Appendix II, Modification Request Project Description   The Rise SB 35 Development – Modification Request
Project Description
March 24, 2022

Appendix II, Modification Request Project Description   The Rise 1 Table of Contents

1  Introduction                      2
2  Summary of Modification Request                    3 3  Summary of Modification Request Entitlement Amendments               16 4  Residential Affordability and Density Bonus               19

Appendix II, Modification Request Project Description   The Rise 2 1 Introduction
Vallco Property Owner LLC (Applicant) submitted its initial application for the Vallco Town Center Project (Project) pursuant to Government Code section 65913.4 (SB 35) on March 27, 2018 (SB 35 Application), which  was  approved  by  the  City  of  Cupertino  (City)  on  September  21,  2018  (SB 35 Approval).  This modification request application (the modification request) is now being submitted in connection with the approved Project in order to make necessary revisions based on design advancements that are typical of  all  large‐scale  projects.  This  project  description  provides  a  high‐level  summary  of  the  modification request.

Since the 2018 SB 35 Approval, Applicant has made significant progress in readying the Project site for construction  and  bringing  forth  much‐anticipated  transformational  change  to  the  50.82‐acre  former Vallco Mall property. To date, the City has issued certain construction‐related permits for preparation of the  site  including  demolition,  make‐ready  utility,  shoring  and  excavation,  and  foundation  permits.

Meanwhile,  Applicant  has  continued  to  advance  the  Project  design.  The  proposed  design  refinements reflected in this modification request serve to enhance the public realm, improve circulation, better health and safety, and continue to deliver on high quality architecture while keeping intact the original land use program, site plan, general architecture and key community benefits.

The progressed design remains in substantial compliance with the SB 35 Approval and carries forward the same vision for the Project site. However, the City has asserted a narrow interpretation of how close the Project must match the SB 35 Approval,  finding that refinement of design coordination components, such as modest changes to the  size and programming of  the West Plaza, did not meet  SB 35’s “substantial compliance” standard and would require modification to the Tentative Map. With that recent experience in mind, and as we look towards the next stage of construction and development activity, this modification request is being submitted to obtain approval for these Project refinements and to provide a clear path for the building permit review and issuance process moving forward.

As  a  threshold  issue,  this  modification  request  remains  in  compliance  with  SB  35  and  the  objective standards  applicable  to  the  Project.   The  modification  request  remains  consistent  with  the  City’s Community Vision 2040 General Plan (General Plan) vision for redeveloping the aging and outdated indoor mall into a vibrant, sustainable, walkable and safe neighborhood.  Specifically, this modification request retains the key hallmark features of the approved Project:
● 2,402 units of critically needed housing, 50% of which will remain affordable to low‐ and very‐low income residents;
● Robust open space and bicycle and pedestrian connectivity; ● A vibrant mixed‐use “town center” design with residential, retail, entertainment, and office uses in  a  pedestrian‐friendly,  grid  street  network  with  high‐quality  architecture  that  serves  as  a community gateway for the City of Cupertino; and
● Sustainable design  that reduces heat‐island effect; optimizes energy efficiency across program types;  implements  significant  water  conservation,  reclamation,  and  recycling;  enhances  the quality and wellness of indoor environments for all occupants; and replaces an obsolete indoor mall with 40 acres of naturally landscaped open space.

Importantly, this modification request also reflects design updates due to the changed realities learned from the COVID‐19 public health crisis, which has fundamentally impacted the way in which Cupertino and Bay Area residents live, work and  play.   To that end,  key Project updates within  this  modification request include increased access to communal and private outdoor space; residential design and vehicle Appendix II, Modification Request Project Description   The Rise 3 parking  changes  as  a  result  of  work‐from‐home  realities;  increased  outdoor  dining  and  outdoor programming  opportunities;  and  adjustments  to  the  design  of  indoor  spaces  (for  example,  increased ceiling heights and access to natural light) to improve environmental quality and wellness throughout the Project.   Additional  Project  updates  within  this  modification  request  reflect  community  feedback, including  a  revised  unit‐type  mix  that  now  includes  two‐  and  three‐bedroom  affordable  units  and  the removal of the residential amenity uses on the Wolfe Road bridge.   Additional detail regarding design updates is provided in Section 2.4 below.

SB  35  allows  for  applicants  to  request  modifications  to  previously  approved  developments  through  a ministerial modification process set forth under Gov Code § 65913.4(g).  SB 35 establishes that the local government must approve that modification request if it does not affect the City’s prior determinations regarding  the  Project’s  consistency  with  the  objective  planning  standards  in  effect  at  the  time  of  the original SB 35 application.  As described by the statute, the City’s role is “strictly limited” to determining consistency  with  objective  planning  standards,  a  determination  it  must  make  within  60  days  after submission  of  the  modification  where  design  review  does  not  apply,  as  is  the  case  here1. (§ 65913.4(g)(2)2.)   Applicant  is  committed  to  supporting  the  City  with  its  review  of  this  modification request and looks forward to a collaborative process over the next 60 days. 2 Summary of Modification Request

2.1 Key Project Elements and Land Use Program Remain Unchanged The modification request does not impact the key Project features and land use program as approved under the 2018 SB 35 Approval.  Consistent with the General Plan vision in effect at the time of the SB 35 Application  submittal,  including  the  Vallco  Shopping  District  Special  Area,  the  Project  will  continue  to implement strategies to revitalize the aging and outdated indoor mall into a vibrant, sustainable, walkable and safe “town center” neighborhood.

The Project continues to incorporate the following key components and design approaches:
▪ Total  2,402  Residential  Unit  Count  and  50%  Affordability:   2,402  units  of  high‐quality housing,  50%  of  which  will  remain  affordable  to  low‐  and  very‐low  income,  making  a substantial impact in addressing the worsening housing and affordability crisis; ▪ Mixed‐Use Town Center Design:   Vibrant mixed‐use “town center” design with residential, retail, entertainment, office, and open space uses in a pedestrian‐friendly, grid street network with world‐class architecture that serves as a community gateway; ▪ Traditional  Neighborhood  Layout:   Site  plan  that  connects  the  community  (internally  and externally)  via  walkable,  pedestrian‐  and  bike‐friendly  streets,  squares/plazas,  trails,  and pathways;
▪ Open Space and Bicycle and Pedestrian Connectivity: Robust open space program, including significant  ground  level  and  rooftop  open  space  that  will  feature  a  diverse  set  of programmatic  uses,  including  event  and  community  gathering  spaces,  recreational  lawns, playgrounds, trails, and acres of natural landscape; and ▪ Sustainable  Design:  Over  26  acres  of  programmed  open  space;  1,271  new,  relocated  and retained trees; and extensive natural, drought tolerant landscape and green roofs will replace

1 The City's June 22, 2018 letter determining that the Project is eligible for streamlining under SB 35 confirmed that there are no applicable "objective design review standards." 2 Unless otherwise stated, all references are to the California Government Code.

Appendix II, Modification Request Project Description   The Rise 4 the 50‐acre hardscape of Vallco Mall to create a sustainable, climate responsive project with an unprecedented connection to nature in the heart of Silicon Valley.

2.2 Modification Request Land Use Program Summary
The modification request includes refinements to the Project land use program, while maintaining the general mixed‐use design approach and compliance with the two‐thirds residential requirement under SB

35. The  SB 35 Application provided a  comprehensive overview of the Project  design features, most of which remain intact under this modification request.  This Section 2.2 provides an overview of the land use  program  set  forth  under  the  modification  request.  Section  2.4  below  provides  additional  details regarding notable design and program features to assist the City’s review of the modification request.

Additional detailed information regarding  design  updates and the  modification request project data is provided in Appendix III, Modification Request Plan Sets, Sheets P‐0101 and P‐0102.

Table 1: Land Use Program Summary provides a comparative summary of the Project land use program as approved  under the 2018 SB 35 Approval and the modification request.    As shown in Table 1, the modification request results in a Project‐wide change in square footage of only 1.25% as compared with the 2018 SB 35 Approval.  Notably, the growth of the residential component is responsible for all of the increase in project square footage.

The residential area expansion was driven by an increase in unit area, notably including an approximate 10% increase in BMR unit area, which was implemented in response to community requests for more housing  opportunities  for  low  income  families  (though  there  presently  is  unmet  demand  for  all  low‐ income housing types in Cupertino).  Wellness and lifestyle changes as a result of COVID‐19 have guided the majority of the other land use area changes.

The Project’s residential units continue to allow for both rental and for‐sale tenures, and support a wide variety of household types. Of the Project’s 2,402 residential units, 1,201 units (50% total units) remain affordable to low income households making less than 80% area median income (AMI) and 50% AMI in accordance with applicable SB 35, state Density Bonus Law, and local affordable housing requirements.

Appendix II, Modification Request Project Description   The Rise 5 Table 1:  Land Use Program Summary – Modification Request & Comparison to SB 35 Approval1 2018 SB 35 Approval  Modification Request
Land Use  Amount1  % Project  Amount1  % Project
Residential Dwelling
Units
2,402 units  N/A  2,402 units  N/A
Residential Uses
(sq. ft.)
4,961,904 sq. ft.  66.8 %  5,119,005 sq. ft.  68.1%
Office (sq. ft.)  1,981,447 sq. ft.  26.7 %  1,973,494 sq. ft.  26.2% Retail /
Entertainment (sq.
ft.)2
485,912 sq. ft.  6.5 %  429,408 sq. ft.  5.7 %
Total Square
footage3
7,429,263 sq. ft.  100 %  7,521,907 sq. ft.  100 %
Percent Change3  N/A
Unit Count: 0% change
Square footage:  1.25%
Notes:

1. Calculations provided in this Table 1 are based on the Cupertino Municipal Code 19.08.030 “floor area” methodology as utilized in the SB 35 Approval.

2.  The Entertainment component will be no more than 30% the total retail area in compliance with the City of Cupertino’s General Plan.

3.  Pursuant to SB 35, underground space shall not be included for purposes of calculating either (i) the two‐thirds residential requirement or (ii) the square footage of construction changes for modifications. (See § 65913.4(a)(2)(C); see also § 65913.4(g)(3)(A)‐(B).) Therefore, consistent with statutory requirements, this Table 1 summarizes only at‐ and above‐grade square footages.

2.3 Two‐Thirds Residential Compliance
As shown in Table 1: Land Use Program Summary, the modification request remains in compliance with the SB 35 requirement that “at least two‐thirds of the square footage of the development is designated for  residential  use.”   SB  35  establishes  additional  parameters  for  the  calculation  of  the  two‐thirds requirement: (1) the square footage of the development shall not include underground space, such as basements or underground parking garages; and (2) any additional density, floor area, and units, and any other concession, incentive, or waiver of development standards granted pursuant to the Density Bonus Law shall be included in the square footage calculation. (§ 65913.4(a)(2)(C).) As  described  in  the  City’s  June  22,  2018  letter  (“90‐Day  Letter”),  in  evaluating  the  original  SB  35 Application, the City utilized the definition of “floor area” as defined  in  the Cupertino Municipal Code Section  19.08.030(F)  to  determine  what  percentage  of  the  proposed  development  is  designated  for residential  use.  In  its  90‐Day  Letter,  the  City  confirmed  that  the  original  SB  35  Application  materials appropriately designated the residential and non‐residential floor areas for purposes of calculating the two‐thirds  requirement.  This  approach  was  also  upheld  as  proper  by  the  Santa  Clara  County  Superior Court.

This modification request utilizes the same approach as in the original SB 35 Application for calculating the two‐thirds requirement, as shown in Appendix III, Modification Request Plan Sets, Sheets P‐0101 and P‐0106 through 0108. This approach is consistent with the SB 35 requirement that, when processing a modification application, the City must utilize the same “assumptions and analytical methodology” that it Appendix II, Modification Request Project Description   The Rise 6 used when processing the original application to assess consistency with objective planning standards. (§ 65913.4(g)(1)(C).)

2.3.1 Updated HCD Guidelines Methodology Regarding Two‐Thirds Residential Compliance Since the SB 35 Approval, the City has adopted procedures for implementing SB 35 project applications, including its SB 35 Eligibility Checklist and related SB 35 Application Form. The City now utilizes an updated approach to calculating the two‐thirds residential requirement that is no longer based on the “floor area” definition described above, and instead utilizes a revised approach based on the HCD Guidelines. (See Updated  HCD  Guidelines  §400(c)(1).)  The  Updated  HCD  Guidelines  establish  that  the  two‐thirds calculation  is  based  upon  the  “proportion  of  gross  square  footage  of  residential  space  and  related facilities3 as defined in Section 102(w), to gross development building square footage for an unrelated use such  as  commercial,”  and  that  structures  used  for  both  residential  and  nonresidential  uses  “shall  be credited proportionally to each intended use.” (Id.) The primary differences between the original “floor area” approach utilized in the 2018 SB 35 Approval and this new HCD Guidelines methodology is that, under the new methodology, (i) certain square footage is allocated proportionally and (ii) some common areas that are not “substantially enclosed,” such as residential balconies, are included.

While utilizing this revised approach would be appropriate for new SB 35 applications, it is inapplicable to this modification request because the statute requires that the City utilize the same “assumptions and analytical  methodology”  used  for  the  original  SB  35  Application.  Therefore,  using  the  2018  “analytical methodology,” the City must use the Municipal Code “floor area” definition and must exclude the same types of spaces that were previously excluded. Moreover, pursuant to SB 35, any updated HCD Guidelines adopted  or  amended  after  the  Project  approval  “shall  not  be  used  as  a  basis  to  deny  proposed modifications.”  (§ 65913.4(g)(1)(D).)  Therefore,  the  fact  that  the  HCD  Guidelines  adopted  an  updated approach is not a basis for deviating from the original methodology.

Nevertheless,  the  modification  request  remains  in  compliance  with  the  Updated  HCD  Guidelines  two‐ thirds residential methodology as demonstrated in Attachment A: Two‐Thirds Analysis Per Updated HCD Guidelines (Informational Only), which includes analysis – for informational purposes only – regarding the modification request square footage allocations based on the Updated HCD Guidelines methodology.

2.4  Modification Request Design Changes

2.4.1 Land Use Program
As  described  above,  the  overall  Town  Center‐based  land  use  program  remains  the  same.  Each  of  the eleven major blocks comprising the Project site retains the general mix of land uses as set forth in the SB 35 Approval (i.e., Block 1 remains dedicated to residential and retail uses; Block 6 remains dedicated to office  use,  etc.).   For  reference,  Figure  1:   Project  Site  Diagram  provides  a  simplified  overview  of  the Project site layout and block numbering.

3 The term “related facilities” is defined to mean “any manager’s units and any and all common area spaces that are included within the physical boundaries of the housing development, including, but not limited to, common area space, walkways, balconies, patios, clubhouse space, meeting rooms, laundry facilities, and parking areas that are exclusively available to residential users, except any portions of the overall development that are specifically commercial space.”  Updated HCD Guidelines § 102(w)
Appendix II, Modification Request Project Description   The Rise 7 Figure 1:  Project Site Diagram
In  certain  areas,  the  specific  locations  of  land  uses  have  shifted  within  particular  blocks.  For  example, within  Blocks  4  and  5,  townhome  units  have  been  replaced  with  street  fronting  retail  uses  (shifting residential area to, and intensifying residential use at, the upper levels, including those above the green roof). Retail  has also been added in  the plazas: while the East  Plaza’s pavilion was removed, two new pavilions were added to the West Plaza. Furthermore, in response to community concern over the private residential amenity enclosed within the bridge over Wolfe Road, the modification request includes the removal of this structure and replaces it with a turfed play field providing a new area of open space and enhancing connectivity across the green roof. The displaced residential amenity has been distributed to the various residential blocks in the project, which also serves to improve access thereto by residents.

As a result, the modification request includes certain adjustments to the gross square footage of office, retail,  and  residential  land  uses,  as  set  forth  in  Table  1  above.   Under  the  modification  request,  gross square footage allocations are as follows:
▪ Residential: 5,119,005 square feet of residential areas, including 2,402 residential units, 50% of which will be income‐restricted affordable units, which remains within with the General Plan  maximum  residential  density  for  Vallco  Shopping  District  Special  Area  of  35  units  per acre, including the 35% density bonus;4
▪ Office:  1,973,494  square  feet  of  office  space,  which  remains  within  the  General  Plan maximum office allocation of 2,000,000 square feet (see footnote #5 below); and ▪ Retail:   429,408  square  feet  of  retail  space,  consistent  with  the  retail  area  minimum  of 400,000  square  feet  approved  per  the  density  bonus  concessions  included  in  the  SB  35 Approval, which remains applicable to this modification request.

Additional  details  regarding  the  land  use  program  distribution  is  shown  in  Appendix  III,  Modification Request Plan Sets, Sheets P‐0101, and P‐0106 through P‐0108.

4 It should be noted that due to amendments to the State Density Bonus Law, the Project qualifies for a 50% density bonus, which would allow 2,669 units.  However, the present modification request does not propose a change to the unit count.

Appendix II, Modification Request Project Description   The Rise 8 2.4.1.1 Residential Unit Mix, Layouts and Distribution As described above, the overall unit mix count remains unchanged at 2,402 total residential units with 1,201 offered at market rate and 1,201 at income‐restricted affordable levels.

The modification request includes certain changes to the unit mix for both market‐rate and affordable unit types.   Under the SB 35 Approval, the affordable units were designed primarily as studios, with no multi‐bedroom layouts; the modification request now includes 103 affordable units as larger 2‐ and 3‐ bedroom unit types, as well as over 230 additional 1‐bedroom units by converting affordable studios to larger units.  This change will enable more low‐income families to live and work in Cupertino, resulting in greater equity and benefiting the community in many ways.

Additionally, unit layout design throughout the Project has been informed by market changes from the COVID‐19 pandemic and refined to accommodate work‐from‐home configurations and offer improved access to outdoor spaces and amenities.

The distribution of residential units has also shifted within the Project site in an effort to improve project quality and constructability and optimize unit layouts for livability and quality of life, including prioritizing:
sun  exposure,  access  to  outdoors,  and  flexible  work‐from‐home  configurations,  while  also  optimizing constructability of residences in a market where construction costs continue to escalate.   The unit mix was altered to adjust for the increased unit areas due to the additional multi‐bedroom affordable units and residential market changes. Additional information regarding the modification unit mix allocation and residential  program  distribution  is  further  described  in  Appendix  III,  Modification  Request  Plan  Sets, Sheets P‐0102.

2.4.1.2 Office Use
The modification request involves a modest reduction in the office square footage to 1,973,494 SF, which remains within the 2 million square foot cap established under the General Plan5; the office distribution remains located in Blocks 6, 7, 8 and 11.

The modification request also includes certain changes to the layouts of the office buildings within Blocks 6, 7, 8 and 11.  The office area has been redistributed between Blocks 6, 7, 8 and 11 to meet post‐COVID market requirements and the evolving types of office users in the Bay Area. Blocks 6, 7 and 8 have been standardized  to  a  similar  size  to  accommodate  and  appeal  to  multi‐tenant,  single  tenant  and  multi‐ building  campus  users  alike.  The  floorplates  of  these  buildings  have  also  been  optimized  to  meet requirements of office, R&D, and life science users. The office entrances have been revised to coordinate with  the  Project  site’s  sloped  grading  and  are  located  to  account  for  anticipated  future  office  tenant preferences.  Overall,  typical  floor  to  floor  heights  have  been  reduced  from  approximately  17’‐8”  to approximately 15’‐2” (resulting in typical floor to ceiling heights of  14’‐5”).  As described in Section 2.4.3.5 below, major mechanical, electrical and plumbing infrastructure has been relocated to the ground floor, which  has  allowed  for  improved  loading  and  service  functions  to  be  located  at‐grade  rather  than  in

5 This is a conservative approach because this square footage is based on the “floor area” definition, but the City’s approach to office allocation is to exclude “amenity” space because such space does not generate additional vehicle trips. For example, the City excluded several categories of space from Apple Park, including the restaurant, entries, security receptions, wider hallways, among other areas.  The Project includes several similar features, but they are not accounted for in this project description (nor are they deducted from the Project’s floor area).

Appendix II, Modification Request Project Description   The Rise 9 basement levels.   As a result, new loading docks have been provided for each building from the Wolfe Road Frontage Road along Blocks 6, 7, and 8.

As the City previously confirmed  that life science is  an allowed  use for the Project, Block  11 has been reconfigured to accommodate life science tenants, including the potential for laboratory fit‐outs and with the  design  and  operational  criteria  required  for  life  science  uses,  including  appropriate  loading  and staging, clear heights, floor loads and MEP criteria, among other features.  The prospect of life sciences at the Project would be of significant benefit to the City given market demand for this use, the job and fiscal diversity life science uses would introduce to Cupertino, along with the comparatively lower employee density and resulting lower traffic volume impacts as compared to traditional office uses.

2.4.1.3 Retail Use
The  modification  request  retains  a  comparable  amount  of  retail  square  footage  of  429,408  SF,  which remains consistent with the retail area minimum of 400,000 square feet approved per the density bonus concessions included in the SB 35 Approval; retail uses remain located throughout Blocks 1 through 5. The modification request includes certain changes to the location, configuration and layouts of the retail uses throughout the Project site to improve retail siting and create more robust retail environments, as well as to  account  for  required  circulation,  services  and  structural  components,  which  impact  retail  area.  For example, Block 1 retail depths were decreased by at least one structural bay in order to accommodate a rear loading area and enhance leaseability given the market demand for storefront‐oriented street retail, as opposed to urban big box retail format.

With that same goal in mind, retail space has been extended along Street 7 to enhance the retail and shopping environment. Similarly, within Blocks 4 and 5, retail uses have been expanded in that location, with the townhome units previously in those locations relocated elsewhere, and a pedestrian‐only paseo has been added at the ground floor in Block 4 to facilitate connectivity and create a unique retail and dining atmosphere. Finally, sidewalks have been increased in depth throughout the Project site to provide for expanded outdoor dining opportunities to meet newly intensified demand, provide opportunities for the community to enjoy Cupertino’s temperate climate, and create an improved pedestrian experience.

Collectively, these changes will further the City and community’s vision for an unparalleled retail, dining, and  entertainment  destination  that  will  become  the  social  heart  of  Silicon  Valley  and  ensure  that  the vibrancy and urban energy once offered by the former Vallco Mall is restored.

2.4.2 Open Space
The modification request maintains the Project’s commitment to providing an inspired open space design that connects the community with miles of trails and acres of natural landscape, recreational lawns, play areas and community  gathering spaces in a City that is built‐out with few remaining opportunities for these important features, much less additional future parks such as what this Project provides. Built and natural  environments  complement  one  another  to  create  thriving  communities.  The  pandemic  has demonstrated that open space and parks are not just an amenity but are instead a necessity for basic human health and wellness.

The  City,  through  its  General  Plan  and  Parks  &  Recreation  System  Master  Plan,  has  identified  eastern Cupertino, i.e., where the Project site is located, as an area with limited existing parks and an area where the City should focus new parks. However, given the limited availability of land to be made into new open space and parks, the primary strategy for achieving this goal is through incorporation of onsite open space within private developments such as the Project. The Project provides an innovative solution to address Appendix II, Modification Request Project Description   The Rise 10 the need for a natural environment in this region of the City with inadequate existing open space or parks by providing acres of open space intended for community gathering, play areas, and pedestrian/bicycle trails.

The modification request includes certain limited changes to the configurations and layouts of the Project open space to accommodate the other design refinements described herein while maintaining over 26 acres of programmed open space throughout the Project, including meeting the requirements for private park credit under the Cupertino Municipal Code.

West Perimeter Park
The West Perimeter Park combines existing park spaces from the SB 35 approval into a programmed 3.79 acre park at the western edge of Block 1 on the west side of the Project site. (For reference, the West Perimeter Park is comparable in size to the City’s Portal Park.) The West Perimeter Park includes children’s play  areas,  family  picnic  areas,  recreational  lawns,  accessible  pedestrian  paths  and  an  informal amphitheater that will provide a unique programmed park for the community. The West Perimeter Park begins at‐grade on Stevens Creek Boulevard and Perimeter Road and maintains accessible routes as it slopes up.   Because portions of the West Perimeter Park slope upwards, a new elevator has also been added to the north end of Block 1 to provide additional improved access to the topmost portions of the West Perimeter Park.

Town Center Plazas
The modification request retains the “town center” design centered around two outdoor plaza areas – the  West  and  East  Plazas  –  which  will  provide  transformational  placemaking  for  the  Project  site  and surrounding area. The modification request includes limited changes to the design and configuration of the West and East Plazas.

The dimensions of the West Plaza have been reduced by approximately 0.14 acres from 1.26 acres to 1.12 acres in order to increase the area of the sidewalks immediately adjacent to the West Plaza at Blocks 2 and  3,  which  will  provide  an  expanded  and  improved  outdoor  dining  opportunities  to  meet  newly intensified demand as described above and a more vibrant setting. Within the West Plaza, design and program elements have evolved in terms of landscape planting, seating, and retail pavilions to support the activation of the plaza and create the dynamic destination envisioned for the community in the SB 35 approval. The West Plaza will include three retail pavilions (increased from one), which will create more intimate dining and retail opportunities while activating the plaza throughout the day. Additionally, two public access points have been added from the below grade parking to the plaza to facilitate pedestrian circulation and provide convenient entrance points.

The dimensions of the East Plaza have been increased from 0.74 acres to 1.88 acres. This increased size is achieved through incorporation and programming of the pedestrian‐only areas adjacent to the East Plaza and between Blocks 9, 10 and 11.   Specifically, the East Plaza has been reconfigured to limit vehicular
travel around the plaza and to create a more pedestrian friendly setting, with pedestrian/bicycle paths, seating  and  landscaped  plantings.  The  single  retail  pavilion  has  been  removed,  along  with  the escalator/elevator bank, in order to maximize the usable East Plaza area. Dedicating all of the below‐grade parking to the office use allowed for the removal of the central escalator/elevator bank, improving garage layout efficiency,  strengthening the individual connections between the garage and each office building.

Appendix II, Modification Request Project Description   The Rise 11 Pedestrian and Bicycle Trails
The Project continues to incorporate a vast network of trails, including a pedestrian and Class I bikeway along  Perimeter  Road  with  potential  connection  to  future  City  trails,  to  allow  residents,  workers  and commuters alternatives to single‐occupancy vehicles. The Class I bikeway follows the perimeter of the site and will increase the City’s existing Class I bikeway mileage by approximately 15%. Protected Class IV bike lanes are incorporated in the design at Wolfe and Stevens Creek. Class II and III paths connect the internal project street grid. This bikeway network will provide much needed safe bike routes in what currently is one of the City’s highest stress biking areas. Pedestrian trails and sidewalks are provided throughout the project on both the ground level and on the rooftop.

Green Roof Feature
Between the opportunity to master plan a 51‐acre site and Applicant’s commitment to a development of the utmost quality and benefit, the Project continues to provide the largest green roof in the world.  With this modification, the Project will deliver robust rooftop open space featuring a range of active and passive programming,  including:  a  turfed  playfield  area;  game,  fitness,  and  sport  court  areas;  picnic  areas; swimming  pools;  and  natural  landscaping.  The  modification  request  makes  certain  refinements  to  the programming of the green roof area. Notably, the outdoor residential amenity area previously located above Block 5 has been relocated to the bridge located between Blocks 4 and 5. The pedestrian bridge diagonally crossing the West Plaza has been removed.  As noted above, the bridge crossing Wolfe Road also  has  been  reconfigured  to  remove  the  residential  amenity  space  and  has  been  replaced  with  a protected outdoor turfed playfield.

The  Applicant’s  vision  for  the  green  roof  has  always  been  for  it  to  be  a  well‐used  place–by  residents, workers,  and  visitors–and  that  its  best  use  is,  consistent  with  its  urban  setting,  as  an  active  outdoor environment. This modification takes additional steps to ensure the activation of the green roof, including:
introducing office use and adding more housing units at the green roof level; creating additional means of access to the green roof, specifically elevator service at the West Plaza providing general access to the West Perimeter Park as well as additional residential common area access points; and creation of a gentler and more walkable slope along with the refinement of the trail and pathway design.

Project Open Space Programming and Operations
As  described  below,  because  the  City  has  elected  not  to  provide  park  fee  credit  for  a  public  access easement dedication that had been offered over the open space areas, including the plazas, the Tentative Map  is  being  amended  to  remove  this  easement.   Given  Applicant’s  interest  in  providing  a  parkland solution for the park‐deficient  east side of Cupertino, these areas will  continue to  provide  community gathering spaces, connectivity, and opportunities for community events, but with more flexibility for the Owner  to  develop  appropriate  rules  and  regulations  related  to  security,  use,  hours  of  operation  and conduct and to make necessary operational and/or design changes over time. The public access easement – and the property rights such an easement would afford the public – could be restored if the City agrees to  provide  park  fee  credit  as  originally  envisioned  (and  consistent  with  City  policy  to  require  park dedication rather than in‐lieu fees).

2.4.3 Building Bulk, Setbacks, and Height
The General Plan requires the Project to create a vibrant, mixed‐use town center with residential, retail, office  and  open  space  uses.  The  modification  design  maintains  the  basic  programming  of  the  SB  35 approval with some adjustments to building bulk and height to accommodate market driven changes to Appendix II, Modification Request Project Description   The Rise 12 residential and commercial uses, in part due to design changes that respond to COVID‐19.  The peak height of the project (which is reached at the Block 9 and 10 tower elements) remains effectively unchanged from the SB 35 approval (the height of Blocks 9 and 10 as measured from NAVD‐88 increased by 6 inches).

However, under the modification request, some heights and bulks of other structures have increased, as shown  in  the  Appendix  III,  Modification  Request  Plan  Sets  In  some  areas,  floors  have  been  added  to accommodate the increase in residential unit area and redistribution of residential amenity space. Given the constraints of the site and General Plan requirements, the only way to accommodate this additional area is to increase building bulk. Floor to floor heights for all uses have been adjusted to meet prevailing market expectations for indoor design quality and access to natural light.

Countering these changes to building bulk and heights, the peak of the green roof surface has generally been lowered by approximately 9 feet on the west side and approximately 20 feet on the east side, and while the green roof’s surface or edges are not a part of the primary building bulk, the lowering of this architectural feature may also contribute to an enhanced visual connection from the ground level with the green roof and a reduction in the overall perception of the height of the buildings adjacent to it from Stevens Creek Boulevard, Wolfe Road, Vallco Parkway, and neighboring properties. The updated rooftop design provides for more accessible and gradually sloping paths and spaces on the roof.

The Project is sensitive to its neighbors and these changes were made with the utmost consideration. In addition to lowering the main green roof plane, setbacks have been utilized to minimize the perceived building  height  from  streets  and  neighboring  properties.  Upper  floors  are  substantially  setback  at  the green roof level by at least 25’ (and in most locations, 40’) and continue to be further setback on higher floors to minimize perceived bulk and height.

The design changes remain in compliance with the General Plan requirement to maintain the “primary building  bulk” below  the  1:1 set‐back  plane from the arterial/boulevard curb line; no other applicable development standards apply to the Project’s height or bulk.  Although the term “primary building bulk” is not defined in the General Plan, its plain meaning would allow some features to exceed the setback.

The word “primary” suggests that “secondary” or “non‐primary” portions, such as architectural features, may  exceed  the  setback  plane  and  “bulk”  suggests  the  primary  massing.  This  interpretation  is  also consistent with recent City practice.6   See Appendix IV, Updated Objective Standards Consistency Analysis for  additional  information  regarding  the  modification  request  compliance  with  applicable  objective standards.

These changes to the project’s heights, setbacks and bulk will serve to improve the ground floor retail offering, enable the expansion of the affordable units, maximize the placement of residential units above the  green  roof,  provide  improved  outdoor  access  to  residents  and  employees,  and  deliver  a  more activated rooftop open space experience.

2.4.3.1 Vehicular Circulation
The Project’s overall vehicular circulation plan remains the same, including maintaining the major egress and  ingress  along  Wolfe  Road,  Stevens  Creek  Boulevard  and  Vallco  Parkway  and  centering  internal vehicular circulation within the Project site around an internal small block‐street network, which has been designed  consistent  with  the  City’s  “complete  streets”  General  Plan  Policies  M‐2  and  M‐2.2.   The modification request includes minor changes to the Project vehicular circulation and mobility features.

6 For example, recent City staff reports for the Westport project excluded the roof overhang when depicting the location of the “primary building bulk.”
Appendix II, Modification Request Project Description   The Rise 13 Project Ingress and Egress
A  new  central  entry  ramp  has  been  incorporated  at  the  Vallco  Parkway  and  Wolfe  Road  intersection (entering the west‐side below grade garage and arriving at a new rideshare hub and visitor services facility described  below),  which  improves  arrival  efficiency,  reduces  traffic,  and  promotes  a  safer  pedestrian environment throughout the Project. Three additional non‐residential parking entrances have been added to the perimeter of the Project at Blocks 4 and 5 along Wolfe Road and at Block 6 along Street C, and the Perimeter Road ramp at Stevens Creek Boulevard has been modified to coordinate with the progression of the basement parking layout; taken together, these changes further enhance the pedestrian experience in the internal street grid as well as motorist convenience.

Certain  residential  parking  ramp  locations  have  been  modified  to  better  coordinate  with  surrounding retail storefronts and merchandising and improve the walkability of the Project site street grid./g4 Internal Circulation
The modification request includes certain changes to internal vehicular circulation. For example, Street 1 (crossing beneath Blocks 2 and 4) has been converted to a pedestrian‐only paseo in Block 4 that connects the retail environments between Wolfe Road and the Project site.  Street 1 has been removed from Block 2 to provide a better pedestrian retail experience along Streets B and C.7  Additionally, residential porte cocheres have been incorporated into Blocks 3, 4, 5, 9 and 10 to provide covered entrances for additional loading and pick‐up and drop‐off access for residents.

Mobility Services and Features
Additionally, a new rideshare hub has been introduced at the center of the below grade parking structure on the west side, which provides convenient access to the West Plaza located above. The rideshare hub includes areas for transportation network company pickup/dropoff areas, valet, concierge and parking services,  security,  and  restrooms,  including  accommodations  for  shuttles  and  ADA  vans  and  parking spaces for car share vehicles. The parking garage entrances have been directly aligned with the rideshare hub to provide direct vehicular access, and allow Project visitors to easily access the West Plaza using newly located escalators and elevators. The 15 car‐share parking spaces under the Block 1 mezzanine have been relocated to the rideshare hub. Direct pedestrian access is provided from the rideshare hub to the pavilions at the West Plaza, providing efficient and intuitive wayfinding for pedestrians. The rideshare hub was designed in collaboration with transportation networking companies and parking industry experts to optimize traffic and pedestrian flow and circulation.

2.4.3.2 Transportation Demand Management
The  Project  will  continue  to  incorporate  and  implement  various  Transportation  Demand  Management (TDM) measures that will result in reduced single occupancy vehicle trips, consistent with City policies favoring  alternative  mode  use  and  alternate  transit  solutions.   The  following  TDM  infrastructure  and operational measures remain incorporated in the modification request and will result in significant vehicle trip reductions:
● Parking supply limits

7 City Staff has reviewed these changes to Street 1 during review of the draft Final Map and has confirmed that they are in substantial conformance with the SB 35 Approval.  Nonetheless, this modification request includes these changes so that the plan set and updated Tentative Map are complete.

Appendix II, Modification Request Project Description   The Rise 14 ● Unbundled residential parking
● High quality transit stop on Stevens Creek (which also will serve as a mobility hub, in that the facility will include bike storage and repair along with transit service) ● Transit stops on Wolfe Road (one of which will also serve as a mobility hub) ● Rideshare/Transportation Network Company Hub
● Bike hubs (bicycle storage and repair facilities) distributed throughout the Project ● Class IV bike lanes on Wolfe Road and Stevens Creek
● A grid network of pedestrian connectivity throughout the Project for shortest walking paths ● Pick‐up and drop‐off areas for private shuttle buses on the east and west side of the Project ● Showers and lockers for office users
● Potential space for a day care facility for children
● Valet service to reduce on‐site travel
● Carpool parking spaces
● EV parking spaces
● Infrastructure for priced retail and workplace parking ● BMR units (which have reduced VMT)

Through marketing and tenant agreements, among other means, the Project will also promote various TDM measures, such as work‐from‐home, car‐pooling, bicycling, walking between office spaces, residential units, and restaurants and shops, the use of VTA transit, and the use of private shuttles.

Additional details regarding operational TDM components may change over time depending, in part, on new transit services and emerging technologies, as new commuter patterns and preferences arise, and based on tenant needs and market conditions at the time of implementation.

In addition to mitigating the potential traffic impacts of the Project and removing vehicle trips from the City’s roadway network, these TDM measures include certain improvements identified on the City’s TIF improvement plan in addition to improvements that are a similar type and provide the same benefits as those included in the TIF improvement plan.  Furthermore, as modified the Project also dedicates significant land to the City for implementation of traffic improvements, such as frontage roads, bikeways, sidewalks, and turn lanes.

2.4.3.3 Vehicle and Bicycle Parking
Because  the  Project  site  is  located  within  one‐half  mile  of  public  transit,  parking  standards  are  not applicable  to  the  Project,  including  this  modification  request.  (See  §65913.4(e)(1).)  Nonetheless,  the Project continues to provide parking to adequately meet the demands of the various uses, as described below for informational purposes.

The modification request includes changes to vehicle parking counts and locations as detailed in Appendix III ‐ Modification Request Plan Sets, Sheets P‐0101. Because one of the most effective TDM measures for reducing vehicular trip generation and encouraging the use of alternative modes of transportation is to reduce  parking supply, and after further analysis of the parking  allocations demonstrated that surplus below‐grade parking was available for office and retail uses under the parking ratio included in the SB 35 Approval, the Project’s total parking area has been reduced to include 7,583 vehicle stalls. The parking count is inclusive only of striped stalls and does not include additional parking accommodation that may be provided through parking management strategies, including valet parking programs and mechanical stackers,  which  would  be  deployed  based  on  future  tenant  requirements.   It  is  estimated  that implementing  these  parking  demand  strategies  could  increase  the  parking  capacity  by  at  least  30%, Appendix II, Modification Request Project Description   The Rise 15 yielding a similar effective parking supply as included under the SB 35 Approval, but avoids construction of surplus physical parking, consistent with best TDM practices.

The reduction in parking is consistent with City policies, including General Plan Strategy LU‐8.3.2, which encourages shared or reduced strategies where appropriate as incentives to construct new commercial and mixed‐use development, while increasing opportunities for other modes of transportation. Reduction in parking is further supported by a reduced office parking demand resulting from expanded work‐from‐ home policies, the opportunity for a shared parking approach between the Project’s retail and office uses and increasing utilization of rideshare services. Additionally, the Project may incorporate a significant life sciences component within the office square footage allocation given the notable recent expansion of the life  sciences  market  within  Silicon  Valley.  It  is  well  established  that  life  science  and  research  & development land uses generate lower parking demands based on a lower yield of occupied space due to research and laboratory design requirements. The associated reduction in total parking square footage also  results  in  reductions  in  construction‐related  impacts  relating  to  subterranean  grading  activity, offhaul‐ and construction‐related trips, and the extent of hard materials necessary for construction (e.g., concrete and steel).

The modification request incorporates 2,780 Class I bicycle parking spaces and 326 Class II bicycle parking spaces, an increase from the approved Project.  Additionally, the modification locates several bike hubs throughout the project, at which  cyclists can store  and repair bikes, creating  convenient and frequent facilities to encourage bicycle commuting to and from the Project.

2.4.3.4 Central Utility Plant & Accommodation of Fire Station (4 Person Facility) The modification request retains the standalone central utility plant included within the Project located at Block 3A, which provides utility services to the Project site. Based on further design progression and coordination with utility providers, the central utility plant has been developed to include the equipment required to provide primary incoming power, heating and cooling, recycled water with treatment, tier‐ four  life  safety  generators,  and  a  cooling  tower  condenser  water  loop  to  serve  all  buildings  on  the property.  The  above  grade  area  of  the  central  utility  plant  has  decreased  from  16,000  square  feet  to 12,000  square  feet.  The  use  of  a  condensed  water  loop  throughout  the  Project  site  will  provide  an environmentally  sustainable  heating  and  cooling  sink  that  takes  energy  from  one  use  and  uses  it  in another.

Under the SB 35 Approval, the approved plan sets included an approximately 7,000 square foot area for an optional fire station accommodating four SCCFD staff in the northwest of the Project site. Under the modification request, the central utility plant continues to include demised space for an approximately 7,000‐square foot fire station (4‐person) to accommodate two vehicle apparatus bays (one apparatus bay accommodating an approximately 168” wheelbase fire truck and one accommodating a Captains Vehicle), which has been reviewed with Santa Clara County Fire Department (“SCCFD”), as a possible future tenant fit‐out. While a fire station is not required by the Project approvals or any other applicable regulatory requirement, the Applicant intends to continue to provide this new fire station, as designed, which will be a community benefit for the Project and the surrounding community. The City has estimated the value of this benefit to be $10,000,000.

2.4.3.5 Mechanical, Electrical and Plumbing Configurations Under  the  SB  35  Approval,  the  majority  of  mechanical,  electrical  and  plumbing  (MEP)  equipment  was located in various below‐grade areas.   Based on further design progression and as a result of advanced coordination with PG&E, this equipment has now been relocated to ground‐floor levels.  This relocation Appendix II, Modification Request Project Description   The Rise 16 has  allowed  for  the  reduction  in  the  below‐grade  garage  perimeters  by  eliminating  the  MEP  space reserved for below‐grade transformers and other MEP equipment has now been placed at grade within the buildings.   This relocation remains in compliance with PG&E Electric and Gas Service Requirements (Greenbook).

Under the modification request, the distribution of cisterns for water capture, retention, and reuse have also been relocated to below the garage parking slabs following the natural slope of the site. Through consultation  with  the  various  City,  County,  and  State  agencies,  certain  infrastructure  utility  points  of connection,  sizes,  and  distribution  have  been  refined  according  to  meet  these  agencies’  respective requirements, including relocations of above‐grade components that will be screened to meet Cupertino standards.

2.4.3.6 Construction Phasing
Development  of  the  Project  is  expected  to  occur  in  multiple  phases  over  several  years,  depending  on market absorption rates, with both sequenced starts and concurrent openings.  The construction phasing plan remains conceptual until such time as building permits are issued, and actual phases may vary as to scope or sequence at that time.

In response to community feedback, Applicant has prioritized the delivery of the Project’s much‐needed housing, as well as the majority of the retail and a significant portion of the at‐grade open space in the first  phase  of  construction,  as  well  as  the  complete  road  network  and  supporting  infrastructure.   In particular, the first construction phase is anticipated to include the central utility plant, the below‐grade parking structure podium on the west side, and construction of Blocks 1, 2, 4, and the West Plaza. The second construction phase is anticipated to include the remaining west side buildings on Blocks 3, 5, and

6.  The final third construction phase is anticipated to include the entirety of the east side, inclusive of the two levels of podium, Blocks 7, 8, 9, 10, and 11. (Note that, compared to the original phasing plan, this phasing plan contains a greater percentage of affordable housing and greater amount of retail delivered in the first phase, the same amount of office delivered in the first phase, and a lower amount of office delivered in the first two phases).

Consistent  with  the  building  permit  applications  on  file  with  the  City,  it  is  anticipated  that  the subterranean  garage  structures/podia  will  be  developed,  and  they  will  then  support  no  less  than  the construction of superstructures above the ground plane.  Again, this conceptual phasing plan is subject to further refinement (which could include the modification or swapping of any phase), and the completion of any individual building will depend upon a number of factors, including construction logistics, relocation of  any  remaining  existing  tenants,  availability  of  contractors,  and  other  market  conditions  and  will continue to be implemented with the Conditions of Approval, such that the last certificate of occupancy for  non‐residential  construction  shall  not  be  issued  until  two‐thirds  residential  square  footage  is constructed.
3 Summary of Modification Request Entitlement Amendments In  connection  with  the  SB  35  Approval,  the  City  issued  the  following  specific  entitlements:
(1) Development Permit – Major; (2) Architectural and Site Approval – Major; (3) Tentative Subdivision Map for Condominium Purposes (Tentative Map); and (4) Tree Removal Permit. Applicant anticipates that this modification request will require amendments to each of these permits.

Appendix II, Modification Request Project Description   The Rise 17 3.1 Planning Permit Amendments
Specifically,  Applicant  anticipates  that  the  Development  Permit  –  Major  and  Architectural  and  Site Approval – Major will be amended to reflect the design revisions described above and as reflected in the Appendix III, Modification Request Plan Sets. The Tree Removal Permit amendment will be required to account for removal of twelve (12) additional on‐site tree removals consistent with Condition 30, which states that a Tree Removal Permit is required for removal of additional on‐site protected trees. These additional tree removals are required due to location of Project driveways and loading areas along Wolfe Road; these additional trees include #63, 65, 66, 67, 277, 284, 440, 441, 442, 466, 467, and 1245 as shown in the tree disposition plan in Appendix III, Modification Request Plan Sets, Sheets P‐0101 and P‐0602B and as described in the Appendix VIII, Updated Arborist Report.   In total, the Project will include 1,271 trees inclusive of new, relocated and retained trees; the total number of trees on the Project site has been reduced compared to the SB 35 Approval but tree replacements on the Project site will continue to exceed City replacement requirements.  No additional amendments to the Tree Removal Permit are anticipated.

Additional details regarding the Tentative Map amendments are described in Section 3.2 below.

Because  the  modification  request  is  being  submitted  pursuant  to  SB  35,  the  City’s  normal  permitting process and any findings or other requirements are not applicable to the extent that such requirements go  beyond  confirming  SB  35  compliance  and  whether  the  modification  affects  the  City’s  prior determination  of  the  Project’s  consistency  with  objective  standards.   SB  35  prohibits  the  City  from requiring discretionary approvals for the modification request, consistent with the original SB 35 Approval process.

3.2 Tentative Map Amendments
The Tentative Map amendment is proposed primarily to remove a Public Access Easement that had been included  originally  on  the  areas  proposed  for  public  parks  and  open  space,  including  the  plazas,  the bike/ped path and access to the green roof.  However, because the City has elected not to recognize these areas  as  public  park  dedications  for  purposes  of  providing  Park  Fee  credit,  the  dedications  are  being removed.  In addition, we are proposing to modify the area dedicated to the City at the corner of Wolfe Road and Stevens Creek Boulevard to align with other project changes. There are also other minor changes that through the Final Map processing, the City has confirmed are in substantial conformance with the original  Tentative  map.   Although  these  minor  changes  have  been  determined  to  be  in  substantial conformance, the Tentative Map is being updated to reflect them as well.

Table 2 below describes all the changes.  Overall, the core components of the Tentative Map remain as approved  under  the  SB  35  Approval,  including:  the  proposed  configuration  of  Parcel  A  and  Parcel  B; allowance for up to 2,500 condominium units (not to exceed 2,402 residential and 98 commercial/retail condominium  units);  and  the  option  to  utilize  phased  final  maps  pursuant  to  Section  66456.1  of  the Government Code.

None of the proposed changes to the Tentative Map relate to an objective standard applicable to the Property.

Appendix II, Modification Request Project Description   The Rise 18 Table 2:  Tentative Map Revisions per Modification Request Map
Component/Features  Additional Details
No Modification Proposed
Parcel Number  No  change  proposed.   Tentative  Map  revision  retains  proposed  Parcel  A  and  Parcel  B configuration on either side of Wolfe Road.

Condominium
Purpose
No change proposed. Tentative Map revision retains proposed allowance for up to 2,500 condominium  units  (not  to  exceed  2,402  residential  and  98  commercial/retail condominium units).

Phased Final Mapping   No change proposed. Tentative Map revision retains option to utilize phased final maps pursuant to Section 66456.1 of the Government Code.

Easement Relocation  No  change  proposed.  Tentative  Map  revision  maintains  all  easements  proposed  for relocation by the approved Tentative Map pursuant to Section 66434(g) of the Government Code remain as previously shown.

Modification Proposed
Dedications   Modification  proposed.  Tentative  Map  revision  continues  to  provide  dedications  of  the Vallco property along the Project frontages, but the specific dedication alignments have been updated based on direction from the City Engineer and the City’s surveyor. Namely, the property lines after dedication along Wolfe Road and Stevens Creek Boulevard were adjusted to comply with requests from Public Works: (1) On Stevens Creek Boulevard, the dedication area was revised to ensure that the Property line is parallel to the centerline of the right of way; and (2) on Wolfe Road, the dedication area was revised to follow the line of the five foot public sidewalk.  In addition, the property lines after dedication at the corner of Wolfe Road and Stevens Creek Boulevard were adjusted to align with the modification request  site  plan,  resulting  in  dedication  of  a  five‐foot  public  sidewalk  in  that  location.

Lastly,  easement  rights  have  been  reserved  along  the  dedicated  areas  on  Wolfe  Road adjacent  to  the  pedestrian  bridge  to  accommodate  air  rights,  supports,  footings  and columns associated with the bridge.

Public Utility
Easements (PUE)
Modification proposed. Tentative Map generally maintains all public utility easements for maintenance and operation of public utilities across the Project site; one minor change has been included to relocate a portion of the 10‐foot PUE to the other side of Perimeter Road.

Emergency Vehicle
Access Easements
(EVAE)
Modification proposed. Tentative Map revision continues to provide EVAEs on all vehicular streets  throughout  the  Project  site;  however,  based  on  the  updated  design,  a  vehicular street has been removed from Blocks 2 and 4 so the corresponding EVAE has been removed from that location.

Public Access
Easements (PAE)
Modification proposed. The original Tentative Map included public access easements over the plazas, bike/ped facilities through the Project and onto the green roof.   The intent of these  public  parks  was  to  satisfy  the  City's  Parkland  Ordinance.   However,  and notwithstanding General Plan policies favoring dedications over fees, the City has elected not to treat these areas as parks and to instead charge a fee. Therefore, the Tentative Map revision removes PAEs on plaza areas, as well from certain bicycle pathways and the access point to the green roof.  If the City determines that credit should be given for the PAEs, the Applicant would be willing to maintain the PAEs.

Appendix II, Modification Request Project Description   The Rise 19 4 Residential Affordability and Density Bonus
As described in the SB 35 Application and the SB 35 Approval, the Project qualified for and was granted a density bonus under the State Density Bonus Law (as implemented by the Cupertino Municipal Code).

Under the SB 35 Approval, the City granted a density bonus of 35 percent, yielding 623 additional market rate density bonus units, and granted three concessions as described below.

The modification request remains eligible for the 35% bonus and three concessions as approved. Under the applicable General Plan Land Use Element policies, the “base density” for the Project site remains 1,779 units. Under the modification request, the Project will continue to provide 50% of the units (i.e., 1,201 units) affordable to at least 80% AMI households; these 1,201 units exceed the number of affordable units required by SB 35, as has been clarified by HCD. The requirement to provide 50% affordable units is calculated excluding any market rate density bonus units, which yields a total Project requirement of 890 affordable units.  (See HCD Guidelines § 402(b)(3).)  Therefore, by including 1,201, the Project is voluntarily providing an additional 311 affordable units as a community benefit above the required 890 affordable units.   Consistent  with  the  SB  35  Approval,  the  Project’s  density  bonus  units  remain  geographically separate, as allowed under the state Density Bonus Law. Also, although the Project now qualifies for a 50% density bonus due to changes in state law, because of the advanced stage of design and the relatively significant changes to building heights and land use distribution that would be necessary to accommodate the additional units, the Project continues to propose a 35% bonus resulting in the same number of total units.

The modification request includes a reduction of the Very Low Income units to 267, which represents 15% of the base density of 1,779 units.  The State Density Bonus Law allows three concessions for projects with 15% of the "total units," where that term is defined to exclude units added by the density bonus, available for very low‐income households.   As a result, the Project continues to qualify for three concessions, as further described in Section 4.1 below.

See  Table  3  below  for  a  comparative  summary  of  the  density  bonus  calculation  under  the  SB  35 Application and this modification request.

Table 3:  Density Bonus Summary Table
Maximum
Units
Permitted
Excluding
Bonus
Maximum
Units
Permitted
with Bonus
Affordable
Units by
Income Level
Bonus
Percentage
Incentives/
Concessions
Bonus
Units
Total Units
Proposed
Original
SB 35
Approval
1,779  2,402  Very Low: 361
Low: 840  35%  3  623  2,402
Modification
Request  1,779  2,669  Very Low: 267
Low: 934  35%  3  623  2,402

Appendix II, Modification Request Project Description   The Rise 20 4.1 Density Bonus Incentives/Concessions
In  addition  to  increasing  the  Project’s  density,  the  Project  qualified  for  3  concessions  under  the  State Density Bonus Law based on the inclusion of 15% of the total units for very low‐income households. As further  described  in  the  SB  35  Approval,  the  City  granted  the  following  concessions  under  the  State Density Bonus Law:

1. A concession to allow the affordable units to be studios and one‐bedroom units instead of a mix of units comparable to the units within the development pursuant to BMR Housing Mitigation Procedure Manual Section 2.3.4 (A);8

2. A concession to allow the affordable units to be smaller in size than the market rate units pursuant to BMR Housing Mitigation Procedure Manual Section 2.3.4(B); and

3. A concession to allow 400,000 square feet of retail, a reduction of 200,000 square feet, where 600,000 square feet is required in the General Plan pursuant to Strategy LU‐19.1.4.

The Project, as modified, would continue to include these three concessions.   Under SB 35, additional density or other concessions, incentives, or waivers of development standards granted pursuant to the Density  Bonus  Law  are  not  taken  into  account  when  evaluating  compliance  with  the  City’s  “objective zoning standards” and “objective design review standards.”  Despite recent case law that brings clarity to and would facilitate the use of waivers in the Project, no Density Bonus waivers are currently proposed.

Under the State Density Bonus law, the City can only deny an incentive or concession if it finds that an incentive or concession does not result in identifiable and actual cost reductions; would have a specific, adverse impact on public health and safety or the physical environment; or would violate state or federal law.  The City has already granted these concessions, and they remain applicable, so that determination cannot be revisited. As required by the State Density Bonus Law, the obligation to maintain these units as affordable units will be recorded in an agreement between Applicant and the City.

8 Although the modification request adds two‐ and three‐bedroom units, as requested by the City, the proportion of affordable and market unit types is not the same so this concession remains applicable.

Appendix II, Modification Request Project Description   The Rise 21 Attachment  A  –  Two‐Thirds  Residential  Compliance  –  Updated  HCD Guidelines Methodology (Informational Purposes Only)
This Attachment A provides information regarding the original SB 35 Approval and modification request square footage measurements based on the Updated HCD Guidelines methodology, which is utilized in the City’s SB 35 Eligibility Checklist and related SB 35 Application Form.  This is provided for informational purposes and the City must use the “floor area” definition because that was the “analytical methodology” utilized in the SB 35 Approval.  As shown in Table 4 below, the modification request remains in compliance with the two‐thirds residential requirement when utilizing the Updated HCD Guidelines methodology, as well as the floor area approach (see above Project Description, Section 2.2, Table 1).

The key ways in which the Updated HCD Guidelines Methodology differs from the “floor area” definition are that areas that service both residential and non‐residential are apportioned and residential balconies are included. (The City's practice is to not count non‐residential balconies as building area, and so we have adopted that approach here.  However, if we were to include nonresidential balconies in the calculation, the Project would still comply with the 2/3s test.) Because the HCD Guidelines Methodology focuses on types  of  uses  and  not  on  measurement  methodologies,  this  approach  continues  to  use  some  City conventions, such as excluding attics, counting stairwells/elevators only at the base, and double counting areas with extra high ceilings (15 or 20 feet, depending on the floor).  As it relates to the modification of the  2018  approval,  the  current  design  reflects  a  COVID‐driven  increase  in  private  open  space,  such  as yards and terraces.

Table 4:  Two‐Thirds Residential Compliance – Updated HCD Guidelines Methodology1 2018 SB 35 Approval (Recalculated
Utilizing HCD Methodology  Modification Request
Land Use  Amount  % Project  Amount  % Project
Residential Dwelling Units  2,402 units  N/A  2,402 units  N/A Residential Uses (sq. ft.)  5,410,304 sq. ft.  68.7%  5,656,995 sq. ft.  69.7% Office (sq. ft.)  1,981,447 sq. ft.  25.2%  1,985,600 sq. ft.  24.4% Retail / Entertainment (sq. ft.)  485,912 sq. ft.  6.2%  475,122 sq. ft.  5.9% Total Square footage  7,877,663 sq. ft.  100 %  8,117,717 sq. ft.  100% Percent Change4  N/A
Unit Count: 0% change
Square footage:  3.05%
Notes:

1. Information in this Table 4 is provided for informational purposes only; the floor area methodology described in Section 2.2, Table 1 of the Project Description remains the applicable methodology for purposes of determining two‐thirds residential compliance required under SB 35 and determining the percent‐change of the modification request compared to the SB 35 Approval.