functionality and usability. Writing test scripts based on business processes. Perform system tests, integration test and performance (volume) tests. ₃This measure involves the task of project research and communications, project charter creation, creating or reviewing statement of work, contractor research and selection process, activity and resource planning, creation of work breakdown structure, team building, time management, deliverable management, customer satisfaction, risk management, communication management, project closeout process and documentation.

FY 2022-23 Proposed Budget
Innovation and Technology
265
Infrastructure Division
Workload Indicator
FY 2020
July-June
FY 2021
July-June
FY 2022
July-Dec
Percentage of helpdesk requests completed 48
hours or less₁
92%
94%
93%
% of network uptime₂

99.9%

99.9%

99.8%
Number of IT Projects Completed₃
100%
3/3
100%
7/7
100%
3/3
₁Infrastructure is responsible for the acquisition, maintenance and support of all computer hardware necessary for the City's leading edge network (server, storage, switch, security, appliance) and end user (PC, tablet, VoIP Devices, Smartphones) services. Exemplary customer service coupled with highly skilled staff is the trademark of this team.
₂Ensuring the City's vast network environment meets Business Continuity and Disaster Recovery requirements is a major responsibility of Infrastructure. Two geographically diverse data centers connected with a high speed Ethernet connection that traverses over 1000 miles provides this much needed service. 24x7 monitoring is done via a plethora of tools and contract services managed by Infrastructure. ₃PC based applications such as MicrosoN Office, Team Collaboration, Adobe, SoNphone, Antivirus, Teleconferencing and many more are procured, configured, maintained and supported. Citywide education of these products as well as end user security is the responsibility of Infrastructure which ensures a skilled City staff that know how to utilize software efficiently and securely.

GIS Division
Workload Indicator
FY 2020
July-June
FY 2021
July-June
FY 2022
July-Dec
Hours Spent Web Application Development₁
460/tracking is still
being refined. This
is not an accurate
account.
540/tracking is still
being refined. This
is not an accurate
account.
450/ tracking is still
being refined. This
is not an accurate
account
Map, Data, Analysis, Report, Application
Configuration Requests, Workflow
Enhancements Completed Requests₂
422/tracking is still
being refined. This
is not an accurate
account.
882/tracking is still
being refined. This
is not an accurate
account.
691/tracking is still
being refined. This
is not an accurate
account.

Number of I&T workplan projects completed₃
100%
11/11
100%
8/8 After budget
reduction
20%
4/20
₁The GIS Division builds web applications for staff to use as a tool in their daily workflows. The web application Property Info is a great example of this. Staff use it to review properties for development - select a property see all the associated layers of data, and access any related laserfiche documents. Property info is the FY 2022-23 Proposed Budget
Innovation and Technology
266
main web mapping application staff use so we are constantly making improvements based on requests or new advancements in web development, or available widgets. We also create a number of web applications for the public hWps://www.cupertino.org/online-services/open-government-data/city-maps/web-maps-and- applications everything from the service finder that give residents a one stop shop of all City services to the CIP story map that give the public a visually appealing way to quickly interpret what capitol improvement projects are scheduled this year, where the project is located, what the project entails, and current status. ₂GIS receives requests from staff and sometimes Commissioners, Sheriffs office, City Council members…These requests range from hard copy maps (ex. Update a zoning designation and print all new zoning maps) to interactive web maps (ex. PW had a consultant evaluate a section of Regnart Rd and Chad asked us to create a web map with the data point locations and associate photos), data request (ex. how many Trees were trimmed this year), Data changes (ex. can I see this layer symbolized by status and added to property info application), crystal report requests (ex. fleet wants a report that shows how many times each vehicle has a repair work order based on a dynamic timeframe), to application modifications (ex. the Tree Division is tasked with mediating a tree virus issue and they would like a new work order type so they can track the problem over time or Planning had us create a layer for private trees and then add it to the Property info application.) Evaluating staff use of an application and implementing ways to streamline that workflow. Reduce the number of steps to performing a task by configuring/coding an application in a way that eliminates redundancies. We are also asked to configure GIS for enterprise applications such as Accela and ActiveNet. ₃Project research and communications, project charter creation, SOW creation, contractor research and selection process, activity & resource planning/work breakdown structure, team building and motivation, time management, deliverable management, ensuring customer satisfaction, risk management, communication management, project closeout process, documentation
Multimedia Division
Workload Indicator
FY 2020
July-June
FY 2021
July-June
FY 2022
July-Dec
Percentage of total video productions
performed vs scheduled productions (city
meetings excluded)₁
145%
32/22
522%
47/9
362%
29/8
Percentage of total engineering projects vs
scheduled projects₂
233%
7/3
250%
15/6
300%
6/2
Total video views on YouTube and Granicus
platforms combined*₃
215,607
246,313
83,417
* Percentage skewed due to pandemic - more overall views due to daily press conference postings ₁The Multimedia Division is responsible for producing videos for both city staff as well as the general Cupertino public. Typically, dozens of video productions are completed every year. Video productions range in scope from relatively simple 30-second public service announcements to major projects like CREST that require more than two months of on-going field production, post-production editing, and a live awards program telecast. This specific Workload Indicator clearly indicates that a large percentage of annual video projects are unscheduled or unanticipated. The main reason is that video productions are oNentimes evaluated and prioritized on the basis of their immediate organizational value, impact and/or newsworthiness.

Oftentimes, these unanticipated projects are identified and assigned with only a few days or weeks of advanced FY 2022-23 Proposed Budget
Innovation and Technology
267
notice. As such, there is an on-going need within the division for workflow and work schedule adaptability when it comes to evaluating video productions and completing them on time and on budget. The measurements here are tracked in the "milestones" document located in our City Channel documentation folder. The milestones document is a comprehensive dataset of all the video division projects--both large and small--and is maintained by the entire video staff. City meeting telecasts are not included in this particular dataset.
₂Multimedia staff is responsible for designing, managing, and maintaining the many audiovisual and broadcast systems located within the organization. These include systems within the conference and multipurpose rooms, office and huddle spaces, as well as the complex broadcast systems within the video control room at Community Hall. Engineering projects differ from simple repairs, tasks, and modifications in that projects, as defined, require a phased-in approach with advanced planning, design, budgeting, resource acquisition, and implementation. Most engineering projects are scheduled well in advance; occasionally, however, video staff may need to implement unanticipated projects if staff or council priorities require as such. The Workload Indicator here measures the number of projects completed vs. the number of scheduled projects. These measurements are tracked in the "engineering milestones" document located in our City Channel documentation folder. This document is maintained by Pete Coglianese, who is the broadcast engineer for the division.
₃Multimedia staff historically tracks viewership data within our primary online video platforms--YouTube and Granicus. We continue to see an upward trend in viewership of our videos which are used to promote city meetings, city programs, and city services. Our target is to increase viewership by 5% annually. Both YouTube and Granicus provide advanced reporting modules that allow us to accurately track the number of views over a given date range. The numbers here indicate total views rather than total unique views. Other online platforms were considered as part of this dataset; however, because we do not consistently post videos to our other social media sites such as Facebook, TwiWer, Instagram, and Nextdoor, those statistics were not included as part of this specific performance measure. Similarly, we do have accurate viewership data for the City Channel, our government access television channel, so that platform was excluded as well.

Proposed Budget
It is recommended that City Council approve a budget of $7,917,479 for the Innovation and Technology department. This represents an increase of $1,651,209 (26.4%) from the FY 2021-22 Adopted Budget.

Increase in Compensation and Benefits are due to a transfer of 1.5 positions from the City Manager's Office.

Increases in Materials, Contract Services and Special Projects are due to multi-year and new infrastructure and application enhancements.

FY 2022-23 Proposed Budget
Innovation and Technology
268
Proposed Expenditures by Division
Department Expenditure History
Revenues and Expenditures

35.6%

34.4%

19.5%

7.3%
Applications
Infrastructure
GIS
Video
I&T Administration
$7.43M
$5.16M
$6.27M
$7.92M
2020 Actual
2021 Actual
2022 Adopted Budget
2023 Proposed Budget
FY 2022-23 Proposed Budget
Innovation and Technology
269
Revenues and Expenditures
The following table details revenues, expenditures, changes in fund balance and General Fund costs by category. It includes actuals for two prior fiscal years, the Adopted Budget for the prior fiscal year, and the Proposed Budget for the current fiscal year.

Category
2020 Actual
2021 Actual
2022 Adopted Budget
2023 Proposed Budget
Revenues
Intergovernmental Revenue
$
-
$ 15,000
$
-
$
-
Charges for Services
$ 2,739,704
$ 3,996,438
$ 4,572,658
$ 3,916,540
Miscellaneous Revenue
$
-
$ 67,130
$
-
$
-
Total Revenues
$ 2,739,704
$ 4,078,568
$ 4,572,658
$ 3,916,540
Expenditures
Employee Compensation
$ 2,193,929
$ 2,028,109
$ 2,072,164
$ 2,434,120
Employee Benefits
$ 1,039,353
$ 729,278
$ 857,214
$ 991,799
Materials
$ 1,611,936
$ 1,385,735
$ 1,716,016
$ 2,416,519
Contract Services
$ 839,759
$ 516,877
$ 523,600
$ 835,469
Cost Allocation
$ 1,437,210
$ 299,745
$ 303,672
$ 299,745
Special Projects
$ 310,676
$ 198,377
$ 721,660
$ 858,528
Contingencies
$
-
$
-
$ 71,944
$ 81,299
Total Expenditures
$ 7,432,863
$ 5,158,121
$ 6,266,270
$ 7,917,479
Fund Balance
$ (1,072,796)
$ (394,967)
$ (745,302)
$ 412,601
General Fund Costs
$ 3,620,365
$ 684,587
$ 948,310
$ 4,423,540
Staffing
The following table lists full-time equivalents (FTE) by position. It includes actuals for two prior fiscal years, the Adopted Budget for the prior fiscal year, and the Proposed Budget for the current fiscal year.

FY 2022-23 Proposed Budget
Innovation and Technology
270
Position Title
2020
Actual
2021
Actual
2022 Adopted
Budget
2023 Proposed
Budget

ADMINISTRATIVE ASSISTANT

0.95 0.95

0.95 0.95

APPLICATIONS MANAGER

1.00 1.00

1.00 1.00

ASSET MANAGEMENT TECHNCIAN

1.00 1.00

1.00 0

BUSINESS SYSTEMS ANALYST

3.00 3.00

3.00 3.00

CHIEF TECHNOLOGY OFFICER

1.00 0.98

0.98 0.98

GIS ANALYST

1.00 1.00

1.00 1.00

GIS MANAGER

1.00 1.00

1.00 1.00

INFRASTRUCTURE MANAGER

1.00 1.00

1.00 1.00
I.T. ASSISTANT

2.00 2.00

2.00 2.00

MANAGEMENT ANALYST
0 0
0 1.00

MULTIMEDIA COMMUNICATIONS
SPEC

3.00 0
0 1.50
Total

14.95 11.93

11.93 13.43
FY 2022-23 Proposed Budget
Innovation and Technology
271
Innovation & Technology Administration
Budget Unit 610-30-300
Information Technology - I&T Administration - Innovation & Technology Administration Budget at a Glance
2023 Proposed Budget
Total Revenues
$
-
Total Expenditures
$ 259,434
Fund Balance
$ (259,434)
General Fund Costs
$
-
% Funded by General Fund

0.0%
Total Staffing

0.5 FTE
Program Overview
The Innovation & Technology Department Administration Division is responsible for the strategic planning, governance, policy seWing, and leadership in the use of digital services for the City. The services include a state of the art network which provides transport for best of class business applications, e.g., financial, land management, recreation, asset management, HR, e-commerce and work order management. Additionally, Administration ensures oversight of budget, tactical plans, succession planning, partnership development (internal/external) and staffing. Procurement and budget monitoring are also responsibilities of Administration.

Service Objectives
Develop a roadmap to effectively leverage existing technology and adopt emerging technology to meet business needs.

Create and sustain a workplace atmosphere that promotes a balance between employee innovation, accountability and business needs.

Ensure two-way communication between and among the City organization and stakeholders.

Improve user experience including ease of use, availability, and accessibility within the context of compliance with industry standards.

Ensure transparent and easy access to City information and services via multiple technologies, e.g. social media, TV, web, and radio.

Proposed Budget
It is recommended that City Council approve a budget of $259,434 for the Innovation & Technology Administration program. This represents a decrease of $10,190 (-3.8%) from the FY 2021-22 Adopted Budget.

The decrease is due to a special one-time project in FY 2021-22.

Special Projects
The following table shows the special projects for the fiscal year.

FY 2022-23 Proposed Budget
Innovation and Technology
272
Project
Appropriation
Revenue
Funding Source
Description
Aclima and
Envirosuite Pilot
Extension
$66,000
$66,000
Internal Service
Fund
FY 2021-22 City
Work Program:

Monitor and report
on Lehigh and
Stevens Creek
Quarries. Includes
noise and pollution
monitoring for these
locations.

Total
$66,000
$66,000
Revenues and Expenditures
The following table details revenues, expenditures, changes in fund balance and General Fund costs by category. It includes actuals for two prior fiscal years, the Adopted Budget for the prior fiscal year, and the Proposed Budget for the current fiscal year.

Category
2020 Actual
2021 Actual
2022 Adopted Budget
2023 Proposed Budget
Revenues
Charges for Services
$ 235,631
$
-
$
-
$
-
Total Revenues
$ 235,631
$
-
$
-
$
-
Expenditures
Employee Compensation
$ 93,426
$ 120,302
$ 115,790
$ 115,790
Employee Benefits
$ 42,452
$ 33,205
$ 49,027
$ 50,019
Materials
$ 11,456
$ 5,178
$ 9,878
$ 11,451
Contract Services
$ 1,440
$ 21,613
$ 15,300
$ 15,500
Cost Allocation
$ 89,236
$
-
$
-
$
-
Special Projects
$
-
$ 140,684
$ 77,500
$ 66,000
Contingencies
$
-
$
-
$ 2,129
$ 674
Total Expenditures
$ 238,010
$ 320,982
$ 269,624
$ 259,434
Fund Balance
$ (2,379)
$ (320,982)
$ (269,624)
$ (259,434)
General Fund Costs
$
-
$
-
$
-
$
-
Staffing
The following table lists full-time equivalents (FTE) by position. It includes actuals for two prior fiscal years, the Adopted Budget for the prior fiscal year, and the Proposed Budget for the current fiscal year.

FY 2022-23 Proposed Budget
Innovation and Technology
273
Position Title
2020 Actual
2021 Actual
2022 Adopted Budget
2023 Proposed Budget

ADMINISTRATIVE ASSISTANT

0.30 0.15

0.15 0.15

CHIEF TECHNOLOGY OFFICER

0.25 0.38

0.38 0.38
Total

0.55 0.53

0.53 0.53
There are no changes to the current level of staffing.

FY 2022-23 Proposed Budget
Innovation and Technology
274
Video
Budget Unit 100-31-305
General Fund - Video - Video
Budget at a Glance
2023 Proposed Budget
Total Revenues
$
-
Total Expenditures
$ 574,604
Fund Balance
$
-
General Fund Costs
$ 584,604
% Funded by General Fund
101.7%
Total Staffing

1.5 FTE
Program Overview
The multimedia budget is being split between the Innovation and Technology Department and the City Manager's Office.

The primary goal of the Multimedia Division is to increase public awareness, interest, understanding, and participation in the issues, programs, and services presented by the City of Cupertino. The staff promotes City services and programs through its 24/7 government access channel, radio station, digital signage network, City website, and numerous online video platforms. In addition, the video staff provides multimedia production services and technical support for all City departments. Multimedia staff also oversees the design, maintenance, and engineering of the City’s broadcast and audiovisual systems.

Service Objectives
Multimedia staff works together to manage and maintain the following city services:

City Channel, the government access television channel which provides 24/7 information to Cupertino residents, includes full coverage of city meetings, community events, town hall forums, press conferences, election coverage, and local speaker series, as well as educational programming and state government affairs programming
Webcasting and video on demand services for live streaming city meetings, events and other programs of interest
Radio Cupertino for emergency and community information for public service announcements, traffic alerts, and weather forecasts
Digital signage to promote city programs and events via electronic displays in city facilities Multimedia production services and maintenance of city video equipment Proposed Budget
It is recommended that City Council approve a budget of $574,604 for the Video program.

FY 2022-23 Proposed Budget
Innovation and Technology
275

1.5 positions and a portion of materials and contracts were transferred from the Multimedia program in Administration to the Video program in Innovation Technology.

In FY 2021-22 the entirety of the budget was in the City Manager's Office and totaled $916,374 (page 252 of the FY 2021-22 Adopted Budget). The current total budget when combining both this budget and the budget in City Manager totals $1,013,396, an increase of $97,022. The increase is due to increases in salary for increased part-time costs and the addition of overtime costs that were missed in last year's adopted budget. In addition, special project costs have increased significantly as well. One-time projects will vary from year to year.

Special Projects
The following table shows the special projects for the fiscal year.

Special project
Appropriation
Revenue
Funding Source
Description
Enhanced
Videoconferencing
System for
Cupertino Room
$35,000
$35,000
General Fund
Videoconferencing
enhancements
Cupertino Room
Lectern Upgrade
$7,500
$7,500
General Fund
Audiovisual grade
lectern replacement
Social Room Audio
Upgrade
$16,500
$16,500
General Fund
Upgrade to the
audio system
Sports Center Audio
System Upgrade
$9,000
$9,000
General Fund
Upgrade to the
audio system
Total
$68,000
$68,000
Revenues and Expenditures
The following table details revenues, expenditures, changes in fund balance and General Fund costs by category. It includes actuals for two prior fiscal years, the Adopted Budget for the prior fiscal year, and the Proposed Budget for the current fiscal year.

FY 2022-23 Proposed Budget
Innovation and Technology
276
Category
2020 Actual
2021 Actual
2022 Adopted Budget
2023 Proposed Budget
Revenues
Charges for Services
$ 8,003
$ 7,204
$
-
$
-
Total Revenues
$ 8,003
$ 7,204
$
-
$
-
Expenditures
Employee Compensation
$ 505,578
$
-
$
-
$ 246,871
Employee Benefits
$ 210,977
$
-
$
-
$ 99,404
Materials
$ 43,830
$ 76
$
-
$ 61,417
Contract Services
$ 77,271
$
-
$
-
$ 95,002
Cost Allocation
$ 280,610
$
-
$
-
$
-
Special Projects
$ 340,362
$
-
$
-
$ 68,000
Contingencies
$
-
$
-
$
-
$ 3,910
Total Expenditures
$ 1,458,628
$ 76
$
-
$ 574,604
Fund Balance
$
-
$
-
$
-
$
-
General Fund Costs
$ 1,450,626
$ (7,128)
$
-
$ 584,604
Staffing
The following table lists full-time equivalents (FTE) by position. It includes actuals for two prior fiscal years, the Adopted Budget for the prior fiscal year, and the Proposed Budget for the current fiscal year.

Position Title
2020
Actual
2021
Actual
2022 Adopted
Budget
2023 Proposed
Budget

ADMINISTRATIVE ASSISTANT

0.10 0
0 0

CHIEF TECHNOLOGY OFFICER

0.15 0
0 0

MULTIMEDIA COMMUNICATIONS
SPEC

3.00 0
0 1.50
Total

3.25 0
0 1.50
There are no changes to the current level of staffing.

FY 2022-23 Proposed Budget
Innovation and Technology
277
Public Access Support
Budget Unit 100-31-307
General Fund - Video - Public Access Support
Budget at a Glance
2023 Proposed Budget
Total Revenues
$
-
Total Expenditures
$
-
Fund Balance
$
-
General Fund Costs
$
-
% Funded by General Fund

0.0%
Total Staffing
FTE
Program Overview
In FY 2020-21, this program was transferred to the City Manager’s Office. A complete discussion of this program can be found under Budget Unit 100-12-307. This program will remain in order to maintain historical data however, once all prior year data as listed in the table below is $0, this program will be removed.

Proposed Budget
There is no budget requested for this program.

Revenues and Expenditures
The following table details revenues, expenditures, changes in fund balance and General Fund costs by category. It includes actuals for two prior fiscal years, the Adopted Budget for the prior fiscal year, and the Proposed Budget for the current fiscal year.

Category
2020 Actual
2021 Actual
2022 Adopted Budget
2023 Proposed Budget
Revenues
Total Revenues
$
-
$
-
$
-
$
-
Expenditures
Contract Services
$ 73,850
$
-
$
-
$
-
Cost Allocation
$ 1,828
$
-
$
-
$
-
Total Expenditures
$ 75,678
$
-
$
-
$
-
Fund Balance
$
-
$
-
$
-
$
-
General Fund Costs
$ 75,678
$
-
$
-
$
-
Staffing
FY 2022-23 Proposed Budget
Innovation and Technology
278
Staffing
There is no staffing associated with this program.

FY 2022-23 Proposed Budget
Innovation and Technology
279
Applications
Budget Unit 100-32-308
General Fund - Applications - Applications
Budget at a Glance
2023 Proposed Budget
Total Revenues
$ 1,431,322
Total Expenditures
$ 2,815,258
Fund Balance
$
-
General Fund Costs
$ 1,383,936
% Funded by General Fund

49.2%
Total Staffing

3.5 FTE
Program Overview
The Applications Division manages business requirements gathering, design, development, procurement, project management, implementation and ongoing maintenance and support of all enterprise-wide business systems and programs. These systems include Financial Enterprise Resource Planning (ERP), Land-use Management System, Recreation Management System and their related customer facing portals. Additionally Applications division is responsible for electronic content management (records retention) system and city’s procurement management system.

The Applications Division manages the City's website, Intranet, and mobile apps development. The division staff supports e-service programs and services like permiWing, licensing and enforcement. Applications division is responsible for creating custom SaaS soNware platforms like bid management solution and residential parking permits solution. They are also responsible for application integrations so critical business data can flow between enterprise platforms. Applications division staff also generate critical business analytics and reports to aid city staff in geWing insight through data visualization and helps department supervisors and managers in decision making and measurements of key performance index and goals.

Service Objectives
Deliver business solutions that meet customer requirements and integrate within the City's application framework.

Assist departments in developing streamlined and effective business processes that are easy to understand and translate into existing and new enterprise applications.

Work closely with City staff and members of the community to ensure that the City's enterprise application platforms are relevant and provide value to all the stakeholders.

Collaborate with various City departments to determine that the City's enterprise soNware solutions meet the functional requirements and long-term application implementation strategy of the organization.

Create and maintain effective online and mobile user access to municipal information and services.

Enable and facilitate the use of communication and technical resources by nontechnical staff and customers.

FY 2022-23 Proposed Budget
Innovation and Technology
280
Generate business data dashboards to city staff and external stakeholders.

Proposed Budget
It is recommended that City Council approve a budget of $2,815,258 for the Applications program. This represents an increase of $445,971 (18.8%) from the FY 2021-22 Adopted Budget.

Increases in Compensation and Benefits are mainly due to increased part-time staff. Increases in Materials, Contract Services, and Special Projects are due to new applications and enhancements to current applications.

Special Projects
The following table shows the special projects for the fiscal year.

Special Project
Appropriation
Revenue
Funding
Source
Description
ERP Phase I
$106,928
$160,928
General
Fund
Needs Analysis
Accela Citizen
Access Guide and
Wrapper
$25,000
$25,000
General
Fund
Update to User Interface
Code Enforcement
Consolidated
Application
$40,000
$40,000
General
Fund
Consolidation of Code
Enforcement system
operations
Climate Action Plan
Implementation
Software
$20,000
$20,000
General
Fund
Climate Action plan
platform
Accela Roadmap
$25,000
$25,000
General
Fund
Develop Systematic
Roadmap
ActiveNet Roadmap
$25,000
$25,000
General
Fund
Develop Systematic
Roadmap
ZenDesk for Parks &
Recreation
$40,000
$40,000
General
Fund
Implement Customer
Service Solution
Semi Annual ADA
Consultant
$35,000
$35,000
General
Fund
City website ADA
Compliance
Crisis Management
Software
$15,000
$15,000
General
Fund
Customization of County
dashboard
Total
$331,928
$331,928
Revenues and Expenditures
The following table details revenues, expenditures, changes in fund balance and General Fund costs by category. It includes actuals for two prior fiscal years, the Adopted Budget for the prior fiscal year, and the Proposed Budget for the current fiscal year.

FY 2022-23 Proposed Budget
Innovation and Technology
281
Category
2020 Actual
2021 Actual
2022 Adopted Budget
2023 Proposed Budget
Revenues
Intergovernmental Revenue
$
-
$ 15,000
$
-
$
-
Charges for Services
$
-
$ 1,307,803
$ 1,613,055
$ 1,431,322
Miscellaneous Revenue
$
-
$ 67,130
$
-
$
-
Total Revenues
$
-
$ 1,389,933
$ 1,613,055
$ 1,431,322
Expenditures
Employee Compensation
$ 471,362
$ 635,662
$ 671,629
$ 722,798
Employee Benefits
$ 153,882
$ 206,339
$ 242,843
$ 254,426
Materials
$ 981,919
$ 749,988
$ 928,372
$ 1,254,233
Contract Services
$ 236,801
$ 186,966
$ 195,400
$ 215,139
Cost Allocation
$ 178,096
$
-
$
-
$
-
Special Projects
$
-
$ 57,693
$ 295,560
$ 331,928
Contingencies
$
-
$
-
$ 35,483
$ 36,734
Total Expenditures
$ 2,022,060
$ 1,836,648
$ 2,369,287
$ 2,815,258
Fund Balance
$
-
$
-
$
-
$
-
General Fund Costs
$ 2,022,061
$ 446,715
$ 756,232
$ 1,383,936
Staffing
The following table lists full-time equivalents (FTE) by position. It includes actuals for two prior fiscal years, the Adopted Budget for the prior fiscal year, and the Proposed Budget for the current fiscal year.

Position Title
2020 Actual
2021 Actual
2022 Adopted Budget
2023 Proposed Budget

ADMINISTRATIVE ASSISTANT

0.15 0.30

0.30 0.30

APPLICATIONS MANAGER

1.00 1.00

1.00 1.00

BUSINESS SYSTEMS ANALYST

2.00 2.00

2.00 2.00

CHIEF TECHNOLOGY OFFICER

0.30 0.20

0.20 0.20
Total

3.45 3.50

3.50 3.50
There are no changes to the current level of staffing.

FY 2022-23 Proposed Budget
Innovation and Technology
282
Infrastructure
Budget Unit 610-34-310
Information Technology - Infrastructure - Infrastructure Budget at a Glance
2023 Proposed Budget
Total Revenues
$ 1,556,269
Total Expenditures
$ 2,721,957
Fund Balance
$ 1,289,312
General Fund Costs
$ 2,455,000
% Funded by General Fund

90.2%
Total Staffing

4.5 FTE
Program Overview
The IT Infrastructure Division is responsible for technology-related expenses for the citywide management of information technology services. The Infrastructure Manager and staff are responsible for computer helpdesk, network availability, and performance, security and compliance, incident response, disaster recovery and business continuity, project management of implementations and upgrades, purchasing and inventory control, technical training, and maintenance of systems. Infrastructure is also tasked with ensuring that the City continues to follow best practices in technology adoption and security practices.

Service Objectives
Provide and continuously improve helpdesk support as this function is oNen the face of IT that staff interacts with on a daily basis.

Maintain standards and procedures for the replacement, support, and maintenance of all City-owned computing devices, printers, networks, peripherals and systems defined by City policy.

Continue innovation and outreach to ensure the City follows best IT practices relating to equipment, policy, and security practices.

Proposed Budget
It is recommended that City Council approve a budget of $2,721,957 for the Infrastructure program. This represents an increase of $519,504 (23.6%) from the FY 2021-22 Adopted Budget.

Increases in Materials, Contract Services, and Special Projects are due to multi-year and new infrastructure and security enhancements.

Special Projects
The following table shows the special projects for the fiscal year.

FY 2022-23 Proposed Budget
Innovation and Technology
283
Special Project
Appropriation
Revenue
Funding Source
Description
City Facilities Camera Capture
Expansion
$60,000
$60,000
Internal Service
Fund
Camera Capture System
City Hall Enterprise Server and
Storage Tech Refresh
$150,000
$150,000
Internal Service
Fund
Server Environment
replacement
Supplemental Wi-Fi Expansion
in Public Areas
$20,500
$20,500
Internal Service
Fund
Internet service to three
parks
Office 365 E5 Licenses
$7,000
$7,000
Internal Service
Fund
Adding 40 developer
Licenses
Proactive Managed Risk and
Security Monitoring
$23,000
$23,000
Internal Service
Fund
Proactive cyber threat
monitoring
Public Bicycle Smart Rack
Docks Technology
Enhancement/Review
$2,000
$2,000
Internal Service
Fund
Public Bicycle Smart Rack
Docks improvements
Sign Shop Printer Warranty
$3,000
$3,000
Internal Service
Fund
Sign Shop Printer
maintenance
CAD&RMS WAN Link
$7,200
$7,200
Internal Service
Fund
secured link for computer
aided dispatch
Digital Signage
$25,000
$25,000
Internal Service
Fund
Pilot digital signage solution
for 1 park
Total
$297,700
$297,700
Revenues and Expenditures
The following table details revenues, expenditures, changes in fund balance and General Fund costs by category. It includes actuals for two prior fiscal years, the Adopted Budget for the prior fiscal year, and the Proposed Budget for the current fiscal year.

FY 2022-23 Proposed Budget
Innovation and Technology
284
Category
2020 Actual
2021 Actual
2022 Adopted Budget
2023 Proposed Budget
Revenues
Charges for Services
$ 1,629,376
$ 1,767,098
$ 1,882,195
$ 1,556,269
Total Revenues
$ 1,629,376
$ 1,767,098
$ 1,882,195
$ 1,556,269
Expenditures
Employee Compensation
$ 605,073
$ 660,555
$ 657,676
$ 683,644
Employee Benefits
$ 353,426
$ 270,305
$ 307,679
$ 314,130
Materials
$ 445,355
$ 470,005
$ 559,969
$ 793,929
Contract Services
$ 303,138
$ 212,752
$ 192,900
$ 305,328
Cost Allocation
$ 701,888
$ 299,745
$ 303,672
$ 299,745
Special Projects
$ (29,686)
$
-
$ 159,400
$ 297,700
Contingencies
$
-
$
-
$ 21,157
$ 27,481
Total Expenditures
$ 2,379,194
$ 1,913,362
$ 2,202,453
$ 2,721,957
Fund Balance
$ (677,818)
$ 98,735
$ (128,180)
$ 1,289,312
General Fund Costs
$ 72,000
$ 245,000
$ 192,078
$ 2,455,000
Staffing
The following table lists full-time equivalents (FTE) by position. It includes actuals for two prior fiscal years, the Adopted Budget for the prior fiscal year, and the Proposed Budget for the current fiscal year.

Position Title
2020 Actual
2021 Actual
2022 Adopted Budget
2023 Proposed Budget

ADMINISTRATIVE ASSISTANT

0.30 0.30

0.30 0.30

BUSINESS SYSTEMS ANALYST

1.00 1.00

1.00 1.00

CHIEF TECHNOLOGY OFFICER

0.20 0.20

0.20 0.20

INFRASTRUCTURE MANAGER

1.00 1.00

1.00 1.00
I.T. ASSISTANT

2.00 2.00

2.00 2.00
Total

4.50 4.50

4.50 4.50
There are no changes to the current level of staffing.

FY 2022-23 Proposed Budget
Innovation and Technology
285
GIS
Budget Unit 610-35-986
Information Technology - GIS - GIS
Budget at a Glance
2023 Proposed Budget
Total Revenues
$ 928,949
Total Expenditures
$ 1,546,226
Fund Balance
$ (617,277)
General Fund Costs
$
-
% Funded by General Fund

0.0%
Total Staffing

3.4 FTE
Program Overview
The Geographic Information Systems (GIS) program captures, manages, analyzes, and displays all forms of geographically referenced information for the City of Cupertino. Through maps, reports, dashboards, and charts we provide ways to view, understand, question, interpret, and visualize, our City in ways that reveal relationships, paWerns, and trends. The GIS Program works to help our staff, citizens, business, and development communities answer questions and solve problems by looking at our data in a way that is quickly understood and easily shared – on a map!
Service Objectives
Cupertino GIS works to provide and support state-of-the-art GIS mapping services and applications in the rapidly evolving and expanding field of geospatial technology.

Create, collect, maintain, and distribute high quality, up-to-date, and complete geospatial data.

Ensure that the City’s GIS systems and data are available for day-to-day City and regional purposes.

Share the City’s GIS data and services as widely as possible.

Raise the awareness of GIS.

Integrate spatial technology into Cupertino’s business processes and applications.

Support emergency planning, response, and recovery.

Proposed Budget
It is recommended that City Council approve a budget of $1,546,226 for the GIS program. This represents an increase of $121,320 (8.5%) from the FY 2021-22 Adopted Budget.

Increases in Materials and Contract Services are due to new applications and enhancements to current applications, this is offset by a decrease in special projects.

Special Projects
The following table shows the special projects for the fiscal year.

FY 2022-23 Proposed Budget
Innovation and Technology
286
Special Project
Appropriation
Revenue
Funding Source
Description
Drone Instructor
$1,600
$1,600
Internal Service
Fund
Required training for Drone
pilots
Additional Telematics
Devices
$5,300
$5,300
Internal Service
Fund
Additional Licenses
LaserFiche Scanning
$30,000
$30,000
Internal Service
Fund
City Document scanning
Additional Amazon ec2
instance (t3aXlarge)
$5,000
$5,000
Internal Service
Fund
Cloud subscription fee
Business Process
Automation
$42,000
$42,000
Internal Service
Fund
Paper form conversion to
digital
Google Query
$5,000
$5,000
Internal Service
Fund
Pilot to retrieve traffic speed
and incident data
Geotab Keyless Solution
$6,000
$6,000
Internal Service
Fund
Keyless storage for fleet keys
Total
$94,900
$94,900
Revenues and Expenditures
The following table details revenues, expenditures, changes in fund balance and General Fund costs by category. It includes actuals for two prior fiscal years, the Adopted Budget for the prior fiscal year, and the Proposed Budget for the current fiscal year.

Category
2020 Actual
2021 Actual
2022 Adopted Budget
2023 Proposed Budget
Revenues
Charges for Services
$ 866,694
$ 914,333
$ 1,077,408
$ 928,949
Total Revenues
$ 866,694
$ 914,333
$ 1,077,408
$ 928,949
Expenditures
Employee Compensation
$ 518,490
$ 611,590
$ 627,069
$ 665,017
Employee Benefits
$ 278,616
$ 219,429
$ 257,665
$ 273,820
Materials
$ 129,376
$ 160,488
$ 217,797
$ 295,489
Contract Services
$ 147,259
$ 95,546
$ 120,000
$ 204,500
Cost Allocation
$ 185,552
$
-
$
-
$
-
Special Projects
$
-
$
-
$ 189,200
$ 94,900
Contingencies
$
-
$
-
$ 13,175
$ 12,500
Total Expenditures
$ 1,259,293
$ 1,087,053
$ 1,424,906
$ 1,546,226
Fund Balance
$ (392,599)
$ (172,720)
$ (347,498)
$ (617,277)
General Fund Costs
$
-
$
-
$
-
$
-
FY 2022-23 Proposed Budget
Innovation and Technology
287
Staffing
The following table lists full-time equivalents (FTE) by position. It includes actuals for two prior fiscal years, the Adopted Budget for the prior fiscal year, and the Proposed Budget for the current fiscal year.

Position Title
2020
Actual
2021
Actual
2022 Adopted
Budget
2023 Proposed
Budget

ADMINISTRATIVE ASSISTANT

0.10 0.20

0.20 0.20

ASSET MANAGEMENT

TECHNCIAN

1.00 1.00

1.00 0

CHIEF TECHNOLOGY OFFICER

0.10 0.20

0.20 0.20

GIS ANALYST

1.00 1.00

1.00 1.00

GIS MANAGER

1.00 1.00

1.00 1.00

MANAGEMENT ANALYST
0 0
0 1.00
Total

3.20 3.40

3.40 3.40
Changes reflect position reclassification of Asset Management Technician to Management Analyst.

FY 2022-23 Proposed Budget
Innovation and Technology
288

← All documents from this meeting